( Reaflirmrd 1995 )
Indian Standard
FOR ANALYSIS OF
RATE OF SHUTTERING/FORMWORK
PRO FORMA
UNIT
FOR CONCRETE
Cost Analysis
ITEMS
Sectional
Committee,
HDC 63
Chairman
SKRI S. N. AGNIHOTRI
7 10, Sector
1 I-B,
Chandigarh
Representing
Members
SRRI J. .P. AWASTHY
DIRECTOR CENTRAL
DESIGNS ( Alternate )
CHIEF
ENQINEER
( MEDIUM Irrigation
& Power Department,
Government
of
IRRIGATION & DESIGNS )
Andhra Pradesh, Byderabad-,
.
.
SUPERINTENI~NG ENQINEER ( Alternate )
Government of Maharashtra,
CHIEF
ENGINEER
( SPECIFIEU Irrigation Department,
PROJECT )
-P une
_
CHIEF ENQINEER ( WORKS
J
Beas Sutlai Link Proicct,
Sundernaear
_
SU~ERINTEND;NG EN(:I&YTL ( Alternate )
DIRF,CT?R ( CMC )
Central Water Commission, New Delhi
DEPUTY DIRECTOR ( CMC ) ( Alternate )
DIRIXTOR ( R & C )
Central \Vater Commission, New Delhi
DV:PTWYDIRIWTOR ( R & C ) ( Alternate )
SHRT J. DUXAIRAJ
In personal capacity ( D-Z/141, Satya Marg,
New
Zklhi 110021 )
EXIZCUTIVE EI-?GINEER ( CIVIL )
Kerala State Electricity Board, Trivandrum
GENERAL M A~CAGER
S. B. Joshi 81 Co Ltd, Bombay
Roads Wing ( Ministry of Shipping
& Transport ),
SHRI R. M. GUPTA
New Delhi
SHRI M. L. M.~NDAL ( Alternate)
M. N. Dastur & Co ( P ) Ltd, Calcutta
SHRI S. S. IYENCaR
SHRI N. G. TOSHI
Karnataka Power Coruoration Ltd. Bangalore
SHRI A. S. ~ISHNASWAMY
Directorate General Bbrder Roads,Newbelhi
SRRI H. B. U~ASI ( Alternate )
SHRI T. S. MURTHY
National Project
Construction
Corporation
Ltd,
New Delhi
SHRI P. D. DUBHASHI ( Alternate )
( Continued on page 2 )
@ Copyrighf 1983
BUREAU
OF INDIAN
STANDARDS
This publication
is protected
under the Indian Copyri@
Act ( XIV
of 1957 ) and
reproduction
in whole or in part by any means except with written permission of the
publisher shall be deemed to be an infringement
of copyright under the said Act.
IS : 10421- 1983
Repesentin.~
hlembers
Hindustan
Construction
Corporation
.I. N,AC..\IIJII:SIIAN.+
KAU
SJXRI D. M. S.\vux
( Allernnle )
Pate1 Engineering
Co Ltd, Uombay
SJJRI Y. G. PATI%
Hinduztan
Steel Works Construction
SJrl<I i. A. 1<.,0
Institution
of Engineers,
Pathankot
SIIIlJ :\. s. SPXNclN
Construction
Consultation
Services,
SI~I~I G. D. l.\s~.\it
Sunr
SHRI
D.
A. I<oTJ~.\RI
( Mernnle
Indian Institute
Director
General,
SJsIlI hf.'I'l3YAGAlMJAiV
R \MAN,
Director
( Civ Engg
SHRI
G.
Ltd,
Bombay
Ltd,
Cakutta
Bombay
ofPublic &ministration,
New Delhi
)
Secretary
SICRI
Assistant
HEMANT
Director
KGMAR
( Civ Engg ), IS1
IS : 10421- 1983
Indian Standard
PRO FORMA FOR ANALYSIS OF
UNIT RATE OF SHUTTERINGlFORMWORK
FOR CONCRETE ITEMS
0.
FOREWORD
valley
projects
are
forms,
b) Built-in-place
forms,
c) Mobile
forms, and
d) Special
forms.
of project,
b) Name
of work,
c) Layout
d) Location
e) Purpose
plan of project,
of work,
of work,
f) Longitudinal
and cross-section,
g) Construction
agency,
1) Departmental
or contract
3
IS : 10421- 1983
2) Name
of department/contractor
h) VoIume
of concrete
j) Approximate
k) Average
m) Type.of
work,
n) Normal
size of shuttering
p) Detailed
dimension
sketches
of special
shapes.
NOTP: - Detailed plan, elevation and sections of the work and full dimension
sketches of the formworks for the whole work as well .as for individual units should
be provided.
1. SCOPE
rate
of
2. PRO. FORMA
2.1 The pro forma recommended
for analysis of unit
formwork for concrete items is as given in Table 1.
TABLE
CR0
FOR ANALYSIS
:SHUTTERING/F~RMWORK
FORMA
OF UNlT
rate
of shuttering/
RATE
OF
Details of Shuttering:
i) Name of work fqr which shuttering is required
ii) Q.uantity of concrete
iii) Type and shape of shuttering
( Continued )
values ( revised ),
IS :10421-1983
TABLE
(A) STEEL
PRO FORM/i
FOR ANALYSIS
SHUTTERING/FORMWORK
OF UNIT
- Contd
Item
Unit
Quantity
Rate
(1)
(2)
(3)
(4)
RATE
Amount
(5)
OF
Remarks
(6)
SHKTERING
a) Materials
i) Steel plates
ii) Steel sections
iii)
Pipes
iv) Miscellaneous
materials
including that required for
welding, rivetting, etc
b) Labour charges for fabrication
i) Foremen/supervisors
ii) Welders
iii)
Fitters
iv) Helpers
v) Skilled/ordinary
labour
vi) Others
C)
machine
ii) Welding/rivetting
iii) Rolling
machine
machine
supply
supply
( Continued )
X5:10421-
1983
TABLE
PRO FORMA
FOR ANALYSIS
SHUTTERING/FORMWORK
Unit
Item
(1)
.
v) Sanitary
(2)
viii)
Amount
(4)
(5)
Remarks
(6)
facilities
Medical
Other
(3)
Rate
OF
facilities
vi) Drainage
vii)
Quantity
OF UNITRATE
- Conk
facilities
amenities
f ) Maintenance cost of
items under clause (c)
g) Proportional cost of su@G3rwork establishmezt
h) Coaliagcacies
j) Ooerhead ( exctuding projt )
Total
cost of shuttering
Area
of shuttering
Numher
of reuse
Cost of shuttering/unit/use
L) Erection cost
i) Transportation
ii) Labour
iii)
charges
charges
with
Materials
including
sealing, etc
details
oiling,
iv) Scaffoldings
v) Machinery
charges,
m) Dismanding/stri&&
cost
i) Transportation
ii) Lahour
iii)
Machinery
if any
charges
charges
with details
charges,
if aiy
n) -Total charges ( a to m ) of
formwork/sq.m chargeable to work
*This sh+l include establishment,
office stationery,
general tools and plantc
.cars, their runnmg
and maintenance,
insurance,
workmans
compensation
phone and telecommunication
facilities,
consultation
services, entertainme&,
staff
tele_
etc
( Continued 1
IS:10421-1983
TABLE
PRO FORMA
FOR ANALYSIS
SHUTTERING/FORMWORK
Item
Unit
Quantity
Rate
(2)
(3)
(4)
(1)
(B) WOODEN
OF UNIT
- Contd
RATE
Amount
(5)
OF
Remarks
(6)
SHUTTERINGY
a) Materials
i) Type
of timber
material
b) Labour charges
i) Foremen/supervisors
ii) Carpenters
iii) Labour for creating
position
in
iv) Helpers
v) Other labour,
if any.
saw
ii) Planer
iii) Shaper
iv) Others.
iii) Electric
supply
facilities
facilities
facilities
Other amenities
( Continued
TABLE
FRO FORMA
FOR ANALYSIS
SHUTTERING/FORMWORK
OF UNI?
- Co&d
Item
Unit
Quantity
Rate
(I)
(4
(3)
(4)
RATE
Amount
(5)
OF
Replark
(6)
f ) FYoportional cost of
g) Conlingencies
lh) Overhends ( ex&iing
Total
pro& ) *
cost of shuttering
Area of shuttering
Number
of reuse
Cost of shuttering/unit/use
j) Erestion cwt
i) Transportation
charges
Materials including
sealing, etc
oiling
iv) Scaffoldings
v) Machinery
charges,
if any
k) Disnlanllinglstrip~i~g cost
i)
ii)
Transportation
Labour
charges
iii) Machinery
charges, if any
m) Totar chqes
of ( a to k ) formwwklsq, nt chargeable to work
*Overhead shal1 include establishment, office stationery, general tools and plants,
staff cars, their running and maintenance,
insurance, workmans compensation,
telephone and telecommunication
facili,ties, consultation service, entertainments,
etc.
BUREAU
OF INDIAN STANDARDS
Headquarters:
Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002
Telephones: 323 0131, 323 8375,323
9402
Fax : 91 11 3234062,91
11 3239399
Telegrams : Manaksanstha
(Common to all Offices)
Telephone
Central Laboratory
: Manak
*Eastern
: l/14
201010
0-77 00 32
: C.I.T.
Southern
tWestern : Manakafaya.
MUMBAI 400093
Branch
Offices:
323 76 17
700054
337 86 62
160022
60 30 43
600113
235 23 15
Exchange,
Andheri
(East),
832 92 95
Offices::
Pushpak, Nurmohamed
839 49 55
1171418 B, Sarvodaya
Seth
Bhawan,
2nd
LUCKNOW 226001
641037
21 0141
8-28 88 01
201001
8-71 1996
781003
54 11 37
500001
20 10 83
JAIPUR 302001
Nagar, KANPUR
Floor,
40 36 27
121001
554021
751001
E-52, Chitaranjan
550 13 40
5-8-56C,
380001
Road,
37 29 25
208005
Behind
Leela
21 68 76
Cinema,
Naval
Kishore
Road,
Offices
26 23 05
West
23 09 23
695034
621
17
:
High Court Road,
Shankar
Nagar
Square,
52 51 71
32 36 35
271085
tSales
Square,
Printed at Printograph,
309 65 28
222 39 71