Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
FTE.FTO
UNIDAD EJEC.
PROYECTO
SUB: PROYECTO
CDIGO
ESPECIFICA DE GASTOS
C.DIRECTO
2.6.2.3.5.3
PERSONAL
189,776.82
2.6.2.3.5.4
BIENES
465,459.37
2.6.2.3.5.5
SERVICIOS
2.6.2.3.5.6
OTROS
0.00
31,195.00
TOTAL COSTO DIRECTO
686,431.19
S/.
CARGO
OPERARIO
OFICIAL
PEON
TOPOGRAFO
UNIDAD
hh
hh
hh
hh
P.U.
10,918.6771
4,895.9865
14,508.7624
66.5259
CANTIDAD
7.36
5.89
5.52
7.36
TOTAL
2.6.2.3.5.4 BIENES
MATERIALES DE CONSTRUCCION
DESCRIPCION
ACEITE PARA MOTOR SAE-30
ACCESORIOS DE CONEXION PARA REFLECTOR
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
REJILLA METALICA DE 0.25M INST. Y PINTADO
CLAVOS PARA MADERA CON CABEZA DE 1 1/2"
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA MADERA CON CABEZA DE 4"
CLAVOS PARA CEMENTO DE ACERO NEGRO DE 2"
PERNOS 1/2" X 2" CON HUACHA Y TUERCA
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ARENA FINA
TIERRA DE CHACRA O VEGETAL
GRASS
PIEDRA CHANCADA DE 3/4"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA DE 6"
PIEDRA CHANCADA DE 1/2"
PIEDRA MEDIANA DE 4"
ARENA GRUESA
CABLE TW # 14 AWG 2.5 mm2
CABLE DE COBRE DESNUDO DURO 35 mm2
CABLE TW 4 mm2
CABLE DE COBRE DESNUDO 35 mm2
CABLE DE COBRE DESNUDO 10 mm2
CABLE THW 10 mm2
JACK RJ45
CABLE ELECTRICO TW AWG N14
CABLE ELECTRICO TW AWG N12
CABLE ELECTRICO THW N10
LAVATORIO DE ACERO INOXIDABLE INCLUYE ACCESORIOS
INODORO TANQUE BAJO INCLUYE ACCESORIOS
LAVATORIO DE PARED INCLUYE ACCESORIOS
UNIDAD
gal
glb
kg
kg
m
kg
kg
kg
kg
und
pza
kg
m3
m3
kg
m3
m3
m3
m3
m3
m3
m
m
m
m
m
m
pza
m
m
m
und
und
und
CANTIDAD
0.0129
4.0000
320.6435
470.9633
55.1250
2.2522
1.1411
399.8438
346.3541
282.8000
24.9000
12,227.5891
44.8207
52.7975
48.9500
202.5845
233.2496
89.6017
19.2562
45.0000
178.3674
474.8000
65.0000
608.0000
7.5400
11.9500
1,248.0000
1.0000
752.2410
1,429.7010
112.0350
1.0000
5.0000
6.0000
P.U
20.00
150.00
4.50
4.50
25.00
4.50
4.50
4.50
4.50
0.20
2.00
3.50
130.00
25.00
30.00
110.00
50.00
50.00
110.00
75.00
110.00
2.00
5.00
8.00
3.50
2.50
2.50
200.00
1.20
1.40
2.40
140.00
145.00
90.00
189,776.82
SUB TOTAL
80,361.46
28,837.36
80,088.37
489.63
189,776.82
S/.
465,459.37
S/.
456,553.11
TOTAL
0.26
600.00
1,442.90
2,119.33
1,378.13
10.13
5.13
1,799.30
1,558.59
56.56
49.80
42,796.56
5,826.69
1,319.94
1,468.50
22,284.30
11,662.48
4,480.09
2,118.18
3,375.00
19,620.41
949.60
325.00
4,864.00
26.39
29.88
3,120.00
200.00
902.69
2,001.58
268.88
140.00
725.00
540.00
SUB: PROYECTO
und
1.0000
350.00
350.00
und
und
3.0000
5.0000
90.00
50.00
270.00
250.00
pza
pza
und
pza
und
und
und
und
und
pza
und
pza
und
und
und
und
und
und
pza
und
und
und
und
gal
gal
und
und
und
hm
und
m
glb
m
pza
m
m
m
bls
m2
4.0000
1.0000
51.0000
43.0000
2.0000
1.0000
1.0000
1.0000
4.0000
12.0000
2.0000
1.0000
113.0000
32.0000
3.0000
2.0000
1.0000
2.0000
41.0000
18.0000
4.0000
10.0000
4.0000
86.9344
25.4260
4,513.3400
4,199.0400
36.0000
20.0000
286.2500
80.0000
1.0000
15.0000
1.0000
410.0000
286.2300
130.2420
4,691.5547
17.6925
180.00
220.00
12.00
9.00
40.00
120.00
60.00
40.00
35.00
9.00
15.00
12.00
8.00
8.00
5.00
7.00
8.00
200.00
6.00
30.00
150.00
32.00
25.00
25.00
30.00
1.70
2.10
8.00
10.00
1.60
18.00
800.00
2.00
250.00
1.50
20.00
5.20
23.10
30.00
720.00
220.00
612.00
387.00
80.00
120.00
60.00
40.00
140.00
108.00
30.00
12.00
904.00
256.00
15.00
14.00
8.00
400.00
246.00
540.00
600.00
320.00
100.00
2,173.36
762.78
7,672.68
8,817.98
288.00
200.00
458.00
1,440.00
800.00
30.00
250.00
615.00
5,724.60
677.26
108,374.91
530.78
und
par
und
bls
rll
rll
bls
kg
kg
kg
und
und
und
und
und
und
und
und
und
13.0000
39.0000
1.0000
83.6520
16.4629
177.6120
288.8771
21.1577
81.8562
7.2000
68.8380
2.0000
2.0000
12.0000
1.0000
1.0000
12.0000
1.0000
4.0000
60.00
6.00
3,500.00
4.40
3.50
2.00
6.00
13.00
5.00
13.00
0.10
25.00
50.00
55.00
400.00
652.20
9.00
220.00
980.00
780.00
234.00
3,500.00
368.07
57.62
355.22
1,733.26
275.05
409.28
93.60
6.88
50.00
100.00
660.00
400.00
652.20
108.00
220.00
3,920.00
SUB: PROYECTO
gal
cart
bls
gal
m3
gal
und
m3
und
glb
m2
m
m2
p2
m
1.7339
80.9450
30.0435
103.2234
216.7556
3.6036
33.0330
288.5900
2.0000
1.0000
130.0980
66.7800
266.9730
1,174.1730
74.2350
100.00
9.00
18.00
13.00
100.00
50.00
1.50
1.00
100.00
37,853.42
30.00
12.60
50.00
4.50
10.00
173.39
728.51
540.78
1,341.90
21,675.56
180.18
49.55
288.59
200.00
37,853.42
3,902.94
841.43
13,348.65
5,283.78
742.35
p2
p2
p2
pza
pza
m
pza
und
lb
gal
gal
gal
gal
gal
gal
pza
pza
m2
und
und
und
m
m
m
m
m
und
und
und
und
und
und
und
und
m
m
m
und
pza
m
und
33.2981
1.3206
12,390.9477
18.0000
75.6000
24.9000
1.0000
73.9200
0.2801
10.5796
76.4899
2.3250
4.6500
81.1571
5.2216
100.0340
48.4000
10.3584
1,355.2800
18.0000
18.0000
40.5000
24.6500
5.3000
317.8570
16.0000
7.0000
1.0000
48.0000
14.0000
2.0000
4.0000
1.0000
219.8900
17.5000
33.3900
95.5600
9.0000
113.1800
28.1960
186.5000
5.00
2.50
2.30
20.00
25.00
5.00
100.00
10.50
10.00
35.00
45.00
35.00
18.00
17.00
16.00
60.00
30.00
40.00
2.20
2.00
2.00
90.00
110.00
20.00
10.00
13.00
58.00
28.00
2.00
5.00
5.00
6.00
1.50
1.50
5.00
8.00
60.00
28.00
3.45
8.00
4.00
166.49
3.30
28,499.18
360.00
1,890.00
124.50
100.00
776.16
2.80
370.29
3,442.05
81.38
83.70
1,379.67
83.55
6,002.04
1,452.00
414.34
2,981.62
36.00
36.00
3,645.00
2,711.50
106.00
3,178.57
208.00
406.00
28.00
96.00
70.00
10.00
24.00
1.50
329.84
87.50
267.12
5,733.60
252.00
390.47
225.57
746.00
und
4.0000
8.00
32.00
und
96.0000
10.00
960.00
und
64.2460
18.00
1,156.43
PROYECTO
SUB: PROYECTO
und
und
und
und
81.0000
1.0000
64.0000
117.0000
1.50
2.00
2.20
1.00
121.50
2.00
140.80
117.00
p2
849.9225
2.90
2,464.78
TOTAL
456,553.11
1.00 HERRAMIENTAS
S/.
DESCRIPCION
WINCHA DE 50M
PALAS TRAMONTINA
PICOS TRAMONTINA
BUGUIES
CIZALLA
COMBOS
BARRETAS
BALDES VACIOS DE 20GL
CILINDROS
MANGUERAS
OTROS
UNIDAD
PZA
UND
UND
UND
UND
UND
UND
UND
UND
M
GLB
CANTIDAD
5.00
20.00
20.00
8.00
20.00
10.00
10.00
25.00
5.00
300.00
1.00
P.U
TOTAL
350.00
900.00
900.00
2,400.00
600.00
500.00
500.00
625.00
1,000.00
750.00
381.26
8,906.26
70.00
45.00
45.00
300.00
30.00
50.00
50.00
25.00
200.00
2.50
381.26
TOTAL
2.6.2.3.5.5 SERVICIOS
8,906.26
S/.
DESCRIPCION
UNIDAD
glb
CANTIDAD
P.U
SUB TOTAL
0.00
TOTAL
2.6.2.3.5.6 OTROS
DESCRIPCION
MIRAS Y JALONES
CAMION VOLQUETE 6 X 4 330 HP 15 m3
SOLDADORA ELECTRICA MONOFASICA ALTERNA 225 A
ANDAMIO METAL TABLAS ALQUILER
SIERRA CIRCULAR
CIZALLA ELECTRICA PARA CORTE DE FIERRO
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP
CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3
TRACTOR SOBRE ORUGA D-6
VIBRADOR DE CONCRETO 3/4" - 2"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
NIVEL TOPOGRAFICO CON TRIPODE
ESTACION TOTAL
CEPILLADORA ELECTRICA
0.00
0.00
S/.
UNIDAD
hm
hm
hm
est
hm
hm
hm
hm
hm
hm
hm
he
hm
hm
CANTIDAD
1.5121
49.9156
7.2000
565.8231
24.0240
773.4103
574.5566
16.6137
3.8728
137.6407
978.1835
89.8070
91.3167
24.0240
P.U
31,195.00
10.00
150.00
12.00
2.00
5.00
2.00
8.00
220.00
250.00
6.00
9.00
8.00
12.00
6.00
SUB TOTAL
15.12
7,487.34
86.40
1,131.65
120.12
1,546.82
4,596.45
3,655.01
968.20
825.84
8,803.65
718.46
1,095.80
144.14
TOTAL
31,195.00
S/.
686,431.19
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS
I.E. DE CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI, CCUYO,
QUISINI, TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI, DISTRITO
DE MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
ESPECIFICA DE GASTOS
G. GRALES
PERSONAL
40,500.00
BIENES
10,876.50
SERVICIOS
18,750.00
OTROS
4,710.00
TOTAL GASTOS GENERALES
74,836.50
2.6.2.3.5.3
2.6.2.3.5.4
2.6.2.3.5.5
2.6.2.3.5.6
PERSONAL
40,500.00
40,500.00
1 JORNAL
CARGO
RESIDENTE DE OBRA
ASISTENTE TECNICO
ASISTENTE ADMINISTRATIVO
MAESTRO DE OBRA
ALMACENERO
2.6.2.3.5.4
N DE PERSONAS
0.50
0.50
0.50
1.00
1.00
MESES
6.00
6.00
6.00
5.00
5.00
COSTO
SUB TOTAL
4,500.00
13,500.00
2,000.00
6,000.00
1,500.00
4,500.00
2,000.00
10,000.00
1,300.00
6,500.00
TOTAL
40,500.00
BIENES
S/.
UND.
FRASCO
LTS
PQTE
LTS
UND
UND
UND
CANTIDAD
5.00
5.00
5.00
5.00
50.00
25.00
10.00
P.U.
UND.
CANTIDAD
2.00
2.00
P.U.
SUB TOTAL
20.00
40.00
20.00
40.00
TOTAL
80.00
UND.
CANTIDAD
3.00
25.00
25.00
25.00
75.00
75.00
P.U.
SUB TOTAL
40.00
120.00
25.00
625.00
30.00
750.00
80.00
2,000.00
8.00
600.00
10.00
750.00
5.00
5.00
5.00
10.00
1.00
2.00
1.50
TOTAL
SUB TOTAL
25.00
25.00
25.00
50.00
50.00
50.00
15.00
240.00
2 MATERIALES DE LIMPIEZA
DESCRIPCIN
ESCOBA
RECOGEDOR DE PLASTICO
UND
UND
3 IMPLEMENTOS DE SEGURIDAD
DESCRIPCIN
CASCO TIPO JOKEY COLOR BLANCO
CASCO TIPO JOKEY DE COLOR
BOTAS DE JEBE
BOTAS DE CUERO
WANTES DE JEBE
WANTES DE CUERO
UND
UND
UND
UND
UND
UND
10,876.50
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS
I.E. DE CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI, CCUYO,
QUISINI, TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI, DISTRITO
DE MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
CHALECOS
CINTAS DE SEGURIDAD
ARNES
OTROS
UND
UND
UND
GLB
25.00
5.00
5.00
1.00
20.00
25.00
80.00
500.00
TOTAL
500.00
125.00
400.00
500.00
6,370.00
4 MATERIALES DE ESCRITORIO
DESCRIPCIN
PAPEL BOND 80 GR A-4
ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4
BORRADOR DE LPIZ FABER CASTELL
CD EN BLANCO
CORRECTOR
CUADERNO 100 HOJAS
LAPICERO COLOR ROJO
LAPICERO COLOR AZUL
LAPICERO COLOR NEGRO
RESALTADOR
PORTAMINAS
SELLO TRODAC
PAPEL BOND A3
CUADERNO DE OBRAS
FOLDER MANILA
PLUMONES
PIZARRA ACRILICA
CAMARA FOTOGRAFICA
USB
LAPTOP
IMPRESORA
OTROS
2.6.2.3.5.5
CANTIDAD
10.00
10.00
5.00
50.00
10.00
10.00
10.00
20.00
20.00
10.00
5.00
5.00
1.00
3.00
100.00
10.00
2.00
1.00
2.00
0.50
1.00
1.00
SERVICIOS
UND.
UND
UND
GLB
GLB
GLB
GLB
GLB
CANTIDAD
5.00
40.00
1.00
1.00
1.00
1.00
1.00
OTROS
UND.
UNID
UNID
CANTIDAD
120.00
225.00
18,750.00
P.U.
SUB TOTAL
30.00
150.00
30.00
1,200.00
1,800.00
1,800.00
800.00
800.00
1,000.00
1,000.00
13,500.00
13,500.00
300.00
300.00
TOTAL
18,750.00
S/.
DESCRIPCIN
GASOLINA
PETROLEO
P.U.
SUB TOTAL
30.00
300.00
6.00
60.00
0.30
1.50
1.00
50.00
1.50
15.00
3.00
30.00
1.00
10.00
1.00
20.00
1.00
20.00
3.00
30.00
6.00
30.00
20.00
100.00
50.00
50.00
30.00
90.00
0.50
50.00
3.00
30.00
60.00
120.00
500.00
500.00
40.00
80.00
3,800.00
1,900.00
300.00
300.00
400.00
400.00
TOTAL
4,186.50
S/.
DESCRIPCIN
LEGALIZACION DE CUADERNO DE OBRAS
ROTURA DE BRIQUETAS
ESTUDIO DE SUELOS
DISEO DE MEZCLAS
IMPRESION DE PLANOS
TRANSPORTE
OTROS
2.6.2.3.5.6
UND.
MLL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
MLL
UND
UND
UND
UND
UND
UND
UND
UND
UND
4,710.00
P.U.
SUB TOTAL
13.00
1,560.00
14.00
3,150.00
TOTAL
4,710.00
S/.
74,836.50
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS I.E. DE
CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI, CCUYO, QUISINI,
TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI, DISTRITO DE
MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
2.6.2.3.5.3
2.6.2.3.5.4
2.6.2.3.5.5
2.6.2.3.5.6
PERSONAL
BIENES
SERVICIOS
OTROS
ESPECIFICA DE GASTOS
G. GRALES
11,250.00
1,583.40
7,500.00
2,655.00
22,988.40
PERSONAL
11,250.00
11,250.00
1 JORNAL
DEL EMPLEADO EVENTUAL
CARGO
SUPERVISOR DE OBRA
2.6.2.3.5.4
N DE PERSONAS
0.50
MESES
5.00
COSTO
4,500.00
TOTAL
BIENES
SUB TOTAL
11,250.00
11,250.00
S/.
1,583.40
3 IMPLEMENTOS DE SEGURIDAD
DESCRIPCIN
CASCO TIPO JOKEY COLOR BLANCO
CASCO TIPO JOKEY DE COLOR
OTROS
UND.
CANTIDAD
1.00
1.00
1.00
P.U.
40.00
30.00
500.00
TOTAL
SUB TOTAL
40.00
30.00
500.00
570.00
UND.
CANTIDAD
5.00
4.00
3.00
10.00
3.00
3.00
3.00
5.00
5.00
3.00
3.00
2.00
0.50
1.00
30.00
5.00
1.00
0.50
1.00
1.00
P.U.
30.00
6.00
0.30
1.00
1.50
3.00
1.00
1.00
1.00
3.00
6.00
20.00
50.00
30.00
0.50
3.00
60.00
500.00
40.00
300.00
TOTAL
SUB TOTAL
150.00
24.00
0.90
10.00
4.50
9.00
3.00
5.00
5.00
9.00
18.00
40.00
25.00
30.00
15.00
15.00
60.00
250.00
40.00
300.00
1,013.40
UND
UND
GBL
4 MATERIALES DE ESCRITORIO
DESCRIPCIN
PAPEL BOND 80 GR A-4
ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4
BORRADOR DE LPIZ FABER CASTELL
CD EN BLANCO
CORRECTOR
CUADERNO 100 HOJAS
LAPICERO COLOR ROJO
LAPICERO COLOR AZUL
LAPICERO COLOR NEGRO
RESALTADOR
PORTAMINAS
SELLO TRODAC
PAPEL BOND A3
CUADERNO DE OBRAS
FOLDER MANILA
PLUMONES
PIZARRA ACRILICA
CAMARA FOTOGRAFICA
USB
OTROS
2.6.2.3.5.5
MLL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
MLL
UND
UND
UND
UND
UND
UND
GLB
SERVICIOS
S/.
DESCRIPCIN
TRANSPORTE
IMPRESIN PLANOS
OTROS
UND.
GLB
GLB
GLB
CANTIDAD
1.00
1.00
1.00
P.U.
7,000.00
300.00
500.00
TOTAL
SUB TOTAL
7,000.00
300.00
500.00
7,500.00
7,500.00
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS I.E. DE
CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI, CCUYO, QUISINI,
TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI, DISTRITO DE
MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
2.6.2.3.5.6
OTROS
S/.
DESCRIPCIN
GASOLINA
PETROLEO
UND.
UNID
UNID
CANTIDAD
75.00
120.00
P.U.
13.00
14.00
TOTAL
2,655.00
SUB TOTAL
975.00
1,680.00
2,655.00
S/.
22,988.40
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS
I.E. DE CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI,
CCUYO, QUISINI, TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI,
DISTRITO DE MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
2.6.2.3.5.3
2.6.2.3.5.4
2.6.2.3.5.5
2.6.2.3.5.6
ESPECIFICA DE GASTOS
G. GRALES
PERSONAL
3,500.00
BIENES
882.60
SERVICIOS
1,200.00
OTROS
675.00
TOTAL GASTOS LIQUIDACION
6,257.60
DESAGREGADO DEL PRESUPUESTO ANALTICO
GASTOS DE LIQUIDACION
2.6.2.3.5.3
PERSONAL
3,500.00
3,500.00
1 JORNAL
DEL EMPLEADO EVENTUAL
CARGO
PROFESIONAL LIQUIDADOR
PROFESIONAL TECNICO
ASISTENTE ADMINISTRATIVO
2.6.2.3.5.4
N DE PERSONAS CANTIDAD
1.00
1.00
1.00
1.00
1.00
1.00
BIENES
COSTO
SUB TOTAL
1,800.00
1,800.00
1,000.00
1,000.00
700.00
700.00
TOTAL
3,500.00
S/.
3 IMPLEMENTOS DE SEGURIDAD
DESCRIPCIN
CASCO TIPO JOKEY COLOR BLANCO
CASCO TIPO JOKEY DE COLOR
BOTAS DE CUERO
OTROS
UND.
CANTIDAD
1.00
1.00
0.00
0.00
P.U.
SUB TOTAL
40.00
40.00
30.00
30.00
0.00
0.00
0.00
0.00
TOTAL
70.00
UND.
CANTIDAD
3.00
2.00
2.00
5.00
2.00
2.00
2.00
3.00
3.00
2.00
2.00
1.00
0.50
20.00
5.00
1.00
P.U.
SUB TOTAL
30.00
90.00
6.00
12.00
0.30
0.60
1.00
5.00
1.50
3.00
3.00
6.00
1.00
2.00
1.00
3.00
1.00
3.00
3.00
6.00
6.00
12.00
20.00
20.00
50.00
25.00
0.50
10.00
3.00
15.00
60.00
60.00
UND
UND
UND
UND
4 MATERIALES DE ESCRITORIO
DESCRIPCIN
PAPEL BOND 80 GR A-4
ARCHIVADOR DE LOMO ANCHO PARA FORMATO A-4
BORRADOR DE LPIZ FABER CASTELL
CD EN BLANCO
CORRECTOR
CUADERNO 100 HOJAS
LAPICERO COLOR ROJO
LAPICERO COLOR AZUL
LAPICERO COLOR NEGRO
RESALTADOR
PORTAMINAS
SELLO TRODAC
PAPEL BOND A3
FOLDER MANILA
PLUMONES
PIZARRA ACRILICA
MLL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
MLL
UND
UND
UND
882.60
PROYECTO
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA DE LAS
I.E. DE CHECTUYOC, SULLCA, SILLY, MAMUERA, HUISCACHANI,
CCUYO, QUISINI, TAIHUA, TOXACCOTA, CHURUBAMBA Y QUENAMARI,
DISTRITO DE MARANGANI - CANCHIS - CUSCO
SUB: PROYECTO
CAMARA FOTOGRAFICA
USB
OTROS
2.6.2.3.5.5
UND
UND
GLB
SERVICIOS
DESCRIPCIN
UND.
GLB
GLB
CANTIDAD
1.00
1.00
OTROS
300.00
40.00
200.00
812.60
UND.
UNID
UNID
CANTIDAD
25.00
25.00
1,200.00
P.U.
SUB TOTAL
700.00
700.00
500.00
500.00
TOTAL
1,200.00
S/.
DESCRIPCIN
GASOLINA
PETROLEO
600.00
40.00
200.00
TOTAL
S/.
TRANSPORTE
IMPRESIN PLANOS
2.6.2.3.5.6
0.50
1.00
1.00
675.00
P.U.
SUB TOTAL
13.00
325.00
14.00
350.00
TOTAL
675.00
S/.
6,257.60
SUB PROYECTO:
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA ESCOLARIZADO EN LA I.E. 56463 DE LA
C.C. DE TAIHUA
S/. 824,263.69
Presupuesto total
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES
TOTAL S/.
686,431.19
10.90%
74,836.50
GASTOS DE SUPERVISION
3.35%
22,988.40
LIQUIDACION
0.91%
6,257.60
MOBILIARIO Y EQUIPAMIENTO
33,750.00
TOTAL
824,263.69