PLANILLA DE METRADOS

OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

01.00.00

MUROS Y TABIQUES DE ALBAILERIA

01.01.00

MUROS DE LADRILLO KING KONG DE SOGA EN SOTANO,


PLANTA 1 Y 2
Sotano
EJE C
a
b
c
EJE D
a
b
c
EJE E
a
b
c
d
e
f
EJE E' SSHH
a
b
c
EJE 2'
a
EJE 5'
a
EJE 5
a
b
EJE 6' SSHH
a
b
EJE 7
a
b
v1
v2
v3
v6

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

m2

NBTF
6/25/2012
Total

989.15

1.00
1.00
1.00

5.40
1.88
1.88

3.00
3.00
3.00

16.20
5.64
5.64

1.00
1.00
1.00

3.61
3.98
0.25

3.00
3.00
3.00

10.83
11.94
0.75

1.00
1.00
1.00
1.00
1.00
1.00

4.15
2.20
4.92
5.40
1.20
1.23

3.00
3.00
3.00
3.00
3.00
3.00

12.45
6.60
14.76
16.20
3.60
3.69

1.00
1.00
1.00

1.60
2.30
5.00

3.40
3.40
3.40

5.44
7.82
17.00

1.00

8.75

3.40

29.75

1.00

4.00

3.00

12.00

1.00
1.00

4.00
2.25

3.00
3.00

12.00
6.75

1.00
1.00

3.57
6.60

3.40
3.40

12.14
22.44

1.00
1.00

4.22
4.15

3.00
3.00

12.66
12.45

-4.00
-16.00
-12.00
-1.00

0.65
0.80
0.60
3.22

0.80
0.80
0.60
2.80

-2.08
-10.24
-4.32
-9.02

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v7
planta 1
EJE A
a
b
c
d
EJE B
a
b
c
EJE C
a
b
c
EJE D
a
b
EJE E
a
b
EJE F
a
b
EJE G
a
b
c
d
e
SSHH
Ingreso
Central
Posterior
EJE 1
a
b
c
d
e
EJE 2

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
0.60

Sub Total
Area

Sub Total

-2.00

Long.
1.66

1.00
1.00
1.00
1.00

5.00
5.48
5.55
3.40

2.80
2.80
2.80
2.80

14.00
15.34
15.54
9.52

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

1.00
1.00
1.00

2.15
2.10
2.85

2.80
2.80
2.80

6.02
5.88
7.98

1.00
1.00

3.92
3.90

2.80
2.80

10.98
10.92

1.00
1.00

3.42
3.90

2.80
2.80

9.58
10.92

1.00
1.00

5.50
4.05

2.80
2.80

15.40
11.34

1.00
1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92
3.40

2.80
2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98
9.52

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00
1.00
1.00

4.23
4.05
3.70
3.75
3.75

2.80
2.80
2.80
2.80
2.80

11.84
11.34
10.36
10.50
10.50

-1.99

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
c
EJE 3'
EJE 4
a
b
c
EJE 5'
a
b
EJE 5
a
EJE 6
a
EJE 7
a
b
c
EJE 8
a
b
v4
v5
v9
v10
v11
v12
v14
v16
v19
v22
v23

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80
2.80

Sub Total
Area

Sub Total

1.00
1.00
1.00

Long.
6.50
2.43
2.43

1.00
1.00

2.70
0.80

3.20
3.20

8.64
2.56

1.00
1.00
1.00

7.25
4.22
3.93

2.80
2.80
2.80

20.30
11.82
11.00

1.00

4.00

3.20

12.80

1.00
1.00
1.00

7.25
4.20
3.93

2.80
2.80
2.80

20.30
11.76
11.00

1.00
1.00

4.00
3.98

2.80
2.80

11.20
11.14

1.00

3.98

2.80

11.14

1.00

7.15

2.80

20.02

1.00
1.00
1.00

2.68
2.65
4.23

2.80
2.80
2.80

7.50
7.42
11.84

1.00
1.00

6.60
1.80

2.80
2.80

18.48
5.04

-1.00
-2.00
-1.00
-1.00
-2.00
-1.00
-3.00
-1.00
-2.00
-1.00
-2.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
2.40
1.80
3.12

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
1.80
1.90
2.65

-0.44
-12.78
-7.78
-2.75
-8.00
-8.40
-28.62
-4.86
-8.64
-3.42
-16.54

18.20
6.80
6.80

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v25
planta 2
EJE B
a
b
c
EJE C
b
c
EJE D'
a
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4
a
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.50

Sub Total
Area

Sub Total

-1.00

Long.
2.68

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

1.00
1.00

2.10
2.85

2.80
2.80

5.88
7.98

1.00
1.00

4.00
6.25

3.20
3.20

12.80
20.00

1.00
1.00
1.00
1.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

9.58
10.92

1.00

5.50

2.80

15.40

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00

6.50
4.23
2.43

2.80
2.80
2.80

18.20
11.84
6.80

1.00
1.00

2.70
0.80

3.20
3.20

8.64
2.56

1.00
1.00

7.25
1.95

2.80
2.80

20.30
5.46

1.00
1.00

7.25
1.95

2.80
2.80

20.30
5.46

-6.70

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8
a
a'
b
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
01.02.00

MUROS DE LADRILLO KING KONG DE SOGA EN PLANTA 3 Y 4


planta 3, 4
EJE B
a
b
c
EJE C
b
c
EJE D'
a

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00
1.00

4.00
1.95
3.98

2.80
2.80
2.80

11.20
5.46

1.00

3.98

2.80

11.14

1.00

7.15

2.80

20.02

1.00
1.00

1.20
1.20

2.80
2.80

3.36
3.36

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-2.00
-16.00
-1.00
-3.00
-1.00
-2.00
-2.00
-1.00
-3.00
-2.00
-1.00
-1.00
-1.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

-1.04
-10.24
-0.44
-19.17
-7.78
-5.49
-8.00
-8.40
-28.62
-9.72
-7.20
-3.42
-8.27

m2

NBTF
6/25/2012
Total

558.34

2.00
2.00
2.00

5.27
5.40
1.27

2.80
2.80
2.80

29.51
30.24
7.11

2.00
2.00

2.10
2.85

2.80
2.80

11.76
15.96

2.00

4.00

3.20

25.60

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4
a
b
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.20

Sub Total
Area

Sub Total

2.00

Long.
6.25

2.00
2.00
2.00
2.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

19.15
21.84

2.00

5.50

2.80

30.80

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

2.00
2.00
2.00

4.25
5.85
5.20

3.20
3.20
3.20

27.20
37.44
33.28

2.00
2.00
2.00

6.50
4.23
2.43

2.80
2.80
2.80

36.40
23.69
13.61

2.00
2.00

2.70
0.80

3.20
3.20

17.28
5.12

2.00
2.00

7.25
1.95

2.80
2.80

40.60
10.92

2.00
2.00

7.25
1.95

2.80
2.80

40.60
10.92

2.00
2.00
2.00

4.00
1.95
3.98

2.80
2.80
2.80

22.40
10.92

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00
2.00

1.20
1.20

2.80
2.80

6.72
6.72

40.00

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

a
a'
b
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
01.03.00

MUROS DE LADRILLO KING KONG DE SOGA EN PLANTA 5 Y 6


planta 5
EJE B
a
b
c
EJE C
b
c
EJE E
Sobre puerta
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2

Nro. Veces
2.00
2.00
2.00

Long.
5.30
2.10
1.80

-4.00
-32.00
-2.00
-6.00
-2.00
-4.00
-4.00
-2.00
-6.00
-4.00
-2.00
-2.00
-2.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80
2.80
0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

29.68
11.76
10.08
-2.08
-20.48
-0.88
-38.34
-15.56
-10.98
-16.00
-16.80
-57.24
-19.44
-14.40
-6.84
-16.54

m2

277.92

1.00
1.00
1.00

5.27
5.40
1.27

3.20
3.20
3.20

16.86
17.28
4.06

1.00
1.00

3.90
0.33

2.80
2.80

10.92
0.92

1.00

1.80

2.80

5.04

1.00

5.50

2.80

15.40

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
3.20
3.20
3.20

15.82
11.68
17.28
12.54

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

a
b
c
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8
a
a'
b
v1
v5
v8
v14
v15
v17
v18
v20
v22
v24
AZOTEA
Fondo
Frente
Izquierda
02.00.0

REVOQUES, ENLUCIDOS Y MOLDURAS

02.01.00

TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES


MEZC. C:A 1:5 EN SOTANO, PLANTA 01 Y 02
Sotano
SS HH Varones
derecha
izquierda

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.20
3.20
3.20

Sub Total
Area

Sub Total

1.00
1.00
1.00

Long.
6.50
4.23
2.43

1.00
1.00
1.00

4.00
1.95
3.98

3.20
3.20
3.20

12.80
6.24

1.00

3.98

2.80

11.14

1.00

7.15

2.80

20.02

1.00
1.00

1.20
1.20

2.80
2.80

3.36
3.36

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-2.00
-1.00
-2.00
-1.00
-1.00
-1.00
-1.00
-2.00
-1.00
-1.00

0.65
3.55
2.50
3.60
5.05
5.55
1.35
1.00
1.80
3.00

0.80
1.80
2.80
2.65
3.00
3.00
3.00
3.20
1.90
3.20

-1.04
-6.39
-14.00
-9.54
-15.15
-16.65
-4.05
-6.40
-3.42
-9.60

1.00
1.00
1.00

19.79
23.50
19.30

1.00
1.00
1.00

19.79
23.50
19.30

NBTF
6/25/2012
Total

20.80
13.54
7.78

m2

253.81

1.00
1.00

2.20
2.40

3.40
3.40

7.48
8.16

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
Planta 1 a 2
SS HH Varones
derecha
izquierda
fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
SS HH Direcin
derecha
izquierda
fondo
frente
02.02.00

TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES


MEZC. C:A 1:5 EN PLANTA 03 Y 04
Planta 3 Y 4
SS HH Varones
derecha
izquierda
fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
SS HH Direcin
derecha
izquierda
fondo
frente

Nro. Veces
1.00
1.00

Long.
3.98
3.43

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.00
3.40

Sub Total
Area

Sub Total

11.05
11.39
12.99

1.90
2.80
5.20

3.20
3.20
3.20
2.80

12.16
17.92
33.28
-

2.00
2.00
2.00
2.00

2.10
2.90
2.03
5.20

3.20
3.20
2.80
3.20

13.44
18.56
11.37
33.28

2.00
2.00
2.00
2.00

1.27
0.65
2.40
2.05

3.20
3.20
3.20
2.80

8.13
4.16
15.36
11.48

3.25
3.35

2.00
2.00
2.00
2.00

3.82

6/25/2012
Total

11.94
11.66

3.40
3.40
3.00
3.40

1.00
1.00
1.00
1.00

NBTF

m2

179.14

2.00
2.00
2.00
2.00

1.90
2.80
5.20

3.20
3.20
3.20
2.80

12.16
17.92
33.28
-

2.00
2.00
2.00
2.00

2.10
2.90
2.03
5.20

3.20
3.20
2.80
3.20

13.44
18.56
11.37
33.28

2.00
2.00
2.00
2.00

1.27
0.65
2.40
2.05

3.20
3.20
3.20
2.80

8.13
4.16
15.36
11.48

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

02.03.00

DESCRIPCIN

TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES


MEZC. C:A 1:5 EN PLANTA 05

Und

TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A


1:5, E = 1.5 cm EN SOTANO Y PLANTAS 1 Y 2
Sotano
EJE C
a
b
c
EJE D
a
b
c
EJE E
a
b
c
d
e
f
EJE E' SSHH
a
b
c
EJE 2'
a
EJE 5'
a
EJE 5

Long.

Dimensiones
B
b

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

m2

Planta 5
SS HH Varones
derecha
izquierda
fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
02.04.00

Nro. Veces

Regin:

NBTF
6/25/2012
Total

74.43

1.00
1.00
1.00
1.00

1.90
2.80
5.20

3.40
3.40
3.40
3.00

6.46
9.52
17.68
-

1.00
1.00
1.00
1.00

2.10
2.90
2.03
5.20

3.40
3.40
3.00
3.40

7.14
9.86
6.09
17.68

m2

1,509.17

2.00
2.00
2.00

5.40
1.88
1.88

3.00
3.00
3.00

32.40
11.28
11.28

2.00
2.00
2.00

3.61
3.98
0.25

3.00
3.00
3.00

21.66
23.88
1.50

2.00
2.00
2.00
2.00
2.00
2.00

4.15
2.20
4.92
5.40
1.20
1.23

3.00
3.00
3.00
3.00
3.00
3.00

24.90
13.20
29.52
32.40
7.20
7.38

2.00
2.00
2.00

1.60
2.30
5.00

3.40
3.40
3.40

10.88
15.64
34.00

2.00

8.75

3.40

59.50

2.00

4.00

3.00

24.00

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
a
b
EJE 6' SSHH
a
b
EJE 7
a
b
v1
v2
v3
v6
v7
planta 1
EJE B
a
b
c
EJE C
a
b
c
EJE D
a
b
EJE E
a
b
EJE F
a
b
EJE G
a
b
c
d
e
SSHH
Ingreso
Central

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.00
3.00

Sub Total
Area

Sub Total

2.00
2.00

Long.
4.00
2.25

2.00
2.00

3.57
6.60

3.40
3.40

24.28
44.88

2.00
2.00

4.22
4.15

3.00
3.00

25.32
24.90

-8.00
-32.00
-12.00
-2.00
-2.00

0.65
0.80
0.60
3.22
1.66

0.80
0.80
0.60
2.80
0.60

-4.16
-20.48
-4.32
-18.03
-1.99

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

2.00
2.00
2.00

2.15
2.10
2.85

2.80
2.80
2.80

12.04
11.76
15.96

2.00
2.00

3.92
3.90

2.80
2.80

21.95
21.84

2.00
2.00

3.42
3.90

2.80
2.80

19.15
21.84

2.00
2.00

5.50
4.05

2.80
2.80

30.80
22.68

1.00
1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92
3.40

2.80
2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98
9.52

1.00
1.00

4.25
5.85

3.20
3.20

13.60
18.72

24.00
13.50

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
c
EJE 3'
EJE 4
a
b
c
EJE 5'
a
b
EJE 5
a
EJE 6
a
EJE 7
a
b
c
EJE 8
a
b
v4
v5
v9
v10
v11
v12
v14
v16
v19

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.20

Sub Total
Area

Sub Total

1.00

Long.
5.20

1.00
1.00
1.00

6.50
2.43
2.43

2.80
2.80
2.80

18.20
6.80
6.80

1.00
1.00

2.70
0.80

3.20
3.20

8.64
2.56

2.00
2.00
2.00

7.25
4.22
3.93

2.80
2.80
2.80

40.60
23.63
22.01

2.00

4.00

3.20

25.60

2.00
2.00
2.00

7.25
4.20
3.93

2.80
2.80
2.80

40.60
23.52
22.01

2.00
2.00

4.00
3.98

2.80
2.80

22.40
22.29

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00
2.00
2.00

2.68
2.65
4.23

2.80
2.80
2.80

15.01
14.84
23.69

1.00
1.00

6.60
1.80

2.80
2.80

18.48
5.04

-1.00
-2.00
-2.00
-2.00
-2.00
-1.00
-6.00
-2.00
-2.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
2.40

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
1.80

-0.44
-12.78
-15.56
-5.49
-8.00
-8.40
-57.24
-9.72
-8.64

16.64

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v22
v23
v25
planta 2
EJE B
a
b
c
EJE C
b
c
EJE D'
a
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
1.90
2.65
2.50

Sub Total
Area

Sub Total

-1.00
-4.00
-2.00

Long.
1.80
3.12
2.68

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

2.00
2.00

2.10
2.85

2.80
2.80

11.76
15.96

2.00
2.00

4.00
6.25

3.20
3.20

25.60
40.00

2.00
2.00
2.00
2.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

19.15
21.84

2.00

5.50

2.80

30.80

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00

6.50
4.23
2.43

2.80
2.80
2.80

18.20
11.84
6.80

2.00
2.00

2.70
0.80

3.20
3.20

17.28
5.12

2.00
2.00

7.25
1.95

2.80
2.80

40.60
10.92

-3.42
-33.07
-13.40

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

a
b
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8
a
a'
b
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
02.05.00

TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A


1:5, E = 1.5 cm EN PLANTAS 3 Y 4
planta 3, 4
EJE B
a
b
c
EJE C
b
c

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80

Sub Total
Area

Sub Total

2.00
2.00

Long.
7.25
1.95

2.00
2.00
2.00

4.00
1.95
3.98

2.80
2.80
2.80

22.40
10.92

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00
2.00

1.20
1.20

2.80
2.80

6.72
6.72

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-4.00
-32.00
-1.00
-3.00
-2.00
-4.00
-2.00
-1.00
-6.00
-2.00
-1.00
-1.00
-2.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

-2.08
-20.48
-0.44
-19.17
-15.56
-10.98
-8.00
-8.40
-57.24
-9.72
-7.20
-3.42
-16.54

NBTF
6/25/2012
Total

40.60
10.92

m2

812.71

2.00
2.00
2.00

5.27
5.40
1.27

2.80
2.80
2.80

29.51
30.24
7.11

4.00
4.00

2.10
2.85

2.80
2.80

23.52
31.92

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
EJE D'
a
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4
a
b
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

4.00
4.00

4.00
6.25

3.20
3.20

51.20
80.00

4.00
4.00
4.00
4.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

38.30
43.68

4.00

5.50

2.80

61.60

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

2.00
2.00
2.00

4.25
5.85
5.20

3.20
3.20
3.20

27.20
37.44
33.28

2.00
2.00
2.00

6.50
4.23
2.43

2.80
2.80
2.80

36.40
23.69
13.61

2.00
2.00

2.70
0.80

3.20
3.20

17.28
5.12

4.00
4.00

7.25
1.95

2.80
2.80

81.20
21.84

4.00
4.00

7.25
1.95

2.80
2.80

81.20
21.84

4.00
4.00
4.00

4.00
1.95
3.98

2.80
2.80
2.80

44.80
21.84

4.00

3.98

2.80

44.58

4.00

7.15

2.80

80.08

4.00

1.20

2.80

13.44

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

b
EJE 8
a
a'
b
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
02.06.00

TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A


1:5, E = 1.5 cm EN PLANTAS 5 Y 6
planta 5
EJE B
a
b
c
EJE C
b
c
EJE E
Sobre puerta
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80

Sub Total
Area

Sub Total

4.00

Long.
1.20

2.00
2.00
2.00

5.30
2.10
1.80

2.80
2.80
2.80

29.68
11.76
10.08

-8.00
-64.00
-2.00
-6.00
-4.00
-8.00
-4.00
-2.00
-12.00
-4.00
-2.00
-2.00
-4.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

-4.16
-40.96
-0.88
-38.34
-31.11
-21.96
-16.00
-16.80
-114.48
-19.44
-14.40
-6.84
-33.07

NBTF
6/25/2012
Total

13.44

m2

353.13

1.00
1.00
1.00

5.27
5.40
1.27

3.20
3.20
3.20

16.86
17.28
4.06

2.00
2.00

3.90
0.33

2.80
2.80

21.84
1.85

2.00

1.80

2.80

10.08

2.00

5.50

2.80

30.80

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
3.20
3.20
3.20

15.82
11.68
17.28
12.54

1.00
1.00

4.25
5.85

3.20
3.20

13.60
18.72

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Posterior
EJE 2
a
b
c
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8
a
a'
b
v1
v5
v8
v14
v15
v17
v18
v20
v22
v24
AZOTEA
Fondo
Frente
Izquierda
02.07.00

TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A


1:5, E = 1.5 cm EN SOTANO Y PLANTAS 1 Y 2
planta 1
EJE A
a

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.20

Sub Total
Area

Sub Total

1.00

Long.
5.20

1.00
1.00
1.00

6.50
4.23
2.43

3.20
3.20
3.20

20.80
13.54
7.78

2.00
2.00
2.00

4.00
1.95
3.98

3.20
3.20
3.20

25.60
12.48

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00
2.00

1.20
1.20

2.80
2.80

6.72
6.72

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-4.00
-1.00
-2.00
-2.00
-1.00
-1.00
-1.00
-2.00
-2.00
-1.00

0.65
3.55
2.50
3.60
5.05
5.55
1.35
1.00
1.80
3.00

0.80
1.80
2.80
2.65
3.00
3.00
3.00
3.20
1.90
3.20

-2.08
-6.39
-14.00
-19.08
-15.15
-16.65
-4.05
-6.40
-6.84
-9.60

1.00
1.00
1.00

19.79
23.50
19.30

1.00
1.00
1.00

19.79
23.50
19.30

NBTF
6/25/2012
Total

16.64

m2

418.46

2.00

5.00

2.80

28.00

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
b
c
d
EJE B
a
b
c
EJE G
a
b
c
d
e
EJE 1
a
b
c
d
e
EJE 2
a
b
c
EJE 8
a
b
v4
v5
v11
v12
v19
v22
planta 2
EJE B
a
b
c
EJE G
a
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80
2.80

Sub Total
Area

Sub Total

2.00
2.00
2.00

Long.
5.48
5.55
3.40

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

1.00
1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92
3.40

2.80
2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98
9.52

2.00
2.00
2.00
2.00
2.00

4.23
4.05
3.70
3.75
3.75

2.80
2.80
2.80
2.80
2.80

23.69
22.68
20.72
21.00
21.00

1.00
1.00
1.00

6.50
2.43
2.43

2.80
2.80
2.80

18.20
6.80
6.80

1.00
1.00

6.60
1.80

2.80
2.80

18.48
5.04

-1.00
-2.00
-2.00
-1.00
-2.00
-1.00

0.55
3.55
2.50
3.00
2.40
1.80

0.80
1.80
1.60
2.80
1.80
1.90

-0.44
-12.78
-8.00
-8.40
-8.64
-3.42

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

1.00
1.00

5.65
3.65

2.80
2.80

15.82
10.22

30.69
31.08
19.04

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

c
d
EJE 2
a
b
c
EJE 8
a
a'
b
v4
v5
v11
v12
v16
v21
v22
02.08.00

TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A


1:5, E = 1.5 cm EN PLANTAS 3 Y 4
planta 3, 4
EJE B
a
b
c
EJE G
a
b
c
d
EJE 2
a
b
c
EJE 8
a
a'
b
v4
v5

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80

Sub Total
Area

Sub Total

1.00
1.00

Long.
5.40
3.92

1.00
1.00
1.00

6.50
4.23
2.43

2.80
2.80
2.80

18.20
11.84
6.80

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-1.00
-3.00
-2.00
-1.00
-2.00
-1.00
-1.00

0.55
3.55
2.50
3.00
2.43
3.00
1.80

0.80
1.80
1.60
2.80
2.00
2.40
1.90

-0.44
-19.17
-8.00
-8.40
-9.72
-7.20
-3.42

NBTF
6/25/2012
Total

15.12
10.98

m2

183.65

2.00
2.00
2.00

5.27
5.40
1.27

2.80
2.80
2.80

29.51
30.24
7.11

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

2.00
2.00
2.00

6.50
4.23
2.43

2.80
2.80
2.80

36.40
23.69
13.61

2.00
2.00
2.00

5.30
2.10
1.80

2.80
2.80
2.80

29.68
11.76
10.08

-2.00
-6.00

0.55
3.55

0.80
1.80

-0.88
-38.34

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

v11
v12
v16
v21
v22
02.09.00

TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A


1:5, E = 1.5 cm EN PLANTAS 5 Y 6
planta 5
EJE B
a
b
c
EJE G
a
b
c
d
EJE 2
a
b
c
EJE 8
a
a'
b
v5
v8
v15
v17
v18
v20
v22
v24
AZOTEA
Fondo
Frente
Izquierda

Nro. Veces
-4.00
-2.00
-4.00
-2.00
-2.00

Long.
2.50
3.00
2.43
3.00
1.80

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
1.60
2.80
2.00
2.40
1.90

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

-16.00
-16.80
-19.44
-14.40
-6.84

m2

150.33

1.00
1.00
1.00

5.27
5.40
1.27

3.20
3.20
3.20

16.86
17.28
4.06

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
3.20
3.20
3.20

15.82
11.68
17.28
12.54

1.00
1.00
1.00

6.50
4.23
2.43

3.20
3.20
3.20

20.80
13.54
7.78

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-1.00
-2.00
-1.00
-1.00
-1.00
-2.00
-1.00
-1.00

3.55
2.50
5.05
5.55
1.35
1.00
1.80
3.00

1.80
2.80
3.00
3.00
3.00
3.20
1.90
3.20

-6.39
-14.00
-15.15
-16.65
-4.05
-6.40
-3.42
-9.60

1.00
1.00
1.00

19.79
23.50
19.30

1.00
1.00
1.00

19.79
23.50
19.30

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.
02.10.00

DESCRIPCIN
VESTIDURA DE DERRAMES, ANCHO = 0.15 M EN VENTANAS
Sotano
v1
v2
v3
v6
v7
planta 1
v4
v5
v9
v10
v11
v12
v14
v16
v19
v22
v23
v25
planta 2
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
planta 3, 4
v1
v2
v4
v5
v9
v10

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total
1,111.86

4.00
16.00
12.00
1.00
2.00

0.65
0.80
0.60
3.22
1.66

0.80
0.80
0.60
2.80
0.60

2.90
3.20
2.40
12.04
4.52

11.60
51.20
28.80
12.04
9.04

1.00
2.00
1.00
1.00
2.00
1.00
3.00
1.00
2.00
1.00
2.00
1.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
2.40
1.80
3.12
2.68

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
1.80
1.90
2.65
2.50

2.70
10.70
11.20
7.90
8.20
11.60
12.50
8.86
8.40
7.40
11.54
10.36

2.70
21.40
11.20
7.90
16.40
11.60
37.50
8.86
16.80
7.40
23.08
10.36

2.00
16.00
1.00
3.00
1.00
2.00
2.00
1.00
3.00
2.00
1.00
1.00
1.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

2.90
3.20
2.70
10.70
11.20
7.90
8.20
11.60
12.50
8.86
10.80
7.40
11.54

5.80
51.20
2.70
32.10
11.20
15.80
16.40
11.60
37.50
17.72
10.80
7.40
11.54

4.00
32.00
2.00
6.00
2.00
4.00

0.65
0.80
0.55
3.55
2.55
0.90

0.80
0.80
0.80
1.80
3.05
3.05

2.90
3.20
2.70
10.70
11.20
7.90

11.60
102.40
5.40
64.20
22.40
31.60

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

v11
v12
v14
v16
v21
v22
v23
planta 5
v1
v5
v8
v14
v15
v17
v18
v20
v22
v24
02.11.00

02.12.00

VESTIDURA DE DERRAMES, ANCHO = 0.15 M EN PUERTAS


P1
P2
P3
P4
P5
P6

VESTIDURA DE DERRAMES, ANCHO = 0.15 M EN MAMPARAS

M1
M2
02.13.00

VESTIDURA DE COLUMNAS CON CEMENTO:ARENA


COLUMNAS EN SOTANO
CR 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea

Nro. Veces
4.00
2.00
6.00
4.00
2.00
2.00
2.00

Long.
2.50
3.00
3.60
2.43
3.00
1.80
3.12

2.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

0.65
3.55
2.50
3.60
5.05
5.55
1.35
1.00
1.80
3.00

16.00
41.00
7.00
2.00
1.00
5.00

2.00
1.00

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
1.60
2.80
2.65
2.00
2.40
1.90
2.65

Sub Total
Area

Sub Total

8.20
11.60
12.50
8.86
10.80
7.40
11.54

32.80
23.20
75.00
35.44
21.60
14.80
23.08

0.80
1.80
2.80
2.65
3.00
3.00
3.00
3.20
1.90
3.20

2.90
10.70
10.60
12.50
16.10
17.10
8.70
8.40
7.40
12.40

5.80
10.70
21.20
12.50
16.10
17.10
8.70
16.80
7.40
12.40

0.80
1.50
1.60
7.70
1.32
1.80

2.50
2.50
2.50
3.00
2.50
2.50

5.80
6.50
6.60
13.70
6.32
6.80

92.80
266.50
46.20
27.40
6.32
34.00

2.00
2.00

2.50
4.00

9.00
12.00

18.00
12.00

NBTF
6/25/2012
Total

473.22

30.00

m2

626.08

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

1.40
1.40
1.40
1.40
1.40
1.40
1.40

8.40
7.84
7.84
7.84
7.84
8.40
2.80

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
CR 02
Sotano
planta 1
planta 2
planta 3
planta 4
CR 03
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CR 04
Sotano
planta 1
CT 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CT 02
Sotano
planta 1
planta 2
planta 3
planta 4
CL 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CC 01
Sotano
planta 1

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

4.00
4.00
4.00
4.00
4.00

3.00
2.80
2.80
2.80
2.80

1.80
1.80
1.40
1.40
1.40

1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

1.80
1.40
1.40
1.40
1.40
1.40
1.40

8.00
8.00

3.00
2.80

1.40
1.40

5.00
5.00
5.00
5.00
5.00
5.00
4.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

2.20
2.20
2.20
2.20
2.20
2.20
2.20

2.00
2.00
2.00
2.00
2.00

3.00
2.80
2.80
2.80
2.80

2.20
2.20
2.20
2.20
2.20

3.00
3.00
3.00
3.00
3.00
3.00
2.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.00
1.00

3.00
2.80

1.57
1.57

Sub Total
21.60
20.16
15.68
15.68
15.68
5.40
3.92
3.92
3.92
3.92
4.20
1.40
33.60
31.36
33.00
30.80
30.80
30.80
30.80
33.00
8.80
13.20
12.32
12.32
12.32
12.32
18.00
16.80
16.80
16.80
16.80
18.00
4.00
4.71
4.40

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

planta 2
planta 3
planta 4
Auditorio
02.14.00

VESTIDURA DE MUROS DE CORTE CON CEMENTO:ARENA


Placa 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 01 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 02
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 02 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 03
Sotano
planta 1
planta 2

Nro. Veces
Long.
1.00
1.00
1.00
1.00

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80
2.80
3.00

Sub Total
Area
1.57
1.57
1.57
1.57

Sub Total

NBTF
6/25/2012
Total

4.40
4.40
4.40
4.71

m2

4,332.97
2.00
2.00
2.00
2.00
2.00
2.00
2.00

12.35
12.35
12.35
12.35
12.35
12.35
12.35

3.60
3.40
3.40
3.40
3.40
3.60
1.00

88.92
83.98
83.98
83.98
83.98
88.92
24.70

6.00
6.00
6.00
6.00
6.00
6.00
6.00

0.55
0.55
0.55
0.55
0.55
0.55
0.55

3.60
3.40
3.40
3.40
3.40
3.60
1.00

11.88
11.22
11.22
11.22
11.22
11.88
3.30

2.00
2.00
2.00
2.00
2.00
2.00
2.00

5.38
5.38
5.38
5.38
5.38
5.38
5.38

3.60
3.40
3.40
3.40
3.40
3.60
1.00

38.74
36.58
36.58
36.58
36.58
38.74
10.76

4.00
4.00
4.00
4.00
4.00
4.00
4.00

0.55
0.55
0.55
0.55
0.55
0.55
0.55

3.60
3.40
3.40
3.40
3.40
3.60
1.00

7.92
7.48
7.48
7.48
7.48
7.92
2.20

2.00
2.00
2.00

1.67
1.67
1.67

3.60
3.40
3.40

12.02
11.36
11.36

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
planta 3
planta 4
Auditorio
Azotea
Placa 03 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 04
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 04 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 05
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 05 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00

Long.
1.67
1.67
1.67
1.67

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

1.66
1.56
1.56
1.56
1.56
1.66
0.46

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.67
1.67
1.67
1.67
1.67
1.67
1.67

3.60
3.40
3.40
3.40
3.40
3.60
1.00

12.02
11.36
11.36
11.36
11.36
12.02
3.34

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

1.66
1.56
1.56
1.56
1.56
1.66
0.46

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.20
4.20
4.20
4.20
4.20
4.20
4.20

3.60
3.40
3.40
3.40
3.40
3.60
1.00

30.24
28.56
28.56
28.56
28.56
30.24
8.40

2.00
2.00
2.00
2.00
2.00

1.05
1.05
1.05
1.05
1.05

3.60
3.40
3.40
3.40
3.40

7.56
7.14
7.14
7.14
7.14

11.36
11.36
12.02
3.34

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
Auditorio
Azotea
Placa 06
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 06 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 07
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 07 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 08
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00

Long.
1.05
1.05

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.51
1.51
1.51
1.51
1.51
1.51
1.51

3.60
3.40
3.40
3.40
3.40
3.60
1.00

10.87
10.27
10.27
10.27
10.27
10.87
3.02

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.25
0.25
0.25
0.25
0.25
0.25
0.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

1.80
1.70
1.70
1.70
1.70
1.80
0.50

2.00
2.00
2.00
2.00
2.00
2.00
2.00

6.45
6.45
6.45
6.45
6.45
6.45
6.45

3.60
3.40
3.40
3.40
3.40
3.60
1.00

46.44
43.86
43.86
43.86
43.86
46.44
12.90

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.29
1.29
1.29
1.29
1.29
1.29
1.29

3.60
3.40
3.40
3.40
3.40
3.60
1.00

9.29
8.77
8.77
8.77
8.77
9.29
2.58

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.23
2.23
2.23
2.23
2.23
2.23
2.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

16.06
15.16
15.16
15.16
15.16
16.06
4.46

7.56
2.10

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
Placa 09
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 09 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 10
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 10 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 11
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 12
Sotano

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.10
2.10
2.10
2.10
2.10
2.10
2.10

3.60
3.40
3.40
3.40
3.40
3.60
1.00

15.12
14.28
14.28
14.28
14.28
15.12
4.20

4.00
4.00
4.00
4.00
4.00
4.00
4.00

1.98
1.98
1.98
1.98
1.98
1.98
1.98

3.60
3.40
3.40
3.40
3.40
3.60
1.00

28.51
26.93
26.93
26.93
26.93
28.51
7.92

2.00
2.00
2.00
2.00
2.00
2.00
2.00

5.35
5.35
5.35
5.35
5.35
5.35
5.35

3.60
3.40
3.40
3.40
3.40
3.60
1.00

38.52
36.38
36.38
36.38
36.38
38.52
10.70

2.00
2.00
2.00
2.00
2.00
2.00
2.00

13.33
13.33
13.33
13.33
13.33
13.33
13.33

3.60
3.40
3.40
3.40
3.40
3.60
1.00

95.98
90.64
90.64
90.64
90.64
95.98
26.66

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.25
4.25
4.25
4.25
4.25
4.25
4.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

30.60
28.90
28.90
28.90
28.90
30.60
8.50

2.00

4.25

3.60

30.60

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 13
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 13 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 14
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 14 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 15
Sotano
planta 1
planta 2

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.40
3.40
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00
2.00
2.00

Long.
4.25
4.25
4.25
4.25
4.25
4.25

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.43
4.43
4.43
4.43
4.43
4.43
4.43

3.60
3.40
3.40
3.40
3.40
3.60
1.00

31.90
30.12
30.12
30.12
30.12
31.90
8.86

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.25
1.25
1.25
1.25
1.25
1.25
1.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

9.00
8.50
8.50
8.50
8.50
9.00
2.50

2.00
2.00
2.00

3.75
3.75
3.75

3.60
3.40
3.40

27.00
25.50
25.50

28.90
28.90
28.90
28.90
30.60
8.50

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN

Und

planta 3
planta 4
Auditorio
Azotea
Placa 15 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 16
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 16 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
02.15.00

VESTIDURA DE VIGAS CON CEMENTO:ARENA


FONDO
VP - N 01
VP - N 02
VP - N 03
VP - N 04
VP - N 05
VP - N 06
VP - N 07
VP - N 08
VP - N 09
VP - N 10
VP - N 11

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00

Long.
3.75
3.75
3.75
3.75

4.00
4.00
4.00
4.00
4.00
4.00
4.00

3.85
3.85
3.85
3.85
3.85
3.85
3.85

3.60
3.40
3.40
3.40
3.40
3.60
1.00

55.44
52.36
52.36
52.36
52.36
55.44
15.40

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.75
1.75
1.75
1.75
1.75
1.75
1.75

3.60
3.40
3.40
3.40
3.40
3.60
1.00

12.60
11.90
11.90
11.90
11.90
12.60
3.50

NBTF
6/25/2012
Total

25.50
25.50
27.00
7.50

m2

753.79
6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.00
6.00
6.00
6.00

0.90
9.51
11.35
13.05
16.85
5.65
5.85
5.50
4.92
7.45
3.45

0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.30
0.25

1.62
14.27
17.03
19.58
25.28
8.48
8.78
1.38
7.38
13.41
5.18

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
VP - N 12
VP - N 13
VP - N 14
VP - 1 15
VP - 1 16
VP - N 15
VP - N 16
VS - 101 BLOQUE A
VS - 101 BLOQUE B
VS - 102 EJE A-B
VS - 102 EJE C-D
VS - 102 EJE D-E
VS - 102 EJE D-E
VS - 102 EJE E-F
VS - 102 EJE F-G
VS - 102 EJE F-G
VS - 100
VS - 100'
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VIGA BORDE DIRECCION
VIGA BORDE FRENTE
VIGA BORDE FRENTE
VIGA BORDE SOBRE SOTANO
VIGA VORDE VB 02
LATERALES
VP - N 01
VP - N 02
VP - N 03
VP - N 04
VP - N 05
VP - N 06
VP - N 07
VP - N 08

Und

Nro. Veces

Dimensiones
B
b
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

6.00
4.00
4.00
1.00
1.00
4.00
5.00

Long.
14.46
16.26
16.26
20.36
16.16
16.06
12.76

18.00
16.00
2.00
6.00
6.00
34.00
41.00
23.00
6.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

7.70
7.75
3.70
4.36
1.69
3.75
4.23
4.43
1.80
3.75
2.68
5.65
5.48
5.55
3.40
3.70
3.75
3.75

0.30
0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

41.58
37.20
1.85
6.54
2.54
31.88
43.36
25.47
2.70
1.88
1.34
2.83
2.74
2.78
1.70
1.85
1.88
1.88

5.00
5.00
2.00
1.00
1.00

3.50
3.50
6.00
10.20
7.74

0.15
0.15
0.15
0.15
0.20

2.63
2.63
1.80
1.53
1.55

6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.00

0.90
9.51
11.35
13.05
16.85
5.65
5.85
5.50

0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25

21.69
16.26
16.26
5.09
4.04
16.06
15.95

1.20
0.80
0.80
0.80
0.80
0.80
0.80
0.80

1.94
11.41
13.62
15.66
20.22
6.78
7.02
1.10

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

VP - N 09
VP - N 10
VP - N 11
VP - N 12
VP - N 13
VP - N 14
VP - 1 15
VP - 1 16
VP - N 15
VP - N 16
VS - 101 BLOQUE A
VS - 101 BLOQUE B
VS - 102 EJE A-B
VS - 102 EJE C-D
VS - 102 EJE D-E
VS - 102 EJE D-E
VS - 102 EJE E-F
VS - 102 EJE F-G
VS - 102 EJE F-G
VS - 100
VS - 100'
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VIGA BORDE DIRECCION
VIGA BORDE FRENTE
VIGA BORDE FRENTE
VIGA BORDE SOBRE SOTANO
VIGA VORDE VB 02
02.16.00

VESTIDURA DE MUROS DE CONCRETO CON CEMENTO:ARENA


MC 1
MC 2
MC 3
MC 4

Nro. Veces

Dimensiones
B
b
0.25
0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
0.80
1.20
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

Sub Total
Area

Sub Total

6.00
6.00
6.00
6.00
4.00
4.00
1.00
1.00
4.00
5.00

Long.
4.92
7.45
3.45
14.46
16.26
16.26
20.36
16.16
16.06
12.76

18.00
16.00
2.00
6.00
6.00
34.00
41.00
23.00
6.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

7.70
7.75
3.70
4.36
1.69
3.75
4.23
4.43
1.80
3.75
2.68
5.65
5.48
5.55
3.40
3.70
3.75
3.75

0.30
0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40

16.63
14.88
1.48
5.23
2.03
25.50
34.69
20.38
2.16
1.50
1.07
1.13
1.10
1.11
0.68
0.74
0.75
0.75

5.00
5.00
2.00
1.00
1.00

3.50
3.50
6.00
10.20
7.74

0.15
0.15
0.15
0.15
0.20

0.20
0.20
0.20
0.20
0.20

0.53
0.53
0.36
0.31
0.31

NBTF
6/25/2012
Total

5.90
16.09
4.14
17.35
13.01
13.01
4.07
3.23
12.85
12.76

m2

241.02
1.00
1.00
1.00
1.00

4.00
3.00
1.80
5.65

3.20
3.20
3.20
3.20

12.80
9.60
5.76
18.08

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

MC 5
MC 6
MC 7
MC 8
MC 9
MC 10
MC 11
MC 12
MC 13
MC 14
MC 15
MC 16
MC 17
MC 18
03.00.00
03.01.00

CIELORRASOS
CIELORRASO CON MEZC. C:A 1:5, E = 1.5 cm
Losa 01
ENTREPISO 1
Ar 2
Ar 3
Ar 4
Ar 5
Ar 6
Ar 7
Ar 8
Ar 9
Ar 10
Ar 11
Ar 13
Ar 14
Ar 15
Ar 16
Ar 18
Ar 19
Ar 20
Ar 21
Ar 22
Ar 24
Ar 25
Ar 26
Ar 27

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20

Sub Total
Area

Sub Total

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Long.
3.43
5.40
3.92
3.40
4.18
4.23
3.65
3.55
3.60
3.40
5.55
5.48
4.93
6.15

6.00

5.85

2.82

98.98

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
3.75
3.75
3.75
3.75
4.28
7.70
3.75
3.75
4.23

3.60
3.60
5.85
5.85
5.85
5.85
5.75
5.75
5.75
5.75
5.35
5.35
5.35
5.35
2.00
1.82
2.00
5.85
5.85
5.85
5.85
5.85
5.85

15.23
15.48
45.34
22.70
24.75
25.16
44.56
22.31
24.32
24.73
41.46
20.76
22.63
23.01
7.50
6.83
7.50
21.94
25.04
45.05
21.94
21.94
24.75

NBTF
6/25/2012
Total

10.98
17.28
12.54
10.88
13.38
13.54
11.68
11.36
11.52
10.88
17.76
17.54
15.78
19.68

m2

3,307.82

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

03.02.00

DESCRIPCIN

Und

Nro. Veces

Ar 28
Ar 29
Ar 30
Ar 31
Ar 32
Ar 33
Ar 34
Ar 29

1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00

Long.
4.18
7.70
2.67
1.08
2.67
4.23
4.18
7.70

ENTREPISO 2, 3, 4 Y 5
Ar 4
Ar 5
Ar 6
Ar 7
Ar 8
Ar 9
Ar 10
Ar 11
Ar 13
Ar 14
Ar 15
Ar 16
Ar 18
Ar 19
Ar 20
Ar 21
Ar 22
Ar 24
Ar 25
Ar 26
Ar 27
Ar 28
Ar 29
Ar 34
Ar 29

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
3.75
3.75
3.75
3.75
4.28
7.70
3.75
3.75
4.23
4.18
7.70
4.18
5.45

CIELORRASO MODULAR TIPO CIELOTEX


sotano
Museo Documental
Sala de Exibicin Mltiple
Almacn
planta 5

Dimensiones
B
b
5.85
5.78
5.78
3.16
5.78
5.78
5.78
1.00

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

24.45
44.51
15.43
6.83
15.43
24.45
24.16
7.70

181.35
90.79
98.98
100.62
178.25
89.24
97.29
98.90
165.85
83.03
90.52
92.02
30.00
27.30
30.00
87.75
100.15
180.18
87.75
87.75
98.98
97.81
178.02
96.64
21.80

5.85
5.85
5.85
5.85
5.75
5.75
5.75
5.75
5.35
5.35
5.35
5.35
2.00
1.82
2.00
5.85
5.85
5.85
5.85
5.85
5.85
5.85
5.78
5.78
1.00

m2

636.65
1.00
1.00
1.00

50.94
51.11
21.70

50.94
51.11
21.70

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Sala de Reuniones
Auditorio
Sobre area de ingreso
03.03.00

04.00.00
04.01.00

04.02.00

VESTIDURA DE FONDO DE ESCALERA


Escalera Frente
Escalera Centro
Escalera Fondo
PISOS Y PAVIMENTOS
LOSA DE C S F'C=210 KG/CM2
sotano
Rampa de acceso
Acceso principal
Estacionamiento
planta 1
Vereda exterior
Rampa inicial
Rampa tramo II
Descanzo Rampa
CONTRAPISO, E = 4.70 cm, ACABADO PULIDO Y BRUADO

CONTRAPISO, E = 4.00 cm, EN SOTANO Y PLANTAS 1 A 2


sotano
Museo Documental
Hall de Distribucin
Sala de Exibicin Mltiple
Almacn
SS HH Damas
SS HH Varones
Zona de llegada y clasif.
Repositorio General

Long.

Dimensiones
B
b

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00
1.00

95.65
358.85
58.40

95.65
358.85
58.40

5.00
5.00
6.00

15.45
15.40
12.63

77.25
77.00
75.78

m2

NBTF
6/25/2012
Total

Observaciones

230.03

m2

155.09
1.00
1.00
1.00

94.26
15.25
14.80

94.26
15.25
14.80

1.00
1.00
1.00
1.00

13.96
4.20
3.44
9.18

13.96
4.20
3.44
9.18

m2

sotano
Estacionamiento
planta 1
Vereda exterior
Rampa inicial
Rampa tramo II
Descanzo Rampa
Terraza
04.03.00

Nro. Veces

Regin:

Sobre losa de ciment.


Sobre losa de ciment.

401.26
1.00

338.13

338.13

1.00
1.00
1.00
1.00
1.00

13.96
4.20
3.44
9.18
32.35

13.96
4.20
3.44
9.18
32.35

m2

1,866.67
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

50.94
103.43
51.11
21.70
15.28
14.57
59.49
127.30

50.94
103.43
51.11
21.70
15.28
14.57
59.49
127.30

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN

Und

Circulacin Peatonal
planta 1
Oficina de personal
Recepcin
Ventanilas
Hall de Espera
Acceso escalera frontal
Llenado de Formularios
Asesoria Legal
Hall de Distribucin
Of. Recursos Humanos
SS HH Damas
SS HH Varones
Cuarto de Limpieza
Direcin ARP
Secretara
SS HH Direccin
Oficina Televigilancia
Tecnologa e Informtica
Gestin y Desarrollo Institucional
Sala de Espera
Planificacin y Presupuesto
planta 2
Biblioteca
Hall de Distribucin
Sala de Investigacin
SS HH Damas
SS HH Varones
Puerta de Escape
Corredor
Cuaro de Limpieza
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
Secretara
SS HH Direccin
04.04.00

CONTRAPISO, E = 4.00 cm, EN PLANTAS 3 Y 4


planta 3
Biblioteca
Hall de Distribucin

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00

34.77

34.77

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

47.44
50.17
28.16
115.70
9.45
26.44
43.23
96.31
47.90
15.29
14.57
3.16
20.02
24.68
3.65
10.76
34.20
51.60
48.64
25.81

47.44
50.17
28.16
115.70
9.45
26.44
43.23
96.31
47.90
15.29
14.57
3.16
20.02
24.68
3.65
10.76
34.20
51.60
48.64
25.81

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

95.65
47.40
76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

95.65
47.40
76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

m2

NBTF
6/25/2012
Total

1,341.80
1.00
1.00

95.65
47.40

95.65
47.40

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN

Und

Sala de Investigacin
SS HH Damas
SS HH Varones
Puerta de Escape
Corredor
Cuaro de Limpieza
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
Secretara
SS HH Direccin
planta 4
Biblioteca
Hall de Distribucin
Sala de Investigacin
SS HH Damas
SS HH Varones
Puerta de Escape
Corredor
Cuarto de Limpieza
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
Secretara
SS HH Direccin
04.05.00

04.06.00

CONTRAPISO, E = 4.00 cm, EN PLANTAS 5 Y 6


planta 5
Sala de Reuniones
Vestbulo
Cuarto de servicio Multiples
SS HH Damas
SS HH Varones
Puerta de Escape
Cuarto de Limpieza
Auditorio
planta 6
Azotea

m2

PISO DE PARQUET OREJA DE LEON 6 X 30 CM VETEADO

m2

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

95.65
47.40
76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

95.65
47.40
76.50
15.29
14.57
9.45
72.36
3.16
53.91
154.74
57.23
20.01
46.97
3.66

NBTF
6/25/2012
Total

1,084.39
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

95.65
147.24
25.18
15.29
14.57
9.45
3.16
358.85

95.65
147.24
25.18
15.29
14.57
9.45
3.16
358.85

1.00

415.00

415.00
2,478.20

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
sotano
Museo Documental
Sala de Exibicin Mltiple
Zona de llegada y clasif.
Repositorio General
planta 1
Oficina de personal
Ventanilas
Llenado de Formularios
Asesoria Legal
Of. Recursos Humanos
Direcin ARP
Oficina Televigilancia
Tecnologa e Informtica
Gestin y Desarrollo Institucional
Planificacin y Presupuesto
planta 2
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 3
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 4
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 5
Sala de Reuniones
Cuarto de servicio Multiples
Auditorio

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00
1.00
1.00

50.94
51.11
59.49
127.30

50.94
51.11
59.49
127.30

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

47.44
28.16
26.44
43.23
47.90
20.02
10.76
34.20
51.60
25.81

47.44
28.16
26.44
43.23
47.90
20.02
10.76
34.20
51.60
25.81

1.00
1.00
1.00
1.00
1.00
1.00

95.65
76.50
53.91
154.74
57.23
20.01

95.65
76.50
53.91
154.74
57.23
20.01

1.00
1.00
1.00
1.00
1.00
1.00

95.65
76.50
53.91
154.74
57.23
20.01

95.65
76.50
53.91
154.74
57.23
20.01

1.00
1.00
1.00
1.00
1.00
1.00

95.65
76.50
53.91
154.74
57.23
20.01

95.65
76.50
53.91
154.74
57.23
20.01

1.00
1.00
1.00

95.65
25.18
358.85

95.65
25.18
358.85

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.
04.07.00

04.08.00

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN

Und

PISO PORCELANATO
sotano
Hall de Distribucin
Circulacin Peatonal
planta 1
Hall de Espera
Acceso escalera frontal
Hall de Distribucin
Secretara
Sala de Espera
planta 2
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
SS HH Direccin
planta 3
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
planta 4
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
planta 5
Vestbulo
Puerta de Escape

m2

PISO CERAMICO ALTO TRANSITO


sotano
Almacn
SS HH Damas
SS HH Varones
planta 1
SS HH Damas
SS HH Varones
Cuarto de Limpieza
SS HH Direccin
planta 2
SS HH Damas

m2

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total
1,121.87

1.00
1.00

103.43
34.77

103.43
34.77

1.00
1.00
1.00
1.00
1.00

115.70
9.45
96.31
24.68
48.64

115.70
9.45
96.31
24.68
48.64

1.00
1.00
1.00
1.00
1.00

47.40
9.45
72.36
46.97
3.66

47.40
9.45
72.36
46.97
3.66

1.00
1.00
1.00
1.00

47.40
9.45
72.36
46.97

47.40
9.45
72.36
46.97

1.00
1.00
1.00
1.00

47.40
9.45
72.36
46.97

47.40
9.45
72.36
46.97

1.00
1.00

147.24
9.45

147.24
9.45
231.28

1.00
1.00
1.00

21.70
15.28
14.57

21.70
15.28
14.57

1.00
1.00
1.00
1.00

15.29
14.57
3.16
3.65

15.29
14.57
3.16
3.65

1.00

15.29

15.29

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

SS HH Varones
Cuaro de Limpieza
SS HH Direccin
planta 3
SS HH Damas
SS HH Varones
Cuaro de Limpieza
SS HH Direccin
planta 4
SS HH Damas
SS HH Varones
Cuarto de Limpieza
SS HH Direccin
planta 5
SS HH Damas
SS HH Varones
Cuarto de Limpieza
04.09.00

04.10.00

05.00.00
05.01.00

PISO DE PIEDRA 30 cm, CORTE MAQUINA


sotano
Acceso principal
planta 1
Recepcin

m2

PISO DE LADRILLO PASTELERO


planta 1
Terraza
planta 6
Azotea

m2

CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO, H = 0.10 M
sotano
Estacionamiento
planta 1
Vereda exterior
Rampa inicial
Rampa tramo II
Descanzo Rampa
Terraza

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00
1.00

14.57
3.16
3.66

14.57
3.16
3.66

1.00
1.00
1.00
1.00

15.29
14.57
3.16
3.66

15.29
14.57
3.16
3.66

1.00
1.00
1.00
1.00

15.29
14.57
3.16
3.66

15.29
14.57
3.16
3.66

1.00
1.00
1.00

15.29
14.57
3.16

15.29
14.57
3.16

NBTF
6/25/2012
Total

65.47
1.00

15.30

15.30

1.00

50.17

50.17
447.35

1.00

32.35

32.35

1.00

415.00

415.00

163.87
1.00

87.37

87.37

1.00
1.00
1.00
1.00
1.00

22.60
3.40
7.80
17.80
24.90

22.60
3.40
7.80
17.80
24.90

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.
05.02.00

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
CONTRAZOCALO DE MADERA AGUANO 3/4" X 4" RODON DE
3/4"
sotano
Museo Documental
Sala de Exibicin Mltiple
Zona de llegada y clasif.
Repositorio General
planta 1
Oficina de personal
Ventanilas
Llenado de Formularios
Asesoria Legal
Of. Recursos Humanos
Direcin ARP
Oficina Televigilancia
Tecnologa e Informtica
Gestin y Desarrollo Institucional
Planificacin y Presupuesto
planta 2
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 3
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 4
Biblioteca
Sala de Investigacin
Reprografa y Encuadernacin
Repositorio
Indices
Direccin
planta 5
Sala de Reuniones
Cuarto de servicio Multiples

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total
1,214.71

1.00
1.00
1.00
1.00

29.90
29.60
35.70
48.50

29.90
29.60
35.70
48.50

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

27.85
21.35
20.95
26.90
28.99
20.90
13.28
27.50
30.00
20.75

27.85
21.35
20.95
26.90
28.99
20.90
13.28
27.50
30.00
20.75

1.00
1.00
1.00
1.00
1.00
1.00

46.30
41.70
31.45
55.40
32.20
20.90

46.30
41.70
31.45
55.40
32.20
20.90

1.00
1.00
1.00
1.00
1.00
1.00

46.30
41.70
31.45
55.40
32.20
20.90

46.30
41.70
31.45
55.40
32.20
20.90

1.00
1.00
1.00
1.00
1.00
1.00

46.30
41.70
31.45
55.40
32.20
20.90

46.30
41.70
31.45
55.40
32.20
20.90

1.00
1.00

46.30
20.35

46.30
20.35

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Auditorio
05.03.00

06.00.00
06.01.00

CONTRAZOCALO DE CERAMICO 40 CM, H=0.10M


sotano
Hall de Distribucin
Circulacin Peatonal
planta 1
Hall de Espera
Acceso escalera frontal
Hall de Distribucin
Secretara
Sala de Espera
planta 2
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
SS HH Direccin
planta 3
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
planta 4
Hall de Distribucin
Puerta de Escape
Corredor
Secretara
planta 5
Vestbulo
Puerta de Escape
ZOCALOS
ZOCALO DE CERAMICO 30 x 30 cm
Sotano
SS HH Varones
derecha
izquierda
fondo
frente
Columna L
SS HH Damas

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

1.00

Sub Total
Area
82.04

Sub Total

NBTF
6/25/2012
Total

82.04

737.31
1.00
1.00

60.07
43.00

60.07
43.00

1.00
1.00
1.00
1.00
1.00

56.30
12.93
56.10
20.30
29.02

56.30
12.93
56.10
20.30
29.02

1.00
1.00
1.00
1.00
1.00

28.10
12.93
55.55
28.34
7.90

28.10
12.93
55.55
28.34
7.90

1.00
1.00
1.00
1.00

28.10
12.93
55.55
28.34

28.10
12.93
55.55
28.34

1.00
1.00
1.00
1.00

28.10
12.93
55.55
28.34

28.10
12.93
55.55
28.34

1.00
1.00

64.00
12.93

64.00
12.93

m2

508.44

1.00
1.00
1.00
1.00
1.00

2.20
2.40
3.98
3.43
0.70

2.40
2.40
2.40
2.40
2.40

5.28
5.76
9.55
8.23
1.68

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

derecha
izquierda
fondo
frente
Placa fondo
Planta 1 a 4
SS HH Varones
derecha
izquierda
fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
SS HH Direcin
derecha
izquierda
fondo
frente
Columna T
Planta 5
SS HH Varones
derecha
izquierda
fondo
frente
SS HH Damas
derecha
izquierda
fondo
frente
07.00.00

REVESTIMIENTOS

07.01.00

REVESTIMIENTO DE ESCALERA CON CERAMICO RUSTICO 40 x


40 cm
Escalera Frente
Escalera Centro
Escalera Fondo

08.00.00

CARPINTERIA DE MADERA

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.40
2.40
2.40
2.40
2.40

Sub Total
Area

Sub Total

1.00
1.00
1.00
1.00
1.00

Long.
3.25
3.35
5.20
3.82
3.02

4.00
4.00
4.00
4.00

1.90
2.80
5.20
5.20

2.40
2.40
2.40
2.40

18.24
26.88
49.92
49.92

4.00
4.00
4.00
4.00

2.10
2.90
5.20
5.20

2.40
2.40
2.40
2.40

20.16
27.84
49.92
49.92

4.00
4.00
4.00
4.00
4.00

1.27
0.65
2.40
2.05
0.63

2.40
2.40
2.40
2.40
2.40

12.19
6.24
23.04
19.68
6.05

1.00
1.00
1.00
1.00

1.90
2.80
5.20
5.20

2.40
2.40
2.40
2.40

4.56
6.72
12.48
12.48

1.00
1.00
1.00
1.00

2.10
2.90
5.20
5.20

2.40
2.40
2.40
2.40

5.04
6.96
12.48
12.48

80.00
101.00
101.00

0.47
0.47
0.47

NBTF
6/25/2012
Total

7.80
8.04
12.48
9.17
7.25

m2

229.08
1.80
1.80
1.60

67.68
85.45
75.95

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.
08.01.00

08.02.00

09.00.00
09.01.00

DESCRIPCIN

Und

PUERTA TABLERO REBAJADO E= 45mm, DE AGUANO


P1
P2
P3
P4
P5
P6

m2

MARCO DE MADERA AGUANO DE 6'' X 2''


P1
P2
P3
P4
P5
P6

ML

CARPINTERIA METALICA Y HERRERIA


PORTICO CENTRAL FRONTAL
FRONTAL

09.02.00

REJA

09.02.01

REJA METALICA PLEGABLE DE DOS CUERPOS CON TUBO


CUADRADO DE FIERRO

09.03.00

REJA METALICA METALICA FIJA CON TUBO CUADRADO


FRONTAL
PASAMANOS DE TUBO DE FIERRO 2" Y 1/2" e= 2 mm; H = 0,90
M
ESCALERA FRENTE
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PLANTA 6
ESCALERA CENTRO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4

Long.

Dimensiones
B
b

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total
285.75

32.00
153.75
28.00
46.20
3.30
22.50

16.00
41.00
7.00
2.00
1.00
5.00

0.80
1.50
1.60
7.70
1.32
1.80

2.50
2.50
2.50
3.00
2.50
2.50

16.00
41.00
7.00
2.00
1.00
5.00

0.80
1.50
1.60
7.70
1.32
1.80

2.50
2.50
2.50
3.00
2.50
2.50

1.00

7.90

12.30

97.17

1.00

11.80

3.00

35.40

1.00

13.15

3.00

39.45

473.22
5.80
6.50
6.60
13.70
6.32
6.80

92.80
266.50
46.20
27.40
6.32
34.00

M2

97.17

M2

FRONTAL
09.02.02

Nro. Veces

Regin:

35.40

M2

39.45

140.00
1.00
1.00
1.00
1.00
1.00
1.00

5.20
5.20
5.20
5.20
5.20
5.60

5.20
5.20
5.20
5.20
5.20
5.60

1.00
1.00
1.00
1.00

11.80
11.80
11.80
11.80

11.80
11.80
11.80
11.80

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

PLANTA 5
PLANTA 6
ESCALERA FONDO
SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PLANTA 6
09.04.00

BARANDA DE TUBO DE FIERRO 2" Y 1/2" e= 2 mm; H = 0,90 M

09.06.00

09.07.00

AGARRADERA PARA MINUSVALIDOS EN SS.HH., 2"


SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PLANTA 6

MARQUESINA DE INGRESO
FRONTAL

M2

10.01.00

VENTANA DE ALUMINIO TIPO SISTEMA CON VIDRIO


TEMPLADO DE 6 mm
Sotano
v3
v6

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

1.00
1.00

Long.
11.80
12.20

1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.60
5.20
5.20
5.20
5.20
5.20
5.60

5.60
5.20
5.20
5.20
5.20
5.20
5.60

1.00
1.00
2.00

14.60
10.80
1.35

14.60
10.80
2.70

NBTF
6/25/2012
Total

11.80
12.20

28.10

14.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

M2

CARPINTERIA DE ALUMINIO

Hecho:

Puno

PERSIANA DE TUBO DE 1"


PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5

10.00.00

Dimensiones
B
b

Puno

Prov.:

PLANTA 1 - RAMPA
PLANTA 1 - ESCALERA
PLANTA 1 - Of. Personal
09.05.00

Nro. Veces

Regin:

2.00
2.00
2.00
2.00
2.00
2.00
2.00
51.60

1.00
1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00
3.00

1.00

7.80

3.40
3.40
3.40
3.40
3.60

10.20
10.20
10.20
10.20
10.80
23.01
23.01

2.95

M2

528.96
12.00
1.00

0.60
3.22

0.60
2.80

4.32
9.02

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v7
planta 1
v4
v5
v9
v10
v11
v12
v14
v16
v19
v22
v23
v25
planta 2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
planta 3, 4
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
planta 5
v5
v8
v14

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
0.60

Sub Total
Area

Sub Total

2.00

Long.
1.66

1.00
2.00
1.00
1.00
2.00
1.00
3.00
1.00
2.00
1.00
2.00
1.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
2.40
1.80
3.12
2.68

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
1.80
1.90
2.65
2.50

0.44
12.78
7.78
2.75
8.00
8.40
28.62
4.86
8.64
3.42
16.54
6.70

1.00
3.00
1.00
2.00
2.00
1.00
3.00
2.00
1.00
1.00
1.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

0.44
19.17
7.78
5.49
8.00
8.40
28.62
9.72
7.20
3.42
8.27

2.00
6.00
2.00
4.00
4.00
2.00
6.00
4.00
2.00
2.00
2.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

0.88
38.34
15.56
10.98
16.00
16.80
57.24
19.44
14.40
6.84
16.54

1.00
2.00
1.00

3.55
2.50
3.60

1.80
2.80
2.65

6.39
14.00
9.54

1.99

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

v15
v17
v18
v20
v22
v24
11.00.00

CERRAJERIA

11.01.00

CERRADURA CILINDRICA EXT. FIJA CON LLAVE E INT.


SIEMPRE LIBRE SE FIJA CON LLAVE

1.00
1.00
1.00
2.00
1.00
1.00

CERRADURA CILINDRICA ABRE CON LLAVE INTERIOR Y


EXTERIOR

11.04.00

UND

CIERRAPUERTAS AEREO
INGRESO

UND

VIDRIOS, CRISTALES Y SIMILARES

12.01.00

VENTANA DE CRISTAL TEMPLADO DE 6MM CON ACCESORIOS


DE ALUMINIO, SISTEMA FIJO
Sotano
v1
v2
planta 2
v1
v2
planta 3, 4
v1
v2
planta 5
v1

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.00
3.00
3.00
3.20
1.90
3.20

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

Observaciones

15.15
16.65
4.05
6.40
3.42
9.60

16.00
16.00

UND

CERRADURA EXTERIOR ABRE CON LLAVE TRES GOLPES


M1

12.00.00

Dimensiones
B
b

Hecho:

Puno

16.00

P2
P3
P4
P5
P6
11.03.00

Long.
5.05
5.55
1.35
1.00
1.80
3.00

Puno

Prov.:

UND

P1
11.02.00

Nro. Veces

Regin:

56.00
41.00
7.00
2.00
1.00
5.00

41.00
7.00
2.00
1.00
5.00

2.00

2.00

2.00

2.00

2.00

2.00

M2

47.20
4.00
16.00

0.65
0.80

0.80
0.80

2.08
10.24

2.00
16.00

0.65
0.80

0.80
0.80

1.04
10.24

4.00
32.00

0.65
0.80

0.80
0.80

2.08
20.48

2.00

0.65

0.80

1.04

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.
12.02.00

DESCRIPCIN
PIEL DE VIDRIO DE 6MM CON ACCESORIOS DE ALUMINIO,
SISTEMA FIJO

Und

ESPEJO DE SS.HH. ( EMPOTRADO )


SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PLANTA 6

13.00.00

PINTURA

13.01.00

PINTURA DE CIELORRASOS C/ LATEX - 2 MANOS, C/


IMPRIMANTE
Losa 01
ENTREPISO 1
Ar 2
Ar 3
Ar 4
Ar 5
Ar 6
Ar 7
Ar 8
Ar 9
Ar 10
Ar 11
Ar 13
Ar 14
Ar 15

Long.

Dimensiones
B
b

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

M2

Direccin
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
Escalera centro
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
12.03.00

Nro. Veces

Regin:

NBTF
6/25/2012
Total
162.54

1.00
1.00
1.00
1.00
1.00

3.30
3.30
3.30
3.30
3.30

3.40
3.40
3.40
3.40
3.60

11.22
11.22
11.22
11.22
11.88

1.00
1.00
1.00
1.00
1.00

6.15
6.15
6.15
6.15
6.15

3.40
3.40
3.40
3.40
3.60

20.91
20.91
20.91
20.91
22.14

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.60
0.60
0.60
0.60
0.60
0.60
0.60

2.40
2.40
2.40
2.40
2.40
2.40
2.40

6.00

5.85

2.82

98.98

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23

3.60
3.60
5.85
5.85
5.85
5.85
5.75
5.75
5.75
5.75
5.35
5.35
5.35

15.23
15.48
45.34
22.70
24.75
25.16
44.56
22.31
24.32
24.73
41.46
20.76
22.63

M2

16.80

M2

3,307.82

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Nro. Veces

Ar 16
Ar 18
Ar 19
Ar 20
Ar 21
Ar 22
Ar 24
Ar 25
Ar 26
Ar 27
Ar 28
Ar 29
Ar 30
Ar 31
Ar 32
Ar 33
Ar 34
Ar 29

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00

Long.
4.30
3.75
3.75
3.75
3.75
4.28
7.70
3.75
3.75
4.23
4.18
7.70
2.67
1.08
2.67
4.23
4.18
7.70

ENTREPISO 2, 3, 4 Y 5
Ar 4
Ar 5
Ar 6
Ar 7
Ar 8
Ar 9
Ar 10
Ar 11
Ar 13
Ar 14
Ar 15
Ar 16
Ar 18
Ar 19
Ar 20
Ar 21
Ar 22
Ar 24
Ar 25
Ar 26
Ar 27
Ar 28

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
7.75
3.88
4.23
4.30
3.75
3.75
3.75
3.75
4.28
7.70
3.75
3.75
4.23
4.18

Dimensiones
B
b
5.35
2.00
1.82
2.00
5.85
5.85
5.85
5.85
5.85
5.85
5.85
5.78
5.78
3.16
5.78
5.78
5.78
1.00

5.85
5.85
5.85
5.85
5.75
5.75
5.75
5.75
5.35
5.35
5.35
5.35
2.00
1.82
2.00
5.85
5.85
5.85
5.85
5.85
5.85
5.85

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total
23.01
7.50
6.83
7.50
21.94
25.04
45.05
21.94
21.94
24.75
24.45
44.51
15.43
6.83
15.43
24.45
24.16
7.70

181.35
90.79
98.98
100.62
178.25
89.24
97.29
98.90
165.85
83.03
90.52
92.02
30.00
27.30
30.00
87.75
100.15
180.18
87.75
87.75
98.98
97.81

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Ar 29
Ar 34
Ar 29
13.02.00

PINTURA DE MUROS INTERIORES C/ LATEX SATINADO - 2


MANOS, C/ IMPRIMANTE
Sotano
EJE C
a
b
c
EJE D
a
b
c
EJE E
a
b
c
d
e
f
EJE E' SSHH
a
b
c
EJE 2'
a
EJE 5'
a
EJE 5
a
b
EJE 6' SSHH
a
b
EJE 7
a
b
v1
v2

Nro. Veces
4.00
4.00
4.00

Long.
7.70
4.18
5.45

Dimensiones
B
b
5.78
5.78
1.00

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

178.02
96.64
21.80

M2

8,628.88

2.00
2.00
2.00

5.40
1.88
1.88

3.00
3.00
3.00

32.40
11.28
11.28

2.00
2.00
2.00

3.61
3.98
0.25

3.00
3.00
3.00

21.66
23.88
1.50

2.00
2.00
2.00
2.00
2.00
2.00

4.15
2.20
4.92
5.40
1.20
1.23

3.00
3.00
3.00
3.00
3.00
3.00

24.90
13.20
29.52
32.40
7.20
7.38

2.00
2.00
2.00

1.60
2.30
5.00

3.40
3.40
3.40

10.88
15.64
34.00

2.00

8.75

3.40

59.50

2.00

4.00

3.00

24.00

2.00
2.00

4.00
2.25

3.00
3.00

24.00
13.50

2.00
2.00

3.57
6.60

3.40
3.40

24.28
44.88

2.00
2.00

4.22
4.15

3.00
3.00

25.32
24.90

-8.00
-32.00

0.65
0.80

0.80
0.80

-4.16
-20.48

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v3
v6
v7
planta 1
EJE B
a
b
c
EJE C
a
b
c
EJE D
a
b
EJE E
a
b
EJE F
a
b
EJE G
a
b
c
d
e
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
0.60
2.80
0.60

Sub Total
Area

Sub Total

-12.00
-2.00
-2.00

Long.
0.60
3.22
1.66

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

2.00
2.00
2.00

2.15
2.10
2.85

2.80
2.80
2.80

12.04
11.76
15.96

2.00
2.00

3.92
3.90

2.80
2.80

21.95
21.84

2.00
2.00

3.42
3.90

2.80
2.80

19.15
21.84

2.00
2.00

5.50
4.05

2.80
2.80

30.80
22.68

1.00
1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92
3.40

2.80
2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98
9.52

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00

6.50
2.43
2.43

2.80
2.80
2.80

18.20
6.80
6.80

1.00
1.00

2.70
0.80

3.20
3.20

8.64
2.56

2.00
2.00

7.25
4.22

2.80
2.80

40.60
23.63

-4.32
-18.03
-1.99

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
c
EJE 3'
EJE 4
a
b
c
EJE 5'
a
b
EJE 5
a
EJE 6
a
EJE 7
a
b
c
EJE 8
a
b
v4
v5
v9
v10
v11
v12
v14
v16
v19
v22
v23
v25
planta 2
EJE B
a
b
c
EJE C
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80

Sub Total
Area

Sub Total

2.00

Long.
3.93

2.00

4.00

3.20

25.60

2.00
2.00
2.00

7.25
4.20
3.93

2.80
2.80
2.80

40.60
23.52
22.01

2.00
2.00

4.00
3.98

2.80
2.80

22.40
22.29

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00
2.00
2.00

2.68
2.65
4.23

2.80
2.80
2.80

15.01
14.84
23.69

1.00
1.00

6.60
1.80

2.80
2.80

18.48
5.04

-1.00
-2.00
-2.00
-2.00
-2.00
-1.00
-6.00
-2.00
-2.00
-1.00
-4.00
-2.00

0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
2.40
1.80
3.12
2.68

0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
1.80
1.90
2.65
2.50

-0.44
-12.78
-15.56
-5.49
-8.00
-8.40
-57.24
-9.72
-8.64
-3.42
-33.07
-13.40

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

2.00

2.10

2.80

11.76

22.01

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
c
EJE D'
a
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4
a
b
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80

Sub Total
Area

Sub Total

2.00

Long.
2.85

2.00
2.00

4.00
6.25

3.20
3.20

25.60
40.00

2.00
2.00
2.00
2.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

19.15
21.84

2.00

5.50

2.80

30.80

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00

6.50
4.23
2.43

2.80
2.80
2.80

18.20
11.84
6.80

2.00
2.00

2.70
0.80

3.20
3.20

17.28
5.12

2.00
2.00

7.25
1.95

2.80
2.80

40.60
10.92

2.00
2.00

7.25
1.95

2.80
2.80

40.60
10.92

2.00
2.00
2.00

4.00
1.95
3.98

2.80
2.80
2.80

22.40
10.92

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

15.96

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
a
b
EJE 8
a
a'
b
v1
v2
v4
v5
v9
v10
v11
v12
v14
v16
v21
v22
v23
planta 3, 4
EJE B
a
b
c
EJE C
b
c
EJE D'
a
b
EJE E
Sobre puerta
a
b
c
EJE F
a
EJE G
a
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80

Sub Total
Area

Sub Total

2.00
2.00

Long.
1.20
1.20

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-4.00
-32.00
-1.00
-3.00
-2.00
-4.00
-2.00
-1.00
-6.00
-2.00
-1.00
-1.00
-2.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50
3.00
3.60
2.43
3.00
1.80
3.12

0.80
0.80
0.80
1.80
3.05
3.05
1.60
2.80
2.65
2.00
2.40
1.90
2.65

-2.08
-20.48
-0.44
-19.17
-15.56
-10.98
-8.00
-8.40
-57.24
-9.72
-7.20
-3.42
-16.54

2.00
2.00
2.00

5.27
5.40
1.27

2.80
2.80
2.80

29.51
30.24
7.11

4.00
4.00

2.10
2.85

2.80
2.80

23.52
31.92

4.00
4.00

4.00
6.25

3.20
3.20

51.20
80.00

4.00
4.00
4.00
4.00

1.80
3.42
3.90
5.75

2.80
2.80
2.80
2.80

38.30
43.68

4.00

5.50

2.80

61.60

2.00
2.00

5.65
3.65

2.80
2.80

31.64
20.44

6.72
6.72

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
SSHH Direccin
a
b
EJE 3
a
b
EJE 4
a
b
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a
b
EJE 8
a
a'
b
v1
v2
v4
v5
v9
v10
v11

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80

Sub Total
Area

Sub Total

2.00
2.00

Long.
5.40
3.92

2.00
2.00
2.00

4.25
5.85
5.20

3.20
3.20
3.20

27.20
37.44
33.28

2.00
2.00
2.00

6.50
4.23
2.43

2.80
2.80
2.80

36.40
23.69
13.61

2.00
2.00

2.70
0.80

3.20
3.20

17.28
5.12

4.00
4.00

7.25
1.95

2.80
2.80

81.20
21.84

4.00
4.00

7.25
1.95

2.80
2.80

81.20
21.84

4.00
4.00
4.00

4.00
1.95
3.98

2.80
2.80
2.80

44.80
21.84

4.00

3.98

2.80

44.58

4.00

7.15

2.80

80.08

4.00
4.00

1.20
1.20

2.80
2.80

13.44
13.44

2.00
2.00
2.00

5.30
2.10
1.80

2.80
2.80
2.80

29.68
11.76
10.08

-8.00
-64.00
-2.00
-6.00
-4.00
-8.00
-4.00

0.65
0.80
0.55
3.55
2.55
0.90
2.50

0.80
0.80
0.80
1.80
3.05
3.05
1.60

-4.16
-40.96
-0.88
-38.34
-31.11
-21.96
-16.00

30.24
21.95

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v12
v14
v16
v21
v22
v23
planta 5
EJE B
a
b
c
EJE C
b
c
EJE E
Sobre puerta
EJE F
a
EJE G
a
b
c
d
SSHH
Ingreso
Central
Posterior
EJE 2
a
b
c
EJE 5'
a
b
c
EJE 5
a
EJE 6
a
EJE 7
a

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.65
2.00
2.40
1.90
2.65

Sub Total
Area

Sub Total

-2.00
-12.00
-4.00
-2.00
-2.00
-4.00

Long.
3.00
3.60
2.43
3.00
1.80
3.12

1.00
1.00
1.00

5.27
5.40
1.27

3.20
3.20
3.20

16.86
17.28
4.06

2.00
2.00

3.90
0.33

2.80
2.80

21.84
1.85

2.00

1.80

2.80

10.08

2.00

5.50

2.80

30.80

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
3.20
3.20
3.20

15.82
11.68
17.28
12.54

1.00
1.00
1.00

4.25
5.85
5.20

3.20
3.20
3.20

13.60
18.72
16.64

1.00
1.00
1.00

6.50
4.23
2.43

3.20
3.20
3.20

20.80
13.54
7.78

2.00
2.00
2.00

4.00
1.95
3.98

3.20
3.20
3.20

25.60
12.48

2.00

3.98

2.80

22.29

2.00

7.15

2.80

40.04

2.00

1.20

2.80

6.72

-16.80
-114.48
-19.44
-14.40
-6.84
-33.07

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
b
EJE 8
a
a'
b
v1
v5
v8
v14
v15
v17
v18
v20
v22
v24
AZOTEA
Fondo
Frente
Izquierda
CR 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CR 02
Sotano
planta 1
planta 2
planta 3
planta 4
CR 03
Sotano
planta 1
planta 2
planta 3
planta 4

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80

Sub Total
Area

Sub Total

2.00

Long.
1.20

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-4.00
-1.00
-2.00
-2.00
-1.00
-1.00
-1.00
-2.00
-2.00
-1.00

0.65
3.55
2.50
3.60
5.05
5.55
1.35
1.00
1.80
3.00

0.80
1.80
2.80
2.65
3.00
3.00
3.00
3.20
1.90
3.20

-2.08
-6.39
-14.00
-19.08
-15.15
-16.65
-4.05
-6.40
-6.84
-9.60

1.00
1.00
1.00

19.79
23.50
19.30

1.00
1.00
1.00

19.79
23.50
19.30

6.72

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

1.40
1.40
1.40
1.40
1.40
1.40
1.40

4.00
4.00
4.00
4.00
4.00

3.00
2.80
2.80
2.80
2.80

1.80
1.80
1.40
1.40
1.40

1.00
1.00
1.00
1.00
1.00

3.00
2.80
2.80
2.80
2.80

1.80
1.40
1.40
1.40
1.40

8.40
7.84
7.84
7.84
7.84
8.40
2.80
21.60
20.16
15.68
15.68
15.68
5.40
3.92
3.92
3.92
3.92

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
Auditorio
Azotea
CR 04
Sotano
planta 1
CT 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CT 02
Sotano
planta 1
planta 2
planta 3
planta 4
CL 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
CC 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Placa 01
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Sub Total
Area

1.00
1.00

Alto
3.00
1.00

8.00
8.00

3.00
2.80

1.40
1.40

5.00
5.00
5.00
5.00
5.00
5.00
4.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

2.20
2.20
2.20
2.20
2.20
2.20
2.20

2.00
2.00
2.00
2.00
2.00

3.00
2.80
2.80
2.80
2.80

2.20
2.20
2.20
2.20
2.20

3.00
3.00
3.00
3.00
3.00
3.00
2.00

3.00
2.80
2.80
2.80
2.80
3.00
1.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.00
1.00
1.00
1.00
1.00
1.00

3.00
2.80
2.80
2.80
2.80
3.00

1.57
1.57
1.57
1.57
1.57
1.57

2.00
2.00
2.00
2.00
2.00
2.00

12.35
12.35
12.35
12.35
12.35
12.35

3.60
3.40
3.40
3.40
3.40
3.60

1.40
1.40

Sub Total
4.20
1.40
33.60
31.36
33.00
30.80
30.80
30.80
30.80
33.00
8.80
13.20
12.32
12.32
12.32
12.32
18.00
16.80
16.80
16.80
16.80
18.00
4.00
4.71
4.40
4.40
4.40
4.40
4.71

88.92
83.98
83.98
83.98
83.98
88.92

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
Azotea
Placa 01 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 02
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 02 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 03
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 03 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 04

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
1.00

Sub Total
Area

Sub Total

2.00

Long.
12.35

6.00
6.00
6.00
6.00
6.00
6.00
6.00

0.55
0.55
0.55
0.55
0.55
0.55
0.55

3.60
3.40
3.40
3.40
3.40
3.60
1.00

11.88
11.22
11.22
11.22
11.22
11.88
3.30

2.00
2.00
2.00
2.00
2.00
2.00
2.00

5.38
5.38
5.38
5.38
5.38
5.38
5.38

3.60
3.40
3.40
3.40
3.40
3.60
1.00

38.74
36.58
36.58
36.58
36.58
38.74
10.76

4.00
4.00
4.00
4.00
4.00
4.00
4.00

0.55
0.55
0.55
0.55
0.55
0.55
0.55

3.60
3.40
3.40
3.40
3.40
3.60
1.00

7.92
7.48
7.48
7.48
7.48
7.92
2.20

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.67
1.67
1.67
1.67
1.67
1.67
1.67

3.60
3.40
3.40
3.40
3.40
3.60
1.00

12.02
11.36
11.36
11.36
11.36
12.02
3.34

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

1.66
1.56
1.56
1.56
1.56
1.66
0.46

24.70

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 04 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 05
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 05 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 06
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 06 - contrafuerte
Sotano
planta 1

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.60
3.40
3.40
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00
2.00
2.00
2.00

Long.
1.67
1.67
1.67
1.67
1.67
1.67
1.67

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

1.66
1.56
1.56
1.56
1.56
1.66
0.46

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.20
4.20
4.20
4.20
4.20
4.20
4.20

3.60
3.40
3.40
3.40
3.40
3.60
1.00

30.24
28.56
28.56
28.56
28.56
30.24
8.40

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.05
1.05
1.05
1.05
1.05
1.05
1.05

3.60
3.40
3.40
3.40
3.40
3.60
1.00

7.56
7.14
7.14
7.14
7.14
7.56
2.10

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.51
1.51
1.51
1.51
1.51
1.51
1.51

3.60
3.40
3.40
3.40
3.40
3.60
1.00

10.87
10.27
10.27
10.27
10.27
10.87
3.02

2.00
2.00

0.25
0.25

3.60
3.40

1.80
1.70

12.02
11.36
11.36
11.36
11.36
12.02
3.34

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 07
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 07 - contrafuerte
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 08
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 09
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 09 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.40
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00
2.00

Long.
0.25
0.25
0.25
0.25
0.25

2.00
2.00
2.00
2.00
2.00
2.00
2.00

6.45
6.45
6.45
6.45
6.45
6.45
6.45

3.60
3.40
3.40
3.40
3.40
3.60
1.00

46.44
43.86
43.86
43.86
43.86
46.44
12.90

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.29
1.29
1.29
1.29
1.29
1.29
1.29

3.60
3.40
3.40
3.40
3.40
3.60
1.00

9.29
8.77
8.77
8.77
8.77
9.29
2.58

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.23
2.23
2.23
2.23
2.23
2.23
2.23

3.60
3.40
3.40
3.40
3.40
3.60
1.00

16.06
15.16
15.16
15.16
15.16
16.06
4.46

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.10
2.10
2.10
2.10
2.10
2.10
2.10

3.60
3.40
3.40
3.40
3.40
3.60
1.00

15.12
14.28
14.28
14.28
14.28
15.12
4.20

4.00
4.00
4.00
4.00

1.98
1.98
1.98
1.98

3.60
3.40
3.40
3.40

28.51
26.93
26.93
26.93

1.70
1.70
1.70
1.80
0.50

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
planta 4
Auditorio
Azotea
Placa 10
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 10 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 11
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 12
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 13
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.40
3.60
1.00

Sub Total
Area

Sub Total

4.00
4.00
4.00

Long.
1.98
1.98
1.98

2.00
2.00
2.00
2.00
2.00
2.00
2.00

5.35
5.35
5.35
5.35
5.35
5.35
5.35

3.60
3.40
3.40
3.40
3.40
3.60
1.00

38.52
36.38
36.38
36.38
36.38
38.52
10.70

2.00
2.00
2.00
2.00
2.00
2.00
2.00

13.33
13.33
13.33
13.33
13.33
13.33
13.33

3.60
3.40
3.40
3.40
3.40
3.60
1.00

95.98
90.64
90.64
90.64
90.64
95.98
26.66

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.25
4.25
4.25
4.25
4.25
4.25
4.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

30.60
28.90
28.90
28.90
28.90
30.60
8.50

2.00
2.00
2.00
2.00
2.00
2.00
2.00

4.25
4.25
4.25
4.25
4.25
4.25
4.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

30.60
28.90
28.90
28.90
28.90
30.60
8.50

2.00
2.00
2.00
2.00
2.00
2.00

4.43
4.43
4.43
4.43
4.43
4.43

3.60
3.40
3.40
3.40
3.40
3.60

31.90
30.12
30.12
30.12
30.12
31.90

26.93
28.51
7.92

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

Nro.

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO
DESCRIPCIN
Azotea
Placa 13 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 14
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 14 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 15
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 15 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 16

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
1.00

Sub Total
Area

Sub Total

2.00

Long.
4.43

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.25
1.25
1.25
1.25
1.25
1.25
1.25

3.60
3.40
3.40
3.40
3.40
3.60
1.00

9.00
8.50
8.50
8.50
8.50
9.00
2.50

2.00
2.00
2.00
2.00
2.00
2.00
2.00

3.75
3.75
3.75
3.75
3.75
3.75
3.75

3.60
3.40
3.40
3.40
3.40
3.60
1.00

27.00
25.50
25.50
25.50
25.50
27.00
7.50

4.00
4.00
4.00
4.00
4.00
4.00
4.00

3.85
3.85
3.85
3.85
3.85
3.85
3.85

3.60
3.40
3.40
3.40
3.40
3.60
1.00

55.44
52.36
52.36
52.36
52.36
55.44
15.40

8.86

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
Placa 16 - CONTRAFUERTE
Sotano
planta 1
planta 2
planta 3
planta 4
Auditorio
Azotea
VIGAS
FONDO
VP - N 01
VP - N 02
VP - N 03
VP - N 04
VP - N 05
VP - N 06
VP - N 07
VP - N 08
VP - N 09
VP - N 10
VP - N 11
VP - N 12
VP - N 13
VP - N 14
VP - 1 15
VP - 1 16
VP - N 15
VP - N 16
VS - 101 BLOQUE A
VS - 101 BLOQUE B
VS - 102 EJE A-B
VS - 102 EJE C-D
VS - 102 EJE D-E

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
3.60
3.40
3.40
3.40
3.40
3.60
1.00

Sub Total
Area

Sub Total

2.00
2.00
2.00
2.00
2.00
2.00
2.00

Long.
2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

1.75
1.75
1.75
1.75
1.75
1.75
1.75

6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.00
6.00
6.00
6.00
6.00
4.00
4.00
1.00
1.00
4.00
5.00

0.90
9.51
11.35
13.05
16.85
5.65
5.85
5.50
4.92
7.45
3.45
14.46
16.26
16.26
20.36
16.16
16.06
12.76

0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1.62
14.27
17.03
19.58
25.28
8.48
8.78
1.38
7.38
13.41
5.18
21.69
16.26
16.26
5.09
4.04
16.06
15.95

18.00
16.00
2.00
6.00
6.00

7.70
7.75
3.70
4.36
1.69

0.30
0.30
0.25
0.25
0.25

41.58
37.20
1.85
6.54
2.54

3.60
3.40
3.40
3.40
3.40
3.60
1.00

14.40
13.60
13.60
13.60
13.60
14.40
4.00
12.60
11.90
11.90
11.90
11.90
12.60
3.50

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
VS - 102 EJE D-E
VS - 102 EJE E-F
VS - 102 EJE F-G
VS - 102 EJE F-G
VS - 100
VS - 100'
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VIGA BORDE DIRECCION
VIGA BORDE FRENTE
VIGA BORDE FRENTE
VIGA BORDE SOBRE SOTANO
VIGA VORDE VB 02
LATERALES
VP - N 01
VP - N 02
VP - N 03
VP - N 04
VP - N 05
VP - N 06
VP - N 07
VP - N 08
VP - N 09
VP - N 10
VP - N 11
VP - N 12
VP - N 13
VP - N 14
VP - 1 15
VP - 1 16
VP - N 15
VP - N 16
VS - 101 BLOQUE A
VS - 101 BLOQUE B

Und

Nro. Veces

Dimensiones
B
b
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

34.00
41.00
23.00
6.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

Long.
3.75
4.23
4.43
1.80
3.75
2.68
5.65
5.48
5.55
3.40
3.70
3.75
3.75

5.00
5.00
2.00
1.00
1.00

3.50
3.50
6.00
10.20
7.74

0.15
0.15
0.15
0.15
0.20

6.00
6.00
6.00
6.00
6.00
6.00
6.00
1.00
6.00
6.00
6.00
6.00
4.00
4.00
1.00
1.00
4.00
5.00

0.90
9.51
11.35
13.05
16.85
5.65
5.85
5.50
4.92
7.45
3.45
14.46
16.26
16.26
20.36
16.16
16.06
12.76

0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.30
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1.20
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
1.20
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

1.94
11.41
13.62
15.66
20.22
6.78
7.02
1.10
5.90
16.09
4.14
17.35
13.01
13.01
4.07
3.23
12.85
12.76

18.00
16.00

7.70
7.75

0.30
0.30

0.40
0.40

16.63
14.88

31.88
43.36
25.47
2.70
1.88
1.34
2.83
2.74
2.78
1.70
1.85
1.88
1.88
2.63
2.63
1.80
1.53
1.55

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Nro. Veces
2.00
6.00
6.00
34.00
41.00
23.00
6.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

Long.
3.70
4.36
1.69
3.75
4.23
4.43
1.80
3.75
2.68
5.65
5.48
5.55
3.40
3.70
3.75
3.75

VIGA BORDE DIRECCION


VIGA BORDE FRENTE
VIGA BORDE FRENTE
VIGA BORDE SOBRE SOTANO
VIGA VORDE VB 02

5.00
5.00
2.00
1.00
1.00

3.50
3.50
6.00
10.20
7.74

MC 1
MC 2
MC 3
MC 4
MC 5
MC 6
MC 7
MC 8
MC 9
MC 10
MC 11
MC 12
MC 13
MC 14
MC 15
MC 16
MC 17
MC 18

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.00
3.00
1.80
5.65
3.43
5.40
3.92
3.40
4.18
4.23
3.65
3.55
3.60
3.40
5.55
5.48
4.93
6.15

VS - 102 EJE A-B


VS - 102 EJE C-D
VS - 102 EJE D-E
VS - 102 EJE D-E
VS - 102 EJE E-F
VS - 102 EJE F-G
VS - 102 EJE F-G
VS - 100
VS - 100'
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103
VS - 103

Dimensiones
B
b
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.15
0.15
0.15
0.15
0.20

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.40
0.40
0.40
0.40
0.40
0.40
0.40

Sub Total
Area

Sub Total
1.48
5.23
2.03
25.50
34.69
20.38
2.16
1.50
1.07
1.13
1.10
1.11
0.68
0.74
0.75
0.75

0.20
0.20
0.20
0.20
0.20

0.53
0.53
0.36
0.31
0.31

3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20

12.80
9.60
5.76
18.08
10.98
17.28
12.54
10.88
13.38
13.54
11.68
11.36
11.52
10.88
17.76
17.54
15.78
19.68

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.
13.03.00

DESCRIPCIN
PINTURA DE MUROS EXTERIORES C/ LATEX SATINADO - 2
MANOS, C/ IMPRIMANTE
planta 1
EJE A
a
b
c
d
EJE B
a
b
c
EJE G
a
b
c
d
e
EJE 1
a
b
c
d
e
EJE 2
a
b
c
EJE 8
a
b
v4
v5
v11
v12
v19
v22
planta 2
EJE B
a

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

M2

NBTF
6/25/2012
Total
752.44

2.00
2.00
2.00
2.00

5.00
5.48
5.55
3.40

2.80
2.80
2.80
2.80

28.00
30.69
31.08
19.04

1.00
1.00
1.00

5.27
5.40
1.27

2.80
2.80
2.80

14.76
15.12
3.56

1.00
1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92
3.40

2.80
2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98
9.52

2.00
2.00
2.00
2.00
2.00

4.23
4.05
3.70
3.75
3.75

2.80
2.80
2.80
2.80
2.80

23.69
22.68
20.72
21.00
21.00

1.00
1.00
1.00

6.50
2.43
2.43

2.80
2.80
2.80

18.20
6.80
6.80

1.00
1.00

6.60
1.80

2.80
2.80

18.48
5.04

-1.00
-2.00
-2.00
-1.00
-2.00
-1.00

0.55
3.55
2.50
3.00
2.40
1.80

0.80
1.80
1.60
2.80
1.80
1.90

-0.44
-12.78
-8.00
-8.40
-8.64
-3.42

1.00

5.27

2.80

14.76

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
b
c
EJE G
a
b
c
d
EJE 2
a
b
c
EJE 8
a
a'
b
v4
v5
v11
v12
v16
v21
v22
planta 3, 4
EJE B
a
b
c
EJE G
a
b
c
d
EJE 2
a
b
c
EJE 8
a
a'
b

Und

Nro. Veces

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto
2.80
2.80

Sub Total
Area

Sub Total

1.00
1.00

Long.
5.40
1.27

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

15.82
10.22
15.12
10.98

1.00
1.00
1.00

6.50
4.23
2.43

2.80
2.80
2.80

18.20
11.84
6.80

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-1.00
-3.00
-2.00
-1.00
-2.00
-1.00
-1.00

0.55
3.55
2.50
3.00
2.43
3.00
1.80

0.80
1.80
1.60
2.80
2.00
2.40
1.90

-0.44
-19.17
-8.00
-8.40
-9.72
-7.20
-3.42

2.00
2.00
2.00

5.27
5.40
1.27

2.80
2.80
2.80

29.51
30.24
7.11

2.00
2.00
2.00
2.00

5.65
3.65
5.40
3.92

2.80
2.80
2.80
2.80

31.64
20.44
30.24
21.95

2.00
2.00
2.00

6.50
4.23
2.43

2.80
2.80
2.80

36.40
23.69
13.61

2.00
2.00
2.00

5.30
2.10
1.80

2.80
2.80
2.80

29.68
11.76
10.08

15.12
3.56

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN
v4
v5
v11
v12
v16
v21
v22
planta 5
EJE B
a
b
c
EJE G
a
b
c
d
EJE 2
a
b
c
EJE 8
a
a'
b
v5
v8
v15
v17
v18
v20
v22
v24
AZOTEA
Fondo
Frente
Izquierda

Und

Nro. Veces
Long.

Dimensiones
B
b

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

-2.00
-6.00
-4.00
-2.00
-4.00
-2.00
-2.00

0.55
3.55
2.50
3.00
2.43
3.00
1.80

0.80
1.80
1.60
2.80
2.00
2.40
1.90

-0.88
-38.34
-16.00
-16.80
-19.44
-14.40
-6.84

1.00
1.00
1.00

5.27
5.40
1.27

3.20
3.20
3.20

16.86
17.28
4.06

1.00
1.00
1.00
1.00

5.65
3.65
5.40
3.92

2.80
3.20
3.20
3.20

15.82
11.68
17.28
12.54

1.00
1.00
1.00

6.50
4.23
2.43

3.20
3.20
3.20

20.80
13.54
7.78

1.00
1.00
1.00

5.30
2.10
1.80

2.80
2.80
2.80

14.84
5.88
5.04

-1.00
-2.00
-1.00
-1.00
-1.00
-2.00
-1.00
-1.00

3.55
2.50
5.05
5.55
1.35
1.00
1.80
3.00

1.80
2.80
3.00
3.00
3.00
3.20
1.90
3.20

-6.39
-14.00
-15.15
-16.65
-4.05
-6.40
-3.42
-9.60

1.00
1.00
1.00

19.79
23.50
19.30

1.00
1.00
1.00

19.79
23.50
19.30

NBTF
6/25/2012
Total

Observaciones

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

14.00.00

VARIOS

14.01.00

CANALETA DE CEMENTO PULIDO CON IMPERMEABILIZANTE


ANCHO=0.10m.

Und

Long.

Dimensiones
B
b

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

M2

COBERTURA
14.02.00

Nro. Veces

Regin:

14.03.00

ASCENSOR PANORAMICO

UND

14.04.00

CUBICULOS DE SERVICIOS HIGIENICOS


TABIQUES
SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PUERTAS
SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
CUBICULOS PARA DISCAPACITADOS
SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5
PUERTAS
SOTANO
PLANTA 1
PLANTA 2
PLANTA 3
PLANTA 4
PLANTA 5

6/25/2012
Total

Observaciones

17.32
1.00

CANTONERA DE ALUMINIO
Escalera Frente
Escalera Centro
Escalera Fondo

NBTF

21.65

0.80

17.32
487.40

80.00
101.00
101.00

144.00
181.80
161.60

1.80
1.80
1.60

1.00

1.00

M2

1.00
198.30

1.00
4.00
4.00
4.00
4.00
4.00

1.50
1.50
1.50
1.50
1.50
1.50

2.60
2.60
2.60
2.60
2.60
2.60

3.90
15.60
15.60
15.60
15.60
15.60

2.00
5.00
5.00
5.00
5.00
5.00

0.60
0.60
0.60
0.60
0.60
0.60

2.00
2.00
2.00
2.00
2.00
2.00

2.40
6.00
6.00
6.00
6.00
6.00

2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00
2.00

2.60
2.60
2.60
2.60
2.60
2.60

10.40
10.40
10.40
10.40
10.40
10.40

2.00
2.00
2.00
2.00
2.00
2.00

0.90
0.90
0.90
0.90
0.90
0.90

2.00
2.00
2.00
2.00
2.00
2.00

3.60
3.60
3.60
3.60
3.60
3.60

PLANILLA DE METRADOS
OBRA:
ESPECIALIDAD:
PROPIETARIO:

MEJORAMIENTO DE LA CAPACIDAD OPERATIVA DEL ARCHIVO REGIONAL PUNO


ARQUITECTURA
GOBIERNO REGIONAL DE PUNO

Nro.

DESCRIPCIN

Und

Nro. Veces

14.05.00

LIMPIEZA PERMANENTE DE OBRA

M2

18.00

Long.
40.30

14.06.00

LIMPIEZA FINAL DE OBRA

M2

1.00

40.30

15.00.00
15.01.00

SEALIZACION DE SEGURIDAD
DIRECCION DE SALIDA HACIA EL EXTERIOR

UND

6.00

15.02.00

SALIDA CON USO DE ESCALERA

UND

15.03.00

SALIDA HACIA EL EXTERIOR

15.04.00

Dimensiones
B
b
25.10

Regin:

Puno

Hecho:

Prov.:

Puno

Rvdo.:

Distrito:

Puno

Fecha:

Alto

Sub Total
Area

Sub Total

NBTF
6/25/2012
Total

Observaciones

18,207.54

18,207.54

1,011.53

1,011.53

5.00

30.00

30.00

6.00

3.00

18.00

18.00

UND

2.00

2.00

4.00

4.00

BOTIQUIN DE PRIMEROS AUXILIOS

UND

6.00

1.00

6.00

6.00

15.05.00

RIESGO ELECTRICO

UND

6.00

1.00

6.00

6.00

15.06.00

PROHIBIDO FUMAR

UND

6.00

3.00

18.00

18.00

15.07.00

EXTINTOR DE POTASIO

UND

6.00

2.00

12.00

12.00

25.10