Sei sulla pagina 1di 8

Perhitungan Beban A/C

Gedung

Area(m)
Total

Gedung B
Gedung C
Gedung E
Gedung F

Building Load
Building Load

A/C

540 496.8 24.0


3042 1521 26.0
578
416 26.0
352
324 26.0

RH(%)

65
57
61
70

kcal/h

28,485
75,052
19,300
14,938

Lighting
Watt

8,157
###
6,833
5,317

PGN Pusat
Person
No's
sen

kCal/h

0.5
3,506
###
2,937
2,286

25
76
21
16

kcal/hs

51
51
51
51

kcal/hs

###
###
###
830

Latent

kcal/hl

74
74
74
74

kcal/hl

1,840
5,630
1,540
1,200

Other
Equipment

Daya

T Load

Load/m

Terpasang % load exist

Watt

kCal/h

kcal/h

kcal/hm2

watt

1,555
4,761
1,303
1,014

668
###
560
436

59,616
121,680
31,759
24,612

120
80
76
76

56,046
66,218
17,190
14,070

itung

Watt/m2

58%
99%
100%
95%

113

65

44

43

41

41

43

41

Perhitungan Beban A/C


Lantai

Building Load
Building Load

Area(m)
Total

A/C

1037
1037
1037

909 25.0
909 25.0
909 25.0

1037

909 25.0

13:30
12:00
11:00
9:00

1037
1037
1037
1037

909
909
909
909

Lantai-3
13:30
12:00

Lantai-1
13:30
12:00
11:00
9:00

RH(%)

62

Lighting

PGN Pusat Gedung A


Person
No's
sen

kCal/h

###
###
###

0.5
6,924
6,924
6,924

45
45
45

###

###

6,924

kcal/h

###
###
###

Watt

kcal/hs

Latent

Other
Equipment

Daya

T Load

Load/m

Terpasang

kcal/hm2

pk

% load

kcal/hs

kcal/hl

kcal/hl

Watt

kCal/h

kcal/h

51
51
51

2,320
2,320
2,320

74
74
74

3,370
3,370
3,370

2,845
2,845
2,845

###
###
###

69,405
64,326
51,163

76
71
56

46
46
46

96%
89%
71%

45

51

2,320

74

3,370

2,845

###

43,429

48

46

60%

76
71
56
47

46
46
46
46

96%
89%
70%
60%

Lantai-2
25.0
25.0
25.0
25.0

65

###
###
###
###

###
###
###
###

6,533
6,533
6,533
6,533

45
45
45
45

51
51
51
51

2,320
2,320
2,320
2,320

74
74
74
74

3,370
3,370
3,370
3,370

2,845
2,845
2,845
2,845

###
###
###
###

69,405
64,326
50,626
42,892

878
878

812 25.0
812 25.0

62

###
###

###
###

6,786
6,786

41
41

51
51

2,080
2,080

74
74

3,010
3,010

2,542
2,542

###
###

103,936
96,628

128
119

60
60

111%
103%

11:00
9:00

878
878

812 25.0
812 25.0

###
###

###
###

6,786
6,786

41
41

51
51

2,080
2,080

74
74

3,010
3,010

2,542
2,542

###
###

91,350
68,448

113
84

60
60

97%
73%

Lantai-4
13:30
12:00
11:00

878
878
878

812 25.0
812 25.0
812 25.0

###
###
###

###
###
###

7,620
7,620
7,620

42
42
42

51
51
51

2,150
2,150
2,150

74
74
74

3,110
3,110
3,110

2,542
2,542
2,542

###
###
###

113,680
105,560
98,117

140
130
121

66
66
66

110%
102%
95%

878

812 25.0

###

###

7,620

42

51

2,150

74

3,110

2,542

###

68,978

85

66

67%

9:00

59

Perhitungan Beban A/C


Lantai

Building Load
Building Load

Area(m)

kCal/h

###

0.5
6,924

45

###

###

6,533

62

###

###

59

###

###

Total

A/C

Lantai-1
13:30

1037

909 25.0

62

###

Lantai-2
13:30

1037

909 25.0

65

Lantai-3
13:30

878

812 25.0

878

812 25.0

Lighting

PGN Pusat Gedung A


Person
No's
sen

RH(%)

kcal/h

Watt

kcal/hs

Latent

Other
Equipment

Daya

T Load

Load/m

Terpasang

kcal/hm2

pk

Intensitas Watt/m

% load

itung

pasang

ukur

kcal/hs

kcal/hl

kcal/hl

Watt

kCal/h

kcal/h

51

2,320

74

3,370

2,845

###

69,405

76

46

96%

41

38

40

45

51

2,320

74

3,370

2,845

###

69,405

76

46

96%

41

38

40

6,786

41

51

2,080

74

3,010

2,542

###

72,701

90

60

77%

48

55

40

7,620

42

51

2,150

74

3,110

2,542

###

88,792

109

66

86%

59

61

Lantai-4
13:30

40

Perhitungan Beban A/C


Ruangan

Area(m)

Building Load
Building Load

PGN Cabang Cirebon


Person
Lighting
No's
sen

Daya

T Load

Load/m

Terpasang

kcal/h

kcal/hm2

PK

% load

kcal/hs

kcal/hl

kcal/hl

51

60

74

80

225

97

4,369

61

1.5

186%

51

110

74

150

100

43

1,981

62

1.5

84%

452

51

260

74

370

200

86

3,766

59

1.5

161%

296

127

51

210

74

300

56

24

1,857

103

1.5

79%

2,814

591

254

51

60

74

80

113

48

3,923

109

1.5

167%

67

###

2,988

1,285

51

310

74

450

570

245

94

4.0

274%

27

65

1,222

296

127

51

60

74

80

12

26

64

726

197

85

51

110

74

150

40

40

28

63

3,710

657

282

51

310

74

54

54

28

67

4,226

887

381

51

160

28

65

580

148

64

51

45

45

28

64

3,192

739

318

28

67

700

148

64

28

63

700

148

16

16

28

65

1,520

15

15

28

67

1,261

Total

A/C

72

72

28

32

32

64

RH

kcal/h

Watt

65

4,694

1,182

0.5
508

28

64

1,938

525

226

64

28

67

3,520

1,051

18

18

26

67

880

36

36

26

64

182

182

26

18

18

12

Show room

kCal/h

kcal/hs

Other
Equipment

Latent

Watt

kCal/h

Penjualan Industri
Staf Akuntansi/keuangan
Penjualan Rumah Tangga
Kepala Cabang (A)
Kabag DTT dan ADM (A)
###

Foto Copy
-

1,495

83

1.5

64%

38

16

1,310

109

1.5

56%

450

125

54

3,860

97

1.0

247%

74

230

169

73

4,072

75

2.0

130%

110

74

150

28

12

736

82

1.0

47%

51

410

74

600

141

61

3,679

82

2.0

118%

51

60

74

80

28

12

736

82

1.0

47%

64

51

60

74

80

28

12

736

82

1.0

47%

263

113

51

60

74

80

50

22

1,441

90

1.0

92%

246

106

51

60

74

80

47

20

1,226

82

1.0

78%

Ka Subbag TU (A)
Sekretariat
Pertemuan
Pimpro
Staf Teknik (A)
Ka Subbag DTR (A)
Ka Subbag DTT (A)
Kantor Gudang PE
Ka Subbag Pemeliharaan

Perhitungan Beban A/C


Ruangan

Building Load
Building Load

Area(m)
Total

A/C

RH(%)

kcal/h

PGN Cabang Cirebon


Person
Lighting
No's
sen
Watt

kCal/h

Other
Equipment

Latent
kcal/hl

existing

Daya

T Load

Load/m

Terpasang

kcal/h

kcal/hm2

PK

% load

kcal/hs

kcal/hs

51

60

74

80

188

81

2,299

38

1.5

98%

22.5

kcal/hl

Watt

kCal/h

watt/m

Show room

60

60

28

65

2,218

985

0.5
423

Penjualan Industri

32

32

27

52

1,644

525

226

51

110

74

150

100

43

2,182

68

1.5

93%

42.1

Staf Akuntansi/keuangan

64

64

28

67

1,746

795

342

51

260

74

370

200

86

2,252

35

1.5

96%

21.1

Penjualan Rumah Tangga

18

18

26

52

880

296

127

51

210

74

300

56

24

1,857

103

1.5

79%

74.9

Kepala Cabang (A)

36

36

26

53

DTT dan ADM (A)

145

145

27

58

51

310

74

450

454

195

6,827

47

4.5

97%

27.9

Foto Copy (A)

18

18

29

60

Ka Subbag TU (A)

12

12

26

55

726

197

85

51

110

74

150

38

16

1,310

109

1.5

56%

112.3

Sekretariat (A)

40

40

29

63

2,681

657

282

51

310

74

450

125

54

2,276

57

1.5

97%

33.7

Pertemuan (A)

54

54

28

67

26

65

580

148

64

51

110

74

150

28

12

1,104

123

1.0

71%

99.9

45

45

28

64

2,467

739

318

51

410

74

600

141

61

3,097

69

2.0

99%

39.9

Ka Subbag DTR (A)

26

67

700

148

64

51

60

74

80

28

12

1,104

123

1.0

71%

99.9

Ka Subbag DTT (A)

26

63

700

148

64

51

60

74

80

28

12

1,104

123

1.0

71%

99.9

Kantor Gudang PE

16

16

28

65

1,520

263

113

51

60

74

80

50

22

1,441

90

1.0

92%

56.2

Ka Subbag Pemeliharaan

15

15

28

67

1,261

246

106

51

60

74

80

47

20

1,226

82

1.0

78%

59.9

Inten A
Inten T

60.78
82.81
65.46

Pimpro (A)
Staf Teknik (A)

A
T

209
582

Tidak diopersikan
5,195

1,511

649

Tidak diopersikan

0.0

Tidak diopersikan

36%

Inten B

37.69

Perhitungan Beban A/C


Gedung

Building Load
Building Load

Area(m)
Total

A/C

RH(%)

PGN Cabang Surabaya


Person
Lighting
No's
sen

kcal/h

Watt

kCal/h

Latent

kcal/hs

kcal/hs

kcal/hl

kcal/hl

Other
Equipment
Watt

kCal/h

Daya

T Load
kcal/h

Intensitas Terpasang
kcal/hm2

PK

% load existing

Utama

671

636

26

47

###

###

0.5
4,456

38

51

1,940

74

###

### ###

###

110

43.0

98%

60.8

Dinas operasi

462

300

27

47

###

5,289

2,273

25

51

1,280

74

###

###

806

###

71

13.0

99%

38.9

Dinas Teknik

526

452

27

43

###

7,502

3,225

30

51

1,530

74

###

###

757

###

68

19.0

97%

37.8

Logistik & Koperas 122

122

27

49

4,542

2,106

905

10

51

510

74

740

###

567

60

4.5

98%

33.0

watt/m

7,294