Sei sulla pagina 1di 7

(NTPC) / (TSTPP)

4X500 MW UNITS , Stage- II


AREA : Turbine

Unit - 3
Description

1.

LUB OIL
PR.V.LOW Behind
the Filter

3.

5.

7.

P&I

HP outer casing
Exhaust Steam
temp HI .

COND. PR.
VACUUM TRIP
(VSP)

Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

TS - II /OPN/R/P&I/TG/01

PROTECTION & INTERLOCKS CHECKING PROTOCOL

Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

So
No

AXIAL SHIFT
VERY
HIGH

OPERATION DEPARTMENT

Logic

2/3

2/3

Set. Pt.

Field Switches

Method of
Checking

Channel
acting

CRT
Trip
Status

<1.2Kg/Cm2

MAV 42 CP 016
MAV 42 CP 017
MAV 42 CP 018

By draining the
pr. switches in
combination

Ch- 1

MAD 11 CY 011
MAD 12 CY 011
MAD 13 CY 011
(0-50%-100%)

Simulation
DONE FROM
THE Panel.
16% &84%

1.0 mm

500 0C
2/3

2/3

Date Of Checking : 03-01-2006

(0-600 0C)

As per the
curve

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

Simulation
DONE FROM
THE Panel.
(84% )

MAA 50 CT 021
MAA 50 CT 022
MAA 50 CT 023
- MAC 11 CP 001
+ MAG 10 CP 002
- MAC 11 CP 002
+ MAG 10 CP 003
- MAC 11 CP 003
+ MAG 10 CP 004
P&I

Speed signal &


LPT inlet pr.
Simulation in
Panel

Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 1 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

Unit - 3
So
No

9.

11.

13.

P&I

Logic

COND. PR.
VACUUM TRIP
(FSP)

2/3

HP CASING TOPBOT Diff temp


Very high

IP CASING TOPBOTTOM Diff


temp Very high
(FRONT)

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

TS - II /OPN/R/P&I/TG/01

PROTECTION & INTERLOCKS CHECKING PROTOCOL

Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

Description

Checked By

OPERATION DEPARTMENT

2/3

2/3

Set. Pt.

Field Switches

Method of
Checking

> - 0.70
KSC &
turbine speed
> 6.67% of
3600 RPM

MAG 10 CP 002
MAG 10 CP 003
MAG 10 CP 004

Speed
simulation in
Panel. & Vac sim
30 %

MAA 50 CT 051 A/B (Top)


MAA 50 CT 052 A/B (Bot)
MAA 50 CT 053 A/B (Top)
MAA 50 CT 054 A/B (Bot)
MAA 50 CT 055 A/B (Top)
MAA 50 CT 056 A/B (Bot)

By simulation
from Panel
both Load &
Temp points

> 100 0 C
&
actual load
> 100 mw
(16.67% of
600MW )
> 45 0 C
&
actual load
> 45 mw
(7.5% of
600MW )

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

MAB 50 CT 041 A/B (Top)


MAB 50 CT 042 A/B (Bot)
MAB 50 CT 043 A/B (Top)
MAB 50 CT 044 A/B (Bot)

P&I

Date Of Checking : 03-01-2006


Channel
acting

CRT
Trip
Status

Ch- 1

LVS
alarm

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Simulation in
Panel

Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

SOE Point
in THL
CRT

BHEL
CRT

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 2 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

Unit - 3
So
No

15.

18.

TS - II /OPN/R/P&I/TG/01

PROTECTION & INTERLOCKS CHECKING PROTOCOL

Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

Description

IP CASING TOPBOTTOM Diff


temp Very high
(REAR)

FIRE PROT'N
CHECK 1 & 2

OPERATION DEPARTMENT

Method of
Checking

Logic

Set. Pt.

Field Switches

2/3

> 45 0 C
&
actual load
> 45 mw
(7.5% of
600MW )

MAB 50 CT 061 A/B (Top)


MAB 50 CT 062 A/B (Bot)
MAB 50 CT 063 A/B (Top)
MAB 50 CT 064 A/B (Bot)

2/3

1050 MM
MOT level
(0-1600mm)
From Top

MAV10CL021
MAV10CL022
MAV10CL023
FP PB AT LOCAL

Date Of Checking : 03-01-2006


Channel
acting

CRT
Trip
Status

Ch- 1

Simulation in
Panel

By Simulating
the level & also
by pressing the
push button.

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 2

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

GENERATOR MECHANICAL PROTECTIONS ( Sl no 10-19)

20. LIQUID MAIN


LEADS TOP

P&I

Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

2/3

Level >
MAX

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

By simulating
the level
switches from
local.

MKA 24 CL 001
MKA 24 CL 011
MKA 24 CL 021

P&I

Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 3 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOL

Unit - 3
So
No

Description

Logic

HOT AIR MAIN


24. EXCITER V.
HIGH

2/3

2/3

Set. Pt.

> 55

> 80

COLD GAS AFT


25.
CLR A/B V. HIGH

2/3

> 60

COLD GAS AFT


27.
CLR C/D V. HIGH

2/3

> 60

Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

SO TEMP AFT
CLR AIR SIDE V.
22.
HIGH

P&I

TS - II /OPN/R/P&I/TG/01

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

Method of
Checking

Field Switches

MKC 09 CT 001
MKC 09 CT 004
MKC 09 CT 005

MKA 78 CT 001
MKA 78 CT 002 A
MKA 78 CT 003 A

P&I

Channel
acting

CRT
Trip
Status

Ch- 1

By Simulating
the temp.
switches.

MKW 71 CT 001
MKW 71 CT 004
MKW 71 CT 005

MKA 75 CT 001
MKA 75 CT 002A
MKA 75 CT 003A

Date Of Checking : 03-01-2006

By Simulating
the temp.
Switches.
By Simulating
the temp. RTDs
AT LOCAL

By Simulating
the temp. RTDs.

Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 2

Ch- 1

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 4 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

OPERATION DEPARTMENT
PROTECTION & INTERLOCKS CHECKING PROTOCOL

Unit - 3
So
No

Description

Logic

PRIM WATER
TEMP. AFT CLR
V. HIGH

37.
P&I

2/3

2/3

2/3

2/3
Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

Set. Pt.
< 70 %

2/3

FLOW MAIN
33. BUSH 'R' V. LOW

FLOW MAIN
BUSH 'S' V.
35.
LOW

Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

STATOR WNDG.
29. FLOW V. LOW

31.

TS - II /OPN/R/P&I/TG/01

<48 M3/hr

> 55

Field Switches

Method of
Checking

Channel
acting

CRT
Trip
Status

MKF 82 CF 001 A
MKF 82 CF 001 B
MKF 82 CF 001 C

by reducing the
the actual flow

Ch- 1

MKF 80 CT 001
MKF 80 CT 005
MKF 80 CT 006

By Simulating
the temp.
Switches AT
LOCAL

< 73.88 %
<1.33
M3/hr

MKF 83 CF 001 A
MKF 83 CF 001 B
MKF 83 CF 001 C

< 73.88 %
<1.33
M3/hr

MKF 83 CF 011 A
MKF 83 CF 011 B
MKF 83 CF 011 C

< 73.88 %

MKF 83 CF 021 A

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

Date Of Checking : 03-01-2006

P&I

By draining the
flow switches in
combination &
also by reducing
the flow.
By draining the
flow switches in
combination &
also by reducing
the flow.
By draining the
flow switches in
Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 5 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

Unit - 3
So
No

Description

Logic

GEN
39.
PROTECTION

43.

MFT

1/3

ELECTRICAL
OVERSPEED

Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

PROTECTION & INTERLOCKS CHECKING PROTOCOL

Set. Pt.
<1.33
M3/hr

2/3

2/3

45. EMERGENCY
TRIP FROM THE
P&I

TS - II /OPN/R/P&I/TG/01
Rev 0.0 (01/01/2006)

EQUIPMENT NAME : MAIN TURBINE

FLOW MAIN
BUSH 'T' V. LOW

41.

OPERATION DEPARTMENT

2/3

Relay
186/286
GROUP
Operated
MFT took
place

3270 RPM
(109%)

Both PB
pressed
Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

Date Of Checking : 03-01-2006

Method of
Checking

Channel
acting

CRT
Trip
Status

MKF 83 CF 021 B
MKF 83 CF 021 C

combination &
also by reducing
the flow.

Ch- 2

MKY 01 EZ 000 A X 401


MKY 01 EZ 000 B X 401
MKY 01 EZ 000 C X 401

By simulating the
concant in GRP.

From FSSS

Checked by
actually tripping
the boiler.

Field Switches

Speed signal
simulation

Speed transmitters

PB from TG desk

P&I

By pressing
both push
Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Ch- 2

Ch- 1

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 6 of 7

(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
AREA : Turbine

Unit - 3
So
No

PROTECTION & INTERLOCKS CHECKING PROTOCOL

Description

Logic

EMERGENCY TRIP
from Vertical Panel
in CCR

Set. Pt.

simultaneou
sly
Trip from
Vertical
2/3
Panel
Console

Field Switches

Rev 0.0 (01/01/2006)


Date Of Checking : 03-01-2006

Method of
Checking

Channel
acting

CRT
Trip
Status

buttons
simultaneously

Ch- 2

PB in Vertical Panel

1/1

Pressed

Local Trip PB

By operating the
trip lever in main
trip device.

Emergency Trip
from VPC

1/1

Pressed
from CRT

CRT VPC

By pressing from
CRT

SOE Point
in THL
CRT

BHEL
CRT

LVS
alarm

Ch- 1

Ch- 2

Mech
Trip

Both
Channel

By pressing the
push button in
vertical panel.

MANUAL TRIP
49. from Local
protection Rack
50.

TS - II /OPN/R/P&I/TG/01

EQUIPMENT NAME : MAIN TURBINE

PB PROVIDED IN
TG DESK (both)
47.

OPERATION DEPARTMENT

N:B :- After checking all the simulations are normalized by C&I .


The interlocks are checked by observibg opeartion of TTR Ch- 1 Ch- 2 . Only once the actual
operation of SV is checked in each channel .

P&I

Checked By

Signature:
Name: R.N.Das
Desig: Sr. Supdt (O)

Approved By

D.Sarkar
DGM (O)
(Operation Dept.)

P&I

Checked By

Signature:
Name: A. Bhowmic
Desig: Supdt (C&I)

Approved By

( C&I Dept.)

A.N.Sar
DGM(C&I)

Page 7 of 7

Potrebbero piacerti anche