Sei sulla pagina 1di 2

Liquid Transfer Pump Project

Project team plan to install new centrifugal pump on the downstream of


separator unit due to higher pressure requirement at the downstream processing
unit.
Pump specification
Tag No.
Service
Capacity
Diff.
Press
Driver

G-1000
Liquid pumps
200 GPM
400 psi
200 HP 2000
RPM

A spool modification is required to install the pump system. Pump will be placed
between chemical injection point and sampling connection (SC-1415).
Pump will be operated automatically based on the liquid level inside the
separator. Project team decided to modify existing transmitter connected to LV1405 and convert as the liquid level input for the pump operation. LV-1405 will
be removed and replaced with a 1 manual gate valve and tagged with a lock
open to ensure no blockage for the pump during operation.
The pump will be operated on a liquid level range set between Level Switch Low
(LSL) and Level Switch High (LSH). It means the pump will automatically on if the
liquid level already reach LSH number and will automatically turned off if the
liquid level reach LSL number. For system protection, Level Switch Low Low
(LSLL) and Level Switch High High (LSHH) set at a certain number to trigger
process shutdown type A. Actual liquid level, LSL, LSH, LSLL, and LSLL reading is
shown on the DCS panel.
Additional Pressure indicator and transmitter (with tag no 1400) installed on the
pump discharge for process monitoring form DCS panel. It also equipped with
Pressure Switch High (PSH) and Pressure Switch Low (PSH) that will automatically
shutdown the pump if the operating pressure not within the range of PSL and
PSH.
For piping related modification, since the pump had a 1 suction and 2
discharge, a reducer need to be installed so the pump can fit with existing pipe
size. A check valve also installed at the downstream of pressure indicator to
ensure no back flow to the pump system.
You are assigned to modify existing P&ID (named P&ID production separator)
based on the description above. Symbol database file also provided as reference
for drawing modification. In case no additional detail information available from
the description above, some assumption can be made and put on a note section.

Note: For helping the review process, the revised item or added item need to be
put inside clouded area and since not all project team have an access to
autocad, the modified P&ID need to be exported to pdf file

Potrebbero piacerti anche