Sei sulla pagina 1di 2

CONSTRUCTORA SURUPANA S.A.C.

OBRA: Rehabilitacion y Mejoramiento de la Carretera Yauri - Negromayo - Imata, Tramo Imata - Osocollo - Negromayo
Oficina Principal: AV. CIRCUNVALACION N 587 JULIACA - PUNO
Area: Division de Equipos

RESUMEN DE VALORIZACIN N - 2015


CONTRATO N:
DEL
AL
CONTRATISTA
D.N.I.
UNIDAD
UBICACIN

:
:
:
:
:
:

11 de October de 2015
30 de October de 2015

PAVIMENTADORA VOGELE

MONTO A VALORIZAR
DESCRIPCION
PAVIMENTADORA VOGELE

UND.
HR

TOTAL VALORIZADO

S/.
170.00

S/.

CANTIDAD SUBTOTAL
75.00
12750.00
75.00

12750.00

IGV
2295.00
-

TOTAL
15,045.00
-

2295.00

15,045.00

DESCUENTOS
MATERIALES
CONSUMO DE COMBUSTIBLE
GRASA

UND

S/.

CANTIDAD

GLN
Kg

SUBTOTAL

###

###
###

IGV

SUBTOTAL
-

TALLERES

ALIMENTACION/ALOJAMIENTO
ALIMENTACION

UND
0

S/.

UND

S/.

CANTIDAD
-

SUBTOTAL

CANTIDAD
###

SUBTOTAL
-

IGV

SUBTOTAL
-

IGV

SUBTOTAL
-

SIN IGV
TOTAL A DESCONTAR

CON IGV
-

ADELANTOS
CONCEPTO

UND

S/.

G.ADMINIST.

SUBTOTAL
-

TOTAL DE ADELANTOS

RESUMEN
TOTAL VALORIZADO

S/.

DESCUENTOS Y ADELANTOS

S/.

15,045.00
-

S/.
NETO A PAGAR

IGV

S/.

12750.00

2295.00

TOTAL

AREA DE EQUIPOS

AREA DE CONTROL

15,045.00

15,045.00

RESIDENCIA DE OBRA

CONSTRUCTORA SURUPANA S.A.C.


OBRA: Rehabilitacion y Mejoramiento de la Carretera Yauri - Negromayo - Imata, Tramo Imata - Osocollo - Negromayo
Oficina Principal: AV. CIRCUNVALACION N 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS (OCTUBRE 2015)


EQUIPO
N SERIE
FECHA
11/1/2015
11/2/2015
11/3/2015
11/4/2015
11/5/2015
11/6/2015
11/7/2015
11/8/2015
11/9/2015
11/10/2015
11/11/2015
11/12/2015
11/13/2015
11/14/2015
11/15/2015
11/16/2015
11/17/2015
11/18/2015
11/19/2015
11/20/2015
11/21/2015
11/22/2015
11/23/2015
11/24/2015
11/25/2015
11/26/2015
11/27/2015
11/28/2015
11/29/2015
11/30/2015
12/1/2015

PAVIMENTADORA VOGELE
08831093
Hr. In

Hr. Fn
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8831-093

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Operador:
Diferencia

Arran. Ini.

Mantto.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

F.Frente

Lluvia

Dias
Trabajados

Traslado Fren.

0.00

0.00

0.00

0.00

Total

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
5.00
5.00
5.00
5.00
0.00
0.00
5.00
5.00
5.00
5.00
5.00
0.00
0.00
5.00
5.00
5.00
5.00
5.00
0.00

INICIO DE TRABAJOS (05/11/2015

0.00

Hrs. Trab

0.00

75.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0

75.00

Hrs
OBSERVACION
Previstas
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0
0.0
5.0
5.0
5.0
5.0
5.0
0.0

75.00

0.00 Gln