1. ACTIVIDADES PRELIMINARES
1.4.
VALOR SUB-TOTAL
$ 0.00
Ha
34.85
$ 480,113.64
$ 16,731,960.23
Km
31.60
$ 562,338.54
$ 17,769,897.92
$ 0.00
2. MOVIMIENTO DE TIERRAS
$ 0.00
2.1.
210
m3
50,000.00
$ 2,875.00
$ 143,750,000.00
2.2.
210
m3
28,353.20
$ 3,437.50
$ 97,464,125.00
6.2
320
$ 0.00
3. PAVIMENTACIN
$ 0.00
m3
9,000.00
$ 26,453.13
$ 238,078,125.00
m3
12,000.00
$ 360,305.52
$ 4,323,666,250.00
SUBTOTAL PAVIMENTACIN
$ 0.00
4. BOX CULVERT
$ 0.00
3.9.
630
m3
27.00
$ 408,976.32
$ 11,042,360.63
4.1.
630
m3
33.00
$ 469,613.04
$ 15,497,230.26
3.15.
640
Kg
654.00
$ 3,445.00
$ 2,253,030.00
3.16.
640
Kg
2,460.00
$ 3,751.25
$ 9,228,075.00
3.2.
600
Volumen de excavacin
m3
43.00
$ 17,227.81
$ 740,795.94
3.20.
610
m3
60.00
$ 7,531.77
$ 451,906.25
VALOR TOTAL
$ 34,501,858.14
$ 241,214,125.00
$ 4,561,744,375.00
$ 39,213,398.07
5. SEALIZACIN Y DEMARCACIN
$ 0.00
3.4.
700
ml
94,808.00
$ 756.25
$ 71,698,550.00
3.2.
710
Un
259.00
$ 236,350.00
$ 61,214,650.00
3.1.
710
Un
20.00
$ 236,350.00
$ 4,727,000.00
3.3.
710
Un
2.00
$ 377,000.00
$ 754,000.00
3.8.
720
Postes de Kilometraje
Un
32.00
$ 49,386.88
$ 1,580,380.30
Un
1.00
$ 4,000,000.00
$ 4,000,000.00
$ 0.00
$ 5,020,648,336.52
30%
$ 1,506,194,500.96
$ 6,526,842,837.47
$ 143,974,580.30
7.00%
$ 351,445,383.56
$ 6,878,288,221.03
EQUIPO
TARIFA / HORA
$ 45,000
Volqueta
$ 25,000
Bulldozer D-6
$ 55,000
Compresor
$ 38,000
Volqueta
$ 25,000
Cargador
$ 45,000
Vibrocompactador
$ 43,000
Motoniveladora
$ 50,000
Carrotanque
$ 25,000
Motobomba
$ 7,500
Mezcladora
$ 8,000
Vibrador de concreto
$ 6,000
$ 60,000
Cilindro
$ 50,000
CilindroNeumtico
$ 55,000
Irrigador
$ 35,000
Equipo de topografia
$ 12,500
Equipo de soldadura
$ 6,000
Pulvimezcladora
Rana vibratoria
$ 40,000
$ 6,500
F13
F14
F15
F16
F17
F18
F19
F20
F21
F22
F23
F24
F25
F26
F27
F28
F29
F30
F31
PERSONAL
JORNAL
Machinero
$ 25,000
Ayudante
$ 12,500
Oficial
$ 15,000
Topografo
$ 65,000
Cadeneroa
$ 30,000
Trochero
$ 12,500
Soldador
$ 40,000
Obrero
$ 12,500
G12
G13
G14
G15
G16
G17
G18
G19
G20
G21
G22
G23
DESCRIPCION
UNIDAD
PRECIO
Repisa
Ml
3500.00
Sacos de lona
Un
$ 750
Un
$ 301,600
Seal preventiva
Un
$ 189,080
Seal reglamentaria
Un
$ 189,080
Tabla burra
Ml
$ 2,500
Un
$ 8,800
Ml
$ 43,000
Tierra negra
$ 22,000
Ml
$ 160,000
ML
$ 8,500
ML
$ 12,000
ML
$ 16,500
Ml
$ 17,800
Ml
$ 9,000
F106
F107
F108
F109
F110
F111
F112
F121
F122
F123
F124
F125
F126
F127
F128
1. PRELIMINARES
1.1 DESMONTE Y LIMPIEZA DE RASTROJO
1.2. DESMONTE Y LIMPIEZA EN MONTAA
1.3. DESCAPOTE Y LIMPIEZA
1.4 LOCALIZACION Y REPLANTEO TOPOGRAFICO
$ 480,113.64
$ 675,000.00
$ 3,125.00
$ 562,338.54
2. EXPLANACIONES
2.1 EXCAVACIONES DE CORTES, CANALES Y PRESTAMOS EN MATERIAL
$ 2,875.00
$ 3,437.50
$ 16,988.28
$ 7,833.33
$ 1,125.00
3. OBRAS DE DRENAJE
3.1 EXCAVACION MANUAL EN MATERIAL COMUN
3.2 EXCAVACION MANUAL EN CONGLOMERADO
3.3 EXCAVACION EN ROCA CON COMPRESOR Y DINAMITA
3.4 EXCAVACION MANUAL HUMEDA
3.5 CONCRETO DE 2000 P.S.I. PARA SOLADOS Y ATRAQUES
3.6 CONCRETO CICLOPEO DE 2500 P.S.I., 40% RAJON PARA BASES
3.7 CONCRETO CICLOPEO DE 2500 P.S.I., 40% RAJON PARA ELEVACIONES
3.8 CONCRETO SIMPLE DE 2500 P.S.I. PARA BASES
3.9 CONCRETO SIMPLE DE 3000 P.S.I. PARA BASES
3.10 CONCRETO SIMPLE DE 2500 P.S.I. PARA ELEVACIONES
3.11 CONCRETO SIMPLE DE 3000 P.S.I. PARA ELEVACIONES, H<3.0 Mts.
3.12 CONCRETO SIMPLE DE 3000 P.S.I. PARA ELEVACIONES, H>3.0 Mts.
3.13 SUMINISTRO E INSTALACION DE TUBERIA DE CONCRETO D=24",
3.14 SUMINISTRO E INSTALACION DE TUBERIA DE CONCRETO REFORZADO
$ 12,250.00
$ 17,227.81
$ 28,628.90
$ 24,687.50
$ 280,774.65
$ 271,269.23
$ 341,556.34
$ 385,595.21
$ 408,976.32
$ 446,490.39
$ 461,263.43
$ 506,263.43
$ 89,328.13
$ 244,449.22
$ 3,445.00
$ 3,751.25
$ 82,734.38
$ 1,148.44
$ 543.48
$ 7,531.77
COMPACTADO MECANICAMENTE
$ 64,364.06
$ 29,068.23
$ 327,157.14
$ 2,379.30
$ 21,746.09
4. PUENTES
4.1 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 0 A 7.0 Mts.
$ 469,613.04
4.2 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 7,1 A 14.0 Mts.
4.3 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 14,1 A 21.0 Mts.
4.4 CONCRETO DE 3000 P.S.I PARA BARANDAS, INCLUYE REFUERZO , SEGUN MODELO
$ 494,349.88
$ 533,861.60
$ 1,270,844.93
$ 89,576.56
$ 172,939.38
$ 173,938.13
$ 11,824.22
$ 58,125.00
$ 361,739.11
5. AFIRMADO
5.1 SUMINISTRO Y EXTENDIDA MATERIAL SELECCIONADO PARA AFIRMADO, SIN
COMPACTAR**
5.2 SUMINISTRO, EXTENDIDA Y COMPACTACION MECANICA DE MATERIAL SELECCIONADO
PARA AFIRMADO **
6. PAVIMENTACIN
6.1 ESCARIFICACION, CUNETEO, RENIVELACION Y COMPACTACION DE LA BANCA EXISTENTE. (TRABAJO PREVIO A PAVIMENTACI
6.2 SUMINISTRO, EXTENDIDA Y COMPACTACION DE MATERIAL SELECCIONADO PARA SUB-BASE
6.3 SUMINISTRO, EXTENDIDO Y COMPACTACION DE MATERIAL SELECCIONADO PARA BASE
6.4 CONCRETO PARA PAVIMENTO RIGIDO 3500 PSI, INCLUYENDO JUNTAS DE ASFALTO LIQUIDO
6.5 SUMINISTRO, CORTE E INSTALACION DE ACERO DE TRANSFERENCIA PDR-60
6.6. IMPRIMACION
6.7. CONSTRUCCION DE CARPETA ASFALTICA EN CALIENTE , INCLUYE BARRIDO, SUMINISTRO Y COMPACTACION ,
PARA PROVINCIAS 1,2,3,4,6,9,10,11,12),
6.8. ESTABILIZACIN DE SUBRASANTE (REDUCCIN DE PLASTICIDAD CON ARENA)
6.9. PARCHEO. BARRIDO Y SOPLADO
6.10 PARCHEO.
RIEGO DE LIGA
7. SARDINELES Y ANDENES
7.1 CONSTRUCCION DE SARDINELES EN CONCRETO DE 2500 PSI INCLUYE JUNTA DE MADERA
7.2 CONSTRUCCION DE BERMA CUNETAS EN CONCRETO DE 2500 PSI INCLUYE JUNTA DE
MADERA
9. SEALIZACION Y DEMARCACIN
9.1. SUMINISTRO E INSTALACION SEAL VIAL REGLAMENTARIA, DIAMETRO 75 cm. SEGUN NORMA INVIAS
9.2 SUMINISTRO E INSTALACION SEAL VIAL PREVENTIVA, TAMAO 75*75 cm. SEGUN NORMA INVIAS
9.3 SUMINISTRO E INSTALACION SEAL VIAL INFORMATIVA, TAMAO 2m x 50 cm CON SOPORTE H SEGN INVIAS.
9.4. DEMARCACIN HORIZONTAL. SUMINISTRO Y APLICACION DE PINTURA ACRILICA CON MICROESFERAS
MARCA GRIPSA.REF. GRSF, CON TRATAMIENTO DE ADHESION Y FLOTABILIDAD
70-30 PARA LINEAS CONTINUAS Y DISCONTINUAS COLOR AMARILLO SOL Y BLANCO NIEVE
9.2.1 Lnea tipo L- 1 continuas y discontinuas de 12 cm
9.5 SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS UNIDIRECCIONALES Y BIDIRECCIONALES
9.6. CONOS DE SEALIZACION H= 45 cm. CON FRANJAS DE CINTA REFLECTIVA
9.7. CONOS DE SEALIZACION H= 70 cm. CON FRANJAS DE CINTA REFLECTIVA
9.8. SUMINISTRO E INSTALACIN POSTES DE KILOMETRAJE
10. TRANSPORTE
10.1 TRANSPORTE DE MATERIAL DESPUES DE 5 Km
11. VARIOS
11.1 EMPRADIZACION
11.2 DEMOLICION OBRAS EN CONCRETO CICLOPEO Y SIMPLE, INCLUYE RETIRO DE
SOBRANTES (ACARREO lIBRE 5 Km.)
11.3 DEMOLICION OBRAS EN CONCRETO REFORZADO, INCLUYE RETIRO DE SOBRANTES
(ACARREO LIBRE DE 5 Km).
11.4 SIEMPRA DE PLNTULAS - COMPENSACIN FORESTAL
11.5 MUROS DE TIERRA ARMADA
11.6 SACOS DE TIERRA
11.7. CERCA DE ALAMBRE DE PAS
11.8. MATERIAL GRANULAR D>2"
$ 372,428.28
$ 486,970.92
$ 197,999.64
$ 358,673.40
$ 1,800.36
$ 2,160.00
$ 9,396.00
$ 3,167.64
$ 1,080.00
$ 10,973.88
$ 13,169.52
$ 21,553.56
$ 18,621.36
$ 132,939.36
$ 139,543.56
$ 162,382.32
$ 190,750.68
$ 204,185.88
$ 203,995.80
$ 217,431.00
$ 246,417.12
$ 41,949.36
$ 130,792.32
$ 1,436.40
$ 1,686.96
$ 56,581.20
$ 690.12
$ 375.84
$ 4,371.84
$ 16,557.48
$ 177,361.92
$ 1,671.84
$ 227,602.44
$ 246,592.08
$ 275,201.28
$ 775,224.00
$ 113,751.00
$ 58,262.76
$ 7,349.40
$ 181,616.04
Y COMPACTACION ,
H SEGN INVIAS.
$ 19,348.96
$ 25,223.96
$ 1,475,000.00
$ 26,453.13
$ 35,828.13
$ 360,305.52
$ 3,707.03
$ 266,296.88
$ 4,738.02
$ 362,945.47
$ 333,218.47
$ 236,350.00
236350
377000
$ 756.25
$ 11,000.00
$ 18,437.50
$ 33,000.00
$ 49,386.88
$ 781.25
$ 13,312.50
$ 35,458.33
$ 186,218.04
$ 2,291.70
$ 24,555.00
$ 3,062.50
$ 8,550.00
$ 41,250.00
FACULTAD DE INGENIERIA
ESCUELA DE INGENIERIA DE TRANSPORTE Y VIAS Y ESCUELA DE INGENIERIA CIVIL
1. PRELIMINARES
UNIDAD:
ITEM:
Ha
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Herramienta menor
15909.09
1.00
$ 15,909.09
Volqueta
25000.00
0.50
$ 50,000.00
SUBTOTAL
$ 65,909.09
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.0
0.22
$ 119,318.18
Ayudantes
12500.00
75.00%
43,750.0
0.22
$ 198,863.64
SUBTOTAL
TOTAL COSTO DIRECTO
$ 318,181.82
$ 384,090.91
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 96,022.73
$ 480,113.64
FACULTAD DE INGENIERIA
ESCUELA DE INGENIERIA DE TRANSPORTE Y VIAS Y ESCUELA DE INGENIERIA CIVIL
1. PRELIMINARES
UNIDAD:
Ha
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Herramienta menor
23333.33
1.00
$ 23,333.33
Volqueta
25000.00
0.50
$ 50,000.00
SUBTOTAL
$ 73,333.33
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.0
0.15
$ 175,000.00
Ayudantes
12500.00
75.00%
43,750.0
0.15
$ 291,666.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 466,666.67
$ 540,000.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 135,000.00
$ 675,000.00
FACULTAD DE INGENIERIA
ESCUELA DE INGENIERIA DE TRANSPORTE Y VIAS Y ESCUELA DE INGENIERIA CIVIL
1. PRELIMINARES
UNIDAD:
m3
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
55000.00
50.00
$ 1,100.00
Volqueta
25000.00
50.00
$ 500.00
Cargador
45000.00
50.00
$ 900.00
SUBTOTAL
$ 2,500.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
SUBTOTAL
TOTAL COSTO DIRECTO
RENDIM.
VR.UNITARO
$ 0.00
$ 2,500.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 625.00
$ 3,125.00
FACULTAD DE INGENIERIA
ESCUELA DE INGENIERIA DE TRANSPORTE Y VIAS Y ESCUELA DE INGENIERIA CIVIL
1. PRELIMINARES
UNIDAD:
Km
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Equipo de topografia
Herramienta menor
RENDIM.
VR.UNITARIO
12500.00
0.05
$ 250,000.00
1954.17
1.00
$ 1,954.17
SUBTOTAL
$ 251,954.17
2. MATERIALES
DESCRIPCION
UNIDAD
Pintura y estacas
PRECIO UNIT.
Gl
CANTIDAD
2500.00
VR.UNITARIO
1
$ 2,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Topografo
65000.00
75.00%
113,750.0
1.50
$ 75,833.33
Cadeneroa
30000.00
75.00%
157,500.0
1.50
$ 105,000.00
Trochero
12500.00
75.00%
21,875.0
1.50
$ 14,583.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 195,416.67
$ 449,870.83
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 112,467.71
$ 562,338.54
2. EXPLANACIONES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
45,000.00
25.00
$ 1,800.00
Volqueta
25,000.00
50.00
$ 500.00
SUBTOTAL
$ 2,300.00
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
VR.UNIT.
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
SUBTOTAL
VR.UNIT.
$ 0.00
$ 2,300.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
Factor de incremento por municipio
25%
$ 575.00
$ 2,875.00
2. EXPLANACIONES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
45000.00
20.00
$ 2,250.00
Volqueta
25000.00
50.00
$ 500.00
SUBTOTAL
$ 2,750.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
SUBTOTAL
RENDIM.
VR.UNITARO
$ 0.00
$ 2,750.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 687.50
$ 3,437.50
2. EXPLANACIONES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Bulldozer
55000.00
12.00
$ 4,583.33
Compresor
38000.00
12.00
$ 3,166.67
131.25
1.00
$ 500.00
25000.00
50.00
$ 500.00
45000.00
50.00
SUBTOTAL
$ 900.00
$ 9,650.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Dinamita
Kg
$ 6,123
0.2
$ 1,224.52
Cordon detonante
Ml
496.10
2.00
$ 992.20
Fulminante
Un
411.40
1.00
$ 411.40
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,628.12
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Machinero
25000.00
75.00%
43,750.0
50.00
$ 875.00
Ayudante
12500.00
75.00%
21,875.0
50.00
$ 437.50
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$ 1,312.50
$ 13,590.62
25%
$ 3,397.66
$ 16,988.28
2. EXPLANACIONES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
Retroexcavadora
45,000.00
30.00
Volqueta
25,000.00
30.00
$ 833.33
Vibrocompactador
43,000.00
30.00
$ 1,433.33
Motoniveladora
50,000.00
30.00
$ 1,666.67
25,000.00
30.00
Carrotanque
SUBTOTAL
$ 1,500.00
$ 833.33
$ 6,266.67
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
VR.UNIT.
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
RENDIM.
VR.UNIT.
$ 0.00
$ 6,266.67
25%
$ 1,566.67
$ 7,833.33
2. EXPLANACIONES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Retroexcavadora
45000.00
RENDIM.
50.00
SUBTOTAL
VR.UNITARIO
$ 900.00
$ 900.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
SUBTOTAL
TOTAL COSTO DIRECTO
RENDIM.
VR.UNITARO
$ 0.00
$ 900.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 225.00
$ 1,125.00
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
466.67
1.00
SUBTOTAL
VR.UNIT.
$ 466.67
$ 466.67
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
VR.UNIT.
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15000.00
75.00%
26,250.00
7.50
$ 3,500.00
Ayudantes
12500.00
75.00%
43,750.00
7.50
$ 5,833.33
SUBTOTAL
$ 9,333.33
$ 9,800.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 2,450.00
$ 12,250.00
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
656.25
SUBTOTAL
1.00
VR.UNITARIO
$ 657.25
$ 657.25
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.00
$ 4,375.00
Ayudante
15000.00
75.00%
52,500.00
6.00
$ 8,750.00
SUBTOTAL
$ 13,125.00
$ 13,782.25
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 3,445.56
$ 17,227.81
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Compresor
Herramienta menor 5% M.O.
RENDIM.
VR.UNITARIO
38000.00
20.00
$ 1,900.00
875.00
1.00
$ 875.00
SUBTOTAL
$ 2,775.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Dinamita
Kg
6122.60
0.2
$ 1,224.52
Cordon detonante
Ml
496.10
2.00
$ 992.20
Fulminante
Un
411.40
1.00
$ 411.40
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,628.12
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Machinero
25000.00
75.00%
43,750.00
5.00
$ 8,750.00
Ayudantes
12500.00
75.00%
43,750.00
5.00
$ 8,750.00
SUBTOTAL
$ 17,500.00
$ 22,903.12
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 5,725.78
$ 28,628.90
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Motobomba
Herramienta menor 5% M.O.
RENDIM.
VR.UNITARIO
7500.00
1.00
$ 7,500.00
583.33
1.00
$ 583.33
SUBTOTAL
$ 8,083.33
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.00
$ 4,375.00
Ayudantes
12500.00
75.00%
43,750.00
6.00
$ 7,291.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 11,666.67
$ 19,750.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 4,937.50
$ 24,687.50
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Mezcladora
RENDIM.
VR.UNIT.
8000.00
0.75
$ 10,666.67
226.04
0.75
$ 301.39
SUBTOTAL
$ 10,968.06
2. MATERIALES
DESCRIPCION
UNIDAD
Cemento
PREC. UNIT.
Bto.
21,500.00
CANT.
VR.UNIT.
6.00
$ 129,000.00
Arena lavada
25000.00
0.72
$ 17,875.00
Gravilla
45000.00
0.72
$ 32,175.00
Agua
Lts.
20.00
145.00
$ 2,900.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 9,097.50
SUBTOTAL
$ 191,047.50
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15000.00
75.00%
26,250.00
6.00
$ 4,375.00
Ayudantes
12500.00
75.00%
109,375.00
6.00
$ 18,229.17
SUBTOTAL
$ 22,604.17
$ 224,619.72
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 56,154.93
$ 280,774.65
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
710.94
1.00
SUBTOTAL
VR.UNIT.
$ 710.94
$ 710.94
2. MATERIALES
DESCRIPCION
UNIDAD
Rajn
PREC. UNIT.
308,476.17
CANT.
VR.UNIT.
0.60
$ 185,085.70
20000.00
0.40
$ 8,000.00
3000.00
3.00
$ 9,000.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 202,085.70
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15,000.00
75.00%
26,250.00
8.00
$ 3,281.25
Ayudantes
12,500.00
75.00%
87,500.00
8.00
$ 10,937.50
SUBTOTAL
$ 14,218.75
$ 217,015.39
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 54,253.85
$ 271,269.23
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
710.94
1.00
SUBTOTAL
VR.UNIT.
$ 710.94
$ 710.94
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
357,192.31
CANT.
0.60
VR.UNIT.
$ 214,315.39
Rajn
20000.00
0.40
$ 8,000.00
Formaleta
12000.00
3.00
$ 36,000.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 258,315.39
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15,000.00
75.00%
26,250.00
8.00
$ 3,281.25
Ayudantes
12,500.00
75.00%
87,500.00
8.00
$ 10,937.50
SUBTOTAL
$ 14,218.75
$ 273,245.08
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 68,311.27
$ 341,556.34
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
473.96
1.00
$ 473.96
6000.00
0.50
$ 12,000.00
SUBTOTAL
$ 12,473.96
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
PRECIO UNIT.
CANTIDAD
243,676.25
3000.00
VR.UNITARIO
1.10
$ 268,043.88
3.00
$ 9,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 277,043.88
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.00
$ 4,375.00
Ayudantes
12500.00
75.00%
87,500.00
6.00
$ 14,583.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 18,958.33
$ 308,476.17
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 77,119.04
$ 385,595.21
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
568.75
1.00
$ 568.75
6000.00
0.40
$ 15,000.00
SUBTOTAL
$ 15,568.75
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
PRECIO UNIT.
CANTIDAD
254,420.28
3000.00
VR.UNITARIO
1.10
$ 279,862.31
3.00
$ 9,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 288,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
5.00
$ 5,250.00
Ayudantes
12500.00
75.00%
87,500.00
5.00
$ 17,500.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 22,750.00
$ 327,181.06
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 81,795.26
$ 408,976.32
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
710.94
1.00
$ 710.94
6000.00
0.50
$ 12,000.00
SUBTOTAL
$ 12,710.94
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
243,676.25
12000.00
VR.UNITARIO
1.10
$ 268,043.88
4.00
$ 48,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 316,043.88
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12,500.00
75.00%
87,500.00
4.00
$ 21,875.00
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$ 28,437.50
$ 357,192.31
25%
$ 89,298.08
$ 446,490.39
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
710.94
1.00
$ 710.94
6000.00
0.50
$ 12,000.00
SUBTOTAL
$ 12,710.94
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
PRECIO UNIT.
CANTIDAD
254,420.28
12000.00
VR.UNITARIO
1.10
$ 279,862.31
4.00
$ 48,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 327,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12,500.00
75.00%
87,500.00
4.00
$ 21,875.00
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$ 28,437.50
$ 369,010.74
25%
$ 92,252.69
$ 461,263.43
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
710.94
1.00
$ 710.94
6000.00
0.30
$ 20,000.00
SUBTOTAL
$ 20,710.94
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
PRECIO UNIT.
CANTIDAD
254,420.28
20000.00
VR.UNITARIO
1.10
$ 279,862.31
3.80
$ 76,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 355,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12,500.00
75.00%
87,500.00
4.00
$ 21,875.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 28,437.50
$ 405,010.74
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 101,252.69
$ 506,263.43
ITEM:
UNIDAD:
Ml
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
1137.50
1.00
SUBTOTAL
VR.UNITARIO
$ 1,137.50
$ 1,137.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Ml
43000.00
1.00
$ 43,000.00
Cemento
Kg
500.00
8.00
$ 4,000.00
Arena
25000.00
0.02
$ 375.00
Agua
Lts
20.00
10.00
$ 200.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 47,575.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
5.00
$ 5,250.00
Ayudantes
12,500.00
75.00%
87,500.00
5.00
$ 17,500.00
SUBTOTAL
$ 22,750.00
$ 71,462.50
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 17,865.63
$ 89,328.13
ITEM:
UNIDAD:
Ml
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
1421.88
SUBTOTAL
1.00
VR.UNITARIO
$ 1,421.88
$ 1,421.88
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Ml
160000.00
1.00
$ 160,000.00
Cemento
Kg
500.00
10.00
$ 5,000.00
Arena
25000.00
0.02
$ 500.00
Agua
Lts
20.00
10.00
$ 200.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 165,700.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12,500.00
75.00%
87,500.00
4.00
$ 21,875.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 28,437.50
$ 195,559.38
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 48,889.84
$ 244,449.22
ITEM:
UNIDAD:
KG
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor
RENDIM.
23.33
SUBTOTAL
1.00
VR.UNITARIO
$ 23.33
$ 23.33
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Kg
2000.00
1.10
$ 2,200.00
Kg
2200.00
0.03
$ 66.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,266.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
150.00
$ 175.00
Ayudante
12,500.00
75.00%
43,750.00
150.00
$ 291.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 466.67
$ 2,756.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 689.00
$ 3,445.00
ITEM:
UNIDAD:
KG
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor
RENDIM.
35.00
SUBTOTAL
1.00
VR.UNITARIO
$ 35.00
$ 35.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Kg
2000.00
1.10
$ 2,200.00
Kg
2200.00
0.03
$ 66.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,266.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
100.00
$ 262.50
Ayudante
12,500.00
75.00%
43,750.00
100.00
$ 437.50
$ 700.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,001.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 750.25
$ 3,751.25
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
1137.50
SUBTOTAL
1.00
VR.UNITARIO
$ 1,137.50
$ 1,137.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Rajon
20000.00
1.20
$ 24,000.00
Un
34000.00
0.50
$ 17,000.00
Kg
2600.00
0.50
$ 1,300.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 42,300.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
5.00
$ 5,250.00
Ayudantes
12,500.00
75.00%
87,500.00
5.00
$ 17,500.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 22,750.00
$ 66,187.50
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 16,546.88
$ 82,734.38
ITEM:
UNIDAD:
Ml
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
43.75
SUBTOTAL
1.00
VR.UNITARIO
$ 43.75
$ 43.75
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
Ayudante
PRESTACION JORN.TOTAL
12500.00
75.00%
RENDIM.
21,875.00
SUBTOTAL
TOTAL COSTO DIRECTO
VR.UNITARO
25.00
$ 875.00
$ 875.00
$ 918.75
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 229.69
$ 1,148.44
ITEM:
UNIDAD:
Ml
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Motoniveladora
50000.00
SUBTOTAL
RENDIM.
115.00
VR.UNITARIO
$ 434.78
$ 434.78
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
SUBTOTAL
TOTAL COSTO DIRECTO
RENDIM.
VR.UNITARO
$ 0.00
$ 434.78
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 108.70
$ 543.48
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Rana
Herramienta menor 5% M.O.
RENDIM.
VR.UNITARIO
6500.00
3.00
$ 2,166.67
183.75
1.00
$ 183.75
SUBTOTAL
$ 2,350.42
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 0.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15,000.00
75.00%
26,250.00
25.00
$ 1,050.00
Ayudantes
12,500.00
75.00%
65,625.00
25.00
$ 2,625.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,675.00
$ 6,025.42
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 1,506.35
$ 7,531.77
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
656.25
1.00
SUBTOTAL
VR.UNIT.
$ 656.25
$ 656.25
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
VR.UNIT.
29000.00
0.900
$ 26,100.00
Gravilla
45000.00
0.085
$ 3,825.00
1455.00
5.000
$ 7,275.00
Material sellante
6000.00
0.085
$ 510.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 37,710.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15,000.00
75.00%
26,250.00
7.00
$ 3,750.00
Ayudante
12,500.00
75.00%
65,625.00
7.00
$ 9,375.00
SUBTOTAL
$ 13,125.00
$ 51,491.25
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 12,872.81
$ 64,364.06
ITEM:
UNIDAD:
(RANA O VIBROCOMPACTADOR)
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Rana
RENDIM.
VR.UNIT.
6500.00
3.00
$ 2,166.67
183.75
1.00
$ 183.75
Cargador
45000.00
80.00
$ 562.50
Volqueta
25000.00
15.00
$ 1,666.67
SUBTOTAL
$ 4,579.58
2. MATERIALES
DESCRIPCION
UNIDAD
Material de afirmado
PREC. UNIT.
CANT.
12000.00
1.25
VR.UNIT.
$ 15,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 15,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15,000.00
75.00%
26,250.00
25.00
$ 1,050.00
Ayudantes
12,500.00
75.00%
65,625.00
25.00
$ 2,625.00
SUBTOTAL
$ 3,675.00
$ 23,254.58
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 5,813.65
$ 29,068.23
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
875.00
1.00
VR.UNIT.
$ 875.00
SUBTOTAL
$ 875.00
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
Junta de madera
Gl
PREC. UNIT.
CANT.
224,619.72
VR.UNIT.
1.05
$ 235,850.71
5000.00
0.40
$ 2,000.00
5500.00
1.00
$ 5,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 243,350.71
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15,000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12,500.00
75.00%
43,750.00
4.00
$ 10,937.50
SUBTOTAL
$ 17,500.00
$ 261,725.71
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 65,431.43
$ 327,157.14
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
10.94
1.00
VR.UNIT.
$ 10.94
SUBTOTAL
$ 10.94
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
1455.00
VR.UNIT.
1.00
$ 1,455.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 1,455.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
Ayudantes
PRESTAC.
12500.00
JORN.TOT.
75.00%
RENDIM.
43,750.00
VR.UNIT.
100.00
$ 437.50
SUBTOTAL
$ 437.50
$ 1,903.44
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 475.86
$ 2,379.30
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
21.88
1.00
VR.UNIT.
$ 21.88
SUBTOTAL
$ 21.88
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
16500.00
CANT.
1.00
VR.UNIT.
$ 16,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 16,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
Ayudantes
PRESTAC.
12500.00
JORN.TOT.
75.00%
RENDIM.
43,750.00
SUBTOTAL
50.00
VR.UNIT.
$ 875.00
$ 875.00
$ 17,396.88
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
$ 4,349.22
$ 21,746.09
4. PUENTES
UNIDAD:
4.1 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 0 A 7.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
2515.63
1.00
$ 2,515.63
Vibrador
6000.00
0.75
$ 8,000.00
SUBTOTAL
$ 10,515.63
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
35000.00
VR.UNITARIO
1.10
$ 279,862.31
1.00
$ 35,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 314,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12500.00
75.00%
175,000.00
4.00
$ 43,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 50,312.50
$ 375,690.43
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 93,922.61
$ 469,613.04
4. PUENTES
UNIDAD:
4.2 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 7,1 A 14.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
2515.63
1.00
$ 2,515.63
Vibrador
6000.00
0.38
$ 15,789.47
$ 18,305.10
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
47000.00
VR.UNITARIO
1.1
$ 279,862.31
1.00
$ 47,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 326,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
4.00
$ 6,562.50
Ayudantes
12500.00
75.00%
175,000.00
4.00
$ 43,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 50,312.50
$ 395,479.90
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 98,869.98
$ 494,349.88
4. PUENTES
UNIDAD:
4.3 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 14,1 A 21.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
3354.17
1.00
$ 3,354.17
Vibrador
6000.00
0.38
$ 15,789.47
$ 19,143.64
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
61000.00
VR.UNITARIO
1.10
$ 279,862.31
1.00
$ 61,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 340,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
3.00
$ 8,750.00
Ayudantes
12500.00
75.00%
175,000.00
3.00
$ 58,333.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 67,083.33
$ 427,089.28
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 106,772.32
$ 533,861.60
4. PUENTES
ITEM:
4.4 CONCRETO DE 3000 P.S.I PARA BARANDAS, INCLUYE REFUERZO , SEGUN MODELO
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 1% M. O.
RENDIM.
612.50
SUBTOTAL
VR.UNITARIO
1.00
$ 612.50
$ 612.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
254,420.28
1.10
$ 279,862.31
Kg.
3,001.00
85.02
$ 255,145.02
Kg.
2,756.00
83.52
$ 230,181.12
Tabla burra
Ml
2500.00
33.33
$ 83,325.00
Repisa
Ml
3500.00
25.00
$ 87,500.00
Alambre No. 18
Kg
2200.00
2.00
$ 4,400.00
Puntilla
Lb.
1800.00
8.00
$ 14,400.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 954,813.45
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
1.50
$ 17,500.00
Ayudantes
12500.00
75.00%
65,625.00
1.50
$ 43,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 61,250.00
$ 1,016,675.95
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 254,168.99
###
4. PUENTES
ITEM:
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
Equipo de soldadura
RENDIM.
VR.UNITARIO
236.25
1.00
$ 236.25
6000.00
2.50
$ 2,400.00
$ 2,636.25
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Ml
17800.00
3.5
$ 62,300.00
Glb
2000.00
1.00
$ 2,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 64,300.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Soldador
40000.00
75.00%
70,000.00
25.00
$ 2,800.00
Oficial
15000.00
75.00%
26,250.00
25.00
$ 1,050.00
Ayudantes
12500.00
75.00%
21,875.00
25.00
$ 875.00
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$ 4,725.00
$ 71,661.25
25%
$ 17,915.31
$ 89,576.56
4. PUENTES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
87.50
SUBTOTAL
VR.UNITARIO
1.00
$ 87.50
$ 87.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
117,740.00
1.1
VR.UNITARIO
$ 129,514.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 129,514.00
3. MANO DE OBRA
TRABAJADOR
Oficial
JORNAL
1
15000.00
PRESTACION JORN.TOTAL
75.00%
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
RENDIM.
26,250.00
3.00
VR.UNITARO
$ 8,750.00
$ 8,750.00
$ 138,351.50
25%
$ 34,587.88
$ 172,939.38
4. PUENTES
UNIDAD:
ML
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Herramienta menor 5% M. O.
2333.33
1.00
$ 2,333.33
Equipo de soldadura
6000.00
0.50
$ 12,000.00
$ 14,333.33
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Ml
14,450.00
2.00
Kg
2,127.63
4.00
$ 8,510.50
Ml
18800.00
1.05
$ 19,740.00
Un
10000.00
2.00
$ 20,000.00
Glb
1000.00
1.00
$ 1,000.00
DESPERDICIO %
$ 28,900.00
$ 0.00
SUBTOTAL
$ 78,150.50
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Soldador
40000.00
75.00%
70,000.00
3.00
$ 23,333.33
Ayudantes
12500.00
75.00%
43,750.00
3.00
$ 14,583.33
Oficial
15000.00
0.75
26,250.00
3.00
$ 8,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$ 46,666.67
$ 139,150.50
25%
$ 34,787.63
$ 173,938.13
4. PUENTES
UNIDAD:
ML
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
21.88
SUBTOTAL
VR.UNITARIO
1.00
$ 21.88
$ 21.88
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
CANTIDAD
9,000.00
1.00
VR.UNITARIO
$ 9,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 9,000.00
3. MANO DE OBRA
TRABAJADOR
Ayudante
JORNAL
1
12500.00
PRESTACION JORN.TOTAL
75.00%
RENDIM.
21,875.00
50.00
SUBTOTAL
TOTAL COSTO DIRECTO
$
$
VR.UNITARO
$ 437.50
$ 437.50
$ 9,459.38
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 2,364.84
$ 11,824.22
4. PUENTES
ITEM:
UNIDAD:
ML
INCLUYE REJILLA
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
0.00
SUBTOTAL
VR.UNITARIO
1.00
$ 0.00
$ 0.00
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
Un
PRECIO UNIT.
CANTIDAD
16,500.00
30000.00
VR.UNITARIO
1.00
$ 16,500.00
1.00
$ 30,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 46,500.00
3. MANO DE OBRA
TRABAJADOR
Ayudante
JORNAL
1
PRESTACION JORN.TOTAL
0.00
RENDIM.
75.00%
50.00
SUBTOTAL
TOTAL COSTO DIRECTO
$
$
VR.UNITARO
$ 0.00
$ 0.00
$ 46,500.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 11,625.00
$ 58,125.00
4. PUENTES
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
583.33
SUBTOTAL
VR.UNITARIO
1.00
$ 583.33
$ 583.33
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Ml
PRECIO UNIT.
CANTIDAD
254,420.28
800.00
VR.UNITARIO
1.05
$ 267,141.29
12.50
$ 10,000.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 277,141.29
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.00
$ 4,375.00
Ayudantes
12500.00
75.00%
43,750.00
6.00
$ 7,291.67
SUBTOTAL
$ 11,666.67
$ 289,391.29
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 72,347.82
$ 361,739.11
4. PUENTES
UNIDAD:
Ml
ITEM:
4.11 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 5/8". SEGUN
DISEO Y ESPECIFICACION DEL FNCV
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
379.17
SUBTOTAL
VR.UNITARIO
1.00
$ 379.17
$ 379.17
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
CANTIDAD
7,000.00
VR.UNITARIO
1
$ 7,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 7,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
30.00
$ 875.00
Ayudantes
12500.00
75.00%
87,500.00
30.00
$ 2,916.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,791.67
$ 11,170.83
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 2,792.71
$ 13,963.54
4. PUENTES
ITEM:
4.12 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 3/4". SEGUN
UNIDAD:
ML
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
379.17
SUBTOTAL
VR.UNITARIO
1.00
$ 379.17
$ 379.17
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
CANTIDAD
600.00
VR.UNITARIO
1
$ 600.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 600.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
30.00
$ 875.00
Ayudantes
12500.00
75.00%
87,500.00
30.00
$ 2,916.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,791.67
$ 4,770.83
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 1,192.71
$ 5,963.54
4. PUENTES
ITEM:
4.12 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 1". SEGUN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
379.17
SUBTOTAL
VR.UNITARIO
1.00
$ 379.17
$ 379.17
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
CANTIDAD
17,800.00
VR.UNITARIO
1
$ 17,800.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 17,800.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
30.00
$ 875.00
Ayudantes
12500.00
75.00%
87,500.00
30.00
$ 2,916.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,791.67
$ 21,970.83
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 5,492.71
$ 27,463.54
4. PUENTES
ITEM:
4.13 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 1-1/8". SEGUN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
455.00
SUBTOTAL
VR.UNITARIO
1.00
$ 455.00
$ 455.00
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
CANTIDAD
15,480.00
VR.UNITARIO
1
$ 15,480.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 15,480.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
25.00
$ 1,050.00
Ayudantes
12500.00
75.00%
87,500.00
25.00
$ 3,500.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 4,550.00
$ 20,485.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 5,121.25
$ 25,606.25
4. PUENTES
ITEM:
4.14 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 1-1/4". SEGUN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
455.00
SUBTOTAL
VR.UNITARIO
1.00
$ 455.00
$ 455.00
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
19,100.00
CANTIDAD
1.00
VR.UNITARIO
$ 19,100.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 19,100.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
25.00
$ 1,050.00
Ayudantes
12500.00
75.00%
87,500.00
25.00
$ 3,500.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 4,550.00
$ 24,105.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 6,026.25
$ 30,131.25
4. PUENTES
ITEM:
4.15 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 1-1/2". SEGUN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
787.50
SUBTOTAL
VR.UNITARIO
1.00
$ 787.50
$ 787.50
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
30,300.00
CANTIDAD
1.00
VR.UNITARIO
$ 30,300.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 30,300.00
3. MANO DE OBRA
TRABAJADOR
Oficial
JORNAL
1
15000.00
PRESTACION JORN.TOTAL
75.00%
26,250.00
RENDIM.
20.00
VR.UNITARO
$ 1,312.50
Ayudantes
12500.00
75.00%
131,250.00
20.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 6,562.50
$ 7,875.00
$ 38,962.50
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 9,740.63
$ 48,703.13
4. PUENTES
ITEM:
4.16 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D=1- 5/8". SEGUN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
787.50
SUBTOTAL
VR.UNITARIO
1.00
$ 787.50
$ 787.50
2. MATERIALES
DESCRIPCION
UNIDAD
Ml
PRECIO UNIT.
35,600.00
CANTIDAD
1.00
VR.UNITARIO
$ 35,600.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 35,600.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
20.00
$ 1,312.50
Ayudantes
12500.00
75.00%
131,250.00
20.00
$ 6,562.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 7,875.00
$ 44,262.50
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 11,065.63
$ 55,328.13
4. PUENTES
UNIDAD:
ML
ITEM:
4.17 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D= 1-3/4". SEGUN
DISEO Y ESPECIFICACION DEL FNCV
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
787.50
SUBTOTAL
VR.UNITARIO
1.00
$ 787.50
$ 787.50
2. MATERIALES
DESCRIPCION
Cable de acero Ref: 6*19 A-A D=1-3/4"
UNIDAD
Ml
PRECIO UNIT.
41,400.00
CANTIDAD
1.00
VR.UNITARIO
$ 41,400.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
3. MANO DE OBRA
$ 41,400.00
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
20.00
$ 1,312.50
Ayudantes
12500.00
75.00%
131,250.00
20.00
$ 6,562.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 7,875.00
$ 50,062.50
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 12,515.63
$ 62,578.13
4. PUENTES
ITEM:
4.18 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D=1-7/8". SEGN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
1050.00
SUBTOTAL
RENDIM.
VR.UNITARIO
1.00
$ 1,050.00
$ 1,050.00
2. MATERIALES
DESCRIPCION
Cable de acero Ref: 6*19 A-A D=1-7/8"
UNIDAD
Ml
PRECIO UNIT.
47,500.00
CANTIDAD
1.00
VR.UNITARIO
$ 47,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 47,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
15.00
$ 1,750.00
Ayudantes
12500.00
75.00%
131,250.00
15.00
$ 8,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 10,500.00
$ 59,050.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 14,762.50
$ 73,812.50
4. PUENTES
ITEM:
4.19 SUMINISTRO E INSTALACION DE CABLE DE ACERO REF: 6*19 A-A - D=2". SEGN
UNIDAD:
ML
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
1050.00
SUBTOTAL
RENDIM.
VR.UNITARIO
1.00
$ 1,050.00
$ 1,050.00
2. MATERIALES
DESCRIPCION
Cable de acero Ref: 6*19 A-A D=2"
UNIDAD
Ml
PRECIO UNIT.
54,000.00
CANTIDAD
1.00
VR.UNITARIO
$ 54,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 54,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
15.00
$ 1,750.00
Ayudantes
12500.00
75.00%
131,250.00
15.00
$ 8,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 10,500.00
$ 65,550.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 16,387.50
$ 81,937.50
4. PUENTES
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
160.42
SUBTOTAL
VR.UNITARIO
1.00
$ 160.42
$ 160.42
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D= 5/8"
UNIDAD
Un
PRECIO UNIT.
605.00
CANTIDAD
1.00
VR.UNITARIO
$ 605.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 605.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
15.00
$ 1,750.00
Ayudantes
12500.00
75.00%
21,875.00
15.00
$ 1,458.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,208.33
$ 3,973.75
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 993.44
$ 4,967.19
4. PUENTES
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
160.42
SUBTOTAL
VR.UNITARIO
1.00
$ 160.42
$ 160.42
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D=3/4"
UNIDAD
Un
PRECIO UNIT.
174,000.00
CANTIDAD
1.00
VR.UNITARIO
$ 174,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 174,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
15.00
$ 1,750.00
Ayudantes
12500.00
75.00%
21,875.00
15.00
$ 1,458.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,208.33
$ 177,368.75
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 44,342.19
$ 221,710.94
4. PUENTES
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
160.42
SUBTOTAL
VR.UNITARIO
1.00
$ 160.42
$ 160.42
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D= 1"
UNIDAD
Un
PRECIO UNIT.
307,500.00
CANTIDAD
1.00
VR.UNITARIO
$ 307,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 307,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
15.00
$ 1,750.00
Ayudantes
12500.00
75.00%
21,875.00
15.00
$ 1,458.33
SUBTOTAL
TOTAL COSTO DIRECTO
$ 3,208.33
$ 310,868.75
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 77,717.19
$ 388,585.94
4. PUENTES
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
240.63
SUBTOTAL
VR.UNITARIO
1.00
$ 240.63
$ 240.63
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D= 1-1/8"
UNIDAD
Un
PRECIO UNIT.
399,700.00
CANTIDAD
1.00
VR.UNITARIO
$ 399,700.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 399,700.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
10.00
$ 2,625.00
Ayudantes
12500.00
75.00%
21,875.00
10.00
$ 2,187.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 4,812.50
$ 404,753.13
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 101,188.28
$ 505,941.41
4. PUENTES
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
240.63
SUBTOTAL
VR.UNITARIO
1.00
$ 240.63
$ 240.63
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D= 1-1/4"
UNIDAD
Un
PRECIO UNIT.
399,700.00
CANTIDAD
1.00
VR.UNITARIO
$ 399,700.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 399,700.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
10.00
$ 2,625.00
Ayudantes
12500.00
75.00%
21,875.00
10.00
$ 2,187.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 4,812.50
$ 404,753.13
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 101,188.28
$ 505,941.41
4. PUENTES
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
240.63
SUBTOTAL
VR.UNITARIO
1.00
$ 240.63
$ 240.63
2. MATERIALES
DESCRIPCION
Tensor para cable de acero D= 1-1/2"
UNIDAD
Un
PRECIO UNIT.
650,200.00
CANTIDAD
1.00
VR.UNITARIO
$ 650,200.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 650,200.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
10.00
$ 2,625.00
Ayudantes
12500.00
75.00%
21,875.00
10.00
$ 2,187.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 4,812.50
$ 655,253.13
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 163,813.28
$ 819,066.41
4. PUENTES
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
481.25
SUBTOTAL
VR.UNITARIO
1.00
$ 481.25
$ 481.25
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Un
845,500.00
1.00
$ 845,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 845,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
5.00
$ 5,250.00
Ayudantes
12500.00
75.00%
21,875.00
5.00
$ 4,375.00
SUBTOTAL
TOTAL COSTO DIRECTO
$ 9,625.00
$ 855,606.25
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 213,901.56
###
4. PUENTES
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
802.08
SUBTOTAL
2. MATERIALES
VR.UNITARIO
1.00
$ 802.08
$ 802.08
DESCRIPCION
Tensor para cable de acero D= 2"
UNIDAD
PRECIO UNIT.
Un
2,582,000.00
CANTIDAD
1.00
VR.UNITARIO
$ 2,582,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 2,582,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
3.00
$ 8,750.00
Ayudantes
12500.00
75.00%
21,875.00
3.00
$ 7,291.67
SUBTOTAL
TOTAL COSTO DIRECTO
$ 16,041.67
$ 2,598,843.75
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 649,710.94
###
4. PUENTES
ITEM:
UNIDAD:
UN
PESADO, D=5/8".
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
48.13
SUBTOTAL
VR.UNITARIO
1.00
$ 48.13
$ 48.13
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
9,300.00
1.00
VR.UNITARIO
$ 9,300.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 9,300.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
50.00
$ 525.00
Ayudantes
12500.00
75.00%
21,875.00
50.00
$ 437.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 962.50
$ 10,310.63
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 2,577.66
$ 12,888.28
4. PUENTES
ITEM:
UNIDAD:
UN
PESADO, D="
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
48.13
SUBTOTAL
VR.UNITARIO
1.00
$ 48.13
$ 48.13
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
9,300.00
1.00
VR.UNITARIO
$ 9,300.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 9,300.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
50.00
$ 525.00
Ayudantes
12500.00
75.00%
21,875.00
50.00
$ 437.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 962.50
$ 10,310.63
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 2,577.66
$ 12,888.28
4. PUENTES
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
48.13
1.00
VR.UNITARIO
$ 48.13
SUBTOTAL
$ 48.13
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
9,600.00
1.00
VR.UNITARIO
$ 9,600.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 9,600.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
50.00
$ 525.00
Ayudantes
12500.00
75.00%
21,875.00
50.00
$ 437.50
SUBTOTAL
TOTAL COSTO DIRECTO
$ 962.50
$ 10,610.63
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 2,652.66
$ 13,263.28
4. PUENTES
ITEM:
UNIDAD:
UN
PESADO, D=1-"
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
80.21
1.00
VR.UNITARIO
$ 80.21
SUBTOTAL
$ 80.21
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
23,500.00
1.00
VR.UNITARIO
$ 23,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 23,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
30.00
$ 875.00
Ayudantes
12500.00
75.00%
21,875.00
30.00
$ 729.17
SUBTOTAL
TOTAL COSTO DIRECTO
$ 1,604.17
$ 25,184.38
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 6,296.09
$ 31,480.47
4. PUENTES
ITEM:
UNIDAD:
UN
PESADO, D=1-"
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
80.21
1.00
VR.UNITARIO
$ 80.21
SUBTOTAL
$ 80.21
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
24,500.00
1.00
VR.UNITARIO
$ 24,500.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 24,500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
30.00
$ 875.00
Ayudantes
12500.00
75.00%
21,875.00
30.00
$ 729.17
SUBTOTAL
TOTAL COSTO DIRECTO
$ 1,604.17
$ 26,184.38
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 6,546.09
$ 32,730.47
4. PUENTES
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
120.31
1.00
VR.UNITARIO
$ 120.31
SUBTOTAL
$ 120.31
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PRECIO UNIT.
CANTIDAD
26,000.00
1.00
VR.UNITARIO
$ 26,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
DESPERDICIO %
$ 0.00
SUBTOTAL
$ 26,000.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
20.00
$ 1,312.50
Ayudantes
12500.00
75.00%
21,875.00
20.00
$ 1,093.75
SUBTOTAL
TOTAL COSTO DIRECTO
$
$
$ 2,406.25
$ 28,526.56
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
$ 7,131.64
$ 35,658.20
5. AFIRMADO
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Volqueta
25000.00
15.00
1,666.67
Motoniveladora
50000.00
40.00
1,250.00
Cargador
45000.00
80.00
562.50
SUBTOTAL
3,479.17
2. MATERIALES
DESCRIPCION
UNIDAD
Material de afirmado
PRECIO UNIT.
CANTIDAD
12000.00
VR.UNITARIO
1
12,000.00
DESPERDICIO %
SUBTOTAL
12,000.00
3. TRANSPORTE
MATERIAL
costo
VR.UNITARO
0.00
SUBTOTAL
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
SUBTOTAL
TOTAL COSTO DIRECTO
VR.UNITARO
$
$
15,479.17
5. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
PRECIO UNITARIO AJUSTADO AL PESO
3,869.79
19,348.96
5. AFIRMADO
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
Volqueta
25000.00
15.00
1,666.67
Motoniveladora
50000.00
40.00
1,250.00
Vibrocompactador
43000.00
40.00
1,075.00
Cargador
45000.00
80.00
562.50
Carrotanque
25000.00
40.00
625.00
SUBTOTAL
5,179.17
2. MATERIALES
DESCRIPCION
UNIDAD
Material de afirmado
PRECIO UNIT.
CANTIDAD
12000.00
VR.UNITARIO
1.25
15,000.00
15,000.00
DESPERDICIO %
SUBTOTAL
3. TRANSPORTE
MATERIAL
Material de afirmado
1.25
costo
-
625.00
SUBTOTAL
VR.UNITARO
0.00
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
SUBTOTAL
TOTAL COSTO DIRECTO
VR.UNITARO
$
$
20,179.17
4. COSTOS INDIRECTO
Administracion, Utilidades e Imprevistos
25%
PRECIO UNITARIO AJUSTADO AL PESO
5,044.79
25,223.96
6. PAVIMENTACION
ITEM:
UNIDAD:
KM
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
Motoniveladora
50,000.00
0.10
500,000.00
Vibrocompactador
43,000.00
0.10
430,000.00
Carrotanque
25,000.00
0.10
250,000.00
SUBTOTAL
$1,180,000.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRE. UNIT.
CANT.
VR.UNIT.
RENDIM.
VR.UNIT.
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
SUBTOTAL
TOTAL COSTO DIRECTO
$1,180,000.00
4. COSTOS INDIRECTO
Administracin, Utilidades e Imprevistos
Factor de incremento por municipio
25%
295,000.00
$1,475,000.00
6. PAVIMENTACION
ITEM:
UNIDAD:
PARA SUB-BASE.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
Volqueta
25,000.00
15.00
1,666.67
Motoniveladora
50,000.00
30.00
1,666.67
Vibrocompactador
43,000.00
30.00
1,433.33
Cargador
45,000.00
80.00
562.50
Carrotanque
25,000.00
30.00
833.33
SUBTOTAL
$6,162.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRE. UNIT.
CANT.
12,000.00
VR.UNIT.
1.25
15,000.00
DESPERDICIO %
SUBTOTAL
$15,000.00
3. TRANSPORTE
MATERIAL
VOL. (M3)
REC. (km)
1.25
( M3 - km)
0
COSTO
-
VR.UNIT.
625.00
0.00
SUBTOTAL
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
5. COSTOS INDIRECTOS
$21,162.50
25%
5,290.63
$26,453.13
6. PAVIMENTACION
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
Volqueta
25,000.00
15.00
1,666.67
Motoniveladora
50,000.00
30.00
1,666.67
Vibrocompactador
43,000.00
30.00
1,433.33
Cargador
45,000.00
80.00
562.50
Carrotanque
25,000.00
30.00
SUBTOTAL
833.33
$6,162.50
2. MATERIALES
DESCRIPCION
UNIDAD
Material de base
PRE. UNIT.
CANTIDAD
18,000.00
1.25
VR.UNIT.
22,500.00
DESPERDICIO %
SUBTOTAL
$22,500.00
3. TRANSPORTE
MATERIAL
VOL. (M3)
Material de base
REC. (km)
1.25
( M3 - km)
0
COSTO
-
VR.UNIT.
625.00
0.00
SUBTOTAL
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
5. COSTOS INDIRECTOS
$28,662.50
25%
$7,165.63
$35,828.13
6. PAVIMENTACION
UNIDAD:
6.4 CONCRETO PARA PAVIMENTO RIGIDO 3500 PSI, INCLUYENDO JUNTAS DE ASFALTO LIQUIDO
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
284.38
1.00
SUBTOTAL
VR.UNIT.
284.38
$284.38
2. MATERIALES
DESCRIPCION
UNIDAD
PRE. UNIT.
CANT.
VR.UNIT.
254,420.28
1.05
267,141.29
Formaleta
Ml
600.00
7.00
4,200.00
Ml
800.00
3.00
2,400.00
DESPERDICIO %
SUBTOTAL
$273,741.29
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15000.00
75.00%
26,250.00
8.00
3281.25
Ayudantes
12500.00
75.00%
87,500.00
8.00
10937.50
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTO
$14,218.75
$288,244.42
25%
$72,061.10
$360,305.52
6.PAVIMENTACION
UNIDAD:
Kg
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
36.46
1.00
SUBTOTAL
VR.UNIT.
36.46
$36.46
2. MATERIALES
DESCRIPCION
UNIDAD
Acero PDR-60
Kg.
PREC. UNIT.
2000.00
CANT.
VR.UNIT.
1.10
2,200.00
DESPERDICIO %
SUBTOTAL
$2,200.00
3. MANO DE OBRA
TRABAJADOR
Ayudantes
JORNAL
2
12500.00
PRESTAC.
75.00%
JORN.TOT.
43,750.00
SUBTOTAL
TOTAL COSTO DIRECTO
RENDIM.
60.00
VR.UNIT.
729.17
$729.17
$2,965.63
4. COSTOS INDIRECTO
Administracin, Utilidades e Imprevistos
25%
$741.41
3,707.03
6. PAVIMENTACION
UNIDAD:
6.6. IMPRIMACION
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Irrigador
RENDIM.
VR.UNIT.
35,000.00
200.00
175.00
7.56
1.00
8.37
Herramienta menor 5% M. O.
SUBTOTAL
$183.37
2. MATERIALES
DESCRIPCION
UNIDAD
lt
PREC. UNIT.
600.00
CANT.
VR.UNIT.
0.80
480.00
DESPERDICIO %
SUBTOTAL
$480.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
Oficial
15000.00
75.00%
26,250.00
760.00
34.54
Ayudantes
12500.00
75.00%
87,500.00
750.00
116.67
SUBTOTAL
$151.21
$814.57
4. COSTOS INDIRECTO
Administracin, Utilidades e Imprevistos
25%
203.64
$958.00
6. PAVIMENTACION
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
60000.00
10.00
6,000.00
Cilindro
50000.00
10.00
5,000.00
Cilindro neumtico
55000.00
10.00
5,500.00
787.50
1.00
787.50
Herramienta menor 5% M. O.
SUBTOTAL
17,287.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
150000.00
1.20
VR.UNITARIO
180,000.00
DESPERDICIO %
SUBTOTAL
180,000.00
3. TRANSPORTE
MATERIAL
1.30
costo
-
625.00
VR.UNITARO
0.00
0.00
SUBTOTAL
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
10.00
2625.00
Ayudantes
12500.00
75.00%
131,250.00
10.00
13125.00
SUBTOTAL
15,750.00
213,037.50
5. COSTOS INDIRECTOS
Administracin, Utilidades e Imprevistos
25%
53,259.38
266,296.88
6. PAVIMENTACION
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Pulvimezcladora
Herramienta menor 5% M. O.
RENDIM.
VR.UNITARIO
40000.00
60.00
666.67
58.33
1.00
58.33
SUBTOTAL
725.00
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
2300.00
0.35
VR.UNITARIO
805.00
DESPERDICIO %
SUBTOTAL
805.00
3. TRANSPORTE
MATERIAL
Arena
costo
1.8
625.00
VR.UNITARO
1093.75
0.00
SUBTOTAL
1,093.8
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
60.00
437.50
Ayudantes
12500.00
75.00%
43,750.00
60.00
729.17
SUBTOTAL
1,166.67
3,790.42
5. COSTOS INDIRECTOS
Administracin, Utilidades e Imprevistos
25%
947.60
4,738.02
6. PAVIMENTACION
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Compresor
Herramienta menor 5% M.O.
RENDIM.
VR.UNITARIO
38000.00
100.00
380.00
21.88
1.00
21.88
SUBTOTAL
401.88
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
VR.UNITARIO
TRABAJADOR
JORNAL
Ayudantes
PRESTACION JORN.TOTAL
12500.00
75.00%
RENDIM.
43,750.00
VR.UNITARO
100.00
SUBTOTAL
437.50
437.50
839.38
4. COSTOS INDIRECTO
Administracin, Utilidades e Imprevistos
25%
$209.84
1,049.22
6. PAVIMENTACION
6.10 PARCHEO.
UNIDAD:
RIEGO DE LIGA
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
10.94
SUBTOTAL
1.00
VR.UNITARIO
10.94
10.94
2. MATERIALES
DESCRIPCION
Liga, asfalto MC-70
DESPERDICIO %
UNIDAD
Gal
PRECIO UNIT.
2500.00
CANTIDAD
0.20
VR.UNITARIO
500.00
SUBTOTAL
500.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
Ayudantes
PRESTACION JORN.TOTAL
12500.00
75.00%
RENDIM.
21,875.00
VR.UNITARO
100.00
SUBTOTAL
218.75
218.75
729.69
4. COSTOS INDIRECTO
25%
$182.42
912.11
6. PAVIMENTACION
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
60000.00
10.00
6,000.00
Cilindro
50000.00
10.00
5,000.00
Cilindro neumtico
55000.00
10.00
5,500.00
Herramienta menor 5% M. O.
787.50
SUBTOTAL
1.00
$
787.50
17,287.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
150000.00
1.30
VR.UNITARIO
195,000.00
DESPERDICIO %
SUBTOTAL
195,000.00
3. TRANSPORTE
MATERIAL
Mezcla asfaltica en planta.
costo
-
625.00
VR.UNITARO
0.00
SUBTOTAL
4. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
10.00
2625.00
Ayudantes
12500.00
75.00%
131,250.00
10.00
13125.00
SUBTOTAL
15,750.00
228,037.50
5. COSTOS INDIRECTOS
Administracin, Utilidades e Imprevistos
25%
PRECIO UNITARIO AJUSTADO AL PESO
57,009.38
285,046.88
7. SARDINELES Y ANDENES
UNIDAD:
7.1 CONSTRUCCION DE SARDINELES EN CONCRETO DE 2500 PSI INCLUYE JUNTA DE
MADERA
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 5% M. O.
TARIFA / HORA
MANO DE OBRA
RENDIM.
437.50
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Concreto simple de 2500 psi
Formaleta
Juntas
UNIDAD
M
Ml
Un
PRECIO UNIT.
243676.25
750.00
300.00
CANTIDAD
1.10
12.50
12.50
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Oficial
Ayudantes
1
2
JORNAL
PRESTACION JORN.TOTAL
15000.00
75.00%
26,250.00
12500.00
75.00%
43,750.00
RENDIM.
8.00
8.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
7. SARDINELES Y ANDENES
UNIDAD:
7.2 CONSTRUCCION DE BERMA CUNETAS EN CONCRETO DE 2500 PSI INCLUYE JUNTA DE
MADERA
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 5% M. O.
TARIFA / HORA
MANO DE OBRA
RENDIM.
233.33
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Concreto simple de 2500 psi
Formaleta
Juntas
UNIDAD
M
Ml
Un
PRECIO UNIT.
243676.25
750.00
300.00
CANTIDAD
1.02
12.50
12.50
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Oficial
Ayudantes
1
2
JORNAL
PRESTACION JORN.TOTAL
15000.00
75.00%
26,250.00
12500.00
75.00%
43,750.00
RENDIM.
15.00
15.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
COLOMBIA
A DE INGENIERIA CIVIL
OS
M
SI INCLUYE JUNTA DE
VR.UNITARIO
437.50
437.50
VR.UNITARIO
268,043.88
9,375.00
3,750.00
281,168.88
VR.UNITARO
3281.25
5468.75
8,750.00
290,356.38
72,589.09
362,945.47
COLOMBIA
A DE INGENIERIA CIVIL
OS
M
VR.UNITARIO
233.33
233.33
VR.UNITARIO
248,549.78
9,375.00
3,750.00
261,674.78
VR.UNITARO
1750.00
2916.67
4,666.67
266,574.78
66,643.69
333,218.47
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
CANT.
VR.UNIT.
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Seal reglamentaria
Un
PREC. UNIT.
189,080
1.00
189,080.00
DESPERDICIO %
SUBTOTAL
$189,080.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
$189,080.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
factor de incremento por municipio
25%
47,270.00
$236,350.00
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
CANT.
VR.UNIT.
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Seal preventiva
Un
PREC. UNIT.
189,080
1.00
189,080.00
DESPERDICIO %
SUBTOTAL
$189,080.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
$189,080.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
47,270.00
$236,350.00
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
CANT.
VR.UNIT.
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PREC. UNIT.
$ 301,600
1.00
301,600.00
DESPERDICIO %
SUBTOTAL
$301,600.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
$301,600.00
25%
75,400.00
$377,000.00
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
ML
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
CANT.
VR.UNIT.
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
Ml
$ 605
1.00
605.00
DESPERDICIO %
SUBTOTAL
$605.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
VR.UNIT.
SUBTOTAL
TOTAL COSTO DIRECTO
$605.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
151.25
$756.25
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
UN
BIDIRECCIONALES
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNIT.
CANT.
VR.UNIT.
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Un
PREC. UNIT.
8800.00
1.00
8,800.00
DESPERDICIO %
SUBTOTAL
$8,800.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
SUBTOTAL
RENDIM.
VR.UNIT.
$8,800.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
2,200.00
$11,000.00
8. SEALIZACION Y DEMARCACION
ITEM:
UNIDAD:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
RENDIM.
HERRAMIENTA
MANO DE OBRA
SUBTOTAL
VR.UNITARIO
2. MATERIALES
DESCRIPCION
UNIDAD
Conos H= 45 cm.
Un
PRECIO UNIT.
CANTIDAD
1.00
14750.00
VR.UNITARIO
14,750.00
DESPERDICIO %
SUBTOTAL
14,750.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION
JORN.TOTAL
RENDIM.
VR.UNITARO
SUBTOTAL
TOTAL COSTO DIRECTO
14,750.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
3,687.50
$18,437.50
8. SEALIZACION Y DEMARCACION
UNIDAD:
UN
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
SUBTOTAL
VR.UNITARIO
2. MATERIALES
DESCRIPCION
UNIDAD
Conos H= 70 cm.
Un
PRECIO UNIT.
CANTIDAD
1.00
26400.00
VR.UNITARIO
26,400.00
DESPERDICIO %
SUBTOTAL
26,400.00
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION
JORN.TOTAL
RENDIM.
VR.UNITARO
SUBTOTAL
TOTAL COSTO DIRECTO
26,400.00
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
6,600.00
$33,000.00
8. SEALIZACION Y DEMARCACION
UNIDAD:
ITEM:
UN
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
459.38
SUBTOTAL
VR.UNITARIO
1.00
459.38
459.38
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
m3
243676.25
0.07
16,082.63
Kg
2756.00
5.00
13,780.00
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
29,862.63
TRABAJADOR
JORNAL
PRESTACION
JORN.TOTAL
RENDIM.
VR.UNITARO
Obreros
12500.00
75%
65,625.0
10.00
6562.50
Oficial
15000.00
75%
26,250.0
10.00
2625.00
SUBTOTAL
TOTAL COSTO DIRECTO
9,187.5
39,509.51
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
9,877.38
$49,386.88
9. TRANSPORTE
ITEM:
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Volqueta
RENDIM.
25000.00
40.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PREC. UNIT.
CANT.
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTAC.
JORN.TOT.
RENDIM.
SUBTOTAL
TOTAL COSTO DIRECTO
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
factor de incremento por municipio
25%
VR.UNIT.
625.00
$625.00
VR.UNIT.
VR.UNIT.
$625.00
$156.25
$781.25
CAPITULO:
ITEM:
10. VARIOS
10.1 EMPRADIZACION
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 10% M. O.
TARIFA / HORA
MANO DE OBRA
RENDIM.
250.00
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Tierra negra
Cesped
Estacas
UNIDAD
M
M
Un
PRECIO UNIT.
22000.00
1500.00
500.00
CANTIDAD
0.20
1.00
4.00
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Ayudantes
JORNAL
PRESTACION JORN.TOTAL
12500.00
75.00%
87,500.00
RENDIM.
35.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 10% M. O.
Compresor
Volqueta
TARIFA / HORA
MANO DE OBRA
RENDIM.
700.00
38000.00
25000.00
1.00
2.00
15.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Oficial
Ayudantes
1
2
JORNAL
PRESTACION JORN.TOTAL
15000.00
75.00%
26,250.00
12500.00
75.00%
43,750.00
RENDIM.
10.00
10.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 5% M. O.
Compresor
Volqueta
TARIFA / HORA
MANO DE OBRA
1531.25
38000.00
25000.00
RENDIM.
1.00
0.33
15.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Oficial
Ayudantes
1
3
JORNAL
PRESTACION JORN.TOTAL
15000.00
75.00%
26,250.00
12500.00
75.00%
65,625.00
RENDIM.
3.00
3.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Herramienta menor 5% M. O.
TARIFA / HORA
MANO DE OBRA
RENDIM.
46.67
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Plntula puesta en sitio
Corrector de Suelo (Dolomita,compuesto fsforo
Fertilizante (N-P-K) y elementos menores
Pesticidas (Insecticidas, Fungicidas)
UNIDAD
Unidad
Kg
Kg
Cm3
PRECIO UNIT.
800.00
300.00
900.00
43.00
CANTIDAD
1.00
0.10
0.025
0.02
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Obrero
Oficial
2
1
JORNAL
PRESTACION JORN.TOTAL
12500.00
75.00%
43,750.00
15000.00
75.00%
26,250.00
RENDIM.
75.00
75.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Volqueta
Motoniveladora
Compactador
Cargador
TARIFA / HORA
MANO DE OBRA
25000.00
50000.00
43000.00
RENDIM.
50.00
250.00
50.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Geotextil
Tubera de drenaje 2"
Formaleta para muros en tierra armada
UNIDAD
m2
ML
Gl
PRECIO UNIT.
1455.00
8500.00
15000.00
CANTIDAD
4.80
1.10
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Obrero
JORNAL
PRESTACION JORN.TOTAL
12500.00
75.00%
87,500.00
RENDIM.
50.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
10. VARIOS
10.6 SACOS DE TIERRA
1. EQUIPO
DESCRIPCION
TARIFA / HORA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
116.67
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Sacos de lona
UNIDAD
Unidad
PRECIO UNIT.
$ 750
CANTIDAD
1.00
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Obrero
Oficial
2
1
JORNAL
PRESTACION JORN.TOTAL
12500.00
75.00%
43,750.00
15000.00
75.00%
26,250.00
RENDIM.
30.00
30.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
MANO DE OBRA
Herramienta menor 5% M. O.
RENDIM.
140.00
1.00
SUBTOTAL
2. MATERIALES
DESCRIPCION
Poste de madera rolliza
Alambre de Pas
Grapa
UNIDAD
Unidad
ML
Lb
PRECIO UNIT.
$ 4,000
340.00
2000.00
CANTIDAD
0.50
5.00
0.10
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Obrero
Oficial
2
1
JORNAL
PRESTACION JORN.TOTAL
12500.00
75.00%
43,750.00
15000.00
75.00%
26,250.00
RENDIM.
25.00
25.00
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
CAPITULO:
ITEM:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
MANO DE OBRA
RENDIM.
SUBTOTAL
2. MATERIALES
DESCRIPCION
Material Granular D> 2"
UNIDAD
M
PRECIO UNIT.
30000.00
CANTIDAD
1.10
DESPERDICIO %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
SUBTOTAL
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
VR.UNITARIO
$ 250.00
$ 250.00
VR.UNITARIO
$ 4,400.00
$ 1,500.00
$ 2,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 7,900.00
VR.UNITARO
$ 2,500.00
$ 2,500.00
$ 10,650.00
$ 2,662.50
$ 13,312.50
VR.UNITARIO
$ 700.00
$ 19,000.00
$ 1,666.67
$ 21,366.67
VR.UNITARIO
$
$
$
$
$
$
$
$
$
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VR.UNITARO
$ 2,625.00
$ 4,375.00
$ 7,000.00
$ 28,366.67
$ 7,091.67
$ 35,458.33
VR.UNITARIO
$ 1,531.25
$ 115,151.52
$ 1,666.67
$ 118,349.43
VR.UNITARIO
$
$
$
$
$
$
$
$
$
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VR.UNITARO
$ 8,750.00
$ 21,875.00
$ 30,625.00
$ 148,974.43
$ 37,243.61
$ 186,218.04
VR.UNITARIO
$ 46.67
$ 46.67
VR.UNITARIO
$ 800.00
$ 30.00
$ 22.50
$ 0.86
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 853.36
VR.UNITARO
$ 583.33
$ 350.00
$ 933.33
$ 1,833.36
$ 458.34
$ 2,291.70
VR.UNITARIO
$ 500.00
$ 200.00
$ 860.00
$ 1,560.00
VR.UNITARIO
$ 6,984.00
$ 9,350.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 16,334.00
VR.UNITARO
$ 1,750.00
$ 1,750.00
$ 19,644.00
$ 4,911.00
$ 24,555.00
VR.UNITARIO
$ 116.67
$ 116.67
VR.UNITARIO
$ 750.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
VR.UNITARO
$ 1,458.33
$ 875.00
$ 2,333.33
$ 2,450.00
$ 612.50
$ 3,062.50
VR.UNITARIO
$ 140.00
$ 140.00
VR.UNITARIO
$ 2,000.00
$ 1,700.00
$ 200.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 3,900.00
VR.UNITARO
$ 1,750.00
$ 1,050.00
$ 2,800.00
$ 6,840.00
$ 1,710.00
$ 8,550.00
VR.UNITARIO
$ 0.00
VR.UNITARIO
$ 33,000.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 33,000.00
VR.UNITARO
$ 0.00
$ 33,000.00
$ 8,250.00
$ 41,250.00
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Mezcladora
Herramienta menor 1% M.O.
RENDIM.
VR.UNITARIO
8000.00
0.75
10,666.67
175.00
0.75
233.33
SUBTOTAL
10,900.00
2. MATERIALES
DESCRIPCION
UNIDAD
Cemento
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Bto.
21500.00
7.00
150,500.00
Arena lavada
25000.00
0.55
13,750.00
Gravilla
45000.00
0.84
37,575.00
Agua
Lts.
20.00
160.00
3,200.00
DESPERDICIO %
10,251.25
SUBTOTAL
215,276.25
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.50
4038.46
Ayudantes
12500.00
75.00%
87,500.00
6.50
13461.54
SUBTOTAL
TOTAL COSTO DIRECTO
$
$
17,500.0
243,676.25
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
60,919.06
304,595.31
UNIDAD:
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Mezcladora
Herramienta menor 1% M.O.
RENDIM.
VR.UNITARIO
8000.00
0.75
10,666.67
189.58
0.75
252.78
SUBTOTAL
10,919.44
2. MATERIALES
DESCRIPCION
UNIDAD
Cemento
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
Bto.
21500.00
7.50
161,250.00
25000.00
0.60
15,000.00
Gravilla
45000.00
0.76
34,200.00
Agua
Lts.
20.00
170.00
3,400.00
Arena lavada
DESPERDICIO %
10,692.50
SUBTOTAL
224,542.50
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
6.00
4375.00
Ayudantes
12500.00
75.00%
87,500.00
6.00
14583.33
SUBTOTAL
TOTAL COSTO DIRECTO
$
$
18,958.3
254,420.28
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
63,605.07
318,025.35
UNIDAD:
1. EQUIPO
DESCRIPCION
HERRAMIENTA
Mezcladora
Herramienta menor 1% M.O.
2. MATERIALES
DESCRIPCION
Cemento
Arena lavada
Gravilla
Agua
TARIFA / HORA
MANO DE OBRA
8000.00
189.58
RENDIM.
0.75
0.75
10,666.67
252.78
SUBTOTAL
10,919.44
UNIDAD
Bto.
M
M
Lts.
DESPERDICIO %
PRECIO UNIT.
21500.00
25000.00
45000.00
20.00
CANTIDAD
VR.UNITARIO
8.50
182,750.00
0.67
16,750.00
0.67
30,150.00
180.00
3,600.00
5
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Oficial
Ayudantes
1
4
JORNAL
PRESTACION JORN.TOTAL
15000.00
75.00%
26,250.00
12500.00
75.00%
87,500.00
11,662.50
244,912.50
RENDIM.
VR.UNITARO
6.00
4375.00
6.00
14583.33
SUBTOTAL
TOTAL COSTO DIRECTO
VR.UNITARIO
$
$
18,958.3
274,790.28
4. COSTOS INDIRECTOS
Administracion, Utilidades e imprevistos
25%
68,697.57
343,487.85
UNIDAD:
11.4 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 0 A 7.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
2515.63
1.00
2,515.63
Vibrador
6000.00
0.75
8,000.00
SUBTOTAL
10,515.63
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
35000.00
VR.UNITARIO
1.10
279,862.31
1.00
35,000.00
DESPERDICIO %
SUBTOTAL
314,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
4.00
6562.50
Ayudantes
12500.00
75.00%
175,000.00
4.00
43750.00
SUBTOTAL
TOTAL COSTO DIRECTO
50,312.50
375,690.43
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
93,922.61
469,613.04
UNIDAD:
4.2 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 7,1 A 14.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
2812.50
1.00
2,812.50
Vibrador
6000.00
0.56
10,714.29
13,526.79
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
47000.00
VR.UNITARIO
1.1
279,862.31
1.00
47,000.00
DESPERDICIO %
SUBTOTAL
326,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
12500.00
75.00%
21,875.00
3.50
6250.00
Ayudantes
12500.00
75.00%
175,000.00
3.50
50000.00
SUBTOTAL
TOTAL COSTO DIRECTO
56,250.00
396,639.09
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
99,159.77
495,798.86
UNIDAD:
4.3 CONCRETO DE 3000 PSI PARA PLACAS Y VIGAS , LONGITUD DE 14,1 A 21.0 Mts.
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
RENDIM.
VR.UNITARIO
3354.17
1.00
3,354.17
Vibrador
6000.00
0.38
15,789.47
19,143.64
SUBTOTAL
2. MATERIALES
DESCRIPCION
UNIDAD
Formaleta
Gl
PRECIO UNIT.
CANTIDAD
254,420.28
61000.00
VR.UNITARIO
1.10
279,862.31
1.00
61,000.00
DESPERDICIO %
SUBTOTAL
340,862.31
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
3.00
8750.00
Ayudantes
12500.00
75.00%
175,000.00
3.00
58333.33
SUBTOTAL
TOTAL COSTO DIRECTO
67,083.33
427,089.28
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
106,772.32
533,861.60
UNIDAD:
4.4 CONCRETO DE 3000 P.S.I PARA BARANDAS, INCLUYE REFUERZO , SEGUN MODELO
DEL FNCV . ( 1 M EQUIVALE A 16.67 ML DE BARANDA)
1. EQUIPO
DESCRIPCION
TARIFA / HORA
HERRAMIENTA
MANO DE OBRA
Herramienta menor 1% M. O.
RENDIM.
1837.50
SUBTOTAL
VR.UNITARIO
1.00
1,837.50
1,837.50
2. MATERIALES
DESCRIPCION
UNIDAD
PRECIO UNIT.
CANTIDAD
VR.UNITARIO
254,420.28
1.10
279,862.31
Kg.
3,001.00
85.02
255,145.02
Kg.
2,756.00
83.52
230,181.12
Tabla burra
Ml
2500.00
33.33
83,325.00
Repisa
Ml
3500.00
25.00
87,500.00
Alambre No. 18
Kg
2200.00
2.00
4,400.00
Puntilla
Lb.
1800.00
8.00
14,400.00
DESPERDICIO %
SUBTOTAL
954,813.45
3. MANO DE OBRA
TRABAJADOR
JORNAL
PRESTACION JORN.TOTAL
RENDIM.
VR.UNITARO
Oficial
15000.00
75.00%
26,250.00
0.50
52500.00
Ayudantes
12500.00
75.00%
65,625.00
0.50
131250.00
SUBTOTAL
TOTAL COSTO DIRECTO
183,750.00
1,140,400.95
4. COSTOS INDIRECTOS
Administracion, Utilidades e Imprevistos
25%
285,100.24
$1,425,501