Sei sulla pagina 1di 1

Proposed KPIs for Preliminary Acceptance

The following table lists the proposed KPIs for Preliminary Acceptance.

Proposed KPIs for Final Acceptance (Stability Acceptance, Optional)


The following table lists the proposed KPIs for Final Acceptance.
Cluster and Test Route
The following contents present recommendation for Cluster Optimization and the
selectionof Drive Test Route for LTE project.
Cluster Optimization
Performing optimization/acceptance per Cluster is recommended. Cluster means a
group of sites (Normally 20-40 sites) which are geographically neighbor and all the
eNodeBs of thistest cluster should be integrated and on air, along with surrounding
neighbor cells, but theactual sites number of per cluster should be flexible to allow a
faster rollout and acceptance

Potrebbero piacerti anche