Sei sulla pagina 1di 1

375-1374

375-1057

ET

EE
P
T4
0.4 K292
k V 6-L
6
I n O VD
B
per -F0
atio 6
n
!

ST
!

375-1056

4W

AY

375-1383

P
0.4K285
k V 1AI n O LV D
p e r B-F
atio 02
n

2775900

!
!

NOC

P
11 K285
kV 1 A
In O -PK
per 292
a 6A
! tio
! n

375-1384

2775900

)
E

375-1327

375-1052

1071029

COMMUNITY : AL BARSHA THIRD

375-1024

RE

ST

375-1324

P
11 K! 3! 66
kV ! 1 A
In O -PK
!!
per 299
atio 6A
n

375-1373

44

375-1051

375-1321

PK
0.4 1977
k V A-L
In O V D
p e r B1-F
atio 08
n PK
!
0.4 1977
k V A-L
In O V D
p e r B1-F
atio 08
n

375-1916

PK
0.4 1977
!! kV BIn OLVD
p e r B1-F
atio 05
n
! !

375-1050

487100
375-1058

375-1049

PK
0.4 1977
k V B-L
In O V D
p e r B1-F
atio 04
n

487000

375-1880

SUBSTATION NOT REQUIRED


ADD. LOAD TO A/C#521-01086-1
REVISION OF NOC#1041831 LOAD INCREASED

ST

RE

375-1022

375-1922

MM

487000

! ! ! !

P
11 K230
kV 9 A
In -PK
pe 200! in 'Normal growth &
Revalidation of NOC (Load less than 5000 KW) of projectsOlocated
all major projects (including the normal growth area projects ofratload
ion9!B 5000KW & above)
area is not required within 2 (two) years and 1 (one) year respectively from the date
of issue for submission of application
375-2201"Getting Electricity", subject to no increase
2W
in load & change of power requirement date.
AY !
!

375-1491

ET

25

375-1023

375-2107

487100

SUPPLY FROM DE-E-01-PK001977-B-1-1


EXISTING LOAD (REF. E/1366/2000) INCLUDED
AND TO BE DIVERTED TO PANEL-B

KWH METER LOCATION SHOWN

NO OBJECTION
PLEASE REFER TO SAFETY PRECAUTIONS
& CONDITIONS ATTACHED
THIS NOC PERMITS TO WORK WITHIN THE PLOT
LIMIT ONLY

WARNING
ELECTRIC UNDERGROUND CABLES (REFER FOR REPRESENTATION)
ARE SHOWN AT APPROXIMATE LOCATIONS ON THIS DOCUMENT. IT
IS LIKELY THAT ELECTRIC CABLES ARE PASSING THROUGH THE
PROPOSED WORKING AREA. IT IS THE RESPONSIBILITY OF
CONTRACTOR TO LOCATE DEWA ELECTRIC CABLES BY EXCAVATION
USING HAND SHOVEL ONLY. PRIOR TO COMMENCEMENT OF ANY
EXCAVATION/DRILLING WORK IN THE VICINITY OF THE PROPOSED
WORK AREA, PLEASE INFORM DEWA (ED) BY (TEL: 04-398-7106
FAX: 04-398-4754) 48 WORKING HOURS PRIOR TO COMMENCEMENT
OF WORK TO DEPUTE DEWA-SUPERVISOR TO SHOW ELECTRIC
CABLES IN WORK AREA/PLOT. DEWA WILL NOT BE RESPONSIBLE
FOR ACCIDENT CAUSED DUE TO ELECTRIC CABLES IN THIS AREA.
CHARGES WILL BE MADE TO THE CONTRACTOR FOR ANY DAMAGE
TO DEWA PROPERTY AS PER ACT (2) 1994 OF DUBAI GOVERNMENT.
PLEASE REFER CAREFULLY TO ALL THE NOTES & CONDITIONS
INCLUDING "SAFETY PREACAUTIONS AND CONDITIONS TO BE
OBSERVED" NOTES ON THE REVERSE OF THIS DOCUMENT
OR ATTACHMENTS. "ENSURE THIS DOCUMENT IS AVAILABLE WITH
SITE
PERSONNEL
AT
ALL
TIMES"

CONTRACTOR MUST DEMARCATE THE PLOT / PROJECT AREA AND LOCATE DEWA SERVICES USING CABLE
DETECTOR AND DEWA PATROLLING SECTION (TEL. NO.: 04-5066565, FAX: 04-5066791) TO BE INFORMED
ACCORDINGLY FOR NECESSARY CHECKING, PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION WORK
(MOBILIZATION, INSTALLATION OF MACHINERIES / EQUIPMENTS , EXCAVATION, ETC.)

NOC NO : 1071029 , BUILDING

VALIDITY: 6 (SIX) MONTHS ONLY FROM DM NOC REF. :


WEB REF. :
THE DATE OF ISSUE

A4

OWNER : TARIQ MAKKI HASSAN MOHAMMED MAKKI


PLOT NO : 375-1327 / AL BARSHA THIRD
LOAD : 165 KW
SCALE 1 : 1000
DATE OF RECEIVED : 11-Dec-2013
DATE OF ISSUE : 11-Dec-2013
CONSULTANT/CONTRACTOR : EMIRATES COAST COANTG
SHEET NO : 1 OF 1
DESIGNED BY : ASIF KHAN
PREPARED BY : ASIF_KHAN
CHECKED BY : ABDUL SALAM KHAN
APPROVED BY: Dy Manager (NOC) / M(P) / SM(CS)

Potrebbero piacerti anche