Sei sulla pagina 1di 4

AO

1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1971
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972
1972

Ao
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995

MES
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC

Vol. Def.
(MMC)
51.94
52.78
44.59
49.72
65.88
70.16
54.82
35.28
36.98
50.19
47.26
55.98
59.32
29.75
33.17
61.27
39.66
43.58
50.18
59.32
49.62
68.43
57.44
45.61
39.78

NDIAS
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

Q (M3/S)
58.6
62.3
60.5
49.7
31.4
17.0
9.6
7.3
8.5
20.8
32.4
45.6
61.4
73.8
64.2
50.1
30.5
16.8
10.2
8.2
9.0
12.7
28.3
42.9

Qd (M3/S)
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0

Q.DEF (M3/S) VOL.DEF (MM3)

5.4
7.7
6.5

14.46
20.62
16.85

4.8
6.8
6.0
2.3

12.86
18.21
15.55
6.16

SE TRATARA DE DETERMINAR EL VOLUMEN DE EMBALSE REQUERIDO


QUE PERMITA GARANTIZAR LA SATISFACCION DE LA DEMANDA
POR UN CIERTO PORCENTAJE DE TIEMPO ESTABLECIDO (P. EJ.
EL 95% DEL TIEMPO)
MAXIMO

77.18

MMC

AL 95% DE PROBABILIDAD LE CORRESPONDE - DE ACUERDO A LAS


TABLAS DE DISTRIBUCION NORMAL - UN VALOR Z = 1.645
CONSECUENTEMENTE, EL VOLUMEN DE EMBALSE REQUERIDO SER:
VOL.EMB. =

67.384

MMC

1996
1997
1998
1999
2000
Media
Desv. Est.

51.74
33.97
48.75
55.15
60.27
50.09
10.52

MMC
MMC

VOL.AC. (MM3)

51.94

52.78

E EMBALSE REQUERIDO
N DE LA DEMANDA
TABLECIDO (P. EJ.

- DE ACUERDO A LAS
OR Z = 1.645

ALSE REQUERIDO SER:

Potrebbero piacerti anche