SITE ID
SITE NAME
SITE TPYE
:
:
:
Prime
Eligible
Hereby stated description and item below refer to the documents attached have been approved for
construction:
Non Eligible
Table of Contents
No.
1
ENodeB ATP
Acceptance Test Procedure for eNodeB
A. Bill of Quantity (BoQ)
B. Functional Item Test
C. Commissioning Report
D. Integration Test
E. Punch List Summary
AS BUILT DOCUMENTATION
A. Commissioning Capture
B. Installation Photo Documentation
C. As Built Drawing (hardcopy & softcopy)
Submitted by
PT Huawei Tech
Investment
HTI
CHECKED
Subcon
REMARKS
Auto Cad
Approved by
FOC PT Huawei Service
Name
Date
SIGNATURE
Acceptance Manual
HUAWEI
Page , Total
CONTENTS:
1. Site Information
2. Certificate of Acceptance
3. Material List Delivery
4. Functional Item Test
5. Commissioning Report
6. ME & Power System
7. Civil Works
8. Integration Test
9. Installation Photo Documentation
10.
Punch List
1. Site Information
SITE SUMMARY
Site Name/ Site ID
Site Address
Coordinate
Site Type
Acceptance Manual
HUAWEI
Page , Total
Google Earth
Google Map
Acceptance Manual
HUAWEI
Page , Total
2. Certificate of Acceptance
CERTIFICATE
of
Preliminary Acceptance
It is agreed that, from
to
, the
Acceptance Manual
HUAWEI
Page , Total
FOC Engineer
FOP Engineer
FOC Supervisor
Name :
Name :
Name :
Name :
Date :
Date :
Date :
Date :
Acceptance Manual
HUAWEI
Page , Total
Table of Contents
T01 Hardware Acceptance Test...................................................................................................
T01-01 Hardware Acceptance Test..............................................................................................
T01-0101 Cabinet.........................................................................................................................
T01-0102 Power Cables...............................................................................................................
T01-0103 Antennas and Feeders.................................................................................................
T01-0104 Power-On Check of the BTS........................................................................................
T02 Operation and Maintenance Test..........................................................................................
T02-01 Operation and Maintenance Test.....................................................................................
T02-0101 Login Management......................................................................................................
T02-0102 Cell Management.........................................................................................................
T03 Alarm Management Test........................................................................................................
T03-01 Alarm Management Test..................................................................................................
T03-0101 Query the current Fault Alarm......................................................................................
T03-0102 Web Service.................................................................................................................
Acceptance Manual
HUAWEI
Page , Total
Cabinets
Objective
Verify that the cabinets and modules are properly installed.
Network diagram
None
Prerequisites
The cabinets and modules are installed.
Test Procedure
Expected result
Check whether the equipment is
Result
Remarks
None
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
HUAWEI Confidential
Test Result
Pass
Fail
NA
Pass
Fail
NA
Pass
Fail
NA
Check that the installation of power supply and the power cables meet the engineering
requirements.
Network diagram
None
Prerequisites
1
Test procedure
Expected result
Result/Valu
e
Test result
Pass
NA
Fail
Pass
NA
Fail
4
Check the input
and output power.
Pass
NA
Fail
Pass
NA
Fail
5
Check all the
grounding cable route from
its equipment to the busbar
Pass
NA
Fail
6
Check all the
grounding screws and bolts
are fastened tightly
Pass
NA
Fail
Remarks
None
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
HUAWEI Confidential
HUAWEI Confidential
Check that the installation of sectoral antennas and feeders complies with the
engineering requirements.
Network diagram
None
Prerequisites
7
Test procedure
Expected result
9
Measure the azimuth angels
of antenna.
The azimuth
angles of antennas
comply with the
requirements
specified in the
design files. The
error of the azimuth
angle should be
not more than 5
degrees.
10
tilt.
11
Measure all sectoral
antennas height from ground level
12
Check is there any obstacles
on the front of sectoral antennas.
Result/Valu
e
Test result
Pass
NA
Plan:
Sector 0:
Sector 1:
Sector 2:
Actual:
Sector 0:
Sector 1:
Sector 2:
Plan:
Sector 0:
Sector 1:
Sector 2:
Actual:
Sector 0:
Sector 1:
Sector 2:
Plan:
Sector 0:
Sector 1:
Sector 2:
Actual:
Sector 0:
Sector 1:
Sector 2:
Sector 0:
Sector 1:
Sector 2:
There are no
obstacles on the
front of all sectoral
antennas. All the
sectoral antennas
HUAWEI Confidential
Fail
Pass
Fail
NA
(need
RF
attachment)
Pass
Fail
NA
(need
RF
attachment)
Pass
NA
Fail
Pass
NA
Fail
The waterproof
treatment of joints
complies with the
specified
requirements.
Waterproof tapes
are first wrapped
from inside to
outside. Then, the
electrical insulating
tapes are wrapped.
The waterproof
curves treatment is
applied to the
engineering
requirements.
Pass
NA
Fail
Pass
NA
Fail
15
Check the appearance of
feeders and jumpers. In addition,
check the labels of cables.
Feeders and
jumpers are
arranged in good
order. Both ends
of the cables are
clearly and
correctly labeled.
Pass
NA
Fail
16
Check the label of all the
sectoral antennas
All sectoral
antennas must be
labeled with its
sector name
Pass
NA
Fail
17
Check whether the antenna
mountings are matched with the
engineering requirements
The antenna
mounting must
matched with the
engineering
requirement such
as tower leg form
and technical site
survey result.
Pass
NA
Fail
14
Check the grounding
positions and layout of CPRI cable,
and measure the minimum bending
radius of CPRI cable.
HUAWEI Confidential
Remarks
None
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
Verify that the BTS is provided with power supply, and the BBU and RRU can be
normally powered on.
Networking Diagram for the Test
None.
Prerequisites
18
The hardware installation of the BBU and RRU is complete and correct.
19
The cable connection of the BBU and RRU is complete and correct.
Expected Result
The BBU is
normally powered
on, and the RUN
indicator is normal.
(1)
Open the power switch of the
BBU.
(2)
Result
Test result
Pass
NA
Fail
Pass
NA
Fail
20
check.
Pass
NA
Pass
NA
Fail
21
Do as follows to conduct the
power-on check of the RRU:
(1)
Open the external power switch
of the RRU.
HUAWEI Confidential
Fail
(2)
Observe the RUN indicator
inside the RRU maintenance cavity.
If the RUN indicator is normal,
the RRU is normally powered on.
Then, go to the next step.
22
Log in BTS through the OM
system of the BTS. Run the DSP BRD;
command to check the states of the
BBU and RRU.
The corresponding
boards are in the
normal state.
Refer
to
commissioni
ng report (5)
point 11
23
If the test result is abnormal,
troubleshoot the fault and then power
on the BBU and RRU again. If the test
result is normal, the test is finished.
Pass
NA
Fail
Pass
NA
Fail
Remarks
The RRU has no power switch, and it can be powered on and off through an external
power switch.
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
Check whether a user responsible for network maintenance has the basic authority.
Network diagram
None
Prerequisites
24
The BTS has passed the system commissioning and is operational.
25
The tester has the user name and password to log in to the system.
26
The tester is familiar with the maintenance IP address of the BTS to be tested. The IP
address of the BTS to be tested is pinged.
Test procedure
Expected result
HUAWEI Confidential
Result/Valu
e
Test result
Pass
NA
Fail
Pass
NA
Fail
28
Enter the wrong user name
and password to log in the BTS.
(1)
In the User Login dialog box,
enter the wrong user name or
password again.
(2) Click Login.
29
Enter the correct user name
and password to log in the BTS.
(1)
In the User Login dialog box,
enter the correct user name and
password again.
(2)
Pass Fail
NA
Pass
NA
Fail
Click Login.
Remarks
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
HUAWEI Confidential
31
The Operation and Maintenance system of the BTS has logged in to the BBU that connects
to the tested RRU.
32
Procedure
Expected Result
Result
Pass Fail
NA
Pass Fail
NA
The deactivation
state of a sector
can be queried.
Test result
Pass
NA
Fail
Pass
NA
Fail
Pass
NA
Fail
Remarks
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
HUAWEI Confidential
None
Prerequisites
33
34
You can log in to the BBU to be tested through the local network port.
35
36
Test procedure
Expected result
(1)
Run MML commands to
deactivate cell.
(2)
Log in the BBU in WEBUI and
open the alarm window.
View the information in the alarm
window.
(1)
Double-click the alarm that is
just generated.
(2)
View the information on this
alarm in the displayed Alarm Detailed
Information dialog box.
(3)
Click Close in the Alarm Details
dialog box. The Alarm Details dialog
box is closed.
Result
Test result
Pass
NA
Fail
Pass
NA
Fail
The following
information can be
queried:
Alarm ID
Alarm name
Alarm
severity
Occurrence
time
Recovery
time
Fault locating
Alarm type
Remarks
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
HUAWEI Confidential
None
Prerequisites
37
38
The UE enters the network, and the service flows are established.
39
The connection between the host and the UE is established. The host obtains the IP address.
40
The WEB server works properly and the DNS configuration is ready.
Test procedure
Expected result
11
The browsing is
fluent.
Result
Test result
Pass
NA
Fail
Remarks
To attach emphasis, only key data configurations are described in the prerequisites.
Basic data configuration is not described in this document.
Test result and signature
Huawei Representative
Customer Representative
Signature:__________________
Signature:__________________
Date:______________________
Date:______________________
5. Commissioning Report
HUAWEI Confidential
NO
Items
Status
Pass
Fail
NA
attach capture
LST VLANMAP
Pass
Fail
NA
attach capture
LST DEVIP
Pass
Fail
NA
attach capture
LST SCTPLINK
Pass
Fail
NA
attach capture
LST IPPATH
Pass
Fail
NA
attach capture
LST OMCH
Pass
Fail
NA
attach capture
LST IPRT
Pass
Fail
NA
attach capture
DSP S1INTERFACE
Pass
Fail
NA
attach capture
LST SECTOR
Pass
Fail
NA
attach capture
10
LST CELL
Pass
Fail
NA
attach capture
11
DSP BRD
Pass
Fail
NA
attach capture
12
DSP BRDVER
Pass
Fail
NA
attach capture
13
LST SOFTWARE
Pass
Fail
NA
attach capture
14
LST ALMAF
Pass
Fail
NA
attach capture
15
ENGINEERING ALARM
Pass
Fail
NA
attach capture
18
Pass
Fail
NA
attach capture
Pass
Fail
NA
attach capture
Pass
Fail
NA
attach capture
21
STR VSWRTEST
PING = USE IP SOURCE AND DESTINATION FROM
LST SCTPLINK
PING = USE IP SOURCE AND DESTINATION FROM
LST IPPATH
PING = USE IP SOURCE AND DESTINATION FROM
LST OMCH
Pass
Fail
NA
attach capture
22
Pass
Fail
NA
attach capture
19
20
Remark
Items
Status
Remark/Value
Rectifier Cabinet
1
OK
NOK NA
OK
OK
NOK NA
NOK NA
OK
NOK NA
with photo
OK
NOK NA
with photo
OK
NOK NA
with photo
5
6
HUAWEI Confidential
with photo
with photo
with photo
specification
Cable distribution meet with current carrying capacity
and XL specification
End cable termination connected to MCB must use very
less*)
Jumpering MCB line (if any) must be connected
properly refer to XL specification
OK
NOK NA
OK
NOK NA
OK
NOK NA
OK
NOK NA
OK
NOK NA
with photo
OK
NOK NA
with photo
OK
NOK NA
with photo
OK
NOK NA
OK
NOK NA
Batteries
OK
NOK NA
16
Batteries undamaged
OK
NOK NA
with photo
17
OK
NOK NA
with photo
18
OK
NOK NA
with photo
19
OK
NOK NA
with photo
20
OK
NOK NA
OK
NOK NA
with photo
OK
NOK NA
with photo
7
8
9
10
11
12
13
14
15
21
22
with photo
with photo
with photo
OK
NOK NA
with photo
24
OK
NOK NA
with photo
OK
NOK NA
with photo
OK
NOK NA
with photo
25
Incoming Voltage (indoor cabinet)
26
7. Civil works
NO
1
2
3
4
5
Items
Status
Outdoor Foundation
Foundation is constructed as per The CME-ENG
Drawing
Inspection has been done to the concrete foundation
and No Crack were found
OK
NOK NA
OK
NOK NA
OK
OK
NOK NA
NOK NA
OK
NOK NA
OK
NOK NA
/____ mtr.
HUAWEI Confidential
Remark/Value
with photo
OK
NOK NA
OK
NOK NA
OK
NOK NA
OK
NOK NA
OK
NOK NA
10
OK
NOK NA
11
OK
NOK NA
OK
NOK NA
with photo
with photo
OK
NOK NA
with photo
OK
NOK NA
14
with photo
15
OK
NOK NA
with photo
16
OK
NOK NA
with photo
OK
NOK NA
OK
NOK NA
OK
NOK NA
6
7
8
9
12
13
19
with photo
with photo
with photo
with photo
with photo
8. Integration Test
SITE :
SITE CONFIG:
DATE:
Cell 2
Cell 3
Test Item
Browsing
Speed Test
CSFB
Browsing
Speed Test
CSFB
Browsing
Speed Test
CSFB
Pass
HUAWEI Confidential
Fail
Remarks
Capture evidence
Capture evidence
Capture evidence
Capture evidence
Capture evidence
Capture evidence
HUAWEI Confidential
10. Punchlist
Punch List
Site ID
Site Name
No.
Description
HUAWEI Confidential
PIC
Date Cleared**
____________________
____________________
Date
Date
HUAWEI Confidential