PROYECTO : INSTALACIN Y AMPLIACIN DE LA CAPACIDAD DE SERVICIO DE EDUCACIN EN LA I.E.P. 16527 - ALTAMIZA, DISTRITO DE SAN
JOSE DE LOURDES, SAN IGNACIO - CAJAMARCA
Localidad: Altamiza
SAN IGNACIO
CAJAMARCA
MES 2
3.00
MOVIMIENTO DE TIERRAS
4.00
4,060.26
5.00
40,079.13
6.00
8.00
PISOS Y PAVIMENTOS
9.00
TOTAL
11,601.75
TRABAJOS PRELIMINARES
MES 4
626.09
2.00
7.00
MES 3
626.09
7,391.58
7,391.58
4,060.26
60,118.69
20,039.56
3,446.16
120,237.38
3,446.16
10,545.87
6,892.31
10,545.87
7,280.04
21,091.74
7,280.04
14,560.08
3,043.50
CARPINTERIA METALICA
3,043.50
1,893.16
6,087.00
1,893.16
2,197.73
12.00 PINTURA
2,000.00
2,197.73
3,766.22
2,150.16
4,766.22
4,150.16
455.68
3,786.31
455.68
MODULO 2: 03 AULAS
1.00
OBRAS PPRELIMINARES
2.00
TRABAJOS PRELIMINARES
3.00
MOVIMIENTO DE TIERRAS
4.00
5,980.86
5.00
90,872.46
6.00
7.00
8.00
PISOS Y PAVIMENTOS
9.00
CARPINTERIA METALICA
0.00
909.13
909.13
10,480.36
10,480.36
5,980.86
90,872.46
181,744.91
2,809.24 2,809.24
2,809.24
8,427.73
31,099.89
6,459.65
111.00
6,459.65
2,788.00
2,788.00
424.71
1,538.79
3,793.94
12.00 PINTURA
13.00 INSTALACIONES ELECTRICAS
6,459.65
2,788.00
2,916.96
677.26
31,099.89
19,378.95
8,364.00
424.71
1,538.79
849.42
3,077.57
3,793.94
7,587.87
5,833.92
677.26
LOSA DEPORTIVA
1.00
OBRAS PPRELIMINARES
2.00
TRABAJOS PRELIMINARES
3.00
MOVIMIENTO DE TIERRAS
4.00
1,251.12
11,209.19
44,774.78
1,251.12
11,209.19
44,774.78
2,502.23
22,418.37
89,549.56
PROYECTO : INSTALACIN Y AMPLIACIN DE LA CAPACIDAD DE SERVICIO DE EDUCACIN EN LA I.E.P. 16527 - ALTAMIZA, DISTRITO DE SAN
JOSE DE LOURDES, SAN IGNACIO - CAJAMARCA
4,400.00
CARPINTERIA METALICA
1,155.00
6.00
PINTURA
CERCO PERIMETRICO
1.00
OBRAS PRELIMINARES
2.00
TRABAJOS PRELIMINARES
3.00
MOVIMIENTO DE TIERRAS
4.00
4,400.00
1,155.00
1,436.64
1,436.64
16,379.35
16,379.35
56,283.17
56,283.17
66,859.28
66,859.28
5.00
6.00
14,971.53
14,971.53
7.00
10,897.62
10,897.62
8.00
CARPINTERIA METALICA
9.00
VEREDAS
133,718.55
2880.00
2,880.00
13,767.26
13,767.26
10.00
EQUIPAMIENTO
MOBILIARIO
37,911.96
37,911.96
EQUIPO DE COMPUTO
94,720.00
94,720.00
COSTO DIRECTO
174,810.86
247,605.08
304,978.13
268,024.33
995,307.40
13,984.87
19,808.41
24,398.25
21,441.95
79,624.59
UTILIDAD 7%
12,236.76
17,332.36
21,348.47
18,761.70
69,671.52
SUB TOTAL
201,032.48
284,745.85
350,724.85
308,227.98
1,144,603.51
IGV
36,185.85
51,254.25
63,130.47
55,481.04
206,028.63
VALOR REFERENCIAL
237,218.33
336,000.10
413,855.32
363,709.02
1,350,632.14
5,025.81
6,190.13
7,624.45
6,700.61
TOTAL MENSUAL
242,244.14
342,190.23
421,479.78
370,409.62
1,379,247.23
TOTAL ACUMULADO
242,244.14
584,434.37
1,005,914.15
1,111,813.58
1,379,247.23
17.56%
17.56%
24.81%
42.37%
30.56%
72.93%
27.07%
100.00%
SUPERVISION 2.5%
AVANCE MENSUAL
AVANCE ACUMULADO
28,615.09