ITEM
DISCRIMINAO
QUANT.
QUANT
UN.
UN
CUSTO
MO-DEOBRA
CUSTO
MATERIAL
CUSTO
UNITRIO
MO
MAT
CUSTO
CUSTO TOTAL
01.01.00
SERVIOS PRELIMINARES
01.01.01
75.00
0.47
0.00
0.47
12,720.58
35.25
01.01.02
12.00
16.54
0.00
16.54
198.48
01.01.03
9.00
4.14
0.00
4.14
37.26
01.01.04
3.00
9.93
0.00
9.93
29.79
01.01.05
38.00
16.74
0.00
16.74
636.12
01.01.06
18.00
9.93
0.00
9.93
178.74
01.01.07
51.00
11.68
0.00
11.68
595.68
01.01.08
71.50
18.51
0.00
18.51
1,323.47
01.01.09
71.50
13.90
0.00
13.90
993.85
01.01.10
ALUGUEL CONTAINER/ESCRIT INCL INST ELET LARG=2,20 COMP=6,20M ALT=2,50M CHAPA ACO C/NERV
TRAPEZ
FORRO
C/ISOL
TERMO/ACUSTICO
CHASSIS
REFORC
PISO
COMPENS
NAVAL
EXC
TRANSP/CARGA/DESCARGA
2.00
ms
0.00
359.64
359.64
719.28
01.01.11
ALUGUEL CONTAINER/SANIT C/4 VASOS/1 LAVAT/1 MIC/4 CHUV LARG=2,20M COMPR=6,20M ALT=2,50M
CHAPAS ACO C/NERV TRAPEZ FORRO C/ISOL TERMO-ACUST CHASSIS REFORC PISO COMPENS NAVAL INCL
INST ELETR/HIDRO-SANIT EXCL TRANSP/CARGA/DESCARGA
2.00
ms
0.00
559.04
559.04
1,118.08
01.01.12
40.00
0.00
127.89
127.89
5,115.60
01.01.13
6.00
3.83
286.00
289.83
1,738.98
02.00.00
ARQUITETURA
02.01.00
PAREDES E VEDAES
02.01.01
ALVENARIA TIJOLO FURADO 10X20X20CM, 1/2 VEZ, C/ ARGAMASSA DE CIM /SABRO, E JUNTAS DE 1,0CM
02.01.02
02.02.00
ESQUADRIAS
02.02.01
PEM - PORTA PARA SADA DE EMERGNCIA TIPO CORTA-FOGO, DE ABRIR, EM CHAPA #16, COM DUAS
FOLHAS, CONJUNTO MEDINDO 1,60X2,50m, INCLUSIVE BARRA ANTI-PNICO, FECHADURAS E DOBRADIAS
02.03.00
VIDROS E ESPELHOS
02.03.01
02.04.00
02.04.01
02.04.02
02.05.00
REVESTIMENTOS DE PISO
02.05.01
6.00
100.00
161.60
261.60
1,569.60
02.05.02
CONTRAPISO EM ARGAMASSA TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 4CM, PREPARO MANUAL INCLUSO
ADITIVO IMPERMABILIZANTE TIPO SIKA OU EQUIVALENTE
30.00
8.00
9.12
17.12
513.60
02.05.03
38.00
12.66
17.90
30.56
1,161.28
02.05.04
PISO EXTERNO - CALADA EM CIMENTO DESEMPENADO COM JUNTAS PLSTICA 17X3MM A CADA METRO
ESPESSURA 7MM
18.00
7.08
16.91
23.99
431.82
02.05.05
PISO INTERNO INDUSTRIAL ALTA RESISTENCIA ESPESSURA 8MM, INCLUSO JUNTAS DE DILATACAO
PLASTICAS E POLIMENTO MECANIZADO
3.00
6.06
40.59
46.65
139.95
9.00
19,221.13
QUANT
UN
MO
MAT
CUSTO
457.12
12.00
15.15
17.45
32.60
391.20
0.20
9.60
320.00
329.60
65.92
QUANT
7.00
QUANT
3.00
QUANT
UN
und
UN
m
UN
20.00
9.00
QUANT
UN
MO
MAT
194.32
MO
1007.00
MAT
20.36
MO
72.54
MAT
10.00
10.00
MO
9.68
38.66
MAT
CUSTO
1,201.32
CUSTO
92.90
CUSTO
19.68
48.66
CUSTO
8,409.24
8,409.24
278.70
278.70
831.54
393.60
437.94
4,138.00
02.05.06
PISO INTERNOS EM CERMICA 20X20CM, EXTRA, INCLUSO ARGAMASSA COLANTE E REJUNTE COM CIMENTO
BRANCO
02.06.00
REVESTIMENTO DE PAREDES
02.06.01
CHAPISCO PARA PAREDE INTERNA COM ARGAMASSA DE CIMENTO E AREIA, TRAO 1:3, esp.=5mm
15.00
1.52
4.20
5.71
85.65
02.06.02
15.00
4.55
13.57
18.11
271.65
02.07.00
PINTURA
02.07.01
02.07.02
QUANT
QUANT
UN
UN
9.09
MO
26.66
MAT
MO
MAT
35.75
CUSTO
CUSTO
321.75
357.30
4,707.48
196.00
2.00
9.14
11.14
78.00
2.00
3.78
5.78
450.84
02.07.03
93.51
2.00
11.58
13.58
1,269.93
02.07.04
PINTURA COM TINTA BASE DE BORRACHA CLORADA, COM P FOTOLUMINESCENTE PARA BASE DE
EXTINTORES
49.00
2.00
11.58
13.58
665.42
02.07.05
15.00
2.00
7.19
9.19
137.85
02.08.00
ACABAMENTOS E ARREMATES
02.08.01
03.00.00
03.01.00
QUANT
03.01.01
18
31.15
107.41
138.56
03.01.02
19.26
66.42
85.68
771.14
03.01.03
236
16.99
58.60
75.59
17,840.18
03.01.04
9.20
31.71
40.91
122.72
03.01.05
un
6.84
23.60
30.44
152.22
03.01.06
un
13.14
45.30
58.44
58.44
03.01.07
un
5.24
18.07
23.31
69.93
03.01.08
un
4.28
14.77
19.05
19.05
03.01.09
un
29.66
102.29
131.95
131.95
03.01.10
un
16.86
58.15
75.01
150.03
03.01.11
15
un
12.43
42.87
55.30
829.53
03.01.12
un
4.21
14.53
18.74
37.49
03.01.13
un
11.16
38.47
49.63
49.63
03.01.14
T 90 F GALVANIZADO 3"
12
un
19.49
67.21
86.70
1,040.41
QUANT
5.00
UN
MO
MAT
2.27
6.08
CUSTO
8.35
2,183.44
41.75
41.75
152,066.43
Pgina 1
UN
MO
MAT
CUSTO
47,395.90
2,494.06
ITEM
DISCRIMINAO
QUANT.
UN.
CUSTO
MO-DEOBRA
CUSTO
MATERIAL
CUSTO
UNITRIO
CUSTO TOTAL
03.01.15
T 90 F GALVANIZADO 2 "
un
15.03
51.83
66.86
133.72
03.01.16
T 90 F GALVANIZADO 1 "
un
4.70
16.21
20.91
83.64
03.01.17
un
12.83
44.24
57.07
57.07
03.01.18
LUVA F GALVANIZADA 2
un
8.70
29.99
38.69
193.44
03.01.19
un
34.66
119.50
154.16
770.78
03.01.20
un
155.75
537.06
692.81
692.81
03.01.21
un
91.40
315.16
406.56
813.11
03.01.22
un
60.18
207.52
267.70
535.40
03.01.23
un
15.97
55.07
71.04
71.04
03.01.24
un
47.28
163.05
210.33
210.33
03.01.25
un
34.42
118.68
153.10
306.19
03.01.26
un
412.68
2,544.84
2,957.52
5,915.04
1.00
un
242.40
1,880.00
2,122.40
2,122.40
86.09
03.01.27
QUADRO DE COMANDO -BOMBA 7,5CV - ALIMENTAO CABO 6mm, INCLUINDO 01 DISJ. TRIPOLAR 32A,
CHAVE FUSVEL, CHAVE ESTRELA/TRINGULO e CONTACTORES 25A, CONTACTORES OU RELS AUXILIARES
TRMICOS/ FALTA DE FASE/ TEMPORIZADORES CCLICOS PARA AUTOMAO
03.01.28
CAIXA DE PROTECAO P/ MEDIDOR TRIFASICO E DISJUNTOR EM CHAPA DE ACO GALV 18 USG - PADRO P1
CEB - MEDIDAS 172X372X450mm
1.00
un
0.00
86.09
86.09
03.01.29
1.00
un
16.67
69.43
86.09
86.09
155.00
1.17
3.51
4.68
725.40
130.00
1.08
1.89
2.97
386.10
31.00
3.79
10.05
13.84
429.04
50.00
64.50
64.50
03.01.30
03.01.31
CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1KV 6MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV
CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1KV 2,5MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV
03.01.32
ELETRODUTO DE ACO GALVANIZADO ELETROLTICO TIPO LEVE 1", INCLUSIVE CONEXOES - FORNECIMENTO
E INSTALACAO
03.01.33
MANOMETRO - 0 A 10KGF/CM2 D=100MM - CONEXAO 1/2" BSP, RETO, CAIXA E ANEL EM ACO ESTAMPADO
1020, ACABAMENTO EM PINTURA ELETROSTATICA EM EPOXI PRETO 0U EQUIV
03.01.34
un
350.90
1210.00
1,560.90
3,121.80
03.01.35
un
24.07
83.00
107.07
107.07
03.01.36
un
32.50
97.40
129.90
259.80
un
30.30
721.14
751.44
3,757.20
un
458.73
1,582.20
2,040.93
2,040.93
un
15.15
90.73
105.88
211.76
un
03.01.37
03.01.38
03.01.39
ABRIGO PARA HIDRANTE, 90X60X17CM, COM REGISTRO GLOBO ANGULAR EM BRONZE 45 2 " ,
ADAPTADOR STORZ 2 " , MANGUEIRA DE INCNDIO 20M, REDUO 2 " X1 " E ESGUICHO EM LATO 1
" - FORNECIMENTO E INSTALAO
DISPOSITIVO DE SUCO
CAIXA DE PASSAGEM EM ALVENARIA 60X60cm PARA HIDRANTE DE PASSEIO REVESTIDA INTERNAMENTE COM
BARRA LISA (ARGAMASSA CIMENTO E AREIA 1:4) COM FUNDO EM CONCRETO 15Mpa - INCLUSIVE
ESCAVAO
un
14.50
03.01.40
TAMPAO FOFO ARTICULADO 37KG CARGA MAX 12500KG DIAM ABERT 500MM P/ CAIXA DE PASSAGEM HIDRANTE DE PASSEIO
03.02.00
SPDA - ATERRAMENTO
03.02.01
1.00
un
11.52
31.00
42.52
42.52
03.02.02
1.00
un
61.44
229.19
290.63
290.63
03.02.03
21.00
2.98
8.31
11.29
237.09
03.02.04
1312.00
4.50
17.46
21.96
28,811.52
03.02.05
494.00
4.50
23.38
27.88
13,772.72
03.02.06
TERMINAIS CAPTORES 3/8" 25mm DE ALTURA, EM AO GF, COM BANDEIRA HORIZONTAL, REFERNCIA TEL0444 DA TERMOTCNICA OU EQUIVALENTE
160.00
un
8.73
6.78
15.51
2,481.60
03.02.07
40.00
un
8.00
54.91
62.91
2,516.40
03.02.08
45.00
un
9.00
22.79
31.79
1,430.55
03.02.09
40.00
9.09
44.91
54.00
2,160.00
03.02.10
1.00
un
18.00
81.65
99.65
03.03.00
03.03.01
36.00
un
5.31
140.00
145.31
03.03.02
3.00
un
7.10
129.50
136.60
409.80
03.03.02
4.00
un
5.31
457.87
463.18
1,852.72
03.04.00
03.04.01
CENTRAL DE ALARME - CAIXA EM CHAPA DE AO PINTADA NA COR BRANCO GELO SOBRE BASE ANTIFERRUGEM COM FONTE DE ALIMENTAO PRPRIA, AT 24 PONTOS, TENSO DE SADA 24Vcc E OUTRAS
CARACTERSTICAS CONFORME ESPECIFICAES
03.04.02
QUANT
QUANT
QUANT
UN
UN
UN
42.18
MO
182.00
MAT
MO
MAT
MO
MAT
224.18
CUSTO
CUSTO
CUSTO
448.36
51,842.68
99.65
7,493.68
5,231.16
22,548.55
1.00
un
15.36
413.50
428.86
428.86
20.00
un
2.23
61.70
63.93
1,278.60
03.04.04
20.00
un
45.77
756.39
802.16
16,043.20
03.04.05
ELETRODUTO DE ACO GALVANIZADO ELETROLTICO TIPO LEVE 1", INCLUSIVE CONEXOES - FORNECIMENTO
E INSTALACAO
270.00
3.79
10.05
13.84
3,736.80
03.04.06
270.00
un
0.76
1.89
2.65
714.83
03.04.07
29.00
un
3.03
8.91
11.94
03.05.00
ILUMINAO DE EMERGNCIA
03.05.01
QUANT
LUMINRIAS DE EMERGNCIA DO TIPO BLOCO AUTNOMO, 220 VOLTS, COM DUAS LMPADAS
FLUORESCENTES TUBULARES TIPO T5, DE 8W, AUTONOMIA DE 4 HORAS. REFERNCIA AVANT OU
EQUIVALENTE, COM AVISO DE SADA
46.00
QUANT
UN
MO
un
8.45
03.06.01
44.00
un
0.71
16.79
17.50
770.00
03.06.02
21.00
un
0.71
14.78
15.48
325.18
03.06.03
114.00
un
0.71
12.76
13.47
1,535.57
03.06.04
2.00
un
0.71
12.09
12.80
25.60
03.07.00
SADAS DE EMERGNCIA
03.07.01
Pgina 2
MO
MAT
6.06
78.68
CUSTO
7,054.10
UN
MAT
153.35
346.26
7,054.10
SINALIZAO DE EMERGNCIA
35.00
MO
144.90
CUSTO
03.06.00
QUANT
UN
MAT
CUSTO
84.74
2,656.36
13,075.17
2,965.90
DISCRIMINAO
QUANT.
03.07.02
54.67
03.07.03
63.00
03.07.04
18.18
1.20
42.42
ARMACAO ACO CA-50, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA /
COLOCAO.
25.00
kg
1.52
PISO DE BORRACHA FRISADO, PLURIGOMA PRETO, ESPESSURA 7MM, ASSENTADO COM ARGAMASSA TRACO
1:3 (CIMENTO E AREIA)
12.00
FORNECIMENTO E INSTALAO DE CANTONEIRA ALUMINIO ABAS IGUAIS 1 1/4" E = 3/16" NOS DEGRAUS DA
NOVA ESCADA
24.00
04.00.00
ADMINISTRAO DA OBRA
04.00.01
04.00.02
QUANT
UN.
CUSTO
MO-DEOBRA
ITEM
UN
CUSTO
MATERIAL
CUSTO
UNITRIO
CUSTO TOTAL
39.39
90.81
130.20
7,118.03
0.59
1.15
1.74
109.62
28.96
47.14
622.25
332.23
374.65
449.58
4.02
5.53
138.25
16.67
92.09
108.75
1,305.00
2.27
13.00
15.27
366.54
MO
MAT
CUSTO
28,116.00
88.00
48.28
0.00
48.28
4,248.64
ENCARREGADO DE OBRA
352.00
31.29
0.00
31.29
11,014.08
04.00.03
APONTADOR
352.00
10.33
0.00
10.33
3,636.16
04.00.04
ALIMENTAO - 10 OPERRIOS
2.00
ms
2200.00
0.00
2,200.00
4,400.00
04.00.05
TRANSPORTE - 10 OPERRIOS
2.00
ms
2200.00
0.00
2,200.00
4,400.00
04.00.06
MATERIAIS DE CONSUMO
2.00
ms
0.00
99.00
99.00
198.00
04.00.07
MQUINAS E FERRAMENTAS
2.00
ms
0.00
10.56
10.56
21.12
04.00.08
TRANSPORTES E FRETES
2.00
ms
99.00
0.00
99.00
198.00
05.00.00
05.00.01
40.00
11.69
0.00
11.69
05.00.02
20.00
11.68
0.00
11.68
233.60
05.00.03
3200.00
1.00
0.07
1.07
3,424.00
05.00.04
AS-BUILT
3200.00
0.62
0.38
1.00
3,200.00
25.65
QUANT
UN
MO
MAT
CUSTO
7,325.20
467.60
TOTAIS
OBRA
219,449.33
BDI
GARANTIA
1.00
RISCO
2.00
DESPESAS FINANCEIRAS
3.00
ADMINISTRAO CENTRAL
5.00
10.00
COFINS (3,00%)
3.00
PIS (0,65%)
0.65
ISS (1,00%)
1.00
LUCRO
TOTAL ESTIMADO
56,288.75
275,738.08
Pgina 3
0.35
DISCRIMINAO
P
15 DIAS
01.00.00
SERVIOS PRELIMINARES
02.00.00
ARQUITETURA
03.00.00
04.00.00
ADMINISTRAO DA OBRA
05.00.00
30 DIAS
45 DIAS
60 DIAS
12,720.58
TOTAL DO ITEM
12,720.58
4.61%
6.97%
9,610.56
5,766.34
1,922.11
1,922.11
19,221.13
15,206.64
45,619.93
60,826.57
30,413.29
152,066.43
55.15%
7,029.00
7,029.00
7,029.00
7,029.00
28,116.00
10.20%
0.3
PORCENTAGEM
ITEM
0.25
0.2
0.15
0.1
0.05
BDI
14,072.19
14,072.19
14,072.19
7,325.20
7,325.20
14,072.19
56,288.75
DESEMBOLSO QUINZENAL
58,638.97
72,487.46
83,849.87
60,761.79
PERCENTUAL QUINZENAL
21.27%
26.29%
30.41%
22.04%
PERCENTUAL ACUMULADO
21.27%
47.55%
77.96%
100.00%
275,738.08
2.66%
20.41%
100.00%
15 DIAS
15 DIAS
30 DIAS
45 DIAS
60 DIAS