Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Initial
Sr.
No.
L.E. / E.M
Description :
(Engineer)
ERF No.:
CHECKER
6271
(Draftsperson)
Project No.:
ORIGINATOR
Dated:
Sign
Description
If existing drawing is modified, new modifications are shown in thick layer and exisitng system is
shown dim layer.
Civil Foundation Layout has been checked as per equipment plot plan or piping plans and
coordinates have been marked properly.
Civil foundation details & general notes have been checked and bar-bending schedule has been
marked on drawing.
100%
100%
SPOT
In case of pipe supports, the elevations, type of pipe supports have been checked, marked and
tabulated as per piping plans.
14
Structural Steel sections and staircase / ladder / platform details have been correctly marked on
drawing.
15
In case of anchor bolts, the anchor bolts layout has been checked with skid dimensional drawing,
civil foundation layout, equipment plot plan and piping plan.
In case of road details, layout, elevation and culverts if any, have been checked as per the
requirements and site conditions.
Civil foundation layout has been checked as per site information; as-built equipment plot plan and
piping plans and coordinates have been marked properly as per site measurements.
24 Civil foundation elevations have been checked as per as-built piping plans and site information
25
In case of pipe supports, the elevations, type and coordinates of pipe supports have been checked,
marked and tabulated as per site information.
292112091.xls/Civil