How I began
Page 2
I checked and re checked all wires before mounting external parts. If you go to the final
wiring section, you will also find pictures of my rigging of these parts. I could have done
it many different ways, but this is what I chose at this time.
It took me about 3 hours of procrastination to finally assemble it all. You know how it is
on a project, once you are ready with all your parts, your mind starts giving you a million
ways of doing something. And, at last you just pick a way and go with it.
Once I got it all together, I connected my air tank hose and put the pressure setting at 28
for a safe point to start. I fired it up and BAM - that baby didnt need any more adjusting.
It was cutting!
You can imagine all the relief and pride I felt when the Plasanator started kicking ass.
Yea, I said it Kicking Ass Baby. Oops Wife just told me I need to stop, hee hee and for
all you creators ah ah ah ahhhhhh.
I hope you enjoyed riding along with me in my journey.
Take care and be safe.
The Plasmaman
Introduction
Parts
Pictorial
Chevy Coil
Schematic
Chevy Board
Layout
Ford Coil
Schematic
Ford Board
Layout
View of Board
Mounted
Components
Power Control
3 KVA step down
Transformer
Slides 13/14
Transformer
Connections to Board
Terminals
High
Current
Section
Slides 16-22
Low Voltage
Power
Section
Slides 24/25
Relay Terminal
Connections
by Color
Slides 26-30
Ground Lead to
Head Terminal
High Voltage
Arc Start
System
Connections
Slides 34/35
page 1
page 2
Final wiring
of
External Mounted Parts,
like the
Head,
Water Heater Element,
Air Solenoid & Air
Regulator
&
Work Clamp
Slides 43-47
HomemadeTerminal