Sei sulla pagina 1di 3

Soal 2

One ton per hour of dolomite is produced by chrushing and then screening through a 14mesh screen. According to the screen analysis below, calculate :
a. The total load to crusher,
b. The effectiveness of the screen.
Tyler mesh
4 on
8 on
14 on
28 on
48 on
100 on
100 through

Feed to screen,
(%)
14.3
20.0
20.0
28.5
8.6
5.7
2.86

Screen undersize,

Screen Oversize,

Product (%)

Circulating Load, %
20
28
28
24
0 through 28 mesh

0.0
40.0
30.0
20.0
10.0

Ditanya :
1. Total load to crusher?
2. The effectiveness of the screen?
Jawab :

1. Total load to crusher


Data diambil dari mesh 14 sampai mesh 100 through
XF = 0.4566

F = Feed

XP = 1

P = Product

XR = 0.24

R = Rejected

Berdasarkan persamaan dari Brown hal 15 diperoleh :


P ( X F X R )
=
F ( X P X R)

F=

( X PX R )
P
( XF XR)

F=

(10.24 )
1 ton
( 0.45660.24 )

F = 3.508 ton

Jadi umpan total adalah 3,508 ton

2. The effectiveness of the screen.


Recovery

XP( XF XR)
X F ( X P X R )

1( 0.45660.24 )
= 0.4566(10.24 )
=

0.2166
0.34565

= 0.625

Rejection

(1X P)( X F X R )
(1X F )( X PX R )

(11)(0.45660.24)
= 1 (10.4566)(10.241)
= 10
=1

Effectiveness

= Recovery Rejection
=

XP( XF XR)
(1X P )( X F X R )
1
X F (X P X R )
(1X F )( X P X R )

= 0.625 x 1
= 0.625
Effectiveness = 62,5%

Jadi efektivitas dari screen adalah 62,5%