Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1544 lb
6867.71 n
6.86771 Kn
3 Moment =
202981 lb-in
2E+007 n-mm
22.7069 Kn-m
300 mm
0.9 m
1 m
0.2 m
1.74 m
2.94 m
1.544 Kn
20.1911 Kn-m
42.898 Kn-m
300 x
25
`
500
300 mm
Pu/fck *b*D =
0.00103
Mu/fck *b*D*D =
0.09533
P/Fck =
P=
Ast. =
Area of steel pier for exterior row
0.06
1.5 %
1350 sq.mm
4.43 Sq.inch
2858.06 sq.mm
>
1350
1206 sq.mm
1726 lb
7677.25 n
7.67725 Kn
3 Moment =
202981 lb-in
2E+007 n-mm
22.7069 Kn-m
9.65661 sq.mm
22.5711 Kn-m
Total moment =
Equalent Size of the pedastal
Grade of concrete -M
45.278 Kn-m
266 x
25
`
500
0.00819
Mu/fck *b*D*D =
0.14434
266 mm
P/Fck =
P=
0.08
2 %
Ast. =
1415.12 sq.mm
4.43 Sq.inch
2858.06 sq.mm
>
1415.12
1206 sq.mm
Hence o.k
Design for Ulift
1 Vertical load(tension) =
2171 lb
9656.61 n
9.65661 Kn
300 mm
2300 mm
942.857 mm
2168571 Sq.mm
33 degress
0.57619
10 Kn/sq.m
21.6857 Kn.
4.693 Kn
2.07 Kn/sq.m
26.3787 Kn
2.73167 >
2.5
DESIGN OF FOUNDATIONS
3 Moment =
2250 lb
10008 n
10.008 Kn
0 lb-in
0 n-mm
0 Kn-m
300 mm
0.9 m
1 m
0.2 m
1.74 m
2.94 m
12.917 Kn
29.4235 Kn-m
Total moment =
29.4235 Kn-m
300 x
25
`
500
300 mm
Pu/fck *b*D =
0.00861
Mu/fck *b*D*D =
0.06539
P/Fck =
P=
Ast. =
Area of steel pier for exterior row
0.04
1 %
900 sq.mm
4.43 Sq.inch
2858.06 sq.mm
>
900
Hence o.k
Provided reint .(6nos of 12 mm dia) =
as extra safty
Hence o.k
678 sq.mm
3 Moment =
2454 lb
10915.4 n
10.9154 Kn
0 lb-in
0 n-mm
0 Kn-m
8.86486 sq.mm
32.0913 Kn-m
Total moment =
32.0913 Kn-m
266 x
25
`
500
0.00752
0.1023
266 mm
P/Fck =
0.07
P=
1.75 %
Ast. =
Area of steel pier for exterior row
1238.23 sq.mm
4.43 Sq.inch
2858.06 sq.mm
>
1238.23
Hence o.k
However Provided reint .(6nos of 12
as extra safty
Hence o.k
678 sq.mm
1993 lb
8864.86 n
8.86486 Kn
300 mm
2000 mm
942.857 mm
1885714 Sq.mm
33 degress
0.57619
10 Kn/sq.m
18.8571 Kn.
3.54858 Kn
1.8 Kn/sq.m
22.4057 Kn
2.52748 >
2.5
DESIGN OF FOUNDATIONS
803 lb
3571.74 n
3.57174 Kn
3 Moment =
132090 lb-in
1E+007 n-mm
14.7765 Kn-m
300 mm
0.9 m
1 m
0.2 m
1.74 m
2.94 m
8.25104 Kn
10.5009 Kn-m
Total moment =
25.2775 Kn-m
300 x
25
`
500
300 mm
Pu/fck *b*D =
Mu/fck *b*D*D =
0.0055
0.05617
P/Fck =
0.05
P=
1.25 %
Ast. =
Area of steel pier for interior row
1125 sq.mm
2.04 Sq.inch
1316.13 sq.mm
>
1125
Hence o.k
However Provided reint .(6nos of 12
As extra safty
Hence o.k
678 sq.mm
867 lb
3856.42 n
3.85642 Kn
3 Moment =
132090 lb-in
1E+007 n-mm
14.7765 Kn-m
4.1233 sq.mm
11.3379 Kn-m
Total moment =
26.1144 Kn-m
266 x
25
`
500
0.0035
0.08325
266 mm
P/Fck =
P=
Ast. =
Area of steel pier for interior row
Hence o.k
However Provided reint .(6nos of 12m
As extra safty
0.06
1.5 %
1061.34 sq.mm
2.04 Sq.inch
1316.13 sq.mm
>
1061.34
678 sq.mm
927 lb
4123.3 n
4.1233 Kn
300 mm
1500 mm
942.857 mm
1414286 Sq.mm
33 degress
0.57619
10 Kn/sq.m
14.1429 Kn.
1.99608 Kn
1.35 Kn/sq.m
16.1389 Kn
3.91409 >
2.5
DESIGN OF FOUNDATIONS
3 Moment =
855 lb
3803.04 n
3.80304 Kn
0 lb-in
0 n-mm
0 Kn-m
300 mm
0.9 m
1 m
0.2 m
1.74 m
2.94 m
7.65946 Kn
11.1809 Kn-m
Total moment =
11.1809 Kn-m
300 x
25
`
500
300 mm
Pu/fck *b*D =
0.00511
Mu/fck *b*D*D =
0.02485
P/Fck =
P=
0 %
Ast. =
0 sq.mm
Hence no reint. Is required. Further the steel suport is extended upto bottom of
pedastal.This will act as extra reinforcement
Hence o.k
Design for tension Loads
MAX COMBINED LOADS(D.L +W.L)
For LC7ASD TILT ANGLE 30 DEGREES
1 Vertical load(Tension) =
927 lb
4123.3 n
4.1233 Kn
2 Horizontal load =
3 Moment =
867 lb
3856.42 n
3.85642 Kn
0 lb-in
0 n-mm
0 Kn-m
4.1233 sq.mm
11.3379 Kn-m
Total moment =
11.3379 Kn-m
266 x
25
`
500
0.0035
0.03614
0.02
266 mm
P=
Ast. =
Area of steel pier for interior row
0.5 %
353.78 sq.mm
2.04 Sq.inch
1316.13 sq.mm
>
353.78
Hence o.k
Hence no separate reint . Is required
Design for Ulift
1 Vertical load(tension) =
927 lb
4123.3 n
4.1233 Kn
300 mm
1300 mm
942.857 mm
1225714 Sq.mm
33 degress
0.57619
10 Kn/sq.m
12.2571 Kn.
1.49927 Kn
1.17 Kn/sq.m
13.7564 Kn
3.33627 >
0.02 lb
0.08896 n
9E-005 Kn
0 mm
1300 mm
2.5
0 mm
0 Sq.mm
33 degress
0.57619
10 Kn/sq.m
0 Kn.
0 Kn
1.17 Kn/sq.m
0 Kn
0 >
2.5
Design of Pile
Diameter of pile
Length of Pile
=
=
300 mm
5 m
=
=
100 KN
1 m
= Pu * e
100 KN.m
M
kh
15000000 N/m2
Ep
1000000000 N/m2
Ip
= /64*(B)4
=
=
B
L
Pu
e
= EpIp/kh.B
3.5R =
Check for length of pile:
Ratio of Length of pile to Stiffness Factor
L/R
0.0003977679 m4
1 kg/cm2
Clay
0.545 m
1.908 m
9.170
LONG PILE
L1
= e
L1/R =
= R*1.42
1 m
1.8340
1.42
0.7743 m
2.581 M
Mu
= H(e+zf)
= Mu/(e+zf)
56.36 KN
As the fixed end moment (Mf) of equivalent cantilevr is higher than the actual maimum moment
'M' in the Pile, the actual maximum moment may be obtained by multiplying the fixed end
moment of the equivalent cantilever by a reduction factor, m as given in Fig. 5 of IS 2911
e/R
From Chart 5A of IS:2911, for e/R=1.834 for free m
heade piles, the value of m is
Actual lateral/Horizontal capacity of pile after
Mu
applying reduction Factor (m)
=
=
= m*(H)*(e+zf)
1.8340
0.6200
0.62
Design of Pile
Type of Pile
Diameter of pile
Length of Pile
= Bored Cast-in-situ
=
=
B
L
300 mm
2.5 m
=
=
25 N/mm2
2 Nos.
1.5 m
18 KN/m3
=
=
=
=
32 Degrees
44
25 t/m2
10 kg/cm2
H2
0.5 m
18.5 KN/m3
=
=
=
32 Degrees
50
30 t/m2
: Cohessionless
Gravel (GP)
Poorly
Graded
= Ap(0.5*DN+PDNq)+KiPDitanAsi
Qu
The first term gives end bearing resistance and the second term gives skin friction resistance.
Length of pile passing through layer-1
L1
L2
Ap
PD
K
PD1
D1
D2
1.5 m
0.5 m
/4 *(D )
2
0.0707 m2
32.652
30
=
=
=
Qu
F.S
Qsafe
=
=
= 0.75
=
=
=
W
Ps
Pu
F.S
Psu
=
=
=
=
=
36.25 KN/m2
1.00
27 KN/m2
1.414
0.471
24
151.28
2.5
60.51
m2
m2
4.42
67.97
72.39
3.00
24.13
KN
KN
KN
KN
KN
KN
Pu
Moment
= Pu * e
M
nh
Ep
= 5000fck
25000000000 N/m2
Ip
= /64*(B)4
=
=
0.0003977679 mm4
1 kg/cm2
Granular Soil
=
=
=
100 KN
0.5 m
50 KN.m
15000000 N/m3
= (EpIp/nh)1/5
0.921 m
=
=
1.842 m
3.684 m
2.714
L1
= e
L1/R =
= R*1.42
0.5 m
0.5428
1.42
1.3079 m
4.360 M
Mu
= H(e+zf)
= Mu/(e+zf)
27.66 KN
As the fixed end moment (Mf) of equivalent cantilevr is higher than the actual maimum moment
'M' in the Pile, the actual maximum moment may
the fixed end
e/R be= obtained by multiplying0.5428
moment
of
the
equivalent
cantilever
by
a
reduction
factor,
m
as
given
in
Fig.
5
of
IS
2911
From Chart 5A of IS:2911, for e/R=1.834 for free m =
0.6200
heade piles, the value of m is
Actual lateral/Horizontal capacity of pile after
Mu
= m*(H)*(e+zf)
0.62
applying reduction Factor (m)