Project Title: Cadangan Kerja Tanah Persiaran Cassia Barat 1, Di Lot 282, Mukim 13, Batu

Kawan, SPS,Penang
Typical Section

Existing Embankment

New Embankment

New Embankment

Min. 1.0m cut into


Existing Embankment

2.5m

Min. 1.5m

OGL

Soft Soil Foundation

Tencate Polyfelt PET or approved


equilvalent geotextile by consultant

Note: Assumed soil parameters, external loading, and ground profile bearing capacity must be verified by qualified consultant prior to construction