Sei sulla pagina 1di 5

S10

Pgina

Presupuesto
Presupuesto

0302011

Cliente

MUNICIPALIDAD DISTRITAL DE SANTA

Lugar

ANCASH - SANTA - SANTA

Item

Descripcin

01

ESTRUCTURAS

01.01

"CONSTRUCCION DE ENCAUZAMIENTO Y DEFENSA RIBEREA EN EL RIO LACRAMARCA-LUPAHUARI, I ETAPA"


Costo
al

Und.

Metrado

Precio S/.

OBRAS PROVISIONALES

01.01.01

CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 m

und

1.00

751.13

01.01.02

CAMPAMENTO PROVISIONAL DE OBRA

glb

1.00

8,584.00

01.01.03

MEJORAMIENTO DE CAMINO CARROZABLE EN CANTERA

km

1.00

4,068.06

01.01.04

HABILITACION DE CAMINO DE ACCESO EN OBRA

km

1.00

4,278.05

500.00

5.68

01.02

OBRAS PRELIMINARES

01.02.01

TRAZO, REPLANTEO Y CONTROL TOPOGRAFICO

01.02.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

vje

2.00

4,000.00

01.03

MOVIMIENTO DE TIERRAS

01.03.01

DESCOLMATACION Y ENCAUZAMIENTO DE RIO CON MAQUINARIA

m3

25,000.00

3.51

01.03.02

CORTE DE MATERIAL SUELTO CON EQUIPO

m3

16,598.25

4.71

01.03.03

RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO


NORMAL

m3

4,925.93

23.30

01.03.04

EXCAVACION DE TERRENO NATURAL PARA CIMENTACION DE


MURO DE GAVION

m3

1,200.00

7.54

01.03.05

ELIMINACIN DE MATERIAL EXCEDENTE C/MAQUINARIA

m3

12,839.56

12.37

m3

3,700.00

21.44

01.04
01.04.01
01.04.02

GAVIONES
RECOLECCION Y APILAMIENTO DE PIEDRA DE 8" - 10"
MURO DE GAVIONES DE CAJA CON ALAMBRE GALVANIZADO DE
3.40mm CON RECUB. PVC SUMINISTRO E INSTALACION

01.04.02.01

MURO DE GAVIONES DE CAJA DE 5.0 m x 1.0 m x 1.00 m

und

200.00

590.77

01.04.02.02

MURO DE GAVIONES DE CAJA DE 5.0 m x 1.00 m x 1.50 m

und

200.00

757.50

01.04.02.03

COLCHON ANTISOCAVANTE 4.0 m x 4.00 m x 0.30 m

und

500.00

615.13

01.05
01.05.01
01.06

LIMPIEZA FINAL DE OBRA


LIMPIEZA DE TERRENO MANUAL

m2

25,000.00

2.62

FLETE TERRESTRE

01.06.01

FLETE TERRESTRE CON TRANSPORTE LIMA - QUERENGO


(ROLLO DE MALLAS PARA GAVION)

glb

1.00

2,000.19

01.06.02

FLETE TERRESTRE CON TRANSPORTE DE PIEDRA (0.5 km DE


CANTERA HASTA ALMACEN - QUERENGO)

m3

3,700.00

28.70

01.06.03

TRASLADO DE PIEDRA ( CON PERSONAL DEL ALMACENAMIENTO


HASTA LA OBRA)

m3

3,700.00

14.96

COSTO DIRECTO
GASTOS GENERALES 10.0000%
UTILIDAD (5%)
EXPEDIENTE TECNICO (0.33%)

---SUB TOTAL
IGV (18%)

=======
PRESUPUESTO TOTAL

Pgina

I ETAPA"
23/09/2015

Precio S/.

Parcial S/.
1,362,685.72
17,681.24
751.13

751.13

8,584.00

8,584.00

4,068.06

4,068.06

4,278.05

4,278.05
10,840.00

5.68

2,840.00

4,000.00

8,000.00
448,575.29

3.51

87,750.00

4.71

78,177.76

23.30

114,774.17

7.54

9,048.00

12.37

158,825.36
656,547.00

21.44

79,328.00
577,219.00

590.77

118,154.00

757.50

151,500.00

615.13

307,565.00

65,500.00
2.62

65,500.00
163,542.19

2,000.19

2,000.19

28.70

106,190.00

14.96

55,352.00

1,362,685.72
136,268.57
68,134.29
4,496.86
------------------------------------1,571,585.44
282,885.38
=========================
1,854,470.82

CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA


PROYECTO: Construccin de Obras de Encauzamiento y Defensa Riberea del Ro Lacramarca- LupahuarI, I ETAPA
FECHA:

OCTUBRE DEL 2015

DESCRIPCIN

INICIO:

COSTO PARCIAL

ESTRUCTURAS
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
GAVIONES
LIMPIEZA INAL DE OBRA
FLETE TERRESTRE

1,362,685.72
17,681.24
10,840.00
448,575.29
656,547.00
65,500.00
163,542.19

COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 5%
EXPEDIENTE TECNICO 0.33%
SUBTOTAL
IGV (18%)
COSTO TOTAL

1,362,685.72
136,268.57
68,134.29
4,496.86
1,571,585.44
282,885.38
1,854,470.82

15-Oct-15

ENTREGA:

DEL
DEL
DEL 15/10/15
01/11/15 AL 01/12/15 AL
AL 31/10/15
30/11/15
23/12/15
17,681.24
4,336.00
44,857.53

6,504.00
224,287.65
262,618.80

32,708.44

65,416.88

179,430.12
393,928.20
65,500.00
65,416.88

99,583.21
9,958.32
4,979.16
328.62
114,849.31
20,672.88
135,522.19

558,827.32
55,882.73
27,941.37
1,844.13
644,495.55
116,009.20
760,504.75

704,275.19
70,427.52
35,213.76
2,324.11
812,240.58
146,203.30
958,443.88