Presupuesto
0302011
Cliente
Lugar
Item
Descripcin
01
ESTRUCTURAS
01.01
Und.
Metrado
Precio S/.
OBRAS PROVISIONALES
01.01.01
und
1.00
751.13
01.01.02
glb
1.00
8,584.00
01.01.03
km
1.00
4,068.06
01.01.04
km
1.00
4,278.05
500.00
5.68
01.02
OBRAS PRELIMINARES
01.02.01
01.02.02
vje
2.00
4,000.00
01.03
MOVIMIENTO DE TIERRAS
01.03.01
m3
25,000.00
3.51
01.03.02
m3
16,598.25
4.71
01.03.03
m3
4,925.93
23.30
01.03.04
m3
1,200.00
7.54
01.03.05
m3
12,839.56
12.37
m3
3,700.00
21.44
01.04
01.04.01
01.04.02
GAVIONES
RECOLECCION Y APILAMIENTO DE PIEDRA DE 8" - 10"
MURO DE GAVIONES DE CAJA CON ALAMBRE GALVANIZADO DE
3.40mm CON RECUB. PVC SUMINISTRO E INSTALACION
01.04.02.01
und
200.00
590.77
01.04.02.02
und
200.00
757.50
01.04.02.03
und
500.00
615.13
01.05
01.05.01
01.06
m2
25,000.00
2.62
FLETE TERRESTRE
01.06.01
glb
1.00
2,000.19
01.06.02
m3
3,700.00
28.70
01.06.03
m3
3,700.00
14.96
COSTO DIRECTO
GASTOS GENERALES 10.0000%
UTILIDAD (5%)
EXPEDIENTE TECNICO (0.33%)
---SUB TOTAL
IGV (18%)
=======
PRESUPUESTO TOTAL
Pgina
I ETAPA"
23/09/2015
Precio S/.
Parcial S/.
1,362,685.72
17,681.24
751.13
751.13
8,584.00
8,584.00
4,068.06
4,068.06
4,278.05
4,278.05
10,840.00
5.68
2,840.00
4,000.00
8,000.00
448,575.29
3.51
87,750.00
4.71
78,177.76
23.30
114,774.17
7.54
9,048.00
12.37
158,825.36
656,547.00
21.44
79,328.00
577,219.00
590.77
118,154.00
757.50
151,500.00
615.13
307,565.00
65,500.00
2.62
65,500.00
163,542.19
2,000.19
2,000.19
28.70
106,190.00
14.96
55,352.00
1,362,685.72
136,268.57
68,134.29
4,496.86
------------------------------------1,571,585.44
282,885.38
=========================
1,854,470.82
DESCRIPCIN
INICIO:
COSTO PARCIAL
ESTRUCTURAS
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
GAVIONES
LIMPIEZA INAL DE OBRA
FLETE TERRESTRE
1,362,685.72
17,681.24
10,840.00
448,575.29
656,547.00
65,500.00
163,542.19
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 5%
EXPEDIENTE TECNICO 0.33%
SUBTOTAL
IGV (18%)
COSTO TOTAL
1,362,685.72
136,268.57
68,134.29
4,496.86
1,571,585.44
282,885.38
1,854,470.82
15-Oct-15
ENTREGA:
DEL
DEL
DEL 15/10/15
01/11/15 AL 01/12/15 AL
AL 31/10/15
30/11/15
23/12/15
17,681.24
4,336.00
44,857.53
6,504.00
224,287.65
262,618.80
32,708.44
65,416.88
179,430.12
393,928.20
65,500.00
65,416.88
99,583.21
9,958.32
4,979.16
328.62
114,849.31
20,672.88
135,522.19
558,827.32
55,882.73
27,941.37
1,844.13
644,495.55
116,009.20
760,504.75
704,275.19
70,427.52
35,213.76
2,324.11
812,240.58
146,203.30
958,443.88