Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PROYECTO
OBRA
UBICACIN
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
PRESUPUESTO
01.00.00
OBRAS PROVISIONALES
GLB
1.00
12,422.78
02.00.00
TRABAJOS PRELIMINARES
GLB
1.00
110,858.39
03.00.00
1.00
5,817.94
M3
19,199.61
187,878.69
639,446.88
1,956,817.70
03.01.00
03.02.00
MOVIMIENTO DE TIERRAS
03.03.00
M2
130,381.78
03.04.00
ML
47,087.22
88,147.73
03.05.00
ML
210.00
106,179.16
03.06.00
167.00
1,267.53
37,365.98
03.06.01
03.06.02
UND
71.00
4,631.59
03.06.03
UND
1.00
195.04
03.06.04
UND
1.00
540.11
03.06.05
UND
5.00
6,521.22
03.06.06
UND
1.00
15,755.17
03.06.07
UND
6.00
8,455.32
03.07.00
03.07.01
UND
23.00
03.07.02
UND
50.00
330,263.11
03.07.03
UND
86.00
222,183.56
03.07.04
UND
2.00
18,422.69
03.07.05
UND
9.00
103,730.02
03.07.06
ML
35.50
2,875.19
03.07.07
ML
24.00
03.08.00
828,105.38
146,404.78
4,226.03
63,875.94
03.08.01
UND
25.00
20,065.30
03.08.02
UND
39.00
22,295.89
03.08.03
UND
32.00
17,561.69
03.08.04
UND
33.00
04.00.00
3,953.06
323,424.74
04.01.00
MOVIMIENTO DE TIERRAS
M3
2,614.20
24,487.06
04.02.00
M2
3,615.30
238,135.92
04.03.00
04.03.01
UND
1.00
04.03.02
UND
1.00
826.18
04.03.03
ML
1,080.00
39,396.35
ML
540.00
10,105.62
04.03.04
05.00.00
60,801.76
MITIGACION AMBIENTAL
10,473.61
84,424.91
05.01.00
MES
6.00
24,000.00
05.02.00
PROGRAMA DE SEALIZACION
UND
28.00
5,768.56
05.03.00
PROGRAMA DE REFORESTACION
HAS
0.95
4,278.04
05.04.00
GLB
1.00
46,878.31
PLAN DE CONTINGENCIAS
GLB
1.00
3,500.00
05.05.00
06.00.00
9,927.66
06.01.00
UND
114.00
6,896.43
06.02.00
UND
15.00
1,584.00
06.03.00
UND
31.00
1,447.23
56,804.00
07.00.00
GLB
1.00
08.00.00
OTROS
GLB
1.00
990.80
09.00.00
FLETE
GLB
1.00
32,796.77
2,588,467.75
271,949.02
43,370.00
TOTAL PRESUPUESTO
SON: DOS MILLONES NOVECIENTOS TRES MIL SETECIENTOS OCHENTISEIS Y 77/100 NUEVOS SOLES
2,903,786.77
DESAGREGADO DE COSTOS
OBRA: REHABILITACION DE CAMINOS VECINALES EN EL VALLE DEL DISTRITO DE HUANTA, PROV.
HUANTA-AYACUCHO
RUBROS DEL COSTO DIRECTO
Materiales
1,131,812.33
245,768.06
275,465.50
Equipo
821,240.82
Herramientas
24,580.75
Flete
32,796.77
56,804.00
Otros
2,588,467.97
#REF!
32,208.00
.
69,502.52
#REF!
#REF!
#REF!
#REF!
#REF!
TOTAL
DETALLE DE LOS APORTES VALORIZADOS NO
MONETARIOS
AP. COMUNAL
S/.
AP. MUNICIPAL
S/.
0.00
TOTAL
0.00
0.00
OBRA
UBICACIN
ITEM
PERSONAL
UND.
PRESUP. (S/.)
FONIPREL
147000011
INGENIERO VIAL
hh
1600.00
147000032
TOPOGRAFO
GLB
9247.89
9247.89
147000040
GLB
18000.00
18000.00
147000041
GLB
784.00
784.00
147010002
OPERARIO
GLB
113705.05
113705.05
147010003
OFICIAL
GLB
97535.68
97535.68
147010004
PEON
GLB
275465.50
275465.50
147010023
CONTROLADOR OFICIAL
GLB
7236.47
7236.47
147010025
PERFORISTA OFICIAL
GLB
42.97
42.97
147010101
ASISTENTE SOCIAL
GLB
3120.00
3120.00
TOTAL
526,737.56
MUNICIPALIDAD
HUANTA
POBLACION
BENEFICIARIA
1600.00
526,737.56
0.00
0.00
CONSOLIDADO INSUMOS
N
MATERIALES
UND.
PRESUP. (S/.)
FONIPREL
230200000
gln
1,798.19
1798.19
230220011
gln
10,982.79
10982.79
239050000
AGUA
M3
6,437.52
6437.52
202040009
Kg
11,972.14
11972.14
202040010
ALAMBRE NEGRO N8
Kg
239150010
ANALISIS GRANULOMETRICO
228010005
4,129.99
4129.99
UND
120.00
120.00
ANFO
Kg
107.87
107.87
204000000
ARENA FINA
M3
3,746.87
3746.87
205010004
ARENA GRUESA
M3
56,090.93
56090.93
213000006
ASFALTO RC-250
gln
18,324.57
18324.57
230020098
JGO
259.59
259.59
230750100
BOLETIN AMBIENTAL
UND
600.00
600.00
259010059
4,290.00
4290.00
220010001
221000000
202130021
Kg
104.00
104.00
202010061
Kg
6,625.83
6625.83
227010000
CORDON DETONANTE 3P
78.93
78.93
239020100
M3
109,759.46
109759.46
262000015
1,792.00
1792.00
228000022
DINAMITA
237040036
pln
gln
63,022.05
63022.05
BOL
292,291.75
292291.75
UND
Kg
72.79
72.79
UND
250.00
250.00
237040037
UND
125.00
125.00
237040035
UND
275.00
275.00
237040039
UND
250.00
250.00
237040038
UND
300.00
300.00
243510062
ESTACA DE MADERA
UND
1,210.30
1210.30
203030048
Kg
136,965.93
136965.93
204000005
FILLER
Kg
15,810.80
15810.80
227020011
FULMINANTE
UND
65.78
65.78
239060013
HOJA DE SIERRA
UND
4,384.76
4384.76
239080045
GLB
4,200.00
4200.00
239080049
GLB
3,500.00
3500.00
253000000
KEROSENE INDUSTRIAL
gln
3,353.81
3353.81
217000021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
489.13
489.13
243570051
LEA
CGA
84.14
84.14
230990019
LIJA
UND
70.94
70.94
239020006
hja
7.75
7.75
244010019
p2
798.00
798.00
243010003
MADERA TORNILLO
p2
85,633.13
85633.13
205300085
MATERIAL SELECCIONADO
M3
3,647.44
3647.44
227000010
MECHA LENTA
19.29
19.29
230300006
Kg
662.20
662.20
232970002
MOVILIZACION Y DESMOVILIZACION
GLB
35,460.00
35460.00
239080050
HA
50,400.00
50400.00
213010000
PEGAMENTO ASFALTICO
gln
30.24
30.24
202060006
1,936.00
1936.00
253100003
PETROLEO
gln
14,373.45
14373.45
205000004
M3
142,810.94
142810.94
205020051
M3
1,024.80
1024.80
205000033
M3
7,216.77
7216.77
254060000
PINTURA ANTICORROSIVA
gln
50.06
50.06
JGO
MUNICIPALIDAD
HUANTA
POBLACION
BENEFICIARIA
OBRA
UBICACIN
ITEM
254110011
PINTURA ESMALTE
gln
1,242.19
1242.19
254020036
gln
693.00
693.00
279560004
UND
480.00
480.00
239090050
UND
3,163.23
3163.23
239150009
UND
30.00
30.00
239150000
UND
900.00
900.00
239150008
UND
35.00
35.00
239150007
UND
30.00
30.00
239150005
UND
5,130.00
5130.00
230460039
UND
147.42
147.42
243600011
pza
448.00
448.00
243600037
UND
360.00
360.00
256020000
UND
8,625.00
8625.00
256020101
UND
1,680.00
1680.00
239900099
UND
9,440.00
9440.00
256020100
UND
12,285.00
12285.00
262000016
UND
1,738.80
1738.80
253030027
THINER
gln
39.33
39.33
229200013
THINNER ACRILICO
gln
78.40
78.40
204010003
M3
380.00
380.00
232010096
GLB
32,796.77
32796.77
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
20,353.05
20353.05
273010060
2,702.70
2702.70
288010002
130.87
130.87
265000058
1,490.00
1490.00
239080044
UTILES DE ESCRITORIO
GLB
2,100.00
2100.00
221020007
UND
11.92
11.92
229030002
BOL
1,385.49
1385.49
TOTAL
1,215,909.10
1,215,909.10
0.00
0.00
CONSOLIDADO EQUIPOS
N
EQUIPOS
UND.
PRESUP. (S/.)
FONIPREL
349050003
hm
1031.94
349050004
hm
331.70
331.70
348040003
hm
47668.98
47,668.98
349130004
hm
1289.93
1,289.93
349040009
hm
105792.31
105,792.31
349030004
hm
6838.96
6,838.96
349020011
hm
420.96
420.96
348950003
hm
672.00
672.00
337010001
HERRAMIENTAS MANUALES
24580.75
24,580.75
349060006
hm
168.38
168.38
349100011
hm
9502.19
9,502.19
348080000
MOTOBOMBA 10 HP 4"
hm
2531.09
2,531.09
349090000
MOTONIVELADORA DE 125 HP
hm
134961.23
134,961.23
349890001
NIVEL TOPOGRAFICO
hm
2345.36
2,345.36
349250001
PAVIMENTADORA DE 65 HP
hm
1326.78
1,326.78
349050020
hm
4975.43
4,975.43
349030013
hm
113712.72
113,712.72
349030025
hm
3014.15
3,014.15
349030043
hm
995.09
995.09
349050015
hm
1511.06
1,511.06
349190005
TEODOLITO Y MIRAS
hm
1260.61
1,260.61
349040033
hm
26792.39
26,792.39
349040034
hm
166079.20
166,079.20
349030061
hm
773.96
773.96
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
4231.83
4,231.83
348110004
VOLQUETE DE 10 M3
hm
145664.89
145,664.89
348110002
VOLQUETE DE 6 M3
hm
37347.68
%MO
TOTAL
845,821.57
MUNICIPALIDAD
HUANTA
POBLACION
BENEFICIARIA
1,031.94
37,347.68
845,821.57
0.00
0.00
EQUIPOS
UND.
PRESUP. (S/.)
1.0
GLB
271,949.02
2.0
GLB
43,370.00
TOTAL
TOTAL APORTES POR ENTIDAD
FONIPREL
MUNICIPALIDAD
POBLACION
HUANTA
BENEFICIARIA
271,949.02
43,370.00
315,319.02
315,319.02
0.00
2,903,786.77
2,903,786.77
0.00
0.00
0.00
RESUMEN DE PRESUPUESTO
PROYECTO
OBRA
UBICACIN
ITEM
: RESUMEN DE PRESUPUESTO
PRESUPUESTO BASE
MATERIALES
1,215,909.10
MANO DE OBRA
526,737.56
EQUIPOS Y HERRAMIENTAS
845,821.57
2,588,467.75
271,949.02
43,370.00
2,903,786.77
SON: DOS MILLONES NOVECIENTOS TRES MIL SETECIENTOS OCHENTISEIS Y 77/100 NUEVOS SOLES
OBRA
UBICACIN
ITEM
PART
01.00.00
DESCRIPCION
OBRAS PROVISIONALES
01.01.00
01.02.00
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
1,276.19
1,701.59
1,701.59
850.79
0.00
850.79
0.00
0.00
0.00
0.00
3.67
0.00
0.00
12,422.78
UND
2.00
4,253.97
8,507.94
2,126.99
0.00
MES 8
1/2 MES 9
TOTAL
0.00
8,507.95
0.00
0.00
3,914.84
01.02.01
M2
15.30
0.24
3.67
0.00
3.67
01.02.02
TRAZO Y REPLANTEO
M2
6.00
4.36
26.16
0.00
26.16
0.00
0.00
0.00
0.00
26.16
01.02.03
M3
4.80
17.76
85.25
0.00
85.25
0.00
0.00
0.00
0.00
85.25
01.02.04
M3
6.00
7.00
42.00
0.00
42.00
0.00
0.00
0.00
0.00
42.00
01.02.05
M3
4.52
133.79
604.73
0.00
604.73
0.00
0.00
0.00
0.00
604.73
01.02.06
M3
0.45
215.83
97.12
0.00
97.12
0.00
0.00
0.00
0.00
97.12
01.02.07
M3
1.16
319.17
370.24
0.00
312.79
57.45
0.00
0.00
0.00
370.24
01.02.08
M2
12.85
26.59
341.68
0.00
341.68
0.00
0.00
0.00
0.00
341.68
01.02.09
M2
15.05
67.77
1,019.94
0.00
1,019.94
0.00
0.00
0.00
0.00
1,019.94
01.02.10
M2
41.60
18.30
761.28
0.00
0.00
761.28
0.00
0.00
0.00
761.28
01.02.11
M2
38.40
8.70
334.08
0.00
0.00
334.08
0.00
0.00
0.00
334.08
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
4.18
228.69
0.00
228.69
0.00
0.00
0.00
0.00
228.69
02.00.00
TRABAJOS PRELIMINARES
0.00
0.00
110,858.39
0.00
GLB
2.00
17,730.00
35,460.00
5,850.90
5,850.90
5,850.90
3,723.30
3,546.00
5,319.00
3,546.00
02.01.00
0.00
0.00
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
0.48
44,544.68
6,057.99
15,696.49
20,529.36
2,260.84
0.00
0.00
0.00
02.03.00
KM
37.24
473.49
17,632.77
2,381.65
6,271.38
7,788.91
1,190.83
0.00
0.00
0.00
02.04.00
KM
37.24
355.02
13,220.94
1,721.85
4,702.24
5,840.08
0.00
248.51
0.00
354.66
0.00
0.00
1,956,817.70
0.00
0.00
0.00
5,817.94
0.00
738.00
6.70
4,944.60
03.00.00
03.01.00
03.01.01
M3
03.01.02
M3
32.80
7.88
258.46
39.40
03.01.03
M3
126.00
4.88
614.88
73.20
0.00
0.00
187,878.69
0.00
13,558.65
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
M3
19,111.91
3.43
65,553.85
03.02.02
M3
87.70
14.56
1,276.91
03.02.03
M3
87.70
4.88
427.98
03.02.04
M3
1,638.50
4.70
7,700.95
35,460.00
44,544.68
17,632.77
353.59
13,220.94
0.00
0.00
1,654.90
5,536.13
1,773.00
1,849.20
1,440.50
0.00
0.00
0.00
4,944.60
219.06
0.00
0.00
0.00
0.00
0.00
258.46
0.00
541.68
0.00
0.00
0.00
0.00
614.88
25,092.86
26,902.34
0.00
0.00
0.00
0.00
65,553.85
1,165.09
0.00
111.82
0.00
0.00
0.00
1,276.91
390.50
0.00
37.48
0.00
0.00
0.00
427.98
2,164.82
0.00
0.00
0.00
0.00
0.00
7,700.95
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
03.02.05
M3
851.29
6.70
5,703.64
804.00
0.00
0.00
4,093.70
805.94
0.00
0.00
5,703.64
03.02.06
M3
21,970.36
4.88
107,215.36
16,250.74
28,552.88
59,720.66
2,691.08
0.00
0.00
0.00
107,215.36
0.00
0.00
639,446.88
0.00
0.00
0.00
153,146.41
0.00
03.03.00
03.03.01
03.03.01.01
03.03.01.02
M2
130,381.78
0.91
118,647.42
M3
0.00
0.00
36,419.36
50,820.68
11,256.70
20,150.68
0.00
0.00
118,647.42
10,589.63
14,777.09
3,273.10
5,859.17
0.00
0.00
34,498.99
3,911.45
8.82
34,498.99
0.00
0.00
1,050.13
0.00
M3
17.71
8.57
151.77
0.00
0.00
0.00
0.00
0.00
151.77
0.00
151.77
03.03.02.02
M3
17.71
1.96
34.71
0.00
0.00
0.00
0.00
0.00
34.71
0.00
34.71
03.03.02.03
M3
17.71
3.29
58.27
0.00
0.00
0.00
0.00
0.00
58.27
0.00
58.27
03.03.02.04
M2
604.48
1.20
725.38
0.00
0.00
0.00
0.00
0.00
725.38
0.00
725.38
M3
9.07
8.82
80.00
0.00
0.00
0.00
0.00
0.00
80.00
0.00
80.00
0.00
0.00
466,114.75
0.00
4,274.97
0.00
23,007.88
66,973.91
90,379.65
10,227.57
194,863.97
44,566.32
03.03.02
03.03.02.01
03.03.02.05
03.03.03
03.03.03.01
0.00
0.00
M3
22,737.92
8.57
194,863.97
03.03.03.02
M3
22,737.92
1.96
44,566.32
977.71
0.00
5,262.01
15,317.25
20,670.26
2,339.09
03.03.03.03
M3
22,737.92
3.29
74,807.76
1,641.15
0.00
8,832.66
25,711.10
34,696.50
3,926.34
74,807.76
03.03.03.04
M2
126,321.78
1.07
135,164.30
2,965.26
0.00
15,959.05
46,240.82
58,820.58
11,178.59
135,164.30
M3
1,894.83
8.82
16,712.40
366.64
0.00
748.82
5,717.44
7,272.86
2,606.64
16,712.40
0.00
0.00
19,135.59
0.00
03.03.03.05
03.03.04
03.03.04.01
0.00
M3
974.40
8.57
8,350.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,350.61
8,350.61
03.03.04.02
M3
974.40
1.96
1,909.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,909.82
1,909.82
03.03.04.03
M3
974.40
3.29
3,205.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,205.78
3,205.78
03.03.04.04
M2
4,060.00
1.22
4,953.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,953.20
4,953.20
03.03.04.05
M3
81.20
8.82
716.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
716.18
0.00
0.00
88,147.73
0.00
15,387.20
13,782.65
0.00
0.00
48,709.48
17,337.27
03.04.00
716.18
0.00
03.04.01
ML
41,279.22
1.18
48,709.48
14,224.49
5,315.14
03.04.02
ML
41,279.22
0.42
17,337.27
5,062.95
7,957.87
0.00
4,316.45
0.00
0.00
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
0.82
4,762.56
1,226.72
2,148.40
426.40
328.00
633.04
0.00
03.04.04
ML
400.00
27.45
10,980.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,980.00
10,980.00
03.04.05
M2
410.00
13.47
5,522.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,522.70
5,522.70
4,762.56
OBRA
UBICACIN
ITEM
PART
03.04.06
03.05.00
DESCRIPCION
JUNTA ASFALTICA E=1"
CANAL DE DRENAJE PLUVIAL (0.50x0.70)
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
0.00
0.00
0.00
0.00
0.00
0.00
835.72
835.72
0.00
0.00
0.00
0.00
121.85
121.85
148.97
5.61
835.72
0.00
0.00
0.00
106,179.16
0.00
MES 8
1/2 MES 9
TOTAL
0.00
03.05.01
M2
507.70
0.24
121.85
0.00
0.00
0.00
03.05.02
TRAZO Y REPLANTEO
M2
749.62
4.36
3,268.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,268.34
3,268.34
03.05.03
M3
156.68
17.76
2,782.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,782.64
2,782.64
03.05.04
M2
348.89
0.79
275.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
275.62
03.05.05
M3
195.85
7.00
1,370.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,370.95
1,370.95
03.05.06
M3
173.59
312.29
54,210.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54,210.42
54,210.42
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
30.65
31,232.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,232.35
31,232.35
03.05.08
346.00
5.61
1,941.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,941.06
1,941.06
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
4.18
10,975.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,975.93
10,975.93
0.00
0.00
759.00
508.53
0.00
0.00
0.00
03.06.00
03.06.01
03.06.02
0
ML
0
0.00
0.00
37,365.98
167.00
7.59
1,267.53
275.62
0.00
1,267.53
0.00
0.00
4,631.59
03.06.02.01
M2
284.00
0.24
68.16
0.00
0.00
0.00
31.68
0.00
0.00
0.00
36.48
0.00
03.06.02.02
M3
193.12
14.88
2,873.63
0.00
0.00
1,335.63
0.00
0.00
0.00
1,538.00
2,873.63
03.06.02.03
M3
241.40
7.00
1,689.80
0.00
0.00
785.40
0.00
0.00
0.00
904.40
1,689.80
03.06.03
0.00
0.00
195.04
0.00
68.16
0.00
03.06.03.01
M2
25.00
0.24
6.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
6.00
03.06.03.02
M3
8.00
14.88
119.04
0.00
0.00
0.00
119.04
0.00
0.00
0.00
119.04
03.06.03.03
M3
10.00
7.00
70.00
0.00
0.00
0.00
70.00
0.00
0.00
0.00
70.00
03.06.04
0.00
0.00
540.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.40
0.00
0.00
0.00
0.00
0.00
0.00
334.80
334.80
0.00
0.00
0.00
0.00
0.00
0.00
196.91
196.91
0.00
0.00
0.00
2.40
03.06.04.01
M2
35.00
0.24
8.40
03.06.04.02
M3
22.50
14.88
334.80
03.06.04.03
M3
28.13
7.00
196.91
0.00
0.00
6,521.22
03.06.05
0.00
0.00
8.40
0.00
03.06.05.01
M2
10.00
0.24
2.40
0.00
0.00
03.06.05.02
M3
13.60
14.88
202.37
0.00
0.00
0.00
0.00
0.00
202.37
202.37
2.40
03.06.05.03
M3
3.84
60.70
233.09
0.00
0.00
0.00
0.00
0.00
233.09
233.09
03.06.05.04
M3
21.80
7.00
152.60
0.00
0.00
0.00
0.00
0.00
152.60
152.60
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
0.00
0.00
0.00
0.00
0.00
434.12
0.00
0.00
0.00
590.23
03.06.05.05
M3
2.14
202.86
434.12
03.06.05.06
M3
1.89
312.29
590.23
0.00
0.00
03.06.05.07
M3
4.91
338.36
1,661.35
0.00
0.00
0.00
0.00
0.00
1,661.35
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
18.00
30.65
551.70
0.00
0.00
0.00
0.00
0.00
551.70
03.06.05.09
TARRAJEO Y ACABADOS
M2
9.00
18.84
169.56
0.00
0.00
0.00
0.00
0.00
169.56
03.06.05.10
ACERO FY=4200KG/CM2
Kg
603.78
4.18
2,523.80
0.00
0.00
0.00
0.00
0.00
2,523.80
10.80
0.00
0.00
0.00
03.06.06
1/2 MES 9
TOTAL
434.12
590.23
1,661.35
551.70
169.56
2,523.80
0.00
0.00
15,755.17
0.00
03.06.06.01
M2
45.00
0.24
10.80
0.00
0.00
0.00
03.06.06.02
M3
25.50
14.88
379.44
0.00
0.00
0.00
379.44
0.00
0.00
0.00
379.44
03.06.06.03
M3
19.50
60.70
1,183.65
0.00
0.00
0.00
1,183.65
0.00
0.00
0.00
1,183.65
03.06.06.04
M3
54.00
7.00
378.00
0.00
0.00
0.00
378.00
0.00
0.00
0.00
378.00
03.06.06.05
M3
42.71
202.86
8,664.15
0.00
0.00
0.00
8,664.15
0.00
0.00
0.00
8,664.15
03.06.06.06
M3
15.75
319.17
5,026.93
0.00
0.00
0.00
5,026.93
0.00
0.00
0.00
5,026.93
03.06.06.07
20.00
5.61
112.20
0.00
0.00
0.00
112.20
0.00
0.00
0.00
112.20
0.00
0.00
8,455.32
0.00
0.00
0.00
0.00
0.00
1.08
0.00
12.90
13.98
573.83
03.06.07
MES 8
0.00
10.80
0.00
03.06.07.01
M2
58.25
0.24
13.98
03.06.07.02
M3
32.31
17.76
573.83
0.00
0.00
0.00
0.00
0.00
42.62
0.00
531.21
03.06.07.03
M3
40.38
7.00
282.66
0.00
0.00
0.00
0.00
0.00
36.96
0.00
245.70
282.66
03.06.07.04
M3
5.81
239.28
1,390.22
0.00
0.00
0.00
0.00
0.00
574.27
0.00
815.95
1,390.22
03.06.07.05
M3
1.82
351.71
640.11
0.00
0.00
0.00
0.00
0.00
527.57
0.00
112.55
640.12
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
30.65
997.04
0.00
0.00
0.00
0.00
0.00
222.21
0.00
774.83
997.04
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
4.18
1,705.02
0.00
0.00
0.00
0.00
0.00
803.51
0.00
901.51
1,705.02
0.00
0.00
0.00
0.00
335.02
0.00
2,517.44
2,852.46
03.06.07.08
59.60
47.86
2,852.46
0.00
03.07.00
0.00
0.00
828,105.38
0.00
03.07.01
0.00
0.00
146,404.78
0.00
03.07.01.01
M2
931.50
0.24
223.56
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
4.36
1,883.26
03.07.01.03
M3
392.69
17.76
6,974.17
03.07.01.04
M3
490.87
7.00
3,436.09
03.07.01.05
M3
217.83
22.17
4,829.29
0.00
0.00
0.00
0.00
6.26
52.06
0.00
0.00
34.14
457.15
0.00
0.00
69.26
1,749.72
0.00
0.00
22.89
875.00
0.00
0.00
57.86
1,201.84
48.60
116.64
223.56
409.40
982.57
1,883.26
1,515.82
3,639.38
6,974.17
746.90
1,791.30
3,436.09
1,049.75
2,519.84
4,829.29
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
0.00
0.00
272.19
1,740.75
1,677.45
4,015.33
213.00
1,515.36
1,440.31
3,448.62
6,617.29
18,022.26
34,511.17
03.07.01.06
M3
36.52
211.00
7,705.72
03.07.01.07
M3
32.62
202.86
6,617.29
0.00
0.00
03.07.01.08
M3
110.51
312.29
34,511.17
0.00
0.00
327.90
8,666.05
7,494.96
03.07.01.09
M3
31.47
338.36
10,648.19
0.00
0.00
223.32
2,558.00
2,317.77
5,549.10
10,648.19
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
30.65
32,463.56
0.00
0.00
799.97
7,668.63
7,057.16
16,937.80
32,463.56
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
18.84
5,483.76
0.00
0.00
24.30
1,406.78
1,192.57
2,860.10
5,483.76
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
4.18
31,628.72
0.00
0.00
436.14
7,814.93
6,875.89
16,501.76
31,628.72
42.92
49.06
24.53
91.98
85.85
03.07.02
0.00
0.00
330,263.11
0.00
03.07.02.01
M2
1,277.50
0.24
306.60
12.26
0.00
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
4.36
3,075.98
123.04
0.00
430.64
492.16
246.08
922.79
861.27
3,075.98
03.07.02.03
M3
690.36
17.76
12,260.79
490.35
0.00
1,716.86
1,962.12
981.06
3,678.98
3,431.41
12,260.79
03.07.02.04
M3
862.95
7.00
6,040.65
241.64
0.00
845.74
966.56
483.28
1,812.30
1,691.13
6,040.65
03.07.02.05
M3
316.20
22.17
7,010.15
140.11
980.80
1,261.03
560.46
2,101.72
1,966.04
7,010.15
03.07.02.06
M3
83.21
211.00
17,557.31
350.26
2,451.82
3,152.34
1,401.04
5,253.90
4,947.95
17,557.31
03.07.02.07
M3
35.45
202.86
7,191.39
144.03
1,008.21
1,296.28
576.12
2,160.46
2,006.29
7,191.39
03.07.02.08
M3
288.41
312.29
90,067.56
1,801.91
12,613.39
16,217.22
7,207.65
27,028.70
25,198.68
90,067.56
03.07.02.09
M3
68.42
338.36
23,150.59
460.17
3,221.19
4,141.53
1,840.68
6,902.54
6,584.49
23,150.59
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
30.65
71,003.79
1,420.01
9,940.10
12,780.13
5,680.06
21,300.22
19,883.27
71,003.79
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
18.84
11,300.23
225.89
1,581.24
2,033.02
903.57
3,388.37
3,168.13
11,300.23
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
4.18
81,298.07
1,625.98
11,381.85
14,633.80
6,503.91
24,389.67
22,762.86
81,298.07
8.83
26.50
88.32
136.90
88.32
30.91
379.78
03.07.03
7,705.72
0.00
0.00
306.60
0.00
0.00
222,183.56
03.07.03.01
M2
1,582.40
0.24
379.78
0.00
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
4.36
3,192.78
74.29
222.88
742.94
1,151.56
742.94
258.16
3,192.78
03.07.03.03
M3
501.83
17.76
8,912.50
207.44
622.31
2,074.37
3,215.27
2,074.37
718.75
8,912.50
03.07.03.04
M3
627.29
7.00
4,391.03
102.06
306.18
1,020.60
1,581.93
1,020.60
359.66
4,391.03
03.07.03.05
M3
263.72
22.17
5,846.67
136.12
408.37
1,361.24
2,109.92
1,361.24
469.78
5,846.67
03.07.03.06
M3
10.16
211.00
2,143.76
50.64
151.92
506.40
784.92
506.40
143.48
2,143.76
03.07.03.07
M3
59.43
202.86
12,055.97
279.95
839.84
2,799.47
4,339.18
2,799.47
998.07
12,055.97
03.07.03.08
M3
168.68
312.29
52,677.08
1,224.18
3,672.53
12,241.77
18,974.74
12,241.77
4,322.09
52,677.08
03.07.03.09
M3
73.14
338.36
24,747.65
575.21
1,725.64
5,752.12
8,915.79
5,752.12
2,026.78
24,747.65
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
30.65
58,659.20
1,363.93
4,091.78
13,639.25
21,140.84
13,639.25
4,784.16
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
18.84
5,768.05
134.14
402.42
1,341.41
2,079.18
1,341.41
469.49
5,768.05
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
4.18
43,409.09
1,009.55
3,028.66
10,095.54
15,648.08
10,095.54
3,531.72
43,409.09
10.69
0.00
0.00
0.00
0.00
21.38
03.07.04
0.00
0.00
18,422.69
0.00
03.07.04.01
M2
89.10
0.24
21.38
10.69
0.00
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
4.36
177.89
88.94
0.00
88.95
0.00
0.00
0.00
0.00
177.89
03.07.04.03
M3
43.50
17.76
772.56
386.28
0.00
386.28
0.00
0.00
0.00
0.00
772.56
03.07.04.04
M3
54.38
7.00
380.66
190.33
0.00
190.33
0.00
0.00
0.00
0.00
380.66
03.07.04.05
M3
26.00
22.17
576.42
0.00
288.21
288.21
0.00
0.00
0.00
0.00
576.42
03.07.04.06
M3
3.84
211.00
810.24
0.00
405.12
405.12
0.00
0.00
0.00
0.00
810.24
03.07.04.07
M3
3.44
202.86
697.84
0.00
348.92
348.92
0.00
0.00
0.00
0.00
697.84
03.07.04.08
M3
12.58
312.29
3,928.61
0.00
1,964.30
1,964.30
0.00
0.00
0.00
0.00
3,928.61
03.07.04.09
M3
3.65
338.36
1,235.01
0.00
619.20
615.82
0.00
0.00
0.00
0.00
1,235.01
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
30.65
3,766.89
0.00
1,883.44
1,883.44
0.00
0.00
0.00
0.00
3,766.89
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
18.84
656.76
0.00
328.38
328.38
0.00
0.00
0.00
0.00
656.76
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
4.18
5,398.43
0.00
2,699.24
2,699.19
0.00
0.00
0.00
0.00
5,398.43
0.00
12.00
0.00
19.51
0.00
0.00
03.07.05
58,659.20
0.00
0.00
0.00
103,730.02
0.00
03.07.05.01
M2
731.50
0.24
175.56
57.60
0.00
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
4.36
2,126.07
1,046.40
0.00
176.58
0.00
236.23
0.00
0.00
03.07.05.03
M3
447.68
17.76
7,950.80
0.00
2,498.83
829.39
0.00
883.42
0.00
0.00
03.07.05.04
M3
537.22
7.00
3,760.54
0.00
1,576.68
394.80
0.00
417.84
0.00
0.00
117.74
1,253.48
3,760.54
03.07.05.05
M3
258.26
202.86
52,390.62
0.00
18,977.55
6,197.37
0.00
5,821.18
0.00
0.00
3,931.42
17,463.09
52,390.62
03.07.05.06
M3
76.97
319.17
24,566.51
0.00
9,255.93
2,872.53
0.00
2,729.61
0.00
0.00
1,519.24
8,189.19
24,566.51
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
30.65
12,111.96
0.00
1,869.65
887.32
0.00
1,345.77
0.00
0.00
3,971.93
4,037.29
12,111.96
03.07.05.08
115.50
5.61
647.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
431.98
215.99
7.79
0.00
0.00
0.00
18.00
197.51
27.93
58.52
175.56
109.00
557.86
2,126.07
1,088.87
2,650.29
7,950.80
647.97
03.07.06
0.00
0.00
2,875.19
0.00
03.07.06.01
M2
75.00
0.24
18.00
10.21
0.00
0.00
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
4.36
197.51
111.18
0.00
0.00
86.33
0.00
0.00
0.00
03.07.06.03
M3
8.33
17.76
147.94
147.94
0.00
0.00
0.00
0.00
0.00
0.00
147.94
03.07.06.04
M3
24.40
59.99
1,463.76
0.00
0.00
0.00
0.00
0.00
0.00
1,463.76
1,463.76
0.00
OBRA
UBICACIN
ITEM
PART
03.07.06.05
03.07.07
DESCRIPCION
RELLENO COMPACTADO CON MATERIAL SELECCIONADO
MURO DE CONTENCION CC - 24.00 ML
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
M3
47.27
22.17
1,047.98
0.00
0.00
4,226.03
0.00
6.40
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
487.74
0.00
560.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.68
122.08
1,047.98
0.00
03.07.07.01
M2
32.00
0.24
7.68
0.00
1.28
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
4.36
122.08
101.73
0.00
20.35
0.00
0.00
0.00
0.00
03.07.07.03
M3
4.88
17.76
86.67
86.67
0.00
0.00
0.00
0.00
0.00
0.00
86.67
03.07.07.04
M3
16.32
22.17
361.81
0.00
0.00
361.81
0.00
0.00
0.00
0.00
361.81
03.07.07.05
M3
12.78
166.28
2,125.06
0.00
2,125.06
0.00
0.00
0.00
0.00
0.00
2,125.06
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
44.93
30.65
1,377.10
0.00
1,377.10
0.00
0.00
0.00
0.00
0.00
1,377.10
03.07.07.07
16.40
8.88
145.63
0.00
0.00
145.63
0.00
0.00
0.00
0.00
145.63
0.00
0.00
63,875.94
0.00
0.00
0.00
20,065.30
0.00
0.24
15.30
0.00
0.00
0.00
0.00
0.00
0.00
9.18
03.08.00
03.08.01
0.00
0.00
03.08.01.01
M2
63.75
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
4.36
84.50
0.00
0.00
0.00
0.00
0.00
0.00
50.70
33.80
84.50
03.08.01.03
M3
8.75
17.76
155.40
0.00
0.00
0.00
0.00
0.00
0.00
93.24
62.16
155.40
03.08.01.04
M3
10.94
7.00
76.58
0.00
0.00
0.00
0.00
0.00
0.00
45.95
03.08.01.05
M3
9.19
202.86
1,864.28
0.00
0.00
0.00
0.00
0.00
0.00
1,118.57
03.08.01.06
M3
3.96
328.33
1,300.19
0.00
0.00
0.00
0.00
0.00
0.00
03.08.01.07
M2
100.50
47.81
4,804.91
0.00
0.00
0.00
0.00
0.00
0.00
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
4.18
1,110.12
0.00
0.00
0.00
0.00
0.00
0.00
03.08.01.09
M2
81.00
8.67
702.27
0.00
0.00
0.00
0.00
0.00
03.08.01.10
UND
25.00
398.07
9,951.75
0.00
0.00
0.00
0.00
03.08.02
6.12
15.30
30.63
76.58
350.00
395.71
1,864.28
780.11
230.00
290.08
1,300.19
2,882.94
1,100.00
821.97
4,804.91
666.07
220.00
224.05
1,110.12
0.00
421.36
245.00
35.91
0.00
0.00
5,971.05
1,990.00
1,990.70
0.00
0.00
0.00
5.62
1.60
2.14
9.36
702.27
9,951.75
0.00
0.00
22,295.89
0.00
03.08.02.01
M2
39.00
0.24
9.36
0.00
0.00
0.00
0.00
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
4.36
42.51
0.00
0.00
0.00
0.00
0.00
0.00
25.51
8.90
8.10
42.51
03.08.02.03
M3
6.83
17.76
121.30
0.00
0.00
0.00
0.00
0.00
0.00
72.78
25.00
23.52
121.30
03.08.02.04
M3
8.53
7.00
59.71
0.00
0.00
0.00
0.00
0.00
0.00
35.83
11.50
12.38
59.71
03.08.02.05
M3
7.17
202.86
1,454.51
0.00
0.00
0.00
0.00
0.00
0.00
872.70
289.00
292.81
1,454.51
03.08.02.06
M3
3.09
328.33
1,014.54
0.00
0.00
0.00
0.00
0.00
0.00
608.72
210.00
195.82
1,014.54
03.08.02.07
M2
78.39
47.81
3,747.83
0.00
0.00
0.00
0.00
0.00
0.00
2,248.70
740.00
759.13
3,747.83
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
4.18
1,731.82
0.00
0.00
0.00
0.00
0.00
0.00
1,039.09
380.00
312.73
1,731.82
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
03.08.02.09
03.08.02.10
03.08.03
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
0.00
0.00
0.00
0.00
0.00
328.66
110.00
109.11
0.00
0.00
0.00
0.00
0.00
8,139.92
2,580.00
2,846.62
0.00
0.00
0.00
4.61
1.55
1.52
7.68
M2
63.18
8.67
547.77
0.00
UND
39.00
347.86
13,566.54
0.00
0.00
0.00
17,561.69
0.00
MES 7
MES 8
1/2 MES 9
TOTAL
547.77
13,566.54
0.00
03.08.03.01
M2
32.00
0.24
7.68
0.00
0.00
0.00
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
4.36
34.88
0.00
0.00
0.00
0.00
0.00
0.00
20.93
7.00
6.95
34.88
03.08.03.03
M3
5.60
17.76
99.46
0.00
0.00
0.00
0.00
0.00
0.00
59.67
21.50
18.29
99.46
03.08.03.04
M3
7.00
7.00
49.00
0.00
0.00
0.00
0.00
0.00
0.00
29.40
9.98
9.62
03.08.03.05
M3
5.88
202.86
1,192.82
0.00
0.00
0.00
0.00
0.00
0.00
715.69
235.00
242.13
03.08.03.06
M3
2.53
328.33
830.67
0.00
0.00
0.00
0.00
0.00
0.00
498.40
166.00
166.27
830.67
03.08.03.07
M2
64.32
47.81
3,075.14
0.00
0.00
0.00
0.00
0.00
0.00
1,845.08
620.00
610.06
3,075.14
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
4.18
1,420.99
0.00
0.00
0.00
0.00
0.00
0.00
852.59
280.00
288.40
1,420.99
03.08.03.09
M2
51.84
8.67
449.45
0.00
0.00
0.00
0.00
0.00
0.00
269.67
88.00
91.78
03.08.03.10
UND
32.00
325.05
10,401.60
0.00
0.00
0.00
0.00
0.00
0.00
6,240.96
2,050.00
2,110.64
03.08.04
449.45
10,401.60
0.00
0.00
3,953.06
0.00
03.08.04.01
M2
33.00
0.24
7.92
0.00
0.00
0.00
0.00
0.00
0.00
7.92
7.92
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
4.36
35.97
0.00
0.00
0.00
0.00
0.00
0.00
35.97
35.97
03.08.04.03
M3
4.13
17.76
73.35
0.00
0.00
0.00
0.00
0.00
0.00
73.35
73.35
03.08.04.04
M3
5.16
7.00
36.12
0.00
0.00
0.00
0.00
0.00
0.00
36.12
36.12
03.08.04.05
M3
3.45
202.86
699.87
0.00
0.00
0.00
0.00
0.00
0.00
699.87
699.87
03.08.04.06
M3
2.62
328.33
860.22
0.00
0.00
0.00
0.00
315.20
545.03
0.00
860.22
03.08.04.07
M2
25.34
47.81
1,211.51
0.00
0.00
0.00
0.00
441.76
769.74
0.00
1,211.51
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
4.18
478.40
0.00
0.00
0.00
0.00
478.42
0.00
0.00
478.42
03.08.04.09
M2
16.37
33.58
549.70
0.00
0.00
0.00
0.00
0.00
549.70
0.00
549.70
0.00
0.00
323,424.74
0.00
0.00
0.00
24,487.06
0.00
04.00.00
04.01.00
49.00
1,192.82
04.01.01
M3
2,614.20
3.43
8,966.71
0.00
04.01.02
M3
15.84
4.70
74.45
0.00
04.01.03
M2
3,645.00
0.91
3,316.95
0.00
04.01.04
M3
2,485.44
4.88
12,128.95
0.00
0.00
0.00
238,135.92
0.00
04.02.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,966.71
8,966.71
0.00
0.00
0.00
0.00
0.00
0.00
74.45
0.00
0.00
0.00
0.00
0.00
0.00
3,316.95
3,316.95
0.00
0.00
0.00
0.00
0.00
0.00
12,128.95
12,128.95
74.45
0.00
OBRA
UBICACIN
ITEM
PART
04.02.01
DESCRIPCION
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
0.00
0.00
0.00
0.00
5,664.43
5,664.43
0.00
0.00
13,549.32
0.00
M3
660.96
8.57
5,664.43
0.00
0.00
0.00
04.02.01.02
M3
660.96
1.96
1,295.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,295.48
1,295.48
04.02.01.03
M3
660.96
3.29
2,174.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,174.56
2,174.56
04.02.01.04
M2
3,672.00
1.07
3,929.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,929.04
3,929.04
04.02.01.05
M3
55.08
8.82
485.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
485.81
0.00
0.00
69,203.98
0.00
68,556.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68,556.24
0.00
0.00
0.00
0.00
0.00
0.00
647.74
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
PRECIO
UNITARIO
04.02.01.01
04.02.02
UNID.
METRADO
MEDIDA
M2
3,672.00
18.67
M3
73.44
8.82
647.74
0.00
0.00
0.00
153,980.21
0.00
0.00
485.81
0.00
68,556.24
647.74
0.00
M2
3,685.50
6.17
22,739.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22,739.54
22,739.54
04.02.03.02
M2
3,685.50
33.85
124,754.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
124,754.18
124,754.18
04.02.03.03
M2
3,685.50
0.27
995.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
995.09
04.02.03.04
M2
3,685.50
1.49
5,491.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,491.40
5,491.40
1,390.50
04.02.04
04.02.04.01
04.02.04.02
0.00
0.00
1,402.41
0.00
M2
270.00
5.15
1,390.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,390.50
0.00
0.00
0.00
0.00
0.00
0.00
11.91
995.09
0.00
M3
1.35
8.82
11.91
0.00
04.03.00
0.00
0.00
60,801.76
0.00
04.03.01
0.00
0.00
10,473.61
0.00
0.24
10.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.91
0.00
0.00
04.03.01.01
M2
45.76
10.98
10.98
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
4.36
97.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97.49
97.49
04.03.01.03
M3
32.04
17.76
569.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
569.03
569.03
04.03.01.04
M2
9.24
0.78
7.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.21
04.03.01.05
M3
2.22
80.23
178.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
178.11
178.11
04.03.01.06
M3
24.52
22.17
543.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
543.61
543.61
04.03.01.07
M3
0.69
5.33
3.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.68
04.03.01.08
M3
14.84
7.00
103.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
103.88
04.03.01.09
8.19
338.76
2,774.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,774.44
04.03.01.10
M3
0.86
211.00
181.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
181.46
181.46
04.03.01.11
M3
3.46
202.86
701.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
701.90
701.90
7.21
3.68
103.88
2,774.44
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
04.03.01.12
M3
1.39
265.03
368.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
368.39
04.03.01.13
M3
4.17
319.17
1,330.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,330.94
1,330.94
04.03.01.14
M2
48.29
38.76
1,871.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,871.72
1,871.72
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
18.84
357.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
357.77
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
4.18
1,373.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,373.00
04.03.02
357.77
1,373.00
0.00
0.00
826.18
0.00
04.03.02.01
M2
25.94
0.24
6.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.23
6.23
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
4.36
55.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.02
55.02
04.03.02.03
M3
9.43
17.76
167.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
167.48
167.48
04.03.02.04
M3
11.79
7.00
82.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.53
82.53
04.03.02.05
M3
1.18
202.86
239.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
239.37
239.37
04.03.02.06
M3
0.88
265.03
233.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
233.23
233.23
04.03.02.07
M2
5.44
7.78
42.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.32
42.32
0.00
0.00
39,396.35
0.00
1.18
1,274.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,274.40
04.03.03
368.39
0.00
0.00
04.03.03.01
ML
1,080.00
04.03.03.02
ML
1,080.00
0.42
453.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
453.60
04.03.03.03
ML
1,080.00
27.45
29,646.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29,646.00
29,646.00
04.03.03.04
M2
420.15
13.47
5,659.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,659.42
5,659.42
04.03.03.05
421.20
5.61
2,362.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,362.93
2,362.93
0.00
0.00
10,105.62
0.00
140.00
16.90
2,366.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,366.00
2,366.00
0.00
0.00
0.00
0.00
0.00
0.00
4,107.04
4,107.04
0.00
0.00
0.00
0.00
0.00
0.00
3,632.58
3,632.58
04.03.04
04.03.04.01
M2
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
73.34
4,107.04
0.00
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
9.61
3,632.58
0.00
0.00
0.00
84,424.91
0.00
0.00
0.00
24,000.00
0.00
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
MES
6.00
4,000.00
24,000.00
05.02.00
PROGRAMA DE SEALIZACION
0.00
0.00
5,768.56
UND
28.00
206.02
5,768.56
0.00
0.00
4,278.04
0.00
HA
0.95
4,503.20
4,278.04
0.00
05.02.01
05.03.00
05.03.01
1,274.40
453.60
0.00
0.00
0.00
0.00
0.00
0.00
20,000.00
0.00
0.00
4,000.00
24,000.00
0.00
0.00
3,708.36
1,030.10
0.00
0.00
1,030.10
5,768.56
0.00
0.00
4,278.04
0.00
0.00
0.00
0.00
0.00
0.00
4,278.04
OBRA
UBICACIN
ITEM
PART
05.04.00
DESCRIPCION
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
0.00
0.00
0.00
0.00
6,500.00
5,924.75
12,424.75
0.00
0.00
46,878.31
0.00
05.04.01
KM
37.24
333.64
12,424.75
0.00
0.00
0.00
05.04.02
M2
3,000.00
1.14
3,420.00
0.00
0.00
0.00
1,368.00
912.00
0.00
0.00
740.00
400.00
3,420.00
05.04.03
M3
80.00
30.23
2,418.40
0.00
0.00
0.00
906.90
906.90
0.00
0.00
310.00
294.60
2,418.40
05.04.04
M2
6,650.00
1.03
6,849.50
0.00
0.00
0.00
2,060.00
2,060.00
0.00
0.00
1,580.00
1,149.50
05.04.05
M3
24,455.80
0.89
21,765.66
0.00
0.00
0.00
13,350.00
3,965.66
4,450.00
0.00
0.00
0.00
0.00
2,450.00
350.00
350.00
0.00
05.05.00
05.05.01
06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.02.03
06.03.00
06.03.01
06.03.02
07.00.00
07.01.00
07.02.00
08.00.00
08.01.00
09.00.00
09.01.00
UNID.
METRADO
MEDIDA
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
PRUEBAS, ENSAYOS Y CONTROL DE CALIDAD
PRUEBAS DE COMPACTACION EN SUB BASE Y BASE GRANULAR
0.00
0.00
3,500.00
GLB
1.00
3,500.00
3,500.00
0.00
0.00
9,927.66
0.00
0.00
0.00
6,896.43
0.00
6,699.96
UND
111.00
60.36
UND
3.00
65.49
196.47
0.00
0.00
0.00
1,584.00
0.00
UND
5.00
160.72
803.60
UND
5.00
90.72
UND
5.00
65.36
0.00
UND
0.00
6,849.50
21,765.66
0.00
350.00
3,500.00
0.00
0.00
0.00
603.60
1,810.80
1,871.16
1,207.20
0.00
650.00
557.20
6,699.96
0.00
0.00
0.00
0.00
0.00
0.00
100.00
96.47
196.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
803.60
803.60
453.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
453.60
453.60
326.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
326.80
326.80
0.00
1,447.23
0.00
30.00
40.24
1,207.20
0.00
0.00
603.60
402.40
201.20
0.00
0.00
1,207.20
UND
1.00
240.03
240.03
0.00
0.00
0.00
240.03
0.00
0.00
240.03
0.00
0.00
56,804.00
0.00
GLB
1.00
4,500.00
4,500.00
0.00
0.00
0.00
3,150.00
0.00
0.00
1,350.00
HA
0.56
93,400.00
52,304.00
0.00
0.00
0.00
0.00
0.00
0.00
52,304.00
0.00
0.00
990.80
0.00
UND
1.00
990.80
990.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
990.80
990.80
0.00
0.00
32,796.77
0.00
GLB
1.00
32,796.77
32,796.77
8,199.19
0.00
3,279.68
8,199.19
6,559.35
3,279.68
0.00
2,500.00
779.68
32,796.77
2,588,467.75
67,176.13
228,826.27
302,574.31
276,643.17
402,827.06
415,058.24
266,792.98
49,869.03
578,700.68
2,588,467.87
2.60%
8.84%
11.69%
10.69%
15.56%
16.03%
10.31%
1.93%
22.36%
100.00%
2.60%
11.44%
23.12%
33.81%
49.37%
65.41%
75.72%
77.64%
98.07%
100.00%
45,741.82
24,040.29
31,790.84
29,071.35
42,315.27
43,593.43
27,630.03
27,630.03
135.96
271,949.02
271,949.02
0.00
0.00
0.00
4,500.00
52,304.00
0.00
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
43,370.00
2,903,786.77
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
MES 8
1/2 MES 9
TOTAL
16.82%
8.84%
11.69%
10.69%
15.56%
16.03%
10.16%
10.16%
0.05%
100.00%
1,125.54
3,833.91
5,069.95
4,636.25
6,748.37
6,952.21
4,406.39
4,406.39
6,190.99
43,370.00
2.60%
8.84%
11.69%
10.69%
15.56%
16.03%
10.16%
10.16%
14.27%
100.00%
114,043.49
256,700.47
339,435.10
310,350.77
451,890.70
465,603.88
298,829.40
81,905.45
585,027.51
2,903,786.77
100.00%
3.93%
8.84%
11.69%
10.69%
15.56%
16.03%
10.29%
2.82%
20.15%
114,043.49
370,743.96
710,179.06
1,020,529.83
1,472,420.53
1,938,024.41
2,236,853.81
2,318,759.26
2,903,786.77
3.93%
12.77%
24.46%
35.14%
50.71%
66.74%
77.03%
79.85%
100.00%
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
01.00.00
DESCRIPCION
Unidad
Metrado
P. Unitario
OBRAS PROVISIONALES
01.01.00
01.02.00
Precio
12,422.78
UND
2.00
4,253.97
8,507.94
3,914.84
01.02.01
M2
15.30
0.24
3.67
01.02.02
TRAZO Y REPLANTEO
M2
6.00
4.36
26.16
01.02.03
M3
4.80
17.76
85.25
01.02.04
M3
6.00
7.00
42.00
01.02.05
M3
4.52
133.79
604.73
01.02.06
M3
0.45
215.83
97.12
01.02.07
M3
1.16
319.17
370.24
01.02.08
M2
12.85
26.59
341.68
01.02.09
M2
15.05
67.77
1,019.94
01.02.10
M2
41.60
18.30
761.28
01.02.11
M2
38.40
8.70
334.08
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
4.18
02.00.00
TRABAJOS PRELIMINARES
228.69
110,858.39
02.01.00
2.00
17,730.00
35,460.00
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
0.48
44,544.68
02.03.00
KM
37.24
473.49
17,632.77
02.04.00
KM
37.24
355.02
03.00.00
03.01.00
GLB
13,220.94
1,956,817.70
5,817.94
03.01.01
M3
738.00
6.70
4,944.60
03.01.02
M3
32.80
7.88
258.46
03.01.03
M3
126.00
4.88
03.02.00
MOVIMIENTO DE TIERRAS
614.88
187,878.69
03.02.01
M3
19,111.91
3.43
65,553.85
03.02.02
M3
87.70
14.56
1,276.91
03.02.03
M3
87.70
4.88
427.98
03.02.04
M3
1,638.50
4.70
7,700.95
03.02.05
M3
851.29
6.70
5,703.64
03.02.06
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
21,970.36
4.88
107,215.36
03.03.00
03.03.01
639,446.88
153,146.41
03.03.01.01
M2
130,381.78
0.91
118,647.42
03.03.01.02
M3
3,911.45
8.82
34,498.99
03.03.02
1,050.13
03.03.02.01
M3
17.71
8.57
151.77
03.03.02.02
M3
17.71
1.96
34.71
03.03.02.03
M3
17.71
3.29
58.27
03.03.02.04
M2
604.48
1.20
725.38
M3
9.07
8.82
03.03.02.05
03.03.03
80.00
466,114.75
03.03.03.01
M3
22,737.92
8.57
194,863.97
03.03.03.02
M3
22,737.92
1.96
44,566.32
03.03.03.03
M3
22,737.92
3.29
74,807.76
03.03.03.04
M2
126,321.78
1.07
135,164.30
M3
1,894.83
8.82
16,712.40
03.03.03.05
03.03.04
19,135.59
03.03.04.01
M3
974.40
8.57
8,350.61
03.03.04.02
M3
974.40
1.96
1,909.82
03.03.04.03
M3
974.40
3.29
3,205.78
03.03.04.04
M2
4,060.00
1.22
4,953.20
03.03.04.05
M3
81.20
8.82
03.04.00
716.18
88,147.73
03.04.01
ML
41,279.22
1.18
48,709.48
03.04.02
ML
41,279.22
0.42
17,337.27
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
0.82
4,762.56
03.04.04
ML
400.00
27.45
10,980.00
03.04.05
M2
410.00
13.47
5,522.70
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
03.04.06
03.05.00
DESCRIPCION
JUNTA ASFALTICA E=1"
Unidad
m
Metrado
148.97
P. Unitario
5.61
Precio
835.72
106,179.16
03.05.01
M2
507.70
0.24
121.85
03.05.02
TRAZO Y REPLANTEO
M2
749.62
4.36
3,268.34
03.05.03
M3
156.68
17.76
2,782.64
03.05.04
M2
348.89
0.79
275.62
03.05.05
M3
195.85
7.00
1,370.95
03.05.06
M3
173.59
312.29
54,210.42
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
30.65
31,232.35
03.05.08
346.00
5.61
1,941.06
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
4.18
10,975.93
ML
167.00
7.59
03.06.00
03.06.01
03.06.02
37,365.98
1,267.53
4,631.59
03.06.02.01
M2
284.00
0.24
68.16
03.06.02.02
M3
193.12
14.88
2,873.63
03.06.02.03
M3
241.40
7.00
1,689.80
03.06.03
195.04
03.06.03.01
M2
25.00
0.24
6.00
03.06.03.02
M3
8.00
14.88
119.04
03.06.03.03
M3
10.00
7.00
03.06.04
70.00
540.11
03.06.04.01
M2
35.00
0.24
8.40
03.06.04.02
M3
22.50
14.88
334.80
M3
28.13
7.00
03.06.04.03
03.06.05
196.91
6,521.22
03.06.05.01
M2
10.00
0.24
2.40
03.06.05.02
M3
13.60
14.88
202.37
03.06.05.03
M3
3.84
60.70
233.09
03.06.05.04
M3
21.80
7.00
152.60
03.06.05.05
M3
2.14
202.86
434.12
03.06.05.06
M3
1.89
312.29
590.23
03.06.05.07
M3
4.91
338.36
1,661.35
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
18.00
30.65
551.70
03.06.05.09
TARRAJEO Y ACABADOS
M2
9.00
18.84
169.56
03.06.05.10
ACERO FY=4200KG/CM2
Kg
603.78
4.18
2,523.80
03.06.06
15,755.17
03.06.06.01
M2
45.00
0.24
10.80
03.06.06.02
M3
25.50
14.88
379.44
03.06.06.03
M3
19.50
60.70
1,183.65
03.06.06.04
M3
54.00
7.00
378.00
03.06.06.05
M3
42.71
202.86
8,664.15
03.06.06.06
M3
15.75
319.17
5,026.93
03.06.06.07
20.00
5.61
03.06.07
112.20
8,455.32
03.06.07.01
M2
58.25
0.24
13.98
03.06.07.02
M3
32.31
17.76
573.83
03.06.07.03
M3
40.38
7.00
282.66
03.06.07.04
M3
5.81
239.28
1,390.22
03.06.07.05
M3
1.82
351.71
640.11
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
30.65
997.04
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
4.18
1,705.02
03.06.07.08
59.60
47.86
03.07.00
03.07.01
2,852.46
828,105.38
146,404.78
03.07.01.01
M2
931.50
0.24
223.56
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
4.36
1,883.26
03.07.01.03
M3
392.69
17.76
6,974.17
03.07.01.04
M3
490.87
7.00
3,436.09
03.07.01.05
M3
217.83
22.17
4,829.29
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
DESCRIPCION
Unidad
Metrado
P. Unitario
Precio
03.07.01.06
M3
36.52
211.00
03.07.01.07
M3
32.62
202.86
6,617.29
03.07.01.08
M3
110.51
312.29
34,511.17
03.07.01.09
M3
31.47
338.36
10,648.19
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
30.65
32,463.56
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
18.84
5,483.76
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
4.18
31,628.72
03.07.02
7,705.72
330,263.11
03.07.02.01
M2
1,277.50
0.24
306.60
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
4.36
3,075.98
03.07.02.03
M3
690.36
17.76
12,260.79
03.07.02.04
M3
862.95
7.00
6,040.65
03.07.02.05
M3
316.20
22.17
7,010.15
03.07.02.06
M3
83.21
211.00
17,557.31
03.07.02.07
M3
35.45
202.86
7,191.39
03.07.02.08
M3
288.41
312.29
90,067.56
03.07.02.09
M3
68.42
338.36
23,150.59
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
30.65
71,003.79
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
18.84
11,300.23
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
4.18
81,298.07
03.07.03
222,183.56
03.07.03.01
M2
1,582.40
0.24
379.78
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
4.36
3,192.78
03.07.03.03
M3
501.83
17.76
8,912.50
03.07.03.04
M3
627.29
7.00
4,391.03
03.07.03.05
M3
263.72
22.17
5,846.67
03.07.03.06
M3
10.16
211.00
2,143.76
03.07.03.07
M3
59.43
202.86
12,055.97
03.07.03.08
M3
168.68
312.29
52,677.08
03.07.03.09
M3
73.14
338.36
24,747.65
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
30.65
58,659.20
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
18.84
5,768.05
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
4.18
43,409.09
03.07.04
18,422.69
03.07.04.01
M2
89.10
0.24
21.38
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
4.36
177.89
03.07.04.03
M3
43.50
17.76
772.56
03.07.04.04
M3
54.38
7.00
380.66
03.07.04.05
M3
26.00
22.17
576.42
03.07.04.06
M3
3.84
211.00
810.24
03.07.04.07
M3
3.44
202.86
697.84
03.07.04.08
M3
12.58
312.29
3,928.61
03.07.04.09
M3
3.65
338.36
1,235.01
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
30.65
3,766.89
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
18.84
656.76
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
4.18
5,398.43
03.07.05
103,730.02
03.07.05.01
M2
731.50
0.24
175.56
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
4.36
2,126.07
03.07.05.03
M3
447.68
17.76
7,950.80
03.07.05.04
M3
537.22
7.00
3,760.54
03.07.05.05
M3
258.26
202.86
52,390.62
03.07.05.06
M3
76.97
319.17
24,566.51
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
30.65
12,111.96
03.07.05.08
115.50
5.61
03.07.06
647.96
2,875.19
03.07.06.01
M2
75.00
0.24
18.00
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
4.36
197.51
03.07.06.03
M3
8.33
17.76
147.94
03.07.06.04
M3
24.40
59.99
1,463.76
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
03.07.06.05
03.07.07
DESCRIPCION
RELLENO COMPACTADO CON MATERIAL SELECCIONADO
Unidad
Metrado
P. Unitario
M3
47.27
22.17
Precio
1,047.98
4,226.03
03.07.07.01
M2
32.00
0.24
7.68
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
4.36
122.08
03.07.07.03
M3
4.88
17.76
86.67
03.07.07.04
M3
16.32
22.17
361.81
03.07.07.05
M3
12.78
166.28
2,125.06
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
44.93
30.65
1,377.10
03.07.07.07
16.40
8.88
03.08.00
03.08.01
145.63
63,875.94
20,065.30
03.08.01.01
M2
63.75
0.24
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
4.36
84.50
03.08.01.03
M3
8.75
17.76
155.40
03.08.01.04
M3
10.94
7.00
76.58
03.08.01.05
M3
9.19
202.86
1,864.28
03.08.01.06
M3
3.96
328.33
1,300.19
03.08.01.07
M2
100.50
47.81
4,804.91
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
4.18
1,110.12
03.08.01.09
M2
81.00
8.67
702.27
03.08.01.10
UND
25.00
398.07
9,951.75
03.08.02
15.30
22,295.89
03.08.02.01
M2
39.00
0.24
9.36
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
4.36
42.51
03.08.02.03
M3
6.83
17.76
121.30
03.08.02.04
M3
8.53
7.00
59.71
03.08.02.05
M3
7.17
202.86
1,454.51
03.08.02.06
M3
3.09
328.33
1,014.54
03.08.02.07
M2
78.39
47.81
3,747.83
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
4.18
1,731.82
03.08.02.09
M2
63.18
8.67
547.77
03.08.02.10
UND
39.00
347.86
13,566.54
03.08.03
17,561.69
03.08.03.01
M2
32.00
0.24
7.68
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
4.36
34.88
03.08.03.03
M3
5.60
17.76
99.46
03.08.03.04
M3
7.00
7.00
49.00
03.08.03.05
M3
5.88
202.86
1,192.82
03.08.03.06
M3
2.53
328.33
830.67
03.08.03.07
M2
64.32
47.81
3,075.14
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
4.18
1,420.99
03.08.03.09
M2
51.84
8.67
449.45
03.08.03.10
UND
32.00
325.05
10,401.60
03.08.04
3,953.06
03.08.04.01
M2
33.00
0.24
7.92
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
4.36
35.97
03.08.04.03
M3
4.13
17.76
73.35
03.08.04.04
M3
5.16
7.00
36.12
03.08.04.05
M3
3.45
202.86
699.87
03.08.04.06
M3
2.62
328.33
860.22
03.08.04.07
M2
25.34
47.81
1,211.51
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
4.18
478.40
03.08.04.09
M2
16.37
33.58
04.00.00
04.01.00
549.70
323,424.74
MOVIMIENTO DE TIERRAS
24,487.06
04.01.01
M3
2,614.20
3.43
04.01.02
M3
15.84
4.70
74.45
04.01.03
M2
3,645.00
0.91
3,316.95
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
2,485.44
4.88
04.01.04
04.02.00
8,966.71
12,128.95
238,135.92
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
04.02.01
DESCRIPCION
Unidad
Metrado
P. Unitario
Precio
13,549.32
04.02.01.01
M3
660.96
8.57
5,664.43
04.02.01.02
M3
660.96
1.96
1,295.48
04.02.01.03
M3
660.96
3.29
2,174.56
04.02.01.04
M2
3,672.00
1.07
3,929.04
04.02.01.05
M3
55.08
8.82
04.02.02
04.02.02.01
M2
3,672.00
18.67
04.02.02.02
M3
73.44
8.82
04.02.03
485.81
69,203.98
68,556.24
647.74
153,980.21
04.02.03.01
M2
3,685.50
6.17
22,739.54
04.02.03.02
M2
3,685.50
33.85
124,754.18
04.02.03.03
M2
3,685.50
0.27
995.09
04.02.03.04
M2
3,685.50
1.49
5,491.40
04.02.04
1,402.41
04.02.04.01
M2
270.00
5.15
04.02.04.02
M3
1.35
8.82
04.03.00
04.03.01
1,390.50
11.91
60,801.76
10,473.61
04.03.01.01
M2
45.76
0.24
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
4.36
10.98
97.49
04.03.01.03
M3
32.04
17.76
569.03
04.03.01.04
M2
9.24
0.78
7.21
04.03.01.05
M3
2.22
80.23
178.11
04.03.01.06
M3
24.52
22.17
543.61
04.03.01.07
M3
0.69
5.33
3.68
04.03.01.08
M3
14.84
7.00
103.88
04.03.01.09
8.19
338.76
2,774.44
04.03.01.10
M3
0.86
211.00
181.46
04.03.01.11
M3
3.46
202.86
701.90
04.03.01.12
M3
1.39
265.03
368.39
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
DESCRIPCION
Unidad
Metrado
P. Unitario
Precio
04.03.01.13
M3
4.17
319.17
1,330.94
04.03.01.14
M2
48.29
38.76
1,871.72
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
18.84
357.77
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
4.18
1,373.00
04.03.02
826.18
04.03.02.01
M2
25.94
0.24
6.23
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
4.36
55.02
04.03.02.03
M3
9.43
17.76
167.48
04.03.02.04
M3
11.79
7.00
82.53
04.03.02.05
M3
1.18
202.86
239.37
04.03.02.06
M3
0.88
265.03
233.23
04.03.02.07
M2
5.44
7.78
04.03.03
42.32
39,396.35
04.03.03.01
ML
1,080.00
1.18
04.03.03.02
ML
1,080.00
0.42
453.60
04.03.03.03
ML
1,080.00
27.45
29,646.00
04.03.03.04
M2
420.15
13.47
5,659.42
04.03.03.05
421.20
5.61
04.03.04
1,274.40
2,362.93
10,105.62
04.03.04.01
PINTURA EN PAVIMENTO
M2
140.00
16.90
2,366.00
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
73.34
4,107.04
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
9.61
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
05.02.00
PROGRAMA DE SEALIZACION
05.02.01
05.03.00
05.03.01
05.04.00
3,632.58
84,424.91
24,000.00
MES
6.00
4,000.00
UND
28.00
206.02
HA
0.95
4,503.20
24,000.00
5,768.56
5,768.56
4,278.04
4,278.04
46,878.31
05.04.01
KM
37.24
333.64
12,424.75
05.04.02
M2
3,000.00
1.14
3,420.00
05.04.03
M3
80.00
30.23
2,418.40
05.04.04
M2
6,650.00
1.03
6,849.50
05.04.05
M3
24,455.80
0.89
21,765.66
1.00
3,500.00
05.05.00
05.05.01
06.00.00
06.01.00
PLAN DE CONTINGENCIAS
3,500.00
PLAN DE CONTINGENCIAS
GLB
3,500.00
9,927.66
6,896.43
06.01.01
UND
111.00
60.36
06.01.02
UND
3.00
65.49
6,699.96
196.47
06.02.00
1,584.00
06.02.01
UND
5.00
160.72
803.60
06.02.02
UND
5.00
90.72
453.60
06.02.03
UND
5.00
65.36
326.80
06.03.00
1,447.23
06.03.01
UND
30.00
40.24
06.03.02
UND
1.00
240.03
07.00.00
07.01.00
07.02.00
08.00.00
08.01.00
09.00.00
09.01.00
GLB
1.00
4,500.00
4,500.00
HA
0.56
93,400.00
52,304.00
UND
1.00
990.80
990.80
FLETE
FLETE TERRESTRE
240.03
56,804.00
OTROS
MURO - PLACA RECORDATORIA DE BRONCE 0.40X0.60
1,207.20
990.80
32,796.77
GLB
1.00
32,796.77
32,796.77
2,588,467.75
271,949.02
43,370.00
PRESUPUESTO DE OBRA
PROYECTO
OBRA
UBICACIN
ITEM
DESCRIPCION
Unidad
Metrado
TOTAL PRESUPUESTO
SON: DOS MILLONES NOVECIENTOS TRES MIL SETECIENTOS OCHENTISEIS Y 77/100 NUEVOS SOLES
P. Unitario
Precio
2,903,786.77
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
OBRAS PROVISIONALES
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
0.00
12,422.78
0.00
01.01.00
UND
2.00
8,507.94
01.02.00
0.00
3,914.84
MES
MES
MES
MES
MES
MES
50.00%
50.00%
TOTAL %
100.00%
0.00%
01.02.01
M2
15.30
3.67
100.00%
100.00%
01.02.02
TRAZO Y REPLANTEO
M2
6.00
26.16
100.00%
100.00%
01.02.03
M3
4.80
85.25
100.00%
100.00%
01.02.04
M3
6.00
42.00
100.00%
100.00%
01.02.05
M3
4.52
604.73
100.00%
100.00%
01.02.06
M3
0.45
97.12
100.00%
100.00%
01.02.07
M3
1.16
370.24
100.00%
100.00%
01.02.08
M2
12.85
341.68
100.00%
100.00%
01.02.09
M2
15.05
1,019.94
100.00%
100.00%
01.02.10
M2
41.60
761.28
100.00%
100.00%
01.02.11
M2
38.40
334.08
100.00%
100.00%
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
228.69
100.00%
100.00%
02.00.00
TRABAJOS PRELIMINARES
0.00
110,858.39
GLB
2.00
35,460.00
50.00%
02.01.00
0.00%
50.00%
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
44,544.68
107
30.00%
30.00%
02.03.00
KM
37.24
17,632.77
22
60.00%
40.00%
02.04.00
KM
37.24
13,220.94
50
10.00%
20.00%
0.00
1,956,817.70
0.00
5,817.94
738.00
4,944.60
03.00.00
03.01.00
03.01.01
M3
03.01.02
M3
32.80
258.46
03.01.03
M3
126.00
614.88
0.00
187,878.69
03.02.00
MOVIMIENTO DE TIERRAS
30.00%
10.00%
20.00%
20.00%
100.00%
100.00%
100.00%
20.00%
10.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
30.00%
100.00%
0.00%
03.02.01
M3
19,111.91
65,553.85
28
40.00%
03.02.02
M3
87.70
1,276.91
100.00%
03.02.03
M3
87.70
427.98
100.00%
03.02.04
M3
1,638.50
7,700.95
40.00%
30.00%
30.00%
100.00%
03.02.05
M3
851.29
5,703.64
40.00%
30.00%
30.00%
100.00%
03.02.06
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
21,970.36
107,215.36
55
40.00%
30.00%
30.00%
100.00%
0.00
639,446.88
0.00
153,146.41
03.03.00
03.03.01
03.03.01.01
03.03.01.02
30.00%
100.00%
100.00%
0.00%
0.00%
M2
130,381.78
118,647.42
42
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
M3
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
3,911.45
34,498.99
43
0.00
1,050.13
M3
17.71
151.77
100.00%
100.00%
03.03.02.02
M3
17.71
34.71
100.00%
100.00%
03.03.02.03
M3
17.71
58.27
100.00%
100.00%
03.03.02.04
M2
604.48
725.38
100.00%
100.00%
03.03.02.05
M3
9.07
80.00
100.00%
100.00%
0.00
466,114.75
03.03.02
03.03.02.01
03.03.03
03.03.03.01
0.00%
0.00%
M3
22,737.92
194,863.97
40
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.02
M3
22,737.92
44,566.32
29
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.03
M3
22,737.92
74,807.76
72
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.04
M2
126,321.78
135,164.30
45
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.05
M3
1,894.83
16,712.40
21
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
0.00
19,135.59
03.03.04
03.03.04.01
0.00%
M3
974.40
8,350.61
60.00%
40.00%
100.00%
03.03.04.02
M3
974.40
1,909.82
60.00%
40.00%
100.00%
03.03.04.03
M3
974.40
3,205.78
60.00%
40.00%
100.00%
03.03.04.04
M2
4,060.00
4,953.20
60.00%
40.00%
100.00%
03.03.04.05
M3
81.20
716.18
60.00%
40.00%
100.00%
0.00
88,147.73
03.04.00
0.00%
03.04.01
ML
41,279.22
48,709.48
918
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.02
ML
41,279.22
17,337.27
69
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
4,762.56
90
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.04
ML
400.00
10,980.00
100.00%
100.00%
03.04.05
M2
410.00
5,522.70
19
100.00%
100.00%
03.04.06
148.97
835.72
100.00%
100.00%
0.00
106,179.16
0
3
40.00%
60.00%
100.00%
03.05.00
0.00%
03.05.01
M2
507.70
121.85
03.05.02
TRAZO Y REPLANTEO
M2
749.62
3,268.34
40.00%
60.00%
100.00%
03.05.03
M3
156.68
2,782.64
53
40.00%
60.00%
100.00%
03.05.04
M2
348.89
275.62
40.00%
60.00%
100.00%
03.05.05
M3
195.85
1,370.95
31
40.00%
60.00%
100.00%
03.05.06
M3
173.59
54,210.42
11
40.00%
60.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
31,232.35
73
40.00%
60.00%
100.00%
03.05.08
346.00
1,941.06
40.00%
60.00%
100.00%
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
10,975.93
14
40.00%
60.00%
100.00%
0.00
37,365.98
167.00
1,267.53
03.06.00
03.06.01
03.06.02
0
ML
0
0.00%
20.00%
30.00%
30.00%
20.00%
100.00%
0.00
4,631.59
03.06.02.01
M2
284.00
68.16
20.00%
20.00%
20.00%
20.00%
20.00%
100.00%
0.00%
03.06.02.02
M3
193.12
2,873.63
65
20.00%
20.00%
20.00%
20.00%
20.00%
100.00%
03.06.02.03
M3
241.40
1,689.80
38
20.00%
20.00%
20.00%
20.00%
20.00%
100.00%
03.06.03
0.00
195.04
25.00
6.00
100.00%
100.00%
0.00%
03.06.03.01
M2
03.06.03.02
M3
8.00
119.04
100.00%
100.00%
03.06.03.03
M3
10.00
70.00
100.00%
100.00%
03.06.04
0.00
540.11
0.00%
03.06.04.01
M2
35.00
8.40
50.00%
50.00%
100.00%
03.06.04.02
M3
22.50
334.80
50.00%
50.00%
100.00%
03.06.04.03
M3
28.13
196.91
50.00%
50.00%
100.00%
0.00
6,521.22
03.06.05
0.00%
03.06.05.01
M2
10.00
2.40
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.02
M3
13.60
202.37
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.03
M3
3.84
233.09
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.04
M3
21.80
152.60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.05
M3
2.14
434.12
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.06
M3
1.89
590.23
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.07
M3
4.91
1,661.35
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
18.00
551.70
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.09
TARRAJEO Y ACABADOS
M2
9.00
169.56
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.10
ACERO FY=4200KG/CM2
Kg
603.78
2,523.80
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
15,755.17
10.80
100.00%
100.00%
03.06.06
0.00%
03.06.06.01
M2
45.00
03.06.06.02
M3
25.50
379.44
100.00%
100.00%
03.06.06.03
M3
19.50
1,183.65
26
100.00%
100.00%
03.06.06.04
M3
54.00
378.00
100.00%
100.00%
03.06.06.05
M3
42.71
8,664.15
100.00%
100.00%
03.06.06.06
M3
15.75
5,026.93
100.00%
100.00%
03.06.06.07
20.00
112.20
100.00%
100.00%
0.00
8,455.32
03.06.07
0.00%
03.06.07.01
M2
58.25
13.98
100.00%
100.00%
03.06.07.02
M3
32.31
573.83
11
100.00%
100.00%
03.06.07.03
M3
40.38
282.66
100.00%
100.00%
03.06.07.04
M3
5.81
1,390.22
100.00%
100.00%
03.06.07.05
M3
1.82
640.11
100.00%
100.00%
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
997.04
100.00%
100.00%
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
1,705.02
100.00%
100.00%
03.06.07.08
59.60
2,852.46
100.00%
100.00%
03.07.00
0.00
828,105.38
03.07.01
0.00
146,404.78
0.00%
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00%
03.07.01.01
M2
931.50
223.56
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
1,883.26
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.03
M3
392.69
6,974.17
131
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.04
M3
490.87
3,436.09
76
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.05
M3
217.83
4,829.29
19
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.06
M3
36.52
7,705.72
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.07
M3
32.62
6,617.29
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.08
M3
110.51
34,511.17
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.09
M3
31.47
10,648.19
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
32,463.56
76
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
5,483.76
30
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
31,628.72
38
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
330,263.11
306.60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02
0.00%
03.07.02.01
M2
1,277.50
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
3,075.98
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.03
M3
690.36
12,260.79
231
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.04
M3
862.95
6,040.65
133
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.05
M3
316.20
7,010.15
27
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.06
M3
83.21
17,557.31
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.07
M3
35.45
7,191.39
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.08
M3
288.41
90,067.56
19
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.09
M3
68.42
23,150.59
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
71,003.79
166
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
11,300.23
60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
81,298.07
98
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
222,183.56
0
8
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03
0.00%
03.07.03.01
M2
1,582.40
379.78
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
3,192.78
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.03
M3
501.83
8,912.50
168
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.04
M3
627.29
4,391.03
97
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.05
M3
263.72
5,846.67
22
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.06
M3
10.16
2,143.76
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.07
M3
59.43
12,055.97
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.08
M3
168.68
52,677.08
11
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.09
M3
73.14
24,747.65
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
58,659.20
137
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
5,768.05
31
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
43,409.09
52
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
18,422.69
0
1
50.00%
50.00%
100.00%
03.07.04
0.00%
03.07.04.01
M2
89.10
21.38
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
177.89
50.00%
50.00%
100.00%
03.07.04.03
M3
43.50
772.56
15
50.00%
50.00%
100.00%
03.07.04.04
M3
54.38
380.66
50.00%
50.00%
100.00%
03.07.04.05
M3
26.00
576.42
50.00%
50.00%
100.00%
03.07.04.06
M3
3.84
810.24
50.00%
50.00%
100.00%
03.07.04.07
M3
3.44
697.84
50.00%
50.00%
100.00%
03.07.04.08
M3
12.58
3,928.61
50.00%
50.00%
100.00%
03.07.04.09
M3
3.65
1,235.01
50.00%
50.00%
100.00%
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
3,766.89
50.00%
50.00%
100.00%
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
656.76
50.00%
50.00%
100.00%
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
5,398.43
50.00%
50.00%
100.00%
0.00
103,730.02
0
4
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05
0.00%
03.07.05.01
M2
731.50
175.56
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
2,126.07
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.03
M3
447.68
7,950.80
150
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.04
M3
537.22
3,760.54
83
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.05
M3
258.26
52,390.62
15
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.06
M3
76.97
24,566.51
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
12,111.96
29
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.08
115.50
647.96
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.06
0.00
2,875.19
03.07.06.01
M2
75.00
18.00
100.00%
100.00%
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
197.51
100.00%
100.00%
03.07.06.03
M3
8.33
147.94
100.00%
100.00%
03.07.06.04
M3
24.40
1,463.76
100.00%
100.00%
03.07.06.05
M3
47.27
1,047.98
100.00%
100.00%
0.00
4,226.03
03.07.07
0.00%
0.00%
03.07.07.01
M2
32.00
7.68
100.00%
100.00%
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
122.08
100.00%
100.00%
03.07.07.03
M3
4.88
86.67
100.00%
100.00%
03.07.07.04
M3
16.32
361.81
100.00%
100.00%
03.07.07.05
M3
12.78
2,125.06
100.00%
100.00%
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
44.93
1,377.10
100.00%
100.00%
03.07.07.07
16.40
145.63
100.00%
100.00%
0.00
63,875.94
0.00
20,065.30
15.30
40.00%
60.00%
100.00%
03.08.00
03.08.01
0.00%
0.00%
03.08.01.01
M2
63.75
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
84.50
40.00%
60.00%
100.00%
03.08.01.03
M3
8.75
155.40
40.00%
60.00%
100.00%
03.08.01.04
M3
10.94
76.58
40.00%
60.00%
100.00%
03.08.01.05
M3
9.19
1,864.28
40.00%
60.00%
100.00%
03.08.01.06
M3
3.96
1,300.19
40.00%
60.00%
100.00%
03.08.01.07
M2
100.50
4,804.91
11
40.00%
60.00%
100.00%
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
1,110.12
40.00%
60.00%
100.00%
03.08.01.09
M2
81.00
702.27
40.00%
60.00%
100.00%
03.08.01.10
UND
25.00
9,951.75
40.00%
60.00%
100.00%
0.00
22,295.89
9.36
40.00%
60.00%
100.00%
03.08.02
0.00%
03.08.02.01
M2
39.00
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
42.51
40.00%
60.00%
100.00%
03.08.02.03
M3
6.83
121.30
40.00%
60.00%
100.00%
03.08.02.04
M3
8.53
59.71
40.00%
60.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.08.02.05
M3
7.17
1,454.51
40.00%
60.00%
100.00%
03.08.02.06
M3
3.09
1,014.54
40.00%
60.00%
100.00%
03.08.02.07
M2
78.39
3,747.83
40.00%
60.00%
100.00%
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
1,731.82
40.00%
60.00%
100.00%
03.08.02.09
M2
63.18
547.77
40.00%
60.00%
100.00%
03.08.02.10
UND
39.00
13,566.54
40.00%
60.00%
100.00%
0.00
17,561.69
03.08.03
0.00%
03.08.03.01
M2
32.00
7.68
40.00%
60.00%
100.00%
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
34.88
40.00%
60.00%
100.00%
03.08.03.03
M3
5.60
99.46
40.00%
60.00%
100.00%
03.08.03.04
M3
7.00
49.00
40.00%
60.00%
100.00%
03.08.03.05
M3
5.88
1,192.82
40.00%
60.00%
100.00%
03.08.03.06
M3
2.53
830.67
40.00%
60.00%
100.00%
03.08.03.07
M2
64.32
3,075.14
40.00%
60.00%
100.00%
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
1,420.99
40.00%
60.00%
100.00%
03.08.03.09
M2
51.84
449.45
40.00%
60.00%
100.00%
03.08.03.10
UND
32.00
10,401.60
40.00%
60.00%
100.00%
0.00
3,953.06
03.08.04
0.00%
03.08.04.01
M2
33.00
7.92
40.00%
60.00%
100.00%
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
35.97
40.00%
60.00%
100.00%
03.08.04.03
M3
4.13
73.35
40.00%
60.00%
100.00%
03.08.04.04
M3
5.16
36.12
40.00%
60.00%
100.00%
03.08.04.05
M3
3.45
699.87
40.00%
60.00%
100.00%
03.08.04.06
M3
2.62
860.22
40.00%
60.00%
100.00%
03.08.04.07
M2
25.34
1,211.51
40.00%
60.00%
100.00%
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
478.40
40.00%
60.00%
100.00%
03.08.04.09
M2
16.37
549.70
40.00%
60.00%
100.00%
0.00
323,424.74
0.00
24,487.06
2,614.20
8,966.71
100.00%
04.00.00
04.01.00
0.00%
0.00%
04.01.01
M3
04.01.02
M3
15.84
74.45
100.00%
04.01.03
M2
3,645.00
3,316.95
60.00%
04.01.04
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
2,485.44
12,128.95
04.02.00
0.00
238,135.92
0.00
13,549.32
04.02.01
04.02.01.01
100.00%
100.00%
40.00%
100.00%
100.00%
100.00%
0.00%
0.00%
M3
660.96
5,664.43
60.00%
40.00%
100.00%
04.02.01.02
M3
660.96
1,295.48
60.00%
40.00%
100.00%
04.02.01.03
M3
660.96
2,174.56
60.00%
40.00%
100.00%
04.02.01.04
M2
3,672.00
3,929.04
60.00%
40.00%
100.00%
04.02.01.05
M3
55.08
485.81
60.00%
40.00%
100.00%
0.00
69,203.98
68,556.24
60.00%
40.00%
100.00%
60.00%
40.00%
100.00%
100.00%
04.02.02
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
M2
3,672.00
M3
73.44
647.74
0.00
153,980.21
0.00%
0.00%
M2
3,685.50
22,739.54
100.00%
04.02.03.02
M2
3,685.50
124,754.18
40.00%
60.00%
100.00%
04.02.03.03
M2
3,685.50
995.09
40.00%
60.00%
100.00%
04.02.03.04
M2
3,685.50
5,491.40
40.00%
60.00%
100.00%
0.00
1,402.41
1,390.50
100.00%
100.00%
100.00%
100.00%
04.02.04
04.02.04.01
04.02.04.02
M2
270.00
0.00%
M3
1.35
11.91
04.03.00
0.00
60,801.76
04.03.01
0.00
10,473.61
10.98
100.00%
100.00%
0.00%
0.00%
04.03.01.01
M2
45.76
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
97.49
100.00%
100.00%
04.03.01.03
M3
32.04
569.03
11
100.00%
100.00%
04.03.01.04
M2
9.24
7.21
100.00%
100.00%
04.03.01.05
M3
2.22
178.11
100.00%
100.00%
04.03.01.06
M3
24.52
543.61
100.00%
100.00%
04.03.01.07
M3
0.69
3.68
100.00%
100.00%
04.03.01.08
M3
14.84
103.88
100.00%
100.00%
04.03.01.09
8.19
2,774.44
100.00%
100.00%
04.03.01.10
M3
0.86
181.46
100.00%
100.00%
04.03.01.11
M3
3.46
701.90
100.00%
100.00%
04.03.01.12
M3
1.39
368.39
100.00%
100.00%
04.03.01.13
M3
4.17
1,330.94
100.00%
100.00%
04.03.01.14
M2
48.29
1,871.72
100.00%
100.00%
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
357.77
100.00%
100.00%
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
1,373.00
100.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
DESFOGUE CUNETAS HACIA ALCANTARILLA RIB STEEL
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
TOTAL %
0.00
826.18
6.23
100.00%
100.00%
0.00%
04.03.02.01
M2
25.94
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
55.02
100.00%
100.00%
04.03.02.03
M3
9.43
167.48
100.00%
100.00%
04.03.02.04
M3
11.79
82.53
100.00%
100.00%
04.03.02.05
M3
1.18
239.37
100.00%
100.00%
04.03.02.06
M3
0.88
233.23
100.00%
100.00%
04.03.02.07
M2
5.44
42.32
100.00%
100.00%
0.00
39,396.35
1,274.40
24
60.00%
40.00%
100.00%
04.03.03
0.00%
04.03.03.01
ML
1,080.00
04.03.03.02
ML
1,080.00
453.60
60.00%
40.00%
100.00%
04.03.03.03
ML
1,080.00
29,646.00
60.00%
40.00%
100.00%
04.03.03.04
M2
420.15
5,659.42
20
60.00%
40.00%
100.00%
04.03.03.05
421.20
2,362.93
60.00%
40.00%
100.00%
0.00
10,105.62
140.00
2,366.00
100.00%
100.00%
04.03.04
04.03.04.01
M2
0.00%
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
4,107.04
100.00%
100.00%
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
3,632.58
100.00%
100.00%
0.00
84,424.91
0.00
24,000.00
MES
6.00
24,000.00
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
05.02.00
PROGRAMA DE SEALIZACION
05.02.01
05.03.00
05.03.01
05.04.00
0.00
5,768.56
28.00
5,768.56
0.00
4,278.04
HA
0.95
4,278.04
0.00%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00
46,878.31
05.04.01
KM
37.24
12,424.75
13
05.04.02
M2
3,000.00
3,420.00
50.00%
50.00%
100.00%
05.04.03
M3
80.00
2,418.40
20
50.00%
50.00%
100.00%
05.04.04
M2
6,650.00
6,849.50
100.00%
100.00%
05.04.05
M3
24,455.80
21,765.66
10
100.00%
100.00%
0.00
3,500.00
GLB
1.00
3,500.00
0.00
9,927.66
0.00
6,896.43
6,699.96
14
05.05.00
05.05.01
06.00.00
06.01.00
06.01.01
06.01.02
0
UND
0.00%
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
PRUEBAS, ENSAYOS Y CONTROL DE CALIDAD
PRUEBAS DE COMPACTACION EN SUB BASE Y BASE GRANULAR
PRUEBAS DE COMPACTACION EN SUB BASE
UND
111.00
UND
3.00
196.47
0.00
1,584.00
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
10.00%
20.00%
20.00%
60.00%
40.00%
20.00%
20.00%
10.00%
100.00%
100.00%
06.02.00
06.02.01
UND
5.00
803.60
40.00%
60.00%
100.00%
06.02.02
UND
5.00
453.60
40.00%
60.00%
100.00%
06.02.03
UND
5.00
326.80
40.00%
60.00%
100.00%
06.03.00
0.00
1,447.23
UND
30.00
1,207.20
10.00%
20.00%
20.00%
100.00%
06.03.01
06.03.02
UND
1.00
240.03
07.00.00
0.00
56,804.00
07.01.00
GLB
1.00
4,500.00
HA
0.56
52,304.00
0.00
990.80
UND
1.00
990.80
0.00
32,796.77
GLB
1.00
32,796.77
07.02.00
08.00.00
08.01.00
09.00.00
09.01.00
0.00%
0.00%
20.00%
20.00%
10.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
10.00%
100.00%
0.00%
20.00%
20.00%
20.00%
20.00%
10.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
OBRAS PROVISIONALES
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
0.00
12,422.78
0.00
01.01.00
UND
2.00
8,507.94
01.02.00
0.00
3,914.84
MES
MES
MES
MES
MES
MES
50.00%
50.00%
TOTAL %
100.00%
0.00%
01.02.01
M2
15.30
3.67
100.00%
100.00%
01.02.02
TRAZO Y REPLANTEO
M2
6.00
26.16
100.00%
100.00%
01.02.03
M3
4.80
85.25
100.00%
100.00%
01.02.04
M3
6.00
42.00
100.00%
100.00%
01.02.05
M3
4.52
604.73
100.00%
100.00%
01.02.06
M3
0.45
97.12
100.00%
100.00%
01.02.07
M3
1.16
370.24
100.00%
100.00%
01.02.08
M2
12.85
341.68
100.00%
100.00%
01.02.09
M2
15.05
1,019.94
100.00%
100.00%
01.02.10
M2
41.60
761.28
100.00%
100.00%
01.02.11
M2
38.40
334.08
100.00%
100.00%
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
228.69
100.00%
100.00%
02.00.00
TRABAJOS PRELIMINARES
0.00
110,858.39
GLB
2.00
35,460.00
50.00%
02.01.00
0.00%
50.00%
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
44,544.68
107
30.00%
30.00%
30.00%
02.03.00
KM
37.24
17,632.77
22
40.00%
40.00%
20.00%
02.04.00
KM
37.24
13,220.94
50
10.00%
20.00%
20.00%
0.00
1,956,817.70
0.00
5,817.94
738.00
4,944.60
03.00.00
03.01.00
03.01.01
M3
03.01.02
M3
32.80
258.46
03.01.03
M3
126.00
614.88
0.00
187,878.69
03.02.00
MOVIMIENTO DE TIERRAS
10.00%
100.00%
100.00%
100.00%
20.00%
20.00%
10.00%
100.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
03.02.01
M3
19,111.91
65,553.85
28
30.00%
30.00%
03.02.02
M3
87.70
1,276.91
0.00%
100.00%
03.02.03
M3
87.70
427.98
0.00%
100.00%
03.02.04
M3
1,638.50
7,700.95
40.00%
30.00%
30.00%
100.00%
03.02.05
M3
851.29
5,703.64
40.00%
30.00%
30.00%
100.00%
03.02.06
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
21,970.36
107,215.36
55
40.00%
30.00%
30.00%
100.00%
0.00
639,446.88
0.00
153,146.41
03.03.00
03.03.01
03.03.01.01
03.03.01.02
20.00%
20.00%
100.00%
100.00%
100.00%
0.00%
0.00%
M2
130,381.78
118,647.42
42
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
M3
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
3,911.45
34,498.99
43
0.00
1,050.13
M3
17.71
151.77
100.00%
100.00%
03.03.02.02
M3
17.71
34.71
100.00%
100.00%
03.03.02.03
M3
17.71
58.27
100.00%
100.00%
03.03.02.04
M2
604.48
725.38
100.00%
100.00%
03.03.02.05
M3
9.07
80.00
100.00%
100.00%
0.00
466,114.75
03.03.02
03.03.02.01
03.03.03
03.03.03.01
0.00%
0.00%
M3
22,737.92
194,863.97
40
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.02
M3
22,737.92
44,566.32
29
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.03
M3
22,737.92
74,807.76
72
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.04
M2
126,321.78
135,164.30
45
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.03.03.05
M3
1,894.83
16,712.40
21
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
0.00
19,135.59
03.03.04
03.03.04.01
0.00%
M3
974.40
8,350.61
60.00%
40.00%
100.00%
03.03.04.02
M3
974.40
1,909.82
60.00%
40.00%
100.00%
03.03.04.03
M3
974.40
3,205.78
60.00%
40.00%
100.00%
03.03.04.04
M2
4,060.00
4,953.20
60.00%
40.00%
100.00%
03.03.04.05
M3
81.20
716.18
60.00%
40.00%
100.00%
0.00
88,147.73
03.04.00
0.00%
03.04.01
ML
41,279.22
48,709.48
918
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.02
ML
41,279.22
17,337.27
69
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
4,762.56
90
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100.00%
03.04.04
ML
400.00
10,980.00
100.00%
03.04.05
M2
410.00
5,522.70
19
100.00%
03.04.06
148.97
835.72
0.00
106,179.16
0
3
03.05.00
100.00%
100.00%
100.00%
100.00%
40.00%
60.00%
100.00%
0.00%
03.05.01
M2
507.70
121.85
03.05.02
TRAZO Y REPLANTEO
M2
749.62
3,268.34
40.00%
60.00%
100.00%
03.05.03
M3
156.68
2,782.64
53
40.00%
60.00%
100.00%
03.05.04
M2
348.89
275.62
40.00%
60.00%
100.00%
03.05.05
M3
195.85
1,370.95
31
40.00%
60.00%
100.00%
03.05.06
M3
173.59
54,210.42
11
40.00%
60.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
31,232.35
73
40.00%
60.00%
100.00%
03.05.08
346.00
1,941.06
40.00%
60.00%
100.00%
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
10,975.93
14
40.00%
60.00%
100.00%
0.00
37,365.98
167.00
1,267.53
03.06.00
03.06.01
03.06.02
0
ML
0
0.00%
20.00%
30.00%
30.00%
20.00%
100.00%
0.00
4,631.59
03.06.02.01
M2
284.00
68.16
10.00%
30.00%
20.00%
20.00%
20.00%
100.00%
0.00%
03.06.02.02
M3
193.12
2,873.63
65
10.00%
30.00%
20.00%
20.00%
20.00%
100.00%
03.06.02.03
M3
241.40
1,689.80
38
10.00%
30.00%
20.00%
20.00%
20.00%
100.00%
03.06.03
0.00
195.04
25.00
6.00
100.00%
100.00%
0.00%
03.06.03.01
M2
03.06.03.02
M3
8.00
119.04
100.00%
100.00%
03.06.03.03
M3
10.00
70.00
100.00%
100.00%
03.06.04
0.00
540.11
0.00%
03.06.04.01
M2
35.00
8.40
50.00%
50.00%
100.00%
03.06.04.02
M3
22.50
334.80
50.00%
50.00%
100.00%
03.06.04.03
M3
28.13
196.91
50.00%
50.00%
100.00%
0.00
6,521.22
03.06.05
0.00%
03.06.05.01
M2
10.00
2.40
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.02
M3
13.60
202.37
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.03
M3
3.84
233.09
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.04
M3
21.80
152.60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.05
M3
2.14
434.12
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.06
M3
1.89
590.23
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.07
M3
4.91
1,661.35
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
18.00
551.70
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.09
TARRAJEO Y ACABADOS
M2
9.00
169.56
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.06.05.10
ACERO FY=4200KG/CM2
Kg
603.78
2,523.80
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
15,755.17
10.80
100.00%
100.00%
03.06.06
0.00%
03.06.06.01
M2
45.00
03.06.06.02
M3
25.50
379.44
100.00%
100.00%
03.06.06.03
M3
19.50
1,183.65
26
100.00%
100.00%
03.06.06.04
M3
54.00
378.00
100.00%
100.00%
03.06.06.05
M3
42.71
8,664.15
100.00%
100.00%
03.06.06.06
M3
15.75
5,026.93
100.00%
100.00%
03.06.06.07
20.00
112.20
100.00%
100.00%
0.00
8,455.32
03.06.07
0.00%
03.06.07.01
M2
58.25
13.98
100.00%
100.00%
03.06.07.02
M3
32.31
573.83
11
100.00%
100.00%
03.06.07.03
M3
40.38
282.66
100.00%
100.00%
03.06.07.04
M3
5.81
1,390.22
100.00%
100.00%
03.06.07.05
M3
1.82
640.11
100.00%
100.00%
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
997.04
100.00%
100.00%
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
1,705.02
100.00%
100.00%
03.06.07.08
59.60
2,852.46
100.00%
100.00%
03.07.00
0.00
828,105.38
03.07.01
0.00
146,404.78
0.00%
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00%
03.07.01.01
M2
931.50
223.56
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
1,883.26
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.03
M3
392.69
6,974.17
131
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.04
M3
490.87
3,436.09
76
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.05
M3
217.83
4,829.29
19
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.06
M3
36.52
7,705.72
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.07
M3
32.62
6,617.29
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.08
M3
110.51
34,511.17
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.09
M3
31.47
10,648.19
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
32,463.56
76
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
5,483.76
30
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
31,628.72
38
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
330,263.11
306.60
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02
0.00%
03.07.02.01
M2
1,277.50
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
3,075.98
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.03
M3
690.36
12,260.79
231
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.04
M3
862.95
6,040.65
133
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.05
M3
316.20
7,010.15
27
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.06
M3
83.21
17,557.31
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.07
M3
35.45
7,191.39
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.08
M3
288.41
90,067.56
19
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.09
M3
68.42
23,150.59
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
71,003.79
166
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
11,300.23
60
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
81,298.07
98
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
222,183.56
0
8
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03
0.00%
03.07.03.01
M2
1,582.40
379.78
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
3,192.78
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.03
M3
501.83
8,912.50
168
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.04
M3
627.29
4,391.03
97
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.05
M3
263.72
5,846.67
22
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.06
M3
10.16
2,143.76
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.07
M3
59.43
12,055.97
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.08
M3
168.68
52,677.08
11
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.09
M3
73.14
24,747.65
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
58,659.20
137
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
5,768.05
31
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
43,409.09
52
10.00%
30.00%
20.00%
20.00%
10.00%
10.00%
100.00%
0.00
18,422.69
0
1
50.00%
50.00%
100.00%
03.07.04
0.00%
03.07.04.01
M2
89.10
21.38
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
177.89
50.00%
50.00%
100.00%
03.07.04.03
M3
43.50
772.56
15
50.00%
50.00%
100.00%
03.07.04.04
M3
54.38
380.66
50.00%
50.00%
100.00%
03.07.04.05
M3
26.00
576.42
50.00%
50.00%
100.00%
03.07.04.06
M3
3.84
810.24
50.00%
50.00%
100.00%
03.07.04.07
M3
3.44
697.84
50.00%
50.00%
100.00%
03.07.04.08
M3
12.58
3,928.61
50.00%
50.00%
100.00%
03.07.04.09
M3
3.65
1,235.01
50.00%
50.00%
100.00%
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
3,766.89
50.00%
50.00%
100.00%
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
656.76
50.00%
50.00%
100.00%
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
5,398.43
50.00%
50.00%
100.00%
0.00
103,730.02
0
4
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05
0.00%
03.07.05.01
M2
731.50
175.56
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
2,126.07
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.03
M3
447.68
7,950.80
150
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.04
M3
537.22
3,760.54
83
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.05
M3
258.26
52,390.62
15
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.06
M3
76.97
24,566.51
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
12,111.96
29
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.05.08
115.50
647.96
10.00%
20.00%
20.00%
20.00%
30.00%
100.00%
03.07.06
0.00
2,875.19
03.07.06.01
M2
75.00
18.00
60.00%
40.00%
100.00%
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
197.51
60.00%
40.00%
100.00%
03.07.06.03
M3
8.33
147.94
60.00%
40.00%
100.00%
03.07.06.04
M3
24.40
1,463.76
60.00%
40.00%
100.00%
03.07.06.05
M3
47.27
1,047.98
60.00%
40.00%
100.00%
0.00
4,226.03
03.07.07
0.00%
0.00%
03.07.07.01
M2
32.00
7.68
100.00%
100.00%
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
122.08
100.00%
100.00%
03.07.07.03
M3
4.88
86.67
100.00%
100.00%
03.07.07.04
M3
16.32
361.81
100.00%
100.00%
03.07.07.05
M3
12.78
2,125.06
100.00%
100.00%
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
44.93
1,377.10
100.00%
100.00%
03.07.07.07
16.40
145.63
100.00%
100.00%
0.00
63,875.94
0.00
20,065.30
15.30
40.00%
60.00%
100.00%
03.08.00
03.08.01
0.00%
0.00%
03.08.01.01
M2
63.75
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
84.50
40.00%
60.00%
100.00%
03.08.01.03
M3
8.75
155.40
40.00%
60.00%
100.00%
03.08.01.04
M3
10.94
76.58
40.00%
60.00%
100.00%
03.08.01.05
M3
9.19
1,864.28
40.00%
60.00%
100.00%
03.08.01.06
M3
3.96
1,300.19
40.00%
60.00%
100.00%
03.08.01.07
M2
100.50
4,804.91
11
40.00%
60.00%
100.00%
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
1,110.12
40.00%
60.00%
100.00%
03.08.01.09
M2
81.00
702.27
40.00%
60.00%
100.00%
03.08.01.10
UND
25.00
9,951.75
40.00%
60.00%
100.00%
0.00
22,295.89
9.36
40.00%
60.00%
100.00%
03.08.02
0.00%
03.08.02.01
M2
39.00
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
42.51
40.00%
60.00%
100.00%
03.08.02.03
M3
6.83
121.30
40.00%
60.00%
100.00%
03.08.02.04
M3
8.53
59.71
40.00%
60.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
6
TOTAL %
03.08.02.05
M3
7.17
1,454.51
40.00%
60.00%
100.00%
03.08.02.06
M3
3.09
1,014.54
40.00%
60.00%
100.00%
03.08.02.07
M2
78.39
3,747.83
40.00%
60.00%
100.00%
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
1,731.82
40.00%
60.00%
100.00%
03.08.02.09
M2
63.18
547.77
40.00%
60.00%
100.00%
03.08.02.10
UND
39.00
13,566.54
40.00%
60.00%
100.00%
0.00
17,561.69
03.08.03
0.00%
03.08.03.01
M2
32.00
7.68
40.00%
60.00%
100.00%
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
34.88
40.00%
60.00%
100.00%
03.08.03.03
M3
5.60
99.46
40.00%
60.00%
100.00%
03.08.03.04
M3
7.00
49.00
40.00%
60.00%
100.00%
03.08.03.05
M3
5.88
1,192.82
40.00%
60.00%
100.00%
03.08.03.06
M3
2.53
830.67
40.00%
60.00%
100.00%
03.08.03.07
M2
64.32
3,075.14
40.00%
60.00%
100.00%
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
1,420.99
40.00%
60.00%
100.00%
03.08.03.09
M2
51.84
449.45
40.00%
60.00%
100.00%
03.08.03.10
UND
32.00
10,401.60
40.00%
60.00%
100.00%
0.00
3,953.06
03.08.04
0.00%
03.08.04.01
M2
33.00
7.92
40.00%
60.00%
100.00%
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
35.97
40.00%
60.00%
100.00%
03.08.04.03
M3
4.13
73.35
40.00%
60.00%
100.00%
03.08.04.04
M3
5.16
36.12
40.00%
60.00%
100.00%
03.08.04.05
M3
3.45
699.87
40.00%
60.00%
100.00%
03.08.04.06
M3
2.62
860.22
40.00%
60.00%
100.00%
03.08.04.07
M2
25.34
1,211.51
40.00%
60.00%
100.00%
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
478.40
40.00%
60.00%
100.00%
03.08.04.09
M2
16.37
549.70
40.00%
60.00%
100.00%
0.00
323,424.74
0.00
24,487.06
2,614.20
8,966.71
100.00%
04.00.00
04.01.00
0.00%
0.00%
04.01.01
M3
04.01.02
M3
15.84
74.45
100.00%
04.01.03
M2
3,645.00
3,316.95
60.00%
04.01.04
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
2,485.44
12,128.95
04.02.00
0.00
238,135.92
0.00
13,549.32
04.02.01
04.02.01.01
100.00%
100.00%
40.00%
100.00%
100.00%
100.00%
0.00%
0.00%
M3
660.96
5,664.43
60.00%
40.00%
100.00%
04.02.01.02
M3
660.96
1,295.48
60.00%
40.00%
100.00%
04.02.01.03
M3
660.96
2,174.56
60.00%
40.00%
100.00%
04.02.01.04
M2
3,672.00
3,929.04
60.00%
40.00%
100.00%
04.02.01.05
M3
55.08
485.81
60.00%
40.00%
100.00%
0.00
69,203.98
68,556.24
60.00%
40.00%
100.00%
60.00%
40.00%
100.00%
100.00%
04.02.02
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
M2
3,672.00
M3
73.44
647.74
0.00
153,980.21
0.00%
0.00%
M2
3,685.50
22,739.54
100.00%
04.02.03.02
M2
3,685.50
124,754.18
40.00%
60.00%
100.00%
04.02.03.03
M2
3,685.50
995.09
40.00%
60.00%
100.00%
04.02.03.04
M2
3,685.50
5,491.40
40.00%
60.00%
100.00%
0.00
1,402.41
1,390.50
100.00%
100.00%
100.00%
100.00%
04.02.04
04.02.04.01
04.02.04.02
M2
270.00
0.00%
M3
1.35
11.91
04.03.00
0.00
60,801.76
04.03.01
0.00
10,473.61
10.98
100.00%
100.00%
0.00%
0.00%
04.03.01.01
M2
45.76
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
97.49
100.00%
100.00%
04.03.01.03
M3
32.04
569.03
11
100.00%
100.00%
04.03.01.04
M2
9.24
7.21
100.00%
100.00%
04.03.01.05
M3
2.22
178.11
100.00%
100.00%
04.03.01.06
M3
24.52
543.61
100.00%
100.00%
04.03.01.07
M3
0.69
3.68
100.00%
100.00%
04.03.01.08
M3
14.84
103.88
100.00%
100.00%
04.03.01.09
8.19
2,774.44
100.00%
100.00%
04.03.01.10
M3
0.86
181.46
100.00%
100.00%
04.03.01.11
M3
3.46
701.90
100.00%
100.00%
04.03.01.12
M3
1.39
368.39
100.00%
100.00%
04.03.01.13
M3
4.17
1,330.94
100.00%
100.00%
04.03.01.14
M2
48.29
1,871.72
100.00%
100.00%
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
357.77
100.00%
100.00%
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
1,373.00
100.00%
100.00%
OBRA
UBICACIN
ITEM
DESCRIPCION DE PARTIDAS
DESFOGUE CUNETAS HACIA ALCANTARILLA RIB STEEL
UND
METRADO
PRECIO
PARCIAL
Duracin
(D=Tu/f) das
MES
MES
MES
MES
MES
MES
TOTAL %
0.00
826.18
6.23
100.00%
100.00%
0.00%
04.03.02.01
M2
25.94
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
55.02
100.00%
100.00%
04.03.02.03
M3
9.43
167.48
100.00%
100.00%
04.03.02.04
M3
11.79
82.53
100.00%
100.00%
04.03.02.05
M3
1.18
239.37
100.00%
100.00%
04.03.02.06
M3
0.88
233.23
100.00%
100.00%
04.03.02.07
M2
5.44
42.32
100.00%
100.00%
0.00
39,396.35
1,274.40
24
60.00%
40.00%
100.00%
04.03.03
0.00%
04.03.03.01
ML
1,080.00
04.03.03.02
ML
1,080.00
453.60
60.00%
40.00%
100.00%
04.03.03.03
ML
1,080.00
29,646.00
60.00%
40.00%
100.00%
04.03.03.04
M2
420.15
5,659.42
20
60.00%
40.00%
100.00%
04.03.03.05
421.20
2,362.93
60.00%
40.00%
100.00%
0.00
10,105.62
140.00
2,366.00
100.00%
100.00%
04.03.04
04.03.04.01
M2
0.00%
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
4,107.04
100.00%
100.00%
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
3,632.58
100.00%
100.00%
0.00
84,424.91
0.00
24,000.00
MES
6.00
24,000.00
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
05.02.00
PROGRAMA DE SEALIZACION
05.02.01
05.03.00
05.03.01
05.04.00
0.00
5,768.56
28.00
5,768.56
0.00
4,278.04
HA
0.95
4,278.04
0.00%
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00
46,878.31
05.04.01
KM
37.24
12,424.75
13
05.04.02
M2
3,000.00
3,420.00
50.00%
50.00%
100.00%
05.04.03
M3
80.00
2,418.40
20
50.00%
50.00%
100.00%
05.04.04
M2
6,650.00
6,849.50
100.00%
100.00%
05.04.05
M3
24,455.80
21,765.66
10
100.00%
100.00%
0.00
3,500.00
GLB
1.00
3,500.00
0.00
9,927.66
0.00
6,896.43
6,699.96
14
05.05.00
05.05.01
06.00.00
06.01.00
06.01.01
06.01.02
0
UND
0.00%
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
PRUEBAS, ENSAYOS Y CONTROL DE CALIDAD
PRUEBAS DE COMPACTACION EN SUB BASE Y BASE GRANULAR
PRUEBAS DE COMPACTACION EN SUB BASE
UND
111.00
UND
3.00
196.47
0.00
1,584.00
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
10.00%
20.00%
20.00%
60.00%
40.00%
20.00%
20.00%
10.00%
100.00%
100.00%
06.02.00
06.02.01
UND
5.00
803.60
40.00%
60.00%
100.00%
06.02.02
UND
5.00
453.60
40.00%
60.00%
100.00%
06.02.03
UND
5.00
326.80
40.00%
60.00%
100.00%
06.03.00
0.00
1,447.23
UND
30.00
1,207.20
20.00%
20.00%
06.03.01
06.03.02
UND
1.00
240.03
07.00.00
0.00
56,804.00
07.01.00
GLB
1.00
4,500.00
HA
0.56
52,304.00
0.00
990.80
UND
1.00
990.80
0.00
32,796.77
GLB
1.00
32,796.77
07.02.00
08.00.00
08.01.00
09.00.00
09.01.00
0.00%
0.00%
20.00%
20.00%
20.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
10.00%
100.00%
0.00%
20.00%
20.00%
20.00%
20.00%
10.00%
OBRA
UBICACIN
ITEM
PART
01.00.00
DESCRIPCION
OBRAS PROVISIONALES
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
1,276.19
1,701.59
1,701.59
650.00
750.00
301.58
0.00
0.00
12,422.78
01.01.00
UND
2.00
4,253.97
8,507.94
2,126.99
01.02.00
0.00
0.00
3,914.84
0.00
01.02.01
M2
15.30
0.24
3.67
01.02.02
TRAZO Y REPLANTEO
M2
6.00
4.36
01.02.03
M3
4.80
01.02.04
M3
01.02.05
01.02.06
0.00
0.00
0.00
3.67
0.00
0.00
0.00
26.16
0.00
26.16
0.00
0.00
0.00
17.76
85.25
0.00
85.25
0.00
0.00
0.00
6.00
7.00
42.00
0.00
42.00
0.00
0.00
0.00
M3
4.52
133.79
604.73
0.00
604.73
0.00
0.00
0.00
M3
0.45
215.83
97.12
0.00
97.12
0.00
0.00
0.00
01.02.07
M3
1.16
319.17
370.24
0.00
312.79
57.45
0.00
0.00
01.02.08
M2
12.85
26.59
341.68
0.00
341.68
0.00
0.00
0.00
01.02.09
M2
15.05
67.77
1,019.94
0.00
1,019.94
0.00
0.00
0.00
01.02.10
M2
41.60
18.30
761.28
0.00
0.00
761.28
0.00
0.00
01.02.11
M2
38.40
8.70
334.08
0.00
0.00
334.08
0.00
0.00
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
4.18
228.69
0.00
228.69
0.00
0.00
0.00
02.00.00
TRABAJOS PRELIMINARES
0.00
0.00
110,858.39
0.00
GLB
2.00
17,730.00
35,460.00
5,850.90
5,850.90
5,850.90
3,723.30
1,200.00
2,184.00
02.01.00
0.00
0.00
10,800.00
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
0.48
44,544.68
6,057.99
10,635.11
20,529.36
2,260.84
3,200.00
1,861.39
02.03.00
KM
37.24
473.49
17,632.77
2,381.65
4,053.07
7,788.91
1,190.83
950.00
850.00
418.31
02.04.00
KM
37.24
355.02
13,220.94
1,721.85
3,038.97
5,840.08
0.00
920.00
870.00
830.04
0.00
0.00
1,956,817.70
0.00
0.00
0.00
0.00
5,817.94
0.00
0.00
03.00.00
03.01.00
03.01.01
M3
738.00
6.70
4,944.60
03.01.02
M3
32.80
7.88
258.46
03.01.03
M3
126.00
4.88
0.00
03.02.00
MOVIMIENTO DE TIERRAS
984.90
1,849.20
1,440.50
39.40
219.06
0.00
0.00
614.88
73.20
0.00
541.68
0.00
0.00
187,878.69
0.00
13,558.65
03.02.01
M3
19,111.91
3.43
65,553.85
03.02.02
M3
87.70
14.56
1,276.91
03.02.03
M3
87.70
4.88
427.98
03.02.04
M3
1,638.50
4.70
7,700.95
03.02.05
M3
851.29
6.70
5,703.64
03.02.06
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
21,970.36
4.88
107,215.36
280.00
0.00
0.00
390.00
0.00
0.00
0.00
0.00
0.00
25,092.86
26,902.35
0.00
1,165.09
0.00
111.82
0.00
0.00
0.00
390.50
0.00
37.48
0.00
0.00
5,536.13
14,176.03
0.00
0.00
804.00
0.00
0.00
4,093.70
500.00
305.94
0.00
16,250.74
26,115.22
59,720.66
2,691.08
1,500.00
937.66
0.00
0.00
OBRA
UBICACIN
ITEM
PART
03.03.00
03.03.01
03.03.01.01
03.03.01.02
03.03.02
DESCRIPCION
PAVIMENTO Y TRATAMIENTO DE PLATAFORMA
PERFILADO Y COMPACTACION PLATAFORMA PREVIO AFIRMADO
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 2
MES 3
MES 4
MES 5
0.00
0.00
639,446.88
0.00
0.00
0.00
0.00
153,146.41
0.00
0.00
M2
130,381.78
0.91
118,647.42
M3
MES 1
3,911.45
8.82
34,498.99
0.00
0.00
1,050.13
0.00
MES 6
MES 7
0.00
0.00
36,419.36
50,820.68
11,256.70
2,800.00
9,500.00
7,850.68
10,589.63
14,777.09
3,273.10
950.00
2,950.00
1,959.17
0.00
0.00
03.03.02.01
M3
17.71
8.57
151.77
0.00
0.00
0.00
0.00
0.00
151.77
0.00
03.03.02.02
M3
17.71
1.96
34.71
0.00
0.00
0.00
0.00
0.00
34.71
0.00
03.03.02.03
M3
17.71
3.29
58.27
0.00
0.00
0.00
0.00
0.00
58.27
0.00
03.03.02.04
M2
604.48
1.20
725.38
0.00
0.00
0.00
0.00
0.00
725.38
0.00
03.03.02.05
M3
9.07
8.82
80.00
0.00
0.00
0.00
0.00
0.00
80.00
0.00
0.00
0.00
466,114.75
0.00
03.03.03
03.03.03.01
M3
22,737.92
8.57
194,863.97
03.03.03.02
M3
22,737.92
1.96
03.03.03.03
M3
22,737.92
3.29
03.03.03.04
M2
126,321.78
03.03.03.05
M3
03.03.04
03.03.04.01
0.00
0.00
4,274.97
0.00
23,007.88
55,860.37
55,860.37
55,860.37
44,566.32
977.71
0.00
5,262.01
12,775.53
12,775.53
12,775.53
74,807.76
1,641.15
0.00
8,832.66
21,444.65
21,444.65
21,444.65
1.07
135,164.30
2,965.26
0.00
15,959.05
38,746.66
38,746.66
38,746.66
1,894.83
8.82
16,712.40
366.64
0.00
748.82
5,198.98
5,198.98
5,198.98
0.00
0.00
19,135.59
0.00
4,175.31
4,175.31
0.00
0.00
M3
974.40
8.57
8,350.61
0.00
0.00
0.00
0.00
03.03.04.02
M3
974.40
1.96
1,909.82
0.00
0.00
0.00
0.00
954.91
954.91
03.03.04.03
M3
974.40
3.29
3,205.78
0.00
0.00
0.00
0.00
1,602.89
1,602.89
03.03.04.04
M2
4,060.00
1.22
4,953.20
0.00
0.00
0.00
0.00
2,476.60
2,476.60
03.03.04.05
M3
81.20
8.82
716.18
0.00
0.00
0.00
0.00
358.09
358.09
0.00
0.00
88,147.73
0.00
03.04.00
0.00
03.04.01
ML
41,279.22
1.18
48,709.48
14,224.49
5,315.14
03.04.02
ML
41,279.22
0.42
17,337.27
5,062.95
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
0.82
4,762.56
1,226.72
03.04.04
ML
400.00
27.45
10,980.00
0.00
03.04.05
M2
410.00
13.47
5,522.70
03.04.06
148.97
5.61
835.72
0.00
0.00
106,179.16
0.00
03.05.00
0.00
15,387.20
4,594.22
4,594.22
4,594.22
7,957.87
0.00
1,438.82
1,438.82
1,438.82
2,148.40
426.40
320.35
320.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
320.35
10,980.00
5,522.70
0.00
835.72
0.00
0.00
03.05.01
M2
507.70
0.24
121.85
0.00
0.00
0.00
0.00
60.93
60.93
03.05.02
TRAZO Y REPLANTEO
M2
749.62
4.36
3,268.34
0.00
0.00
0.00
0.00
1,634.17
1,634.17
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
03.05.03
M3
156.68
17.76
2,782.64
0.00
0.00
0.00
0.00
1,391.32
1,391.32
03.05.04
M2
348.89
0.79
275.62
0.00
0.00
0.00
0.00
137.81
137.81
03.05.05
M3
195.85
7.00
1,370.95
0.00
0.00
0.00
0.00
685.48
685.48
03.05.06
M3
173.59
312.29
54,210.42
0.00
0.00
0.00
0.00
27,105.21
27,105.21
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
30.65
31,232.35
0.00
0.00
0.00
0.00
15,616.18
15,616.17
03.05.08
346.00
5.61
1,941.06
0.00
0.00
0.00
0.00
970.53
970.53
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
4.18
10,975.93
0.00
0.00
0.00
0.00
5,487.97
5,487.97
0.00
0.00
759.00
508.53
03.06.00
03.06.01
03.06.02
0
ML
0
0.00
0.00
37,365.98
167.00
7.59
1,267.53
0.00
0.00
4,631.59
0.00
0.00
0.00
0.00
0.00
0.00
03.06.02.01
M2
284.00
0.24
68.16
0.00
0.00
31.68
36.48
0.00
03.06.02.02
M3
193.12
14.88
2,873.63
0.00
0.00
1,335.63
1,538.00
0.00
03.06.02.03
M3
241.40
7.00
1,689.80
0.00
0.00
785.40
904.40
0.00
03.06.03
0.00
0.00
195.04
0.00
0.00
0.00
03.06.03.01
M2
25.00
0.24
6.00
0.00
0.00
0.00
6.00
0.00
0.00
03.06.03.02
M3
8.00
14.88
119.04
0.00
0.00
0.00
119.04
0.00
0.00
03.06.03.03
M3
10.00
7.00
70.00
0.00
0.00
0.00
70.00
0.00
0.00
03.06.04
0.00
0.00
540.11
0.00
03.06.04.01
M2
35.00
0.24
8.40
03.06.04.02
M3
22.50
14.88
334.80
03.06.04.03
M3
28.13
7.00
196.91
0.00
0.00
6,521.22
03.06.05
03.06.05.01
M2
10.00
0.24
2.40
03.06.05.02
M3
13.60
14.88
202.37
03.06.05.03
M3
3.84
60.70
03.06.05.04
M3
21.80
7.00
03.06.05.05
M3
2.14
202.86
03.06.05.06
M3
1.89
03.06.05.07
M3
4.91
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
03.06.05.09
TARRAJEO Y ACABADOS
03.06.05.10
ACERO FY=4200KG/CM2
0.00
0.00
0.00
0.00
0.00
4.40
4.00
0.00
0.00
0.00
0.00
180.00
154.80
0.00
0.00
0.00
0.00
100.00
96.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.20
1.20
0.00
0.00
0.00
101.00
101.37
233.09
0.00
0.00
0.00
116.00
117.09
152.60
0.00
0.00
0.00
76.00
76.60
434.12
0.00
0.00
0.00
216.00
218.12
312.29
590.23
0.00
0.00
0.00
295.00
295.23
338.36
1,661.35
0.00
0.00
0.00
830.00
831.35
18.00
30.65
551.70
0.00
0.00
0.00
275.00
276.70
M2
9.00
18.84
169.56
0.00
0.00
0.00
85.00
84.56
Kg
603.78
4.18
2,523.80
0.00
0.00
0.00
1,260.00
1,263.80
OBRA
UBICACIN
ITEM
PART
03.06.06
DESCRIPCION
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
10.80
0.00
MES 6
0.00
0.00
15,755.17
0.00
03.06.06.01
M2
45.00
0.24
10.80
0.00
0.00
0.00
03.06.06.02
M3
25.50
14.88
379.44
0.00
0.00
0.00
379.44
0.00
03.06.06.03
M3
19.50
60.70
1,183.65
0.00
0.00
0.00
1,183.65
0.00
03.06.06.04
M3
54.00
7.00
378.00
0.00
0.00
0.00
378.00
0.00
03.06.06.05
M3
42.71
202.86
8,664.15
0.00
0.00
0.00
8,664.15
0.00
03.06.06.06
M3
15.75
319.17
5,026.93
0.00
0.00
0.00
5,026.93
0.00
03.06.06.07
20.00
5.61
112.20
0.00
0.00
0.00
112.20
0.00
0.00
0.00
8,455.32
0.00
0.00
0.00
0.00
0.00
13.98
573.83
03.06.07
UNID.
METRADO
MEDIDA
0.00
0.00
0.00
0.00
03.06.07.01
M2
58.25
0.24
13.98
03.06.07.02
M3
32.31
17.76
573.83
0.00
0.00
0.00
0.00
0.00
03.06.07.03
M3
40.38
7.00
282.66
0.00
0.00
0.00
0.00
0.00
282.66
03.06.07.04
M3
5.81
239.28
1,390.22
0.00
0.00
0.00
0.00
0.00
1,390.22
03.06.07.05
M3
1.82
351.71
640.11
0.00
0.00
0.00
0.00
0.00
640.11
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
30.65
997.04
0.00
0.00
0.00
0.00
0.00
997.04
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
4.18
1,705.02
0.00
0.00
0.00
0.00
0.00
1,705.02
03.06.07.08
59.60
47.86
2,852.46
0.00
0.00
0.00
0.00
0.00
2,852.46
03.07.00
0.00
0.00
828,105.38
0.00
0.00
03.07.01
0.00
0.00
146,404.78
0.00
0.00
0.24
223.56
0.00
0.00
6.26
0.00
0.00
03.07.01.01
M2
931.50
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
4.36
1,883.26
0.00
0.00
34.14
616.37
616.37
616.37
03.07.01.03
M3
392.69
17.76
6,974.17
0.00
0.00
69.26
2,301.64
2,301.64
2,301.63
03.07.01.04
M3
490.87
7.00
3,436.09
0.00
0.00
22.89
1,137.73
1,137.73
1,137.74
03.07.01.05
M3
217.83
22.17
4,829.29
0.00
0.00
57.86
1,590.48
1,590.48
1,590.47
03.07.01.06
M3
36.52
211.00
7,705.72
0.00
0.00
272.19
2,477.84
2,477.84
2,477.85
03.07.01.07
M3
32.62
202.86
6,617.29
0.00
0.00
213.00
2,134.76
2,134.76
2,134.76
03.07.01.08
M3
110.51
312.29
34,511.17
0.00
0.00
327.90
11,394.42
11,394.42
11,394.42
03.07.01.09
M3
31.47
338.36
10,648.19
0.00
0.00
223.32
3,474.96
3,474.96
3,474.96
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
30.65
32,463.56
0.00
0.00
799.97
10,554.53
10,554.53
10,554.53
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
18.84
5,483.76
0.00
0.00
24.30
1,819.82
1,819.82
1,819.82
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
4.18
31,628.72
0.00
0.00
436.14
10,397.53
10,397.53
10,397.52
0.00
0.00
330,263.11
03.07.02
0.00
72.43
MES 7
0.00
72.43
72.43
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
03.07.02.01
M2
1,277.50
0.24
306.60
12.26
0.00
42.92
49.06
67.45
67.45
67.45
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
4.36
3,075.98
123.04
0.00
430.64
492.16
676.72
676.72
676.72
03.07.02.03
M3
690.36
17.76
12,260.79
490.35
0.00
1,716.86
1,962.12
2,697.15
2,697.15
2,697.15
03.07.02.04
M3
862.95
7.00
6,040.65
241.64
0.00
845.74
966.56
1,328.90
1,328.90
1,328.90
03.07.02.05
M3
316.20
22.17
7,010.15
140.11
980.80
1,261.03
1,542.74
1,542.74
1,542.74
03.07.02.06
M3
83.21
211.00
17,557.31
350.26
2,451.82
3,152.34
3,867.63
3,867.63
3,867.63
03.07.02.07
M3
35.45
202.86
7,191.39
144.03
1,008.21
1,296.28
1,580.96
1,580.96
1,580.96
03.07.02.08
M3
288.41
312.29
90,067.56
1,801.91
12,613.39
16,217.22
19,811.68
19,811.68
19,811.68
03.07.02.09
M3
68.42
338.36
23,150.59
460.17
3,221.19
4,141.53
5,109.24
5,109.24
5,109.24
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
30.65
71,003.79
1,420.01
9,940.10
12,780.13
15,621.18
15,621.18
15,621.18
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
18.84
11,300.23
225.89
1,581.24
2,033.02
2,486.69
2,486.69
2,486.69
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
4.18
81,298.07
1,625.98
11,381.85
14,633.80
17,885.48
17,885.48
17,885.48
8.83
26.50
88.32
85.38
85.38
85.38
0.00
0.00
222,183.56
03.07.03.01
03.07.03
M2
1,582.40
0.24
379.78
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
4.36
3,192.78
74.29
222.88
742.94
717.55
717.55
717.55
03.07.03.03
M3
501.83
17.76
8,912.50
207.44
622.31
2,074.37
2,002.79
2,002.79
2,002.79
03.07.03.04
M3
627.29
7.00
4,391.03
102.06
306.18
1,020.60
987.40
987.40
987.40
03.07.03.05
M3
263.72
22.17
5,846.67
136.12
408.37
1,361.24
1,313.65
1,313.65
1,313.65
03.07.03.06
M3
10.16
211.00
2,143.76
50.64
151.92
506.40
478.27
478.27
478.27
03.07.03.07
M3
59.43
202.86
12,055.97
279.95
839.84
2,799.47
2,712.24
2,712.24
2,712.24
03.07.03.08
M3
168.68
312.29
52,677.08
1,224.18
3,672.53
12,241.77
11,846.20
11,846.20
11,846.20
03.07.03.09
M3
73.14
338.36
24,747.65
575.21
1,725.64
5,752.12
5,564.89
5,564.89
5,564.89
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
30.65
58,659.20
1,363.93
4,091.78
13,639.25
13,188.08
13,188.08
13,188.08
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
18.84
5,768.05
134.14
402.42
1,341.41
1,296.69
1,296.69
1,296.69
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
4.18
43,409.09
1,009.55
3,028.66
10,095.54
9,758.45
9,758.45
9,758.45
0.00
0.00
18,422.69
0.00
03.07.04
0.00
03.07.04.01
M2
89.10
0.24
21.38
10.69
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
4.36
177.89
03.07.04.03
M3
43.50
17.76
03.07.04.04
M3
54.38
03.07.04.05
M3
03.07.04.06
M3
0.00
0.00
0.00
0.00
0.00
10.69
0.00
0.00
88.94
0.00
88.94
0.00
0.00
772.56
386.28
0.00
386.28
0.00
0.00
7.00
380.66
190.33
0.00
190.33
0.00
0.00
26.00
22.17
576.42
0.00
288.21
288.21
0.00
0.00
3.84
211.00
810.24
0.00
405.12
405.12
0.00
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
03.07.04.07
M3
3.44
202.86
697.84
0.00
348.92
348.92
0.00
0.00
03.07.04.08
M3
12.58
312.29
3,928.61
0.00
1,964.30
1,964.30
0.00
0.00
03.07.04.09
M3
3.65
338.36
1,235.01
0.00
619.20
615.82
0.00
0.00
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
30.65
3,766.89
0.00
1,883.44
1,883.44
0.00
0.00
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
18.84
656.76
0.00
328.38
328.38
0.00
0.00
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
4.18
5,398.43
0.00
2,699.24
2,699.19
0.00
0.00
0.00
103,730.02
0.00
0.24
175.56
57.60
03.07.05
03.07.05.01
M2
731.50
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
4.36
2,126.07
03.07.05.03
M3
447.68
17.76
7,950.80
03.07.05.04
M3
537.22
7.00
3,760.54
0.00
03.07.05.05
M3
258.26
202.86
52,390.62
0.00
03.07.05.06
M3
76.97
319.17
24,566.51
0.00
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
30.65
12,111.96
0.00
03.07.05.08
115.50
5.61
647.96
0.00
12.00
0.00
1,046.40
0.00
176.58
0.00
480.00
423.09
0.00
2,498.83
829.39
0.00
2,622.58
2,000.00
1,576.68
394.80
0.00
890.00
899.06
18,977.55
6,197.37
0.00
14,500.00
12,715.69
9,255.93
2,872.53
0.00
6,800.00
5,638.05
1,869.65
887.32
0.00
4,750.00
4,604.99
0.00
0.00
0.00
322.00
325.96
0.00
0.00
2,875.19
0.00
03.07.06.01
M2
75.00
0.24
18.00
10.21
0.00
0.00
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
4.36
197.51
111.18
0.00
03.07.06.03
M3
8.33
17.76
147.94
147.94
03.07.06.04
M3
24.40
59.99
1,463.76
1,463.76
03.07.06.05
M3
47.27
22.17
1,047.98
0.00
0.00
4,226.03
0.00
6.40
03.07.07.01
M2
32.00
0.24
7.68
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
4.36
122.08
101.73
03.07.07.03
M3
4.88
17.76
86.67
03.07.07.04
M3
16.32
22.17
03.07.07.05
M3
12.78
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
03.07.07.07
03.08.00
03.08.01
03.08.01.01
55.96
0.00
0.00
03.07.06
03.07.07
0.00
0.00
50.00
0.00
0.00
7.79
0.00
0.00
0.00
86.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
487.74
0.00
560.24
0.00
0.00
0.00
0.00
0.00
1.28
0.00
0.00
0.00
20.36
0.00
0.00
86.67
0.00
0.00
0.00
0.00
361.81
0.00
0.00
361.81
0.00
0.00
166.28
2,125.06
0.00
2,125.06
0.00
0.00
0.00
44.93
30.65
1,377.10
0.00
1,377.10
0.00
0.00
0.00
16.40
8.88
145.63
0.00
0.00
145.63
0.00
0.00
0.00
63,875.94
0.00
0.00
0.00
0.00
20,065.30
0.00
0.00
M2
63.75
0.24
15.30
0.00
0.00
0.00
0.00
0.00
6.12
0.00
0.00
9.18
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
4.36
84.50
0.00
0.00
0.00
0.00
33.80
50.70
03.08.01.03
M3
8.75
17.76
155.40
0.00
0.00
0.00
0.00
62.16
93.24
03.08.01.04
M3
10.94
7.00
76.58
0.00
0.00
0.00
0.00
30.63
45.95
03.08.01.05
M3
9.19
202.86
1,864.28
0.00
0.00
0.00
0.00
745.71
1,118.57
03.08.01.06
M3
3.96
328.33
1,300.19
0.00
0.00
0.00
0.00
520.08
780.11
03.08.01.07
M2
100.50
47.81
4,804.91
0.00
0.00
0.00
0.00
1,921.96
2,882.95
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
4.18
1,110.12
0.00
0.00
0.00
0.00
444.05
666.07
03.08.01.09
M2
81.00
8.67
702.27
0.00
0.00
0.00
0.00
280.91
421.36
03.08.01.10
UND
25.00
398.07
9,951.75
0.00
0.00
0.00
0.00
3,980.70
5,971.05
0.00
0.00
22,295.89
0.00
03.08.02.01
03.08.02
M2
39.00
0.24
9.36
0.00
0.00
0.00
0.00
3.74
5.62
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
4.36
42.51
0.00
0.00
0.00
0.00
17.00
25.51
03.08.02.03
M3
6.83
17.76
121.30
0.00
0.00
0.00
0.00
48.52
72.78
03.08.02.04
M3
8.53
7.00
59.71
0.00
0.00
0.00
0.00
23.88
35.83
03.08.02.05
M3
7.17
202.86
1,454.51
0.00
0.00
0.00
0.00
581.80
872.71
03.08.02.06
M3
3.09
328.33
1,014.54
0.00
0.00
0.00
0.00
405.82
608.72
03.08.02.07
M2
78.39
47.81
3,747.83
0.00
0.00
0.00
0.00
1,499.13
2,248.70
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
4.18
1,731.82
0.00
0.00
0.00
0.00
692.73
1,039.09
03.08.02.09
M2
63.18
8.67
547.77
0.00
0.00
0.00
0.00
219.11
328.66
03.08.02.10
UND
39.00
347.86
13,566.54
0.00
0.00
0.00
0.00
5,426.62
8,139.92
03.08.03
0.00
0.00
0.00
17,561.69
0.00
03.08.03.01
M2
32.00
0.24
7.68
0.00
0.00
0.00
0.00
3.07
4.61
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
4.36
34.88
0.00
0.00
0.00
0.00
13.95
20.93
03.08.03.03
M3
5.60
17.76
99.46
0.00
0.00
0.00
0.00
39.78
59.68
03.08.03.04
M3
7.00
7.00
49.00
0.00
0.00
0.00
0.00
19.60
29.40
03.08.03.05
M3
5.88
202.86
1,192.82
0.00
0.00
0.00
0.00
477.13
715.69
03.08.03.06
M3
2.53
328.33
830.67
0.00
0.00
0.00
0.00
332.27
498.40
03.08.03.07
M2
64.32
47.81
3,075.14
0.00
0.00
0.00
0.00
1,230.06
1,845.08
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
4.18
1,420.99
0.00
0.00
0.00
0.00
568.40
852.59
03.08.03.09
M2
51.84
8.67
449.45
0.00
0.00
0.00
0.00
179.78
269.67
03.08.03.10
UND
32.00
325.05
10,401.60
0.00
0.00
0.00
0.00
4,160.64
6,240.96
0.00
0.00
3,953.06
0.00
03.08.04
0.00
0.00
0.00
MES 7
0.00
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
MES 7
03.08.04.01
M2
33.00
0.24
7.92
0.00
0.00
0.00
0.00
3.17
4.75
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
4.36
35.97
0.00
0.00
0.00
0.00
14.39
21.58
03.08.04.03
M3
4.13
17.76
73.35
0.00
0.00
0.00
0.00
29.34
44.01
03.08.04.04
M3
5.16
7.00
36.12
0.00
0.00
0.00
0.00
14.45
21.67
03.08.04.05
M3
3.45
202.86
699.87
0.00
0.00
0.00
0.00
233.29
233.29
233.29
03.08.04.06
M3
2.62
328.33
860.22
0.00
0.00
0.00
0.00
286.74
286.74
286.74
03.08.04.07
M2
25.34
47.81
1,211.51
0.00
0.00
0.00
0.00
403.84
403.84
403.84
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
4.18
478.40
0.00
0.00
0.00
0.00
159.47
159.47
159.47
03.08.04.09
M2
16.37
33.58
549.70
0.00
0.00
0.00
0.00
183.23
183.23
183.23
0.00
0.00
323,424.74
0.00
0.00
0.00
0.00
24,487.06
0.00
0.00
2,614.20
3.43
8,966.71
0.00
0.00
0.00
0.00
0.00
04.00.00
04.01.00
0.00
0.00
04.01.01
M3
04.01.02
M3
15.84
4.70
74.45
0.00
0.00
0.00
0.00
0.00
37.23
37.23
04.01.03
M2
3,645.00
0.91
3,316.95
0.00
0.00
0.00
0.00
0.00
1,658.48
1,658.48
04.01.04
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
2,485.44
4.88
12,128.95
0.00
0.00
0.00
0.00
0.00
6,064.48
6,064.48
0.00
0.00
238,135.92
0.00
0.00
0.00
0.00
13,549.32
0.00
0.00
04.02.00
04.02.01
04.02.01.01
4,483.36
4,483.35
0.00
0.00
M3
660.96
8.57
5,664.43
0.00
0.00
0.00
0.00
0.00
04.02.01.02
M3
660.96
1.96
1,295.48
0.00
0.00
0.00
0.00
0.00
647.74
647.74
04.02.01.03
M3
660.96
3.29
2,174.56
0.00
0.00
0.00
0.00
0.00
1,087.28
1,087.28
04.02.01.04
M2
3,672.00
1.07
3,929.04
0.00
0.00
0.00
0.00
0.00
1,964.52
1,964.52
04.02.01.05
M3
55.08
8.82
485.81
0.00
0.00
0.00
0.00
0.00
242.91
242.91
0.00
0.00
69,203.98
0.00
68,556.24
0.00
0.00
0.00
0.00
0.00
34,278.12
34,278.12
0.00
0.00
0.00
0.00
323.87
323.87
04.02.02
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
M2
3,672.00
18.67
M3
73.44
8.82
647.74
0.00
0.00
0.00
153,980.21
0.00
2,832.22
0.00
2,832.22
0.00
0.00
0.00
0.00
22,739.54
M2
3,685.50
6.17
22,739.54
0.00
0.00
0.00
0.00
04.02.03.02
M2
3,685.50
33.85
124,754.18
0.00
0.00
0.00
0.00
04.02.03.03
M2
3,685.50
0.27
995.09
0.00
0.00
0.00
0.00
995.09
04.02.03.04
M2
3,685.50
1.49
5,491.40
0.00
0.00
0.00
0.00
5,491.40
0.00
0.00
1,402.41
0.00
270.00
5.15
1,390.50
0.00
0.00
0.00
0.00
04.02.04
04.02.04.01
0
M2
124,754.18
0.00
1,402.41
1,390.50
OBRA
UBICACIN
ITEM
PART
04.02.04.02
DESCRIPCION
RIEGO RENDIMIENTO CISTERNA CAP=2,000 GLN
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
0.00
0.00
0.00
MES 5
M3
1.35
8.82
11.91
0.00
04.03.00
0.00
0.00
60,801.76
0.00
0.00
04.03.01
0.00
0.00
10,473.61
0.00
0.00
04.03.01.01
M2
45.76
0.24
10.98
0.00
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
4.36
97.49
04.03.01.03
M3
32.04
17.76
04.03.01.04
M2
9.24
04.03.01.05
M3
04.03.01.06
04.03.01.07
MES 6
MES 7
11.91
0.00
0.00
0.00
0.00
0.00
0.00
10.98
0.00
0.00
0.00
0.00
0.00
0.00
97.49
0.00
569.03
0.00
0.00
0.00
0.00
0.00
569.03
0.00
0.78
7.21
0.00
0.00
0.00
0.00
0.00
7.21
0.00
2.22
80.23
178.11
0.00
0.00
0.00
0.00
0.00
178.11
0.00
M3
24.52
22.17
543.61
0.00
0.00
0.00
0.00
0.00
543.61
0.00
M3
0.69
5.33
3.68
0.00
0.00
0.00
0.00
0.00
3.68
0.00
04.03.01.08
M3
14.84
7.00
103.88
0.00
0.00
0.00
0.00
0.00
103.88
0.00
04.03.01.09
8.19
338.76
2,774.44
0.00
0.00
0.00
0.00
0.00
2,774.44
0.00
04.03.01.10
M3
0.86
211.00
181.46
0.00
0.00
0.00
0.00
0.00
181.46
0.00
04.03.01.11
M3
3.46
202.86
701.90
0.00
0.00
0.00
0.00
0.00
701.90
0.00
04.03.01.12
M3
1.39
265.03
368.39
0.00
0.00
0.00
0.00
0.00
368.39
0.00
04.03.01.13
M3
4.17
319.17
1,330.94
0.00
0.00
0.00
0.00
0.00
1,330.94
0.00
04.03.01.14
M2
48.29
38.76
1,871.72
0.00
0.00
0.00
0.00
0.00
1,871.72
0.00
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
18.84
357.77
0.00
0.00
0.00
0.00
0.00
357.77
0.00
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
4.18
1,373.00
0.00
0.00
0.00
0.00
0.00
1,373.00
0.00
0.00
0.00
826.18
0.00
04.03.02
0.00
0.00
04.03.02.01
M2
25.94
0.24
6.23
0.00
0.00
0.00
0.00
6.23
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
4.36
55.02
0.00
0.00
0.00
0.00
55.02
04.03.02.03
M3
9.43
17.76
167.48
0.00
0.00
0.00
0.00
167.48
04.03.02.04
M3
11.79
7.00
82.53
0.00
0.00
0.00
0.00
82.53
04.03.02.05
M3
1.18
202.86
239.37
0.00
0.00
0.00
0.00
239.37
04.03.02.06
M3
0.88
265.03
233.23
0.00
0.00
0.00
0.00
233.23
04.03.02.07
M2
5.44
7.78
42.32
0.00
0.00
0.00
0.00
0.00
0.00
39,396.35
0.00
1.18
1,274.40
0.00
0.00
0.00
0.00
04.03.03
42.32
0.00
0.00
04.03.03.01
ML
1,080.00
509.76
764.64
04.03.03.02
ML
1,080.00
0.42
453.60
0.00
0.00
0.00
0.00
181.44
272.16
04.03.03.03
ML
1,080.00
27.45
29,646.00
0.00
0.00
0.00
0.00
11,858.40
17,787.60
04.03.03.04
M2
420.15
13.47
5,659.42
0.00
0.00
0.00
0.00
2,263.77
3,395.65
OBRA
UBICACIN
ITEM
PART
04.03.03.05
04.03.04
04.03.04.01
DESCRIPCION
JUNTA ASFALTICA E=1"
SEALES COMPLEMENTARIA TRAMO ASFALTADO
PINTURA EN PAVIMENTO
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
MES 1
MES 2
MES 3
MES 4
0.00
0.00
0.00
421.20
5.61
2,362.93
0.00
0.00
0.00
10,105.62
0.00
140.00
16.90
2,366.00
0.00
0.00
0.00
0.00
0.00
M2
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
73.34
4,107.04
0.00
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
9.61
3,632.58
0.00
0.00
0.00
84,424.91
0.00
0.00
0.00
24,000.00
0.00
MES
6.00
4,000.00
24,000.00
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
05.02.00
PROGRAMA DE SEALIZACION
05.02.01
05.03.00
05.03.01
05.04.00
0.00
0.00
5,768.56
UND
28.00
206.02
5,768.56
MES 5
MES 6
MES 7
945.17
1,417.76
0.00
0.00
0.00
0.00
2,366.00
0.00
0.00
0.00
4,107.04
0.00
0.00
0.00
3,632.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,708.36
0.00
0.00
4,278.04
0.00
0.00
12,000.00
12,000.00
686.73
686.74
0.00
0.00
0.00
4,278.04
0.00
HA
0.95
4,503.20
4,278.04
0.00
0.00
0.00
46,878.31
0.00
333.64
12,424.75
0.00
0.00
0.00
0.00
686.73
0.00
0.00
0.00
0.00
0.00
0.00
12,424.75
05.04.01
KM
37.24
05.04.02
M2
3,000.00
1.14
3,420.00
0.00
0.00
0.00
1,368.00
0.00
1,026.00
05.04.03
M3
80.00
30.23
2,418.40
0.00
0.00
0.00
906.90
503.83
503.83
503.84
05.04.04
M2
6,650.00
1.03
6,849.50
0.00
0.00
0.00
2,060.00
1,596.50
1,596.50
1,596.50
05.04.05
M3
24,455.80
0.89
21,765.66
0.00
0.00
0.00
13,350.00
2,805.22
2,805.22
2,805.22
0.00
0.00
3,500.00
0.00
GLB
1.00
3,500.00
3,500.00
500.00
550.00
0.00
0.00
9,927.66
0.00
0.00
0.00
0.00
6,896.43
0.00
0.00
6,699.96
05.05.00
05.05.01
06.00.00
06.01.00
06.01.01
06.01.02
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
PRUEBAS, ENSAYOS Y CONTROL DE CALIDAD
PRUEBAS DE COMPACTACION EN SUB BASE Y BASE GRANULAR
UND
111.00
60.36
UND
3.00
65.49
196.47
0.00
0.00
0.00
1,584.00
0.00
5.00
160.72
803.60
0.00
06.02.01
UND
UND
UND
06.02.02
06.02.03
06.03.00
0.00
06.02.00
0.00
0.00
2,450.00
1,026.00
0.00
0.00
0.00
0.00
603.60
1,810.80
1,428.52
1,428.52
1,428.52
0.00
0.00
0.00
65.49
65.49
65.49
0.00
0.00
0.00
0.00
401.80
401.80
0.00
0.00
226.80
226.80
0.00
0.00
163.40
163.40
0.00
5.00
90.72
453.60
0.00
0.00
5.00
65.36
326.80
0.00
0.00
0.00
0.00
1,447.23
0.00
0.00
0.00
OBRA
UBICACIN
ITEM
PART
DESCRIPCION
UNID.
METRADO
MEDIDA
PRECIO
UNITARIO
PARCIAL
06.03.01
UND
30.00
40.24
1,207.20
06.03.02
UND
1.00
240.03
240.03
MES 1
MES 2
MES 3
MES 4
0.00
0.00
603.60
0.00
0.00
07.00.00
0.00
0.00
56,804.00
0.00
07.01.00
GLB
1.00
4,500.00
4,500.00
0.00
HA
0.56
93,400.00
52,304.00
0.00
0.00
990.80
0.00
UND
1.00
990.80
990.80
0.00
0.00
0.00
32,796.77
0.00
GLB
1.00
32,796.77
32,796.77
2,588,467.75
07.02.00
08.00.00
08.01.00
09.00.00
09.01.00
MES 5
MES 6
MES 7
402.40
70.07
70.07
61.06
0.00
240.03
0.00
0.00
0.00
0.00
3,150.00
0.00
0.00
0.00
450.00
0.00
450.00
450.00
26,152.00
26,152.00
0.00
0.00
990.80
0.00
0.00
0.00
0.00
8,199.19
0.00
3,279.68
8,199.19
4,372.90
4,372.90
4,372.91
67,176.13
228,786.86
302,574.32
276,643.17
392,150.80
606,001.83
728,548.32
2.60%
8.84%
11.69%
10.69%
15.15%
23.41%
28.15%
0.00
0.00
TOTAL
0.00
8,507.94
0.00
3.67
26.16
85.25
42.00
604.73
97.12
370.24
341.68
1,019.94
761.28
334.08
228.69
0.00
35,460.00
44,544.68
17,632.77
13,220.94
0.00
0.00
4,944.60
258.46
614.88
0.00
65,553.86
1,276.91
427.98
19,712.16
5,703.64
107,215.36
TOTAL
0.00
0.00
118,647.42
34,498.99
0.00
151.77
34.71
58.27
725.38
80.00
0.00
194,863.97
44,566.32
74,807.76
135,164.30
16,712.40
0.00
8,350.61
1,909.82
3,205.78
4,953.20
716.18
0.00
48,709.48
17,337.27
4,762.56
10,980.00
5,522.70
835.72
0.00
121.86
3,268.34
TOTAL
2,782.64
275.62
1,370.96
54,210.42
31,232.35
1,941.06
10,975.94
0.00
1,267.53
0.00
68.16
2,873.63
1,689.80
0.00
6.00
119.04
70.00
0.00
8.40
334.80
196.91
0.00
2.40
202.37
233.09
152.60
434.12
590.23
1,661.35
551.70
169.56
2,523.80
TOTAL
0.00
10.80
379.44
1,183.65
378.00
8,664.15
5,026.93
112.20
0.00
13.98
573.83
282.66
1,390.22
640.11
997.04
1,705.02
2,852.46
0.00
0.00
223.56
1,883.25
6,974.17
3,436.09
4,829.29
7,705.72
6,617.29
34,511.17
10,648.19
32,463.56
5,483.76
31,628.72
0.00
TOTAL
306.59
3,075.98
12,260.79
6,040.65
7,010.15
17,557.31
7,191.39
90,067.56
23,150.59
71,003.79
11,300.23
81,298.07
0.00
379.78
3,192.78
8,912.50
4,391.03
5,846.67
2,143.76
12,055.97
52,677.08
24,747.65
58,659.20
5,768.05
43,409.09
0.00
21.38
177.88
772.56
380.66
576.42
810.24
TOTAL
697.84
3,928.61
1,235.01
3,766.89
656.76
5,398.43
0.00
175.56
2,126.07
7,950.80
3,760.54
52,390.62
24,566.51
12,111.96
647.96
0.00
18.00
197.51
147.94
1,463.76
1,047.98
0.00
7.68
122.09
86.67
361.81
2,125.06
1,377.10
145.63
0.00
0.00
15.30
TOTAL
84.50
155.40
76.58
1,864.28
1,300.19
4,804.91
1,110.12
702.27
9,951.75
0.00
9.36
42.51
121.30
59.71
1,454.51
1,014.54
3,747.83
1,731.82
547.77
13,566.54
0.00
7.68
34.88
99.46
49.00
1,192.82
830.67
3,075.14
1,420.99
449.45
10,401.60
0.00
TOTAL
7.92
35.97
73.35
36.12
699.87
860.22
1,211.51
478.40
549.70
0.00
0.00
8,966.71
74.46
3,316.96
12,128.96
0.00
0.00
5,664.44
1,295.48
2,174.56
3,929.04
485.82
0.00
68,556.24
647.74
0.00
22,739.54
124,754.18
995.09
5,491.40
1,402.41
1,390.50
TOTAL
11.91
0.00
0.00
10.98
97.49
569.03
7.21
178.11
543.61
3.68
103.88
2,774.44
181.46
701.90
368.39
1,330.94
1,871.72
357.77
1,373.00
0.00
6.23
55.02
167.48
82.53
239.37
233.23
42.32
0.00
1,274.40
453.60
29,646.00
5,659.42
TOTAL
2,362.93
0.00
2,366.00
4,107.04
3,632.58
0.00
0.00
24,000.00
0.00
5,768.56
0.00
4,278.04
0.00
12,424.75
3,420.00
2,418.40
6,849.50
21,765.66
0.00
3,500.00
0.00
0.00
6,699.96
196.47
0.00
803.60
453.60
326.80
0.00
TOTAL
1,207.20
240.03
0.00
4,500.00
52,304.00
0.00
990.80
0.00
32,796.77
2,601,881.43
100.52%
PRESUPUESTO
Partida
01.01.00
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
8/6/2010
EQ. 0.50
Unidad
4,253.97
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
16.0000
9.21
147.36
147010003
OFICIAL
hh
2.00
32.0000
7.64
244.48
147010004
PEON
hh
5.00
80.0000
5.42
433.60
825.44
Materiales
202010061
Kg
7.2000
4.50
32.40
202040009
Kg
6.0000
4.50
27.00
202040010
ALAMBRE NEGRO N8
Kg
4.0000
4.50
18.00
202130021
Kg
8.0000
6.50
52.00
205000004
M3
2.1000
70.00
147.00
205000033
M3
1.9000
35.00
66.50
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
2.5000
22.00
55.00
239050000
AGUA
M3
0.3000
8.86
2.66
243600037
UND
6.0000
30.00
180.00
244010019
p2
210.0000
1.90
399.00
259010059
pln
165.0000
13.00
2,145.00
3,152.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
825.44
41.27
348110004
VOLQUETE DE 10 M3
hm
0.04
0.6400
130.00
83.20
349030013
hm
0.03
0.4000
150.00
60.00
349040033
hm
0.03
0.4000
230.00
92.00
276.47
Partida
01.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
01.02.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
01.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
01.02.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
01.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 20.00
Unidad
133.79
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
3.68
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4000
9.21
147010003
OFICIAL
hh
3.00
1.2000
7.64
9.17
147010004
PEON
hh
6.00
2.4000
5.42
13.01
25.86
Materiales
205000004
M3
0.2500
70.00
17.50
205000033
M3
0.6500
35.00
22.75
205010004
ARENA GRUESA
M3
0.2500
55.00
13.75
221000000
BOL
2.2500
22.00
49.50
239050000
AGUA
M3
0.1000
8.86
0.89
104.39
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.50
5.0000
25.86
1.29
0.2000
11.25
2.25
3.54
Partida
01.02.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
215.83
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5000
9.21
4.61
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
32.33
Materiales
205000004
M3
0.4050
70.00
205000033
M3
0.3250
35.00
28.35
11.38
205010004
ARENA GRUESA
M3
0.3825
55.00
21.04
221000000
BOL
5.2575
22.00
115.67
239050000
AGUA
M3
0.1380
8.86
1.22
177.66
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.75
5.0000
32.33
1.62
0.3750
11.25
4.22
5.84
Partida
01.02.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 14.00
Unidad
319.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.1429
9.21
10.53
147010003
OFICIAL
hh
3.00
1.7143
7.64
13.10
147010004
PEON
hh
6.00
3.4286
5.42
18.58
42.21
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
42.21
2.11
349100011
hm
1.00
0.5714
11.25
6.43
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5714
7.50
4.29
12.83
Partida
01.02.08
Rendimiento
M2/DIA
EQ. 12.00
26.59
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.6667
9.21
6.14
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
0.20
0.1333
5.42
0.72
11.95
Materiales
202010061
Kg
0.1500
4.50
0.68
202040009
Kg
0.0600
4.50
0.27
202040010
ALAMBRE NEGRO N8
Kg
0.1200
4.50
0.54
230200000
gln
0.0300
21.80
0.65
243010003
MADERA TORNILLO
p2
3.5000
3.40
11.90
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
11.95
0.60
0.60
Partida
01.02.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
67.77
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
11.34
Mano de Obra
147010002
OPERARIO
hh
1.00
1.2308
9.21
147010004
PEON
hh
1.20
1.4769
5.42
8.00
19.34
Materiales
202010061
Kg
0.0300
4.50
205010004
ARENA GRUESA
M3
0.0650
55.00
0.14
3.58
217000021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
65.0000
0.50
32.50
221000000
BOL
0.4200
22.00
9.24
239050000
AGUA
M3
0.0150
8.86
0.13
243010003
MADERA TORNILLO
p2
0.5500
3.40
1.87
47.46
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
19.34
0.97
0.97
Partida
01.02.10
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
18.30
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.6667
9.21
6.14
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
0.20
0.1333
5.42
0.72
11.95
Materiales
202010061
Kg
0.0300
4.50
0.14
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.5500
3.40
1.87
5.75
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
11.95
0.60
0.60
Partida
01.02.11
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
8.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5000
9.21
4.61
147010003
OFICIAL
hh
0.50
0.2500
7.64
1.91
6.52
Materiales
230990019
LIJA
UND
0.2000
2.00
0.40
253030027
THINER
gln
0.0120
16.00
0.19
254110011
PINTURA ESMALTE
gln
0.0420
30.00
1.26
1.85
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.52
0.33
0.33
Partida
01.02.12
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
Cantidad
4.18
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
02.01.00
Rendimiento
GLB/DIA
Cdigo
Descripcin Recurso
EQ. 1.00
Unidad
17,730.00
Cantidad
Precio S/.
Parcial S/.
1.0000
17,730.00
17,730.00
Materiales
232970002
MOVILIZACION Y DESMOVILIZACION
GLB
17,730.00
Partida
02.02.00
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
LIMPIEZA Y DEFORESTACION
870.00
EQ. 870.00
Unidad
0.48
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0018
9.21
0.02
147010004
PEON
hh
4.00
0.0368
5.42
0.20
0.22
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.30
5.0000
0.22
0.01
0.0028
90.00
0.25
0.26
Partida
02.03.00
Rendimiento
KM/DIA
Cdigo
Descripcin Recurso
EQ. 1.70
Unidad
473.49
Cantidad
Precio S/.
Parcial S/.
98.92
Mano de Obra
147000032
TOPOGRAFO
hh
2.00
9.4118
10.51
147010003
OFICIAL
hh
1.00
4.7059
7.64
35.95
147010004
PEON
hh
8.00
37.6471
5.42
204.05
338.92
Materiales
203030048
Kg
9.0000
3.10
221020007
UND
0.0020
80.00
27.90
0.16
243510062
ESTACA DE MADERA
UND
55.0000
0.50
27.50
254110011
PINTURA ESMALTE
gln
0.5000
30.00
15.00
70.56
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
338.92
16.95
349190005
TEODOLITO Y MIRAS
hm
1.00
4.7059
6.25
29.41
349890001
NIVEL TOPOGRAFICO
hm
1.00
4.7059
3.75
17.65
64.01
Partida
02.04.00
Rendimiento
KM/DIA
Cdigo
Descripcin Recurso
EQ. 0.75
Unidad
355.02
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
10.6667
10.51
112.11
147010003
OFICIAL
hh
2.00
21.3333
7.64
162.99
275.10
Materiales
221020007
UND
0.0020
80.00
0.16
229030002
BOL
3.0000
5.00
15.00
243510062
ESTACA DE MADERA
UND
10.0000
0.50
5.00
254110011
PINTURA ESMALTE
gln
0.2000
30.00
6.00
26.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349890001
NIVEL TOPOGRAFICO
hm
1.00
5.0000
275.10
13.76
10.6667
3.75
40.00
53.76
Partida
03.01.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 1,030.00
Unidad
Cantidad
6.70
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0078
9.21
0.07
147010004
PEON
hh
6.00
0.0466
5.42
0.25
0.32
Materiales
239050000
AGUA
M3
0.1000
8.86
0.89
0.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.32
0.02
349030013
hm
1.00
0.0078
150.00
1.17
349040009
hm
1.35
0.0105
190.00
2.00
349040033
hm
0.50
0.0039
230.00
0.90
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0078
180.00
1.40
5.49
Partida
03.01.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 150.00
Unidad
7.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0107
9.21
0.10
147010004
PEON
hh
6.00
0.3200
5.42
1.73
1.83
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
0.40
5.0000
1.83
0.09
0.0213
280.00
5.96
6.05
Partida
03.01.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 400.00
Unidad
4.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0100
7.64
0.08
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.08
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0200
130.00
2.60
349040009
hm
0.58
0.0116
190.00
2.20
4.80
Partida
03.02.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 690.00
Unidad
3.43
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0023
9.21
0.02
147010003
OFICIAL
hh
0.20
0.0023
7.64
0.02
147010004
PEON
hh
2.00
0.0232
5.42
0.13
0.17
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0116
280.00
3.25
3.26
Partida
03.02.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 250.00
Unidad
14.56
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0064
9.21
0.06
147010004
PEON
hh
2.00
0.0640
5.42
0.35
147010025
PERFORISTA OFICIAL
hh
2.00
0.0640
7.64
0.49
0.90
Materiales
227000010
MECHA LENTA
0.2000
1.10
0.22
227010000
CORDON DETONANTE 3P
0.9000
1.00
0.90
227020011
FULMINANTE
UND
0.5000
1.50
0.75
228000022
DINAMITA
Kg
0.0500
16.50
0.83
228010005
ANFO
Kg
0.1500
8.20
1.23
230020098
JGO
0.0020
1,480.00
2.96
6.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.90
0.05
349020011
hm
1.00
0.0320
150.00
4.80
349060006
hm
2.00
0.0640
30.00
1.92
6.77
Partida
03.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
500.00
EQ. 500.00
Unidad
4.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0032
9.21
0.03
147010004
PEON
hh
4.00
0.0640
5.42
0.35
0.38
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.38
0.02
0.0160
280.00
4.48
4.50
Partida
03.02.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 1,030.00
Unidad
4.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0078
9.21
0.07
147010004
PEON
hh
6.00
0.0466
5.42
0.25
0.32
Materiales
239050000
AGUA
M3
0.1000
8.86
0.89
0.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.32
0.02
349030013
hm
1.00
0.0078
150.00
1.17
349040033
hm
0.50
0.0039
230.00
0.90
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0078
180.00
1.40
3.49
Partida
03.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 1,030.00
Unidad
6.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0078
9.21
0.07
147010004
PEON
hh
6.00
0.0466
5.42
0.25
0.32
Materiales
239050000
AGUA
M3
0.1000
8.86
0.89
0.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.32
0.02
349030013
hm
1.00
0.0078
150.00
1.17
349040009
hm
1.35
0.0105
190.00
2.00
349040033
hm
0.50
0.0039
230.00
0.90
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0078
180.00
1.40
5.49
Partida
03.02.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
400.00
EQ. 400.00
Unidad
4.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0100
7.64
0.08
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.08
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0200
130.00
2.60
349040009
hm
0.58
0.0116
190.00
2.20
4.80
Partida
03.03.01.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 3,150.00
Unidad
0.91
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0025
9.21
0.02
147010004
PEON
hh
4.00
0.0102
5.42
0.06
0.08
Equipos
349030013
hm
1.00
0.0025
150.00
0.38
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0025
180.00
0.45
0.83
Partida
03.03.01.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
Cantidad
8.82
Precio S/.
Parcial S/.
Mano de Obra
147010004
PEON
hh
1.00
0.0879
5.42
0.48
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
03.03.02.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 575.00
Unidad
8.57
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010004
PEON
hh
2.00
0.0278
5.42
0.15
147010023
CONTROLADOR OFICIAL
hh
0.20
0.0028
7.64
0.02
0.17
Materiales
239020100
M3
1.0000
4.50
4.50
4.50
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0139
280.00
3.89
3.90
Partida
03.03.02.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 792.00
Unidad
1.96
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0051
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
349040009
hm
1.00
0.0101
190.00
1.92
1.92
Partida
03.03.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 320.00
Unidad
3.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.20
0.0050
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0250
130.00
3.25
3.25
Partida
03.03.02.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,400.00
Unidad
1.20
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0033
9.21
0.03
147010004
PEON
hh
4.00
0.0133
5.42
0.07
0.10
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.10
0.01
349030013
hm
1.00
0.0033
150.00
0.50
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0033
180.00
0.59
1.10
Partida
03.03.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
03.03.03.01
Rendimiento
M3/DIA
EQ. 575.00
8.57
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010004
PEON
hh
2.00
0.0278
5.42
0.15
147010023
CONTROLADOR OFICIAL
hh
0.20
0.0028
7.64
0.02
0.17
Materiales
239020100
M3
1.0000
4.50
4.50
4.50
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0139
280.00
3.89
3.90
Partida
03.03.03.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 792.00
Unidad
1.96
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0051
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
349040009
hm
1.00
0.0101
190.00
1.92
1.92
Partida
03.03.03.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 320.00
Unidad
3.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.20
0.0050
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0250
130.00
3.25
3.25
Partida
03.03.03.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,820.00
Unidad
1.07
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0028
9.21
0.03
147010004
PEON
hh
6.00
0.0170
5.42
0.09
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0028
7.64
0.02
0.14
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.14
0.01
349030013
hm
1.00
0.0028
150.00
0.42
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0028
180.00
0.50
0.93
Partida
03.03.03.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
03.03.04.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 575.00
Unidad
8.57
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010004
PEON
hh
2.00
0.0278
5.42
0.15
147010023
CONTROLADOR OFICIAL
hh
0.20
0.0028
7.64
0.02
0.17
Materiales
239020100
M3
1.0000
4.50
4.50
4.50
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0139
280.00
3.89
3.90
Partida
03.03.04.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 792.00
Unidad
1.96
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0051
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
349040009
hm
1.00
0.0101
190.00
1.92
1.92
Partida
03.03.04.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 320.00
Unidad
3.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.20
0.0050
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0250
130.00
3.25
3.25
Partida
03.03.04.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,500.00
Unidad
1.22
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0032
9.21
0.03
147010004
PEON
hh
6.00
0.0192
5.42
0.10
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0032
7.64
0.02
0.15
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.15
0.01
349030013
hm
1.00
0.0032
150.00
0.48
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0032
180.00
0.58
1.07
Partida
03.03.04.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
03.04.01
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 45.00
Unidad
1.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0178
9.21
0.16
147010004
PEON
hh
1.00
0.1778
5.42
0.96
1.12
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.12
0.06
0.06
Partida
03.04.02
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 600.00
Unidad
0.42
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0013
9.21
0.01
147010003
OFICIAL
hh
1.00
0.0133
7.64
0.10
147010004
PEON
hh
4.00
0.0533
5.42
0.29
0.40
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.40
0.02
0.02
Partida
03.04.03
LIMPIEZA DE CUNETAS
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
65.00
EQ. 65.00
Unidad
0.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0123
9.21
0.11
147010004
PEON
hh
1.00
0.1231
5.42
0.67
0.78
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.78
0.04
0.04
Partida
03.04.04
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 170.00
Unidad
27.45
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
0.0941
9.21
0.87
147010003
OFICIAL
hh
3.00
0.1412
7.64
1.08
147010004
PEON
hh
6.00
0.2824
5.42
1.53
3.48
Materiales
205000004
M3
0.0570
70.00
205010004
ARENA GRUESA
M3
0.0535
55.00
3.99
2.94
221000000
BOL
0.7350
22.00
16.17
239050000
AGUA
M3
0.0193
8.86
0.17
23.27
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
1.00
5.0000
3.48
0.17
0.0471
11.25
0.53
0.70
Partida
03.04.05
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 22.00
Unidad
13.47
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.3636
9.21
3.35
147010003
OFICIAL
hh
1.00
0.3636
7.64
2.78
147010004
PEON
hh
1.00
0.3636
5.42
1.97
8.10
Materiales
202010061
Kg
0.0500
4.50
0.23
202040009
Kg
0.0200
4.50
0.09
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
1.3000
3.40
4.42
4.96
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
8.10
0.41
0.41
Partida
03.04.06
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 80.00
Unidad
5.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0200
9.21
0.18
147010003
OFICIAL
hh
1.00
0.1000
7.64
0.76
147010004
PEON
hh
1.00
0.1000
5.42
0.54
1.48
Materiales
204000000
ARENA FINA
M3
0.0300
60.00
1.80
213000006
ASFALTO RC-250
gln
0.1500
14.50
2.18
243570051
LEA
CGA
0.0100
8.00
0.08
4.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.48
0.07
0.07
Partida
03.05.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.05.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.05.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.05.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 320.00
Unidad
0.79
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0025
9.21
0.02
147010003
OFICIAL
hh
1.00
0.0250
7.64
0.19
147010004
PEON
hh
4.00
0.1000
5.42
0.54
0.75
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.75
0.04
0.04
Partida
03.05.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.05.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.05.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.05.08
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 80.00
Unidad
5.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0200
9.21
0.18
147010003
OFICIAL
hh
1.00
0.1000
7.64
0.76
147010004
PEON
hh
1.00
0.1000
5.42
0.54
1.48
Materiales
204000000
ARENA FINA
M3
0.0300
60.00
1.80
213000006
ASFALTO RC-250
gln
0.1500
14.50
2.18
243570051
LEA
CGA
0.0100
8.00
0.08
4.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.48
0.07
0.07
Partida
03.05.09
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.06.01
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 25.00
Unidad
7.59
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0320
9.21
0.29
147010004
PEON
hh
4.00
1.2800
5.42
6.94
7.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
7.23
0.36
0.36
Partida
03.06.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.02.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
14.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
2.6667
5.42
14.45
Mano de Obra
147010004
PEON
hh
14.45
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
14.45
0.43
0.43
Partida
03.06.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.03.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.03.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
14.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
2.6667
5.42
14.45
Mano de Obra
147010004
PEON
hh
14.45
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
14.45
0.43
0.43
Partida
03.06.03.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.04.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.04.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
14.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
2.6667
5.42
14.45
Mano de Obra
147010004
PEON
hh
14.45
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
14.45
0.43
0.43
Partida
03.06.04.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.05.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.05.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
14.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
2.6667
5.42
14.45
Mano de Obra
147010004
PEON
hh
14.45
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
14.45
0.43
0.43
Partida
03.06.05.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 0.75
Unidad
60.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
10.6667
5.42
57.81
Mano de Obra
147010004
PEON
hh
57.81
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
57.81
2.89
2.89
Partida
03.06.05.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.05.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.06.05.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.06.05.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
338.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.06.05.08
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.06.05.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
Unidad
18.84
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
03.06.05.10
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.06.06.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.06.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
14.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
2.6667
5.42
14.45
Mano de Obra
147010004
PEON
hh
14.45
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
14.45
0.43
0.43
Partida
03.06.06.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 0.75
Unidad
60.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
10.6667
5.42
57.81
Mano de Obra
147010004
PEON
hh
57.81
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
57.81
2.89
2.89
Partida
03.06.06.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.06.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.06.06.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 14.00
Unidad
319.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.1429
9.21
10.53
147010003
OFICIAL
hh
3.00
1.7143
7.64
13.10
147010004
PEON
hh
6.00
3.4286
5.42
18.58
42.21
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
42.21
2.11
349100011
hm
1.00
0.5714
11.25
6.43
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5714
7.50
4.29
12.83
Partida
03.06.06.07
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 80.00
Unidad
5.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0200
9.21
0.18
147010003
OFICIAL
hh
1.00
0.1000
7.64
0.76
147010004
PEON
hh
1.00
0.1000
5.42
0.54
1.48
Materiales
204000000
ARENA FINA
M3
0.0300
60.00
1.80
213000006
ASFALTO RC-250
gln
0.1500
14.50
2.18
243570051
LEA
CGA
0.0100
8.00
0.08
4.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.48
0.07
0.07
Partida
03.06.07.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.06.07.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.06.07.03
Rendimiento
M3/DIA
EQ. 6.50
7.00
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.06.07.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 15.00
Unidad
239.28
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5333
9.21
4.91
147010003
OFICIAL
hh
3.00
1.6000
7.64
12.22
147010004
PEON
hh
6.00
3.2000
5.42
17.34
34.47
Materiales
205000004
M3
0.4410
70.00
30.87
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.4004
55.00
22.02
221000000
BOL
5.9500
22.00
130.90
239050000
AGUA
M3
0.1239
8.86
1.10
198.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
34.47
1.72
0.3733
11.25
4.20
5.92
Partida
03.06.07.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 8.00
Unidad
351.71
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
2.0000
9.21
18.42
147010003
OFICIAL
hh
3.00
3.0000
7.64
22.92
147010004
PEON
hh
6.00
6.0000
5.42
32.52
73.86
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
73.86
3.69
3.69
Partida
03.06.07.06
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.06.07.07
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.06.07.08
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 10.00
Unidad
47.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
14.74
Mano de Obra
147010002
OPERARIO
hh
2.00
1.6000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
20.85
Materiales
239020006
hja
0.0500
2.50
254060000
PINTURA ANTICORROSIVA
gln
0.0200
42.00
0.13
0.84
265000058
1.2500
20.00
25.00
25.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
20.85
1.04
1.04
Partida
03.07.01.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.01.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.01.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.01.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.07.01.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.01.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
211.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.7000
70.00
49.00
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
4.5000
22.00
99.00
239050000
AGUA
M3
0.2000
8.86
1.77
177.27
Equipos
349100011
hm
1.00
0.4444
11.25
5.00
5.00
Partida
03.07.01.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.07.01.08
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.07.01.09
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
338.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.07.01.10
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.01.11
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
Unidad
18.84
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
03.07.01.12
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.07.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
220.00
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.02.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.02.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.07.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.02.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
Mano de Obra
Cantidad
211.00
Precio S/.
Parcial S/.
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.7000
70.00
49.00
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
4.5000
22.00
99.00
239050000
AGUA
M3
0.2000
8.86
1.77
177.27
Equipos
349100011
hm
1.00
0.4444
11.25
5.00
5.00
Partida
03.07.02.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.07.02.08
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.07.02.09
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
338.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.07.02.10
Rendimiento
M2/DIA
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
30.65
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.02.11
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
Unidad
18.84
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
03.07.02.12
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.07.03.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.03.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.03.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.03.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.07.03.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.03.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
211.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.7000
70.00
49.00
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
4.5000
22.00
99.00
239050000
AGUA
M3
0.2000
8.86
1.77
177.27
Equipos
349100011
hm
1.00
0.4444
11.25
5.00
5.00
Partida
03.07.03.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
205010004
ARENA GRUESA
M3
0.3570
55.00
14.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.07.03.08
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.07.03.09
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
338.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.07.03.10
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.03.11
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
Unidad
18.84
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
7.37
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
03.07.03.12
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.07.04.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.04.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.04.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.04.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
Mano de Obra
Cantidad
7.00
Precio S/.
Parcial S/.
147010004
PEON
hh
1.00
1.2308
5.42
6.67
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.07.04.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.04.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
211.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.7000
70.00
49.00
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
4.5000
22.00
99.00
239050000
AGUA
M3
0.2000
8.86
1.77
177.27
Equipos
349100011
hm
1.00
0.4444
11.25
5.00
5.00
Partida
03.07.04.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.07.04.08
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
312.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.0000
9.21
9.21
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
36.93
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
36.93
1.85
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.23
Partida
03.07.04.09
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
338.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5540
55.00
44.10
30.47
221000000
BOL
9.0000
22.00
198.00
239050000
AGUA
M3
0.1790
8.86
1.59
274.16
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.07.04.10
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.04.11
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
Unidad
18.84
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
03.07.04.12
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.07.05.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.05.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.05.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.05.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.07.05.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.07.05.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 14.00
Unidad
319.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.1429
9.21
10.53
147010003
OFICIAL
hh
3.00
1.7143
7.64
13.10
147010004
PEON
hh
6.00
3.4286
5.42
18.58
42.21
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
42.21
2.11
349100011
hm
1.00
0.5714
11.25
6.43
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5714
7.50
4.29
12.83
Partida
03.07.05.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
10.20
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.05.08
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 80.00
Unidad
5.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0200
9.21
0.18
147010003
OFICIAL
hh
1.00
0.1000
7.64
0.76
147010004
PEON
hh
1.00
0.1000
5.42
0.54
1.48
Materiales
204000000
ARENA FINA
M3
0.0300
60.00
1.80
213000006
ASFALTO RC-250
gln
0.1500
14.50
2.18
243570051
LEA
CGA
0.0100
8.00
0.08
4.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.48
0.07
0.07
Partida
03.07.06.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.06.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
Mano de Obra
Cantidad
4.36
Precio S/.
Parcial S/.
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.06.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.06.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
59.99
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
1.00
0.4444
7.64
3.40
147010004
PEON
hh
4.00
1.7778
5.42
9.64
17.13
Materiales
205020051
M3
1.2000
35.00
42.00
42.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
17.13
0.86
0.86
Partida
03.07.06.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.07.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.07.07.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
Mano de Obra
Cantidad
4.36
Precio S/.
Parcial S/.
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.07.07.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.07.07.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
22.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
03.07.07.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
166.28
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.2700
70.00
18.90
205000033
M3
0.6500
35.00
22.75
205010004
ARENA GRUESA
M3
0.2550
55.00
14.03
221000000
BOL
3.5050
22.00
77.11
239050000
AGUA
M3
0.0920
8.86
0.82
133.61
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.50
5.0000
28.73
1.44
0.2222
11.25
2.50
3.94
Partida
03.07.07.06
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
ENCOFRADO Y DESENCOFRADO
14.00
EQ. 14.00
Unidad
30.65
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5714
9.21
5.26
147010003
OFICIAL
hh
1.00
0.5714
7.64
4.37
147010004
PEON
hh
2.00
1.1429
5.42
6.19
15.82
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.0000
3.40
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.0500
50.00
10.20
2.50
14.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
15.82
0.79
0.79
Partida
03.07.07.07
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 120.00
Unidad
8.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0667
9.21
0.61
147010003
OFICIAL
hh
0.50
0.0333
7.64
0.25
0.86
Materiales
288010002
1.0500
7.60
7.98
7.98
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.86
0.04
0.04
Partida
03.08.01.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.08.01.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.08.01.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.08.01.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.08.01.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
18.00
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.08.01.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
328.33
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.08.01.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 10.00
Unidad
47.81
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
2.00
1.6000
5.42
8.67
22.15
Materiales
202010061
Kg
0.1500
4.50
0.68
202040010
ALAMBRE NEGRO N8
Kg
0.1500
4.50
0.68
230200000
gln
0.0125
21.80
0.27
243010003
MADERA TORNILLO
p2
3.8000
3.40
12.92
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.2000
50.00
10.00
24.55
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
22.15
1.11
1.11
Partida
03.08.01.08
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.08.01.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
20.00
EQ. 20.00
Unidad
8.67
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4000
9.21
3.68
147010003
OFICIAL
hh
1.00
0.4000
7.64
3.06
6.74
Materiales
230990019
LIJA
UND
0.1000
2.00
0.20
253030027
THINER
gln
0.0080
16.00
0.13
254110011
PINTURA ESMALTE
gln
0.0420
30.00
1.26
1.59
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.74
0.34
0.34
Partida
03.08.01.10
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 40.00
Unidad
398.07
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.2000
9.21
1.84
147010004
PEON
hh
1.00
0.2000
5.42
1.08
2.92
Materiales
202060006
JGO
4.0000
8.00
32.00
256020000
UND
1.0000
345.00
345.00
377.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
1.00
5.0000
2.92
0.15
0.2000
90.00
18.00
18.15
Partida
03.08.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.08.02.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.08.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.08.02.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
6.50
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.08.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.08.02.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
328.33
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.08.02.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 10.00
Unidad
47.81
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
2.00
1.6000
5.42
8.67
22.15
Materiales
202010061
Kg
0.1500
4.50
0.68
202040010
ALAMBRE NEGRO N8
Kg
0.1500
4.50
0.68
230200000
gln
0.0125
21.80
0.27
243010003
MADERA TORNILLO
p2
3.8000
3.40
12.92
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.2000
50.00
10.00
24.55
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
22.15
1.11
1.11
Partida
03.08.02.08
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0400
9.21
0.37
Mano de Obra
147010002
OPERARIO
hh
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.08.02.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 20.00
Unidad
8.67
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4000
9.21
3.68
147010003
OFICIAL
hh
1.00
0.4000
7.64
3.06
6.74
Materiales
230990019
LIJA
UND
0.1000
2.00
0.20
253030027
THINER
gln
0.0080
16.00
0.13
254110011
PINTURA ESMALTE
gln
0.0420
30.00
1.26
1.59
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.74
0.34
0.34
Partida
03.08.02.10
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 50.00
Unidad
347.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.1600
9.21
1.47
147010004
PEON
hh
1.00
0.1600
5.42
0.87
2.34
Materiales
202060006
JGO
2.0000
8.00
16.00
256020100
UND
1.0000
315.00
315.00
331.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
1.00
5.0000
2.34
0.12
0.1600
90.00
14.40
14.52
Partida
03.08.03.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.08.03.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.08.03.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
3.00
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.08.03.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.08.03.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.08.03.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
328.33
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.08.03.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 10.00
Unidad
47.81
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
2.00
1.6000
5.42
8.67
22.15
Materiales
202010061
Kg
0.1500
4.50
0.68
202040010
ALAMBRE NEGRO N8
Kg
0.1500
4.50
0.68
230200000
gln
0.0125
21.80
0.27
243010003
MADERA TORNILLO
p2
3.8000
3.40
12.92
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.2000
50.00
10.00
24.55
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
22.15
1.11
1.11
Partida
03.08.03.08
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.08.03.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 20.00
Unidad
8.67
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4000
9.21
3.68
147010003
OFICIAL
hh
1.00
0.4000
7.64
3.06
6.74
Materiales
230990019
LIJA
UND
0.1000
2.00
0.20
253030027
THINER
gln
0.0080
16.00
0.13
254110011
PINTURA ESMALTE
gln
0.0420
30.00
1.26
1.59
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.74
0.34
0.34
Partida
03.08.03.10
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 60.00
Unidad
325.05
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.1333
9.21
1.23
147010004
PEON
hh
1.00
0.1333
5.42
0.72
1.95
Materiales
202060006
JGO
2.0000
8.00
16.00
239900099
UND
1.0000
295.00
295.00
311.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
1.00
5.0000
1.95
0.10
0.1333
90.00
12.00
12.10
Partida
03.08.04.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
03.08.04.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
03.08.04.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
03.08.04.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
03.08.04.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
03.08.04.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
328.33
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.3333
9.21
12.28
147010003
OFICIAL
hh
3.00
2.0000
7.64
15.28
147010004
PEON
hh
6.00
4.0000
5.42
21.68
49.24
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
49.24
2.46
349100011
hm
1.00
0.6667
11.25
7.50
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.6667
7.50
5.00
14.96
Partida
03.08.04.07
Rendimiento
M2/DIA
EQ. 10.00
47.81
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
2.00
1.6000
5.42
8.67
22.15
Materiales
202010061
Kg
0.1500
4.50
0.68
202040010
ALAMBRE NEGRO N8
Kg
0.1500
4.50
0.68
230200000
gln
0.0125
21.80
0.27
243010003
MADERA TORNILLO
p2
3.8000
3.40
12.92
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.2000
50.00
10.00
24.55
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
22.15
1.11
1.11
Partida
03.08.04.08
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
03.08.04.09
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 20.00
Unidad
33.58
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
3.68
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4000
9.21
147010003
OFICIAL
hh
2.00
0.8000
7.64
6.11
9.79
Materiales
230990019
LIJA
UND
0.5000
2.00
1.00
253030027
THINER
gln
0.0250
16.00
0.40
254110011
PINTURA ESMALTE
gln
0.2500
30.00
7.50
8.90
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.40
5.0000
9.79
0.49
0.1600
90.00
14.40
14.89
Partida
04.01.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 690.00
Unidad
3.43
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0023
9.21
0.02
147010003
OFICIAL
hh
0.20
0.0023
7.64
0.02
147010004
PEON
hh
2.00
0.0232
5.42
0.13
0.17
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0116
280.00
3.25
3.26
Partida
04.01.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 1,030.00
Unidad
4.70
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0078
9.21
0.07
147010004
PEON
hh
6.00
0.0466
5.42
0.25
0.32
Materiales
239050000
AGUA
M3
0.1000
8.86
0.89
0.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.32
0.02
349030013
hm
1.00
0.0078
150.00
1.17
349040033
hm
0.50
0.0039
230.00
0.90
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0078
180.00
1.40
3.49
Partida
04.01.03
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 3,150.00
Unidad
0.91
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0025
9.21
0.02
147010004
PEON
hh
4.00
0.0102
5.42
0.06
0.08
Equipos
349030013
hm
1.00
0.0025
150.00
0.38
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0025
180.00
0.45
0.83
Partida
04.01.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
400.00
EQ. 400.00
Unidad
4.88
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0100
7.64
0.08
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.08
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0200
130.00
2.60
349040009
hm
0.58
0.0116
190.00
2.20
4.80
Partida
04.02.01.01
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 575.00
Unidad
8.57
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010004
PEON
hh
2.00
0.0278
5.42
0.15
147010023
CONTROLADOR OFICIAL
hh
0.20
0.0028
7.64
0.02
0.17
Materiales
239020100
M3
1.0000
4.50
4.50
4.50
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040034
hm
1.00
5.0000
0.17
0.01
0.0139
280.00
3.89
3.90
Partida
04.02.01.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 792.00
Unidad
1.96
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.50
0.0051
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
349040009
hm
1.00
0.0101
190.00
1.92
1.92
Partida
04.02.01.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 320.00
Unidad
3.29
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.20
0.0050
7.64
0.04
Mano de Obra
147010023
CONTROLADOR OFICIAL
hh
0.04
Equipos
348110004
VOLQUETE DE 10 M3
hm
1.00
0.0250
130.00
3.25
3.25
Partida
04.02.01.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,820.00
Unidad
1.07
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0028
9.21
0.03
147010004
PEON
hh
6.00
0.0170
5.42
0.09
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0028
7.64
0.02
0.14
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.14
0.01
349030013
hm
1.00
0.0028
150.00
0.42
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0028
180.00
0.50
0.93
Partida
04.02.01.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
04.02.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,310.00
Unidad
18.67
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.03
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0035
9.21
147010004
PEON
hh
6.00
0.0208
5.42
0.11
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0035
7.64
0.03
0.17
Materiales
205000004
M3
0.2400
70.00
16.80
16.80
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.17
0.01
349030013
hm
1.00
0.0035
150.00
0.53
349030025
hm
1.00
0.0035
150.00
0.53
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0035
180.00
0.63
1.70
Partida
04.02.02.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
04.02.03.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 5,700.00
Unidad
6.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0014
9.21
0.01
147010004
PEON
hh
6.00
0.0084
5.42
0.05
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0014
7.64
0.01
0.07
Materiales
213000006
ASFALTO RC-250
gln
0.3000
14.50
4.35
253000000
KEROSENE INDUSTRIAL
gln
0.0675
13.50
0.91
5.26
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.07
349030061
hm
1.00
0.0014
150.00
0.21
349050003
hm
1.00
0.0014
200.00
0.28
349130004
hm
1.00
0.0014
250.00
0.35
0.84
Partida
04.02.03.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 4,367.00
Unidad
33.85
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0018
9.21
0.02
147010003
OFICIAL
hh
2.00
0.0037
7.64
0.03
147010004
PEON
hh
10.00
0.0183
5.42
0.10
0.15
Materiales
204000005
FILLER
Kg
2.2000
1.95
4.29
205000004
M3
0.0300
70.00
2.10
205010004
ARENA GRUESA
M3
0.0260
55.00
1.43
220010001
gln
1.8000
9.50
17.10
230220011
gln
0.0850
35.00
2.98
253100003
PETROLEO
gln
0.3000
12.00
3.60
31.50
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.15
0.01
349040009
hm
1.00
0.0018
190.00
0.34
349050004
hm
0.50
0.0009
100.00
0.09
349050015
hm
1.00
0.0018
230.00
0.41
349050020
hm
1.00
0.0018
750.00
1.35
2.20
Partida
04.02.03.03
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 3,818.00
Unidad
0.27
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0021
130.00
0.27
Equipos
348110004
VOLQUETE DE 10 M3
hm
0.27
Partida
04.02.03.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 4,367.00
Unidad
1.49
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0018
9.21
0.02
147010003
OFICIAL
hh
3.00
0.0055
7.64
0.04
147010004
PEON
hh
6.00
0.0110
5.42
0.06
0.12
Materiales
204000000
ARENA FINA
M3
0.0020
60.00
0.12
230460039
UND
0.0010
35.00
0.04
253100003
PETROLEO
gln
0.0250
12.00
0.30
0.46
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.12
0.01
349030025
hm
1.00
0.0018
150.00
0.27
349030043
hm
1.00
0.0018
150.00
0.27
349250001
PAVIMENTADORA DE 65 HP
hm
1.00
0.0018
200.00
0.36
0.91
Partida
04.02.04.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 4,400.00
Unidad
5.15
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0018
9.21
0.02
147010004
PEON
hh
6.00
0.0109
5.42
0.06
147010023
CONTROLADOR OFICIAL
hh
1.00
0.0018
7.64
0.01
0.09
Materiales
205000004
M3
0.0600
70.00
4.20
4.20
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.09
349030013
hm
1.00
0.0018
150.00
0.27
349030025
hm
1.00
0.0018
150.00
0.27
349090000
MOTONIVELADORA DE 125 HP
hm
1.00
0.0018
180.00
0.32
0.86
Partida
04.02.04.02
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 91.00
Unidad
8.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
0.0879
5.42
0.48
Mano de Obra
147010004
PEON
hh
0.48
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
3.0000
0.48
0.01
348040003
hm
1.00
0.0879
90.00
7.91
348080000
MOTOBOMBA 10 HP 4"
hm
0.40
0.0352
12.00
0.42
8.34
Partida
04.03.01.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
04.03.01.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
04.03.01.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
04.03.01.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.78
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0073
9.21
0.07
147010003
OFICIAL
hh
1.00
0.0364
7.64
0.28
147010004
PEON
hh
2.00
0.0727
5.42
0.39
0.74
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.74
0.04
0.04
Partida
04.03.01.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
80.23
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.1333
9.21
1.23
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
2.00
1.3333
5.42
7.23
13.55
Materiales
205010004
ARENA GRUESA
M3
1.2000
55.00
66.00
66.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
13.55
0.68
0.68
Partida
04.03.01.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
Cantidad
22.17
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.31
Materiales
205300085
MATERIAL SELECCIONADO
M3
1.0000
4.00
4.00
239050000
AGUA
M3
0.1000
8.86
0.89
4.89
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349030004
hm
1.00
5.0000
9.31
0.47
0.6667
11.25
7.50
7.97
Partida
04.03.01.07
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 10.00
Unidad
5.33
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0800
9.21
0.74
147010004
PEON
hh
1.00
0.8000
5.42
4.34
5.08
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
5.08
0.25
0.25
Partida
04.03.01.08
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
04.03.01.09
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 40.00
Unidad
338.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.2000
9.21
1.84
147010004
PEON
hh
6.00
1.2000
5.42
6.50
8.34
Materiales
273010060
1.0000
330.00
330.00
330.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
8.34
0.42
0.42
Partida
04.03.01.10
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
211.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.7000
70.00
49.00
205010004
ARENA GRUESA
M3
0.5000
55.00
27.50
221000000
BOL
4.5000
22.00
99.00
239050000
AGUA
M3
0.2000
8.86
1.77
177.27
Equipos
349100011
hm
1.00
0.4444
11.25
5.00
5.00
Partida
04.03.01.11
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
04.03.01.12
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
265.03
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5000
9.21
4.61
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
32.33
Materiales
205000004
M3
0.5400
70.00
205010004
ARENA GRUESA
M3
0.5100
55.00
37.80
28.05
221000000
BOL
7.0100
22.00
154.22
239050000
AGUA
M3
0.1840
8.86
1.63
221.70
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
32.33
1.62
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.00
Partida
04.03.01.13
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 14.00
Unidad
319.17
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
1.1429
9.21
10.53
147010003
OFICIAL
hh
3.00
1.7143
7.64
13.10
147010004
PEON
hh
6.00
3.4286
5.42
18.58
42.21
Materiales
205000004
M3
0.6300
70.00
205010004
ARENA GRUESA
M3
0.5720
55.00
44.10
31.46
221000000
BOL
8.5000
22.00
187.00
239050000
AGUA
M3
0.1770
8.86
1.57
264.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
42.21
2.11
349100011
hm
1.00
0.5714
11.25
6.43
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5714
7.50
4.29
12.83
Partida
04.03.01.14
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
38.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.6667
9.21
6.14
147010003
OFICIAL
hh
1.00
0.6667
7.64
5.09
147010004
PEON
hh
2.00
1.3333
5.42
7.23
18.46
Materiales
202010061
Kg
0.1250
4.50
0.56
202040010
ALAMBRE NEGRO N8
Kg
0.1250
4.50
0.56
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
3.1000
3.40
10.54
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
0.1500
50.00
7.50
19.38
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
18.46
0.92
0.92
Partida
04.03.01.15
Rendimiento
M2/DIA
TARRAJEO Y ACABADOS
10.00
EQ. 10.00
18.84
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
7.37
Mano de Obra
147010002
OPERARIO
hh
1.00
0.8000
9.21
147010003
OFICIAL
hh
1.00
0.8000
7.64
6.11
147010004
PEON
hh
0.20
0.1600
5.42
0.87
14.35
Materiales
204000000
ARENA FINA
M3
0.0180
60.00
1.08
221000000
BOL
0.1200
22.00
2.64
239050000
AGUA
M3
0.0020
8.86
0.02
243010003
MADERA TORNILLO
p2
0.0100
3.40
0.03
3.77
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.35
0.72
0.72
Partida
04.03.01.16
Rendimiento
Kg/DIA
Cdigo
Descripcin Recurso
ACERO FY=4200KG/CM2
200.00
EQ. 200.00
Unidad
4.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010003
OFICIAL
hh
1.00
0.0400
7.64
0.31
0.68
Materiales
202040009
Kg
0.0600
4.50
0.27
203030048
Kg
1.0000
3.10
3.10
239060013
HOJA DE SIERRA
UND
0.0200
5.00
0.10
3.47
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.68
0.03
0.03
Partida
04.03.02.01
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 220.00
Unidad
0.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0036
9.21
0.03
147010004
PEON
hh
1.00
0.0364
5.42
0.20
0.23
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.23
0.01
0.01
Partida
04.03.02.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
TRAZO Y REPLANTEO
200.00
EQ. 200.00
Unidad
4.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000032
TOPOGRAFO
hh
1.00
0.0400
10.51
0.42
147010002
OPERARIO
hh
1.00
0.0400
9.21
0.37
147010004
PEON
hh
2.00
0.0800
5.42
0.43
1.22
Materiales
202010061
Kg
0.1500
4.50
0.68
229030002
BOL
0.0500
5.00
0.25
243010003
MADERA TORNILLO
p2
0.6000
3.40
2.04
2.97
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.22
0.06
349190005
TEODOLITO Y MIRAS
hm
0.20
0.0080
6.25
0.05
349890001
NIVEL TOPOGRAFICO
hm
0.40
0.0160
3.75
0.06
0.17
Partida
04.03.02.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
17.76
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
1.00
2.6667
5.42
14.45
16.91
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
16.91
0.85
0.85
Partida
04.03.02.04
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
6.50
EQ. 6.50
Unidad
7.00
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
1.00
1.2308
5.42
6.67
Mano de Obra
147010004
PEON
hh
6.67
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
6.67
0.33
0.33
Partida
04.03.02.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 18.00
Unidad
202.86
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.4444
9.21
4.09
147010003
OFICIAL
hh
3.00
1.3333
7.64
10.19
147010004
PEON
hh
6.00
2.6667
5.42
14.45
28.73
Materiales
205000004
M3
0.3780
70.00
26.46
205000033
M3
0.4000
35.00
14.00
205010004
ARENA GRUESA
M3
0.3570
55.00
19.64
221000000
BOL
4.9070
22.00
107.95
239050000
AGUA
M3
0.1288
8.86
1.14
169.19
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
0.70
5.0000
28.73
1.44
0.3111
11.25
3.50
4.94
Partida
04.03.02.06
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 16.00
Unidad
265.03
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.5000
9.21
4.61
147010003
OFICIAL
hh
3.00
1.5000
7.64
11.46
147010004
PEON
hh
6.00
3.0000
5.42
16.26
32.33
Materiales
205000004
M3
0.5400
70.00
205010004
ARENA GRUESA
M3
0.5100
55.00
37.80
28.05
221000000
BOL
7.0100
22.00
154.22
239050000
AGUA
M3
0.1840
8.86
1.63
221.70
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
32.33
1.62
349100011
hm
1.00
0.5000
11.25
5.63
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
1.00
0.5000
7.50
3.75
11.00
Partida
04.03.02.07
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 60.00
Unidad
7.78
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.1333
9.21
1.23
147010003
OFICIAL
hh
1.00
0.1333
7.64
1.02
147010004
PEON
hh
1.00
0.1333
5.42
0.72
2.97
Materiales
202010061
Kg
0.0500
4.50
0.23
202040009
Kg
0.0200
4.50
0.09
202040010
ALAMBRE NEGRO N8
Kg
0.0400
4.50
0.18
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
1.1600
3.40
3.94
4.66
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
2.97
0.15
0.15
Partida
04.03.03.01
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 45.00
Unidad
1.18
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0178
9.21
0.16
147010004
PEON
hh
1.00
0.1778
5.42
0.96
1.12
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.12
0.06
0.06
Partida
04.03.03.02
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 600.00
Unidad
0.42
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.0013
9.21
0.01
147010003
OFICIAL
hh
1.00
0.0133
7.64
0.10
147010004
PEON
hh
4.00
0.0533
5.42
0.29
0.40
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.40
0.02
0.02
Partida
04.03.03.03
Rendimiento
ML/DIA
Cdigo
Descripcin Recurso
EQ. 170.00
Unidad
27.45
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
0.0941
9.21
0.87
147010003
OFICIAL
hh
3.00
0.1412
7.64
1.08
147010004
PEON
hh
6.00
0.2824
5.42
1.53
3.48
Materiales
205000004
M3
0.0570
70.00
205010004
ARENA GRUESA
M3
0.0535
55.00
3.99
2.94
221000000
BOL
0.7350
22.00
16.17
239050000
AGUA
M3
0.0193
8.86
0.17
23.27
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349100011
hm
1.00
5.0000
3.48
0.17
0.0471
11.25
0.53
0.70
Partida
04.03.03.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 22.00
Unidad
13.47
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.3636
9.21
3.35
147010003
OFICIAL
hh
1.00
0.3636
7.64
2.78
147010004
PEON
hh
1.00
0.3636
5.42
1.97
8.10
Materiales
202010061
Kg
0.0500
4.50
0.23
202040009
Kg
0.0200
4.50
0.09
230200000
gln
0.0100
21.80
0.22
243010003
MADERA TORNILLO
p2
1.3000
3.40
4.42
4.96
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
8.10
0.41
0.41
Partida
04.03.03.05
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
EQ. 80.00
Unidad
5.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.0200
9.21
0.18
147010003
OFICIAL
hh
1.00
0.1000
7.64
0.76
147010004
PEON
hh
1.00
0.1000
5.42
0.54
1.48
Materiales
204000000
ARENA FINA
M3
0.0300
60.00
1.80
213000006
ASFALTO RC-250
gln
0.1500
14.50
2.18
243570051
LEA
CGA
0.0100
8.00
0.08
4.06
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
1.48
0.07
0.07
Partida
04.03.04.01
Rendimiento
M2/DIA
PINTURA EN PAVIMENTO
250.00
EQ. 250.00
16.90
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
2.00
0.0640
9.21
0.59
147010003
OFICIAL
hh
2.00
0.0640
7.64
0.49
147010004
PEON
hh
4.00
0.1280
5.42
0.69
1.77
Materiales
229200013
THINNER ACRILICO
gln
0.0310
18.00
0.56
230300006
Kg
0.4500
10.50
4.73
254020036
gln
0.1100
45.00
4.95
10.24
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348950003
hm
1.00
5.0000
1.77
0.09
0.0320
150.00
4.80
4.89
Partida
04.03.04.02
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
DELINEADORES VERTICALES
25.00
EQ. 25.00
Unidad
73.34
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
2.95
Mano de Obra
147010002
OPERARIO
hh
1.00
0.3200
9.21
147010003
OFICIAL
hh
2.00
0.6400
7.64
4.89
147010004
PEON
hh
8.00
2.5600
5.42
13.88
21.72
Materiales
205000004
M3
0.0072
70.00
0.50
205000033
M3
0.0060
35.00
0.21
205010004
ARENA GRUESA
M3
0.0080
55.00
0.44
221000000
BOL
0.1000
22.00
2.20
239050000
AGUA
M3
0.0030
8.86
0.03
254110011
PINTURA ESMALTE
gln
0.0250
30.00
0.75
262000015
UND
1.0000
32.00
32.00
36.13
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.50
5.0000
21.72
1.09
0.1600
90.00
14.40
15.49
Partida
04.03.04.03
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
TACHAS DELINEADORAS
120.00
EQ. 120.00
Unidad
9.61
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0667
9.21
0.61
147010003
OFICIAL
hh
1.00
0.0667
7.64
0.51
147010004
PEON
hh
2.00
0.1333
5.42
0.72
1.84
Materiales
213010000
PEGAMENTO ASFALTICO
gln
0.0010
75.00
0.08
262000016
UND
1.0000
4.60
4.60
4.68
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.50
5.0000
1.84
0.09
0.0333
90.00
3.00
3.09
Partida
05.01.01
Rendimiento
MES/DIA
Cdigo
Descripcin Recurso
SUPERVISION Y VIGILANCIA
1.00
EQ. 1.00
Unidad
4,000.00
Cantidad
Precio S/.
Parcial S/.
1.0000
3,000.00
3,000.00
Mano de Obra
147000040
MES
3,000.00
Materiales
230750100
BOLETIN AMBIENTAL
UND
100.0000
1.00
100.00
239080044
UTILES DE ESCRITORIO
GLB
1.0000
300.00
300.00
239080045
GLB
1.0000
600.00
600.00
1,000.00
Partida
05.02.01
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 4.00
Unidad
206.02
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
2.0000
9.21
18.42
147010003
OFICIAL
hh
1.00
2.0000
7.64
15.28
147010004
PEON
hh
2.00
4.0000
5.42
21.68
55.38
Materiales
202010061
Kg
0.1200
4.50
0.54
205000004
M3
0.1200
70.00
8.40
205000033
M3
0.0800
35.00
2.80
205010004
ARENA GRUESA
M3
0.0510
55.00
2.81
221000000
BOL
0.6400
22.00
14.08
239050000
AGUA
M3
0.0300
8.86
0.27
243010003
MADERA TORNILLO
p2
2.0500
3.40
6.97
243600011
pza
2.0000
8.00
16.00
256020101
UND
1.0000
60.00
60.00
111.87
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.20
5.0000
55.38
2.77
0.4000
90.00
36.00
38.77
Partida
05.03.01
Rendimiento
HA/DIA
Cdigo
Descripcin Recurso
EQ. 1.00
Unidad
4,503.20
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
8.0000
9.21
73.68
147010004
PEON
hh
30.00
240.0000
5.42
1,300.80
1,374.48
Materiales
204010003
M3
239090050
UND
20.0000
20.00
400.00
1,150.0000
2.00
2,300.00
2,700.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.50
5.0000
1,374.48
68.72
4.0000
90.00
360.00
428.72
Partida
05.04.01
Rendimiento
KM/DIA
Cdigo
Descripcin Recurso
EQ. 3.00
Unidad
333.64
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.10
0.2667
9.21
2.46
147010004
PEON
hh
6.00
16.0000
5.42
86.72
89.18
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
1.00
5.0000
89.18
4.46
2.6667
90.00
240.00
244.46
Partida
05.04.02
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 950.00
Unidad
1.14
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0084
9.21
0.08
147010004
PEON
hh
6.00
0.0505
5.42
0.27
0.35
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
0.35
0.02
348110004
VOLQUETE DE 10 M3
hm
0.40
0.0034
130.00
0.44
349040009
hm
0.10
0.0008
190.00
0.15
349040033
hm
0.10
0.0008
230.00
0.18
0.79
Partida
05.04.03
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 4.00
Unidad
30.23
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
0.20
0.4000
9.21
3.68
147010004
PEON
hh
2.00
4.0000
5.42
21.68
25.36
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
348110002
VOLQUETE DE 6 M3
hm
0.02
5.0000
25.36
1.27
0.0400
90.00
3.60
4.87
Partida
05.04.04
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
EQ. 2,100.00
Unidad
Cantidad
1.03
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0038
9.21
0.03
147010004
PEON
hh
6.00
0.0229
5.42
0.12
0.15
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040033
hm
1.00
5.0000
0.15
0.01
0.0038
230.00
0.87
0.88
Partida
05.04.05
Rendimiento
M3/DIA
Cdigo
Descripcin Recurso
EQ. 2,600.00
Unidad
0.89
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.0031
9.21
0.03
147010004
PEON
hh
6.00
0.0185
5.42
0.10
0.13
Materiales
239090050
UND
0.0200
2.00
0.04
0.04
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
349040033
hm
1.00
5.0000
0.13
0.01
0.0031
230.00
0.71
0.72
Partida
05.05.01
Rendimiento
GLB/DIA
Cdigo
Descripcin Recurso
PLAN DE CONTINGENCIAS
1.00
EQ. 1.00
Unidad
3,500.00
Cantidad
Precio S/.
Parcial S/.
1.0000
3,500.00
3,500.00
Materiales
239080049
GLB
3,500.00
Partida
06.01.01
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 8.00
Unidad
60.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
9.21
Mano de Obra
147010002
OPERARIO
hh
1.00
1.0000
9.21
147010004
PEON
hh
1.00
1.0000
5.42
5.42
14.63
Materiales
239150005
UND
1.0000
45.00
45.00
45.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.63
0.73
0.73
Partida
06.01.02
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 6.00
Unidad
65.49
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
12.28
Mano de Obra
147010002
OPERARIO
hh
1.00
1.3333
9.21
147010004
PEON
hh
1.00
1.3333
5.42
7.23
19.51
Materiales
239150005
UND
1.0000
45.00
45.00
45.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
19.51
0.98
0.98
Partida
06.02.01
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
ENSAYO DE DENSIDAD DE LAS PROBETAS DE REFERENCIA, DE DENSIDAD DE LA MEZCLA ASFLTICA COMPACTADA IN SITU.
4.00
EQ. 4.00
Unidad
160.72
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
2.0000
9.21
18.42
147010004
PEON
hh
1.00
2.0000
5.42
10.84
29.26
Materiales
237040035
UND
1.0000
55.00
55.00
237040036
UND
1.0000
50.00
50.00
237040037
UND
1.0000
25.00
25.00
130.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
29.26
1.46
1.46
Partida
06.02.02
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 4.00
Unidad
90.72
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
2.0000
9.21
18.42
147010004
PEON
hh
1.00
2.0000
5.42
10.84
29.26
Materiales
237040038
UND
1.0000
60.00
60.00
60.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
29.26
1.46
1.46
Partida
06.02.03
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 8.00
Unidad
65.36
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
9.21
Mano de Obra
147010002
OPERARIO
hh
1.00
1.0000
9.21
147010004
PEON
hh
1.00
1.0000
5.42
5.42
14.63
Materiales
237040039
UND
1.0000
50.00
50.00
50.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
14.63
0.73
0.73
Partida
06.03.01
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 12.00
Unidad
40.24
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
0.6667
9.21
6.14
147010004
PEON
hh
1.00
0.6667
5.42
3.61
9.75
Materiales
239150000
UND
1.0000
30.00
30.00
30.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
9.75
0.49
0.49
Partida
06.03.02
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 4.00
Unidad
240.03
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
18.42
Mano de Obra
147010002
OPERARIO
hh
1.00
2.0000
9.21
147010004
PEON
hh
0.50
1.0000
5.42
5.42
23.84
Materiales
239150007
UND
1.0000
30.00
30.00
239150008
UND
1.0000
35.00
35.00
239150009
UND
1.0000
30.00
30.00
239150010
ANALISIS GRANULOMETRICO
UND
1.0000
120.00
120.00
215.00
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
23.84
1.19
1.19
Partida
07.01.00
Rendimiento
GLB/DIA
Cdigo
Descripcin Recurso
EQ. 0.50
Unidad
4,500.00
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000011
INGENIERO VIAL
GLB
0.4000
4,000.00
1,600.00
147010101
ASISTENTE SOCIAL
GLB
1.0000
2,000.00
2,000.00
3,600.00
Materiales
239080044
UTILES DE ESCRITORIO
GLB
1.0000
300.00
300.00
239080045
GLB
1.0000
600.00
600.00
900.00
Partida
07.02.00
Rendimiento
HA/DIA
Cdigo
Descripcin Recurso
EQ. 520.00
Unidad
93,400.00
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147000041
GLB
0.7000
2,000.00
1,400.00
147010101
ASISTENTE SOCIAL
GLB
1.0000
2,000.00
2,000.00
3,400.00
Materiales
239080050
HA
1.0000
90,000.00
90,000.00
90,000.00
Partida
08.01.00
Rendimiento
UND/DIA
Cdigo
Descripcin Recurso
EQ. 1.00
Unidad
990.80
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
147010002
OPERARIO
hh
1.00
8.0000
9.21
73.68
147010003
OFICIAL
hh
1.00
8.0000
7.64
61.12
147010004
PEON
hh
2.00
16.0000
5.42
86.72
221.52
Materiales
202010061
Kg
0.4300
4.50
1.94
202040009
Kg
0.1500
4.50
0.68
204000000
ARENA FINA
M3
0.1000
60.00
6.00
205000004
M3
0.4200
70.00
29.40
205000033
M3
0.3500
35.00
12.25
205010004
ARENA GRUESA
M3
0.3000
55.00
16.50
221000000
BOL
4.1500
22.00
91.30
239050000
AGUA
M3
0.1275
8.86
1.13
243010003
MADERA TORNILLO
p2
35.0000
3.40
119.00
279560004
UND
1.0000
480.00
480.00
758.20
Equipos
337010001
HERRAMIENTAS MANUALES
%MO
5.0000
221.52
11.08
11.08
Partida
09.01.00
Rendimiento
GLB/DIA
Cdigo
Descripcin Recurso
FLETE TERRESTRE
1.00
EQ. 1.00
Unidad
32,796.77
Cantidad
Precio S/.
Parcial S/.
1.0000
32,796.77
32,796.77
Materiales
232010096
GLB
32,796.77
OBRA
UBICACIN
ITEM
PERSONAL
147000011
INGENIERO VIAL
147000032
TOPOGRAFO
147000040
147000041
147010002
OPERARIO
147010003
OFICIAL
147010004
147010023
147010025
PERFORISTA OFICIAL
147010101
ASISTENTE SOCIAL
UND.
GLB
CANT.
PRECIO
PRESUP. (S/.)
0.40
4000.00
1600.00
880.02
10.51
9247.89
MES
6.00
3000.00
18000.00
GLB
0.39
2000.00
784.00
hh
12321.86
9.21
113705.05
hh
12739.84
7.64
97535.68
PEON
hh
50768.03
5.42
275465.50
CONTROLADOR OFICIAL
hh
957.41
7.64
7236.47
hh
5.61
7.64
42.97
GLB
1.56
2000.00
3120.00
hh
TOTAL
526,737.56
OBRA
UBICACIN
ITEM
CONSOLIDADO INSUMOS
CODIGO
MATERIALES
UND.
CANT.
PRECIO
PRESUP. (S/.)
230200000
gln
81.80
21.80
1798.19
230220011
gln
313.27
35.00
10982.79
239050000
AGUA
M3
724.33
8.86
6437.52
202040009
Kg
2660.48
4.50
11972.14
202040010
ALAMBRE NEGRO N8
Kg
921.35
4.50
4129.99
239150010
ANALISIS GRANULOMETRICO
UND
1.00
120.00
120.00
228010005
ANFO
Kg
13.16
8.20
107.87
204000000
ARENA FINA
M3
62.45
60.00
3746.87
205010004
ARENA GRUESA
M3
1019.85
55.00
56090.93
213000006
ASFALTO RC-250
gln
1263.40
14.50
18324.57
230020098
JGO
0.18
1480.00
259.59
230750100
BOLETIN AMBIENTAL
UND
600.00
1.00
600.00
259010059
pln
330.00
13.00
4290.00
220010001
gln
6633.90
9.50
63022.05
221000000
BOL
13286.07
22.00
292291.75
202130021
Kg
16.00
6.50
104.00
202010061
Kg
1471.30
4.50
6625.83
227010000
CORDON DETONANTE 3P
78.93
1.00
78.93
239020100
M3
24390.99
4.50
109759.46
262000015
UND
56.00
32.00
1792.00
228000022
DINAMITA
Kg
4.39
16.50
72.79
237040036
UND
5.00
50.00
250.00
237040037
UND
5.00
25.00
125.00
237040035
UND
5.00
55.00
275.00
237040039
UND
5.00
50.00
250.00
237040038
UND
5.00
60.00
300.00
243510062
ESTACA DE MADERA
UND
2420.60
0.50
1210.30
203030048
Kg
44182.55
3.10
136965.93
204000005
FILLER
Kg
8108.10
1.95
15810.80
227020011
FULMINANTE
UND
43.85
1.50
65.78
239060013
HOJA DE SIERRA
UND
876.95
5.00
4384.76
239080045
GLB
7.00
600.00
4200.00
239080049
GLB
1.00
3500.00
3500.00
253000000
KEROSENE INDUSTRIAL
gln
248.77
13.50
3353.81
217000021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
978.25
0.50
489.13
243570051
LEA
CGA
10.52
8.00
84.14
230990019
LIJA
UND
35.47
2.00
70.94
239020006
hja
2.98
2.50
7.75
244010019
p2
420.00
1.90
798.00
243010003
MADERA TORNILLO
p2
25187.71
3.40
85633.13
205300085
MATERIAL SELECCIONADO
M3
911.86
4.00
3647.44
227000010
MECHA LENTA
17.54
1.10
19.29
230300006
Kg
63.00
10.50
662.20
232970002
MOVILIZACION Y DESMOVILIZACION
GLB
2.00
17730.00
35460.00
239080050
HA
0.56
90000.00
50400.00
213010000
PEGAMENTO ASFALTICO
gln
0.38
75.00
30.24
202060006
253100003
PETROLEO
JGO
242.00
8.00
1936.00
gln
1197.79
12.00
14373.45
OBRA
UBICACIN
ITEM
205000004
M3
2040.16
70.00
142810.94
OBRA
UBICACIN
ITEM
205020051
M3
29.28
35.00
1024.80
205000033
M3
206.19
35.00
7216.77
254060000
PINTURA ANTICORROSIVA
gln
1.19
42.00
50.06
254110011
PINTURA ESMALTE
gln
41.41
30.00
1242.19
254020036
gln
15.40
45.00
693.00
279560004
UND
1.00
480.00
480.00
239090050
UND
1581.62
2.00
3163.23
239150009
UND
1.00
30.00
30.00
239150000
UND
30.00
30.00
900.00
239150008
UND
1.00
35.00
35.00
239150007
UND
1.00
30.00
30.00
239150005
UND
114.00
45.00
5130.00
230460039
UND
3.69
35.00
147.42
243600011
pza
56.00
8.00
448.00
243600037
UND
12.00
30.00
360.00
256020000
UND
25.00
345.00
8625.00
256020101
UND
28.00
60.00
1680.00
239900099
UND
32.00
295.00
9440.00
256020100
UND
39.00
315.00
12285.00
262000016
UND
378.00
4.60
1738.80
253030027
THINER
gln
2.44
16.00
39.33
229200013
THINNER ACRILICO
gln
4.34
18.00
78.40
204010003
M3
19.00
20.00
380.00
232010096
GLB
1.00
32796.77
32796.77
245010007
TRIPLAY 4 X 8 X 6 MM.
pln
407.06
50.00
20353.05
273010060
8.19
330.00
2702.70
288010002
17.22
7.60
130.87
265000058
74.50
20.00
1490.00
239080044
UTILES DE ESCRITORIO
GLB
7.00
300.00
2100.00
221020007
UND
0.15
80.00
11.92
229030002
BOL
277.09
5.00
1385.49
TOTAL
1,215,909.10
OBRA
UBICACIN
ITEM
CONSOLIDADO EQUIPOS
CODIGO
EQUIPOS
UND.
CANT.
PRECIO
PRESUP. (S/.)
349050003
hm
5.16
200.00
349050004
hm
3.32
100.00
331.70
348040003
hm
529.72
90.00
47668.98
349130004
hm
5.16
250.00
1289.93
349040009
hm
557.22
190.00
105792.31
349030004
hm
607.94
11.25
6838.96
349020011
hm
2.81
150.00
420.96
348950003
hm
4.48
150.00
672.00
337010001
HERRAMIENTAS MANUALES
349060006
hm
5.61
30.00
168.38
349100011
hm
844.26
11.25
9502.19
348080000
MOTOBOMBA 10 HP 4"
hm
212.13
12.00
2531.09
349090000
MOTONIVELADORA DE 125 HP
hm
752.67
180.00
134961.23
349890001
NIVEL TOPOGRAFICO
hm
625.39
3.75
2345.36
349250001
PAVIMENTADORA DE 65 HP
hm
6.63
200.00
1326.78
349050020
hm
6.63
750.00
4975.43
349030013
hm
753.47
150.00
113712.72
349030025
hm
19.97
150.00
3014.15
349030043
hm
6.63
150.00
995.09
349050015
hm
6.63
230.00
1511.06
349190005
TEODOLITO Y MIRAS
hm
201.71
6.25
1260.61
349040033
hm
116.93
230.00
26792.39
349040034
hm
593.16
280.00
166079.20
349030061
hm
5.16
150.00
773.96
349520002
VIBRADOR DE 4 HP CAP.=1.50"
hm
564.19
7.50
4231.83
348110004
VOLQUETE DE 10 M3
hm
1120.63
130.00
145664.89
348110002
VOLQUETE DE 6 M3
hm
417.02
%MO
1031.94
24580.75
90.00
TOTAL
37347.68
845,821.57
PRESUPUESTO ANALITICO
PROYECTO
OBRA
UBICACIN
ITEM
CODIGO
GASTOS
GENERALES
DESCRIPCION
01.00
RETRIBUCIONES Y COMPLEMENTOS
01.01
GASTOS
SUPERVISION
COSTO DIRECTO
TOTAL
126,000.00
431,752.10
557,752.10
11,340.00
38,857.69
50,197.69
01.02
16,380.00
56,127.77
72,507.77
02.00
VIATICOS Y ASIGNACIONES
2,400.00
4,200.00
6,600.00
03.00
VESTUARIOS
1,735.00
240.00
1,975.00
04.00
COMBUSTIBLE Y LUBRICANTE
9,820.00
2,162.00
11,982.00
05.00
06.00
SERVICIOS NO PERSONALES
07.00
MATERIALES DE CONSTRUCCION
08.00
09.00
10.00
11.00
MATERIALES DE ESCRITORIO
1,471.50
148.00
12.00
2,700.00
200.00
13.00
14.00
14.01
SERVICIO DE LUZ
14.02
14.03
15.00
69,502.52
30,000.00
344.66
99,502.52
1,209,264.44
1,209,264.44
800.00
24,580.75
25,380.75
1,200.00
600.00
10,620.00
2,100.00
821,240.82
849,240.82
600.00
43,370.00
3,719.50
2,900.00
271,949.02
1,200.00
10,620.00
28,000.00
TOTALES S/.
344.66
2,588,467.75
2,903,786.77
2,903,786.77
OBRA
UBICACIN
ITEM
CODIGO
01.00
01.01
DESCRIPCION
COEF.
UNID.
INGENIERO RESIDENTE
MES
ASISTENTE RESIDENTE
ASISTENTE ADMINISTRATIVO
MAESTRO DE OBRA
UNIT.
PARCIAL
6.00
4,000.00
24,000.00
MES
6.00
2,200.00
26,400.00
MES
6.00
2,000.00
12,000.00
MES
6.00
2,000.00
12,000.00
RESPONSABLE DE ALMACEN
MES
6.00
1,600.00
9,600.00
GUARDIAN O CONSERGE
MES
6.00
1,400.00
16,800.00
CHOFER
MES
6.00
1,400.00
16,800.00
ENFERMERO
MES
6.00
1,400.00
8,400.00
GLB
0.09
126,000.00
11,340.00
GLB
0.13
126,000.00
16,380.00
MES
6.00
400.00
2,400.00
126,000.00
11,340.00
16,380.00
VIATICOS Y ASIGNACIONES
VIATICOS Y ASIGNACIONES
03.00
TOTAL
RETRIBUCIONES ECONOMICAS
CANT.
2,400.00
1
VESTUARIOS
1,735.00
UND
4.00
15.00
60.00
PAR
2.00
47.50
95.00
PAR
2.00
47.50
95.00
CASCO DE PROTECCION
UND
15.00
15.00
225.00
PAR
10.00
25.00
250.00
LENTES DE SEGURIDAD
UND
15.00
10.00
150.00
PAR
15.00
12.00
180.00
GUANTES DE JEBE
PAR
5.00
12.00
60.00
UND
15.00
30.00
450.00
GUANTES DE ASBESTO
PAR
1.00
90.00
90.00
MASCARA ANTIGAS
UND
1.00
80.00
80.00
GLN
700.00
12.00
8,400.00
GASOLINA 84 OCTANOS
GLN
40.00
13.00
520.00
ACEITES Y LUBRICANTES
GLB
1.00
900.00
900.00
GLB
Km.
37.24
800.00
29,792.00
GLB
1.00
39,710.52
39,710.52
GLB
GLB
1.00
800.00
800.00
GLB
1.00
MES
6.00
04.00
05.00
COMBUSTIBLE Y LUBRICANTE
06.00
07.00
09.00
11.00
69,502.52
MATERIALES DE CONSTRUCCION
BIENES DE CONSUMO
800.00
10.00
MATERIALES DE CONSTRUCCION
08.00
9,820.00
1,200.00
200.00
1,200.00
ENSAYOS DE LABORATORIO
GLB
MES
ASISTENTE TECNICO
MES
1,471.50
UND
5.00
6.00
30.00
OBRA
UBICACIN
ITEM
CODIGO
DESCRIPCION
13.00
PARCIAL
TOTAL
5.00
6.50
32.50
UND
3.00
10.00
30.00
UND
3.00
26.00
78.00
MILLAR
6.00
28.00
168.00
UND
20.00
0.50
10.00
LIBRETA DE CAMPO
UND
10.00
3.50
35.00
CAJA
1.00
48.00
48.00
PAPEL CARBON
PQT
1.00
17.00
17.00
UND
10.00
1.20
12.00
UND
2.00
240.00
480.00
UND
20.00
0.20
4.00
UND
1.00
34.00
34.00
UND
1.00
12.00
12.00
PERFORADOR GRANDE
UND
1.00
18.00
18.00
PERFORADOR GPEQUEO
UND
1.00
10.00
10.00
SACA GRAPAS
UND
2.00
2.00
4.00
UND
2.00
4.00
8.00
CLISP
CAJA
2.00
3.00
6.00
CAJA
2.00
3.50
7.00
RESALTADOR
CAJA
1.00
25.00
25.00
CORRECTOR
UND
1.00
3.00
3.00
PARTE DIARIO
UND
20.00
20.00
400.00
OTROS
GLB
UND
1.00
450.00
450.00
UND
1.00
250.00
250.00
UND
1.00
380.00
380.00
SILLAS DE MADERA
UND
6.00
50.00
300.00
MESAS DE MADERA
UND
2.00
140.00
280.00
UND
2.00
420.00
840.00
OTROS
GLB
1.00
200.00
200.00
ALQUILER DE CAMIONETA
MES
6.00
3,500.00
21,000.00
MES
MES
6.00
500.00
3,000.00
ALQUILER DE COMPUTADORA
MES
6.00
400.00
2,400.00
GLB
1.00
1,600.00
1,600.00
2,700.00
28,000.00
MES
MES
MES
6.00
15.00
UNIT.
UND
14.01
14.03
CANT.
14.00
14.02
UNID.
12.00
COEF.
600.00
100.00
600.00
MES
TOTAL GASTOS GENERALES (10.51% CD)
271,949.02
OBRA
UBICACIN
ITEM
CODIGO
DESCRIPCION
01.00
GASTOS
GASTOS
INDIRECTOS
INDIRECTOS
PROPIOS DE OBRA ADMINISTRATIVOS
RETRIBUCIONES ECONOMICAS
INGENIERO RESIDENTE
24,000.00
ASISTENTE RESIDENTE
26,400.00
ASISTENTE ADMINISTRATIVO
MAESTRO DE OBRA
9,600.00
16,800.00
CHOFER
16,800.00
16,800.00
8,400.00
8,400.00
03.00
08.00
2,400.00
2,400.00
CASCO DE PROTECCION
60.00
60.00
95.00
95.00
95.00
-
95.00
-
CASCO DE PROTECCION
225.00
225.00
250.00
250.00
LENTES DE SEGURIDAD
150.00
150.00
180.00
180.00
60.00
60.00
450.00
450.00
GUANTES DE ASBESTO
90.00
90.00
MASCARA ANTIGAS
80.00
80.00
COMBUSTIBLE Y LUBRICANTE
8,400.00
8,400.00
GASOLINA 84 OCTANOS
520.00
520.00
ACEITES Y LUBRICANTES
900.00
900.00
29,792.00
29,792.00
39,710.52
39,710.52
MATERIALES DE CONSTRUCCION
MATERIALES DE CONSTRUCCION
BIENES DE CONSUMO
16,380.00
09.00
16,380.00
07.00
11,340.00
-
11,340.00
06.00
GUANTES DE JEBE
05.00
VESTUARIOS
04.00
12,000.00
12,000.00
12,000.00
16,800.00
02.00
26,400.00
12,000.00
GUARDIAN O CONSERGE
ENFERMERO
01.02
24,000.00
9,600.00
RESPONSABLE DE ALMACEN
01.01
TOTAL
1,200.00
1,200.00
ENSAYOS DE LABORATORIO
800.00
800.00
OBRA
UBICACIN
ITEM
CODIGO
DESCRIPCION
11.00
GASTOS
GASTOS
INDIRECTOS
INDIRECTOS
PROPIOS DE OBRA ADMINISTRATIVOS
-
ASISTENTE TECNICO
21.00
9.00
30.00
22.75
9.75
32.50
21.00
9.00
30.00
54.60
23.40
78.00
117.60
50.40
168.00
7.00
3.00
10.00
LIBRETA DE CAMPO
24.50
10.50
35.00
33.60
14.40
48.00
PAPEL CARBON
11.90
5.10
17.00
8.40
3.60
12.00
336.00
144.00
480.00
2.80
1.20
4.00
23.80
10.20
34.00
8.40
3.60
12.00
12.60
5.40
18.00
PERFORADOR GPEQUEO
7.00
3.00
10.00
SACA GRAPAS
2.80
1.20
4.00
5.60
2.40
8.00
CLISP
4.20
1.80
6.00
4.90
2.10
7.00
17.50
7.50
25.00
RESALTADOR
CORRECTOR
PARTE DIARIO
OTROS
13.00
12.00
TOTAL
2.10
0.90
3.00
280.00
120.00
400.00
450.00
450.00
250.00
250.00
380.00
380.00
SILLAS DE MADERA
300.00
300.00
MESAS DE MADERA
280.00
280.00
840.00
840.00
OTROS
200.00
200.00
21,000.00
21,000.00
-
3,000.00
3,000.00
ALQUILER DE COMPUTADORA
2,400.00
2,400.00
1,600.00
1,600.00
14.00
14.01
SERVICIO DE LUZ
14.02
14.03
600.00
600.00
258,907.57
13,041.45
271,949.02
FORMULA POLINOMICA
PROYECTO
OBRA
UBICACIN
ITEM
: FORMULA POLINOMICA
Indice
% Inicio
% Saldo
0.824
0.824
4.168
4.168
AGREGADO FINO
0.757
0.757
AGREGADO GRUESO
6.998
6.998
13
ASFALTO
0.695
0.695
17
BLOQUE Y LADRILLO
0.022
0.022
20
CEMENTO ASFALTICO
2.495
2.495
21
9.049
9.049
27
DETONANTE
0.007
0.007
28
DINAMITA
0.007
0.007
29
DOLAR
0.201
0.201
30
0.535
0.535
32
FLETE TERRESTRE
2.44
2.440
37
HERRAMIENTA MANUAL
1.005
1.005
39
10.159
10.159
43
3.653
3.653
44
0.041
0.041
45
1.948
1.948
47
20.709
20.709
48
10.098
10.098
49
21.807
21.807
53
PETROLEO DIESSEL
0.701
0.701
54
PINTURA LATEX
0.09
0.090
56
1.244
1.244
59
PLANCHA DE ASBESTO-CEMENTO
0.233
0.233
72
0.003
0.003
94
PINTURA ESMALTE
0.002
0.002
96
K=a*ACr/ACo+b*MPr/MPo+c*EQr/EQo+dGGr/GGo
0.109
0.109
100.00
100.000
OBRA
UBICACIN
ITEM
CODIGO
03.00
DESCRIPCION
COEF.
UNID.
Und.
CANT.
UNIT.
PARCIAL
TOTAL
VESTUARIO
PERSONAL
240.00
2.00
120.00
240.00
-
04.00
COMBUSTIBLES Y LUBRICANTES
Gasolina 84
Gln.
143.00
14.00
2,002.00
Aceite Multigrado
Gln.
1.00
160.00
160.00
2,162.00
06.00
SERVICIOS NO PERSONALES
Supervisor de obra
Conductor de camioneta
Mes
6.00
4,500.00
27,000.00
0.5
Mes
6.00
1,000.00
3,000.00
30,000.00
08.00
BIENES DE CONSUMO
10.00
Copias fotostticas
Und
1.00
120.00
120.00
Alquiler camioneta
0.5
Mes
6.00
3,500.00
10,500.00
10,620.00
11.00
MEDICAMENTOS
Medicamentos
Glb
1.00
148.00
148.00
148.00
-
12.00
MATERIALES DE ESCRITORIO
1
GLB
1.00
200.00
200.00
200.00
43,370.00
OBRA
UBICACIN
ITEM
Item
01.00.00
DESCRIPCION
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
OBRAS PROVISIONALES
01.01.00
01.02.00
UND
2.00
0.50
4.00
1.00
01.02.01
M2
15.30
220.00
0.07
1.00
01.02.02
TRAZO Y REPLANTEO
M2
6.00
200.00
0.03
1.00
01.02.03
M3
4.80
3.00
1.60
1.00
01.02.04
M3
6.00
6.50
0.92
1.00
01.02.05
M3
4.52
20.00
0.23
1.00
01.02.06
M3
0.45
16.00
0.03
1.00
01.02.07
M3
1.16
14.00
0.08
1.00
01.02.08
M2
12.85
12.00
1.07
1.00
01.02.09
M2
15.05
6.50
2.32
1.00
01.02.10
M2
41.60
12.00
3.47
1.00
01.02.11
M2
38.40
16.00
2.40
1.00
01.02.12
ACERO FY=4200KG/CM2
Kg
54.71
200.00
0.27
1.00
02.00.00
TRABAJOS PRELIMINARES
02.01.00
GLB
2.00
1.00
2.00
1.00
02.02.00
LIMPIEZA Y DEFORESTACION
M2
92,801.41
870.00
106.67
1.00
107
02.03.00
KM
37.24
1.70
21.91
1.00
22
02.04.00
KM
37.24
0.75
49.65
1.00
50
03.00.00
03.01.00
03.01.01
M3
738.00
1,030.00
0.72
1.00
03.01.02
M3
32.80
150.00
0.22
1.00
03.01.03
M3
126.00
400.00
0.32
1.00
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
M3
19,111.91
690.00
27.70
1.00
28
03.02.02
M3
87.70
250.00
0.35
1.00
03.02.03
M3
87.70
500.00
0.18
1.00
03.02.04
M3
1,638.50
1,030.00
1.59
1.00
03.02.05
M3
851.29
1,030.00
0.83
1.00
03.02.06
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
21,970.36
400.00
54.93
1.00
55
03.03.00
03.03.01
03.03.01.01
M2
130,381.78
3,150.00
41.39
1.00
42
03.03.01.02
M3
3,911.45
91.00
42.98
1.00
43
03.03.02
03.03.02.01
M3
17.71
575.00
0.03
1.00
03.03.02.02
M3
17.71
792.00
0.02
1.00
03.03.02.03
M3
17.71
320.00
0.06
1.00
03.03.02.04
M2
604.48
2,400.00
0.25
1.00
03.03.02.05
M3
9.07
91.00
0.10
1.00
03.03.03
03.03.03.01
M3
22,737.92
575.00
39.54
1.00
40
03.03.03.02
M3
22,737.92
792.00
28.71
1.00
29
03.03.03.03
M3
22,737.92
320.00
71.06
1.00
72
03.03.03.04
M2
126,321.78
2,820.00
44.79
1.00
45
03.03.03.05
M3
1,894.83
91.00
20.82
1.00
21
03.03.04
03.03.04.01
M3
974.40
575.00
1.69
1.00
03.03.04.02
M3
974.40
792.00
1.23
1.00
03.03.04.03
M3
974.40
320.00
3.05
1.00
03.03.04.04
M2
4,060.00
2,500.00
1.62
1.00
03.03.04.05
M3
81.20
91.00
0.89
1.00
03.04.00
03.04.01
ML
41,279.22
45.00
917.32
1.00
918
03.04.02
ML
41,279.22
600.00
68.80
1.00
69
03.04.03
LIMPIEZA DE CUNETAS
ML
5,808.00
65.00
89.35
1.00
90
03.04.04
ML
400.00
170.00
2.35
1.00
03.04.05
M2
410.00
22.00
18.64
1.00
19
OBRA
UBICACIN
ITEM
Item
03.04.06
03.05.00
DESCRIPCION
JUNTA ASFALTICA E=1"
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
148.97
80.00
1.86
1.00
03.05.01
M2
507.70
220.00
2.31
1.00
03.05.02
TRAZO Y REPLANTEO
M2
749.62
200.00
3.75
1.00
03.05.03
M3
156.68
3.00
52.23
1.00
53
03.05.04
M2
348.89
320.00
1.09
1.00
03.05.05
M3
195.85
6.50
30.13
1.00
31
03.05.06
M3
173.59
16.00
10.85
1.00
11
03.05.07
ENCOFRADO Y DESENCOFRADO
M2
1,019.00
14.00
72.79
1.00
73
03.05.08
346.00
80.00
4.33
1.00
03.05.09
ACERO FY=4200KG/CM2
Kg
2,625.82
200.00
13.13
1.00
14
ML
167.00
25.00
6.68
1.00
03.06.00
03.06.01
03.06.02
03.06.02.01
M2
284.00
220.00
1.29
1.00
03.06.02.02
M3
193.12
3.00
64.37
1.00
65
03.06.02.03
M3
241.40
6.50
37.14
1.00
38
03.06.03
03.06.03.01
M2
25.00
220.00
0.11
1.00
03.06.03.02
M3
8.00
3.00
2.67
1.00
03.06.03.03
M3
10.00
6.50
1.54
1.00
03.06.04
03.06.04.01
M2
35.00
220.00
0.16
1.00
03.06.04.02
M3
22.50
3.00
7.50
1.00
03.06.04.03
M3
28.13
6.50
4.33
1.00
03.06.05
03.06.05.01
M2
10.00
220.00
0.05
1.00
03.06.05.02
M3
13.60
3.00
4.53
1.00
03.06.05.03
M3
3.84
0.75
5.12
1.00
03.06.05.04
M3
21.80
6.50
3.35
1.00
03.06.05.05
M3
2.14
18.00
0.12
1.00
03.06.05.06
M3
1.89
16.00
0.12
1.00
03.06.05.07
M3
4.91
12.00
0.41
1.00
03.06.05.08
ENCOFRADO Y DESENCOFRADO
M2
18.00
14.00
1.29
1.00
03.06.05.09
TARRAJEO Y ACABADOS
M2
9.00
10.00
0.90
1.00
03.06.05.10
ACERO FY=4200KG/CM2
Kg
603.78
200.00
3.02
1.00
03.06.06
03.06.06.01
M2
45.00
220.00
0.20
1.00
03.06.06.02
M3
25.50
3.00
8.50
1.00
03.06.06.03
M3
19.50
0.75
26.00
1.00
26
03.06.06.04
M3
54.00
6.50
8.31
1.00
03.06.06.05
M3
42.71
18.00
2.37
1.00
03.06.06.06
M3
15.75
14.00
1.13
1.00
03.06.06.07
20.00
80.00
0.25
1.00
03.06.07
03.06.07.01
M2
58.25
220.00
0.26
1.00
03.06.07.02
M3
32.31
3.00
10.77
1.00
11
03.06.07.03
M3
40.38
6.50
6.21
1.00
03.06.07.04
M3
5.81
15.00
0.39
1.00
03.06.07.05
M3
1.82
8.00
0.23
1.00
03.06.07.06
ENCOFRADO Y DESENCOFRADO
M2
32.53
14.00
2.32
1.00
03.06.07.07
ACERO FY=4200KG/CM2
Kg
407.90
200.00
2.04
1.00
03.06.07.08
59.60
10.00
5.96
1.00
03.07.00
03.07.01
03.07.01.01
M2
931.50
220.00
4.23
1.00
03.07.01.02
TRAZO Y REPLANTEO
M2
431.94
200.00
2.16
1.00
03.07.01.03
M3
392.69
3.00
130.90
1.00
131
03.07.01.04
M3
490.87
6.50
75.52
1.00
76
03.07.01.05
M3
217.83
12.00
18.15
1.00
19
03.07.01.06
M3
36.52
18.00
2.03
1.00
OBRA
UBICACIN
ITEM
Item
DESCRIPCION
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
03.07.01.07
M3
32.62
18.00
1.81
1.00
03.07.01.08
M3
110.51
16.00
6.91
1.00
03.07.01.09
M3
31.47
12.00
2.62
1.00
03.07.01.10
ENCOFRADO Y DESENCOFRADO
M2
1,059.17
14.00
75.66
1.00
76
03.07.01.11
TARRAJEO Y ACABADOS
M2
291.07
10.00
29.11
1.00
30
03.07.01.12
ACERO FY=4200KG/CM2
Kg
7,566.68
200.00
37.83
1.00
38
03.07.02
03.07.02.01
M2
1,277.50
220.00
5.81
1.00
03.07.02.02
TRAZO Y REPLANTEO
M2
705.50
200.00
3.53
1.00
03.07.02.03
M3
690.36
3.00
230.12
1.00
231
03.07.02.04
M3
862.95
6.50
132.76
1.00
133
03.07.02.05
M3
316.20
12.00
26.35
1.00
27
03.07.02.06
M3
83.21
18.00
4.62
1.00
03.07.02.07
M3
35.45
18.00
1.97
1.00
03.07.02.08
M3
288.41
16.00
18.03
1.00
19
03.07.02.09
M3
68.42
12.00
5.70
1.00
03.07.02.10
ENCOFRADO Y DESENCOFRADO
M2
2,316.60
14.00
165.47
1.00
166
03.07.02.11
TARRAJEO Y ACABADOS
M2
599.80
10.00
59.98
1.00
60
03.07.02.12
ACERO FY=4200KG/CM2
Kg
19,449.30
200.00
97.25
1.00
98
03.07.03
03.07.03.01
M2
1,582.40
220.00
7.19
1.00
03.07.03.02
TRAZO Y REPLANTEO
M2
732.29
200.00
3.66
1.00
03.07.03.03
M3
501.83
3.00
167.28
1.00
168
03.07.03.04
M3
627.29
6.50
96.51
1.00
97
03.07.03.05
M3
263.72
12.00
21.98
1.00
22
03.07.03.06
M3
10.16
18.00
0.56
1.00
03.07.03.07
M3
59.43
18.00
3.30
1.00
03.07.03.08
M3
168.68
16.00
10.54
1.00
11
03.07.03.09
M3
73.14
12.00
6.10
1.00
03.07.03.10
ENCOFRADO Y DESENCOFRADO
M2
1,913.84
14.00
136.70
1.00
137
03.07.03.11
TARRAJEO Y ACABADOS
M2
306.16
10.00
30.62
1.00
31
03.07.03.12
ACERO FY=4200KG/CM2
Kg
10,384.95
200.00
51.92
1.00
52
03.07.04
03.07.04.01
M2
89.10
220.00
0.41
1.00
03.07.04.02
TRAZO Y REPLANTEO
M2
40.80
200.00
0.20
1.00
03.07.04.03
M3
43.50
3.00
14.50
1.00
15
03.07.04.04
M3
54.38
6.50
8.37
1.00
03.07.04.05
M3
26.00
12.00
2.17
1.00
03.07.04.06
M3
3.84
18.00
0.21
1.00
03.07.04.07
M3
3.44
18.00
0.19
1.00
03.07.04.08
M3
12.58
16.00
0.79
1.00
03.07.04.09
M3
3.65
12.00
0.30
1.00
03.07.04.10
ENCOFRADO Y DESENCOFRADO
M2
122.90
14.00
8.78
1.00
03.07.04.11
TARRAJEO Y ACABADOS
M2
34.86
10.00
3.49
1.00
03.07.04.12
ACERO FY=4200KG/CM2
Kg
1,291.49
200.00
6.46
1.00
03.07.05
03.07.05.01
M2
731.50
220.00
3.33
1.00
03.07.05.02
TRAZO Y REPLANTEO
M2
487.63
200.00
2.44
1.00
03.07.05.03
M3
447.68
3.00
149.23
1.00
150
03.07.05.04
M3
537.22
6.50
82.65
1.00
83
03.07.05.05
M3
258.26
18.00
14.35
1.00
15
03.07.05.06
M3
76.97
14.00
5.50
1.00
03.07.05.07
ENCOFRADO Y DESENCOFRADO
M2
395.17
14.00
28.23
1.00
29
115.50
80.00
1.44
1.00
03.07.05.08
03.07.06
03.07.06.01
M2
75.00
220.00
0.34
1.00
03.07.06.02
TRAZO Y REPLANTEO
M2
45.30
200.00
0.23
1.00
03.07.06.03
M3
8.33
3.00
2.78
1.00
03.07.06.04
M3
24.40
18.00
1.36
1.00
03.07.06.05
M3
47.27
12.00
3.94
1.00
03.07.07
OBRA
UBICACIN
ITEM
Item
DESCRIPCION
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
03.07.07.01
M2
32.00
220.00
0.15
1.00
03.07.07.02
TRAZO Y REPLANTEO
M2
28.00
200.00
0.14
1.00
03.07.07.03
M3
4.88
3.00
1.63
1.00
03.07.07.04
M3
16.32
12.00
1.36
1.00
03.07.07.05
M3
12.78
18.00
0.71
1.00
03.07.07.06
ENCOFRADO Y DESENCOFRADO
M2
44.93
14.00
3.21
1.00
03.07.07.07
16.40
120.00
0.14
1.00
03.08.00
03.08.01
03.08.01.01
M2
63.75
220.00
0.29
1.00
03.08.01.02
TRAZO Y REPLANTEO
M2
19.38
200.00
0.10
1.00
03.08.01.03
M3
8.75
3.00
2.92
1.00
03.08.01.04
M3
10.94
6.50
1.68
1.00
03.08.01.05
M3
9.19
18.00
0.51
1.00
03.08.01.06
M3
3.96
12.00
0.33
1.00
03.08.01.07
M2
100.50
10.00
10.05
1.00
11
03.08.01.08
ACERO FY=4200KG/CM2
Kg
265.58
200.00
1.33
1.00
03.08.01.09
M2
81.00
20.00
4.05
1.00
03.08.01.10
UND
25.00
40.00
0.63
1.00
03.08.02
03.08.02.01
M2
39.00
220.00
0.18
1.00
03.08.02.02
TRAZO Y REPLANTEO
M2
9.75
200.00
0.05
1.00
03.08.02.03
M3
6.83
3.00
2.28
1.00
03.08.02.04
M3
8.53
6.50
1.31
1.00
03.08.02.05
M3
7.17
18.00
0.40
1.00
03.08.02.06
M3
3.09
12.00
0.26
1.00
03.08.02.07
M2
78.39
10.00
7.84
1.00
03.08.02.08
ACERO FY=4200KG/CM2
Kg
414.31
200.00
2.07
1.00
03.08.02.09
M2
63.18
20.00
3.16
1.00
03.08.02.10
UND
39.00
50.00
0.78
1.00
03.08.03
03.08.03.01
M2
32.00
220.00
0.15
1.00
03.08.03.02
TRAZO Y REPLANTEO
M2
8.00
200.00
0.04
1.00
03.08.03.03
M3
5.60
3.00
1.87
1.00
03.08.03.04
M3
7.00
6.50
1.08
1.00
03.08.03.05
M3
5.88
18.00
0.33
1.00
03.08.03.06
M3
2.53
12.00
0.21
1.00
03.08.03.07
M2
64.32
10.00
6.43
1.00
03.08.03.08
ACERO FY=4200KG/CM2
Kg
339.95
200.00
1.70
1.00
03.08.03.09
M2
51.84
20.00
2.59
1.00
03.08.03.10
UND
32.00
60.00
0.53
1.00
03.08.04
03.08.04.01
M2
33.00
220.00
0.15
1.00
03.08.04.02
TRAZO Y REPLANTEO
M2
8.25
200.00
0.04
1.00
03.08.04.03
M3
4.13
3.00
1.38
1.00
03.08.04.04
M3
5.16
6.50
0.79
1.00
03.08.04.05
M3
3.45
18.00
0.19
1.00
03.08.04.06
M3
2.62
12.00
0.22
1.00
03.08.04.07
M2
25.34
10.00
2.53
1.00
03.08.04.08
ACERO FY=4200KG/CM2
Kg
114.45
200.00
0.57
1.00
03.08.04.09
M2
16.37
20.00
0.82
1.00
04.00.00
04.01.00
04.01.01
M3
2,614.20
690.00
3.79
1.00
04.01.02
M3
15.84
1,030.00
0.02
1.00
04.01.03
M2
3,645.00
3,150.00
1.16
1.00
04.01.04
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
M3
2,485.44
400.00
6.21
1.00
04.02.00
04.02.01
04.02.01.01
M3
660.96
575.00
1.15
1.00
04.02.01.02
M3
660.96
792.00
0.83
1.00
OBRA
UBICACIN
ITEM
Item
DESCRIPCION
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
04.02.01.03
M3
660.96
320.00
2.07
1.00
04.02.01.04
M2
3,672.00
2,820.00
1.30
1.00
04.02.01.05
M3
55.08
91.00
0.61
1.00
04.02.02
04.02.02.01
M2
3,672.00
2,310.00
1.59
1.00
04.02.02.02
M3
73.44
91.00
0.81
1.00
04.02.03
04.02.03.01
M2
3,685.50
5,700.00
0.65
1.00
04.02.03.02
M2
3,685.50
4,367.00
0.84
1.00
04.02.03.03
M2
3,685.50
3,818.00
0.97
1.00
04.02.03.04
M2
3,685.50
4,367.00
0.84
1.00
04.02.04
04.02.04.01
M2
270.00
4,400.00
0.06
1.00
04.02.04.02
M3
1.35
91.00
0.01
1.00
04.03.00
04.03.01
04.03.01.01
M2
45.76
220.00
0.21
1.00
04.03.01.02
TRAZO Y REPLANTEO
M2
22.36
200.00
0.11
1.00
04.03.01.03
M3
32.04
3.00
10.68
1.00
11
04.03.01.04
M2
9.24
220.00
0.04
1.00
04.03.01.05
M3
2.22
12.00
0.19
1.00
04.03.01.06
M3
24.52
12.00
2.04
1.00
04.03.01.07
M3
0.69
10.00
0.07
1.00
04.03.01.08
M3
14.84
6.50
2.28
1.00
04.03.01.09
8.19
40.00
0.20
1.00
04.03.01.10
M3
0.86
18.00
0.05
1.00
04.03.01.11
M3
3.46
18.00
0.19
1.00
04.03.01.12
M3
1.39
16.00
0.09
1.00
04.03.01.13
M3
4.17
14.00
0.30
1.00
04.03.01.14
M2
48.29
12.00
4.02
1.00
04.03.01.15
TARRAJEO Y ACABADOS
M2
18.99
10.00
1.90
1.00
04.03.01.16
ACERO FY=4200KG/CM2
Kg
328.47
200.00
1.64
1.00
04.03.02
04.03.02.01
M2
25.94
220.00
0.12
1.00
04.03.02.02
TRAZO Y REPLANTEO
M2
12.62
200.00
0.06
1.00
04.03.02.03
M3
9.43
3.00
3.14
1.00
04.03.02.04
M3
11.79
6.50
1.81
1.00
04.03.02.05
M3
1.18
18.00
0.07
1.00
04.03.02.06
M3
0.88
16.00
0.06
1.00
04.03.02.07
M2
5.44
60.00
0.09
1.00
04.03.03
04.03.03.01
ML
1,080.00
45.00
24.00
1.00
24
04.03.03.02
ML
1,080.00
600.00
1.80
1.00
04.03.03.03
ML
1,080.00
170.00
6.35
1.00
04.03.03.04
M2
420.15
22.00
19.10
1.00
20
421.20
80.00
5.27
1.00
04.03.03.05
04.03.04
04.03.04.01
PINTURA EN PAVIMENTO
M2
140.00
250.00
0.56
1.00
04.03.04.02
DELINEADORES VERTICALES
UND
56.00
25.00
2.24
1.00
04.03.04.03
TACHAS DELINEADORAS
UND
378.00
120.00
3.15
1.00
MES
6.00
1.00
6.00
1.00
UND
28.00
4.00
7.00
1.00
HA
0.95
1.00
0.95
1.00
13
05.00.00
05.01.00
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
05.01.01
SUPERVISION Y VIGILANCIA
05.02.00
PROGRAMA DE SEALIZACION
05.02.01
05.03.00
05.03.01
05.04.00
05.04.01
KM
37.24
3.00
12.41
1.00
05.04.02
M2
3,000.00
950.00
3.16
1.00
05.04.03
M3
80.00
4.00
20.00
1.00
20
OBRA
UBICACIN
ITEM
Item
DESCRIPCION
Und.
Metrado
Tiempo unitario
Rendimiento unit.
Factor
(Tu=Metrado/R
(Ru)
multiplic. (f)
u)
Duracin
(D=Tu/f)
das
05.04.04
M2
6,650.00
2,100.00
3.17
1.00
05.04.05
M3
24,455.80
2,600.00
9.41
1.00
10
GLB
1.00
1.00
1.00
1.00
05.05.00
05.05.01
06.00.00
06.01.00
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
PRUEBAS, ENSAYOS Y CONTROL DE CALIDAD
PRUEBAS DE COMPACTACION EN SUB BASE Y BASE GRANULAR
06.01.01
UND
111.00
8.00
13.88
1.00
14
06.01.02
UND
3.00
6.00
0.50
1.00
06.02.00
06.02.01
UND
5.00
4.00
1.25
1.00
06.02.02
UND
5.00
4.00
1.25
1.00
06.02.03
UND
5.00
8.00
0.63
1.00
06.03.00
06.03.01
UND
30.00
12.00
2.50
1.00
06.03.02
UND
1.00
4.00
0.25
1.00
07.00.00
07.01.00
GLB
1.00
0.50
2.00
1.00
07.02.00
HA
0.56
520.00
0.00
1.00
UND
1.00
1.00
1.00
1.00
GLB
1.00
1.00
1.00
1.00
08.00.00
08.01.00
09.00.00
09.01.00
OTROS
MURO - PLACA RECORDATORIA DE BRONCE 0.40X0.60
FLETE
FLETE TERRESTRE
OBRA
UBICACIN
ITEM
PART
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
DESCRIPCION
OBRAS PROVISIONALES
CAMPAMENTO ITINERANTES A=120M2
TRAZO Y REPLANTEO
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
12,422.78
0.00%
0.00%
0.00%
UND
2.00
4,253.97
8,507.94
4,253.97
0.00
0.00
4,253.97
0.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
2.00
50.00%
0.00%
0.00%
50.00%
0.00%
0.00%
100%
0%
3.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,914.84
M2
15.30
0.24
3.67
M2
M3
M3
M3
M3
M3
M2
M2
6.00
4.80
6.00
4.52
0.45
1.16
12.85
15.05
4.36
17.76
7.00
133.79
215.83
319.17
26.59
67.77
26.16
85.25
42.00
604.73
97.12
370.24
341.68
1,019.94
0.00
8,507.94
0%
0%
3.67
15.30
0.00
0.00
0.00
0.00
0.00
15.30
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.16
0.00
0.00
0.00
0.00
0.00
100%
0%
26.16
6.00
0.00
0.00
0.00
0.00
0.00
6.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
85.25
0.00
0.00
0.00
0.00
0.00
100%
0%
85.25
4.80
0.00
0.00
0.00
0.00
0.00
4.80
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
42.00
0.00
0.00
0.00
0.00
0.00
100%
0%
42.00
6.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
604.73
0.00
0.00
0.00
0.00
0.00
4.52
0.00
0.00
0.00
0.00
0.00
4.52
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
97.12
0.00
0.00
0.00
0.00
0.00
0%
97.12
6.00
100%
0%
604.73
0.45
0.00
0.00
0.00
0.00
0.00
0.45
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
370.24
0.00
0.00
0.00
0.00
0.00
0%
370.24
1.16
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.16
341.68
0.00
0.00
0.00
0.00
0.00
12.85
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,019.94
0.00
0.00
0.00
0.00
0.00
100%
0%
1,019.94
15.05
0.00
0.00
0.00
0.00
0.00
15.05
100%
0%
341.68
12.85
OBRA
UBICACIN
ITEM
PART
01.02.10
01.02.11
01.02.12
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
03.00.00
03.01.00
03.01.01
03.01.02
DESCRIPCION
ACERO FY=4200KG/CM2
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
LIMPIEZA Y DEFORESTACION
UNID.
MEDIDA
M2
M2
Kg
METRADO
41.60
38.40
54.71
PRECIO
UNITARIO
18.30
8.70
4.18
PARCIAL
761.28
334.08
228.69
0.00
0.00
110,858.39
GLB
2.00
17,730.00
35,460.00
M2
KM
KM
92,801.41
37.24
37.24
0.48
473.49
355.02
44,544.68
17,632.77
13,220.94
0.00
0.00
1,956,817.70
0.00
0.00
5,817.94
M3
M3
738.00
32.80
6.70
7.88
4,944.60
258.46
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
761.28
0.00
0.00
0.00
0.00
0.00
41.60
0.00
0.00
0.00
0.00
0.00
41.60
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
334.08
0.00
0.00
0.00
0.00
0.00
334.08
38.40
0.00
0.00
0.00
0.00
0.00
38.40
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
228.69
0.00
0.00
0.00
0.00
0.00
228.69
54.71
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17,730.00
0.00
0.00
0.00
0.00
17,730.00
1.00
0.00
0.00
0.00
0.00
1.00
50.00%
0.00%
0.00%
0.00%
0.00%
50.00%
13,363.40
13,363.40
13,363.40
4,454.47
0.00
0.00
100%
0%
44,544.68
27,840.42
27,840.42
27,840.42
9,280.14
0.00
0.00
92,801.41
30.00%
30.00%
30.00%
10.00%
0.00%
0.00%
10,579.66
7,053.11
0.00
0.00
0.00
0.00
100%
0%
17,632.77
TOTAL
100%
0%
761.28
54.71
100%
0%
0%
0%
35,460.00
2.00
22.34
14.90
0.00
0.00
0.00
0.00
37.24
60.00%
40.00%
0.00%
0.00%
0.00%
0.00%
100%
1,322.09
2,644.19
2,644.19
2,644.19
2,644.19
1,322.09
0%
13,220.94
3.72
7.45
7.45
7.45
7.45
3.72
37.24
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
0%
0%
0.00%
4,944.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0%
0%
4,944.60
738.00
0.00
0.00
0.00
0.00
0.00
738.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
258.46
0.00
0.00
0.00
0.00
100%
0%
258.46
0.00
32.80
0.00
0.00
0.00
0.00
32.80
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
OBRA
UBICACIN
ITEM
PART
03.01.03
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03.00
03.03.01
03.03.01.01
03.03.01.02
DESCRIPCION
MOVIMIENTO DE TIERRAS
CORTE EN MATERIAL SUELTO C/MAQUINARIA
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
UNID.
MEDIDA
M3
0
M3
M3
M3
M3
M3
M3
METRADO
126.00
PRECIO
UNITARIO
4.88
PARCIAL
614.88
0.00
0.00
187,878.69
19,111.91
3.43
65,553.85
87.70
87.70
1,638.50
851.29
21,970.36
14.56
4.88
4.70
6.70
4.88
1,276.91
427.98
7,700.95
5,703.64
107,215.36
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
614.88
0.00
0.00
0.00
0%
614.88
TOTAL
0.00
0.00
126.00
0.00
0.00
0.00
126.00
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
26,221.54
19,666.16
19,666.16
0.00
0.00
0.00
0%
0%
0%
65,553.85
7,644.76
5,733.57
5,733.57
0.00
0.00
0.00
19,111.91
40.00%
30.00%
30.00%
0.00%
0.00%
0.00%
1,276.91
0.00
0.00
0.00
0.00
0.00
100%
0%
1,276.91
87.70
0.00
0.00
0.00
0.00
0.00
87.70
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
427.98
0.00
0.00
0.00
0.00
0.00
427.98
87.70
0.00
0.00
0.00
0.00
0.00
87.70
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
3,080.38
2,310.29
2,310.29
0.00
0.00
0.00
7,700.95
655.40
491.55
491.55
0.00
0.00
0.00
1,638.50
40.00%
30.00%
30.00%
0.00%
0.00%
0.00%
2,281.46
1,711.09
1,711.09
0.00
0.00
0.00
5,703.64
340.52
255.39
255.39
0.00
0.00
0.00
851.29
40.00%
30.00%
30.00%
0.00%
0.00%
0.00%
42,886.14
32,164.61
32,164.61
0.00
0.00
0.00
100%
0%
107,215.36
8,788.14
6,591.11
6,591.11
0.00
0.00
0.00
21,970.36
40.00%
30.00%
30.00%
0.00%
0.00%
0.00%
100%
0%
0.00
0.00
639,446.88
100%
0%
0%
0.00
0.00
153,146.41
0%
130,381.78
0.91
118,647.42
M2
M3
3,911.45
8.82
34,498.99
11,864.74
23,729.48
23,729.48
23,729.48
23,729.48
11,864.74
118,647.42
13,038.18
26,076.36
26,076.36
26,076.36
26,076.36
13,038.18
130,381.78
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
3,449.90
6,899.80
6,899.80
6,899.80
6,899.80
3,449.90
34,498.99
391.15
782.29
782.29
782.29
782.29
391.15
3,911.45
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
OBRA
UBICACIN
ITEM
PART
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
03.03.03.04
03.03.03.05
DESCRIPCION
ESCARIFICADO Y COMPACTADO PAVIMENTO ANTIGUO
EXTRACCION Y APILAMIENTO RENDIMIENTO=575 M3/DIA
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
1,050.13
M3
17.71
8.57
151.77
M3
M3
M2
M3
0
M3
M3
M3
M2
M3
17.71
17.71
604.48
9.07
1.96
3.29
1.20
8.82
34.71
58.27
725.38
80.00
0.00
0.00
466,114.75
22,737.92
8.57
194,863.97
22,737.92
22,737.92
126,321.78
1,894.83
1.96
3.29
1.07
8.82
44,566.32
74,807.76
135,164.30
16,712.40
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
151.77
0.00
0.00
0.00
0.00
0.00
17.71
0.00
0.00
0.00
17.71
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
0.00
0.00
34.71
0.00
0.00
0.00
34.71
0.00
0.00
17.71
0.00
0.00
0.00
17.71
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
0.00
0.00
58.27
0.00
0.00
0.00
58.27
0.00
0.00
17.71
0.00
0.00
0.00
17.71
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
0.00
0.00
725.38
0.00
0.00
0.00
725.38
0.00
0.00
604.48
0.00
0.00
0.00
604.48
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
0.00
0.00
80.00
0.00
0.00
0.00
80.00
0.00
0.00
9.07
0.00
0.00
0.00
9.07
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
19,486.40
38,972.79
38,972.79
38,972.79
38,972.79
19,486.40
194,863.97
2,273.79
4,547.58
4,547.58
4,547.58
4,547.58
2,273.79
22,737.92
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
4,456.63
8,913.26
8,913.26
8,913.26
8,913.26
4,456.63
44,566.32
2,273.79
4,547.58
4,547.58
4,547.58
4,547.58
2,273.79
22,737.92
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
7,480.78
14,961.55
14,961.55
14,961.55
14,961.55
7,480.78
74,807.76
2,273.79
4,547.58
4,547.58
4,547.58
4,547.58
2,273.79
22,737.92
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
13,516.43
27,032.86
27,032.86
27,032.86
27,032.86
13,516.43
135,164.30
12,632.18
25,264.36
25,264.36
25,264.36
25,264.36
12,632.18
126,321.78
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
1,671.24
3,342.48
3,342.48
3,342.48
3,342.48
1,671.24
16,712.40
189.48
378.97
378.97
378.97
378.97
189.48
1,894.83
TOTAL
151.77
100%
OBRA
UBICACIN
ITEM
PART
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.03.04.05
03.04.00
03.04.01
03.04.02
03.04.03
03.04.04
DESCRIPCION
LIMPIEZA DE CUNETAS
UNID.
MEDIDA
0
M3
M3
M3
M2
M3
0
ML
ML
ML
ML
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
19,135.59
974.40
8.57
8,350.61
974.40
974.40
4,060.00
81.20
1.96
3.29
1.22
8.82
1,909.82
3,205.78
4,953.20
716.18
0.00
0.00
88,147.73
41,279.22
1.18
48,709.48
41,279.22
5,808.00
400.00
0.42
0.82
27.45
17,337.27
4,762.56
10,980.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
0.00
0.00
0.00
0.00
5,010.37
3,340.24
8,350.61
0.00
0.00
0.00
0.00
584.64
389.76
0.00%
0.00%
0.00%
0.00%
60.00%
40.00%
100%
0.00
0.00
0.00
0.00
1,145.89
763.93
1,909.82
974.40
TOTAL
974.40
0.00
0.00
0.00
0.00
584.64
389.76
0.00%
0.00%
0.00%
0.00%
60.00%
40.00%
100%
0.00
0.00
0.00
0.00
1,923.47
1,282.31
3,205.78
0.00
0.00
0.00
0.00
584.64
389.76
0.00%
0.00%
0.00%
0.00%
60.00%
40.00%
974.40
100%
0.00
0.00
0.00
0.00
2,971.92
1,981.28
4,953.20
4,060.00
0.00
0.00
0.00
0.00
2,436.00
1,624.00
0.00%
0.00%
0.00%
0.00%
60.00%
40.00%
100%
0.00
0.00
0.00
0.00
429.71
286.47
716.18
0.00
0.00
0.00
0.00
48.72
32.48
81.20
0.00%
0.00%
0.00%
0.00%
60.00%
40.00%
100%
0%
4,870.95
9,741.90
9,741.90
9,741.90
9,741.90
4,870.95
48,709.48
4,127.92
8,255.84
8,255.84
8,255.84
8,255.84
4,127.92
41,279.22
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
1,733.73
3,467.45
3,467.45
3,467.45
3,467.45
1,733.73
100%
0%
17,337.27
4,127.92
8,255.84
8,255.84
8,255.84
8,255.84
4,127.92
41,279.22
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
476.26
952.51
952.51
952.51
952.51
476.26
100%
0%
4,762.56
580.80
1,161.60
1,161.60
1,161.60
1,161.60
580.80
5,808.00
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
0%
0.00
0.00
0.00
0.00
10,980.00
0.00
10,980.00
0.00
0.00
0.00
0.00
400.00
0.00
400.00
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
03.04.05
03.04.06
03.05.00
03.05.01
03.05.02
03.05.03
03.05.04
03.05.05
03.05.06
03.05.07
03.05.08
DESCRIPCION
ENCOFRADO Y DESENCOFRADO CUNETAS
TRAZO Y REPLANTEO
ENCOFRADO Y DESENCOFRADO
UNID.
MEDIDA
M2
0
M2
M2
M3
M2
M3
M3
M2
METRADO
410.00
148.97
PRECIO
UNITARIO
13.47
5.61
PARCIAL
5,522.70
835.72
0.00
0.00
106,179.16
507.70
0.24
121.85
749.62
156.68
348.89
195.85
173.59
1,019.00
346.00
4.36
17.76
0.79
7.00
312.29
30.65
5.61
3,268.34
2,782.64
275.62
1,370.95
54,210.42
31,232.35
1,941.06
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
0.00
0.00
5,522.70
0.00
5,522.70
0.00
0.00
0.00
0.00
410.00
0.00
410.00
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
835.72
0.00
100%
0%
835.72
TOTAL
0.00
0.00
0.00
0.00
148.97
0.00
148.97
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0%
0.00
0.00
0.00
0.00
48.74
73.11
121.85
0.00
0.00
0.00
0.00
203.08
304.62
507.70
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
1,307.34
1,961.00
3,268.34
0.00
0.00
0.00
0.00
299.85
449.77
749.62
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
1,113.06
1,669.58
2,782.64
0.00
0.00
0.00
0.00
62.67
94.01
156.68
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
110.25
165.37
275.62
0.00
0.00
0.00
0.00
139.56
209.33
348.89
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
548.38
822.57
1,370.95
0.00
0.00
0.00
0.00
78.34
117.51
195.85
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
21,684.17
32,526.25
0.00
0.00
0.00
0.00
69.44
104.15
173.59
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
12,492.94
18,739.41
31,232.35
0.00
0.00
0.00
0.00
407.60
611.40
1,019.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
776.42
1,164.64
1,941.06
0.00
0.00
0.00
0.00
138.40
207.60
346.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
54,210.42
OBRA
UBICACIN
ITEM
PART
03.05.09
03.06.00
03.06.01
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.03
03.06.03.01
03.06.03.02
03.06.03.03
03.06.04
03.06.04.01
DESCRIPCION
ACERO FY=4200KG/CM2
UNID.
MEDIDA
Kg
0
ML
0
M2
M3
M3
METRADO
2,625.82
PRECIO
UNITARIO
4.18
PARCIAL
10,975.93
0.00
0.00
37,365.98
167.00
7.59
1,267.53
0.00
0.00
4,631.59
284.00
0.24
68.16
193.12
241.40
14.88
7.00
2,873.63
1,689.80
0.00
0.00
195.04
M2
25.00
0.24
6.00
M3
M3
8.00
10.00
14.88
7.00
119.04
70.00
0.00
0.00
540.11
M2
35.00
0.24
8.40
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
0.00
0.00
4,390.37
6,585.56
10,975.93
0.00
0.00
0.00
0.00
1,050.33
1,575.49
2,625.82
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
TOTAL
0%
0%
253.51
380.26
380.26
253.51
0.00
0.00
1,267.53
33.40
50.10
50.10
33.40
0.00
0.00
167.00
20.00%
30.00%
30.00%
20.00%
0.00%
0.00%
100%
0%
13.63
13.63
13.63
13.63
13.63
0.00
0%
0%
68.16
284.00
56.80
56.80
56.80
56.80
56.80
0.00
20.00%
20.00%
20.00%
20.00%
20.00%
0.00%
574.73
574.73
574.73
574.73
574.73
0.00
100%
0%
2,873.63
193.12
38.62
38.62
38.62
38.62
38.62
0.00
20.00%
20.00%
20.00%
20.00%
20.00%
0.00%
337.96
337.96
337.96
337.96
337.96
0.00
100%
0%
1,689.80
48.28
48.28
48.28
48.28
48.28
0.00
241.40
20.00%
20.00%
20.00%
20.00%
20.00%
0.00%
0.00
0.00
0.00
6.00
0.00
0.00
100%
0%
0%
0%
6.00
0.00
0.00
0.00
25.00
0.00
0.00
25.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
119.04
0.00
0.00
100%
0%
119.04
0.00
0.00
0.00
8.00
0.00
0.00
8.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
70.00
0.00
0.00
100%
0%
70.00
0.00
0.00
0.00
10.00
0.00
0.00
10.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0%
4.20
4.20
0.00
0.00
0.00
0.00
0%
0%
8.40
17.50
17.50
0.00
0.00
0.00
0.00
35.00
OBRA
UBICACIN
ITEM
PART
03.06.04.02
03.06.04.03
03.06.05
03.06.05.01
03.06.05.02
03.06.05.03
03.06.05.04
03.06.05.05
03.06.05.06
03.06.05.07
03.06.05.08
DESCRIPCION
ENCOFRADO Y DESENCOFRADO
UNID.
MEDIDA
M3
M3
METRADO
22.50
28.13
PRECIO
UNITARIO
14.88
7.00
PARCIAL
334.80
196.91
0.00
0.00
6,521.22
M2
10.00
0.24
2.40
M3
M3
M3
M3
M3
M3
M2
13.60
3.84
21.80
2.14
1.89
4.91
18.00
14.88
60.70
7.00
202.86
312.29
338.36
30.65
202.37
233.09
152.60
434.12
590.23
1,661.35
551.70
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
50.00%
50.00%
0.00%
0.00%
0.00%
0.00%
167.40
167.40
0.00
0.00
0.00
0.00
11.25
11.25
0.00
0.00
0.00
0.00
22.50
50.00%
50.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
98.46
98.46
0.00
0.00
0.00
0.00
196.91
14.07
14.07
0.00
0.00
0.00
0.00
28.13
50.00%
50.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0.48
0.48
0.48
0.48
0.24
0.24
TOTAL
100%
0%
334.80
0%
0%
2.40
2.00
2.00
2.00
2.00
1.00
1.00
10.00
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
40.47
40.47
40.47
40.47
20.24
20.24
100%
0%
202.37
2.72
2.72
2.72
2.72
1.36
1.36
13.60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
46.62
46.62
46.62
46.62
23.31
23.31
100%
0%
233.09
0.77
0.77
0.77
0.77
0.38
0.38
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
30.52
30.52
30.52
30.52
15.26
15.26
4.36
4.36
4.36
4.36
2.18
2.18
21.80
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
86.82
86.82
86.82
86.82
43.41
43.41
0%
434.12
3.84
100%
0%
152.60
0.43
0.43
0.43
0.43
0.21
0.21
2.14
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
118.05
118.05
118.05
118.05
59.02
59.02
0%
590.23
0.38
0.38
0.38
0.38
0.19
0.19
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1.89
332.27
332.27
332.27
332.27
166.14
166.14
0.98
0.98
0.98
0.98
0.49
0.49
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
110.34
110.34
110.34
110.34
55.17
55.17
100%
0%
551.70
3.60
3.60
3.60
3.60
1.80
1.80
18.00
100%
0%
1,661.35
4.91
OBRA
UBICACIN
ITEM
PART
03.06.05.09
03.06.05.10
03.06.06
03.06.06.01
03.06.06.02
03.06.06.03
03.06.06.04
03.06.06.05
03.06.06.06
03.06.06.07
03.06.07
DESCRIPCION
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
UNID.
MEDIDA
M2
Kg
METRADO
9.00
603.78
PRECIO
UNITARIO
18.84
4.18
PARCIAL
169.56
2,523.80
0.00
0.00
15,755.17
M2
45.00
0.24
10.80
M3
M3
M3
M3
M3
25.50
19.50
54.00
42.71
15.75
20.00
0.00
14.88
60.70
7.00
202.86
319.17
5.61
0.00
379.44
1,183.65
378.00
8,664.15
5,026.93
112.20
8,455.32
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
33.91
33.91
33.91
33.91
16.96
16.96
1.80
1.80
1.80
1.80
0.90
0.90
9.00
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
504.76
504.76
504.76
504.76
252.38
252.38
2,523.80
120.76
120.76
120.76
120.76
60.38
60.38
603.78
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
0.00
0.00
0.00
0.00
0.00
10.80
TOTAL
100%
0%
169.56
0%
0%
10.80
0.00
0.00
0.00
0.00
0.00
45.00
45.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
379.44
100%
0%
379.44
0.00
0.00
0.00
0.00
0.00
25.50
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
1,183.65
0.00
0.00
0.00
0.00
0.00
19.50
19.50
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
378.00
100%
0%
378.00
0.00
0.00
0.00
0.00
0.00
54.00
54.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0.00
0.00
0.00
0.00
0.00
8,664.15
0%
8,664.15
25.50
100%
0%
1,183.65
0.00
0.00
0.00
0.00
0.00
42.71
42.71
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0.00
0.00
0.00
0.00
0.00
5,026.93
0%
5,026.93
0.00
0.00
0.00
0.00
0.00
15.75
15.75
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
112.20
100%
0%
112.20
0.00
0.00
0.00
0.00
0.00
20.00
20.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0%
0%
OBRA
UBICACIN
ITEM
PART
03.06.07.01
03.06.07.02
03.06.07.03
03.06.07.04
03.06.07.05
03.06.07.06
03.06.07.07
03.06.07.08
DESCRIPCION
LIMPIEZA DE TERRENO MANUAL
ENCOFRADO Y DESENCOFRADO
ACERO FY=4200KG/CM2
UNID.
MEDIDA
M2
M3
M3
M3
M3
M2
Kg
METRADO
58.25
32.31
40.38
5.81
1.82
32.53
407.90
59.60
PRECIO
UNITARIO
0.24
17.76
7.00
239.28
351.71
30.65
4.18
47.86
PARCIAL
13.98
573.83
282.66
1,390.22
640.11
997.04
1,705.02
2,852.46
03.07.00
0.00
0.00
828,105.38
03.07.01
0.00
0.00
146,404.78
931.50
0.24
223.56
03.07.01.01
03.07.01.02
TRAZO Y REPLANTEO
M2
M2
431.94
4.36
1,883.26
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
0.00
0.00
0.00
13.98
0.00
0.00
0.00
0.00
0.00
58.25
58.25
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
573.83
100%
0%
573.83
0.00
0.00
0.00
0.00
0.00
32.31
32.31
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
282.66
100%
0%
282.66
0.00
0.00
0.00
0.00
0.00
40.38
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
1,390.22
0.00
0.00
0.00
0.00
0.00
5.81
5.81
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0.00
0.00
0.00
0.00
0.00
640.11
640.11
0.00
0.00
0.00
0.00
0.00
1.82
1.82
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0.00
0.00
0.00
0.00
0.00
997.04
997.04
0.00
0.00
0.00
0.00
0.00
32.53
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
1,705.02
0.00
0.00
0.00
0.00
0.00
407.90
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
2,852.46
TOTAL
13.98
40.38
100%
0%
1,390.22
32.53
100%
0%
1,705.02
407.90
100%
0%
2,852.46
0.00
0.00
0.00
0.00
0.00
59.60
59.60
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0%
0.00%
44.71
0.00%
44.71
0.00%
44.71
0.00%
44.71
0.00%
22.36
0.00%
22.36
0%
0%
223.56
931.50
186.30
186.30
186.30
186.30
93.15
93.15
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
376.65
376.65
376.65
376.65
188.33
188.33
1,883.26
86.39
86.39
86.39
86.39
43.19
43.19
431.94
OBRA
UBICACIN
ITEM
PART
03.07.01.03
03.07.01.04
03.07.01.05
03.07.01.06
03.07.01.07
03.07.01.08
03.07.01.09
03.07.01.10
03.07.01.11
03.07.01.12
DESCRIPCION
ENCOFRADO Y DESENCOFRADO
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
UNID.
MEDIDA
M3
M3
M3
M3
M3
M3
M3
M2
M2
Kg
METRADO
392.69
490.87
217.83
36.52
32.62
110.51
31.47
1,059.17
291.07
7,566.68
PRECIO
UNITARIO
17.76
7.00
22.17
211.00
202.86
312.29
338.36
30.65
18.84
4.18
PARCIAL
6,974.17
3,436.09
4,829.29
7,705.72
6,617.29
34,511.17
10,648.19
32,463.56
5,483.76
31,628.72
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,394.83
1,394.83
1,394.83
1,394.83
697.42
697.42
100%
0%
6,974.17
78.54
78.54
78.54
78.54
39.27
39.27
392.69
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
687.22
687.22
687.22
687.22
343.61
343.61
3,436.09
98.17
98.17
98.17
98.17
49.09
49.09
490.87
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
965.86
965.86
965.86
965.86
482.93
482.93
4,829.29
43.57
43.57
43.57
43.57
21.78
21.78
217.83
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,541.14
1,541.14
1,541.14
1,541.14
770.57
770.57
7.30
7.30
7.30
7.30
3.65
3.65
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,323.46
1,323.46
1,323.46
1,323.46
661.73
661.73
6.52
6.52
6.52
6.52
3.26
3.26
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
6,902.23
6,902.23
6,902.23
6,902.23
3,451.12
3,451.12
22.10
22.10
22.10
22.10
11.05
11.05
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
2,129.64
2,129.64
2,129.64
2,129.64
1,064.82
1,064.82
6.29
6.29
6.29
6.29
3.15
3.15
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
6,492.71
6,492.71
6,492.71
6,492.71
3,246.36
3,246.36
100%
0%
32,463.56
211.83
211.83
211.83
211.83
105.92
105.92
1,059.17
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,096.75
1,096.75
1,096.75
1,096.75
548.38
548.38
100%
0%
5,483.76
58.21
58.21
58.21
58.21
29.11
29.11
291.07
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
6,325.74
6,325.74
6,325.74
6,325.74
3,162.87
3,162.87
0%
31,628.72
1,513.34
1,513.34
1,513.34
1,513.34
756.67
756.67
7,566.68
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
TOTAL
100%
0%
7,705.72
36.52
100%
0%
6,617.29
32.62
100%
0%
34,511.17
110.51
100%
0%
10,648.19
31.47
0%
OBRA
UBICACIN
ITEM
PART
03.07.02
03.07.02.01
03.07.02.02
03.07.02.03
03.07.02.04
03.07.02.05
03.07.02.06
03.07.02.07
03.07.02.08
03.07.02.09
03.07.02.10
DESCRIPCION
ALCANTARILLA DE CONCRETO TIPO I - B (0.80x0.80) CAJON - 50 UND
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
ENCOFRADO Y DESENCOFRADO
UNID.
MEDIDA
0
M2
M2
M3
M3
M3
M3
M3
M3
M3
M2
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
330,263.11
1,277.50
0.24
306.60
705.50
690.36
862.95
316.20
83.21
35.45
288.41
68.42
2,316.60
4.36
17.76
7.00
22.17
211.00
202.86
312.29
338.36
30.65
3,075.98
12,260.79
6,040.65
7,010.15
17,557.31
7,191.39
90,067.56
23,150.59
71,003.79
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
61.32
61.32
61.32
61.32
30.66
30.66
0%
0%
306.60
255.50
255.50
255.50
255.50
127.75
127.75
1,277.50
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
615.20
615.20
615.20
615.20
307.60
307.60
3,075.98
141.10
141.10
141.10
141.10
70.55
70.55
705.50
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
2,452.16
2,452.16
2,452.16
2,452.16
1,226.08
1,226.08
12,260.79
138.07
138.07
138.07
138.07
69.04
69.04
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,208.13
1,208.13
1,208.13
1,208.13
604.07
604.07
100%
0%
6,040.65
172.59
172.59
172.59
172.59
86.30
86.30
862.95
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,402.03
1,402.03
1,402.03
1,402.03
701.02
701.02
100%
0%
7,010.15
63.24
63.24
63.24
63.24
31.62
31.62
316.20
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
3,511.46
3,511.46
3,511.46
3,511.46
1,755.73
1,755.73
16.64
16.64
16.64
16.64
8.32
8.32
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,438.28
1,438.28
1,438.28
1,438.28
719.14
719.14
7.09
7.09
7.09
7.09
3.55
3.55
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
18,013.51
18,013.51
18,013.51
18,013.51
9,006.76
9,006.76
57.68
57.68
57.68
57.68
28.84
28.84
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
4,630.12
4,630.12
4,630.12
4,630.12
2,315.06
2,315.06
13.68
13.68
13.68
13.68
6.84
6.84
68.42
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
14,200.76
14,200.76
14,200.76
14,200.76
7,100.38
7,100.38
0%
71,003.79
690.36
100%
0%
17,557.31
83.21
100%
0%
7,191.39
35.45
100%
0%
90,067.56
288.41
100%
0%
23,150.59
463.32
463.32
463.32
463.32
231.66
231.66
2,316.60
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
03.07.02.11
03.07.02.12
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.07.03.04
03.07.03.05
03.07.03.06
03.07.03.07
03.07.03.08
DESCRIPCION
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M2
Kg
0
M2
M2
M3
M3
M3
M3
M3
M3
METRADO
599.80
19,449.30
PRECIO
UNITARIO
18.84
4.18
PARCIAL
11,300.23
81,298.07
0.00
0.00
222,183.56
1,582.40
0.24
379.78
732.29
501.83
627.29
263.72
10.16
59.43
168.68
4.36
17.76
7.00
22.17
211.00
202.86
312.29
3,192.78
8,912.50
4,391.03
5,846.67
2,143.76
12,055.97
52,677.08
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
2,260.05
2,260.05
2,260.05
2,260.05
1,130.02
1,130.02
119.96
119.96
119.96
119.96
59.98
59.98
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
16,259.61
16,259.61
16,259.61
16,259.61
8,129.81
8,129.81
100%
0%
81,298.07
3,889.86
3,889.86
3,889.86
3,889.86
1,944.93
1,944.93
19,449.30
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
0%
0%
TOTAL
11,300.23
599.80
75.96
75.96
75.96
75.96
37.98
37.98
379.78
316.48
316.48
316.48
316.48
158.24
158.24
1,582.40
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
638.56
638.56
638.56
638.56
319.28
319.28
100%
0%
3,192.78
146.46
146.46
146.46
146.46
73.23
73.23
732.29
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,782.50
1,782.50
1,782.50
1,782.50
891.25
891.25
100%
0%
8,912.50
100.37
100.37
100.37
100.37
50.18
50.18
501.83
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
878.21
878.21
878.21
878.21
439.10
439.10
100%
0%
4,391.03
125.46
125.46
125.46
125.46
62.73
62.73
627.29
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,169.33
1,169.33
1,169.33
1,169.33
584.67
584.67
100%
0%
5,846.67
52.74
52.74
52.74
52.74
26.37
26.37
263.72
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
428.75
428.75
428.75
428.75
214.38
214.38
2.03
2.03
2.03
2.03
1.02
1.02
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
2,411.19
2,411.19
2,411.19
2,411.19
1,205.60
1,205.60
11.89
11.89
11.89
11.89
5.94
5.94
59.43
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
10,535.42
10,535.42
10,535.42
10,535.42
5,267.71
5,267.71
0%
52,677.08
100%
0%
2,143.76
10.16
100%
0%
12,055.97
33.74
33.74
33.74
33.74
16.87
16.87
168.68
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
03.07.03.09
03.07.03.10
03.07.03.11
03.07.03.12
03.07.04
03.07.04.01
03.07.04.02
03.07.04.03
03.07.04.04
03.07.04.05
03.07.04.06
DESCRIPCION
CONCRETO F'C=210 KG/CM2 - LOSA
ENCOFRADO Y DESENCOFRADO
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M3
M2
M2
Kg
METRADO
73.14
1,913.84
306.16
10,384.95
PRECIO
UNITARIO
338.36
30.65
18.84
4.18
PARCIAL
24,747.65
58,659.20
5,768.05
43,409.09
0.00
0.00
18,422.69
M2
89.10
0.24
21.38
M2
M3
M3
M3
M3
40.80
43.50
54.38
26.00
3.84
4.36
17.76
7.00
22.17
211.00
177.89
772.56
380.66
576.42
810.24
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
4,949.53
4,949.53
4,949.53
4,949.53
2,474.77
2,474.77
14.63
14.63
14.63
14.63
7.31
7.31
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
11,731.84
11,731.84
11,731.84
11,731.84
5,865.92
5,865.92
100%
0%
58,659.20
382.77
382.77
382.77
382.77
191.38
191.38
1,913.84
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
1,153.61
1,153.61
1,153.61
1,153.61
576.81
576.81
100%
0%
5,768.05
306.16
TOTAL
24,747.65
73.14
61.23
61.23
61.23
61.23
30.62
30.62
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
8,681.82
8,681.82
8,681.82
8,681.82
4,340.91
4,340.91
100%
0%
43,409.09
2,076.99
2,076.99
2,076.99
2,076.99
1,038.50
1,038.50
10,384.95
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
0%
0.00
0%
0%
21.38
0.00
0.00
10.69
0.00
10.69
0.00
0.00
44.55
0.00
44.55
0.00
89.10
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
88.95
0.00
88.95
0.00
100%
0%
177.89
0.00
0.00
20.40
0.00
20.40
0.00
40.80
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
386.28
0.00
386.28
0.00
100%
0%
772.56
0.00
0.00
21.75
0.00
21.75
0.00
43.50
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
190.33
0.00
190.33
0.00
100%
0%
380.66
0.00
0.00
27.19
0.00
27.19
0.00
54.38
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
288.21
0.00
288.21
0.00
100%
0%
576.42
0.00
0.00
13.00
0.00
13.00
0.00
26.00
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
100%
0.00
0.00
405.12
0.00
405.12
0.00
0%
810.24
0.00
0.00
1.92
0.00
1.92
0.00
3.84
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
03.07.04.07
03.07.04.08
03.07.04.09
03.07.04.10
03.07.04.11
03.07.04.12
03.07.05
03.07.05.01
03.07.05.02
03.07.05.03
03.07.05.04
DESCRIPCION
CONCRETO CICLOPEO f'c=140KG/CM2 + 30 % PM.
ENCOFRADO Y DESENCOFRADO
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M3
M3
M3
M2
M2
Kg
0
M2
M2
M3
M3
METRADO
3.44
12.58
3.65
122.90
34.86
1,291.49
PRECIO
UNITARIO
202.86
312.29
338.36
30.65
18.84
4.18
PARCIAL
697.84
3,928.61
1,235.01
3,766.89
656.76
5,398.43
0.00
0.00
103,730.02
731.50
0.24
175.56
487.63
447.68
537.22
4.36
17.76
7.00
2,126.07
7,950.80
3,760.54
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
348.92
0.00
348.92
0.00
0.00
0.00
1.72
0.00
1.72
0.00
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
1,964.31
0.00
1,964.31
0.00
0.00
0.00
6.29
0.00
6.29
0.00
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
617.51
0.00
617.51
0.00
0.00
0.00
1.83
0.00
1.83
0.00
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
0.00
1,883.45
0.00
1,883.45
0.00
100%
0%
3,766.89
0.00
0.00
61.45
0.00
61.45
0.00
122.90
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
100%
0%
0.00
0.00
328.38
0.00
328.38
0.00
656.76
TOTAL
697.84
3.44
100%
0%
3,928.61
12.58
100%
0%
1,235.01
3.65
0.00
0.00
17.43
0.00
17.43
0.00
34.86
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
100%
0%
0.00
0.00
2,699.22
0.00
2,699.22
0.00
5,398.43
0.00
0.00
645.75
0.00
645.75
0.00
1,291.49
0.00%
0.00%
50.00%
0.00%
50.00%
0.00%
0.00
17.56
35.11
35.11
35.11
52.67
100%
0%
0%
0%
175.56
0.00
73.15
146.30
146.30
146.30
219.45
731.50
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
0.00
212.61
425.21
425.21
425.21
637.82
100%
0%
2,126.07
0.00
48.76
97.53
97.53
97.53
146.29
487.63
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
0.00
795.08
1,590.16
1,590.16
1,590.16
2,385.24
100%
0%
7,950.80
0.00
44.77
89.54
89.54
89.54
134.30
447.68
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
100%
0.00
376.05
752.11
752.11
752.11
1,128.16
0%
3,760.54
0.00
53.72
107.44
107.44
107.44
161.17
537.22
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
03.07.05.05
03.07.05.06
03.07.05.07
03.07.05.08
DESCRIPCION
CONCRETO CICLOPEO f'c=140KG/CM2 + 30 % PM.
ENCOFRADO Y DESENCOFRADO
UNID.
MEDIDA
M3
M3
M2
METRADO
258.26
76.97
395.17
115.50
PRECIO
UNITARIO
202.86
319.17
30.65
5.61
PARCIAL
52,390.62
24,566.51
12,111.96
647.96
03.07.06
0.00
0.00
2,875.19
03.07.06.01
M2
75.00
0.24
18.00
03.07.06.02
03.07.06.03
03.07.06.04
03.07.06.05
03.07.07
03.07.07.01
TRAZO Y REPLANTEO
M2
M3
M3
M3
45.30
8.33
24.40
47.27
4.36
17.76
59.99
22.17
197.51
147.94
1,463.76
1,047.98
0.00
0.00
4,226.03
M2
32.00
0.24
7.68
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
5,239.06
10,478.12
10,478.12
10,478.12
15,717.19
0.00
25.83
51.65
51.65
51.65
77.48
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
0.00
2,456.65
4,913.30
4,913.30
4,913.30
7,369.95
TOTAL
52,390.62
258.26
100%
0%
24,566.51
0.00
7.70
15.39
15.39
15.39
23.09
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
76.97
0.00
1,211.20
2,422.39
2,422.39
2,422.39
3,633.59
0.00
39.52
79.03
79.03
79.03
118.55
395.17
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
0.00
64.80
129.59
129.59
129.59
194.39
100%
0%
647.96
100%
0%
12,111.96
0.00
11.55
23.10
23.10
23.10
34.65
115.50
0.00%
10.00%
20.00%
20.00%
20.00%
30.00%
100%
0%
0.00
0%
0%
18.00
18.00
0.00
0.00
0.00
0.00
75.00
0.00
0.00
0.00
0.00
0.00
75.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
197.51
0.00
0.00
0.00
0.00
0.00
100%
0%
197.51
45.30
0.00
0.00
0.00
0.00
0.00
45.30
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
147.94
0.00
0.00
0.00
0.00
0.00
100%
0%
147.94
8.33
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,463.76
0.00
0.00
0.00
0.00
0.00
24.40
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,047.98
0.00
0.00
0.00
0.00
0.00
47.27
0.00
0.00
0.00
0.00
0.00
47.27
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
8.33
100%
0%
1,463.76
24.40
100%
0%
1,047.98
0.00
0.00
0.00
0.00
7.68
0.00
0%
0%
0%
7.68
0.00
0.00
0.00
0.00
32.00
0.00
32.00
OBRA
UBICACIN
ITEM
PART
03.07.07.02
03.07.07.03
03.07.07.04
03.07.07.05
03.07.07.06
03.07.07.07
03.08.00
03.08.01
03.08.01.01
03.08.01.02
03.08.01.03
03.08.01.04
DESCRIPCION
TRAZO Y REPLANTEO
ENCOFRADO Y DESENCOFRADO
TRAZO Y REPLANTEO
UNID.
MEDIDA
M2
M3
M3
M3
M2
METRADO
28.00
4.88
16.32
12.78
44.93
16.40
PRECIO
UNITARIO
4.36
17.76
22.17
166.28
30.65
8.88
PARCIAL
122.08
86.67
361.81
2,125.06
1,377.10
145.63
0.00
0.00
63,875.94
0.00
0.00
20,065.30
M2
M2
M3
M3
63.75
19.38
8.75
10.94
0.24
4.36
17.76
7.00
15.30
84.50
155.40
76.58
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
122.08
0.00
0.00
0.00
0.00
0.00
28.00
0.00
28.00
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100%
0%
0.00
0.00
0.00
0.00
86.67
0.00
86.67
0.00
0.00
0.00
0.00
4.88
0.00
4.88
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100%
0%
0.00
0.00
0.00
0.00
361.81
0.00
361.81
0.00
0.00
0.00
0.00
16.32
0.00
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
2,125.06
0.00
0.00
0.00
0.00
0.00
12.78
0.00
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
1,377.10
0.00
0.00
0.00
0.00
0.00
44.93
0.00
44.93
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
145.63
0.00
100%
0%
145.63
0.00
0.00
0.00
0.00
16.40
0.00
16.40
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
100%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
6.12
9.18
0.00
0.00
0.00
0.00
25.50
38.25
63.75
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0.00
0.00
0.00
0.00
33.80
50.70
84.50
0.00
0.00
0.00
0.00
7.75
11.63
19.38
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
62.16
93.24
100%
0%
155.40
0.00
0.00
0.00
0.00
3.50
5.25
8.75
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
30.63
45.95
100%
0%
76.58
TOTAL
100%
0%
122.08
16.32
100%
0%
2,125.06
12.78
100%
0%
1,377.10
0%
0%
15.30
OBRA
UBICACIN
ITEM
PART
03.08.01.05
03.08.01.06
03.08.01.07
03.08.01.08
03.08.01.09
03.08.01.10
03.08.02
03.08.02.01
03.08.02.02
03.08.02.03
03.08.02.04
DESCRIPCION
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M3
M3
M2
Kg
M2
UND
METRADO
9.19
3.96
100.50
265.58
81.00
25.00
PRECIO
UNITARIO
202.86
328.33
47.81
4.18
8.67
398.07
PARCIAL
1,864.28
1,300.19
4,804.91
1,110.12
702.27
9,951.75
0.00
0.00
22,295.89
M2
39.00
0.24
9.36
M2
M3
M3
9.75
6.83
8.53
4.36
17.76
7.00
42.51
121.30
59.71
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
0.00
0.00
4.38
6.56
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
10.94
0.00
0.00
0.00
0.00
745.71
1,118.57
0.00
0.00
0.00
0.00
3.68
5.51
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
520.08
780.11
0.00
0.00
0.00
0.00
1.58
2.38
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
1,921.96
2,882.95
0.00
0.00
0.00
0.00
40.20
60.30
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
444.05
666.07
0%
1,110.12
265.58
100%
0%
1,864.28
9.19
100%
0%
1,300.19
3.96
100%
0%
4,804.91
100.50
0.00
0.00
0.00
0.00
106.23
159.35
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
280.91
421.36
0%
702.27
0.00
0.00
0.00
0.00
32.40
48.60
81.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
3,980.70
5,971.05
0%
9,951.75
0.00
0.00
0.00
0.00
10.00
15.00
25.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0%
0%
0.00
0.00
0.00
0.00
3.74
5.62
9.36
0.00
0.00
0.00
0.00
15.60
23.40
39.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0.00
0.00
0.00
0.00
17.00
25.51
42.51
0.00
0.00
0.00
0.00
3.90
5.85
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
48.52
72.78
0.00
0.00
0.00
0.00
2.73
4.10
6.83
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
23.88
35.83
100%
0%
59.71
9.75
100%
0%
121.30
OBRA
UBICACIN
ITEM
PART
03.08.02.05
03.08.02.06
03.08.02.07
03.08.02.08
03.08.02.09
03.08.02.10
03.08.03
03.08.03.01
03.08.03.02
03.08.03.03
03.08.03.04
DESCRIPCION
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M3
M3
M2
Kg
M2
UND
METRADO
7.17
3.09
78.39
414.31
63.18
39.00
PRECIO
UNITARIO
202.86
328.33
47.81
4.18
8.67
347.86
PARCIAL
1,454.51
1,014.54
3,747.83
1,731.82
547.77
13,566.54
0.00
0.00
17,561.69
M2
32.00
0.24
7.68
M2
M3
M3
8.00
5.60
7.00
4.36
17.76
7.00
34.88
99.46
49.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
0.00
0.00
3.41
5.12
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
8.53
0.00
0.00
0.00
0.00
581.80
872.71
0.00
0.00
0.00
0.00
2.87
4.30
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
405.82
608.72
0.00
0.00
0.00
0.00
1.24
1.85
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
1,499.13
2,248.70
0.00
0.00
0.00
0.00
31.36
47.03
78.39
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
692.73
1,039.09
0%
1,731.82
100%
0%
1,454.51
7.17
100%
0%
1,014.54
3.09
100%
0%
3,747.83
0.00
0.00
0.00
0.00
165.72
248.59
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
414.31
100%
0.00
0.00
0.00
0.00
219.11
328.66
0%
547.77
0.00
0.00
0.00
0.00
25.27
37.91
63.18
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
5,426.62
8,139.92
0%
13,566.54
0.00
0.00
0.00
0.00
15.60
23.40
39.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0%
0%
0.00
0.00
0.00
0.00
3.07
4.61
7.68
0.00
0.00
0.00
0.00
12.80
19.20
32.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0.00
0.00
0.00
0.00
13.95
20.93
34.88
0.00
0.00
0.00
0.00
3.20
4.80
8.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
39.78
59.68
100%
0%
99.46
0.00
0.00
0.00
0.00
2.24
3.36
5.60
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
19.60
29.40
100%
0%
49.00
OBRA
UBICACIN
ITEM
PART
03.08.03.05
03.08.03.06
03.08.03.07
03.08.03.08
03.08.03.09
03.08.03.10
03.08.04
03.08.04.01
03.08.04.02
03.08.04.03
03.08.04.04
DESCRIPCION
ACERO FY=4200KG/CM2
TRAZO Y REPLANTEO
UNID.
MEDIDA
M3
M3
M2
Kg
M2
UND
METRADO
5.88
2.53
64.32
339.95
51.84
32.00
PRECIO
UNITARIO
202.86
328.33
47.81
4.18
8.67
325.05
PARCIAL
1,192.82
830.67
3,075.14
1,420.99
449.45
10,401.60
0.00
0.00
3,953.06
M2
33.00
0.24
7.92
M2
M3
M3
8.25
4.13
5.16
4.36
17.76
7.00
35.97
73.35
36.12
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
0.00
0.00
2.80
4.20
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
7.00
0.00
0.00
0.00
0.00
477.13
715.69
0.00
0.00
0.00
0.00
2.35
3.53
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
332.27
498.40
0.00
0.00
0.00
0.00
1.01
1.52
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
1,230.06
1,845.08
0.00
0.00
0.00
0.00
25.73
38.59
64.32
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
568.40
852.59
0%
1,420.99
339.95
100%
0%
1,192.82
5.88
100%
0%
830.67
2.53
100%
0%
3,075.14
0.00
0.00
0.00
0.00
135.98
203.97
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
179.78
269.67
0%
449.45
0.00
0.00
0.00
0.00
20.74
31.10
51.84
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
4,160.64
6,240.96
0%
10,401.60
0.00
0.00
0.00
0.00
12.80
19.20
32.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0%
0%
0.00
0.00
0.00
0.00
3.17
4.75
7.92
0.00
0.00
0.00
0.00
13.20
19.80
33.00
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0.00
0.00
0.00
0.00
14.39
21.58
35.97
0.00
0.00
0.00
0.00
3.30
4.95
8.25
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
29.34
44.01
100%
0%
73.35
0.00
0.00
0.00
0.00
1.65
2.48
4.13
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
14.45
21.67
100%
0%
36.12
OBRA
UBICACIN
ITEM
PART
03.08.04.05
03.08.04.06
03.08.04.07
03.08.04.08
03.08.04.09
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
DESCRIPCION
ACERO FY=4200KG/CM2
ELIMINACIN DE MAT. EXEDENTE AL DME (80% DEL CORTE MX. 1.5 KM.)
UNID.
MEDIDA
M3
M3
M2
Kg
M2
METRADO
3.45
2.62
25.34
114.45
16.37
PRECIO
UNITARIO
202.86
328.33
47.81
4.18
33.58
PARCIAL
699.87
860.22
1,211.51
478.40
549.70
0.00
0.00
323,424.74
0.00
0.00
24,487.06
M3
M3
M2
M3
2,614.20
15.84
3,645.00
2,485.44
3.43
4.70
0.91
4.88
8,966.71
74.45
3,316.95
12,128.95
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
0.00
0.00
2.06
3.10
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
5.16
0.00
0.00
0.00
0.00
279.95
419.92
0.00
0.00
0.00
0.00
1.38
2.07
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
344.09
516.13
0.00
0.00
0.00
0.00
1.05
1.57
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
0.00
0.00
0.00
0.00
484.60
726.91
0.00
0.00
0.00
0.00
10.14
15.20
25.34
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
191.36
287.04
0%
478.40
114.45
100%
0%
699.87
3.45
100%
0%
860.22
2.62
100%
0%
1,211.51
0.00
0.00
0.00
0.00
45.78
68.67
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0.00
0.00
0.00
0.00
219.88
329.82
0%
549.70
0.00
0.00
0.00
0.00
6.55
9.82
16.37
0.00%
0.00%
0.00%
0.00%
40.00%
60.00%
100%
0%
0%
0.00%
0.00
0.00%
8,966.71
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0%
0%
8,966.71
2,614.20
0.00
2,614.20
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
74.45
0.00
0.00
0.00
0.00
0.00
15.84
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
1,990.17
1,326.78
0.00
0.00
0.00
100%
0%
3,316.95
0.00
2,187.00
1,458.00
0.00
0.00
0.00
3,645.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
0.00
0.00
12,128.95
0.00
0.00
0.00
0%
12,128.95
2,485.44
0.00
0.00
2,485.44
0.00
0.00
0.00
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100%
0%
74.45
15.84
100%
100%
0%
OBRA
UBICACIN
ITEM
PART
04.02.00
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.02
04.02.02.01
04.02.02.02
04.02.03
04.02.03.01
04.02.03.02
DESCRIPCION
PAVIMENTO FLEXIBLE CON CARPERTA ASFLTICA EN CALIENTE E=0.05M
CONFORMACION DE SUB BASE E=0.15M
EXTRACCION Y APILAMIENTO RENDIMIENTO=575 M3/DIA
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
238,135.92
0.00
0.00
13,549.32
660.96
8.57
5,664.43
M3
M3
M3
M2
M3
0
M2
M3
0
M2
M2
660.96
660.96
3,672.00
55.08
1.96
3.29
1.07
8.82
1,295.48
2,174.56
3,929.04
485.81
0.00
0.00
69,203.98
3,672.00
18.67
68,556.24
73.44
8.82
647.74
0.00
0.00
153,980.21
3,685.50
6.17
22,739.54
3,685.50
33.85
124,754.18
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0%
0%
0.00
3,398.66
2,265.77
0.00
0.00
0.00
5,664.43
660.96
0.00
396.58
264.38
0.00
0.00
0.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
0.00
777.29
518.19
0.00
0.00
0.00
1,295.48
660.96
100%
0.00
396.58
264.38
0.00
0.00
0.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
0.00
1,304.74
869.82
0.00
0.00
0.00
2,174.56
660.96
100%
0.00
396.58
264.38
0.00
0.00
0.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
0.00
2,357.42
1,571.62
0.00
0.00
0.00
3,929.04
3,672.00
100%
0.00
2,203.20
1,468.80
0.00
0.00
0.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
100%
0.00
291.49
194.32
0.00
0.00
0.00
485.81
0.00
33.05
22.03
0.00
0.00
0.00
55.08
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
100%
0.00
41,133.74
27,422.50
0.00
0.00
0.00
68,556.24
0.00
2,203.20
1,468.80
0.00
0.00
0.00
3,672.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
100%
0.00
388.64
259.10
0.00
0.00
0.00
647.74
0.00
44.06
29.38
0.00
0.00
0.00
73.44
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
100%
0.00
0.00
22,739.54
0.00
0.00
0.00
22,739.54
0.00
0.00
3,685.50
0.00
0.00
0.00
3,685.50
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
49,901.67
74,852.51
0.00
0.00
124,754.18
0.00
0.00
1,474.20
2,211.30
0.00
0.00
3,685.50
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
100%
100%
OBRA
UBICACIN
ITEM
PART
04.02.03.03
04.02.03.04
04.02.04
04.02.04.01
04.02.04.02
DESCRIPCION
UNID.
MEDIDA
M2
M2
0
M2
M3
METRADO
3,685.50
3,685.50
PRECIO
UNITARIO
0.27
1.49
PARCIAL
995.09
5,491.40
0.00
0.00
1,402.41
270.00
5.15
1,390.50
1.35
8.82
11.91
04.03.00
0.00
0.00
60,801.76
04.03.01
0.00
0.00
10,473.61
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
TRAZO Y REPLANTEO
M2
M2
M3
M2
M3
45.76
22.36
32.04
9.24
2.22
0.24
4.36
17.76
0.78
80.23
10.98
97.49
569.03
7.21
178.11
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
398.04
597.05
0.00
0.00
995.09
0.00
0.00
1,474.20
2,211.30
0.00
0.00
3,685.50
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
0.00
0.00
2,196.56
3,294.84
0.00
0.00
5,491.40
0.00
0.00
1,474.20
2,211.30
0.00
0.00
3,685.50
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
0.00
0.00
0.00
1,390.50
0.00
0.00
1,390.50
0.00
0.00
0.00
270.00
0.00
0.00
270.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0.00
0.00
0.00
11.91
0.00
0.00
11.91
0.00
0.00
0.00
1.35
0.00
0.00
1.35
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
TOTAL
100%
100%
0%
0%
0.00%
0.00
0.00%
10.98
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0%
10.98
0.00
45.76
0.00
0.00
0.00
0.00
45.76
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
97.49
0.00
0.00
0.00
0.00
100%
0%
97.49
0.00
22.36
0.00
0.00
0.00
0.00
22.36
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
569.03
0.00
0.00
0.00
0.00
100%
0%
569.03
0.00
32.04
0.00
0.00
0.00
0.00
32.04
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
7.21
0.00
0.00
0.00
0.00
100%
0%
7.21
0.00
9.24
0.00
0.00
0.00
0.00
9.24
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0.00
178.11
0.00
0.00
0.00
0.00
178.11
0.00
2.22
0.00
0.00
0.00
0.00
2.22
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
04.03.01.06
04.03.01.07
04.03.01.08
04.03.01.09
04.03.01.10
04.03.01.11
04.03.01.12
04.03.01.13
04.03.01.14
04.03.01.15
04.03.01.16
DESCRIPCION
RELLENO COMPACTADO CON MATERIAL SELECCIONADO
TARRAJEO Y ACABADOS
ACERO FY=4200KG/CM2
UNID.
MEDIDA
M3
M3
M3
M3
M3
M3
M3
M2
M2
Kg
METRADO
24.52
0.69
14.84
8.19
0.86
3.46
1.39
4.17
48.29
18.99
328.47
PRECIO
UNITARIO
22.17
5.33
7.00
338.76
211.00
202.86
265.03
319.17
38.76
18.84
4.18
PARCIAL
543.61
3.68
103.88
2,774.44
181.46
701.90
368.39
1,330.94
1,871.72
357.77
1,373.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
543.61
0.00
0.00
0.00
0.00
0.00
24.52
0.00
0.00
0.00
0.00
24.52
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
3.68
0.00
0.00
0.00
0.00
100%
0%
3.68
0.00
0.69
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
103.88
0.00
0.00
0.00
0.00
0.00
14.84
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
2,774.44
0.00
0.00
0.00
0.00
0.00
8.19
0.00
0.00
0.00
0.00
8.19
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0.00
181.46
0.00
0.00
0.00
0.00
181.46
0.00
0.86
0.00
0.00
0.00
0.00
0.86
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0.00
701.90
0.00
0.00
0.00
0.00
701.90
0.00
3.46
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
368.39
0.00
0.00
0.00
0.00
0.00
1.39
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
1,330.94
0.00
0.00
0.00
0.00
0.00
4.17
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
1,871.72
0.00
0.00
0.00
0.00
0.00
48.29
0.00
0.00
0.00
0.00
48.29
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
357.77
0.00
0.00
0.00
0.00
100%
0%
357.77
0.00
18.99
0.00
0.00
0.00
0.00
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
1,373.00
0.00
0.00
0.00
0.00
TOTAL
543.61
0.69
100%
0%
103.88
14.84
100%
0%
2,774.44
3.46
100%
0%
368.39
1.39
100%
0%
1,330.94
4.17
100%
0%
1,871.72
18.99
100%
0%
1,373.00
OBRA
UBICACIN
ITEM
PART
04.03.02
04.03.02.01
04.03.02.02
04.03.02.03
04.03.02.04
04.03.02.05
04.03.02.06
04.03.02.07
04.03.03
04.03.03.01
04.03.03.02
DESCRIPCION
TRAZO Y REPLANTEO
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
826.18
M2
25.94
0.24
6.23
M2
M3
M3
M3
M3
M2
0
ML
ML
12.62
9.43
11.79
1.18
0.88
5.44
4.36
17.76
7.00
202.86
265.03
7.78
55.02
167.48
82.53
239.37
233.23
42.32
0.00
0.00
39,396.35
1,080.00
1.18
1,274.40
1,080.00
0.42
453.60
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
328.47
0.00
0.00
0.00
0.00
328.47
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0%
0.00
0.00
0.00
6.23
0.00
0.00
0%
6.23
0.00
0.00
0.00
25.94
0.00
0.00
25.94
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0.00
0.00
0.00
55.02
0.00
0.00
0%
55.02
0.00
0.00
0.00
12.62
0.00
0.00
12.62
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0.00
0.00
0.00
167.48
0.00
0.00
0%
167.48
0.00
0.00
0.00
9.43
0.00
0.00
9.43
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
82.53
0.00
0.00
100%
0%
82.53
0.00
0.00
0.00
11.79
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
239.37
0.00
0.00
0.00
0.00
0.00
1.18
0.00
0.00
1.18
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0%
0.00
0.00
0.00
233.23
0.00
0.00
233.23
0.00
0.00
0.00
0.88
0.00
0.00
0.88
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0%
0.00
0.00
0.00
42.32
0.00
0.00
42.32
0.00
0.00
0.00
5.44
0.00
0.00
5.44
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100%
0%
11.79
100%
0%
239.37
0.00
0.00
764.64
509.76
0.00
0.00
0%
0%
1,274.40
0.00
0.00
648.00
432.00
0.00
0.00
1,080.00
0.00%
0.00%
60.00%
40.00%
0.00%
0.00%
0.00
0.00
272.16
181.44
0.00
0.00
100%
0%
453.60
0.00
0.00
648.00
432.00
0.00
0.00
1,080.00
0.00%
0.00%
60.00%
40.00%
0.00%
0.00%
100%
OBRA
UBICACIN
ITEM
PART
04.03.03.03
04.03.03.04
04.03.03.05
04.03.04
04.03.04.01
04.03.04.02
04.03.04.03
05.00.00
05.01.00
05.01.01
05.02.00
05.02.01
05.03.00
05.03.01
DESCRIPCION
DELINEADORES VERTICALES
TACHAS DELINEADORAS
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
SUPERVISION Y VIGILANCIA
PROGRAMA DE SEALIZACION
COLOCACION DE SEALES INFORMATIVAS - AMBIENTALES
PROGRAMA DE REFORESTACION
INSTALACION DE PLANTONES EN ZONAS PREVISTAS
UNID.
MEDIDA
ML
M2
0
M2
UND
UND
METRADO
1,080.00
420.15
421.20
PRECIO
UNITARIO
27.45
13.47
5.61
PARCIAL
29,646.00
5,659.42
2,362.93
0.00
0.00
10,105.62
140.00
16.90
2,366.00
56.00
378.00
73.34
9.61
4,107.04
3,632.58
0.00
0.00
84,424.91
0.00
0.00
24,000.00
MES
6.00
4,000.00
24,000.00
0.00
0.00
5,768.56
UND
28.00
206.02
5,768.56
0.00
0.00
4,278.04
HA
0.95
4,503.20
4,278.04
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
0.00
0.00
17,787.60
11,858.40
0.00
0.00
0%
29,646.00
1,080.00
TOTAL
0.00
0.00
648.00
432.00
0.00
0.00
0.00%
0.00%
60.00%
40.00%
0.00%
0.00%
0.00
0.00
3,395.65
2,263.77
0.00
0.00
0%
5,659.42
100%
0.00
0.00
252.09
168.06
0.00
0.00
420.15
0.00%
0.00%
60.00%
40.00%
0.00%
0.00%
100%
0.00
0.00
1,417.76
945.17
0.00
0.00
0%
2,362.93
0.00
0.00
252.72
168.48
0.00
0.00
421.20
0.00%
0.00%
60.00%
40.00%
0.00%
0.00%
100%
0%
0%
0%
0.00
0.00
0.00
0.00
0.00
2,366.00
0.00
0.00
0.00
0.00
0.00
140.00
140.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0.00
0.00
0.00
0.00
0.00
4,107.04
4,107.04
0.00
0.00
0.00
0.00
0.00
56.00
56.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0.00
0.00
0.00
0.00
0.00
3,632.58
3,632.58
0.00
0.00
0.00
0.00
0.00
378.00
378.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0%
0.00%
4,000.00
0.00%
4,000.00
0.00%
4,000.00
0.00%
4,000.00
0.00%
4,000.00
0.00%
4,000.00
1.00
1.00
1.00
1.00
1.00
1.00
16.67%
16.67%
16.67%
16.67%
16.67%
16.67%
5,768.56
0.00
0.00
0.00
0.00
0.00
28.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
4,278.04
2,366.00
0%
0%
24,000.00
6.00
100%
0%
0%
0%
5,768.56
28.00
100%
0%
0%
0%
4,278.04
OBRA
UBICACIN
ITEM
PART
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.05.00
05.05.01
06.00.00
06.01.00
06.01.01
06.01.02
DESCRIPCION
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
46,878.31
KM
37.24
333.64
12,424.75
M2
M3
M2
M3
3,000.00
80.00
6,650.00
24,455.80
1.14
30.23
1.03
0.89
3,420.00
2,418.40
6,849.50
21,765.66
0.00
0.00
3,500.00
GLB
1.00
3,500.00
3,500.00
0.00
0.00
9,927.66
0.00
0.00
6,896.43
UND
UND
111.00
3.00
60.36
65.49
6,699.96
196.47
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0.00
0.00
0.00
0.00
0.00
0.95
0.95
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0%
0.00
0.00
0.00
0.00
0.00
12,424.75
0%
12,424.75
0.00
0.00
0.00
0.00
0.00
37.24
37.24
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0.00
0.00
1,710.00
0.00
0.00
1,710.00
0%
3,420.00
0.00
0.00
1,500.00
0.00
0.00
1,500.00
3,000.00
0.00%
0.00%
50.00%
0.00%
0.00%
50.00%
100%
0.00
0.00
1,209.20
0.00
0.00
1,209.20
0%
2,418.40
0.00
0.00
40.00
0.00
0.00
40.00
0.00%
0.00%
50.00%
0.00%
0.00%
50.00%
0.00
0.00
0.00
0.00
0.00
6,849.50
100%
0%
6,849.50
0.00
0.00
0.00
0.00
0.00
6,650.00
6,650.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
21,765.66
100%
0%
21,765.66
0.00
0.00
0.00
0.00
0.00
24,455.80
24,455.80
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0.00
80.00
0%
0%
3,500.00
3,500.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
0%
0%
0.00%
670.00
0.00%
1,339.99
0.00%
1,339.99
0.00%
1,339.99
0.00%
1,339.99
0.00%
670.00
0%
0%
6,699.96
11.10
22.20
22.20
22.20
22.20
11.10
111.00
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
100%
0%
0.00
117.88
78.59
0.00
0.00
0.00
196.47
0.00
1.80
1.20
0.00
0.00
0.00
3.00
0.00%
60.00%
40.00%
0.00%
0.00%
0.00%
100%
0%
OBRA
UBICACIN
ITEM
PART
06.02.00
06.02.01
06.02.02
06.02.03
06.03.00
06.03.01
06.03.02
DESCRIPCION
PRUEBAS A LA CALIDAD DE LA MEZCLA Y CARPETA ASFALTICA
ENSAYO DE DENSIDAD DE LAS PROBETAS DE REFERENCIA, DE DENSIDAD DE LA MEZCLA
ASFLTICA COMPACTADA IN SITU.
UNID.
MEDIDA
METRADO
PRECIO
UNITARIO
PARCIAL
0.00
0.00
1,584.00
UND
5.00
160.72
803.60
UND
UND
5.00
5.00
90.72
65.36
453.60
326.80
0.00
0.00
1,447.23
UND
30.00
40.24
1,207.20
UND
1.00
240.03
240.03
07.00.00
0.00
0.00
56,804.00
07.01.00
GLB
1.00
4,500.00
4,500.00
07.02.00
08.00.00
08.01.00
09.00.00
OTROS
MURO - PLACA RECORDATORIA DE BRONCE 0.40X0.60
FLETE
HA
0.56
93,400.00
52,304.00
0.00
0.00
990.80
UND
1.00
990.80
990.80
0.00
0.00
32,796.77
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
TOTAL
0%
0%
0.00
0.00
321.44
482.16
0.00
0.00
803.60
0.00
0.00
2.00
3.00
0.00
0.00
5.00
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
100%
0%
0.00
0.00
181.44
272.16
0.00
0.00
453.60
0.00
0.00
2.00
3.00
0.00
0.00
5.00
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
100%
0%
0.00
0.00
130.72
196.08
0.00
0.00
326.80
0.00
0.00
2.00
3.00
0.00
0.00
5.00
0.00%
0.00%
40.00%
60.00%
0.00%
0.00%
100%
0%
0%
0%
120.72
241.44
241.44
241.44
241.44
120.72
1,207.20
3.00
6.00
6.00
6.00
6.00
3.00
30.00
10.00%
20.00%
20.00%
20.00%
20.00%
10.00%
240.03
0.00
0.00
0.00
0.00
0.00
100%
0%
240.03
1.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
4,500.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
52,304.00
0.00
0.00
0.00
0.00
0.00
1.00
100%
0%
0%
0%
4,500.00
0%
52,304.00
0.56
0.00
0.00
0.00
0.00
0.00
0.56
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
990.80
0%
0%
0%
990.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100%
0%
0%
OBRA
UBICACIN
ITEM
PART
09.01.00
DESCRIPCION
FLETE TERRESTRE
UNID.
MEDIDA
GLB
METRADO
1.00
PRECIO
UNITARIO
32,796.77
PARCIAL
32,796.77
2,588,467.75
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
6,559.35
6,559.35
6,559.35
6,559.35
3,279.68
3,279.68
TOTAL
0%
32,796.77
0.20
0.20
0.20
0.20
0.10
0.10
1.00
20.00%
20.00%
20.00%
20.00%
10.00%
10.00%
100%
67,176.13
228,786.86
302,574.32
276,643.17
392,150.80
728,548.32
1,995,879.60
271,949.02
7,057.64
24,036.75
31,789.00
29,064.62
41,200.06
76,542.58
209,690.66
43,370.00
1,125.54
3,833.34
5,069.66
4,635.18
6,570.52
12,206.89
33,441.13
2,903,786.77
75,359.32
256,656.95
339,432.98
310,342.98
439,921.38
817,297.79
2,239,011.39
75,359.32
256,656.95
339,432.98
310,342.98
439,921.38
817,297.79
2,239,011.39
2.60%
8.84%
11.69%
10.69%
15.15%
28.15%
77.11%
OBRA
UBICACIN
ITEM
PART
01.00.00
02.00.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.06.01
03.06.02
DESCRIPCION
OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
UNID.
MEDIDA
GLB
GLB
METRADO
1.00
1.00
12,422.78
110,858.39
0.00
1,956,817.70
GLB
1.00
5,817.94
M3
M2
ML
ML
0
M2
UND
19,199.61
130,381.78
47,087.22
210.00
187,878.69
639,446.88
88,147.73
106,179.16
0.00
37,365.98
130,381.78
1,267.53
71.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
PRESUPUESTO
4,631.59
TOTAL
2,126.99
1,276.19
4,463.62
2,854.40
650.00
301.58
11,672.78
0.17
0.10
0.36
0.23
0.05
0.02
0.94
17.12%
10.27%
35.93%
22.98%
5.23%
2.43%
16,012.39
23,578.05
40,009.25
7,174.97
6,270.00
12,048.35
105,093.01
0.14
0.21
0.36
0.06
0.06
0.11
0.95
14.44%
21.27%
36.09%
6.47%
5.66%
10.87%
112.60
1,203.96
2,390.88
1,440.50
280.00
0.00
5,427.94
0.02
0.21
0.41
0.25
0.05
0.00
0.93
1.94%
20.69%
41.09%
24.76%
4.81%
0.00%
36,149.52
66,939.70
86,623.01
6,934.08
2,000.00
0.00
198,646.31
3,694.17
6,840.67
8,852.14
708.60
204.38
0.00
20,299.97
19.24%
35.63%
46.11%
3.69%
1.06%
0.00%
0.00
57,234.72
65,597.77
68,340.22
137,776.20
153,403.85
482,352.76
98,350.64
94%
95%
93%
106%
0.00
11,670.03
13,375.24
13,934.42
28,092.26
31,278.70
0.00%
8.95%
10.26%
10.69%
21.55%
23.99%
0.00
20,514.16
15,421.42
15,813.60
6,353.38
23,691.80
81,794.36
0.00
10,958.36
8,237.89
8,447.39
3,393.88
12,655.81
43,693.34
0.00%
23.27%
17.49%
17.94%
7.21%
26.88%
0.00
0.00
0.00
0.00
0.00
53,089.59
53,089.59
0.00
0.00
0.00
0.00
0.00
105.00
105.00
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
0.00
0.00
759.00
508.53
0.00
0.00
1,267.53
0.00
0.00
78,072.92
52,308.86
0.00
0.00
130,381.78
0.00%
0.00%
59.88%
40.12%
0.00%
0.00%
0.00
0.00
0.00
2,152.71
0.00
0.00
2,152.71
0.00
0.00
0.00
33.00
0.00
0.00
33.00
0.00%
0.00%
0.00%
46.48%
0.00%
0.00%
75%
93%
50%
100%
46%
OBRA
UBICACIN
ITEM
PART
03.06.03
03.06.04
03.06.05
03.06.06
03.06.07
DESCRIPCION
LIMPIEZA Y DESCOLMATACION DE BADENES (01 UND)
UNID.
MEDIDA
UND
UND
UND
UND
UND
METRADO
1.00
1.00
5.00
1.00
6.00
195.04
540.11
6,521.22
15,755.17
8,455.32
03.07.00
0.00
828,105.38
03.07.01
UND
23.00
146,404.78
03.07.02
03.07.03
03.07.04
03.07.05
UND
UND
UND
UND
50.00
86.00
2.00
9.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
PRESUPUESTO
330,263.11
222,183.56
18,422.69
103,730.02
TOTAL
0.00
0.00
0.00
195.04
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
284.40
0.00
284.40
0.00
0.00
0.00
0.00
0.53
0.00
0.53
0.00%
0.00%
0.00%
0.00%
52.66%
0.00%
0.00
0.00
0.00
0.00
0.00
3,266.02
3,266.02
2.50
195.04
1.00
100%
53%
0.00
0.00
0.00
0.00
0.00
2.50
0.00%
0.00%
0.00%
0.00%
0.00%
50.08%
0.00
0.00
0.00
15,755.17
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
2,487.25
47,972.52
47,972.50
98,432.27
0.00
0.00
0.00
0.39
7.54
7.54
15.46
0.00%
0.00%
0.00%
1.70%
32.77%
32.77%
867.29
6,168.37
46,214.77
58,985.25
72,675.81
72,675.81
257,587.30
0.13
0.93
7.00
8.93
11.00
11.00
39.00
0.26%
1.87%
13.99%
17.86%
22.01%
22.01%
0.00
5,166.34
15,499.03
51,663.42
49,951.59
49,951.59
172,231.96
0.00
2.00
6.00
20.00
19.33
19.33
66.67
0.00%
2.33%
6.98%
23.25%
22.48%
22.48%
676.24
8,536.81
9,209.63
0.00
0.00
0.00
0.07
0.93
1.00
0.00
0.00
0.00
3.67%
46.34%
49.99%
0.00%
0.00%
0.00%
1,104.00
34,178.65
11,369.99
0.00
30,420.54
0.00
77,073.18
0.10
2.97
0.99
0.00
2.64
0.00
6.69
50%
15,755.17
1.00
100%
0%
67%
78%
78%
18,422.68
2.00
100%
OBRA
UBICACIN
ITEM
PART
03.07.06
03.07.07
03.08.00
03.08.01
03.08.02
03.08.03
03.08.04
04.00.00
04.01.00
04.02.00
DESCRIPCION
UNID.
MEDIDA
ML
ML
METRADO
35.50
24.00
2,875.19
4,226.03
0.00
63,875.94
UND
25.00
20,065.30
UND
UND
UND
0
M3
M2
39.00
32.00
33.00
22,295.89
17,561.69
3,953.06
0.00
323,424.74
2,614.20
24,487.06
3,615.30
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
PRESUPUESTO
238,135.92
04.03.00
0.00
60,801.76
04.03.01
UND
1.00
10,473.61
TOTAL
1.06%
32.95%
10.96%
0.00%
29.33%
0.00%
74%
1,733.09
487.74
0.00
654.36
0.00
0.00
2,875.19
21.40
6.02
0.00
8.08
0.00
0.00
35.50
60.28%
16.96%
0.00%
22.76%
0.00%
0.00%
194.80
3,502.16
529.09
0.00
0.00
0.00
4,226.05
1.11
19.89
3.00
0.00
0.00
0.00
24.00
4.61%
82.87%
12.52%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
8,026.12
0.00
8,026.12
0.00
0.00
0.00
0.00
10.00
0.00
10.00
0.00%
0.00%
0.00%
0.00%
40.00%
0.00%
0.00
0.00
0.00
0.00
8,918.36
0.00
8,918.36
0.00
0.00
0.00
0.00
15.60
0.00
15.60
0.00%
0.00%
0.00%
0.00%
40.00%
0.00%
0.00
0.00
0.00
0.00
7,024.68
0.00
7,024.68
0.00
0.00
0.00
0.00
12.80
0.00
12.80
0.00%
0.00%
0.00%
0.00%
40.00%
0.00%
0.00
0.00
0.00
0.00
1,327.91
1,266.57
2,594.48
21.66
100%
100%
40%
40%
40%
0.00
0.00
0.00
0.00
11.09
10.57
0.00%
0.00%
0.00%
0.00%
33.59%
32.04%
0.00
0.00
0.00
0.00
0.00
12,243.54
12,243.54
0.00
0.00
0.00
0.00
0.00
1,307.10
1,307.10
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
0.00
0.00
0.00
0.00
0.00
198,161.69
198,161.69
3,008.42
0.00
0.00
0.00
0.00
0.00
3,008.42
0.00%
0.00%
0.00%
0.00%
0.00%
83.21%
0.00
0.00
0.00
0.00
0.00
0.00
66%
50%
83%
0.00
OBRA
UBICACIN
ITEM
PART
04.03.02
04.03.03
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
06.00.00
06.01.00
DESCRIPCION
MITIGACION AMBIENTAL
PROGRAMA DE SUPERVISION Y VIGILANCIA
PROGRAMA DE SEALIZACION
PROGRAMA DE REFORESTACION
PLAN DE CONTINGENCIAS
UNID.
MEDIDA
UND
ML
ML
METRADO
1.00
1,080.00
540.00
826.18
39,396.35
10,105.62
0.00
84,424.91
MES
6.00
24,000.00
UND
HAS
GLB
GLB
0
UND
28.00
0.95
1.00
1.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
PRESUPUESTO
5,768.56
4,278.04
46,878.31
3,500.00
0.00
9,927.66
114.00
6,896.43
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
826.18
0.00
0%
826.18
0.00
0.00
0.00
0.00
0.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
23,637.81
23,637.81
0.00
0.00
0.00
0.00
0.00
648.00
648.00
0.00%
0.00%
0.00%
0.00%
0.00%
60.00%
0.00
0.00
0.00
0.00
0.00
10,105.62
10,105.62
0.00
0.00
0.00
0.00
0.00
540.00
540.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
12,000.00
12,000.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
0.00
0.00
0.00
3,708.36
686.73
686.74
5,081.83
0.00
0.00
0.00
18.00
3.33
3.33
24.67
0.00%
0.00%
0.00%
64.29%
11.90%
11.90%
0.00
0.00
0.00
4,278.04
0.00
0.00
0.00
0.00
0.00
0.95
0.00
0.00
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
17,684.90
4,905.55
18,356.31
40,946.76
0.00
0.00
0.00
0.38
0.10
0.39
0.87
0.00%
0.00%
0.00%
37.73%
10.46%
39.16%
0.00
0.00
0.00
2,450.00
0.00
550.00
3,000.00
0.86
0.00
0.00
0.00
0.70
0.00
0.16
0.00%
0.00%
0.00%
70.00%
0.00%
15.71%
0.00
0.00
603.60
1,810.80
1,494.01
1,494.01
1.00
100%
60%
100%
50%
88%
4,278.04
0.95
100%
87%
86%
5,402.42
OBRA
UBICACIN
ITEM
PART
06.02.00
06.03.00
07.00.00
08.00.00
09.00.00
DESCRIPCION
OTROS
FLETE
UNID.
MEDIDA
UND
UND
GLB
GLB
GLB
METRADO
15.00
31.00
1.00
1.00
1.00
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
PRESUPUESTO
TOTAL
0.00
0.00
9.98
29.93
24.70
24.70
0.00%
0.00%
8.75%
26.26%
21.66%
21.66%
0.00
0.00
0.00
0.00
0.00
792.00
792.00
7.50
1,584.00
0.00
0.00
0.00
0.00
0.00
7.50
0.00%
0.00%
0.00%
0.00%
50.00%
0.00
0.00
603.60
402.40
310.10
61.06
1,377.16
0.00
0.00
12.93
8.62
6.64
1.31
29.50
0.00%
0.00%
41.71%
27.80%
21.43%
4.22%
0.00
0.00
0.00
3,150.00
450.00
26,602.00
30,202.00
0.00
0.00
0.00
0.06
0.01
0.47
0.53
0.00%
0.00%
0.00%
5.55%
0.79%
46.83%
0.00
0.00
0.00
0.00
0.00
990.80
0.00
0.00
0.00
0.00
0.00
1.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
8,199.19
0.00
3,279.68
8,199.19
4,372.90
4,372.91
28,423.87
0.25
0.00
0.10
0.25
0.13
0.13
0.87
25.00%
0.00%
10.00%
25.00%
13.33%
13.33%
56,804.00
990.80
2,588,467.75
78%
0.00%
1,447.23
32,796.77
89.30
67,176.11
50%
95%
53%
990.80
1.00
100%
87%
228,786.86
302,574.32
276,643.17
392,150.80
728,548.32
1,995,879.58
209,690.65
271,949.02
7,057.64
24,036.75
31,789.00
29,064.62
41,200.06
76,542.58
43,370.00
1,125.54
3,833.34
5,069.66
4,635.18
6,570.52
12,206.89
33,441.13
2,903,786.77
75,359.29
256,656.95
339,432.98
310,342.98
439,921.38
817,297.79
2,239,011.37
75,359.29
256,656.95
339,432.98
310,342.98
439,921.38
817,297.79
2,239,011.37
2.60%
8.84%
11.69%
10.69%
15.15%
28.15%
77.11%
COD.
DESCRIPCION INSUMO
UND.
CANT.
PRECIO
0.40
4000.00
PARCIAL
MES 01
COSTO/CANT.
MES 02
COSTO/CANT.
MES 03
COSTO/CANT.
MES 04
COSTO/CANT.
MES 05
COSTO/CANT.
MES 06
COSTO/CANT.
1,600.00
147000011
147000032
147000040
INGENIERO VIAL
TOPOGRAFO
GLB
hh
MES
880.02
6.00
10.51
3000.00
1,600.00
9,247.89
18,000.00
147010002
147010003
147010004
147010023
OPERARIO
OFICIAL
PEON
CONTROLADOR OFICIAL
GLB
hh
hh
hh
hh
0.39
12321.86
12739.84
50768.03
957.41
2000.00
9.21
7.64
5.42
7.64
784.00
113,705.05
97,535.68
275,465.50
7,236.47
0.40
100%
100%
9,247.89
1,849.58
1,849.58
1,849.58
1,849.58
924.79
924.79
176.00
176.00
176.00
176.00
88.00
88.00
880.02
20%
20%
20%
20%
10%
10%
100%
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
18,000.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
17%
17%
17%
17%
17%
17%
100%
784.00
0.39
0.39
100%
100%
2,950.88
10,050.05
13,291.35
12,152.26
17,226.22
32,003.34
87,674.10
319.78
1,089.09
1,440.34
1,316.90
1,866.75
3,468.10
9,500.97
3%
9%
12%
11%
15%
28%
77%
2,531.25
8,620.88
11,401.26
10,424.15
14,776.58
27,452.32
75,206.45
330.63
1,126.04
1,489.20
1,361.57
1,930.08
3,585.75
9,823.26
3%
9%
12%
11%
15%
28%
77%
7,148.90
24,347.56
32,200.05
29,440.45
41,732.80
77,532.33
212,402.09
1,317.54
4,487.23
5,934.44
5,425.85
7,691.32
14,289.13
39,145.50
3%
9%
12%
11%
15%
28%
77%
187.80
639.61
845.89
773.40
1,096.32
2,036.77
5,579.80
24.85
84.62
111.91
102.32
145.05
269.47
738.23
3%
9%
12%
11%
15%
28%
77%
42.97
147010025
147010101
PERFORISTA OFICIAL
ASISTENTE SOCIAL
hh
GLB
5.61
1.56
7.64
2000.00
TOTALES EN S/.
42.97
3,120.00
###
1,600.00
0.40
784.00
147000041
TOTAL
COSTO/CANT.
42.97
5.61
5.61
100%
100%
1,560.00
1,560.00
0.78
0.78
1.56
50%
50%
100%
146,109.56
413,657.31
20,055.39
48,507.68
62,588.13
57,639.83
78,756.71
3,120.00
OBRA
UBICACIN
ITEM
COD.
DESCRIPCION INSUMO
UND.
CANT.
PRECIO
PARCIAL
MES 01
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
359.64
230200000
230220011
239050000
202040009
202040010
AGUA
ALAMBRE NEGRO N8
gln
gln
M3
Kg
Kg
81.80
313.27
724.33
2660.48
921.35
21.80
35.00
8.86
4.50
4.50
1798.19
359.64
11972.14
4129.99
359.64
179.82
179.82
16.36
16.36
16.36
8.18
8.18
20%
20%
20%
10%
10%
0.00
10,982.79
10982.79
6437.52
359.64
16.36
20%
ANALISIS GRANULOMETRICO
UND
1.00
120.00
120.00
204000000
205010004
213000006
ANFO
ARENA FINA
ARENA GRUESA
ASFALTO RC-250
Kg
M3
M3
gln
13.16
62.45
1019.85
1263.40
8.20
60.00
55.00
14.50
107.87
3746.87
56090.93
18324.57
0.00
313.27
313.27
100%
100%
1,287.50
1,287.50
1,287.50
1,287.50
144.87
144.87
144.87
144.87
72.43
72.43
20%
20%
20%
20%
643.75
10%
643.75
10%
100%
2,394.43
2,394.43
2,394.43
2,394.43
1,197.21
1,197.21
11,972.14
532.10
532.10
532.10
532.10
266.05
266.05
2,660.48
20%
20%
20%
20%
10%
10%
100%
826.00
826.00
826.00
826.00
413.00
413.00
4,129.99
184.27
184.27
184.27
184.27
92.13
92.13
921.35
20%
20%
20%
20%
10%
10%
100%
230750100
259010059
220010001
221000000
BOLETIN AMBIENTAL
JGO
UND
pln
gln
BOL
0.18
600.00
330.00
6633.90
13286.07
1480.00
1.00
13.00
9.50
22.00
259.59
600.00
4290.00
1.00
100%
100%
107.87
13.16
13.16
100%
100%
749.37
749.37
749.37
749.37
374.69
374.69
12.49
12.49
12.49
12.49
6.24
6.24
62.45
20%
20%
20%
20%
10%
10%
100%
11,218.19
11,218.19
11,218.19
11,218.19
5,609.09
5,609.09
56,090.93
203.97
203.97
203.97
203.97
101.99
101.99
1,019.85
20%
20%
20%
20%
10%
10%
100%
0.00
1,832.46
3,664.91
3,664.91
3,664.91
5,497.37
18,324.57
0.00
126.34
252.68
252.68
252.68
379.02
1,263.40
0%
10%
20%
20%
20%
30%
202010061
Kg
Kg
16.00
1471.30
6.50
4.50
104.00
6625.83
100%
259.59
0.18
100%
100%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
17%
17%
17%
17%
17%
17%
CORDON DETONANTE 3P
78.93
1.00
78.93
262000015
M3
UND
24390.99
56.00
4.50
32.00
109759.46
4,290.00
165.00
165.00
330.00
50%
50%
100%
0.00
63,022.05
63,022.05
0.00
6,633.90
6,633.90
0%
100%
58,458.35
58,458.35
58,458.35
58,458.35
29,229.18
29,229.18
292,291.75
2,657.21
2,657.21
2,657.21
2,657.21
1,328.61
1,328.61
13,286.07
100%
20%
20%
20%
20%
10%
10%
100%
52.00
104.00
8.00
8.00
16.00
50%
50%
100%
1,325.17
1,325.17
1,325.17
1,325.17
662.58
662.58
6,625.83
294.26
294.26
294.26
294.26
147.13
147.13
1,471.30
20%
20%
20%
20%
10%
10%
100%
78.93
78.93
78.93
100%
100%
0.00
0.00
0.00
65,855.68
43,903.78
109,759.46
24,390.99
0.00
0.00
0.00
0.00
14,634.59
9,756.40
0%
0%
0%
0%
60%
40%
100%
1,792.00
1,792.00
1792.00
56.00
56.00
100%
100%
72.79
228000022
DINAMITA
Kg
4.39
16.50
72.79
237040037
237040035
237040039
237040038
243510062
203030048
204000005
ESTACA DE MADERA
FILLER
UND
UND
UND
UND
UND
UND
Kg
Kg
5.00
5.00
5.00
5.00
5.00
2420.60
44182.55
8108.10
50.00
25.00
55.00
50.00
60.00
0.50
3.10
1.95
250.00
72.79
4.39
4.39
100%
100%
25.00
237040036
50.00
50.00
25.00
250.00
1.00
1.00
1.00
0.50
5.00
20%
20%
20%
10%
100%
50.00
75.00
2.00
3.00
5.00
40%
60%
100%
110.00
165.00
250.00
300.00
15810.80
50.00
1.00
20%
275.00
136965.93
50.00
0.50
10%
125.00
1210.30
600.00
100%
2,145.00
0.00
239020100
600.00
2,145.00
78.93
227010000
3,746.87
0.18
52.00
202130021
724.33
120.00
63022.05
292291.75
6,437.52
1.00
259.59
230020098
81.80
100%
0%
107.87
228010005
1,798.19
10,982.79
120.00
239150010
TOTAL
COSTO/CANT.
125.00
275.00
2.00
3.00
5.00
40%
60%
100%
100.00
150.00
250.00
2.00
3.00
5.00
40%
60%
100%
120.00
180.00
300.00
2.00
3.00
5.00
40%
60%
100%
242.06
242.06
242.06
242.06
121.03
121.03
484.12
484.12
484.12
484.12
242.06
242.06
1,210.30
2,420.60
20%
20%
20%
20%
10%
10%
100%
27,393.19
27,393.19
27,393.19
27,393.19
13,696.59
13,696.59
136,965.93
8,836.51
8,836.51
8,836.51
8,836.51
4,418.26
4,418.26
44,182.55
20%
20%
20%
20%
10%
10%
0.00
15,810.80
100%
15,810.80
204000005
FILLER
Kg
8108.10
1.95
15810.80
0.00
8,108.10
8,108.10
0%
100%
100%
65.78
227020011
239060013
239080045
FULMINANTE
HOJA DE SIERRA
UND
UND
GLB
43.85
876.95
7.00
1.50
5.00
600.00
65.78
4384.76
4200.00
65.78
43.85
43.85
100%
100%
876.95
876.95
876.95
876.95
438.48
438.48
175.39
175.39
175.39
175.39
87.69
87.69
876.95
20%
20%
20%
20%
10%
10%
100%
420.00
840.00
840.00
840.00
840.00
420.00
4,200.00
0.70
1.40
1.40
1.40
1.40
0.70
10%
20%
20%
20%
20%
10%
3,500.00
239080049
GLB
1.00
3500.00
3500.00
KEROSENE INDUSTRIAL
gln
248.77
13.50
1.00
1.00
100%
100%
3353.81
3,353.81
3,353.81
0.00
248.77
248.77
0%
100%
100%
489.13
217000021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
978.25
0.50
489.13
489.13
978.25
978.25
100%
100%
8.41
243570051
LEA
CGA
10.52
8.00
84.14
16.83
16.83
16.83
25.24
LIJA
UND
35.47
2.00
70.94
2.10
2.10
2.10
3.16
10.52
20%
20%
20%
30%
100%
70.94
35.47
35.47
100%
100%
7.75
239020006
244010019
hja
p2
2.98
420.00
2.50
1.90
7.75
798.00
399.00
399.00
210.00
210.00
50%
243010003
205300085
MADERA TORNILLO
MATERIAL SELECCIONADO
p2
M3
25187.71
911.86
3.40
4.00
85633.13
3647.44
MECHA LENTA
17.54
1.10
19.29
2.98
100%
798.00
420.00
50%
100%
17,126.63
17,126.63
17,126.63
17,126.63
8,563.31
8,563.31
85,633.13
5,037.54
5,037.54
5,037.54
5,037.54
2,518.77
2,518.77
25,187.71
20%
20%
20%
20%
10%
10%
100%
729.49
729.49
729.49
729.49
364.74
364.74
3,647.44
182.37
182.37
182.37
182.37
91.19
91.19
911.86
20%
20%
20%
20%
10%
10%
100%
19.29
17.54
17.54
100%
100%
662.20
230300006
Kg
63.00
10.50
662.20
63.00
17,730.00
232970002
MOVILIZACION Y DESMOVILIZACION
GLB
2.00
17730.00
35460.00
HA
0.56
90000.00
50400.00
100%
35,460.00
1.00
1.00
2.00
50%
50%
100%
50,400.00
0.56
0.56
100%
30.24
202060006
253100003
PEGAMENTO ASFALTICO
PETROLEO
gln
JGO
gln
0.38
242.00
1197.79
75.00
8.00
12.00
30.24
1936.00
14373.45
M3
2040.16
70.00
142810.94
0.38
0.38
100%
774.40
1,161.60
1,936.00
96.80
145.20
40%
60%
M3
29.28
35.00
1024.80
14,373.45
1,197.79
1,197.79
100%
14,281.09
28,562.19
28,562.19
28,562.19
28,562.19
14,281.09
142,810.94
204.02
408.03
408.03
408.03
408.03
204.02
2,040.16
10%
20%
20%
20%
20%
10%
254060000
PINTURA ANTICORROSIVA
M3
gln
206.19
1.19
35.00
42.00
7216.77
29.28
29.28
100%
1,443.35
1,443.35
1,443.35
721.68
721.68
PINTURA ESMALTE
gln
41.41
30.00
41.24
41.24
41.24
20.62
20.62
206.19
20%
20%
20%
10%
10%
100%
50.06
50.06
50.06
1242.19
1.19
1.19
100%
100%
1,242.19
41.41
41.41
100%
100%
693.00
254020036
279560004
239090050
gln
UND
UND
15.40
1.00
1581.62
45.00
480.00
2.00
693.00
480.00
3163.23
UND
1.00
30.00
30.00
15.40
100%
100%
480.00
480.00
1.00
1.00
100%
100%
3,163.23
3,163.23
1,581.62
1,581.62
100%
100%
UND
30.00
30.00
900.00
1.00
100%
100%
239150007
UND
UND
1.00
1.00
35.00
30.00
35.00
30.00
180.00
180.00
180.00
180.00
90.00
900.00
3.00
6.00
6.00
6.00
6.00
3.00
30.00
10%
20%
20%
20%
20%
10%
100%
35.00
239150008
30.00
1.00
90.00
239150000
693.00
15.40
30.00
239150009
7,216.77
41.24
20%
1,242.19
254110011
100%
1,024.80
100%
1,443.35
205000033
242.00
100%
14,373.45
1,024.80
205020051
30.24
100%
100%
205000004
63.00
100%
100%
213010000
662.20
17,730.00
50,400.00
239080050
7.75
2.98
100%
19.29
227000010
84.14
1.05
10%
70.94
230990019
7.00
100%
3,500.00
0.00
253000000
4,384.76
35.00
1.00
1.00
100%
100%
30.00
30.00
1.00
1.00
239150007
UND
1.00
30.00
30.00
100%
513.00
239150005
UND
114.00
45.00
5130.00
100%
1,026.00
1,026.00
11.40
22.80
22.80
10%
20%
20%
1,026.00
1,026.00
513.00
22.80
22.80
11.40
114.00
20%
20%
10%
100%
147.42
230460039
243600011
243600037
256020000
UND
pza
UND
UND
3.69
56.00
12.00
25.00
35.00
8.00
30.00
345.00
147.42
448.00
360.00
147.42
3.69
3.69
100%
100%
224.00
224.00
448.00
28.00
28.00
56.00
50%
50%
100%
180.00
180.00
360.00
6.00
6.00
12.00
50%
50%
100%
8625.00
3,450.00
5,175.00
10.00
15.00
40%
60%
1,680.00
256020101
UND
28.00
60.00
1680.00
256020100
262000016
UND
UND
UND
32.00
39.00
378.00
295.00
315.00
4.60
THINER
gln
2.44
16.00
28.00
28.00
100%
9440.00
12285.00
5,664.00
19.20
60%
100%
4,914.00
7,371.00
12,285.00
204010003
THINNER ACRILICO
gln
M3
4.34
19.00
18.00
20.00
15.60
23.40
39.00
60%
100%
1,738.80
1,738.80
378.00
378.00
100%
100%
39.33
2.44
2.44
100%
100%
78.40
380.00
6,559.35
232010096
245010007
TRIPLAY 4 X 8 X 6 MM.
GLB
pln
1.00
407.06
32796.77
50.00
32796.77
20353.05
6,559.35
6,559.35
6,559.35
3,279.68
8.19
330.00
4.34
100%
380.00
380.00
19.00
19.00
100%
100%
3,279.68
32,796.77
0.20
0.20
0.20
0.20
0.10
0.10
1.00
20%
20%
20%
20%
10%
10%
100%
4,070.61
4,070.61
4,070.61
4,070.61
2,035.31
2,035.31
20,353.05
81.41
81.41
81.41
81.41
40.71
40.71
407.06
20%
20%
20%
20%
10%
10%
100%
2702.70
2,702.70
8.19
8.19
100%
100%
130.87
288010002
17.22
7.60
130.87
130.87
17.22
17.22
100%
100%
1,490.00
265000058
239080044
221020007
229030002
UTILES DE ESCRITORIO
GLB
UND
BOL
74.50
7.00
0.15
277.09
20.00
300.00
80.00
5.00
TOTALES EN S/.
1490.00
2100.00
11.92
1385.49
1,215,909.10
78.40
4.34
100%
2,702.70
273010060
32.00
40%
78.40
229200013
9,440.00
12.80
40%
1738.80
39.33
25.00
100%
100%
39.33
253030027
8,625.00
1,680.00
3,776.00
239900099
5,130.00
1,490.00
74.50
74.50
100%
100%
2,100.00
350.00
350.00
350.00
350.00
350.00
350.00
1.17
1.17
1.17
1.17
1.17
1.17
7.00
17%
17%
17%
17%
17%
17%
100%
1.19
2.38
2.38
2.38
2.38
1.19
11.92
0.01
0.03
0.03
0.03
0.03
0.01
0.15
10%
20%
20%
20%
20%
10%
100%
277.10
277.10
277.10
277.10
138.55
138.55
1,385.49
55.42
55.42
55.42
55.42
27.71
27.71
277.09
20%
20%
20%
20%
10%
10%
100%
231,113.30
170,991.52
170,509.69
281,390.01
181,361.95
180,542.65
1,215,909.10
OBRA
UBICACIN
ITEM
COD.
DESCRIPCION INSUMO
UND.
CANT.
PRECIO
COSTO/CANT.
349050003
349050004
348040003
349130004
349040009
349030004
hm
hm
hm
hm
hm
hm
5.16
3.32
529.72
5.16
557.22
607.94
200.00
100.00
90.00
250.00
190.00
11.25
MES 02
MES 03
MES 04
MES 05
MES 06
COSTO/CANT.
1031.94
331.70
47668.98
6838.96
COSTO/CANT.
COSTO/CANT.
COSTO/CANT.
hm
2.81
150.00
420.96
0.00
1,031.94
0.00
5.16
1,031.94
5.16
0%
100%
100%
0.00
331.70
331.70
0.00
3.32
3.32
0%
100%
100%
0.00
0.00
0.00
28,601.39
19,067.59
0.00
0.00
0.00
0.00
317.83
211.89
529.72
0%
0%
0%
0%
60%
40%
100%
0.00
1,289.93
0.00
5.16
337010001
HERRAMIENTAS MANUALES
hm
%MO
4.48
0.00
150.00
0.00
5.16
0%
100%
100%
0.00
0.00
0.00
0.00
63,475.39
42,316.92
0.00
0.00
0.00
0.00
334.33
222.89
557.22
0%
0%
0%
0%
60%
40%
100%
1,367.79
1,367.79
1,367.79
1,367.79
683.90
683.90
6,838.96
121.59
121.59
121.59
121.59
60.79
60.79
607.94
20%
20%
20%
20%
10%
10%
100%
420.96
2.81
100%
100%
349100011
348080000
349090000
349890001
349250001
349050020
349030013
349030025
349030043
349050015
349190005
349040033
349040034
349030061
349520002
348110004
348110002
MOTOBOMBA 10 HP 4"
MOTONIVELADORA DE 125 HP
NIVEL TOPOGRAFICO
PAVIMENTADORA DE 65 HP
TEODOLITO Y MIRAS
VIBRADOR DE 4 HP CAP.=1.50"
VOLQUETE DE 10 M3
VOLQUETE DE 6 M3
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
5.61
844.26
212.13
752.67
625.39
6.63
6.63
753.47
19.97
6.63
6.63
201.71
116.93
593.16
5.16
564.19
1120.63
417.02
30.00
11.25
12.00
180.00
3.75
200.00
750.00
150.00
150.00
150.00
230.00
6.25
230.00
280.00
150.00
7.50
130.00
90.00
168.38
9502.19
2531.09
134961.23
2345.36
4.48
100%
100%
24,580.75
4,916.15
4,916.15
4,916.15
4,916.15
2,458.08
2,458.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20%
20%
20%
20%
10%
10%
100%
168.38
5.61
5.61
100%
100%
1,900.44
1,900.44
1,900.44
1,900.44
950.22
950.22
168.85
168.85
168.85
168.85
84.43
84.43
844.26
20%
20%
20%
20%
10%
10%
100%
0.00
0.00
0.00
0.00
1,518.65
1,012.44
2,531.09
0.00
0.00
0.00
0.00
127.28
84.85
212.13
0%
0%
0%
0%
60%
40%
100%
0.00
0.00
0.00
0.00
80,976.74
53,984.49
134,961.23
0.00
0.00
0.00
0.00
451.60
301.07
752.67
0%
0%
0%
0%
60%
40%
100%
469.07
469.07
469.07
469.07
234.54
234.54
2,345.36
125.08
125.08
125.08
125.08
62.54
62.54
625.39
20%
20%
20%
20%
10%
10%
100%
0.00
1,326.78
0.00
6.63
6.63
0%
100%
100%
0.00
4,975.43
4,975.43
0.00
6.63
6.63
0%
100%
100%
1326.78
4975.43
113712.72
0.00
0.00
0.00
68,227.63
45,485.09
0.00
0.00
0.00
452.08
301.39
753.47
0%
0%
0%
0%
60%
40%
100%
1,808.49
1,205.66
11.98
7.99
19.97
60%
40%
100%
1511.06
166079.20
145664.89
37347.68
113,712.72
3,014.15
0.00
995.09
0.00
6.63
995.09
6.63
0%
100%
100%
0.00
1,511.06
1,511.06
0.00
6.63
6.63
0%
100%
100%
252.12
252.12
252.12
252.12
126.06
126.06
40.34
40.34
40.34
40.34
20.17
20.17
201.71
20%
20%
20%
20%
10%
10%
100%
10,716.96
8,037.72
8,037.72
46.77
35.08
35.08
116.93
40%
30%
30%
100%
0.00
0.00
0.00
0.00
99,647.52
66,431.68
0.00
0.00
0.00
0.00
355.90
237.26
593.16
0%
0%
0%
0%
60%
40%
100%
0.00
773.96
0.00
5.16
5.16
0%
100%
100%
773.96
4231.83
1,326.78
0.00
995.09
26792.39
9,502.19
0.00
3014.15
1260.61
672.00
4.48
168.38
349060006
105,792.31
2.81
672.00
24580.75
47,668.98
1,289.93
672.00
348950003
COSTO/CANT.
0.00
1289.93
105792.31
COSTO/CANT.
420.96
349020011
TOTAL
PARCIAL
1,260.61
26,792.39
166,079.20
773.96
846.37
846.37
846.37
846.37
423.18
423.18
112.84
112.84
112.84
112.84
56.42
56.42
4,231.83
564.19
20%
20%
20%
20%
10%
10%
100%
0.00
0.00
0.00
0.00
87,398.93
58,265.96
145,664.89
0.00
0.00
0.00
0.00
672.38
448.25
1,120.63
0%
0%
0%
0%
60%
40%
100%
7,469.54
7,469.54
7,469.54
7,469.54
3,734.77
3,734.77
37,347.68
348110002
VOLQUETE DE 6 M3
hm
417.02
90.00
TOTALES EN S/.
37347.68
845,821.57
83.40
83.40
83.40
83.40
41.70
41.70
417.02
20%
20%
20%
20%
10%
10%
100%
28,527.77
27,067.68
26,464.85
29,457.37
438,456.99
295,846.91
845,821.57