Example
1. A can do a certain job in 25 da ys which B alone
can do in 20 da ys. A started the work and was
joined by B aft er 10 days. Find the total number of
da ys taken to complete the work?
a) 10 days b) 12.66days c) 16.66days
d) 20
da ys
2. A can do a piece of work in 20 days, which B
alone can do in 30 days. If they work together and
get a payment of Rs.380, what is Bs share?
a) Rs.152 b) Rs.228
c)Rs.246
d)Rs.272
WINSTON LEARNING
www.winstonlearning.com
| UG QAT-7
WINSTON LEARNING
2
3
6
11
= 10 + 10 + 10 = 10
www.winstonlearning.com
| UG QAT-7
3
S
Working at 5 m 2 /hr, 10 2 = 20 m 2 can be painted
in 4 hours.
20 5
3
25
5 S 4 = 20 S = 4 3 = 3 m 2 /hr.
5 5 25 125
S
3 = 3 3 = 9 m 2 /hr
The new working rate is
The area to be painted = 40 m 2
The required time =(40 9)/125=72/25hr. Ans.(b).
5.
1 1 1 6 3 1 8 2
2 4 12
12 = 12 3
=
Let A and B together be opened for a hours,
after C is shut.
a a 1
4
3a
1
2 4 3 4 = 3 a = 9
. Hence, (b). (CHANGE OPTION B)
6.
12
3
6
5
30
In 12 minutes,
th = 25 th part of
cistern is filled. Hence, (b).
33045
= Rs.13218. Hence, (b).
Share of C = 15