Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PROYEK
LOKASI
PEKERJAAN
:
:
:
NO.
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
TOTAL MCSP
(Rp.)
set
1.00
45,542,250.00
45,542,250.00
bh
1.00
1,950,000.00
1,950,000.00
MDF
set
1.00
1,200,000.00
1,200,000.00
set
1.00
130,000.00
130,000.00
It
1.00
3,000,000.00
3,000,000.00
51,822,250.00
ttk
5.00
500,000.00
650,000.00
Handset Telephone.
bh
5.00
350,000.00
1,750,000.00
Outlet Telephone
bh
5.00
200,000.00
1,000,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
ttk
3.00
400,000.00
1,200,000.00
Handset Telephone.
bh
3.00
350,000.00
1,050,000.00
Outlet Telephone
bh
3.00
200,000.00
600,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
ttk
3.00
500,000.00
1,500,000.00
Handset Telephone.
bh
3.00
350,000.00
1,050,000.00
Outlet Telephone
bh
3.00
200,000.00
600,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
ttk
14.00
600,000.00
8,400,000.00
Handset Telephone.
bh
14.00
350,000.00
4,900,000.00
Outlet Telephone
bh
14.00
200,000.00
2,800,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
ttk
14.00
700,000.00
9,800,000.00
Handset Telephone.
bh
14.00
350,000.00
4,900,000.00
Outlet Telephone
bh
14.00
200,000.00
2,800,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
ttk
14.00
800,000.00
11,200,000.00
Handset Telephone.
bh
14.00
350,000.00
4,900,000.00
Outlet Telephone
bh
14.00
200,000.00
2,800,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
Lantai 4 :
Instalasi
TtikTelephone
Handset Telephone.
ttk
14.00
900,000.00
12,600,000.00
bh
14.00
350,000.00
4,900,000.00
Outlet Telephone
bh
14.00
200,000.00
2,800,000.00
TB / Junction Box
bh
1.00
350,000.00
350,000.00
Lantai Dasar.
Lantai Mezzanine.
Lantai 1 :
Lantai 2 :
Lantai 3:
Lanai 5 :
Instalasi Titik Telephone
ttk
14.00
1,000,000.00
14,000,000.00
Handset Telephone.
bh
14.00
350,000.00
4,900,000.00
NO.
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
Outlet Telephone
bh
14.00
200,000.00
2,800,000.00
TB / Junction Boat
bh
1.00
350,000.00
350,000.00
ttk
5.00
1,100,000.00
5,500,000.00
Handset Telephone.
bh
5.00
350,000.00
1,750,000.00
Outlet Telephone
bh
5.00
200,000.00
1,000,000.00
TB /'unction Box
bh
1.00
350,000.00
350,000.00
It
1.00
5,000,000.00
5,000,000.00
TOTAL MCSP
(Rp.)
Lanai 6 :
120,300,000.00
NO.
3
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
TOTAL MCSP
(Rp.)
set
1.00
51,000,000.00
ttk
3.00
750,000.00
2,250,000.00
ttk
3.00
3,000,000.00
9,000,000.00
ttk
3.00
200,000.00
600,000.00
ttk
2.00
3,200,000.00
6,400,000.00
ttk
2.00
200,000.00
400,000.00
ttk
3.00
3,400,000.00
10,200,000.00
ttk
3.00
200,000.00
600,000.00
ttk
3.00
3,600,000.00
10,800,000.00
ttk
3.00
200,000.00
600,000.00
ttk
3.00
3,800,000.00
11,400,000.00
ttk
3.00
200,000.00
600,000.00
ttk
3.00
4,000,000.00
12,000,000.00
ttk
3.00
200,000.00
600,000.00
ttk
3.00
4,200,000.00
12,600,000.00
ttk
3.00
200,000.00
600,000.00
ttk
1.00
1,500,000.00
1,500,000.00
ttk
3.00
4,400,000.00
13,200,000.00
ttk
3.00
200,000.00
600,000.00
It
1.00
5,000,000.00
5,000,000.00
Wiring Management
Server
UPS
Lantai Dasar:
Lantai Mezanine :
Lantai 1
Lantai 2
Lantai 3
Lantai 4 :
Lantai 5 :
Lantai 6:
0.00
Sub Total Pekerjaan Sistern Data dan Internet
149,950,000.00
set
1.00
0.00
0.00
NO.
5
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
ttk
19.00
750,000.00
bh
1.00
600,000.00
14,250,000.00
600,000.00
bh
18.00
550,000.00
9,900,000.00
bh
0.00
500,000.00
0.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator Lamp
bh
2.00
350,000.00
700,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
ttk
17.00
750,000.00
12,750,000.00
bh
15.00
600,000.00
9,000,000.00
bh
2.00
550,000.00
1,100,000.00
bh
0.00
500,000.00
0.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator Lamp
bh
2.00
350,000.00
700,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
ttk
13.00
750,000.00
9,750,000.00
bh
13.00
600,000.00
7,800,000.00
bh
2.00
500,000.00
1,000,000.00
Alarm Bell
bh
1.00
750,000.00
750,000.00
Breaking Glass
bh
1.00
600,000.00
600,000.00
Indikator Lamp
bh
1.00
350,000.00
350,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
ttk
22.00
750,000.00
16,500,000.00
bh
7.00
600,000.00
4,200,000.00
bh
15.00
550,000.00
8,250,000.00
bh
2.00
500,000.00
1,000,000.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator Lamp
bh
2.00
350,000.00
700,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
ttk
22.00
750,000.00
16,500,000.00
bh
7.00
600,000.00
4,200,000.00
bh
15.00
550,000.00
8,250,000.00
bh
2.00
500,000.00
1,000,000.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator lamp
bh
2.00
350,000.00
700,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
ttk
22.00
750,000.00
16,500,000.00
bh
7.00
600,000.00
4,200,000.00
bh
15.00
550,000.00
8,250,000.00
bh
2.00
500,000.00
1,000,000.00
bh
2.00
750,000.00
1,500,000.00
bh
2.00
600,000.00
1,200,000.00
bh
2.00
350,000.00
700,000.00
bh
1.00
75,000.00
75,000.00
Lantai Dasar :
Lantal Mezzanine :
Lantai 1:
Lantai 2 :
Lantai 3 :
ttk
22.00
750,000.00
16,500,000.00
bh
7.00
600,000.00
4,200,000.00
bh
15.00
550,000.00
8,250,000.00
bh
2.00
500,000.00
1,000,000.00
bh
2.00
750,000.00
1,500,000.00
bh
2.00
600,000.00
1,200,000.00
bh
2.00
350,000.00
700,000.00
bh
1.00
75,000.00
75,000.00
ttk
22.00
750,000.00
16,500,000.00
bh
7.00
600,000.00
4,200,000.00
bh
15.00
550,000.00
8,250,000.00
bh
2.00
500,000.00
1,000,000.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator Lamp
bh
2.00
350,000.00
700,000.00
Lantai 5 :
TOTAL MCSP
(Rp.)
NO.
URAIAN PEKERJAAN
End Of Line
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
bh
1.00
75,000.00
75,000.00
ttk
11.00
750,000.00
8,250,000.00
bh
4.00
600,000.00
2,400,000.00
bh
7.00
550,000.00
3,850,000.00
bh
2.00
500,000.00
1,000,000.00
Alarm Bell
bh
2.00
750,000.00
1,500,000.00
Breaking Glass
bh
2.00
600,000.00
1,200,000.00
Indikator Lamp
bh
2.00
350,000.00
700,000.00
End Of Line
bh
1.00
75,000.00
75,000.00
It
1.00
5,000,000.00
5,000,000.00
TOTAL MCSP
(Rp.)
Lantai 6 :
265,975,000.00
NO.
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
TOTAL MCSP
(Rp.)
set
1.00
20,000,000.00
Auto switcher
TV Monitor 22"
Digital Video Recorder
Back Up UPS
Dan kelengkapannya
Sub Total Pekerjaan Sistem CCTV
7
20,000,000.00
ttk
3.00
900,000.00
bh
0.00
900,000.00
2,700,000.00
0.00
bh
3.00
800,000.00
2,400,000.00
ttk
3.00
800,000.00
2,400,000.00
bh
1.00
900,000.00
900,000.00
bh
2.00
800,000.00
1,600,000.00
ttk
2.00
900,000.00
1,800,000.00
bh
2.00
900,000.00
1,800,000.00
bh
0.00
800,000.00
0.00
ttk
2.00
1,000,000.00
2,000,000.00
bh
2.00
900,000.00
1,800,000.00
ttk
2.00
1,100,000.00
2,200,000.00
bh
2.00
900,000.00
1,800,000.00
ttk
2.00
1,200,000.00
2,400,000.00
bh
2.00
900,000.00
1,800,000.00
ttk
2.00
1,300,000.00
2,600,000.00
bh
2.00
900,000.00
1,800,000.00
Lantai 5 :
Instalasi
CCTV , coaxial RG 6
Pengadaan dan pemasangan Dome Cmr
ttk
2.00
1,400,000.00
2,800,000.00
bh
2.00
900,000.00
1,800,000.00
ttk
3.00
1,500,000.00
4,500,000.00
bh
2.00
900,000.00
1,800,000.00
bh
1.00
800,000.00
800,000.00
It
1.00
5,000,000.00
5,000,000.00
Lantai Dasar :
Lantai Mezzanine :
Lantai 1 :
Lantai 2:
Lantai 3 ;
Lantai 4 :
Lantai 6:
46,700,000.00
ttk
ttk
bh
bh
bh
1.00
1.00
1.00
1.00
0.00
500,000.00
500,000.00
300,000.00
1,500,000.00
1,000,000.00
500,000.00
500,000.00
300,000.00
1,500,000.00
0.00
Lantai Dasar :
Instalasi MAW Main Line RG 6
Instalasi Outlet MAN RG 59
Splitter 4 way
Coupler 4 way
Main Booster
ttk
ttk
bh
bh
bh
2.00
1.00
1.00
1.00
0.00
425,000.00
425,000.00
300,000.00
1,500,000.00
1,000,000.00
850,000.00
425,000.00
300,000.00
1,500,000.00
0.00
Lantai Mezzanine :
NO.
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
ttk
ttk
bh
bh
bh
3.00
2.00
1.00
1.00
0.00
500,000.00
500,000.00
300,000.00
1,500,000.00
1,000,000.00
1,500,000.00
1,000,000.00
300,000.00
1,500,000.00
0.00
Lantai 1:
Instalasi MAW Main Line RG 6
Instalasi Outlet MAW RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
15.00
15.00
1.00
4.00
600,000.00
600,000.00
300,000.00
1,500,000.00
9,000,000.00
9,000,000.00
300,000.00
6,000,000.00
Lantai 2 :
Instalasi MAW Main Line RG 6
Instalasi Outlet MAW RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
15.00
15.00
1.00
4.00
700,000.00
700,000.00
300,000.00
1,500,000.00
10,500,000.00
10,500,000.00
300,000.00
6,000,000.00
Lantai 3 :
Instalasi MAW Main Line RG 6
Instalasi Outlet MAN RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
15.00
15.00
1.00
4.00
800,000.00
800,000.00
300,000.00
1,500,000.00
12,000,000.00
12,000,000.00
300,000.00
6,000,000.00
Lantai 4 :
Instalasi MAW Main Line RG 6
Instalasi Outlet MAW RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
15.00
15.00
1.00
4.00
900,000.00
900,000.00
300,000.00
1,500,000.00
13,500,000.00
13,500,000.00
300,000.00
6,000,000.00
Lantai 5 :
Instalasi MAW Main Line RG 6
Instalasi Outlet MAW RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
15.00
15.00
1.00
4.00
1,000,000.00
1,000,000.00
300,000.00
1,500,000.00
15,000,000.00
15,000,000.00
300,000.00
6,000,000.00
Lantai 7 :
Instalasi MAW Main Line RG 6
Instalasi
Outlet MAW RG 59
Splitter 4 way
Coupler 4 way
ttk
ttk
bh
bh
5.00
5.00
1.00
1.00
1,100,000.00
1,100,000.00
300,000.00
1,500,000.00
5,500,000.00
5,500,000.00
300,000.00
1,500,000.00
It
1.00
5,000,000.00
5,000,000.00
TOTAL MCSP
(Rp.)
179,475,000.00
NO.
9
URAIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
TOTAL MCSP
(Rp.)
set
1.00
22,000,000.00
22,000,000.00
ttk
bh
bh
bh
12.00
3.00
9.00
1.00
600,000.00
900,000.00
600,000.00
1,300,000.00
7,200,000.00
2,700,000.00
5,400,000.00
1,300,000.00
Lantai Dasar :
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control
Pengadaan dan Pemasangan Consieur Mic.
Junction Box SS
ttk
bh
bh
bh
bh
bh
15.00
1.00
1.00
3.00
3.00
1.00
600,000.00
600,000.00
1,250,000.00
425,000.00
2,350,000.00
1,300,000.00
9,000,000.00
600,000.00
1,250,000.00
1,275,000.00
7,050,000.00
1,300,000.00
Lantai Mezanine :
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Pengadaan dan Pemasangan Consieur Mic.
Junction Box SS
ttk
bh
bh
bh
bh
14.00
14.00
1.00
1.00
1.00
600,000.00
600,000.00
1,250,000.00
2,350,000.00
1,300,000.00
8,400,000.00
8,400,000.00
1,250,000.00
2,350,000.00
1,300,000.00
Lantai 1:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction Box SS
ttk
bh
bh
bh
bh
8.00
7.00
1.00
1.00
1.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
4,800,000.00
4,200,000.00
1,250,000.00
425,000.00
1,300,000.00
Lantai 2:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction Box SS
ttk
bh
bh
bh
bh
8.00
7.00
1.00
1.00
1.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
4,800,000.00
4,200,000.00
1,250,000.00
425,000.00
1,300,000.00
Lantai 3:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction Box SS
ttk
bh
bh
bh
bh
8.00
7.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
4,800,000.00
4,200,000.00
ttk
bh
bh
bh
bh
8.00
7.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
4,800,000.00
4,200,000.00
Lantai 5:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction Box SS
ttk
bh
bh
bh
bh
8.00
7.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
4,800,000.00
4,200,000.00
Lantai 6:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction Box SS
ttk
bh
bh
bh
bh
8.00
7.00
4,800,000.00
4,200,000.00
1.00
1.00
600,000.00
600,000.00
1,250,000.00
425,000.00
1,300,000.00
ls
1.00
5,000,000.00
5,000,000.00
Lantai 4:
Instalasi Tata Suara
Ceiling Speaker 3 watt
Wall Speaker
Volume Control.
Junction
Box SS
1.00
1.00
1.00
1.00
1.00
1.00
425,000.00
1,300,000.00
425,000.00
1,300,000.00
425,000.00
1,300,000.00
425,000.00
1,300,000.00
130,625,000.00
NO.
URAIAN PEKERJAAN
TOTAL PEKER/AAN ELEKTRONIKA
Noted :
1. CCTV merk HIKvision
2. Audio menggunakan TOA
3. Pembayaran DP 50%, progress 75% dan 95%, retensi 5%
Hormat Kami
Achmad Ja'far
Direktur
SAT.
VOLUME
HARGA SATUAN
(Rp.)
JUMLAH MCSP
(Rp.)
TOTAL MCSP
(Rp.)
986,847,250.00
PT.KOLINDO PERKASA
Villa Jati Padang Kav 9,Jl.Jati Padang Poncol,
Jakata Selatan 12540
Telp.021.7822692/Fax.021.7822670
Email:kolindo.perkasa@gmail.com
Kolindoperkasa@kolindoperkasa.com
MATERIAL LIST
PROYEK
:
LOKASI
:
PEKERJAAN : STRUKTUR, ARSITEKTUR & MEKANIKAL ELEKTRIKAL
NO.
NAMA MATERIAL
SPESIFIKASI KONTRAK
PEKERJAAN PLUMBING
Ebara. Wilo
Pompa Deepwell
Grundfoss
Pompa Penguras
Ebara
Wavin, Pralon
Wavin, Pralon
Rucika , CM
10
Kitz
11
Floating Valve
Yuta
12
Flexible Joint
Tozen, Afaflex
13
Pressure Gauge
Nagano
14
Roof Drain, Floor Clean Out & Floor Way Riser (PV
Kharisma, Antasan
15
Foot Valve
Mizu
16
Heat Pump
Midea, Wika
17
Roof Tank
18
Saniter
II
Ebara,Firebank Morse
Grundfoss
Spindo
Kitz
Flexible Joint
Tozen, Afaflex
Pressure Gauge
Nagano
Foot Valve
Mizu
Pressure Switch
Saeinomlya
10
Flow Switch
Johnson,
11
Kitz
12
Viking, Tyco
13
Blue-White
14
Samyang 10 K
15
16
Ojjeki, Hooseki
17
Fire Extinguisher
Fireking Servo
MATERIAL
NO.
NAMA MATERIAL
SPESIFIKASI KONTRAK
III
PEKERJAAN HVAC
LG Samsung
Fipa Refrigerant
Denji, Elgin
Seng BJLS
Lokforn, Fumira
Glass Wool
AB Wool, ACI
Grille / Louvre
Flexible Duct
Kabel NYM
IV
PEKERJAAN ELEKTRIKAL
Schneider, ABB, LS
Armature Lampu
nterlite,lndahlite, Locolite
Balast, Lampu
Philips, Osram
MK, Clipsal
Balast, Lampu
Philips, Osram
Clipsal, Ega
10
Penangkal Petir
Bosch-Phillips, TOA
DVD Player
Phillips, Pioner
Tuner FM
Bosch-Phillips, TOA
MATERIAL