Sei sulla pagina 1di 1

7 March 2013

Minutes of Meeting
Project: Resource Optimization
Members:
Shaun
Sherwin
Aeus
Randy
Atoy
Pete
Marvin
Orly
Greg
Current Set-up

Field mouse using the local


SCADA/PLC connected to the PI
System

Next Phase

Innovate the current setup to be


used as a remote diagnostic
tool for plant and pump stations
using the current resources
Resource optimization

How?
Plans:
1. Pete - Assessment for sensors
needed
2. Atoy GUI for the pumps
includes information that will
make a diagnostic tool

3.
4.
5.

6.

a. Current per phase


b. Power
c. Voltage per phase
d. Vibration
e. Winding Temperature
f. Bearing Temperature
g. Power factor
Randy enhancements
Shaun protocols
Sherwin, Greg Texting of:
a. Pump Information such as
Status, Voltage, Current,
Etc.
b. Pumps alarm will be sent
right away.
Two ways of data gathering
a. Manual
i. EventFrames
activities by the
maintenance and
operators
b. Automatic
i. Instruments and
PLC

Advantages
1. Plant Efficiency (sample: Pasay)
2. Remote diagnostic (information
on each pump)
3. Quick asset assessment
(remotely)
Timeline
Pilot (Pasay): March 11 1st week of
May