Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
COMPANY PROFILE
COMPANY REG. NAME
COMPANY BACKGROUND
Company was form and register on 2006.
Facilities were under construction between
2006 2010.
Production operation were start on 2011
mainly focus on ship repair of fishing boat,
government vessel and private vessel.
Shipbuilding operation start on early 2012.
SSME already comply to ISO : 9001 Standard
Facilities
Ship repair &
on 2014.
Shipbuilding
Construction Period
2006
Maintenance
2010
2013
LAYOUT OF YARD
FACILITIES
Overall Area
Yard Area
Hanger
Loading
Office & Hotel
Workshop
Fiber Workshop
70ft)
: 260,000 ft2
: 86,000 ft2
: 32,000 ft2
: 60,000 ft2
: 50,000 ft2 (3 level)
: 10,000 ft2
: 9,800 ft2 (140ft X
ENTRY TO
YARD
IN
A
M AD
RO
MAIN
OFFICE
M
W AI
O N
RK
S
H
A
O
R
D
MAIN
HANGER
SE
H CO
AN N
G DA
ER R
Y
SECONDARY
WINCH HOUSE
BUILDING
BERTH
SLIPW
AY
HEAVY
MACHINERY
W/SHOP
AR F
H
W A
ARE
AR
H
W A
E
AR
LOCATION PLAN
COMPANY ORGANISATION
CHART
COMPANIESS CONSULTANT
Bereau Veritas (M) Sdn. Bhd.
Katsu Perunding Sdn. Bhd.
Kazema Engineering Sdn. Bhd.
Acnetic Engineering Sdn. Bhd.
ATH Engineering
COMPANY FACILITIES
OFFICE FRONT
VIEW
SLIPWAY
WORKSHOP
HANGER
HOTEL
KOPITIAM
MINI SHOP
MAIN WINCH
PORTABLE AIR
COMPRESSOR
BENDING
MACHINE
LATHE MACHINE
CNC PLASMA
CUTTER
WELDING
MACHINE
AIR COMPRESSOR
PORTABLE
GENERATOR
DRILLING MACHINE
CUTTING MACHINE
OUR SERVICES
HULL & MISCELLANEOUS
ENGINEERING
Hull Preservation
Underwater Fittings
Tanks
Sanitary & Drainage
System
Fresh & Saltwater
System
Weather Deck &
Fitting
Internal Hull
Refrigeration System
Main Engine
Gearboxes
Generator
Air Conditioning
Steering System
Fuel & Lubricant
System
Compressed Air
System
Exhaust System
Stabilizer System
PILOT BOAT
FABRICATE
PART
FRAME
INSIDE OF
SUPERSTRUCTURE
TRANSOM AND
SUPER STRUCTURE
FRONT
BULKHEAD
SIDE
PLATING
WELD AT
KEEL
ABOVE VIEW
FULL WELD AT
SIDE
LAST WEEK OF
INTRA
PLATE
ARRANGEMENT
BEFORE BLAST
AFTER BLAST
PROCESS
COATING
PROCESS
THANK
YOU