Sei sulla pagina 1di 1

Basic Engineering Design Basis Part-B

of AISHWARYA Project
at Haldia Refinery, IOCL

DOCUMENT No.
A609-00-02-41-ODB-0001
Rev C
Page 55 of 75

yes
yes

if connected to closed system:


PSV in IBR steam service shall have installed spare.

no

9.9
Control philosophy for vendor package items
9.9.1 For all vendor package supplies, mode of monitoring, control and logics shall be decided
during detailed engineering Pneumatic based control system for any package shall not be
specified. Instead PLC based system shall be specified.
9.10 Standard Instrumentation:
9.10.1 Packed towers:
(Owner to indicate the preferences)
Local differential pressure indication for each bed:
Local differential pressure indication for total section:
Control Room differential pressure indication for each bed:
Control Room differential pressure indication for critical beds:
Control Room differential pressure indication for total section:
1+1 Basket strainers in lines going to packed beds:
Single basket strainers in lines going to packed beds:
9.10.2 Heat Exchangers:
(Owner to indicate the preferences)
Isolation valves at both inlet & outlet in cooling water service:
Isolation valves at only inlet in cooling water service:
Isolation and bypass valves for process side of all exchangers:
Isolation and bypass valves for only exchangers which can
be taken out for maintenance when plant is running:
Thermowell at process inlet and outlet of each exchanger :
Local TI at cooling water outlet of each exchanger:
Local TI at process inlet and outlet of each service:
Control Room TI at process inlet and outlet of each service:
Control room PI across exchanger train
PG across each exchanger at inlet /outlet

yes
yes
yes
yes
yes
yes
yes

no
no
no
no
no
no
no

yes
yes
yes

no
no
no

yes
yes

no
no

yes
yes
yes
yes
yes

no
no
no
no
no

9.10.3 Utility lines: As a minimum, the following shall be provided in unit utility headers:
Table-9.1: Instrumentation for Utility Headers at Unit B/L

UTILITY
HP STEAM
MP
STEAM
LP STEAM
Condensate
CW supply
CW return
Instrument

local
PI
y
y
y
y
y
y
y

Template No. 5-0000-0001-T2 Rev. 1


Page 102 of 10496

DCS
PI
y
y
y
y
y
y
y

PAL/
PAH
y
y

y
y
y

local
TI
y
y

DCS
TI
y
y

y
y
y
y
y

y
y
y
y

TAL/
TAH
y
y

y
y

DCS
FI
y
y

FAL/
FAH
y
y

y
y
y
y
y

Copyrights EIL All rights reserved

DCS
FQ
y
y
y
y
y
y

Potrebbero piacerti anche