Sei sulla pagina 1di 2
COVENANT CG PLUG CATCHER DUAL TUBE PRODUCTION TESTING Onshore flowback and well testing Mill out operations of down-hole plugs Well clean-up operations Extended production tests Stops debris from milled plugs preventing plugging in flow back equipment * Dual plug catcher, incorporates two legs to divert flow through one leg while the clean up process continues + 2 complete bypass allows continuous operation One Plug (or debris) Catcher is designed to recover large solid pieces that flow from a well during mill out operations of down hole plugs. Plug Catchers are normally positioned upstream of the choke manifold to prevent erosion damage of downstream equipment. Plug Catchers are part of the well control kit and are designed to meet API 6A specifications. Covenant’s plug catchers contain perforated ot slotted tubing seteens, which are designed for 1.5 times flow. Well effluent flows through the sereens, stopping solids larger than the perforations from being processed down the flow scheme to the choke manifold. Screens can be flushed clean, and removed from the plug catcher and replaced with new screens as needed, Covenant Plug Catchers come in dual leg configurations. Dual legs allow flow to be switched from one leg to the other for various mill out process, thus allowing continuous, uninterrupted flow of the well. A 2 inch bypass line runs down the centre of the catcher if needed. Working Pressure psi Screens Per Tube Slots Per Screen Slot Size Style soe tee caeetias Valve Type Connection Inlet Connection Outlet Dimensions LxWxH Weight Ibs Ps seme 3" Trash/Plug Catcher 15,000 3 3° x3/16" Dual Tube 250 Plug Valve 3° 1502 2° 1502 8.28" x 5.55" x 2.9" 3,000 ‘Copyright @ 2014 Covenant Testing Technologies, LLC. All rights reserved. COVENANT hed Eevee ae

Potrebbero piacerti anche