Control
using monitored
information to align
actual performance with
the plan
Closed loop
process
Planningmonitoringcontrolling
effort often
minimized to
spend time
on the real
work
Plan-monitor-control
Plan-monitor-control
Plan-Monitor-Control Cycle
Designing the
monitoring
system
Identify special characteristics of
performance, cost, and time that
need to be controlled
performance characteristics should
be set for each level of detail in the
project
Formats of Data
Frequency Counts
- complaints, number of time project is
late, days without accident etc.
Raw Numbers
-Dates, dollars, hours, physical amount
of resources etc.
Subjective Numeric Ratings
- Ranking of a quality
Indicators
- Response to change
Verbal Characterizations
- quality of team member cooperation,
morale of team members etc.