QUALITY ASSURANCE & INSPECTION TEST PLAN

ITP Number:APF-QAP- 05
Item Number : 1 - 5
Type of Pipe:CS Semaless
Customer Spec: A106 GR B

No:

Supplier: Arrow Overseas


Description of material : A/SA106 GR B
PO No: SSTS PURCHA15082617440

Client Name : STS LLC


DATE 30-08-2015

Type of Participation

Description of
Inspection /test
activity

Responsiible
Party

Appropriate Method / Procedure (Type of


participation)

Acceptance
Criteria

Record Document

PO Copy

QA Dept

-----------

--------

-----------

APF

Heat No: / Material Certificate Review


P.O, Related
Mill Test
Verified Chemical
Material Spec:
Certificates
Composition & mechanical properties
Shipping Mark and surface coating
Mill Test
Diameter ,wall
Related
Certificates & API
thickness,bevel ends ,length surface
Material Spec:
5L Spec.
defects,dents

2 Material Identification

QA Dept

Visual & dimensional


Inspection

QA Dept

Sample Identification

TPI

TPI Hard stamp on each heat / each item

--------

Lab test witness

TPI

Witnessing of chemical and mechanical tests

Related
Material Spec:

Chemical Analysis

QA Dept

C,Mn,Si,P,S,Cu,Cr,Ni,Mo,V,Nb & Ti + CEV

Remark
TPI

STS
H

--------

--------

WR

WR

WR

A106 GR B
7

Mechanical property

QA Dept

Tensile Test
Lab Test Report &
Mill Test
Certificates

Hardness

QA Dept

Hardness as per NACE MR 01 75

22 HRC Max

Flattening / bend test

QA Dept

2" & below bend test / above 2" flattening test

A106 / API 5L

WR

10

Impact test

QA Dept

only for psl2 materials

API 5L GR
B /X42 PSL2

WR

10

Final Document
Review & IRN

TPI

correlation Of TC with material


Lab reports review

Customer
Spec

packing list

R:-Review

IRN : Inspection Release Note

W:-Witness

TPI: Third Party Inspector

RI:Random Inspection

APF : Arrow Pipes & Fittings Fzco

H:- Hold

QA : Quality Assurance

I: Inspection All Materials

Prepared By

Reviewed By

Approved By

ARROW PIPES & FITTINGS FZCO


PO BOX.17574 ,JEBEL ALI ,DUBAI-U.A.E.
PHONE:00971-4-8832300 , FAX:00971-4-8832301
APF-QAP - 005

QA PROCEDURE

Q.A.P.
QUALITY ASSURANCE PLAN
FOR

STS

15th Dec 2009

For Approval

Palaniappan

Tenson

15th Dec 2009

For Approval

Palaniappan

Tenson

Rev No:

Rev Date

Reason for Issue

Prepared By

Approved By

Client

Potrebbero piacerti anche