CANTIDAD
PRECIO
PARCIAL
1,818.65
m2
9.00
80.10
720.90
mes
1.00
150.00
150.00
1.00
947.75
947.75
236.25
1.63
385.09
236.25
1.58
373.28
789.87
2 OBRAS PRELIMINARES
758.36
m2
m2
3 MOVIMIENTO DE TIERRAS
10,056.37
m3
33.54
23.55
m2
47.25
9.29
438.95
m3
38.26
28.76
1100.36
m2
226.05
9.95
2249.20
m2
249.00
22.00
5478.00
19,980.39
m3
20.00
155.21
3104.20
m2
93.00
34.44
3202.92
m2
51.05
19.88
1014.87
m2
280.00
43.89
12289.20
52.00
7.10
369.20
7,543.84
05.01.01
m3
8.00
321.24
2569.92
05.01.02
ENCOFRADO Y DESENCOFRADO
m2
98.17
34.44
3380.97
05.01.03
kg
231.87
6.87
1592.95
5.02 SARDINELES
3,575.47
05.02.01
m2
38.40
43.32
1663.49
05.02.02
m3
2.88
321.24
925.17
05.02.03
kg
143.64
6.87
986.81
166.41
19.23
3200.06
51.05
42.97
2193.62
203.46
6.65
1353.01
1.00
2000.00
2000.00
3,200.06
m2
7 PISOS Y PAVIMENTOS
7.01 BLOQUES DE CONCRETO DE COLORES
2,193.62
m2
8 PINTURA
8.01 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS
1,353.01
m2
9 CARPINTERIA DE MADERA
9.01 PORTADA DE MADERA
2,000.00
glb
10 CARPINTERIA METALICA
16,794.71
4.00
250.00
1000.00
1.00
3500.00
3500.00
1.00
1700.00
1700.00
1.00
4500.00
4500.00
10.05 CASTILLO
1.00
1550.00
1550.00
10.06 BALANZA
1.00
2000.00
2000.00
1.00
650.00
650.00
10.08 PASAMANOS
1.00
450.00
450.00
3.00
481.57
1444.71
11 INSTALACIONES ELECTRICAS
3,650.73
11.01 SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + D PVC SEL 16 mm (5/8)
pto
5.00
91.92
459.60
1.00
513.49
513.49
85.00
11.59
5.00
78.19
390.95
118.00
11.03
1301.54
180.00
23.51
4231.80
9.00
20.00
180.00
18.00
12.92
232.56
12 JARDINERIA
985.15
4644.36
m2
12.02 PLANTONES
m2
13 VARIOS
350.00
glb
1.00
0.00
0.00
glb
1.00
350.00
350.00
SUB TOTAL
GASTOS GENERALES
TOTAL
SON :
77,919.58
10%
7,791.96
85,711.54
CUADRO DE METRADOS
OBRA
UBICACIN
SECTOR :
NUEVO ACARI
PROVINCIA
CARAVELI
DISTRITO :
ACARI
DEPARTAMENTO:
AREQUIPA
ANCHO
FECHA
ITEM
DESCRIPCION
ALTO
PARCIAL
TOTAL
OBRAS PROVISIONALES
CONSTRUCCION DE ALMACEN Y CASETA DE GUARDIANIA
01.02
01.03
18.00
18.00
1.00
1.00
1.00
UND
1.00
1.00
1.00
M2
1.00
MES
6.00
3.00
02
OBRAS PRELIMINARES
02.01
TRAZO Y REPLANTEO
M2
1.00
37.00
21.37
790.69
790.69
02.02
M2
1.00
37.00
21.37
790.69
790.69
03
03.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
MUROS
SARDINEL INTERIOR
SARDINEL VEREDA
1.00
1.00
2.00
2.00
2.00
3.00
14.00
BANCA DE CONCRETO
FAROL DE PIE
03.02
33.54
M3
73.00
90.00
17.50
13.50
20.00
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.40
0.40
03.04
47.25
04
04.03
47.25
38.26
1.20
38.26
51.05
25.50
7.50
37.00
21.37
1.50
1.50
1.50
1.50
51.05
76.50
22.50
111.00
64.11
24.00
0.45
0.60
6.48
2.00
3.46
0.45
0.60
1.87
1.00
16.34
0.45
0.60
4.41
MURO PERGOLA
8.00
0.60
0.60
0.10
0.29
PEDESTAL
8.00
0.40
0.40
0.60
0.77
MURO PERGOLA
8.00
2.50
0.25
5.00
PEDESTAL
8.00
1.60
0.60
7.68
1.00
31.88
1.00
2.00
2.00
2.00
2.00
1.00
325.16
M2
M3
04.02
0.20
M3
VEREDAS PERIMETRICAS
04.01
14.60
8.10
3.15
2.43
3.60
0.31
1.34
M3
area= 236.25 m2
03.03
0.50
0.30
0.30
0.30
0.30
0.65
0.60
13.82
12.68
M2
51.05
M2
AREA
51.05
51.05
04.04
VEREDAS PERIMETRICAS
04.05
05
05.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
JUNTAS DE DILATACION
06
06.01
6.02
07
07.01
08
08.01
8.02
25.50
7.50
37.00
21.37
longitud
52.00
2.00
2.00
2.00
2.00
7.10
13.20
9.00
12.00
76.50
22.50
111.00
64.11
1.50
1.50
1.50
1.50
52.00
52.00
16.36
M3
ENCOFRADO Y DESENCOFRADO
0.20
0.20
0.20
0.20
1.35
1.35
1.10
0.30
3.83
7.13
3.96
1.44
98.17
M2
2.00
7.10
1.35
19.17
2.00
13.20
1.35
35.64
2.00
9.00
1.10
19.80
2.00
12.00
0.30
7.20
1.00
0.56
414.05
231.87
2.00
4.00
4.00
4.00
90.00
17.50
13.50
20.00
0.30
0.30
0.30
0.30
54.00
21.00
16.20
24.00
1.00
2.00
2.00
2.00
90.00
17.50
13.50
20.00
0.10
0.10
0.10
0.10
1.35
0.53
0.41
0.60
1.00
0.56
MUROS
2.00
2.00
2.00
2.00
7.10
13.20
9.00
12.00
1.35
1.35
1.10
0.30
19.17
35.64
19.80
7.20
SARDINEL INTERIOR
SARDINEL VEREDA
4.00
4.00
4.00
165.00
17.50
13.50
0.30
0.30
0.30
198.00
21.00
16.20
4.00
20.00
0.30
24.00
AREA
51.05
2.00
2.00
2.00
2.00
7.10
13.20
9.00
12.00
1.35
1.35
1.10
0.30
19.17
35.64
19.80
7.20
2.00
90.00
0.30
54.00
231.87
KG
SARDINELES
ENCOFRADO Y DESENCOFRADO h=0.30 m CARAVISTA
38.40
M2
2.88
M3
SARDINEL INTERIOR
SARDINEL VEREDA
05.02.03
2.00
2.00
2.00
2.00
M2
SARDINEL INTERIOR
SARDINEL VEREDA
05.02.02
274.11
M2
VEREDA INTERIOR
0.15
0.15
0.15
0.15
143.64
Kg
256.50
143.64
81.81
M2
PISOS Y PAVIMENTOS
BLOQUES DE CONCRETO DE COLORES
51.05
M2
PINTURA
PINTURA VINILICA EN MUROS INTERIORES Y EXTERIORES 2 MANOS
MUROS
M2
M2
SARDINEL INTERIOR
259.20
81.81
SARDINEL VEREDA
2.00
2.00
2.00
17.50
13.50
20.00
0.30
0.30
0.30
10.50
8.10
12.00
EN COLUMNAS DE LA PERGOLA
2.00
2.95
6.28
37.05
75.75
09
09.01
CARPINTERIA DE MADERA
PERGOLA DE MADERA
GLB
1.00
10
10.01
CARPINTERIA METALICA
PAPELERA DE FIERRO LAMINADO
UND
6.00
6.00
6.00
10.02
RUEDA GIRATORIA
UND
1.00
1.00
1.00
10.03
UND
1.00
1.00
1.00
10.04
JUEGO MULTIPLE
UND
1.00
1.00
1.00
10.05
CASTILLO
UND
1.00
1.00
1.00
10.06
BALANZA
UND
1.00
1.00
1.00
10.07
BARRAS PARALELAS
UND
1.00
1.00
1.00
10.08
PASAMANOS
UND
1.00
1.00
1.00
10.09
UND
16.00
1.00
16.00
10.10
UNID.
82.00
82.00
82.00
10.11
ML.
172.00
172.00
172.00
11
1.00
INSTALACIONES ELECTRICAS
11.01
SALIDA DE TECHO CON CABLE AWG 2.5 mm2 PARA CENTRO DE LUZ
PTO
5.00
5.00
11.02
TABLERO ELECTRICO
UND
1.00
1.00
11.03
11.04
11.05
1.00
UND
24.00
24.00
140.00
1.00
140.00
8.00
POSTES COLONIALES
UNID.
8.00
JARDINERIA
SEMBRADO DE GRASS
POSA N 01
M2
M2
2.00
27.50
POSA N 02
M2
2.00
26.00
POSA N 03
M2
2.00
28.73
UND
6.00
6.00
6.00
M2
10.00
10.00
10.00
12.02
PLANTONES FICUS
12.03
SEMBRADO DE FLORES
13
116.00
ML
ALIMENTACION DE POSTES
12
12.01
116.00
ML
ALIMENTACION DE POSTES
55.00
52.00
57.46
164.46
VARIOS
13.01
FLETE TERRESTRE
GLB
1.00
1.00
1.00
13.02
PINTURA DE PERGOLA
GLB
1.00
1.00
1.00