Sei sulla pagina 1di 5

OBRA CONSTRUCCION DE PARQUE INFANTIL

ACARI - CARAVELI - AREQUIPA


AGOSTO DEL 2008
UNID.
1.00 OBRAS PROVISIONALES

CANTIDAD

PRECIO

PARCIAL

1,818.65

1.01 CONSTRUCCION DE ALMACEN, CASETA DE GUARDIANIA

m2

9.00

80.10

720.90

1.02 AGUA PARA LA CONSTRUCCION

mes

1.00

150.00

150.00

1.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

1.00

947.75

947.75

236.25

1.63

385.09

236.25

1.58

373.28
789.87

2 OBRAS PRELIMINARES

758.36

2.01 TRAZO Y REPLANTEO

m2

2.02 LIMPIEZA DE TERRENO MANUAL

m2

3 MOVIMIENTO DE TIERRAS

10,056.37

3.01 EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

33.54

23.55

3.02 CORTE O RELLENO DE TERRENO HASTA 0.20 m

m2

47.25

9.29

438.95

3.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA

m3

38.26

28.76

1100.36

3.04 AFIRMADO COMPACATADO DE 4" PISOS Y VEREDAS

m2

226.05

9.95

2249.20

3.05 DEMOLICIN DE STRUCTURA EXISTENTE

m2

249.00

22.00

5478.00

4 OBRAS DE CONCRETO SIMPLE

19,980.39

4.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

20.00

155.21

3104.20

4.02 ENCOFRADO Y DESENCOFRADO

m2

93.00

34.44

3202.92

4.03 FALSO PISO DE 4" DE CONCRETO 1:8

m2

51.05

19.88

1014.87

4.04 VEREDA DE CONCRETO DE 4"

m2

280.00

43.89

12289.20

4.05 JUNTAS DE DILATACION

52.00

7.10

369.20

5 OBRAS DE CONCRETO ARMADO


5.01 CONCRETO ARMADO PARA MURO

7,543.84

05.01.01

CONCRETO f 'c=210 kg/cm2

m3

8.00

321.24

2569.92

05.01.02

ENCOFRADO Y DESENCOFRADO

m2

98.17

34.44

3380.97

05.01.03

ACERO fy=4200 kg/cm2

kg

231.87

6.87

1592.95

5.02 SARDINELES

3,575.47

05.02.01

ENCOFRADO Y DESENCOFRADO h=0.20 m (CARAVISTA)

m2

38.40

43.32

1663.49

05.02.02

CONCRETO f 'c=210 kg/cm2 PARA SARDINELES

m3

2.88

321.24

925.17

05.02.03

ACERO fy=4200 kg/cm2

kg

143.64

6.87

986.81

166.41

19.23

3200.06

51.05

42.97

2193.62

203.46

6.65

1353.01

1.00

2000.00

2000.00

6 REVOQUES ENLUCIDOS Y MOLDURAS


6.01 TARRAJEO DE SUPERFICIE DE CONCRETO

3,200.06
m2

7 PISOS Y PAVIMENTOS
7.01 BLOQUES DE CONCRETO DE COLORES

2,193.62
m2

8 PINTURA
8.01 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS

1,353.01
m2

9 CARPINTERIA DE MADERA
9.01 PORTADA DE MADERA

2,000.00
glb

10 CARPINTERIA METALICA

16,794.71

10.01 PAPELERA DE FIERRO LAMINADO

4.00

250.00

1000.00

10.02 RUEDA GIRATORIA

1.00

3500.00

3500.00

10.03 COLUMPIO PARA CUATRO PERSONAS

1.00

1700.00

1700.00

10.04 JUEGO MULTIPLE

1.00

4500.00

4500.00

10.05 CASTILLO

1.00

1550.00

1550.00

10.06 BALANZA

1.00

2000.00

2000.00

10.07 BARRAS PARALELAS

1.00

650.00

650.00

10.08 PASAMANOS

1.00

450.00

450.00

10.09 BANCAS DE CONCRETO CON APOYO DE TUBO FG 1-1/2"

3.00

481.57

1444.71

11 INSTALACIONES ELECTRICAS

3,650.73

11.01 SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + D PVC SEL 16 mm (5/8)

pto

5.00

91.92

459.60

11.02 TABLERO ELECTRICO

1.00

513.49

513.49

11.03 TUBERIAS PVC SAP (ELECTRICAS) D=1"

85.00

11.59

11.04 ARTEFACTO FLUORECENTE 1/18W

5.00

78.19

390.95

11.05 CABLE ELECTRICO NYY 3 X 4 mm2

118.00

11.03

1301.54

180.00

23.51

4231.80

9.00

20.00

180.00

18.00

12.92

232.56

12 JARDINERIA

985.15

4644.36

12.01 SEMBRADO DE GRAS

m2

12.02 PLANTONES

12.03 SEMBRADO DE FLORES

m2

13 VARIOS

350.00

13.01 FLETE TERRESTRE

glb

1.00

0.00

0.00

13.02 PINTURA DE JUEGO DE DAMAS Y MUNDO

glb

1.00

350.00

350.00

SUB TOTAL
GASTOS GENERALES
TOTAL
SON :

OCHENTICINCO MIL SETECIENTOS SETENTIUN Y 54/100 NUEVOS SOLES

77,919.58
10%

7,791.96
85,711.54

CUADRO DE METRADOS
OBRA

CONSTRUCCION DE LA PLAZUELA Y PARQUE INFANTIL ACARI

UBICACIN

SECTOR :

NUEVO ACARI

PROVINCIA

CARAVELI

DISTRITO :

ACARI

DEPARTAMENTO:

AREQUIPA

UND N VECES LARGO

ANCHO

FECHA

JULIO DEL 2009

ITEM

DESCRIPCION

ALTO

PARCIAL

TOTAL

CONSTRUCCION DE PARQUE INFANTIL ACARI


01
01.01

OBRAS PROVISIONALES
CONSTRUCCION DE ALMACEN Y CASETA DE GUARDIANIA

01.02
01.03

18.00

18.00

1.00

1.00

1.00

UND

1.00

1.00

1.00

M2

1.00

AGUA PARA LA CONSTRUCCION

MES

CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 m

6.00

3.00

02

OBRAS PRELIMINARES

02.01

TRAZO Y REPLANTEO

M2

1.00

37.00

21.37

790.69

790.69

02.02

LIMPIEZA DE TERRENO MANUAL

M2

1.00

37.00

21.37

790.69

790.69

03
03.01

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
MUROS
SARDINEL INTERIOR
SARDINEL VEREDA

1.00
1.00
2.00
2.00
2.00
3.00
14.00

BANCA DE CONCRETO
FAROL DE PIE
03.02

33.54

M3

CORTE O RELLENO DE TERRENO HASTA 0.20 mt

73.00
90.00
17.50
13.50
20.00
0.40
0.40

0.40
0.30
0.30
0.30
0.30
0.40
0.40

03.04

ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA

47.25

04

04.03

47.25

38.26
1.20

38.26

51.05
25.50
7.50
37.00
21.37

1.50
1.50
1.50
1.50

51.05
76.50
22.50
111.00
64.11

24.00

0.45

0.60

6.48

2.00

3.46

0.45

0.60

1.87

1.00

16.34

0.45

0.60

4.41

MURO PERGOLA

8.00

0.60

0.60

0.10

0.29

PEDESTAL

8.00

0.40

0.40

0.60

0.77

MURO PERGOLA

8.00

2.50

0.25

5.00

PEDESTAL

8.00

1.60

0.60

7.68

AFIRMADO COMPACTADO DE 4" EN PISOS Y VEREDAS


EN PISO DE ADOQUIN CON CONCRETO DE PIEDRA
VEREDA INTERIOR

1.00

31.88

1.00
2.00
2.00
2.00
2.00

1.00

325.16

M2

OBRAS DE CONCRETO SIMPLE


CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

M3

CIMIENTO DE MUROS DE CONCRETO

04.02

0.20

M3

VEREDAS PERIMETRICAS

04.01

14.60
8.10
3.15
2.43
3.60
0.31
1.34

M3
area= 236.25 m2

03.03

0.50
0.30
0.30
0.30
0.30
0.65
0.60

ENCOFRADO Y DESENCOFRADO PERGOLA

13.82

12.68

M2

FALSO PISO DE 4" DE CONCRETO 1:8


EN PISO PARA ADOQUIN CONCRETO DE PIEDRA

51.05

M2
AREA

51.05

51.05

04.04

VEREDA DE CONCRETO DE 4"

VEREDAS PERIMETRICAS

04.05

05
05.01
05.01.01

05.01.02

05.01.03

05.02
05.02.01

JUNTAS DE DILATACION

06
06.01

6.02

07
07.01

08
08.01

8.02

25.50
7.50
37.00
21.37

longitud

52.00

2.00
2.00
2.00
2.00

7.10
13.20
9.00
12.00

76.50
22.50
111.00
64.11

1.50
1.50
1.50
1.50

52.00
52.00

OBRAS DE CONCRETO ARMADO


CONCRETO ARMADO PARA MURO
CONCRETO F'C=210KG/CM2 CERCO DE PERGOLA

16.36

M3

ENCOFRADO Y DESENCOFRADO

0.20
0.20
0.20
0.20

1.35
1.35
1.10
0.30

3.83
7.13
3.96
1.44

98.17

M2
2.00

7.10

1.35

19.17

2.00

13.20

1.35

35.64

2.00

9.00

1.10

19.80

2.00

12.00

0.30

7.20

1.00

0.56

414.05

231.87

2.00
4.00
4.00
4.00

90.00
17.50
13.50
20.00

0.30
0.30
0.30
0.30

54.00
21.00
16.20
24.00

1.00
2.00
2.00
2.00

90.00
17.50
13.50
20.00

0.10
0.10
0.10
0.10

1.35
0.53
0.41
0.60

1.00

0.56

MUROS

2.00
2.00
2.00
2.00

7.10
13.20
9.00
12.00

1.35
1.35
1.10
0.30

19.17
35.64
19.80
7.20

SARDINEL INTERIOR
SARDINEL VEREDA

4.00
4.00
4.00

165.00
17.50
13.50

0.30
0.30
0.30

198.00
21.00
16.20

4.00

20.00

0.30

24.00

AREA

51.05

2.00
2.00
2.00
2.00

7.10
13.20
9.00
12.00

1.35
1.35
1.10
0.30

19.17
35.64
19.80
7.20

2.00

90.00

0.30

54.00

ACERO fy=4200 kg/cm2

231.87

KG

SARDINELES
ENCOFRADO Y DESENCOFRADO h=0.30 m CARAVISTA

38.40

M2

CONCRETO F'C=210KG/CM2 - PARA SARDINELES

2.88

M3
SARDINEL INTERIOR
SARDINEL VEREDA

05.02.03

2.00
2.00
2.00
2.00
M2

SARDINEL INTERIOR
SARDINEL VEREDA

05.02.02

274.11

M2
VEREDA INTERIOR

ACERO PARA SARDINELES

0.15
0.15
0.15
0.15

143.64

Kg
256.50

143.64

REVOQUES ENLUCIDOS Y MOLDURAS PERGOLA


TARRAJEO DE SUPERFICIE DE CONCRETO

81.81

M2

TARRAJEO DE SARDINEL DE CONCRETO

PISOS Y PAVIMENTOS
BLOQUES DE CONCRETO DE COLORES

51.05

M2

PINTURA
PINTURA VINILICA EN MUROS INTERIORES Y EXTERIORES 2 MANOS
MUROS

M2

PINTURA ESMALTE EN SARDINEL 2 MANOS

M2
SARDINEL INTERIOR

259.20

81.81

SARDINEL VEREDA

2.00
2.00
2.00

17.50
13.50
20.00

0.30
0.30
0.30

10.50
8.10
12.00

EN COLUMNAS DE LA PERGOLA

2.00

2.95

6.28

37.05

75.75

09
09.01

CARPINTERIA DE MADERA
PERGOLA DE MADERA

GLB

1.00

10
10.01

CARPINTERIA METALICA
PAPELERA DE FIERRO LAMINADO

UND

6.00

6.00

6.00

10.02

RUEDA GIRATORIA

UND

1.00

1.00

1.00

10.03

COLUMPIO PARA 4 PERSONAS

UND

1.00

1.00

1.00

10.04

JUEGO MULTIPLE

UND

1.00

1.00

1.00

10.05

CASTILLO

UND

1.00

1.00

1.00

10.06

BALANZA

UND

1.00

1.00

1.00

10.07

BARRAS PARALELAS

UND

1.00

1.00

1.00

10.08

PASAMANOS

UND

1.00

1.00

1.00

10.09

BANCAS DE METAL CON ASIENTO Y RESPALADR DE MADERA

UND

16.00

1.00

16.00

10.10

POSTE PEDESTAL PROTECOTRA DE JARDIN

UNID.

82.00

82.00

82.00

10.11

CADENA PROTECTORA DE JARDIN E=1"

ML.

172.00

172.00

172.00

11

1.00

INSTALACIONES ELECTRICAS

11.01

SALIDA DE TECHO CON CABLE AWG 2.5 mm2 PARA CENTRO DE LUZ

PTO

5.00

5.00

11.02

TABLERO ELECTRICO

UND

1.00

1.00

11.03

TUBERIAS PVC SAP ELECTRICAS DE 1"

11.04

ARTEFACTO LUMINARIO 1 LAMP 18W

11.05

CABLE ELECTRICO NYY 3x 4mm2

1.00
UND

24.00

24.00

140.00
1.00

140.00

8.00

POSTES COLONIALES

UNID.

8.00

JARDINERIA
SEMBRADO DE GRASS
POSA N 01

M2
M2

2.00

27.50

POSA N 02

M2

2.00

26.00

POSA N 03

M2

2.00

28.73

UND

6.00

6.00

6.00

M2

10.00

10.00

10.00

12.02

PLANTONES FICUS

12.03

SEMBRADO DE FLORES

13

116.00

ML
ALIMENTACION DE POSTES

12
12.01

116.00

ML
ALIMENTACION DE POSTES

55.00
52.00
57.46
164.46

VARIOS

13.01

FLETE TERRESTRE

GLB

1.00

1.00

1.00

13.02

PINTURA DE PERGOLA

GLB

1.00

1.00

1.00

Potrebbero piacerti anche