Sei sulla pagina 1di 1

Lc

LIST OF DRAWINGS
BEAM HEIGHT
L1

SHEET NO.

L2

SHEET TITLE
COVER SHEET

S-01

GENERAL NOTES

S-02

FLOOR FRAMING PLANS

S-03

CONCRETE COLUMN SCHEDULE

S-04

CONCRETE BEAM SCHEDULE (SEISMIC) (1 OF 2)

S-05

CONCRETE BEAM SCHEDULE (SEISMIC) (2 OF 2)

S-00

ZONE A

S-06

CONCRETE COLUMN LAYOUT

S-07

WALL LAYOUT

S-08

WALL REINFORCEMENT ELEVATIONS (1 OF 2)

S-09

WALL REINFORCEMENT ELEVATIONS (2 OF 2)

S-10

WALL REINFORCEMENT PLANS (1 OF 2)

S-11

WALL REINFORCEMENT PLANS (2 OF 2)

ZONE B

ZONE C

ZONE B

ZONE A

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

Typical Concrete Beam Elevation 1S

Lc1

Lc2

BEAM HEIGHT

BEAM HEIGHT

L1

L2

L1

L2

h
G

TYPICAL LAP
(SEE NOTE 5)

ZONE A

ZONE B

TYPICAL LAP
(SEE NOTE 5)

ZONE C

ZONE B

ZONE A

ZONE A

ZONE B

ZONE C

ZONE B

ZONE A

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

Typical Concrete Beam Elevation 2S

Lc1

Lc2

BEAM HEIGHT

L2

L1

L2

8/12/2015

BEAM HEIGHT

L1

DATE

NEW DRAWING GENERATED

L2

DESCRIPTION

LcN

BEAM HEIGHT

L1

NO

DRAWING
G

TYPICAL LAP
(SEE NOTE 5)

ZONE A

ZONE B

TYPICAL LAP
(SEE NOTE 5)

ZONE C

ZONE B

ZONE A

ZONE A

ZONE B

ZONE C

TYPICAL LAP
(SEE NOTE 5)

ZONE B

ZONE A

ZONE A

ZONE B

ZONE C

GENERAL NOTES - 1
ZONE B

ZONE A

STRUCTURE

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.

MODEL

4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

Typical Concrete Beam Elevation 3S

PROJECT

Width

Width

Width

Beam Section-A

Depth

Depth

Depth

CLIENT

Beam Section-B

CONSULTANT

Beam Section-C

PROJECT NUMBER
DATE
DESIGNED BY
CHECKED BY

S-01
SCALE

Potrebbero piacerti anche