MANO DE OBRA

Item

Descripcin

Und.

Metrado

Precio (S/.)

Parcial (S/.)

47

I.U.
1 01

OBRAS PRELIMINARES
CARTEL DE OBRA

und

1.00

685.40

685.40

0 01.02

ALQUILER PARA OFICINA Y ALMACEN DE OBRA

GLB

1.00

900.00

900.00
12,327.04
214.20
94.50

0 02.01.02
0 02.02

CAPTACION (03 UNID)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO

m2

90.00

1.05

m2

90.00

1.33

MOVIMIENTO DE TIERRAS

180.00

119.70
317.18

0 02.02.01

EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL

m3

8.71

28.25

246.06

0 02.02.02

RELLENO CON MATERIAL PROPIO

m3

5.18

13.73

71.12

0 02.03

47

1,585.40

0 01.01
2 02
0 02.01
0 02.01.01

OPERARIO OFICIAL

OBRAS DE CONCRETO SIMPLE

89.63

1,419.22

0 02.03.01

CONCRETO SIMPLE FC=140 KG/CM2

m3

1.16

407.47

472.67

23.20

20.88

0 02.03.02

CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM

m3

7.72

122.61

946.55

24.70

22.23
29.92

0 02.04

OBRAS DE CONCRETO ARMADO

3,968.45

0 02.04.01

CONCRETO FC=175 KG/CM2

m3

3.74

336.52

1,258.58

16.61

0 02.04.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

30.79

20.98

645.97

40.95

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

474.46

4.35

2,063.90

189.78

170.81

262.60

236.22

48.00

43.20

0 02.04.03
0 02.05
0 02.05.01
0 02.06
0 02.06.01
0 02.07

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO (MORTERO 1:3 e=1.5cm)

698.82
m2

39.37

17.75

INSTALACIONES DE ACCESORIOS
INSTALACIONES DE ACCESORIOS

698.82
1,414.23

GLB

3.00

471.41

CARPINTERIA METALICA

1,414.23
649.98

0 02.07.01

INSTALACION DE TAPA METALICA 60X60cm

und

3.00

108.33

324.99

60.00

0 02.07.02

INSTALACION DE TAPA METALICA 40X40cm

und

3.00

108.33

324.99

60.00

0 02.08
0 02.08.01
0 02.08.01.01
0 02.08.02

CERCO PERIMETRICO DE SEGURIDAD

3,644.96

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

43.89
m2

33.00

1.33

MOVIMIENTO DE TIERRAS

43.89
86.23

0 02.08.02.01

EXCAVACION MANUAL TERRENO NORMAL

m3

1.62

28.25

45.77

0 02.08.02.02

ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M

m3

2.03

19.93

40.46

0 02.08.03
0 02.08.03.01
0 02.08.04

CONCRETO SIMPLE
CONCRETO FC=140 KG/CM2

660.10
m3

COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50

und

ALAMBRE DE PUAS N 12

COLOCADO DE PUERTA CON MARCO DE MADERA

und

0 03.01
0 03.01.01
0 03.02

407.47

36.00

44.13

1,588.68

330.00

1.51

498.30

3.00

255.92

RESERVORIO NOCTURNO 216 M3 (01 UND)


126.00

1.05

MOVIMIENTO DE TIERRAS
m3

189.00

28.25

5,339.25

m2

126.00

5.49

691.74

ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M

m3

236.25

19.93

4,708.46

m3

12.60

263.01

0 03.04

72.00

132.30

REFINE, NIVELACION Y COMPACTACION


CONCRETO SIMPLE
SOLADO DE CONCRETO C:H 1:10 E=0.10M

288.00

10,739.45

EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL

0 03.03.01

320.04

132.30
m2

0 03.02.02
0 03.03

29.16

767.76

0 03.02.01
0 03.02.03

32.40

62,406.92

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

660.10
2,854.74

0 02.08.04.02
3 03

1.62

COLOCACION DE CERCO PERIMETRICO

0 02.08.04.01
0 02.08.04.03

16.67

1944.81

3,313.93

CONCRETO ARMADO

3,313.93

100.80

90.72

35,474.02

0 03.04.01

CONCRETO FC=210 KG/CM2

m3

64.56

430.28

27,778.88

1032.96

929.66

0 03.04.02

ENCOFRADO Y DESENCOFRADO DE MUROS

m2

179.76

26.28

4,724.09

1026.43

923.97

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

683.00

4.35

2,971.05

273.20

245.88

0 03.04.03
0 03.05

REVESTIMIENTO Y JUNTAS

7,163.68

0 03.05.01

TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO

m2

88.20

34.30

3,025.26

503.62

0 03.05.02

TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA

m2

104.00

34.30

3,567.20

593.84

0 03.05.03

WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA

12.60

5.08

64.01

21.04

BRUA DE DILATACION CON ASFALTO E=1"

87.00

5.83

507.21

0 03.05.04
0 03.06

OTRAS PARTIDAS

125.28

861.80

0 03.06.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS

GLB

1.00

422.10

422.10

80.00

0 03.06.02

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS

GLB

1.00

439.70

439.70

80.00

0 03.07
0 03.07.01
0 03.07.01.01
0 03.07.02

CERCO PERIMETRICO DE SEGURIDAD

4,721.74

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

62.19
m2

46.76

1.33

MOVIMIENTO DE TIERRAS

62.19
163.61

0 03.07.02.01

EXCAVACION PARA ZAPATAS EN TERRENO NORMAL

m3

4.12

18.00

74.16

0 03.07.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

1.42

13.73

19.50

72.00

0 03.07.02.03
0 03.07.03

ELIMINACION DE MATERIAL DE EXCAVACION D>50m

m3

3.51

19.93

OBRAS DE CONCRETO ARMADO

69.95
1,764.86

0 03.07.03.01

CONCRETO FC=175 KG/CM2

m3

4.63

336.52

1,558.09

20.56

0 03.07.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

2.52

20.98

52.87

3.35

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

35.38

4.35

153.90

14.15

12.74

20.00

36.00

0 03.07.03.03
0 03.07.04
0 03.07.04.01
4 04
0 04.01
0 04.01.01
0 04.02

INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO


INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO

2,731.08
GLB

1.00

2,731.08

LINEA DE CONDUCCION TUB. PVC L = 534.00 ML

2,731.08
11,948.55

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

710.22
m2

534.00

1.33

MOVIMIENTO DE TIERRAS

710.22
6,820.89

0 04.02.01

EXCAVACION MANUAL EN TERRENO NORMAL

m3

170.88

17.65

3,016.03

0 04.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

534.00

0.62

331.08

0 04.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)

534.00

2.74

1,463.16

0 04.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

21.36

11.75

250.98

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

128.16

13.73

1,759.64

INSTALACION DE TUBERIA 3" PVC C-7.5

534.00

7.02

3,748.68

192.24

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

534.00

1.09

582.06

170.88

0 04.02.05
0 04.03
0 04.03.01
0 04.03.02
0 04.04
0 04.04.01
5 05
0 05.01
0 05.01.01
0 05.02

INSTALACION DE TUBERIAS PVC

86.70
GLB

1.00

86.70

LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML)

86.70
3,100.23

m2

2,331.00

1.33

745.92

17.65

13,165.49

MOVIMIENTO DE TIERRAS

3,100.23
55,701.58

0 05.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

0 05.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

2,331.00

0.62

1,445.22

0 05.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)

2,331.00

2.74

6,386.94

0 05.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

93.24

11.75

1,095.57

RELLENO CON MATERIAL PROPIO

m3

1,398.60

24.03

0 05.02.05
0 05.03

4.00

77,676.60

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

192.24
24.35

4,330.74

INSTALACION DE ACCESORIOS
INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION

INSTALACION DE TUBERIAS PVC

839.16
106.29

33,608.36 13986.00
18,551.19

0 05.03.01

INSTALACION DE TUBERIA 3" PVC C-7.5

1,490.00

7.02

10,459.80

536.40

0 05.03.02

INSTALACION DE TUBERIA 2" PVC C-7.5

841.00

6.60

5,550.60

302.76

0 05.03.03

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

2,331.00

1.09

2,540.79

745.92

0 05.04
0 05.04.01
6 06
0 06.01
0 06.01.01

INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION

323.60
GLB

1.00

323.60

LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML)

323.60
124,604.13

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

37.04

4,838.54
m2

3,638.00

1.33

4,838.54

80.00

72.00

0 06.02

MOVIMIENTO DE TIERRAS

92,759.90

0 06.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

1,164.16

17.65

0 06.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

3,638.00

0.62

2,255.56

0 06.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm)

3,638.00

3.14

11,423.32

0 06.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

145.52

11.75

1,709.86

RELLENO CON MATERIAL PROPIO

m3

2,364.70

24.03

0 06.02.05
0 06.03

INSTALACION DE TUBERIAS PVC

20,547.42
1637.10
165.89

56,823.74 23647.00
26,884.82

0 06.03.01

INSTALACION DE TUBERIA 1.5" PVC C-7.5

3,638.00

6.30

22,919.40

1309.68

0 06.03.02

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

3,638.00

1.09

3,965.42

1164.16

0 06.04
0 06.04.01
7 07
0 07.01
8 08
0 08.01
0 08.01.01
0 08.02
0 08.02.01
0 08.03

INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO

120.87
GLB

1.00

120.87

LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND)


SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVER

und

77.00

811.60

CABECERA DE RIEGO ( 3 UND)

62,493.20

616.00

11.37
m2

8.55

1.33

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

26.67

25,184.01

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

120.87
62,493.20

11.37
20,547.42

m3

1,164.16

17.65

OBRAS DE CONCRETO ARMADO

20,547.42
3,274.88

0 08.03.01

CONCRETO FC=175 KG/CM2

m3

5.73

336.52

1,928.26

25.44

0 08.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

24.48

20.98

513.59

32.56

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

191.50

4.35

833.03

76.60

68.94

172.89

155.52
36.00

0 08.03.03
0 08.04
0 08.04.01
0 08.05

ACABADOS
TARRAJEO (MEZCLA 1:3 e=1.5cm)

649.81
m2

25.92

25.07

INSTALACIONES DE ACCESORIOS

649.81
700.53

0 08.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO

GLB

3.00

120.85

362.55

39.99

0 08.05.02

INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8"

und

3.00

112.66

337.98

48.00

9 09
0 09.01
0 09.01.01
0 09.02
0 09.02.01
0 09.03

HIDRANTES ( 77 UND)

20,657.77

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

25.60
m2

19.25

1.33

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

25.60
203.86

m3

11.55

17.65

OBRAS DE CONCRETO SIMPLE

203.86
3,650.01

0 09.03.01

CONCRETO FC=175 KG/CM2

m3

7.39

336.52

2,486.88

32.81

0 09.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

55.44

20.98

1,163.13

73.74

m2

27.72

17.75

0 09.04
0 09.04.01
0 09.05
0 09.05.01

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

59.12

492.03

INSTALACION DE ACCESORIOS
SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2"

45.84

492.03

184.89

166.32

1026.41

924.00

16,286.27
und

77.00

108.85

8,381.45

0 09.05.02
10 10
0 10.01
0 10.01.01
0 10.02
0 10.02.01
0 10.03

INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8"

und

77.00

102.66

VALVULAS DE CONTRO (12 UND)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

1232.00

10.21
m2

7.68

1.33

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

7,904.82
10,894.89
10.21
108.37

m3

6.14

17.65

OBRAS DE CONCRETO ARMADO

108.37
6,039.55

0 10.03.01

CONCRETO FC=175 KG/CM2

m3

12.55

336.52

4,223.33

55.72

100.40

0 10.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

287.88

4.35

1,252.28

115.15

103.64

0 10.03.03

ENCOFRADO Y DESENCOFRADO NORMAL

m2

26.88

20.98

563.94

35.75

m2

30.24

17.75

0 10.04
0 10.04.01
0 10.05

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

536.76

INSTALACION DE ACCESORIOS

536.76

201.70

181.44
144.00

4,200.00

0 10.05.01

SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2"

und

12.00

247.09

2,965.08

159.96

0 10.05.02

INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8"

und

12.00

102.91

1,234.92

19.20

11 11
0 11.01
0 11.01.01
0 11.02
0 11.02.01
0 11.03

VALVULAS DE PURGA (11 UND)

5,389.82

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

10.24
m2

7.70

1.33

m3

6.16

17.65

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

10.24
108.72

OBRAS DE CONCRETO ARMADO

108.72
2,472.62

0 11.03.01

CONCRETO FC=175 KG/CM2

m3

3.08

336.52

1,036.48

13.68

24.64

0 11.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

233.59

4.35

1,016.12

93.44

84.09

0 11.03.03

ENCOFRADO Y DESENCOFRADO NORMAL

m2

20.02

20.98

420.02

26.63

m2

20.02

17.75

0 11.04
0 11.04.01
0 11.05

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

355.36

INSTALACION DE ACCESORIOS

355.36

133.53

120.12
132.00

2,442.88

0 11.05.01

SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2"

und

11.00

115.67

1,272.37

146.63

0 11.05.02

INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8"

und

11.00

106.41

1,170.51

22.00

12 12
0 12.01

CAMARA DE ROMPE PRESION ( 05 UND)

9,562.26

TRABAJOS PRELIMINARES

35.70

0 12.01.01

LIMPIEZA DE TERRENO MANUAL

m2

15.00

1.05

0 12.01.02

TRAZO Y REPLANTEO

m2

15.00

1.33

0 12.02
0 12.02.01
0 12.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

15.75
19.95
219.57

m3

12.44

17.65

OBRAS DE CONCRETO ARMADO

219.57
6,824.24

0 12.03.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

70.65

20.98

1,482.24

93.96

0 12.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

548.50

4.35

2,385.98

219.40

197.46

0 12.03.03

CONCRETO FC=210 KG/CM2

m3

6.87

430.28

2,956.02

109.92

98.93

0 12.04
0 12.04.01
0 12.05

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)

1,114.75
m2

32.50

34.30

INSTALACION DE ACCESORIOS

1,114.75

185.58

1,368.00

0 12.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION

GLB

5.00

164.10

820.50

66.65

0 12.05.02

INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8"

und

5.00

109.50

547.50

100.00

13 13
0 13.01

CAMARA DE REUNION (01 UND)

1,892.78

TRABAJOS PRELIMINARES

7.14

0 13.01.01

LIMPIEZA DE TERRENO MANUAL

m2

3.00

1.05

0 13.01.02

TRAZO Y REPLANTEO

m2

3.00

1.33

0 13.02
0 13.02.01
0 13.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

2.49
14.13

0 13.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 13.03.03

CONCRETO FC=210 KG/CM2

m3

20.98

296.45

18.79

109.70

4.35

477.20

43.88

39.49

1.37

430.28

589.48

21.92

19.73

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)

43.95
1,363.13

m2

0 13.05

17.65

OBRAS DE CONCRETO ARMADO


ENCOFRADO Y DESENCOFRADO NORMAL

0 13.04.01

3.99
43.95

0 13.03.01

0 13.04

3.15

222.95
m2

6.50

34.30

INSTALACION DE ACCESORIOS

222.95

37.12

255.61

0 13.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION

GLB

1.00

146.11

146.11

13.33

0 13.05.02

INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8"

und

1.00

109.50

109.50

20.00

1.00

4,500.00

240.00

16.12

14 14

MITIGACION DE IMPACTO AMBIENTAL

8,368.80

0 14.01

CONTROL Y MITIGACION DE IMPACTO AMBIENTAL

GLB

0 14.02

CONFORMACION DE BOTADERO

m2

15 15

FLETE

4,500.00
3,868.80

FLETE TERRESTRE

GLB

1.00

23,000.00

23,000.00

0 15.02

FLETE RURAL

GLB

1.00

8,500.00

8,500.00

0 16.01

CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EMPRESARIGLB

1.00

3,500.00

0 16.02

CAPACITACION EN MANEJO DE RIEGO

GLB

1.00

700.00

GLB

1.00

3,400.00

17 17
0 17.01

CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO

4,200.00

FORTALECIMIENTO EN GESTION DE RIEGO


CONSTITUCION, ORGANIZACIN Y O&M DEL SISTEMA DE RIEGO
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%
SUB-TOTAL
IGV 18%
TOTAL PRESUPUESTO

64.80

31,500.00

0 15.01
16 16

12.00

=0.08312/+0.501
3,500.00
700.00
3,400.00

VARIABLE
NDIRECTO
GG
UTI
ST
IGV

3,400.00
53070.542 10890.989

474,092.17
33,186.45
COEFICIENTE DE
INCIDENCIA (insumos)
23,704.61
530,983.23 Suma de I.U. semejantes
95,576.98 la suma debe ser al 100%
626,560.21

0.09995

0.02051
0.36066

1.0000

CONFORMACIN DE MONOMIOS
MONOMIOS

COEFICIENTE DE
INCIDENCIA

I.U.

1 MANO DE OBRA
2 MAQUINARIA Y EQUIPO NACIONAL
3 BRONCE
4 CEMENTO
5 TUBERIA
6 GG+UTI

LEYENDA
COSTO TOTALES DE CADA PARTIDAS DEL PRESUPUESTO
COSTO TOTALES DE CADA UNO DE LOS ELEMENTO
DISGREGADO
COEFICIENTE DE INCIDENCIA DE CADA UNO DE LOS ELEMENTO

47
48
30
21
72
39

0.50105
0.08605
0.14536
0.08312
0.07728
0.10714
1.00000

ANO DE OBRA

PEON

equipo

TOPOGRAFO

47

HERRAMIENTAS
MANUALES

CARRETILLA

37

37

COMPACTACION
MEZCLADORA VIBRADOR DE MEZCLADORA
Y VIBRADOR
DE CONCRETO CONCRETOo 4p DE CONCRETO
TIPO PLANCHA
DE 9-11p3
240"
TROMPO 8p 9p3
4hp

48

49

48

49

MIRA Y
JALONES

37

BOMBA
ANUAL
PARA
PRUEBA DE
TUBERIA
48

TEODOLITO

30

65

5.40

90.00
36.00

500.00

4.50
24.30

1.80

149.29

7.14

38.85

1.19

87.00

15.30

31.08
###

###

37.06

2.55

111.17

62.35

3.25

41.55

153.95

5.85
9.49
24.80
2.73

22.50

2.49

22.50

2.49

CARTELES
DE OBRA
IMPREA
LAMINA
FIBRA
SEGN
DISEO

74.80

34.20

13.20

8.91

0.66

27.77

1.33

12.18

0.37

121.50

5.49

479.88

32.76

99.00

3.30

120.00

5.76

126.00

6.30

3239.46

154.98

378.00

11.34

1417.50

42.53

302.40

14.87

3873.60

291.81

154.59

62.92

5.61

12.54

7.95

17.77

27.91
72.90

302.40
3248.44
453.60
1549.44

13.66
188.75

21.17

222.56

24.96

15.75

0.76

208.80

10.44

60.00

10.60

60.00

7.00

18.70

12.63

0.94

70.62

3.54

10.65

0.33

8.52

21.06

0.63

77.18

4.03

12.60

0.48

48.26
92.60

51.44

0.71
30.00

213.60

2.58

144.18

10.68

2928.88

87.15

320.40

10.68

320.40

16.02

183.06

6.19

961.20

29.48

293.70

26.70

192.24

16.02

6.00

0.30

932.40

629.37

380.42

1398.60

46.62

1398.60

69.93

799.07

27.04

10489.50

741.26

819.50

74.50

462.55

42.05

839.16

69.93

60.00

10.60

982.26

72.76

202.92

768.96

202.92

46.62

12785.07

1455.20

90.78

396.27

885.78

8391.60

885.78

618.46

1382.44

19953.70

593.72

2182.80

72.76

6839.44

436.56

1247.11

42.20

17735.25

1253.29

2000.90

181.90

1309.68

109.14

20.00

1.40

924.00

46.20

3.42

2.31

2510.22
14188.20

1382.44

0.17

19953.70

593.72

95.52

4.99

122.40

4.65

114.60

1.45

3.25

3.27

7.32

63.66

3.83
129.60

22.81

30.00

5.31

18.00

1.98

7.70
197.97

5.20

0.39
5.89

123.19

6.43

277.20

10.53
17.46

770.00

136.29

147.80

82.10

462.00

3.07

50.82

2.07

0.15

105.24

3.13

209.21

10.92

139.43

1.31

2.92

1.31

2.93

2.55

5.70

251.00

5.76
134.40

5.11
19.05
9.12

144.00

3.08

4.92

2.08

0.15

105.58

3.14

51.34

2.68

34.22

61.60

4.67
100.10

3.80
12.61
8.36

165.00

5.61

15.00
6.00

0.75
4.05

0.30

213.22

6.34

353.25

13.42
10.97

412.20

31.05

164.88

69.55

7.80

50.00

5.85
3.00

3.00
1.20

0.15
0.81

0.06

42.68

1.27

70.65

2.68

0.51

1.14

2.19
82.20

6.19

13.91

1.56

32.88

0.76
0.60

48.00

2.40

FRMULA POLINMICA

/+0.50105( )/( )+0.08605( )/( )+0.07728/+0.14536( )/( )+0.10714( )/( )

125725.83

1818.1638

6397.7858

5834.8325

1086.4194

445.6518

2059.8

23690.76

1144.7698

2471.14

2558.8972

500

0.23678

0.00342

0.01205

0.01099

0.00205

0.00084

0.00388

0.04462

0.00216

0.00465

0.00482

0.00094

0.36066

0.08605
1.00000

INSTALACION DEL SERVICIO

TAPA
TAPA
METALICA METALICAa
0.45x0.45
0.40x0.40
e=1/8"(incluid e=1/8 incluido
o marco)
marco
65

65

TAPA
METALICA
0.80x0.80n
e=1/8"

65

TAPA
METALICA
0.50x0.80m
e=1/8"

65

TAPA
TAPA
TAPA
METALICA
METALICA
METALICA
CONO DE
VALVULA
CODO DE
TEE PVC SAL UNION NIPLE
0.60x1.1n
0.40x0.60
0.60x0.60
REBOE PVC COMPUERTA
FIERRO de 1
3"x3"
PVC SAP 3"
e=1/8" incluio e=1/8 incluio e=1/8 incluio
6"x4"
BB4"
1/2"x90
marco
marco
marco
65

65

65

54.00
240.00
240.00

77

72

72

450.00

57.60

61.20

CODO PVC
SAP 4"x90"

NIPLE PVC
SAP 4" 1.00

72

90.00

130.50

34.00

38.40

270.00

6160.00

1066.80

110.00
977.90

444.50

88.90

6160

240

1066.8

1422.4

270

88.9

240

54

450

130

61.2

110

90

130.5

0.01160

0.00045

0.00201

0.00268

0.00051

0.00017

0.00045

0.00010

0.00085

0.00024

0.00012

0.00021

0.00017

0.00025

RVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUM

NIPLE DE f
GALVANIZAD
O DE 1 1/2"x1
1/2"

65

NIPLE e fo
DE 3"x9"

CANASTILLA
3"

65

UNION
UNION
ACERO DE
UNIVERSAL
CLAVO PARA
UNIVERSAL
REFUERZO
DE fo
MADERA c/c
DE fo GALV
fy=4200
GALVANIZAD
2"
3"
GRADO 60
O DE 1 1/2"
65

65

MADERA
TORNILLO
inc/corte
p/encofrado

43

ALAMBRE
NEGRO
RECOCIDO
NEGRO #8

OALAMBRE
NEGRO #8

ALAMBRE
NEGRO #16

ALAMBRE CLAVO PARA


PIEDRA
RECOCIDO MADERA c/c GRANDE DE
#8
3"
8"

77.20

385.80
1575.21
3.15
150.00

105.00

222.00

37.87
118.62

21.55

125.83

2252.39
2267.56

52.13

125.83
170.75

31.58
117.46

3.10
8.85

1.76

306.73
635.78

694.66
2.22

30.11

17.14

68.19

38.81

47.88

955.76

71.97
336.81

33.06

18.82

2.42
288.00

1152.00

775.52

58.40
250.85

24.62

885.24

86.90

14.01

1.60

1821.02

49.46
137.13

177.05

17.38

9.89

364.20

27.43

288

150

105

1152

222

135.22

6244.9532

7588.6751

128.904

52.1304

641.0025

172.3353

297.269

77.2

0.00054

0.00028

0.00020

0.00217

0.00042

0.00025

0.01176

0.01429

0.00024

0.00010

0.00121

0.00032

0.00056

0.00015

YRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA


MATERIALES

CEMENT
ESTACA
O
ARENA
YEO DE 28 DE
PORTALN FINA
MADERA
D TIPO I

30

43

5.40

2.70

21

CUARTON
ALAMBRE
EUCALIPT
DE PUAS
O
#16
3"x3"x2.5

HORMIGONAGUA

173.78

38

39

111.36

0.31

671.64
665.23

99.61

362.78

72.44

2.09

45

JUNTA
PUERTA
CANDAD
INTER
CANASTIL
DE
IMPERME ADITIVO
ASFALTO PEGAME
O
WATER
LA DE
CINTA
CALAMIN ABILIZAN EPOXICO
LIQUIDO NTO
INCLUIDO
TOP
SALIDA
TEFLON
A DE
TE
SIKA 32
rc-250
PARA PVC
ALDABA
NEOPREN
DE 3"
1.85x1
E 9"
26

30

30

30

13

30

CONO DE
REBOSE
DE PVC
3"

1.98

0.99

242.69

155.52

0.44
468.00
396.00
75.00

770.99

1575.00

5.54

13281.93

6778.80

40.67

495.00

1126.31

243.43

2.65

370.44

568.89

1328.08

287.04

3.12

436.80

670.80
26.46

20.01

142.68
0.70
0.70

2.81

1.40

70.00

6.00
6.00

72.80

823.54

449.11

2.59

25.00

32.04

165.00

16.02

373.80

139.86

69.93

1043.00
588.70

218.28

109.14

2546.60

346.50

0.51

0.26

1019.20

109.38

555.81

3.21

59.62
11.25

1.16

0.58

1314.46

70.13

716.83

4.14

51.00
288.75

0.46

0.23

2232.27

76.51

1217.35

7.03

55.64
84.00

0.46

108.00

0.23

547.84

50.65

298.76

1.72

36.84
66.00

0.90

0.45

1413.37

721.35

4.33

415.03

89.70

0.98

136.50

209.63
7.00

0.18

350.00

91.00

0.09

281.85
83.01

143.85
17.94

0.86
0.20

27.30

41.93
0.02

404.0364 202.0182 26125.846


0.00076

0.00038

0.04920

933.662 13758.16

79.8818

468

396

100

660

971.04

1491.24

26.46

142.68

4644.5

420

832.52

163.8

0.00176

0.00015

0.00088

0.00075

0.00019

0.00124

0.00183

0.00281

0.00005

0.00027

0.00875

0.00079

0.00157

0.00031

0.02591

0.55329

ADAPATA aADAPAT
CONO DE
DOR
ADOR
90 PVC
PARA PVC PARA PVC
SAP 3"
SAP 1 1/2" SAP 3"

VALVULA
DE
COMPUE
RTA DE
BRONCE
DE 1 1/2"

VALVULA
DE
COMPUE
GRAPA
RTA DE
BRONCE
DE 3"
77

MALLA
COCADA
ROLLIZO
2" DE
DE
TIERRA
ALAMBRE
EUCALIPT
CERNIDA
GALVANIZ
O DE 5"
ADO
8bw=2.0
41

30

TUBERIA
PVC AP
PRESION
3"CLASE
7.5
72

TUBERIA
CODO
TEE PVC
PVC AP
TEE PVC
REDUCCI REDUCCI REDUCCI PVC
CON
PRESION
CON
ON PVC ON PVC ON PVC SAP(aua)c
REDUCCI
1.5"
REDUCCI
1.1/2"x1" SAP 3"
SAP 3"a2" on roca
ON 3"-1
CLASE
ON 3"-2"
3"x90"
1/2"
7.5
72

72

72

72

72

72

72

TEE PVC
CON
REDUCCI
ON 3"-2"

72

50.00
50.00

32.00

170.00

192.50

1260.00

1000.00

934.50
37.38

2862.24

10.00

28.00

4079.25
163.17

7986.40
4154.54

13.00

6.00

6.50

254.66

16880.32

60.00

616.00

180.00

4620.00

96.00

660.00

88.00

605.88

38.50

250.00

20.00

60.00

9.00

800

430

32

5885.88

410

192.5

1260

1000

0.00151

0.00081

0.00006

0.01108

0.00077

0.00036

0.00237

0.00188

5468.96 15003.18 16880.32


0.01030

0.02826

0.03179

38.5

10

28

13

6.5

0.00007

0.00002

0.00002

0.00005

0.00002

0.00001

0.00001

ASPEROR
BRONCE
YEE PVC YEE PVC YEE PVC
CODO DE CODO DE CODO DE CODO DE SECTORA
TEE PVC
c/reuccion c/reuccion c/reuccion
FIERRO PVC SAP PVC SAP PVC SAP L 3/4"
3"
3"-2"
2"-1 1/2" 3"-1 1/2"
DE 3"x90 1 1/2x90 45 1 1/2 22 1 1/2 SILVER
BOQUILL
A 4MM
72

72

72

72

65

72

72

72

30

QUEBRAC ELEVADO
HORRO R f e
TRIPODE LLAVE
DE
3/4"X80m ANGOTAB TIPO TEE
BRONCE conexin LE DE 3/4" DE 1/2"
DE 3/4"
de marco
30

49

LLAVE
PVC TIPO
BAYONET
A DE 3/4"

CODO
TEE p.e.
p.e.
32mmx3/4
32mmx3/4
"
"

72

72

MANGUE
TAPON
RA
PVC DE
PLASTICA
3/4"
DE 3/4"

72

7.00

48.00

14.00

6.50

20.80

15.60

36.40
24640.00

1540.00

7700.00 15400.00

1270.50

770.00

770.00

8470.00

264.00

38.50

10.00

14.00

48

14

6.5

10

20.8

15.6

36.4

24640

1540

7700

15400

264

1270.5

770

770

8470

52.5

0.00001

0.00009

0.00003

0.00001

0.00002

0.00004

0.00003

0.00007

0.04640

0.00290

0.01450

0.02900

0.00050

0.00239

0.00145

0.00145

0.01595

0.00010

TEE PVC
SAP
ROSCAD
O 1 1/2"

72

TIERRA
TEE PVC
DE
AP DE 3"
BOTADER RENDIMIE
CHACRA
GG+UTI
c/r para
O
NTO
O
agua
VEGETAL
72

SUB TOTAL

39

685.40 0.0012908
900.00

900.00 0.001695

94.50 0.000178
119.70 0.0002254
246.06 0.0004634
71.12 0.0001339
472.67 0.0008902
946.55 0.0017826
1258.58 0.0023703
645.97 0.0012166
2063.90 0.0038869
698.82 0.0013161
1414.23 0.0026634
324.99 0.0006121
324.99 0.0006121

43.89 8.27E-005
45.77 8.62E-005
40.4579 7.62E-005
660.10 0.0012432
1588.68 0.002992
498.30 0.0009384
767.76 0.0014459

132.30 0.0002492
5339.25 0.0100554
691.74 0.0013028
4708.46 0.0088674
3313.93 0.0062411
27778.88 0.0523159
4724.09 0.0088969
2971.05 0.0055954
3025.26 0.0056975
3567.20 0.0067181
64.01 0.0001205
507.21 0.0009552
422.10 0.0007949
439.70 0.0008281

62.19 0.0001171
74.16 0.0001397
19.50 3.67E-005

69.95 0.0001317
1558.09 0.0029343
52.87 9.96E-005
153.90 0.0002898
2731.08 0.0051434

710.22 0.0013376
3016.03 0.0056801
331.08 0.0006235
1463.16 0.0027556
250.98 0.0004727
1759.64 0.0033139
3748.68 0.0070599
582.06 0.0010962
86.70 0.0001633

3100.23 0.0058387
13165.49 0.0247945
1445.22 0.0027218
6386.94 0.0120285
1095.57 0.0020633
33608.36 0.0632946
10459.80 0.0196989
5550.60 0.0104534
2540.79 0.0047851
323.60 0.0006094

4838.54 0.0091124

20547.42 0.0386969
2255.56 0.0042479
11423.32 0.0215135
1709.86 0.0032202
56823.74 0.1070161
22919.40 0.0431641
3965.42 0.0074681
120.87 0.0002276
62493.20 0.1176934

11.37 2.14E-005
20547.42 0.0386969
1928.26 0.0036315
513.59 0.0009672
833.03 0.0015688
649.81 0.0012238
362.55 0.0006828
337.98 0.0006365

25.60 4.82E-005
203.86 0.0003839
2486.88 0.0046835
1163.13 0.0021905
492.03 0.0009266
8381.45 0.0157848

7904.82 0.0148871

10.21 1.92E-005
108.37 0.0002041
4223.33 0.0079538
1252.28 0.0023584
563.94 0.0010621
536.76 0.0010109
2965.08 0.0055841
1234.92 0.0023257

10.24 1.93E-005
108.72 0.0002048
1036.48 0.001952
1016.12 0.0019137
420.02 0.000791
355.36 0.0006692
38.50

1272.37 0.0023963
1170.51 0.0022044

15.75 2.97E-005
19.95 3.76E-005
219.57 0.0004135
1482.24 0.0027915
2385.98 0.0044935
2956.02 0.0055671

1114.75 0.0020994
820.50 0.0015452
547.50 0.0010311

3.15 5.93E-006
3.99 7.51E-006
43.95 8.28E-005
296.45 0.0005583
477.20 0.0008987
589.48 0.0011102
222.95 0.0004199
7.00

146.11

0.00028

109.50

0.00021

4500.00

0.00847

3868.80

0.00729

23000.00

23000.00

0.04332

8500.00

8500.00

0.01601

3500.00

3500.00

0.00659

700.00

700.00

0.00132

3400.00

3400.00

0.00640

56,891.06

530983.22

1.00000

0.10714

1.00000

4500.00
153.60

38.5

153.6

0.00007

0.00001

0.00029

3600.00

3600 44500.00
0.00678

0.08381

Item

0 01
0 01.01
0 01.02
0 02
0 02.01
0 02.01.01
0 02.01.02
0 02.02
0 02.02.01
0 02.02.02
0 02.03
0 02.03.01
0 02.03.02
0 02.04
0 02.04.01
0 02.04.02
0 02.04.03
0 02.05
0 02.05.01
0 02.06
0 02.06.01
0 02.07
0 02.07.01
0 02.07.02
0 02.08
0 02.08.01
0 02.08.01.01
0 02.08.02
0 02.08.02.01
0 02.08.02.02
0 02.08.03
0 02.08.03.01
0 02.08.04
0 02.08.04.01
0 02.08.04.02
0 02.08.04.03
0 03
0 03.01
0 03.01.01
0 03.02
0 03.02.01
0 03.02.02
0 03.02.03
0 03.03
0 03.03.01
0 03.04
0 03.04.01
0 03.04.02
0 03.04.03
0 03.05
0 03.05.01
0 03.05.02
0 03.05.03
0 03.05.04

Descripcin

OBRAS PRELIMINARES
CARTEL DE OBRA
ALQUILER PARA OFICINA Y ALMACEN DE OBRA
CAPTACION (03 UNID)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL
RELLENO CON MATERIAL PROPIO
OBRAS DE CONCRETO SIMPLE
CONCRETO SIMPLE FC=140 KG/CM2
CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM
OBRAS DE CONCRETO ARMADO
CONCRETO FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO (MORTERO 1:3 e=1.5cm)
INSTALACIONES DE ACCESORIOS
INSTALACIONES DE ACCESORIOS
CARPINTERIA METALICA
INSTALACION DE TAPA METALICA 60X60cm
INSTALACION DE TAPA METALICA 40X40cm
CERCO PERIMETRICO DE SEGURIDAD
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M
CONCRETO SIMPLE
CONCRETO FC=140 KG/CM2
COLOCACION DE CERCO PERIMETRICO
COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50
ALAMBRE DE PUAS N 12
COLOCADO DE PUERTA CON MARCO DE MADERA
RESERVORIO NOCTURNO 216 M3 (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL
REFINE, NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M
CONCRETO SIMPLE
SOLADO DE CONCRETO C:H 1:10 E=0.10M
CONCRETO ARMADO
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
REVESTIMIENTO Y JUNTAS
TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO
TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA
WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA
BRUA DE DILATACION CON ASFALTO E=1"

Und.

und
GLB

Metrado

1.00
1.00

m2
m2

90.00
90.00

m3
m3

8.71
5.18

m3
m3

1.16
7.72

m3
m2
kg

3.74
30.79
474.46

m2

39.37

GLB

3.00

und
und

3.00
3.00

m2

33.00

m3
m3

1.62
2.03

m3

1.62

und
m
und

36.00
330.00
3.00

m2

126.00

m3
m2
m3

189.00
126.00
236.25

m3

12.60

m3
m2
kg

64.56
179.76
683.00

m2
m2
m
m

88.20
104.00
12.60
87.00

0 03.06
0 03.06.01
0 03.06.02
0 03.07
0 03.07.01
0 03.07.01.01
0 03.07.02
0 03.07.02.01
0 03.07.02.02
0 03.07.02.03
0 03.07.03
0 03.07.03.01
0 03.07.03.02
0 03.07.03.03
0 03.07.04
0 03.07.04.01
0 04
0 04.01
0 04.01.01
0 04.02
0 04.02.01
0 04.02.02
0 04.02.03
0 04.02.04
0 04.02.05
0 04.03
0 04.03.01
0 04.03.02
0 04.04
0 04.04.01
0 05
0 05.01
0 05.01.01
0 05.02
0 05.02.01
0 05.02.02
0 05.02.03
0 05.02.04
0 05.02.05
0 05.03
0 05.03.01
0 05.03.02
0 05.03.03
0 05.04
0 05.04.01
0 06
0 06.01
0 06.01.01
0 06.02
0 06.02.01
0 06.02.02
0 06.02.03
0 06.02.04
0 06.02.05
0 06.03
0 06.03.01
0 06.03.02
0 06.04
0 06.04.01
0 07

OTRAS PARTIDAS
SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS
CERCO PERIMETRICO DE SEGURIDAD
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS EN TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL DE EXCAVACION D>50m
OBRAS DE CONCRETO ARMADO
CONCRETO FC=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO
INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO
LINEA DE CONDUCCION TUB. PVC L = 534.00 ML
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.
CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)
RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO
RELLENO COMPACTADO CON MATERIAL PROPIO
INSTALACION DE TUBERIAS PVC
INSTALACION DE TUBERIA 3" PVC C-7.5
DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC
INSTALACION DE ACCESORIOS
INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION
LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.
CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)
RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO
RELLENO CON MATERIAL PROPIO
INSTALACION DE TUBERIAS PVC
INSTALACION DE TUBERIA 3" PVC C-7.5
INSTALACION DE TUBERIA 2" PVC C-7.5
DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC
INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION
LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.
CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm)
RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO
RELLENO CON MATERIAL PROPIO
INSTALACION DE TUBERIAS PVC
INSTALACION DE TUBERIA 1.5" PVC C-7.5
DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC
INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO
LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND)

GLB
GLB

1.00
1.00

m2

46.76

m3
m3
m3

4.12
1.42
3.51

m3
m2
kg

4.63
2.52
35.38

GLB

1.00

m2

534.00

m3
m
m
m3
m3

170.88
534.00
534.00
21.36
128.16

m
m

534.00
534.00

GLB

1.00

m2

2,331.00

m3
m
m
m3
m3

745.92
2,331.00
2,331.00
93.24
1,398.60

m
m
m

1,490.00
841.00
2,331.00

GLB

1.00

m2

3,638.00

m3
m
m
m3
m3

1,164.16
3,638.00
3,638.00
145.52
2,364.70

m
m

3,638.00
3,638.00

GLB

1.00

0 07.01
0 08
0 08.01
0 08.01.01
0 08.02
0 08.02.01
0 08.03
0 08.03.01
0 08.03.02
0 08.03.03
0 08.04
0 08.04.01
0 08.05
0 08.05.01
0 08.05.02
0 09
0 09.01
0 09.01.01
0 09.02
0 09.02.01
0 09.03
0 09.03.01
0 09.03.02
0 09.04
0 09.04.01
0 09.05
0 09.05.01
0 09.05.02
0 10
0 10.01
0 10.01.01
0 10.02
0 10.02.01
0 10.03
0 10.03.01
0 10.03.02
0 10.03.03
0 10.04
0 10.04.01
0 10.05
0 10.05.01
0 10.05.02
0 11
0 11.01
0 11.01.01
0 11.02
0 11.02.01
0 11.03
0 11.03.01
0 11.03.02
0 11.03.03
0 11.04
0 11.04.01
0 11.05
0 11.05.01
0 11.05.02
0 12
0 12.01
0 12.01.01
0 12.01.02

SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVERund


CABECERA DE RIEGO ( 3 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
m3
OBRAS DE CONCRETO ARMADO
CONCRETO FC=175 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL
m2
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
kg
ACABADOS
TARRAJEO (MEZCLA 1:3 e=1.5cm)
m2
INSTALACIONES DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO
GLB
INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8"
und
HIDRANTES ( 77 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
m3
OBRAS DE CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO NORMAL
m2
ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)
m2
INSTALACION DE ACCESORIOS
SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2"
und
INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8"
und
VALVULAS DE CONTRO (12 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
m3
OBRAS DE CONCRETO ARMADO
CONCRETO FC=175 KG/CM2
m3
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
kg
ENCOFRADO Y DESENCOFRADO NORMAL
m2
ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)
m2
INSTALACION DE ACCESORIOS
SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2"
und
INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8"
und
VALVULAS DE PURGA (11 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
m3
OBRAS DE CONCRETO ARMADO
CONCRETO FC=175 KG/CM2
m3
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
kg
ENCOFRADO Y DESENCOFRADO NORMAL
m2
ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)
m2
INSTALACION DE ACCESORIOS
SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2"
und
INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8"
und
CAMARA DE ROMPE PRESION ( 05 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
TRAZO Y REPLANTEO
m2

77.00

8.55
1,164.16
5.73
24.48
191.50
25.92
3.00
3.00

19.25
11.55
7.39
55.44
27.72
77.00
77.00

7.68
6.14
12.55
287.88
26.88
30.24
12.00
12.00

7.70
6.16
3.08
233.59
20.02
20.02
11.00
11.00

15.00
15.00

0 12.02
0 12.02.01
0 12.03
0 12.03.01
0 12.03.02
0 12.03.03
0 12.04
0 12.04.01
0 12.05
0 12.05.01
0 12.05.02
0 13
0 13.01
0 13.01.01
0 13.01.02
0 13.02
0 13.02.01
0 13.03
0 13.03.01
0 13.03.02
0 13.03.03
0 13.04
0 13.04.01
0 13.05
0 13.05.01
0 13.05.02
0 14
0 14.01
0 14.02
0 15
0 15.01
0 15.02
0 16
0 16.01
0 16.02
0 17
0 17.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
CONCRETO FC=210 KG/CM2
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)
INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION
INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8"
CAMARA DE REUNION (01 UND)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60
CONCRETO FC=210 KG/CM2
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)
INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION
INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8"
MITIGACION DE IMPACTO AMBIENTAL
CONTROL Y MITIGACION DE IMPACTO AMBIENTAL
CONFORMACION DE BOTADERO
FLETE
FLETE TERRESTRE
FLETE RURAL
CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO
CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EMP
CAPACITACION EN MANEJO DE RIEGO
FORTALECIMIENTO EN GESTION DE RIEGO
CONSTITUCION, ORGANIZACIN Y O&M DEL SISTEMA DE RIEGO

m3

12.44

m2
kg
m3

70.65
548.50
6.87

m2

32.50

GLB
und

5.00
5.00

m2
m2

3.00
3.00

m3

2.49

m2
kg
m3

14.13
109.70
1.37

m2

6.50

GLB
und

1.00
1.00

GLB
m2

1.00
240.00

GLB
GLB

1.00
1.00

GLB
GLB

1.00
1.00

GLB

1.00

Precio (S/.)

685.40
900.00

1.05
1.33
28.25
13.73
407.47
122.61
336.52
20.98
4.35
17.75
471.41
108.33
108.33

1.33
28.25
19.93
407.47
44.13
1.51
255.92

1.05
28.25
5.49
19.93
263.01
430.28
26.28
4.35
34.30
34.30
5.08
5.83

Parcial (S/.)

1,585.40
685.40
900.00
12,327.04
214.20
94.50
119.70
317.18
246.06
71.12
1,419.22
472.67
946.55
3,968.45
1,258.58
645.97
2,063.90
698.82
698.82
1,414.23
1,414.23
649.98
324.99
324.99
3,644.96
43.89
43.89
86.23
45.77
40.46
660.10
660.10
2,854.74
1,588.68
498.30
767.76
62,406.92
132.30
132.30
10,739.45
5,339.25
691.74
4,708.46
3,313.93
3,313.93
35,474.02
27,778.88
4,724.09
2,971.05
7,163.68
3,025.26
3,567.20
64.01
507.21

PORQUE

por

422.10
439.70

1.33
18.00
13.73
19.93
336.52
20.98
4.35
2,731.08

1.33
17.65
0.62
2.74
11.75
13.73
7.02
1.09
86.70

1.33
17.65
0.62
2.74
11.75
24.03
7.02
6.60
1.09
323.60

1.33
17.65
0.62
3.14
11.75
24.03
6.30
1.09
120.87

861.80
422.10
439.70
4,721.74
62.19
62.19
163.61
74.16
19.50
69.95
1,764.86
1,558.09
52.87
153.90
2,731.08
2,731.08
11,948.55
710.22
710.22
6,820.89
3,016.03
331.08
1,463.16
250.98
1,759.64
4,330.74
3,748.68
582.06
86.70
86.70
77,676.60
3,100.23
3,100.23
55,701.58
13,165.49
1,445.22
6,386.94
1,095.57
33,608.36
18,551.19
10,459.80
5,550.60
2,540.79
323.60
323.60
124,604.13
4,838.54
4,838.54
92,759.90
20,547.42
2,255.56
11,423.32
1,709.86
56,823.74
26,884.82
22,919.40
3,965.42
120.87
120.87
62,493.20

811.60

1.33
17.65
336.52
20.98
4.35
25.07
120.85
112.66

1.33
17.65
336.52
20.98
17.75
108.85
102.66

1.33
17.65
336.52
4.35
20.98
17.75
247.09
102.91

1.33
17.65
336.52
4.35
20.98
17.75
115.67
106.41

1.05
1.33

62,493.20
25,184.01
11.37
11.37
20,547.42
20,547.42
3,274.88
1,928.26
513.59
833.03
649.81
649.81
700.53
362.55
337.98
20,657.77
25.60
25.60
203.86
203.86
3,650.01
2,486.88
1,163.13
492.03
492.03
16,286.27
8,381.45
7,904.82
10,894.89
10.21
10.21
108.37
108.37
6,039.55
4,223.33
1,252.28
563.94
536.76
536.76
4,200.00
2,965.08
1,234.92
5,389.82
10.24
10.24
108.72
108.72
2,472.62
1,036.48
1,016.12
420.02
355.36
355.36
2,442.88
1,272.37
1,170.51
9,562.26
35.70
15.75
19.95

17.65
20.98
4.35
430.28
34.30
164.10
109.50

1.05
1.33
17.65
20.98
4.35
430.28
34.30
146.11
109.50
4,500.00
16.12
23,000.00
8,500.00
3,500.00
700.00
3,400.00

219.57
219.57
6,824.24
1,482.24
2,385.98
2,956.02
1,114.75
1,114.75
1,368.00
820.50
547.50
1,892.78
7.14
3.15
3.99
43.95
43.95
1,363.13
296.45
477.20
589.48
222.95
222.95
255.61
146.11
109.50
8,368.80
4,500.00
3,868.80
31,500.00
23,000.00
8,500.00
4,200.00
3,500.00
700.00
3,400.00
3,400.00

ELABORACIN DE FRMULA POLINMICA

Item

Descripcin

Und.

I.U.
1 01
0 01.01
0 01.02
2 02
0 02.01
0 02.01.01
0 02.01.02
0 02.02
0 02.02.01
0 02.02.02
0 02.03

OBRAS PRELIMINARES
CARTEL DE OBRA

und

ALQUILER PARA OFICINA Y ALMACEN DE OBRA

GLB

CAPTACION (03 UNID)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO

m2
m2

MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL

m3

RELLENO CON MATERIAL PROPIO

m3

OBRAS DE CONCRETO SIMPLE

0 02.03.01

CONCRETO SIMPLE FC=140 KG/CM2

m3

0 02.03.02

CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM

m3

0 02.04
0 02.04.01

OBRAS DE CONCRETO ARMADO


CONCRETO FC=175 KG/CM2

m3

0 02.04.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 02.04.03

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 02.05
0 02.05.01
0 02.06
0 02.06.01
0 02.07

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO (MORTERO 1:3 e=1.5cm)

m2

INSTALACIONES DE ACCESORIOS
INSTALACIONES DE ACCESORIOS

GLB

CARPINTERIA METALICA

0 02.07.01

INSTALACION DE TAPA METALICA 60X60cm

und

0 02.07.02

INSTALACION DE TAPA METALICA 40X40cm

und

0 02.08
0 02.08.01
0 02.08.01.01
0 02.08.02

CERCO PERIMETRICO DE SEGURIDAD


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS

0 02.08.02.01

EXCAVACION MANUAL TERRENO NORMAL

m3

0 02.08.02.02

ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M

m3

0 02.08.03
0 02.08.03.01
0 02.08.04

CONCRETO SIMPLE
CONCRETO FC=140 KG/CM2

m3

COLOCACION DE CERCO PERIMETRICO

0 02.08.04.01

COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50

und

0 02.08.04.02

ALAMBRE DE PUAS N 12

0 02.08.04.03

COLOCADO DE PUERTA CON MARCO DE MADERA

und

3 03
0 03.01
0 03.01.01
0 03.02

RESERVORIO NOCTURNO 216 M3 (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

m2

MOVIMIENTO DE TIERRAS

0 03.02.01

EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL

m3

0 03.02.02

REFINE, NIVELACION Y COMPACTACION

m2

ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M

m3

0 03.02.03
0 03.03

CONCRETO SIMPLE

0 03.03.01
0 03.04

SOLADO DE CONCRETO C:H 1:10 E=0.10M

m3

CONCRETO ARMADO

0 03.04.01

CONCRETO FC=210 KG/CM2

m3

0 03.04.02

ENCOFRADO Y DESENCOFRADO DE MUROS

m2

0 03.04.03

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 03.05

REVESTIMIENTO Y JUNTAS

0 03.05.01

TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO

m2

0 03.05.02

TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA

m2

0 03.05.03

WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA

0 03.05.04

BRUA DE DILATACION CON ASFALTO E=1"

0 03.06

OTRAS PARTIDAS

0 03.06.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS

GLB

0 03.06.02

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS

GLB

0 03.07
0 03.07.01
0 03.07.01.01
0 03.07.02

CERCO PERIMETRICO DE SEGURIDAD


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS

0 03.07.02.01

EXCAVACION PARA ZAPATAS EN TERRENO NORMAL

m3

0 03.07.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

0 03.07.02.03

ELIMINACION DE MATERIAL DE EXCAVACION D>50m

m3

0 03.07.03

OBRAS DE CONCRETO ARMADO

0 03.07.03.01

CONCRETO FC=175 KG/CM2

m3

0 03.07.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 03.07.03.03

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 03.07.04
0 03.07.04.01
4 04
0 04.01
0 04.01.01
0 04.02

INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO


INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO

GLB

LINEA DE CONDUCCION TUB. PVC L = 534.00 ML


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS

0 04.02.01

EXCAVACION MANUAL EN TERRENO NORMAL

m3

0 04.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

0 04.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)

0 04.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

0 04.02.05

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

0 04.03

INSTALACION DE TUBERIAS PVC

0 04.03.01

INSTALACION DE TUBERIA 3" PVC C-7.5

0 04.03.02

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

0 04.04
0 04.04.01
5 05
0 05.01
0 05.01.01
0 05.02

INSTALACION DE ACCESORIOS
INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION

GLB

LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS

0 05.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

0 05.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

0 05.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm)

0 05.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

0 05.02.05

RELLENO CON MATERIAL PROPIO

m3

0 05.03

INSTALACION DE TUBERIAS PVC

0 05.03.01

INSTALACION DE TUBERIA 3" PVC C-7.5

0 05.03.02

INSTALACION DE TUBERIA 2" PVC C-7.5

0 05.03.03

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

0 05.04
0 05.04.01
6 06
0 06.01
0 06.01.01
0 06.02

INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION

GLB

LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS

0 06.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

0 06.02.02

REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m.

0 06.02.03

CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm)

0 06.02.04

RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO

m3

0 06.02.05

RELLENO CON MATERIAL PROPIO

m3

0 06.03
0 06.03.01
0 06.03.02
0 06.04
0 06.04.01
7 07
0 07.01
8 08
0 08.01
0 08.01.01
0 08.02
0 08.02.01
0 08.03

INSTALACION DE TUBERIAS PVC


INSTALACION DE TUBERIA 1.5" PVC C-7.5

DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC

INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO

GLB

LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND)


SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVER

und

CABECERA DE RIEGO ( 3 UND)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO ARMADO

0 08.03.01

CONCRETO FC=175 KG/CM2

m3

0 08.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 08.03.03

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 08.04
0 08.04.01
0 08.05

ACABADOS
TARRAJEO (MEZCLA 1:3 e=1.5cm)

m2

INSTALACIONES DE ACCESORIOS

0 08.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO

GLB

0 08.05.02

INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8"

und

9 09
0 09.01
0 09.01.01
0 09.02
0 09.02.01
0 09.03

HIDRANTES ( 77 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO SIMPLE

0 09.03.01

CONCRETO FC=175 KG/CM2

m3

0 09.03.02

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 09.04
0 09.04.01
0 09.05

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

m2

INSTALACION DE ACCESORIOS

0 09.05.01

SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2"

und

0 09.05.02

INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8"

und

10 10
0 10.01
0 10.01.01
0 10.02
0 10.02.01
0 10.03

VALVULAS DE CONTRO (12 UND)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO ARMADO

0 10.03.01

CONCRETO FC=175 KG/CM2

m3

0 10.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 10.03.03
0 10.04
0 10.04.01
0 10.05

ENCOFRADO Y DESENCOFRADO NORMAL

m2

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

m2

INSTALACION DE ACCESORIOS

0 10.05.01

SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2"

und

0 10.05.02

INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8"

und

11 11
0 11.01
0 11.01.01
0 11.02
0 11.02.01
0 11.03

VALVULAS DE PURGA (11 UND)


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO ARMADO

0 11.03.01

CONCRETO FC=175 KG/CM2

m3

0 11.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 11.03.03

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 11.04
0 11.04.01
0 11.05

ACABADOS
TARRAJEO (MORTERO 1:3 e=1.5cm)

m2

INSTALACION DE ACCESORIOS

0 11.05.01

SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2"

und

0 11.05.02

INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8"

und

12 12
0 12.01

CAMARA DE ROMPE PRESION ( 05 UND)


TRABAJOS PRELIMINARES

0 12.01.01

LIMPIEZA DE TERRENO MANUAL

m2

0 12.01.02

TRAZO Y REPLANTEO

m2

0 12.02
0 12.02.01
0 12.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO ARMADO

0 12.03.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 12.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

CONCRETO FC=210 KG/CM2

m3

0 12.03.03
0 12.04
0 12.04.01
0 12.05

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)

m2

INSTALACION DE ACCESORIOS

0 12.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION

GLB

0 12.05.02

INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8"

und

13 13
0 13.01

CAMARA DE REUNION (01 UND)


TRABAJOS PRELIMINARES

0 13.01.01

LIMPIEZA DE TERRENO MANUAL

m2

0 13.01.02

TRAZO Y REPLANTEO

m2

0 13.02
0 13.02.01
0 13.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

m3

OBRAS DE CONCRETO ARMADO

0 13.03.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

0 13.03.02

ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60

kg

0 13.03.03

CONCRETO FC=210 KG/CM2

m3

0 13.04
0 13.04.01
0 13.05

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM)

m2

INSTALACION DE ACCESORIOS

0 13.05.01

SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION

GLB

0 13.05.02

INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8"

und

14 14

MITIGACION DE IMPACTO AMBIENTAL

0 14.01

CONTROL Y MITIGACION DE IMPACTO AMBIENTAL

GLB

0 14.02

CONFORMACION DE BOTADERO

m2

15 15
0 15.01
0 15.02
16 16
0 16.01
0 16.02
17 17
0 17.01

FLETE
FLETE TERRESTRE

GLB

FLETE RURAL

GLB

CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO


CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EMPRESARIGLB
CAPACITACION EN MANEJO DE RIEGO

GLB

FORTALECIMIENTO EN GESTION DE RIEGO


CONSTITUCION, ORGANIZACIN Y O&M DEL SISTEMA DE RIEGO
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%
SUB-TOTAL
IGV 18%
TOTAL PRESUPUESTO

GLB
VARIABLE
NDIRECTO
GG
UTI
ST
IGV

CONFORMACIN DE MONOMIOS
MONOMIOS

I.U.

1 MANO DE OBRA
2 MAQUINARIA Y EQUIPO NACIONAL
3 ACERO
4 CEMENTO
5 TUBERIA
6 GG+UTI

LEYENDA
COSTO TOTALES DE CADA PARTIDAS DEL PRESUPUESTO
COSTO TOTALES DE CADA UNO DE LOS ELEMENTO
DISGREGADO

47
48
30
21
72
39

LA POLINMICA
MANO DE OBRA
Metrado

Precio (S/.)

Parcial (S/.)

OPERARIO OFICIAL

47

47

PEON

toporafo

47

HERRAMIENTAS
MANUALES

carretilla

37

37

1,585.40
1.00

685.40

685.40

18.00

3.00

1.00

900.00

900.00

90.00

1.05

12,327.04
214.20
94.50

12.00

90.00

1.33

119.70

4.80

450.00
2.40

270.00

317.18
8.71

28.25

5.18

13.73

246.06

9.95

71.12

19.91

26.13

5.18

15.54

1,419.22
1.16

407.47

472.67

2.32

2.32

11.60

7.72

122.61

946.55

2.47

2.47

4.94

23.16

###

3.74

336.52

1.66

3.32

8.31

11.22

3,968.45
1,258.58

30.79

20.98

645.97

4.10

474.46

4.35

2,063.90

18.98

18.98

20.53

1423.38

92.37

39.37

17.75

26.25

26.25

196.85

4.80

4.80

9.00

698.82
698.82
1,414.23
3.00

471.41

1,414.23
649.98

3.00

108.33

324.99

6.00

3.00

9.00

3.00

108.33

324.99

6.00

3.00

9.00

3,644.96
43.89
33.00

1.33

43.89

1.76

0.88

99.00

86.23
1.62

28.25

45.77

2.03

19.93

40.46

1.85

3.70

4.86

1.62

6.09

0.25

660.10
1.62

407.47

660.10

3.24

3.24

16.20

4.86

32.00

32.00

64.00

108.00

13.20

990.00

16.00

9.00

16.80

630.00

2,854.74
36.00

44.13

1,588.68

330.00

1.51

498.30

3.00

255.92

767.76

8.00

62,406.92
132.30
126.00

1.05

132.30
10,739.45

189.00

28.25

5,339.25

432.00

567.00

126.00

5.49

691.74

50.40

378.00

236.25

19.93

4,708.46

189.00

708.75

3,313.93

216.01

29.53

12.60

263.01

3,313.93

10.08

10.08

40.32

37.80
322.80

35,474.02
64.56

430.28

27,778.88

103.30

103.30

516.48

179.76

26.28

4,724.09

102.71

102.71

20.55

683.00

4.35

2,971.05

27.32

27.32

88.20

34.30

3,025.26

50.40

25.20

264.60

104.00

34.30

3,567.20

59.43

29.71

312.00

12.60

5.08

64.01

2.10

2.10

25.20

87.00

5.83

507.21

13.92

27.84

261.00

1.00

422.10

422.10

8.00

8.00

8.00

5.00

1.00

439.70

439.70

8.00

8.00

5.00

539.28
2049.00

7,163.68

861.80

4,721.74
62.19
46.76

1.33

62.19

2.49

1.25

140.28

163.61
4.12

18.00

74.16

9.42

20.60

1.42

13.73

19.50

1.42

4.26

3.51

19.93

69.95

2.81

10.53

10.29

13.89

1,764.86
4.63

336.52

1,558.09

2.06

2.52

20.98

52.87

0.34

4.12

35.38

4.35

153.90

1.42

1.42

1.00

2,731.08

2.00

4.00

1.68

7.56
106.14

2,731.08
2,731.08

4.00

3.00

11,948.55
710.22
534.00

1.33

710.22

28.46

14.26

1602.00

170.88

17.65

3,016.03

390.58

512.64

534.00

0.62

331.08

42.72

1602.00

534.00

2.74

1,463.16

42.72

1602.00

21.36

11.75

250.98

128.16

13.73

1,759.64

534.00

7.02

3,748.68

534.00

1.09

582.06

6,820.89

21.36
2.44

24.41

64.08

128.16

384.48

19.44

38.82

2670.00

17.09

25.63

2670.00

0.40

0.80

3.00

4,330.74

86.70
1.00

86.70

86.70
77,676.60
3,100.23

2,331.00

1.33

3,100.23

124.24

62.24

699.30

55,701.58
745.92

17.65

13,165.49

1704.95

2237.76

2,331.00

0.62

1,445.22

186.48

6993.00

2,331.00

2.74

6,386.94

186.48

6993.00

93.24

11.75

1,095.57

10.66

13.32

279.72

1,398.60

24.03

33,608.36

1398.60

1398.60

4195.80

1,490.00

7.02

10,459.80

54.24

108.32

7450.00

841.00

6.60

5,550.60

30.61

61.14

4205.00

2,331.00

1.09

2,540.79

74.59

111.89

11655.00

93.24

18,551.19

0.44

323.60
1.00

323.60

323.60

8.00

8.00

8.00

5.00

124,604.13
4,838.54
3,638.00

1.33

4,838.54

193.91

97.13

10914.00

92,759.90
1,164.16

17.65

20,547.42

3,638.00

0.62

2,255.56

3,638.00

3.14

11,423.32

145.52

11.75

1,709.86

2,364.70

24.03

19953.70

593.72

2182.80

72.76

6839.44

436.56

165.89

1247.11

42.20

56,823.74 23647.00

17735.25

1253.29

1637.10

26,884.82
3,638.00

6.30

22,919.40

1309.68

2000.90

181.90

3,638.00

1.09

3,965.42

1164.16

1309.68

109.14

26.67

20.00

1.40

616.00

924.00

46.20

120.87
1.00

120.87

120.87
62,493.20

77.00

811.60

62,493.20
25,184.01
11.37

8.55

1.33

11.37

3.42

2.31

0.17

20,547.42
1,164.16

17.65

20,547.42

19953.70

593.72

95.52

4.99

122.40

4.65

3,274.88
5.73

336.52

1,928.26

25.44

24.48

20.98

513.59

32.56

45.84

191.50

4.35

833.03

76.60

68.94

172.89

155.52

129.60

22.81

36.00

30.00

5.31

18.00

1.98

3.83

649.81
25.92

25.07

649.81

3.00

120.85

362.55

39.99

3.00

112.66

337.98

48.00

700.53

20,657.77
25.60
19.25

1.33

11.55

17.65

25.60

7.70

5.20

0.39

203.86
203.86

197.97

5.89

3,650.01
7.39

336.52

2,486.88

32.81

55.44

20.98

1,163.13

73.74

27.72

17.75

59.12

123.19

6.43

277.20

10.53

492.03
492.03

184.89

166.32
924.00

17.46

16,286.27
77.00

108.85

8,381.45

1026.41

77.00

102.66

7,904.82

1232.00

770.00

136.29

462.00

50.82

10,894.89
10.21
7.68

1.33

10.21

3.07

2.07

0.15

108.37
6.14

17.65

108.37

105.24

3.13

209.21

10.92

6,039.55
12.55

336.52

4,223.33

55.72

100.40

287.88

4.35

1,252.28

115.15

103.64

5.76

2510.22

26.88

20.98

563.94

35.75

134.40

5.11

536.76
30.24

17.75

536.76

201.70

181.44
144.00

19.05

4,200.00
12.00

247.09

2,965.08

159.96

12.00

102.91

1,234.92

19.20

9.12
144.00

4.92

5,389.82
10.24
7.70

1.33

10.24

3.08

2.08

0.15

108.72
6.16

17.65

108.72

105.58

3.14

51.34

2.68

2,472.62
3.08

336.52

1,036.48

13.68

24.64

233.59

4.35

1,016.12

93.44

84.09

20.02

20.98

420.02

26.63

4.67
100.10

3.80

355.36
20.02

17.75

355.36

133.53

120.12
132.00

12.61

2,442.88
11.00

115.67

1,272.37

146.63

11.00

106.41

1,170.51

22.00

8.36
165.00

5.61

9,562.26
35.70
15.00

1.05

15.75

15.00

15.00

1.33

19.95

6.00

12.44

17.65

0.75
4.05

0.30

219.57
219.57

213.22

6.34

353.25

13.42

6,824.24
70.65

20.98

1,482.24

93.96

548.50

4.35

2,385.98

219.40

197.46

6.87

430.28

2,956.02

109.92

98.93

10.97
412.20

31.05

185.58

69.55

7.80

50.00

5.85

1,114.75
32.50

34.30

1,114.75
1,368.00

5.00

164.10

820.50

66.65

5.00

109.50

547.50

100.00

3.00

1,892.78
7.14
3.00

1.05

3.15

3.00

3.00

1.33

3.99

1.20

0.15
0.81

0.06

43.95
2.49

17.65

43.95

42.68

1.27

70.65

2.68

1,363.13
14.13

20.98

296.45

18.79

109.70

4.35

477.20

43.88

39.49

1.37

430.28

589.48

21.92

19.73

2.19
82.20

6.19

13.91

1.56

222.95
6.50

34.30

222.95

37.12

255.61
1.00

146.11

146.11

13.33

1.00

109.50

109.50

20.00

12.00

0.76
0.60

8,368.80
1.00

4,500.00

4,500.00

240.00

16.12

3,868.80

64.80

48.00

2.40

31,500.00
1.00

23,000.00

23,000.00

1.00

8,500.00

8,500.00

1.00

3,500.00

1.00

700.00

4,200.00
3,500.00
700.00
3,400.00
1.00

3,400.00

3,400.00
34012.49 5077.4349

474,092.17
33,186.45
COEFICIENTE DE
INCIDENCIA (insumos)
23,704.61
530,983.23 Suma de I.U. semejantes
95,576.98 la suma debe ser al 100%
626,560.21

OS

0.06406

0.00956

83233.35

194.681292

80712.4081

2540.44375

0.15675

0.00037

0.15201

0.00478

0.23074
0.85927

FRMULA POLINMICA
COEFICIENTE DE
INCIDENCIA

0.34617
=0.08312/
+0.50105( )/( )+0.08605( )/( )+0.07728/+0.14536
0.19071
0.13873
0.02683
0.04969
0.10714
0.85927

equipo
ezclaora e
ezclaora e
vibraor e concreto
concreto tropo 8p
concreto e 9-11p3
4p 240"
9p3
48

49

48

copactacion y
vibraor tipo
planca 4p

ira y jalone

49

37

boba anual
para prueba
e tuberia
48

cartele e bra
iprea lina fibra
eun ieo

teoolito

30

65

1.00

2.40

2.40

0.88

0.88

2.59
###
2.47
1.66

1.66

1.62

25.20

10.08
51.65

1.25

1.20

14.26

14.26

0.71

2.06

2.06

64.08

17.09

62.24

62.24

699.30

74.59

97.13

97.13

14188.20

1382.44

114.60

147.80

1.45

3.25

3.27

7.32

1.31

2.92

63.66

82.10

139.43

251.00

34.22

1.31

2.93

2.55

5.70

0.51

1.14

61.60

164.88

32.88

281.448176

323.130276

562.008

14980.08

188.563292

1474.12

201.364332

0.00053

0.00061

0.00106

0.02821

0.00036

0.00278

0.00038

0.00000

0.19071

+0.07728/+0.14536( )/( )+0.10714( )/( )

tapa etalica
tapa etalica
0.45x0.45
0.40x0.40
e=1/8"(incluio e=1/8 incluio
arco)
arco
65

65

tapa etalica
0.80x0.80n
e=1/8"
65

tapa etalica
0.50x0.80n
e=1/8"
65

tapa etalica
tapa etalica
0.60x1.1n
0.40x0.60
e=1/8" incluio e=1/8 incluio
arco
arco
65

65

tapa etalica
0.60x0.60
cono e reboe
valvula e
e=1/8 incluio
pvc 6"x4" copuerta bb4"
arco
65

77

3.00
3.00
3.00

6.00

270.00

6160.00

1066.80

977.90

444.50

88.90

6160

1066.8

1422.4

270

88.9

0.01160

0.00001

0.00201

0.00268

0.00051

0.00017

0.00001

0.00001

0.00001

tee pvc al
3"x3"

union iple pvc coo e fierro e


ap 3"
1 1/2"x90

72

72

3.00

6.00

coo ovc ap
4"x90"

nilpe pvc ap
4" 1.00
72

6.00

9.00

niple e f
niple e fo oe
alvanizao e 1
3"x9"
1/2"x1 1/2"
65

canatilla 3"

65

12.00

union univeral
e fo alvanizao
e 1 1/2"
65

3.00

4.00

2.00

288.00

110.00

1152.00

110

288

12

1152

0.00002

0.00001

0.00021

0.00001

0.00002

0.00054

0.00002

0.00001

0.00217

union univeral
e fo alv 3"
65

acero e
refuerzo
fy=4200 rao
60

clavo para
aera c/c 2"
2

aera tornillo
inc/corte
p/encofrao
43

alabre nero
recocio #8

alabre nero
#8
2

alabre nero alabre recocio


#16
#8
2

110.23
507.67
0.79
12.00

28.47

clavo para
aera c/c 3"

9.24

5.23

30.56

643.54
730.81

12.58

30.56
40.98

9.02
37.86

0.76
2.12

0.43

306.73
635.78

694.66
2.22

955.76

30.11

17.14

68.19

38.81

47.88

71.97

336.81

33.06

18.82

2.42

775.52

58.40
250.85

24.62

885.24

86.90

14.01

1.60

1821.02

177.05
364.20

49.46
137.13

17.38

9.89
27.43

12

37.585

5828.6232

3414.1386

128.904

12.5832

414.3629

141.357

184.3419

0.00002

0.00007

0.01098

0.00643

0.00024

0.00002

0.00078

0.00027

0.00035

MATERIALES
ceento
portlan
tipo i

piera rane e
etaca e
yeo e 28k
8"
aera
5

30

43

0.90

0.90

arena fina orion

21

8.12
3.86

cuarton e
alabre e
eucalipto
pua #16
3"x3"x2.5

aua

38

39

1.11

0.10

45

canao
incluio
alaba
2

puerta e
calaina e
1.85x1
26

30

6.72
31.53

4.72

0.33

3.63

0.69

1.56

0.15

0.63

0.33

115.02

93.60
330.00
3.00

ipereabiliz
ante cea o
iilar

3.00

36.54

15.75

1.85

629.46

67.79

13.56

53.36

2.12

793.80

17.64

62.92

2.50

0.94

20.80

0.17

0.47

0.47

39.03

4.49

0.86

1.00

32.04

16.02

23.31

23.31

1.00

36.38

36.38

0.51

0.26

1019.20

109.38

1.16

3.21

716.83

4.14

1217.35

7.03

59.62

0.58

1314.46

70.13

0.46

555.81

51.00

0.23

2232.27

76.51

0.46

55.64

0.23

547.84

50.65

0.90

1.72

721.35

4.33

36.84

0.45

1413.37
415.03

0.18

298.76

89.70

0.98

136.50

0.09

281.85
83.01

143.85
17.94

0.86
0.20

27.30

3.86

97.0984

0.00001

0.00018

79.243 8594.384 316.15592 3754.9921 834.40565


0.00015

0.01619

0.00060

0.00707

0.00157

93.6

330

202.24

0.00018

0.00062

0.00001

0.00001

0.00038
0.43783

MATERIALES
junta inper
afalto
water top
liquio rcneoprene
250
9"

aitivo
epoxico
ika 32
30

30

peaento
para pvc
13

30

cono e
canatilla e
cinta teflon reboe
alia e 3"
epvc 3"

aaptaor
para pvc
ap 1 1/2"

aaptaor
para pvc
ap 3"

valvula
cono e 90 copuerta e
pvc ap 3" bronce e 1
1/2"

valcula
copuerta e
bronce e
3"
77

13.23
15.60
13.23
11.57
0.01
0.01

5.34

14.90
8.41

2.00

4.00
4.00

4.00

5.00
5.00

4.00

170.00

2546.60

346.50

11.25

288.75

60.00

616.00

180.00

4620.00

84.00

108.00

96.00

660.00

66.00

88.00

605.88

209.63
7.00

350.00

91.00

250.00

41.93
0.02

20.00

60.00

280.38

13.23

11.571

2666.27

352

828.52

95

800

340

5885.88

410

0.00053

0.00002

0.00002

0.00502

0.00066

0.00156

0.00018

0.00151

0.00064

0.00001

0.01108

0.00077

0.43783

rapa

alla cocaa
rollizo e
2" e alabre tierra
eucalipto e
alvanizao cernia
5"
e 8bw=2.0
41

30

tuberia pvc
tuberia pvc
reuccion
ap preion
ap preion
pvc
1.5" clae
3" clae 7.5
1.1/2"x1"
7.5
4

72

72

72

reuccion
pvc ap 3"
72

coo pvc
ap(aua)co
n roca
3"x90"

reuccion
pvc ap
3"a2"
72

72

tee pvc
con
reuccion
3"-2"

tee pvc
con
reuccion
3"-1 1/2"
72

72

35.00

52.50

40.00

26.70
1.07

550.02

2.00

116.55
4.66

1534.70
866.23

4.00

2.00

254.66

16880.32

1.00

38.50

9.00

35

52.5

40

403.64

0.00007

0.00010

0.00008

0.00076

2950.95 16880.32
0.00556

0.03179

38.5

0.00007

0.00002

0.00000

0.00001

0.00000

0.00000

coo pvc
con
reuccion
3"-2"

yee pvc
yee pvc
yee pvc
coo e
c/reuccion c/reuccion c/reuccion tee pvc 3" fierro e
3"-2"
2"-1 1/2" 3"-1 1/2"
3"x90
72

72

72

72

72

aperor
elevaor f
bronce
quebracorr e
coo pv ap coo pv ap coo pv ap ectoral
o e bronce 3/4"x80n
1 1/2x90 45 1 1/2 22 1 1/2 3/4" ilver
e 3/4"
conexin
boquilla
aco
4nn
65
72
72
72
30
30
49

1.00

1.00

8.00

2.00

1.00

20.80

15.60

36.40
24640.00

1540.00

7700.00

10.00

10

20.8

15.6

36.4

24640

1540

7700

0.00000

0.00000

0.00002

0.00000

0.00000

0.00002

0.00004

0.00003

0.00007

0.04640

0.00290

0.01450

llave pvc
tripoe
llave tipo tipo
anotable e
tee e 1/2" bayoneta
3/4"
e 3/4"

anuera
coo p.e.
tee p.e.
platica e
32nnx3/4" 32nnx3/4"
3/4"
72

72

tee pvc ap tee pvc ap tierra e


tapon pvc
rocao 1
e 3" c/r
cacra o
e 3/4"
1/2"
para aua veetal
72

72

72

botaero

reniiento

3.00

15400.00

1270.50

770.00

770.00

8470.00

264.00

38.50

14.00

38.50

7.00

4500.00
153.60

3600.00

23000.00
8500.00
3500.00
700.00
3400.00
15400

264

1270.5

770

770

8470

52.5

38.5

153.6

0.02900

0.00050

0.00239

0.00145

0.00145

0.01595

0.00010

0.00007

0.00001

0.00029

3600 43603.00
0.00678

0.08212

GG+UTI

SUB TOTAL

39

22.00 4.14E-005
3.00 5.65E-006

462.00 0.0008701
283.81 0.0005345
55.99 0.0001055
23.31 4.39E-005
30.22 5.69E-005
46.09 8.68E-005
63.69 0.0001199
241.70 0.0004552
1997.48 0.0037618
255.49 0.0004812
78.60 0.000148
21 3.95E-005
21 3.95E-005

104.0622 0.000196
10.41 1.96E-005
7.96775 1.50E-005
145.88 0.0002747
329.6016 0.0006207
1333.20 0.0025108
38.9991 7.34E-005

646.80 0.0012181
1215.0054 0.0022882
453.6 0.0008543
927.28 0.0017463

162.50 0.000306
1808.33 0.0034056
1482.50 0.002792
2875.43 0.0054153
1220.34402 0.0022983
503.89 0.000949
42.63 8.03E-005
314.505 0.0005923
44.01 8.29E-005
208.01 0.0003917

147.41 0.0002776
30.017084 5.65E-005
6.39 1.20E-005
13.78 2.59E-005
78.84 0.0001485
19.78 3.73E-005
148.95 0.0002805
142.5 0.0002684

1721.2956 0.0032417
903.22 0.001701
1644.72 0.0030975
1692.78 0.003188
92.001792 0.0001733
576.72 0.0010861
3283.6194 0.006184
2729.808 0.005141
12.20 2.30E-005

1056.8754 0.0019904
3942.71 0.0074253
7179.48 0.0135211
7389.27 0.0139162
308.363328 0.0005807
7692.30 0.0144869
9162.16 0.0172551
5171.39 0.0097393
11916.072 0.0224415

45.00 8.47E-005

11472.0692 0.0216053
20547.42 0.0386969
2255.56 0.0042479
11423.32 0.0215135
1709.86 0.0032202
56823.74 0.1070161
22919.40 0.0431641
3965.42 0.0074681
120.87 0.0002276
62493.20 0.1176934

11.37 2.14E-005
20547.42 0.0386969
1928.26 0.0036315
513.59 0.0009672
833.03 0.0015688
649.81 0.0012238
362.55 0.0006828
337.98 0.0006365

25.60 4.82E-005
203.86 0.0003839
2486.88 0.0046835
1163.13 0.0021905
492.03 0.0009266
8381.45 0.0157848
7904.82 0.0148871

10.21 1.92E-005
108.37 0.0002041
4223.33 0.0079538
1252.28 0.0023584

563.94 0.0010621
536.76 0.0010109
2965.08 0.0055841
1234.92 0.0023257

10.24 1.93E-005
108.72 0.0002048
1036.48 0.001952
1016.12 0.0019137
420.02 0.000791
355.36 0.0006692
1272.37 0.0023963
1170.51 0.0022044

15.75 2.97E-005
19.95 3.76E-005
219.57 0.0004135
1482.24 0.0027915
2385.98 0.0044935
2956.02 0.0055671
1114.75 0.0020994
820.50 0.0015452
547.50 0.0010311

3.15 5.93E-006
3.99 7.51E-006
43.95 8.28E-005
296.45 0.0005583
477.20 0.0008987
589.48 0.0011102
222.95 0.0004199
146.11

0.00028

109.50

0.00021

4500.00

0.00847

3868.80

0.00729

23000.00

0.04332

8500.00

0.01601

3500.00

0.00659

700.00

0.00132

3400.00

0.00640

56,891.06

456260.22

0.85927

0.10714

0.85927

CONFORMACIN DE MONOMIOS
MONOMIOS

MANO DE OBRA

OPERARIO

0.09995

OFICIAL
PEON
TOPOGRAFO

0.02051
0.23678
0.00342

CARTELES DE OBRA IMPREA LAMINA


FIBRA SEGN DISEO

0.00094

MADERA TORNILLO inc/corte p/encofrado


ESTACA DE MADERA
CUARTON EUCALIPTO 3"x3"x2.5
CANDADO INCLUIDO ALDABA
PUERTA DE CALAMINA DE 1.85x1

0.01429
0.00038
0.00088
0.00019
0.00124

GRAPA
ROLLIZO DE EUCALIPTO DE 5"
TIERRA CERNIDA
MANGUERA PLASTICA DE 3/4"
CINTA TEFLON
TIERRA DE CHACRA O VEGETAL
BOTADERO
RENDIMIENTO

0.00036
0.00237
0.01030
0.01595
0.00157
0.00029
0.00678
0.08381

HERRAMIENTAS MANUALES

0.01205

CARRETILLA
MEZCLADORA DE CONCRETO DE 9-11p3
VIBRADOR DE CONCRETOo 4p 240"

0.01099
0.00205
0.00084

MAQUINARIA Y
DE CONCRETO TROMPO
EQUIPO NACIONAL MEZCLADORA
8p 9p3
COMPACTACION Y VIBRADOR TIPO
PLANCHA 4hp

0.04462

MIRA Y JALONES

0.00216

BOMBA ANUAL PARA PRUEBA DE


TUBERIA

0.00465

TEODOLITO

0.00482

TAPA METALICA 0.45x0.45 e=1/8"(incluido


marco)

0.01160

TAPA METALICAa 0.40x0.40 e=1/8 incluido


marco

0.00045

TAPA METALICA 0.80x0.80n e=1/8"


TAPA METALICA 0.50x0.80m e=1/8"

0.00201
0.00268

TAPA METALICA 0.60x1.1n e=1/8" incluio


marco

0.00051

TAPA METALICA 0.40x0.60 e=1/8 incluio


marco
TAPA METALICA 0.60x0.60 e=1/8 incluio
marco
CONO DE REBOE PVC 6"x4"
VALVULA COMPUERTA BB4"
CODO DE FIERRO de 1 1/2"x90
CODO PVC SAP 4"x90"
NIPLE DE f GALVANIZADO DE 1 1/2"x1 1/2"
NIPLE e fo DE 3"x9"

BRONCE

0.00388

0.00017
0.00045
0.00010
0.00085
0.00021
0.00017
0.00054
0.00028

BRONCE

CEMENTO

TUBERIA

CANASTILLA 3"
UNION UNIVERSAL DE fo GALVANIZADO
DE 1 1/2"
UNION UNIVERSAL DE fo GALV 3"
CLAVO PARA MADERA c/c 2"
ACERO DE REFUERZO fy=4200 GRADO 60
ALAMBRE NEGRO RECOCIDO NEGRO #8
OALAMBRE NEGRO #8
ALAMBRE NEGRO #16
ALAMBRE RECOCIDO #8
CLAVO PARA MADERA c/c 3"
ALAMBRE DE PUAS #16
CANASTILLA DE SALIDA DE 3"

0.00020
0.00217
0.00042
0.00025
0.01176
0.00024
0.00010
0.00121
0.00032
0.00056
0.00075
0.00079

VALVULA DE COMPUERTA DE BRONCE DE


1 1/2"

0.01108

VALVULA DE COMPUERTA DE BRONCE DE


3"

0.00077

MALLA COCADA 2" DE ALAMBRE


GALVANIZADO 8bw=2.0

0.00188

CODO DE FIERRO DE 3"x90

0.00002

ASPEROR BRONCE SECTORAL 3/4"


SILVER BOQUILLA 4MM

0.04640

QUEBRACHORRO DE BRONCE DE 3/4"

0.00290

ELEVADOR f e 3/4"X80m conexin de


marco

0.01450

TRIPODE ANGOTABLE DE 3/4"


PIEDRA GRANDE DE 8"
YEO DE 28k
CEMENTO PORTALND TIPO I
ARENA FINA
HORMIGON
AGUA
IMPERMEABILIZANTE
ADITIVO EPOXICO SIKA 32
ASFALTO LIQUIDO rc-250
TEE PVC SAL 3"x3"
UNION NIPLE PVC SAP 3"
NIPLE PVC SAP 4" 1.00
JUNTA INTER WATER TOP NEOPRENE 9"
PEGAMENTO PARA PVC
CONO DE REBOSE DE PVC 3"
ADAPATADOR PARA PVC SAP 1 1/2"
aADAPATADOR PARA PVC SAP 3"
CONO DE 90 PVC SAP 3"
TUBERIA PVC AP PRESION 3"CLASE 7.5
TUBERIA PVC AP PRESION 1.5" CLASE 7.5
REDUCCION PVC 1.1/2"x1"
REDUCCION PVC SAP 3"
REDUCCION PVC SAP 3"a2"
CODO PVC SAP(aua)con roca 3"x90"
TEE PVC CON REDUCCION 3"-2"
TEE PVC CON REDUCCION 3"-1 1/2"
TEE PVC CON REDUCCION 3"-2"
YEE PVC c/reuccion 3"-2"
YEE PVC c/reuccion 2"-1 1/2"
YEE PVC c/reuccion 3"-1 1/2"
TEE PVC 3"
CODO DE PVC SAP 1 1/2x90
CODO DE PVC SAP 45 1 1/2
CODO DE PVC SAP 22 1 1/2
CODO p.e. 32mmx3/4"

0.02900
0.00015
0.00076
0.04920
0.00176
0.02591
0.00015
0.00183
0.00281
0.00027
0.00024
0.00012
0.00025
0.00005
0.00875
0.00031
0.00151
0.00081
0.00006
0.02826
0.03179
0.00007
0.00002
0.00002
0.00005
0.00002
0.00001
0.00001
0.00001
0.00009
0.00003
0.00001
0.00004
0.00003
0.00007
0.00145

GG+UTI

LLAVE TIPO TEE DE 1/2"


LLAVE PVC TIPO BAYONETA DE 3/4"
TEE p.e. 32mmx3/4"
TAPON PVC DE 3/4"
TEE PVC SAP ROSCADO 1 1/2"
TEE PVC AP DE 3" c/r para agua
GG+UTI

0.00050
0.00239
0.00145
0.00010
0.00007
0.00001
0.10714