This document provides instructions for a black out/restart procedure and bypass procedure for a UPS CEG system. The black out/restart procedure is a 10 step process that involves turning off various system components, ensuring capacitors and LEDs are in the proper state, inputting power from the bypass line and source, waiting for synchronization, and checking parameters. The bypass procedure is an 8 step process that uses the static switch logic and transfer load settings to manually bypass the UPS for maintenance before returning the system to normal operation.
This document provides instructions for a black out/restart procedure and bypass procedure for a UPS CEG system. The black out/restart procedure is a 10 step process that involves turning off various system components, ensuring capacitors and LEDs are in the proper state, inputting power from the bypass line and source, waiting for synchronization, and checking parameters. The bypass procedure is an 8 step process that uses the static switch logic and transfer load settings to manually bypass the UPS for maintenance before returning the system to normal operation.
This document provides instructions for a black out/restart procedure and bypass procedure for a UPS CEG system. The black out/restart procedure is a 10 step process that involves turning off various system components, ensuring capacitors and LEDs are in the proper state, inputting power from the bypass line and source, waiting for synchronization, and checking parameters. The bypass procedure is an 8 step process that uses the static switch logic and transfer load settings to manually bypass the UPS for maintenance before returning the system to normal operation.
Turn OFF QRB/ QRA Turn OFF QI A/ QI B Make Sure Capacitor Prechanrge is ON Condition. Make Sure VDC input ON LED is OFF Release Trip on QB A/ QB A with open Relay on TB 10 Terminal 1,2,3,4 FU 10 A/B and FU 10 A/B is OPEN. 7. After VDC input ON LED OFF, Turn ON QB A/QB B. 8. Turn ON QIA / QIB (Inverter) side, Wait until LED Hz EM.Line Anomal, LED VAC Output Anomal, LED VAC EM.Line Anomal, Must be Lite ON. 9. Input By Pass line from Source 10.Wait Until Syncronize 11.Input from Source mec is Normal 12.Turn ON QR A/ QR B. 13.Check Parameter from PD Cam 14.Finish.
Cara Untuk Mem By Pass QBY
1. QBY kondisi Normal
2. Static Switch Logic kondisi Auto Press Comutat Test di Inverter Logics Side. 3. Maka Card Static Switch akan ON selama Beberapa Saat, kemudian akan kembali OFF Lagi. 4. Pindahkann Re-Transfer Load di Static Swicth Logic ke Kondisi Manual. 5. Press Comutat Test di inverter logic, maka LED di Card akan pindah ke By Pass . 6. Pindahkan QBY ke posisi 3 By Pass, maka beban akan disupplay melalui ByPass line. 7. Setelah Maintenace UPS Selesai Kembali QBY ke posisi 1 Normal. 8. Pindahkan Re-Transfer Load ke posisi Auto setelah memencet Reset Load terlebih dahulu. Maka system akan kmbali normal.