Black Out/ Restart Procedure UPS CEG

1.
2.
3.
4.
5.
6.

Turn OFF QBB/ QBA


Turn OFF QRB/ QRA
Turn OFF QI A/ QI B
Make Sure Capacitor Prechanrge is ON Condition.
Make Sure VDC input ON LED is OFF
Release Trip on QB A/ QB A with open Relay on TB 10 Terminal 1,2,3,4 FU
10 A/B and FU 10 A/B is OPEN.
7. After VDC input ON LED OFF, Turn ON QB A/QB B.
8. Turn ON QIA / QIB (Inverter) side, Wait until LED Hz EM.Line Anomal, LED
VAC Output Anomal, LED VAC EM.Line Anomal, Must be Lite ON.
9. Input By Pass line from Source
10.Wait Until Syncronize
11.Input from Source mec is Normal
12.Turn ON QR A/ QR B.
13.Check Parameter from PD Cam
14.Finish.

Cara Untuk Mem By Pass QBY

1. QBY kondisi Normal


2. Static Switch Logic kondisi Auto Press Comutat Test di Inverter
Logics Side.
3. Maka Card Static Switch akan ON selama Beberapa Saat, kemudian akan
kembali OFF Lagi.
4. Pindahkann Re-Transfer Load di Static Swicth Logic ke Kondisi
Manual.
5. Press Comutat Test di inverter logic, maka LED di Card akan pindah ke By
Pass .
6. Pindahkan QBY ke posisi 3 By Pass, maka beban akan disupplay melalui
ByPass line.
7. Setelah Maintenace UPS Selesai Kembali QBY ke posisi 1 Normal.
8. Pindahkan Re-Transfer Load ke posisi Auto setelah memencet Reset Load
terlebih dahulu. Maka system akan kmbali normal.