Sei sulla pagina 1di 276

MASTER

DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
1
2
3
4

TRY
TRY
TRY
TRY

MDL
Boiler
Boiler
Boiler

Err:512
Err:512
BTG-XXX-SCH-M-0001
BTG-BLA-DWG-E-0001

40-SCH-MDL-001

TRY

Boiler

BTG-HAC-DWG-M-0002

0-00-047-48526

SCHEME OF START-UP & ECONOMISER CIRCUIT WITH


VALVES, FITTINGS AND INSTRUMENTATIONS

TRY

Boiler

BTG-HAD-DWG-M-0003

0-00-047-48527

SCHEME OF EVOPARATOR & SEPARATOR CIRCUIT WITH


VALVES, FITTINGS AND INSTRUMENTATIONS

TRY

Boiler

BTG-HAH-DWG-M-0004

0-00-047-48528

SCHEME OF SUPER-HEATER CIRCUIT WITH VLAVES,


FITTINGS AND INSTRUMENTATIONS

TRY

Boiler

BTG-HAJ-DWG-M-0005

0-00-047-48529

SCHEME OF RE-HEATER CIRCUIT WITH VLAVES, FITTINGS


AND INSTRUMENTATIONS

TRY

Boiler

BTG-HAG-DWG-M-0006

0-00-047-48530

SCHEME OF BOILER WATER CIRCULATING PUMP WITH


VALVES, FITTINGS AND INSTRUMENTATIONS

10

TRY

Boiler

BTG-HCB-SCH-M-0007

4-00-047-75832

VALVES SCHEDULE FOR WATER, STEAM, CIRCULATING


PUMPS AND SB SYSTEMS

11

TRY

Boiler

BTG-XXX-DWG-M-0425

1-97-291-90591

SCHEME OF PULVERISER SYSTEM WITH INSTRUMENTATION

12

TRY

Boiler

BTG-XXX-DWG-M-0426

0-97-288-90873
0-97-288-90874

SCHEME OF AIR & FLUE GAS SYSTEM WITH


INSTRUMENTATION

13

TRY

Boiler

BTG-HJF-DWG-M-0427

0-00-056-11034

SCHEME OF FUEL OIL AND GAS WITH INSTRUMENTATION

14

TRY

Boiler

BTG-XXX-SCH-M-0008

FS/1713-1714/VLV_SCH

SCHEDULE OF VALVES AND FITTINGS

15

TRY

Boiler

BTG-XXX-DWG-M-0428

0-00-047-48531

SCHEME OF SOOT BLOWER PIPING WITH VALVES, FITTINGS


AND INSTRUMENTATION

16

TRY

Boiler

BTG-HBK-DWG-M-0009

0-00-020-76298

KEY PLAN OF BOILER

17

TRY

Boiler

BTG-HBK-DWG-M-0010

0-00-022-76299 to
0-00-022-7204

GA OF BOILER SECTIONAL ELEVATION AND PLAN

18

TRY

Boiler

BTG-HNC-DWG-M-0011

0-00-020-7215
0-00-020-7216

LAYOUT OF ID SYSTEM

19

TRY

Boiler

BTG-UHA-DWG-M-0417

0-00-022-7201

GA OF BOILER FRONT ELEVATION

20

TRY

Boiler

BTG-UHB-DWG-M-0418

3-00-020-70182

BOILER EQUIPMENT DESIGNATION

21

TRY

Boiler

BTG-HBK-DSH-M-0012

CPT-1101

BOILER PERFORMANCE PARAMETER

22
23
24

TRY
TRY
TRY

Boiler
Boiler
Boiler

BTG-XXX-DSH-M-0013
BTG-XXX-DSH-M-0014
BTG-LA-QAP-M-0015

CPT-1102
CPT-1103
CPT-1215

FUEL ANALYSIS
SITE CONDITION
RECOMMENDED QUALITY OF FEED WATER

25

TRY

Boiler

BTG-HBK-DSH-M-0016

CPT-1806

ANTICIPATED PERFORMANCE DATA FOR BOILER

26

TRY

Boiler

BTG-HBK-CAL-M-0017

BCR-1011

FURNACE PERFORMANCE & SIZING CALCULATIONS

27

TRY

Boiler

BTG-HA-DSH-M-0018

BCR-1014

SH/RH/ECO PERFORMANCE / ARRANGEMENT SKETCH/DATA


ALONG WITH MATERIAL DETAILS

28

TRY

Boiler

BTG-UHB-DWG-S-0001

0-00-281-2247
0-00-281-26253

BOILER FOUNDATION PLAN

29

TRY

Boiler

BTG-UMC-DWG-S-0002

0-00-291-26261
0-00-291-26262
0-00-291-2258
1-00-291-01010

FOUNDATION PLAN-ID SYSTEM SUPP STRUCTURE

PL: C3 - PS / 1713
3-96-186-14356 to
3-96-186-14368

MASTER DRAWING LIST-TRY


QUALITY PLAN
Painting Schedule
SB MCC SINGLE LINE DIAGRAM

TRY
TRY

Boiler
Boiler

BTG-HDA-DSH-M-0019
BTG-HLB-CAL-M-0020

CPT- 1305
BCR-1023

ASH COLLECTION DATA FOR BOILER


FD FAN SIZING CALCULATION & PER CURVES

32

TRY

Boiler

BTG-HNC-CAL-M-0021

BCR-1024

ID FAN SIZING CALCULATION & PER CURVES

33

TRY

Boiler

BTG-HFE-CAL-M-0023

BCR-1025

PA FAN SIZING CALCULATION & PER CURVES

34
35
36
37

TRY
TRY
TRY
TRY

Boiler
Boiler
Boiler
Boiler

BTG-HLD-DSH-M-0024
BTG-HFC-CAL-M-0025
BTG-XXX-CAL-M-0026
BTG-XXX-DSH-M-0429

BCR-1027
BCR-1030
BCR- 1005
BCR- 1016

AIR PREHEATER EQUIPMENT DATA


MILL SIZING CALCULATION
DUCT DESIGN DATA AND CALCULATION
SAFETY VALVE SIZING & SELECTION

38

TRY

Boiler

BTG-HBK-DSH-M-0027

2-00-056-10391

BOILER AREA- TERMINAL POINT DETAILS

39

TRY

Boiler

BTG-HBK-DSH-M-0028

1-00-201-06929

TP DETAILS-FURNACE BOTTOM SEAL PLATE ASY

40

TRY

Boiler

BTG-HFC-DWG-M-0419

0-43-000-0027

MILL PLANT ARRANGEMENT

41

TRY

Boiler

BTG-ERA-DWG-M-0029

0-47-260-02488
2-47-260-01719

LAYOUT OF PULVERISED FUEL PIPING

42

TRY

Boiler

BTG-HBK-DWG-M-0030

0-00-021-7217 to
0-00-021-7241

BOILER FLOOR PLAN ARRANGEMENT

43

TRY

Boiler

BTG-UFG-DWG-S-0003

TRY

Boiler

TRY
TRY

Boiler
Boiler

Err:512
BTG-XXX-DWG-M-0031

47

TRY

Boiler

BTG-HFC-DSH-M-0032

48

TRY

Boiler

49

TRY

50

TRY

1 (i)
2 (i)
2 (i)
2 (ii)

COMP_S

LNTP
LNTP
LNTP
LNTP

2 (vi)
A

A
A
I
A
A
A
A
A
A
I
I
I
I
I
I

2 (vi)

LNTP

2 (vi)

A
A
I
I
I
I
I
I
A
I
I

2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vii)
2 (vii)
2 (vii)
2 (vii)
2 (vii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

LNTP

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)
4 (ii)
4 (ii)
4 (ii)
4 (ii)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

6 (iii)
Readiness of
release
fabrication
drawings will
be
demonstrated.

Bunker bay structure fabrication drawing ready for release for


fabrication

3-97-291-94301

M & C RECOMMENDATIONS - PULVERISER SYSTEM

BTG-HBK-DWG-M-0033

CPT-1801

BOILER PERFORMANCE CURVES

Boiler

BTG-XXX-DWG-M-0034

CPT-1804

COMBINED BOILER TURBINE START UP CURVES

Boiler

BTG-HCB-PCD-I-0001

CI: 1713: SBC

SB CONTROL WRITE UP

13-Sep-13

11-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

15-Sep-13

13-Sep-13

18-Feb-14

15-Sep-13

13-Sep-13

1-Nov-13

24-Feb-14

3-Mar-14

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

15-Sep-13

6-Sep-13

1-Nov-13

15-Sep-13

6-Sep-13

27-Nov-13

15-Sep-13

6-Sep-13

1-Oct-13

15-Sep-13

6-Sep-13

27-Nov-13

15-Sep-13

6-Sep-13

5-Dec-13

15-Oct-13

16-Oct-13

25-Oct-13

15-Oct-13
15-Oct-13
15-Oct-13

16-Oct-13
16-Oct-13
16-Oct-13

8-Jan-14
31-Dec-13
31-Dec-13

15-Oct-13

24-Oct-13

27-Jan-14

15-Oct-13

16-Oct-13

1-Nov-13

15-Oct-13

16-Oct-13

31-Dec-13

15-Oct-13

16-Oct-13

14-Nov-13

15-Oct-13

16-Oct-13

14-Nov-13

After LU
After LU
NTP
NTP
NTP
NTP

R3SUB_A_DT

10-Oct-13
4-Apr-14
11-Jun-14
1-Jan-14

4-Nov-13
11-Apr-14
4-Jul-14
11-Feb-14

19-Apr-14
16-Jul-14
26-Mar-14

20-Apr-14

21-Apr-14

16-Dec-13

10-Feb-14

24-May-14

9-Jun-14

16-Dec-13

9-Jun-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

26-Mar-14

16-Jun-14

7-Dec-13

3-Mar-14

7-Dec-13

11-Feb-14

C
B

7-Dec-13

11-Feb-14

E
B
C
C
C
C

A
B
B
B

6-Apr-14

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

16-May-14

23-May-14

16-Jul-14

5-Jun-14

4-Jul-14

5-Jun-14

4-Jul-14

24-May-14

10-Jun-14

A
A

A
A
A
A
C
B

23-May-14

4-Jul-14

26-Mar-14

3-Apr-14

24-Feb-14

3-Mar-14

A
B

16-Jul-14
16-Dec-13

10-Feb-14

7-Dec-13

15-Feb-14

19-Dec-13

10-Feb-14

7-Dec-13

12-Mar-14

1-Jan-14

10-Feb-14

5-Nov-13

8-Jan-14

28-Jan-14

6-Feb-14

26-Mar-14

22-Apr-14

1-Jan-14

13-Feb-14

28-Jan-14

3-Feb-14

28-Jan-14

12-Mar-14

B
B
B
B
B

16-Jul-14
24-Feb-14

3-Mar-14

5-Jun-14

4-Jul-14

24-Feb-14

3-Mar-14

28-Jan-14

6-Feb-14

24-May-14

10-Jun-14

26-Mar-14

10-Jun-14

5-Jun-14

4-Jul-14

5-Jun-14

4-Jul-14

B
B
B

E
C
B
E

E
E
C

B
B

16-Jul-14

LNTP

I
A

15-Sep-13

LNTP
3 (v)

6 (ii)
Readiness of
release
fabrication
drawings will
be
demonstrated.

O & M MANUAL
PERFORMACE GAURANTEE TEST PROCEDURE

11-Nov-13

R2SUB_A_DT R2APP_A_DT R2APP


CAT

LNTP

3 (v)

13-Sep-13

LNTP
2 (vi)

15-Sep-13

C
C
B

R1SUB_A_DT R1APP_A_DT R1APP


CAT

LNTP

3 (iii)

24-Sep-13
31-Jan-14
19-Dec-13
19-Nov-13

LNTP
2 (vi)

26-Aug-13
25-Sep-13
16-Oct-13
25-Sep-13

FAPP
CAT

2 (vi)

14-Aug-13
10-Sep-13
15-Oct-13
14-Aug-13

LNTP
2 (vi)

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

Boiler structure fabrication drawing (tier 1 & 2) ready for release for
fabrication

BTG-XXX-DWG-S-0004

45
46

I
A
A

30
31

44

LNTP
Purpose reference
(I/ A)

B
15-Nov-13
15-Nov-13

13-Nov-13
13-Nov-13

8-Jan-14
31-Dec-13

15-Nov-13

13-Nov-13

31-Dec-13

15-Nov-13

13-Nov-13

31-Dec-13

15-Nov-13
15-Nov-13
15-Nov-13
15-Nov-13

13-Nov-13
13-Nov-13
13-Nov-13
13-Nov-13

1-Jan-14
31-Dec-13
27-Jan-14
31-Jan-14

15-Nov-13

13-Nov-13

1-Jan-14

15-Nov-13

13-Nov-13

1-Jan-14

15-Nov-13

13-Nov-13

24-Dec-13

15-Nov-13

13-Nov-13

1-Jan-14

15-Nov-13

19-Nov-13

8-Jan-14

27-Jan-14

17-Jan-14

27-Jan-14

17-Jan-14

B
B
B
B
B
E
B

F
28-Jan-14
28-Jan-14

14-May-14
7-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

7-Feb-14

24-Feb-14

7-Mar-14

14-Aug-14

24-May-14

4-Jul-14

28-Jan-14

3-Feb-14

6-Feb-14

19-Feb-14

28-Jan-14

6-Feb-14

B
C

28-Jan-14

6-Feb-14

28-Jan-14

6-Feb-14

B
B

26-Mar-14

3-May-14

24-Feb-14

22-Mar-14

F
F

14-Aug-14
15-Feb-14

1 OF 276

E
23-May-14

E
E
E

26-Mar-14

22-Apr-14

28-Jan-14

3-Feb-14

26-Mar-14

3-Apr-14

24-May-14

4-Jul-14

After LU
After LU
15-Feb-14

24-May-14

E
B

E
B

24-May-14

16-Jul-14

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

51

TRY

Boiler

BTG-HBK-DWG-I-0002

1-95-094-1122 to
1-95-094-11307

FSSS LOGIC DRAWINGS

52

TRY

Boiler

BTG-HLA-DWG-I-0003

2-95-194-03515 to
2-95-194-03522

SADC CONTROL SCHEME AND WRITEUP

53

TRY

Boiler

Err:512

3-97-591-94302

M & C RECOMMENDATIONS-STM & WTR.- BLR

54

TRY

Boiler

BTG-HJF-DSH-M-0035

3-97-291-94300

M & C RECOMMENDATIONS - FUEL OIL SYSTEM

55

TRY

Boiler

BTG-XXX-DWG-M-0036

3-97-291-94299

M & C RECOMMENDATIONS - AIR & FLUE GAS SYSTEM

56

TRY

Boiler

BTG-XXX-DWG-M-0037

0-00-027-46666 to
0-00-027-46668

PPA - GENRAL ARRANGEMENT OF PRESSURE PARTS

57

TRY

Boiler

BTG-QHF-DWG-M-0038

0-00-600-11041

BUNKER TO FEEDER ARRANGEMENT

58

TRY

Boiler

BTG-HFE-DWG-M-0039

0-00-020-7207
0-00-020-7208

LAYOUT OF COLD AIR DUCT

59

TRY

Boiler

BTG-HFE-DWG-M-0040

0-00-020-7209 to
0-00-020-7212

LAYOUT OF HOT AIR DUCT

60

TRY

Boiler

BTG-HNA-DWG-M-0041

0-00-020-7213
0-00-020-7214

LAYOUT OF FG DUCT-ECO TO APH OUTLET

61

TRY

Boiler

BTG-HBK-DSH-M-0042

0-00-020-76406
0-00-020-76407

LOCATION OF FURNACE OPENINGS AND BUCKSTAYS

62

TRY

Boiler

BTG-XXX-DWG-M-0043

0-00-027-46709

PPA - EXPANSION MOVEMENT DIAGRAM

63

TRY

Boiler

BTG-XXX-DSH-M-0044

EXPN MOVMNT DIAG-SEC.PASS AND AIR DUCT HOPPR

64
65
66

TRY
TRY
TRY

Boiler
Boiler
Boiler

BTG-HNE-DSH-M-0424
BTG-HCB-DWG-I-0004
BTG-HFA-DWG-M-0045

CPT-1306
4-97-096-93655
1-00-600-10627

DATA FOR SIZING CHIMNEY


SB ANALOG CONTROL SCHEME
BUNKER EMPTYING ARRANGEMENT

I
I
I

67

TRY

Boiler

BTG-XXX-DSH-M-0046

0-99-100-40259
0-99-100-40260

PA,FD,&ID FAN HANDLING

68

TRY

Boiler

BTG-GMQ-DWG-M-0047

0-99-300-40261

CIRCULATING WATER PUMP HANDLING ARRANGEMENT

69

TRY

Boiler

BTG-XXX-DWG-M-0048

0-99-400-40262
0-99-400-4022

APH/SCAPH HANDLING ARRANGEMENT

70

TRY

Boiler

BTG-XXX-DWG-M-0049

0-99-502-40264

PRESSURE PARTS HANDLING ARRANGEMENT

71

TRY

Boiler

BTG-XXX-DSH-M-0050

0-00-020-7205
0-00-020-7206

TERMINAL POINT DETAILS OF FEED WATER,MS,CRH&HRH


PIPINGS

2-00-047-47586

SAFETY VALVE SETTING FOR SEPEPARATORE, SH,RH AND


SB -OTSC

72

TRY

Boiler

BTG-XXX-DSH-M-0051

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Feb-14

24-Feb-14

30-May-14

15-Feb-14

24-Feb-14

22-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Mar-14

26-Mar-14

24-Apr-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Oct-13

16-Oct-13

8-Jan-14

15-Oct-13

24-Oct-13

8-Jan-14

15-Oct-13

16-Oct-13

8-Jan-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Aug-14

16-Jul-14

10-May-14

24-May-14

21-Jul-14

15-Oct-13
15-Mar-14
15-Mar-14

16-Oct-13
26-Mar-14
26-Mar-14

8-Jan-14
2-Apr-14
3-Apr-14

15-Jul-14

24-May-14

19-Jul-14

24-May-14

19-Jul-14

Remarks
NTP
NTP
NTP
NTP
NTP
NTP
NTP

NTP

NTP

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

15-Jul-14

TRY

Boiler

BTG-HFB-DWG-I-0005

Gravimetric Feeder Control Schematic Diagram & Write-Up

TRY

Boiler

BTG-XXX-DWG-I-012

Furnace temperature Probe Datasheets & Wiring Diagrams

15-Feb-14

15-Feb-14

75

TRY

Boiler

BTG-XXX-DSH-I-0006

TP DETAILS - MEASUREMENT AND CONTROLS

76

TRY

Boiler

BTG-XXX-DWG-I-0007

STLD SYSTEM - INTERCONNECTION DIAGRAM

77

TRY

Boiler

BTG-XXX-DSH-I-0008

LOCATION OF THERMOCOUPLES FOR DRUM, SH & RH


METAL TEMP. MEASUREMENT

NTP
NTP
NTP
NTP

Boiler

BTG-PAC-DWG-M-0052

40-GA-BCWP-001

GA drawing of Boiler Circulating Water Pump

79

TRY

Boiler

BTG-XXX-DWG-I-0164

40-WU-ERV-001

Electromatic Relief Valve (ERV) Control Write -Up &


Interconnection Diagrams

NTP

NTP

NTP

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

5-Mar-14

12-Mar-14

5-Jun-14

F
F
F
B
B
B
B
B
B

16-May-14

4-Jul-14

23-May-14

20-Jun-14

6-Feb-14

19-Feb-14

6-Feb-14

19-Feb-14

6-Feb-14

19-Feb-14

23-May-14

4-Jul-14

28-Jan-14

6-Feb-14

24-May-14

20-Jun-14

23-May-14

18-Jul-14

16-Jul-14

E
A
A
A
A

F
B
E
B

E
E

7-Mar-14

7-Mar-14

24-Feb-14

F
26-Mar-14

10-May-14

24-May-14

21-Jul-14

10-May-14

24-May-14

21-Jul-14

10-May-14

24-May-14

21-Jul-14

7-Dec-13

9-Jan-14

3-Apr-14

16-Jul-14
F

F
F
F

12-Aug-14
15-Dec-13

TRY

R2SUB_A_DT R2APP_A_DT R2APP


CAT

F
B

24-Feb-14

NTP

78

R1SUB_A_DT R1APP_A_DT R1APP


CAT

15-Jul-14

NTP

74

FAPP
CAT

15-Jul-14

NTP

73

0-97-298-90893

COMP_S

2X660 MW IB VALLEY TPS

24-May-14

21-Jul-14

F
15-Jun-15
15-Sep-14

NTP

80

TRY

Boiler

BTG-QL-DWG-M-0053

Layout & GA of Auxiliary boiler

81

TRY

Boiler

BTG-LA-DWG-M-0430

P & ID of steam and feed water system of Auxiliary boiler

82

TRY

Boiler

BTG-QHL-DWG-M-0431

P & ID of air and flue gas system of Auxiliary boiler

83

TRY

Boiler

BTG-HJF-DWG-M-0432

P & ID of fuel oil system of Auxiliary boiler

NTP

84

TRY

Boiler

BTG-QL-SCH-M-0054

Valve schedule of Auxiliary boiler

NTP

85

TRY

ELEVATOR

GA & Machine Room Layout of 2 Tons passenger cum goods


elevator

NTP

86

RPT

MDL

Err:512

MDL:IB VAL:R652-653/00

MASTER DRAWING LIST-RPT

87
88

RPT
RPT

QAP
APH

Err:512
BTG-HLD-DWG-M-0055

IB_VALLEY.BAP_QP
1-55-220-02571/00

Quality Plan
GA of Air Preheater

89

RPT

APH

BTG-HLD-DWG-M-0056

3-52-220-02495/00

GA Notes of Air Preheater

90

RPT

AQCS

BTG-HDE-DWG-M-0057

0-00-111-27437 /00

General arrangement drawing of ESP

91
92

RPT
RPT

AQCS
AQCS

BTG-HDE-CAL-M-0058
BTG-UMC-DWG-S-0005

AQCS:R652:C:SIZ:002
0-00-112-27468

ESP sizing calculation


ESP foundation plan including load details

93

RPT

AQCS

BTG-HDE-DWG-M-0059

3-00-118-37857/00

ESP hopper thermal movement diagram

94
95

RPT
RPT

AQCS
AQCS

BTG-HDE-DSH-M-0060
BTG-HNE-DWG-M-0061

AQCS:R652:C:ACD:001
0-87-100-80382

ESP hopper ash collection data


Chimney GA Drawing for Auxiliary Boiler

96

RPT

AQCS

BTG-UMC-DWG-S-0006

2-87-010-05454

Chimney Foundation Drawing for Auxiliary Boiler

97
98
99

RPT
RPT
RPT

E C&I
E C&I
E C&I

BTG-HNA-DSH-I-0009
BTG-XXX-DWG-E-0002
BTG-XXX-DWG-E-0003

TWP:IBVALLEY P-II /00


2-00-114-29596/00
3-00-114-37489/00 3-00-114-37502/00

Write-up on ESP controllers & IOS


Electrical scope of supply drawing
SLD & scheme for ACP

100

RPT

E C&I

BTG-XXX-DWG-E-0004

2-00-114-29611/ 00 3-00-114-37502/ 00

SLD & scheme for LTMSB

101

RPT

E C&I

BTG-CWQ-DWG-E-0005

2-00-114-29595/00

Recommended layout of ESP control room

102

RPT

E C&I

BTG-CWQ-SCH-E-0006

2-00-114-29597/00

Cable Schedule

103

RPT

E C&I

BTG-BAU-DWG-E-0007

2-00-114-29598/00
2-00-114-29599/00

Earthing scheme

104

RPT

E C&I

BTG-SB-DWG-E-0008

2-00-114-29601/00

Field connection diagram of heating elements

105
106
107
108
109
110

RPT
RPT
RPT
RPT
RPT
RPT

E C&I
E C&I
E C&I
E C&I
E C&I
FANS

BTG-XXX-LIST-E-0009
BTG-HNA-DSH-I-0010
BTG-HLD-DWG-I-0165
BTG-HLD-SCH-I-0011
BTG-HLD-PCD-I-0012
BTG-HLB-DWG-M-0062

Rev 00
2-00-114-29600/00
2-00-114-29656/00
2-00-114-29657/00
2-00-114-29658/00
3-00-102-37416/00

Electrical Load list


Interlocking System for ESP
Scheme of APH with Instruments
Measure & Control schedule for APH
Write Up for APH with Instrument
Performance curve for FD Fan

A
A
I
I
A
A
I
I
I
A
A
I
I
A
A
I
I
I
I
I
I
A
A
A
A

NTP

1 (i)
2 (i)
2 (vii)
2 (vii)
2 (vii)
2 (ii)
3 (v)
2 (iii)
2 (iii)
2 (vii)
3 (v)
2 (vi)
2 (ii)
2 (ii)
2 (ii)
2 (iv)
2 (vi)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (vi)
2 (iv)
2 (vi)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

15-Nov-13

25-Nov-13

8-Jan-14

15-Nov-13

25-Nov-13

8-Jan-14

15-Nov-13

25-Nov-13

8-Jan-14

15-Dec-13

7-Dec-13

8-Jan-14

15-Dec-13

7-Dec-13

27-Jan-14

1-Jan-14

1-Jan-14

15-Feb-14

26-Aug-13

26-Aug-13

24-Sep-13

26-Sep-13
26-Sep-13

25-Sep-13
13-Sep-13

31-Jan-14
5-Dec-13

26-Sep-13

13-Sep-13

5-Dec-13

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13
26-Sep-13

13-Sep-13
25-Sep-13

16-Oct-13
16-Oct-13

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13
26-Sep-13

13-Sep-13
25-Sep-13

31-Dec-13
19-Dec-13

26-Sep-13

25-Sep-13

1-Feb-14

26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13

25-Feb-14
1-Nov-13
16-Oct-13

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13

13-Sep-13

25-Feb-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
25-Sep-13
13-Sep-13

10-Jan-14
10-Jan-14
11-Nov-13
5-Dec-13
11-Nov-13
14-Nov-13

2 OF 276

B
B
B
B
B
B
C
C
C
B
C
C
C

23-May-14

4-Jul-14

23-May-14

4-Jul-14

23-May-14

4-Jul-14

B
B
B

16-Jul-14

16-May-14
23-May-14

4-Jul-14

26-Mar-14

4-Jul-14

10-Oct-13

4-Nov-13

24-Feb-14
16-Dec-13

2-Jun-14
5-Feb-14

16-Dec-13

26-Jan-14

19-Dec-13

16-Apr-14

6-Feb-14
13-Feb-14

1-Mar-14
19-Feb-14

20-Mar-14
5-Mar-14

6-Apr-14

24-Feb-14

21-Mar-14

7-Dec-13
7-Dec-13

10-Jan-14
14-Jan-14

7-Dec-13

10-Jan-14

19-Apr-14

8-Jul-14

15-Feb-14

22-Feb-14

15-Feb-14

22-Feb-14

15-Feb-14

22-Feb-14

7-Dec-13
7-Dec-13
7-Dec-13
24-Dec-13

31-Dec-13
1-Jan-14
31-Dec-13
5-Feb-14

16-Jul-14

A
E
F

19-Jul-14
21-May-14

26-May-14

20-Mar-14
21-Mar-14

28-Mar-14
22-Apr-14

9-Jun-14

21-Jul-14

15-Feb-14
10-Feb-14

22-Feb-14
22-Feb-14

10-Feb-14

22-Feb-14

24-Dec-13

8-Jan-14

20-Mar-14

3-Apr-14

E
A

A
B
C
C
E
C
C
C
C
B
B
B
E
E
B
B
B
C

E
B
B
B

A
A

C
E
E
E

A
C
A
B

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

111

RPT

FANS

BTG-HNC-DWG-M-002

3-00-103-37417/00

Performance curve for ID Fan

112
113
114
115

RPT
RPT
RPT
RPT

FANS
FANS
FANS
FANS

BTG-HFE-DWG-M-0064
BTG-XXX-DWG-M-0065
BTG-HLB-DWG-M-0066
BTG-HNC-DWG-M-0067

3-00-104-37418/00
3-00-106-37419/00
1-00-098-28759/00
1-00-099-28760/00

Performance curve for PA Fan


Performance curve for Seal Air Fan
GA of FD Fan
GA of ID Fan

A
A
I

116
117

RPT
RPT

FANS
FANS

BTG-HFE-DWG-M-0068
BTG-XKW-DWG-M-0069

1-00-100-28761/00
1-00-106-28762/00

GA of PA Fan
GA of Seal Air Fan

118
119

RPT
RPT

FANS
FANS

BTG-HLB-DWG-M-0070
BTG-HLB-PCD-M-0071

1-00-098-29658
2-00-107-29585/00

GA of FD Fan For Auxiliary Boiler


Lube Oil scheme with write up for FD fan

120

RPT

FANS

BTG-HFE-PCD-M-0072

2-00-107-29586/00

Lube Oil scheme with write up for PA fan

121

RPT

FANS

BTG-HNC-PCD-M-0073

2-00-107-29587/00

Lube Oil scheme with write up for ID fan

122
123
124
125

RPT
RPT
RPT
RPT

FANS
FANS
APH
APH

BTG-HLB-DWG-M-0074
BTG-HFE-DWG-M-0075
BTG-XXX-DWG-M-0076
BTG-UMC-DSH-S-0007

2-00-098-29588/00
2-00-100-29589/00

Silencer Arrangement for FD fan


Silencer Arrangement for PA fan
Assembly of SCAPH
Air Receiver location and Foundation loading details

I
I
I
I

126

RPT

AQCS

BTG-HDE-DSH-M-0077

ESP Flow model test procedure

127

RPT

AQCS

BTG-HDE-DSH-M-0078

ESP G.D test procedure

128

RPT

AQCS

BTG-HDE-DSH-M-0079

ESP Performance Guarantee test procedure

129

RPT

Tech Services

Err:512

O & M Manuals

130

RPT

Tech Services

BTG-XXX-DWG-M-0080

Erection Drawings

288

PEM

MDL

289

PEM

BOI

290

PEM

BBU

291
292

PEM
PEM

LAYOUT
POWER
CYCLE

PG

Err:512

PG
PG
ELE

BTG-XXX-DWG-E-0020
BTG-XXX-DSH-I-0166

PE-SC-391-100-P001

MASTER DRAWING LIST-PEM

PE-SC-391-100-P002

PEM BOI PACKAGES EXECUTION MODALITY

PE-SC-391-100-P003

BILLING BREAK UP OF PEM BOI PACKAGES

PE-DC-391-100-E101
PE-DC-391-100-N101

DESIGN PHILOSOPHY FOR ELECTRICAL EQUIPMENT LAYOUT


INTERLOCK & PROTECTION WRITE-UP FOR REGENERATIVE
SYSTEM

MSE

293

PEM

POWER
CYCLE

294

PEM

POWER
CYCLE

295

PEM

POWER
CYCLE

MSE

296

PEM

POWER
CYCLE

MSE

297

PEM

POWER
CYCLE

MSE

298

PEM

POWER
CYCLE

MSE

299

PEM

POWER
CYCLE

MSE

300

PEM

POWER
CYCLE

MSE

301

PEM

CHEM DOSING

MSE
MSE

Err:512

PE-DC-391-100-N102

WRITE-UP FOR CENTRAL LUBE OIL PURIFICATION SYSTEM

BTG-QSV-DSH-M-0093

PE-DC-391-100-N103

WRITE-UP FOR HP BYPASS SYSTEM

BTG-LCR-DSH-M-0094

PE-DC-391-100-N104

WRITE-UP FOR AUXILIARY PRDS SYSTEM

BTG-MAN-DSH-M-0095

PE-DC-391-100-N105

WRITE-UP FOR DM MAKE UP WATER SYSTEM

BTG-LCB-CAL-M-0096

PE-DC-391-100-N111

CEP SIZING CALCULATION

BTG-XXX-CAL-M-0097

PE-DC-391-100-N112

BFP SIZING CALCULATION

BTG-XXX-CAL-M-0101

PE-DC-391-100-N120

SIZING CALCULATION FOR AUXILIARY PRDS

BTG-XXX-CAL-M-0100

PE-DC-391-100-N125

MISCELLANEOUS PUMP SIZING CALCULATION

BTG-LFN-DSH-M-0102

PE-DC-391-154-A001

DESIGN MEMORANDUM OF CHEMICAL DOSING SYSTEM

MAX
302

PEM

O2 DOSING

303

PEM

CPU

304

PEM

MRS

305

PEM

CW/ ACW

306

PEM

CST

307

PEM

DMCW

308

PEM

D/G EOT
CRANE

309

PEM

D/G EOT
CRANE

310

PEM

ELEVATOR

311
312

PEM
PEM

CABLES &
CABLING&
CABLES
CABLING

313

PEM

CABLES &
CABLING

314

PEM

DC SYSTEM

315

PEM

DC SYSTEM

316

PEM

GRNDG &
LTNG PRTN

317

PEM

GRNDG &
LTNG PRTN

318

PEM

PRTN & CTRL

319

PEM

GCB

320

PEM

GCB

321

PEM

LIFTING EQMT

322

PEM

AC

323

PEM

VENTILATION

MAX
MAX
MAX
MSE
MAX
MSE
MAX

ELE
ELE
ELE
ELE

ELE
ELE
ELE

MAX
MAX

A
A
A

LNTP
LNTP
LNTP

2 (vii)
2 (vii)

LNTP

2 (vii)
2 (vi)

LNTP

2 (vi)
2 (vii)
2 (vii)

LNTP

LNTP

LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP

2 (iii)
4 (i)

A
A
A
A
A
A
A
A

LNTP

DESIGN MEMORANDUM OF OXYGEN DOSING SYSTEM


DESIGN MEMORANDUM OF CPU

BTG-XXX-DSH-M-0423

PE-DC-391-160-A001

DESIGN MEMORANDUM OF MRS

BTG-XXX-DSH-M-0104

PE-DC-391-165-N002

CW AND ACW SYSTEM DESGIN PHILOSOPHY & SYSTEM


WRITE-UP

BTG-XXX-DSH-M-0422

PE-DC-391-167-A001

DATASHEET OF MISC TANKS

BTG-XXX-DWG-M-0106

PE-DC-391-179-N002

DMCW SYSTEM DESGIN PHILOSOPHY & SYSTEM WRITE-UP

BTG-SMS-DSH-M-0420

PE-DC-391-501-A001

DESIGN MEMORANDUM FOR D/G EOT CRANE ABOVE 50T

PE-DC-391-501-A002

DESIGN MEMORANDUM FOR D/G EOT CRANE UPTO 50T

BTG-SNM-DSH-S-0009

PE-DC-391-502-A001

DESIGN MEMORANDUM FOR ELEVATOR

BTG-XXX-CAL-E-0023
BTG-XXX-CAL-E-0024

PE-DC-391-507-E001
PE-DC-391-507-E002

DESIGN CALCULATIONS FOR MV CABLES SELECTION &


SIZING CALCULATIONS FOR LV CABLES SELECTION &
DESIGN
SIZING

BTG-XXX-DSH-E-0025

PE-DC-391-507-E004

CABLE ERECTION PHILOSOPHY

BTG-BT-DSH-E-0028

PE-DC-391-508-E001

DESIGN MEMORANDUM FOR 220V DC SYSTEM

PE-DC-391-508-EXXX

O&M MANUAL-DC BATTERY

PE-DC-391-509-E002

DESIGN MEMORANDUM FOR GROUNDING SYSTEM

BTG-BAU-DSH-E-0030

PE-DC-391-509-E003

DESIGN MEMORANDUM FOR LIGHTNING PROTECTION


SYSTEM

BTG-MKY-CAL-E-0034

PE-DC-391-510-E003

CT & VT CALCULATIONS FOR GENERATOR CIRCUIT


METERING & PROTECTION [STG]

BTG-XXX-DSH-M-0116

PE-DC-391-510-E100

TECHNICAL DETAILS OF GCB

PE-DC-391-510-EXXX

O&M MANUAL GCB

BTG-SML-DSH-M-0421

PE-DC-391-524-A001

DESIGN MEMORANDUM FOR S/G CRANE, HOIST & CPB

BTG-SA-DSH-M-0089

PE-DC-391-553-A001

DESIGN PHILOSOPHY FOR AC SYSTEM

BTG-XXX-DSH-M-0090

PE-DC-391-554-A001

DESIGN PHILOSOPHY FOR VENT. SYSTEM

A
A
A
A
A
A
A
A
A
A
A
A
A

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

A
A

26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13

14-Nov-13
14-Nov-13
31-Dec-13
31-Dec-13

C
C
B

26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13

31-Dec-13
31-Dec-13

26-Sep-13
26-Sep-13

25-Sep-13
13-Sep-13

8-Jan-14
14/11/13

26-Sep-13

13-Sep-13

14/11/13

26-Sep-13

13-Sep-13

14/11/13

26-Sep-13
26-Sep-13
3-Jul-14
3-Jul-14

13-Sep-13
13-Sep-13

31-Dec-13
31-Dec-13

27-Aug-13

26-Aug-13

24-Sep-13

26-May-14

9-May-14

26-Jun-14

LNTP

13-Sep-13
20-Sep-13

24-Oct-13
18-Feb-14

27-Sep-13
27-Nov-13

LNTP
LNTP
LNTP

4 (iii)
4 (iv)
4 (i)
4 (iii)

27-Nov-13

20-Sep-13

13-Nov-13

4-Apr-14

16-Apr-14

27-Nov-13

20-Sep-13

11-Dec-13

26-Feb-14

15-Mar-14

27-Nov-13

20-Sep-13

11-Dec-13

27-Nov-13

20-Sep-13

11-Dec-13

27-Nov-13

20-Sep-13

6-Nov-13

27-Nov-13

20-Sep-13

11-Nov-13

27-Nov-13

9-Nov-13

9-Jan-14

27-Nov-13

11-Oct-13

6-Nov-13

27-Nov-13

17-Sep-13

1-Oct-13

LNTP
LNTP
LNTP
LNTP
LNTP

4 (i)
4 (iii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

LNTP
LNTP
16-Jul-14

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

10-Jan-14
10-Jan-14

31-Jan-14
31-Jan-14

LNTP
LNTP

4 (i)
4 (i)
5 (i)

LNTP
LNTP
LNTP
LNTP
NTP

4 (i)
4 (i)
4 (i)

LNTP
LNTP
LNTP

B
B
C
C
C
B
B

5-Feb-14

20-Mar-14

3-Apr-14

24-Dec-13
24-Dec-13
13-Jan-14
13-Jan-14

5-Feb-14
5-Feb-14
5-Feb-14
5-Feb-14

B
B
B

15-Feb-14
15-Feb-14
19-Feb-14
19-Feb-14

26-Feb-14
26-Feb-14

13-Jan-14
13-Jan-14

5-Feb-14

19-Feb-14

13-Jan-14
3-Jan-14

28-Feb-14
27-Jan-14

5-Mar-14

19-Mar-14

3-Jan-14

27-Jan-14

3-Jan-14

27-Jan-14

13-Jan-14
13-Jan-14

5-Feb-14
5-Feb-14

10-Oct-13

4-Nov-13

5-May-14

23-May-14

27-Feb-14

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

4-Apr-14

16-Apr-14

8-Jan-14

15-Jan-14

8-Jan-14

15-Jan-14

24-Feb-14

28-Feb-14

19-Apr-14

9-May-14

21-May-14

28-May-14

7-Apr-14

8-May-14

15-May-14

4-Jun-14

R5SUB_A_DT

A
A
A
E

9-Jun-14

A
A
A
E
E

C
C

5-Jul-14

7-Dec-13
6-Mar-14

26-Jan-14
15-Apr-14

C
C
C
B
C
C
B
C

27-Nov-13

17-Sep-13

1-Oct-13

27-Nov-13

9-Nov-13

19-Dec-13

27-Nov-13

17-Sep-13

24-Oct-13

27-Nov-13

19-Sep-13

18-Dec-13

27-Nov-13

12-Nov-13

7-Dec-13

27-Nov-13

19-Sep-13

18-Dec-13

27-Nov-13

19-Sep-13

11-Nov-13

27-Nov-13

19-Sep-13

11-Nov-13

27-Nov-13

17-Sep-13

24-Oct-13

27-Nov-13
27-Nov-13

13-Sep-13
13-Sep-13

25-Oct-13
25-Oct-13

27-Nov-13

13-Sep-13

11-Dec-13

27-Nov-13

21-Nov-13

20-Dec-13

27-Nov-13

13-Sep-13

24-Oct-13

27-Nov-13

13-Sep-13

24-Oct-13

27-Nov-13

13-Sep-13

6-Nov-13

27-Dec-13

21-Nov-13

20-Jan-14

27-Nov-13

23-Nov-13

18-Dec-13

27-Nov-13

25-Sep-13

24-Oct-13

27-Nov-13

25-Sep-13

24-Oct-13

C
C
C
B
C
B
C
C
C
C
C

A
B

24-Dec-13

10-Feb-14

24-Dec-13

10-Feb-14

24-Dec-13

10-Feb-14

24-Dec-13

10-Feb-14

21-Dec-13

26-Jan-14

7-Dec-13

18-Feb-14

15-Jan-14

13-Feb-14

27-Dec-13

12-Feb-14

31-Oct-13

6-Nov-13

A
B

28-Feb-14

15-Mar-14

26-Feb-14

15-Mar-14

13-Feb-14

13-Mar-14

6-Mar-14

6-Apr-14

7-Dec-13

24-Dec-13

B
B
B

6-Nov-13

4-Jan-14

27-Jan-14

20-Jan-14

13-Feb-14

24-Dec-13

15-Jan-14

27-Dec-13

9-Jan-14

10-Jan-14

31-Mar-14

7-Dec-13

31-Dec-13

7-Dec-13

31-Dec-13

9-Nov-13

18-Dec-13

12-Nov-13
11-Nov-13

24-Dec-13
24-Dec-13

8-Jan-14

6-Feb-14

11-Nov-13

11-Dec-13

9-Nov-13

11-Dec-13

7-Dec-13

28-Mar-14

31-Jan-14

13-Feb-14

6-Mar-14

20-Mar-14

7-Dec-13

15-Jan-14

21-Dec-13

9-Jan-14

B
A
A

A
A
B

31-Oct-13

B
C

B
7-Dec-13

24-Dec-13

18-Feb-14

21-Feb-14

22-Jan-14

31-Jan-14

4-Apr-14

24-May-14

1-Feb-14

7-Mar-14

1-Feb-14

7-Mar-14

28-Feb-14
26-Feb-14

10-Mar-14
10-Mar-14

12-Feb-14

13-Feb-14

4-Jan-14

6-Feb-14

3-Feb-14

11-Mar-14

6-Mar-14

28-Mar-14

7-Mar-14

28-Mar-14

B
C

A
B
B
B
B
B

A
A
A
A

A
C
C

A
A

E
C

26-Apr-16

NTP
4 (i)

24-Dec-13

LNTP

LNTP

LNTP

I
A

14-Nov-13

LNTP

I
A

13-Sep-13

R2SUB_A_DT R2APP_A_DT R2APP


CAT

26-Jul-14

4 (iii)

PE-DC-391-155-A001

26-Sep-13

R1SUB_A_DT R1APP_A_DT R1APP


CAT

1 Month before
Supply of items

1 Month
before Supply
of items

NTP

FAPP
CAT

26-Jul-17

40th Month
from NTP

FAPP_A_DT

28-Mar-16

24th Month
from NTP

NTP

FSUB_A_DT

27-Mar-16

24th Month
from NTP

1 (i)

2X660 MW IB VALLEY TPS

FSUB_S_DT

26-Mar-16

24th Month
from NTP

PE-DC-391-154-A501

BTG-BAU-DSH-E-0029

LNTP

2 (vi)
2 (vi)
2 (vii)
2 (vii)

2 (vi)

COMP_A

Remarks

BTG-LDU-DSH-M-0114

ELE
MAX

BTG-LFN-DSH-M-0103

ELE
ELE

2 (vi)

MAX
MAX

COMP_S

21-May-14
16-Jul-14

29-May-14

C
C
C
B

A
C
B

26-Jun-16

3 OF 276

C
C
C

A
C
C

C
C

5-Jun-14

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
324

PEM

COMPRESSED
AIR

325

PEM

COMPRESSED
AIR

MAX

326

PEM

COMPRESSED
AIR

MAX

327
328
329
330

PEM
PEM
PEM
PEM

LTG SYSTEM
LTG SYSTEM
DG SYSTEM
AUX SYSTEM

331

PEM

AUX SYSTEM

332

PEM

GENERAL

333

PEM

LAYOUT

334
335
336

PEM
PEM
PEM

LAYOUT
LAYOUT
LAYOUT

337

PEM

LAYOUT

338

PEM

LAYOUT

339

PEM

GENERAL

340

PEM

LAYOUT

MAX

ELE
ELE
ELE
ELE
ELE
CIV
ELE
ELE
ELE
ELE
ELE
ELE
CIV

LNTP
Purpose reference
(I/ A)

BTG-SCA-DSH-M-0091

PE-DC-391-555-A001

DESIGN MEMORANDUM OF COMPRESSED AIR SYSTEM

BTG-XXX-DWG-E-0040

PE-DC-391-555-A002

IA DISTRIBUTION SCHEME

BTG-XXX-DWG-E-0041

PE-DC-391-555-A003

SA DISTRIBUTION SCHEME

BTG-XXX-DSH-E-0035
BTG-BD-CAL-E-0036
BTG-BCA-CAL-E-0011

PE-DC-391-558-E001
PE-DC-391-558-EXXX
PE-DC-391-561-E001
PE-DC-391-565-E002

DESIGN MEMORANDUM FOR LIGHTING SYSTEM


O&M MANUAL LIGHTING SYSTEM
DESIGN CALCULATIONS FOR EMERGENCY SUPPLY DG
SIZING
DESIGN CALCULATIONS FOR GENERATOR AND MV SYSTEMS

BTG-XXX-DSH-E-0037

PE-DC-391-565-E003

BASIC TECHNICAL FEATURES FOR HT/LT MOTORS


(FOR BHEL-PEM SCOPE PACKAGES)

BTG-XXX-DSH-S-0010

PE-DC-391-600-C001

DESIGN CRITERION FOR STRUCTURAL WORKS

BTG-XXX-DWG-E-0021

PE-DG-391-100-E001

LAYOUT OF TRANSFORMER YARD

BTG-BCA-DWG-E-0038
BTG-BHA-DWG-E-0039
BTG-XXX-DWG-E-0506

PE-DG-391-100-E002
PE-DG-391-100-E003
PE-DG-391-100-E006

LAYOUT OF MV SWITCHGEAR ROOM


LAYOUT OF LV SWITCHGEAR ROOM
LAYOUT OF BOILER SWITCHGEAR ROOM

BTG-XXX-DWG-E-0043

PE-DG-391-100-E008

ELECTRICAL EQUIPMENT & CABLING LAYOUT IN ESP


CONTROL ROOM BUILDING

BTG-XXX-DWG-E-0047

PE-DG-391-100-E040

CABLING LAYOUT FOR UNITISED CONTROL EQUIPMENT


ROOM

BTG-XXX-DSH-S-0011

PE-DG-391-600-C002

GENERAL NOTES FOR STRUCTURAL STEEL WORKS.

BTG-XXX-DWG-E-0048

PE-DG-391-100-E041

CABLING LAYOUT FOR CENTRAL CONTROL ROOM

A
A
A
A
I
A
A
A
A
A
A
I
I
I

ELE
341

PEM

LAYOUT

343

344

PEM

BTG-XXX-DBR-M-0433

PEM

PEM

PIPING
LAYOUT

MPL

PIPING
LAYOUT

MPL

PIPING
LAYOUT

MPL
MPL

346

PEM

PIPING
LAYOUT

MPL

347

PEM

PIPING
LAYOUT

348

PEM

PEDG391100M001

DESIGN BASIS DOCUMENT FOR EQUIPMENT LAYOUT

PEDG391100M002

MAIN EQUIPMENT LAYOUT PLAN

PEM

LAYOUT

350

PEM

SUMP PUMPS

PEDG391100M003

TG EQUIPMENT LAYOUT DRAWING AT 0.0M

PEDG391100M004

TG EQUIPMENT LAYOUT DRAWING AT 8.5 M

BTG-XXX-DWG-M-0084

PEDG391100M005

TG EQUIPMENT PLAN AT 17.0M

BTG-XXX-DWG-M-0085

PEDG391100M006

TG EQUIPMENT PLAN AT DEAERATOR FLOOR

BTG-XXX-DWG-M-0086

PEDG391100M007

CROSS SECTION OF MAIN PLANT

352

PEM

MSE

POWER
CYCLE

MSE
MSE

353

PEM

POWER
CYCLE

354

PEM

POWER
CYCLE

PEDG391100M030

PEDG391100M051

PIPE RACK LAYOUT IN BTG ISLAND

BTG-XXX-DSH-M-0113

PE-DG-391-100-N001

DESGIN PHILOSOPHY & WRITE-UP-SUMP PUMP

A
A

355

PEM

POWER
CYCLE

PEM

POWER
CYCLE

357

PEM

POWER
CYCLE

MSE

358

PEM

POWER
CYCLE

MSE

359

PEM

POWER
CYCLE

360

PEM

POWER
CYCLE

MSE

361

PEM

POWER
CYCLE

MSE

362

PEM

POWER
CYCLE

363

PEM

HBD

PEM

C&I

365

PEM

C&I

366

PEM

C&I

367
368
369
370

PEM
PEM
PEM
PEM

C&I
C&I
C&I
C&I

371

PEM

C&I

372

PEM

C&I

373

PEM

C&I

374

PEM

C&I

375
376

PEM
PEM

C&I
C&I

P & ID - HP/ LP BYPASS SYSTEM

PE-DG-391-100-N103

P & ID - EXTRACTION STEAM SYSTEM FOR HEATERS

BTG-LCJ-DWG-M-0437

PE-DG-391-100-N104

P & ID - HEATER DRAINS & VENTS SYSTEM

MSE

MSE

MSE
MSE
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I

PE-DG-391-100-N105

P & ID - FEED WATER SYSTEM

BTG-LC-DWG-M-0439

PE-DG-391-100-N106

P & ID - CONDENSATE SYSTEM

BTG-LBG-DWG-M-0440

PE-DG-391-100-N107

P & ID - AUXILIARY STEAM SYSTEM

BTG-XXX-DWG-M-0441

PE-DG-391-100-N108

P & ID - CENTRAL LUBE OIL STORAGE AND TRANSFER


SYSTEM

BTG-LCR-DWG-M-0442

PE-DG-391-100-N110

P & ID - DM MAKE UP WATER SYSTEM

BTG-LCM-DWG-M-0443

PE-DG-391-100-N111

P & ID - STEAM DRAIN SYSTEM

BTG-LBS-DWG-M-0444

PE-DG-391-100-N112

P & ID - EXTRACTION STEAM FOR BFP TURBINE

BTG-XXX-DWG-M-0088

PE-DG-391-100-N150

HEAT BALANCE DIAGRAM

PE-DG-391-145-I003

CABLE BLOCK DIAGRAM(Station C&I)

BTG-KKS-DWG-I-0017

PE-DG-391-145-I004

UPS SCHEME

LNTP
LNTP
LNTP
LNTP
NTPLNTP

A
A
A
A
A
A
A

27-Nov-13

19-Sep-13

7-Nov-13

27-Nov-13
26-Jun-16
27-Nov-13
27-Sep-13

21-Nov-13

20-Dec-13

13-Sep-13
4-Sep-13

24-Oct-13
19-Nov-13

27-Nov-13

13-Sep-13

24-Oct-13

27-Nov-13

21-Nov-13

18-Dec-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Nov-13
27-Nov-13
27-Nov-13

21-Nov-13
13-Sep-13
13-Sep-13

20-Jan-14
20-Jan-14
20-Jan-14

27-Dec-13

21-Nov-13

16-Apr-14

27-Nov-13

21-Nov-13

9-Jan-14

27-Nov-14

5-Jun-14

4-Jul-14

27-Nov-13

21-Nov-13

9-Jan-14

2 (iv)
2 (iv)

4-Jul-14

27-Sep-13

4-Jul-14

27-Sep-13

4-Sep-13

12-Jun-14

4-Jul-14

27-Sep-13

7-Aug-13

4-Sep-13

12-Jun-14

4-Jul-14

27-Sep-13

7-Aug-13

4-Sep-13

2 (vi)
2 (vi)
2 (vi)
3 (ii)

27-Jan-14

24-Jan-14

27-Feb-14

27-Nov-13

25-Sep-13

20-Dec-13

13-Sep-13

20-Jan-14
29-Apr-14

6-Mar-14
30-May-14

19-Mar-14
4-Jul-14

11-Nov-13

11-Dec-13

24-Dec-13

26-Jan-14

24-Dec-13

18-Feb-14

28-Feb-14

20-Mar-14

16-Sep-13

20-Jan-14

12-Feb-14

10-Mar-14

13-Feb-14
31-Jan-14
31-Jan-14

13-Mar-14
19-Feb-14
19-Feb-14

26-Apr-14

9-May-14

30-May-14

8-Jul-14

20-May-14

29-May-14

20-May-14

29-May-14

10-Jan-14

16-Jan-14

C
C
C
C
C
C
C
F
F

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

26-Apr-14

15-May-14

30-May-14

6-Mar-14

22-Mar-14

6-Mar-14

22-Mar-14

6-Mar-14

22-Mar-14

6-Mar-14

22-Mar-14

6-Mar-14

22-Mar-14

6-Mar-14

22-Mar-14

18-Jun-14

21-Jul-14

18-Jun-14

22-Jul-14

19-Apr-14

24-Apr-14

19-Apr-14

24-Apr-14

19-Apr-14

24-Apr-14

19-Apr-14

24-Apr-14

16-Dec-13

24-Dec-13

R5SUB_A_DT

A
A

C
C
B
C

A
A
C
A
A
C

C
B
B
F

E
E
15-Mar-14

22-Mar-14
A

17-Sep-13

26-Sep-13
C

11-Sep-13

12-Sep-13

C
C

C
27-Dec-13

9-Jan-14

C
11-Sep-13

12-Sep-13

B
27-Dec-13

9-Jan-14

C
11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

C
C

B
27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

C
16-May-14

B
B
B

21-Jul-14
B

26-Feb-14

15-Mar-14

27-Sep-13

13-Sep-13

16-Nov-13

10-Jun-14

27-Sep-13

13-Sep-13

27-Nov-13

5-May-14

10-Jun-14

27-Sep-13

13-Sep-13

27-Nov-13

LNTP
LNTP
LNTP
LNTP
LNTP
NTPLNTP
NTPLNTP

13-Sep-13

11-Nov-13

27-Sep-13

13-Sep-13

11-Nov-13

18-Feb-14

27-Sep-13

13-Sep-13

16-Nov-13

27-Sep-13

13-Sep-13

13-Nov-13

27-Sep-13

13-Sep-13

6-Nov-13

27-Sep-13

13-Sep-13

11/27/2013

27-Sep-13

13-Sep-13

11/27/2013

27-Oct-13

7-Sep-13

1-Oct-13

30-Jul-14

20-May-14

21-Jul-14

9-Nov-13

9-Nov-13

30-Nov-13

18-Nov-13

9-Nov-13

27-Nov-13

4-Jan-14
8-Nov-14
19-Nov-13
19-Nov-13

4-Jan-14

15-Jan-14

19-Nov-13
19-Nov-13

31-Dec-13
31-Dec-13

28-Feb-14

28-Feb-14

4-Apr-14

4-Apr-14
9-Apr-14

NTP

NTP

BTG-HFE-DWG-I-0021

PE-DG-391-145-I206

SEQ.CONTROL SCHEME FOR PA FANS

BTG-HLD-DWG-I-0022

PE-DG-391-145-I207

SEQ. CONTROL SCHEME FOR AIR HEATER

BTG-LCB-DWG-I-0023

PE-DG-391-145-I210

SEQ. CONTROL SCHEME FOR CEP

NTP

9-Apr-14

NTP

14-Jan-15

22-Apr-14

18-Jul-14

28-Feb-14
28-Feb-14

4 OF 276

28-Feb-14
28-Feb-14

26-Feb-14

21-Dec-13

10-Feb-14

27-Dec-13

18-Feb-14

21-Dec-13

18-Feb-14

18-Feb-14

21-Dec-13

10-Feb-14

21-Dec-13

10-Feb-14

27-Dec-13

11-Feb-14

21-Dec-13

18-Feb-14

21-Dec-13

18-Feb-14

11-Oct-13

24-Oct-13

15-Jan-14

26-Jan-14

21-Dec-13

3-Jan-14

20-Mar-14

22-Mar-14

28-Feb-14
28-Feb-14

4-Jul-14
4-Jul-14

C
C
C
C
C

B
B
B
B
B
B
B
B

B
C
C

26-Feb-14

10-Apr-14

7-Mar-14

10-Apr-14

C
18-Feb-14

21-Dec-13

10-Apr-14

21-Dec-13

11-Feb-14

C
27-Sep-13

22-Mar-14

A
21-Dec-13

20-Mar-14
B

27-Dec-13

16-Nov-13

10-Apr-14

NTP

I
I

10-Mar-14

11-Nov-13
16-Dec-13

12-Nov-13

5-May-14

I
I

13-Sep-13

26-Feb-14

LNTP

SEQ. CONTROL SCHEME FOR LP HEATER - 1


SEQ. CONTROL SCHEME FOR LP HEATER - 2

28-Feb-14

SWAS SCHEME
ALARM SCHEDULE
SEQ. CONTROL SCHEME FOR ID FANS
SEQ. CONTROL SCHEME FOR FD FANS

SEQ. CONTROL SCHEME FOR HP HEATER

LNTP

NTP

10-Feb-14

27-Sep-13

NTP

9-Jan-14

R3SUB_A_DT

27-Sep-13

NTP

15-Feb-14

LNTP

2 (vi)

9-Jan-14

PE-DG-391-145-I110
PE-DG-391-145-I202
PE-DG-391-145-I204
PE-DG-391-145-I205

PE-DG-391-145-I212
PE-DG-391-145-I213

10-Jan-14

LNTP

2 (vi)

7-Dec-13

LNTP

2 (vi)

9-Jan-14

4-Sep-13

7-Aug-13

BTG-QUL-DWG-I-0018
BTG-XXX-SCH-M-0133
BTG-HNC-DWG-I-0019
BTG-HLB-DWG-I-0020

PE-DG-391-145-I211

7-Aug-13

LNTP

2 (vi)

7-Dec-13

4-Sep-13

27-Sep-13

INSTRUMENT STUB DETAILS (PRESSURE / TEMPERATURE


STUB)

BTG-LCA-DWG-I-0025
BTG-LCA-DWG-I-0026

7-Aug-13

LNTP

LNTP

13-Feb-14

4-Sep-13

4-Jul-14

PE-DG-391-145-I101

BTG-LAB-DWG-I-0024

7-Aug-13

12-Jun-14

27-Jan-14

LNTP

24-Jan-14

18-Feb-14

LNTP

2 (vi)

9-Jan-14

BTG-XXX-DWG-I-0049

21-Sep-13

LNTP

2 (vi)

19-Nov-13

C
12-Jun-14

LNTP

R2SUB_A_DT R2APP_A_DT R2APP


CAT

C
12-Jun-14

LNTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

A
A

7-Nov-13

27-Sep-13

2 (vi)

19-Sep-13

27-Sep-13

2 (vi)

27-Nov-13

FAPP
CAT

2 (vi)

I
BTG-XXX-DWG-I-0016

LNTP

4 (iii)

7-Nov-13

LNTP

A
BTG-LA-DWG-M-0438

LNTP

6 (i)

MSE

356

364

PE-DG-391-100-N102

BTG-LBQ-DWG-M-0436

17-Sep-13

LNTP

A
BTG-XXX-DWG-M-0435

LNTP

6 (i)

P & ID - MS, HRH, CRH

27-Nov-13

LNTP

A
PE-DG-391-100-N101

FAPP_A_DT

LNTP

BTG-XXX-DWG-M-0434

LNTP
NTP
LNTP

2 (iv)

LEGEND

FSUB_A_DT

LNTP

PE-DG-391-100-N100

LNTP

2 (iv)

COMPOSITE CRITICAL PIPING LAYOUT

BTG-UMY-DWG-M-0118

LNTP

LNTP

BTG-XXX-DWG-M-0087

MSE

5 (ii)

A
BTG-XXX-DWG-M-0117

POWER
CYCLE

4 (ii)
4 (ii)
4 (ii)

MSE
PEM

2 (iv)

LNTP

2 (iv)

MPL

351

4 (i)

2X660 MW IB VALLEY TPS

FSUB_S_DT

Remarks

2 (iv)

MPL
349

4 (i)

COMP_A

2 (iii)

MPL

LAYOUT

4 (i)
2 (ii)

A
BTG-XXX-DWG-M-0083

PIPING
LAYOUT

4 (i)

A
BTG-XXX-DWG-M-0082

PEM

4 (iii)

I
BTG-XXX-DWG-M-0081

345

4 (iii)

MPL
342

4 (i)

COMP_S

A
A

C
26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

26-Feb-14

10-Apr-14

31-Oct-13

6-Dec-13

B
B

26-May-14

10-Jun-14

24-Jan-14

28-Feb-14

A
B
C
A
A
C

7-Mar-14

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
377

PEM

C&I

378
379
380

PEM
PEM
PEM

C&I
C&I
C&I

381

PEM

C&I

C&I
C&I
C&I
C&I
C&I

382
383

PEM
PEM

C&I
C&I

C&I

384
385

PEM
PEM

C&I
C&I

C&I

C&I

PEM

C&I

NTP

COMP_S

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks
NTP
NTP

BTG-LCA-DWG-I-0027

PE-DG-391-145-I214

SEQ. CONTROL SCHEME FOR LP HEATER - 3&4

BTG-LAC-DWG-I-0028
BTG-LCR-DWG-I-0029
BTG-XXX-DWG-I-0030

PE-DG-391-145-I215
PE-DG-391-145-I216
PE-DG-391-145-I218

SEQ. CONTROL SCHEME FOR MDBFP


SEQ. CONTROL SCHEME FOR DM MAKEUP PUMPS
SEQ. CONTROL SCHEME FOR TG ECW PUMPS

I
I
I

NTP

BTG-XXX-DWG-I-0031

PE-DG-391-145-I219

SEQ. CONTROL SCHEME FOR BOILER ECW PUMP

4-Apr-14

4-Apr-14

26-May-14

NTP

18-Mar-15
28-Jan-15
31-Dec-14

NTP

17-Dec-14

27-Jun-14

8-Apr-15
21-Oct-14

5-Jul-14

NTP

NTP

FAPP
CAT

21-Jul-14

30-May-14

21-Jul-14

10-Jun-14

21-Jul-14

17-Sep-13

1-Oct-13

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

7-Apr-14
16-Jul-14

2-May-14

16-Jul-14

3-Jun-14

18-Jul-14

3-Jun-14

12-Jun-14

3-Jun-14

12-Jun-14

3-Jun-14

12-Jun-14

27-Jun-14

8-Jul-14

3-Jun-14

12-Jun-14

13-Jun-14

21-Jul-14

NTP
BTG-HAG-DWG-I-0032
BTG-HAJ-DWG-I-0051

PE-DG-391-145-I220
PE-DG-391-145-I221

SEQ. CONTROL SCHEME FOR BOILER CIRC. WATER PUMP


RE-HEATER PROTECTION LOGICS

BTG-PCB-DWG-I-0033
BTG-XXX-DWG-I-0034

PE-DG-391-145-I222
PE-DG-391-145-I223

SEQ. CONTROL SCHEME FOR ACWP


BINARY DRIVE CONTROL SCHEME FOR MICS. DRIVE(Station
C&I)

I
I

NTP

3-Dec-14
22-Apr-15

BTG-XXX-DWG-I-0036

PE-DG-391-145-I302

ANALOG CONTROL SCHEME

NTP

21-Jan-15

BTG-XXX-DWG-I-0037

PE-DG-391-145-I303

HP BYPASS CONTROL SCHEME

C&I
386

LNTP
Purpose reference
(I/ A)

I
I

C&I
387

PEM

C&I

NTP

C&I
388

PEM

C&I

389

PEM

C&I

390

PEM

LAYOUT

C&I

29-Oct-14

NTP
BTG-XXX-DWG-I-0038

PE-DG-391-145-I304

AUX. PRDS CONTROL SCHEME

10-Dec-14

BTG-XXX-DWG-I-0039

PE-DG-391-145-I350

CO-ORDINATED MASTER CONTROL SCHEME

15-Apr-15

BTG-XXX-DWG-E-0022

PE-DG-391-145-I401

CCR/EER/COMPUTER ROOM LAYOUT

C&I
2 (v)

C&I
391

PEM

C&I

392

PEM

C&I

393

PEM

C&I

394

PEM

C&I

395

PEM

AUX PRDS

396

PEM

AUX PRDS

397

PEM

COLTCS

398

PEM

COLTCS

399

PEM

COLTCS

400

PEM

COLTCS

401

PEM

PHE

402

PEM

PHE

403

PEM

PHE

404

PEM

PHE

405

PEM

MISC.PUMPS

406

PEM

MISC.PUMPS

407

PEM

MISC.PUMPS

408

PEM

C&I

409
410
411
412
413

PEM
PEM
PEM
PEM
PEM

C&I
CW/ ACW
CW/ ACW
C&I
INSULATION

414

PEM

SW/PW

415

PEM

SW/PW

416

PEM

DMCW

417
418

PEM
PEM

ACW/ DMCW
DMCW

419

PEM

MV SYSTEM

420

PEM

MV SYSTEM

421

PEM

MV SYSTEM

422

PEM

MV SYSTEM

423

PEM

MV SYSTEM

424

PEM

MV SYSTEM

425

PEM

MV SYSTEM

426

PEM

LV SWGR

427

PEM

CABLES &
CABLING

ELE

428

PEM

CABLES &
CABLING

ELE

429

PEM

FIRE SEALING

430
431
432
433

PEM
PEM
PEM
PEM

C&I
C&I
GRNDG &
LTNG PRTN
GRNDG
&
LTNG PRTN

434

PEM

GRNDG &
LTNG PRTN

ELE

435
436
437

PEM
PEM
PEM

GRNDG &
LTNG
PRTN PRTN
& CTRL
PRTN & CTRL

ELE
ELE
ELE

C&I
C&I
C&I
C&I
MSE

A
BTG-XXX-DWG-I-0169

PE-DG-391-145-I402

CCR/EER/COMPUTER ROOM FLOOR CUTOUT

BTG-XXX-DWG-I-0170

PE-DG-391-145-I403

SWAS ROOM LAYOUT

BTG-XXX-DWG-I-0171

PE-DG-391-145-I404

SWAS ROOM FLOOR CUTOUT

BTG-XXX-DWG-I-0172

PE-DG-391-145-I405

UPS ROOM LAYOUT

BTG-XXX-DWG-M-0119

PE-V1-391-142-N102

DATA SHEETS OF APRDS

PE-V1-391-142-NXXX

O&M MANUAL FOR APRDS

BTG-XXX-DWG-M-0121

PE-V2-391-165-N001

P&ID OF COLTCS SYSTEM

BTG-XXX-CAL-M-0122

PE-V2-391-165-N002

TECHNICAL DATA SHEET-COLTCS

Err:512

PE-V2-391-165-N003

INSTALLATION PLAN- COLTCS

BTG-XXX-QAD-M-0126

PE-V2-391-165-N009

O& M MANUAL -COLTCS

BTG-PAH-DSH-M-0449

PE-V5-391-179-N001

TDS -PHE

BTG-PAH-MNL-M-0450

PE-V5-391-179-N002

GENERAL ARRANGEMENT OF PHE

BTG-KKS-DWG-I-0013

PE-V5-391-179-N003

SIZING CALCULATION OF PHE's

BTG-XXX-DWG-E-0057

PE-V5-391-179-N006

O&M MANUAL-PHE

BTG-KKS-DWG-I-0014

PE-V6-391-179-N001

TDS AND PERFORMACE CURVES- MISC. PUMPS

BTG-XXX-DWG-E-0058

PE-V6-391-179-N002

GENERAL ARRANGEMENT AND CROSS SECTIONAL-PUMPS

BTG-XXX-DWG-M-0130

PE-V6-391-179-N007

O& M MANUAL -HOR. PUMPS

BTG-XXX-DWG-I-0173

PE-DG-391-145-I406

UPS ROOM FLOOR CUTOUT

BTG-XXX-DWG-E-0062
BTG-XXX-DWG-M-0105
BTG-XXX-SCH-M-0112
BTG-XXX-SCH-M-0134
BTG-XXX-DSH-M-0115

PE-DG-391-145-I407
PE-DG-391-165-N001
PE-DG-391-165-N005
PE-DG-391-145-I203
PEDG391169M031

UNIT CONTROL PANEL LAYOUT


CW AND ACW SYSTEM P&ID
VALVE SCHEDULE - CW/ ACW
S.O.E SCHEDULE
DESIGN MEMO FOR THERMAL INSULATION OF PIPING AND
EQUIPMENTS

BTG-XXX-DWG-M-0109

PE-DG-391-172-N003

SW AND PW DISTN. P&ID

BTG-XXX-SCH-M-0110

PE-DG-391-172-N008

VALVE SCHEDULE OF SW AND PW DISTN SYSTEM

BTG-PGC-DWG-M-0107

PE-DG-391-179-N001

DMCW SYSTEM P&ID

BTG-XXX-CAL-M-0111
BTG-PGC-SCH-M-0108

PE-DG-391-179-N003
PE-DG-391-179-N004

ACW/ DMCW EQUIPMENT SIZING CALCULATIONS


VALVE SCHEDULE- DMCW SYSTEM

BTG-BCA-DWG-E-0012

PE-DG-391-505-E001

SLD FOR 11kV UNIT SWITCHBOARD

BTG-BCA-DWG-E-0013

PE-DG-391-505-E003

LOGIC DIAGRAM FOR 11KV SWITCHGEAR

BTG-BCA-DWG-E-0014

PE-DG-391-505-E004

LOGIC DIAGRAM FOR 3.3KV SWITCHGEAR

BTG-BCA-DWG-E-0015

PE-DG-391-505-E005

LOGIC DIAGRAM FOR BTS PANEL

BTG-BCA-CAL-E-0016

PE-DG-391-505-E006

CT/VT SIZING CALCULATIONS FOR MV SWITCHBOARDS

BTG-BCA-DWG-E-0017

PE-DG-391-505-E041

SLD FOR 3.3kV UNIT AUXILIARY SWITCHBOARD

BTG-BCA-DWG-E-0018

PE-DG-391-505-E051

SLD FOR 3.3kV STATION AUXILIARY SWITCHBOARD

BTG-BHA-DWG-E-0505

PE-DG-391-506-E004

CONTROL LOGIC FOR 415V PCC/ MCC INCOMER, BUS


COUPLER & OUTGOING FEEDERS

BTG-XXX-DSH-E-0026

PE-DG-391-507-E005

TYPICAL DETAILS OF CABLE TRAYS AND ACCESSORIES

BTG-XXX-DSH-E-0027

PE-DG-391-507-E006

INSTALLATION DETAILS FOR CABLE TRAY SUPPORT SYSTEM

BTG-SG-DSH-M-0092

PE-DG-391-507-E007

DESIGN MEMORANDUM FOR FIRE SEALING SYSTEM

BTG-KKS-DWG-I-0035
BTG-XXX-DWG-E-002
BTG-BAU-DSH-E-0031
BTG-BAU-DSH-E-0032

PE-DG-391-145-I273
PE-DG-391-145-I274
PE-DG-391-509-E004
PE-DG-391-509-E005

CONTROL SCHEME FOR LP DOSING PUMPS


CONTROL SCHEME FOR OXYGEN DOSING
TYPICAL ABOVE GROUND EARTHING DETAILS
TYPICAL BELOW GROUND EARTHING DETAILS

BTG-BAU-DSH-E-0033

PE-DG-391-509-E006

TYPICAL LIGHTNING PROTECTION DETAILS

BTG-BAU-DWG-E-0044
BTG-MKY-DWG-E-0019
BTG-MKY-DWG-E-0042

PE-DG-391-509-E032
PE-DG-391-510-E001
PE-DG-391-510-E002

LIGHTNING PROTECTION ARRANGEMENT FOR MAIN PH


BUILDING
SLD FOR GENERATOR CIRCUIT METERING & PROTECTION
[STG]
LOGIC DIAGRAM FOR GENERATOR CIRCUIT PROTECTION &
ANNUNCIATION [STG]

MSE
MSE
MSE
MSE
MSE
MSE
MSE
MSE
MSE
MSE
MSE
MSE
C&I
C&I
MSE
MSE
C&I
MPL
MSE
MSE
MSE
MSE
MSE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

ELE
C&I
C&I
ELE
ELE

NTP

27-Sep-13

LNTP
NTP

15-Jan-14
B

25-Mar-15

NTP
A

21-Dec-13
C

22-Apr-14

NTP

22-Apr-14

22-Apr-14

19-Sep-13
25-Sep-13

16-Nov-13
1-Nov-13

7-Dec-13

5-Feb-14

22-Apr-14

18-Jul-14

24-Dec-13
11-Oct-13

31-Jan-14
31-Jan-14

7-Oct-15
11-Feb-15
NTP

1-Nov-14
26-May-16

NTP
NTP

27-Dec-14

NTP

27-Dec-14

NTP

10-Jan-15

NTP

16-May-15

NTP

27-Dec-14

NTP

27-Dec-14

NTP

27-Dec-14

NTP

16-May-15

NTP

2-Jan-15

NTP NTP

2-Jan-15

NTP NTP

2-Jan-15

20-May-15
NTP
A
A
I

4 (iii)
4 (iii)

LNTP
LNTP

24-Feb-14
17-Apr-14

15-Mar-14
2-May-14

I
A
A
I
A
I
I
A
A
A
A
I
A
A
A
A
I
I

5 (i)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
4 (i)
4 (i)
4 (i)

LNTP
LNTP
LNTP
LNTP

28-Feb-14

16-Mar-14

27-Nov-13

31-Oct-13

20-Dec-13

19-Apr-14

9-May-14

27-Nov-13

31-Oct-13

20-Dec-13

24-Feb-14

15-Mar-14

27-Nov-13

19-Sep-13

16-Nov-13

27-Nov-13
27-Nov-13

23-Nov-13
25-Sep-13

24-Dec-13
1-Nov-13

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

17-Apr-14
27-Jun-14

8-Jul-14

27-Sep-13

13-Sep-13

25-Oct-13

27-Jun-14

21-Jul-14

27-Sep-13

13-Sep-13

25-Oct-13

12-Mar-14

4-May-14

27-Sep-13

13-Sep-13

25-Oct-13

28-Feb-14

15-Mar-14

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

6-Nov-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

4-Nov-13

27-Nov-13

13-Sep-13

11-Mar-14

27-Nov-13

13-Sep-13

11-Dec-13

27-Nov-13

19-Nov-13

20-Dec-13

4-Dec-14
4-Dec-14
27-Nov-13
27-Nov-13

13-Sep-13
13-Sep-13

9-Jan-14
9-Jan-14

27-Nov-13

13-Sep-13

9-Jan-14

27-Dec-13
27-Sep-13
27-Dec-13

13-Sep-13
13-Sep-13
13-Sep-13

24-Oct-13
19-Nov-13
11-Dec-13

LNTP
LNTP
LNTP
LNTP

12-Mar-14
12-Mar-14
28-Feb-14

10-Mar-14

LNTP
NTPLNTP
NTP
LNTP

I
I
I
I
I
I
A
A

4 (i)
4 (i)
4 (i)
5 (ii)
2 (ii)
5 (i)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

11-Mar-15
27-Nov-13
27-Nov-13
8-Nov-14
27-Dec-13

16-Jul-14
7-Apr-14

8-May-14

5 OF 276

C
C
C
C
B
C
B
C
C
C
C
C

B
B

20-Jan-14
26-Feb-14

13-Feb-14
3-Apr-14

19-Apr-14

9-May-14

7-Jun-14

18-Jul-14

4-Apr-14

2-May-14

17-Apr-14
26-Feb-14

2-May-14
3-Apr-14

28-Feb-14

4-May-14

6-Mar-14

26-Apr-14

6-Feb-14

10-Mar-14

6-Feb-14

10-Mar-14

6-Feb-14

10-Mar-14

1-Jan-14

31-Jan-14

15-Feb-14

26-Mar-14

B
B

12-Jun-14
15-Jan-14

19-Feb-14

28-Feb-14

16-Mar-14

8-Jan-14

13-Feb-14

26-Feb-14
11-Oct-13

15-Mar-14
24-Dec-13

12-Nov-13

20-Jan-14

12-Nov-13

3-Feb-14

12-Nov-13

3-Feb-14

12-Nov-13

16-Jan-14

12-Nov-13

16-Jan-14

12-Nov-13

16-Jan-14

21-Nov-13

20-Dec-13

9-Jan-14

10-Feb-14

23-Jun-14

8-Jul-14

9-Nov-13
7-Dec-13
1-Jan-14

5-Dec-13
31-Jan-14
5-Feb-14

B
B
B
C
B
B
B
C

B
F
B
B
B
C
C
C

16-Jul-14
16-Jul-14
16-Jul-14

F
C
C
C

C
C
B

C
C
A

E
E
C

E
E

E
C
C
C

E
C
B

27-Jun-14

8-Jul-14

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
438

PEM

AUX SYSTEM

439
440

PEM
PEM

PH STR
C&I

441

PEM

C&I

ELE
CIV
C&I

BTG-ASN-DWG-E-0010

PE-DG-391-565-E001

BTG-UMA-DWG-S-0008
BTG-CCA-DSH-I-0040

PE-DG-391-611-C059
PE-DM-391-145-I002

ELECTRICAL SINGLE LINE DIAGRAM FOR AUXILIARY POWER


DISTRIBUTION
PH BLDG. - FOUNDATION LOADING
DRIVE CONTROL PHILOSOPHY(Station C&I)

BTG-XXX-DSH-I-00141

PE-DM-391-145-I900

CONTROL SYSTEM FOR MECHANICAL AUXILIARY PACKAGES

LNTP
Purpose reference
(I/ A)
A
A

COMP_S

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

2 (ii)

NTP
LNTP

3 (vi)

NTPLNTP

A
A

27-Sep-13

4-Sep-13

1-Oct-13

27-Oct-13
4-Jan-14

25-Sep-13
4-Jan-14

8-Nov-13
15-Jan-14

6-Mar-14

6-Mar-14

13-Mar-14

C&I
442

PEM

C&I

443
444
445
446
447

PEM
PEM
PEM
PEM
PEM

C&I
C&I
INSULATION
POWER
CYCLE
POWER
CYCLE

448

PEM

C&I

449

PEM

C&I

C&I
C&I
C&I
MPL
MSE
MSE
C&I

PEM

C&I

C&I

451
452

PEM
PEM

C&I
C&I

C&I

453
454
455

PEM
PEM
PEM

C&I
C&I
C&I

C&I
C&I

456

PEM

C&I

457
458
459

PEM
PEM
PEM

460

PEM

C&I
C&I
PROTECTION
& CONTROL
SYSTEM
AUXILIARY
SYSTEM

461

PEM

AUXILIARY
SYSTEM

462

PEM

LAYOUT

C&I

C&I
C&I
C&I
C&I
ELE
ELE
ELE

Err:512

PE-QP-391-145-I005

QUALITY PLAN FOR FLOW NOZZLES

Err:512
Err:512
BTG-XXX-SCH-M-0098
BTG-XXX-SCH-M-0099

PE-QP-391-145-I006
PE-QP-391-145-I007
PEQP391169M031
PE-SC-391-100-N121
PE-SC-391-100-N122

QUALITY PLAN FOR CONTROL VALVES


QUALITY PLAN FOR FLOW ORIFICE
QUALITY PLAN FOR RESIN BONDED MINERAL (ROCK)WOOL
INSULATION
PIPE SCHEDULE (POWER CYCLE )
VALVE SCHEDULE ( POWER CYCLE )

BTG-XXX-SCH-I-0042

PE-SC-391-145-I102

SCHEDULE OF INSTRUMENTS(Station C&I)

BTG-XXX-DWG-I-0050

PE-SC-391-145-I106

SENSOR/TRANSMITTER GROUPING(Station C&I)

I
I

NTP

I
I

NTP

BTG-XXX-DWG-I-0052

PE-SC-391-145-I106

SENSOR/TRANSMITTER GROUPING(Station C&I)

PEM

LAYOUT

PE-SC-391-145-I201
PE-SC-391-145-I200

BINARY I/O LIST(Station C&I)


BINARY DRIVE LIST(Station C&I)

BTG-XXX-LIST-I-0046
BTG-XXX-LIST-I-0045
BTG-XXX-DWG-I-0053

PE-SC-391-145-I301
PE-SC-391-145-I300
PE-SC-391-145-I502

ANALOG I/O LIST(Station C&I)


ANALOG DRIVE LIST(Station C&I)
DISPLAYS

BTG-XXX-DWG-I-0054

PE-SC-391-145-I511

LOGS

BTG-XXX-DSH-I-0047
BTG-BLA-DWG-E-0104

PE-TS-391-145-I104
PE-V0-391-145-IXXX
PE-DC-391-510-E004

CONTROL VALVES DESIGN PARAMETERS


O&M MANUAL CONTROL VALVES
RELAY SETTINGS CHART FOR GENERATOR CIRCUIT
PROTECTION [STG]

BTG-BHR-DWG-E-0105

PE-DC-391-565-E004

RELAY SETTINGS CHART FOR MV /LV SYSTEM (OTHER THAN


MOTORS)

BTG-BLA-DWG-E-0106

PE-DC-391-565-E005

RELAY SETTINGS CHART FOR MV/LV MOTORS

BTG-BCA-SCH-E-0107

PE-DG-391-100-E007

LAYOUT OF DC EQUIPMENT ROOM

PEM

BTG-BCA-SCH-E-0108

LAYOUT

PE-DG-391-100-E009

PEM

PE-DG-391-100-E010

PEM

PE-DG-391-100-E013

PEM

BTG-CWF-SCH-E-0111

LAYOUT

PE-DG-391-100-E015

BTG-CBA-SCH-E-0112

PE-DG-391-100-E016

ELE
468

PEM

LAYOUT

BTG-XXX-SCH-E-0113

PE-DG-391-100-E017

ELE
469

PEM

LAYOUT

PEM

BTG-XXX-SCH-E-0114

LAYOUT

PEM

LAYOUT

472

PEM

LAYOUT

473

PEM

LAYOUT

474

PEM

PRTN & CTRL

475

PEM

PRTN & CTRL

476

PEM

PRTN & CTRL

477

PEM

PRTN & CTRL

478

PEM

MV SYSTEM

479

PEM

MV SYSTEM

480

PEM

MV SYSTEM

481

PEM

LV SYSTEM

482

PEM

LV SYSTEM

483

PEM

LV SYSTEM

484

PEM

LT SWGR

485

PEM

LT SWGR

486

PEM

LT SWGR

487

PEM

LT SWGR

488

PEM

LT SWGR

489

PEM

LT SWGR

490

PEM

LT SWGR

491

PEM

LT SWGR

492

PEM

LT SWGR

ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

18-Jan-14
28-May-14

15-Mar-14

22-Mar-14

24-Dec-13

31-Jan-14

28-Feb-14

6-Apr-14

24-Dec-13
24-Dec-13

31-Jan-14
31-Jan-14

B
B

28-Feb-14
28-Feb-14

6-Apr-14
6-Apr-14

5 (i)
4 (i)
4 (i)

LNTP
NTP

6-Mar-14
6-Mar-14

15-Apr-14
15-Apr-14

13-May-14
13-May-14

23-May-14
23-May-14

6-Mar-14

9-May-14

PE-DG-391-100-E036

PE-DG-391-100-E037

C
C

9-Nov-13
9-Nov-13
7-Dec-13
20-Sep-13
20-Sep-13

12-Dec-13
12-Dec-13
3-Jan-14
18-Feb-14
18-Feb-14

1-Jan-14

11-Feb-14

4-Jan-14

24-Jan-14

28-Feb-14

22-Mar-14

9-Apr-14

9-Nov-13

26-Feb-14

26-Mar-14

9-May-14

30-May-14

C
B
C
A
C
C

NTP
NTP
NTP
NTP

NTP
NTP
A
I

NTP NTP

NTP

15-Dec-14
4-Jan-14
5-Dec-14

20-Apr-16
NTP
20-Apr-16

I
NTP

19-Nov-14

NTP

17-Dec-14

NTP

28-Jan-15

NTP

28-Jan-15

NTP

20-May-15

ELECTRICAL EQUIPMENT & CABLING LAYOUT IN AC PLANT


ROOM & AHU AREA

NTP

3-Jun-15

ELECT. EQPT & CABLE TRAY LAYOUT IN COMPRESSOR


PLANT

NTP

17-Jun-15

CABLE TRAY LAYOUT ON BOILER PLATFORMS

NTP

16-Dec-15

CABLING LAYOUT IN TG HALL (GROUND FLOOR)


A

NTP

2-Sep-15

NTP

BTG-BLA-SCH-E-0116

PE-DG-391-100-E038

CABLING LAYOUT IN TG HALL (BELOW OPERATING FLOOR)

NTP

BTG-BLA-SCH-E-0117

PE-DG-391-100-E039

CABLING LAYOUT IN TG HALL (DEAERATOR FLOOR,


ADJOINING AREAS & RE UNITS)

NTP

BTG-BHA-SCH-E-0118

PE-DG-391-100-E041

CABLING LAYOUT FROM MAIN POWER HOUSE TO BOILER


AREA

NTP

BTG-BHA-SCH-E-0119

PE-DG-391-510-E113

INTERFACE SCHEME FOR ELECTRICAL CONTROL PANEL


(ECP)

NTP

BTG-BLA-SCH-E-0120

PE-DG-391-510-E114

ALARM SCHEDULE FOR ELECTRICAL CONTROL PANEL (ECP)

NTP

BTG-BLA-SCH-E-0121

PE-DG-391-510-E153

LOGIC DIAGRAM FOR ELECTRICAL CONTROL PANEL AND


ASSOCIATED DDCMIS

NTP

BTG-BLA-SCH-E-0122

PE-DG-391-510-E154

LOGIC DIAGRAM FOR CIRCUIT BREAKERS CONTROLLED


FROM DDCMIS ONLY

NTP

BTG-BLA-SCH-E-0123

PE-IC-391-505-E101

INTERCONNECTION DIAGRAM FOR 11KV UNIT


SWITCHBOARD

NTP

BTG-BHA-SCH-E-0124

PE-IC-391-505-E108

INTERCONNECTION DIAGRAM FOR 3.3KV UNIT AUXILIARY


SWITCHBOARD

NTP

BTG-BHA-SCH-E-0125

PE-IC-391-505-E109

INTERCONNECTION DIAGRAM FOR 3.3KV STATION AUXILIARY


SWITCHBOARD

NTP

BTG-BLA-SCH-E-0126

PE-IC-391-506-E001

INTERCONNECTION DIAGRAM FOR BREAKER CONTROLLED


DRIVES

NTP

BTG-BLA-SCH-E-0127

PE-IC-391-506-E002

INTERCONNECTION DIAGRAM FOR UNI-DIRECTIONAL


DRIVES

NTP

BTG-BLA-SCH-E-0128

PE-IC-391-506-E003

INTERCONNECTION DIAGRAM FOR BI-DIRECTIONAL DRIVES

NTP

BTG-BLA-SCH-E-0129

PE-IC-391-506-E101

INTERCONNECTION DIAGRAM FOR UNIT SERVICE SWBD.-1

NTP

BTG-BMA-SCH-E-0130

PE-IC-391-506-E102

INTERCONNECTION DIAGRAM FOR UNIT SERVICE SWBD.-2

NTP

BTG-BMA-SCH-E-0131

PE-IC-391-506-E105

INTERCONNECTION DIAGRAM FOR BOILER MCC-1

NTP

BTG-BUA-SCH-E-0132

PE-IC-391-506-E106

INTERCONNECTION DIAGRAM FOR BOILER MCC-2

NTP

BTG-BUA-SCH-E-0133

PE-IC-391-506-E117

INTERCONNECTION DIAGRAM FOR BOILER ACDB-1

NTP

BTG-BHR-SCH-E-0134

PE-IC-391-506-E118

INTERCONNECTION DIAGRAM FOR BOILER ACDB-2

NTP

BTG-BHR-SCH-E-0135

PE-IC-391-506-E121

INTERCONNECTION DIAGRAM FOR TURBINE MCC-1

NTP

BTG-BLA-SCH-E-0136

PE-IC-391-506-E122

INTERCONNECTION DIAGRAM FOR TURBINE MCC-2

BTG-BLA-SCH-E-0137

PE-IC-391-506-E133

INTERCONNECTION DIAGRAM FOR UNIT SERVICE ACDB-1

I
I

16-Sep-15
30-Sep-15
7-Oct-15
29-Jul-15
3-Jun-15
17-Jun-15
1-Jul-15
9-Mar-16
9-Mar-16
9-Mar-16
24-Feb-16
24-Feb-16
24-Feb-16
4-May-16
4-May-16
4-May-16
4-May-16
4-May-16
4-May-16
4-May-16
4-May-16
4-May-16

6 OF 276

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

22-Jan-14

15-Apr-14

15-May-14

27-May-14

21-Jul-14

A
C
A

9-Apr-14

5-Jun-14
18-Jun-14

16-Dec-14
9-Nov-13
26-May-16
4-May-16

R3APP CAT

5-Mar-15

R3APP_A_DT

B
C

5-Mar-15

15-Dec-14
1-Jan-14

R3SUB_A_DT

20-Dec-13
15-Dec-13
27-Dec-13
27-Nov-13
27-Nov-13

A
BTG-BTN-SCH-E-0115

ELE

12-Jun-14

9-Jan-14
9-Apr-14

NTP

ELECTRICAL EQUIPMENT & CABLING LAYOUT IN AIR


WASHER ROOM

ELE
471

30-May-14

27-Dec-13
22-Mar-14

31-Dec-14

CABLING LAYOUT BELOW BOILER SWITCHGEAR ROOM

ELE
470

LNTP
LNTP
LNTP
NTPLNTP

ELE
467

29-Apr-14

7-Dec-13
13-Mar-14

12-Dec-13

I
BTG-MKY-SCH-E-0110

LAYOUT

A
A
A
A

CABLING LAYOUT BELOW LV SWGR ROOM

ELE
466

2-Nov-13

9-Nov-13

I
BTG-BCA-SCH-E-0109

LAYOUT

LNTP

CABLING LAYOUT BELOW MV SWGR ROOM

ELE
465

R2SUB_A_DT R2APP_A_DT R2APP


CAT

15-Dec-13

ELE
464

BTG-XXX-LIST-I-0044
BTG-XXX-LIST-I-0043

ELE
463

R1SUB_A_DT R1APP_A_DT R1APP


CAT

C&I
450

FAPP
CAT

18-Jul-14

22-May-14

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
493

PEM

LT SWGR

494

PEM

LT SWGR

495

PEM

LT SWGR

496

PEM

LT SWGR

497

PEM

LT SWGR

498

PEM

LT SWGR

499

PEM

LT SWGR

ELE
ELE
ELE
ELE
ELE
ELE

BTG-BHR-SCH-E-0138

PE-IC-391-506-E134

INTERCONNECTION DIAGRAM FOR UNIT SERVICE ACDB-2

BTG-BHR-SCH-E-0139

PE-IC-391-506-E137

INTERCONNECTION DIAGRAM FOR UNIT EMERGENCY MCC-1

BTG-BLA-SCH-E-0140

PE-IC-391-506-E138

INTERCONNECTION DIAGRAM FOR UNIT EMERGENCY MCC-2

BTG-BHR-SCH-E-0141

PE-IC-391-506-E141

INTERCONNECTION DIAGRAM FOR 220V MAIN DCDB-1

BTG-BHA-SCH-E-0142

PE-IC-391-506-E142

INTERCONNECTION DIAGRAM FOR 220V MAIN DCDB-2

BTG-BHA-SCH-E-0143

PE-IC-391-506-E157

INTERCONNECTION DIAGRAM FOR ESP A/C & VENT MCC-1

BTG-BHR-SCH-E-0144

PE-IC-391-506-E158

INTERCONNECTION DIAGRAM FOR ESP A/C & VENT MCC-2

LNTP
Purpose reference
(I/ A)

PEM

LT SWGR

PEM

BTG-BHR-SCH-E-0145

LT SWGR

PE-IC-391-506-E169

BTG-SCA-SCH-E-0146

PE-IC-391-506-E170

ELE
502

PEM

LT SWGR

PEM

BTG-XXX-SCH-E-0147

LT SWGR

PEM

PEM

FSUB_A_DT

FAPP_A_DT

NTP

NTP

3-Dec-14

21-May-14

4-Jul-14

3-Dec-14

21-May-14

4-Jul-14

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

4-May-16
4-May-16
4-May-16
4-May-16
4-May-16

NTP
4-May-16
NTP

4-May-16

NTP

4-May-16

PE-IC-391-506-E177

INTERCONNECTION DIAGRAM FOR STATION SERVICE


SWBD.-2

NTP

4-May-16

INTERCONNECTION DIAGRAM FOR AIR WASHER MCC-1

NTP

8-Jun-16

PE-IC-391-506-E178

INTERCONNECTION DIAGRAM FOR AIR WASHER MCC-2

NTP

8-Jun-16

NTP

8-Jun-16

NTP

8-Jun-16

I
BTG-XXX-LIST-E-0149

LT SWGR

NTP

PE-IC-391-506-E181

INTERCONNECTION DIAGRAM FOR VENTILATION MCC-1

ELE
505

FSUB_S_DT

I
BTG-MKY-DWG-E-0148

LT SWGR

INTERCONNECTION DIAGRAM FOR STATION SERVICE


SWBD.-1

ELE
504

NTP

ELE
503

COMP_A

ELE
501

COMP_S

2X660 MW IB VALLEY TPS

Remarks
NTP

ELE
500

NTP

I
BTG-CWF-DWG-E-0150

PE-IC-391-506-E182

INTERCONNECTION DIAGRAM FOR VENTILATION MCC-2

ELE

I
NTP

506

PEM

LT SWGR

507

PEM

LT SWGR

ELE

BTG-CWF-DWG-E-0151

PE-IC-391-506-E205

INTERCONNECTION DIAGRAM FOR COMP HOUSE MCC

BTG-CWF-DWG-E-0152

PE-IC-391-506-E216

INTERCONNECTION DIAGRAM FOR AIR CONDITIONING MCC

ELE
508

PEM

LT SWGR

PEM

PRTN & CTRL

510

PEM

PRTN & CTRL

BTG-CWF-SCH-E-0153

511

PEM

PRTN & CTRL

ELE
ELE

PE-IC-391-506-E224

INTERCONNECTION DIAGRAM FOR CPU MCC


I

BTG-XXX-LIST-E-0154

PE-IC-391-510-E161

INTERCONNECTION DIAGRAM FOR GENERATOR RELAY


PANEL (STG)

BTG-XXX-LIST-E-0155

PE-IC-391-510-E164

INTERCONNECTION DIAGRAM FOR ELECTRICAL CONTROL


PANEL (ECP)

BTG-CBA-DWG-E-0156

PE-IC-391-510-E169

INTERCONNECTION DIAGRAM FOR DDCMIS

ELE
512

PEM

PRTN & CTRL

NTP

8-Jun-16

NTP

8-Jun-16

ELE
509

8-Jun-16

NTP
13-Jul-16
NTP
13-Jul-16
NTP

13-Jul-16

NTP

13-Jul-16

I
BTG-CBA-DWG-E-0157

PE-IC-391-510-E170

INTERCONNECTION DIAGRAM FOR AVR CIRCUIT

ELE

I
NTP

513
514

PEM
PEM

PRTN & CTRL

ELE

PRTN & CTRL

BTG-CBA-DWG-E-0158
BTG-CWF-DWG-E-0160

PE-IC-391-510-E171
PE-DC-391-510-E101

ELE
515

PEM

PRTN & CTRL

516

PEM

PRTN & CTRL

517

PEM

PRTN & CTRL

518

PEM

PRTN & CTRL

519

PEM

PRTN & CTRL

520

PEM

LAYOUT

521

PEM

LAYOUT

522

PEM

LAYOUT

523

PEM

LAYOUT

524

PEM

LAYOUT

525

PEM

LAYOUT

526

PEM

LAYOUT

527

PEM

LAYOUT

528

PEM

LAYOUT

ELE
ELE
ELE
ELE
ELE
MPL
MPL
MPL

INTERCONNECTION DIAGRAM FOR MISCELLANEOUS


CIRCUITS

LIST OF CIRCUIT BREAKERS FOR ELECTRICAL SYSTEM AND


THEIR CONTROL LOCATION

PE-DC-391-510-E151

ANALOG INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM

BTG-XXX-DWG-E-0162

PE-DC-391-510-E152

BINARY INPUT/OUTPUT LIST FOR ELECTRICAL SYSTEM

BTG-XXX-DWG-E-012

PE-DG-391-510-E111

SYNCHRONISING SCHEME FOR ELECTRICAL CONTROL


PANEL (ECP)

BTG-BCA-DSH-E-0164

PE-DG-391-510-E112

FRONT VIEW OF ELECTRICAL CONTROL PANEL (ECP)

BTG-BHA-DSH-E-0165

PE-DG-391-510-E155

PLANT ELECTRICAL SCHEMATICS FOR DDCMIS

BTG-XXX-DWG-M-0135

PE-DG-391-100-M031

COMPOSITE PIPING LAYOUT BELOW 0.0M IN AB BAY

BTG-XXX-DWG-M-0136

PE-DG-391-100-M032

COMPOSITE PIPING LAYOUT PLAN BELOW 8.5M FLOOR

BTG-XXX-DWG-M-0137

PE-DG-391-100-M033

COMPOSITE PIPING LAYOUT PLAN BELOW 17.0M FLOOR

3-Dec-14

21-May-14

4-Jul-14

BTG-XXX-DWG-M-0138

PE-DG-391-100-M034

COMPOSITE PIPING LAYOUT PLAN BELOW & ABOVE


DEAERATOR FLOOR

31-Dec-14

21-May-14

4-Jul-14

PE-DG-391-100-M041

LAYOUT OF PIPING IN & AROUND ACW P/H

BTG-XXX-DWG-M-0139

PE-DG-391-100-M042

LAYOUT OF PIPING IN & AROUND CS TANK & P/H

BTG-MAG-DWG-M-0140

PE-DG-391-165-M001

LAYOUT OF CW PIPING LOCAL TO CONDENSER

BTG-QSV-DWG-M-0141

PE-DG-391-167-M221

CENTRAL LUBE OIL PURIFICATION PIPING LAYOUT

BTG-XXX-DWG-M-0142

PE-DG-391-172-M001

SERVICE WATER & DRINKING WATER PIPING LAYOUT INSIDE I


TG BUILDING

NTP

1-Jul-15

BTG-XXX-DWG-M-0143

PE-DG-391-179-M001

ECW & ACW PIPING LAYOUT ABOVE & BELOW 8.5M INSIDE
TG BUILDING

NTP

17-Jun-15

NTP

NTP

NTP

NTP

NTP

MPL

PEM

LAYOUT

PEM

LAYOUT

531

PEM

PH CIVIL

532

PEM

PH CIVIL

533

PEM

PH CIVIL

534

PEM

PH CIVIL

535

PEM

PH CIVIL

536

PEM

C&I

537

PEM

PH CIVIL

538
539

PEM
PEM

PH STR
PH STR

MPL
CIV
CIV
CIV
CIV
CIV
C&I
CIV
CIV
CIV

25-Mar-15
22-Apr-15
15-Jul-15
B
B
B
B

NTP

NTP
A

11-Mar-15
NTP
15-Apr-15
5-Nov-14

13-Jun-14

19-Jun-14

5-Jun-14
12-Jun-14

4-Jul-14
22-Jul-14

NTP

MPL
530

20-May-15

NTP

NTP

MPL
529

6-May-15

NTP

MPL

MPL

25-Feb-15

NTP

BTG-CBA-DWG-E-0161

MPL

MPL

13-Jul-16
NTP

16-Jul-14

20-May-15

NTP

BTG-SCB-DWG-M-0144

PE-DG-391-555-M020

IA & SA PIPING LAYOUT IN TG BUILDING

BTG-XXX-DWG-S-0029

PE-DG-391-611-C031

PH BLDG. - GEN. NOTES & STD. DETAILS FOR ARCH. WORKS I

BTG-UMA-DWG-S-0044

PE-DG-391-611-C032

PH BLDG.- FRONT ELEVATION

BTG-UMA-DWG-S-0045

PE-DG-391-611-C033

PH BLDG.- REAR ELEVATION

BTG-UMA-DWG-S-0046

PE-DG-391-611-C034

PH BLDG.- ELEVATION OF GABLE END

BTG-UMA-DWG-S-0047

PE-DG-391-611-C058

PH BLDG.- ELEVATION OF GABLE END

BTG-XXX-DSH-I-0048

PE-TS-391-145-I105

FLOW ELEMENTS DESIGN PARAMETERS

BTG-UMA-DWG-S-0012

PE-DG-391-611-C062

PH BLDG- CONTROL ROOM - FALSE CEILING CONNECTION


DETAILS

BTG-UMA-DWG-S-0013
BTG-UMA-DWG-S-0014

PE-DG-391-612-C001
PE-DG-391-612-C002

PH BLDG. - STRUCTURAL FRAMING ALONG A ROW


PH BLDG. - STRUCTURAL FRAMING ALONG B ROW

I
I

NTP
NTP
NTP
NTP
NTP
NTP

1-Jul-15
14-Jan-15
21-Jan-15
4-Feb-15
11-Feb-15
26-Aug-15

NTP

17-Sep-14

NTP

18-Nov-15
11-Nov-14
12-Nov-14

7 OF 276

C
C

16-Jul-14

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
540

PEM

PH STR

541

PEM

PH STR

542

PEM

PH STR

543

PEM

PH STR

544

PEM

PH STR

545

PEM

PH STR

546

PEM

PH STR

CIV
CIV
CIV
CIV
CIV
CIV

LNTP
Purpose reference
(I/ A)

PE-DG-391-612-C003

PH BLDG. - STRUCTURAL FRAMING ALONG C ROW

BTG-UMA-DWG-S-0016

PE-DG-391-612-C004

PH BLDG. - STRUCTURAL FRAMING ALONG D & E'A ROW

BTG-XXX-DWG-S-0084

PE-DG-391-612-C006

PH BLDG. - DETAILS OF ROOF TRUSS.

BTG-UMA-DWG-S-0017

PE-DG-391-612-C007

PH BLDG. -GA AND DETAILS OF GANTRY GIRDERS

BTG-UMA-DWG-S-0018

PE-DG-391-612-C008

PH BLDG. -PURLIN DETAILS

BTG-UMA-DWG-S-0019

PE-DG-391-612-C009

PH BLDG.-DETAILS OF INTERMEDIATE COLUMNS

BTG-UMA-DWG-S-0020

PE-DG-391-612-C010

PH BLDG-CLADDING FRAMING ELEVATION ON AXIS A

BTG-UMA-DWG-S-0015

PEM

PH STR

548

PEM

PH STR

549

PEM

PH STR

550

PEM

PH STR

551

PEM

PH STR

552

PEM

PH STR

553

PEM

PH STR

554

PEM

PH STR

555

PEM

PH STR

556

PEM

PH STR

557

PEM

PH STR

558

PEM

PH STR

559

PEM

PH STR

560

PEM

PH STR

561

PEM

PH STR

562

PEM

PH STR

563

PEM

PH STR

564

PEM

PH STR

565

PEM

PH STR

566

PEM

PH STR

567

PEM

PH STR

CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV

COMP_S

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

12-Dec-14

23-Jun-14

22-Jul-14

10-Jun-15

23-Jun-14

21-Jul-14

12-Mar-15

5-Jun-14

4-Jul-14

10-Jun-15

12-Jun-14

21-Jul-14

Remarks
NTP
NTP

12-Dec-14

NTP
NTP
NTP
NTP

C
C
B

20-Jan-15
NTP

CIV
547

NTP

2X660 MW IB VALLEY TPS

8-Sep-15

NTP
BTG-UMA-DWG-S-0085

PE-DG-391-612-C011

PH BLDG-CLADDING FRAMING ELEVATION ON AXIS C

BTG-UMA-DWG-S-0021

PE-DG-391-612-C012

PH BLDG. - (UNIT 3)-DETAILS OF GABLE END COLUMNS

BTG-UMA-DWG-S-0086

PE-DG-391-612-C042

PH BLDG- (UNIT 4)- DETAILS OF GABLE END COLUMNS

BTG-XXX-DWG-S-0022

PE-DG-391-612-C013

PH BLDG. - FRAMING ARRGT. FOR AUXILIARY STRUCTURES


IN AB BAY

BTG-UMA-DWG-S-0023

PE-DG-391-612-C014

PH BLDG- (UNIT 3)-CLADDING FRAMING OF GABLE END

BTG-UMA-DWG-S-0024

PE-DG-391-612-C043

PH BLDG- (UNIT 4)-CLADDING FRAMING OF GABLE END

BTG-UMA-DWG-S-0025

PE-DG-391-612-C015

PH BLDG. -AB-BAY DETAILS OF MISC. PLATEFORMS & STAIRS I

BTG-UMA-DWG-S-0026

PE-DG-391-612-C016

PH BLDG.- DETAILS OF STAIRCASE A-B BAY. MKD. SC-01 &


SC-2

BTG-UMA-DWG-S-0087

PE-DG-391-612-C017

PH BLDG.-AB BAY-DETAILS OF STAIRCASE MKD. SC-03

BTG-UMA-DWG-S-0088

PE-DG-391-612-C018

PH BLDG.-AB BAY-DETAILS OF STAIRCASE MKD. SC-04

BTG-UMA-DWG-S-0089

PE-DG-391-612-C019

PH BLDG.-AB BAY-DETAILS OF STAIRCASE MKD. SC-05

BTG-UMA-DWG-S-0090

PE-DG-391-612-C020

PH BLDG. -OIL CANAL FRAMING PLAN.

BTG-UMA-DWG-S-0091

PE-DG-391-612-C021

PH BLDG. -(AB BAY) FRAMING PLAN AT EL 3.5M FFL

BTG-UMA-DWG-S-0092

PE-DG-391-612-C022

PH BLDG. -(AB BAY-TG) FRAMING PLAN AT EL 8.5M FFL

BTG-UMA-DWG-S-0093

PE-DG-391-612-C023

PH BLDG. -(AB BAY-CR) FRAMING PLAN AT EL 8.5M FFL

BTG-UMA-DWG-S-0094

PE-DG-391-612-C024

PH BLDG.(AB BAY-TG) FRAMING PLAN AT EL +12M FFL

BTG-UMA-DWG-S-0095

PE-DG-391-612-C025

PH BLDG.(AB BAY-TG) - FRAMING PLAN @ EL 17.0M FFL

BTG-UMA-DWG-S-0096

PE-DG-391-612-C026

PH BLDG.(AB BAY-CR) - FRAMING PLAN @ EL 17.0M FFL

BTG-UMA-DWG-S-0097

PE-DG-391-612-C027

PH BLDG. -(UNIT 4) FRAMING PLAN +5.0 M FFL

BTG-UMA-DWG-S-0098

PE-DG-391-612-C028

PH BLDG. - (BC-BAY-TG) FRAMING PLAN 8.5M FFL

1-Mar-15

BTG-UMA-DWG-S-0099

PE-DG-391-612-C029

PH BLDG. - (BC-BAY-CR) FRAMING PLAN 8.5M FFL

1-Mar-15

PE-DG-391-612-C030

PH BLDG. - (BC-BAY-CR) FRAMING PLAN +13.5M FFL

8-Sep-15

NTP

20-Jan-15

NTP

5-Jan-15

NTP

10-Jun-15

NTP

8-Sep-15

NTP

24-Aug-15

NTP

10-Jun-15

NTP

10-Jun-15

NTP

10-Jun-15

NTP

10-Jun-15

NTP

10-Jun-15

NTP

10-Jun-15

NTP

10-Jan-15

NTP

20-Apr-15

NTP

1-Mar-15

NTP

21-Nov-14

NTP

2-Oct-14

NTP

22-Oct-14

NTP

1-Mar-15
NTP

CIV
568

PEM

PH STR

13-Aug-14

CIV
569

PEM

PH STR

NTP
PE-DG-391-612-C031

PH BLDG. - (BC-BAY-TG) FRAMING PLAN +17M FFL

2-Oct-14

CIV
570

PEM

PH STR

NTP
PE-DG-391-612-C032

PH BLDG. - (BC-BAY-CR) FRAMING PLAN +17M FFL

2-Oct-14

CIV
571

PEM

PH STR

NTP
PE-DG-391-612-C033

PH BLDG. - (BC-BAY-TG) FRAMING PLAN +24.0M FFL

13-Aug-14

CIV
572

PEM

PH STR

NTP
PE-DG-391-612-C034

PH BLDG. - (BC-BAY-CR) FRAMING PLAN +24.0M FFL

13-Aug-14

CIV
573

PEM

PH STR

NTP
PE-DG-391-612-C035

PH BLDG. - (BC-BAY)FRAMING PLAN +27.0M FFL

19-Jul-14

CIV
574

PEM

PH STR

NTP
PE-DG-391-612-C036

PH BLDG. - (BC-BAY) FRAMING PLAN +32.5M FFL

14-Jul-14

CIV
575

PEM

PH STR

PE-DG-391-612-C037

PH BLDG. - (BC-BAY) FRAMING PLAN +36.0M LVL

13-Aug-14

CIV
576

PEM

PH STR

NTP
PE-DG-391-612-C038

PH BLDG.(UNIT 3 &4)- (BC-BAY) FRAMING PLAN +25.5 M FFL

2-Oct-14

CIV
577

PEM

PH STR

NTP
PE-DG-391-612-C039

CIV
578

PEM

PH STR

PE-DG-391-612-C040
CIV

579

PEM

PH STR

PE-DG-391-612-C041

PH BLDG. -VENTILLATION AND BUS DUCT SUPPORTING


STRUCTURE ALONG AXIS-A

PH BLDG. -PIPE AND CABLE SUPPORTING STRUCTURE


ALONG AXIS-C

PH BLDG. -MISC. DETAILS

12-Dec-14
NTP
13-Oct-14
NTP
22-Nov-14

CIV
580

PEM

T.G. FDN

NTP
PE-DG-391-613-C001

T.G. FDN -GA & LOADING OF PLATFORM BELOW TG DECK

CIV
581

PEM

T.G. FDN

582

PEM

MILL STR

583

PEM

MILL STR

PE-DG-391-613-C002

T.G. FDN -DETAIL OF PLATFORM BELOW TG DECK

PE-DG-391-616-C010

BUNKER BAY - FRAMING PLAN OF FEEDER FLOOR

BUNKER BAY - FRAMING PLAN OF TRIPPER FLOOR

CIV

10-Feb-15

13-Jun-14

19-Jun-14

F
1-Jan-15

11-Jan-15
NTP

PE-DG-391-616-C012
CIV

8-Jul-14

NTP
PE-DG-391-616-C011

MILL STR

27-Jun-14

NTP

CIV

PEM

2-Mar-15
NTP

CIV

584

16-Jul-14

NTP

BUNKER BAY - FRAMING PLAN OF BUNKER ROOF.

21-Jan-15
NTP

8 OF 276

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
585

PEM

MILL STR

PE-DG-391-616-C013

LNTP
Purpose reference
(I/ A)

COMP_S
Remarks

BUNKER'S BAY - CLADDING AND MIS.DETAILS

2X660 MW IB VALLEY TPS


FAPP_A_DT

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

31-Jan-15

CIV

NTP
NTP

586

PEM

MILL STR

PE-DG-391-616-C014

BUNKER BAY - G.A. OF BUNKERS & SUPPORTING DETAILS

587
588

PEM
PEM

MILL STR
MILL STR

589

PEM

MILL STR

590

PEM

RACKS

591

PEM

RACKS

592

PEM

RACKS

CIV

BTG-UMA-DWG-S-0100
BTG-UMA-DWG-S-0101

PE-DG-391-616-C015
PE-DG-391-616-C016

BUNKER BAY - DETAILS OF BUNKERS & SUPPORTING


DETAILS
BUNKER'S BAY - ARCH ELEVATIONS (SH-1)

CIV

A
A

CIV

BTG-UMA-DWG-S-0102

PE-DG-391-616-C017

BUNKER'S BAY - ARCH. ELEVATIONS (SH-2)

BTG-UMA-DWG-S-0103

PE-DG-391-675-C001

PIPE RACK PR-1 - FOUNDATION LOADING

CIV

BTG-UMA-DWG-S-0104

PE-DG-391-675-C002

PIPE RACK PR-1 - STRUCTURAL STEEL DETAILS

CIV

BTG-UMA-DWG-S-0027

PE-DG-391-675-C003

PIPE RACK PR-2 - FOUNDATION LOADING

NTP

31-Dec-14

BTG-XXX-DWG-S-0028

PE-DG-391-675-C004

PIPE RACK PR-2 - STRUCTURAL STEEL DETAILS

NTP

10-Jan-15

12-Mar-15

NTP NTP

CIV

NTP

22-Mar-15
6-Apr-15

NTP

11-Apr-15

NTP

11-Dec-14
NTP
21-Dec-14

CIV
593

PEM

RACKS
CIV

594

PEM

RACKS

595

PEM

RACKS

596

PEM

RACKS

597

PEM

RACKS

598

PEM

RACKS

599

PEM

RACKS

600

PEM

RACKS

601

PEM

RACKS

CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV

602

PEM

RACKS

603

PEM

RACKS

604

PEM

CPU

605

PEM

CPU

606

PEM

MRS

607

PEM

MRS

608

PEM

CST

609

PEM

D/G EOT
CRANE

610

PEM

D/G EOT
CRANE

MAX

611

PEM

D/G EOT
CRANE

MAX

612

PEM

D/G EOT
CRANE

613

PEM

ELEVATOR

614

PEM

ELEVATOR

615

PEM

AC

616

PEM

AC

617

PEM

VENTILATION

618

PEM

VENTILATION

619

PEM

COMPRESSED
AIR

620
621

PC
PC

622
623

CIV
CIV
MAX

NTP
BTG-UMA-DWG-S-0105

PE-DG-391-675-C005

PIPE RACK PR-3 - FOUNDATION LOADING

BTG-UMA-DWG-S-0106

PE-DG-391-675-C006

PIPE RACK PR-3 - STRUCTURAL STEEL DETAILS

BTG-XXX-DWG-S-0034

PE-DG-391-675-C007

PIPE RACK PR-4 - FOUNDATION LOADING

BTG-XXX-DWG-S-0035

PE-DG-391-675-C008

PIPE RACK PR-4 - STRUCTURAL STEEL DETAILS

BTG-XXX-DWG-S-0036

PE-DG-391-675-C009

PIPE RACK PR-5 - FOUNDATION LOADING

BTG-UNY-DWG-S-0037

PE-DG-391-675-C010

PIPE RACK PR-5 - STRUCTURAL STEEL DETAILS

BTG-UMY-DWG-S-0038

PE-DG-391-675-C011

PIPE RACK PR-6 - FOUNDATION LOADING

BTG-UNY-DWG-S-0039

PE-DG-391-675-C012

PIPE RACK PR-6 - STRUCTURAL STEEL DETAILS

BTG-UMY-DWG-S-0040

PE-DG-391-675-C013

PIPE RACK PR-7 - FOUNDATION LOADING

BTG-UNY-DWG-S-0041

PE-DG-391-675-C014

PIPE RACK PR-7 - STRUCTURAL STEEL DETAILS

BTG-LD-DWG-M-0147

PE-V0-391-155-AXXX

VENDOR DWGS FOR CONDENSATE POLISHING UNIT

PE-V0-391-155-AXXX

O&M MANUAL FOR CPU

PE-V0-391-160-AXXX

VENDOR DWGS FOR MILL REJECT HANDLING SYSTEM

PE-V0-391-160-AXXX

O&M MANUAL FOR MRS

BTG-XXX-DWG-M-0149

PE-V0-391-167-AXXX

VENDOR DWGS FOR MISC. TANKS ( SITE FABRICATED)

BTG-SML-DWG-M-0150

PE-V0-391-501- AXXX

VENDOR DWGS FOR D/G EOT CRANE UPTO 50 T CAPCITY

MAX

PE-V0-391-501- AXXX

O&M MANUAL FOR D/G EOT CRANE UPTO 50 T CAPCITY

PE-V0-391-501- AXXX

VENDOR DWGS FOR D/G EOT CRANE MORE THAN 50 T


CAPCITY

PE-V0-391-501- AXXX

O&M MANUAL FOR D/G EOT CRANE MORE THAN 50 T


CAPCITY

PE-V0-391-502- AXXX

VENDOR DWGS FOR ELEVATORS

PE-V0-391-502- AXXX

O&M MANUAL FOR ELEVATORS

PE-V0-391-553- AXXX

VENDOR DWGS FOR AIR CONDITIONING SYSTEM

PE-V0-391-553- AXXX

O&M MANUAL FOR AIR CONDITIONING SYSTEM

PE-V0-391-554- AXXX

VENDOR DWGS FOR VENTILATION SYSTEM

BTG-HFE-DWG-M-0148

BTG-SML-DWG-M-0151

MAX
MAX

BTG-SNM-DWG-M-0154

MAX
MAX

BTG-SAL-DWG-M-0155

MAX
MAX

BTG-SAL-DWG-M-0156

9-Feb-15

NTP

19-Feb-15

NTP
A

1-Mar-15

NTP

11-Mar-15
21-Mar-15

NTP

31-Mar-15
10-Apr-15

NTP

20-Apr-15

PE-V0-391-554- AXXX

O&M MANUAL FOR VENTILATION SYSTEM

BTG-SCB-DWG-M-0157

PE-V0-391-555- AXXX

VENDOR DWGS FOR COMPRESSED AIR SYSTEM

MDL
P&ID

Err:512
BTG-XXX-DWG-M-0159

4-00-306-40221
0-00-303-31371

MASTER DRAWING LIST-PC


Scheme of cooling water supply & return

PC
PC

P&ID
P&ID

BTG-XXX-DWG-M-0160
BTG-LPG-DWG-M-0161

0-00-301-31372
1-00-305-32576

Scheme of LP start-up system


Scheme of aux. Steam to Scaph & Scaph drain

624

PC

P&ID

BTG-SCB-DWG-M-0162

1-00-301-32577

Scheme of Instrument air

625

PC

P&ID

BTG-SCB-DWG-M-012

1-00-301-32578

Scheme of Service air

626

PC

P&ID

BTG-PCB-DWG-M-0164

1-00-305-32579

Scheme of APHWW & FF

627

PC

P&ID

BTG-HFE-DWG-M-0165

2-00-305-31717

Scheme of aux. Steam piping to Mill inerting system

628
629

PC
PC

P&ID
P&ID

BTG-PC-DWG-M-0166
BTG-XXX-SCH-M-0169

2-00-305-31718
4-00-306-40095

Scheme of service water to mills


Valve schedule of aux. Steam to SCAPH & SCAPH drains

630

PC

P&ID

BTG-LPG-SCH-M-0170

4-00-306-40096

Valve schedule cooling water supply and return

631
632
633

PC
PC
PC

P&ID
P&ID
P&ID

BTG-SCB-SCH-M-0171
BTG-SCB-SCH-M-0172
BTG-PCB-SCH-M-0173

4-00-306-40097
4-00-306-40098
4-00-306-40099

Valve schedule of instrument air


Valve schedule of service air
Valve schedule of service water to Mills

I
I

634
635

PC
PC

P&ID
P&ID

BTG-PCB-SCH-M-0174
BTG-LPG-SCH-M-0175

4-00-306-40100
4-00-306-40101

Valve schedule of APH WW & FF


Valve schedule of aux. Steam piping to mill inerting

636
637
638
639
640

PC
PC
PC
PC
PC

P&ID
P&ID
P&ID
P&ID
P&ID

BTG-HAA-SCH-M-0178
BTG-XXX-SCH-M-0179
BTG-XXX-SCH-I-0055

4-00-306-40122
4-00-306-40108
3-81-411-02614
3-81-412-02673
3-81-412-02674

Valve schedule of LP start-up system


Pipe Schedule
Instrument Schedule
Installation of pressure instruments
Installation of temperature stub for temperature gauges

I
I
I
I

641
642
643
644
645

PC
PC
PC
PC
PC

P&ID
P&ID
P&ID
P&ID
P&ID

3-81-412-02675
3-81-412-02676
3-81-414-05480
3-81-414-05298
3-81-414-05479

Installation of level gauges


Installation of level switches
Control valve schedule
Requirement of instrument air list
Schedule of motors and MOVs

I
I
I
I
A

MAX
MAX

30-Jan-15

NTP

NTP

MAX
MAX

20-Jan-15

NTP
A

NTP

MAX
MAX

I
A
A
A
A
A
A
A
A
I
I

27-Jan-15

NTP

26-May-16

NTP

14-Apr-15

NTP

26-Sep-16

NTP NTP

8-Dec-14
15-Sep-14

NTP

26-Dec-15

NTP

26-Nov-14

NTP

26-Jul-15

NTP

11-Jul-15

NTP

26-Oct-15

NTP

1-Mar-15

NTP

26-Mar-16

NTP

1-Mar-15

NTP

26-Mar-16

NTP

26-Oct-14
1 (i)
4 (iii)

LNTP

4 (iii)
4 (iii)

LNTP

4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)

LNTP

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

4 (iii)
4 (iii)
4 (iii)

LNTP
LNTP

4 (iii)
4 (iii)

LNTP

4 (iii)
4 (i)
4 (i)
4 (i)
4 (i)

LNTP
LNTP
LNTP
LNTP

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

LNTP
LNTP
LNTP
LNTP
LNTP

LNTP

LNTP

LNTP

4-Jan-14

27-Jan-14

8/26/2013
27-Nov-13

26-Aug-13
12-Nov-13

24-Sep-13
20-Dec-13

27-Nov-13
27-Nov-13

12-Nov-13
12-Nov-13

20-Dec-13
20-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13

12-Nov-13

24-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13
27-Nov-13

12-Nov-13
13-Nov-13

20-Dec-13
26-Dec-13

27-Nov-13

13-Nov-13

31-Dec-13

27-Nov-13
27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13
13-Nov-13

26-Dec-13
26-Dec-13
26-Dec-13

F
B

27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13

26-Dec-13
31-Dec-13

27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13
21-Nov-13
26-Nov-13
26-Nov-13

31-Dec-13
27-Jan-14
30-Nov-13
3-Jan-14
3-Jan-14

B
B
B
E

27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13

26-Nov-13
26-Nov-13
26-Nov-13
26-Nov-13
26-Nov-13

3-Jan-14
3-Jan-14
3-Jan-14
3-Jan-14

E
E
E
E

9 OF 276

B
B
B
A

10-Oct-13
4-Jan-14

4-Nov-13
27-Jan-14

4-Jan-14

27-Jan-14

A
A

24-May-14
24-May-14
26-Mar-14

6-Apr-14

4-Jan-14

27-Jan-14

24-May-14

4-Jul-14

24-May-14
4-Jan-14
24-May-14

27-Jan-14
4-Jul-14

26-Mar-14
24-May-14

6-Apr-14
4-Jul-14

24-May-14
31-Jan-14
4-Jan-14

4-Jul-14
11-Feb-14
28-Jan-14

24-May-14

A
A
B
F

24-May-14

4-Jul-14

E
B

24-May-14

E
F

24-May-14

4-Jul-14

9-Apr-14

21-Jul-14

E
E
E
C

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

PC

P&ID

3-81-414-05478

List of transmitters and temperature element

647

PC

PIPING
LAYOUT

BTG-XXX-DWG-M-0180

0-00-307-31397

Layout of NonCritical Piping in Boiler Area

648

PC

PIPING
LAYOUT

BTG-XXX-DWG-M-0181

0-00-307-31398

Layout of LP Piping in Boiler Area

649
650

JHS
JHS

MDL
PWR TRFR

Err:512
BTG-XXX-DSH-M-0182

JHS-MDL-001
TRE/70879-80A/TDS

MASTER DRAWING LIST-JHS


Technical Data Sheet for 16 MVA UAT & SAT

651

PEM

COMPRESSED
AIR

PE-V0-391-555- AXXX

O&M MANUAL FOR COMPRESSED AIR SYSTEM

652

JHS

PWR TRFR

BTG-BBT-MNL-E-0522

TRE/70879-80A/O&M

O & M Manual for 16 MVA UAT & SAT


NTP

653

JHS

PWR TRFR

BTG-BBT-QAD-E-0523

654

JHS

PWR TRFR

BTG-BBT-DWG-E-0507

14560050843

Outline General Arrangement for 16 MVA UAT & SAT

655

JHS

PWR TRFR

BTG-UMC-DWG-S-0050

24560050915

Foundation Plan of 16 MVA UAT & SAT

656

JHS

PWR TRFR

BTG-BBT-DWG-E-0167

34560051838

Roller Assembly of 16 MVA UAT & SAT

657

JHS

PWR TRFR

BTG-BBT-DWG-E-0508

14561951394

Rating & Diagram plate of 16 MVA UAT & SAT

15-May-14

658

JHS

PWR TRFR

BTG-BBT-DWG-E-0168

24560050916

HV Cable Box Assy of 16 MVA UAT & SAT

15-May-14

659

JHS

PWR TRFR

BTG-BBT-DWG-E-016

34560051840

HV Bushing Assy of 16 MVA UAT & SAT

660

JHS

PWR TRFR

BTG-BBT-DWG-E-0170

34560051841

LV & LVN Bushing Assy of 16 MVA UAT & SAT

661

JHS

PWR TRFR

BTG-BBT-DWG-E-0171

34561951011

Caution Plate for Tap Switch of 16 MVA UAT & SAT

662

JHS

PWR TRFR

BTG-BBT-DWG-E-0172

G A of Marshalling Box of 16 MVA UAT & SAT

663

JHS

PWR TRFR

BTG-BBT-DWG-E-0509

Diagram of Cooler control gear of 16 MVA UAT & SAT

664

JHS

PWR TRFR

BTG-BBT-SCH-E-0173

TRE/70879-80A/CITS

Customer Inspection Test Schedule of 16 MVA UAT & SAT

665

JHS

PWR TRFR

BTG-BBT-DSH-E-0174

TRE/70878A/TDS

Technical Data Sheet for 50 MVA UT

666

JHS

PWR TRFR

BTG-BBT-DWG-E-0510

14560050844

Outline General Arrangement with Table of fittings for 50 MVA UT

667

JHS

PWR TRFR

BTG-BBT-DWG-E-0175

34560051842

HV Bushing Assy of 50 MVA UT

668

JHS

PWR TRFR

BTG-BBT-DWG-E-0176

34560051843

LV & LVN Bushing Assy of 50 MVA UT

669

JHS

PWR TRFR

BTG-UMC-DWG-S-0051

24560050917

Foundation Plan of 50 MVA UT

670

JHS

PWR TRFR

BTG-BBT-DWG-E-0177

14561951395

Rating & Diagram plate of 50 MVA UT

671

JHS

PWR TRFR

BTG-BBT-DWG-E-0178

34560051844

Roller Assembly of 50 MVA UT

672

JHS

PWR TRFR

BTG-BBT-DWG-E-0179

G A of Marshalling Box of 50 MVA UT

673

JHS

PWR TRFR

BTG-XXX-DWG-I-0056

DIAGRAM OF COOLER CONTROL GEAR of 50 MVA UT

674

JHS

PWR TRFR

BTG-BBT-DWG-E-0180

SCHEMATIC DIAGRAM FOR OLTC of 50 MVA UT

675

JHS

PWR TRFR

BTG-BBT-SCH-E-0181

TRE/70878A/CITS

Customer Inspection Test Schedule of 50 MVA UT

676

JHS

DTT

BTG-BFT-DSH-E-0182

TRE/WO70881-82A/DS

Technical Data Sheet for 2500 KVA DTT

677
678

JHS
JHS

DTT
DTT

Err:512
BTG-BFT-DWG-E-0183

3 473 00 51718

Quality Plan for Dry Type Transformer


Outline General Arrangement of 2500 KVA DTT

A
A

679

JHS

DTT

BTG-BFT-LIST-E-0184

3 473 00 51719

List of Fittings for OGAof 2500 KVA DTT

680

JHS

DTT

BTG-BFT-DWG-E-0185

3 473 00 51720

Details and Notes for OGA of 2500 KVA DTT

681

JHS

DTT

BTG-BFT-DWG-E-0186

3 473 19 50931

Rating and Diagram Plateof 2500 KVA DTT

682
683

JHS
JHS

DTT
DTT

BTG-BFT-DWG-E-0187
Err:512

3 473 00 51721
TRE/WO70881-82A/O&M

Marshalling Box of 2500 KVA DTT


O & M Manual for 2500 KVA DTT
NTP

I
I

684
685
686
687

JHS
JHS
JHS
JHS

DTT
DTT
DTT
DTT

BTG-BFT-DWG-E-0188
BTG-BFT-DWG-E-0189
BTG-BFT-DWG-E-0190
BTG-BFT-SCH-E-0191

3 473 06 50695
3 473 62 50338
3 473 03 50255
TRE/WO70881A/TI

H.V Cable Box Assy of 2500 KVA DTT


Wiring Diagram of 2500 KVA DTT
H.V Bushing Epoxy of 2500 KVA DTT
Test Instruction Schedule of 2500 KVA DTT

I
I
I
A

688

JHS

DTT

BTG-BFT-DSH-E-0192

TRE/WO70881-82A/DS

Technical Data Sheet of 1600 KVA DTT

689
690

JHS
JHS

DTT
DTT

Err:512
BTG-BFT-DWG-E-0193

TRE/WO70881-82A/DS
3 473 00 51722

NTP
O & M Manual of 1600 KVA DTT
Outline General Arrangement of 1600 KVA DTT

I
A

691

JHS

DTT

BTG-BFT-LIST-E-0194

3 473 00 51723

List of Fittings for OGA of 1600 KVA DTT

692

JHS

DTT

BTG-BFT-DWG-E-0195

3 473 00 51724

Details and Notes for OGA of 1600 KVA DTT

693

JHS

DTT

BTG-BFT-DWG-E-0196

3 473 19 50932

Rating and Diagram Plate of 1600 KVA DTT

694
695
696
697
698

JHS
JHS
JHS
JHS
JHS

DTT
DTT
DTT
DTT
DTT

BTG-BFT-DWG-E-0197
BTG-BFT-DWG-E-0198
BTG-BFT-DWG-E-0199
BTG-BFT-DWG-E-0200
BTG-BFT-SCH-E-0201

3 473 00 51725
3 473 06 50696
3 473 62 50339
3 473 03 50256
TRE/WO70882A/TI

Marshalling Box of 1600 KVA DTT


H.V Cable Box Assy of 1600 KVA DTT
Wiring Diagram of 1600 KVA DTT
H.V Bushing Epoxy of 1600 KVA DTT
Test Instruction Schedule of 1600 KVA DTT

I
I
I
I
A

699

JHS

ESP TRFR

BTG-BFT-DSH-E-0202

TRE/WO70883A/DS

Technical Data Sheet for 95KVp ESP TRFR

700

JHS

PWR TRFR

Err:512

701

JHS

ESP TRFR

Err:512

TRE/WO70883A/O&M

O & M Manual for 95KVp ESP TRFR


NTP

702

JHS

ESP TRFR

BTG-BFT-DWG-E-0203

1 467 00 50392

Outline General Arrangement for 95KVp ESP TRFR

703

JHS

ESP TRFR

BTG-BFT-DWG-E-0204

2 467 00 50703

Rating and Diagram Plate for 95KVp ESP TRFR

704

JHS

ESP TRFR

BTG-BFT-DWG-E-0205

3 467 62 50682

Wiring Diagram for 95KVp ESP TRFR

705

JHS

ESP TRFR

BTG-BFT-DWG-E-0206

3 467 62 50683

GA of Thermometer Box for 95KVp ESP TRFR

706

JHS

ESP TRFR

BTG-BFT-SCH-E-0207

TRE/WO70883A/TI

Test Instruction Schedule for 95KVp ESP TRFR

MAX

Quality Plan for Power Transformer

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

646

FAPP
CAT

27-Nov-13

26-Nov-13

3-Jan-14

27-Jan-14

13-Jan-14

13-Feb-14

27-Jan-14

22-Jan-14

13-Feb-14

26-Aug-13
15-Jan-14

26-Aug-13
20-Jan-14

24-Sep-13
7-Feb-14

25-Sep-13

24-Dec-13

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-May-14

23-Jun-14

8-Jul-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-May-14

23-Jun-14

8-Jul-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

8-Feb-14

15-May-14

5-Jul-14

21-Jul-14

15-May-14

5-Jul-14

21-Jul-14

15-May-14

5-Jul-14

21-Jul-14

15-May-14

23-Jun-14

8-Jul-14

NTP
LNTP

15-Jan-14

20-Jan-14

15-Mar-14

NTPLNTP

27-Sep-13
31-May-14

25-Sep-13

19-Feb-14

20-Jan-14

15-Mar-14

F
F

A
I
I
A

4 (i)

COMP_S

6 (ii)
6 (ii)
1 (i)

LNTP
LNTP
LNTP
LNTP
LNTP

NTP

I
A

NTP
2 (i)

NTPLNTP

B
B
B
C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT
9-Apr-14

21-Jul-14

24-Feb-14

3-Mar-14

24-Feb-14

3-Mar-14

10-Oct-13
15-Mar-14

4-Nov-13
2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

15-Mar-14

2-Apr-14

5-Jul-14

21-Jul-14

5-Jul-14

21-Jul-14

F
A
B

NTP
NTPLNTP

LNTP

NTPLNTP

NTPLNTP
NTP

NTP
LNTP

A
I

NTPLNTP

LNTP

A
A

NTPLNTP

NTPLNTP
NTP
NTP

A
2 (i)

NTP
NTP

23-Jun-14

8-Jul-14

23-Jun-14

8-Jul-14

23-Jun-14

8-Jul-14

15-May-14
27-Sep-13

15-May-14
15-Jan-14

B
B
B

F
F
E

15-May-14

15-May-14
C

B
B

F
F

NTP

C
B

C
E

C
B
A
B
C

LNTP
LNTP

31-May-14
15-Jan-14
15-Jan-14
31-May-14

20-Jan-14
20-Jan-14

15-Mar-14
15-Mar-14

NTP
LNTP

15-Jan-14

20-Jan-14

15-Mar-14

NTP

AFTER TEST
31-May-14

15-Jan-14
31-May-14
15-Jan-14
15-Jan-14
31-May-14

20-Jan-14

15-Mar-14

20-Jan-14
20-Jan-14

15-Mar-14
15-Mar-14

F
F

15-Jan-14

20-Jan-14

15-Mar-14

27-Sep-13

25-Sep-13

19-Feb-14

31-May-14

5-Jul-14

21-Jul-14

31-May-14

5-Jul-14

21-Jul-14

15-Jan-14

20-Jan-14

15-Mar-14

15-Jan-14

20-Jan-14

15-Mar-14

31-May-14

5-Jul-14

21-Jul-14

NTP
NTP

31-May-14
31-May-14
31-May-14

LNTP
NTP
LNTP
LNTP

LNTP
2 (i)

NTPLNTP
NTP

NTPLNTP
LNTP

A
B

AFTER TEST

10 OF 276

F
F

31-May-14

15-Jan-14
AFTER TEST

31-May-14
NTP
LNTP

8-Jul-14

26-Jan-16

31-May-14

23-Jun-14

15-May-14

21-Jul-14

15-May-14

3-Jun-14

NTP

Quality Plan for ESP TRFR

R2SUB_A_DT R2APP_A_DT R2APP


CAT

B
E
F
E
A

F
F

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept
707

HWR

MDL

Err:512

708

HWR

HXE

BTG-LC-DWG-M-0183

HWR-1810-MDL-001

MASTER DRAWING LIST-HWR


CONDENSER ASSEMBLY - GA

709

HWR

HXE

BTG-LC-DWG-M-0184

COND. PERFORMANCE CURVE

710

HWR

HXE

BTG-LC-DSH-M-0185

CONDENSER DATA SHEET

711

HWR

HXE

BTG-UMC-DWG-S-0052

EMBEDMENT DETAILS IN CONDENSER PEDESTAL

712

HWR

HXE

BTG-XXX-DWG-I-0057

CONDENSER - INSTALLATION OF LEVEL INSTRUMENTS

713
714
715

HWR
HWR
HWR

HXE
HXE
HXE

BTG-LC-DWG-M-0186
BTG-LC-DSH-M-0187
BTG-LCC-DWG-M-0188

GA OF GLAND STEAM CONDENSER


GSC DATA SHEET
LPH-1 GA

716

HWR

HXE

BTG-LCC-DSH-M-0189

LPH-1 DATA SHEET

717

HWR

HXE

BTG-MAJ-DWG-M-0190

VACUUM PUMP PACKAGE-GA

718

HWR

HXE

BTG-XXX-DWG-M-0191

H2 COOLER - GA

719

HWR

HXE

BTG-XXX-DSH-M-0192

H2 COOLER - DATA SHEET

720

HWR

HXE

BTG-XXX-DWG-M-0193

EXCITER AIR COOLER -GA

721

HWR

HXE

BTG-XKC-DSH-E-0208

EXCITER AIR COOLER DATA SHEET

722

HWR

HXE

BTG-MAJ-DWG-M-0451

P & ID OF VACUUM PUMP

723

HWR

HXE

BTG-LC-MNL-M-0194

O&M MANUAL-CONDENSER

724

HWR

HXE

BTG-XXX-CAL-M-0195

Condenser Thermal & Hydraulic Calculations

725

HWR

HXE

BTG-XXX-DWG-M-0196

TOC GA Drawing of Turbine Oil Cooler

726

HWR

HXE

BTG-XXX-DSH-M-0197

Datasheet of Turbine Oil Cooler

727

HWR

EME

BTG-MKA-DWG-E-0209

GENERATOR OUTLINE

728

HWR

EME

BTG-XKC-DWG-E-0500

EXCITER OUTLINE (GA DRAWING)

729

HWR

EME

BTG-UMC-DWG-S-0053

FOUNDATION DETAILS FOR GENERATOR AUXILIARY EQUIP.

730

HWR

EME

BTG-UMC-DWG-S-0054

EXCITER OUTLINE -FOUNDATION DETAILS

731

HWR

EME

BTG-MKA-DWG-E-0210

LAYDOWN SPACE FOR GENERATOR COMPONENTS

732

HWR

EME

BTG-MKA-DWG-I-0058

GENERATOR INSTRUMENTATION SCHEME

733

HWR

EME

BTG-MKC-DWG-I-0059

EXCITER INSTRUMENTATION SCHEME

734

HWR

EME

BTG-XXX-DWG-M-0198

GENERATOR GAS SYSTEM SCHEME

735

HWR

EME

BTG-XXX-DWG-M-0199

GENERATOR SEAL OIL SYSTEM SCHEME

736

HWR

EME

BTG-XXX-DWG-M-0200

PRIMARY WATER SYSTEM SCHEME

737

HWR

EME

BTG-XXX-DWG-M-0201

GENERATOR WASTE FLUID SYSTEM SCHEME

738

HWR

EME

BTG-XXX-DWG-M-0202

GENERATOR WASTE GAS SYSTEM SCHEME

739

HWR

EME

BTG-MKA-DSH-E-0211

GENERATOR -DATA SHEET &CURVES

740

HWR

EME

BTG-XXX-DWG-M-0203

GENERATOR PIPING PLANS

741

HWR

EME

BTG-XXX-DWG-M-0204

COOLING WATER PIPING TO H2 COOLER

742

HWR

EME

BTG-MKA-DWG-E-0212

ERECTION DRGs- GENERATOR

743

HWR

EME

BTG-MKA-MNL-E-0213

O&M MANUAL - GENERATOR

744

HWR

EME

BTG-XXX-DWG-M-0205

GA Drawing of Seal Oil Cooler

745

HWR

EME

BTG-XXX-DSH-M-0206

Datasheet of Seal Oil Cooler

746
747

HWR
HWR

STE
STE

BTG-MA-DWG-M-0209
BTG-MAP-DWG-M-0210

STEAM TURBINE GA DRG


LP Bypass Valve- Drawing

748

HWR

STE

BTG-XXX-DWG-M-0211

BASE PLATE ASSEMBLY

749

HWR

STE

BTG-XXX-DWG-M-0212

Arrangement of Embedment for Anchor Points

750

HWR

STE

BTG-XXX-PCD-S-0055

FOUNDATION DESIGN WRITE UP

751

HWR

STE

BTG-XXX-DWG-M-0213

ERECTION DRGs- STEAM TURBINE

752

HWR

STE

Err:512

O & M MANUAL STEAM TURBINE

753

HWR

STE

BTG-XXX-DWG-M-0214

GA Drawing of HPSU Cooler

754

HWR

STE

BTG-XXX-DWG-M-0215

Turbine Start up Curves

755
756

HWR
HWR

PED
PED

BTG-XXX-DWG-M-0216
BTG-XXX-DSH-S-0056

LPBP VALVE ARRANGEMENT


FOUNDATION LOADS, SHEET 1

757

HWR

PED

BTG-XXX-DSH-S-0057

FOUNDATION LOADS, SHEET 2

758

HWR

PED

BTG-XXX-DWG-S-0058

FOUNDATION PLAN, SHEET 1 - TOP VIEW SECTION A-A

759

HWR

PED

BTG-XXX-DWG-S-0059

FOUNDATION PLAN, SHEET 2 - SECTIONS

760

HWR

PED

BTG-XXX-DWG-S-0060

FOUNDATION PLAN, SHEET 3 - OVERVIEW GROUT TOPPING

761

HWR

PED

BTG-XXX-DWG-M-0217

STORAGE SPACE (LAYDOWN SPACE FOR ST COMPONENTS)

762

HWR

PED

BTG-XXX-DWG-S-0061

FOUNDATION PLAN (SUPP)

763

HWR

PED

BTG-XXX-DWG-S-0062

FOUNDATION PLAN (SUPP)

A
A

2 (vii)

LNTP
LNTP
LNTP
LNTP

LNTP

I
I
I
I

LNTP
4 (ii)
4 (ii)

LNTP
LNTP
LNTP

LNTP

LNTP
NTP
NTP
NTP
NTP
NTP
NTP

I
I
I
I

LNTP
After order placement
After order placement
2 (vii)
2 (vii)
3 (v)
3 (v)
4 (ii)

LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
After order placement
After order placement

2 (vii)
2 (vii)

LNTP
LNTP

LNTP

LNTP

4 (i)

I
I
I
I
I
I
I
I
I

LNTP
NTP
NTP
After order placement

LNTP
2 (vii)
3 (v)
3 (v)
3 (v)
3 (v)
3 (v)
4 (ii)

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

for ESV, IV & OLV

1 (i)

COMP_S

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

26-Aug-13

26-Aug-13

24-Sep-13

26-Sep-13

20-Sep-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Nov-13

21-Nov-13

9-Jan-14

26-Nov-13
26-Nov-13
26-Nov-13

21-Nov-13
21-Nov-13
21-Nov-13

27-Jan-14
27-Jan-14
15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

25-Nov-13

11-Feb-14

26-Apr-14

20-May-14

21-Jul-14

26-Apr-14

20-May-14

21-Jul-14

26-Apr-14

20-May-14

21-Jul-14

26-Apr-14

20-May-14

21-Jul-14

21-Nov-13

11-Feb-14

26-Sep-13

20-Sep-13

15-Jan-14

26-Sep-13

20-Sep-13

9-Jun-14

26-Oct-13

24-Oct-13

9-Jun-14

26-Oct-13

24-Oct-13

1-Nov-13

26-Nov-13

21-Nov-13

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-Apr-14

21-Apr-14

23-May-14

26-May-14

3-Jun-14

4-Jul-14

26-Sep-13
26-Sep-13

25-Sep-13
25-Sep-13

8-Jan-14
1-Nov-13

26-Oct-13

24-Oct-13

1-Nov-13

26-Oct-13

24-Oct-13

1-Nov-13

26-Nov-13

21-Nov-13

19-Dec-13

30-Nov-13

21-Nov-13

5-Feb-14

26-Sep-13
26-Oct-13

25-Sep-13
24-Oct-13

4-Jul-14
8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Nov-13

21-Nov-13

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

FAPP
CAT
C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT
10-Oct-13

4-Nov-13

21-Mar-14

10-Apr-14

7-Dec-13

11-Feb-14

7-Dec-13

18-Jul-14

R3APP_A_DT

R3APP CAT

20-May-14

26-May-14

23-Jun-14

E
C
C
F
B
B
F
F

E
F

20-May-14
3-Jun-14
3-Jun-14
23-Jun-14

18-Jul-14
18-Jul-14

F
F

23-Jun-14

B
F
F
F
F

26-Mar-16
B

21-Mar-14

10-Apr-14

21-Mar-14

3-Apr-14

After order Placement


After order Placement
E
E
E
E

B
B
B
B
B
B
B
B

26-Sep-14
26-Sep-14
26-Mar-16
26-Mar-16
After order Placement
After order Placement
B
E
E
E
F

26-Mar-16
26-Mar-16
After order Placement

11 OF 276

R3SUB_A_DT

26-Sep-14

26-Nov-13

R2SUB_A_DT R2APP_A_DT R2APP


CAT

B
B
F
F
F
F
F

F
F

23-Jun-14
16-Jul-14
16-Jul-14
16-Jul-14
16-Jul-14
16-Jul-14

16-Jul-14
16-Jul-14

21-Mar-14

10-Apr-14

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
764

HWR

PED

BTG-XXX-DWG-S-002

FOUNDATION PLAN (SUPP)

765

HWR

PED

BTG-XXX-LIST-M-0220

LIST OF EMBEDDED PARTS

766

HWR

PED

BTG-XXX-DSH-S-0064

FOUNDATION DETAILS OF HPSU FOR ESV, IV AND OV VALVES

767

HWR

PED

BTG-UMC-DSH-S-0065

FOUNDATION DETAILS OF HPSU FOR IPBV

768

HWR

PED

BTG-UMA-DSH-S-0066

REQUIREMENT OF BEAM BELOW TG DECK

769

HWR

PED

BTG-XXX-DSH-M-0221

OIL CANAL DETAILS

770

HWR

PED

BTG-XXX-DWG-M-0222

OIL ROOM ARRANGEMENT

771

HWR

PED

BTG-XXX-DSH-M-0223

SPACE REQUIRED FOR CONDENSATE WATER SPRAY


STATION FOR IPBV

772

HWR

PED

BTG-UMA-DWG-S-0067

PLATFORM BELOW TG DECK

773

HWR

PED

BTG-XXX-DWG-M-0224

GENERAL ARRANGEMENT WASTE OIL TANK

774

HWR

PED

BTG-XXX-DWG-M-0225

GENERAL ARRANGEMENT LEAKAGE/DIRTY OIL TANK

775

HWR

PED

BTG-XXX-DWG-S-0107

PIT & EMBEDDED PLATE FOR TURBINE DRAINAGE PIPING

776

HWR

PED

BTG-UMC-DWG-S-0108

ASSEMBLY PLATFORM FOR OV BELOW TG DECK

777
778

HWR
HWR

PED
PED

BTG-XXX-DWG-M-0226
BTG-XXX-DWG-M-0227

LNTP
Purpose reference
(I/ A)
I

I
I

LNTP
LNTP
LNTP

4 (ii)
4 (ii)

LNTP
LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

SUSPENSION OF LP BYEPASS VALVE


GRAPHICAL SYBBOLS FOR PIPING , VALVES AND
INSTRUMENTATION (LEGEND)

I
I

LNTP

PED

BTG-XXX-DSH-M-0228

SEAL STEAM SYSTEM

HWR

PED

BTG-XXX-DSH-M-0229

SPINDLE LEAK-OFF STEAM SYSTEM

781

HWR

PED

BTG-XXX-DWG-M-0230

TURBINE DRAINAGE SYSTEM SCHEME

782

HWR

PED

BTG-MAN-DSH-M-0231

IP-BYPASS STEAM SYSTEM

783

HWR

PED

BTG-XXX-DSH-M-0232

HP-IP-LP TURBINE SYSTEM

784

HWR

PED

BTG-MAX-DSH-I-0060

CONTROL FLUID SYSTEM

785

HWR

PED

BTG-MAN-DSH-M-0233

CONTROL FLUID (BYPASS) SYSTEM

786

HWR

PED

BTG-XXX-DSH-M-0234

OIL MODULE 2 SYSTEM

787

HWR

PED

BTG-XXX-DSH-M-0235

OIL VAPOUR EXHAUST SYSTEM

788

HWR

PED

BTG-XXX-DSH-M-0236

LIFTING OIL SYSTEM

789

HWR

PED

LIFTING OIL SYSTEM

790

HWR

PED

BTG-XXX-DSH-M-0238

PRESSURE OIL / RETURN FLOW SYSTEM

791

HWR

PED

BTG-QSV-DWG-M-0239

CW SCHEME - LUB OIL COOLERS

792

HWR

PED

BTG-XXX-DWG-M-0240

COOLING WATER SCHEME - CONTROL FLUID COOLERS

793

HWR

PED

BTG-QSV-DWG-M-0241

LUBE OIL SYSTEM SCHEME(LEAKAGE/ WASTE OIL)

794

HWR

PED

BTG-XXX-DSH-M-0242

VALVE DETAILS ( TURBINE INTEGRAL SYS) )

795

HWR

PED

BTG-QSV-DWG-M-0243

LUB OIL COOLING WATER PIPING LAYOUTS

796

HWR

PED

BTG-QSV-DWG-M-0244

LUB OIL PIPING LAYOUTS

797

HWR

PED

BTG-XXX-DWG-M-0245

SEAL STEAM PIPING LAYOUTS

798

HWR

PED

BTG-XXX-DWG-M-0246

TURBINE DRAINAGE PIPING LAYOUTS

799

HWR

PED

BTG-XXX-DWG-M-0247

CONDENSATE SPRAY PIPING LAYOUTS

800

HWR

PED

BTG-XXX-DWG-M-0248

CF PIPING LAYOUTS (ESV, IV, OLV)

801

HWR

PED

BTG-XXX-DWG-M-0249

CONTROL FLUID PIPING (IPBP) LAYOUTS

802

HWR

PED

BTG-XXX-DWG-M-0250

COOLING WATER PIPING (CF COOLER) LAYOUTS

803

HWR

PED

BTG-XXX-DWG-M-0251

OVERLOAD PIPING LAYOUTS

804

HWR

CIE

BTG-XXX-LIST-E-0214

418000C5020

List of Junction boxes

805

HWR

CIE

BTG-XXX-LIST-I-0061

418000C5002

List of Annunciations

806

HWR

CIE

BTG-XXX-DWG-I-0062

ATRS Logics Evacuation

807

HWR

CIE

BTG-XXX-DWG-I-0167

FUNCTIONAL DIAGRAM FOR TURBINE CONTROLS

808

HWR

CIE

BTG-MKY-DWG-E-0215

FUNCTIONAL DIAGRAM FOR GENERATOR CONTROLS

809

HWR

CIE

BTG-MKA-LIST-E-0501

810

HWR

CIE

BTG-XXX-DWG-I-002

811

HWR

CIE

BTG-XXX-PCD-I-0064

418000C5413

W/UP ON KKS CLASSIFICATION SYSTEM

812
813
814
815

HWR
HWR
HWR
HWR

CIE
CIE
CIE
CIE

BTG-XXX-DWG-I-0065
BTG-XXX-DWG-I-0066
BTG-XXX-DWG-I-0067
BTG-XXX-DWG-I-0147

418000C5278
418000C5279
418000C5277
418000C5275

DC EOP STARTER PANEL SCHEME


DC SOP STARTER PANEL SCHEME
DC JOP STARTER PANEL SCHEME
GAS ANALYSER SCHEME

816

HWR

CIE

BTG-XXX-PCD-I-0068

418000C5274

System Description of TG C&I

817
818

HWR
HWR

CIE
CIE

BTG-XXX-DWG-I-0069
BTG-XXX-LIST-I-0070

418000C5153
418000C5011

FEEDER TYPES (RECOMMENDED)


MEASURING POINT LIST (GEN. INSTRUMENT LIST)

819

HWR

CIE

BTG-XXX-LIST-I-0071

418000C5020

INSTRUMENTS LIST (ST)

820

HWR

CIE

BTG-XXX-DWG-E-0216

418000C5276

OGA FOR TURBINE- GENERATOR AUXILIARY CONTROL


CABINETS

Control system Configuration Drg

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13
26-Apr-14

21-Nov-13
21-Apr-14

4-Jul-14
3-Jun-14

NTP

HWR

LIST OF FEEDER LOADS

26-Nov-13

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

NTP
NTP

LNTP
LNTP

LNTP
LNTP

22-Jul-14

E
23-Jun-14

23-Jul-14

23-Jun-14

22/7/14

23-Jun-14

22/7/14

20-May-14

26-May-14

26-Mar-14
26-Mar-14
26-Mar-14

26-Apr-14
26-Apr-14
26-Apr-14

B
B
B

20-May-14

21-Jul-14

23-Jun-14

21-Jul-14

23-Jun-14

21-Jul-14

F
F
F
F
B

E
E

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

21-Jul-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

21-Jul-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

3-Jun-14

26-Apr-14

21-Apr-14

21-Jul-14

26-Apr-14

21-Apr-14

3-Jun-14

B
B
B
B
C
B
B
B
B
B
B
B
B
B
B

10-Jun-14
10-Jun-14
10-Jun-14

26-Feb-14

21-Apr-14

26-Apr-14

21-Apr-14

26-Apr-14

2 mnths before commissioning

LNTP

23-Jun-14

26-Apr-14

2 mnths before commissioning

26-Apr-14

After order placement

LNTP

23-Jun-14

26-Sep-14

NTP

LNTP

26-Sep-14

NTP

22-Jul-14

26-Sep-14

NTP

LNTP

23-Jun-14

26-Sep-14

NTP

4 (i)

22-Jul-14

26-Sep-14

NTP

23-Jun-14

26-Sep-14

NTP

LNTP
LNTP
LNTP

22-Jul-14

26-Sep-14

NTP

LNTP

23-Jun-14

26-Sep-14

NTP

16-Jul-14

26-Sep-14

NTP

A
A
A

16-Jul-14

26-May-14

NTP

3 (iv)

R1SUB_A_DT R1APP_A_DT R1APP


CAT

NTP

FAPP
CAT

LNTP

780

418000C5151

4 (ii)

779

BTG-XXX-DSH-M-0237

LNTP
4 (ii)

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks
LNTP

I
I

COMP_S

4-Jul-14
4-Jul-14
4-Jul-14

26-Sep-13

20-Sep-13

26-Oct-13

24-Oct-13

26-Oct-13

24-Oct-13

9-Jan-14

26-Oct-13
26-Oct-13
26-Oct-13
26-Oct-13

24-Oct-13
24-Oct-13
24-Oct-13
24-Oct-13

27-Nov-13
27-Nov-13
27-Nov-13
27-Dec-13

26-Nov-13

21-Nov-13

3-Jan-14

26-Dec-13
26-Dec-13

19-Dec-13
19-Dec-13

24-Jan-14
13-Feb-14

26-Dec-13

19-Dec-13

13-Feb-14

26-Dec-13

19-Dec-13

24-Jan-14

12 OF 276

26-Apr-14

E
C
C
C
E
F

B
B
C
B

C
C

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
821

HWR

CIE

BTG-XXX-DWG-E-0217

418000C5222

CABLING DIAGRAM- ST

822

HWR

CIE

BTG-XXX-PCD-I-0168

418000C5417

W/UP ON GENERATOR C&I

823

HWR

CIE

BTG-XXX-DWG-I-0072

418000C5420

W/UP ON PW & COLD GAS TEMP CONTROL

824

HWR

CIE

BTG-XXX-PCD-I-0148

418000C5426

WRITE UP ON AUTOMATIC TURBINE TESTER

825

HWR

CIE

BTG-XXX-PCD-I-0073

418000C5408

WRITE UP ON TURBINE SUPERVISORY INSTRUMENTATION


SYSTEM

LNTP
Purpose reference
(I/ A)
I

COMP_S
Remarks
LNTP

LNTP

LNTP

LNTP

26-Dec-13

19-Dec-13

24-Jan-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

LNTP

HWR

CIE

BTG-XXX-PCD-I-0149

418000C5427

WRITE UP ON TURBINE STRESS CONTROLLER

827

HWR

CIE

BTG-XXX-PCD-I-0150

418000C5401

WRITE-UP ON TURBINE PROTECTION SYSTEM

828

HWR

CIE

BTG-XXX-PCD-I-0074

418000C5421

WRITE-UP ON ATRS

829

HWR

CIE

BTG-XXX-PCD-I-0075

418000C5422

WRITE UP ON ELECTRO-HYDRAULIC CONTROLLER

830

HWR

CIE

BTG-XXX-PCD-I-0076

418000C5407

W -UP ON GLAND SEAL STEAM PRESSURE CONTROL

831

HWR

CIE

BTG-XXX-DWG-E-0218

418000C5021

MESAURING PTS ON TURBINE & GENERATOR BRGS

832

HWR

CIE

BTG-XXX-DWG-I-0078

418000C5022

TURBINE VALVES SENSOR ARRGMNT

833

HWR

CIE

BTG-XXX-DWG-I-0151

418000C5023

EXPANSION, VIBRATION & VALVE POSITION MEASUREMENT

834

HWR

CIE

BTG-XXX-DWG-I-0079

418000C5261

SGC-HPSU (LP BYPASS) LOGIC

835

HWR

CIE

BTG-XXX-DWG-I-0080

418000C5112

TURBINE TRIP SYSTEM LOGICS

836

HWR

CIE

BTG-XXX-PCD-I-0081

418000C5115

W/UP & LOGIC FOR EHA TYPE LP BYPASS TRIP SYSTEM

837

HWR

CIE

BTG-XXX-PCD-I-0082

418000C5440

W-UP EHA LP BYPASS CONTROL SYSTEM

838

HWR

CIE

BTG-XXX-DSH-I-0083

418000C5441

WATER INJECTION CONTROLLER -EHA LP BYPASS SYSTEM

839

HWR

CIE

BTG-XXX-DWG-I-0084

ARRANGEMENT OF I & C CABINETS FOR TURBINE CONTROL

840

HWR

CIE

BTG-XXX-DSH-I-0085

EMERGENCY PUSH BUTTONS CONCEPT

841

HWR

CIE

BTG-XXX-LIST-I-0086

SIGNAL EXCHANGE LIST

842

HWR

CIE

BTG-XXX-DSH-I-0087

Erection drgs- C&I

843

HWR

CIE

BTG-XXX-SCH-E-0219

Cable schedule

844

EDN

MDL

Err:512

EN-DG-1050-145-0001

MASTER DRAWING LIST-EDN

845

EDN

C&I-DAVR

BTG-XXX-DWG-I-0152

EN-DG-1050-145-1001

OGA DRAWING

846

EDN

C&I-DAVR

BTG-XXX-DWG-I-0089

EN-DG-1050-145-1002

AVR SCHEME

847

EDN

C&I-DAVR

BTG-XXX-DSH-I-0090

EN-DG-1050-145-1003

TEST PROTOCOL

848

EDN

C&I-DAVR

Err:512

EN-DG-1050-145-1004

QUALITY PLAN

849

EDN

C&I-DAVR

BTG-XXX-MNL-I-0091

EN-DG-1050-145-1005

O &M MANUALS FOR AVR

850

EDN

C&I-SG

BTG-XXX-PCD-I-0092

EN-DG-1050-145-2001

WRITE UP ON SG C&I PACKAGE - EDN's Scope

851

EDN

C&I-SG

Err:512

EN-DG-1050-145-2002

O & M MANUAL FOR SG C&I PACKAGE - EDN's Scope

852

EDN

C&I-SG

BTG-CWA-DWG-I-0093

EN-DG-1050-145-2003

Console OGA

853

EDN

C&I-SG

BTG-XXX-SCH-E-0220

EN-DG-1050-145-2004

CABLE SCHEDULE-SG

854

EDN

C&I-TG

BTG-XXX-PCD-I-0094

EN-DG-1050-145-3001

WRITE UP ON TG C&I PACKAGE - EDN's Scope

855

EDN

C&I-TG

Err:512

EN-DG-1050-145-3002

O & M MANUAL FOR TG C&I PACKAGE - EDN's Scope

856

EDN

C&I-TG

BTG-XXX-SCH-E-0221

EN-DG-1050-145-3003

CABLE SCHEDULE-TG

857

EDN

C&I-HMI

BTG-XXX-DSH-I-0095

EN-DG-1050-145-4002

HMI SYSTEM DESCRIPTION

NTP

30-Dec-14

A
A

NTP

19-Dec-13
30-Dec-15

EDN
EDN

C&I-HMI
C&I-HMI

BTG-XXX-DSH-I-0096
BTG-XXX-DSH-I-0097

EN-DG-1050-145-4003
EN-DG-1050-145-4004

HMI - BILL OF MATERIAL


DATA SHEET, BOM FOR LARGE VIDEO SCREEN

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-May-14

21-Apr-14

26-May-14

21-Apr-14

26-May-14

21-Apr-14

26-May-14

27-May-14

22-Jul-14

26-May-14

27-May-14

22-Jul-14

26-May-14

27-May-14

22-Jul-14

26-May-14

27-May-14

21-Jul-14

26-Jul-14

27-May-14

22-Jul-14

27-May-14

22-Jul-14

26-Aug-13

26-Aug-13

24-Sep-13

12-May-14

30-May-14

20-Jun-14

12-May-14

30-May-14

20-Jun-14

12-May-14

30-May-14

20-Jun-14

30-Mar-15
20-Sep-13

31-Dec-13

21-Nov-13

27-Nov-13

25-Sep-13

6-Nov-13

19-Dec-13

15-Jan-14

25-Oct-13

31-Oct-13

13-Sep-13

12-Dec-13

LNTP

LNTP

LNTP

LNTP

LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

1 (i)

2 mnths before
commissioning

LNTP
NTP

NTP

NTP

F
F

2-Apr-14

15-Apr-14

21-Jul-14

15-Apr-14

21-Jul-14

F
F
F
F

F
F

23-Jun-14
15-Apr-14

21-Jul-14
F

23-Jun-14
15-Apr-14

22-Jul-14

23-Jun-14
23-Jun-14
15-Apr-14

21-Jul-14

10-Oct-13

4-Nov-13

8-Jan-14

15-Jan-14

13-Feb-14

27-Feb-14

19-Nov-13

27-Dec-13

F
F
F
F
F

24-May-14

NTP

26-Mar-14

R2SUB_A_DT R2APP_A_DT R2APP


CAT

After order Placement

NTP NTP

NTP

26-Mar-16

2 mnths before
commissioning

NTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

26-Mar-16

NTP

NTPLNTP

FAPP
CAT

826

858
859

2X660 MW IB VALLEY TPS


FAPP_A_DT

LNTP
NTP NTP
NTP

27-Sep-13

B
B

30-Jun-16
15-Dec-13

30-Jun-16
27-Sep-13

30-Jun-16
30-Jun-16

30-May-14

NTP
860

EDN

C&I-HMI

BTG-XXX-DSH-E-0222

EN-DG-1050-145-4005

DATA SHEET,DRG T FOR FIBRE OPTIC CABLE

861

EDN

C&I-HMI

BTG-CWA-DWG-I-0098

EN-DG-1050-145-4006

OPERATOR DESK & FURNITURE - OVERALL GENERAL


ARRANGEMENT

30-Dec-15
NTP

30-Dec-14

NTP

862

EDN

C&I-HMI

BTG-CWA-DSH-I-0099

EN-DG-1050-145-4007

DATA SHEET FOR OPERATOR DESK

863

EDN

C&I-HMI

BTG-XXX-DSH-I-0153

EN-DG-1050-145-4008

DATA SHEET FOR FURNITURE

1-Nov-15

864

EDN

C&I-HMI

Err:512

EN-DG-1050-145-4009

O &M MANUALS FOR HMI

30-Jun-15

865

EDN

C&I-BOP

BTG-XXX-DWG-I-0100

EN-DG-1050-145-5001

CONTROL SYSTEM CONFIGURATION DRAWING

866

EDN

C&I-BOP

BTG-XXX-DSH-I-0154

EN-DG-1050-145-5001

FUNCTION GROUPING DOCUMENT -SG,TG,BOP

867

EDN

C&I-BOP

Err:512

EN-DG-1050-145-5002

QUALITY PLAN-SG,TG,BOP

868

EDN

C&I-BOP

BTG-BAU-DWG-E-0223

EN-DG-1050-145-5003

EARTHING SCHEME

869

EDN

C&I-BOP

BTG-XXX-DSH-E-0224

EN-DG-1050-145-5004

TEST PROTOCOL-SG,TG,BOP&HMI

870

EDN

C&I-BOP

BTG-XXX-DSH-E-0225

EN-DG-1050-145-5005

SYSTEM DESIGN PHILOSOPHY-SG,TG,BOP

871

EDN

C&I-BOP

BTG-XXX-DWG-E-0226

EN-DG-1050-145-5006

OGA OF SG/TG/BOP/HMI

872

EDN

C&I-BOP

BTG-XXX-MNL-E-0227

EN-DG-1050-145-5007

O&M MANUALS BOP PACKAGE

873

EDN

C&I-BOP

BTG-XXX-SCH-E-0228

EN-DG-1050-145-5008

CABLE SCHEDULE-BOP

874

EDN

C&I-BOP

BTG-CWA-DWG-I-0101

EN-DG-1050-145-5010

OGA OF UNIT CONTROL PANEL

875

EDN

C&I-BOP

BTG-XXX-DWG-E-0229

EN-DG-1050-145-5011

ELECTRICAL SCHEMATIC DIAGRAM OF UCP

A
A
A

1-Nov-15

NTP

3 (iv)

LNTP
NTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

27-Oct-13

25-Feb-15
27-Sep-13
20-Jul-15
30-Jun-15
12-Jan-15
25-Feb-15
30-Jun-16
30-Jun-16
30-Apr-15
30-Jun-15

13 OF 276

20-Jan-14

7-Mar-14

12-Mar-14

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

876

EDN

C&I-BOP

BTG-XXX-DWG-I-0102

EN-DG-1050-145-5012

OGA OF ELECTRICAL CONTROL PANEL

877

EDN

C&I-BOP

BTG-XXX-DWG-I-0103

EN-DG-1050-145-5013

SCHEMATIC DIAGRAM OF ELECTRICAL CONTROL PANEL

878

EDN

C&I-BOP

BTG-XXX-DWG-E-0230

EN-DG-1050-145-5014

SCHEMATIC DIAGRAM OF TRANSDUCER & AVT PANEL

879

EDN

C&I-BOP

BTG-XXX-MNL-E-0231

EN-DG-1050-145-5015

O &M MANUALS FOR ECP,UCP & T&AVT PANEL

880

EDN

C&I-BOP PR
MECH

BTG-XXX-DWG-I-0104

EN-DG-1050-145-6001

INSTALLATION SCHEMES FOR INSTRUMENTS

881

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0105

EN-DG-1050-145-6002

DATA SHEET & DRG FOR AIR FILTER REGULATOR

882

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0106

EN-DG-1050-145-6003

DATA SHEET & DRG FOR E/P CONVERTER

883

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0107

EN-DG-1050-145-6004

QUALITY CHECKLIST FOR E/P CONVERTER

884

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0108

EN-DG-1050-145-6005

DATA SHEET & DRG FOR LEVEL SWITCH

885

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-E-0232

EN-DG-1050-145-6006

QUALITY CHECKLIST FOR LEVEL SWITCH

886

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0109

EN-DG-1050-145-6007

DATA SHEET, DRG FOR TEMP. ELEMENTS ( T/C's & RTD's) with
THERMOWELLS

FSUB_S_DT

NTP
NTP
NTP NTP
NTP NTP
NTP
NTP
NTP
NTP

30-Apr-15
30-Jun-15
30-Jun-15
30-Mar-16
30-Apr-15
30-Apr-15
30-Apr-15
30-Apr-15
30-Apr-15
30-Apr-15

NTP

20-Jun-15

NTP

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6008

QUALITY PLAN FOR TEMP ELEMENTS

888

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0110

EN-DG-1050-145-6009

DATA SHEET FOR PRESSURE GAUGES

889

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0111

EN-DG-1050-145-6010

QUALITY CHECK LIST FOR PRESSURE GAUGES

890

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0112

EN-DG-1050-145-6011

DATA SHEET FOR TEMPERATURE GAUGES

891

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0113

EN-DG-1050-145-6012

QUALITY CHECK LIST FOR TEMPERATURE GAUGES

892

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0114

EN-DG-1050-145-6013

DATA SHEET FOR PRESSURE SWITCHES

893

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-E-0233

EN-DG-1050-145-6014

QUALITY CHECK LIST FOR PRESSURE SWITCHES

894

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0115

EN-DG-1050-145-6015

DATA SHEET FOR FLUE GAS ANALYSER (SO2/NOx/CO2/CO )

895

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0116

EN-DG-1050-145-6016

DATA SHEET FOR OXYGEN ANALYSER

896

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0117

EN-DG-1050-145-6017

DATA SHEET FOR DUST (OPACITY) ANALYSER

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0118

EDN

COMP_A

NTP

887

897

COMP_S
Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

20-Jun-15
10-May-15
10-May-15
10-May-15
10-May-15
30-Jul-15
30-Jul-15
30-Dec-15
20-Oct-15

NTP

EN-DG-1050-145-6018

DATA SHEET/DRGS., BOM FOR STEAM AND WATER SYSTEM (


SWAS )

30-Dec-15
NTP

30-Dec-15

NTP
898

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6019

QUALITY PLAN FOR SWAS SYSTEM

899

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0119

EN-DG-1050-145-6020

DATA SHEET,DRG, BOM FOR VIBRATION MONITORING


SYSTEM ( VMS )

900

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6021

QUALITY PLAN FOR VIBRATION MONITORING SYSTEM

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0120

30-Dec-15
NTP

30-Dec-15

NTP

901

EDN

EN-DG-1050-145-6022

DATA SHEET/DRG, BOM FOR COAL BUNKER LEVEL


MONITORING SYSTEM

30-Dec-15
NTP

30-Dec-15

NTP

902

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0155

EN-DG-1050-145-6023

QUALITY CHECK LIST FOR COAL BUNKER LVL MONITORING


SYSTEM

903

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0156

EN-DG-1050-145-6024

BOQ FOR IMPULSE PIPES & SAMPLE PIPES

904

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0157

EN-DG-1050-145-6025

QUALITY CHECK LIST FOR IMPULSE PIPES

905

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0158

EN-DG-1050-145-6026

BOQ FOR CONDENSATE POTS

906

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0159

EN-DG-1050-145-6027

QUALITY CHECK LIST FOR CONDENSATE POTS

907

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0160

EN-DG-1050-145-6028

BOQ FOR VALVE MANIFOLDS

908

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0161

EN-DG-1050-145-6029

QUALITY CHECK LIST FOR VALVE MANIFOLDS

909

EDN

C&I-BOP PR
MECH

BTG-XXX-DWG-I-0121

EN-DG-1050-145-6030

GA, LAYOUT & WIRING DRGS. FOR LOCAL INSTRUMENT


ENCLOSURES & RACKS( LIE / LIR )

NTP
NTP
NTP
NTP
NTP

30-Dec-15
30-Apr-15
30-Apr-15
30-Apr-15
30-Apr-15
30-Apr-15

NTP
30-Apr-15
NTP

10-Aug-15

NTP

910

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6031

QUALITY PLAN FOR LIE/LIR

911

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0162

EN-DG-1050-145-6032

BOQ FOR SOCKET WELD FITTING

10-Aug-15
NTP
30-Apr-15
NTP

912

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0122

EN-DG-1050-145-6033

DATA SHEET/CATALOGUE FOR LABORATORY INSTRUMENTS (


MECHANICAL)

20-Dec-15

913

EDN

C&I-BOP PR
MECH

BTG-XXX-MNL-M-0252

EN-DG-1050-145-6034

O&M MANUAL FOR BOUGHT OUT ITEMS ( MECHANICAL)

914

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0123

EN-DG-1050-145-7001

DATA SHEET ,DRAWING & BOM FOR MASTER DIGITAL CLOCK


SYSTEM

NTP

30-Jul-15

915

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7002

QUALITY PLAN FOR MASTER DIGITAL CLOCK SYSTEM

NTP

30-Jul-15

916

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0124

EN-DG-1050-145-7003

DATA SHEET FOR ELECTRONIC PR & DIFF PR TRANSMITTERS

NTP

30-Jul-15

917

EDN

C&I-BOP PR
ELECT

BTG-XXX-LIST-E-0234

EN-DG-1050-145-7004

QUALITY CHECKLIST FOR TRANSMITTERS

NTP

30-Jul-15

918

EDN

C&I-BOP PR
ELECT

BTG-AXC-LIST-E-0235

EN-DG-1050-145-7005

Feeder List, Load & Battery Sizing Calculation for UPS System.

NTP

30-Apr-15

919

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7006

QUALITY PLAN FOR UPS SYSTEM

NTP

30-Jul-15

920

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0125

EN-DG-1050-145-7007

DATA SHEET & SIZING CALUCULATION FOR NI CD BATTERY


OF UPS

NTP

30-Jul-15

921

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7008

QUALITY PLAN FOR BATTERY OF UPS

NTP

30-Jul-15

922

EDN

C&I-BOP PR
ELECT

BTG-BTQ-DSH-E-0236

EN-DG-1050-145-7009

DATA SHEET, DRG FOR 24V DC BATTERY CHARGER SYSTEM


& DCDB

NTP
30-May-16

30-Jun-15

14 OF 276

FSUB_A_DT

2X660 MW IB VALLEY TPS


FAPP_A_DT

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

NTP
Remarks

MASTER DRAWING LIST

COMP_S

COMP_A

FSUB_S_DT

2X660 MW IB VALLEY TPS

FSUB_A_DT

FAPP_A_DT

26-Aug-13

26-Aug-13

24-Sep-13

15-Sep-13
15-Sep-13
15-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13

30-Nov-13
7-Dec-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

923

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7010

QUALITY PLAN FOR 24V DV BATTERY CHARGER SYTEM

NTP

30-Jun-15

924

EDN

C&I-BOP PR
ELECT

BTG-BT-DSH-E-0237

EN-DG-1050-145-7011

DATA SHEET & SIZING CALUCULATION FOR CHARGERBATTERY

NTP

30-Jun-15

925

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7012

QUALITY PLAN FOR BATTERY OF CHARGER

NTP

30-Jun-15

926

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0238

EN-DG-1050-145-7013

DATA SHEET,DRG FOR INSTRUMENATION CABLE

NTP

30-Jul-15

927

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7014

QUALITY PLAN FOR INSTRUMENTAYTION CABLE

NTP

30-Jul-15

928

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0239

EN-DG-1050-145-7015

DATA SHEET, DRG FOR COMPENSATING ( THERMO COUPLE)


CABLE

NTP

30-Jul-15

929

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7016

QUALITY PLAN FOR COMPENSATING ( THERMO COUPLE)


CABLE

NTP

30-Jul-15

930

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0126

EN-DG-1050-145-7019

DATA SHEET FOR BAR GRAPH INDICATORS

NTP

30-Jun-15

931

EDN

C&I-BOP PR
ELECT

BTG-XXX-LIST-E-0241

EN-DG-1050-145-7020

QUALITY CHECK LIST FOR INDICATORS

NTP

30-Jun-15

932

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0127

EN-DG-1050-145-7021

DATA SHEET FOR HART MANAGEMENT SYSTEM

NTP

30-Jul-15

933

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7022

QUALITY PLAN FOR HMS

NTP

30-Jul-15

934

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0128

EN-DG-1050-145-7023

DATA SHEET,DRG FOR JUNCTION BOX

NTP

30-Jul-15

935

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0129

EN-DG-1050-145-7024

DATA SHEET of UPS System

NTP

30-Jul-15

936

EDN

C&I-BOP PR
ELECT

BTG-BTQ-LIST-E-0242

EN-DG-1050-145-7025

Feeder List, Load & Battery sizing calculation for 24V DC Charger
System.

NTP

15-Apr-15

937

EDN

C&I-BOP PR
ELECT

BTG-XXX-MNL-E-0244

EN-DG-1050-145-7027

O&M MANUAL FOR MAJOR BOUGHT OUT ITEMS


(ELECTRICAL)

NTP

30-May-16

938

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0130

EN-DG-1050-145-7027

DATA SHEET FOR TURBINE SUPERVISORY


INSTRUMENTATION

939

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7028

QUALITY PLAN FOR JUNTION BOX

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

31-Dec-14

30-Jul-14
NTP

940

EDN

C&I-BOP PR
ELECT

EN-DG-1050-145-7030

DATA SHEET FOR GUIDED WAVE RADAR TYPE LEVEL


TRANSMITTER

941

EDN

C&I-BOP PR
ELECT

EN-DG-1050-145-7031

DATA SHEET FOR ULTRASONIC TYPE LEVEL TRANSMITTER

942

EDN

C&I-BOP PR
ELECT

EN-DG-1050-145-7032

DATA SHEET FOR HAND HELD HART

943

EDN

C&I-BOP PR
ELECT

EN-DG-1050-145-7033

DATA SHEET FOR TEMPERATURE TRANSMITTER

944

EDN

PADO

EN-DG-1050-145-8004

PADO - SYSTEM DESCRIPTION FOR SR MODULE


NTP

945

EDN

PADO

EN-DG-1050-145-8001

ACCEPTANCE CRITERIA FOR PADO

946

EDN

PADO

EN-DG-1050-145-8002

CONFIGURATION BOM FOR PADO

947

EDN

PADO

EN-DG-1050-145-8003

Modular Furniture for PADO

948

EDN

PADO

EN-DG-1050-145-8005

SDD for Diagnostics package for PADO

949

EDN

PADO

EN-DG-1050-145-8006

PADO - FAT PROCEDURE FOR SR MODULE

950

EDN

PADO

EN-DG-1050-145-8007

FAT for Diagnostics package for PADO

951

BPL

MDL

Err:512

BHEL/BPL/CMG/IBV/001

MASTER DRAWING LIST-BPL

952
953
954

BPL
BPL
BPL

RE Joints
RE Joints
RE Joints

BTG-XXX-DWG-M-0253
BTG-XXX-SPC-M-0254
BTG-XXX-DWG-M-0255

BP-DG-391-133-0001
BP-DG-391-133-0002
BP-DG-391-133-0003

GA of RE Joint (PBT) -2500 NB


Painting Spec
GA of RE Joint for CW Pump (1800 NB)

A
A

LNTP
LNTP

LNTP

955

BPL

RE Joints

BTG-XXX-DWG-M-0256

BP-DG-391-133-0004

GA of RE Joint for Raw Water Pump (600 NB)

LNTP

956

BPL

RE Joints

BTG-XXX-DWG-M-0257

BP-DG-391-133-0005

GA of RE Joint for CW Makeup Pump (500 NB)

LNTP

957

BPL

Flash Tank

BTG-XXX-DWG-M-0258

BP-DG-391-147-0001

Arrgt. of HP Drain Flash Tank

958

BPL

Flash Tank

BTG-XXX-DWG-M-0259

BP-DG-391-147-0002

Arrgt. of LP Drain Flash Tank

959

BPL

Flash Tank

BTG-XXX-DWG-M-0260

BP-DG-391-147-0003

Arrgt. of Steam Drain Flash Tank

960

BPL

Flash Tank

BTG-XXX-DWG-M-0261

BP-DG-391-147-0004

Arrgt. of Unit Flash Tank

961

BPL

Flash Tank

BTG-XXX-DWG-M-0262

BP-DG-391-147-0005

Arrgt. of FWHSVD Flash Tank

962

BPL

Misc. Tank

BTG-QSV-DWG-M-022

BP-DG-391-167-0001

GA of Clean Oil Tank

963

BPL

Misc. Tank

BTG-QSV-DWG-M-0264

BP-DG-391-167-0002

GA of Dirty Oil Tank

964

BPL

Misc. Tank

BTG-XXX-DWG-M-0265

BP-DG-391-167-0003

Arrgt & Assy of Oil Unloading Vessel

965

BPL

Misc. Tank

BTG-XXX-DWG-M-0266

BP-DG-391-167-0004

GA of DMCW O/H Tank

966

BPL

Misc. Tank

BTG-XXX-DWG-M-0267

BP-DG-391-167-0005

Potable Water Tank

967
968
969
970
971
972
973

BPL
BPL
BPL
BPL
BPL
BPL
BPL

BF Valves
BF Valves
BF Valves
BF Valves
BF Valves
BF Valves
BF Valves

BTG-XXX-DWG-M-0268
BTG-XXX-DWG-M-0269
BTG-XXX-MNL-M-0270
BTG-XXX-DWG-M-0271
BTG-XXX-MNL-M-0272
BTG-XXX-DWG-M-0273

BP-DG-391-165-0001
BP-DG-391-165-0002
BP-DG-391-165-0003
BP-DG-391-165-0004
BP-DG-391-165-0005
BP-DG-391-165-0006
BP-DG-391-165-0007

Arrgt. of 2500 Dia BFV with Elect. Actuator


Arrgt. of 800 Dia BFV with Elec. Actuator
Arrgt. of 800 Dia BFV with Manual Operator
Arrgt. of 450 Dia BFV with Elec. Actuator
Arrgt. of 450 Dia BFV with Manual Operator
Arrgt. of 400 Dia BFV With Elec. Actuator
Arrgt. of 400 Dia BFV with Manual Operator

BTG-KKS-DWG-I-0131

BTG-XXX-MNL-M-0284

30-Aug-15

NTP

30-Aug-15

NTP

15-Apr-15
15-Apr-15

NTP

15-Apr-15

NTP

15-Apr-15

NTP

15-Apr-15

NTP

15-Apr-15

NTP

15-Apr-15

NTP
1 (i)

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

30-Jul-15

NTP

30-Jul-15

NTP

LNTP
LNTP

LNTP

A
A
A
A
A
A

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

LNTP

5-May-14

19-May-14

15-Sep-13

13-Sep-13

13-Nov-13

5-May-14

19-May-14

15-Sep-13

13-Sep-13

13-Nov-13

5-May-14

19-May-14

15-Sep-13

13-Sep-13

13-Nov-13

15-Sep-13

18-Sep-13

1-Mar-14

15-Sep-13

18-Sep-13

1-Mar-14

31-Oct-13
31-Oct-13
31-Oct-13
31-Oct-13
31-Oct-13
31-Oct-13
31-Oct-13

24-Oct-13
24-Oct-13
24-Oct-13
24-Oct-13
24-Oct-13
24-Oct-13
24-Oct-13

30-Nov-13
30-Nov-13
30-Nov-13
30-Nov-13
30-Nov-13
30-Nov-13
30-Nov-13

15 OF 276

C
C
E

C
C
C
C
B
C
C
C
B
C
C
C
C
C
C
C
C

10-Oct-13

4-Nov-13

16-Jul-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

11-Mar-14

20-Mar-14

11-Mar-14

20-Mar-14

11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14

2-Apr-14
2-Apr-14
2-Apr-14
2-Apr-14
2-Apr-14
2-Apr-14
2-Apr-14

A
A
A
B

12-Feb-14

20-Mar-14

A
B
B
B
B
B
B
B
C
B
C
B
B

19-Jun-14
19-Jun-14
19-Jun-14
29-Mar-14

3-Apr-14

29-Mar-14

3-Apr-14

A
A

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
974

BPL

FD Fan Motor

BTG-HLB-DWG-E-0245

BP-DG-391-106-0001

OGA

975

BPL

FD Fan Motor

BTG-HLB-DSH-E-0246

BP-DG-391-106-0002

Tech. Data Sheet

976

BPL

FD Fan Motor

BTG-HLB-DWG-E-0247

BP-DG-391-106-0003

PSTB for Direct Termination

977

BPL

FD Fan Motor

BTG-HLB-DWG-E-0248

BP-DG-391-106-0004

Neurtal Terminal Arrgt.

978

BPL

FD Fan Motor

BTG-HLB-DWG-E-0502

BP-DG-391-106-0005

Aux. TB for RTDS & BTDS

979

BPL

FD Fan Motor

BTG-HLB-DWG-E-0503

BP-DG-391-106-0006

Aux. TB for Space Heater

980

BPL

FD Fan Motor

BTG-HLB-DWG-E-0249

BP-DG-391-106-0007

CT Secondary Terminal Box Arrgt.

981

BPL

FD Fan Motor

CABLE DETAILS

982

BPL

FD Fan Motor

SPECIFICATION OF FD FAN MOTOR

983

BPL

PA Fan Motor

BTG-QHL-DWG-E-0250

BP-DG-391-109-0001

OGA

984

BPL

PA Fan Motor

BTG-QHL-DSH-E-0251

BP-DG-391-109-0002

Tech. Data Sheet

985

BPL

PA Fan Motor

BTG-QHL-DWG-E-0252

BP-DG-391-109-0003

Stator Terminal Box (PSTB)

986

BPL

PA Fan Motor

BTG-QHL-DWG-E-0253

BP-DG-391-109-0004

Neutral TB Arrgt.

987

BPL

PA Fan Motor

BTG-QHL-DWG-E-0254

BP-DG-391-109-0005

Aux. TB for RTDS & BTDS

988

BPL

PA Fan Motor

BTG-QHL-DWG-E-0504

BP-DG-391-109-0006

Aux. TB for Space Heater

989

BPL

PA Fan Motor

BTG-QHL-DWG-E-0255

BP-DG-391-109-0007

CT Secondary Terminal Box Arrgt.

990

BPL

PA Fan Motor

BP-DG-391-109-0008

Details of Anchoring arrangement

991

BPL

PA Fan Motor

CABLE DETAILS

992

BPL

PA Fan Motor

SPECIFICATIONOF AC/DC MOTOR

993

BPL

ID Fan Motor

BTG-HNC-DWG-E-0256

BP-DG-391-107-0001

OGA

994

BPL

ID Fan Motor

BTG-HNC-DSH-E-0257

BP-DG-391-107-0002

Tech. Data Sheet

995

BPL

ID Fan Motor

BTG-HNC-DWG-E-0258

BP-DG-391-107-0003

Main Termianl Box

996

BPL

ID Fan Motor

BTG-HNC-DWG-E-0259

BP-DG-391-107-0004

Aux. TB for RTDS & BTDS

997

BPL

ID Fan Motor

BTG-HNC-DWG-E-0260

BP-DG-391-107-0005

Aux. TB for Space Heater

998

BPL

ID Fan Motor

BTG-HNC-DWG-E-0261

BP-DG-391-107-0006

CT Secondary Terminal Box Arrgt.

999

BPL

ID Fan Motor

BTG-XXX-DWG-M-0285

BP-DG-391-107-0007

Anchoring Arrgt.

1000

BPL

ID Fan Motor

BP-DG-391-107-0008

Neutral terminal box arrangement

1001

BPL

ID Fan Motor

CABLE DETAILS

1002

BPL

ID Fan Motor

SPECIFICATIONOF AC/DC MOTOR

1003

BPL

CEP Motor

BTG-LCB-DWG-E-0262

BP-DG-391-143-0001

OGA

1004
1005

BPL
BPL

CEP Motor
CEP Motor

BTG-LCB-DSH-E-022
BTG-LCB-DWG-E-0264

BP-DG-391-143-0002
BP-DG-391-143-0003

Tech. Data Sheet


PSTB for Direct Termination

1006

BPL

CEP Motor

BTG-LCB-DWG-E-0265

BP-DG-391-143-0004

Aux. TB for RTDS & BTDS

1007

BPL

CEP Motor

BTG-LCB-DWG-E-0266

BP-DG-391-143-0005

Aux. Terminal Box for Space Heater

1008

BPL

CEP Motor

BTG-LCB-DWG-E-0267

BP-DG-391-143-0006

Neutral TB Arrgt.

1009
1010
1011
1012
1013
1014
1015
1016

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor

BTG-LAC-DWG-E-0268
BTG-LAC-DSH-E-0269
BTG-LAC-DWG-E-0270
BTG-LAC-DWG-E-0271
BTG-LAC-DWG-E-0272
BTG-LAC-DWG-E-0273
BTG-LAC-DWG-E-0274
BTG-LAC-DWG-E-0275

BP-DG-391-139-0001
BP-DG-391-139-0002
BP-DG-391-139-0003
BP-DG-391-139-0004
BP-DG-391-139-0005
BP-DG-391-139-0006
BP-DG-391-139-0007
BP-DG-391-139-0008

1017
1018
1019
1020
1021
1022
1023
1024
1025
1026

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
DMCW-SG
Motor

BTG-HFC-DWG-E-0275
BTG-HFC-DSH-E-0276
BTG-HFC-DWG-E-0277
BTG-HFC-DWG-E-0278
BTG-HFC-DWG-E-0279
BTG-HFC-DWG-E-0280
BTG-XXX-DWG-S-0068
BTG-HFC-DWG-E-0281
BTG-HFC-DWG-E-0282
BTG-PGC-DWG-E-0282

1027

BPL

DMCW-SG
Motor

1028

BPL

1029

LNTP
Purpose reference
(I/ A)
A
A
I

COMP_S
Remarks
LNTP
LNTP
LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

A
I

LNTP
LNTP

LNTP

LNTP

LNTP

I
I

2X660 MW IB VALLEY TPS


FAPP_A_DT

LNTP
LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

OGA
Tech. Data Sheet
Stator Terminal Box (PSTB)
Neutral Terminal Arrgt.
Aux. Terminal Box for Space Heater
Aux. Terminal Box (RTD & BTD)
Secondary TB
Aux. Terminal Box for hot & cold air duct

A
A
I
I
I
I
I
I

NTP
NTP
NTP
NTP
NTP
NTP
NTP

BP-DG-391-213-0001
BP-DG-391-213-0002
BP-DG-391-213-0003
BP-DG-391-213-0004
BP-DG-391-213-0005
BP-DG-391-213-0006
BP-DG-391-213-0007
BP-DG-391-213-0008
BP-DG-391-213-0009
BP-DG-391-152-0001

OGA
Tech. Data Sheet
PSTB for Direct Termination
Neutral Terminal Arrgt.
Aux. TB for RTDS & BTDS
Aux. Terminal Box for Space Heater
Foundation Arrgt.
Non Contact Type Speed Switch
Aux. Terminal Box for Space Heater
OGA

A
A
I
I
I
I
I
I
I
A

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

BTG-PGC-DSH-E-0283

BP-DG-391-152-0002

Tech. Data Sheet

DMCW-SG
Motor

BTG-PGC-DWG-E-0284

BP-DG-391-152-0003

PSTB for Direct Termination

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0285

BP-DG-391-152-0004

Aux. Terminal Box (RTD & BTD)

1030

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0286

BP-DG-391-152-0005

Aux. Terminal Box for Space Heater

1031

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0287

BP-DG-391-152-0006

Neutral Terminal Arrgt.

1032

BPL

DMCW-SG
Motor

BTG-XXX-DWG-S-0069

BP-DG-391-152-0007

Foundation Arrgt.

1033

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0288

BP-DG-391-152-0011

OGA

1034

BPL

DMCW-TG
Motor

BTG-PGC-DSH-E-0289

BP-DG-391-152-0012

Tech. Data Sheet

1035

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0290

BP-DG-391-152-0013

PSTB for Direct Termination

1036

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0291

BP-DG-391-152-0014

Aux. Terminal Box (RTD & BTD)

1037

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0292

BP-DG-391-152-0015

Aux. Terminal Box for Space Heater

NTP

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FAPP
CAT

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13
15-Dec-13

21-Dec-13
21-Dec-13

16-Jan-14
16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14

10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14

B
C
B
B
B
B
B

15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
28-Feb-14

9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14

31-Jan-14
1-Feb-14
2-Feb-14
3-Feb-14
4-Feb-14
5-Feb-14
6-Feb-14
7-Feb-14
8-Feb-14

B
C
F
E
F
F
F
F
E

28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14

16 OF 276

C
C
C
B

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

11-Apr-14

5-May-14

11-Apr-14

5-May-14

11-Apr-14
11-Apr-14

5-May-14
6-May-14

B
B

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

26-Mar-14

26-Apr-14

26-Mar-14

26-Apr-14

26-Mar-14

26-Apr-14

A
B

E
E

E
E
E
E
E
A
C
C

E
E
E
E
C

26-Nov-13

E
E
C
C
C

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

12-Jun-14

4-Jul-14

5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14

19-Mar-14
19-Mar-14
19-Mar-14
19-Mar-14
19-Mar-14
19-Mar-14
19-Mar-14
19-Mar-14

A
B
E
E
F
E
F

12-Jun-14

4-Jul-14

A
B

F
E
E
E
E
E
E
E
C
F
F
F
F

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

COMP_S

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

1038

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0293

BP-DG-391-152-0016

Neutral Terminal Arrgt.

1039

BPL

DMCW-TG
Motor

BTG-XXX-DWG-S-0070

BP-DG-391-152-0018

Foundation Arrgt.

1040

BPL

ACW Motor

BTG-PCB-DWG-E-0294

BP-DG-391-154-0001

OGA

1041

BPL

ACW Motor

BTG-PCB-DSH-E-0295

BP-DG-391-154-0002

Tech. Data Sheet

1042

BPL

ACW Motor

BTG-PCB-DWG-E-0296

BP-DG-391-154-0003

PSTB for Direct Termination

1043

BPL

ACW Motor

BTG-PCB-DWG-E-0297

BP-DG-391-154-0004

Aux. Terminal Box (RTD & BTD)

1044

BPL

ACW Motor

BTG-PCB-DWG-E-0298

BP-DG-391-154-0005

Aux. Terminal Box for Space Heater

1045

BPL

ACW Motor

BTG-PCB-DWG-E-0299

BP-DG-391-154-0006

Neutral Terminal Arrgt.

1046

BPL

ACW Motor

BTG-XXX-DWG-S-0071

BP-DG-391-154-0007

Foundation Arrgt.

1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT

BTG-BAT-DWG-E-0300
BTG-BAT-LIST-E-0301
BTG-XXX-DWG-S-0072
BTG-BAT-DWG-E-0302
BTG-BAT-DWG-E-0303
BTG-BAT-DWG-E-0304
BTG-XXX-DWG-M-0290
BTG-BAT-DWG-E-0305
BTG-XXX-DWG-I-0132
BTG-XXX-DWG-M-0291
BTG-XXX-SCH-M-0286
BTG-XXX-DWG-M-0287
BTG-XXX-DWG-M-0288
BTG-BAT-DSH-E-0306
Err:512

BP-DG-391-301-0001
BP-DG-391-301-0002
BP-DG-391-301-0003
BP-DG-391-301-0004
BP-DG-391-301-0005
BP-DG-391-301-0006
BP-DG-391-301-0007
BP-DG-391-301-0008
BP-DG-391-301-0009
BP-DG-391-301-0010
BP-DG-391-301-0011
BP-DG-391-301-0012
BP-DG-391-301-0013
BP-DG-391-301-0014
BP-DG-391-301-0015

OGA
OGA Part List
Foundation Plan
HV Bushing
LV Bushing
Neutral Bushing
Bi-Direction Roller
LV Bus duct mounting
Loading gauge diagram
Rating & Diagram Plate
Valve schedule Plate
GA of Cooler Control Cabinet
Cooler control scheme
Data Sheet
Customers Inspection Test Schedule

A
A
A
I
I
I
I
A
I
A
I
A
A
A
A

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

GT
GT
GT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT

BTG-XXX-DWG-M-0289
Err:512
Err:512
BTG-AXT-DWG-E-0307
BTG-AXT-LIST-E-0308
BTG-XXX-DWG-S-0073
BTG-AXT-DWG-E-0309
BTG-AXT-DWG-E-0310
BTG-AXT-DWG-E-0311
BTG-XXX-DWG-M-0290
BTG-AXT-DWG-E-0312
BTG-XXX-DWG-I-0133
BTG-XXX-DWG-M-0291
BTG-XXX-DWG-M-0292
BTG-XXX-DWG-M-0293
BTG-XXX-DWG-M-0294
BTG-AXT-DSH-E-0313
Err:512

BP-DG-391-301-0016
BP-DG-391-301-0017
BP-DG-391-301-0018
BP-DG-391-302-0001
BP-DG-391-302-0002
BP-DG-391-302-0003
BP-DG-391-302-0004
BP-DG-391-302-0005
BP-DG-391-302-0006
BP-DG-391-302-0007
BP-DG-391-302-0008
BP-DG-391-302-0009
BP-DG-391-302-0010
BP-DG-391-302-0011
BP-DG-391-302-0012
BP-DG-391-302-0013
BP-DG-391-302-0014
BP-DG-391-302-0015

Over Fluxing withstand curve


Diagram of Common Kiosk
GA of Common Kiosk
OGA
OGA Part List
Foundation Plan
HV Bushing
LV Bushing
Neutral Bushing
Bi-Direction Roller
Bus duct mounting Flange
Loading gauge diagram
Rating & Diagram Plate
Valve schedule Plate
GA of Cooler Control Cabinet
Cooler control scheme
Data Sheet
Customers Inspection Test Schedule

I
A
A
A
A
A
I
I
I
I
A
I
A
I
A
A
A

NTP
NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

LNTP

1080

BPL

BP-DG-391-302-0016

Schematic diagram of independent tap changer control

1081

BPL

Switchgear

BTG-XXX-DWG-E-0511

BP-DG-391-505-0001

Layout & Floor Plan - Unit SW BD -1

1082

BPL

Switchgear

BTG-XXX-DWG-E-0512

BP-DG-391-505-0002

Layout & Floor Plan - Unit SW BD -2

1083

BPL

Switchgear

BTG-XXX-DWG-E-0513

BP-DG-391-505-0003

Layout & Floor Plan - Unit SW BD -3

1084

BPL

Switchgear

BTG-XXX-DWG-E-0514

BP-DG-391-505-0004

Layout & Floor Plan - Unit SW BD -4

1085

BPL

Switchgear

BTG-XXX-DWG-E-0515

BP-DG-391-505-0005

Layout & Floor Plan - Station SW BD -1

1086

BPL

Switchgear

BTG-XXX-DWG-E-0516

BP-DG-391-505-0006

Layout & Floor Plan - Station SW BD -2

1087

BPL

Switchgear

BTG-XXX-DWG-E-0517

BP-DG-391-505-0007

Layout & Floor Plan - Station SW BD -3

1088

BPL

Switchgear

BTG-XXX-DWG-E-0518

BP-DG-391-505-0008

Layout & Floor Plan - Station SW BD -4

1089

BPL

Switchgear

BTG-BHA-DWG-E-0314

BP-DG-391-505-0009

Layout Bus Transfer Panel

1090

BPL

Switchgear

BTG-BHA-DWG-E-0315

BP-DG-391-505-0010

Schematic Diagram Bus Transfer

1091

BPL

Switchgear

BTG-BHA-DWG-E-0316

BP-DG-391-505-0011

Schematic Diagram Motor feeder

1092

BPL

Switchgear

BTG-BHA-DWG-E-0317

BP-DG-391-505-0012

Schematic Diagram Motor feeder

1093

BPL

Switchgear

BTG-BHA-DWG-E-0318

BP-DG-391-505-0013

Schematic Diagram Transformer. Feeder

1094

BPL

Switchgear

BTG-BHA-DWG-E-0319

BP-DG-391-505-0014

Schematic Diagram Outgoing feeder

1095

BPL

Switchgear

BTG-BHA-DWG-E-0320

BP-DG-391-505-0015

Schematic Diagram Incomer

1096

BPL

Switchgear

BTG-BHA-DWG-E-0321

BP-DG-391-505-0016

Schematic Diagram Tie feeder

1097

BPL

Switchgear

BTG-BHA-DWG-E-0322

BP-DG-391-505-0017

Schematic Diagram Bus PT

1098

BPL

Switchgear

BTG-BHA-DWG-E-0323

BP-DG-391-505-0018

Schematic Diagram Feeder PT

1099

BPL

Switchgear

BTG-BHA-DWG-E-0324

BP-DG-391-505-0019

Key Diagram for Unit SWBD-1

1100

BPL

Switchgear

BTG-BHA-DWG-E-0325

BP-DG-391-505-0020

Key Diagram for Unit SWBD-2

1101

BPL

Switchgear

BTG-BHA-DWG-E-0326

BP-DG-391-505-0021

Key Diagram for Unit SWBD-3

1102

BPL

Switchgear

BTG-BHA-DWG-E-0327

BP-DG-391-505-0022

Key Diagram for Unit SWBD-4

1103

BPL

Switchgear

BTG-BHA-DWG-E-0328

BP-DG-391-505-0023

Key Diagram for Stn. SWBD-1

1104

BPL

Switchgear

BTG-BHA-DWG-E-0329

BP-DG-391-505-0024

Key Diagram for Stn. SWBD-2

1105

BPL

Switchgear

BTG-BHA-DWG-E-0330

BP-DG-391-505-0025

Key Diagram for Stn. SWBD-3

1106

BPL

Switchgear

BTG-BHA-DWG-E-0331

BP-DG-391-505-0026

Key Diagram for Stn. SWBD-4

1107

BPL

GRP

BTG-MKY-DWG-E-0332

BP-DG-391-305-0001

OGA Drawing of Generator, GT and UAT Protection Panel

1108

BPL

GRP

BTG-MKY-DWG-E-0333

BP-DG-391-305-0002

Schematic Drawing of Generator, GT and UAT Protection Panel

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

NTP

LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

28-Feb-14
28-Feb-14
31-Mar-14
31-Mar-14
31-Mar-14
31-Mar-14
31-Mar-14
31-Mar-14
31-Mar-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

19-Feb-14
19-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
19-Feb-14
19-Feb-14
28-Feb-14
19-Feb-14
19-Feb-14
28-Feb-14
28-Feb-14
19-Feb-14
28-Feb-14

C
C
F
F
F
F
E
C
F
C
E
C
C
C

31-Jan-14
31-Jan-14
31-Jan-14
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13

31-Jan-14
31-Jan-14
31-Jan-14
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
19-Sep-13
19-Sep-13
21-Sep-13
24-Oct-13

28-Feb-14
28-Feb-14
28-Feb-14
25-Oct-13
25-Oct-13
26-Feb-14
25-Oct-13
25-Oct-13
25-Oct-13
22-Feb-14
25-Oct-13
22-Feb-14
25-Oct-13
3-May-14
11-Nov-13
11-Nov-13
25-Oct-13

F
B
B
C
C
E
C
C
C
E
F
E
C
E
C
C
C

30-Sep-13

19-Sep-13

31-May-14

27-Jun-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

21-Jul-14

31-May-14

27-Jun-14

31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14

17 OF 276

C
C
C
C
C
C
C

11-Mar-14
11-Mar-14
12-Jun-14
20-Mar-14

2-Apr-14
2-Apr-14
20-Jun-14
9-May-14

A
C
B

11-Mar-14
11-Mar-14
6-Feb-14
6-Feb-14

2-Apr-14
2-Apr-14
21-Feb-14
21-Feb-14

A
B
B
F

6-Feb-14
6-Feb-14
6-Feb-14

21-Feb-14
21-Feb-14
21-Feb-14

F
F
F

6-Feb-14

21-Feb-14

6-Feb-14

21-Feb-14

30-May-14

20-Jun-14

30-May-14

20-Jun-14

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
1109

BPL

QAP

BTG-BAT-DWG-E-0334

QA/TCB/31/72

270MVA, 21/420KV 1 Ph- Generator Transformer

1110

BPL

QAP

BTG-AXT-DWG-E-0335

QA/TCB/31/764

50MVA, 400/11.5KV 3 Ph. Reserve Auxiliary Transformer

1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
Vendor List

BTG-XXX-QAP-M-0295
BTG-XXX-QAP-M-0296
BTG-XXX-QAP-M-0297
BTG-XXX-QAP-M-0298
BTG-XXX-QAP-M-0299
BTG-XXX-QAP-M-0300
BTG-XXX-QAP-E-0336
BTG-XXX-QAP-E-0337
BTG-XXX-QAP-E-0338
BTG-XXX-QAP-M-0301
BTG-BAT-LIST-E-0339

QA-G/TH/1174
QA-G/TH/1175
QA-G/TH/1176
QA-G/TH/1177
QA-G/TH/1206
QA-G/TH/1179
QA/MT/IMM-803
QA/MT/LEM-803
QAQC/SCR/15/780
QAQC/SCR/15/781
QA/TCB/24/52

QA Plan for BF Valve (Cast)


QA Plan for BF Valve (Fab.)
QA Plan for Flash Tanks
QA Plan for Misc. Tanks
QA Plan for RE Joints (Tied type)
QA Plan for RE Joints (Conv.)
QA Plan for Medium Range Motors
QA Plan for Large Range Motors
QA Plan for Indoor Switchgear
QA Plan for Gen. Prot. Relay Panel
Vendor List of Generator Transformer

1122

BPL

Vendor List

BTG-AXT-LIST-E-0340

QA/TCB/24/564

Vendor List of Reserve Aux. Transformer

1123

BPL

Vendor List

BTG-XXX-LIST-E-0341

QA/MT/VL-11-12

Vendor List for HT Motors

1124

BPL

Vendor List

BTG-XXX-LIST-M-0302

VENDOR LIST

Vendor List for RE Joins, Flash Tanks, Misc. Tanks, BF Valves

1125

BPL

Vendor List

BTG-XXX-LIST-E-0342

SWE/GRP/93023/VL

Vendor List for Gen. Prot. Relay Panel

1126

BPL

Vendor List

BTG-XXX-LIST-E-0343

BHEL/SWGR/VL/OPGCL/MH

Vendor List for Switchgears

1127

BPL

PA Fan Motor

BP-DG-391-109-0008

Anchoring Arrgt.

1128

BPL

ID Fan Motor

BTG-XXX-DWG-M-0304

BP-DG-391-107-0008

Neutral Terminal Box Arrgt.

1129

BPL

RAT

BTG-XXX-DWG-M-0305

BP-DG-391-302-0016

Schematic Diagram for Independent TAP Changer Control

1130
1131

RUD
RUD

MDL
ENG

Err:512
BTG-XXX-DWG-E-0344

RU-MDL-001
0 19 91 31 1001

MASTER DRAWING LIST-RUD


LAYOUT OF ISOLATED PHASE BUSDUCT

1132

RUD

ENG

BTG-UMC-DWG-S-0074

0 19 91 31 1002

FOUNDATION PLAN OF IP BUSDUCT

1133
1134

RUD
RUD

ENG
ENG

BTG-XXX-DWG-M-0306
BTG-XXX-DWG-E-0345

2 99 13 31 1003
2 99 13 31 1004

1135
1136
1137

RUD
RUD
RUD

ENG
ENG
ENG

BTG-XXX-DWG-E-0346
BTG-XXX-DWG-E-0347
BTG-BCA-DWG-E-0348

1138

RUD

ENG

1139
1140

RUD
RUD

1141

BTG-XXX-DWG-M-0303

LNTP
Purpose reference
(I/ A)
A

COMP_S
Remarks
LNTP

LNTP

A
A
A
A
A
A
A
A
A
A

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

A
A

LNTP
1 (i)

LNTP

LNTP

NTP

OGA OF SPVT CUBICLE


WIRING DIAGRAM OF SPVT CUBICLE

A
A

NTP

2 99 13 31 1005
2 99 13 31 1006
0 99 13 11 0001

OGA OF NG CUBICLE
WIRING DIGRAM OF NG CUBICLE
LAYOUT OF SEGREGATED PHASE BUSDUCT

A
A

NTP
NTP

LNTP

BTG-UMC-DWG-S-0075

0 99 13 11 0002

FOUNDATION PLAN OF SP BUSDUCT

ENG
ENG

Err:512
BTG-BCA-DWG-E-0349

2 99 13 31 1001
2 99 13 31 1002

SINGLE LINE DIAGRAM


WIRING DIAGRAM OF BUSDUCT CT's

RUD

ENG

BTG-MKA-DSH-E-0350

TDS/IPB/12-099-C-1

TECHNICAL DATA SHEET OF IP BUSDUCT

1142

RUD

ENG

BTG-BCA-DSH-E-0351

TDS/SPB/12-099-C-2

TECHNICAL DATA SHEET OF SP BUSDUCT

1143

RUD

ENG

BTG-XXX-DWG-M-0307

2 99 13 31 1007

OGA OF HOT AIR BLOWING EQUIPMENT

1144

RUD

ENG

BTG-XXX-DWG-M-0308

2 99 13 31 1008

SCHEMATIC DIAGRAM OF HOT AIR BLOWING EQUIPMENT

1145

RUD

ENG

BTG-XXX-LIST-E-0352

2 99 13 31 1008

STANDARD LIST OF SUB-VENDOR FOR BUSDUCT

1146
1147
1148
1149
1150
1151
1152
1153

RUD
RUD
RUD
RUD
RUD
RUD
RUD
HYD

QAP
ENG
ENG

BTG-MKA-DWG-E-0353
BTG-MKA-DWG-E-0354
BTG-MKA-DWG-E-0355

QAP/BD/12-099-C-1
2 99 13 31 1009
2 99 13 31 1010

A
A
A
I
I
I
I

MDL

Err:512

HYDDL001

MQP for SPBD & IPBD


OGA OF LAVT CUBICLE
WIRING DIAGRAM OF LAVT CUBICLE
TYPE TEST REPORT OF SPBD
TYPE TEST REPORT OF IPBD MAIN
TYPE TEST REPORT OF IPBD DELTA
TYPE TEST REPORT OF IPBD TAP OFF
MASTER DRAWING LIST-HYD

1154
1155

HYD
HYD

MECH
MECH

BTG-XXX-DWG-M-0309
BTG-XXX-PCD-M-0310

HY-DG-391-139-0102
HY-DG-391-139-0102W

STEAM AND DRAIN SCHEME


WRITE UP ON STEAM AND DRAIN SCHEME

1156
1157

HYD
HYD

MECH
MECH

BTG-QSV-DWG-M-0311
BTG-QSV-PCD-M-0312

HY-DG-391-139-0101
HY-DG-391-139-0101W

LUBE OIL SCHEME


WRITE UP ON LUBE OIL SCHEME

1158
1159

HYD
HYD

MECH
MECH

BTG-XXX-DWG-M-0313
BTG-XXX-PCD-M-0314

HY-DG-391-139-0103
HY-DG-391-139-0103W

JACKING OIL P&I DIAGRAM


WRITE UP ON JACKING OIL P&I DIAGRAM

1160

HYD

MECH

BTG-QSV-DWG-M-0315

HY-DG-391-139-0150

SCHEMATIC FOR DRAINING AND


AND MAKE UP LUBE OIL RESERVOIRS OF BFPDT

1161
1162
1163
1164
1165

HYD
HYD
HYD
HYD
HYD

MECH
MECH
MECH
MECH
MECH

BTG-XXX-DWG-M-0316
BTG-XXX-DWG-M-0317
BTG-XXX-DSH-M-0318
BTG-UMA-DWG-S-0076
BTG-LBA-DWG-M-0319

HY-DG-391-139-0107
HY-DG-391-139-0104
HY-DG-391-139-0105
HY-DG-391-139-0111
HY-DG-391-139-0114

LEGEND FOR SCHEME


GOVERNING SCHEME
WRITEUP ON GOVERNING SYSTEM.
FOUNDATION ARRANGEMENT
PIPING LAYOUT (STEAM)

I
I
I
I
A

1166

HYD

MECH

BTG-QSV-DWG-M-0320

HY-DG-391-139-0115

PIPING LAYOUT (LUBE OIL &CW)

1167

HYD

MECH

BTG-QSV-DSH-E-0354

HY-DG-391-139-0134

GA,DATA SHEETS & CHARACTERISTIC CURVE FOR LOP

1168

HYD

MECH

BTG-XXX-DSH-E-0355

HY-DG-391-139-0135

GA,DATA SHEETS &CHARACTERISTIC CURVE FOR EOP

1169

HYD

MECH

BTG-XXX-DSH-E-0356

HY-DG-391-139-0136

GA,DATA SHEETS &CHARACTERISTIC CURVE FOR JOP

1170

HYD

MECH

BTG-XXX-DWG-M-0321

HY-DG-391-139-0154B

FLOW DIAGRAM OF OIL PURIFIER

1171

HYD

MECH

BTG-XXX-DWG-M-0322

HY-DG-391-139-0154A

GA DRG OF OIL PURIFIER

1172

HYD

MECH

BTG-XXX-DWG-E-0357

HY-DG-391-139-0154C

ELECTRICAL WIRING DIAGRAM OF OIL PURIFIER

1173

HYD

I&C

BTG-XXX-DWG-I-0134

HY-DG-391-139-0106

TURBINE SUPERVISORY INSTRUMENTATION SCHEME

1174

HYD

I&C

BTG-XXX-SCH-I-0135

HY-DG-391-139-0118

INSTRUMENT SCHEDULE

NTP

LNTP

A
A

LNTP

LNTP

LNTP

NTP

LNTP

LNTP

4 (i)
4 (i)

LNTP

4 (i)
4 (i)

LNTP

LNTP

LNTP

24-Dec-13

21-Sep-13

24-Dec-13

15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
12-Jun-14
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13

21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
12-Jun-14
21-Sep-13
25-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13

12-Dec-13
12-Dec-13
12-Dec-13
12-Dec-13

C
C
C
C

26-Mar-14
29-Mar-14
24-Jan-14
24-Jan-14

12-Dec-13

23-Jun-14

19-Feb-14
19-Feb-14
19-Feb-14

B
C
B

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

19-Sep-13

15-Sep-13

19-Sep-13

30-Sep-13

24-Sep-13

26-Aug-13
25-Dec-13

26-Aug-13
26-Dec-13

24-Sep-13
11-Feb-14

25-Jan-14

24-Jan-14

27-Feb-14

25-Feb-14
25-Feb-14

10-Feb-14
10-Feb-14

28-Feb-14
28-Feb-14

25-Feb-14
25-Feb-14
10-Jan-14

10-Feb-14
10-Feb-14
27-Jan-14

28-Feb-14
28-Feb-14
28-Feb-14

B
B

25-Jan-14

27-Jan-14

28-Feb-14

25-Dec-13
15-Mar-14

26-Dec-13
29-Mar-14

11-Feb-14
4-May-14

11-Apr-14
11-Apr-14
5-Feb-14
5-Feb-14

B
B
A
A

15-May-14
23-Jun-14

10-Oct-13

4-Nov-13

29-Mar-14
29-Mar-14

4-May-14
4-May-14

29-Mar-14
29-Mar-14

4-May-14
4-May-14

B
A

12-May-14

29-Mar-14
12-May-14

4-May-14

12-May-14

29-Mar-14
29-Mar-14

4-May-14
4-May-14

A
B

12-May-14

10-Oct-13

4-Nov-13

11-Mar-14
3-Mar-14

20-Mar-14
7-Mar-14

11-Mar-14
3-Mar-14

20-Mar-14
7-Mar-14

11-Mar-14
3-Mar-14

20-Mar-14
7-Mar-14

11-Mar-14

20-Mar-14

3-Mar-14
11-Jun-14
11-Mar-14
20-May-14

7-Mar-14
21-Jul-14
20-Mar-14
9-Jun-14

12-May-14

C
B
B

26-Dec-13

11-Feb-14

24-Jan-14

27-Feb-14

25-Jan-14

24-Jan-14

27-Feb-14

15-Nov-14
10-Feb-14
10-Feb-14

10-Feb-14
10-Feb-14

28-Feb-14
28-Feb-14

26-Aug-13

26-Aug-13

24-Sep-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

B
B

12-May-14
12-May-14

F
F

15-Nov-14

B
B

2-Jun-14

4-Jul-14

30-Oct-13
30-Oct-13

17-Apr-14
2-Jun-14

4-Jul-14
4-Jul-14

30-Oct-13
30-Oct-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

30-Oct-13
30-Oct-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

30-Oct-13

13-Sep-13

19-Dec-13

30-Oct-13
30-Oct-13
30-Oct-13
20-Oct-13
30-Jul-15

13-Sep-13
27-Oct-13
27-Oct-13
24-Oct-13

1-Nov-13
26-Feb-14
26-Feb-14
1-Mar-14

25-Nov-13

19-Nov-13

31-Dec-13

25-Nov-13

25-Nov-13

24-Jan-14

B
B

11-Mar-14

20-Mar-14

B
B
B
F

30-May-15

30-May-15

30-May-15

56 weeks from
NTP order

30-May-15

56 weeks from
NTP order

30-May-15

56 weeks from
NTP order

30-May-15

56 weeks from
NTP order
17-Apr-14

18 OF 276

B
B

E
A

30-Jul-15

56 weeks from
NTP order

LNTP

26-Mar-14

25-Jan-14

56 weeks from
NTP order

4 (i)

25-Dec-13

64 weeks from
NTP order

LNTP

26-Mar-14

4-May-14

64 weeks from
NTP order

4 (i)

R2SUB_A_DT R2APP_A_DT R2APP


CAT

29-Mar-14

LNTP

LNTP
LNTP
LNTP
LNTP

11-Feb-14

LNTP
4 (i)
4 (i)
4 (i)
3 (vi)

26-Dec-13

4 (i)

21-Sep-13

15-Sep-13

25-Dec-13

LNTP
LNTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

15-Sep-13

4-May-14

NTP
NTP
NTP
NTP
NTP
NTP
NTP

4 (i)
4 (i)

FAPP
CAT

29-Mar-14

NTP

1 (i)

2X660 MW IB VALLEY TPS


FAPP_A_DT

11-Jun-14

E
B
E
F

19-Jun-14

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
1175

HYD

I&C

BTG-XXX-DWG-I-0136

HY-DG-391-139-0119

ATRS LOGIC DIAGRAM(SGC BFPDT TURBINE SYSTEM)

1176

HYD

I&C

BTG-XXX-PCD-I-0137

HY-DG-391-139-0116

WRITE UP ON ATRS (SGC BFPDT TURBINE SYSTEM )

1177

HYD

I&C

BTG-XXX-DWG-I-0138

HY-DG-391-139-0120

ATRS LOGIC DIAGRAM (SGC BFPDT OIL SYSTEM )

1178

HYD

I&C

BTG-XXX-PCD-I-0139

HY-DG-391-139-0130

WRITE UP ON ATRS(SGC BFPDT OIL SYSTEM )

1179
1180
1181

HYD
HYD
HYD

I&C
I&C
I&C

BTG-LAC-DWG-I-0140
BTG-XXX-PCD-E-0358
BTG-XXX-DWG-E-0359

HY-DG-391-139-0123
HY-DG-391-139-0157
HY-DG-391-139-0121

EHTC BLOCK DIAGRAM FOR BFPDT


WRITE UP ON EHTC
TSI LOOP DIAGRAM

LNTP
Purpose reference
(I/ A)
A
I
A
I
A
I
A

1182
1183

HYD
HYD

I&C
MECH

BTG-XXX-DWG-M-0333
BTG-XXX-DSH-M-0334

HY-DG-391-139-0165
HY-DG-391-139-0122

CLOSED LOOP DRAWINGS


CONTROL VALVE DATA SHEET

I
A

1184

HYD

MECH

BTG-XXX-DSH-M-0335

HY-DG-391-139-0166

SAFETY VALVE DATA SHEET

1185

HYD

MECH

BTG-HFC-DWG-M-0336

0-00-620-85893

GA DRAWING OF HP 1103 MILL.

1186

HYD

MECH

BTG-UMC-DWG-S-0077

0-00-610-85894

FOUNDATION PLAN OF HP 1103 MILL

1187
1188

HYD
HYD

MECH
MECH

BTG-QSV-DWG-M-0337
BTG-HFC-DWG-M-0338

1-61-190-85977
1-61-811-01850

LUBE OIL SYSTEM SCHEME


MILL HANDLING ARRANGEMENT

1189

HYD

MECH

BTG-XXX-DSH-M-0339

1-61-190-85977D

OPERATING PROCEDURE-LUBE OIL SYSTEM

1190

HYD

P&ID

BTG-XXX-SCH-M-0340

BA-PS-OPGCL-00

PAINTING SCHEDULE

1191

HYD

MECH

BTG-AXT-DSH-E-0313

BA-DS-OPGCL

1192

HYD

MECH

Err:512

QA DEPTT.

1193

HYD

MECH

BTG-XXX-LIST-M-0341

1194

HYD

MECH

BTG-HFC-DWG-M-0343

A
A
A
A
A

4 (i)
4 (i)

LNTP
LNTP
LNTP
LNTP
48 weeks from
NTP order

4 (i)

2-Jun-14
17-Apr-14

LNTP

56 weeks from
NTP order

3 (v)
4 (iii)
4 (ii)
4 (iii)

LNTP

24-Jan-14

25-Nov-13

24-Jan-14

25-Nov-13

25-Nov-13

31-Jan-14

25-Nov-13

25-Nov-13

24-Jan-14

25-Nov-13
25-Nov-13
31-Dec-14

25-Nov-13
25-Nov-13
25-Nov-13

31-Jan-14
24-Jan-14
24-Jan-14

25-Nov-13
30-May-15

25-Nov-13

24-Jan-14

30-May-15

2-Jun-14

21-Jul-14

25-Jun-14

LNTP
LNTP
LNTP
LNTP

25-Sep-13

21-Sep-13

24-Oct-13

25-Oct-13

24-Oct-13

5-Dec-13

25-Nov-13
25-Nov-13

19-Nov-13
19-Nov-13

24-Dec-13
24-Dec-13

25-Nov-13

19-Nov-13

24-Dec-13

11-Apr-14

15-May-14

27-Sep-13

6-Apr-14

25-Nov-13

24-Dec-13

24 weeks from
NTP

29-Apr-14

QA/CM to
decide.

27-Sep-13

BA-VL-HP1103

VENDOR LIST

QA/CM to
decide.

QA/CM to decide.

MHS-OPGCL-HP1103

MILL HANDLING ARRANGEMENT FOR COMPONENTS


HANDLING FOR MAINTENANCE.

4 (ii)

MECH

BTG-UMC-DWG-S-0078

HY-DG-11800057611

FOUNDATION ARRANGEMENT OF MDBFP SET

MECH

BTG-LAC-DWG-M-0344

HY-DG-11800057612

GENERAL ARRANGEMENT OF TDBFP SET

1197

HYD

MECH

BTG-LAC-DWG-M-0345

HY-DG-11800057613

GENERAL ARRANGEMENT OF MDBFP SET

1198
1199
1200
1201
1202
1203

HYD
HYD
HYD
HYD
HYD
HYD

MECH
MECH
MECH
MECH
I&C
I&C

BTG-LAC-DWG-M-0346
BTG-LAC-DWG-M-0347
BTG-LAC-DWG-M-0348
BTG-LAC-DWG-M-0349
BTG-LAC-DWG-M-0452
BTG-LAC-DWG-M-0453

HY-DG-11800057614
HY-DG-11800057615
HY-DG-11890057099
HY-DG-11890057100
HY-DG-11800057616
HY-DG-11800057617

SECTIONAL ASSEMBLY OF MDBFP


SECTIONAL ASSEMBLY OF TDBFP
SECTIONAL ASSEMBLY OF MD BP
SECTIONAL ASSEMBLY OF TD BP
PID FEED WATER OF MDBFP
PID SEALING & COOLING SYSTEM WATER OF MDBFP

1204

HYD

I&C

BTG-LAC-DWG-M-0454

HY-DG-11800057618

PID LUB & WORKING OIL SYSTEM OF MDBFP

1205

HYD

I&C

BTG-LAC-DWG-M-0455

HY-DG-11800057619

PID LUB OIL SYSTEM OF TDBFP SET

1206

HYD

I&C

BTG-LAC-DWG-M-0456

HY-DG-11800057620

PID FEED WATER SYSTEM FOR TDBFP

1207

HYD

I&C

BTG-LAC-DWG-M-0457

HY-DG-11800057621

PID SEALING & COOLING WATER SYSTEM FOR TDBFP

1208

HYD

MECH

BTG-UMC-DWG-S-0079

HY-DG-11800057622

GA & FOUNDATION OF MDBFP HC COOLERS

1209

HYD

MECH

BTG-LAC-DWG-M-0350

HY-DG-31800055679

MD BFP ESTIMATED PERFORMANCE CURVE

1210

HYD

MECH

BTG-LAC-DWG-M-0351

HY-DG-31890055586

MD BP ESTIMATED PERFORMANCE CURVE

1211

HYD

MECH

BTG-LAC-DWG-M-0352

HY-DG-31800055680

TD BFP ESTIMATED PERFORMANCE CURVE

1212

HYD

MECH

BTG-LAC-DWG-M-0353

HY-DG-31890055587

TD BP ESTIMATED PERFORMANCE CURVE

1213
1214
1215

HYD
HYD
HYD

I&C
I&C
MECH

Err:512
BTG-LAC-SCH-I-0142
BTG-XXX-DWG-M-0354

HY-DG-41800059734
HY-DG-41800059735
HY-DG-41800059736

INST.SCHEDULE OF MDBFP SET


INST. SCHEDULE OF TDBFP SET
OUTLINE DIM OF MDBFP & TDBFP RC VALVE (FOR LAYOUT
PURPOSE)

1216

HYD

MECH

BTG-XXX-DWG-M-0355

HY-DG-41890059648

GA OF SUCTION STRAINER MD & TD BOOSTER PUMP


(BASKET TYPE-FOR LAYOUT PURPOSE )

GA SUCTION STRAINER MD & TD BFP (CONICAL TYPE-FOR


LAYOUT PURPOSE)

HY-DG-41800059737

I
A
A
I
I
I
A
A
A
A
A
A
A
I
I
I
I
I
A
A
I

MECH
MECH

BTG-XXX-LIST-M-0357
BTG-XXX-SCH-E-0361

HY-DG-41800059738
HY-DG-41800059739

LUBE OIL REQUIREMENT LIST BFP


SCHEDULE OF MOTORS FOR PUMPS

1220

HYD

MECH

BTG-XXX-SCH-M-0358

HY-DG-41800059740

SCHEDULE OF SOLENIOD VALVES FOR BFP & CEP

1221

HYD

MECH

BTG-XXX-SCH-I-0143

HY-DG-41800059741

SCHEDULE OF ACTUATORS FOR BFP & CEP

1222

HYD

I&C

BTG-LA-DSH-M-0359

HY-DG-41800059742

RECOMMENDED ANNUNCIATION & TRIPS FOR MDBFP

1223

HYD

I&C

BTG-LA-PCD-M-0360

HY-DG-41800059743

INTERLOCKS &PROTECTIONS WRITE UP FOR MDBFP

1224
1225

HYD
HYD

MECH
INTERNAL
TEST

BTG-XXX-DSH-M-0361
BTG-XXX-DSH-M-0362

HY-DG-41800059744
Testing Dept

TECH. DATA SHEET BFP PACKAGE


SHOP TEST PROCEDURE MDBFP & TDBFP

A
A

1226

HYD

INTERNAL
TEST

BTG-XXX-DSH-M-032

Testing Dept

SHOP TEST PROCEDURE MDBP & TDBP

1227

HYD

MECH

BTG-XXX-DWG-E-0519

HY-DG-11810057220

GEN. ARRANGEMENT CEP AND MOTORS WITH FOUNDATION


DATA INCLUDING ALLOWABLE FORCES, MOMENT OF NOZZLE

MECH

BTG-LCB-DWG-M-0364

HY-DG-31810055587

CEP ESTIMATED PERFORMANCE CURVES

1229

HYD

I&C

BTG-LCB-DWG-M-0365

HY-DG-21810057021

SCHEMATIC DIAGRAM - SEALING AND COOLING FOR CEP

1230
1231
1232
1233
1234

HYD
HYD
HYD
HYD
HYD

I&C
I&C
I&C
MECH
MECH

BTG-LCB-DWG-I-0144
BTG-LCB-SCH-I-0145
BTG-LCB-PCD-M-0366
BTG-LCB-DSH-M-0367
BTG-LCB-DSH-M-0368

HY-DG-21810057022
HY-DG-41810059666
HY-DG-41810059667
HY-DG-41810059668
HY-DG-11810057221

INSTRUMENTATION SCHEME FOR CEP


INSTRUMENT SCHEDULE FOR CEP
PROTECTIONS WRITE UP FOR CEP
TECH. DATA SHEET CEP PACKAGE
CROSS SECTIONAL ASSEMBLY CEP

3 (v)
4 (ii)
4 (ii)
4 (ii)
4 (ii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

16-Jun-14

I
I
I
I
A
A

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

16-Jun-14

A
A
A
A
I

25-Oct-13

22-Nov-13

7-Oct-13

24-Oct-13

27-Nov-13

21-Oct-13

25-Oct-13

22-Nov-13

21-Oct-13
21-Sep-13
7-Oct-13
7-Oct-13
21-Dec-13
21-Dec-13

27-Oct-13
21-Sep-13
24-Oct-13
24-Oct-13
21-Dec-13
21-Dec-13

27-Nov-13
8-Jan-14
27-Nov-13
27-Nov-13
7-Feb-14
7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Oct-13

27-Oct-13

27-Jan-14

7-Oct-13

27-Oct-13

11-Nov-13

7-Oct-13

24-Oct-13

11-Nov-13

7-Oct-13

24-Oct-13

15-May-14

7-Oct-13

24-Oct-13

11-Nov-13

21-Dec-13
21-Dec-13
21-Oct-13

21-Dec-13
21-Dec-13
27-Oct-13

24-Jan-14
24-Jan-14
27-Nov-13

21-Oct-13

27-Oct-13

27-Nov-13

4 (i)
4 (i)

21-Oct-13

4 (i)
4 (i)
4 (i)
4 (i)
6 (v)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP

27-Oct-13

4 (i)
4 (i)
4 (i)
4 (i)
6 (v)
4 (ii)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

F
B
F

18-Jun-14
16-Jul-14

2-Jun-14

16-Jul-14

7-Dec-13

27-Jan-14

10-Jan-14
10-Jan-14

13-Feb-14
13-Feb-14

10-Jan-14

13-Feb-14

B
B
B

21-Oct-13
7-Oct-13

27-Oct-13
24-Oct-13

27-Nov-13
13-Feb-14

21-Oct-13

27-Oct-13

13-Feb-14

21-Oct-13

27-Oct-13

13-Feb-14

21-Dec-13

21-Dec-13

15-Feb-14

21-Dec-13

21-Dec-13

15-Feb-14

21-Jan-14
21-May-14

20-Jan-14
4-Jun-14

18-Feb-14

21-May-14

4-Jun-14

21-Oct-13

25-Oct-13

14-Mar-14

21-Oct-13

27-Oct-13

6-Nov-13

21-Dec-13
21-Dec-13
21-Dec-13
21-Jan-14
21-Oct-13

21-Dec-13
21-Dec-13
21-Dec-13
20-Jan-14
27-Oct-13

24-Jan-14
24-Jan-14
24-Jan-14
18-Feb-14
6-Nov-13

19 OF 276

B
A
B

13-Feb-14

3-Mar-14
15-Apr-14

7-Mar-14
16-May-14

3-Mar-14

7-Mar-14

A
A
A

C
C
C
F
B
A
C
B
B
B
B
B
B
B
E
E
F
F
B
B

13-Apr-14
E

26-Mar-14

6-Apr-14

20-May-14

26-May-14

26-Mar-14

6-Apr-14

16-Jun-14
26-Mar-14
26-Mar-14

21-Jul-14
10-Apr-14
10-Apr-14

13-Jun-14

21-Jul-14

13-Jun-14

21-Jul-14

26-Mar-14

10-Apr-14

26-Mar-14

10-Apr-14

26-Mar-14

10-Apr-14

26-Mar-14

A
B
B

10-Apr-14

B
B

B
B

16-Jun-14
16-Jun-14

26-May-14
E
26-May-14
E

F
E
E
E
B
16-Jun-14

21-May-14

C
C
C
C
F

16-Apr-14

13-Jun-14
13-Jun-14

21-Jul-14

13-Jun-14

21-Jul-14

26-May-14
F

26-Mar-14

10-Apr-14

21-May-14

26-May-14

16-Jun-14
16-Jun-14

21-Jul-14
21-Jul-14

21-May-14

26-May-14

16-Jul-14

21-May-14

9-Apr-14

16-Jul-14

21-May-14

16-Apr-14

9-Apr-14

13-Jun-14

16-Jun-14

F
24-Oct-13

20-Jun-14

4-Jun-14

10-Jan-14

6-Nov-13

7-Oct-13

4-Jun-14

F
16-Jun-14

27-Nov-13

LNTP
4 (i)

R3SUB_A_DT

16-Jul-14

LNTP

21-Jul-14

21-Oct-13

LNTP

3 (v)

21-Jul-14

LNTP

4 (ii)

HYD
HYD

HYD

3 (v)

R2SUB_A_DT R2APP_A_DT R2APP


CAT

30-Jun-14

4 (ii)

1218
1219

1228

25-Nov-13
LNTP

3 (v)

R1SUB_A_DT R1APP_A_DT R1APP


CAT

QUALITY PLAN

FAPP
CAT

56 weeks from
NTP order

2 (vii)

25-Nov-13

25-Nov-13

DATA SHEET

HYD

BTG-XXX-DWG-M-0356

4 (i)

LNTP

25-Nov-13

11-Apr-14

HYD

MECH

4 (i)

LNTP

24 weeks from 2-Jun-14


NTP

1196

HYD

4 (i)

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

1195

1217

4 (i)

COMP_S

A
F
B
B

16-Jul-14
16-Jul-14

11-Jun-14

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

1235
1236

HYD
HYD

I&C
MECH

BTG-CBA-LIST-E-0362
BTG-XXX-DWG-M-0369

HY-DG-41810059669
HY-DG-41810059670

LIST OF INPUTS TO DDCMIS


GA SUCTION STRAINER OF CEP(FOR LAYOUT PURPOSE)

1237

HYD

INTERNAL
TEST

BTG-XXX-DSH-M-0370

Testing Dept

SHOP PERFORMANCE TEST PROCEDUCER CEP

1238

HYD

MECH

BTG-UMC-DWG-S-0080

HY-DG-391-139-0112

AUXILIARY EQUIPMENT FOUNDATION

1239

HYD

MECH

BTG-XXX-DWG-M-0371

HY-DG-391-139-0125

ALLOWABLE FORCES & MOMENTS ON TURBINE FLANGES

1240

HYD

MECH

BTG-LAC-DWG-M-0372

HY-DG-391-139-0126

STEAM CONSUMPTION CURVE (FOR BFP DRIVE TURBINE)

1241

HYD

MECH

BTG-LAC-DWG-M-0373

HY-DG-391-139-0128

START UP CURVES (FOR BFP DRIVE TURBINE)

1242

HYD

Mech

BTG-LAC-DWG-M-0374

HY-DG-31890055588

ALLOWABLE FORCES, MOMENTS & THERMAL MOVEMENTS


OF BOOSTER PUMPS

ALLOWABLE FORCES, MOMENTS & THERMAL MOVEMENTS


OF MDBFP & TDBFP

1243

HYD

Mech

BTG-LAC-DWG-M-0375

HY-DG-31800055682

HYD

Mech

BTG-XXX-DWG-M-0376

VENDOR DRG NO

SECTIONAL DRAWING OF HYDRAULIC COUPLING

HYD

Mech

BTG-XXX-DWG-M-0377

VENDOR DRG NO

WORKING OIL COOLER OF HYDRAULIC COUPLING

1246

HYD

Mech

BTG-XXX-DWG-M-0378

VENDOR DRG NO

LUBE OIL COOLER OF HYDRAULIC COUPLING

1247

HYD

Mech

BTG-XXX-LIST-M-0379

HY-DG-31800055683

LIST SPECIAL TOOLS & TACKLES FOR BFP, CEP

1248

HYD

I&C

BTG-XXX-LIST-M-0380

HY-DG-41800059746

LIST OF INPUTS TO DDCMIS MDBFP

1249

HYD

Mech

BTG-XXX-DWG-M-0381

HY-DG-41800059747

DESIGN CHARACTERISTIC CURVE MDBFP SET(FLOW VS.


HEAD AT DIFF SPEEDS)

DESIGN CHARACTERISTIC CURVE TDBFP SET (FLOW VS.


HEAD AT DIFF SPEEDS)

I
I

HYD

Mech

BTG-XXX-DWG-M-0382

HY-DG-41800059748

LNTP
LNTP
NTP

I
I
I

HYD

Mech

BTG-XXX-DWG-M-0383

HY-DG-41890059650

ESTIMATED CURVE OF BP SET NPSHR (0%, 1%, 3% & 40000


HRS)

HYD

Mech

BTG-XXX-DWG-M-0384

HY-DG-41800059749

ESTIMATED CURVE OF BFP SET NPSHR (0%, 1%, 3% & 40000


HRS)

1253

HYD

Mech

BTG-XXX-DWG-M-0385

HY-DG-41810059671

ESTIMATED PERFORMANCE CURVE WITH 2 CEPS UNDER


PARALLEL

I
I

HYD

MECH

BTG-XXX-DWG-M-0386

31210000XX (Typical)

CROSS SECTION DRAWING OF DEAREATOR

1255

HYD

MECH

BTG-XXX-DWG-M-0387

2-162-01-00xxx

GENERAL ARRANGEMENT DRG OF DRAIN COOLER

1256

HYD

MECH

BTG-LCC-DWG-M-0388

2-162-22-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER #2

1257

HYD

MECH

BTG-LCC-DWG-M-0389

2-162-26-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER #3

1258

HYD

MECH

BTG-LCC-DWG-M-0390

2-162-26-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER #4

1259

HYD

MECH

BTG-XXX-DWG-M-0391

1-12-10-11xxx

GENERAL ARRANGEMENT DRG OF SPRAY CUM TRAY


DEAERATOR

1260

HYD

MECH

BTG-LAD-DWG-M-0392

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 6A

1261

HYD

MECH

BTG-LAD-DWG-M-0393

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 6B

1262

HYD

MECH

BTG-LAD-DWG-M-0394

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 7A

1263

HYD

MECH

BTG-LAD-DWG-M-0395

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 7B

1264

HYD

MECH

BTG-LAD-DWG-M-0396

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 8A

1265

HYD

MECH

BTG-LAD-DWG-M-0397

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER # 8B

1266

HYD

MECH

BTG-XXX-DWG-M-0398

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF BFPDT OIL COOLER

1267

HYD

I&C

BTG-LCC-DWG-M-0399

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #2

1268

HYD

I&C

BTG-LCC-DWG-M-0400

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #3

1269

HYD

I&C

BTG-LCC-DWG-M-0401

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #4

1270

HYD

I&C

BTG-LBQ-DWG-M-0402

3-175-01-00xxx

STAND PIPE DRAWING FOR HP HEATERS

1271

HYD

MECH

BTG-XXX-DWG-M-0403

2-12-19-11xxx

STAND PIPE ASSEMBLY DRAWIGN FOR DEAERATOR

1272

HYD

MECH

BTG-XXX-DWG-M-0404

2-12-35-11xxx

OPERAION AND MAINTENANCE PLATFORM ASSEMBLY


DRAWING FOR DEAERATOR

1273

HYD

MECH

BTG-LCC-DSH-M-0405

4-14-3202

DATA SHEET FOR LP HEATER #2

1274

HYD

MECH

BTG-LCC-DSH-M-0406

4-14-3203

1275

HYD

MECH

BTG-LCC-DSH-M-0407

4-14-3204

1276

HYD

MECH

BTG-LAD-DSH-M-0408

1277

HYD

MECH

BTG-LAD-DSH-M-0409

1278

HYD

MECH

1279

EPD

MDL

1280

EPD

1281

A
A
A
A
I
A

4-Jun-14

21-Jan-14

20-Jan-14

4 (ii)

21-Jan-14

20-Jan-14

11-Feb-14

LNTP
LNTP
LNTP

LNTP

28-Oct-13

2-Nov-13

27-Jan-14

28-Oct-13

2-Nov-13

27-Jan-14

28-Oct-13

2-Nov-13

27-Jan-14

21-May-14

4-Jun-14

21-Jul-14

28-Dec-13

21-Dec-13

24-Jan-14

21-Oct-13

25-Nov-13

27-Jan-14

LNTP

4 (i)

21-Oct-13

2-Nov-13

2 (iv)

LNTP
16-Jul-14

21-Oct-13

2-Nov-13

27-Nov-13

21-Oct-13

2-Nov-13

27-Nov-13

21-Oct-13

2-Nov-13

6-Nov-13

4-Apr-14

4-Apr-14

22-Apr-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

15-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

27-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

28-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

28-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

28-Jan-14

2 (iv)

19-Nov-13

19-Nov-13

28-Jan-14

4 weeks from
NTP

21-Dec-13

21-Dec-13

19-Feb-14

4 weeks from
NTP

29-Apr-14

24-Jun-14

21-Jul-14

4 weeks from
NTP

29-Apr-14

24-Jun-14

21-Jul-14

4 weeks from
NTP

29-Apr-14

24-Jun-14

21-Jul-14

4 weeks from
NTP

29-Apr-14

24-Jun-14

21-Jul-14

4 weeks from
NTP

19-Nov-13

19-Nov-13

15-Jan-14

4 weeks from
NTP

19-Nov-13

19-Nov-13

15-Jan-14

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

DATA SHEET FOR LP HEATER #3

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

DATA SHEET FOR LP HEATER #4

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

4-14-3205

DATA SHEET FOR HP HEATERS # 6A/B

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

4-14-3206

DATA SHEET FOR HP HEATERS # 7A/B

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

BTG-LAD-DSH-M-0410

4-14-3207

DATA SHEET FOR HP HEATERS # 8A/B

4 weeks from
NTP

4-Apr-14

4-Apr-14

16-May-14

Err:512

EP-3-MD-107-001

MASTER DRAWINGS LIST

23-Aug-13

26-Aug-13

24-Sep-13

LV SWGR

BTG-XXX-DSH-M-0411

EP-3-GN-107-001

DATA SHEET-LT SWITCHGEAR

17-Mar-14

24-Jan-14

19-Feb-14

EPD

LV SWGR

BTG-BHA-QAP-E-032

EP-3-GN-107-002

Manufacturing Quality Plan for LV SWGR

17-Mar-14

24-Jan-14

19-Feb-14

1282

EPD

LV SWGR

EP-3-GN-107-003

Manufacturing Quality Plan for LV Busduct

17-Mar-14

24-Jan-14

19-Feb-14

1283

EPD

LV SWGR

EP-3-GN-107-005

GENERAL NOTES AND FEATURES

17-Mar-14

26-Dec-13

19-Feb-14

1284

EPD

LV SWGR

EP-3-GN-107-007

LEGENDS DETAIL

17-Mar-14

24-Jan-14

19-Feb-14

1285

EPD

LV SWGR

EP-3-GN-107-009

TYPE-II CORDINATION TABLE FOR MCCB

17-Mar-14

24-Jan-14

19-Feb-14

1286

EPD

LV SWGR

EP-3-GN-107-011

TYPE TEST Reports for LV SWGR

17-Mar-14

24-Jan-14

BTG-XXX-DSH-M-0413

BTG-XXX-RPT-E-0366

A
A
I
I
I
I

I
I
A
A
A
A
I
I

2 (iv)

8 weeks from
the date of
receipt of
HBDs and
design
pressure

2 (iv)

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 2 (i)
Sl no. 2 (i)
Sl no. 1 (i)
Sl no. 2 (ii)
Sl no. 1 (i)
Sl no. 1 (i)

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

E
21-Jul-14
E

B
E
F
E
B
16-Jul-14

16-Jul-14

F
F
F

2 (iv)

2 (iv)

21-Jul-14

LNTP

4 weeks
weeks from
from
4
theNTP
date of
receipt of
HBDs and
design
pressure

13-Jun-14

13-Jun-14

15-May-14

LNTP

2 (iv)

26-May-14

LNTP
4 (i)

21-May-14

NTP
4 (i)

LNTP

4 (ii)

11-Feb-14

LNTP

4 (ii)

R3SUB_A_DT

30-May-15

56 weeks from
NTP order

4 (i)

1254

21-May-14

24-Jan-14
6-Nov-13

R2SUB_A_DT R2APP_A_DT R2APP


CAT

30-May-15

56 weeks from
NTP order

4 (i)

1252

21-Dec-13
27-Oct-13

R1SUB_A_DT R1APP_A_DT R1APP


CAT

30-May-15

56 weeks from
NTP order

4 (i)

1251

21-Jan-14
21-Oct-13

FAPP
CAT

30-May-15

56 weeks from
NTP order

6 (v)

1245

2X660 MW IB VALLEY TPS


FAPP_A_DT

Remarks

6 (v)

1244

1250

4 (i)
4 (ii)

COMP_S

20 OF 276

B
B
B
B
B
C
B
B
B
B
B
B
B

26-Apr-14

9-May-14

24-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
4-Apr-14

22-Apr-14

24-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
24-Jun-14
26-Apr-14

9-May-14

4-Apr-14

22-Apr-14

4-Apr-14

22-Apr-14

2-Jun-14

4-Jul-14

26-Apr-14

9-May-14

12-May-14

29-May-14

12-May-14

29-May-14

12-May-14

29-May-14

12-May-14

29-May-14

F
F
F
F
B
B
F
F
F
F
F
F
C
C
C
C
C
C
C

B
F

16-Jul-14
16-Jul-14
16-Jul-14
16-Jul-14
16-Jul-14
16-Jul-14
10-Oct-13

4-Nov-13

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

A
C
B
B
C
F
F

C
C
C
C

30-May-14
30-May-14
30-May-14
30-May-14

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept
1287

EPD

LV SWGR

BTG-XXX-CAL-E-0364

EP-3-GN-107-013

SHORT CIRCUIT CALUCLATIONS

1288

EPD

LV SWGR

BTG-XXX-CAL-E-0367

EP-3-GN-107-014

Bus Bar Calculations for LV SWGR

1289

EPD

LV SWGR

BTG-XXX-CAL-E-0365

EP-3-GN-107-016

BURDEN SIZING CALUCLATIONS

1290

EPD

LV SWGR

BTG-XXX-DSH-E-0369

EP-3-GN-107-017

Module Sizes

1291

EPD

LV SWGR

BTG-CBA-DWG-E-0370

EP-3-GA-107-301

415V, 3200A, 3PHASE, 50HZ UNIT PCC

1292

EPD

LV SWGR

BTG-CBA-DWG-E-0371

EP-3-GA-107-302

415V, 4000A, 3PHASE, 50HZ STATION UNIT SERVICE PCC

1293

EPD

LV SWGR

BTG-CBA-DWG-E-0372

EP-3-GA-107-303

415V, 1250A, 3PHASE, 50HZ TURBINE MCC

1294

EPD

LV SWGR

BTG-BHA-DWG-E-0373

EP-3-GA-107-304

415V, 3200A, 3PHASE, 50HZ EMERGENCY MCC

1295

EPD

LV SWGR

BTG-BHA-DWG-E-0374

EP-3-GA-107-305

415V, 3PHASE, 50HZ TURBINE VALVE ACDB

1296

EPD

LV SWGR

BTG-BHA-DWG-E-0375

EP-3-GA-107-306

415V, 3PHASE, 50HZ SERVICE ACDB

1297

EPD

LV SWGR

BTG-CBA-DWG-E-0376

EP-3-GA-107-307

220V MAIN DCDB

1298

EPD

LV SWGR

BTG-CBA-DWG-E-0377

EP-3-GA-107-308

415V, 800A, 3PHASE, 50HZ BOILER SERVICE MCC

1299

EPD

LV SWGR

BTG-CBA-DWG-E-0378

EP-3-GA-107-309

415V, 1000A, 3PHASE, 50HZ AC & VENTILATION MCC

1300

EPD

LV SWGR

BTG-CBA-DWG-E-0379

EP-3-GA-107-310

415V, 630A, 3PHASE, 50HZ MISC SERVICE MCC

1301

EPD

LV SWGR

BTG-CBA-DWG-E-0380

EP-3-GA-107-311

415V, 250A, 3PHASE, 50HZ BOILER VALVE & DAMPER ACDB

1302

EPD

LV SWGR

BTG-BHA-DWG-E-0381

EP-3-GA-107-312

415V, 400A, 3PHASE, 50HZ ESP & ID FAN MCC

1303

EPD

LV SWGR

BTG-BHA-DWG-E-0382

EP-3-GA-107-313

415V, 400A, 3PHASE, 50HZ ESP AC & VENTILATION MCC

1304

EPD

LV SWGR

BTG-CBA-DWG-E-0383

EP-3-SL-107-301

415V, 3200A, 3PHASE, 50HZ UNIT PCC

1305

EPD

LV SWGR

BTG-CBA-DWG-E-0384

EP-3-SL-107-302

415V, 4000A, 3PHASE, 50HZ STATION UNIT SERVICE PCC

1306

EPD

LV SWGR

BTG-BHA-DWG-E-0385

EP-3-SL-107-303

415V, 1250A, 3PHASE, 50HZ TURBINE MCC

1307

EPD

LV SWGR

BTG-BHA-DWG-E-0386

EP-3-SL-107-304

415V, 3200A, 3PHASE, 50HZ EMERGENCY MCC

1308

EPD

LV SWGR

BTG-BHA-DWG-E-0387

EP-3-SL-107-305

415V, 3PHASE, 50HZ TURBINE VALVE ACDB

1309

EPD

LV SWGR

BTG-BHA-DWG-E-0388

EP-3-SL-107-306

415V, 3PHASE, 50HZ SERVICE ACDB

1310

EPD

LV SWGR

BTG-BHA-DWG-E-0389

EP-3-SL-107-307

220V MAIN DCDB

1311

EPD

LV SWGR

BTG-BHA-DWG-E-0390

EP-3-SL-107-308

415V, 800A, 3PHASE, 50HZ BOILER SERVICE MCC

1312

EPD

LV SWGR

BTG-BHA-DWG-E-0391

EP-3-SL-107-309

415V, 1000A, 3PHASE, 50HZ AC & VENTILATION MCC

1313

EPD

LV SWGR

BTG-BHA-DWG-E-0392

EP-3-SL-107-310

415V, 630A, 3PHASE, 50HZ MISC SERVICE MCC

1314

EPD

LV SWGR

BTG-BHA-DWG-E-0393

EP-3-SL-107-311

415V, 250A, 3PHASE, 50HZ BOILER VALVE & DAMPER ACDB

1315

EPD

LV SWGR

BTG-BHA-DWG-E-0394

EP-3-SL-107-312

415V, 400A, 3PHASE, 50HZ ESP & ID FAN MCC

1316

EPD

LV SWGR

BTG-BHA-DWG-E-0395

EP-3-SL-107-313

415V, 400A, 3PHASE, 50HZ ESP AC & VENTILATION MCC

1317

EPD

LV SWGR

BTG-BHA-DWG-E-0396

EP-3-GA-107-401

415V, 3200A, 3PHASE, 50HZ UNIT PCC

1318

EPD

LV SWGR

BTG-BHA-DWG-E-0397

EP-3-GA-107-402

415V, 4000A, 3PHASE, 50HZ STATION UNIT SERVICE PCC

1319

EPD

LV SWGR

BTG-BHA-DWG-E-0398

EP-3-GA-107-403

415V, 1250A, 3PHASE, 50HZ TURBINE MCC

1320

EPD

LV SWGR

BTG-BHA-DWG-E-0399

EP-3-GA-107-404

415V, 3200A, 3PHASE, 50HZ EMERGENCY MCC

1321

EPD

LV SWGR

BTG-BHA-DWG-E-0400

EP-3-GA-107-405

415V, 3PHASE, 50HZ TURBINE VALVE ACDB

1322

EPD

LV SWGR

BTG-BHA-DWG-E-0401

EP-3-GA-107-406

415V, 3PHASE, 50HZ SERVICE ACDB

1323

EPD

LV SWGR

BTG-BHA-DWG-E-0402

EP-3-GA-107-407

220V MAIN DCDB

1324

EPD

LV SWGR

BTG-BHA-DWG-E-0403

EP-3-GA-107-408

415V, 800A, 3PHASE, 50HZ BOILER SERVICE MCC

1325

EPD

LV SWGR

BTG-BHA-DWG-E-0404

EP-3-GA-107-409

415V, 1000A, 3PHASE, 50HZ AC & VENTILATION MCC

1326

EPD

LV SWGR

BTG-BHA-DWG-E-0405

EP-3-GA-107-410

415V, 630A, 3PHASE, 50HZ MISC SERVICE MCC

1327

EPD

LV SWGR

BTG-BHA-DWG-E-0406

EP-3-GA-107-411

415V, 250A, 3PHASE, 50HZ BOILER VALVE & DAMPER ACDB

1328

EPD

LV SWGR

BTG-BHA-DWG-E-0407

EP-3-GA-107-412

415V, 400A, 3PHASE, 50HZ ESP & ID FAN MCC

1329

EPD

LV SWGR

BTG-BHA-DWG-E-0408

EP-3-GA-107-413

415V, 400A, 3PHASE, 50HZ ESP AC & VENTILATION MCC

1330

EPD

LV SWGR

BTG-BHA-DWG-E-0409

EP-3-SL-107-401

415V, 3200A, 3PHASE, 50HZ UNIT PCC

1331

EPD

LV SWGR

BTG-BHA-DWG-E-0410

EP-3-SL-107-402

415V, 4000A, 3PHASE, 50HZ STATION UNIT SERVICE PCC

1332

EPD

LV SWGR

BTG-BHA-DWG-E-0411

EP-3-SL-107-403

415V, 1250A, 3PHASE, 50HZ TURBINE MCC

1333

EPD

LV SWGR

BTG-BHA-DWG-E-0412

EP-3-SL-107-404

415V, 3200A, 3PHASE, 50HZ EMERGENCY MCC

1334

EPD

LV SWGR

BTG-BHA-DWG-E-0413

EP-3-SL-107-405

415V, 3PHASE, 50HZ TURBINE VALVE ACDB

1335

EPD

LV SWGR

BTG-BHA-DWG-E-0414

EP-3-SL-107-406

415V, 3PHASE, 50HZ SERVICE ACDB

1336

EPD

LV SWGR

BTG-BHA-DWG-E-0415

EP-3-SL-107-407

220V MAIN DCDB

1337

EPD

LV SWGR

BTG-BHA-DWG-E-0416

EP-3-SL-107-408

415V, 800A, 3PHASE, 50HZ BOILER SERVICE MCC

1338

EPD

LV SWGR

BTG-BMA-DSH-E-0417

EP-3-SL-107-409

415V, 1000A, 3PHASE, 50HZ AC & VENTILATION MCC

1339

EPD

LV SWGR

BTG-BHA-DWG-E-0418

EP-3-SL-107-410

415V, 630A, 3PHASE, 50HZ MISC SERVICE MCC

1340

EPD

LV SWGR

BTG-BHA-DWG-E-0419

EP-3-SL-107-411

415V, 250A, 3PHASE, 50HZ BOILER VALVE & DAMPER ACDB

1341

EPD

LV SWGR

BTG-BHA-DWG-E-0420

EP-3-SL-107-412

415V, 400A, 3PHASE, 50HZ ESP & ID FAN MCC

LNTP
Purpose reference
(I/ A)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)

COMP_S

COMP_A

2X660 MW IB VALLEY TPS

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

17-Mar-14

24-Jan-14

19-Feb-14

17-Mar-14

24-Jan-14

19-Feb-14

17-Mar-14

25-Jan-14

19-Feb-14

Remarks
LNTP
NTP
LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FAPP
CAT
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT
7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

7-Mar-14

6-Apr-14

17-Mar-14

12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15

21 OF 276

C
C

F
F

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER
DRAWING
LIST
COMP_A
FSUB_S_DT
FSUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

1342

EPD

LV SWGR

BTG-BHA-DWG-E-0421

EP-3-SL-107-413

415V, 400A, 3PHASE, 50HZ ESP AC & VENTILATION MCC

1343

EPD

LV SWGR

BTG-BHA-DWG-E-0422

EP-3-GA-107-001

415V, 1000A, 3PHASE, 50HZ CCR AC MCC

1344

EPD

LV SWGR

BTG-BHA-DWG-E-0423

EP-3-GA-107-002

415V, 400A, 3PHASE, 50HZ CPU REGENERATING MCC

1345

EPD

LV SWGR

BTG-BHA-DWG-E-0424

EP-3-GA-107-003

240V AC MCB DB

1346

EPD

LV SWGR

BTG-BMA-DWG-E-0425

EP-3-GA-107-004

220V DC MCB DB

1347

EPD

LV SWGR

BTG-BMA-DWG-E-0426

EP-3-GA-107-005

0.37KW MOTOR LOCAL MOTOR STARTER

1348

EPD

LV SWGR

BTG-BHA-DWG-E-0427

EP-3-GA-107-006

0.55KW MOTOR LOCAL MOTOR STARTER

1349

EPD

LV SWGR

BTG-BHA-DWG-E-0428

EP-3-GA-107-007

0.75KW MOTOR LOCAL MOTOR STARTER

1350

EPD

LV SWGR

BTG-BHA-DWG-E-0429

EP-3-GA-107-008

1.10KW MOTOR LOCAL MOTOR STARTER

1351

EPD

LV SWGR

BTG-BHA-DWG-E-0430

EP-3-GA-107-009

1.50KW MOTOR LOCAL MOTOR STARTER

1352

EPD

LV SWGR

BTG-BHR-DWG-E-0431

EP-3-GA-107-010

2.20KW MOTOR LOCAL MOTOR STARTER

1353

EPD

LV SWGR

BTG-BHR-DWG-E-0432

EP-3-GA-107-011

3.70KW MOTOR LOCAL MOTOR STARTER

1354

EPD

LV SWGR

BTG-BLA-DWG-E-0433

EP-3-GA-107-012

TYPE-A PUSH BUTTON STATION FOR EMERGENCY STOP

1355

EPD

LV SWGR

BTG-BLA-DWG-E-0434

EP-3-GA-107-013

TYPE-B PUSH BUTTON STATION FOR STOP & START

1356

EPD

LV SWGR

BTG-BLA-DWG-E-0435

EP-3-GA-107-014

DATA CONCENTRATOR SYSTEM

1357

EPD

LV SWGR

BTG-BLA-DWG-E-0436

EP-3-SL-107-001

415V, 1000A, 3PHASE, 50HZ CCR AC MCC

1358

EPD

LV SWGR

BTG-BHR-DWG-E-0437

EP-3-SL-107-002

415V, 400A, 3PHASE, 50HZ CPU REGENERATING MCC

1359

EPD

LV SWGR

BTG-BHR-DWG-E-0438

EP-3-SL-107-003

240V AC MCB DB

1360

EPD

LV SWGR

BTG-BLA-DWG-E-0439

EP-3-SL-107-004

220V DC MCB DB

1361

EPD

LV SWGR

BTG-BLA-DWG-E-0440

EP-3-CS-107-001

ESP & ID FAN AREA mcc/UNIT SERVICE PMCC INCOMER-1

1362

EPD

LV SWGR

BTG-BLA-DWG-E-0441

EP-3-CS-107-002

ESP & ID FAN AREA mcc/UNIT SERVICE PMCC INCOMER-2

1363

EPD

LV SWGR

BTG-BLA-DWG-E-0442

EP-3-CS-107-003

PMCC/MCC BUSCOUPLER

1364

EPD

LV SWGR

BTG-BLA-DWG-E-0443

EP-3-CS-107-004

PMCC/MCC INCOMER-1

1365

EPD

LV SWGR

BTG-BLA-DWG-E-0444

EP-3-CS-107-005

PMCC/MCC INCOMER-2

1366

EPD

LV SWGR

BTG-BLA-DWG-E-0445

EP-3-CS-107-006

EMERGENCY INCOMER FROM DG TO EMERGENCY BOARD

1367

EPD

LV SWGR

BTG-BLA-DWG-E-0446

EP-3-CS-107-007

TIE TO EMERGENCY MCC

1368

EPD

LV SWGR

BTG-BLA-DWG-E-0447

EP-3-CS-107-008

STANDBY EMERGENCY INCOMER FROM STANDBY DG TO


EMERGENCY BOARD

1369

EPD

LV SWGR

BTG-BLA-DWG-E-0448

EP-3-CS-107-009

BUSCOUPLER FOR EMERGENCY MCC

1370

EPD

LV SWGR

BTG-BUA-DWG-E-0449

EP-3-CS-107-010

EMERGENCY MCC NORMAL INCOMER-1

1371

EPD

LV SWGR

BTG-BUA-DWG-E-0450

EP-3-CS-107-011

EMERGENCY MCC NORMAL INCOMER-2

1372

EPD

LV SWGR

BTG-BLA-DWG-E-0451

EP-3-CS-107-012

OUTGOING BREAKER FEEDER

1373

EPD

LV SWGR

BTG-BLA-DWG-E-0452

EP-3-CS-107-013

BELOW 250A CONTACTOR CONTROLLED MCCB INCOMER

1374

EPD

LV SWGR

BTG-BLA-DWG-E-0453

EP-3-CS-107-015

MCCB INCOMER

1375

EPD

LV SWGR

BTG-BLA-DWG-E-0454

EP-3-CS-107-016

MCCB BUSCOUPLER

1376

EPD

LV SWGR

BTG-BHR-DWG-E-0455

EP-3-CS-107-017

TPN MCCB OUTGOING

1377

EPD

LV SWGR

BTG-BHR-DWG-E-0466

EP-3-CS-107-018

SINGLE PHASE MCCB OUTGOING

1378

EPD

LV SWGR

BTG-BHA-DWG-E-0457

EP-3-CS-107-019

TPN CONTACTOR CONTROLLED MCCB OUTGOING

1379

EPD

LV SWGR

BTG-BHA-DWG-E-0458

EP-3-CS-107-020

SINGLE PHASE CONTACTOR CONTROLLED MCCB OUTGOING

1380

EPD

LV SWGR

BTG-BHA-DWG-E-0459

EP-3-CS-107-021

220V DC UPTO 1000A INCOMER FROM BATTERY (DB&CH)

1381

EPD

LV SWGR

BTG-BHA-DWG-E-0460

EP-3-CS-107-022

220V DC UPTO 250A INCOMER

1382

EPD

LV SWGR

BTG-BMA-DWG-E-0461

EP-3-CS-107-023

220V DC BUSCOUPLER

1383

EPD

LV SWGR

BTG-BMA-DWG-E-0462

EP-3-CS-107-024

220V DCDB BUS VOLTAGE MODULE FOR METERING &


PROTECTION

1384

EPD

LV SWGR

BTG-BHA-DWG-E-042

EP-3-CS-107-025

220V DC UPTO 200A OUTGOING FEEDER

1385

EPD

LV SWGR

BTG-BHA-DWG-E-0464

EP-3-CS-107-026

220V DC SOLENOID VALVE FEEDER

1386

EPD

LV SWGR

BTG-BHA-DWG-E-0465

EP-3-CS-107-027

INCLUDING 110KW & ABOVE UPTO 160KW BREAKER


CONTROLLED MOTOR FEEDER

1387

EPD

LV SWGR

BTG-BHA-DWG-E-0466

EP-3-CS-107-028

BELOW 30KW UNIDIRECTIONAL MOTOR FEEDER


CONTROLLED FROM ATRS/DDCMIS/PLC

BELOW 30KW CRITICAL UNIDIRECTIONAL MOTOR FEEDER


CONTROLLED FROM ATRS/DDCMIS/PLC

1388

1389

1390

1391

EPD

EPD

EPD

EPD

LV SWGR

LV SWGR

LV SWGR

LV SWGR

BTG-BHR-DWG-E-0467

BTG-BHR-DWG-E-0468

BTG-BLA-DWG-E-0469

BTG-BLA-DWG-E-0470

EP-3-CS-107-029

EP-3-CS-107-030

EP-3-CS-107-031

EP-3-CS-107-032

BELOW 30KW (WITH REACCELERATION)UNIDIRECTIONAL


MOTOR FEEDER CONTROLLED FROM ATRS/DDCMIS/PLC

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

EP-3-CS-107-033

220V DC CONTROL SUPPLY OUTGOING

1393

EPD

LV SWGR

BTG-BLA-DWG-E-0472

EP-3-CS-107-034

BUS PT MODULE FOR NON BREAKER BOARDS

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15

12-Mar-15
NTP
12-Mar-15
NTP
12-Mar-15
NTP

Sl no. 2 (ii)

12-Mar-15

12-Mar-15

Sl no. 2 (ii)

12-Mar-15

NTP

Sl no. 2 (ii)

BTG-BLA-DWG-E-0471

Sl no. 2 (ii)

ABOVE 30KW & BELOW 110KW (WITH


REACCELERATION)UNIDIRECTIONAL MOTOR FEEDER
CONTROLLED FROM ATRS/DDCMIS/PLC

LV SWGR

Sl no. 2 (ii)

NTP

Sl no. 2 (ii)

EPD

Sl no. 2 (ii)

Remarks

Sl no. 2 (ii)

ABOVE 30KW & BELOW 110KW UNIDIRECTIONAL MOTOR


FEEDER CONTROLLED FROM ATRS/DDCMIS/PLC

1392

Sl no. 2 (ii)

COMP_S

12-Mar-15
NTP

Sl no. 2 (ii)
Sl no. 2 (ii)

NTP
NTP

12-Mar-15
12-Mar-15

22 OF 276

2X660 MW IB VALLEY TPS


FAPP_A_DT

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

SL No.

MU /PEM System/ group

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

LNTP
Purpose reference
(I/ A)

EPD

LV SWGR

BTG-BLA-DWG-E-0473

EP-3-CS-107-035

BUS PT MODULE FOR EMERGENCY MCC

1395

EPD

LV SWGR

BTG-BLA-DWG-E-0474

EP-3-CS-107-036

220V DC CONTROL SUPPLY MODULE IN BUSCOUPLER


MODULE

1396

EPD

LV SWGR

BTG-BLA-DWG-E-0475

EP-3-CS-107-037

SPACE HEATER MODULE

1397

EPD

LV SWGR

BTG-BLA-DWG-E-0476

EP-3-CS-107-038

SPACE HEATER & SWITCH SOCKET

1398

EPD

LV SWGR

BTG-BLA-DWG-E-0477

EP-3-CS-107-039

BUS PT MODULE FOR PCC/MCC

1399

EPD

LV SWGR

BTG-BLA-DWG-E-0478

EP-3-CS-107-321

415V, 3200A, 3PHASE, 50HZ UNIT PCC-3DA

1400

EPD

LV SWGR

BTG-BLA-DWG-E-0479

EP-3-CS-107-322

415V, 3200A, 3PHASE, 50HZ STATION SERVICE PCC-0DA

1401

EPD

LV SWGR

BTG-BLA-DWG-E-0480

EP-3-CS-107-323

LT MCC-3DB

1402

EPD

LV SWGR

BTG-BUA-DWG-E-0481

EP-3-CS-107-324

LT MCC-3DC

1403

EPD

LV SWGR

BTG-BUA-DWG-E-0482

EP-3-CS-107-325

LT MCC-3DD

1404

EPD

LV SWGR

BTG-BLA-DWG-E-0483

EP-3-CS-107-326

LT MCC-3DE

1405

EPD

LV SWGR

BTG-BLA-DWG-E-0484

EP-3-CS-107-421

415V, 3200A, 3PHASE, 50HZ UNIT PCC-4DA

1406

EPD

LV SWGR

BTG-BHR-DWG-E-0485

EP-3-CS-107-422

415V, 3200A, 3PHASE, 50HZ STATION SERVICE PCC-0DB

1407

EPD

LV SWGR

BTG-BHR-DWG-E-0486

EP-3-CS-107-423

LT MCC-4DB

1408

EPD

LV SWGR

BTG-BHA-DWG-E-0487

EP-3-CS-107-424

LT MCC-4DC

1409

EPD

LV SWGR

BTG-BHA-DWG-E-0488

EP-3-CS-107-425

LT MCC-4DD

1410

EPD

LV SWGR

BTG-BHA-DWG-E-0489

EP-3-CS-107-426

LT MCC-4DE

1411

ISG

MDL

BTG-BRV-LIST-E-0489

ISG-679-MDL-001

MASTER DRAWING LIST ISG- 3 X 1750KVA DG SETS

1412
1413
1414
1415
1416

ISG
ISG
ISG
ISG
ISG

DG SET
DG SET
DG SET
DG SET
DG SET

BTG-XXX-DSH-M-0414
BTG-BRV-DSH-E-0490
BTG-BRV-DSH-E-0491
BTG-BRV-DSH-E-0492
BTG-XXX-DSH-M-0415

IS-4-DS-679-800-A001
IS-4-DS-679-800-A002
IS-4-DS-679-800-A003
IS-4-DS-679-800-A004
IS-4-DS-679-800-A005

DATA SHEET FOR ENGINE


DATA SHEET FOR ALTERNATOR
DATA SHEET FOR DG SET
DATA SHEET OF BATTERY
DATA SHEET OF EXHAUST & FUEL SYSTEM PIPE

A
A
A
A
A

NTP
NTP
NTP
NTP

1417
1418
1419
1420
1421
1422
1423
1424

ISG
ISG
ISG
ISG
ISG
ISG
ISG
ISG

DG SET
DG SET
DG SET
DG SET
DG SET
DG SET
DG SET
DG SET

BTG-XXX-DWG-M-0458
BTG-BRV-DWG-E-0493
BTG-PRV-DWG-M-0459
BTG-BRV-DWG-E-0494
BTG-BRV-DWG-E-0495
BTG-HJF-DWG-M-0416
BTG-XXX-DWG-S-0081
BTG-UNY-DWG-S-0082

IS-3-GA-679-800-A001
IS-3-GA-679-800-A002
IS-3-GA-679-800-A003
IS-3-GA-679-800-A004
IS-3-GA-679-800-A005
IS-3-GA-679-800-A007
IS-3-GA-679-800-A008
IS-2-GA-679-800-A009

GA DRAWING OF ENGINE
GA DRAWING OF ALTERNATOR
GA DRAWING OF DG SET
GA OF LOAD SIDE TERMINAL BOX
GA OF NEUTRAL SIDE TERMINAL BOX
GA OF FUEL TANK (990Ltrs.)
GA OF BASE FRAME
GA OF EXHAUST PIPE SUPPORT STRUCTURE

I
I
I
I
I
A
I
A

NTP
NTP
NTP
NTP
NTP
NTP
NTP

1425

ISG

DG SET

BTG-UMC-DWG-S-0083

IS-3-DG-679-800-A010

FOUNDATION PLAN FOR DG

1426
1427

ISG
ISG

DG SET
DG SET

BTG-XXX-DWG-E-0520
BTG-BRV-DWG-E-0521

IS-3-DG-679-800-A011
IS-3-MS-679-800-A001

LAYOUT PLAN FOR 3 X 1750KVA DG SETS


GA, SCHEMATIC & BILL OF MATERIALS FOR AMF PANEL

A
A

1428

ISG

DG SET

BTG-BRV-DWG-E-0496

IS-3-MS-679-800-A002

GA, SCHEMATIC & BILL OF MATERIALS FOR AUXILIARY


DISTRIBUTION BOARD

1429

ISG

DG SET

BTG-BRV-DWG-E-0497

IS-3-MS-679-800-A003

GA, BILL OF MATERIALS FOR POWER BUSBAR PANEL

1430

ISG

DG SET

BTG-BRV-DWG-E-0498

IS-3-MS-679-800-A005

GA, SCHEMATIC & BILL OF MATERIALS FOR BATTERY


CHARGER PANEL

1431
1432
1433

ISG
ISG
ISG

DG SET
DG SET
DG SET

BTG-BRV-QAP-E-0499
BTG-XXX-QAP-I-0146
Err:512

IS-4-QP-679-800-A001
IS-4-QP-679-800-A002
IS-4-OM-679-800-A001

QAP OF DG SET
QAP OF CONTROL PANELS
O & M MANUAL

A
A
I

A
A
A
A
I
I
I
I
I
I
I
I
I
I
I
I
A

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
1 (i)

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Aug-13

24-Sep-13

Remarks

1394

Sl no. 2 (ii)

COMP_S

2X660 MW IB VALLEY TPS

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
LNTP

NTP

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
28-Aug-13
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
4-May-15
4-May-15
4-May-15
4-May-15
6-Apr-15
4-May-15
4-Jan-16

23 OF 276

10-Oct-13

4-Nov-13

R2SUB_A_DT R2APP_A_DT R2APP


CAT

R3SUB_A_DT

R3APP_A_DT

R3APP CAT

R4SUB_A_DT R4APP_A_DT R4APP


CAT

R5SUB_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

24 OF 276

2X660 MW IB VALLEY TPS

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

25 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

9-Jun-14

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

26 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

10-Apr-14

19-Apr-14

5-Jul-14

REL_FOR_CO
NST

MASTER DRAWING LIST

27 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

28 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

28-May-14

30-May-14

13-Jun-14

REL_FOR_CO
NST

MASTER DRAWING LIST

29 OF 276

2X660 MW IB VALLEY TPS

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

30 OF 276

2X660 MW IB VALLEY TPS

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

31 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

32 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

33 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

34 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

35 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

36 OF 276

2X660 MW IB VALLEY TPS

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

37 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

Document
added
Document
added
Document
added
Document
added

Document
added
Document
added
Document
added
Document
added
Document
added
Document
added

38 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

39 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

40 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

41 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

42 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

43 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

44 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

MASTER DRAWING LIST

45 OF 276

2X660 MW IB VALLEY TPS

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

R5APP_A_DT R5APP CAT

R6SUB_A_DT R6APP_A_DT R6APP CAT

REL_FOR_CO
NST

46 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

47 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

MASTER DRAWING LIST

FINAL_DIST_ CAT
DT

48 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

49 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

50 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

51 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

52 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

MASTER DRAWING LIST

FINAL_DIST_ CAT
DT

53 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

MASTER DRAWING LIST

FINAL_DIST_ CAT
DT

54 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

55 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

56 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

57 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

58 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

59 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

MASTER DRAWING LIST

FINAL_DIST_ CAT
DT

60 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

61 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

62 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

63 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

64 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

65 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

66 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

67 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


REV_NO

REMARKS

AB_REQD

FINAL_DIST_ CAT
DT

MASTER DRAWING LIST

68 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

REV_NO

REMARKS

AB_REQD

MASTER DRAWING LIST

FINAL_DIST_ CAT
DT

69 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

MASTER DRAWING LIST-TRY


QUALITY PLAN
Painting Schedule
SB MCC SINGLE LINE DIAGRAM

Dept

1
2
3
4

TRY
TRY
TRY
TRY

MDL
Boiler
Boiler
Boiler

Err:512
Err:512
BTG-XXX-SCH-M-0001
BTG-BLA-DWG-E-0001

40-SCH-MDL-001

TRY

Boiler

BTG-HAC-DWG-M-0002

0-00-047-48526

10

TRY

TRY

TRY

TRY

TRY

Boiler

Boiler

Boiler

Boiler

Boiler

2X660 MW IB VALLEY TPS

BTG-HAD-DWG-M-0003

BTG-HAH-DWG-M-0004

BTG-HAJ-DWG-M-0005

BTG-HAG-DWG-M-0006

BTG-HCB-SCH-M-0007

PL: C3 - PS / 1713
3-96-186-14356 to
3-96-186-14368

0-00-047-48527

0-00-047-48528

0-00-047-48529

0-00-047-48530

4-00-047-75832

SCHEME OF START-UP & ECONOMISER


CIRCUIT WITH VALVES, FITTINGS AND
INSTRUMENTATIONS

LNTP
Purpose reference
(I/ A)
I
A
A
A

2 (vi)
A

SCHEME OF EVOPARATOR & SEPARATOR


CIRCUIT WITH VALVES, FITTINGS AND
INSTRUMENTATIONS

SCHEME OF SUPER-HEATER CIRCUIT WITH


VLAVES, FITTINGS AND INSTRUMENTATIONS

SCHEME OF RE-HEATER CIRCUIT WITH


VLAVES, FITTINGS AND INSTRUMENTATIONS

2 (vi)

2 (vi)

2 (vi)

SCHEME OF BOILER WATER CIRCULATING


PUMP WITH VALVES, FITTINGS AND
INSTRUMENTATIONS

VALVES SCHEDULE FOR WATER, STEAM,


CIRCULATING PUMPS AND SB SYSTEMS

2 (vi)

2 (vi)

11

TRY

Boiler

BTG-XXX-DWG-M-0425

1-97-291-90591

SCHEME OF PULVERISER SYSTEM WITH


INSTRUMENTATION

12

TRY

Boiler

BTG-XXX-DWG-M-0426

0-97-288-90873
0-97-288-90874

SCHEME OF AIR & FLUE GAS SYSTEM WITH


INSTRUMENTATION

13

TRY

Boiler

BTG-HJF-DWG-M-0427

0-00-056-11034

SCHEME OF FUEL OIL AND GAS WITH


INSTRUMENTATION

14

TRY

Boiler

BTG-XXX-SCH-M-0008

FS/1713-1714/VLV_SCH

SCHEDULE OF VALVES AND FITTINGS

15

TRY

Boiler

BTG-XXX-DWG-M-0428

0-00-047-48531

SCHEME OF SOOT BLOWER PIPING WITH


VALVES, FITTINGS AND INSTRUMENTATION

16

TRY

Boiler

BTG-HBK-DWG-M-0009

0-00-020-76298

KEY PLAN OF BOILER

17

TRY

Boiler

BTG-HBK-DWG-M-0010

0-00-022-76299 to
0-00-022-76304

GA OF BOILER SECTIONAL ELEVATION AND


PLAN

70 OF 276

1 (i)
2 (i)
2 (i)
2 (ii)

2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vi)

A
A
A

2 (vii)
2 (vii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

18

TRY

Boiler

BTG-HNC-DWG-M-0011

0-00-020-76315
0-00-020-76316

LAYOUT OF ID SYSTEM

19

TRY

Boiler

BTG-UHA-DWG-M-0417

0-00-022-76301

GA OF BOILER FRONT ELEVATION

20

TRY

Boiler

BTG-UHB-DWG-M-0418

3-00-020-70182

BOILER EQUIPMENT DESIGNATION

21

TRY

Boiler

BTG-HBK-DSH-M-0012

CPT-1101

BOILER PERFORMANCE PARAMETER

22
23
24

TRY
TRY
TRY

Boiler
Boiler
Boiler

BTG-XXX-DSH-M-0013
BTG-XXX-DSH-M-0014
BTG-LA-QAP-M-0015

CPT-1102
CPT-1103
CPT-1215

FUEL ANALYSIS
SITE CONDITION
RECOMMENDED QUALITY OF FEED WATER

25

TRY

Boiler

BTG-HBK-DSH-M-0016

CPT-1806

ANTICIPATED PERFORMANCE DATA FOR


BOILER

26

TRY

Boiler

BTG-HBK-CAL-M-0017

BCR-1011

FURNACE PERFORMANCE & SIZING


CALCULATIONS

27

TRY

Boiler

BTG-HA-DSH-M-0018

BCR-1014

SH/RH/ECO PERFORMANCE / ARRANGEMENT


SKETCH/DATA ALONG WITH MATERIAL
DETAILS

28

TRY

Boiler

BTG-UHB-DWG-S-0001

0-00-281-26347
0-00-281-26253

BOILER FOUNDATION PLAN

29

TRY

Boiler

BTG-UMC-DWG-S-0002

0-00-291-26261
0-00-291-26262
0-00-291-26358
1-00-291-01010

FOUNDATION PLAN-ID SYSTEM SUPP


STRUCTURE

30

TRY

Boiler

BTG-HDA-DSH-M-0019

CPT- 1305

ASH COLLECTION DATA FOR BOILER

31

TRY

Boiler

BTG-HLB-CAL-M-0020

BCR-1023

FD FAN SIZING CALCULATION & PER CURVES

32

TRY

Boiler

BTG-HNC-CAL-M-0021

BCR-1024

ID FAN SIZING CALCULATION & PER CURVES

33

TRY

Boiler

BTG-HFE-CAL-M-0023

BCR-1025

PA FAN SIZING CALCULATION & PER CURVES

34
35
36

TRY
TRY
TRY

Boiler
Boiler
Boiler

BTG-HLD-DSH-M-0024
BTG-HFC-CAL-M-0025
BTG-XXX-CAL-M-0026

BCR-1027
BCR-1030
BCR- 1005

AIR PREHEATER EQUIPMENT DATA


MILL SIZING CALCULATION
DUCT DESIGN DATA AND CALCULATION

37

TRY

Boiler

BTG-XXX-DSH-M-0429

BCR- 1016

SAFETY VALVE SIZING & SELECTION

38

TRY

Boiler

BTG-HBK-DSH-M-0027

2-00-056-10391

BOILER AREA- TERMINAL POINT DETAILS

71 OF 276

A
A
A
I
I
I
I

2 (vii)
2 (vii)
2 (vii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)
3 (iii)

3 (v)
3 (v)

I
A
A
A
I
I
I
I
I

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

39

TRY

Boiler

BTG-HBK-DSH-M-0028

1-00-201-06929

TP DETAILS-FURNACE BOTTOM SEAL PLATE


ASY

40

TRY

Boiler

BTG-HFC-DWG-M-0419

0-43-000-00637

MILL PLANT ARRANGEMENT

41

TRY

Boiler

BTG-ERA-DWG-M-0029

0-47-260-02488
2-47-260-01719

LAYOUT OF PULVERISED FUEL PIPING

42

TRY

Boiler

BTG-HBK-DWG-M-0030

0-00-021-76317 to
0-00-021-76341

BOILER FLOOR PLAN ARRANGEMENT

43

TRY

Boiler

BTG-UFG-DWG-S-0003

LNTP
Purpose reference
(I/ A)
I
A
I
I

Boiler structure fabrication drawing (tier 1 & 2)


ready for release for fabrication

44

TRY

Boiler

BTG-XXX-DWG-S-0004

Bunker bay structure fabrication drawing ready for


release for fabrication

45
46

TRY
TRY

Boiler
Boiler

Err:512
BTG-XXX-DWG-M-0031

O & M MANUAL
PERFORMACE GAURANTEE TEST
PROCEDURE

I
A

47

TRY

Boiler

BTG-HFC-DSH-M-0032

3-97-291-94301

M & C RECOMMENDATIONS - PULVERISER


SYSTEM

48

TRY

Boiler

BTG-HBK-DWG-M-0033

CPT-1801

BOILER PERFORMANCE CURVES

49

TRY

Boiler

BTG-XXX-DWG-M-0034

CPT-1804

COMBINED BOILER TURBINE START UP


CURVES

50
51

TRY
TRY

Boiler
Boiler

BTG-HCB-PCD-I-0001
BTG-HBK-DWG-I-0002

CI: 1713: SBC


1-95-094-11263 to
1-95-094-11307

SB CONTROL WRITE UP
FSSS LOGIC DRAWINGS

I
I

72 OF 276

4 (ii)
4 (ii)
4 (ii)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)
I

Dept

52

TRY

Boiler

BTG-HLA-DWG-I-0003

2-95-194-03515 to
2-95-194-03522

SADC CONTROL SCHEME AND WRITEUP

53

TRY

Boiler

Err:512

3-97-591-94302

M & C RECOMMENDATIONS-STM & WTR.- BLR I

54

TRY

Boiler

BTG-HJF-DSH-M-0035

3-97-291-94300

M & C RECOMMENDATIONS - FUEL OIL


SYSTEM

55

TRY

Boiler

BTG-XXX-DWG-M-0036

3-97-291-94299

M & C RECOMMENDATIONS - AIR & FLUE GAS I


SYSTEM

56

TRY

Boiler

BTG-XXX-DWG-M-0037

0-00-027-46666 to
0-00-027-46668

PPA - GENRAL ARRANGEMENT OF PRESSURE I


PARTS

57

TRY

Boiler

BTG-QHF-DWG-M-0038

0-00-600-11041

BUNKER TO FEEDER ARRANGEMENT

58

TRY

Boiler

BTG-HFE-DWG-M-0039

0-00-020-76307
0-00-020-76308

LAYOUT OF COLD AIR DUCT

59

TRY

Boiler

BTG-HFE-DWG-M-0040

0-00-020-76309 to
0-00-020-76312

LAYOUT OF HOT AIR DUCT

60

TRY

Boiler

BTG-HNA-DWG-M-0041

0-00-020-76313
0-00-020-76314

LAYOUT OF FG DUCT-ECO TO APH OUTLET

61

TRY

Boiler

BTG-HBK-DSH-M-0042

0-00-020-76406
0-00-020-76407

LOCATION OF FURNACE OPENINGS AND


BUCKSTAYS

62

TRY

Boiler

BTG-XXX-DWG-M-0043

0-00-027-46709

PPA - EXPANSION MOVEMENT DIAGRAM

63

TRY

Boiler

BTG-XXX-DSH-M-0044

EXPN MOVMNT DIAG-SEC.PASS AND AIR


DUCT HOPPR

64
65
66

TRY
TRY
TRY

Boiler
Boiler
Boiler

BTG-HNE-DSH-M-0424
BTG-HCB-DWG-I-0004
BTG-HFA-DWG-M-0045

CPT-1306
4-97-096-93655
1-00-600-10627

DATA FOR SIZING CHIMNEY


SB ANALOG CONTROL SCHEME
BUNKER EMPTYING ARRANGEMENT

I
I

67

TRY

Boiler

BTG-XXX-DSH-M-0046

0-99-100-40259
0-99-100-40260

PA,FD,&ID FAN HANDLING

68

TRY

Boiler

BTG-GMQ-DWG-M-0047

0-99-300-40261

CIRCULATING WATER PUMP HANDLING


ARRANGEMENT

69

TRY

Boiler

BTG-XXX-DWG-M-0048

0-99-400-40262
0-99-400-40263

APH/SCAPH HANDLING ARRANGEMENT

70

TRY

Boiler

BTG-XXX-DWG-M-0049

0-99-502-40264

PRESSURE PARTS HANDLING ARRANGEMENT I

71

TRY

Boiler

BTG-XXX-DSH-M-0050

0-00-020-76305
0-00-020-76306

TERMINAL POINT DETAILS OF FEED


WATER,MS,CRH&HRH PIPINGS

73 OF 276

I
I
I
I

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER
DRAWING Drawing/document
LIST
Drawing/Doc. No.
title

2X660 MW IB VALLEY TPS

OPGC Document No.


Dept

2-00-047-47586

SAFETY VALVE SETTING FOR


SEPEPARATORE, SH,RH AND SB -OTSC

LNTP
Purpose reference
(I/ A)

72

TRY

Boiler

BTG-XXX-DSH-M-0051

73

TRY

Boiler

BTG-HFB-DWG-I-0005

Gravimetric Feeder Control Schematic Diagram & I


Write-Up

74

TRY

Boiler

BTG-XXX-DWG-I-0163

Furnace temperature Probe Datasheets & Wiring


Diagrams

75

TRY

Boiler

BTG-XXX-DSH-I-0006

TP DETAILS - MEASUREMENT AND CONTROLS I

76

TRY

Boiler

BTG-XXX-DWG-I-0007

STLD SYSTEM - INTERCONNECTION DIAGRAM I

77

TRY

Boiler

BTG-XXX-DSH-I-0008

LOCATION OF THERMOCOUPLES FOR DRUM,


SH & RH METAL TEMP. MEASUREMENT

78

TRY

Boiler

BTG-PAC-DWG-M-0052

40-GA-BCWP-001

GA drawing of Boiler Circulating Water Pump

79

TRY

Boiler

BTG-XXX-DWG-I-0164

40-WU-ERV-001

Electromatic Relief Valve (ERV) Control Write -Up I


& Interconnection Diagrams

80

TRY

Boiler

BTG-QL-DWG-M-0053

Layout & GA of Auxiliary boiler

81

TRY

Boiler

BTG-LA-DWG-M-0430

P & ID of steam and feed water system of Auxiliary


boiler

82

TRY

Boiler

BTG-QHL-DWG-M-0431

P & ID of air and flue gas system of Auxiliary boiler

83

TRY

Boiler

BTG-HJF-DWG-M-0432

P & ID of fuel oil system of Auxiliary boiler

84

TRY

Boiler

BTG-QL-SCH-M-0054

Valve schedule of Auxiliary boiler

85

TRY

ELEVATOR

GA & Machine Room Layout of 2 Tons passenger


cum goods elevator

86

RPT

MDL

Err:512

MDL:IB VAL:R652-653/00

MASTER DRAWING LIST-RPT

87
88

RPT
RPT

QAP
APH

Err:512
BTG-HLD-DWG-M-0055

IB_VALLEY.BAP_QP
1-55-220-02571/00

Quality Plan
GA of Air Preheater

89

RPT

APH

BTG-HLD-DWG-M-0056

3-52-220-02495/00

GA Notes of Air Preheater

90

RPT

AQCS

BTG-HDE-DWG-M-0057

0-00-111-27437 /00

General arrangement drawing of ESP

91
92

RPT
RPT

AQCS
AQCS

BTG-HDE-CAL-M-0058
BTG-UMC-DWG-S-0005

AQCS:R652:C:SIZ:002
0-00-112-27468

ESP sizing calculation


ESP foundation plan including load details

74 OF 276

A
A

A
A
I
I
A
A
I

1 (i)
2 (i)
2 (vii)
2 (vii)
2 (vii)
2 (ii)
3 (v)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

93

RPT

AQCS

BTG-HDE-DWG-M-0059

3-00-118-37857/00

ESP hopper thermal movement diagram

94

RPT

AQCS

BTG-HDE-DSH-M-0060

AQCS:R652:C:ACD:001

ESP hopper ash collection data

95

RPT

AQCS

BTG-HNE-DWG-M-0061

0-87-100-80382

Chimney GA Drawing for Auxiliary Boiler

96

RPT

AQCS

BTG-UMC-DWG-S-0006

2-87-010-05454

Chimney Foundation Drawing for Auxiliary Boiler

97
98
99

RPT
RPT
RPT

E C&I
E C&I
E C&I

BTG-HNA-DSH-I-0009
BTG-XXX-DWG-E-0002
BTG-XXX-DWG-E-0003

TWP:IBVALLEY P-II /00


2-00-114-29596/00
3-00-114-37489/00 3-00-114-37502/00

Write-up on ESP controllers & IOS


Electrical scope of supply drawing
SLD & scheme for ACP

100

RPT

E C&I

BTG-XXX-DWG-E-0004

2-00-114-29611/ 00 SLD & scheme for LTMSB


3-00-114-37502/ 00

101

RPT

E C&I

BTG-CWQ-DWG-E-0005

2-00-114-29595/00

Recommended layout of ESP control room

102

RPT

E C&I

BTG-CWQ-SCH-E-0006

2-00-114-29597/00

Cable Schedule

103

RPT

E C&I

BTG-BAU-DWG-E-0007

2-00-114-29598/00
Earthing scheme
2-00-114-29599/00

104

RPT

E C&I

BTG-SB-DWG-E-0008

2-00-114-29601/00

Field connection diagram of heating elements

105
106
107
108
109
110
111

RPT
RPT
RPT
RPT
RPT
RPT
RPT

E C&I
E C&I
E C&I
E C&I
E C&I
FANS
FANS

BTG-XXX-LIST-E-0009
BTG-HNA-DSH-I-0010
BTG-HLD-DWG-I-0165
BTG-HLD-SCH-I-0011
BTG-HLD-PCD-I-0012
BTG-HLB-DWG-M-0062
BTG-HNC-DWG-M-0063

Rev 00
2-00-114-29600/00
2-00-114-29656/00
2-00-114-29657/00
2-00-114-29658/00
3-00-102-37416/00
3-00-103-37417/00

Electrical Load list


Interlocking System for ESP
Scheme of APH with Instruments
Measure & Control schedule for APH
Write Up for APH with Instrument
Performance curve for FD Fan
Performance curve for ID Fan

I
I
A
A
A
A

112
113
114
115

RPT
RPT
RPT
RPT

FANS
FANS
FANS
FANS

BTG-HFE-DWG-M-0064
BTG-XXX-DWG-M-0065
BTG-HLB-DWG-M-0066
BTG-HNC-DWG-M-0067

3-00-104-37418/00
3-00-106-37419/00
1-00-098-28759/00
1-00-099-28760/00

Performance curve for PA Fan


Performance curve for Seal Air Fan
GA of FD Fan
GA of ID Fan

A
A
I

116
117

RPT
RPT

FANS
FANS

BTG-HFE-DWG-M-0068
BTG-XKW-DWG-M-0069

1-00-100-28761/00
1-00-106-28762/00

GA of PA Fan
GA of Seal Air Fan

118
119

RPT
RPT

FANS
FANS

BTG-HLB-DWG-M-0070
BTG-HLB-PCD-M-0071

1-00-098-29658
2-00-107-29585/00

GA of FD Fan For Auxiliary Boiler


Lube Oil scheme with write up for FD fan

75 OF 276

I
I
A
A
I
I
A
A
I
I
I
I

2 (iii)
2 (iii)
2 (vii)
3 (v)
2 (vi)
2 (ii)
2 (ii)
2 (ii)
2 (iv)
2 (vi)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (vi)
2 (iv)
2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vii)
2 (vii)
2 (vii)
2 (vii)
2 (vii)
2 (vi)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

120

RPT

FANS

BTG-HFE-PCD-M-0072

2-00-107-29586/00

Lube Oil scheme with write up for PA fan

121

RPT

FANS

BTG-HNC-PCD-M-0073

2-00-107-29587/00

Lube Oil scheme with write up for ID fan

122
123
124
125

RPT
RPT
RPT
RPT

FANS
FANS
APH
APH

BTG-HLB-DWG-M-0074
BTG-HFE-DWG-M-0075
BTG-XXX-DWG-M-0076
BTG-UMC-DSH-S-0007

2-00-098-29588/00
2-00-100-29589/00

Silencer Arrangement for FD fan


Silencer Arrangement for PA fan
Assembly of SCAPH
Air Receiver location and Foundation loading
details

126

RPT

AQCS

BTG-HDE-DSH-M-0077

ESP Flow model test procedure

127

RPT

AQCS

BTG-HDE-DSH-M-0078

ESP G.D test procedure

128

RPT

AQCS

BTG-HDE-DSH-M-0079

ESP Performance Guarantee test procedure

129

RPT

Tech Services

Err:512

O & M Manuals

130

RPT

Tech Services

BTG-XXX-DWG-M-0080

Erection Drawings

131
132

PEM
PEM

MDL
AUX SYSTEM

PG

Err:512
BTG-ASN-DWG-E-0010

PE-SC-391-100-P001
PE-DG-391-565-E001

ELE
133

PEM

AUX SYSTEM

134

PEM

MV SYSTEM

135

PEM

MV SYSTEM

136

PEM

MV SYSTEM

137

PEM

MV SYSTEM

138

PEM

MV SYSTEM

ELE
ELE
ELE
ELE
ELE
ELE

MASTER DRAWING LIST-PEM


ELECTRICAL SINGLE LINE DIAGRAM FOR
AUXILIARY POWER DISTRIBUTION

BTG-BCA-CAL-E-0011

PE-DC-391-565-E002

DESIGN CALCULATIONS FOR GENERATOR


AND MV SYSTEMS

BTG-BCA-DWG-E-0012

PE-DG-391-505-E001

SLD FOR 11kV UNIT SWITCHBOARD

BTG-BCA-DWG-E-0013

PE-DG-391-505-E003

LOGIC DIAGRAM FOR 11KV SWITCHGEAR

BTG-BCA-DWG-E-0014

PE-DG-391-505-E004

LOGIC DIAGRAM FOR 3.3KV SWITCHGEAR

BTG-BCA-DWG-E-0015

PE-DG-391-505-E005

LOGIC DIAGRAM FOR BTS PANEL

BTG-BCA-CAL-E-0016

PE-DG-391-505-E006

CT/VT SIZING CALCULATIONS FOR MV


SWITCHBOARDS

76 OF 276

A
A

2 (vi)
2 (vi)

I
I

2 (vii)
2 (vii)

1 (i)
2 (ii)

I
I

A
A
A
A
A
A
I

2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)
2 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

139

PEM

MV SYSTEM

140

PEM

MV SYSTEM

141

PEM

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BCA-DWG-E-0017

PE-DG-391-505-E041

SLD FOR 3.3kV UNIT AUXILIARY


SWITCHBOARD

BTG-BCA-DWG-E-0018

PE-DG-391-505-E051

SLD FOR 3.3kV STATION AUXILIARY


SWITCHBOARD

BTG-BHA-DWG-E-0505

PE-DG-391-506-E004

CONTROL LOGIC FOR 415V PCC/ MCC


INCOMER, BUS COUPLER & OUTGOING
FEEDERS

Dept
ELE
ELE
ELE

142

PEM

PRTN & CTRL

143

PEM

LAYOUT

144

PEM

LAYOUT

145

PEM

PIPING
LAYOUT

MPL

146

PEM

PIPING
LAYOUT

MPL

147

PEM

PIPING
LAYOUT

MPL

148

PEM

PIPING
LAYOUT

MPL

149

PEM

PIPING
LAYOUT

MPL

150

PEM

PIPING
LAYOUT

MPL

151
152

PEM
PEM

LAYOUT
LAYOUT

153

PEM

POWER
CYCLE

MSE

154

PEM

POWER
CYCLE

MSE

155

PEM

POWER
CYCLE

MSE

156

PEM

POWER
CYCLE

MSE

157

PEM

POWER
CYCLE

MSE

158

PEM

POWER
CYCLE

MSE

ELE
MPL
ELE

ELE
C&I

LNTP
Purpose reference
(I/ A)

2 (ii)
2 (ii)

BTG-MKY-DWG-E-0019

PE-DG-391-510-E001

SLD FOR GENERATOR CIRCUIT METERING &


PROTECTION [STG]

BTG-XXX-DBR-M-0433

PEDG391100M001

DESIGN BASIS DOCUMENT FOR EQUIPMENT


LAYOUT

BTG-XXX-DWG-E-0020

PE-DC-391-100-E101

DESIGN PHILOSOPHY FOR ELECTRICAL


EQUIPMENT LAYOUT

BTG-XXX-DWG-M-0081

PEDG391100M002

MAIN EQUIPMENT LAYOUT PLAN

BTG-XXX-DWG-M-0082

PEDG391100M003

TG EQUIPMENT LAYOUT DRAWING AT 0.0M

BTG-XXX-DWG-M-0083

PEDG391100M004

TG EQUIPMENT LAYOUT DRAWING AT 8.5 M

BTG-XXX-DWG-M-0084

PEDG391100M005

TG EQUIPMENT PLAN AT 17.0M

BTG-XXX-DWG-M-0085

PEDG391100M006

TG EQUIPMENT PLAN AT DEAERATOR FLOOR

BTG-XXX-DWG-M-0086

PEDG391100M007

CROSS SECTION OF MAIN PLANT

BTG-XXX-DWG-E-0021
BTG-XXX-DWG-E-0022

PE-DG-391-100-E001
PE-DG-391-145-I401

LAYOUT OF TRANSFORMER YARD


CCR/EER/COMPUTER ROOM LAYOUT

BTG-XXX-DWG-M-0087

PE-DG-391-100-N100

LEGEND

BTG-XXX-DWG-M-0434

PE-DG-391-100-N101

P & ID - MS, HRH, CRH

BTG-XXX-DWG-M-0435

PE-DG-391-100-N102

P & ID - HP/ LP BYPASS SYSTEM

BTG-LBQ-DWG-M-0436

PE-DG-391-100-N103

P & ID - EXTRACTION STEAM SYSTEM FOR


HEATERS

BTG-LCJ-DWG-M-0437

PE-DG-391-100-N104

P & ID - HEATER DRAINS & VENTS SYSTEM

BTG-LA-DWG-M-0438

PE-DG-391-100-N105

P & ID - FEED WATER SYSTEM

77 OF 276

2 (ii)

A
A
A
A
A
A
A
A
A
A
A
A
A
A

2 (ii)
2 (iii)
2 (iii)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (v)
2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vi)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group
PEM

POWER
CYCLE

MSE

160

PEM

POWER
CYCLE

MSE

161

PEM

POWER
CYCLE

MSE

162

PEM

POWER
CYCLE

MSE

163

PEM

POWER
CYCLE

MSE

164

PEM

POWER
CYCLE

MSE

165
166
167

PEM
PEM
PEM

HBD
PH STR
ELEVATOR

168

PEM

D/G EOT
CRANE

MAX

169

PEM

D/G EOT
CRANE

MAX

170

PEM

LIFTING
EQMT

MAX

171
172
173

PEM
PEM
PEM

CST
MRS
AC

174

PEM

VENTILATION

175

PEM

COMPRESSE
D AIR

176

PEM

GENERAL

177

PEM

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

179

PEM

PEM

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-LC-DWG-M-0439

PE-DG-391-100-N106

P & ID - CONDENSATE SYSTEM

BTG-LBG-DWG-M-0440

PE-DG-391-100-N107

P & ID - AUXILIARY STEAM SYSTEM

BTG-XXX-DWG-M-0441

PE-DG-391-100-N108

P & ID - CENTRAL LUBE OIL STORAGE AND


TRANSFER SYSTEM

BTG-LCR-DWG-M-0442

PE-DG-391-100-N110

P & ID - DM MAKE UP WATER SYSTEM

BTG-LCM-DWG-M-0443

PE-DG-391-100-N111

P & ID - STEAM DRAIN SYSTEM

BTG-LBS-DWG-M-0444

PE-DG-391-100-N112

P & ID - EXTRACTION STEAM FOR BFP


TURBINE

BTG-XXX-DWG-M-0088
BTG-UMA-DWG-S-0008
BTG-SNM-DSH-S-0009

PE-DG-391-100-N150
PE-DG-391-611-C059
PE-DC-391-502-A001

HEAT BALANCE DIAGRAM


PH BLDG. - FOUNDATION LOADING
DESIGN MEMORANDUM FOR ELEVATOR

BTG-SMS-DSH-M-0420

PE-DC-391-501-A001

DESIGN MEMORANDUM FOR D/G EOT CRANE


ABOVE 50T

PE-DC-391-501-A002

DESIGN MEMORANDUM FOR D/G EOT CRANE


UPTO 50T

BTG-SML-DSH-M-0421

PE-DC-391-524-A001

DESIGN MEMORANDUM FOR S/G CRANE,


HOIST & CPB

BTG-XXX-DSH-M-0422
BTG-XXX-DSH-M-0423
BTG-SA-DSH-M-0089

PE-DC-391-167-A001
PE-DC-391-160-A001
PE-DC-391-553-A001

DATASHEET OF MISC TANKS


DESIGN MEMORANDUM OF MRS
DESIGN PHILOSOPHY FOR AC SYSTEM

BTG-XXX-DSH-M-0090

PE-DC-391-554-A001

DESIGN PHILOSOPHY FOR VENT. SYSTEM

BTG-SCA-DSH-M-0091

PE-DC-391-555-A001

DESIGN MEMORANDUM OF COMPRESSED AIR


SYSTEM

BTG-XXX-DSH-S-0010

PE-DC-391-600-C001

DESIGN CRITERION FOR STRUCTURAL


WORKS

BTG-XXX-CAL-E-0023

PE-DC-391-507-E001

DESIGN CALCULATIONS FOR MV CABLES


SELECTION & SIZING

DESIGN CALCULATIONS FOR LV CABLES


SELECTION & SIZING

Dept

159

178

MASTER DRAWING LIST

MSE
CIV
MAX

MAX
MAX
MAX
MAX
MAX
CIV

BTG-XXX-CAL-E-0024

BTG-XXX-DSH-E-0025

PE-DC-391-507-E002

PE-DC-391-507-E004

LNTP
Purpose reference
(I/ A)
A
A
A
A
A
A
A
A
A

A
A
A
A

2 (vi)
2 (vi)
2 (vi)
2 (vi)
2 (vi)
3 (ii)
3 (vi)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

4 (i)

CABLE ERECTION PHILOSOPHY

4 (i)
A

78 OF 276

2 (vi)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

180

181

MU /PEM System/
group
PEM

PEM

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE
ELE

FIRE
SEALING

183

PEM

DC SYSTEM

184

PEM

GRNDG &
LTNG PRTN

ELE

GRNDG &
LTNG PRTN

ELE

GRNDG &
LTNG PRTN

ELE

GRNDG &
LTNG PRTN

ELE

GRNDG &
LTNG PRTN

ELE

186

187

188

189

PEM

PEM

PEM

PEM

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-XXX-DSH-E-0026

PE-DG-391-507-E005

TYPICAL DETAILS OF CABLE TRAYS AND


ACCESSORIES

INSTALLATION DETAILS FOR CABLE TRAY


SUPPORT SYSTEM

I
I

BTG-XXX-DSH-E-0027

PEM

PEM

ELE

PE-DG-391-507-E006

LTG SYSTEM

191

PEM

DG SYSTEM

BTG-BT-DSH-E-0028

PE-DC-391-508-E001

DESIGN MEMORANDUM FOR 220V DC SYSTEM

BTG-BAU-DSH-E-0029

PE-DC-391-509-E002

DESIGN MEMORANDUM FOR GROUNDING


SYSTEM

DESIGN MEMORANDUM FOR LIGHTNING


PROTECTION SYSTEM

PE-DC-391-509-E003

PE-DG-391-509-E004

192

PEM

AUX SYSTEM

PE-DG-391-509-E005

PE-DG-391-509-E006

PE-DC-391-510-E003

MSE

194

PEM

POWER
CYCLE

MSE

4 (i)

TYPICAL ABOVE GROUND EARTHING DETAILS

4 (i)

TYPICAL BELOW GROUND EARTHING DETAILS

4 (i)

TYPICAL LIGHTNING PROTECTION DETAILS

4 (i)

CT & VT CALCULATIONS FOR GENERATOR


CIRCUIT METERING & PROTECTION [STG]

4 (i)

BTG-XXX-DSH-E-0035

PE-DC-391-558-E001

DESIGN MEMORANDUM FOR LIGHTING


SYSTEM

BTG-BD-CAL-E-0036

PE-DC-391-561-E001

DESIGN CALCULATIONS FOR EMERGENCY


SUPPLY DG SIZING

BTG-XXX-DSH-E-0037

PE-DC-391-565-E003

BASIC TECHNICAL FEATURES FOR HT/LT


MOTORS
(FOR BHEL-PEM SCOPE PACKAGES)

ELE
POWER
CYCLE

4 (i)

I
BTG-MKY-CAL-E-0034

PEM

4 (i)

I
BTG-BAU-DSH-E-0033

193

4 (i)

I
BTG-BAU-DSH-E-0032

ELE

4 (i)

DESIGN MEMORANDUM FOR FIRE SEALING


SYSTEM

BTG-BAU-DSH-E-0031

ELE

4 (i)

PE-DG-391-507-E007

ELE
PEM

LNTP
Purpose reference
(I/ A)

BTG-SG-DSH-M-0092

BTG-BAU-DSH-E-0030

PRTN & CTRL

190

2X660 MW IB VALLEY TPS

Dept

182

185

MASTER DRAWING LIST

4 (i)
4 (i)

BTG-XXX-DSH-I-0166

PE-DC-391-100-N101

INTERLOCK & PROTECTION WRITE-UP FOR


REGENERATIVE SYSTEM

Err:512

PE-DC-391-100-N102

WRITE-UP FOR CENTRAL LUBE OIL


PURIFICATION SYSTEM

79 OF 276

4 (i)

4 (i)
4 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-QSV-DSH-M-0093

PE-DC-391-100-N103

WRITE-UP FOR HP BYPASS SYSTEM

BTG-LCR-DSH-M-0094

PE-DC-391-100-N104

WRITE-UP FOR AUXILIARY PRDS SYSTEM

BTG-MAN-DSH-M-0095

PE-DC-391-100-N105

WRITE-UP FOR DM MAKE UP WATER SYSTEM

BTG-LCB-CAL-M-0096

PE-DC-391-100-N111

CEP SIZING CALCULATION

BTG-XXX-CAL-M-0097

PE-DC-391-100-N112

BFP SIZING CALCULATION

BTG-XXX-SCH-M-0098

PE-SC-391-100-N121

PIPE SCHEDULE (POWER CYCLE )

BTG-XXX-SCH-M-0099

PE-SC-391-100-N122

VALVE SCHEDULE ( POWER CYCLE )

BTG-XXX-CAL-M-0100

PE-DC-391-100-N125

MISCELLANEOUS PUMP SIZING CALCULATION

BTG-XXX-CAL-M-0101

PE-DC-391-100-N120

SIZING CALCULATION FOR AUXILIARY PRDS

BTG-BCA-DWG-E-0038

PE-DG-391-100-E002

LAYOUT OF MV SWITCHGEAR ROOM

BTG-BHA-DWG-E-0039
BTG-XXX-DWG-E-0506

PE-DG-391-100-E003
PE-DG-391-100-E006

LAYOUT OF LV SWITCHGEAR ROOM


LAYOUT OF BOILER SWITCHGEAR ROOM

BTG-XXX-DWG-E-0040

PE-DC-391-555-A002

IA DISTRIBUTION SCHEME

BTG-XXX-DWG-E-0041

PE-DC-391-555-A003

SA DISTRIBUTION SCHEME

BTG-LFN-DSH-M-0102

PE-DC-391-154-A001

DESIGN MEMORANDUM OF CHEMICAL


DOSING SYSTEM

BTG-LFN-DSH-M-0103

PE-DC-391-154-A501

DESIGN MEMORANDUM OF OXYGEN DOSING


SYSTEM

BTG-XXX-DSH-M-0104

PE-DC-391-165-N002

CW AND ACW SYSTEM DESGIN PHILOSOPHY


& SYSTEM WRITE-UP

BTG-XXX-DWG-M-0105
BTG-XXX-DWG-M-0106

PE-DG-391-165-N001
PE-DC-391-179-N002

CW AND ACW SYSTEM P&ID


DMCW SYSTEM DESGIN PHILOSOPHY &
SYSTEM WRITE-UP

BTG-PGC-DWG-M-0107

PE-DG-391-179-N001

DMCW SYSTEM P&ID

BTG-PGC-SCH-M-0108
BTG-XXX-DWG-M-0109

PE-DG-391-179-N004
PE-DG-391-172-N003

VALVE SCHEDULE- DMCW SYSTEM


SW AND PW DISTN. P&ID

Dept

195

PEM

POWER
CYCLE

MSE

196

PEM

POWER
CYCLE

MSE

197

PEM

POWER
CYCLE

MSE

198

PEM

POWER
CYCLE

MSE

199

PEM

POWER
CYCLE

MSE

200

PEM

POWER
CYCLE

MSE

201

PEM

POWER
CYCLE

MSE

202

PEM

POWER
CYCLE

MSE

203

PEM

POWER
CYCLE

MSE

204

PEM

LAYOUT

205
206

PEM
PEM

LAYOUT
LAYOUT

207

PEM

COMPRESSE
D AIR

MAX

208

PEM

COMPRESSE
D AIR

MAX

209

PEM

CHEM
DOSING

MAX

210

PEM

O2 DOSING

211

PEM

CW/ ACW

212
213

PEM
PEM

CW/ ACW
DMCW

214

PEM

DMCW

215
216

PEM
PEM

DMCW
SW/PW

ELE
ELE
ELE

MAX
MSE
MSE
MSE
MSE
MSE
MSE

80 OF 276

LNTP
Purpose reference
(I/ A)
A
A
A
A
A
A
A
A
A
A
I
I
A
A

A
A
A
I
A

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)
4 (ii)
4 (ii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)

MASTER
DRAWING Drawing/document
LIST
OPGC Document No.
Drawing/Doc. No.
title

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

Dept

217

PEM

SW/PW

218

PEM

ACW/ DMCW

219
220

PEM
PEM

CW/ ACW
SUMP PUMPS

MSE

221
222

PEM
PEM

CPU
PRTN & CTRL

MAX

MSE
MSE

MSE

PEM

INSULATION

PE-DG-391-172-N008

VALVE SCHEDULE OF SW AND PW DISTN


SYSTEM

BTG-XXX-CAL-M-0111

PE-DG-391-179-N003

ACW/ DMCW EQUIPMENT SIZING


CALCULATIONS

BTG-XXX-SCH-M-0112
BTG-XXX-DSH-M-0113

PE-DG-391-165-N005
PE-DG-391-100-N001

VALVE SCHEDULE - CW/ ACW


DESGIN PHILOSOPHY & WRITE-UP-SUMP
PUMP

BTG-LDU-DSH-M-0114
BTG-MKY-DWG-E-0042

PE-DC-391-155-A001
PE-DG-391-510-E002

DESIGN MEMORANDUM OF CPU


LOGIC DIAGRAM FOR GENERATOR CIRCUIT
PROTECTION & ANNUNCIATION [STG]

BTG-XXX-DSH-M-0115

PEDG391169M031

MPL
224

PEM

INSULATION

PEQP391169M031
MPL

225

PEM

GCB

226

PEM

LAYOUT

ELE

PEM

GRNDG &
LTNG PRTN

228

PEM

LAYOUT

229

PEM

LAYOUT

230

PEM

GRNDG &
LTNG PRTN

231

PEM

PEM

LAYOUT

233

PEM

LAYOUT

234

PEM

LV SWGR

ELE
ELE
ELE

QUALITY PLAN FOR RESIN BONDED MINERAL


(ROCK)WOOL INSULATION

4 (iii)
4 (iii)
4 (iv)
5 (i)

5 (i)

I
I

LIGHTNING PROTECTION ARRANGEMENT FOR


MAIN PH BUILDING

5 (i)
5 (ii)

5 (ii)

BTG-XXX-DWG-M-0117

PEDG391100M030

COMPOSITE CRITICAL PIPING LAYOUT

BTG-UMY-DWG-M-0118

PEDG391100M051

PIPE RACK LAYOUT IN BTG ISLAND

BTG-BAU-DWG-E-0045

PE-DC-391-509-E033

EARTHING LAYOUT OF SWITCHGEAR ROOM


AND CONTROL ROOM

BTG-XXX-DWG-E-0046

PE-DC-391-558-E002

LIGHTING LAYOUTS ALONG WITH LIGHTING


DESIGN CALCULATIONS IN ACCORDANCE TO
SCOPE OF PACKAGE

BTG-XXX-DWG-E-0047

PE-DG-391-100-E040

CABLING LAYOUT FOR UNITISED CONTROL


EQUIPMENT ROOM

BTG-XXX-DWG-E-0048

PE-DG-391-100-E041

CABLING LAYOUT FOR CENTRAL CONTROL


ROOM

BTG-BLA-DWG-E-0049

PE-IC-391-506-E173

INTERCONNECTION DIAGRAM FOR MISC


SERVIVE MCC# 0QA

81 OF 276

4 (iii)

5 (i)

ELECTRICAL EQUIPMENT & CABLING LAYOUT


IN ESP CONTROL ROOM BUILDING

ELE
232

DESIGN MEMO FOR THERMAL INSULATION OF


PIPING AND EQUIPMENTS

TECHNICAL DETAILS OF GCB

PE-DG-391-509-E032

4 (iii)

PE-DG-391-100-E008

ELE

LTG SYSTEM

PE-DC-391-510-E100

BTG-BAU-DWG-E-0044

MPL

BTG-XXX-DWG-E-0043

ELE
MPL

BTG-XXX-DSH-M-0116

ELE
227

LNTP
Purpose reference
(I/ A)

BTG-XXX-SCH-M-0110

ELE
223

2X660 MW IB VALLEY TPS

A
A

6 (i)
6 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group
PEM

LV SWGR

236

PEM

ACW/ DMCW
SYSTEM

MSE

ACW/ DMCW
SYSTEM

MSE

ACW/ DMCW
SYSTEM

MSE

ACW/ DMCW
SYSTEM

MSE

ACW/ DMCW
SYSTEM

MSE

ACW/ DMCW
SYSTEM

MSE

238

239

240

241

242

243

244

245

246

PEM

PEM

PEM

PEM

PEM

PEM

PEM

PEM

PEM

PEM

ACW/ DMCW/
CoCW
SYSTEMS
ACW/ DMCW/
CoCW
SYSTEMS
ACW/ DMCW/
CoCW
SYSTEMS
ACW/ DMCW/
CoCW
SYSTEMS
ACW/ DMCW/
CoCW
SYSTEMS

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-BLA-DWG-E-0050

PE-IC-391-506-E174

INTERCONNECTION DIAGRAM FOR MISC


SERVIVE MCC# 0QB

BTG-XXX-DWG-M-0119

PE-V5-391-179-N001

TDS AND PERFORMACE CURVES - PHE

BTG-XXX-DWG-M-0120

PE-V5-391-179-N002

GENERAL ARRANGEMENT AND CROSS


SECTIONAL-PHE

BTG-XXX-DWG-M-0121

PE-V5-391-179-N003

PERFORMANCE CURVES OF PHE's

BTG-XXX-CAL-M-0122

PE-V5-391-179-N004

THERMAL CALCULATION OF PHE's

Err:512

PE-V5-391-179-N005

QP-PHE

Err:512

PE-V5-391-179-N006

O&M manual-PHE

BTG-XXX-DWG-M-0123

PE-V6-391-179-N001

TDS AND PERFORMACE CURVES- MISC.


PUMPS

BTG-XXX-DWG-M-0124

PE-V6-391-179-N002

GENERAL ARRANGEMENT AND CROSS


SECTIONAL--MISC PUMPS

BTG-XXX-DWG-E-0051

PE-V6-391-179-N003

TDS AND CURVES OF MOTORS FOR MISC.


PUMPS

BTG-XXX-QAD-M-0125

PE-V6-391-179-N004

QP-MISC PUMPS

BTG-XXX-QAD-M-0126

PE-V6-391-179-N005

QP- MOTORS-MISC PUMPS

Dept

235

237

MASTER DRAWING LIST

ELE

MSE

MSE

MSE

MSE

MSE

82 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

247

248

MU /PEM System/
group
PEM

PEM

ACW/ DMCW/
CoCW
SYSTEMS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-DSH-E-0052

PE-V6-391-179-N006

Motor Type Test document-MISC PUMPS

BTG-XXX-MNL-M-0127

PE-V6-391-179-N007

O&M manual-MISC PUMPS

BTG-PAH-DWG-M-0445

PE-V2-391-165-N001

P&ID OF COLTCS SYSTEM

BTG-PAH-DSH-M-0446

PE-V2-391-165-N002

TECHNICAL DATA SHEET-COLTCS

BTG-PAH-DSH-M-0447

PE-V2-391-165-N003

INSTALLATION PLAN-COLTCS

BTG-PAH-DWG-M-0448

PE-V2-391-165-N004

GENERAL ARRANGEMENT OF BALL


SEPERATOR -COLTCS

BTG-XXX-DSH-M-0128

PE-V2-391-165-N005

DETAILS OF BR SKID,BALL INJECTION PIPE &


FIXING DETAILS-COLTCS

BTG-PAH-LIST-E-0053

PE-V2-391-165-N006

PANEL-TDS, I/O LIST, CABLE SCH AND


CONTROL PHILOSPHY-COLTCS

BTG-PAH-DWG-E-0054

PE-V2-391-165-N007

GA & WIRING DIAGRAM OF PANEL-COLTCS

BTG-PAH-DSH-M-0449

PE-V2-391-165-N008

QP-COLTCS

BTG-PAH-MNL-M-0450

PE-V2-391-165-N009

O&M manual-COLTCS

BTG-KKS-DWG-I-0013

PE-V4-391-165-N001

P&ID OF SCS SYSTEM

BTG-XXX-DSH-E-0055

PE-V4-391-165-N002

TECHNICAL DATA SHEET-SCS

BTG-XXX-DWG-E-0056

PE-V4-391-165-N003

INSTALLATION PLAN-SCS

BTG-XXX-DWG-E-0057

PE-V4-391-165-N004

GENERAL ARRANGEMENT OF SCS

BTG-KKS-DWG-I-0014

PE-V4-391-165-N005

CONTROL PHILOSOPHY WITH SEQUENCE


DIAGRAM-SCS

BTG-XXX-DWG-E-0058

PE-V4-391-165-N006

GA & WIRING DIAGRAM OF PANEL-SCS

MSE

ACW/ DMCW/
CoCW
SYSTEMS

MSE

PEM

CW/ ACW
SYSTEM

MSE

250

PEM

CW/ ACW
SYSTEM

MSE

251

PEM

CW/ ACW
SYSTEM

MSE

252

PEM

CW/ ACW
SYSTEM

MSE

253

PEM

CW/ ACW
SYSTEM

MSE

CW/ ACW
SYSTEM

MSE

PEM

2X660 MW IB VALLEY TPS

Dept

249

254

MASTER DRAWING LIST

255

PEM

CW/ ACW
SYSTEM

MSE

256

PEM

CW/ ACW
SYSTEM

MSE

257

PEM

CW/ ACW
SYSTEM

MSE

258

PEM

CW/ ACW
SYSTEM

MSE

259

PEM

CW/ ACW
SYSTEM

MSE

260

PEM

CW/ ACW
SYSTEM

MSE

261

PEM

CW/ ACW
SYSTEM

MSE

262

PEM

CW/ ACW
SYSTEM

MSE

263

PEM

CW/ ACW
SYSTEM

MSE

83 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-QAD-E-0059

PE-V4-391-165-N007

QP-SCS

BTG-XXX-MNL-E-0060

PE-V4-391-165-N008

O&M manual-SCS

BTG-XXX-DWG-M-0129

PE-V8-391-172-N001

TDS AND PERFORMACE CURVES OF SUMP


PUMPS

BTG-XXX-DWG-M-0130

PE-V8-391-172-N002

GENERAL ARRANGEMENT AND CROSS


SECTIONAL DRG-SUMP PUMPS

BTG-XXX-DWG-E-0061

PE-V8-391-172-N003

TDS AND CURVES FOR MOTORS-SUMP


PUMPS

BTG-XXX-PCD-I-0015

PE-V8-391-172-N004

WRITE UP, WIRING DIAGRAM & GA OF


CONTROL PANEL-SUMP PUMPS

BTG-XXX-QAD-M-0131

PE-V8-391-172-N005

QP-SUMP PUMPS

BTG-XXX-MNL-M-0132

PE-V8-391-172-N006

O&M manual-SUMP PUMPS

BTG-XXX-DWG-I-0016

PE-DG-391-145-I003

CABLE BLOCK DIAGRAM(Station C&I)

BTG-KKS-DWG-I-0017
BTG-QUL-DWG-I-0018
BTG-XXX-SCH-M-0133
BTG-XXX-SCH-M-0134
BTG-HNC-DWG-I-0019

PE-DG-391-145-I004
PE-DG-391-145-I110
PE-DG-391-145-I202
PE-DG-391-145-I203
PE-DG-391-145-I204

UPS SCHEME
SWAS SCHEME
ALARM SCHEDULE
S.O.E SCHEDULE
SEQ. CONTROL SCHEME FOR ID FANS

A
I
I

BTG-HLB-DWG-I-0020

PE-DG-391-145-I205

SEQ. CONTROL SCHEME FOR FD FANS

BTG-HFE-DWG-I-0021

PE-DG-391-145-I206

SEQ.CONTROL SCHEME FOR PA FANS

BTG-HLD-DWG-I-0022

PE-DG-391-145-I207

SEQ. CONTROL SCHEME FOR AIR HEATER

BTG-LCB-DWG-I-0023
BTG-LAB-DWG-I-0024

PE-DG-391-145-I210
PE-DG-391-145-I211

SEQ. CONTROL SCHEME FOR CEP


SEQ. CONTROL SCHEME FOR HP HEATER

I
I

BTG-LCA-DWG-I-0025

PE-DG-391-145-I212

SEQ. CONTROL SCHEME FOR LP HEATER - 1

BTG-LCA-DWG-I-0026

PE-DG-391-145-I213

SEQ. CONTROL SCHEME FOR LP HEATER - 2

BTG-LCA-DWG-I-0027

PE-DG-391-145-I214

SEQ. CONTROL SCHEME FOR LP HEATER 3&4

Dept

264

PEM

CW/ ACW
SYSTEM

MSE

265

PEM

CW/ ACW
SYSTEM

MSE

266

PEM

SUMP PUMPS

267

PEM

SUMP PUMPS

MSE
MSE

268

PEM

SUMP PUMPS

269

PEM

SUMP PUMPS

270

PEM

SUMP PUMPS

271

PEM

SUMP PUMPS

272

PEM

C&I

273
274
275
276
277

PEM
PEM
PEM
PEM
PEM

C&I
C&I
C&I
C&I
C&I

278

PEM

C&I

279

PEM

C&I

280

PEM

C&I

281
282

PEM
PEM

C&I
C&I

283

PEM

C&I

284

PEM

C&I

285

PEM

C&I

2X660 MW IB VALLEY TPS

MSE
MSE
MSE
MSE
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I

84 OF 276

I
I

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

286

PEM

C&I

287

PEM

C&I

288

PEM

C&I

289

PEM

C&I

290

PEM

C&I

291

PEM

C&I

292

PEM

C&I

293

PEM

C&I

294
295
296
297

PEM
PEM
PEM
PEM

C&I
C&I
C&I
C&I

298

PEM

C&I

299
300
301
302
303
304

PEM
PEM
PEM
PEM
PEM
PEM

C&I
C&I
C&I
C&I
C&I
C&I

305

PEM

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-LAC-DWG-I-0028

PE-DG-391-145-I215

SEQ. CONTROL SCHEME FOR MDBFP

BTG-LCR-DWG-I-0029

PE-DG-391-145-I216

SEQ. CONTROL SCHEME FOR DM MAKEUP


PUMPS

BTG-XXX-DWG-I-0030

PE-DG-391-145-I218

SEQ. CONTROL SCHEME FOR TG ECW PUMPS I

BTG-XXX-DWG-I-0031

PE-DG-391-145-I219

SEQ. CONTROL SCHEME FOR BOILER ECW


PUMP

BTG-HAG-DWG-I-0032

PE-DG-391-145-I220

SEQ. CONTROL SCHEME FOR BOILER CIRC.


WATER PUMP

BTG-PCB-DWG-I-0033

PE-DG-391-145-I222

SEQ. CONTROL SCHEME FOR ACWP

BTG-XXX-DWG-I-0034

PE-DG-391-145-I223

BINARY DRIVE CONTROL SCHEME FOR MICS. I


DRIVE(Station C&I)

BTG-KKS-DWG-I-0035

PE-DG-391-145-I273

CONTROL SCHEME FOR LP DOSING PUMPS

BTG-XXX-DWG-I-0036
BTG-XXX-DWG-I-0037
BTG-XXX-DWG-I-0038
BTG-XXX-DWG-I-0039

PE-DG-391-145-I302
PE-DG-391-145-I303
PE-DG-391-145-I304
PE-DG-391-145-I350

ANALOG CONTROL SCHEME


HP BYPASS CONTROL SCHEME
AUX. PRDS CONTROL SCHEME
CO-ORDINATED MASTER CONTROL SCHEME

I
I
I
I

BTG-XXX-DWG-I-0169

PE-DG-391-145-I402

CCR/EER/COMPUTER ROOM FLOOR CUTOUT I

BTG-XXX-DWG-I-0170
BTG-XXX-DWG-I-0171
BTG-XXX-DWG-I-0172
BTG-XXX-DWG-I-0173
BTG-XXX-DWG-E-0062
BTG-CCA-DSH-I-0040

PE-DG-391-145-I403
PE-DG-391-145-I404
PE-DG-391-145-I405
PE-DG-391-145-I406
PE-DG-391-145-I407
PE-DM-391-145-I002

SWAS ROOM LAYOUT


SWAS ROOM FLOOR CUTOUT
UPS ROOM LAYOUT
UPS ROOM FLOOR CUTOUT
UNIT CONTROL PANEL LAYOUT
DRIVE CONTROL PHILOSOPHY(Station C&I)

Dept
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I
C&I

C&I

BTG-XXX-DSH-I-00141

PE-DM-391-145-I900

C&I
306

PEM

C&I

307
308
309
310
311

PEM
PEM
PEM
PEM
PEM

C&I
C&I
C&I
C&I
C&I

2X660 MW IB VALLEY TPS

C&I
C&I
C&I
C&I
C&I
C&I

CONTROL SYSTEM FOR MECHANICAL


AUXILIARY PACKAGES

BTG-XXX-SCH-I-0042

PE-SC-391-145-I102

SCHEDULE OF INSTRUMENTS(Station C&I)

BTG-XXX-LIST-I-0043
BTG-XXX-LIST-I-0044
BTG-XXX-LIST-I-0045
BTG-XXX-LIST-I-0046
BTG-XXX-DSH-I-0047

PE-SC-391-145-I200
PE-SC-391-145-I201
PE-SC-391-145-I300
PE-SC-391-145-I301
PE-TS-391-145-I104

BINARY DRIVE LIST(Station C&I)


BINARY I/O LIST(Station C&I)
ANALOG DRIVE LIST(Station C&I)
ANALOG I/O LIST(Station C&I)
CONTROL VALVES DESIGN PARAMETERS

85 OF 276

A
I
A
I
A
A
I
A
I
I

I
I
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

312

PEM

C&I

313

PEM

C&I

314

PEM

C&I

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-XXX-DSH-I-0048

PE-TS-391-145-I105

FLOW ELEMENTS DESIGN PARAMETERS

LNTP
Purpose reference
(I/ A)
I
A

BTG-XXX-DWG-E-0063

PE-DG-391-145-I274

CONTROL SCHEME FOR OXYGEN DOSING

BTG-XXX-DWG-I-0049

PE-DG-391-145-I101

INSTRUMENT STUB DETAILS (PRESSURE /


TEMPERATURE STUB)

BTG-XXX-DWG-I-0050

PE-SC-391-145-I106

SENSOR/TRANSMITTER GROUPING(Station
C&I)

BTG-HAJ-DWG-I-0051
BTG-XXX-DWG-I-0052

PE-DG-391-145-I221
PE-SC-391-145-I106

RE-HEATER PROTECTION LOGICS


SENSOR/TRANSMITTER GROUPING(Station
C&I)

I
I

BTG-XXX-DWG-I-0053
BTG-XXX-DWG-I-0054
Err:512

PE-SC-391-145-I502
PE-SC-391-145-I511
PE-QP-391-145-I005

DISPLAYS
LOGS
QUALITY PLAN FOR FLOW NOZZLES

I
I

Err:512

PE-QP-391-145-I006

QUALITY PLAN FOR CONTROL VALVES

Err:512
BTG-XXX-DWG-E-0064
BTG-XXX-DWG-E-0065

PE-QP-391-145-I007
PE-DG-391-100-E007
PE-DG-391-100-E009

QUALITY PLAN FOR FLOW ORIFICE


LAYOUT OF DC EQUIPMENT ROOM
CABLING LAYOUT BELOW MV SWGR ROOM

I
I

BTG-XXX-DWG-E-0066

PE-DG-391-100-E010

CABLING LAYOUT BELOW LV SWGR ROOM

BTG-XXX-DWG-E-0067

PE-DG-391-100-E013

CABLING LAYOUT BELOW BOILER


SWITCHGEAR ROOM

BTG-XXX-DWG-E-0068

PE-DG-391-100-E015

ELECTRICAL EQUIPMENT & CABLING LAYOUT I


IN AIR WASHER ROOM

BTG-XXX-DWG-E-0069

PE-DG-391-100-E016

ELECTRICAL EQUIPMENT & CABLING LAYOUT I


IN AC PLANT ROOM & AHU AREA

BTG-XXX-DWG-E-0070

PE-DG-391-100-E017

ELECT. EQPT & CABLE TRAY LAYOUT IN


COMPRESSOR PLANT

BTG-XXX-DWG-E-0071

PE-DG-391-100-E036

CABLE TRAY LAYOUT ON BOILER PLATFORMS I

BTG-XXX-DWG-E-0072

PE-DG-391-100-E037

CABLING LAYOUT IN TG HALL (GROUND


FLOOR)

BTG-XXX-DWG-E-0073

PE-DG-391-100-E038

CABLING LAYOUT IN TG HALL (BELOW


OPERATING FLOOR)

Dept
C&I
C&I
C&I

315

PEM

C&I

316
317

PEM
PEM

C&I
C&I

C&I

318
319
320

PEM
PEM
PEM

C&I
C&I
C&I

C&I
C&I

321

PEM

C&I

322
323
324

PEM
PEM
PEM

C&I
LAYOUT
LAYOUT

325

PEM

LAYOUT

326

PEM

LAYOUT

327

PEM

LAYOUT

C&I

C&I

C&I
C&I
C&I
ELE
ELE
ELE
ELE
ELE

328

PEM

LAYOUT
ELE

329

PEM

LAYOUT

330

PEM

LAYOUT

331

PEM

LAYOUT

332

PEM

LAYOUT

2X660 MW IB VALLEY TPS

ELE
ELE
ELE
ELE

86 OF 276

A
A
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

333

MU /PEM System/
group
PEM

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-DWG-E-0074

PE-DG-391-100-E039

CABLING LAYOUT IN TG HALL (DEAERATOR


FLOOR, ADJOINING AREAS & RE UNITS)

BTG-XXX-DWG-E-0075

PE-DG-391-100-E041

CABLING LAYOUT FROM MAIN POWER HOUSE I


TO BOILER AREA

BTG-BCA-DWG-E-0076

PE-IC-391-505-E101

INTERCONNECTION DIAGRAM FOR 11KV UNIT I


SWITCHBOARD

BTG-BCA-DWG-E-0077

PE-IC-391-505-E108

INTERCONNECTION DIAGRAM FOR 3.3KV UNIT I


AUXILIARY SWITCHBOARD

BTG-BCA-DWG-E-0078

PE-IC-391-505-E109

INTERCONNECTION DIAGRAM FOR 3.3KV


STATION AUXILIARY SWITCHBOARD

BTG-XXX-DWG-E-0079

PE-IC-391-506-E001

INTERCONNECTION DIAGRAM FOR BREAKER I


CONTROLLED DRIVES

BTG-XXX-DWG-E-0080

PE-IC-391-506-E002

INTERCONNECTION DIAGRAM FOR UNIDIRECTIONAL DRIVES

BTG-XXX-DWG-E-0081

PE-IC-391-506-E003

INTERCONNECTION DIAGRAM FOR BIDIRECTIONAL DRIVES

BTG-BLA-DWG-E-0082

PE-IC-391-506-E101

INTERCONNECTION DIAGRAM FOR UNIT


SERVICE SWBD.-1

BTG-BLA-DWG-E-0083

PE-IC-391-506-E102

INTERCONNECTION DIAGRAM FOR UNIT


SERVICE SWBD.-2

BTG-BHA-DWG-E-0084

PE-IC-391-506-E105

INTERCONNECTION DIAGRAM FOR BOILER


MCC-1

BTG-BHA-DWG-E-0085

PE-IC-391-506-E106

INTERCONNECTION DIAGRAM FOR BOILER


MCC-2

BTG-BLA-DWG-E-0086

PE-IC-391-506-E117

INTERCONNECTION DIAGRAM FOR BOILER


ACDB-1

BTG-BLA-DWG-E-0087

PE-IC-391-506-E118

INTERCONNECTION DIAGRAM FOR BOILER


ACDB-2

BTG-BHA-DWG-E-0088

PE-IC-391-506-E121

INTERCONNECTION DIAGRAM FOR TURBINE


MCC-1

BTG-BHA-DWG-E-0089

PE-IC-391-506-E122

INTERCONNECTION DIAGRAM FOR TURBINE


MCC-2

BTG-BLA-DWG-E-0090

PE-IC-391-506-E133

INTERCONNECTION DIAGRAM FOR UNIT


SERVICE ACDB-1

BTG-BLA-DWG-E-0091

PE-IC-391-506-E134

INTERCONNECTION DIAGRAM FOR UNIT


SERVICE ACDB-2

BTG-BMA-DWG-E-0092

PE-IC-391-506-E137

INTERCONNECTION DIAGRAM FOR UNIT


EMERGENCY MCC-1

Dept

LAYOUT
ELE

334

PEM

LAYOUT

335

PEM

MV SYSTEM

336

PEM

MV SYSTEM

ELE
ELE
ELE

337

PEM

MV SYSTEM
ELE

338

PEM

LV SWGR

339

PEM

LV SWGR

340

PEM

LV SWGR

341

PEM

LV SWGR

342

PEM

LV SWGR

343

PEM

LV SWGR

344

PEM

LV SWGR

345

PEM

LV SWGR

346

PEM

LV SWGR

347

PEM

LV SWGR

348

PEM

LV SWGR

349

PEM

LV SWGR

350

PEM

LV SWGR

351

PEM

LV SWGR

2X660 MW IB VALLEY TPS

ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

87 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group
PEM

LV SWGR

353

PEM

LV SWGR

354

PEM

LV SWGR

355

PEM

LV SWGR

356

PEM

LV SWGR

357

PEM

LV SWGR

358

PEM

LV SWGR

359

PEM

LV SWGR

360

PEM

LV SWGR

361

PEM

LV SWGR

362

PEM

LV SWGR

363

PEM

LV SWGR

364

PEM

LV SWGR

365

PEM

LV SWGR

366

PEM

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

368

369

PEM

PEM

PEM

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-BMA-DWG-E-0093

PE-IC-391-506-E138

INTERCONNECTION DIAGRAM FOR UNIT


EMERGENCY MCC-2

BTG-BUA-DWG-E-0094

PE-IC-391-506-E141

INTERCONNECTION DIAGRAM FOR 220V MAIN I


DCDB-1

BTG-BUA-DWG-E-0095

PE-IC-391-506-E142

INTERCONNECTION DIAGRAM FOR 220V MAIN I


DCDB-2

BTG-BHR-DWG-E-0096

PE-IC-391-506-E157

INTERCONNECTION DIAGRAM FOR ESP A/C & I


VENT MCC-1

BTG-BHR-DWG-E-0097

PE-IC-391-506-E158

INTERCONNECTION DIAGRAM FOR ESP A/C & I


VENT MCC-2

BTG-BLA-DWG-E-0098

PE-IC-391-506-E169

INTERCONNECTION DIAGRAM FOR STATION


SERVICE SWBD.-1

BTG-BLA-DWG-E-0099

PE-IC-391-506-E170

INTERCONNECTION DIAGRAM FOR STATION


SERVICE SWBD.-2

BTG-BLA-DWG-E-0100

PE-IC-391-506-E177

INTERCONNECTION DIAGRAM FOR AIR


WASHER MCC-1

BTG-BLA-DWG-E-0101

PE-IC-391-506-E178

INTERCONNECTION DIAGRAM FOR AIR


WASHER MCC-2

BTG-BHR-DWG-E-0102

PE-IC-391-506-E181

INTERCONNECTION DIAGRAM FOR


VENTILATION MCC-1

BTG-BHR-DWG-E-0103

PE-IC-391-506-E182

INTERCONNECTION DIAGRAM FOR


VENTILATION MCC-2

BTG-BLA-DWG-E-0104

PE-IC-391-506-E205

INTERCONNECTION DIAGRAM FOR COMP


HOUSE MCC

BTG-BHR-DWG-E-0105

PE-IC-391-506-E216

INTERCONNECTION DIAGRAM FOR AIR


CONDITIONING MCC

BTG-BLA-DWG-E-0106

PE-IC-391-506-E224

INTERCONNECTION DIAGRAM FOR CPU MCC

BTG-BCA-SCH-E-0107

PE-CS-391-507-E001

CABLE SCHEDULE FOR 11KV UNIT


SWITCHBOARD

BTG-BCA-SCH-E-0108

PE-CS-391-507-E008

CABLE SCHEDULE FOR 3.3KV UNIT AUXILIARY I


SWITCHBOARD

BTG-BCA-SCH-E-0109

PE-CS-391-507-E009

CABLE SCHEDULE FOR 3.3KV STATION


AUXILIARY SWITCHBOARD

BTG-MKY-SCH-E-0110

PE-CS-391-507-E041

CABLE SCHEDULE FOR GENERATOR RELAY


PANEL

Dept

352

367

MASTER DRAWING LIST

ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

88 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

370

371

372

373

374

MU /PEM System/
group
PEM

PEM

PEM

PEM

PEM

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

PEM

LV SWGR

376

PEM

LV SWGR

377

PEM

LV SWGR

378

PEM

LV SWGR

379

PEM

LV SWGR

380

PEM

LV SWGR

381

PEM

LV SWGR

382

PEM

LV SWGR

383

PEM

LV SWGR

384

PEM

LV SWGR

385

PEM

LV SWGR

386

PEM

LV SWGR

387

PEM

LV SWGR

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-CWF-SCH-E-0111

PE-CS-391-507-E043

CABLE SCHEDULE FOR ELECTRICAL


CONTROL PANEL

BTG-CBA-SCH-E-0112

PE-CS-391-507-E048

CABLE SCHEDULE FOR DDCMIS

BTG-XXX-SCH-E-0113

PE-CS-391-507-E049

CABLE SCHEDULE FOR AVR CIRCUIT

BTG-XXX-SCH-E-0114

PE-CS-391-507-E050

CABLE SCHEDULE FOR MISCELLANEOUS


CIRCUITS

BTG-BTN-SCH-E-0115

PE-CS-391-507-E093

CABLE SCHEDULE FOR BATTERY CHARGER

BTG-BLA-SCH-E-0116

PE-CS-391-507-E101

CABLE SCHEDULE FOR UNIT SERVICE SWBD.- I


1

BTG-BLA-SCH-E-0117

PE-CS-391-507-E102

CABLE SCHEDULE FOR UNIT SERVICE SWBD.- I


2

BTG-BHA-SCH-E-0118

PE-CS-391-507-E105

CABLE SCHEDULE FOR BOILER MCC-1

BTG-BHA-SCH-E-0119

PE-CS-391-507-E106

CABLE SCHEDULE FOR BOILER MCC-2

BTG-BLA-SCH-E-0120

PE-CS-391-507-E109

CABLE SCHEDULE FOR BOILER V&D ACDB-1

BTG-BLA-SCH-E-0121

PE-CS-391-507-E110

CABLE SCHEDULE FOR BOILER V&D ACDB-2

BTG-BLA-SCH-E-0122

PE-CS-391-507-E117

CABLE SCHEDULE FOR BOILER ACDB-1

BTG-BLA-SCH-E-0123

PE-CS-391-507-E118

CABLE SCHEDULE FOR BOILER ACDB-2

BTG-BHA-SCH-E-0124

PE-CS-391-507-E121

CABLE SCHEDULE FOR TURBINE MCC-1

BTG-BHA-SCH-E-0125

PE-CS-391-507-E122

CABLE SCHEDULE FOR TURBINE MCC-2

BTG-BLA-SCH-E-0126

PE-CS-391-507-E125

CABLE SCHEDULE FOR TURBINE VALVE ACDB- I


1

BTG-BLA-SCH-E-0127

PE-CS-391-507-E126

CABLE SCHEDULE FOR TURBINE VALVE ACDB- I


2

BTG-BLA-SCH-E-0128

PE-CS-391-507-E133

CABLE SCHEDULE FOR UNIT SERVICE ACDB-1 I

Dept

CABLES &
CABLING

375

MASTER DRAWING LIST

ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

89 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group
PEM

LV SWGR

389

PEM

LV SWGR

390

PEM

LV SWGR

391

PEM

LV SWGR

392

PEM

LV SWGR

393

PEM

LV SWGR

394

PEM

LV SWGR

395

PEM

LV SWGR

396

PEM

LV SWGR

397

PEM

LV SWGR

398

PEM

LV SWGR

399

PEM

LV SWGR

400

PEM

LV SWGR

401

PEM

LV SWGR

402

PEM

LV SWGR

403

PEM

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

CABLES &
CABLING

ELE

405

PEM

PEM

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BLA-SCH-E-0129

PE-CS-391-507-E134

CABLE SCHEDULE FOR UNIT SERVICE ACDB-2 I

BTG-BMA-SCH-E-0130

PE-CS-391-507-E137

CABLE SCHEDULE FOR UNIT EMERGENCY


MCC-1

BTG-BMA-SCH-E-0131

PE-CS-391-507-E138

CABLE SCHEDULE FOR UNIT EMERGENCY


MCC-2

BTG-BUA-SCH-E-0132

PE-CS-391-507-E141

CABLE SCHEDULE FOR 220V MAIN DCDB-1

BTG-BUA-SCH-E-0133

PE-CS-391-507-E142

CABLE SCHEDULE FOR 220V MAIN DCDB-2

BTG-BHR-SCH-E-0134

PE-CS-391-507-E157

CABLE SCHEDULE FOR ESP A/C & VENT MCC- I


1

BTG-BHR-SCH-E-0135

PE-CS-391-507-E158

CABLE SCHEDULE FOR ESP A/C & VENT MCC- I


2

BTG-BLA-SCH-E-0136

PE-CS-391-507-E169

CABLE SCHEDULE FOR STATION SERVICE


SWBD.-1

BTG-BLA-SCH-E-0137

PE-CS-391-507-E170

CABLE SCHEDULE FOR STATION SERVICE


SWBD.-2

BTG-BHR-SCH-E-0138

PE-CS-391-507-E181

CABLE SCHEDULE FOR VENTILATION MCC-1

BTG-BHR-SCH-E-0139

PE-CS-391-507-E182

CABLE SCHEDULE FOR VENTILATION MCC-2

BTG-BLA-SCH-E-0140

PE-CS-391-507-E205

CABLE SCHEDULE FOR COMP HOUSE MCC

BTG-BHR-SCH-E-0141

PE-CS-391-507-E216

CABLE SCHEDULE FOR AIR CONDITIONING


MCC

BTG-BHA-SCH-E-0142

PE-CS-391-507-E251

CABLE SCHEDULE FOR 240V AC FUSE DB-1

BTG-BHA-SCH-E-0143

PE-CS-391-507-E252

CABLE SCHEDULE FOR 240V AC FUSE DB-2

BTG-BHR-SCH-E-0144

PE-CS-391-507-E801

CABLE SCHEDULE FOR A/C SYSTEM

BTG-BHR-SCH-E-0145

PE-CS-391-507-E803

CABLE SCHEDULE FOR VENTILATION SYSTEM I

BTG-SCA-SCH-E-0146

PE-CS-391-507-E804

CABLE SCHEDULE FOR COMPRESSED AIR


SYSTEM

Dept

388

404

MASTER DRAWING LIST

ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE
ELE

90 OF 276

LNTP
Purpose reference
(I/ A)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

406

407

MU /PEM System/
group
PEM

PEM

CABLES &
CABLING

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-SCH-E-0147

PE-CS-391-507-E809

CABLE SCHEDULE FOR CPU

BTG-MKY-DWG-E-0148

PE-DC-391-510-E004

RELAY SETTINGS CHART FOR GENERATOR


CIRCUIT PROTECTION [STG]

BTG-XXX-LIST-E-0149

PE-DC-391-510-E101

LIST OF CIRCUIT BREAKERS FOR ELECTRICAL A


SYSTEM AND THEIR CONTROL LOCATION

BTG-CWF-DWG-E-0150

PE-DG-391-510-E111

SYNCHRONISING SCHEME FOR ELECTRICAL


CONTROL PANEL (ECP)

BTG-CWF-DWG-E-0151

PE-DG-391-510-E112

FRONT VIEW OF ELECTRICAL CONTROL


PANEL (ECP)

BTG-CWF-DWG-E-0152

PE-DG-391-510-E113

INTERFACE SCHEME FOR ELECTRICAL


CONTROL PANEL (ECP)

BTG-CWF-SCH-E-0153

PE-DG-391-510-E114

ALARM SCHEDULE FOR ELECTRICAL


CONTROL PANEL (ECP)

BTG-XXX-LIST-E-0154

PE-DC-391-510-E151

ANALOG INPUT/OUTPUT LIST FOR


ELECTRICAL SYSTEM

BTG-XXX-LIST-E-0155

PE-DC-391-510-E152

BINARY INPUT/OUTPUT LIST FOR ELECTRICAL A


SYSTEM

BTG-CBA-DWG-E-0156

PE-DG-391-510-E153

LOGIC DIAGRAM FOR ELECTRICAL CONTROL


PANEL AND ASSOCIATED DDCMIS

BTG-CBA-DWG-E-0157

PE-DG-391-510-E154

LOGIC DIAGRAM FOR CIRCUIT BREAKERS


CONTROLLED FROM DDCMIS ONLY

BTG-CBA-DWG-E-0158

PE-DG-391-510-E155

PLANT ELECTRICAL SCHEMATICS FOR


DDCMIS

BTG-MKY-DWG-E-0159

PE-IC-391-510-E161

INTERCONNECTION DIAGRAM FOR


GENERATOR RELAY PANEL (STG)

BTG-CWF-DWG-E-0160

PE-IC-391-510-E164

INTERCONNECTION DIAGRAM FOR


ELECTRICAL CONTROL PANEL (ECP)

BTG-CBA-DWG-E-0161

PE-IC-391-510-E169

INTERCONNECTION DIAGRAM FOR DDCMIS

BTG-XXX-DWG-E-0162

PE-IC-391-510-E170

INTERCONNECTION DIAGRAM FOR AVR


CIRCUIT

Dept

ELE

PRTN & CTRL


ELE

408

PEM

PRTN & CTRL


ELE

409

PEM

PRTN & CTRL


ELE

410

PEM

PRTN & CTRL

411

PEM

PRTN & CTRL

ELE
ELE

412

PEM

PRTN & CTRL


ELE

413

PEM

PRTN & CTRL

414

PEM

PRTN & CTRL

415

PEM

PRTN & CTRL

ELE
ELE
ELE

416

PEM

PRTN & CTRL


ELE

417

PEM

PRTN & CTRL

418

PEM

PRTN & CTRL

419

PEM

PRTN & CTRL

ELE
ELE
ELE

420

PEM

PRTN & CTRL

421

PEM

PRTN & CTRL

2X660 MW IB VALLEY TPS

ELE
ELE

91 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

422

PEM

PRTN & CTRL

423

PEM

AUX SYSTEM

424

PEM

AUX SYSTEM

425

PEM

LAYOUT

426

PEM

LAYOUT

427

PEM

LAYOUT

428

PEM

LAYOUT

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-DWG-E-0163

PE-IC-391-510-E171

INTERCONNECTION DIAGRAM FOR


MISCELLANEOUS CIRCUITS

BTG-BCA-DSH-E-0164

PE-DC-391-565-E004

RELAY SETTINGS CHART FOR MV SYSTEM


(OTHER THAN MOTORS)

BTG-BHA-DSH-E-0165

PE-DC-391-565-E005

RELAY SETTINGS CHART FOR LV AC


AUXILIARY SYSTEM

BTG-XXX-DWG-M-0135

PE-DG-391-100-M031

COMPOSITE PIPING LAYOUT BELOW 0.0M IN


AB BAY

BTG-XXX-DWG-M-0136

PE-DG-391-100-M032

COMPOSITE PIPING LAYOUT PLAN BELOW


8.5M FLOOR

BTG-XXX-DWG-M-0137

PE-DG-391-100-M033

COMPOSITE PIPING LAYOUT PLAN BELOW


17.0M FLOOR

BTG-XXX-DWG-M-0138

PE-DG-391-100-M034

COMPOSITE PIPING LAYOUT PLAN BELOW &


ABOVE DEAERATOR FLOOR

BTG-XXX-DWG-M-0139

PE-DG-391-100-M042

LAYOUT OF PIPING IN & AROUND CS TANK &


P/H

BTG-MAG-DWG-M-0140

PE-DG-391-165-M001

LAYOUT OF CW PIPING LOCAL TO


CONDENSER

BTG-QSV-DWG-M-0141

PE-DG-391-167-M221

CENTRAL LUBE OIL PURIFICATION PIPING


LAYOUT

BTG-XXX-DWG-M-0142

PE-DG-391-172-M001

SERVICE WATER & DRINKING WATER PIPING


LAYOUT INSIDE TG BUILDING

BTG-XXX-DWG-M-0143

PE-DG-391-179-M001

ECW & ACW PIPING LAYOUT ABOVE & BELOW I


8.5M INSIDE TG BUILDING

BTG-SCB-DWG-M-0144

PE-DG-391-555-M020

IA & SA PIPING LAYOUT IN TG BUILDING

BTG-XXX-DSH-S-0011

PE-DG-391-600-C002

GENERAL NOTES FOR STRUCTURAL STEEL


WORKS.

BTG-UMA-DWG-S-0012

PE-DG-391-612-C001

PH BLDG. - STRUCTURAL FRAMING ALONG A


ROW

BTG-UMA-DWG-S-0013

PE-DG-391-612-C002

PH BLDG. - STRUCTURAL FRAMING ALONG B


ROW

BTG-UMA-DWG-S-0014

PE-DG-391-612-C003

PH BLDG. - STRUCTURAL FRAMING ALONG C


ROW

BTG-UMA-DWG-S-0015

PE-DG-391-612-C004

PH BLDG. - STRUCTURAL FRAMING ALONG D & I


E'A ROW

BTG-UMA-DWG-S-0016

PE-DG-391-612-C006

PH BLDG. - DETAILS OF ROOF TRUSS.

Dept
ELE
ELE
ELE
MPL
MPL
MPL
MPL

429

PEM

LAYOUT

430

PEM

LAYOUT

431

PEM

LAYOUT

432

PEM

LAYOUT

MPL
MPL
MPL
MPL

433

PEM

LAYOUT
MPL

434

PEM

LAYOUT

435

PEM

GENERAL

436

PEM

PH STR

437

PEM

PH STR

438

PEM

PH STR

439

PEM

PH STR

440

PEM

PH STR

2X660 MW IB VALLEY TPS

MPL
CIV
CIV
CIV
CIV
CIV
CIV

92 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

441

PEM

PH STR

442
443

PEM
PEM

PH STR
PH STR

444

PEM

PH STR

445

PEM

PH STR

446

PEM

PH STR

447

PEM

PH STR

448

PEM

PH STR

449

PEM

PH STR

450

PEM

PH STR

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-DWG-S-0084

PE-DG-391-612-C007

PH BLDG. -GA AND DETAILS OF GANTRY


GIRDERS

BTG-UMA-DWG-S-0017
BTG-UMA-DWG-S-0018

PE-DG-391-612-C008
PE-DG-391-612-C009

PH BLDG. -PURLIN DETAILS


PH BLDG.-DETAILS OF INTERMEDIATE
COLUMNS

I
I

BTG-UMA-DWG-S-0019

PE-DG-391-612-C010

PH BLDG -CLADDING FRAMING ELEVATION


ON AXIS A

BTG-UMA-DWG-S-0020

PE-DG-391-612-C011

PH BLDG -CLADDING FRAMING ELEVATION


ON AXIS C

BTG-UMA-DWG-S-0085

PE-DG-391-612-C012

PH BLDG. - DETAILS OF GABLE END COLUMNS I

BTG-UMA-DWG-S-0021

PE-DG-391-612-C013

PH BLDG. - FRAMING ARRGT. FOR AUXILIARY


STRUCTURES IN AB BAY

BTG-UMA-DWG-S-0086

PE-DG-391-612-C014

PH BLDG- CLADDING FRAMING OF GABLE END I

BTG-XXX-DWG-S-0022

PE-DG-391-612-C015

PH BLDG. -AB-BAY DETAILS OF MISC.


PLATEFORMS & STAIRS

BTG-UMA-DWG-S-0023

PE-DG-391-612-C016

PH BLDG. - DETAILS OF STAIRCASE A-B BAY.


MKD. SC-01 & SC-2

BTG-UMA-DWG-S-0024

PE-DG-391-612-C017

PH BLDG. -AB BAY-DETAILS OF STAIRCASE


MKD. SC-03

BTG-UMA-DWG-S-0025

PE-DG-391-612-C018

PH BLDG. -AB BAY-DETAILS OF STAIRCASE


MKD. SC-04

BTG-UMA-DWG-S-0026

PE-DG-391-612-C019

PH BLDG. -AB BAY-DETAILS OF STAIRCASE


MKD. SC-05

BTG-UMA-DWG-S-0087

PE-DG-391-612-C020

PH BLDG. -OIL CANAL FRAMING PLAN.

BTG-UMA-DWG-S-0088

PE-DG-391-612-C021

PH BLDG. -(AB BAY) FRAMING PLAN AT EL 3.5M I


FFL

BTG-UMA-DWG-S-0089

PE-DG-391-612-C022

PH BLDG. -(AB BAY-TG) FRAMING PLAN AT EL


8.5M FFL

BTG-UMA-DWG-S-0090

PE-DG-391-612-C023

PH BLDG. -(AB BAY-CR) FRAMING PLAN AT EL


8.5M FFL

BTG-UMA-DWG-S-0091

PE-DG-391-612-C024

PH BLDG.(AB BAY-TG) FRAMING PLAN AT EL


+12M FFL

BTG-UMA-DWG-S-0092

PE-DG-391-612-C025

PH BLDG.(AB BAY-TG) - FRAMING PLAN @ EL


17.0M FFL

BTG-UMA-DWG-S-0093

PE-DG-391-612-C026

PH BLDG.(AB BAY-CR) - FRAMING PLAN @ EL


17.0M FFL

Dept
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV

451

PEM

PH STR

452

PEM

PH STR

453

PEM

PH STR

454

PEM

PH STR

455

PEM

PH STR

456

PEM

PH STR

457

PEM

PH STR

458

PEM

PH STR

459

PEM

PH STR

460

PEM

PH STR

2X660 MW IB VALLEY TPS

CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV

93 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

461

PEM

PH STR

462

PEM

PH STR

463

PEM

PH STR

464

PEM

PH STR

465

PEM

PH STR

466

PEM

PH STR

467

PEM

PH STR

468

PEM

PH STR

469

PEM

PH STR

470

PEM

PH STR

471

PEM

PH STR

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-UMA-DWG-S-0094

PE-DG-391-612-C028

PH BLDG. - (BC-BAY-TG) FRAMING PLAN 8.5M


FFL

BTG-UMA-DWG-S-0095

PE-DG-391-612-C029

PH BLDG. - (BC-BAY-CR) FRAMING PLAN 8.5M


FFL

BTG-UMA-DWG-S-0096

PE-DG-391-612-C030

PH BLDG. - (BC-BAY-CR) FRAMING PLAN


+13.5M FFL

BTG-UMA-DWG-S-0097

PE-DG-391-612-C031

PH BLDG. - (BC-BAY-TG) FRAMING PLAN +17M I


FFL

BTG-UMA-DWG-S-0098

PE-DG-391-612-C032

PH BLDG. - (BC-BAY-CR) FRAMING PLAN +17M I


FFL

BTG-UMA-DWG-S-0099

PE-DG-391-612-C033

PH BLDG. - (BC-BAY-TG) FRAMING PLAN


+24.0M FFL

BTG-UMA-DWG-S-0100

PE-DG-391-612-C034

PH BLDG. - (BC-BAY-CR) FRAMING PLAN


+24.0M FFL

BTG-UMA-DWG-S-0101

PE-DG-391-612-C035

PH BLDG. - (BC-BAY) FRAMING PLAN +27.0M


FFL

BTG-UMA-DWG-S-0102

PE-DG-391-612-C036

PH BLDG. - (BC-BAY) FRAMING PLAN +31.75M


FFL

BTG-UMA-DWG-S-0103

PE-DG-391-612-C037

PH BLDG. - (BC-BAY) FRAMING PLAN +36.0M


FFL

BTG-UMA-DWG-S-0027

PE-DG-391-612-C040

PH BLDG. -PIPE AND CABLE SUPPORTING


STRUCTURE ALONG AXIS-C

BTG-XXX-DWG-S-0028
BTG-UMA-DWG-S-0104

PE-DG-391-612-C041
PE-DG-391-612-C037

PH BLDG. -MISC. DETAILS


PH BLDG. - (BC-BAY) FRAMING PLAN +36.0M
FFL

I
I

BTG-XXX-DWG-S-0029

PE-DG-391-611-C001

PH BLDG. -GEN. NOTES & STD. DETAIL FOR


ARCH WORKS

BTG-UMA-DWG-S-0044

PE-DG-391-611-C002

PH BLDG. -ARCHITECTURAL ELEVATION A


ROW

BTG-UMA-DWG-S-0045

PE-DG-391-611-C003

PH BLDG. -ARCHITECTURAL ELEVATION C


ROW

BTG-UMA-DWG-S-0046

PE-DG-391-611-C004

PH BLDG. -ARCHITECTURAL ELEVATION


ALONG GRID 1 (GABLE END)

BTG-UMA-DWG-S-0047

PE-DG-391-611-C005

PH BLDG. -ARCHITECTURAL ELEVATION


ALONG GRID 25 (GABLE END)

BTG-UMA-DWG-S-0105

PE-DG-391-616-C010

BUNKER BAY - FRAMING PLAN OF FEEDER


FLOOR

Dept
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV

472
473

PEM
PEM

PH STR
PH STR

474

PEM

PH STR

475

PEM

PH STR

476

PEM

PH STR

477

PEM

PH STR

CIV
CIV
CIV
CIV
CIV
CIV

478

PEM

PH STR
CIV

479

PEM

MILL STR

2X660 MW IB VALLEY TPS

CIV

94 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

480

PEM

MILL STR

481

PEM

MILL STR

482

PEM

MILL STR

483

PEM

MILL STR

484

PEM

RACKS

485

PEM

RACKS

486

PEM

RACKS

487

PEM

RACKS

488

PEM

RACKS

489

PEM

RACKS

490

PEM

RACKS

491

PEM

RACKS

492

PEM

RACKS

493

PEM

RACKS

494

PEM

RACKS

495

PEM

RACKS

496

PEM

O2 DOSING

497

PEM

CHEM
DOSING

498

PEM

CPU

499

PEM

MRS

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-UMA-DWG-S-0106

PE-DG-391-616-C011

BUNKER BAY - FRAMING PLAN OF TRIPPER


FLOOR

BTG-XXX-DWG-S-0034

PE-DG-391-616-C012

BUNKER BAY - FRAMING PLAN OF BUNKER


ROOF.

BTG-XXX-DWG-S-0035

PE-DG-391-616-C013

BUNKER'S BAY - CLADDING AND MIS.DETAILS

BTG-XXX-DWG-S-0036

PE-DG-391-616-C015

BUNKER BAY - DETAILS OF BUNKERS &


SUPPORTING DETAILS

BTG-UNY-DWG-S-0037

PE-DG-391-675-C001

PIPE RACK PR-1 - FOUNDATION LOADING I

BTG-UMY-DWG-S-0038

PE-DG-391-675-C002

PIPE RACK PR-1 - STRUCTURAL STEEL


DETAILS

BTG-UNY-DWG-S-0039

PE-DG-391-675-C003

PIPE RACK PR-2 -FOUNDATION LOADING I

BTG-UMY-DWG-S-0040

PE-DG-391-675-C004

PIPE RACK PR-2 - STRUCTURAL STEEL


DETAILS

BTG-UNY-DWG-S-0041

PE-DG-391-675-C005

PIPE RACK PR-3 - FOUNDATION LOADING I

BTG-UMY-DWG-S-0042

PE-DG-391-675-C006

PIPE RACK PR-3 - STRUCTURAL STEEL


DETAILS

BTG-UNY-DWG-S-0043

PE-DG-391-675-C007

PIPE RACK PR-4 - FOUNDATION LOADING I

BTG-UMY-DWG-S-0044

PE-DG-391-675-C008

PIPE RACK PR-4 - STRUCTURAL STEEL


DETAILS

BTG-UNY-DWG-S-0045

PE-DG-391-675-C009

PIPE RACK PR-5 - FOUNDATION LOADING I

BTG-UMY-DWG-S-0046

PE-DG-391-675-C010

PIPE RACK PR-5 - STRUCTURAL STEEL


DETAILS

BTG-UNY-DWG-S-0047

PE-DG-391-675-C011

PIPE RACK PR-6 - FOUNDATION


LOADING

BTG-UMY-DWG-S-0048

PE-DG-391-675-C012

PIPE RACK PR-6 - STRUCTURAL STEEL


DETAILS

BTG-LFN-DWG-M-0145

PE-V0-391-154-AXXX

VENDOR DWGS FOR OXYGEN DOSING


SYSTEM

BTG-LFN-DWG-M-0146

PE-V0-391-154-AXXX

VENDOR DWGS FOR CHEMICAL DOSING


SYSTEM

BTG-LD-DWG-M-0147

PE-V0-391-155-AXXX

VENDOR DWGS FOR CONDENSATE


POLISHING UNIT

BTG-HFE-DWG-M-0148

PE-V0-391-160-AXXX

VENDOR DWGS FOR MILL REJECT HANDLING A


SYSTEM

Dept
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
CIV
MAX
MAX
MAX
MAX

95 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

BTG-XXX-DWG-M-0149

PE-V0-391-167-AXXX

VENDOR DWGS FOR MISC. TANKS ( SITE


FABRICATED)

BTG-SML-DWG-M-0150

PE-V0-391-501- AXXX

VENDOR DWGS FOR D/G EOT CRANE UPTO 50 A


T CAPCITY

BTG-SML-DWG-M-0151

PE-V0-391-501- AXXX

VENDOR DWGS FOR D/G EOT CRANE MORE


THAN 50 T CAPCITY

BTG-SML-DWG-M-0152

PE-V0-391-524- AXXX

VENDOR DWGS FOR S/G EOT/HOT CRANE

BTG-SML-DWG-M-0153

PE-V0-391-563- AXXX

VENDOR DWGS FOR CHAIN PULLEY BLOCKS

BTG-SM-DWG-E-0166

PE-V0-391-563-AXXX

VENDOR DWGS FOR ELELCTRIC HOISTS

BTG-SNM-DWG-M-0154

PE-V0-391-502- AXXX

VENDOR DWGS FOR ELEVATORS

BTG-SAL-DWG-M-0155

PE-V0-391-553- AXXX

VENDOR DWGS FOR AIR CONDITIONING


SYSTEM

BTG-SAL-DWG-M-0156

PE-V0-391-554- AXXX

VENDOR DWGS FOR VENTILATION SYSTEM

BTG-SCB-DWG-M-0157

PE-V0-391-555- AXXX

VENDOR DWGS FOR COMPRESSED AIR


SYSTEM

BTG-XXX-DWG-M-0158

PE-V0-391-567- AXXX

VENDOR DWGS FOR LUBE OIL TRANSFER


PUMPS

Dept

500

PEM

CST

501

PEM

D/G EOT
CRANE

MAX

502

PEM

D/G EOT
CRANE

MAX

503

PEM

S/G EOT/HOT
CRANE

MAX

MAX

504

PEM

CPB

505

PEM

E HOIST

506

PEM

ELEVATOR

507

PEM

AC

508

PEM

VENTILATION

509

PEM

COMPRESSE
D AIR

510

PEM

L O PUMPS

511
512

PC
PC

MDL
P&ID

Err:512
BTG-XXX-DWG-M-0159

4-00-306-40221
0-00-303-31371

MASTER DRAWING LIST-PC


Scheme of cooling water supply & return

513
514

PC
PC

P&ID
P&ID

BTG-XXX-DWG-M-0160
BTG-LPG-DWG-M-0161

0-00-301-31372
1-00-305-32576

Scheme of LP start-up system


Scheme of aux. Steam to Scaph & Scaph drain

515

PC

P&ID

BTG-SCB-DWG-M-0162

1-00-301-32577

Scheme of Instrument air

516

PC

P&ID

BTG-SCB-DWG-M-0163

1-00-301-32578

Scheme of Service air

517

PC

P&ID

BTG-PCB-DWG-M-0164

1-00-305-32579

Scheme of APHWW & FF

518

PC

P&ID

BTG-HFE-DWG-M-0165

2-00-305-31717

Scheme of aux. Steam piping to Mill inerting


system

519
520

PC
PC

P&ID
P&ID

BTG-PC-DWG-M-0166
BTG-XXX-SCH-M-0169

2-00-305-31718
4-00-306-40095

Scheme of service water to mills


Valve schedule of aux. Steam to SCAPH & SCAPH
drains

MAX
MAX
MAX
MAX
MAX
MAX
MAX

96 OF 276

I
A
A
A
A
A
A
A
A
I

1 (i)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

521

PC

P&ID

BTG-LPG-SCH-M-0170

4-00-306-40096

Valve schedule cooling water supply and return

522
523
524

PC
PC
PC

P&ID
P&ID
P&ID

BTG-SCB-SCH-M-0171
BTG-SCB-SCH-M-0172
BTG-PCB-SCH-M-0173

4-00-306-40097
4-00-306-40098
4-00-306-40099

Valve schedule of instrument air


Valve schedule of service air
Valve schedule of service water to Mills

I
I

525
526

PC
PC

P&ID
P&ID

BTG-PCB-SCH-M-0174
BTG-LPG-SCH-M-0175

4-00-306-40100
4-00-306-40101

Valve schedule of APH WW & FF


Valve schedule of aux. Steam piping to mill inerting

527
528
529
530
531

PC
PC
PC
PC
PC

P&ID
P&ID
P&ID
P&ID
P&ID

BTG-HAA-SCH-M-0178
BTG-XXX-SCH-M-0179
BTG-XXX-SCH-I-0055

4-00-306-40122
4-00-306-40108
3-81-411-02614
3-81-412-02673
3-81-412-02674

Valve schedule of LP start-up system


Pipe Schedule
Instrument Schedule
Installation of pressure instruments
Installation of temperature stub for temperature
gauges

I
I
I
I

532
533
534
535
536
537

PC
PC
PC
PC
PC
PC

P&ID
P&ID
P&ID
P&ID
P&ID
P&ID

3-81-412-02675
3-81-412-02676
3-81-414-05480
3-81-414-05298
3-81-414-05479
3-81-414-05478

Installation of level gauges


Installation of level switches
Control valve schedule
Requirement of instrument air list
Schedule of motors and MOVs
List of transmitters and temperature element

I
I
I
I
A

538

PC

PIPING
LAYOUT

BTG-XXX-DWG-M-0180

0-00-307-31397

Layout of NonCritical Piping in Boiler Area

539

PC

PIPING
LAYOUT

BTG-XXX-DWG-M-0181

0-00-307-31398

Layout of LP Piping in Boiler Area

540
541

JHS
JHS

MDL
PWR TRFR

Err:512
BTG-XXX-DSH-M-0182

JHS-MDL-001
TRE/70879-80A/TDS

MASTER DRAWING LIST-JHS


Technical Data Sheet for 16 MVA UAT & SAT

542

JHS

PWR TRFR

BTG-BBT-MNL-E-0522

TRE/70879-80A/O&M

O & M Manual for 16 MVA UAT & SAT

543

JHS

PWR TRFR

BTG-BBT-QAD-E-0523

544

JHS

PWR TRFR

BTG-BBT-DWG-E-0507

14560050843

Outline General Arrangement for 16 MVA UAT &


SAT

545

JHS

PWR TRFR

BTG-UMC-DWG-S-0050

24560050915

Foundation Plan of 16 MVA UAT & SAT

546

JHS

PWR TRFR

BTG-BBT-DWG-E-0167

34560051838

Roller Assembly of 16 MVA UAT & SAT

547

JHS

PWR TRFR

BTG-BBT-DWG-E-0508

14561951394

Rating & Diagram plate of 16 MVA UAT & SAT

A
I
I
A

4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (iii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
6 (ii)
6 (ii)
1 (i)

A
I

Quality Plan for Power Transformer

97 OF 276

4 (iii)

I
A

2 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)
I

Dept

548

JHS

PWR TRFR

BTG-BBT-DWG-E-0168

24560050916

HV Cable Box Assy of 16 MVA UAT & SAT

549

JHS

PWR TRFR

BTG-BBT-DWG-E-016

34560051840

HV Bushing Assy of 16 MVA UAT & SAT

550

JHS

PWR TRFR

BTG-BBT-DWG-E-0170

34560051841

LV & LVN Bushing Assy of 16 MVA UAT & SAT

551

JHS

PWR TRFR

BTG-BBT-DWG-E-0171

34561951011

Caution Plate for Tap Switch of 16 MVA UAT & SAT

552

JHS

PWR TRFR

BTG-BBT-DWG-E-0172

G A of Marshalling Box of 16 MVA UAT & SAT

553

JHS

PWR TRFR

BTG-BBT-DWG-E-0509

Diagram of Cooler control gear of 16 MVA UAT &


SAT

554

JHS

PWR TRFR

BTG-BBT-SCH-E-0173

TRE/70879-80A/CITS

Customer Inspection Test Schedule of 16 MVA UAT A


& SAT

555

JHS

PWR TRFR

BTG-BBT-DSH-E-0174

TRE/70878A/TDS

Technical Data Sheet for 50 MVA UT

556

JHS

PWR TRFR

BTG-BBT-DWG-E-0510

14560050844

Outline General Arrangement with Table of fittings


for 50 MVA UT

557

JHS

PWR TRFR

BTG-BBT-DWG-E-0175

34560051842

HV Bushing Assy of 50 MVA UT

558

JHS

PWR TRFR

BTG-BBT-DWG-E-0176

34560051843

LV & LVN Bushing Assy of 50 MVA UT

559

JHS

PWR TRFR

BTG-UMC-DWG-S-0051

24560050917

Foundation Plan of 50 MVA UT

560

JHS

PWR TRFR

BTG-BBT-DWG-E-0177

14561951395

Rating & Diagram plate of 50 MVA UT

561

JHS

PWR TRFR

BTG-BBT-DWG-E-0178

34560051844

Roller Assembly of 50 MVA UT

562

JHS

PWR TRFR

BTG-BBT-DWG-E-0179

G A of Marshalling Box of 50 MVA UT

563

JHS

PWR TRFR

BTG-XXX-DWG-I-0056

DIAGRAM OF COOLER CONTROL GEAR of 50


MVA UT

564

JHS

PWR TRFR

BTG-BBT-DWG-E-0180

SCHEMATIC DIAGRAM FOR OLTC of 50 MVA UT A

565

JHS

PWR TRFR

BTG-BBT-SCH-E-0181

TRE/70878A/CITS

Customer Inspection Test Schedule of 50 MVA UT A

566

JHS

DTT

BTG-BFT-DSH-E-0182

TRE/WO70881-82A/DS

Technical Data Sheet for 2500 KVA DTT

567
568

JHS
JHS

DTT
DTT

Err:512
BTG-BFT-DWG-E-0183

3 473 00 51718

Quality Plan for Dry Type Transformer


Outline General Arrangement of 2500 KVA DTT

98 OF 276

I
I
I

A
A
I
I
A
A
I

A
A
A

2 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

569

JHS

DTT

BTG-BFT-LIST-E-0184

3 473 00 51719

List of Fittings for OGAof 2500 KVA DTT

570

JHS

DTT

BTG-BFT-DWG-E-0185

3 473 00 51720

Details and Notes for OGA of 2500 KVA DTT

571

JHS

DTT

BTG-BFT-DWG-E-0186

3 473 19 50931

Rating and Diagram Plateof 2500 KVA DTT

572
573

JHS
JHS

DTT
DTT

BTG-BFT-DWG-E-0187
Err:512

3 473 00 51721
TRE/WO70881-82A/O&M

Marshalling Box of 2500 KVA DTT


O & M Manual for 2500 KVA DTT

574
575
576
577

JHS
JHS
JHS
JHS

DTT
DTT
DTT
DTT

BTG-BFT-DWG-E-0188
BTG-BFT-DWG-E-0189
BTG-BFT-DWG-E-0190
BTG-BFT-SCH-E-0191

3 473 06 50695
3 473 62 50338
3 473 03 50255
TRE/WO70881A/TI

H.V Cable Box Assy of 2500 KVA DTT


Wiring Diagram of 2500 KVA DTT
H.V Bushing Epoxy of 2500 KVA DTT
Test Instruction Schedule of 2500 KVA DTT

578

JHS

DTT

BTG-BFT-DSH-E-0192

TRE/WO70881-82A/DS

Technical Data Sheet of 1600 KVA DTT

579
580

JHS
JHS

DTT
DTT

Err:512
BTG-BFT-DWG-E-0193

TRE/WO70881-82A/DS
3 473 00 51722

O & M Manual of 1600 KVA DTT


Outline General Arrangement of 1600 KVA DTT

I
A

581

JHS

DTT

BTG-BFT-LIST-E-0194

3 473 00 51723

List of Fittings for OGA of 1600 KVA DTT

582

JHS

DTT

BTG-BFT-DWG-E-0195

3 473 00 51724

Details and Notes for OGA of 1600 KVA DTT

583

JHS

DTT

BTG-BFT-DWG-E-0196

3 473 19 50932

Rating and Diagram Plate of 1600 KVA DTT

584
585
586
587
588

JHS
JHS
JHS
JHS
JHS

DTT
DTT
DTT
DTT
DTT

BTG-BFT-DWG-E-0197
BTG-BFT-DWG-E-0198
BTG-BFT-DWG-E-0199
BTG-BFT-DWG-E-0200
BTG-BFT-SCH-E-0201

3 473 00 51725
3 473 06 50696
3 473 62 50339
3 473 03 50256
TRE/WO70882A/TI

Marshalling Box of 1600 KVA DTT


H.V Cable Box Assy of 1600 KVA DTT
Wiring Diagram of 1600 KVA DTT
H.V Bushing Epoxy of 1600 KVA DTT
Test Instruction Schedule of 1600 KVA DTT

589

JHS

ESP TRFR

BTG-BFT-DSH-E-0202

TRE/WO70883A/DS

Technical Data Sheet for 95KVp ESP TRFR

590

JHS

PWR TRFR

Err:512

591

JHS

ESP TRFR

Err:512

TRE/WO70883A/O&M

O & M Manual for 95KVp ESP TRFR

592

JHS

ESP TRFR

BTG-BFT-DWG-E-0203

1 467 00 50392

Outline General Arrangement for 95KVp ESP


TRFR

593

JHS

ESP TRFR

BTG-BFT-DWG-E-0204

2 467 00 50703

Rating and Diagram Plate for 95KVp ESP TRFR

I
I
I
A
A

I
I
I
I
A
A

Quality Plan for ESP TRFR

99 OF 276

2 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

594

JHS

ESP TRFR

BTG-BFT-DWG-E-0205

3 467 62 50682

Wiring Diagram for 95KVp ESP TRFR

595

JHS

ESP TRFR

BTG-BFT-DWG-E-0206

3 467 62 50683

GA of Thermometer Box for 95KVp ESP TRFR

596

JHS

ESP TRFR

BTG-BFT-SCH-E-0207

TRE/WO70883A/TI

Test Instruction Schedule for 95KVp ESP TRFR

597

HWR

MDL

Err:512

HWR-1810-MDL-001

MASTER DRAWING LIST-HWR

598

HWR

HXE

BTG-LC-DWG-M-0183

CONDENSER ASSEMBLY - GA

599

HWR

HXE

BTG-LC-DWG-M-0184

COND. PERFORMANCE CURVE

600

HWR

HXE

BTG-LC-DSH-M-0185

CONDENSER DATA SHEET

601

HWR

HXE

BTG-UMC-DWG-S-0052

EMBEDMENT DETAILS IN CONDENSER


PEDESTAL

602

HWR

HXE

BTG-XXX-DWG-I-0057

CONDENSER - INSTALLATION OF LEVEL


INSTRUMENTS

603

HWR

HXE

BTG-LC-DWG-M-0186

GA OF GLAND STEAM CONDENSER

604
605

HWR
HWR

HXE
HXE

BTG-LC-DSH-M-0187
BTG-LCC-DWG-M-0188

GSC DATA SHEET


LPH-1 GA

606

HWR

HXE

BTG-LCC-DSH-M-0189

LPH-1 DATA SHEET

607

HWR

HXE

BTG-MAJ-DWG-M-0190

VACUUM PUMP PACKAGE-GA

608

HWR

HXE

BTG-XXX-DWG-M-0191

H2 COOLER - GA

609

HWR

HXE

BTG-XXX-DSH-M-0192

H2 COOLER - DATA SHEET

610

HWR

HXE

BTG-XXX-DWG-M-0193

EXCITER AIR COOLER -GA

611

HWR

HXE

BTG-XKC-DSH-E-0208

EXCITER AIR COOLER DATA SHEET

612

HWR

HXE

BTG-MAJ-DWG-M-0451

P & ID OF VACUUM PUMP

613

HWR

HXE

BTG-LC-MNL-M-0194

O&M MANUAL-CONDENSER

614

HWR

HXE

BTG-XXX-CAL-M-0195

Condenser Thermal & Hydraulic Calculations

100 OF 276

I
I
A
A
A

1 (i)
2 (vii)

A
A

4 (ii)

I
I
I
I

4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

615

HWR

HXE

BTG-XXX-DWG-M-0196

TOC GA Drawing of Turbine Oil Cooler

616

HWR

HXE

BTG-XXX-DSH-M-0197

Datasheet of Turbine Oil Cooler

617

HWR

EME

BTG-MKA-DWG-E-0209

GENERATOR OUTLINE

618

HWR

EME

BTG-XKC-DWG-E-0500

EXCITER OUTLINE (GA DRAWING)

619

HWR

EME

BTG-UMC-DWG-S-0053

FOUNDATION DETAILS FOR GENERATOR


AUXILIARY EQUIP.

620

HWR

EME

BTG-UMC-DWG-S-0054

EXCITER OUTLINE -FOUNDATION DETAILS

621

HWR

EME

BTG-MKA-DWG-E-0210

LAYDOWN SPACE FOR GENERATOR


COMPONENTS

622

HWR

EME

BTG-MKA-DWG-I-0058

GENERATOR INSTRUMENTATION SCHEME

623

HWR

EME

BTG-MKC-DWG-I-0059

EXCITER INSTRUMENTATION SCHEME

624

HWR

EME

BTG-XXX-DWG-M-0198

GENERATOR GAS SYSTEM SCHEME

625

HWR

EME

BTG-XXX-DWG-M-0199

GENERATOR SEAL OIL SYSTEM SCHEME

626

HWR

EME

BTG-XXX-DWG-M-0200

PRIMARY WATER SYSTEM SCHEME

627

HWR

EME

BTG-XXX-DWG-M-0201

GENERATOR WASTE FLUID SYSTEM SCHEME A

628

HWR

EME

BTG-XXX-DWG-M-0202

GENERATOR WASTE GAS SYSTEM SCHEME

629

HWR

EME

BTG-MKA-DSH-E-0211

GENERATOR -DATA SHEET &CURVES

630

HWR

EME

BTG-XXX-DWG-M-0203

GENERATOR PIPING PLANS

631

HWR

EME

BTG-XXX-DWG-M-0204

COOLING WATER PIPING TO H2 COOLER

632

HWR

EME

BTG-MKA-DWG-E-0212

ERECTION DRGs- GENERATOR

633

HWR

EME

BTG-MKA-MNL-E-0213

O&M MANUAL - GENERATOR

634

HWR

EME

BTG-XXX-DWG-M-0205

GA Drawing of Seal Oil Cooler

101 OF 276

I
I
I
I
I

2 (vii)
2 (vii)
3 (v)
3 (v)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

635

HWR

EME

BTG-XXX-DSH-M-0206

Datasheet of Seal Oil Cooler

636

HWR

EME

BTG-XXX-LIST-M-0207

List of Valves for TG Aux. System

637

HWR

EME

BTG-XXX-LIST-M-0208

Terminal Point List for Generator Pipe


Connection

638
639

HWR
HWR

STE
STE

BTG-MA-DWG-M-0209
BTG-MAP-DWG-M-0210

STEAM TURBINE GA DRG


LP Bypass Valve- Drawing

640

HWR

STE

BTG-XXX-DWG-M-0211

BASE PLATE ASSEMBLY

641

HWR

STE

BTG-XXX-DWG-M-0212

Arrangement of Embedment for Anchor Points

642

HWR

STE

BTG-XXX-PCD-S-0055

FOUNDATION DESIGN WRITE UP

643

HWR

STE

BTG-XXX-DWG-M-0213

ERECTION DRGs- STEAM TURBINE

644

HWR

STE

Err:512

O & M MANUAL STEAM TURBINE

645

HWR

STE

BTG-XXX-DWG-M-0214

GA Drawing of HPSU Cooler

646

HWR

STE

BTG-XXX-DWG-M-0215

Turbine Start up Curves

647
648

HWR
HWR

PED
PED

BTG-XXX-DWG-M-0216
BTG-XXX-DSH-S-0056

LPBP VALVE ARRANGEMENT


FOUNDATION LOADS, SHEET 1

649

HWR

PED

BTG-XXX-DSH-S-0057

FOUNDATION LOADS, SHEET 2

650

HWR

PED

BTG-XXX-DWG-S-0058

FOUNDATION PLAN, SHEET 1 - TOP VIEW


SECTION A-A

651

HWR

PED

BTG-XXX-DWG-S-0059

FOUNDATION PLAN, SHEET 2 - SECTIONS

652

HWR

PED

BTG-XXX-DWG-S-0060

FOUNDATION PLAN, SHEET 3 - OVERVIEW


GROUT TOPPING

653

HWR

PED

BTG-XXX-DWG-M-0217

STORAGE SPACE (LAYDOWN SPACE FOR ST


COMPONENTS)

654

HWR

PED

BTG-XXX-DWG-S-0061

FOUNDATION PLAN (SUPP)

655

HWR

PED

BTG-XXX-DWG-S-0062

FOUNDATION PLAN (SUPP)

I
I

2 (vii)
2 (vii)

I
I
I

4 (i)

for ESV, IV & I

OLV

102 OF 276

I
I
I
I
I
I

I
I

2 (vii)
3 (v)
3 (v)
3 (v)
3 (v)
3 (v)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

Dept

656

HWR

PED

BTG-XXX-DWG-S-0063

FOUNDATION PLAN (SUPP)

657

HWR

PED

BTG-XXX-LIST-M-0220

LIST OF EMBEDDED PARTS

658

HWR

PED

BTG-XXX-DSH-S-0064

FOUNDATION DETAILS OF HPSU FOR ESV, IV


AND OV VALVES

659

HWR

PED

BTG-UMC-DSH-S-0065

FOUNDATION DETAILS OF HPSU FOR IPBV

660

HWR

PED

BTG-UMA-DSH-S-0066

REQUIREMENT OF BEAM BELOW TG DECK

661

HWR

PED

BTG-XXX-DSH-M-0221

OIL CANAL DETAILS

662

HWR

PED

BTG-XXX-DWG-M-0222

OIL ROOM ARRANGEMENT

663

HWR

PED

BTG-XXX-DSH-M-0223

SPACE REQUIRED FOR CONDENSATE WATER


SPRAY STATION FOR IPBV

LNTP
Purpose reference
(I/ A)
I
I
I
I

4 (ii)

I
I
I
I

664

HWR

PED

BTG-UMA-DWG-S-0067

PLATFORM BELOW TG DECK

665

HWR

PED

BTG-XXX-DWG-M-0224

GENERAL ARRANGEMENT WASTE OIL TANK

666

HWR

PED

BTG-XXX-DWG-M-0225

GENERAL ARRANGEMENT LEAKAGE/DIRTY


OIL TANK

667

HWR

PED

BTG-XXX-DWG-S-0107

PIT & EMBEDDED PLATE FOR TURBINE


DRAINAGE PIPING

668

HWR

PED

BTG-UMC-DWG-S-0108

ASSEMBLY PLATFORM FOR OV BELOW TG


DECK

669

HWR

PED

BTG-XXX-DWG-M-0226

SUSPENSION OF LP BYEPASS VALVE

670

HWR

PED

BTG-XXX-DWG-M-0227

GRAPHICAL SYBBOLS FOR PIPING , VALVES


AND INSTRUMENTATION (LEGEND)

671

HWR

PED

BTG-XXX-DSH-M-0228

SEAL STEAM SYSTEM

672

HWR

PED

BTG-XXX-DSH-M-0229

SPINDLE LEAK-OFF STEAM SYSTEM

673

HWR

PED

BTG-XXX-DWG-M-0230

TURBINE DRAINAGE SYSTEM SCHEME

674

HWR

PED

BTG-MAN-DSH-M-0231

IP-BYPASS STEAM SYSTEM

103 OF 276

4 (ii)

I
I

4 (ii)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

675

HWR

PED

BTG-XXX-DSH-M-0232

HP-IP-LP TURBINE SYSTEM

676

HWR

PED

BTG-MAX-DSH-I-0060

CONTROL FLUID SYSTEM

677

HWR

PED

BTG-MAN-DSH-M-0233

CONTROL FLUID (BYPASS) SYSTEM

678

HWR

PED

BTG-XXX-DSH-M-0234

OIL MODULE 2 SYSTEM

679

HWR

PED

BTG-XXX-DSH-M-0235

OIL VAPOUR EXHAUST SYSTEM

680

HWR

PED

BTG-XXX-DSH-M-0236

LIFTING OIL SYSTEM

681

HWR

PED

LIFTING OIL SYSTEM

682

HWR

PED

BTG-XXX-DSH-M-0238

PRESSURE OIL / RETURN FLOW SYSTEM

683

HWR

PED

BTG-QSV-DWG-M-0239

CW SCHEME - LUB OIL COOLERS

684

HWR

PED

BTG-XXX-DWG-M-0240

COOLING WATER SCHEME - CONTROL FLUID


COOLERS

685

HWR

PED

BTG-QSV-DWG-M-0241

LUBE OIL SYSTEM SCHEME(LEAKAGE/ WASTE A


OIL)

686

HWR

PED

BTG-XXX-DSH-M-0242

VALVE DETAILS ( TURBINE INTEGRAL SYS) )

687

HWR

PED

BTG-QSV-DWG-M-0243

LUB OIL COOLING WATER PIPING LAYOUTS

688

HWR

PED

BTG-QSV-DWG-M-0244

LUB OIL PIPING LAYOUTS

689

HWR

PED

BTG-XXX-DWG-M-0245

SEAL STEAM PIPING LAYOUTS

690

HWR

PED

BTG-XXX-DWG-M-0246

TURBINE DRAINAGE PIPING LAYOUTS

691

HWR

PED

BTG-XXX-DWG-M-0247

CONDENSATE SPRAY PIPING LAYOUTS

692

HWR

PED

BTG-XXX-DWG-M-0248

CF PIPING LAYOUTS (ESV, IV, OLV)

693

HWR

PED

BTG-XXX-DWG-M-0249

CONTROL FLUID PIPING (IPBP) LAYOUTS

694

HWR

PED

BTG-XXX-DWG-M-0250

COOLING WATER PIPING (CF COOLER)


LAYOUTS

BTG-XXX-DSH-M-0237

104 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

LNTP
Purpose reference
(I/ A)

OVERLOAD PIPING LAYOUTS

Dept

695

HWR

PED

BTG-XXX-DWG-M-0251

696

HWR

CIE

BTG-XXX-LIST-E-0214

418000C5020

List of Junction boxes

697

HWR

CIE

BTG-XXX-LIST-I-0061

418000C5002

List of Annunciations

698

HWR

CIE

BTG-XXX-DWG-I-0062

ATRS Logics Evacuation

699

HWR

CIE

BTG-XXX-DWG-I-0167

FUNCTIONAL DIAGRAM FOR TURBINE


CONTROLS

700

HWR

CIE

BTG-MKY-DWG-E-0215

FUNCTIONAL DIAGRAM FOR GENERATOR


CONTROLS

701

HWR

CIE

BTG-MKA-LIST-E-0501

702

HWR

CIE

BTG-XXX-DWG-I-0063

703

HWR

CIE

BTG-XXX-PCD-I-0064

418000C5413

W/UP ON KKS CLASSIFICATION SYSTEM

704

HWR

CIE

BTG-XXX-DWG-I-0065

418000C5278

DC EOP STARTER PANEL SCHEME

705

HWR

CIE

BTG-XXX-DWG-I-0066

418000C5279

DC SOP STARTER PANEL SCHEME

706

HWR

CIE

BTG-XXX-DWG-I-0067

418000C5277

DC JOP STARTER PANEL SCHEME

707

HWR

CIE

BTG-XXX-DWG-I-0147

418000C5275

GAS ANALYSER SCHEME

708

HWR

CIE

BTG-XXX-PCD-I-0068

418000C5274

System Description of TG C&I

709

HWR

CIE

BTG-XXX-DWG-I-0069

418000C5153

FEEDER TYPES (RECOMMENDED)

710

HWR

CIE

BTG-XXX-LIST-I-0070

418000C5011

MEASURING POINT LIST (GEN. INSTRUMENT


LIST)

711

HWR

CIE

BTG-XXX-LIST-I-0071

418000C5020

INSTRUMENTS LIST (ST)

712

HWR

CIE

BTG-XXX-DWG-E-0216

418000C5276

OGA FOR TURBINE- GENERATOR AUXILIARY


CONTROL CABINETS

713

HWR

CIE

BTG-XXX-DWG-E-0217

418000C5222

CABLING DIAGRAM- ST

714

HWR

CIE

BTG-XXX-PCD-I-0168

418000C5417

W/UP ON GENERATOR C&I

418000C5151

LIST OF FEEDER LOADS


Control system Configuration Drg

105 OF 276

I
I

3 (iv)

I
A
A
A
I
I
A
A
A
A
I
I

4 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

715

HWR

CIE

BTG-XXX-DWG-I-0072

418000C5420

W/UP ON PW & COLD GAS TEMP CONTROL

716

HWR

CIE

BTG-XXX-PCD-I-0148

418000C5426

WRITE UP ON AUTOMATIC TURBINE TESTER

717

HWR

CIE

BTG-XXX-PCD-I-0073

418000C5408

WRITE UP ON TURBINE SUPERVISORY


INSTRUMENTATION SYSTEM

LNTP
Purpose reference
(I/ A)
I
I
I

718

HWR

CIE

BTG-XXX-PCD-I-0149

418000C5427

WRITE UP ON TURBINE STRESS CONTROLLER

719

HWR

CIE

BTG-XXX-PCD-I-0150

418000C5401

WRITE-UP ON TURBINE PROTECTION SYSTEM

720

HWR

CIE

BTG-XXX-PCD-I-0074

418000C5421

WRITE-UP ON ATRS

721

HWR

CIE

BTG-XXX-PCD-I-0075

418000C5422

WRITE UP ON ELECTRO-HYDRAULIC
CONTROLLER

722

HWR

CIE

BTG-XXX-PCD-I-0076

418000C5407

W -UP ON GLAND SEAL STEAM PRESSURE


CONTROL

723

HWR

CIE

BTG-XXX-DWG-E-0218

418000C5021

MESAURING PTS ON TURBINE & GENERATOR I


BRGS

724

HWR

CIE

BTG-XXX-DWG-I-0078

418000C5022

TURBINE VALVES SENSOR ARRGMNT

725

HWR

CIE

BTG-XXX-DWG-I-0151

418000C5023

EXPANSION, VIBRATION & VALVE POSITION


MEASUREMENT

726

HWR

CIE

BTG-XXX-DWG-I-0079

418000C5261

SGC-HPSU (LP BYPASS) LOGIC

727

HWR

CIE

BTG-XXX-DWG-I-0080

418000C5112

TURBINE TRIP SYSTEM LOGICS

728

HWR

CIE

BTG-XXX-PCD-I-0081

418000C5115

W/UP & LOGIC FOR EHA TYPE LP BYPASS TRIP I


SYSTEM

729

HWR

CIE

BTG-XXX-PCD-I-0082

418000C5440

W-UP EHA LP BYPASS CONTROL SYSTEM

730

HWR

CIE

BTG-XXX-DSH-I-0083

418000C5441

WATER INJECTION CONTROLLER -EHA LP


BYPASS SYSTEM

731

HWR

CIE

BTG-XXX-DWG-I-0084

ARRANGEMENT OF I & C CABINETS FOR


TURBINE CONTROL

732

HWR

CIE

BTG-XXX-DSH-I-0085

EMERGENCY PUSH BUTTONS CONCEPT

733

HWR

CIE

BTG-XXX-LIST-I-0086

SIGNAL EXCHANGE LIST

734

HWR

CIE

BTG-XXX-DSH-I-0087

Erection drgs- C&I

106 OF 276

I
I
I

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

2X660 MW IB VALLEY TPS

Drawing/document title

LNTP
Purpose reference
(I/ A)

Cable schedule

Dept

735

HWR

CIE

BTG-XXX-SCH-E-0219

736

EDN

MDL

Err:512

EN-DG-1050-145-0001

MASTER DRAWING LIST-EDN

737

EDN

C&I-DAVR

BTG-XXX-DWG-I-0152

EN-DG-1050-145-1001

OGA DRAWING

738

EDN

C&I-DAVR

BTG-XXX-DWG-I-0089

EN-DG-1050-145-1002

AVR SCHEME

739

EDN

C&I-DAVR

BTG-XXX-DSH-I-0090

EN-DG-1050-145-1003

TEST PROTOCOL

740

EDN

C&I-DAVR

Err:512

EN-DG-1050-145-1004

QUALITY PLAN

741

EDN

C&I-DAVR

BTG-XXX-MNL-I-0091

EN-DG-1050-145-1005

O &M MANUALS FOR AVR

742

EDN

C&I-SG

BTG-XXX-PCD-I-0092

EN-DG-1050-145-2001

WRITE UP ON SG C&I PACKAGE - EDN's Scope

743

EDN

C&I-SG

Err:512

EN-DG-1050-145-2002

O & M MANUAL FOR SG C&I PACKAGE - EDN's


Scope

744

EDN

C&I-SG

BTG-CWA-DWG-I-0093

EN-DG-1050-145-2003

Console OGA

745

EDN

C&I-SG

BTG-XXX-SCH-E-0220

EN-DG-1050-145-2004

CABLE SCHEDULE-SG

746

EDN

C&I-TG

BTG-XXX-PCD-I-0094

EN-DG-1050-145-3001

WRITE UP ON TG C&I PACKAGE - EDN's Scope

747

EDN

C&I-TG

Err:512

EN-DG-1050-145-3002

O & M MANUAL FOR TG C&I PACKAGE - EDN's


Scope

748

EDN

C&I-TG

BTG-XXX-SCH-E-0221

EN-DG-1050-145-3003

CABLE SCHEDULE-TG

749

EDN

C&I-HMI

BTG-XXX-DSH-I-0095

EN-DG-1050-145-4002

HMI SYSTEM DESCRIPTION

750

EDN

C&I-HMI

BTG-XXX-DSH-I-0096

EN-DG-1050-145-4003

HMI - BILL OF MATERIAL

751

EDN

C&I-HMI

BTG-XXX-DSH-I-0097

EN-DG-1050-145-4004

DATA SHEET, BOM FOR LARGE VIDEO


SCREEN

752

EDN

C&I-HMI

BTG-XXX-DSH-E-0222

EN-DG-1050-145-4005

DATA SHEET,DRG T FOR FIBRE OPTIC CABLE

753

EDN

C&I-HMI

BTG-CWA-DWG-I-0098

EN-DG-1050-145-4006

OPERATOR DESK & FURNITURE - OVERALL


GENERAL ARRANGEMENT

754

EDN

C&I-HMI

BTG-CWA-DSH-I-0099

EN-DG-1050-145-4007

DATA SHEET FOR OPERATOR DESK

107 OF 276

A
I
A
I
A

1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

755

EDN

C&I-HMI

BTG-XXX-DSH-I-0153

EN-DG-1050-145-4008

DATA SHEET FOR FURNITURE

756

EDN

C&I-HMI

Err:512

EN-DG-1050-145-4009

O &M MANUALS FOR HMI

757

EDN

C&I-BOP

BTG-XXX-DWG-I-0100

EN-DG-1050-145-5001

CONTROL SYSTEM CONFIGURATION


DRAWING

758

EDN

C&I-BOP

BTG-XXX-DSH-I-0154

EN-DG-1050-145-5001

FUNCTION GROUPING DOCUMENT


-SG,TG,BOP

759

EDN

C&I-BOP

Err:512

EN-DG-1050-145-5002

QUALITY PLAN-SG,TG,BOP

760

EDN

C&I-BOP

BTG-BAU-DWG-E-0223

EN-DG-1050-145-5003

EARTHING SCHEME

761

EDN

C&I-BOP

BTG-XXX-DSH-E-0224

EN-DG-1050-145-5004

TEST PROTOCOL-SG,TG,BOP&HMI

762

EDN

C&I-BOP

BTG-XXX-DSH-E-0225

EN-DG-1050-145-5005

SYSTEM DESIGN PHILOSOPHY-SG,TG,BOP

763

EDN

C&I-BOP

BTG-XXX-DWG-E-0226

EN-DG-1050-145-5006

OGA OF SG/TG/BOP/HMI

764

EDN

C&I-BOP

BTG-XXX-MNL-E-0227

EN-DG-1050-145-5007

O&M MANUALS BOP PACKAGE

765

EDN

C&I-BOP

BTG-XXX-SCH-E-0228

EN-DG-1050-145-5008

CABLE SCHEDULE-BOP

766

EDN

C&I-BOP

BTG-CWA-DWG-I-0101

EN-DG-1050-145-5010

OGA OF UNIT CONTROL PANEL

767

EDN

C&I-BOP

BTG-XXX-DWG-E-0229

EN-DG-1050-145-5011

ELECTRICAL SCHEMATIC DIAGRAM OF UCP

768

EDN

C&I-BOP

BTG-XXX-DWG-I-0102

EN-DG-1050-145-5012

OGA OF ELECTRICAL CONTROL PANEL

769

EDN

C&I-BOP

BTG-XXX-DWG-I-0103

EN-DG-1050-145-5013

SCHEMATIC DIAGRAM OF ELECTRICAL


CONTROL PANEL

770

EDN

C&I-BOP

BTG-XXX-DWG-E-0230

EN-DG-1050-145-5014

SCHEMATIC DIAGRAM OF TRANSDUCER & AVT I


PANEL

771

EDN

C&I-BOP

BTG-XXX-MNL-E-0231

EN-DG-1050-145-5015

O &M MANUALS FOR ECP,UCP & T&AVT PANEL I

772

EDN

C&I-BOP PR
MECH

BTG-XXX-DWG-I-0104

EN-DG-1050-145-6001

INSTALLATION SCHEMES FOR INSTRUMENTS I

773

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0105

EN-DG-1050-145-6002

DATA SHEET & DRG FOR AIR FILTER


REGULATOR

774

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0106

EN-DG-1050-145-6003

DATA SHEET & DRG FOR E/P CONVERTER

108 OF 276

A
A
A

3 (iv)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

775

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0107

EN-DG-1050-145-6004

QUALITY CHECKLIST FOR E/P CONVERTER

776

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0108

EN-DG-1050-145-6005

DATA SHEET & DRG FOR LEVEL SWITCH

777

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-E-0232

EN-DG-1050-145-6006

QUALITY CHECKLIST FOR LEVEL SWITCH

778

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0109

EN-DG-1050-145-6007

DATA SHEET, DRG FOR TEMP. ELEMENTS


( T/C's & RTD's) with THERMOWELLS

779

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6008

QUALITY PLAN FOR TEMP ELEMENTS

780

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0110

EN-DG-1050-145-6009

DATA SHEET FOR PRESSURE GAUGES

781

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0111

EN-DG-1050-145-6010

QUALITY CHECK LIST FOR PRESSURE


GAUGES

782

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0112

EN-DG-1050-145-6011

DATA SHEET FOR TEMPERATURE GAUGES

783

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0113

EN-DG-1050-145-6012

QUALITY CHECK LIST FOR TEMPERATURE


GAUGES

784

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0114

EN-DG-1050-145-6013

DATA SHEET FOR PRESSURE SWITCHES

785

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-E-0233

EN-DG-1050-145-6014

QUALITY CHECK LIST FOR PRESSURE


SWITCHES

786

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0115

EN-DG-1050-145-6015

DATA SHEET FOR FLUE GAS ANALYSER


(SO2/NOx/CO2/CO )

787

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0116

EN-DG-1050-145-6016

DATA SHEET FOR OXYGEN ANALYSER

788

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0117

EN-DG-1050-145-6017

DATA SHEET FOR DUST (OPACITY) ANALYSER A

789

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0118

EN-DG-1050-145-6018

DATA SHEET/DRGS., BOM FOR STEAM AND


WATER SYSTEM ( SWAS )

790

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6019

QUALITY PLAN FOR SWAS SYSTEM

791

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0119

EN-DG-1050-145-6020

DATA SHEET,DRG, BOM FOR VIBRATION


MONITORING SYSTEM ( VMS )

792

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6021

QUALITY PLAN FOR VIBRATION MONITORING


SYSTEM

109 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)
A

Dept

793

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0120

EN-DG-1050-145-6022

DATA SHEET/DRG, BOM FOR COAL BUNKER


LEVEL MONITORING SYSTEM

794

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0155

EN-DG-1050-145-6023

QUALITY CHECK LIST FOR COAL BUNKER LVL A


MONITORING SYSTEM

795

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0156

EN-DG-1050-145-6024

BOQ FOR IMPULSE PIPES & SAMPLE PIPES

796

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0157

EN-DG-1050-145-6025

QUALITY CHECK LIST FOR IMPULSE PIPES

797

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0158

EN-DG-1050-145-6026

BOQ FOR CONDENSATE POTS

798

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0159

EN-DG-1050-145-6027

QUALITY CHECK LIST FOR CONDENSATE


POTS

799

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0160

EN-DG-1050-145-6028

BOQ FOR VALVE MANIFOLDS

800

EDN

C&I-BOP PR
MECH

BTG-XXX-LIST-I-0161

EN-DG-1050-145-6029

QUALITY CHECK LIST FOR VALVE MANIFOLDS A

801

EDN

C&I-BOP PR
MECH

BTG-XXX-DWG-I-0121

EN-DG-1050-145-6030

GA, LAYOUT & WIRING DRGS. FOR LOCAL


INSTRUMENT ENCLOSURES & RACKS( LIE /
LIR )

802

EDN

C&I-BOP PR
MECH

Err:512

EN-DG-1050-145-6031

QUALITY PLAN FOR LIE/LIR

803

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0162

EN-DG-1050-145-6032

BOQ FOR SOCKET WELD FITTING

804

EDN

C&I-BOP PR
MECH

BTG-XXX-DSH-I-0122

EN-DG-1050-145-6033

DATA SHEET/CATALOGUE FOR LABORATORY


INSTRUMENTS ( MECHANICAL)

805

EDN

C&I-BOP PR
MECH

BTG-XXX-MNL-M-0252

EN-DG-1050-145-6034

O&M MANUAL FOR BOUGHT OUT ITEMS


( MECHANICAL)

806

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0123

EN-DG-1050-145-7001

DATA SHEET ,DRAWING & BOM FOR MASTER


DIGITAL CLOCK SYSTEM

807

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7002

QUALITY PLAN FOR MASTER DIGITAL CLOCK


SYSTEM

808

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0124

EN-DG-1050-145-7003

DATA SHEET FOR ELECTRONIC PR & DIFF PR


TRANSMITTERS

809

EDN

C&I-BOP PR
ELECT

BTG-XXX-LIST-E-0234

EN-DG-1050-145-7004

QUALITY CHECKLIST FOR TRANSMITTERS

110 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

810

EDN

C&I-BOP PR
ELECT

BTG-AXC-LIST-E-0235

EN-DG-1050-145-7005

Feeder List, Load & Battery Sizing Calculation for


UPS System.

811

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7006

QUALITY PLAN FOR UPS SYSTEM

812

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0125

EN-DG-1050-145-7007

DATA SHEET & SIZING CALUCULATION FOR NI A


CD BATTERY OF UPS

813

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7008

QUALITY PLAN FOR BATTERY OF UPS

814

EDN

C&I-BOP PR
ELECT

BTG-BTQ-DSH-E-0236

EN-DG-1050-145-7009

DATA SHEET, DRG FOR 24V DC BATTERY


CHARGER SYSTEM & DCDB

815

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7010

QUALITY PLAN FOR 24V DV BATTERY


CHARGER SYTEM

816

EDN

C&I-BOP PR
ELECT

BTG-BT-DSH-E-0237

EN-DG-1050-145-7011

DATA SHEET & SIZING CALUCULATION FOR


CHARGER-BATTERY

817

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7012

QUALITY PLAN FOR BATTERY OF CHARGER

818

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0238

EN-DG-1050-145-7013

DATA SHEET,DRG FOR INSTRUMENATION


CABLE

819

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7014

QUALITY PLAN FOR INSTRUMENTAYTION


CABLE

820

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0239

EN-DG-1050-145-7015

DATA SHEET, DRG FOR COMPENSATING


( THERMO COUPLE) CABLE

821

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7016

QUALITY PLAN FOR COMPENSATING


( THERMO COUPLE) CABLE

822

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0240

EN-DG-1050-145-7017

DATA SHEET ,DRG FOR LT POWER CABLE

111 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

823

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7018

QUALITY PLAN FOR LT POWER CABLE

824

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0126

EN-DG-1050-145-7019

DATA SHEET FOR BAR GRAPH INDICATORS

825

EDN

C&I-BOP PR
ELECT

BTG-XXX-LIST-E-0241

EN-DG-1050-145-7020

QUALITY CHECK LIST FOR INDICATORS

826

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0127

EN-DG-1050-145-7021

DATA SHEET FOR HART MANAGEMENT


SYSTEM

827

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7022

QUALITY PLAN FOR HMS

828

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0128

EN-DG-1050-145-7023

DATA SHEET,DRG FOR JUNCTION BOX

829

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0129

EN-DG-1050-145-7024

DATA SHEET of UPS System

830

EDN

C&I-BOP PR
ELECT

BTG-BTQ-LIST-E-0242

EN-DG-1050-145-7025

Feeder List, Load & Battery sizing calculation for


24V DC Charger System.

831

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-E-0243

EN-DG-1050-145-7026

DATA SHEET/CATALOGUE FOR LAB


INSTRUMETNS ( ELECTRICAL)

832

EDN

C&I-BOP PR
ELECT

BTG-XXX-MNL-E-0244

EN-DG-1050-145-7027

O&M MANUAL FOR MAJOR BOUGHT OUT


ITEMS (ELECTRICAL)

833

EDN

C&I-BOP PR
ELECT

BTG-XXX-DSH-I-0130

EN-DG-1050-145-7027

DATA SHEET FOR TURBINE SUPERVISORY


INSTRUMENTATION

834

EDN

C&I-BOP PR
ELECT

Err:512

EN-DG-1050-145-7028

QUALITY PLAN FOR JUNTION BOX

835

EDN

PADO

BTG-KKS-DWG-I-0131

EN-DG-1050-145-8004

PADO - SYSTEM DESCRIPTION FOR SR


MODULE

836

BPL

MDL

Err:512

BHEL/BPL/CMG/IBV/001

MASTER DRAWING LIST-BPL

837

BPL

RE Joints

BTG-XXX-DWG-M-0253

BP-DG-391-133-0001

GA of RE Joint (PBT) -2500 NB

112 OF 276

I
A

1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

838
839

BPL
BPL

RE Joints
RE Joints

BTG-XXX-SPC-M-0254
BTG-XXX-DWG-M-0255

BP-DG-391-133-0002
BP-DG-391-133-0003

Painting Spec
GA of RE Joint for CW Pump (1800 NB)

840

BPL

RE Joints

BTG-XXX-DWG-M-0256

BP-DG-391-133-0004

GA of RE Joint for Raw Water Pump (600 NB)

841

BPL

RE Joints

BTG-XXX-DWG-M-0257

BP-DG-391-133-0005

GA of RE Joint for CW Makeup Pump (500 NB)

842

BPL

Flash Tank

BTG-XXX-DWG-M-0258

BP-DG-391-147-0001

Arrgt. of HP Drain Flash Tank

843

BPL

Flash Tank

BTG-XXX-DWG-M-0259

BP-DG-391-147-0002

Arrgt. of LP Drain Flash Tank

844

BPL

Flash Tank

BTG-XXX-DWG-M-0260

BP-DG-391-147-0003

Arrgt. of Steam Drain Flash Tank

845

BPL

Flash Tank

BTG-XXX-DWG-M-0261

BP-DG-391-147-0004

Arrgt. of Unit Flash Tank

846

BPL

Flash Tank

BTG-XXX-DWG-M-0262

BP-DG-391-147-0005

Arrgt. of FWHSVD Flash Tank

847

BPL

Misc. Tank

BTG-QSV-DWG-M-0263

BP-DG-391-167-0001

GA of Clean Oil Tank

848

BPL

Misc. Tank

BTG-QSV-DWG-M-0264

BP-DG-391-167-0002

GA of Dirty Oil Tank

849

BPL

Misc. Tank

BTG-XXX-DWG-M-0265

BP-DG-391-167-0003

Arrgt & Assy of Oil Unloading Vessel

850

BPL

Misc. Tank

BTG-XXX-DWG-M-0266

BP-DG-391-167-0004

GA of DMCW O/H Tank

851

BPL

Misc. Tank

BTG-XXX-DWG-M-0267

BP-DG-391-167-0005

Potable Water Tank

852

BPL

BF Valves

BTG-XXX-DWG-M-0268

BP-DG-391-165-0001

Arrgt. of 2500 Dia BFV with Elect. Actuator

853

BPL

BF Valves

BTG-XXX-DWG-M-0269

BP-DG-391-165-0002

Arrgt. of 800 Dia BFV with Elec. Actuator

854

BPL

BF Valves

BTG-XXX-MNL-M-0270

BP-DG-391-165-0003

Arrgt. of 800 Dia BFV with Manual Operator

855

BPL

BF Valves

BTG-XXX-DWG-M-0271

BP-DG-391-165-0004

Arrgt. of 450 Dia BFV with Elec. Actuator

856

BPL

BF Valves

BTG-XXX-MNL-M-0272

BP-DG-391-165-0005

Arrgt. of 450 Dia BFV with Manual Operator

857

BPL

BF Valves

BTG-XXX-DWG-M-0273

BP-DG-391-165-0006

Arrgt. of 400 Dia BFV With Elec. Actuator

858

BPL

BF Valves

BP-DG-391-165-0007

Arrgt. of 400 Dia BFV with Manual Operator

BTG-XXX-MNL-M-0284

113 OF 276

LNTP
Purpose reference
(I/ A)
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

859

BPL

FD Fan Motor

BTG-HLB-DWG-E-0245

BP-DG-391-106-0001

OGA

860

BPL

FD Fan Motor

BTG-HLB-DSH-E-0246

BP-DG-391-106-0002

Tech. Data Sheet

861

BPL

FD Fan Motor

BTG-HLB-DWG-E-0247

BP-DG-391-106-0003

PSTB for Direct Termination

862

BPL

FD Fan Motor

BTG-HLB-DWG-E-0248

BP-DG-391-106-0004

Neurtal Terminal Arrgt.

863

BPL

FD Fan Motor

BTG-HLB-DWG-E-0502

BP-DG-391-106-0005

Aux. TB for RTDS & BTDS

864

BPL

FD Fan Motor

BTG-HLB-DWG-E-0503

BP-DG-391-106-0006

Aux. TB for Space Heater

865

BPL

FD Fan Motor

BTG-HLB-DWG-E-0249

BP-DG-391-106-0007

CT Secondary Terminal Box Arrgt.

866

BPL

FD Fan Motor

CABLE DETAILS

867

BPL

FD Fan Motor

SPECIFICATION OF FD FAN MOTOR

868

BPL

PA Fan Motor

BTG-QHL-DWG-E-0250

BP-DG-391-109-0001

OGA

869

BPL

PA Fan Motor

BTG-QHL-DSH-E-0251

BP-DG-391-109-0002

Tech. Data Sheet

870

BPL

PA Fan Motor

BTG-QHL-DWG-E-0252

BP-DG-391-109-0003

Stator Terminal Box (PSTB)

871

BPL

PA Fan Motor

BTG-QHL-DWG-E-0253

BP-DG-391-109-0004

Neutral TB Arrgt.

872

BPL

PA Fan Motor

BTG-QHL-DWG-E-0254

BP-DG-391-109-0005

Aux. TB for RTDS & BTDS

873

BPL

PA Fan Motor

BTG-QHL-DWG-E-0504

BP-DG-391-109-0006

Aux. TB for Space Heater

874

BPL

PA Fan Motor

BTG-QHL-DWG-E-0255

BP-DG-391-109-0007

CT Secondary Terminal Box Arrgt.

875

BPL

PA Fan Motor

BP-DG-391-109-0008

Details of Anchoring arrangement

876

BPL

PA Fan Motor

CABLE DETAILS

877

BPL

PA Fan Motor

SPECIFICATIONOF AC/DC MOTOR

878

BPL

ID Fan Motor

BTG-HNC-DWG-E-0256

BP-DG-391-107-0001

114 OF 276

OGA

2X660 MW IB VALLEY TPS


LNTP
Purpose reference
(I/ A)
A
A
I
I
I
I
I
I
I
A
A
I
I
I
I
I
I
I
I
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Dept

2X660 MW IB VALLEY TPS


LNTP
Purpose reference
(I/ A)

879

BPL

ID Fan Motor

BTG-HNC-DSH-E-0257

BP-DG-391-107-0002

Tech. Data Sheet

880

BPL

ID Fan Motor

BTG-HNC-DWG-E-0258

BP-DG-391-107-0003

Main Termianl Box

881

BPL

ID Fan Motor

BTG-HNC-DWG-E-0259

BP-DG-391-107-0004

Aux. TB for RTDS & BTDS

882

BPL

ID Fan Motor

BTG-HNC-DWG-E-0260

BP-DG-391-107-0005

Aux. TB for Space Heater

883

BPL

ID Fan Motor

BTG-HNC-DWG-E-0261

BP-DG-391-107-0006

CT Secondary Terminal Box Arrgt.

884

BPL

ID Fan Motor

BTG-XXX-DWG-M-0285

BP-DG-391-107-0007

Anchoring Arrgt.

885

BPL

ID Fan Motor

BP-DG-391-107-0008

Neutral terminal box arrangement

886

BPL

ID Fan Motor

CABLE DETAILS

887

BPL

ID Fan Motor

SPECIFICATIONOF AC/DC MOTOR

888

BPL

CEP Motor

BTG-LCB-DWG-E-0262

BP-DG-391-143-0001

OGA

889

BPL

CEP Motor

BTG-LCB-DSH-E-0263

BP-DG-391-143-0002

Tech. Data Sheet

890

BPL

CEP Motor

BTG-LCB-DWG-E-0264

BP-DG-391-143-0003

PSTB for Direct Termination

891

BPL

CEP Motor

BTG-LCB-DWG-E-0265

BP-DG-391-143-0004

Aux. TB for RTDS & BTDS

892

BPL

CEP Motor

BTG-LCB-DWG-E-0266

BP-DG-391-143-0005

Aux. Terminal Box for Space Heater

893

BPL

CEP Motor

BTG-LCB-DWG-E-0267

BP-DG-391-143-0006

Neutral TB Arrgt.

894
895
896
897
898
899
900
901

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor
BFP Motor

BTG-LAC-DWG-E-0268
BTG-LAC-DSH-E-0269
BTG-LAC-DWG-E-0270
BTG-LAC-DWG-E-0271
BTG-LAC-DWG-E-0272
BTG-LAC-DWG-E-0273
BTG-LAC-DWG-E-0274
BTG-LAC-DWG-E-0275

BP-DG-391-139-0001
BP-DG-391-139-0002
BP-DG-391-139-0003
BP-DG-391-139-0004
BP-DG-391-139-0005
BP-DG-391-139-0006
BP-DG-391-139-0007
BP-DG-391-139-0008

OGA
Tech. Data Sheet
Stator Terminal Box (PSTB)
Neutral Terminal Arrgt.
Aux. Terminal Box for Space Heater
Aux. Terminal Box (RTD & BTD)
Secondary TB
Aux. Terminal Box for hot & cold air duct

A
A
I
I
I
I
I
I

902
903

BPL
BPL

Mill Motor
Mill Motor

BTG-HFC-DWG-E-0275
BTG-HFC-DSH-E-0276

BP-DG-391-213-0001
BP-DG-391-213-0002

OGA
Tech. Data Sheet

A
A

115 OF 276

A
I
I
I
I
I

I
I
A
A
I
I
I
I

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

904
905
906
907
908
909
910
911

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
Mill Motor
DMCW-SG
Motor

BTG-HFC-DWG-E-0277
BTG-HFC-DWG-E-0278
BTG-HFC-DWG-E-0279
BTG-HFC-DWG-E-0280
BTG-XXX-DWG-S-0068
BTG-HFC-DWG-E-0281
BTG-HFC-DWG-E-0282
BTG-PGC-DWG-E-0282

BP-DG-391-213-0003
BP-DG-391-213-0004
BP-DG-391-213-0005
BP-DG-391-213-0006
BP-DG-391-213-0007
BP-DG-391-213-0008
BP-DG-391-213-0009
BP-DG-391-152-0001

PSTB for Direct Termination


Neutral Terminal Arrgt.
Aux. TB for RTDS & BTDS
Aux. Terminal Box for Space Heater
Foundation Arrgt.
Non Contact Type Speed Switch
Aux. Terminal Box for Space Heater
OGA

I
I
I
I
I
I
I
A

912

BPL

DMCW-SG
Motor

BTG-PGC-DSH-E-0283

BP-DG-391-152-0002

Tech. Data Sheet

913

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0284

BP-DG-391-152-0003

PSTB for Direct Termination

914

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0285

BP-DG-391-152-0004

Aux. Terminal Box (RTD & BTD)

915

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0286

BP-DG-391-152-0005

Aux. Terminal Box for Space Heater

916

BPL

DMCW-SG
Motor

BTG-PGC-DWG-E-0287

BP-DG-391-152-0006

Neutral Terminal Arrgt.

917

BPL

DMCW-SG
Motor

BTG-XXX-DWG-S-0069

BP-DG-391-152-0007

Foundation Arrgt.

918

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0288

BP-DG-391-152-0011

OGA

919

BPL

DMCW-TG
Motor

BTG-PGC-DSH-E-0289

BP-DG-391-152-0012

Tech. Data Sheet

920

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0290

BP-DG-391-152-0013

PSTB for Direct Termination

921

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0291

BP-DG-391-152-0014

Aux. Terminal Box (RTD & BTD)

922

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0292

BP-DG-391-152-0015

Aux. Terminal Box for Space Heater

923

BPL

DMCW-TG
Motor

BTG-PGC-DWG-E-0293

BP-DG-391-152-0016

Neutral Terminal Arrgt.

924

BPL

DMCW-TG
Motor

BTG-XXX-DWG-S-0070

BP-DG-391-152-0018

Foundation Arrgt.

925

BPL

ACW Motor

BTG-PCB-DWG-E-0294

BP-DG-391-154-0001

OGA

926

BPL

ACW Motor

BTG-PCB-DSH-E-0295

BP-DG-391-154-0002

Tech. Data Sheet

927

BPL

ACW Motor

BTG-PCB-DWG-E-0296

BP-DG-391-154-0003

PSTB for Direct Termination

116 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

928

BPL

ACW Motor

BTG-PCB-DWG-E-0297

BP-DG-391-154-0004

Aux. Terminal Box (RTD & BTD)

929

BPL

ACW Motor

BTG-PCB-DWG-E-0298

BP-DG-391-154-0005

Aux. Terminal Box for Space Heater

930

BPL

ACW Motor

BTG-PCB-DWG-E-0299

BP-DG-391-154-0006

Neutral Terminal Arrgt.

931

BPL

ACW Motor

BTG-XXX-DWG-S-0071

BP-DG-391-154-0007

Foundation Arrgt.

932
933
934
935
936
937
938
939
940
941
942
943
944
945
946

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT
GT

BTG-BAT-DWG-E-0300
BTG-BAT-LIST-E-0301
BTG-XXX-DWG-S-0072
BTG-BAT-DWG-E-0302
BTG-BAT-DWG-E-0303
BTG-BAT-DWG-E-0304
BTG-XXX-DWG-M-0290
BTG-BAT-DWG-E-0305
BTG-XXX-DWG-I-0132
BTG-XXX-DWG-M-0291
BTG-XXX-SCH-M-0286
BTG-XXX-DWG-M-0287
BTG-XXX-DWG-M-0288
BTG-BAT-DSH-E-0306
Err:512

BP-DG-391-301-0001
BP-DG-391-301-0002
BP-DG-391-301-0003
BP-DG-391-301-0004
BP-DG-391-301-0005
BP-DG-391-301-0006
BP-DG-391-301-0007
BP-DG-391-301-0008
BP-DG-391-301-0009
BP-DG-391-301-0010
BP-DG-391-301-0011
BP-DG-391-301-0012
BP-DG-391-301-0013
BP-DG-391-301-0014
BP-DG-391-301-0015

OGA
OGA Part List
Foundation Plan
HV Bushing
LV Bushing
Neutral Bushing
Bi-Direction Roller
LV Bus duct mounting
Loading gauge diagram
Rating & Diagram Plate
Valve schedule Plate
GA of Cooler Control Cabinet
Cooler control scheme
Data Sheet
Customers Inspection Test Schedule

A
A
A
I
I
I
I
A
I
A
I
A
A
A
A

947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

GT
GT
GT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT
RAT

BTG-XXX-DWG-M-0289
Err:512
Err:512
BTG-AXT-DWG-E-0307
BTG-AXT-LIST-E-0308
BTG-XXX-DWG-S-0073
BTG-AXT-DWG-E-0309
BTG-AXT-DWG-E-0310
BTG-AXT-DWG-E-0311
BTG-XXX-DWG-M-0290
BTG-AXT-DWG-E-0312
BTG-XXX-DWG-I-0133
BTG-XXX-DWG-M-0291
BTG-XXX-DWG-M-0292
BTG-XXX-DWG-M-0293
BTG-XXX-DWG-M-0294
BTG-AXT-DSH-E-0313

BP-DG-391-301-0016
BP-DG-391-301-0017
BP-DG-391-301-0018
BP-DG-391-302-0001
BP-DG-391-302-0002
BP-DG-391-302-0003
BP-DG-391-302-0004
BP-DG-391-302-0005
BP-DG-391-302-0006
BP-DG-391-302-0007
BP-DG-391-302-0008
BP-DG-391-302-0009
BP-DG-391-302-0010
BP-DG-391-302-0011
BP-DG-391-302-0012
BP-DG-391-302-0013
BP-DG-391-302-0014

Over Fluxing withstand curve


Diagram of Common Kiosk
GA of Common Kiosk
OGA
OGA Part List
Foundation Plan
HV Bushing
LV Bushing
Neutral Bushing
Bi-Direction Roller
Bus duct mounting Flange
Loading gauge diagram
Rating & Diagram Plate
Valve schedule Plate
GA of Cooler Control Cabinet
Cooler control scheme
Data Sheet

I
A
A

117 OF 276

A
A
A
I
I
I
I
A
I
A
I
A
A
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group
RAT

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

Err:512

BP-DG-391-302-0015

Customers Inspection Test Schedule

BP-DG-391-302-0016

Schematic diagram of independent tap changer


control

Dept

LNTP
Purpose reference
(I/ A)

964

BPL

965

BPL

966

BPL

Switchgear

BTG-XXX-DWG-E-0511

BP-DG-391-505-0001

Layout & Floor Plan - Unit SW BD -1

967

BPL

Switchgear

BTG-XXX-DWG-E-0512

BP-DG-391-505-0002

Layout & Floor Plan - Unit SW BD -2

968

BPL

Switchgear

BTG-XXX-DWG-E-0513

BP-DG-391-505-0003

Layout & Floor Plan - Unit SW BD -3

969

BPL

Switchgear

BTG-XXX-DWG-E-0514

BP-DG-391-505-0004

Layout & Floor Plan - Unit SW BD -4

970

BPL

Switchgear

BTG-XXX-DWG-E-0515

BP-DG-391-505-0005

Layout & Floor Plan - Station SW BD -1

971

BPL

Switchgear

BTG-XXX-DWG-E-0516

BP-DG-391-505-0006

Layout & Floor Plan - Station SW BD -2

972

BPL

Switchgear

BTG-XXX-DWG-E-0517

BP-DG-391-505-0007

Layout & Floor Plan - Station SW BD -3

973

BPL

Switchgear

BTG-XXX-DWG-E-0518

BP-DG-391-505-0008

Layout & Floor Plan - Station SW BD -4

974

BPL

Switchgear

BTG-BHA-DWG-E-0314

BP-DG-391-505-0009

Layout Bus Transfer Panel

975

BPL

Switchgear

BTG-BHA-DWG-E-0315

BP-DG-391-505-0010

Schematic Diagram Bus Transfer

976

BPL

Switchgear

BTG-BHA-DWG-E-0316

BP-DG-391-505-0011

Schematic Diagram Motor feeder

977

BPL

Switchgear

BTG-BHA-DWG-E-0317

BP-DG-391-505-0012

Schematic Diagram Motor feeder

978

BPL

Switchgear

BTG-BHA-DWG-E-0318

BP-DG-391-505-0013

Schematic Diagram Transformer. Feeder

979

BPL

Switchgear

BTG-BHA-DWG-E-0319

BP-DG-391-505-0014

Schematic Diagram Outgoing feeder

980

BPL

Switchgear

BTG-BHA-DWG-E-0320

BP-DG-391-505-0015

Schematic Diagram Incomer

981

BPL

Switchgear

BTG-BHA-DWG-E-0321

BP-DG-391-505-0016

Schematic Diagram Tie feeder

982

BPL

Switchgear

BTG-BHA-DWG-E-0322

BP-DG-391-505-0017

Schematic Diagram Bus PT

983

BPL

Switchgear

BTG-BHA-DWG-E-0323

BP-DG-391-505-0018

Schematic Diagram Feeder PT

118 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

984

BPL

Switchgear

BTG-BHA-DWG-E-0324

BP-DG-391-505-0019

Key Diagram for Unit SWBD-1

985

BPL

Switchgear

BTG-BHA-DWG-E-0325

BP-DG-391-505-0020

Key Diagram for Unit SWBD-2

986

BPL

Switchgear

BTG-BHA-DWG-E-0326

BP-DG-391-505-0021

Key Diagram for Unit SWBD-3

987

BPL

Switchgear

BTG-BHA-DWG-E-0327

BP-DG-391-505-0022

Key Diagram for Unit SWBD-4

988

BPL

Switchgear

BTG-BHA-DWG-E-0328

BP-DG-391-505-0023

Key Diagram for Stn. SWBD-1

989

BPL

Switchgear

BTG-BHA-DWG-E-0329

BP-DG-391-505-0024

Key Diagram for Stn. SWBD-2

990

BPL

Switchgear

BTG-BHA-DWG-E-0330

BP-DG-391-505-0025

Key Diagram for Stn. SWBD-3

991

BPL

Switchgear

BTG-BHA-DWG-E-0331

BP-DG-391-505-0026

Key Diagram for Stn. SWBD-4

992

BPL

GRP

BTG-MKY-DWG-E-0332

BP-DG-391-305-0001

OGA Drawing of Generator, GT and UAT Protection A


Panel

993

BPL

GRP

BTG-MKY-DWG-E-0333

BP-DG-391-305-0002

Schematic Drawing of Generator, GT and UAT


Protection Panel

994

BPL

QAP

BTG-BAT-DWG-E-0334

QA/TCB/31/763

270MVA, 21/420KV 1 Ph- Generator Transformer

995

BPL

QAP

BTG-AXT-DWG-E-0335

QA/TCB/31/764

50MVA, 400/11.5KV 3 Ph. Reserve Auxiliary


Transformer

996
997
998
999
1000
1001
1002
1003
1004
1005
1006

BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL
BPL

QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
QAP
Vendor List

BTG-XXX-QAP-M-0295
BTG-XXX-QAP-M-0296
BTG-XXX-QAP-M-0297
BTG-XXX-QAP-M-0298
BTG-XXX-QAP-M-0299
BTG-XXX-QAP-M-0300
BTG-XXX-QAP-E-0336
BTG-XXX-QAP-E-0337
BTG-XXX-QAP-E-0338
BTG-XXX-QAP-M-0301
BTG-BAT-LIST-E-0339

QA-G/TH/1174
QA-G/TH/1175
QA-G/TH/1176
QA-G/TH/1177
QA-G/TH/1178
QA-G/TH/1179
QA/MT/IMM-803
QA/MT/LEM-803
QAQC/SCR/15/780
QAQC/SCR/15/781
QA/TCB/24/563

QA Plan for BF Valve (Cast)


QA Plan for BF Valve (Fab.)
QA Plan for Flash Tanks
QA Plan for Misc. Tanks
QA Plan for RE Joints (PBT)
QA Plan for RE Joints (Conv.)
QA Plan for Medium Range Motors
QA Plan for Large Range Motors
QA Plan for Indoor Switchgear
QA Plan for Gen. Prot. Relay Panel
Vendor List of Generator Transformer

1007

BPL

Vendor List

BTG-AXT-LIST-E-0340

QA/TCB/24/564

Vendor List of Reserve Aux. Transformer

1008

BPL

Vendor List

BTG-XXX-LIST-E-0341

QA/MT/VL-11-12

Vendor List for HT Motors

119 OF 276

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1009

BPL

Vendor List

BTG-XXX-LIST-M-0302

VENDOR LIST

Vendor List for RE Joins, Flash Tanks, Misc. Tanks,


BF Valves

1010

BPL

Vendor List

BTG-XXX-LIST-E-0342

SWE/GRP/93023/VL

Vendor List for Gen. Prot. Relay Panel

1011

BPL

Vendor List

BTG-XXX-LIST-E-0343

BHEL/SWGR/VL/OPGCL/MH

Vendor List for Switchgears

1012

BPL

PA Fan Motor

BP-DG-391-109-0008

Anchoring Arrgt.

1013

BPL

ID Fan Motor

BTG-XXX-DWG-M-0304

BP-DG-391-107-0008

Neutral Terminal Box Arrgt.

1014

BPL

RAT

BTG-XXX-DWG-M-0305

BP-DG-391-302-0016

Schematic Diagram for Independent TAP Changer


Control

1015
1016

RUD
RUD

MDL
ENG

Err:512
BTG-XXX-DWG-E-0344

RU-MDL-001
0 19 91 31 1001

MASTER DRAWING LIST-RUD


LAYOUT OF ISOLATED PHASE BUSDUCT

1017

RUD

ENG

BTG-UMC-DWG-S-0074

0 19 91 31 1002

FOUNDATION PLAN OF IP BUSDUCT

1018
1019

RUD
RUD

ENG
ENG

BTG-XXX-DWG-M-0306
BTG-XXX-DWG-E-0345

2 99 13 31 1003
2 99 13 31 1004

OGA OF SPVT CUBICLE


WIRING DIAGRAM OF SPVT CUBICLE

A
A

1020
1021
1022

RUD
RUD
RUD

ENG
ENG
ENG

BTG-XXX-DWG-E-0346
BTG-XXX-DWG-E-0347
BTG-BCA-DWG-E-0348

2 99 13 31 1005
2 99 13 31 1006
0 99 13 11 0001

OGA OF NG CUBICLE
WIRING DIGRAM OF NG CUBICLE
LAYOUT OF SEGREGATED PHASE BUSDUCT

A
A

1023

RUD

ENG

BTG-UMC-DWG-S-0075

0 99 13 11 0002

FOUNDATION PLAN OF SP BUSDUCT

1024
1025

RUD
RUD

ENG
ENG

Err:512
BTG-BCA-DWG-E-0349

2 99 13 31 1001
2 99 13 31 1002

SINGLE LINE DIAGRAM


WIRING DIAGRAM OF BUSDUCT CT's

1026

RUD

ENG

BTG-MKA-DSH-E-0350

TDS/IPB/12-099-C-1

TECHNICAL DATA SHEET OF IP BUSDUCT

1027

RUD

ENG

BTG-BCA-DSH-E-0351

TDS/SPB/12-099-C-2

TECHNICAL DATA SHEET OF SP BUSDUCT

1028

RUD

ENG

BTG-XXX-DWG-M-0307

2 99 13 31 1007

OGA OF HOT AIR BLOWING EQUIPMENT

1029

RUD

ENG

BTG-XXX-DWG-M-0308

2 99 13 31 1008

SCHEMATIC DIAGRAM OF HOT AIR BLOWING


EQUIPMENT

1030

RUD

ENG

BTG-XXX-LIST-E-0352

2 99 13 31 1008

STANDARD LIST OF SUB-VENDOR FOR


BUSDUCT

1031
1032

RUD
RUD

QAP
ENG

BTG-MKA-DWG-E-0353
BTG-MKA-DWG-E-0354

QAP/BD/12-099-C-1
2 99 13 31 1009

MQP for SPBD & IPBD


OGA OF LAVT CUBICLE

A
A

BTG-XXX-DWG-M-0303

120 OF 276

A
A
A
I
I
A
A
A
A

A
A
A
A
A
A
I
I

1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)
A

Dept

1033
1034

RUD
HYD

ENG
MDL

BTG-MKA-DWG-E-0355
Err:512

2 99 13 31 1010
HYDDL001

WIRING DIAGRAM OF LAVT CUBICLE


MASTER DRAWING LIST-HYD

1035
1036

HYD
HYD

MECH
MECH

BTG-XXX-DWG-M-0309
BTG-XXX-PCD-M-0310

HY-DG-391-139-0102
HY-DG-391-139-0102W

STEAM AND DRAIN SCHEME


WRITE UP ON STEAM AND DRAIN SCHEME

1037
1038

HYD
HYD

MECH
MECH

BTG-QSV-DWG-M-0311
BTG-QSV-PCD-M-0312

HY-DG-391-139-0101
HY-DG-391-139-0101W

LUBE OIL SCHEME


WRITE UP ON LUBE OIL SCHEME

1039
1040

HYD
HYD

MECH
MECH

BTG-XXX-DWG-M-0313
BTG-XXX-PCD-M-0314

HY-DG-391-139-0103
HY-DG-391-139-0103W

JACKING OIL P&I DIAGRAM


WRITE UP ON JACKING OIL P&I DIAGRAM

1041

HYD

MECH

BTG-QSV-DWG-M-0315

HY-DG-391-139-0150

SCHEMATIC FOR DRAINING AND


AND MAKE UP LUBE OIL RESERVOIRS OF
BFPDT

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

A
I
I
I
I

1042
1043
1044
1045
1046

HYD
HYD
HYD
HYD
HYD

MECH
MECH
MECH
MECH
MECH

BTG-XXX-DWG-M-0316
BTG-XXX-DWG-M-0317
BTG-XXX-DSH-M-0318
BTG-UMA-DWG-S-0076
BTG-LBA-DWG-M-0319

HY-DG-391-139-0107
HY-DG-391-139-0104
HY-DG-391-139-0105
HY-DG-391-139-0111
HY-DG-391-139-0114

LEGEND FOR SCHEME


GOVERNING SCHEME
WRITEUP ON GOVERNING SYSTEM.
FOUNDATION ARRANGEMENT
PIPING LAYOUT (STEAM)

1047

HYD

MECH

BTG-QSV-DWG-M-0320

HY-DG-391-139-0115

PIPING LAYOUT (LUBE OIL &CW)

1048

HYD

MECH

BTG-QSV-DSH-E-0354

HY-DG-391-139-0134

GA,DATA SHEETS & CHARACTERISTIC CURVE A


FOR LOP

1049

HYD

MECH

BTG-XXX-DSH-E-0355

HY-DG-391-139-0135

GA,DATA SHEETS &CHARACTERISTIC CURVE


FOR EOP

1050

HYD

MECH

BTG-XXX-DSH-E-0356

HY-DG-391-139-0136

GA,DATA SHEETS &CHARACTERISTIC CURVE


FOR JOP

1051

HYD

MECH

BTG-XXX-DWG-M-0321

HY-DG-391-139-0154B

FLOW DIAGRAM OF OIL PURIFIER

1052

HYD

MECH

BTG-XXX-DWG-M-0322

HY-DG-391-139-0154A

GA DRG OF OIL PURIFIER

121 OF 276

1 (i)

4 (i)
4 (i)
4 (i)
3 (vi)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)
I

Dept

1053

HYD

MECH

BTG-XXX-DWG-E-0357

HY-DG-391-139-0154C

ELECTRICAL WIRING DIAGRAM OF OIL


PURIFIER

1054

HYD

I&C

BTG-XXX-DWG-I-0134

HY-DG-391-139-0106

TURBINE SUPERVISORY INSTRUMENTATION


SCHEME

1055
1056

HYD
HYD

I&C
I&C

BTG-XXX-SCH-I-0135
BTG-XXX-DWG-I-0136

HY-DG-391-139-0118
HY-DG-391-139-0119

INSTRUMENT SCHEDULE
ATRS LOGIC DIAGRAM(SGC BFPDT TURBINE
SYSTEM)

1057

HYD

I&C

BTG-XXX-PCD-I-0137

HY-DG-391-139-0116

WRITE UP ON ATRS (SGC BFPDT TURBINE


SYSTEM )

1058

HYD

I&C

BTG-XXX-DWG-I-0138

HY-DG-391-139-0120

ATRS LOGIC DIAGRAM (SGC BFPDT OIL


SYSTEM )

1059

HYD

I&C

BTG-XXX-PCD-I-0139

HY-DG-391-139-0130

WRITE UP ON ATRS(SGC BFPDT OIL


SYSTEM )

1060
1061
1062

HYD
HYD
HYD

I&C
I&C
I&C

BTG-LAC-DWG-I-0140
BTG-XXX-PCD-E-0358
BTG-XXX-DWG-E-0359

HY-DG-391-139-0123
HY-DG-391-139-0157
HY-DG-391-139-0121

EHTC BLOCK DIAGRAM FOR BFPDT


WRITE UP ON EHTC
TSI LOOP DIAGRAM

1063
1064

HYD
HYD

I&C
MECH

BTG-XXX-DWG-M-0333
BTG-XXX-DSH-M-0334

HY-DG-391-139-0165
HY-DG-391-139-0122

CLOSED LOOP DRAWINGS


CONTROL VALVE DATA SHEET

1065

HYD

MECH

BTG-XXX-DSH-M-0335

HY-DG-391-139-0166

SAFETY VALVE DATA SHEET

1066

HYD

MECH

BTG-HFC-DWG-M-0336

0-00-620-85893

GA DRAWING OF HP 1103 MILL.

1067

HYD

MECH

BTG-UMC-DWG-S-0077

0-00-610-85894

FOUNDATION PLAN OF HP 1103 MILL

1068
1069

HYD
HYD

MECH
MECH

BTG-QSV-DWG-M-0337
BTG-HFC-DWG-M-0338

1-61-190-85977
1-61-811-01850

LUBE OIL SYSTEM SCHEME


MILL HANDLING ARRANGEMENT

1070

HYD

MECH

BTG-XXX-DSH-M-0339

1-61-190-85977D

OPERATING PROCEDURE-LUBE OIL SYSTEM

1071

HYD

P&ID

BA-PS-OPGCL-00

PAINTING SCHEDULE

1072

HYD

MECH

BTG-AXT-DSH-E-0313

BA-DS-OPGCL

DATA SHEET

1073

HYD

MECH

Err:512

QA DEPTT.

QUALITY PLAN

BTG-XXX-SCH-M-0340

122 OF 276

I
I

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

A
I

4 (i)
4 (i)

4 (i)

A
A
A
A
A

2 (vii)
3 (v)
4 (iii)
4 (ii)
4 (iii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

LNTP
Purpose reference
(I/ A)

Dept

1074

HYD

MECH

BTG-XXX-LIST-M-0341

BA-VL-HP1103

VENDOR LIST

1075

HYD

MECH

BTG-XXX-LIST-M-0342

BA-PGMA-WT-OPGCL

PGMA LIST WITH WEIGHTS

1076

HYD

MECH

Err:512

BA-BOI-HP1103-OPGCL

LIST OF BOIs

1077

HYD

MECH

BTG-HFC-DWG-M-0343

MHS-OPGCL-HP1103

MILL HANDLING ARRANGEMENT FOR


COMPONENTS HANDLING FOR
MAINTENANCE.

1078

HYD

MECH

BTG-UMC-DWG-S-0078

HY-DG-11800057611

FOUNDATION ARRANGEMENT OF MDBFP SET

1079

HYD

MECH

BTG-LAC-DWG-M-0344

HY-DG-11800057612

GENERAL ARRANGEMENT OF TDBFP SET

1080

HYD

MECH

BTG-LAC-DWG-M-0345

HY-DG-11800057613

GENERAL ARRANGEMENT OF MDBFP SET

1081
1082
1083
1084
1085
1086

HYD
HYD
HYD
HYD
HYD
HYD

MECH
MECH
MECH
MECH
I&C
I&C

BTG-LAC-DWG-M-0346
BTG-LAC-DWG-M-0347
BTG-LAC-DWG-M-0348
BTG-LAC-DWG-M-0349
BTG-LAC-DWG-M-0452
BTG-LAC-DWG-M-0453

HY-DG-11800057614
HY-DG-11800057615
HY-DG-11890057099
HY-DG-11890057100
HY-DG-11800057616
HY-DG-11800057617

SECTIONAL ASSEMBLY OF MDBFP


SECTIONAL ASSEMBLY OF TDBFP
SECTIONAL ASSEMBLY OF MD BP
SECTIONAL ASSEMBLY OF TD BP
PID FEED WATER OF MDBFP
PID SEALING & COOLING SYSTEM WATER OF
MDBFP

1087

HYD

I&C

BTG-LAC-DWG-M-0454

HY-DG-11800057618

PID LUB & WORKING OIL SYSTEM OF MDBFP

1088

HYD

I&C

BTG-LAC-DWG-M-0455

HY-DG-11800057619

PID LUB OIL SYSTEM OF TDBFP SET

1089

HYD

I&C

BTG-LAC-DWG-M-0456

HY-DG-11800057620

PID FEED WATER SYSTEM FOR TDBFP

1090

HYD

I&C

BTG-LAC-DWG-M-0457

HY-DG-11800057621

PID SEALING & COOLING WATER SYSTEM FOR


TDBFP

1091

HYD

MECH

BTG-UMC-DWG-S-0079

HY-DG-11800057622

GA & FOUNDATION OF MDBFP HC COOLERS

1092

HYD

MECH

BTG-LAC-DWG-M-0350

HY-DG-31800055679

MD BFP ESTIMATED PERFORMANCE CURVE

1093

HYD

MECH

BTG-LAC-DWG-M-0351

HY-DG-31890055586

MD BP ESTIMATED PERFORMANCE CURVE

1094

HYD

MECH

BTG-LAC-DWG-M-0352

HY-DG-31800055680

TD BFP ESTIMATED PERFORMANCE CURVE

1095

HYD

MECH

BTG-LAC-DWG-M-0353

HY-DG-31890055587

TD BP ESTIMATED PERFORMANCE CURVE

1096

HYD

I&C

Err:512

HY-DG-41800059734

INST.SCHEDULE OF MDBFP SET

123 OF 276

4 (ii)
I
I
A
A
I
I
I
A
A
A
A
A
A
A
I
I
I
I
I
A

3 (v)
3 (v)
3 (v)
4 (ii)
4 (ii)
4 (ii)
4 (ii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (ii)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)
A

1097
1098

HYD
HYD

I&C
MECH

BTG-LAC-SCH-I-0142
BTG-XXX-DWG-M-0354

HY-DG-41800059735
HY-DG-41800059736

INST. SCHEDULE OF TDBFP SET


OUTLINE DIM OF MDBFP & TDBFP RC VALVE
(FOR LAYOUT PURPOSE)

1099

HYD

MECH

BTG-XXX-DWG-M-0355

HY-DG-41890059648

GA OF SUCTION STRAINER MD & TD BOOSTER


PUMP (BASKET TYPE-FOR LAYOUT PURPOSE )

GA SUCTION STRAINER MD & TD BFP


(CONICAL TYPE-FOR LAYOUT PURPOSE)

1100

HYD

MECH

BTG-XXX-DWG-M-0356

HY-DG-41800059737

4 (ii)

4 (ii)

1101
1102

HYD
HYD

MECH
MECH

BTG-XXX-LIST-M-0357
BTG-XXX-SCH-E-0361

HY-DG-41800059738
HY-DG-41800059739

LUBE OIL REQUIREMENT LIST BFP


SCHEDULE OF MOTORS FOR PUMPS

1103

HYD

MECH

BTG-XXX-SCH-M-0358

HY-DG-41800059740

SCHEDULE OF SOLENIOD VALVES FOR BFP &


CEP

1104

HYD

MECH

BTG-XXX-SCH-I-0143

HY-DG-41800059741

SCHEDULE OF ACTUATORS FOR BFP & CEP

1105

HYD

I&C

BTG-LA-DSH-M-0359

HY-DG-41800059742

RECOMMENDED ANNUNCIATION & TRIPS FOR


MDBFP

1106

HYD

I&C

BTG-LA-PCD-M-0360

HY-DG-41800059743

INTERLOCKS &PROTECTIONS WRITE UP FOR


MDBFP

1107
1108

HYD
HYD

MECH
INTERNAL
TEST

BTG-XXX-DSH-M-0361
BTG-XXX-DSH-M-0362

HY-DG-41800059744
Testing Dept

TECH. DATA SHEET BFP PACKAGE


SHOP TEST PROCEDURE MDBFP & TDBFP

1109

HYD

INTERNAL
TEST

BTG-XXX-DSH-M-0363

Testing Dept

SHOP TEST PROCEDURE MDBP & TDBP

1110

HYD

MECH

BTG-XXX-DWG-E-0519

HY-DG-11810057220

GEN. ARRANGEMENT CEP AND MOTORS WITH


FOUNDATION DATA INCLUDING ALLOWABLE
FORCES, MOMENT OF NOZZLE

I
I
I

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
6 (v)

3 (v)
I

1111

HYD

MECH

BTG-LCB-DWG-M-0364

HY-DG-31810055587

CEP ESTIMATED PERFORMANCE CURVES

1112

HYD

I&C

BTG-LCB-DWG-M-0365

HY-DG-21810057021

SCHEMATIC DIAGRAM - SEALING AND


COOLING FOR CEP

1113

HYD

I&C

BTG-LCB-DWG-I-0144

HY-DG-21810057022

INSTRUMENTATION SCHEME FOR CEP

1114
1115

HYD
HYD

I&C
I&C

BTG-LCB-SCH-I-0145
BTG-LCB-PCD-M-0366

HY-DG-41810059666
HY-DG-41810059667

INSTRUMENT SCHEDULE FOR CEP


PROTECTIONS WRITE UP FOR CEP

1116
1117

HYD
HYD

MECH
MECH

BTG-LCB-DSH-M-0367
BTG-LCB-DSH-M-0368

HY-DG-41810059668
HY-DG-11810057221

TECH. DATA SHEET CEP PACKAGE


CROSS SECTIONAL ASSEMBLY CEP

124 OF 276

4 (i)
4 (ii)

I
I
A

4 (i)
4 (i)
4 (i)
4 (i)
4 (i)
6 (v)
4 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)
I

1118
1119

HYD
HYD

I&C
MECH

BTG-CBA-LIST-E-0362
BTG-XXX-DWG-M-0369

HY-DG-41810059669
HY-DG-41810059670

LIST OF INPUTS TO DDCMIS


GA SUCTION STRAINER OF CEP(FOR LAYOUT
PURPOSE)

1120

HYD

INTERNAL
TEST

BTG-XXX-DSH-M-0370

Testing Dept

SHOP PERFORMANCE TEST PROCEDUCER


CEP

1121

HYD

MECH

BTG-UMC-DWG-S-0080

HY-DG-391-139-0112

AUXILIARY EQUIPMENT FOUNDATION

1122

HYD

MECH

BTG-XXX-DWG-M-0371

HY-DG-391-139-0125

ALLOWABLE FORCES & MOMENTS ON


TURBINE FLANGES

1123

HYD

MECH

BTG-LAC-DWG-M-0372

HY-DG-391-139-0126

STEAM CONSUMPTION CURVE (FOR BFP


DRIVE TURBINE)

1124

HYD

MECH

BTG-LAC-DWG-M-0373

HY-DG-391-139-0128

START UP CURVES (FOR BFP DRIVE TURBINE) I

1125

HYD

Mech

BTG-LAC-DWG-M-0374

HY-DG-31890055588

ALLOWABLE FORCES, MOMENTS & THERMAL


MOVEMENTS OF BOOSTER PUMPS

ALLOWABLE FORCES, MOMENTS & THERMAL


MOVEMENTS OF MDBFP & TDBFP

1126

HYD

Mech

BTG-LAC-DWG-M-0375

HY-DG-31800055682

6 (v)

6 (v)

1127

HYD

Mech

BTG-XXX-DWG-M-0376

VENDOR DRG NO

SECTIONAL DRAWING OF HYDRAULIC


COUPLING

1128

HYD

Mech

BTG-XXX-DWG-M-0377

VENDOR DRG NO

WORKING OIL COOLER OF HYDRAULIC


COUPLING

1129

HYD

Mech

BTG-XXX-DWG-M-0378

VENDOR DRG NO

LUBE OIL COOLER OF HYDRAULIC COUPLING

1130

HYD

Mech

BTG-XXX-LIST-M-0379

HY-DG-31800055683

LIST SPECIAL TOOLS & TACKLES FOR BFP,


CEP

1131

HYD

I&C

BTG-XXX-LIST-M-0380

HY-DG-41800059746

LIST OF INPUTS TO DDCMIS MDBFP

1132

HYD

Mech

BTG-XXX-DWG-M-0381

HY-DG-41800059747

DESIGN CHARACTERISTIC CURVE MDBFP


SET(FLOW VS. HEAD AT DIFF SPEEDS)

DESIGN CHARACTERISTIC CURVE TDBFP SET


(FLOW VS. HEAD AT DIFF SPEEDS)

ESTIMATED CURVE OF BP SET NPSHR (0%,


1%, 3% & 40000 HRS)

1133

1134

HYD

HYD

Mech

Mech

BTG-XXX-DWG-M-0382

BTG-XXX-DWG-M-0383

HY-DG-41800059748

HY-DG-41890059650

125 OF 276

4 (i)
4 (ii)

4 (ii)
4 (ii)
4 (ii)

I
I

4 (i)
4 (i)

4 (i)

4 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1135

HYD

Mech

BTG-XXX-DWG-M-0384

HY-DG-41800059749

ESTIMATED CURVE OF BFP SET NPSHR (0%,


1%, 3% & 40000 HRS)

1136

HYD

Mech

BTG-XXX-DWG-M-0385

HY-DG-41810059671

ESTIMATED PERFORMANCE CURVE WITH 2


CEPS UNDER PARALLEL

4 (i)

1137

HYD

MECH

BTG-XXX-DWG-M-0386

316310000XX (Typical)

CROSS SECTION DRAWING OF DEAREATOR

1138

HYD

MECH

BTG-XXX-DWG-M-0387

2-162-01-00xxx

GENERAL ARRANGEMENT DRG OF DRAIN


COOLER

1139

HYD

MECH

BTG-LCC-DWG-M-0388

2-162-22-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER


#2

1140

HYD

MECH

BTG-LCC-DWG-M-0389

2-162-26-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER


#3

1141

HYD

MECH

BTG-LCC-DWG-M-0390

2-162-26-00xxx

GENERAL ARRANGEMENT DRG OF LP HEATER


#4

1142

HYD

MECH

BTG-XXX-DWG-M-0391

1-163-10-11xxx

GENERAL ARRANGEMENT DRG OF SPRAY


CUM TRAY DEAERATOR

1143

HYD

MECH

BTG-LAD-DWG-M-0392

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 6A

1144

HYD

MECH

BTG-LAD-DWG-M-0393

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 6B

1145

HYD

MECH

BTG-LAD-DWG-M-0394

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 7A

1146

HYD

MECH

BTG-LAD-DWG-M-0395

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 7B

1147

HYD

MECH

BTG-LAD-DWG-M-0396

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 8A

1148

HYD

MECH

BTG-LAD-DWG-M-0397

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF HP HEATER


# 8B

1149

HYD

MECH

BTG-XXX-DWG-M-0398

2-175-05-01xxx

GENERAL ARRANGEMENT DRG OF BFPDT OIL


COOLER

1150

HYD

I&C

BTG-LCC-DWG-M-0399

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #2

1151

HYD

I&C

BTG-LCC-DWG-M-0400

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #3

1152

HYD

I&C

BTG-LCC-DWG-M-0401

3-162-22-00xxx

STAND PIPE DRAWING FOR LP HEATER #4

1153

HYD

I&C

BTG-LBQ-DWG-M-0402

3-175-01-00xxx

STAND PIPE DRAWING FOR HP HEATERS

1154

HYD

MECH

BTG-XXX-DWG-M-0403

2-163-19-11xxx

STAND PIPE ASSEMBLY DRAWIGN FOR


DEAERATOR

126 OF 276

4 (i)

2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)
2 (iv)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1155

MU /PEM System/
group
HYD

MECH

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-XXX-DWG-M-0404

2-163-35-11xxx

OPERAION AND MAINTENANCE PLATFORM


ASSEMBLY DRAWING FOR DEAERATOR

Dept

LNTP
Purpose reference
(I/ A)
I

1156

HYD

MECH

BTG-LCC-DSH-M-0405

4-14-3202

DATA SHEET FOR LP HEATER #2

1157

HYD

MECH

BTG-LCC-DSH-M-0406

4-14-3203

DATA SHEET FOR LP HEATER #3

1158

HYD

MECH

BTG-LCC-DSH-M-0407

4-14-3204

DATA SHEET FOR LP HEATER #4

1159

HYD

MECH

BTG-LAD-DSH-M-0408

4-14-3205

DATA SHEET FOR HP HEATERS # 6A/B

1160

HYD

MECH

BTG-LAD-DSH-M-0409

4-14-3206

DATA SHEET FOR HP HEATERS # 7A/B

1161

HYD

MECH

BTG-LAD-DSH-M-0410

4-14-3207

DATA SHEET FOR HP HEATERS # 8A/B

1162

CBU

MDL

Err:512

EP-3-MD-107-001

MASTER DRAWINGS LIST

1163

CBU

LV SWGR

BTG-XXX-DSH-M-0411

EP-3-GN-107-001

DATA SHEET-LT SWITCHGEAR

1164

CBU

LV SWGR

BTG-BHA-QAP-E-0363

EP-3-GN-107-002

Manufacturing Quality Plan for LV SWGR

1165

CBU

LV SWGR

EP-3-GN-107-003

Manufacturing Quality Plan for LV Busduct

1166

CBU

LV SWGR

EP-3-GN-107-004

Manufacturing Quality Plan for LPBS

1167

CBU

LV SWGR

EP-3-GN-107-005

GENERAL NOTES AND FEATURES

1168

CBU

LV SWGR

EP-3-GN-107-006

TYPICAL SLD FOR LV SWGR

1169

CBU

LV SWGR

EP-3-GN-107-007

LEGENDS DETAIL

1170

CBU

LV SWGR

EP-3-GN-107-008

MAKES OF COMPONENTS

1171

CBU

LV SWGR

EP-3-GN-107-009

TYPE-II CORDINATION TABLE FOR MCCB

1172

CBU

LV SWGR

BTG-XXX-DSH-E-0368

EP-3-GN-107-010

Master Component Selection Table

1173

CBU

LV SWGR

BTG-XXX-RPT-E-0366

EP-3-GN-107-011

TYPE TEST Reports for LV SWGR

1174

CBU

LV SWGR

EP-3-GN-107-012

TYPE TEST Reports for LV Busduct

BTG-XXX-DSH-M-0413

BTG-XXX-DSH-M-0412

127 OF 276

I
I
A
A
A
A
A
A
A
A
I
I
I

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 2 (i)
Sl no. 2 (i)
Sl no. 2 (i)
Sl no. 1 (i)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1175

CBU

LV SWGR

BTG-XXX-CAL-E-0364

EP-3-GN-107-013

SHORT CIRCUIT CALUCLATIONS

1176

CBU

LV SWGR

BTG-XXX-CAL-E-0367

EP-3-GN-107-014

Bus Bar Calculations for LV SWGR

1177

CBU

LV SWGR

EP-3-GN-107-015

Bus Bar Calculations for LV Busduct

1178

CBU

LV SWGR

BTG-XXX-CAL-E-0365

EP-3-GN-107-016

BURDEN SIZING CALUCLATIONS

1179

CBU

LV SWGR

BTG-XXX-DSH-E-0369

EP-3-GN-107-017

Module Sizes

1180

CBU

LV SWGR

Err:512

EP-3-GN-107-018

O & M MANUAL FOR LV SWITCHGEAR

1181

CBU

LV SWGR

EP-3-GN-107-019

TOOLS & TACKLE AS PER ANNEXURE-C

1182

CBU

LV SWGR

EP-3-GN-107-020

E & C SPARES AS PER ANNEXURE-D

1183

CBU

LV SWGR

EP-3-GN-107-021

MANDATORY SPARE AS PER ANNEXURE-E

1184

CBU

LV SWGR

EP-3-GN-107-022

NETWORKING HARDWARE FOR NUMERICAL


RELAYS

1185

CBU

LV SWGR

EP-3-GN-107-023

MATERIAL REQUIRED FOR SITE MODIFICATION


(1% OF TOTAL SUPPLY VALUE)

1186

1187

1188

1189

1190

CBU

CBU

CBU

CBU

CBU

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

BTG-CBA-DWG-E-0370

BTG-CBA-DWG-E-0371

BTG-CBA-DWG-E-0372

BTG-BHA-DWG-E-0373

BTG-BHA-DWG-E-0374

EP-3-CS-107-001

EP-3-CS-107-002

EP-3-CS-107-003

EP-3-CS-107-004

EP-3-CS-107-005

128 OF 276

I
I
I
I
I
I
I
I
I

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)

SCHEME DIAGRAM FOR INCOMER-1(FOR


PCC/PMCC) CONTROLLED FROM
DCS/ECP(DAET I/C)

Sl no. 1 (i)

SCHEME DIAGRAM FOR INCOMER-2(FOR


PCC/PMCC) CONTROLLED FROM
DCS/ECP(DAET I/C)

Sl no. 1 (i)

SCHEME DIAGRAM FOR BUS Coupler (FOR


PCC/PMCC) CONTROLLED FROM
DCS/ECP(DAET B/C-1)

Sl no. 1 (i)
A

SCHEME DIAGRAM FOR INCOMER-1(FOR


PCC/PMCC) CONTROLLED LOCALLY(AET I/C)

SCHEME DIAGRAM FOR INCOMER-2(FOR


PCC/PMCC) CONTROLLED LOCALLY(AET I/C)

Sl no. 1 (i)

Sl no. 1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1191

1192

1193

1194

1195

1196

1197

1198

1199

1200

1201

1202

1203

MU /PEM System/
group
CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

CBU

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BHA-DWG-E-0375

EP-3-CS-107-006

SCHEME DIAGRAM FOR BUS COUPLER(FOR


PCC/PMCC) CONTROLLED LOCALLY(AET I/C)

SCHEME DIAGRAM FOR DG INCOMER


CONTROLLED FROM DDCIMS/ECP (DG-IC)

SCHEME DIAGRAM FOR TIE CONTROLLED


FROM DDCIMS/ECP (DAE TIE)

SCHEME DIAGRAM FOR INCOMER-1(FOR


MCC) CONTROLLED FROM DDCIMS (DAE I/C)

SCHEME DIAGRAM FOR INCOMER-2(FOR


MCC) CONTROLLED FROM DDCIMS (DAE I/C)

Dept

BTG-CBA-DWG-E-0376

BTG-CBA-DWG-E-0377

BTG-CBA-DWG-E-0378

BTG-CBA-DWG-E-0379

BTG-CBA-DWG-E-0380

BTG-BHA-DWG-E-0381

BTG-BHA-DWG-E-0382

BTG-CBA-DWG-E-0383

BTG-CBA-DWG-E-0384

BTG-BHA-DWG-E-0385

BTG-BHA-DWG-E-0386

BTG-BHA-DWG-E-0387

EP-3-CS-107-007

EP-3-CS-107-008

EP-3-CS-107-009

EP-3-CS-107-010

EP-3-CS-107-011

EP-3-CS-107-012

EP-3-CS-107-013

EP-3-CS-107-014

EP-3-CS-107-015

EP-3-CS-107-016

EP-3-CS-107-017

EP-3-CS-107-018

129 OF 276

SCHEME DIAGRAM FOR BUS COUPLER(FOR


MCC) CONTROLLED DDCIMS(DAE B/C-2)

LNTP
Purpose reference
(I/ A)
Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)
A

SCHEME DIAGRAM FOR INCOMER-1(FOR


MCC) CONTROLLED FROM LOCALLY(AE I/C)

Sl no. 1 (i)

SCHEME DIAGRAM FOR INCOMER-2(FOR


MCC) CONTROLLED FROM LOCALLY(AE I/C)

SCHEME DIAGRAM FOR BUS COUPLER(FOR


MCC) CONTROLLED DDCIMS(AE B/C-2)

Sl no. 1 (i)

Sl no. 1 (i)

SCHEME DIAGRAM FOR OUT GOING BREAKER


FEEDER (DAE O/G) CONTROLEED FROM
DDCIMS

Sl no. 1 (i)
A

SCHEME DIAGRAM FOR OUT GOING BREAKER


FEEDER (DAE O/G) CONTROLLED LOCALLY

Sl no. 1 (i)

SCHEME DIAGRAM FOR CONTACTOR


CONTROLLED MCCB INCOMER BELOW
250A(CC)

Sl no. 1 (i)
A

SCHEME DIAGRAM FOR MCCB INCOMER


BELOW 250A(E (I/C))

Sl no. 1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1204

MU /PEM System/
group
CBU

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BHA-DWG-E-0388

EP-3-CS-107-019

SCHEME DIAGRAM FOR MCCB BUSCOUPLER


BELOW 250A(E (I/C))

Dept

LNTP
Purpose reference
(I/ A)
Sl no. 1 (i)
A

1205

CBU

LV SWGR

BTG-BHA-DWG-E-0389

EP-3-CS-107-020

SCHEME DIAGRAM FOR TPN MCCB O/G(E3)

1206

CBU

LV SWGR

BTG-BHA-DWG-E-0390

EP-3-CS-107-021

SCHEME DIAGRAM FOR SINGLE PHASE MCCB


O/G(E1)

1207

CBU

LV SWGR

BTG-BHA-DWG-E-0391

EP-3-CS-107-022

SCHEME DIAGRAM FOR TPN CONTACTOR


CONTROLLED MCCB O/G (EA3)

SCHEME DIAGRAM FOR SINGLE PHASE


CONTACTOR CONTROLLED MCCB O/G (EA1)

SCHEME DIAGRAM FOR 220V DC INCOMER


UPTO 1000A FROM BATTERY (DB)

SCHEME DIAGRAM FOR 220V DC INCOMER


FROM CHARGER UPTO 630A (CH)

1208

1209

1210

CBU

CBU

CBU

LV SWGR

LV SWGR

LV SWGR

BTG-BHA-DWG-E-0392

BTG-BHA-DWG-E-0393

BTG-BHA-DWG-E-0394

EP-3-CS-107-023

EP-3-CS-107-024

EP-3-CS-107-025

Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)

CBU

LV SWGR

BTG-BHA-DWG-E-0395

EP-3-CS-107-026

SCHEME DIAGRAM FOR 220V DC INCOMER


UPTO 250A(HD)

1212

CBU

LV SWGR

BTG-BHA-DWG-E-0396

EP-3-CS-107-027

SCHEME DIAGRAM FOR 220V DC BUS


COUPLER (DC)

1213

CBU

LV SWGR

BTG-BHA-DWG-E-0397

EP-3-CS-107-028

SCHEME DIAGRAM FOR 220V DCDB BUS PT


MODULE FOR METERING & PROTECTION(S)

SCHEME DIAGRAM FOR 220V DC OUTGOING


FEEDER UPTO 200A (X)

A
A

CBU

LV SWGR

BTG-BHA-DWG-E-0398

EP-3-CS-107-029

1215

CBU

LV SWGR

BTG-BHA-DWG-E-0399

EP-3-CS-107-030

SCHEME DIAGRAM FOR 220V DC SOLENOID


VALVE FEEDER (DW)

1216

CBU

LV SWGR

BTG-BHA-DWG-E-0400

EP-3-CS-107-031

SCHEME DIAGRAM FOR BREAKER


CONTROLLED MOTOR INCLUDING 110 KW &
ABOVE UPTO 160 KW(DM/PM)

1217

CBU

LV SWGR

BTG-BHA-DWG-E-0401

EP-3-CS-107-032

130 OF 276

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER BELOW 30KW CONTROLLED
FROM ATRS/DDCMIS/PLC (AK2/DK2/PK2)

Sl no. 1 (i)
Sl no. 1 (i)

1211

1214

Sl no. 1 (i)

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)

Sl no. 1 (i)

Sl no. 1 (i)
Sl no. 1 (i)

A
Sl no. 1 (i)
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1218

1219

1220

1221

1222

1223

1224

MU /PEM System/
group
CBU

CBU

CBU

CBU

CBU

CBU

CBU

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BHA-DWG-E-0402

EP-3-CS-107-033

SCHEME DIAGRAM FOR CRITICAL


UNIDIRECTIONAL MOTOR FEEDER BELOW
30KW CONTROLLED FROM
ATRS/DDCMIS/PLC(AK2A/DK2A/PK2A)

Dept

BTG-BHA-DWG-E-0403

BTG-BHA-DWG-E-0404

BTG-BHA-DWG-E-0405

BTG-BHA-DWG-E-0406

BTG-BHA-DWG-E-0407

BTG-BHA-DWG-E-0408

EP-3-CS-107-034

EP-3-CS-107-035

EP-3-CS-107-036

EP-3-CS-107-037

EP-3-CS-107-038

EP-3-CS-107-039

131 OF 276

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER BELOW 30KW(WITH
REACCELARATION) CONTROLLED FROM
ATRS/DDCMIS/PLC(AK2E/DK2E/PK2E)

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER 30KW & ABOVE AND BELOW
110KW CONTROLLED FROM
ATRS/DDCMIS/PLC (AK21/DK21/PK21)

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER 30KW & ABOVE AND BELOW
110KW (WITH REACCELARATION)
CONTROLLED FROM
ATRS/DDCMIS/PLC(AK21E/DK21E/PK21E)

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER BELOW 30KW CONTROLLED
FROM MCC (K1)
SCHEME DIAGRAM FOR UNIDIRECTIONAL
MOTOR FEEDER 30KW & ABOVE AND BELOW
110KW CONTROLLED FROM MCC(K11)

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER BELOW 30KW CONTROLLED
FROM LCP(K2)

LNTP
Purpose reference
(I/ A)
Sl no. 1 (i)
A

Sl no. 1 (i)

Sl no. 1 (i)
A

Sl no. 1 (i)

Sl no. 1 (i)
A
Sl no. 1 (i)
A

Sl no. 1 (i)
A

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1225

1226

1227

1228

1229

1230

1231

MU /PEM System/
group
CBU

CBU

CBU

CBU

CBU

CBU

CBU

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BHA-DWG-E-0409

EP-3-CS-107-040

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER 30KW & ABOVE AND BELOW
110KW CONTROLLED FROM LCP (K21)

Dept

BTG-BHA-DWG-E-0410

BTG-BHA-DWG-E-0411

BTG-BHA-DWG-E-0412

BTG-BHA-DWG-E-0413

BTG-BHA-DWG-E-0414

BTG-BHA-DWG-E-0415

EP-3-CS-107-041

EP-3-CS-107-042

EP-3-CS-107-043

EP-3-CS-107-044

EP-3-CS-107-045

EP-3-CS-107-046

SCHEME DIAGRAM FOR UNIDIRECTIONAL


MOTOR FEEDER BELOW 30KW CONTROLLED
FROM LPBS(K3)
SCHEME DIAGRAM FOR UNIDIRECTIONAL
MOTOR FEEDER 30KW & ABOVE AND BELOW
110KW CONTROLLED (K31)

SCHEME DIAGRAM FOR BIDIRECTIONAL


MOTOR FEEDER BELOW 30KW CONTROLLED
FROM LCP(N1)
SCHEME DIAGRAM FOR BIDIRECTIONAL
MOTOR FEEDER BELOW 30KW CONTROLLED
FROM ATRS/DDCMIS/PLC(AN1/DN1/PN1)

LNTP
Purpose reference
(I/ A)
Sl no. 1 (i)
A

Sl no. 1 (i)
A
Sl no. 1 (i)
A

Sl no. 1 (i)
A
Sl no. 1 (i)
A

SCHEME DIAGRAM FOR BIDIRECTIONAL


MOTOR FEEDER WITH EQUALIZER MOTOR
(BYPASS VALVE) CONTROLLED FROM
ATRS/DDCMIS/PLC (AN2/BN2/PN2)

Sl no. 1 (i)
A

SCHEME DIAGRAM FOR CONTROL SUPPLY


OUTGOING(CS)

Sl no. 1 (i)

1232

CBU

LV SWGR

BTG-BHA-DWG-E-0416

EP-3-CS-107-047

SCHEME DIAGRAM FOR BUS PT MODULE FOR


MCC(VM)

1233

CBU

LV SWGR

BTG-BMA-DSH-E-0417

EP-3-CS-107-048

BUS PT MODULE FOR PCC / PMCC AND DG


PCC (G1/G2)

1234

CBU

LV SWGR

BTG-BHA-DWG-E-0418

EP-3-CS-107-049

SCHEME DIAGRAM FOR 220V DC CONTROL


SUPPLY MODULE ( IN B/C MODULE)

SCHEME DIAGRAM FOR SPACE HEATER


MODULE

1235

CBU

LV SWGR

BTG-BHA-DWG-E-0419

EP-3-CS-107-050

132 OF 276

Sl no. 1 (i)
Sl no. 1 (i)
Sl no. 1 (i)

Sl no. 1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1236

CBU

LV SWGR

BTG-BHA-DWG-E-0420

EP-3-CS-107-051

SCHEME DIAGRAM FOR SPACE HEATER &


SWITCH SOCKET

1237

CBU

LV SWGR

BTG-BHA-DWG-E-0421

EP-3-GA-107-301

GA DRAWING FOR 415V, UNIT-3 UNIT PMCC #


3DA

1238

CBU

LV SWGR

BTG-BHA-DWG-E-0422

EP-3-SL-107-301

SLD DRAWING FOR 415V, UNIT-3 UNIT PMCC #


3DA

1239

CBU

LV SWGR

BTG-BHA-DWG-E-0423

EP-3-GA-107-302

GA DRAWING FOR 415V, UNIT-3 EMERGENCY


MCC # 3DG

1240

CBU

LV SWGR

BTG-BHA-DWG-E-0424

EP-3-SL-107-302

SLD DRAWING FOR 415V, UNIT-3 EMERGENCY


MCC # 3DG

1241

CBU

LV SWGR

BTG-BMA-DWG-E-0425

EP-3-GA-107-303

GA DRAWING FOR 415V, UNIT-3 TURBINE


AUXILIARY MCC # 3KA

1242

CBU

LV SWGR

BTG-BMA-DWG-E-0426

EP-3-SL-107-303

SLD DRAWING FOR 415V, UNIT-3 TURBINE


AUXILIARY MCC # 3KA

1243

CBU

LV SWGR

BTG-BHA-DWG-E-0427

EP-3-GA-107-304

GA DRAWING FOR 415V, UNIT-3 BOILER


AUXILIARY MCC # 3HA

1244

CBU

LV SWGR

BTG-BHA-DWG-E-0428

EP-3-SL-107-304

SLD DRAWING FOR 415V, UNIT-3 BOILER


AUXILIARY MCC # 3HA

1245

CBU

LV SWGR

BTG-BHA-DWG-E-0429

EP-3-GA-107-305

GA DRAWING FOR 415V, UNIT-3 VENTILATION


MCC # 3TA

1246

CBU

LV SWGR

BTG-BHA-DWG-E-0430

EP-3-SL-107-305

SLD DRAWING FOR 415V, UNIT-3 VENTILATION


MCC # 3TA

1247

CBU

LV SWGR

BTG-BHR-DWG-E-0431

EP-3-GA-107-306

GA DRAWING FOR 415V, UNIT-3 AIR WASHER


MSS # 3SA

1248

CBU

LV SWGR

BTG-BHR-DWG-E-0432

EP-3-SL-107-306

SLD DRAWING FOR 415V, UNIT-3 AIR WASHER


MSS # 3SA

1249

CBU

LV SWGR

BTG-BLA-DWG-E-0433

EP-3-GA-107-307

GA DRAWING FOR 415V, UNIT-3 POWER


HOUSE ACDB (unit service ACDB) #3QA

SLD DRAWING FOR 415V, UNIT-3 POWER


HOUSE ACDB (unit service ACDB) #3QA

1250

CBU

LV SWGR

BTG-BLA-DWG-E-0434

EP-3-SL-107-307

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

Sl no. 2 (ii)

1251

CBU

LV SWGR

BTG-BLA-DWG-E-0435

EP-3-GA-107-308

GA DRAWING FOR 415V, UNIT-3 Boiler ACDB #


3HC

1252

CBU

LV SWGR

BTG-BLA-DWG-E-0436

EP-3-SL-107-308

SLD DRAWING FOR 415V, UNIT-3 Boiler ACDB #


3HC

1253

CBU

LV SWGR

BTG-BHR-DWG-E-0437

EP-3-GA-107-309

GA DRAWING FOR 415V, UNIT-3 TURBINE


VALVE ACDB # 3KB

1254

CBU

LV SWGR

BTG-BHR-DWG-E-0438

EP-3-SL-107-309

SLD DRAWING FOR 415V, UNIT-3 TURBINE


VALVE ACDB # 3KB

133 OF 276

Sl no. 1 (i)

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1255

CBU

LV SWGR

BTG-BLA-DWG-E-0439

EP-3-GA-107-310

GA DRAWING FOR 415V, UNIT-3 BOILER VALVE


ACDB # 3HB

1256

CBU

LV SWGR

BTG-BLA-DWG-E-0440

EP-3-SL-107-310

SLD DRAWING FOR 415V, UNIT-3 BOILER


VALVE ACDB # 3HB

1257

CBU

LV SWGR

BTG-BLA-DWG-E-0441

EP-3-GA-107-311

GA DRAWING FOR 220V UNIT-3 POWER


HOUSE MAIN DCDB #3FA

1258

CBU

LV SWGR

BTG-BLA-DWG-E-0442

EP-3-SL-107-311

SLD DRAWING FOR 220V UNIT-3 POWER


HOUSE MAIN DCDB #3FA

1259

CBU

LV SWGR

BTG-BLA-DWG-E-0443

EP-3-GA-107-312

GA DRAWING FOR 415V, UNIT-3 ESP & ID FAN


AREA MCC #3HD

1260

CBU

LV SWGR

BTG-BLA-DWG-E-0444

EP-3-SL-107-312

SLD DRAWING FOR 415V, UNIT-3 ESP & ID FAN


AREA MCC #3HD

1261

CBU

LV SWGR

BTG-BLA-DWG-E-0445

EP-3-GA-107-313

GA DRAWING FOR 415V, UNIT-3 ESP AC and


Ventilation MCC #3TB

1262

CBU

LV SWGR

BTG-BLA-DWG-E-0446

EP-3-SL-107-313

SLD DRAWING FOR 415V, UNIT-3 ESP AC and


Ventilation MCC #3TB

1263

CBU

LV SWGR

BTG-BLA-DWG-E-0447

EP-3-GA-107-401

GA DRAWING FOR 415V, UNIT-4 UNIT PMCC #


4DA

1264

CBU

LV SWGR

BTG-BLA-DWG-E-0448

EP-3-SL-107-401

SLD DRAWING FOR 415V, UNIT-4 UNIT PMCC #


4DA

1265

CBU

LV SWGR

BTG-BUA-DWG-E-0449

EP-3-GA-107-402

GA DRAWING FOR 415V, UNIT-4 EMERGENCY


MCC # 4DG

1266

CBU

LV SWGR

BTG-BUA-DWG-E-0450

EP-3-SL-107-402

SLD DRAWING FOR 415V, UNIT-4 EMERGENCY


MCC # 4DG

1267

CBU

LV SWGR

BTG-BLA-DWG-E-0451

EP-3-GA-107-403

GA DRAWING FOR 415V, UNIT-4 TURBINE


AUXILIARY MCC # 4KA

1268

CBU

LV SWGR

BTG-BLA-DWG-E-0452

EP-3-SL-107-403

SLD DRAWING FOR 415V, UNIT-4 TURBINE


AUXILIARY MCC # 4KA

1269

CBU

LV SWGR

BTG-BLA-DWG-E-0453

EP-3-GA-107-404

GA DRAWING FOR 415V, UNIT-4 BOILER


AUXILIARY MCC # 4HA

1270

CBU

LV SWGR

BTG-BLA-DWG-E-0454

EP-3-SL-107-404

SLD DRAWING FOR 415V, UNIT-4 BOILER


AUXILIARY MCC # 4HA

1271

CBU

LV SWGR

BTG-BHR-DWG-E-0455

EP-3-GA-107-405

GA DRAWING FOR 415V, UNIT-4 VENTILATION


MCC # 4TA

1272

CBU

LV SWGR

BTG-BHR-DWG-E-0466

EP-3-SL-107-405

SLD DRAWING FOR 415V, UNIT-4 VENTILATION


MCC # 4TA

1273

CBU

LV SWGR

BTG-BHA-DWG-E-0457

EP-3-GA-107-406

GA DRAWING FOR 415V, UNIT-4 AIR WASHER


MSS # 3SA

1274

CBU

LV SWGR

BTG-BHA-DWG-E-0458

EP-3-SL-107-406

SLD DRAWING FOR 415V, UNIT-4 AIR WASHER


MSS # 3SA

134 OF 276

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

1275

1276

MU /PEM System/
group
CBU

CBU

LV SWGR

LV SWGR

MASTER DRAWING LIST

2X660 MW IB VALLEY TPS

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

BTG-BHA-DWG-E-0459

EP-3-GA-107-407

GA DRAWING FOR 415V, UNIT-4 POWER


HOUSE ACDB (unit service ACDB) #4QA

SLD DRAWING FOR 415V, UNIT-4 POWER


HOUSE ACDB (unit service ACDB) #4QA

Dept

BTG-BHA-DWG-E-0460

EP-3-SL-107-407

LNTP
Purpose reference
(I/ A)
Sl no. 2 (ii)

Sl no. 2 (ii)

1277

CBU

LV SWGR

BTG-BMA-DWG-E-0461

EP-3-GA-107-408

GA DRAWING FOR 415V, UNIT-4 Boiler ACDB #


4HC

1278

CBU

LV SWGR

BTG-BMA-DWG-E-0462

EP-3-SL-107-408

SLD DRAWING FOR 415V, UNIT-4 Boiler ACDB #


4HC

1279

CBU

LV SWGR

BTG-BHA-DWG-E-0463

EP-3-GA-107-409

GA DRAWING FOR 415V, UNIT-4 TURBINE


VALVE ACDB # 4KB

1280

CBU

LV SWGR

BTG-BHA-DWG-E-0464

EP-3-SL-107-409

SLD DRAWING FOR 415V, UNIT-4 TURBINE


VALVE ACDB # 4KB

1281

CBU

LV SWGR

BTG-BHA-DWG-E-0465

EP-3-GA-107-410

GA DRAWING FOR 415V, UNIT-4 BOILER VALVE


ACDB # 4HB

1282

CBU

LV SWGR

BTG-BHA-DWG-E-0466

EP-3-SL-107-410

SLD DRAWING FOR 415V, UNIT-4 BOILER


VALVE ACDB # 4HB

1283

CBU

LV SWGR

BTG-BHR-DWG-E-0467

EP-3-GA-107-411

GA DRAWING FOR 220V UNIT-4 POWER


HOUSE MAIN DCDB #4FA

1284

CBU

LV SWGR

BTG-BHR-DWG-E-0468

EP-3-SL-107-411

SLD DRAWING FOR 220V UNIT-4 POWER


HOUSE MAIN DCDB #4FA

1285

CBU

LV SWGR

BTG-BLA-DWG-E-0469

EP-3-GA-107-412

GA DRAWING FOR 415V, UNIT-4 ESP & ID FAN


AREA MCC #4HD

1286

CBU

LV SWGR

BTG-BLA-DWG-E-0470

EP-3-SL-107-412

SLD DRAWING FOR 415V, UNIT-4 ESP & ID FAN


AREA MCC #4HD

1287

CBU

LV SWGR

BTG-BLA-DWG-E-0471

EP-3-GA-107-413

GA DRAWING FOR 415V, UNIT-4 ESP AC and


Ventilation MCC #4TB

1288

CBU

LV SWGR

BTG-BLA-DWG-E-0472

EP-3-SL-107-413

SLD DRAWING FOR 415V, UNIT-4 ESP AC and


Ventilation MCC #4TB

1289

CBU

LV SWGR

BTG-BLA-DWG-E-0473

EP-3-GA-107-001

GA DRAWING FOR 415V, AC MCC # 0TA

1290

CBU

LV SWGR

BTG-BLA-DWG-E-0474

EP-3-SL-107-001

SLD DRAWING FOR 415V, AC MCC # 0TA

1291

CBU

LV SWGR

BTG-BLA-DWG-E-0475

EP-3-GA-107-002

GA DRAWING FOR 415V COMPRESSOR


HOUSE ACDB # 0SA

SLD DRAWING FOR 415V COMPRESSOR


HOUSE ACDB # 0SA

1292

CBU

LV SWGR

BTG-BLA-DWG-E-0476

EP-3-SL-107-002

135 OF 276

A
A

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

Sl no. 2 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1293

CBU

LV SWGR

BTG-BLA-DWG-E-0477

EP-3-GA-107-003

GA DRAWING FOR 415V, UNIT-3 STATION PMCC


#0DA

1294

CBU

LV SWGR

BTG-BLA-DWG-E-0478

EP-3-SL-107-003

SLD DRAWING FOR 415V, UNIT-3 STATION


PMCC #0DA

1295

CBU

LV SWGR

BTG-BLA-DWG-E-0479

EP-3-GA-107-004

GA DRAWING FOR 415V, UNIT-3 MISC SERVICE


MCC #0QA

1296

CBU

LV SWGR

BTG-BLA-DWG-E-0480

EP-3-SL-107-004

SLD DRAWING FOR 415V, UNIT-3 MISC


SERVICE MCC #0QA

1297

CBU

LV SWGR

BTG-BUA-DWG-E-0481

EP-3-GA-107-005

GA DRAWING FOR 415V CPU MCC # 0SB

1298

CBU

LV SWGR

BTG-BUA-DWG-E-0482

EP-3-SL-107-005

SLD DRAWING FOR 415V CPU MCC # 0SB

1299

CBU

LV SWGR

BTG-BLA-DWG-E-0483

EP-3-GA-107-006

GA DRAWING FOR 415V, UNIT-4 STATION PMCC


#0DB

1300

CBU

LV SWGR

BTG-BLA-DWG-E-0484

EP-3-SL-107-006

SLD DRAWING FOR 415V, UNIT-4 STATION


PMCC #0DB

1301

CBU

LV SWGR

BTG-BHR-DWG-E-0485

EP-3-GA-107-007

GA DRAWING FOR 415V, UNIT-4 MISC SERVICE


MCC #0QA

1302

CBU

LV SWGR

BTG-BHR-DWG-E-0486

EP-3-SL-107-007

SLD DRAWING FOR 415V, UNIT-4 MISC


SERVICE MCC #0QA

1303

CBU

LV SWGR

BTG-BHA-DWG-E-0487

EP-3-GA-107-008

GA DRG OF 415V AC MCCB FUSE DB

1304

CBU

LV SWGR

BTG-BHA-DWG-E-0488

EP-3-SL-107-008

SLD OF 415V AC MCCB DB

1305

CBU

LV SWGR

BTG-BHA-DWG-E-0489

EP-3-GA-107-009

GA DRG OF 220V DC MCCB DB

1306

CBU

LV SWGR

BTG-BHA-DWG-E-0490

EP-3-SL-107-009

SLD OF 220V DC MCCB DB

1307

CBU

LV SWGR

BTG-BHA-DWG-E-0491

EP-3-GA-107-010

GA DRG OF LOCAL MOTOR STARTER-0.37KW

1308

CBU

LV SWGR

BTG-BHA-DWG-E-0492

EP-3-GA-107-011

GA DRG OF LOCAL MOTOR STARTER-0.55KW

1309

CBU

LV SWGR

BTG-BHA-DWG-E-0493

EP-3-GA-107-012

GA DRG OF LOCAL MOTOR STARTER-0.75KW

1310

CBU

LV SWGR

BTG-BHA-DWG-E-0494

EP-3-GA-107-013

GA DRG OF LOCAL MOTOR STARTER-1.50KW

1311

CBU

LV SWGR

BTG-BHA-DWG-E-0495

EP-3-GA-107-014

GA DRG OF LOCAL MOTOR STARTER-1.10KW

1312

CBU

LV SWGR

BTG-BHA-DWG-E-0496

EP-3-GA-107-015

GA DRG OF LOCAL MOTOR STARTER-2.20KW

136 OF 276

A
A

A
A
A
A
A
A
A
A
A
A

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1313

CBU

LV SWGR

BTG-BHA-DWG-E-0497

EP-3-GA-107-016

GA DRG OF LOCAL MOTOR STARTER-3.70KW

1314

CBU

LV SWGR

BTG-BHA-DWG-E-0498

EP-3-GA-107-017

GA DRG OF TYPE -A EMERGENCY START AND


STOP LOCAL PUSH BUTTON

GA DRG OF TYPE -B EMERGENCY OPEN,


CLOSE AND STOP LOCAL PUSH BUTTON

1315

CBU

LV SWGR

BTG-BHA-DWG-E-0499

EP-3-GA-107-018

Sl no. 2 (ii)

Sl no. 2 (ii)

1316

CBU

LV SWGR

BTG-BHA-DWG-E-0500

EP-3-GA-107-019

DATA CONCENTRATOR SYSTEM

1317

CBU

LV SWGR

BTG-BHA-DWG-E-0501

EP-3-GA-107-020

GA DRAWING FOR LT BUSDUCT-4000A

1318

CBU

LV SWGR

BTG-BHA-DWG-E-0502

EP-3-GA-107-021

GA DRAWING FOR LT BUSDUCT-2500A

1319

ISG

MDL

BTG-BRV-LIST-E-0489

ISG-679-MDL-001

MASTER DRAWING LIST ISG- 3 X 1750KVA DG


SETS

1320

ISG

DG SET

BTG-XXX-DSH-M-0414

IS-4-DS-679-800-A001

DATA SHEET FOR ENGINE

1321

ISG

DG SET

BTG-BRV-DSH-E-0490

IS-4-DS-679-800-A002

DATA SHEET FOR ALTERNATOR

1322

ISG

DG SET

BTG-BRV-DSH-E-0491

IS-4-DS-679-800-A003

DATA SHEET FOR DG SET

1323

ISG

DG SET

BTG-BRV-DSH-E-0492

IS-4-DS-679-800-A004

DATA SHEET OF BATTERY

1324

ISG

DG SET

BTG-XXX-DSH-M-0415

IS-4-DS-679-800-A005

DATA SHEET OF EXHAUST & FUEL SYSTEM


PIPE

1325

ISG

DG SET

BTG-XXX-DWG-M-0458

IS-3-GA-679-800-A001

GA DRAWING OF ENGINE

1326

ISG

DG SET

BTG-BRV-DWG-E-0493

IS-3-GA-679-800-A002

GA DRAWING OF ALTERNATOR

1327

ISG

DG SET

BTG-PRV-DWG-M-0459

IS-3-GA-679-800-A003

GA DRAWING OF DG SET

1328

ISG

DG SET

BTG-BRV-DWG-E-0494

IS-3-GA-679-800-A004

GA OF LOAD SIDE TERMINAL BOX

1329

ISG

DG SET

BTG-BRV-DWG-E-0495

IS-3-GA-679-800-A005

GA OF NEUTRAL SIDE TERMINAL BOX

1330

ISG

DG SET

BTG-HJF-DWG-M-0416

IS-3-GA-679-800-A007

GA OF FUEL TANK (990Ltrs.)

1331

ISG

DG SET

BTG-XXX-DWG-S-0081

IS-3-GA-679-800-A008

GA OF BASE FRAME

137 OF 276

Sl no. 2 (ii)

A
A
A
A

Sl no. 2 (ii)
Sl no. 2 (ii)
Sl no. 2 (ii)
1 (i)

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

S. No.

MU /PEM System/
group

MASTER DRAWING LIST

OPGC Document No.

Drawing/Doc. No.

Drawing/document title

2X660 MW IB VALLEY TPS

Dept

LNTP
Purpose reference
(I/ A)

1332

ISG

DG SET

BTG-UNY-DWG-S-0082

IS-2-GA-679-800-A009

GA OF EXHAUST PIPE SUPPORT STRUCTURE A

1333

ISG

DG SET

BTG-UMC-DWG-S-0083

IS-3-DG-679-800-A010

FOUNDATION PLAN FOR DG

1334

ISG

DG SET

BTG-XXX-DWG-E-0520

IS-3-DG-679-800-A011

LAYOUT PLAN FOR 3 X 1750KVA DG SETS

1335

ISG

DG SET

BTG-BRV-DWG-E-0521

IS-3-MS-679-800-A001

GA, SCHEMATIC & BILL OF MATERIALS FOR


AMF PANEL

1336

ISG

DG SET

BTG-BRV-DWG-E-0496

IS-3-MS-679-800-A002

GA, SCHEMATIC & BILL OF MATERIALS FOR


AUXILIARY DISTRIBUTION BOARD

1337

ISG

DG SET

BTG-BRV-DWG-E-0497

IS-3-MS-679-800-A003

GA, BILL OF MATERIALS FOR POWER BUSBAR A


PANEL

1338

ISG

DG SET

BTG-BRV-DWG-E-0498

IS-3-MS-679-800-A005

GA, SCHEMATIC & BILL OF MATERIALS FOR


BATTERY CHARGER PANEL

1339

ISG

DG SET

BTG-BRV-QAP-E-0499

IS-4-QP-679-800-A001

QAP OF DG SET

1340

ISG

DG SET

BTG-XXX-QAP-I-0146

IS-4-QP-679-800-A002

QAP OF CONTROL PANELS

1341

ISG

DG SET

Err:512

IS-4-OM-679-800-A001

O & M MANUAL

138 OF 276

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP

FCAT

COMP_S

COMP_A

A
C
A
B

LNTP

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

14-Aug-13
10-Sep-13
15-Oct-13
14-Aug-13

26-Aug-13
25-Sep-13
16-Oct-13
25-Sep-13

24-Sep-13
31-Jan-14
19-Dec-13
19-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

B
15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

10-Feb-14
A
10-Feb-14
A
10-Feb-14
A

16-Dec-13

10-Feb-14
A

24-Feb-14

3-Mar-14

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

1-Nov-13

15-Sep-13

13-Sep-13

11-Nov-13

LNTP

18-Feb-14

R2SUB_A_DT R2APP_A_DT

LNTP

LNTP

10-Feb-14

16-Dec-13

11-Nov-13

LNTP

16-Dec-13

LNTP

11-Feb-14

16-Dec-13

11-Nov-13

LNTP

1-Jan-14

LNTP

4-Nov-13

16-Dec-13

11-Nov-13

LNTP

10-Oct-13

LNTP

11-Nov-13

LNTP

C
C
A

R1SUB_A_DT R1APP_A_DT R1APP


CAT

LNTP

LNTP

FAPP
CAT

2X660 MW IB VALLEY TPS

C
C
B

7-Dec-13

3-Mar-14

7-Dec-13

11-Feb-14

7-Dec-13

11-Feb-14

16-Dec-13

10-Feb-14

6-Sep-13

1-Nov-13

15-Sep-13

6-Sep-13

27-Nov-13

139 OF 276

A
B

E
B

15-Sep-13

C
C

24-Feb-14

3-Mar-14

24-Feb-14

3-Mar-14

B
7-Dec-13

15-Feb-14

19-Dec-13

10-Feb-14

A
B

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

B
A
E
E
E
E
E
E
E

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Sep-13

6-Sep-13

1-Oct-13

15-Sep-13

6-Sep-13

27-Nov-13

15-Sep-13

6-Sep-13

5-Dec-13

15-Oct-13

16-Oct-13

25-Oct-13

15-Oct-13
15-Oct-13
15-Oct-13

16-Oct-13
16-Oct-13
16-Oct-13

8-Jan-14
31-Dec-13
31-Dec-13

15-Oct-13

24-Oct-13

27-Jan-14

15-Oct-13

16-Oct-13

1-Nov-13

15-Oct-13

16-Oct-13

31-Dec-12

E
LNTP

LNTP

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

E
E
E
E
A
E
B
E
A

C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT
7-Dec-13

12-Mar-14

1-Jan-14

10-Feb-14

5-Nov-13

8-Jan-14

28-Jan-14

6-Feb-14

1-Jan-14

13-Feb-14

28-Jan-14

3-Feb-14

28-Jan-14

12-Mar-14

R2SUB_A_DT R2APP_A_DT

B
B

24-Feb-14

3-Mar-14

28-Jan-14

6-Feb-14

28-Jan-14

3-Feb-14

E
C
B
E

B
E

E
E
C

E
15-Oct-13

16-Oct-13

14-Nov-13

15-Oct-13

16-Oct-13

14-Nov-13

E
LNTP

FAPP
CAT

2X660 MW IB VALLEY TPS

B
15-Nov-13

13-Nov-13

8-Jan-14

15-Nov-13

13-Nov-13

31-Dec-13

15-Nov-13

13-Nov-13

31-Dec-13

15-Nov-13

13-Nov-13

31-Dec-13

15-Nov-13
15-Nov-13
15-Nov-13

13-Nov-13
13-Nov-13
13-Nov-13

1-Jan-14
31-Dec-13
27-Jan-14

15-Nov-13

13-Nov-13

31-Jan-14

15-Nov-13

13-Nov-13

1-Jan-14

140 OF 276

B
B
B
B
B
E
B

E
28-Jan-14

6-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

7-Feb-14

28-Jan-14

3-Feb-14

6-Feb-14

19-Feb-14

E
E
E
E
A
B

E
B

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
6 (ii)
Readiness of
release
fabrication
drawings will
be
demonstrated.

6 (iii)
Readiness of
release
fabrication
drawings will
be
demonstrated.

After LU
After LU
NTP
NTP
NTP
NTP
NTP

FCAT

E
B
E
E

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Nov-13

13-Nov-13

1-Jan-14

15-Nov-13

13-Nov-13

24-Dec-13

15-Nov-13

13-Nov-13

1-Jan-14

15-Nov-13

19-Nov-13

8-Jan-14

27-Jan-14

17-Jan-14

27-Jan-14

17-Jan-14

15-Feb-14

24-Feb-14

FAPP
CAT
B
C
B
E

0
0
E
0
0
0
0

7-Mar-14

15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14

24-Feb-14
24-Feb-14

141 OF 276

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT
28-Jan-14

6-Feb-14

28-Jan-14

6-Feb-14

28-Jan-14

6-Feb-14

E
B
E

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

0
E
E
E
0
B
A
A
A
B
0
0
E
0
0
0
0
0
0

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

15-Feb-14

24-Feb-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Feb-14

24-Feb-14

7-Mar-14

15-Oct-13

16-Oct-13

8-Jan-14

15-Oct-13

24-Oct-13

8-Jan-14

15-Oct-13

16-Oct-13

8-Jan-14

15-Feb-14

24-Feb-14

7-Mar-14

16-Oct-13

8-Jan-14

24-Feb-14

7-Mar-14

R1SUB_A_DT R1APP_A_DT R1APP


CAT

E
E
E

15-Mar-14
B
B
B
B

6-Feb-14

19-Feb-14

6-Feb-14

19-Feb-14

6-Feb-14

19-Feb-14

28-Jan-14

6-Feb-14

A
A
A

15-Apr-14
15-Apr-14
15-Oct-13
15-Mar-14
15-Mar-14
15-Mar-14
15-Mar-14
15-Mar-14
15-Mar-14
15-Feb-14

2X660 MW IB VALLEY TPS

142 OF 276

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER
DRAWING
LIST
FSUB_A_DT
FAPP_A_DT
FAPP
R1SUB_A_DT

FSUB_S_DT

CAT
NTP

NTP
NTP
NTP

0
0
0
0

NTP

24-Feb-14

7-Mar-14

7-Dec-13

9-Jan-14

15-Apr-14
15-Apr-14
12-Aug-14
15-Dec-13

NTP

15-Apr-14

E
NTP

R2SUB_A_DT R2APP_A_DT

15-Feb-14
B

NTP

2X660 MW IB VALLEY TPS


R1APP_A_DT R1APP
CAT

E
15-Jun-15
15-Sep-14

0
NTP
NTP
NTP
NTP
NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

B
B
B
B
B
B
A
C
E
E
B
C
C

15-Nov-13

25-Nov-13

8-Jan-14

15-Nov-13

25-Nov-13

8-Jan-14

15-Nov-13

25-Nov-13

8-Jan-14

15-Dec-13

7-Dec-13

8-Jan-14

15-Dec-13

7-Dec-13

27-Jan-14

1-Jan-14

1-Jan-14

15-Feb-14

26-Aug-13

26-Aug-13

24-Sep-13

26-Sep-13
26-Sep-13

25-Sep-13
13-Sep-13

31-Jan-14
5-Dec-13

26-Sep-13

13-Sep-13

5-Dec-13

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13
26-Sep-13

13-Sep-13
25-Sep-13

16-Oct-13
16-Oct-13

143 OF 276

B
B
B
B
B
B
C
C
C
B
C
C
C

10-Oct-13

4-Nov-13

24-Feb-14
16-Dec-13

5-Feb-14

16-Dec-13

26-Jan-14

19-Dec-13

12-Feb-14

6-Feb-14
13-Feb-14

1-Mar-14
19-Feb-14

E
E
B
C
C

5-Mar-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

A
B
C
C
E
E
A
A
C
E
E
E

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

E
E
A
A
A
B

LNTP
LNTP
LNTP
LNTP

A
A
B

LNTP
LNTP

LNTP
LNTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13

13-Sep-13

31-Dec-13

26-Sep-13

25-Sep-13

19-Dec-13

26-Sep-13

25-Sep-13

1-Feb-14

26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13

25-Feb-14
1-Nov-13
16-Oct-13

26-Sep-13

13-Sep-13

16-Oct-13

26-Sep-13

13-Sep-13

25-Feb-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13

13-Sep-13

10-Jan-14

26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
25-Sep-13
13-Sep-13
13-Sep-13

10-Jan-14
10-Jan-14
11-Nov-13
5-Dec-13
11-Nov-13
14-Nov-13
14-Nov-13

E
E
B
B
B
C

26-Sep-13
26-Sep-13
26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13

14-Nov-13
14-Nov-13
31-Dec-13
31-Dec-13

C
C
B

26-Sep-13
26-Sep-13

13-Sep-13
13-Sep-13

31-Dec-13
31-Dec-13

26-Sep-13
26-Sep-13

25-Sep-13
13-Sep-13

8-Jan-14
14/11/13

144 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

A
B
C
C
E
C
C
C

5-Mar-14
24-Feb-14

7-Dec-13
7-Dec-13

10-Jan-14
14-Jan-14

7-Dec-13

10-Jan-14

15-Feb-14

22-Feb-14

15-Feb-14

22-Feb-14

15-Feb-14

22-Feb-14

7-Dec-13
7-Dec-13
7-Dec-13
24-Dec-13
24-Dec-13

31-Dec-13
1-Jan-14
31-Dec-13
5-Feb-14
5-Feb-14

A
C
A
B

24-Dec-13
24-Dec-13
13-Jan-14
13-Jan-14

5-Feb-14
5-Feb-14
5-Feb-14
5-Feb-14

B
B
B

13-Jan-14
13-Jan-14

5-Feb-14

19-Feb-14

13-Jan-14
3-Jan-14

28-Feb-14
27-Jan-14

5-Mar-14

B
B

15-Feb-14
10-Feb-14

22-Feb-14
22-Feb-14

10-Feb-14

22-Feb-14

24-Dec-13

8-Jan-14

15-Feb-14
15-Feb-14
19-Feb-14
19-Feb-14

26-Feb-14
26-Feb-14

C
B
B
B

E
E
E

27-Feb-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
NTP
NTP

FCAT

COMP_A

A
A
E
E
0
0

34th Month
from NTP

34th Month
from NTP

34th Month
from NTP

40th Month
from NTP

1 Month
before Supply
of items

LNTP
LNTP

COMP_S

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Sep-13

13-Sep-13

14/11/13

26-Sep-13

13-Sep-13

14/11/13

26-Sep-13
26-Sep-13
3-Jul-14
3-Jul-14

13-Sep-13
13-Sep-13

31-Dec-13
31-Dec-13

27-Aug-13
27-Sep-13

26-Aug-13
4-Sep-13

24-Sep-13
1-Oct-13

C
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

B
B

A
E

R1SUB_A_DT R1APP_A_DT R1APP


CAT
3-Jan-14

27-Jan-14

3-Jan-14

27-Jan-14

B
B

13-Jan-14
13-Jan-14

5-Feb-14
5-Feb-14

E
E

10-Oct-13
2-Nov-13

4-Nov-13

C
C

R2SUB_A_DT R2APP_A_DT

A
A

FAPP
CAT

2X660 MW IB VALLEY TPS

12-Mar-14
28-Feb-14

15-Mar-14

27-Sep-13

4-Sep-13

19-Nov-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

6-Nov-13

145 OF 276

C
C
C
C
C
E

16-Dec-13
12-Nov-13

20-Jan-14

12-Nov-13

3-Feb-14

12-Nov-13

3-Feb-14

12-Nov-13

16-Jan-14

B
B
C
A

28-Feb-14
6-Mar-14
6-Feb-14

10-Mar-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP

FCAT

C
C

LNTP

COMP_S

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

12-Mar-14

27-Sep-13

13-Sep-13

25-Oct-13

12-Mar-14

27-Sep-13

13-Sep-13

25-Oct-13

27-Sep-13

13-Sep-13

4-Nov-13

28-Feb-14

COMP_A

MASTER DRAWING LIST

10-Mar-14

A
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

30-Jan-14

A
C
B
B
B
B
B
C
B
A
B
26-Feb-14

B
B
B

C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

12-Nov-13

16-Jan-14

6-Feb-14

10-Mar-14

12-Nov-13

16-Jan-14

6-Feb-14

10-Mar-14

21-Nov-13

20-Dec-13

1-Jan-14

31-Jan-14

10-Jan-14

16-Jan-14

27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

27-Dec-13

9-Jan-14

12-Feb-14

10-Mar-14

FAPP
CAT

2X660 MW IB VALLEY TPS

7-Mar-14

27-Sep-13

13-Sep-13

19-Nov-13

27-Sep-13

21-Sep-13

18-Feb-14

27-Sep-13

13-Sep-13

24-Oct-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13

7-Aug-13

4-Sep-13

27-Sep-13
27-Sep-13

7-Aug-13
17-Sep-13

4-Sep-13
1-Oct-13

27-Sep-13

13-Sep-13

12-Nov-13

27-Sep-13

13-Sep-13

16-Nov-13

27-Sep-13

13-Sep-13

16-Nov-13

27-Sep-13

13-Sep-13

27-Nov-13

27-Sep-13

13-Sep-13

27-Nov-13

27-Sep-13

13-Sep-13

11-Nov-13

146 OF 276

C
B
C
C
C
C
C
C
C
C
C
B
C
B
C
C
C

C
C
B

7-Dec-13

31-Jan-14

15-Mar-14
7-Dec-13

26-Jan-14

17-Sep-13

26-Sep-13

11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

11-Sep-13

12-Sep-13

16-Sep-13
21-Dec-13

20-Jan-14
15-Jan-14

27-Dec-13

11-Feb-14

21-Dec-13

18-Feb-14

21-Dec-13

10-Feb-14

27-Dec-13

18-Feb-14

21-Dec-13

18-Feb-14

21-Dec-13

18-Feb-14

A
C
C
C
C
C
C
C
B
A
B

26-Feb-14

B
B

26-Feb-14

B
B

26-Feb-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

COMP_S

COMP_A

B
B
B
B
B
B
B
C
A
A
A
C
A
A
C
C
A
B

LNTP

10-Jan-14

31-Jan-14

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

27-Sep-13

13-Sep-13

11-Nov-13

27-Sep-13

13-Sep-13

16-Nov-13

27-Sep-13

13-Sep-13

13-Nov-13

27-Sep-13

13-Sep-13

6-Nov-13

27-Sep-13

13-Sep-13

11/27/2013

27-Sep-13

13-Sep-13

11/27/2013

27-Oct-13
27-Oct-13
27-Nov-13

7-Sep-13
25-Sep-13
17-Sep-13

1-Oct-13
8-Nov-13
24-Oct-13

27-Nov-13

19-Sep-13

11-Nov-13

27-Nov-13

19-Sep-13

11-Nov-13

27-Nov-13

23-Nov-13

18-Dec-13

27-Nov-13
27-Nov-13
27-Nov-13

12-Nov-13
17-Sep-13
25-Sep-13

7-Dec-13
24-Oct-13
24-Oct-13

27-Nov-13

25-Sep-13

24-Oct-13

27-Nov-13

17-Sep-13

7-Nov-13

27-Nov-13

21-Nov-13

18-Dec-13

27-Nov-13

13-Sep-13

25-Oct-13

A
LNTP

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

21-Dec-13

18-Feb-14

26-Feb-14

21-Dec-13

10-Feb-14

21-Dec-13

10-Feb-14

27-Dec-13

11-Feb-14

21-Dec-13

18-Feb-14

21-Dec-13

18-Feb-14

11-Oct-13
7-Dec-13
9-Nov-13

24-Oct-13
27-Dec-13
18-Dec-13

7-Dec-13

31-Dec-13

7-Dec-13

31-Dec-13

10-Jan-14

31-Jan-14

27-Nov-13

13-Sep-13

25-Oct-13

27-Dec-13
20-Jan-14
7-Dec-13

9-Jan-14
13-Feb-14
15-Jan-14

21-Dec-13

9-Jan-14

19-Nov-13

9-Jan-14

24-Dec-13

18-Feb-14

12-Nov-13

24-Dec-13

27-Nov-13

13-Sep-13

11-Dec-13

147 OF 276

B
B
B
B
B
B
C

26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
31-Oct-13
9-Jan-14

6-Dec-13
18-Jan-14

1-Feb-14

7-Mar-14

1-Feb-14

7-Mar-14

22-Jan-14

31-Jan-14

A
B
B

B
A
C
C
B
B

6-Mar-14
7-Mar-14
24-Jan-14

13-Feb-14

28-Feb-14
28-Feb-14

10-Mar-14

26-Feb-14

10-Mar-14

C
11-Nov-13

6-Mar-14

A
LNTP

FAPP
CAT

2X660 MW IB VALLEY TPS

24-Dec-13
C

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

LNTP

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

27-Nov-13

13-Sep-13

11-Mar-14

E
27-Nov-13

13-Sep-13

A
A

LNTP

27-Nov-13

19-Nov-13

20-Dec-13

27-Nov-13

21-Nov-13

20-Dec-13

27-Nov-13

13-Sep-13

24-Oct-13

A
LNTP

26-Feb-14

27-Nov-13

13-Sep-13

13-Sep-13

27-Nov-13

13-Sep-13

LNTP

13-Sep-13

LNTP

B
A

13-Feb-14

4-Jan-14

6-Feb-14

28-Feb-14

10-Mar-14

C
9-Nov-13

11-Dec-13
B

9-Jan-14

13-Sep-13

6-Nov-13

7-Dec-13

6-Feb-14

C
27-Nov-13

21-Nov-13

20-Dec-13

27-Nov-13

13-Sep-13

24-Oct-13

27-Nov-13

13-Sep-13

24-Oct-13

A
LNTP

11-Dec-13

12-Feb-14

E
27-Nov-13

11-Nov-13

9-Jan-14

LNTP

6-Feb-14

E
27-Nov-13

8-Jan-14

LNTP

10-Feb-14

9-Jan-14

LNTP

9-Jan-14

C
27-Nov-13

LNTP

24-Oct-13

E
LNTP

B
LNTP

R2SUB_A_DT R2APP_A_DT

11-Dec-13

LNTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

LNTP

LNTP

FAPP
CAT

2X660 MW IB VALLEY TPS

C
C

E
9-Jan-14

10-Feb-14

11-Nov-13

20-Jan-14

11-Nov-13

11-Dec-13

C
27-Nov-13

20-Sep-13

18-Feb-14

27-Nov-13

20-Sep-13

13-Nov-13

148 OF 276

B
C

C
C

24-Dec-13
C

6-Mar-14
24-Dec-13

10-Feb-14

6-Mar-14

26-Jan-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

COMP_S

COMP_A

B
A

26-Feb-14

15-Mar-14

B
A
B
C
C
A
A
C
B
B
A
A
A
A
B
B

B
B

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

27-Nov-13

20-Sep-13

11-Dec-13

27-Nov-13

20-Sep-13

11-Dec-13

27-Nov-13

20-Sep-13

11-Dec-13

27-Nov-13

20-Sep-13

6-Nov-13

27-Nov-13

20-Sep-13

11-Nov-13

27-Nov-13

20-Sep-13

18-Feb-14

27-Nov-13

20-Sep-13

18-Feb-14

27-Nov-13

11-Oct-13

6-Nov-13

27-Nov-13

9-Nov-13

9-Jan-14

27-Nov-13

21-Nov-13

20-Jan-14

27-Nov-13
27-Nov-13

13-Sep-13
13-Sep-13

20-Jan-14
20-Jan-14

27-Nov-13

19-Sep-13

7-Nov-13

27-Nov-13

19-Sep-13

7-Nov-13

27-Nov-13

17-Sep-13

1-Oct-13

27-Nov-13

17-Sep-13

1-Oct-13

24-Feb-14

15-Mar-14

27-Nov-13

19-Sep-13

18-Dec-13

24-Feb-14

15-Mar-14

27-Nov-13
27-Nov-13

19-Sep-13
19-Sep-13

16-Nov-13
18-Dec-13

A
B

MASTER DRAWING LIST

24-Feb-14

15-Mar-14

27-Nov-13

19-Sep-13

16-Nov-13

28-Feb-14

16-Mar-14

27-Nov-13
27-Nov-13

25-Sep-13
31-Oct-13

1-Nov-13
20-Dec-13

149 OF 276

FAPP
CAT
C
C
B
C
C
C
C
C
B
C
C
C
C
C
C
C
B
C
B
C
C
C

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

24-Dec-13

10-Feb-14

28-Feb-14

15-Mar-14

24-Dec-13

10-Feb-14

24-Dec-13

10-Feb-14

26-Feb-14

15-Mar-14

21-Dec-13

26-Jan-14

13-Feb-14

13-Mar-14

7-Dec-13

18-Feb-14

B
A
B
B
B

6-Mar-14

6-Mar-14
6-Mar-14
27-Dec-13

12-Feb-14

15-Jan-14

13-Feb-14

13-Feb-14

13-Mar-14

31-Jan-14
31-Jan-14

19-Feb-14
19-Feb-14

7-Dec-13

9-Jan-14

7-Dec-13

9-Jan-14

31-Oct-13

6-Nov-13

31-Oct-13

6-Nov-13

24-Dec-13

15-Jan-14

24-Dec-13
10-Jan-14

31-Jan-14
12-Feb-14

8-Jan-14

13-Feb-14

11-Oct-13
15-Jan-14

24-Dec-13
19-Feb-14

A
A
C
B
B
A
A
B
B

7-Dec-13

24-Dec-13

7-Dec-13

24-Dec-13

20-Jan-14

13-Feb-14

B
B
A
B
B
B

26-Feb-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER
DRAWING
LIST
FSUB_S_DT
FSUB_A_DT
FAPP_A_DT
FAPP
R1SUB_A_DT
CAT

LNTP
LNTP

B
C

LNTP
LNTP

LNTP
LNTP

27-Nov-13

31-Oct-13

20-Dec-13

27-Nov-13

23-Nov-13

24-Dec-13

27-Nov-13
27-Nov-13

25-Sep-13
25-Sep-13

1-Nov-13
20-Dec-13

27-Nov-13
27-Dec-13

9-Nov-13
13-Sep-13

19-Dec-13
11-Dec-13

B
LNTP

27-Dec-13

7-Dec-13

7-Dec-13

27-Dec-13

21-Nov-13

20-Jan-14

27-Dec-13

21-Nov-13

9-Jan-14

LNTP

13-Sep-13

24-Oct-13
C

27-Jan-14

10-Jan-14

15-Feb-14

27-Jan-14

24-Jan-14

27-Feb-14

27-Nov-13

21-Nov-13

9-Jan-14

27-Nov-13

21-Nov-13

9-Jan-14

B
C

NTP
0
NTP
0
LNTP
LNTP
NTP

E
E

11-Oct-13
26-Feb-14

31-Jan-14
15-Mar-14

4-Jan-14
1-Jan-14

27-Jan-14
5-Feb-14

B
18-Feb-14
15-Feb-14

21-Feb-14

3-Feb-14

11-Mar-14

31-Jan-14

13-Feb-14

9-Nov-13

5-Dec-13

E
27-Dec-13

15-Mar-14

E
LNTP

26-Feb-14

3-Jan-14

E
LNTP

16-Mar-14

C
27-Dec-13

LNTP

28-Feb-14

R2SUB_A_DT R2APP_A_DT

5-Feb-14

A
LNTP

R1APP_A_DT R1APP
CAT

C
LNTP

2X660 MW IB VALLEY TPS

150 OF 276

E
E

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0

151 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
0
NTP
NTP
NTP
NTP

0
0
0
0

NTP
0
NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0
0
0

152 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

9-Nov-13

9-Nov-13

30-Nov-13

19-Nov-13

19-Nov-13

31-Dec-13

19-Nov-13

19-Nov-13

31-Dec-13

28-Feb-14

28-Feb-14

28-Feb-14

28-Feb-14

28-Feb-14

28-Feb-14

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

0
0
0

NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
A
0
0
0
C
C
0
0
0
0
0
0
0

153 OF 276

C
C

15-Jan-14

28-Feb-14
28-Feb-14

26-Jan-14

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

MASTER DRAWING LIST

COMP_S

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Feb-14

7-Mar-14

4-Jan-14

4-Jan-14

15-Jan-14

6-Mar-14

6-Mar-14

13-Mar-14

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
C
C

NTP
NTP
NTP
NTP
NTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

NTP

NTP

FAPP
CAT

13-Mar-14
15-Mar-14

0
B
0
B
0
C

1-Jan-14

1-Jan-14

11-Feb-14

6-Mar-14

4-Jan-14

4-Jan-14

24-Jan-14

28-Feb-14

9-Nov-13

9-Nov-13

26-Feb-14

154 OF 276

2X660 MW IB VALLEY TPS


R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

18-Nov-13

9-Nov-13

27-Nov-13

NTP
NTP

NTP
NTP
LNTP

0
0

LNTP
NTP
NTP
NTP
NTP

B
B
B
0

5-Dec-14
16-Dec-14
15-Dec-13

9-Nov-13

12-Dec-13

20-Dec-13

9-Nov-13

12-Dec-13

15-Dec-13

9-Nov-13

12-Dec-13

0
0
0

NTP

21-May-14
5-Mar-15

NTP

NTP

3-Jan-14

5-Mar-14

NTP

21-Dec-13
C

NTP

NTP

R2SUB_A_DT R2APP_A_DT

0
A

LNTP

R1SUB_A_DT R1APP_A_DT R1APP


CAT

LNTP

NTP

FAPP
CAT

2X660 MW IB VALLEY TPS

0
0
0
0

155 OF 276

C
B
C

24-Dec-13

31-Jan-14

24-Dec-13

31-Jan-14

24-Dec-13

31-Jan-14

B
B
B

28-Feb-14
28-Feb-14
28-Feb-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
NTP

0
0

NTP
0
NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0
0
0
0
0
0
0
0

156 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0
0
0
0
0
0
0
0
0

NTP
0
NTP
0
NTP
0
NTP
0

157 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0
0
0
0
0
0
0

158 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

NTP
0
NTP
0
NTP
0

159 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
0
NTP
0
NTP
0
NTP

NTP
0
NTP
0
NTP
NTP

0
0

NTP
0
NTP
0
NTP
NTP

0
0

NTP
0
NTP
NTP

0
0

160 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0

NTP
0
NTP
NTP
NTP

0
0
0

NTP
0
NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0

161 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0
0
0
0

NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0
0
0
0

162 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0
0
0
0
0

NTP
0
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0

NTP
0
NTP
0
NTP

163 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

164 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

8/26/2013
27-Nov-13

26-Aug-13
12-Nov-13

24-Sep-13
20-Dec-13

27-Nov-13
27-Nov-13

12-Nov-13
12-Nov-13

20-Dec-13
20-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13

12-Nov-13

24-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13

12-Nov-13

20-Dec-13

27-Nov-13
27-Nov-13

12-Nov-13
13-Nov-13

20-Dec-13
26-Dec-13

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

0
0
0

NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0

LNTP
LNTP

LNTP
LNTP

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

A
A
A
A
A
A
A

165 OF 276

10-Oct-13
4-Jan-14

4-Nov-13
27-Jan-14

4-Jan-14

27-Jan-14

4-Jan-14

27-Jan-14

A
A

A
A
A
A
A
B

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP

FCAT

LNTP
LNTP
LNTP

E
A

LNTP
LNTP

LNTP
LNTP
LNTP
LNTP
LNTP

A
E
C
E

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

E
E
E
E
0

LNTP
LNTP
LNTP
LNTP
NTP
LNTP
NTP
NTP
LNTP
NTP

E
A
B
A
C

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

27-Nov-13

13-Nov-13

31-Dec-13

27-Nov-13
27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13
13-Nov-13

26-Dec-13
26-Dec-13
26-Dec-13

E
B

27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13

26-Dec-13
31-Dec-13

27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13

13-Nov-13
13-Nov-13
21-Nov-13
26-Nov-13
26-Nov-13

31-Dec-13
27-Jan-14
30-Nov-13
3-Jan-14
3-Jan-14

B
B
B
E

27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13
27-Nov-13

26-Nov-13
26-Nov-13
26-Nov-13
26-Nov-13
26-Nov-13
26-Nov-13

3-Jan-14
3-Jan-14
3-Jan-14
3-Jan-14

E
E
E
E

27-Jan-14

13-Jan-14

13-Feb-14

27-Jan-14

22-Jan-14

13-Feb-14

26-Aug-13
15-Jan-14

26-Aug-13
20-Jan-14

24-Sep-13
7-Feb-14

27-Sep-13

25-Sep-13

24-Dec-13

15-Jan-14

20-Jan-14

7-Feb-14

3-Jan-14

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

E
4-Jan-14

27-Jan-14

4-Jan-14
31-Jan-14
4-Jan-14

27-Jan-14
11-Feb-14
28-Jan-14

A
E
C

24-Feb-14

3-Mar-14

24-Feb-14

3-Mar-14

10-Oct-13
15-Mar-14

4-Nov-13

E
B
B
C
C

0
B

0
0
B
0

166 OF 276

2X660 MW IB VALLEY TPS

15-Mar-14

A
B
A

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
LNTP
LNTP
LNTP
NTP
NTP
NTP
LNTP
NTP
LNTP
LNTP
NTP
LNTP
LNTP
NTP
NTP
NTP
NTP
LNTP
LNTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

7-Feb-14

15-Jan-14

20-Jan-14

8-Feb-14

15-Jan-14

20-Jan-14

15-Mar-14

27-Sep-13

25-Sep-13

19-Feb-14

FAPP
CAT

R1SUB_A_DT R1APP_A_DT R1APP


CAT

0
B
B
B

B
B
B

15-Mar-14
15-Mar-14
15-Mar-14

0
0
0
C

15-Mar-14

0
B
B

B
B

15-Mar-14
15-Mar-14

0
C
B

C
B

0
0
0
0
C
B
0

167 OF 276

C
B

2X660 MW IB VALLEY TPS

15-Mar-14
15-Mar-14

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP

FCAT

0
E
E

NTP
NTP
LNTP
NTP
LNTP
LNTP
NTP
LNTP
LNTP
NTP
NTP
NTP

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

15-Jan-14

20-Jan-14

15-Mar-14

15-Jan-14
15-Jan-14

20-Jan-14
20-Jan-14

15-Mar-14
15-Mar-14

E
E

15-Jan-14

20-Jan-14

15-Mar-14

15-Jan-14

20-Jan-14

15-Mar-14

15-Jan-14
15-Jan-14

20-Jan-14
20-Jan-14

15-Mar-14
15-Mar-14

E
E

15-Jan-14

20-Jan-14

15-Mar-14

27-Sep-13

25-Sep-13

19-Feb-14

NTP
LNTP
LNTP
NTP

NTP

FSUB_S_DT

NTP
NTP

COMP_A

LNTP
NTP

LNTP

COMP_S

MASTER DRAWING LIST

0
C

0
0
0
0
0
E
0
E
E
0
A
B
0
0
0

168 OF 276

A
B

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
LNTP

FCAT

E
E

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Jan-14

20-Jan-14

15-Mar-14

15-Jan-14

20-Jan-14

15-Mar-14

26-Aug-13

26-Aug-13

24-Sep-13

26-Sep-13

20-Sep-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Oct-13

24-Oct-13

6-Nov-13

26-Nov-13

21-Nov-13

9-Jan-14

26-Nov-13

21-Nov-13

27-Jan-14

26-Nov-13
26-Nov-13

21-Nov-13
21-Nov-13

27-Jan-14
15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

25-Nov-13

11-Feb-14

21-Nov-13

11-Feb-14

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

E
E

0
A
C
E
E
A
E
B
B
E
E
B
0
0
0
0
0
0
B

C
C

C
C
E
B
B
E
E
B

26-Feb-14
26-Feb-14
26-Feb-14
26-Jul-14
26-Jan-16

169 OF 276

4-Nov-13

8-Jan-14

26-Feb-14

26-Nov-13

10-Oct-13

7-Dec-13

11-Feb-14

7-Dec-13

11-Feb-14

E
A

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

After order pla


After order pla
LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
After order pla

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Sep-13

20-Sep-13

15-Jan-14

26-Sep-13

20-Sep-13

15-Jan-14

26-Oct-13

24-Oct-13

1-Nov-13

26-Oct-13

24-Oct-13

1-Nov-13

26-Nov-13

21-Nov-13

FAPP
CAT

0
0
E
E
E
E
0
0
0
0
0
0
0
0
0
0
0
0
0

26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Mar-14
26-Jul-14
26-Jul-14
26-Jan-16
26-Jan-16

170 OF 276

E
E
E
E

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

After order pla


NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
After order pla
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Sep-13
26-Sep-13

25-Sep-13
25-Sep-13

8-Jan-14
1-Nov-13

26-Oct-13

24-Oct-13

1-Nov-13

26-Oct-13

24-Oct-13

1-Nov-13

26-Nov-13

21-Nov-13

19-Dec-13

30-Nov-13

21-Nov-13

5-Feb-14

26-Sep-13
26-Oct-13

25-Sep-13
24-Oct-13

31-Dec-13
8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Oct-13

24-Oct-13

8-Jan-14

26-Nov-13

21-Nov-13

26-Nov-13

21-Nov-13

26-Nov-13

21-Nov-13

FAPP
CAT

0
0
0
B
E
E
E
E
0
0

26-Jul-14
26-Jul-14
B
E
E
E
E

26-Jan-16
26-Jan-16

0
B
B
E
E
E
E
E
0
0
0

171 OF 276

B
B
E
E
E
E
E

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

0
0
E
E
E
E
E

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Nov-13

21-Nov-13

26-Nov-13

21-Nov-13

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

31-Jan-14

26-Nov-13

21-Nov-13

31-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

E
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

E
E
E
E
E
B

NTP

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

31-Jan-14

26-Nov-13

21-Nov-13

31-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

15-Jan-14

26-Nov-13

21-Nov-13

31-Dec-13

26-Feb-14

NTP
NTP
NTP

0
0
0
0

E
E
E
E
E
E

0
NTP

FAPP
CAT

26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14

172 OF 276

E
E
E
E
E
B

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Feb-14
26-Mar-14
26-Jul-14
26-Jul-14
26-Jul-14
26-Jul-14
26-Jul-14
26-Jul-14
26-Jul-14
26-Jul-14

173 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
After order pla
2 mnths before
2 mnths before
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

0
0
0

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Sep-13

20-Sep-13

1-Nov-13

26-Oct-13

24-Oct-13

26-Oct-13

24-Oct-13

9-Jan-14

26-Oct-13

24-Oct-13

27-Nov-13

26-Oct-13

24-Oct-13

27-Nov-13

26-Oct-13

24-Oct-13

27-Nov-13

26-Oct-13

24-Oct-13

27-Dec-13

26-Nov-13

21-Nov-13

3-Jan-14

26-Dec-13

19-Dec-13

24-Jan-14

26-Dec-13

19-Dec-13

26-Dec-13

19-Dec-13

13-Feb-14

26-Dec-13

19-Dec-13

24-Jan-14

26-Dec-13

19-Dec-13

24-Jan-14

26-Jan-14

15-Jan-14

11-Feb-14

FAPP
CAT

26-Jul-14
28-Feb-14
28-Feb-14

0
0
0
E
0
E
C
C
C
E
E
B
0
C
B
E
E

174 OF 276

E
C
C
C
E
E
B

C
B
E
E

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP

FCAT

E
E

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

E
LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

E
E
E
E
E
0
0
0
0
0
0
0
0
0
0
0
0

FAPP
CAT
E
E
E

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Jan-14

15-Jan-14

11-Feb-14

26-Feb-14
26-Feb-14
26-Feb-14
26-Mar-14
26-Mar-14
26-Mar-14
26-Mar-14
26-Mar-14
26-Mar-14
26-Mar-14
26-May-14
26-Jan-16

175 OF 276

E
E
E
E
E

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
LNTP
NTP
NTP
NTP
NTP
NTP
LNTP
NTP
NTP
NTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

0
A

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Aug-13

26-Aug-13

24-Sep-13

27-Sep-13

20-Sep-13

31-Dec-13

21-Nov-13

27-Nov-13

25-Sep-13

6-Nov-13

19-Dec-13

15-Jan-14

R1SUB_A_DT R1APP_A_DT R1APP


CAT

26-Jan-16
C

10-Oct-13

4-Nov-13

8-Jan-14

15-Jan-14

13-Feb-14

27-Feb-14

0
0
0
0
0
E
0
A
0
C
0
0

30-Mar-15
15-Dec-13

30-Aug-15
27-Sep-13

30-Mar-15
30-Aug-15

0
B

19-Dec-13

0
0

NTP
0
NTP

FAPP
CAT

2X660 MW IB VALLEY TPS

176 OF 276

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
LNTP
NTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

27-Oct-13

25-Oct-13

31-Oct-13

13-Sep-13

12-Dec-13

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

19-Nov-13

7-Mar-14

0
0
A
0
C
0
0
0
0
0
0
0
0
0
0
0
0

30-Apr-14
27-Sep-13
30-Apr-14
30-Jun-14
30-Jun-14
1-Apr-14
30-Mar-15
30-Aug-15
30-Apr-15
30-Jun-15
30-Apr-15
30-Jun-15
30-Jun-15
30-Sep-15

0
0
0

177 OF 276

20-Jan-14

27-Dec-13

12-Mar-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

0
0
0

NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0
0
0
0

NTP
0
NTP

NTP
0
NTP

178 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
NTP
NTP
NTP
NTP
NTP
NTP

0
0
0
0
0
0
0

NTP
0
NTP
NTP

0
0

NTP
0
NTP

NTP
0
NTP
0
NTP
0
NTP
0

179 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0

180 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Aug-13

26-Aug-13

24-Sep-13

15-Sep-13

13-Sep-13

30-Nov-13

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP
0
NTP

31-Dec-14
0

NTP
0
NTP
LNTP
LNTP

0
A
C

181 OF 276

C
C

10-Oct-13

4-Nov-13

10-Jan-14

13-Feb-14

A
C

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

C
0
0
0
A
A
A
B
A
B
B
B
B
C
C
C
C
C
C
C
C

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Sep-13
15-Sep-13

13-Sep-13
13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

7-Dec-13

15-Sep-13

13-Sep-13

13-Nov-13

15-Sep-13

13-Sep-13

13-Nov-13

15-Sep-13

13-Sep-13

13-Nov-13

15-Sep-13

18-Sep-13

1-Mar-14

15-Sep-13

18-Sep-13

1-Mar-14

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

31-Oct-13

24-Oct-13

30-Nov-13

182 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

C
C
C
C
B
C
C
C
B
C
C
C
C
C
C
C
C

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

13-Jan-14

7-Feb-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

16-Dec-13

10-Feb-14

11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14
11-Mar-14

A
A
A
B
A
B
B
B

12-Feb-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

B
B
E
E
E
E
E
E
E
A
B
E
E
E
E
E
C
E
E
A

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

6-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

4-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

183 OF 276

FAPP
CAT
C
C
C
B

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

26-Nov-13

16-Jan-14

15-Feb-14

13-Mar-14

26-Nov-13

16-Jan-14

B
B
E
E

E
E
E
E
E
A
C
C

B
E

E
E
E
E
C

26-Nov-13

E
E
C

26-Nov-13

16-Jan-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

B
E
E
E
E
E
E
E
E
E
C
E
E
E
E

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

B
C
B
B
B
B
B

NTP
NTP

B
C

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

16-Jan-14

15-Sep-13

19-Sep-13

11-Nov-13

15-Sep-13

19-Sep-13

11-Nov-13

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

15-Dec-13

21-Dec-13

16-Jan-14

31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14
22-Jan-14

10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14
10-Feb-14

B
C
B
B
B
B
B

15-Feb-14
15-Feb-14

9-Jan-14
9-Jan-14

31-Jan-14
1-Feb-14

B
C

184 OF 276

FAPP
CAT
C
C

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

26-Nov-13

16-Jan-14

15-Feb-14

26-Nov-13

16-Jan-14

E
E
E
E
E
E
E
E
C
E
E
E
E

2X660 MW IB VALLEY TPS

5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14
5-Mar-14

B
E

13-Mar-14

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

E
E
E
E
E
E
E
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
15-Feb-14
28-Feb-14

9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14
9-Jan-14

2-Feb-14
3-Feb-14
4-Feb-14
5-Feb-14
6-Feb-14
7-Feb-14
8-Feb-14

28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
31-Mar-14
31-Mar-14
31-Mar-14

185 OF 276

FAPP
CAT
E
E
E
E
E
E
E

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP

FCAT

0
0
0
0

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

C
C
E
E
E
E
E
C
E
C
E
C
C
C

NTP
NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

C
B
B
B
E
E
E
E
E
E
C
E
E
0
C
C
E

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14
31-Jan-14

19-Feb-14
19-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
28-Feb-14
19-Feb-14
19-Feb-14
28-Feb-14
19-Feb-14
19-Feb-14
28-Feb-14
28-Feb-14
19-Feb-14
28-Feb-14

C
C
E
E
E
E
E
C
E
C
E
C
C
C

31-Jan-14
31-Jan-14
31-Jan-14
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13
30-Sep-13

31-Jan-14
31-Jan-14
31-Jan-14
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
13-Sep-13
19-Sep-13
19-Sep-13
21-Sep-13

28-Feb-14
28-Feb-14
28-Feb-14
10/25//13
10/25//13
26-Feb-14
10/25//13
10/25//13
10/25//13
22-Feb-14
10/25//13
22-Feb-14
10/25//13

C
B
B
C
C
E
C
C
C
E
C
E
C

11-Nov-13
11-Nov-13
10/25//13

C
C
C

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

31-Mar-14
31-Mar-14
31-Mar-14
31-Mar-14

186 OF 276

11-Mar-14
11-Mar-14

B
11-Mar-14
11-Mar-14
6-Feb-14
6-Feb-14

21-Feb-14
21-Feb-14

B
E

6-Feb-14
6-Feb-14
6-Feb-14

21-Feb-14
21-Feb-14
21-Feb-14

E
E
E

6-Feb-14

21-Feb-14

6-Feb-14

21-Feb-14

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

FCAT

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

30-Sep-13

24-Oct-13

30-Sep-13

19-Sep-13

FAPP_A_DT

31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14

187 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

0
0
0
0
0
0
0
0
0
0
B
B
C
C
A
A
C
C
0
B
C
B
0
0
0

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

FAPP
CAT

15-Sep-13

21-Sep-13

24-Dec-13

15-Sep-13

21-Sep-13

24-Dec-13

15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13
15-Sep-13

21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
25-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13
21-Sep-13

12-Dec-13
12-Dec-13
12-Dec-13
12-Dec-13
12-Dec-13
12-Dec-13

C
C
C
C
C
C

19-Feb-14
19-Feb-14
19-Feb-14

B
C
B

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14
31-May-14

188 OF 276

B
B

24-Jan-14
24-Jan-14

5-Feb-14
5-Feb-14

A
A

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
NTP

FCAT

0
0
B
0
0
0
A
B
E

NTP
NTP

NTP
NTP
LNTP

B
B

LNTP
LNTP
NTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP
NTP

0
0
B
0
B
B
E
E
0
0
B

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

21-Sep-13

15-Sep-13

19-Sep-13

15-Sep-13

19-Sep-13

30-Sep-13

24-Sep-13

26-Aug-13
25-Dec-13

26-Aug-13
26-Dec-13

24-Sep-13
11-Feb-14

25-Jan-14

24-Jan-14

27-Feb-14

25-Feb-14
25-Feb-14

10-Feb-14
10-Feb-14

28-Feb-14
28-Feb-14

25-Feb-14
25-Feb-14
10-Jan-14

10-Feb-14
10-Feb-14
27-Jan-14

28-Feb-14
28-Feb-14

B
B

25-Jan-14

27-Jan-14

25-Dec-13
15-Mar-14

26-Dec-13

11-Feb-14

25-Dec-13

26-Dec-13

11-Feb-14

25-Dec-13

26-Dec-13

11-Feb-14

25-Jan-14

24-Jan-14

27-Feb-14

25-Jan-14

24-Jan-14

27-Feb-14

10-Feb-14

28-Feb-14

24-Dec-13

FAPP
CAT

189 OF 276

R1SUB_A_DT R1APP_A_DT R1APP


CAT

C
B
E

B
B
E
E

15-Nov-14
15-Nov-14
10-Feb-14

2X660 MW IB VALLEY TPS

10-Oct-13

4-Nov-13

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

NTP
LNTP

LNTP
LNTP

LNTP
LNTP

LNTP
LNTP

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

10-Feb-14
26-Aug-13

10-Feb-14
26-Aug-13

28-Feb-14
24-Sep-13

30-Oct-13
30-Oct-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

30-Oct-13
30-Oct-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

30-Oct-13
30-Oct-13

13-Sep-13
13-Sep-13

19-Dec-13
1-Nov-13

30-Oct-13

13-Sep-13

19-Dec-13

B
LNTP
LNTP
LNTP
LNTP
64 weeks from
NTP order

E
B
B
E

56 weeks from
NTP order

56 weeks from
NTP order

56 weeks from
NTP order

56 weeks from
NTP order

56 weeks from
NTP order

R1SUB_A_DT R1APP_A_DT R1APP


CAT

B
C

10-Oct-13

4-Nov-13

11-Mar-14
3-Mar-14

7-Mar-14

11-Mar-14
3-Mar-14

7-Mar-14

11-Mar-14
3-Mar-14

7-Mar-14

11-Mar-14
B

30-Oct-13
30-Oct-13
30-Oct-13
20-Oct-13

13-Sep-13
27-Oct-13
27-Oct-13
24-Oct-13

1-Nov-13
26-Feb-14
26-Feb-14
1-Mar-14

64 weeks from
NTP order

FAPP
CAT

2X660 MW IB VALLEY TPS

190 OF 276

B
B
B
E

3-Mar-14
11-Mar-14
11-Mar-14

7-Mar-14

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

56 weeks from
NTP order
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

FCAT

B
B
C
E
B
E
B
E

LNTP
56 weeks from
NTP order

LNTP
LNTP
LNTP
LNTP
LNTP

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

25-Nov-13

19-Nov-13

31-Dec-13

25-Nov-13
25-Nov-13

25-Nov-13
25-Nov-13

24-Jan-14
24-Jan-14

25-Nov-13

25-Nov-13

24-Jan-14

25-Nov-13

25-Nov-13

31-Jan-14

25-Nov-13

25-Nov-13

24-Jan-14

25-Nov-13
25-Nov-13
31-Dec-14

25-Nov-13
25-Nov-13
25-Nov-13

31-Jan-14
24-Jan-14
24-Jan-14

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

LNTP
LNTP
48 weeks from
NTP order

56 weeks from
NTP order

COMP_S

MASTER DRAWING LIST

B
B
C
E
B
E
B
E
B

25-Nov-13

25-Nov-13

24-Jan-14

25-Sep-13

21-Sep-13

24-Oct-13

25-Oct-13

24-Oct-13

5-Dec-13

25-Nov-13
25-Nov-13

19-Nov-13
19-Nov-13

24-Dec-13
24-Dec-13

25-Nov-13

19-Nov-13

24-Dec-13

0
B
E
A
A
A

24 weeks from
NTP

24 weeks from
NTP

QA/CM to
decide.

191 OF 276

7-Dec-13

27-Jan-14

10-Jan-14
10-Jan-14

13-Feb-14
13-Feb-14

10-Jan-14

13-Feb-14

E
B
B
B

3-Mar-14

7-Mar-14

3-Mar-14

7-Mar-14

A
B

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

QA/CM to
decide.

24 weeks from
NTP

24 weeks from
NTP

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

25-Nov-13

25-Nov-13

24-Dec-13

E
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

C
C
C
E
B
E
C
B
B
B
B
B
B
B
E
E
E
E
B

FAPP
CAT

21-Oct-13

25-Oct-13

22-Nov-13

7-Oct-13

24-Oct-13

27-Nov-13

21-Oct-13

25-Oct-13

22-Nov-13

21-Oct-13
21-Sep-13
7-Oct-13
7-Oct-13
21-Dec-13
21-Dec-13

27-Oct-13
21-Sep-13
24-Oct-13
24-Oct-13
21-Dec-13
21-Dec-13

27-Nov-13
8-Jan-14
27-Nov-13
27-Nov-13
7-Feb-14
7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Dec-13

21-Dec-13

7-Feb-14

21-Oct-13

27-Oct-13

27-Jan-14

7-Oct-13

27-Oct-13

11-Nov-13

7-Oct-13

24-Oct-13

11-Nov-13

7-Oct-13

24-Oct-13

11-Nov-13

7-Oct-13

24-Oct-13

11-Nov-13

21-Dec-13

21-Dec-13

24-Jan-14

192 OF 276

R1SUB_A_DT R1APP_A_DT R1APP


CAT

10-Jan-14
B
C
C
C
E
B
E
C
B
B
B
B
B
B
B
E
E
E
E
B

2X660 MW IB VALLEY TPS

13-Feb-14
E

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP

FCAT

B
E

LNTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

21-Dec-13
21-Oct-13

21-Dec-13
27-Oct-13

24-Jan-14
27-Nov-13

21-Oct-13

27-Oct-13

27-Nov-13

E
LNTP

21-Oct-13

LNTP
LNTP
LNTP
LNTP
LNTP
NTP
NTP

E
E
E
E
B
B
C
0
0

LNTP

27-Oct-13

E
21-Oct-13
7-Oct-13

27-Oct-13
24-Oct-13

27-Nov-13
13-Feb-14

21-Oct-13

27-Oct-13

13-Feb-14

21-Oct-13

27-Oct-13

13-Feb-14

21-Dec-13

21-Dec-13

15-Feb-14

21-Dec-13

21-Dec-13

15-Feb-14

21-Jan-14
21-May-14

20-Jan-14

18-Feb-14

25-Oct-13

6-Nov-13

LNTP
LNTP

E
C

LNTP
LNTP

LNTP
LNTP

E
E
E
E
B
B
C

21-May-14
21-Oct-13

27-Nov-13

E
LNTP

E
LNTP
LNTP

FAPP
CAT

E
7-Oct-13

24-Oct-13

14-Mar-14

21-Oct-13

27-Oct-13

6-Nov-13

21-Dec-13

21-Dec-13

24-Jan-14

21-Dec-13
21-Dec-13

21-Dec-13
21-Dec-13

24-Jan-14
24-Jan-14

21-Jan-14
21-Oct-13

20-Jan-14
27-Oct-13

18-Feb-14
6-Nov-13

193 OF 276

C
E
C

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP
LNTP
NTP

FCAT

E
E
0

56 weeks from
NTP order

56 weeks from
NTP order

56 weeks from
NTP order

56 weeks from
NTP order

COMP_S

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

21-Jan-14
21-Oct-13

21-Dec-13
27-Oct-13

24-Jan-14
6-Nov-13

20-Jan-14

11-Feb-14

21-Jan-14

LNTP

B
21-Jan-14

20-Jan-14

11-Feb-14

LNTP
NTP
LNTP

B
E
B
0
B

LNTP

B
28-Oct-13

2-Nov-13

27-Jan-14

28-Oct-13

2-Nov-13

27-Jan-14

28-Oct-13

2-Nov-13

27-Jan-14

28-Dec-13

21-Dec-13

24-Jan-14

21-Oct-13

25-Nov-13

27-Jan-14

LNTP

E
B

B
B

21-Oct-13

2-Nov-13

27-Nov-13

E
E

21-May-14

LNTP

21-May-14

LNTP

LNTP

LNTP

FAPP
CAT

E
21-Oct-13

2-Nov-13

27-Nov-13

194 OF 276

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

MASTER DRAWING LIST

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

LNTP

FCAT

LNTP

COMP_S

COMP_A

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

21-Oct-13

2-Nov-13

27-Nov-13

21-Oct-13

2-Nov-13

6-Nov-13

E
4 weeks from
NTP
4 weeks from
the date of
receipt of
HBDs and
design
pressure

0
B
B
B
B
C

8 weeks from
the date of
receipt of
HBDs and
design
pressure

B
B
B
B
B
B

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

FAPP
CAT
E
E

I
19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

15-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

27-Jan-14

19-Nov-13

19-Nov-13

28-Jan-14

19-Nov-13

19-Nov-13

28-Jan-14

19-Nov-13

19-Nov-13

28-Jan-14

19-Nov-13

19-Nov-13

28-Jan-14

21-Dec-13

21-Dec-13

19-Feb-14

19-Nov-13

19-Nov-13

15-Jan-14

195 OF 276

B
B
B
B
C
B
B
B
B
B
B
B

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

4 weeks from
NTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

NTP

LNTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

19-Nov-13

19-Nov-13

15-Jan-14

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

23-Aug-13

26-Aug-13

24-Sep-13

15-Jan-14

24-Jan-14

19-Feb-14

10-Jan-14

24-Jan-14

19-Feb-14

15-Jan-14

24-Jan-14

19-Feb-14

15-Jan-14

24-Jan-14

15-Dec-13

26-Dec-13

20-Jan-14

24-Jan-14

20-Jan-14

24-Jan-14

20-Dec-13

26-Dec-13

15-Jan-14

24-Jan-14

19-Feb-14

19-Feb-14

19-Feb-14

28-Jan-14
25-Jan-14

24-Jan-14

15-Feb-14

196 OF 276

C
C
C
C

10-Oct-13
7-Mar-14
7-Mar-14
7-Mar-14

7-Mar-14

7-Mar-14

7-Mar-14

4-Nov-13

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

LNTP

NTP

NTP

LNTP

LNTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

15-Jan-14

24-Jan-14

19-Feb-14

20-Jan-14

24-Jan-14

19-Feb-14

25-Jan-14

25-Jan-14

19-Feb-14

1-Mar-14
1-Mar-14
1-Mar-14
1-Mar-14
1-Mar-14

30-Jan-14

1-Feb-14

NTP

NTP

7-Mar-14

15-Feb-14

28-Jan-14

R1SUB_A_DT R1APP_A_DT R1APP


CAT

28-Jan-14

1-Mar-14

NTP

FAPP
CAT

3-Feb-14

1-Feb-14

197 OF 276

C
C

2X660 MW IB VALLEY TPS

7-Mar-14
7-Mar-14

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

7-Feb-14
NTP

NTP

NTP

NTP

NTP

7-Feb-14

3-Feb-14

17-Feb-14

17-Feb-14

5-Feb-14
NTP

NTP

NTP

NTP

5-Feb-14

4-Feb-14

1-Feb-14

3-Feb-14
NTP

NTP

1-Feb-14

5-Feb-14
NTP

NTP

5-Feb-14

198 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

6-Feb-14
NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

7-Feb-14
13-Feb-14
14-Feb-14

17-Feb-14

17-Feb-14

19-Feb-14

25-Feb-14
25-Feb-14
25-Feb-14

25-Feb-14

25-Feb-14
25-Feb-14

NTP

0
28-Feb-14

NTP

199 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

5-Mar-14
NTP

5-Mar-14

NTP

11-Mar-14
NTP

12-Mar-14

NTP

15-Mar-14
NTP

0
15-Mar-14

NTP

18-Mar-14
NTP

200 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

25-Mar-14
NTP

28-Mar-14
NTP

0
31-Mar-14

NTP

28-Feb-14
NTP

0
8-Apr-14

NTP

12-Apr-14
NTP

NTP

NTP

NTP

NTP

NTP

14-Apr-14

15-Apr-14
15-Apr-14
15-Apr-14

15-Apr-14

201 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

18-Apr-14
18-Apr-14
18-Apr-14
18-Apr-14
19-Apr-14
19-Apr-14
19-Apr-14
22-Apr-14
22-Apr-14
22-Apr-14
24-Apr-14
25-Apr-14
26-Apr-14
28-Apr-14

28-Apr-14

1-May-14
2-May-14
2-May-14
3-May-14

202 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

4-May-14
6-May-14
7-May-14
7-May-14
7-May-14
7-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
12-May-14
12-May-14
12-May-14
16-May-14
16-May-14
16-May-14

203 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

19-May-14
NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

22-May-14

22-May-14
22-May-14
26-May-14
26-May-14
28-May-14
28-May-14
28-May-14
2-Jun-14
2-Jun-14
2-Jun-14
2-Jun-14
2-Jun-14
2-Jun-14
28-Apr-14
6-May-14

6-May-14

204 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

18-Apr-14
18-Apr-14
26-Apr-14
26-Apr-14
7-May-14
7-May-14
8-May-14
8-May-14
19-May-14
19-May-14
7-May-14
7-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14

205 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


Remarks

FCAT

NTP

NTP

NTP

NTP

NTP

NTP

COMP_S

COMP_A

MASTER DRAWING LIST


FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

26-Aug-13

24-Sep-13

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

8-May-14
8-May-14

8-May-14

LNTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

A
0
0
0
0
0
0
0
0
0
0
0
0

8-May-14
4-Jun-14
11-Jun-14
28-Aug-13
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15
6-Apr-15

206 OF 276

10-Oct-13

4-Nov-13

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

Remarks

NTP
NTP
NTP
NTP

FCAT

0
0
0
0

NTP

COMP_S

COMP_A

MASTER DRAWING LIST

FSUB_S_DT

FSUB_A_DT

FAPP_A_DT

6-Apr-15
6-Apr-15
6-Apr-15
4-May-15
4-May-15

0
NTP

NTP

4-May-15
4-May-15

0
NTP
NTP
NTP

0
0
0

6-Apr-15
4-May-15
4-Jan-16

207 OF 276

FAPP
CAT

2X660 MW IB VALLEY TPS

R1SUB_A_DT R1APP_A_DT R1APP


CAT

R2SUB_A_DT R2APP_A_DT

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT

LNTP
LNTP
LNTP
LNTP

APP
NSUB
APP
NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

MASTER DRAWING LIST

208 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP
LNTP
LNTP

APP
APP
APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP
LNTP
LNTP

APP
APP
NSUB

LNTP

APP

LNTP

APP

MASTER DRAWING LIST

209 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

SUB

NTP
NTP

NSUB
NSUB

NTP

APP

NTP

NSUB

NTP

NSUB

NTP
NTP

SUB
SUB

210 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

SUB

NTP

APP

NTP

APP

NTP

APP

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
NTP
NTP

APP
NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

211 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

NTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP
LNTP

SUB
APP

LNTP

APP

LNTP

NSUB

LNTP
LNTP

NSUB
SUB

MASTER DRAWING LIST

212 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

APP

LNTP

NSUB

LNTP

SUB

LNTP

SUB

E
A

LNTP
LNTP
LNTP

APP
APP
APP

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

APP
APP
APP
APP
APP
NSUB
NSUB

LNTP
LNTP
LNTP
LNTP

APP
APP
SUB
APP

LNTP
LNTP

SUB
SUB

LNTP
LNTP

SUB
APP

A
A
E

MASTER DRAWING LIST

213 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT

LNTP

APP

LNTP

APP

LNTP
LNTP
NTP
NTP

APP
APP
NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
LNTP

APP
SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

APP

MASTER DRAWING LIST

214 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
C

LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP
LNTP

NSUB
NSUB

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

215 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

C
C

LNTP
LNTP
LNTP

SUB
SUB
APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP
LNTP
LNTP

APP
APP
SUB

LNTP

SUB

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

MASTER DRAWING LIST

216 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

SUB

LNTP

APP

217 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
B

LNTP

NSUB

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP
LNTP

NSUB
NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP
LNTP

NSUB
APP

LNTP

NSUB

LNTP
LNTP

SUB
NSUB

218 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT

LNTP

NSUB

LNTP

NSUB

LNTP
LNTP

NSUB
NSUB

LNTP
LNTP

APP
SUB

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

APP

NTP

NSUB

MASTER DRAWING LIST

219 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

220 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

221 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
NTP
NTP
NTP
LNTP

APP
NSUB
NSUB
NSUB
SUB

LNTP

SUB

NTP

SUB

NTP

NSUB

NTP
NTP

NSUB
NSUB

NTP

SUB

NTP

SUB

NTP

NSUB

222 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP
NTP
NTP
NTP

NSUB
NSUB
NSUB
NSUB

NTP

NSUB

NTP
NTP
NTP
NTP
NTP
LNTP

NSUB
NSUB
NSUB
NSUB
NSUB
SUB

NTP

SUB

NTP

NSUB

LNTP
NTP
LNTP
NTP
LNTP

SUB
NSUB
SUB
NSUB
NSUB

MASTER DRAWING LIST

223 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

LNTP

APP

NTP

NSUB

NTP
NTP

NSUB
NSUB

NTP
NTP
LNTP

NSUB
NSUB
SUB

LNTP

SUB

LNTP
NTP
NTP

SUB
NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

224 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

225 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

226 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

227 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

228 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

229 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

230 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP
NTP

NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

231 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP
NTP

NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

232 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

233 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
LNTP

APP
APP

LNTP
LNTP

APP
APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP
LNTP

APP
APP

234 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

APP

LNTP
LNTP
LNTP

APP
APP
APP

LNTP
LNTP

APP
APP

LNTP
LNTP
LNTP
LNTP
LNTP

APP
APP
NSUB
APP
APP

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

APP
APP
APP
APP
SUB
APP

LNTP

APP

LNTP

NSUB

LNTP
LNTP

APP
SUB

NTP

NSUB

LNTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

SUB

NTP

NSUB

MASTER DRAWING LIST

235 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

SUB

NTP

NSUB

LNTP

SUB

LNTP

SUB

NTP

NSUB

LNTP

SUB

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP
NTP

NSUB
NSUB

MASTER DRAWING LIST

236 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
NTP

APP
NSUB

NTP
LNTP
LNTP
NTP

NSUB
APP
APP
NSUB

LNTP

NSUB

NTP
NTP

NSUB
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
NTP
LNTP
LNTP
NTP

APP
NSUB
APP
APP
NSUB

LNTP

APP

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

237 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

APP

LNTP

APP

NTP

NSUB

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP
LNTP

NSUB
APP

LNTP

APP

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

MASTER DRAWING LIST

238 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

239 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP
LNTP

NSUB
APP

LNTP

APP

LNTP

APP

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP
LNTP

NSUB
APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

SUB

240 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

241 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

242 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

SUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

243 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

244 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

NTP

NSUB

LNTP

APP

NTP

NSUB

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

245 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT

NTP

NSUB

NTP

NSUB

LNTP

APP

NTP

NSUB

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

246 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

247 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

248 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

249 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

NSUB

MASTER DRAWING LIST

250 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP
LNTP

NSUB
SUB

LNTP

SUB

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

MASTER DRAWING LIST

251 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
B

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

SUB

LNTP

APP

LNTP

APP

LNTP

APP

252 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
B

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

SUB
SUB
SUB
SUB
SUB
SUB
SUB
SUB

NTP
NTP

NSUB
NSUB

MASTER DRAWING LIST

253 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

APP
APP
APP
APP
APP
APP
APP
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

254 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP
NTP

NSUB
NSUB
APP
APP
APP
APP
APP
NSUB
APP
NSUB
APP
SUB
SUB
NSUB
NSUB

NTP
NTP
NTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

NSUB
SUB
SUB
NSUB
APP
APP
APP
APP
APP
APP
NSUB
APP
APP
SUB
NSUB
NSUB
APP

MASTER DRAWING LIST

255 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
LNTP

SUB

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

256 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

NSUB
NSUB
APP
APP
NSUB
NSUB
SUB
NSUB
NSUB
NSUB
SUB

LNTP

SUB

LNTP

SUB

257 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

SUB

LNTP

SUB

LNTP

NSUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP
LNTP

APP
NSUB

LNTP

APP

NTP
NTP

NSUB
NSUB

NTP
NTP
LNTP

NSUB
NSUB
SUB

LNTP

SUB

LNTP
NTP

NSUB
NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

NTP

NSUB

NTP
NTP

NSUB
NSUB

MASTER DRAWING LIST

258 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP
LNTP

NSUB
APP

LNTP
LNTP

SUB
APP

LNTP
LNTP

SUB
NSUB

LNTP
LNTP

SUB
APP

LNTP

SUB

LNTP
LNTP
LNTP
LNTP
NTP

APP
SUB
SUB
APP
NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

259 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

LNTP

NSUB

LNTP
LNTP

NSUB
NSUB

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP
LNTP
NTP

NSUB
APP
NSUB

LNTP
NTP

APP
NSUB

NTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP
LNTP

APP
APP

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

260 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP
LNTP
LNTP
LNTP
LNTP
LNTP

APP
NSUB
APP
NSUB
NSUB
NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

APP

LNTP

NSUB

MASTER DRAWING LIST

261 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP
LNTP

NSUB
APP

LNTP

APP

LNTP

APP

LNTP
LNTP

APP
APP

LNTP

APP

LNTP

APP

LNTP

NSUB

LNTP

NSUB

LNTP
NTP

NSUB
NSUB

NTP

NSUB

LNTP

APP

LNTP

NSUB

LNTP

APP

LNTP

NSUB

LNTP
LNTP

NSUB
NSUB

LNTP
LNTP

NSUB
APP

MASTER DRAWING LIST

262 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP
LNTP

APP
APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

NSUB

NTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

APP

LNTP

APP

MASTER DRAWING LIST

263 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

APP

LNTP

APP

NTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

NSUB

MASTER DRAWING LIST

264 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
LNTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

LNTP

SUB

NTP

NSUB

LNTP

SUB

NTP

NSUB

MASTER DRAWING LIST

265 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
LNTP

SUB

NTP

NSUB

NTP

NSUB

LNTP

SUB

LNTP

SUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

266 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

267 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

268 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

269 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1


R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

MASTER DRAWING LIST

270 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

271 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

272 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

273 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

274 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

LNTP

APP

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

275 OF 276

2X660 MW IB VALLEY TPS

DOC NO. PE-SC-391-BHELDRGLIST-P001 R1

MASTER DRAWING LIST

R2APP
CAT
NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

NTP

NSUB

276 OF 276

2X660 MW IB VALLEY TPS