Hinkley Point C Connection Project
Regulation 5(2)(o) of the Infrastructure Planning
(Applications: Prescribed Forms and Procedure)
Regulations 2009

Application Reference EN020001

May 2014

Dr

n
ai

k
ac
Tr

Site Map

Sl

Drain

n
i
Dra

n
Drai

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER


e
n
y
h
R
d
a
e
m
d
r
a
H

n
Drai

ai
n

Tr

ac
k

DESIGN DRAWINGS
n
i
ra
D

Dr

Pa

th

i
n

n
ai

Ch
Ra e d
i
lw da
ay r
V
W
a
al lle
k
y

(REGULATION 5 (2)(o))

Dr

n
i
a
r
D

k
c
a
r
T

r
a

n
i

SHEET 30 OF 70

n
i
a
r
D

e
n
y
h
R
d
a
e
m
d
r
a
H
5.5m

Dr

Dr
ai
n

n
ai

Pa

th

Tr ac k

NORTH SOMERSET COUNCIL


r

a
n
i
D
R

OV
E
W
AY

ck
Tra
Pond
Pond
6.1m

Trac
k

Resr

Drai
n

Pond

Resr

Drain

D
r

Pond

n
i
n
i
a
r
D

Ponds

Droveway Bridge

T
a

ETL

r
c

Bridge Farm

15.6m
Silo

Droveway
Farm
Pond

Pond

Pond

Pond

NY

The Oaks

Tr

17.2m
D

r
n
ai

Di
sma
ntl
ed

Pond

ack

Rai
lwa
y

ROA

Pond

Pond
Pond

Pond
West Leigh Farm
L
ET

Pond

M
E
A
D

L
A
N
E

Birchwood House
Birchwood House

NY
E
RO
AD

Dorvic

Mead Farm

w
do
Meaoft
Cr

be
om
e
Co gl
n
Di

Westleigh

Depot

d
ea
tm
es

Northfield

i
ta
ri
Mu

Farm

LA

d
el
i
tf
es

AD

Tennis

ME

t
hco
As

NE

Key
- NEW EQUIPMENT
- ELECTRIFIED FENCELINE
- CABLE

1
2
3
4
5
6
7
8
9
10
11

- SHUNT REACTOR
- SUPERGRID TRANSFORMER
- DUMP TANK FOR HYDROCARBON CONTAINMENT
- WATER TANK
- DIESEL GENERATOR
- TEMPORARY DIESEL GENERATOR
- CONTROL BUILDING
- AMENITY BUILDING
- WORKSHOP
- EARTH STORE
- LVAC

CB
CSE
CT
DC
ES
HIS
PI
SA
VT

CIRCUIT BREAKER
CABLE SEALING END
CURRENT TRANSFORMER
DISCONNECTOR
EARTH SWITCH
HIGHLY INTEGRATED SWITCHGEAR
POST INSULATOR
SURGE ARRESTOR
VOLTAGE TRANSFORMER

72000

ES
DC/ES
SA

Ent
r
ance

CB

Notes

Dr
yi
ng /ShowerRoom

Toi
l
et

chen /M ess
t
Ki

Di
sabl
ed

Ent
r
ance Lobby

Toi
l
et

M ai
n

PI

1.

ALL DIMENSIONS ARE IN MILLIMETRES UNLESS


OTHERWISE STATED.

2.

ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE


ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT
PROVIDED THAT THE SPECIFIED CLEARANCES ARE
MAINTAINED. ANY PROPOSED CHANGES MUST NOT
IMPEDE THE FUTURE DEVELOPMENT OF THE
SUBSTATION.

3.

BASED ON ORIGINATORS DRAWING No:


13/J2M/3840001.

4.

THIS DRAWING IS FOR PLANNING PURPOSES ONLY.

5.

CABLE ROUTE SHOWN IS INDICATIVE ONLY.

M eet
i
ng /Recor
ds Room

8
Of
f
i
ce

6 5

11

DC/ES

DC/ES
SA CT

DC/ES

CB

VT

PI

SA
A11
a
b

B11
c

144000

HIS

(CB/DC/ES)

110000

C11

10

2
REFERENCE DRAWINGS
DC/ES
PI

PI

SITE ELEVATIONS, SANDFORD 400kV/132kV

SA

SUBSTATION 13/NG/0252 (PINS SHEET 31)


HIS
(CB/CT/

ES

VT/CSE)

PI

DC/ES
CB

ES

SA
C
B

CSE
A

REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION

CSE

OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER


HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471

ACCESS

RO AD

ABNORM AL LOAD ACCESS ROAD

217000

MAY '14

FOR DCO SUBMISSION

AUG '13

FOR S.42 & S.47 CONSULTATION

ISSUE

DATE

COMMENTS

CFK
PM
DRAWN

LD

JB

JB

PB

CHK'D

APP'D

TITLE:

SANDFORD 400kV/132kV SUBSTATION


SITE PLAN

PINS SHEET 30 OF 70

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

NG INVESTMENT No.

21535
NG DRAWING No.

15

75m

13/NG/0251

APPLICATION No.

EN020001
DRAWING No.

N044/22/012

CAD
A1
SCALE

1:750
ISSUE

1:750

SHEET 1 OF 1

SHEET 1 OF 1

National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

BP

U
n
d

Site Map

in
a
Dr

n
ai
Dr

a
r
D
n
i

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

El Sub Sta
Mud

Hi
gh
W
at
e

Pond

9.4m

e
n
i
L

M
ea

e
p
i
P

6.4m

n
ai
Dr

Re

Pond

d
R

DESIGN DRAWINGS

n
i

RO
AD

Ch W
art
i
tt
en h
i
ng

ER
N

&

&

Tank

SEV

n
i
a
Dr

Tank

or

Li
ne

Co

s
n

&

Pi
pe

st

&

(REGULATION 5 (2)(o))

B
3
.
0y
d
m
0

F
F

n
ai
Dr

Tanks

Drai
n

9.4m

Seabank Power Station

Dr
n
ai

SHEET 32 OF 70

MP 13.25

n
ai
Dr

n
i
a
r
D

n
ai
Dr

Pond

n
ai
ns r
ai D
Dr

Seabank Power Station

Crook's Marsh

ai
n

6.7m

Dr

Tk

Dra

n
i
Dr

Dra
i
n

n
i

n
i

a
Dr

n
ai

a
Dr

BRISTOL CITY COUNCIL

Pond

a
v

SP

r
D

Pond

r
D

n
ai

r
a

i
n

in
a

Seabank Power Station


Seabank Power Station

D
r
ai
n

D
r

n
ai

D
r
ai
n

3
0.

Chy

0m
F
F

n
i
ra
D

D
r
n
i
a

Dr
ai
n

r
D

6.7m

Co

n
ai

ns
t
&
CP

or
B

9.1m

&

Dr
ai
n

y
t
Bd ns
Co

UA
Bd
y

Tk

n
Drai

Mast

Tanks

D
ns
ai
r
FF

F
F

SEV
ERN
ROAD

Pi
pe

Li
ne

n
ai
Dr

n
ai
r
D

Pond

Dr
a
i
n
s

MP 13.5

ETL

Crook's Marsh

D
r
a
in

ro

Co

&

st

&

Dra

i
n

Bd

7.6m

Pond

ETL

r
D

RH

n
ai

6.4m

n
i
a
r
D
D
r
ai
n

Dra

i
n

Pond

ET
L

Drai

Dra
i
n

7.0m

Depot

r
D

ai
n

UA

Drai
n

Bd

n
ai

Dr

y
d
B

in
a
r

P
C

&
Depot

th
Pa

V
E
E

Dr
ai
n

&

t
s
n
o
C
o
C

E
N
A
L

N
O
T
E
L
B
A

Dr
ai
n

t
s
n
o
C
D
S

Dr
ai
n

o
r
o
B
D
ra
in

6.7m

N
R
RO
D
A
n
ai
r
D

D
S

in
a
Dr

Tank

Pond
Chy

D
ra

i
n

Ta

Depot

Dr

ra

in

ai
n

Depot
Depot
Chy

Tank

De

ROA

Works

r
a

i
n

CH
ITTE

in
a
Dr

NI
NG

Crook's Marsh

n
ai
Dr

Co
CP

nst

&

Co

Dra
i
n

ns

ro

Co

Bo

TO
N

Bdy

LE

UA

AB

Tanks

Bd

&

Tank
Tank

LA

Tank

6.4m

NE

n
i
a
r
D

Tank

P
i
p
e
li
n
e

Ch

y
s

n
ai
Dr

n
ai
r

Tanks

S
t
u
p
p
i
l
l

Tank

R
h
i
n
e

r
a

i
n

Tanks
Tank

AD

SD

NEW PYLON

NI
NG

RO

Tank

Tank

SE
VE
RN

CHI
TTE
Pi
pe

Furnace

RO
AD

Works

Li
ne

Dr

ai
n

7.0m

LD132

Works
B
Tank

Drain
SD

Tank

Dr
ai
n

CVT

CVT

CVT

2VL1

ES

ES
SA

SA

SA

CT

CT

CT

AIB

CVT

SA

AIB

AIB

AIB

SA

AIB

SA

ROA
D
OTT

SPL

6.4m

W
LA
A
SH
N
E IN
(TGP
K OO
)

GR

EEN

Tank

Foot Bridge
GP

Dra
i
n
D
r
a
i
n

Tank

S
D

S
t
u
p
p
i
l
l

Tank
Tank

Tank

R
h
i
n
e

ot

Key
- FLOOD WALL

p
De
G2-WESTON ROUTEOFCABLETO BEADDED

CVT

LLTAVONMOUTH ROUTEOFCABLETO BEADDED


G1-CHURCHI

CVT

PYLON

SHEAD ROUTEOFCABLETO BEADDED


BW2-RADSTOCKTPORTI

SHEAD ROUTEOFCABLETO BEADDED


BW1-RADSTOCKTPORTI

NG
STI
EXI

HINKLEY POINT

DA2-BRADLEYSTOKEROUTEOFCABLETO BEADDED

SANDFORD

Tank

D
ra
i
n

n
i
Dra

- FLOOD WALL FOUNDATION


- NEW EQUIPMENT
- EXISTING EQUIPMENT

A
Drai
n

RON ACTON ROUTEOFCABLETO BEADDED


DA1-I

RH

Drain

AIB

- AIR INSULATED BUSHING

CVT

- CAPACITOR VOLTAGE TRANSFORMER

CT

- CURRENT TRANSFORMER

ES

- EARTH SWITCH

GIB

- GAS INSULATED BUSBAR

SA

- SURGE ARRESTER

SGT

- SUPER GRID TRANSFORMER

AIB

GIB

Notes
AIB
SA

AIB
CVT

CVT

AIB
CT

CT

SA
ES

OTHERWISE STATED.

CVT

SA

2. ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE


CT

ES

1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS

AIB

AIB

AIB

ES

ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT

AIB

PROVIDED THAT THE SPECIFIED CLEARANCES ARE


GIB

MAINTAINED. ANY PROPOSED CHANGES MUST NOT


IMPEDE THE FUTURE DEVELOPMENT OF THE

AIB

SUBSTATION.
AIB

AIB
3. THIS DRAWING IS FOR PLANNING PURPOSES ONLY.

GIB

TCHGEAR
SSWI
132kVGI
NG
LDI
CONTROLBUI

SEABANK 400kV SUBSTATION

SEABANK 132kV SUBSTATION

SGT1

NG
LDI
CONTROLBUI

4. BASED ON ORGINATORS DRAWING No;


13/J2M/204001
5. CABLE ROUTE SHOWN IS INDICATIVE ONLY.

Reference Drawings

SEABANK 400kV/132kV SUBSTATION ELEVATIONS 13/NG/0255 (PINS SHEET 34)

SGT2

c1 b1 a1

c b a
A

6.4m APPROX

SLIDING ACCESS GATE

4m APPROX

SLIDING ACCESS GATE

ACCESS ROAD

33kV

CFK

LD

JB

MAY '14

FOR DCO SUBMISSION

AUG '13

FOR S.42 & S.47 CONSULTATION

AG

JB

PB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

K.
M.

SWITCHROOM
TITLE:

SEABANK 400kV/132kV SUBSTATION


R

SITE PLAN
A

c1 b1 a1

NEW EQUIPMENT

nk
Ta

c b a

st
Ma

Tk

PINS SHEET 32 OF 70

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

7m
6.

NG INVESTMENT No.

20898
NG DRAWING No.

13/NG/0254
0
1:500

10m

20m

APPLICATION No.

EN020001
DRAWING No.

N056/22/006

CAD
A1
SCALE

1:500
ISSUE

30m
SHEET 1 OF 1

SHEET 1 OF 3

National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

BP

U
n
d

Site Map

in
a
Dr

n
ai
Dr

a
r
D
n
i

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

El Sub Sta
Mud

Hi
gh
W
at
e

Pond

9.4m

e
n
i
L

M
ea

e
p
i
P

6.4m

n
ai
Dr

Re

Pond

d
R

DESIGN DRAWINGS

n
i

RO
AD

Ch W
art
i
tt
en h
i
ng

ER
N

&

&

Tank

SEV

n
i
a
Dr

Tank

or

Li
ne

Co

s
n

&

Pi
pe

st

&

(REGULATION 5 (2)(o))

B
3
.
0y
d
m
0

F
F

n
ai
Dr

Tanks

Drai
n

9.4m

Seabank Power Station

Dr
n
ai

SHEET 33 OF 70

MP 13.25

n
ai
Dr

n
i
a
r
D

n
ai
Dr

Pond

n
ai
ns r
ai D
Dr

Seabank Power Station

Crook's Marsh

ai
n

6.7m

Dr

Tk

Dra

n
i
Dr

Dra
i
n

n
i

n
i

a
Dr

n
ai

a
Dr

BRISTOL CITY COUNCIL

Pond

a
v

SP

r
D

Pond

r
D

n
ai

r
a

i
n

in
a

Seabank Power Station


Seabank Power Station

D
r
ai
n

D
r

n
ai

D
r
ai
n

3
0.

Chy

0m
F
F

n
i
ra
D

D
r
n
i
a

Dr
ai
n

r
D

6.7m

Co

n
ai

ns
t
&
CP

or
B

9.1m

&

Dr
ai
n

y
t
Bd ns
Co

UA
Bd
y

Tk

n
Drai

Mast

Tanks

D
ns
ai
r
FF

F
F

SEV
ERN
ROAD

Pi
pe

Li
ne

n
ai
Dr

n
ai
r
D

Pond

Dr
a
i
n
s

MP 13.5

ETL

Crook's Marsh
LP

D
r
a
in

ro

Co

&

st

&

Dra

i
n

Bd

7.6m

Pond

ETL

r
D

RH

n
ai

6.4m

n
i
a
r
D
D
r
ai
n

Dra

i
n

Pond

ET
L

Drai

Dra
i
n

7.0m

Depot

r
D

ai
n

UA

Drai
n

Bd

n
ai

Dr

y
d
B

in
a
r

P
C

&
Depot

th
Pa

V
E
E

Dr
ai
n

&

t
s
n
o
C
o
C

E
N
A
L

N
O
T
E
L
B
A

Dr
ai
n

t
s
n
o
C
D
S

Dr
ai
n

o
r
o
B
D
ra
in

6.7m

N
R
RO
D
A
n
ai
r
D

D
S

in
a
Dr

Tank

Pond
Chy

D
ra

i
n

Ta

Depot

Dr

ra

in

ai
n

Depot
Depot
Chy

Tank

De

ROA

Works

r
a

i
n

CH
ITTE

in
a
Dr

NI
NG

Crook's Marsh

n
ai
Dr

Co
CP

nst

&

Co

Dra
i
n

ns

ro

Co

Bo

TO
N

Bdy

LE

UA

AB

Tanks

Bd

&

Tank
Tank

LA

Tank

6.4m

NE

n
i
a
r
D

Tank

P
i
p
e
li
n
e

Ch

y
s

n
ai
Dr

n
ai
r

Tanks

S
t
u
p
p
i
l
l

Tank

R
h
i
n
e

SD

AD

r
a

i
n

Tanks
Tank

NI
NG

RO

Tank

Tank

SE
VE
RN

CHI
TTE
Pi
pe

Furnace

RO
AD

Works

Li
ne

Dr

ai
n

7.0m

Works
B
Tank

Drain
SD

Tank

Dr
ai
n

ROA
D

RH

Drain

n
U

6.4m

W
LA
A
SH
N
E IN
(TGP
K OO
)

GR

EEN

Tank

SPL

OTT

Tank

D
ra
i
n

Foot Bridge
GP

Dra
i
n
D
r
a
i
n

Tank

n
i
Dra

S
D

S
t
u
p
p
i
l
l

Tank
Tank

Tank

R
h
i
n
e

ot

Key

p
De

- EQUIPMENT TO BE REMOVED
- EXISTING EQUIPMENT

AIB

- CAPACITOR VOLTAGE TRANSFORMER

ES

- EARTH SWITCH

GIB

- GAS INSULATED BUSBAR

PI

- POST INSULATOR

SA

- SURGE ARRESTOR

SGT

- SUPER GRID TRANSFORMER

Drai
n

NG
STI
EXI

- AIR INSULATED BUSHING

CVT

PYLON
2VL1

SGT4

SA
ES

Notes
PI

1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS


OTHERWISE STATED.

AIB
AIB

CVT

AIB

2. ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE

ES

ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT


PROVIDED THAT THE SPECIFIED CLEARANCES ARE

GIB

MAINTAINED. ANY PROPOSED CHANGES MUST NOT


SA

IMPEDE THE FUTURE DEVELOPMENT OF THE


SUBSTATION.

AIB

3. THIS DRAWING IS FOR PLANNING PURPOSES ONLY.


GIB
4. BASED ON ORGINATORS DRAWING No;
13/J2M/204001

SEABANK 400kV SUBSTATION

Reference Drawings

TCHGEAR
SSWI
132kVGI
NG
LDI
CONTROLBUI

EXI
STI
NG SI
TE

BOUNDARYFENCE

LP

SEABANK 132kV SUBSTATION

SGT1

SEABANK 400kV/132kV SUBSTATION ELEVATIONS 13/NG/0255 (PINS SHEET 34)

SGT2
REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION
OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER
HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT

c1 b1 a1

c b a
C

ORDNANCE SURVEY. OS LICENCE NO. 100048471

EXISTING BOUNDARY
FENCE

ACCESS ROAD

33kV

CFK

LD

JB

MAY '14

FOR DCO SUBMISSION

AUG'13

FOR S.42 & S.47 CONSULTATION

AG

JB

PB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

SWITCHROOM
TITLE:

SEABANK 400kV/132kV SUBSTATION


R

SITE PLAN
A

ks

c1 b1 a1

c b a

EQUIPMENT TO BE REMOVED

n
Ta

s
Ma

Tk

PINS SHEET 33 OF 70

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

7m
6.

NG INVESTMENT No.

20898
NG DRAWING No.

10m

20m

30m

13/NG/0253

APPLICATION No.

EN020001
DRAWING No.

N056/22/006

CAD
A1
SCALE

1:500
ISSUE

1:500
SHEET 1 OF 1

SHEET 2 OF 3

National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER


DESIGN DRAWINGS
(REGULATION 5(2)(o))
SHEET 34 OF 70
BRISTOL CITY COUNCIL

4000

Key
- NEW EQUIPMENT
- EQUIPMENT BEING REMOVED
- EXISTING EQUIPMENT

SECTION A - A

Notes
1.

ALL DIMENSIONS ARE IN MILLIMETRES UNLESS


OTHERWISE STATED.

2.

ALL DIMENSIONS SHOWN ARE TYPICAL AND MAY BE


ADJUSTED TO SUIT MANUFACTURER'S EQUIPMENT
PROVIDED THAT THE SPECIFIED CLEARANCES ARE
MAINTAINED. ANY PROPOSED CHANGES MUST NOT
IMPEDE THE FUTURE DEVELOPMENT OF THE
SUBSTATION.

3.

BASED ON ORIGINATORS DRAWING No:

11000

4.

G.L. 9.50m A.O.D

THIS DRAWING IS FOR PLANNING PURPOSES ONLY.

3099

4000

5400

13000

13/J2M/2040001.

SUBSTATION LEVEL
6.75M A.O.D
REFERENCE DRAWINGS

SECTION B - B
SEABANK 400kV/132kV SUBSTATION PLAN SUBSTATION FENCE &
FLOOD DEFENCE WALL
PART SHOWN FOR CLARITY

SGT4 BEING REMOVED

13/NG/0253 (PINS SHEET 33) & 13/NG/0254

OMITTED FOR CLARITY

(PINS SHEET 32)

REPRODUCED FROM ORDNANCE SURVEY MAPS. BY PERMISSION


OF THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER
HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471

CFK

LD

JB

MAY '14

FOR DCO SUBMISSION

AUG '13

FOR S.42 & S.47 CONSULTATION

AG

JB

PB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

SEABANK 400kV/132kV SUBSTATION


SITE ELEVATIONS
11000

13000

4000

5400

PINS SHEET 34 OF 70

NATIONAL GRID WORKS

WPD WORKS

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

SGT4 BEING REMOVED

SECTION C - C

NG INVESTMENT No.

OMITTED FOR CLARITY

20898
NG DRAWING No.

13/NG/0255

0
1:300

10m

20m

APPLICATION No.

EN020001
DRAWING No.

N056/22/004

30m

CAD
A1
SCALE

1:300
ISSUE

SHEET 1 OF 1

SHEET 3 OF 3

National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc

Potrebbero piacerti anche