13.8 kV CT & VT ADEQUACY CHECK CALCULATIONS

NO.

DATE
D

11//5/2015

BY

MH

CONSTRUCTION OF AL-UQAIR 115/13.8 KV SUBSTATION-A

REVISIONS
DRAWN
HUZAIFA

BY:DATE:-

11-May-15

CHECKED
BY:-

Ahmad Danish

DATE:-

11-May-15

OPRG. DEPT
BY
DATE:-

ENG'G. DEPT.
BY:DATE:-

CERTIFIED.
BY:-

BASE DESIGN

DATE:-

DOCUMENT/DRAWING TITLE
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OF
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

INDEX

PLANT

DRAWING NO.

HA555

EE - 382654

TOTAL SHEETS REV NO.

13.8 kV CT & VT ADEQUACY CHECK CALCULATIONS

CONSTRUCTION OF AL
AL-UQAIR
115/13.8
SUBSTATION-A
UQAIR 115/13
8 KV SUBSTATION
A
AL UQAIR

SAUDI ARABIA

CONTRACT NO:-

4400004656

DWG. CONT. SHT.

EE-382546