Organization and Experience

Beza Consulting Engineers Plc


Address: P.O. Box 41292,
6th floor, Friendship City Center,
Bole Road, Africa Avenue,
Addis Ababa, Ethiopia
Tel: +251 - 116 - 6328 61 / 62
Fax: +251 - 116 627 809
Email: bezaconsult@ethionet.et
Website: www.bce-bci.com or
www.bezaconsultinc.com

International Offices
2300 9th Site South Ste 904, Arlington VA 22204, USA
Tel :( 202)-243-8167 Tel :( 202)-239-8934
P. O. Box 36313, 2nd floor, National Water Building,
Najjanankumbi Branch, Plot 668, Entebbe Road,
Kampala, UGANDA
Phone: +256 414 268 753 Fax: +256 414 268 752
P. O. Box 23999, South C Shopping Center,
Mohoho Avenue, Nairobi KENYA
Phone: +254 727 547751
P.O. Box 37004 Lusaka, ZAMBIA

CONSULTANTS ORGANIZATION AND EXPERIENCE


2.1

Introduction
BEZA Consulting Engineers Plc. is a multi-disciplinary consulting firm established
in 2000 by professional engineers. It is organized in a conducive environment for
providing exemplary high quality professional consultancy services with in a
reasonable completion time frame. It focuses mainly on highway engineering
works.

2.2

Brief Description of Firms Experience


Beza Consulting Engineers Plc. has rendered professional services on feasibility
study, detailed Engineering investigation and design, design review, construction
supervision, contract administration and survey works of roads, bridges, buildings
and high tension power lines which enable the company to attain its current high
level profile. The Firm has an extensive experience in the road sector and our
professionals are well versed and knowledgeable to the conditions of the Eastern
Region of Africa.

2.3

Firm Experiences
The firm's recent experiences, which are relevant to the proposed projects, are
categorised according to the nature of the services and are included hereunder.
Confirmation letters from Clients is attached in Appendix B.
A.

Feasibility Study, Detailed Engineering Design and Design Review Projects

B.

Construction Supervision and Contract Administration Projects

C.

Detailed Design and Construction Supervision Projects

D.

Environmental and Social Works

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

A. Feasibility Study, Detailed Engineering Design and


Design Review Projects

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
3

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Endaselassie Dejena Dansha Road Project


Contract 1: Endaselassie Dedebit (70.446 km)
Contract 2: Dedebit Adi Remet (76.492)
Contract 3: Dansha-Dejena Adi Remet (97.64 km)
Co untry: ETHIOPIA
Lo cation within Country: Northern part of Ethiopia
N am e o f Client: Ethiopian Roads Authority
Financing Agency: Government of Ethiopia
Address:

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

February 2007

Co m pletion date (month/year):

March 2008

N am e of associated consultants, if any:


Roughton International

US$ 1,506,813

Duration o f assignment (month): 13


To tal No of staff-months of the assignment: 163
Approx. value o f the services provided by your firm under
the contract (in current US$):
US$ 191.039

N o o f professional staff-months provided by associated


Co nsultants:
43
N am e of Senior professional staff o f yo ur firm inv o lv ed
and functio ns pe rfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Gidey G/Egziabher
Getahun Worku
Dr. Asnake Adamu
Amare Kassa
Dr. Yilma Sileshi

Pavement/Material Engineer
Environmentalist
Structural Engineer
Sociologist
Hydrologist

N arrative description of Project:

Feasibility Study, Environmental Impact Assessment (EIA),


Resettlement Action Plan (RAP), Detailed Engineering
Design, Tender Document Preparation.

Status: Completed

Description of actual services provided by your staff within the assignment:


Feasibility Study, Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP), Detailed Engineering
Design, Tender Document Preparation of Endaselassie Dejena Dansha Road Project. The project is packaged in to three
Contracts, Contract 1: Endaselassie Dedebit Road (70km), Contract 2: Dedebit Adi Remet (76km), Contract 3: Adi
Remet - Dejena Dansha- Road (98km). The project road is designed to asphalt Concrete, double lane and single
carriageway.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
4

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Aposto Wendo Negele Road Project

US$ 400,000

Co untry: ETHIOPIA

Duration o f assignment (month): 19

Lo cation within Country: Southern East Part of


Ethiopia
N am e of Client: Ethiopian Roads Authority
Financing Agency : World Bank
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):
Co m pletion date
(m o nth/year):

To tal No of staff-months of the assignment: 148


Approx. value o f the services provided by your firm under the
co ntract (in current US$):
US$ 400,000

December 2005
June 2007

N am e of associated consultants, if any:


BKS Group

N o o f professional staff-months provided by associated Consultants:


48
N am e o f Senio r pro fessio nal staff o f yo ur firm inv o lv ed and
functions perform ed (indicate m o st significant pro files such as
P ro ject Directo r/Co o rdinato r, Team Leader):
Gidey G/Egziabher
Pavement/Material Engineer
Getahun Worku
Environmentalist
Solomon Tadesse
Structural Engineer
Amare Kassa
Sociologist

N arrative description of Project:


The project is Review of Feasibility Study,
Environmental Impact Assessment (EIA),
Resettlement Action Plan (RAP), Detailed
Engineering Design, Tender Document Preparation
and Financial Proposal Preparation for Aposto
WendoNegele Road Project. Status: Completed

Description of actual services provided by your staff within the assignment:


Review of Feasibility Study, Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP), Detailed Engineering
Design, Tender Document Preparation and Financial Proposal Preparation for Aposto WendoNegele Road Project packaged
in to 3 contracts. The total project length is 267KM and the road is designed to bitumen paved standard, double lane and
single carriageway.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
5

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Mekenajo Dembidolo Road Project (185km)

US$ 550,000

Co untry: ETHIOPIA
Lo cation within Country: Western part of Ethiopia

Duration o f assignment (month): 13

N am e of Client: Ethiopian Roads Authority


Financing Agency : World Bank

To tal No of staff-months of the assignment: 156

Address:

Approx. value o f the services provided by your firm under the


co ntract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

December 2005

Co m pletion date (month/year):

June 2006

550,000

N am e of associated consultants, if any:


SPAN Consultant

N o o f professional staff-months provided by associated


Co nsultants:
36
N am e of Senior professional staff o f yo ur firm inv o lv ed and
functions performed (indicate most significant profiles such as
P ro ject Directo r/Co o rdinato r, Team Leader):
Gidey G/Egziabher
Getahun Worku
Dr. Asnake Adamu
Amare Kassa
Tigist W/Kidan

Pavement/Material Engineer
Environmentalist
Structural Engineer
Sociologist
Contract Engineer

N arrative description of Project:


The project is Review of Feasibility Study
Environmental Impact Assessment (EIA), Resettlement
Action Plan (RAP), Detailed Engineering Design,
Tender Document Preparation and Financial Proposal
Preparation for Mekenajo - Dembidolo Road Project.

Status: Completed

Description of actual services provided by your staff within the assignment:


Review of Feasibility Study Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP), Detailed
Engineering Design, Tender Document Preparation and Financial Proposal Preparation for Mekenajo - Dembidolo Road
Project packaged into three equivalent contracts. The road is designed to asphalt concrete pavement type, double lane and
single carriageway. The total project length is 185km.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
6

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Approx. Value of Services (in current USD):

P ro ject Name:

US$ 308,314.6

Goro-Haro-Dibe-Filtu Road Project

Lot 1 - Goro Raitu Jibril (60 km)

Lot 2 - Jibril Hardobicle Kundi (76km)

Lot 3 - Kundi Jirmo Genale (73km)

Lot 4 Genale Melkahager Filtu (96km)


Co untry: ETHIOPIA
Lo cation within Country: Eastern Ethiopia

Duration o f assignment (month): 25 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia

To tal No of staff: 15

Address:

N o o f Staff Months: 71

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

December 2007

June, 2010

US$ 308,314.6

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided


by associated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Tigist Tesfaye
Mehamed Jemal
Amare Kassa
Getahun Worku
Gidey G/Egziabher
Yilma Sileshi (Dr.Ing)
Mulu W/Hawriat
Nigatu Fekadu
Fisseha Tafesse
Andualem H/Girogis

Senior Highway Road Design Engineer/Team Leader


Transport Economist
Sociologist
Environmentalist
Material/Pavement Engineer
Senior Hydrology/Hydraulic Engineer
Senior Structural Engineer
Geotechnical Engineer
Contract Engineer
CADD Design Expert

N arrative Description of Project:


The project is Detail Feasibility & EIA Study, Resettlement Action Plan, Detail Engineering Design and Tender Document
Preparation for Goro - Haro - Dibe - Filtu Road Project, Status: Completed
Description of Actual Services Provided by your Staff:
Detail Feasibility & EIA Study, Resettlement Action Plan, Detail Engineering Design and Tender Document Preparation
for Goro - Haro - Dibe - Filtu Road Project packaged in to four lots, Lot 1: Goro Raitu Jibril Road (60km), Lot 2 - Jibril
Hardobicle Kundi (76km), Lot 3 - Kundi Jirmo Genale (73km), Lot 4 Genale Melkahager Filtu (96km). The
entire project road is designed to gravel surfaced, double lane and single carriageway.
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
7

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Yabelo - Metagefersa - Shakiso Road Project


Lot 1 - Yabelo Metagefersa - Oblo
Lot 2- Oblo Dermi
Lot 3- Dermi - Shakiso

US$ 315,459.4

Co untry: ETHIOPIA
Lo cation within Country: Southern Ethiopia

Duration o f assignment (month): 15 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia

To tal No of staff: 15

Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

N o o f Staff Months: 71

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

January 2008

October 2010

US$ 315,459.4

N am e of Associated Firm(s) if any:


None

N o o f months of professional staff -months provided


by associated Firm(s):

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Hailu Mekonnen
Amare Kassa
Getahun Worku
Kifle Bogale
Gebeyehu Aragaw
Fisseha Tafesse
Mekonnen Degefu
Tewodros Zewdu
Nigatu Fekadu
Hailu Kenea

Senior Highway Road Design Engineer/Team Leader


Sociologist
Environmentalist
Pavement/Material Engineer
Senior Hydrologist/Hydraulics Engineer
Contract Engineer
Senior Structural Engineer
CADD Engineer
Geotechnical Engineer
Transport Economist

N arrative Description of Project:


The project is Detail Feasibility Study, EIA Study, Resettlement Action Plan, Detail Engineering Design and Tender
Document Preparation for Yabelo - Metagefersa - Shakiso Road Project, Status: Completed
Description of Actual Services Provided by your Staff:
Detail Feasibility Study, EIA Study, Resettlement Action Plan, Detail Engineering Design and Tender Document
Preparation for Yabelo - Metagefersa - Shakiso Road Project packaged in to three lots; Lot 1: Yabelo Metagefersa - Oblo
Road, Lot 2- Oblo Dermi, Lot 3- Dermi Shakiso. The project road is designed to gravel surfaced, double lane and
single carriageway.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
8

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Gelego - Guba Road Upgrading Project, 156km

US$ 269,127.26

Co untry: ETHIOPIA

Duration o f assignment (month): 12

Lo cation within Country: North-West part of Ethiopia


N am e of Client: Ethiopian Roads Authority
Financing Agency : Nordic Development Fund
Address:

To tal No of staff-months of the assignment: 223


Approx. value o f the services provided by your firm under the
co ntract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

February 2007

Co m pletion date (month/year):

January 2008

US$ 269,127.26

N am e of associated consultants, if any:


NIRAS & Roughton

N o o f professional staff-months provided by associated


Co nsultants:
73
N am e of Senior professional staff of yo ur firm inv o lv ed and
functions performed (indicate most significant profiles such as
P ro ject Directo r/Co o rdinato r, Team Leader):
Gidey G/Egziabher
Getahun Worku
Dr.Asnake Adamu
Amare Kassa

Pavement/Material Engineer
Environmentalist
Structural Engineer
Sociologist

N arrative description of Project:


The project is Feasibility Study, Environmental Impact
Assessment (EIA), Resettlement Action Plan (RAP),
Detail Design Review and Tender Document Preparation
for Gelego - Guba Road Upgrading Project.

Status: Completed

Description of actual services provided by your staff within the assignment:


Feasibility Study, Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP), Detail Design Review and
Tender Document Preparation for Gelego - Guba Road Upgrading Project. The road is designed to higher standard gravel
surfaced, double lane & single carriageway. The total project length is 156km

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
9

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Guba - Wenbera Road Upgrading Project, 141km

US$ 230,580.51

Co untry: ETHIOPIA

Duration o f assignment (month): 12

Lo cation within Country: North-West part of


Ethiopia
N am e of Client: Ethiopian Roads Authority
Financing Agency : Nordic Development Fund
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):
Co m pletion date
(m o nth/year):

To tal No of staff-months of the assignment: 211


Approx. value o f the services provided by your firm under the
co ntract (in current US$):
US$ 230,580.51

February 2007

N o o f professional staff-months provided by associated Consultants:


68

January 2008

N am e of associated consultants, if any:


NIRAS & Roughton in joint venture with Beza
Consulting Engineers

N am e o f Senio r pro fessio nal staff o f yo ur firm inv o lv ed and


functions performed (indicate m o st significant pro files such as
P ro ject Directo r/Co o rdinato r, Team Leader):

Tadele Manbegrot
Getahun Worku
Dr. Asnake Adamu
Amare Kassa
Tigist W/Kidan

Pavement/Material Engineer
Environmentalist
Structural Engineer
Sociologist
Contract Engineer

N arrative description of Project:


The project is Feasibility Study, Environmental
Impact Assessment (EIA), Resettlement Action Plan
(RAP), Detail Engineering Design and Tender
Document Preparation for Guba - Wenbera Road
Upgrading Project.

Status : Completed
Description of actual services provided by your staff within the assignment:
Feasibility Study, Environmental Impact Assessment (EIA), Resettlement Action Plan (RAP), Detail Engineering Design
and Tender Document Preparation for Guba - Wenbera Road Upgrading Project. The road is gravel surfaced double lane
and single carriageway. The total project length is 141km.
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
10

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Nekemte Bedele Metu Road project

US$ 368,000

Nekemte-Bedele (96km)
Bedele-Metu (112km)

Co untry: ETHIOPIA

Duration o f assignment (month): 13 months

Lo cation within Country: Oromia Regional State


N am e of Client: Ethiopian Roads Authority
Financing Agency : World Bank

To tal No of staff: 12

Address:

N o o f Staff Months: 60

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

Feb. 2009

March 2010

US$ 368,000

N am e of Associated Firm(s) if any:

N o o f months of professional staff-months provided by


asso ciated Firm(s): 18

Roughton International (Leading Firm)


N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Bazin Haile
Fikremariam Tadesse
Getahun Worku
Gebeyehu Aragaw
Daniel Abebe
Amare Kassa
Abera Worku

Hydrologist
Pavement/Material Engineer
Environmentalist
Structural Engineer
Geotechnical Engineer
Sociologist
Senior Surveyor

N arrative Description of Project:


Feasibility Study, Environmental Impact Assessment, Detailed Engineering Design and Tender Document P reparation.

Status : Completed
Description of Actual Services Provided by your Staff:
Detail Feasibility Study, Environmental Impact Assessment, Detail Engineering Design and Tender Document
Preparation for Nekemte-Bedele-Metu Road Project packaged in to two lots; Lot 1: Nekemte-Bedele Road (96km), Lot 2Bedele-Metu (112km). The project road is designed to bitumen surfaced, double lane and single carriageway.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
11

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Review and Update of the Feasibility Study and Detailed


Engineering Design for the Upgrading of Kapchorwa Suam
Road (Asphalt) 73km

US$ 609,400.00

Co untry: Uganda

Duration o f assignment (month): 8 months

Lo cation within Country: North East of Uganda


N am e of Client: Uganda National Roads Authority (UNRA)

To tal No of staff: 15

Financing Agency : Africa Development Bank


Address:

N o o f Staff Months: 69

Uganda National Roads Authority


P.O.Box 28487
Kampala, Uganda
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

August 2009

April 2010

US$ 547,300

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): 20

KOM Consulting Engineers & Planners (Uganda)


N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
M. Ram Mohan Rao
Tigist Tesfaye
Mekonnen Degefu
Gidey G/Egziabher
Gebeyehu Aragaw
Mohammed Jemal
Melaku Abiyou
Taddele Debela

Team Leader
Highway Engineer
Structural Engineer
Material Engineer
Hydrologist
Transport Economist
Social Land Economist
Natural Resource management Specialist

N arrative Description of Project:


Review of Economic Feasibility Study, Review of Detail Engineering Design, Environmental & Social Impact Assessment
and Preparation of Resettlement Action Plan for Kapchorwa Suam Road (Asphalt)-73km. Status: Completed
Description of Actual Services Provided by your Staff:
Topo-Survey, Review of Road alignment, Design standard, Geometric Design, Pavement Design. Hydrological Design,
Structural Design & Tender Documents, Environmental & Social Impact Assessment, Preparation of Resettlement Action
Plan.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
12

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current U S$ o r E uro ):

Shek Hussien - Micheta Road Construction Project Contract


I- Supplementary Agreement No.1

US$ 31,980.13

Co untry: ETHIOPIA

Duration o f assignment (month): 6 months

Lo catio n within Co untry: Oromia Region West Harargae


N am e of Client: Ethiopian Roads Authority

To tal No of staff-months of the assignment: 462

Financing Agency : Government of Ethiopia


Address:

Approx. value o f the services provided by your firm under


the contract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

June 2005

Co m pletion date (month/year):

January 2006

US$ 31,980.13

N am e of associated consultants, if any:


None

N o o f professional staff-months provided by associated


Co nsultants:
-

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Dawit Awoke
Belay Mulugeta

Highway Engineer
Material/Pavement Engineer

N arrative description of Project:


The project length is 115km and the road is Gravel surfaced, Dual Lane, Single Carriageway.
Carry out Detailed Engineering Design for the realignment section
Carry out Detailed Engineering Design for the difficult terrain section 71+240 115+500 and link between Micheta
Shek Hussien to Dera Mechara Road (Gravel surfaced)

Status : Completed
Description of actual services provided by your staff within the assignment:
All field and office surveying and design work
Proposed economical alternative route
Performed detail geometric and pavement design

Prepared detail drawings and reports and submitted to ERA for review and comments and for subsequent approval

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
13

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current U S$ o r E uro ):

Shek Hussien - Micheta Road Construction Project Contract


II-Supplementary Agreement No.1

US$ 32,017.01

Co untry: ETHIOPIA

Duration o f assignment (month):

Lo catio n within Co untry: Oromia Region West Harargae

6 months

N am e of Client: Ethiopian Roads Authority

To tal No of staff-months of the assignment: 12

Financing Agency : Government of Ethiopia

Address:

Approx. value o f the services provided by your firm under


the contract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

June 2005

Co m pletion date (month/year):

January 2006

US$ 32,017.01

N am e of associated consultants, if any:


None

N o o f professional staff-months provided by associated


Co nsultants:
-

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r /Co o rdinato r, Team
Leader):
Dawit Awoke
Belay Mulugeta

Highway Engineer
Material/Pavement Engineer

N arrative description of Project:


The project length is 55km and the road is Gravel Surfaced, double lane, and single carriageway.
Carry out Detailed Engineering Design for the realignment section
Carry out Detailed Engineering Design for the difficult terrain section and link between Shek Hussien Micheta to
Dera Mechara Road (Gravel surfaced)

Status : Completed
Description of actual services provided by your staff within the assignment:

All field and office surveying and design work


Proposed economical alternative route
Performed detail geometric, structural and pavement design
Prepared detail drawings and reports and submitted to ERA for review and comments and for subsequent approval

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
14

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current U S$ o r E uro ):

Consultancy Services for Detailed Engineering Design &


Tender Document Preparation of Dabat-Kirakir Road Project
(Lot 4)-225km

US$ 77,446.94

Co untry: ETHIOPIA

Duration o f assignment (month):

Lo catio n within Co untry: Amhara Region

8 months

N am e of Client: Amhara Rural Roads Authority

To tal No of staff-months of the assignment: 56

Financing Agency : Government of Ethiopia


Address:
Amhara Rural Roads Authority
P.O.Box 382
Bahir Dar, Ethiopia

Approx. value o f the services provided by your firm under


the contract (in current US$):
US$ 77,446.94

Start Date (month/year):

February 2010

Co m pletion date (month/year):

September 2011

N am e of associated consultants, if any:


None

N o o f professional staff-months provided by associated


Co nsultants: -

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Tigist Tesfaye
Gidey G/Egziabher
Fiseha Tafesse
Bazin Haile
Getahun Worku
Mulu W/Hawariat

Team Leader/Highway Engineer


Material/Pavement Engineer
Contract Engineer
Hydrologist
Environmentalist
Structural Engineer

N arrative description of Project:


The project is to Carry out Detailed Engineering Design and Preparation of Tender Document/Cost Estimate . The project
length is 225km and the road is Gravel Surfaced, double lane and single carriageway.

Status : completed
Description of actual services provided by your staff within the assignment:

All field and office surveying and design work


Proposed economical alternative route
Perform detail geometric, structural and pavement design
Prepare detail drawings, tender document and reports and submitted to ARRA for review and comments and for
subsequent approval

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
15

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current U S$ o r E uro ):

Consultancy Services for EIA study, Detailed Engineering


Design, and Tender Document Preparation of WegeltenaLamdengay-Micharemeda Road Project

US$ 66,391.33

Co untry: ETHIOPIA

Duration o f assignment (month):

Lo catio n within Co untry: Amhara Region

7 months

N am e of Client: Amhara Rural Roads Authority


Financing Agency : Government of Ethiopia

To tal No of staff-months of the assignment: 52

Address:

Approx. value o f the services provided by your firm under


the contract (in current US$):

Amhara Rural Roads Authority


P.O.Box 382
Bahir Dar, Ethiopia

US$ 66,391.33

Start Date (month/year):

Nov. 2009

Co m pletion date (month/year):

May 2010

N am e of associated consultants, if any:


None

N o o f professional staff-months provided by associated


Co nsultants:
N am e of Senior professional staff o f y o ur firm inv o lv ed
and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Hailu Mekonnen
Kifle Bogale
Bazin Haile
Frehiwot Zeleke

Highway Engineer
Material/Pavement Engineer
Senior Hydrologist
Contract Engineer

N arrative description of Project:


The project is to Carry out Detailed Engineering Design, Environmental Impact Assessment and Tender Document
Preparation. The project length is 83km and the road is Gravel Surfaced, double lane, and single carriageway.

Status : Completed
Description of actual services provided by your staff within the assignment:

All field and office surveying and design work


Proposed economical alternative route
Perform detail geometric, structural and pavement design
Prepare detail drawings, tender document and reports and submitted to ARRA for review and comments and for
subsequent approval

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
16

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Consultancy Service for Detailed Engineering Design study for


Upgrading the serviceability of KHARTOUM MEDANI Road
project

US$ 457,597.00

Co untry: Sudan

Duration o f assignment (month): 5 months

Lo cation within Country: Khartoum


N am e of Client:

To tal No of staff: 13

National Highway Authority, Khartoum, Sudan


Address:

N o o f Staff Months: 34.5

National Highway Authority Khartoum, Sudan

Start Date (Month/Year):

Co m pletion date (Month/Year):

January 2010

May 2011

Approx. Value of Services provided by your firm (in


current USD):
US$ 112,928.57

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): 10.5

Galander Engineering Consultants Co. Ltd (Khartoum/Sudan)


in joint venture with Beza consulting Engineers Plc
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Mohammed Jemal
Gidey Gebregziabher
Mulu Weldehawariat
Getahun Worku

Senior Transport Economist


Senior Pavement/ Material/ Geotechnical Engineer
Structural Engineer
Environmentalist

N arrative Description of Project:


The project length is 170km and project is upgrading of the serviceability in terms of widening .
Carry out Detailed Engineering Design
Tender Document Preparation
Status : o n go ing
Description of Actual Services Provided by your Staff:
Traffic Analysis, Road Audit, Axle load Survey, Topo-Survey, investigation of Road alignment, Design standard, soil and
Material, Geometric Design, Pavement Design. Hydrological Design, Structural Design & Tender Do cuments,
Environmental & Social Impact Assessment, Preparation of Resettlement Action Plan.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
17

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

B.

Detailed Design and Construction Supervision Projects

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
18

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Addis Gibe River Road Overlay Project (199 Km) (Asphalt


Co ncrete)

US$ 842,341.17

Co untry: ETHIOPIA
Lo cation within Country: Oromia Region

Duration o f assignment (months):


36 months

N am e o f Client:

N o o f Staff: 11

Ethiopian Roads Authority

Financing Agency : Government of Ethiopia


Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

N o o f Staff Months: 211

Co m pletion date (Month/Year):

December, 2011

April, 2015

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 842,341.17
N o o f months of professional staff-months provided by
asso ciated Firm(s):

N am e of Associated Firm(s) if any:


None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Woldu Mulugeta
Samson Abebayehu
Kifle Bogale
Gebeyehu Argaw
Gidey Geberegziabher
Emebet Woldeab
Fekadu Abera
Abera Worku
Fisseha Tafesse
Getahun Worku
Hailu Mekonnen
N arrative Description of Project:

Resident Engineer
Assistant Resident Engineer
P av ement/Material Engineer
Structural Engineer
Geo technical Engineer
Highway Engineer
Quantity Surveyor
Senio r Surveyor
Claim s Expert
E nv ironmentalist
Traffic Engineer

The project is Detail Engineering Design, Tender Document


Preparation and construction supervision of Addis Gibe Road
Overlay Project. The Project length is 199 km, Status: Design
1 0 0 % Co m pleted

Description of Actual Services Provided by your Staff:

Topographic survey sub-grade, existing pavement and material investigation, preliminary and detailed
engineering design (Geometric, pavement, drainage structures and street lightings), Construction Supervision
and Tender Document Preparation.
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
19

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Lideta light of Desie Hotel Timbaho Monopol, Bus No.3


Mazoria Roundabout-Bisrate Gebriel-Tele-Road From Lideta
and Bisrate Gebriel - Tele-Pushkin Square -Gotera Road
Projects (Asphalt Co ncrete)
Co untry: ETHIOPIA
Lo cation within Country: Addis Ababa City

US$ 108,663.50

Duration o f assignment (months):


19 months

N am e of Client: Addis Ababa City Roads Authority (AACRA)


Financing Agency : Government of Ethiopia

N o o f Staff: 20

Address:

N o o f Staff Months: 179

Addis Ababa City Roads Authority


P.O.Box 9206, Addis Ababa, Ethiopia
Start Date (Month/Year):
Co m pletion date (Month/Year):
March 2005

September 2006

N am e of associated consultants, if any:


None

Approx. value o f the services provided by your firm under


the contract (in current US$)
US$ 108,663.50
N o o f months of professional staff -months provided by
asso ciated Firm(s): -

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Andualem H/Georgis
Bazin Haile
Kifle Bogale
Bazin Haile
Tigist W/Kidan
Fisseha Tafesse
Yimegnushal Abebe
Endashaw Kebede

Highway Engineer
Structural Engineers
Pavement/material Engineer
Hydrologist
Contract Engineer
Resident Engineer
Senior Surveyor
Quantity Surveyor

N arrative Description of Project:


The project is detailed design and construction supervision of 15 km long and
30m wide urban road. The road is 6 lanes with Asphalt Co ncrete pavement.

Status: Completed

Description of Actual Services Provided by your Staff:


Topographic survey sub-grade, existing pavement and material investigation, preliminary and detailed engineering design
(Geometric, pavement, drainage structures and street lightings) and Construction Supervision. The road includes one
interchange at Gofa Mazoria, three roundabouts and several important junctions and split level (grade separation) for
provision of accesses.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
20

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Megenagna British Embassy -Kebena - Ginfile - Arat Killo


and Kebena Bridge-Minilik Hospital Road Upgrading Project
(Asphalt Co ncrete )

US$ 114,942.53

Co untry: ETHIOPIA
Lo cation within Country: Addis Ababa City

Duration o f assignment (months):


18 months

N am e of Client: Addis Ababa City Roads Authority (AACRA)

N o o f Staff: 20

Financing Agency : Government of Ethiopia


Address:
Addis Ababa City Roads Authority
P.O.Box 9206, Addis Ababa, Ethiopia

N o o f Staff Months: 129

Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$)

March 2004

October 2006

US$ 114,942.53

N am e of Associated Firm(s) if any:

N o o f months of professional staff-months provided by


asso ciated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Andualem H/Georgis
Solomon Tadesse
Gidey G/Egziabher
Paulos Shimeles
Asnake Abate
Tewodros Zewdu
Habte Tsegaw
N arrative Description of Project:

Highway Engineer
Structural Engineer
Material Engineer
Professional Hydrologist
Contract Engineer
Resident Engineer
Senior Surveyor

The project is Detail Engineering Design, Tender Document


Preparation and construction supervision of Megenagna British
Embassy -Kebena - Ginfile - Arat Killo and Kebena Bridge Minilik
Hospital Road Upgrading Project. The Project length is 5.8 km,
with road width of 40m and 9 lanes, Asphalt Co ncrete pavement.

Status : Completed

Description of Actual Services Provided by your Staff:


Topo-Survey, Road Alignment, Land Acquisition, Detailed Design of Geometric, Pavement, Drainage Structures and
Street Lighting and Construction Supervision. The road includes two roundabouts and several important junctions and
split level (grade separation) for provision of accesses. In addition, An underpass is provided near Kebena Bridge.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
21

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name

Approx. Value of Services (in current USD):

Detailed Engineering Design, Tender Document Preparation and


Construction Supervision of Jimma Intra City Roads Project

US$ 128,160.92

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Jimma (Oromia Regional State)

12 months

N am e of Client: Jimma City Administration

N o o f Staff: 8

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 65

Jimma City Administratio n


P.O.Box 203, Jimma, Oromia Regional State
Start Date (Month/Year):
January 2006

Co m pletion date (Month/Year):


December 2006

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 128,160.92

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided


by associated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Asfaw Debebe
Andualem H/Giorgis
Dr. Yilma Sileshi
Dr. Asnake Adamu

Project Manager/Resident Engineer


Pavement/Material Engineer
Hydrologist
Structural Engineer

N arrative Description of Project:


The project is Detailed Engineering Design, Tender Document Preparation and Construction Supervision of Jimma intra city Roads Project. The Project length is about 23 km, width 12-30m, some of which are double surface treatment and some
Asphalt concrete. The design included 6 laning for a few of the road segments of the project road. Status: Completed
Description of Actual Services Provided by your Staff:
Topographic-Survey, Road Alignment, Land Acquisition, Detailed Design of Geometric, Pavement, Drainage Structures,
street lighting, preparation of Tender Documents and Construction Supervision. The roads include various roundabout
and important intersections. In addition, split level grade separated vertical alignments have been provided at some
locations for ease of accesses.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
22

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:
Kebridehar-Gode Road
Kebridehar Denen

Approx. value o f the contract (in current US$ or Euro):


Upgrading

Project,

Contract

I:

US$ 1,209,677.42

Co untry: ETHIOPIA
Lo cation within Country: Eastern part of Ethiopia

Duration o f assignment (months):


27 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia

N o o f Staff: 8

Address:

To tal No of staff-months of the assignment:

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

216

December 2006

Co m pletion date (month/year):

December 2006

N am e of associated consultants, if any:

Approx. value o f the services provided by your firm


under the contract (in current US$ or Euro):
US$ 1,209,677.42

N o o f professional staff-months provided by associated


Co nsultants:

N am e of Senior professional staff of your firm involved and functions performed (indicate most significant profiles such as
P ro ject Directo r/Co o rdinato r, Team Leader):
Mulugeta Tiku
Kifle H/Michael
Dr. Yilma Sileshi
Dr. Asnake Adamu
Melakhiwot Abera
Tsegaw Aragie

Team Leader/Highway Engineer


Resident Engineer
Hydrologist
Structural Engineer
Quantity Surveyor
Senior Surveyor

N arrative description of Project:


The project is Detailed Engineering Design, Quantity Estimation and
Construction Supervision of Kebridehar-Gode Road Upgrading Project,
Contract I: Kebridehar Denen Road. The project length is 90km and the
road is Double surface treatment, Pavement structure, with Dual lane,
Single Carriageway.

Status: 51% Completed

Description of actual services provided by your staff within the assignment:


Topographic Survey, Detail Design, Quantity estimation and Construction Supervision

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
23

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:
Kebridehar-Gode
Denen Gode

Approx. value o f the contract (in current US$ or Euro):


Road Upgrading Project, Contract II:

US$ 1,209,677.42

Co untry: ETHIOPIA
Lo cation within Country: Eastern part of Ethiopia

Duration o f assignment (months):


37 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia

N o o f Staff: 8

Address:

To tal No of staff-months of the assignment:

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

December 2006

Co m pletion date (month/year):

Aug. 2012

216

Approx. value o f the services provided by your firm under


the contract (in current US$ or Euro):
US$ 1,209,677.42

N am e of associated consultants, if any:

N o o f professional staff-months provided by associated


Co nsultants:
-

N am e of Senior professional staff of your firm involved and functions performed (indicate most significant profiles such as
P ro ject Directo r/Co o rdinato r, Team Leader):
Mulugeta Tiku
Moahmemd Beshir
Mehari Yigzaw
Lijialem Yalew
Dr. Yilma Sileshi
Dr. Asnake Adamu

Team Leader/Highway Engineer


Resident Engineer
Asst Resident Engineer
Quantity Surveyor
Hydrologist
Structural Engineer

N arrative description of Project:


The project is Detailed Engineering Design, Quantity Estimation and Construction Supervision of Kebridehar - Gode Road
Upgrading Project, Contract II: Denen Gode Road. The project length is 72km and the road is Double surface treatment,
Pavement structure, with Dual Lane, Single carriageway. Status: 70% Completed
Description of actual services provided by your staff within the assignment:
Topographic Survey, Detail Design, Quantity estimation and Construction Supervision

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
24

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Shire Endasellassie Intra-Town Roads Upgrading Project

US$ 104,498.27

Co untry: ETHIOPIA
Lo cation within Country: Shire (Tigray Regional State)

Duration o f assignment (months):


15 months

N am e of Client: UDCBO
Financing Agency : Government of Ethiopia

N o o f Staff: 20

Address:

N o o f Staff Months: 73

MoWUD (UDCBO)
Tele: +251 -11 554 0629
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

October 2006

March 2008

US$ 104,498.27

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Tewdros Zewdu
Dr. Asnake Adamu
Girma Abebe
Amare Kassa

Highway Design Engineer


Professional Structural Engineer
Professional Material Engineer
Sociologist

N arrative Description of Project:


The project is Detail Engineering Design, Tender Document Preparation, construction
supervision of Shire Endasellassie Intra-Town Roads Upgrading Project. The Project length is
20.9km, width 12-18m all are design to double surface treatment. The road is Double Lane,
Single carriageway and the design included 6 laning for a few road segments of the project
road.

Status: Completed

Description of Actual Services Provided by your Staff:


Topographic Survey, Road Alignment, Land Acquisition, Detailed Design of Geometric, Pavement, Drainage Structures
and street lighting, preparation of Tender Documents and construction supervision.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
25

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Bonga Ameya Chida Road Upgrading Project (115km)

US$ 512,590.00

Co untry: ETHIOPIA

Duration o f assignment (month): 59

Lo cation within Country: Southern West Part of Ethiopia


N am e of Client: Ethiopian Roads Authority
Financing Agency : Government of Ethiopia
Address:

To tal No of staff-months of the assignment: 108


Approx. value o f the services provided by your firm under
the contract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (month/year):

December 2005

Co m pletion date (month/year):

November 2010

US$ 125,771.57

N am e of associated consultants, if any:


BKS Group in association with Beza Consulting Engineers

N o o f professional staff-months provided by associated


Co nsultants:
35

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Belay Mulugeta
Yilma Sileshi (Dr.)
Getahun Worku
Mamushet Cherinet
Amare Kassa

Pavement/Material Engineer
Hydrologist
Environmentalist
Senior surveyor
Sociologist

N arrative description of Project:


The Project is Review of Feasibility study, Environmental Impact
Assessment (EIA), Resettlement Action Plan (RAP), Detailed Engineering
Design Review and Construction Supervision of 115km of the BongaAmeya-Chida Asphalt Concrete Road. The road is Gravel surfaced road,
double lane, single carriageway and the project length is 115 KM . Status:

Completed
Description of actual services provided by your staff within the assignment:
Review of Feasibility study and Environmental Impact Assessment, Detailed Engineering Design Review and Tender
Document Preparation.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
26

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Package 22 Asphalt Concrete Road Projects


Lideta LDP Road of
A1 Lideta Light Police Hospital: 0.6km
A2 - Lideta Light Joshansen: 0.9km
A3 Joshansen Fifth Police Station: 0.4km
Internal Streets I (A4 A6): 1.1km
Internal Streets II (A7 A19): 3.4km
Balcha Hospital Geja Sefer Molla Maru: 1.5km
Jhosansen-Geja Sefer Pepsi: 1.2km

US$ 357, 843.34

Mexico Esregnaw Michael: 1.6km

Co untry: ETHIOPIA
Lo cation within Country: Addis Ababa City

Duration o f assignment (months):


36 months

N am e of Client: Addis Ababa City Roads Authority


(AACRA)

N o o f Staff: 22

Address:

N o o f Staff Months: 227

Addis Ababa City Roads Authority


P.O.Box 9206, Addis Ababa, Ethiopia
Start Date (Month/Year): Co m pletion date (Month/Year):
October 2010

October 2013

N am e of associated consultants, if any:


None

Approx. value o f the services provided by your firm under


the contract (in current US$)
US$ 357,843.34
N o o f months of professional staff-months provided by
asso ciated Firm(s): -

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Design Stage
Andualem H/Georgis
Bazin Haile
Nigatu Fekadu
Mulatu Tiruneh
Argaw Tilahun
Sira Bizu Akele
Getahun Worku
Hailu Mekonnen
Edris Kemal
Gossaye Gizaw

Team Leader/Professional Highway Engineer


Professional Structural Engineers
Professional Material/Geotechnical Engineer
Professional Hydrologist
Professional Contract Engineer
Electrical Engineer
Environmentalist
Traffic Engineer
Senior Surveyor
CAD Engineer

Supervision Stage
Woldu Mulugeta
Nigatu Fekdadu
Bazin Haile
Gelawdeos Tadesse
Edris Kemal
Sira Bizu Akele

Resident Engineer
Pavement Engineer
Structural Engineer
Quantity Surveyor
Chief Surveyor
Electrical Engineer

N arrative Description of Project:


The project is Detailed Engineering Design, Tender Document Preparation Contract Administration and Construction
Supervision of 8 road segments in Addis Ababa with width 10m, 15m, 20m, 30m & 40m with Asphalt Co ncrete pavement.
Status : 7 8 % Co m pleted
Description of Actual Services Provided by your Staff:
Topographic survey sub-grade, existing pavement and material investigation, preliminary and detailed engineering design
(Geometric, pavement, drainage structures and street lightings) and Construction Supervision.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
27

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Package 23 Asphalt Concrete Road Projects


BRT (Bus Rapid Transit) LINE ROADS 8.7 km
o Merkato Mosque - Teklehaimanot Church
o Teklehaimanot Church - Sengatera - Shebele Hotel
o Shebele Hotel - Kera - Gofa Mazoria
o Gofa Mazoria - Gofa Gebrael Church Roundabout
Akaki Town Main Road 1: 4.5km
Akaki Town Main Road 2: 4.3km
Bisrate Gebreil Roundabout- Abo Roundabout: 1.5km

US$ 308, 793.69

Co untry: ETHIOPIA
Lo cation within Country: Addis Ababa City

Duration o f assignment (months):


36 months

N am e of Client: Addis Ababa City Roads Authority


(AACRA)
Address:

N o o f Staff: 22
N o o f Staff Months: 227

Addis Ababa City Roads Authority


P.O.Box 9206, Addis Ababa, Ethiopia
Start Date (Month/Year): Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm under


the contract (in current US$)
October 2010
October 2013
US$ 308, 793.69
N am e of associated consultants, if any: None
N o o f months of professional staff -months provided by
asso ciated Firm(s): N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Design Stage
Hailu Mekonnen
Gebeyehu Aragaw
Kifle Bogale
Dr. Yilma Sileshi
Fisseha Tafesse
Sira Bizu Akele
Getahun Worku
Alazer Feleke
Tsegaye Hailemaryam
Yonas Haile

Team Leader/Professional Highway Engineer


Professional Structural Engineers
Professional Material/Geotechnical Engineer
Professional Hydrologist
Professional Contract Engineer
Electrical Engineer
Environmentalist
Traffic Engineer
Senior Surveyor
CAD Engineer

Supervision Stage
Mussa Sherif
Kifle Bogale
Gebeyehu Aragaw
Fekadu Abera
Tsegaye Hailemaryam
Sira Bizu Akele

Resident Engineer
Pavement Engineer
Structural Engineer
Quantity Surveyor
Chief Surveyor
Electrical Engineer

N arrative Description of Project:


The project is Detail Engineering Design, Tender document preparation and supervision of
8 road segments in Addis Ababa with width 20m, 25m, 30m & 40m Asphalt Concrete road.
Status : 7 5 % Co m pleted

Description of Actual Services Provided by your Staff:


Topographic survey sub-grade, existing pavement and material investigation, preliminary and detailed engineering design
(Geometric, pavement, drainage structures and street lightings) and Construction Supervision.
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
28

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

C.

Construction Supervision and Contract Administration


Projects

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
29

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

IMI ELKERE - CHERETI Road Up-grading Project, Section I:


(0+000 112+000)

US$ 128,160.92

Co untry: ETHIOPIA

Duration o f assignment (month): 39

Lo cation within Country: Somali National Regional State


N am e of Client: Ministry of Federal Affairs

N o o f Staff : 13

Financing Agency : Government of Ethiopia


Address:
Office of the Prime Minister
Regional Affairs Sub-sector, Somali Desk

N o o f Staff Months of the assignment: 220

Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$):

January 2001

March 2004
US$ 128,160.92

N am e of associated consultants, if any:


None

N o o f months of professional staff -months provided by


asso ciated Firm(s): -

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Gidey G/Egziabher
Getu Giza
Tewodros Zerihun
Dr. Yilma Seleshi
Redeat Kibret

Resident Engineer/Highway Engineer


Pavement Engineer
Structural Engineer
Hydrologist
Assistant Highway Engineer

N arrative Description of Project:


The project is construction supervision of Section I of the Imi Elkere - Chereti
road up-grading project. The length of the project is 112 km, and the project road
is Gravel Surfaced. The road is double lane, single carriage way.

Status : Completed

Description of Actual Services Provided by your Staff :


Detailed design review, supervision of road construction and Laboratory establishment to conduct routine soil and
concrete tests.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
30

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

IMI ELKERE - CHERETI Road Up-grading Project, Section II:


(112+000-244+000)

US$ 140,150.00

Co untry: ETHIOPIA
Duration o f assignment (month): 42
Lo cation within Country: Somali National Regional State
N am e of Client: Ministry of Federal Affairs

N o o f Staff: 13

Financing Agency : Government of Ethiopia


Address:
Office of the Prime Minister
Regional Affairs Sub-sector, Somali Desk

N o o f Staff Months: 246

Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$):

January 2001

June 2004

US$ 140,150.00

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): -

None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Tewdros Zewdu
Kifle Bogale
Tewodros Zerihun
Dr. Yilma Seleshi (Intermittent)
Andualem H/Georgis

Resident Engineer
Pavement Engineer
Structural Engineer
Hydrologist
Assistant Highway Engineer

N arrative Description of Project:


The project is construction Supervision of Section II of the Imi Elkere - Chereti
road upgrading project. The length of the project is 132 km, and the project road
is Gravel Surfaced. The road is Dual Lane, Single Carriage way.

Status: Completed

Description of Actual Services Provided by your Staff :


Detailed design review, supervision of road construction and Laboratory establishment to conduct routine soil and concrete
tests.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
31

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Shek Hussien - Micehta RR50 Road Project: Contract 1: (0+000115+000)

US$ 204,209.66

Co untry: ETHIOPIA

Duration o f assignment (month): 51

Lo catio n within Co untry: Oromia Region Bale


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 14

Financing Agency : Government of Ethiopia


Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

N o o f Staff Months: 462

Co m pletion date (Month/Year):

December 2002

Sept. 2008

N am e of associated consultants, if any:


None

Approx. value o f the services provided by your firm


under the contract (in current US$ or Euro) :
US$ 204,209.66
N o o f months of professional staff -months provided by
asso ciated Firm(s): -

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Lemma Temesgen
Abiy Girma
Samson Tewldeberhan
Fikadu Abera
Belay Sileshe
Andualem Arega
Henok Atle
Wossenu Molla

Resident Engineer
Assistant Resident Engineer
Work Inspector
Quantity Surveyor
Chief Surveyor
Chief Surveyor
Laboratory Technician
Laboratory Technician

N arrative Description of Project:


The project is Construction Supervision of the road from Mechata to Shek Hussien (Contract 1). The project length is 115
km. The road is Gravel Surfaced with Dual Lane, Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff :
Detailed design review, construction supervision and contract administration
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
32

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Shek Hussien - Micheta RR50 Road Project: Contract 2:


(115+000-170+000)

US$ 233,368.97

Co untry: ETHIOPIA

Duration o f assignment (months): 49

Lo catio n within Co untry: National Regional State of Oromia


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 14

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 530

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$):

Sept. 19, 2002

June 2008

US$ 233,368.97

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): -

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Mussa Sherif
Shimelis Getachew
Getachew Akalu
Tadelle Saddessa
Zewdu Assefa
Eskinder Shiferaw
Tamirat Yirgu
Beyene Likisa
Additional 3 Support Staff

Resident Engineer
Assistant Resident
Engineer
Chief Surveyor
Surveyor
Quantity Surveyor
Work Inspector
Laboratory Technician
Laboratory Technician

N arrative Description of Project:


The project is Construction Supervision of the road from Shek Hussien to Micheta (Contract 2.) T he project length is 55
km. The road is Gravel Surfaced, with Dual Lane, Single Carriageway. Status : Completed
Description of Actual Services Provided by your Staff :
Detailed design review, construction supervision and contract administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
33

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Dera-Magna Road Construction Project Contract 1: Dera Magna

US$ 1,264,367.82

Co untry: ETHIOPIA

Duration o f assignment (months): 41

Lo cation within Country: Arsi Zone


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 16

Financing Agency : World Bank


Address:

N o o f Staff Months: 300

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm under


the contract (in current US$ or Euro):

August 2004

October, 2009

US$ 758,628.69

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): 39

Roughton International

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Mesfin Bereket
Daniel Abebe
Solomon Tadesse
Daniel Getachew
Tahir Mohammed
Amare Kassa
Twedros Nigussie

Assistant Resident Engineer


Material Engineer
Structural Engineer
Highway Engineer
Quantity Surveyor
Sociologist
Pavement Material Engineer

N arrative Description of Project:


The project is Construction supervision of Dera-Magna Road Upgrading Project. The project length is 119.4 KM. The road is
Gravel and Pen. Macadam and Dual Lane, Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff :
Design Review. Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
34

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Nekemt- Mekenajo Road Upgrading project (Asphalt Concrete)

US$ 1,300,798.00

Co untry: ETHIOPIA

Duration o f assignment (months): 42

Lo cation within Country: West Ethiopia


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 16

Financing Agency : World Bank


Address:

N o o f Staff Months: 188

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm under


the contract (in current US$):

March 2004

April, 2009

US$ 806,494.76

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): 47

Span Consultant
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Masresha
Mulugeta Tikue
Azeb Melka
Amare Kassa

Assistant Resident Engineer


Highway Engineer
Quantity Surveyor
Sociologist

N arrative Description of Project:


The project is Construction supervision of Nekemt-Mekenajo Road Upgrading Project. The project length is 126.35 KM. The
road is Asphalt Co ncrete with Double Lane, Single Carriageway. Status : Completed

Description of Actual Services Provided by your Staff :


Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
35

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Holeta - Muger Road Upgrading Project (Asphalt Co ncrete )

US$ 800,000.00

Co untry: ETHIOPIA

Duration o f assignment (months): 25

Lo catio n within Co untry: National Regional State of Oromia


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 17

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 39

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$):

November 2005

June, 2010

US$ 560,000

N am e of associated consultants, if any:

N o o f months of professional staff-months provided by


asso ciated Firm(s): 26

Comptran (Ghana)
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Eshetu Yimer
Dr. Asnake Adamu
Tigist Woldekidan
Gelawdinos Tadesse
Eyob Tiruneh
Elisabeth Demise

Assistant Resident Engineer


Structural Engineer
Highway Engineer
Quantity Surveyor
Senior Surveyor
Surveyor

N arrative Description of Project:


The project is Construction Supervision of Holeta Muger Road Upgrading Project. The project length is 56.76 km . The
road is Asphalt Concrete, Dual lane and Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff :
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
36

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Dansha-Humera Road Upgrading Project Contract 2: Dansha Humera Construction Supervision Project

US$ 736,568.39

Co untry: ETHIOPIA

Duration o f assignment (months): 41

Lo catio n within Co untry:


North West Part of Ethiopia
N am e of Client: Ethiopian Roads Authority

N o o f Staff: 15

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 33

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$):

December 2005

April, 2009

US$ 478,769.45

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s): 42

Span Consultant
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Masresha Tsegaye
Asnake Adamu (Dr.)
Daniel Teka
Getachew Aklog
Tilahun Wudneh
Daniel Abebe
Tigist W/Kidan

Assistant Resident Engineer


Structural Engineer
Quantity Surveyor
Highway Engineer
Senior Surveyor
Geotechnical Engineer
Claim Expert

N arrative Description of Project:


The project is Construction Supervision of Dansha Humera Road Project. The project length is 117.4 km. The road is
Double Surface Treatment, with Dual lane Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff :
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
37

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Harar - Jijiga Road Upgrading Project (Asphalt Co ncrete )

US$ 706,436.78

Co untry: ETHIOPIA

Duration o f assignment (months): 41

Lo catio n within Co untry: Eastern Part of Ethiopia


N am e of Client: Ethiopian Roads Authority

N o o f Staff: 15

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 33

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

November 2005
March 2009
N am e of associated consultants, if any:

Approx. value o f the services provided by your firm


under the contract (in current US$):
US$ 445,055.17
N o o f months of professional staff -months provided by
asso ciated Firm(s): -42

Roughton International
N am e of Senior Staff (Project Director/Coordinator, Team Leader) invo lved and functions performed:
Tegegne Eshetu
Fikremariam Tadese
Mulu W/Hawariat
Andualem H/Georgis
Abera Worku
Alemayehu Demisse

Assistant Resident Engineer


Pavement Material Engineer
Structural Engineer
Highway Engineer
Senior Surveyor
Quantity Surveyor

N arrative Description of Project:


The Project is Construction Supervision of Harar Jijiga Road Upgrading Project. The project length is 106 km. The road is
Asphalt Co ncrete , Dual lane and Single carriageway. Status : Completed
Description of Actual Services Provided by your Staff :
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
38

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Azeo-Metema Road Project, Contract 1: Azezo-Gente &


Contract 2: Gente Metema (Asphalt Co ncrete )

US$ 353,973.93

Co untry: ETHIOPIA

Duration o f assignment (months): 37

ETB 5,631,790.57

Lo cation within Country: Northern Ethiopia


N am e of Client: Ethiopian Roads Authority
Financing Agency : BADEA / Saudi Fund
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

December 2006

December 2009

N am e of associated consultants, if any:

N o o f Staff: 14

N o o f Staff Months: 315

Approx. value o f the services provided by your firm


under the contract (in current US$):
300,000 USD
N o o f months of professional staff -months provided by
asso ciated Firm(s): 38

BKS Group
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Solomon Weldegzi
Daniel Abebe
Dr. Asnake Adamu
Habtom G/Medhin
Yilma Beyene
Daniel Abebe
Dr. Asnake Adamu
Edris Kamal

Ass. Resident Engineer


Pav./Materials Engineer
Structural Engineer
Surveyor
Ass. Resident Engineer
Pavement/Materials Engineer
Structural Engineer
Surveyor

N arrative Description of Project:


The project is Construction supervision of Azezo- Metema Road Upgrading Project. The project length of Contract 1:
Azezo-Gente is 87 km. The project length of Contract 2: Genete - Metema is 98 km. The road is Asphalt Concrete, Dual
Lane Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff:
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
39

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Addis Tatek Asphalt Road Project


(Periodic Maintenance Supervision)

US$ 40,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Ambo Outskirt of Addis


N am e of Client: Ethiopian Roads Authority, Alemgena District
Financing Agency : Government of Ethiopia
Address:

17 months
N o o f Staff: 4

N o o f Staff Months: 72

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$)

February 2006

June 2007

US$ 40,000.00

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Kifle Bogale
Haileyesus H/Mikael
Mekseb Asrat
Asfaw Debebe

Resident Engineer
Senior Surveyor
Works Inspector
Project Coordinator

N arrative Description of Project:


The project is Construction Supervision of Addis- Tatek Asphalt Road Periodic Maintenance Project. The project length is
13.5 km. The road is Asphalt Concrete, Dual Lane, Single Carriageway. Status : Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Design review, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
40

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Gubre Junction Bojeber Gravel Road Project


(Periodic maintenance)

US$ 40,000.00

Co untry: ETHIOPIA
Lo cation within Country: South West Ethiopia
N am e of Client: Ethiopian Roads Authority, Alemgena District

Duration o f assignment (months):


17 months

N o o f Staff: 4

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 72

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$)

February 2006

June 2007

US$ 40,000.00

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Kifle Bogale
Girma Motuma
Dawit Aberra
Asfaw Debebe

Resident Engineer
Senior Surveyor
Works Inspector
Project Coordinator

N arrative Description of Project:


The project is Construction Supervision of Gubre Junction - Bojeber Gravel Road Periodic Maintenance Project. The project
length is 54 km and the road is Gravel Surfaced, Dual Lane, Single Carriageway. Status: Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
41

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Alemketerma Degolo Gravel Road Project


(Periodic maintenance)

US$ 40,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Northern part of Ethiopia

17 months

N am e of Client: Ethiopian Roads Authority, Alemgena District

N o o f Staff: 4

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 72

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$)

February 2006

June 2007

US$ 40,000.00

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Kifle Bogale
Daniel Alemayehu
Dawit Buli
Asfaw Debebe

Resident Engineer
Senior Surveyor
Works Inspector
Project Coordinator

N arrative Description of Project:


The project is Construction Supervision of Alemketema - Degolo Gravel Road Periodic Maintenance Project. The project
length is 65 km and the road is Gravel Surfaced, Dual Lane, Single Carriageway. Status : Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
42

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Kebridehar - Shilabo Road Upgrading Project

US$ 1,200,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Somali National Regional State

31 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 16

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 478

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

April 2008

April 2011

US$ 1,200,000.00

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):--

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Yusuf Abubeker
Fekadu Abera
Belay Mulugeta
Bazin Haile
Nigatu Fekadu
Tedros Husein
Esayas Mekonnen

Resident Engineer
Assistant Resident Engineer
Pavement/Material Engineer
Structural Engineer
Geotechnical Engineer
Quantity Surveyor
Senior Surveyor

N arrative Description of Project:


The project is Construction Supervision of Kebridehar - Shilabo Road Upgrading to double surface treatment. The project
length is 105 km and the road is double Lane, Single Carriageway. Status: 54% Completed
Description of Actual Services Provided by your Staff:
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
43

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Ginir - Imi- Gode Road Project, Contract 3: Imi-Lab

US$ 1,200,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Somali National Regional State

37 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 21

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 572

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

May 2008

April 2012

US$ 1,200,000.00

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):-

None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Taddele Amsalu
Asfaw Debebe
Kifle Bogale (intermittent)
Bazin Haile (intermittent)
Daniel Abebe
Andualem H/Georgis
(intermittent)
Dawit H/Michael
Tofik Sherif
Taddele Derese
Getahun Worku

Resident Engineer/Project Coordinator/


Assistant Resident Engineer
Pavement/Material Engineer
Structural Engineer
Geotechnical Engineer
Highway Engineer
Quantity Surveyor
Senior Surveyor
Claims Expert
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Ginir - Imi- Gode Road Project, Contract 3: Imi-Lab Road. The project length
is 89 km and the road is Gravel Surfaced, Dual Lane, Single Carriageway. Status: 71% Completed
Description of Actual Services Provided by your Staff:
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
44

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Ginir - Imi- Gode Road Project, Contract 4: Lab - Gode

US$ 1,200,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):


37 months

Lo cation within Country: Somali National Regional State

N o o f Staff: 21

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia
Address:

N o o f Staff Months: 572

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

May 2008

April 2012

US$ 1,200,000.00

N am e of Associated Firm(s) if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Samson Abebayhu
Aklilu Asefa
Kifle Bogale
Bazin Haile
Daniel Abebe
Andualem H/Georgis
Zinash G/Meskel
Elias Debrework
Taddele Derese
Getahun Worku

Resident Engineer
Assistant Resident Engineer
Pavement/Material Engineer
Structural Engineer
Geotechnical Engineer
Highway Engineer
Quantity Surveyor
Senior Surveyor
Claims Expert
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Ginir - Imi- Gode Road Project, Contract 4: Lab - Gode Road. Teh project
length is 92 km and the road is Gravel Surfaced, Double Lane, and Single Carriageway. Status: 61% Completed
Description of Actual Services Provided by your Staff:
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
45

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Endeto - Gasera Road Upgrading Project

US$ 1,000,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Oromia National Regional State

36 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 21

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 341

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

April 2008

Sept 2012

US$ 1,000,000.00

N am e of Associated Firm(s) if any:


None

N o o f months of professional staff -months provided by


asso ciated Firm(s): -

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Shimelis Getachew
Getu Feyera
Kifle Bogale
Bazin Haile
Nigatu Fekadu
Andualem H/Georgis
Taddele Derese
Fissehatsion Kifleyohannes
Dawit Bekele

Resident Engineer/Project Coordinator/


Assistant Resident Engineer
Pavement/Material Engineer
Structural Engineer
Geotechnical Engineer
Highway Engineer
Contract Engineer
Quantity Surveyor
Senior Surveyor

N arrative Description of Project:


The project is Construction Supervision of the new Endeto - Gasera road. The project length is 60 km and the road is
Gravel Surfaced , double Lane, Single Carriageway. Status: 96.54% Completed
Description of Actual Services Provided by your Staff:
Design Review, Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
46

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. Value of Services (in current USD):

Alaba - Sodo - Arbaminch (Contract 1: Alaba - Humbo) Road


Rehabilitatio n Project

US$ 1,000,000.00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: SNNP Regional State

31 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 21

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 355

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. Value of Services (in current USD):

April 2008

March 2012

US$ 1,000,000.00

N am e of Associated Firm(s) if any:


None

N o o f months of professional staff -months provided by


asso ciated Firm(s):

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Woldu Mulugeta
Addisu Dagne
Sued Abdelkadir
Mulu W/Hawariat
Abiyou Gebru
Fiseha Tamirat
Negussu Alemu
Taddele Derese
Getahun Worku

Resident Engineer
Assistant Resident Engineer
Pavement/Material Engineer
Structural Engineer
Highway Engineer
Quantity Surveyor
Senior Surveyor
Claims Expert
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Alaba - Sodo - Arbaminch (Contract 1: Alaba - Humbo) Road. The project
length is 110 km and the road is Asphalt Concrete, double lane, single carriageway. Status: Completed
Description of Actual Services Provided by your Staff:
Construction Supervision and Contract Administration.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
47

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Construction Supervision of Endaselassie Dejena Dansha


Road Project Contract 1: Endaselassie Dedebit

US$ 1,152,390.16

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Tigray Regional State

6 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 20

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 542

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Jan. 2008

July 2012

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 1,152,390.16

N am e of associated consultants, if any:

N o o f months of professional staff -months provided by


asso ciated Firm(s):

None

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Lemma Temesgen
Getachew Beyecha
Zemichael Berhe
Mulu W/Hawariat
Daniel Abebe

Resident Engineer
Assistant RE
Pavement/Material Eng.
Structural Engineer
Geotechnical Engineer

Rao Bala Krishna


Michael Mulugeta
Teshome G/Michael
Taddele Derese
Getahun Worku

Highway Engineer
Quantity Surveyor
Senior Surveyor
Claim Experience
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Endaselassie Dejena Dansha Road
Project Contract 1: Endaselassie Dedebit Road. The project length is 80 km and
the road is Asphalt Concrete, Dual lane, Single carriageway.

Status : 76 %

Completed

Description of Actual Services Provided by your Staff:


Construction Supervision, Design review, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
48

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:

Approx. Value of Services (in current USD):

Adigrat Intra Town Road Upgrading Project

US$ 53,153..00

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Adigrat (Tigray Regional State)

6 months

N am e of Client: Ethiopian Roads Authority

N o o f Staff: 4

Financing Agency : Government of Ethiopia


Address:

N o o f Staff Months: 14

MoWUD (UDCBO), P.O.Box 3040


Tel: +251-11 554 0629
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

Approx. value o f the services provided by your firm


under the contract (in current US$)

Dec. 2007

May 2008

US$ 53,153.00

N am e of associated consultants, if any:

N o o f months of professional staff-months provided by


asso ciated Firm(s):

None
N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Yosuf Abubeker
Dawit Buli
Daniel Alemayehu

Resident Engineer/Highway Engineer


ARE/Quantity Surveyor
Material Inspector

N arrative Description of Project:


The project is Construction Supervision of Adigrat Intra town Asphalt Road Upgrading Project. The project length is 20 km
and the road is Asphalt Concrete, double lane and single carriageway. Status: Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
49

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:


Construction Supervision Of Mekanejo - Dembidolo Road
Upgrading Project
Contract 1: Mekenajo Ayra Road (km 0+000 - km 53+260),
Contract 2: Ayra - Chanka (km 53+260 - km 118+000) and
Contract 3: Chanka - Dembidolo (km118+000 - km 180+60).

Approx. Value of Services (in current USD):

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: Oromia Regional State

30 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : International Development Association
(IDA)
Address:

US$ 3,998,896.9

N o o f Staff: 18

N o o f Staff Months: 409

Ethiopian Roads Authority


P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

June 2011

August, 2014

N am e of associated consultants, if any:


Roughton International in JV with Beza Consulting Engineers
Plc

Approx. value o f the services provided by you r firm


under the contract (in current US$)
US$ 1,349,718.8
N o o f months of professional staff -months provided by
asso ciated Firm(s): 141

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Woldu Mulugeta
Shimelis Getachew
Samson Abebayehu
Lemma Halefome
Tigist Tesfaye
Amare Kassa
Getahun Worku
N arrative Description of Project:

Assistant Resident Engineer (1)


Assistant Resident Engineer (2)
Assistant Resident Engineer (3)
Senior Pavement/Material Engineer (1)
Highway Engineer
Sociologist
Environmentalist

The project is Construction Supervision of Mekanejo - Dembidolo Road Upgrading Project Contract 1: Mekenajo Ayra Road
(km 0+000 - km 53+260), Contract 2: Ayra - Chanka (km 53+260 - km 118+000) and Contract 3: Chanka- Dembidolo
(km118+000-km 180+60).. The roads is 180km and the upgrading of the project road constitutes mainly the improvement of
the horizontal and vertical alignment where possible, the construction of new pavement layers and placing of asphalt
concrete, upgrading of the road furniture and the rehabilitation or widening of the drainage structures. The work also
includes the construction of new culverts and the rehabilitation of the existing bridges and erosion control. Status : o ngo ing
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
50

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:


Construction Supervision of Wolkite - Hossana Road Upgrading
Project; Contract 1 and Contract 2:

Approx. Value of Services (in current USD):

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: South Nations, Nationalities and


Peoples Regional State

27 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : International Development Association
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

May 2011

August 2013

N am e of associated consultants, if any:


Comptran Engineering and Planning Associates in JV with Beza
Consulting Engineers Plc (Ethiopia) in Association with Beza
consulting Engineers (Kenya)

US$ 1,708171.9

N o o f Staff: 15
N o o f Staff Months: 290

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 701,971.88
N o o f months of professional staff -months provided by
asso ciated Firm(s): 104

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Kifle H/Michael
Samson Abebayehu
Kifle Bogale
Rajesh Kumar Jha
Gebeyehu Aragaw
Gidey G/egziabher
Amare Kassa
Nega Abrha

Assistant Resident Engineer (1)


Assistant Resident Engineer (2)
Senior Pavement/Material Engineer (1)
Highway Engineer
Structural Engineer
Geotechnical Engineer
Sociologist
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Wolkite - Hossana Road Upgrading Project; Contract 1 & Contract 2. The work
under this contract consists of upgrading of the existing road to DS3 and DS4 road standard with asphalt concrete surfacing
plus a carriageway width of 14m in town sections and 7m in rural sections. The works include earth work, construction of
pavement with asphalt concrete, repair /rehabilitation of existing bridges, construction of a new bridge, rehabilitation and
construction of drainage structures and other allied works. Status : 15% Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
51

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:


Mazoria Durame Durgi-Omo-Nda Road Project
Lot 1: Mazoria Durgi ( Km 0+000- to Km 71+200),
Contract 1 Mazoria Hadero (Km 0+000 to Km 37+500) and
Contract II Hadero Durgi (Km 37+500 to Km 71+200)

Approx. Value of Services (in current USD):

Co untry: ETHIOPIA
Lo cation within Country: South Nations, Nationalities and
Peoples Regional State

Duration o f assignment (months):

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):
September 2011

Co m pletion date (Month/Year):


October 2014

N am e of associated consultants, if any:


In Joint Venture with Beza consulting Engineers (Kenya)

US$ 928,672.35

36 months
N o o f Staff: 13
N o o f Staff Months: 331

Approx. value o f the services provided by your firm


under the contract (in current US$) U S$ 828,672.35
N o o f months of professional staff -months provided by
asso ciated Firm(s): 20

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Lemma Temesgen
Resident Engineer
Mehari Yigzaw
Assistant Resident Engineer (1)
Getu Feyera
Assistant Resident Engineer (2)
Lemma Halefome
Senior Pavement/Material Engineer
R.Bala Krishna Rao
Highway Engineer
Bazin Haile
Structural Engineer
Gidey G/egziabher
Geotechnical Engineer
Fissehatsion K/Yohanes
Quantity Surveyor(1)
Gelawdiyos Tadesse
Quantity Surveyor(2)
Abera Worku
Senior Surveyor(1)
Dawit Bekele
Senior Surveyor(2)
Fisha Tafese
Claims Expert
Getahun Worku
Environmentalist
N arrative Description of Project:
The project is Construction Supervision of Mazoria Durame Durgi-Omo-Nda Road Project Lot 1: Mazoria Durgi ( Km
0+000- to Km 71+200), Contract 1 Mazoria Hadero (Km 0+000 to Km 37+500) and Contract II Hadero Durgi (Km 37+500
to Km 71+200) Road Upgrading Project;. The work under this contract consists of upgrading of the existing road to Double
Bitumen Surfaced Treatment (DBST) surfaced road to a standard of DS4 with some modification, with 7m carriageway width
and 1.5m shoulder width on each side. Status : 1 3 % Co m pleted
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration
C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
52

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:


Sawla Maji Road Project, Contract 1: Sawla - Laska (52Km)

Approx. Value of Services (in current USD):


US$ 576,393.93

Co untry: ETHIOPIA

Duration o f assignment (months):

Lo cation within Country: South Nations, Nationalities and


Peoples Regional State

36 months

N am e of Client: Ethiopian Roads Authority


Financing Agency : Government of Ethiopia
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):

Co m pletion date (Month/Year):

August 2011

April, 2014

N o o f Staff: 10
N o o f Staff Months: 209

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 576,393.93

N o o f months of professional staff -months provided by


asso ciated Firm(s): N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions pe rformed:
N am e of associated consultants, if any:

Kifle H/Michael
Samson Abebayehu
Kifle Bogale
Emebet Welde
Gebeyehu Aragaw
Gidey G/egziabher
Gelawdios Tedesse
Dawit Bekele
Fisha Tafese
Getahun Worku

Resident Engineer
Assistant Resident Engineer
Pavement/Material Engineer (1)
Highway Engineer
Structural Engineer
Geotechnical Engineer
Quantity Surveyor
Senior Surveyor
Claims Expert
Environmentalist

N arrative Description of Project:


The project is Construction Supervision of Sawla Laska Road Upgrading Project; Contract 1 0+000-52+000Km. The work
under this contract consists of upgrading of the existing road to DS6 road standard with asphalt concrete surfacing. The
works include earth work, construction of pavement with asphalt concrete, repair /rehabilitation of existing bridges,
construction of a new bridge, rehabilitation and construction of drainage structures and other allied works.
Status : 0.6% Completed
Description of Actual Services Provided by your Staff:
Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
53

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

Assignm ent Name:


Nekempt beadle- Metu Road Upgrading Project, Contract 1:
Nekempt Bedele (96Km)
Co untry: ETHIOPIA

Approx. Value of Services (in current USD):

Lo cation within Country: Oromia Region, South west pat

33 months

N am e o f Client:

Ethiopian Roads Authority

Financing Agency: Arab Bank for Economic Development in


Africa, (BADEA), Kuwait Fund for Arab Economic Development
(KFAED), and OPEC Fund for international Development
(OFID).
Address:
Ethiopian Roads Authority
P.O.Box 1770
Tel. 251-1-15 66 03
Fax: 251-1-51 48 66
Ras Abebe Aregay Street
Addis Ababa, Ethiopia
Start Date (Month/Year):
January, 2012

Co m pletion date (Month/Year):


February, 2015

N am e of associated consultants, if any:


In Joint Venture with Beza consulting Engineers (Kenya)

US$ 1,032,836.64
Duration o f assignment (months):

N o o f Staff: 10

N o o f Staff Months: 157

Approx. value o f the services provided by your firm


under the contract (in current US$)
US$ 515,006.00
N o o f months of professional staff-months provided by
asso ciated Firm(s): 53

N am e of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed:
Muhammad Khurshid UI-Hassan
Lemma Temesgen
Kifle Bogale
R. Bala Krishna Rao
Gebeyehu Aragaw
Gidey G/egziabher
Fisseha Tefesse
Gelawdeos Tadesse
Abera Worku
Harrison Wanjohi Ngirigacha

Resident Engineer
Assistant Resident Engineer
Pavement/Material Engineer
Highway Engineer
Structural Engineer
Geotechnical Engineer
Claims Expert
Quantity Surveyor
Senior Surveyor
Environmentalist

N arrativ e Descriptio n o f P ro ject:


The project is Construction Supervision of Nekemte Bedele Upgrading Road Project; Contract 1. The work under this
contract consists of upgrading of the existing road to DS3 and DS4 road standard with asphalt concrete surfacing plus a
carriageway width of 14m in town sections and 7m in rural sections. The works include earth work, construction of
pavement with asphalt concrete, repair /rehabilitation of existing bridges, construction of a new bridge, rehabilitation and
construction of drainage structures and other allied works. Status : 1 1 % Co m pleted
Descriptio n o f Actual Serv ices P ro v ided by yo ur Staff:
Construction Supervision, Payment Certification and Contract Administration

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
54

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

D. Environmental and Social Works

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
55

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Preparation of RAP for Ribb Dam

US$ 100,000.00

Co untry: ETHIOPIA
Lo cation within Country: Amhara Regional State

Duration o f assignment (month): 4

N am e of Client: Ministry of Water Resources


Financing Agency : World Bank
Address:
Ministry of Water Resources,
Ethiopian Nile Irrigation Project
Addis Ababa, Ethiopia
Start Date (month/year):

June 2008

Co m pletion date (month/year):

October 2008

To tal No of staff-months of the assignment: 14


Approx. value o f the services provided by your firm under
the contract (in current US$):
US$ 100,000.00

N am e of associated consultants, if a ny:


-

N o o f professional staff-months provided by associated


Co nsultants:

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Amare Kassa
Melaku Abiyou
Million Gebreyes
Deepa Ananth
Tibebu Kassawar
Ermias Bekele
Tirsit Tessema

Resettlement Specialist/Team
leader
Asset Valuation Specialist
Development Expert
Communication Specialist
GIS Expert
Asst. Sociologist
Data Analyst

N arrative description of Project:


Review and assess the Resettlement Action Plan for Ribb Dam.

Status : Completed

Description of actual services provided by your staff within the assignment:


Review and assess the Resettlement Action Plan, Action plan in consultation with the affected people of the immediate
construction works, Implementation of comprehensive RAP.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
56

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:

Approx. value o f the contract (in current US$ or Euro):

Environmentalist and Social Management Framework


(ESMF) and Resettlement Rehabilitation Policy Framework
(RPF)

US$ 27,694.71

Co untry: ETHIOPIA

Duration o f assignment (month): 2

Lo cation within Country:


N am e of Client: Ethiopian Electric Power Corporation

To tal No of staff-months of the assignment: 12

Financing Agency : Government of Ethiopia


Address:
Ethiopian Electric Power Corporation
Universal Electric Access Program
P.O. Box 1233
Tel: 251 552 6987
Email <ruralpro@ethionet.et>
Addis Ababa, Ethiopia
Start Date (month/year):

November 2005

Co m pletion date (month/year):

December 2005

N am e of associated consultants, if any:


-

Approx. value o f the services provided by your firm under


the contract (in current US$):
US$ 27,694.71

N o o f professional staff-months provided by associated


Co nsultants:

N am e of Senior professional staff o f yo ur firm inv o lv ed


and func tio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o rdinato r, Team
Leader):
Taddele Debella
Getahun Worku
Amare Kassa

Environmentalist
Environmentalist
Sociologist

N arrative description of Project:


Environmentalist and Social Management Framework (ESMF) and Resettlement Rehabilitation Policy Framework (RPF)

Status: Completed
Description of actual services provided by your staff within the assignment:
Environmentalist and Social Management Framework (ESMF) and Resettlement Rehabilitation Policy Framework (RPF)

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
57

Beza Consulting Engineers Plc (Ethiopia)


In Sub-Consulting with
Beza Consulting Engineers Uganda Limited

Section 2: Consultants Organization and Experience

P ro ject Name:
Consultancy
Services
for
Development Study (Lot 3)

Approx. value o f the contract (in current US$ or Euro):


the

Wereda

Integrated

Co untry: ETHIOPIA

US$ 446,096.65

Duration o f assignment (month): 15

Lo cation within Country: Central Ethiopia


N am e of Client: Ethiopian Electric Power Corporation

To tal No of staff-months of the assignment: 196

Financing Agency : World Bank

Address:

Approx. value o f the services provided by your firm under


the contract (in current US$):

Ethiopian Roads Authority


P.O.Box 1770
Addis Ababa, Ethiopia

US$ 175,167.81

Start Date (month/year):

March 2006

Co m pletion date (month/year):

May 2007

N am e of associated consultants, if any:


Span Consultants Pvt. Ltd.
New Delhi, India

N o o f professional staff-months provided by associated


Co nsultants: 107

N am e of Senior professional staff o f yo ur firm inv o lv ed


and functio ns perfo rm ed (indicate m o st significant
pro files such as P ro ject Directo r/Co o r dinato r, Team
Leader):
Arebo Sambi
Kedir Mohamed
Zelleke Dagnachew (Dr.)
Girmay Berhe Tsadik
Wubeshet Demeke

Environmentalist
Agricultural Specialist
Livestock Expert
Public Education Expert
Public Health Specialist

N arrative description of Project:


Woreda Integrated Development Study (Lot3) consists of various topographical and demographical Survey, Socio Economic Survey. Status: Completed
Description of actual services provided by your staff within the assignment:
The Consultant Conducted topographical survey of the study area using Global Positioning System (GPS) which requires
current standards of GIS system for better correlation. All relevant positions and location of physical and demographic
features have been properly identified and fixed. In addition, the consultant collected representative sample of socio economic survey at Woreda Level, Kebele Level and Household Level to establish the development demand pattern in
general and transport demand pattern in particular.

C onsultancy Services for Prefeasibility Study to Assess the Viability of Providing Road Infr astr uctur e A r ound the
periphery (shores) Lake Victoria and Lake Albert
58