Air Emission Design Limits- AAL Field development

RI
Reg'n

AAL
Proposed
Design Limit

Unit

Ref. Reg./
KepMen

Applicable
for Project

Opacity

40%

40%

129/ 2003

Yes

Volume

No
Regn

MMSCFD

No Regn

Yes

PM-10

300

300

mg/Nm3

129/ 2003

Yes

SO2
NO2

1200
1400

1200
1400

mg/Nm3
mg/Nm3

129/ 2003
129/ 2003

Yes
Yes

Opacity

40%

40%

129/ 2003

Yes

NO2

1000

1000

mg/Nm3

129/ 2003

Yes

Opacity

40%

40%

129/ 2003

Yes

H2S

100

100

mg/Nm3

129/ 2003

Yes

Can be achieved if sweet gas.

HC

5000

5000

mg/Nm3

129/ 2003

Yes

Only apply for 24 hrs.


continuous venting; Continuous
venting is not recommended

Source

Parameter

Flare Stack

Boiler (Oil Fuel)

Boiler
(Gas Fuel)
Venting
(Note 1, 2)

Remark
Can be achieved w/ Atomize
Nozzle

PM-10 is Particulate Matter Less


Than 10 Micron

Able to be achieved w/o Low


NOx Burner

Liquids and Solids Design Limits AAL Field development

Source

Parameter

RI
Regn

AAL
Proposed
Design Limit

Unit

Ref.
Reg.
KepMen

Applicable
for Project

Remark

Produced
Water

Oil & Grease

50

50

mg/l

42/ 1996

Yes

Can be achieved
w/ existing tech. of
Hydrocyclone

pH

6 to 9

6 to 9

42/ 1996

Yes

112/
2003

Domestic
Waste

Haz Waste
Generation

pH

6 to 9

6 to 9

TSS

100

100

mg/l

BOD

100

100

mg/l

Oil & Grease

10

10

mg/l

Amount/
Volume

No
Regn

%
Reduction

112/
2003
112/
2003
112/
2003

None

Yes

Can be achieved
w/ existing tech. of
Domestic Waste
Treatment

Yes

As Above

Yes

As Above

Yes

As Above

Yes

Ops are req'd to


have Haz Waste
Mgmt Plan in
place before 1st
Prod for Tank
Cleaning; Prod
Sand; Well
Servicing