A - DEMOLISHER

A001 Brick work in cement, demolished bricks stacked and debris cleared.
Per 2.83 Cu.m.
2.50 Day

Labourer
Allow for Scaffolding

650.00

Sub total
O.H. 14%
Total
Say Per Cu.m

1,625.00
150.00
1,775.00
248.50
2,023.50
714.59
714.00

A002 Brick work in lime, demolished bricks stacked and debris cleared.
Per 2.83 Cu.m.
2.00 Day

Labourer
Allow for Scaffolding

650.00

Sub total
O.H. 14%
Total
Say Per Cu.m

1,300.00
150.00
1,450.00
203.00
1,653.00
583.75
583.00

A003 Cabook masonry, in lime mortar demolished cabook stacked and debris cleared.
Per 2.83 Cu.m.
1.75 Day

Labourer
Allow for Scaffolding

650.00

Sub total
O.H. 14%
Total
Say Per Cu.m

1,137.50
150.00
1,287.50
180.25
1,467.75
518.33
518.00

A004 Rubble masonry in cement, demolished, rubble staked and debris cleared.
Per 2.83 Cu.m.
2.50 Day

Labourer

650.00

Sub total
O.H. 14%
Total
Say Per Cu.m

1,625.00
1,625.00
227.50
1,852.50
654.21
654.00

A005 Rubble masonry in lime, demolished, rubble staked and debris cleared.
Per 2.83 Cu.m.
2.00 Day

Labourer

650.00

Sub total
O.H. 14%
Total
Say Per Cu.m
275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 1 of 263

1,300.00
1,300.00
182.00
1,482.00
523.36
523.00

A006 Cement concrete in floor slab (150mm) demolished, and debris cleared away. (unreinforced)
Per 9.29 Sq.m.
4.00 Day
0.50 Day

Digging - Labourer
Collecting and transporting
Labourer

650.00

2,600.00

650.00

325.00
2,925.00
409.50
3,334.50
358.92
358.00

Sub total
O.H. 14%
Total
Say Per Sq.m
A007 Cement concrete in floor slab (75mm) demolished, and debris cleared away. (unreinforced)
Per 9.29 Sq.m.
2.00 Day
0.25 Day

Digging - Labourer
Collecting and transporting
Labourer

650.00

1,300.00

650.00

162.50
1,462.50
204.75
1,667.25
179.46
179.00

Sub total
O.H. 14%
Total
Say Per Sq.m

A008 Cement concrete, reinforced, demolished in suspended floors 100mm, reinforcement removed and
debris cleared.
Per 9.29 Sq.m.
6.00 Day
0.50 Day

Digging - Labourer
Collecting and transporting
Labourer

650.00

3,900.00

650.00

325.00
4,225.00
591.50
4,816.50
518.44
518.00

Sub total
O.H. 14%
Total
Say Per Sq.m
A009 Drains brick demolished and debris cleared.
Per 3.05 L.m.
2.60 hour

Labourer

81.25

211.25
211.25
29.58
240.83
79.01
79.00

81.25

325.00
162.50
487.50
68.25

Sub total
O.H. 14%
Total
Say Per L.m
A010 Floors brick paved, demolished and debris cleared away. (75mm thick floor).
Per 9.29 Sq.m.
4.00 hour

Labourer
Add. 50% for extra difficulty

@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 2 of 263

Total
Say Per Sq.m

555.75
59.82
59.00

A011 Rendering, cement, chipped and debris cleared away from brick walls and floors.
Per 9.29 Sq.m.
9.00 hour

Labourer
Allow for stages

81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

731.25
25.00
756.25
105.88
862.13
92.80
92.00

A012 Rendering, cement, chipped and debris cleared away from cement concrete walls and floors.
Per 9.29 Sq.m.
9.00 hour

Unskilled Labour
Add 50%

81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

731.25
365.63
1,096.88
153.56
1,250.44
134.60
134.00

A013 Lime plastering chipped and debris cleared away.


Per 9.29 Sq.m.
3.00 hour

Labourer
Allow for stages.

81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

243.75
50.00
293.75
41.13
334.88
36.05
36.00

A014 Cement plastering, chipped and debris cleared away.


Per 9.29 Sq.m.
1.125 Day

Labourer
Allow for scaffolding

650.00

Sub total
O.H. 14%
Total
Say Per Sq.m

731.25
150.00
881.25
123.38
1,004.63
108.14
108.10

A015 Cement plastering, soffit chipped and debris cleared away.


Per 9.29 Sq.m.
1.125 Day

Labourer
Add 25% for extra difficulty
Allow for scaffolding

650.00

Sub total
275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 3 of 263

731.25
182.81
150.00
1,064.06

O.H. 14%
Total
Say Per Sq.m

148.97
1,213.03
130.57
130.00

A016 Tiles, glazed demolished and debris cleared.


Per 9.29 Sq.m.
2.00 Day

Labourer

650.00

Sub total
O.H. 14%
Total
Say Per Sq.m

1,300.00
1,300.00
182.00
1,482.00
159.52
159.00

A017 Water proof treatment of bitumen taken off from flat roof and debris cleared away.
Per 9.29 Sq.m.
2.00 Day

Labourer

650.00

Sub total
O.H. 14%
Total
Say Per Sq.m

1,300.00
1,300.00
182.00
1,482.00
159.52
159.00

A018 Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls of single storey
building and stacked.
Per 9.29 Sq.m.
3.00 hour
2.00 hour

Labourer
Black Smith
Allow for scaffolding.

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say Per Sq.m

243.75
250.00
150.00
643.75
90.13
733.88
78.99
78.90

A019 Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls of two storey
building and stacked.
Per 9.29 Sq.m.
3.00 hour
2.00 hour
0.50 hour

Labourer
Black Smith
Add- for extra height- Labour
Allow for scaffolding.

@
@
@

81.25
125.00
81.25

Sub total

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 4 of 263

243.75
250.00
40.63
250.00
784.38

O.H. 14%
Total
Say Per Sq.m

109.81
894.19
96.25
96.20

A020 Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls of three storey
building and stacked.
Per 9.29 Sq.m.
3.00 hour
2.00 hour
0.50 hour

Labourer
Black Smith
Add- for extra height- Labour
Allow for scaffolding.

@
@
@

81.25
125.00
81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

243.75
250.00
40.63
350.00
884.38
123.81
1,008.19
108.52
108.50

A021 Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and timber, stacking serviceable
material and clearing debris in single storey buildings.
Per 9.29 Sq.m.
6.00 hour
2.00 hour

Labourer
Carpenter
Allow for scaffolding.

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say Per Sq.m

487.50
250.00
180.00
917.50
128.45
1,045.95
112.59
112.00

A022 Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and timber, stacking serviceable
material and clearing debris in two storey buildings.
Per 9.29 Sq.m.
6.00 hour
2.00 hour
2.00 hour

Labourer
Carpenter
Add- for extra height- 2 Labours 1 hr.
Allow for scaffolding.
Sub total
O.H. 14%
Total

@
@
@

81.25
125.00
81.25

Say Per Sq.m

487.50
250.00
162.50
250.00
1,150.00
161.00
1,311.00
141.11
141.00

A023 Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and timber, stacking serviceable
material and clearing debris in three storey buildings.
Per 9.29 Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 5 of 263

6.00 hour
2.00 hour
4.00 hour

Labourer
Carpenter
Add- for extra height-4 Labours 1 hr.
Allow for scaffolding.
Sub total
O.H. 14%
Total

@
@
@

81.25
125.00
81.25

Say Per Sq.m

487.50
250.00
325.00
350.00
1,412.50
197.75
1,610.25
173.33
173.00

A024 Roof, removing tiles and timber, stacking serviceable material and clearing debris in single storeyed
buildings
Per 9.29 Sq.m.
1.00 Day
0.25 Day

Labourer
Carpenter
Allow for stages

@
@

650.00
1,000.00

Sub total
O.H. 14%
Total
Say Per Sq.m

650.00
250.00
50.00
950.00
133.00
1,083.00
116.57
116.00

A025 Roof, removing tiles and timber, stacking serviceable material and clearing debris in two storeyed
buildings
Per 9.29 Sq.m.
1.00 Day
0.25 Day
0.50 Day

Labourer
Carpenter
Add- for extra -2 Labours 1/4 day
Allow for scaffolding.
Sub total
O.H. 14%
Total

@
@
@

650.00
1,000.00
650.00

Say Per Sq.m

650.00
250.00
325.00
250.00
1,475.00
206.50
1,681.50
181.00
180.00

A026 Roof, removing tiles and timber, stacking serviceable material and clearing debris in three storeyed
buildings
Per 9.29 Sq.m.
1.00 Day
0.25 Day
1.00 Day

Labourer
Carpenter
Add- for extra -4 Labours 1/4 day
Allow for scaffolding.
Sub total
O.H. 14%
Total

@
@
@

650.00
1,000.00
650.00

Say Per Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 6 of 263

650.00
250.00
650.00
350.00
1,900.00
266.00
2,166.00
233.15
233.00

A027 Tiles Calicut or half round, removed from roof of single storey buildings and stacked at site.
Per 9.29 Sq.m.
4.00 hour

Labourer
Allow for stages

81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

325.00
50.00
375.00
52.50
427.50
46.02
46.00

A028 Tiles Calicut or half round, removed from roof of two storey buildings and stacked at site.
Per 9.29 Sq.m.
4.00 hour
2.00 hour

Labourer
Add 2 labourers 1 hr.
Allow for scaffolding

@
@

81.25
81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

325.00
162.50
180.00
667.50
93.45
760.95
81.91
81.90

A029 Tiles Calicut or half round, removed from roof of three storey buildings and stacked at site.
Per 9.29 Sq.m.
4.00 hour
4.00 hour

Labourer
Add 4 labourers 1 hr.
Allow for scaffolding

@
@

81.25
81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

325.00
325.00
350.00
1,000.00
140.00
1,140.00
122.71
122.70

A030 Ceiling, existing, removed materials stacked and debris cleared.


Per 9.29 Sq.m.
1.50 hour
3.00 hour

Carpenter
Labourer
Allow for scaffolding.

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

187.50
243.75
180.00
611.25
85.58
696.83
75.01
75.00

A031 Ceiling asbestos removing including timber frame work, stacking serviceable materials and debris
cleared away in single storeyed building.
275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 7 of 263

Ceiling asbestos removing including timber frame work, stacking serviceable materials and debris
cleared away in single storeyed building.
Per 9.29 Sq.m.
1.00 Day
1.00 Day

Carpenter
Labourer
Allow for scaffolding

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say Per Sq.m

1,000.00
650.00
180.00
1,830.00
256.20
2,086.20
224.56
224.00

A032 Ceiling asbestos removing including timber frame work, stacking serviceable materials and debris
cleared away in two storeyed building.
Per 9.29 Sq.m.
1.00 Day
1.00 Day
0.50 Day

Carpenter
Labourer
Add 2 labourers 1/4 day
Allow for scaffolding

@
@
@

1,000.00
650.00
650.00

Sub total
O.H. 14%
Total
Say Per Sq.m

1,000.00
650.00
325.00
180.00
2,155.00
301.70
2,456.70
264.44
264.00

A033 Valance / barge boarding removed, materials stacked and debris cleared away in single storeyed
building.
Per 12.19 L.m.
2.00 hour

Labourer
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say Per L.m

162.50
180.00
342.50
47.95
390.45
32.03
32.00

A034 Valance / barge boarding removed, materials stacked and debris cleared away in two storeyed
building.
Per 12.19 L.m.
3.00 hour

Labourer
Allow for scaffolding

81.25

243.75
250.00
493.75
69.13
562.88
46.17
46.10

650.00

650.00

Sub total
O.H. 14%
Total
Say Per L.m
A035 Door or window, size up to 3.7 sq.m removed from existing walls and stacked.
Per No.
1.00 Day

Labourer ( 2 lab. 1/2 day)

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 8 of 263

Sub total
O.H. 14%
Total

650.00
91.00
741.00
741.00

Say Per No.

A036 Door or window, size over 3.7 sq.m removed from existing walls and stacked.
Per No.
1.50 Day

Labourer ( 3 lab. 1/2 day)

650.00

Sub total
O.H. 14%
Total
Say Per No.

975.00
975.00
136.50
1,111.50
1,111.00

A037 Door or window, sash only, size up to 3.7 sq.m removed from existing walls and stacked.
Per No.
0.50 hour
0.50 hour

Carpenter
Labourer

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say Per No.

40.63
62.50
103.13
14.44
117.56
117.00

A038 Door or window, sash only, size over 3.7 sq.m removed from existing walls and stacked.
Per No.
0.75 hour
0.75 hour

Carpenter
Labourer

@
@

81.25
125.00

60.94
93.75
154.69
21.66
176.34
176.00

125.00

187.50
187.50
26.25
213.75
383.75
383.00

Sub total
O.H. 14%
Total
Say Per No.

A039 Glass panes in door, window and fanlights removed and stacked.
Per 0.557 Sq.m - 8 panes
1.50 hour

Carpenter

@
Sub total
O.H. 14%
Total

Say Per Sq.m


A040 Partitions removed and stacking at site, including making good to walls and floors.
Per 9.755 Sq.m - (4.572x2.134)
1.00 Day
0.25 Day
2.00 Day

Carpenter
Mason
Labourer
Allow for stages
Allow for cement, sand etc.

@
@
@

1,000.00
1,000.00
650.00

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 9 of 263

1,000.00
250.00
1,300.00
100.00
100.00

Sub total
O.H. 14%
Total
Say Per Sq.m

2,750.00
385.00
3,135.00
321.37
321.00

A041 Expanded metal removed from existing frames and stacked.


Per 0.836 Sq.m -(0.914x0.914)
1.00 hour
1.00 hour

Carpenter
Labourer

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say Per Sq.m

81.25
125.00
206.25
28.88
235.13
281.25
281.00

A042
Down pipes, 100mm to 150mm dia G.I. old or decayed, removed from existing building and stacked.
Per 3.658 L.m.
1.00 hour

Labourer

81.25

81.25
81.25
11.38
92.63
25.32
25.30

81.25

162.50
180.00
342.50
47.95
390.45
32.03
32.00

81.25

162.50
81.25
250.00
493.75
69.13
562.88
46.17
46.10

81.25

162.50

Sub total
O.H. 14%
Total
Say Per L.m
A043 Gutter, eaves, removed and stacked from roof of single storeyed building.
Per 12.19 L.m.
2.00 hour

Labourer
Allow for scaffolding

@
Sub total
O.H. 14%
Total
Say Per L.m

A044 Gutter, eaves, removed and stacked from roof of two storeyed building.
Per 12.19 L.m.
2.00 hour

Labourer
Add 50%
Allow for scaffolding

Sub total
O.H. 14%
Total
Say Per L.m
A045 Gutter, eaves, removed and stacked from roof of three storeyed building.
Per 12.19 L.m.
2.00 hour

Labourer

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 10 of 263

Add 100%
Allow for scaffolding

162.50
350.00
675.00
94.50
769.50
63.12
63.10

Sub total
O.H. 14%
Total
Say Per L.m

A046 Gate sash removed and stacked after demolishing cement concrete blocks or removing posts and
separating pintles. ( Demolishing brick work where necessary paid for separately)
Per No.
1.00 Day

Labourer ( 2 lab. 1/2 day)

650.00

Sub total
O.H. 14%
Total
Say Per No.

650.00
650.00
91.00
741.00
741.00

A047 Fence uprooted, barbed wire rolled up and all materials stacked (length of the fencing to be
measured).
Per 15.24 L.m.
3.00 hour
2.00 Day

Labourer - Digging up 6 posts


Labourer - Dismantling and rolling
Sub total
O.H. 14%
Total

@
@

81.25
650.00

Say Per L.m.

243.75
1,300.00
243.75
34.13
277.88
18.23
18.20

A048 Cadjan roofing or walling dismantled, timber stacked and debris cleared.
Per 9.29 Sq.m.
0.50 hour
1.00 hour

Thatcher
Labourer

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say Per Sq.m

62.50
81.25
143.75
20.13
163.88
17.64
17.60

A049 Cutting down trees girth not exceeding 600mm, grubbing up roots & fill in excavation
Per No.
5.00 hour

Labourer

81.25

Sub total
O.H. 14%
Total
Say Per No.

406.25
406.25
56.88
463.13
463.00

A050 Cutting down trees uprooting and grubbing girth exceeding 600mm but less than 900mm excavation
filled in earth logging and stacking.
275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 11 of 263

Cutting down trees uprooting and grubbing girth exceeding 600mm but less than 900mm excavation
filled in earth logging and stacking.
Per No.
7.00 hour

Labourer

81.25

Sub total
O.H. 14%
Total
Say Per No.

568.75
568.75
79.63
648.38
648.00

A051 Cutting down trees uprooting and grubbing girth exceeding 900mm but less than 1200mm excavation
filled in earth, logging and stacking.
Per No.
16.00 hour

Labourer

81.25

Sub total
O.H. 14%
Total
Say Per No.

1,300.00
1,300.00
182.00
1,482.00
1,482.00

A052 Cutting down trees, uprooting and grubbing girth exceeding 1200mm excavation filled in earth, rate to
include logging and stacking.
Per No.
20.00 hour

Labourer

81.25

Sub total
O.H. 14%
Total
Say Per No.

275544406.xls - DEPARTMENT OF BUILDINGS - A - Page No: 12 of 263

1,625.00
1,625.00
227.50
1,852.50
1,852.00

B - EXCAVATOR
B001 Drains, earth, in any soil except rock requiring blasting cut to gradient and shaped as directed, soil
deposited within site.
Per 2.83 Cu.m
11.00 hour
0.33

Labourer
Basket

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

893.75
41.25
935.00
130.90
1,065.90
376.42
376.00

B002 Excavation for foundation in any material except rock requiring blasting part return fill in and ram and
surplus disposed within the site as directed.
Per 2.83 Cu.m
13.00 hour
0.33

Labourer
Basket

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,056.25
41.25
1,097.50
153.65
1,251.15
441.84
441.00

B003 Excavation for Well or Pit up to 1.5 m from ground level in any material except rock requiring blasting part
return fill in and ram and surplus disposed within the site as directed.
Per 2.83 Cu.m
1.50 Day
0.33

Labourer
Basket

@
@

650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

975.00
41.25
1,016.25
142.28
1,158.53
409.13
400.00

B004 Excavation for Well or Pit, from 1.5 m to 3.0 m, in any material except rock requiring blasting part return fill
in and ram and surplus disposed within the site as directed.
Per 2.83 Cu.m
1.50 Day
0.50 hour
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

275544406.xls - DEPARTMENT OF BUILDINGS - B - Page No: 13 of 263

975.00
325.00
41.25
1,341.25
187.78
1,529.03
539.97
530.00

B005 Excavation for Well or Pit, from 3.0 m to 4.5 m, in any material except rock requiring blasting part return fill
in and ram and surplus disposed within the site as directed.
Per 2.83 Cu.m
1.50 Day
1.00 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

975.00
650.00
41.25
1,666.25
233.28
1,899.53
670.81
670.00

B006 Excavation for Well, from 4.5 m to 6.0 m, in any material except rock requiring blasting part return fill in and
ram and surplus disposed within the site as directed.
Per 2.83 Cu.m
1.50 Day
1.50 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

975.00
975.00
41.25
1,991.25
278.78
2,270.03
801.65
800.00

B007 Excavation for Well, from 6.0 m to 7.5 m, in any material except rock requiring blasting part return fill in and
ram and surplus disposed within the site as directed.
Per 2.83 Cu.m
1.50 Day
2.00 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

975.00
1,300.00
41.25
2,316.25
324.28
2,640.53
932.49
930.00

B008 Excavation for Well or Pit, from 1.5 m to 3.0 m, in Soft rock, except rock requiring blasting, surplus
disposed within the site as directed.
Per 2.83 Cu.m
3.00 Day
1.00 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - B - Page No: 14 of 263

650.00
650.00
125.00

1,950.00
650.00
41.25
2,641.25
369.78
3,011.03

Say per Cu.m

1,063.34
1,060.00

B009 Excavation for Well or Pit, from 3.0 m to 4.5 m, in Soft rock, except rock requiring blasting, surplus
disposed within the site as directed.
Per 2.83 Cu.m
3.00 Day
1.50 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,950.00
975.00
41.25
2,966.25
415.28
3,381.53
1,194.18
1,190.00

B010 Excavation for Well, from 4.5 m to 6.0 m, in Soft rock, except rock requiring blasting, surplus disposed
within the site as directed.
Per 2.83 Cu.m
3.00 Day
2.00 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,950.00
1,300.00
41.25
3,291.25
460.78
3,752.03
1,325.02
1,320.00

B011 Excavation for Well, from 6.0 m to 7.5 m, in Soft rock, except rock requiring blasting, surplus disposed
within the site as directed.
Per 2.83 Cu.m
3.00 Day
2.50 Day
0.33

Labourer
Add extra labourer
Basket

@
@
@

650.00
650.00
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,950.00
1,625.00
41.25
3,616.25
506.28
4,122.53
1,455.86
1,450.00

B012 Excavation & levelling site in any material except rock requiring blasting surplus disposed including
transport up to 0.4Km.depositing and levelling.
Per 2.83 Cu.m
8.00 hour
0.33
0.50 hour

Labourer
Basket
Tractor

@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - B - Page No: 15 of 263

81.25
125.00
550.00

650.00
41.25
275.00

Sub total
O.H. 14%
Total
Say per Cu.m

966.25
135.28
1,101.53
389.00
389.00

B013 Filling under floors with gravel or other approved quality of filling, spread, watered and well rammed in
75mm layers (Materials available at site.)
Per 2.83 Cu.m
14.00 hour
0.33

Labourer
Basket

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,137.50
41.25
1,178.75
165.03
1,343.78
474.55
474.00

B014 Filling under floors with gravel or other approved quality filling spread watered and well rammed in 75mm
layers. (1.6Km) transported.
Per 2.83 Cu.m
2.00 Day
2.83 Cu.m.
0.33

Labourer
Gravel / earth with 1.6km transport
Compensation for earth
Basket

@
@

650.00
800.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,300.00
2,264.00
226.40
41.25
3,831.65
536.43
4,368.08
1,542.58
1,542.00

B015 Filling under floors with gravel or other approved quality of filling, spread, watered and rammed in 75mm
layers (6.4 km transport).
Per 2.83 Cu.m
2.00 Day
2.83 Cu.m.
0.33

Labourer
Gravel / earth with 1.6km transport
Compensation for earth
Basket
Allow for Extra Transport

@
@

650.00
800.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,300.00
2,264.00
226.40
41.25
319.41
4,151.06
581.15
4,732.21
1,671.17
1,671.00

B016 Filling around the building with gravel or other approved quality filling spread watered and well rammed.
(1.6Km) transported.
Per 2.83 Cu.m
1.00 Day
2.83 Cu.m.

Labourer
Gravel / earth with 1.6km transport
Compensation for earth

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - B - Page No: 16 of 263

650.00
800.00

650.00
2,264.00
226.40

0.33

Basket

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

41.25
3,181.65
445.43
3,627.08
1,280.89
1,280.00

B017 Filling around the building with gravel or other approved quality of filling, spread, watered and well rammed.
(6.4 km transport).
Per 2.83 Cu.m
1.00 Day
2.83 Cu.m.
0.33

Labourer
Gravel / earth with 1.6km transport
Compensation for earth
Basket
Allow for Extra Transport

@
@

650.00
800.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

275544406.xls - DEPARTMENT OF BUILDINGS - B - Page No: 17 of 263

650.00
2,264.00
226.40
41.25
319.41
3,501.06
490.15
3,991.21
1,409.48
1,409.00

C - CONCRETER
C001 Cement concrete 1:3:6(50), above 3 Cu.m.
Per 2.83 Cu.m
8.00
1.00
11.25
1.59
2.83

Day
Day
Bag
Cu.m.
Cu.m.

0.67 No.

Labourer
Mason
Cement
Sand
Metal 50mm
Allow for water
Basket

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
3,625.00

Say per Cu.m

5,200.00
1,000.00
8,426.25
3,180.00
10,258.75
50.00
83.75
28,198.75
3,947.83
32,146.58
11,352.47
11,350.00

125.00

Say per Cu.m

28,198.75
1,550.00
29,748.75
4,164.83
33,913.58
11,976.49
11,970.00

Sub total
O.H. 14%
Total

C002 Cement concrete 1:3:6(50), up to 3 Cu.m.


Per 2.83 Cu.m
As in item C001
Add 25% of cost of labour
Sub total
O.H. 14%
Total

C003 Cement concrete 1:3:6(40), above 3 Cu.m.


Per 2.83 Cu.m
8.00
1.00
11.25
1.59
2.83

Day
Day
Bag
Cu.m.
Cu.m.

0.67 No.

Labourer
Mason
Cement
Sand
Metal 40mm
Allow for water
Basket

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
4,085.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

5,200.00
1,000.00
8,426.25
3,180.00
11,560.55
50.00
83.75
29,500.55
4,130.08
33,630.63
11,876.56
11,870.00

C004 Cement concrete 1:3:6(40), up to 3 Cu.m.


Per 2.83 Cu.m
As in item C003
Add 25% of cost of labour
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 18 of 263

29,500.55
1,550.00
31,050.55
4,347.08
35,397.63
12,500.57

Say per Cu.m

12,500.00

C005 Cement concrete 1:3:6(25), above 3 Cu.m.


Per 2.83 Cu.m
8.00
1.00
11.25
1.59
2.83

Day
Day
Bag
Cu.m.
Cu.m.

0.67 No.

Labourer
Mason
Cement
Sand
Metal 25mm
Allow for water
Basket

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
4,155.00

Say per Cu.m

5,200.00
1,000.00
8,426.25
3,180.00
11,758.65
50.00
83.75
29,698.65
4,157.81
33,856.46
11,956.32
11,950.00

125.00

Say per Cu.m

29,698.65
1,550.00
31,248.65
4,374.81
35,623.46
12,580.33
12,580.00

Sub total
O.H. 14%
Total

C006 Cement concrete 1:3:6(25), up to 3 Cu.m.


Per 2.83 Cu.m
As in item C005
Add 25% of cost of labour
Sub total
O.H. 14%
Total

C007 Cement concrete 1:2 1/2:5(25), above 3 Cu.m.


Per 2.83 Cu.m
8.00
1.00
13.60
1.70
2.83

Day
Day
Bag
Cu.m.
Cu.m.

0.67 No.

Labourer
Mason
Cement
Sand
Metal 25mm
Allow for water
Basket

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
4,155.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

5,200.00
1,000.00
10,186.40
3,400.00
11,758.65
50.00
83.75
31,678.80
4,435.03
36,113.83
12,753.50
12,750.00

C008 Cement concrete 1:2 1/2:5(25), up to 3 Cu.m.


Per 2.83 Cu.m
As per in Item C007
Add 25% of cost of labour
Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 19 of 263

31,678.80
1,550.00
33,228.80
4,652.03

Total

37,880.83
13,377.51
13,370.00

Say per Cu.m


C009 Cement concrete 1:2:4(20), above 3 Cu.m. - Ground floor
Per 2.83 Cu.m
8.00
1.00
16.00
1.70
2.83

Day
Day
Bag
Cu.m.
Cu.m.

0.67 No.

Labourer
Mason
Cement
Sand
Metal 20mm
Allow for water
Basket

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
5,000.00

125.00

Sub total
O.H. 14%
Total
Say per Cu.m

5,200.00
1,000.00
11,984.00
3,400.00
14,150.00
50.00
83.75
35,867.75
5,021.49
40,889.24
14,439.92
14,430.00

C010 Cement concrete 1:2:4(20), above 3 Cu.m. - First floor


Per 2.83 Cu.m

2.00 Day

As per Item No C009


Labourer

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

35,867.75
1,300.00
37,167.75
5,203.49
42,371.24
14,963.29
14,960.00

C011 Cement concrete 1:2:4(20), above 3 Cu.m. - Second floor


Per 2.83 Cu.m

5.00 Day

As per Item No C009


Labourer

@
Sub total
O.H. 14%
Total
Say per Cu.m

650.00

35,867.75
3,250.00
39,117.75
5,476.49
44,594.24
15,748.33
15,740.00

C012 Cement concrete 1:2:4(20), up to 3 Cu.m. - Ground Floor


Per 2.83 Cu.m
As per in Item C009
Add 25% of cost of labour
Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 20 of 263

35,867.75
1,550.00
37,417.75
5,238.49

Total

42,656.24
15,063.93
15,060.00

Say per Cu.m

C013 Cement concrete 1:2:4(20), up to 3 Cu.m. - First Floor


Per 2.83 Cu.m

2.00 Day

As per in Item C009


Add 25% of cost of labour
Labourer

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

35,867.75
1,550.00
1,300.00
38,717.75
5,420.49
44,138.24
15,587.30
15,580.00

C014 Cement concrete 1:2:4(20), up to 3 Cu.m. - Second Floor


Per 2.83 Cu.m

5.00 Day

As per in Item C009


Add 25% of cost of labour
Labourer

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

35,867.75
1,550.00
3,250.00
40,667.75
5,693.49
46,361.24
16,372.34
16,370.00

C015 75 mm thick floor Cement concrete 1:3:6(50).


Per 9.29 Sq.m
2.00
0.75
2.85
0.40
0.71

Day
Day
Bag
Cu.m.
Cu.m.

Labourer
Mason
Cement
Sand
Metal 50mm
Allow for water
Allow for ramming and levelling

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
3,625.00

1,300.00
750.00
2,134.65
800.00
2,573.75
50.00
75.00
7,683.40
1,075.68
8,759.08
942.82
940.00

650.00
1,000.00
749.00
2,000.00
4,085.00

1,300.00
750.00
2,134.65
800.00
2,900.35

Sub total
O.H. 14%
Total
Say per Sq.m

C016 75 mm thick floor Cement concrete 1:3:6(40).


Per 9.29 Sq.m
2.00
0.75
2.85
0.40
0.71

Day
Day
Bag
Cu.m.
Cu.m.

Labourer
Mason
Cement
Sand
Metal 40mm

@
@
@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 21 of 263

Allow for water


Allow for ramming and levelling

50.00
75.00
8,010.00
1,121.40
9,131.40
982.90
982.00

Sub total
O.H. 14%
Total
Say per Sq.m
C017 75 mm thick floor Cement concrete 1:2 1/2:5(25).
Per 9.29 Sq.m
2.00
0.75
3.50
0.42
0.71

Day
Day
Bag
Cu.m.
Cu.m.

Labourer
Mason
Cement
Sand
Metal 25mm
Allow for water
Allow for ramming and levelling

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
4,155.00

Sub total
O.H. 14%
Total
Say per Sq.m

1,300.00
750.00
2,621.50
840.00
2,950.05
50.00
75.00
8,586.55
1,202.12
9,788.67
1,053.64
1,050.00

C018
Lintol 112mm x 150mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 3.05m
2.00
2.00
6.00
0.30
0.03
0.06
1.30

hour
hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for Timber props & nails.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@

125.00
125.00
81.25
749.00
2,000.00
5,000.00
425.00

Say per L.m

250.00
250.00
487.50
224.70
60.00
300.00
552.50
150.00
2,274.70
318.46
2,593.16
850.77
850.00

C019
Lintol 225mm x 150mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 3.05m
2.00
2.00
6.00
0.60
0.06
0.10

hour
hour
hour
Bag
Cu.m.
Cu.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm

@
@
@
@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 22 of 263

125.00
125.00
81.25
749.00
749.00
5,000.00

250.00
250.00
487.50
449.40
44.94
500.00

1.58 Sq.m.

Timber planks 25mm class III. (1/4 cost)


Allow for Timber props & nails.
Sub total
O.H. 14%
Total

425.00

Say per L.m

671.50
150.00
2,803.34
392.47
3,195.81
1,048.49
1,048.00

C020
Lintol 225mm x 225mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 4.57m
4.00
3.00
11.00
1.35
0.11
0.23
3.16

hour
hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for nails & props.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@

125.00
125.00
81.25
749.00
2,000.00
5,000.00
425.00

Say per L.m

500.00
375.00
893.75
1,011.15
220.00
1,150.00
1,343.00
150.00
5,642.90
790.01
6,432.91
1,407.02
1,407.00

C021
Lintol 300mm x 225mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 4.57m
0.50
0.50
1.50
1.85
0.14
0.31
3.35

Day
Day
Day
Bag
Cu.m.
Cu.m.
Sq.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for nails & props.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@

1,000.00
1,000.00
650.00
749.00
2,000.00
5,000.00
425.00

Say per L.m

500.00
500.00
975.00
1,385.65
280.00
1,550.00
1,423.75
150.00
6,764.40
947.02
7,711.42
1,686.66
1,686.00

C022
Lintol 337mm x 150mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 4.57m
0.50 Day
0.50 Day

Mason
Carpenter

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 23 of 263

1,000.00
1,000.00

500.00
500.00

1.50
1.40
0.11
0.23
2.23

Day
Bag
Cu.m.
Cu.m.
Sq.m.

Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for nails & props.
Sub total
O.H. 14%
Total

@
@
@
@
@

650.00
749.00
2,000.00
5,000.00
425.00

Say per L.m

975.00
1,048.60
220.00
1,150.00
947.75
150.00
5,491.35
768.79
6,260.14
1,369.23
1,369.00

C023
Lintol 337mm x 225mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 4.57m
5.00
0.50
1.75
2.12
0.17
0.33
3.53

hour
Day
Day
Bag
Cu.m.
Cu.m.
Sq.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for nails & props.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@

125.00
1,000.00
650.00
749.00
2,000.00
5,000.00
425.00

Say per L.m

625.00
500.00
1,137.50
1,587.88
340.00
1,650.00
1,500.25
150.00
7,490.63
1,048.69
8,539.32
1,867.74
1,867.00

C024
Lintol 337mm x 300mm, cement concrete1:2:4(20), Including form work (Reinforcement paid separately).
Per 6.10m
1.00
0.75
2.75
3.50
0.31
0.60
3.90

Day
Day
Day
Bag
Cu.m.
Cu.m.
Sq.m.

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
Allow for nails & props.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@

1,000.00
1,000.00
650.00
749.00
2,000.00
5,000.00
425.00

Say per L.m

1,000.00
750.00
1,787.50
2,621.50
620.00
3,000.00
1,657.50
150.00
11,586.50
1,622.11
13,208.61
2,166.77
2,166.00

C025
Cement concrete 1:2 1/2:5(25) Using concrete mixture and vibrator (R/F & Shuttering paid separately).
Per 2.83 Cu.m
6.00 Day

Labourer

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 24 of 263

650.00

3,900.00

1.00
14.00
1.70
2.83
0.67
2.67

Day
Bag
Cu.m.
Cu.m.
No.
hr

Mason
cement
sand
Metal 25mm
Basket
1/3 day hire of mixer and vibrator etc.
Allow for water & curing
Sub total
O.H. 14%
Total

@
@
@
@
@

1,000.00
749.00
2,000.00
4,155.00
125.00
750.00

Say per Cu.m

1,000.00
10,486.00
3,400.00
11,758.65
83.75
2,002.50
50.00
32,680.90
4,575.33
37,256.23
13,156.93
13,150.00

C026 Cement concrete 1:1 1/2:3(20) in ground floor, using concrete mixture and vibrator (R/F & Shuttering paid
separately).
Per 2.83 Cu.m
6.00
1.00
22.60
1.78
2.83
0.67
2.67

Day
Day
Bag
Cu.m.
Cu.m.
No.
hr

Labourer
Mason
cement
sand
Metal 25mm
Basket
1/3 day hire of mixer and vibrator etc.
Allow for water & curing
Sub total
O.H. 14%
Total

@
@
@
@
@
@

Say per Cu.m

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

3,900.00
1,000.00
16,927.40
3,560.00
14,150.00
83.75
2,002.50
50.00
41,673.65
5,834.31
47,507.96
16,777.31
16,770.00

C027 Cement concrete 1:1 1/2:3(20) in first floor, using concrete mixture and vibrator (R/F & Shuttering paid
separately).
Per 2.83 Cu.m
As per Item 26
41,673.65
2.00 Day
Add Labours
@
650.00
1,300.00
Sub total
42,973.65
O.H. 14%
6,016.31
Total
48,989.96
17,300.67
Say per Cu.m
17,300.00
C028 Cement concrete 1:1 1/2:3(20) in Second floor, using concrete mixture and vibrator (R/F & Shuttering paid
separately).
Per 2.83 Cu.m
As per Item 26
41,673.65
5.00 Day
Add Labours
@
650.00
3,250.00
Sub total
44,923.65
O.H. 14%
6,289.31
Total
51,212.96
18,085.72
Say per Cu.m
18,080.00
C029 Cement concrete 1:2:4(20) in column shafts in ground floor using mixer and vibrator. (Reinforcement,
shuttering & finishes paid for separately)
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 25 of 263

Cement concrete 1:2:4(20) in column shafts in ground floor using


shuttering & finishes paid for separately)
Per 2.83 Cu.m
6.00 Day
Labourer
1.00 Day
Mason
18.00 Bag
cement
1.70 Cu.m.
sand
2.83 Cu.m.
Metal 20mm
0.67 No.
Basket
Allow for water and curing
2.67 hr.
Mixer vibrator operators fuel etc
.
Sub total
O.H. 14%
Total

mixer and vibrator. (Reinforcement,

@
@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

Say per Cu.m

3,900.00
1,000.00
13,482.00
3,400.00
14,150.00
83.75
50.00
2,002.50
38,068.25
5,329.56
43,397.81
15,325.82
15,320.00

C030 Cement concrete 1:2:4(20) in column shafts in First floor using mixer and vibrator. (Reinforcement, shuttering
& finishes paid for separately)
Per 2.83 Cu.m

2.00 Day

As per Item 29
Add Labours

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

38,068.25
1,300.00
39,368.25
5,511.56
44,879.81
15,849.18
15,840.00

C031 Cement concrete 1:2:4(20) in column shafts in Second floor using mixer and vibrator. (Reinforcement,
shuttering & finishes paid for separately)
Per 2.83 Cu.m

5.00 Day

As per Item 29
Add Labours

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

38,068.25
3,250.00
41,318.25
5,784.56
47,102.81
16,634.23
16,630.00

C032 Cement concrete 1:2:4(20) in Beams in ground floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 5.66 Cu.m
16.00
2.50
36.00
3.40
5.10
1.33
5.33

Day
Day
Bag
Cu.m.
Cu.m.
No.
hr.

Labourer
Mason
cement
sand
Metal 20mm
Basket
Mixer, vibrator, fuel and operators.
Allow for curing and water

@
@
@
@
@
@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 26 of 263

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

10,400.00
2,500.00
26,964.00
6,800.00
25,500.00
166.25
3,997.50
50.00
76,377.75
10,692.89
87,070.64

15,375.35
15,370.00

Say per Cu.m

C033 Cement concrete 1:2:4(20) in Beams in First floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 5.66 Cu.m

2.00 Day

As per Item 32
Add Labours

650.00

Sub total
O.H. 14%
Total

76,377.75
1,300.00
77,677.75
10,874.89
88,552.64
15,637.05

Say per Cu.m

15,630.00

C034 Cement concrete 1:2:4(20) in Beams in Second floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 5.66 Cu.m

5.00 Day

As per Item 32
Add Labours

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

76,377.75
3,250.00
79,627.75
11,147.89
90,775.64
16,029.60
16,020.00

C035 Cement concrete 1:2:4(20) in Lintols in ground floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 2.83 Cu.m
6.00
2.00
18.00
1.70
2.55
0.67
4.00

Day
Day
Bag
Cu.m.
Cu.m.
No.
hr.

Labourer
Mason
cement
sand
Metal 20mm
Basket
Mixer, vibrator, fuel and operators.
Allow for curing and water

@
@
@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

Sub total
O.H. 14%
Total
Say per Cu.m

3,900.00
2,000.00
13,482.00
3,400.00
12,750.00
83.75
3,000.00
50.00
38,665.75
5,413.21
44,078.96
15,566.36
15,560.00

C036 Cement concrete 1:2:4(20) in Lintols in First floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 2.83 Cu.m

2.00 Day

As per Item 35
Add Labours

@
Sub total

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 27 of 263

650.00

38,665.75
1,300.00
39,965.75

O.H. 14%
Total

5,595.21
45,560.96
16,089.73
16,080.00

Say per Cu.m

C037 Cement concrete 1:2:4(20) in Lintols in Second floor using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 2.83 Cu.m

5.00 Day

As per Item 35
Add Labours

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

38,665.75
3,250.00
41,915.75
5,868.21
47,783.96
16,874.77
16,870.00

C038 Cement concrete 1:2:4(20) in RCC first floor slab, using mixer and vibrator. (Reinforcement, shuttering &
finishes paid for separately)
Per 7.55 Cu.m
24.00
4.00
45.33
4.53
6.80
0.67
8.00

Day
Day
Bag
Cu.m.
Cu.m.
No.
hr.

Labourer
Mason
cement
sand
Metal 20mm
Basket
Mixer, vibrator, fuel and operators.
Allow for curing and water

@
@
@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

Sub total
O.H. 14%
Total
Say per Cu.m
C039 Cement concrete 1:2:4(20) in RCC Second floor slab, using mixer and vibrator. (Reinforcement,
finishes paid for separately)
Per 7.55 Cu.m
As per Item 38
5.00 Day
Add Labours
@
650.00
Sub total
O.H. 14%
Total
Say per Cu.m

15,600.00
4,000.00
33,952.17
9,060.00
34,000.00
83.75
6,000.00
100.00
102,795.92
14,391.43
117,187.35
15,533.85
15,530.00
shuttering &

102,795.92
3,250.00
106,045.92
14,846.43
120,892.35
16,024.97
16,020.00

C040 100mm thick RCC 1:2:4(20) cement conc. in first floor slab (Reinforcement, shuttering and finishes paid for
separately) using mixer & Vibrator
Per 74.32 Sq.m
24.00 day
Labourer
@
650.00
15,600.00
4.00 day
Mason
@
1,000.00
4,000.00
45.33 Bag
cement
@
749.00
33,952.17
4.53 Cu.m.
sand
@
2,000.00
9,060.00
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 28 of 263

6.80 Cu.m.
0.67 No.
8.00 hr.

Metal 20mm
Basket
Mixer, vibrator, fuel and operators.
Allow for curing and water

@
@
@

5,000.00
125.00
750.00

Sub total
O.H. 14%
Total
Say per Sq.m

34,000.00
83.75
6,000.00
100.00
102,795.92
14,391.43
117,187.35
1,576.75
1,576.00

C041 100mm thick RCC 1:2:4(20) cement conc. in second floor slab (Reinforcement, shuttering and finishes paid
for separately) using mixer & Vibrator
Per 74.32 Sq.m
As per Item 40
102,795.92
5.00 day
Add Labours
@
650.00
3,250.00
Sub total
106,045.92
O.H. 14%
14,846.43
Total
120,892.35
1,626.60
Say per Sq.m
1,626.00
C042 125mm thick RCC 1:2:4(20) cement conc. in first floor slab (Reinforcement, shuttering and finishes paid for
separately) using mixer & Vibrator
Per 74.32 Sq.m
25.00
4.00
56.67
5.67
8.50
0.67
8.00

day
day
Bag
Cu.m.
Cu.m.
No.
hr.

Unskilled Labour
Skilled Labour
cement
sand
Metal 20mm
Basket
Mixer, vibrator, fuel and operators.
Allow for curing and water

@
@
@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
5,000.00
125.00
750.00

Sub total
O.H. 14%
Total
Say per Sq.m

16,250.00
4,000.00
42,445.83
11,340.00
42,500.00
83.75
6,000.00
100.00
122,719.58
17,180.74
139,900.32
1,882.35
1,882.00

C043 125mm thick RCC 1:2:4(20) cement conc. in second floor slab (Reinforcement, shuttering and finishes paid
for separately) using mixer & Vibrator
Per 74.32 Sq.m

5.00 day

As per Item 42
Add Labours

@
Sub total
O.H. 14%
Total
Say per Sq.m

650.00

122,719.58
3,250.00
125,969.58
17,635.74
143,605.32
1,932.20
1,932.00

C044 Channels 50mm semi circular, formed in cement concrete floors and 12mm thick 1:2cement rendering (extra
over conc. floors.)
Per 3.05m

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 29 of 263

1.00 hour
2.00 hour

Labourer
Mason
Allow for cement & sand

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m

81.25
250.00
100.00
431.25
60.38
491.63
161.29
161.00

C045 Channels 100mm semi circular, formed in cement concrete floors and 12mm thick 1:2cement rendering (extra
over conc. floors.)
Per 3.05m
2.00 hour
4.00 hour

Labourer
Mason
Allow for cement & sand

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m

162.50
500.00
100.00
762.50
106.75
869.25
285.19
285.00

C046 Corbel stone 150mmx225mmx375mm in cement conc. 1:2:4(20) reinforced with 4 Nos. 10mm rods up to 0.03
Cu.m. in volume.
Per No.
0.75
0.75
0.014
0.84

hour
hour
Cu.m.
Kg.

Labourer
Mason
Materials for conc. as Item C009
Mild steel
Allow for moulds and curing.

@
@
@
@

81.25
125.00
29,667.75
100.00

Sub total
O.H. 14%
Total
Say per No.

60.94
93.75
415.35
84.00
50.00
704.04
98.57
802.60
800.00

C047 Curb in 1:2:4(20) cement concrete, 225mm high 75mm thick, 12mm thick 1:2 cement rendering. Rate to
include excavation.
Per 3.05m
1.00
1.00
0.057
0.13

Day
Day
Cu.m.
Bag

Labourer
Mason
Materials for conc. as Item C009
Cement for rendering
Allow for sand for rendering
Allow for shuttering, excavation curing etc.
Sub total
O.H. 14%
Total

@
@
@
@

650.00
1,000.00
29,667.75
749.00

Say per L.m


275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 30 of 263

650.00
1,000.00
1,691.06
97.37
100.00
125.00
3,663.43
512.88
4,176.31
1,370.18
1,370.00

C048

Semi circular drains without ramps in cement conc. 1:3:6(25) 225mm wide and 225mm average depth with
75mm thick sides and base inclusive of 12mm 1:3 cement rendering with expansion joints as necessary.
Rate to include for excavation..
Per 3.05m
1.50
1.00
1.25
0.17
0.23

Day
Day
Bag
Cu.m.
Cu.m.

Labourer
Mason
Cement
Sand
Metal 25mm
Allow for shuttering, brackets etc.

@
@
@
@
@

650.00
1,000.00
749.00
2,000.00
4,085.00

Sub total
O.H. 14%
Total
Say per L.m

C049 Pad stones, 337mm x 337mmx225mm in 1:2:4(20) cement conc. precast or in situ with formwork.
Per 7 No
8.00 hour
Labourer
@
81.25
4.00 hour
Mason
@
125.00
1.16 Bag
Cement
@
749.00
0.12 Cu.m.
Sand
@
2,000.00
0.20 Cu.m.
Metal 20mm
@
5,000.00
2.24 Sq.m.
Timber planks 25mm class III.
@
425.00
Sub total
O.H. 14%
Total
Say per No.
C050 Pad stones, 450mm x 337mmx150mm in 1:2:4(20) cement conc. precast or in situ with formwork
Per 4 No
4.00 hour
Labourer
@
81.25
2.00 hour
Mason
@
125.00
0.58 Bag
Cement
@
749.00
0.06 Cu.m.
Sand
@
2,000.00
0.10 Cu.m.
Metal 20mm
@
5,000.00
1.12 Sq.m.
Timber planks 25mm class III.
@
425.00
Sub total
O.H. 14%
Total
Say per No.
C051 Pad stones, 450mm x 225mmx150mm in 1:2:4(20) cement conc. precast or in situ with formwork
Per 6 No
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 31 of 263

975.00
1,000.00
936.25
340.00
939.55
200.00
4,390.80
614.71
5,005.51
1,642.23
1,640.00

650.00
500.00
868.84
240.00
1,000.00
952.00
4,210.84
589.52
4,800.36
685.77
685.00

325.00
250.00
434.42
120.00
500.00
476.00
2,105.42
294.76
2,400.18
600.04
600.00

4.00
2.00
0.58
0.06
0.10
1.12

hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.

Labourer
Mason
Cement
Sand
Metal 20mm
Timber planks 25mm class III.

@
@
@
@
@
@

81.25
125.00
749.00
2,000.00
5,000.00
425.00

Sub total
O.H. 14%
Total
Say per No.

325.00
250.00
434.42
120.00
500.00
476.00
2,105.42
294.76
2,400.18
400.03
400.00

C052
Spur stone 200mm x 200mm x 150mm in 1:2:4(20) cement conc. for veranda posts supplied and fixed.
Per 10 No.
2.00 hour
Labourer
@
81.25
162.50
2.00 hour
Mason
@
125.00
250.00
0.36 Bag
Cement
@
749.00
269.64
0.03 Cu.m.
Sand
@
2,000.00
60.00
0.06 Cu.m.
Metal 20mm
@
5,000.00
300.00
Allow for moulds
75.00
Sub total
1,117.14
O.H. 14%
156.40
Total
1,273.54
127.35
Say per No.
127.00
C053 Spur stones 100mm x 75mm x 50mm in 1:2:4(20) cement conc. for door posts supplied and fixed.
Per 10 No.
1.00
1.00
0.03
0.02
0.04

hour
hour
Bag
Cu.m.
Cu.m.

Labourer
Mason
Cement
Sand
Metal 20mm
Allow for moulds.

@
@
@
@
@

81.25
125.00
749.00
2,000.00
5,000.00

Sub total
O.H. 14%
Total
Say per No.

81.25
125.00
22.47
40.00
200.00
75.00
543.72
76.12
619.84
61.98
61.00

C054 Window Sill, 225mm x 75mm, cement concrete1:2:4(20), Reinforcement with 2 No. 10mm tor steel and 6mm
links at 225mm centres. including form work.
Per 6.1 m
2.00
2.00
6.00
0.60
0.06
0.10
1.55
7.40
2.65

hour
hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.
kg
kg

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
10mm tor steel with binding
6mm links

@
@
@
@
@
@
@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 32 of 263

125.00
125.00
81.25
749.00
2,000.00
5,000.00
425.00
88.20
178.18

250.00
250.00
487.50
449.40
120.00
500.00
658.75
652.68
472.17

Allow for Timber props & nails.

150.00
3,990.50
558.67
4,549.17
746.25
746.00

Sub total
O.H. 14%
Total
Say per L.m

C055 Lintol 112mm x 150mm, cement concrete1:2:4(20), Reinforcement with 2 No. 10mm tor steel including form
work.
Per 3.05m
2.00
2.00
6.00
0.30
0.03
0.06
1.30
3.70

hour
hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.
kg

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
10mm tor steel with binding
Allow for Timber props & nails.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@
@

125.00
125.00
81.25
749.00
2,000.00
5,000.00
425.00
88.20

Say per L.m

250.00
250.00
487.50
224.70
60.00
300.00
552.50
326.34
150.00
2,601.04
364.15
2,965.19
972.83
970.00

C056 Lintol 225mm x 150mm, cement concrete1:2:4(20), Reinforcement with 2 No. 12mm tor steel including form
work.
Per 3.05m
2.00
2.00
6.00
0.60
0.06
0.10
1.58
5.33

hour
hour
hour
Bag
Cu.m.
Cu.m.
Sq.m.
kg

Mason
Carpenter
Labourer
Cement
Sand
Metal 20mm
Timber planks 25mm class III. (1/4 cost)
10mm tor steel with binding
Allow for Timber props & nails.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@
@

125.00
125.00
81.25
749.00
2,000.00
5,000.00
425.00
88.20

Say per L.m

250.00
250.00
487.50
449.40
120.00
500.00
671.50
470.11
150.00
3,348.51
468.79
3,817.30
1,252.39
1,250.00

C057 100mm thick flat roof in 1:2:4(20) cement concrete and reinforced with 10mm tor steel at 125mm centres both
ways including shuttering.
Per 3.925 Sq.m
3.93 Sq.m
39.63 kg
4.92 Sq.m

100mm concrete
10mm tor steel with binding
Shuttering
Sub total

@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 33 of 263

1,383.12
88.20
1,139.08

5,435.64
3,495.37
5,604.29
14,535.30

O.H. 14%
Total
Say per Sq.m

2,034.94
16,570.24
4,221.72
4,220.00

C058 75mm thick RCC flat roof in 1:2:4(20) cement concrete and reinforced with 10mm tor steel at 125mm centres
and 6mm mild steel at 200mm centres including shuttering.
Per 4.53 Sq.m -(2.29x1.98m)
0.34
21.34
5.59
4.60

Cu.m
kg
kg
Sq.m

Concrete
10mm tor steel with binding
6mm mild steel
Shuttering
Sub total
O.H. 14%
Total

@
@
@
@

13,615.35
88.20
178.18
1,139.08

Say per Sq.m

4,629.22
1,882.19
996.00
5,239.79
12,747.20
1,784.61
14,531.80
3,207.90
3,200.00

C059 75mm thick RCC slab in 1:2:4(20) cement concrete and reinforced with 10mm tor steel at 125mm centres and
6mm mild steel at 200mm centres. - for soakage pit or drain cover slab.
Per 4.53 Sq.m -(2.29x1.98m)
0.34 Cu.m
21.34 kg
5.59 kg

Concrete
10mm tor steel with binding
6mm mild steel
Sub total
O.H. 14%
Total

@
@
@

13,615.35
88.20
178.18

Say per Sq.m

4,629.22
1,882.19
996.00
7,507.41
1,051.04
8,558.45
1,889.28
1,880.00

C060
Construction of 300x300mm size RC concrete Gate Post with 75mm thick 1:3:6(40) concrete Base,
600x600x225mm 1:2:4(20) concrete Footing, plastering and White or colour washing. Rate to include 600mm
deep excavation,10mm tor @ 150mm centres both ways in footing, 4 No. 12mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.5m all as per type plan.
Per No.
0.22
0.03
0.24
2.16
7.58
3.70
3.80
2.00
2.00

Cu.m
Cu.m
Cu.m
Sq.m
kg
kg
kg
Sq.m
Sq.m

Excavation
1:3:6(40) concrete
1:2:4(20) concrete
Form work
12mm Tor steel
10mm Tor steel
6mm steel
1:3, 16mm plastering
White or colour washing

@
@
@
@
@
@
@
@
@

1,097.50
10,505.69
13,213.98
1,460.15
164.38
164.38
178.18
391.28
43.93

Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 34 of 263

241.45
315.17
3,171.35
3,153.92
1,246.01
608.21
677.07
782.56
87.87
10,283.61
1,439.71
11,723.31
11,720.00

C061
Construction of 300x300mm size RC concrete Gate Post with 75mm thick 1:3:6(40) concrete Base,
600x600x225mm 1:2:4(20) concrete Footing, plastering and White or colour washing. Rate to include 600mm
deep excavation,10mm tor @ 150mm centres both ways in footing, 4 No. 16mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.8m all as per type plan.
Per No.
0.22
0.03
0.27
2.52
15.41
3.70
3.80
2.40
2.40

Cu.m
Cu.m
Cu.m
Sq.m
kg
kg
kg
Sq.m
Sq.m

Excavation
1:3:6(40) concrete
1:2:4(20) concrete
Form work
16mm Tor steel
10mm Tor steel
6mm steel
1:3, 16mm plastering
White or colour washing

@
@
@
@
@
@
@
@
@

1,097.50
10,505.69
13,213.98
1,460.15
164.38
164.38
178.18
391.28
43.93

Sub total
O.H. 14%
Total
Say per No.

241.45
315.17
3,567.77
3,679.57
2,533.11
608.21
677.07
939.08
105.44
12,666.87
1,773.36
14,440.23
14,440.00

C062 Construction of 225x225mm size RC concrete Gate Post with 75mm thick 1:3:6(40) concrete Base,
600x600x225mm 1:2:4(20) concrete Footing, plastering and White or colour washing. Rate to include 600mm
deep excavation,10mm tor @ 150mm centres both ways in footing, 4 No. 12mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.5m all as per type plan.
Per No.
0.22
0.03
0.17
1.62
7.58
3.70
3.80
1.54
1.54

Cu.m
Cu.m
Cu.m
Sq.m
kg
kg
kg
Sq.m
Sq.m

Excavation
1:3:6(40) concrete
1:2:4(20) concrete
Form work
12mm Tor steel
10mm Tor steel
6mm steel
1:3, 16mm plastering
White or colour washing

@
@
@
@
@
@
@
@
@

1,097.50
10,505.69
13,213.98
1,460.15
164.38
164.38
178.18
391.28
43.93

Sub total
O.H. 14%
Total
Say per No.

241.45
315.17
2,246.38
2,365.44
1,246.01
608.21
677.07
602.57
67.66
8,369.95
1,171.79
9,541.74
9,540.00

C063
Shuttering for Footing and dismantling to surface area, including class II timber joists and necessary props.
275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 35 of 263

Shuttering for Footing and dismantling to surface area, including class II timber joists and necessary props.
Per 1.30 Sq.m (1.07x1.07x.3m box)
0.50
0.50
1.49
4.57

hour
hour
Sq.m.
L.m

Carpenter
Labourer
Timber planks 25mm cl.III
Timber 50x50 battens-1/4 cost
Allow for props, mould oil and nails.
Sub total
O.H. 14%
Total

@
@
@
@

125.00
81.25
425.00
29.50

Say per Sq.m

62.50
40.63
633.25
134.82
150.00
1,021.19
142.97
1,164.16
895.51
895.00

C064 Shuttering for column shafts in ground floor including class II timber joists and necessary props. Rate to
include for removal. (for column 225mmx225mmx1200mm high.)
Per 1.115Sq.m
3.00
3.00
1.53
4.57
6.00
1.70

hour
hour
Sq.m.
L.m
No.
No.

0.25 Lit

Carpenter
Labourer
Timber planks 25mm cl.III
Timber 50x50 battens-1/4 cost
Bolt & nut 10dia 450mm (1/15 use)
Props (Bamboo 3-4m) -1/3 cost
Allow for screws and nails.
Mould oil

@
@
@
@
@
@

125.00
81.25
425.00
29.50
5.83
52.50

100.00

Sub total
O.H. 14%
Total
Say per Sq.m

375.00
243.75
650.25
134.82
35.00
89.25
75.00
25.00
1,628.07
227.93
1,855.99
1,664.57
1,664.00

C065 Shuttering for column shafts in First floor including class II timber joists and necessary props. Rate to include
for removal. (for column 225mmx225mmx1200mm high.)
Per 1.115Sq.m

0.75 hour

As per Item 64
Add Labours

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

1,628.07
60.94
1,689.00
236.46
1,925.46
1,674.32
1,674.00

C066 Shuttering for column shafts in second floor including class II timber joists and necessary props. Rate to
include for removal. (for column 225mmx225mmx1200mm high.)
Per 1.115Sq.m

1.25 hour

As per Item 64
Add Labours

@
Sub total

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 36 of 263

81.25

1,628.07
101.56
1,729.63

O.H. 14%
Total

242.15
1,971.78
1,714.59
1,714.00

Say per Sq.m

C067 Shuttering for beam and lintols in ground floor including class II timber joists and necessary props. Rate to
include for removal. (300mmx450mm beam-6.1m long.)
Per 7.432 Sq.m
1.00
1.00
7.99
60.96
3.18
14.00
0.56

Day
Day
Sq.m.
L.m
kg
No.
Lit

Carpenter
Labourer
Ginisapu planks 25mm -1/4 cost
Timber 50x50 battens-1/4 cost
Wire nails
Props 3-4m round jungle -1/4 cost
Mould oil

@
@
@
@
@
@
@

1,000.00
650.00
332.50
29.50
185.00
78.75
100.00

Sub total
O.H. 14%
Total
Say per Sq.m

1,000.00
650.00
2,656.68
1,798.32
588.30
1,102.50
56.00
7,851.80
1,099.25
8,951.05
1,204.39
1,204.00

C068 Shuttering for beam and lintols in first floor including class II timber joists and necessary props. Rate to
include for removal. (300mmx450mm beam-6.1m long.)
Per 7.432 Sq.m

2.00 hour

As per Item 67
Add Labours

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

7,851.80
162.50
8,014.30
1,122.00
9,136.30
1,229.32
1,229.00

C069 Shuttering for beam and lintols in second floor including class II timber joists and necessary props. Rate to
include for removal. (300mmx450mm beam-6.1m long.)
Per 7.432 Sq.m

4.00 hour

As per Item 67
Add Labours

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

7,851.80
325.00
8,176.80
1,144.75
9,321.55
1,254.24
1,254.00

C070 Shuttering for first floor slab conc. Including 100x50mm class II joists and necessary props. Rate to include
for removal.
Per 9.29 Sq.m
1.00 day

Carpenter

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 37 of 263

1,000.00

1,000.00

3.00
10.68
15.24
30.00
0.91
1.13

day
Sq.m.
L.m
No.
Kg.
Lit

Labourer
Timber planks 25mm cl.III
100x50 cl.II timber joist-1/4 cost
Props 3-4m round jungle -1/4 cost
Wire nails BWG 4 - 8
Mould oil

@
@
@
@
@
@

650.00
425.00
29.50
78.75
185.00
100.00

Sub total
O.H. 14%
Total
Say per Sq.m

1,950.00
4,539.00
449.58
2,362.50
168.35
113.00
10,582.43
1,481.54
12,063.97
1,298.60
1,298.00

C071 Shuttering for second floor slab conc. Including 100x50mm class II joists and necessary props. Rate to
include for removal.
Per 9.29 Sq.m

6.00 hour

As per Item 70
Add Labours

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

10,582.43
487.50
11,069.93
1,549.79
12,619.72
1,358.42
1,358.00

C072 Shuttering for third floor slab conc. Including 100x50mm class II joists and necessary props. Rate to include
for removal.
Per 9.29 Sq.m

12.00 hour

As per Item 70
Add Labours

@
Sub total
O.H. 14%
Total
Say per Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - C - Page No: 38 of 263

81.25

10,582.43
975.00
11,557.43
1,618.04
13,175.47
1,418.24
1,418.00

D - BRICK LAYER
D001 Arch, Segmental, brick work in 1:3 cement mortar including centering.
Per 2.83 cu.m
6.00
8.00
1450.00
6.30
0.65

Day
Day
No.
Bag
Cu.m.

Mason
Labourer
Bricks
Cement
Sand
Allow for scaffolding.

@
@
@
@
@

1,000.00
650.00
7.20
749.00
2,000.00

Sub total
O.H. 14%
Total
Say per Cu.m

6,000.00
5,200.00
10,440.00
4,718.70
1,300.00
150.00
27,808.70
3,893.22
31,701.92
11,195.45
11,190.00

D002 Brick work in 1:5 cement mortar up to 1st floor level - above 3 Cu.m.
Per 2.83 cu.m
1450.00
0.65
3.70
3.00
5.00

No
Cu.m.
Bag
Day
Day

Bricks
Sand
Cement
Mason
Labourer
Allow for scaffolding.

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Cu.m

10,440.00
1,300.00
2,771.30
3,000.00
3,250.00
150.00
20,911.30
2,927.58
23,838.88
8,418.64
8,410.00

D003 Brick work in 1:5 cement mortar from 1st floor level to second floor level. - above 3 Cu.m.
Per 2.83 cu.m

1.50 Day

As per item No.2


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

20,911.30
975.00
75.00
21,961.30
3,074.58
25,035.88
8,841.35
8,840.00

D004 Brick work in 1:5 cement mortar from second floor level to third floor. - above 3 Cu.m.
Per 2.83 cu.m

3.50 Day

As per item No.2


Labourer for lift
Add for scaffolding.

@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 39 of 263

650.00

20,911.30
2,275.00
75.00
23,261.30
3,256.58
26,517.88
9,364.72

Say per Cu.m

9,360.00

D005 Brick work in 1:5 cement mortar up to 1st floor level - up to 3 Cu.m.
Per 2.83 cu.m

0.75 Day
0.75 Day

As per item No.2


Add 25% of Mason
Add 25% of Labourer

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Cu.m

20,911.30
750.00
487.50
22,148.80
3,100.83
25,249.63
8,916.84
8,910.00

D006 Brick work in 1:5 cement mortar from 1st floor level to second floor level. - up to 3 Cu.m.
Per 2.83 cu.m

1.50 Day

As per item No.5


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

22,148.80
975.00
100.00
23,223.80
3,251.33
26,475.13
9,349.62
9,340.00

D007 Brick work in 1:5 cement mortar from second floor level to third floor. - up to 3 Cu.m.
Per 2.83 cu.m

3.50 Day

As per item No.5


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

22,148.80
2,275.00
100.00
24,523.80
3,433.33
27,957.13
9,872.98
9,870.00

D008 Brick work in 1:5 cement mortar in piers up to 1st floor level
Per 2.83 cu.m

1.50 Day
1.50 Day

As per item No.2


Add 50% of Mason
Add 50% of Labourer

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Cu.m

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 40 of 263

20,911.30
1,500.00
975.00
23,386.30
3,274.08
26,660.38
9,415.04
9,410.00

D009 Brick work in 1:5 cement mortar in piers from 1st floor level to second floor level.
Per 2.83 cu.m

1.50 Day

As per item No.8


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

23,386.30
975.00
100.00
24,461.30
3,424.58
27,885.88
9,847.82
9,840.00

D010 Brick work in 1:5 cement mortar in piers from second floor level to third floor.
Per 2.83 cu.m

3.50 Day

As per item No.8


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Cu.m

23,386.30
2,275.00
100.00
25,761.30
3,606.58
29,367.88
10,371.19
10,370.00

D011 Brick work in 1:3 cement mortar with bricks available at site including shorting and cleaning bricks.
Per 2.83 cu.m
2.00
3.00
5.00
0.65
3.70

Day
Day
Day
Cu.m.
50 Kg.

Labourer for sorting and cleaning bricks


Mason
Labourer
Sand
Cement
Allow for water & scaffolding
Sub total
O.H. 14%
Total

@
@
@
@
@

650.00
1,000.00
650.00
2,000.00
749.00

Say per Cu.m

1,300.00
3,000.00
3,250.00
1,300.00
2,771.30
150.00
11,771.30
1,647.98
13,419.28
4,738.98
4,730.00

D012 Brick work 112mm thick in 1:3 cement mortar up to 1st floor level - above 10 sq.m
Per 9.29 Sq.m
550.00
0.26
1.30
1.50
2.00

No.
Cu.m.
50 Kg.
Day
Day

Bricks
Sand
Cement
Mason
Labour
Allow for water & scaffolding

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 41 of 263

3,960.00
520.00
973.70
1,500.00
1,300.00
150.00

Sub total
O.H. 14%
Total

8,403.70
1,176.52
9,580.22
1,031.21
1,030.00

Say per Sq.m


D013 Brick work 112mm thick in 1:3 cement mortar from 1st floor level to 2 nd floor level - above 10 sq.m
Per 9.29 Sq.m

0.50 Day

As per item No.12


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Sq.m

8,403.70
325.00
50.00
8,778.70
1,229.02
10,007.72
1,077.22
1,070.00

D014 Brick work 112mm thick in 1:3 cement mortar from 2 nd floor level t 3 rd floor level - above 10 sq.m
Per 9.29 Sq.m

1.50 Day

As per item No.12


Labourer for lift
Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Sq.m
D015 Brick work 112mm thick in 1:3 cement mortar up to 1st floor level - up to 10 sq.m
Per 9.29 Sq.m
As in Item No. 12
3.00 hour
Add 25% of Mason
@
4.00 hour
Add 25% of Labourer
@
Sub total
O.H. 14%
Total

125.00
81.25

Say per Sq.m

8,403.70
975.00
50.00
9,428.70
1,320.02
10,748.72
1,156.98
1,150.00

8,403.70
375.00
325.00
9,103.70
1,274.52
10,378.22
1,117.10
1,110.00

D016 Brick work 112mm thick in 1:3 cement mortar from 1st floor level to 2 nd floor level - up to 10 sq.m
Per 9.29 Sq.m
As per item No.15
9,103.70
0.50 Day
Labourer for lift
@
650.00
325.00
Add for scaffolding.
50.00
Sub total
9,478.70
O.H. 14%
1,327.02
Total
10,805.72
1,163.12
Say per Sq.m
1,160.00
D017 Brick work 112mm thick in 1:3 cement mortar from 2 nd floor level t 3 rd floor level - up to 10 sq.m
Per 9.29 Sq.m
As per item No.15
9,103.70
275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 42 of 263

1.50 Day

Labourer for lift


Add for scaffolding.

650.00

Sub total
O.H. 14%
Total
Say per Sq.m

975.00
50.00
10,128.70
1,418.02
11,546.72
1,242.88
1,240.00

D018 Brick work 112mm thick in 1:5 cement mortar with available bricks, including sorting and cleaning.
Per 9.29 Sq.m
0.75 Day

Labourer for cleaning and sorting bricks


As per item No.12
Less Bricks
Sub total
O.H. 14%
Total

650.00

Say per Sq.m

487.50
8,403.70
3,960.00
4,931.20
690.37
5,621.57
605.10
600.00

D019 Coping, brick in cement 1:5, weathered and throated on 112mm thick to walls, complete with 12mm thick 1:3
cement rendering.
Per 30.48 L.m.
400.00
0.65
5.10
6.00
6.00

No.
Cu.m.
50Kg.
day
day

Bricks
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

2,880.00
1,300.00
3,819.90
6,000.00
3,900.00
17,899.90
2,505.99
20,405.89
669.48
660.00

D020 Coping, brick in cement 1:5, weathered and throated on 225mm thick to walls, complete with 12mm thick
1:3 cement rendering.
Per 3.05 L.m.
67.00
0.09
0.72
0.75
0.75

No.
Cu.m.
50Kg.
Day
Day

Bricks
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

482.40
180.00
539.28
750.00
487.50
2,439.18
341.49
2,780.67
912.29
910.00

D021 Coping, brick in cement 1:5, weathered and throated on 350mm thick to walls, complete with 12mm thick
1:3 cement rendering.
Per 3.05 L.m.
94.00 No.

Bricks

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 43 of 263

7.20

676.80

0.18
1.22
1.00
1.00

Cu.m.
50Kg.
Day
Day

Sand
Cement
Mason
Labourer

@
@
@
@

2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

360.00
913.78
1,000.00
650.00
3,600.58
504.08
4,104.66
1,345.79
1,340.00

D022 Coping, brick in cement 1:5, weathered and throated on 112mm thick to walls, and 12mm thick 1:3 cement
rendering with available bricks.
Per 30.48 L.m.
As in Item No. 19
Less Bricks

17,899.90
2,880.00
15,019.90
2,102.79
17,122.69
561.77
561.00

Sub total
O.H. 14%
Total
Say per L.m

D023 Coping, brick in cement 1:5, weathered and throated on 225mm thick to walls, and 12mm thick 1:3 cement
rendering with available bricks.
Per 3.05 L.m.
As in Item No. 20
Less Bricks

2,439.18
482.40
1,956.78
273.95
2,230.73
731.87
731.00

Sub total
O.H. 14%
Total
Say per L.m

D024 Coping, brick in cement 1:5, weathered and throated on 350mm thick to walls, and 12mm thick 1:3 cement
rendering with available bricks.
Per 3.05 L.m.
As in Item No. 21
Less Bricks

3,600.58
676.80
2,923.78
409.33
3,333.11
1,093.54
1,090.00

Sub total
O.H. 14%
Total
Say per L.m

D025 Cornices, brick in cement 1:5, and 12mm thick 1:3 cement rendering, up to 225mm thick projection and
225mm depth.
Per 3.05 L.m.
60.00 No.

Bricks

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 44 of 263

7.20

432.00

0.03
0.27
2.00
2.00

Cu.m.
50Kg.
Day
Day

Sand
Cement
Mason
Labourer

@
@
@
@

2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

60.00
202.23
2,000.00
1,300.00
3,994.23
559.19
4,553.42
1,493.90
1,490.00

D026 Inserting of door or window in existing walls including making opening and making good to floors and walls
(lintol or arch & door or and window paid separately).
Per No.
1.00 Day
190.00
0.08
0.52
1.00
1.00

No.
Cu.m.
50Kg.
Day
Day

0.75
0.14
0.50
1.00

50Kg.
Cu.m.
Day
Day

Labourer for making openings in walls


Building masonry
Bricks
Sand
Cement
Mason
Labourer
Plastering/ rendering
Cement
Sand
Mason
Labourer
Sub total
O.H. 14%
Total

650.00

650.00

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

1,368.00
160.00
389.48
1,000.00
650.00

@
@
@
@

749.00
2,000.00
1,000.00
650.00

561.75
280.00
500.00
650.00
6,209.23
869.29
7,078.52
7,070.00

Say per No.

D027

Drains, brick in cement 1:5, 225mm to 300mm average depth, 300mm wide, and cement rendered 12mm
thick 1:2 complete with expansion joints as necessary, including necessary excavation. (apron paid for
separately)
Per 3.05 L.m.
1.25
1.50
200.00
0.17
1.00

Day
Day
No.
Cu.m.
50Kg.

Mason
Labourer
Bricks
Sand
Cement

@
@
@
@
@

1,000.00
650.00
7.20
2,000.00
749.00

Sub total
O.H. 14%
Total
Say per L.m

D028

1,250.00
975.00
1,440.00
340.00
749.00
4,754.00
665.56
5,419.56
1,778.07
1,770.00

Drains, brick in cement 1:5, 150mm to 225mm average depth, 225mm wide, and cement rendered 12mm
thick 1:2 complete with expansion joints as necessary, including necessary excavation. (apron paid for
separately)
275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 45 of 263

Drains, brick in cement 1:5, 150mm to 225mm average depth, 225mm wide, and cement rendered 12mm
thick 1:2 complete with expansion joints as necessary, including necessary excavation. (apron paid for
separately)
Per 3.05 L.m.
1.00
1.25
100.00
0.11
0.68

Day
Day
No.
Cu.m.
50Kg.

Mason
Labourer
Bricks
Sand
Cement

@
@
@
@
@

1,000.00
650.00
7.20
2,000.00
749.00

Sub total
O.H. 14%
Total
Say per L.m
D029

Drains, brick in cement 1:5, 225mm to 300mm average depth, 300mm wide, and cement rendered 12mm
thick 1:2 complete with expansion joints as necessary, including necessary excavation and 750mm wide
apron formed of brick masonry
Per 3.05 L.m.
290.00
0.28
2.13
1.75
2.50

1000 Nos.
Cu.m.
50Kg.
Day
Day

Bricks
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

D030

1,000.00
812.50
720.00
220.00
509.32
3,261.82
456.65
3,718.47
1,219.97
1,210.00

2,088.00
560.00
1,595.37
1,750.00
1,625.00
7,618.37
1,066.57
8,684.94
2,849.39
2,840.00

Drains, brick in cement 1:5, 150mm to 225mm average depth, 225mm wide, and cement rendered 12mm
thick 1:2 complete with expansion joints as necessary, including necessary excavation and 750mm wide
apron formed of brick masonry
Per 3.05 L.m.
190.00
0.23
1.81
1.50
2.25

1000 Nos.
Cu.m.
50Kg.
Day
Day

Bricks
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

1,368.00
460.00
1,355.69
1,500.00
1,462.50
6,146.19
860.47
7,006.66
2,298.77
2,290.00

D031 Steps, 300mm wide and 150mm to 225mm high masonry or brick work in cement mortar 1:3, rendered
12mm thick 1:2 cement and sand with foundation 150mm below ground.
Per 3.05 L.m.

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 46 of 263

120.00
0.11
0.60
0.50
0.50

No.
Cu.m.
50Kg.
Day
Day

Bricks
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m

864.00
220.00
449.40
500.00
325.00
2,358.40
330.18
2,688.58
882.08
880.00

D032 Vent openings up to 300mm height and 150mm width, formed on existing walls, and walls made good.
Per 8 No. (300 x 100mm)
0.25
0.04
1.00
1.00

50kg
Cu.m.
Day
Day

Cement
Sand
Mason
Labourer

@
@
@
@

749.00
2,000.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per No.
D033

187.25
80.00
1,000.00
650.00
1,917.25
268.42
2,185.67
273.21
270.00

Construction of Boundary wall with 100mm thick 1:3:6(40) concrete base, RR masonry foundation, DPC,
225x225mm brick column at 2.4m centres, 112mm brick work, brick copping, 16mm plaster, expansion
joints and white or colour washing. All as per drawing
Per 30.48 L.m
Excavation
1:3:6(40) concrete
R.R. masonry
20mm DPC
Brick pillar
112mm brick work
16mm plaster
225mm wall copping
112mm wall copping
White or colour washing

8.50
1.90
6.29
9.57
1.05
41.90
125.79
2.97
27.51
139.73
Sub total
O.H. 14%
Total

Cu.m
Cu.m
Cu.m
Sq.m
Cu.m
Sq.m
Sq.m
L.m
L.m
Sq.m

@
@
@
@
@
@
@
@
@
@

387.58
10,418.04
7,460.08
677.87
8,258.81
904.57
391.48
800.26
587.27
54.03

Say per L.m

275544406.xls - DEPARTMENT OF BUILDINGS - D - Page No: 47 of 263

3,294.42
19,794.27
46,923.88
6,487.22
8,671.75
37,901.36
49,243.98
2,376.76
16,155.72
7,549.36
198,398.73
27,775.82
226,174.55
7,420.42
7,420.00

E - MASONARY
E001 Random rubble masonary in 1:5 cement mortar, above 3 Cu.m.
Per 2.83 Cu.m
2.83
1.27
7.25
3.00
6.00

Cu.m.
Cu.m.
50 Kg.
Day
Day

Rubble 150mm to 225mm.


Sand
Cement
Mason
Labourer

@
@
@
@
@

2,210.00
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Cu.m

6,254.30
2,540.00
5,430.25
3,000.00
3,900.00
21,124.55
2,957.44
24,081.99
8,504.49
8,500.00

E002 Random rubble masonary in 1:5 cement mortar, upto 3 Cu.m.


Per 2.83 Cu.m

1.50 Day

As in item No.1
Add 25% on Labourer

21,124.55
@
650.00
975.00
Sub total
22,099.55
O.H. 14%
3,093.94
Total
25,193.49
8,897.01
Say per Cu.m
8,890.00

E003 Random rubble masonary in 1:5 cement mortar with available rubble, including sorting out and
cleaning rubble.
Per 2.83 Cu.m
1.27
7.25
3.00
8.00

Cu.m.
50 Kg.
Day
Day

Sand
Cement
Mason
Labourer

@
@
@
@

2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Cu.m

275544406.xls - DEPARTMENT OF BUILDINGS - E - Page No: 48 of 263

2,540.00
5,430.25
3,000.00
5,200.00
16,170.25
2,263.84
18,434.09
6,509.95
6,500.00

F - PAVIOR
F001 Expansion joints in brick floors filled with bitumen and sand.
Per 6.10 L.m.
1.00 hour
1.00 hour

Mason
Labourer
Allow for sand and bitumen

@
@

81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m

81.25
125.00
75.00
281.25
39.38
320.63
52.60
52.50

F002 Expansion joints in Conc. Floors filled with bitumen and sand (to full depth of conc. & rendering) - 6mm
thick and 100mm deep.
Per 6.10 L.m.
2.00
2.00
0.007
1.13

hour
Hour
Cu.m.
Lit

Mason
Labourer
Sand
Bitumen

@
@
@
@

81.25
125.00
2,000.00
47.25

Sub total
O.H. 14%
Total
Say per L.m

162.50
250.00
14.00
53.39
479.89
67.18
547.08
89.74
89.00

F003 Floors, brick paved, 75mm thick set in 2:5 lime mortar.
Per 9.29 Sq.m
350.00
0.28
3.00
1.25
2.50

No.
Cu.m.
Bus.
day
day

Brick
Sand
Slaked lime
Mason
Labourer

@
@
@
day
day

7.20
2,000.00
395.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

2,520.00
560.00
1,185.00
1,250.00
1,625.00
7,140.00
999.60
8,139.60
876.14
870.00

F004 Floors, brick paved, 75mm thick set in 2:5 lime mortar with available bricks, including sorting out and
cleaning bricks.
Per 9.29 Sq.m
0.5
0.28
3.00
1.25
2.50

day
Cu.m.
Bus.
day
day

Labourer, sorting and cleaning bricks


Sand
Slaked lime
Mason
Labourer
Sub total
O.H. 14%
Total

@
@
@
@
@

650.00
2,000.00
395.00
1,000.00
650.00

275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 49 of 263

325.00
560.00
1,185.00
1,250.00
1,625.00
4,945.00
692.30
5,637.30
606.79

Say per Sq.m

600.00

F005 Floors, brick paved, 75mm thick set in lime mortar 2:5, and cement rendered 12mm, 1:2.
Per 9.29 Sq.m
350.00
0.42
3.00
1.50
2.00
4.00

No.
Cu.m.
Bus.
50 Kg.
Day
Day

Brick
Sand
Slaked lime
Cement
Mason
Labourer

@
@
@
@
@
@

7.20
2,000.00
395.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

2,520.00
840.00
1,185.00
1,123.50
2,000.00
2,600.00
10,268.50
1,437.59
11,706.09
1,260.03
1,260.00

F006 Floors, brick paved, 75mm thick set in lime mortar 2:5, and cement rendered 12mm, 1:2 with available
bricks, including sorting out and cleaning bricks.
Per 9.29 Sq.m
0.5
0.42
3.00
1.50
2.00
4.00

day
Cu.m.
Bus.
50 Kg.
day
day

Labourer, sorting and cleaning bricks


Sand
Slaked lime
Cement
Mason
Labourer
Sub total
O.H. 14%
Total

@
@
@
@
@
@

650.00
2,000.00
395.00
749.00
1,000.00
650.00

Say per Sq.m

325.00
840.00
1,185.00
1,123.50
2,000.00
2,600.00
8,073.50
1,130.29
9,203.79
990.69
990.00

F007 Floors, brick paved, 75mm thick, set in cement mortar 1:5.
Per 9.29 Sq.m
350.00
0.28
1.50
1.25
2.50

No.
Cu.m.
bag
day
day

Brick
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

2,520.00
560.00
1,123.50
1,250.00
1,625.00
7,078.50
990.99
8,069.49
868.59
860.00

F008 Floors, brick paved, 75mm thick, set in cement mortar 1:5, with available bricks, including sorting out and
cleaning bricks.
Per 9.29 Sq.m
0.28 Cu.m.
Sand
@
2,000.00
560.00
1.50 bag
Cement
@
749.00
1,123.50
1.25 day
Mason
@
1,000.00
1,250.00
3.00 day
Labourer
@
650.00
1,950.00
Sub total
4,883.50

275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 50 of 263

O.H. 14%
Total
Say per Sq.m
F009 Floors, brick paved, 75mm thick, set in cement mortar 1:5, and cement rendered 12mm, 1:2.
Per 9.29 Sq.m
350.00
0.42
3.00
2.00
4.00

No.
Cu.m.
50 Kg.
Day
Day

Brick
Sand
Cement
Mason
Labourer

@
@
@
@
@

7.20
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

683.69
5,567.19
599.25
590.00

2,520.00
840.00
2,247.00
2,000.00
2,600.00
10,207.00
1,428.98
11,635.98
1,252.49
1,250.00

F010 Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cement rendered with expansion
joints filled with cement and sand.
Per 9.29 Sq.m
0.71
0.51
5.00
1.25
3.50

Cu.m.
Cu.m.
50 Kg.
Day
Day

Metal 25mm
Sand
Cement
Mason
Labourer

@
@
@
@
@

4,155.00
2,000.00
749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

F011

2,950.05
1,020.00
3,745.00
1,250.00
2,275.00
11,240.05
1,573.61
12,813.66
1,379.25
1,370.00

Floors, upper, 100mm thick 1:2 :4 (20) cement concrete with 12mm thick 1:3 cement rendering and soffit
plastering with lime putty and expansion joints filled with cement and sand. Rate to include for shuttering.
(reinforcement paid for separately).
Per 9.29 Sq.m
0.76
0.93
6.90
0.75
10.68
0.14
24.38
0.91
1.13
2.50
1.00
10.00

Cu.m.
Cu.m.
50 kg.
Bus.
Sq.m.
Cu.m.
m
Kg.
Lit
day
day
day

Sand
Metal 20mm
Cement
Boiled lime
Timber plank 25mm Class III
Timber beams III
Props round timber
Wire nail S.W.G 20 to 22
Mould oil
Mason
Carpenter
Labourer

@
@
@
@
@
@
@
@
@
@
@
@

2,000.00
5,000.00
749.00
445.00
425.00
6,212.50
13.13
185.00
100.00
1,000.00
1,000.00
650.00

Sub total
275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 51 of 263

1,520.00
4,650.00
5,168.10
333.75
4,539.00
869.75
319.99
168.35
113.00
2,500.00
1,000.00
6,500.00
27,681.94

O.H. 14%
Total
Say per Sq.m

3,875.47
31,557.41
3,396.81
3,390.00

F012 Floors, gravel, 100mm thick, Spread, Watered and rammed.


Per 9.29 Sq.m
0.94 Cu.m.
2.00 hour
2.00 hour

Gravel
Transport 3 mils
Labour -Transporting spreading and levelling
Labour -watering and ramming
Sub total
O.H. 14%
Total

800.00
181.07
81.25
81.25

Say per Sq.m

752.00
181.07
162.50
162.50
1,258.07
176.13
1,434.20
154.38
154.00

F013 Terrazzo tile flooring Supplied and laid. Rate to include for 12mm thick 1:3 cement mortar levelling screed
etc.
Per 9.29 Sq.m
104.00
1.25
0.20
3.00
2.00
1.00

No.
50 Kg.
Cu.m.
Day
Day
Day

Tile Terrazzo 300x300mm


Cement
Sand
Labourer
Mason
Special Mason
Allow for coloured cement, steel pins etc.
Allow for polishing
Sub total
O.H. 14%
Total

@
@
@
@
@
@

150.00
749.00
2,000.00
650.00
1,000.00
1,000.00

Say per Sq.m

15,600.00
936.25
400.00
1,950.00
2,000.00
1,000.00
150.00
200.00
22,236.25
3,113.08
25,349.33
2,728.58
2,720.00

F014 Glazed tile flooring Supplied and laid. Rate to include for 12mm thick 1:3 cement mortar levelling screed
etc.
Per 9.29 Sq.m
104.00 No.
2.00
0.20
3.00
2.00
1.00

50 Kg.
Cu.m.
day
day
Day

300mmx300mm ceramic floor tile.


Add 10% for specials and wastage
Cement
Sand
Labourer
Mason
Special Mason
Allow for coloured cement, steel pins etc.
Sub total

150.00

@
@
@
@
@

749.00
2,000.00
650.00
1,000.00
1,000.00

275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 52 of 263

15,600.00
1,560.00
1,498.00
400.00
1,950.00
2,000.00
1,000.00
150.00
24,158.00

O.H. 14%
Total
Say per Sq.m

3,382.12
27,540.12
2,964.40
2,960.00

F015 Glazed tile flooring 200x200 mm coloured supplied an laid of approved pattern and colour to floors
including 20mm thick 1:3 cement sand bedding.
Per 9.29 Sq.m
233.00
1.25
0.20
3.00
2.00
1.00

No.
50 Kg.
Cu.m.
day
day
Day

Tile cement pressed 200x200mm


Cement
Sand
Labourer
Mason
Special Mason
Allow for coloured cement, steel pins etc.
Allow for polishing
Sub total
O.H. 14%
Total

@
@
@
@
@
@

127.00
749.00
2,000.00
650.00
1,000.00
1,000.00

Say per Sq.m

29,591.00
936.25
400.00
1,950.00
2,000.00
1,000.00
150.00
200.00
36,227.25
5,071.82
41,299.07
4,445.54
4,440.00

F016 Tiles glazed - white150x150mm, with all specials, supplied and fixed to walls including raking plaster and
bedding in cement mortar 1:2.
Per 9.29 Sq.m
400.00 No.
1.25
0.20
3.00
2.00
1.00

50 Kg.
Cu.m.
day
day
Day

Tile glazed 150x150mm


@
Add 25% for specials and wastage in cutting etc.
Cement
@
Sand
@
Labourer
@
Mason
@
Special Mason
@
Allow for coloured cement, steel pins etc.
Sub total
O.H. 14%
Total

220.00
749.00
2,000.00
650.00
1,000.00
1,000.00

Say per Sq.m

88,000.00
22,000.00
936.25
400.00
1,950.00
2,000.00
1,000.00
150.00
116,436.25
16,301.08
132,737.33
14,287.73
14,280.00

F017 Tiles glazed, with all specials, fixed to walls including raking plaster and bedding in cement mortar 1:2.
(Tiles supplied by client.)
Per 9.29 Sq.m
1.25
0.20
3.00
2.00

50 Kg.
Cu.m.
day
day

Cement
Sand
Labourer
Mason

@
@
@
@

749.00
2,000.00
650.00
1,000.00

275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 53 of 263

936.25
400.00
1,950.00
2,000.00

1.00 Day

Special Mason
Allow for coloured cement, steel pins etc.
Sub total
O.H. 14%
Total

1,000.00

Say per Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - F - Page No: 54 of 263

1,000.00
150.00
6,436.25
901.08
7,337.33
789.78
780.00

G - ROOFER
G001 Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75 purlin, 100x75 wall plates,
100x50 rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - single storyed buildings.
Per 55.742 Sq.m
0.09 Cu.m.
Ridge plate and hip plates 150 x 50 mm
@
66,950.00
6,025.50
0.106 Cu.m.
Wall plate 100 x 75 mm
@
69,704.00
7,388.62
0.168 Cu.m.
Purlin 150 x 75 mm
@
68,446.00
11,498.93
0.60 Cu.m.
Rafter 100 x 50mm
@
68,572.00
41,143.20
201.17 m
50mmx25mm reeper
@
37.00
7,443.29
750.00 No.
Tile calicut pattern Gr.I.
@
35.00
26,250.00
52.00 No.
Ridge tile calicut pattern Gr.I.
@
45.00
2,340.00
3.63 Kg.
Wire nail S.W.G. 04 to 18
@
185.00
671.55
0.91 Kg.
Wire nail S.W.G. 20 to 22
@
185.00
168.35
11.36 Lit.
Wood preservative
@
1,000.00
11,360.00
1.50 50 Kg.
Cement
@
749.00
1,123.50
1.50 Bushels
Slaked lime
@
395.00
592.50
0.23 Cu.m.
Sand
@
2,000.00
460.00
10.00 day
Carpenter for timber work
@
1,000.00
10,000.00
4.00 day
Labourer for timber work
@
650.00
2,600.00
3.00 day
Labourer for treating timber
@
650.00
1,950.00
3.00 day
Labourer for laying tiles
@
650.00
1,950.00
1.50 day
Mason for ridging
@
1,000.00
1,500.00
1.50 day
Labourer for ridging
@
650.00
975.00
Allow for colouring powder etc.
150.00
Sub total
135,590.44
O.H. 14%
18,982.66
Total
154,573.10
2,773.01
Say per Sq.m.
2,770.00
G002 Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75 purlin, 100x75 wall plates,
100x50 rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - Two storyed buildings.
Per 55.742 Sq.m

3.00 day

As per item No. 1


Unskilled Labour
Allow for scaffolding

650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

135,590.44
1,950.00
250.00
137,790.44
19,290.66
157,081.10
2,818.00
2,810.00

G003 Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75 purlin, 100x75 wall plates,
100x50 rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - Three storyed buildings.
Per 55.742 Sq.m
As per item No. 2
137,790.44
3.00 day
Unskilled Labour
@
650.00
1,950.00
Allow for scaffolding
250.00
Sub total
139,990.44
O.H. 14%
19,598.66
Total
159,589.10

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 55 of 263

Say per Sq.m.

2,863.00
2,860.00

G004 Roof, Gable with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 100x75 wall plates, 100x50
rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including ridging
and application of two coats wood preservative etc. - single storyed buildings.
Per 55.742 Sq.m
0.052
0.104
0.156
0.582
207.26
750.00
19.00
3.63
0.91
11.36
1.50
1.50
0.23
10.00
4.00
3.00
3.00
1.50
1.50

Cu.m.
Cu.m.
Cu.m.
Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
50 Kg.
Bushels
Cu.m.
day
day
day
day
day
day

Ridge plate 150 x 50 mm


Wall plate 100 x 75 mm
Purlin 150 x 75 mm
Rafter 100 x 50mm
50mmx25mm class spl.timber.
Tile calicut pattern Gr.I.
Ridge tile calicut pattern Gr.I.
Wire nail S.W.G. 04 to 18
Wire nail S.W.G. 20 to 22
Wood preservative
Cement
Slaked lime
Sand
Carpenter for timber work
Labourer for timber work
Labourer for treating timber
Labourer for laying tiles
Mason for ridging
Labourer for ridging
Allow for colouring powder etc.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

66,950.00
69,704.00
68,446.00
68,572.00
37.00
35.00
45.00
185.00
185.00
1,000.00
749.00
395.00
2,000.00
1,000.00
650.00
650.00
650.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

3,481.40
7,249.22
10,677.58
39,908.90
7,668.62
26,250.00
855.00
671.55
168.35
11,360.00
1,123.50
592.50
460.00
10,000.00
2,600.00
1,950.00
1,950.00
1,500.00
975.00
150.00
129,591.62
18,142.83
147,734.44
2,650.33
2,650.00

G005 Roof, Gable with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 100x75 wall plates, 100x50
rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including ridging
and application of two coats wood preservative etc. - two storyed buildings.
Per 55.742 Sq.m

3.00 day

As per item No. 4


Unskilled Labour
Allow for scaffolding

650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

129,591.62
1,950.00
250.00
131,791.62
18,450.83
150,242.44
2,695.32
2,690.00

G006 Roof, Gable with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 100x75 wall plates, 100x50
rafter at 550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including ridging
and application of two coats wood preservative etc. - three storyed buildings.
Per 55.742 Sq.m
As per item No. 5
131,791.62
3.00 day
Unskilled Labour
@
650.00
1,950.00
Allow for scaffolding
250.00
Sub total
133,991.62
O.H. 14%
18,758.83
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 56 of 263

Total
Say per Sq.m.

152,750.44
2,740.31
2,740.00

G007 Roof, Gable-School type with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 150x75 wall plates,
100x50 rafter at 450mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - single storyed buildings.
Per 55.742 Sq.m
0.052
0.311
0.661
207.26
750.00
19.00
3.63
0.91
11.36
1.50
1.50
0.23
10.00
4.00
3.00
3.00
1.50
1.50

Cu.m.
Cu.m.
Cu.m.
m
No.
No.
Kg.
Kg.
Lit.
50 Kg.
Bushels
Cu.m.
day
day
day
day
day
day

Ridge plate 150 x 50 mm


Purlin 150 x 75 mm
Rafter 100 x 50mm
50mmx25mm class spl.timber.
Tile calicut pattern Gr.I.
Ridge tile calicut pattern Gr.I.
Wire nail S.W.G. 04 to 18
Wire nail S.W.G. 20 to 22
Wood preservative
Cement
Slaked lime
Sand
Carpenter for timber work
Labourer for timber work
Labourer for treating timber
Labourer for laying tiles
Mason for ridging
Labourer for ridging
Allow for colouring powder etc.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

66,950.00
68,446.00
68,572.00
37.00
35.00
45.00
185.00
185.00
1,000.00
749.00
395.00
2,000.00
1,000.00
650.00
650.00
650.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

3,481.40
21,286.71
45,326.09
7,668.62
26,250.00
855.00
671.55
168.35
11,360.00
1,123.50
592.50
460.00
10,000.00
2,600.00
1,950.00
1,950.00
1,500.00
975.00
150.00
138,368.72
19,371.62
157,740.34
2,829.83
2,820.00

G008 Roof, Gable-School type with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 150x75 wall plates,
100x50 rafter at 450mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - two storyed buildings.
Per 55.742 Sq.m

3.00 day

As per item No. 7


Unskilled Labour
Allow for scaffolding

650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

138,368.72
1,950.00
250.00
140,568.72
19,679.62
160,248.34
2,874.82
2,870.00

G009 Roof, Gable-School type with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin, 150x75 wall plates,
100x50 rafter at 450mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work including
ridging and application of two coats wood preservative etc. - three storyed buildings.
Per 55.742 Sq.m
As per item No. 8
140,568.72
3.00 day
Unskilled Labour
@
650.00
1,950.00
Allow for scaffolding
250.00
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 57 of 263

Sub total
O.H. 14%
Total
Say per Sq.m.

142,768.72
19,987.62
162,756.34
2,919.82
2,910.00

G010 Lean Roof, with calicut pattern tiles on 150x75 wall plates, 100x50 rafter at 550mm centres and 50x25
reeper at 300 centres in sp.cl.upper timber frame work including application of two coats wood preservative
etc.
Per 94.76 Sq.m
0.722
0.881
373.08
1125.00
3.18
1.54
19.32
0.16
0.25
0.28
12.00
5.00
4.00
4.00
1.50
2.50

Cu.m.
Cu.m.
m
No.
Kg.
Kg.
Lit.
50 Kg.
Bushels
Cu.m.
day
day
day
day
Hour
Hour

Wall plates 150 x 75 mm


Rafter 100 x 50mm
50mmx25mm class spl.timber.
Tile calicut pattern Gr.I.
Wire nail S.W.G. 04 to 18
Wire nail S.W.G. 20 to 22
Wood preservative
Cement
Slaked lime
Sand
Carpenter for timber work
Labourer for timber work
Labourer for treating timber
Labourer for laying tiles
Mason for ridging
Labourer for ridging
Allow for colouring powder etc.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

68,446.00
68,572.00
37.00
35.00
185.00
185.00
1,000.00
749.00
395.00
2,000.00
1,000.00
650.00
650.00
650.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

49,418.01
60,411.93
13,803.96
39,375.00
588.30
284.90
19,320.00
119.84
98.75
560.00
12,000.00
3,250.00
2,600.00
2,600.00
187.50
203.13
150.00
204,971.32
28,695.98
233,667.30
2,465.89
2,460.00

G011 Lean Roof, School type with calicut pattern tiles on 150x75 wall plates, 100x50 rafter at 450mm centres and
50x25 reeper at 300 centres in sp.cl.upper timber frame work including application of two coats wood
preservative etc.
Per 94.76 Sq.m
0.722
1.085
373.08
1125.00
3.18
1.54
19.32
0.16
0.25
0.28
12.00
5.00
4.00
4.00
1.50
2.50

Cu.m.
Cu.m.
m
No.
Kg.
Kg.
Lit.
50 Kg.
Bushels
Cu.m.
day
day
day
day
Hour
Hour

Wall plates 150 x 75 mm


Rafter 100 x 50mm
50mmx25mm class spl.timber.
Tile calicut pattern Gr.I.
Wire nail S.W.G. 04 to 18
Wire nail S.W.G. 20 to 22
Wood preservative
Cement
Slaked lime
Sand
Carpenter for timber work
Labourer for timber work
Labourer for treating timber
Labourer for laying tiles
Mason for ridging
Labourer for ridging

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

68,446.00
68,572.00
37.00
35.00
185.00
185.00
1,000.00
749.00
395.00
2,000.00
1,000.00
650.00
650.00
650.00
125.00
81.25

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 58 of 263

49,418.01
74,400.62
13,803.96
39,375.00
588.30
284.90
19,320.00
119.84
98.75
560.00
12,000.00
3,250.00
2,600.00
2,600.00
187.50
203.13

Allow for colouring powder etc.


Sub total
O.H. 14%
Total
Say per Sq.m.

150.00
218,960.01
30,654.40
249,614.41
2,634.17
2,630.00

G012 Supplying and fixing calicut pattern tiles roof on sp.cl.upper timber frame work including ridging and
application of two coats wood preservative etc. - materials available single storyed buildings
Per 55.742 Sq.m
As per item No. 1
Less for timber & tiles
Sub total
O.H. 14%
Total
Say per Sq.m.

135,590.44
102,089.54
33,500.90
4,690.13
38,191.03
685.14
680.00

G013 Supplying and fixing calicut pattern tiles roof on sp.cl.upper timber frame work including ridging and
application of two coats wood preservative etc. - materials available two storyed buildings
Per 55.742 Sq.m
As per item No. 2
Less for timber & tiles
Sub total
O.H. 14%
Total
Say per Sq.m.

137,790.44
102,089.54
35,700.90
4,998.13
40,699.03
730.13
730.00

G014 Supplying and fixing calicut pattern tiles roof on sp.cl.upper timber frame work including ridging and
application of two coats wood preservative etc. - materials available three storyed buildings
Per 55.742 Sq.m
As per item No. 3
Less for timber & tiles
Sub total
O.H. 14%
Total
Say per Sq.m.

139,990.44
102,089.54
37,900.90
5,306.13
43,207.03
775.13
770.00

G015 Lean Roof, with calicut pattern tiles in sp.cl.upper timber frame work including application of two coats wood
preservative etc. - Materials available
Per 94.76 Sq.m
As per item No. 10
Less for timber & tiles
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 59 of 263

204,971.32
163,008.90

Sub total
O.H. 14%
Total
Say per Sq.m.

41,962.42
5,874.74
47,837.15
504.82
500.00

G016 Fixing 50x25 reeper at 300 centres, laying tiles and ridging with available materials on existing frame work
Per 55.742 Sq.m
0.91
1.00
1.00
0.17
1.25
5.50
1.50

Kg.
50 Kg.
Bushels
Cu.m.
day
day
day

Wire nail S.W.G. 20 to 22


Cement
Slaked lime
Sand
Carpenter
Labourer
Mason
Allow for colouring powder etc.

@
@
@
@
@
@
@

185.00
749.00
395.00
2,000.00
1,000.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

168.35
749.00
395.00
340.00
1,250.00
5,500.00
975.00
150.00
9,527.35
1,333.83
10,861.18
194.85
190.00

G017 Calicut pattern ridge bedded in cement & lime mortar 1:1:4 coloured to match tiles.
Per 3.658 L.m.
9.00
0.06
0.33
0.33
2.00
2.00

Nos.
Cu.m.
bus.
50kg.
Hour
Hour

Ridge tiles calicut pattern Gr.I.


Sand
Slacked lime
Cement
Labourer
Mason
Allow for colouring powder

@
@
@
@
@
@

45.00
2,000.00
395.00
749.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.

405.00
120.00
130.35
247.17
162.50
250.00
150.00
1,465.02
205.10
1,670.12
456.57
456.00

G018 Calicut pattern ridging bedded in cement & lime mortar 1:1:4 coloured to match tiles (tiles available at site).
Per 3.658 L.m.
As per item 17
less tiles
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 60 of 263

1,465.02
405.00

Sub total
O.H. 14%
Total

1,060.02
148.40
1,208.42
330.35
330.00

Say per L.m.

G019 Ridging with half round or calicut pattern tiles removed and re-laid in lime cement mortar 1:1:4 & coloured to
match tiles.
Per 3.048 L.m.
0.06
0.33
0.33
2.67
2.67

Cu.m.
Cu.m.
50 kg.
Hour
Hour

Sand
Slacked lime
Cement
Labourer
Mason
Allow for colouring powder

@
@
@
@
@

2,000.00
395.00
749.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.

120.00
130.35
247.17
216.94
333.75
150.00
1,198.21
167.75
1,365.96
448.15
448.00

G020 Skylight glass 600x600mm, 5mm thick ribbed, supplied & fixed to roof including necessary lime cement
filleting.
Per No.
0.37 Sq.m.
2.00 Hour
2.00 Hour

Glass pane 5mm


Labourer
Mason
Allow for lime sand etc.

@
@
@

693.00
81.25
125.00

256.41
162.50
250.00
100.00
768.91
107.65
876.56
876.00

35.00
81.25

105.00
40.63
145.63
20.39
166.01
55.34
55.30

Sub total
O.H. 14%
Total
Say per No.
G021 Tiles, calicut pattern, flat supplied and laid up to 5 tiles in single storied building.
Per 3 tile.
3.00 Nos.
0.50 Hour

Calicut pattern flat tiles.


Labourer

@
@
Sub total
O.H. 14%
Total
Say per No.

G022 Tiles, calicut pattern, flat supplied and laid above 4 and up to 25 tiles in single storied building.
Per 15 tile.

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 61 of 263

15.00 Nos.
1.00 Hour

Calicut pattern flat tiles.


Labourer

@
@

35.00
81.25

Sub total
O.H. 14%
Total
Say per No.

525.00
81.25
606.25
84.88
691.13
46.08
46.00

G023 Tiles, calicut pattern, flat supplied and laid up to 5 tiles in building of more than one storey.
Per 3 tile.
3.00 Nos.
1.00 Hour

Calicut pattern flat tiles.


Labourer

@
@

35.00
81.25

Sub total
O.H. 14%
Total
Say per No.

105.00
81.25
186.25
26.08
212.33
70.78
70.70

G024 Tiles, calicut pattern, flat supplied and laid above 4 and up to 25 tiles in building of more than one storey.
Per 15 tile.
15.00 Nos.
2.00 Hour

Calicut pattern flat tiles.


Labourer

@
@

35.00
81.25

525.00
162.50
687.50
96.25
783.75
52.25
52.20

35.00
81.25

4,375.00
325.00
4,700.00
658.00
5,358.00
576.75
576.00

81.25

325.00
325.00
45.50

Sub total
O.H. 14%
Total
Say per No.
G025 Tiles, calicut pattern, supplied and laid in any buildings.
Per 9.29 Sq.m.
125.00 Nos.
4.00 Hour

Tiles calicut pattern Gr.I.


Labourer

@
@
Sub total
O.H. 14%
Total
Say per Sq.m.

G026 Laying calicut pattern tiles in any buildings (Tiles available at site).
Per 9.29 Sq.m.
4.00 Hour

Labourer

@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 62 of 263

Total

370.50
39.88
39.00

Say per Sq.m.


G027 Glass tiles laid in small quantities including fixing with G.I. Wire where necessary (Tiles supplied
client).
Per No.
0.50 Hour
Labourer
@
81.25
Sub total
O.H. 14%
Total
Say per No.

by the

40.63
40.63
5.69
46.31
46.00

G028 Shifting & relaying calicut pattern tiles.


Per 9.29 Sq.m.
2.67 Hour

Labourer

81.25

216.94
216.94
30.37
247.31
26.62
26.00

35.00

35.00
35.00
4.90
39.90
39.90

45.00

45.00
45.00
6.30
51.30
51.30

Sub total
O.H. 14%
Total
Say per Sq.m.
G029 Supply only calicut pattern flat tiles
Per tile.
1.00 Nos.

Calicut pattern flat tiles.

@
Sub total
O.H. 14%
Total
Say per No.

G030 Supply only calicut pattern ridge tiles


Per tile.
1.00 Nos.

Calicut pattern ridge tiles.

@
Sub total
O.H. 14%
Total
Say per No.

G031 Sorting out of available timber cut to required sizes and fixed in roof and other carpentry work.
Per 0.023 Cu.m.(100 x 75 - 3.048m)
3.00 hour
1.00 Hour

Carpenter
Labourer

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu.m
G032 Supply and fixing 200 x 100 timber beam and 100 x 100 post in spl.cl. up. timber work
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 63 of 263

375.00
81.25
456.25
63.88
520.13
22,614.13
22,610.00

Per 0.11 cu.m.


0.101
0.009
3.00
3.00

Cu.m.
Cu.m.
hour
Hour

Timber beams 200 x 100


Timber beams 100 x 100
Carpenter
Labourer
Allow for soligram

@
@
@
@

83,821.00
69,704.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu.m

8,465.92
627.34
375.00
243.75
100.00
9,812.01
1,373.68
11,185.69
101,688.07
101,680.00

G033 Supply and fixing 150 x 100 timber beam and 100 x 100 post in spl.cl. up. timber work
Per 0.085 cu.m.
0.076
0.009
2.00
2.00

Cu.m.
Cu.m.
hour
Hour

Timber beams 150 x 100


Timber beams 100 x 100
Carpenter
Labourer
Allow for soligram

@
@
@
@

69,821.00
69,704.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Cu.m

5,306.40
627.34
162.50
250.00
100.00
6,446.23
902.47
7,348.70
86,455.35
86,450.00

G034 Supply and fixing 150 x 50 timber ridge plate in spl.cl. up. timber work
Per 0.024 cu.m.
0.026 Cu.m.
0.50 hour
0.25 Hour

Timber beams 150 x 50


Carpenter
Labourer
Allow for soligram

@
@
@

66,950.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu.m

1,740.70
62.50
20.31
100.00
1,923.51
269.29
2,192.80
91,366.84
91,360.00

G035 Supply and fixing 150 x 75 timber purlin in spl.cl. up. timber work
Per 0.035 cu.m.
0.039 Cu.m.
0.50 hour
0.25 Hour

Timber beams 150 x 75


Carpenter
Labourer
Allow for soligram

@
@
@

68,446.00
125.00
81.25

Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 64 of 263

2,669.39
62.50
20.31
100.00
2,852.21
399.31

Total
Say per Cu.m

3,251.52
92,900.44
92,900.00

G036 Supply and fixing 100 x 75 timber wall plate in spl.cl. up. timber work
Per 0.024 cu.m.
0.026 Cu.m.
0.50 hour
0.25 Hour

Timber beams 100 x 75


Carpenter
Labourer
Allow for soligram

@
@
@

69,704.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu.m

1,812.30
62.50
20.31
100.00
1,995.12
279.32
2,274.43
94,768.03
94,760.00

G037 Supply and fixing 100 x 50 timber rafter in spl.cl. up. timber work
Per 0.016 cu.m.
0.017 Cu.m.
0.50 hour
0.25 Hour

Timber beams 100 x 50


Carpenter
Labourer
Allow for soligram

@
@
@

68,572.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu.m

1,165.72
62.50
20.31
100.00
1,348.54
188.80
1,537.33
96,083.23
96,080.00

G038 Supplying and fixing of 50mm x50mm reepers or runners in sp.cl.up. timber new or renewed with iron nails.
Per 15.24 m.
16.76
1.50
1.50
0.10

m.
hour
Hour
Kg.

50mm x50mm Spl.cl timber


Carpenter
Labourer
Wire nail S.W.G 20 to 22

@
@
@
@

118.00
125.00
81.25
185.00

Sub total
O.H. 14%
Total
Say per L.m

1,977.68
187.50
121.88
18.50
2,305.56
322.78
2,628.33
172.46
172.00

G039 Supplying and fixing of 50mm x25mm reepers in sp.cl.up. timber new or renewed with iron nails up to 30m
(shifting of tiles paid for separately).
Per 15.24 m.
16.76 m.
1.00 hour

50mm x25mm Spl.cl timber


Carpenter

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 65 of 263

37.00
125.00

620.12
125.00

1.00 Hour
0.06 Kg.

Labourer
Wire nail S.W.G 20 to 22

@
@

81.25
185.00

81.25
11.10
837.47
117.25
954.72
62.65
62.00

Sub total
O.H. 14%
Total
Say per L.m

G040 Supplying and fixing of 50mm x25mm reepers in sp.cl.up. timber new or renewed with iron nails above 30m
(shifting of tiles paid for separately).
Per 30.48 m.
33.53
1.50
1.50
0.11

m.
hour
Hour
Kg.

50mm x25mm Spl.cl timber


Carpenter
Labourer
Wire nail S.W.G 20 to 22

@
@
@
@

37.00
125.00
81.25
185.00

Sub total
O.H. 14%
Total
Say per L.m

1,240.61
187.50
121.88
20.35
1,570.34
219.85
1,790.18
58.73
58.00

G041 Supplying and fixing of 50mm x12mm reepers in timber new or renewed with iron nails up to 30mm.
Per 15.24 m.
16.76 m.
1.00 hour
1.00 Hour

50mm x12mm Spl.cl timber


Carpenter
Labourer
Allow for nails

@
@
@

35.00
125.00
81.25

586.60
125.00
81.25
75.00
867.85
121.50
989.35
64.92
64.00

125.00
81.25
185.00

125.00
81.25
11.10
217.35
30.43
247.78
16.26
16.20

66,950.00

1,606.80
1,606.80
224.95
1,831.75
76,323.00

Sub total
O.H. 14%
Total
Say per L.m
G042 Fixing of available reepers with wire nails.
Per 15.24 m.
1.00 hour
1.00 Hour
0.06 Kg.

Carpenter
Labourer
Wire nails S.W.G. 04 to 18

@
@
@
Sub total
O.H. 14%
Total
Say per L.m

G043 Supply only 150 x 50 ridge plate in spl.cl. up. timber


Per 0.024 cu.m.
0.024 Cu.m.

Timber beams 150 x 50

@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 66 of 263

G044 Supply only 150 x 75 purlin in spl.cl. up. Timber.


Per 0.035 cu.m.
0.035 Cu.m.
Timber beams 150 x 75

Say per Cu.m

76,320.00

2,395.61
2,395.61
335.39
2,731.00
78,028.44
78,020.00

68,446.00

Sub total
O.H. 14%
Total
Say per Cu.m
G045 Supply only 100 x 75 wall plate in spl.cl. up. Timber.
Per 0.024 cu.m.
0.024 Cu.m.

Timber beams 100 x 75

69,704.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,672.90
1,672.90
234.21
1,907.10
79,462.56
79,460.00

G046 Supply only 100 x 50 rafter in spl.cl. up. Timber.


Per 0.016 cu.m.
0.016 Cu.m.

Timber beams 100 x 50

68,572.00

Sub total
O.H. 14%
Total
Say per Cu.m

1,097.15
1,097.15
153.60
1,250.75
78,172.08
78,170.00

G047 Supplying only 50mm x50mm reepers or runners in sp.cl.up. timber.


Per 15.24 m.
15.24 m.

50mm x50mm Spl.cl timber

118.00

1,798.32
1,798.32
251.76
2,050.08
134.52
134.00

37.00

563.88
563.88
78.94
642.82
42.18

Sub total
O.H. 14%
Total
Say per L.m

G048 Supplying only 50mm x25mm reepers in sp.cl.up. Timber.


Per 15.24 m.
15.24 m.

50mm x25mm Spl.cl timber

@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 67 of 263

Say per L.m

42.00

G049 Supplying only 50mm x12mm reepers in sp.cl.up. Timber.


Per 15.24 m.
15.24 m.

50mm x1255mm Spl.cl timber

35.00

Sub total
O.H. 14%
Total
Say per L.m

533.40
533.40
74.68
608.08
39.90
39.00

G050 Supplying & fixing of corrugated aluminium sheets to roof or wall on existing frame work with hooks, bolts or
drive screws etc.
Per 27.87 Sq.m.
32.05
88.00
9.00
8.00

Sq.m.
No
hour
hour

Corrugated G.I. Sheet 24 BWG.


Drive screws and washers
Labourer
Carpenter

@
@
@
@

546.00
8.70
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

17,499.30
765.60
731.25
1,000.00
19,996.15
2,799.46
22,795.61
817.93
810.00

G051 Supplying & fixing of corrugated asbestos sheets roofing on spl.cl.up. 125 x 75 timber purlins complete
including treating timber with wood preservative. ridging measured separately.
Per 33.445 Sq.m.
39.02 Sq.m.
0.38 Cu.m.
72.00 Nos.
1.25 day
1.25 day

0.75 day
2.00 day
2.00 day
0.75 day
2.27 Lit.

Corrugated Asbestos Sheet .


Timber purlins
Roofing screws and washers
Fixing purlins
Carpenter
Labourer
Allow for spikes for purlins
Transporting and hoisting sheets
Labourer
Fixing sheets
Carpenter
Labourer
Treating timber
Labourer
Wood preservative

@
@
@

518.00
73,877.00
18.85

20,212.36
28,073.26
1,357.20

@
@

1,000.00
650.00

1,250.00
812.50
100.00

650.00

487.50

@
@

1,000.00
650.00

2,000.00
1,300.00

@
@

650.00
1,000.00

487.50
2,270.00
58,350.32
8,169.04
66,519.36
1,988.92
1,980.00

Sub total
O.H. 14%
Total
Say per Sq.m.

G052 Supplying & fixing of corrugated asbestos sheet walling on 100 x 50 sp.cl.up. timber frame work complete.
Per 9.29 Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 68 of 263

0.105 Cu.m.
10.22 Sq.m.
30.00 Nos.
1.50 day
0.75 day
0.50 day
0.50 day

Timber beams
Corrugated asbestos sheet.
Roofing screws and washers
Framing
Carpenter
Labourer
Fixing sheets
Carpenter
Labourer

@
@
@

68,572.00
518.00
18.85

7,200.06
5,293.96
565.50

@
@

1,000.00
650.00

1,500.00
487.50

@
@

1,000.00
650.00

500.00
325.00
15,872.02
2,222.08
18,094.10
1,947.70
1,940.00

Sub total
O.H. 14%
Total
Say per Sq.m.

G053 Supplying & fixing of corrugated asbestos sheets roofing on spl.cl.up. 150 x 50 ridge plate, 100 x 75 wall
plate, 150 x 75 purlin, 100 x 50 rafter at 0.9 m centres and 50 x 50 runners at max. 1.05 m centres complete
including treating timber with wood preservative. (ridging measured separately.)
Per 33.445 Sq.m.
39.02
0.062
0.031
0.062
0.26
40.00
72.00

Sq.m.
Cu.m.
Cu.m.
Cu.m.
Cu.m.
L..m.
Nos.

3.00 day
2.00 day

0.75 day
2.00 day
2.00 day
0.75 day
2.27 Lit.

Corrugated Asbestos Sheet .


Timber purlins 150 x 75
Ridge plate 150 x 50
Wall plate 100 x 75
Rafter 100 x 50
Runners 50 x 50
Roofing screws and washers
Fixing frame
Carpenter
Labourer
Allow for spikes for purlins
Transporting and hoisting sheets
Labourer
Fixing sheets
Carpenter
Labourer
Treating timber
Labourer
Wood preservative

@
@
@
@
@
@
@

518.00
68,446.00
66,950.00
69,704.00
68,572.00
118.00
18.85

20,212.36
4,243.65
2,075.45
4,321.65
17,828.72
4,720.00
1,357.20

@
@

1,000.00
650.00

3,000.00
1,300.00
100.00

650.00

487.50

@
@

1,000.00
650.00

2,000.00
1,300.00

@
@

650.00
1,000.00

487.50
2,273.00
65,707.03
9,198.98

Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 69 of 263

Total

74,906.01
2,239.68
2,230.00

Say per Sq.m.

G054 Supplying & fixing of corrugated asbestos sheets to roof or wall on existing frame work with necessary coach
screws and limpet washers or hook bolts.
Per 33.445 Sq.m.
39.02 Sq.m.
72.00 Nos.
0.75 day
2.00 day
2.00 day

Corrugated asbestos sheet.


Drive screws and washers
Hoisting sheets
Labourer
Fixing sheets
Carpenter
Labourer

@
@

518.00
18.85

20,212.36
1,357.20

650.00

487.50

@
@

1,000.00
650.00

2,000.00
1,300.00
25,357.06
3,549.99
28,907.05
864.32
860.00

Sub total
O.H. 14%
Total
Say per Sq.m.

G055 Supplying & fixing of corrugated asbestos sheets to roof or wall on existing frame work with necessary coach
screws and limpet washers or hook bolts. (sheets available)
Per 33.445 Sq.m.
As per item No. 56
Less Sheets

25,357.06
20,212.36
5,144.70
720.26
5,864.96
175.36
175.00

Sub total
O.H. 14%
Total
Say per Sq.m.
G056 Rectification of leaks (up to 5 in No.) in roofs of single storeyed building.
Per 3 leaks.
4.00 Hour

Labourer

81.25

325.00
325.00
45.50
370.50
123.50
123.00

81.25

162.50
162.50
22.75
185.25
30.88
30.00

Sub total
O.H. 14%
Total
Say per No.

G057 Rectification of leaks (above 5 in No.) in roofs of single storeyed building.


Per 6 leaks.
2.00 Hour

Labourer

@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 70 of 263

G058 Rectification of leaks (up to 5 in No.) of roof of building above one storeyed building.
Per 3 leaks.
5.00 Hour

Labourer

81.25

406.25
406.25
56.88
463.13
154.38
154.00

81.25

162.50
162.50
22.75
185.25
61.75
61.00

Sub total
O.H. 14%
Total
Say per No.

G059 Rectification of leaks (above 5 No.) in roofs of building above one storeyed building.
Per 3 leaks.
2.00 Hour

Labourer

@
Sub total
O.H. 14%
Total
Say per No.

G060 Rectification of leaks in corrugated sheet roofs with bitumen washers & G.I. Bolts & nuts.
Per 5 leaks.
5.00 No.
5.00 No.
6.00 Hour

Bitumen washers.
G.I. Bolts & nuts.
Labourer

@
@
@

3.15
18.85
81.25

Sub total
O.H. 14%
Total
Say per No.

15.75
94.25
487.50
597.50
83.65
681.15
136.23
136.00

G061 Fixing asbestos cement, aluminium alloy or G.I.ridging available at site with hook bolts or screws.
Per 30.48 L.m.
200.00 Nos.
2.00 day
2.00 day

Drive screws & washers.


Carpenter
Labourer

@
@
@

18.85
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m.

3,770.00
2,000.00
1,300.00
7,070.00
989.80
8,059.80
264.43
264.00

G062 Asbestos ridging complete with roofing screws or hooks.


Per 4.064 L.m.
4.00
16.00
2.00
2.00

Pair
Nos.
Hour
Hour

Close fitting asbestos ridging


Drive screws & washers
Carpenter
Labourer

@
@
@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 71 of 263

500.00
18.85
125.00
81.25

2,000.00
301.60
250.00
162.50
2,714.10
379.97
3,094.07

761.34
760.00

Say per L.m.


G063 S/Laying half round tiles over the existing asbestos roof.
Per 9.29 Sq.m.
320.00 Nos.
6.00 Hour

Tile half round (asbes. covering)Gr.I.


Labourer
Sub total
O.H. 14%
Total

@
@

Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - G - Page No: 72 of 263

0.00
81.25

0.00
487.50
487.50
68.25
555.75
59.82
59.00

I - CARPENTER & JOINER


I001 40mm to 50mm x 12mm plain chamfered special class timber beading fixed complete with Iron screws.
Per 30.48 L.m.
32.004 m
48.000 Nos
4.000 hour
4.000 hour

40mm to 50mmx12mm spl.Cl.


timder fillets.
Iron screws (40mm)
Unskilled Labour
Skilled Labour

57.75

1,848.23

@
@
@

1.60
81.25
125.00

76.80
325.00
500.00
2,750.03
385.00
3,135.04
102.86
102.00

Sub total
O.H. 14%
Total
Say per L.m.

I002 Beading or filletting 12 x 12mm in Halmila timber for glass panes fixed complete with brass spring of iron
panel pins.
Per 9.75 L.m.
10.670 L.m.
2.000 hour

12mmx12mm Hamila timber fillets.


Skilled Labour(carpenter)
Allow for Brass panel pin and putty.

@
@

50.00
125.00

Sub total
O.H. 14%
Total
Say per L.m.

533.50
250.00
25.00
808.50
113.19
921.69
94.53
94.00

I003 Beading or filletting 12 x 12mm in Spl.cl.up. timber for glass panes fixed complete with brass spring of iron
panel pins.
Per 9.75 L.m.
10.670 L.m.
2.000 hour

12mmx12mm sp.cl.up. timber fillets.


Skilled Labour(carpenter)
Allow for Brass panel pin and putty.

@
@

45.00
125.00

Sub total
O.H. 14%
Total
Say per L.m.

480.15
250.00
25.00
755.15
105.72
860.87
88.29
88.00

I004 Beading or filletting on under side of ceiling removed and re fixed with iron screws complete.
Per 30.48 L.m.
48.000 Nos.
6.000 hour
6.000 hour

Iron screws(40mm)
Unskilled Labour
Skilled Labour(carpenter)

@
@
@

1.60
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.
275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 73 of 263

76.80
487.50
750.00
1,314.30
184.00
1,498.30
49.16
49.00

I005 Board, barge, valance, fascia 175 x 20mm thick in Ginisappu timber fixed complete with necessary screws
Per 30.48 L.m.
5.670
48.000
4.000
16.000

Sq.m.
Nos.
hour
hour

Timber planks 25mm


50mm Iron screws.
Unskilled Labour
Skilled Labour(carpenter)

@
@
@
@

1,330.00
3.15
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.

7,541.10
151.20
325.00
2,000.00
10,017.30
1,402.42
11,419.72
374.66
374.00

I006 Board, barge, valance, fascia 200 x 20mm thick in Ginisappu timber fixed complete with necessary screws
Per 30.48 L.m.
6.510
48.000
4.000
16.000

Sq.m.
Nos.
hour
hour

Timber planks 25mm


50mm Iron screws.
Unskilled Labour
Skilled Labour(carpenter)

@
@
@
@

1,330.00
3.15
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.

8,658.30
151.20
325.00
2,000.00
11,134.50
1,558.83
12,693.33
416.45
416.00

I007 Board, barge, valance, fascia 225 x 20mm thick in Ginisappu timber fixed complete with necessary screws
Per 30.48 L.m.
7.320
48.000
4.000
16.000

Sq.m.
Nos.
hour
hour

Timber planks 25mm


50mm Iron screws.
Unskilled Labour
Skilled Labour(carpenter)

@
@
@
@

1,330.00
3.15
81.25
125.00

Sub total
O.H. 14%
Total
Say per L.m.

9,735.60
151.20
325.00
2,000.00
12,211.80
1,709.65
13,921.45
456.74
456.00

I008 Barge valance facia boards available fixed including cutting and minor repairs.
Per 30.48 L.m.
4.000 hour
8.000 hour
48.000 Nos.

Unskilled Labour
Skilled Labour(carpenter)
50mm Iron screws.

@
@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 74 of 263

81.25
125.00
3.15

325.00
1,000.00
151.20
1,476.20
206.67
1,682.87
55.21

Say per L.m.

55.00

I009 Flat asbestos ceiling fixed to 100mmx50mm joists and 50mm bearers of special class uppertimder including
40mmx12mm cover fillets and 63mmx25mm coves of special class upper timder. Rate to include 2 coats of
tarnap to joists & bearers,primer and 2 coats of emulsion paint to asbestos sheet & oil paint to beading.
Per 18.12 Sq.m.
7.500
4.000
4.000
0.227
0.454
1.515
19.520
0.113
38.100
18.258
96.000
3.031
1.137
26.000

day
day
day
Cu.m
Kg.
Lit
Sq.m.
Kg.
m
m
Nos.
Ltr.
Ltr.
No.

Unskilled Labour
Skilled Labour
Painter
Timber sp.cl.up.
Wire nailS.W.G 4 to 18(2)
Wood Preservative
Asbestos flat sheet 1220 x 1220mm
20mm GI calicut nails
31mm special cl. timber fillets
63mm x 40mm cove moulding
Iron screws (40mm)
Emulsion paint
Enamel paint
Wood plugs
Allow for scaffolding
Allow for brushes
Allow for cement & sand

@
@
@
@
@
@
@
@
@
@
@
@
@

650.00
1,000.00
1,000.00
68,572.00
185.00
1,000.00
295.00
185.00
30.00
25.20
1.60
648.00
768.00
15.00

Sub total
O.H. 14%
Total
Say per Sq.m.

4,875.00
4,000.00
4,000.00
15,565.84
83.99
1,515.00
5,758.40
20.91
1,143.00
460.10
153.60
1,964.09
873.22
390.00
100.00
100.00
100.00
41,103.14
5,754.44
46,857.58
2,585.96
2,580.00

I010 Flat asbestos ceiling fixed to 100mmx50mm joists and 50mm bearers of special class uppertimder including
40mmx12mm cover fillets and 63mmx25mm coves of special class upper timder.
Per 18.12 Sq.m.
5.500
4.000
0.227
0.454
1.515
19.520
0.113
38.100
18.258
96.000
26.000

day
day
Cu.m
Kg.
Lit
Sq.m.
Kg.
m
m
Nos.
No.

Unskilled Labour
Skilled Labour
Timber sp.cl.up.
Wire nailS.W.G 4 to 18(2)
Wood Preservative
Asbestos flat sheet 1220 x 1220mm
20mm GI calicut nails
31mm special cl. timber fillets
63mm x 40mm cove moulding
Iron screws (40mm)
Wood plugs
Allow for scaffolding
Allow for cement & sand

@
@
@
@
@
@
@
@
@
@

650.00
1,000.00
68,572.00
185.00
1,000.00
295.00
105.00
30.00
25.20
1.60
15.00

Sub total
O.H. 14%
Total
275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 75 of 263

3,575.00
4,000.00
15,565.84
83.99
1,515.00
5,758.40
11.87
1,143.00
460.10
153.60
390.00
100.00
100.00
32,856.80
4,599.95
37,456.75

Say per Sq.m.

2,067.15
2,060.00

I011 Asbestos ceiling or partition fixed with clout headed nails to existing beareres or frames (beading or cover
fillets paid separately).
Per 18.59 Sq.m.
19.520 Sq.m.
12.000 hour
8.000 hour
0.113 kg.

Asbestos plain celling sheet


1220x1220mm
Unskilled Labour
Skilled Labour(carpenter)
G.I. Clout nails
Allow for scaffolding

295.00

5,758.40

@
@
@

81.25
125.00
105.00

975.00
1,000.00
11.87
100.00
7,845.27
1,098.34
8,943.60
481.10
481.00

Sub total
O.H. 14%
Total
Say per Sq.m.

I012 Ceiling, supplying and fixing 12mm thick lunumidilla planks lapped & nailed to frame work consisting of
100x50mm joists and 50x50mm bearers in sp.cl.up.timber. Rate to include for 2 coats of tarnap to joists and
bearers.
Per 9.29 Sq.m
0.113
0.227
17.000
21.000
1.515
12.084

Cu.m.
Kg.
Hour
Hour
Lit
Sq.m

Timber
Wire nail S.W.G 20 to22
Skilled Labour
Unskilled Labour
Wood Preservative
Lunumidella 150x12mm
Allow for scaffolding
Allow for cement & sand.

@
@
@
@
@
@

68,572.00
185.00
125.00
81.25
1,000.00
645.00

Sub total
O.H. 14%
Total
Say per Sq.m.

7,748.64
42.00
2,125.00
1,706.25
1,515.00
7,794.18
100.00
50.00
21,081.06
2,951.35
24,032.41
2,586.91
2,580.00

I013 Ceiling, supplying and fixing 20mm thick lunumidilla planks lapped & nailed to frame work consisting of
100x50mm joists and 50x50mm bearers in sp.cl.up.timber. Rate to include for 2 coats of tarnap to joists and
bearers.
Per 9.29 Sq.m
0.113
0.227
17.000
21.000
1.515
12.084

Cu.m.
Kg.
Hour
Hour
Lit
Sq.m

Timber
Wire nail S.W.G 20 to22
Skilled Labour
Unskilled Labour
Wood Preservative
Lunumidella 150x20mm
Allow for scaffolding
Allow for cement & sand.

@
@
@
@
@
@

68,572.00
185.00
125.00
81.25
1,000.00
700.00

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 76 of 263

7,748.64
42.00
2,125.00
1,706.25
1,515.00
8,458.80
100.00
100.00

Sub total
O.H. 14%
Total
Say per Sq.m.

21,795.68
3,051.40
24,847.08
2,674.60
2,670.00

I014 Lunmidella ceiling boards of 150mmx20mm renewed in small quantities.


Per 0.70 Sq.m
0.790 Sq.m
1.000 hour
1.000 hour

Lunumidella 150x20mm
Unskilled Labour
Skilled Labour(carpenter)
Allow for Nails

@
@
@

700.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

553.00
81.25
125.00
25.00
784.25
109.80
894.05
1,277.21
1,277.00

I015 Lunmidella ceiling fixed with wire nails (boards available at site).
Per 9.29 Sq.m
0.340 Kg.
8.000 hour
8.000 hour

Wire nailS.W.G 4 to 18(2)


Unskilled Labour
Skilled Labour(carpenter)
Allow for scaffolding

@
@
@

185.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

62.90
650.00
1,000.00
100.00
1,812.90
253.81
2,066.71
222.47
222.00

I016 20mm Lunmidella ceiling or partition beaded and rebated nailed to under side of existing joists rafters or
frames above 10m2 (fillets or beading paid for separately).
Per 9.29 Sq.m
10.225
0.340
8.000
8.000

Sq.m
Kg.
hour
hour

Lunumidella 150x20mm
Wire nailS.W.G 4 to 18(2)
Unskilled Labour
Skilled Labour(carpenter)
Allow for scaffolding

@
@
@
@

700.00
185.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

7,157.50
62.90
650.00
1,000.00
100.00
8,970.40
1,255.86
10,226.26
1,100.78
1,100.00

I017 20mm Lunmidella ceiling or partition beaded and rebated nailed to under side of existing joists rafters or
frames upto 10 Sq.m(fillets or beading paid for separately).
Per 9.29 Sq.m

10.250 Sq.m

Lunumidella 150x20mm

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 77 of 263

700.00

7,175.00

0.340 Kg.
10.000 hour
10.000 hour

Wire nailS.W.G 4 to 18(2)


Unskilled Labour
Skilled Labour(carpenter)
Allow for scaffolding

@
@
@

185.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

62.90
812.50
1,250.00
100.00
9,400.40
1,316.06
10,716.46
1,153.55
1,153.00

I018 Ceiling openings 600mmx450mm approx. formed complete with 50mmx50mm bearers(glass tiles or sheets
paid for separately).
Per No.
0.325
0.003
4.000
4.000

Sq.m
Cu.m
hour
hour

Lunumidella 150x20mm
Timber
Unskilled Labour
Skilled Labour(carpenter)
Allow for scaffolding & Nails

@
@
@
@

700.00
68,572.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per No.

227.50
205.72
325.00
500.00
100.00
1,358.22
190.15
1,548.37
1,548.00

I019 Cleaning of ceiling upper side and cleaning away the debris.
Per 9.29 Sq.m
2.000 hour

Unskilled Labour

81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

162.50
162.50
22.75
185.25
19.94
19.90

I020 Cove moulding with special upper 63x40 timber fixed with Iron screws and plugs new or renewed.
Per 15.24 L.m.

16.764
20.000
18.000
6.000
3.500

m
No.
No.
hour
hour

Cove moulding (63mmx40mm)


spl.upper.
Wood plugs
50mm Iron screws
Unskilled Labour
Skilled Labour(carpenter)
Allow for cement and sand.

@
@
@
@
@
Sub total

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 78 of 263

25.20
15.00
3.15
81.25
125.00

422.45
300.00
56.70
487.50
437.50
100.00
1,804.15

O.H. 14%
Total
Say per L.m

252.58
2,056.73
134.96
134.00

I021 Supplying and fixing of doors and windows ledged braced and battended with grooved and tongued joints
100mmx75mm frames and 25mm thick sashes in spl.cl.upper timber complete with iron oxi. fittings and lock.
Per 1.51 Sq.m.
0.043
1.952
60.000
6.000
6.000
3.000
1.000
2.000
4.000
11.000
19.000

Cu.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
hour
hour

Timber for frames


Timber plank 28mm spl. class.
Iron screws (40mm)
Iron Screw 25mm
Rall plugs & 50mm screws
Hinge Butt 100mm
Night latch Lock
Spur stone
Holdfast
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,844.00
1.60
1.35
8.15
150.00
960.00
61.00
50.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,997.27
3,599.49
96.00
8.10
48.90
450.00
960.00
122.00
200.00
893.75
2,375.00
25.00
11,775.51
1,648.57
13,424.08
8,890.12
8,890.00

I022 Supplying and fixing of doors and windows ledged braced and battended with grooved and tongued joints
25mm thick sashes in spl.cl.upper timber complete with iron oxi. fittings and lock.
Per 1.338 Sq.m.
1.952
60.000
6.000
3.000
1.000
5.000
13.000

Sq.m.
No.
No.
No.
No.
hour
hour

Timber plank 25mm sp.cl. up.


Screws iron (40mm)
Iron Screw 25mm
Hinge Butt 100mm
Night latch Lock
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@

1,844.00
1.60
1.35
150.00
960.00
81.25
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 79 of 263

3,599.49
96.00
8.10
450.00
960.00
406.25
1,625.00
25.00
7,169.84
1,003.78
8,173.62
6,108.83
6,100.00

I023 Supplying and fixing of doors and windows ledged braced and battended with grooved and tongued joints
25mm thick sashes in spl.cl.upper timber complete with available iron oxi. fittings and lock.
Per 1.338 Sq.m.
As in item No. 22
Less for fittings
Sub total
O.H. 14%
Total
Say per Sq.m.

7,169.84
1,410.00
5,759.84
806.38
6,566.22
4,907.49
4,900.00

I024 Garage door, frame & battened Supplying and fixing of 31mm thick sash and 125mm x 100mm frames in Sp.
Cl. Up. timber with iron pintels and strap hinges for doors.
Per 5.203 Sq.m.
0.113
3.067
3.346
6.000
6.000
24.000
1.000
1.000
18.000
2.000
1.000
3.500
9.000

Cu.m.
Cu.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
day
day

Timber
Timber plank 38mm special.
20mm thick planks of spl. class .
Holdfasts.
Pintels & stay hinges 50x6x1000mm
Bolt & nut iron 50 x 10mm
Tower bolt iron oxi. 300mm
Tower bolt iron oxi. 150mm
Screws iron 25mm
Spur stone
Hasp & staple
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
2,500.00
1,314.00
50.00
315.00
21.88
150.00
133.00
1.35
61.00
179.00
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

7,876.55
7,667.50
4,396.64
300.00
1,890.00
525.00
150.00
133.00
24.30
122.00
179.00
2,275.00
9,000.00
25.00
34,564.00
4,838.96
39,402.96
7,573.12
7,570.00

I025 Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x 75mm frames in special
upper timber for doors with iron oxi. fittings & motice lock union English
Per 2.601 Sq.m
0.057
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000

Cu.m.
Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.

Timber
Timber plank 31mm
20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm

@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,314.00
66.15
45.00
1,028.00
224.50
150.00
133.00

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 80 of 263

3,973.13
2,148.13
855.41
282.26
617.22
956.04
1,347.00
150.00
133.00

2.000
2.000
6.000
1.000
48.000
24.000
2.375
7.750

No.
No.
No.
No.
No.
No.
day
day

Spur stone
Hold fast
Rawl pluge & screws
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper & dowels.

@
@
@
@
@
@
@
@

61.00
50.00
8.15
3,000.00
1.60
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

122.00
100.00
48.90
3,000.00
76.80
32.40
1,543.75
7,750.00
50.00
23,186.05
3,246.05
26,432.09
10,162.28
10,160.00

I026 Supplying and fixing of glazed and panelled 28mm thick sash in special upper timber for doors with iron oxi.
fittings & motice lock union English
Per 2.295 Sq.m
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
1.000
48.000
24.000
2.000
7.000

Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
day
day

Timber plank 31mm


20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Motice lock
40mm screws
25mm Iron screws.
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@
@
@
@
@
@
@

1,284.00
1,314.00
66.15
45.00
1,028.00
224.50
150.00
133.00
3,000.00
1.60
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,148.13
855.41
282.26
617.22
956.04
1,347.00
150.00
133.00
3,000.00
76.80
32.40
1,300.00
7,000.00
50.00
17,948.27
2,512.76
20,461.03
8,915.48
8,910.00

I027 Supplying and fixing of glazed and panelled 28mm thick sash in special upper timber for doors with available
iron oxi. Fittings.
Per 2.295 Sq.m
1.673
0.651
4.267
13.716
0.930

Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.

Timber plank 31mm


20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm

@
@
@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 81 of 263

1,284.00
1,314.00
66.15
45.00
1,028.00

2,148.13
855.41
282.26
617.22
956.04

48.000
24.000
2.000
7.000

No.
No.
day
day

40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@

1.60
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

76.80
32.40
1,300.00
7,000.00
50.00
13,318.27
1,864.56
15,182.83
6,615.61
6,610.00

I028 Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x 75mm frames in special
upper timber for doors with iron oxi. fittings & motice lock Volvo Indian
Per 2.601 Sq.m
0.057
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
2.000
2.000
6.000
1.000
48.000
24.000
2.375
7.750

Cu.m.
Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
No.
day
day

Timber
Timber plank 31mm
20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Hold fast
Spur stone
Rawl pluge & screws
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper, dowels.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,314.00
66.15
45.00
1,028.00
224.50
150.00
133.00
50.00
61.00
8.15
575.00
1.60
1.35
650.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

3,973.13
2,148.13
855.41
282.26
617.22
956.04
1,347.00
150.00
133.00
100.00
122.00
48.90
575.00
76.80
32.40
1,543.75
968.75
50.00
13,979.80
1,957.17
15,936.97
6,127.25
6,120.00

I029 Supplying and fixing of glazed and panelled 28mm thick sash in special upper timber for doors with iron oxi.
fittings & motice lock Volvo Indian.
Per 2.295 Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 82 of 263

1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
1.000
48.000
24.000
2.000
7.000

Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
day
day

Timber plank 31mm


20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@
@
@
@
@
@
@

1,284.00
1,314.00
66.15
45.00
1,028.00
224.50
175.00
133.00
575.00
1.60
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,148.13
855.41
282.26
617.22
956.04
1,347.00
175.00
133.00
575.00
76.80
32.40
1,300.00
7,000.00
50.00
15,548.27
2,176.76
17,725.03
7,723.32
7,720.00

I030 Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x 75mm frames in special
upper timber for doors with Iron oxi. fittings & motice lock union English
Per 2.601 Sq.m
0.057
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
2.000
2.000
6.000
1.000
48.000
24.000
2.375
7.750

Cu.m.
Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
No.
day
day

Timber
Timber plank 31mm
20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Hold fast
Spur stone
Rawl pluge & screws
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper, dowels.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,314.00
66.15
45.00
1,028.00
759.00
286.00
133.00
50.00
61.00
22.00
3,000.00
11.00
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

3,973.13
2,148.13
855.41
282.26
617.22
956.04
4,554.00
286.00
133.00
100.00
122.00
132.00
3,000.00
528.00
32.40
1,543.75
7,750.00
50.00
27,063.35
3,788.87
30,852.21
11,861.67
11,860.00

I031 Supplying and fixing of glazed and panelled 28mm thick sash in special upper timber for doors with brass
fittings & motice lock union English
Per 2.295 Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 83 of 263

1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
1.000
48.000
24.000
2.000
7.000

Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
day
day

Timber plank 31mm


20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@
@
@
@
@
@
@

1,284.00
1,314.00
66.15
45.00
1,028.00
759.00
286.00
133.00
3,000.00
1.60
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,148.13
855.41
282.26
617.22
956.04
4,554.00
286.00
133.00
3,000.00
76.80
32.40
1,300.00
7,000.00
50.00
21,291.27
2,980.78
24,272.05
10,576.05
10,570.00

I032 Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x 75mm frames in special
upper timber for doors with Iron oxi. fittings & motice lock Volvo Indian
Per 2.601 Sq.m
0.057
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
2.000
2.000
6.000
1.000
48.000
24.000
2.375
7.750

Cu.m.
Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
No.
day
day

Timber
Timber plank 31mm
20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Hold fast
Spur stone
Rawl pluge & screws
Motice lock
40mm screws
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sandpaper dowels.

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,314.00
66.15
45.00
1,028.00
449.00
286.00
133.00
50.00
61.00
22.00
575.00
11.00
1.35
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 84 of 263

3,973.13
2,148.13
855.41
282.26
617.22
956.04
2,694.00
286.00
133.00
100.00
122.00
132.00
575.00
528.00
32.40
1,543.75
7,750.00
50.00
22,778.35
3,188.97
25,967.31
9,983.59
9,980.00

I033 Supplying and fixing of glazed and panelled 28mm thick sash in special upper timber for doors with brass
fittings & motice lock Volvo Indian.
Per 2.295 Sq.m
1.673
0.651
4.267
13.716
0.930
6.000
1.000
1.000
1.000
48.000
24.000
2.000
7.000

Sq.m.
Sq.m.
L.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
day
day

Timber plank 31mm


20mm thick planks
40mmx40mm timber sash bars.
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 125mm
Bolt skeleton 300mm
Bolt barrel 150mm
Motice lock
40mm screws
25mm Iron screws.
Unskilled Labour
Skilled Labour
Allow for sand paper etc.

@
@
@
@
@
@
@
@
@
@
@
@
@

1,284.00
1,314.00
66.15
45.00
1,028.00
449.00
286.00
133.00
3,000.00
11.00
1.35
650.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,148.13
855.41
282.26
617.22
956.04
2,694.00
286.00
133.00
3,000.00
528.00
32.40
1,300.00
875.00
50.00
13,757.47
1,926.05
15,683.51
6,833.77
6,830.00

I034 Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x 75mm frames in special
upper timber with iron oxi. fittings & motice lock union English
Per 1.951 Sq.m
0.043
0.813
1.208
2.000
2.000
2.000
3.000
1.000
18.000
6.000
9.000
7.750
6.250

Cu.m.
Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
hr.
day

Timber
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Hold fast
Spur stone
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,643.00
133.00
50.00
61.00
297.00
3,000.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 85 of 263

2,997.27
1,043.89
1,984.74
266.00
100.00
122.00
891.00
3,000.00
56.70
8.10
11.25
629.69
6,250.00
50.00
17,410.65
2,437.49
19,848.14
10,173.31
10,170.00

I035 Doors fully panelled supplying and fixing of 28mm thick sash in special upper timber with iron oxi. fittings &
motice lock union English
Per 1.693 Sq.m
0.813
1.208
2.000
3.000
1.000
18.000
6.000
9.000
4.750
5.500

Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
hr.
day

Timber plank 31mm


25mm thick planks
Bolt barrel 150mm
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

@
@
@
@
@
@
@
@
@
@

1,284.00
1,643.00
133.00
297.00
3,000.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,043.89
1,984.74
266.00
891.00
3,000.00
56.70
8.10
11.25
385.94
5,500.00
50.00
13,197.62
1,847.67
15,045.29
8,886.76
8,880.00

I036 Doors fully panelled supplying and fixing of 28mm thick sash in special upper timber with available iron oxi.
Fittings.
Per 1.693 Sq.m
0.813
1.208
18.000
6.000
9.000
4.750
5.500

Sq.m.
Sq.m.
No.
No.
No.
hr.
day

Timber plank 31mm


25mm thick planks
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

@
@
@
@
@
@
@

1,284.00
1,643.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,043.89
1,984.74
56.70
8.10
11.25
385.94
5,500.00
50.00
9,040.62
1,265.69
10,306.31
6,087.60
6,080.00

I037 Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x 75mm frames in special
upper timber with iron oxi. fittings & motice lock Volvo Indian
Per 1.951 Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 86 of 263

Timber
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Hold fast
Spur stone
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.043
0.813
1.208
2.000
2.000
2.000
3.000
1.000
18.000
6.000
9.000
7.750
6.250

Cu.m.
Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,643.00
133.00
50.00
61.00
297.00
575.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,997.27
1,043.89
1,984.74
266.00
100.00
122.00
891.00
575.00
56.70
8.10
11.25
629.69
6,250.00
50.00
14,985.65
2,097.99
17,083.64
8,756.35
8,750.00

I038 Doors fully panelled supplying and fixing of 28mm thick sash in special upper timber with iron oxi. fittings &
motice lock Volvo Indian
Per 1.693 Sq.m
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.813
1.208
2.000
3.000
1.000
18.000
6.000
9.000
4.750
5.500

Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@

1,284.00
1,643.00
133.00
297.00
575.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 87 of 263

1,043.89
1,984.74
266.00
891.00
575.00
56.70
8.10
11.25
385.94
5,500.00
50.00
10,772.62
1,508.17
12,280.79
7,253.86
7,250.00

I039 Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x 75mm frames in special
upper timber with brass fittings & motice lock union English
Per 1.951 Sq.m
Timber
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Hold fast
Spur stone
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.043
0.813
1.208
2.000
2.000
2.000
3.000
1.000
18.000
6.000
9.000
7.750
6.250

Cu.m.
Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,643.00
133.00
50.00
61.00
484.50
3,000.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,997.27
1,043.89
1,984.74
266.00
100.00
122.00
1,453.50
3,000.00
56.70
8.10
11.25
629.69
6,250.00
50.00
17,973.15
2,516.24
20,489.39
10,501.99
10,500.00

I040 Doors fully panelled supplying and fixing of 28mm thick sash in special upper timber with brass fittings &
motice lock union English
Per 1.693 Sq.m
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.813
1.208
2.000
3.000
1.000
18.000
6.000
9.000
4.750
5.500

Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@

1,284.00
1,643.00
133.00
484.50
3,000.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 88 of 263

1,043.89
1,984.74
266.00
1,453.50
3,000.00
56.70
8.10
11.25
385.94
5,500.00
50.00
13,760.12
1,926.42
15,686.54
9,265.53
9,260.00

I041 Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x 75mm frames in special
upper timber with brass fittings & motice lock Volvo Indian
Per 1.951 Sq.m
Timber
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Hold fast
Spur stone
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.043
0.813
1.208
2.000
2.000
2.000
3.000
1.000
18.000
6.000
9.000
7.750
6.250

Cu.m.
Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,643.00
133.00
50.00
61.00
969.00
575.00
3.15
1.35
1.35
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,997.27
1,043.89
1,984.74
266.00
100.00
122.00
2,907.00
575.00
56.70
8.10
12.15
629.69
6,250.00
50.00
17,002.55
2,380.36
19,382.90
9,934.85
9,930.00

I042 Door fully panelled supplying and fixing of 28mm thick sash in special upper timber with brass fittings &
motice lock Volvo Indian
Per 1.693 Sq.m
Timber plank 31mm
25mm thick planks
Bolt barrel 150mm
Butt hinges 150mm
Motice lock
50mm screws
25mm screws.
20mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper dowels.

0.813
1.208
2.000
3.000
1.000
18.000
6.000
9.000
4.750
5.500

Sq.m.
Sq.m.
No.
No.
No.
No.
No.
No.
hr.
day

@
@
@
@
@
@
@
@
@
@

1,284.00
1,643.00
133.00
484.50
575.00
3.15
1.35
1.25
81.25
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,043.89
1,984.74
266.00
1,453.50
575.00
56.70
8.10
11.25
385.94
5,500.00
50.00
11,335.12
1,586.92
12,922.04
7,632.63
7,630.00

I043 Window glazed supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special upper
timber with iron oxi. Fittings.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 89 of 263

Per 2.926 Sq.m


Timber
Timber plank 31mm
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 100mm
Casement stays
Bolt barrel 150mm
Casement fastners
Rings
Hold fast
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

0.085
1.115
15.240
1.672
6.000
3.000
6.000
3.000
3.000
4.000
7.000
3.125
9.125

Cu.m.
Sq.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
No.
doz.
day
day

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
45.00
968.00
150.00
176.00
133.00
84.00
64.00
50.00
16.20
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

5,924.84
1,431.66
685.80
1,618.50
900.00
528.00
798.00
252.00
192.00
200.00
113.40
2,031.25
9,125.00
25.00
23,825.45
3,335.56
27,161.01
9,282.64
9,280.00

I044 Window glazed supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special upper
timber with iron oxi. Fittings and 16mm dia MS bar at approx. 100mm centers horizondaly.
Per 2.926 Sq.m
As per item No. 43
16mm dia ms bar

37.100 kg.
Sub total
O.H. 14%
Total

39.92

Say per Sq.m.

23,825.45
1,480.89
25,306.34
3,542.89
28,849.23
9,859.61
9,850.00

I045 Window glazed supplying and fixing 28mm thick sash in special upper timber with iron oxi. Fittings.
Per 2.372 Sq.m
Timber plank 31mm
12mmx12mm timber fillets.
Glass pane clear 3mm
Butt hinges 100mm
Casement stays
Bolt barrel 150mm
Casement fastners
Rings
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

1.115
15.240
1.672
6.000
3.000
6.000
3.000
3.000
7.000
1.625
7.875

Sq.m.
L.m.
Sq.m.
No.
No.
No.
No.
No.
doz.
day
day

@
@
@
@
@
@
@
@
@
@
@

Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 90 of 263

1,284.00
45.00
968.00
150.00
176.00
133.00
84.00
64.00
16.20
650.00
1,000.00

1,431.66
685.80
1,618.50
900.00
528.00
798.00
252.00
192.00
113.40
1,056.25
7,875.00
25.00
15,475.61
2,166.58
17,642.19
7,437.69

Say per Sq.m.

7,430.00

I046 Window glazed supplying and fixing 28mm thick sash in special upper timber with available iron oxi. Fittings.
Per 2.372 Sq.m
Timber plank 31mm
12mmx12mm timber fillets.
Glass pane clear 3mm
25mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

1.115
15.240
1.672
7.000
1.625
7.875

Sq.m.
L.m.
Sq.m.
doz.
day
day

@
@
@
@
@
@

1,284.00
45.00
968.00
16.20
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,431.66
685.80
1,618.50
113.40
1,056.25
7,875.00
25.00
12,805.61
1,792.78
14,598.39
6,154.46
6,150.00

I047 Window fully paneled supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special
upper timber with iron oxi. Fittings.
Per 2.230 Sq.m
Timber
Timber plank 31mm
Timber plank 25 mm
Butt hinges 100mm
Casement stays
Bolt barrel 150mm
Casement fastners
Rings
Hold fast
20mm screws.
50mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

0.071
1.139
1.115
6.000
3.000
6.000
3.000
3.000
2.000
5.500
4.250
3.281
6.875

Cu.m.
Sq.m.
L.m.
No.
No.
No.
No.
No.
No.
doz.
doz.
day
day

@
@
@
@
@
@
@
@
@
@
@
@
@

69,704.00
1,284.00
1,643.00
150.00
176.00
133.00
84.00
64.00
50.00
15.00
19.20
650.00
1,000.00

Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 91 of 263

4,948.98
1,462.48
1,831.95
900.00
528.00
798.00
252.00
192.00
100.00
82.50
81.60
2,132.65
6,875.00
25.00
20,210.16
2,829.42

Total
Say per Sq.m.

23,039.58
10,331.65
10,330.00

I048 Window fully paneled supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special
upper timber with iron oxi. Fittings and 16mm dia MS bar at approx. 100mm centers horizondaly
Per 2.230 Sq.m
As per item No. 47
16mm dia ms bar

28.900 kg.
Sub total
O.H. 14%
Total

39.92

Say per Sq.m.

20,210.16
1,153.58
21,363.74
2,990.92
24,354.66
10,921.37
10,920.00

I049 Window fully paneled supplying and fixing 28mm thick sash in special upper timber with iron oxi. Fittings.
Per 2.372 Sq.m
Timber plank 31mm
Timber plank 25mm
Butt hinges 100mm
Casement stays
Bolt barrel 150mm
Casement fastners
Rings
20mm screws.
50mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

1.139
1.115
6.000
3.000
6.000
3.000
3.000
5.500
4.250
1.781
5.625

Sq.m.
Sq.m.
No.
No.
No.
No.
No.
doz.
doz.
day
day

@
@
@
@
@
@
@
@
@
@
@

1,284.00
1,643.00
150.00
176.00
133.00
84.00
64.00
15.00
19.20
650.00
1,000.00

Sub total
O.H. 14%
Total

1,462.48
1,831.95
900.00
528.00
798.00
252.00
192.00
82.50
81.60
1,157.65
5,625.00
25.00
12,936.17
1,811.06
14,747.23
6,217.22
6,210.00

Say per Sq.m.


I050 Window fully paneled supplying and fixing 28mm thick sash in special upper timber with available iron oxi.
Fittings.
Per 2.372 Sq.m
Timber plank 31mm
Timber plank 25mm
20mm screws.
50mm screws.
Unskilled Labour
Skilled Labour
Allow for sand paper.

1.139
1.115
5.500
4.250
1.781
5.625

Sq.m.
Sq.m.
doz.
doz.
day
day

@
@
@
@
@
@

1,284.00
1,284.00
15.00
19.20
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,462.48
1,431.66
82.50
81.60
1,157.65
5,625.00
25.00
9,865.89
1,381.22
11,247.11
4,741.61
4,740.00

I051 Fanlight glazed supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special upper
timber with iron oxi. Fittings.
275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 92 of 263

Fanlight glazed supplying and fixing 28mm thick sash and with 100mm x 75mm frames in special upper
timber with iron oxi. Fittings.
Per 0.27 Sq.m
As per item No 65
As per item No 63
Less Fittings
20mm screws.
Fanlight catch
Center piovet
Allow for sand paper

2.400
0.135
0.135
1.500
1.000
2.000

L.m.
Sq.m.
Sq.m.
doz.
No.
No.

@
@
@
@
@
@

981.73
734.00
1,125.63
15.00
175.00
110.00
15.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,356.16
99.09
151.96
22.50
175.00
220.00
25.00
3,049.71
426.96
3,476.67
12,876.55
12,870.00

I052 Removing easing and refixing of doors or windows.


Per No.
Unskilled Labour
Skilled Labour

1.500 hour
1.500 hour

@
@

81.25
125.00

121.88
187.50
309.38
43.31
352.69
352.00

125.00

125.00
125.00
17.50
142.50
142.00

Sub total
O.H. 14%
Total
Say per No.

I053 Easing of doors and windows.


Per No.
Skilled Labour(carpenter)

1.000 hour
Sub total
O.H. 14%
Total

Say per No.

I054 Altering door or window frame by filling existing rebate using sp.cl.up. timber and rechanging screws and
sashes rehung on opposite side.
Per No.
32mm x12mm special class timber fillets
screws iron 31mm gauge 8
screws iron 25mmxgauge8
Skilled Labour
Unskilled Labour

6.401
1.500
1.000
12.000
4.000
Sub total
O.H. 14%
Total

L.m.
Doz.
Doz.
hour
hour

@
@
@
@
@

Say per No.

I055 Renewing of qlazing bars in door or window sash 31 x 31mm in sp.cl.up.


275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 93 of 263

60.00
19.20
16.20
125.00
81.25

384.06
28.80
16.20
1,500.00
325.00
2,254.06
315.57
2,569.63
2,560.00

Per 1.829 m
40mm x40mm spl.class timber bars
Unskilled Labour
Skilled Labour(carpenter)

2.134 L.m.
2.000 hour
6.000 hour

@
@
@

66.15
81.25
125.00

141.16
162.50
750.00
1,053.66
147.51
1,201.18
656.74
656.00

125.00
81.25

375.00
243.75
20.00
638.75
89.43
728.18
728.00

125.00
81.25

250.00
162.50
412.50
57.75
470.25
470.00

Sub total
O.H. 14%
Total
Say per m.

I056 Fixing of door or window sashes to position (sash and fittings supplied by Department.
Per No.
Skilled Labour
Unskilled Labour
Allow for screws etc.

3.000 hour
3.000 hour

@
@

Sub total
O.H. 14%
Total
Say per No.

I057 Removing and refixing of door sashes in new position.


Per No.
Skilled Labour
Unskilled Labour

2.000 hour
2.000 hour

@
@

Sub total
O.H. 14%
Total
Say per No.

I058 Supplying and fixing of louver blades with 10mm minimum thickness in spl.cl.up. Timber upto 100mm width.
Per 1.52 m.
12mm thick spl.cl. Timber planks.
Skilled Labour
Allow for nails etc.

0.186 Sq.m.
2.000 hour

@
@

Sub total
O.H. 14%
Total
Say per m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 94 of 263

788.00
125.00

146.57
250.00
25.00
421.57
59.02
480.59
316.18
316.00

I059 Supplying and fixing of louver blades with 10mm minimum thickness over 100mm and up to 150mm wide in
sp.cl.up. timber.
Per 1.52 m.
12mm thick Timber planks.
Skilled Labour
Allow for nails etc.

0.232 Sq.m
2.000 hour

@
@

788.00
125.00

Sub total
O.H. 14%
Total
Say per m.

182.82
250.00
25.00
457.82
64.09
521.91
343.36
343.00

I060 Fixing of glazed and 12mm plywood panelled partition in sp.cl.up. timber with main post 100mm
x100mmx3000mm, intermediate posts 100mmx50mm x2130mm approx. and 40mmx200mm capping
complete.
Per 6.503 Sq.m.

Timber
Timber plank 25mm spl cl.
Plywood board 12mm (Luckply)
32mm x32mm spl.cl.timber.
20mmx20mm spl. cl.I tim.battens
Skilled Labour
Unskilled Labour
Glass pane clear 3mm
Screws Brass 50mmxGuage 8
Wire nail S.W.G. 20 to 22.
Allow for plugs, screws,cement, etc.
Allow for sand paper etc.

0.156
2.324
2.324
48.920
21.946
23.750
10.000
2.789
6.000
0.227

Cu.m.
Sq.m.
Sq.m.
m
m
day
day
Sq.m.
Doz.
Kg.

@
@
@
@
@
@
@
@
@
@

68,572.00
1,643.00
1,175.90
57.75
50.00
1,000.00
650.00
1,028.00
37.80
185.00

Sub total
O.H. 14%
Total
Say per Sq.m.

10,697.23
3,818.33
2,732.79
2,825.13
1,097.30
23,750.00
6,500.00
2,867.09
226.80
42.00
100.00
25.00
54,681.67
7,655.43
62,337.11
9,585.90
9,580.00

I061 Supplying of 3 ply plywood panels and fixing to existing frames (beading paid for separately)
Per 1.115 Sq.m.
Plywood board lukply M.R 6mm
Skilled Labour
Allow for nails etc.

1.115 .Sqm.
2.000 hour

@
@

1,302.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 95 of 263

1,451.73
250.00
25.00
1,726.73
241.74
1,968.47
1,765.45
1,760.00

I062 Renewing of trellis laths 12mmx12mm in sp.cl.up. local timber in quantities over 30m.
Per 30.48 m.
16mm x16mmspl.class timber
Wire nail S.W.G 20 to 22
Skilled Labour

33.528 m.
0.113 Kg.
4.000 Hour
Sub total
O.H. 14%
Total

@
@
@

45.00
185.00
125.00

1,508.76
20.91
500.00
2,029.67
284.15
2,313.82
75.91
75.00

55.00
125.00
185.00

1,844.04
625.00
42.00
2,511.04
351.54
2,862.58
93.92
93.00

69,704.00
61.00
50.00
125.00
81.25

2,997.27
122.00
200.00
1,125.00
731.25
100.00
25.00
5,300.52
742.07
6,042.60
1,321.65
1,321.00

Say per m.
I063 Supplying and fixing of trellis laths 25mmx25mm in local timber.
Per 30.48 m.
28mmx28mm class timber
Skilled Labour
Wire nails S.W.G. 20 to 22

33.528 m.
5.000 Hour
0.227 Kg.
Sub total
O.H. 14%
Total

@
@
@

Say per m.
I064 Supplying and fixing in position 100mmx75mm door frame in spl.cl.up. timber.
Per 4.572 m
Timber timber
Spur stone
Hold fast
Skilled Labour
unskilled Labour
Allow for cement and sand
Allow for dowel pins

0.043
2.000
4.000
9.000
9.000

Cu.m.
No.
No.
Hr.
hr.

@
@
@
@
@

Sub total
O.H. 14%
Total
Say per m.

I065 Supplying and fixing in position of 100mmx50mm spl.cl.up. timber door frames.
Per 4.572 m
Timber timber
Spur stone
Hold fast
Skilled Labour
unskilled Labour
Allow for cement and sand
Allow for dowel pins

0.028
2.000
4.000
9.000
9.000

Cu.m.
No.
No.
Hr.
hr.

@
@
@
@
@

68,572.00
61.00
50.00
125.00
81.25

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 96 of 263

1,920.02
122.00
200.00
1,125.00
731.25
100.00
25.00

Sub total
O.H. 14%
Total

4,223.27
591.26
4,814.52
1,053.05
1,053.00

Say per m.
I066 Supplying and fixing in position 100mmx75mm window frame in spl.cl.up. timber.
Per 7.925 m
Timber timber
Hold fast
Skilled Labour
unskilled Labour
Allow for cement and sand

0.071
2.000
13.000
13.000

Cu.m.
No.
Hr.
hr.

@
@
@
@

69,704.00
50.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

4,948.98
100.00
1,625.00
1,056.25
50.00
7,780.23
1,089.23
8,869.47
1,119.18
1,119.00

I067 Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood door hung on 100mm
x75mm frame in sp.cl.up. timber complete with iron furniture and motice lock union English
Per 2.114 Sq.m.

Timber
Spur stones
Holdfasts
Skilled Labour
Unskilled Labour
Plywood door ordinary M.R.
886x2060x32mm
Hinge butt iron 100mm
Bolt skeleton iron 200mm
Bolt barrel iron 150mm
Screws iron 40mmxgauge8
Screws iron 25mmxgauge8
Screws iron 20mmxgauge8
Mortice lock
Allow for dowels

0.045
2.000
6.000
13.000
13.000
1.000
3.000
1.000
1.000
1.000
2.000
1.000
1.000

Cu.m.
No.
Nos.
Hour
Hour

@
@
@
@
@

69,704.00
61.00
50.00
125.00
81.25

3,136.68
122.00
300.00
1,625.00
1,056.25

No.
No.
No.
No.
Doz.
Doz.
Doz.
No.

@
@
@
@
@
@
@
@

4,515.00
150.00
150.00
133.00
19.20
16.20
15.00
3,000.00

4,515.00
450.00
150.00
133.00
19.20
32.40
15.00
3,000.00
25.00
14,579.53
2,041.13
16,620.66
7,862.19
7,860.00

Sub total
O.H. 14%
Total
Say per Sq. m.

I068 Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood door hung on 100mm
x75mm frame in sp.cl.up. timber complete with iron furniture and motice lock union Chinise
Per 2.114 Sq.m.

As per Item No. 66


Less lock
Add lock Chinise

1.000 No.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 97 of 263

575.00

14,579.53
3,000.00
575.00

Sub total
O.H. 14%
Total
Say per Sq. m.

12,154.53
1,701.63
13,856.16
6,554.48
6,550.00

I069 Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood door on existing frame with
fittings and mortice lock English.
Per 1.725 Sq.m.
Skilled Labour
Unskilled Labour
Plywood door ordinary M.R.
Hinge butt iron 100mm
Bolt skeleton iron 300mm
Bolt barrel iron 150mm
Screws iron 40mmxgauge8
Screws iron 25mmxgauge8
Screws iron 20mmxgauge8
Mortice lock

4.000
4.000
1.000
3.000
1.000
1.000
1.000
2.000
1.000
1.000

Hour
Hour
No.
No.
No.
No.
Doz.
Doz.
Doz.
No.

@
@
@
@
@
@
@
@
@
@

125.00
81.25
4,515.00
150.00
150.00
133.00
19.20
16.20
15.00
3,000.00

Sub total
O.H. 14%
Total
Say per Sq. m.

500.00
325.00
4,515.00
450.00
150.00
133.00
19.20
32.40
15.00
3,000.00
9,139.60
1,279.54
10,419.14
6,040.08
6,040.00

I070 Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood door on existing frame with
fittings and mortice lock Chinise.
Per 1.725 Sq.m.
As per Item No. 68
Less lock
Add lock Chinise

1.000 No.
Sub total
O.H. 14%
Total

575.00

Say per Sq. m.

9,139.60
3,000.00
575.00
6,714.60
940.04
7,654.64
4,437.47
4,430.00

I071 Supplying and fixing of 31mm thick marine type plywood door (ordinary water proof) on existing frame with
fittings and nightlatch lock.
Per 1.41 Sq.m.
Plywood door ordinary M.R.
Skilled Labour

1.000 No.
4.000 Hour

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 98 of 263

4,200.00
125.00

4,200.00
500.00

Unskilled Labour
Bolt barrel iron 150mm
Screws iron 20mmxgauge8
Night latch lock
Ring iron 45m to 38mm

4.000
2.000
1.000
1.000
1.000

Hour
No.
Doz.
No.
No.

@
@
@
@
@

81.25
133.00
16.20
960.00
64.00

Sub total
O.H. 14%
Total
Say per Sq. m.

325.00
266.00
16.20
960.00
64.00
6,331.20
886.37
7,217.57
5,118.84
5,110.00

I072 Supplying and fixing 2100 to 3000mm high, 4.7mm thick glazed partition with 12mm thick chipboard panels
on both sides & 100x75mm & 100mmx100mm uptights at 900mm intervals & 100x50mm as horizontal
members in sp.cl.up timber with 50 x 12mm timber beading around the glass pane.
Per 6.341 Sq.m
12mm chip board
Timber
Glass pane clear 5mm.
50mm x12mm timber beading
Skilled Labour
Unskilled Labour
Wire nail S.W.G 20 to22
Screws iron 25mm xgauge 8
Allow for cement and sand, etc.
Allow for staples

5.978
0.109
3.499
14.082
5.000
3.500
0.907
3.000

Sq.m.
Cu.m.
Sq.m.
m.
day
day
Kg.
Doz.

@
@
@
@
@
@
@
@

660.00
69,704.00
693.00
57.75
1,000.00
81.25
185.00
16.20

Sub total
O.H. 14%
Total
Say per Sq. m.

3,945.48
7,597.74
2,424.81
813.24
5,000.00
284.38
167.80
48.60
100.00
100.00
20,482.03
2,867.48
23,349.51
3,682.31
3,680.00

I073 Sorting out of available timber cut to required sizes and fixed in partitions and frames.
Per 0.023 Cu.m.(100 x 75 - 3.048m)
Skilled Labour
Unskilled Labour
Allow for screws, sand paper etc.

5.000 hour
1.000 Hour

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say per Cu. m.

I074 Doors flushed / panelled 4x3 frame and 1" thick sashes in sp.cl.up. timber including 9" height trellis
work on top and complete with Iron Oxi. Fittings and locking arrangement.

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 99 of 263

625.00
81.25
50.00
756.25
105.88
862.13
37,483.70
37,480.00

Per Door : 4' x 7'-6" (30 Sq.ft) Single hung


1.65
26
15
5
1
1
1
42
18
2
9
9

Timber
1" Thick Planks
9" Trellis
5" x 5" But hinges
10" Skelton bolt
Mortise lock with 2 liver
5 " Barrel Bolt
1 " x 10 Iron screws
5/8 " 4 x 4 screws
Hold fast
Skilled Labour
Unskilled Labour
Allow for sand paper

Cu.ft
Sq.ft
Nos.
Nos.
No.
No.
No.
Nos.
Nos.
Nos.
Day
Day

1,815.00
158.00
75.00
165.00
100.00
3,300.00
100.00
1.25
0.75
50.00
850.00
600.00

Sub total
O.H. 14%
Total
Say per Sq.ft
Say per Sq.m

2,994.75
4,108.00
1,125.00
825.00
100.00
3,300.00
100.00
52.50
13.50
100.00
7,650.00
5,400.00
25.00
25,793.75
3,611.13
29,404.88
980.16
10,536.00

I075 Fanlight Glazed supplied and fixing 28mm thick sash and 100 x 75mm frames in sp.cl.up. timber
with Iron Oxi. Fittings
2' - 6" x 1'-3" - (3.125 Sq.ft)
2.59
0.232
0.139
2.43

100 x 75 Timber
25mm thick planks
Obscured glass 3mm thick
12 x 12mm fillet
Add 5% wastage
1 Centre pivot hinges
1 3 " Barrel Bolt
1 Fanlight catch
12 5/8 " x 6 screws
Making & Fixing Frame
1.25 Skilled Labour
2 Skilled Labour
2 Unskilled Labour
1.25 Unskilled Labour
Allow for sand paper

L.m
Sq.m
Sq.m
L.m

418.00
1,554.00
750.00
5.00

No.
No.
No.
Nos.

60.00
55.00
80.00
0.75

Day
hrs.
hrs.
Day

850.00
106.25
75.00
600.00

Sub total
O.H. 14%
Total
Per Sq.m
Say

I076

1,082.62
360.53
104.25
12.15
5.21
60.00
55.00
80.00
9.00
1,062.50
212.50
150.00
750.00
25.00
3,968.76
555.63
4,524.39
15,601.33
15,600.00

Glazed window with 4 x 3 frame and 1" thick 3 1/2 wide casement in sp.up.cl. Timber and provide 1/2" x 1/4"
flat iron grill work in cluding 9" height louvers work on top and complete with Iron Oxi. Fittings and locking
arrangement.
275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 100 of 263

Glazed window with 4 x 3 frame and 1" thick 3 1/2 wide casement in sp.up.cl. Timber and provide 1/2" x 1/4"
flat iron grill work in cluding 9" height louvers work on top and complete with Iron Oxi. Fittings and locking
arrangement.
Per Window : 4' - 3" x 5' - 6" (2.875 Sq.ft) Three hung
2.8
13.5
16.5
18
6
6
3
6
48
66
3
2
8
6

Timber
1" Thick Planks
Obscured glass pane 3mm
9" Louvers
4" x 4" But hinges
4 " Barrel Bolt
Casement 10"
Draw rings
3/4 " x 10 Iron screws
5/8 " 4 screws
1'-4 1/2" x 5' - 3" Grill
Hold fast
Skilled Labour
Unskilled Labour
Allow for sand paper

Cu.ft
Sq.ft
Sq.ft
Nos.
Nos.
No.
No.
No
Nos.
Nos.
No
Nos.
Day
Day

1,815.00
158.00
75.00
75.00
90.00
75.00
95.00
40.00
1.00
0.75
50.00
850.00
600.00

Sub total
O.H. 14%
Total
Say per Sq.ft
Say per Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - I - Page No: 101 of 263

5,082.00
2,133.00
1,237.50
1,350.00
540.00
450.00
285.00
240.00
48.00
49.50
0.00
100.00
6,800.00
3,600.00
25.00

J - IRON MONGER
J001 Bolts barrel, Iron Oxi. 100mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.
0.500 Doz.
0.330 hour

100mm barrel bolt


25mm screws
Carpenter

@
@
@

116.00
16.20
125.00

116.00
8.10
41.25
165.35
23.15
188.50
188.00

133.00

133.00
49.35
182.35
25.53
207.88
207.00

Sub total
O.H. 14%
Total
Say per No.
J002 Bolts barrel, Iron Oxi. 150mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.

150mm barrel bolt


Screws & Labour as in Item 1

@
Sub total
O.H. 14%
Total
Say per No.

J003 Casement fastners, Iron Oxi. with mortice plate polished heavy quality supplied & fixed with Iron Screws.
Per No.
1.000 No.
0.330 Doz.
0.750 hour

Casement fastners.
25mm Screws
Carpenter

@
@
@

84.00
16.20
125.00

84.00
5.35
93.75
183.10
25.63
208.73
208.00

176.00
16.20
125.00

176.00
5.35
62.50

Sub total
O.H. 14%
Total
Say per No.
J004 Casement stays, Iron Oxi. 250mm heavy quality supplied & fixed
Per No.
1.000 No.
0.330 Doz.
0.500 hour

250mm casement stays


25mm Screws
Carpenter

@
@
@
Sub total
O.H. 14%
Total

243.85
34.14
277.98
277.00

Say per No.


J005 Casement stays, Iron Oxi. 300mm heavy quality supplied & fixed
Per No.
1.000 No.

300mm casement stays


Screws & Labour as in Item 4

@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 102 of 263

200.00

200.00
67.85
267.85
37.50
305.34
305.00

J006 Fanlight catches Iron Oxi. heavy quality, with Iron screws fixed complete.
Per No.
1.000 No.
0.330 Doz.
0.750 hour

Fanlight catch
25mm screws
Carpenter

@
@
@

175.00
16.20
125.00

Sub total
O.H. 14%
Total
Say per No.

175.00
5.35
93.75
274.10
38.37
312.47
312.00

J007 Hasp & staple, safty type 150mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per No.
1.000 No.
0.750 Doz.
0.500 hour

150mm Hasp & staple.


25mm screws
Carpenter

@
@
@

179.00
16.20
125.00

Sub total
O.H. 14%
Total
Say per No.

179.00
12.15
62.50
253.65
35.51
289.16
289.00

J008 Hasp & staple, safty type 100mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per No.
1.000 No.

100mm Hasp & staple.


Screws & Labour as in Item 7

@
@

90.00

90.00
74.65
164.65
23.05
187.70
187.00

168.00
16.20
125.00
81.25

336.00
16.20
93.75
60.94
506.89
70.96
577.85
288.93
288.00

Sub total
O.H. 14%
Total
Say per No.

J009 Hinges, butt 100x50mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

Nos.
Doz.
hour
hour

100 x 50mm Hinges


25mm screws
Carpenter
Labour

@
@
@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 103 of 263

J010 Hinges, butt 100x75mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

Nos.
Doz.
hour
hour

100 x 50mm Hinges


25mm screws
Carpenter
Labour

@
@
@
@

168.00
16.20
125.00
81.25

336.00
16.20
93.75
60.94
506.89
70.96
577.85
288.93
288.00

300.00
19.20
125.00
81.25

600.00
19.20
93.75
60.94
773.89
108.34
882.23
441.12
441.00

379.50

759.00
173.89
932.89
130.60
1,063.49
531.75
531.75

484.50

969.00
173.89
1,142.89
160.00
1,302.89
651.45
651.45

Sub total
O.H. 14%
Total
Say per No.

J011 Hinges, butt 100x100mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

Nos.
Doz.
hour
hour

100mm Hinges
38mm screws
Carpenter
Labour

@
@
@
@
Sub total
O.H. 14%
Total
Say per No.

J012 Hinges, butt 125x125mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per 2 Nos.
2.000 Nos.

125mm Hinges
Screws & Labour as in Item 11

@
Sub total
O.H. 14%
Total
Say per No.

J013 Hinges, butt 150x150mm Iron oxi. , heavy quality aupplied & fixed with screws complete.
Per 2 Nos.
2.000 Nos.

150mm Hinges
Screws & Labour as in Item 11

@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 104 of 263

J014 Ring Iron oxi. 45mm to 38mm supplied & fixed to doors & windows with screws.
Per No.
1.000 No.
0.250 Doz.
0.250 hour

Ring
20mm Iron screws
Carpenter

@
@
@

100.00
15.00
125.00

100.00
3.75
31.25
135.00
18.90
153.90
153.00

12.03
125.00

12.03
31.25
25.00
68.28
9.56
77.84
77.00

14.44
125.00

14.44
31.25
25.00
70.69
9.90
80.58
80.00

16.84
125.00

16.84
41.25
25.00
83.09
11.63
94.72
94.00

20.46

20.46

Sub total
O.H. 14%
Total
Say per No.

J015 Supplying & fixing of 45mm x 6mm bolts & nuts with washers.
Per No.
1.000 No.
0.250 hour

Bolt & nut iron 45x6mm


Skilled labour
Allow for washers etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

J016 Supplying & fixing of 75mm x 10mm Iron bolts & nuts with washers.
Per No.
1.000 No.
0.250 hours

Bolt & nut iron 75x10mm


Skilled labour
Allow for washers etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

J017 Supplying & fixing of 150mm x 10mm Iron bolts & nuts with washers.
Per No.
1.000 No.
0.330 Hour

Bolt & nut iron 150 x10mm


Skilled labour
Allow for washers etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

J018 Supplying & fixing of 225mm x 10mm Iron bolts & nuts with washers.
Per No.
1.000 No.

Bolt & nut iron 225 x10mm

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 105 of 263

0.500 Hour

Skilled labour
Allow for washers etc.

125.00

62.50
25.00
107.96
15.11
123.07
123.00

36.46
125.00

36.46
41.25
25.00
102.71
14.38
117.09
117.00

Sub total
O.H. 14%
Total
Say per No.

J019 Supplying & fixing of 225mm x 16mm Iron bolts & nuts with washers.
Per No.
1.000 No.
0.330 Hour

Bolt & nut iron 225 x16mm


Skilled labour
Allow for washers etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

J020 Supplying of 50x50mm G.I. Weldmesh (Guage 10) & fixing to existing frame with staples (Fillets & beading
paid separately)
Per 1.115 Sqm.
1.301 Sq.m
2.000 Hour
2.000 Hour

Weldmesh (Galvanised) 50x50mm guage 10


Skilled labour
unskilled labour
Allow for staples etc.
Sub total
O.H. 14%
Total

@
@
@

483.00
125.00
81.25

Say per Sq.m

628.38
250.00
162.50
25.00
1,065.88
149.22
1,215.11
1,089.78
1,089.00

J021 Supplying of 50x50mm G.I. Weldmesh (Guage 10) & fixing to window frames with 50x12mm Sp.Cl.Up.
Timber beading including painting mesh with red lead & 2 coats of enamel paint, beading with 2 coats of
enamel.
Per 1.115 Sqm.
1.301
6.096
5.000
2.000
3.000
1.500

Sq.m
m
Hour
Hour
Hour
Doz.

Weldmesh (Galvanised) 50x50mm guage 10


50x12mm timber beading
Skilled labour
unskilled labour
Painter
40mm screws
Allow for staples etc.
Sub total
O.H. 14%
Total

@
@
@
@
@
@

483.00
35.00
125.00
81.25
125.00
19.20

Say per Sq.m

J022 Supplying & fixing of 150mm Iron cabin hooks and eyes.
275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 106 of 263

628.38
213.36
625.00
162.50
375.00
28.80
25.00
2,058.04
288.13
2,346.17
2,104.19
2,104.00

Per No.
1.000 No.
0.330 Hour

Cabin hook & eye Iron 150mm


Skilled labour

@
@

40.00
125.00

40.00
41.25
81.25
11.38
92.63
92.00

26.25
125.00

26.25
41.25
67.50
9.45
76.95
76.00

Sub total
O.H. 14%
Total
Say per No.

J023 Supplying & fixing of 200mm Iron cabin hooks and eyes.
Per No.
1.000 No.
0.330 Hour

Cabin hook & eye Iron 200mm


Skilled labour

@
@
Sub total
O.H. 14%
Total
Say per No.

J024
Making iron gate with 40x40x6mm angle iron frame work including bracing & horizontal centre member with
16mm M.S. bar at 150mm crs. & fixing in position complete with starp hinges, hasp & staples.
Per 1.858 Sq.m.
6.000
9.070
21.330
6.000
2.500

m
kg
kg
day
day

Angle iron 40x40x6mm


Mile steel flat
Mile steel
Black smith
unskilled labour
Allow for coal etc.

@
@
@
@
@

2,600.00
73.00
111.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m

15,600.00
662.11
2,367.63
6,000.00
1,625.00
100.00
26,354.74
3,689.66
30,044.40
16,170.29
16,170.00

J025 Tree hinges, 250mm iron oxi. heavy quality suplied & fixed with screws complete.
Per 2 Nos.
2.000
1.500
1.250
1.250

No.
Doz.
Hour
Hour

250mm Tee hinges


38mm Screws
Carpenter
Labourer

@
@
@
@
Sub total
O.H. 14%
Total
Say per No.

J026 Tree hinges, 300mm iron oxi. heavy quality suplied & fixed with screws complete.
Per 2 Nos.
275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 107 of 263

214.00
19.20
125.00
81.25

428.00
28.80
156.25
101.56
714.61
100.05
814.66
407.33
407.00

2.000
1.500
1.250
1.250

No.
Doz.
Hour
Hour

300mm Tee hinges


38mm Screws
Carpenter
Labourer

@
@
@
@

241.00
19.20
125.00
81.25

Sub total
O.H. 14%
Total
Say per No.

482.00
28.80
156.25
101.56
768.61
107.61
876.22
438.11
438.00

J027
Mild steel rods in reinforcing lintols or beams, bent to shape, laid in position and tied with G.I. wire as directed
Per 50.79 kg.
50.794 kg.
1.000 Day
1.000 Day
0.454 kg.

Mile steel rods


Allow for wastage 10%
Black smith
Labourer
lb 14 BWG wire

111.00

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.

5,638.13
563.81
1,000.00
650.00
86.26
7,938.21
1,111.35
9,049.56
178.18
178.00

J028
Mild steel rods in reinforcing in foundation bent to shape, laid in position and tied with G.I. wire as directed
Per 50.79 kg.
50.794 kg.
0.750 Day
0.750 Day
0.454 kg.

Mile steel rods


Allow for wastage 10%
Black smith
Labourer
lb 14 BWG wire

111.00

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.

5,638.13
563.81
750.00
487.50
86.26
7,525.71
1,053.60
8,579.31
168.92
168.00

J029 Mild steel rods in reinforcing lintols or beams, bent to shape, laid in position and tied with G.I. wire as directed.
MS rods available.
Per 50.79 kg.
1.000 Day
1.000 Day
0.454 kg.

Black smith
Labourer
lb 14 BWG wire

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.
275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 108 of 263

1,000.00
650.00
86.26
1,736.26
243.08
1,979.34
38.97
38.00

J030 Mild steel rods in reinforcing in foundation bent to shape, laid in position and tied with G.I. wire as directed.
MS rods available.
Per 50.79 kg.
0.750 Day
0.750 Day
0.454 kg.

Black smith
Labourer
lb 14 BWG wire

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.

750.00
487.50
86.26
1,323.76
185.33
1,509.09
29.71
29.00

J031
Tor steel rods in reinforcing lintols or beams, bent to shape, laid in position and tied with G.I. wire as directed
Per 50.79 kg.
50.794 kg.
1.000 Day
1.000 Day
0.454 kg.

Steel rods
Allow for wastage 10%
Black smith
Labourer
lb 14 BWG wire

100.00

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.

5,079.40
507.94
1,000.00
650.00
86.26
7,323.60
1,025.30
8,348.90
164.38
164.00

J032
Tor steel rods in reinforcing in foundation bent to shape, laid in position and tied with G.I. wire as directed
Per 50.79 kg.
50.794 kg.
0.750 Day
0.750 Day
0.454 kg.

Steel rods
Allow for wastage 10%
Black smith
Labourer
lb 14 BWG wire

100.00

@
@
@

1,000.00
650.00
190.00

Sub total
O.H. 14%
Total
Say per kg.

5,079.40
507.94
750.00
487.50
86.26
6,911.10
967.55
7,878.65
155.12
155.00

J033 M.S. Bars 16mm dia. supplied and fixed in window frames at 100 centres and painted with one coat of
aluminium or anticorrosive paint and 2 coats of oil paint.
Per 5.182 L.m
8.635 kg.

Steel rods
Allow for wastage 10%

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 109 of 263

111.00

958.49
95.85

1.000 Hour
1.000 Hour
1.000 Hour

Painter
Carpenter
Labourer
Allow for paint

@
@
@

125.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per L.m.

125.00
125.00
81.25
100.00
1,485.58
207.98
1,693.57
326.82
326.00

J034 M.S. Bars 20mm dia. supplied and fixed in window frames at 100 centres and painted with one coat of
aluminium or anticorrosive paint and 2 coats of oil paint.
Per 5.182 L.m
12.698 kg.
1.000 Hour
1.000 Hour
1.000 Hour

Steel rods
Allow for wastage 10%
Painter
Carpenter
Labourer
Allow for paint

111.00

@
@
@

125.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per L.m.

275544406.xls - DEPARTMENT OF BUILDINGS - J - Page No: 110 of 263

1,409.48
140.95
125.00
125.00
81.25
150.00
2,031.68
284.43
2,316.11
446.95
446.00

K - BRASS FOUNDER
K001 Bolts casement fastners or stays, removed & fixied including making good to holes in frames & sashes.
Per No.
0.500 hour

Carpenter

125.00

62.50
62.50
8.75
71.25
71.00

132.30
16.20
125.00

132.30
8.10
41.25
181.65
25.43
207.08
207.00

137.81

137.81
49.35
187.16
26.20
213.37
213.00

248.00

248.00
49.35
297.35

Sub total
O.H. 14%
Total
Say per No.
K002 Bolts barrel, Brass 62mm" heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.
0.500 Doz.
0.33 hour

62mm Brass brrel bolt


25mm screws
Carpenter

@
@
@
Sub total
O.H. 14%
Total
Say per No.

K003 Bolts barrel, polished 75mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.

75mm Brass brrel bolt


Screws & Labour as in Item 2

@
Sub total
O.H. 14%
Total
Say per No.

K004 Brass barrel bolts, polished 100mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.

100mm Brass brrel bolt


Screws & Labour as in Item 2

@
Sub total
O.H. 14%
Total

41.63
338.98
338.00

Say per No.


K005 Brass barrel bolts, polished 125mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.

125mm Brass brrel bolt


Screws & Labour as in Item 2

@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 111 of 263

260.00

260.00
49.35
309.35
43.31
352.66
352.00

K006 Brass barrel bolts, polished 150mm heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.

125mm Brass brrel bolt


Screws & Labour as in Item 2

260.00

Sub total
O.H. 14%
Total
Say per No.

260.00
49.35
309.35
43.31
352.66
352.00

K007 Casement fastners, brass with mortice plate polished heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.
0.330 Doz.
0.75 hour

Casement fastners. (Steel)


25mm screws
Carpenter

@
@
@

84.00
16.20
125.00

84.00
5.35
93.75
183.10
25.63
208.73
208.00

176.00
16.20
125.00

176.00
5.35
62.50
243.85
34.14
277.98
277.00

200.00
16.20
125.00

200.00
5.35
62.50
267.85
37.50
305.34
305.00

175.00
16.20
125.00

175.00
5.35
93.75

Sub total
O.H. 14%
Total
Say per No.
K008 Casement satys, polished 250mm heavy quality supplied & fixed.
Per No.
1.000 No.
0.330 Doz.
0.50 hour

250mm Casement stays. (Steel)


25mm screws
Carpenter

@
@
@
Sub total
O.H. 14%
Total
Say per No.

K009 Casement satys, polished 300mm heavy quality supplied & fixed.
Per No.
1.000 No.
0.330 Doz.
0.50 hour

300mm Casement stays. (Steel)


25mm screws
Carpenter

@
@
@
Sub total
O.H. 14%
Total
Say per No.

K010 Fanlight catches brass heavy quality, with brass screws fixed complete.
Per No.
1.000 No.
0.330 Doz.
0.75 hour

Fanlight catch (Steel)


25mm screws
Carpenter

@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 112 of 263

Sub total
O.H. 14%
Total

274.10
38.37
312.47
312.00

Say per No.


K011 Brass Door Handles polished, heavy quality supplied & fixed with brass screws.
Per No.
1.000 No.
0.330 Doz.
0.25 hour

Door handle
25mm screws
Carpenter

@
@
@

450.00
16.20
125.00

Sub total
O.H. 14%
Total
Say per No.

450.00
5.35
31.25
486.60
68.12
554.72
554.00

K012 Hasp & staple, safty type 150mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per No.
1.000 No.
0.750 Doz.
0.50 hour

150mm Hasp and staple (steel)


25mm screws
Carpenter

@
@
@

179.00
16.20
125.00

Sub total
O.H. 14%
Total
Say per No.

179.00
12.15
62.50
253.65
35.51
289.16
289.00

K013 Hasp & staple, safty type 100mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per No.
1.000 No.

100mm Hasp and staple


Screws & Labourer as per item 12

90.00

Sub total
O.H. 14%
Total
Say per No.

90.00
74.65
164.65
23.05
187.70
187.00

K014 Butt hinges 50mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

No.
Doz.
hour
hour

50mm Hinges
20mm Screws.
Carpenter
Labour

@
@
@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 113 of 263

75.50
16.20
125.00
81.25

151.00
16.20
93.75
60.94
321.89
45.06
366.95
183.48

Say per No.

183.00

K015 Butt hinges 75mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

No.
Doz.
hour
hour

75mm Hinges
20mm Screws.
Carpenter
Labour

@
@
@
@

115.50
16.20
125.00
125.00

Sub total
O.H. 14%
Total
Say per No.

231.00
16.20
93.75
93.75
434.70
60.86
495.56
247.78
247.00

K016 Butt hinges 87.50mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000
1.000
0.750
0.750

No.
Doz.
hour
hour

87mm Hinges
38mm Screws.
Carpenter
Labour

@
@
@
@

220.50
132.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per No.

441.00
132.00
93.75
60.94
727.69
101.88
829.56
414.78
414.00

K017 Butt hinges 100mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000 No.

100mm Hinges
Screws & Labourer as item 16

269.00

Sub total
O.H. 14%
Total
Say per No.

538.00
286.69
824.69
115.46
940.14
470.07
470.00

K018 Butt hinges 125mm brass polished, heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000 No.

125mm Hinges
Screws & Labourer as item 16

@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 114 of 263

379.50

759.00
286.69
1,045.69
146.40

Total

1,192.08
596.04
596.00

Say per No.

K019 Hinges centre pivot (closing of 2 pieces) brass polished, heavy quality supplied & fixed with brass screws
complete.
Per 2 Nos.
2.000
0.750
1.000
1.000

No.
Doz.
hour
hour

75mm Center pivots


25mm Screws.
Carpenter
Labour

@
@
@
@

110.00
16.20
125.00
81.25

220.00
12.15
125.00
81.25
438.40
61.38
499.78
249.89
249.00

840.00
132.00
125.00
81.25

840.00
99.00
125.00
81.25
1,145.25
160.34
1,305.59
652.79
652.00

Sub total
O.H. 14%
Total
Say per No.

K020 Gravity Hinges brass supplied & fixed with brass screws complete.
Per 2 Nos.
1.000
0.750
1.000
1.000

No.
Doz.
hour
hour

Gravity hinges set


38mm Screws.
Carpenter
Labour

@
@
@
@
Sub total
O.H. 14%
Total
Say per No.

K021 Hinges parliamentary 100mm brass polished heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000
0.750
1.000
1.000

No.
Doz.
hour
hour

100mm hinges set


38mm Screws.
Carpenter
Labour

@
@
@
@
Sub total
O.H. 14%
Total
Say per No.

K022 Hinges parliamentary 125mm brass polished heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 115 of 263

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.000 No.

125mm hinges set


Labourer & Screws as in Item 21

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sub total
O.H. 14%
Total
Say per No.

K023 Hinges parliamentary 150mm brass polished heavy quality supplied & fixed with brass screws complete.
Per 2 Nos.
2.000 No.

150mm hinges
Labourer & Screws as in Item 21

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sub total
O.H. 14%
Total
Say per No.
K024 Hinges supplied by Department fixed complete with brass screws.
Per 2 Nos.
1.500 Doz.
0.750 hour
0.750 hour

38mm Screws.
Carpenter
Labour

@
@
@

132.00
125.00
81.25

198.00
93.75
60.94
352.69
49.38
402.06
201.03
201.00

450.00
125.00

450.00
31.25
20.00
501.25
70.18
571.43
285.71
285.00

16.20
125.00

8.10
187.50
195.60
27.38
222.98
222.00

Sub total
O.H. 14%
Total
Say per No.
K025 Knobs for door locks, polished brass heavy quality renewed wirh brass screws.
Per 2 Nos.
1.000 set
0.250 hour

Door knobs per set


Carpenter
Allow for screws

@
@
Sub total
O.H. 14%
Total
Say per No.

K026 Locks, door available fixed with screws.


Per No.
0.500 Doz.
1.500 hour

25mm Iron screws


Carpenter

@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 116 of 263

K027 Locks, door repaired and re - fixed


Per No.
2.000 hour
Lock smith
Allow for repalcement of springs, secrews etc.
1.000 hour
Carpenter removing & refixing
Sub total
O.H. 14%
Total

125.00

125.00

Say per No.

K028 Locks, cupboard 62mm brass 4 levers with brass screws fixed complete.
Per 1 No.
1.000 No.
62mm cupboard lock
0.330 Doz.
20mm Screws.
1.000 hour
Carpenter
Sub total
O.H. 14%
Total

@
@
@

250.00
100.00
125.00
475.00
66.50
541.50
541.00

105.00
84.00
125.00

105.00
27.72
125.00
257.72
36.08
293.80
293.00

125.00
125.00

125.00
125.00
50.00
300.00
42.00
342.00
342.00

960.00
96.00
125.00

960.00
48.00
25.00
1,033.00
144.62
1,177.62
1,177.00

575.00
1,000.00

575.00
500.00
1,075.00
150.50
1,225.50
1,225.00

Say per No.

K029 Locks, cupboard repaired and re-fixed


Per No.
1.000 hour
1.000 hour

Carpenter removing & re-fixing


Lock smith
Allow for replacement, screws etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

K030 Locks, bird night latch supplied and fixed with complete keys.
Per No.
1.000 No.
0.500 Doz.
0.200 hour

Bird night latch


25mm brass screws.
Carpenter

@
@
@
Sub total
O.H. 14%
Total
Say per No.

K031 Locks mortice (Local) single lever supplied & fixed


Per No.
1.000 No.
0.500 Day

Mortice lock (single lever)


Carpenter

@
@
Sub total
O.H. 14%
Total

Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 117 of 263

K032 Locks mortice (Local) double lever supplied & fixed


Per No.
1.000 No.
1.000 Day

Mortice lock
Carpenter

@
@

2,300.00
1,000.00

Sub total
O.H. 14%
Total
Say per No.

2,300.00
1,000.00
3,300.00
462.00
3,762.00
3,762.00

K033 Locks mortice Union (English) single lever supplied & fixed
Per No.
1.000 No.
0.500 Day

Mortice lock Union(single lever)


Carpenter

@
@

3,000.00
1,000.00

Sub total
O.H. 14%
Total
Say per No.

3,000.00
500.00
3,500.00
490.00
3,990.00
3,990.00

K034 Locks mortice Union (English) double lever supplied & fixed
Per No.
1.000 No.
1.000 Day

Mortice lock Union (double lever)


Carpenter

@
@

3,400.00
1,000.00

Sub total
O.H. 14%
Total
Say per No.

3,400.00
1,000.00
4,400.00
616.00
5,016.00
5,016.00

K035 Ring brass 45mm to 38mm supplied and fixed to doors and windows with brass screws.
Per No.
1.000 No.
0.250 Doz.
0.250 hour

Ring (Steel)
Brass screws
Carpenter

@
@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - K - Page No: 118 of 263

100.00
96.00
125.00

100.00
24.00
31.25
155.25
21.74
176.99
176.00

L - PLASTERER
L001 16mm thick 1:1:5 cement lime plastering & finished smooth - Ground floor.
Per 9.29 Sq.m.
0.800
0.198
1.000
6.000
12.000

50kg
Cu.m
bush.
hour
hour

Cement
Sand
Slaked lime
Mason
Unskilled labour
Allow for water

@
@
@
@
@

749.00
2,000.00
395.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m

599.20
396.00
395.00
750.00
975.00
75.00
3,190.20
446.63
3,636.83
391.48
391.00

L002 16mm thick 1:1:5 cement lime plastering & finished smooth - First floor.
Per 9.29 Sq.m.

1.000 hour

As per Item No:1


Unskilled labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

3,190.20
81.25
150.00
3,421.45
479.00
3,900.45
419.86
419.00

L003 16mm thick 1:1:5 cement lime plastering & finished smooth - Second floor.
Per 9.29 Sq.m.

2.000 hour

As per Item No:1


Unskilled labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

3,190.20
162.50
150.00
3,502.70
490.38
3,993.08
429.83
429.00

L004 16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm wide & finished smooth Ground floor.
Per 60.96 L.m.
0.800 50kg.

Cement

749.00

599.20

0.198 Cu.m

Sand

2,000.00

396.00

1.000 bush.

Slaked lime

395.00

395.00

2.500 day

Mason

1,000.00

2,500.00

2.500 day

Unskilled Labour
Allow for water.

650.00

1,625.00
75.00
5,590.20
782.63
6,372.83

Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 119 of 263

104.54
104.00

Say per L.m.

L005 16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm wide & finished smooth First floor.
Per 60.96 L.m.

1.000 hour

As per in Item No: 4


Unskilled Labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per L.m.

5,590.20
81.25
150.00
5,821.45
815.00
6,636.45
108.87
108.00

L006 16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm wide & finished smooth Second floor.
Per 60.96 L.m.

2.000 hour

As per in Item No: 4


Unskilled Labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per L.m.

5,590.20
162.50
150.00
5,902.70
826.38
6,729.08
110.39
110.00

L007 15mm thick 2:5 lime plastering & finished smooth.


Per 9.29 Sq.m.
0.198
3.250
8.000
14.000

Cu.m.
bush.
hour
hour

Sand
Slaked Lime
Mason
Unskilled labour

@
@
@
@

2,000.00
395.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m

396.00
1,283.75
1,000.00
1,137.50
3,817.25
534.42
4,351.67
468.42
468.00

L008 16mm thick 1:3 cement plastering & finished smooth. - Ground floor.
Per 9.29 Sq.m.
1.400
0.170
6.000
12.000

50kg.
Cu.m.
hour
hour

Cement
Sand
Mason
Unskilled labour
Allow for water.

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 120 of 263

1,048.60
340.00
750.00
975.00
75.00
3,188.60
446.40
3,635.00

Say per Sq.m

391.28
391.00

L009 16mm thick 1:3 cement plastering & finished smooth. - First floor.
Per 9.29 Sq.m.

1.000 hour

As per Item No:8


Unskilled labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

3,188.60
81.25
100.00
3,369.85
471.78
3,841.63
413.52
413.00

L010 16mm thick 1:3 cement plastering & finished smooth. - Second floor.
Per 9.29 Sq.m.

2.000 hour

As per Item No:8


Unskilled labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per Sq.m

3,188.60
162.50
150.00
3,501.10
490.15
3,991.25
429.63
429.00

L011 16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide & finished smooth - Ground
floor.
Per 60.96 L.m.
1.400
0.198
2.500
5.000

50kg.
Cu.m
day
day

Cement
Sand
Mason
Unskilled Labour
Allow for water.

@
@
@
@

749.00
2,000.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per L.m.

1,048.60
396.00
2,500.00
3,250.00
75.00
7,269.60
1,017.74
8,287.34
135.95
135.00

L012 16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide & finished smooth - First floor.
Per 60.96 L.m.

1.000 hour

As per in Item No:11


Unskilled Labour
Allow for scaffolding

@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 121 of 263

81.25

7,269.60
81.25
150.00
7,500.85
1,050.12

Total

8,550.97
140.27
140.00

Say per L.m.

L013 16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide & finished smooth - Second
floor.
Per 60.96 L.m.

2.000 hour

As per in Item No:11


Unskilled Labour
Allow for scaffolding

81.25

Sub total
O.H. 14%
Total
Say per L.m.

7,269.60
162.50
100.00
7,532.10
1,054.49
8,586.59
140.86
140.00

L014 65mm x 65mm cove moulding build in existing walls in 1:2 cement mortar.
Per 30.48 m.
1.100
0.085
2.500
2.500

50kg.
Cu.m.
day
day

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per m.

823.90
170.00
2,500.00
1,625.00
5,118.90
716.65
5,835.55
191.45
191.00

L015 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after chipping.
Per 30.48 m.
0.040 50kg.
0.500 hour
1.000 hour

Cement
Mason
Unskilled labour
Allow for sand

@
@
@

749.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

29.96
62.50
81.25
75.00
248.71
34.82
283.53
9.30
9.00

L016 75 x 12mm dado moulding in walls in 1:1:4 cement mortar only for replacement to match existing to be extra
over rate for plastering.
Per 30.48 m.
0.250
0.035
0.250
3.000

50kg.
Cu.m
Bush.
day

Cement
Sand
Lime (Slaked)
Mason

@
@
@
@

749.00
2,000.00
395.00
1,000.00

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 122 of 263

187.25
70.00
98.75
3,000.00

Allow for lime

75.00
3,431.00
480.34
3,911.34
128.32
128.00

Sub total
O.H. 14%
Total
Say per m.

L017 100mm x 50mm dado moulding 100mm x 50mm in cement & sand 1:2 built in existing wall.
Per 3.048 m.
0.250
0.017
4.000
4.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

187.25
34.00
500.00
325.00
1,046.25
146.48
1,192.73
391.31
391.00

L018 Laying of flashing or plaster bands over tiles 100mm to 150mm wide on roof in 1:1:4 cement and lime mortar.
Per 6.096 m.
0.160
0.028
0.167
1.500
3.000

50kg.
Cu.m
bush.
hour
hour

Cement
Sand
Lime
Mason
Unskilled labour

@
@
@
@
@

749.00
2,000.00
395.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

119.84
56.00
65.97
187.50
243.75
673.06
94.23
767.28
125.87
125.00

L019 Letters embossed in plaster 20mm thick 150mm high in cement & sand 1:2 cement floated & painted.
Per No.
0.500 hour
0.250 hour
0.125 hour

Skilled labour
Unskilled labour
Painter
Allow for cement, paint, etc.

@
@
@
Sub total
O.H. 14%
Total
Say per m.

L020 1:2 cement plastering flush in surface cracks including & raking & joints.
Per 3.048 m.

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 123 of 263

125.00
81.25
125.00

62.50
20.31
15.63
150.00
248.44
34.78
283.22
46.46
46.00

0.500 hour
0.750 hour

Mason
Unskilled labour
Allow for cement & sand

@
@

125.00
81.25

62.50
60.94
100.00
223.44
31.28
254.72
83.57
83.00

749.00
2,000.00
1,000.00
650.00

749.00
170.00
3,000.00
1,950.00
5,869.00
821.66
6,690.66
720.20
720.00

Sub total
O.H. 14%
Total
Say per m.

L021 Pointing, truck, projected in cement 1:2 on brick masonry etc.


Per 9.29 Sq.m
1.000
0.085
3.000
3.000

50kg.
Cu.m
day
day

Cement
Sand
Mason
Unskilled labour

@
@
@
@
Sub total
O.H. 14%
Total

Say per Sq.m.

L022 12mm thick 1:2 cement rendering above 10 m2


Per 9.29 Sq.m
1.500
0.142
6.000
12.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

1,123.50
284.00
750.00
975.00
3,132.50
438.55
3,571.05
384.40
384.00

L023 12mm thick 1:2 cement rendering up to 10 m2


Per 9.29 Sq.m
1.500
0.142
7.500
15.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

L024 12mm thick 1:3 cement rendering above 10 m2


Per 9.29 Sq.m

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 124 of 263

1,123.50
284.00
937.50
1,218.75
3,563.75
498.93
4,062.68
437.32
437.00

1.070
0.142
6.000
12.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

801.43
284.00
750.00
975.00
2,810.43
393.46
3,203.89
344.88
344.00

L025 12mm thick 1:3 cement rendering up to 10 m2


Per 9.29 Sq.m
1.070
0.142
7.500
15.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

801.43
284.00
937.50
1,218.75
3,241.68
453.84
3,695.52
397.79
397.00

L026 20mm thick 1:2 cement rendering above 10 m2


Per 9.29 Sq.m
2.250
0.205
8.000
16.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

1,685.25
410.00
1,000.00
1,300.00
4,395.25
615.34
5,010.59
539.35
539.00

L027 20mm thick 1:2 cement rendering up to 10 m2


Per 9.29 Sq.m
2.250
0.205
10.000
20.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

L028 20mm thick 1:3 cement rendering above 10 m2


275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 125 of 263

1,685.25
410.00
1,250.00
1,625.00
4,970.25
695.84
5,666.09
609.91
609.00

Per 9.29 Sq.m


1.750
0.205
8.000
16.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

1,310.75
410.00
1,000.00
1,300.00
4,020.75
562.91
4,583.66
493.40
493.00

L029 20mm thick 1:3 cement rendering up to 10 m2


Per 9.29 Sq.m
1.750
0.205
10.000
20.000

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

1,310.75
410.00
1,250.00
1,625.00
4,595.75
643.41
5,239.16
563.96
563.00

L030 Colour cement floating coat in rendering using red cement (colouring) & finish smooth.
Per 9.29 Sq.m
0.700
8.400
1.000
4.000

kg.
kg.
hour
hour

Coloured cement
gray cement
Mason
Unskilled labour

@
@
@
@

450.00
14.98
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

315.00
125.83
125.00
325.00
890.83
124.72
1,015.55
109.32
109.00

L031 20mm thick 1:2 cement rendering with 5% pudlo cement


Per 9.29 Sq.m
2.250
0.205
5.442
8.000
16.000

50kg.
Cu.m
kg.
hour
hour

Cement
Sand
Pudlo cement
Mason
Unskilled labour

@
@
@
@
@

749.00
2,000.00
140.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.
275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 126 of 263

1,685.25
410.00
761.88
1,000.00
1,300.00
5,157.13
722.00
5,879.13
632.84
632.00

L032 Skirting in cement mortar 1:3 12mm x 150mm projected or flush with wall, including forming groove.
Per 3.048 m.
0.100
0.009
2.500
2.500

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

74.90
18.00
312.50
203.13
608.53
85.19
693.72
227.60
227.00

L033 Skirting in cement mortar 1:3 12mm x 150mm projected or flush with wall, including forming groove.
Per 3.048 m.
0.100
0.009
2.500
2.500

50kg.
Cu.m
hour
hour

Cement
Sand
Mason
Unskilled labour

@
@
@
@

749.00
2,000.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

74.90
18.00
312.50
203.13
608.53
85.19
693.72
227.60
227.00

L034 10mm thick plastering to RCC beam & slab soffit in cement & sand 1:3 including floating with lime putty.
Per 9.29 Sq.m
0.800
0.142
0.400
2.000
2.000

50kg.
Cu.m
bush.
day
day

Cement
Sand
Slaked Lime
Mason
Unskilled labour
Allow for water
Allow for scaffolding

@
@
@
@
@

749.00
2,000.00
395.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

599.20
284.00
158.00
2,000.00
1,300.00
100.00
150.00
4,591.20
642.77
5,233.97
563.40
563.00

L035 20mm thick 1:2 cement & sand DPC & finished smooth with 2 coats of hot tar blinded with coarse sand.
Per 9.29 Sq.m.
2.250 50kg.
0.312 Cu.m
4.546 Lit.

Cement
Sand
DPC Tar

@
@
@

749.00
2,000.00
47.25

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 127 of 263

1,685.25
624.00
214.80

10.000 hour
20.000 hour

Mason
Unskilled labour
Allow for firewood & water

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - L - Page No: 128 of 263

1,250.00
1,625.00
125.00
5,524.05
773.37
6,297.42
677.87
677.00

M - TINKER
M001 450mm wide G.I. Flashing G.I. 22 BWG fixed with 150mm turned up along and top edge tucked well in to wall
in cement lime mortar including removal of old flashing.
Per 4.267 m.
1.920
4.000
1.000
5.000

Sq.m
hour
hour
hour

G.I. 24 BWG plain sheet


Tinker
Mason
Unskilled Labour
Allow for cement, sand & lead etc.

@
@
@
@

729.00
125.00
125.00
81.25

1,399.68
500.00
125.00
406.25
125.00
2,555.93
357.83
2,913.76
682.86
682.00

125.00
125.00
81.25

375.00
125.00
325.00
125.00
950.00
133.00
1,083.00
253.81
253.00

81.25

162.50
162.50
22.75
185.25
12.16
12.00

81.25

243.75
243.75
34.13

Sub total
O.H. 14%
Total
Say per m.

M002 Re-fixing G.I. Flashing including making good to walls in cement and lime mortar.
Per 4.267 m.
3.000 hour
1.000 hour
4.000 hour

Tinker
Mason
Unskilled Labour
Allow for cement, sand & lead etc.

@
@
@
Sub total
O.H. 14%
Total
Say per m.

M003 Cleaning of Gutter, eaves and down pipes in single storied buildings
Per 15.24 m.
2.000 hour

unskilled Labour

@
Sub total
O.H. 14%
Total
Say per m.

M004 Cleaning of Gutter, eaves and down pipes in two storied buildings
Per 15.24 m.
3.000 hour

unskilled Labour

@
Sub total
O.H. 14%
Total
Say per m.

275544406.xls - DEPARTMENT OF BUILDINGS - M - Page No: 129 of 263

277.88
18.23
18.00

M005 Re - grating gutter eaves in single storied buildings.


Per 15.24 m.
1.000 hour
1.000 hour

Tinker
unskilled Labour

@
@

125.00
81.25

125.00
81.25
206.25
28.88
235.13
15.43
15.00

Sub total
O.H. 14%
Total
Say per Sq.m.
M006 Re - grating gutter eaves in two storied buildings.
Per 15.24 m.
1.500 hour
1.500 hour

Tinker
unskilled Labour

@
@

125.00
81.25

187.50
121.88
309.38
43.31
352.69
23.14
23.00

Sub total
O.H. 14%
Total
Say per Sq.m.
M007 Gutters, Parapet G.I. BWG 900mm wide renewed on existing boards, joints soldered & laid complete.
Per 6.706 L.m.
6.693
9.000
2.000
9.000

Sq.m
hour
hour
hour

G.I. 24 BWG plain sheet


Tinker
Skilled Labour
Unskilled Labour
Allow for lead, soldering, fluid cement etc.
Sub total
O.H. 14%
Total

@
@
@
@

729.00
125.00
125.00
81.25

Say per m.

4,879.20
1,125.00
250.00
731.25
150.00
7,135.45
998.96
8,134.41
1,213.00
1,213.00

M008 22 BWG 900mm wide valley gutter renewed on existing boards sheets tarred, joints soldered & cement lime
filleting complete.
Per 6.706 L.m.
6.693
1.515
0.160
0.167
0.028
1.875
0.250
1.500

Sq.m
Lit.
50 kg.
Cu.m.
Cu.m.
Day
Day
Day

G.I. 24 BWG plain sheet


Coal Tar
Cement
Slaked lime
Sand
Unskilled Labour
Skilled Labour
Tinker
Allow for Nails ,soldering & Materials etc.
Sub total
O.H. 14%
Total

@
@
@
@
@
@
@
@

729.00
47.25
749.00
395.00
2,000.00
650.00
1,000.00
1,000.00

275544406.xls - DEPARTMENT OF BUILDINGS - M - Page No: 130 of 263

4,879.20
71.58
119.84
65.97
56.00
1,218.75
250.00
1,500.00
150.00
8,311.34
1,163.59
9,474.92

Say per m.

1,412.90
1,412.00

M009 22 BWG 900mm wide valley gutter renewed on existing boards sheets tarred, joints soldered & cement lime
filleting complete (G.I. Sheet supplied by client)
Per 6.706 L.m.
As per Item No. 8
Less sheets
Sub total
O.H. 14%
Total
Say per m.

8,311.34
-4,879.20
3,432.14
480.50
3,912.64
583.45
583.00

M010 G.I. 900 mm overall 22 BWG prapet gutters renewed including timber 25mm boarding joints soldered & laid
complete.
Per 6.706 L.m.

7.362
0.454
2.273
1.500
1.000

Sq.m
kg.
Lit.
Day
Day

As per Item No. 7


Timber planks 25mm class II
Wire nails SWG 20 to 22
Wood preservative
Unskilled Labour
Skilled Labour

@
@
@
@
@

1,643.00
185.00
1,000.00
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per m.

7,135.45
12,095.77
83.99
2,273.00
975.00
1,000.00
23,563.20
3,298.85
26,862.05
4,005.67
4,005.00

M011 G.I. 900 mm overall 22 BWG parapet gutters renewed including timber 25mm thick boarding sheet tarred
joints soldered & cement lime filleting complete.
Per 6.706 L.m.

7.362
0.454
2.273
1.500
1.000

Sq.m
kg.
Lit.
Day
Day

As per Item No. 8


Timber planks 25mm class II
Wire nails SWG 20 to 22
Wood preservative
Unskilled Labour
Skilled Labour

@
@
@
@
@

1,643.00
185.00
1,000.00
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per m.

275544406.xls - DEPARTMENT OF BUILDINGS - M - Page No: 131 of 263

8,311.34
12,095.77
83.99
2,273.00
975.00
1,000.00
24,739.09
3,463.47
28,202.56
4,205.57
4,205.00

M012 Fixing of square 114mm PVC eaves gutters with PVC brackets & brass screws at 450mm intervals including
necessary moulded fitting.
Per 7.315 L.m
2.000
1.000
0.500
17.000
1.500
1.000
1.000
3.000
2.000
2.000

No.
No.
No.
No.
No.
No.
50g
Doz.
hour
hour

114mm PVC gutter


Gutter end cap
Mitre Joint
Gutter bracket
Gutter joinner
Running head PVC
Solvant cement
Screws brass 20mm guage 8
Plumber
Unskilled Labour
Allow for scaffolding

@
@
@
@
@
@
@
@
@
@

4,653.75
85.00
333.00
52.00
99.00
229.00
84.00
84.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per m.

9,307.50
85.00
166.50
884.00
148.50
229.00
84.00
252.00
250.00
162.50
150.00
11,719.00
1,640.66
13,359.66
1,826.34
1,826.00

M013 Fixing of 87mm dia PVC down pipes with wooden plug including all necessary moulded fittings.
Per 7.315
2.000
4.000
1.000
4.000
4.000
0.670
1.500
0.250
0.250
0.500

No.
No.
No.
No.
No.
Doz.
50g
Day
Day
Day

Down pipe PVC


Down pipe Elbow PVC
Down pipe Joinner PVC
Wood plugs
Down pipe Clip PVC
Screws brass 20mm guage 8
Solvant cement
Plumber
Skilled Labour
Unskilled Labour
Allow for scaffolding

@
@
@
@
@
@
@
@
@
@

3,084.25
146.00
102.00
15.00
24.00
84.00
84.00
1,000.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per m.

275544406.xls - DEPARTMENT OF BUILDINGS - M - Page No: 132 of 263

6,168.50
584.00
102.00
60.00
96.00
56.28
126.00
250.00
250.00
325.00
150.00
8,167.78
1,143.49
9,311.27
1,272.90
1,272.00

N - GLAZIER
N001 Glass panes fixed with special upper beading (Glass supplied by Dept.)
Per 6 panes 0.310 M2
6.096 L.m
1.500 hour

12 x 12mm beading
Glazier
Allow for putty, nails etc.

@
@

45.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

274.32
187.50
75.00
536.82
75.15
611.97
1,974.11
1,974.00

N002 Glass panes 3mm, clear supplied & fixed with special class beading
Per 6 panes 0.310 m2
6.096 L.m
0.310 Sq.m
1.500 hour

12 x 12mm beading
3mm Glass pans
Glazier
Allow for putty, nails etc.

@
@
@

45.00
1,028.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

274.32
318.68
187.50
75.00
855.50
119.77
975.27
3,146.03
3,146.00

N003 Glass panes 3mm figured supplied & fixied with sp.cl. Beading.
Per 6 panes 0.310 m2
6.096 L.m
0.310 Sq.m
1.500 hour

12 x 12mm beading
3mm Glass pans (figured)
Allow for putty, nails etc.
Glazier

@
@

45.00
968.00

125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

274.32
300.08
75.00
187.50
836.90
117.17
954.07
3,077.63
3,077.00

N004 Glass panes 3mm Tinted supplied & fixied with sp.cl. Beading.
Per 6 panes 0.310 m2
6.096 L.m
0.310 Sq.m

12 x 12mm beading
3mm Glass pans (Tinted)
Allow for putty, nails etc.

@
@

45.00
1,184.00

274.32
367.04
75.00

1.500 hour

Glazier

125.00

187.50
903.86
126.54
1,030.40

Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - N - Page No: 133 of 263

Say per Sq.m.

3,323.87
3,323.00

N005 Glass panes 5mm Tinted glass supplied & fixied with sp.up. Beading.
Per 5 panes 0.387 m2
0.427 Sq.m
0.524 L.m
3.048 L.m
1.000 Doz.
1.500 hour

5mm Tinted Glass


40 x 12mm beading
12 x 12mm beading
Allow for putty, nails etc.
25mm screws.
Glazier

@
@
@

855.75
57.75
45.00

@
@

16.20
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

365.41
30.26
137.16
75.00
16.20
187.50
811.53
113.61
925.14
2,390.54
2,390.00

N006 Glass panes 5mm plane glass supplied & fixied with sp.up. Beading.
Per 5 panes 0.387 m2
0.427 Sq.m
0.524 L.m
3.048 L.m
1.000 Doz.
1.500 hour

5mm Plane Glass


40 x 12mm beading
12 x 12mm beading
Allow for putty, nails etc.
25mm screws.
Glazier

@
@
@

693.00
57.75
45.00

@
@

16.20
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

295.91
30.26
137.16
75.00
16.20
187.50
742.03
103.88
845.92
2,185.83
2,185.00

N007 Painted removed from painted glass panes with caustic soda solution or other paint remover.
Per 5 panes 0.387 m2
0.130 kg
1.000 hour

Custic soda
Labourer

@
@

189.00
81.25

Sub total
O.H. 14%
Total
Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - N - Page No: 134 of 263

24.57
81.25
105.82
14.81
120.63
311.72
311.00

P - PAINTER & DECORATOR

P001 One coat of cement washing to walls of single storied buildings, patching and preparing surface.
Per 92.903 Sq.m.
0.375 50 kg.
1.000 Day.
1.000 Day.

Cement
Painter
Unskilled Labour
Allow for brushes etc.

@
@
@

749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

280.88
1,000.00
650.00
150.00
2,080.88
291.32
2,372.20
25.53
25.00

P002 Two coats of cement washing to walls of single storied buildings, patching and preparing surface.
Per 92.903 Sq.m.
0.625 50 kg.
1.750 Day.
1.750 Day.

Cement
Painter
Unskilled Labour
Allow for brushes etc.

@
@
@

749.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

468.13
1,750.00
1,137.50
150.00
3,505.63
490.79
3,996.41
43.02
43.00

P003 Lettering 25mm to 50mm painted in Tamil, English or Sinhala including painting ground.
Per 6 Letter
1.000 hour

Sign board painter


Allow for brushes paint etc.

125.00

125.00
50.00
175.00
24.50
199.50
33.25
33.00

125.00

125.00
50.00
175.00

Sub total
O.H. 14%
Total
Say per No.

P004 Lettering 50mm to 75mm painted in Tamil, English or Sinhala including painting ground.
Per 6 Letter
1.000 hour

Sign board painter


Allow for brushes paint etc.

@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 135 of 263

24.50
199.50
33.25
33.00

P005 Lettering 100mm to 125mm painted in Tamil, English or Sinhala including painting ground.
Per 6 Letter
1.000 hour

Sign board painter


Allow for brushes paint etc.

125.00

125.00
50.00
175.00
24.50
199.50
33.25
33.00

847.00
1,000.00

549.70
500.00
50.00
1,099.70
153.96
1,253.66
134.95
134.00

Sub total
O.H. 14%
Total
Say per No.

P006 Painting the matal surface with one coat of Dulux bright aluminium paint.
Per 9.29 Sq.m
0.649 Lit.
0.500 day.

Aluminium Paint
Painter
Allow for brushes paint etc.

@
@
Sub total
O.H. 14%
Total

Say per Sq.m.

P007 Painting one coat of Dulax gloss finish includig washing cearing and smoothing down with sand paper.
Per 9.29 Sq.m
0.649 Lit.
0.500 day.

Enamel
Painter
Allow for brushes, sand paper, washing soda etc.
Sub total
O.H. 14%
Total

@
@

768.00
1,000.00

Say per Sq.m.

498.43
500.00
75.00
1,073.43
150.28
1,223.71
131.72
131.00

P008 Painting two coats of Dulax gloss finish includig washing cearing and smoothing down with sand paper.
Per 9.29 Sq.m
1.515 Lit.
1.125 day.

Enamel
Painter
Allow for brushes, sand paper, washing soda etc.
Sub total
O.H. 14%
Total

@
@

768.00
1,000.00

Say per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 136 of 263

1,163.52
1,125.00
75.00
2,363.52
330.89
2,694.41
290.03
290.00

P009 Painting new wood work with Dulux wood Aluminium primer and 2 coats of Dulux Gloss finish.
Per 9.29 Sq.m
0.758 Lit.
1.515 Lit.
1.750 day.

Aluminium Primer
Oil paint (Gloss)
Painter
Allow for brushes, sand paper, etc.

@
@
@

723.00
768.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

548.03
1,163.52
1,750.00
75.00
3,536.55
495.12
4,031.67
433.98
433.00

P010 Painting new wood work with one coat of Dulux wood Aluminium primer.
Per 9.29 Sq.m
0.758 Lit.
0.625 day.

Aluminium Primer
Painter
Allow for brushes, sand paper, etc.

@
@

723.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

548.03
625.00
100.00
1,273.03
178.22
1,451.26
156.22
156.00

P011 Painting steel work 1 coat of Dulux Bituchem Anticorrosive paint including removing scale and wire brushing.
Per 9.29 Sq.m
0.758 Lit.
0.625 day.

Bituchem Anticorrosive paint


Painter
Allow for brushes, etc.

@
@

586.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

444.19
625.00
50.00
1,119.19
156.69
1,275.87
137.34
137.00

P012 Painting steel work 2 coats of Dulux Bituchem Anticorrosive paint including removing scale and wire brushing.
Per 9.29 Sq.m
1.515 Lit.
1.125 day.

Bituchem Anticorrosive paint


Painter
Allow for brushes, etc.

@
@

586.00
1,000.00

Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 137 of 263

887.79
1,125.00
50.00
2,062.79
288.79

Total
Say per Sq.m.

2,351.58
253.13
253.00

P013 Painting walls with Dulux Acrylic wall filler where necessary.
Per 9.29 Sq.m
0.909 Lit.
0.375 day.

Acrylic wall filler


Painter
Allow for brushes, etc.

@
@

416.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

378.14
375.00
50.00
803.14
112.44
915.58
98.56
98.00

P014 Paiting walls with 1 coat of Pentalite Plus Emulsion paint including preparing surface of new work.
Per 9.29 Sq.m
0.758 Lit.
0.375 day.

Emulsion
Painter
Allow for brushes, etc.

@
@

648.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

491.18
375.00
50.00
916.18
128.27
1,044.45
112.43
112.00

P015 Paiting walls with 2 coats of Pentalite Plus Emulsion paint including preparing surface of new work.
Per 9.29 Sq.m
1.407 Lit.
5.500 hour

Emulsion
Painter
Allow for brushes, etc.

@
@

648.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

911.74
687.50
75.00
1,674.24
234.39
1,908.63
205.45
205.00

P016 Paiting walls with 1 coat of Pentalite Plus Emulsion paint including preparing surface of old work.
Per 9.29 Sq.m
0.758 Lit.
3.500 hour

Emulsion
Painter
Allow for brushes, etc.

@
@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 138 of 263

648.00
125.00

491.18
437.50
50.00
978.68
137.02
1,115.70
120.10

Say per Sq.m.

120.00

P017 Paiting walls with 2 coats of Pentalite Plus Emulsion paint including preparing surface of old work.
Per 9.29 Sq.m
1.407 Lit.
6.000 hour

Emulsion
Painter
Allow for brushes, etc.

@
@

648.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

911.74
750.00
75.00
1,736.74
243.14
1,979.88
213.12
213.00

P018 Applyingof one coat of tar nap or other wood preservative to new wood work.
Per 9.29 Sq.m.
1.137 Lit.
0.250 Day

Wood preservative
Painter
Allow for brushes, etc.

@
@

1,000.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,137.00
250.00
50.00
1,437.00
201.18
1,638.18
176.34
176.00

P019 Applyingof two coats of tar nap or other wood preservative to new wood work.
Per 9.29 Sq.m.
2.046 Lit.
0.500 Day

Wood preservative
Painter
Allow for brushes, etc.

@
@

1,000.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

2,046.00
500.00
50.00
2,596.00
363.44
2,959.44
318.56
318.00

P020 Varnishing with 1 coat of Dulux polyurethane varnish after washing down & sand papering.
Per 9.29 Sq.m
0.980 Lit.
0.375 Day
0.500 Day

Polyurethene Varnish
Unskilled labour.
Painter
Allow for sand paper & brushes, etc.

@
@
@

797.00
650.00
1,000.00

Sub total
275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 139 of 263

781.06
243.75
500.00
50.00
1,574.81

O.H. 14%
Total
Say per Sq.m.

220.47
1,795.28
193.25
193.00

P021 Varnishing with 2 coats of Dulux polyurethane varnish after washing down & sand papering.
Per 9.29 Sq.m
1.667 Lit.
0.375 Day
1.000 Day

Polythene Varnish
Unskilled labour.
Painter
Allow for sand paper & brushes, etc.

@
@
@

797.00
650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

P022 Removeing existing vanishing to bare timber and preparing surface.


per 9.29Sq.m
2.000 day
Unskilled Labour
Allow for sand paper,Brushes, etc.
Sub total
O.H. 14%
Total

650.00

Say per Sq.m.

1,328.60
243.75
1,000.00
75.00
2,647.35
370.63
3,017.98
324.86
324.00

1,300.00
50.00
1,350.00
189.00
1,539.00
165.66
165.00

P023 Scraping and removeing soot on wall and leveling internaly in kitchen (extra over colour washing).
per 9.29Sq.m
0.250 day

Unskilled Labour

650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

162.50
162.50
22.75
185.25
138.45
130.00

P024 Scraping of walls to original plaster, sand preparing and lime putting cracks and defecting preparing surface
for new application of distemper, snowcem, emulsion paint or similar.
Per 9.29 Sq.m
2.000 hour
0.500 hour

Unskilled Labour
Mason
Allow for sand paper, lime putty , etc.

@
@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 140 of 263

81.25
125.00

162.50
62.50
50.00
275.00
38.50

Total
Say per Sq.m.

313.50
33.75
33.00

P025 white washing or colour washing wall with one coat of single storied building including patching and preparing
surface.
Per 92.903 Sq.m
0.750
0.113
0.113
1.000
1.000

Bush.
kg
kg
day
day

Boiled lime
Glue
Yellw ochre
Painter
Unskilled Labour
Allow for brushes cement etc.

@
@
@
@
@

445.00
231.00
40.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

333.75
26.10
4.52
1,000.00
650.00
75.00
2,089.37
292.51
2,381.89
25.64
20.00

P026 white washing or colour washing wall with two coats of single storied building including patching and preparing
surface.
Per 92.903 Sq.m
1.250
0.227
0.227
1.750
1.750

Bush.
kg
kg
day
day

Boiled lime
Glue
Yellw ochre
Painter
Unskilled Labour
Allow for brushes cement etc.

@
@
@
@
@

445.00
231.00
40.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

556.25
52.44
9.08
1,750.00
1,137.50
75.00
3,580.27
501.24
4,081.50
43.93
43.00

P027 white washing or colour washing external wall with one coat in two storied buildings.
Per 92.903 Sq.m
0.750
0.113
0.113
1.150

Bush.
kg
kg
day

Boiled lime
Glue
Yellw ochre
Painter

@
@
@
@

445.00
231.00
40.00
1,000.00

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 141 of 263

333.75
26.10
4.52
1,150.00

1.150 day

Unskilled Labour
Allow for scaffolding.
Allow for brushes cement etc.

650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

747.50
100.00
75.00
2,436.87
341.16
2,778.04
29.90
29.00

P028 white washing or colour washing external wall with one coat in building of more than two storied.
Per 92.903 Sq.m
0.750
0.113
0.113
1.250
1.250

Bush.
kg
kg
day
day

Boiled lime
Glue
Yellw ochre
Painter
Unskilled Labour
Allow for scaffolding.
Allow for brushes cement etc.

@
@
@
@
@

445.00
231.00
40.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

333.75
26.10
4.52
1,250.00
812.50
100.00
75.00
2,601.87
364.26
2,966.14
31.93
31.00

P029 white washing or colour washing external wall with two coats in two storied buildings.
Per 92.903 Sq.m
1.750
0.227
0.227
2.013
2.013

Bush.
kg
kg
day
day

Boiled lime
Glue
Yellw ochre
Painter
Unskilled Labour
Allow for scaffolding.
Allow for brushes cement etc.

@
@
@
@
@

445.00
231.00
40.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

778.75
52.44
9.08
2,013.00
1,308.45
100.00
75.00
4,336.72
607.14
4,943.86
53.22
53.00

P030 white washing or colour washing external wall with two coats in buildings of more than two storied.
Per 92.903 Sq.m
1.250 Bush.
0.227 kg

Boiled lime
Glue

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 142 of 263

445.00
231.00

556.25
52.44

0.227 kg
2.188 day
2.188 day

Yellw ochre
Painter
Unskilled Labour
Allow for scaffolding.
Allow for brushes cement etc.

@
@
@

40.00
1,000.00
650.00

Sub total
O.H. 14%
Total
Say per Sq.m.

9.08
2,188.00
1,422.20
100.00
75.00
4,402.97
616.42
5,019.38
54.03
54.00

P031 Walls internal faces scraped to original plaster patching up cracks and defects lime puttying sand papering
applying plaster of Paris and preparing surface for application of emulsion paint or enamel paint.
Per 9.29 Sq.m.
1.250 Day
0.250 Day
0.125 Day

Unskilled Labour
Mason
Painter
Allow for scraper & sandpaper
Allow Cement & lime putting
Allow for plaser of paris
Allow for scaffolding.

@
@
@

650.00
1,000.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

P032 Walls external faces scraped to original plaster patching up cracks and

812.50
250.00
125.00
50.00
50.00
30.00
100.00
1,417.50
198.45
1,615.95
173.95
173.00

defects and preparing surface

including sand papering for application of snowcem or white washing in single storied building.
Per 9.29 Sq.m.
1.250 Day
0.250 Day

Unskilled Labour
Mason
Allow for scraper & sandpaper
Allow Cement & lime putting
Allow for scaffolding.

@
@

650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

812.50
250.00
50.00
50.00
100.00
1,262.50
176.75
1,439.25
154.92
154.00

P033 Walls external faces scraped to original plaster patching up cracks and defects and preparing surface
including sand papering for application of snowcem or white washing in two storied building.
275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 143 of 263

Walls external faces scraped to original plaster patching up cracks and defects and preparing surface
including sand papering for application of snowcem or white washing in two storied building.
Per 9.29 Sq.m.
1.438 Day
0.288 Day

Unskilled Labour
Mason
Allow for scraper & sandpaper
Allow Cement & lime putting
Allow for scaffolding.

@
@

650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

P034 Walls external faces scraped to original plaster patching up cracks and

934.70
288.00
50.00
50.00
100.00
1,422.70
199.18
1,621.88
174.58
174.00

defects and preparing surface

including sand papering for application of snowcem or white washing in more than two storied building.
Per 9.29 Sq.m.
1.563 Day
0.313 Day

Unskilled Labour
Mason
Allow for scraper & sandpaper
Allow Cement & lime putting
Allow for scaffolding.

@
@

650.00
1,000.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,015.95
313.00
50.00
50.00
100.00
1,528.95
214.05
1,743.00
187.62
187.00

P035 Painting walls with 1 coat of Dulux weather shield paint including preparing surface of new work.
Per 9.29 Sq.m.
0.756 Lit
3.000 hour

Weather shield
Painter
Allow for scaffolding, brushes & sandpaper etc.
Sub total
O.H. 14%
Total

@
@

738.00
125.00

Say per Sq.m.

557.93
375.00
100.00
1,032.93
144.61
1,177.54
126.75
126.00

P36 Painting walls with 2 coats of Dulux weather shield paint including preparing surface of new work.
Per 9.29 Sq.m.
1.407 Lit
5.500 hour

Weather shield
Painter
Allow for scaffolding, brushes & sandpaper etc.
Sub total
O.H. 14%

@
@

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 144 of 263

738.00
125.00

1,038.37
687.50
100.00
1,825.87
255.62

Total
Say per Sq.m.

2,081.49
224.06
224.00

P037 Painting walls with 1 coat of weather shield paint including preparing surface of old work.
Per 9.29 Sq.m.
0.756 Lit
3.500 hour

Weather shield
Painter
Allow for scaffolding, brushes & sandpaper etc.
Sub total
O.H. 14%
Total

@
@

738.00
125.00

Say per Sq.m.

557.93
437.50
100.00
1,095.43
153.36
1,248.79
134.42
134.00

P038 Painting walls with 2 coats of weather shield paint including preparing surface of old work.
Per 9.29 Sq.m.
1.407 Lit
6.000 hour

Weather shield
Painter
Allow for scaffolding, brushes & sandpaper etc.
Sub total
O.H. 14%
Total

@
@

738.00
125.00

Say per Sq.m.

1,038.37
750.00
100.00
1,888.37
264.37
2,152.74
231.73
231.00

P039 Painting floors with 1 coat of Dulux floor paint including preparing surface.
Per 9.29 Sq.m.
0.756 Lit
0.074 Lit
3.000 hour

Floor paint
Thinner
Painter
Allow for, brushes etc.

@
@
@

884.00
430.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

668.30
31.82
375.00
50.00
1,125.12
157.52
1,282.64
138.07
138.00

P040 Painting floors with 2 coats of Dulux floor paint including preparing surface.
Per 9.29 Sq.m.
1.515 Lit
0.074 Lit
5.000 hour

Floor paint
Thinner
Painter
Allow for, brushes etc.

@
@
@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 145 of 263

884.00
430.00
125.00

1,339.26
31.82
625.00
50.00
2,046.08
286.45

Total
Say per Sq.m.

2,332.53
251.08
251.00

P041 Painting floors with 1 coat of Dulux Epoxy floor paint including preparing surface.
Per 9.29 Sq.m.
0.756 Lit
0.074 Lit
3.000 hour

Floor paint (Epoxy)


Thinner
Painter
Allow for, brushes etc.

@
@
@

1,085.00
430.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

820.26
31.82
375.00
50.00
1,277.08
178.79
1,455.87
156.71
156.00

P042 Painting floors with 2 coats of Dulux Epoxy floor paint including preparing surface.
Per 9.29 Sq.m.
1.515 Lit
0.074 Lit
5.000 hour

Floor paint (Epoxy)


Thinner
Painter
Allow for, brushes etc.

@
@
@

1,085.00
430.00
125.00

Sub total
O.H. 14%
Total
Say per Sq.m.

1,643.78
31.82
625.00
50.00
2,350.60
329.08
2,679.68
288.45
288.00

P043 Painting to MS bar for windows 1 coat of Dulux bituchem anticorrosive paint and 2 coats of Dulux Gloss
finished including preparing surface.
Per 30.48 L.m.
0.325 Lit
0.649 Lit
7.000 hour

Bituchem anticorrosive paint


Dulux gloss finish
Painter
Allow for, brushes etc.

@
@
@

586.00
768.00
125.00

Sub total
O.H. 14%
Total
Say per L.m.

190.45
498.43
875.00
50.00
1,613.88
225.94
1,839.83
60.36
60.00

P044 Painting to MS bar for windows 2 coats of Dulux bituchem anticorrosive paint and 1 coat of Dulux Gloss
finished including preparing surface.
Per 30.48 L.m.

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 146 of 263

0.649 Lit
0.325 Lit
7.000 hour

Bituchem anticorrosive paint


Dulux gloss finish
Painter
Allow for, brushes etc.

@
@
@

586.00
768.00
125.00

Sub total
O.H. 14%
Total
Say per L.m.

380.31
249.60
875.00
50.00
1,554.91
217.69
1,772.60
58.16
58.00

P045 Painting to MS bar for windows 2 coats of Dulux Gloss finished including preparing surface.
Per 30.48 L.m.
0.649 Lit
6.000 hour

Dulux gloss finish


Painter
Allow for, brushes etc.

@
@

768.00
125.00

Sub total
O.H. 14%
Total
Say per L.m.

275544406.xls - DEPARTMENT OF BUILDINGS - P - Page No: 147 of 263

498.43
750.00
50.00
1,298.43
181.78
1,480.21
48.56
48.00

Q - PLUMBER
Q001 Ball valve 20mm supplied & fixed.
Per No.
1.000 No.
0.500 hour
0.500 hour

20mm Ball valve


Plumber
Labourer

@
@
@

122.00
125.00
81.25

122.00
62.50
40.63
225.13
31.52
256.64
256.00

221.75

221.75
103.13
324.88
45.48
370.36
370.00

237.00
125.00
81.25

237.00
93.75
60.94
391.69
54.84
446.52
446.00

188.09
125.00
81.25

188.09
125.00
81.25

Sub total
O.H. 14%
Total
Say per No.
Q002 Ball valve 25mm supplied & fixed.
Per No.
1.000 No.

25mm Ball valve


Labourer as in item 1

@
Sub total
O.H. 14%
Total
Say per No.

Q003 Ball valve 32mm supplied & fixed.


Per No.
1.000 No.
0.750 hour
0.750 hour

32mm Ball valve


Plumber
Labourer

@
@
@
Sub total
O.H. 14%
Total
Say per No.

Q004 Ball valve 40mm supplied & fixed.


Per No.
1.000 No.
1.000 hour
1.000 hour

32mm Ball valve


Plumber
Labourer

@
@
@
Sub total
O.H. 14%
Total

Say per No.


Say per L.m.

394.34
55.21
449.54
449.00
449.00

Q005 Ball valve 20mm to 32mm fixed (valve supplied by Dept.)


Per No.
Labourer as in item 1
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 148 of 263

103.13
103.13
14.44
117.56

Say per No.

117.00

Q006 Ball valve repaired & fixed.


Per No.

1.000 hour

Removing & refixing labour as in item 1


Reparing & refixing Tniker
Allow for lead etc.
Sub total
O.H. 14%
Total

125.00

Say per No.

103.13
125.00
50.00
278.13
38.94
317.06
317.00

Q007 Basin, lavatory fixied to wall and connected to exisiting water service & making good (basin, brackets &
fittings supplied by Dept.)
Per No.

4.000 Nos.
1.000 hour
1.000 hour
6.000 hour
6.000 hour
1.000 hour
1.000 hour

Fixing plugs in wall;


Plugs
Mason
Labour
Fixing basin & taps;
Plumber
Labour
Making hall in wall & making good;
Labour
Mason
Allow for screws, cement, red lead etc.

@
@
@

15.00
125.00
81.25

60.00
125.00
81.25

@
@

125.00
81.25

750.00
487.50

@
@

81.25
125.00

81.25
125.00
50.00
1,760.00
246.40
2,006.40
2,006.00

125.00
81.25

500.00
325.00
50.00
875.00
122.50
997.50
997.00

Sub total
O.H. 14%
Total
Say per No.

Q008 Basin, lavatory fixied on existing brackets (tap waste trap & basing supplied by Dept.)
Per No.
4.000 hour
4.000 hour

Plumber
Labour
Allow for red lead etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

Q009 Basin, lavatory white medium (550x440mm round/sq) with 1 tap waste plugs, new brackets supplied and
fixied complete (additional tap, trap paid for seperately)
Per No.
1.000 No.
Basin complete with brackets. (Coloured)
@
1,750.00
1,750.00
2.000 No.
Add for Brackets
@
175.00
350.00
tap etc. and transport.
75.00
Fixing as in item 7
1,760.00
Sub total
3,935.00
275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 149 of 263

O.H. 14%
Total

550.90
4,485.90
4,485.00

Say per No.


Q010 -do-

-do-

Supplied and fixed existing brackets -do-

-do-

-do-

Per No.
Basin on existing brackets transport etc.
Deduct for brackets.
Fixing as in Item No.8
Sub total
O.H. 14%
Total

2.000 No.

175.00

Say per No.

Q011 -do-

-do-

(625x45mm large) with new brackets

-do-

-do-

-do-

-do-

3,780.00

175.00

2,175.00
-350.00
875.00
2,700.00
378.00
3,078.00
3,078.00

Per No.
1.000 No.

Large Basin complete with brackets (Coloured


Trans port
Add for Brackets
Fxing as in Item No: 7
Sub total
O.H. 14%
Total

2.000 No.

Say per Sq.m.

Q012 -do-

-do-

on existing brackets -do-

-do-

3,780.00
150.00
350.00
1,760.00
6,040.00
845.60
6,885.60
370.39
370.00

-do-

Per No.

2.000 No.

Large Basin complete with brackets & transport


Less cost of brackets
Fixing as in Item No.8
Sub total
O.H. 14%
Total

175.00

Say per No.

3,930.00
-350.00
875.00
4,455.00
623.70
5,078.70
5,078.00

Q013 Basin sink or urinal including all fittings removed and walls made good.
Per No.
3.000
3.000
1.000
1.000

Hour
Hour
Hour
Hour

Plumber removing basin


Brackets & pipes
Labour to assist
Mason making good to walls & floors
Labour to assist
Allow for cement, lime etc.

@
@
@
@
Sub total

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 150 of 263

125.00
81.25
125.00
81.25

375.00
243.75
125.00
81.25
50.00
875.00

O.H. 14%
Total

122.50
997.50
997.00

Say per No.

Q014 Baths C.I. Enamel removing & re-fixing in new position & making good to walls & floors ( extra piping required
paid separately.)
Per No.
2.000 hour
1.000 day
4.000 hour

Plumber & mate removing old bath


Plumber & mate fixing new bath & out let pipes
Mason & mate making good to trenches, walls
Allow for cement, lime etc.
Sub total
O.H. 14%
Total

@
@
@

206.25
1,650.00
1,081.25

Say per No.

412.50
1,650.00
4,325.00
50.00
6,437.50
901.25
7,338.75
7,338.00

Q015 Closet pedestal type available at site, fixed with cement conc. after breaking conc. floors & making good &
making connection to soil and flush pipes.
Per No.
0.250 50 kg
0.750 day
0.750 day

Cement
Allow for metal, sand, red lead, hemp etc.
Plumber
Labour
Sub total
O.H. 14%
Total

749.00

@
@

1,000.00
650.00

Say per No.

187.25
150.00
750.00
487.50
1,574.75
220.47
1,795.22
1,795.00

Q016 Closet pedestal type, disconnecting & plugging sewer connection & making good all affected walls & floors..
Per No.
0.170 50 kg
0.500 day
0.500 day

Cement
Allow for metal, sand, red lead, hemp etc.
Plumber
Labour
Sub total
O.H. 14%
Total

749.00

@
@

1,000.00
650.00

Say per No.

127.33
150.00
500.00
325.00
1,102.33
154.33
1,256.66
1,256.00

Q017 Closet only pedestal type supplied and fixed (Hardwood seat & cover available)
Per No.
1.000 No

Pedestal closet
Allow for transport
Fixing as in item No:15

2,415.00

Sub total
O.H. 14%
Total
275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 151 of 263

2,415.00
100.00
1,574.75
4,089.75
572.57
4,662.32

Say per No.

4,662.00

Q018 Closet pedestal type, with low level (Plastic) flushing cistern flush pipe double plastic seat cover 20mm stop
cock trap etc. supplied & fixed complete.
Per No.
1.000 No
1.000 No.
1.000 day
1.000 day

Low level closet suite. (white)


Allow for transport
20mm stop cock
Cement, metal, sand, red lead etc. (Item 15)
Plumber
Labour
Sub total
O.H. 14%
Total

5,500.00

94.50

@
@

1,000.00
650.00

Say per No.

5,500.00
100.00
94.50
337.25
1,000.00
650.00
7,681.75
1,075.45
8,757.20
8,757.00

Q019 Closet squatting type large with trap with supplied & fixed squatting pan & trap.
Per No.
1.000 No
0.330 kg
1.000 day
1.000 day

Squatting pan & trap


Allow for transport
Cement
Allow for metal and sand etc.
Plumber
Labour

1,200.00

749.00

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per No.

1,200.00
100.00
247.17
150.00
1,000.00
650.00
3,347.17
468.60
3,815.77
3,815.00

Q020 Closet squatting type medium with trap with supplied & fixed squatting pan & trap.
Per No.
1.000 No
0.330 cwt.
1.000 day
1.000 day

Squatting pan & trap


Allow for transport
Cement
Allow for metal and sand etc.
Plumber
Labour

700.00

749.00

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per No.
Q021 Closet squatting type removed sewer connection plugged & floor made good.
Per No.

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 152 of 263

700.00
100.00
247.17
150.00
1,000.00
650.00
2,847.17
398.60
3,245.77
3,245.00

0.900 cwt.
0.500 day
0.500 day

Cement
Allow for metal and sand etc.
Plumber
Labour

749.00

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per No.

674.10
100.00
500.00
325.00
1,599.10
223.87
1,822.97
1,822.00

Q022 Closet squatting type fixed, including breaking floor & fixed in cement concrete (closet supplied by Dept.)
Per No.
0.330 cwt.
0.750 day
0.750 day

Cement
Allow for metal and sand etc.
Plumber
Labour

749.00

@
@

1,000.00
650.00

Sub total
O.H. 14%
Total
Say per No.

247.17
100.00
750.00
487.50
1,584.67
221.85
1,806.52
1,806.00

Q023 Closet squatting type fixed, including flushing cistern & pipes complete (closet and all fittings supplied by
Dept.)
Per No.
6.000 Nos.
1.000 hour
1.000 hour

0.500 day
5.000 day

Plugs
@
15.00
Mason
@
125.00
Labour
@
81.25
Fixing squatting pan as in item 20
Cistern & flush pipe, & making connection to water supply.
Plumber
@
125.00
Labour
@
81.25
Allow for clips for flush
Sub total
O.H. 14%
Total
Say per No.

90.00
125.00
81.25
2,847.17
62.50
406.25
75.00
3,687.17
516.20
4,203.37
4,203.00

Q024 Cock , brass bib 20mm supplied & fixed.


Per No.
1.000 No.
0.330 hour
0.330 hour

20mm Brass bib tap


Allow for metal and lead etc.
Plumber
Labour

400.00

@
@

125.00
81.25

Sub total
O.H. 14%
Total
Say per No.

Q025 Cock , brass any size bib flush or stop cock 20mm to 50mm removed.
275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 153 of 263

400.00
100.00
41.25
26.81
568.06
79.53
647.59
647.00

Per No.
0.170 hour
0.170 hour

Plumber
Labour

@
@

125.00
81.25

21.25
13.81
35.06
4.91
39.97
39.00

125.00
81.25
7.00

62.50
40.63
7.00
110.13
15.42
125.54
125.00

420.00
125.00
81.25

420.00
250.00
162.50
832.50
116.55
949.05
949.00

125.00

31.25
25.00
56.25
7.88
64.13
64.00

Sub total
O.H. 14%
Total
Say per No.

Q026 Cock bib , or stop repaired by fixing leather washers.


Per No.
0.500 hour
0.500 hour
1.000 No.

Plumber
Plumber's mate
Leather washer

@
@
@
Sub total
O.H. 14%
Total
Say per No.

Q027 Seat & cover for pedestal closet in plastic supplied & fixed.
Per No.
1.000 No.
2.000 hour
2.000 hour

Plastic seat & cover


Plumber
Plumber's mate

@
@
@
Sub total
O.H. 14%
Total
Say per No.

Q028 Flushing cistern cleaned & paint one coat of anticorrosive paint internally.
Per No.
0.250 hour

Plumber
Allow for paint, brushes etc.

@
Sub total
O.H. 14%
Total
Say per No.

Q029 Flushing cistern cast Iron 9 Lit. excluding flush pipe, brackets & including ball valve supplied & fixed.
Per No.
1.000 No.
0.500 day
0.500 day

Cast Iron cistern


Plumber
Plumber's mate

@
@
@

1,942.50
125.00
81.25

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 154 of 263

1,942.50
62.50
40.63

Sub total
O.H. 14%
Total

2,045.63
286.39
2,332.01
2,332.00

Say per No.

Q030 Flushing cistern fixed complete (cistern & brackets supplied)


Per No.
4.000 Nos.
1.000 hour
1.000 hour

0.500 day
0.500 day

Plugs
Mason
Labour
Allow for cement etc.
Fixing & making connection
Plumber
Labour
Allow for red lead.

@
@
@

15.00
125.00
81.25

60.00
125.00
81.25
25.00

@
@

1,000.00
650.00

500.00
325.00
50.00
1,166.25
163.28
1,329.53
1,329.00

Sub total
O.H. 14%
Total
Say per No.
Q031 Flushing cistern low level, plastic supplied & fixed complete.
Per No.
1.000 No.
0.500 hour
0.500 hour

Low level plastic cistern


Plumber
Plumber's mate
Allow for cement etc.

@
@
@

2,350.00
125.00
81.25

Sub total
O.H. 14%
Total
Say per No.

2,350.00
62.50
40.63
50.00
2,503.13
350.44
2,853.56
2,853.00

Q032 Flushing cistern, level forged out of wrought Iron 25x4.5mm approx 450mm long bent to shape, drilled at both
ends & fitted in position in cistern.
Per No.
0.500 day
0.500 day
1.000 hour
1.000 hour

Black smith
Below boys
Allow for steel
Plumber
Labour
Allow for cement etc.

@
@

1,000.00
650.00

@
@

125.00
81.25

Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 155 of 263

500.00
325.00
75.00
125.00
81.25
50.00
1,156.25
161.88
1,318.13

Say per No.

1,318.00

Q033 Flushing cistern, disconnecting and plugging water connection making good all damage to walls, floors etc.
Per No.
0.500 day
0.500 day
1.000 No.

Plumber
Labour
Plug 12mm
Allow for red lead, cement etc.

@
@
@

1,000.00
650.00
15.00

Sub total
O.H. 14%
Total
Say per No.

500.00
325.00
15.00
50.00
890.00
124.60
1,014.60
1,014.00

Q034 Flushing cistern, removing and re-fixing in new position including necessary plugs & making good to walls.
Per No.
Removing cistren & making good to wall
As in Item No:33
Fixing cistern in new position
As in Item No:30
Sub total
O.H. 14%
Total

890.00
1,166.25
2,056.25
287.88
2,344.13
2,344.00

Say per No.

Q035 Mirror, bellowed, bathroom type 500x450mm supplied & fixed to wall with rawl plugs & chromium plated
fittings.
Per No.
1.000 No.
2.000 hours

Mirror with fittings


Allow for rawl plugs & screws
Plumber

750.00

125.00

Sub total
O.H. 14%
Total
Say per No.

750.00
50.00
250.00
1,050.00
147.00
1,197.00
1,197.00

Q036 Piller cock fixed in basin carefully repaired without damage to basin.
Per No.
1.500 day

Plumber
Allow for washers, red lead etc.

1,000.00

Say per No.

1,500.00
50.00
1,550.00
217.00
1,767.00
1,767.00

@
@

1,350.00
93.75

Sub total
O.H. 14%
Total

Q037 Piller cock 20mm chromium plated supplied and fixed to basin.
Per No.
1.000 No.
0.750 hour

Piller cock 20mm


Plumber, removing old tap & fixing new

1,350.00
125.00

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 156 of 263

0.750 hour

Plumber's mate
Allow for red lead etc.

81.25

60.94
50.00
1,554.69
217.66
1,772.34
1,772.00

206.25

51.56
50.00
101.56
14.22
115.78
115.00

206.25

154.69
50.00
204.69
28.66
233.34
233.00

Sub total
O.H. 14%
Total
Say per No.
Q038 Shower rose, any size fixed (shower rose supplied by Dept.)
Per No.
0.250 hour

Plumber & mate


Allow for red lead etc.

@
Sub total
O.H. 14%
Total
Say per No.

Q039 Shower rose, soldered and re-fixed.


Per No.
0.750 hour

Plumber & mate


Allow for red lead etc.

@
Sub total
O.H. 14%
Total
Say per No.

Q040 Sink any size fixed complete with waste plug tap & brackets (sink & fittings supplied by Dept.)
Per No.
As per basins Item No:7

1,237.50
1,237.50
173.25
1,410.75
1,410.00

Sub total
O.H. 14%
Total
Say per No.

Q041 Sink (stain less steel) fixed with waste plug brackets etc. complete.
Per No.
1.000 No.
2.000 Nos.
1.500 hours
0.500 day

Sink 61x39x19.5 cm waste plug & chain


Allow for transport
Tee iron brackets
plumber & mate
Fixing sink & outlet pipe making hole in wall etc.
plumber & mate
Allow for cement.
Sub total
O.H. 14%
Total

3,350.00

@
@

157.50
206.25

1,650.00

Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 157 of 263

3,350.00
100.00
315.00
309.38
825.00
50.00
4,949.38
692.91
5,642.29
5,642.00

Q042 Sink (Stainless steel Double board) fixed with waste plug, 112mm brick wall support and 1:3 cement sand
plastering.
Per No.
1.000 No.
1.500 hours
0.410 Sq.m
0.930 Sq.m
0.500 day

Q043 Sink
Per No.

-do-

Sink 61x39x19.5 cm waste plug & chain


Allow for transport
plumber & mate
112mm brik work
1:3 cement plaster
Fixing sink & outlet pipe making hole in wall etc.
plumber & mate
Allow for cement.
Sub total
O.H. 14%
Total

-do-

-do-

8,000.00

@
@
@

206.25
1,030.00
397.00

1,650.00

8,000.00
100.00
309.38
422.30
369.21

Say per No.

825.00
50.00
10,075.89
1,410.62
11,486.51
11,486.00

Say per No.

4,949.38
-365.00
4,584.38
641.81
5,226.19
5,226.00

on existing supports.

As in Item No: 41
Less brackets, fixing & cement.
Sub total
O.H. 14%
Total

Q044 Stainless steel sink (single board), 112mm brick wall support and 1:3 cement sand plastering.
Per No.
1.000 No.
0.250 Sq.m
0.580 Sq.m

Sink with waste plug & chain (lab)


Allow for transport
112mm brick work
1:3 cement plaster
Fixing as in Item No:42

3,350.00
1,030.00
397.00

Sub total
O.H. 14%
Total
Say per No.

3,350.00
100.00
257.50
230.26
1,975.89
5,913.65
827.91
6,741.56
6,741.00

Q045 Ceramic labsink coloured 46x32.5x18 cm supplied & fixed with waste plug, brackets etc.
Per No.
1.000 No.

Sink with waste plug & chain (lab)


Allow for transport
Brackets & fixing as in Item No:41

3,150.00

Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 158 of 263

3,150.00
100.00
1,499.38
4,749.38
664.91
5,414.29
5,414.00

Q046 Sink
Per No.

-do-

-do-

fixed on existing supports.

As in Item No: 45
Less brackets, fittings

Say per No.

4,749.38
-1,499.38
3,250.00
455.00
3,705.00
3,705.00

Say per No.

875.00
1,760.00
2,635.00
368.90
3,003.90
3,003.00

Sub total
O.H. 14%
Total

Q047 Sink or basin, removed & refixed in new position.


Per No.
Removing sink & making good to wall as in Item No:13
Fixing in new position as in item No:7
Sub total
O.H. 14%
Total

Q048 Sink built in cement 1:5 and cement rendered 12mm (1:2) 600x600mm 150mm high curb including making
hall in wall & supplying & fixing 63mm outlet pipe.
Per No.
30.000
0.500
0.370
0.750
0.750
2.000

Nos.
Bag
Cu.m
day
day
m

Bricks
Cemant
Sand
Mason
Labour
Pipe 63mm

@
@
@
@
@
@

7.20
749.00
2,000.00
1,000.00
650.00
576.00

Sub total
O.H. 14%
Total
Say per No.

216.00
374.50
740.00
750.00
487.50
1,152.00
3,720.00
520.80
4,240.80
4,240.00

Q049 Soap tray white porcelain, supplied & fixed to wall with rawl plugs.
Per No.
1.000 No.
1.000 hour

Soap Tray
Plumber
Allow rawl plug & screws.

@
@

650.00
125.00

650.00
125.00
35.00
810.00
113.40
923.40
923.00

94.50
206.25

94.50
103.13
40.00
237.63
33.27

Sub total
O.H. 14%
Total
Say per No.
Q050 Stop cock 20mm , supplied & fixed PVC
Per No.
1.000 No.
0.500 hour

20mm Stop cock (PVC)


Plumber & mate
Allow rawl plug & screws.

@
@
Sub total
O.H. 14%

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 159 of 263

Total

270.89
270.00

Say per No.


Q051 Stop cock PVC 25mm , supplied & fixed (with Italy made)
Per No.
1.000 No.

25mm Stop cock (PVC)


labour etc. as in item No:50

189.00

189.00
143.13
332.13
46.50
378.62
378.00

210.00

210.00
143.13
353.13
49.44
402.56
402.00

409.50

409.50
143.13
552.63
77.37
629.99
629.00

441.00

441.00
143.13
584.13
81.78
665.90
665.00

651.00
206.25

651.00
129.94
332.13
1,113.06
155.83
1,268.89
1,268.00

Sub total
O.H. 14%
Total
Say per No.
Q052 Stop cock brass 32mm , supplied & fixed (with Italy made)
Per No.
1.000 No.
32mm Stop cock (PVC)
labour etc. as in item No:50

@
Sub total
O.H. 14%
Total
Say per No.

Q053 Stop cock PVC 40mm , supplied & fixed (with Italy made)
Per No.
1.000 No.
40mm Stop cock (PVC)
labour etc. as in item No:50

@
Sub total
O.H. 14%
Total
Say per No.

Q054 Stop cock PVC 50mm , supplied & fixed (with Italy made)
Per No.
1.000 No.
50mm Stop cock PVC
labour etc. as in item No:50

@
Sub total
O.H. 14%
Total
Say per No.

Q055 Stop cock PVC 63mm , supplied & fixed (with Italy made)
Per No.
1.000 No.
0.630 hours

63mm Stop cock PVC


Plumber & mate
Allow for red lead etc.

@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 160 of 263

Q056 Tooth brush holder chromium plated supplied & fixed to wall with rawl plug.
Per No.
1.000 No.
1.000 hours

Tooth brush holder


Plumber
Allow for rawl plugs & screws

@
@

550.00
125.00

550.00
125.00
25.00
700.00
98.00
798.00
798.00

625.00

625.00
71.25
696.25
97.48
793.73
793.00

500.00

500.00
71.25
571.25
79.98
651.23
651.00

3,700.00

@
@
@

15.00
206.25
1,650.00

3,700.00
100.00
30.00
103.13
825.00
696.25
5,454.38
763.61
6,217.99
6,217.00

Sub total
O.H. 14%
Total
Say per No.

Q057 Towel rail, chromium plated supplied & fixed to wall with rawl plug.
Per No.
1.000 No.

Towel rail
Fixed as in Item No:50

@
Sub total
O.H. 14%
Total
Say per No.

Q058 Toilet paper holder 150mm x 150mm (ceremic cop.)


Per No.
1.000 No.

Paper holder
Fixed as in Item No:50

@
Sub total
O.H. 14%
Total
Say per No.

Q059 Urinal, wall type supplied & fixed.


Per No.
1.000 No.
2.000 No.
0.500 hour
0.500 day

Urinal
Allow for transport
Wood plugs
Mason & labour
Plumber & mate
Allow for cement, screws etc.
Sub total
O.H. 14%
Total

Say per No.


Q060 Urinal, wall type available fixed.
Per No.
As in Item No:59
Less cost of Urinal & transport
Sub total
275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 161 of 263

5,454.38
-3,800.00
1,654.38

O.H. 14%
Total

231.61
1,885.99
1,885.00

Say per No.


Q061 Bends, Elbows & tees & other specials of PVC sizes up to 90mm fixed (fittings supplied by Dept.)
Per No.
0.100 hour
0.100 hour

Plumber
Labour
Allow for solvent, cement, petrol, blow lamp, etc.
Sub total
O.H. 14%
Total

@
@

125.00
81.25

12.50
8.13
50.00
70.63
9.89
80.51
80.00

18.90

18.90
70.63
89.53
12.53
102.06
102.00

25.20

25.20
70.63
95.83
13.42
109.24
109.00

36.75

36.75
70.63
107.38
15.03
122.41
122.00

73.50

73.50
70.63
144.13
20.18
164.30

Say per No.


Q062 Bends PVC sizes up to 20mm supplied & fixed.
Per No.
1.000 hour

20mm bend
Fixed as in Item 61

@
Sub total
O.H. 14%
Total
Say per No.

Q063 Bends PVC 25mm supplied & fixed.


Per No.
1.000 No.

25mm bend
Fixed as in Item 61

@
Sub total
O.H. 14%
Total
Say per No.

Q064 Bends PVC 32mm supplied & fixed.


Per No.
1.000 No.

32mm bend
Fixed as in Item 61

@
Sub total
O.H. 14%
Total
Say per No.

Q065 Bends PVC 40mm supplied & fixed.


Per No.
1.000 No.

40mm bend
Fixed as in Item 61

@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 162 of 263

Say per No.

164.00

Q066 Forming bends or jointing pipes by heating without fixing special in rigid PVC 40mm to 63mm (pipe supplied
by Dept.)
Per No.
0.17 hour
0.17 hour

Plumber
Labour
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

@
@

125.00
81.25

Say per No.

21.25
13.81
12.53
47.60
6.66
54.26
54.00

Q067 Forming bends or jointing pipes by heating without fixing special in rigid PVC 75mm to 90mm (pipe supplied
by Dept.)
Per No.
0.200 hour
0.200 hour

Plumber
Labour
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

@
@

125.00
81.25

25.00
16.25
50.00
91.25
12.78
104.03
104.00

53.00

@
@

125.00
81.25

1,590.00
397.50
250.00
162.50
50.00
125.00
2,575.00
360.50
2,935.50
97.85
97.00

Say per No.

Q068 Pipes PVC 20mm supplied & fixed (Type 1000)


Per 30 m.
30.000 m.
2.000 hours
2.000 hours

20mm Pipe
For specials 25%
Plumber
Labour
Allow for solvent cement petrol, blow lamp etc.
Allow for saddles / clips with screws
Sub total
O.H. 14%
Total

Say per m.
Q069 Pipes PVC 25mm supplied & fixed (Type 1000)
Per 30 m.
30.000 m.

25mm Pipe
For specials 25%
Labour as in item No:68
Allow for solvent cement petrol, blow lamp etc.
Allow for saddles / clips with screws
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 163 of 263

107.25

3,217.50
804.38
412.50
50.00
125.00
4,609.38
645.31
5,254.69

175.16
175.00

Say per m.
Q070 Pipes PVC 32mm supplied & fixed (Type 1000)
Per 30 m.
30.000 m.
Add excavation
1.500 day
Return fill
0.750 day
3.000 hours
3.000 hours

32mm Pipe
For specials 25%

160.00

4,800.00
1,200.00

Labour

650.00

975.00

Labour
Plumber
Labour
Allow for saddles / clips with screws
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

@
@
@

650.00
125.00
81.25

487.50
375.00
243.75
110.00
75.00
8,266.25
1,157.28
9,423.53
314.12
314.00

84.00

2,520.00
630.00
2,266.25
5,416.25
758.28
6,174.53
205.82
205.00

237.00

@
@

125.00
81.25

7,110.00
1,777.50
500.00
325.00
100.00
150.00
9,962.50
1,394.75
11,357.25
378.58
378.00

Say per m.

Q071 Pipes PVC 32mm supplied & fixed (Type 600)


Per 30 m.
30.000 m.
32mm Pipe (type 600)
For specials 25%
Labour as in Item No:70

Sub total
O.H. 14%
Total
Say per m.
Q072 Pipes PVC 40mm supplied & fixed (Type 1000)
Per 30 m.
30.000 m.
4.000 hours
4.000 hours

40mm Pipe
For specials 25%
Plumber
Labour
Allow for solvent cement petrol, blow lamp etc.
Allow for saddles / clips with screws
Sub total
O.H. 14%
Total

Say per m.
275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 164 of 263

Q073 Pipes PVC 50mm supplied & fixed (Type 1000)


Per 30 m.

30.000 m.

Excavation & re-filling as in Item No:70


50mm Pipe
For specials 25%
Labour as in Item 72
Allow for saddles / clips with screws
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

341.00

Say per m.

2,081.25
10,230.00
2,557.50
825.00
150.00
375.00
16,218.75
2,270.63
18,489.38
616.31
616.00

Q074 Pipes PVC 40mm supplied & fixed (Type 600)


Per 30 m.
30.000 m.

40mm Pipe
For specials 25%
Labour as in Item No: 72

165.00

4,950.00
1,237.50
825.00
7,012.50
981.75
7,994.25
266.48
266.00

221.00

6,630.00
1,657.50
2,081.25
825.00
525.00
11,718.75
1,640.63
13,359.38
445.31
445.00

Sub total
O.H. 14%
Total
Say per m.

Q075 Pipes PVC 50mm supplied & fixed (Type 600)


Per 30 m.
30.000 m.

50mm Pipe
For specials 25%
Excavation & re-filling as in item No:70
Labour as in item No:73
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

Say per m.
Q076 Pipes PVC 63mm supplied & fixed (Type 1000)
Per 30 m.
Excavation & re-filling as in Item No:70
30.000 m.
63mm Pipe
For specials 25%
5.000 hour
Plumber
5.000 hour
Labour
Allow for solvent cement petrol, blow lamp etc.
Sub total

576.25

@
@

125.00
81.25

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 165 of 263

2,081.25
17,287.50
4,321.88
625.00
406.25
525.00
25,246.88

O.H. 14%
Total

3,534.56
28,781.44
959.38
959.00

Say per m.
Q077 Pipes PVC 63mm supplied & fixed (Type 600)
Per 30 m.
30.000 m.
63mm Pipe
For specials 25%
Excavation & re-filling as in item No:70
5.000 hour
Plumber
5.000 hour
Labour
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

367.00

@
@

125.00
81.25

Say per m.

11,010.00
2,752.50
2,081.25
625.00
406.25
525.00
17,400.00
2,436.00
19,836.00
661.20
661.00

Q078 Pipes PVC 90mm supplied & fixed (Type 1000)


Per 30 m.
30.000 m.
5.000 hours
5.000 hours

90mm Pipe
For specials 25%
Plumber
Labour
Allow for solvent cement petrol, blow lamp etc.
Allow for saddles / clips with screws
Sub total
O.H. 14%
Total

1,426.00

@
@

125.00
81.25

Say per m.

Q079 Pipes PVC 160mm supplied & fixed (Type 1000)


Per 30 m.
30.000 m.
160mm Pipe
For specials 25%
5.000 hour
Plumber
5.000 hour
Labour
Allow for solvent cement petrol, blow lamp etc.
Sub total
O.H. 14%
Total

42,780.00
10,695.00
625.00
406.25
100.00
150.00
54,756.25
7,665.88
62,422.13
2,080.74
2,080.00

4,438.00 133,140.00
33,285.00
@
111.00
555.00
@
81.25
406.25
17,400.00
184,786.25
25,870.08
210,656.33
7,021.88
Say per m.
7,021.00

Q080 Closet squatting type large with trap supplied & fixed complete with plastic cistern flush pipe etc. including
12mm stop cock & specials.
Per 30 m.
1.000 No.

Squatting pan with trap


transport

1,200.00

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 166 of 263

1,200.00
300.00

0.330 kg
1.000 day
1.000 day
1.000
2.000
2.000
1.000
1.000
4.500
4.500

No.
No.
No.
hour.
hour.
hour.
hour.

0.670
1.000
2.000
1.000

Doz.
No.
No.
No.

Cement
Allow for metal & sand etc.
Plumber
Labour
Flushing cistern complete with flush, pipe Chain, overflow pipe etc. including tr.
Clips
Plastic rawl plugs
Mason
Labour
Labour
Plumber
Allow for cement, sand & red lead etc.
37mm screws
20mm stop cock PVC
Valve socket
Faucet socket
Sub total
O.H. 14%
Total

749.00

@
@

1,000.00
650.00

@
@
@
@
@
@
@

2,350.00
17.85
5.00
125.00
81.25
81.25
125.00

@
@
@
@

1.60
94.50
20.00
20.00

247.17
150.00
1,000.00
650.00
2,350.00
35.70
10.00
125.00
81.25
365.63
562.50
50.00
1.07
94.50
40.00
20.00
7,282.82
1,019.59
8,302.41

Say per No.

8,302.00

1,650.00

125.00

1,650.00
412.50
62.50
2,125.00
297.50
2,422.50
2,422.00

Q081 Suppling and Fixing 150x20mm PVC shower rose.


Per No.
1.000 No.
0.500 hour

150x20mm PVC shower rose.


Allow for solvant cement.
Plumber
Sub total
O.H. 14%
Total

Say per No.

Q082 Suppling and Fixing plastic seat cover


Per No.
1.000 No.
2.000 hour
2.000 hour

Seat cover
Plumber
Labour

@
@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - Q - Page No: 167 of 263

420.00
125.00
81.25

420.00
250.00
162.50
832.50
116.55
949.05
949.05
949.00

R - DRAIN LAYER
R001 Bends PVC 110mm supplied & fixed (type 600)
Per No.
1.000 No.
0.250 hour

110mm Bend
Plumber & Mate
Allow for solvant cement

@
@

1,249.50
206.25

Sub total
O.H. 14%
Total
Say per No.

1,249.50
51.56
50.00
1,351.06
189.15
1,540.21
1,540.00

R002 Connection to existing sewer or manhole.


Per No.
0.500 day
0.200 bag

Plumber & Mate


Cement
Allow for sand & stone.

@
@

1,650.00
749.00

Sub total
O.H. 14%
Total
Say per No.

825.00
149.80
100.00
1,074.80
150.47
1,225.27
1,225.00

R003 Drains PVC 110mm laid on cement conc. 150mm thick up to 600mm depth of invert including excavation &
cement conc. Hunching 1:3:6(40)
Per 30.48 m.
14.169 Cu.m
1.899 Cu.m
0.283 Cu.m
0.500 day
30.480 m.

Excavation & refilling.


1:3:6(40) cement conc. bed 400x150mm
Concrete 1:3:6(40) Haunching)
Haunching Add Labour cost 50%
Plumber & Mate
PVC pipe (type 450)
Allow for transport
Sub total
O.H. 14%
Total

376.00
11,976.49
11,976.49
@
@

1,650.00
278.25

5,327.54
22,743.35
3,389.35
1,694.67
825.00
8,481.06

100
42,560.97
5,958.54
48,519.50
1,591.85
1,591.00

Say per m.

R004 Drains PVC 110mm laid on 1:3:6(40) cement conc. 150mm thick depth of invert over 600mm & up to
1.200mm including excavation & cement conc. hunching & shorting sides where necessary.
Per 30.48 m.
As in Item No:3
11.335 Cu.m

42,560.97

Add extra excavation Iten B2


Allow for shring sides where necessary

@
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - R - Page No: 168 of 263

441.00

4,998.74
100.00
47,659.70
6,672.36
54,332.06
1,782.55

Say per m.

1,782.00

R005 Drains PVC 110mm laid on 1:3:6(40) cement conc. 150mm thick depth of invert over 1200mm & up to
1800mm including excavation & cement conc. hunching & shorting sides where necessary.
Per 30.48 m.

22.671 Cu.m
0.500 day
0.125 day

As in Item No:3
Add extra excavation Iten B2
Add Lift over Labour
Add extra Labour in laying of Item No:4
Sub total
O.H. 14%
Total

@
@
@

441.00
650.00
650.00

Say per m.

42,560.97
9,997.91
325.00
81.25
52,965.13
7,415.12
60,380.25
1,980.98
1,980.00

R006 Grating PVC 150x150mm supplied & fixed.


Per 1 No.
1.000 No.
0.125 hour

Gully Grating 150x150mm


Labour

@
@

195.00
81.25

195.00
10.16
205.16
28.72
233.88
233.00

65.00
81.25
2,000.00
4,155.00
749.00
206.25

65.00
20.31
60.00
249.30
187.25
412.50
100.00
1,094.36
153.21
1,247.57
1,247.00

Sub total
O.H. 14%
Total
Say per No.

R007 Gully PVC 100mm supplied & fixed including gully box.
Per 1 No.
1.000
0.250
0.030
0.060
0.250
2.000

No.
hour
Cu.m
Cu.m
bag
hour

Gully 100mm
Labour
Sand
1" Metal
Cement
Mason & Labour
Allow for Shuttering

@
@
@
@
@
@
Sub total
O.H. 14%
Total

Say per No.


R008 Gully PVC 150mm available fixed including gully box.
Per 1 No.
0.250
0.060
0.030
0.250
2.000

hour
Cu.m
Cu.m
bag
hour

Labour
1" Metal
Sand
Cement
Mason & Labour
Allow for Shuttering

@
@
@
@
@

81.25
4,155.00
2,000.00
749.00
206.25

Sub total
O.H. 14%
275544406.xls - DEPARTMENT OF BUILDINGS - R - Page No: 169 of 263

20.31
249.30
60.00
187.25
412.50
100.00
1,029.36
144.11

Total

1,173.47
1,173.00

Say per No.

R009 Manhole 600x600mm & unto 600mm deep 225mm thick brick in cement 1:3 walls & cement rendered 12mm
(1:2) with 150mm cement conc. foundation 1:3:6(40) including forming channels, but without cover.
Per 1 No.
Labour digging & transporting surplus soil 0.500 day
excavation
@
650.00
325.00
250.000 Nos.
Bricks
@
7.20
1,800.00
0.170 Cu.m

40mm Metal

4,085.00

0.283 Cu.m

Sand

2,000.00

566.00

2.000 bag

Cement

749.00

1,498.00

1.000 day
2.000 day

Mason
Labour

@
@

1,000.00
650.00

1,000.00
1,300.00
7,183.45
1,005.68
8,189.13
8,189.00

Sub total
O.H. 14%
Total
Say per No.

R010 Manhole 1.050x0.675mm and 0.600mm to 1.200mm deep -do-doPer 1 No.


Labour digging & transporting surplus soil 1.000 day
excavation
500.000 Nos.
Bricks
0.283 Cu.m
40mm Metal
0.482 Cu.m
Sand
3.250 bag
Cement
1.500 day
Mason
3.000 day
Labour
Sub total
O.H. 14%
Total

694.45

-do-

@
@
@
@
@
@
@

650.00
7.20
4,085.00
2,000.00
749.00
1,000.00
650.00

Say per No.

650.00
3,600.00
1,156.06
964.00
2,434.25
1,500.00
1,950.00
12,254.31
1,715.60
13,969.91
13,969.00

R011 Manhole 1.050x0.675mm & 1.200mm to 1.800mm deep 225mm thick brick in cement 1:3 walls & cement
rendered 12mm (1:2) with 150mm cement conc. foundation 1:3:6(40) including forming channels, but without
cover.
Per 1 No.
Labour digging & transporting surplus soil 2.000 day
excavation
@
650.00
1,300.00
875.000 Nos.
Bricks
@
7.20
6,300.00
0.283 Cu.m
40mm Metal
@
4,085.00
1,156.06
0.737 Cu.m
Sand
@
2,000.00
1,474.00
4.500 bag
Cement
@
749.00
3,370.50
2.500 day
Mason
@
1,000.00
2,500.00
5.000 day
Labour
@
650.00
3,250.00
Sub total
19,350.56
O.H. 14%
2,709.08
Total
22,059.63

275544406.xls - DEPARTMENT OF BUILDINGS - R - Page No: 170 of 263

Say per No.

22,059.00

R012 Manhole cover reinforced 1:2:4(20)conc. 75mm thick 600x600mm approx. supplied and fixed reinforced 6mm
dia. M.S. at 75mm crs. both ways.
Per 1 No.
0.028
0.014
0.200
2.494

Cu.m
Cu.m
bag
kg.

0.500 hour
2.000 hour

Stone
Sand
Cement
Steel rods
Allow for binding wire & use of mould etc.
Smith
Mason & Mate
Sub total
O.H. 14%

@
@
@
@

4,085.00
2,000.00
749.00
100.00

@
@

1,000.00
206.25

Total

114.38
28.00
149.80
249.40
75.00
500.00
412.50
1,529.08
214.07
1,743.15
1,743.00

Say per No.

R013 Manhole cover reinforced 1:2:4(20)conc. 75mm thick 1050x675mm approx. supplied and fixed reinforced
6mm dia. M.S. at 75mm crs. both ways.
Per 1 No.
0.055
0.028
0.394
4.911

Cu.m
Cu.m
bag
kg.

1.000 hour
3.500 hour

Stone
Sand
Cement
Steel rods
Allow for binding wire & use of mould etc.
Smith
Mason & Mate
Sub total
O.H. 14%
Total

@
@
@
@

4,085.00
2,000.00
749.00
100.00

@
@

1,000.00
206.25

Say per No.

224.68
56.00
295.11
491.10
75.00
1,000.00
721.88
2,863.76
400.93
3,264.68
3,264.00

R014 Tees of junctions 110mm PVC supplied & fixed


Per 1 No.
1.000 No.
0.500 hour

Tee
Allow for solvane cement etc.
Plumber & Mate

1,354.00

206.25

Sub total
O.H. 14%
Total
Say per No.
R015 Wire domes for 110mm supplied & fixed.
Per 1 No.

275544406.xls - DEPARTMENT OF BUILDINGS - R - Page No: 171 of 263

1,354.00
50.00
103.13
1,507.13
211.00
1,718.12
1,718.00

1.000 No.
0.250 hour

Dome for 110mm pipe


Plumber

@
@
Sub total
O.H. 14%
Total
Say per No.

275544406.xls - DEPARTMENT OF BUILDINGS - R - Page No: 172 of 263

189.00
125.00

189.00
31.25
220.25
30.84
251.09
251.00

S - MISCELLANEOUS
S001 Fence barbed wire 12 1/2 gauge 4 points 75mm apart supplied & fixed on existing timber post with G.I.
Staples.
Per 30.48 L.m.
30.480 L.m.
1.000 Doz.
1.000 hour

Barbed wire
Staples
Fitter & Labour

@
@
@

16.00
185.00
206.25

Sub total
O.H. 14%
Total
Say per m.

S002 Fence barbed wire -doPer 30.48 L.m.

0.500 hour

-do- fixed on existing conc. Posts with available hooks bolts.

As in Item No:1
Less Staples
Add extra Labour in loosening & tightening
hook bolts.
Fitter & Labour
Sub total
O.H. 14%
Total

878.93
-185.00

Say per m.

S003 Fence barbed wire -doPer 30.48 L.m.

487.68
185.00
206.25
878.93
123.05
1,001.98
32.87
32.00

206.25

103.13
797.06
111.59
908.64
29.81
29.00

-do- fixed in renewing short lengths on timber post.

As in Item No:1
Add 25% on Labour
Sub total
O.H. 14%
Total
Say per m.

797.06
199.26
996.32
139.48
1,135.80
37.26
37.00

S004 -do-do- conc. Posts with available hooks bolts.


Per 30.48 L.m.
As in Item No:3
Less Staples
Add extra Labour in loosening & tightening
hook bolts as in Item No:2
Sub total
O.H. 14%
Total

275544406.xls - DEPARTMENT OF BUILDINGS - S - Page No: 173 of 263

996.32
-185.00
103.13
914.44
128.02
1,042.47
34.20

Say per m.

34.00

S005 Intermediate fence post or struts, cement conc. 1:2 1/2:3(19) reinforced with 4 Nos. 6mm dia. M.S. rods 1.70
L.m. high square section 100mm to 150mm fixed complete as per drawing No.68 of
Per Post
0.028
0.014
0.250
1.814
0.227
1.000
1.000
2.000

Cu.m.
Cu.m.
bag.
kg.
kg.
hour
hour
hour

1.000 hour

20mm Metal
Sand
Cement
6mm rods
BWG wire
Smith, cutting rods & tying wire
Mason cleaning moulds filling
Labour assisting Mason
Allow for Moulds
Fixing in ground Lab.

22-7-36

@
@
@
@
@
@
@
@

5,000.00
2,000.00
749.00
73.00
16.00
125.00
125.00
81.25

81.25

Sub total
O.H. 14%
Total
Say per Post.

140.00
28.00
187.25
132.42
3.63
125.00
125.00
162.50
75.00
81.25
1,060.05
148.41
1,208.46
1,208.00

S006 Intermediate fence post or struts, cement conc. 1:2 1/2:3(19) reinforced with 4 Nos. 6mm dia. M.S. rods 2.29
L.m. high square section 100mm to 150mm fixed complete as per drawing No.68 of
Per Post
0.035
0.018
0.340
2.268
0.340
1.000
1.000
2.000

Cu.m.
Cu.m.
bag.
kg.
kg.
hour
hour
hour

1.000 hour

20mm Metal
Sand
Cement
6mm rods
BWG wire
Smith, cutting rods & tying wire
Mason cleaning moulds filling
Labour assisting Mason
Allow for Moulds
Fixing in ground Lab.

22-7-36

@
@
@
@
@
@
@
@

5,000.00
2,000.00
749.00
73.00
16.00
125.00
125.00
81.25

81.25

Sub total
O.H. 14%
Total
Say per Post.

275544406.xls - DEPARTMENT OF BUILDINGS - S - Page No: 174 of 263

175.00
36.00
254.66
165.56
5.44
125.00
125.00
162.50
75.00
81.25
1,205.41
168.76
1,374.17
1,374.00

S007 End post and strut for type barbed wire fence fixed complete in cement conc. As per drawing BSR 6 of 1936
Per Post
0.198
0.092
0.170
1.750

Cu.m.
Cu.m.
Cu.m.
bag

40mm Metal
20mm Metal
Sand
Cement

@
@
@
@

4,085.00
5,000.00
2,000.00
749.00

808.83
460.00
340.00
1,310.75

16.254 kg.

M.S. Rods

111.00

1,804.19

0.454 kg.

BWG wire

190.00

86.26

3.000 hour
3.000 hour
6.000 hour

Black smith
Mason
Labour
Allow for moulds
Allow for curing
Excavation for foundation 1/3 labour laying conc.
Laying Conc. & Planting post.
Mason
Labour
Sub total
O.H. 14%
Total

@
@
@

125.00
125.00
81.25

81.25

375.00
375.00
487.50
75.00
50.00
27.06

@
@

125.00
81.25

0.333 hour
2.000 hour
4.000 hour

Say per Post.

250.00
325.00
6,774.59
948.44
7,723.03
7,723.00

S008 Fence barbed wire 5 strands, 12 1/2 BWG with 4 points at 75mm crs. & RCC posts 1:2:4(20), reinforced with
4 Nos. 6mm rods with No. 14 BWG stirrups at 200mm crs. posts to be fixed at 2.40m crs. In including
excavation cement conc. Foundation 1:3:6(40) metal to corner posts & struts & straining bolts all as per type
plan No:68, of 22.07.36 struts to be reinforced with 4 Nos. 10mm rods & conner posts with 4 Nos. 12mm rods.
Per 30.48 L.m. (with one conner post)

12.000
152.400
55.000
0.750
1.500
4.989
0.028
0.181
0.028
0.028
0.440

No.
m.
No.
day.
day.
kg.
Cu.m.
kg.
Cu.m.
Cu.m.
bag.

0.500 hour
1.000 hour
5.000 No.

End Post & strut as in Item No: 7


Intermediate Post -doBarbed wire
G.I. Hook bolts
Fitter
Labour
Add for 1 struts
Steel
20mm metal
Wire
40mm metal
Sand
Cement
Labour moulds as in Item No: 6
Conc foundation : Mason
Labour
Straining bolts

@
@
@
@
@

1,374.00
16.00
12.60
1,000.00
650.00

6,774.59
16,488.00
2,438.40
693.00
750.00
975.00

@
@
@
@
@

111.00
5,000.00
190.00
4,085.00
2,000.00

553.78
140.00
34.39
114.38
56.00

@
@
@

125.00
81.25
168.00

Sub total
O.H. 14%
Total
275544406.xls - DEPARTMENT OF BUILDINGS - S - Page No: 175 of 263

412.50
62.50
81.25
840.00
30,413.79
4,257.93
34,671.72

1,137.52
1,137.00

Say per m.

S009 Straining bolts, 12mm dia made & fixed 0.45 L.m. long (approx.)
Per No.
0.544 kg.
1.000 No.
2.000 hours.

12mm rods
12mm Nut & washers
Black smith & Bellowed boys
Allow for coat etc.

@
@
@

111.00
30.00
206.25

60.38
30.00
412.50
50.00
552.88
77.40
630.29
630.00

81.25

975.00
975.00
136.50
1,111.50
1,111.00

81.25

1,300.00
1,300.00
182.00
1,482.00
1,482.00

Sub total
O.H. 14%
Total
Say per m.

S010 Well bailing out water 1.5 to 2.3 dia. Up to 6.10 m depth including cleaning wall.
Per 1.5 m depth of water.
12.000 hours.

Labours

@
Sub total
O.H. 14%
Total
Say per Item

S011 -do- -do- 6.40 m 9.15 m depth -doPer 1.5 m depth of water.
16.000 hour

Labours

@
Sub total
O.H. 14%
Total
Say per Item

275544406.xls - DEPARTMENT OF BUILDINGS - S - Page No: 176 of 263

T - ALUMINIUM WORKS
T001 Labour Distribution for Aluminium works
Size 10 Sq.ft.
0.750 Day
1.000 Day

Sp. Skilled Labour


Un Skilled Labour

@
@

1,000.00
600.00

750.00
600.00
1,350.00
135.00
1,453.00

@
@
@
@
@
@
@
@
@
@

121.00
100.00
100.00
85.00
85.00
85.00
63.00
89.00
55.00
27.00

4,791.60
880.00
2,750.00
2,720.00
4,488.00
4,488.00
2,217.60
3,132.80
968.00
534.60

Vertical Frame
70S-1704-A
Mild Frame
80S-1801
Bottom Horri.
70S-1503-A
Top Horri.
70S-1402-1
Top Rail
70S-1002-1
Bottom Rail
70S-1102-1
Lock Vertical Rail
70S-1202-1
6mm Ply wood sheet
5mm Tinted Glass
Formica Sheet
Lock Alfa
Allow for rubber gasscut rever brass screws
Silicone sealant etc. 10%

@
@
@
@
@
@
@
@
@
@
@

139.00
74.67
134.00
98.00
105.00
77.00
77.00
85.00
85.00
78.00
1,300.00

2,140.60
246.41
442.20
323.40
808.50
592.90
592.90
841.50
1,122.00
1,544.40
1,300.00

Labour

Per 10. Sq.ft


Per Sq.ft.
Per Sq.m.

T002 Aluminium Partition


Size 11' - 0" x 7' - 0" = 77 S.ft
39.600
8.800
27.500
32.000
52.800
52.800
35.200
35.200
17.600
19.800
15.400
3.300
3.300
3.300
7.700
7.700
7.700
9.900
13.200
19.800
1.000

L.ft
L.ft
L.ft
Sq.ft
Sq.ft
Sq.ft
L.ft
L.ft
L.ft
L.ft
Door
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Sq.ft
Sq.ft
Sq.ft
No

77.000 Sq.ft

Main Frame
Mild Frame
2" x 1" Box iron
5mm Tinted Glass
6mm Ply wood
Formica Sheet
Glass Beading
Glass Beading
Bottom Beading
M-Channel Beading

70S-3002-1
PT-5157
P-1113
(Marin)
100D - 1917
100D - 1914
PT - 5154
PT - 5153

3,692.54

Sub total
O.H. 14%
Per 77 Sq.ft
Per Sq,ft
Per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 177 of 263

135.00

10,395.00
51,012.95
7,141.81
58,154.77
755.26
8,129.00

T003 Aluminium Casement with Project


Size 4' - 0" x 5' - 6" = 22.5 S.ft
20.900
10.450
41.800
41.800
24.200

L.ft
L.ft
L.ft
L.ft
Sq.ft

22.000 Sq.ft

Side Frame
CA-1001
@
Mild Frame
CA-1002
@
Sash Frame
CA-2001-A
@
Beading
100D-1914
@
5mm Tinted Glass
@
Allow for rubber gasscut rever brass screws
Silicone sealant etc. 10%
Labour
@
Sub total
O.H. 14%
Per 22.5 Sq.ft
Per Sq.ft
Per Sq.m.

183.00
288.00
166.00
89.00
85.00

140.00

3,824.70
3,009.60
6,938.80
3,720.20
2,057.00
1,955.03
3,080.00
24,585.33
3,441.95
28,027.28
1,245.66
13,408.00

T004 Aluminium Door Frame Only


Size 7' - 0" x 3' - 0" = 21.5 S.ft
18.700 L.ft
11.000 L.ft
0.750 Day
0.750 Day

Side Frame
70S-3002-1
Beading
70D - 1910
Allow for Revert 10%
Sp. Skilled Labour
Unskilled Labour

@
@

173.00
44.00

@
@

1,000.00
600.00

Sub total
O.H. 14%
Per 21.5 Sq.ft
Per Sq.ft
Per Sq.m.

3,235.10
484.00
371.91
750.00
450.00
5,291.01
740.74
6,031.75
280.55
3,019.00

T005 -do- with ply wood door


Size 7' - 0" x 3' - 0" = 21.5 S.ft

1.00 No.
0.250 Day

Aluminium frame as per above


Ply wood door
Allow for Hinges
Carpenter
Sub total
O.H. 14%

5,291.01
4,330.00
500.00
212.50
10,333.51
1,446.69

Per 21.5 Sq.ft

11,780.20

Per Sq.ft
Per Sq.m.

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 178 of 263

850.00

547.92
5,897.00

T006 Aluminium Door fully glazed double hung.


Size 6' - 6" x 5' - 0" = 32.5 S.ft
14.300
14.300
5.500
5.500
5.500
50.600
1.000
2.000
2.000
35.750
19.800
19.800

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
No
Pair
No.
Sq.ft
L.ft
L.ft

32.500 Sq.ft

Side vertical member 100D 3502


Vertical Lock member 100D - 3503-A
Bottom rail member 100D - 3207
Top rail member
100D - 3203
Mid lock rail
100D - 3004-A
Beading
100D - 1914
Lock
Handle
Door Closer
5mm Glass
Door Frame
70S-3002-1
Beading
70D-1910
Allow 10%
Labour

@
@
@
@
@
@
@
@
@
@
@
@

168.03
194.00
297.00
225.00
212.00
43.00
1,300.00
600.00
2,875.00
85.00
173.00
43.00

2,402.83
2,774.20
1,633.50
1,237.50
1,166.00
2,175.80
1,300.00
1,200.00
5,750.00
3,038.75
3,425.40
851.40
2,695.54
4,550.00
34,200.92
4,788.13
38,989.05
1,199.66
12,913.00

@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

140.00

Side vertical member (sash) 100D 3502


@
Vertical Lock member 100D - 3503-A
@
Bottom rail
100D - 3207
@
Top rail
100D - 3203
@
Mid lock rail
100D - 3004-A
@
Beading
100D - 1914
@
Lock (alpha)
@
Handle
@
Door Closer
@
5mm Tinted Glass
@
6mm Ply wood
@
Formica
@
Door Frame
70S-3002@
Beading
70D-1910
@
Allow for rivets, gasscut , rubber brass screws
Door hinges silicone tie rods ets. (10%)
Labour
@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

241.00
194.00
297.00
225.00
212.00
42.00
1,300.00
600.00
2,875.00
85.00
273.00

3,446.30
2,774.20
1,633.50
1,237.50
1,166.00
2,125.20
1,300.00
1,200.00
5,750.00
1,636.25
4,504.50

152.00
43.00

3,009.60
851.40

T007 Aluminium double hung Door with panneled and glazed.


Size 6' - 6" x 5' - 0" = 32.5 S.ft
14.300
14.300
5.500
5.500
5.500
50.600
1.000
2.000
2.000
19.250
16.500
33.000
19.800
19.800

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
No
Pair
No.
Sq.ft
Sq.ft
Sq.ft
L.ft
L.ft

32.500 Sq.ft

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 179 of 263

140.00

3,063.45
4,550.00
38,247.90
5,354.71
43,602.60
1,341.62
14,441.00

T008 Aluminium single hung Door with fully glazed.


Size 6' - 6" x 3' - 3" = 21.12S.ft
7.150
7.150
3.570
3.570
3.570
28.600
1.000
1.000
1.000
23.240
18.870
17.870

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
No
Pair
No.
Sq.ft
L.ft
L.ft

21.120 Sq.ft

Side vertical member (sash) 100D 3502


@
Vertical Lock member 100D - 3503-A
@
Bottom rail
100D - 3207
@
Top rail
100D - 3203
@
Mid lock rail
100D - 3004-A
@
Beading
100D - 1914
@
Lock (alpha)
@
Handle
@
Door Closer
@
5mm Tinted Glass
@
Door Frame
70S-3002-I
@
Beading
70D-1910
@
Allow for rivets, gasscut , rubber brass screws
Door hinges silicone tie rods ets. (10%)
Labour
@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

241.00
194.00
297.00
225.00
212.00
42.00
1,300.00
600.00
2,875.00
85.00
152.00
43.00

140.00

1,723.15
1,387.10
1,060.29
803.25
756.84
1,201.20
1,300.00
600.00
2,875.00
1,975.40
2,868.24
768.41
1,731.89
2,956.80
22,007.57
3,081.06
25,088.63
1,187.91
12,786.00

T009 Aluminium single hung Door with panneled and glazed.


Size 6' - 6" x 3' - 3" = 21.12 S.ft
7.150
7.150
3.570
3.570
3.570
28.060
1.000
1.000
1.000
12.510
10.720
21.450
17.870
17.870

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
No
Pair
No.
Sq.ft
Sq.ft
Sq.ft
L.ft
L.ft

21.120 Sq.ft

Side vertical member (sash) 100D 3502


Vertical Lock member 100D - 3503
Bottom rail
100D - 3207
Top rail
100D - 3203
Mild lock rail
100D - 3202
Beading
100D - 1914
Lock (alpha)
Handle
Door Closer
5mm Tinted Glass
6mm Ply wood / Al gladding
Formica
Door Frame
70S-3002Beading
70D-1910
Allow for rivets, gasscut , rubber brass screws
Door hinges silicone tie rods ets. (10%)
Labour

@
@
@
@
@
@
@
@
@
@
@
@
@
@

231.00
200.00
285.00
215.00
210.00
43.00
1,300.00
600.00
2,825.00
85.00
273.00

1,651.65
1,430.00
1,017.45
767.55
749.70
1,206.58
1,300.00
600.00
2,825.00
1,063.35
2,926.56

145.00
43.00

2,591.15
768.41

135.00

1,889.74
2,851.20

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 180 of 263

Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

23,638.34
3,309.37
26,947.71
1,275.93
13,734.00

T010 Aluminium double Door with top louvers and 10 - 15 microns new extrusion
4' - 5" x 8' - 0" = 35.33 Sq.ft
27.850
15.030
15.030
3.750
3.750
3.750
40.620
19.980
26.400
12.800
2.000
1.000
1.000
16.800
18.530

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Pair
No
No.
Sq.ft
Sq.ft

35.300 Sq.ft

100D - 3004
100D - 102
100D - 101
100D - 201
100D - 301
100D - 401
100D - 501
70D - 1910
DG - 02
DG - 102
Handle
Lock (alpha)
Hyd. Closer
5mm Tinted Glass
Al Gladding
Allow for other fittings. (10%)
Labour

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

222.00
282.00
268.00
259.00
308.00
341.00
38.00
43.00
70.00
60.00
600.00
1,300.00
2,875.00
85.00
273.00

140.00

Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

6,182.70
4,238.46
4,028.04
971.25
1,155.00
1,278.75
1,543.56
859.14
1,848.00
768.00
1,200.00
1,300.00
2,875.00
1,428.00
5,058.69
3,473.46
4,942.00
43,150.05
6,041.01
49,191.06
1,392.33
14,987.00

T011 Aluminium single hung Door and 10 - 15 microns new extrusion. Without louvers
3' - 0" x 7' - 0" = 21.00 Sq.ft
18.400
2.560
2.560
2.560
7.510
7.510
10.300
17.600
1.000
1.000
1.000
10.600

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Pair
No
No.
Sq.ft

100D - 3004
100D - 201
100D - 301
100D - 401
100D - 101
100D - 102
100D - 501
70D - 1910
Handle
Lock (alpha)
Hyd. Closer
5mm Tinted Glass

@
@
@
@
@
@
@
@
@
@
@
@

210.00
259.00
308.00
341.00
368.00
382.00
38.00
43.00
600.00
1,300.00
2,875.00
85.00

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 181 of 263

3,864.00
663.04
788.48
872.96
2,763.68
2,868.82
391.40
756.80
600.00
1,300.00
2,875.00
901.00

8.000 Sq.ft
21.000 Sq.ft

Al Gladding
Allow for other fittings. (10%)
Labour

273.00

@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

140.00

2,184.00
2,082.92
2,940.00
25,852.10
3,619.29
29,471.39
1,403.40
15,106.00

T012 Aluminium single hung Door with top louvers and 10 - 15 microns new extrusion.
3' - 0" x 8' - 0" = 24.00 Sq.ft
23.700
2.560
2.560
2.560
7.510
7.510
10.300
17.600
17.600
7.880
1.000
1.000
1.000
10.600
8.000

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Pair
No
No.
Sq.ft
Sq.ft

24.000 Sq.ft

100D - 3004
100D - 201
100D - 301
100D - 401
100D - 101
100D - 102
100D - 501
70D - 1910
DG - 02
DG - 102
Handle
Lock (alpha)
Hyd. Closer
5mm Tinted Glass
Al Gladding
Allow for other fittings. (10%)
Labour

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

210.00
259.00
308.00
341.00
268.00
282.00
38.00
43.00
73.00
66.00
600.00
1,300.00
2,875.00
273.00
237.50

135.00

Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

4,977.00
663.04
788.48
872.96
2,012.68
2,117.82
391.40
756.80
1,284.80
520.08
600.00
1,300.00
2,875.00
2,893.80
1,900.00
2,395.39
3,240.00
29,589.25
4,142.49
33,731.74
1,405.49
15,129.00

T013 60mm casement window with top louvers and 10 - 15 microns extrusion.
4' - 0" x 5' - 6" = 22.00 Sq.ft
20.900
25.280
12.780
27.830
10.180
19.530
2.000
2.000

L.ft
L.ft
L.ft
L.ft
L.ft
Sq.ft
Pairs
Nos.

CA - 1003
DG - 02
DG - 102
CA - 2006
CA - 1004
5mm Tinted Glass
Bar Hinges
Casement lock
Allow for other fittings. (10%)

@
@
@
@
@
@
@
@

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 182 of 263

109.00
70.00
60.00
150.00
260.00
85.00
565.00
115.00

2,278.10
1,769.60
766.80
4,174.50
2,646.80
1,660.05
1,130.00
230.00
1,465.59

22.000 Sq.ft

Labour

@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

140.00

3,080.00
19,201.44
2,688.20
21,889.64
994.98
10,710.00

@
@
@
@
@
@
@
@

109.00
73.00
66.00
150.00
260.00
85.00
588.00
121.00

@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

140.00

1,199.00
881.84
405.24
1,320.00
572.00
391.00
588.00
121.00
547.81
840.00
6,865.89
961.22
7,827.11
1,304.52
14,042.00

T014 60mm Fanlight with top louvers and 10 - 15 microns extrusion.


2' - 0" x 3' - 6" = 6.00 Sq.ft
11.000
12.080
6.140
8.800
2.200
4.600
1.000
1.000

L.ft
L.ft
L.ft
L.ft
L.ft
Sq.ft
Pairs
Nos.

6.000 Sq.ft

CA - 1003
DG - 02
DG - 102
CA - 2006
CA - 1004
5mm Tinted Glass
Bar Hinges
Casement lock
Allow for other fittings. (10%)
Labour

T015 70mm Sliding windows with top louvers and 10 - 15 microns extrusion.
Size 22 Sq.ft
4.330
12.100
8.530
8.530
4.170
4.170
4.330
1.550
1.550
24.800
14.500
4.330
1.550
17.600

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Sq.ft

22.000 Sq.ft

70S - 1101 - 1
70S - 1201 - 1
70S - 1704
70S - 1604
70S - 1503A
70S - 1401 - 1
70SF - 1006
70SF - 1201A
70SF - 1201B
DG - 02
DG - 102
CA - 1001
CA - 1002
Glass
Allow for other fittings. (10%)
Labour

@
@
@
@
@
@
@
@
@
@
@
@
@
@

146.00
122.00
105.00
119.00
134.00
103.00
236.00
82.00
82.00
70.00
60.00
175.00
275.00
85.00

140.00

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 183 of 263

632.18
1,476.20
895.65
1,015.07
558.78
429.51
1,021.88
127.10
127.10
1,736.00
870.00
757.75
426.25
1,496.00
1,156.95
3,080.00

Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

15,806.42
2,212.90
18,019.32
819.06
8,816.00

T016 Aluminium Fully glazed double Door with top louvers and 10 - 15 microns new extrusion with floor hinges
(Japan) , stainless steel 12" handles and horrizoantal sticker approved by Engineer on glass.
Per 4' - 5" x 8' - 0" = 35.33 Sq.ft
27.850
15.030
15.030
3.750
3.750
3.750
40.620
19.980
26.400
12.800
2.000
1.000
2.000
40.700
40.000

L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
L.ft
Pair
No
No.
Sq.ft
Sq.ft

35.330 Sq.ft

100D - 3004
100D - 102
100D - 101
100D - 201
100D - 301
100D - 401
100D - 501
70D - 1910
DG - 02
DG - 102
Stainless steel Handle
Lock (alpha)
Door hinges
5mm Tinted Glass
Placing sticker
Allow for other fittings. (10%)
Labour

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

210.00
282.00
268.00
259.00
308.00
341.00
38.00
43.00
70.00
60.00
5,000.00
1,300.00
10,150.00
85.00
250.00

@
Sub total
O.H. 14%
Per 32.5 Sq.ft
Per Sq.ft.
Per Sq.m.

140.00

275544406.xls - DEPARTMENT OF BUILDINGS - T - Page No: 184 of 263

5,848.50
4,238.46
4,028.04
971.25
1,155.00
1,278.75
1,543.56
859.14
1,848.00
768.00
10,000.00
1,300.00
20,300.00
3,459.50
10,000.00
6,759.82
4,946.20
79,304.22
11,102.59
90,406.81
2,558.92
27,544.00

RATE ANALYSIS 1ST HALF OF 2008 IN ELECTRICAL.


No
1

Qty

Unit

Code

Description

Rate

Rate

Main switch (3 phase, 30 amp.).


1

No

Main switch 30 amp.

5,500.00

5,500.00

15

11

7/.044 single core wire,

86.84

1,302.60

No

Board

90.00

90.00

Nos.

Screws 2"x10

5.00

10.00

Nos.

10

Screws 1"x6

3.00

6.00

Meter

41

Conduit pipe 1"

15.00

30.00

1/2

day

Electrician

1,050.00

525.00

7,463.60

Over heads

1,044.90

Per No

8,508.50

Say Rs

8,509.00

Main switch (60 Amp, 3 phase).


1

No

Main switch 60 Amp English

10,400.00

10,400.00

10

13

7/0.064 Single core wire

80.00

800.00

No

Board

90.00

90.00

Nos.

Screws 2"x10

5.00

10.00

Nos.

10

Screws 1"x6

3.00

6.00

Meter

41

Conduit pipe

15.00

30.00

1/2

day

Electrician labourer

1,050.00

525.00

Over heads

Amount

11,861.00
1,660.54

Per No

13,521.54

Say Rs

13,522.00

Earth pipe 2" dia 5' - 0" long.


15

16

Earth wire 7/0.029

No

Earth pipe 2" Dia 5' - 0" long

1/4

day

Electrician labourer

23.55

353.25

780.00

780.00

1,050.00

262.50

Over heads

1,395.75
195.41

Per No

1,591.16

Say Rs

1,591.00

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 185 of 263

Main switch single phase 30 Amp.


1

No

Main switch 30 Amp English

1,000.00

1,000.00

Meter

11

7/0.044 wire

86.84

434.20

Nos.

Board

90.00

90.00

Nos.

Screws 2"x10

5.00

10.00

Nos.

10

Screws 1"x6

3.00

6.00

Meter

41

Conduit pipe

15.00

30.00

1/4

day

Electrician Emate

1,050.00

262.50

Over heads

1,832.70
256.58

Per No

2,089.28

Say Rs

2,089.00

15 Amp. Plug.
1

No

Plug with switch (clipsal)

10

Metre

14

3/.036 wire, 25 meters

No

18

Screws (1 1/2"x6), brass

No

21

Sunk box

No

20

Screws Brass 1 1/2"x10" brass

15

16

Allow

285.00

285.00

40.00

400.00

5.00

10.00

25.00

25.00

6.00

12.00

Earth wire 7/.029

23.55

353.25

Wiring clips and panel pins

10.00

10.00

15.00

30.00

1,050.00

262.50

41

Conduit pipe

1/4

Day

Electrician Emate
Over heads

1,387.75
194.29

Per No

1,582.04

Say Rs

1,582.00

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 186 of 263

Light Fitting.
1

No

22

Round plug

10.00

10.00

No

23

Ceiling rose

20.00

20.00

No

24

Holder

20.00

20.00

17

Flexible wire

25.00

25.00

No

10

Screw 1" x 6

3.00

6.00

No

18

Screw 1 1/2" x 6

5.00

5.00

No

25

Switch clipsal

75.00

75.00

No

21

Sunk box

25.00

25.00

No

20

Brass screw 1 1/2" x 10

6.00

6.00

20

15

1/.044 wire

9.20

184.00

41

Conduit pipe

15.00

30.00

Wiring clips & pannel pins

10.00

10.00

1,050.00

262.50

Allow
1/4

Day

Electrician Emate
Over heads

94.99

Per No

773.49

Say Rs

773.00

5 Amp. Plug.
1

No

Plug with switch (Clipsal)

225.00

225.00

Nos.

18

Brass screws (1 1/2"x6)

5.00

10.00

No

21

Sunk box

25.00

25.00

Nos.

20

Brass screws (1 1/2"x10)

6.00

12.00

10

15

1/.044 wire

9.20

92.00

10

16

Earth wire 7/.029

23.55

235.50

Wiring clips & panel pins

10.00

10.00

15.00

30.00

1,050.00

262.50

Allow
2

41

Conduit pipe

1/4

Day

Electrician
Over heads

678.50

902.00
126.28

Per No

1,028.28

Say Rs

1,028.00

Ceiling Fan (USHA).


1

No

28

Ceiling fan 56"

No

42

Hooks

No

1/2

Day

Light point Item 6


3

Electrician

2,900.00

2,900.00

80.00

80.00

678.50

678.50

1,050.00

525.00

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 187 of 263

4,183.50

Over heads

585.69

Per No

4,769.19

Say Rs

4,769.00

Ceiling Fan ( KDK ).


1

No

29

Ceiling fan 56"

No

42

Hooks

No

1/2

Day

Light point Item 6


3

Electrician Emate

3,600.00

3,600.00

80.00

80.00

678.50

678.50

1,050.00

525.00

Over heads

10

683.69

Per No

5,567.19

Say Rs

5,567.00

Ceiling Fan ( Bajaj ).


1

No

30

Ceiling fan 56"

No

42

Hooks

No

1/2

Day

Light point Item 6


3

Electrician Emate

4,200.00

4,200.00

80.00

80.00

678.50

678.50

1,050.00

525.00

Over heads

11

5,483.50
767.69

Per No

6,251.19

Say Rs

6,251.00

Calling Bell.
1

No

26

Bell

375.00

375.00

No

27

Bell bush - Clipsal

225.00

225.00

No

22

Round block

10.00

10.00

Nos.

18

Brass screws 1 1/2" x 6

5.00

15.00

No

21

Sunk box

25.00

25.00

20

15

1/.044 wire

9.20

184.00

41

Conduit pipe

15.00

30.00

Wiring clips & panel pins

10.00

10.00

1,050.00

262.50

Allow
1/4

Day

Electrician Emate
Over heads

12

4,883.50

1,136.50
159.11

Per No

1,295.61

Say Rs

1,296.00

ABC box 500 Type.


5

12

7/.044 wire Twin wire

116.65

583.25

41

Conduit pipe

15.00

30.00

Nos.

Screws 2"x10

5.00

10.00

Nos.

19

Screws 1 1/4"x6

6.00

12.00

No

31

ABC box 500 type

980.00

980.00

No

90.00

90.00

Board 10"x10"

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 188 of 263

1/4

Day

Electrician Emate

1,050.00

262.50

Over heads

13

275.49

Per No

2,243.24

Say Rs

2,243.00

ABC Box 700 type.


1

No

As per Item 12

1,967.75

No

31

Less 500 type

980.00

987.75

No

32

Add 700 type

1,250.00

1,250.00

14% Over Heads

14

Per No

2,551.04

Say Rs

2,551.00

ABC Box 900 type.


1

No

As per Item 12

1,967.75

No

31

Less 500 type

980.00

987.75

No

33

Add 900 type

1,440.00

1,440.00

2,427.75
339.89

Per No

2,767.64

Say Rs

2,768.00

Trip switch (Single phase).


1

No

34

Trip switch crab tree 30Amp

2,800.00

2,800.00

No

Board

90.00

90.00

Nos.

Brass Screws 2"x10

5.00

10.00

Nos.

19

Brass Screws 1 1/4"x6

6.00

12.00

41

Conduit

15.00

30.00

1/4

Day

Electrician Emate

1,050.00

262.50

Over heads

16

2,237.75
313.29

14% Over Heads

15

1,967.75

3,204.50
448.63

Per No

3,653.13

Say Rs

3,653.00

Pendent lamp / Battern lamp.


1

No

No

Light point Item 6


35

Bulb & Shade

678.50

678.50

35.00

35.00

Over heads
Per No
275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 189 of 263

713.50
99.89
813.39

Say Rs

17

813.00

Water light lamp.


1

No

No

36

Light point Item 6

678.50

678.50

Water tight lamp with shade

950.00

950.00

Over heads

18

227.99

Per No

1,856.49

Say Rs

1,856.00

Flourscent lamp 4'-0".


1

No

No

37

Light point Item 6

678.50

678.50

4'-0" Flourscent set

530.00

530.00

Over heads

19

Per No

1,377.69

Say Rs

1,378.00

Flourscent Lamp 2'-0".


1

No

No

38

Light point Item 6

678.50

678.50

Flourscent set

460.00

460.00

1,138.50
159.39

Per No

1,297.89

Say Rs

1,298.00

Hood lamp.
1

No

No

39

Light point Item 6

678.50

678.50

Hood lamp

950.00

950.00

Over heads

21

1,208.50
169.19

Over heads

20

1,628.50

1,628.50
227.99

Per No

1,856.49

Say Rs

1,856.00

Wall bracket lamp.


1

No

No

40

Light point Item 6

678.50

678.50

Bracket lamp

650.00

650.00

Over heads
275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 190 of 263

1,328.50
185.99

22

Per No

1,514.49

Say Rs

1,514.00

Isolator - 2 Pole
1
1
1/2

No
M
Day

43
12
3

Isolator - 32 Amp
7/.044 Twin wire
Electrician
Over heads
Per No

1,100.00
116.65
1,050.00

1,100.00
116.65
525.00

Say Rs
23

1,985.00

Service bracket 5' Long


5
1/2
5

L.ft
Kg
M

44
45
41

1/2

Day

Angle Iron 2 1/2" x 2 1/2" x 1/4"


Bolt & Nut with washers
1" Conduit Pipe
Allow for welding charges
Electrician
Allow for Cement
Over heads
Per No

80.00
200.00
15.00
1,050.00

400.00
100.00
75.00
75.00
525.00
50.00

Say Rs
24

1,741.65
243.83
1,985.48

1,225.00
171.50
1,396.50
1,397.00

ABC box 700 Type.


5

12

7/.044 wire Twin wire

106.00

530.00

41

Conduit pipe

11.25

22.50

Nos.

Screws 2"x10

5.00

10.00

Nos.

19

Screws 1 1/4"x6

3.00

6.00

No

ABC box 700 type

700.00

700.00

Main switch 30Amp

200.00

200.00

Trip switch 30Amp

950.00

950.00

Breakers

90.00

720.00

90.00

90.00

950.00

237.50

No

Board 10"x10"

1/4

Day

Electrician Emate
Over heads

3,466.00
485.24

Per No

3,951.24

Say Rs

3,951.00

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 191 of 263

25

ABC box 500 Type.


5

12

7/.044 wire Twin wire

106.00

530.00

2
2
2
1
1
1
6
1
1/4

M
Nos.
Nos.
No

41
9
19

No
Day

1
3

Conduit pipe
Screws 2"x10
Screws 1 1/4"x6
ABC box 500 type
Main switch 30Amp
Trip switch 30Amp
Breakers
Board 10"x10"
Electrician Emate
Over heads
Per No

11.25
5.00
3.00
700.00
200.00
950.00
90.00
90.00
950.00

22.50
10.00
6.00
700.00
200.00
950.00
540.00
90.00
237.50

Say Rs
26

3,286.00
460.04
3,746.04
3,746.00

ABC box900 Type.


5
2
2
2
1
1
1
10
1
1/4

M
M
Nos.
Nos.
No

12
41
9
19

No
Day

1
3

7/.044 wire Twin wire


Conduit pipe
Screws 2"x10
Screws 1 1/4"x6
ABC box
Main switch 30Amp
Trip switch 30Amp
Breakers
Board 10"x10"
Electrician Emate
Over heads
Per No

106.00
11.25
5.00
3.00
700.00
200.00
950.00
90.00
90.00
950.00

Say Rs

275544406.xls - DEPARTMENT OF BUILDINGS - U - Page No: 192 of 263

530.00
22.50
10.00
6.00
700.00
200.00
950.00
900.00
90.00
237.50

3,646.00
510.44
4,156.44
4,156.00

DEPARTMENT OF BUILDINGS, BATTICALOA


SUMMARY OF BUILDING SCIEDULE OF RATE - 1st HALF 2009
A - DEMOLISHER
A001

Brick work in cement, demolished bricks stacked and debris cleared.

Cu.m

714.00

A002

Brick work in lime, demolished bricks stacked and debris cleared.

Cu.m

583.00

A003

Cabook masonry, in lime mortar demolished cabook stacked and debris cleared.

Cu.m

518.00

A004

Rubble masonry in cement, demolished, rubble staked and debris cleared.

Cu.m

654.00

A005

Rubble masonry in lime, demolished, rubble staked and debris cleared.

Cu.m

523.00

A006

Cement concrete in floor slab (150mm) demolished, and debris cleared away.
(unreinforced)

Sq.m

358.00

Cement concrete in floor slab (75mm) demolished, and debris cleared away.
(unreinforced)

Sq.m

179.00

Cement concrete, reinforced, demolished


reinforcement removed and debris cleared.

Sq.m

518.00

L.m

79.00

A007

A008

in

suspended

floors

100mm,

A009

Drains brick demolished and debris cleared.

A010

Floors brick paved, demolished and debris cleared away. (75mm thick floor).

Sq.m

59.00

A011

Rendering, cement, chipped and debris cleared away from brick walls and floors.

Sq.m

92.00

A012

Rendering, cement, chipped and debris cleared away from cement concrete walls
and floors.

Sq.m

134.00

A013

Lime plastering chipped and debris cleared away.

Sq.m

36.00

A014

Cement plastering, chipped and debris cleared away.

Sq.m

108.10

A015

Cement plastering, soffit chipped and debris cleared away.

Sq.m

130.00

A016

Tiles, glazed demolished and debris cleared.

Sq.m

159.00

A017

Water proof treatment of bitumen taken off from flat roof and debris cleared away.

Sq.m

159.00

A018

Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls
of single storey building and stacked.

Sq.m

78.90

Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls
of two storey building and stacked.

Sq.m

96.20

Corrugated sheets, iron, asbestos or aluminium alloy removed from roofs or walls
of three storey building and stacked.

Sq.m

108.50

Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and


timber,stacking serviceable material and clearing debris in single storey buildings.

Sq.m

112.00

A019

A020

A021

A022

Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and


timber,stacking serviceable material and clearing debris in two storey buildings.
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 193 of 263

Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and


timber,stacking serviceable material and clearing debris in two storey buildings.

Sq.m

141.00

Roof, removing Corrugated sheets, iron, asbestos or aluminium alloy and


timber,stacking serviceable material and clearing debris in three storey buildings.

Sq.m

173.00

Roof, removing tiles and timber, stacking serviceable material and clearing debris
in single storeyed buildings

Sq.m

116.00

Roof, removing tiles and timber, stacking serviceable material and clearing debris
in two storeyed buildings

Sq.m

180.00

Roof, removing tiles and timber, stacking serviceable material and clearing debris
in three storeyed buildings

Sq.m

233.00

A027

Tiles Calicut or half round, removed from roof of single storey buildings and
stacked at site.

Sq.m

46.00

A028

Tiles Calicut or half round, removed from roof of two storey buildings and stacked
at site.

Sq.m

81.90

A029

Tiles Calicut or half round, removed from roof of three storey buildings and
stacked at site.

Sq.m

122.70

A030

Ceiling, existing, removed materials stacked and debris cleared.

Sq.m

75.00

A031

Ceiling asbestos removing including timber frame work, stacking serviceable


materials and debris cleared away in single storeyed building.

Sq.m

224.00

Ceiling asbestos removing including timber frame work, stacking serviceable


materials and debris cleared away in two storeyed building.

Sq.m

264.00

Valance / barge boarding removed, materials stacked and debris cleared away in
single storeyed building.

L.m

32.00

Valance / barge boarding removed, materials stacked and debris cleared away in
two storeyed building.

L.m

46.10

No.

741.00

A023

A024

A025

A026

A032

A033

A034

A035

Door or window, size up to 3.7 sq.m removed from existing walls and stacked.

A036

Door or window, size over 3.7 sq.m removed from existing walls and stacked.

No.

1,111.00

A037

Door or window, sash only, size up to 3.7 sq.m removed from existing walls and
stacked.

No.

117.00

A038

Door or window, sash only, size over 3.7 sq.m removed from existing walls and
stacked.

No.

176.00

A039

Glass panes in door, window and fanlights removed and stacked.

Sq.m

383.00

A040

Partitions removed and stacking at site, including making good to walls and floors.

Sq.m

321.00

A041

Expanded metal removed from existing frames and stacked.

Sq.m

281.00

A042

Down pipes, 100mm to 150mm dia G.I. old or decayed, removed from existing
building and stacked.

L.m

25.30

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 194 of 263

A043

Gutter, eaves, removed and stacked from roof of single storeyed building.

L.m

32.00

A044

Gutter, eaves, removed and stacked from roof of two storeyed building.

L.m

46.10

A045

Gutter, eaves, removed and stacked from roof of three storeyed building.

L.m

63.10

A046

Gate sash removed and stacked after demolishing cement concrete blocks or
removing posts and separating pintles. ( Demolishing brick work where ncessary
paid for separately)

No.

741.00

Fence uprooted, barbed wire rolled up and all materials stacked (length of the
fencing to be measured).

L.m

18.20

A047

A048

Cadjan roofing or walling dismantled, timber stacked and debris cleared.

Sq.m

17.60

A049

Cutting down trees girth not exceeding 600mm, grubling up roots & fill in
excavation

No.

463.00

A050

Cutting down trees uprooting and grubbling girth exceeding 600mm but less than
900mm excavation filled in earth logging and stacking.

No.

648.00

Cutting down trees uprooting and grubbing girth exceeding 900mm but less than
1200mm excavation filled in earth, logging and stacking.

No.

1,482.00

Cutting down trees, uprooting and grubbing girth exceeding 1200mm excavation
filled in earth, rate to include logging and stacking.

No.

1,852.00

A051

A052

B - EXCAVATOR
B001

B002

B003

B004

B005

B006

B007

B008

Drains, earth, in any soil except rock requiring blasting cut to gradient and shaped
as directed, soil deposited within site.

Cu.m

376.00

Excavation for foundation in any material except rock requiring blasting part return
fill in and ram and surplus disposed within the site as directed.

Cu.m

441.00

Excavation for Well or Pit upto 1.5 m from ground level in any material except
rock requiring blasting part return fill in and ram and surplus disposed within the
site as directed.

Cu.m

400.00

Excavation for Well or Pit, from 1.5 m to 3.0 m, in any material except rock
requiring blasting part return fill in and ram and surplus disposed within the site as
directed.

Cu.m

530.00

Excavation for Well or Pit, from 3.0 m to 4.5 m, in any material except rock
requiring blasting part return fill in and ram and surplus disposed within the site as
directed.

Cu.m

670.00

Cu.m

800.00

Cu.m

930.00

Cu.m

1,060.00

Excavation for Well, from 4.5 m to 6.0 m, in any material except rock requiring
blasting part return fill in and ram and surplus disposed within the site as directed.

Excavation for Well, from 6.0 m to 7.5 m, in any material except rock requiring
blasting part return fill in and ram and surplus disposed within the site as directed.

Excavation for Well or Pit, from 1.5 m to 3.0 m, in Soft rock, except rock requiring
blasting, surplus disposed within the site as directed.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 195 of 263

B009

B010

B011

B012

B013

B014

B015

B016

B017

Excavation for Well or Pit, from 3.0 m to 4.5 m, in Soft rock, except rock requiring
blasting, surplus disposed within the site as directed.

Cu.m

1,190.00

Excavation for Well, from 4.5 m to 6.0 m, in Soft rock, except rock requiring
blasting, surplus disposed within the site as directed.

Cu.m

1,320.00

Excavation for Well, from 6.0 m to 7.5 m, in Soft rock, except rock requiring
blasting, surplus disposed within the site as directed.

Cu.m

1,450.00

Excavation & levelling site in any material except rock requiring blasting surplus
disposed including transport upto 0.4Km.depositing and levelling.

Cu.m

389.00

Filling under floors with gravel or other approved quality of filling, spread, watered
and well rammed in 75mm layers (Materials available at site.)

Cu.m

474.00

Filling under floors with gravel or other approved quality filling spread watered and
well rammed in 75mm layers. (25Km) transported.

Cu.m

1,542.00

Filling under floors with gravel or other approved quality of filling, spread, watered
and rammed in 75mm layers (25 km transport).

Cu.m

1,671.00

Filling around the building with gravel or other approved quality filling spread
watered and well rammed. (25Km) transported.

Cu.m

1,280.00

Filling around the building with gravel or other approved quality of filling, spread,
watered and well rammed. (30 km transport).

Cu.m

1,409.00

C - CONCERTOR
C001

Cement concrete 1:3:6(50), above 3 Cu.m.

Cu.m

11,350.00

C002

Cement concrete 1:3:6(50), upto 3 Cu.m.

Cu.m

11,970.00

C003

Cement concrete 1:3:6(40), above 3 Cu.m.

Cu.m

11,870.00

C004

Cement concrete 1:3:6(40), upto 3 Cu.m.

Cu.m

12,500.00

C005

Cement concrete 1:3:6(25), above 3 Cu.m.

Cu.m

11,950.00

C006

Cement concrete 1:3:6(25), upto 3 Cu.m.

Cu.m

12,580.00

C007

Cement concrete 1:2 1/2:5(25), above 3 Cu.m.

Cu.m

12,750.00

C008

Cement concrete 1:2 1/2:5(25), up to 3 Cu.m.

Cu.m

13,370.00

C009

Cement concrete 1:2:4(20), above 3 Cu.m. - Ground floor

Cu.m

14,430.00

C010

Cement concrete 1:2:4(20), above 3 Cu.m. - First floor

Cu.m

14,960.00

C011

Cement concrete 1:2:4(20), above 3 Cu.m. - Second floor

Cu.m

15,740.00

C012

Cement concrete 1:2:4(20), upto 3 Cu.m. - Ground Floor

Cu.m

15,060.00

C013

Cement concrete 1:2:4(20), upto 3 Cu.m. - First Floor

Cu.m

15,580.00

C014

Cement concrete 1:2:4(20), upto 3 Cu.m. - Second Floor

Cu.m

16,370.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 196 of 263

C015

75 mm thick floor Cement concrete 1:3:6(50).

Sq.m

940.00

C016

75 mm thick floor Cement concrete 1:3:6(40).

Sq.m

982.00

C017

75 mm thick floor Cement concrete 1:2 1/2:5(25).

Sq.m

1,050.00

C018

Lintol 112mm x 150mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

850.00

Lintol 225mm x 150mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

1,048.00

Lintol 225mm x 225mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

1,407.00

Lintol 300mm x 225mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

1,686.00

Lintol 337mm x 150mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

1,369.00

Lintol 337mm x 225mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

1,867.00

Lintol 337mm x 300mm, cement concrete1:2:4(20), Including form work


(Reinforcement paid separately).

L.m

2,166.00

Cement concrete 1:2 1/2:5(25) Using concrete mixture and vibrator (R/F &
Shuttering paid separately).

Cu.m

13,150.00

Cement concrete 1:1 1/2:3(20) in ground floor, using concrete mixture and
vibrator (R/F & Shuttering paid separately).

Cu.m

16,770.00

Cement concrete 1:1 1/2:3(20) in first floor, using concrete mixture and vibrator
(R/F & Shuttering paid separately).

Cu.m

17,300.00

Cement concrete 1:1 1/2:3(20) in Second floor, using concrete mixture and
vibrator (R/F & Shuttering paid separately).

Cu.m

18,080.00

Cement concrete 1:2:4(20) in column shafts in ground floor using mixer and
vibrator. (Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,320.00

Cement concrete 1:2:4(20) in column shafts in First floor using mixer and
vibrator. (Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,840.00

Cement concrete 1:2:4(20) in column shafts in Second floor using mixer and
vibrator. (Reinforcement, shuttering & finishes paid for separately)

Cu.m

16,630.00

Cement concrete 1:2:4(20) in Beams in ground floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,370.00

Cement concrete 1:2:4(20) in Beams in First floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,630.00

C019

C020

C021

C022

C023

C024

C025

C026

C027

C028

C029

C030

C031

C032

C033

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 197 of 263

C034

C035

C036

C037

C038

C039

C040

C041

C042

C043

C044

C045

C046

C047

C048

C049

C050

C051

Cement concrete 1:2:4(20) in Beams in Second floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

16,020.00

Cement concrete 1:2:4(20) in Lintols in ground floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,560.00

Cement concrete 1:2:4(20) in Lintols in First floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

16,080.00

Cement concrete 1:2:4(20) in Lintols in Second floor using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

16,870.00

Cement concrete 1:2:4(20) in RCC first floor slab, using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

15,530.00

Cement concrete 1:2:4(20) in RCC Second floor slab, using mixer and vibrator.
(Reinforcement, shuttering & finishes paid for separately)

Cu.m

16,020.00

100mm thick RCC 1:2:4(20) cement conc. in first floor slab (Reinforcement,
shuttering and finishes paid for separately) using mixer & Vibrator

Sq.m

1,576.00

Sq.m

1,626.00

Sq.m

1,882.00

Sq.m

1,932.00

100mm thick RCC 1:2:4(20) cement conc. in second floor slab (Reinforcement,
shuttering and finishes paid for separately) using mixer & Vibrator

125mm thick RCC 1:2:4(20) cement conc. in first floor slab (Reinforcement,
shuttering and finishes paid for separately) using mixer & Vibrator
125mm thick RCC 1:2:4(20) cement conc. in second floor slab (Reinforcement,
shuttering and finishes paid for separately) using mixer & Vibrator
Channels 50mm semi circular, formed in cement concrete floors and 12mm thick
1:2cement rendering (extra over conc. floors.)

L.m

161.00

Channels 100mm semi circular, formed in cement concrete floors and 12mm thick
1:2cement rendering (extra over conc. floors.)

L.m

285.00

Corbel stone 150mmx225mmx375mm in cement conc. 1:2:4(20) reinforced with 4


Nos. 10mm rods up to 0.03 Cu.m. in volume.

No.

800.00

Curb in 1:2:4(20) cement concrete, 225mm high 75mm thick, 12mm thick 1:2
cement rendering. Rate to include excavation.

L.m

1,370.00

L.m

1,640.00

Pad stones, 337mm x 337mmx225mm in 1:2:4(20) cement conc. precast or in


situ with formwork.

No.

685.00

Pad stones, 450mm x 337mmx150mm in 1:2:4(20) cement conc. precast or in


situ with formwork

No.

600.00

Semi circular drains without ramps in cement conc. 1:3:6(25) 225mm wide and
225mm average depth with 75mm thick sides and base inclusive of 12mm 1:3
cement rendering with expansion joints as necessary. Rate to include for
excavation..

Pad stones, 450mm x 225mmx150mm in 1:2:4(20) cement conc. precast or in


situ with formwork
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 198 of 263

C052

C053

C054

C055

C056

C057

C058

C059

C060

C061

C062

C063

C064

Pad stones, 450mm x 225mmx150mm in 1:2:4(20) cement conc. precast or in


situ with formwork

No.

400.00

Spur stone 200mm x 200mm x 150mm in 1:2:4(20) cement conc. for veranda
posts supplied and fixed.

No.

127.00

Spur stones 100mm x 75mm x 50mm in 1:2:4(20) cement conc. for door posts
supplied and fixed.

No.

61.00

Window Sill, 225mmx75mm, cement concrete1:2:4(20), Reinforcement with 2 No.


10mm tor steel and 6mm links at 225mm crs. including form work.

L.m

746.00

Lintol 112mm x 150mm, cement concrete1:2:4(20), Reinforcement with 2 No.


10mm tor steel including form work.

L.m

970.00

Lintol 225mm x 150mm, cement concrete1:2:4(20), Reinforcement with 2 No.


12mm tor steel including form work.

L.m

1,250.00

100mm thick flat roof in 1:2:4(20) cement concrete and reinforced with 10mm tor
steel at 125mm centers both ways including shuttering.

Sq.m

4,220.00

75mm thick RCC flat roof in 1:2:4(20) cement concrete and reinforced with 10mm
tor steel at 125mm centers and 6mm mild steel at 200mm centers including
shuttering.

Sq.m

3,200.00

75mm thick RCC slab in 1:2:4(20) cement concrete and reinforced with 10mm tor
steel at 125mm centers and 6mm mild steel at 200mm centers. - for sockage pit
or drain cover slab.

Sq.m

1,880.00

No.

11,720.00

No.

14,440.00

No.

9,540.00

Construction of 300x300mm size RC concrete Gate Post with 75mm thick


1:3:6(40) concrete Base, 600x600x225mm 1:2:4(20) concrete Footing, plastering
and White or colour washing. Rate to include 600mm deep excavation,10mm tor
@ 150mm centres both ways in footing, 4 No. 12mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.5m all as
per type plan.

Construction of 300x300mm size RC concrete Gate Post with 75mm thick


1:3:6(40) concrete Base, 600x600x225mm 1:2:4(20) concrete Footing, plastering
and White or colour washing. Rate to include 600mm deep excavation,10mm tor
@ 150mm centres both ways in footing, 4 No. 16mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.8m all as
per type plan.

Construction of 225x225mm size RC concrete Gate Post with 75mm thick


1:3:6(40) concrete Base, 600x600x225mm 1:2:4(20) concrete Footing, plastering
and White or colour washing. Rate to include 600mm deep excavation,10mm tor
@ 150mm centres both ways in footing, 4 No. 12mm tor and 6mm stirrups at
150mm centres in column and shuttering. Column above ground level 1.5m all as
per type plan.

Shuttering for Footing and dismateling to surface area, including class II timber
joists and necessary props.

Sq.m

895.00

Shuttering for column shafts in ground floor including class II timber joists and
necessary
props.
Rate
to
include
for
removal.
(for
column
225mmx225mmx1200mm high.)

Sq.m

1,664.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 199 of 263

C065

C066

C067

C068

C069

C070

C071

C072

Shuttering for column shafts in First floor including class II timber joists and
necessary
props.
Rate
to
include
for
removal.
(for
column
225mmx225mmx1200mm high.)

Sq.m

1,674.00

Shuttering for column shafts in second floor including class II timber joists and
necessary
props.
Rate
to
include
for
removal.
(for
column
225mmx225mmx1200mm high.)

Sq.m

1,714.00

Sq.m

1,204.00

Sq.m

1,229.00

Sq.m

1,254.00

Shuttering for first floor slab conc. Including 100x50mm class II joists and
necessary props. Rate to include for removal.

Sq.m

1,298.00

Shuttering for second floor slab conc. Including 100x50mm class II joists and
necessary props. Rate to include for removal.

Sq.m

1,358.00

Shuttering for third floor slab conc. Including 100x50mm class II joists and
necessary props. Rate to include for removal.

Sq.m

1,418.00

Shuttering for beam and lintols in ground floor including class II timber joists and
necessary props. Rate to include for removal. (300mmx450mm beam-6.1m long.)

Shuttering for beam and lintols in first floor including class II timber joists and
necessary props. Rate to include for removal. (300mmx450mm beam-6.1m long.)

Shuttering for beam and lintols in second floor including class II timber joists and
necessary props. Rate to include for removal. (300mmx450mm beam-6.1m long.)

D - BRICK LAYER
D001

Arch, Segmental, brick work in 1:3 cement mortar including centering.

Cu.m

11,190.00

D002

Brick work in 1:5 cement mortar up to 1st floor level - above 3 Cu.m.

Cu.m

8,410.00

D003

Brick work in 1:5 cement mortar from 1st floor level to second floor level. - above
3 Cu.m.

Cu.m

8,840.00

Brick work in 1:5 cement mortar from second floor level to third floor. - above 3
Cu.m.

Cu.m

9,360.00

D005

Brick work in 1:5 cement mortar up to 1st floor level - up to 3 Cu.m.

Cu.m

8,910.00

D006

Brick work in 1:5 cement mortar from 1st floor level to second floor level. - up to
3 Cu.m.

Cu.m

9,340.00

D007

Brick work in 1:5 cement mortar from second floor level to third floor. - up to 3
Cu.m.

Cu.m

9,870.00

D008

Brick work in 1:5 cement mortar in piers up to 1st floor level

Cu.m

9,410.00

D009

Brick work in 1:5 cement mortar in piers from 1st floor level to second floor level.

Cu.m

9,840.00

D004

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 200 of 263

D010

Brick work in 1:5 cement mortar in piers from second floor level to third floor.

D011

Brick work in 1:3 cement mortar with bricks available at site including shorting and
cleaning bricks.

Cu.m

10,370.00

Cu.m

4,730.00

Sq.m

1,030.00

D012

Brick work 112mm thick in 1:3 cement mortar up to 1st floor level - above 10 sq.m

D013

Brick work 112mm thick in 1:3 cement mortar from 1st floor level to 2 nd floor
level - above 10 sq.m

Sq.m

1,070.00

Brick work 112mm thick in 1:3 cement mortar from 2 nd floor level t 3 rd floor level
- above 10 sq.m

Sq.m

1,150.00

D015

Brick work 112mm thick in 1:3 cement mortar up to 1st floor level - up to 10 sq.m

Sq.m

1,110.00

D016

Brick work 112mm thick in 1:3 cement mortar from 1st floor level to 2 nd floor
level - up to 10 sq.m

Sq.m

1,160.00

Brick work 112mm thick in 1:3 cement mortar from 2 nd floor level t 3 rd floor level
- up to 10 sq.m

Sq.m

1,240.00

Brick work 112mm thick in 1:5 cement mortar with available bricks, including
sorting and cleaning.

Sq.m

600.00

Coping, brick in cement 1:5, weathered and throated on 112mm thick to walls,
complete with 12mm thick 1:3 cement rendering.

L.m

660.00

Coping, brick in cement 1:5, weathered and throated on 225mm thick to walls,
complete with 12mm thick 1:3 cement rendering.

L.m

910.00

Coping, brick in cement 1:5, weathered and throated on 350mm thick to walls,
complete with 12mm thick 1:3 cement rendering.

L.m

1,340.00

Coping, brick in cement 1:5, weathered and throated on 112mm thick to walls,
and 12mm thick 1:3 cement rendering with available bricks.

L.m

561.00

Coping, brick in cement 1:5, weathered and throated on 225mm thick to walls,
and 12mm thick 1:3 cement rendering with available bricks.

L.m

731.00

Coping, brick in cement 1:5, weathered and throated on 350mm thick to walls,
and 12mm thick 1:3 cement rendering with available bricks.

L.m

1,090.00

Cornices, brick in cement 1:5, and 12mm thick 1:3 cement rendering, up to
225mm thick projection and 225mm depth.

L.m

1,490.00

No.

7,070.00

L.m

1,770.00

D014

D017

D018

D019

D020

D021

D022

D023

D024

D025

D026

D027

Inserting of door or window in existing walls including making opening and making
good to floors and walls (lintol or arch & door or and window paid separately).

Drains, brick in cement 1:5, 225mm to 300mm average depth, 300mm wide, and
cement rendered 12mm thick 1:2 complete with expansion joints as necessary,
including necessary excavation. (apron paid for separately)

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 201 of 263

D028

D029

D030

D031

D032

D033

Drains, brick in cement 1:5, 150mm to 225mm average depth, 225mm wide, and
cement rendered 12mm thick 1:2 complete with expansion joints as necessary,
including necessary excavation. (apron paid for separately)

L.m

1,210.00

L.m

2,840.00

L.m

2,290.00

Steps, 300mm wide and 150mm to 225mm high masonry or brick work in cement
mortar 1:3, rendered 12mm thick 1:2 cement and sand with foundation 150mm
below ground.

L.m

880.00

Vent openings up to 300mm height and 150mm width, formed on existing walls,
and walls made good.

No.

270.00

L.m

7,420.00

Drains, brick in cement 1:5, 225mm to 300mm average depth, 300mm wide, and
cement rendered 12mm thick 1:2 complete with expansion joints as necessary,
including necessary excavation and 750mm wide apron formed of brick masonry

Drains, brick in cement 1:5, 150mm to 225mm average depth, 225mm wide, and
cement rendered 12mm thick 1:2 complete with expansion joints as necessary,
including necessary excavation and 750mm wide apron formed of brick masonry

Construction of Boundary wall with 100mm thick 1:3:6(40) concrete base, RR


masonry foundation, DPC, 225x225mm brick column at 2.4m centres, 112mm
brick work, brick copping, 16mm plaster, expansion joints and white or colour
washing. All as per drawing

E - MASONARY
E001

Random rubble masonary in 1:5 cement mortar, above 3 Cu.m.

Cu.m

8,500.00

E002

Random rubble masonary in 1:5 cement mortar, upto 3 Cu.m.

Cu.m

8,890.00

E003

Random rubble masonary in 1:5 cement mortar with available rubble,


including sorting out and cleaning rubble.

Cu.m

6,500.00

F - PAVIOR
F001

Expansion joints in brick floors filled with bitumen and sand.

L.m

52.50

F002

Expansion joints in Conc. Floors filled with bitumen and sand (to full depth of
conc. & rendering) - 6mm thick and 100mm deep.

L.m

89.00

F003

Floors, brick paved, 75mm thick set in 2:5 lime mortar.

Sq.m

870.00

F004

Floors, brick paved, 75mm thick set in 2:5 lime mortar with available bricks,
including sorting out and cleaning bricks.

Sq.m

600.00

Floors, brick paved, 75mm thick set in lime mortar 2:5, and cement rendered
12mm, 1:2.

Sq.m

1,260.00

Floors, brick paved, 75mm thick set in lime mortar 2:5, and cement rendered
12mm, 1:2 with available bricks, including sorting out and cleaning bricks.

Sq.m

990.00

F007

Floors, brick paved, 75mm thick, set in cement mortar 1:5.

Sq.m

860.00

F008

Floors, brick paved, 75mm thick, set in cement mortar 1:5, with available bricks,
including sorting out and cleaning bricks.

F005

F006

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 202 of 263

Floors, brick paved, 75mm thick, set in cement mortar 1:5, with available bricks,
including sorting out and cleaning bricks.

Sq.m

590.00

F009

Floors, brick paved, 75mm thick, set in cement mortar 1:5, and cement rendered
12mm, 1:2.

Sq.m

1,250.00

F010

Floors, cement concrete 1:2 1/2:5 (25), 75mm thick, and 12mm thick 1:2 cement
rendered with expansion joints filled with cement and sand.

Sq.m

1,370.00

Sq.m

3,390.00

F011

Floors, upper, 100mm thick 1:2 :4 (20) cement concrete with 12mm thick 1:3
cement rendering and soffit plastering with lime putty and expansion joints filled
with cement and sand. Rate to include for shuttering. (reinforcement paid for
separately).

F012

Floors, gravel, 100mm thick, Spread, Watered and rammed.

Sq.m

154.00

F013

Terrazzo tile flooring Supplied and laid. Rate to include for 12mm thick 1:3 cement
mortar levelling screed etc.

Sq.m

2,720.00

Glazed tile flooring Supplied and laid. Rate to include for 12mm thick 1:3 cement
mortar levelling screed etc.

Sq.m

2,960.00

Glazed tile flooring 200x200 supplied an laid of approved pattern and colour to
floors including 20mm thick 1:3 cement sand bedding

Sq.m

4,440.00

Tiles glazed - white150x150mm, with all specials, supplied and fixed to walls
including raking plaster and bedding in cement mortar 1:2.

Sq.m

14,280.00

Tiles glazed, with all specials, fixed to walls including raking plaster and bedding
in cement mortar 1:2. (Tiles supplied by client.)

Sq.m

780.00

Sq.m

2,770.00

-do- - Two storyed buildings.

Sq.m

2,810.00

-do- - Three storyed buildings.

Sq.m

2,860.00

Sq.m

2,650.00

-do- - two storyed buildings.

Sq.m

2,690.00

-do- three storyed buildings.

Sq.m

2,740.00

Sq.m

2,820.00

F014

F015

F016

F017

G - ROOFER
G001

Roof, Hipped with calicut pattern tiles on 150x50 ridge and hip plates, 150x75
purlin, 100x75 wall plates, 100x50 rafter at 550mm centres and 50x25 reeper at
300 centres in sp.cl.upper timber frame work including ridging and application of
two coats wood preservative etc. - single storyed buildings.

G002

Roof, Hipped - do-

-do-

G003

Roof, Hipped -do-

G004

Roof, Gable with calicut pattern tiles on 150x50 ridge plates, 150x75 purlin,
100x75 wall plates, 100x50 rafter at 550mm centres and 50x25 reeper at 300
centres in sp.cl.upper timber frame work including ridging and application of two
coats wood preservative etc. - single storyed buildings.

-do-

G005

Roof, Gable -do-

-do-

G006

Roof, Gable -do-

G007

Roof, Gable-School type with calicut pattern tiles on 150x50 ridge plates, 150x75
purlin, 150x75 wall plates, 100x50 rafter at 450mm centres and 50x25 reeper at
300 centres in sp.cl.upper timber frame work including ridging and application of
two coats wood preservative etc. - single storyed buildings.

-do-

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 203 of 263

-do- - two storyed buildings.

Sq.m

2,870.00

-do- - three storyed buildings.

Sq.m

2,910.00

Sq.m

2,460.00

Sq.m

2,630.00

Supplying and fixing calicut pattern tiles roof on sp.cl.upper timber frame work
including ridging and application of two coats wood preservative etc. - materials
available single storyed buildings

Sq.m

680.00

G013

Supplying and

G014

Supplying and -do-

G015

Lean Roof, with calicut pattern tiles in sp.cl.upper timber frame work including
application of two coats wood preservative etc. - Materials available

G008

Roof, Gable-School type -do-

G009

Roof, Gable-School type -do-

G010

Lean Roof, with calicut pattern tiles on 150x75 wall plates, 100x50 rafter at
550mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber frame work
including application of two coats wood preservative etc.

G011

G012

-do-do-

Lean Roof, School type with calicut pattern tiles on 150x75 wall plates, 100x50
rafter at 450mm centres and 50x25 reeper at 300 centres in sp.cl.upper timber
frame work including application of two coats wood preservative etc.

-do-

two storyed buildings

Sq.m

730.00

-do-

three storyed buildings

Sq.m

770.00

Sq.m

500.00

Fixing 50x25 reeper at 300 centres, laying tiles and ridging with available
materials on existing frame work

Sq.m

190.00

G017

Calicut pattern ridge bedded in cement & lime mortar 1:1:4 coloured to match
tiles.

L.m

456.00

G018

Calicut pattern ridging bedded in cement & lime mortar 1:1:4 coloured to match
tiles (tiles available at site).

L.m

330.00

Ridging with half round or calicut pattern tiles removed and re-laid in lime cement
mortar 1:1:4 & coloured to match tiles.

L.m

448.00

Skylight glass 600x600mm, 5mm thick ribbed, supplied & fixed to roof including
necessary lime cement filleting.

No.

876.00

No.

55.30

G016

G021

G022

-do-

-do-do-

G023

Tiles, calicut pattern, flat supplied and laid up to 5 tiles in single storied building.

G024

Tiles, calicut pattern, flat supplied and laid above 4 and up to 25 tiles in single
storied building.

No.

46.00

G025

Tiles, calicut pattern, flat supplied and laid up to 5 tiles in building of more than
one storey.

No.

70.70

G026

Tiles, calicut pattern, flat supplied and laid above 4 and up to 25 tiles in building of
more than one storey.

No.

52.20

G027

Tiles, calicut pattern, supplied and laid in any buildings.

Sq.m

576.00

G028

Laying calicut pattern tiles in any buildings (Tiles available at site).

Sq.m

39.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 204 of 263

G029

Glass tiles laid in small quantities including fixing with G.I. Wire where necessary
(Tiles supplied by the client).

No.

46.00

Sq.m

26.00

G030

Shifting & relaying calicut pattern tiles.

G031

Supply only calicut pattern flat tiles

No.

39.90

G032

Supply only calicut pattern ridge tiles

No.

51.30

G033

Sorting out of available timber cut to required sizes and fixed in roof and other
carpentry work.

Cu.m

22,610.00

G034

Supply and fixing 200 x 100 timber beam and 100 x 100 post in spl.cl. up. timber
work

Cu.m

101,680.00

G035

Supply and fixing 150 x 100 timber beam and 100 x 100 post in spl.cl. up. timber
work

Cu.m

86,450.00

G036

Supply and fixing 150 x 50 timber ridge plate in spl.cl. up. timber work

Cu.m

91,360.00

G037

Supply and fixing 150 x 75 timber purlin in spl.cl. up. timber work

Cu.m

92,900.00

G038

Supply and fixing 100 x 75 timber wall plate in spl.cl. up. timber work

Cu.m

94,760.00

G039

Supply and fixing 100 x 50 timber rafter in spl.cl. up. timber work

Cu.m

96,080.00

G040

Supplying and fixing of 50mm x50mm reepers or runners in sp.cl.up. timber new
or renewed with iron nails.

L.m

172.00

Supplying and fixing of 50mm x25mm reepers in sp.cl.up. timber new or renewed
with iron nails up to 30m (shifting of tiles paid for separately).

L.m

62.00

Supplying and fixing of 50mm x25mm reepers in sp.cl.up. timber new or renewed
with iron nails above 30m (shifting of tiles paid for separately).

L.m

58.00

G043

Supplying and fixing of 50mm x12mm reepers in timber new or renewed with iron
nails up to 30mm.

L.m

64.00

G044

Fixing of available reepers with wire nails.

L.m

16.20

G045

Supply only 150 x 50 ridge plate in spl.cl. up. timber

Cu.m

76,320.00

G046

Supply only 150 x 75 purlin in spl.cl. up. Timber.

Cu.m

78,020.00

G047

Supply only 100 x 75 wall plate in spl.cl. up. Timber.

Cu.m

79,460.00

G048

Supply only 100 x 50 rafter in spl.cl. up. Timber.

Cu.m

78,170.00

G049

Supplying only 50mm x50mm reepers or runners in sp.cl.up. timber.

L.m

134.00

G050

Supplying only 50mm x25mm reepers in sp.cl.up. Timber.

L.m

42.00

G051

Supplying only 50mm x12mm reepers in sp.cl.up. Timber.

L.m

39.00

G052

Supplying & fixing of corrugated aluminium sheets to roof or wall on existing


frame work with hooks, bolts or drive screws etc.

Sq.m

810.00

G041

G042

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 205 of 263

G053

G054

G055

G056

G057

Supplying & fixing of corrugated asbestos sheets roofing on spl.cl.up. 125 x 75


timber purlins complete including treating timber with wood preservative. ridging
measured separately.

Sq.m

1,980.00

Sq.m

1,940.00

Sq.m

2,230.00

Supplying & fixing of corrugated asbestos sheets to roof or wall on existing frame
work with necessary coach screws and limpet washers or hook bolts.

Sq.m

860.00

Supplying & fixing of corrugated asbestos sheets to roof or wall on existing frame
work with necessary coach screws and limpet washers or hook bolts. (sheets
available)

Sq.m

175.00

Supplying & fixing of corrugated asbestos sheet walling on 100 x 50 sp.cl.up.


timber frame work complete.
Supplying & fixing of corrugated asbestos sheets roofing on spl.cl.up. 150 x 50
ridge plate, 100 x 75 wall plate, 150 x 75 purlin, 100 x 50 rafter at 0.9 m centres
and 50 x 50 runners at max. 1.05 m centres complete including treating timber
with wood preservative. (ridging measured separately.)

G058

Rectification of leaks (up to 5 in No.) in roofs of single storeyed building.

No.

123.00

G059

Rectification of leaks (above 5 in No.) in roofs of single storeyed building.

No.

30.00

G060

Rectification of leaks (up to 5 in No.) of roof of building above one storeyed


building.

No.

154.00

G061

Rectification of leaks (above 5 No.) in roofs of building above one storeyed


building.

No.

61.00

G062

Rectification of leaks in corrugated sheet roofs with bitumen washers & G.I. Bolts
& nuts.

No.

136.00

G063

Fixing asbestos cement, aluminium alloy or G.I.ridging available at site with hook
bolts or screws.

L.m

264.00

G064

Asbestos ridging complete with roofing screws or hooks.

L.m

760.00

G065

S/Laying half round tiles over the existing asbestos roof.

Sq.m

59.00

I - CARPENTER & JOINER


I001

40mm to 50mm x 12mm plain chamfered special class timber beading fixed
complete with brass screws.

L.m.

102.00

I002

40mm to 50mm x 12mm plain chamfered special class timber beading fixed
complete with brass screws.

L.m.

94.00

I003

Beading or filletting 12 x 12mm in Spl.cl.up. timber for glass panes fixed complete
with brass spring of iron panel pins.

L.m.

88.00

I004

Beading or filletting on under side of ceiling removed and re fixed with iron screws
complete.

L.m.

49.00

I005

Board, barge, valance, fascia 175 x 20mm thick in Ginisappu timber fixed
complete with necessary screws.

L.m.

374.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 206 of 263

I006

Board, barge, valance, fascia 200 x 20mm thick in Ginisappu timber fixed
complete with necessary screws.

L.m.

416.00

I007

Board, barge, valance, fascia 225 x 20mm thick in Ginisappu timber fixed
complete with necessary screws.

L.m.

456.00

I008

Barge valance facia boards available fixed including cutting and minor repairs.

L.m.

55.00

I009

Flat asbestos ceiling fixed to 100mmx50mm joists and 50mm bearers of special
class uppertimder including 40mmx12mm cover fillets and 63mmx25mm coves of
special class upper timder. Rate to include 2 coats of tarnap to joists &
bearers,primer and 2 coats of emulsion paint to asbestos sheet & oil paint to
beading.

Sq.m.

2,580.00

Flat asbestos ceiling fixed to 100mmx50mm joists and 50mm bearers of special
class uppertimder including 40mmx12mm cover fillets and 63mmx25mm coves of
special class upper timder.

Sq.m.

2,060.00

1011

Asbestos ceiling or partition fixed with clout headed nails to existing beareres or
frames (beading or cover fillets paid separately).

Sq.m.

481.00

1012

Ceiling, supplying and fixing 12mm thick lunumidilla planks lapped & nailed to

Sq.m.

2,580.00

sp.cl.up.timber. Rate to include for 2 coats of tarnap to joists and bearers.

Sq.m.

2,670.00

1014

Lunmidella ceiling boards of 150mmx20mm renewed in small quantities.

Sq.m.

1,277.00

I015

Lunmidella ceiling fixed with wire nails (boards available at site).

Sq.m.

222.00

I016

20mm Lunmidella ceiling or partition beaded and rebated nailed to under


side of existing joists rafters or frames above 10m2 (fillets or beading
paid for separately).

Sq.m.

1,100.00

20mm Lunmidella ceiling or partition beaded and rebated nailed to under


side of existing joists rafters or frames upto 10 Sq.m(fillets or beading
paid for separately).

Sq.m.

1,153.00

Ceiling openings 600mmx450mm approx. formed complete with


50mmx50mm bearers(glass tiles or sheets paid for separately).

No.

1,548.00

1010

frame work consisting of 100x50mm joists and 50x50mm bearers in


sp.cl.up.timber. Rate to include for 2 coats of tarnap to joists and bearers.
1013

Ceiling, supplying and fixing 20mm thick lunumidilla planks lapped & nailed to
frame work consisting of 100x50mm joists and 50x50mm bearers in

I017

I018

I019

Cleaning of ceiling upper side and cleaning away the debris.

I020

Cove moulding with special upper 63x40 timber fixed with Iron screws
and plugs new or renewed.

I021

Sq.m.

19.90

L.m.

134.00

Supplying and fixing of doors and windows ledged braced and battended
with grooved and tongued joints 100mmx75mm frames and 25mm thick
sashes in spl.cl.upper timber complete with iron oxi. fittings and lock.

I022

Sq.m.

Supplying and fixing of doors and windows ledged braced and battended
with grooved and tongued joints 25mm thick sashes in spl.cl.upper timber
complete with iron
oxi. fittings OF
andBUILDINGS
lock.
275544406.xls
- DEPARTMENT
- RATES SUMMARY - PAGE No: - 207 of

263

8,890.00

I023

I024

I025

I026

I027

I028

I029

I030

I031

I032

I033

I034

I035

I036

I037

I038

Supplying and fixing of doors and windows ledged braced and battended
with grooved and tongued joints 25mm thick sashes in spl.cl.upper timber
complete with iron oxi. fittings and lock.

Sq.m.

6,100.00

Supplying and fixing of doors and windows ledged braced and battended
with grooved and tongued joints 25mm thick sashes in spl.cl.upper timber
complete with available iron oxi. fittings and lock.

Sq.m.

4,900.00

Garage door, frame & battened Supplying and fixing of 31mm thick sash and
125mm x 100mm frames in Sp. Cl. Up. timber with iron pintels and strap hinges
for doors.

Sq.m.

7,570.00

Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x
75mm frames in special upper timber for doors with iron oxi. fittings & motice lock
union English.

Sq.m.

10,160.00

Supplying and fixing of glazed and panelled 28mm thick sash in special upper
timber for doors with iron oxi. fittings & motice lock union English.

Sq.m.

8,910.00

Supplying and fixing of glazed and panelled 28mm thick sash in special upper
timber for doors with available iron oxi. Fittings.

Sq.m.

6,610.00

Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x
75mm frames in special upper timber for doors with iron oxi. fittings & motice lock
union Chinese.

Sq.m.

6,120.00

Supplying and fixing of glazed and panelled 28mm thick sash in special upper
timber for doors with iron oxi. fittings & motice lock union Chinese.

Sq.m.

7,720.00

Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x
75mm frames in special upper timber for doors with brass fittings & motice lock
union English.

Sq.m.

11,860.00

Supplying and fixing of glazed and panelled 28mm thick sash in special upper
timber for doors with brass fittings & motice lock union English.

Sq.m.

10,570.00

Supplying and fixing of glazed and panelled 28mm thick sash and with 100mm x
75mm frames in special upper timber for doors with brass fittings & motice lock
union Chinese.

Sq.m.

9,980.00

Supplying and fixing of glazed and panelled 28mm thick sash in special upper
timber for doors with brass fittings & motice lock union Chinese.

Sq.m.

6,830.00

Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x
75mm frames in special upper timber with iron oxi. fittings & motice lock union
English.

Sq.m.

6,600.00

Doors fully panelled supplying and fixing of 28mm thick sash in special upper
timber with iron oxi. fittings & motice lock union English.

Sq.m.

8,880.00

Doors fully panelled supplying and fixing of 28mm thick sash in special upper
timber with available iron oxi. Fittings.

Sq.m.

6,080.00

Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x
75mm frames in special upper timber with iron oxi. fittings & motice lock union
Chinese.

Sq.m.

8,750.00

Doors fully panelled supplying and fixing of 28mm thick sash in special upper
timber with iron oxi. fittings & motice lock union Chinese.
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 208 of 263

I039

I040

I041

I042

I043

I044

I045

I046

I047

I048

I049

I050

I051

Doors fully panelled supplying and fixing of 28mm thick sash in special upper
timber with iron oxi. fittings & motice lock union Chinese.

Sq.m.

7,250.00

Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x
75mm frames in special upper timber with brass fittings & motice lock union
English.

Sq.m.

10,500.00

Doors fully panelled supplying and fixing of 28mm thick sash in special upper
timber with brass fittings & motice lock union English.

Sq.m.

9,260.00

Doors fully panelled supplying and fixing of 28mm thick sash and with 100mm x
75mm frames in special upper timber with brass fittings & motice lock union
Chinese.

Sq.m.

9,930.00

Door fully panelled supplying and fixing of 28mm thick sash in special upper
timber with brass fittings & motice lock union Chinese.

Sq.m.

7,630.00

Window glazed supplying and fixing 28mm thick sash and with 100mm x 75mm
frames in special upper timber with iron oxi. Fittings.

Sq.m.

9,280.00

Window glazed supplying and fixing 28mm thick sash and with 100mm x 75mm
frames in special upper timber with iron oxi. Fittings and 16mm dia MS bar at
approx. 100mm centers horizondaly.

Sq.m.

9,850.00

Window glazed supplying and fixing 28mm thick sash in special upper timber
with iron oxi. Fittings.

Sq.m.

7,430.00

Window glazed supplying and fixing 28mm thick sash in special upper timber
with available iron oxi. Fittings.

Sq.m.

6,150.00

Window fully paneled supplying and fixing 28mm thick sash and with 100mm x
75mm frames in special upper timber with iron oxi. Fittings.

Sq.m.

10,330.00

Window fully paneled supplying and fixing 28mm thick sash and with 100mm x
75mm frames in special upper timber with iron oxi. Fittings and 16mm dia MS bar
at approx. 100mm centers horizondaly.

Sq.m.

10,920.00

Window fully paneled supplying and fixing 28mm thick sash in special upper
timber with iron oxi. Fittings.

Sq.m.

6,210.00

Window fully paneled supplying and fixing 28mm thick sash in special upper
timber with available iron oxi. Fittings.

Sq.m.

4,740.00

Fanlight glazed supplying and fixing 28mm thick sash and with 100mm x 75mm
frames in special upper timber with iron oxi. Fittings.

Sq.m.

12,870.00

I052

Removing easing and refixing of doors or windows.

No.

352.00

I053

Easing of doors and windows.

No.

142.00

I054

Altering door or window frame by filling existing rebate using sp.cl.up. timber and
rechanging screws and sashes rehung on opposite side.

No.

2,560.00

I055

Renewing of qlazing bars in door or window sash 31 x 31mm in sp.cl.up.

m.

656.00

I056

Fixing of door or window sashes to position (sash and fittings supplied by


Department.

No.

728.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 209 of 263

I057

Removing and refixing of door sashes in new position.

No.

470.00

I058

Supplying and fixing of louver blades with 10mm minimum thickness in spl.cl.up.
Timber upto 100mm width.

m.

316.00

Supplying and fixing of louver blades with 10mm minimum thickness over 100mm
and up to 150mm wide in sp.cl.up. timber.

m.

343.00

Fixing of glazed and 12mm plywood panelled partition in sp.cl.up. timber with
main post 100mm x100mmx3000mm, intermediate posts 100mmx50mm
x2130mm approx. and 40mmx200mm capping complete.

Sq.m.

9,580.00

Supplying of 3 ply plywood panels and fixing to existing frames (beading paid for
separately).

Sq.m.

1,760.00

Renewing of trellis laths 12mmx12mm in sp.cl.up. local timber in quantities over


30m.

m.

75.00

I063

Supplying and fixing of trellis laths 25mmx25mm in local timber.

m.

93.00

I064

Supplying and fixing in position 100mmx75mm door frame in spl.cl.up. timber.

m.

1,321.00

m.

1,053.00

m.

1,119.00

Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood
door hung on 100mm x75mm frame in sp.cl.up. timber complete with iron
furniture and motice lock union English.

Sq.m.

7,860.00

Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood
door hung on 100mm x75mm frame in sp.cl.up. timber complete with iron
furniture and motice lock union Chinise.

Sq.m.

6,550.00

Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood
door on existing frame with fittings and mortice lock English.

Sq.m.

6,040.00

Supplying and fixing of 31mm thick ordinary sash single (ordinary finish) plywood
door on existing frame with fittings and mortice lock Chinise.

Sq.m.

4,430.00

Supplying and fixing of 31mm thick marine type plywood door (ordinary water
proof) on existing frame with fittings and nightlatch lock.

Sq.m.

5,110.00

timber with 50 x 12mm timber beading around the glass pane.

Sq.m.

3,680.00

Sorting out of available timber cut to required sizes and fixed in partitions and
frames.

Cu.m.

37,480.00

I059

I060

I061

I062

I065

I066

I067

I068

I069

I070

I071

I072

Supplying and fixing in position of 100mmx50mm spl.cl.up. timber door frames.

Supplying and fixing in position 100mmx75mm window frame in spl.cl.up. timber.

Supplying and fixing 2100 to 3000mm high, 4.7mm thick glazed partition with
12mm thick chipboard panels on both sides & 100x75mm & 100mmx100mm
uptights at 900mm intervals & 100x50mm as horizontal members in sp.cl.up

I073

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 210 of 263

I074

I075

Doors flushed / panelled 4x3 frame and 1" thick sashes in sp.cl.up. timber
including 9" height trellis work on top and complete with Iron Oxi. Fittings and
locking arrangement.

Sq.m.

10,536.00

Fanlight Glazed supplied and fixing 28mm thick sash and 100 x 75mm frames in
sp.cl.up. timber with Iron Oxi. Fittings

Sq.m.

15,600.00

Glazed window with 4 x 3 frame and 1" thick 3 1/2 wide casement in sp.up.cl.
Timber and provide 1/2" x 1/4" flat iron grill work in cluding 9" height louvers work
on top and complete with Iron Oxi. Fittings and locking arrangement.

Sq.m.

I076

J - IRON MONGER
J001

Bolts barrel, Iron Oxi. 100mm heavy quality supplied & fixed with brass
screws.

No.

188.00

Bolts barrel, Iron Oxi. 150mm heavy quality supplied & fixed with brass
screws.

No.

207.00

Casement fastners, Iron Oxi. with mortice plate polished heavy quality supplied &
fixed with Iron Screws.

No.

208.00

J004

Casement stays, Iron Oxi. 250mm heavy quality supplied & fixed.

No.

277.00

J005

Casement stays, Iron Oxi. 300mm heavy quality supplied & fixed.

No.

305.00

J006

Fanlight catches Iron Oxi. heavy quality, with Iron screws fixed complete.

No.

312.00

J007

Hasp & staple, safty type 150mm Iron oxi. , heavy quality aupplied & fixed with
screws complete.

No.

289.00

Hasp & staple, safty type 100mm Iron oxi. , heavy quality aupplied & fixed with
screws complete.

No.

187.00

Hinges, butt 100x50mm Iron oxi. , heavy quality aupplied & fixed with screws
complete.

No.

288.00

Hinges, butt 100x75mm Iron oxi. , heavy quality aupplied & fixed with screws
complete.

No.

288.00

Hinges, butt 100x100mm Iron oxi. , heavy quality aupplied & fixed with screws
complete.

No.

441.00

Hinges, butt 125x125mm Iron oxi. , heavy quality aupplied & fixed with screws
complete.

No.

531.75

Hinges, butt 150x150mm Iron oxi. , heavy quality aupplied & fixed with screws
complete.

No.

651.45

No.

153.00

J002

J003

J008

J009

J010

J011

J012

J013

J014

Ring Iron oxi. 45mm to 38mm supplied & fixed to doors & windows with screws.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 211 of 263

J015

Supplying & fixing of 45mm x 6mm bolts & nuts with washers.

No.

77.00

J016

Supplying & fixing of 75mm x 10mm Iron bolts & nuts with washers.

No.

80.00

J017

Supplying & fixing of 150mm x 10mm Iron bolts & nuts with washers.

No.

94.00

J018

Supplying & fixing of 225mm x 10mm Iron bolts & nuts with washers.

No.

123.00

J019

Supplying & fixing of 225mm x 16mm Iron bolts & nuts with washers.

No.

117.00

J020

Supplying of 50x50mm G.I. Weldmesh (Guage 10) & fixing to existing frame with
staples (Fillets & beading paid separately)

Sq.m.

1,089.00

Supplying of 50x50mm G.I. Weldmesh (Guage 10) & fixing to window frames with
50x12mm Sp.Cl.Up. Timber beading including painting mesh with red lead & 2
coats of enamel paint, beading with 2 coats of enamel.

Sq.m.

2,104.00

J021

J022

Supplying & fixing of 150mm Iron cabin hooks and eyes.

No.

92.00

J023

Supplying & fixing of 200mm Iron cabin hooks and eyes.

No.

76.00

J024

Making iron gate with 40x40x6mm angle iron frame work including bracing &
horizontal centre member with 16mm M.S. bar at 150mm crs. & fixing in position
complete with starp hinges, hasp & staples.

Sq.m.

Tree hinges, 250mm iron oxi. heavy quality suplied & fixed with screws complete.

No.

407.00

Tree hinges, 300mm iron oxi. heavy quality suplied & fixed with screws complete.

No.

438.00

Mild steel rods in reinforcing lintols or beams, bent to shape, laid in position and
tied with G.I. wire as directed

Kg.

178.00

Mild steel rods in reinforcing in foundation bent to shape, laid in position and tied
with G.I. wire as directed.

Kg.

168.00

Mild steel rods in reinforcing lintols or beams, bent to shape, laid in position and
tied with G.I. wire as directed. MS rods available.

Kg.

38.00

Mild steel rods in reinforcing in foundation bent to shape, laid in position and tied
with G.I. wire as directed. MS rods available.

Kg.

29.00

Tor steel rods in reinforcing lintols or beams, bent to shape, laid in position and
tied with G.I. wire as directed.

Kg.

164.00

Tor steel rods in reinforcing in foundation bent to shape, laid in position and tied
with G.I. wire as directed.

Kg.

155.00

M.S. Bars 16mm dia. supplied and fixed in window frames at 100 centres and
painted with one coat of aluminium or anticorrosive paint and 2 coats of oil paint.

L.m.

326.00

M.S. Bars 20mm dia. supplied and fixed in window frames at 100 centres and
painted with one coat of aluminium or anticorrosive paint and 2 coats of oil paint.

L.m.

446.00

16,170.00

J025

J026

J027

J028

J029

J030

J031

J032

J033

J034

K - BRASS FOUNDER
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 212 of 263

K001

Bolts casement fastners or stays, removed & fixied including making good to
holes in frames & sashes.

No.

71.00

No.

207.00

No.

213.00

Brass barrel bolts, polished 100mm heavy quality supplied & fixed with brass
screws.

No.

338.00

Brass barrel bolts, polished 125mm heavy quality supplied & fixed with brass
screws.

No.

352.00

Brass barrel bolts, polished 150mm heavy quality supplied & fixed with brass
screws.

No.

352.00

Casement fastners, brass with mortice plate polished heavy quality supplied &
fixed with brass screws.

No.

208.00

K008

Casement satys, polished 250mm heavy quality supplied & fixed.

No.

277.00

K009

Casement satys, polished 300mm heavy quality supplied & fixed.

No.

305.00

K010

Fanlight catches brass heavy quality, with brass screws fixed complete.

No.

312.00

K011

Brass Door Handles polished, heavy quality supplied & fixed with brass screws.

No.

554.00

Hasp & staple, safty type 150mm brass polished, heavy quality supplied & fixed
with brass screws complete.

No.

289.00

Hasp & staple, safty type 100mm brass polished, heavy quality supplied & fixed
with brass screws complete.

No.

187.00

Butt hinges 50mm brass polished, heavy quality supplied & fixed with brass
screws complete.

No.

183.00

Butt hinges 75mm brass polished, heavy quality supplied & fixed with brass
screws complete.

No.

247.00

Butt hinges 87.50mm brass polished, heavy quality supplied & fixed with brass
screws complete.

No.

414.00

Butt hinges 100mm brass polished, heavy quality supplied & fixed with brass
screws complete.

No.

470.00

Butt hinges 125mm brass polished, heavy quality supplied & fixed with brass
screws complete.

No.

596.00

Hinges centre pivot (closing of 2 pieces) brass polished, heavy quality supplied &
fixed with brass screws complete.

No.

249.00

K002

K003

K004

K005

K006

K007

K012

K013

K014

K015

K016

K017

K018

K019

Bolts barrel, Brass 62mm" heavy quality supplied & fixed with brass screws.

Bolts barrel, polished 75mm heavy quality supplied & fixed with brass screws.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 213 of 263

K020

Gravity Hinges brass supplied & fixed with brass screws complete.

No.

652.00

K024

Hinges supplied by Department fixed complete with brass screws.

No.

201.00

K025

Knobs for door locks, polished brass heavy quality renewed wirh brass screws.

No.

285.00

K026

Locks, door available fixed with screws.

No.

222.00

K027

Locks, door repaired and re - fixed.

No.

541.00

K028

Locks, cupboard 62mm brass 4 levers with brass screws fixed complete.

No.

293.00

K029

Locks, cupboard repaired and re-fixed.

No.

342.00

K030

Locks, bird night latch supplied and fixed with complete keys.

No.

1,177.00

K031

Locks mortice (Local) single lever supplied & fixed

No.

1,225.00

K032

Locks mortice (Local) double lever supplied & fixed

No.

3,762.00

K033

Locks mortice Union (English) single lever supplied & fixed.

No.

3,990.00

K034

Locks mortice Union (English) double lever supplied & fixed

No.

5,016.00

K035

Ring brass 45mm to 38mm supplied and fixed to doors and windows with brass
screws.

No.

176.00

L - PLASTERER
L001

16mm thick 1:1:5 cement lime plastering & finished smooth - Ground floor.

Sq.m.

391.00

L002

16mm thick 1:1:5 cement lime plastering & finished smooth - First floor.

Sq.m.

419.00

L003

16mm thick 1:1:5 cement lime plastering & finished smooth - Second floor.

Sq.m.

429.00

L004

16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm
wide & finished smooth - Ground floor.

L.m.

104.00

16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm
wide & finished smooth - First floor.

L.m.

108.00

16mm thick 1:1:5 cement lime plastering in narrow widths no exceeding 150mm
wide & finished smooth - Second floor.

L.m.

110.00

L005

L006

L007

15mm thick 2:5 lime plastering & finished smooth.

Sq.m.

468.00

L008

16mm thick 1:3 cement plastering & finished smooth. - Ground floor.

Sq.m.

391.00

L009

16mm thick 1:3 cement plastering & finished smooth. - First floor.

Sq.m.

413.00

L010

16mm thick 1:3 cement plastering & finished smooth. - Second floor.

Sq.m.

429.00

L011

16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide &
finished smooth - Ground floor.

L.m.

135.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 214 of 263

L012

L013

16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide &
finished smooth - First floor.

L.m.

140.00

16mm thick 1:3 cement plastering in narrow widths no exceeding 150mm wide &
finished smooth - Second floor.

L.m.

140.00

L014

65mm x 65mm cove moulding build in existing walls in 1:2 cement mortar.

m.

191.00

L015

Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after
chipping.

m.

9.00

75 x 12mm dado moulding in walls in 1:1:4 cement mortar only for replacement to
match existing to be extra over rate for plastering.

m.

128.00

100mm x 50mm dado moulding 100mm x 50mm in cement & sand 1:2 built in
existing wall.

m.

391.00

Laying of flashing or plaster bands over tiles 100mm to 150mm wide on roof in
1:1:4 cement and lime mortar.

m.

125.00

Letters embossed in plaster 20mm thick 150mm high in cement & sand 1:2
cement floated & painted.

m.

46.00

L020

1:2 cement plastering flush in surface cracks including & raking & joints.

m.

83.00

L021

Pointing, truck, projected in cement 1:2 on brick masonry etc.

Sq.m.

720.00

L022

12mm thick 1:2 cement rendering above 10 m2.

Sq.m.

384.00

L023

12mm thick 1:2 cement rendering up to 10 m2

Sq.m.

437.00

L024

12mm thick 1:3 cement rendering above 10 m2

Sq.m.

344.00

L025

12mm thick 1:3 cement rendering up to 10 m2

Sq.m.

397.00

L026

20mm thick 1:2 cement rendering above 10 m2

Sq.m.

539.00

L027

20mm thick 1:2 cement rendering up to 10 m2

Sq.m.

609.00

L028

20mm thick 1:3 cement rendering above 10 m2

Sq.m.

493.00

L029

20mm thick 1:3 cement rendering up to 10 m2

Sq.m.

563.00

L030

Colour cement floating coat in rendering using red cement (colouring) & finish
smooth.

Sq.m.

109.00

L031

20mm thick 1:2 cement rendering with 5% pudlo cement

Sq.m.

632.00

L032

Skirting in cement mortar 1:3 12mm x 150mm projected or flush with wall,
including forming groove.

m.

227.00

Skirting in cement mortar 1:3 12mm x 150mm projected or flush with wall,
including forming groove.

m.

227.00

L016

L017

L018

L019

L033

L034

10mm thick plastering to RCC beam & slab soffit in cement & sand 1:3 including
floating with lime putty.
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 215 of 263

10mm thick plastering to RCC beam & slab soffit in cement & sand 1:3 including
floating with lime putty.

m.

563.00

20mm thick 1:2 cement & sand DPC & finished smooth with 2 coats of hot tar
blinded with coarse sand.

Sq.m.

677.00

m.

682.00

m.

253.00

M003 Cleaning of Gutter, eaves and down pipes in single storied buildings.

m.

12.00

M004 Cleaning of Gutter, eaves and down pipes in two storied buildings

m.

18.00

M005 Re - grating gutter eaves in single storied buildings.

m.

15.00

Sq.m.

23.00

L035

M - TINKER
M001 450mm wide G.I. Flashing G.I. 22 BWG fixed with 150mm turned up along and
top edge tucked well in to wall in cement lime mortar including removal of old
flashing.
M002 Re-fixing G.I. Flashing including making good to walls in cement and lime mortar.

M006 Re - grating gutter eaves in two storied buildings.


M007 Gutters, Parapet G.I. BWG 900mm wide renewed on existing boards, joints
soldered & laid complete.

m.

1,213.00

M008 22 BWG 900mm wide valley gutter renewed on existing boards sheets tarred,
joints soldered & cement lime filleting complete.

m.

1,412.00

m.

583.00

m.

4,005.00

thick boarding sheet tarred joints soldered & cement lime filleting complete.

m.

4,205.00

M012 Fixing of square 114mm PVC eaves gutters with PVC brackets & brass screws at
450mm intervals including necessary moulded fitting.

m.

1,826.00

M013 Fixing of 87mm dia PVC down pipes with wooden plug including all necessary
moulded fittings.

m.

1,272.00

M009 22 BWG 900mm wide valley gutter renewed on existing boards sheets tarred,
joints soldered & cement lime filleting complete (G.I. Sheet supplied by client).
M010 G.I. 900 mm overall 22 BWG prapet gutters renewed including timber 25mm
boarding joints soldered & laid complete.
M011

G.I. 900 mm overall 22 BWG parapet gutters renewed including timber 25mm

N - GLAZIER
N001

Glass panes fixed with special upper beading (Glass supplied by Dept.)

Sq.m.

1,974.00

N002

Glass panes 3mm, clear supplied & fixed with special class beading.

Sq.m.

3,146.00

N003

Glass panes 3mm figured supplied & fixied with sp.cl. Beading.

Sq.m.

3,077.00

N004

Glass panes 3mm Tinted supplied & fixied with sp.cl. Beading.

Sq.m.

3,323.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 216 of 263

N005

Glass panes 5mm Tinted glass supplied & fixied with sp.up. Beading.

Sq.m.

2,390.00

N006

Glass panes 5mm plane glass supplied & fixied with sp.up. Beading.

Sq.m.

2,185.00

N007

Painted removed from painted glass panes with caustic soda solution or other
paint remover.

Sq.m.

311.00

One coat of cement washing to walls of single storied buildings, patching and
preparing surface.

Sq.m.

25.00

Two coats of cement washing to walls of single storied buildings, patching and
preparing surface.

Sq.m.

43.00

Lettering 25mm to 50mm painted in Tamil, English or Sinhala including painting


ground.

No.

33.00

Lettering 50mm to 75mm painted in Tamil, English or Sinhala including painting


ground.

No.

33.00

Lettering 100mm to 125mm painted in Tamil, English or Sinhala including painting


ground.

No.

33.00

P - PAINTER & DECORATOR


P001

P002

P003

P004

P005

P006

Painting the matal surface with one coat of Dulux bright aluminium paint.

Sq.m.

134.00

P007

Painting one coat of Dulax gloss finish includig washing cearing and smoothing
down with sand paper.

Sq.m.

131.00

Painting two coats of Dulax gloss finish includig washing cearing and smoothing
down with sand paper.

Sq.m.

290.00

Painting new wood work with Dulux wood Aluminium primer and 2 coats of Dulux
Gloss finish.

Sq.m.

433.00

P010

Painting new wood work with one coat of Dulux wood Aluminium primer.

Sq.m.

156.00

P011

Painting steel work 1 coat of Dulux Bituchem Anticorrosive paint including


removing scale and wire brushing.

Sq.m.

137.00

Painting steel work 2 coats of Dulux Bituchem Anticorrosive paint including


removing scale and wire brushing.

Sq.m.

253.00

P013

Painting walls with Dulux Acrylic wall filler where necessary.

Sq.m.

98.00

P014

Paiting walls with 1 coat of Pentalite Plus Emulsion paint including preparing
surface of new work.

Sq.m.

112.00

Paiting walls with 2 coats of Pentalite Plus Emulsion paint including preparing
surface of new work.

Sq.m.

205.00

Paiting walls with 1 coat of Pentalite Plus Emulsion paint including preparing
surface of old work.

Sq.m.

120.00

Paiting walls with 2 coats of Pentalite Plus Emulsion paint including preparing
surface of old work.

Sq.m.

213.00

P008

P009

P012

P015

P016

P017

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 217 of 263

P018

Applyingof one coat of tar nap or other wood preservative to new wood work.

P019

Applyingof two coats of tar nap or other wood preservative to new wood work.

Sq.m.

176.00

Sq.m.

318.00

Varnishing with 1 coat of Dulux polyurethane varnish after washing down & sand
papering.

Sq.m.

193.00

Varnishing with 2 coats of Dulux polyurethane varnish after washing down & sand
papering.

Sq.m.

324.00

P022

Removeing existing vanishing to bare timber and preparing surface.

Sq.m.

165.00

P023

Scraping and removeing soot on wall and leveling internaly in kitchen (extra over
colour washing).

Sq.m.

130.00

Scraping of walls to original plaster, sand preparing and lime putting cracks and
defecting preparing surface for new application of distemper, snowcem, emulsion
paint or similar.

Sq.m.

33.00

white washing or colour washing wall with one coat of single storied building
including patching and preparing surface.

Sq.m.

20.00

white washing or colour washing wall with two coats of single storied building
including patching and preparing surface.

Sq.m.

43.00

white washing or colour washing external wall with one coat in two storied
buildings.

Sq.m.

29.00

white washing or colour washing external wall with one coat in building of more
than two storied.

Sq.m.

31.00

white washing or colour washing external wall with two coats in two storied
buildings.

Sq.m.

53.00

white washing or colour washing external wall with two coats in buildings of more
than two storied.

Sq.m.

54.00

Walls internal faces scraped to original plaster patching up cracks and defects
lime puttying sand papering applying plaster of Paris and preparing surface for
application of emulsion paint or enamel paint.

Sq.m.

173.00

Walls external faces scraped to original plaster patching up cracks and defects
and preparing surface including sand papering for application of snowcem or
white washing in single storied building.

Sq.m.

154.00

Walls external faces scraped to original plaster patching up cracks and defects
and preparing surface including sand papering for application of snowcem or
white washing in two storied building.

Sq.m.

174.00

Walls external faces scraped to original plaster patching up cracks and defects
and preparing surface including sand papering for application of snowcem or
white washing in more than two storied building.

Sq.m.

187.00

P020

P021

P024

P025

P026

P027

P028

P029

P030

P031

P032

P033

P034

P035

Painting walls with 1 coat of Dulux weather shield paint including preparing
surface of new work.
275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 218 of 263

Painting walls with 1 coat of Dulux weather shield paint including preparing
surface of new work.

Sq.m.

126.00

Painting walls with 2 coats of Dulux weather shield paint including preparing
surface of new work.

Sq.m.

224.00

Painting walls with 1 coat of weather shield paint including preparing surface of
old work.

Sq.m.

134.00

Painting walls with 2 coats of weather shield paint including preparing surface of
old work.

Sq.m.

231.00

P039

Painting floors with 1 coat of Dulux floor paint including preparing surface.

Sq.m.

138.00

P040

Painting floors with 2 coats of Dulux floor paint including preparing surface.

Sq.m.

251.00

P041

Painting floors with 1 coat of Dulux Epoxy floor paint including preparing surface.

Sq.m.

156.00

Sq.m.

288.00

Painting to MS bar for windows 1 coat of Dulux bituchem anticorrosive paint and 2
coats of Dulux Gloss finished including preparing surface.

L.m.

60.00

Painting to MS bar for windows 2 coats of Dulux bituchem anticorrosive paint and
1 coat of Dulux Gloss finished including preparing surface.

L.m.

58.00

P036

P037

P038

P042

P043

P044

P045

Painting floors with 2 coats of


surface.

Dulux Epoxy floor paint including preparing

Painting to MS bar for windows 2 coats of Dulux Gloss finished including


preparing surface.

48.00

Q - PLUMBER
Q001

Ball valve 20mm supplied & fixed.

No.

256.00

Q002

Ball valve 25mm supplied & fixed.

No.

370.00

Q003

Ball valve 32mm supplied & fixed.

No.

446.00

Q004

Ball valve 40mm supplied & fixed.

L.m.

449.00

Q005

Ball valve 20mm to 32mm fixed (valve supplied by Dept.)

No.

117.00

Q006

Ball valve repaired & fixed.

No.

317.00

Q007

Basin, lavatory fixied to wall and connected to exisiting water service & making
good (basin, brackets & fittings supplied by Dept.)

No.

2,006.00

Basin, lavatory fixied on existing brackets (tap waste trap & basing supplied by
Dept.)

No.

997.00

No.

4,485.00

Q008

Q009

Basin, lavatory white medium (550x440mm round/sq) with 1 tap waste plugs, new
brackets supplied and fixied complete (additional tap, trap paid for seperately).

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 219 of 263

Q010

Q011

-do-do-do-

Q012

-do-

Q013
Q014

-do-

Supplied and fixed existing brackets -do-

-do-

.
-do-do-.

No.

(625x45mm large) with new brackets

-do-

-do-

3,078.00

-do-

Sq.m.

370.00

No.

5,078.00

Basin sink or urinal including all fittings removed and walls made good.

No.

997.00

Baths C.I. Enamel removing & re-fixing in new position & making good to walls &
floors ( extra piping required paid separately.)

No.

7,338.00

Closet pedestal type available at site, fixed with cement conc. after breaking conc.
floors & making good & making connection to soil and flush pipes.

No.

1,795.00

Closet pedestal type, disconnecting & plugging sewer connection & making good
all affected walls & floors..

No.

1,256.00

No.

4,662.00

No.

8,757.00

No.

3,815.00

No.

3,245.00

No.

1,822.00

Closet squatting type fixed, including breaking floor & fixed in cement concrete
(closet supplied by Dept.)

No.

1,806.00

Closet squatting type fixed, including flushing cistern & pipes complete (closet
and all fittings supplied by Dept.)

No.

4,203.00

Q024

Cock , brass bib 20mm supplied & fixed.

No.

647.00

Q025

Cock , brass any size bib flush or stop cock 20mm to 50mm removed.

No.

39.00

Q026

Cock bib , or stop repaired by fixing leather washers.

No.

125.00

Q027

Seat & cover for pedestal closet in plastic supplied & fixed.

No.

949.00

Q028

Flushing cistern cleaned & paint one coat of anticorrosive paint internally.

No.

64.00

Q029

Flushing cistern cast Iron 9 Lit. excluding flush pipe, brackets & including ball
valve supplied & fixed.

No.

2,332.00

Flushing cistern fixed complete (cistern & brackets supplied)

No.

1,329.00

Q015

Q016

Q017

Q018

-do-

on existing brackets -do-

-do-

-do-

Closet only pedestal type supplied and fixed (Hardwood seat & cover available)

Closet pedestal type, with low level (Plastic) flushing cistern flush pipe double
plastic seat cover 20mm stop cock trap etc. supplied & fixed complete.

Q019

Q020

Q021

Q022

Q023

Q030

Closet squatting type large with trap with supplied & fixed squatting pan & trap.

Closet squatting type medium with trap with supplied & fixed squatting pan & trap.

Closet squatting type removed sewer connection plugged & floor made good.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 220 of 263

Q031

Flushing cistern low level, plastic supplied & fixed complete.

No.

2,853.00

Q032

Flushing cistern, level forged out of wrought Iron 25x4.5mm approx 450mm long
bent to shape, drilled at both ends & fitted in position in cistern.

No.

1,318.00

Flushing cistern, disconnecting and plugging water connection making good all
damage to walls, floors etc.

No.

1,014.00

Flushing cistern, removing and re-fixing in new position including necessary plugs
& making good to walls.

No.

2,344.00

Mirror, bellowed, bathroom type 500x450mm supplied & fixed to wall with rawl
plugs & chromium plated fittings.

No.

1,197.00

Q036

Piller cock fixed in basin carefully repaired without damage to basin.

No.

1,767.00

Q037

Piller cock 20mm chromium plated supplied and fixed to basin.

No.

1,772.00

Q038

Shower rose, any size fixed (shower rose supplied by Dept.)

No.

115.00

Q039

Shower rose, soldered and re-fixed.

No.

233.00

Q040

Sink any size fixed complete with waste plug tap & brackets (sink & fittings
supplied by Dept.)

No.

1,410.00

Sink glazed earthenware 61x39x19.5 cm fixed with waste plug brackets etc.
complete.

No.

5,642.00

Sink stainless steel (double board) fixed with waste plug, 112mm brick wall
support and 1:3 cement sand plastering.

No.

11,486.00

Q043

Sink

No.

5,226.00

Q044

Sink stainless steel (single board) supplied & fixed with waste plug, 112mm brick
wall support and 1:3 cement sand plastering.

No.

6,741.00

Ceramic lab sing coloured 46x37.5x18 cm supplied & fixed with waste plug,
brackets etc.

No.

5,414.00

Q046

Sink

No.

3,705.00

Q047

Sink or basin, removed & refixed in new position.

No.

3,003.00

Q048

Sink built in cement 1:5 and cement rendered 12mm (1:2) 600x600mm 150mm
high curb including making hall in wall & supplying & fixing 63mm outlet pipe.

No.

4,240.00

Q049

Soap tray white porcelain, supplied & fixed to wall with rawl plugs.

No.

923.00

Q050

Stop cock brass 20mm , supplied & fixed (with Italy made)

No.

270.00

Q051

Stop cock brass 25mm , supplied & fixed (with Italy made)

No.

378.00

Q052

Stop cock brass 32mm , supplied & fixed (with Italy made)

No.

402.00

Q053

Stop cock brass 40mm , supplied & fixed (with Italy made)

No.

629.00

Q033

Q034

Q035

Q041

Q042

Q045

-do-

-do-

-do-

-do-

-do-

on existing supports.

fixed on existing supports.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 221 of 263

Q054

Stop cock brass 50mm , supplied & fixed (with Italy made)

No.

665.00

Q055

Stop cock brass 63mm , supplied & fixed (with Italy made)

No.

1,268.00

Tooth brush holder chromium plated supplied & fixed to wall with rawl plug.

No.

798.00

Q057

Towel rail, chromium plated supplied & fixed to wall with rawl plug.

No.

793.00

Q058

Toilet paper holder 150mm x 150mm (ceremic cop.)

No.

651.00

Q059

Urinal, wall type supplied & fixed.

No.

6,217.00

Q060

Urinal, wall type available fixed.

No.

1,885.00

Q061

Bends, Elbows & tees & other specials of PVC sizes up to 90mm fixed (fittings
supplied by Dept.)

No.

80.00

Q062

Bends PVC sizes up to 20mm supplied & fixed.

No.

102.00

Q063

Bends PVC 25mm supplied & fixed.

No.

109.00

Q064

Bends PVC 32mm supplied & fixed.

No.

122.00

Q065

Bends PVC 40mm supplied & fixed.

No.

164.00

Q066

Forming bends or jointing pipes by heating without fixing special in rigid PVC
40mm to 63mm (pipe supplied by Dept.)

No.

54.00

Forming bends or jointing pipes by heating without fixing special in rigid PVC
75mm to 90mm (pipe supplied by Dept.)

No.

104.00

Q068

Pipes PVC 20mm supplied & fixed (Type 1000)

No.

97.00

Q069

Pipes PVC 25mm supplied & fixed (Type 1000)

m.

175.00

Q070

Pipes PVC 32mm supplied & fixed (Type 1000)

m.

314.00

Q071

Pipes PVC 32mm supplied & fixed (Type 600)

m.

205.00

Q072

Pipes PVC 40mm supplied & fixed (Type 1000)

m.

378.00

Q073

Pipes PVC 50mm supplied & fixed (Type 1000)

m.

616.00

Q074

Pipes PVC 40mm supplied & fixed (Type 600)

m.

266.00

Q075

Pipes PVC 50mm supplied & fixed (Type 600)

m.

445.00

Q076

Pipes PVC 63mm supplied & fixed (Type 1000)

m.

959.00

Q077

Pipes PVC 63mm supplied & fixed (Type 600)

m.

661.00

Q078

Closet squatting type large with trap supplied & fixed complete with plastic cistern
flush pipe etc. including 12mm stop cock & specials.

No.

8,302.00

Q079

Suppling and Fixing 150x20mm PVC shower rose.

No.

2,422.00

Q080

Suppling and Fixing plastic seat cover

No.

949.00

Q056

Q067

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 222 of 263

R - DRAIN LAYER
R001

Bends PVC 110mm supplied & fixed (type 600)

No.

1,540.00

R002

Connection to existing sewer or manhole.

No.

1,225.00

R003

Drains PVC 110mm laid on cement conc. 150mm thick up to 600mm depth of
invert including excavation & cement conc. Hunching 1:3:6(40).

m.

1,591.00

Drains PVC 110mm laid on 1:3:6(40) cement conc. 150mm thick depth of invert
over 600mm & up to 1.200mm including excavation & cement conc. hunching &
shorting sides where necessary.

m.

1,782.00

Drains PVC 110mm laid on 1:3:6(40) cement conc. 150mm thick depth of invert
over 1200mm & up to 1800mm including excavation & cement conc. hunching &
shorting sides where necessary.

m.

1,980.00

R006

Grating PVC 150x150mm supplied & fixed.

No.

233.00

R007

Gully PVC 100mm supplied & fixed including gully box.

No.

1,247.00

R008

Gully PVC 150mm available fixed including gully box.

No.

1,173.00

R009

Manhole 600x600mm & unto 600mm deep 225mm thick brick in cement 1:3 walls
& cement rendered 12mm (1:2) with 150mm cement conc. foundation 1:3:6(40)
including forming channels, but without cover.

No.

8,189.00

Manhole 1.050x0.675mm and 0.600mm to 1.200mm deep -do-do-

No.

13,969.00

Manhole 1.050x0.675mm & 1.200mm to 1.800mm deep 225mm thick brick in


cement 1:3 walls & cement rendered 12mm (1:2) with 150mm cement conc.
foundation 1:3:6(40) including forming channels, but without cover.

No.

22,059.00

Manhole cover reinforced 1:2:4(20)conc. 75mm thick 600x600mm approx.


supplied and fixed reinforced 6mm dia. M.S. at 75mm crs. both ways.

No.

1,743.00

Manhole cover reinforced 1:2:4(20)conc. 75mm thick 1050x675mm approx.


supplied and fixed reinforced 6mm dia. M.S. at 75mm crs. both ways.

No.

3,264.00

R014

Tees of junctions 110mm PVC supplied & fixed

No.

1,718.00

R015

Wire domes for 110mm supplied & fixed.

No.

251.00

Fence barbed wire 12 1/2 gauge 4 points 75mm apart supplied & fixed on existing
timber post with G.I. Staples.

m.

32.00

Fence barbed wire -dobolts.

m.

29.00

m.

37.00

R004

R005

R010

R011

R012

R013

-do-

S - MISCELLANEOUS
S001

S002

S003

Fence barbed wire -do-

-do- fixed on existing conc. Posts with available hooks

-do- fixed in renewing short lengths on timber post.

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 223 of 263

S004

-do-

S005

Intermediate fence post or struts, cement conc. 1:2 1/2:3(19) reinforced with 4
Nos. 6mm dia. M.S. rods 1.70 L.m. high square section 100mm to 150mm fixed
complete as per drawing No.68 of
22-7-36

Post

1,208.00

Intermediate fence post or struts, cement conc. 1:2 1/2:3(19) reinforced with 4
Nos. 6mm dia. M.S. rods 2.29 L.m. high square section 100mm to 150mm fixed
complete as per drawing No.68 of
22-7-36

Post

1,374.00

End post and strut for type barbed wire fence fixed complete in cement conc. As
per drawing BSR 6 of 1936

Post

7,723.00

Fence barbed wire 5 strands, 12 1/2 BWG with 4 points at 75mm crs. & RCC
posts 1:2:4(20), reinforced with 4 Nos. 6mm rods with No. 14 BWG stirrups at
200mm crs. posts to be fixed at 2.40m crs. In including excavation cement conc.
Foundation 1:3:6(40) metal to corner posts & struts & straining bolts all as per
type plan No:68, of 22.07.36 struts to be reinforced with 4 Nos. 10mm rods &
conner posts with 4 Nos. 12mm rods.

m.

1,137.00

S009

Straining bolts, 12mm dia made & fixed 0.45 L.m. long (approx.)

m.

630.00

S010

Well bailing out water 1.5 to 2.3 dia. Up to 6.10 m depth including cleaning wall.

S006

S007

S008

S011

-do-

-do- conc. Posts with available hooks bolts.

-do-

6.40 m 9.15 m depth -do-

m.

34.00

Item.

1,111.00

Item.

1,482.00

275544406.xls - DEPARTMENT OF BUILDINGS - RATES SUMMARY - PAGE No: - 224 of 263

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Unskilled
Skilled Gr. I - ( Marble worker, welders, Aluminium worker)

day
hr.
day
hr.

Mason, Carpenter, Plumber, Painter, Balcksmith (Skilled Gr. II)


Mason, Carpenter, Plumber, Painter, Balcksmith (Skilled Gr. II)

day
hr.

Rubble
50mm Metal
40mm Metal
25mm Metal
20mm Metal
12mm Metal
Bricks
Concrete mixture with vibrator (Including fuel and operator)
Slaked Lime
Boiled Lime
River sand
Earth 27.2 km transport
Gravel 27.2 km transport
Cement Atlas
Cement Mitsui
Cement Sangstha
Coloured Cement
White Cement
Pudlo Cement
Calicut flat tile
Ridge tiles
Tile half round Gr. I
Corrigated asbestos sheet
Asbestos - ridge tiles
Flat asbestos sheet
Tor Steel
Miled Steel (10 to 20)
Miled Steel (6mm)
G.I. Plain sheet - 24 BWG
Timber
Sp.cl.Up.
Sp.cl.
Class I
50mm x 50mm
L.m
118.00
100 x 50
Cu.m
68572.00
150 x 50
Cu.m
66950.00
Planks
175 x 50
Cu.m
68628.00
100 x 75
Cu.m
69704.00
125 x 75
Cu.m
73877.00
150 x 75
Cu.m
68446.00
150 x 100
Cu.m
69821.00
200 x 100
Cu.m
83821.00 56800.00
50 x 25
L.m
37.00
33.00
50 x 12
L.m
35.00
23.00

Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
No.
Day
Bus.
Bus.
Cu.m
Cu.m
Cu.m
Bag
Bag
Bag
kg
kg
kg
No.
No.
No.
Sq.m
Pair
Sq.m
kg
kg
kg
Sq.m
Class II

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 225 of 263

Sq. m

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

Planks
38mm
Sq.m
2500.00
31mm
Sq.m
1284.00
28mm
Sq.m
1844.00
25mm
Sq.m
1643.00
20mm
Sq.m
1314.00
12mm
Sq.m
788.00
Corrigated G.I. sheet 24BWG
12 x 12 mm Sp.Cl. Timber Fillets (Beading)
12 x 12 mm Halmila Timber Fillets
16 x 16 mm Sp.Cl. Timber Fillets
20 x 20 mm Sp.Cl. Timber Fillets
28 x 28 mm Sp.Cl. Timber Fillets
32 x 12 mm Sp.Cl. Timber Fillets
40 x 50 mm x 12mm,Sp.Cl. Timber Fillets
40 x 40 mm Sp.Cl. Sash bars
Cove Molding 63mm x 40mm
Lunumidella 150 x 12 mm
Lunumidella 150 x 16 mm
Lunumidella 150 x 20 mm
Ply Wood 12mm Lakply
Ply Wood Door 2' 3" x 6' 9" Lakply
Ply Wood Door 2' 9" x 6' 9" Lakply
Ply Wood Door 3' 6" x 6' 9" Lakply
Ply Wood 3 ply Sheet
Ginisappu Planks 1"
Beading 25mm
Beading 31mm
Hard Board 6mm
Chip Board 10mm
Chip Board 12mm
Shuttering Planks WBP Board
Beading 12x12mm
Tor Steel with bininding
MDF Board 12mm Sheet
MDF Board 16mm Sheet
Ginisuppu Planks
Aluminium Knobs 1"
Aluminium Knobs 3/4"
Aluminium Beading 1"
Aluminium Bar - SPR 4517
Aluminium Bar - SPR 107
Aluminium Bar - PT 5157
Aluminium Bar - PT 5158
Aluminium Bar - PT 5153
Aluminium Bar - 70S 1201-1
Aluminium Bar - 70S 1503A
Aluminium Bar - 70S 1704
Aluminium Bar - 70S -1704A

Sq.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
Sq.m
Sq.m
Sq.m
Sq.m
No.
No.
No.
Sq.m
Sq.m
L.m
L.m
Sq.m
Sq.m
Sq.m
Sq.m
L.m
kg
No.
Sq.m
No.
No.
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 226 of 263

99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

Aluminium Bar - 70S-1401-1


Aluminium Bar - 70S-1604
Aluminium Bar - 70S-1002-1
Aluminium Bar - 70D-1910
Aluminium Bar - CA-1007
Aluminium Bar - CA 2004
Aluminium Bar - CA -1008
Aluminium Bar - GL -107
Aluminium pannel
Aluminium box Bar 4"x2" SPR 4515
Aluminium Corrugated Sheet
Aluminium Sheet Guaqe 20
Aluminium Tower Bolt 50mm
Aluminium Tower Bolt 75mm
Aluminium Tower Bolt 100mm
Aluminium Hinges 75 x 50
Aluminium Hinges 100 x 62
Aluminium Hinges 100 x 75
Alpha Locks Dobule
Aluminium Door Closer
Aluminium Angles 25 x 25
Aluminium Ribets

L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
Sq.m
L.m
Sq.m
Sq.m
No.
No.
No.
Pair
Pair
Pair
No.
No.
L.m
No.

Barrel bolts (Steel oxi) 100


Barrel bolts (Steel oxi) 150
Barrel bolts (Steel oxi) 200
Barrel bolts (Brass) 62mm
Barrel bolts (Brass) 75mm
Barrel bolts (Brass) 100mm
Barrel bolts (Brass) 125mm
Barrel bolts (Brass) 150mm
Casement fastner Steel oxi
Casement stays Steel oxi 250
Casement stays Steel oxi 300
Door rings Steel 125mm dia
Door rings Steel oxi 150mm dia
Door Handle (Brass)
Door Knobs per set
Butt hinges Steel oxi 100 x 50
Butt hinges Steel oxi 100 x 75
Butt hinges Steel oxi 100 x 100
Butt hinges Steel oxi 125 x 125
Butt hinges Steel oxi 150 x 150
Hinges Brass 50mm

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Pair
Pair
Pair
Pair
Pair
Pair

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 227 of 263

148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196

Hinges Brass 75mm


Hinges Brass 87mm
Hinges Brass 100mm
Hinges Brass 125mm
Hinges Brass 150mm
Centre pivots set of 4 pieces
Fan light catch Steel
Gravity hinges set 25mm
Hasp and Staple 100mm Steel
Hasp and Staple 150mm Steel
Hasp and Staple 200mm
Hold fast
Cabin Hook 100mm
Cabin Hook 150mm
Cabin Hook 200mm
Hinges "T" Iron Oxi. 250mm
Hinges "T" Iron Oxi. 300mm
Hinges parliamentary brass 125mm
Mortice Lock Union English Double
Mortice Lock Union English Single
Mortice Lock Indian made Volvo Lock
Mortice Lock Golden - Chinese - double
Night Latch Lock Bird brand
Strap Hinges 2" x 1 1/4" x 3' 0"
Spur Stone 100 x 75
Spur Stone 100 x 125
Staples
Cupboard Lock Bird Brand
Skeleteton Bolts - 300mm
Ring - Brass - 45mm - 38mm

Pair
Pair
Pair
Pair
Pair
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Kg.
No.
No.
No.

Ceramic Wash Basin (M) Cloured (Only for wash basin)


Ceramic Wash Basin (M) White Complete set
Ceramic Wash Basin With Pedestal (L) Cloured
Ceramic Wash Basin With Pedestal (L) White
Ceramic Wash Basin Without Pedestal(L)Cloured
Ceramic Wash Basin Without Pedestal(L)White
Ceramic Bidet Cloured (Normal)
Ceramic Bidet White (Arrow brand)
Ceramic Lab Sink Cloured 46 x 32.5 x 18
Ceramic Lab Sink White
Ceramic Vent Cover Cloured
Ceramic Vent Cover White
Ceramic Corner Wash Basin Cloured
Ceramic Corner Wash Basin White
Ceramic Foot Rest Cloured
Ceramic Foot Rest White
Ceramic Robe Hook Cloured

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Pair
Pair
No.

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 228 of 263

197 Ceramic Robe Hook White


198 Chromiun plated Soap Holder
199 Plastic bede shower
200 Chromiun plated bede shower

No.
No.
No.
No.

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245

Chromiun plated Toilet Paper Holder


Flaxible hose 1 1/2"
Chromiun plated Tooth Brush Holder
Chromiun plated Towel Rack Holder
Chromiun plated Towel Rack Holder
Commode & Ceramic Cistern Set white
Commode & ceramic Cistern Set coloured
Commode
Commode with plastic seat colour
Commode with plastic seat white
Plasitic seat cover
Chromium plated cock 20mm (piller cock)
Glazed tiles 300 x 300 non skid
Glazed tiles 300 x 300 Colour
Glazed tiles 200 x 200 White
Glazed tiles 200 x 300 Colour
Glazed tiles 400 x 400 Colour
Non skid Tiles 200x200
Flushing cistern complete- ceramic white
Flushing cistern complete- ceramic coloured
Flushing cistern complete- Plastic
Mirror 16" x 22"
Soap Tray Cromium Plated
Squatting pan Large Ceylon Ceramic & Trap
Towel rail Chromium Plated 2' 0" x 3/4"
Tooth Brush Holder Chromium Plated
Terrazzo Tiles 300 x 300 mm
Urinal Walltype Ceylon Ceramic (complete set)
Wash Basin Brakcets
Sink Stain less steel
Sink Stain less Steel Double board
Sink Stain less Steel Single board
Squatting pan medium Ceylon Ceramic & Trap

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

Amano Sheet 0.40mm


Amano Sheet 0.47mm
Angle Iron 2" x 2" x 10 mm
Angle Iron 2 1/2" x 2 1/2" x 10 mm
Angle Iron 3" x 3" x 10 mm
Angle Iron 4" x 4" x 10 mm
Flat iron 1/2" x 1/4"
Flat iron 5/8" x 1/4"
Flat iron 3/4" x 1/4"
Flat iron 1" x 1/4"

Sq.m.
Sq.m.
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 229 of 263

246
247
248
249
250
251
252
253
254
255
256
257
258

Flat iron 1 1/2" x 1/4"


Flat iron 2" x 1/4"
Fan Hook
Box Iron 1" x 1"
Box Iron 3/4" x 3/4"
"L" Iron 1 1/2" x 1 1/2"x 6 mm
"L" Iron 1" x 1"x 6 mm
"L" Iron 2 1/2" x 2 1/2"x 6 mm
"L" Iron 2" x 2"x 6 mm
"L" Iron 3" x 3"x 6 mm
"L" Iron 3/4" x 3/4"x 6 mm
"H" Iron 6" x 3" x 3/8"
"H" Iron 8" x 4" x 3/8"

259
260
261
262 G.I. Corrugated Sheet B.W.G. 30
263 G.I. Clout Nails
264 G.I. Hook bolts + Nuts 6" - 8"
265 G.I. Hook bolts 5/16" x 4 1/2"
266 G.I. Pipe 1/2" dia Heavy
267 G.I. Pipe 1 1/2" dia Heavy
268 G.I. Pipe 1 1/4" dia Heavy
269 G.I. Pipe 1" dia Heavy
270 G.I. Pipe 2" dia Heavy
271 G.I. Pipe 3/4" dia Heavy
272 G.I. Pipe 4" dia
273 G.I. Pipe 6" dia
274 G.I. Sheet Guage 26
275 G.I. Sheet Guage 24
276 G.I. Union 1 1/2" dia
277 G.I. Union 1 1/4" dia
278 G.I. Union 1" dia
279 G.I. Union 2" dia
280 G.I. Union 3/4" dia
281 G.I. Weldmesh 2" x 2" Guage 10
282 Chicken mesh 22 Guage
283 Barbed wire B.W.G. 14
284 Welded Wire Mesh 1 1/2" x 1 1/2" 14 G
285 Welded Wire Mesh 1" x 1" 16 G
286 Welded Wire Mesh 1" x 1" 18 G
287 Welded Wire Mesh 1/2" x 1/2" 18 G
288 Welded Wire Mesh 1/2" x 1/2" 20 G
289 Welded Wire Mesh 2" x 2" 12 G (12' x 7' )
290 Welded Wire Mesh 2" x 2" 12 G (2m x 7.5m)
291 Welded Wire Mesh 3" x 3" 18G
292 Welded Wire Mesh 3/4" x 3/4" 16 G
293 Welded Wire Mesh 3/4" x 3/4" 18 G
294 12mm Bolt & Nuts

L.m
L.m
No.
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m

L.m
kg
kg
kg
L.m
L.m
L.m
L.m
L.m
L.m
No.
No.
Sq.m
Sq.m
No.
No.
No.
No.
No.
Sq.m
L.m
L.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
No.

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 230 of 263

295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343

Glass
Glass
Glass
Glass
Glass

Pans
Pans
Pans
Pans
Pans

3mm
3mm
5mm
3mm
5mm

Figured
Tinted
Tinted
Plain
Plain

P.V.C. Pipe
20mm
25mm
32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm

Sq.m
Sq.m
Sq.m
Sq.m
Sq.m

L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m
L.m

T1000
T600
T400
48.50
107.25
160.00
84.00
237.00
165.00
341.00
221.00
157.00
576.00
367.00
285.00
1180.00
724.00
459.00
1426.00
915.00
622.00
2132.00 1341.00
652.00
3532.00 2148.00

Draniage pipe 110mm T250


Draniage pipe 160mm T250

L.m
L.m

Fittings
Eq.Sock. Elbow
Eq.Tee
Val.Sock. Fauc.Soc.
20mm 1/2"
16.00
15.00
20.00
20.00
20.00
25mm 3/4"
23.00
27.00
36.00
28.00
28.00
32mm 1"
34.00
40.00
55.00
32.00
36.00
40mm 1 1/4"
51.00
66.00
90.00
60.00
67.00
50mm 1 1/2"
78.00
111.00
156.00
83.00
92.00
63mm 2"
125.00
187.00
238.00
138.00
143.00
75mm 2 1/2" 308.00 404.00
395.00
373.00
264.00
90mm 3"
453.00 683.00
903.00
578.00
404.00
110mm 4"
727.00 756.00
1354.00
906.00
906.00
140mm 5"

20mm
25mm
32mm
40mm
50mm
63mm
75mm
90mm

25 x 20

Foot
stop
valve
cock pvc.
519.75
94.50
577.50
189.00
703.50
210.00
1575.00 409.50
1890.00
441.00
2730.00
651.00

Italybrass

Bend
26.00
36.00
51.00
111.00
178.00
288.00
824.00
1328.00
1746.00

wheel
wheel
valve brass valve pvc gate valve

Reducing Reducing
socket
elbow
16.80

Reducing
tee
28.35

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 231 of 263

344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392

32 x 20
32 x 25
40 x 20
40 x 25
40 x 32
50 x 20
50 x 25
50 x 32
50 x 40
63 x 20
63 x 32
63 x 40
63 x 50
75 x 40
75 x 50
75 x 63
90 x 50
90 x 63
90 x 75
110 x 20
110 x 32
110 x 50
110 x 63
110 x 90

20mm
25mm
32mm
40mm
50mm
63mm
75mm
90mm
110mm
140mm

19.95
25.20
32.55
35.70
42.00
43.05
49.35
57.75
61.95
73.50
77.70
81.90
84.00

36.75
42.00
50.40
63.00
65.10
73.50
84.00
93.45
106.05
162.75
168.00
170.10
178.50

PVC Bend
18.90
25.20
36.75
73.50
116.55
189.00
588.00
976.50
1249.50

Cast Iron cistern


Leather washer
Plastic Bib Tap 1/2"
Plastic Bib Tap 3/4"
Solvent Cement
Tap Brass 1/2" dia
Tap Brass 3/4" dia
Choromium plated shower Rose
P.V.C. Square Gutter 4 1/2"- 12 Ft Lgth
P.V.C. Gutter Bracket
P.V.C. Gutter BOX

No.
No.
No.
No.
50g.
No.
No.
No.
L.m
No.
No.

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 232 of 263

393 P.V.C. Gutter Joiner


394 P.V.C. Mitre Joiner
395 P.V.C. Gutter End Cap Left
396 P.V.C. Gutter End Cap Right
397 P.V.C. Down Spout Head Small
398 P.V.C. Down Spout Head Large
399 P.V.C. Running Head
400 P.V.C. Down Pipe 3 1/2" - 12 Ft Lgth
401 P.V.C. Down Pipe Elbow
402 P.V.C. Down Pipe Joiner.
403 P.V.C. Down Pipe Clip (Fab)
404 P.V.C. Drainage Gully Dish & Grate
405 P.V.C. Floor Trap (4 Way-40 mm)
406 P.V.C. Bottle Trap
407 P.V.C. Clmp. Shaddle 110 x 20 mm (clips)
408 P.V.C. Clmp. Shaddle 110 x 25 mm
409 P.V.C. Tapered Core 63 mm
410 P.V.C. Flared Mouth
411 P.V.C. Vent Cowl 110 mm
412 P.V.C. Grating 6" x 6"
413 P.V.C. Conduit Pipe 16 mm 5/8"
414 P.V.C. Conduit Pipe 20 mm 3/4"
415 P.V.C. Conduit Pipe 25 mm 1"
416 P.V.C. Conduit Pipe 32 mm 1 1/4"
417 P.V.C. Conduit Pipe 40 mm 1 1/2"
418 P.V.C. Conduit Pipe 50 mm 2"
419 P.V.C. Conduit Bend 16 mm 5/8"
420 P.V.C. Conduit Bend 20 mm 3/4"
421 P.V.C. Conduit Bend 25 mm 1"
422 P.V.C. Pipe (400)
423
424
2"
425 Bolts + Nuts 4" x 3/8" dia
426 Bolts + Nuts 5/8" dia 9" long
427 Bolts + Nuts 10mm x 150mm
428 Bolts + Nuts 10mm x 225mm
429 Bolts + Nuts 10mm x 75mm
430 Bolts + Nuts 6mm x 45mm
431 Bolts + Nuts 3/8" dia 18" long
432 Bolts + Nuts 3/8" dia x 2" long
433 Screws Brass 1 1/4" x 9
434 Screws Brass 2 1/4" x 9
435 Screws Brass 1 1/2" x 9
436 Screws Brass 1 3/4" x 9
437 Screws Brass 1" x 9
438 Screws Brass 2 1/2" x 9
439 Screws Brass 2" x 9
440 Screws Brass 3" x 9
441 Screws Brass 3/4" x 9

No.
No.
No.
No.
No.
No.
No.
L.m
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
L.m
L.m
L.m
L.m
L.m
L.m
No.
No.
No.
L.m

kg
kg
kg
kg
kg
kg
kg
kg
No.
No.
No.
No.
No.
No.
No.
No.
No.

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 233 of 263

442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490

Screws Iron 1 1/2" x 10


Screws Iron 1 1/4" x 10
Screws Iron 3/4" x 10
Screws Iron 1" x 10
Screws Iron 2 1/2" x 10
Screws Iron 2" x 10
Screws Iron 3" x 10
Screws Iron 1/2" x 6
Straining Bolts
Tee Iron Brackets
Roofing Scrwes
Wire dome

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No

Wood Preservative (Lankam)


Wood Preservative C.I.C.
Thinner
Samara
Yellow Ochre
Aluminium wood primer
Anticrossive Paint
Acrylic wall Filler
Paint Brillient White Enamel
Paint Emulsion
Paint Enamel
Paint Epoxy
Paint Varnish
Paint Weather Shield
Floor Paint
Caustic soda
Sand Paper No. 0
Sand Paper No. 1
Sand Paper No. 2
Glue
Bright aluminium paint
Paint Brillient White Emulsion

Ltr
Ltr
Ltr
kg
kg
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
kg
No.
No.
No.
kg
Ltr
Ltr

Binding wire
Basket
Props Bamboo
Timber Round Post (10 ft)
Tractor
Wood Plug
Rawl Plug
Limpet washers
Leather washer
Mould oil
Wire Nails 1" - 6"
Bitumen (Tar)

kg
No.
No.
No.
hr
No.
No.
kg
No.
Ltr
kg
Ltr

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 234 of 263

491
492
493
494
495
495
496
497
498

Coald Tar
Cadjans leaves
Clips
D.P.C. Tar
MS Bar
MS Bar
Amonasheet - Eaves gutter with othre accessories
Amonasheet - Down pipe with othre accessories
Amonasheet - Gutter Head

Ltr
No.
No.
Ltr
kg
kg
No.
No.
No.

499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530

Mactorial (Isolater)
Amonasheet - Gutter Bracket, Clips, Etc.
B. I. Sheet 8'x4' - 6mm
B. I. Sheet 8'x4' - 10mm

m2 / m
No.
No.
No.

Pub Rivet
Welding rod
Theroseal
Rawl Plug
Floor tile non skid pattern 100 x 100
Floor tile non skid pattern 150 x 150
Floor tile non skid pattern 200 x 200
Floor tile non skid pattern 300 x 300
10 way MCB with ABC Box-900
Isolator 40 Amp 2 Module four pole
RCCB 40 Amp Crabtree
Earth Electrode - 1.5m - 50mm dia
Ceiling Fan "Bajaj" 1400mm (sweep) Reg AC
Florescent Fitting 1.2mm Single
Straight Batten Lamp Fitting
Pendant Lamp
Energy Lamp with "Warranty"
5 Amp Socket outlet
13 Amp Socket outlet
15 Amp Socket outlet
Calling bell with Necessary wiring
Sub Main wire 9/104 Single
Sub Main wire 9/104 Twine
Hood Lamp
Angle batten Lamp
8 Way MCB with ABC- Box
6 Way MCB with ABC- Box

Pair
kg.
kg.
No
No
No
No

531
532
533
534
535
536
537

Board
Earth pipe 2" Dia 5' - 0" Long G.I pipe
Electrician Mate
Main switch 32 amp single Phase
Main switch 63 amp. English
Main switch 32 amp.single Phase (MEM)
Plug with Switch 15 Amp Clipsal

No
L.m
Day
Per.No
Per.No
Per.No
Per.No

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 235 of 263

538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577

Plug with Switch 5 Amp Clipsal


Screws 2" x 10 Brass
Screws 1" x 6 Brass
7/.044 Single Core Wire
7/.044 Twin Core Wire
7/.064 Single Core Wire
3/.036 Wire
1/.044 Wire
Earth Wire 7/0.029
Flexible Wire
Brass Screws 1 1/2" x 6
Brass Screws 1 1/4" x 6
Brass Screws 1 1/2" x 10
Sunk Box
Round Plug
Ceiling Rose
Holder
Clipsal Switch 1 hung
Calling Bell
Bell Bush Clipsal
Ceiling Fan " USHA "
Ceiling Fan " KDK "
Ceiling Fan " Bajaj "
ABC Box 500 Type with circuit breakers (braker only)
ABC Box 700 Type with circuit breakers
ABC Box 900 Type with circuit breakers
Trip Switch crabtree 30Amp
Blub
Water tight lamp set
Flouresent lamp 4' - 0" set
Flouresent lamp 2' - 0" set
Hood lamp set
Wall bracket lamp set
Conduit pipe 1" Dia
Fan hook
Isolator 32 Amp (2 Pole)
Angle Iron
Bolt & Nut
Main switch 30 amp.single Phase (orin)
Trip Switch crabtree 30Amp(Orin)

Per.No
Per.No
Per.No
Per.Mtr
Per.Mtr
Per.Mtr
Per.Mtr
Per.Mtr
Per.Mtr
Per.Mtr
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per No
Per No
Per No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.No
Per.Mtr
Per.No
Per.No
L.ft
Kg
Per.No
Per.No

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 236 of 263

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 237 of 263

650.00
81.25
1000.00
125.00
1000.00
125.00
2210.00
3625.00
4085.00
4155.00
5000.00
4790.00
7.20
6000.00
395.00
445.00
2000.00
800.00
800.00
749.00
749.00
749.00
450.00
175.00
140.00
35.00
45.00
518.00
500.00
295.00
100.00
111.00
73.00
870.00
Class III
24,850.00
425.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 238 of 263

222.00
45.00
50.00
45.00
50.00
55.00
60.00
57.75
66.15
25.20
645.00
675.00
700.00
1175.90
4200.00
4515.00
5500.00
1302.00
1330.00
20.00
30.00
217.00
990.00
660.00
1700.00
45.00
88.20
1750.00
2300.00
1130.00
42.00
31.50
165.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 239 of 263

546.00
1239.00
45.00
80.00
100.00
135.00
225.00
178.50
2500.00
2500.00
242.55
2.00

116.00
133.00
150.00
132.30
137.81
248.00
260.00
286.00
84.00
176.00
200.00
64.00
100.00
450.00
100.00
168.00
212.00
300.00
449.00
594.00
151.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 240 of 263

231.00
441.00
538.00
759.00
969.00
110.00
175.00
840.00
90.00
179.00
200.00
50.00
25.00
40.00
26.25
214.00
241.00
3400.00
3000.00
575.00
2300.00
960.00
315.00
50.00
92.40
185.00
105.00
220.00
75.00

1750.00
2800.00
4850.00
4500.00
3780.00
3570.00
5500.00
6000.00
3150.00
2500.00
1260.00
960.00
900.00
1000.00
1000.00
250.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 241 of 263

600.00
650.00
750.00
500.00
250.00
450.00
550.00
550.00
5500.00
9500.00
2700.00
3500.00
2415.00
420.00
1350.00
150.00
250.00
60.90
91.35
220.00
127.00
2500.00
3500.00
2350.00
750.00
625.00
1200.00
625.00
550.00
150.00
3700.00
175.00
3350.00
8000.00
3350.00
700.00

750.00
920.00
630.00
750.00
966.00
1750.00
199.50
341.25
446.25
603.75

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 242 of 263

950.00
1155.00
250.00
1350.00
800.00
2600.00
2400.00
4500.00
3200.00
5800.00
18000.00
27500.00
1758.75

173.25
105.00
12.60
290.00
975.00
2950.00
2600.00
1950.00
3100.00
1350.00
9500.00
16500.00
134.00
729.00
450.00
400.00
350.00
735.00
168.00
483.00
146.00
16.00
477.00
510.00
577.00
400.00
313.00
450.00
316.00
94.50
283.50
141.75
30.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 243 of 263

968.00
1184.00
855.75
1028.00
693.00

T250

300.58

300.58
489.30
End Cap
19.00
23.00
31.00
43.00
63.00
90.00
255.00
359.00
422.00

ball valve
105.00
175.08
188.09
294.68
392.33
625.89

Reducing
faucet tee

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 244 of 263

18.90
25.20
36.75
73.50
116.55
189.00
588.00
976.50
1249.50

1942.50
7.00
165.00
210.00
84.00
375.00
400.00
1650.00
1275.00
52.00
615.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 245 of 263

99.00
333.00
85.00
85.00
787.50
845.00
229.00
845.00
146.00
102.00
24.00
65.00
550.00
450.00
21.00
26.00

150.00
195.00
29.00
44.00
118.00

278.25

350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
9.10
19.00
11.00
13.00
8.00
18.00
17.00
27.00
7.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 246 of 263

1.60
1.60
1.25
1.35
3.45
3.15
4.85
0.55
168.00
73.50
15.00
189.00

1000.00
1000.00
430.00
35.00
40.00
723.00
586.00
416.00
780.00
648.00
768.00
1085.00
797.00
738.00
884.00
189.00
30.00
30.00
30.00
231.00
847.00
700.00
190.00
125.00
157.50
315.00
550.00
15.00
5.00
231.00
3.15
100.00
185.00
47.25

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 247 of 263

47.25
17.85
157.50
84.00

25000.00
40000.00
200.00
225.00
230.00
5.00

850.00

550.00

95.00
550.00
450.00
250.00
95.00
1050.00
750.00
2,750.00
7,500.00
310.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 248 of 263

295.00
18.00
12.00
60.00
85.00
80.00
40.00
9.20
23.55
25.00
5.00
6.00
6.00
55.00
10.00
35.00
25.00
75.00
550.00
250.00
4,250.00
4,250.00
4,250.00
210.00
210.00
210.00
2,800.00
55.00
950.00
850.00
550.00
950.00
1,500.00
15.00
150.00
1,100.00
80.00
200.00
220.00
1,450.00

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 249 of 263

275544406.xls - Price List - DEPARTMENT OF BUILDINGS - 250 of 263

Transport of Materials

Construction Materilas
---------------------1 Cub. Cost. of Rubble
1 Mile Transport
17 Miles Transport
Loading
Un loading

6254.30
299.50
106.47
156.65
64.64

6254.30
299.50
1809.99
156.65
64.64
--------8585.08

Per Cu.m SAY Rs:


2

1 Cub. Cost. of 2" Metal


1 Mile Transport
59 Miles Transport
Loading
Un loading

10258.75 10258.75
299.50
299.50
106.47 6281.73
156.65
156.65
64.64
64.64
--------17061.27
Per Cu.m SAY Rs:

1 Cub. Cost. of 1 1/2" Metal


1 Mile Transport
59 Miles Transport
Loading
Un loading

1 Cub. Cost. of 1" Metal


1 Mile Transport
59 Miles Transport
Loading
Un loading

1 Cub. Cost. of 3/4" Metal


1 Mile Transport
59 Miles Transport
Loading
Un loading

1 Cub. Cost. of 1/2" Metal

6558.00

14150.00 14150.00
299.50
299.50
106.47 6281.73
156.65
156.65
64.64
64.64
--------20952.52
Per Cu.m SAY Rs:

6488.00

11758.65 11758.65
299.50
299.50
106.47 6281.73
156.65
156.65
64.64
64.64
--------18561.17
Per Cu.m SAY Rs:

6028.00

11560.55 11560.55
299.50
299.50
106.47 6281.73
156.65
156.65
64.64
64.64
--------18363.07
Per Cu.m SAY Rs:

3033.00

13555.70 13555.70

7403.00

1 Mile Transport
59 Miles Transport
Loading
Un loading

7 1000 Nos Cost. of Bricks


1 Mile Transport
17 Miles Transport
Loading
Un loading

299.50
106.47
156.65
64.64

Per Cu.m
7.20
230.17
87.58
263.31
140.37

299.50
6281.73
156.65
64.64
--------20358.22
SAY Rs:
7200.00
230.17
1488.86
263.31
140.37
--------9322.71
SAY Rs:

1 Bus. Cost. of Lime (Slaked)


1 Mile Transport
4 Miles Transport
Loading
Un loading

395.00
5.87
5.80
4.26
2.67

1 Bus. Cost. of Lime (Boiled)


1 Mile Transport
4 Miles Transport
Loading
Un loading

445.00
5.87
5.80
4.26
2.67

1 Cub. Cost. of River Sand


1 Mile Transport
17 Miles Transport
Loading
Un loading

5660.00
299.50
106.47
156.65
64.64

1 Cub. Cost. of Earth


1 Mile Transport
0 Miles Transport
Loading
Un loading

2264.00
299.50
106.47
156.65
64.64

481.00

5660.00
299.50
1809.99
156.65
64.64
--------7990.78

Per Cu.m SAY Rs:


11

431.00

445.00
5.87
23.20
4.26
2.67
--------481.00
SAY Rs:

10

9.32

395.00
5.87
23.20
4.26
2.67
--------431.00
SAY Rs:

7193.00

2823.00

2264.00
299.50
0.00
156.65
64.64
--------2784.79

Per Cu.m SAY Rs:

984.00

12

1 Cub. Cost. of Gravel


1 Mile Transport
0 Miles Transport
Loading
Un loading

800.00
299.50
106.47
156.65
64.64

800.00
299.50
0.00
156.65
64.64
--------1320.79

Per Cu.m SAY Rs:


13

1 cwt Cost. of Cement Mitsui


1 Mile Transport
4 Miles Transport
Loading
Un loading

749.00
5.92
2.94
5.24
5.24

749.00
5.92
11.76
5.24
5.24
--------777.16
SAY Rs:

14

1 cwt Cost. of Cement Atlas


1 Mile Transport
4 Miles Transport
Loading
Un loading

322.08
5.92
2.94
5.24
5.24

1 cwt Cost. of Cement sanstha


1 Mile Transport
4 Miles Transport
Loading
Un loading

******
5.92
2.94
5.24
5.24

#VALUE!

35.00 35000.00
112.60
112.60
35.26
141.04
129.36
129.36
187.45
187.45
--------35570.45
Per No

17 1000 Nos Cost. of Ridge Tiles


1 Mile Transport
4 Miles Transport
Loading
Un loading

350.00

#VALUE!
5.92
11.76
5.24
5.24
--------#VALUE!
SAY Rs:

16 1000 Nos Cost. of Calicut Flat Tiles


1 Mile Transport
4 Miles Transport
Loading
Un loading

777.00

322.08
5.92
11.76
5.24
5.24
--------350.24
SAY Rs:

15

466.00

SAY Rs:

45.00 45000.00
112.60
112.60
35.26
141.04
129.36
129.36
187.45
187.45

35.50

--------45570.45
Per No
18

1 Nos Cost. of Corrigated Asbestos Sheet 718.00


1 Mile Transport
5.92
4 Miles Transport
2.94
Loading
5.24
Un loading
5.24

19

1 Nos Cost. of Flat Asbestos Sheet (4' x


1 Mile Transport
4 Miles Transport
Loading
Un loading

SAY Rs:

718.00
5.92
11.76
5.24
5.24
--------746.16
Per Sq.m
310.90
SAY Rs:
219.00
5.92
11.76
5.24
5.24
--------247.16
Per Sq.m
171.64

1 cwt Cost. of Tor Steel


1 Mile Transport
199 Miles Transport
Loading
Un loading

205*112

4980.00
5.92
2.94
5.24
5.24

Kg
21

1 cwt Cost. of Mild Steel (3/8", 1205*112


1 Mile Transport
199 Miles Transport
Loading
Un loading

4425.00
5.92
2.94
5.24
5.24

Kg
22

1 cwt Cost. of Mild Steel (1/4") 205*112


1 Mile Transport
199 Miles Transport
Loading
Un loading

310.00

219.00
5.92
2.94
5.24
5.24

SAY Rs:
20

45.50

3782.61
5.92
2.94
5.24
5.24

Kg

171.00

4980.00
5.92
585.06
5.24
5.24
--------5581.46
SAY Rs:

109.90

4425.00
5.92
585.06
5.24
5.24
--------5026.46
SAY Rs:

99.00

3782.61
5.92
585.06
5.24
5.24
--------4384.07
SAY Rs

86.30

23

1 Cu.ft Cost. of Timber(Sp.up.) 28*144/4


1 Mile Transport
199 Miles Transport
Loading
Un loading

526.83
2.57
1.23
1.39
1.39

50 x 50 Timber per L.m.

526.83
2.57
244.77
1.39
1.39
--------776.95
70.79
SAY Rs:

24

1 Cu.ft Cost. of Timber(Sp.cl.) 28*144/4


1 Mile Transport
199 Miles Transport
Loading
Un loading

526.83
2.57
1.23
1.39
1.39

50 x 50 Timber per L.m.


25

1 Cu.ft Cost. of Timber(Class I) 28*144/4


1 Mile Transport
199 Miles Transport
Loading
Un loading

526.83
2.57
1.23
1.39
1.39

50 x 50 Timber per L.m.

526.83
2.57
244.77
1.39
1.39
776.95
70.79
SAY Rs:
526.83
2.57
244.77
1.39
1.39
--------776.95
70.79
SAY Rs:

26

1 Cu.ft Cost. of Timber(Cl. II)


1 Mile Transport
199 Miles Transport
Loading
Un loading

28*144/4

439.02
2.57
1.23
1.39
1.39

50 x 50 Timber per L.m.

1 Cu.ft Cost. of Timber(Cl. III) 28*144/4


1 Mile Transport
199 Miles Transport
Loading
Un loading

274.39
2.57
1.23
1.39
1.39

50 x 50 Timber per L.m.

1 Cu.ft Cost. of Timber(Sp.Up.) /3.28*18


1 Mile Transport
199 Miles Transport
Loading
Un loading

806.71
2.57
1.23
1.39
1.39

70.79

62.79

274.39
2.57
244.77
1.39
1.39
524.51
47.79
SAY Rs:

28

70.79

439.02
2.57
244.77
1.39
1.39
689.14
62.79
SAY Rs:

27

70.79

806.71
2.57
244.77
1.39
1.39
1056.83

47.79

100x50 Timber Per Cu.m 37292.85


SAY Rs:
29

1 Cu.ft Cost. of Timber(Sp.Cl.) 28*144/8


1 Mile Transport
199 Miles Transport
Loading
Un loading

757.32
2.57
1.23
1.39
1.39

757.32
2.57
244.77
1.39
1.39
1007.44
100x50 Timber Per Cu.m 35549.99
SAY Rs:

30

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

31

1 Cu.ft Cost. of Timber(Cl. II)


1 Mile Transport
199 Miles Transport
Loading
Un loading

/3.28*18

680.49
2.57
244.77
1.39
1.39
930.61
100x50 Timber Per Cu.m 32838.87
SAY Rs: 32838.00
439.02
2.57
244.77
1.39
1.39
--------689.14
100x50 Timber Per Cu.m 24318.22
/3.28*18

439.02
2.57
1.23
1.39
1.39

1 Cu.ft Cost. of Timber(Cl. III)


1 Mile Transport
199 Miles Transport
Loading
Un loading

/3.28*18

296.34
2.57
244.77
1.39
1.39
546.46
100x50 Timber Per Cu.m 19283.29

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(6*2)


1 Mile Transport
199 Miles Transport
Loading
Un loading

19283.00

907.32
2.57
1.23
1.39
1.39

907.32
2.57
244.77
1.39
1.39
1157.44
150x50 Timber Per Cu.m 40843.12
SAY Rs:

34

24318.00

296.34
2.57
1.23
1.39
1.39

SAY Rs:
33

35549.00

680.49
2.57
1.23
1.39
1.39

SAY Rs:
32

37292.00

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport

44/(6*2)

775.61
2.57

775.61
2.57

40843.00

199 Miles Transport


Loading
Un loading

1.23
1.39
1.39

244.77
1.39
1.39
1025.73
150x50 Timber Per Cu.m 36195.49
SAY Rs:

35

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(6*2)

578.05
2.57
1.23
1.39
1.39

578.05
2.57
244.77
1.39
1.39
828.17
150x50 Timber Per Cu.m 29224.05
SAY Rs:

36

37

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(7*2)


1 Mile Transport
199 Miles Transport
Loading
Un loading

928.22
2.57
244.77
1.39
1.39
1178.34
175x50 Timber Per Cu.m 41580.84

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(7*2)

787.11
2.57
1.23
1.39
1.39

SAY Rs: 41580.00


787.11
2.57
244.77
1.39
1.39
--------1037.23
36601.24
SAY Rs:

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(7*2)

36601.00

580.66
2.57
1.23
1.39
1.39

580.66
2.57
244.77
1.39
1.39
830.78
175x50 Timber Per Cu.m 29316.26
SAY Rs:

39

29224.00

928.22
2.57
1.23
1.39
1.39

175x50 Timber Per Cu.m

38

36195.00

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(4*3)


1 Mile Transport
199 Miles Transport
Loading
Un loading

826.83
2.57
1.23
1.39
1.39

826.83
2.57
244.77
1.39
1.39
1076.95
100x75 Timber Per Cu.m 38002.90

29316.00

SAY Rs:
40

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(4*3)

771.95
2.57
1.23
1.39
1.39

771.95
2.57
244.77
1.39
1.39
1022.07
100x75 Timber Per Cu.m 36066.39
SAY Rs:

41

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(4*3)

570.73
2.57
244.77
1.39
1.39
820.85
100x75 Timber Per Cu.m 28965.85

42

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(5*3)


1 Mile Transport
199 Miles Transport
Loading
Un loading

43

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

28965.00

875.12
2.57
1.23
1.39
1.39

875.12
2.57
244.77
1.39
1.39
1125.24
125x75 Timber Per Cu.m 39707.03
SAY Rs: 39707.00
778.54
2.57
244.77
1.39
1.39
1028.66
125x75 Timber Per Cu.m 36298.77
44/(5*3)

778.54
2.57
1.23
1.39
1.39

SAY Rs:
1 Cu.ft Cost. of Timber(Cl. I)
1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(5*3)

36298.00

579.51
2.57
1.23
1.39
1.39

579.51
2.57
244.77
1.39
1.39
829.63
125x75 Timber Per Cu.m 29275.69
SAY Rs:

45

36066.00

570.73
2.57
1.23
1.39
1.39

SAY Rs:

44

38002.00

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(6*3)


1 Mile Transport
199 Miles Transport
Loading
Un loading

924.39
2.57
1.23
1.39
1.39

924.39
2.57
244.77
1.39
1.39

29275.00

1174.51
150x75 Timber Per Cu.m 41445.59
SAY Rs:
46

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(6*3)

790.24
2.57
1.23
1.39
1.39

790.24
2.57
244.77
1.39
1.39
1040.36
150x75 Timber Per Cu.m 36711.90
SAY Rs:

47

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(6*3)

585.37
2.57
244.77
1.39
1.39
835.49
150x75 Timber Per Cu.m 29482.25

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(6*4)


1 Mile Transport
199 Miles Transport
Loading
Un loading

940.24
2.57
244.77
1.39
1.39
1190.36
150x100 Timber Per Cu.m 42005.03

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(6*4)

42005.00

801.22
2.57
1.23
1.39
1.39

801.22
2.57
244.77
1.39
1.39
--------1051.34
150x100 Timber Per Cu.m 37099.20
SAY Rs:

50

29482.00

940.24
2.57
1.23
1.39
1.39

SAY Rs:
49

36711.00

585.37
2.57
1.23
1.39
1.39

SAY Rs:
48

41445.00

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(6*4)

37099.00

596.34
2.57
1.23
1.39
1.39

596.34
2.57
244.77
1.39
1.39
846.46
150x100 Timber Per Cu.m 29869.55
SAY Rs:

29869.00

51

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(8*4)


1 Mile Transport
199 Miles Transport
Loading
Un loading

983.69
2.57
1.23
1.39
1.39

983.69
2.57
244.77
1.39
1.39
1233.81
200x100 Timber Per Cu.m 43538.10
SAY Rs:

51

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(8*4)

823.17
2.57
1.23
1.39
1.39

823.17
2.57
244.77
1.39
1.39
1073.29
200x100 Timber Per Cu.m 37873.80
SAY Rs:

53

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(8*4)

609.15
2.57
1.23
1.39
1.39

54

1 Cu.ft Cost. of Timber(Sp.Up.) 44/(2*1)


1 Mile Transport
199 Miles Transport
Loading
Un loading

329.27
2.57
1.23
1.39
1.39

SAY Rs: 30321.00


329.27
2.57
244.77
1.39
1.39
579.39
26.39
SAY Rs:

1 Cu.ft Cost. of Timber(Sp.Cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(2*1)

329.27
2.57
1.23
1.39
1.39

50x25 Timber Per L.m

1 Cu.ft Cost. of Timber(Cl. I)


1 Mile Transport
199 Miles Transport
Loading
Un loading

44/(2*1)

329.27
2.57
1.23
1.39
1.39

26.00

329.27
2.57
244.77
1.39
1.39
--------579.39
26.39
SAY Rs:

56

37873.00

609.15
2.57
244.77
1.39
1.39
859.27
200x100 Timber Per Cu.m 30321.41

50x25 Timber Per L.m

55

43538.00

329.27
2.57
244.77
1.39
1.39
579.39

26.00

50x25 Timber Per L.m

26.39
SAY Rs:

57

12 Sq.ft 25mm plank(Sp.Up.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

117.99
2.57
1.23
1.39
1.39
25mm Plank Per Sq.m

1415.85
2.57
244.77
1.39
1.39
#REF!
SAY Rs:

58

12 Sq.ft 25mm plank(Sp.cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

68.60
2.57
1.23
1.39
1.39

25mm Plank Per Sq.m

12 Sq.ft 25mm plank(cl. I.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

52.13
2.57
1.23
1.39
1.39

25mm Plank Per Sq.m

12 Sq.ft 28mm plank(Sp.Up.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

132.93
2.57
1.23
1.39
1.39

28mm Plank Per Sq.m

61

12 Sq.ft 28mm plank(Sp.cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

12 Sq.ft 28mm plank(cl. I.)


1 Mile Transport
199 Miles Transport
Loading

.2)/3.28

1654.00

77.44
2.57
1.23
1.39
1.39

SAY Rs:
62

785.00

1595.12
2.57
244.77
1.39
1.39
1845.24
1654.32

SAY Rs:
929.27
2.57
244.77
1.39
1.39
1179.39
28mm Plank Per Sq.m 1057.36
.2)/3.28

962.00

625.61
2.57
244.77
1.39
1.39
875.73
785.12
SAY Rs:

60

#REF!

823.17
2.57
244.77
1.39
1.39
1073.29
962.24
SAY Rs:

59

26.00

58.84
2.57
1.23
1.39

706.10
2.57
244.77
1.39

1057.00

Un loading

1.39
28mm Plank Per Sq.m

1.39
956.22
857.28
SAY Rs:

63

12 Sq.ft 31mm plank(Sp.Up.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

147.26
2.57
1.23
1.39
1.39

31mm Plank Per Sq.m

1767.07
2.57
244.77
1.39
1.39
2017.19
1808.48
SAY Rs:

64

12 Sq.ft 31mm plank(Sp.cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

85.67
2.57
1.23
1.39
1.39

31mm Plank Per Sq.m

12 Sq.ft 31mm plank(cl. I.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

65.24
2.57
1.23
1.39
1.39

31mm Plank Per Sq.m

12 Sq.ft 38mm plank(Sp.Up.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

180.18
2.57
1.23
1.39
1.39

38mm Plank Per Sq.m

12 Sq.ft 38mm plank(Sp.cl.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

105.49
2.57
1.23
1.39
1.39

38mm Plank Per Sq.m

926.00

2162.20
2.57
244.77
1.39
1.39
2412.32
2162.72
SAY Rs:

67

1145.00

782.93
2.57
244.77
1.39
1.39
1033.05
926.16
SAY Rs:

66

1808.00

1028.05
2.57
244.77
1.39
1.39
1278.17
1145.92
SAY Rs:

65

857.00

2162.00

1265.85
2.57
244.77
1.39
1.39
1515.97
1359.12
SAY Rs:

1359.00

68

12 Sq.ft 38mm plank(cl. I.)


1 Mile Transport
199 Miles Transport
Loading
Un loading

.2)/3.28

80.18
2.57
1.23
1.39
1.39

38mm Plank Per Sq.m

962.20
2.57
244.77
1.39
1.39
1212.32
1086.88
SAY Rs:

1086.00