Beneficiar:
Executant:
Proiectant:
Obiectivul:
Obiectul:
Stadiul fizic:
eDevize
Culidiuc Adi
Formular F3
Lista cu cantitati de lucrari pe categorii de lucrari
SECTIUNEA TEHNICA
Nr.
Capitol de lucrari
SECTIUNEA FINANCIARA
U.M.
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
mp
962.48
material:
manopera:
utilaj:
transport:
11.01
4.83
5.92
0.26
0.00
10,598.34
4,646.93
5,698.22
253.18
0.00
tona
48.12
material:
manopera:
utilaj:
transport:
14.62
0.00
0.00
0.00
14.62
703.70
0.00
0.00
0.00
703.70
mp
962.48
material:
manopera:
utilaj:
transport:
3.65
3.17
0.48
0.00
0.00
3,517.56
3,054.10
463.45
0.00
0.00
4 PE16B# - Hidroiz. la pod.cu folie pe baza de bitumelastomeri termopl. elcor-H fixata prin incalz. locala
MP
962.48
material:
manopera:
utilaj:
transport:
63.39
41.86
16.75
4.77
0.00
61,012.92
40,292.02
16,126.16
4,594.74
0.00
mp
962.48
material:
manopera:
utilaj:
transport:
10.91
7.50
3.00
0.41
0.00
10,504.51
7,219.80
2,886.85
397.86
0.00
tona
92.39
material:
manopera:
utilaj:
transport:
14.62
0.00
0.00
0.00
14.62
1,351.09
0.00
0.00
0.00
1,351.09
90.80
material:
manopera:
utilaj:
transport:
37.49
31.52
5.96
0.00
0.00
3,403.93
2,862.31
541.62
0.00
0.00
mc
4.09
265.77
1,085.93
7.1
Pagina 1 din 2
Antet stanga
eDevize
Nr.
Capitol de lucrari
U.M.
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
90.80
material:
manopera:
utilaj:
transport:
13.85
8.91
4.91
0.03
0.00
1,257.82
808.58
446.10
3.13
0.00
mc
27.14
material:
manopera:
utilaj:
transport:
298.62
268.11
30.51
0.00
0.00
8,104.64
7,276.49
828.15
0.00
0.00
mc
27.36
265.77
7,270.64
mp
90.80
material:
manopera:
utilaj:
transport:
15.14
12.29
2.85
0.00
0.00
1,374.79
1,116.27
258.52
0.00
0.00
4.36
253.44
1,104.61
90.80
material:
manopera:
utilaj:
transport:
60.85
57.73
3.12
0.00
0.00
5,525.01
5,241.93
283.08
0.00
0.00
100
mp
9.62
material:
manopera:
utilaj:
transport:
160.34
135.08
20.43
4.82
0.00
1,542.44
1,299.49
196.54
46.41
0.00
MP
708.24
material:
manopera:
utilaj:
transport:
2.81
0.03
0.57
2.21
0.00
1,990.45
21.17
402.20
1,567.08
0.00
9.1
10.1
110,887.20
TVA (24.00%)
TOTAL GENERAL (inclusiv TVA)
26,612.93
137,500.12
Director
Sef proiect
Ofertant