Prepared by:
Samsung
Session -2
SCFT -S4 Mini/ troubleshooting Guide
Important Notes
Lunch break
Session -1
SCFT Introduction
SCFT Tests
Day 1
Hands on exercises
Document History
Edition
Date of Issue
Author
Ver 1.0
Samsung
Training Team
Preyas Hathi
Ver 2.0
1st
Ver 3.0
18th
May l2014
Samsung
Training team
Ver 4.0
Samsung
Training team
Ver 5.0
March 2014
13 July 2015
Samsung
Training Team
Samsung
Training team
Remarks
Document History
Edition
Date of Issue
Author
Remarks
14Aug2014
Samsung
Training Team
15 Oct 2014
Samsung
Training Team
(HD)
Ver 7.0
28 Oct 2014
Samsung
Training team
(HD)
Ver 8.0
01 Nov 2014
Samsung
Training team
(HD)
Ver 5.0
Ver 6.0
Ver 9.0
13 Jan 2015
Ver 10.0
Samsung
Training team
Ashish Shukla
Samsung
WJ Lee
Good to know
Keep your mobile phone in the silent mode during the session
Need to sign attendance sheet at the start and end of each day
At the end of each training post test will be conducted
Agenda
Health & Safety Requirements
Introduction to SCFT
What is SCFT
Overview of SCFT Process
SCFT Workflow
Roles & Responsibilities
SCFT Requirements
Lead time
Tools
TSSR Review
eNB Parameter Review
Drive Route
Checklists
Agenda
Physical Site Check
Measurements of height, azimuth, tilt
Drive Test
SCFT Stationary test
SCFT Moving test
Checklist during drive
Post SCFT Drive
Introduction to SCFT
(((
(((
SCFT Process
Preparation for SCFT
SOLPAR
Scope
No
Pass
Yes
Drive Test
Adjust Antenna
Parameter and
etc.
DT Engineer
DT Engineer
Extend support to circle SCFT Team for their minor & critical issues.
Interact with Samsung on Progress Management: Daily, Weekly,
Monthly basis.
SCFT Team Management and site allocation to DT Engineers,
Riggers & Car drivers.
Validation of drive routes, discussion of issues, site performance
analysis
Support field team for troubleshooting and any other support
during SCFT activity
Prepare the RF Database and data backup of all drive related tests
( including any snaps) and provide to Samsung
Rigger will make corrections on site and inform Drive Test Engineer
Drive Test Engineer will create the drive routes & configure the
Smart S4 mini as per defined test scenarios
Drive Test Engineer will save the log file. In case of handoff fail, bad
RSRP, call drop etc., inform respective teams immediately
Summary
Strictly follow all the health & safety guidelines
SCFT verifies the availability and desired performance of a site
SCFT involves physical & parameter check of eNodeB, corrections if needed,
followed by a drive test around the site
SCFT team consists of an DT engineer, Rigger and Car driver with well-defined
roles and responsibilities for all
Quiz
You find that the antenna azimuth is incorrect. You will _________
Correct it, log and report the error and then proceed with drive test
Proceed with the drive test and report it later
Cancel the drive test
SCFT Requirements
Tools Required
S.No
Tool Name
Description
Specification
Vehicle with AC
Power inverter
DC to AC
Over 500W
UE with XCAL
Compass
Tilt Measure
Over 5 Ports
Spanner
Adjustable spanner
1 set
Handset
S4 Mini
2 nos
10
Tool kit
1 set
6
7
Maintain performance check records with history as per the attached sheet
Appendex-Smart DM
performance management.xls
TSSR/Cellref
Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Ensure that the site is verified as per TSSR/Cell ref file, any deviation need to
report Samsung immediately
Attached annexure-1 for the same to be filled up and handed over to SOLPAR
PM, who later sends it over to Samsung RF manager.
In case of any deviation in the same it needs to be corrected in cell ref file/field
before proceeding for the drive.
If its a RP1 site and On field data does not match with cell ref file then no need
to rectify physical parameter at field but need to correct only cell ref file.
Antenna
parameters
Simulation
(Coverage Statistics
RSRP)
Satellite &
Vector maps
Site drawing
map
Satellite map: Pre analysis for service area. Google earth snapshots of actual locations and
populated areas
Vector Map: Refer during drive test.
TSSR /Cell
refReview
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
SOLPAR PM
OPT Engr
SOLPAR DT
Engineer
MIMO Type
(2x2, 4x2)
from LSM-R
TX power
from LSMR
Configuration
Parameters
MIMO
Mode
(TM3/TM4)
from LSM-R
Access class
barred for
other UEs
SON, ANR
features
Service Affecting
Alarms
Site down
High drop Rate
Low Tx Power
GPS Alarm
Tx Power
Tx Power is transmitted power from eNB station, measured Watts or dBm. Typical
value is 10W or 40dBm
RF Parameters
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
Morphology Type
Dense Urban
-107
Medium Urban
-110
Suburban
-113
Rural
-116
Major Road
Minor
Road
One lane
Important road
that leads from
one town or
city to another
TSSR Review
eNB Parameter
Verification
from LSM-R
Drive Route
Checklist
No
Contact Circle
Samsung RF lead
team for the
resolution
Resolved
OK
Yes
Yes
Yes
No
OK
Yes
Start testing
Summary
Perform regular testing of drive-test UEs
Preparations for SCFT consist of TSSR review, eNB parameter verification from
LSM-R, availability of drive route and checklists. Before proceeding to the site
make sure you have these
TSSR gives details about eNB physical parameters such as antenna height,
azimuth, tilt, pictures of obstruction, site drawings and map views
LSM-R parameters include details such as VSWR, Tx power and PCI
Ensure FTP connectivity before proceeding to site
Cover all sectors during the drive
Drive Test
Drive test engineer will start the drive test activity with stationary test.
Move over to Alpha sector and perform following activities
Latch on alpha sector PCI and RSRP, it should have a stable dominant RSRP
level from serving cell, and neighbor cells should not be dominant.
Check GPS status and select destination value of co-ordinates from map
window.
Assign Stationary-1 call setting with Cycle information & site details, (CYCLE
should remain the same until the complete SCFT test (STATIONARY & MOVING)
ends), if you have to restart the test cause of any issue then issue new and
different cycle number, but it should be same for stationary and moving test
(ideally it should be incremented by 1, every time you repeat the test on same
site), cycle is a reference for naming the log files.
Moving Test
After completion of Stationary test now the DT has to go for the Moving test, drive test
engineer will use two S4 mini handsets.
There will be two different tests that shall be performed on these handsets.
Moving test call logging should start by performing a walk test around the site in clockwise and
anticlockwise direction for checking the inter-sector handover within the SCFT site and checking
the correct PCI as seen in cell reference file.
Drive test engineer will carry out the remaining part of moving test while in car in a continuous
log.
Keep checking the PCI of serving cell so as to confirm handover between neighbors of same site.
Move from Alpha sector to Beta sector to check handover between them.
Move from Beta sector to Gamma sector to check handover between them.
Move from Gamma sector to Alpha sector to check handover between them.
Move from Alpha sector to Gamma sector to check handover between them.
Move from Gamma sector to Beta sector to check handover between them.
Move from Beta sector to Alpha sector to check handover between them.
Make Coverage footprint of each sector in all possible drive routes based on Morphology based RSRP
Levels.
After finishing the clockwise / anti-clockwise routes, You must run through DTR (Drive test route) provided
to you by Samsung RF lead
NOTE : Samsung RF lead has to provide DTR based on best server plot , as per example attached below. Or
Alternately Samsung RF lead must follow procedures provided by National RF Optimization team to prepare
DTR , This is Mandatory
Moving Test
Important: If handovers are not happening between neighbor cells then stop the drive
and call up LSMR engineer for handover definition or any alarms related to the same,
and resume the drive, post the resolution of the same.
SCFT Tool
(XCAL mobile - software version v4.09.139 )
Operational Process
Please follow below step by step process, in order to conduct SCFT automation
process on XCAL Auto call
Only 1 mobile is used for Stationary test.
The screenshots are only applicable to handset software version v4.09.139
Start Samsung S-4 Mini testing handset.
After the upload is done for Stationary 1 test, it will prompt for Do you want
to perform Stationary 2. Now go for stationary 2(Beta sector) test.
Press Start under Autocall in both handsets. Check the traffic should get
started on both handset .
This will automatically upload the logs after every test scenario.
Instead of pressing Ok if you choose to cancel or mistakenly press cancel then
you need to upload logs manually as explain next slide
check the FTP server connectivity in your phones, check the IP address, user id
and password and server path as shown below.
Important Notes
Min
Average
Max
DL Throughput
2 Mbps
20 Mbps
40 Mbps
UL Throughput
256 Kbps
1Mbps
4 Mbps
RSRP
-108 dBm
--
--
SINR
20 dB
--
--
Legend
Throughputs for Moving in Worst condition shouldnt go below min. as per following table when
RSRP = -108dbm and SINR = 20db
Please note Throughput should be better when RSRP and SINR is better
* Above table is just for reference for worst condition only
Summary
eNB physical check involves checking azimuth (note free range), tilt, antenna
height, tower height
Quiz
Average DL throughput should be at least ____
4 Mbps
20 Mbps
40 Mbps
Notification:Samsu
ng AM, RJIL CTO
Notification:
Samsung CH,
SOLPAR PM
Notification:
Solpar PM,
Samsung RF Lead
Accept/Reject(i
f SOLFE is
needed to be
involved
Samsung
Optimization
engineer.
Reject
Notification : Samsung
Area Manager,
Sasmsung RF lead, RJIL
RF lead, SOLPAR FE
Reject
Responsibility:
GIS/SIITE FORGE;
Notification:
Samsung CH
Accept
RJIL CTO
Validates
SCFT report
Accept
Notification:
Samsung AM,
Samsung RF
Lead, Samsung
CH, RJIO CTO.
Notification:Sams
ung AM, Samsung
RF Lead, Samsung
CH, RJIO CTO, RJIL
RF lead
Notification:
Samsung -CH
Samsung
Optimization
team Validates
the SCFT
report(Accept/Rej
ect)
End
Responsibility: RJIL
Circle CTO / GIS /
System
Notification RJIL
Circle CTO, GIS
CH - Login
Circle Head can login by entering his user name & password here
CH Dashboard, Sites
CH has logged in & he
is able to view
dashboard which
overview of Site
details
CH Sites
Click here to
know details of
that particular
site
Siite
summary,RAN,Inv
entory,Trasnport,P
htos,Regulatory &
Documents can
be viewed here
Option to Sign
Out
CH has to click here to Assign
or Re-assign WO to AM
AM Login, Dashboard
AM can login by
entering username &
Password here
AM can view
dashboard here
AM has
logged in
here
AM Sites
List of sites are
displayed here
Filters can be
accessed here
Reports can be
downloaded
here by AM
AM Work Orders
List of Work Orders
are displayed here
Filters can
be
accessed
here
Click here
to assign
or reassign
Samsung
engineer
After
assigning
engineers
from drop
down
Click here
AM Work Orders.
Click here to see the list
of tasks available
Click here to
assign the task
to SOLPAR PM
SOLPAR PM logs in
by entering User
name & Password
Sites information
can be accessed
here
SOLPAR PM has
logged in
Filters for
accessing data
By clicking on
particular site
SOLPM will be able
to see details of
that site
select responsible
SOLPAR FE(DT
engineer)from
dropdown
SOLPAR FE(DT
Engineer)logs in with his
user name & Password
List of sites to be
handled can be
viewed here
SOLPAR FE (DT
engineer)has logged in
here
FE has to
click here to
complete
task
Perform
SCFT
Click here to
edit any
parameters
value if DT
has changed
during SCFT
After Editing
the
parameter
FE has to
save here
Parameter
Changes can
be viewed by
clicking here
By clicking
here FE will
be able to
see Reject
reason of
SCFT report
Samsung
Optimizer
logs in here
Samsung
Optimizer views
list of sites
When he
clicks on
particular
site he will
be able to
see Site
summary &
Etc.
Inventory
details are
displayed here
Transport
details are
displayed here
Site
documents are
displayed here
Site
documents can
be uploaded
here(if any)
Task status
is displayed
here
Click here to
know the
reason for
rejection
Paramet
er
changes
info can
be seen
here
Samsung
Optimizer
can sign out
here
Fail Reason
Stationary Test Fail
Handover Fail (No Attempt, HO
Fail)
Azimuth Mismatching
BSP Mismatching
Coverage Objective Fail.
Missing Route
Crossed Feeder or CPRI cable
Total
Handover (6)
KPI Fail %
20.9%
19.0%
13.5%
6.6%
16.7%
20.4%
2.9%
100%
16.7%
19.0%
13.5%
6.6%
SCFT Process
[ Automation System ]
[ SAMSUNG ]
Make Cellref
File & BSP
[ Circle RF Lead]
[ SOLPAR ]
Make SCFT
DTR
No
SiteForge
Report
Verify
Yes
ActixOne
SCFT Site
Survey
Report Submit
Yes
FMS
Ant.Para
Mismatch
PA2
No
Stationary Test
PA6,8
Handover Test
PA3
PA4,7
Cellref Eng.
RF Lead
SOLPAR
Rigger
SOLPAR
RF Lead
LSMR
Field Eng.
Check Inter
Sector
Neighbor List
Check Neighbor List
Handover Test
Anti-Clockwise
Clockwise
Beta
Map with the first tier neighbor
Gamma
Cellref Eng.
RF Lead
SOLPAR
Field Eng.
Drive Test
according to DTR
Cellref Eng.
RF Lead
SOLPAR
Field Eng.
Stationary Test
If sector swapped,
Change CPRI cable of
swapped secoters
Report CPRI cable changing status on Site Survey Check
List
Submit SCFT Site Survey Check List to NOPT engineer
2. Check that you get only one PCI assigned to test sector.
- eg. For figure shown, you must get PCI 9 for alpha sector.
If you get 10 PCI then that is sector swap.
Alpha
Beta
Beta
Alpha
Gamma
SOLPAR
RF Lead
Field Eng.
Drive Test
Cellref Eng.
SOLPAR
RF Lead
Field Eng.
Stationary Test
(UE Attach/VoLTE call
setup)
If VoLTE call fail, report to RF Lead with
symptom
Alpha
Summary
Work Order Assignment Management is also called as WAS.
AM receives SCFT trigger once ATP11B process is completed.
AM assigns SCFT Task to Samsung Optimizer & Samsung RF Head.
AM distributes(assigns) Perform SCFT Task to SOLPAR PM.
SOLPAR PM will further assign Perform SCFT task to SOLPAR FE(DT
Engineer).
SOLPAR FE has to accept this task from SOLPAR PM and follow below steps.
a)SOLPAR FE will conduct SCFT task using Mobile device(eg:S4 Mini) to
complete and upload test data to FMS server(separate process)
b)SOLPAR FE will input parameter changes(if any) to siteforge server and
submits it for Samsung Optimizer approval.
Samsung Optimizer will accept or reject according SCFT test data available in
FMS server and flow continues.
Overall WAS Improves productivity & complete visibility.
QUIZ
Question 1:
Who will assign SCFT Task to Samsung RF head ?
Ans:
Samsung Area Manager
Question 2:
Who will assign perform SCFT task to DT Engineer?
Answer:
PM(SOLPAR)
Question 3:
Whether Samsung RF head can reject approved SCFT data by Samsung Optimizer?
Answer:
A) Yes
B) No
Thank You