HIGHLIGHTS
REVISION NO. 17 Aug 01/11
Pages which have been revised are outlined below, together with the Highlights of the
Revision
-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------CHAPTER 27
__________

L.E.P. 1-32 REVISED TO REFLECT THIS REVISION INDICATING


NEW,REVISED, AND/OR DELETED PAGES
T. OF C.
REVISED TO REFLECT THIS REVISION
15, 2453
27-00-00
MOD.31152P7000
INCORPORATED
14
LANDING GEAR-STEERING-SUPPLY NOSE
WHEEL STEERING WITH YELLOW HYDRAULIC
POWER IN PLACE OF GREEN HYDRAULIC POWER

ALL

27-14-00
405

CORRECTION/ADDITION/AMPLIFICATION
ADDED A NEW INSTRUCTION IN THE NOTE:
AFTER DEACTIVATION OF THE AILERON, THE AMBER
F/CTL AILERON ACTUATOR FAULT MESSAGE IS
SHOWN ON THE EWD

ALL

27-14-00
505- 506,
511- 512

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-14-41
401, 405,
410, 413414

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-14-42
407, 410

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-14-51
406, 409410, 413420, 427,
429, 438,
440, 449,
451, 460,
462

CORRECTION/ADDITION/AMPLIFICATION
ADDED WARNING FOR LOCKWIRE
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL
ALL

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

1 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------27-21-61
401- 402,
407- 408,
411- 415,
421

TOOL DESIGNATION(S) DATA UPDATED


TITLE OF TASK(S) DATA UPDATED

ALL
ALL

27-22-00
501, 503,
505- 506

TOOL DESIGNATION(S) DATA UPDATED

ALL

27-23-17
410- 412

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL CHANGED FROM 11004 TO 11026

ALL

27-23-51
408, 410,
420, 422

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL CHANGED FROM 11004 TO 11026

ALL

27-24-51
412, 415,
428- 432,
437- 438

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL CHANGED FROM 11004 TO 11026

ALL

27-25-17
401, 403,
406, 408

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026
TOOL DESIGNATION(S) DATA UPDATED

ALL

27-26-00
401, 403

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-34-00
535- 536,
559- 560

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-34-00
601- 604,
606, 610613

CORRECTION/ADDITION/AMPLIFICATION
DELETED STEP (2) AND (3)
PIN-SIDE STICK LOCKING
AND WARNING NOTICE(S)
LAYOUT IMPROVED/MATERIAL RELOCATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-34-41
401- 402,
404- 405,
408- 418

CORRECTION/ADDITION/AMPLIFICATION
NOTE MODIFIED.

ALL

27-34-51
455- 458,
460- 466

CORRECTION/ADDITION/AMPLIFICATION
ADDED NOTE WITH REFERENCE TO SB A320-27A1186
OR TO GOODRICH SB 31075-27-21 AND

ALL

ALL

ALL
ALL

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

2 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------WARNING FOR SPECIAL MATERIAL.
27-41-43
406, 408409

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-44-51
626- 628,
648

MOD.35088K9959
REMOVED
FLIGHT CONTROLS-TRIMMABLE HORIZONTAL
STABILIZER (THS) - INSTALL THS ACTUATOR
P/N 47145-137

ALL

27-50-00
5

CORRECTION/ADDITION/AMPLIFICATION
ILLUSTRATION REVISED

ALL

27-51-00
544, 569,
571- 575,
A503-A518

CORRECTION/ADDITION/AMPLIFICATION
REF. TO FIGURE DELETED
LAYOUT IMPROVED/MATERIAL RELOCATED
TITLE OF TASK(S) DATA UPDATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-51-17
401- 404,
406- 407

EFFECTIVITY UPDATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

001-100,

27-51-18
407- 413

CORRECTION/ADDITION/AMPLIFICATION
ADDED ORANGE ZERO INDICATOR

ALL

27-51-34
404- 407

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

ALL
ALL
ALL

ALL

27-51-43
401- 404,
406- 407

EFFECTIVITY UPDATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

001-100,

27-51-51
405- 406,
423, 427428

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-54-00
608, 672,
688- 690

CORRECTION/ADDITION/AMPLIFICATION
UPDATE OF STEP 2 (D)
LAYOUT IMPROVED/MATERIAL RELOCATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-54-44

CORRECTION/ADDITION/AMPLIFICATION

ALL

ALL
ALL

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

3 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------406- 408,
416, 419421

CNSM 11004 AMENDED TO 11026.

27-54-46
416, 418,
420

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-54-49
401, 405406, 415416, 419423, 425434, 439440, 450,
457- 458,
470, 477478, 489

EFFECTIVITY UPDATED
CORRECTION/ADDITION/AMPLIFICATION
ADDED WARNING FOR MATERIALS
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-54-52
409, 412

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026

ALL

27-54-53
408, 410

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026

ALL

27-54-54
409, 412,
423- 428

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026

ALL

27-54-61
403, 408,
423, 428430, 433434

CORRECTION/ADDITION/AMPLIFICATION
ADDED ITEM (126) FOR CRUISE ROLLER

ALL

27-54-62
413, 416417

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-54-63
407- 411

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-64-00
406

CORRECTION/ADDITION/AMPLIFICATION
ADDED A NEW INSTRUCTION IN THE NOTE:
THE AMBER F/CTL SPOILER FAULT MESSAGE IS
SHOWN ON THE EWD

ALL

27-64-41

EFFECTIVITY UPDATED

ALL

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

4 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------401, 403,
405- 406,
408- 423

CORRECTION/ADDITION/AMPLIFICATION
ADDED NOTE FOR POSITION OF HINGE PIN AND
STEP FOR DIMENSION T
ADDED WARNING FOR MATERIALS
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-64-42
401- 404,
406- 411,
413- 419,
421, 423424, 427428

CORRECTION/ADDITION/AMPLIFICATION
REPLACED ACCESS PLATFORM 3.6 M WITH
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-64-43
401- 429

EFFECTIVITY UPDATED
CORRECTION/ADDITION/AMPLIFICATION
REPLACED ACCESS PLATFORM 3.7M (12 FT 2 IN)
WITH ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
LAYOUT IMPROVED/MATERIAL RELOCATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

27-64-44
401- 404,
406- 431

ALL

ALL

ALL
ALL
ALL

CORRECTION/ADDITION/AMPLIFICATION
REPLACED ACCESS PLATFORM 3.6 M WITH
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
LAYOUT IMPROVED/MATERIAL RELOCATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

CORRECTION/ADDITION/AMPLIFICATION
REPLACED ACCESS PLATFORM 3.9 M WITH
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
LAYOUT IMPROVED/MATERIAL RELOCATED
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

27-64-48
407- 410

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-80-00
232- 236

EFFECTIVITY UPDATED
CORRECTION/ADDITION/AMPLIFICATION
PROCEDURE REVISED. WORKSTEP 6 CHANGED,
WORKSTEPS 7 AND 8 DELETED.

ALL

27-81-42
405- 408

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-81-51
405- 406,
420, 423

EFFECTIVITY UPDATED
CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-64-45
401- 428

ALL
ALL

ALL
ALL

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

5 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------27-84-44
405, 407408, 414,
416, 422,
424, 430,
432, 438,
441, 446,
448

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-84-52
407- 408,
410

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026

ALL

27-84-53
407- 408,
411

CORRECTION/ADDITION/AMPLIFICATION
MATERIAL 11004 CHANGED BY 11026

ALL

27-84-54
407- 408,
410- 411,
420, 423

CORRECTION/ADDITION/AMPLIFICATION
ONS CODE DELETED STT CODE FOR CONTAINER
ADDED

ALL

27-84-61
421- 422,
426

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-84-62
423, 428

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-84-68
802, 804

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-84-69
410, 412

CORRECTION/ADDITION/AMPLIFICATION
CNSM 11004 AMENDED TO 11026.

ALL

27-90-00
25, 2730

EFFECTIVITY UPDATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

001-100,

27-92-13
401, 403

CORRECTION/ADDITION/AMPLIFICATION
TOOL QTY CORRECTED
TOOL DESIGNATION(S) DATA UPDATED

ALL

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

27-92-14
405- 408

ALL

ALL
27-HIGHLIGHTS Page
REVISION NO. 17

AIJ

6 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------27-92-16
404- 410

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

27-92-41
406, 409411, 416420, 430,
433, 472

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

27-93-00
301- 310

EFFECTIVITY UPDATED
CIRCUIT BREAKER(S) DATA UPDATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

27-93-34
404- 407

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

013-100,

MOD.20246P0357
INCORPORATED
ELECTRICAL POWER- DC ELECTRICAL LOAD
DISTRIBUTION- MODIFY P.A. SWITCHING
CORRECTION/ADDITION/AMPLIFICATION
IN PARAGRAPH 4.PROCEDURE
MOVE STEP (11) AT THE BEGINNING OF THE
PROCEDURE (BECOMES STEP (1))
WARNING/NOTE/REASON FOR THE JOB AMENDED

ALL

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

MOD.39059K12632 INCORPORATED
CABIN SYSTEM-ON BOARD MOBILE TELEPHONY
SYSTEM - INSTALL GSM WW EQUIPMENT (SFE)
FOR 55W01 VERSION
LAYOUT IMPROVED/MATERIAL RELOCATED

013-100,

27-94-00
403- 407

27-94-34
405- 409

27-95-34
404- 407

27-96-00
1,
3,
9

ALL

ALL
009-012, 015-100,
009-012, 015-100,

ALL
009-012, 015-100,

ALL

ALL

ALL

ALL

LAYOUT IMPROVED OR EFFECTIVITY UPDATED

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

7 of
8
Aug 01/11

-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------27-96-00
537- 538,
540- 568

EFFECTIVITY UPDATED
EFFECTIVITY UPDATED (THROUGHOUT THE TEXT)

001-100,

27-HIGHLIGHTS Page
REVISION NO. 17
AIJ

8 of
8
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
LIST OF EFFECTIVE PAGES
_______________________
N, R or D indicates pages which are New, Revised or Deleted respectively
Remove and insert the affected pages and complete the Record of Revisions and
the Record of Temporary Revisions as necessary
CH/SE/SU

PAGE

DATE

RECORD
OF TEMP.
REVISION
L.E.P.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.
T. of C.

R 1-32
1
2
3
4
5
6
7
8
9
10
11
12
13
14
R
15
16
17
18
19
20
21
22
23
R
24
R
25
R
26
R
27
R
28
R
29
R
30
R
31
R
32
R
33
R
34
R
35
R
36
R
37

Aug01/11
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Aug01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

CH/SE/SU
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.

of
of
of
of
of
of
of
of
of
of
of
of
of
of
of
of

C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.
C.

27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-00-00
27-10-00

PAGE
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

DATE

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
201
202
203
204
205
206
207

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

1 Feb01/07

CH/SE/SU

PAGE

27-10-00
27-10-00
27-10-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00

DATE

2 Feb01/07
3 Feb01/07
4 Feb01/07

R
R

R
R

1
2
3
4
401
402
403
404
405
406
407
408
409
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
601
602
603
604
605

Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/11
Feb01/07
Aug01/11
May01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Nov01/10
Aug01/07
Nov01/10
Aug01/07
Aug01/07
Aug01/07
Feb01/11
Aug01/08
Feb01/11
Feb01/07
Aug01/08

27-L.E.P. Page
1
Aug 01/11
AIJ

CH/SE/SU
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-00
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-41
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42

PAGE

R
R
R

606
607
608
609
610
611
612
613
614
615
616
617
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
601
602
603
604
605
606
607
608
609
610
401
402
403
404
405
406
407
408

DATE
Feb01/07
Aug01/08
Aug01/08
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Aug01/11
Nov01/10
Feb01/07
May01/10
Aug01/11
Feb01/07
Feb01/07
Aug01/09
Feb01/07
Aug01/11
Feb01/09
Nov01/10
Aug01/11
Aug01/11
May01/10
May01/10
May01/10
May01/10
Feb01/07
May01/10
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Aug01/11
Nov01/10

CH/SE/SU
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42
27-14-42
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51

PAGE
R

R
R
R
R
R
R
R
R
R
R
R

R
R

R
R

409
410
411
412
413
414
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445

DATE
Nov01/10
Aug01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Aug01/11
Aug01/07
Aug01/07
Aug01/11
Aug01/11
Nov01/10
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51
27-14-51

PAGE

DATE

446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
601
602
603
604
605
606

Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-20-00
27-20-00
27-20-00
27-20-00

1
2
3
4

Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00

1
2
3
4
5
6
7
8
9
201

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11

R
R

R
R

27-L.E.P. Page
2
Aug 01/11
AIJ

CH/SE/SU
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00

PAGE
202
203
204
205
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547

DATE
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Aug01/07
Feb01/07
Feb01/07
Aug01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Nov01/09
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Nov01/09
Feb01/07
Nov01/09
Aug01/07
Nov01/09
Feb01/11
Feb01/11
Nov01/09
Feb01/11
Aug01/07
Aug01/07
Feb01/11
Aug01/07
Aug01/07
Aug01/07
Aug01/07

CH/SE/SU
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-00
27-21-41
27-21-41

PAGE
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
401
402

DATE
Nov01/09
Feb01/11
Aug01/07
Aug01/07
May01/10
May01/10
May01/10
Aug01/07
Aug01/07
May01/10
Aug01/07
May01/10
Nov01/09
May01/10
Aug01/07
Aug01/08
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/11
Nov01/10
Feb01/08
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/08
Feb01/11
May01/11
Feb01/11
Feb01/07
Nov01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Aug01/09
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Nov01/10
Nov01/10
May01/11
May01/08
May01/08
May01/11
Nov01/10
Feb01/11
Aug01/07

CH/SE/SU
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-41
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42

PAGE
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
601
602
603
604
605
606
607
608
609
610
611
401
402
403
404
405
406
407
408

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Nov01/10
May01/08
Feb01/07
Feb01/07
May01/08
Feb01/07
Feb01/07
May01/08
May01/08
May01/10
May01/10
Feb01/11
May01/10
May01/10
May01/10
May01/10
Nov01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
Nov01/10
May01/10
Nov01/10
Nov01/10
May01/10
May01/10
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07

27-L.E.P. Page
3
Aug 01/11
AIJ

CH/SE/SU
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-42
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-43
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-44
27-21-45
27-21-45
27-21-45
27-21-45

PAGE
409
410
411
412
413
414
415
416
417
418
301
302
303
304
401
402
403
404
405
406
407
408
409
410
411
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
401
402
403
404

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Nov01/09
Nov01/09
Feb01/11
Feb01/11
Feb01/07
Feb01/11

CH/SE/SU
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-45
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-46
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47
27-21-47

PAGE
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421

DATE
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/08
Aug01/08
Feb01/11
Feb01/07
Feb01/07
Feb01/07
May01/10
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07

CH/SE/SU
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-48
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-49
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52

PAGE
401
402
403
404
405
406
407
408
409
410
411
412
413
414
401
402
403
404
405
406
407
408
409
410
411
412
413
601
602
603
604
605
606
607
608
609
610
611
612
401
402
403
404
405
406
407
408
409
410
411
412

DATE
Feb01/11
Feb01/11
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/11
Nov01/10
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
May01/11
Feb01/07
Nov01/10
Nov01/10
May01/11
Feb01/07
Feb01/07
May01/11
Nov01/10
May01/11
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
4
Aug 01/11
AIJ

CH/SE/SU
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-52
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-21-61
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00

PAGE

R
R

R
R
R
R
R
R
R

DATE

413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422

Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/07
May01/10
Feb01/07
Feb01/07
Aug01/11
Feb01/07

1
2
3
4
5
6
7
401
402
403
404
405
501

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/07
May01/11
Feb01/07
Aug01/11

CH/SE/SU
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-00
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51

PAGE
R
R
R

502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431

DATE
Feb01/11
Aug01/11
Feb01/07
Aug01/11
Aug01/11
Feb01/07
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Feb01/11
Feb01/11
May01/08
May01/08
May01/08
May01/08
Nov01/10
Nov01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
Nov01/10
May01/10
Nov01/10
Nov01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
Nov01/10
Feb01/11
Feb01/11
May01/10
Nov01/10

CH/SE/SU

PAGE

DATE

27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51
27-22-51

432
433
434
435
436
437
438
439

Nov01/10
May01/10
Nov01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10

27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-00
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17

1
2
3
4
5
6
7
8
9
10
11
12
401
402
403
404
405
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
401
402
403
404
405
406
407
408

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/07
May01/11
Feb01/07
Feb01/11
Feb01/11
Nov01/10
May01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/07
Nov01/10
Feb01/11
Nov01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/07
Feb01/11
Feb01/07
Feb01/11
Nov01/10
Feb01/07
Nov01/10
Feb01/07
Feb01/07

27-L.E.P. Page
5
Aug 01/11
AIJ

CH/SE/SU
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-17
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-41
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51
27-23-51

PAGE
R
R
R

R
R

R
R

409
410
411
412
413
414
415
416
417
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424

DATE
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Nov01/10
Nov01/08
Nov01/10
Nov01/10
Nov01/08
Feb01/11
Aug01/07
Aug01/07
Feb01/11
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/07
Nov01/10
Aug01/07
Nov01/10
Nov01/10
Nov01/10
Feb01/11
Feb01/07
Feb01/11
Feb01/07
May01/10
Feb01/07
May01/10
Aug01/11
May01/10
Aug01/11
Nov01/08
Nov01/08
May01/10
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
May01/10
Feb01/07

CH/SE/SU
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-00
27-24-51
27-24-51
27-24-51
27-24-51

PAGE
1
2
3
4
5
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
401
402
403
404

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Nov01/10
Feb01/07
Feb01/11
Feb01/11
Feb01/11
May01/11
Feb01/11
Feb01/11
May01/11
Feb01/07
Feb01/07
Nov01/10
May01/11
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Aug01/07
Feb01/07
Feb01/11
May01/11
Feb01/11
Feb01/07
Feb01/07
May01/11
Feb01/07
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/07

CH/SE/SU
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-24-51
27-25-00
27-25-00
27-25-00
27-25-00
27-25-00
27-25-00
27-25-00

PAGE

R
R

R
R
R
R
R

R
R

DATE

405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
601
602
603
604
605

Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Aug01/11
Feb01/11
Feb01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Aug01/11
Aug01/11
Nov01/10
Feb01/07
Nov01/10
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Aug01/08
Aug01/08

1
2
501
502
503
504
505

Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07

27-L.E.P. Page
6
Aug 01/11
AIJ

CH/SE/SU
27-25-00
27-25-00
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-25-17
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-00
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17
27-26-17

PAGE

R
R
R
R

R
R

DATE

506
507
401
402
403
404
405
406
407
408
409
410

Feb01/07
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Nov01/10
Feb01/07
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07

1
2
3
4
5
6
401
402
403
404
405
406
407
408
409
410
501
502
503
504
505
506
507
508
509
510
401
402
403
404
405
406
407
408
409
410
411
412

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/09
Aug01/11
Feb01/07
Feb01/11
May01/09
Feb01/11
Feb01/11
May01/09
May01/09
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07

CH/SE/SU
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-41
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51

PAGE
401
402
403
404
405
406
407
408
409
410
411
601
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439

DATE
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/08
Feb01/11
May01/11
May01/11
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/07
Feb01/11
May01/11
Feb01/07
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Feb01/07
Feb01/11
Feb01/11
May01/10
May01/10
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Feb01/11
Feb01/07
May01/11
May01/11
May01/11
May01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
May01/11
May01/11

CH/SE/SU

PAGE

DATE

27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51
27-26-51

440
441
442
443
601
602
603
604
605
606
607

May01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Aug01/07
Feb01/11
Aug01/07
Nov01/10
Aug01/07

27-30-00
27-30-00
27-30-00
27-30-00

1
2
3
4

Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00

1
2
3
4
5
6
7
401
402
403
404
405
406
407
408
409
410
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Nov01/10
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Nov01/09
Feb01/11

27-L.E.P. Page
7
Aug 01/11
AIJ

CH/SE/SU
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00

PAGE

R
R

R
R

518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568

DATE
Feb01/11
May01/10
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Feb01/11
May01/10
Feb01/11
May01/10
May01/10
May01/10
May01/10
May01/10
Aug01/11
Aug01/11
Feb01/11
May01/10
May01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/10
May01/10
Nov01/10
May01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
Feb01/11
Aug01/11
Aug01/11
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
May01/10
May01/10

CH/SE/SU
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00

PAGE

R
R
R
R
R

R
R
R
R

569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634

DATE
Nov01/10
May01/10
May01/10
Feb01/11
Nov01/10
May01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
Nov01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Aug01/11
Feb01/07
May01/11
May01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11

CH/SE/SU
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-00
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-41
27-34-42
27-34-42
27-34-42
27-34-42
27-34-42
27-34-42
27-34-42
27-34-42
27-34-51
27-34-51

PAGE

R
R
R
R
R
R
R
R
R
R
R
R
R
R
N

635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
601
602
603
604
605
606
607
301
302
303
304
305
306
307
308
401
402

DATE
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Aug01/11
Aug01/11
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/08
Nov01/07
Nov01/07
Nov01/07
Nov01/07
Aug01/08
Nov01/07
Nov01/10
Nov01/08
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10

27-L.E.P. Page
8
Aug 01/11
AIJ

CH/SE/SU
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51

PAGE
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453

DATE
Feb01/07
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Aug01/09
Feb01/07
Feb01/11
Nov01/09
Nov01/10
Nov01/10
Feb01/09
Nov01/10
Nov01/10
Aug01/08
Feb01/07
Feb01/11
Feb01/11
Aug01/07
May01/10
Aug01/07
Aug01/07
Feb01/11
Aug01/07
Feb01/11
Aug01/07
Feb01/11
Aug01/07
Aug01/07
Nov01/10
Nov01/09
May01/10
Aug01/07
Nov01/10
Nov01/09
Nov01/10
Aug01/07
Nov01/10
Nov01/09
Aug01/07
Aug01/07
Feb01/09
Feb01/09
May01/10
Aug01/07
Aug01/07
Feb01/09
Feb01/09
Aug01/07
Feb01/09

CH/SE/SU
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51
27-34-51

PAGE

DATE

454
455
456
457
458
459
460
461
462
463
464
465
466
601
602
603
604
605
606

Aug01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/09
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Nov01/07
May01/11
May01/11
May01/11
May01/11
May01/11

27-40-00
27-40-00
27-40-00
27-40-00
27-40-00
27-40-00
27-40-00
27-40-00

1
2
3
4
401
402
403
404

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07

27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00

1
2
3
4
5
6
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
May01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11

R
R
R
R
R
R
R
R
R
R
N

CH/SE/SU
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00

PAGE
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623

DATE
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/10
Feb01/07
Feb01/07
May01/10
Feb01/07
Feb01/07
May01/10
May01/10
May01/10
May01/10
May01/10
Feb01/07
Feb01/07
May01/10
Feb01/07
May01/10
May01/10
May01/10
Feb01/07
Aug01/08
May01/11
May01/11
May01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/10
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/11
May01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07

27-L.E.P. Page
9
Aug 01/11
AIJ

CH/SE/SU
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-00
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-41
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-42
27-41-43
27-41-43
27-41-43
27-41-43
27-41-43
27-41-43
27-41-43
27-41-43
27-41-43

PAGE

R
R
R

624
625
626
627
628
629
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
401
402
403
404
405
406
407
408
409

DATE
Feb01/07
Feb01/07
Feb01/07
May01/11
May01/11
May01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
May01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Nov01/10
Feb01/11
Feb01/07
Nov01/08
May01/09
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/11
Aug01/11
Aug01/11

CH/SE/SU

PAGE

DATE

27-41-43
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-44
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45
27-41-45

410
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416

Nov01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Aug01/09
Feb01/11
Feb01/07
Feb01/07
Feb01/07
May01/09
Feb01/07

27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00

1
2
3
4
5
6
7
8
9
10

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-00
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51

PAGE
11
12
13
14
15
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Aug01/07
May01/07
May01/07
May01/08
Feb01/08
May01/08
May01/11
Aug01/07
May01/09
Feb01/08

27-L.E.P. Page
10
Aug 01/11
AIJ

CH/SE/SU
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51

PAGE
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467

DATE
Feb01/08
Nov01/10
May01/11
May01/11
Feb01/11
May01/11
May01/09
May01/08
Nov01/10
Nov01/10
Nov01/09
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Nov01/10
May01/07
Aug01/07
May01/07
May01/07
May01/07
May01/07
May01/07
May01/11
May01/11
May01/07
May01/11
May01/11
May01/11
May01/07
May01/07
May01/07
Feb01/11
Feb01/11
Nov01/10
May01/07
May01/07
Feb01/11
Feb01/11
May01/09
May01/09
May01/07
Feb01/11
Feb01/11
Nov01/10
May01/07
May01/07
May01/07

CH/SE/SU
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51

PAGE

R
R
R

501
502
503
504
505
506
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645

DATE
Feb01/11
Feb01/11
Nov01/10
Feb01/07
Nov01/10
Nov01/08
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
May01/11
Aug01/08
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/09
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Aug01/11
Aug01/11
Aug01/11
May01/10
May01/10
Nov01/10
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Nov01/10
Feb01/07
May01/11
May01/11
May01/11
Feb01/07
May01/11
May01/11
May01/11
Feb01/11

CH/SE/SU
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-51
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-53
27-44-54
27-44-54
27-44-54
27-44-54
27-44-54
27-44-56
27-44-56
27-44-56
27-44-56
27-44-56
27-44-56
27-44-56
27-44-56
27-44-56
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57

PAGE

646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
401
402
403
404
405
406
407
408
409
410
411
412
501
502
503
504
505
401
402
403
404
405
406
407
408
409
401
402
403
404
405
406
407

DATE
Feb01/11
May01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/11
Feb01/11
Feb01/07
May01/10
May01/10
May01/10
May01/10
May01/10
Aug01/07
Feb01/11
Feb01/11
May01/10
Feb01/07
May01/10
Aug01/09
May01/10

27-L.E.P. Page
11
Aug 01/11
AIJ

CH/SE/SU

PAGE

27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57
27-44-57

408
409
410
411
412
413
414
415
416
417

27-45-00
27-45-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00

DATE
May01/10
Feb01/11
Feb01/11
Aug01/08
Feb01/07
May01/10
May01/10
May01/10
May01/10
May01/10

1 Feb01/07
2 May01/09

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/07
Feb01/07
Aug01/07
Feb01/07
Aug01/07
Feb01/07
Feb01/07
Aug01/07
Feb01/11
May01/11
May01/11
May01/11
May01/11
Feb01/07
Feb01/07
Aug01/07
Feb01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07

CH/SE/SU

PAGE

DATE

27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00
27-50-00

223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255

May01/11
May01/11
May01/11
Feb01/07
May01/11
Feb01/11
Feb01/07
Feb01/11
Nov01/10
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/08
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Nov01/08
Nov01/08
Feb01/11
Feb01/11
Nov01/08

27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00

PAGE
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
401
402
403

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
May01/07
May01/11

27-L.E.P. Page
12
Aug 01/11
AIJ

CH/SE/SU
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00

PAGE
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525

DATE
May01/11
May01/11
May01/11
May01/07
May01/11
May01/07
May01/09
May01/11
Nov01/10
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/08
May01/11
May01/11
May01/11
May01/11
May01/11
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
May01/10
Aug01/08
Aug01/08
Nov01/10
Feb01/11
Feb01/11
Nov01/09
Nov01/09
Feb01/07
Nov01/09
May01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/07
May01/11
May01/10
Feb01/11
Feb01/11

CH/SE/SU
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00

PAGE

R
R
R
R
R
R

526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576

DATE
May01/11
Feb01/07
May01/11
May01/09
May01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/08
Feb01/11
Aug01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Feb01/11
Feb01/07
Feb01/08
May01/10
Feb01/08
May01/11
Feb01/11
May01/10
May01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/11
May01/10
Feb01/07
Nov01/10
May01/10
May01/10
Feb01/11
Feb01/11
Nov01/10
May01/10
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11

CH/SE/SU
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-00
27-51-15
27-51-15
27-51-15
27-51-15
27-51-17
27-51-17
27-51-17
27-51-17
27-51-17

PAGE

R
R
R
R
R
R
R
R
R
R
R
R
N
N
N
N

R
R
R
R

577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
A500
A501
A502
A503
A504
A505
A506
A507
A508
A509
A510
A511
A512
A513
A514
A515
A516
A517
A518
401
402
403
404
401
402
403
404
405

DATE
May01/10
Feb01/11
May01/10
Feb01/11
Feb01/11
May01/10
May01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/10
May01/10
May01/10
Nov01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/10
May01/10
Feb01/11
May01/10
Feb01/11
May01/10
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/11

27-L.E.P. Page
13
Aug 01/11
AIJ

CH/SE/SU
27-51-17
27-51-17
27-51-17
27-51-17
27-51-17
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-18
27-51-19
27-51-19
27-51-19
27-51-19
27-51-19
27-51-19
27-51-19
27-51-19
27-51-19
27-51-34
27-51-34
27-51-34
27-51-34
27-51-34
27-51-34
27-51-34
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-43
27-51-44
27-51-44

PAGE
R
R

R
R
R
R
R
R
R

R
R
R
N
R
R
R
R
R
R

406
407
408
409
601
401
402
403
404
405
406
407
408
409
410
411
412
413
401
402
403
404
405
406
407
408
409
401
402
403
404
405
406
407
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
401
402

DATE
Aug01/11
Aug01/11
May01/11
May01/11
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Aug01/09
Feb01/11
Feb01/11
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/11
Aug01/11
Aug01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Nov01/10
Nov01/10

CH/SE/SU
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-44
27-51-51
27-51-51

PAGE
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
501
502
503
504
505
506
507
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
401
402

DATE
Feb01/07
May01/10
Nov01/10
May01/10
Nov01/10
May01/10
Aug01/07
Aug01/08
Aug01/07
Aug01/07
Aug01/07
Aug01/08
May01/10
May01/10
Nov01/10
May01/10
Aug01/07
Aug01/08
May01/10
May01/10
Feb01/07
Feb01/11
Nov01/10
May01/08
May01/08
Feb01/11
Feb01/11
Feb01/07
Feb01/11
May01/10
Nov01/10
Feb01/07
May01/10
Aug01/09
May01/10
May01/09
Feb01/07
Feb01/11
Feb01/07
Aug01/07
Feb01/11
Feb01/11
Aug01/07
May01/10
May01/10
May01/10
Feb01/11
Feb01/11
May01/10
Nov01/08
Feb01/07

CH/SE/SU
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00

PAGE

R
R

R
R

DATE

403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431

Feb01/07
Aug01/07
Aug01/11
Aug01/11
Feb01/07
Nov01/08
Feb01/07
Aug01/07
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Aug01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/09
Feb01/09

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
14
Aug 01/11
AIJ

CH/SE/SU
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00

PAGE
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/10
Feb01/08
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Feb01/07
Feb01/07
Feb01/08
Nov01/10
May01/10
Nov01/10
May01/09
May01/09
Nov01/10
Nov01/10
May01/09
May01/10
Nov01/10

CH/SE/SU
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00

PAGE

522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634

DATE
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/10
Nov01/08
May01/10
Nov01/08
Feb01/11
Nov01/09
Nov01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Aug01/11
May01/11
May01/11
Nov01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/09
May01/09
May01/11
May01/11
May01/10
May01/10
May01/11
May01/10
May01/10
May01/10
May01/10
May01/10
May01/11
May01/10
May01/10
May01/10
May01/10
May01/10

CH/SE/SU
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00

PAGE

635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685

DATE
May01/11
May01/10
May01/11
May01/10
Nov01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Nov01/09
Nov01/10
May01/09
May01/09
Nov01/10
Nov01/10
Feb01/11
May01/10
May01/09
Aug01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Aug01/08
Aug01/08
Aug01/08
Aug01/08
Aug01/08
Aug01/08
Aug01/08
Aug01/08

27-L.E.P. Page
15
Aug 01/11
AIJ

CH/SE/SU
27-54-00
27-54-00
27-54-00
27-54-00
27-54-00
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-41
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-44
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45

PAGE

R
R
N

R
R
R

R
R
R
R

686
687
688
689
690
401
402
403
404
405
406
407
408
409
410
411
412
413
414
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
401
402
403
404
405
406
407
408
409
410
411

DATE
Aug01/08
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Nov01/10
Feb01/11
Feb01/07
Nov01/10
Nov01/10
Nov01/08
Nov01/08
Nov01/10
Nov01/10
Nov01/08
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Aug01/11
Nov01/08
Nov01/08
Aug01/11
Aug01/11
Aug01/11
May01/09
Feb01/07
Feb01/07
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
May01/09
Nov01/09

CH/SE/SU
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45

PAGE
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462

DATE
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
Feb01/07
Feb01/07
Nov01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
May01/09
Feb01/07
Feb01/07
Feb01/07
Nov01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
Nov01/09
May01/09
Feb01/07
Feb01/07
Nov01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
Nov01/09
May01/09
Nov01/09

CH/SE/SU
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45

PAGE
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
A400
A401
A402
A403
A404
A405
A406
A407
A408
A409
A410
A411
A412
A413

DATE
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Feb01/07
May01/09
Nov01/09
May01/09
May01/09
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
May01/09
Feb01/07
Feb01/07
Feb01/07
Nov01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09

27-L.E.P. Page
16
Aug 01/11
AIJ

CH/SE/SU
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-45
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46

PAGE
A414
A415
A416
A417
A418
A419
A420
A421
A422
A423
A424
A425
A426
A427
A428
A429
A430
A431
A432
A433
A434
A435
A436
A437
A438
A439
A440
A441
A442
A443
A444
A445
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
R 416
417
R 418
419

DATE
Nov01/09
May01/09
Feb01/07
Feb01/07
Nov01/09
May01/09
May01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
May01/09
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
May01/09
May01/09
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Feb01/08
Feb01/07
Feb01/07
Feb01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/08
Feb01/08
Feb01/07
Feb01/08
Feb01/08
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/08
Aug01/11
Feb01/07

CH/SE/SU
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-47
27-54-48
27-54-48
27-54-48
27-54-48
27-54-48
27-54-48

PAGE
R

420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
401
402
403
404
405
406
407
408
409
410
411
401
402
403
404
405
406

DATE
Aug01/11
Nov01/08
Feb01/08
Nov01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Nov01/08
Feb01/07
Nov01/08
Feb01/07
Nov01/08
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Nov01/08
Feb01/07
Feb01/07
Nov01/08
Feb01/11
May01/10
Nov01/08
Nov01/08
Nov01/08
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08

CH/SE/SU
27-54-48
27-54-48
27-54-48
27-54-48
27-54-48
27-54-48
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49

PAGE

R
R

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

R
R

407
408
409
410
411
412
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445

DATE
Feb01/07
Nov01/08
Feb01/07
Nov01/08
Nov01/08
Feb01/07
Aug01/11
Nov01/09
Nov01/10
May01/08
Aug01/11
Aug01/11
May01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/07
Nov01/10
Nov01/10
Aug01/11
Aug01/11
May01/08
May01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/10
May01/10
Feb01/09
Feb01/09
Aug01/11
Aug01/11
May01/10
Feb01/09
Feb01/09
Nov01/10
Nov01/09

27-L.E.P. Page
17
Aug 01/11
AIJ

CH/SE/SU
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-49
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51

PAGE

R
R

R
R

446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
401
402
403
404
405

DATE
Nov01/09
Nov01/10
Nov01/10
Nov01/10
Aug01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Feb01/09
Feb01/09
Aug01/11
Aug01/11
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/09
Nov01/09
Nov01/10
Nov01/10
Nov01/10
Aug01/11
May01/10
May01/10
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Aug01/11
Aug01/11
Feb01/09
Feb01/09
Nov01/10
Nov01/09
Feb01/09
Feb01/09
Nov01/09
Nov01/10
Nov01/10
Nov01/10
Aug01/11
Nov01/10
Nov01/10
Feb01/11
Nov01/09
Feb01/11
Feb01/11
Feb01/07

CH/SE/SU
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-52
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53

PAGE

R
R

R
R

406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419

DATE
Nov01/08
Feb01/07
Feb01/07
May01/10
Feb01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Nov01/08
Feb01/11
Feb01/11
Nov01/10
Nov01/09
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Aug01/11
Feb01/08
Nov01/10
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/08
Nov01/10
May01/09
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Feb01/11
Aug01/11
Feb01/08
Aug01/11
May01/09
May01/09
Feb01/08
Feb01/07
Feb01/11
Feb01/08
Feb01/11
May01/09
May01/11

CH/SE/SU
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-54
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55

PAGE

R
R

R
R
R
R
R
R

420
421
422
423
424
425
426
427
428
429
430
431
432
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
401
402
403
404
405
406
407
408
409
410

DATE
May01/11
May01/11
May01/09
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/11
May01/11
May01/11
Feb01/08
Feb01/07
Nov01/10
Nov01/09
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Aug01/11
Feb01/08
Nov01/10
Aug01/11
Feb01/07
Feb01/07
Feb01/08
Feb01/07
Nov01/10
Nov01/09
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Nov01/09
Feb01/08
Feb01/08
May01/10
May01/10
Feb01/08
Feb01/11
May01/11
May01/11

27-L.E.P. Page
18
Aug 01/11
AIJ

CH/SE/SU
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-55
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61

PAGE

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
401
402
403
404
405
406
407
408
409
410
411
412

DATE
Nov01/09
Feb01/08
Feb01/07
Nov01/08
Nov01/08
Feb01/07
Nov01/08
Feb01/08
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/11
May01/11
Aug01/11
Feb01/07
May01/10
Nov01/08
Nov01/08
Aug01/11
May01/11
May01/10
May01/10
May01/11

CH/SE/SU
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-61
27-54-62

PAGE

R
R
R
R
R

413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
601
602
603
604
605
606
607
401

DATE
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
Aug01/11
Nov01/08
May01/11
May01/11
May01/11
Aug01/11
Aug01/11
Aug01/11
May01/11
May01/11
Aug01/11
Aug01/11
Nov01/10
Nov01/10
Nov01/08
Nov01/08
Nov01/08
Nov01/10
Feb01/09
Nov01/10
Feb01/09
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09

CH/SE/SU
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-62
27-54-63
27-54-63
27-54-63
27-54-63
27-54-63
27-54-63
27-54-63

PAGE

R
R
R

402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
601
602
603
604
605
606
401
402
403
404
405
406
407

DATE
Nov01/10
Nov01/10
Feb01/07
May01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/09
Feb01/07
May01/09
Aug01/11
Feb01/08
Nov01/10
Aug01/11
Aug01/11
Aug01/07
Feb01/07
Feb01/07
May01/09
May01/09
May01/10
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Feb01/07
Feb01/07
Aug01/07
Feb01/07
Feb01/07
Aug01/07
Feb01/07
Aug01/07
Aug01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11

27-L.E.P. Page
19
Aug 01/11
AIJ

CH/SE/SU
27-54-63
27-54-63
27-54-63
27-54-63

PAGE
R
R
R
R

DATE

408
409
410
411

Aug01/11
Aug01/11
Aug01/11
Aug01/11

27-55-00
27-55-00
27-55-00
27-55-00
27-55-00
27-55-00
27-55-00
27-55-11
27-55-11
27-55-11
27-55-11
27-55-11
27-55-11
27-55-11

1
2
3
4
5
6
7
401
402
403
404
405
406
407

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07

27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00
27-60-00

1
2
3
4
5
6
201
202
203
204
205
206

Aug01/08
Aug01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Nov01/09
Feb01/07
Nov01/09
Nov01/09

27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00

1
2
3
4
5
401
402
403
404
405
406
407
408
409
410
411
412
501

Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Aug01/11
Feb01/07
May01/11
Nov01/09
Nov01/09
Feb01/11
Feb01/07
Feb01/11

CH/SE/SU
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-00
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41

PAGE

R
R
R
R
R
R
R
R
R
R
R
R
R
R

502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
601
602
603
604
605
606
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417

DATE
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/07
Nov01/09
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/10
Nov01/09
Nov01/09
Nov01/10
Nov01/10
Nov01/10
Aug01/07
Aug01/07
Aug01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Aug01/11
Feb01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

CH/SE/SU
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-41
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42

PAGE
R
R
R
R
R
N

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

418
419
420
421
422
423
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423

DATE
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Feb01/11
Aug01/11

27-L.E.P. Page
20
Aug 01/11
AIJ

CH/SE/SU
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-42
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43

PAGE
R
R
R

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
N
N
N
N
N
N
N
N
N
N

424
425
426
427
428
429
430
431
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427

DATE
Aug01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

CH/SE/SU
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-43
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44

PAGE
N
N

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
N
N
N
N
N
N
N
N
N
N
N
N
N
N

428
429
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
601
602

DATE
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11

CH/SE/SU
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-44
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45

PAGE

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
N
N
N
N
N
N
N
N
N
N
N
N
N

603
604
605
606
607
608
609
610
611
612
613
614
615
616
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
601
602
603
604
605
606
607
608
609

DATE
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
21
Aug 01/11
AIJ

CH/SE/SU
27-64-45
27-64-45
27-64-45
27-64-45
27-64-45
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-48
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51

PAGE

R
R
R
R

610
611
612
613
614
401
402
403
404
405
406
407
408
409
410
411
412
413
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Nov01/08
Feb01/11
Feb01/11
Feb01/11
Nov01/10
Feb01/11
Feb01/11
Nov01/10
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Nov01/10
Feb01/11
Feb01/11
Nov01/10
Nov01/10
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10

CH/SE/SU

PAGE

DATE

27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51
27-64-51

434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449

Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Feb01/11
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10

27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00

1
2
3
4
5
6
7
8
9
10
11
12
13
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/09
Feb01/07
Feb01/07
May01/09
Feb01/11
May01/09
Feb01/11
May01/09
Feb01/07
May01/09
Feb01/07
Feb01/07
May01/09
Feb01/07
Feb01/11
Feb01/11
May01/09
May01/09
May01/09
May01/09
Feb01/11

CH/SE/SU
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-80-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00

PAGE

R
R
R
R
R

DATE

222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241

Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/09
May01/09
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/10

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
22
Aug 01/11
AIJ

CH/SE/SU
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-00
27-81-18
27-81-18
27-81-18
27-81-18
27-81-18
27-81-18
27-81-18
27-81-18

PAGE
31
32
33
34
35
401
402
403
404
405
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
401
402
403
404
405
406
407
408

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Nov01/10
Nov01/10
May01/11
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
May01/11
May01/10
May01/10
May01/10
May01/10
May01/10
May01/11
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/11
May01/11
May01/11
May01/10
May01/10
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/11
May01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-81-18
27-81-18
27-81-19
27-81-19
27-81-19
27-81-19
27-81-19
27-81-19
27-81-19
27-81-42
27-81-42
27-81-42
27-81-42
27-81-42
27-81-42
27-81-42
27-81-42
27-81-42
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-81-51
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00

PAGE

R
R
R
R

R
R

R
R

DATE

409
410
401
402
403
404
405
406
407
401
402
403
404
405
406
407
408
409
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426

Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/09
Feb01/07
May01/09
May01/09
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Aug01/08
Feb01/07
Feb01/07
Aug01/08
Aug01/11
Aug01/11
Aug01/09
Nov01/08
Feb01/07
Aug01/08
Feb01/07
Feb01/07
Aug01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/07
Aug01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07

1
2
3
4
5
6

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00

PAGE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
501
502
503
504
505
506
601
602
603
604
605
606
607
608
609
610
611
612
613
614

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Aug01/07
Feb01/11
Feb01/07
Feb01/07
May01/08
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/08
Feb01/11
May01/10
Feb01/07
Feb01/11

27-L.E.P. Page
23
Aug 01/11
AIJ

CH/SE/SU
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-00
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-41
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-42
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43

PAGE
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
401
402
403
404
405
406
407
408
409
410
411
412
401
402
403
404
405
406
407
408
409
410
411
412
413
414
401
402
403
404
405

DATE
Feb01/07
May01/10
May01/08
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
May01/10
May01/10
May01/08
Feb01/11
Feb01/11
Nov01/08
Feb01/07
Feb01/07
Feb01/11
Nov01/08
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Nov01/08
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Nov01/08
Feb01/11
Feb01/11
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Feb01/11
Feb01/11
Nov01/08
Feb01/07
Feb01/07

CH/SE/SU
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-43
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44

PAGE

R
R
R

R
R

R
R

R
R

R
R

406
407
408
409
410
411
412
413
414
415
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441

DATE
Nov01/08
Feb01/11
Feb01/11
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Nov01/08
Aug01/11
Feb01/07
Aug01/11
Aug01/11
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Aug01/11
May01/10
Aug01/11
May01/10
May01/10
Feb01/07
Feb01/07
Nov01/08
Aug01/11
May01/10
Aug01/11
Feb01/07
Feb01/07
Nov01/08
Nov01/08
Feb01/07
Aug01/11
Nov01/08
Aug01/11
Feb01/07
Feb01/07
May01/10
May01/10
May01/10
Aug01/11
May01/10
May01/10
Aug01/11

CH/SE/SU
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-44
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45

PAGE

R
R

442
443
444
445
446
447
448
449
450
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442

DATE
May01/10
Feb01/07
Feb01/07
Nov01/08
Aug01/11
Nov01/08
Aug01/11
Feb01/07
Feb01/07
Aug01/08
Feb01/07
Feb01/07
May01/09
Aug01/08
Nov01/09
Aug01/08
Nov01/09
Nov01/09
Nov01/09
Aug01/08
Aug01/08
Aug01/08
Nov01/09
Aug01/08
Nov01/09
Nov01/09
Nov01/09
Aug01/08
Aug01/08
Feb01/07
Nov01/09
Feb01/07
Nov01/09
Nov01/09
Nov01/09
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
Nov01/09
May01/10
Feb01/07
May01/10
May01/10
May01/10
Feb01/07
Nov01/09
May01/10
May01/10

27-L.E.P. Page
24
Aug 01/11
AIJ

CH/SE/SU
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45

PAGE
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493

DATE
Nov01/09
Nov01/09
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10

CH/SE/SU
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-45
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-48
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49

PAGE
494
495
496
497
498
499
A400
A401
A402
A403
A404
A405
A406
A407
A408
A409
A410
A411
A412
A413
A414
A415
A416
A417
A418
401
402
403
404
405
406
407
408
409
410
411
412
413
414
401
402
403
404
405
406
407
408
409
410
411
412

DATE
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
May01/10
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Nov01/09
Nov01/08
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Nov01/09
Feb01/07
Feb01/07
Nov01/08
Nov01/09

CH/SE/SU
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-49
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52
27-84-52

PAGE

R
R
R

413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
401
402
403
404
405
406
407
408
409
410
411
412
413
414

DATE
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Nov01/09
Nov01/09
Feb01/07
Nov01/08
Nov01/09
Nov01/09
Nov01/08
Nov01/08
Nov01/08
May01/11
Nov01/08
Feb01/11
May01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
May01/11
May01/11
Nov01/08
May01/11
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Feb01/11
Feb01/07
Feb01/11
Feb01/08
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Feb01/08
Feb01/07
Feb01/08
Feb01/08

27-L.E.P. Page
25
Aug 01/11
AIJ

CH/SE/SU
27-84-52
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54

PAGE

R
R
R

R
R
R
R

415
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417

DATE
Feb01/08
Feb01/11
Nov01/08
Feb01/11
Feb01/07
Nov01/10
Feb01/07
Aug01/11
Aug01/11
Feb01/11
May01/11
Aug01/11
Feb01/11
Feb01/07
Nov01/08
Feb01/07
Feb01/11
Feb01/08
Feb01/11
Feb01/07
May01/11
May01/11
May01/11
Feb01/08
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
May01/11
Nov01/08
May01/11
Feb01/08
Feb01/07
May01/11
Feb01/08
Feb01/11
Feb01/07
May01/11
May01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Feb01/08
Feb01/08
Feb01/08
Feb01/08
Nov01/10
Nov01/10

CH/SE/SU
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-54
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61

PAGE

R
R

R
R

418
419
420
421
422
423
424
425
426
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
601
602
603
604
605
606
607
608
609
610
611
612
613
614

DATE
Feb01/08
Feb01/07
Aug01/11
Feb01/07
Nov01/10
Aug01/11
Feb01/07
Feb01/08
Feb01/07
May01/10
May01/10
Feb01/07
Feb01/07
Nov01/09
May01/10
May01/10
May01/10
Feb01/07
Feb01/07
May01/10
May01/10
Feb01/07
Feb01/07
Nov01/08
Feb01/07
May01/10
May01/10
May01/10
Feb01/07
Aug01/11
Aug01/11
May01/10
May01/10
May01/10
Aug01/11
May01/10
May01/10
Nov01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62

PAGE

615
616
617
618
619
620
621
622
623
624
625
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
601
602
603
604
605
606
607
608
609

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Nov01/08
Nov01/08
Feb01/07
Feb01/07
Nov01/10
Nov01/10
May01/07
Feb01/07
Nov01/09
Nov01/08
Feb01/07
Feb01/07
May01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
26
Aug 01/11
AIJ

CH/SE/SU
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62

PAGE
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-62
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-63
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64

PAGE
661
662
663
664
665
666
667
668
669
670
671
672
673
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
401
402
403
404
405
406
407
408
409
410
411

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Nov01/09
Feb01/07
Feb01/07
May01/11
Feb01/11
Feb01/11
May01/11
Feb01/08
Aug01/09
Feb01/07
Aug01/09
Aug01/09
May01/10
Feb01/08
Feb01/11
May01/10
Feb01/11
May01/10
May01/10
May01/10
May01/10
Feb01/07
May01/10
Feb01/11
May01/10
Feb01/11
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Feb01/11
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Nov01/10
May01/10
Feb01/11

CH/SE/SU
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-64
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-65
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66
27-84-66

PAGE
412
413
414
415
416
417
418
419
420
421
422
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419

DATE
Nov01/10
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/08
May01/09
Nov01/10
May01/10
May01/09
Nov01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/09
Nov01/10
Nov01/10
Feb01/07
Feb01/08
May01/10
May01/10
Feb01/07
Feb01/08
Nov01/10
May01/10
Nov01/10
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10

27-L.E.P. Page
27
Aug 01/11
AIJ

CH/SE/SU
27-84-66
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-67
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-68
27-84-69
27-84-69

PAGE

R
R

420
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
801
802
803
804
805
806
807
808
401
402

DATE
May01/10
Feb01/08
Nov01/10
Aug01/09
Feb01/07
Feb01/08
Feb01/08
May01/10
May01/10
Feb01/08
Nov01/10
May01/10
Nov01/10
Nov01/10
Aug01/09
May01/10
May01/10
May01/10
May01/10
May01/10
Nov01/10
Nov01/10
Nov01/10
Nov01/10
May01/08
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/09
Nov01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Nov01/08
Feb01/07
Aug01/09
Aug01/11
Nov01/10
Aug01/11
Aug01/09
Aug01/09
Aug01/09
Aug01/09
Feb01/07
Feb01/08

CH/SE/SU
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69
27-84-69

PAGE

DATE

403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418

Feb01/07
Nov01/09
Feb01/07
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Aug01/11
Nov01/10
Aug01/11
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09
Nov01/09

27-85-00
27-85-00
27-85-00
27-85-00
27-85-00
27-85-00
27-85-00
27-85-00
27-85-11
27-85-11
27-85-11
27-85-11
27-85-11
27-85-11
27-85-11

1
2
3
4
5
6
7
8
401
402
403
404
405
406
407

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07

27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/10
Feb01/07
May01/10
Feb01/11
May01/10
Feb01/11
Feb01/11
May01/08
May01/08

R
R

CH/SE/SU
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-90-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00
27-92-00

PAGE

R
R
R
R
R

DATE

19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

May01/08
May01/08
May01/08
May01/08
May01/08
May01/08
Aug01/11
May01/08
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
28
Aug 01/11
AIJ

CH/SE/SU
27-92-00
27-92-00
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-13
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-14
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-15
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-16
27-92-17
27-92-17

PAGE

R
R

R
R
R
R

R
R
R
R
R
R
N

401
402
401
402
403
404
405
406
407
408
409
410
411
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
401
402
403
404
405
406
407
408
409
410
401
402
403
404
405
406
407
408
409
410
401
402

DATE
May01/10
May01/10
Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
May01/07
May01/07
Feb01/07
Feb01/07
Feb01/07
May01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/11
May01/11

CH/SE/SU
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-17
27-92-27
27-92-27
27-92-27
27-92-27
27-92-27
27-92-27
27-92-27
27-92-27
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41

PAGE

R
R
R
R

R
R
R
R
R

403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
401
402
403
404
405
406
407
408
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420

DATE
Feb01/07
Feb01/07
May01/11
Feb01/07
May01/11
May01/11
May01/11
May01/11
May01/11
Feb01/07
May01/11
Nov01/08
May01/11
Nov01/08
Nov01/08
May01/11
May01/11
Feb01/07
Feb01/07
May01/11
Feb01/07
May01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Aug01/07
Aug01/07
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/11
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Feb01/07
May01/11
May01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

CH/SE/SU
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41

PAGE

R
R

421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Nov01/10
Nov01/10
Nov01/10
Feb01/07
Aug01/11
Feb01/11
Nov01/10
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Nov01/10
Feb01/07
Feb01/11
Feb01/11
Nov01/10
Feb01/07
Feb01/07
Feb01/07
May01/09
Feb01/07
Feb01/07
Feb01/11
Feb01/11
May01/09
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Aug01/08
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Aug01/08
Feb01/07
Feb01/07
Feb01/07
Nov01/08
Feb01/07
Feb01/07
Nov01/08
Feb01/11

27-L.E.P. Page
29
Aug 01/11
AIJ

CH/SE/SU
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-92-41
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00

PAGE
R

DATE

472
473
474
475
476
477
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516

Aug01/11
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Nov01/08
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Aug01/08
Aug01/08
Feb01/07

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

CH/SE/SU
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00

PAGE

R
R
R
R
R
R
R
R
R
R

29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
301
302
303
304
305
306
307
308
309
310
401
402
403
404
405
406
407

DATE
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Nov01/10
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
May01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07

CH/SE/SU
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-00
27-93-34
27-93-34
27-93-34
27-93-34
27-93-34
27-93-34
27-93-34
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00

PAGE

R
R
R
N

DATE

408
409
410
411
412
413
414
415
416
417
418
419
420
501
502
503
504
505
506
507
508
509
510
511
512
401
402
403
404
405
406
407

Feb01/07
May01/11
May01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
May01/10
Aug01/08
Feb01/11
Feb01/11
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07

27-L.E.P. Page
30
Aug 01/11
AIJ

CH/SE/SU
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00

PAGE

19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
401
402
403

DATE
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
May01/11
May01/11
Feb01/11
Aug01/11

CH/SE/SU
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-00
27-94-34
27-94-34
27-94-34
27-94-34
27-94-34
27-94-34
27-94-34
27-94-34
27-94-34
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00

PAGE
R
R
R
R

R
R
R
R
N

DATE

404
405
406
407
408
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
401
402
403
404
405
406
407
408
409

Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/11
May01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
May01/10
May01/10
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

May01/11
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
May01/11

CH/SE/SU
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-00
27-95-34
27-95-34
27-95-34
27-95-34
27-95-34
27-95-34
27-95-34
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00

PAGE

R
R
R
R
R
R

DATE

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
401
402
403
404
405
406
407

Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/07
Aug01/11
Aug01/11
Aug01/11
Aug01/11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Aug01/11
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Aug01/11
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
Feb01/07
May01/11
Feb01/07

27-L.E.P. Page
31
Aug 01/11
AIJ

CH/SE/SU
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00

PAGE

R
R
R
R
R
R
R
R

18
19
20
21
22
23
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545

DATE
Feb01/07
Feb01/07
May01/11
Feb01/07
May01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/07
Feb01/07
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/07
Feb01/11
Feb01/09
Feb01/09
Feb01/09
Feb01/09
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Aug01/11
Aug01/11
Feb01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11

CH/SE/SU
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00

PAGE
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596

DATE
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Aug01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11

CH/SE/SU
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00
27-96-00

PAGE
597
598
599
A500
A501
A502
A503
A504
A505

DATE
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11
Feb01/11

27-L.E.P. Page
32
Aug 01/11
AIJ

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
FLIGHT CONTROLS - GENERAL
_________________________
DESCRIPTION AND OPERATION
Description of Primary Flight
Controls
Glossary
General Principles
Ailerons
Rudder
Elevators (Ref. 27-30 and 27-90)
Trimmable Horizontal Stabilizer
(Ref. 27-40 and 27-90)
Spoilers
Electrical Flight Control System
Flight Controls Power Supply
Electrical Power Supply
Hydraulic Power Supply
Cockpit Flight Control And
Indicating

________
CH/SE/SU
27-00-00

__________________________
FLIGHT CONTROLS - GENERAL
MAINTENANCE PRACTICES
Installation of the Pitch-Trim
Control Locking Tool
(98D27403500000)
Removal of the Pitch-Trim Control
Locking Tool (98D27403500000)
Installation of the Flap/Slat
Control-Lever Locking Tool
(98D27803000000)
Removal of the Flap/Slat
Control-Lever Locking Tool
(98D27803000000)

27-00-00

_______
AILERON
DESCRIPTION AND OPERATION
General
System Description
Interface with the Autopilot
System (Ref. 22-60)

27-10-00

AILERON AND HYDRAULIC ACTUATION


DESCRIPTION AND OPERATION
General
Component Location
Hydraulic Supply (Ref. ATA 29)

27-14-00

C
_

PAGE ___________
____
EFFECTIVITY
1
1

ALL
ALL

1
1
3
3
4
4

ALL
ALL
ALL
ALL
ALL
ALL

5
5
10
10
13
13

ALL
ALL
ALL
ALL
ALL
ALL

201
201

ALL
ALL

204

ALL

205

ALL

207

ALL

1
1
1
1

ALL
ALL
ALL
ALL

1
1
1
1

ALL
ALL
ALL
ALL

27-CONTENTS
R
AIJ

Page 1
Feb 01/07

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Component Description
Aileron Servocontrol
Operation
Normal operation with the
servocontrol pressurized
Operation after an electrical
failure
Operation after a hydraulic
failure
Special Case
Maintenance and rigging
facilities

CH/SE/SU
________

AILERON AND HYDRAULIC ACTUATION


DEACTIVATION/REACTIVATION
Deactivation of the Aileron Servo
Control
Refer to the MMEL TASK:
27-14-0X-A)
Reactivation of the Aileron Servo
Control
Refer to the MMEL TASK:
27-14-0X-A)

27-14-00

AILERON AND HYDRAULIC ACTUATION


ADJUSTMENT/TEST
Operational Test of the Aileron
and Hydraulic Actuation
Adjustment of the Aileron
Electrical Test of the Aileron
Servo Controls

27-14-00

AILERON AND HYDRAULIC ACTUATION


INSPECTION/CHECK
Check Aileron Servo Controls and
Hinge Bearings for Excessive Play
and Condition
Check of the Aileron Servo
Controls Fluid Reserve Piston
Position with the Hydraulic
Reservoirs Depressurized
Check of the Aileron Servo Control
Oscillations

27-14-00

C
_

____ ___________
PAGE
EFFECTIVITY
1 ALL
1 ALL
1 ALL
1 ALL
4

ALL

ALL

4
4

ALL
ALL

401
401

ALL
ALL

401

ALL

406

ALL

406

ALL

501
501

ALL
ALL

505
515

ALL
ALL

601
601

ALL
ALL

610

ALL

614

ALL

27-CONTENTS
R
AIJ

Page 2
Nov 01/10

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
AILERON
REMOVAL/INSTALLATION
Removal of the Aileron
Installation of the Aileron
AILERON
INSPECTION/CHECK
Inspection/Check of the Aileron
CHECK VALVE
REMOVAL/INSTALLATION
Removal of the Check Valve
1626GM(1627GM)
Installation of the Check Valve
1626GM(1627GM)
SERVO CONTROL - AILERON
REMOVAL/INSTALLATION
Removal of the Aileron Servo
Control
Installation of the Aileron Servo
Control
Removal of the Hydraulic Filter
for the Aileron Servo-Control
Installation of the Hydraulic
Filter for the Aileron
Servo-Control
Removal of the Aileron
Servo-Control Servovalve
Installation of the Aileron
Servo-Control Servovalve
Removal of the Aileron
Servo-Control Solenoid Valve
Installation of the Aileron
Servo-Control Solenoid Valve
Removal of the Linear
Variable-Differential Transformer
(LVDT) of the Aileron- Servo
Control
Installation of the Linear
Variable-Differential Transformer
(LVDT) of the Aileron
Servo-Control
Removal of the Actuator Eye-End of
the Aileron Servo-Control
Installation of the Actuator
Eye-End of the Aileron
Servo-Control
SERVO CONTROL - AILERON

________
CH/SE/SU
27-14-41

C
_

PAGE ___________
____
EFFECTIVITY
401
401
410

ALL
ALL
ALL

601
601

ALL
ALL

401
401

ALL
ALL

407

ALL

401
401

ALL
ALL

409

ALL

421

ALL

426

ALL

432

ALL

437

ALL

443

ALL

448

ALL

454

ALL

459

ALL

465

ALL

469

ALL

27-14-41
27-14-42

27-14-51

27-14-51
27-CONTENTS

R
AIJ

Page 3
Nov 01/10

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
INSPECTION/CHECK
Check of the Aileron Servo Control

CH/SE/SU
________

______
RUDDER
DESCRIPTION AND OPERATION
General
Interface with the Autoflight
System
Interface with the Braking
System
Interface with the Nosewheel
Steering System

27-20-00

RUDDER MECHANICAL CONTROL


DESCRIPTION AND OPERATION
General
Component Location.
Component Description
Cable Tension Regulator
Servocontrol Actuating Spring
Rod
Centering Spring Rod of the
Upper and Middle Servocontrols
Rods, Cables
Stops and Rigging Facilities

27-21-00

RUDDER MECHANICAL CONTROL


MAINTENANCE PRACTICES
Removal/Installation of the
control rod on the rudder
mechanical control

27-21-00

RUDDER MECHANICAL CONTROL


ADJUSTMENT/TEST
Operational Test of the Centering
Spring Rod
Adjustment of the Rudder
Mechanical Control
Functional Test of the Rudder
Mechanical Control
Functional Test of the Rudder
Mechanical Control after
Replacement of the Rudder
Hinge-Arm Fittings

27-21-00

C
_

____ ___________
PAGE
EFFECTIVITY
601 ALL
601 ALL
1
1
1

ALL
ALL
ALL

ALL

ALL

1
1
1
6
6
6

ALL
ALL
ALL
ALL
ALL
ALL

ALL

6
6

ALL
ALL

201
201

ALL
ALL

501
501

ALL
ALL

507

ALL

524

ALL

534

ALL

27-CONTENTS
R
AIJ

Page 4
Nov 01/10

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Adjustment of the Rudder
Control-Cables Length
Shortening of the Rudder Control
Cable
Cutting of the Rear Control Cable
of the Rudder
RUDDER MECHANICAL CONTROL
INSPECTION/CHECK
Visual Inspection of the Universal
Joint
Detailed Visual Inspection of the
Rudder Mechanical Control Cables
Check of the Tension of the Rudder
Mechanical-Control Cables with a
Tensiometer
Check of the Rudder Cable
Tension-Regulator (Pointer in the
Limits)
Detailed Visual Inspection of the
Rudder Mechanical Control-Linkage
in the Vertical Stabilizer
Detailed Inspection of the Rudder
Servocontrol Actuating Spring-Rod
and Rudder Servocontrol
Feedback-Rod Attachments
RUDDER
REMOVAL/INSTALLATION
Removal of the Rudder
Installation of the Rudder
RUDDER
INSPECTION/CHECK
Inspection/Check of the Rudder
PEDALS
REMOVAL/INSTALLATION
Removal of the CAPT Pedals
Installation of the CAPT Pedals
Removal of the F/O Pedals
Installation of the F/O Pedals
ADJUSTER ASSY - PEDAL POSITION
SERVICING
Lubrication of the Rack/Slider
Linkage of the Pedal Position
Adjuster
REMOVAL/INSTALLATION

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
540 ALL
552

ALL

559

ALL

601
601

ALL
ALL

605

ALL

613

ALL

617

ALL

624

ALL

627

ALL

401
401
418

ALL
ALL
ALL

601
601

ALL
ALL

401
401
406
409
415

ALL
ALL
ALL
ALL
ALL

301
301

ALL
ALL

401

ALL

27-21-00

27-21-41

27-21-41
27-21-42

27-21-43

27-CONTENTS
R
AIJ

Page 5
Nov 01/10

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Removal of the Pedal Position
Adjuster Assembly
Installation of the Pedal Position
Adjuster Assembly
BELLCRANK - YAW/BRAKE
REMOVAL/INSTALLATION
Removal of the CAPT Yaw/Brake
Bellcrank
Installation of the CAPT Yaw/Brake
Bellcrank
Removal of the F/O Yaw/Brake
Bellcrank
Installation of the F/O Yaw/Brake
Bellcrank
REGULATOR - CABLE TENSION
REMOVAL/INSTALLATION
Removal of the Cable Tension
Regulator Assy
Installation of the Cable Tension
Regulator Assy
Removal of the Cable Tension
Regulator (103CM)
Installation of the Cable Tension
Regulator (103CM)
QUADRANT - CABLE
REMOVAL/INSTALLATION
Removal of the Cable Quadrant
Installation of the Cable Quadrant
FRAME - RUDDER CONTROL
REMOVAL/INSTALLATION
Removal of the Rudder Control
Frame
Installation of the Rudder Control
Frame
CENTERING ROD - RUDDER CONTROL
REMOVAL/INSTALLATION
Removal of the Centering Rod of
the Rudder Control
Installation of the Centering Rod
of the Rudder Control
SPRING ROD
REMOVAL/INSTALLATION
Removal of the Spring Rod
Installation of the Spring Rod
SPRING ROD
INSPECTION/CHECK

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
407

ALL

401
401

ALL
ALL

407

ALL

413

ALL

418

ALL

401
401

ALL
ALL

408

ALL

414

ALL

417

ALL

401
401
409

ALL
ALL
ALL

401
401

ALL
ALL

410

ALL

401
401

ALL
ALL

407

ALL

401
401
406

ALL
ALL
ALL

601

ALL

27-21-44

27-21-45

27-21-46

27-21-47

27-21-48

27-21-49

27-21-49
27-CONTENTS

R
AIJ

Page 6
Nov 01/10

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Check of the Actuating Spring Rod
LINKAGE - RUDDER CONTROL
REMOVAL/INSTALLATION
Removal of the Rudder Control Rods
Installation of the Rudder Control
Rods
CABLES - RUDDER CONTROL
REMOVAL/INSTALLATION
Removal of the Rudder Control
Cables
Installation of the Rudder Control
Cables

CH/SE/SU
________

RUDDER TRIM ACTUATION


DESCRIPTION AND OPERATION
General
Component Location
Component Description
Rudder Trim Actuator
Maintenance
Control and Indicating
Control Panel

27-22-00

C
_

____ ___________
PAGE
EFFECTIVITY
601 ALL

27-21-52
401
401
416

ALL
ALL
ALL

401
401

ALL
ALL

413

ALL

1
1
1
6
6
6
7
7

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

401
401

ALL
ALL

401

ALL

404

ALL

404

ALL

501
501

ALL
ALL

508

ALL

513

ALL

517

ALL

27-21-61

RUDDER TRIM ACTUATION


DEACTIVATION/REACTIVATION
Deactivation of the Channel 1 of
the Rudder Trim Actuator
Refer to the MMEL TASK:
22-60-01-A)
Reactivation of the Channel 1 of
the Rudder Trim Actuator
Refer to the MMEL TASK:
22-60-01-A)

27-22-00

RUDDER TRIM ACTUATION


ADJUSTMENT/TEST
Adjustment of the Rudder Trim
Actuation
Operational Test of the Reset
Function
Operational Test of the Rudder
Trim Actuation
System Test of the Rudder Trim
ACTUATOR - RUDDER TRIM

27-22-00

27-22-51
27-CONTENTS

R
AIJ

Page 7
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Rudder Trim
Actuator (10CC)
Installation of the Rudder Trim
Actuator (10CC)
Removal of the Electronic Assembly
of the Rudder Trim Actuator (10CC)
Installation of the Electronic
Assembly of the Rudder Trim
Actuator (10CC)

CH/SE/SU
________

ARTIFICIAL FEEL AND RUDDER TRAVEL


LIMITING - ACTUATION
DESCRIPTION AND OPERATION
General
Rudder Artificial Feel
Rudder Travel Limiting
Component Location
Rudder Artificial Feel
Rudder Travel Limiting
Maintenance and Rigging
Facilities.
Component Description
Rudder-Travel Limitation Unit
(TLU)
Normal control circuit
Emergency control circuit
Test

27-23-00

ARTIFICIAL FEEL AND RUDDER TRAVEL


LIMITING - ACTUATION
DEACTIVATION/REACTIVATION
Deactivation of the Channel 1 of
the Rudder Travel Limitation Unit
Refer to the MMEL TASK:
22-60-01-A)
Reactivation of the Channel 1 of
the Rudder Travel Limitation Unit
Refer to the MMEL TASK:
22-60-01-A)

27-23-00

ARTIFICIAL FEEL AND RUDDER TRAVEL


LIMITING - ACTUATION
ADJUSTMENT/TEST

27-23-00

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL
415

ALL

428

ALL

434

ALL

1
1
1
1
2
2
7
9

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

9
9

ALL
ALL

9
11
11

ALL
ALL
ALL

401
401

ALL
ALL

401

ALL

404

ALL

404

ALL

501

ALL

27-CONTENTS
R
AIJ

Page 8
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Operational Test of the Rudder
Artificial-Feel Loads with Tool
(355M03200001)
Operational Test of the Rudder
Artificial-Feel Loads without Tool
Operational Test of the
Rudder-Travel Limitation Unit
SOLENOID - ARTIFICIAL FEEL UNLOCKING
REMOVAL/INSTALLATION
Removal of the Artificial Feel
Unlocking Solenoid 16CA
Installation of the Artificial
Feel Unlocking Solenoid 16CA
ARTIFICIAL FEEL AND TRIM UNIT
REMOVAL/INSTALLATION
Removal of the Artificial Feel and
Trim Unit
Installation of the Artificial
Feel and Trim Unit
LIMITATION UNIT - RUDDER TRAVEL
REMOVAL/INSTALLATION
Removal of the Rudder Travel
Limitation Unit 4CC
Installation of the Rudder
Travel-Limitation Unit 4CC
Removal of the Electronic Module
of the Rudder Travel Limitation
Unit
Installation of the Electronic
Module of the Rudder Travel
Limitation Unit

CH/SE/SU
________

RUDDER HYDRAULIC ACTUATION


DESCRIPTION AND OPERATION
General
Component Location
Hydraulic Supply (Ref. 27-00)
Component Description
Rudder Servocontrol
Operation
Normal operation with the
servocontrol pressurized
Operation on the ground with the
servocontrol depressurized
Maintenance, rigging facilities,
periodic tests

27-24-00

C
_

____ ___________
PAGE
EFFECTIVITY
501 ALL
510

ALL

517

ALL

401
401

ALL
ALL

409

ALL

401
401

ALL
ALL

409

ALL

401
401

ALL
ALL

407

ALL

415

ALL

420

ALL

1
1
1
3
3
3
3
3

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

ALL

ALL

27-23-17

27-23-41

27-23-51

27-CONTENTS
R
AIJ

Page 9
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Test
A single operational periodic
test is performed on the three
hydraulic systems (through the
use of leakage measurement
valves).

CH/SE/SU
________

RUDDER HYDRAULIC ACTUATION


ADJUSTMENT/TEST
Operational Test of the Rudder
Hydraulic Actuation
Operational Test of the Rudder
Servocontrols with Individual
Hydraulic System
Adjustment of the Rudder Neutral
Position

27-24-00

RUDDER HYDRAULIC ACTUATION


INSPECTION/CHECK
Check of the Rudder Servo Controls
and Hinge Bearings for too much
Play and Condition
Check of the Rudder Trailing Edge
Play
Visual Inspection of the Rudder
Servo Controls for Hydraulic
Leakage
SERVO CONTROL - RUDDER
REMOVAL/INSTALLATION
Removal of the Rudder Servo
Control 1025GM/2025GM/3025GM
Installation of the Rudder Servo
Control 1025GM/2025GM/3025GM
Removal of the Filter from the
Rudder Servo Control
1025GM/2025GM/3035GM
Installation of the Filter in the
Rudder Servo Control
1025GM/2025GM/3035GM
Removal of the Rudder Servo
Control Eye End
Installation of the Rudder Servo
Control Eye End
Replacement of the Rudder

27-24-00

C
_

____ ___________
PAGE
EFFECTIVITY
5 ALL
5 ALL

501
501

ALL
ALL

504

ALL

509

ALL

601
601

ALL
ALL

606

ALL

618

ALL

401
401

ALL
ALL

411

ALL

424

ALL

427

ALL

432

ALL

436

ALL

441

ALL

27-24-51

27-CONTENTS
R
AIJ

Page 10
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Servo-Control Bearings
SERVO CONTROL - RUDDER
INSPECTION/CHECK
Check of the Rudder Servo Control
Attachments

CH/SE/SU
________

RUDDER POSITION INDICATING


DESCRIPTION AND OPERATION
General

27-25-00

RUDDER POSITION INDICATING


ADJUSTMENT/TEST
Adjustment of the Rudder Position
Indicating
TRANSDUCER UNIT - RUDDER POSITION
REMOVAL/INSTALLATION
Removal of the Rudder Position
Transducer Unit 42WV
Installation of the Rudder
Position Transducer Unit 42WV
YAW DAMPER ACTUATION
DESCRIPTION AND OPERATION
General
Component Location
Component Description
Yaw Damper Servo-Actuator
Operation
Normal operation with the
actuator pressurized
Operation in case of a simple
electrical failure
Operation after a hydraulic
failure
Maintenance and rigging
facilities
YAW DAMPER ACTUATION
DEACTIVATION/REACTIVATION
Deactivation of the Yaw Damper
Servo-Actuator 3CC1 (3CC2)
Refer to the MMEL TASK: 22-63-01
Reactivation of the Yaw Damper
Servo-Actuator 3CC1 (3CC2)

C
_

PAGE ___________
____
EFFECTIVITY

27-24-51
601
601

ALL
ALL

1
1

ALL
ALL

501
501

ALL
ALL

401
401

ALL
ALL

406

ALL

1
1
1
1
1
2
2

ALL
ALL
ALL
ALL
ALL
ALL
ALL

ALL

ALL

ALL

401
401

ALL
ALL

401
407

ALL
ALL

27-25-00

27-25-17

27-26-00

27-26-00

27-CONTENTS
R
AIJ

Page 11
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________
Refer to the MMEL TASK: 22-63-01

YAW DAMPER ACTUATION


ADJUSTMENT/TEST
Operational Test of the Yaw Damper
Actuation
Adjustment of the Yaw Damper
Actuation
TRANSDUCER UNIT - YAW DAMPER POSITION
REMOVAL/INSTALLATION
Removal of the Yaw Damper Position
Transducer Unit 2CC
Installation of the Yaw Damper
Position Transducer Unit 2CC
CENTERING SPRING ROD - YAW DAMPER
SERVO ACTUATOR
REMOVAL/INSTALLATION
Removal of the Centering Spring
Rod for the Actuator of the Yaw
Damper Servo
Installation of the Centering
Spring Rod for the Actuator of the
Yaw Damper Servo
CENTERING SPRING ROD - YAW DAMPER
SERVO ACTUATOR
INSPECTION/CHECK
Removal of the Centering Spring
Rod of the Yaw Damper for Workshop
Test
SERVO ACTUATOR - YAW DAMPER
REMOVAL/INSTALLATION
Removal of the Yaw Damper Servo
Actuator (3CC1) and (3CC2)
Installation of the Yaw Damper
Servo Actuator (3CC1) and (3CC2)
Removal of the Servovalve
Installation of the Servovalve
Removal of the Solenoid Valve
Installation of the Solenoid Valve
Removal of the Pressure Switch
Installation of the Pressure
Switch
SERVO ACTUATOR - YAW DAMPER
INSPECTION/CHECK
Visual Inspection of the Yaw

C
_

____ ___________
PAGE
EFFECTIVITY
407 ALL

27-26-00
501
501

ALL
ALL

502

ALL

401
401

ALL
ALL

406

ALL

401
401

ALL
ALL

406

ALL

601
601

ALL
ALL

401
401

ALL
ALL

407

ALL

415
419
425
428
434
438

ALL
ALL
ALL
ALL
ALL
ALL

601
601

ALL
ALL

27-26-17

27-26-41

27-26-41

27-26-51

27-26-51

27-CONTENTS
R
AIJ

Page 12
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Damper Servo-Actuators

CH/SE/SU
________

________
ELEVATOR
DESCRIPTION AND OPERATION
General
Interface with the Autopilot
System (Ref. 22-70)

27-30-00

ELEVATOR AND HYDRAULIC ACTUATION


DESCRIPTION AND OPERATION
General
Component Location
Component Description
Elevator Servocontrol
Operation
General
Normal operation with the
servocontrol pressurized.
Operation after a simple
electrical failure.
Operation after a total
electrical failure.
Operation after a hydraulic
failure.
Special case
Maintenance and rigging
facilities.
Particular points.

27-34-00

ELEVATOR AND HYDRAULIC ACTUATION


DEACTIVATION/REACTIVATION
Elevator Servocontrol
Position-Transducer - Connection
of the Spare Transducer
Refer to the MMEL TASK:
27-34-02-A)
Reactivation of Elevator
Servocontrol Position-Transducer
Refer to the MMEL TASK:
27-34-02-A)

27-34-00

ELEVATOR AND HYDRAULIC ACTUATION


ADJUSTMENT/TEST
Operational Test of the Elevator

27-34-00

C
_

PAGE ___________
____
EFFECTIVITY

1
1
1

ALL
ALL
ALL

1
1
1
3
3
3
3
3

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

ALL

ALL

ALL

7
7

ALL
ALL

ALL

401
401

ALL
ALL

401

ALL

406

ALL

406

ALL

501
501

ALL
ALL

27-CONTENTS
R
AIJ

Page 13
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
and Hydraulic Actuation
Operational Test of the Centering
Function
Adjustment of the Elevator and
Hydraulic Actuation (with the
reference triangle on the tail
cone)
Adjustment of the Elevator and
Hydraulic Actuation after
Removal/Installation of one
Servocontrol
Adjustment of the Elevator and
Hydraulic Actuation to 0.5 Degrees
Nose-Up with the Gauge-Elevator
Neutral Setting (98D27309006000)
Adjustment of the Elevator and
Hydraulic Actuation to 0.5 Degrees
Nose-Up with the Gauge-Elevator
Neutral Setting (98D27309002000)
Electrical Test of the Elevator
Servo Controls

CH/SE/SU
________

ELEVATOR AND HYDRAULIC ACTUATION


INSPECTION/CHECK
Check of the Elevator Servo
Controls and Hinge Bearings for
too much Play and Condition
Check of the Position of the
Fluid-Reserve Piston of the
Elevator Servo Control with the
Hydraulic Reservoirs Depressurized
Check of the Differential-Pressure
Indicator and of the Position of
the Fluid- Reserve Piston of the
Elevator Servo Controls
Check of the Elevator Servo
Control Oscillations.
Check of the Position of the
Reference Triangle on the Tail
Cone
Removal of the Elevator Servo
Controls for Functional check of
the return relief valve in
workshop
Check of Elevator Neutral Position

27-34-00

C
_

PAGE ___________
____
EFFECTIVITY
507

ALL

515

ALL

527

ALL

535

ALL

558

ALL

580

ALL

601
601

ALL
ALL

614

ALL

619

ALL

626

ALL

631

ALL

635

ALL

636

ALL

27-CONTENTS
R
AIJ

Page 14
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
and Servo Control Installation
ELEVATOR
REMOVAL/INSTALLATION
Removal of the Elevator
Installation of the Elevator
ELEVATOR
INSPECTION/CHECK
In Service Wear Limits of the
Elevator Hinge Fittings
FILTER - HYDRAULIC
SERVICING
Servicing of the Elevator Servo
Control Actuator Filter
SERVO CONTROL - ELEVATOR
REMOVAL/INSTALLATION
Removal of the Elevator Servo
Control
Installation of the Elevator Servo
Control
Removal of the Elevator Servo
Control Actuator Servo Valve
Installation of the Elevator Servo
Control Actuator Servo Valve
Removal of the Elevator Servo
Control Actuator Solenoid Valve
Installation of the Elevator Servo
Control Actuator Solenoid Valve
Removal of the Elevator Servo
Control Actuator Mode Selector
Valve Transducer MSVT
Installation of the Elevator Servo
Control Actuator Mode Selector
Valve Transducer MSVT
Removal of the Servo Control
Actuator Eye-End
Installation of the Servo Control
Actuator Eye-End
SERVO CONTROL - ELEVATOR
INSPECTION/CHECK
In Service Wear Limits of the
Elevator Servo-Control
Attach-Fittings

CH/SE/SU
________

_____________________________________
TRIMMABLE
HORIZONTAL STABILIZER (THS)
DESCRIPTION AND OPERATION
General

27-40-00

C
_

PAGE ___________
____
EFFECTIVITY

27-34-41
401
401
410

ALL
ALL
ALL

601
601

ALL
ALL

301
301

ALL
ALL

401
401

ALL
ALL

410

ALL

419

ALL

426

ALL

432

ALL

438

ALL

444

ALL

450

ALL

455

ALL

460

ALL

601
601

ALL
ALL

1
1

ALL
ALL

27-34-41

27-34-42

27-34-51

27-34-51

27-CONTENTS
R
AIJ

Page 15
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______
______________________________________
TRIMMABLE HORIZONTAL STABILIZER (THS)
DEACTIVATION/REACTIVATION
Check of the synchronization
between pitch trim handwheel and
stabilizer
Refer to the MMEL TASK: 27-40-01
THS MECHANICAL CONTROL
DESCRIPTION AND OPERATION
General
Component Location
Component Description
Cable Tension Compensator
Stop and Rigging Facilities
Leading Particulars

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY

27-40-00
401
401

ALL
ALL

401

ALL

1
1
1
1
1
1
2

ALL
ALL
ALL
ALL
ALL
ALL
ALL

501
501

ALL
ALL

511

ALL

516

ALL

525

ALL

533

ALL

540

ALL

601
601

ALL
ALL

607

ALL

610

ALL

27-41-00

THS MECHANICAL CONTROL


ADJUSTMENT/TEST
Adjustment of the THS Zero
Position
Functional Test of the
THS-Actuator Overtravel Related to
the Mechanical Indicator
System Test of the THS Actuator
Electrical Control
Adjustment of the THS
Control-Cables Length
Shortening of the THS Control
Cable
Cutting of the Rear Control Cable
of the THS

27-41-00

THS MECHANICAL CONTROL


INSPECTION/CHECK
Detailed Visual Inspection of the
THS Mechanical Control
Visual Inspection of the
Pitch-Trim Control Wheel
Indicators
Check of the Cable Tension
Regulator of the THS Trim Control
(Pointer in the Limits)

27-41-00

27-CONTENTS
R
AIJ

Page 16
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Check of the Correct Tension of
the THS Mechanical Control Cables
Check of the Zero Adjustment of
the THS
Visual Inspection and Lubrication
of the Rear THS control cable
(between FR71 and the THS
actuator)
CONTROL MECHANISM - PITCH TRIM
REMOVAL/INSTALLATION
Removal of the Control
Mechanism-Pitch Trim
Installation of the Control
Mechanism-Pitch Trim
REGULATOR - CABLE TENSION
REMOVAL/INSTALLATION
Removal of the Cable Tension
Regulator
Installation of the Cable Tension
Regulator
Removal of the Springs of the
Cable Tension Regulator
Installation of the Springs of the
Cable Tension Regulator
STOP AND GEARSET UNIT - PITCH TRIM
CONTROL
REMOVAL/INSTALLATION
Removal of the Pitch Trim Control
Stop and Gearset Unit
Installation of the Pitch Trim
Control Stop and Gearset Unit
CABLES - THS CONTROL
REMOVAL/INSTALLATION
Removal of the THS Control Cables
Installation of the THS Control
Cables
DRIVE SHAFT - MECHANICAL INPUT
REMOVAL/INSTALLATION
Removal of the Mechanical Input
Drive Shaft Assy
Installation of the Mechanical
Input Drive Shaft Assy

CH/SE/SU
________

THS HYDRAULIC ACTUATION


DESCRIPTION AND OPERATION
General

27-44-00

C
_

____ ___________
PAGE
EFFECTIVITY
617 ALL
621

ALL

627

ALL

401
401

ALL
ALL

408

ALL

401
401

ALL
ALL

407

ALL

414

ALL

418

ALL

401
401

ALL
ALL

406

ALL

401
401
415

ALL
ALL
ALL

401
401

ALL
ALL

409

ALL

1
1

ALL
ALL

27-41-41

27-41-42

27-41-43

27-41-44

27-41-45

27-CONTENTS
R
AIJ

Page 17
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Component Location
System Description
Power Supply
Component Description
Hydraulic Motors
Fail-Safe Ball Screw-Jack
Control Valve Blocks
Gearbox
Pressure-Off Brakes
Pitch Trim Actuator
Position Transducer
Structural Components
Line Replaceable Units (LRU)
Technical Data
Operation
Normal Operation
Mechanical Control Operation
Ground Operation from the
Electric Pumps
Operation in Failure Conditions
Test
Ground Test
THS HYDRAULIC ACTUATION
ADJUSTMENT/TEST
Operational Test of the Jamming
Protection Device of the Trimmable
Horizontal Stabilizer Actuator
Operational Test of the Trimmable
Horizontal Stabilizer Actuator
with the Individual Hydraulic
Systems
Operational Test of the Trimmable
Horizontal Stabilizer Actuator
with both (Green and Yellow) and
Individual Hydraulic Systems
ACTUATOR - THS
REMOVAL/INSTALLATION
Removal of the Trimmable
Horizontal Stabilizer (THS)
Actuator (9CE)
Installation of the Trimmable
Horizontal Stabilizer (THS)
Actuator (9CE)
Removal of the Oil Filler Plug

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
1 ALL
1 ALL
6 ALL
6 ALL
6 ALL
6 ALL
7 ALL
7 ALL
8 ALL
8 ALL
8 ALL
8 ALL
9 ALL
9 ALL
10 ALL
10 ALL
14 ALL
14 ALL
14
15
15

ALL
ALL
ALL

501
501

ALL
ALL

523

ALL

527

ALL

401
401

ALL
ALL

419

ALL

443

ALL

27-44-00

27-44-51

27-CONTENTS
R
AIJ

Page 18
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
and/or the Oil Drain Plug from the
THS Actuator (9CE)
Installation of the Oil Filler
Plug and/or the Oil Drain Plug in
the THS Actuator (9CE)
Removal of the Lower Claw Stop
Installation of the Lower Claw
Stop
Replacement of the Filter Assy in
Valve Block of the THS Actuator
ACTUATOR - THS
ADJUSTMENT/TEST
Operational Test of the No-Back
Device (No-Back Pawls)
ACTUATOR - THS
INSPECTION/CHECK
Visual Inspection of the
THS-Actuator
Detailed Visual Inspection of the
the Ball-Screw Nut Body, the Screw
and the Claw Stops of the
THS-Actuator
Visual Check of the Threaded
(Fail-Safe) Nut
Check the Indicator of the No-Back
Wear Detection-Device of the
THS-Actuator
Check the Integrity of the Ball
Screw Shaft (Primary and Secondary
Load Paths) of the THS-Actuator
Detailed Visual Inspection of the
Upper and the Lower Attachments
(Primary and Secondary) of the
THS-Actuator
Check the Oil Level of the Gearbox
of the THS-Actuator
Check the Backlash between the
Ball Screw Nut and Screw of the
THS-Actuator
Inspection of the Magnetic Chip
Detector and Boroscope Inspection
of the Power Gear of the
THS-Actuator
Drain and Refill the Trimable
Horizontal Stabilizer Actuator
Gearbox

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
447

ALL

452
457

ALL
ALL

462

ALL

501
501

ALL
ALL

601
601

ALL
ALL

605

ALL

610

ALL

612

ALL

616

ALL

621

ALL

625

ALL

632

ALL

638

ALL

644

ALL

27-44-51

27-44-51

27-CONTENTS
R
AIJ

Page 19
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Detailed Inspection of THSA Lower
Attachments for Secondary Load
Path Loading
Detailed Inspection of THSA Upper
Attachments for Secondary Load
Path Loading
MOTOR - THS ACTUATOR
REMOVAL/INSTALLATION
Removal of the THS Actuator Motor
Installation of the THS Actuator
Motor
BRAKE - PRESSURE OFF, THS ACTUATOR
ADJUSTMENT/TEST
Functional Test of the
Pressure-Off Brakes
TRANSDUCER - THS ACTUATOR POSITION
REMOVAL/INSTALLATION
Removal of the Position Transducer
from the THS Actuator 9CE
Installation of the Position
Transducer to the THS Actuator 9CE
ACTUATOR - PITCH TRIM, THS
REMOVAL/INSTALLATION
Removal of the Pitch Trim Actuator
from the THS Actuator 9CE
Installation of the Pitch Trim
Actuator to the THS Actuator 9CE
Removal of the Electronic Modules
of the Pitch Trim Actuator
Installation of the Electronic
Modules of the Pitch Trim Actuator

CH/SE/SU
________

THS POSITION INDICATING


DESCRIPTION AND OPERATION
General

27-45-00

_____
FLAPS
DESCRIPTION AND OPERATION
General
System Configuration
Component Location
System Description
Electrical Control and
Monitoring System (Ref.
27-51-00)
Hydraulic Actuation and Power

27-50-00

C
_

____ ___________
PAGE
EFFECTIVITY
649 ALL
656

ALL

401
401
406

ALL
ALL
ALL

501
501

ALL
ALL

401
401

ALL
ALL

405

ALL

401
401

ALL
ALL

405

ALL

409

ALL

413

ALL

1
1

ALL
ALL

1
1
1
1
1
1

ALL
ALL
ALL
ALL
ALL
ALL

ALL

27-44-53

27-44-54

27-44-56

27-44-57

27-CONTENTS
R
AIJ

Page 20
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

Transmission (Ref. 27-54-00)


Power Supply
Interface
Component Description
Operation/Control and Indicating
Extension and Retraction of the
Flaps
Hydraulic Actuation and Power
Transmission
Asymmetry and Power Transmission
Monitoring
Position Indicating
BITE Test
______
FLAPS
MAINTENANCE PRACTICES
Extension of the Flaps on the
Ground
Extension of the Flaps/Slats on
the Ground
Manual Extension of the Flaps
Retraction of the Flaps on the
Ground
Retraction of the Flaps/Slats on
the Ground
Manual Retraction of the Flaps
Reset of the Torque Limiters of
the Flap System on the Ground
Installation of the Inboard and
Outboard Flap Hoisting-Sling
Removal of the Inboard and
Outboard Flap Hoisting-Sling
Installation of the Lock-Torque
Shaft - Flaps and Slats
(98D27504030001)
Removal of the Lock-Torque Shaft Flaps and Slats (98D27504030001)
Reset of the Wing Tip Brake (WTB)
of the Flap System on the Ground
FLAPS ELECTRICAL CONTROL AND MONITORING
DESCRIPTION AND OPERATION
General
Component Location
System Description

C
_

PAGE ___________
____
EFFECTIVITY
4
4
4
4
4

ALL
ALL
ALL
ALL
ALL

ALL

ALL

7
8

ALL
ALL

201
201

ALL
ALL

205

ALL

209
214

ALL
ALL

218

ALL

223
230

ALL
ALL

238

ALL

242

ALL

244

ALL

249

ALL

251

ALL

1
1
2
2

ALL
ALL
ALL
ALL

27-50-00

27-51-00

27-CONTENTS
R
AIJ

Page 21
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

Mechanical Input
Electrical Control
Wing Tip Brake (WTB) Control
Monitoring
Power Supply
Interfaces
Component Description
Slat/Flap Control Lever
Command Sensor Unit
Slat and Flap Control Computer
Valve Block
Feedback Position Pick-Off Unit
(FPPU)
Asymmetry Position Pick-Off Unit
(APPU)
Wing Tip Brake
Flap Interconnecting Strut
Operation/Control and Indicating
Normal Operation
Operation of the Wing Tip Brake
Monitoring for Failure
Conditions
Failure Table
Computer Behavior upon Power
Rise and Cutoff
Automatic Integrity Test (AIT)
Initialization and Cockpit
Repercussions
Parameter List
Description of the Parameter
List
SFCC Parameter List: 1B
FLAPS ELECTRICAL CONTROL AND
MONITORING
DEACTIVATION/REACTIVATION
Deactivation of the Slat and Flap
Control Computer (SFCC) No. 2 Flap
Channel
Refer to the MMEL TASK:
27-51-01-A)
Reactivation of the Slat and Flap
Control Computer (SFCC) No. 2 Flap
Channel
Refer to the MMEL TASK:

C
_

____ ___________
PAGE
EFFECTIVITY
2 ALL
6 ALL
8 ALL
8 ALL
13 ALL
13 ALL
13 ALL
13 ALL
14 ALL
23 ALL
27 ALL
27 ALL
30

ALL

30
30
34
34
37
39

ALL
ALL
ALL
ALL
ALL
ALL

47
49

ALL
ALL

49

ALL

50
50

ALL
ALL

53

ALL

401
401

ALL
ALL

401

ALL

408

ALL

408

ALL

27-51-00

27-CONTENTS
R
AIJ

Page 22
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

27-51-01-A)
Deactivation of the Slat and Flap
Control Computer (SFCC) No. 2 Slat
Channel
Refer to the MMEL TASK:
27-51-02-A)
Reactivation of the Slat and Flap
Control Computer (SFCC) No. 2 Slat
Channel
Refer to the MMEL TASK:
27-51-02-A)
Deactivation of the SFCC 2 Flap
WTB Solenoids
Refer to the MMEL TASK:
27-51-03-A)
Reactivation of the SFCC 2 Flap
WTB Solenoids
Refer to the MMEL TASK:
27-51-03-A)
FLAPS ELECTRICAL CONTROL AND
MONITORING
ADJUSTMENT/TEST
Read-out of Class 3 Faults in the
Flap System
Bite Test of the Slat and Flap
Control Computers (Flap System)
Operational Test of the Wing Tip
Brake and the Pressure Off Brake
Operational Test of the Wing Tip
Brake and the Pressure Off Brake
with the Ground Power Cart
Operational Test of the Wing Tip
Brake and the Pressure Off Brake
with the Engine Driven Pumps
Manual Adjustment of the Position
Pick-Off Units
Operational Test of the Flap
Interconnecting Strut and the
Flap-Attachment Failure-Detection
Sensors
Automatic Integrity Test of the
Slat and Flap Control Computers
To do a Check of the Flap Rigged
Position (with the Sharks Fin)

C
_

PAGE ___________
____
EFFECTIVITY
411

ALL

411

ALL

418

ALL

418

ALL

421

ALL

421

ALL

427

ALL

427

ALL

501
501

ALL
ALL

503

ALL

508

ALL

515

ALL

521

ALL

528

ALL

533

ALL

544

ALL

548

ALL

27-51-00

27-CONTENTS
R
AIJ

Page 23
May 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Adjustment of the Forward
Eccentrics to the Datum Position
Adjustment of the Flap Rigged
Position with the Sharks Fin Tool
(A318/319/320)
Adjustment of the Flap Rollers
SENSOR FLAP ATTACHMENT FAILURE
DETECTION
REMOVAL/INSTALLATION
Removal of the Proximity-Sensors
of the Interconnecting Strut
Installation of the
Proximity-Sensors of the
Interconnecting Strut
COMMAND SENSOR UNIT (CSU)
REMOVAL/INSTALLATION
Removal of the Command Sensor Unit
Installation of the Command Sensor
Unit
COMMAND SENSOR UNIT (CSU)
INSPECTION/CHECK
Removal and Workshop Check of the
Friction Brake of the Flap/Slat
Command Sensor Unit (CSU)
POSITION PICK OFF UNIT - ASYMMETRY
(APPU)
REMOVAL/INSTALLATION
Removal of the Asymmetry-Position
Pick-Off Unit 29CV (30CV)
Installation of the
Asymmetry-Position Pick-Off Unit
29CV (30CV)
POSITION PICK - OFF UNIT - FEED BACK
(FPPU)
REMOVAL/INSTALLATION
Removal of the Feed Back Position
Pick-Off Unit
Installation of the Feed Back
Position Pick-Off Unit
COMPUTER - SLAT AND FLAP CONTROL
(SFCC)
REMOVAL/INSTALLATION
Removal of the SFCC (21CV, 22CV)
Installation of the SFCC (21CV,
22CV)
LEVER - FLAP AND SLAT CONTROL

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
562 ALL
569

ALL

A505

ALL

401
401

ALL
ALL

403

ALL

401
401
406

ALL
ALL
ALL

601
601

ALL
ALL

401
401

ALL
ALL

407

ALL

401
401

ALL
ALL

404

ALL

401
401
404

ALL
ALL
ALL

27-51-15

27-51-17

27-51-17

27-51-18

27-51-19

27-51-34

27-51-43
27-CONTENTS

R
AIJ

Page 24
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Flap and Slat
Control Lever
Installation of the Flap and Slat
Control Lever
Removal of the Lighted Plate
Installation of the Lighted Plate
STRUT - INTERCONNECTING
REMOVAL/INSTALLATION
Removal of the Interconnecting
Strut
Installation of the
Interconnecting Strut
Removal of the Proximity-Sensor of
the Interconnecting Strut
Installation of the
Proximity-Sensor of the
Interconnecting Strut
STRUT - INTERCONNECTING
ADJUSTMENT/TEST
Adjustment of the Interconnecting
Strut
STRUT - INTERCONNECTING
INSPECTION/CHECK
Detailed Inspection of
Interconnecting Strut and
Attachments
Replacement of the Flap
Interconnecting Strut Rod-End and
Locking Device
BRAKE - WING TIP (WTB)
REMOVAL/INSTALLATION
Removal of the Flap Wing-Tip Brake
Installation of the Flap Wing-Tip
Brake
Removal of the Solenoid Valves of
the Flap Wing-Tip Brake (WTB)
Installation of the Solenoid
Valves of the Flap Wing-Tip Brake
(WTB)

CH/SE/SU
________

FLAPS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
DESCRIPTION AND OPERATION
General
Component Location

27-54-00

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL
406

ALL

410
413

ALL
ALL

401
401

ALL
ALL

405

ALL

413

ALL

419

ALL

501
501

ALL
ALL

601
601

ALL
ALL

613

ALL

401
401
407

ALL
ALL
ALL

418

ALL

423

ALL

1
1
1

ALL
ALL
ALL

27-51-44

27-51-44

27-51-44

27-51-51

27-CONTENTS
R
AIJ

Page 25
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
System Description
Hydraulic Actuation
Power Transmission
Power Supply
Interface
Component Description
Power Control Unit
Right Angle Gearbox
6203CM(6253CM)
Line Gearbox 6209CM(6259CM)
Bevel Gearbox 6217CM(6267CM)
Torque Shafts and Steady
Bearings
Actuator Track 1 6205CM(6255CM)
Actuator Track 2 6211CM(6261CM)
Actuator Track 3 6221CM(6271CM)
Actuator Track 4 6233CM(6283CM)
Flap Carriages
Flap and Track Fairing Operating
Mechanism
Operation/Control and Indicating
Hydraulic Actuation
Power Transmission
BITE

CH/SE/SU
________

FLAPS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
ADJUSTMENT/TEST
Operational Test of the Flap
System
Operational Test of the Flap and
Slat Systems
Adjustment of the Flap Drive
System

27-54-00

FLAPS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
INSPECTION/CHECK
Detailed Visual Inspection of the
Transmission Assembly (Including
Part of the Transmission in Zone
140)
Check of the Integrity of the Flap
Transmission System and Inspection

27-54-00

C
_

____ ___________
PAGE
EFFECTIVITY
5 ALL
5 ALL
5 ALL
9 ALL
9 ALL
10 ALL
10 ALL
23 ALL
23
23
23

ALL
ALL
ALL

29
35
39
44
47
47

ALL
ALL
ALL
ALL
ALL
ALL

49
49
50
51

ALL
ALL
ALL
ALL

501
501

ALL
ALL

506

ALL

512

ALL

601
601

ALL
ALL

612

ALL

27-CONTENTS
R
AIJ

Page 26
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
of the Seal Witness Drains of the
Wing Tip Brakes
Detailed Dimensional Check - Free
Movement at the Trailing Edge of
the Flaps
Visual Inspection of Inner Flap
Drive Trunnion Clamp-Type Steel
Rubbing Pads for Wear
Check of the Flap Drive System
Quantity Check of the Semi-Fluid
remaining in a Flap Rotary
Actuator (After Leakage)
GEARBOX - RIGHT ANGLE
REMOVAL/INSTALLATION
Removal of the Right Angle Gearbox
6203CM, (6253CM)
Installation of the Right Angle
Gearbox 6203CM, (6253CM)
STEADY BEARING ASSY
REMOVAL/INSTALLATION
Removal of the Steady Bearings FIN
6207CM(6257CM)/6213CM(6263CM)
Installation of the Steady
Bearings FIN
6207CM(6257CM)/6213CM(6263CM)
Removal of the Steady Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223
(6273CM)/6225CM(6275CM)/6229CM(627
Installation of the Steady
Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223
(6273CM)/6225CM(6275CM)/6229CM(627
TORQUE SHAFT ASSY - TRANSMISSION
REMOVAL/INSTALLATION
Removal of the Torque Shaft
6202CM(6252CM)
Installation of the Torque Shaft
6202CM(6252CM)
Removal of the Torque Shaft
6204CM(6254CM)
Installation of the Torque Shaft
6204CM(6254CM)
Removal of the Torque Shaft
6206CM(6256CM)
Installation of the Torque Shaft
6206CM(6256CM)

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
619

ALL

651

001-008,

660
672

ALL
ALL

401
401

ALL
ALL

407

ALL

401
401

ALL
ALL

405

ALL

411

ALL

415

ALL

401
401

ALL
ALL

408

ALL

415

ALL

418

ALL

425

ALL

430

ALL

27-54-41

27-54-44

27-54-45

27-CONTENTS
R
AIJ

Page 27
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Removal of the Torque Shaft
6208CM(6258CM)
Installation of the Torque Shaft
6208CM(6258CM)
Removal of the Torque Shaft
6210CM(6260CM)
Installation of the Torque Shaft
6210CM(6260CM)
Removal of the Torque Shaft
6212CM(6262CM)
Installation of the Torque Shaft
6212CM(6262CM)
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Installation of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Removal of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Installation of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Removal of Torque Shaft
6218CM(6268CM)
Installation of the Torque Shaft
6218CM(6268CM)
Removal of the Torque Shaft
6222CM(6272CM)
Installation of the Torque Shaft
6222CM(6272CM)
Removal of the Torque Shafts
6224CM(6274CM)/6230CM(6280CM)
Installation of the Torque Shafts
6224CM(6274CM)/6230CM(6280CM)
Removal of the Torque Shaft
6228CM(6278CM)
Installation of the Torque Shaft
6228CM(6278CM)
Removal of the Torque Shaft
6232CM(6282CM)
Installation of the Torque Shaft
6232CM(6282CM)
CARRIAGE
REMOVAL/INSTALLATION
Removal of the No.1 Flap Carriage
Installation of the No.1 Flap
Carriage
Removal of the Nos. 2, 3 and 4

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
437 ALL
442

ALL

448

ALL

452

ALL

459

ALL

462

ALL

468

ALL

472

ALL

480

ALL

484

ALL

491

ALL

496

ALL

A403

ALL

A406

ALL

A413

ALL

A418

ALL

A424

ALL

A428

ALL

A435

ALL

A439

ALL

401
401
406

ALL
ALL
ALL

411

ALL

27-54-46

27-CONTENTS
R
AIJ

Page 28
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Flap Carriages
Installation of the Nos 2, 3 and 4
Flap Carriages
Removal of the Pendulum of the No.
1 Flap Track Carriage
Installation of the Pendulum of
the No. 1 Flap Track Carriage
CARRIAGE
INSPECTION/CHECK
Detailed Visual Inspection of the
Flap Tracks and Rollers (as far as
is possible)
Detailed Inspection of the Flap
Carriage Rollers for In-Service
Wear
LINE GEARBOX
REMOVAL/INSTALLATION
Removal of the Line Gearbox
6209CM(6259CM)
Installation of the Line Gearbox
6209CM(6259CM)
BEVEL GEAR BOX
REMOVAL/INSTALLATION
Removal of the Bevel Gear Box
6217CM(6267CM)
Installation of the Bevel Gear Box
6217CM(6267CM)
ACTUATOR ASSY
REMOVAL/INSTALLATION
Removal of the Flap Track 1 to 4
Actuators
6205CM(6255CM)/6211CM(6261CM)/
6221CM(6271CM)/6233CM(6283CM)
Installation of the Flap Track 1
to 4 Actuators
6205CM(6255CM)/6211CM(6261CM)/
6221CM(6271CM)/6233CM(6283CM)
Removal of the Flap Track 1
Actuator 6205CM(6255CM)
Installation of the Flap Track 1
Actuator 6205CM(6255CM)
Removal of the Flap Track 2
Actuator 6211CM(6261CM)
Installation of the Flap Track 2
Actuator 6211CM(6261CM)
Removal of the Flap Track 3

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
415

ALL

423

ALL

428

ALL

601
601

ALL
ALL

608

ALL

401
401

ALL
ALL

405

ALL

401
401

ALL
ALL

406

ALL

401
401

ALL
ALL

408

ALL

415

ALL

423

ALL

435

ALL

443

ALL

454

ALL

27-54-46

27-54-47

27-54-48

27-54-49

27-CONTENTS
R
AIJ

Page 29
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Actuator 6221CM(6271CM)
Installation of the Flap Track 3
Actuator 6221CM(6271CM)
Removal of the Flap Track 4
Actuator 6233CM(6283CM)
Installation of the Flap Track 4
Actuator 6233CM(6283CM)
CONTROL UNIT - POWER (PCU) (FLAPS)
REMOVAL/INSTALLATION
Removal of the Power Control Unit
6201CM of the Flap System
Installation of the Power Control
Unit 6201CM of the Flap System
BRAKE - PRESSURE OFF, FLAPS PCU
REMOVAL/INSTALLATION
Removal of the Pressure-Off Brake
of the Flap Power Control Unit
Installation of the Pressure-Off
Brake of the Flap Power Control
Unit
VALVE BLOCK - FLAP PCU
REMOVAL/INSTALLATION
Removal of the Valve Blocks 23CV,
24CV of the Power Control Unit
(Flap)
Installation of the Valve Blocks
23CV, 24CV of the Power Control
Unit (Flap)
Removal of the Solenoid Valves of
the Power Control Unit (Flap)
Installation of the Solenoid
Valves of the Power Control Unit
(Flap)
Removal of the Filters of the
Valve Blocks
Installation of the Filters of the
Valve Blocks
MOTOR - HYDRAULIC, FLAPS PCU
REMOVAL/INSTALLATION
Removal of the Hydraulic Motor of
the Flap Power Control-Unit
(6201CM) with the Pressure-Off
Brake and the Valve Block Assembly
Installation of the Hydraulic
Motor of the Flap Power
Control-Unit (6201CM) with the

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
461

ALL

473

ALL

480

ALL

401
401

ALL
ALL

410

ALL

401
401

ALL
ALL

408

ALL

401
401

ALL
ALL

407

ALL

415

ALL

419

ALL

424

ALL

428

ALL

401
401

ALL
ALL

408

ALL

27-54-51

27-54-52

27-54-53

27-54-54

27-CONTENTS
R
AIJ

Page 30
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Pressure-Off Brake and the Valve
Block Assembly
Removal of the Hydraulic Motor of
the Flap Power Control-Unit
(6201CM) without the Pressure-Off
Brake and the Valve Block Assembly
Installation of the Hydraulic
Motor of the Flap Power
Control-Unit (6201CM) without the
Pressure-Off Brake and the Valve
Block Assembly
LEVER ASSY - FLAP ACTUATOR
REMOVAL/INSTALLATION
Removal of the Flap-Actuator Lever
Assembly - Tracks 1 and 2
Installation of the Flap-Actuator
Lever Assembly - Tracks 1 and 2
Removal of the Flap-Actuator Lever
Assembly - Track 3
Installation of the Flap-Actuator
Lever Assembly - Track 3
Removal of the Flap-Actuator Lever
Assembly - Track 4
Installation of the Flap-Actuator
Lever Assembly - Track 4
INBOARD FLAP
REMOVAL/INSTALLATION
Removal of the Inboard Flap
Installation of the Inboard Flap
Removal of the Flap Kink-Seals and
Cushion-Seals
Installation of the Flap
Kink-Seals and Cushion-Seals
Removal of the Inboard Flap Seals
Installation of the Inboard Flap
Seals
INBOARD FLAP
INSPECTION/CHECK
Dimensional Check of the Joints
that Connect the Flap Actuator
Levers to the Flap Drive Struts
(Tracks 1 and 2)
OUTBOARD FLAP
REMOVAL/INSTALLATION
Removal of the Outboard Flap
Installation of the Outboard Flap

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
417

ALL

422

ALL

401
401

ALL
ALL

409

ALL

420

ALL

426

ALL

435

ALL

441

ALL

401
401
418
435

ALL
ALL
ALL
ALL

440

ALL

447
451

ALL
ALL

601
601

ALL
ALL

401
401
413

ALL
ALL
ALL

27-54-55

27-54-61

27-54-61

27-54-62

27-CONTENTS
R
AIJ

Page 31
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Removal of the Leading Edge Panels
2 and 5 on the Outboard Flap
Installation of the Leading Edge
Panels 2 and 5 on the Outboard
Flap
OUTBOARD FLAP
INSPECTION/CHECK
Dimensional Check of the Joints
that connect the Flap Actuator
Levers to the Flap Drive Struts
(Tracks 3 and 4)
ROLLER ASSY - FLAP GUIDE
REMOVAL/INSTALLATION
Removal of the Flap Guide-Roller
Assembly
Installation of the Flap
Guide-Roller Assembly

CH/SE/SU
________

FLAPS POSITION INDICATING


DESCRIPTION AND OPERATION
General
Component Location
System Description
Power Supply
Interface
Component Description
Instrumentation Position
Pickoff-Unit (IPPU)
Operation/Control and Indicating
Flap Protection
No Data at the Data Management
Computer (DMC) Input
Bite
POSITION PICK-OFF UNIT INSTRUMENTATION (IPPU)
REMOVAL/INSTALLATION
Removal of the Instrumentation
Position Pick-Off Unit
Installation of the
Instrumentation Position Pick-Off
Unit

27-55-00

_______
SPOILER
DESCRIPTION AND OPERATION
General
System Description

27-60-00

C
_

____ ___________
PAGE
EFFECTIVITY
432 ALL
436

ALL

601
601

ALL
ALL

401
401

ALL
ALL

406

ALL

1
1
1
1
5
5
5
5

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

6
7
7

ALL
ALL
ALL

ALL

401
401

ALL
ALL

404

ALL

1
1
1

ALL
ALL
ALL

27-54-62

27-54-63

27-55-11

27-CONTENTS
R
AIJ

Page 32
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________
Roll Function
Speedbrake Function
Ground Spoilers

________
SPOILER
MAINTENANCE PRACTICES
Extension-Retraction of the
Spoilers for Maintenance

C
_

____ ___________
PAGE
EFFECTIVITY
1 ALL
2 ALL
2 ALL

27-60-00

SPOILER HYDRAULIC ACTUATION


DESCRIPTION AND OPERATION
General
Component Location
Hydraulic Supply (Ref. 27-00)
Component Description
Servocontrols of Spoilers 1 thru
5
Operation
Normal operation with the
servocontrol pressurized
Operation after an electrical
failure
Operation after a hydraulic
failure
Operation in case of high
pressure decrease
Operation on the ground with the
servocontrol depressurized
Maintenance and rigging
facilities

27-64-00

SPOILER HYDRAULIC ACTUATION


DEACTIVATION/REACTIVATION
Deactivation of the Spoiler Servo
Control
Refer to the MMEL TASK:
27-64-0X-A)
Reactivation of the Spoiler Servo
Control
Refer to the MMEL TASK:
27-64-0X-A)

27-64-00

SPOILER HYDRAULIC ACTUATION

27-64-00

201
201

ALL
ALL

1
1
1
3
3
3

ALL
ALL
ALL
ALL
ALL
ALL

3
3

ALL
ALL

ALL

ALL

ALL

ALL

ALL

401
401

ALL
ALL

401

ALL

408

ALL

408

ALL

27-CONTENTS
R
AIJ

Page 33
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
ADJUSTMENT/TEST
Operational Test of the Spoiler
Hydraulic Actuation
Adjustment of the Spoilers
Electrical Test of the spoiler
Servo Controls
SPOILER HYDRAULIC ACTUATION
INSPECTION/CHECK
Check of the Spoilers Servo
Controls and Hinge Bearings for
Excessive Play and Condition
SPOILER 1
REMOVAL/INSTALLATION
Removal of the Spoiler 1
Installation of the Spoiler 1
SPOILER 1
INSPECTION/CHECK
Inspection/Check of the Spoiler 1
SPOILER 2
REMOVAL/INSTALLATION
Removal of the Spoiler 2
Installation of the Spoiler 2
Removal of the Link-Spoiler 2
Installation of the Link-Spoiler 2
SPOILER 2
INSPECTION/CHECK
Inspection/Check of the Spoiler 2
SPOILER 3
REMOVAL/INSTALLATION
Removal of the Spoiler 3
Installation of the Spoiler 3
Removal of the Link-Spoiler 3
Installation of the Link-Spoiler 3
SPOILER 3
INSPECTION/CHECK
Inspection/check of the Spoiler 3
SPOILER 4
REMOVAL/INSTALLATION
Removal of the Spoiler 4
Installation of the Spoiler 4
Removal of the Link-Spoiler 4
Installation of the Link-Spoiler 4
SPOILER 4
INSPECTION/CHECK

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
501 ALL
501 ALL
508
521

ALL
ALL

601
601

ALL
ALL

401
401
410

ALL
ALL
ALL

601
601

ALL
ALL

401
401
409
419
424

ALL
ALL
ALL
ALL
ALL

601
601

ALL
ALL

401
401
406
418
423

ALL
ALL
ALL
ALL
ALL

601
601

ALL
ALL

401
401
409
419
424

ALL
ALL
ALL
ALL
ALL

601

ALL

27-64-00

27-64-41

27-64-41
27-64-42

27-64-42
27-64-43

27-64-43
27-64-44

27-64-44
27-CONTENTS

R
AIJ

Page 34
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Inspection/Check of the Spoiler 4
SPOILER 5
REMOVAL/INSTALLATION
Removal of the Spoiler 5
Installation of the Spoiler 5
Removal of the Link-Spoiler 5
Installation of the Link-Spoiler 5
SPOILER 5
INSPECTION/CHECK
Inspection/Check of the Spoiler 5
CHECK VALVE
REMOVAL/INSTALLATION
Removal of the Check Valve
3626GM(3627GM)
Installation of the Check Valve
3626GM(3627GM)
SERVO CONTROL - SPOILER
REMOVAL/INSTALLATION
Removal of the Spoiler
Servo-Control 31CE1 thru 31CE10
Installation of the Spoiler
Servo-Control 31CE1 thru 31CE10
Removal of the Servo-Valve from
the Spoiler Servo-Control
Installation of the Servo-Valve on
the Spoiler Servo-Control
Removal of the Filter
Installation of the Filter

CH/SE/SU
________

_______________
LIFT
AUGMENTING
DESCRIPTION AND OPERATION
General
System Configuration
Component Location
System Description
Electrical Control and
Monitoring (Ref. 27-81-00)
Hydraulic Actuation and Power
Transmission (Ref. 27-84-00)
Power Supply
Interface
Component Description
Operation/Control and Indicating
Extension and Retraction of the
Slats
Hydraulic Actuation and Power

27-80-00

C
_

____ ___________
PAGE
EFFECTIVITY
601 ALL

27-64-45
401
401
407
417
422

ALL
ALL
ALL
ALL
ALL

601
601

ALL
ALL

401
401

ALL
ALL

406

ALL

401
401

ALL
ALL

413

ALL

427

ALL

432

ALL

439
444

ALL
ALL

1
1
1
1
1
1

ALL
ALL
ALL
ALL
ALL
ALL

ALL

4
4
4
6
6

ALL
ALL
ALL
ALL
ALL

ALL

27-64-45
27-64-48

27-64-51

27-CONTENTS
R
AIJ

Page 35
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

Transmission
Asymmetry and Power Transmission
Monitoring
Position Indicating
BITE Test
________________
LIFT AUGMENTING
MAINTENANCE PRACTICES
Extending the Slats on the Ground
Manual Extension of the Slats
Retracting the Slats on the Ground
Manual Retraction of the Slats
Reset of the Torque Limiters of
the Slat System on the Ground
Installation of the Hoisting Sling
Removal of the Hoisting Sling
Reset of the Wing Tip Brake (WTB)
of the Slat System on the Ground

27-80-00

SLATS ELECTRICAL CONTROL AND MONITORING


DESCRIPTION AND OPERATION
General
Component Location
System Description
Mechanical Input
Electrical Control
Wing Tip Brake (WTB) Control
Monitoring
Power Supply
Interfaces
Component Description
Refer to (Ref. 27-51-00) for
data on:
Valve Block
Feedback Position Pick-off Unit
(FPPU)
Asymmetry Position Pick-off Unit
(APPU)
Adapter Plate
Wing Tip Brake
Operation/Control and Indicating
Normal Operation
Slat Alpha Lock/Speed Baulk
Operation of the Wing Tip Brake
Monitoring for Failure

27-81-00

C
_

PAGE ___________
____
EFFECTIVITY
7

ALL

7
7

ALL
ALL

201
201
205
211
215
221

ALL
ALL
ALL
ALL
ALL
ALL

228
232
235

ALL
ALL
ALL

1
1
2
2
2
6
6
9
12
12
12
12

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

18
18

ALL
ALL

18

ALL

18
18
18
18
26
26
28

ALL
ALL
ALL
ALL
ALL
ALL
ALL

27-CONTENTS
R
AIJ

Page 36
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

Conditions
Failure Table
Parameter List
BITE
SLATS ELECTRICAL CONTROL AND
MONITORING
DEACTIVATION/REACTIVATION
Deactivation of the SFCC 2 Slat
WTB Solenoids
Refer to the MMEL TASK:
27-81-01-A)
Reactivation of the SFCC 2 Slat
WTB Solenoids
Refer to the MMEL TASK:
27-81-01-A)

27-81-00

SLATS ELECTRICAL CONTROL AND


MONITORING
ADJUSTMENT/TEST
Read-out for Class 3 Faults in the
Slat System
Bite Test of the Slat and Flap
Control Computers (Slat System)
Operational Test of the Wing-Tip
Brake and the Pressure-Off Brake
Operational Test of the Wing-Tip
Brake and the Pressure-Off Brake
with the Ground Power Cart
Operational Test of the Wing-Tip
Brake and the Pressure-Off Brake
with the Engine Driven Pumps
Manual Adjustment of the Position
Pick-Off Units
POSITION PICK OFF UNIT - ASYMMETRY
(APPU)
REMOVAL/INSTALLATION
Removal of the Asymmetry-Position
Pick-Off Unit 31CV (32CV)
Installation of the
Asymmetry-Position Pick-Off Unit
31CV (32CV)
POSITION PICK - OFF UNIT - FEED BACK
(FPPU)

27-81-00

C
_

PAGE ___________
____
EFFECTIVITY
34
35
35

ALL
ALL
ALL

401
401

ALL
ALL

401

ALL

404

ALL

404

ALL

501
501

ALL
ALL

503

ALL

509

ALL

517

ALL

524

ALL

531

ALL

401
401

ALL
ALL

405

ALL

27-81-18

27-81-19
27-CONTENTS

R
AIJ

Page 37
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Feed Back Position
Pick-Off Unit
Installation of the Feed Back
Position Pick-Off Unit
ADAPTOR PLATE - PPU
REMOVAL/INSTALLATION
Removal of the PPU Adaptor Plate
6048CM(6098CM)
Installation of the PPU Adaptor
Plate 6048CM(6098CM)
BRAKE - WING TIP (WTB)
REMOVAL/INSTALLATION
Removal of the Slat Wing-Tip Brake
Installation of the Slat Wing-Tip
Brake
Removal of the Solenoid Valve from
the Slat Wing-Tip Brake (WTB)
Installation of the Solenoid Valve
to the Slat Wing-Tip Brake (WTB)

CH/SE/SU
________

SLATS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
DESCRIPTION AND OPERATION
General
Component Location
System Description
Hydraulic Actuation
Power Transmission
Power Supply
Interface
Component Description
Power Control Unit (6001CM)
Bevel Gearbox, 19 degree
(6003CM)
Tee Gearbox (6005CM)
Bevel Gearbox, 63.5 degree
(6009CM/6059CM, 6011CM/6061CM)
Torque Shafts and Steady
Bearings
Actuator
Tracks
Operation/Control and Indicating
Hydraulic Actuation
Power Transmission
Bite

27-84-00

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL
404

ALL

401
401

ALL
ALL

405

ALL

401
401
407

ALL
ALL
ALL

416

ALL

420

ALL

1
1
1
7
7
9
12
12
12
12
24

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

24
24

ALL
ALL

28

ALL

28
35
35
35
37
37

ALL
ALL
ALL
ALL
ALL
ALL

27-81-42

27-81-51

27-CONTENTS
R
AIJ

Page 38
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

SLATS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
ADJUSTMENT/TEST
Operational Test of the Slat
System

27-84-00

SLATS HYDRAULIC ACTUATION AND POWER


TRANSMISSION
INSPECTION/CHECK
Detailed Visual Inspection of the
Slat Transmission System
Detailed Visual Inspection of the
Slat Track Rollers, the Pinions
and the Curved Rack Gears (As Far
As Visible)
Check of Slat Transmission Shaft
Integrity Including Inspection of
Seal Witness Drains
Operational Test of Wingtip
Brakes/Pressure-Off Brakes,
Followed by Check of Transmission
Shafting Integrity and Inspection
of Seal Witness Drains
GEARBOX - BEVEL 19 DEG
REMOVAL/INSTALLATION
Removal of the Bevel Gearbox
6003CM
Installation of the Bevel Gearbox
6003CM
GEARBOX - TEE
REMOVAL/INSTALLATION
Removal of the Tee Gearbox 6005CM
Installation of the Tee Gearbox
6005CM
GEARBOX - BEVEL 63.5 DEG
REMOVAL/INSTALLATION
Removal of the Bevel Gearbox 63.5
6009CM, 6011CM (6059CM, 6061CM)
Installation of the Bevel Gearbox
63.5 6009CM, 6011CM (6059CM,
6061CM)
STEADY BEARING ASSY - TRANSMISSION
REMOVAL/INSTALLATION

27-84-00

C
_

PAGE ___________
____
EFFECTIVITY

501
501

ALL
ALL

601
601

ALL
ALL

611

ALL

618

ALL

627

ALL

401
401

ALL
ALL

406

ALL

401
401
407

ALL
ALL
ALL

401
401

ALL
ALL

406

ALL

401

ALL

27-84-41

27-84-42

27-84-43

27-84-44
27-CONTENTS

R
AIJ

Page 39
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Removal of the Steady Bearing FIN
6007CM(6057CM)
Installation of the Steady Bearing
FIN 6007CM(6057CM)
Removal of the Steady Bearings FIN
6017CM(6067CM)/6019CM(6069CM)
Installation of the Steady
Bearings FIN
6017CM(6067CM)/6019CM(6069CM)
Removal of the Steady Bearing FIN
6021CM(6071CM)
Installation of the Steady Bearing
FIN 6021CM(6071CM)
Removal of the Steady Bearing FIN
6023CM(6073CM)
Installation of the Steady Bearing
FIN 6023CM(6073CM)
Removal of the Steady Bearing FIN
6025CM(6075CM)
Installation of the Steady Bearing
FIN 6025CM(6075CM)
Removal of the Steady Bearing FIN
6031CM(6081CM)
Installation of the Steady Bearing
FIN 6031CM(6081CM)
TORQUE SHAFT ASSY - TRANSMISSION
REMOVAL/INSTALLATION
Removal of the Torque Shaft
6002CM(6004CM)
Installation of the Torque Shaft
6002CM(6004CM)
Removal of the Torque Shaft
6006CM(6056CM)
Installation of the Torque Shaft
6006CM(6056CM)
Removal of the Torque Shaft
6008CM(6058CM)
Installation of the Torque Shaft
6008CM(6058CM)
Removal of the Torque Shaft
6010CM(6060CM)
Installation of the Torque Shaft
6010CM(6060CM)
Removal of the Torque Shaft
6012CM(6062CM)
Installation of the Torque Shaft

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
405

ALL

410

ALL

414

ALL

419

ALL

422

ALL

427

ALL

430

ALL

435

ALL

438

ALL

443

ALL

446

ALL

401
401

ALL
ALL

406

ALL

411

ALL

414

ALL

419

ALL

422

ALL

427

ALL

430

ALL

436

ALL

440

ALL

27-84-45

27-CONTENTS
R
AIJ

Page 40
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
6012CM(6062CM)
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036
6038CM(6088CM)/6040CM(6090CM)/6042
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036
(6086CM)/6038CM(6088CM)/6040CM(609
M(6094CM)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026
6030CM(6080CM)
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026
(6076CM)/6030CM(6080CM)
Removal of the Torque Shaft
6018CM(6068CM)
Installation of the Torque Shaft
6018CM(6068CM)
Removal of the Torque Shaft
6022CM(6072CM)
Installation of the Torque Shaft
6022CM(6072CM)
Removal of the Torque Shaft
6024CM(6074CM)
Installation of the Torque Shaft
6024CM(6074CM)
Removal of the Torque Shaft
6032CM(6082CM)
Installation of the Torque Shaft
6032CM(6082CM)
Removal of the Torque Shaft
6034CM(6084CM)
Installation of the Torque Shaft
6034CM(6084CM)
Removal of the Torque Shaft
6046CM(6096CM)
Installation of the Torque Shaft
6046CM(6096CM)
ACTUATOR ASSY - TYPE A
REMOVAL/INSTALLATION
Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Installation of the Type A
Actuators
6013CM(6063CM)/6015CM(6065CM)
ACTUATOR ASSY - TYPE B

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
447

ALL

451

ALL

459

ALL

463

ALL

470

ALL

474

ALL

479

ALL

482

ALL

487

ALL

490

ALL

496

ALL

499

ALL

A404

ALL

A407

ALL

A412

ALL

A415

ALL

401
401

ALL
ALL

407

ALL

27-84-48

27-84-49
27-CONTENTS

R
AIJ

Page 41
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035
(6085CM)/6039CM(6089CM)/6045CM(609
Installation of the Type B
Actuators
6027CM(6077CM)/6029CM(6079CM)/6035
(6085CM)/6039CM(6089CM)/6045CM(609
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041
(6091CM)
Installation of the Type B
Actuators
6033CM(6083CM)/6037CM(6087CM)/
6041CM(6091CM)
CONTROL UNIT - POWER (PCU) (SLATS)
REMOVAL/INSTALLATION
Removal of the Power Control Unit
6001CM of the Slat System
Installation of the Power Control
Unit 6001CM of the Slat System
BRAKE - PRESSURE OFF, SLATS PCU
REMOVAL/INSTALLATION
Removal of the Pressure-Off Brake
of the Slat Power Control Unit
Installation of the Pressure-Off
Brake of the Slat Power Control
Unit
VALVE BLOCK - SLAT PCU
REMOVAL/INSTALLATION
Removal of the Valve Blocks 25CV,
26CV of the Power Control Unit
(Slat)
Installation of the Valve Blocks
25CV, 26CV of the Power Control
Unit (Slat)
Removal of the Solenoid Valves of
the Power Control Unit (Slat)
Installation of the Solenoid
Valves of the Power Control Unit
(Slat)
Removal of the Filters of the
Valve Blocks
Installation of the Filters of the
Valve Blocks
MOTOR - HYDRAULIC, SLAT PCU

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL
408

ALL

418

ALL

423

ALL

401
401

ALL
ALL

409

ALL

401
401

ALL
ALL

407

ALL

401
401

ALL
ALL

407

ALL

416

ALL

420

ALL

425

ALL

429

ALL

27-84-51

27-84-52

27-84-53

27-84-54
27-CONTENTS

R
AIJ

Page 42
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Hydraulic Motor of
the Slat Power Control Unit
(6001CM) with the Pressure-Off
Brake and the Valve Block Assembly
Installation of the Hydraulic
Motor of the Slat Power Control
Unit (6001CM) with the
Pressure-Off Brake and the Valve
Block Assembly
Removal of the Hydraulic Motor of
the Slat Power Control Unit
(6001CM) without the Pressure-Off
Brake and the Valve Block Assembly
Installation of the Hydraulic
Motor of the Slat Power Control
Unit (6001CM) without the
Pressure-Off Brake and the Valve
Block Assembly
TRACK - SLAT 1
REMOVAL/INSTALLATION
Removal of the Slat Tracks 1 thru
4
Installation of the Slat Tracks 1
thru 4
Removal of the Side-Rollers - Slat
Tracks 1 thru 4
Installation of the Side-Rollers Slat Tracks 1 thru 4
TRACK - SLAT 1
INSPECTION/CHECK
Dimensional Check of the
Slat-to-Track Attachment Fittings,
Tracks 1 Thru 4
Check of Slat 1 Trailing Edge
Backlash
TRACK - SLAT 2, 3, 4, 5
REMOVAL/INSTALLATION
Removal of the Slat Tracks 5 thru
12
Installation of the Slat Tracks 5
thru 12
Removal of the Side Rollers - Slat
Tracks 5 thru 12
Installation of the Side Rollers Slat Tracks 5 thru 12

CH/SE/SU
________

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL

407

ALL

416

ALL

420

ALL

401
401

ALL
ALL

405

ALL

418

ALL

421

ALL

601
601

ALL
ALL

622

ALL

401
401

ALL
ALL

405

ALL

420

ALL

423

ALL

27-84-61

27-84-61

27-84-62

27-CONTENTS
R
AIJ

Page 43
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
TRACK - SLAT 2, 3, 4, 5
INSPECTION/CHECK
Dimensional Check of the
Slat-To-Track Attachment Fittings,
Tracks 5 Thru 12
Check of Slat 2, 3, 4 and 5
Trailing Edge Backlash
SLAT 1
REMOVAL/INSTALLATION
Removal of the No. 1 Slat
Installation of the No. 1 Slat
SLAT 2
REMOVAL/INSTALLATION
Removal of the No. 2 Slat
Installation of the No. 2 Slat
SLAT 3
REMOVAL/INSTALLATION
Removal of the No. 3 Slat
Installation of the No. 3 Slat
SLAT 4
REMOVAL/INSTALLATION
Removal of the No. 4 Slat
Installation of the No. 4 Slat
SLAT 5
REMOVAL/INSTALLATION
Removal of the No. 5 Slat
Installation of the No. 5 Slat
PINION ASSEMBLY - SLAT TRACKS
REMOVAL/INSTALLATION
Removal of the Slat-Track Pinion
Assembly
Installation of the Slat-Track
Pinion Assembly
PINION ASSEMBLY - SLAT TRACKS
REPAIRS
Repair of Damaged Flanks of the
Teeth of the Slat Track Pinions
and Gear Racks
CLOSING PLATES - SLAT TRACKS
REMOVAL/INSTALLATION
Removal of the Closing Plates for
the Slat Tracks 1 thru 12
Installation of the Closing Plates
for the Slat Tracks 1 thru 12

________
CH/SE/SU
27-84-62

SLATS POSITION INDICATING

27-85-00

C
_

PAGE ___________
____
EFFECTIVITY
601
601

ALL
ALL

670

ALL

401
401
412

ALL
ALL
ALL

401
401
409

ALL
ALL
ALL

401
401
410

ALL
ALL
ALL

401
401
409

ALL
ALL
ALL

401
401
410

ALL
ALL
ALL

401
401

ALL
ALL

409

ALL

801
801

ALL
ALL

401
401

ALL
ALL

410

ALL

27-84-63

27-84-64

27-84-65

27-84-66

27-84-67

27-84-68

27-84-68

27-84-69

27-CONTENTS
R
AIJ

Page 44
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
DESCRIPTION AND OPERATION
General
Component Location
System Description
Power Supply
Interface
Component Description
Instrumentation Position
Pickoff-Unit (IPPU)
Operation/Control and Indicating
Slat Protection
No Data at the Data Management
Computer (DMC) Input
Bite
POSITION PICK-OFF UNIT INSTRUMENTATION (IPPU)
REMOVAL/INSTALLATION
Removal of the Instrumentation
Position Pick-Off Unit
Installation of the
Instrumentation Position Pick-Off
Unit

CH/SE/SU
________

_______________________________________
ELECTRICAL
FLIGHT CONTROL SYSTEM (EFCS)
DESCRIPTION AND OPERATION
General
Component Location
System Description
Flight Control Surfaces
Power Supply
Hydraulic Power Supply
Electrical Power Supply
Functions Performed in Normal
Configuration
Pitch Control
Lateral Control
Speedbrake Function
Ground Spoiler Function
Ground Spoiler Function
Normal Configuration
Functional Reconfiguration
Law Reconfiguration
Law Distribution in the
Computers
Functional Statuses
Logic of Transition between

27-90-00

C
_

____ ___________
PAGE
EFFECTIVITY
1 ALL
1 ALL
1 ALL
1 ALL
4 ALL
4 ALL
4 ALL
4 ALL
6
7
7

ALL
ALL
ALL

ALL

401
401

ALL
ALL

404

ALL

1
1
1
4
4
4
4
4
13

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

13
21
23
25
28
30
31
31
33

ALL
ALL
ALL
001-008, 013-100
009-012,
ALL
ALL
ALL
ALL

33
33

ALL
ALL

27-85-11

27-CONTENTS
R
AIJ

Page 45
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

Different Statuses
System Reconfiguration Logic
Switching Logics
Conditions Related to the
Computer Status
Conditions Related to Servoloops
Conditions Related to Hydraulic
Systems
Conditions Related to Sensor
Status
Miscellaneous Logics
Priority between Side-Sticks
logic
Elevator-Servocontrol
Simultaneous-Pressurization
Logic
Elevator Oscillation Detection
Detection of a Manual Action on
the Pitch-Trim Control Wheel
THS Ground-Setting Logic
Flight/Ground Logic computed in
the ELACs
CONTROL INPUTS INTERFACE AND POWER
SUPPLY
DESCRIPTION AND OPERATION
General
Component Location
Operation
Side Stick Controller
Speedbrake Control Transducer
Unit
Transducer Unit
Accelerometer
FTU (74CE)
Hydraulic Pressure Switches
(10CE1, 10CE2, 10CE3)
Throttle Control Unit
CONTROL INPUTS INTERFACE AND POWER
SUPPLY
DEACTIVATION/REACTIVATION
Operational Test of the Thrust
Reverser System
Refer to the MMEL TASK: 27-92-02

C
_

PAGE ___________
____
EFFECTIVITY
34
34
34

ALL
ALL
ALL

34
35

ALL
ALL

35

ALL

36
36

ALL
ALL

36

ALL

37
37

ALL
ALL

37
37

ALL
ALL

1
1
1
10
10
16

ALL
ALL
ALL
ALL
ALL
ALL

19
19
20
20

ALL
ALL
ALL
ALL

27

ALL

401
401

ALL
ALL

401

ALL

27-92-00

27-92-00

27-CONTENTS
R
AIJ

Page 46
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
TRANSDUCER UNIT - ELEVATOR POSITION
REMOVAL/INSTALLATION
Removal of the Elevator Position
Transducer-Unit 49CE1, 49CE2
Installation of the Elevator
Position Transducer-Unit 49CE1,
49CE2
LEVER - SPEED BRAKE CONTROL ASSEMBLY
REMOVAL/INSTALLATION
Removal of the Speedbrake Control
Transducer Unit (7CE)
Installation of the Speedbrake
Control Transducer Unit (7CE)
Removal of the Lighted Plate
Installation of the Lighted Plate
TRANSDUCER UNIT - PEDAL POSITION
REMOVAL/INSTALLATION
Removal of the Pedal Position
Transducer Unit (25CE1, 25CE2)
Installation of the Pedal Position
Transducer Unit (25CE1, 25CE2)
ACCELEROMETER - FLIGHT CONTROL
REMOVAL/INSTALLATION
Removal of the Flight Control
Accelerometer (12CE1, 12CE2,
12CE3, 12CE4)
Installation of the Flight Control
Accelerometer (12CE1, 12CE2,
12CE3, 12CE4)
PRESSURE SWITCH - HYDRAULIC, FLIGHT
CONTROL
REMOVAL/INSTALLATION
Removal of the Flight Control
Pressure Switch (10CE2)
Installation of the Flight Control
Pressure Switch (10CE2)
Removal of the Flight Control
Pressure Switch (10CE3)
Installation of the Flight Control
Pressure Switch (10CE3)
Removal of the Flight Control
Pressure Switch (10CE1)
Installation of the Flight Control
Pressure Switch (10CE1)
FTU (FORCE TRANSDUCER UNIT) - RUDDER
PEDAL

________
CH/SE/SU
27-92-13

C
_

PAGE ___________
____
EFFECTIVITY
401
401

ALL
ALL

406

ALL

401
401

ALL
ALL

405

ALL

409
413

ALL
ALL

401
401

ALL
ALL

404

ALL

401
401

ALL
ALL

404

ALL

401
401

ALL
ALL

405

ALL

410

ALL

413

ALL

418

ALL

422

ALL

27-92-14

27-92-15

27-92-16

27-92-17

27-92-27
27-CONTENTS

R
AIJ

Page 47
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
REMOVAL/INSTALLATION
Removal of the Rudder Pedal Force
Transducer (74CE)
Installation of the Rudder Pedal
Force Transducer (74CE)
SIDE STICK ASSEMBLY
REMOVAL/INSTALLATION
Removal of the Side Stick Assembly
19VU (18VU)
Installation of the Side Stick
Assembly 19VU (18VU)
Removal of the Transducer Units
(4CE1, 4CE2, 4CE3, 4CE4)
Installation of the Transducer
Units (4CE1, 4CE2, 4CE3, 4CE4)
Removal of the Dampers
Installation of the Dampers
Removal of the Solenoid (12CA1,
12CA2)
Installation of the Solenoid
(12CA1, 12CA2)
Removal of the Control Handle
Installation of the Control Handle
Removal of the Radio PTT Switch
(11RN, 12RN)
Installation of the Radio PTT
Switch (11RN, 12RN)
Removal of the Pushbutton
Switch-Takeover and Priority
(8CE1, 8CE2)
Installation of the Pushbutton
Switch-Takeover and Priority
(8CE1, 8CE2)
Removal of the Side Stick Bellows
Installation of the Side Stick
Bellows
Removal of the Side Stick Spring
Rods
Installation of the Side Stick
Spring Rods
SIDE STICK ASSEMBLY
ADJUSTMENT/TEST
Operational Test of the Side Stick
Assembly

CH/SE/SU
________

ELEVATOR AILERON COMPUTER SYSTEM (ELAC)

27-93-00

C
_

____ ___________
PAGE
EFFECTIVITY
401 ALL
401 ALL
405

ALL

401
401

ALL
ALL

406

ALL

412

ALL

415

ALL

421
424
426

ALL
ALL
ALL

430

ALL

436
439
443

ALL
ALL
ALL

448

ALL

451

ALL

454

ALL

457
461

ALL
ALL

466

ALL

471

ALL

501
501

ALL
ALL

27-92-41

27-92-41

27-CONTENTS
R
AIJ

Page 48
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
DESCRIPTION AND OPERATION
General
Component Location
Power Supply
Component Description
General
Description of Boards
Operation
Monitoring of Peripherals (IMP
VAL)
Computation of Laws
Control Surface Slaving
Self-Monitoring of the Computer
Behavior upon Power Rise and
Cutoff
Behavior upon Action on the
OFF/R Pushbutton Switch

CH/SE/SU
________

ELEVATOR AILERON COMPUTER SYSTEM


(ELAC)
SERVICING
Uploading of the ELAC Software
Check of the reference of the
software loaded in the ELAC

27-93-00

ELEVATOR AILERON COMPUTER SYSTEM


(ELAC)
DEACTIVATION/REACTIVATION
Deactivation of the Elevator
Aileron Computer
Refer to the MMEL TASK:
27-93-01-A)
Reactivation of the Elevator
Aileron Computer
Refer to the MMEL TASK:
27-93-01-A)
Deactivation of the Stabilizer
Actuator Electrical Motor n2
Refer to the MMEL TASK: 27-44-01
Reactivation of the Stabilizer
Actuator Electrical Motor n2
Refer to the MMEL TASK: 27-44-01

27-93-00

C
_

____ ___________
PAGE
EFFECTIVITY
1 ALL
1 ALL
1 ALL
3 ALL
3 ALL
3 ALL
13 ALL
31 ALL
31 ALL
51
51
59
60

ALL
ALL
ALL
ALL

60

ALL

301
301
308

009-012, 015-100
009-012, 015-100
009-012, 015-100

401
401

ALL
ALL

401

ALL

409

ALL

409

ALL

411

ALL

411
419

ALL
ALL

419

ALL

27-CONTENTS
R
AIJ

Page 49
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
ELEVATOR AILERON COMPUTER SYSTEM
(ELAC)
ADJUSTMENT/TEST
Operational Test of the Elevator
and Aileron Computers (ELACs)
Operational Test of the ELAC 2
STBY PWR SPLY Availability in case
of loss of Blue Hydraulic Pressure
(To be done before revenue flight
landing gear down)
COMPUTER - ELEVATOR AILERON (ELAC)
REMOVAL/INSTALLATION
Removal of the ELAC (2CE1, 2CE2)
Installation of the ELAC (2CE1,
2CE2)

________
CH/SE/SU
27-93-00

SPOILER AND ELEVATOR COMPUTER (SEC)


DESCRIPTION AND OPERATION
General
Component Location
Power Supply
Interface
Analog Interface
Discrete Interface
ARINC Interface
Component Description
General
Description of the Boards
Operation
General
Functions

27-94-00

C
_

PAGE ___________
____
EFFECTIVITY
501
501

ALL
ALL

507

ALL

401
401
404

ALL
ALL
ALL

1
1
1
1
7
7
14
14
28
28
31
32
32
35

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

401
401

ALL
ALL

401

ALL

407

ALL

407

ALL

27-93-34

SPOILER AND ELEVATOR COMPUTER (SEC)


DEACTIVATION/REACTIVATION
Deactivation of the Spoiler
Elevator Computer (SEC)
Refer to the MMEL TASK:
27-94-0X-A)
Reactivation of the Spoiler
Elevator Computer (SEC)
Refer to the MMEL TASK:
27-94-0X-A)

27-94-00

SPOILER AND ELEVATOR COMPUTER (SEC)

27-94-00
27-CONTENTS

R
AIJ

Page 50
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
ADJUSTMENT/TEST
Operational Test of the Spoiler
Elevator Computer 1 (SEC 1)
Operational Test of the Spoiler
Elevator Computer 2 (SEC 2)
Operational Test of the Spoiler
Elevator Computer 3 (SEC 3)
COMPUTER - SPOILER ELEVATOR (SEC)
REMOVAL/INSTALLATION
Removal of the SEC (1CE1, 1CE2,
1CE3)
Installation of the SEC (1CE1,
1CE2, 1CE3)

CH/SE/SU
________

FLIGHT CONTROL DATA CONCENTRATOR (FCDC)


DESCRIPTION AND OPERATION
General
Component Location
Power Supply
Electrical Power
Interface
Component Description
General
Processor Board
Program Memory Module
I/O Interfaces
Input/Output Protections
Operation
Data Concentration
Maintenance Functions
Particular Points
Test
General
Self Test
System Test
In-Flight Monitoring
Maintenance Mode
Digital Output Interface
Digital Outputs: FCDCs Bus 1&2.
Discrete Outputs
CONCENTRATOR - FLIGHT CONTROL DATA
(FCDC)
REMOVAL/INSTALLATION
Removal of the FCDC (3CE1, 3CE2)
Installation of the FCDC (3CE1,
3CE2)

27-95-00

C
_

____ ___________
PAGE
EFFECTIVITY
501 ALL
501 ALL
509

ALL

517

ALL

401
401

ALL
ALL

405

ALL

1
1
1
3
3
7
7
7
12
15
15
25
25
25
25
25
26
26
27
29
29
29
29
30
41

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

401
401
404

ALL
ALL
ALL

27-94-34

27-95-34

27-CONTENTS
R
AIJ

Page 51
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
SUBJECT
_______

CH/SE/SU
________

MAINTENANCE AND SAFETY TESTS/BITE


DESCRIPTION AND OPERATION
General
Maintenance
Periodic Tests
Automatic Tests
Interface
Operation
Maintenance - General
Maintenance - CFDS Menu
Maintenance - F/CTL Menu
Test
Elevator servocontrol damping
test
Aileron servocontrol damping
test
Conditions Required to
Initialize the Tests
Automatic Tests

27-96-00

MAINTENANCE AND SAFETY TESTS/BITE


ADJUSTMENT/TEST
Operational Test of the FCDC
Operational Test of the Computers
Engagement/Disengagement
Operational Test of the Side Stick
Priority
Operational Test of the THS
Actuator with Electrical Motor N3
Operational Test of the Damping
Measurement (Aileron)
Operational Test of the Damping
Measurement (Elevator)
Operational Test after
Removal/Installation of the
Pressure Switches (10CE1, 10CE2,
10CE3)
Operational Test of Logics
Activating ELAC 1&2, & SEC 1 STBY
PWR SPLY & Ability of SEC 1&2 to
Achieve Pitch CTL & Ability of
Sidestick Priority Function
Operational Test of the Side Stick
Assembly (Activation for the BITE

C
_

PAGE ___________
____
EFFECTIVITY
1
1
1
1
1
1
1
1
3
3
16
16

ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

16

ALL

20

ALL

22

ALL

501
501
504

ALL
ALL
ALL

507

ALL

516

ALL

520

ALL

526

ALL

532

ALL

536

ALL

569

ALL

27-96-00

27-CONTENTS
R
AIJ

Page 52
Aug 01/11

CHAPTER 27
__________
FLIGHT CONTROLS
TABLE OF CONTENTS
_________________
_______
SUBJECT
Test)
Operational Test of the THS
Actuator Electrical Control
(Activation for BITE Test)
Integrity Test of the Flight
Control System
BITE Test of the EFCS (Ground
Scanning)
Operational Test of the Ground
Spoiler Extension

CH/SE/SU
________

C
_

PAGE ___________
____
EFFECTIVITY
574

ALL

580

ALL

598

ALL

A502

ALL

27-CONTENTS
R
AIJ

Page 53
Aug 01/11

FLIGHT CONTROLS - GENERAL - DESCRIPTION AND OPERATION


_____________________________________________________
1. ______________________________________
Description of Primary Flight Controls
A. Glossary
----------------------------------------------------------------------------|
GLOSSARY
|
|---------------------------------------------------------------------------|
| ABBREVIATION |
SIGNIFICATION
|
|---------------------------------------------------------------------------|
| ADC
| Air Data Computer
|
| ADIRS
| Air Data/Inertial Reference System
|
| CFDIU
| Centralized Fault Display Interface Unit
|
| DMU
| Data Management Unit
|
| ECAM
| Electronic Centralized Aircraft Monitoring
|
| EFCC
| Electronic Flight Control Computer
|
| EFCS
| Electrical Flight Control System
|
| ELAC
| Elevator Aileron Computer
|
| FAC
| Flight Agmentation Computer
|
| FCDC
| Flight Control Data Concentrator
|
| FMGC
| Flight Management and Guidance Computer
|
| IRS
| Inertial Reference System
|
| LVDT
| Linear Variable Differential Transducer
|
| RVDT
| Rotary Variable Differential Transducer
|
| SEC
| Spoiler Elevator Computer
|
| SFCC
| Slat Flap Control Computer
|
---------------------------------------------------------------------------B. General Principles
The control is achieved through conventional surfaces.
(Ref. Fig. 001)
The roll and pitch controls of the aircraft are electrical. They are
based on two different types of digital computers (ELAC and SEC), each of
them being able to control the aircraft in both axes. Monitoring and
redundancy within the flight control system, aircraft sensors, power and
hydraulic generation ensure a high degree of availability of the
electrical control. The basic yaw control is hydromechanical as well as
the alternate horizontal stabilizer control, thus providing the ability
to keep the aircraft in flight during a temporary complete loss of
electrical power. However, in normal conditions, some rudder control
functions (trim, travel limitation) are achieved by the FAC.
The normal pitch control law is basically the closed loop control of the
load factor, and includes flight envelope protections. The normal lateral
control law combines the roll rate control, turn coordination and Dutch
roll damping functions.



EFF :
ALL
 27-00-00



AIJ




Page 1
Feb 01/07

Flight Control Surfaces (A320)


Figure 001


EFF :
ALL
 27-00-00



AIJ




Page 2
Feb 01/07

C. Ailerons
The roll control of the aircraft is achieved by one wing tip aileron
augmented by four spoilers on each wing. The ailerons are manually
controlled from the side stick controllers or automatically in autopilot
function.
Each aileron can be powered by two servocontrols signalled by two
Elevator and Aileron Computers (ELAC) and supplied from different
hydraulic systems. In normal operation, the roll function of the ailerons
is achieved through the ELAC 1 and the associated servocontrols in active
mode, the ELAC 2 being in standby and its associated servocontrols in
damping mode. In the event of a failure, the ailerons become
automatically controlled by the ELAC 2 (roll) and the associated
servocontrols switched to the active mode, the others being now damped.
If a multiple failure condition causes the loss of the control of the two
servocontrols of an aileron, the servocontrols automatically switch to
the damping mode. This operating mode is also automatically engaged in
the event of loss of pressure.
Two independent side stick controllers are installed in the cockpit. They
include the roll and pitch position transducers and feel mechanisms, and
a solenoid-operated detent that locks the control lever in neutral
position when the autopilot is engaged.
D. Rudder
The rudder mainly permits to achieve the yaw control.
The rudder is actuated by three servo controls.
The servo controls can be driven:
- in manual mode:
either mechanically from the pedals ,
or electrically from the side stick and/or the rudder pedals
- in autopilot control mode:
from the FMGECs.
The rudder is powered by three servo controls mechanically signalled from
the pedals through a single load path linkage fitted with a centering
spring device that holds the servocontrol input in the neutral position
if a disconnection occurs.
Each set of pedals is fitted with a position transducer.
Feel is provided by a spring rod, the zero force position of which is
controlled by an electrical trim actuator.
A solenoid-operated mechanism increases the feel force threshold when the
autopilot is engaged.
Two yaw-damper electrohydraulic servoactuators connected to a common
output lever drive the linkage through a differential lever arrangement.
One servoactuator is normally operating, the other being by-passed. A
spring rod is provided to center the actuators when both of them are
depressurized.
The maximum control stroke is restricted by the Travel Limitation Unit as
a function of the airspeed.



EFF :
ALL
 27-00-00



AIJ




Page 3
Feb 01/07

The trim actuator, the yaw damper servoactuators and the travel
limitation unit are normally controlled by the Flight Augmentation
Computer (FAC) 1, the FAC 2 being in standby.
In addition to their basic function, the trim actuator and the yaw damper
servoactuators are used to introduce the autopilot signals.
Rudder immobilization or runaway in the event of a servocontrol valve
jamming is prevented by a spring rod and pressure relief valve
arrangement.
E. Elevators (Ref. 27-30 and 27-90)
The pitch control of the aircraft is achieved by two mechanically
independent elevators controlled manually from the side stick controllers
or automatically in autopilot function.
Each elevator can be driven by two electrohydraulic servocontrols
signalled by the ELACs or SEC 1 or 2, and supplied from different
hydraulic systems.
In normal operation the elevators are controlled by the ELAC 2 and the
associated servocontrols in active mode, the other computers being in
standby and the servocontrols in damping mode. In the event of a high
load-factor demand that would cause one servocontrol to stall, the second
servocontrol is operated. In the event of failure, the elevators are
controled by ELAC1, then by SEC2 or SEC1. In the event of the loss of
control of the two servocontrols of the elevator, the servocontrols are
automatically switched to a centering mode and hold the surface in the
neutral position (Electrical control loss). In the event of the loss of
the two hydraulic systems supplying the servocontrols of one elevator,
the damping mode becomes automatically engaged.
The side stick controller operation for the pitch control is similar to
the roll control as described in para. 1.B.
F. Trimmable Horizontal Stabilizer (Ref. 27-40 and 27-90)
The pitch trim function is achieved by the Trimmable Horizontal
Stabilizer (THS) either automatically in normal in-flight manual mode or
autopilot function or manually from the handwheels in normal ground
operation or in-flight failure condition.
The THS is moved and held by a THS actuator that includes a double
load-path ball screw powered by two differentially coupled hydraulic
motors mechanically servocontrolled. The ball screw is fitted with a
no-back brake, the motors are fitted with pressure-off brakes. The
control loops include a device that applies both pressure-off brakes in
the event of either control valve jamming.
The input shaft of the THS actuator is normally driven by an electrical
motor servocontrolled by the ELAC 2, two other motors controlled
respectively by ELAC 1 or SEC 1 and SEC 2.
The input shaft of the THS actuator can also be manually driven by the
pilots through a mechanical linkage normally moved by the handwheels.



EFF :
ALL
 27-00-00



AIJ




Page 4
Feb 01/07

An overriding mechanism gives the priority to the mechanical control over


the electrical control.
G. Spoilers
Five spoiler surfaces are provided on each wing to achieve the functions
below :
- roll spoiler (surfaces 2 to 5)
- speedbrake (surfaces 2 to 4)
- ground spoilers (all surfaces).
These surfaces are manually controlled from the side stick controllers
(roll spoilers), speedbrake control lever (speedbrake) or automatically
in autopilot and ground spoiler function.
Each surface is controlled by one servocontrol supplied from the Green,
Yellow or Blue system and signalled from the SEC 1, 2 or 3.
The combination of the different functions is achieved in the computers.
In the event of an electrical failure, the associated surface is
hydraulically held down. In the event of a hydraulic failure, the
servocontrol is hydraulically locked in one direction to prevent the
surface from raising. In both cases the control of the symmetrical
surface is automatically inhibited.
H. Electrical Flight Control System
(1) General
(Ref. Fig. 002)
The Electrical Flight Control System includes the ELACs, the SECs,
the Flight Control Data Concentrators (FCDCs) and vertical
accelerometers.
The EFCS is built according to the principles below :
(a) Redundancy and dissimilarity
The EFCS includes two ELACs, three SECs, two FCDCs and four
accelerometers. The ELACs and SECs are both able to achieve the
roll and pitch control of the aircraft. These two types of
computer differ by their internal architecture, hardware, type of
microprocessor, software. For each computer type, the control and
monitoring software are different.



EFF :
ALL
 27-00-00



AIJ




Page 5
Feb 01/07

Electrical Flight Control System Architecture


Figure 002


EFF :
ALL
 27-00-00



AIJ




Page 6
Feb 01/07

(b) Monitoring
The monitoring of each computer (ELAC, SEC) is achieved as
follows:
- Monitoring channel: Each computer consists of two physically
and electrically-separated channels, one being dedicated to the
control functions, the other to the monitoring of these. These
two channels perform the actuator command signal computation
using different digital processes. The monitoring channel
permanently compares the results of these computations and
inhibits the signal to the actuator, should a discrepancy
occur.
- Self-monitoring capacity : Each channel is able to detect the
failure of the critical signals it receives or emits and to
detect internal failures by test of the processor and
monitoring of its internal power supply.
- Cross-talk : Each control and associated monitoring channel
permanently exchanges information via digital buses, therefore
consolidating and validating information received from
different sensors.
- Automatic power-on and pressure-on safety tests performed
without movement of the surfaces.
(c) Installation
The installation takes into account the principles below :
- Wiring installation : specific connectors are used for the
EFCS.
Electrical routes 1 are used for items powered from the
emergency electrical supply, routes 2 are used for items
powered from the normal electrical supply.
Control signals are routed in routes S, monitoring signals are
routed in routes M. In the sections exposed to the engine burst
the EFCS cables are shared between the normal and deviated
routes.
- Protection against lightning strikes : in the exposed areas the
wires are installed in metal shields - for each signal the
wires are twisted. The grounding of signals is not achieved in
the exposed areas. Aileron-related wires are routed in the
leading edge whereas spoiler-related wires are in the trailing
edge. The inputs of the computers include low-pass filters and
overvoltage protections if the associated wires are routed in
exposed areas.
(2) Control laws
The different control laws and associated protections, as listed
below may be used, depending on the integrity of the flight control
and flight augmentation systems and their peripherals. They are
implemented in the computer.



EFF :
ALL
 27-00-00



AIJ




Page 7
Feb 01/07

(Ref. Fig. 003)


(3) Roll and yaw controls :
(a) Roll normal law
This is the combined control of the ailerons, spoiler surfaces 2
to 5 and rudder from the side stick controllers coupled according
to the priority logic. In flight, it achieves the control and the
limitation of the roll rate, providing a neutral spiral stability
up to 33 degrees of bank angle, the turn coordination and the
dutch roll damping. It requires gains depending on the
ground/flight condition, airspeed and configuration. On the
ground it provides a fixed relationship between the side stick
controller angle and the aileron and spoiler deflections. The
rudder can also be directly controlled either mechanically from
the pedals or from the trim switches. The rudder deflection is
limited as a function of the airspeed.
(b) Roll direct law
This is the control of the aileron and spoiler surfaces 2 to 5
from the side stick controllers coupled according to the priority
logic.
It achieves the control of the above surface angles using gains
depending on the configuration.
(c) Alternate yaw control
This is the direct control of the rudder from the pedals or the
trim switches complemented by a limited-authority dutch-roll
damping function using gains depending on the configuration. The
rudder deflection is limited as a function of the airspeed.
(4) Pitch control
(a) Pitch normal law
This is the combined control of the elevators and THS from the
side stick controllers coupled according to the priority logic to
achieve the load factor control. It requires load factor and
pitch attitude rate feedbacks, variable gains depending on
ground/flight condition, radio altimeters, airspeed and
configuration. It includes a high angle-of-attack protection and
a load factor limitation that cannot be overriden by the crew,
and an overspeed protection.
On the ground, it provides a fixed relationship between the side
stick controller angle and the elevator deflections.



EFF :
ALL
 27-00-00



AIJ




Page 8
Feb 01/07

Control Law Implementation


Figure 003



EFF :
ALL
 27-00-00



AIJ




Page 9
May 01/09

(b) Pitch alternate law


This is the control of the elevators and the THS, if operative,
from the side stick controllers coupled according to the priority
logic to achieve the load factor control.
It uses limited authority load factor and pitch rate feedbacks
and gains depending on the configuration. It includes a load
factor limitation that cannot be overriden by the crew and
alternate protections.
(c) Pitch direct law
This is the control of the elevator angle from the side stick
controllers coupled according to the priority logic with a gain
depending on the configuration. Pitch trim can be achieved via
the mechanical control of the THS.
(5) Speedbrake control
This is the control of the position of the spoiler surfaces 2 to 4
from the speedbrake control lever.
(6) Ground spoiler control
This is the automatic full deployment of all the spoiler surfaces at
touch down.
(7) Description of Flap and Slat Control
(a) Flap Control
Achieved on each wing by one inboard flap and one outboard flap.
(Ref. Fig. 004)
(b) Slat Control Lift Augmenting
Achieved on each wing by five slats.
(Ref. Fig. 004)
2. ____________________________
Flight Controls Power Supply
A. Electrical Power Supply
(Ref. Fig. 005)
The ELAC 1 and SEC 1 are each supplied from a DC essential busbar (4PP
for the ELAC 1 and SEC 1), the battery 1 taking over instantaneously
through a dedicated diode device (Power Supply Uncoupling Unit) when the
voltage level drops below the battery output voltage. A relay ensures the
battery supply line breaking on the ground 30s after the second engine
shut down.
The ELAC 2, and the THS motor 1 are normally supplied from the DC normal
busbar 2PP.



EFF :
ALL
 27-00-00



AIJ




Page 10
Feb 01/07

Slats and Flaps Architecture


Figure 004


EFF :
ALL
 27-00-00



AIJ




Page 11
Feb 01/07

Flight Control Electrical Power Supply


Figure 005


EFF :
ALL
 27-00-00



AIJ




Page 12
Feb 01/07

In case of loss of this busbar (particularly after the loss of both main
generation channels, or after a double main TRU failure), these supplies
are automatically switched over to the battery 2 by means of two relays,
for a fixed period of 30s.
The SEC 2, the SEC 3, the THS electrical motor 3 , and FCDC 2 are
supplied from the DC normal busbar 2PP.
The THS electrical motor 2 is supplied from the DC essential busbar 4PP.
The FCDC 1 is supplied from the DC essential busbar 8PP.
B. Hydraulic Power Supply
(Ref. Fig. 006)
The flight controls are powered by the three independent hydraulic
systems ; redundancy is such that with two hydraulic systems failed, the
remaining system can operate the aircraft within an acceptable range of
the flight envelope.
Hydraulic characteristics of flight control components are given in the
component description paragraphs.
(1) Priority Valves
Priority valves are installed upstream of the components below :
- Blue system : slat power control unit (PCU) motor
- Green system : flap and slat PCU motors
- Yellow system : flap PCU motor
in order to avoid supply pressure of the main flight control
components dropping below approximately 130 bars (1885 psi) when
various hydraulic user systems are operated simultaneously.
(2) Leakage Measurement Valves
Ground maintenance isolation valve blocks are installed in the flight
controls hydraulic supply lines to allow measurement of internal
leakage of the components installed downstream of these valves and
valve jamming detection tests.
(3) Safety Valve
To preserve the Green system in case of engine burst, a safety valve
is installed.
3. Cockpit
_____________________________________
Flight Control And Indicating
These figures represent all the controls and indicators for the flight
controls located in the cockpit.
(Ref. Fig. 007)



EFF :
ALL
 27-00-00



AIJ




Page 13
Feb 01/07

R
R

Flight Control Hydraulic Power Supply


Figure 006



EFF :
ALL
 27-00-00



AIJ




Page 14
Aug 01/11

Cockpit Control and Indicating


Figure 007

EFF :
ALL
 27-00-00




AIJ




Page 15/16
Feb 01/07

FLIGHT CONTROLS - GENERAL - MAINTENANCE PRACTICES


_________________________________________________
R

TASK 27-00-00-480-001
Installation of the Pitch-Trim Control Locking Tool (98D27403500000)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27403500000

1 PITCH TRIM CONTROL LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-00-00-991-001

Fig. 201

3. __________
Job Set-up
Subtask 27-00-00-869-053
A. On the center pedestal, make sure that the trim control wheels are in the
0 position.
4. Procedure
_________
R

(Ref. Fig. 201/TASK 27-00-00-991-001)


Subtask 27-00-00-480-050
A. Installation of the Pitch-Trim Control Locking Tool
(1) Lift the cover (1).
(2) Fully loosen the two nuts (3).



EFF :
ALL
 27-00-00



AIJ




Page 201
Feb 01/07

R
R

Locking Tool - Pitch-Trim Control


Figure 201/TASK 27-00-00-991-001



EFF :
ALL
 27-00-00



AIJ




Page 202
Feb 01/07

(3) Install the PITCH TRIM CONTROL LOCKING (98D27403500000) (7) on the
center pedestal.
NOTE : The wheel (5) must be between the grooves of the two side
____
plates (4).
(4) Tighten the two nuts (3) until the two side plates (4) lock the wheel
(5).
(5) With the two screws (2), put the two stops (6) against the center
pedestal so that the assembly cannot move.
(6) Lower the cover (1).



EFF :
ALL
 27-00-00



AIJ




Page 203
Feb 01/07

TASK 27-00-00-080-001
Removal of the Pitch-Trim Control Locking Tool (98D27403500000)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-00-00-991-001

Fig. 201

3. __________
Job Set-up
R

(Ref. Fig. 201/TASK 27-00-00-991-001)


Subtask 27-00-00-860-050
A. Not applicable
4. Procedure
_________
Subtask 27-00-00-080-050
A. Removal of the Pitch-Trim Control Locking Tool
(1) Lift the cover (1).
(2) Loosen the two screws (2).
(3) Fully loosen the two nuts (3).
(4) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) (7).



EFF :
ALL
 27-00-00



AIJ




Page 204
Feb 01/07

TASK 27-00-00-480-002
Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27803000000

1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-00-00-991-002

Fig. 202

3. __________
Job Set-up
R

(Ref. Fig. 202/TASK 27-00-00-991-002)


Subtask 27-00-00-860-052
A. Not applicable
4. Procedure
_________
Subtask 27-00-00-480-051
A. Installation of the Flap/Slat Control-Lever Locking Tool
(1) Install the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000)
(2) on the flap/slat control lever (1).
(2) Lock the locking tool with the pin (3).
(Ref. Fig. 202/TASK 27-00-00-991-002)



EFF :
ALL
 27-00-00



AIJ




Page 205
Feb 01/07

R
R

Flap/Slat Control-Lever Locking Tool


Figure 202/TASK 27-00-00-991-002



EFF :
ALL
 27-00-00



AIJ




Page 206
Feb 01/07

TASK 27-00-00-080-002
Removal of the Flap/Slat Control-Lever Locking Tool (98D27803000000)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27803000000

1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-00-00-991-002

Fig. 202

3. __________
Job Set-up
Subtask 27-00-00-860-051
A. Not applicable
4. Procedure
_________
Subtask 27-00-00-080-051
A. Removal of the Flap/Slat Control-Lever Locking Tool
(Ref. Fig. 202/TASK 27-00-00-991-002)

(1) Remove the pin (3) from the LOCKING TOOL - FLAP/SLAT CONTROL LEVER
(98D27803000000) (2).
(2) Remove the locking tool (2) from the flap/slat control lever (1).



EFF :
ALL
 27-00-00



AIJ




Page 207
Feb 01/07

AILERON - DESCRIPTION AND OPERATION


___________________________________
1. _______
General
(Ref. Fig. 001)
One aileron (operational at all speeds) and four spoilers ensure roll
control on each wing.
The Elevator and Aileron Computers (ELAC Ref. 27-93) electrically control
the ailerons.
The Spoilers and Elevator Computers (SEC Ref. 27-94) electrically control
the spoilers.
The two side stick controllers deliver electrical signals which are used for
the computation of the control orders.
The operation of the artificial feel system (Ref. 27-92) is independent of
the flight conditions. There is no roll trim control.
Two electrohydraulic servocontrols (Ref. 27-14) hydraulically actuate each
aileron.
One electrohydraulic servocontrol (Ref. 27-64) hydraulically actuates each
spoiler.
The position of the surfaces is indicated on the lower ECAM display unit
through the Flight Control Data Concentrator (FCDC) (Ref. 27-95).
On ground, with hydraulic systems not pressurized, the ailerons may or may
not droop down to the servocontrol stop depending on the scatter of bearing
and seal friction.
2. __________________
System Description
A. Interface with the Autopilot System (Ref. 22-60)
In AP mode, the FMGC orders are received by the ELACs which transfer to
the SECs the order which correspond to roll spoiler control.
The position of the side stick control is not slaved to the AP control
orders.
The pilots can cancel the automatic mode, through the override of a
disengaging system (which includes a spring device and a solenoid)
installed in each side stick unit.



EFF :
ALL
 27-10-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-10-00



AIJ




Page 2
Feb 01/07

Aileron Block Diagram


Figure 001

EFF :
ALL
 27-10-00




AIJ




Page 3/4
Feb 01/07

AILERON AND HYDRAULIC ACTUATION - DESCRIPTION AND OPERATION


___________________________________________________________
1. _______
General
The hydraulic actuation is achieved by two electrohydraulic servocontrols
for each aileron.
2. Component
__________________
Location
(Ref. Fig. 001)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------33CE1
SERVO CTL-L AILERON, INBD G
575 575AT
27-14-51
33CE2
SERVO CTL-R AILERON, INBD G
675 675AT
27-14-51
33CE3
SERVO CTL-L AILERON, OUTBD B
575 575KB
27-14-51
33CE4
SERVO CTL-R AILERON, OUTBD B
675 675KB
27-14-51
3. ______________________________
Hydraulic Supply (Ref. ATA 29)
4. _____________________
Component Description
A. Aileron Servocontrol
(1) General
The four fixed-body servocontrols (two per aileron) are
interchangeable.
5. _________
Operation
(Ref. Fig. 002)
A. Normal operation with the servocontrol pressurized
The pressurization of the servocontrol involves the opening of the
pressure-line closing valve (2) and of the return-line closing valve (3).
Thus, the servovalve (4) is supplied from the HP system and the return
system of the servocontrol is connected to the LP system.
(1) Servocontrol in the active mode.
In this case, the solenoid valve (1) is energized and lets in the HP
flow which puts the mode selector valve (5) in the active mode.
The two chambers of the actuator are thus connected to the servovalve
control lines. The servocontrol is then in the active mode. The
Linear Variable-Differential Transducer (LVDT) (11) supplies an
electrical signal which identifies this change of state.
The feedback transducer (LVDT) (10) gives the servoloop feedback.



EFF :
ALL
 27-14-00



AIJ




Page 1
Feb 01/07

Location of Aileron Servocontrols


Figure 001


EFF :
ALL
 27-14-00



AIJ




Page 2
Feb 01/07

Aileron Servocontrol
Figure 002


EFF :
ALL
 27-14-00



AIJ




Page 3
Feb 01/07

(2) Servocontrol in the damping mode.


In this configuration, the solenoid valve is de-energized and the
mode selector-valve moves under the action of its spring. This causes
the two chambers of the actuator to be interconnected through the
damping orifice (6).
The linear variable-differential transformer identifies this change
of state.
The check valve (7) and the fluid reserve (9) hold the volume of
fluid in the actuator chambers :
- if the temperature of the hydraulic fluid changes
- if there is a leakage.
The reserve of fluid is permanently connected to the return line of
the servovalve. The return relief valve (8) increases the pressure in
the return line and permits to fill the reserve of fluid.
B. Operation after an electrical failure
In this case the solenoid valve is de-energized and the operation is
identical to the one of paragraph A. (2).
C. Operation after a hydraulic failure
The closing valves (2) and (3) close and isolate the servocontrol from
the hydraulic system of the aircraft.
If there is a rupture of the aircraft return line, the return relief
valve holds the volume of fluid in the fluid reserve.
The mode selector valve moves under the action of its spring. Then the
servocontrol operates in the damping mode.
D. Special Case
After hydraulic
between the two
This is because
servo control.
This difference

depressurization, a difference in droop speed and travel


ailerons is possible.
of the variations of friction in the attachments and the
is correct.

E. Maintenance and rigging facilities


The maintenance is on condition.
The items given below are Line Replaceable Units :
- filter
- servovalve
- solenoid valve
- linear variable-differential transducer.
After replacement of the servocontrol, it is necessary to adjust the
feedback transducer (10) . It is necessary to get an equal voltage in the
secondary windings (electrical zero) when the aileron is in the neutral
position. This is done through an action on the feedback transducer
adjustment device located on the actuator.



EFF :
ALL
 27-14-00



AIJ




Page 4
Feb 01/07

AILERON AND HYDRAULIC ACTUATION - DEACTIVATION/REACTIVATION


___________________________________________________________
TASK 27-14-00-040-001
Deactivation of the Aileron Servo Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : DO NOT DO THIS DEACTIVATION PROCEDURE IF THERE IS EXTERNAL LEAKAGE ON
_______
THE UNSERVICEABLE SERVOCONTROL.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-14-0X-A)
Aileron Servo-Control
(Old MMEL ref: 27-14-01-A))

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

blanking caps
circuit breaker(s) safety clip(s)
tie-wrap
warning notice
1 ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE



EFF :
ALL
 27-14-00



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-14-00-710-001
27-96-00-740-001
29-10-00-864-001
29-10-00-864-003
27-14-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Aileron and Hydraulic
Actuation
BITE Test of the EFCS (Ground Scanning)
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Fig. 401

3. __________
Job Set-up
Subtask 27-14-00-860-057
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Do a ground scanning (Ref. TASK 27-96-00-740-001).
NOTE : If there is only the maintenance messages on:
____
- PEDALS XDCR UNIT 25CE1 (25CE2) and/or
- ELAC 1(2) AIL ORDER DISAGREE.
the deactivation of the aileron servocontrol is not necessary.
You can dispatch the aircraft without further maintenance
action.
(3) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001) (Ref. TASK 29-10-00-864-003).
Subtask 27-14-00-010-052
B. Get Access
R

(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position:


(a) at the zone 575 for the left aileron,
(b) at the zone 675 for the right aileron.



EFF :
ALL
 27-14-00



AIJ




Page 402
Feb 01/11

(2) Open the access door:


(a) 575KB for the left aileron,
(b) 675KB for the right aileron.
R

(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(4) Open the access door 822.
(5) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
Subtask 27-14-00-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-00-991-002)
Subtask 27-14-00-040-050
A. Deactivation of the Aileron Servo Control
(1) Make sure that there are no external leaks from the servo control you
deactivate.
(2) Make sure that the pressure and return lines are correctly connected
to the parts of the servo control.
(3) Disconnect the electrical connector (1) from the receptacle (2).
(4) Put blanking caps on the disconnected connector (1) and receptacle
(2).
(5) Attach the connector (1) to a pipe with a tie-wrap.



EFF :
ALL
 27-14-00



AIJ




Page 403
Feb 01/11

R
R

Deactivation/Reactivation of the Aileron Servocontrol


Figure 401/TASK 27-14-00-991-002



EFF :
ALL
 27-14-00



AIJ




Page 404
Feb 01/07

Subtask 27-14-00-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2
Subtask 27-14-00-710-053
C. Do the operational test of the ailerons (Ref. TASK 27-14-00-710-001).
R
R
R
R
R
R

NOTE : Make sure that:


____
- The servocontrol you deactivated does not operate.
- The related servocontrol symbol (box) is amber.
- The amber F/CTL AILERON ACTUATOR FAULT message is shown on the
EWD.
5. Close-up
________
Subtask 27-14-00-860-058
A. Put the aircraft back to its initial configuration.
(1) Put a warning notice in the cockpit to tell the crew that the left or
right aileron servo control is deactivated.
(2) Make an entry in the log-book.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-14-00-410-052
B. Close Access
(1) Close the access door:
(a) 575KB for the left aileron.
(b) 675KB for the right aileron.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822.
(5) Remove the access platform(s).



EFF :
ALL
 27-14-00



AIJ




Page 405
Aug 01/11

TASK 27-14-00-440-001
Reactivation of the Aileron Servo Control
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-14-0X-A)
Aileron Servo-Control
(Old MMEL ref: 27-14-01-A))

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


warning notice
1 ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-14-00-710-001
29-10-00-864-001
29-10-00-864-003
TSM 27
27-14-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Aileron and Hydraulic
Actuation
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
(for corrective action)
Fig. 401



EFF :
ALL
 27-14-00



AIJ




Page 406
May 01/11

3. __________
Job Set-up
Subtask 27-14-00-860-059
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) Put a warning notice in the cockpit to tell persons not to operate
the flight controls.
Subtask 27-14-00-010-053
B. Get Access
R

(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position:


(a) at the zone 575 for the left aileron,
(b) at the zone 675 for the right aileron.
(2) Open the access door:
(a) 575KB for the left aileron,
(b) 675KB for the right aileron.

(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(4) Open the access door 822.
(5) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.



EFF :
ALL
 27-14-00



AIJ




Page 407
Feb 01/11

Subtask 27-14-00-865-059
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-14-00-991-002)


Subtask 27-14-00-440-050
A. Reactivation of the Aileron Servo-Control
(1) Remove the tie-wraps.
(2) Remove the blanking caps from the electrical connector (1) and the
receptacle (2).
(3) Connect the connector (1) to the receptacle (2).
Subtask 27-14-00-865-060
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2
Subtask 27-14-00-710-054
C. Do the operational test of the ailerons (Ref. TASK 27-14-00-710-001).
Subtask 27-14-00-810-050
D. Do the trouble shooting for the servocontrol you deactivated:
- If there is a message, do the trouble shooting procedure related to the
maintenance message (Ref. TSM 27).



EFF :
ALL
 27-14-00



AIJ




Page 408
Feb 01/07

5. Close-up
________
Subtask 27-14-00-860-060
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-14-00-410-053
B. Close Access
(1) Close the access door:
(a) 575KB for the left aileron,
(b) 675KB for the right aileron.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822.
(5) Remove the access platform(s).



EFF :
ALL
 27-14-00


R 
AIJ




Page 409
Feb 01/07

AILERON AND HYDRAULIC ACTUATION - ADJUSTMENT/TEST


_________________________________________________
R

TASK 27-14-00-710-001
Operational Test of the Aileron and Hydraulic Actuation
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-14-00-861-051
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002)



EFF :
ALL
 27-14-00



AIJ




Page 501
Feb 01/07

Subtask 27-14-00-865-051
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-00-860-062
C. Aircraft Maintenance Configuration
(1) On the center pedestal, make sure that the flap and slat control
lever is in the O position.
(2) On the center pedestal, make sure that the speedbrake control lever
is in the RET position.
(3) Make sure that the two side sticks are in the neutral position and
that there is no priority on the side stick used.
(4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(5) Pressurize the Green hydraulic system (Ref. TASK 29-23-00-863-001).
(6) On the overhead panel 23VU, make sure that:
- the FLT CTL/ELAC1 pushbutton switch is pushed (on this pushbutton
switch, the FAULT anf OFF legends are off).
(7) On the overhead panel 24VU, make sure that:
- the FLT CTL/ELAC2 pushbutton switch is pushed (on this pushbutton
switch, the FAULT and OFF legends are off).
(8) On the overhead panel 50VU, make sure that:
- the HYD/LEAK MEASUREMENT VALVES/B and G pushbutton switches are
pushed (on these pushbutton switches the OFF legends are OFF).



EFF :
ALL
 27-14-00


R 
AIJ




Page 502
Feb 01/07

4. Procedure
_________
Subtask 27-14-00-710-050
A. Do this test:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal, on the
ECAM control panel:
- push the F/CTL key.

On the center instrument panel, on the


lower ECAM DU:
- the F/CTL page comes into view
- the L/AIL and R/AIL position
indicator indexes are opposite the
middle mark on the scale.

2. Move one of the two side sticks to On the L/AIL position indicator:
the left until it touches the
- the index moves to the upper mark on
stop.
the scale.
On the R/AIL position indicator:
- the index moves to the lower mark on
the scale.
3. Move the side stick to the right
until it touches the stop.

On the L/AIL position indicator:


- the index moves to the lower mark on
the scale.
On the R/AIL position indicator:
- the index moves to the upper mark on
the scale.

4. Put the side stick in the neutral


position.

On the L/AIL and R/AIL position


indicators:
- the indexes move to the middle mark
on the scale.

5. Depressurize the Green hydraulic


system (Ref. TASK 29-23-00-864001).
6. Pressurize the Blue hydraulic
system (Ref. TASK 29-10-00-863003).



EFF :
ALL
 27-14-00



AIJ




Page 503
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------7. Move one of the two side sticks to On the L/AIL position indicator:
the left until it touches the
- the index moves to the upper mark on
stop.
the scale.
On the R/AIL position indicator:
- the index moves to the lower mark on
the scale.
8. Move the side stick to the right
until it touches the stop.

On the L/AIL position indicator:


- the index moves to the lower mark on
the scale.
On the R/AIL position indicator:
- the index moves to the upper mark on
the scale.

9. Put the side stick in the neutral


position.

On the L/AIL and R/AIL position


indicators:
- the indexes move to the middle mark
on the scale.

5. Close-up
________
Subtask 27-14-00-860-061
A. Aircraft Maintenance Configuration
(1) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-14-00


R 
AIJ




Page 504
Feb 01/11

TASK 27-14-00-820-001
Adjustment of the Aileron
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific
No specific
No specific
No specific
No specific
98D27903500000
R

warning notices
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
RULER - GRADUATED
RULE
PIN-SIDE STICK LOCKING

1
1
1
1
2

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R

Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-14-00-200-001
29-10-00-863-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Aileron Servo Control Oscillations
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump



EFF :
ALL
 27-14-00



AIJ




Page 505
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-23-00-864-001
31-60-00-860-001
31-60-00-860-002
27-14-00-991-001
27-14-00-991-005

Depressurize the Green and Yellow Hydraulic Systems


after Operation of the PTU
EIS Start Procedure
EIS Stop Procedure
Fig. 501
Fig. 502

3. __________
Job Set-up
Subtask 27-14-00-861-053
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-14-00-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU PTR/SPLY
6TW
J21
121VU CFDS/CFDIU/SPLY
2TW
J18
121VU CFDS/CFDIU/BACK/UP
8TW
J17
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-00-860-064
C. Aircraft Maintenance Configuration
(1) On the panel 23VU, make sure that the FLT CTL/ELAC1 pushbutton switch
is pushed (on this pushbutton switch, the OFF and FAULT legends are
off).
(2) On the panel 24VU, make sure that the FLT CTL/ELAC2 pushbutton switch
is pushed (on this pushbutton switch, the OFF and FAULT legends are
off).
(3) Make sure that all the hydraulic systems are depressurized.



EFF :
ALL
 27-14-00


R 
AIJ




Page 506
Aug 01/11

(4) On the center pedestal, make sure that the flap and slat control
lever is in the O position.
(5) On the center pedestal, make sure that the speed brake control lever
is in the RET position.
(6) Pressurize the Green and Blue hydraulic systems (Ref. TASK 29-10-00863-001) (Ref. TASK 29-10-00-863-003).
(7) Operate the aileron ten times with the side stick to bleed the
system.
(8) On the panel 23 VU, release the FLT CTL/ELAC1 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
(9) Operate the aileron ten times with the side stick to bleed the
system.
(10) Put the side stick in the neutral position.
(11) Install the PIN-SIDE STICK LOCKING (98D27903500000) on the side
sticks.
(12) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to operate the side sticks.
(13) On the panel 23 VU, push the FLT CTL/ELAC1 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(14) Depressurize the Green hydraulic system (Ref. TASK 29-23-00-864-001)
Subtask 27-14-00-010-051
D. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door
822.
(2) Open the access door 822.
(3) Open the battery power center 105VU:
- loosen the two screws and remove the protective cover.



EFF :
ALL
 27-14-00



AIJ




Page 507
Feb 01/11

(4) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at zone:
(a) 575 for the left aileron,
(b) 675 for the right aileron.
(5) Open the access door:
(a) 575KB for the left aileron,
(b) 675KB for the right aileron.
NOTE : For an easier access for adjustment of the aileron
____
servocontrol, remove the rubbing strip seal, if necessary.
4. Procedure
_________
(Ref. Fig. 501/TASK 27-14-00-991-001, 502/TASK 27-14-00-991-005)
Subtask 27-14-00-820-052
A. Adjustment of the Aileron when the Blue Outboard Servocontrol is
Pressurized.
NOTE : If you see oscillations when the servocontrol is in the active
____
mode, do a check of these oscillations (Ref. TASK 27-14-00-200001).
NOTE : To adjust an aileron, you must adjust the surface with one
____
servocontrol active and then the other.
NOTE : At this time, the Blue servocontrol (33CE3, 33CE4) is in the
____
active mode.

R
R

(1) Put a RULE in position on the trailing edge of the wing (inboard end
of the wing) (see detail E).

R
R

(2) Use a RULER - GRADUATED to measure the position of the aileron in


relation to the RULE .
NOTE : To optimize the theoretical loft line, the ailerons position
____
must be as close as possible to the nominal values.
If the position of the aileron is not satisfactory, adjust the
Blue servocontrol as follows:
(a) Cut and remove the lockwire from the bolts (3).



EFF :
ALL
 27-14-00



AIJ




Page 508
Feb 01/11

R
R

Position of the Aileron Servocontrol


Figure 501/TASK 27-14-00-991-001



EFF :
ALL
 27-14-00



AIJ




Page 509
Feb 01/07

R
R

Aileron Adjustment
Figure 502/TASK 27-14-00-991-005



EFF :
ALL
 27-14-00



AIJ




Page 510
Feb 01/07

(b) Remove the bolts (3) and the lock plate (1).
(c) Set the control surface to zero with the adjusting nut (2).
NOTE : Always turn the adjusting nut (2) in the same direction to
____
adjust the clearances and the hysteresis.
(d) Install the lock plate (1) and the bolts (3).
R
R

(e) Safety the bolts (3) with the MISCELLANEOUS (Material No. 19010).
(3) Pressurize the Green hydraulic system (Ref. TASK 29-23-00-863-001).
(4) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
Subtask 27-14-00-820-053
B. Adjustment of the Aileron when the Green Inboard Servocontrol is
Pressurized.
NOTE : If you see oscillations when the servocontrol is in the active
____
mode, do a check of these oscillations (Ref. TASK 27-14-00-200001).
NOTE : To adjust an aileron, you must adjust the surface with one
____
servocontrol active and then the other.
NOTE : At this time, the Green servocontrol (33CE1, 33CE2) is in the
____
active mode.
(1) Use a RULER - GRADUATED to measure the position of the aileron in
relation to the RULE .
NOTE : To optimize the theoretical loft line, the ailerons position
____
must be as close as possible to the nominal values.
If the position of the aileron is not satisfactory, adjust the
Green servocontrol as follows:
(a) Cut and remove the lockwire from the bolts (3).
(b) Remove the bolts (3) and the lock plate (1).
(c) Set the control surface to zero with the adjusting nut (2).
NOTE : Always turn the adjusting nut (2) in the same direction to
____
adjust the clearances and the hysteresis.
(d) Install the lock plate (1) and the bolts (3).
(e) Safety the bolts (3) with the lockwire.



EFF :
ALL
 27-14-00



AIJ




Page 511
Aug 01/11

(2) Remove the RULE from the trailing edge of the wing.
(3) Make sure that the legends of the FLT CTL/ELAC 2 pushbutton switch
are off.
Subtask 27-14-00-860-063
C. Aircraft Maintenance Configuration
(1) Remove the rigging pins and the warning notices from the side sticks.
(2) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM D.U, the F/CTL page comes into into view).
(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(5) On the panel 23 VU, release the FLT CTL/ELAC1 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
Subtask 27-14-00-710-052
D. Do this test:
------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. In the CAPT or F/O seat:
- move the side stick until it
touches the left stop and hold
it in this position.

The left aileron moves up smoothly.


The right aileron moves down smoothly.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly to the upper stop.
- the index of the R/AIL indicator
moves smoothly to the lower stop.

2. In the CAPT or F/O seat:


- move the side stick from the
left stop until it touches the
right stop and hold it in this
position.

The left aileron moves down smoothly.


The right aileron moves up smoothly.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly from the upper stop
until it touches the lower stop.
- the index of the R/AIL indicator
moves smoothly from the lower stop
until it touches the upper stop.

3. In the CAPT or F/O seat:


- put the side stick in the

The left aileron moves smoothly to the


neutral position.



EFF :
ALL
 27-14-00


R 
AIJ




Page 512
Aug 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------neutral position.
The right aileron moves smoothly to the
neutral position.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly to the neutral mark.
- the index of the R/AIL indicator
moves smoothly to the neutral mark.
Make sure that no fault indication come
into view.
4. On the panel 23VU:
- push the FLT CTL/ELAC 1
pushbutton switch.

On the panel 23VU:


- the OFF legend of the FLT CTL/ELAC 1
pusbutton switch goes off.

5. On the panel 24VU:


- release the FLT CTL/ELAC 2
pushbutton switch.

On the panel 24VU:


- the OFF legend of the FLT CTL/ELAC 2
pushbutton switch comes on.

6. In the CAPT or F/O seat:


- move the side stick until it
touches the left stop and hold
it in this position.

The left aileron moves up smoothly.


The right aileron moves down smoothly.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly to the upper stop.
- the index of the R/AIL indicator
moves smoothly to the lower stop.

7. In the CAPT or F/O seat:


- move the side stick from the
left stop until it touches the
right stop and hold it in this
position.

The left aileron moves down smoothly.


The right aileron moves up smoothly.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly from the upper stop
until it touches the lower stop.
- the index of the R/AIL indicator
moves smoothly from the lower stop
until it touches the upper stop.

8. In the CAPT or F/O seat:


- put the side stick in the
neutral position.

The left aileron moves smoothly to the


neutral position.
The right aileron moves smoothly to the
neutral position.
On the F/CTL page of the lower ECAM DU:
- the index of the L/AIL indicator
moves smoothly to the neutral mark.



EFF :
ALL
 27-14-00



AIJ




Page 513
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- the index of the R/AIL indicator
moves smoothly to the neutral mark.
Make sure that no fault indication
comes into view.
5. Close-up
________
Subtask 27-14-00-860-065
A. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2) On the panel 24VU, push the FLT CTL/ELAC2 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(3) Depressurize the Green and Blue hydraulic systems (Ref. TASK 29-2300-864-001) (Ref. TASK 29-10-00-864-003).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-00-410-051
B. Close Access
(1) Close the access door :
(a) 575KB for the left aileron.
(b) 675KB for the right aileron.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822.
(5) Remove the access platform(s).



EFF :
ALL
 27-14-00


R 
AIJ




Page 514
Feb 01/07

TASK 27-14-00-760-001
Electrical Test of the Aileron Servo Controls
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
To confirm the cause of an aileron servocontrol fault (flight control
computer, aircraft wiring or servocontrol).
In this procedure, you will interchange the wiring between two servocontrols
(the one that you think is unserviceable and one that you know is
serviceable).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
99D27103500000

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
2 WARNING NOTICE(S)
1 SWITCH SERVO CTL AIL



EFF :
ALL
 27-14-00



AIJ




Page 515
Nov 01/10

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R

27-96-00-710-020

3. __________
Job Set-up

Subtask 27-14-00-860-066

27-96-00-740-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
57-51-37-000-007
57-51-37-400-007

A. Aircraft Maintenance Configuration

R
R
R
R

(1) Depressurize the aircraft hydraulic systems


(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
Subtask 27-14-00-865-061

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Operational Test of the Side Stick Assembly


(Activation for the BITE Test)
BITE Test of the EFCS (Ground Scanning)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Removal of the Access Panel 575AT(675AT)
Installation of the Access Panel 575AT(675AT)

B. Open, safety and tag this(these) circuit breaker(s):


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-14-00



AIJ




Page 516
Aug 01/07

Subtask 27-14-00-941-058
C. Safety Precautions
R

(1) Put a WARNING NOTICE(S) in position to tell persons not to use these
controls:
- The CAPT and F/O side sticks.
(2) Put WARNING NOTICES in position to tell persons not to operate the
hydraulic systems.
Subtask 27-14-00-010-056
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
applicable zone:
- For the fault on the servocontrol 33CE1 or 33CE3, at zone 575.
- For the fault on the servocontrol 33CE2 or 33CE4, at zone 675.
(2) Open the applicable trailing edge access panels (Ref. TASK 57-51-37000-007):
(a) FOR 33CE1, 33CE3
- The access panel 575AT.
(b) FOR 33CE2, 33CE4
- The access panel 675AT.
Subtask 27-14-00-480-052
E. Installation of the Tool
(1) If the fault is on the servocontrol:
(a) For 33CE1 or 33CE3:
- Disconnect the electrical connectors 33CE1-A and 33CE3-A.
(b) For 33CE2 or 33CE4:
- Disconnect the electrical connectors 33CE2-A and 33CE4-A.
(2) Connect the SWITCH SERVO CTL AIL (99D27103500000) to the disconnected
electrical connectors.



EFF :
ALL
 27-14-00



AIJ




Page 517
Nov 01/10

Subtask 27-14-00-865-062

R
R

F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

4. Procedure
_________

Subtask 27-14-00-760-050

A. Electrical Test of the Aileron Servo Controls

R
R

(1) Do the operational test of the side stick assembly (Activation for
the BITE test) (Ref. TASK 27-96-00-710-020).

R
R

(2) Do a BITE Test of the EFCS (Ground Scanning) (Ref. TASK 27-96-00-740001):

R
R

(a) If the fault is the same, do a check of the aircraft wiring and
of the flight control computer (Ref. TSM).

R
R

(b) If the fault is on the other side, replace the defective


servocontrol.



EFF :
ALL
 27-14-00



AIJ




Page 518
Aug 01/07

5. Close-up
________

Subtask 27-14-00-865-063

A. Open, safety and tag this(these) circuit breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

Subtask 27-14-00-080-052

B. Removal of the Tool

(1) Disconnect the SWITCH SERVO CTL AIL (99D27103500000).

(2) Connect the electrical connectors:

R
R

(a) For the servocontrol 33CE1 or 33CE3:


- 33CE1-A and 33CE3-A.

R
R

(b) For the servocontrol 33CE2 or 33CE4:


- 33CE2-A and 33CE4-A.



EFF :
ALL
 27-14-00



AIJ




Page 519
Aug 01/07

Subtask 27-14-00-865-064

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

Subtask 27-14-00-410-056

D. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R

(2) Close the trailing edge access-panels 575AT or 675AT (Ref. TASK 5751-37-400-007).

Subtask 27-14-00-942-063

E. Put the aircraft back to its initial configuration.

(1) Remove the warning notice(s).

(2) Remove the access platform(s).



EFF :
ALL
 27-14-00



AIJ




Page 520
Aug 01/07

AILERON AND HYDRAULIC ACTUATION - INSPECTION/CHECK


__________________________________________________
TASK 27-14-00-220-001
Check Aileron Servo Controls and Hinge Bearings for Excessive Play and
Condition
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 271400-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
97A27003000007
98D27303000001
98D27303003001
98D27303022000
98D27903500000

1
1
1
1
1
2

warning notices
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
GAGE,ASSY-PUSH-PULL
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-14-00



AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-14-00-200-001
27-14-41-200-001
27-14-51-000-001
27-14-51-200-001
27-14-51-400-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
27-14-00-991-004
27-14-00-991-006

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Aileron Servo Control Oscillations
Inspection/Check of the Aileron
Removal of the Aileron Servo Control
Check of the Aileron Servo Control
Installation of the Aileron Servo Control
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Fig. 601
Fig. 602

3. __________
Job Set-up
Subtask 27-14-00-865-050
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-00-860-050
B. Aircraft Maintenance Configuration
R

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).


(2) On the center pedestal, make sure that the flap and slat control
lever is in the O position.



EFF :
ALL
 27-14-00



AIJ




Page 602
Aug 01/08

(3) On the center pedestal, make sure that the speedbrake control lever
is in the RET position.
(4) On the overhead panel 23VU, make sure that the FLT CTL/ELAC 1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
Subtask 27-14-00-010-055
C. Get Access
(Ref. Fig. 601/TASK 27-14-00-991-004)
R

(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at zone
575 for the left aileron.
(2) Open the access doors 575KB, 575MB, 590AB, 590BB.

(3) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at zone
675 for the right aileron.
(4) Open the access doors 675KB, 675MB, 690AB, 690BB.
Subtask 27-14-00-480-050
D. Installation of the tools.
(1) Lock the 2 side stick controllers with the PIN-SIDE STICK LOCKING
(98D27903500000).
(2) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(3) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001) as follow:
- at the trailing edge of the aileron
- between the two servo controls.
(4) Install the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) on the trailing edge of the aileron.
(Ref. Fig. 601/TASK 27-14-00-991-004)
Adjust the spindle of the dial indicator to its mid travel.
NOTE : With the CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
____
(98D27303022000), you can use the auto-record function. For
more information about the auto-record function, refer to the
manufacturers instruction manual.



EFF :
ALL
 27-14-00



AIJ




Page 603
Feb 01/11

R
R

Location of the Tools


Figure 601/TASK 27-14-00-991-004



EFF :
ALL
 27-14-00



AIJ




Page 604
Feb 01/07

(Ref. Fig. 602/TASK 27-14-00-991-006)


Subtask 27-14-00-863-062
E. Pressurize the Green and Blue hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-10-00-863-003).
4. Procedure
_________
Subtask 27-14-00-210-052
A. Check for General Condition
(1) Do a visual check of the servo control bearings.
(2) Do a visual check of the aileron hinge bearings.
(3) Make sure that the that the liners are not damaged.
NOTE : The liner is a coat of teflon between the bearing case and the
____
ball. It lets the ball turn with a minimum of friction (self
lubricating).
If you can see the liner, replace the related servo control
(Ref. TASK 27-14-51-000-001) and (Ref. TASK 27-14-51-400-001).
Subtask 27-14-00-220-050
B. Check of the Aileron Servo Controls and Hinge Bearings for too much Play
and Condition
(1) On the panel 24VU, release the FLT CTL/ELAC 2 pushbutton switch (the
OFF legend comes on).
NOTE : The check is only given for one surface. Do the same
____
operations for the other surface.
R
R
R

(2) On the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER


(98D27303000001), connect a GAGE ASSY - PUSH-PULL TOOL GAGE,ASSYPUSH-PULL (97A27003000007) (or equivalent).
(3) Apply 30 daN (67.4426 lbf) in the up direction on the trailing edge.
NOTE : If you see oscillations when the servo control is in active
____
mode, do a check of these oscillations (Ref. TASK 27-14-00200-001)



EFF :
ALL
 27-14-00



AIJ




Page 605
Aug 01/08

R
R

CHECK TOOL (DIGITAL) 98D27303022000 (Auto-recording Function)


Figure 602/TASK 27-14-00-991-006



EFF :
ALL
 27-14-00



AIJ




Page 606
Feb 01/07

(4) Continue to apply this force and set the dial indicator to zero.
(5) Release the force.
(6) At the same position, apply 30 daN (67.4426 lbf) in the down
direction on the trailing edge.
(7) Continue to apply this force and read the value on the dial
indicator.
(8) Release the force on the trailing edge.
R
R
R
R
R

(9) For each measurement, if the distance is more than 10 mm (0.3937 in.)
between the two positions:
- repair the structure/aileron, structure/servo control or servo
control/aileron bearings (Ref. TASK 27-14-41-200-001), (Ref. TASK
27-14-51-200-001).

R
R
R

NOTE : This 10 mm (0.3937 in.) value includes 4 mm (0.1574 in.) of


____
surface bending as the result of 30 daN (67.4426 lbf) applied
force.

(10) Change the aileron control from ELAC 2 to ELAC 1:


(a) On the panel 24VU, push the FLT CLT/ELAC 2 pushbutton switch (the
OFF legend goes off).
(b) On the panel 23VU, release the FLT CTL/ELAC 1 pushbutton switch
(the OFF legend comes on).

(11) At the same position, apply 30 daN (67.4426 lbf) in the up direction
on the trailing edge.

(12) Continue to apply this force and set the dial indicator to zero.

(13) Release the force.

(14) At the same position, apply 30 daN (67.4426 lbf) in the down
direction on the trailing edge.

(15) Continue to apply this force and read the value on the dial
indicator.

(16) Release the force on the trailing edge.

(17) For each measurement, if the distance is more than 10 mm (0.3937 in.)
between the two positions:
- repair the structure/aileron, structure/servo control or servo
control/aileron bearings (Ref. TASK 27-14-41-200-001), (Ref. TASK
27-14-51-200-001).



EFF :
ALL
 27-14-00



AIJ




Page 607
Aug 01/08

NOTE : This 10 mm (0.3937 in.) value includes 4 mm (0.1574 in.) of


____
surface bending as the result of 30 daN (67.4426 lbf) applied
force.
5. Close-up
________
Subtask 27-14-00-080-050
A. Removal of the Tools.
(Ref. Fig. 601/TASK 27-14-00-991-004)
R
R
R
R
R

(1) Remove the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER


(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) , the GAGE ASSY - PUSH-PULL TOOL GAGE,ASSY-PUSH-PULL
(97A27003000007) and the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001).
(2) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the two side
stick controllers.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-00-410-055
B. Close Access

R
R

(1) Close the access doors 575KB, 575MB, 590AB and 590BB for the left
aileron.

R
R

(2) Close the access doors 675KB, 675MB, 690AB and 690BB for the right
aileron.
(3) Remove the access platform(s).
Subtask 27-14-00-860-051
C. Put the aircraft back to its initial configuration.
(1) Depressurize the Green hydraulic system (Ref. TASK 29-23-00-864-001).
(2) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(3) On the panel 23VU, push the FLT CTL/ELAC 1 pushbutton switch (the OFF
legend goes off).
(4) Remove the warning notice(s).



EFF :
ALL
 27-14-00



AIJ




Page 608
Aug 01/08

(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-14-00


R 
AIJ




Page 609
Feb 01/07

TASK 27-14-00-220-002
Check of the Aileron Servo Controls Fluid Reserve Piston Position with the
Hydraulic Reservoirs Depressurized
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 271400-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

rule
warning notices
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-14-00-614-001
29-14-00-614-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector



EFF :
ALL
 27-14-00



AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
27-14-00-991-003

Pressurize the Green Hydraulic System from the Yellow


Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 603

3. __________
Job Set-up
Subtask 27-14-00-010-054
A. Get access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.


(2) Open the access doors 575KB, 675KB.
Subtask 27-14-00-860-052
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the center pedestal, make sure that the speedbrake control lever
is in the RET position.
(3) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(4) On each servo control (1), make sure that the indicator of the
fluid-reserve (2) piston is in the maximum extended position.
(Ref. Fig. 603/TASK 27-14-00-991-003)
(5) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(6) Depressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-14-00



AIJ




Page 611
Feb 01/11

R
R

Aileron Servo Control


Figure 603/TASK 27-14-00-991-003



EFF :
ALL
 27-14-00



AIJ




Page 612
Feb 01/07

(7) Put warning notices in position to tell persons not to pressurize the
hydraulic systems:
- on the ground service panels,
- in the cockpit, on the HYD section of the overhead panel 40VU.
(8) Put a warning notice on the access door 195BB to tell persons not to
pressurize the hydraulic reservoirs.
4. Procedure
_________
R

(Ref. Fig. 603/TASK 27-14-00-991-003)


Subtask 27-14-00-220-053
A. Check of the Position of the Fluid Reserve Piston of the Aileron Servo
Controls
(1) After three hours, on the fluid reserve (2), with a rule make sure
that the indicator does not retract more than 32 mm (1,2598 in.).
- If the indicator retracts more than 32 mm (1.2598 in.), the
pressure and return line closing valves are not sealed. You must
remove the servo control (1) for repair.
5. Close-up
________
Subtask 27-14-00-410-054
A. Close access
(1) Close the access doors 575KB, 675KB.
(2) Remove the access platform(s).
Subtask 27-14-00-860-053
B. Put the Aircraft Back to its Initial Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Pressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-14-00



AIJ




Page 613
Feb 01/07

TASK 27-14-00-200-001
Check of the Aileron Servo Control Oscillations
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
98D27303003001
98D27303022000
98D27903500000

1
1
1
2

warning notices
ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-14-51-000-003
27-14-51-400-003
29-10-00-863-003
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Aileron Servo-Control Servovalve
Installation of the Aileron Servo-Control Servovalve
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-14-00



AIJ




Page 614
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-23-00-863-001
29-23-00-864-001

Pressurize the Green Hydraulic System from the Yellow


Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU

3. __________
Job Set-up
Subtask 27-14-00-860-054
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Put the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and F/O
side sticks.
(3) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(4) Make sure that the flap and slat control lever is in the fully
retracted position.
(5) On the overhead panel 23VU:
- release the FLT CTL/SEC 1 pushbutton switch (on this pushbutton
switch the OFF legend comes on).
(6) On the overhead panel 24VU:
- release the FLT CTL/SEC 2 pushbutton switch (on this pushbutton
switch the OFF legend comes on)
- release the FLT CTL/SEC 3 pushbutton switch (on this pushbutton
switch the OFF legend comes on).
(7) On the panel 23VU, make sure that the FLT CTL/ELAC 1 pushbutton
switch is pushed (on this pushbutton switch, the OFF and FAULT
legends are off).
(8) On the panel 24VU, make sure that the FLT CTL/ELAC 2 pushbutton
switch is pushed (on this pushbutton switch, the OFF and FAULT
legends are off).



EFF :
ALL
 27-14-00


R 
AIJ




Page 615
Feb 01/07

Subtask 27-14-00-480-051
B. Installation of the Tools
R

(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE at zone 590 (690).
(2) Install the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) on the wing structure, near the aileron.
(3) Put the pointer of the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) at the trailing edge of the aileron.
4. Procedure
_________
Subtask 27-14-00-220-054
A. Check of the Oscillation of the Servo Control of Each Aileron
(1) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(2) On the dial indicator, measure the amplitude of the oscillations.
If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (33CE3, 33CE4).
(3) Pressurize the Green hydraulic system (Ref. TASK 29-23-00-863-001).
(4) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(5) On the dial indicator, measure the amplitude of the oscillations.
If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (33CE1, 33CE2) (Ref. TASK 27-14-51000-003) (Ref. TASK 27-14-51-400-003).
5. Close-up
________
Subtask 27-14-00-080-051
A. Removal of the Tools
(1) Remove the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000).
(2) Remove the PIN-SIDE STICK LOCKING (98D27903500000).



EFF :
ALL
 27-14-00



AIJ




Page 616
Feb 01/11

Subtask 27-14-00-860-055
B. Put the aircraft back to its initial configuration.
(1) Depressurize the Green hydraulic system (Ref. TASK 29-23-00-864-001).
(2) On the panel 23VU, push the FLT CTL/SEC 1 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(3) On the panel 24VU, push the FLT CTL/SEC 2 and FLT CTL/SEC 3
pushbutton switches (on these pushbutton switches the OFF legend goes
off).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-14-00-942-062
C. Remove the maintenance equipement.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).



EFF :
ALL
 27-14-00



AIJ




Page 617
Feb 01/07

AILERON - REMOVAL/INSTALLATION
______________________________
TASK 27-14-41-000-001
Removal of the Aileron
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R

No specific
No specific
No specific
No specific
No specific
98D27104001000
98D27104002001

1
1
1
AR
1
1

safety barriers
ACCESS PLATFORM 4M (13 FT)
CRANE 100KG (220 LB)
TRESTLE - PADDED
WARNING NOTICE(S)
FRAME-LIFTING ASSEMBLY,AILERON
SUPPORT-AILERON ACTUATOR



EFF :
ALL
 27-14-41



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------23-61-41-000-001
27-50-00-866-009
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
57-51-37-000-005
57-51-37-000-007
27-14-41-991-001
27-14-41-991-002

Removal of the Static Discharger


Retraction of the Flaps on the Ground
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Removal of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Removal of the Access Panel 575AT(675AT)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-41-991-001)
Subtask 27-14-41-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in position in the cockpit to tell persons


not to operate the flight controls.
Subtask 27-14-41-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(3) Depressurize the Green and the Blue hydraulic systems (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-14-41



AIJ




Page 402
Nov 01/10

R
R

Aileron - Location and Detail


Figure 401/TASK 27-14-41-991-001



EFF :
ALL
 27-14-41



AIJ




Page 403
Feb 01/07

(4) Depressurize the applicable hydraulic reservoir (Ref. TASK 29-14-00614-001).


R
Subtask 27-14-41-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-41-010-050
D. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the applicable
zone 575 or 675.
(2) Remove the applicable access panels (Ref. TASK 57-51-37-000-007),
(Ref. TASK 57-51-37-000-005):
- for the left wing, remove 575AT, 575MB, 575KB, 575LB, 590AB, 590BB
- for the right wing, remove 675AT, 675MB, 675KB, 675LB, 690AB,
690BB.
(3) Remove the static dischargers so that you do not cause damage to them
(Ref. TASK 23-61-41-000-001).
(4) Loosen the screws (1), (3) and (5) to let the upper and lower aileron
seals (2), (4) and (6) move.
(5) Manually move the aileron to get access to the actuators and the
hinges.
NOTE : The internal flutter dampening system of the actuators will
____
keep the aileron in position.
(6) To prevent damage to the hydraulic pipes install the SUPPORT-AILERON
ACTUATOR (98D27104002001) and attach it with the screw fasteners.



EFF :
ALL
 27-14-41



AIJ




Page 404
May 01/10

4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-41-991-001, 402/TASK 27-14-41-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-41-020-053
A. Removal of the Aileron
(1) Remove the nuts (61), the washers (60), the bolts (69) and the
locking plates (68).
(2) Remove and discard the cotter pins (65) from the locking caps (64).
(3) Remove the locking caps (64), the nuts (63) and the washers (62).
(4) Hold the aileron and remove the pins (67).
(5) Manually retract the actuators No. 1 and No. 2 and remove the flanged
bush (66) from each actuator attachment bracket.
(6) Manually move the aileron to the highest position.
(7) Install the FRAME-LIFTING ASSEMBLY,AILERON (98D27104001000):
(a) Make sure that the side plates on the FRAME-LIFTING
ASSEMBLY,AILERON are correctly installed.
(b) Make sure that the adjuster assemblies on the FRAME-LIFTING
ASSEMBLY,AILERON are as far apart as possible.
R
R
R

(8) Lift the FRAME-LIFTING ASSEMBLY,AILERON with the CRANE 100KG (220
LB). Put the FRAME-LIFTING ASSEMBLY,AILERON around the aileron, at
the same distance from each end.
NOTE : The weight of the aileron and the brackets is 50 kg (110.2311
____
lb).



EFF :
ALL
 27-14-41



AIJ




Page 405
Aug 01/11

R
R

Aileron Attachment - Hinges and Actuators


Figure 402/TASK 27-14-41-991-002- 12 (SHEET 1)



EFF :
ALL
 27-14-41



AIJ




Page 406
Feb 01/07

R
R

Aileron Attachment - Hinges and Actuators


Figure 402/TASK 27-14-41-991-002- 22 (SHEET 2)



EFF :
ALL
 27-14-41



AIJ




Page 407
Feb 01/07

(9) To lock the lifting frame assembly:


CAUTION : DO NOT TIGHTEN THE ADJUSTER ASSEMBLIES ON THE LIFTING FRAME
_______
TOO MUCH OR YOU WILL DAMAGE THE AILERON.
R
R

(a) Tighten the adjuster assemblies to lock the FRAME-LIFTING


ASSEMBLY,AILERON in position.
(10) For hinge No.s 1, 2 and 3:
(a) Remove the nut (75), the bolt (84), the washers (76) and (83),
and the bonding strap (77).
(b) Remove the nut (74), the bolt (73) and the locking plate (72).
(c) Remove and discard the cotter pin (82) from the locking cap (81).
(d) Remove the locking cap (81), the nut (80) and the washer (79).
(11) For hinge No. 5, remove the nut (106), the bolt (97), the washers
(98) and (105), and the bonding strap (99).
(12) For hinge No.s 4 and 5, do the steps that follow:
(a) Remove the nut (107), the bolt (95), the washers (96) and (108),
and the bonding strap (90).
(b) Remove the bolt (94) and the locking plate (93).
(c) Remove and discard the cotter pin (104) from the locking cap
(103).
(d) Remove the locking cap (103), the nut (102) and the washer (101).
(13) Make sure that the aileron is supported by the crane and remove the
hinge pins (61) and (92). Move the aileron aft and away from the wing
and put it on the TRESTLE - PADDED.
(14) If the aileron is to be replaced, loosen the adjuster assemblies and
remove the FRAME-LIFTING ASSEMBLY,AILERON from the aileron.



EFF :
ALL
 27-14-41



AIJ




Page 408
Aug 01/09

Subtask 27-14-41-020-052
B. Removal of the Bushes from the Hinges
(1) For the hinge No. 1, remove the bush (78).
(2) For the hinge No.s 2 and 3, remove the bushes (70) and (78).
(3) For the hinge No.s 4 and 5, remove the bushes (91) and (100).



EFF :
ALL
 27-14-41


R 
AIJ




Page 409
Feb 01/07

TASK 27-14-41-400-001
Installation of the Aileron
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No
No
No
No
No

specific
specific
specific
specific
specific

No specific
98D27104000001
98D27104001000

1
1
AR
AR

ACCESS PLATFORM 4M (13 FT)


CRANE 100KG (220 LB)
SAFETY BARRIER(S)
WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 GUIDE CONE - AILERON
1 FRAME-LIFTING ASSEMBLY,AILERON



EFF :
ALL
 27-14-41



AIJ




Page 410
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
Material No. 05-002
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R

65
82
104

cotter pins
cotter pin
cotter pin

27-14-05 20 -080
27-14-05 31A-110
27-14-05 31A-110

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
23-61-41-400-001
27-14-00-710-001
27-50-00-866-009
29-10-00-863-001
29-10-00-863-003
29-10-00-864-001
29-10-00-864-003

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Installation of the Static Discharger
Operational Test of the Aileron and Hydraulic
Actuation
Retraction of the Flaps on the Ground
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-14-41



AIJ




Page 411
Feb 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-14-00-614-001
57-51-37-000-005
57-51-37-000-007
57-51-37-400-005
57-51-37-400-007
27-14-41-991-001
27-14-41-991-002
27-14-41-991-004

Depressurization of the Hydraulic Reservoirs


Removal of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Removal of the Access Panel 575AT(675AT)
Installation of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Installation of the Access Panel 575AT(675AT)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-41-991-001)
Subtask 27-14-41-941-053
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that the WARNING NOTICE(S) to tell persons not to operate
the flight controls is in position.
Subtask 27-14-41-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are retracted fully (Ref. TASK 27-50-00-866009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(3) Make sure that the Green and the Blue Hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).



EFF :
ALL
 27-14-41



AIJ




Page 412
Nov 01/10

(4) Make sure that the applicable hydraulic reservoir is depressurized


(Ref. TASK 29-14-00-614-001).
(5) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below
the applicable zone 575(675).
(6) Make sure that the applicable access panels are removed (Ref. TASK
57-51-37-000-007), (Ref. TASK 57-51-37-000-005):
- for the left wing, panels 575AT, 575MB, 575KB, 575LB, 590AB, 590BB
- for the right wing, panels 675AT, 675MB, 675KB, 675LB, 690AB,
690BB.
Subtask 27-14-41-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-41-991-001, 402/TASK 27-14-41-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-41-420-053
A. Preparation for Installation
(Ref. Fig. 402/TASK 27-14-41-991-002)
(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean:
- the heads of the bolts (84), (95) and (97)
- the nuts (75), (106) and (107)
- the ends of the bonding straps (77), (90) and (99).



EFF :
ALL
 27-14-41


R 
AIJ




Page 413
Aug 01/11

(2) Clean the component interfaces and/or the adjacent areas with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Lubricate these parts with SPECIAL MATERIALS (Material No. 05-002):
- for hinge No.s 2 and 3, the bushes (70)
- the bushes (78), (91) and (100)
- the hinge pins (71) and (92)
- the flanged bushes (66)
- the pins (67)
- the installed bushes in the attachment brackets.
Subtask 27-14-41-420-051
B. Install the Bushes in the Hinges
(1) For the hinge No. 1, install the bush (78).
(2) For the hinge No.s 2 and 3, install the bushes (70) and (78).
(3) For the hinge No.s 4 and 5, install the bushes (91) and (100).
Subtask 27-14-41-560-050
C. Preparation of a Replacement Component
(1) If the aileron is to be replaced, install the FRAME-LIFTING
ASSEMBLY,AILERON (98D27104001000):
(a) Make sure that the side plates on the FRAME-LIFTING
ASSEMBLY,AILERON are correctly installed.
(b) Make sure that the adjuster assemblies on the FRAME-LIFTING
ASSEMBLY,AILERON are as far apart as possible.
R

(2) Lift the FRAME-LIFTING ASSEMBLY,AILERON with the CRANE 100KG (220 LB)
and put the FRAME-LIFTING ASSEMBLY,AILERON around the aileron, at the
same distance from each end.
NOTE : The weight of the aileron and the brackets is 50 kg (110.2311
____
lb).



EFF :
ALL
 27-14-41



AIJ




Page 414
Aug 01/11

(3) To lock the lifting frame assembly:


CAUTION : DO NOT TIGHTEN THE ADJUSTER ASSEMBLIES ON THE LIFTING FRAME
_______
TOO MUCH OR YOU WILL DAMAGE THE AILERON.
(a) Tighten the adjuster assemblies on the FRAME-LIFTING
ASSEMBLY,AILERON to lock the aileron in position.
Subtask 27-14-41-420-052
D. Installation of the Aileron
(1) Use the crane to put the aileron in position.
(2) For hinge No.s 1, 2 and 3, do the steps that follow:
(a) Install the GUIDE CONE - AILERON (98D27104000001) on the hinge
pin (71). Install the hinge pin (71) with the head outboard.
Remove the GUIDE CONE - AILERON.
(b) Make sure that the hinge pin (71) is correctly aligned, so that
the locking plate (72) can be installed.
(c) Install the washer (79) and the nut (80) on the hinge pin (71).
(d) TORQUE the nut (80) to between 4.7 and 5.2 m.daN (34.66 and 38.34
lbf.ft).
(e) Install the locking cap (81) on the nut (80).
(f) Safety the locking cap (81) with the new cotter pin (82).
(g) Install the locking plate (72), the bolt (73) and the nut (74).
(h) Install the bonding strap (77), the washers (76) and (83), the
bolt (84) and the nut (75) (Ref. TASK 20-28-00-912-004).
(3) For hinge No.s 4 and 5, do the steps that follow:
(a) Install the GUIDE CONE - AILERON (98D27104000001) on the hinge
pin (92). Install the hinge pin (92) with the head outboard.
Remove the GUIDE CONE - AILERON.
(b) Make sure that the head of the hinge pin (92) is correctly
aligned, so that the locking plate (93) can be installed.
(c) Install the washer (101) and the nut (102) on the hinge pin (92).



EFF :
ALL
 27-14-41


R 
AIJ




Page 415
May 01/10

(d) TORQUE the nut (102) to between 4.7 and 5.2 m.daN (34.66 and
38.34 lbf.ft).
(e) Install the locking cap (103) on the nut (102).
(f) Safety the locking cap (103) with the new cotter pin (104).
(g) Install the locking plate (93) and the bolt (94).
(h) Install the bonding strap (90), the washers (96) and (108), the
bolt (95) and the nut (107) (Ref. TASK 20-28-00-912-004).
(4) For hinge No. 5, install the bonding strap (99), the washers (98) and
(105), the bolt (97) and the nut (106) (Ref. TASK 20-28-00-912-004).
(5) Hold the aileron, loosen the adjuster assemblies and remove the
FRAME-LIFTING ASSEMBLY,AILERON from the aileron.
(6) Install the flanged bush (66) in each actuator attachment bracket.
(7) Apply COMMON GREASE (Material No. 04-022) to the threads of the pins
(67).
NOTE : In the step that follows, make sure that you do not get
____
Material No. 15-007 on the servocontrol spherical bearings.
(8) Apply STORAGE PRESERVATION (Material No. 15-007) to the eye-ends of
the piston rods on the rounded side only.
(9) Align the eye-ends of the actuators No. 1 and No. 2 with the holes in
the actuator attachment brackets. Install the pins (67) with the
heads outboard.
(10) Make sure that the heads of the pins (67) are correctly aligned, so
that the locking plates (68) can be installed.
(11) Install the washers (62) and the nuts (63) on the pins (67).
(12) TORQUE the nuts (63) to between to between 7.5 and 8.0 m.daN (55.30
and 58.99 lbf.ft).
(13) Install the locking caps (64) on the nuts (63).
(14) Safety the locking caps (64) with the new cotter pins (65).



EFF :
ALL
 27-14-41


R 
AIJ




Page 416
May 01/10

(15) Install the locking plates (68), the washers (60), the bolts (69) and
the nuts (61).
NOTE : In the steps that follow, make sure that you do not get
____
Material No. 15-007 on the servocontrol spherical bearings.
(16) Apply
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


bolts (69)
washers (60) and (62)
nuts (61) and (63)
locking caps (64)
cotter pins (65)
pins (67).

(17) For hinge No.s 1, 2 and 3, apply a layer of STORAGE PRESERVATION


(Material No. 15-007) to:
- the hinge pin (71)
- the bolt (73)
- the nuts (74) and (80)
- the washer (79)
- the locking cap (81)
- the cotter pin (82).
(18) For hinge No.s 4 and 5, apply a layer of STORAGE PRESERVATION
(Material No. 15-007) to:
- the hinge pin (92)
- the bolt (94)
- the washer (101)
- the nut (102)
- the locking cap (103)
- the cotter pin (104).
(19) Remove the SUPPORT-AILERON ACTUATOR.
(20) Move the aileron through its travel range and examine for:
- free movement
- the correct installation of the applicable bonding straps (77),
(90) and (99).
(21) For hinge No.s 1, 2 and 3, seal the bonded items that follow
(Ref. TASK 20-28-00-912-004):
- the bolt (84)
- the nut (75)
- the washers (76) and (83)
- the bonding strap (77).



EFF :
ALL
 27-14-41


R 
AIJ




Page 417
May 01/10

(22) For hinge No.s 4 and 5, seal the bonded items that follow (Ref. TASK
20-28-00-912-004):
- the bolt (95)
- the nut (107)
- the washers (96) and (108)
- the bonding strap (90).
(23) For hinge No. 5, seal the bonded items that follow (Ref. TASK 20-2800-912-004):
- the bolt (97)
- the nut (106)
- the washers (98) and (105)
- the bonding strap (99).
(24) Install the static dischargers (Ref. TASK 23-61-41-400-001).
Subtask 27-14-41-410-050
E. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels (Ref. TASK 57-51-37-400-007),
(Ref. TASK 57-51-37-400-005):
- for the left wing, install 575AT, 575MB, 575KB, 575LB, 590AB, 590BB
- for the right wing, install 675AT, 675MB, 675KB, 675LB, 690AB,
690BB.
Subtask 27-14-41-820-051
F. Adjustment of the Aileron Upper and Lower Seals
(Ref. Fig. 401/TASK 27-14-41-991-001, 403/TASK 27-14-41-991-004)
(1) Manually align the aileron with the trailing edge structure (to its
neutral position).
(2) Make sure that the dimensions W and Z are between 0.0 mm (0.0000 in.)
and 0.5 mm (0.0196 in.). If necessary, adjust the seals (2), (4) and
(6) then tighten the screws (1) and (5).
(3) Loosen the screws (3) on the applicable panels 575AT(675AT),
575KB(675KB), 575LB(675LB) or 575MB(675MB) to let you move the seals
(4).



EFF :
ALL
 27-14-41


R 
AIJ




Page 418
May 01/10

R
R

Aileron - Upper and Lower Seals


Figure 403/TASK 27-14-41-991-004



EFF :
ALL
 27-14-41



AIJ




Page 419
Feb 01/07

(4) Position the seals (4) so that the dimension Y is 18 mm (0.7086 in.)
+ 0 mm (0.0000 in.) - 2 mm (0.0787 in.). Make sure that the dimension
X is between 0.0 mm (0.0000 in.) and 0.5 mm (0.0196 in.). If
necessary, adjust the seals (4) to get the two dimensions, then
TORQUE tighten the screws (3) to between 0.11 and 0.13 m.daN (9.73
and 11.50 lbf.in).
NOTE : Make sure that the seals are not above a level between the
____
upper surface of the access panels and the aileron.
(5) Manually push the aileron up as far as possible. Make sure that the
lower panel seals do not go below the leading edge of the aileron
hinge/actuator points.
(6) Slowly move the aileron to its neutral position and monitor the
seals. Make sure that they do not catch the leading edge of the
aileron hinge/actuator points.
(7) Manually push the aileron down as far as possible. Make sure that the
upper panel seal 575AT(675AT) and the fixed panel seal do not catch
the aileron upper surface.
(8) Move the aileron to its neutral position and monitor the upper seals.
Make sure that they do not catch the aileron hinge/actuator points.
(9) If the seals catch the aileron, loosen the applicable screws (3).
Adjust the seal(s) at the point where they catch and TORQUE tighten
the screws (3) to between 0.11 and 0.13 m.daN (9.73 and 11.50
lbf.in).
(10) Do the steps (3) thru (8) again.
Subtask 27-14-41-863-050
G. Pressurize the Hydraulic Systems
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
(1) Pressurize the Green hydraulic system
(Ref. TASK 29-10-00-863-001).
(2) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-14-41


R 
AIJ




Page 420
May 01/10

Subtask 27-14-41-865-052
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.
Subtask 27-14-41-710-050
J. Operational Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do an operational test on the ailerons (Ref. TASK 27-14-00-710-001).
During the operational test, make sure that the ailerons move
correctly.
5. Close-up
________
Subtask 27-14-41-942-050
A. Removal of Equipment
R

(1) Remove the SAFETY BARRIER(S)S.


(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-41



AIJ




Page 421
Nov 01/10

AILERON - INSPECTION/CHECK
__________________________
R

TASK 27-14-41-200-001
Inspection/Check of the Aileron
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement is more than the limits.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice



EFF :
ALL
 27-14-41



AIJ




Page 601
Feb 01/07

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2
4
6
8
11

bush
flanged bush
flanged bush
flanged bush
bush

27-14-05
27-14-05
27-14-05
27-14-05
27-14-05

31A-170A
21 -150
21 -150
21 -150
31A-170A

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-14-41-000-001
27-14-41-400-001
27-14-41-991-003

Removal of the Aileron


Installation of the Aileron
Fig. 601

3. __________
Job Set-up
Subtask 27-14-41-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-14-41-010-051
B. Get Access
(1) Remove the applicable aileron (Ref. TASK 27-14-41-000-001).



EFF :
ALL
 27-14-41



AIJ




Page 602
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-14-41-991-003)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-41-220-051
A. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 15.841 | 15.859 |
|
| 15.807 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6223) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.120 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0047)|
| View B | 15.875 | 15.893 |
|
|
| 15.927 |
|
| ID 2
|(0.6250) |(0.6257) |
|
|
|(0.6270) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-052
B. Dimensions of the Aileron



EFF :
ALL
 27-14-41



AIJ




Page 603
Feb 01/07

R
R

Aileron Fits and Clearances


Figure 601/TASK 27-14-41-991-003



EFF :
ALL
 27-14-41



AIJ




Page 604
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 19.030 | 19.043 |
|
| 19.006 |
|
|
| OD 2
|(0.7492) |(0.7497) |
|
|(0.7482) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.089 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0035)|
| View B | 19.050 | 19.071 |
|
|
| 19.095 |
|
| ID 3
|(0.7500) |(0.7508) |
|
|
|(0.7517) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-053
C. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 15.841 | 15.859 |
|
| 15.806 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6222) |
|
|
|
|
|
| 0.016 | 0.054 |
|
| 0.124 |
|
|
|
| (0.0006)| (0.0021)|
|
|(0.0048)|
| View B | 15.875 | 15.895 |
|
|
| 15.930 |
|
| ID 4
|(0.6250) |(0.6257) |
|
|
|(0.6271) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-054
D. Dimensions of the Aileron



EFF :
ALL
 27-14-41


R 
AIJ




Page 605
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 15.841 | 15.859 |
|
| 15.822 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6229) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.072 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0028)|
| View B | 15.862 | 15.875 |
|
|
| 15.894 |
|
| ID 1
|(0.6244) |(0.6250) |
|
|
|(0.6257) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-055
E. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View C | 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 7
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| View C | 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 8
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-056
F. Dimensions of the Aileron



EFF :
ALL
 27-14-41


R 
AIJ




Page 606
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View C | 22.184 | 22.205 |
|
| 22.160 |
|
|
| OD 7
|(0.8733) |(0.8742) |
|
|(0.8724) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.089 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0035)|
| View C | 22.212 | 22.225 |
|
|
| 22.249 |
|
| ID 9
|(0.8744) |(0.8750) |
|
|
|(0.8759) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-057
G. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View C | 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 7
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| View C | 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 6
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-058
H. Dimensions of the Aileron



EFF :
ALL
 27-14-41


R 
AIJ




Page 607
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View C | 26.968 | 26.981 |
|
| 26.944 |
|
|
| OD 6
|(1.0617) |(1.0622) |
|
|(1.0607) |
|
|
|
|
|
| 0.007 | 0.040 |
|
| 0.088 |
|
|
|
| (0.0002)| (0.0015)|
|
|(0.0034)|
| View C | 26.988 | 27.008 |
|
|
| 27.032 |
|
| ID 10 |(1.0625) |(1.0633) |
|
|
|(1.0642) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-059
J. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View D | 15.841 | 15.859 |
|
| 15.807 |
|
|
| OD 14 |(0.6236) |(0.6243) |
|
|(0.6223) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.120 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0047)|
| View D | 15.875 | 15.893 |
|
|
| 15.927 |
|
| ID 11 |(0.6250) |(0.6257) |
|
|
|(0.6270) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-060
K. Dimensions of the Aileron



EFF :
ALL
 27-14-41


R 
AIJ




Page 608
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View D | 19.030 | 19.043 |
|
| 19.006 |
|
|
| OD 11 |(0.7492) |(0.7497) |
|
|(0.7482) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.089 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0035)|
| View D | 19.050 | 19.071 |
|
|
| 19.095 |
|
| ID 13 |(0.7500) |(0.7508) |
|
|
|(0.7517) |
|
------------------------------------------------------------------------------Subtask 27-14-41-220-061
L. Dimensions of the Aileron
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View D | 15.841 | 15.859 |
|
| 15.822 |
|
|
| OD 14 |(0.6236) |(0.6243) |
|
|(0.6229) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.072 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0028)|
| View D | 15.862 | 15.875 |
|
|
| 15.894 |
|
| ID 12 |(0.6244) |(0.6250) |
|
|
|(0.6257) |
|
------------------------------------------------------------------------------Subtask 27-14-41-020-056
M. Replacement of Unserviceable Items
(1) If you find unserviceable items, replace the applicable item(s) as
follows:
(a) For View B:
- install a new bush (2)
- install a new flanged bush (4).



EFF :
ALL
 27-14-41


R 
AIJ




Page 609
Feb 01/07

(b) For View C:


- install a new flanged bush (6)
- install a new flanged bush (8).
(c) For View D:
- install a new bush (11).
5. Close-up
________
Subtask 27-14-41-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable aileron (Ref. TASK 27-14-41-400-001).
Subtask 27-14-41-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-41


R 
AIJ




Page 610
Feb 01/07

CHECK VALVE (1626GM,1627GM) - REMOVAL/INSTALLATION


__________________________________________________
TASK 27-14-42-000-001
Removal of the Check Valve 1626GM(1627GM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27604000000
98D27803000000

1
AR
1
1

circuit breaker(s) safety clip(s)


safety barriers
CONTAINER 1 L (1/4 USGAL)
WARNING NOTICE(S)
COLLAR-SAFETY, SPOILER
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-14-42



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-60-00-866-002
29-10-00-864-001
29-14-00-614-001
29-23-00-860-001
57-51-37-000-004
27-14-42-991-001
27-14-42-991-002

Extension of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Depressurize the Green Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-42-991-001, 402/TASK 27-14-42-991-002)
Subtask 27-14-42-941-054
A. Safety Precautions
R
R

(1) Put the safety barriers in position.

R
R

(2) Put a WARNING NOTICE(S) on the ground service connection of the Green
hydraulic system to tell persons not to pressurize it.

R
R

(3) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the flight control system.
Subtask 27-14-42-860-051
B. Aircraft Maintenance Configuration
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the


flap/slat control lever.
(3) Disconnect the isolation coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).



EFF :
ALL
 27-14-42



AIJ




Page 402
Nov 01/10

Check Valve 1626GM


Figure 401/TASK 27-14-42-991-001



EFF :
ALL
 27-14-42



AIJ




Page 403
Nov 01/10

R
R

Check Valve 1627GM


Figure 402/TASK 27-14-42-991-002



EFF :
ALL
 27-14-42



AIJ




Page 404
Feb 01/07

(4) Depressurize the applicable hydraulic system.


WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.
(a) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864001).
(b) Depressurize the Green hydraulic system reservoir (Ref. TASK 2914-00-614-001).
Subtask 27-14-42-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/FIRE VALVE/G/ENG1
1703GK
C13
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
Subtask 27-14-42-010-050
D. Get Access
(1) Put the access platform in position:
(a) FOR 1626GM
below zone 580
(b) FOR 1627GM
below zone 680.
(2) If necessary, remove the access panel(s) (Ref. TASK 57-51-37-000004):
(a) FOR 1626GM
remove 575FB
(b) FOR 1627GM
remove 675BB.
(3) Extend the applicable spoilers (Ref. TASK 27-60-00-866-002).



EFF :
ALL
 27-14-42


R 
AIJ




Page 405
Nov 01/10

(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the


servo-control.
R
R
R

NOTE : When you install the COLLAR-SAFETY, SPOILER, make sure that
____
the two pins are positioned aft of the actuator, away from the
spoiler structure.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-42-991-001, 402/TASK 27-14-42-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-42-020-050
A. Removal of the Check Valve
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______

(1) Put a CONTAINER 1 L (1/4 USGAL) for hydraulic fluid below the check
valve (3).
(2) Disconnect the coupling nuts (1) and (3) and remove the check valve
(2). If necessary, remove the clamp block adjacent to the check valve
(2).
(3) Put blanking caps on the disconnected line ends.



EFF :
ALL
 27-14-42



AIJ




Page 406
Nov 01/10

TASK 27-14-42-400-001
Installation of the Check Valve 1626GM(1627GM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


SAFETY BARRIER(S)
WARNING NOTICE(S)
COLLAR-SAFETY, SPOILER
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

AR
AR
1
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
R
R

Material No. 11-026


Material No. 19-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-14-42



AIJ




Page 407
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-50-00-866-008
27-50-00-866-009
27-60-00-866-002
27-64-00-710-001
29-10-00-864-001
29-14-00-614-001
29-14-00-614-002
29-23-00-860-001
29-23-00-860-002
57-51-37-000-004
57-51-37-400-004
27-14-42-991-001
27-14-42-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Depressurize the Green Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-42-991-001)
Subtask 27-14-42-941-055
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the Green hydraulic system.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight control system.



EFF :
ALL
 27-14-42



AIJ




Page 408
Nov 01/10

Subtask 27-14-42-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(3) Make sure that the isolation coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. TASK
29-10-00-864-001).
(5) Make sure that the Green hydraulic system reservoir is depressurized
(Ref. TASK 29-14-00-614-001).
(6) Make sure that the access platform is in position:
(a) FOR 1626GM
below zone 580
(b) FOR 1627GM
below zone 680.
(7) Make sure that the access panel(s) are removed (Ref. TASK 57-51-37000-004):
- for the left wing, panel 575FB
- for the right wing, panel 675FB.

R
R

(8) Make sure that the applicable spoilers are extended (Ref. TASK 27-6000-866-002).
(9) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-14-42



AIJ




Page 409
Nov 01/10

Subtask 27-14-42-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/FIRE VALVE/G/ENG1
1703GK
C13
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-42-991-001, 402/TASK 27-14-42-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-42-420-051
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-14-42



AIJ




Page 410
Aug 01/11

Subtask 27-14-42-420-050
B. Installation of the Check Valve
(1) Remove the blanking caps from the line ends.
(2) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads on the
check valve (2) and the coupling nuts (1) and (3).
(3) Install the check valve (2) and tighten the coupling nuts (1) and
(3). If removed, install the clamp block adjacent to the check valve
(2).
(4) Remove the container for the hydraulic fluid from below the check
valve (2).
Subtask 27-14-42-860-052
C. Aircraft Configuration
(1) Remove the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
(2) Retract the spoilers (Ref. TASK 27-60-00-866-002).
(3) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
Subtask 27-14-42-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU HYD/FIRE VALVE/G/ENG1
1703GK
C13
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
Subtask 27-14-42-611-050
E. Fill the Hydraulic Reservoir
(1) Fill the Green hydraulic reservoir (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).



EFF :
ALL
 27-14-42



AIJ




Page 411
Nov 01/10

Subtask 27-14-42-860-054
F. Aircraft Maintenance Configuration
(1) Pressurize the Green hydraulic system reservoir (Ref. TASK 29-14-00614-002).
(2) Connect the isolation coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
Subtask 27-14-42-865-053
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-14-42-710-050
H. Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend and retract the spoilers five times (Ref. TASK 27-64-00-710001) to bleed the Green hydraulic system.
(2) Do an operational test of the spoilers (Ref. TASK 27-64-00-710-001).
(3) Make sure that there are no leaks from the check valve (2) or the
coupling nuts (1) and (3).



EFF :
ALL
 27-14-42



AIJ




Page 412
Nov 01/10

Subtask 27-14-42-865-054
J. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
5. Close-up
________
Subtask 27-14-42-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) If removed, install the access panel(s) (Ref. TASK 57-51-37-400-004):
(a) FOR 1626GM
install 575FB
(b) FOR 1627GM
install 675BB.
Subtask 27-14-42-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18



EFF :
ALL
 27-14-42



AIJ




Page 413
Nov 01/10

Subtask 27-14-42-860-055
C. Aircraft Configuration
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-14-42-942-054
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-42



AIJ




Page 414
Nov 01/10

SERVO CONTROL - AILERON (33CE1,33CE2,33CE3,33CE4) - REMOVAL/INSTALLATION


________________________________________________________________________
TASK 27-14-51-000-001
Removal of the Aileron Servo Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific

1
AR
AR
AR

blanking caps
circuit breaker(s) safety clip(s)
safety barriers
ACCESS PLATFORM 4M (13 FT)
CAP - BLANKING
PLUG - BLANKING
WARNING NOTICE(S)



EFF :
ALL
 27-14-51



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
57-51-37-000-005
57-51-37-000-007
27-14-51-991-001
27-14-51-991-002

Safety Procedures of the Hydraulic System


Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Removal of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Removal of the Access Panel 575AT(675AT)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-51-991-001, 402/TASK 27-14-51-991-002)
Subtask 27-14-51-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to


pressurize the Green and Blue hydraulic systems.

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.
(4) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002)
Subtask 27-14-51-860-054
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the isolation coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).



EFF :
ALL
 27-14-51



AIJ




Page 402
Nov 01/10

R
R

Aileron Servocontrols 33CE1(33CE2) - Green Hydraulic System


Figure 401/TASK 27-14-51-991-001



EFF :
ALL
 27-14-51



AIJ




Page 403
Feb 01/07

R
R

Aileron Servocontrols 33CE3(33CE4) - Blue Hydraulic System


Figure 402/TASK 27-14-51-991-002



EFF :
ALL
 27-14-51



AIJ




Page 404
Feb 01/07

(2) Make sure that the Blue and the Green Hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-003) (Ref. TASK 29-10-00-864001).
(3) Depressurize the applicable reservoirs (Ref. TASK 29-14-00-614-001).
Subtask 27-14-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-51-010-050
D. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the applicable
zone 575(675).
(2) Remove the applicable access panels (Ref. TASK 57-51-37-000-007)
(Ref. TASK 57-51-37-000-005):
(a) FOR 33CE1, 33CE3
remove 575AT, 575KB, 590AB
(b) FOR 33CE2, 33CE4
remove 675AT, 675KB, 690AB.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-51-991-001, 402/TASK 27-14-51-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-14-51


R 
AIJ




Page 405
Nov 01/10

Subtask 27-14-51-020-062
A. Removal of the Aileron Servo Control (ASC)
(1) Manually put and hold the aileron in the fully-up position.
(2) Disconnect the electrical connector (13).
(3) Put blanking caps on the disconnected electrical connector(s).
R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(4) Remove and discard the lockwire from the bolts (12).
(5) Remove the bolts (12), the washers (11) and the clamp blocks (9).
(6) For 33CE1(33CE2), do the steps that follow:
(a) At the pipe brackets near to the inboard and outboard sides of
the ASC:
1
_

Remove the nuts (32), the bolts (28) and the washers (29).

2
_

Disassemble and remove the tubes (30) and the clamp blocks
(31).

(b) Disconnect and remove the return pipe (14) and the pressure pipe
(24).
(c) Put a PLUG - BLANKING or a CAP - BLANKING on the ASC hydraulic
connections and the disconnected line ends.
(d) At the aileron jack-bracket:
1
_

Remove the nut (3), the washer (2) and the bolt (1).

2
_

Remove the locking plate (26).

(e) At the rear-spar jack-bracket:


1
_

Remove the nut (19), the washer (20) and the bolt (21).

2
_

Remove the locking plate (22).



EFF :
ALL
 27-14-51



AIJ




Page 406
Aug 01/11

(7) For 33CE3(33CE4), do the steps that follow:


(a) At the pipe brackets near to the inboard and outboard sides of
the ASC:
1
_

Remove the nuts (30), the bolts (27) and the washers (28).

2
_

Disassemble and remove the clamp blocks (29).

(b) Disconnect and remove the return pipe (14) and the pressure pipe
(23).
R
R

(c) Put a PLUG - BLANKING or a CAP - BLANKING on the ASC hydraulic


connections and the disconnected line ends.
(d) At the aileron jack-bracket:
1
_

Remove the nut (3), the washer (2) and the bolt (1).

2
_

Remove the locking plate (25).

(e) At the rear-spar jack-bracket:


1
_

Remove the nut (20).

2
_

Remove the locking plate (21) from the stud (19).

(8) Remove and discard the cotter pins (4) and (15) from the locking caps
(5) and (16).
(9) Remove the locking caps (5) and (16), the nuts (6) and (17) and the
washers (7) and (18).
Subtask 27-14-51-020-050
R

B. Complete the Removal of the Aileron Servo-Control (ASC)


(1) To decrease the length of the piston rod:
(a) For 33CE1(33CE2), manually move the aileron to the down position.
(b) Hold the ASC (25) (7.4 kg (16.3142 lb)) and remove the pin (27).
(c) Manually move the aileron to the fully up position.
(d) Safety the aileron in this position if the other ASC is not
installed, and remove the pin (23).



EFF :
ALL
 27-14-51



AIJ




Page 407
Aug 01/07

(e) Remove the ASC (25) from the aircraft.


(f) For 33CE3(33CE4), manually move the aileron to the down position.
(g) Hold the ASC (24) (7.4 kg (16.3142 lb)) and remove the pin (26).
(h) Manually move the aileron to the fully up position.
(i) Safety the aileron in this position if the other ASC is not
installed, and remove the pin (22).
(j) Remove the ASC (24) from the aircraft.
R

(2) Remove the flanged bush (8) from each aileron jack-bracket.

R
R

(3) Remove the flanged bush (10) from each rear-spar jack-bracket.

(4) Install these parts on the removed ASC:


- the clamp blocks (9)
- the washers (11)
- the bolts (12).
NOTE : The clamp blocks (9), the washers (11) and the bolts (12) must
____
stay with the removed ASC.



EFF :
ALL
 27-14-51



AIJ




Page 408
Aug 01/07

TASK 27-14-51-400-001
Installation of the Aileron Servo Control
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific

1 ACCESS PLATFORM 4M (13 FT)


AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-14-51



AIJ




Page 409
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R
R

Material No. 02-003D


Material No. 04-022
Material No. 05-002
Material No. 11-026
Material No. 15-007
Material No. 15-008
Material No. 19-003
Material No. 19-010

F
NSA 307-110
TYPE IV
HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 2
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
4
15
15

cotter
cotter
cotter
cotter

pin
pin
pin
pin

27-14-05
27-14-05
27-14-05
27-14-05



EFF :
ALL
 27-14-51



AIJ




20
21
20
21

-080
-090
-080
-090

Page 410
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
27-14-00-710-001
27-14-00-820-001
29-10-00-863-001
29-10-00-863-003
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
57-51-37-000-005
57-51-37-000-007
57-51-37-400-005
57-51-37-400-007
27-14-51-991-001
27-14-51-991-002
FOR FIN 33CE2, 33CE4
29-23-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
Operational Test of the Aileron and Hydraulic
Actuation
Adjustment of the Aileron
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Removal of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Removal of the Access Panel 575AT(675AT)
Installation of the Access Panels 575KB(675KB),
575LB(675LB), 575MB(675MB)
Installation of the Access Panel 575AT(675AT)
Fig. 401
Fig. 402
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-14-51-991-001, 402/TASK 27-14-51-991-002)
Subtask 27-14-51-941-067
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that there is a WARNING NOTICE(S) in the cockpit to tell
persons not to pressurize the Green and Blue Hydraulic systems.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.



EFF :
ALL
 27-14-51



AIJ




Page 411
Nov 01/10

Subtask 27-14-51-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the isolation coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(2) Make sure that the Blue and the Green Hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-003) (Ref. TASK 29-10-00-864001).
(3) Make sure that the applicable reservoirs are depressurized (Ref. TASK
29-14-00-614-001).
(4) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below
the applicable zone 575(675).
(5) Make sure that the applicable access panels are removed (Ref. TASK
57-51-37-000-007) (Ref. TASK 57-51-37-000-005):
(a) FOR 33CE1, 33CE3
panels 575AT, 575KB, 590AB
(b) FOR 33CE2, 33CE4
panels 675AT, 675KB, 690AB.
Subtask 27-14-51-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 401/TASK 27-14-51-991-001, 402/TASK 27-14-51-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-14-51


R 
AIJ




Page 412
Nov 01/10

Subtask 27-14-51-420-059
A. Preparation for Installation
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026):
- for 33CE1(33CE2), the pins (23) and (27)
- for 33CE3(33CE4), the pins (22) and (26)
- the flanged bushes (8) and (10)
- the interfaces of the aileron and rear-spar jack-brackets.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Make sure that the hydraulic line end-fittings are serviceable.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE


_______
SPECIAL MATERIAL.
THIS MATERIAL IS DANGEROUS.
(5) Lubricate these parts with SPECIAL MATERIALS (Material No. 05-002):
- for 33CE1(33CE2), the pins (23) and (27)
- for 33CE3(33CE4), the pins (22) and (26)
- the flanged bushes (8) and (10)
- the installed bushes in the outboard-flanges of the aileron and
rear-spar jack-brackets.
Subtask 27-14-51-420-050
B. Installation of the Aileron Servo Control (ASC)

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Install the flanged bush (8) into the inboard-flange of each aileron
jack-bracket.
(2) Install the flanged bush (10) into the inboard-flange of each
rear-spar jack-bracket.



EFF :
ALL
 27-14-51



AIJ




Page 413
Aug 01/11

(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the


eye-ends of the piston rods on the rounded sides only.
NOTE : Do not get Material 15-007 on the Servocontrol Spherical
____
Bearings.
(4) For 33CE1(33CE2), install the ASC (25):
(a) Hold the ASC (7.4 kg (16.3142 lb)) in a horizontal position.
(b) Align the body eye-end with the bushes in the flanges of the
rear-spar jack-bracket.
(c) Install the pin (23).
(d) Manually move the aileron to the down position. Do this until the
piston-rod eye-end and the bushes of the aileron jack-bracket are
aligned.
(e) Install the pin (27).
(5) For 33CE3(33CE4), install the ASC (24):
(a) Hold the ASC (7.4 kg (16.3142 lb)) in a horizontal position.
(b) Align the body eye-end with the bushes in the flanges of the
rear-spar jack-bracket.
(c) Install the pin (22).
(d) Manually move the aileron to the down position. Do this until the
piston-rod eye-end and the bushes of the aileron jack-bracket are
aligned.
(e) Install the pin (26).
(6) For easier access to the installed ASC manually, put and hold the
aileron in the fully-up position.
(7) Apply COMMON GREASE (Material No. 04-022) to the threads of the pins:
- for 33CE1(33CE2), the pins (23) and (27)
- for 33CE3(33CE4), the pins (22) and (26).



EFF :
ALL
 27-14-51


R 
AIJ




Page 414
Aug 01/11

Subtask 27-14-51-420-058
C. Complete the Installation of the Aileron Servo Control (ASC)
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) For 33CE1(33CE2), do the steps that follow:
(Ref. Fig. 401/TASK 27-14-51-991-001)
(a) Install the washers (7) and (18) and the nuts (6) and (17).
(b) TORQUE the nuts (6) and (17) to between 7.5 and 8.0 m.daN (55.30
and 58.99 lbf.ft).
(c) Install the locking caps (5) and (16) on the pins (27) and (23).
(d) Safety the items that follow:
- the locking cap (5) with the new cotter pin (4)
- the locking cap (16) with the new cotter pin (15)
(e) At the rear-spar jack-bracket:
1
_

Put the locking plate (22) on the pin (23).

2
_

Align the bolt hole in the locking plate (22) with the holes
in the flanges of the rear-spar jack-bracket.

3
_

Install the bolt (21), the washer (20) and the nut (19).

(f) At the aileron jack-bracket:

1
_

Put the locking plate (26) on the pin (27).

2
_

Align the bolt hole in the locking plate (26) with the hole in
the flange of the aileron jack-bracket.

3
_

Install the bolt (1), the washer (2) and the nut (3).
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______

(g) Remove the PLUG - BLANKING from the disconnected hydraulic


connections.



EFF :
ALL
 27-14-51



AIJ




Page 415
Aug 01/11

(h) Apply HYDRAULIC FLUIDS (Material No. 02-003D) to the joints of


the pipes (14) and (24), then install the pressure pipe (24) and
the return pipe (14).
(i) At the pipe brackets near to the inboard and outboard sides of
the ASC (25):
1
_

Assemble the clamp blocks (31) and the tubes (30).

2
_

Install the washers (29), the bolts (28) and the nuts (32).

(j) Attach the clamp blocks (9) to the ASC (25) with the bolts (12)
and the washers (11).
(k) TORQUE the bolts (12) to between 0.16 and 0.20 m.daN (14.15 and
17.69 lbf.in).
R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.


_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
(l) Safety the bolts (12) with MISCELLANEOUS (Material No. 19-010).
(m) Remove the CAP - BLANKING from the electrical connections and
connect the electrical connector (13) to the ASC (25).
(n) Clean the electrical connector (13) with a MISCELLANEOUS
(Material No. 19-003) made moist with CLEANING AGENTS (Material
No. 11-026).
(o) Apply a continuous layer of STORAGE PRESERVATION (Material No.
15-008) to the electrical connector (13).
NOTE : In the step that follows, make sure that you do not get
____
Material No. 15-007 on the servocontrol spherical
bearings.
(p) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolt (1), the washer (2) and the nut (3)
- the cotter pin (4), the locking cap (5), the nut (6) and the
washer (7)
- the washers (11) and the bolts (12)
- the cotter pin (15), the locking cap (16), the nut (17) and the
washer (18)
- the nut (19), the washer (20) and the bolt (21)
- the head of the pins (23) and (27)
- the bolts (28), the washers (29) and the nuts (32).



EFF :
ALL
 27-14-51



AIJ




Page 416
Aug 01/11

(2) For 33CE3(33CE4), do the steps that follow:


(Ref. Fig. 402/TASK 27-14-51-991-002)
(a) Install the washers (7) and (18) and the nuts (6) and (17).
(b) TORQUE the nuts (6) and (17) to to between 7.5 and 8.0 m.daN
(55.30 and 58.99 lbf.ft).
(c) Install the locking caps (5) and (16) on the pins (26) and (22).
(d) Safety the items that follow:
- the locking cap (5) with the new cotter pin (4)
- the locking cap (16) with the new cotter pin (15).
(e) At the rear-spar jack-bracket:
1
_

Put the locking plate (21) on the pin (22).

2
_

Align and attach the locking plate (21) to the stud (19).

3
_

Install the nut (20).

(f) At the aileron jack-bracket:


1
_

Put the locking plate (25) on the pin (26).

2
_

Align the bolt hole in the locking plate (25) with the hole in
the flange of the aileron jack-bracket.

3
_

Install the bolt (1), the washer (2) and the nut (3).
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______

(g) Remove the PLUG - BLANKING from the disconnected hydraulic


connections.
R

(h) Apply HYDRAULIC FLUIDS (Material No. 02-003D) to the joints of


the pipes (14) and (23), then install the pressure pipe (23) and
the return pipe (14).
(i) At the pipe brackets near to the inboard and outboard sides of
the ASC (24):
1
_

Assemble the clamp blocks (29).

2
_

Install the washers (28), the bolts (27) and the nuts (30).



EFF :
ALL
 27-14-51



AIJ




Page 417
Aug 01/11

R
R

(j) Make sure that the clearance between the pipe and the structure
is equal or more than 6 mm (0.2362 in.).

R
R
R
R

NOTE : To measure the clearance between the pipe and the


____
structure, you must measure the distance in the condition
where the movement decreases the distance to its smallest
value.

(k) Attach the clamp blocks (9) to the ASC (24) with the bolts (12)
and the washers (11).

(l) TORQUE the bolts (12) to between 0.16 and 0.20 m.daN (14.15 and
17.69 lbf.in).

R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.


_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.

(m) Safety the bolts (12) with MISCELLANEOUS (Material No. 19-010).

(n) Remove the CAP - BLANKING from the electrical connections and
connect the electrical connector (13) to the ASC (24).

(o) Clean the electrical connector (13) with a MISCELLANEOUS


(Material No. 19-003) made moist with CLEANING AGENTS (Material
No. 11-026).

(p) Apply a continuous layer of STORAGE PRESERVATION (Material No.


15-008) to the electrical connector (13).
NOTE : In the step that follows, make sure that you do not get
____
Material No. 15-007 on the servocontrol spherical
bearings.

(q) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:


- the bolt (1), the washer (2) and the nut (3)
- the cotter pin (4), the locking cap (5), the nut (6) and the
washer (7)
- the washers (11) and the bolts (12)
- the cotter pin (15), the locking cap (16), the nut (17) and the
washer (18)
- the stud (19) and the nut (20)
- the heads of the pins (22) and (26)
- the bolts (27), the washers (28) and the nuts (30).



EFF :
ALL
 27-14-51



AIJ




Page 418
Aug 01/11

Subtask 27-14-51-860-059
D. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
(1) Remove the warning notice that prevents the pressurization of the
Green and Blue Hydraulic systems.
(2) For 33CE1(33CE2):
- pressurize the Green Hydraulic system (Ref. TASK 29-10-00-863-001).
(3) For 33CE3(33CE4):
- pressurize the Blue Hydraulic system (Ref. TASK 29-10-00-863-003).
(4) On the center pedestal, make sure that:
- the slat and flap control-lever is in the 0-degree position
- the speed-brake control-lever is in the RET position.
Subtask 27-14-51-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.
Subtask 27-14-51-710-050
F. Test
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Operate the ailerons.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(a) Operate the ailerons over the full travel range ten times to
bleed the ASC(s).
(b) Make sure that the ailerons are correctly adjusted (Ref. TASK 2714-00-820-001).
(c) Do the operational test of the aileron and hydraulic actuation
(Ref. TASK 27-14-00-710-001).


EFF :
ALL
 27-14-51


R 
AIJ




Page 419
Aug 01/11

(3) Examine and make sure that there are no hydraulic leaks from:
(a) For 33CE1(33CE2):
- the ASC (25)
- the pressure pipe (24)
- the return pipe (14).
(b) For 33CE3(33CE4):
- the ASC (24)
- the pressure pipe (23)
- the return pipe (14).
5. Close-up
________
Subtask 27-14-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other
items.
(2) Install the applicable access panels (Ref. TASK 57-51-37-400-007)
(Ref. TASK 57-51-37-400-005):
(a) FOR 33CE1, 33CE3
install 575AT, 575KB, 590AB
(b) FOR 33CE2, 33CE4
install 675AT, 675KB, 690AB.
(3) Connect the isolation coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
Subtask 27-14-51-942-051
B. Removal of Equipment
(1) Remove the SAFETY BARRIER(S)S.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51


R 
AIJ




Page 420
Aug 01/11

TASK 27-14-51-000-002
Removal of the Hydraulic Filter for the Aileron Servo-Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

blanking plug
circuit breaker(s) safety clip(s)
safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)



EFF :
ALL
 27-14-51



AIJ




Page 421
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
R

27-14-51-991-004

Safety Procedures of the Hydraulic System


Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 403

3. __________
Job Set-up
R

(Ref. Fig. 403/TASK 27-14-51-991-004)


Subtask 27-14-51-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in the cockpit to tell persons not to
pressurize the Green or the Blue hydraulic systems.
(3) Obey the hydraulic system safety procedures (Ref. TASK 29-00-00-910002).
Subtask 27-14-51-860-055
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Depressurize the Green and the Blue system hydraulic reservoirs
(Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-14-51



AIJ




Page 422
Feb 01/07

R
R

Aileron Servo-Control - Hydraulic Filter


Figure 403/TASK 27-14-51-991-004



EFF :
ALL
 27-14-51



AIJ




Page 423
Feb 01/07

Subtask 27-14-51-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-51-010-051
D. Get Access
(1) Put the access platform in position below the applicable zone
575(675).
(2) Remove the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-14-51-991-004)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-020-051
A. Removal of the Hydraulic Filter
(1) Put a container under the applicable filter (2).
(2) Remove and discard the lockwire from the filter (2).
(3) Remove the filter (2).
(4) Remove and discard the packing (1) from the filter (2).



EFF :
ALL
 27-14-51



AIJ




Page 424
Feb 01/07

(5) Install the blanking plug in the opening in the aileron


servo-control.



EFF :
ALL
 27-14-51



AIJ




Page 425
Feb 01/07

TASK 27-14-51-400-002
Installation of the Hydraulic Filter for the Aileron Servo-Control
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-14-51



AIJ




Page 426
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-015
R
R

Material No. 11-026


Material No. 19-003

lockwire, corrosion resistant steel 0,6mm (0.027in)


dia
USA BAC 5001
DACO-5073
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1

packing

27-14-51 01 -020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-14-00-710-001
29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
29-23-00-860-002
27-14-51-991-004

Operational Test of the Aileron and Hydraulic


Actuation
Safety Procedures of the Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 403



EFF :
ALL
 27-14-51



AIJ




Page 427
Aug 01/11

3. __________
Job Set-up
R

(Ref. Fig. 403/TASK 27-14-51-991-004)


Subtask 27-14-51-941-068
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to pressurize the Green or the Blue hydraulic systems.
(3) Obey the hydraulic system safety procedures (Ref. TASK 29-00-00-910002).
Subtask 27-14-51-860-060
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Make sure that the Isolation Coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Make sure that the Green and the Blue system hydraulic reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
(4) Make sure that there is a container under the applicable filter (2).
(5) Make sure that the access platform is in position below the
applicable zone 575(675).
(6) Make sure that the applicable access panel is removed:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.



EFF :
ALL
 27-14-51



AIJ




Page 428
Feb 01/07

Subtask 27-14-51-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 403/TASK 27-14-51-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-420-060
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Remove the blanking plug from the opening in the aileron
servo-control.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-14-51



AIJ




Page 429
Aug 01/11

(4) Lubricate the new packing (1) with COMMON GREASE (Material No. 04015).
Subtask 27-14-51-420-051
B. Installation of the Hydraulic Filter
(1) Install the new packing (1) on the filter (2).
(2) Install the filter (2) complete with the packing (1) in the aileron
servo- control.
(3) TORQUE the filter (2) to between 2.1 and 2.3 m.daN (15.48 and 16.96
lbf.ft).
(4) Safety the filter (2) with lockwire, corrosion resistant steel 0,6mm
(0.027in) dia.
Subtask 27-14-51-860-061
C. Aircraft Maintenance Configuration
(1) Connect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
(2) Remove the container from below the filter (2).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-51-865-055
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.
Subtask 27-14-51-710-051
E. Test
(1) Do an operational test of the aileron (Ref. TASK 27-14-00-710-001).
(2) Examine the filter (2) for leaks.



EFF :
ALL
 27-14-51


R 
AIJ




Page 430
Feb 01/07

5. Close-up
________
R

(Ref. Fig. 403/TASK 27-14-51-991-004)


Subtask 27-14-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
Subtask 27-14-51-942-054
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51



AIJ




Page 431
Feb 01/07

TASK 27-14-51-000-003
Removal of the Aileron Servo-Control Servovalve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


protective cover
safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)



EFF :
ALL
 27-14-51



AIJ




Page 432
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
R

27-14-51-991-005

Safety Procedures of the Hydraulic System


Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 404

3. __________
Job Set-up
R

(Ref. Fig. 404/TASK 27-14-51-991-005)


Subtask 27-14-51-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to pressurize
the Green or the Blue hydraulic systems.
(3) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
Subtask 27-14-51-860-056
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Depressurize the Green and the Blue hydraulic system reservoirs
(Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-14-51



AIJ




Page 433
Feb 01/07

R
R

Aileron Servo-Control Servovalve


Figure 404/TASK 27-14-51-991-005



EFF :
ALL
 27-14-51



AIJ




Page 434
Feb 01/07

Subtask 27-14-51-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-51-010-052
D. Get Access
(1) Put the access platform in position below the applicable zone
575(675).
(2) Remove the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
4. Procedure
_________
R

(Ref. Fig. 404/TASK 27-14-51-991-005)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-020-052
A. Removal of the Aileron Servo-Control Servovalve
(1) Put a container under the applicable servovalve (3).
(2) Remove and discard the lockwire from the screws (1).
(3) Remove the screws (1) and the washers (2).
(4) Carefully disengage and remove the servovalve (3) from the electrical
connector (6) and the aileron servo control.



EFF :
ALL
 27-14-51



AIJ




Page 435
Feb 01/07

(5) Remove and discard the packings (4) and (5).


(6) Put the protective cover on the aileron servo-control servovalve
interface.



EFF :
ALL
 27-14-51



AIJ




Page 436
Feb 01/07

TASK 27-14-51-400-003
Installation of the Aileron Servo-Control Servovalve
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 4 m (13 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-14-51



AIJ




Page 437
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
R
R

Material No. 11-026


Material No. 19-003
Material No. 19-010

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
4
5
5

packing
packing
packing
packing

27-14-51
27-14-51
27-14-51
27-14-51

01
01
01
01

-170
-170A
-120
-120A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-14-00-710-001
29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
29-23-00-860-002
27-14-51-991-005

Operational Test of the Aileron and Hydraulic


Actuation
Safety Procedures of the Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 404



EFF :
ALL
 27-14-51



AIJ




Page 438
Aug 01/11

3. __________
Job Set-up
R

(Ref. Fig. 404/TASK 27-14-51-991-005)


Subtask 27-14-51-941-069
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to pressurize the Green or the Blue hydraulic systems.
(3) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
Subtask 27-14-51-860-062
B. Aircraft Maintenance Configuration
(1) Make sure that the Isolation Coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Make sure that the Green and the Blue hydraulic system reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
(4) Make sure that the access platform is in position below the
applicable zone 575(675).
(5) Make sure that the applicable access panel is removed:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.



EFF :
ALL
 27-14-51



AIJ




Page 439
Feb 01/07

Subtask 27-14-51-865-057
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 404/TASK 27-14-51-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-420-061
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the protective cover from the aileron servo-control servovalve
interface.
(2) Clean the component interface and or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-14-51



AIJ




Page 440
Aug 01/11

(4) Lubricate the new packing (4) and the new packing (5) with COMMON
GREASE (Material No. 04-015).
Subtask 27-14-51-420-052
B. Installation of the Aileron Servo-Control Servovalve
(1) Install the new packing (5) on the electrical connector (6) of the
aileron servo- control.
(2) Install the new packings (4) on the aileron servo-control interface.
(3) Put the servovalve (3) in position on the aileron servo-control and
install the washers (2) and the bolts (1).
(4) TORQUE the bolts (1) to between 0.33 and 0.41 m.daN (29.20 and 36.28
lbf.in).
(5) Safety the bolts (1) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-14-51-860-063
C. Aircraft Maintenance Configuration
(1) Connect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
(2) Remove the container from under the servovalve (3).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-51-865-058
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.
Subtask 27-14-51-710-052
E. Test
(1) Do an operational test of the aileron (Ref. TASK 27-14-00-710-001).
(2) Examine the servovalve (3) for leaks.



EFF :
ALL
 27-14-51


R 
AIJ




Page 441
Feb 01/07

5. Close-up
________
R

(Ref. Fig. 404/TASK 27-14-51-991-005)


Subtask 27-14-51-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
Subtask 27-14-51-942-056
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51



AIJ




Page 442
Feb 01/07

TASK 27-14-51-000-004
Removal of the Aileron Servo-Control Solenoid Valve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


protective cover
safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)



EFF :
ALL
 27-14-51



AIJ




Page 443
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
R

27-14-51-991-006

Safety Procedures of the Hydraulic System


Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 405

3. __________
Job Set-up
R

(Ref. Fig. 405/TASK 27-14-51-991-006)


Subtask 27-14-51-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to pressurize
the Green or the Blue hydraulic systems.
(3) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
Subtask 27-14-51-860-057
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Depressurize the Green and the Blue hydraulic system reservoirs
(Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-14-51



AIJ




Page 444
Feb 01/07

R
R

Aileron Servo-Control Solenoid Valve


Figure 405/TASK 27-14-51-991-006



EFF :
ALL
 27-14-51



AIJ




Page 445
Feb 01/07

Subtask 27-14-51-865-059
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-51-010-053
D. Get Access
(1) Put the access platform in position below the applicable zone
575(675).
(2) Remove the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
4. Procedure
_________
R

(Ref. Fig. 405/TASK 27-14-51-991-006)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-020-053
A. Removal of the Aileron Servo-Control Solenoid Valve
(1) Put a container under the applicable solenoid valve (6).
(2) Remove and discard the lockwire from the bolts (5).
(3) Remove the bolts (5).
(4) Carefully disengage the electrical connector (4) from the aileron
servo-control and remove the solenoid valve (6).



EFF :
ALL
 27-14-51



AIJ




Page 446
Feb 01/07

(5) Discard the packings (1), (2) and (3).


(6) Put the protective cover on the aileron servo-control solenoid valve
interface



EFF :
ALL
 27-14-51



AIJ




Page 447
Feb 01/07

TASK 27-14-51-400-004
Installation of the Aileron Servo-Control Solenoid Valve
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-14-51



AIJ




Page 448
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
R
R

Material No. 11-026


Material No. 19-003
Material No. 19-010

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
2
3
3

packings
packing
packing
packing

27-14-51
27-14-51
27-14-51
27-14-51

01
01
01
01

-060
-070
-120
-120A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-14-00-710-001
29-00-00-910-002
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
29-23-00-860-002
27-14-51-991-006

Operational Test of the Aileron and Hydraulic


Actuation
Safety Procedures of the Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 405



EFF :
ALL
 27-14-51



AIJ




Page 449
Aug 01/11

3. __________
Job Set-up
R

(Ref. Fig. 405/TASK 27-14-51-991-006)


Subtask 27-14-51-941-070
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to pressurize the Green or the Blue hydraulic systems.
(3) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002)
Subtask 27-14-51-860-064
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Make sure that the Isolation Coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Make sure that the Green and the Blue hydraulic system reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
(4) Make sure that there is a container below the applicable aileron
servo-control.
(5) Make sure that the access platform is in position below the
applicable zone 575(675).
(6) Make sure that the applicable access panel is removed:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.



EFF :
ALL
 27-14-51



AIJ




Page 450
Feb 01/07

Subtask 27-14-51-865-060
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 405/TASK 27-14-51-991-006)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-420-062
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the protective cover from the aileron servo-control interface.
(2) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-14-51



AIJ




Page 451
Aug 01/11

(4) Lubricate the new packings (1), the new packing (2) and the new
packing (3) with COMMON GREASE (Material No. 04-015).
Subtask 27-14-51-420-053
B. Installation of the Aileron Servo-Control Solenoid Valve
(1) Install the new packing (3) on the electrical connector (4).
(2) Install the new packings (1) and the new packing (2) in the
applicable openings in the solenoid valve (6).
(3) Put the solenoid valve (6), complete with the packings (1) and (2),
in position on the aileron servo-control and install the bolts (5).
(4) TORQUE the bolts (5) to between 0.21 and 0.26 m.daN (18.58 and 23.00
lbf.in).
(5) Safety the bolts (5) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-14-51-860-065
C. Aircraft Maintenance Configuration
(1) Connect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
(2) Remove the container from under the solenoid valve (6).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-51-865-061
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.
Subtask 27-14-51-710-053
E. Test
(1) Do an operational test of the aileron (Ref. TASK 27-14-00-710-001).
(2) Examine the solenoid valve (6) for leaks.



EFF :
ALL
 27-14-51


R 
AIJ




Page 452
Feb 01/07

5. Close-up
________
Subtask 27-14-51-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- for the left wing, panel 575KB
- for the right wing, panel 675KB.
Subtask 27-14-51-942-057
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51


R 
AIJ




Page 453
Feb 01/07

TASK 27-14-51-000-005
Removal of the Linear Variable-Differential Transformer (LVDT) of the AileronServo Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


protective cover
safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)



EFF :
ALL
 27-14-51



AIJ




Page 454
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
R

27-14-51-991-007

Depressurize the Green Hydraulic System


Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 406

3. __________
Job Set-up
R

(Ref. Fig. 406/TASK 27-14-51-991-007)


Subtask 27-14-51-941-062
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in the cockpit to tell persons not to
pressurize the Green or the Blue hydraulic systems.
Subtask 27-14-51-860-058
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Depressurize the Green and the Blue hydraulic system reservoirs
(Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-14-51



AIJ




Page 455
Feb 01/07

R
R

Aileron Servo-Control LVDT


Figure 406/TASK 27-14-51-991-007



EFF :
ALL
 27-14-51



AIJ




Page 456
Feb 01/07

Subtask 27-14-51-865-062
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-14-51-010-054
D. Get Access
(1) Put the access platform in position under the applicable zone
575(675).
(2) Remove the applicable access panel:
- for the left wing, panel 575AT
- for the right wing, panel 675AT.
4. Procedure
_________
R

(Ref. Fig. 406/TASK 27-14-51-991-007)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-020-054
A. Removal of the LVDT of the Aileron Servo Control
(1) Put a container under the applicable LVDT (6).
(2) Remove and discard the lockwire from the bolts (3).
(3) Remove the bolts (3), the washers (2), the lockwasher (4) and the
bonding leads (5).



EFF :
ALL
 27-14-51



AIJ




Page 457
Feb 01/07

(4) Carefully disengage the LVDT (6) from the electrical connector (1)
and remove the LVDT (6).
NOTE : A spring in the aileron servo-control will push the LVDT (6)
____
away from the aileron servo control.
(5) Discard the packings (8) and (9).
(6) Put the protective cover on the aileron servo-control LVDT interface.



EFF :
ALL
 27-14-51



AIJ




Page 458
Feb 01/07

TASK 27-14-51-400-005
Installation of the Linear Variable-Differential Transformer (LVDT) of the
Aileron Servo-Control
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

safety barriers
warning notice
container 1 l (0.2641 USgal)
access platform 4 m (13 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-14-51



AIJ




Page 459
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
R
R

Material No. 11-026


Material No. 19-003
Material No. 19-010

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------8
9
9

packing
packing
packing

27-14-51 01 -130
27-14-51 01 -120
27-14-51 01 -120A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-14-00-710-001
27-14-00-820-001
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
29-23-00-860-001
29-23-00-860-002
27-14-51-991-007

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the Aileron and Hydraulic
Actuation
Adjustment of the Aileron
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 406



EFF :
ALL
 27-14-51



AIJ




Page 460
Aug 01/11

3. __________
Job Set-up
R

(Ref. Fig. 406/TASK 27-14-51-991-007)


Subtask 27-14-51-941-071
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that there is a warning notice in the cockpit to tell
persons not to pressurize the Green or the Blue hydraulic systems.
Subtask 27-14-51-860-066
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Make sure that the Isolation Coupling of the Power Transfer Unit
(PTU) is disconnected (Ref. TASK 29-23-00-860-001).
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864003).
(3) Make sure that the Green and the Blue hydraulic system reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
(4) Make sure that there is a container below the applicable aileron
servo-control.
(5) Make sure that the access platform is in position below the
applicable zone 575(675).
(6) Make sure that the applicable access panel is removed:
- for the left wing, panel 575AT
- for the right wing, panel 675AT.



EFF :
ALL
 27-14-51



AIJ




Page 461
Feb 01/07

Subtask 27-14-51-865-063
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
(Ref. Fig. 406/TASK 27-14-51-991-007)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-420-063
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Remove the protective cover from the aileron servo-control interface.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-14-51



AIJ




Page 462
Aug 01/11

(4) Lubricate the new packing (8) and the new packing (9) with COMMON
GREASE (Material No. 04-015).
Subtask 27-14-51-420-054
B. Installation of the LVDT of the Aileron Servo-Control
(1) Install the new packing (8) on the LVDT (6).
(2) Install the new packing (9) on the electrical connector (7).
(3) Put the LVDT (6) in position on the aileron servo-control.
NOTE : You must compress the spring in the aileron servo-control to
____
do this.
(4) Install the bonding leads (5), the lockwasher (4), the washers (2)
and the bolts (3).
(5) TORQUE the bolts (3) to between 0.46 and 0.54 m.daN (40.70 and 47.78
lbf.in).
(6) Do a bonding check on the LVDT (6) (Ref. TASK 20-28-00-912-004).
(7) Safety the bolts (3) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-14-51-860-067
C. Aircraft Maintenance Configuration
(1) Connect the Isolation Coupling of the Power Transfer Unit (PTU)
(Ref. TASK 29-23-00-860-002).
(2) Remove the container from under the LVDT (6).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-14-51-865-064
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2.



EFF :
ALL
 27-14-51


R 
AIJ




Page 463
Feb 01/07

Subtask 27-14-51-710-054
E. Test
(1) Do a check of the aileron adjustment (Ref. TASK 27-14-00-820-001).
(2) Do a operational test of the aileron (Ref. TASK 27-14-00-710-001).
(3) Examine the LVDT (6) for leaks.
5. Close-up
________
R

(Ref. Fig. 406/TASK 27-14-51-991-007)


Subtask 27-14-51-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- for the left wing, panel 575AT
- for the right wing, panel 675AT.
Subtask 27-14-51-942-060
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51



AIJ




Page 464
Feb 01/07

TASK 27-14-51-000-006
Removal of the Actuator Eye-End of the Aileron Servo-Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
0U144765
0U144768

safety barriers
warning notice
1 WRENCH - AILERON SERVOCONTROL ADJUSTMENT
1 HOLDING WRENCH - AILERON SERVOCONTROL ADJUSTMENT

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-14-51-000-001
27-14-51-991-008

Removal of the Aileron Servo Control


Fig. 407



EFF :
ALL
 27-14-51



AIJ




Page 465
Feb 01/07

3. __________
Job Set-up
Subtask 27-14-51-941-073
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-14-51-020-055
B. Removal of the Aileron Servo-Control Block
(1) Remove the aileron servo-control block (Ref. TASK 27-14-51-000-001).
(2) Take the servo-control block to a workshop bench and clamp it so that
you can do work on the eye-end.
4. Procedure
_________
R

(Ref. Fig. 407/TASK 27-14-51-991-008)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-020-056
A. Removal of the Actuator Eye-End of the Aileron Servo-Control
(1) Remove and discard the lockwire from the two screws (1).
(2) Remove the screws (1), the washers (2) and the lockplate (8).
(3) Use the WRENCH - AILERON SERVOCONTROL ADJUSTMENT (0U144765) and
HOLDING WRENCH - AILERON SERVOCONTROL ADJUSTMENT (0U144768) to
release the eye-end (13) from the actuator body.
NOTE : A torque force of between 6 m.daN (44.2 lbf.ft) and 7 m.daN
____
(51.6 lbf.ft) will be necessary to release the eye-end.



EFF :
ALL
 27-14-51



AIJ




Page 466
Feb 01/07

R
R

Actuator Eye End - Location and Details


Figure 407/TASK 27-14-51-991-008



EFF :
ALL
 27-14-51



AIJ




Page 467
Feb 01/07

NOTE : There is a Linear


____
the servo-control
the eye-end. When
also removed. The

Variable Displacement Transducer (LVDT) in


block. The core of the LVDT is attached to
you remove the eye-end, the LVDT core is
coil of the LVDT stays in the actuator body.

(4) Remove the eye-end (13):


CAUTION : DO NOT CAUSE DAMAGE TO THE LVDT CORE WHEN YOU REMOVE THE
_______
ACTUATOR EYE-END. THE CORE AND THE COIL ARE A PAIR. IT WILL
BE NECESSARY TO USE THEM AGAIN.
(a) Remove the eye-end (13) from the actuator body, together with the
LVDT core (7).
(b) Remove the lockwasher (9) from the end of the actuator body.
Subtask 27-14-51-220-054
B. Dimensional Checks
(1) Measure and write down dimension X (the length from the end of the
LVDT core to the rear face of the eye-end flange).
Subtask 27-14-51-020-057
C. Remove the LVDT core (7).
(1) Remove and discard the lockwire from the two screws (16).
(2) Remove the screws (16), the washers (15) and the lockplate (14).
(3) Compress the spring (6) and remove the slotted-cup (10). Remove the
spring (6) and the blocking-cup (11).
(4) Remove the pin (12).
(5) Remove the LVDT core (7) from the adjusting nut (4) to release:
- the LVDT core (7)
- the adjusting nut (4)
- the washers (3) and (5).



EFF :
ALL
 27-14-51


R 
AIJ




Page 468
Feb 01/07

TASK 27-14-51-400-006
Installation of the Actuator Eye-End of the Aileron Servo-Control
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
R
R

specific
specific
specific
specific

No specific
0U144765
0U144768

safety barriers
soft brush
warning notice
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 WRENCH - AILERON SERVOCONTROL ADJUSTMENT
1 HOLDING WRENCH - AILERON SERVOCONTROL ADJUSTMENT



EFF :
ALL
 27-14-51



AIJ




Page 469
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-010
Material No. 04-021
Material No. 11-026
Material No. 19-003
Material No. 19-010

USA MIL-G-25013
GREASE SYNTHETIC, BALL+ROLLER BEARING (Ref. 20-31-00)
USA MIL-P-8116
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-14-51-000-001
27-14-51-400-001
27-14-51-991-008

Removal of the Aileron Servo Control


Installation of the Aileron Servo Control
Fig. 407

3. __________
Job Set-up
Subtask 27-14-51-941-074
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
operate the flight controls.
Subtask 27-14-51-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the aileron servo-control block is removed (Ref. TASK
27-14-51-000-001).



EFF :
ALL
 27-14-51



AIJ




Page 470
Feb 01/07

Subtask 27-14-51-865-066
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
R

(Ref. Fig. 407/TASK 27-14-51-991-008)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-210-056
A. Preparation for Installation
(1) Make sure that the servo-control block is clamped securely to the
workshop bench and that you have access to the actuator.
(2) Make sure that the parts retained from the removed component are in
the correct condition.
Subtask 27-14-51-110-051
B. Clean these Parts
(1) Clean the eye-end with a MISCELLANEOUS (Material No. 19-003) made
moist with CLEANING AGENTS (Material No. 11-026).
(2) Clean all the parts kept from the removed component with CLEANING
AGENTS (Material No. 11-026) and a soft brush.



EFF :
ALL
 27-14-51



AIJ




Page 471
Feb 01/07

Subtask 27-14-51-420-055
C. Installation of the Actuator Eye-End
(1) Lubricate the washers (3) and (5) and the blocking-cup (11) with
COMMON GREASE (Material No. 04-010).
(2) Lubricate the lockwasher (9) with COMMON GREASE (Material No. 04021).
(3) Install the washer (3) on the adjusting nut (4).
(4) Install the washer (3), the adjusting nut (4) and the washer (5) on
the eye-end (13).
(5) Install the LVDT core (7):
CAUTION : DO NOT MIX THE CORES/COILS FROM DIFFERENT LDVT UNITS.
_______
THEY ARE IN PAIRS.
(a) Install the LVDT core (7) into the adjusting nut (4).
(b) Set the flat on the LVDT core (7) so that you can install the pin
(12).
(c) Assemble the blocking-cup (11), the spring (6) and the
slotted-cup (10) to the LVDT core (7).
Subtask 27-14-51-820-052
D. Adjustment
(1) Use the adjusting nut (4) to set the core length (dimension X) to
the value that you wrote down.
(2) When the dimension X is correct, install the lockplate (14) on the
eye-end flange, located against the adjusting nut.
(3) Install the lockplate (14) with the two screws (16) and the washers
(15).
(4) Safety the screws (16) with MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-14-51


R 
AIJ




Page 472
Feb 01/07

Subtask 27-14-51-420-056
E. Complete the Installation of the Actuator Eye-End
(1) Align the four dogs on the lockwasher (9) with the slots on the end
of the actuator body and install the lockwasher (9).
(2) Lubricate the thread of the eye-end with COMMON GREASE (Material No.
04-021).
(3) TORQUE the eye-end into the actuator with the WRENCH - AILERON
SERVOCONTROL ADJUSTMENT (0U144765) and HOLDING WRENCH - AILERON
SERVOCONTROL ADJUSTMENT (0U144768) to between 6.0 and 6.5 m.daN
(44.24 and 47.93 lbf.ft).
(4) Align the lockplate (8) with the lockwasher (9) and with the screw
holes in the eye-end flange.
(5) Install the lockplate (8) on the flange with two screws (1) and
washers (2).
NOTE : If the screw holes in the flange and the lockplate (8) are not
____
aligned, increase the torque by small increments. Continue to
tighten the eye-end until the screw holes are aligned. Do not
exceed 7 m.daN (51.6 lbf.ft).
(6) TORQUE the screws (1) to between 0.21 and 0.26 m.daN (18.58 and 23.00
lbf.in).
(7) Safety the screws (1) with MISCELLANEOUS (Material No. 19-010).
5. Close-up
________
Subtask 27-14-51-420-057
A. Installation of the Aileron Servo-Control Block
(1) Install the Aileron Servo-Control Block (Ref. TASK 27-14-51-400-001).
Subtask 27-14-51-942-065
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.



EFF :
ALL
 27-14-51


R 
AIJ




Page 473
Feb 01/07

(3) Remove the warning notice(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51



AIJ




Page 474
Feb 01/07

SERVO CONTROL - AILERON (33CE1,33CE2,33CE3,33CE4) - INSPECTION/CHECK


____________________________________________________________________
R

TASK 27-14-51-200-001
Check of the Aileron Servo Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------3
4

bush
flanged bush

27-14-05 21 -150
27-14-05 21 -150



EFF :
ALL
 27-14-51



AIJ




Page 601
Feb 01/07

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-14-51-000-001
27-14-51-400-001
27-14-51-991-003

Removal of the Aileron Servo Control


Installation of the Aileron Servo Control
Fig. 601

3. __________
Job Set-up
Subtask 27-14-51-941-072
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-14-51-010-055
B. Get Access
(1) Remove the aileron servo control (Ref. TASK 27-14-51-000-001).
4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-14-51-991-003)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-14-51-220-050
A. Fits and Clearances
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-14-51



AIJ




Page 602
Feb 01/07

R
R

Aileron Servo Control


Figure 601/TASK 27-14-51-991-003



EFF :
ALL
 27-14-51



AIJ




Page 603
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 4
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| View B | 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 5
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-14-51-220-051
B. Fits and Clearances
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 22.184 | 22.205 |
|
| 22.160 |
|
|
| OD 4
|(0.8733) |(0.8742) |
|
|(0.8724) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.089 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0035)|
| View B | 22.212 | 22.225 |
|
|
| 22.249 |
|
| ID 2
|(0.8744) |(0.8750) |
|
|
|(0.8759) |
|
------------------------------------------------------------------------------Subtask 27-14-51-220-052
C. Fits and Clearances
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-14-51


R 
AIJ




Page 604
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 4
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| View B | 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 3
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-14-51-220-053
D. Fits and Clearances
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| View B | 26.968 | 26.981 |
|
| 26.946 |
|
|
| OD 5
|(1.0617) |(1.0622) |
|
|(1.0608) |
|
|
|
|
|
| 0.006 | 0.041 |
|
| 0.087 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0034)|
| View B | 26.987 | 27.009 |
|
|
| 27.033 |
|
| ID 1
|(1.0624) |(1.0633) |
|
|
|(1.0642) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-14-51


R 
AIJ




Page 605
Feb 01/07

Subtask 27-14-51-020-063
E. Replacement of Unserviceable Items
(1) If you find unserviceable items, replace the applicable item(s) as
follows:
(a) For View B:
- install a new bush (3)
- install a new flanged bush (4).
5. Close-up
________
Subtask 27-14-51-410-055
A. Close Access
(1) Install the aileron servo control (Ref. TASK 27-14-51-400-001).
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 27-14-51-942-064
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-14-51


R 
AIJ




Page 606
Feb 01/07

RUDDER - DESCRIPTION AND OPERATION


__________________________________
1. _______
General
(Ref. Fig. 001)
One rudder surface provides the yaw control.
The main control is mechanical (Ref. 27-21).
The trim control is electrically signalled (Ref. 27-22).
The artificial feel (Ref. 27-23) is ensured by:
- a spring rod, the stiffness of which is independent from the flight
conditions,
- a centering spring (Ref. 27-21).
At high speeds, a travel limitation unit limits the rudder travel in
relation to the airspeed (Ref. 27-23 and 22-61 for computation).
This is to prevent the transmission of excessive loads to the structure by
the rudder.
Three fixed-body servocontrols with mechanical input provide the hydraulic
actuation (Ref. 27-24).
The position of the rudder is shown on the lower display unit of the ECAM
system (Ref. 27-25).
A. Interface with the Autoflight System
Interface with the Autoflight System (Ref. 22-60-00).
An electric trim actuator is connected to the artificial feel and trim
unit upstream of the travel limitation unit.
In all the modes, it drives the complete control via a spring device that
the pilots can override.
Two yaw damper servo-actuators are installed between the artificial feel
and trim unit and the travel limitation unit.
They drive the aft control via a differential linkage.
The signals of the yaw damper servo-actuators are added to those of the
pilots up to the maximum travel allowed by the travel limitation unit.
Two transducer units near the pedals send data to the FACs via the ELACs.
B. Interface with the Braking System
Interface with the Braking System (Ref. 32-42).
Levers attached to each pedal provide braking inputs when the pedals turn
about their axis.
C. Interface
Interface
The pedal
nosewheel

with the Nosewheel Steering System


with the Nosewheel Steering System (Ref. 32-51).
transducer units send data to the BSCU via the ELACs for the
steering system.



EFF :
ALL
 27-20-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-20-00



AIJ




Page 2
Feb 01/07

Rudder Block Diagram


Figure 001

EFF :
ALL
 27-20-00




AIJ




Page 3/4
Feb 01/07

RUDDER MECHANICAL CONTROL - DESCRIPTION AND OPERATION


_____________________________________________________
1. _______
General
(Ref. Fig. 001)
Three mechanically-controlled fixed-body servocontrols operate the rudder.
Two interconnected pairs of pedals drive a mechanical linkage. This linkage
is single up to the artificial feel and trim unit and up to the actuating
lever of the middle servocontrol.
An adjuster which consists of a lever-controlled rack assembly is used to
adjust the position of the pedal assembly.
Downstream of the actuating lever of the middle servocontrol, the linkage is
duplicated up to the travel limitation unit (which is fail safe).
Thus, any single disconnection does not involve a loss of travel limitation
without a loss of rudder control. This is to avoid a hidden failure of the
travel limitation due to single failure.
The yaw damper signals are introduced through a differential mechanism,
located downstream of the aft cable run.
2. Component
___________________
Location.
(Ref. Fig. 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------103CM
TENSION REG-RUDDER CONTROL CABLE
125 312AR
27-21-45



EFF :
ALL
 27-21-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-21-00



AIJ




Page 2
Feb 01/07

Rudder Mechanical Control


Figure 001

EFF :
ALL
 27-21-00




AIJ




Page 3/4
Feb 01/07

Location of Rudder Mechanical Control


Figure 002


EFF :
ALL
 27-21-00



AIJ




Page 5
Feb 01/07

3. _____________________
Component Description
A. Cable Tension Regulator
(Ref. Fig. 003)
One cable tension regulator maintains a constant tension on the cable (22
daN plus or minus 3 daN (49.5 lbf plus or minus 7 lbf)).
It has a provision for the installation of a special tool used to install
the regulator on the aircraft.
B. Servocontrol Actuating Spring Rod
The actuating spring rod of the rudder servocontrol prevents the runaway
of the control system if an input lever jams on its servocontrol body.
It permits the control of the other two servocontrols if a spool valve
jams.
C. Centering Spring Rod of the Upper and Middle Servocontrols
This centering spring-rod is used in the event of a rupture or
disconnection of the linkage between the artificial feel and the
middle-servocontrol actuating lever.
It avoids a rudder deflection greater than 2 deg. with vertical
acceleration Mz = 1g and greater than 15 deg. with vertical acceleration
Mz = 2.5g .
D. Rods, Cables
(Ref. Fig. 004)
(1) Rods
The push-pull rods are adjustable or non-adjustable length rods. They
have replaceable ends. In order to eliminate the influence of extreme
temperature differences between outside and inside the rudder, the
control rods on the rudder mechanical linkages are made of carbon
fiber.
(2) Cables
The flexible cables (3.2 mm/0.126 in. dia.) are made of zinc-coated
carbon steel.
The cable end-fittings are foolproofed and turnbuckles are
clip-locked.
The fairleads are of the static type.
Their supports permit the passage of the cable end-fittings.
At bulkheads, the cables are fed through pressure seals.
E. Stops and Rigging Facilities
(1) Pedal stops.
Pedal maximum travel is limited in both directions by non adjustable
stops.



EFF :
ALL
 27-21-00



AIJ




Page 6
Feb 01/07

Cable Tension Regulator


Figure 003


EFF :
ALL
 27-21-00



AIJ




Page 7
Feb 01/07

Connecting Rods and Cable Pressure Seals


Figure 004


EFF :
ALL
 27-21-00



AIJ




Page 8
Feb 01/07

(2) Rudder operational stops.


Maximum input to the servocontrols is limited by the travel
limitation unit.
(3) Rudder travel stops.
These are the stroke end stops (non adjustable) of the servocontrols,
never reached in normal operation.
(4) Rudder structural stops when the servocontrols are not installed.
There are no specially designed stops between the rudder and the
structure of the vertical stabilizer.
(5) Adjustable lever.
The length of one of the levers between the pedals and the tension
regulator is adjustable in order to maintain maximum travel of the
rudder within the design limits.
(6) Rigging pins.
Rigging pin holes are provided.
(7) Pedals position adjustment.
The rudder pedals adjustment range is approximately 0 to 12
graduations.



EFF :
ALL
 27-21-00



AIJ




Page 9
Feb 01/07

RUDDER MECHANICAL CONTROL - MAINTENANCE PRACTICES


_________________________________________________
TASK 27-21-00-840-001
Removal/Installation of the control rod on the rudder mechanical control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
This task permits to do some work on the rudder mechanical control during
gusts or to avoid injury to persons.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No specific
98D27207516000
98D27207547000
98D27207548000

1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


TBD
PIN-RIGGING
PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)



EFF :
ALL
 27-21-00



AIJ




Page 201
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6

cotter pins

27-21-04 21 -120

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002

Energize the Aircraft Electrical Circuits from the


External Power

27-24-00-710-001
29-10-00-863-001
29-10-00-864-001
27-21-00-991-016

Operational Test of the Rudder Hydraulic Actuation


Pressurize the Green Hydraulic System
Depressurize the Green Hydraulic System
Fig. 201

3. __________
Job Set-up
Subtask 27-21-00-010-063
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
access door 312AR.
(2) Open the access door 312AR.
(3) Put access platform in position at zone 325.
(4) Open the access panels 325AL and 325BL at the trailing edge of the
vertical stabilizer.
Subtask 27-21-00-860-065
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002)
(2) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001).



EFF :
ALL
 27-21-00



AIJ




Page 202
Feb 01/11

(3) On the overhead panel 23VU, 24VU, make sure that the ELAC1, ELAC2
pushbutton switches are pushed (the OFF and FAULT legends of these
pushbutton switches are off).
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Put the warning notices on CAPT and F/O pedals to tell persons not to
use the rudder.
(6) Put the warning notice on panel 110VU to tell persons not to use the
rudder trim.
R
R
R
R
R

(7) Install the PIN-RIGGING (98D27207548000) or TBD (98D27207516000) (1)


on the mixer (2) of the artificial feel unit
(Ref. Fig. 201/TASK 27-21-00-991-016)
.
Install the PIN-RIGGING (98D27207547000) or TBD (98D27207516000) (3)
on the cable quadrant (4).
4. Procedure
_________
Subtask 27-21-00-840-050
A. Removal/Installation of the Control Rod on the Rudder Mechanical Control
(Ref. Fig. 201/TASK 27-21-00-991-016)
(1) Removal of the control rod (5).
(a) Cut and discard the cotter pins (6).
(b) Remove the nuts (7) and the washers (8).
(c) Remove bolts (10) and the control rod (5).
(d) Temporarily safety the sliding bushes (9) in the flanged bushes
of the control rod (5) with lockwire corrosion resistant steel
dia 0.8 mm (0.03 in.).

R
R
R

(e) Remove the PIN-RIGGING (98D27207548000) or TBD (98D27207516000)


(1) from the mixer (2) and the PIN-RIGGING (98D27207547000) or
TBD (98D27207516000) (3) from the cable quadrant (4).
(f) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864001)
(g) Refer to the initial procedure.



EFF :
ALL
 27-21-00



AIJ




Page 203
Feb 01/11

R
R

Rudder Mechanical Control - Control Rod


Figure 201/TASK 27-21-00-991-016



EFF :
ALL
 27-21-00



AIJ




Page 204
Feb 01/07

(2) Installation of the control rod (5).


(a) Pressurize the Green hydraulic system
(Ref. TASK 29-10-00-863-001)
R
R
R

(b) Install the PIN-RIGGING (98D27207548000) or TBD (98D27207516000)


(1) on the mixer (2) and the PIN-RIGGING (98D27207547000) or TBD
(98D27207516000) (3) on the cable quadrant (4).
(c) Cut and remove the lockwire which temporarily safeties the
sliding bushes (9) in the flanged bushes of the control rod (5).
(d) Connect the control rod (5) to the mixer (2) of the artificial
feel unit with the bolt (10).
(e) Connect the control rod (5) to the cable quadrant (4) with the
bolt (10).
(f) Install the washers (8), the nuts (7) and tighten them.
(g) Install new cotter pins (6).

R
R
R

(h) Remove the PIN-RIGGING (98D27207548000) or TBD (98D27207516000)


(1) and the PIN-RIGGING (98D27207547000) (3) or TBD
(98D27207516000).
(i) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864001).
Subtask 27-21-00-710-055
B. Do the operational test of the rudder hydraulic actuation (Ref. TASK 2724-00-710-001).
5. Close-up
________
Subtask 27-21-00-410-060
A. Close Access
(1) Close the access panels 325AL, 325BL.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).



EFF :
ALL
 27-21-00



AIJ




Page 205
Feb 01/11

RUDDER MECHANICAL CONTROL - ADJUSTMENT/TEST


___________________________________________
TASK 27-21-00-710-001
Operational Test of the Centering Spring Rod
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-05
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6

cotter pin

27-21-04 22 -100



EFF :
ALL
 27-21-00



AIJ




Page 501
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-61-00-710-001
24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
27-21-00-991-001

Operational Test of the Rudder Travel Limiting


Function
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
Fig. 501

3. __________
Job Set-up
Subtask 27-21-00-710-056
A. Do the operational test of the rudder travel limiting function (Ref. TASK
22-61-00-710-001).
Subtask 27-21-00-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access doors 325BL, 325BR.



EFF :
ALL
 27-21-00



AIJ




Page 502
Feb 01/11

Subtask 27-21-00-860-061
C. Aircraft Maintenance Configuration
(1) Disconnect the input rod (1) from the differential output bellcrank
(Ref. Fig. 501/TASK 27-21-00-991-001)
(Ref. Detail D).

(a) Remove and discard the cotter pin (6).


(b) Remove the nut (5) and the washer (4).
(c) Remove the screw (2) and disconnect the rod (1).
(2) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(3) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(4) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(5) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(6) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
(8) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(9) On the upper ECAM display unit, make sure that there is no warning
related to the AUTO FLT RUD TRV LIM systems.



EFF :
ALL
 27-21-00



AIJ




Page 503
Feb 01/07

R
R

Disconnection of the Rod at the Differential Output Bellcrank


Figure 501/TASK 27-21-00-991-001



EFF :
ALL
 27-21-00



AIJ




Page 504
Feb 01/07

Subtask 27-21-00-865-050
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-21-00-710-050
A. Do this test:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Pull hard on the input rod down
until you come to the mechanical
stop. Hold it in this position (so
that it cannot suddenly move back
to its initial position).

The rudder moves to the right.


On the lower ECAM DU, on the F/CTL
page:
- The RUD pointer moves to the right
mark.

2. Slowly release the rod to allow


for the force set up in the
centering rod.

The rudder slowly returns to zero.

On the lower ECAM DU, on the F/CTL


page:
- The RUD pointer slowly returns to
zero.
3. Push on the input rod up until you The rudder moves to the left.
come to the mechanical stop. Hold
it in this position (so that it
cannot suddenly move back to its
initial position).
On the lower ECAM DU, on the F/CTL
page:
- The RUD pointer moves to the left
mark.



EFF :
ALL
 27-21-00



AIJ




Page 505
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------4. Slowly release the rod to allow
The rudder slowly returns to zero.
for the force set up in the
centering rod.
On the lower ECAM DU, on the F/CTL
page:
- The RUD pointer slowly returns to
zero.
5. Close-up
________
Subtask 27-21-00-860-062
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(4) Connect the input rod (1) to the differential output bellcrank
(Ref. Fig. 501/TASK 27-21-00-991-001)
(Ref. Detail D).
(a) Connect the rod (1) at the bellcrank (3) and install the screw
(2).
(b) Install the washer (4), the nut (5) and the new cotter pin (6).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-21-00-410-050
B. Close Access
(1) Close the access doors 325BR, 325BL.
(2) Remove the access platform(s).



EFF :
ALL
 27-21-00


R 
AIJ




Page 506
Feb 01/11

TASK 27-21-00-820-003
Adjustment of the Rudder Mechanical Control
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

No specific

98A27103500000
98A27103500001
98A27901002000
98D27207516000
98D27207545000
98D27207546000
98D27207547000
98D27207548000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 PROTECTION TOOL-FTU
1 PROTECTION TOOL-FTU
2 PIN,RIGGING-RUDDER CONTROL
1 TBD
1 PIN-RIGGING
1 PIN-RIGGING
1 PIN-RIGGING
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 19-010

lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-21-00



AIJ




Page 507
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------38
38

cotter pins
cotter pins

27-21-04 22 -470
27-21-04 22 -470A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-21-00-820-002
27-21-00-840-001
27-22-00-820-001
27-24-00-710-001
27-24-00-820-001
27-26-00-820-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
53-12-11-000-001
53-12-11-400-001
27-21-61-000-001
27-21-61-400-001
R
R

27-21-00-991-004
27-21-00-991-005

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Adjustment of the Rudder Control-Cables Length
Removal/Installation of the control rod on the rudder
mechanical control
Adjustment of the Rudder Trim Actuation
Operational Test of the Rudder Hydraulic Actuation
Adjustment of the Rudder Neutral Position
Adjustment of the Yaw Damper Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Installation of the Cockpit Floor Panels from FR1
thru FR12
Removal of the Rudder Control Cables (for corrective
action)
Installation of the Rudder Control Cables (for
corrective action)
Fig. 502
Fig. 503



EFF :
ALL
 27-21-00



AIJ




Page 508
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-00-991-012
27-21-00-991-003

Fig. 504
Fig. 505

3. __________
Job Set-up
Subtask 27-21-00-860-052
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU, make sure that:
- the FLT CTL/FAC1 and FLT CTL/ELAC1 pushbutton switches are pushed
(on these pushbutton switches, the FAULT and OFF legends are off).
(3) On the overhead panel 24VU, make sure that:
- the FLT CTL/FAC2 and FLT CTL/ELAC2 pushbutton switches are pushed
(on these pushbutton switches, the FAULT and OFF legends are off).
(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator is at 0.
(6) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(7) Put warning notices on the CAPT and F/O pedals to tell persons not to
use the rudder.
(8) Put a warning notice on the panel 110VU to tell persons not to use
the rudder trim.
Subtask 27-21-00-010-062
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in zone


121.
(2) Open the access door 811.



EFF :
ALL
 27-21-00



AIJ




Page 509
Feb 01/11

R
R

(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone
312.
(4) Open the access door 312AR.

R
R

(5) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in zone
325.
(6) Open the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR,
325EL, 325ER.

(7) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at the access door
822.
(8) Open the access door 822.
(9) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
(10) In the cockpit, remove the access panel 211GF (Ref. TASK 53-12-11000-001).
Subtask 27-21-00-865-054
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-21-00-860-066
D. Remove the control rod (25) between the mixer (41) and the cable quadrant
(24) (Ref. TASK 27-21-00-840-001).



EFF :
ALL
 27-21-00



AIJ




Page 510
Feb 01/11

4. Procedure
_________
Subtask 27-21-00-820-056
A. Adjustment of the Forward Mechanical Control
(Ref. Fig. 502/TASK 27-21-00-991-004)
R

(1) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (51) on the


connection relay of the CAPT rudder pedals (60).
(2) Push the pin of the transducer unit (58).
NOTE : The pin is part of the transducer unit (58).
____
You must push the pin freely. If this is not the case, adjust the
length of the rod (59) as follows :
(a) Cut and remove the lockwire from the nuts.
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (59) until you can push the pin
freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).

(3) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (51) on the


connection relay of the F/O pedals (52). You must install and remove
the rigging pin easily.
If not, do these operations :
(a) Cut and remove the lockwire from the nuts of the rod (55).
(b) Loosen the nuts.
(c) Release the lockwashers.



EFF :
ALL
 27-21-00



AIJ




Page 511
Aug 01/07

R
R

Rudder Mechanical Control


Figure 502/TASK 27-21-00-991-004



EFF :
ALL
 27-21-00



AIJ




Page 512
Feb 01/07

(d) Adjust the length of the rod (55) until you can install and
remove the rigging pin (51) freely.
(e) Engage the lockwashers.
(f) TORQUE the nuts to 1.374 m.daN (10.13 lbf.ft).
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03in.).
(4) Push the pin of the transducer unit (53).
NOTE : The pin is part of the transducer unit (53).
____
You must push the pin freely. If this is not the case, adjust the
length of the rod (54) as follows :
(a) Cut and remove the lockwire from the nuts.
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (54) until you can push the pin
freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).
(5) Remove the rigging pin (51) from the connection relay of the F/O
rudder pedals.



EFF :
ALL
 27-21-00



AIJ




Page 513
Feb 01/07

(6) Adjustment of the Force Transducer Unit (FTU) (56).


R

(a) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (51) on


the input lever of the cable tension regulator (57).
If you cannot engage the rigging pin (51) freely, adjust the
lenght of the FTU (56), as follows:

(b) Install the PROTECTION TOOL-FTU (98A27103500000):

1
_

Engage the upper and lower web (64) between the FTU (56) and
the tension regulator (57).

2
_

Install the bolt (63) and tighten.

(c) Install the PROTECTION TOOL-FTU (98A27103500001):


1
_

Engage the upper and lower web (62) between the FTU (56) and
the bellcranck (61).

2
_

Install the bolt (63) and tighten.

(d) Adjust the FTU (56):


1
_

Cut and discard the lockwires.

2
_

Loosen the nuts (72) and (75) and disengage the lockwashers
(71) and (74).

3
_

Turn the rod body (73) until you can engage the rigging pin.

4
_

Engage the lockwashers (71) and (74) and TORQUE the nut (72)
to 1.2 m.daN (106.19 lbf.in) and the nut (75) to 0.5 m.daN
(44.24 lbf.in). Do not safety at this time.

(e) Remove the PROTECTION TOOL-FTU (98A27103500000).

(f) Remove the PROTECTION TOOL-FTU (98A27103500001).


(g) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).
(h) Remove the rigging pin (51) from the input lever of the cable
tension regulator (57).
(i) Remove the rigging pin (51) from the connection relay of the F/O
rudder pedals.



EFF :
ALL
 27-21-00



AIJ




Page 514
Aug 01/07

Subtask 27-21-00-820-057
B. Adjustment of the Cable Tension
(1) Adjust the tension of the cables (Ref. TASK 27-21-00-820-002).
NOTE : After the adjustment, remove the rigging pins.
____
NOTE : If you cannot adjust the control cables, do a visual
____
inspection on the pulleys and the tension regulator. If they
are in good condition, replace the control cables (Ref. TASK
27-21-61-000-001) (Ref. TASK 27-21-61-400-001).
Subtask 27-21-00-820-058
C. Adjustment of the Rear Mechanical Control
(Ref. Fig. 503/TASK 27-21-00-991-005, 504/TASK 27-21-00-991-012)
R

(1) Install the PIN-RIGGING (98D27207547000) or TBD (98D27207516000) (42)


on the cable quadrant (24).

(2) Install the PIN-RIGGING (98D27207548000) or TBD (98D27207516000) (40)


on the mixer (41) of the artificial feel unit.
(3) Install the control rod (25) (Ref. TASK 27-21-00-840-001).
You must be able to install the bolts of the rod (25) easily.
If not, do these operations :
(a) Cut and remove the lockwire from the nuts of the rod (25).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (25) until you can push the bolts in
freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with MISCELLANEOUS (Material No. 19-010).
(4) Adjust the rudder trim (Ref. TASK 27-22-00-820-001).



EFF :
ALL
 27-21-00



AIJ




Page 515
Feb 01/11

R
R

Rudder Mechanical Control


Figure 503/TASK 27-21-00-991-005



EFF :
ALL
 27-21-00



AIJ




Page 516
Feb 01/07

R
R

Rudder Mechanical Control


Figure 504/TASK 27-21-00-991-012



EFF :
ALL
 27-21-00



AIJ




Page 517
Feb 01/07

(5) Adjust the yaw damper (Ref. TASK 27-26-00-820-001).


R

(6) Install the PIN-RIGGING (98D27207546000) or TBD (98D27207516000) (39)


on the output bellcrank of the lower servocontrol (21).
You must install and remove the rigging pin (39) easily.
If not, do these operations :
(a) Cut and remove the lockwire from the nuts of the rod (23).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (23) until you can install and
remove the rigging pin (39) freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with MISCELLANEOUS (Material No. 19-010).

(7) Install the PIN-RIGGING (98D27207545000) or TBD (98D27207516000) (35)


on the left input lever of the travel limitation unit (27).
You must install and remove the rigging pin (35) easily.
If not, do these operations :
(a) Remove and discard the cotter pins (38).
(b) Loosen the nuts (37).
(c) Remove the retainers (36).
(d) Cut and remove the lockwire from the nuts of the rod (26).
(e) Loosen the nuts.
(f) Release the lockwashers.
(g) Adjust the length of the rod (26) until you can install and
remove the rigging pin (35) freely.
(h) Engage the lockwashers.



EFF :
ALL
 27-21-00



AIJ




Page 518
Feb 01/11

(i) Tighten the nuts.


(j) Make sure that the adjustment is correct after you have tightened
the nuts.
(k) Safety the nuts with MISCELLANEOUS (Material No. 19-010).
(l) Put the rod retainers (36) in position. Tighten the nuts (37).
Install the new cotter pins (38).
R

(8) Install the PIN-RIGGING (98D27207545000) or TBD (98D27207516000) (29)


on the output bellcrank of the centering spring rod (15).
You must install and remove the rigging pin (29) easily.
If not, do these operations :
(a) Remove and discard the cotter pins (38).
(b) Loosen the nuts (37).
(c) Remove the retainers (36).
(d) Cut and remove the lockwire from the nuts of the rod (28).
(e) Loosen the nuts.
(f) Release the lockwashers.
(g) Adjust the length of the rod (28) until you can install and
remove the rigging pin (29) freely.
(h) Engage the lockwashers.
(i) Tighten the nuts.
(j) Make sure that the adjustment is correct after you have tightened
the nuts.
(k) Safety the nuts with MISCELLANEOUS (Material No. 19-010).
(l) Put the rod retainers (36) in position. Tighten the nuts (37).
Install the new cotter pins (38).

(9) Install the PIN-RIGGING (98D27207545000) or TBD (98D27207516000) (34)


on the right input lever of the travel limitation unit (27).
You must install and remove the rigging pin (34) easily.
If not, do these operations :



EFF :
ALL
 27-21-00



AIJ




Page 519
Feb 01/11

(a) Cut and remove the lockwire from the nuts of the rod (16).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (16) until you can install and
remove the rigging pin (34) freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with MISCELLANEOUS (Material No. 19-010).
(10) Disconnect the centering spring rod (15) as follows:
(a) Remove the cotter pin (30) and discard it.
(b) Remove the nut (31) and the washer (32).
(c) Remove the bolt (33) and disconnect the centering spring rod
(15).
Subtask 27-21-00-820-059
D. Adjustment of the Rudder Neutral Position
(1) Adjust the rudder neutral position (Ref. TASK 27-24-00-820-001).
Subtask 27-21-00-710-054
E. Test
(Ref. Fig. 505/TASK 27-21-00-991-003)
(Ref. Fig. 502/TASK 27-21-00-991-004)
(Ref. Fig. 503/TASK 27-21-00-991-005)



EFF :
ALL
 27-21-00


R 
AIJ




Page 520
Feb 01/11

R
R

Rudder Mechanical Control


Figure 505/TASK 27-21-00-991-003



EFF :
ALL
 27-21-00



AIJ




Page 521
Feb 01/07

(Ref. Fig. 504/TASK 27-21-00-991-012)


(1) Preparation for the Test.
(a) Remove the rigging pins (51):
1
_

From the connection relay of the CAPT rudder pedals (60).

2
_

From the connection relay of the F/O rudder pedals (52).

3
_

From the tension regulator (57).

(b) Remove the rigging pin (42) from the cable quadrant (24).
(c) Remove the rigging pin (39) from the output bellcrank of the
servocontrol (21).
(d) Remove the rigging pins (34) and (35) from the input levers of
the travel limitation unit (27).
(e) Remove the rigging pin (40) from the mixer (41) of the artificial
feel unit.
(f) Remove the rigging pin (29) from the output bellcrank of the
centering spring-rod (15).
(2) Do the operational test of the rudder mechanical control (Ref. TASK
27-24-00-710-001).
5. Close-up
________
Subtask 27-21-00-942-068
A. Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-21-00-410-059
B. Close Access
(1) Close the access doors 811, 312AR, 325BL, 325BR, 325CR, 325CL, 325DL,
325DR, 325ER, 325EL.
(2) Install the access panel 211GF (Ref. TASK 53-12-11-400-001).
(3) Install the protective cover on the battery power center 105VU.



EFF :
ALL
 27-21-00



AIJ




Page 522
Feb 01/07

(4) Tighten the two screws.


(5) Close the access door 822.
(6) Remove the access platform(s).
Subtask 27-21-00-860-053
C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-21-00


R 
AIJ




Page 523
Feb 01/07

TASK 27-21-00-720-002
Functional Test of the Rudder Mechanical Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
TR31-101
TR60-1
98A27308005000

1
1
1
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
PROTRACTOR - CONTROL SURFACE
RIGMASTER SYSTEM-FLIGHT CONTROLS
PROTRACTOR-CONTROL SURFACE DEFLECTION



EFF :
ALL
 27-21-00



AIJ




Page 524
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-32-00-860-001
31-60-00-860-001
31-60-00-860-002
34-10-00-860-004
34-10-00-860-005
27-21-00-991-006
27-21-00-991-027

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
Menu Page
EIS Start Procedure
EIS Stop Procedure
IR Alignment Procedure
ADIRS Stop Procedure
Fig. 506
Fig. 507

3. __________
Job Set-up
Subtask 27-21-00-010-053
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
zone 325.
(2) Open the access doors 325ER, 325EL, 325DR, 325DL.
(Ref. Fig. 506/TASK 27-21-00-991-006)



EFF :
ALL
 27-21-00



AIJ




Page 525
Feb 01/11

R
R

Position of the Servocontrol


Figure 506/TASK 27-21-00-991-006



EFF :
ALL
 27-21-00



AIJ




Page 526
Feb 01/07

Subtask 27-21-00-480-051
B. Installation of the tool.
R

(1) Install the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000),


or RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101) on the rudder and on the vertical surface opposite
the center servocontrol.
NOTE : If these tools are not available, you can measure the distance
____
X to find the rudder travel.
(Ref. Fig. 507/TASK 27-21-00-991-027)
Subtask 27-21-00-860-063
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3) Do the IR alignment procedure for the ADIRU 3 only (Ref. TASK 34-1000-860-004).
NOTE : ADIRU 1 and 2 must be OFF. If ADIRU 1 and 2 are ON, the test
____
will not be successfull.
(4) On the overhead panel 23VU, make sure that:
- the FLT CTL/FAC1, FLT CTL ELAC1, and FLT CTL/SEC1 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off.
(5) On the overhead panel 24VU, make sure that:
- the FLT CTL/FAC2, FLT CTL ELAC2, FLT CTL/SEC2 and FLT CTL/SEC3
pushbutton switches are pushed (on these pushbutton switches, the
FAULT and OFF legends are off.
(6) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(7) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows O.
(8) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).



EFF :
ALL
 27-21-00



AIJ




Page 527
Nov 01/09

R
R

Measurement of the Rudder Travel (Distance X)


Figure 507/TASK 27-21-00-991-027



EFF :
ALL
 27-21-00



AIJ




Page 528
Feb 01/07

Subtask 27-21-00-865-052
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-00-865-055
E. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU ELEC/CSM/G /EV AUTO/SPLY
7XE
C01
4. Procedure
_________
(Ref. Fig. 506/TASK 27-21-00-991-006, 507/TASK 27-21-00-991-027)
Subtask 27-21-00-720-050
A. Functional Test of the Rudder Mechanical Control
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. In the CAPT or F/O seat:
- push the right pedal until it
touches the mechanical stop (the
adjustable stop).

The rudder moves smoothly to the right.


On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly to the right mark,
- the protractor that measures the
rudder travel shows 25 plus or minus
1 (or X is included between 643.5 mm
(25.3346 in.) and 696 mm (27.4015
in.)).



EFF :
ALL
 27-21-00



AIJ




Page 529
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------2. Slowly release the right pedal.
The rudder moves to the neutral
position.
On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves to the neutral position,
- the protractor that measures the
rudder travel shows 0. The maximum
no-return value is 0.25 (X = 6.75 mm
(0.2657 in.)).
NOTE : The no-return value is the sum
____
of the two no-return values of
the travel of the rudder for a
right turn and a left turn.
3. Push the left pedal until it
touches the mechanical stop.

The rudder moves smoothly to the left.


On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly to the left mark.
- the protractor that measures the
rudder travel shows 25 plus or minus
1 (or X is included between 643.5 mm
(25.3346 in.) and 696 mm (27.4015
in.)).

4. Slowly release the left pedal.

The rudder moves to the neutral


position.
On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves to the neutral position,
- the protractor that measures the
rudder travel shows 0. The maximum
no-return value is 0.25 (X = 6.75 mm
(0.2657 in.)).

5. On the center pedestal, on the


MCDU:

On the MCDU:



EFF :
ALL
 27-21-00


R 
AIJ




Page 530
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- Get the SYSTEM REPORT/TEST page
- The SYSTEM REPORT/TEST page comes
(Ref. TASK 31-32-00-860-001).
into view.
- Push the line key adjacent to
the NAV indication.

- The SYSTEM REPORT/TEST NAV page comes


into view.

- Push the line key adjacent to


the ADR3 indication.

- The ADR3 page comes into view.

- Push the line key adjacent to


the OUTPUT TEST indication.

- The ADR3 OUTPUT TEST page comes into


view.

- Push the line key adjacent to


the INTERFACE TEST indication.
- Follow the initial condition
(set AIR DATA selector switch
to CAPT 3).

- The ADR3 INTERFACE TEST 1/2 page


comes into view.

- Push the NEXT PAGE KEY.

- The ADR3 INTERFACE TEST 2/2 page


comes into view.

- Push the line key adjacent to


the START TEST indication.

- On the Captains PFD, the speed scale


moves up and stops at 367.7 KTS.

NOTE : Ignore the RETARD warning.


____
To stop it, push the FADEC
pushbutton switch on the
MAINTENANCE panel 50VU.
- Wait 25 sec. approximately
before you move the pedals.
6. In the CAPT or F/O seat:
- push the right pedal until it
touches the mechanical stop
(adjustable stop).

7. Slowly release the right pedal.

The rudder moves smoothly to the right.


The protractor that measures the rudder
travel shows 3.5 plus or minus 0.3
(or X is included between 86.4 mm
(3.4015 in.) and 102.6 mm (4.0393
in.)).
The rudder moves to the neutral
position.



EFF :
ALL
 27-21-00


R 
AIJ




Page 531
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------The protractor that measures the rudder
travel shows 0.
The maximum no-return value is 0.25 (X
= 6.75 mm (0.2657 in.)).
8. Push the left pedal until it
touches the mechanical stop.

The rudder moves smoothly to the left.


The protractor that measures the rudder
travel shows 3.5 plus or minus 0.3
(or X is included between 86.4 mm
(3.4015 in.) and 102.6 mm (4.0393
in.)).

9. Slowly release the left pedal.

The rudder moves to the neutral


position.
The protractor that measures the rudder
travel shows 0.
The maximum no-return value is 0.25 (X
= 6.75 mm (0.2657 in.)).

10. On the center pedestal, on the


MCDU:
- Push the line key adjacent to
the RETURN indication.
- Push the MCDU MENU mode key.

On the MCDU:
- The MCDU MENU page comes into view.

5. Close-up
________
Subtask 27-21-00-080-051
R

A. Remove the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000), or


RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101).
Subtask 27-21-00-942-056
B. Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-21-00



AIJ




Page 532
Nov 01/09

Subtask 27-21-00-865-056
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
7XE
Subtask 27-21-00-410-053
D. Close Access
(1) Close the access doors 325ER, 325DR, 325EL, 325DL.
(2) Remove the access platform(s).
Subtask 27-21-00-860-064
E. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-21-00


R 
AIJ




Page 533
Feb 01/07

TASK 27-21-00-720-003
Functional Test of the Rudder Mechanical Control after Replacement of the
Rudder Hinge-Arm Fittings
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
This test is only applicable after replacement of the rudder hinge-arm
fittings
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
TR31-101
TR60-1
98A27308005000

1
1
1
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
PROTRACTOR - CONTROL SURFACE
RIGMASTER SYSTEM-FLIGHT CONTROLS
PROTRACTOR-CONTROL SURFACE DEFLECTION



EFF :
ALL
 27-21-00



AIJ




Page 534
Nov 01/09

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

24-41-00-861-002

3. __________
Job Set-up

Subtask 27-21-00-010-067

24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
34-10-00-860-004
34-10-00-860-005
55-33-13-000-001
55-33-13-400-001
27-21-00-991-006
27-21-00-991-027

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
IR Alignment Procedure
ADIRS Stop Procedure
Removal of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Installation of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 506
Fig. 507

A. Get Access

R
R

(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the
zone 325.

R
R
R

(2) Open the trailing edge access-panels 325ER, 325EL, 325DR, 325DL
(Ref. TASK 55-33-13-000-001).
(Ref. Fig. 506/TASK 27-21-00-991-006)



EFF :
ALL
 27-21-00



AIJ




Page 535
Aug 01/07

Subtask 27-21-00-480-053
B. Installation of the Tool
R

(1) Install the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000),


or RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101) on the rudder and on the vertical surface opposite
the center servocontrol.
NOTE : If these tools are not available, you can measure the distance
____
X to find the rudder travel.
(Ref. Fig. 507/TASK 27-21-00-991-027)
Subtask 27-21-00-860-072
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3) Do the IR alignment procedure for the ADIRU 3 only (Ref. TASK 34-1000-860-004).
NOTE : The ADIRUs 1 and 2 must be OFF. If the ADIRU 1 and 2 are ON,
____
the test will not give satisfactory results.
(4) On the overhead panel 23VU, make sure that:
- the FAC1, ELAC1 and SEC1 pushbutton switches are pushed (the FAULT
and OFF legends are off).
(5) On the overhead panel 24VU, make sure that:
- the FAC2, ELAC2, SEC2 and SEC3 pushbutton switches are pushed (the
FAULT and OFF legends are off).
(6) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(7) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows O.
(8) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).



EFF :
ALL
 27-21-00



AIJ




Page 536
Nov 01/09

Subtask 27-21-00-865-057
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-00-865-058
E. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU ELEC/CSM/G /EV AUTO/SPLY
7XE
C01
4. Procedure
_________
Subtask 27-21-00-720-051
A. Functional Test of the Rudder Mechanical Control
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. In the CAPT or F/O seat:
- push the right pedal until it
touches the mechanical
(adjustable) stop.

The rudder moves smoothly to the right.


On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly to the right mark,
- the protractor that measures the
rudder travel shows 25 deg. plus or
minus 1 deg. (or X is between 643.5
mm (25.3346 in.) and 696 mm (27.4015
in.)).

2. Slowly release the right pedal.

The rudder moves to the neutral


position.



EFF :
ALL
 27-21-00



AIJ




Page 537
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves to the neutral position,
- the protractor that measures the
rudder travel shows 0 deg.. The
maximum no-return value is 0.25 deg.
(X = 6.75 mm (0.2657 in.)).
NOTE : The no-return value is the sum
____
of the two no-return values of
the travel of the rudder for a
right turn and a left turn.
3. Push the left pedal until it
touches the mechanical stop.

The rudder moves smoothly to the left.


On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly to the left mark.
- the protractor that measures the
rudder travel shows 25 deg. plus or
minus 1 deg. (or X is between 643.5
mm (25.3346 in.) and 696 mm (27.4015
in.)).

4. Slowly release the left pedal.

The rudder moves to the neutral


position.
On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves to the neutral position,
- the protractor that measures the
rudder travel shows 0 deg.. The
maximum no-return value is 0.25 deg.
(X = 6.75 mm (0.2657 in.)).



EFF :
ALL
 27-21-00


R 
AIJ




Page 538
Feb 01/11

5. Close-up
________
Subtask 27-21-00-080-053
R

A. Remove the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000), or


RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101).
Subtask 27-21-00-942-070
B. Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-21-00-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU ELEC/CSM/G /EV AUTO/SPLY
7XE
C01
Subtask 27-21-00-410-062
D. Close Access
(1) Close the trailing edge access-panels 325ER, 325DR, 325EL, 325DL
(Ref. TASK 55-33-13-400-001).
(2) Remove the access platform(s).
Subtask 27-21-00-860-073
E. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).
(2) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-21-00



AIJ




Page 539
Nov 01/09

TASK 27-21-00-820-002
Adjustment of the Rudder Control-Cables Length
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98A27901002000
98D27203500000
98D27207516000
98D27207547000

1
1
1
1
1
1

mirror
tensiometer
thermometer
warning notices
ACCESS PLATFORM 2M (6 FT)
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
PIN,RIGGING-RUDDER CONTROL
BRACKET,TENSION REGULATOR-RUDDER CONTROL
TBD
PIN-RIGGING



EFF :
ALL
 27-21-00



AIJ




Page 540
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire corrosion resistant steel dia 0.6 mm (0.02


in.)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------8

locking clips

27-21-01 11B-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
24-41-00-861-002
24-41-00-862-002
27-21-00-820-004
27-21-00-840-001
27-24-00-710-001
29-10-00-863-003
29-10-00-864-003
52-41-00-410-002
53-12-11-000-001
53-12-11-400-001
53-32-12-000-002
53-32-12-400-002
27-21-45-000-001
27-21-45-400-001

Pre-conditioning through the LP Ground Connection


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Shortening of the Rudder Control Cable
Removal/Installation of the control rod on the rudder
mechanical control
Operational Test of the Rudder Hydraulic Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Close the Avionics Compartment Doors after Access
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Installation of the Cockpit Floor Panels from FR1
thru FR12
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Removal of the Cable Tension Regulator Assy (for
corrective action)
Installation of the Cable Tension Regulator Assy (for
corrective action)



EFF :
ALL
 27-21-00


R 
AIJ




Page 541
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-61-000-001
27-21-61-400-001
27-21-00-991-008
27-21-00-991-009

Removal of the Rudder Control Cables (for corrective


action)
Installation of the Rudder Control Cables (for
corrective action)
Fig. 508
Fig. 509

3. __________
Job Set-up
CAUTION : DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS
_______
CAN CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN
POSITION ON THE RUDDER CONTROL.
Subtask 27-21-00-010-055
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
access door 312AR.
(2) Open the access door 312AR.
(3) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 811.
(4) Open the access door 811.
(5) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 812.
(6) Open the access door 812.
(7) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 824.
(8) Open the access door 824.
(9) Put an ACCESS PLATFORM 2M (6 FT) in position at the cargo compartment
door 825.
(10) Open the cargo compartment door 825.
(11) Put an ACCESS PLATFORM 2M (6 FT) in position at the cargo compartment
door 826.
(12) Open the cargo compartment door 826.



EFF :
ALL
 27-21-00


R 
AIJ




Page 542
Aug 01/07

(13) Remove the floor panels 211GF, 211KF, 241BF, 241FF (Ref. TASK 53-1211-000-001) (Ref. TASK 53-32-12-000-002).
Subtask 27-21-00-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(2) Make sure that the air conditionning does not operate (Ref. TASK 1233-21-618-001).
(3) Make sure that there is no neon light on, near the cable, in the
cable routing area.
(4) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(5) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(6) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(7) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(8) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (the OFF legend is off).
(9) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (the OFF legend is off).
(10) Operate the rudder pedals fully more than ten times and put them in
the zero position.
(11) Put warning notices in position on the rudder pedals (CAPT and F/0)
to tell persons not to operate them.
R

(12) Install the PIN-RIGGING (98D27207547000) or TBD (98D27207516000) (6)


on the cable quadrant (5).



EFF :
ALL
 27-21-00



AIJ




Page 543
Feb 01/11

(13) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).


(14) De-energize the aircraft electrical cicuits (Ref. TASK 24-41-00-862002).
(15) Remove the control rod (7) between the mixer and the cable quadrant
(5) (Ref. TASK 27-21-00-840-001).
(16) Do a check of the dimension 22.9 +2 -2 mm (0.9015 +0.0787 -0.0787
in.) on the cable quadrant (5).
If the dimension is not correct, adjust it as follows:
(a) Remove the lockwire from the nuts (3) and discard it.
(b) Loosen the nuts (3).
(c) Turn the bolts (4) until you get the correct dimension.
(d) Tighten the nuts (3). Do not safety the nuts (3) at this time.
4. Procedure
_________
(Ref. Fig. 508/TASK 27-21-00-991-008, 509/TASK 27-21-00-991-009)
Subtask 27-21-00-820-053
A. Adjustment of the Cable Linkage Assy
(1) Measure the ambient temperature with a thermometer.
(2) Use the adjustment graph to find the position of the index of the
cable tension regulator (1), in relation to the ambient temperature.
R

(3) Install the BRACKET,TENSION REGULATOR-RUDDER CONTROL (98D27203500000)


(10) on the mark of the flange of the cable tension regulator (1)
(access door 811).
NOTE : This tool is used to align the mark on the cable tension
____
regulator with the related graduation on the fixed scale.
(4) Bend the two cables to the same value and release them quickly. When
you release the cables, make sure that the two quadrants of the
tension regulator move easily (it must not be caught).
(5) Remove the locking clips (8) from the turnbuckles (9).



EFF :
ALL
 27-21-00



AIJ




Page 544
Aug 01/07

(6) Turn the 2 turnbuckles (9) by the same value to adjust the length of
the cable loop so that:
(a) Read the value on the fixed scale with a mirror and check that
the position of the index of the tension regulator (1) agrees
with the values found on the graph.
(b) You can install the locking clips (8) on the turnbuckles (9).
R
R

(c) You can easily install and remove the PIN,RIGGING-RUDDER CONTROL
(98A27901002000) (2) on the input lever of the cable tension
regulator (1).

(7) If you cannot install the PIN,RIGGING-RUDDER CONTROL (98A27901002000)


easily, adjust the bolt (4):
(a) If necessary, remove the lockwire from the nuts (3) and discard
it.
(b) Loosen the nuts (3) from the cable quadrant (5).
(c) Turn the bolts (4) on the cable quadrant (5) so that:
- The position of the index of the tension regulator (1) agrees
with the values found on the graph.
- You can easily install and remove the PIN,RIGGING-RUDDER
CONTROL (98A27901002000) (2) on the input lever of the cable
tension regulator (1).

R
R

(d) Do a check of the dimensions 22.9 +2 -2 mm (0.9015 +0.0787 0.0787 in.).


(e) Tighten the nuts (3) on the cable quadrant (5). Do not safety the
nuts (3) at this time.
(8) If you cannot adjust the control cables, do a visual inspection of
the pulleys and the tension regulator.
(a) If they are in good condition:
1
_

Make a mark on each front cable.

2
_

Pull the cables to the rear until the position of the index
agrees with the value found on the graph.

3
_

Keep the cables pulled and make a new mark on each front cable
then release the cables.



EFF :
ALL
 27-21-00



AIJ




Page 545
Aug 01/07

Component Location
Figure 508/TASK 27-21-00-991-008- 12 (SHEET 1)


EFF :
ALL
 27-21-00


R 
AIJ




Page 546
Aug 01/07

Component Location
Figure 508/TASK 27-21-00-991-008- 22 (SHEET 2)


EFF :
ALL
 27-21-00


R 
AIJ




Page 547
Aug 01/07

Adjustment Graph
Figure 509/TASK 27-21-00-991-009



EFF :
ALL
 27-21-00



AIJ




Page 548
Nov 01/09

4
_

Measure the length between two marks of each cable


- if the length is more than 45 mm (1.7716 in.), shorten the
control cables (Ref. TASK 27-21-00-820-004).
- if the length is less than 45 mm (1.7716 in.), replace the
rear control cables (Ref. TASK 27-21-61-000-001) (Ref. TASK
27-21-61-400-001).

(9) Install the locking clips (8) on the turnbuckles (9).


Connect the control rod (7) between the cable quadrant and the mixer
(Ref. TASK 27-21-00-840-001). Make sure that bolts can be installed
easily.
If not, do these operations:
(a) Cut and remove the lockwire from the nuts of the rod (7).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod until you can push the bolts freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct.
(h) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03 in.)
R

(10) Remove the PIN-RIGGING (98D27207547000) or TBD (98D27207516000) (6)


from the cable quadrant (5).
(11) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) from the
tension regulator (1).
(12) With a tensiometer, measure the tension of each cable, in each cargo
compartment, between two static fairleads.
NOTE : The tension value of the two cables must be 22 +4 -4 daN
____
(49.4579 +8.9923 -8.9923 lbf). If the tension value is not
correct, replace the cable tension regulator (1) (Ref. TASK
27-21-45-000-001), (Ref. TASK 27-21-45-400-001).



EFF :
ALL
 27-21-00



AIJ




Page 549
Feb 01/11

Subtask 27-21-00-710-053
B. Test
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(3) Operate the rudder pedals fully more than ten times and put them in
the zero position.
(4) Do an operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).
(5) Install the rigging pin (2) on the input lever of the tension
regulator (1).
(6) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(7) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
(8) Make sure that:
- The calibration value you found on the scale during the adjustment
is still aligned with the index of the tension regulator (1) with a
tolerance of + or - 1/2 graduation.
(9) Make sure that you can easily install the rigging pin (6) on the
cable quadrant (5).
(10) With a tensiometer, measure the tension of the two cables, in each
cargo compartment between two static fairleads.
Repeat this operation twice to valid the measurement.
(11) Make sure that the tension value is 22 +4 -4 daN (49.4579 +8.9923 8.9923 lbf).
(12) Safety the nuts (3) with Lockwire corrosion resistant steel dia 0.6
mm (0.02 in.).
(13) Remove the rigging pins (6) and (2).
R

(14) Remove the BRACKET,TENSION REGULATOR-RUDDER CONTROL (98D27203500000)


(10) from the flange of the cable tension regulator (1).



EFF :
ALL
 27-21-00



AIJ




Page 550
Aug 01/07

5. Close-up
________
Subtask 27-21-00-942-060
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 27-21-00-410-055
B. Close Access
(1) Install the floor panels 211GF, 211KF, 241BF, 241FF (Ref. TASK 53-1211-400-001), (Ref. TASK 53-32-12-400-002).
(2) Close the access doors 312AR, 811, 812, 824, 825, 826 (Ref. TASK 5241-00-410-002).
(3) Remove the access platform(s).
(4) Remove the warning notice(s).



EFF :
ALL
 27-21-00


R 
AIJ




Page 551
Aug 01/07

TASK 27-21-00-820-004
Shortening of the Rudder Control Cable
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Do this procedure when it is no longer possible to adjust the length of the
rudder control cables (turnbuckles on the stops).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98A27901002000
98D27207547000

thermometer
warning notice
access platforms 2.3 m (7 ft. 7 in.)
1 PIN,RIGGING-RUDDER CONTROL
1 PIN-RIGGING



EFF :
ALL
 27-21-00



AIJ




Page 552
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
27-21-00-820-002
27-21-00-991-008
27-21-00-991-009
27-21-00-991-019
27-21-00-991-020

Pre-conditioning through the LP Ground Connection


Adjustment of the Rudder Control-Cables Length
Fig. 508
Fig. 509
Fig. 510
Fig. 511

3. __________
Job Set-up
Subtask 27-21-00-010-064
A. Get Access
(1) Make sure that the access platforms are in position at the cargo
compartment doors 825 and 826.
(2) Make sure that the cargo compartment doors 825 and 826 are open.
(3) In the zone 241, make sure that the floor panels 241FF and 241BF are
removed.
(4) In the zone 131, make sure that the partition panel 131PW is removed.
Subtask 27-21-00-860-067
B. Aircraft Maintenance Configuration
(1) Make sure that the air conditioning system does not operate
(Ref. TASK 12-33-21-618-001).
(2) Make sure that there is no neon light on, near the cable, in the
cable routing zone.
(3) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).



EFF :
ALL
 27-21-00


R 
AIJ




Page 553
May 01/10

(4) Make sure that the rudder trim and the rudder pedals are in the 0
position.
(5) Put a warning notice in position in the cockpit to tell persons not
to operate the rudder pedals and the rudder trim.
R

(6) Make sure that the PIN-RIGGING (98D27207547000) (6) is in position on


the cable quadrant (5).
(7) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) is
in position on the tension regulator (1).
4. Procedure
_________
(Ref. Fig. 508/TASK 27-21-00-991-008, 509/TASK 27-21-00-991-009, 510/TASK
27-21-00-991-019, 511/TASK 27-21-00-991-020)
Subtask 27-21-00-220-052
A. Measurement
(1) Measure the cable zone temperature and the external temperature with
a thermometer. Make sure that the temperature is the same at plus or
minus 2 DEG.C (plus or minus 3.60 DEG.F).
Subtask 27-21-00-820-061
B. Shortening of the Rudder Control Cables
(1) Adjust the two turnbuckles to the dimension C = 30 mm (1.18 in.).
(2) Find the correct value to cut the cables.
NOTE : Cut the two rear cables by the same value.
____
(a) Use the adjustment graph to find the position of the index of the
tension regulator (1) in relation to the ambient temperature.
(b) Put marks on the two cables where the cable routing is straight
and near the structure.
(c) In the fuselage between two static fairleads, pull the two cables
at the same time until the index of the tension regulator is at
the position found on the graph.
NOTE : Pull the cables down to get the necessary force, and
____
measure the cable travel Y along the aircraft axis.



EFF :
ALL
 27-21-00



AIJ




Page 554
May 01/10

Rudder Cable Turnbuckles


Figure 510/TASK 27-21-00-991-019


EFF :
ALL
 27-21-00


R 
AIJ




Page 555
Aug 01/07

Cable Travel Y


Figure 511/TASK 27-21-00-991-020


EFF :
ALL
 27-21-00


R 
AIJ




Page 556
Aug 01/07

(d) Measure with the marks (on the cables and on the structure) the
cable travel Y on each cable to get the necessary cable length.
(e) For each cable side, subtract 45 mm (1.7716 in.) from the value
measured before.
NOTE : 45 mm (1.7716 in.) is the cable penetration into the
____
terminal stud of one turnbuckle.
(f) The value X (to cut the cable) = Y (cable travel) - 45 mm
(1.7716 in.).
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------| Example:
|
|
Measured cable travel Y for each cable
= 110 mm (4.33 in.)
|
|
Cable penetration into the terminal stud
= 45 mm (1.77 in.)
|
|
Value X to cut the cable
= 110 mm - 45 mm = 65 mm
|
|
(4.33 in. - 1.77 in. = 2.55 in.) |
|-----------------------------------------------------------------------------|
|
Cut the two rear cables by 65 mm (2.55 in.)
|
------------------------------------------------------------------------------(3) Use the measured clearance between the turnbuckles and the static
fairleads to cut the rear cable junction by the calculated value.
NOTE : Cut the two rear cables by the same value.
____
(4) Install the new turnbuckles on the cable (Ref. CFM Cable Fabrication
Man).
(5) Do the adjustment of the rudder control-cables length (Ref. TASK 2721-00-820-002).
(6) Make sure that the clearances A between the two turnbuckles and the
fairleads is minimum 25.4 mm (1.00 in.) along the full travel range
of the rudder control.
(7) Make sure that the distance B between the ends of the turnbuckles
in each rudder control cable is minimum 90 mm (3.54 in.) in all the
positions.
(8) Make sure that the turnbuckles are in the adjustment range of 38.2 mm
(1.50 in.).



EFF :
ALL
 27-21-00



AIJ




Page 557
May 01/10

5. Close-up
________
Subtask 27-21-00-860-068
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the special and standard tools and all other items.



EFF :
ALL
 27-21-00



AIJ




Page 558
Aug 01/07

TASK 27-21-00-820-005
Cutting of the Rear Control Cable of the Rudder
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Do this procedure when you install a new rear control cable on the rudder.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98A27901002000
98D27207547000
98D27408650000

thermometer
warning notice
access platforms 2.3 m (7 ft. 7 in.)
1 PIN,RIGGING-RUDDER CONTROL
1 PIN-RIGGING
1 DEVICE-PRE RIGGING,CONTROL CABLE



EFF :
ALL
 27-21-00



AIJ




Page 559
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
27-21-00-991-008
27-21-00-991-018

Pre-conditioning through the LP Ground Connection


Fig. 508
Fig. 512

3. __________
Job Set-up
Subtask 27-21-00-010-065
A. Get Access
(1) Make sure that the access platforms are in position at the cargo
compartment doors 825 and 826.
(2) Make sure that the cargo compartment doors 825 and 826 are open.
(3) In the zone 241, make sure that the floor panels 241FF and 241BF are
removed.
(4) In the zone 131, make sure that the partition panel 131PW is removed.
Subtask 27-21-00-860-069
B. Aircraft Maintenance Configuration
(1) Make sure that the air conditioning system does not operate
(Ref. TASK 12-33-21-618-001).
(2) Make sure that there is no neon light on, near the cable, in the
cable routing zone.
(3) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(4) Make sure that the rudder trim and the rudder pedals are in the 0
position.



EFF :
ALL
 27-21-00


R 
AIJ




Page 560
Nov 01/09

(5) Put a warning notice in position in the cockpit to tell persons not
to operate the rudder pedals and the rudder trim.
R

(6) Make sure that the PIN-RIGGING (98D27207547000) (6) is in position on


the cable quadrant (5).
(7) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) is
in position on the tension regulator (1).
4. Procedure
_________
(Ref. Fig. 508/TASK 27-21-00-991-008, 512/TASK 27-21-00-991-018)
Subtask 27-21-00-820-062
A. Tension of the Cables
(1) Install the DEVICE-PRE RIGGING,CONTROL CABLE (98D27408650000).
(2) Apply a tension of 32 daN (71.9388 lbf) to the cable linkage.
Subtask 27-21-00-220-053
B. Measurement
(1) Measure the cable zone temperature and the external temperature with
a thermometer. Make sure that the temperature is the same at plus or
minus 2 DEG.C (plus or minus 3.60 DEG.F).
Subtask 27-21-00-820-063
C. Cutting of the Rear Control Cable of the Rudder
(1) Measure the distance between FR35 and the rear control cable of the
rudder.
Make a mark on each cable:
- for the right cable: at 933.7 mm (36.7598 in.) plus or minus 2 mm
(0.0787 in.)
- for the left cable: at 383.7 mm (15.1063 in.) plus or minus 2 mm
(0.0787 in.)
(2) Release the tension on the cables.
(3) Remove the DEVICE-PRE RIGGING,CONTROL CABLE (98D27408650000).



EFF :
ALL
 27-21-00



AIJ




Page 561
May 01/10

Rear Rudder Control Cables Length Adjustment


Figure 512/TASK 27-21-00-991-018


EFF :
ALL
 27-21-00



AIJ




Page 562
Aug 01/07

R
R

(4) Use an applicable tool (Ref. CFM Cable Fabrication Man) to cut the
cables at the marks you did before.

R
R

(5) Install the turnbuckles on the cable ends (Ref. CFM Cable Fabrication
Man).



EFF :
ALL
 27-21-00



AIJ




Page 563
Aug 01/08

RUDDER MECHANICAL CONTROL - INSPECTION/CHECK


____________________________________________
TASK 27-21-00-210-001
Visual Inspection of the Universal Joint
1. __________________
Reason for the Job
To make sure that the universal joint connected to the rudder trim actuator
is in the correct condition.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

warning notice
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-21-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Fig. 601

3. __________
Job Set-up
Subtask 27-21-00-010-060
A. Get Access
Not applicable.



EFF :
ALL
 27-21-00



AIJ




Page 601
Feb 01/11

Subtask 27-21-00-860-054
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the maintenance panel 50VU:
(a) Release the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch. The
OFF legend comes on.
(b) Release the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch. The
OFF legend comes on.
(c) Release the HYD/LEAK MEASUREMENT VALVES/B pushbutton switch. The
OFF legend comes on.
(3) Put a warning notice on the HYD section of the panel 50VU to tell
persons not to operate the LEAK MEASUREMENT VALVES pushbutton
switches.
Subtask 27-21-00-010-051
C. Get Access
(1) Open the access door 325BL.
R

(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at zone 325.
4. Procedure
_________
(Ref. Fig. 601/TASK 27-21-00-991-002)
Subtask 27-21-00-210-050
A. Visual Inspection of the Universal Joint
(1) Do the visual check of the universal joint (1) to make sure that
there is no corrosion or cracks on the yokes.
(2) Move the universal joint (1) by hand to make sure that there is no
play on the cross piece and on the yoke bushes.



EFF :
ALL
 27-21-00



AIJ




Page 602
Feb 01/11

R
R

Component Location
Figure 601/TASK 27-21-00-991-002



EFF :
ALL
 27-21-00



AIJ




Page 603
Feb 01/07

5. Close-up
________
Subtask 27-21-00-410-051
A. Close Access
(1) Close the access door 325BL.
(2) Remove the access platform(s).
Subtask 27-21-00-860-055
B. Put the aircraft back to its initial configuration.
(1) On the maintenance panel 50VU:
(a) Push the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch. The OFF
legend goes off.
(b) Push the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch. The OFF
legend goes off.
(c) Push the HYD LEAK MEASUREMENT VALVES/B pushbutton switch. The OFF
legend goes off.
(2) At zone 147, remove the connector from the leak-measurement solenoid
valve (1150GP).
(3) Connect the connector to the dummy connector attached to the aircraft
structure.
(4) Install the blanking cap to the leak-measurement solenoid valve
(1150GP).
(5) Remove the warning notice(s).
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-21-00


R 
AIJ




Page 604
Feb 01/07

TASK 27-21-00-210-002
Detailed Visual Inspection of the Rudder Mechanical Control Cables
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-24-12-200-001
24-42-00-861-001
24-42-00-862-001
R
R
R
R
R
R
R
R

25-54-12-000-001
25-54-12-000-002
25-54-12-400-001
25-54-12-400-002
25-55-11-000-002

Check of the Control Cables


Energize the Ground Service Network from the External
Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Forward Cargo-Compartment Partition
FR34
Removal of the Ceiling Panels in the Forward
Cargo-Compartment
Installation of the Forward Cargo-Compartment
Partition FR34
Installation of the Ceiling Panels in the Forward
Cargo-Compartment
Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59



EFF :
ALL
 27-21-00



AIJ




Page 605
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------25-55-11-400-002
R
R

25-55-12-000-001
25-55-12-000-002

25-55-12-400-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
53-12-11-000-001
53-12-11-400-001
53-12-12-000-001
53-12-12-400-001
53-22-12-000-001
53-22-12-400-001
53-32-12-000-002
53-32-12-400-002
27-21-00-991-007-A
27-21-00-991-015

Installation of the Ceiling Panels in the AFT Cargo


Compartment -FR47/FR59
Removal of the Aft Cargo-Compartment Partition FR65
Removal of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Installation of the Aft Cargo-Compartment Partition
FR65
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Installation of the Cockpit Floor Panels from FR1
thru FR12
Removal of the Cabin Floor Panels from FR12 thru FR24
Installation of the Cabin Floor Panels from FR12 thru
FR24
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 602
Fig. 603

3. __________
Job Set-up
(Ref. Fig. 602/TASK 27-21-00-991-007-A)
Subtask 27-21-00-860-056
A. Aircraft Maintenance Configuration
(1) Energize the ground service network (Ref. TASK 24-42-00-861-001).
(2) Make sure that hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-001), (Ref. TASK 29-10-00-864-002),
(Ref. TASK 29-10-00-864-003).
(3) Put a warning notice on the CAPT and F/O rudder pedals to tell
persons not to operate them.



EFF :
ALL
 27-21-00



AIJ




Page 606
Nov 01/10

R
R

Access Location
Figure 602/TASK 27-21-00-991-007-A



EFF :
ALL
 27-21-00



AIJ




Page 607
Feb 01/08

Subtask 27-21-00-010-054
B. Get Access
(Ref. Fig. 602/TASK 27-21-00-991-007-A)
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in the


zone 132.

(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position in the


zone 154.

(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in the
zone 312.
(4) Open the access doors 312AR, 825, 826.
(5) In the zones 211 and 221, remove the floor panels 211GF, 211KF, 221EF
221LF (Ref. TASK 53-12-11-000-001), (Ref. TASK 53-12-12-000-001).
(6) In the zones 231 and 241, remove the floor panels 231CF, 231WF,
241BF, 241FF, 241KF (Ref. TASK 53-12-12-000-001) (Ref. TASK 53-22-12000-001) (Ref. TASK 53-32-12-000-002).
(7) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-000-002).
(8) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-5412-000-001).
(9) In the zone 151 and 161, remove the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK
25-55-12-000-002).
(10) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK
25-55-12-000-001).
4. Procedure
_________
Subtask 27-21-00-210-051
A. Visual Inspection
(Ref. Fig. 603/TASK 27-21-00-991-015)
(1) Make sure that the fairleads are in the correct condition.
(2) At the FR70, make sure that the pressure seals (3) are correctly
installed and in the correct condition.



EFF :
ALL
 27-21-00



AIJ




Page 608
Feb 01/11

(3) Make sure that the turnbuckles (1) are safetied with the lock clips
(2).
(4) Make sure that the cables are not damaged with no corrosion
(Ref. TASK 20-24-12-200-001).
(5) Make sure that the linkage can move freely and does not touch or rub
against:
- the tubing,
- the structures,
- the electrical routing,
- the adjacent controls.
5. Close-up
________
Subtask 27-21-00-942-058
A. Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-21-00-410-054
B. Close Access
(Ref. Fig. 602/TASK 27-21-00-991-007-A)
(1) In the zones 211 and 221, install the floor panels 211GF, 211KF,
221EF 221LF 231CF (Ref. TASK 53-12-11-400-001), (Ref. TASK 53-12-12400-001).
(2) In the zones 231 and 241, install the floor panels 231WF, 241BF,
241FF, 241KF (Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400002).
(3) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-400-002).
(4) In the zone 131, install the partition panel 131PW (Ref. TASK 25-5412-400-001).
(5) In the zone 151 and 161, install the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-400-002) (Ref. TASK
25-55-12-000-002).
(6) In the zone 161, install the partition panels 161DW, 162DW (Ref. TASK
25-55-12-400-001).
(7) Close the access doors 312AR, 825, 826.
(8) Remove the access platform(s).



EFF :
ALL
 27-21-00


R 
AIJ




Page 609
Feb 01/11

R
R

Rudder Mechanical Control Cables


Figure 603/TASK 27-21-00-991-015- 12 (SHEET 1)



EFF :
ALL
 27-21-00



AIJ




Page 610
Feb 01/07

R
R

Rudder Mechanical Control Cables


Figure 603/TASK 27-21-00-991-015- 22 (SHEET 2)



EFF :
ALL
 27-21-00



AIJ




Page 611
Feb 01/07

Subtask 27-21-00-860-057
C. Put the aircraft back to its initial configuration.
(1) Remove the warning notice(s).
(2) De-energize the ground service network (Ref. TASK 24-42-00-862-001).



EFF :
ALL
 27-21-00


R 
AIJ




Page 612
May 01/08

TASK 27-21-00-220-001
Check of the Tension of the Rudder Mechanical-Control Cables with a Tensiometer
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

tensiometer
warning notices
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE



EFF :
ALL
 27-21-00



AIJ




Page 613
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
R
R
R
R

25-54-12-000-002
25-54-12-400-002
25-55-11-000-002
25-55-11-400-002
27-21-00-820-002
27-21-45-000-001
27-21-45-400-001
29-10-00-863-003
29-10-00-864-003
52-30-00-860-001
52-30-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Ceiling Panels in the Forward
Cargo-Compartment
Installation of the Ceiling Panels in the Forward
Cargo-Compartment
Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
Adjustment of the Rudder Control-Cables Length
Removal of the Cable Tension Regulator Assy
Installation of the Cable Tension Regulator Assy
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up
Subtask 27-21-00-860-058
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Blue hydraulic system
with the electric pump (Ref. TASK 29-10-00-863-003).
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(4) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.



EFF :
ALL
 27-21-00



AIJ




Page 614
May 01/11

(5) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
(6) Put warning notices in position on the rudder pedals, on the
pitch-trim control wheels and on the sidestick controllers (CAPT and
F/O) to tell persons not to operate them.
Subtask 27-21-00-010-056
B. Get Access
(1) Open the FWD and AFT cargo-compartment doors (Ref. TASK 52-30-00-860001).
R

(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(3) Remove the ceiling panel 131BC in the FWD cargo compartment
(Ref. TASK 25-54-12-000-002).
(4) Remove the ceiling panel 151BC in the AFT cargo compartment
(Ref. TASK 25-55-11-000-002).
4. Procedure
_________
Subtask 27-21-00-220-050
A. Check of the Correct Tension of the Rudder Mechanical-Control Cables
(1) Operate the rudder mechanical control five times and put it in the
zero position.
(2) In the cargo compartment, you can see four cables:
- the two cables at right are the THS control cables
- the two cables at left are the rudder control cables.
(3) Make sure that the tension regulator device is not seized and not on
a stop.
- Bend the two cables at left by the same value and release them
quickly. When you release the cables, make sure that the tension
regulator quadrants move easily (no seizing).
(4) With a tensiometer, measure the tension of each cable, in each cargo
compartment, between two static fairleads.
Repeat this operation twice to valid the measurement.
NOTE : The tension value of each cable is 49.45 +9 -9 lbf (22 +4 -4
____
daN).



EFF :
ALL
 27-21-00



AIJ




Page 615
Feb 01/11

(5) If the result of the check is not correct, adjust the cables
(Ref. TASK 27-21-00-820-002), then replace the tension regulator
(Ref. TASK 27-21-45-000-001), (Ref. TASK 27-21-45-400-001) if
necessary.
(6) Check the tension of the cables.
5. Close-up
________
Subtask 27-21-00-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panel 131BC in the FWD cargo compartment
(Ref. TASK 25-54-12-400-002).
(3) Install the ceiling panel 151BC in the AFT cargo compartment
(Ref. TASK 25-55-11-400-002).
(4) Remove the access platform(s).
(5) Close cargo compartment doors (Ref. TASK 52-30-00-860-002).
Subtask 27-21-00-860-059
B. Put the aircraft back to its initial configuration.
(1) Remove the warning notice(s).
(2) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(3) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.
(4) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(5) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-21-00


R 
AIJ




Page 616
Feb 01/07

TASK 27-21-00-220-002
Check of the Rudder Cable Tension-Regulator (Pointer in the Limits)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272145-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
No specific
98A27901002000
98D27203500000

1
1
1
1

mirror
thermometer
warning notice
ACCESS PLATFORM 2M (6 FT)
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
PIN,RIGGING-RUDDER CONTROL
BRACKET,TENSION REGULATOR-RUDDER CONTROL



EFF :
ALL
 27-21-00



AIJ




Page 617
Nov 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
52-41-00-410-002
27-21-00-820-002
R
R

27-21-00-991-010
27-21-00-991-011

Pre-conditioning through the LP Ground Connection


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Close the Avionics Compartment Doors after Access
Adjustment of the Rudder Control-Cables Length (for
corrective action)
Fig. 604
Fig. 605

3. __________
Job Set-up
CAUTION : DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS
_______
CAN CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN
POSITION ON THE RUDDER CONTROL.
Subtask 27-21-00-010-057
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
access door 312AR.
(2) Open the access doors 312AR.
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 811.
(4) Open the access door 811 (Ref. TASK 52-41-00-410-002).
(5) Put the ACCESS PLATFORM 2M (6 FT)in position at the access door 812.
(6) Open the access door 812.
(7) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 824.
(8) Open the access door 824.



EFF :
ALL
 27-21-00



AIJ




Page 618
Feb 01/07

(9) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 825.
(10) Open the access door 825.
(11) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 826.
(12) Open the access door 826.
Subtask 27-21-00-862-057
B. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(2) Make sure that the air conditionning is de-energized (Ref. TASK 1233-21-618-001).
(3) The cable routing area must not be lighten by neon located close the
cable itself.
(4) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(5) The ambiant temperature must be within the range of 0 deg.C (32.00
deg.F), 40 deg.C (104.00 deg.F).
4. Procedure
_________
R

(Ref. Fig. 604/TASK 27-21-00-991-010, 605/TASK 27-21-00-991-011)


Subtask 27-21-00-220-051
A. Check of the Rudder Cable Tension-Regulator (Pointer in the Limits)
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Blue hydraulic system
with the electric pump (Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-21-00



AIJ




Page 619
Feb 01/07

R
R

Tension Regulator
Figure 604/TASK 27-21-00-991-010



EFF :
ALL
 27-21-00



AIJ




Page 620
Feb 01/07

Adjustment Graph
Figure 605/TASK 27-21-00-991-011



EFF :
ALL
 27-21-00



AIJ




Page 621
Nov 01/09

(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(4) Operate the pedals more than ten times
(5) Put warning notice in position on the rudder pedals (CAPT and F/O) to
tell persons not to operate them.
(6) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (3) on the
input lever of the tension regulator (1).
R
R

(7) Depressurize the Blue hydraulic system


(Ref. TASK 29-10-00-864-003).

R
R

(8) De-energize the aircraft electrical circuits


(Ref. TASK 24-41-00-862-002).

(9) Bend the two cables by the same value and release them quickly. When
you release the cables, make sure that the two quadrants of the
tension regulator (1) move easily (it must not be caught).

(10) Measure the ambient temperature with a thermometer.

(11) Use the adjustment graph to find the position of the index in
relation to the measured ambient temperature.
(Ref. Fig. 605/TASK 27-21-00-991-011)

(12) Install the BRACKET,TENSION REGULATOR-RUDDER CONTROL (98D27203500000)


(4) on the mark of the flange of the cable tension regulator (1),
through the access door 811.

(13) With a mirror, make sure that the value found in the graph agrees
with the position of the index with a tolerance of + or - 1/2
graduation.

(14) If the result of the check is not correct, adjust the cable length
(Ref. TASK 27-21-00-820-002).



EFF :
ALL
 27-21-00



AIJ




Page 622
Aug 01/09

5. Close-up
________
Subtask 27-21-00-860-060
A. Put the aircraft back to its initial configuration.
(1) Remove the BRACKET,TENSION REGULATOR-RUDDER CONTROL (98D27203500000)
(4).
(2) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (3) from the
input lever of the tension regulator (1).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the warning notice(s).
Subtask 27-21-00-410-057
B. Close Access
(1) Close the access doors 312AR, 811, 812, 824, 825, 826 (Ref. TASK 5241-00-410-002).
(2) Remove the access platform(s).



EFF :
ALL
 27-21-00


R 
AIJ




Page 623
Feb 01/11

TASK 27-21-00-210-003
Detailed Visual Inspection of the Rudder Mechanical Control-Linkage in the
Vertical Stabilizer
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-07
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-00-991-013

Fig. 606

3. __________
Job Set-up
Subtask 27-21-00-941-059
A. Put the warning notices in position to tell persons not to pressurize the
hydraulic systems.
Subtask 27-21-00-010-058
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at zone
325.
(2) Open the access doors 325BL, 325CL, 325DL, 325EL.



EFF :
ALL
 27-21-00



AIJ




Page 624
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 606/TASK 27-21-00-991-013)


Subtask 27-21-00-210-054
A. Visual inspection
(1) Make sure that the rods below are not bent or disconnected:
- the rod (6) which connects the upper bellcrank (3) to the centering
spring rod (1),
- the rod (2) which connects the centering spring rod (1) to the
travel limitation unit (5),
- the rod (4) which connects the upper bellcrank (3) to the travel
limitation unit (5),
- the centering spring rod (1).
(2) Make sure that their attachment bolts have locknuts and that the
safety pins are correctly installed.
(3) Make sure that there is no corrosion on the control linkage
components.
5. Close-up
________
Subtask 27-21-00-410-058
A. Close Access
(1) Close the access doors 325BL, 325CL, 325DL, 325EL.
(2) Remove the access platform(s).
Subtask 27-21-00-942-066
B. Remove the warning notice(s).



EFF :
ALL
 27-21-00



AIJ




Page 625
Feb 01/07

R
R

Component Location
Figure 606/TASK 27-21-00-991-013



EFF :
ALL
 27-21-00



AIJ




Page 626
Feb 01/07

TASK 27-21-00-220-004
Detailed Inspection of the Rudder Servocontrol Actuating Spring-Rod and Rudder
Servocontrol Feedback-Rod Attachments
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-11
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27207547000

circuit breaker(s) safety clip(s)


warning notices
access platform 11.0 m (36 ft. 1 in.)
1 PIN-RIGGING



EFF :
ALL
 27-21-00



AIJ




Page 627
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
R
R
R
R
R
R

55-33-13-010-002
55-33-13-410-002
27-21-00-991-028
27-21-00-991-029

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 607
Fig. 608

3. __________
Job Set-up
Subtask 27-21-00-860-074
A. Aircraft Maintenance Configuration
(1) Put the rudder pedals in the neutral position.
(2) Make sure that the rudder trim control is set to zero .
(3) Put warning notices in position in the cockpit to tell persons not to
operate the flight controls.
Subtask 27-21-00-865-060
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-00



AIJ




Page 628
Nov 01/10

Subtask 27-21-00-860-075
C. Safety Precautions
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Put warning notices in position in the cockpit to tell persons not to
pressurize the hydraulic systems.
Subtask 27-21-00-010-068
D. Get Access
(1) Put the access platform in position at zone 310.
(2) Open the access door 312AR.
Subtask 27-21-00-480-054
E. Installation of the Rigging Pin
(1) Put the PIN-RIGGING (98D27207547000) (1) in the rudder cable
quadrant.
(Ref. Fig. 607/TASK 27-21-00-991-028)
R

Subtask 27-21-00-010-069-A

F. Get Access

R
R

(1) Open the access panels 325DR, 325CR at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-010-002).
4. Procedure
_________
(Ref. Fig. 608/TASK 27-21-00-991-029)
Subtask 27-21-00-220-060
A. Inspection of the Rudder Servocontrol Actuating Spring-Rod and Rudder
Servocontrol Feedback-Rod Attachments
NOTE : It is not necessary to remove the protective material during the
____
detailed inspection.



EFF :
ALL
 27-21-00



AIJ




Page 629
May 01/11

R
R

Location of the Rigging Pin


Figure 607/TASK 27-21-00-991-028



EFF :
ALL
 27-21-00



AIJ




Page 630
May 01/08

R
R

Spring rod - Servocontrol feedback rod


Figure 608/TASK 27-21-00-991-029



EFF :
ALL
 27-21-00



AIJ




Page 631
May 01/08

(1) Make sure that the spring rods, related bellcrank (1) and input lever
attachments (2) are in the correct condition (no cracks, no damage
that you can see (also on the bearings)).
(2) Make sure that the related bolts and nuts (3) and (4) are correctly
tightened and safetied.
(3) Make sure that the feedback rod attachments (5) and (6) of the
servocontrol are in the correct condition (no cracks, no damage that
you can see (also on the bearings)).
(4) Make sure that the related bolts and nuts (7) and (8) are correctly
tightened and safetied.
5. Close-up
________
R

Subtask 27-21-00-860-076-A

A. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R

(2) Close the access panels 325DR, 325CR at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-410-002).
Subtask 27-21-00-480-055
B. Removal of the Rigging Pin
(1) Remove the PIN-RIGGING (98D27207547000) (1) from the rudder cable
quadrant.
(Ref. Fig. 607/TASK 27-21-00-991-028)
Subtask 27-21-00-865-061
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-00



AIJ




Page 632
May 01/11

Subtask 27-21-00-410-063
D. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
R
(3) Remove the access platform(s).
(4) Remove the warning notices.



EFF :
ALL
 27-21-00



AIJ




Page 633
Nov 01/10

RUDDER - REMOVAL/INSTALLATION
_____________________________
TASK 27-21-41-000-001
Removal of the Rudder
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
No specific
No specific
SL90-314-3750
SL90-314-5625
SL90-315-3750
SL90-322-5625
SL90-350-7500
98A55308440000
98A55308741001
98D27207545000
98D27207547000
98D27207548000

1
1
1
1
1
1
1
1
1
1
1
1
1
1

circuit breaker(s) safety clip(s)


rubber mat
rudder support
warning notices
ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
CRANE 100KG (220 LB)
MAT - RUBBER
TIE WRAP
TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454
TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454
WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454
WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454
TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA 5454
SLING-UNIVERSAL,TAIL PLANE
SLING,R I RUDDER
PIN-RIGGING
PIN-RIGGING
PIN-RIGGING



EFF :
ALL
 27-21-41



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

20-22-00-000-001
24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
53-55-12-000-001
55-33-13-010-002
55-42-13-000-001
27-21-41-991-001
27-21-41-991-002
27-21-41-991-003
27-21-41-991-004
27-21-41-991-005
27-21-41-991-006
27-21-41-991-010

Removal of STA-LOK Nuts and Lockwashers


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Removal of the Rudder Fairings 325AL and 325AR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Removal of the Access Panel 326CT at the Rudder
Attach Fitting No. 7
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-41-991-001, 402/TASK 27-21-41-991-002)
Subtask 27-21-41-860-050
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)



EFF :
ALL
 27-21-41



AIJ




Page 402
Aug 01/07

R
R

Panel and Rigging Pin Locations


Figure 401/TASK 27-21-41-991-001



EFF :
ALL
 27-21-41



AIJ




Page 403
Feb 01/07

R
R

Sling Attachment
Figure 402/TASK 27-21-41-991-002



EFF :
ALL
 27-21-41



AIJ




Page 404
Feb 01/07

Subtask 27-21-41-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-41-860-052
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows zero.
(4) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch and the OFF legend comes on.
(5) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch and the OFF legend comes on.
(6) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(7) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-21-41


R 
AIJ




Page 405
Feb 01/07

Subtask 27-21-41-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-41-860-051
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) Put warning notices in position to tell persons not to pressurize the
hydraulic systems.
(3) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
Subtask 27-21-41-010-050
F. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panels 325BL, 325BR, 325CL, 325CR, 325DL and remove
the access panels 325EL, 325ER, 325DR at the trailing edge of the
vertical stabilizer (1) (Ref. TASK 55-33-13-010-002).
(3) Remove the access panel 326CT at the rudder attach fitting No. 7
(Ref. TASK 55-42-13-000-001).
(4) Open the access door 312AR.



EFF :
ALL
 27-21-41



AIJ




Page 406
Feb 01/11

Subtask 27-21-41-480-050
G. Installation of the Rigging Pins and the Lift Sling
CAUTION : BEFORE YOU ATTACH THE RUDDER SLING TO THE HOISTING POINTS,
_______
VISUALLY EXAMINE IT FOR DAMAGE. IF THE RUDDER SLING IS DAMAGED,
DO NOT USE IT. IF YOU LIFT THE RUDDER WITH A DAMAGED RUDDER
SLING, DAMAGE TO THE RUDDER CAN OCCUR.
CAUTION : MAKE SURE THAT THE HOISTING SLING MOVES SMOOTHLY. IF THE SLING
_______
MOVES SUDDENLY IN THE LONGITUDINAL DIRECTION, TENSION AT THE
ATTACHMENT BOLTS AND LUG CAN CAUSE DAMAGE TO THE RUDDER.
(1) Install the rigging pins as follows:
(Ref. Fig. 401/TASK 27-21-41-991-001)
(a) Install the PIN-RIGGING (98D27207548000) (7) in the differential
lever (4) at RIB4.
(b) Install the PIN-RIGGING (98D27207545000) (6) in the travel
limitation unit (3) at RIB7.
(c) Install the PIN-RIGGING (98D27207547000) (8) in the rudder cable
quadrant (5).
(2) Connect the lift sling as follows:
(Ref. Fig. 402/TASK 27-21-41-991-002)
(a) Remove and discard the self-adhesive discs from the rudder lift
points.
(b) Remove the lift lugs from the rudder (2).
(c) Turn the lift lugs and install them in the opposite direction in
the rudder (2).
R

(d) Put the CRANE 100KG (220 LB) in position at the rudder (2).

R
R

(e) Attach the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) to the CRANE 100KG (220
LB).
(f) Attach the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) to the rudder (2).
(g) Apply sufficient tension to the SLING,R I RUDDER (98A55308741001)
or the SLING-UNIVERSAL,TAIL PLANE (98A55308440000) to tighten its
cables with no vertical movement of the rudder (2).



EFF :
ALL
 27-21-41



AIJ




Page 407
Nov 01/10

Subtask 27-21-41-010-051
H. Get Access
(1) Remove the rudder fairings (Ref. TASK 53-55-12-000-001).
(2) Install a rubber mat between the rudder (2) and the fuselage.
4. Procedure
_________
(Ref. Fig. 403/TASK 27-21-41-991-003, 404/TASK 27-21-41-991-004, 405/TASK
27-21-41-991-005, 406/TASK 27-21-41-991-006, 407/TASK 27-21-41-991-010)
Subtask 27-21-41-020-050
A. Removal of the Rudder
(1) Make sure you identify all the components you remove during the
subsequent procedure with their correct position and location.
(2) Disconnect the push-rod (10) of the transducer 42WV from the bracket
(11) of the rudder (2):
(Ref. Fig. 403/TASK 27-21-41-991-003)
(a) Remove and discard the cotter pin (22).
(b) Remove the nut (21), the washer (20) and the bolt (16).
(c) Disconnect the eye-end of the push-rod (10) from the attachment
bracket (14).
(d) Safety the push-rod (10) and the transducer 42WV (13):
1
_

Use the TIE WRAP to temporarily attach the push-rod (10) to


the hinge arm (12). Do this at a position where the push-rod
(10) and the transducer 42WV (13) are not damaged during the
subsequent procedures.

(e) Remove the sliding bush (17) and the flanged bushes (18) and (19)
from the attachment bracket (14).
(3) Disconnect the hinge No. 1 at RIB2 from the bracket (11) of the
rudder (2):
(Ref. Fig. 403/TASK 27-21-41-991-003)
R
R

(a) Remove the bolt (30) and disconnect the bonding lead (31) from
the attachment bracket (32).



EFF :
ALL
 27-21-41



AIJ




Page 408
May 01/08

R
R

Transducer 42WV Push-Rod and Hinge No. 1 Connections


Figure 403/TASK 27-21-41-991-003



EFF :
ALL
 27-21-41



AIJ




Page 409
Feb 01/07

R
R

Servo Actuator Connections


Figure 404/TASK 27-21-41-991-004



EFF :
ALL
 27-21-41



AIJ




Page 410
Feb 01/07

Hinges No. 6 and No. 7 - Connections


Figure 405/TASK 27-21-41-991-005



EFF :
ALL
 27-21-41



AIJ




Page 411
May 01/08

R
R

Hinges Nos. 2,3,4 and 5 - Connections


Figure 406/TASK 27-21-41-991-006



EFF :
ALL
 27-21-41



AIJ




Page 412
Feb 01/07

R
R

Servo Actuator Connection at the Rudder with Bolt PN D55370020800


Figure 407/TASK 27-21-41-991-010



EFF :
ALL
 27-21-41



AIJ




Page 413
Feb 01/07

(b) Use the TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454 (SL90-3145625) and remove the tab washer (28) and the spring ring (29)
from the slotted nut (27) (Ref. TASK 20-22-00-000-001).
(c) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3225625) and remove the slotted nut (27) from the bolt (23)
(Ref. TASK 20-22-00-000-001). Do not remove the bolt (23) at this
time.
(4) Disconnect the servo actuators 1025GM/2025GM/3025GM (35) from the
brackets (36) of the rudder (2):
(Ref. Fig. 404/TASK 27-21-41-991-004)
(a) Disconnect the servo actuator 1025GM (35) at RIB3 as follows:
1
_

Remove and discard the cotter pin (113).

2
_

Remove the locking cap (112), the nut (111) and the washer
(110).

3
_

Remove the bolt (38).

4
_

Remove the locking plate (39) and the washer (120) from the
bracket (36).

(b) Do the steps in Para 4.A.(4)(a) again and disconnect the servo
actuator 3025GM (35) at RIB4 and 2025GM (35) at RIB5.
(c) Move the piston arms of the servo actuators 1025GM/2025GM/3025GM
(35) away from the brackets (36).
(d) Remove the sealing rings (49) from the piston arm bearings of the
servo actuators 1025GM/2025GM/3025GM (35).
(5) Disconnect the hinge No. 7 at RIB11 from the brackets (51) of the
rudder (2) as follows:
(Ref. Fig. 405/TASK 27-21-41-991-005)
R
R

(a) Remove the bolts (59) and disconnect the bonding leads (60) from
the attachment brackets (61).
(b) Use the TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454 (SL90-3145625) and remove the tab washer (57) and the spring ring (58)
from the slotted nut (56) (Ref. TASK 20-22-00-000-001).



EFF :
ALL
 27-21-41



AIJ




Page 414
May 01/08

(c) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3225625) and remove the slotted nut (56) from the bolt (52)
(Ref. TASK 20-22-00-000-001). Do not remove the bolt (52) at this
time.
(6) Disconnect the hinge No. 6 at RIB9 from the bracket (64) of the
rudder (2) as follows:
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Remove and discard the cotter pin (65) from the bolt (66).
(b) Use the TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454 (SL90-3143750) and remove the tab washer (67) and the spring ring (111)
from the slotted nut (68) (Ref. TASK 20-22-00-000-001).
(c) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3153750) and remove the slotted nut (68) from the bolt (66)
(Ref. TASK 20-22-00-000-001).
(d) Remove the washer (115) from the bolt (66).
(e) Remove the bolt (66) from the connection of the support strut
(69) and the bolt (70).
(f) Disconnect the support strut (69) from the bolt (70).
R
R

(g) Remove the bolt (78) and disconnect the bonding lead (79) from
the attachment bracket (80).
(h) Use the TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA 5454 (SL90350-7500) and remove the tab washer (76) and the spring ring (77)
from the slotted nut (75) (Ref. TASK 20-22-00-000-001).
(i) Remove the slotted nut (75) from the bolt (70).
(j) Remove the bolt (70) and the washer (110) from the connection of
the hinge arm (63) and the bracket (64).
(k) Remove the locking plate (72) from the hinge arm (63).



EFF :
ALL
 27-21-41



AIJ




Page 415
May 01/08

(7) Disconnect the hinges Nos. 2 thru 5 from the brackets (91) of the
rudder (2):
(Ref. Fig. 406/TASK 27-21-41-991-006)
(a) Disconnect the hinge No. 2 at RIB4 of the vertical stabilizer (1)
as follows:
1
_

Remove the bolt (100) and disconnect the bonding lead (99)
from the attachment bracket (101).

2
_

Use the TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA5454 (SL90314-5625) and remove the tab washer (97) and the spring ring
(98) from the slotted nut (96) (Ref. TASK 20-22-00-000-001).

3
_

Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90322-5625) and remove the slotted nut (96) from the bolt (92)
(Ref. TASK 20-22-00-000-001).

4
_

Remove the bolt (92) and the washer (15) from the connection
of the brackets (91) and the hinge arm (90).

5
_

Remove the locking plate (93) from the bracket (91).

(b) Do the steps in Para


at their related rib
- The hinge No. 3 at
- The hinge No. 4 at
- The hinge No. 5 at
R
R

4.A.(7)(a) again and disconnect these hinges


positions of the vertical stabilizer (1):
RIB5
RIB6
RIB7.

(8) Apply a tension to the SLING,R I RUDDER (98A55308741001) or the


SLING-UNIVERSAL,TAIL PLANE (98A55308440000) and remove the load from
the hinges of the rudder (2):
(9) Remove the bolt (52) from the hinge No. 7 at RIB11:
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Remove the bolt (52), the washer (15) and the locking plate (53)
from the connection of the bracket (51) and the hinge arm (50).
(10) Remove the bolt (23) from the hinge No. 1 at RIB2:
(Ref. Fig. 403/TASK 27-21-41-991-003)
(a) Remove the bolt (23), the washer (15) and the locking plate (24)
from the connection of the bracket (11) and the hinge arm (12).



EFF :
ALL
 27-21-41



AIJ




Page 416
May 01/10

(11) Remove the rudder (2) from the vertical stabilizer (1):
(a) Move the rudder (2) aft and down in the 90 degree direction from
the rudder axis until it touches the MAT - RUBBER.
(b) Move the rudder (2) to the left of the aircraft center line.
(c) Move the rudder (2) aft, away from the vertical stabilizer (1)
and lower it onto a rudder support.
R
R

(12) Disconnect the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) from the rudder (2).
(13) Remove the bushes from the hinge locations:
(a) Remove the bushes (25) and (26) from the bracket (11) of the
rudder (2) at the location of the hinge No. 1.
(Ref. Fig. 403/TASK 27-21-41-991-003)
(b) Remove the bushes (94) and (95) from the brackets (91) of the
rudder (2) at the locations of the hinges 2 thru 5.
(Ref. Fig. 406/TASK 27-21-41-991-006)
(c) Remove the bushes (54) and (55) from the brackets (51) of the
rudder (2) at the location of the hinge No. 7.
(Ref. Fig. 405/TASK 27-21-41-991-005)
(d) Remove the bushes (73) and (74) from the hinge arm (63). Do this
at the location of the hinge No. 6 at rib 9 of the vertical
stabilizer (1).
NOTE : The longer bush (74) is installed in the bottom of the
____
hinge arm (63).
(Ref. Fig. 405/TASK 27-21-41-991-005)
(14) Remove the bushes (47) and (48) from the attachment brackets (36) on
the rudder (2).
(Ref. Fig. 404/TASK 27-21-41-991-004)



EFF :
ALL
 27-21-41



AIJ




Page 417
May 01/10

TASK 27-21-41-400-001
Installation of the Rudder
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No
No
R
R
R

specific
specific
specific
specific
specific
specific
specific

No specific
SL90-313-3750
SL90-313-5625
SL90-315-3750
SL90-322-5625
SL90-349-7500
98A55308440000
98A55308741001
98D27207545000
98D27207547000

circuit breaker(s) safety clip(s)


rubber mat
warning notices
access platform 11.0 m (36 ft. 1 in.)
3 CRANE 100KG (220 LB)
1 TIE WRAP
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1
1
1
1
1
1
1
1
1

TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454


TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454
WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454
WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454
TOOL-INSTALLATION,TAB WASHERS STA-LOK NSA5454
SLING-UNIVERSAL,TAIL PLANE
SLING,R I RUDDER
PIN-RIGGING
PIN-RIGGING



EFF :
ALL
 27-21-41



AIJ




Page 418
Feb 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

98D27207548000

1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-002
Material No. 05-005
Material No. 05-052
Material No. 11-026

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
F
ASNA 2879
SELF-ADHES.PVC DISKS FOR HOISTING POINT BLANKING
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------22
65

cotter pin
cotter pin

27-25-04 01 -090
27-21-04 15A-240



EFF :
ALL
 27-21-41



AIJ




Page 419
May 01/10

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-22-55-640-001
20-22-00-400-001
20-28-00-912-004
23-61-41-000-001
23-61-41-400-001
24-41-00-861-002
24-41-00-862-002
27-21-00-720-002
27-25-00-820-001
29-00-00-864-001
51-75-13-916-002
53-55-12-000-001
53-55-12-400-001
55-33-13-010-002
55-33-13-410-002
55-36-48-400-001
55-42-13-400-001
27-21-41-991-001
27-21-41-991-002
27-21-41-991-003
27-21-41-991-004
27-21-41-991-005
27-21-41-991-006

Lubrication of Rudder Hinge Bearing No. 6 with Grease


Mat. No. 04-004
Installation of STA-LOK Nuts and Lockwashers
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Static Discharger
Installation of the Static Discharger
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Functional Test of the Rudder Mechanical Control
Adjustment of the Rudder Position Indicating
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Repair to a layer of Corrosion Preventive Compound
Removal of the Rudder Fairings 325AL and 325AR
Installation of the Rudder Fairings 325AL and 325AR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Installation of the Rudder Support Strut
Installation of the Access Panel 326CT at the Rudder
Attach Fitting No. 7
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406



EFF :
ALL
 27-21-41


R 
AIJ




Page 420
May 01/10

3. __________
Job Set-up
Subtask 27-21-41-861-051
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
Subtask 27-21-41-865-054
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-41-860-053
C. Aircraft Maintenance Configuration
(1) Make sure that the rudder pedals are in the neutral position.
(2) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(4) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(5) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(6) Make sure that the warning notices are in position.
(7) Make sure that the access platform is in position.
(8) Make sure the access door 312AR is open.



EFF :
ALL
 27-21-41


R 
AIJ




Page 421
May 01/10

Subtask 27-21-41-862-051
D. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002)
Subtask 27-21-41-865-052
E. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-41-860-056
F. Aircraft Maintenance Configuration
(1) Make sure that the access panels 325BL, 325BR, 325CL, 325CR, 325DL at
the trailing edge of the vertical stabilizer (1) are opened
(Ref. TASK 55-33-13-010-002).
(2) Make sure that the access panels 325EL, 325ER, 325DR at the trailing
edge of the vertical stabilizer (1) are removed (Ref. TASK 55-33-13010-002).
(3) Make sure that the rudder fairings are removed (Ref. TASK 53-55-12000-001)
(4) Make sure that the rubber mat is in position on the fuselage, below
the rudder location.
(5) Make sure that the rigging pins are installed
locations:
(Ref. Fig. 401/TASK 27-21-41-991-001)
- the PIN-RIGGING (98D27207548000) (7) in the
at RIB4
- the PIN-RIGGING (98D27207545000) (6) in the
(3) at RIB7
- the PIN-RIGGING (98D27207547000) (8) in the
(5).

R
R
R

at their correct
differential lever (4)
travel limitation unit
rudder cable quadrant



EFF :
ALL
 27-21-41



AIJ




Page 422
May 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-21-41-991-002, 403/TASK 27-21-41-991-003, 404/TASK
27-21-41-991-004, 405/TASK 27-21-41-991-005, 406/TASK 27-21-41-991-006)
Subtask 27-21-41-560-050
A. Preparation of a Replacement Component
(Ref. Fig. 402/TASK 27-21-41-991-002)
(1) Replacement of the static dischargers
(a) Remove the static dischargers from the removed rudder (2)
(Ref. TASK 23-61-41-000-001).
(b) Make sure the static dischargers are clean and in the correct
condition.
(c) Install the static dischargers on the replacement rudder (2)
(Ref. TASK 23-61-41-400-001).
(2) Preparation of the hoisting lugs
(a) Remove the hoisting lugs from the replacement rudder (2).
(b) Turn the hoisting lugs and install them in the opposite direction
in the rudder (2).
Subtask 27-21-41-480-051
B. Installation of the lift Sling
CAUTION : BEFORE YOU ATTACH THE RUDDER SLING TO THE HOISTING POINTS,
_______
VISUALLY EXAMINE IT FOR DAMAGE. IF THE RUDDER SLING IS DAMAGED,
DO NOT USE IT. IF YOU LIFT THE RUDDER WITH A DAMAGED RUDDER
SLING, DAMAGE TO THE RUDDER CAN OCCUR.
CAUTION : MAKE SURE THAT THE HOISTING SLING MOVES SMOOTHLY. IF THE SLING
_______
MOVES SUDDENLY IN THE LONGITUDINAL DIRECTION, TENSION AT THE
ATTACHMENT BOLTS AND LUG CAN CAUSE DAMAGE TO THE RUDDER.
(Ref. Fig. 402/TASK 27-21-41-991-002)
R

(1) Put the CRANE 100KG (220 LB) in position at the rudder (2).

(2) Attach the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) to the CRANE 100KG (220 LB).



EFF :
ALL
 27-21-41



AIJ




Page 423
Nov 01/10

R
R

(3) Attach the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) to the rudder (2).

R
R

(4) Apply sufficient tension to the SLING,R I RUDDER (98A55308741001) or


the SLING-UNIVERSAL,TAIL PLANE (98A55308440000) to tighten the cables
with no movement of the rudder (2).
Subtask 27-21-41-910-050
C. Preparation for Installation
(1) Clean the items that follow with the CLEANING AGENTS (Material No.
11-026), and let them dry:
- The attachment hinges
- The bolts
- The sleeves
- The bushes.
(2) Make sure that the items that follow are clean and in the correct
condition:
- The structure
- The paintwork
- The rudder control surface
- The hinge arms
- The bonding straps
- The servo actuators 1025GM/2025GM/3025GM
- The transducer 42WV.
(3) Make sure that the items that follow are in the correct condition:
- The bolts
- The nuts
- The washers
- The sleeves
- The bushes
- The bearings
- The locking components.
(4) Apply the COMMON GREASE (Material No. 04-018) to the bolts, the
sleeves and the bushes. Do not apply the material to the bolt (30).



EFF :
ALL
 27-21-41



AIJ




Page 424
May 01/10

Subtask 27-21-41-420-051
D. Installation of the Rudder
(1) Make sure that during the subsequent procedure, the correctly
identified components are installed at each connection.
(2) Install the bushes (73) and (74) in the hinge arm (63) at the
location of the hinge No. 6 (RIB9 of the vertical stabilizer (1)).
NOTE : The longer bush (74) is installed in the bottom of the hinge
____
arm (63).
(Ref. Fig. 405/TASK 27-21-41-991-005)
R
R

(3) Use the CRANE 100KG (220 LB) to lift the rudder (2) into position aft
of the vertical stabilizer (1).
NOTE : There must be a mechanic at each of the hinges to align:
____
- The axis of the hinge arms
- The servo actuators 1025GM/2025GM/3025GM, with the hinge
fittings on the rudder (2).
(4) Move the rudder (2) to the left of the aircraft center line and then
forward.
(5) Prevent damage to the component interface and the adjacent area.
(a) Make sure that there is sufficient clearance between:
- The push-rod (10) of the transducer 42W
- The piston arms of the servo actuators 1025GM/2025GM/3025GM
(35)
- The vertical stabilizer (1)
- The rudder (2).
(b) Make sure that the edges of the support brackets are not damaged
during the installation of the hinge arms.
(6) Put the hinge arms (12), (50), (63) and (90) in position at the
brackets (11), (51), (64) and (91) of the rudder (2).
(7) Align the bolt holes in the hinge arms (12), (50), (63) and (90) with
their related bolt holes in the brackets (11), (51),(64) and (91).



EFF :
ALL
 27-21-41



AIJ




Page 425
Nov 01/10

(8) Connect the hinge No. 1 at RIB2 to the bracket (11) of the rudder
(2):
(Ref. Fig. 403/TASK 27-21-41-991-003)
(a) Install the bush (25) in the bracket (11).
(b) Install the locking plate (24) at the bracket (11).
(c) Put the washer (15) on the bolt (23).
(d) Install the bolt (23) through the connection of the bracket (11)
and the hinge arm (12).
(e) Install the bush (26) on the bolt (23) until the bush (26) goes
into the bracket (11).
(f) Install the slotted nut (27) on the bolt (23). Do not tighten the
slotted nut (27) at this time.
(g) Put the bonding lead (31) in position and install the bolt (30)
(Ref. TASK 20-28-00-912-004).
(9) Connect the hinge No. 7 at RIB11 to the bracket (51) of the rudder
(2):
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Install the bush (54) in the bracket (51).
(b) Install the locking plate (53) at the bracket (51).
(c) Put the washer (15) on the bolt (52).
(d) Install the bolt (52) through the connection of the bracket (51)
and the hinge arm (50).
(e) Install the bush (55) on the bolt (52) until the bush (55) goes
into the bracket (51).
(f) Install the slotted nut (56) on the bolt (52). Do not tighten the
slotted nut (56) at this time.
(g) Put the bonding leads (60) in position and install the bolts (59)
(Ref. TASK 20-28-00-912-004).



EFF :
ALL
 27-21-41


R 
AIJ




Page 426
May 01/10

(10) Connect the hinge No. 6 at RIB9, to the bracket (64) of the rudder
(2):
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Install the locking plate (72) at the hinge arm (63).
(b) Make sure that the grease nipple (71) is clean and correctly
installed in the end of the bolt (70).
(c) Put the washer (110) on the bolt (70).
(d) Install the bolt (70) through the connection of the hinge arm
(63) and the bracket (64).
(e) Make sure that the attachment lug of the bolt (70) (for the
connection of the support strut (69)), aligns with the axis of
the hinge arm (63).
(f) Install the slotted nut (75) on the bolt (70). Do not tighten the
slotted nut (75) at this time.
(g) Measure the dimension between the top surface of the hinge
bearing (82) and the inner surface of the hinge arm (63). The
dimension between the hinge bearing (82) and the hinge arm (63)
must be 2.75 +0.5 -0.5 mm (0.1082 +0.0196 -0.0196 in.).
(h) If the dimension is not in the limits:
1
_

Adjust the Rudder Support Strut (69) to lift or lower the


rudder (2) (Ref. TASK 55-36-48-400-001). Do this until the
dimension is in the limits.

(i) Put the support strut (69) in position on the attachment lug of
the bolt (70).
(j) Install the bolt (66) through the connection of the support strut
(69) and the bolt (70).
(k) Install the washer (115) and the slotted nut (68) on the bolt
(66). Do not tighten the slotted nut (68) at this time.
(l) Put the bonding lead (79) in position and install the bolt (78)
(Ref. TASK 20-28-00-912-004).



EFF :
ALL
 27-21-41


R 
AIJ




Page 427
May 01/10

(11) Connect the hinges Nos. 2 thru 5 at the brackets (91) of the rudder
(2):
(Ref. Fig. 406/TASK 27-21-41-991-006)
(a) Connect the hinge No. 5 at RIB7 of the vertical stabilizer (1):
1
_

Install the bush (94) in the bracket (91).

2
_

Install the locking plate (93) at the bracket (91).

3
_

Put the washer (15) on the bolt (92).

4
_

Install the bolt (92) through the connection of the bracket


(91) and the hinge arm (90).

5
_

Install the bush (95) on the bolt (92) until the bush (95)
goes into the bracket (91).

6
_

Install the slotted nut (96) on the bolt (92). Do not tighten
the slotted nut (96) at this time.

7
_

Put the bonding lead (99) in position and install the bolt
(100) (Ref. TASK 20-28-00-912-004).

(b) Do the steps in Para 4.D.(11)(a) again for these hinges at their
related rib positions of the vertical stabilizer (1):
- The hinge No. 4 at RIB6
- The hinge No. 3 at RIB5
- The hinge No. 2 at RIB4.
(12) TORQUE and safety the slotted nut (56) at the hinge No. 7 (Ref. TASK
20-22-00-400-001) as follows:
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3225625) and TORQUE the slotted nut (56) to 3.0 m.daN (22.12
lbf.ft).
(b) Use the TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454 (SL90313-5625) and install the tab washer (57) and the spring ring
(58) at the slotted nut (56).



EFF :
ALL
 27-21-41


R 
AIJ




Page 428
May 01/10

(13) TORQUE and safety the slotted nut (27) at the hinge No. 1 (Ref. TASK
20-22-00-400-001) as follows:
(Ref. Fig. 403/TASK 27-21-41-991-003)
(a) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3225625) and TORQUE the slotted nut (27) to 3.0 m.daN (22.12
lbf.ft).
(b) Use the TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454 (SL90313-5625) and install the tab washer (28) and the spring ring
(29) at the slotted nut (27).
(14) TORQUE and safety the slotted nuts (96) at the hinges, Nos. 2 thru 5
(Ref. TASK 20-22-00-400-001) as follows:
(Ref. Fig. 406/TASK 27-21-41-991-006)
(a) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3225625) and TORQUE the slotted nuts (96) to 3.0 m.daN (22.12
lbf.ft).
(b) Use the TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454 (SL90313-5625) and install the tab washers (97) and the spring rings
(98) at the slotted nuts (96).
(15) TORQUE and safety the slotted nut (75) at the hinge No. 6 (Ref. TASK
20-22-00-400-001) as follows:
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) TORQUE the slotted nut (75) to 12.0 m.daN (88.49 lbf.ft).
R
R

(b) Use the TOOL-INSTALLATION,TAB WASHERS STA-LOK NSA5454 (SL90-3497500) and install the tab washer (76) and the spring ring (77) at
the slotted nut (75).
(16) Tighten and safety the slotted nut (68) at the hinge No. 6 (Ref. TASK
20-22-00-400-001) as follows:
(Ref. Fig. 405/TASK 27-21-41-991-005)
(a) Use the WRENCH - NOTCHED, TIGHTENING OF NUTS NSA5454 (SL90-3153750) and tighten the slotted nut (68) until it touches the
washer (115) on the bolt (66).
(b) Use the TOOL - INSTALLATION, TAB WASHERS STA-LOK NSA5454 (SL90313-3750) and install the tab washer (67) and the spring ring
(111).



EFF :
ALL
 27-21-41



AIJ




Page 429
Nov 01/10

(c) Install a new cotter pin (65) through the bolt (66) and safety
it.
(17) Connect the servo actuators 1025GM/2025GM/3025GM (35) to the brackets
(36) of the rudder (2) as follows:
(Ref. Fig. 404/TASK 27-21-41-991-004)
(a) Apply the corrosion preventive material SPECIAL MATERIALS
(Material No. 05-005) to the bolt (38).
(b) Connect the servo actuator 2025GM (35) at RIB5.
1
_

Install the bushes (47) and (48) in the bracket (36).

2
_

Put the sealing rings (49) in position on the piston arm


bearing of the servo actuator (35).

3
_

Put the piston arm of the servo actuator (35) in position in


the bracket (36).

4
_

Align the piston arm bearing of the servo actuator (35) with
the bolt hole in the bracket (36).

5
_

Install the locking plate (39) and the washer (120) at the
bracket (36).

6
_

Install the bolt (38) through the connection of the bracket


(36) and the piston arm of the servo actuator (35).

7
_

Install the washer (110) and the nut (111).

8
_

TORQUE the nut (111) to 8.15 m.daN (60.10 lbf.ft).

9
_

Install the locking cap (112) and the cotter pin (113).

(c) Do the steps in Para 4.D.(17)(b) again and connect the servo
actuators 3025GM (35) at RIB4 and 1025GM (35) at RIB3.
(18) Apply a thin layer of the corrosion preventive material SPECIAL
MATERIALS (Material No. 05-005) (Ref. TASK 51-75-13-916-002) to all
the cadmium-plated steel parts of the rudder hinges which you can
see.



EFF :
ALL
 27-21-41


R 
AIJ




Page 430
May 01/10

(19) Connect the push-rod (10) from the transducer 42WV (13) to the
bracket (11) of the rudder (2):
(Ref. Fig. 403/TASK 27-21-41-991-003)
(a) Install the flanged bushes (18) and (19) in the attachment
bracket (14).
(b) Cut and remove the temporary TIE WRAP, and release the push-rod
(10) from the hinge arm (12).
(c) Put the eye-end of the push-rod (10) in position at the
attachment bracket (14).
(d) Install the sliding bush (17) in the attachment bracket (14).
(e) Install the bolt (16), the washer (20) and the nut (21) at the
connection of the attachment bracket (14) and the push-rod (10).
(f) Safety the nut (21) with a new cotter pin (22).
Subtask 27-21-41-080-050
E. Removal of the Lift Sling and the Rigging Pins
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the lift sling from the rudder as follows:
(Ref. Fig. 402/TASK 27-21-41-991-002)
(a) Release the tension from the SLING,R I RUDDER (98A55308741001) or
the SLING-UNIVERSAL,TAIL PLANE (98A55308440000).
(b) Disconnect the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) from the rudder (2).
(c) Disconnect the SLING,R I RUDDER (98A55308741001) or the SLINGUNIVERSAL,TAIL PLANE (98A55308440000) from the CRANE 100KG (220
LB).

R
R



EFF :
ALL
 27-21-41



AIJ




Page 431
Nov 01/10

(d) Move the CRANE 100KG (220 LB) away from the rudder (2).
(e) Remove the lift lugs from the rudder (2).
(f) Apply the zinc chromate putty SPECIAL MATERIALS (Material No. 05002) to the lift lugs.
(g) Turn the lift lugs and install them in the opposite direction in
the rudder (2).
(h) Make sure that the lift lugs are flush with the skin of the
rudder (2).
(i) Install the self-adhesive PVC disks SPECIAL MATERIALS (Material
No. 05-052) on the lift lugs.
(2) Remove the rigging pins as follows:
(Ref. Fig. 401/TASK 27-21-41-991-001)
(a) Remove the PIN-RIGGING (98D27207547000) (8) from the rudder cable
quadrant (5).
(b) Remove the PIN-RIGGING (98D27207545000) (6) from the travel
limitation unit (3) at RIB7.
(c) Remove the PIN-RIGGING (98D27207548000) (7) from the differential
lever (4) at RIB4.
Subtask 27-21-41-865-051
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CC, 5CC1, 5CC2, 14CC1, 14CC2
Subtask 27-21-41-860-054
G. Preparation for the Test
(1) Remove the rubber mat from between the fuselage and the rudder (2).
(2) Lubricate the hinge bearing (82) of the hinge No. 6
(Ref. Fig. 405/TASK 27-21-41-991-005)
(Ref. TASK 12-22-55-640-001).
(3) Install the rudder fairings (Ref. TASK 53-55-12-400-001).



EFF :
ALL
 27-21-41



AIJ




Page 432
Nov 01/10

(4) Make sure that the travel ranges of:


- the rudder (2)
- the push-rod (10) of the transducer 42WV
- the servo-actuators 1025GM/2025GM/3025GM (35)
are clear of tools and other items.
(5) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002)
(6) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(7) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.
Subtask 27-21-41-820-050
H. Do an adjustment of the rudder position indicating system (Ref. TASK 2725-00-820-001).
Subtask 27-21-41-710-050
J. Do the functional test of the rudder mechanical control (Ref. TASK 27-2100-720-002).
5. Close-up
________
Subtask 27-21-41-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL, 325BR, 325CL, 325CR, 325DL and install
the access panels 325EL, 325ER, 325DR on the trailing edge of the
vertical stabilizer, (Ref. TASK 55-33-13-410-002).
(3) Install the access panel 326CT at the rudder attach fitting No. 7
(Ref. TASK 55-42-13-400-001).
(4) Close the access door 312AR.
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(6) Remove the warning notice(s).



EFF :
ALL
 27-21-41


R 
AIJ




Page 433
May 01/10

(7) Remove the access platform(s).


(8) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-21-41



AIJ




Page 434
May 01/10

RUDDER - INSPECTION/CHECK
_________________________
TASK 27-21-41-200-001
Inspection/Check of the Rudder
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Because the free movement is more than the limits.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notice

R
R

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-41-000-001
27-21-41-400-001
55-36-41-000-001
55-36-41-400-001
55-46-11-000-001
55-46-11-400-001
CMM 55-41-13
27-21-41-991-007
27-21-41-991-009

Removal of the Rudder


Installation of the Rudder
Removal of the Hinge Arm Fittings No. 1 thru No. 7
Installation of the Hinge Arm Fittings No. 1 thru No.
7
Removal of Rudder Hinge Bearing No. 6
Installation of Rudder Hinge Bearing No.6
(for corrective action)
Fig. 601
Fig. 602



EFF :
ALL
 27-21-41



AIJ




Page 601
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-41-991-008

Fig. 603

3. __________
Job Set-up
Subtask 27-21-41-941-055
A. Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-21-41-010-053
B. Remove the rudder (Ref. TASK 27-21-41-000-001).
Subtask 27-21-41-860-055
C. Replacement Information
(1) Do a check of the rudder attachment parts for wear, damage and
corrosion.
(a) If it is necessary to replace the bushes of the rudder hinge
fittings, the actuator attach fittings, or the fork assy:
(Ref. Fig. 601/TASK 27-21-41-991-007)
and
(Ref. Fig. 602/TASK 27-21-41-991-009)
- Refer to the Component Maintenance Manual (Ref. CMM 55-41-13)
for the correct procedure.
(b) If it is necessary to replace the rudder hinge bearing No. 6:
(Ref. Fig. 601/TASK 27-21-41-991-007)
- (Ref. TASK 55-46-11-000-001) and (Ref. TASK 55-46-11-400-001).
(c) If it is necessary to replace rudder hinge arm attach fittings:
(Ref. Fig. 603/TASK 27-21-41-991-008)
- (Ref. TASK 55-36-41-000-001) and (Ref. TASK 55-36-41-400-001).



EFF :
ALL
 27-21-41


R 
AIJ




Page 602
Nov 01/10

R
R

Fits and Clearances of the Rudder Hinge Fittings


Figure 601/TASK 27-21-41-991-007



EFF :
ALL
 27-21-41



AIJ




Page 603
Feb 01/07

R
R

Fits and Clearances of the Actuator Attach Fittings and the Fork Assy
Figure 602/TASK 27-21-41-991-009



EFF :
ALL
 27-21-41



AIJ




Page 604
Feb 01/07

Fits and Clearances of the Bearings of the Rudder Hinge Arm Attach Fittings
Figure 603/TASK 27-21-41-991-008


EFF :
ALL
 27-21-41


R 
AIJ




Page 605
Nov 01/10

4. Procedure
_________
(Ref. Fig. 601/TASK 27-21-41-991-007)
Subtask 27-21-41-220-050
A. Measurement of the Fits and Clearances of the Rudder Hinge Fittings
(Ref. Fig. 601/TASK 27-21-41-991-007)
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 17.987 | 18.000 |
|
| 17.977 |
|
|
| OD 1
|(0.7081) |(0.7086) |
|
|(0.7077) |
|
|
|
|
|
| 0.000 | 0.031 |
|
| 0.066 |
|
|
|
| (0.0000)| (0.0012)|
|
|(0.0025)|
| B
| 18.000 | 18.018 |
|
|
| 18.043 |
|
| ID 2
|(0.7086) |(0.7093) |
|
|
|(0.7103) |
|
------------------------------------------------------------------------------Subtask 27-21-41-220-051
B. Measurement of the Fits and Clearances of the Rudder Hinge Fittings
(Ref. Fig. 601/TASK 27-21-41-991-007)
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 14.262 | 14.275 |
|
| 14.200 |
|
|
| OD 3
|(0.5614) |(0.5620) |
|
|(0.5590) |
|
|
|
|
|
| 0.000 | 0.031 |
|
| 0.158 |
|
|
|
| (0.0000)| (0.0012)|
|
|(0.0062)|
| B
| 14.275 | 14.293 |
|
|
| 14.358 |
|
| ID 1
|(0.5620) |(0.5627) |
|
|
|(0.5652) |
|
------------------------------------------------------------------------------R



EFF :
ALL
 27-21-41



AIJ




Page 606
Nov 01/10

Subtask 27-21-41-220-054
C. Measurement of the Fits and Clearances of the Rudder Hinge Bearing No. 6
(Ref. Fig. 601/TASK 27-21-41-991-007)

R
R
R
R
R
R
R

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.024 | 19.037 |
|
| 19.024 |
|
|
| OD 4
|(0.7489) |(0.7494) |
|
|(0.7489) |
|
|
|
|
|
| 0.001 | 0.026 |
|
| 0.026 |
|
|
|
| (0.0000*| (0.0010*|
|
|(0.0010*|
| C
| 19.038 | 19.050 |
|
|
| 19.050 |
|
| ID 5
|(0.7495) |(0.7500) |
|
|
|(0.7500) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********

R
R

NOTE : No in-service wear limit is permitted between the bolt (4) and the
____
bearing (5).
Subtask 27-21-41-220-052
D. Measurement of the Fits and Clearances of the Actuator Attach Fittings
(Ref. Fig. 602/TASK 27-21-41-991-009)

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 22.984 | 23.000 |
|
| 22.984 |
|
|
| OD 1
|(0.9048) |(0.9055) |
|
|(0.9048) |
|
|
|
|
|
| 0.000 | 0.037 |
|
| 0.037 |
|
|
|
| (0.0000)| (0.0014)|
|
|(0.0014)|
| B
| 23.000 | 23.021 |
|
|
| 23.021 |
|
| ID 2
|(0.9055) |(0.9063) |
|
|
|(0.9063) |
|
-------------------------------------------------------------------------------

R
R

NOTE : No in-service wear limit is permitted between the bush (1) and the
____
bush (2).



EFF :
ALL
 27-21-41



AIJ




Page 607
Nov 01/10

Subtask 27-21-41-220-053
E. Measurement of the Fits and Clearances of the Actuator Attach Fittings
(Ref. Fig. 602/TASK 27-21-41-991-009)

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.024 | 19.037 |
|
| 19.024 |
|
|
| OD 3
|(0.7489) |(0.7494) |
|
|(0.7489) |
|
|
|
|
|
| 0.000 | 0.034 |
|
| 0.034 |
|
|
|
| (0.0000)| (0.0013)|
|
|(0.0013)|
| B
| 19.037 | 19.058 |
|
|
| 19.058 |
|
| ID 1
|(0.7494) |(0.7503) |
|
|
|(0.7503) |
|
-------------------------------------------------------------------------------

R
R

NOTE : No in-service wear limit is permitted between the bolt (3) and the
____
bush (1).
Subtask 27-21-41-220-055
F. Measurement of the Fits and Clearances of the Fork Assy
(Ref. Fig. 602/TASK 27-21-41-991-009)

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 7.986 | 7.995 |
|
| 7.980 |
|
|
| OD 8
|(0.3144) |(0.3147) |
|
|(0.3141) |
|
|
|
|
|
| 0.005 | 0.029 |
|
| 0.040 |
|
|
|
| (0.0001)| (0.0011)|
|
|(0.0015)|
| C
| 8.000 | 8.015 |
|
|
| 8.020 |
|
| ID 9
|(0.3149) |(0.3155) |
|
|
|(0.3157) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-21-41



AIJ




Page 608
Nov 01/10

Subtask 27-21-41-220-056
G. Measurement of the Fits and Clearances of the Fork Assy
(Ref. Fig. 602/TASK 27-21-41-991-009)

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 6.325 | 6.337 |
|
| 6.320 |
|
|
| OD 7
|(0.2490) |(0.2494) |
|
|(0.2488) |
|
|
|
|
|
| 0.013 | 0.061 |
|
| 0.070 |
|
|
|
| (0.0005)| (0.0024)|
|
|(0.0027)|
| C
| 6.350 | 6.386 |
|
|
| 6.390 |
|
| ID 8
|(0.2500) |(0.2514) |
|
|
|(0.2515) |
|
------------------------------------------------------------------------------Subtask 27-21-41-220-057
H. Measurement of the Fits and Clearances of the Fork Assy
(Ref. Fig. 602/TASK 27-21-41-991-009)

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 6.325 | 6.337 |
|
| 6.320 |
|
|
| OD 7
|(0.2490) |(0.2494) |
|
|(0.2488) |
|
|
|
|
|
| 0.013 | 0.061 |
|
| 0.070 |
|
|
|
| (0.0005)| (0.0024)|
|
|(0.0027)|
| C
| 6.350 | 6.386 |
|
|
| 6.390 |
|
| ID 6
|(0.2500) |(0.2514) |
|
|
|(0.2515) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-21-41



AIJ




Page 609
Nov 01/10

Subtask 27-21-41-220-062
J. Measurement of the Inner Dimensions of the Bearings and Bushes of the
Rudder Hinge-Arm Attach-Fittings
(Ref. Fig. 603/TASK 27-21-41-991-008)
(1) Make sure that the inner dimension of the bearings (15), (16) and
(19) is between 14.2748 mm (0.5620 in.) and 14.2875 mm (0.5625 in.).
(2) If the dimension is not correct, replace the rudder hinge-arm
attach-fitting(s) (Ref. TASK 55-36-41-000-001) and (Ref. TASK 55-3641-400-001).
(3) Make sure that the inner dimension of the bushes (17) is between
19.037 mm (0.7494 in.) and 19.058 mm (0.7503 in.). If the dimension
is not correct, replace the bushes (17).
NOTE : No wear is permitted.
____
(4) Make sure that the inner dimension of the bushes (18) is between
29.000 mm (1.1417 in.) and 29.033 mm (1.1430 in.).
(5) If the dimension is not correct, replace the rudder hinge-arm
attach-fitting(s) (Ref. TASK 55-36-41-000-001) and (Ref. TASK 55-3641-400-001).
(6) Make sure that there is no play between the bushes (17) and the
bushes (18) in the hinge-arm.
NOTE : No play is permitted.
____
Subtask 27-21-41-220-063
K. Measurement of the Dimensions of the Attachment Bolts and Bushes
(Ref. Fig. 601/TASK 27-21-41-991-007)
(1) Measurement of the actuator attachment bolts
(a) Measure the axial play between each of the bushes (1) and their
related bolts (3), at each of the actuator attach fittings.
(b) Make sure that the axial play is a maximum of 0.034 mm (0.0013
in.).



EFF :
ALL
 27-21-41


R 
AIJ




Page 610
Nov 01/10

(c) Make sure that the bolts (3) have a minimum dimension of 19.024
mm (0.7489 in.).
NOTE : If the axial play is less than the given limit, the bolts
____
(3) can be less than the minimum dimension of 19.024 mm
(0.7489 in.).
(2) Measurement of the rudder hinge fittings
(a) Measure the axial play between the bushes (1) and their related
bolt (3) at each of the rudder fittings.
(b) Make sure that the axial play is a maximum of 0.158 mm (0.0062
in.).
(c) Make sure that the bolt (3) has a minimum diameter of 14.20 mm
(0.5590 in.).
NOTE : If the axial play is less than the given limit, the bolt
____
(3) can have a minimum diameter of less than 14.20 mm
(0.5590 in.).
5. Close-up
________
Subtask 27-21-41-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the rudder (Ref. TASK 27-21-41-400-001).
Subtask 27-21-41-942-055
B. Put the aircraft back to the serviceable condition.
(1) Remove the warning notice(s).
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-21-41


R 
AIJ




Page 611
Nov 01/10

PEDALS - REMOVAL/INSTALLATION
_____________________________
R

TASK 27-21-42-000-001
Removal of the CAPT Pedals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R

27-21-43-000-002
27-21-42-991-001
27-21-42-991-002

Removal of the Pedal Position Adjuster Assembly


Fig. 401
Fig. 402



EFF :
ALL
 27-21-42



AIJ




Page 401
Feb 01/07

3. __________
Job Set-up
Subtask 27-21-42-860-050
A. Aircraft Maintenance Configuration
(1) Remove the pedal position adjuster assembly (Ref. TASK 27-21-43-000002).
(2) Put the warning notices on the pedals (CAPT and F/O) to tell persons
not to operate them.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-42-991-001, 402/TASK 27-21-42-991-002)


Subtask 27-21-42-020-052
A. Removal of the Pedal Assembly
(1) Remove the cotter pin (2) and discard it. Remove the nut (5), the
bonding strip (4), the washer (3) and the bolt (1) (ref. Detail B).
(2) Remove the cotter pin (25) and discard it. Remove the nut (26), the
washer (27) and the bolt (40). Disengage the rod (28) from the
bellcrank (41) (Ref. Detail E).
NOTE : Apply a force on the left or right pedal (29) to simulate a
____
brake application. This gives a free passage to the bolts (39)
and (40) (Movement of the bellcranks (35) and (41)).
(3) Remove the cotter pin (38) and discard it. Remove the nut (37), the
washer (36) and the bolt (39). Disengage the rod (34) from the
bellcrank (35) (Ref. Detail E).
(4) Remove the cotter pin (16) and discard it. Remove the nut (15), the
washer (14) and the bolt (17). Disengage the rod (12) from the
bellcrank (13) (Ref. Detail D).
(5) Remove the cotter pin (6) and discard it. Remove the nut (7), the
washer (8) and the bolt (11). Disengage the rod (9) from the
bellcrank (10) (Ref. Detail C).
(6) Remove the nuts (33) and discard them. Remove the bolts (31) (Ref.
Detail F).



EFF :
ALL
 27-21-42



AIJ




Page 402
Feb 01/07

R
R

CAPT Pedals
Figure 401/TASK 27-21-42-991-001



EFF :
ALL
 27-21-42



AIJ




Page 403
Feb 01/07

R
R

CAPT Pedals
Figure 402/TASK 27-21-42-991-002



EFF :
ALL
 27-21-42



AIJ




Page 404
Feb 01/07

(7) Remove the bushes (30) and remove the pedal assembly (29) from the
structure (32).



EFF :
ALL
 27-21-42



AIJ




Page 405
Feb 01/07

TASK 27-21-42-400-001
Installation of the CAPT Pedals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

2
2
6
16
25
33
33
38

cotter
cotter
cotter
cotter
cotter
nuts
nuts
cotter

pin
pin
pin
pin
pin

27-21-01
27-21-01
27-21-01
27-21-01
32-42-01
27-21-01
27-21-01
32-42-01

pin



EFF :
ALL
 27-21-42



AIJ




03A-161
03B-161
01A-010
01A-010
04 -010
05 -010
05A-010
04 -010

Page 406
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R

27-21-43-000-002
27-21-43-400-002
27-24-00-710-001
27-21-42-991-001
27-21-42-991-002

Removal of the Pedal Position Adjuster Assembly


Installation of the Pedal Position Adjuster Assembly
Operational Test of the Rudder Hydraulic Actuation
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-21-42-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the pedal position adjuster assembly is removed
(Ref. TASK 27-21-43-000-002).
(2) On the pedals (CAPT and F/O) make sure that the warning notices are
in position to tell persons not to operate them.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-42-991-001, 402/TASK 27-21-42-991-002)


Subtask 27-21-42-420-052
A. Installation of the CAPT pedals
(1) Apply COMMON GREASE (Material No. 04-004) on the attachment hardware.
(2) Install the pedal assembly (29) between the structure (32) through
the cockpit.
NOTE : Make sure that the rods (9), (12), (28) and (34) are correctly
____
installed in their bellcranks (10), (13), (41) and (35).
(3) Install the bushes (30), the bolts (31) and the new nuts (33) (Ref.
Detail F).
(4) Install the bolt (40), the washer (27), the nut (26) and tighten it.
Secure with the new cotter pin (25) (Ref. Detail E).



EFF :
ALL
 27-21-42



AIJ




Page 407
Feb 01/07

(5) Install the bolt (39), the washer (36), the nut (37) and tighten it.
Secure with the new cotter pin (38) (Ref. Detail E).
(6) Install the bolt (17), the washer (14), the nut (15) and tighten it.
Secure with the new cotter pin (16) (Ref. Detail D).
(7) Install the bolt (11), the washer (8), the nut (7) and tighten it.
Secure with the new cotter pin (6) (Ref. Detail C).
(8) Install the bolt (1), the washer (3), the bonding strip (4), the nut
(5) and tighten it. Secure with the new cotter pin (2) (Ref. Detail
B).
(9) Install the pedal position adjuster assembly (Ref. TASK 27-21-43-400002).
Subtask 27-21-42-710-050
B. Test
(1) Do the operational test of the CAPT pedals (Ref. TASK 27-24-00-710001).
5. Close-up
________
Subtask 27-21-42-860-053
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
Subtask 27-21-42-410-051
B. Close Access
(1) Close the access door 811.
(2) Remove the access platform(s).



EFF :
ALL
 27-21-42


R 
AIJ




Page 408
Feb 01/07

TASK 27-21-42-000-002
Removal of the F/O Pedals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-43-000-002
32-42-47-000-001
32-43-12-000-001
R
R
R

27-21-42-991-003
27-21-42-991-004
27-21-42-991-005

Removal of the Pedal Position Adjuster Assembly


Removal of the Transmitter Unit - Brake Pedal (9GG)
Removal of the Brake Control Master Cylinder
(2625GM,2626GM)
Fig. 403
Fig. 404
Fig. 405



EFF :
ALL
 27-21-42



AIJ




Page 409
Feb 01/07

3. __________
Job Set-up
Subtask 27-21-42-860-051
A. Aircraft Maintenance Configuration
(1) Remove the pedal position adjuster assembly (Ref. TASK 27-21-43-000002).
(2) Remove the brake control master cylinders (2625GM, 2626GM) (Ref. TASK
32-43-12-000-001).
(3) Remove the brake pedal transmitter unit (9GG) (Ref. TASK 32-42-47000-001).
(4) Put the warning notices on the pedals (CAPT and F/O) to tell persons
not to operate them.
4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-21-42-991-003, 404/TASK 27-21-42-991-004, 405/TASK


27-21-42-991-005)
Subtask 27-21-42-020-053
A. Removal of the F/O pedals
(1) Remove the cotter pin (77) and discard it. Remove the nut (76), the
washer (75) (Ref. Detail F).
(2) Remove the bolt (79) and disconnect the rod (78).
(3) Remove the cotter pin (82) and discard it. Remove the nut (83) and
the washer (84) (Ref. Detail G).
(4) Remove the bolt (81) and disconnect the rod (80).
(5) Cut and remove the lockwire from the nuts (100) and (109) (Ref.
Detail J).
(6) Remove the nut (100) and the washer (101).
(7) Remove the pedal (74), the bush (103) and the bolt (104).
(8) Remove the nut (109) and the washer (110).
(9) Remove the pedal (85), the bush (112) and the bolt (113).



EFF :
ALL
 27-21-42



AIJ




Page 410
Feb 01/07

R
R

F/O Pedals
Figure 403/TASK 27-21-42-991-003



EFF :
ALL
 27-21-42



AIJ




Page 411
Feb 01/07

R
R

F/O Pedals
Figure 404/TASK 27-21-42-991-004



EFF :
ALL
 27-21-42



AIJ




Page 412
Feb 01/07

R
R

F/O Pedals
Figure 405/TASK 27-21-42-991-005



EFF :
ALL
 27-21-42



AIJ




Page 413
Feb 01/07

(10) Remove the cotter pin (51) and discard it. Remove the nut (52), the
bonding strip (53), the washer (54) and the bolt (55) (Ref. Detail
B).
(11) Remove the cotter pin (61) and discard it. Remove the nut (62), the
washer (63) and the bolt (64) (Ref. Detail D).
NOTE : Apply a force on the bellcrank (60) or (88). This gives a free
____
passage to the bolts (64) and (65).
(12) Remove the cotter pin (89) and discard it. Remove the nut (86), the
washer (87) and the bolt (65) (Ref. Detail D).
(13) Remove the cotter pin (94) and discard it. Remove the nut (93), the
washer (92) and the bolt (95). (Ref. Detail C).
(14) Remove the cotter pin (68) and discard it. Remove the nut (69), the
washer (70) and the bolt (73) (Ref. Detail E).
(15) Remove the nuts (108) and discard them. Remove the bolts (106).
(16) Remove the bushes (105) and the pedal assembly by gravity.
NOTE : Before you remove the pedal assembly, you must move it forward
____
to keep the rods (66), (67), (71) and (90) free.



EFF :
ALL
 27-21-42



AIJ




Page 414
Feb 01/07

TASK 27-21-42-400-002
Installation of the F/O Pedals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-42



AIJ




Page 415
Feb 01/07

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

51
51
61
68
77
82
89
94
108

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
nuts

pin
pin
pin
pin
pin
pin
pin
pin

27-21-01
27-21-01
32-42-01
27-21-01
32-42-01
32-42-01
32-42-01
27-21-01
27-21-01

03A-161
03B-161
04 -010
01A-010
04 -010
04 -010
04 -010
01A-010
06 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-43-000-001
27-21-43-400-002
27-24-00-710-001
32-42-47-000-001
32-42-47-400-001
32-43-12-000-001
32-43-12-400-001

Removal of the Pedal Position Adjuster Assembly


Installation of the Pedal Position Adjuster Assembly
Operational Test of the Rudder Hydraulic Actuation
Removal of the Transmitter Unit - Brake Pedal (9GG)
Installation of the Transmitter Unit - Brake Pedal
(9GG)
Removal of the Brake Control Master Cylinder
(2625GM,2626GM)
Installation of the Brake Control Master Cylinder
(2625GM,2626GM)

3. __________
Job Set-up
Subtask 27-21-42-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the pedal position adjuster assembly is removed
(Ref. TASK 27-21-43-000-001).
(2) Make sure that the brake control master cylinders (2625GM, 2626GM)
are removed (Ref. TASK 32-43-12-000-001).
(3) Make sure that the brake pedal transmitter unit (9GG) is removed
(Ref. TASK 32-42-47-000-001).



EFF :
ALL
 27-21-42



AIJ




Page 416
Feb 01/11

(4) On the pedals (CAPT and F/O) make sure that the warning notices are
in position to tell persons not to operate them.
4. Procedure
_________
Subtask 27-21-42-420-051
A. Installation of the F/O pedals
(1) Apply COMMON GREASE (Material No. 04-004) on the attachment hardware.
(2) Install the pedal assembly between the structure (107) through the
avionics compartment.
NOTE : Make sure that the rods (66), (67), (71) and (90) are
____
correctly installed in their bellcranks (60), (88), (72) and
(91).
(3) Install the bushes (105), the bolts (106) and the new nuts (108).
(4) Install the bolt (95), the washer (92), the nut (93) and the new
cotter pin (94) (Ref. Detail C).
(5) Install the bolt (64), the washer (63), the nut (62) and the new
cotter pin (61) (Ref. Detail D).
(6) Install the bolt (65), the washer (87), the nut (86) and the new
cotter pin (89) (Ref. Detail D).
(7) Install the bolt (73), the washer (70), the nut (69) and the new
cotter pin (68) (Ref. Detail E).
(8) Install the bolt (55), the washer (54), the bonding strip (53), the
nut (52) and the new cotter pin (51) (Ref. Detail B).
(9) Install the bolt (104) on the post (72) with the bush (103) and the
pedal (74).
(10) Install the washer (101) and the nut (100).
(11) Install the bolt (113) on the post (91) with the bush (112) and the
pedal (85).
(12) Install the washer (110) and the nut (109).
(13) Safety the nuts (100) and (109) with Lockwire corrosion resistant
steel dia 0.8 mm (0.03 in.).



EFF :
ALL
 27-21-42


R 
AIJ




Page 417
Feb 01/07

(14) Connect the rod (78) to the pedal (74) with the bolt (79) (Ref.
Detail G).
(15) Install the washer (75), the nut (76) and the new cotter pin (77).
(16) Connect the rod (80) to the pedal (85) with the bolt (81) (Ref.
Detail H).
(17) Install the washer (84), the nut (83) and the new cotter pin (82).
Subtask 27-21-42-710-052
B. Test
(1) Preparation for the Test
(a) Install the pedal position adjuster assembly (Ref. TASK 27-21-43400-002).
(b) Install the brake pedal transmitter unit (9GG) (Ref. TASK 32-4247-400-001).
(c) Install the brake control master cylinders (2625GM and 2626GM)
(Ref. TASK 32-43-12-400-001).
(2) Do the operational test of the F/O pedals (Ref. TASK 27-24-00-710001).
5. Close-up
________
Subtask 27-21-42-860-055
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).



EFF :
ALL
 27-21-42


R 
AIJ




Page 418
Feb 01/07

ADJUSTER ASSY - PEDAL POSITION - SERVICING


__________________________________________
TASK 27-21-43-600-001
Lubrication of the Rack/Slider Linkage of the Pedal Position Adjuster
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-08
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

warning notice(s)
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 11-026D

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
F
ASN 42202
GENERAL CLEANING AGENT - MULTI PURPOSE
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-003
27-21-43-991-006

Depressurize the Blue Hydraulic System


Fig. 301



EFF :
ALL
 27-21-43



AIJ




Page 301
Feb 01/11

3. __________
Job Set-up
Subtask 27-21-43-860-057
A. Aircraft Maintenance Configuration
(1) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(2) Put the warning notice(s) on the CAPT and F/O pedals to tell persons
not to use the rudder.
Subtask 27-21-43-010-054
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 811.
(2) Open the access door 811.
4. Procedure
_________
(Ref. Fig. 301/TASK 27-21-43-991-006)
Subtask 27-21-43-640-052
A. Lubrication
NOTE : Do these steps on the CAPT and F/O pedals.
____
(1) Apply CLEANING AGENTS (Material No. 11-026D) to the junction (3) of
the rack (2) and slider (1).
(2) Apply COMMON GREASE (Material No. 04-004) to the junction (3) of the
rack (2) and slider (1).
(3) In the cockpit, operate the pedal position adjuster fully many times
so that the grease goes into the mechanism.
(4) Apply a second coat of COMMON GREASE (Material No. 04-004) to the
junction (3) of the rack (2) and slider (1).



EFF :
ALL
 27-21-43



AIJ




Page 302
Feb 01/11

R
R

Rack/Slider Linkage of the Pedal Position Adjuster


Figure 301/TASK 27-21-43-991-006



EFF :
ALL
 27-21-43



AIJ




Page 303
Feb 01/07

5. Close-up
________
Subtask 27-21-43-860-056
A. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the access platform(s).
Subtask 27-21-43-410-054
B. Close Access
(1) Close the access door 811.
(2) Remove the warning notice(s).



EFF :
ALL
 27-21-43


R 
AIJ




Page 304
Feb 01/07

ADJUSTER ASSY - PEDAL POSITION - REMOVAL/INSTALLATION


_____________________________________________________
TASK 27-21-43-000-002
Removal of the Pedal Position Adjuster Assembly
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
98A27901002000

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE


1 PIN,RIGGING-RUDDER CONTROL

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
29-10-00-863-003
29-10-00-864-003
27-21-43-991-003
27-21-43-991-004
27-21-43-991-005

Energize the Ground Service Network from the External


Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Fig. 401
Fig. 402
Fig. 403



EFF :
ALL
 27-21-43



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-21-43-861-051
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001)
Subtask 27-21-43-010-052
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(2) Open the access door 811.
Subtask 27-21-43-860-053
C. Aircraft Maintenance Configuration
(1) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(2) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.

(3) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (1) on the


yaw/brake bellcrank (2) (see detail B).
(Ref. Fig. 401/TASK 27-21-43-991-003)
(4) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-43-991-003, 402/TASK 27-21-43-991-004, 403/TASK
27-21-43-991-005)
Subtask 27-21-43-020-055
A. Removal of the Pedal Position Adjuster Assembly
(1) Remove the cotter pin (30) and discard it.
(2) Remove the nut (31), the washer (32) and the bolt (38).
(3) In the cockpit, remove the screws (10) and the washers (11).
(4) Remove the screws (6) and the washers (7).



EFF :
ALL
 27-21-43



AIJ




Page 402
Feb 01/11

R
R

Rigging Pin Location


Figure 401/TASK 27-21-43-991-003



EFF :
ALL
 27-21-43



AIJ




Page 403
Feb 01/07

R
R

Component Location
Figure 402/TASK 27-21-43-991-004



EFF :
ALL
 27-21-43



AIJ




Page 404
Feb 01/07

R
R

Rack Assembly
Figure 403/TASK 27-21-43-991-005



EFF :
ALL
 27-21-43



AIJ




Page 405
Feb 01/07

(5) Cut and remove the lockwire from the nut (43).
(6) Fully loosen the nut (43).
(7) Fully tighten the screw (44).
(8) Remove the clip (45).
(9) Lightly pull the handle (15) so that you can remove the pin (16).
(10) Remove the pin (16).
NOTE : The pin (16) has a slot so that you can disengage it from the
____
cable (17) when you remove it.
(11) Pull the cable (17) lightly down and remove the cover (5) with the
rod (39).
(12) Remove the locking-pin (46).
(13) Remove the pin (40).
NOTE : The pin (40) has a slot so that you can disengage it from the
____
cable (17) when you remove it.
(14) Remove the cable (17).
(15) Remove the screw (44) and the nut (43).
(16) Remove the cotter pin (22) and discard it.
(17) Remove the nut (21), the washer (20) and the bolt (18).
(18) Remove the cotter pin (23) and discard it.
(19) Remove the nut (24), the bolt (27) and the washers (25).
(20) Lift the lower part of the rack assembly (26) to compress the springs
(41) and (42). Remove the spacer (28).
(21) Remove the rack assembly (26) and the springs (41) and (42).
(22) Remove the cotter pins (33) and discard them.
(23) Remove the washers (34) and the pins (36).
(24) Remove the actuator (37).



EFF :
ALL
 27-21-43



AIJ




Page 406
Feb 01/07

TASK 27-21-43-400-002
Installation of the Pedal Position Adjuster Assembly
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
98A27901002000

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE


1 PIN,RIGGING-RUDDER CONTROL

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-43



AIJ




Page 407
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------22
23
30
33
45

cotter
cotter
cotter
cotter
clip

pin
pin
pin
pins

27-21-01
27-21-01
27-21-01
27-21-01
27-21-01

02B-040
02B-040
02B-040
02B-095
02B-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
29-10-00-863-003
27-21-43-991-003
27-21-43-991-004
27-21-43-991-005

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-21-43-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. TASK 2442-00-861-001).
R
R

(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position.
(3) Make sure that the access door 811 is open.
(4) Make sure that the Blue hydraulic system is depressurized (Ref. TASK
29-10-00-863-003).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.



EFF :
ALL
 27-21-43



AIJ




Page 408
Feb 01/11

(6) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (1) is


installed on the yaw/brake bellcrank (see detail B)
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-43-991-003, 402/TASK 27-21-43-991-004, 403/TASK
27-21-43-991-005)
Subtask 27-21-43-420-055
A. Installation of the Pedal Position Adjuster Assembly
(1) Apply COMMON GREASE (Material No. 04-004) to the attachment hardware.
(2) Install the springs (41) and (42) on the rack assembly (26).
(3) Lift the lower part of the rack assembly (26) to compress the springs
(41) and (42).
(4) Install the rack assembly (26) on the yoke (29) with the spacer (28)
and on the structure (19) with the bolt (18).
(5) Install the washer (20), the nut (21) and the new cotter pin (22).
(6) Install the washers (25), the bolt (27), the nut (24) and the new
cotter pin (23).
(7) Install the nut (43) and the screw (44).
NOTE : Engage all the threads of the screw (44) but do not fully
____
tighten it.
(8) Install the actuator (37) with the pins (36) on the structure (35)
and the yoke (29).
(9) Install the washers (34) and the new cotter pins (33).
(10) Install the cable (17) through the screw (44) and to the lower part
of the rack assembly (26) with the pin (40).
NOTE : The pin (40) has a slot and a recess for the head of the cable
____
(17).
(11) Install the locking pin (46).
(12) Install the cover (5) on the structure (8) and (9).



EFF :
ALL
 27-21-43



AIJ




Page 409
Feb 01/11

(13) Put the cable (17) through the cover (5) and install the pin (16) on
the handle (15).
NOTE : The pin (16) has a slot and a recess for the head of the cable
____
(17).
(14) Install the new clip (45).
(15) Install the washers (11) and the screws (10).
(16) Install the washers (7) and the screws (6).
(17) Connect the rod (39) to the yoke (29) with the screw (38).
(18) Install the washer (32), the nut (31) and the new cotter pin (30).
Subtask 27-21-43-820-050
B. Adjustment
(Ref. Fig. 403/TASK 27-21-43-991-005)

NOTE : During the adjustment of the cable length, make sure that the
____
terminal heads of the cables (17) are in position in their
housings.
(1) Adjust the length of each rack unlocking control-cable so that the
adjustment position limits, the non-control (measured at the handle)
is between 0.8 mm (0.0314 in.) and 2 mm (0.0787 in.).
(a) Slowly loosen the screw (44) until you get a non-control
clearance at the handle (15) (Ref. Section CC).
- position 0: non-control more than or equal to 0.8 mm (0.0314
in.)
- position 12: non-control less than or equal to 2 mm (0.0787
in.).
(2) Tighten the nut (43).
(3) Safety the nut (43) with Lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).



EFF :
ALL
 27-21-43



AIJ




Page 410
Feb 01/07

Subtask 27-21-43-710-051
C. Operational Test
(1) Remove the pin (1) (Ref. Detail B).
(Ref. Fig. 401/TASK 27-21-43-991-003)

(2) Do two or three operations from one stop to the other stop.
To do this:
(a) Pull the handle (15).
(b) Move the pedals to the stop.
(c) Release the handle (15).
(3) When the pedal is against the stop, make sure that the non-control
clearance is correct. This shows that the rack assembly (26) is
locked.
Do the adjustment again if it is not correct.
5. Close-up
________
Subtask 27-21-43-860-055
A. Put the aircraft back to its initial configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
Subtask 27-21-43-410-053
B. Close Access
(1) Close the access door 811.
(2) Remove the access platform(s).



EFF :
ALL
 27-21-43



AIJ




Page 411
Feb 01/07

BELLCRANK - YAW/BRAKE - REMOVAL/INSTALLATION


____________________________________________
TASK 27-21-44-000-001
Removal of the CAPT Yaw/Brake Bellcrank
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
98A27901002000

warning notice
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
1 PIN,RIGGING-RUDDER CONTROL

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-44-991-001
27-21-44-991-002
27-21-44-991-003

Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-21-44-941-050
A. Put the Warning Notice
(1) Put a warning notice to tell persons not to pressurize the Green and
the Yellow hydraulic systems.
(2) Put a warning notice to tell persons not to operate the pedals.



EFF :
ALL
 27-21-44



AIJ




Page 401
Feb 01/11

Subtask 27-21-44-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(2) Open the access door 811.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-44-991-001, 402/TASK 27-21-44-991-002, 403/TASK
27-21-44-991-003)
Subtask 27-21-44-480-050
A. Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36) on the
tension regulator.
Subtask 27-21-44-020-050
B. Removal of the CAPT Yaw/Brake Bellcrank
(1) Remove the cotter pin (24) and discard it. Remove the nut (23) and
the washer (22).
(2) Remove the bolt (21) and disconnect the rod (17).
(3) Remove the cotter pin (11) and discard it. Remove the nut (12) and
the washer (10).
(4) Remove the bolt (3) and disconnect the rod (4).
(5) Remove the cotter pin (19) and discard it. Remove the nut (20) and
the washer(18).
(6) Remove the bolt (1) and disconnect the rod (9).
(7) Remove the cotter pin (32) and discard it. Remove the nut (31) and
the washer (30).
(8) Remove the bolt (34) and disconnect the rods (29) and (33).
(9) Remove the cotter pin (63) and discard it. Remove the nut (64) and
the washer (65).
(10) Remove the bolt (67) and disconnect the rod (68).



EFF :
ALL
 27-21-44



AIJ




Page 402
Feb 01/11

R
R

Location of the Rigging Points


Figure 401/TASK 27-21-44-991-001



EFF :
ALL
 27-21-44



AIJ




Page 403
Feb 01/07

R
R

CAPT Yaw/Brake Bellcrank


Figure 402/TASK 27-21-44-991-002



EFF :
ALL
 27-21-44



AIJ




Page 404
Feb 01/07

R
R

CAPT Yaw/Brake Bellcrank


Figure 403/TASK 27-21-44-991-003



EFF :
ALL
 27-21-44



AIJ




Page 405
Feb 01/07

(11) Remove the cotter pin (58) and discard it. Remove the nut (57) and
the washer (56).
(12) Remove the bolt (52) and disconnect the rod (69).
(13) Remove the cotter pin (60) and discard it. Remove the nut (59) and
the washer (61).
(14) Remove the bolt (70) and disconnect the rod (66).
(15) Remove the cotter pin (55) and discard it. Remove the nut (54) and
the washer (53).
(16) Remove the bolt (51) and disconnect the rod (62).
(17) Remove the cotter pin (48) and discard it. Remove the nut (47) and
the washer (46).
(18) Remove the bolt (43) and disconnect the rod (42).
(19) Remove the nuts (41) and discard them. Remove the bolts (49) and the
bolts (50).
(20) Turn the yaw bellcrank (2) 90 deg. to make the removal of the
yaw/brake bellcrank possible.
(21) Remove the sleeves (45) and (73) and the yaw/brake bellcrank.



EFF :
ALL
 27-21-44



AIJ




Page 406
Feb 01/07

TASK 27-21-44-400-001
Installation of the CAPT Yaw/Brake Bellcrank
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
98A27901002000

warning notice
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
3 PIN,RIGGING-RUDDER CONTROL

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
No specific
Material No. 04-004

lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
Lockwire corrosion resistant steel dia 0.8 mm (0.03
in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-44



AIJ




Page 407
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------11
19
24
32
48
55
58
60
63

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin

27-21-01
27-21-01
27-21-01
27-21-01
27-21-01
32-42-01
32-42-01
32-42-01
32-42-01

01A-010
01A-010
01A-010
01A-010
07 -010A
04 -010
04 -010
04 -010
04 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-00-710-001
32-42-00-710-001
32-43-00-710-001
27-21-44-991-001
27-21-44-991-002
27-21-44-991-003

Operational Test of the Rudder Hydraulic Actuation


Operational Check of the Normal Braking System
Operational Check of Alternate Braking System
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-21-44-010-052
A. Get Access
R

(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position.
(2) Make sure that the access door 811 is open.
(3) Make sure that the warning notice to tell persons not to operate the
Green and the Yellow hydraulic systems is in position.
(4) Make sure that the warning notice to tell persons not to operate the
pedals is in position.



EFF :
ALL
 27-21-44



AIJ




Page 408
Feb 01/11

(5) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36)


is in position on the tension regulator.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-44-991-001, 402/TASK 27-21-44-991-002, 403/TASK
27-21-44-991-003)
Subtask 27-21-44-420-050
A. Installation of the CAPT Yaw/Brake Bellcrank
(1) Apply COMMON GREASE (Material No. 04-004) to the attachment hardware.
(2) Turn the yaw bellcrank (2) 90 deg. and install the yaw/brake
bellcrank on the beam (40).
(3) Install the sleeves (45) and (73).
(4) Install the bolts (50), (49); install and tighten the new nuts (41).
(5) Install the rod (42) on the sleeve (45) and install the bolt (43).
(6) Install the washer (46) and install and tighten the nut (47). Safety
it with the new cotter pin (48).
(7) Install the rod (62) and install the bolt (51).
(8) Install the washer (53), install and tighten the nut (54). Safety it
with the new cotter pin (55).
(9) Install the rod (66), install the bolt (70).
(10) Install the washer (61) and install and tighten the nut (59). Safety
it with the new cotter pin (60).
(11) Install the rod (69), install the bolt (52).
(12) Install the washer (56) and install and tighten the nut (57). Safety
it with the new cotter pin (58).
(13) Install the rod (68), install the bolt (67).
(14) Install the washer (65) and install and tighten the nut (64). Safety
it with the new cotter pin (63).



EFF :
ALL
 27-21-44



AIJ




Page 409
Nov 01/09

(15) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (35) on the


yaw/brake bellcranks of the CAPT and F/O.
(16) Push and hold the pin on the transducer unit 25CE1 to lock the input
lever in the zero position.
NOTE : The pin is a part of the transducer unit 25CE1.
____
(17) Install the rods (33) and (29) and install the bolt (34). If
necessary, adjust the length of the rod (29) as follows:
(a) Cut and discard the lockwire.
(b) Loosen the nuts (25) and (28) and disengage the lockwashers (26)
and (27).
(c) Adjust the length of the rod (29) until you can install the bolt
(34).
(d) Engage the lockwashers (26) and (27) and tighten the nuts (25)
and (28). Safety them with Lockwire corrosion resistant steel dia
0.8 mm (0.03 in.).
(18) Disengage the pin to release the input lever of the transducer unit
25CE1.
(19) Install the washer (30), install and tighten the nut (31). Safety it
with the new cotter pin (32).
(20) Install the rod (9) and the bolt (1).
(21) Install the washer (18), install and tighten the nut (20). Safety it
with the new cotter pin (19).
(22) Install the rod (4) and install the bolt (3). If necessary, adjust
the length of the rod (4) as follows:
(a) Cut and discard the lockwire from the nuts of the rod (4).
(b) Loosen the nuts (5) and (7) and disengage the lockwashers (6) and
(8).
(c) Turn the rod body (37) until you can install and remove the
rigging pins (35) and (36) freely.
(d) Engage the lockwashers (6) and (8).



EFF :
ALL
 27-21-44



AIJ




Page 410
Nov 01/09

(e) Torque the nut (7) to 1.2 m.daN (106.19 lbf.in) and the nut (5)
to 0.5 m.daN (44.24 lbf.in).
(f) Make sure that the adjustment is correct after you have tightened
the nuts.
(g) Safety the nuts with lockwire corrosion resistant steel dia 0.8
mm (0.03 in.)
(23) Install the washer (10), install and tighten the nut (12). Safety it
with the new cotter pin (11).
(24) Install the rod (17) and the bolt (21). If necessary, adjust the
length of the rod (17) as follows:
(a) Cut and discard the lockwire.
(b) Loosen the nuts (13) and (16) and disengage the lockwashers (14)
and (15).
(c) Adjust the length of the rod (17) until you can install the bolt
(21).
(d) Engage the lockwashers (14) and (15) and TORQUE the nuts (13) and
(16) to 1.374 m.daN (10.13 lbf.ft). Safety them with Lockwire
corrosion resistant steel dia 0.8 mm (0.03 in.).
(25) Install the washer (22), install and tighten the nut (23). Safety it
with the new cotter pin (24).
R

(26) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (35) from the


yaw/brake bellcranks of the CAPT and F/O.
Subtask 27-21-44-080-050

B. Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36) from the


tension regulator.
Subtask 27-21-44-710-050
C. Test of the CAPT Yaw/Brake Bellcrank
(1) Do the operational test of the rudder mechanical control (Ref. TASK
27-24-00-710-001).
(2) Do the operational test of the normal braking system (operational
check of the pedals) (Ref. TASK 32-42-00-710-001).



EFF :
ALL
 27-21-44



AIJ




Page 411
Nov 01/09

(3) Do the operational test of the alternate braking system (operational


check of the pedals) (Ref. TASK 32-43-00-710-001).
5. Close-up
________
Subtask 27-21-44-942-050
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
Subtask 27-21-44-410-050
B. Close Access
(1) Close the access door 811.
(2) Remove the access platform(s).



EFF :
ALL
 27-21-44


R 
AIJ




Page 412
Nov 01/09

TASK 27-21-44-000-002
Removal of the F/O Yaw/Brake Bellcrank
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
98A27901002000

warning notice
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
1 PIN,RIGGING-RUDDER CONTROL

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-44-991-001
27-21-44-991-004
27-21-44-991-005

Fig. 401
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-21-44-941-053
A. Put the warning notice
(1) Put a warning notice to tell persons not to pressurize the Green and
the Yellow hydraulic systems.
(2) Put a warning notice to tell persons not to operate the pedals.



EFF :
ALL
 27-21-44



AIJ




Page 413
Feb 01/11

Subtask 27-21-44-010-051
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(2) Open the access door 811.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-44-991-001, 404/TASK 27-21-44-991-004, 405/TASK
27-21-44-991-005)
Subtask 27-21-44-480-051
A. Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36) on the
tension regulator.
Subtask 27-21-44-020-051
B. Removal of the F/O Yaw/Brake Bellcrank
(1) Remove the cotter pin (88) and discard it. Remove the nut (87) and
the washer (86).
(2) Remove the bolt (85) and disconnect the rod (89).
(3) Remove the cotter pin (99) and discard it. Remove the nut (100) and
the washer (101).
(4) Remove the bolt (103) and disconnect the rods (98) and (102).
(5) Remove the cotter pin (83) and discard it. Remove the nut (84) and
the washer (82).
(6) Remove the bolt (80) and disconnect the rod (81).
(7) Remove the cotter pin (125) and discard it. Remove the nut (124) and
the washer (123).
(8) Remove the bolt (117) and disconnect the rod (118).
(9) Remove the cotter pin (129) and discard it. Remove the nut (130) and
the washer (131).
(10) Remove the bolt (134) and disconnect the rod (119).



EFF :
ALL
 27-21-44



AIJ




Page 414
Feb 01/11

R
R

F/O Yaw/Brake Bellcrank


Figure 404/TASK 27-21-44-991-004



EFF :
ALL
 27-21-44



AIJ




Page 415
Feb 01/07

R
R

F/O Yaw/Brake Bellcrank


Figure 405/TASK 27-21-44-991-005



EFF :
ALL
 27-21-44



AIJ




Page 416
Feb 01/07

(11) Remove the cotter pin (121) and discard it. Remove the nut (122) and
the washer (120).
(12) Remove the bolt (116) and disconnect the rod (132).
(13) Remove the cotter pin (127) and discard it. Remove the nut (126) and
the washer (128).
(14) Remove the bolt (135) and disconnect the rod (133).
(15) Remove the cotter pin (139) and discard it. Remove the nut (140) and
the washer (141).
(16) Remove the bolt (144) and disconnect the rod (143).
(17) Remove the nuts (111) and discard them. Remove the bolts (114) and
the bolts (115).
(18) Remove the sleeves (138) and (113) and the yaw/brake bellcrank.



EFF :
ALL
 27-21-44



AIJ




Page 417
Feb 01/07

TASK 27-21-44-400-002
Installation of the F/O Yaw/Brake Bellcrank
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
98A27901002000

warning notice
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
3 PIN,RIGGING-RUDDER CONTROL

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-44



AIJ




Page 418
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------83
88
99
121
125
127
129
139

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin

27-21-01
27-21-01
27-21-01
32-42-01
32-42-01
32-42-01
32-42-01
27-21-01

01A-010
01A-010
01A-010
04 -010
04 -010
04 -010
04 -010
08 -010B

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-00-710-001
32-42-00-710-001
32-43-00-710-001
27-21-44-991-001
27-21-44-991-004
27-21-44-991-005

Operational Test of the Rudder Hydraulic Actuation


Operational Check of the Normal Braking System
Operational Check of Alternate Braking System
Fig. 401
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-21-44-010-053
A. Get Access
R

(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position.
(2) Make sure that the access door 811 is open.
(3) Make sure that the warning notice to tell persons not to operate the
Green and the Yellow hydraulic systems is in position.
(4) Make sure that the warning notice to tell persons not to operate the
pedals is in position.
(5) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36)
is in position on the tension regulator.



EFF :
ALL
 27-21-44



AIJ




Page 419
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-44-991-001, 404/TASK 27-21-44-991-004, 405/TASK


27-21-44-991-005)
Subtask 27-21-44-420-051
A. Installation of the F/O Yaw/Brake Bellcrank
(1) Apply COMMON GREASE (Material No. 04-004) to the attachment hardware.
(2) Install the yaw/brake bellcrank on the beam (110).
(3) Install the sleeves (138) and (113).
(4) Install the bolts (114), the bolts (115), install and tighten the new
nuts (111).
(5) Install the rod (143) on the sleeve (138) and install the bolt (144).
(6) Install the washer (141), install and tighten the nut (140). Safety
it with the new cotter pin (139).
(7) Put the rod (133) in position and install the bolt (135).
(8) Install the washer (128), install and tighten the nut (126). Safety
it with the new cotter pin (127).
(9) Install the rod (132) and the bolt (116).
(10) Install the washer (120), install and tighten the nut (122). Safety
it with the new cotter pin (121).
(11) Put the rod (119) in position and install the bolt (134).
(12) Install the washer (131), install and tighten the nut (130). Safety
it with the new cotter pin (129).
(13) Install the rod (118) and the bolt (117).
(14) Install the washer (123) and install and tighten the nut (124).
Safety it with the new cotter pin (125).
(15) Install the rod (81) and the bolt (80).
(16) Install the washer (82), install and tighten the nut (84). Safety it
with the new cotter pin (83).



EFF :
ALL
 27-21-44



AIJ




Page 420
Feb 01/07

(17) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (35) on the


yaw/brake bellcranks of the CAPT and F/O.
(18) Push and hold the pin on the transducer unit 25CE2 to lock the input
lever in the zero position.
NOTE : The pin is a part of the transducer unit 25CE2.
____
(19) Install the rods (98) and (102) and install the bolt (103). If
necessary, adjust the length of the rod (98) as follows:
(a) Cut and discard the lockwire.
(b) Loosen the nuts (94) and (97) and disengage the lockwashers (95)
and (96).
(c) Adjust the length of the rod (98) until you can install the bolt
(103).
(d) Engage the lockwashers (95) and (96) and tighten the nuts (94)
and (97). Safety them with Lockwire corrosion resistant steel dia
0.8 mm (0.03 in.).
(20) Disengage the pin to release the input lever of the transducer unit
25CE2.
(21) Install the washer (101) and install and tighten the nut (100).
Safety it with the new cotter pin (99).
(22) Install the rod (89) and the bolt (85). If necessary, adjust the
length of the rod (89) as follows:
(a) Cut and discard the lockwire.
(b) Loosen the nuts (90) and (93) and disengage the lockwashers (91)
and (92).
(c) Adjust the length of the rod (89) until you can install the bolt
(85).
(d) Engage the lockwashers (91) and (92) and TORQUE the nuts (90) and
(93) to 1.374 m.daN (10.13 lbf.ft). Safety them with Lockwire
corrosion resistant steel dia 0.8 mm (0.03 in.).
(23) Install the washer (86), install and tighten the nut (87). Safety it
with the new cotter pin (88).



EFF :
ALL
 27-21-44



AIJ




Page 421
Nov 01/09

(24) Remove PIN,RIGGING-RUDDER CONTROL (98A27901002000) (35) from the


yaw/brake bellcranks of the CAPT and F/O.
Subtask 27-21-44-080-051

B. Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (36) from the


tension regulator.
Subtask 27-21-44-710-051
C. Test of the F/O Yaw/Brake Bellcrank
(1) Do the operational test of the rudder mechanical control (Ref. TASK
27-24-00-710-001).
(2) Do the operational test of the normal braking system (operational
check of the pedals) (Ref. TASK 32-42-00-710-001).
(3) Do the operational test of the alternate braking system (operational
check of the pedals) (Ref. TASK 32-43-00-710-001).
5. Close-up
________
Subtask 27-21-44-942-053
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
Subtask 27-21-44-410-051
B. Close Access
(1) Close the access door 811.
(2) Remove the access platform(s).



EFF :
ALL
 27-21-44



AIJ




Page 422
Nov 01/09

REGULATOR - CABLE TENSION (103CM) - REMOVAL/INSTALLATION


________________________________________________________
TASK 27-21-45-000-001
Removal of the Cable Tension Regulator Assy
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS CAN
_______
CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN POSITION ON
THE RUDDER CONTROL.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
FE171901
98A27901002000
98D27207516000
98D27207547000

1
1
1
1
1
1

ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
TOOL - LOCKING
PIN,RIGGING-RUDDER CONTROL
TBD
PIN-RIGGING



EFF :
ALL
 27-21-45



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
27-21-45-991-001
27-21-45-991-002
27-21-45-991-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-21-45-010-052
A. Get Access
(1) Remove the panel 211GF at zone 211.
(Ref. Fig. 401/TASK 27-21-45-991-001)
R

(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone


121.
(3) Open the access doors 811.

(4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
312.
(5) Open the access doors 312AR.
Subtask 27-21-45-860-050
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
(2) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-21-45



AIJ




Page 402
Feb 01/11

R
R

Component Location
Figure 401/TASK 27-21-45-991-001



EFF :
ALL
 27-21-45



AIJ




Page 403
Feb 01/07

(3) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed.
(4) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on these pushbuttons switches, the OFF
and FAULT legends are off).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(6) In zone 121, install the PIN,RIGGING-RUDDER CONTROL (98A27901002000)
(6) on the CAPT yaw/brake bellcrank (5) (Ref. Detail C).
(Ref. Fig. 401/TASK 27-21-45-991-001)
R
R

(7) In zone 311, install the PIN-RIGGING (98D27207547000) (8) or TBD


(98D27207516000) pin (98D27207516160) on the cable quadrant (1) (Ref.
Details B and D).
(8) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(Ref. Fig. 401/TASK 27-21-45-991-001)
(9) Make sure that the Yellow and Green hydraulic systems are
depressurized. (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002)
(10) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002)
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-45-991-001, 402/TASK 27-21-45-991-002, 403/TASK
27-21-45-991-003)
Subtask 27-21-45-020-052
A. Removal of the Cable Tension-Regulator Assy
(1) Remove the cotter pins (35) from the cable housings of the regulator
(15) (Ref. Details F and G).
(2) Remove the cotter pins (50), the nuts (49), the washers (48), the
screws (46) and the spacers (47) (Ref. Detail K).
(3) Cut and remove the lockwire from the nuts (3) of the cable quadrant
(1) turnbuckles (Ref. Details B and D).



EFF :
ALL
 27-21-45



AIJ




Page 404
Feb 01/11

R
R

Cable Tension Regulator Assy


Figure 402/TASK 27-21-45-991-002



EFF :
ALL
 27-21-45



AIJ




Page 405
Feb 01/07

R
R

Cable Tension regulator Assy


Figure 403/TASK 27-21-45-991-003



EFF :
ALL
 27-21-45



AIJ




Page 406
Feb 01/07

(4) Loosen the nuts (3) and the screws (2) until it is possible to
install the TOOL - LOCKING (FE171901) (45) on the regulator (15)
(Ref. Details D and L).
(5) Install the locking equipment (45) on the regulator (15) with the
rigging pins (44) (Ref. Detail L).
(6) Fully loosen the nuts (3) and the screws (2).
(7) Remove the cables (7) and (9) from the regulator (15) (Ref. Details F
and G) and hang them on the structure.
(8) Remove the cotter pin (40), the nut (41) and the washer (43) (Ref.
Detail J).
(9) Remove the screw (42) and disconnect the rod (4) from the regulator
(15).
(10) Remove the cotter pin (38), the nut (37) and the washer (36) (Ref.
Detail H).
(11) Remove the screw (39) and disconnect the rod (23) from the regulator
(15).
(12) Remove the cotter pin (17), the nut (18) and the washer (19).
(13) Remove the cotter pin (29), the nut (28) and the washer (27).
(14) Remove the screws (22) (24), the spacers (21), (25) and remove the
regulator (15).



EFF :
ALL
 27-21-45


R 
AIJ




Page 407
Feb 01/11

TASK 27-21-45-400-001
Installation of the Cable Tension Regulator Assy
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific

98A27901002000
98D27207516000
98D27207547000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
2 PIN,RIGGING-RUDDER CONTROL
1 TBD
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.6 mm (0.02


in.)
Lockwire corrosion resistant steel dia 0.8 mm (0.03
in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-45



AIJ




Page 408
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------17
29
35
38
40

cotter
cotter
cotter
cotter
cotter

pin
pin
pins
pin
pin

27-21-01
27-21-01
27-21-01
27-21-01
27-21-01

12B-070
12B-070
12B-010
12B-010
01A-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
27-21-00-820-002
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
27-21-45-991-001
27-21-45-991-002
27-21-45-991-003

Energize the Aircraft Electrical Circuits from the


External Power
Adjustment of the Rudder Control-Cables Length
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-21-45-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the panel 211GF at zone 211 is removed.
(Ref. Fig. 401/TASK 27-21-45-991-001)
R

(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position at zone 121.
(3) Make sure that the access door 811 is open.

R
R

(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at zone 312.
(5) Make sure that the access door 312AR is open.



EFF :
ALL
 27-21-45



AIJ




Page 409
Feb 01/11

(6) Make sure that the aircraft electrical circuits are energized
(Ref. TASK 24-41-00-861-002).
(7) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed.
(8) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on these pushbuttons switches, the OFF
and FAULT legends are off).
(9) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(10) In zone 121, on the CAPT yaw/brake bellcrank (5) make sure that the
PIN,RIGGING-RUDDER CONTROL (98A27901002000) (6) (Ref. Detail C) is
installed.
(Ref. Fig. 401/TASK 27-21-45-991-001)
(11) In zone 311, on the cable quadrant (1) (Ref. Details B and D), make
sure that the PIN-RIGGING (98D27207547000) (8) or TBD
(98D27207516000) pin (98D27207516160) is installed.

R
R

(12) Make sure that the Blue hydraulic system (Ref. TASK 29-10-00-864-003)
is depressurized.
(Ref. Fig. 401/TASK 27-21-45-991-001)
(13) Make sure that the Yellow and Green hydraulic systems are
depressurized. (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002)
(14) Make sure that the aircraft electrical circuits are de-energized.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-45-991-001, 402/TASK 27-21-45-991-002, 403/TASK
27-21-45-991-003)
Subtask 27-21-45-420-052
A. Installation of the Cable Tension-Regulator Assy
(1) Apply COMMON GREASE (Material No. 04-004) on all attaching parts.
(2) Install the regulator (15) on the support (26) with the spacer (25)
and the screw (24).



EFF :
ALL
 27-21-45



AIJ




Page 410
Feb 01/11

(3) Install the regulator (15) on the support (20) with the spacer (21)
and the screw (22).
(4) Install the washer (19), the nut (18) and the new cotter pin (17).
(5) Install the washer (27), the nut (28) and the new cotter pin (29).
NOTE : Align the shackle (16) of the regulator (15) in the center.
____
Make sure that the shackle does not touch the support (20).
(6) Connect the rod (23) to the regulator (15) with the screw (39) (Ref.
Detail H). If an adjustment is necessary, do as follows:
(a) Cut and remove the lockwire from the nuts of the rod (23).
(b) Loosen the nuts of the rod (23).
(c) Disengage the washers from the nuts of the rod (23).
(d) Adjust the rod (23) to the necessary length and without tension.
(e) TORQUE the nuts of the rod (23) to 0.59 m.daN (52.21 lbf.in). Do
not safety at this time.
(7) Install the washer (36) and the nut (37). Do not safety the nut (37)
at this time.
R

(8) Install the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (6) on the


input lever of the regulator (15) (Ref. Detail J).
(9) Connect the rod (4) to the regulator (15) with the screws (42) (Ref.
Detail J). If an adjustment is necessary, do as follows:
(a) Cut and remove the lockwire from the nuts of the rod (4).
(b) Loosen the nuts (65) and (62), and disengage the lockwashers (64)
and (61).
(c) Turn the rod body (63) until you can install and remove the
rigging pins (6) freely.
(d) Engage the lockwashers (64) and (61).
(e) TORQUE the nut (62) to 1.2 m.daN (106.19 lbf.in) and the nut (65)
to 0.5 m.daN (44.24 lbf.in) . Do not safety at this time.



EFF :
ALL
 27-21-45



AIJ




Page 411
Aug 01/08

(f) Make sure that the adjustment is correct after you have tightened
the nuts.
(10) Install the washer (43) and the nut (41). Do not safety the nut (41)
at this time.
(11) Install the cables (7) and (9) on the regulator (15) (Ref. Details F
and G).
(12) Install the new cotter pins (35) on the cable end housings of the
regulator (15).
(13) Install the spacers (47), the screws (46), the washers (48), the nuts
(49) and the new cotter pins (50) (Ref. Detail K).
(14) Tighten the screws (2) of the cable quadrant (1) turnbuckles until it
is possible to remove the locking equipment (45) from the regulator
(15).
(15) Remove this TOOL - LOCKING (FE171901) (45) with the rigging pins
(44).
R

(16) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (6) from the


CAPT yaw/brake bellcrank (5) (Ref. Detail C).
Subtask 27-21-45-820-050
B. Adjust the tension of the cables (7 and 9) (Ref. TASK 27-21-00-820-002).
NOTE : If you cannot adjust the control cables, do a visual inspection on
____
the pulleys and the tension regulator. If they are in good
condition, replace the control cables.
5. Close-up
________
Subtask 27-21-45-420-051
A. Safety the nuts and install the new cotter pin
(1) Safety the nuts (3) with Lockwire corrosion resistant steel dia 0.6
mm (0.02 in.).
(2) Safety the nuts of the rod (4) with Lockwire corrosion resistant
steel dia 0.8 mm (0.03 in.).
(3) Install the new cotter pin (40) on the nut (41).



EFF :
ALL
 27-21-45



AIJ




Page 412
Aug 01/08

(4) Safety the nuts of the rod (23) with Lockwire corrosion resistant
steel dia 0.8 mm (0.03 in.).
(5) Install the new cotter pin (38) on the nut (37).
Subtask 27-21-45-080-050
B. Removal of the tools
(1) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (6) from the
input lever of the regulator (15) (Ref. Detail J).
R

(2) Remove the PIN-RIGGING (98D27207547000) (8) or TBD (98D27207516000)


pin (98D27207516160) from the cable quadrant (1) (Ref. Details B and
D).
Subtask 27-21-45-410-050
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the panel 211GF at zone 211.
(3) Close the access doors 811, 312AR.
(4) Remove the access platform(s).



EFF :
ALL
 27-21-45



AIJ




Page 413
Feb 01/11

TASK 27-21-45-000-003
Removal of the Cable Tension Regulator (103CM)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-21-45-000-001
27-21-45-991-005

Removal of the Cable Tension Regulator Assy


Fig. 404

3. __________
Job Set-up
Subtask 27-21-45-020-053
A. Remove the cable tension regulator assy (Ref. TASK 27-21-45-000-001).
4. Procedure
_________
R

(Ref. Fig. 404/TASK 27-21-45-991-005)


Subtask 27-21-45-020-054
A. Removal of the Cable Tension Regulator
(1) Remove the six screws (21).
(2) Remove the plate (22).
(3) Cut and discard the cotter pin (17) from the nut (18).
(4) Remove the nut (18) and the washer (16).
(5) Cut and discard the cotter pin (15) and unlock the nut (14).
(6) Remove the pin (8), the bellcrank assy (19) and the sleeve (13).
(7) Remove the six nuts (10) and the six bolts (12).



EFF :
ALL
 27-21-45



AIJ




Page 414
Feb 01/07

R
R

Cable Tension Regulator (103CM)


Figure 404/TASK 27-21-45-991-005



EFF :
ALL
 27-21-45



AIJ




Page 415
Feb 01/07

(8) Cut and discard the cotter pin (2) from the nut (1).
(9) Remove the nut (1) and the washer (3).
(10) Remove the bolt (7) with the washer (6).
(11) Remove the side fittings (9) and (23) from the cable tension
regulator (11).
(12) Remove the cable tension regulator (11).
NOTE : Do not remove the spacer (20), the link (4) and the spacer (5)
____
from the side fitting (9).



EFF :
ALL
 27-21-45



AIJ




Page 416
Feb 01/07

TASK 27-21-45-400-003
Installation of the Cable Tension Regulator (103CM)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 08-003
Material No. 08-007

USA ASTM-D-5363
GP02 CL6 GRD1
THREADLOCKER/SEALANT ANAEROBIC (Ref. 20-31-00)
USA MIL-R-46082
TYPE II
THREADLOCKER/SEALANT (Ref. 20-31-00)

R
R

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-45-000-003
27-21-45-400-001

Removal of the Cable Tension Regulator (103CM)


Installation of the Cable Tension Regulator Assy

3. __________
Job Set-up
Subtask 27-21-45-860-052
A. Make sure that the cable tension regulator is removed (Ref. TASK 27-2145-000-003).



EFF :
ALL
 27-21-45



AIJ




Page 417
May 01/10

4. Procedure
_________
Subtask 27-21-45-910-050
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area.
(2) Do a visual inspection of the component interface and/or the adjacent
area.
Subtask 27-21-45-420-053
B. Installation of the Cable Tension Regulator
(1) Make sure that the spacer (4), the link (5) and the spacer (20) are
still installed on the side fitting (9).
(2) Install the side fittings (9) and (23) on the cable tension regulator
(11).
(3) Install the bolt (7), the washers (6) and (3), the nut (1) and
tighten.
(4) Install a new cotter pin (2).
(5) Install the six bolts (12), the six nuts (10) and tighten.
(6) Install the pin (8), the sleeve (13) and the belcrank assy (19).
(7) Lock the nut (14).
(8) Install a new cotter pin (15).
(9) Install the washer (16), the nut (18) and tighten.
(10) Install a new cotter pin (17).
(11) Install the plate (22).
(12) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-003) or BONDING
AND ADHESIVE COMPOUNDS (Material No. 08-007) on the six screws (21).
(13) Install the six screws (21) and tighten them.



EFF :
ALL
 27-21-45


R 
AIJ




Page 418
Feb 01/07

5. Close-up
________
Subtask 27-21-45-420-054
A. Install the cable tension regulator assy (Ref. TASK 27-21-45-400-001).



EFF :
ALL
 27-21-45



AIJ




Page 419
Feb 01/07

QUADRANT - CABLE - REMOVAL/INSTALLATION


_______________________________________
TASK 27-21-46-000-001
Removal of the Cable Quadrant
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

No specific
No specific
No specific
No specific
98A27901002000
98D27207547000
98D27207548000

1
1
1
1
1

circuit breaker(s)
warning notices
ACCESS PLATFORM 2M
ACCESS PLATFORM 6M
PIN,RIGGING-RUDDER
PIN-RIGGING
PIN-RIGGING

safety clip(s)
(6 FT)
(20 FT) - ADJUSTABLE
CONTROL

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire 0.6 mm (0.024 in.)



EFF :
ALL
 27-21-46



AIJ




Page 401
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
52-41-00-010-002
53-32-12-000-002
27-21-46-991-001
27-21-46-991-002
27-21-46-991-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Open the Avionics Compartment Doors for Access
Removal of the Cabin Floor Panels
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-46-991-001, 402/TASK 27-21-46-991-002, 403/TASK
27-21-46-991-003)
Subtask 27-21-46-865-053
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-46-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at zone
325.
(2) Open the access panels 325AL, 325BL at the trailing edge of the
vertical stabilizer.



EFF :
ALL
 27-21-46



AIJ




Page 402
Feb 01/11

R
R

Cable Quadrant
Figure 401/TASK 27-21-46-991-001



EFF :
ALL
 27-21-46



AIJ




Page 403
Feb 01/07

R
R

Location of the Rudder Control Rigging Pin


Figure 402/TASK 27-21-46-991-002



EFF :
ALL
 27-21-46



AIJ




Page 404
Feb 01/07

R
R

Location of the Rigging Pins


Figure 403/TASK 27-21-46-991-003



EFF :
ALL
 27-21-46



AIJ




Page 405
Feb 01/07

(3) Open the access door 312AR.


R

(4) Put the ACCESS PLATFORM 2M (6 FT) under the access door 811.
(5) Open the access door 811 (Ref. TASK 52-41-00-010-002).
(6) Remove the floor panels 241BF, 241FF (Ref. TASK 53-32-12-000-002).
Subtask 27-21-46-860-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configu ration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(7) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(8) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
(9) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(10) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)



EFF :
ALL
 27-21-46



AIJ




Page 406
Feb 01/11

(11) Put the warning notices in position to tell persons not to pressurize
the Green, the Yellow and the Blue hydraulic systems.
R

(12) Put the PIN-RIGGING (98D27207548000) (20) in the bellcrank of the


rudder control unit.

(13) Put the PIN-RIGGING (98D27207547000) (21) in the cable quadrant (1).

(14) Put the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (22) in the


interconnecting lever for the rudder pedals and keep the tension
regulator blocked in the neutral position.
Subtask 27-21-46-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-46-991-001)
Subtask 27-21-46-020-050
A. Removal of the Cable Quadrant
(1) Disconnect the cables (10) from the cable quadrant (1).
WARNING : WEAR GLOVES WHEN YOU TOUCH THE CABLES.
_______
(a) Open the locking clips (30) and turn the turnbuckles (31) until
you can remove the ends of the cables (10) from the levers (3).
(b) Remove the cables (10) from the cable quadrant (1).
(c) Keep the cables (10) clear of the cable quadrant (1).



EFF :
ALL
 27-21-46



AIJ




Page 407
Feb 01/11

(2) Disconnect the control rod (2) from the cable quadrant (1).
(a) Remove and discard the cotter pin (15).
(b) Remove the nut (16) and the washer (17) from the screw (19).
(c) Remove the screw (19).
(d) Move the control rod (2) clear of the lever arm (4).
(e) Safety the bush (18) in the lever arm (4) with lockwire 0.6 mm
(0.024 in.)
(3) Disconnect the cable quadrant (1) from the aircraft structure.
(a) Remove and discard the cotter pins (5).
(b) Remove the nuts (6) and the washers (7) from the screws (8),(9).
(c) Hold the cable quadrant (1) in position.
(d) Remove the screws (8) from the top connection positions.
(e) Remove the screws (9) from the bottom connection positions.
(f) Remove the cable quadrant (1).
NOTE : Identify the screws (8) and the screws (9) for
____
installation in the same positions.



EFF :
ALL
 27-21-46



AIJ




Page 408
Feb 01/07

TASK 27-21-46-400-001
Installation of the Cable Quadrant
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No
No
No
No

specific
specific
specific
specific

R
R
R

98A27901002000
98D27207547000
98D27207548000

warning notices
1 ACCESS PLATFORM 2M (6 FT)
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN,RIGGING-RUDDER CONTROL
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-21-46



AIJ




Page 409
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-005
Material No. 11-002

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------5
15

cotter pins
cotter pin

27-21-04 07 -060
27-21-04 21 -120

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-862-002
27-21-00-820-002
27-24-00-710-001
29-00-00-864-001

R
R

51-75-13-916-002
52-41-00-010-002
52-41-00-410-002
53-32-12-400-002
27-21-46-991-001
27-21-46-991-003

De-energize the Aircraft Electrical Circuits Supplied


from the External Power
Adjustment of the Rudder Control-Cables Length
Operational Test of the Rudder Hydraulic Actuation
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Repair to a layer of Corrosion Preventive Compound
Open the Avionics Compartment Doors for Access
Close the Avionics Compartment Doors after Access
Installation of the Cabin Floor Panels
Fig. 401
Fig. 403



EFF :
ALL
 27-21-46



AIJ




Page 410
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-46-991-001, 403/TASK 27-21-46-991-003)
Subtask 27-21-46-860-051
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the access panels 325AL and 325BL at the trailing edge
of the vertical stabilizer are open.
(3) Make sure that the access door 312AR is open.

(4) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position under the
access door 811.
(5) Make sure that the access door 811 is open (Ref. TASK 52-41-00-010002).
(6) Make sure that the floor panels 241BF and 241FF are removed.
(7) Make sure that the rudder pedals are in the neutral position.
(8) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
(9) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the flight controls.
(10) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(11) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(12) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.



EFF :
ALL
 27-21-46



AIJ




Page 411
Feb 01/11

(13) Make sure that the PIN - RIGGING (98D27207548000) (20) is in position
in the bellcrank of the rudder control unit.
(14) Make sure that the PIN - RIGGING (98D27207547000) (21) is in position
in the cable quadrant (1)
(15) Make sure that PIN - RIGGING, RUDDER CONTROL (98A27901002000) (22) is
in position in the interconnecting lever for the rudder pedals.
Subtask 27-21-46-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-46-991-001)
Subtask 27-21-46-210-050
A. Preparation for Installation
(1) Clean the interface of the aircraft structure at the cable quadrant
position with CLEANING AGENTS (Material No. 11-002) and let it dry.
(2) Examine the work area.
(a) Make sure that:
- the structure,
- the paint work,
- the control rod (2),
- the cables (10),
are clean and show no damage.



EFF :
ALL
 27-21-46


R 
AIJ




Page 412
Feb 01/11

(3) Examine the attachment components.


(a) Make sure that:
- the screws (8),(9),(19),
- the nuts (6),(16),
- the bush (18),
- the eye-end bearing of the control rod (2)
are clean and show no damage.
(4) Apply COMMON GREASE (Material No. 04-004) to the threads of the
screws (8),(9),(19).
(5) Apply COMMON GREASE (Material No. 04-004) to the bush (18).
(6) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-005)
(Ref. TASK 51-75-13-916-002) to the interface of the structure at the
cable quadrant position.
(7) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-005)
(Ref. TASK 51-75-13-916-002) to the interface of the replacement
cable quadrant (1).
(8) Make sure that the rigging pin (21) is installed in the replacement
cable quadrant (1).
Subtask 27-21-46-420-050
B. Installation of the Cable Quadrant
(1) Connect the cable quadrant (1) to the aircraft structure.
(a) Put the cable quadrant (1) in position at the aircraft structure.
(b) Hold the cable quadrant (1) in position.
(c) Install the screws (8) at the top connection positions.
(d) Install the screws (9) at the bottom connection positions.
(e) Install the washers (7) and the nuts (6) on the screws (8),(9).
(f) Tighten the nuts (6).
(g) Safety the nuts (6) with the cotter pins (5).
(2) Connect the control rod (2) to the cable quadrant (1).
(a) Install the bush (18) in the lever arm (4).
(b) Put the control rod (2) in position in the lever arm (4).



EFF :
ALL
 27-21-46


R 
AIJ




Page 413
Feb 01/11

(c) Align the hole in the eye-end bearing of the control rod (2) with
the hole in the lever arm (4).
(d) Install the screw (19).
(e) Install the washer (17) and the nut (16) to the screw (19).
(f) TORQUE the nut (16) to 0.7 m.daN (61.94 lbf.in) and then loosen
it, if necessary, to the next cotter pin hole.
(g) Safety the nut (16) with the cotter pin (15).
(3) Connect the cables (10) to the cable quadrant (1).
(a) Release the cables (10).
(b) Put the cables (10) in position on the cable quadrant (1).
(c) Put the ends of the cables (10) in position in the levers (3).
(d) Make sure that the adjustment of the screws (11) is correct
(Ref. TASK 27-21-00-820-002).
(e) Turn the turnbuckles (31) to apply some tension to the cables
(10).
Subtask 27-21-46-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-46-080-050
D. Preparation for the Test
R

(1) Remove the PIN-RIGGING (98D27207547000) (21) from the cable quadrant.

(2) Remove the PIN-RIGGING (98D27207548000) (20) from the bellcrank of


the rudder control unit.

(3) Remove the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (22) from the


interconnecting lever for the rudder pedals.
(4) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(5) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.



EFF :
ALL
 27-21-46



AIJ




Page 414
Feb 01/11

(6) Do the adjustment of the rudder cable tension (Ref. TASK 27-21-00820-002).
NOTE : Make sure that the locking clips (30) are correctly installed
____
in the turnbuckles (31) after the adjustment of the cable
tension.
Subtask 27-21-46-710-050
E. Do an operational test of the rudder mechanical control (Ref. TASK 27-2400-710-001).
5. Close-up
________
Subtask 27-21-46-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325AL, 325BL.
(3) Close the access door 312AR.
(4) Close the access door 811 (Ref. TASK 52-41-00-410-002).
(5) Install the floor panels 241BF, 241FF (Ref. TASK 53-32-12-400-002).
(6) Remove the warning notice(s).
(7) Remove the access platform(s).



EFF :
ALL
 27-21-46


R 
AIJ




Page 415
Feb 01/07

FRAME - RUDDER CONTROL - REMOVAL/INSTALLATION


_____________________________________________
TASK 27-21-47-000-001
Removal of the Rudder Control Frame
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27207546000
98D27207547000

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 PIN-RIGGING
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire, corrosion-resistant steel dia 0.8 mm


(0.032 in.)



EFF :
ALL
 27-21-47



AIJ




Page 401
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-22-51-000-001
27-23-41-000-001
27-26-41-000-001
27-26-51-000-001
29-00-00-864-001
29-10-00-863-003
53-55-12-000-001
55-33-13-010-002
27-21-47-991-001
27-21-47-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Rudder Trim Actuator (10CC)
Removal of the Artificial Feel and Trim Unit
Removal of the Centering Spring Rod for the Actuator
of the Yaw Damper Servo
Removal of the Yaw Damper Servo Actuator (3CC1) and
(3CC2)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Removal of the Rudder Fairings 325AL and 325AR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-47-991-001)
Subtask 27-21-47-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access door 312AR.
(3) Open the access panels 325BL, 325BR, 325CL (Ref. TASK 55-33-13-010002).
(4) Remove the rudder fairing 325AL (Ref. TASK 53-55-12-000-001).



EFF :
ALL
 27-21-47



AIJ




Page 402
Feb 01/11

R
R

Location of the Rigging Pins and the Attached Components


Figure 401/TASK 27-21-47-991-001



EFF :
ALL
 27-21-47



AIJ




Page 403
Feb 01/07

Subtask 27-21-47-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-47-860-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(7) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(8) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
(9) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.



EFF :
ALL
 27-21-47


R 
AIJ




Page 404
Feb 01/07

(10) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)


(11) Put the warning notices in position to tell persons not to operate
the hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
R

(12) Put the PIN-RIGGING (98D27207546000) (71) in the bellcrank of the


servo actuator 1025GM.

(13) Put the PIN-RIGGING (98D27207547000) (70) in the rudder cable


quadrant.
Subtask 27-21-47-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 402/TASK 27-21-47-991-002)
Subtask 27-21-47-020-050
A. Removal of the Rudder Control Frame
(1) Remove the centering spring rod (6) for the yaw-damper servo
actuators 3CC1, 3CC2 (4) (Ref. TASK 27-26-41-000-001).
(2) Remove the yaw-damper servo actuators 3CC1 and 3CC2 (4) (Ref. TASK
27-26-51-000-001).
(3) Disconnect the electrical connections to:
- the artificial feel and trim unit (8) (Ref. TASK 27-23-41-000-001),
- the rudder trim actuator 10CC (5) (Ref. TASK 27-22-51-000-001).



EFF :
ALL
 27-21-47



AIJ




Page 405
Nov 01/10

R
R

Rudder Control Frame


Figure 402/TASK 27-21-47-991-002



EFF :
ALL
 27-21-47



AIJ




Page 406
Feb 01/07

(4) Disconnect the support beams (52),(53) for the hydraulic pipelines
from the rudder control frame (1).
(a) Remove the nuts (56), the washers (55) and the bolts (54)
connecting the support beam (52) at each side of the rudder
control frame (1).
NOTE : Identify nuts (56), the washers (55) and the bolts (54)
____
removed from the bonding points for installation in the
same positions.
(b) Move the support beam (52) away from the top connection to the
rudder control frame (1).
(c) Remove the nuts (57), the washers (58) and the bolts (59)
connecting the support beam (53) at each side of the rudder
control frame (1).
(d) Move the support beam (53) away from the bottom connection to the
rudder control frame (1).
(e) Safety the support beams (52),(53) clear of the rudder control
frame (1).
NOTE : Do not disconnect the hydraulic pipelines from the support
____
beams (52),(53) unless a repair or a new installation is
necessary.
(5) Disconnect all the brackets and the P-clips which connect:
- the hydraulic pipelines,
- the electrical cables,
to the rudder control frame (1).
(6) Safety the hydraulic pipelines and the electrical cables clear of the
rudder control frame (1).
(7) Disconnect the control rod (2) from the rudder control frame (1).
(a) Remove and discard the cotter pin (31).
(b) Remove the nut (30), the washer (29) and the bolt (26).
(c) Move the eye-end of the control rod (2) clear of the bellcrank
(28) of the rudder control frame (1).
(d) Temporarily safety the sliding bush (27) in the bellcrank (28)
with lockwire, corrosion-resistant steel dia 0.8 mm (0.032 in.).



EFF :
ALL
 27-21-47



AIJ




Page 407
Feb 01/07

(8) Disconnect the control rod (3) from the rudder control frame (1).
(a) Remove and discard the cotter pin (40).
(b) Remove the nut (39), the washer (38) and the bolt (35).
(c) Move the eye-end of the control rod (3) clear of the lever arm
(37) of the rudder control frame (1).
(d) Temporarily safety the sliding bush (36) in the lever arm (37)
with lockwire, corrosion-resistant steel dia 0.8 mm (0.032 in.).
NOTE : Do not disconnect the control rods (50),(51) from the
____
rudder control frame (1) unless a repair or a new
installation is necessary.
(9) Remove the rudder control frame (1).
(a) Disconnect the rudder control frame (1) from the top connection
positions to the structure.
1
_

Remove the screws (32) and the washers (33) from the
connection of the bonding straps (34) to the rudder control
frame (1).

2
_

Move the bonding straps (34) clear of the rudder control frame
(1).
NOTE : Do not disconnect the bonding straps (34) from the
____
structure unless a repair or a new installation is
necessary.

3
_

Remove and discard the cotter pins (20).

4
_

Remove the nuts (21), the washers (22) and the bolts (24).

(b) Disconnect the rudder control frame (1) from the bottom
connection positions to the structure.
1
_

Remove the screws (41) and the washers (42) from the
connection of the bonding straps (43) to the rudder control
frame (1).

2
_

Move the bonding straps (43) clear of the rudder control frame
(1).



EFF :
ALL
 27-21-47



AIJ




Page 408
Feb 01/07

NOTE : Do not disconnect the bonding straps (43) from the


____
structure unless a repair or a new installation is
necessary.
3
_

Remove and discard the cotter pins (44).

4
_

Hold the rudder control frame (1) in position.

5
_

Remove the nuts (45), the washers (46) and the bolts (49).

(c) Move the rudder control frame (1) away from the support brackets
(25) at the top connection positions.
(d) Move the rudder control frame (1) away from the links (47) at the
bottom connection positions.
(e) Remove the rudder control frame (1).
NOTE : Make sure that the control rods (2),(3) and the support
____
beams (52),(53) are clear of the rudder control frame (1).
(f) Temporarily safety the sliding bushes (23) in the rudder control
frame (1) at the top connection positions with lockwire,
corrosion-resistant steel dia 0.8 mm (0.032 in.).
(g) Temporarily safety the sliding bushes (48) in the links with
lockwire, corrosion-resistant steel dia 0.8 mm (0.032 in.).
NOTE : Do not disconnect the links (47) from the support brackets
____
unless a repair or a new installation is necessary.
(10) Remove the artificial feel and trim unit (8) complete with the
solenoid 16CA (7) from the rudder control frame (1) (Ref. TASK 27-2341-000-001).
(11) Remove the rudder trim actuator 10CC (5) from the rudder control
frame (1) (Ref. TASK 27-22-51-000-001).



EFF :
ALL
 27-21-47



AIJ




Page 409
Feb 01/07

TASK 27-21-47-400-001
Installation of the Rudder Control Frame
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-21-47



AIJ




Page 410
Feb 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 PIN-RIGGING
1 PIN-RIGGING

No specific
98D27207546000
98D27207547000

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-002

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-027


Material No. 08-029
Material No. 11-002

RUST INHIBITOR(FOR CORROSION USE 15-004)


(Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------20
31
40
44

cotter
cotter
cotter
cotter

pins
pin
pin
pins

27-21-04
27-21-04
27-21-04
27-21-04



EFF :
ALL
 27-21-47



AIJ




12
22
21
12

-100
-100
-120
-100

Page 411
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-41-00-862-002
27-22-51-400-001
27-23-41-400-001
27-24-00-710-001
27-26-41-400-001
27-26-51-400-001
29-00-00-864-001
53-55-12-000-001
53-55-12-400-001
55-33-13-010-002
55-33-13-410-002
27-21-47-991-001
27-21-47-991-002

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Rudder Trim Actuator (10CC)
Installation of the Artificial Feel and Trim Unit
Operational Test of the Rudder Hydraulic Actuation
Installation of the Centering Spring Rod for the
Actuator of the Yaw Damper Servo
Installation of the Yaw Damper Servo Actuator (3CC1)
and (3CC2)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Rudder Fairings 325AL and 325AR
Installation of the Rudder Fairings 325AL and 325AR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-47-991-001, 402/TASK 27-21-47-991-002)
Subtask 27-21-47-860-053
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the access panels 325BL, 325BR and 325CL are open
(Ref. TASK 55-33-13-010-002).
(3) Make sure that the rudder fairing 325AL is removed (Ref. TASK 53-5512-000-001).



EFF :
ALL
 27-21-47



AIJ




Page 412
Feb 01/11

(4) Make sure that the access door 312AR is open.


(5) Make sure that the rudder pedals are in the neutral position.
(6) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
(7) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the flight controls.
(8) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(9) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(10) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(11) Make sure that the PIN - RIGGING (98D27207546000) (71) is in position
in the bellcrank of the servo actuator 1025GM.
(12) Make sure that the PIN - RIGGING (98D27207547000) (70) is in position
in the rudder cable quadrant.
Subtask 27-21-47-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-47


R 
AIJ




Page 413
Feb 01/07

Subtask 27-21-47-210-050
C. Examination of the Work Area, the Attachment Components and the
Replacement Rudder Control Frame
(1) Clean the interface of the support brackets (25) and the links (47)
with CLEANING AGENTS (Material No. 11-002) and let them dry.
(2) Examine the work area.
(a) Make sure that:
- the structure,
- the paintwork,
- the hydraulic pipelines,
- the electrical cables,
- the control rods (2),(3),
- the bonding straps (34),(43),
- the links (47),
- the support beams (52),(53)
are clean and show no damage.
(3) Examine the attachment components.
(a) Cut and remove the lockwire which temorarily safetied the sliding
bushes (48) in the links (47).
(b) Remove the sliding bushes (48).
(c) Make sure that:
- the nuts (21),(39),(45),(56),(57),
- the bolts (24),(35),(49),(54),(59),
- the screws (32),(41),
- the bushes (48),
are clean and show no damage.
(d) Make sure that the flanged bushes are tight in the links (47).
NOTE : Safety the flanged bushes in the links (47), if necessary,
____
with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029).



EFF :
ALL
 27-21-47


R 
AIJ




Page 414
Feb 01/07

(4) Examine the replacement rudder control frame (1).


(a) Make sure that the rudder control frame (1) is serviceable.
(b) Cut and remove the lockwire which temporarily safetied the
sliding bushes (23) at the top connection positions.
NOTE : The left connection position has one sliding bush (23),
____
the right connection position has two sliding bushes (23).
(c) Cut and remove the lockwire which temporarily safetied the
sliding bush (27) in the bellcrank (28).
(d) Cut and remove the lockwire which temporarily safetied the
sliding bush (36) in the lever arm (37).
(e) Remove the bushes (23),(27),(36).
(f) Make sure that the bushes (23),(27),(36) are clean and show no
damage.
(g) Make sure that the flanged bushes are tight in the attachment
positions, the bellcrank (28) and the lever arm (37).
NOTE : Safety the flanged bushes, if necessary, with BONDING AND
____
ADHESIVE COMPOUNDS (Material No. 08-029).
(h) Make sure that the control rods (50),(51) are correctly connected
to the rudder control frame (1).
(i) Apply COMMON GREASE (Material No. 04-004) to the bearings of the
rudder control frame (1), if necessary.



EFF :
ALL
 27-21-47



AIJ




Page 415
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-21-47-991-002)


Subtask 27-21-47-640-050
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(24),(35),(49),(54),(59) and the screws (32),(41).
(2) Apply COMMON GREASE (Material No. 04-004) to the bushes
(23),(27),(36),(48).
(3) Apply SPECIAL MATERIALS (Material No. 05-002) to the shafts of the
bolts (24),(35),(49),(54),(59).
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the interfaces of
the lever arms (25), the links (47) and the support beams (52),(53).
Subtask 27-21-47-420-050
B. Installation of the Rudder Control Frame
(1) Install the rudder trim actuator 10CC (5) in the rudder control frame
(1) (Ref. TASK 27-22-51-400-001).
(2) Install the artificial feel and trim unit (8) complete with the
solenoid 16CA (7) in the rudder control frame (1) (Ref. TASK 27-2341-400-001).
(3) Make sure that:
- the control rods (2),(3),
- the bonding straps (34),(43),
- the support beams (52),(53),
- the hydraulic pipelines,
- the electrical cables,



EFF :
ALL
 27-21-47



AIJ




Page 416
Feb 01/07

are clear of the installation position for the rudder control frame
(1).
(4) Put the bushes (23) in the top connection positions.
NOTE : Put one bush (23) in the left connection position and two
____
bushes (23) in the right connection position.
(5) Put the sliding bushes (48) in the links (47).
(6) Put the rudder control frame (1) in positon.
(7) Hold the rudder control frame (1) in position with the top connection
positions on the support brackets (25).
(8) Install the bolts (24) at the connections of the rudder control frame
(1) and the support brackets (25).
(9) Put the bottom connection positions in the links (47).
(10) Install the bolts (49) at the connections of the links (47) and the
rudder control frame (1).
(11) Connect the rudder control frame (1) at the top connection positions
to the structure.
(a) Install the washers (22) and the nuts (21) on the bolts (24).
(b) TORQUE the bolts (24) to 1.5 m.daN (11.06 lbf.ft) and then loosen
the nuts (21), if necessary, to the next cotter pin hole.
(c) Safety the nuts (21) with the cotter pins (20).
(d) Put the bonding straps (34) in position at the rudder control
frame (1).
(e) Install the washers (33) and the screws (32) at the connection of
the bonding straps (34) and the rudder control frame (1)
(Ref. TASK 20-28-00-912-004).
(12) Connect the rudder control frame (1) at the bottom connection
positions to the structure.
(a) Install the washers (46) and the nuts (45) on the bolts (49).
(b) TORQUE the bolts (49) to 1.5 m.daN (11.06 lbf.ft) and then loosen
the nuts (45), if necessary, to the next cotter pin hole.



EFF :
ALL
 27-21-47



AIJ




Page 417
Feb 01/07

(c) Safety the nuts (45) with the cotter pins (44).
(d) Put the bonding straps (43) in position at the rudder control
frame (1).
(e) Install the washers (42) and the screws (41) at the connection of
the bonding straps (43) and the rudder control frame (1)
(Ref. TASK 20-28-00-912-004).
(13) Connect the control rod (3) to the rudder control frame (1).
(a) Put the eye-end of the control rod (3) in position at the lever
arm (37).
(b) Put the bush (36) in the lever arm (37).
(c) Install the bolt (35) at the connection of the lever arm (37) and
the control rod (3).
(d) Install the washer (38) and the nut (39) on the bolt (35).
(e) TORQUE the nut (39) to 0.8 m.daN (70.79 lbf.in) and then loosen
it, if necessary, to the next cotter pin hole.
(f) Safety the nut (39) with a new cotter pin (40).
(14) Connect the control rod (2) to the rudder control frame (1).
(a) Put the eye-end of the control rod (2) in position at the
bellcrank (28).
(b) Put the bush (27) in the bellcrank (28).
(c) Install the bolt (26) at the connection of the bellcrank (28) and
the control rod (2).
(d) Install the washer (29) and the nut (30) on the bolt (26).
(e) TORQUE the nut (30) to 0.8 m.daN (70.79 lbf.in) and then loosen
it, if necessary, to the next cotter pin hole.
(f) Safety the nut (30) with a new cotter pin (31).
(15) Install the yaw-damper servo actuators 3CC1 and 3CC2 (4) (Ref. TASK
27-26-51-400-001).



EFF :
ALL
 27-21-47



AIJ




Page 418
Feb 01/07

(16) Install the centering spring rod (6) for the yaw-damper servo
actuator (Ref. TASK 27-26-41-400-001).
(17) Remove the material which safeties the hydraulic pipelines and the
electrical cables clear of the rudder control frame (1).
(18) Connect the support beams (52),(53) for the hydraulic pipelines to
the rudder control frame (1).
NOTE : Make sure that the hydraulic pipelines are correctly installed
____
at the support beams (52),(53).
(a) Remove the material which safeties the support beams (52),(53)
clear of the rudder control frame (1).
(b) Put the brackets of the support beam (53) at the bottom
connection positions at each side of the rudder control frame
(1).
(c) Install the bolts (59), the washers (58) and the nuts (57) at the
connections of the support beam (53) and the rudder control frame
(1).
(d) Put the brackets of the support beam (52) at the top connection
positions at each side of the rudder control frame (1).
(e) Install the bolts (54), the washers (55) and the nuts (56) at the
connections of the support beam (52) and the rudder control frame
(1).
NOTE : Make sure that the bolts (54), the washers (55) and the
____
nuts (56) which were identified, are installed at the
bonding points.
NOTE : Make sure that:
____
- the hydraulic pipelines are not twisted,
- the hydraulic pipelines do not touch any of the
components which move.
(19) Connect the electrical connections to:
- the rudder trim actuator 10CC (5) (Ref. TASK 27-22-51-400-001),
- the artificial feel and trim unit (8) (Ref. TASK 27-23-41-400-001).
(20) Connect the P-clips and the brackets of:
- the hydraulic pipelines,
- the electrical cables,
to the rudder control frame (1).



EFF :
ALL
 27-21-47



AIJ




Page 419
Feb 01/07

Subtask 27-21-47-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-47-860-051
D. Preparation for Test
R

(1) Remove the PIN-RIGGING (98D27207547000) (70) from the rudder cable
quadrant.

(2) Remove the PIN-RIGGING (98D27207546000) (71) from the bellcrank of


the servo actuator 1025GM.
(3) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(4) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.
Subtask 27-21-47-710-050
E. Do an operational test of the rudder mechanical control (Ref. TASK 27-2400-710-001).
5. Close-up
________
Subtask 27-21-47-860-052
A. Put the aircraft back to the serviceable condition.
(1) Apply a layer of SPECIAL MATERIALS (Material No. 05-027) to the
adjacent structure .
(2) Make sure that the drain holes in the adjacent structure are not
blocked.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-21-47



AIJ




Page 420
Nov 01/10

Subtask 27-21-47-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Close the access panels 325BL, 325BR, 325CL (Ref. TASK 55-33-13-410002).
(4) Install the rudder fairing 325AL (Ref. TASK 53-55-12-400-001).
(5) Remove the warning notice(s).
(6) Remove the access platform(s).



EFF :
ALL
 27-21-47


R 
AIJ




Page 421
Feb 01/07

CENTERING ROD - RUDDER CONTROL - REMOVAL/INSTALLATION


_____________________________________________________
TASK 27-21-48-000-001
Removal of the Centering Rod of the Rudder Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27207545000

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire corrosion-resistant steel 0.8 mm (0.032


in.)



EFF :
ALL
 27-21-48



AIJ




Page 401
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
55-33-13-010-002
27-21-48-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-48-991-001)
Subtask 27-21-48-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panel 325DL and remove the access panel 325DR
(Ref. TASK 55-33-13-010-002).
Subtask 27-21-48-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-48



AIJ




Page 402
Feb 01/11

R
R

Centering Rod - Rudder Control


Figure 401/TASK 27-21-48-991-001



EFF :
ALL
 27-21-48



AIJ




Page 403
Feb 01/07

Subtask 27-21-48-860-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(7) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(8) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
(9) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(10) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(11) Put the warning notices in position to tell persons not to operate
the hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
R

(12) Put the PIN-RIGGING (98D27207545000) (20) in the bellcrank assembly


(2) of the travel limitation unit (3).



EFF :
ALL
 27-21-48



AIJ




Page 404
Nov 01/10

Subtask 27-21-48-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-48-991-001)


Subtask 27-21-48-020-050
A. Removal of the Centering Rod
(1) Disconnect the centering rod (1) from the attachment bracket.
(a) Remove and discard the cotter pin (4).
(b) Remove the nut (5), the washer (6) and the bolt (10).
(2) Disconnect the centering rod (1) from the bellcrank assembly (2).
(a) Remove and discard the cotter pin (11).
(b) Hold the centering rod (1) in position.
(c) Remove the nut (12), the washer (13) and the bolt (17).
(3) Remove the centering rod (1).
(a) Move the fork-end of the centering rod (1) clear of the
attachment bracket.
(b) Move the eye-end of the centering rod (1) clear of the lever arm
at the bellcrank assembly (2).
(4) Temporarily safety the sliding bush (7) in the flanged bush (8) at
the fork-end of the centering rod (1) with lockwire corrosionresistant steel 0.8 mm (0.032 in.).



EFF :
ALL
 27-21-48



AIJ




Page 405
Feb 01/07

(5) Temporarily safety the sliding bush (14) in the flanged bush (15) at
the lever arm of the bellcrank assembly (2) with lockwire corrosionresistant steel 0.8 mm (0.032 in.).
NOTE : The flanged bushes (8),(9),(15),(16) are safetied in the lever
____
arm and the fork-end with loctite.



EFF :
ALL
 27-21-48



AIJ




Page 406
Feb 01/07

TASK 27-21-48-400-001
Installation of the Centering Rod of the Rudder Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
98D27207545000

warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING



EFF :
ALL
 27-21-48



AIJ




Page 407
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004
Material No. 05-002
Material No. 08-029
R

lockwire corrosion-resistant steel 0.8 mm (0.032


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
11

cotter pin
cotter pin

27-21-04 11 -050
27-21-04 11 -050

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-862-002
27-24-00-710-001
29-00-00-864-001
55-33-13-010-002
55-33-13-410-002
27-21-48-991-001

De-energize the Aircraft Electrical Circuits Supplied


from the External Power
Operational Test of the Rudder Hydraulic Actuation
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-21-48



AIJ




Page 408
Nov 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-48-991-001)
Subtask 27-21-48-860-052
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the access panel 325DL is open and the access panel
325DR is removed (Ref. TASK 55-33-13-010-002).
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
(5) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(8) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(9) Make sure that the PIN - RIGGING (98D27207545000) (20) is in position
in the bellcrank assembly (2) of the travel limitation unit (3).



EFF :
ALL
 27-21-48



AIJ




Page 409
Feb 01/11

Subtask 27-21-48-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-48-210-050
C. Examination of the Work Area, the Attachment Components and the
Replacement Centering Rod
(1) Examine the work area.
(a) Make sure that:
- the structure,
- the paintwork,
- the bellcrank assembly (2),
- the travel limitation unit (3)
are clean and show no damage.
(b) Make sure that the control rods are correctly installed at the
bellcrank assembly (2) and the travel limitation unit (3).
(c) Make sure that the bellcrank assembly (2) and the travel
limitation unit (3) are correctly installed on the support
bracket.
(2) Examine the attachment components.
(a) Cut and remove the lockwire which temporarily safeties the
sliding bushes (7),(14) in the flanged bushes (8),(15).
(b) Remove the sliding bushes (7),(14).
(c) Make sure that:
- the nuts (5),(12),
- the bushes (7),(8),(9),(14),(15),(16),
- the bolts (10),(17)
are clean and show no damage.



EFF :
ALL
 27-21-48


R 
AIJ




Page 410
Feb 01/07

(d) Make sure that the bushes (15),(16) are tight in the lever arm of
the bellcrank assembly (2).
NOTE : Safety the bushes (15),(16) in the lever arm of the
____
bellcrank assembly (2) if necessary, with BONDING AND
ADHESIVE COMPOUNDS (Material No. 08-029).
(3) Examine the replacement centering rod (1).
(a) Make sure that:
- the centering rod (1) is serviceable,
- the bushes (8),(9) are correctly installed in the fork-end,
- the bushes (8),(9) and the eye-end bearing are clean and show
no damage,
- the drain and vent holes are clean,
- the lock-nut (19) is not safetied to the safety washer (18).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-48-991-001)


Subtask 27-21-48-640-050
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(10),(17).
(2) Apply COMMON GREASE (Material No. 04-004) to the sliding bushes
(7),(14).
(3) Apply SPECIAL MATERIALS (Material No. 05-002) to the shafts of the
bolts (10),(17).



EFF :
ALL
 27-21-48



AIJ




Page 411
Feb 01/07

Subtask 27-21-48-420-050
B. Installation of the Centering Rod
(1) Put the sliding bush (7) in the flanged bush (8) at the fork-end of
the centering rod (1).
(2) Put the fork-end of the centering rod (1) in position on the
attachment bracket.
(3) Install the bolt (10).
(4) Put the sliding bush (14) in the flanged bush (15) at the lever arm
of the bellcrank assembly (2).
(5) Put the eye-end of the centering rod (1) in position in the lever arm
of the bellcrank assembly (2).
(6) Align the hole in the eye-end bearing with the hole in the lever arm
of the bellcrank assembly (2).
(a) Cut and remove the lockwire from the lock-nut (19) and the safety
washer (18).
(b) Release the lock-nut (19).
(c) Turn the eye-end and adjust the length of the centering rod (1)
as necessary.
NOTE : Make sure that the centering rod (1) is in safety (the
____
threads can be seen at the inspection hole).
(d) Put the eye-end of the centering rod (1) in position in the lever
arm.
(e) Make sure that you can install the bolt (17) smoothly.
(f) Do the steps (c),(d) and (e) again if necessary.
(g) Tighten the lock-nut (19).
(h) Install the bolt (17).
(i) Safety the lock-nut (19) to the safety washer (18) with lockwire
corrosion-resistant steel 0.8 mm (0.032 in.).



EFF :
ALL
 27-21-48


R 
AIJ




Page 412
Feb 01/07

(7) Connect the centering rod (1) to the attachment bracket.


(a) Install the washer (6) and the nut (5) on the bolt (10).
(b) TORQUE the nut (5) to 0.7 m.daN (61.94 lbf.in) and then loosen
it, if necessary, to the next cotter pin hole.
(c) Safety the nut (5) with a new cotter pin (4).
(8) Connect the centering rod (1) to the bellcrank assembly (2).
(a) Install the washer (13) and the nut (12) on the bolt (17).
(b) TORQUE the nut (12) to 0.7 m.daN (61.94 lbf.in) and then loosen
it, if necessary, to the next cotter pin hole.
(c) Safety the nut (12) with a new cotter pin (11).
Subtask 27-21-48-860-051
C. Preparation for Test
R

(1) Remove the PIN-RIGGING (98D27207545000) (20) from the bellcrank


assembly.
(2) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(3) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.
Subtask 27-21-48-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-48-710-050
E. Do an operational test of the rudder mechanical control (Ref. TASK 27-2400-710-001).



EFF :
ALL
 27-21-48



AIJ




Page 413
Nov 01/10

5. Close-up
________
Subtask 27-21-48-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325DL and install the access panel 325DR
(Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-21-48


R 
AIJ




Page 414
Feb 01/07

SPRING ROD - REMOVAL/INSTALLATION


_________________________________
TASK 27-21-49-000-001
Removal of the Spring Rod
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27207545000
98D27207546000

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 PIN-RIGGING
1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-21-49



AIJ




Page 401
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------55-33-13-010-002
R

27-21-49-991-001

Opening/Removal of the Trailing Edge Access-Panels


325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
Subtask 27-21-49-865-053
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-49-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows zero.
(5) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch and the OFF legend comes on.



EFF :
ALL
 27-21-49



AIJ




Page 402
Feb 01/07

(6) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch and the OFF legend comes on.
(7) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003)
Subtask 27-21-49-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-21-49-860-051
D. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put the warning notices in position to tell persons not to operate
- the flight controls.
- the Green, the Yellow or the Blue hydraulic systems.
Subtask 27-21-49-010-050
E. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position at the
right side of the vertical stabilizer.
(2) Open the access panel 325CR and remove the access panel 325DR
(Ref. TASK 55-33-13-010-002).



EFF :
ALL
 27-21-49



AIJ




Page 403
Feb 01/11

Subtask 27-21-49-480-050
F. Installation of the Rigging Pins
R

(1) Put the PIN-RIGGING (98D27207546000) (22) in the bellcrank assembly


of the servo control 1025GM (1).

(2) Put the PIN-RIGGING (98D27207545000) (21) in the bellcrank assembly


of the travel limitation unit 4CC.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-49-991-001)
Subtask 27-21-49-020-050
A. Removal of the Spring Rod
NOTE : Identify the position of the spring rod (3) so that it will be
____
installed in the same direction.
(1) Remove the spring rod (3) from the input lever (2) as follows:
(a) Remove and discard the cotter pin (11).
(b) Remove the nut (10), the washer (9), the bush (6) and the bolt
(5).
(c) Move the end of the spring rod (3) clear of the input lever (2).
(2) Disconnect the spring rod (3) from the lever shaft (4) as follows:
(a) Remove and discard the cotter pin (18).
(b) Remove the nut (17) and the washer (16) from the bolt (12).
(c) Hold the spring rod (3) and remove the bolt (12) with the bush
(13) from the lever shaft (4).
(d) Move the spring rod (3) clear of the lever shaft (4).



EFF :
ALL
 27-21-49



AIJ




Page 404
Nov 01/10

R
R

Spring Rod
Figure 401/TASK 27-21-49-991-001



EFF :
ALL
 27-21-49



AIJ




Page 405
Feb 01/07

TASK 27-21-49-400-001
Installation of the Spring Rod
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R

98D27207545000
98D27207546000

warning notices
access platform 11.0 m (36 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-21-49



AIJ




Page 406
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004
Material No. 05-002

lockwire corrosion-resistant steel 0.8 mm (0.032


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-027


Material No. 08-029
R

RUST INHIBITOR(FOR CORROSION USE 15-004)


(Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------11
18

cotter pin
cotter pin

27-21-04 08 -050
27-21-04 08 -050

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-00-710-002
27-24-51-400-001
29-00-00-864-001
55-33-13-010-002
55-33-13-410-002
27-21-49-991-001

Operational Test of the Rudder Servocontrols with


Individual Hydraulic System
Installation of the Rudder Servo Control
1025GM/2025GM/3025GM
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-21-49



AIJ




Page 407
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-49-991-002

Fig. 402

3. __________
Job Set-up
Subtask 27-21-49-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(7) Make sure that the access platform in position.
(8) Make sure that the access panel 325CR is open (Ref. TASK 55-33-13010-002).
(9) Make sure that the access panel 325DR is removed (Ref. TASK 55-33-13010-002).
R

(10) Make sure that the PIN-RIGGING (98D27207546000) (22) is in the


bellcrank assembly of the servo control 1025GM (1).

(11) Make sure that the PIN-RIGGING (98D27207545000) (21) is in the


bellcrank assembly of the travel limitation unit 4CC.



EFF :
ALL
 27-21-49



AIJ




Page 408
Nov 01/10

Subtask 27-21-49-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-49-991-001)


Subtask 27-21-49-910-050
A. Preparation for the Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the structure, the paintwork, the servo controls (1)
and the lever shafts (4) are clean and show no damage.
(2) Make sure that the bolts (5),(12), the bushes (6),(13) and the nuts
(10),(17) are clean and show no damage.
(3) Make sure that the bushes (7),(8),(14),(15) are not damaged and are
tight in the input lever (2) and in the lever shaft (4).
NOTE : Safety the bushes (7),(8),(14),(15) in the input lever (2) and
____
the lever shaft (4) with BONDING AND ADHESIVE COMPOUNDS
(Material No. 08-029), if necessary.



EFF :
ALL
 27-21-49



AIJ




Page 409
Feb 01/07

(4) Do a check of the replacement spring rod (3) to make sure that the
specified length of 232.0 mm (9.1338 in.) and the break-out load of
15.0 +2.0 -2.0 daN (33.7213 +4.4961 -4.4961 lbf) is correct.
(5) Examine the replacement spring rod (3) to make sure that the drainage
holes and the thread inspection holes are clean.
(6) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(5),(12) and to the bushes (6),(13).
(7) Apply SPECIAL MATERIALS (Material No. 05-002) to the shafts of the
bolts (5),(12).
Subtask 27-21-49-420-050
B. Installation of the Spring Rod
(1) Attach the spring rod (3) on the lever shaft (4) as follows:
(a) Move the bush (13) in the bush (14) of the lever shaft (4).
(b) Put the rod end of the spring rod (3) in the arm of the lever
shaft (4).
NOTE : Make sure that the spring rod (3) is installed in the
____
direction identified during the removal.
(c) Attach the spring rod (3) to the lever shaft (4) with the bolt
(12) the washer (16) and the nut (17).
(2) Install the spring rod (3) to the input lever (2) as follows:
(a) Move the bush (6) in the bush (7) of the input lever (2).
(b) Put the rod end of the spring rod (3) in the input lever (2) and
install the bolt (5).
(3) If you can not install the bolt (5) adjust the length of the spring
rod (3) as follows:
(a) Release the locknut (19) of the spring rod (3).
(b) Turn the body of the spring rod (3) until you can install the
bolt (5).
(c) Make sure that the inspection holes are blocked by the threads of
the rod end.



EFF :
ALL
 27-21-49


R 
AIJ




Page 410
Feb 01/07

(d) Tighten the locknuts (19) and safety them to the safety washers
(20) with lockwire corrosion-resistant steel 0.8 mm (0.032 in.).
(4) Install the washer (9) and the nut (10) on the bolt (5).
(5) TORQUE the nuts (10) and (17) to 0.8 m.daN (70.79 lbf.in) and then
loosen them, if necessary, to the next cotter pin hole.
(6) Safety the nut (10) with a new cotter pin (11).
(7) Safety the nut (17) with a new cotter pin (18).
Subtask 27-21-49-080-050
C. Removal of the Rigging Pins
(Ref. Fig. 402/TASK 27-21-49-991-002)
R

(1) Remove the PIN-RIGGING (98D27207545000) (21) from the bellcrank


assembly of the travel limitation unit 4CC.

(2) Remove the PIN-RIGGING (98D27207546000) (22) from the bellcrank


assembly of the servo control 1025GM.
Subtask 27-21-49-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-49-860-054
E. Preparation for the Test
(1) Push the FLT CTL/FAC 1 pushbutton switch on the overhead panel 23VU
and the OFF legend goes off.
(2) Push the FLT CTL/FAC 2 pushbutton switch on the overhead panel 24VU
and the OFF legend goes off.
Subtask 27-21-49-710-050
F. Do an operational test of the rudder servo controls (Ref. TASK 27-24-00710-002).
Subtask 27-21-49-820-050
G. Adjust the spring rod (3) if necessary: (Ref. TASK 27-24-51-400-001).



EFF :
ALL
 27-21-49



AIJ




Page 411
Nov 01/10

R
R

Rigging Pin Locations


Figure 402/TASK 27-21-49-991-002



EFF :
ALL
 27-21-49



AIJ




Page 412
Feb 01/07

5. Close-up
________
Subtask 27-21-49-860-055
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Apply a layer of SPECIAL MATERIALS (Material No. 05-027) to the
adjacent structure.
(3) Make sure that the drain holes in the adjacent structure are not
blocked.
Subtask 27-21-49-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325CR and install the access panel 325DR
(Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-21-49


R 
AIJ




Page 413
Feb 01/07

SPRING ROD - INSPECTION/CHECK


_____________________________
TASK 27-21-49-200-001
Check of the Actuating Spring Rod
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-10
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R

No
No
No
No
No

specific
specific
specific
specific
specific

1
1
1
1

ACCESS PLATFORM 6M (20 FT)


CALIPER
WARNING NOTICE(S)
TIE WRAP
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------9
13

cotter pin
cotter pin

27-21-04 08 -050
27-21-04 22 -100



EFF :
ALL
 27-21-49



AIJ




Page 601
May 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-21-49-000-001
27-21-49-400-001
27-24-00-710-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
55-33-13-010-002
55-33-13-410-002
R

27-21-49-991-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Spring Rod
Installation of the Spring Rod
Operational Test of the Rudder Servocontrols with
Individual Hydraulic System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 601

3. __________
Job Set-up
Subtask 27-21-49-865-054
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-49



AIJ




Page 602
Feb 01/07

Subtask 27-21-49-860-056
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows zero.
(5) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. Make sure that the OFF legend comes on.
(6) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. Make sure that the OFF legend comes on.
(7) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
Subtask 27-21-49-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-21-49


R 
AIJ




Page 603
Nov 01/10

Subtask 27-21-49-860-057
D. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
R

(2) Put the WARNING NOTICE(S) in position to tell persons not to operate:
- The flight controls
- The Green, the Yellow or the Blue hydraulic systems.
Subtask 27-21-49-010-051
E. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) in position at the right side of
the vertical stabilizer.
(2) Open the access panel 325CR and remove the access panel 325BR
(Ref. TASK 55-33-13-010-002).
4. Procedure
_________
Subtask 27-21-49-280-050
A. Measurement of the Control Rods
(Ref. Fig. 601/TASK 27-21-49-991-003)
(1) Disconnect the control rod (4):
(a) Remove and discard the cotter pin (13).
(b) Remove the nut (14), the washer (15), the bolt (11) and the bush
(12).
(2) Check of the spring rod (3):
CAUTION : WHEN YOU DISCONNECT THE SPRING RODS, MAKE SURE THAT THE
_______
BEND ANGLE OF THE BEARING OF THE EYE-ENDS IS NOT MORE THAN
8 DEG.
IF THE BEND ANGLE IS MORE THAN 8 DEG., DAMAGE CAN OCCUR TO
THE PROTECTION FLANGE OF THE BEARING OR TO THE BEARING
ITSELF.
NOTE : The spring rod which is checked must remain connected. The
____
other two spring rods must be disconnected during the check.



EFF :
ALL
 27-21-49



AIJ




Page 604
Nov 01/10

(a) Disconnect the spring rods (1) and (2):


1
_

Remove and discard the cotter pins (9).

2
_

Remove the nuts (8), the washers (7), the bolts (5) and the
distance bushes (6).

3
_

Temporarily attach the spring rods (1) and (2) to the adjacent
structure with a TIE WRAP.

(b) Do a check of the spring rod (3):


R

NOTE : It is recommended that you use a CALIPER to measure the


____
dimension X.
1
_

Measure the dimension X of the spring rod (3). Record this
value as the value X1.

2
_

Push the control rod (4) until the spring rod (3) moves to its
inner stop.

3
_

Release the control rod (4).

4
_

Measure the dimension X of the spring rod (3) again. Record
this value as the value X2.

5
_

Pull the control rod (4) until the spring rod (3) moves to its
inner stop.

6
_

Release the control rod (4).

7
_

Measure the dimension X of the spring rod (3) again. Record
this value as the value X3.

8
_

Add the values X1, X2 and X3 and divide by 3. Record the
result as value X4.

9
_

If one or more of the measured values X1, X2 or X3 is


outside the calculated value of X4, plus a tolerance of 0 0.2 +0.2 MM (0.0000 -0.0078 +0.0078 IN.):
- Replace the spring rod (3) (Ref. TASK 27-21-49-000-001) and
(Ref. TASK 27-21-49-400-001).

(c) Connect the spring rods (1) and (2):


1
_

Remove the TIE WRAP from the structure and the spring rods (1)
and (2).



EFF :
ALL
 27-21-49



AIJ




Page 605
May 01/11

R
R

Spring Rod
Figure 601/TASK 27-21-49-991-003- 12 (SHEET 1)



EFF :
ALL
 27-21-49



AIJ




Page 606
Feb 01/07

R
R

Spring Rod
Figure 601/TASK 27-21-49-991-003- 22 (SHEET 2)



EFF :
ALL
 27-21-49



AIJ




Page 607
Feb 01/07

2
_

Put the rod ends of the spring rods (1) and (2) into the lever
of the drive shaft (10).

3
_

Install the distance bushes (6), the bolts (5), the washers
(7) and the nuts (8).

4
_

TORQUE the nuts (8) to between 0.7 and 0.8 m.daN (61.94 and
70.79 lbf.in).

5
_

Safety the nuts (8) with the new cotter pin (9).

(3) Check of the spring rod (2):


CAUTION : WHEN YOU DISCONNECT THE SPRING RODS, MAKE SURE THAT THE
_______
BEND ANGLE OF THE BEARING OF THE EYE-ENDS IS NOT MORE THAN
8 DEG.
IF THE BEND ANGLE IS MORE THAN 8 DEG., DAMAGE CAN OCCUR TO
THE PROTECTION FLANGE OF THE BEARING OR TO THE BEARING
ITSELF.
NOTE : The spring rod which is checked must remain connected. The
____
other two spring rods must be disconnected during the check.
(a) Disconnect the spring rods (1) and (3):
1
_

Remove and discard the cotter pins (9).

2
_

Remove the nuts (8), the washers (7), the bolts (5) and the
distance bushes (6).

3
_

Temporarily attach the spring rods (1) and (3) to the adjacent
structure with a TIE WRAP.

(b) Do a check of the spring rod (2):


R

NOTE : It is recommended that you use a CALIPER to measure the


____
dimension X.
1
_

Measure the dimension X of the spring rod (2). Record this
value as the value X1.

2
_

Push the control rod (4) until the spring rod (2) moves to its
inner stop.

3
_

Release the control rod (4).



EFF :
ALL
 27-21-49



AIJ




Page 608
May 01/11

4
_

Measure the dimension X of the spring rod (2) again. Record
this value as the value X2.

5
_

Pull the control rod (4) until the spring rod (2) moves to its
inner stop.

6
_

Release the control rod (4).

7
_

Measure the dimension X of the spring rod (2) again. Record
this value as the value X3.

8
_

Add the values X1, X2 and X3 and divide by 3. Record the
result as value X4.

9
_

If one or more of the measured values X1, X2 or X3 is


outside the calculated value of X4, plus a tolerance of 0 0.2 +0.2 MM (0.0000 -0.0078 +0.0078 IN.):
- Replace the spring rod (2) (Ref. TASK 27-21-49-000-001) and
(Ref. TASK 27-21-49-400-001).

(c) Connect the spring rods (1) and (3):


1
_

Remove the TIE WRAP from the structure and the spring rods (1)
and (3).

2
_

Put the rod ends of the spring rods (1) and (3) into the lever
of the drive shaft (10).

3
_

Install the distance bushes (6), the bolts (5), the washers
(7) and the nuts (8).

4
_

TORQUE the nuts (8) to between 0.7 and 0.8 m.daN (61.94 and
70.79 lbf.in).

5
_

Safety the nuts (8) with the new cotter pin (9).

(4) Check of the spring rod (1):


CAUTION : WHEN YOU DISCONNECT THE SPRING RODS, MAKE SURE THAT THE
_______
BEND ANGLE OF THE BEARING OF THE EYE-ENDS IS NOT MORE THAN
8 DEG.
IF THE BEND ANGLE IS MORE THAN 8 DEG., DAMAGE CAN OCCUR TO
THE PROTECTION FLANGE OF THE BEARING OR TO THE BEARING
ITSELF.
NOTE : The spring rod which is checked must remain connected. The
____
other two spring rods must be disconnected during the check.



EFF :
ALL
 27-21-49


R 
AIJ




Page 609
Nov 01/10

(a) Disconnect the spring rods (2) and (3):


1
_

Remove and discard the cotter pins (9).

2
_

Remove the nuts (8), the washers (7), the bolts (5) and the
distance bushes (6).

3
_

Temporarily attach the spring rods (2) and (3) to the adjacent
structure with a TIE WRAP.

(b) Do a check of the spring rod (1):


R

NOTE : It is recommended that you use a CALIPER to measure the


____
dimension X.
1
_

Measure the dimension X of the spring rod (1). Record this
value as the value X1.

2
_

Push the control rod (4) until the spring rod (1) moves to its
inner stop.

3
_

Release the control rod (4).

4
_

Measure the dimension X of the spring rod (1) again. Record
this value as the value X2.

5
_

Pull the control rod (4) until the spring rod (1) moves to its
inner stop.

6
_

Release the control rod (4).

7
_

Measure the dimension X of the spring rod (1) again. Record
this value as the value X3.

8
_

Add the values X1, X2 and X3 and divide by 3. Record the
result as value X4.

9
_

If one or more of the measured values X1, X2 or X3 is


outside the calculated value of X4, plus a tolerance of 0 0.2 +0.2 MM (0.0000 -0.0078 +0.0078 IN.):
- Replace the spring rod (1) (Ref. TASK 27-21-49-000-001) and
(Ref. TASK 27-21-49-400-001).

(c) Connect the spring rods (2) and (3):


1
_

Remove the TIE WRAP from the structure and the spring rods (2)
and (3).



EFF :
ALL
 27-21-49



AIJ




Page 610
May 01/11

2
_

Put the rod ends of the spring rods (2) and (3) into the lever
of the drive shaft (10).

3
_

Install the distance bushes (6), the bolts (5), the washers
(7) and the nuts (8).

4
_

TORQUE the nuts (8) to between 0.7 and 0.8 m.daN (61.94 and
70.79 lbf.in).

5
_

Safety the nuts (8) with the new cotter pin (9).

(5) Installation of the control rod (4):


(a) Put the rod (4) into the differential lever (16) of the rudder
control unit.
(b) Install the distance bush (12), the bolt (11), the washer (15),
and the nut (14).
(c) TORQUE the nut (14) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(d) Safety the nut (14) with the new cotter pin (13).
5. Close-up
________
Subtask 27-21-49-865-056
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-49-710-051
B. Do the operational test of the rudder servo controls (Ref. TASK 27-24-00710-002).
Subtask 27-21-49-410-051
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325CR and install the access panel 325BR
(Ref. TASK 55-33-13-410-002).



EFF :
ALL
 27-21-49


R 
AIJ




Page 611
Nov 01/10

(3) Remove the warning notice(s).


(4) Remove the access platform(s).
(5) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-21-49


R 
AIJ




Page 612
Nov 01/10

LINKAGE - RUDDER CONTROL - REMOVAL/INSTALLATION


_______________________________________________
TASK 27-21-52-000-001
Removal of the Rudder Control Rods
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No specific
No specific
No specific
98D27207545000
98D27207547000
98D27207548000

1
1
1
1
1

adhesive tape
ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE
WARNING NOTICE(S)
PIN-RIGGING
PIN-RIGGING
PIN-RIGGING



EFF :
ALL
 27-21-52



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
53-55-12-000-001
55-33-13-010-001
27-21-52-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Removal of the Rudder Fairings 325AL and 325AR
Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Fig. 401

3. __________
Job Set-up
Subtask 27-21-52-010-050
A. Get Access
(1) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position.
(2) Open the access door 312AR.
(3) Remove the rudder fairing 325AL (Ref. TASK 53-55-12-000-001).
(4) Open the access panels 325BL, 325BR, 325CL, 325DL (Ref. TASK 55-3313-010-001).
Subtask 27-21-52-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Blue hydraulic system with the electric pump
(Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-21-52



AIJ




Page 402
Feb 01/07

(3) Put the rudder pedals in the neutral position.


(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
R

(7) Put the WARNING NOTICE(S) in position to tell persons not to operate
the hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(8) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(9) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.

(10) Put the WARNING NOTICE(S) in the cockpit to tell persons not to
operate the flight controls.
(11) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)

(12) Put the PIN-RIGGING (98D27207545000) (11) in the bellcrank assembly


of the travel limitation unit (12).

(13) Put the PIN-RIGGING (98D27207548000) (1) in the bellcrank of the


rudder control unit (2).

(14) Put the PIN-RIGGING (98D27207547000) (3) in the bellcrank of the


rudder cable quadrant (4).



EFF :
ALL
 27-21-52



AIJ




Page 403
Nov 01/10

Subtask 27-21-52-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-21-52-991-001)


Subtask 27-21-52-020-050
A. Removal of the Rudder Control Rod (5)
(1) Removal of the half-clamps (32):
(a) Remove and discard the cotter-pin (35).
(b) Hold the half-clamps (32) and the spacer-tube (33).
(c) Remove the nut (34), the bolt (30) and the washers (31).
(d) Remove the spacer-tube (33) and the half-clamps (32).
(2) Disconnect the rudder control rod (7):
(a) Remove and discard the cotter-pin (25).
(b) Remove the nut (26) and the washer (27).
(c) Hold the rudder control rod (7) and remove the bolt (29).
(d) Disconnect the rudder control rod (7) from the rudder control rod
(5) and safety the rod (7) with the adhesive tape.
(3) Removal of the rudder control rod (5):
(a) Remove and discard the cotter-pin (19).
(b) Remove the nut (20) and the washer (21).



EFF :
ALL
 27-21-52



AIJ




Page 404
Nov 01/10

(c) Remove the bolt (24).


(d) Remove and discard the cotter-pin (13).
(e) Remove the nut (14) and the washer (15).
(f) Hold the rudder control rod (5) and remove the bolt (17).
(g) Remove the rudder control rod (5) from the bellcranks (23) and
(16).
Subtask 27-21-52-020-051
B. Removal of the Rudder Control Rod (6)
(1) Removal of the half-clamps (32):
(a) Remove and discard the cotter-pin (35).
(b) Hold the half-clamps (32) and the spacer-tube (33).
(c) Remove the nut (34), the bolt (30) and the washers (31).
(d) Remove the spacer-tube (33) and the half-clamps (32).
(2) Disconnect the rudder control rod (8):
(a) Remove and discard the cotter-pin (45).
(b) Remove the nut (46) and the washer (47).
(c) Hold the rudder control rod (8) and remove the bolt (49).
(d) Disconnect the rudder control rod (8) from the rudder control rod
(6) and safety the rudder control rod (8) with the adhesive tape.
(3) Removal of the rudder control rod (6):
(a) Remove and discard the cotter-pin (41).
(b) Remove the nut (42) and the washer (43).
(c) Remove the bolt (50).
(d) Remove and discard the cotter-pin (36).
(e) Remove the nut (37) and the washer (38).



EFF :
ALL
 27-21-52



AIJ




Page 405
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 17 (SHEET 1)


EFF :
ALL
 27-21-52



AIJ




Page 406
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 27 (SHEET 2)


EFF :
ALL
 27-21-52



AIJ




Page 407
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 37 (SHEET 3)


EFF :
ALL
 27-21-52



AIJ




Page 408
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 47 (SHEET 4)


EFF :
ALL
 27-21-52



AIJ




Page 409
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 57 (SHEET 5)


EFF :
ALL
 27-21-52



AIJ




Page 410
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 67 (SHEET 6)


EFF :
ALL
 27-21-52



AIJ




Page 411
Feb 01/07

Rudder Control Rods


Figure 401/TASK 27-21-52-991-001- 77 (SHEET 7)


EFF :
ALL
 27-21-52



AIJ




Page 412
Feb 01/07

(f) Hold the rudder control rod (6) and remove the bolt (52).
(g) Remove the rudder control rod (6) from the bellcranks (39) and
(51).
Subtask 27-21-52-020-052
C. Removal of the Rudder Control Rod (7)
(1) Removal of the half-clamps (32):
(a) Remove and discard the cotte- pin (35).
(b) Hold the half-clamps (32) and the spacer-tube (33).
(c) Remove the nut (34), the bolt (30) and the washers (31).
(d) Remove the spacer-tube (33) and the half-clamps (32).
(2) Removal of the rudder control rod (7):
(a) Remove and discard the cotter-pin (62).
(b) Remove the nut (61) and the washer (60).
(c) Remove the bolt (58).
(d) Remove and discard the cotter-pin (53).
(e) Remove the nut (54) and the washer (55).
(f) Hold the rudder control rod (7) and remove the bolt (63).
(g) Remove the rudder control rod (7) from the bellcrank (59) and the
rudder control rod (5).
Subtask 27-21-52-020-053
D. Removal of the Rudder Control Rod (8)
(1) Removal of the half-clamps (32):
(a) Remove and discard the cotter-pin (35).
(b) Hold the half-clamps (32) and the spacer-tube (33).
(c) Remove the nut (34), the bolt (30) and the washers (31).



EFF :
ALL
 27-21-52



AIJ




Page 413
Feb 01/07

(d) Remove the spacer-tube (33) and the half-clamps (32).


(2) Disconnect the rudder control rod (9):
(a) Remove and discard the cotter-pin (78).
(b) Remove the nut (79) and the washer (80).
(c) Hold the control rod (9) and remove the bolt (81).
(d) Disconnect the rudder control rod (9) from the rudder control rod
(8) and safety the rudder control rod (9) with the adhesive tape.
(3) Removal of the control rod (8):
(a) Remove and discard the cotter-pin (74).
(b) Remove the nut (75) and the washer (76).
(c) Remove the bolt (82).
(d) Remove and discard the cotter-pin (70).
(e) Remove the nut (71) and the washer (72).
(f) Hold the rudder control rod (8) and remove the bolt (84).
(g) Remove the rudder control rod (8) from the bellcrank (83) and the
rudder control rod (6).
Subtask 27-21-52-020-054
E. Removal of the Rudder Control Rod (9)
(1) Remove the rudder control rod (9) as follows:
(a) Remove and discard the cotter-pin (99).
(b) Remove the nut (98) and the washer (97).
(c) Remove the bolt (95).
(d) Remove and discard the cotter-pin (90).
(e) Remove the nut (91) and the washer (92).
(f) Hold the rudder control rod (9) and remove the bolt (100).



EFF :
ALL
 27-21-52



AIJ




Page 414
Feb 01/07

(g) Remove the rudder control rod (9) from the bellcrank (96) and the
rudder control rod (8).
Subtask 27-21-52-020-055
F. Removal of the Rudder Control Rod (10)
(1) Remove the rudder control rod (10) as follows:
(a) Remove and discard the cotter-pin (120).
(b) Remove the nut (119) and the washer (118).
(c) Remove the bolt (116).
(d) Remove and discard the cotter-pin (110).
(e) Remove the nut (111) and the washer (112).
(f) Hold the rudder control rod (10) and remove the bolt (121).
(g) Remove the rudder control rod (10) from the bellcranks (113) and
(117).



EFF :
ALL
 27-21-52



AIJ




Page 415
Feb 01/07

TASK 27-21-52-400-001
Installation of the Rudder Control Rods
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

R
R
R

98D27207545000
98D27207547000
98D27207548000

1 ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE


1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING
1 PIN-RIGGING
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-21-52



AIJ




Page 416
Nov 01/10

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------13
19
25
35
35
36
41
45
53
62
70
74
78
78
90
99
110
120

cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin
cotter-pin

27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04
27-21-04

22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22

-100
-100
-100
-280
-280A
-100
-100
-100
-100
-100
-100
-100
-280
-280A
-100
-100
-100
-100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-862-002
24-42-00-862-001
27-24-00-710-001
29-00-00-864-001
53-55-12-000-001
53-55-12-400-001
55-33-13-010-001
55-33-13-410-001
27-21-52-991-001

De-energize the Aircraft Electrical Circuits Supplied


from the External Power
De-energize the Ground Service Network Supplied from
the External Power
Operational Test of the Rudder Hydraulic Actuation
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Rudder Fairings 325AL and 325AR
Installation of the Rudder Fairings 325AL and 325AR
Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-21-52



AIJ




Page 417
Feb 01/07

3. __________
Job Set-up
Subtask 27-21-52-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the rudder fairing 325AL is removed (Ref. TASK 53-5512-000-001)
(3) Make sure that the access panels 325BL, 325BR, 325CL and 325DL are
open (Ref. TASK 55-33-13-010-001).
(4) Make sure that the access door 312AR is open.
(5) Make sure that the rudder pedals are in the neutral position.
(6) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU, shows 0.
(7) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the flight controls.
(8) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(9) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
R

(10) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
system:
- in the cockpit on the hydraulic section 40VU of the overhead panel
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(11) Make sure that the PIN - RIGGING (98D27207545000) (11) is in position
in the bellcrank assembly of the travel limitation unit (12).
(12) Make sure that the PIN - RIGGING (98D27207548000) (1) is in position
in the bellcrank assembly of the rudder control unit (2).
(13) Make sure that the PIN - RIGGING (98D27207547000) (3) is in position
in the bellcrank assembly of the rudder cable quadrant (4).



EFF :
ALL
 27-21-52



AIJ




Page 418
Nov 01/10

Subtask 27-21-52-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-52-991-001)
Subtask 27-21-52-420-050
A. Installation of the Rudder Control Rod (5)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) If, during the installation of the rudder control rod (5), you cannot
install the bolts (17) and (24) easily, do the steps that follow:
(a) Cut, remove and discard the lockwire from the nuts (18) and (22)
and from the rudder control rod (5).
(b) Loosen the nuts (18) and (22) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rudder control
rod (5) until you can install the bolts (17) and (24).
(d) TORQUE the nuts (18) and (22) to between 0.7 and 1.0 m.daN (61.94
and 88.49 lbf.in).
(e) Safety the nuts (18) and (22) with the lockwire MISCELLANEOUS
(Material No. 19-010).



EFF :
ALL
 27-21-52



AIJ




Page 419
Feb 01/07

(2) Installation of the rudder control rod (5):


(a) Put the rudder control rod (5) in the installation position.
(b) Install the bolt (17), the washer (15) and the nut (14).
(c) TORQUE the nut (14) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (14) with the new cotter-pin (13).
(e) Install the bolt (24) with the washer (21) and the nut (20).
(f) TORQUE the nut (20) to 0.7 m.daN (61.94 lbf.in).
(g) Safety the nut (20) with the new cotter-pin (19).
(3) Connect the rudder control rod (7):
(a) Remove the adhesive tape from the rudder control rod (7).
(b) Put the rudder control rod (7) in the installation position.
(c) Install the bolt (29), the washer (27) and the nut (26).
(d) TORQUE the nut (26) to 0.7 m.daN (61.94 lbf.in).
(e) Safety the nut (26) with the new cotter-pin (25).
(4) Installation of the half-clamps (32):
(a) Put the half-clamps (32) and the spacer-tube (33) in position.
(b) Install the bolt (30), the washers (31) and the nut (34).
(c) TORQUE the nut (34) to 0.43 m.daN (38.05 lbf.in).
(d) Safety the nut (34) with the new cotter-pin (35).
Subtask 27-21-52-420-051
B. Installation of the Rudder Control Rod (6)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.



EFF :
ALL
 27-21-52



AIJ




Page 420
Feb 01/07

(1) If, during the installation of the rudder control rod (6), you cannot
install the bolts (50) and (52) easily, do the steps that follow:
(a) Cut, remove and discard the lockwire from the nuts (40) and (44)
and from the rudder control rod (6).
(b) Loosen the nuts (40) and (44) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rudder control
rod (6) until you can install the bolts (50) and (52).
(d) TORQUE the nuts (40) and (44) to between 0.7 and 1.0 m.daN (61.94
and 88.49 lbf.in).
(e) Safety the nuts (40) and (44) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(2) Installation of the rudder control rod (6):
(a) Put the rudder control rod (6) in the installation position on
the bellcranks (39) and (51).
(b) Install the bolt (52), the washer (38) and the nut (37).
(c) TORQUE the nut (37) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (37) with the new cotter-pin (36).
(e) Install the bolt (50), the washer (43) and the nut (42).
(f) TORQUE the nut (42) to 0.7 m.daN (61.94 lbf.in).
(g) Safety the nut (42) with the new cotter-pin (41).
(3) Connect the control rod (8):
(a) Remove the adhesive tape from the rudder control rod (8).
(b) Put the control rod (8) in the installation position on the
rudder control rod (6).
(c) Install the bolt (49), the washer (47) and the nut (46).
(d) TORQUE the nut (46) to 0.7 m.daN (61.94 lbf.in).
(e) Safety the nut (46) with the new cotter-pin (45).



EFF :
ALL
 27-21-52



AIJ




Page 421
Feb 01/07

(4) Installation of the half-clamps (32):


(a) Put the half-clamps (32) and the spacer-tube (33) in position.
(b) Install the bolt (30), the washers (31) and the nut (34).
(c) TORQUE the nut (34) to 0.43 m.daN (38.05 lbf.in).
(d) Safety the nut (34) with the new cotter-pin (35).
Subtask 27-21-52-420-052
C. Installation of the Rudder Control Rod (7)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) If, during the installation of the rudder control rod (7), you cannot
install the bolts (58) and (63) easily, do the steps that follow:
(a) Cut, remove and discard the lockwire from the nuts (56) and (57)
and from the rudder control rod (7).
(b) Loosen the nuts (56) and (57) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rudder control
rod (7) until you can install the bolts (58) and (63).
(d) TORQUE the nuts (56) and (57) to between 0.7 and 1.0 m.daN (61.94
and 88.49 lbf.in).
(e) Safety the nuts (56) and (57) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(2) Installation of the rudder control rod (7):
(a) Put the control rod (7) in the installation position on the
rudder control rod (5) and the bellcrank (59).
(b) Install the bolt (63), the washer (55) and the nut (54).
(c) TORQUE the nut (54) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (54) with the new cotter-pin (53).
(e) Install the bolt (58), the washer (60) and the nut (61).



EFF :
ALL
 27-21-52



AIJ




Page 422
Feb 01/07

(f) TORQUE the nut (61) to 0.7 m.daN (61.94 lbf.in).


(g) Safety the nut (61) with the new cotter-pin (62).
Subtask 27-21-52-420-053
D. Installation of the Rudder Control Rod (8)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) If, during the installation of the rudder control rod (8), you cannot
install the bolts (82) and (84) easily, do the steps that follow:
(a) Cut, remove and discard the lockwire from the nuts (73) and (77)
and from the rudder control rod (8).
(b) Loosen the nuts (73) and (77) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rod (8) until
you can install the bolts (82) and (84).
(d) TORQUE the nuts (73) and (77) to between 0.7 and 1.0 m.daN (61.94
and 88.49 lbf.in).
(e) Safety the nuts (73) and (77) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(2) Installation of the rudder control rod (8):
(a) Put the rudder control rod (8) in the installation position on
the rudder control rod (6) and the bellcrank (39).
(b) Install the bolt (84), the washer (72) and the nut (71).
(c) TORQUE the nut (71) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (71) with the new cotter-pin (70).
(e) Install the bolt (82), the washer (76) and the nut (75).
(f) TORQUE the nut (75) to 0.7 m.daN (61.94 lbf.in).
(g) Safety the nut (75) with the new cotter-pin (74).



EFF :
ALL
 27-21-52



AIJ




Page 423
Feb 01/07

(3) Connect the rudder control rod (9):


(a) Remove the adhesive tape from the control rod (9).
(b) Put the rudder control rod (9) in the installation position on
the rudder control rod (8).
(c) Install the bolt (81), the washer (80) and the nut (79).
(d) TORQUE the nut (79) to 0.7 m.daN (61.94 lbf.in).
(e) Safety the nut (79) with the new cotter-pin (78).
(4) Installation of the half-clamps (32):
(a) Put the half-clamps (32) and the spacer-tube (33) in position.
(b) Install the bolt (30), the washers (31) and the nut (34).
(c) TORQUE the nut (34) to 0.43 m.daN (38.05 lbf.in).
(d) Safety the nut (34) with the new cotter-pin (35).
Subtask 27-21-52-420-054
E. Installation of the Rudder Control Rod (9)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) If, during the installation of the rudder control rod (9), you cannot
install the bolts (95) and (100) easily, do the steps that follow:
(a) Cut, remove and discard the lockwire from the nuts (93) and (94)
and from the rudder control rod (9).
(b) Loosen the nuts (93) and (94) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rudder control
rod (9) until you can install the bolts (95) and (100).
(d) TORQUE the nuts (93) and (94) to between 0.7 and 1.0 m.daN (61.94
and 88.49 lbf.in).
(e) Safety the nuts (93) and (94) with the lockwire MISCELLANEOUS
(Material No. 19-010).



EFF :
ALL
 27-21-52



AIJ




Page 424
Feb 01/07

(2) Installation of the rudder control rod (9):


(a) Put the rudder control rod (9) in the installation position on
the rudder control rod (8) and the bellcrank (96).
(b) Install the bolt (100), the washer (92) and the nut (91).
(c) TORQUE the nut (91) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (91) with the new cotter-pin (90).
(e) Install the bolt (95), the washer (97) and the nut (98).
(f) TORQUE the nut (98) to 0.7 m.daN (61.94 lbf.in).
(g) Safety the nut (98) with the new cotter-pin (99).
Subtask 27-21-52-420-055
F. Installation of the Rudder Control Rod (10)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) If, during the installation of the rudder control rod (10), you
cannot install the bolts (116) and (121) easily, do the steps that
follow:
(a) Cut, remove and discard the lockwire from the nuts (114) and
(115) and from the rudder control rod (10).
(b) Loosen the nuts (114) and (115) from the rudder control rod ends.
(c) Hold the disconnected eye-ends and turn only the rudder control
rod (10) until you can install the bolts (116) and (121).
(d) TORQUE the nuts (114) and (115) to between 0.7 and 1.0 m.daN
(61.94 and 88.49 lbf.in).
(e) Safety the nuts (114) and (115) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(2) Installation of the rudder control rod (10):
(a) Put the rudder control rod (10) in the installation position on
the bellcranks (113) and (117).



EFF :
ALL
 27-21-52



AIJ




Page 425
Feb 01/07

(b) Install the bolt (121), the washer (112) and the nut (111).
(c) TORQUE the nut (111) to 0.7 m.daN (61.94 lbf.in).
(d) Safety the nut (111) with the new cotter-pin (110).
(e) Install the bolt (116), the washer (118) and the nut (119).
(f) TORQUE the nut (119) to 0.7 m.daN (61.94 lbf.in).
(g) Safety the nut (119) with the new cotter-pin (120).
Subtask 27-21-52-080-050
G. Preparation for the Test
R

(1) Remove the PIN-RIGGING (98D27207547000) (3) from the cable quadrant
(4).

(2) Remove the PIN-RIGGING (98D27207548000) (1) from the bellcrank of the
rudder control unit (2).

(3) Remove the PIN-RIGGING (98D27207545000) (11) from the bellcrank


assembly of the rudder travel limitation unit (12).
Subtask 27-21-52-865-052
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-21-52-710-050
J. Do an operational test of the rudder mechanical control (Ref. TASK 27-2400-710-001).
5. Close-up
________
Subtask 27-21-52-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the rudder fairing 325AL (Ref. TASK 53-55-12-400-001).



EFF :
ALL
 27-21-52



AIJ




Page 426
Nov 01/10

(3) Close the access panels 325BL, 325BR, 325CL, 325DL (Ref. TASK 55-3313-410-001).
(4) Close the access door 312AR.
Subtask 27-21-52-862-050
B. Put the aircraft back to its initial configuration.
(1) Remove the access platform(s).
(2) Remove the warning notice(s).
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).



EFF :
ALL
 27-21-52



AIJ




Page 427
Feb 01/07

CABLES - RUDDER CONTROL - REMOVAL/INSTALLATION


______________________________________________
TASK 27-21-61-000-001
Removal of the Rudder Control Cables
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
FE171901
98A27901002000
98D27207516000
98D27207547000

1
1
1
1
1
1

warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
TOOL - LOCKING
PIN,RIGGING-RUDDER CONTROL
PIN-RIGGING,SET
PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
R
R
R
R

25-54-12-000-001
25-54-12-000-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Forward Cargo-Compartment Partition
FR34
Removal of the Ceiling Panels in the Forward
Cargo-Compartment



EFF :
ALL
 27-21-61



AIJ




Page 401
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------25-55-11-000-002
25-55-12-000-001
25-55-12-000-002
29-10-00-863-003
29-10-00-864-003
53-12-11-000-001
53-12-12-000-001
53-22-12-000-001
53-32-12-000-002
27-21-61-991-001
27-21-61-991-002
27-21-61-991-003
27-21-61-991-006
27-21-61-991-004
27-21-61-991-005

Removal of the Ceiling Panels in the AFT Cargo


Compartment - FR47/FR59
Removal of the Aft Cargo-Compartment Partition FR65
Removal of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Removal of the Cabin Floor Panels from FR12 thru FR24
Removal of the Cabin Floor Panels
Removal of the Cabin Floor Panels
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-21-61-991-001, 402/TASK 27-21-61-991-002, 403/TASK
27-21-61-991-003, 404/TASK 27-21-61-991-006)
Subtask 27-21-61-010-050
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 132.
(2) Open the access door 825.
(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 154.
(4) Open the access door 826.
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at zone 312.
(6) Open the access door 312AR.



EFF :
ALL
 27-21-61


R 
AIJ




Page 402
Aug 01/11

R
R

Access - Location
Figure 401/TASK 27-21-61-991-001



EFF :
ALL
 27-21-61



AIJ




Page 403
Feb 01/07

R
R

Cable Mechanism
Figure 402/TASK 27-21-61-991-002



EFF :
ALL
 27-21-61



AIJ




Page 404
Feb 01/07

R
R

Tension Regulator
Figure 403/TASK 27-21-61-991-003



EFF :
ALL
 27-21-61



AIJ




Page 405
Feb 01/07

R
R

Cable Quadrant
Figure 404/TASK 27-21-61-991-006



EFF :
ALL
 27-21-61



AIJ




Page 406
Feb 01/07

(7) In the zones 211 and 221, remove the floor panels 211GF, 211KF,
221EF, 231CF 221LF (Ref. TASK 53-12-11-000-001), (Ref. TASK 53-12-12000-001).
(8) In the zone 241, remove the floor panels 231WF, 241BF, 241FF, 241KF
(Ref. TASK 53-22-12-000-001), (Ref. TASK 53-32-12-000-002).
(9) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-000-002).
(10) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-5412-000-001).
(11) In the zones 151 and 161, remove the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK
25-55-12-000-002).
(12) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK
25-55-12-000-001).
Subtask 27-21-61-860-050
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the panel 23VU, make sure that the FLT CTL/FAC1 pushbutton switch
is pushed (on this pushbutton switch, the OFF and FAULT legends are
off).
(3) On the panel 24VU, make sure that the FLT CTL/FAC2 pushbutton switch
is pushed (on this pushbutton switch, the OFF and FAULT legends are
off).
(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(6) On the panel 23VU, release the FLT CTL/FAC1 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
(7) On the panel 24VU, release the FLT CTL/FAC2 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).



EFF :
ALL
 27-21-61


R 
AIJ




Page 407
Aug 01/11

R
R

(8) Install the PIN-RIGGING (98D27207547000) (48) or PIN-RIGGING,SET


(98D27207516000) pin (98D27207516160) on the cable quadrant (45).
(Refer to Detail Q).
(9) Put the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) on the input
lever of the tension regulator (1).
(Refer to Details G and A).
(10) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(11) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
(12) Put warning notices on the CAPT and F/O rudder pedals.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-61-991-001, 402/TASK 27-21-61-991-002, 403/TASK
27-21-61-991-003, 404/TASK 27-21-61-991-006, 405/TASK 27-21-61-991-004,
406/TASK 27-21-61-991-005)
Subtask 27-21-61-020-053
A. Removal of the Rudder Control Cables (Forward Part)
(1) Removal of the turnbuckles.
(a) Remove the locking clips (33) from the turnbuckles (34) (Refer to
Detail L).
(b) Turn the turnbuckles (34) until you can install the TOOL LOCKING (FE171901) (18) on the tension regulator (1).
(c) Install the TOOL - LOCKING (FE171901) (18) on the tension
regulator (1) with the pins (17).
(d) Remove and discard the cotter-pins (6) from the cable-end holders
of the tension regulator (1) (Refer to Details C and D).
(e) Remove the turnbuckles (34).
(2) Removal of the cable guides on frames 35, 33, 28, 23 and 14 (refer to
detail K).
(a) Cut and discard the cable ties (32).
(b) Remove the locking devices (31).



EFF :
ALL
 27-21-61



AIJ




Page 408
Aug 01/11

R
R

Frame Feed-Through Fittings


Figure 405/TASK 27-21-61-991-004



EFF :
ALL
 27-21-61



AIJ




Page 409
Feb 01/07

R
R

Pulley
Figure 406/TASK 27-21-61-991-005



EFF :
ALL
 27-21-61



AIJ




Page 410
Feb 01/07

(c) Remove the half shells (30).


(3) Removal of the cables from the tension regulator.
(a) Remove and discard the cotter-pin (11), remove the nut (10) and
the washer (9) (Refer to Detail E).
(b) Remove the bolt (7) and the spacer (8) from the pulley casing
(3).
(c) Remove and discard the cotter-pins (16), remove the nuts (15) and
the washers (14) (Refer to Detail F).
(d) Remove the bolts (12) and the spacers (13).
CAUTION : MONITOR THE END OF THE CABLE WHEN YOU PULL IT.
_______
(e) Remove the cables (4) and (5) from the tension regulator (1) and
pull them. (Refer to Details C and D).
Subtask 27-21-61-020-054
B. Removal of the Rudder Control Cables (Rear Part)
(1) Removal of the cable guides on frames 42, 48, 53, 58, 63 and 67 and
on the pulley (42) (Refer to Details K and N).
(a) Cut and discard the cable ties (32).
(b) Remove the locking devices (31).
(c) Remove the half shells (30).
(2) Removal of the cable guides on frame 70 (Refer to Detail H, section
JJ).
(a) Remove the clamp (26) and release the sleeve (27) from the cable
guide.
(b) Cut and remove the lockwire from the bolts (28).
(c) Remove the bolts (28) and the washers (29). Release the flange
(24) and remove the half shells (25).



EFF :
ALL
 27-21-61


R 
AIJ




Page 411
Aug 01/11

(3) Removal of the pulley cover (Refer to Detail M).


(a) Remove the bolts (35), the washers (36) and the plate (37).
(b) Remove the bolts (38) and the washers (39).
(c) Remove the cover (42).
(4) Removal of the cables from the cable quadrant.
(a) Remove the two pins (40).
(b) Remove the four pins (49) from the pulleys (50) and (51) (Refer
to Detail R).
CAUTION : MONITOR THE END OF THE CABLE WHEN YOU PULL IT.
_______
(c) Release the cables (21) and (22) from the cable quadrant (45).
Pull them until they touch the frame 70.
(d) On the frame 70, remove the sleeve (27) and the flanges (23) and
(24) (Refer to Section JJ).
(e) In zone 310, pull and remove the cables (21) and (22).



EFF :
ALL
 27-21-61


R 
AIJ




Page 412
Aug 01/11

TASK 27-21-61-400-001
Installation of the Rudder Control Cables
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
FE171901
98A27901002000
98D27207516000
98D27207547000
98F27003500000

1
1
1
1
1
1
1

tensiometer
warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
TOOL - LOCKING
PIN,RIGGING-RUDDER CONTROL
PIN-RIGGING,SET
PIN-RIGGING
LOCKING,TOOL-CABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-21-61



AIJ




Page 413
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

6
11
32
32

cotter-pins
cotter-pin
cable ties
cable ties

27-21-01
27-21-01
27-21-04
27-21-04

12B-010
13A-045
04A-070
05A-070

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-862-002
R
R
R
R

25-54-12-400-001
25-54-12-400-002
25-55-11-400-002
25-55-12-400-001
25-55-12-400-002
27-21-00-820-002
27-21-00-820-005
29-10-00-863-003
29-10-00-864-003
53-12-11-400-001
53-12-12-400-001
53-22-12-400-001
53-32-12-400-002
27-21-61-991-001
27-21-61-991-002
27-21-61-991-003
27-21-61-991-006
27-21-61-991-004
27-21-61-991-005

De-energize the Aircraft Electrical Circuits Supplied


from the External Power
Installation of the Forward Cargo-Compartment
Partition FR34
Installation of the Ceiling Panels in the Forward
Cargo-Compartment
Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
Installation of the Aft Cargo-Compartment Partition
FR65
Installation of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Adjustment of the Rudder Control-Cables Length
Cutting of the Rear Control Cable of the Rudder
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Installation of the Cockpit Floor Panels from FR1
thru FR12
Installation of the Cabin Floor Panels from FR12 thru
FR24
Installation of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406



EFF :
ALL
 27-21-61



AIJ




Page 414
Aug 01/11

3. __________
Job Set-up
Subtask 27-21-61-010-055
A. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in
position at zone 132.
(2) Make sure that the access door 825 is open.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in
position at zone 154.
(4) Make sure that the access door 826 is open.
(5) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at zone 312.
(6) Make sure that the access door 312AR is open.
(7) In the zones 211 and 221, make sure that the floor panels 211GF,
211KF, 221EF, 231CF 221LF are removed.
(8) In the zone 241, make sure that the floor panels 231WF, 241BF, 241FF,
241KF are removed.
(9) In the zone 131, make sure that the ceiling panels 131AC, 131BC,
131CC are removed.
(10) In the zone 131, make sure that the partition panel 131PW is removed.
(11) In the zones 151 and 161, make sure that the ceiling panels 151AC,
151BC, 151CC, 151DC, 161AC, 161BC are removed.
(12) In the zone 161, make sure that the partition panels 161DW, 162DW are
removed.
Subtask 27-21-61-860-052
B. Aircraft Maintenance Configuration
R
R

(1) Make sure that the PIN-RIGGING (98D27207547000) (48) or PINRIGGING,SET (98D27207516000) pin (98D27207516160) is installed on the
cable quadrant (45). (Refer to Detail Q).
(2) Make sure that the PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) is
installed on the input lever of the tension regulator (1).
(Refer to Details G and A).
(3) Make sure that the TOOL - LOCKING (FE171901) (18) with th pins (17)
is installed on the tension regulator (1).



EFF :
ALL
 27-21-61



AIJ




Page 415
Aug 01/11

(4) Make sure that the Blue hydraulic system (Ref. TASK 29-10-00-864-003)
is depressurized.
(5) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002)
(6) On the CAPT and F/O rudder pedals, make sure that the warning notices
are in position.
Subtask 27-21-61-640-050
C. Apply COMMON GREASE (Material No. 04-004) to all the nuts and bolts.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-21-61-991-001, 402/TASK 27-21-61-991-002, 403/TASK
27-21-61-991-003, 404/TASK 27-21-61-991-006, 405/TASK 27-21-61-991-004,
406/TASK 27-21-61-991-005)
Subtask 27-21-61-420-050
A. Installation of the Rudder Control Cables (Forward Part)
(1) Install the cables through the frames and on the tension regulator.
(a) Put the cables (4) and (5) through the frames 35, 33, 28, 23 and
14 as follows:
- put the cable (4), with the cylindrical fool-proof device (Ref.
Detail D), on the right (inboard side)
- put the cable (5), with the spherical fool-proof device (Ref.
Detail C), on the left (outboard side).
NOTE : The fool-proof device is to avoid error when you install
____
the cables.
(b) Put the cable (4) through the pulley (20) (Refer to Detail B).
(c) Put the cable (5) through the pulley (19).
(d) Install the cables (4) and (5) on the tension regulator (1)
(Refer to Details G, D, C).
(e) Install the new cotter-pins (6) on the cable-end holders of the
tension regulator (1) (Refer to Details C and D).



EFF :
ALL
 27-21-61


R 
AIJ




Page 416
Feb 01/11

(f) Install the spacers (13), the bolts (12), the washers (14) and
the nuts (15). Install the new cotter-pins (16) (Refer to Detail
F).
(g) Install the spacer (8), the bolt (7), the washer (9) and the nut
(10). Install the new cotter-pin (11) (Refer to Detail E).
(2) Install the cable guides on the frames 14, 23, 28, 33 and 35 (Refer
to Detail K).
(a) Install the half shells (30).
(b) Install the locking devices (31).
(c) Install new cable ties (32).
Subtask 27-21-61-420-051
B. Installation of the Cables (Rear Part)
(1) Install the cables on the cable quadrant and through the frames.
(a) Install the cables (21) and (22) on the cable quadrant (45)
(Refer to Detail Q).
NOTE : The cable (22) is longer than the cable (21). Install it
____
on the top part of the cable quadrant (45) and put it on
the left side.
(b) Put the cable (21) on the pulley (50) (Refer to Detail P).
(c) Put the cable (22) on the pulley (51).
(d) Put the cable (21) on the pulley (43) (Refer to Detail M).
(e) Put the cable (22) on the pulley (41).
(f) Put the cables (21) and (22) through the frame 70 (Refer to
Detail H).
(g) Install the flanges (23), (24) and the sleeve (27) on the cables
(21) and (22).



EFF :
ALL
 27-21-61


R 
AIJ




Page 417
Feb 01/07

(h) Put the cables (21) and (22) through the frames 67, 63, 58, 53,
48 and 42.
NOTE : If you install a new rear control cable, do the procedure
____
of cutting of the rear control cable of the rudder
(Ref. TASK 27-21-00-820-005).
(2) Install the turnbuckles and the cable guides.
R

(a) Install the LOCKING,TOOL-CABLE (98F27003500000) to connect the


cable (21) and the cable (4) with the turnbuckle (34). Lightly
tighten the turnbuckle (34) (Refer to Detail L).

(b) Remove the LOCKING,TOOL-CABLE (98F27003500000).

(c) Install the LOCKING,TOOL-CABLE (98F27003500000) to connect the


cable (22) and the cable (5) with the turnbuckle (34). Lightly
tighten the turnbuckle (34) (Refer to Detail L).

(d) Remove the LOCKING,TOOL-CABLE (98F27003500000).


(e) Install the cable guides on the frames 42, 48, 53, 58, 63 and 67
(Refer to Detail K).
For this, do these steps:
1
_

Install the half shells (30).

2
_

Install the locking devices (31).

3
_

Install new cable ties (32).

(f) Install the half shells (25) on the cables (21) and (22) between
the edges of the flanges (23) and (24) (Refer to Section JJ).
(g) Install the flanges (23) and (24) on the frame 70 with the
washers (29) and the bolts (28). Do not tighten the bolts at this
time.
(h) Install the sleeve (27) and the clamp (26).
(3) Install the pulley cover and its cable guides.
(a) Install the two pins (49) on the pulley (50) (Refer to Detail R).
(b) Install the two pins (49) on the pulley (51) (Refer to Detail R).



EFF :
ALL
 27-21-61



AIJ




Page 418
May 01/10

(c) Install the two pins (40) on the support of the pulleys (41) and
(43) (Refer to Detail M).
(d) Install the cover (42).
(e) Install the washers (39) and the bolts (38).
(f) Install the plate (37), the washers (36) and the bolts (35). Do
not tighten the bolts at this time.
(g) Install the cable guides on the plate (37) (Refer to Detail N).
For this, do these steps:
1
_

Install the half shells (30).

2
_

Install the locking devices (31).

3
_

Install new cable ties (32).

Subtask 27-21-61-820-051
C. Preparation for the Adjustment
(Ref. Fig. 402/TASK 27-21-61-991-002, 403/TASK 27-21-61-991-003, 404/TASK
27-21-61-991-006, 405/TASK 27-21-61-991-004, 406/TASK 27-21-61-991-005)

R
R

(1) If you install a new cable, you must apply a pre-tension to the cable
before you adjust it.
- In theory, the pre-tension time is 48 hours without movement of the
aircraft. After this pre-tension time the adjustment of the cable
will stay correct.
- A minimum pre-tension time of 4 hours without movement of the
aircraft is permitted. The adjustment of the cable will not stay
correct for a long time. You must do the full pre-tension procedure
when the aicraft stops for maintenance for a sufficiently long
time.
- For a pre-tension time of between 4 and 48 hours, the stability of
the adjustment is in proportion to the pre-tension time.
(a) Turn the turnbuckles (33) to put a tension of 45 +5 +0 daN
(101.1640 +11.2404 +0.0000 lbf) on the cable mechanism. Measure
this value with a tensiometer.
(b) Make sure that you can easily remove and install the pin (2) on
the tension regulator (1). If not, adjust the tension again.
(Refer to Detail A).



EFF :
ALL
 27-21-61



AIJ




Page 419
Feb 01/07

(c) Install the pin (2) on the input lever of the tension regulator
(1).
(d) You must keep the mechanism in this configuration for 48 hours.
Subtask 27-21-61-820-052
D. Adjustment
(Ref. Fig. 402/TASK 27-21-61-991-002, 403/TASK 27-21-61-991-003, 404/TASK
27-21-61-991-006, 405/TASK 27-21-61-991-004)

R
R

(1) Pressurize the Blue hydraulic system


(Ref. TASK 29-10-00-863-003).
(2) Turn the turnbuckles (34) to release the tension on the mechanism. Do
this until you can remove the locking tool (18) from the tension
regulator (1) (Refer to Details L and G).
(3) Remove the TOOL - LOCKING (FE171901) (18) with the pins (17).
(4) Make sure that the flanges (23) and (24) are in the correct position
related to the cables (21) and (22). Tighten the bolts (28) (Refer to
Section JJ).
NOTE : Make sure that you can turn the half shells (25) easily.
____
(5) Safety the bolts (28) with Lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).
(6) Turn the turnbuckles until you cannot see the threads of the aft and
rear wire rope terminal control cables of the rudder.
(7) Safety the turnbuckles with the locking clips.
(8) Make sure that the cables (21) and (22) are aligned correctly on the
output of the pulley (42). Tighten the bolts (35) (Refer to Detail
M).
(9) Adjust the control cables length (Ref. TASK 27-21-00-820-002).
NOTE : During the test make sure that:
____
- the deflections of all control components are free,
- there is no interference or friction with adjacent ducts,
structures, electrical routing or controls.



EFF :
ALL
 27-21-61



AIJ




Page 420
Feb 01/07

NOTE : If you can not adjust the control cables, do a visual


____
inspection on the pulleys and the tension regulator. If they
are in good condition, replace the control cables.
(10) Make sure that the distance between the turnbuckles and the fairleads
is minimum 25.4 mm (1.0000 in.) over the full travel range of the
rudder control.
(11) Make sure that the distance between the ends of the turnbuckles in
each rudder control cable is minimum 90 mm (3.5433 in.) in all the
positions.
5. Close-up
________
(Ref. Fig. 401/TASK 27-21-61-991-001, 402/TASK 27-21-61-991-002, 403/TASK
27-21-61-991-003, 404/TASK 27-21-61-991-006)
Subtask 27-21-61-860-051
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
R
R

(2) Remove the PIN-RIGGING (98D27207547000) (48) or PIN-RIGGING,SET


(98D27207516000) pin (98D27207516160) from the cable quadrant (45)
(Refer to Detail Q).
(3) Remove the pin PIN,RIGGING-RUDDER CONTROL (98A27901002000) (2) from
the tension regulator (1) (Refer to Detail A).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the warning notice(s).
Subtask 27-21-61-410-054
B. Close Access
(1) In the zones 211 and 221, install the floor panels 211GF, 211KF,
221EF, 231CF 221LF (Ref. TASK 53-12-11-400-001) (Ref. TASK 53-12-12400-001).
(2) In the zone 241, install the floor panels 231WF, 241BF, 241FF, 241KF
(Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400-002).



EFF :
ALL
 27-21-61



AIJ




Page 421
Aug 01/11

(3) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-400-002).
(4) In the zone 131, install the partition panel 131PW (Ref. TASK 25-5412-400-001).
(5) In the zones 151 and 161, install the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-400-002) (Ref. TASK
25-55-12-400-002).
(6) In the zone 161, install the partition panels 161DW, 162DW (Ref. TASK
25-55-12-400-001).
(7) Close the access doors 312AR, 825, 826.
(8) Remove the access platform(s).



EFF :
ALL
 27-21-61



AIJ




Page 422
Feb 01/07

RUDDER TRIM ACTUATION - DESCRIPTION AND OPERATION


_________________________________________________
1. _______
General
(Ref. Fig. 001)
The rudder trim control is electrically signalled. An electric actuator
installed in the tail area drives a trim screwjack via a rotary shaft and
universal joints.
The actuator is manually controlled via the FACs (Ref. ATA 22) from the
control panel located on the center pedestal, at a constant speed.
A reset function initiated when you press a RESET pushbutton switch on the
control panel permits to null the rudder trim position through the FACs.
The rudder trim position is shown on the control panel.
The FACs also control the trim actuator in AP mode.
NOTE : The maximum admissible rudder trim limits indicated on the control
____
panel when the aircraft is stabilized in heading with the AP engaged
are RH 1 DEG and LH 2.3 DEG.
2. Component
__________________
Location
(Ref. Fig. 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------10CC
ACTUATOR-RUDDER TRIM
325 325AL
27-22-51
9CC
CTL SW-RUDDER TRIM
110VU 211 831
22-62-11



EFF :
ALL
 27-22-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-22-00



AIJ




Page 2
Feb 01/07

Trim (Rudder)
Figure 001

EFF :
ALL
 27-22-00




AIJ




Page 3/4
Feb 01/07

Location of Rudder Trim Actuation


Figure 002


EFF :
ALL
 27-22-00



AIJ




Page 5
Feb 01/07

3. _____________________
Component Description
A. Rudder Trim Actuator
(Ref. Fig. 001)
(1) The actuator has two 3-phase asynchronous motors installed on the
same shaft (but they are electrically independent and controlled by
independent plug-in electronic assemblies).
The motors are permanently coupled to a reduction gear which drives
the output shafts via a torque limiter.
(2) Non-locking rotary stops limit the actuator stroke.
(3) The main output shaft is internally duplicated by a second shaft
which permits a duplicate recopy (this duplication prevents the loss
of the four transducers if there is a single rupture).
(4) The output shaft drives four inductive transducer units :
- the main output shaft drives the feedback transducer unit of one
channel and the monitoring transducer unit of the other channel
through a reduction gear
- the internal output shaft drives the other two transducer units in
the same manner.
(5) An externally-visible index on the last actuating gear of one of the
transducer units shows the zero position of the output shaft.
(6) A tapered rigging pin is used to set the output shaft at mid angular
travel (zero trim position and zero reference for setting of
transducers).
There is no damage if a motor is energized with the pin in position.
(7) The actuator is sealed and has a desiccant patch, the color of which
is externally visible.
(8) Electronic assembly :
- a monitoring output makes the test of the electronic circuitry
possible
- a monitoring power supply permits the automatic test of the
electronic assembly at each FAC.
B. Maintenance
The component below is a line-replaceable unit (LRU) :
- electronic assembly



EFF :
ALL
 27-22-00



AIJ




Page 6
Feb 01/07

4. ______________________
Control and Indicating
A. Control Panel
The RUD TRIM control panel includes :
- a RUD TRIM control switch
- a RESET pushbutton switch
- a RUD TRIM indicator
(1) RUD TRIM control switch
This is a 3-position rotary switch spring-loaded to the neutral
(center) position.
The direction of rudder trim travel depends on the direction of the
switch rotation.
(2) RESET pushbutton switch
This pushbutton switch permits to automatically reset the rudder trim
to zero.
After a RESET selection through push action on the pushbutton switch,
this switch returns to its initial position.
(3) RUD TRIM indicator
A digital indicator (1/10 resolution) shows the rudder trim travel
together with the direction (L or R).



EFF :
ALL
 27-22-00



AIJ




Page 7
Feb 01/07

RUDDER TRIM ACTUATION - DEACTIVATION/REACTIVATION


_________________________________________________
TASK 27-22-00-040-001
Deactivation of the Channel 1 of the Rudder Trim Actuator
1. __________________
Reason for the Job
R
R
R

Refer to the MMEL TASK: 22-60-01-A)


FAC 1
(Old MMEL ref: 22-66-01-A))
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-22-00-710-002

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Operational Test of the Rudder Trim Actuation

3. __________
Job Set-up
Subtask 27-22-00-860-059
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).



EFF :
ALL
 27-22-00



AIJ




Page 401
May 01/11

Subtask 27-22-00-010-052
B. Get access to the Avionics Compartment
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the
access door 824.
(2) Open the access door 824.
Subtask 27-22-00-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
4. Procedure
_________
Subtask 27-22-00-040-050
A. Deactivation of the Channel 1 of the Rudder Trim Actuator
(1) On the panel 187VU, remove the relay 7CC1.
(2) Remove the safety clip(s) and the tag(s) and close this(these)
circuit breaker(s):
5CC1.
Subtask 27-22-00-710-053
B. Do the operational test of the rudder trim actuation (Ref. TASK 27-22-00710-002) .
5. Close-up
________
Subtask 27-22-00-941-053
A. Safety Precautions
(1) Put a warning notice in the cockpit to tell the crew that the channel
1 of the rudder trim actuator is deactivated.
(2) Make an entry in the logbook.



EFF :
ALL
 27-22-00



AIJ




Page 402
Feb 01/11

Subtask 27-22-00-410-053
B. Close Access
(1) Close the access door 824.
(2) Remove the access platform(s).
Subtask 27-22-00-862-054
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)



EFF :
ALL
 27-22-00


R 
AIJ




Page 403
Feb 01/07

TASK 27-22-00-440-001
Reactivation of the Channel 1 of the Rudder Trim Actuator
1. __________________
Reason for the Job
R
R
R

Refer to the MMEL TASK: 22-60-01-A)


FAC 1
(Old MMEL ref: 22-66-01-A))
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
TSM

22

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
(for corrective action)

3. __________
Job Set-up
Subtask 27-22-00-860-060
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 27-22-00-010-053
B. Get access to the Avionics Compartment
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the
access door 824.
(2) Open the access door 824.



EFF :
ALL
 27-22-00



AIJ




Page 404
May 01/11

Subtask 27-22-00-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
4. Procedure
_________
Subtask 27-22-00-440-050
A. Reactivation of the Channel 1 of the Rudder Trim Actuator
(1) On the panel 187VU, install the relay 7CC1
(2) Remove the safety clip(s) and the tag(s) and close this(these)
circuit breaker(s):
5CC1.
Subtask 27-22-00-810-050
B. Do the trouble shooting of the rudder trim actuator you deactivated (Ref.
TSM 22).
5. Close-up
________
Subtask 27-22-00-410-054
A. Close Access
(1) Close the access door 824.
(2) Remove the access platform(s).
Subtask 27-22-00-862-055
B. Put the aircraft back to its initial configuration.
(1) Remove the warning notice(s).
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).



EFF :
ALL
 27-22-00


R 
AIJ




Page 405
Feb 01/07

RUDDER TRIM ACTUATION - ADJUSTMENT/TEST


_______________________________________
TASK 27-22-00-820-001
Adjustment of the Rudder Trim Actuation
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS CAN
_______
CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN POSITION ON
THE RUDDER CONTROL.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
6137-060
98D27207516000
98D27207548000
98D27207549000

1
1
1
1
1

warning notice
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
PIN - LOCKING
PIN-RIGGING,SET
PIN-RIGGING
PIN-RIGGING

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------8

cotter pin

27-23-04 02 -080



EFF :
ALL
 27-22-00



AIJ




Page 501
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-22-00-710-002
27-22-51-000-001
27-22-51-400-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
27-22-00-991-001
27-22-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Rudder Trim Actuation
Removal of the Rudder Trim Actuator (10CC)
Installation of the Rudder Trim Actuator (10CC)
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 501
Fig. 502

3. __________
Job Set-up
Subtask 27-22-00-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
zone 325.
(2) Open the access doors 325BL, 325BR.
Subtask 27-22-00-861-053
B. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).



EFF :
ALL
 27-22-00



AIJ




Page 502
Feb 01/11

Subtask 27-22-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-22-00-860-058
D. Aircraft Maintenance Configuration
(1) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(2) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(3) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(4) Put a warning notice in position on the CAPT and F/O pedals to tell
persons not to use the rudder mechanical control.
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
R
R

(6) Install the PIN-RIGGING (98D27207549000) (5) or PIN-RIGGING,SET


(98D27207516000) pin (98D27207516330) on the output bellcrank (6) of
the yaw damper.
(Ref. Fig. 501/TASK 27-22-00-991-001)
(7) Make sure that the trim actuator (2) is set to zero (look through the
window and make sure that the mark on the rear face is in the correct
position).
(Ref. Fig. 501/TASK 27-22-00-991-001)



EFF :
ALL
 27-22-00



AIJ




Page 503
Aug 01/11

R
R

Position of the Rigging Pins


Figure 501/TASK 27-22-00-991-001



EFF :
ALL
 27-22-00



AIJ




Page 504
Feb 01/07

(8) Remove the blanking plug (12) from the trim actuator (2) and install
it in the storage hole.
(Ref. Fig. 502/TASK 27-22-00-991-002)
(9) Install the PIN - LOCKING (6137-060) (7) on the trim actuator (2).
(Ref. Fig. 502/TASK 27-22-00-991-002)
(10) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).
4. Procedure
_________
(Ref. Fig. 501/TASK 27-22-00-991-001, 502/TASK 27-22-00-991-002)
Subtask 27-22-00-820-051
A. Adjustment of the Rudder Trim Activation
R

(1) Install the PIN-RIGGING (98D27207548000) (4) or PIN-RIGGING,SET pin


(98D27207516330) on the mixer (3) of the artificial feel unit. You
must be able to install and remove the rigging pin easily.
(2) For all the rigging results, disconnect the artificial feel spring
rod (1) at the top to make sure that it is in the zero position. To
do this:
(a) Remove the cotter pin (8) and discard it.
(b) Remove the nut (9) and the washer (10).
(c) Remove the bolt (11).
(3) Connect the artificial feel spring rod (1) to the mixer (3). To do
this:
(a) Install the bolt (11).
If you cannot install the bolt (11) easily or if you cannot
install the rigging pin (4) during the operation before, do these
steps:
1
_

Remove the trim actuator (2) (Ref. TASK 27-22-51-000-001).

2
_

Turn the gimbal joint of the artificial-feel spring rod (1)


until you can install and remove the rigging pin (4) and the
bolt (11) easily.



EFF :
ALL
 27-22-00



AIJ




Page 505
Aug 01/11

Rudder Trim Actuator


Figure 502/TASK 27-22-00-991-002


EFF :
ALL
 27-22-00


R 
AIJ




Page 506
Aug 01/11

3
_

Install the trim actuator (2) (Ref. TASK 27-22-51-400-001).

(b) Install the washer (10), the nut (9) and the new cotter pin (8).
R

(4) Remove the rigging pins (4), (5) and (7).


(Ref. Fig. 501/TASK 27-22-00-991-001, 502/TASK 27-22-00-991-002)

(5) Install the blanking plug (12) on the rigging hole of the trim
actuator (2).
(Ref. Fig. 502/TASK 27-22-00-991-002)
Subtask 27-22-00-720-051
B. Do the operational test of the rudder trim (Ref. TASK 27-22-00-710-002).
5. Close-up
________
Subtask 27-22-00-860-057
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).
(2) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-22-00-410-050
B. Close Access
(1) Close the access doors 325BL, 325BR.
(2) Remove the access platform(s).



EFF :
ALL
 27-22-00



AIJ




Page 507
Feb 01/07

TASK 27-22-00-710-001
Operational Test of the Reset Function
R
R
R
R
R
R

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-01
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-22-00



AIJ




Page 508
May 01/11

3. __________
Job Set-up
Subtask 27-22-00-860-053
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the overhead panel 23VU, make sure that the FLT CTL/FAC 1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(3) On the overhead panel 24VU, make sure that the FLT CTL/FAC 2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(4) On the panel 110VU, make sure that the rudder trim is in the zero
position.
(5) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-22-00-865-051
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-22-00


R 
AIJ




Page 509
May 01/11

4. Procedure
_________
Subtask 27-22-00-710-050
A. Operational Test of the Reset Function
R
R
R

NOTE : This test is for the system 1. For the system 2, use the
____
indications between the parentheses.
You must do this test for the system 1 and the system 2.
------------------------------------------------------------------------------|
ACTION
|
RESULT
|
-------------------------------------------------------------------------------

1. On the FLT CTL panel 24VU (23VU):

R
R
R
R

- release the FAC2 (FAC1)


pushbutton switch.

On the FAC2 (FAC1) pushbutton switch:


- the OFF legend comes on and the FAULT
legend stays off.

2. On the center pedestal, on the


panel 110VU:
- turn the RUD TRIM selector
switch to the NOSE/L position
and hold it in this position.

The rudder moves to the left.


On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value L
20 deg plus or minus 1 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the left.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.

3. Release the RUD TRIM selector


switch.

There is no change.

4. Push and release the RUD


TRIM/RESET pushbutton switch.

The rudder moves to the zero position.

R
R

On the panel 110VU, on the RUD TRIM


indicator:



EFF :
ALL
 27-22-00



AIJ




Page 510
May 01/11

R
R
R
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- the numbers change until the value L
0 deg plus or minus 0.3 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the center mark.

5. Turn the RUD TRIM selector switch The rudder moves to the right.
in the NOSE/R position and hold it
in this position.
On the panel 110VU, on the RUD TRIM
indicator:
- the numbers change until the value R
20 deg plus or minus 1 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the right.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.

6. Push the RUD TRIM/RESET pushbutton The rudder moves to the zero position
switch and hold the RUD TRIM
and stays in this position.
selector switch in the NOSE/R
position.
On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value R
0 deg plus or minus 0.3 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the center mark.

7. Release the RUD TRIM selector


switch and the RUD TRIM/RESET
pushbutton switch.

8. On the FLT CTL panel 24VU (23VU):

There is no change.



EFF :
ALL
 27-22-00



AIJ




Page 511
May 01/11

R
R
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- Push the FAC2 (FAC1) pushbutton On this pushbutton switch:
switch.
- the OFF legend goes off and the FAULT
legend stays off.
5. Close-up
________
Subtask 27-22-00-860-054
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-22-00



AIJ




Page 512
May 01/11

TASK 27-22-00-710-002
Operational Test of the Rudder Trim Actuation
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-22-00-860-051
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).



EFF :
ALL
 27-22-00


R 
AIJ




Page 513
May 01/11

(3) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(4) On the panel 110VU, make sure that the RUD TRIM indicator shows 0.
(5) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-22-00-865-054
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-22-00-710-051
A. Operational Test of the Rudder Trim Actuation
------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal, on the
panel 110VU:
- turn the RUD TRIM selector
switch in the NOSE/R position
and hold it in this position.

The rudder moves to the right.


On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value R
20 deg plus or minus 1 comes into
view.



EFF :
ALL
 27-22-00


R 
AIJ




Page 514
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the center instrument panel, on the
lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the right.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.
2. Release the RUD TRIM selector
switch.

There is no change.

3. Push and release the RUD


TRIM/RESET pushbutton switch.

The rudder moves to the zero position.


On the panel 110VU, on the RUD TRIM
indicator:
- the numbers change until the value R
0 deg plus or minus 0.3 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the center mark.

4. Turn the RUD TRIM selector switch The rudder moves to the left.
in the NOSE/L position and hold it
in this position.
On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value L
20 deg plus or minus 1 comes into
view.
On the center instrument panel, on the
lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the left.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.
5. Release the RUD TRIM selector
switch.

There is no change.



EFF :
ALL
 27-22-00


R 
AIJ




Page 515
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------6. Push and release the RUD
The rudder moves to the zero position.
TRIM/RESET pushbutton switch.
On the panel 110VU, on the RUD TRIM
indicator:
- the numbers change until the value L
0 deg plus or minus 0.3 comes into
view.
On the lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the center mark.
5. Close-up
________
Subtask 27-22-00-860-052
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-22-00


R 
AIJ




Page 516
May 01/11

TASK 27-22-00-730-001
System Test of the Rudder Trim
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
TR31-101
TR60-1
98A27308005000

1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


PROTRACTOR - CONTROL SURFACE
RIGMASTER SYSTEM-FLIGHT CONTROLS
PROTRACTOR-CONTROL SURFACE DEFLECTION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-22-00


R 
AIJ




Page 517
May 01/11

3. __________
Job Set-up
Subtask 27-22-00-860-056
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(3) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(4) On the panel 110VU, make sure that the RUD TRIM indicator shows 0.
(5) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(7) On the ECAM control panel, push the F/CTL key (on the lower ECAM
display unit, the F/CTL page comes into view).
(8) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
zone 325.
(9) Install the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000),
or RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101) on the rudder surface.
Subtask 27-22-00-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-22-00


R 
AIJ




Page 518
May 01/11

4. Procedure
_________
Subtask 27-22-00-730-050
A. System Test of the Rudder Trim
------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal, on the
panel 110VU:
- turn the RUD TRIM selector
switch in the NOSE/R position
and hold it in this position.

The rudder moves to the right.


The protractor shows a value higher
than 20 deg.
On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value R
20 deg. plus or minus 1 comes into
view.
On the center instrument panel, on the
lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the right.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.

2. Release the RUD TRIM selector


switch.

There is no change.

3. Turn the RUD TRIM selector switch The rudder moves to the left.
in the NOSE/L position and hold it
in this position.
The protractor shows a value higher
than 20 deg.
On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value L
20 deg. plus or minus 1 comes into
view.



EFF :
ALL
 27-22-00


R 
AIJ




Page 519
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the center instrument panel, on the
lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the left.
NOTE : In some cases, the pointer of
____
the RUD indicator is not in line
with the trim index.
4. Turn the RUD TRIM selector switch The rudder moves to the zero position.
to the NOSE/R position until the
rudder moves to the zero position. The protractor shows the value 0 plus
or minus 0.3 deg.
On the panel 110VU, on the RUD TRIM
position indicator:
- the numbers change until the value L
or R 0 deg. plus or minus 0.3 comes
into view.
On the center instrument panel, on the
lower ECAM display unit:
- the pointer of the RUD indicator and
the index that show the trim value
move to the center mark.
5. Close-up
________
Subtask 27-22-00-860-055
A. Put the aircraft back to its initial configuration.
(1) Remove the PROTRACTOR-CONTROL SURFACE DEFLECTION (98A27308005000), or
RIGMASTER SYSTEM-FLIGHT CONTROLS (TR60-1), or PROTRACTOR - CONTROL
SURFACE (TR31-101).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Remove the access platform(s).
(4) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).



EFF :
ALL
 27-22-00


R 
AIJ




Page 520
May 01/11

(5) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).


(6) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-22-00



AIJ




Page 521
May 01/11

ACTUATOR - RUDDER TRIM (10CC) - REMOVAL/INSTALLATION


____________________________________________________
TASK 27-22-51-000-001
Removal of the Rudder Trim Actuator (10CC)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
6137-013
6137-060
98D27207548000

1
1
1
1
1

blanking caps
circuit breaker(s) safety clip(s)
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
WARNING NOTICE(S)
PIN-LOCKING
PIN - LOCKING
PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-22-51



AIJ




Page 401
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
55-33-13-000-001
55-33-13-010-002
27-22-51-991-001
27-22-51-991-004
27-22-51-991-005
27-22-51-991-003
27-22-51-991-007

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Removal of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-22-51-991-001, 402/TASK 27-22-51-991-004, 403/TASK
27-22-51-991-005)
Subtask 27-22-51-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) At the trailing edge of the vertical stabilizer (1):
(a) Open the access panel 325BL (Ref. TASK 55-33-13-010-002).
(b) Remove the access panel 325BR (Ref. TASK 55-33-13-000-001).



EFF :
ALL
 27-22-51



AIJ




Page 402
Feb 01/11

Rudder Trim Actuator 10CC - Part Number 6137-3


Figure 401/TASK 27-22-51-991-001



EFF :
ALL
 27-22-51



AIJ




Page 403
May 01/08

R
R

Rigging Pin Locations for the Replacement of a Rudder Trim Actuator - Part
Number 6137-3 and 6137-4/6137-5
Figure 402/TASK 27-22-51-991-004

EFF :
ALL

Page 404


May 01/08


AIJ




27-22-51

Rudder Trim Actuator - PN 6137-4/6137-5


Figure 403/TASK 27-22-51-991-005



EFF :
ALL
 27-22-51



AIJ




Page 405
May 01/08

Subtask 27-22-51-865-056
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-22-51-860-051
C. Aircraft Maintenance Configuration
R
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.
(a) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).



EFF :
ALL
 27-22-51



AIJ




Page 406
May 01/08

(7) Put a WARNING NOTICE(S) in position to tell persons not to operate


the Green, the Blue and the Yellow hydraulic systems:
- In the flight compartment on the hydraulic section 40VU of the
overhead panel
- On the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(8) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(9) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.

(10) Put a WARNING NOTICE(S) in the flight compartment to tell persons not
to operate the flight controls.
(11) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(Ref. Fig. 402/TASK 27-22-51-991-004)
(12) Put the PIN-RIGGING (98D27207548000) (18) in the bellcrank of the
rudder control unit.
Subtask 27-22-51-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-22-51-991-001, 403/TASK 27-22-51-991-005)
Subtask 27-22-51-020-050
A. Removal of the Rudder Trim Actuator 10CC (for part number 6137-3)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.



EFF :
ALL
 27-22-51



AIJ




Page 407
Nov 01/10

(1) Disconnect the hydraulic bracket (45) from the rudder control frame
(32):
(a) Remove the nuts (44) and the washers (43).
(b) Remove the bolts (42).
NOTE : Do not disconnect the hydraulic-line end-fittings from the
____
hydraulic bracket (45).
(2) Remove the bonding straps (41) from the rudder control frame (32):
(a) Remove the bolts (39) and the washers (40).
(b) Move the bonding straps (41) away from the rudder control frame
(32).
(c) Do not disconnect the bonding straps (41) from the structure
unless a repair or a new installation is necessary.
(3) Disconnect the rudder control frame (32) from the links (36):
(a) Remove and discard the cotter pins (33).
(b) Remove the nuts (34), the washers (35) and the bolts (37).
(c) Disengage the rudder control frame (32) from the links (36).
(d) Temporarily safety the bushes (38) in the links (36) with the
lockwire MISCELLANEOUS (Material No. 19-010).
(e) Do not disconnect the links (36) from the support brackets of the
structure unless a repair or a new installation is necessary.
(4) Remove the rudder trim actuator (3):
(a) Before you disconnect the electrical connectors, put
identification on them. This is important for the subsequent
installation procedure.
(b) Disconnect the electrical connectors (14) from the plugs (13) on
the rudder trim actuator (3).
(c) Put blanking caps on the plugs (13) of the rudder trim actuator
(3) and the electrical connectors (14).



EFF :
ALL
 27-22-51


R 
AIJ




Page 408
Nov 01/10

(d) Do not disconnect the bonding strap (15) from the electrical
connector (14) unless a repair or a new installation is
necessary.

(e) If you must install a rudder trim actuator with the part number
6137-4 or 6137-5:
1
_

Remove the bonding strap (15) from the electrical connector A


(14) and the structure.

2
_

Install the new bonding strap (15) for the rudder trim
actuator (3) (part number 6137-4 or 6137-5) at the electrical
connector A (14) and the structure.

(f) Cut, remove and discard the lockwire from the bolts (11) and
(12).

(g) Remove the bolt (11), the washer (10) and the bonding strap (9)
from the rudder trim actuator (3).

(h) Do not disconnect the bonding strap (9) from the bracket (4)
unless a repair or a new installation is necessary.

(i) Remove the bolts (12) and the washers (10) from the rudder trim
actuator (3).

(j) Move the rudder trim actuator (3) down and disengage the splined
shaft (7) from the universal joint (6).

(k) Carefully move the lower part of the rudder control frame (32)
rearward.

(l) Remove the rudder trim actuator (3) to the right side.
(5) If you install the same rudder trim actuator (3) again, do these
steps:
(a) Make sure that the mobile red index is in the zero position on
the position indicator of the rudder trim actuator.
(Ref. Fig. 404/TASK 27-22-51-991-003)
(b) Cut, remove and discard the lockwire from the blanking plug (16).
(c) Remove the blanking plug (16) from the rigging hole of the rudder
trim actuator (3).



EFF :
ALL
 27-22-51



AIJ




Page 409
May 01/10

Position Indicator of the Rudder Trim Actuator - Part Number 6137-3


Figure 404/TASK 27-22-51-991-003


EFF :
ALL
 27-22-51


R 
AIJ




Page 410
May 01/10

(d) Install the PIN-LOCKING (6137-013) (19) in the rigging hole of


the rudder trim actuator (3).
(e) Install the blanking plug (16) in the storage hole of the rudder
trim actuator (3).
Subtask 27-22-51-020-052
R
R

B. Removal of the Rudder Trim Actuator 10CC (for part numbers 6137-4 or
6137-5)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
(1) Disconnect the hydraulic bracket (45) from the rudder control frame
(32):
(a) Remove the nuts (44) and the washers (43).
(b) Remove the bolts (42).
NOTE : Do not disconnect the hydraulic-line end-fittings from the
____
hydraulic bracket (45).
(2) Remove the bonding straps (41) from the rudder control frame (32):
(a) Remove the bolts (39) and the washers (40).
(b) Move the bonding straps (41) away from the rudder control frame
(32).
(c) Do not disconnect the bonding straps (41) from the structure
unless a repair or a new installation is necessary.
(3) Disconnect the rudder control frame (32) from the links (36):
(a) Remove and discard the cotter pins (33).
(b) Remove the nuts (34), the washers (35) and the bolts (37).
(c) Disengage the rudder control frame (32) from the links (36).
(d) Temporarily safety the bushes (38) in the links (36) with the
lockwire MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-22-51



AIJ




Page 411
May 01/10

(e) Do not disconnect the links (36) from the support brackets of the
structure unless a repair or a new installation is necessary.
(4) Remove the rudder trim actuator (3):
R
R
R

(a) Before you disconnect the electrical connectors, put


identification on them. This is important for the subsequent
installation procedure.

(b) Disconnect the electrical connectors (14) from the plugs on the
rudder trim actuator (3).

R
R

(c) Put blanking caps on the plugs (13) of the rudder trim actuator
(3) and the electrical connectors (14).

(d) Do not disconnect the bonding strap (15) from the electrical
connector (14) unless a repair or a new installation is
necessary.

(e) Cut, remove and discard the lockwire from the bolts (11) and
(12).

(f) Remove the bolt (11), the washer (10) and the bonding strap (9)
from the rudder trim actuator (3).

(g) Do not disconnect the bonding strap (9) from the bracket (4)
unless a repair or a new installation is necessary.

(h) Remove the bolts (12) and the washers (10) from the rudder trim
actuator (3).

(i) Move the rudder trim actuator (3) down and disengage the splined
shaft (7) from the universal joint (6).

(j) Carefully move the lower part of the rudder control frame (32)
rearward.

(k) Remove the rudder trim actuator (3) to the right side.
(5) If you will install the same rudder trim actuator (3), do the
subsequent steps:
(a) Make sure that the mobile red index is in the zero position on
the position indicator of the rudder trim actuator.
(Ref. Fig. 405/TASK 27-22-51-991-007)



EFF :
ALL
 27-22-51



AIJ




Page 412
May 01/10

Position Indicator of the Rudder Trim Actuator - PN 6137-4/6137-5


Figure 405/TASK 27-22-51-991-007


EFF :
ALL
 27-22-51


R 
AIJ




Page 413
May 01/10

(b) Cut, remove and discard the lockwire from the plug in the rigging
hole of the rudder trim actuator (3).
(c) Remove the plug from the rigging hole of the rudder trim actuator
(3).
(d) Install the PIN - LOCKING (6137-060) (19) in the rigging hole of
the rudder trim actuator (3).



EFF :
ALL
 27-22-51


R 
AIJ




Page 414
May 01/10

TASK 27-22-51-400-001
Installation of the Rudder Trim Actuator (10CC)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
6137-013
6137-060
98D27207548000

2 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


2 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 PIN-LOCKING
2 PIN - LOCKING
1 PIN-RIGGING



EFF :
ALL
 27-22-51



AIJ




Page 415
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-002
Material No. 19-010

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
22-96-00-710-001
22-97-00-710-001
24-41-00-862-002
27-22-00-710-002
27-24-00-710-001
29-00-00-864-001
55-33-13-000-001
55-33-13-010-002
55-33-13-400-001
55-33-13-410-002
27-22-51-991-001
27-22-51-991-004
27-22-51-991-005
27-22-51-991-007

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the AFS
Operational Test of the LAND CAT III Capability
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Rudder Trim Actuation
Operational Test of the Rudder Hydraulic Actuation
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Installation of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401
Fig. 402
Fig. 403
Fig. 405



EFF :
ALL
 27-22-51


R 
AIJ




Page 416
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-22-51-991-001, 402/TASK 27-22-51-991-004, 403/TASK
27-22-51-991-005)
Subtask 27-22-51-860-055
A. Aircraft Maintenance Configuration (for part number 6137-3)
(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the access panel 325BL is open (Ref. TASK 55-33-13010-002).
(3) Make sure that the access panel 325BR is removed (Ref. TASK 55-33-13000-001).
(4) Make sure that the rudder pedals are in the neutral position.
R

(5) Make sure that the WARNING NOTICE(S) is in position in the cockpit to
tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).

(8) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(9) Make sure that the PIN-RIGGING (98D27207548000) (18) is in position
in the bellcrank of the rudder control unit.
(10) Make sure that the PIN-LOCKING (6137-013) (19) is installed in the
rigging hole of the replacement rudder trim actuator (3).



EFF :
ALL
 27-22-51



AIJ




Page 417
Nov 01/10

Subtask 27-22-51-860-056
B. Aircraft Maintenance Configuration (for part numbers 6137-4 or 6137-5)
(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at the zone 325.
(2) Make sure that the access panel 325BL is open (Ref. TASK 55-33-13010-002).
(3) Make sure that the access panel 325BR is removed (Ref. TASK 55-33-13000-001).
(4) Make sure that the rudder pedals are in the neutral position.
R

(5) Make sure that the WARNING NOTICE(S) is in position in the cockpit to
tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).

(8) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(9) Make sure that the rigging pins are in their correct positions:
(Ref. Fig. 402/TASK 27-22-51-991-004)
(a) Make sure that the PIN-RIGGING (98D27207548000) (18) is in
position in the bellcrank of the rudder control unit.
(10) Make sure that the PIN - LOCKING (6137-060) (19) is installed in the
rigging hole of the replacement rudder trim actuator (3).
(Ref. Fig. 405/TASK 27-22-51-991-007)



EFF :
ALL
 27-22-51



AIJ




Page 418
Nov 01/10

Subtask 27-22-51-865-052
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-22-51-991-001, 402/TASK 27-22-51-991-004, 403/TASK
27-22-51-991-005)
Subtask 27-22-51-210-050
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Do a visual inspection of the work area.
(a) Make sure that:
- the structure of the vertical stabilizer (1)
- the structure of the rudder (2)
- the paintwork
- the bracket (4)
- the rudder trim screwjack (5)
- the universal joint (6)
- the bonding straps (9),(15)
- the electrical connectors (14)
are clean, show no corrosion and are not damaged.



EFF :
ALL
 27-22-51


R 
AIJ




Page 419
May 01/10

(2) Do a visual inspection of the bolts (11), (12) and make sure that
they are clean and show no damage.
(3) Do a visual check of the replacement rudder trim actuator (10CC) (3).
R
R
R

(a) Make sure that the rudder trim actuator (10CC) (3) is
serviceable.

R
R
R
R

(b) Make sure that the locking pin (19) is installed:


- For part number 6137-3: PIN-LOCKING (6137-013) .
- For part number 6137-4 or 6137-5: PIN - LOCKING (6137-060) .

(c) Make sure that the interface of the flange (8) is clean.
(4) Make sure that the mobile red index is in the zero position on the
position indicator of the new rudder trim actuator.

(a) If the mobile red index is not in the zero position:

R
R
R
R

1
_

Remove the locking pin (19) from the rudder trim actuator.

2
_

Turn the shaft of the rudder trim actuator in one direction


until it touches its internal mechanical stop.

3
_

Turn the shaft back 6 full turns.

4
_

Make sure that the mobile red index moves to the zero
position.

5
_

Install the locking pin (19) in the rudder trim actuator:


- For part number 6137-03 use PIN-LOCKING (6137-013).
- For part number 6137-04 or 6137-05 use PIN - LOCKING (6137060).

(5) Apply the COMMON GREASE (Material No. 04-004) to the threads of the
bolts (11),(12).
(6) Apply the COMMON GREASE (Material No. 04-004) to the splined shaft
(7).
(7) Apply the SPECIAL MATERIALS (Material No. 05-002) to the shaft of the
bolts (11),(12).



EFF :
ALL
 27-22-51



AIJ




Page 420
May 01/10

(8) Apply a thin layer of the SPECIAL MATERIALS (Material No. 05-002) to
the:
- interface of the flange (8)
- interface of the bracket (4).
(9) Make sure that the bonding area on the interface of the flange (8)
and the interface of the bracket (4) are clean.
Subtask 27-22-51-420-050
R

B. Installation of the Rudder Trim Actuator 10CC (for part number 6137-3)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
(1) Install the rudder trim actuator (3):
(a) Carefully move the lower part of the rudder control frame (32)
rearward.
(b) Install the rudder trim actuator (3) from the right side.
(c) Put the rudder trim actuator (3) in position at the bracket (4).
R

(d) Make sure that the mobile red index moves to the zero position.

R
R

NOTE : This workstep is important for the correct rigging of the


____
rudder (Refer to Para.4.A.(4)).

(e) Engage the splined shaft (7) with the universal joint (6).

(f) Attach the bonding strap (9) to the flange (8):


1
_

Put the bonding strap (9) in its correct installation


position.

2
_

Install the bolt (11) and the washer (10) through the bonding
strap (9), the flange (8) into the bracket (4) (Ref. TASK 2028-00-912-004).

(g) Install the bolts (12) and the washers (10) through the flange
(8) into the bracket (4).

(h) Tighten the bolts (11) and (12).



EFF :
ALL
 27-22-51



AIJ




Page 421
May 01/10

(i) Safety the bolts (11) and (12) with the lockwire MISCELLANEOUS
(Material No. 19-010).

(j) Remove the blanking caps from the plugs (13) and the electrical
connectors (14).

R
R

(k) Make sure that the electrical connectors are clean and in the
correct condition.

R
R

(l) Before you connect the electrical connectors, refer to the


identification marks.

(m) Connect the electrical connectors (14) to the plugs (13) on the
rudder trim actuator (3).

R
R

(n) Make sure that the bonding strap (15) is installed at the
electrical connector A (14) and the structure.
(2) Install the rudder control frame (32) at the links (36):
(a) Cut, remove and discard the lockwire which temporarily safetied
the sliding bushes (38) in the links (36).
(b) Put the links (36), the sliding bushes (38) and the rudder
control frame (32) in the installation position.
(c) Install the bolts (37) with the washers (35) and the nuts (34).
(d) TORQUE the nuts (34) to 1.5 m.daN (11.06 lbf.ft) and then loosen
the nuts (34), if necessary, to the subsequent cotter pin hole.
(e) Safety the nuts (34) with the new cotter pins (33).
(3) Install the bonding straps (41):
(a) Put the bonding straps (41) in position at the rudder control
frame (32).
(b) Install the bolts (39) with the washers (40) (Ref. TASK 20-28-00912-004).
(4) Connect the hydraulic bracket (45) to the rudder control frame (32):
(a) Put the hydraulic bracket (45) in the installation position.
(b) Install the bolts (42) with the washers (43) and the nuts (44).



EFF :
ALL
 27-22-51



AIJ




Page 422
May 01/10

(c) TORQUE the nuts (44) to between 0.37 and 0.48 m.daN (32.74 and
42.47 lbf.in).
R
Subtask 27-22-51-420-054
R
R

C. Installation of the Rudder Trim Actuator 10CC (for part number 6137-4 or
6137-5)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
(1) Preparation for installation:
(a) Make sure that the new bonding strap (15) (for the rudder trim
actuator part number 6137-4 or 6137-5) is installed at the
electrical connector A (14) and the structure.
(2) Install the rudder trim actuator (3):
(a) Carefully move the lower part of the rudder control frame (32)
rearward.
(b) Install the rudder trim actuator (3) from the right side.
(c) Put the rudder trim actuator (3) in position at the bracket (4).
R

(d) Make sure that the mobile red index moves to the zero position.

R
R

NOTE : This workstep is important for the correct rigging of the


____
rudder (Refer to Para.4.A.(4)).

(e) Engage the splined shaft (7) with the universal joint (6).

(f) Attach the bonding strap (9) to the flange (8):


1
_

Put the bonding strap (9) in its correct installation


position.

2
_

Install the bolt (11) and the washer (10) through the bonding
strap (9), the flange (8) into the bracket (4) (Ref. TASK 2028-00-912-004).



EFF :
ALL
 27-22-51



AIJ




Page 423
May 01/10

(g) Install the bolts (12) and the washers (10) through the flange
(8) into the bracket (4).

(h) Tighten the bolts (11) and (12).

(i) Safety the bolts (11) and (12) with the lockwire MISCELLANEOUS
(Material No. 19-010).

(j) Remove the blanking caps from the plugs of the rudder trim
actuator (3) and the electrical connectors (14).

R
R

(k) Make sure that the electrical connectors are clean and in the
correct condition.

R
R

(l) Before you connect the electrical connectors, refer to the


identification marks.

(m) Connect the electrical connectors (14) to the plugs on the rudder
trim actuator (3).

R
R
R

(n) Make sure that the bonding strap (15) is installed at the
electrical connector A (14) and the structure.
(3) Install the rudder frame (32) at the links (36):
(a) Cut, remove and discard the lockwire which temporarily safetied
the sliding bushes (38) in the links (36).
(b) Put the links (36), the sliding bushes (38) and the rudder
control frame (32) in the installation position.
(c) Install the bolts (37) with the washers (35) and the nuts (34).
(d) TORQUE the nuts (34) to 1.5 m.daN (11.06 lbf.ft) and then loosen
the nuts (34), if necessary, until you see a cotter pin hole.
(e) Safety the nuts (34) with the new cotter pins (33).
(4) Install the bonding straps (41):
(a) Put the bonding straps (41) in position at the rudder control
frame (32).
(b) Install the bolts (39) with the washers (40) (Ref. TASK 20-28-00912-004).



EFF :
ALL
 27-22-51



AIJ




Page 424
May 01/10

(5) Install the hydraulic bracket (45) to the rudder control frame (32):
(a) Put the hydraulic bracket (45) in the installation position.
(b) Install the bolts (42) with the washers (43) and the nuts (44).
(c) TORQUE the nuts (44) to between 0.37 and 0.48 m.daN (32.74 and
42.47 lbf.in).
R
Subtask 27-22-51-865-051
R

D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-22-51-860-053

E. Preparation for the Test (for part number 6137-03)


WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
R

(1) Remove the PIN-RIGGING (98D27207548000) (18) from the bellcrank of


the rudder control unit.
(2) Remove the PIN-LOCKING (6137-013) (19) from the rudder trim actuator
(3).
(3) Remove the blanking plug (16) from the storage hole of the rudder
trim actuator (3).
(4) Make sure that the O-ring on the blanking plug (16) is installed and
in good condition.



EFF :
ALL
 27-22-51



AIJ




Page 425
May 01/10

(5) Install the blanking plug (16) in the rigging hole of the rudder trim
actuator (3).
(6) TORQUE the blanking plug (16) to 0.10 m.daN (8.84 lbf.in).
(7) Safety the blanking plug (16) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(8) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(9) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.
Subtask 27-22-51-860-057
R

F. Preparation for the Test (for part number 6137-4 or 6137-5)


WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
R

(1) Remove the PIN-RIGGING (98D27207548000) (18) from the bellcrank of


the rudder control unit.
(2) Remove the PIN - LOCKING (6137-060) (19) from the rudder trim
actuator (3).
(3) Make sure that the O-ring on the plug is installed and in good
condition.
(4) Install the plug in the rigging hole of the rudder trim actuator (3).
(5) Safety the plug (16) with the lockwire, MISCELLANEOUS (Material No.
19-010).
(6) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(7) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.



EFF :
ALL
 27-22-51



AIJ




Page 426
May 01/10

Subtask 27-22-51-720-052
G. Test
(1) Do the operational test of the rudder trim actuation (Ref. TASK 2722-00-710-002).
(2) Make sure that the pin locking (19) is removed before you do the
operational test of the rudder trim actuation.
(3) If you operate the aircraft in actual CAT 3 conditions, do these
tests:
- AFS-Test (Ref. TASK 22-96-00-710-001) and Land Test (Ref. TASK 2297-00-710-001).
(4) Do the operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).
(5) Make sure that there are no hydraulic leaks in the area of the rudder
control frame (32).
5. Close-up
________
Subtask 27-22-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel 325BR at the trailing edge of the vertical
stabilizer (Ref. TASK 55-33-13-400-001).
(3) Close the access panel 325BL at the trailing edge of the vertical
stabilizer (Ref. TASK 55-33-13-410-002).
(4) Remove the warning notice(s).
(5) Remove the access platform(s).



EFF :
ALL
 27-22-51


R 
AIJ




Page 427
Nov 01/10

TASK 27-22-51-000-002
Removal of the Electronic Assembly of the Rudder Trim Actuator (10CC)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : This procedure is only applicable to rudder trim actuator partnumber
____
6137-3. For other partnumbers refer to the rudder trim actuator
removal/installation.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
6137-013

blanking caps
circuit breaker(s) safety clip(s)
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 WARNING NOTICE(S)
1 PIN-LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply



EFF :
ALL
 27-22-51



AIJ




Page 428
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------55-33-13-000-001
55-33-13-010-002
27-22-51-991-002

Removal of the Trailing Edge Access-Panels 325EL,


325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 406

3. __________
Job Set-up
(Ref. Fig. 406/TASK 27-22-51-991-002)
Subtask 27-22-51-010-051
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
(3) Open the access panel 325BL (Ref. TASK 55-33-13-010-002) at the
trailing edge of the vertical stabilizer.
(4) Remove the access panel 325BR (Ref. TASK 55-33-13-000-001).
Subtask 27-22-51-865-057
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-22-51



AIJ




Page 429
Feb 01/11

Electronic Assembly of the Rudder Trim Actuator 10CC - Part Number 6137-3
Figure 406/TASK 27-22-51-991-002


EFF :
ALL
 27-22-51


R 
AIJ




Page 430
May 01/10

Subtask 27-22-51-860-052
C. Aircraft Maintenance Configuration
NOTE : The worksteps that follow are necessary if you remove the
____
electronic assembly of a rudder trim actuator with the part number
6137-3.
(1) Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861002)
(2) Pressurize the Blue hydraulic system
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.
(a) Pressurize the Blue hydraulic system with the electric pump
(Ref. TASK 29-10-00-863-003).
(3) Put the rudder pedals in the neutral position.
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Depressurize the Blue hydraulic system and put it in the maintenance
configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(7) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(8) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
R

(9) Put the WARNING NOTICE(S) in the flight compartment to tell persons
not to operate the flight controls.
(10) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)



EFF :
ALL
 27-22-51



AIJ




Page 431
Nov 01/10

(11) Put the WARNING NOTICE(S) in position to tell persons not to operate
the Green, the Blue and the Yellow hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(12) Put the PIN-RIGGING (98D27207547000) (1) in the rudder cable
quadrant.
(13) Put the PIN-RIGGING (98D27207548000) (2) in the bellcrank of the
rudder control unit.
(14) Remove and discard the lockwire from the blanking plug (4).
(15) Remove the blanking plug (4) from the rigging hole of the rudder trim
actuator (10).
(16) Install the PIN-LOCKING (6137-013) (3) in the rigging hole of the
rudder trim actuator (10).
(17) Install the blanking plug (4) in the storage hole of the rudder trim
actuator (10).
Subtask 27-22-51-865-053
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 406/TASK 27-22-51-991-002)
Subtask 27-22-51-020-051
A. Removal of the Electronic Assembly
NOTE : The worksteps that follow are necessary if you remove the
____
electronic assembly of a rudder trim actuator with the part number
6137-3.



EFF :
ALL
 27-22-51



AIJ




Page 432
Nov 01/10

(1) Disconnect the electrical connectors (7) from the plugs (8) on the
rudder trim actuator 10CC (10).
(2) Put blanking caps on the plugs (8) and the electrical connectors (7).
(3) Cut and remove the lockwire from the screws (9).
(4) Hold the electronic assembly (6) and remove the screws (9).
(5) Remove the electronic assembly (6) from the rudder trim actuator
(10).
(6) Remove and discard the packing (5).



EFF :
ALL
 27-22-51


R 
AIJ




Page 433
May 01/10

TASK 27-22-51-400-002
Installation of the Electronic Assembly of the Rudder Trim Actuator (10CC)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
NOTE : This procedure is only applicable to rudder trim actuator partnumber
____
6137-3. For other partnumbers refer to the rudder trim actuator
removal/installation.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
6137-013

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-LOCKING



EFF :
ALL
 27-22-51



AIJ




Page 434
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-96-00-710-001
22-97-00-710-001
27-22-00-710-002
29-00-00-864-001
55-33-13-000-001
55-33-13-010-002
55-33-13-400-001
55-33-13-410-002
27-22-51-991-004
27-22-51-991-002

Operational Test of the AFS


Operational Test of the LAND CAT III Capability
Operational Test of the Rudder Trim Actuation
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Installation of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 402
Fig. 406

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-22-51-991-004, 406/TASK 27-22-51-991-002)
Subtask 27-22-51-860-050
A. Aircraft Maintenance Configuration
NOTE : The worksteps that follow are necessary if you install the
____
electronic assembly of a rudder trim actuator with the part number
6137-3.



EFF :
ALL
 27-22-51


R 
AIJ




Page 435
May 01/10

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(2) Make sure that the access door 312AR is open.
(3) Make sure that the access panel 325BL is open (Ref. TASK 55-33-13010-002).
(4) Make sure that the access panel 325BR is removed (Ref. TASK 55-33-13000-001).
(5) Make sure that the rudder pedals are in the neutral position.
R

(6) Make sure that the WARNING NOTICE(S) are in the flight compartment to
tell persons not to operate the flight controls.
(7) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).

(8) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(9) Make sure that the red painted marks on the tail cone and the
trailing edge of the rudder are aligned.
(10) Make sure that the PIN-RIGGING (98D27207547000) (1) is put in the
rudder cable quadrant.
(11) Make sure that the PIN-RIGGING (98D27207548000) (2) is put in the
bellcrank of the rudder control unit.
(12) Make sure that the PIN-LOCKING (6137-013) (7) is put in the rudder
trim actuator 10CC (8).



EFF :
ALL
 27-22-51



AIJ




Page 436
Nov 01/10

Subtask 27-22-51-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-22-51-420-051
A. Installation of the Electronic Assembly of the Rudder Trim Actuator 10CC
NOTE : The worksteps that follow are necessary if you install the
____
electronic assembly of a rudder trim actuator with the part number
6137-3.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the electrical connections of the electronic assembly
(6) and of the rudder trim actuator (10) are clean, show no corrosion
and are not damaged.
(4) Put the new packing (5) in position on the electronic assembly (6).
(5) Put the electronic assembly (6) in position on the rudder trim
actuator 10CC (10) and install the screws (9).
(6) Make sure that the packing (5) is in the correct position.
(7) Safety the screws (9) with the lockwire MISCELLANEOUS (Material No.
19-010).
(8) Remove the blanking caps from the plugs (8) and the electrical
connectors (7).
(9) Connect the electrical connectors (7) to the plugs (8) on the rudder
trim actuator 10CC (10).



EFF :
ALL
 27-22-51


R 
AIJ




Page 437
May 01/10

Subtask 27-22-51-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-22-51-860-054
C. Preparation for the Test
NOTE : The worksteps that follow are necessary if the installed
____
electronic assembly is related to a rudder trim actuator with the
part number 6137-3.
R

(1) Remove the PIN-RIGGING (98D27207548000) (2) from the bellcrank of the
rudder control unit.

(2) Remove the PIN-RIGGING (98D27207547000) (1) from the rudder cable
quadrant.
(3) Remove the PIN-LOCKING (3) from the rudder trim actuator (10).
(4) Remove the blanking plug (4) from the storage hole of the rudder trim
actuator (10).
(5) Make sure that the O-ring on the blanking plug (4) is installed and
in good condition.
(6) Install the blanking plug (4) in the rigging hole of the rudder trim
actuator (10).
(7) TORQUE the blanking plug (4) to to 0.10 m.daN (8.84 lbf.in).
(8) Safety the blanking plug (4) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(9) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch.
The OFF legend goes off.
(10) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch.
The OFF legend goes off.



EFF :
ALL
 27-22-51



AIJ




Page 438
May 01/10

Subtask 27-22-51-720-051
D. Do the operational test of the rudder trim actuation (Ref. TASK 27-22-00710-002).
NOTE : If you operate the aircraft in actual CAT 3 conditions, do these
____
tests:
- AFS-Test (Ref. TASK 22-96-00-710-001) and Land Test (Ref. TASK
22-97-00-710-001).
5. Close-up
________
Subtask 27-22-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Install the access panel 325BR (Ref. TASK 55-33-13-400-001).
(4) Close the access panel 325BL at the trailing edge of the vertical
stabilizer (Ref. TASK 55-33-13-410-002).
(5) Remove the warning notice(s).
(6) Remove the access platform(s).



EFF :
ALL
 27-22-51


R 
AIJ




Page 439
May 01/10

______________________________________________________
ARTIFICIAL
FEEL AND RUDDER TRAVEL LIMITING - ACTUATION
DESCRIPTION AND OPERATION
_________________________
1. General
_______
A. Rudder Artificial Feel
(Ref. Fig. 001)
An artificial feel and trim unit is installed downstream of the cable
quadrant.
It consists of a trim screwjack (Ref. 27-22) and a constant-resisting
load spring-rod that the trim screwjack holds in the neutral position.
The artificial feel and trim unit also comprises a system which overrides
the autopilot.
This system is engaged when the AP mode is selected.
The function of the spring rod is:
- to provide an artificial feel load proportional to the rudder
deflection,
- to provide an accurate centering of the surface to neutral in the
absence of a control input,
- to hold the upstream control at neutral when the yaw damper
servoactuator supplies signals to the servocontrol.
NOTE : The centering spring force is added to the artificial feel force
____
that the artificial feel and trim unit supplies (Ref. 27-21).
B. Rudder Travel Limiting
(Ref. Fig. 002)
The rudder-travel limiting system limits the control inputs to the
servocontrols to change the rudder travel in relation to the airspeed
(Vc).
The limitation is such that the maximum deflection of the rudder remains
lower than the deflection which would induce limit loads on the
structure, throughout the flight envelope.
The system is made of a travel limitation unit which is under the control
of the Flight Augmentation Computers (FACs) (Ref. ch. 22).
A simplified emergency control system (open loop) brings back
automatically the stops to the low-speed position when the two FACs are
failed and slats are extended.



EFF :
ALL
 27-23-00



AIJ




Page 1
Feb 01/07

2. __________________
Component Location
A. Rudder Artificial Feel
(Ref. Fig. 003)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------ARTIFICIAL FEEL AND TRIM UNIT
325
27-23-41
16CA
SOLENOID-RUDDER ARTF FEEL
325
22-31-00



EFF :
ALL
 27-23-00



AIJ




Page 2
Feb 01/07

Artificial Feel and Trim Unit


Figure 001

EFF :
ALL
 27-23-00




AIJ




Page 3/4
Feb 01/07

Rudder-Travel Limiting System


Figure 002


EFF :
ALL
 27-23-00



AIJ




Page 5
Feb 01/07

Location of the Artificial Feel and Trim Unit


Figure 003


EFF :
ALL
 27-23-00



AIJ




Page 6
Feb 01/07

B. Rudder Travel Limiting


(Ref. Fig. 004)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------4CC
LIMITATION UNIT-RUDDER TRAVEL
325 325DL
27-23-51



EFF :
ALL
 27-23-00



AIJ




Page 7
Feb 01/07

Travel Limitation Unit - Location


Figure 004


EFF :
ALL
 27-23-00



AIJ




Page 8
Feb 01/07

C. Maintenance and Rigging Facilities.


The item given below is a Line Replaceable Unit (LRU):
- Electronic assembly
The levers and the casing have rigging holes which materialize the
neutral position of the levers, for adjustment of the rods connected to
them.
3. _____________________
Component Description
A. Rudder-Travel Limitation Unit (TLU)
(Ref. Fig. 004)
(1) General
The mechanical design of the TLU is such that a single mechanical
failure (rupture or disconnection) cannot cause the loss of the
travel limitation function.
The TLU has two brushless electric motors separately controlled by an
electronic assembly.
Each motor drives two screws via a reduction gear and permits the
symmetrical linear displacement of two nuts used as adjustable stops.
(The two nuts have opposite pitches).
A non-locking rotary stop limits the stroke of one of the screw/nut
assemblies which are irreversible.
There are two levers on each connection shaft; one is connected to
the input rod and the other is used as a punctual stop.
The movement of each screw is transmitted to a transducer unit (RVDT)
via a reduction gear which permits to indicate the position of the
variable stop.
Two rigging pins are used to set the two levers to the zero position
(mid stroke).
To prevent icing, there is a heating system which includes two coils
and their regulating thermostats.
B. Normal control circuit
(Ref. Fig. 005)
The motor itself is a 3-phase asynchronous motor with no brushes:
- the associated electronic set supplies the motor windings with variable
voltage and variable frequency which are function of the input signal
(representative of the position error),
- the system permits to get torque/speed characteristics for the motor
equivalent to those obtained with a DC motor,
- a relay isolates the motor windings from the electronic set output when
its coil is not energized by the enable signal.
Moreover, in this situation, the output signals are sent back to the
monitoring circuits for comparison with fixed thresholds



EFF :
ALL
 27-23-00



AIJ




Page 9
Feb 01/07

Electronic Assembly
Figure 005


EFF :
ALL
 27-23-00



AIJ




Page 10
Feb 01/07

- the command signal that the computer dedicated to each electronic set
sends is a DC current which varies between plus or minus 8 mA into a
500-ohm resistor (for the computer, the motor is equivalent to a
standard servovalve),
- another relay upstream of the actuator and controlled by the computer
supplies the 28VDC power.
C. Emergency control circuit
(Ref. Fig. 005)
When the two FACs can no longer achieve normal control (for example if
the two electronic power sets of the TLU are failed), an emergency
control brings back the stops to the low speed configuration (maximum
possible deflection of the rudder) when slats are extended.
For this, the motor is used as a 2-phase asynchronous motor energized by
26 V 400 Hz power.
This control mode is achieved when the coil of a specific relay is
energized for a period of 30 s approx (this time is greatly sufficient to
bring back the stops to the low speed configuration).
The motor is then able to sustain the energization of the windings during
a long period, without any rotation, because the stops are reached.
4. ____
Test
(Ref. Fig. 005)
At FAC energization a test is initiated to do the check of at lest 95% of
the electronic circuitry without the need of motor rotation.
For this, the test circuitry which receives the output signals when the
isolation relay is de-energized compares these signals to two thresholds.
It also energizes a specific relay when the signals correspond to a
particular value of the input signal.
One pole of this relay sends a logic information (fault signal) to the
upstream computer.
- first phase:
the enable signal is equal to zero,
the command signal is equal to zero.
The computer must verify a logic zero on the fault output (open line).
This test proves that the logic output is not permanently set to 1 and that
the isolation relay is not closed.
- second phase:
the enable signal is equal to zero,
the command signal is equal to the value which corresponds to the
threshold setting.
Then, the computer must verify a logic 1 (ground).
This proves that:
the isolation relay is really open,
the electronic circuitry operates as designed.
- third phase:
the isolation relay is energized,



EFF :
ALL
 27-23-00



AIJ




Page 11
Feb 01/07

the input signal is equal to zero.


The computer must then verify a logic 1 (the test logic takes into account
the position of a pole of the isolation relay).
The purpose of this third phase is to prove that the isolation relay is able
to close when energized.
NOTE : When the motor is in service there is a monitoring of the current in
____
the windings. If an overcurrent is detected it is indicated by the
fault signal (open circuit whereas in normal conditions it should be
a ground).



EFF :
ALL
 27-23-00



AIJ




Page 12
Feb 01/07

______________________________________________________
ARTIFICIAL
FEEL AND RUDDER TRAVEL LIMITING - ACTUATION
_________________________
DEACTIVATION/REACTIVATION
TASK 27-23-00-040-001
Deactivation of the Channel 1 of the Rudder Travel Limitation Unit
1. __________________
Reason for the Job
R
R
R

Refer to the MMEL TASK: 22-60-01-A)


FAC 1
(Old MMEL ref: 22-66-01-A))
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-23-00-710-002

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Operational Test of the Rudder-Travel Limitation Unit

3. __________
Job Set-up
Subtask 27-23-00-860-055
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).



EFF :
ALL
 27-23-00



AIJ




Page 401
May 01/11

Subtask 27-23-00-010-052
B. Get access to the Avionics Compartment
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the
access door 824.
(2) Open the access door 824.
Subtask 27-23-00-865-052
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
4. Procedure
_________
Subtask 27-23-00-040-050
A. Deactivation of the Channel 1 of the Rudder Travel Limitation Unit
(1) On the panel 187VU, remove the relay 13CC1.
(2) Remove the safety clip(s) and the tag(s) and close this(these)
circuit breaker(s):
5CC1.
Subtask 27-23-00-710-055
B. Do the operational test of the rudder travel limitation unit (Ref. TASK
27-23-00-710-002).
5. Close-up
________
Subtask 27-23-00-941-050
A. Safety Precautions
(1) Put a warning notice in the cockpit to tell the crew that the channel
1 of the rudder travel limitation unit is deactivated.
(2) Make an entry in the logbook.



EFF :
ALL
 27-23-00



AIJ




Page 402
Feb 01/11

Subtask 27-23-00-410-052
B. Close Access
(1) Close the access door 824.
(2) Remove the access platform(s).
Subtask 27-23-00-862-052
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)



EFF :
ALL
 27-23-00


R 
AIJ




Page 403
Feb 01/07

TASK 27-23-00-440-001
Reactivation of the Channel 1 of the Rudder Travel Limitation Unit
1. __________________
Reason for the Job
R
R
R

Refer to the MMEL TASK: 22-60-01-A)


FAC 1
(Old MMEL ref: 22-66-01-A))
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
TSM

22

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
(for corrective action)

3. __________
Job Set-up
Subtask 27-23-00-860-056
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 27-23-00-010-053
B. Get access to the Avionics Compartment
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the
access door 824.
(2) Open the access door 824.



EFF :
ALL
 27-23-00



AIJ




Page 404
May 01/11

Subtask 27-23-00-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
4. Procedure
_________
Subtask 27-23-00-440-050
A. Reactivation of the Channel 1 of the Rudder Travel Limitation Unit
(1) On the panel 187VU, install the relay 13CC1.
(2) Remove the safety clip(s) and the tag(s) and close this(these)
circuit breaker(s):
5CC1.
Subtask 27-23-00-810-050
B. Do the trouble shooting of the rudder travel limitation unit you
deactivated (Ref. TSM 22)
5. Close-up
________
Subtask 27-23-00-410-053
A. Close Access
(1) Close the access door 824.
(2) Remove the access platform(s).
Subtask 27-23-00-862-053
B. Put the aircraft back to its initial configuration.
(1) Remove the warning notice(s).
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).



EFF :
ALL
 27-23-00


R 
AIJ




Page 405
Feb 01/07

ARTIFICIAL FEEL AND RUDDER TRAVEL LIMITING - ACTUATION - ADJUSTMENT/TEST


________________________________________________________________________
TASK 27-23-00-710-001
Operational Test of the Rudder Artificial-Feel Loads with Tool (355M03200001)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
To make sure that the operation of the artificial feel unit of the rudder is
correct in manual mode and when the autopilot operates.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
355M03200001

blanking caps
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 TOOL-28 VDC POWER SUPPLY



EFF :
ALL
 27-23-00



AIJ




Page 501
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-10-00-710-002
24-41-00-861-002

Operational Test of Autopilot Disengagement and


Locking Devices of the Side Stick Controller and
Rudder Pedals
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
(for corrective action)
Fig. 501

24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
55-33-13-010-001
55-33-13-410-001
R

TSM 272000810805
27-23-00-991-001-A
3. __________
Job Set-up
Subtask 27-23-00-010-051-A
A. Get Access

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at the zone 325.
(2) Open the access panel 325BL (Ref. TASK 55-33-13-010-001).

(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at the zone 312.
(4) Open the access door 312AR to get access to the +28VDC supply



EFF :
ALL
 27-23-00



AIJ




Page 502
Feb 01/11

Subtask 27-23-00-480-051-A
B. Installation of the Test Tool
(Ref. Fig. 501/TASK 27-23-00-991-001-A)
(1) Disconnect the electrical connector (1) from the rudder
artificial_feel solenoid 16CA.
R

(2) Put blanking caps on the disconnected electrical connector(s).

(3) Connect the TOOL-28 VDC POWER SUPPLY (355M03200001) to the solenoid
16CA.

(4) Connect the connector of the TOOL-28 VDC POWER SUPPLY (355M03200001)
to the +28VDC connector of the aircraft.
(5) Make sure that the solenoid 16CA is not energized.
(6) Make sure that the travel ranges of the flight control surfaces are
clear.
Subtask 27-23-00-860-050
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (the FAULT and OFF legends are off).
(4) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (the FAULT and OFF legends are off).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(6) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).



EFF :
ALL
 27-23-00



AIJ




Page 503
Nov 01/10

R
R

Artificial Feel and Trim Unit


Figure 501/TASK 27-23-00-991-001-A



EFF :
ALL
 27-23-00



AIJ




Page 504
May 01/07

Subtask 27-23-00-865-050
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-23-00-710-050-A
A. Do this test :
R
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. At the CAPT or F/O seat:
- push the right pedal until it
touches the mechanical stop
(variable stop).

The rudder moves smoothly to the right.


The force you must apply increases
slowly and continuously until the pedal
touches the mechanical stop.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator
moves smoothly to the right.

2. Slowly release the right pedal and The rudder moves smoothly to the left.
push the left pedal until it
The force you must apply to the right
touches the mechanical stop
pedal decreases slowly and
(variable stop).
continuously, then becomes zero.
The force you must apply to the left
pedal increases slowly and continuously
until the pedal touches the mechanical
stop.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator
moves smoothly from the right to the
left.



EFF :
ALL
 27-23-00



AIJ




Page 505
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------3. Slowly release the left pedal.
The rudder moves to the neutral
position.
The force you must apply to the left
pedal decreases slowly and
continuously, then becomes zero.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator goes
back to neutral.
4. Energize the solenoid 16CA with
the TOOL-28 VDC POWER SUPPLY
(355M03200001).

NOTE : The solenoid of the artificial


____
feel unit is energized.
The second spring of the
artificial feel unit is engaged.

5. At the CAPT or F/O seat :


- push the right pedal until it
touches the mechanical stop
(variable stop).

The rudder moves smoothly to the right.


The force you must apply to the pedals
is much larger :
- it is multiplied by three at the
threshold.
- it is multiplied by two at the limit
of the travel.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator
moves smoothly to the right.

6. Slowly release the right pedal and The rudder moves smoothly to the left.
push the left pedal until it
The force you must apply to the right
touches the mechanical stop
pedal decreases slowly and continuously
(variable stop).
then becomes zero.
The force you must apply to the left
pedal is much larger:
- it is multiplied by three at the
threshold.
- it is multiplied by two at the limit
of the travel.
On the lower ECAM display unit, on the
F/CTL page:



EFF :
ALL
 27-23-00


R 
AIJ




Page 506
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- the pointer of the RUD indicator
moves smoothly from the right to the
left.
7. Slowly release the left pedal.

The rudder moves to the neutral


position. The force you must apply to
the left pedal decreases slowly and
continuously, then becomes zero.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator goes
back to neutral.

8. De-energize the solenoid 16CA with ____


NOTE : The solenoid of the artificial
the TOOL-28 VDC POWER SUPPLY
feel unit is de-energized.
(355M03200001).
The second spring of the
artificial feel unit is
disengaged.
9. At the CAPT or F/O seat:
- push the right pedal until it
touches the mechanical stop
(variable stop).

The rudder moves smoothly to the right.


The force you must apply increases
slowly and continuously until the pedal
touches the mechanical stop.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator
moves smoothly to the right.

10. Slowly release the right pedal


and push the left pedal until it
touches the mechanical stop
(variable stop).

The rudder moves smoothly to the left.


The force you must apply to the right
pedal decreases slowly and
continuously, then becomes zero.
The force you must apply to the left
pedal increases slowly and continuously
until the pedal touches the mechanical
stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves smoothly from the right to the
left.



EFF :
ALL
 27-23-00


R 
AIJ




Page 507
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------11. Slowly release the left pedal.
The rudder moves to the neutral
position.
The force you must apply to the left
pedal decreases slowly and
continuously, then becomes zero.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator goes
back to neutral.
NOTE : If the feel loads are not satisfactory:
____
(Ref. TSM 272000810805).

R
R

5. Close-up
________
Subtask 27-23-00-860-051
A. Aircraft Maintenance Configuration
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-23-00-080-051-A
B. Removal of the Test Tool
(Ref. Fig. 501/TASK 27-23-00-991-001-A)
(1) Remove the TOOL-28 VDC POWER SUPPLY (355M03200001).
(2) Make sure that the electrical connector is serviceable.
(3) Connect the electrical connector (1) to the solenoid 16CA.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-23-00



AIJ




Page 508
Feb 01/11

Subtask 27-23-00-410-051-A

C. Close Access

(1) Close the access panel 325BL (Ref. TASK 55-33-13-410-001)

(2) Close the access door 312AR.

(3) Remove the access platform(s).

Subtask 27-23-00-710-053-A

D. Test of the Autopilot Disengagement

R
R

(1) Do the test of the autopilot disengagement (Ref. TASK 22-10-00-710002)

R
R

NOTE : Do the test of the autopilot disengagement only for the


____
pedals.



EFF :
ALL
 27-23-00



AIJ




Page 509
May 01/07

TASK 27-23-00-710-001- 01
Operational Test of the Rudder Artificial-Feel Loads without Tool
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
To make sure that the operation of the artificial feel unit of the rudder is
correct in manual mode and when the autopilot operates.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

3 WARNING NOTICE(S)



EFF :
ALL
 27-23-00



AIJ




Page 510
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
34-10-00-860-004
34-10-00-860-005
TSM 272000810805

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
IR Alignment Procedure
ADIRS Stop Procedure
(for corrective action)

3. __________
Job Set-up
Subtask 27-23-00-860-057
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU:
- Make sure that the ELAC 1, SEC 1 and FAC 1 pushbutton switches are
pushed (the FAULT and OFF legends are off).
(3) On the overhead panel 24VU:
- Make sure that the ELAC 2, SEC 2, SEC 3 and FAC 2 pushbutton
switches are pushed (the FAULT and OFF legends are off).
(4) On the overhead panel 20VU, on the ADIRS CDU:
- Set the 3 OFF/NAV/ATT selector switches to NAV (Ref. TASK 34-10-00860-004).



EFF :
ALL
 27-23-00



AIJ




Page 511
Feb 01/11

(5) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(6) On the center pedestal, on the panel 110VU:
- Make sure that the RUD TRIM indicator shows 0.
(7) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(8) On the center pedestal, on the ECAM control panel:
- Push the F/CTL key (on the lower ECAM display unit, the F/CTL page
comes into view).
R

(9) Put a WARNING NOTICE(S) in position to tell persons not to use these
controls:
- The CAPT and F/O side sticks
- The RUD TRIM control switch on the panel 110VU.
Subtask 27-23-00-865-054
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FCU/1
9CA1
B05
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
49VU AUTO FLT/MCDU/1
11CA1
B01
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
121VU AUTO FLT/FCU/2
9CA2
M21
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU AUTO FLT/MCDU/2
11CA2
N20
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34



EFF :
ALL
 27-23-00



AIJ




Page 512
Nov 01/10

4. Procedure
_________
Subtask 27-23-00-710-056
A. Do this test :
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. At the CAPT or F/O seat:
- Push the right pedal until it
touches the mechanical stop
(variable stop).

The rudder moves smoothly to the right.


The force you must apply increases
slowly and continuously until the pedal
touches the mechanical stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the right.

2. Slowly release the right pedal and The rudder moves smoothly to the left.
push the left pedal until it
The force you must apply to the right
touches the mechanical stop
pedal decreases slowly and
(variable stop).
continuously, then becomes zero.
The force you must apply to the left
pedal increases slowly and continuously
until the pedal touches the mechanical
stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves smoothly from the right to the
left.
3. Slowly release the left pedal.

The rudder moves to the neutral


position.
The force you must apply to the left
pedal decreases slowly and
continuously, then becomes zero.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator goes
back to neutral.



EFF :
ALL
 27-23-00



AIJ




Page 513
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------4. Engage the autopilot, on the FCU: The green lines of this pushbutton
- Push the AP1 (AP 2) pushbutton
switch come on.
switch.
NOTE : The solenoid of the artificial
____
feel unit is energized.
The second spring of the
artificial feel unit is engaged.
5. At the CAPT or F/O seat:
- Push the right pedal.

- the force you must apply to the


pedals is multiplied by three at the
threshold.
- at mid travel of the rudder, the AP
disengage.
- the force you must apply decreases
suddenly and the pedal goes to the
mechanical stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves to the right.

- Release the right pedal.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator goes
back to neutral.

6. Engage the autopilot, on the FCU:


- Push the AP1 (AP 2) pushbutton
switch.

The green lines of this pushbutton


switch come on.

7. At the same seat:


- Push the left pedal.

- the force you must apply to the


pedals is multiplied by three at the
threshold.
- at mid travel of the rudder, the AP
disengage.
- the force you must apply decreases
suddenly and the pedal goes to the
mechanical stop.
On the lower ECAM display unit, on the
F/CTL page:



EFF :
ALL
 27-23-00


R 
AIJ




Page 514
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- the pointer of the RUD indicator
moves to the left.
- Release the right pedal.

8. At the CAPT or F/O seat:


- Push the right pedal until it
touches the mechanical stop
(variable stop).

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator goes
back to neutral.
The rudder moves smoothly to the right.
The force you must apply increases
slowly and continuously until the pedal
touches the mechanical stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the right.

9. Slowly release the right pedal and The rudder moves smoothly to the left.
push the left pedal until it
The force you must apply to the right
touches the mechanical stop
pedal decreases slowly and
(variable stop).
continuously, then becomes zero.
The force you must apply to the left
pedal increases slowly and continuously
until the pedal touches the mechanical
stop.
On the lower ECAM display unit, on the
F/CTL page:
- the pointer of the RUD indicator
moves smoothly from the right to the
left.
10. Slowly release the left pedal.

The rudder moves to the neutral


position.
The force you must apply to the left
pedal decreases slowly and
continuously, then becomes zero.
On the lower ECAM display unit, on the
F/CTL page :
- the pointer of the RUD indicator goes
back to neutral.



EFF :
ALL
 27-23-00


R 
AIJ




Page 515
Feb 01/11

NOTE : If the feel loads are not satisfactory:


____
(Ref. TSM 272000810805).

5. Close-up
________
Subtask 27-23-00-860-058
A. Aircraft Maintenance Configuration
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) On the overhead panel 20VU, on the ADIRS CDU:
- Set the 3 OFF/NAV/ATT selector switches to OFF (Ref. TASK 34-10-00860-005).
(3) Remove the warning notice(s).
(4) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(5) Remove all the fixtures, tools, test and support equipment used
during this procedure.
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-23-00



AIJ




Page 516
Feb 01/11

TASK 27-23-00-710-002
Operational Test of the Rudder-Travel Limitation Unit
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-61-00-710-001

Operational Test of the Rudder Travel Limiting


Function

3. __________
Job Set-up
Subtask 27-23-00-860-054
A. Not applicable
4. Procedure
_________
Subtask 27-23-00-710-051
A. Do the operational test of the variable stop of the rudder travel
limitation unit (Ref. TASK 22-61-00-710-001).



EFF :
ALL
 27-23-00



AIJ




Page 517
May 01/07

SOLENOID - ARTIFICIAL FEEL UNLOCKING (16CA) - REMOVAL/INSTALLATION


__________________________________________________________________
TASK 27-23-17-000-001
Removal of the Artificial Feel Unlocking Solenoid 16CA
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27207547000
98D27207548000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING
1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-23-17



AIJ




Page 401
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------53-55-12-000-001
55-33-13-010-002
R
R

27-23-17-991-002
27-23-17-991-001

Removal of the Rudder Fairings 325AL and 325AR


Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-23-17-861-050
A. Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861-002)
Subtask 27-23-17-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-17-860-051
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.



EFF :
ALL
 27-23-17



AIJ




Page 402
Feb 01/07

(4) On the overhead panel 23VU, release the FLT CTL/FAC 1 pushbutton
switch. The OFF legend comes on.
(5) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton
switch. The OFF legend comes on.
(6) Put warning notices in the flight compartment to tell persons not to
operate the flight controls.
(7) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003) .
Subtask 27-23-17-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-17-860-050
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put warning notices in position to tell persons not to operate the
Green, the Yellow and the Blue hydraulic systems.
Subtask 27-23-17-010-050
F. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.



EFF :
ALL
 27-23-17



AIJ




Page 403
Feb 01/11

(3) Open the access panel 325BL at the trailing edge of the vertical
stabilizer (1) (Ref. TASK 55-33-13-010-002).
(4) Remove the rudder fairing 325AL (Ref. TASK 53-55-12-000-001).
Subtask 27-23-17-480-050
G. Installation of the Rigging Pins
(Ref. Fig. 401/TASK 27-23-17-991-002)
R

(1) Put the PIN-RIGGING (98D27207547000) (51) in the rudder cable


quadrant.

(2) Put the PIN-RIGGING (98D27207548000) (50) in the bellcrank of the


rudder control unit.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-23-17-991-001)
Subtask 27-23-17-020-050
A. Removal of the Artificial-Feel Unlocking-Solenoid 16CA
(1) Disconnect the electrical connector (26) from the receptacle (25) of
the solenoid 16CA (3).
NOTE : Do not disconnect the bonding strap (27) from the electrical
____
connector (26) unless a repair or a new installation is
necessary.
(2) Put the blanking caps on the electrical connector (26) and the
receptacle (25).
(3) Disconnect the lever arm (11) from the artificial feel unit (4).
(a) Remove and discard the cotter pin (14).

R
R

(b) Remove the nut (13), the washers (12), (33), the bush (32) and
the bolt (9).
(c) Move the shaft (31) of the artificial feel unit (4) away from the
lever arm (11).
NOTE : Let the artificial feel unit (4) move at the universal
____
joint (5) until:
- The cover (6) is away from the lever arm (11).



EFF :
ALL
 27-23-17



AIJ




Page 404
Nov 01/10

R
R

Location of Rigging Pins


Figure 401/TASK 27-23-17-991-002



EFF :
ALL
 27-23-17



AIJ




Page 405
Feb 01/07

Artificial Feel Unlocking Solenoid 16CA


Figure 402/TASK 27-23-17-991-001



EFF :
ALL
 27-23-17



AIJ




Page 406
Nov 01/10

(d) Support the artificial feel unit (4).


(e) Remove the bush (10) from the lever arm (11).
(4) Disconnect the forked lever (17) of the artificial feel unit (4) from
the solenoid 16CA (3).
(a) Remove the screws (7) and the washers (8) from the cover (6).
(b) Remove the cover (6) from the artificial feel unit (4).
(c) Remove and discard the cotter pin (30).
(d) Remove the nut (29), the washer (28) and the bolt (15).
(5) Remove the solenoid 16CA (3) from the artificial feel unit (4).
(a) Support the solenoid (3).
(b) Remove the screws (22) and the washers (23).
(c) Move the eye-end (18) of the solenoid (3) away from the forked
lever (17) of the artificial feel unit (4).
(d) Remove the bush (16) from the forked lever (17).
(e) Remove the solenoid (3).
(6) Remove the eye-end (18) of the solenoid (3) from the screw spindle
(21).
CAUTION : BE CAREFUL WHEN YOU REMOVE THE PARTS THAT FOLLOW:
_______
- THE EYE END
- THE SHIM WASHER
- THE SECURING PLATE
- THE SCREW SPINDLE.
IF YOU TURN THE SHAFT DURING THE REMOVAL OF THESE PARTS,
DAMAGE TO THE SOLENOID CAN OCCUR.
(a) Straighten the tab of the securing plate (20) to release the
eye-end (18).
(b) Hold the screw spindle (21) and turn the eye-end (18) in the
counter-clockwise direction to release it.
(c) Remove and retain the eye-end (18).



EFF :
ALL
 27-23-17



AIJ




Page 407
Feb 01/07

(d) Remove and discard the shim washer (19) and the securing plate
(20).



EFF :
ALL
 27-23-17



AIJ




Page 408
Feb 01/07

TASK 27-23-17-400-001
Installation of the Artificial Feel Unlocking Solenoid 16CA
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R

98D27207547000
98D27207548000

warning notices
adjustable access platform 6.0 m (19 ft. 8 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-23-17



AIJ




Page 409
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-002
R
R

Material No. 11-026


Material No. 15-007

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------14
19
20
30

cotter pin
shim washer
securing plate
cotter pin

27-23-04
27-23-41
27-23-41
27-23-41

02
01
01
01

-080
-160
-150
-080

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-23-00-710-001
29-00-00-864-001
53-55-12-000-001
53-55-12-400-001
55-33-13-010-002
55-33-13-410-002
27-23-17-991-002

Operational Test of the Rudder Artificial-Feel Loads


with Tool (355M03200001)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Rudder Fairings 325AL and 325AR
Installation of the Rudder Fairings 325AL and 325AR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-23-17



AIJ




Page 410
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-23-17-991-001

Fig. 402

3. __________
Job Set-up
Subtask 27-23-17-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(7) Make sure that the adjustable access platform is in position.
(8) Make sure that the access door 312AR is open.
(9) Make sure that the access panel 325BL at the trailing edge of the
vertical stabilizer (1) is open (Ref. TASK 55-33-13-010-002).
(10) Make sure that the rudder fairing 325AL is removed (Ref. TASK 53-5512-000-001).
(11) Make sure that the PIN-RIGGING (98D27207547000) (51) is in the rudder
cable quadrant and the PIN-RIGGING (98D27207548000) (50) in the
bellcrank of the rudder control unit.



EFF :
ALL
 27-23-17


R 
AIJ




Page 411
Aug 01/11

Subtask 27-23-17-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 402/TASK 27-23-17-991-001)
Subtask 27-23-17-910-050
A. Preparation for Installation
(1) Clean the interface of the artificial feel unit (4) and the cover (6)
with CLEANING AGENTS (Material No. 11-026) and let it dry.

(2) Make sure that the structure of the vertical stabilizer (1), the
structure of the rudder (2) and the paintwork are clean and not
damaged.
(3) Make sure that the artificial feel unit (4), the universal joint (5)
and the lever arm (11) are clean and in a good condition.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Make sure that the screws (7),(22), the bolts (9),(15), the bushes
(10),(16),(32) and the nuts (13),(29) are clean and in a good
condition.
R

(6) Clean the cover (6) with CLEANING AGENTS (Material No. 11-026) and
let it dry.
(7) Apply COMMON GREASE (Material No. 04-004) to the thread of the screws
(7),(22) and the bolts (9),(15).
(8) Apply COMMON GREASE (Material No. 04-004) to the bushes (10),(16).



EFF :
ALL
 27-23-17



AIJ




Page 412
Aug 01/11

(9) Apply SPECIAL MATERIALS (Material No. 05-002) to the shaft of the
bolts (9),(15).
(10) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-002) to the
interface of the Artificial Feel Unit (4).
(11) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-002) to the
interface of the bracket (24) on the replacement solenoid 16CA (3).
Subtask 27-23-17-280-050
B. Do a test of the forked lever (17) of the artificial feel unit (4) for
free movement
(1) Put the artificial feel unit (4) in its installation position.
R
R

(2) Temporarily install the bolt (9), the bushes (10),(32), the washers
(12),(33) and the nut (13).
(3) Push down the forked lever (17) with your hand and hold it in its
lowest position.
(4) Release the forked lever (17):
- the forked lever (17) must come fully up with free movement.
NOTE : If the forked lever (17) does not come fully up with free
____
movement, then you must do the applicable Airbus Service
Bulletin (Ref. SB No. A320-27-1130).

R
R

(5) Remove the nut (13), the washers (12),(33), the bushes (10),(32) and
the bolt (9).
Subtask 27-23-17-420-050
C. Installation of the Artificial-Feel Unlocking-Solenoid 16CA
(1) Install the eye-end (18) on the screw spindle (21) of the solenoid
16CA (3) as follows:
CAUTION : BE CAREFUL WHEN YOU INSTALL THE PARTS THAT FOLLOW:
_______
- THE EYE END
- THE SHIM WASHER
- THE SECURING PLATE
- THE SCREW SPINDLE.
IF YOU TURN THE SHAFT DURING THE INSTALLATION OF THESE
PARTS, DAMAGE TO THE SOLENOID CAN OCCUR.



EFF :
ALL
 27-23-17



AIJ




Page 413
Nov 01/10

(a) Put a new securing plate (20) on the screw spindle (21).
(b) Put a new shim washer (19) on the screw spindle (21).
(c) Install the eye-end (18) on the screw spindle (21). Do not
tighten the eye-end (18).
(d) Turn the eye-end (18) in the clockwise direction until it touches
the shim washer (19).
(2) Install the solenoid 16CA (3) on the artificial feel unit (4).
(a) Put the interface of the bracket (24) in position at the
artificial feel unit (4).
(b) Support the solenoid (3) and install the screws (22) and the
washers (23).
(c) Do not fully tighten the screws (22) at this time.
(d) Align the bolt hole in the eye-end (18) with the bolt hole in the
forked lever (17).
(e) If the bolt holes do not align, you must decrease the shim washer
(19) or replace it as necessary.
(f) Adjust the eye-end (18) on the screw spindle (21) as necessary.
NOTE : Do not let the screw spindle (21) turn during the
____
installation of the solenoid (3).
(g) Do a check and make sure that the eye-end (18) is parallel to the
forked lever (17) and not twisted.
(h) Install the bush (16) in the forked lever (17) of the artificial
feel unit (4).
(i) Put the bolt (15) through the connection of the forked lever (17)
and the eye-end (18). Do not install the washer (28) and the nut
(29) at this time.
(j) Safety the eye-end (18) with the securing plate (20).
(k) Fully tighten the screws (22).
R

(l) Apply the STORAGE PRESERVATION (Material No. 15-007) at the heads
of the screws (22).



EFF :
ALL
 27-23-17



AIJ




Page 414
Nov 01/08

(3) Connect the forked lever (17) of the artificial feel unit (4) to the
solenoid 16CA (3) as follows:
(a) Install the washer (28) and the nut (29) on the bolt (15).
(b) Safety the nut (29) with a new cotter pin (30).
(c) Apply a thin layer of the SPECIAL MATERIALS (Material No. 05-002)
to the interface of the artificial feel unit (4) at the shaft
(31).
(4) Install the cover (6) on the artificial feel unit (4) as follows:
(a) Put the cover (6) over the shaft (31) in its correct position it
on the artificial feel unit (4).
(b) Install the screws (7) and the washers (8) in the cover (6).
(c) Apply the STORAGE PRESERVATION (Material No. 15-007) to the heads
of the screws (7).
(5) Connect the lever arm (11) to the artificial feel unit (4) as
follows:
(a) Install the bush (10) in the lever arm (11).
(b) Move the artificial feel unit (4) at the universal joint (5). Put
the shaft (31) in position at the lever arm (11).
(c) Support the artificial feel unit (4).
(d) Align the bolt hole in the lever arm (11) with the bolt hole in
the shaft (31).
R
R

(e) Install the bolt (9), the washers (12),(33), the bush (32) and
the nut (13).
(f) TORQUE the nut (13) to 0.8 m.daN (70.79 lbf.in).
(g) Safety the nut (13) with a new cotter pin (14).
(6) Remove the blanking caps and connect the electrical connector (26) to
the receptacle (25) of the solenoid 16CA (3).
(7) Make sure that the cable of the electrical connector (26) does not
rub on the spar box of the vertical stabilizer (1).



EFF :
ALL
 27-23-17



AIJ




Page 415
Nov 01/10

Subtask 27-23-17-080-050
D. Removal of the Rigging Pins
(Ref. Fig. 401/TASK 27-23-17-991-002)
R

(1) Remove the PIN-RIGGING (98D27207547000) (51) from the rudder cable
quadrant.

(2) Remove the PIN-RIGGING (98D27207548000) (50) from the bellcrank of


the rudder control unit.
Subtask 27-23-17-865-051
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-23-17-860-053
F. Preparation for the Test
(1) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch
and the OFF legend goes off.
(2) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch
and the OFF legend goes off.
Subtask 27-23-17-710-050
G. Do an operational test of the artificial feel loads of the rudder
(Ref. TASK 27-23-00-710-001).
5. Close-up
________
Subtask 27-23-17-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325BL at the trailing edge of the vertical
stabilizer (Ref. TASK 55-33-13-410-002).
(3) Install the rudder fairing 325AL (Ref. TASK 53-55-12-400-001).
(4) Close the access door 312AR.



EFF :
ALL
 27-23-17



AIJ




Page 416
Nov 01/10

(5) Remove the warning notice(s).


(6) Remove the access platform(s).



EFF :
ALL
 27-23-17


R 
AIJ




Page 417
Nov 01/08

ARTIFICIAL FEEL AND TRIM UNIT - REMOVAL/INSTALLATION


____________________________________________________
TASK 27-23-41-000-001
Removal of the Artificial Feel and Trim Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
6137-013
6137-060
98D27207547000
98D27207548000

1
1
1
1
1

blanking caps
circuit breaker(s) safety clip(s)
warning notices
ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
PIN-LOCKING
PIN - LOCKING
PIN-RIGGING
PIN-RIGGING



EFF :
ALL
 27-23-41



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-23-17-000-001
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
55-33-13-010-002
27-23-41-991-001
27-23-41-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Artificial Feel Unlocking Solenoid
16CA
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-23-41-861-050
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-23-41-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-23-41


R 
AIJ




Page 402
Aug 01/07

Subtask 27-23-41-869-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(4) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.
(5) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.
(6) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(7) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
Subtask 27-23-41-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-41-860-050
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).



EFF :
ALL
 27-23-41


R 
AIJ




Page 403
Aug 01/07

(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)


(3) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
Subtask 27-23-41-010-050
F. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access door 312AR.
(3) Open the access panels 325BR, 325BL (Ref. TASK 55-33-13-010-002).
Subtask 27-23-41-480-050
G. Installation of the Rigging Pins
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(Ref. Fig. 401/TASK 27-23-41-991-001, 402/TASK 27-23-41-991-002)
(1) Put the PIN-RIGGING (98D27207547000) (24) in the rudder cable
quadrant.
(2) Put the PIN-RIGGING (98D27207548000) (25) in the bellcrank of the
rudder control unit.
(3) Remove and discard the lockwire from the blanking plug (31).
(4) Remove the blanking plug (31) from the rigging hole of the rudder
trim actuator (4).
(5) For the rudder trim actuators with the part numbers 6137-4 or 6137-5:
- Install the PIN - LOCKING (6137-060) (30) in the rigging hole of
the rudder trim actuator (4).
(6) For the rudder trim actuators with the part number 6137-3:
- Install the PIN-LOCKING (6137-013) (30) in the rigging hole of the
rudder trim actuator (4).
(7) Install the blanking plug (31) in the storage hole of the rudder trim
actuator (4).



EFF :
ALL
 27-23-41



AIJ




Page 404
Feb 01/11

R
R

Artificial Feel and Trim Unit - Sheet 1


Figure 401/TASK 27-23-41-991-001



EFF :
ALL
 27-23-41



AIJ




Page 405
Feb 01/07

Artificial Feel and Trim Unit - Sheet 2


Figure 402/TASK 27-23-41-991-002



EFF :
ALL
 27-23-41



AIJ




Page 406
Nov 01/10

4. Procedure
_________
(Ref. Fig. 401/TASK 27-23-41-991-001, 402/TASK 27-23-41-991-002)
Subtask 27-23-41-020-050
A. Removal of the Artificial Feel and Trim Unit (1)
(1) Disconnect the electrical connector (13) from the solenoid 16CA (3).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Disconnect the artificial feel and trim unit (1) from the lever arm
(2) as follows:
(a) Remove and discard the cotter pin (12).

R
R

(b) Remove the nut (11), the washers (10) and (33), the bushes (7)
and (32) and the

(c) bolt (6). Move the eye-end (23) clear of the lever arm (2).
(4) Disconnect the artificial feel and trim unit (1) from the support
bracket (5) as follows:
(a) Remove and discard the cotter pins (20).
(b) Remove the nuts (19), the washers (18), the bushes (15) and the
bolts (14).
(5) Move the fork-end (22) clear of the lugs of the support bracket (5).
(6) Disconnect the universal joint (21) from the splined shaft (26) of
the rudder trim actuator (4).
(7) Remove the artificial feel and trim unit (1), between the frame and
the structure at the right side of the aircraft.
NOTE : Do not disconnect the universal joint (21) from the splined
____
shaft (35) of the artificial feel and trim unit (1) unless a
repair or a new installation is necessary.
NOTE : It may be necessary to:
____
- shorten the artificial feel and trim unit (1), and/or,
- remove two lower attachment bolts from the frame (one at
each side), to increase the clearance available.



EFF :
ALL
 27-23-41



AIJ




Page 407
Nov 01/10

(8) Disconnect the solenoid (3) from the artificial feel and trim unit
(1), if necessary (Ref. TASK 27-23-17-000-001).
(9) If necessary, disconnect the universal joint (21) from the splined
shaft (35) of the artificial feel and trim unit (1) as follows:
(a) Remove and discard the cotter pin (40).
(b) Remove the nut (39), the washer (38), the bolt (36) and the
saddle washer (37).
(c) Remove the universal joint (21) from the splined shaft (35).



EFF :
ALL
 27-23-41


R 
AIJ




Page 408
Nov 01/10

TASK 27-23-41-400-001
Installation of the Artificial Feel and Trim Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

R
R

No specific
No specific
No specific
6137-013
6137-060
98D27207547000
98D27207548000

1 ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE


1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-LOCKING
1 PIN - LOCKING
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-23-41



AIJ




Page 409
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-002

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-027


Material No. 08-029
R
Material No. 19-010

RUST INHIBITOR(FOR CORROSION USE 15-004)


(Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------12
20
40

cotter pin
cotter pin
cotter pin

27-23-04 02 -080
27-23-04 02 -080
27-23-04 02 -220

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-22-00-710-002
27-23-00-710-001
29-00-00-864-001
55-33-13-010-002
55-33-13-410-002

Operational Test of the Rudder Trim Actuation


Operational Test of the Rudder Artificial-Feel Loads
with Tool (355M03200001)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR



EFF :
ALL
 27-23-41



AIJ




Page 410
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-23-41-991-001
27-23-41-991-002

Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-23-41-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
R

(2) Make sure that the WARNING NOTICE(S) are in position.


(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 P/BSW on the overhead panel 23VU is
released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 P/BSW on the overhead panel 24VU is
released and the OFF legend is on.
(7) Make sure that the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE is in
position.
(8) Make sure that the access door 312AR is open.
(9) Make sure that the access panels 325BR, 325BL are open (Ref. TASK 5533-13-010-002).

(10) Make sure that the PIN-RIGGING (98D27207547000) (24) is installed in


the rudder cable quadrant.

(11) Make sure that the PIN-RIGGING (98D27207548000) (25) is installed in


the bellcrank of the rudder control unit.



EFF :
ALL
 27-23-41



AIJ




Page 411
Nov 01/10

R
R
R

(12) For the actuators with the part numbers 6137-4 or 6137-5, make sure
that:
- The PIN - LOCKING (6137-060) (30) is installed in the rudder trim
actuator.

(13) For the actuators with the part number 6137-3, make sure that:
- The PIN-LOCKING (6137-013) (30) is installed in the rudder trim
actuator.
Subtask 27-23-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-23-41-991-001)
Subtask 27-23-41-910-050
A. Preparation for the Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(Ref. Fig. 402/TASK 27-23-41-991-002)
(1) Make sure that the lever arm (2), the rudder trim actuator (4) and
the support bracket (5) are clean and show no damage.



EFF :
ALL
 27-23-41



AIJ




Page 412
Nov 01/07

R
R
R

(2) Make sure that the bolts (6),(14), the bushes


(7),(8),(9),(15),(16),(17),(32) and the nuts (11),(19), are clean and
show no damage.
(3) Make sure that the bushes (8),(9) are tight in the lever arm (2).
(4) Make sure that the bushes (16),(17) are tight in the lugs of the
support bracket (5).
NOTE : Safety the bushes (8),(9),(16),(17), if necessary, with
____
BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029).
(5) If removed, install the universal joint (21) as follows:
(a) Install the universal joint (21) on the splined shaft (35) of the
artificial feel and trim unit (1).
(b) Make sure that the holes in the universal joint (21) are aligned
with the holes in the splined shaft (35).
(c) Install the bolt (36), the saddle washer (37), the washer (38)
and the nut (39).
(d) Safety the nut (39) with a new cotter pin (40).
(6) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(6),(14).
(7) Apply COMMON GREASE (Material No. 04-004) to the sliding bushes
(7),(15).
(8) Apply SPECIAL MATERIALS (Material No. 05-002) to the shafts of the
bolts (6),(14).
Subtask 27-23-41-420-050
B. Installation of the Artificial Feel and Trim Unit
(1) Put the sliding bushes (15) in position in the flanged bushes (16) at
the support bracket (5).
(2) Put the artificial feel and trim unit (1) in position so that its
universal joint (21) engages in the splined shaft (26) of the rudder
trim actuator (4).
(3) Put the fork-end (22) in position on the lugs of the support bracket
(5).



EFF :
ALL
 27-23-41



AIJ




Page 413
Nov 01/10

(4) Hold the artificial feel and trim unit (1) in position.
(5) Connect the artificial feel and trim unit (1) to the support bracket
(5).
(a) Install the bolts (14) at the connections of the support bracket
(5) and the artificial feel and trim unit (1).
(b) Install the washers (18) and the nuts (19) on the bolts (14).
NOTE : Make sure that the bushes (15), (16) and (17) are
____
correctly installed.
(6) Connect the artificial feel and trim unit (1) to the lever arm (2).
(a) Put the sliding bush (7) in the flanged bush (8) at the lever arm
(2).
(b) Move the artificial feel and trim unit (1) so that the eye-end
(23) goes in the lever arm (2).
(c) Install the bolt (6) at the connection of the lever arm (2) and
the artificial feel and trim unit (1).
(d) If the bolt (6) does not align:
1
_

Remove the bolts (6), (14), the washers (18) and the nuts
(19).

2
_

Lift the artificial feel and trim unit (1) from the splined
shaft (26).

3
_

Turn the universal joint (21) until you can install the bolt
(6) freely at the connection of the artificial feel and trim
unit (1) and the lever arm (2), (when the artificial feel and
trim unit (1) is in the installation position).

4
_

Put the artificial feel and trim unit (1) back in the
installation position, so that the universal joint (21)
engages in the splined shaft (26) of the rudder trim actuator
(4).

5
_

Install the bolts (14) at the connections of the support


bracket (5) and the artificial feel and trim unit (1).

R
R
R



EFF :
ALL
 27-23-41



AIJ




Page 414
Aug 01/07

6
_

Install the washers (18) and the nuts (19) on the bolts (14).
NOTE : Make sure that the bushes (15), (16) and (17) are
____
correctly installed.

7
_

Install the bolt (6) at the connection of the lever arm (2)
and the artificial feel and trim unit (1).

(e) Install the washers (10), (33) and the nut (11) on the bolt (6).

R
R

NOTE : Make sure that the bushes (7), (8), (9) and (32) are
____
correctly installed.
(f) TORQUE the nuts (11) and (19) to 0.8 m.daN (70.79 lbf.in) and
then loosen the nuts, if necessary, to the subsequent cotter pin
hole.
(g) Safety the nuts (11) and (19) with the new cotter pin (12) and
the cotter pin (20).
NOTE : Install the two lower attachment bolts in the frame, if
____
removed.

(7) Remove the blanking caps from the electrical connector(s).


(8) Make sure that the electrical connectors are clean and in the correct
condition.
(9) Connect the electrical connector (13) to the solenoid (3).
NOTE : Make sure that the cable of the electrical connector (13) does
____
not rub on the spar box of the vertical stabilizer.
Subtask 27-23-41-080-050
C. Removal of the Rigging Pins
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

(1) Remove the PIN-RIGGING (98D27207547000) (24) from the rudder cable
quadrant.

(2) Remove the PIN-RIGGING (98D27207548000) (25) from the bellcrank of


the rudder control unit.



EFF :
ALL
 27-23-41



AIJ




Page 415
Nov 01/10

(3) For the actuators with the part numbers 6137-4 or 6137-5:
- Remove the PIN - LOCKING (6137-060) (30) from the rudder trim
actuator (4).
(4) For the actuators with the part number 6137-3:
- Remove the PIN-LOCKING (6137-013) (30) from the rudder trim
actuator (4).
(5) Remove the blanking plug (31) from the storage hole of the rudder
trim actuator (4).
(6) Make sure that the O-ring on the blanking plug (31) is installed and
in good condition.
(7) Install the blanking plug (31) in the rigging hole of the rudder trim
actuator (4).
(8) TORQUE the blanking plug (31) to 0.10 m.daN (8.84 lbf.in).
(9) Safety the blanking plug (31) with the lockwire MISCELLANEOUS
(Material No. 19-010).
Subtask 27-23-41-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC.
Subtask 27-23-41-860-052
E. Preparation for the Test
(1) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch
and the OFF legend goes off.
(2) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch
and the OFF legend goes off.
Subtask 27-23-41-710-050
F. Test
(1) Do an operational test of the artificial feel and trim unit
(Ref. TASK 27-23-00-710-001).
(2) Do an operational test of the rudder trim actuation (Ref. TASK 27-2200-710-002).



EFF :
ALL
 27-23-41


R 
AIJ




Page 416
Nov 01/10

5. Close-up
________
Subtask 27-23-41-860-053
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Apply a layer of SPECIAL MATERIALS (Material No. 05-027) to the
adjacent structure.
(3) Make sure that the drain holes in the adjacent structure are not
blocked.
(4) Remove the warning notice(s).
Subtask 27-23-41-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Close the access panels 325BR, 325BL (Ref. TASK 55-33-13-410-002).
(4) Remove the access platform(s).



EFF :
ALL
 27-23-41


R 
AIJ




Page 417
Nov 01/10

LIMITATION UNIT - RUDDER TRAVEL (4CC) - REMOVAL/INSTALLATION


____________________________________________________________
TASK 27-23-51-000-001
Removal of the Rudder Travel Limitation Unit 4CC
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27207545000
98D27207546000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 8M (26 FT) - ADJUSTABLE
3 PIN-RIGGING
1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-23-51



AIJ




Page 401
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-23-51-991-001

Fig. 401

3. __________
Job Set-up
Subtask 27-23-51-861-050
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-23-51-865-055
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-51-860-051
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(4) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.
(5) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.



EFF :
ALL
 27-23-51



AIJ




Page 402
Feb 01/07

(6) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).


Subtask 27-23-51-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-51-860-050
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
Subtask 27-23-51-010-050
F. Get Access
R

(1) Put the ACCESS PLATFORM 8M (26 FT) - ADJUSTABLE in position.


(2) Open the access panels 325DL, 325DR at the trailing edge of the
vertical stabilizer (1).
Subtask 27-23-51-480-050
G. Installation of the Rigging Pins
(Ref. Fig. 401/TASK 27-23-51-991-001)
(1) Put the PIN-RIGGING (98D27207545000) (32) in the bellcrank assembly
(4) for the travel limitation unit 4CC (5).



EFF :
ALL
 27-23-51



AIJ




Page 403
Feb 01/11

R
R

Rudder Travel Limitation Unit 4CC


Figure 401/TASK 27-23-51-991-001



EFF :
ALL
 27-23-51



AIJ




Page 404
Feb 01/07

R
R

(2) Put the PIN-RIGGING (98D27207545000) and the PIN-RIGGING


(98D27207545000) (32) through the levers (6),(16) of the travel
limitation unit 4CC (5).

(3) Put the PIN-RIGGING (98D27207546000) (33) in the bellcrank assembly


for the servo actuator 1025GM.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-23-51-991-001)
Subtask 27-23-51-020-050
A. Removal of the Rudder Travel Limitation Unit 4CC
(1) Remove the electrical connectors (17) as follows:
(a) Cut and remove the lockwire that safeties the electrical
connectors (17).
(b) Disconnect the electrical connectors (17) from the plugs on the
bottom of the travel limitation unit 4CC (5).

(c) Put blanking caps on the disconnected electrical connector(s).


(2) Disconnect the control rods (14) and (15) from the rudder travel
limitation unit (5) as follows:
(a) Remove and discard the cotter pins (13).
(b) Remove the nuts (12), the washers (11) and the bolts (7).
(c) Move the control rods (14),(15) clear of the levers (6),(16).
(d) Remove the bush (10) from the levers (6),(16).
NOTE : Do not remove the bushes (8),(9) from the levers (6),(16).
____
The bushes (8),(9) are safetied in the levers (6),(16)
with Loctite.
(3) Remove the bolt (30), the nut (31) and the bonding strap (18).
(4) Remove the rudder travel limitation unit (5) from the support bracket
(19) as follows:
(a) Release the tabwashers (22).



EFF :
ALL
 27-23-51



AIJ




Page 405
May 01/10

(b) Hold the rudder travel limitation unit (5) and remove the bolts
(21) with the tabwashers (22).
(c) Remove the rudder travel limitation unit (5) from the support
bracket (19).
(d) Discard the tabwashers (22).
(5) Remove the rudder travel limitation unit (5) from the bracket (20) as
follows:
(a) Remove the bolts (24) and the washers (23).
(b) Hold the rudder travel limitation unit (5) and remove the bracket
(20).
(c) Make sure that the levers (6) and (16) of the travel limitation
unit (5) are safetied with the pins (32), to protect the
component during the storage.



EFF :
ALL
 27-23-51



AIJ




Page 406
Feb 01/07

TASK 27-23-51-400-001
Installation of the Rudder Travel-Limitation Unit 4CC
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R

98D27207545000
98D27207546000

warning notices
adjustable access platform 8.0 m (26 ft. 3 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
3 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-23-51



AIJ




Page 407
May 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 08-029
Material No. 09-005
R
R

Material No. 11-026


Material No. 16-021
Material No. 19-018

USA ASTM D 5363


GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)
USA MIL-PRF-81733
INTERFAY SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS ST L OR NICKEL ALLOY
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------13

cotter pins

27-21-47 01A-210

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
22-61-00-710-001
24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
27-23-51-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the Rudder Travel Limiting
Function
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401



EFF :
ALL
 27-23-51



AIJ




Page 408
Aug 01/11

3. __________
Job Set-up
Subtask 27-23-51-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(3) Make sure that the warning notices are in position.
(4) Make sure that the rudder pedals are in the neutral position.
(5) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(6) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released.
(7) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released.
(8) Make sure that the adjustable access platform is in position.
(9) Make sure that the access panels 325DL, 325DR at the trailing edge of
the vertical stabilizer (1) are open.
R

(10) Make sure that the PIN-RIGGING (98D27207545000) (32) is installed in


the bellcrank assembly (4) for the travel limitation unit 4CC.

(11) Make sure that the PIN-RIGGING (98D27207546000) (33) is installed in


the bellcrank assembly for the servo actuator 1025GM.



EFF :
ALL
 27-23-51



AIJ




Page 409
May 01/10

Subtask 27-23-51-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-23-51-991-001)
Subtask 27-23-51-910-050
A. Preparation for Installation
R
R

(1) Clean the interface of the support bracket (19) with CLEANING AGENTS
(Material No. 11-026) and let it dry.
(2) Make sure that the bellcrank assy (4), the control rods (14),(15) and
the support bracket (19) are in the correct condition.
(3) Make sure that the bonding strap (18) is in the correct condition.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Make sure that the bolts (7),(21),(24),the bushes (8),(9),(10) and
the nuts (12) are clean and in a good condition.
Subtask 27-23-51-560-050
B. Preparation of the Replacement Component
(1) Make sure that the PIN-RIGGING (98D27207545000) and the PIN-RIGGING
(98D27207545000) (32) are installed in the levers (6) and (16) of the
replacement travel limitation unit (5).



EFF :
ALL
 27-23-51



AIJ




Page 410
Aug 01/11

(2) Apply SEALANTS (Material No. 09-005) to the component interface of


the rudder travel limitation unit (5), the bracket (20) and the
support bracket (19).
NOTE : Make sure that the bonding area of the bracket (20) stays
____
clean.
Subtask 27-23-51-420-050
C. Installation of the Rudder Travel-Limitation Unit 4CC
R
(1) Install the rudder travel-limitation unit (5) on the bracket (20) as
follows:
(a) Put the rudder travel-limitation unit (5) in position at the
bracket (20). Attach it with the bolts (24) and the washers (23).
(b) TORQUE the bolts (24) to 0.5 m.daN (44.24 lbf.in).
(c) Remove the SEALANTS (Material No. 09-005) that has come out at
the connection of the travel limitation unit (5) and the bracket
(20).
(2) Install the rudder travel-limitation unit (5) on the support bracket
(19) as follows:
(a) Put the rudder travel-limitation unit (5) with the bracket (20)
in position at the support bracket (19). Attach it with the bolts
(21) and the new tabwashers (22).
(b) TORQUE the bolts (21) to 0.5 m.daN (44.24 lbf.in).
(c) Safety the bolts (21) with the tabwashers (22).
(d) Remove the SEALANTS (Material No. 09-005) that has come out at
the connection of the bracket (20) and the support bracket (19).
(e) Install the bonding strap (18) with the bolt (30) and the nut
(31).
(f) Make sure that the bonding strap (18) is correctly installed
(Ref. TASK 20-28-00-912-004).



EFF :
ALL
 27-23-51



AIJ




Page 411
Nov 01/08

(3) Connect the control rods (14) and (15) to the travel-limitation unit
(5) as follows:
(a) Make sure that the bushes (8) and (9) are tight in the levers (6)
and (16).
(b) Apply the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029) to
the bushes (8) and (9) and safety them in the levers (6) and (16)
if necessary.
(c) Put the bush (10) into the bush (9) at the levers (6) and (16).
(d) Put the control rods (14) and (15) in position at the levers (6)
and (16).
(e) Install the bolts (7), the washers (11) and the nuts (12).
(f) Make sure that the bushes (8), (9) and (10) are correctly
installed in the levers (6) and (16).
(g) TORQUE the nuts (12) to 0.7 m.daN (61.94 lbf.in) and then loosen
the nuts (12), if necessary, to the next cotter pin hole.
(h) Safety the nuts (12) with the cotter pins (13).
(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Remove the blanking caps and connect the electrical connectors (17).
Do this on the bottom of the rudder travel limitation unit (5).
(6) Install the bonding leads (36) with the bolt (35) and the nut (34) if
removed (Ref. TASK 20-28-00-912-004). Do this on the electrical
connectors (17).
(7) Safety the electrical connectors (17) to the bonding leads (36) with
the lockwire MISCELLANEOUS (Material No. 19-018)
(8) Apply the STRUCTURE PAINTS (Material No. 16-021) to the connections
of the bonding leads (36) and the electical connectors (17).



EFF :
ALL
 27-23-51


R 
AIJ




Page 412
Nov 01/08

Subtask 27-23-51-080-050
D. Removal of the Rigging Pins
R

(1) Remove the PIN-RIGGING (98D27207545000) (32) from the bellcrank assy
(4).

(2) Remove the PIN-RIGGING (98D27207545000) (32) from the levers (6),(16)
of the travel limitation unit 4CC (5).

(3) Remove the PIN-RIGGING (98D27207546000) (33) from the bellcrank


assembly of the servo actuator 1025GM.
Subtask 27-23-51-865-051
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC
Subtask 27-23-51-860-055
F. Preparation for the Test
(1) Make sure that the travel range of the rudder (2), the rudder travel
limitation unit (5) is clear of tools and other items.
(2) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(3) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch
and the OFF legend goes off.
(4) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch
and the OFF legend goes off.
Subtask 27-23-51-710-050
G. Do the operational test of the rudder travel limiting function (Ref. TASK
22-61-00-710-001).



EFF :
ALL
 27-23-51



AIJ




Page 413
May 01/10

5. Close-up
________
Subtask 27-23-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Close the access panels 325DL, 325DR.
(4) Remove the access platform(s).



EFF :
ALL
 27-23-51


R 
AIJ




Page 414
Feb 01/07

TASK 27-23-51-000-002
Removal of the Electronic Module of the Rudder Travel Limitation Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27207545000

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 8M (26 FT)
3 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
27-23-51-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Fig. 402



EFF :
ALL
 27-23-51



AIJ




Page 415
Feb 01/11

3. __________
Job Set-up
Subtask 27-23-51-861-051
A. Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861-002)
Subtask 27-23-51-865-056
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-51-860-053
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(4) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.
(5) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.
(6) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-23-51


R 
AIJ




Page 416
Feb 01/07

Subtask 27-23-51-865-054
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-51-860-052
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
Subtask 27-23-51-010-051
F. Get Access
R

(1) Put the ACCESS PLATFORM 8M (26 FT) in position below zone 325.
(2) Open the access panels 325DL and 325CL or 325DR and 325CR at the
trailing edge of the vertical stabilizer.
Subtask 27-23-51-480-051
G. Installation of the Rigging Pins
(Ref. Fig. 402/TASK 27-23-51-991-002)
(1) Put a PIN-RIGGING (98D27207545000) (4) in the bellcrank assembly for
the travel limitation unit (1).
(2) Put a PIN-RIGGING (98D27207545000) and a PIN-RIGGING (98D27207545000)
(4) in each lever of the travel limitation unit (1).



EFF :
ALL
 27-23-51



AIJ




Page 417
Feb 01/11

R
R

Electronic Module
Figure 402/TASK 27-23-51-991-002



EFF :
ALL
 27-23-51



AIJ




Page 418
Feb 01/07

4. Procedure
_________
Subtask 27-23-51-020-051
A. Removal of the Electronic Module
(1) Cut and remove the lockwire which safeties the captive bolts (3).
(2) Loosen the captive bolts (3).
(3) Remove the electronic module (2) from the travel limitation unit (1).



EFF :
ALL
 27-23-51


R 
AIJ




Page 419
Feb 01/07

TASK 27-23-51-400-002
Installation of the Electronic Module of the Rudder Travel Limitation Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27207545000

warning notices
adjustable access platform 8.0 m (26 ft. 3 in.)
2 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
R
R

Material No. 11-026


Material No. 19-003

lockwire, corrosion-resistant steel, dia. 0.8 mm


(0.032 in.)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-23-51



AIJ




Page 420
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-61-00-710-001
24-41-00-861-002
24-41-00-862-002
29-00-00-864-001

Operational Test of the Rudder Travel Limiting


Function
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action

3. __________
Job Set-up
Subtask 27-23-51-860-056
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(3) Make sure that the warning notices are in position.
(4) Make sure that the rudder pedals are in the neutral position.
(5) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(6) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released.
(7) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released.
(8) Make sure that the adjustable access platform is in position.
(9) Make sure that the access panels 325DL, 325DR, 325CL, 325CR at the
trailing edge of the vertical stabilizer (1) are open.



EFF :
ALL
 27-23-51


R 
AIJ




Page 421
Feb 01/07

(10) Make sure that the PIN-RIGGING (98D27207545000) (4) is installed in


the bellcrank assembly (4) for the travel limitation unit (1).
(11) Make sure that the PIN-RIGGING (98D27207545000) (4) is installed in
each lever of the travel limitation unit (1).
Subtask 27-23-51-865-053
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-23-51-420-051
A. Installation of the Electronic Module
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) To install the same electronic module use a MISCELLANEOUS (Material
No. 19-003) and clean the contact surface with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Put the electronic module (2) in position on the travel limitation
unit (1).
(3) Tighten the captive bolts (3).
(4) Safety the captive bolts (3) with lockwire, corrosion-resistant
steel, dia. 0.8 mm (0.032 in.).



EFF :
ALL
 27-23-51



AIJ




Page 422
Aug 01/11

Subtask 27-23-51-080-051
B. Removal of the Rigging Pins
R

(1) Remove the PIN-RIGGING (98D27207545000) (4) from the levers of the
rudder travel limitation unit (1).

(2) Remove the PIN-RIGGING (98D27207545000) (4) from the bellcrank


assembly of the rudder travel limitation unit (1).
Subtask 27-23-51-865-057
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-23-51-860-057
D. Preparation for the Test
(1) Make sure that the travel range of the rudder (2), the rudder travel
limitation unit (5) is clear of tools and other items.
(2) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(3) On the overhead panel 23VU, push the FLT CTL/FAC 1 pushbutton switch
and make sure that the OFF legend goes off.
(4) On the overhead panel 24VU, push the FLT CTL/FAC 2 pushbutton switch
and make sure that the OFF legend goes off.
Subtask 27-23-51-710-051
E. Do an operational test of the travel limitation unit (Ref. TASK 22-61-00710-001).



EFF :
ALL
 27-23-51



AIJ




Page 423
May 01/10

5. Close-up
________
Subtask 27-23-51-010-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325DL and 325CL or 325DR and 325CR which you
opened before.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-23-51


R 
AIJ




Page 424
Feb 01/07

RUDDER HYDRAULIC ACTUATION - DESCRIPTION AND OPERATION


______________________________________________________
1. _______
General
Three fixed-body servocontrols with mechanical input are used to
hydraulically actuate the rudder.
Each servocontrol is powered by a different hydraulic system.
2. Component
__________________
Location
(Ref. Fig. 001)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------1025GM
SERVO CTL-RUDDER, G
325 325BL
27-24-51
2025GM
SERVO CTL-RUDDER, B
325 325DL
27-24-51
3025GM
SERVO CTL-RUDDER, Y
325 325CL
27-24-51



EFF :
ALL
 27-24-00



AIJ




Page 1
Feb 01/07

Location of Rudder Servocontrols


Figure 001


EFF :
ALL
 27-24-00



AIJ




Page 2
Feb 01/07

3. _____________________________
Hydraulic Supply (Ref. 27-00)
4. _____________________
Component Description
A. Rudder Servocontrol
(Ref. Fig. 002)
(1) General
The three servocontrols are interchangeable.
5. Operation
_________
A. Normal operation with the servocontrol pressurized
The moving piston rod of the servocontrol is slaved to the mechanical
input signal via the input lever (10). This lever is hinged in the middle
on the rotary input lever (11). It is connected at one end to the input
rod and at the other end to the feedback rod (12).
The rotary lever (11) actuates the control valve (8) and the stops (1)
limit its travel.
In the event of overpressure in one of the chambers, the chamber
overpressure is applied against one of the two pistons (2) and/or (3).
It sets the damping and pressure-relief valve (5) to the bypass position.
Then the chambers are isolated from the control valve and connected via
the damping hole (6).
The high pressure is connected to the return via the heating orifice (9).
This ensures permanent heating leakage.
The vent hole (13) serves to vent over or under pressure of air occurring
in the internal chamber of the cylinder assy.
B. Operation on the ground with the servocontrol depressurized
When the servocontrol is depressurized, the spring (4) sets the damping
and pressure-relief valve to the bypass position.
If the rudder is subjected to external forces, the pressure increases in
one of the two chambers. This causes the movement of the servocontrol
piston.
The fluid goes from one chamber to the other via the damping orifice and
provides a ground gust-damping function for gust speeds up to 80 Kts.
Two anti-cavitation valves permit the suction of the necessary volume of
hydraulic fluid to compensate for the thermal retraction on ground, in
the damping mode.



EFF :
ALL
 27-24-00



AIJ




Page 3
Feb 01/07

Rudder Servocontrol
Figure 002


EFF :
ALL
 27-24-00



AIJ




Page 4
Feb 01/07

C. Maintenance, rigging facilities, periodic tests


The maintenance is On condition.
The items given below are Line-Replaceable Unit :
- Filter
- Actuator eye-end.
To replace the servocontrol, it is necessary to have simultaneously the
surface and the servocontrol in the neutral position.
To this end, the adjustment of the servocontrol is obtained through the
adjustment of the spring rod length.
6. Test
____
A. A single operational periodic test is performed on the three hydraulic
systems (through the use of leakage measurement valves).
Its purpose is to make sure that there is no valve jamming and no
mechanical disconnection.



EFF :
ALL
 27-24-00



AIJ




Page 5
Feb 01/07

RUDDER HYDRAULIC ACTUATION - ADJUSTMENT/TEST


____________________________________________
R

TASK 27-24-00-710-001
Operational Test of the Rudder Hydraulic Actuation
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU



EFF :
ALL
 27-24-00



AIJ




Page 501
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Pressurize the Yellow Hydraulic System with the


Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-24-00-860-055
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows O.
(4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(5) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
4. Procedure
_________
Subtask 27-24-00-710-050
A. Do this test:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the CAPT or F/O side:
- push the right rudder pedal
until it touches the mechanical
stop.

The rudder moves to the right.


On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly to the right mark.



EFF :
ALL
 27-24-00



AIJ




Page 502
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------2. Slowly release the right rudder
The rudder moves from the right to the
pedal and then push the left
left.
rudder pedal until it touches the
On the lower ECAM display unit, on the
mechanical stop.
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves smoothly from the right mark to
the left mark smoothly.
3. Slowly release the left rudder
pedal.

The rudder moves to the neutral


position.
On the lower ECAM display unit, on the
F/CTL page:
- the RUD/G, B, Y symbols are green,
- the pointer of the RUD indicator
moves to the neutral position.

5. Close-up
________
Subtask 27-24-00-860-056
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-24-00


R 
AIJ




Page 503
Feb 01/07

TASK 27-24-00-710-002
Operational Test of the Rudder Servocontrols with Individual Hydraulic System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
R
1. __________________
Reason for the Job
Refer to the MPD TASK: 272400-01
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-24-00



AIJ




Page 504
Nov 01/10

3. __________
Job Set-up
Subtask 27-24-00-860-057
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows O.
(4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(5) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
(6) On the HYD section of the maintenance panel 50VU, make sure that:
- the HYD/LEAK MEASUREMENT VALVES/B, HYD/LEAK MEASUREMENT VALVES/G,
HYD/LEAK MEASUREMENT VALVES/Y pushbutton switches are pushed (the
OFF legends of these pushbutton switches are off).
(7) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).
(8) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the FAULT and
OFF legends are off).



EFF :
ALL
 27-24-00


R 
AIJ




Page 505
Feb 01/07

4. Procedure
_________
Subtask 27-24-00-710-051
A. Do this test:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the maintenance panel 50VU:
On the maintenance panel 50VU:
- release the HYD/LEAK MEASUREMENT - the OFF legends of the HYD/LEAK
VALVES/G and HYD/LEAK
MEASUREMENT VALVES/G and HYD/LEAK
MEASUREMENT VALVES/Y pushbutton
MEASUREMENT VALVES/Y pushbutton
switches.
switches come on.
2. On the CAPT or F/O side:
- slowly push the right rudder
pedal until it touches the
mechanical stop.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the right mark.
The rudder moves smoothly to the right.

3. Slowly release the right rudder


pedal and then push the left
rudder pedal until it touches the
mechanical stop.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly from the right mark to
the left mark.
The rudder moves smoothly from the
right to the left.

4. Slowly release the left rudder


pedal.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the neutral
position.
The rudder moves smoothly to the
neutral position.

5. On the maintenance panel 50VU:


On the maintenance panel 50VU:
- push the HYD/LEAK MEASUREMENT
- the OFF legend of the HYD/LEAK
VALVES/G pushbutton switch.
MEASUREMENT VALVES/G pushbutton
- release the HYD/LEAK MEASUREMENT
switch goes off,



EFF :
ALL
 27-24-00



AIJ




Page 506
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------VALVES/B pushbutton switch.
- the OFF legend of the HYD/LEAK
MEASUREMENT VALVES/B pushbutton
switch comes on.
6. On the CAPT or F/O side:
- slowly push the right rudder
pedal until it touches the
mechanical stop.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the right mark.
The rudder moves smoothly to the right.

7. Slowly release the right rudder


pedal and push the left pedal
until it touches the mechanical
stop.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly from the right mark to
the left mark.
The rudder moves smoothly from the
right to the left.

8. Slowly release the left rudder


pedal.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the neutral
position.
The rudder moves smoothly to the
neutral position.

9. On the maintenance panel 50VU:


On the maintenance panel 50VU:
- push the HYD/LEAK MEASUREMENT
- the OFF legend of the HYD/LEAK
VALVES/Y pushbutton switch.
MEASUREMENT VALVES/Y pushbutton
- release the HYD/LEAK MEASUREMENT
switch goes off,
VALVES/G pushbutton switch.
- the OFF legend of the HYD/LEAK
MEASUREMENT VALVES/G pushbutton
switch comes on.
10. On the CAPT or F/O side:
- slowly push the right rudder
pedal until it touches the
mechanical stop.

On the lower ECAM display unit, on the


F/CTL page:
- the pointer of the RUD indicator
moves smoothly to the right mark.
The rudder moves smoothly to the right.



EFF :
ALL
 27-24-00


R 
AIJ




Page 507
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------11. Slowly release the right rudder
On the lower ECAM display unit, on the
pedal and then push the left
F/CTL page:
rudder pedal until it touches the - the pointer of the RUD indicator
mechanical stop.
moves smoothly from the right mark to
the left mark.
The rudder moves smoothly from the
right to the left.
12. Slowly release the left rudder
pedal.

On the lower ECAM display unit, on the


F/CTL page :
- the pointer of the RUD indicator
moves smoothly to the neutral
position.
The rudder moves smoothly to the
neutral position.

5. Close-up
________
Subtask 27-24-00-860-058
A. Put the aircraft back to its initial configuration.
(1) On the maintenance panel 50VU:
- push the HYD/LEAK MEASUREMENT VALVES/G and HYD/LEAK MEASUREMENT
VALVES/B pushbutton switches (on these pushbutton switches, the OFF
legends go off).
(2) Depressurize the hydraulic systems (Ref. TASK 29-10-00-864-003)
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-24-00


R 
AIJ




Page 508
Feb 01/11

TASK 27-24-00-820-001
Adjustment of the Rudder Neutral Position
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
CAUTION : DO THIS PROCEDURE IN A HANGAR IF THERE ARE WIND GUSTS. WIND GUSTS CAN
_______
CAUSE DAMAGE TO THE LINKAGE WHEN THE RIGGING PINS ARE IN POSITION ON
THE RUDDER CONTROL.
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
98D27203001000
98D27207516000
98D27207546000
98D27303000001

warning notices
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
TOOL-RUDDER NEUTRAL ADJUSTMENT
TBD
PIN-RIGGING
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER

1
1
1
1
1
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire - corrosion resistant steel dia. 0.8 mm


(0.03 in.)



EFF :
ALL
 27-24-00



AIJ




Page 509
May 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------11-00-00-960-001
24-41-00-861-002
24-41-00-862-002
27-24-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
55-33-13-010-001
55-33-13-410-001
27-24-00-991-003
27-24-00-991-004
27-24-00-991-005

Replacement of the Tail Cone Reference Triangle


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Rudder Hydraulic Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
Fig. 501
Fig. 502
Fig. 503

3. __________
Job Set-up
Subtask 27-24-00-861-054
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-24-00-010-055
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822.



EFF :
ALL
 27-24-00



AIJ




Page 510
Feb 01/11

(3) At the battery power center 105VU:


- loosen the two screws and remove the protective cover.
Subtask 27-24-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-24-00-860-059
D. Aircraft Maintenance Configuration
(1) Pressurize the aircraft hydraulic systems (Ref. TASK 29-24-00-863001) (Ref. TASK 29-23-00-863-001) (Ref. TASK 29-10-00-863-003).
(2) On the overhead panel 23VU, make sure that:
- the FLT CTL/FAC1, FLT CTL/ELAC1 and FLT CTL/SEC1 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(3) On the overhead panel 24VU, make sure that:
- the FLT CTL/FAC2, FLT CTL/ELAC2, FLT CTL/SEC2 and FLT CTL/SEC3
pushbutton switches are pushed (on these pushbutton switches, the
FAULT and OFF legends are off).
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
(5) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.



EFF :
ALL
 27-24-00


R 
AIJ




Page 511
Feb 01/11

(6) Depressurize the aircraft hydraulic systems


(Ref. TASK 29-10-00-864-003) (Ref. TASK 29-23-00-864-001) (Ref. TASK
29-24-00-864-001).
Subtask 27-24-00-010-054
E. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at zone


325.
(2) Open the access panels 325CL, 325CR, 325DL (Ref. TASK 55-33-13-010001).
Subtask 27-24-00-860-053
F. Aircraft Maintenance Configuration
(1) Install the PIN-RIGGING (98D27207546000) (7) or TBD (98D27207516000)
on the output bellcrank of the lower servocontrol (4).
(2) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) on the trailing edge of the rudder.
(3) Pressurize the aircraft hydraulic systems (Ref. TASK 29-24-00-863001) (Ref. TASK 29-23-00-863-001) (Ref. TASK 29-10-00-863-003).
4. Procedure
_________
(Ref. Fig. 501/TASK 27-24-00-991-003)
Subtask 27-24-00-420-050
A. Installation of the Reference Triangle for the Rudder Neutral Position
(Ref. Fig. 502/TASK 27-24-00-991-004)
NOTE : Do this installation only if the reference triangle on the tail
____
cone is not in position.
NOTE : If the initial adjustment of two servocontrols at least is not
____
changed, you can find the rudder neutral position without a tool.
If two or three servocontrols are not adjusted correctly, you must
use the TOOL-RUDDER NEUTRAL ADJUSTMENT (98D27203001000) to find
the rudder neutral position.



EFF :
ALL
 27-24-00



AIJ




Page 512
May 01/11

R
R

Rudder Control
Figure 501/TASK 27-24-00-991-003



EFF :
ALL
 27-24-00



AIJ




Page 513
Feb 01/07

R
R

Reference Triangle for the Rudder Neutral Position


Figure 502/TASK 27-24-00-991-004



EFF :
ALL
 27-24-00



AIJ




Page 514
Feb 01/07

(1) Find the rudder neutral position with two servocontrols adjusted
correctly.
(a) Pressurize one of the two servocontrols adjusted correctly.
1
_

On the maintenance panel 50VU:


Make sure that the HYD/LEAK MEASUREMENT VALVES/ applicable
pushbutton switch is pushed (on this pushbutton switch the OFF
legend is off):
- for the lower servocontrol (4): G pushbutton switch
- for the middle servocontrol (3): Y pushbutton switch
- for the upper servocontrol (2): B pushbutton switch.

2
_

Release the two other HYD/LEAK MEASUREMENT VALVE pushbutton


switches (on these pushbutton switches the OFF legends come
on).

(b) Make a mark on the tail cone structure to show the position of
the rudder lower trailing edge.
(c) Pressurize the other servocontrol adjusted correctly and
depressurize the first one:
1
_

On the maintenance panel 50VU:


Push the HYD/LEAK MEASUREMENT VALVES/ applicable pushbutton
switch (on this pushbutton switch the OFF legend goes off):
- for the lower servocontrol (4): G pushbutton switch
- for the middle servocontrol (3): Y pushbutton switch
- for the upper servocontrol (2): B pushbutton switch.

2
_

Release the other HYD/LEAK MEASUREMENT VALVE pushbutton switch


(on this pushbutton switch the OFF legend comes on).

(d) Make sure that the rudder neutral position for this servocontrol
is the same as the rudder neutral position for the other
servocontrol. The rudder lower trailing-edge must be in line with
the mark on the tail cone.
NOTE : If the rudder neutral position is the same for the two
____
servocontrols, it is not necessary to use the TOOL-RUDDER
NEUTRAL ADJUSTMENT (98D27203001000).
If the rudder neutral position is not the same for the two
servocontrols, you must use the TOOL-RUDDER NEUTRAL
ADJUSTMENT (98D27203001000).

R
R
R
R



EFF :
ALL
 27-24-00



AIJ




Page 515
Nov 01/10

(2) Find the rudder neutral position with the TOOL-RUDDER NEUTRAL
ADJUSTMENT (98D27203001000):
(Ref. Fig. 503/TASK 27-24-00-991-005)
(a) Depressurize the aircraft hydraulic systems (Ref. TASK 29-10-00864-003) (Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864001).
(b) Put the warning notices to tell persons not to pressurize the
aircraft hydraulic systems:
- on the overhead panel 40VU
- on the ground service panels 197CB, 198CB, 197EB.
R
R

(c) On the LH side of the rudder, put the TOOL-RUDDER NEUTRAL


ADJUSTMENT (98D27203001000) in position.
(d) Use the tool to make the reference mark on the tail cone. If
necessary, remove all the other marks on the tail cone.
(3) Install the new reference triangle (8) on the tail cone, put its
center on the mark (Ref. TASK 11-00-00-960-001).
(Ref. Fig. 502/TASK 27-24-00-991-004)
(4) Remove the TOOL-RUDDER NEUTRAL ADJUSTMENT (98D27203001000) (if
applicable).
(5) If necessary, remove the warning notices which tell persons not to
pressurize the aircraft hydraulic systems.
(6) If necessary, pressurize the aircraft hydraulic systems (Ref. TASK
29-24-00-863-001) (Ref. TASK 29-23-00-863-001).
Subtask 27-24-00-820-050
B. Adjustment of the Rudder Neutral Position with the reference triangle
(8).
(1) On the maintenance panel 50VU:
(a) Release the HYD/LEAK MEASUREMENT VALVES/B and HYD/LEAK
MEASUREMENT VALVES/Y pushbutton switches (on these pushbutton
swithes, the OFF legends come on).
(b) Make sure that the HYD/LEAK MEASUREMENT VALVES/G pushbutton
switch is pushed (on this pushbutton switch the OFF legend is
off).



EFF :
ALL
 27-24-00



AIJ




Page 516
May 01/11

R
R

Installation of the Tool


Figure 503/TASK 27-24-00-991-005



EFF :
ALL
 27-24-00



AIJ




Page 517
Feb 01/07

(2) On the tail cone structure, make sure that the rudder lower
trailing-edge is in line with the center of gravity of the reference
triangle (8) or in the limits.
(Ref. Fig. 502/TASK 27-24-00-991-004)
If not, do these operations:

(a) Cut and remove the lockwire from the nuts of the spring rod (5).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the spring rod (5).
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with lockwire - corrosion resistant steel dia.
0.8 mm (0.03 in.).
(3) On the maintenance panel 50VU:
(a) Push the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (on this
pushbutton switch the OFF legend goes off).
(b) Release the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch (on
this pushbutton switch the OFF legend comes on).
(4) On the tail cone structure make sure that the rudder lower
trailing-edge is in line with the center of gravity of the reference
triangle (8) or in the limits.
(Ref. Fig. 502/TASK 27-24-00-991-004)
If not, do these operations:

(a) Cut and remove the lockwire from the nuts of the spring rod (6).
(b) Loosen the nuts.
(c) Release the lockwashers.



EFF :
ALL
 27-24-00



AIJ




Page 518
Feb 01/07

(d) Adjust the length of the spring rod (6).


NOTE : To adjust the clearance, turn the spring rod (6) in the
____
same direction as the spring rod (5).
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have
tightenend the nuts.
(h) Safety the nuts with lockwire - corrosion resistant steel dia.
0.8 mm (0.03 in.).
(5) On the maintenance panel 50VU:
(a) Push the HYD/LEAK MEASUREMENT VALVES/B pushbutton switch (on this
pushbutton switch the OFF legend goes off).
(b) Release the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (on
this pushbutton switch the OFF legend comes on).
(6) On the tail cone structure make sure that the rudder lower
trailing-edge is in line with the center of gravity of the reference
triangle (8) or in the limits.
(Ref. Fig. 502/TASK 27-24-00-991-004)
If not, do these operations:

(a) Cut and remove the lockwire from the nuts of the spring rod (1).
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the spring rod (1).
NOTE : To adjust the clearance, turn the spring rod (1) in the
____
same direction as the spring rod (6).
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.



EFF :
ALL
 27-24-00



AIJ




Page 519
Feb 01/07

(h) Safety the nuts with lockwire - corrosion resistant steel dia.
0.8 mm (0.03 in.).
(7) On the maintenance panel 50VU:
- push the HYD/LEAK MEASUREMENT VALVES/Y and HYD/LEAK MEASUREMENT
VALVES/G pushbutton switches (on these pushbutton switches, the OFF
legends go off).
(8) On the tail cone structure make sure that the rudder lower
trailing-edge is in line with the center of gravity of the reference
triangle (8) or in the limits.
(Ref. Fig. 502/TASK 27-24-00-991-004)
If not, do the adjustment of the spring rods (1), (6) and (5) of the
three servocontrols (2), (3) and (4).
5. Close-up
________
Subtask 27-24-00-860-054
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-10-00-864003) (Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001).
R
R

(2) Remove the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,


RUDDER (98D27303000001) from the trailing edge of the rudder.

(3) Remove the PIN-RIGGING (98D27207546000) (7) or TBD (98D27207516000)


from the output bellcrank of the lower servocontrol (4).
(Ref. Fig. 501/TASK 27-24-00-991-003)
Subtask 27-24-00-410-053
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325CL, 325CR, 325DL (Ref. TASK 55-33-13-410001).
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822.



EFF :
ALL
 27-24-00



AIJ




Page 520
Nov 01/10

(6) Remove the access platform(s).


(7) Remove the warning notice(s).
Subtask 27-24-00-710-052
C. Do the operational test of the rudder mechanical control (Ref. TASK 2724-00-710-001).
Subtask 27-24-00-862-053
D. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-24-00


R 
AIJ




Page 521
Feb 01/07

RUDDER HYDRAULIC ACTUATION - INSPECTION/CHECK


_____________________________________________
TASK 27-24-00-200-001
Check of the Rudder Servo Controls and Hinge Bearings for too much Play and
Condition
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272400-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

warning notice(s)
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-24-00-200-002
27-24-51-000-001
27-24-51-200-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Rudder Trailing Edge Play
Removal of the Rudder Servo Control
1025GM/2025GM/3025GM
Check of the Rudder Servo Control Attachments



EFF :
ALL
 27-24-00



AIJ




Page 601
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-51-400-001
27-24-51-960-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
55-36-41-000-001
55-36-41-400-001
55-46-00-200-001
55-46-11-000-001
55-46-11-400-001
TSM 27-20-00-810-802

Installation of the Rudder Servo Control


1025GM/2025GM/3025GM
Replacement of the Rudder Servo-Control Bearings
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the Hinge Arm Fittings No. 1 thru No. 7
Installation of the Hinge Arm Fittings No. 1 thru No.
7
Inspection of the Rudder Hinge Bearings 1 thru 7 for
Axial or Radial Movement
Removal of Rudder Hinge Bearing No. 6
Installation of Rudder Hinge Bearing No.6
Airframe Vibration due to the Rudder

3. __________
Job Set-up
Subtask 27-24-00-861-053
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-24-00-010-052
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at zone 325.
(2) Open the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR,
325EL, 325ER.



EFF :
ALL
 27-24-00



AIJ




Page 602
Feb 01/11

Subtask 27-24-00-860-050
C. Aircraft maintenance configuration
(1) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(2) On the HYD section of the maintenance panel 50VU :
- release the LEAK MEASUREMENT VALVES/B and LEAK MEASUREMENT VALVES/Y
pushbutton switches (the OFF legends of these pushbutton switches
come on).
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
Subtask 27-24-00-941-050
D. Safety Precautions
(1) Put warning notice(s) on the pedals (CAPT and F/O) to tell persons
not to operate them.
(2) Put warning notice(s) on the panel 110VU to tell persons not to use
the rudder trim.
4. Procedure
_________
Subtask 27-24-00-210-050
A. Check of the Rudder Servo Controls and Hinge Bearings for General
Condition
(1) Make sure that the rods and bellcranks are in the correct condition.
(2) Make sure that the liner is in the correct position between the
attachment hardware of the bearings (no migration of the liner).
NOTE : The liner is a coat of teflon between the bearing case and the
____
ball. It lets the ball turn with a minimum of friction (self
lubricating).
If you can see the liner, replace the related servo control
(Ref. TASK 27-24-51-000-001) (Ref. TASK 27-24-51-400-001) or hinge
arm end fitting (1 to 5 or 7) (Ref. TASK 55-36-41-000-001) (Ref. TASK
55-36-41-400-001) or hinge bearing No. 6 (Ref. TASK 55-46-11-000-001)
(Ref. TASK 55-46-11-400-001).



EFF :
ALL
 27-24-00


R 
AIJ




Page 603
Feb 01/07

Subtask 27-24-00-220-050
B. Check of the Rudder Trailing Edge Play
NOTE : For monitoring and follow up of the play at the rudder trailing
____
edge, it is recommended that the operator record in its own
documentation the values measured.
R
R
R
R
R
R
R

NOTE : The maximum play of 16 mm (0.6299 in.) prevents metal-to-metal


____
contact in the self-lubrification bearing but does not always
prevent rudder vibration.
If there is rudder vibration when the play is less than 16 mm
(0.6299 in.), refer to the procedure for Airframe Vibration (Ref.
TSM TASK 27-20-00-810-802).
(1) Do a check of the rudder trailing edge play (Ref. TASK 27-24-00-200002).
(2) For each servo control (Green, Yellow or Blue hydraulic system
pressurized), if the distance is more than 16 mm (0.6299 in.):
(a) Replace the related rudder servo control (Ref. TASK 27-24-51-000001) (Ref. TASK 27-24-51-400-001) or replace both rudder
servo-control bearings (Ref. TASK 27-24-51-960-001).
(b) Do a check of the rudder trailing edge play (Ref. TASK 27-24-00200-002).
(c) For each servo control (Green, Yellow or Blue hydraulic system
pressurized), if the distance stays more than 16 mm (0.6299 in.),
do a check of the related servo control fitting (Ref. TASK 27-2451-200-001).
(d) Do a check of the rudder trailing edge play (Ref. TASK 27-24-00200-002).
(e) For each servo control (Green, Yellow or Blue hydraulic system
pressurized), if the distance stays more than 16 mm (0.6299 in.),
do a check of the related rudder fitting (Ref. TASK 55-46-00-200001).
NOTE : This 16 mm (0.6299 in.) value includes 8 mm (0.3149 in.)
____
of surface bending as the result of the 30 daN (67.4426
lbf) force.



EFF :
ALL
 27-24-00



AIJ




Page 604
Aug 01/07

5. Close-up
________
Subtask 27-24-00-942-052
A. Put the aircraft back to its initial configuration
(1) On the HYD section of the maintenance panel 50VU :
- push the LEAK MEASUREMENT VALVES/G and LEAK MEASUREMENT VALVES/Y
pushbutton switches (the OFF legends of these pushbutton switches
go off).
(2) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) Remove the warning notice(s).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-24-00-410-050
B. Close Access
(1) Close the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR,
325EL, 325ER.
(2) Remove the access platform(s).
Subtask 27-24-00-862-052
C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-24-00


R 
AIJ




Page 605
Feb 01/07

TASK 27-24-00-200-002
Check of the Rudder Trailing Edge Play
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No specific
No specific
97A27003000007
98D27207516000
98D27207546000
98D27303000001
98D27303003001
98D27303022000

1
1
1
1
1
1
1

warning notice(s)
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
GAGE,ASSY-PUSH-PULL
TBD
PIN-RIGGING
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER



EFF :
ALL
 27-24-00



AIJ




Page 606
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

R
R

29-24-00-864-001
27-24-00-991-001
27-24-00-991-010
27-24-00-991-012
27-24-00-991-014
27-24-00-991-015

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 601
Fig. 602
Fig. 603
Fig. 604
Fig. 605

3. __________
Job Set-up
Subtask 27-24-00-861-056
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-24-00-010-059
B. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at zone 325.
(2) Open the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR,
325EL, 325ER.



EFF :
ALL
 27-24-00



AIJ




Page 607
May 01/11

Subtask 27-24-00-860-065
C. Aircraft maintenance configuration
(1) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(2) On the HYD section of the maintenance panel 50VU :
- release the LEAK MEASUREMENT VALVES/B and LEAK MEASUREMENT VALVES/Y
pushbutton switches (the OFF legends of these pushbutton switches
come on).
(3) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.
Subtask 27-24-00-941-054
D. Safety Precautions
(1) Put warning notice(s) on the pedals (CAPT and F/O) to tell persons
not to operate them.
(2) Put warning notice(s) on the panel 110VU to tell persons not to use
the rudder trim.
Subtask 27-24-00-480-054
E. Installation of the Tools
(Ref. Fig. 601/TASK 27-24-00-991-001, 602/TASK 27-24-00-991-010)
R

(1) Install the PIN-RIGGING (98D27207546000) (2) or TBD (98D27207516000)


pin (98D27207516090) on the input lever of the lower servocontrol
(1).
(2) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001) as follows:
- on the trailing edge of the rudder
- in line with the middle servo control.
(3) Install the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) on the trailing edge of the rudder.

R
R

NOTE : Clean and make the tail-cone upper surface moist before you
____
attach the tool.



EFF :
ALL
 27-24-00



AIJ




Page 608
Feb 01/11

R
R

Servocontrol - Location of Rigging Point


Figure 601/TASK 27-24-00-991-001



EFF :
ALL
 27-24-00



AIJ




Page 609
Feb 01/07

R
R

Installation of the Check Tool


Figure 602/TASK 27-24-00-991-010



EFF :
ALL
 27-24-00



AIJ




Page 610
Feb 01/07

NOTE : With the CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER


____
(98D27303022000), you can use the auto-record function. For
more information about the auto-record function, refer to the
manufacturers instruction manual.
(Ref. Fig. 603/TASK 27-24-00-991-012)
4. Procedure
_________
R

(Ref. Fig. 604/TASK 27-24-00-991-014, 605/TASK 27-24-00-991-015)


Subtask 27-24-00-220-054
A. Check for too much Play (Green servo control pressurized)
NOTE : For monitoring and follow up of the play at the rudder trailing
____
edge, it is recommended that the operator record in its own
documentation the values measured.
(1) On the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001), connect the GAGE ASSY - PUSH-PULL TOLL GAGE,ASSYPUSH-PULL (97A27003000007) (or equivalent).

R
R

(2) Apply a stable load of 30 daN (67.4426 lbf) in the right direction on
the trailing edge.

(3) Keep this load applied and set the dial gage to zero.

(4) Release the load.

R
R

(5) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the left direction on the trailing edge.

(6) Keep this load applied and record the value shown on the dial gage.

R
R

NOTE : This value includes 8 mm (0.3149 in.) of surface bending with


____
30 daN (67.4426 lbf) load applied.

R
R

(7) Release the load.



EFF :
ALL
 27-24-00



AIJ




Page 611
May 01/11

R
R

CHECK TOOL (DIGITAL) 98D27303022000 (Auto-recording Function)


Figure 603/TASK 27-24-00-991-012



EFF :
ALL
 27-24-00



AIJ




Page 612
Feb 01/07

R
R

Rudder Trailing Edge Play - Check List


Figure 604/TASK 27-24-00-991-014



EFF :
ALL
 27-24-00



AIJ




Page 613
May 01/11

R
R

Rudder Trailing Edge Play - Measurement


Figure 605/TASK 27-24-00-991-015



EFF :
ALL
 27-24-00



AIJ




Page 614
May 01/11

Subtask 27-24-00-869-059
B. On the HYD section of the maintenance panel 50VU:
(1) Release the LEAK MEASUREMENT VALVES/G pushbutton switch (the OFF
legend comes on).
(2) Push the LEAK MEASUREMENT VALVES/Y pushbutton switch (the OFF legend
goes off).
Subtask 27-24-00-220-055
C. Check for too much Play (Yellow servo control pressurized)
NOTE : For monitoring and follow up of the play at the rudder trailing
____
edge, it is recommended that the operator record in its own
documentation the values measured.
R
R

(1) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the right direction on the trailing edge.

(2) Keep this load applied and set the dial gage to zero.

(3) Release the load.

R
R

(4) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the left direction on the trailing edge.

(5) Keep this load applied and record the value shown on the dial gage.

R
R

NOTE : This value includes 8 mm (0.3149 in.) of surface bending with


____
30 daN (67.4426 lbf) load applied.

R
R

(6) Release the load.


Subtask 27-24-00-869-060
D. On the HYD section of the maintenance panel 50VU:
(1) Release the LEAK MEASUREMENT VALVES/Y pushbutton switch
(the OFF legend comes on).
(2) Push the LEAK MEASUREMENT VALVES/B pushbutton switch (the OFF legend
goes off).



EFF :
ALL
 27-24-00



AIJ




Page 615
May 01/11

Subtask 27-24-00-220-056
E. Check for too much Play (Blue servo control pressurized)
NOTE : For monitoring and follow up of the play at the rudder trailing
____
edge, it is recommended that the operator record in its own
documentation the values measured.
R
R

(1) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the right direction on the trailing edge.

(2) Keep this load applied and set the dial gage to zero.

(3) Release the load.

R
R

(4) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the left direction on the trailing edge.

(5) Keep this load applied and record the value shown on the dial gage.

R
R

NOTE : This value includes 8 mm (0.3149 in.) of surface bending with


____
30 daN (67.4426 lbf) load applied.

R
R

(6) Release the load.


5. Close-up
________
Subtask 27-24-00-080-054
A. Removal of the Tools
(1) Remove the PIN-RIGGING (98D27207546000) (2) or TBD (98D27207516000)
pin (98D27207516090) from the input lever of the lower servocontrol
(1).
(2) Remove the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000), the GAGE ASSY - PUSH-PULL TOOL GAGE,ASSY-PUSH-PULL
(97A27003000007), and the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) from the rudder.



EFF :
ALL
 27-24-00



AIJ




Page 616
May 01/11

Subtask 27-24-00-942-054
B. Put the aircraft back to its initial configuration
(1) On the HYD section of the maintenance panel 50VU :
- push the LEAK MEASUREMENT VALVES/G and LEAK MEASUREMENT VALVES/Y
pushbutton switches (the OFF legends of these pushbutton switches
go off).
(2) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) Remove the warning notice(s).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-24-00-410-056
C. Close Access
(1) Close the access doors 325BL, 325BR, 325CL, 325CR, 325DL, 325DR,
325EL, 325ER.
(2) Remove the access platform(s).
Subtask 27-24-00-862-055
D. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-24-00


R 
AIJ




Page 617
May 01/11

TASK 27-24-00-210-001
Visual Inspection of the Rudder Servo Controls for Hydraulic Leakage
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
R

29-24-00-864-001
27-24-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 606



EFF :
ALL
 27-24-00



AIJ




Page 618
May 01/11

3. __________
Job Set-up
Subtask 27-24-00-010-053
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at zone 325
(2) Open the access doors 325CL, 325DL, 325CR, 325DR
Subtask 27-24-00-860-051
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
(2) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003)
4. Procedure
_________
Subtask 27-24-00-210-051
A. Visual Inspection of the Rudder Servocontrol for Hydraulic Leakage
WARNING : DO NOT TOUCH THE SERVO CONTROLS DURING OPERATION OF THE PEDALS.
_______
MOVEMENT OF THE SERVO CONTROLS CAN CAUSE INJURY.
(1) Do several cycles of the rudder with the CAPT or F/O pedals.
WARNING : MAKE SURE THAT PERSONS DO NOT OPERATE THE PEDALS WHEN YOU
_______
CLEAN THE VENT HOLE. OPERATION OF THE SERVO CONTROL WHEN
YOU CLEAN THE VENT HOLE CAN BE DANGEROUS.
(2) Clean the vent hole (1) and the area around the vent hole of each
servocontrol
(Ref. Fig. 606/TASK 27-24-00-991-002)

(3) Do again several cycles of the rudder with the CAPT or F/O pedals.
(4) Do a visual check of the vent hole and the area around the vent hole.
Make sure that you can see no leak.



EFF :
ALL
 27-24-00



AIJ




Page 619
May 01/11

Servocontrol - Location of the Vent Hole


Figure 606/TASK 27-24-00-991-002



EFF :
ALL
 27-24-00



AIJ




Page 620
May 01/11

5. Close-up
________
Subtask 27-24-00-860-052
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003)
(2) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002)
Subtask 27-24-00-410-052
B. Close Access
(1) Close the access doors 325CL, 325DL, 325CR, 325DR
(2) Remove the access platform(s).



EFF :
ALL
 27-24-00



AIJ




Page 621
May 01/11

SERVO CONTROL - RUDDER (1025GM,2025GM,3025GM) - REMOVAL/INSTALLATION


____________________________________________________________________
TASK 27-24-51-000-001
Removal of the Rudder Servo Control 1025GM/2025GM/3025GM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
CAUTION : MAKE SURE THAT ONE SERVO CONTROL IS INSTALLED AT ALL TIMES. IF YOU
_______
MUST REMOVE ALL THREE SERVO CONTROLS, FIRST DO THE INSTALLATION,
ADJUSTMENT AND TEST PROCEDURES FOR ONLY ONE OF THE SERVO CONTROLS. IF
YOU REMOVE ALL THREE SERVO CONTROLS AT THE SAME TIME, DAMAGE TO THE
AIRCRAFT CAN OCCUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No

specific
specific
specific
specific
specific

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)

R
98D27207545000
98D27207546000
98D27207548000

1 PIN-RIGGING
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-24-51



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-14-00-614-001
55-33-13-010-002
R
R
R
R

27-24-51-991-001
27-24-51-991-002
27-24-51-991-003
27-24-51-991-004

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402
Fig. 403
Fig. 404

3. __________
Job Set-up
Subtask 27-24-51-860-051
A. Aircraft Maintenance Configuration
(1) Put the rudder pedals in the neutral position.
(2) Make sure that the rudder trim control is set at the zero position.
NOTE : Make sure that the trailing edge of the rudder is in line with
____
the red triangle on the tail cone.
(3) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
Subtask 27-24-51-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-24-51



AIJ




Page 402
Feb 01/07

Subtask 27-24-51-860-050
C. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Put the warning notices in position to tell persons not to pressurize
the hydraulic systems.
(3) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
Subtask 27-24-51-010-050
D. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panels 325BL, 325CL, 325CR, 325DL at the trailing
edge of the vertical stabilizer. (Ref. TASK 55-33-13-010-002).
Subtask 27-24-51-480-050
E. Installation of the Rigging Pins
(Ref. Fig. 401/TASK 27-24-51-991-001)

R
R
R

(1) Install the rigging pin PIN-RIGGING (98D27207548000) in the


differential lever (4).

R
R

(2) Install the rigging pin PIN-RIGGING (98D27207546000) in the bellcrank


assy (6) at the servo control 1025GM (5).

R
R
R

(3) Install the rigging pin PIN-RIGGING (98D27207545000) in the travel


limitation unit (3).
4. Procedure
_________
CAUTION : MAKE SURE THAT ONE SERVO CONTROL IS INSTALLED AT ALL TIMES. IF YOU
_______
MUST REMOVE ALL THREE SERVO CONTROLS, FIRST DO THE INSTALLATION,
ADJUSTMENT AND TEST PROCEDURES FOR ONLY ONE OF THE SERVO CONTROLS.
IF YOU REMOVE ALL THREE SERVO CONTROLS AT THE SAME TIME, DAMAGE TO
THE AIRCRAFT CAN OCCUR.



EFF :
ALL
 27-24-51



AIJ




Page 403
Feb 01/11

R
R

Rudder Access Panel and Rigging Pin Locations


Figure 401/TASK 27-24-51-991-001



EFF :
ALL
 27-24-51



AIJ




Page 404
Feb 01/07

Subtask 27-24-51-020-052
A. Removal of the Rudder Servo Control 1025GM/2025GM/3025GM
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal of the upper servo control only is described. The
____
removal of the center servo control and the lower servo control is
almost the same.
(1) Remove the cable assembly and the clamp (only at upper servo control
2025GM) as follows:
(Ref. Fig. 402/TASK 27-24-51-991-002)
(a) Remove and discard the cotter pin (13).
(b) Remove the nut (12).
(c) Remove the screw (9) and the washer (8) from the clamp (10) and
the eye-end (11).
NOTE : Do not disconnect the cable from the structure unless a
____
new installation is necessary.
(2) Disconnect the hydraulic system as follows:
(Ref. Fig. 403/TASK 27-24-51-991-003)
(a) Put the CONTAINER 5 L(1 1/2 USGAL) below the hydraulic
connections (30),(37) to collect the unwanted fluid.
(b) Disconnect the union nut (38) of the pipe (37) from the union
(39) at the pressure port of the servo control (5).
(c) Disconnect the union nut (29) of the pipe (30) from the union
(28) at the return port of the servo control (5).
(d) Drain the remaining hydraulic fluid into the container.
(e) Put the blanking caps on the pipes (30),(37).
(f) Put the blanking caps on the unions (28),(39) of the servo
control (5).



EFF :
ALL
 27-24-51


R 
AIJ




Page 405
Feb 01/11

R
R

Rudder Servo Controls


Figure 402/TASK 27-24-51-991-002



EFF :
ALL
 27-24-51



AIJ




Page 406
Feb 01/07

Servo Control Connection at the Vertical Stabilizer


Figure 403/TASK 27-24-51-991-003



EFF :
ALL
 27-24-51



AIJ




Page 407
Feb 01/11

(g) Remove the screw (31) and the washer (32) and disconnect the
bonding jumper (33) from the servo control (5).
NOTE : Do not disconnect the bonding jumper (33) from the
____
structure unless a repair or a new installation is
necessary.
(3) Disconnect the spring rod (21) from the input lever (17) of the servo
control (5) as follows:
(Ref. Fig. 403/TASK 27-24-51-991-003)
(a) Remove and discard the cotter pin (27).
(b) Remove the nut (26), the washer (25) and the screw (18).
(c) Move the end of the spring rod (21) away from the input lever
(17).
(d) Temporarily safety the flanged bushes (19),(24) and the sliding
bush (20) in the input lever (17).
(4) Disconnect the servo control (5) from the bracket (65) of the rudder
(2) as follows:
(Ref. Fig. 404/TASK 27-24-51-991-004)
(a) Remove and discard the cotter pin (98).
(b) Remove the locking cap (97), the nut (96), the washers (90) and
the washer (95).
NOTE : Do not remove the bolt (62) at this time.
____
(5) Disconnect the servo control (5) from the bracket (52) of the
vertical stabilizer (1) as follows:
(Ref. Fig. 403/TASK 27-24-51-991-003)
(a) Remove and discard the cotter pin (88).
(b) Remove the locking cap (87), the nut (86), the washers (89) and
the washer (85).
NOTE : The servo control weighs approx. 5.5 kg (12.1254 lb).
____
(6) Remove the bolt (62) from the bracket (65) of the rudder (2).
(7) Remove the bolt (55) from the bracket (52) of the vertical stabilizer
(1).



EFF :
ALL
 27-24-51


R 
AIJ




Page 408
Feb 01/11

R
R

Servo Control Connection at the Rudder


Figure 404/TASK 27-24-51-991-004



EFF :
ALL
 27-24-51



AIJ




Page 409
Feb 01/07

(8) Remove the servo control (5) together with the the clamp (10) from
the brackets (65),(52).
(9) Remove the sealing rings (74),(35) from the eye-end bearings of the
servo control (5).
(10) Remove the locking plate (64), the washer (77) and the bushes
(73),(75) from the bracket (65) of the rudder (2).
R
R

(11) Remove the locking plate (53) and the bushes (34),(36) from the
bracket (52) of the vertical stabilizer (1).
(12) Remove the clamp (10) from the servo control (5).



EFF :
ALL
 27-24-51



AIJ




Page 410
Feb 01/11

TASK 27-24-51-400-001
Installation of the Rudder Servo Control 1025GM/2025GM/3025GM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
CAUTION : MAKE SURE THAT ONE SERVO CONTROL IS INSTALLED AT ALL TIMES. IF YOU
_______
MUST REMOVE ALL THREE SERVO CONTROLS, FIRST DO THE INSTALLATION,
ADJUSTMENT AND TEST PROCEDURES FOR ONLY ONE OF THE SERVO CONTROLS. IF
YOU REMOVE ALL THREE SERVO CONTROLS AT THE SAME TIME, DAMAGE TO THE
AIRCRAFT CAN OCCUR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

No specific
R
R

No specific

1
2
1
2

warning notices
ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
CAP - BLANKING
CONTAINER 5 L(1 1/2 USGAL)
GAGE - FEELER
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-24-51



AIJ




Page 411
Feb 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27207545000
98D27207546000
98D27207548000

1 PIN-RIGGING
1 PIN-RIGGING
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
Material No. 04-004

lockwire, corrosion-resistant steel, dia 0.8 mm


(0.032 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-018


Material No. 05-005
R
R

Material No. 11-026

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------27

cotter pin

27-21-04 08 -050



EFF :
ALL
 27-24-51



AIJ




Page 412
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-24-00-710-001
27-24-00-710-002
27-24-00-820-001
29-00-00-864-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
29-14-00-614-002
51-75-13-916-002
55-33-13-010-002
55-33-13-410-002
27-24-51-991-001
27-24-51-991-002
27-24-51-991-003
27-24-51-991-004

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the Rudder Hydraulic Actuation
Operational Test of the Rudder Servocontrols with
Individual Hydraulic System
Adjustment of the Rudder Neutral Position
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Repair to a layer of Corrosion Preventive Compound
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401
Fig. 402
Fig. 403
Fig. 404



EFF :
ALL
 27-24-51


R 
AIJ




Page 413
Feb 01/11

3. __________
Job Set-up
Subtask 27-24-51-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-24-51-860-053
B. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access panels 325CL, 325CR, 325BL, 325DL at the
trailing edge of the vertical stabilizer are opened (Ref. TASK 55-3313-010-002).
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the rudder trim control is set at the zero position.
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.
(6) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Make sure that the reservoirs of the Green, Blue and Yellow hydraulic
systems are depressurized.
(Ref. TASK 29-14-00-614-001).

R
R
R

(8) Make sure that the rigging pin PIN-RIGGING (98D27207548000) is


installed in the differential lever (4).

R
R

(9) Make sure that the rigging pin PIN-RIGGING (98D27207546000) is


installed in the bellcrank assy (6) at the servo control 1025GM (5).



EFF :
ALL
 27-24-51



AIJ




Page 414
Feb 01/11

(10) Make sure that the rigging pin PIN-RIGGING (98D27207545000) is


installed in the travel limitation unit (3).
4. Procedure
_________
CAUTION : MAKE SURE THAT ONE SERVO CONTROL IS INSTALLED AT ALL TIMES. IF YOU
_______
MUST REMOVE ALL THREE SERVO CONTROLS, FIRST DO THE INSTALLATION,
ADJUSTMENT AND TEST PROCEDURES FOR ONLY ONE OF THE SERVO CONTROLS.
IF YOU REMOVE ALL THREE SERVO CONTROLS AT THE SAME TIME, DAMAGE TO
THE AIRCRAFT CAN OCCUR.
Subtask 27-24-51-910-051
A. Preparation for the Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Do a visual check of the identification placard on the servo control:
- 1025GM.
for the lower servo control connected to the Green hydraulic
system,
- 3025GM
for the center servo control connected to the Yellow hydraulic
system,
- 2025GM
for the upper servo control connected to the Blue hydraulic system.
(2) Make sure that the structure, the paintwork, the rudder control
surface and the bonding jumpers are clean and in the correct
condition.
(3) Clean the attachment brackets, the bushes and the locking plates with
the CLEANING AGENTS (Material No. 11-026) and let them dry.

(4) Make sure that the bolts, the screws, the nuts, the bushes and the
locking plates show no corrosion and are not damaged.
(5) Apply the COMMON GREASE (Material No. 04-018) to all the bolts and
the bushes.



EFF :
ALL
 27-24-51



AIJ




Page 415
Aug 01/11

Subtask 27-24-51-420-051
B. Installation of the Rudder Servo Control 1025GM/2025GM/3025GM
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation of the upper servo control only is described. The
____
installation of the center servo control and the lower servo
control is almost the same.
(1) Install the bushes (34) and (36) in the bracket (52) of the vertical
stabilizer (1).
R
R

(2) Install the locking plate (53) in the bracket (52) of the vertical
stabilizer (1).
(3) Install the bushes (73) and (75) in the bracket (65) of the rudder
(2).
(4) Install the washer (77) and the locking plate (64) in the bracket
(65) of the rudder (2).
(5) Put the clamp (10) on the servo control (5).
(6) Put the servo control (5) in position at the bracket (52), (65).
(7) Make sure that the items that follow are correctly installed in the
brackets (52) and (65):
- The locking plates (53) and (64)
- The washer (77)
- The bushes (34), (36), (73) and (75).



EFF :
ALL
 27-24-51



AIJ




Page 416
Feb 01/11

(8) Connect the servo control (5) to the bracket (52) of the vertical
stabilizer (1) as follows:
(Ref. Fig. 403/TASK 27-24-51-991-003)
NOTE : In this procedure it is necessary for two persons to install
____
the items that follow in the bracket (52):
- The servo control (5)
- The sealing rings (35).
(a) Apply a thin layer of the COMMON GREASE (Material No. 04-004) to
the sealing rings (35).
(b) Attach the sealing rings (35) in position at the eye-end bearing
of the servo control (5).
(c) Use the two GAGE - FEELER 0.25 mm (0.0098 in.) thick to carefully
move the servo control (5) into the bracket (52).
(d) Align the eye-end bearing of the servo control (5) and the
sealing rings (35). Do this with the bolt hole in the bracket
(52).
(e) Install the bolt (55) through the connection of the bracket (52)
and the servo control.
(f) Install the washer (85), the washers (89) and the nut (86) on the
bolt (55).
(g) TORQUE the nut (86) to between 7.0 and 8.0 m.daN (51.62 and 58.99
lbf.ft).
(h) Install the locking cap (87) and the cotter pin (88).
(9) Connect the servo control (5) to the bracket (65) of the rudder (2)
as follows:
(Ref. Fig. 404/TASK 27-24-51-991-004)
NOTE : In this procedure it is necessary for two persons to install
____
the items that follow in the bracket (65):
- The servo control (5)
- The sealing rings (74).
(a) Apply a thin layer of the COMMON GREASE (Material No. 04-004) to
the sealing rings (74).
(b) Attach the sealing rings (74) in position at the eye-end bearing
of the servo control (5).



EFF :
ALL
 27-24-51


R 
AIJ




Page 417
Feb 01/11

(c) Use the two GAGE - FEELER 0.25 mm (0.0098 in.) thick to carefully
move the servo control (5) into the bracket (65).
(d) Align the eye-end bearing of the servo control (5) and the
sealing rings (74). Do this with the bolt hole in the bracket
(65).
(e) Install the bolt (62) through the connection of the bracket (65)
and the servo control (5).
(f) Install the washer (95), the washers (90) and the nut (96) on the
bolt (62).
(g) TORQUE the nut (96) to between 7.0 and 8.0 m.daN (51.62 and 58.99
lbf.ft).
(h) Install the locking cap (97) and the cotter pin (98).
(10) Apply a thin layer of the SPECIAL MATERIALS (Material No. 05-005)
(Ref. TASK 51-75-13-916-002) to all attachment parts made of steel
which you can see. Do not apply the SPECIAL MATERIALS (Material No.
05-005) to the spherical bearings of the servo control (5).
(11) Connect the spring rod (21) to the input lever (17) of the servo
control (5) as follows:
(Ref. Fig. 403/TASK 27-24-51-991-003)
(a) Make sure that the items that follow are clean and correctly
installed in the input lever (17):
- The flanged bushes (19) and (24).
- The sliding bush (20)
(b) Put the spring rod (21) in position in the input lever (17).
(c) Apply the SPECIAL MATERIALS (Material No. 05-005) to the screw
(18).
(d) Put the screw (18) into the connection of the input lever (17),
and the eye-end of the spring rod (21).
(e) Install the washer (25) and the nut (26) on the screw (18).



EFF :
ALL
 27-24-51


R 
AIJ




Page 418
Feb 01/11

(f) TORQUE the nut (26) to 0.8 m.daN (70.79 lbf.in) and then loosen
it to the next cotter pin hole.
(g) Safety the nut (26) with a new cotter pin (27).
(12) Connect the hydraulic system as follows:
(a) Remove the CAP - BLANKING from the unions (28) and (39) of the
servo control (5).
(b) Remove the CAP - BLANKING from the pipes (30) and (37).
(c) Make sure that the hydraulic line end-fittings are serviceable.
(d) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads
of the line end-fittings.
(e) Connect the union nut (38) of the pipe (37) to the union (39). Do
this at the pressure port of the servo control (5).
(f) TORQUE the union nut (38) to between 1.5 and 1.7 m.daN (11.06 and
12.53 lbf.ft).
(g) Connect the union nut (29) of the pipe (30) to the union (28). Do
this at the return port of the servo control (5).
(h) TORQUE the union nut (29) to between 2.0 and 2.3 m.daN (14.74 and
16.96 lbf.ft).
(i) Make sure that the pipes (30) and (37) have no deformation when
you tighten the union nuts (29) and (38). Make sure that the
pipes (30) and (37) do not touch the rear spar of the vertical
stabilizer (1).
(13) Put the bonding jumper (33) in position at the servo control (5).
Attach it with the screw (31) and the washer (32) (Ref. TASK 20-2800-912-004).
(14) Install the cable assembly and the clamp as follows:
(Ref. Fig. 402/TASK 27-24-51-991-002)

(a) Put the washer (8) on the screw (9).


(b) Put the screw (9) into the clamp (10) and the eye-end (11).
(c) Install the nut (12) on the screw (9) and safety the nut with a
new cotter pin (13).



EFF :
ALL
 27-24-51



AIJ




Page 419
Feb 01/07

Subtask 27-24-51-080-050
C. Removal of the Rigging Pins
(Ref. Fig. 401/TASK 27-24-51-991-001)

(1) Remove the rigging pin 98D27207516330, or 98D27207548000 from the


differential lever (4).
(2) Remove the rigging pin 98D27207516090, or 98D27207546000 from the
bellcrank assy (6) at the servo control 1025GM (5).
(3) Remove the rigging pin 98D27207516040, or 98D27207545000 from the
travel limitation unit (3).
Subtask 27-24-51-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2
Subtask 27-24-51-870-050
E. Bleeding Procedure of the Rudder Servo Control
NOTE : The test after replacement of the lower servo control 1025GM
____
(Green hydraulic system) only is described. The tests after
replacement of the center servo control 3025GM (Yellow hydraulic
system) and the upper servo control 2025GM (Blue hydraulic system)
are almost the same.
(1) Put the switch, A/SKID & N/W STRG, on the center panel 402VU to the
OFF position.
(2) Pressurize the reservoirs of the hydraulic systems (Ref. TASK 29-1400-614-002).
(3) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001).
(4) Make sure that the travel range of the servo controls and the rudder
are clear of tools and other items.
(5) Operate the left and the right rudder pedals to move the rudder
surface.
NOTE : Make sure that there is full and free movement of the rudder
____
pedals.



EFF :
ALL
 27-24-51



AIJ




Page 420
Feb 01/07

(6) Operate the rudder pedals ten times and then put them in the neutral
position.
(7) Make sure that there are no leaks at the hydraulic connections to the
servo control.
Subtask 27-24-51-869-053
F. Aircraft Maintenance Configuration
R
R
R

(1) Install the rigging pin PIN-RIGGING (98D27207548000) in the


differential lever.
(2) Remove the CONTAINER 5 L(1 1/2 USGAL).
(3) Remove all the signs of hydraulic fluid from the components in the
work area.
(4) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001).
(5) Make sure that the RUD TRIM indicator on the center pedestal panel
110VU, shows zero.
(6) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002)
or the Blue hydraulic system (Ref. TASK 29-10-00-863-003)).
(7) Make sure that the trailing edge of the rudder aligns with the red
reference triangle on the tail cone.
(a) If there is no red reference triangle on the tail cone, do the
adjustment of the rudder neutral position (Ref. TASK 27-24-00820-001).
(b) If the trailing edge of the rudder and the red reference triangle
do not align, refer to the procedure given in para. H.
(8) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002)
or the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(9) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001).
(10) Make sure that the rudder is in the neutral position.
NOTE : The trailing edge of the rudder aligns with the red reference
____
triangle on the tailcone.



EFF :
ALL
 27-24-51



AIJ




Page 421
Feb 01/11

Subtask 27-24-51-820-050
G. If the rudder is not in the neutral position, do this step.
(1) Adjust the spring rod
(Ref. Fig. 403/TASK 27-24-51-991-003)

(a) Cut and remove the lockwire from the nuts (22) of the spring rod
(21).
(b) Loosen the nuts (22) and the serrated locking device (23).
(c) Turn the body of the spring rod (21) until the rudder (2) is in
the neutral position.
NOTE : The trailing edge of the rudder is in line with the red
____
triangle on the tail cone.
(d) Engage the serrated locking device (23).
(e) Tighten the nuts (22) against the serrated locking device (23).
NOTE : Make sure that the threads of the rod end, block the
____
inspection holes in the body of the spring rod (21).
(f) Safety the nuts (22) with lockwire, corrosion-resistant steel,
dia 0.8 mm (0.032 in.) to the serrated locking device (23).
Subtask 27-24-51-860-054
H. Preparation for the Test
(1) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001).
(2) Remove the rigging pin 98D27207516330, or 98D27207548000 from the
differential lever.
Subtask 27-24-51-710-050
J. Test Procedure
(1) Do an operational test of the rudder system (Ref. TASK 27-24-00-710001).
(2) Do an operational test of the rudder servo controls (Ref. TASK 27-2400-710-002), if all three servo controls are replaced.



EFF :
ALL
 27-24-51



AIJ




Page 422
Feb 01/07

5. Close-up
________
Subtask 27-24-51-860-055
A. Put the aircraft back to the serviceable condition.
(1) Put the switch A/SKID & N/W STRG on the center panel 402VU to the ON
position.
(2) Remove the warning notice(s).
Subtask 27-24-51-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL, 325CL, 325CR, 325DL at the trailing
edge of the vertical stabilizer. (Ref. TASK 55-33-13-410-002).
(3) Remove the access platform(s).



EFF :
ALL
 27-24-51


R 
AIJ




Page 423
Feb 01/07

TASK 27-24-51-000-002
Removal of the Filter from the Rudder Servo Control 1025GM/2025GM/3035GM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

R
R

No specific
No specific

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-14-00-614-001
55-33-13-010-002
27-24-51-991-002

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 402



EFF :
ALL
 27-24-51



AIJ




Page 424
Feb 01/11

3. __________
Job Set-up
Subtask 27-24-51-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
(3) Put the warning notices in position to tell persons not to pressurize
the hydraulic systems.
(4) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
Subtask 27-24-51-010-051
B. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panels 325CL, 325CR at the trailing edge of the
vertical stabilizer, (Ref. TASK 55-33-13-010-002).
(3) Put the container below the servo control.
4. Procedure
_________
Subtask 27-24-51-020-053
A. Removal of the Filter
(Ref. Fig. 402/TASK 27-24-51-991-002)
NOTE : The removal of the filter (16) from the upper servo control 2025GM
____
(5) only is described. The removal of the filter (16) from the
center 3025GM and the lower 1025GM servo controls (5) is similar.
(1) Cut and remove the lockwire from the connection of the filter (16) to
the valve block (14) of the servo control (5).
(2) Remove the sealing compound from the connection of the filter (16) to
the valve block (14).



EFF :
ALL
 27-24-51



AIJ




Page 425
Feb 01/11

(3) Remove the filter (16) from the valve block (14).
(4) Remove and discard the packing (15) and the filter (16).



EFF :
ALL
 27-24-51



AIJ




Page 426
Feb 01/07

TASK 27-24-51-400-002
Installation of the Filter in the Rudder Servo Control 1025GM/2025GM/3035GM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No
No
No
No

specific
specific
specific
specific

warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-24-51



AIJ




Page 427
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 09-004
R
R

Material No. 11-026

lockwire, corrosion-resistant steel, dia 0.8 mm


(0.032 in.)
D
DA-2-657-4
SEALANT, AERODYNAMIC SMOOTHING-OBSOLETE USE 09016
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------15
16

packing
filter

27-24-51 01 -020
27-24-51 01 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
29-14-00-614-002
55-33-13-010-002
55-33-13-410-002

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR



EFF :
ALL
 27-24-51



AIJ




Page 428
Aug 01/11

3. __________
Job Set-up
Subtask 27-24-51-860-056
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access panels 325CL, 325CR at the trailing edge of
the vertical stabilizer are opened (Ref. TASK 55-33-13-010-002).
(3) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the reservoirs of the Green, Blue and Yellow hydraulic
systems are depressurized.
(Ref. TASK 29-14-00-614-001).
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.
(6) Make sure that the container is in position below the servo control.
4. Procedure
_________
Subtask 27-24-51-910-053
A. Preparation for the Installation
(1) Make sure that the servo controls are in the correct condition and
have no dammage.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.
Subtask 27-24-51-420-052
B. Installation of the Filter
NOTE : The installation of the filter (16) in the upper servo control
____
2025GM (5) only is described. The installation of the filter (16)
in the center 3025GM and lower 1025GM servo controls (5) is
similar.



EFF :
ALL
 27-24-51


R 
AIJ




Page 429
Aug 01/11

(1) Put a new packing (15) on the new filter (16).


(2) Install the filter (16) in the valve block (14).
(3) TORQUE the filter (16) to between 2.0 and 2.2 m.daN (14.74 and 16.22
lbf.ft).
(4) Safety the filter (16) with lockwire, corrosion-resistant steel, dia
0.8 mm (0.032 in.) to the valve block (14).
R

(5) Clean the seal area with CLEANING AGENTS (Material No. 11-026) to
remove all signs of hydraulic fluid.
(6) Apply SEALANTS (Material No. 09-004) to the connection of the filter
(16) and the valve block (14).
Subtask 27-24-51-870-051
C. Bleeding Procedure of the Servo Controls.
(1) Pressurize the Green, Blue and Yellow hydraulic systems (Ref. TASK
29-10-00-863-001) (Ref. TASK 29-10-00-863-002) (Ref. TASK 29-10-00863-003).
(2) Pressurize the reservoirs of the hydraulic systems (Ref. TASK 29-1400-614-002).
(3) Operate the left and the right rudder pedals to move the rudder
surface.
(4) Do this ten times and then put the rudder pedals back to the neutral
position.
(5) Make sure that there are no leaks at the filter connection to the
valve block of the servo controls.
(6) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00864-003).



EFF :
ALL
 27-24-51



AIJ




Page 430
Aug 01/11

5. Close-up
________
Subtask 27-24-51-410-051
A. Close Access
(1) Remove the CONTAINER 5 L(1 1/2 USGAL).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the access panels 325CL, 325CR at the trailing edge of the
vertical stabilizer, (Ref. TASK 55-33-13-410-002).
(4) Remove the warning notice(s).
(5) Remove the access platform(s).



EFF :
ALL
 27-24-51


R 
AIJ




Page 431
Aug 01/11

TASK 27-24-51-000-003
Removal of the Rudder Servo Control Eye End
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
56724S0000

warning notices
1 Spanner Set

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-51-000-001
27-24-51-991-006

Removal of the Rudder Servo Control


1025GM/2025GM/3025GM
Fig. 405



EFF :
ALL
 27-24-51


R 
AIJ




Page 432
Aug 01/11

3. __________
Job Set-up
Subtask 27-24-51-860-058
A. Aircraft Maintenance Configuration
(1) Put the rudder pedals in the neutral position.
(2) Make sure that the rudder trim control is set at the zero position.
(3) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
Subtask 27-24-51-020-054
B. Removal of the Rudder Servo Control
(1) Remove the rudder servo control (Ref. TASK 27-24-51-000-001).
(2) Take the rudder servo control to a workshop bench and clamp it so
that you can do work on the eye end.
4. Procedure
_________
(Ref. Fig. 405/TASK 27-24-51-991-006)
Subtask 27-24-51-020-055
A. Removal of the Rudder Servo Control Eye End
(1) Disconnect the lever (13) as follows:
(a) Remove and discard the cotter pin (10).
(b) Remove the nut (8) and the washer (9).
(c) Remove the bolt (5) and the bush (6).
(d) Release the lever (13) from the lever (11).
R

(e) Remove the bushes (12) and (14).


(2) Attach the spanner to the eye end (1).
NOTE : The spanner is part of the Spanner Set (56724S0000).
____



EFF :
ALL
 27-24-51



AIJ




Page 433
Nov 01/10

Rudder Servo Control Eye End


Figure 405/TASK 27-24-51-991-006



EFF :
ALL
 27-24-51



AIJ




Page 434
Nov 01/10

(3) Hold the piston rod (4) at the key faces and remove the eye end (1).
NOTE : A torque force of between 10.5 m.daN (77.43 lbf.ft) and 14.5
____
m.daN (106.93 lbf.ft) will be necessary to release the eye end
(1).
(4) Remove the spanner from the eye end (1).
(5) Remove the lever (2) with the lever (13) from the eye end (1).
(6) Remove the locking washer (3) from the piston rod (4).



EFF :
ALL
 27-24-51


R 
AIJ




Page 435
Nov 01/10

TASK 27-24-51-400-003
Installation of the Rudder Servo Control Eye End
R
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
56724S0000

soft brush
warning notices
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
1 Spanner Set



EFF :
ALL
 27-24-51



AIJ




Page 436
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 09-008E
Material No. 09-016
R
R

Material No. 11-026

Molykote DX
USA AMS 3277
QUICK REPAIR FUEL TA NK SEALANT TEMPORARY
(Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II
CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-51-000-001
27-24-51-400-001

Removal of the Rudder Servo Control


1025GM/2025GM/3025GM
Installation of the Rudder Servo Control
1025GM/2025GM/3025GM

CMM 272101
27-24-51-991-006

Fig. 405

3. __________
Job Set-up
Subtask 27-24-51-860-057
A. Aircraft Maintenance Configuration
(1) Make sure that the rudder pedals are in the neutral position.
(2) Make sure that the rudder trim control is set at the zero position.
(3) Make sure that the warning notices are in position to tell persons
not operate the flight controls.
(4) Make sure that the rudder servo control is removed (Ref. TASK 27-2451-000-001).



EFF :
ALL
 27-24-51



AIJ




Page 437
Aug 01/11

4. Procedure
_________
(Ref. Fig. 405/TASK 27-24-51-991-006)
Subtask 27-24-51-210-054
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the rudder servo control is clamped securely to the
workshop bench and that you have access to the piston rod (4).
R
R

(2) Clean all the parts retained from the removed component with CLEANING
AGENTS (Material No. 11-026) and a soft brush.
(3) Make sure that the parts retained from the removed component are in
the correct condition.
(4) Apply Molykote DX to the thread, the shaft and the flange of the eye
end (1) and to the contact surfaces of the locking washer (3).
Subtask 27-24-51-420-053
B. Installation of the Rudder Servo-Control Eye-End
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Assemble the levers (2) and (13) and the locking washer (3) on the
eye-end (1).



EFF :
ALL
 27-24-51



AIJ




Page 438
Aug 01/11

(2) Apply the sealants.


WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE
_______
THIS/THESE MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
(a) Apply the SEALANTS (Material No. 09-008E) to the threads of the
end of the piston rod (4).
(3) Install the eye-end (1) with the levers (2) and (13) and the locking
washer (3) in the piston rod (4).
(4) Install the special tools:
NOTE : The spanner and the clamping jaws are part of the Spanner Set
____
(56724S0000) (Ref. CMM 272101).
(a) Attach the spanner to the eye-end (1).
(b) Attach the clamping jaws to the piston rod (4). Make sure that
the tabs of the locking washer (3) engage with the clamping jaws.
(5) Hold the piston rod (4) with the clamping jaws and TORQUE the eye-end
(1) to between 10.5 and 14.5 m.daN (77.43 and 106.93 lbf.ft).
(6) Remove the spanner and the clamping jaws from the eye-end (1) and the
piston rod (4).
(7) Make sure that the space between the end of the piston rod (4) and
the thread of the eye-end (1) is fully sealed.
R

(8) Put the lever (13) with the bushes (12) and (14) in the lever (11).
(9) Install the bolt (5) with the bush (6), the washer (9) and the nut
(8).
(10) TORQUE the nut (8) to between 0.05 and 0.15 m.daN (4.42 and 13.27
lbf.in).
(11) Safety the nut (8) with a new cotter pin (10).
(12) Apply the sealants.
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE
_______
THIS/THESE MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.



EFF :
ALL
 27-24-51



AIJ




Page 439
Nov 01/10

(a) Apply the SEALANTS (Material No. 09-016) to the cotter pin (10),
the nut (8), the washer (9) and the head of the bolt (5).
5. Close-up
________
Subtask 27-24-51-420-054
A. Install the rudder servo control (Ref. TASK 27-24-51-400-001).
Subtask 27-24-51-942-059
B. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-24-51


R 
AIJ




Page 440
Feb 01/07

TASK 27-24-51-960-001
Replacement of the Rudder Servo-Control Bearings
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 WARNING NOTICE(S)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-51-000-001
27-24-51-400-001
CMM

Removal of the Rudder Servo Control


1025GM/2025GM/3025GM
Installation of the Rudder Servo Control
1025GM/2025GM/3025GM

272101

3. __________
Job Set-up
Subtask 27-24-51-860-059
A. Aircraft Maintenance Configuration
(1) Put the rudder pedals in the neutral position.
(2) Make sure that the rudder trim control is set at the zero position.
R

(3) Put the WARNING NOTICE(S) in the flight compartment to tell persons
not to operate the flight controls.



EFF :
ALL
 27-24-51



AIJ




Page 441
Nov 01/10

Subtask 27-24-51-020-057
B. Removal of the rudder servo-control
(1) Remove the rudder servo control (Ref. TASK 27-24-51-000-001).
4. Procedure
_________
Subtask 27-24-51-960-050
A. Replacement of the rudder servo-control bearings
(1) Replace the rudder servo-control bearings (Ref. CMM 272101).
5. Close-up
________
Subtask 27-24-51-420-056
A. Install the rudder servo control (Ref. TASK 27-24-51-400-001).
Subtask 27-24-51-942-060
B. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-24-51


R 
AIJ




Page 442
Feb 01/07

SERVO CONTROL - RUDDER (1025GM,2025GM,3025GM) - INSPECTION/CHECK


________________________________________________________________
TASK 27-24-51-200-001
Check of the Rudder Servo Control Attachments
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
R
R

A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-51-000-001
27-24-51-400-001
CMM 554113
27-24-51-000-001
27-24-51-000-003
27-24-51-400-001
27-24-51-400-003
27-24-51-991-005

Removal of the Rudder Servo Control


1025GM/2025GM/3025GM
Installation of the Rudder Servo Control
1025GM/2025GM/3025GM
(for corrective action)
Removal of the Rudder Servo Control
1025GM/2025GM/3025GM (for corrective action)
Removal of the Rudder Servo Control Eye End (for
corrective action)
Installation of the Rudder Servo Control
1025GM/2025GM/3025GM (for corrective action)
Installation of the Rudder Servo Control Eye End (for
corrective action)
Fig. 601

3. __________
Job Set-up
Subtask 27-24-51-010-053
A. Remove the rudder servo control (Ref. TASK 27-24-51-000-001).



EFF :
ALL
 27-24-51



AIJ




Page 601
Feb 01/11

4. Procedure
_________
(Ref. Fig. 601/TASK 27-24-51-991-005)
Subtask 27-24-51-220-050
A. Measure of the Fits and Clearances
(1) Do an inspection of the two ends of the servo-control bearings.
(a) Make sure that the inner dimensions of the two servo-control
bearings (6) are between 19.037 mm (0.7494 in.) and 19.050 mm
(0.7500 in.).
(b) Replace the servo-control bearing(s) (6) if the dimensions are
not correct (Ref. TASK 27-24-51-000-003) and (Ref. TASK 27-24-51400-003).
(c) Replace the servo-control if you find wear (Ref. TASK 27-24-51000-001) and (Ref. TASK 27-24-51-400-001).
(2) Continue with the check of the fits and clearances in the subsequent
tables (for section C-C and section D-D).
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C,D
| 22.984 | 23.000 |
|
| 22.984 |
|
|
| OD 2
|(0.9048) |(0.9055) |
|
|(0.9048) |
|
|
|
|
|
| 0.000 | 0.037 |
|
| 0.037 |
|
|
|
| (0.0000)| (0.0014)|
|
|(0.0014)|
| C,D
| 23.000 | 23.021 |
|
|
| 23.021 |
|
| ID 1
|(0.9055) |(0.9063) |
|
|
|(0.9063) |
|
------------------------------------------------------------------------------NOTE : No wear is permitted between the bush (1) and the bush (2).
____



EFF :
ALL
 27-24-51


R 
AIJ




Page 602
Feb 01/11

R
R

Rudder Servo Control


Figure 601/TASK 27-24-51-991-005



EFF :
ALL
 27-24-51



AIJ




Page 603
Feb 01/07

(3) If necessary, replace the bush (1) (Ref. CMM 554113) and/or the bush
(2).
Subtask 27-24-51-220-051
B. Measurement of the Fits and Clearances
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C,D
| 19.024 | 19.037 |
|
| 19.024 |
|
|
| OD 3
|(0.7489) |(0.7494) |
|
|(0.7489) |
|
|
|
|
|
| 0.000 | 0.034 |
|
| 0.034 |
|
|
|
| (0.0000)| (0.0013)|
|
|(0.0013)|
| C,D
| 19.037 | 19.058 |
|
|
| 19.058 |
|
| ID 2
|(0.7494) |(0.7503) |
|
|
|(0.7503) |
|
------------------------------------------------------------------------------NOTE : No wear is permitted between the bolt (3) and the bush (2).
____
(1) If necessary, replace the bolt (3) and/or the bush (2).
Subtask 27-24-51-220-052
C. Measurement of the Fits and Clearances
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C,D
| 19.024 | 19.037 |
|
| 19.024 |
|
|
| OD 3
|(0.7489) |(0.7494) |
|
|(0.7489) |
|
|
|
|
|
| 0.000 | 0.034 |
|
| 0.034 |
|
|
|
| (0.0000)| (0.0013)|
|
|(0.0013)|
| C,D
| 19.037 | 19.058 |
|
|
| 19.058 |
|
| ID 4
|(0.7494) |(0.7503) |
|
|
|(0.7503) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-24-51



AIJ




Page 604
Aug 01/08

NOTE : No wear is permitted between the bolt (3) and the bush (4).
____
(1) If necessary, replace the bolt (3) and/or the bush (4).
Subtask 27-24-51-220-053
D. Measurement of the Fits and Clearances
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C,D
| 22.984 | 23.000 |
|
| 22.984 |
|
|
| OD 4
|(0.9048) |(0.9055) |
|
|(0.9048) |
|
|
|
|
|
| 0.000 | 0.037 |
|
| 0.037 |
|
|
|
| (0.0000)| (0.0014)|
|
|(0.0014)|
| C,D
| 23.000 | 23.021 |
|
|
| 23.021 |
|
| ID 5
|(0.9055) |(0.9063) |
|
|
|(0.9063) |
|
------------------------------------------------------------------------------NOTE : No wear is permitted between the bush (4) and the bush (5).
____
R
R

(1) If necessary, replace the bush (4) and/or the bush (5) (Ref. CMM
554113).
5. Close-up
________
Subtask 27-24-51-410-055
A. Install the rudder servo control (Ref. TASK 27-24-51-400-001).



EFF :
ALL
 27-24-51



AIJ




Page 605
Aug 01/08

RUDDER POSITION INDICATING - DESCRIPTION AND OPERATION


______________________________________________________
1. _______
General
(Ref. Fig. 001)
The position of the rudder is shown on the lower
system.
This position is transmitted to the SDAC through
A triangle NSA950200 is sticked on the tail cone
position, the center of gravity of this triangle
lower trailing edge

display unit of the ECAM


a position transducer.
structure. At the zero
is in line with the rudder

NOTE : The rudder trim travel is shown on the rudder trim indicator in the
____
form of a digital value. This information is supplied by the FAC
through a position transducer installed on trim actuator (Ref.27-22).



EFF :
ALL
 27-25-00


R 
AIJ




Page 1
Feb 01/07

Special Reference Mark


Figure 001


EFF :
ALL
 27-25-00



AIJ




Page 2
Feb 01/07

RUDDER POSITION INDICATING - ADJUSTMENT/TEST


____________________________________________
TASK 27-25-00-820-001
Adjustment of the Rudder Position Indicating
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
98D27207516000
98D27207546000

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 TBD
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)



EFF :
ALL
 27-25-00



AIJ




Page 501
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-24-00-710-001
27-24-00-820-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
27-25-00-991-002
27-25-00-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Rudder Hydraulic Actuation
Adjustment of the Rudder Neutral Position
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 501
Fig. 502

3. __________
Job Set-up
Subtask 27-25-00-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
zone 325.
(2) Open the access doors 325BL, 325BR, 325CL, 325CR.



EFF :
ALL
 27-25-00



AIJ




Page 502
Feb 01/11

Subtask 27-25-00-865-050
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-25-00-860-051
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU, make sure that the FLT CTL/FAC1
pushbutton switch is pushed (on this pushbutton switch, the OFF and
FAULT legends are off).
(3) On the overhead panel 24VU, make sure that the FLT CTL/FAC2
pushbutton switch is pushed (on this pushbutton switch, the OFF and
FAULT legends are off).
(4) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows O.
(5) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(6) On the tail cone, make sure that the lower part of the rudder
trailing edge is aligned at 0 +3 -3 mm (0.0000 +0.1181 -0.1181 in.)
with the center of gravity of the reference triangle. If it is not
the case, do the adjustment of the rudder neutral position with the
reference triangle (Ref. TASK 27-24-00-820-001).
(Ref. Fig. 501/TASK 27-25-00-991-002)
R

(7) Install the PIN-RIGGING (98D27207546000) (1) or TBD (98D27207516000)


pin (98D27207516090) on the input lever of the lower servocontrol
(2).
(Ref. Fig. 502/TASK 27-25-00-991-001)



EFF :
ALL
 27-25-00



AIJ




Page 503
Feb 01/11

R
R

Tolerance Range for the Rudder Surface at the Zero Position


Figure 501/TASK 27-25-00-991-002



EFF :
ALL
 27-25-00



AIJ




Page 504
Feb 01/07

R
R

Rigging - Location
Figure 502/TASK 27-25-00-991-001



EFF :
ALL
 27-25-00



AIJ




Page 505
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 502/TASK 27-25-00-991-001)


Subtask 27-25-00-820-050
A. Adjustment of the Rudder Position Indication
(1) Push the pin (4) of the transducer unit (5).
NOTE : The pin (4) is part of the transducer unit (5).
____
You must push the pin (4) freely. If this is not the case, adjust the
length of the rod (3) as follows :
(a) Cut and remove the lockwire from the nuts.
(b) Loosen the nuts.
(c) Release the lockwashers.
(d) Adjust the length of the rod (3) until you can push the pin (4)
freely.
(e) Engage the lockwashers.
(f) Tighten the nuts.
(g) Make sure that the adjustment is correct after you have tightened
the nuts.
(h) Safety the nuts with Lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).
(i) Remove the rigging pin (1) from the input lever of the lower
servocontrol (2).
(Ref. Fig. 502/TASK 27-25-00-991-001)

(j) Make sure that the pin (4) is disengaged from the input lever of
the transducer unit (5).
Subtask 27-25-00-710-050
B. Operational Test
(1) Do the operational test of the rudder control mechanism (Ref. TASK
27-24-00-710-001).



EFF :
ALL
 27-25-00



AIJ




Page 506
Feb 01/07

5. Close-up
________
Subtask 27-25-00-860-050
A. Put the aircraft back to its initial configuration
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-25-00-410-050
B. Close Access
(1) Close the access doors 325BL, 325BR, 325CR, 325CL.
(2) Remove the access platform(s).



EFF :
ALL
 27-25-00


R 
AIJ




Page 507
Feb 01/07

TRANSDUCER UNIT - RUDDER POSITION (42WV) - REMOVAL/INSTALLATION


_______________________________________________________________
TASK 27-25-17-000-001
Removal of the Rudder Position Transducer Unit 42WV
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27207516000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE
1 PIN-RIGGING,SET

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-25-17



AIJ




Page 401
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------55-33-13-010-002
R

27-25-17-991-001

Opening/Removal of the Trailing Edge Access-Panels


325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
Subtask 27-25-17-865-053
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-25-17-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.



EFF :
ALL
 27-25-17



AIJ




Page 402
Feb 01/07

(6) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.
(7) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(8) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
Subtask 27-25-17-865-051
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-25-17-010-050
D. Get Access
(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panels 325BL, 325BR, 325CL, 325CR at the trailing
edge of the vertical stabilizer (Ref. TASK 55-33-13-010-002).
Subtask 27-25-17-860-053
E. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
R
R

(4) Put the rigging pin 98D27207516090, part of PIN-RIGGING,SET


(98D27207516000) in the input lever of the servo control.



EFF :
ALL
 27-25-17



AIJ




Page 403
Aug 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-25-17-991-001)
Subtask 27-25-17-020-050
A. Removal of the Rudder Position Transducer Unit 42WV
(1) Disconnect the electrical connector (24) from the plug (23).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Disconnect the push-rod (4) from the transducer unit (3) as follows:
(a) Remove and discard the cotter pin (14).
(b) Remove the nut (13), the washer (12) and the screw (5) from the
lever (15).
(c) Move the push-rod (4) clear of the lever (15).
(d) Remove the bush (11) from the lever (15).
(4) Remove the transducer unit (3) from the support bracket (6) as
follows:
(a) Remove and discard the cotter pins (18).
(b) Remove the nut (17), the washer (16) and the screw (8) and
disconnect the bonding jumpers (9) and (22).
NOTE : Do not disconnect the bonding jumper (22) from the bonding
____
clamp (26) unless a repair or a new installation is
necessary.
(c) Support the transducer unit (3) and remove the nuts (17), the
washers (16) and the screws (7).
(d) Remove the transducer unit (3) from the support bracket (6).
NOTE : Do not disconnect the bonding jumper (9) from the hinge
____
arm (10) unless a repair or a new installation is
necessary.



EFF :
ALL
 27-25-17



AIJ




Page 404
Nov 01/10

R
R

Rudder Position Transducer Unit 42WV


Figure 401/TASK 27-25-17-991-001



EFF :
ALL
 27-25-17



AIJ




Page 405
Feb 01/07

TASK 27-25-17-400-001
Installation of the Rudder Position Transducer Unit 42WV
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
98D27207516000
98D27207548000

warning notices
access platform 11.0 m (36 ft. 1 in.)
1 PIN-RIGGING,SET
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-005
R
R

Material No. 11-026

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-25-17



AIJ




Page 406
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------18

cotter pins

27-25-04 01 -090

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-24-00-710-001
27-25-00-820-001
29-00-00-864-001
51-75-13-916-002
55-33-13-010-002
55-33-13-410-002
R

27-25-17-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the Rudder Hydraulic Actuation
Adjustment of the Rudder Position Indicating
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Repair to a layer of Corrosion Preventive Compound
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-25-17-991-001)


Subtask 27-25-17-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the rudder pedals are in the neutral position.



EFF :
ALL
 27-25-17



AIJ




Page 407
Feb 01/07

(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(7) Make sure that the access platform is in position.
(8) Make sure that the access panels 325BL, 325BR, 325CL, 325CR are open
(Ref. TASK 55-33-13-010-002).
R

(9) Make sure that the rigging pin PIN-RIGGING,SET (98D27207516000) or


PIN-RIGGING is installed in the input lever of the lower servo
control.
Subtask 27-25-17-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-25-17-991-001)
Subtask 27-25-17-910-050
A. Preparation for the Installation

R
R

(1) Clean the interface of the support bracket (6) with CLEANING AGENTS
(Material No. 11-026) and let it dry.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-25-17



AIJ




Page 408
Aug 01/11

(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(5) Apply COMMON GREASE (Material No. 04-004) to the bush (11) and the
screws (5) and (7).
(6) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-005)
(Ref. TASK 51-75-13-916-002) to the component interface of the
transducer 42WV (3) and the support bracket (6).
NOTE : Make sure that the bonding areas on the transducer 42WV (3)
____
and the support bracket (6) stay clean.
Subtask 27-25-17-420-050
B. Installation of the Rudder Position Transducer Unit 42WV
(1) Install the transducer unit (3) to the support bracket (6) as
follows:
(a) Put the transducer unit (3) in position at the support bracket
(6) and attach it with the screws (7), the washers (16) and the
nuts (17).
(b) Put the bonding jumpers (9) and (22) in position and attach them
with the screw (8), the washer (16) and the nut (17) (Ref. TASK
20-28-00-912-004).
(c) Tighten the nuts (17) and safety them with the new cotter pins
(18).
Subtask 27-25-17-865-050
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2, 15CC.
Subtask 27-25-17-820-050
D. Adjustment Procedure
(1) Remove the rigging pin (27) from the housing of the transducer unit
(3).
(2) Move the rigging pin (27) into the lever (15) so that it engages with
the housing of the transducer unit (3).



EFF :
ALL
 27-25-17


R 
AIJ




Page 409
Feb 01/07

(3) If you can not install the rigging pin (27) easily, do an adjustment
of the rudder position indicating (Ref. TASK 27-25-00-820-001).
(4) Put the rigging pin (27) back into related the housing of the
trancuder unit (3).
NOTE : The rigging pin (27) is a part of the transducer (3).
____
Subtask 27-25-17-710-050
E. Test Procedure
(1) Remove the rigging pin 98D27207516090 from the input lever of the
lower servo control.
(2) Do an operational test of the rudder-position indicating system
(Ref. TASK 27-24-00-710-001).
5. Close-up
________
Subtask 27-25-17-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL, 325CL, 325BR, 325CR (Ref. TASK 55-3313-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-25-17


R 
AIJ




Page 410
Feb 01/07

YAW DAMPER ACTUATION - DESCRIPTION AND OPERATION


________________________________________________
1. _______
General
(Ref. Fig. 001)
Two electrohydraulic yaw damper servo-actuators under the control of the
FACs (Ref. 22-61) are installed between the artificial feel and trim unit
and the travel limitation unit (TLU). They drive the aft control via a
differential linkage.
The yaw damper servo-actuator orders are added to those of the pilots up to
the maximum travel that the TLU permits.
One of the two servo-actuators is active, the other remains in standby
(bypass mode).
In the event of a double hydraulic failure, a centering spring rod sets the
two yaw damper servo-actuators to the neutral position.
2. Component
__________________
Location
(Ref. Fig. 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------3CC1
SERVO ACTR-YAW DAMPER, 1
325 325BL
27-26-51
3CC2
SERVO ACTR-YAW DAMPER, 2
325 325BR
27-26-51
3. _____________________
Component Description
A. Yaw Damper Servo-Actuator
(Ref. Fig. 003)
(1) General
The two electrohydraulic servo-actuators are interchangeable.
Each servo-actuator includes :
- one piston with a transducer unit (LVDT) isolated from the
hydraulic fluid
- one valve group which includes mainly :
one servovalve (2)
two solenoid valves (1)
two mode selector valves (3)
one pressure switch (5)
The design is such that a single failure cannot prevent the selection
of the bypass mode.



EFF :
ALL
 27-26-00



AIJ




Page 1
Feb 01/07

4. _________
Operation
(Ref. Fig. 003)
A. Normal operation with the actuator pressurized
The servo-actuator pressurization directly involves the supply of the
servovalve (2) by the HP system.
(1) Yaw damper in the active mode
The two solenoid valves (1) must be energized to set the two selector
valves (3) to the active mode ; i.e to connect the two piston
chambers to the servovalve outputs.
Then, the servo-actuator is put in the active mode and the pressure
switch (5) is not activated.
The feedback transducer (LVDT) (4) provides the servoloop feedback.
(2) Yaw damper in the bypass mode (standby configuration)
The two solenoid valves (1) are de-energized and the associated
selector valves (3) are set to the bypass mode under the action of
their spring.
This permits the interconnection of the two piston chambers. In this
case, the pressure switch (5) is not activated.
B. Operation in case of a simple electrical failure
One solenoid valve is de-energized and the operation is identical to that
of para. 2 (b).
But the pressure switch is activated because the two selector valves are
not in the same position.
C. Operation after a hydraulic failure
With no hydraulic pressure, the two selector valves (3) are set to the
bypass mode under the action of their springs, thus the two chambers of
the piston are interconnected.
In this case, the pressure switch (5) is not activated.
D. Maintenance and rigging facilities
The maintenance is on condition.
The items below are Line Replaceable Units :
- filter
- servovalve
- solenoid valves
- pressure switch
No rigging operation is necessary to replace the yaw damper.



EFF :
ALL
 27-26-00



AIJ




Page 2
Feb 01/07

Yaw Damper Servo-Actuators - General


Figure 001

EFF :
ALL
 27-26-00




AIJ




Page 3/4
Feb 01/07

Yaw Damper Servo-Actuator - Location


Figure 002


EFF :
ALL
 27-26-00



AIJ




Page 5
Feb 01/07

Yaw Damper Servo Actuator


Figure 003


EFF :
ALL
 27-26-00



AIJ




Page 6
Feb 01/07

YAW DAMPER ACTUATION - DEACTIVATION/REACTIVATION


________________________________________________
TASK 27-26-00-040-001
Deactivation of the Yaw Damper Servo-Actuator 3CC1 (3CC2)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 22-63-01
Yaw Dampers
System 1(2)
(FAA Only)
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)

No
No
No
No
No

specific
specific
specific
specific
specific

tie-wrap
warning notice
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)
2 PLUG-BLANKING(AS21913 TYPE)



EFF :
ALL
 27-26-00



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
24-42-00-861-001
24-42-00-862-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
29-14-00-614-002
27-26-00-991-002

Operational Test of the Yaw Damper Function


Energize the Ground Service Network from the External
Power
De-energize the Ground Service Network Supplied from
the External Power
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Fig. 401

3. __________
Job Set-up
Subtask 27-26-00-860-050
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) Make sure that hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
(3) Put the warning notice in the cockpit to tell persons not to operate
the flight controls.



EFF :
ALL
 27-26-00


R 
AIJ




Page 402
Aug 01/09

Subtask 27-26-00-865-054
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 3CC1
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
FOR 3CC2
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-00-010-054
C. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position below the
access door 325BL (325BR).
(2) Open the access door 325BL (325BR).
4. Procedure
_________
Subtask 27-26-00-040-050
A. Deactivation of the Yaw Damper Servo-Actuator 3CC1 (3CC2).
(Ref. Fig. 401/TASK 27-26-00-991-002)
(1) Make sure that there is no hydraulic leakage from the yaw damper
servo-actuator (1).
If there are leaks:
(a) Depressurize the Green (Yellow) hydraulic reservoir (Ref. TASK
29-14-00-614-001).
R

(b) Put a CONTAINER 5 L(1 1/2 USGAL) below the hydraulic connections
of the yaw damper servo-actuator (1).
(c) Remove the hydraulic pipes (3) and (4).
(d) Drain the remaining hydraulic fluid into the container.
(e) Remove the container.



EFF :
ALL
 27-26-00



AIJ




Page 403
Aug 01/11

R
R

Yaw Damper Servo-Actuator 3CC1 (3CC2)


Figure 401/TASK 27-26-00-991-002



EFF :
ALL
 27-26-00



AIJ




Page 404
Feb 01/07

(f) Put blanking plugs on the disconnected line ends.


NOTE : For the HP lines, you can use PLUG-BLANKING(AS21913 TYPE).
____
(g) Pressurize the Green (Yellow) hydraulic reservoir (Ref. TASK 2914-00-614-002).
(2) Disconnect the electrical connectors (2) and (5) from the yaw damper
servo-actuator (1).
R

(3) Put blanking caps on the disconnected electrical connector(s).


(4) Attach the electrical connectors (2) and (5) with a tie-wrap.
Subtask 27-26-00-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 3CC1
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
FOR 3CC2
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-00-710-053
C. Tests
(1) Do the operational test of the yaw damper function (Ref. TASK 22-6300-710-001).
NOTE : The yaw damper servo-actuator 3CC1 (3CC2) you deactivated does
____
not operate.



EFF :
ALL
 27-26-00



AIJ




Page 405
Feb 01/11

5. Close-up
________
Subtask 27-26-00-941-053
A. Safety Precautions
(1) Remove the warning notice(s).
(2) Put a warning notice in the cockpit to tell the crew that the yaw
damper servo-actuator 3CC1 (3CC2) is deactivated.

(3) Make an entry in the logbook.


Subtask 27-26-00-860-051
B. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).

Subtask 27-26-00-410-053
C. Close Access
(1) Close the access doors 325BL (325BR).
(2) Remove the access platform(s).



EFF :
ALL
 27-26-00



AIJ




Page 406
May 01/09

TASK 27-26-00-440-001
Reactivation of the Yaw Damper Servo-Actuator 3CC1 (3CC2)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 22-63-01
Yaw Dampers
System 1(2)
(FAA Only)
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

circuit breaker(s) safety clip(s)


warning notice
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-26-51-000-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
TSM 272600810801
27-26-00-991-002

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Yaw Damper Servo Actuator (3CC1) and
(3CC2)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
(for corrective action)
Fig. 401



EFF :
ALL
 27-26-00



AIJ




Page 407
Feb 01/11

3. __________
Job Set-up
Subtask 27-26-00-860-052
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001)
(2) Make sure that hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
(3) Put the warning notice in the cockpit to tell persons not to operate
the flight controls.
Subtask 27-26-00-865-056
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 3CC1
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
FOR 3CC2
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-00-010-055
C. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position below the
access door 325BL (325BR).
(2) Open the access door 325BL (325BR).



EFF :
ALL
 27-26-00



AIJ




Page 408
Feb 01/11

4. Procedure
_________
Subtask 27-26-00-440-050
R

A. Reactivation of the Yaw Damper Servo-Actuator 3CC1 (3CC2).


(Ref. Fig. 401/TASK 27-26-00-991-002)
(1) If the hydraulic pipes (3) and (4) are removed:
- remove the yaw damper servo-actuator 3CC1 (3CC2) for repair
(Ref. TASK 27-26-51-000-001).

R
R

(2) If the hydraulic pipes are connected:


(a) Cut and discard the tie-wrap from the electrical connectors (2)
and (5).
(b) Remove the blanking caps from the electrical connectors (2) and
(5) and from the yaw damper servo-actuator (1).
(c) Connect the electrical connectors (2) and (5) to the yaw damper
servo-actuator (1).
Subtask 27-26-00-865-057
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 3CC1
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
FOR 3CC2
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-00-810-050

R
R

C. Do the trouble shooting of the yaw damper servo-actuator 3CC1 (3CC2) you
deactivated (Ref. TSM 272600810801).



EFF :
ALL
 27-26-00



AIJ




Page 409
May 01/09

5. Close-up
________
Subtask 27-26-00-860-053
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
Subtask 27-26-00-410-054
B. Close Access
(1) Close the access doors 325BL (325BR).
(2) Remove the access platform(s).



EFF :
ALL
 27-26-00



AIJ




Page 410
May 01/09

YAW DAMPER ACTUATION - ADJUSTMENT/TEST


______________________________________
R

TASK 27-26-00-710-001
Operational Test of the Yaw Damper Actuation
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001

Operational Test of the Yaw Damper Function

3. __________
Job Set-up
Subtask 27-26-00-860-058
A. Not applicable
4. Procedure
_________
Subtask 27-26-00-710-050
A. Do the operational test of the yaw damper actuation (Ref. TASK 22-63-00710-001).



EFF :
ALL
 27-26-00



AIJ




Page 501
Feb 01/07

TASK 27-26-00-820-001
Adjustment of the Yaw Damper Actuation
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
98D27207516000
98D27207548000
98D27207549000

1
1
2
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
TBD
PIN-RIGGING
PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)



EFF :
ALL
 27-26-00



AIJ




Page 502
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------7

cotter pin

27-21-47 01A-210

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
27-26-00-991-001

Operational Test of the Yaw Damper Function


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 501

3. __________
Job Set-up
Subtask 27-26-00-861-051
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-26-00-010-056
B. Get Access
R
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822.



EFF :
ALL
 27-26-00



AIJ




Page 503
Feb 01/11

(3) On the battery power center 105VU:


- loosen the two screws and remove the protective cover.
R
R

(4) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
zone 325.
(5) Open the access doors 325BL, 325BR.
Subtask 27-26-00-480-052
C. Not Applicable
Subtask 27-26-00-865-051
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-26-00-860-057
E. Aircraft Maintenance Configuration
(1) On the overhead panel 23VU, make sure that:
- The FLT CTL/ELAC1, FLT CTL/FAC1 and FLT CTL/SEC1 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(2) On the overhead panel 24VU, make sure that:
- The FLT CTL/ELAC2, FLT CTL/FAC2, FLT CTL/SEC2 and FLT CTL/SEC3
pushbutton switches are pushed (on these pushbutton switches, the
FAULT and OFF legends are off).



EFF :
ALL
 27-26-00



AIJ




Page 504
Feb 01/11

R
R
R
R

(3) On the overhead panel, on the ADIRS CDU:


- Set the OFF/NAV/ATT selector switch related to IR3 to NAV.
- Make sure that the OFF/NAV/ATT selector switches related to IR1 and
IR2 are in the OFF position.

(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).

(5) On the maintenance panel 50VU, make sure that:


- The HYD/LEAK MEASUREMENT VALVES/B, HYD/LEAK MEASUREMENT VALVES/G
and HYD/LEAK MEASUREMENT VALVES/Y pushbutton switches are pushed
(on these pushbutton switches, the OFF legends are off).

(6) On the center pedestal, on the panel 110VU, make sure that the RUD
TRIM indicator shows 0.

(7) Install the PIN-RIGGING (98D27207548000) (5) or TBD (98D27207516000)


pin (98D27207516330) on the mixer (4) of the artificial feel unit.
(Ref. Fig. 501/TASK 27-26-00-991-001)
4. Procedure
_________
(Ref. Fig. 501/TASK 27-26-00-991-001)
Subtask 27-26-00-820-052
A. Adjustment of the Yaw Damper Actuation
(1) Adjustment of the left yaw damper actuator
(a) Remove the cotter pin (7) and discard it.
(b) Remove the nut (8) and the washer (9).
(c) Remove the bolt (6) and disconnect the rod (11).
(d) On the maintenance panel 50VU, release the HYD/LEAK MEASUREMENT
VALVES/Y pushbutton switch (on this pushbutton switch, the OFF
legend comes on).

R
R

(e) Install the PIN-RIGGING (98D27207549000)


(98D27207516000) pin (98D27207516330) on
(10) of the yaw damper. You must install
pin easily. If not, do the adjustment of
actuator (2):
1
_

(12) or TBD
the output bellcrank
and remove the rigging
the left yaw damper

Cut and remove the lockwire from the nuts.



EFF :
ALL
 27-26-00



AIJ




Page 505
Nov 01/10

R
R

Position of the Rigging Pins


Figure 501/TASK 27-26-00-991-001



EFF :
ALL
 27-26-00



AIJ




Page 506
Feb 01/07

2
_

Loosen the nuts.

3
_

Release the lockwashers.

4
_

Adjust the length of the actuator until you can install and
remove the rigging pin (12) freely.

5
_

Engage the lockwashers.

6
_

Tighten the nuts.

7
_

Safety the nuts with Lockwire corrosion resistant steel dia


0.8 mm (0.03 in.).

(f) Remove the rigging pin (12).


(2) Adjustment of the right yaw damper actuator.
(a) On the maintenance panel 50VU :
1
_

Release the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch


(on this pushbutton switch, the OFF legend comes on).

2
_

Push the HYD/LEAK MESUREMENT VALVES/Y pushbutton switch (on


this pushbutton switch, the OFF legend goes off).

(b) On the overhead panel 23VU, release the FLT CTL/FAC1 pushbutton
switch (on this pushbutton switch, the OFF legend comes on).
R
R

(c) Install the PIN-RIGGING (98D27207549000)


(98D27207516000) pin (98D27207516330) on
(10) of the yaw damper. You must install
pin easily. If not, do the adjustment of
actuator(1):

(12) or TBD
the output bellcrank
and remove the rigging
the right yaw damper

1
_

Cut and remove the lockwire from the nuts.

2
_

Loosen the nuts.

3
_

Release the lockwashers.

4
_

Adjust the length of the actuator until you can install and
remove the rigging pin (12) freely.

5
_

Engage the lockwashers.

6
_

Tighten the nuts.



EFF :
ALL
 27-26-00



AIJ




Page 507
Nov 01/10

7
_

Safety the nuts with Lockwire corrosion resistant steel dia


0.8 mm (0.03 in.).

(d) Remove the rigging pin (12).


(3) Adjustment of the centering spring-rod
(a) On the maintenance panel 50VU, release the HYD/LEAK MEASUREMENT
VALVES/Y pushbutton switch (on this pushbutton switch, the OFF
legend comes on).
R
R

(b) Install the PIN-RIGGING (98D27207549000)


(98D27207516000) pin (98D27207516330) on
(10) of the yaw damper. You must install
pin easily. If not, do the adjustment of
(3):

(12) or TBD
the output bellcrank
and remove the rigging
the centering spring-rod

1
_

Cut and remove the lockwire from the nuts.

2
_

Loosen the nuts.

3
_

Release the lockwashers.

4
_

Adjust the length of the centering spring-rod (3) until you


can install and remove the rigging pin (12) freely.

5
_

Engage the lockwashers.

6
_

Tighten the nuts.

7
_

Safety the nuts with Lockwire corrosion resistant steel dia


0.8 mm (0.03 in.).

(4) Adjustment of the length of the rod


(a) Push the pin (14) of the transducer unit (15).
NOTE : The pin (14) is part of the transducer unit (15).
____
You must push the pin (14) in freely. If this is not the case,
adjust the length of the rod (13) as follows:
1
_

Cut and remove the lockwire from the nuts.

2
_

Loosen the nuts.

3
_

Release the lockwashers.



EFF :
ALL
 27-26-00



AIJ




Page 508
Nov 01/10

4
_

Adjust the length of the rod (13) until you can push the pin
(14) in freely.

5
_

Engage the lockwashers.

6
_

Tighten the nuts.

7
_

Make sure that the adjustment is correct after you have


tightened the nuts.

8
_

Safety the nuts with Lockwire corrosion resistant steel dia


0.8 mm (0.03 in.).

(b) Connect the rod (11) to the output bellcrank (10) of the yaw
damper with the bolt (6).
(c) Install the washer (9), the nut (8) and the new cotter pin (7).
Subtask 27-26-00-710-052
B. Operational Test
(1) Remove the rigging pin (12) of the output bellcrank (10) of the yaw
damper.
(2) Remove the rigging pin (5) from the mixer (4) of the artificial feel
unit.
(3) Make sure that the pin (14) is disengaged from the input lever of the
transducer unit (15).
(4) On the maintenance panel 50VU:
- Push the HYD/LEAK MEASUREMENT VALVES/G and HYD/LEAK MEASUREMENT
VALVES/Y pushbutton switches (on these pushbutton switches, the OFF
legends go off).
(5) On the overhead panel 23VU, push the FLT CTL/FAC1 pushbutton switch
(on this pushbutton switch, the OFF legend goes off and the FAULT
legend comes on then goes off).
(6) Do the operational test of the yaw damper (Ref. TASK 22-63-00-710001).



EFF :
ALL
 27-26-00


R 
AIJ




Page 509
Nov 01/10

5. Close-up
________
Subtask 27-26-00-480-053
A. Not Applicable
Subtask 27-26-00-410-055
B. Close Access
(1) Close the access doors 325BL, 325BR.
(2) Install the protective cover on the battery power center 105VU.
(3) Tighten the two screws.
(4) Close the access door 822.
(5) Remove the access platform(s).
Subtask 27-26-00-860-056
C. Aircraft Maintenance Configuration
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
R
R

(2) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector
switch related to IR3 to OFF.

(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).

(4) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-26-00



AIJ




Page 510
Nov 01/10

TRANSDUCER UNIT - YAW DAMPER POSITION (2CC) - REMOVAL/INSTALLATION


__________________________________________________________________
TASK 27-26-17-000-001
Removal of the Yaw Damper Position Transducer Unit 2CC
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No
No
No
No

specific
specific
specific
specific

98D27207548000
98D27207549000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-26-17



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
55-33-13-010-002
R

27-26-17-991-001

De-energize the Aircraft Electrical Circuits Supplied


from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
Subtask 27-26-17-860-051
A. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(4) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.
(5) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.
(6) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(7) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-26-17



AIJ




Page 402
Feb 01/07

Subtask 27-26-17-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-17-860-050
C. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) De-energize the aircraft electrical circuits. (Ref. TASK 24-41-00862-002)
(3) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
Subtask 27-26-17-010-050
D. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access panels 325BL, 325BR at the trailing edge of the
vertical stabilizer (1) (Ref. TASK 55-33-13-010-002).
Subtask 27-26-17-480-050
E. Installation of the Rigging Pins

R
R
R

(1) Put the rigging pin (5) PIN-RIGGING (98D27207549000) in the bellcrank
of the yaw damper.

R
R
R

(2) Put the rigging pin (4) PIN-RIGGING (98D27207548000) in the bellcrank
of the rudder control unit.



EFF :
ALL
 27-26-17



AIJ




Page 403
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-26-17-991-001)


Subtask 27-26-17-020-050
A. Removal of the Yaw Damper Position Transducer Unit 2CC
(1) Disconnect the electrical connectors (18) from the plugs (19) on the
transducer unit 2CC (3).
NOTE : Do not disconnect the bonding jumpers (17) from the electrical
____
connectors (18) unless a repair or a new installation is
necessary.
(2) Put the blanking caps on the electrical connectors (18) and the plugs
(19).
(3) Disconnect the push-rod (13) from the transducer unit 2CC (3) as
follows:
(a) Remove and discard the cotter pin (9).
(b) Remove the nut (10), the washer (11) and the bolt (22) from the
connection of the transducer lever (12) and the push-rod (13).
(c) Move the push-rod (13) clear of the transducer lever (12).
(d) Remove the bush (21) from the transducer lever (12).
(4) Remove the transducer unit (3) from the support bracket (8) as
follows:
(a) Remove and discard the cotter pins (14).
(b) Support the transducer unit (3) and remove the nuts (15), the
washers (16) and the bolts (6) and (7).
NOTE : Identify the bolt (6) to make sure that it is installed in
____
the same position in the support bracket (8).
(c) Move the transducer unit 2CC (3) down and away from the support
bracket (8).



EFF :
ALL
 27-26-17



AIJ




Page 404
Feb 01/07

R
R

Position Transducer Unit 2CC


Figure 401/TASK 27-26-17-991-001



EFF :
ALL
 27-26-17



AIJ




Page 405
Feb 01/07

TASK 27-26-17-400-001
Installation of the Yaw Damper Position Transducer Unit 2CC
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R
R

98D27207548000
98D27207549000

warning notices
access platform 11.0 m (36 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING
1 PIN-RIGGING



EFF :
ALL
 27-26-17



AIJ




Page 406
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004
Material No. 05-005
Material No. 11-004

lockwire corrosion-resistant steel 0.8 mm (0.032


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------9
14

cotter pin
cotter pins

27-26-04 01 -100
27-26-04 01 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
29-00-00-864-001
51-75-13-916-002
55-33-13-010-002
55-33-13-410-002
R

27-26-17-991-001

Operational Test of the Yaw Damper Function


Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Repair to a layer of Corrosion Preventive Compound
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-26-17



AIJ




Page 407
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-26-17-991-001)
Subtask 27-26-17-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(7) Make sure that the access platform is in position.
(8) Make sure that the access panels 325BR, 325BL are open (Ref. TASK 5533-13-010-002).
R
R
R

(9) Make sure that the PIN - RIGGING (5) PIN-RIGGING (98D27207549000) is
in the bellcrank of the yaw damper

R
R

(10) Make sure that the PIN - RIGGING (4) PIN-RIGGING (98D27207548000) is
in the bellcrank of the rudder control unit.



EFF :
ALL
 27-26-17



AIJ




Page 408
Feb 01/11

Subtask 27-26-17-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-26-17-991-001)


Subtask 27-26-17-910-050
A. Preparation for the Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the paintwork and the structure of the vertical
stabilizer (1) and the rudder (2) are in the correct condition.
(2) Clean the interface of the support bracket (8) with CLEANING AGENTS
(Material No. 11-004) and let it dry.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Make sure that the bonding jumpers (17) are in the correct condition.
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Apply COMMON GREASE (Material No. 04-004) to the bush (21) and the
threads of the bolts (6),(7) and (22).



EFF :
ALL
 27-26-17



AIJ




Page 409
Feb 01/07

(7) Apply SPECIAL MATERIALS (Material No. 05-005) to the shafts of the
bolts (6),(7) and (22).
(8) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-005) to the
interface of the support bracket (8) and the the replacement
transducer unit (3) (Ref. TASK 51-75-13-916-002).
Subtask 27-26-17-420-050
B. Installation of the Yaw Damper Position Transducer Unit 2CC
(1) Install the transducer unit (3) at the support bracket (8) as
follows:
(a) Put the flange (20) in position at the support bracket (8) and
attach it with the bolts (6) and (7), the washers (16) and the
bolt (15).
(b) Tighten the nuts (15) and safety them with the new cotter pins
(14).
(2) Connect the push-rod (13) to the transducer unit (3) as follows:
(a) Install the bush (21) in the transducer lever (12).
(b) Put the push-rod (13) in position in the transducer lever (12)
and attach it wit the bolt (22), the washer (11) and the nut
(10).
(c) TORQUE the nut (10) to 0.8 m.daN (70.79 lbf.in) and safety it
with a new cotter pin (9).
R

(3) Remove the blanking caps from the electrical connector(s).


(4) Make sure that the electrical connectors are clean and in the correct
condition.
(5) Connect the electrical connectors (18) to the plugs (19).
NOTE : Make sure that the cables of the electrical connectors (18) do
____
not rub on the spar box of the vertical stabilizer (1).



EFF :
ALL
 27-26-17



AIJ




Page 410
Feb 01/11

Subtask 27-26-17-820-050
C. Adjustment Procedure
(Ref. Fig. 401/TASK 27-26-17-991-001)
(1) Make sure that the rigging pin (23) of the transducer (3) can be
installed and removed easily.
NOTE : The rigging pin (23) is part of the transducer.
____
(2) If you can not install the rigging pin (23) easily, adjust the length
of the push rod (13) as follows:
(a) Cut and remove the lockwire from the nuts (24).
(b) Loosen the nuts (24).
(c) Turn the rod body as required until you can install and remove
the rigging pin (23) easily.
(d) Tighten the nuts (24) and safety them with lockwire corrosionresistant steel 0.8 mm (0.032 in.).
(e) Make sure that the rigging pin (23) can be installed and removed
easily.
(f) Make sure that the rigging pin (23) is clear of the housing.
Subtask 27-26-17-080-050
D. Removal of the Rigging Pins
R
R
R

(1) Remove the rigging pin (4) PIN-RIGGING (98D27207548000) from the
bellcrank of the rudder control unit.

R
R
R

(2) Remove the rigging pin (5) PIN-RIGGING (98D27207549000) from the
bellcrank of the yaw damper.
Subtask 27-26-17-865-051
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2.



EFF :
ALL
 27-26-17



AIJ




Page 411
Feb 01/11

Subtask 27-26-17-710-050
F. Do an operational test of the yaw damper (Ref. TASK 22-63-00-710-001).
5. Close-up
________
Subtask 27-26-17-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL, 325BR at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-26-17


R 
AIJ




Page 412
Feb 01/07

CENTERING SPRING ROD - YAW DAMPER SERVO ACTUATOR - REMOVAL/INSTALLATION


_______________________________________________________________________
TASK 27-26-41-000-001
Removal of the Centering Spring Rod for the Actuator of the Yaw Damper Servo
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No specific
No specific
No specific

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE

98D27207549000

1 PIN-RIGGING



EFF :
ALL
 27-26-41



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-00-00-864-001
29-10-00-863-003
29-10-00-864-003
55-33-13-010-002
27-26-41-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
Subtask 27-26-41-860-051
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Blue hydraulic system with the electric pump.
(Ref. TASK 29-10-00-863-003)
(3) Put the rudder pedals in the neutral position
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Release the FLT CTL/FAC 1 pushbutton switch on the overhead panel
23VU and the OFF legend comes on.
(6) Release the FLT CTL/FAC 2 pushbutton switch on the overhead panel
24VU and the OFF legend comes on.
(7) Put the warning notices in the cockpit to tell persons not to operate
the flight controls.
(8) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-26-41


R 
AIJ




Page 402
Feb 01/11

Subtask 27-26-41-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-41-010-050
C. Get Access
R

(1) Put the ACCESS PLATFORM 12M (40 FT) - ADJUSTABLE in position.
(2) Open the access panel 325BL (Ref. TASK 55-33-13-010-002).
Subtask 27-26-41-860-050
D. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001)
(2) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
(3) Put the warning notices in position to tell persons not to operate
the hydraulic systems.

R
R
R

(4) Put the rigging pin PIN-RIGGING (98D27207549000) in the yaw damper
bellcrank.



EFF :
ALL
 27-26-41



AIJ




Page 403
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-26-41-991-001)


Subtask 27-26-41-020-050
A. Removal of the Centering Spring Rod
(1) Disconnect the spring rod (2) from the lever (3) as follows:
(a) Remove and discard the cotter pin (21).
(b) Remove the nut (20), the washer (19), the bush (5) and the bolt
(15).
(2) Disconnect the spring rod (2) from the lever arm (1) as follows:
(a) Remove and discard the cotter pin (10).
(b) Hold the spring rod (2) in position and remove the nut (9), the
washer (8), the bush (16) and the bolt (4).
(3) Move the spring rod (2) clear of the lever arm (1) and the lever (3).



EFF :
ALL
 27-26-41



AIJ




Page 404
Feb 01/07

R
R

Centering Spring Rod


Figure 401/TASK 27-26-41-991-001



EFF :
ALL
 27-26-41



AIJ




Page 405
Feb 01/07

TASK 27-26-41-400-001
Installation of the Centering Spring Rod for the Actuator of the Yaw Damper
Servo
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R

98D27207549000

warning notices
adjustable access platform 11.0 m (36 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING



EFF :
ALL
 27-26-41



AIJ




Page 406
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004
R

Material No. 05-002

lockwire, corrosion-resistant steel 0.8 mm (0.032


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-027


RUST INHIBITOR(FOR CORROSION USE 15-004)
(Ref. 20-31-00)
C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------10
21

cotter pin
cotter pin

27-26-04 01 -050
27-26-04 01 -050

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-24-00-710-001
29-00-00-864-001
55-33-13-010-002
55-33-13-410-002
27-26-41-991-001

Operational Test of the Rudder Hydraulic Actuation


Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-26-41



AIJ




Page 407
Feb 01/08

3. __________
Job Set-up
Subtask 27-26-41-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-41-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the rudder pedals are in the neutral position.
(4) Make sure that the RUD TRIM indicator on the panel 110VU of the
center pedestal shows zero.
(5) Make sure that the FLT CTL/FAC 1 pushbutton switch on the overhead
panel 23VU is released and the OFF legend is on.
(6) Make sure that the FLT CTL/FAC 2 pushbutton switch on the overhead
panel 24VU is released and the OFF legend is on.
(7) Make sure that the adjustable access platform is in position below
the access panel 325BL
(8) Make sure that the access panel 325BL is open (Ref. TASK 55-33-13010-002).
R
R

(9) Make sure that the rigging pin PIN-RIGGING (98D27207549000) is


installed in the bellcrank of the yaw damper.



EFF :
ALL
 27-26-41



AIJ




Page 408
Feb 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-26-41-991-001)
Subtask 27-26-41-910-050
A. Preparation for Installation
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(4),(15).
(5) Apply COMMON GREASE (Material No. 04-004) to the bushes (5),(16).
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the shafts of the
bolts (4) and (15).
Subtask 27-26-41-420-050
B. Installation of the Centering Spring Rod
CAUTION : YOU MUST INSTALL THE CENTERING SPRING ROD WITH THE LARGER
_______
SECTION UP. THIS WILL PREVENT DAMAGE TO THE CENTERING SPRING
ROD AND THE ARTIFICIAL FEEL SUPPORT.
(1) Connect the spring rod (2) to the lever arm (1) as follows:
(a) Put the bush (5) in the flanged bush (6) of the lever arm (1).
(b) Put the spring rod (2) in position in the lever (1) and attach it
with the bolt (4), the washer (8) and the nut (9).
(c) TORQUE the nut (9) to 0.7 m.daN (61.94 lbf.in) and safety it with
the cotter pin (10).



EFF :
ALL
 27-26-41


R 
AIJ




Page 409
May 01/11

(2) Adjust the length of the spring rod (2) as follows:


(a) If necessary, cut the lockwire and release the locknut (14).
(b) Turn the rod end until you can install the bolt (15) smoothly.
NOTE : Use lockwire and make sure that the inspection holes are
____
blocked by the threads of the rod end.
(c) Tighten the locknut (14) and safety it with the lockwire,
corrosion-resistant steel 0.8 mm (0.032 in.) on the safety
washers (13).
(3) Connect the spring rod (2) to the lever (3) as follows:
(a) Put the bush (16) in the flanged bush (17) of the lever (3).
(b) Put the spring rod (2) in position in the lever (3) and attach it
with the bolt (15), the washer (19) and the nut (20).
(c) TORQUE the nut (20) to 0.7 m.daN (61.94 lbf.in) and safety it
with the new cotter pin (21).
(4) Make sure that the locknut (12) is tight and safety with the
lockwire, corrosion-resistant steel 0.8 mm (0.032 in.) on the safety
washers (11).
Subtask 27-26-41-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2
Subtask 27-26-41-710-050
D. Test
R
R

(1) Remove the rigging pin 98D27207549000 from the yaw damper bellcrank.
(2) Remove the warning notice(s).
(3) Do the operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).



EFF :
ALL
 27-26-41



AIJ




Page 410
May 01/11

5. Close-up
________
Subtask 27-26-41-860-053
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Apply a layer of SPECIAL MATERIALS (Material No. 05-027) to the
adjacent structure.
(3) Make sure that the drain holes in the adjacent structure are not
blocked.
Subtask 27-26-41-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325BL (Ref. TASK 55-33-13-410-002).
(3) Remove the access platform(s).



EFF :
ALL
 27-26-41


R 
AIJ




Page 411
Feb 01/07

CENTERING SPRING ROD - YAW DAMPER SERVO ACTUATOR - INSPECTION/CHECK


___________________________________________________________________
R

TASK 27-26-41-280-001
Removal of the Centering Spring Rod of the Yaw Damper for Workshop Test
1. __________________
Reason for the Job
Refer to the MPD TASK: 272100-04
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-26-41-000-001
27-26-41-400-001
CMM

Removal of the Centering Spring Rod for the Actuator


of the Yaw Damper Servo
Installation of the Centering Spring Rod for the
Actuator of the Yaw Damper Servo

272641

3. __________
Job Set-up
Subtask 27-26-41-020-051
A. Remove the centering spring rod of the yaw damper (Ref. TASK 27-26-41000-001).
4. Procedure
_________
Subtask 27-26-41-280-050
A. Do a check of the centering spring rod of the yaw damper in the workshop
(Ref. CMM 272641).
5. Close-up
________
Subtask 27-26-41-420-051
A. Install the centering spring rod of the yaw damper (Ref. TASK 27-26-41400-001).



EFF :
ALL
 27-26-41



AIJ




Page 601
Feb 01/07

SERVO ACTUATOR - YAW DAMPER (3CC1,3CC2) - REMOVAL/INSTALLATION


______________________________________________________________
TASK 27-26-51-000-001
Removal of the Yaw Damper Servo Actuator (3CC1) and (3CC2)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

circuit breaker(s) safety clip(s)

No specific

warning notices

R
R
R
R

No specific
No specific
No specific
98D27207549000

1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


CAP - BLANKING
CONTAINER - HYDRAULIC FLUID RESISTANT
PIN-RIGGING



EFF :
ALL
 27-26-51



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
55-33-13-010-002
27-26-51-991-001

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-26-51-991-001)
Subtask 27-26-51-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access panel 325BL (for 3CC1) and/or 325BR (for 3CC2) at the
trailing edge of the vertical stabilizer (Ref. TASK 55-33-13-010002).
Subtask 27-26-51-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the rudder trim control is set at the zero position.
NOTE : Make sure that the trailing edge of the rudder is in line with
____
the red triangle on the tail cone.



EFF :
ALL
 27-26-51



AIJ




Page 402
Feb 01/11

R
R

Yaw Damper - Servo Actuator 3CC1, 3CC2


Figure 401/TASK 27-26-51-991-001



EFF :
ALL
 27-26-51



AIJ




Page 403
Feb 01/07

(4) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(5) Depressurize the Green and the Yellow hydraulic systems and put them
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Depressurize the reservoir of the Green and the Yellow hydraulic
system (Ref. TASK 29-14-00-614-001).
(8) Put the warning notices in position to tell persons not to operate
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
R
R
R

(9) Put the rigging pin PIN-RIGGING (98D27207549000) in the yaw damper
bellcrank.
Subtask 27-26-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-26-51-991-001)
Subtask 27-26-51-020-050
A. Removal of the Yaw Damper Servo Actuator 3CC1 and 3CC2
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.



EFF :
ALL
 27-26-51



AIJ




Page 404
Feb 01/11

NOTE : The procedure for the removal of the servo actuators 3CC1 (1) and
____
3CC2 (2) is the same.
(1) Disconnect the electrical connectors (12),(14) from the plugs on the
actuator (1),(2).
NOTE : Do not disconnect the bonding straps (13) from the electrical
____
connectors (12),(14) unless a repair or a new installation is
necessary.
R

(2) Put the CAP - BLANKING on the electrical connectors (12).(14) and the
plugs on the actuator (1),(2).
(3) Disconnect the hydraulic system from the actuator (1),(2).

(4) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the


connections of the hydraulic pipes (16),(19) to the actuator (1),(2).
(5) Disconnect the union nut (18) of the pipe (19) from the union (20) at
the pressure port of the actuator (1),(2).
(6) Disconnect the union nut (15) of the pipe (16) from the union (17) at
the return port of the actuator (1),(2).

R
R

(7) Drain the remaining hydraulic fluid into the CONTAINER - HYDRAULIC
FLUID RESISTANT.

R
R

(8) Put the CAP - BLANKING on the unions (17),(20) of the actuator
(1),(2).

(9) Put the CAP - BLANKING on the ends of the pipes (16),(19).
(10) Disconnect the actuator (1),(2) from the lever (11).
(a) Remove and discard the cotter pin (10).
(b) Remove the nut (9), the washer (8) and the bolt (3).
(c) Move the connection of the actuator (1),(2) away from the lever
(11).
(d) Remove the sliding bush (4) from the flanged bush (6) in the
lever (11).



EFF :
ALL
 27-26-51



AIJ




Page 405
May 01/11

(11) Disconnect the actuator (1),(2) from the lever (5).


(a) Support the actuator (1),(2).
(b) Remove and discard the cotter pin (10).
(c) Remove the nut (9), the washer (8) and the bolt (3).
(d) Move the connection of the actuator (1),(2) away from the lever
(5).
(e) Remove the actuator (1),(2).
(f) Remove the sliding bush (4) from the flanged bush (6) in the
lever (5).
NOTE : Do not remove the flanged bushes (6),(7) from the levers
____
(5),(11). The bushes (6),(7) are safetied in the levers
(5),(11) with loctite.



EFF :
ALL
 27-26-51



AIJ




Page 406
Feb 01/07

TASK 27-26-51-400-001
Installation of the Yaw Damper Servo Actuator (3CC1) and (3CC2)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

blanking caps

R
R
R

No
No
No
No

specific
specific
specific
specific

98D27207549000

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 PIN-RIGGING



EFF :
ALL
 27-26-51



AIJ




Page 407
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 04-004
Material No. 05-005
Material No. 08-029
Material No. 09-013
Material No. 16-021

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)

R
R

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
22-96-00-710-001
22-97-00-710-001
24-41-00-862-002
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
29-14-00-614-002
55-33-13-010-002
55-33-13-410-002
27-26-51-991-001

Operational Test of the Yaw Damper Function


Operational Test of the AFS
Operational Test of the LAND CAT III Capability
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401



EFF :
ALL
 27-26-51



AIJ




Page 408
May 01/11

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-26-51-991-001)
Subtask 27-26-51-860-054
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(3) Make sure that the access panel 325BL (for 3CC1) or 325BR (for 3CC2)
is open (Ref. TASK 55-33-13-010-002).
(4) Make sure that the rudder pedals are in the neutral position.
(5) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
R

(6) Make sure that the WARNING NOTICE(S) are in position in the cockpit
to tell persons not to operate the flight controls.
(7) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(8) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).

(9) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in


position below the hydraulic pipes of the actuator.
(10) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(11) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.



EFF :
ALL
 27-26-51



AIJ




Page 409
May 01/11

(12) Make sure that the PIN - RIGGING PIN-RIGGING (98D27207549000) is in


position in the yaw damper bellcrank.
Subtask 27-26-51-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-26-51-210-050
C. Visual inspection of the work area and the attachment components
(1) Inspection of the work area.
(a) Make sure that these areas and items are clean, show no corrosion
and are not damaged:
- The structure
- The paintwork
- The levers (5) and (11)
- The electrical connectors (12) and (14)
- The bonding straps (13)
- The union nuts (15) and (18)
- The hydraulic pipes (16) and (19).
(2) Inspection of the attachment components.
(a) Make sure that these items are clean and in good condition:
- The bolts (3)
- The bushes (4),(6) and (7)
- The nuts (9).
(b) Make sure that the bushes (6) and (7) are tight in the levers (5)
and (11).



EFF :
ALL
 27-26-51


R 
AIJ




Page 410
May 01/11

(c) If the bushes (6) and (7) are not tight in the levers (5) and
(11):
1
_

Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029) to


the bushes (6) and (7) to safety them in the levers (5) and
(11).

2
_

Seal the bushes (6) and (7) in the levers (5) and (11) with
SEALANTS (Material No. 09-013).

3
_

Apply STRUCTURE PAINTS (Material No. 16-021) over the bushes


(6) and (7) to protect them.

4. Procedure
_________
(Ref. Fig. 401/TASK 27-26-51-991-001)
Subtask 27-26-51-910-051
A. Preparation for Installation
(1) Apply COMMON GREASE (Material No. 04-004) to the thread of the bolts
(3) and to the interfaces of the bushes (4),(6),(7).
(2) Apply SPECIAL MATERIALS (Material No. 05-005) to the shafts of the
bolts (3).
Subtask 27-26-51-420-050
B. Installation of the Yaw Damper Servo Actuator 3CC1 and 3CC2
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
(1) Connect the actuator (1),(2) to the lever (5).
(a) Support the actuator (1),(2).
(b) Put the sliding bush (4) into the flanged bush (6) of the lever
(5).



EFF :
ALL
 27-26-51


R 
AIJ




Page 411
May 01/11

(c) Put the connection of the actuator (1),(2) in position in the


lever (5).
(d) Install the bolt (3), the washer (8) and the nut (9) at the
connection of the lever (5) and the actuator (1),(2).
(2) Connect the actuator (1),(2) to the lever (11).
(a) Put the sliding bush (4) into the flanged bush (6) in the lever
(11).
(b) Put the connection of the actuator (1),(2) in position in the
lever (11).
(c) Install the bolt (3), the washer (8) and the nut (9) at the
connection of the lever (11) and the actuator (1),(2).
(3) TORQUE the nuts (9) to 1.5 m.daN (11.06 lbf.ft) and then loosen the
nuts (9) to the next cotter pin hole.
(4) Safety the nuts (9) with new cotter pins (10).
(5) Remove the blanking caps from the unions (17),(20) of the actuator
(1),(2).
(6) Remove the blanking caps from the ends of the pipes (16),(19).
(7) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the
line end-fittings.
(8) Connect the union nut (18) of the pipe (19) to the union (20) at the
pressure port of the actuator (1),(2).
(9) Connect the union nut (15) of the pipe (16) to the union (17) at the
return port of the actuator (1),(2).
NOTE : Make sure that the pipes (16),(19) do not rub on the
____
structure.
(10) TORQUE the union nut (18) to between 1.5 and 1.7 m.daN (11.06 and
12.53 lbf.ft).
(11) TORQUE the union nut (15) to between 2.0 and 2.3 m.daN (14.74 and
16.96 lbf.ft).
(12) Remove the drainage container.



EFF :
ALL
 27-26-51


R 
AIJ




Page 412
May 01/11

(13) Remove all signs of hydraulic fluid from the components and the work
area.
(14) Remove the blanking caps from the electrical connector (12),(14) and
the plugs on the actuator (1),(2).
(15) Connect the electrical connectors (12),(14) to the actuator (1),(2).
Subtask 27-26-51-865-051
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2.
Subtask 27-26-51-080-050
D. Preparation for the Test
(1) Pressurize the reservoir of the Green and the Yellow hydraulic system
(Ref. TASK 29-14-00-614-002).
(2) Remove the rigging pin PIN-RIGGING (98D27207549000) from the yaw
damper bellcrank.
Subtask 27-26-51-710-050
E. Test
(1) Do an operational test of the yaw damper (Ref. TASK 22-63-00-710001).
NOTE : If you operate the aircraft in actual CAT 3 conditions, do
____
these tests:
- AFS-Test (Ref. TASK 22-96-00-710-001) and Land-Test
(Ref. TASK 22-97-00-710-001).
(2) Do a visual check and make sure that there are no hydraulic leaks at
the yaw damper.



EFF :
ALL
 27-26-51


R 
AIJ




Page 413
May 01/11

5. Close-up
________
Subtask 27-26-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panel 325BL (for 3CC1) and/or 325BR (for 3CC2) at
the trailing edge of the vertical stabilizer (Ref. TASK 55-33-13-410002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-26-51


R 
AIJ




Page 414
Feb 01/07

TASK 27-26-51-000-002
Removal of the Servovalve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


warning notices
container 3.0 l (0.7925 USgal)
adjustable platform 6.0 m (19 ft. 8 in.)

R
98D27207549000

1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
55-33-13-010-002
27-26-51-991-001
27-26-51-991-002

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 401
Fig. 402



EFF :
ALL
 27-26-51



AIJ




Page 415
Feb 01/11

3. __________
Job Set-up
Subtask 27-26-51-860-058
A. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(3) Depressurize the Green and the Yellow hydraulic systems and put them
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Green and the Yellow hydraulic
system (Ref. TASK 29-14-00-614-001).
(6) Put the warning notices in position to tell persons not to operate
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(7) Put a container below the yaw damper.
R
R
R

(8) Put the rigging pin PIN-RIGGING (98D27207549000) in the yaw damper
bellcrank.
(Ref. Fig. 401/TASK 27-26-51-991-001)



EFF :
ALL
 27-26-51



AIJ




Page 416
Feb 01/11

Subtask 27-26-51-010-051
B. Get Access
(1) Put the adjustable platform in position.
(2) Open the access panels 325BL (for the servovalve on 3CC1) and/or
325BR (for the servovalve on 3CC2) at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-010-002).
Subtask 27-26-51-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 402/TASK 27-26-51-991-002)
Subtask 27-26-51-020-051
A. Removal of the Servovalve
(1) Cut and remove the lockwire which safeties the screws (12).
(2) Remove the screws (12) and the washers (11).
(3) Pull the servovalve (13) away from the yaw damper (7).
(4) Remove and discard the base plate (10).
R

(5) Remove and discard and the O-ring (14).



EFF :
ALL
 27-26-51



AIJ




Page 417
May 01/10

Servovalve and Solenoid Valve


Figure 402/TASK 27-26-51-991-002



EFF :
ALL
 27-26-51



AIJ




Page 418
May 01/10

TASK 27-26-51-400-002
Installation of the Servovalve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27207549000

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING



EFF :
ALL
 27-26-51



AIJ




Page 419
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
Material No. 05-002

lockwire, corrosion-resistant steel, dia. 0.8 mm


(0.032 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

R
R

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
29-14-00-614-002
55-33-13-010-002
55-33-13-410-002
27-26-51-991-001
27-26-51-991-002

Operational Test of the Yaw Damper Function


Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-26-51-860-055
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).



EFF :
ALL
 27-26-51



AIJ




Page 420
May 01/11

(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(3) Make sure that the access panel 325BL (for the servovalve on 3CC1) or
325BR (for the servovalve on 3CC2) is open (Ref. TASK 55-33-13-010002).
(4) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.

(7) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in


position below the yaw damper.

(8) Make sure that the rigging pin PIN-RIGGING is in position in the yaw
damper bellcrank.
(Ref. Fig. 401/TASK 27-26-51-991-001)
Subtask 27-26-51-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-26-51



AIJ




Page 421
May 01/11

4. Procedure
_________
Subtask 27-26-51-420-051
A. Installation of the Servovalve
(Ref. Fig. 402/TASK 27-26-51-991-002)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply the anti-corrosion compound SPECIAL MATERIALS (Material No. 05002) to the threads of the screws (12).
(5) Lubricate the new O-ring (14) with HYDRAULIC FLUIDS (Material No. 02003).
(6) Install the O-ring (14) in the port of the servovalve (13).
(7) Put the new base plate (10) in its installation position on the yaw
damper (7).
NOTE : Do not lubricate the base plate. It must be clean and dry.
____
(8) Put the servovalve (13) on the base plate (10) and align the holes.
(9) Install the screws (12) with the washers (11) on the servovalve (13)
and the yaw damper (7).
(10) TORQUE the screws (12) to 0.6 m.daN (53.09 lbf.in).
(11) Safety the screws (12) with lockwire, corrosion-resistant steel, dia.
0.8 mm (0.032 in.).



EFF :
ALL
 27-26-51


R 
AIJ




Page 422
May 01/11

Subtask 27-26-51-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2
Subtask 27-26-51-080-051
C. Preparation for the Test
(1) Remove the rigging pin PIN-RIGGING (98D27207549000) from the yaw
damper bellcrank.
(2) Remove the container.
(3) Pressurize the reservoir of the Green and the Yellow hydraulic system
(Ref. TASK 29-14-00-614-002).
Subtask 27-26-51-710-051
D. Test
(1) Do an operational test of the yaw damper (Ref. TASK 22-63-00-710001).
(2) Do a visual check and make sure that there are no hydraulic leaks at
the yaw damper.
5. Close-up
________
Subtask 27-26-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL (for the servovalve on 3CC1) and/or
325BR (for the servovalve on 3CC2) at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-26-51


R 
AIJ




Page 423
May 01/11

INTENTIONALLY BLANK



R

 27-26-51



AIJ




Page 424
May 01/11

TASK 27-26-51-000-003
Removal of the Solenoid Valve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


warning notices
container 3.0 l (0.7925 USgal)
adjustable platform 6.0 m (19 ft. 8 in.)

R
98D27207549000

1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
55-33-13-010-002
27-26-51-991-002

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 402



EFF :
ALL
 27-26-51



AIJ




Page 425
Feb 01/11

3. __________
Job Set-up
Subtask 27-26-51-010-053
A. Get Access
(1) Put the adjustable platform in position.
(2) Open the access panels 325BL (for the solenoid valve on 3CC1) and/or
325BR (for the solenoid valve on 3CC2) at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-010-002).
Subtask 27-26-51-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the rudder trim control is set at the zero position.
NOTE : Make sure that the trailing edge of the rudder is in line with
____
the red triangle on the tail cone.
(4) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(5) Depressurize the Green and the Yellow hydraulic systems and put them
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Depressurize the reservoir of the Green and the Yellow hydraulic
system (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-26-51


R 
AIJ




Page 426
Feb 01/07

(8) Put the warning notices in position to tell persons not to operate
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(9) Put a container below the yaw damper to collect the unwanted fluid.
(10) Put the rigging pin PIN-RIGGING (98D27207549000) in the yaw damper
bellcrank.
Subtask 27-26-51-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 402/TASK 27-26-51-991-002)
Subtask 27-26-51-020-052
A. Removal of the Solenoid Valve
(1) Cut and remove the lockwire which safeties the screws (1).
(2) Remove the screws (1) with the washers (2).
(3) Remove the solenoid valve (3) from the yaw damper (7).
(4) Remove and discard the O-rings (4),(5),(6).
(5) Remove and discard the lock washer (8) and the O-ring (9).



EFF :
ALL
 27-26-51


R 
AIJ




Page 427
May 01/11

TASK 27-26-51-400-003
Installation of the Solenoid Valve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27207549000

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING



EFF :
ALL
 27-26-51



AIJ




Page 428
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
Material No. 05-002

lockwire, corrosion-resistant steel, dia. 0.8 mm


(0.032 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

R
R

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
24-41-00-862-002
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
29-14-00-614-002
55-33-13-010-002
55-33-13-410-002
27-26-51-991-002

Operational Test of the Yaw Damper Function


De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 402

3. __________
Job Set-up
Subtask 27-26-51-860-056
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).



EFF :
ALL
 27-26-51



AIJ




Page 429
May 01/11

(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(3) Make sure that the access panel 325BL (for the solenoid valve on
3CC1) or 325BR (for the solenoid valve on 3CC2) is open (Ref. TASK
55-33-13-010-002).
(4) Make sure that the rudder pedals are in the neutral position.
(5) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
(6) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the flight controls.
(7) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(8) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
(9) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
R

(10) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(11) Make sure that the PIN - RIGGING PIN-RIGGING (98D27207549000) is in
position in the yaw damper bellcrank.

(12) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in


position below the yaw damper to collect unwanted fluid.



EFF :
ALL
 27-26-51



AIJ




Page 430
May 01/11

Subtask 27-26-51-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 402/TASK 27-26-51-991-002)
Subtask 27-26-51-420-052
A. Installation of the Solenoid Valve
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
screws (1).
(5) Lubricate the new O-ring (4), O-ring (5), O-ring (6) and O-ring (9)
with HYDRAULIC FLUIDS (Material No. 02-003).
(6) Put the O-rings (4),(5),(6) on the applicable port of the solenoid
valve (3).



EFF :
ALL
 27-26-51


R 
AIJ




Page 431
Feb 01/11

(7) Put the O-ring (9) and the lock washer (8) on the applicable port of
the solenoid valve (3).
(8) Put the solenoid valve (3) into its installation position on the yaw
damper (7).
(9) Install the screws (1) with the washers (2) to the solenoid valve (3)
and the yaw damper (7).
(10) TORQUE the screws (1) to 0.2 m.daN (17.69 lbf.in).
(11) Safety the screws (1) with lockwire, corrosion-resistant steel, dia.
0.8 mm (0.032 in.).
Subtask 27-26-51-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2
Subtask 27-26-51-080-052
C. Preparation for the Test
R
R
R

(1) Remove the rigging pin PIN-RIGGING (98D27207549000) from the yaw
damper bellcrank.
(2) Remove the container.
(3) Pressurize the reservoir of the Green and the Yellow hydraulic system
(Ref. TASK 29-14-00-614-002).
Subtask 27-26-51-710-052
D. Test
(1) Do an operational test of the yaw damper (Ref. TASK 22-63-00-710001).
(2) Do a visual check and make sure that there are no hydraulic leaks at
the yaw damper.



EFF :
ALL
 27-26-51



AIJ




Page 432
Feb 01/11

5. Close-up
________
Subtask 27-26-51-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL (for the solenoid valve on 3CC1) and/or
325BR (for the solenoid valve on 3CC2) at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-26-51


R 
AIJ




Page 433
Feb 01/07

TASK 27-26-51-000-004
Removal of the Pressure Switch
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


warning notices
container 3.0 l (0.7925 USgal)
adjustable platform 6.0 m (19 ft. 8 in.)

R
98D27207549000

1 PIN-RIGGING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
55-33-13-010-002
27-26-51-991-003

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Fig. 403



EFF :
ALL
 27-26-51



AIJ




Page 434
Feb 01/11

3. __________
Job Set-up
Subtask 27-26-51-010-055
A. Get Access
(1) Put the adjustable platform in position.
(2) Open the access panels 325BL (for the pressure switch on 3CC1) and/or
325BR (for the pressure switch on 3CC2) at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-010-002).
Subtask 27-26-51-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Put the rudder pedals in the neutral position.
(3) Make sure that the rudder trim control is set at the zero position.
NOTE : Make sure that the trailing edge of the rudder is in line with
____
the red triangle on the tail cone.
(4) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(5) Depressurize the Green and the Yellow hydraulic systems and put them
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(6) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(7) Depressurize the reservoir of the Green and the Yellow hydraulic
system (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-26-51


R 
AIJ




Page 435
Feb 01/07

(8) Put the warning notices in position to tell persons not to operate
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU on the overhead panel,
- on the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
(9) Put a container below the yaw damper to collect the unwanted fluid.
R
R
R

(10) Put the rigging pin PIN-RIGGING (98D27207549000) in the yaw damper
bellcrank.
Subtask 27-26-51-865-059
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 403/TASK 27-26-51-991-003)
Subtask 27-26-51-020-053
A. Removal of the Pressure Switch
(1) Cut and remove the lockwire which safeties the screws (7).
(2) Remove the screws (7) and the washers (6).
(3) Pull the pressure switch (5) off the yaw damper (8).
(4) Remove and discard the O-ring (1) from the port.
(5) Remove and discard the extrusion rings (2),(4) and the O-ring (3)
from the port.



EFF :
ALL
 27-26-51



AIJ




Page 436
Feb 01/11

R
R

Pressure Switch
Figure 403/TASK 27-26-51-991-003



EFF :
ALL
 27-26-51



AIJ




Page 437
Feb 01/07

TASK 27-26-51-400-004
Installation of the Pressure Switch
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific
98D27207549000

1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


CONTAINER - HYDRAULIC FLUID RESISTANT
WARNING NOTICE(S)
PIN-RIGGING



EFF :
ALL
 27-26-51



AIJ




Page 438
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
Material No. 05-002

lockwire, corrosion-resistant steel, dia. 0.8 mm


(0.032 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

R
R

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-63-00-710-001
24-41-00-862-002
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
29-14-00-614-002
55-33-13-010-002
55-33-13-410-002
27-26-51-991-003

Operational Test of the Yaw Damper Function


De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 403

3. __________
Job Set-up
Subtask 27-26-51-860-057
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).



EFF :
ALL
 27-26-51



AIJ




Page 439
May 01/11

(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position at zone 325.
(3) Make sure that the access panel 325BL (for the pressure switch on
3CC1) or 325BR (for the pressure switch on 3CC2) is open (Ref. TASK
55-33-13-010-002).
(4) Make sure that the rudder pedals are in the neutral position.
(5) Make sure that the RUD TRIM indicator on the center pedestal, on the
panel 110VU shows 0.
R

(6) Make sure that the WARNING NOTICE(S) are in position in the cockpit
to tell persons not to operate the flight controls.
(7) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(8) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
(9) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(10) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.
(11) Make sure that the PIN - RIGGING PIN-RIGGING (98D27207549000) is in
position in the yaw damper bellcrank.

(12) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in


position below the yaw damper to collect unwanted fluid.



EFF :
ALL
 27-26-51



AIJ




Page 440
May 01/11

Subtask 27-26-51-865-060
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 403/TASK 27-26-51-991-003)
Subtask 27-26-51-420-053
A. Installation of the Pressure Switch
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Clean the component interface and/or the adjacent area.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
screws (7).
(5) Lubricate the new O-ring (1) and O-ring (3) with HYDRAULIC FLUIDS
(Material No. 02-003).
(6) Put the O-ring (1) on the applicable port of the pressure switch (5).



EFF :
ALL
 27-26-51


R 
AIJ




Page 441
Feb 01/11

(7) Put the new extrusion ring (2), extrusion ring (4) and the O-ring (3)
on the applicable port of the pressure switch (5).
(8) Put the pressure switch (5) into its installation position on the yaw
damper (8).
(9) Install the screws (7) with the washers (6) in the pressure switch
(5) and tighten the screws.
(10) Safety the screws (7) with lockwire, corrosion-resistant steel, dia.
0.8 mm (0.032 in.).
Subtask 27-26-51-865-061
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CC1, 5CC2, 14CC1, 14CC2.
Subtask 27-26-51-080-053
C. Preparation for the Test
R
R
R

(1) Remove the rigging pin PIN-RIGGING (98D27207549000) from the yaw
damper bellcrank.
(2) Remove the container.
(3) Pressurize the reservoir of the Green and the Yellow hydraulic system
(Ref. TASK 29-14-00-614-002).
Subtask 27-26-51-710-053
D. Test
(1) Do an operational test of the yaw damper (Ref. TASK 22-63-00-710001).
(2) Do a visual check and make sure that there are no hydraulic leaks at
the yaw damper.



EFF :
ALL
 27-26-51



AIJ




Page 442
Feb 01/11

5. Close-up
________
Subtask 27-26-51-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access panels 325BL (for the pressure switch on 3CC1)
and/or 325BR (for the pressure switch on 3CC2) at the trailing edge
of the vertical stabilizer (Ref. TASK 55-33-13-410-002).
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-26-51


R 
AIJ




Page 443
Feb 01/07

SERVO ACTUATOR - YAW DAMPER (3CC1,3CC2) - INSPECTION/CHECK


__________________________________________________________
TASK 27-26-51-200-001
Visual Inspection of the Yaw Damper Servo-Actuators
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 272651-01
NOTE : The inspection procedure that follows is only applicable if a yaw
____
damper servo-actuator with the part number SC4700-3 is installed.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
98D27207548000

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-26-51



AIJ




Page 601
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-26-51-000-001
27-26-51-400-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
31-32-00-860-010
31-60-00-860-001
31-60-00-860-002
34-14-00-740-001
55-33-13-010-002
55-33-13-410-002
27-26-51-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Yaw Damper Servo Actuator (3CC1) and
(3CC2)
Installation of the Yaw Damper Servo Actuator (3CC1)
and (3CC2)
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Procedure to Get Access to the SYSTEM REPORT/TEST NAV
Page
EIS Start Procedure
EIS Stop Procedure
Interface Test of the IR
Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
Fig. 601

3. __________
Job Set-up
Subtask 27-26-51-010-057
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access panel 325BL and 325BR at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-010-002).



EFF :
ALL
 27-26-51



AIJ




Page 602
Feb 01/11

Subtask 27-26-51-860-060
B. Cleaning and Visual Inspection
(1) Clean the yaw damper servo actuators and the adjacent area with a
lint-free cotton cloth MISCELLANEOUS (Material No. 19-003) and
CLEANING AGENTS (Material No. 11-026).
(2) Examine the yaw damper servo actuators and the adjacent area for:
- damage
- corrosion
- satisfactory surface protection.
Subtask 27-26-51-860-059
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Do the EIS start procedure (ECAM system only) (Ref. TASK 31-60-00860-001).
(3) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-10-00-863-003).
(4) On the center pedestal, on the ECAM control panel:
- Get the F/CTL page.
(5) On the overhead panel, on the ADIRS CDU:
- Set the OFF/NAV/ATT selector switch related to IR3 to NAV.
- Make sure that the OFF/NAV/ATT selector switches related to IR1 and
IR2 are in the OFF position.
(6) On the overhead panel, on the FLT CTL panels 23VU and 24VU:
- Make sure that the FAC1 and the FAC2 pushbutton switches are pushed
(the FAULT and OFF legends are off).
(7) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(8) Put the warning notices in position to tell persons not to operate
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.



EFF :
ALL
 27-26-51



AIJ




Page 603
Aug 01/07

Subtask 27-26-51-865-062
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
(Ref. Fig. 601/TASK 27-26-51-991-004)
Subtask 27-26-51-710-054
A. Check for the External Leakage of the Yaw Damper Servo Actuator
NOTE : This procedure is for the Green hydraulic system. For the Yellow
____
hydraulic system, use the indications between the parentheses.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the FLT CTL panel 24VU(23VU):
- Release the FAC2(FAC1)
pushbutton switch.

- On this pushbutton switch, the OFF


legend comes on.

2. On the center pedestal, on the


MCDU2 (or on the L side console,
on the MCDU3):
- Get the SYSTEM REPORT/TEST NAV
page (Ref. TASK 31-32-00-860010).
- Push the line key adjacent to
the IR3 indication.

The IR3 page comes into view.

- Get acess to the INTERFACE TEST


of the IR3 (Ref. TASK 34-14-00740-001).



EFF :
ALL
 27-26-51



AIJ




Page 604
Feb 01/11

Servo Actuator - Yaw Damper (3CC1,3CC2)


Figure 601/TASK 27-26-51-991-004


EFF :
ALL
 27-26-51



AIJ




Page 605
Aug 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------NOTE : For the test below, ignore
____
the warnings and the
attitude changes.
3. Push the line key adjacent to the
START TEST indication.

- The rudder moves to the left, then


slowly moves back to zero.

4. Push the line key adjacent to the


RETURN (TEST STOP) indication.

- The rudder moves to the right, then


slowly moves back to zero.

5. On the MCDU2 (or 3):


- Push the the line key adjacent
to the RETURN indication until
the CFDS menu page comes into
view.

On the MCDU2 (or 3):


- The CFDS MENU page comes into view.

6. On the FLT CTL panel 24VU(23VU):


- Push the FAC2(FAC1) pushbutton
switch.
R

- On this pushbutton switch, the OFF


legend goes off.

(1) Put the PIN-RIGGING (98D27207548000) (1) in the bellcrank of the


rudder control unit.
(2) Do a visual check of the yaw damper servo actuators for external
leakages.
Subtask 27-26-51-210-058
B. Leakage Rates
(1) If the leakage rate is less than 4 drops per minute, no further
action is necessary.

R
(2) If the leakage rate is between 4 and 14 drops drops per minute,
replace the yaw damper servo actuator(s) before the next 600 flight
hours (Ref. TASK 27-26-51-000-001) and (Ref. TASK 27-26-51-400-001).
(3) If the leakage rate is between 15 and 30 drops drops per minute,
replace the yawdamper servo actuator(s) before the next 100 flight
hours (Ref. TASK 27-26-51-000-001) and (Ref. TASK 27-26-51-400-001).



EFF :
ALL
 27-26-51



AIJ




Page 606
Nov 01/10

(4) If the leakage rate is more than 30 drops per minute, replace the yaw
damper servo actuator(s) immediately (Ref. TASK 27-26-51-000-001) and
(Ref. TASK 27-26-51-400-001).
5. Close-up
________
Subtask 27-26-51-410-054
A. Put the aircraft back to the serviceable condition.
(1) On the overhead panel, on the ADIRS CDU:
- Set the OFF/NAV/ATT selector switch related to IR3 to OFF.
(2) Do the EIS stop procedure (ECAM system only) (Ref. TASK 31-60-00-860002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(4) Remove the rigging pin (1) from the bellcrank of the rudder control
unit.
(5) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) and (Ref. TASK 29-10-00-864-003).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.
(7) Close the access panel 325BL and 325BR at the trailing edge of the
vertical stabilizer (Ref. TASK 55-33-13-410-002).
(8) Remove the warning notice(s).
(9) Remove the access platform(s).



EFF :
ALL
 27-26-51



AIJ




Page 607
Aug 01/07

ELEVATOR - DESCRIPTION AND OPERATION


____________________________________
1. _______
General
(Ref. Fig. 001)
two elevators hinged on the trimmable horizontal stabilizer (THS) ensure the
pitch control (Ref. 27-40).
The elevators are controlled by :
- the Elevator and Aileron Computers (ELAC : Ref. 27-93) in the normal mode
- the Spoiler and Elevator Computers (SEC : Ref. 27-94) in case of ELAC
failure.
The control orders are computed from signals that the two
electrically-coupled side stick controllers send.
The artificial feel system (Ref. 27-92) operates independently of the flight
conditions.
Two electrohydraulic servocontrols (Ref. 27-34) hydraulically actuate each
elevator.
The position of the elevators is shown on the lower display unit of the ECAM
system via the Flight Control Data Concentrator (FCDC : Ref. 27-95).
On ground, with hydraulic systems not pressurized, the elevators may or may
not droop down to the servocontrol stop depending on the scatter of bearing
and seal friction.
2. Interface
________________________________________________
with the Autopilot System (Ref. 22-70)
In the AP mode, the ELACs receive the FMGC orders and transfer them to the
servocontrols.
The pilots can cancel the automatic mode through the override of a
disengagement system, installed on each side stick controller.
The disengagement system includes a spring device and a solenoid energized
by the FMGCs.



EFF :
ALL
 27-30-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-30-00



AIJ




Page 2
Feb 01/07

Elevator
Figure 001

EFF :
ALL
 27-30-00




AIJ




Page 3/4
Feb 01/07

ELEVATOR AND HYDRAULIC ACTUATION - DESCRIPTION AND OPERATION


____________________________________________________________
1. _______
General
Two electrohydraulic servocontrols hydraulically actuate each elevator.
2. Component
__________________
Location
(Ref. Fig. 001)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------34CE1
SERVO CTL-L ELEVATOR, INBD G
335 334DB
27-34-51
34CE2
SERVO CTL-R ELEVATOR, INBD Y
345 344DB
27-34-51
34CE3
SERVO CTL-L ELEVATOR, OUTBD B
335 334DB
27-34-51
34CE4
SERVO CTL-R ELEVATOR, OUTBD B
345 344DB
27-34-51



EFF :
ALL
 27-34-00



AIJ




Page 1
Feb 01/07

Location of Elevator Servocontrol


Figure 001


EFF :
ALL
 27-34-00



AIJ




Page 2
Feb 01/07

3. _____________________
Component Description
A. Elevator Servocontrol
(Ref. Fig. 002)
(1) General
Each elevator is equipped with two interchangeable fixed-body
electrically-controlled servo controls.
Each servo control is connected to two ELACs and to two SECs.
NOTE: vibrations could occur in the following configuration:
- vibrations along the cabin and in the cockpit and
- elevator control with SECs active and ELACs not active,
No trouble shooting is necesary (elevator oscillations are wider in
SEC mode than ELAC mode).
Each elevator is actuated by a servo control in the active mode,
while the other is in the damping mode.
the active computer achieves the closed loop control of one servo
control and commands the damping mode on the adjacent servo
control.
(Ref. Fig. 003)
In the normal configuration, the inboard servo control is in the
active mode.
4. Operation
_________
A. General
Each servo control has three operating modes:
- the active mode which permits the actuation of the elevator depending
on electrical orders,
- the damping mode which prevents the appearance of flutter in the event
of multiple failures (mainly dual hydraulic or electrical failures,
disconnection of one servocontrol associated to the hydraulic or
electrical failure of the other servo control),
- the centering mode which permits to bring back and hold the elevator in
the 0 position in the event of a loss of the electrical control of the
two servo controls of a surface.
B. Normal operation with the servocontrol pressurized.
The pressurization of the servocontrol involves the opening of the
pressure-line closing valve (2) and of the return-line closing valve (3).
Thus, the servovalve (4) is supplied from the HP system and the return
system of the servocontrol is connected to the LP system.



EFF :
ALL
 27-34-00


R 
AIJ




Page 3
Feb 01/07

Elevator Servocontrol
Figure 002


EFF :
ALL
 27-34-00



AIJ




Page 4
Feb 01/07

Elevator Servocontrols - Damping and Active controls


Figure 003


EFF :
ALL
 27-34-00



AIJ




Page 5
Feb 01/07

(1) Servocontrol in the active mode.


In this case, the two solenoid valves (1) are de-energized and let
out the HP flow which sets the mode selector valve (5) in the active
mode.
Thus, the two actuator chambers are connected to the servovalve
control line and the servovalve passes in the active mode.
The mode selector-valve transducer (11) supplies an electrical signal
which identifies this change of state.
One of the two feedback transducers (10) gives the servoloop
feedback. The other is in standby and used in case of failure.
NOTE : If three feedback transducers are installed, the third is not
____
used.
The elevator position transducer-unit is used for the
monitoring.
The servovalve transducer (12) is also used for the
monitoring.
(2) Servocontrol in the damping mode.
One solenoid valve at least is energized and the mode selector is
displaced in the damping mode under the action of its spring.
This causes the interconnection of the two actuator chambers through
the damping orifice (6).
The mode selector-valve transducer identifies this change of state.
The check valve (7) and the fluid reserve (9) hold the volume of
fluid in the actuator chambers :
- if the temperature of the hydraulic fluid changes,
- if there is a leakage.
The return relief valve (8) increases the pressure in the return line
and permits to fill the reserve of fluid.
(3) Servocontrol in the centering mode.
With the solenoid valves and servovalve de-energized the servovalve
control valve is centered to the neutral position by its mechanical
input.
The mechanical input is always positioned by the linkage (13) so as
to give a control order opposed to the preceding electrical control
order.
Thus the servocontrol goes back and stays in the zero position.
(4) Differential pressure indicator
The purpose of differential pressure indicator (16) is to check the
return relief valve (8). It controls:
- that the return relief valve provides a differential pressure
greater or equal to 4 +0.5 -0.5 bar (58.0150 +7.2518 -7.2518 psi).



EFF :
ALL
 27-34-00



AIJ




Page 6
Feb 01/07

- that the return relief valve does not stick in the open position.
- that the return relief valve closes properly.
C. Operation after a simple electrical failure.
In this case, the solenoid valve is energized and the servocontrol
operates in the damping mode (Ref. para. (2) (b)).
D. Operation after a total electrical failure.
In this case, the solenoid valves and the servovalves are de-energized
and the servocontrol operates in the centering mode (Ref. para. (2) (c)).
E. Operation after a hydraulic failure.
The closing valves (2) and (3) close and isolate the servocontrol from
the aircraft hydraulic system.
If there is a rupture of the aircraft return line, the return reliefvalve holds the fluid volume in the fluid reserve. The mode selectorvalve is set to the damping mode under the action of its spring.
Thus, the servocontrol operates in the damping mode.
F. Special case
After hydraulic
between the two
This is because
servo control.
This difference

depressurization, a difference in droop speed and travel


elevators is possible.
of the variations of friction in the attachments and the
is correct.

G. Maintenance and rigging facilities.


The maintenance is on condition.
The items given below are Line Replaceable Units:
- Filter
- Mode selector-valve transducer
- Solenoid valves
- Servovalve
- Actuator eye-end.
To replace the servocontrol, it is necessary to have simultaneously the
surface and the servocontrol in the neutral position.
This is done through the adjustment of the rod eye-end length.
H. Particular points.
During flight, vibrations may occur with the current elevator neutral
setting combined with backlash at the elevator servo control attachments.
To avoid this situation, the elevator zero position is shifted 0.5 deg
nose-up, trailing edge upwards.



EFF :
ALL
 27-34-00


R 
AIJ




Page 7
Feb 01/07

ELEVATOR AND HYDRAULIC ACTUATION - DEACTIVATION/REACTIVATION


____________________________________________________________
TASK 27-34-00-040-001
Elevator Servocontrol Position-Transducer - Connection of the Spare Transducer
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-34-02-A)
Elevator Servo-Control Position
Transducer
(Old MMEL ref: 27-34-02)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE



EFF :
ALL
 27-34-00



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-00-710-001
29-10-00-864-003
29-23-00-864-001

29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
27-34-00-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Elevator and Hydraulic
Actuation
Depressurize the Blue Hydraulic System
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 401

3. __________
Job Set-up
Subtask 27-34-00-860-068
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU, release the FLT CTL/ELAC 1 and FLT
CTL/SEC 1 pushbutton switches (on these pushbutton switches, the OFF
legends come on).
(3) On the overhead panel 24VU, release the FLT CTL/ELAC 2, FLT CTL/SEC 2
and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches,
the OFF legends come on).
(4) Depressurize the aircraft hydraulic systems:
(a) For the left elevator:
- Depressurize the Green and Blue systems (Ref. TASK 29-23-00864-001) (Ref. TASK 29-10-00-864-003).
(b) For the right elevator:
- Depressurize the Yellow and Blue systems (Ref. TASK 29-24-00864-001) (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-34-00



AIJ




Page 402
Feb 01/07

Subtask 27-34-00-010-055
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position:


(a) In the zone 334 for the left elevator.
(b) In the zone 344 for the right elevator.
(2) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-34-00-991-004)
Subtask 27-34-00-040-050
A. Connection of the Spare Transducer:
(1) If the servocontrol has two transducers:
(a) Swap the connection of the electrical connectors on the
transducers.
(2) If the servocontrol has three transducers:
(a) Remove the electrical connector (1) from the defective
transducer.
(b) Remove the blanking cap from the new transducer and put it on the
defective transducer.
(c) Connect the electrical connector (1) to the new transducer.
Subtask 27-34-00-710-052
B. Test
(1) On the overhead panel 23VU, push the FLT CTL/ELAC 1 and FLT CTL/SEC 1
pushbutton switches (on these pushbutton switches, the OFF legends go
off).



EFF :
ALL
 27-34-00



AIJ




Page 403
Feb 01/11

R
R

Elevator Servocontrols Position-Transducers


Figure 401/TASK 27-34-00-991-004



EFF :
ALL
 27-34-00



AIJ




Page 404
Feb 01/07

(2) On the overhead panel 24VU, push the FLT CTL/ELAC 2, FLT CTL/SEC 2
and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches,
the OFF legends go off).
(3) Do the operational test of the elevators (Ref. TASK 27-34-00-710001).
5. Close-up
________
Subtask 27-34-00-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(3) Remove the access platform(s).
Subtask 27-34-00-860-069
B. Put the aircraft back to its initial configuration.
(1) Make an entry in the log-book.
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 405
Feb 01/07

TASK 27-34-00-440-001
Reactivation of Elevator Servocontrol Position-Transducer
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-34-02-A)
Elevator Servo-Control Position
Transducer
(Old MMEL ref: 27-34-02)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-864-003
29-23-00-864-001
29-24-00-864-001
55-13-11-000-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Depressurize the Blue Hydraulic System
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels



EFF :
ALL
 27-34-00



AIJ




Page 406
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------55-13-11-400-001
TSM 27
27-34-00-991-004

Install/Close of the THS Trailing Edge Access Panels


(for corrective action)
Fig. 401

3. __________
Job Set-up
Subtask 27-34-00-860-070
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU, release the FLT CTL/ELAC 1 and FLT
CTL/SEC 1 pushbutton switches (on these pushbutton switches, the OFF
legends come on).
(3) On the overhead panel 24VU, release the FLT CTL/ELAC 2, FLT CTL/SEC 2
and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches,
the OFF legends come on).
(4) Depressurize the aircraft hydraulic systems:
(a) For the left elevator:
- Depressurize the Green and Blue systems (Ref. TASK 29-23-00864-001) (Ref. TASK 29-10-00-864-003).
(b) For the right elevator:
- Depressurize the Yellow and Blue systems (Ref. TASK 29-24-00864-001) (Ref. TASK 29-10-00-864-003).
Subtask 27-34-00-010-056
B. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position:


(a) In the zone 334 for the left elevator.
(b) In the zone 344 for the right elevator.



EFF :
ALL
 27-34-00



AIJ




Page 407
Feb 01/11

(2) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-34-00-991-004)


Subtask 27-34-00-440-050
A. Reactivation of the Defective Transducer
(1) If the servocontrol has two transducers:
(a) Swap the connection of the electrical connectors on the
transducers.
(2) If the servocontrol has three transducers:
(a) Remove the electrical connector (1) of the replacement
transducer.
(b) Remove the blanking cap from the defective transducer and install
it on the replacement transducer.
(c) Connect the electrical connector (1) to the defective transducer.
Subtask 27-34-00-710-053
B. Test
(1) On the overhead panel 23VU, push the FLT CTL/ELAC 1 and FLT CTL/SEC 1
pushbutton switches (on these pushbutton switches, the OFF legends go
off).
(2) On the overhead panel 24VU, push the FLT CTL/ELAC 2, FLT CTL/SEC 2
and FLT CTL/SEC 3 pushbutton switches (on these pushbutton switches,
the OFF legends go off).



EFF :
ALL
 27-34-00



AIJ




Page 408
Feb 01/07

(3) Do this test:


Make sure that the transducer you reactivated is defective.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal, on the
MCDU 1 (2), push the MCDU MENU
mode key.

The MCDU shows the MCDU MENU page.

2. Push the line key adjacent to the


CFDS indication.

The MCDU shows the CFDS page.

3. Push the line key adjacent to the


SYSTEM REPORT/TEST indication.

The MCDU shows the SYSTEM REPORT/TEST


page.

4. Push the line key adjacent to the


F/CTL indication.

The MCDU shows the SYSTEM


REPORT/TEST/F/CTL page.

5. Push the line key adjacent to the


EFCS 1(2) indication.

The MCDU shows the EFCS1(2) page.

6. Push the line key adjacent to the


GROUND SCAN indication.

The MCDU shows the EFCS1(2)/GROUND SCAN


page.

7. Push the line key adjacent to the


START GROUND SCAN indication and
wait two minutes.
8. Push the line key adjacent to the
GROUND SCAN STOP indication.
9. Push the line key adjacent to the
GROUND REPORT indication.

Make sure that the display unit shows


the fault indication related to the
defective transducer.

10. On the MCDU, push the line key


The MCDU shows the MCDU MENU page.
adjacent to the RETURN indication
until the CFDS menu page comes
into view.
(4) Do the trouble shooting of the defective transducer (Ref. TSM 27).
Make the necessary corrections.



EFF :
ALL
 27-34-00



AIJ




Page 409
Feb 01/11

5. Close-up
________
Subtask 27-34-00-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(3) Remove the access platform(s).
Subtask 27-34-00-862-056
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 410
Feb 01/07

ELEVATOR AND HYDRAULIC ACTUATION - ADJUSTMENT/TEST


__________________________________________________
TASK 27-34-00-710-001
Operational Test of the Elevator and Hydraulic Actuation
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump



EFF :
ALL
 27-34-00



AIJ




Page 501
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Depressurize the Green and Yellow Hydraulic Systems


after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-34-00-860-054
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002)
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) On the panel 23VU:
- Release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(4) On the panel 24VU:
- Release the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(5) On the overhead panel 20VU, on the ADIRS CDU:
- Set the 3 OFF/NAV/ATT selector switches to NAV.
(6) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).



EFF :
ALL
 27-34-00


R 
AIJ




Page 502
Feb 01/11

Subtask 27-34-00-010-064
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover
Subtask 27-34-00-865-058
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
Subtask 27-34-00-710-050
A. Operational Test of the Elevator and Hydraulic Actuation.

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 23VU and 24VU :
- Push the FLT CTL/ ELAC 1,FLT
CTL/SEC 1,FLT CTL/ELAC 2,FLT
CTL/SEC 2 pushbutton switches.

On the panel 23VU and 24VU:


- On these pushbutton switches the OFF
legends go off,the FAULT legends come
on then go off.

2. Move one of the two sidestick


controllers in the nose up and
nose down directions.

On the lower ECAM display unit, on the


F/CTL page:
- The indexes of the L/ELEV and R/ELEV
indicators move in relation to the
order.

3. On the panel 24VU:

On the panel 24VU:



EFF :
ALL
 27-34-00



AIJ




Page 503
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- Release the FLT CTL/ELAC2
- The OFF legend of the FLT CTL/ELAC2
pushbutton switch.
pushbutton switch comes on.
On the lower ECAM display unit, on the
F/CTL page:
- The ELAC 2 indication becomes amber.
4. Move one of the two sidestick
controllers in the nose up and
nose down direction .

On the lower ECAM display unit, on the


F/CTL page:
- the indexes of the L/ELEV and R/ELEV
indicators move in relation to the
order.

5. On the panel 23VU:


- Release the FLT CTL/ELAC1
pushbutton switch.

On the panel 23VU:


- The OFF legend of the FLT CTL/ELAC1
pushbutton switch comes on.
On the lower ECAM display unit,on the
F/CTL page:
- The ELAC1 indication becomes amber.

6. Move one of the two sidestick


controllers in the nose up and
nose down directions.

On the lower ECAM display unit, on the


F/CTL page:
- The indexes of the L/ELEV and R/ELEV
indicators move in relation to the
order.

7. On the panel 24VU:


Release the FLT CTL/SEC2
pushbutton switch

On the panel 24VU:


- The OFF legend of the FLT CTL/SEC2
pushbutton switch comes on
On the lower ECAM display unit,on the
F/CTL page:
- The SEC2 indication becomes amber.

8. Move one of the two sidestick


controllers in the nose up and
nose down directions.

On the lower ECAM display unit, on the


F/CTL page:
- The indexes of the L/ELEV and R/ELEV
indicators move in relation to the
order.

9. On the panel 23VU:


- Release the FLT CTL/SEC1
pushbutton switch.

On the panel 23VU:


- The OFF legend of the FLT CTL/SEC1
pushbutton switch comes on.
On the lower ECAM display unit,on the
F/CTL page:
- The SEC1 indication becomes amber.



EFF :
ALL
 27-34-00


R 
AIJ




Page 504
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- The indication of the elevator
position is in amber crosses.
On the ground, visually make sure that
the elevators are in the neutral
position.
10. On the panel 23VU:
- Push the FLT CTL/SEC1
pushbutton switch.

On the panel 23VU:


- The OFF legend of the FLT CTL/SEC1
pushbutton switch goes off.
- The FAULT legend comes on then goes
off.
On the lower ECAM display unit, on the
F/CTL page:
- The SEC1 indication becomes green.

11. On the panel 24VU:


- Push the FLT CTL/SEC2
pushbutton switch.

On the panel 24VU:


- The OFF legend of the FLT CTL/SEC2
pushbutton switch goes off.
- The FAULT legend comes on then goes
off.
On the lower ECAM display unit on the
F/CTL page:
- The SEC2 indication becomes green.

12. On the panel 23VU:


- Push the FLT CTL/ELAC1
pushbutton switch.

On the panel 23VU:


- The OFF legend of the FLT CTL/ELAC1
pushbutton switch goes off.
- The FAULT legend comes on then goes
off.
On the lower ECAM display unit on the
F/CTL page:
- The ELAC1 indication becomes green.

13. On the panel 24VU:


- Push the FLT CTL/ELAC2
pushbutton switch.

On the panel 24VU:


- The OFF legend of the FLT CTL/ELAC2
pushbutton switch goes off.
- The FAULT legend comes on then goes
off.



EFF :
ALL
 27-34-00


R 
AIJ




Page 505
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------On the lower ECAM display unit on the
F/CTL page:
- The ELAC2 indication becomes green.
5. Close-up
________
Subtask 27-34-00-860-055
A. Put the Aircraft back to its Initial Configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
R
R

(2) On the overhead panel 20VU, on the ADIRS CDU:


- Set the 3 OFF/NAV/ATT selector switches to OFF.

(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


Subtask 27-34-00-410-062
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Thigthen the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).



EFF :
ALL
 27-34-00



AIJ




Page 506
Nov 01/10

TASK 27-34-00-710-002
Operational Test of the Centering Function
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU



EFF :
ALL
 27-34-00



AIJ




Page 507
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Pressurize the Yellow Hydraulic System with the


Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-34-00-010-061
A. Get Access.
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover
Subtask 27-34-00-860-056
B. Aircraft Maintenance Configuration.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU:
- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(3) On the overhead panel 24VU:
(a) Make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 3 pushbutton
switches are pushed (on these pushbutton switches, the OFF and
FAULT legends are off).
(b) Release the FLT CTL/SEC 2 pushbutton switch (on this pushbutton
switch, the OFF legend comes on).
(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-34-00



AIJ




Page 508
Feb 01/11

(5) On the maintenance panel 50VU:


(a) Make sure that the HYD LEAK MEASUREMENT VALVES/G and HYD LEAK
MEASUREMENT VALVES/Y pushbutton switches are pushed (on these
pushbutton switches, the OFF and FAULT legends are off).
(b) Release the HYD LEAK MEASUREMENT VALVES/B pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
(6) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(7) On the center pedestal, on the ECAM control panel, push the F/CTL
pushbuttton switch (on the lower ECAM display unit, the F/CTL page
comes into view).
NOTE : On the F/CTL page, Make sure that the indexes of the L/ELEV
____
and R/ELEV indicators are in the neutral position on the
vertical scale.
Subtask 27-34-00-865-056
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-34-00


R 
AIJ




Page 509
Feb 01/07

4. Procedure
_________
Subtask 27-34-00-710-054
A. Operational Test of the Centering Function.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the CAPT (F/O) lateral console: On the lower ECAM display unit, on the
- pull the side stick controller
F/CTL page:
rearward until it touches the
- the indexes of the L/ELEV and R/ELEV
stop. Hold it in this position.
indicators move up.
2. On the overhead panel 24VU:
- release the FLT CTL/ELAC 2
pushbutton switch.

On the overhead panel 24VU:


- the OFF legend of the FLT CTL/ELAC 2
pushbutton switch comes on.
On the lower ECAM display unit, on the
F/CTL page:
- the ELAC 2 indication becomes amber.
- the indication of the elevators
position is in amber crosses.
On the ground, visually make sure that
the elevators are in the neutral
position.

3. On the CAPT (F/O) lateral console:


- move and keep the side stick
controller in the neutral
position.
4. On the overhead panel 24VU:
- push the FLT CTL/ELAC 2
pushbutton switch.

On the overhead panel 24VU:


- the OFF legend of the FLT CTL/ELAC 2
pushbutton switch goes off.
- the FAULT legend of the FLT CTL/ELAC
2 pushbutton switch comes on then
goes off.

5. On the CAPT (F/O) lateral console: On the lower ECAM display unit, on the
- push the side stick controller
F/CTL page:
forward until it touches the
- the indexes of the L/ELEV and R/ELEV
stop. Hold it in this position.
indicators move down.
6. On the overhead panel 24VU:

On the overhead panel 24VU:



EFF :
ALL
 27-34-00



AIJ




Page 510
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- release the FLT CTL/ELAC 2
- the OFF legend of the FLT CTL/ELAC 2
pushbutton switch.
pushbutton switch comes on.
On the lower ECAM display unit, on the
F/CTL page:
- the ELAC 2 indication becomes amber.
- the indication of the elevators
position is in amber crosses.
On the ground, visually make sure that
the elevators are in neutral position.
7. On the CAPT (F/O) lateral console:
- move and keep the side stick
controller in the neutral
position.
8. On the overhead panel 23VU:
- push the FLT CTL/ELAC 1
pushbutton switch.

On the overhead panel 23VU:


- the OFF legend of the FLT CTL/ELAC 1
pushbutton switch goes OFF.
- the FAULT legend of the FLT CTL/ELAC
1 pushbutton switch comes on then
goes off.

9. On the maintenance panel 50VU:


On the maintenance panel 50VU:
- push the HYD LEAK MEASUREMENT
- the OFF legend of the HYD LEAK
VALVES/B pushbutton switch.
MEASUREMENT VALVES/B pushbutton
- release the HYD LEAK MEASUREMENT
switch goes off.
VALVES/G and HYD LEAK
- the OFF legends of the HYD LEAK
MEASUREMENT VALVES/Y pushbutton
MEASUREMENT VALVES/G and HYD LEAK
switches.
MEASUREMENT VALVES/Y pushbutton
switches come on.
10. On the lower ECAM display unit,
on the F/CTL page:
- make sure that the indexes of
the L/ELEV and R/ELEV
indicators are in the neutral
position.
11. On the CAPT (F/O) lateral
console:

On the lower ECAM display unit, on the


F/CTL page:



EFF :
ALL
 27-34-00


R 
AIJ




Page 511
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- pull the side stick controller - the indexes of the L/ELEV and R/ELEV
rearward until it touches the
indicators move up.
stop. Hold it in this position.
12. On the overhead panel 23VU:
- release the FLT CTL/ELAC 1
pushbutton switch.

On the overhead panel 23VU:


- the OFF legend of the FLT CTL/ELAC 1
pushbutton switch comes on.
On the lower ECAM display unit, on the
F/CTL page:
- the ELAC 1 indication becomes amber.
- the indication of the elevators
position is in amber crosses.
On the ground, visually make sure that
the elevators are in the neutral
position.

13. On the CAPT (F/O) lateral


console:
- move and keep the side stick
controller in the neutral
position.
14. On the overhead panel 23VU:
- push the FLT CTL/ELAC 1
pushbutton switch.

On the overhead panel 23VU:


- the OFF legend of the FLT CTL/ELAC 1
pushbutton switch goes off.
- the FAULT legend of the FLT CTL/ELAC
1 pushbutton switch comes on then
goes off.

15. On the CAPT (F/O) lateral


On the lower ECAM display unit, on the
console:
F/CTL page:
- push the side stick controller - the indexes of the L/ELEV and R/ELEV
forward until it touches the
indicators move down.
stop. Hold it in this position.
16. On the overhead panel 23VU:
- release the FLT CTL/ELAC 1
pushbutton switch.

On the overhead panel 23VU:


- the OFF legend of the FLT CTL/ELAC 1
pushbutton switch comes on.
On the lower ECAM display unit, on the
F/CTL page:
- the ELAC 1 indication becomes amber.



EFF :
ALL
 27-34-00


R 
AIJ




Page 512
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- the indication of the elevators
position is in amber crosses.
On the ground, visually make sure that
the elevators are in the neutral
position.
17. On the CAPT (F/O) lateral
console:
- move the side stick controller
to the neutral position.
5. Close-up
________
Subtask 27-34-00-860-057
A. Put the Aircraft back to its Initial Configuration.
(1) On the maintenance panel 50VU:
- Push the HYD LEAK MEASUREMENT VALVES/G and HYD LEAK MEASUREMENT
VALVES/Y pushbutton switches (on these pushbutton switches the OFF
legends go off).
(2) On the overhead panel 23VU:
- Push the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on
these pushbutton switches, the OFF legends go off).
(3) On the overhead panel 24VU:
- Push the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches (on
these pushbutton switches, the OFF legends go off).
(4) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(5) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 513
Feb 01/11

Subtask 27-34-00-410-061
B. Close Access.
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822
(4) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 514
Feb 01/11

TASK 27-34-00-820-001
Adjustment of the Elevator and Hydraulic Actuation (with the reference triangle
on the tail cone)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
NOTE : You can do this task together with AMM task 27-34-00-200-001 to
____
prevent elevator vibration.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

0U190360
98D27303000001
98D27903500000

warning notice
warning notices
1 ACCESS PLATFORM
1 ACCESS PLATFORM
1 ACCESS PLATFORM
Torque Wrench :

3M (10 FT)- ADJUSTABLE


6M (20 FT) - ADJUSTABLE
2M (6 FT) - ADJUSTABLE
range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-00



AIJ




Page 515
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire-corrosion resistant steel dia 0.8 mm (0.03


in.)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-00-200-002
27-34-00-220-003
27-34-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
27-34-00-991-023
27-34-00-991-001
27-34-00-991-009

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Elevator Servo Control Oscillations.
Check of the Position of the Reference Triangle on
the Tail Cone
Operational Test of the Elevator and Hydraulic
Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 501
Fig. 502
Fig. 503

3. __________
Job Set-up
Subtask 27-34-00-861-051
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).



EFF :
ALL
 27-34-00



AIJ




Page 516
Nov 01/09

Subtask 27-34-00-010-051
B. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in the
zone 312.
(2) Open the access door 312AR.

(3) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in these
zones :
(a) 334 for the left elevator.
(b) 344 for the right elevator.
(4) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.

(5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(6) Open the access door 822.
(7) On the battery power center 105VU:
- loosen the two screws and remove the protective cover
Subtask 27-34-00-865-051
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34



EFF :
ALL
 27-34-00



AIJ




Page 517
Feb 01/11

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-860-065
D. Aircraft Maintenance Configuration
(1) On the overhead panel 20VU, make sure that:
- the 3 OFF/NAV/ATT selector switches are in OFF position.
(2) On the overhead panel 23VU, make sure that:
- the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches are pushed
(on these pushbutton switches, the FAULT and OFF legends are off).
(3) On the overhead panel 24VU, make sure that:
- the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches are pushed
(on these pushbutton switches, the FAULT and OFF legends are off).
(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(5) On the center pedestal, make sure that the pitch-trim control wheels
are set to 0.
(6) Put a warning notice on the pitch-trim control wheels to tell persons
not to move the THS.
(7) Safety the CAPT and F/O side stick controllers with the PIN-SIDE
STICK LOCKING (98D27903500000).
(8) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(9) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) (5) on the screwjack of the THS actuator (6).
(10) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
(11) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) on the trailing edge of the elevator near the
tail cone.
(Ref. Fig. 501/TASK 27-34-00-991-023)



EFF :
ALL
 27-34-00


R 
AIJ




Page 518
Feb 01/11

Pointer and Triangle Reference Positioning


Figure 501/TASK 27-34-00-991-023



EFF :
ALL
 27-34-00



AIJ




Page 519
May 01/10

4. Procedure
_________
R

(Ref. Fig. 502/TASK 27-34-00-991-001)


Subtask 27-34-00-220-059
A. Check of the Position of the Reference Triangle.
(1) Before adjustment of the elevators, check the position of the
reference triangle (Ref. TASK 27-34-00-220-003).
Subtask 27-34-00-820-051
B. Adjustement of the Elevator and the Hydraulic Actuation
NOTE : The inboard servocontrols (Green and Yellow) are in the active
____
mode.
The outboard servocontrols (Blue) are in the damping mode.
NOTE : If you see oscillations when the servo control is in the active
____
mode, do a check of these oscillations (Ref. TASK 27-34-00-200002).
(1) With the pointer make sure that:
- the trailing edges of the elevators are aligned with the reference
triangle on the two sides of the tail cone. If not, adjust the
inboard servocontrol:
(a) Cut and remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Move the lock washers (3) apart.
(d) Turn the rod (4) (in the correct direction) until the trailing
edges of the elevators are aligned with the reference triangle on
the two sides of the tail cone.
(e) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft).
(f) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(g) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).



EFF :
ALL
 27-34-00



AIJ




Page 520
Feb 01/09

Adjustment of the Elevator Servocontrol


Figure 502/TASK 27-34-00-991-001



EFF :
ALL
 27-34-00



AIJ




Page 521
Feb 01/09

(h) Make sure that you can engage easily the rigging pin into the
elevator position transducer-unit (1) on the two sides.
(Ref. Fig. 503/TASK 27-34-00-991-009)

NOTE : The rigging pin is part of the transducer unit.


____
If you cannot, adjust the length of the control rod (4) as
follows:
1
_

Depressurize the aircraft hydraulic systems (Ref. TASK 29-1000-864-003) (Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00864-001).

2
_

Cut and discard the lockwire from the nuts (2).

3
_

Loosen the nuts (2).

4
_

Remove the bonding lead from the lock washer (3).

5
_

Disengage the lock washers (3).

6
_

Turn the control rod body (4) until you can engage freely the
rigging pin in the transducer unit (1).

7
_

Engage the lock washers (3) and tighten the nuts (2) on the
rod (4).

8
_

Pressurize the aircraft hydraulic systems (Ref. TASK 29-10-00863-003) (Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863001).

9
_

Do again these steps (from para.6_) until you can engage


freely the rigging pin in the transducer unit (1).

10
__

When you can engage the rigging pin:


- On the upper ECAM display unit, make sure that the ELAC 2
PITCH FAULT warning is not shown.
- Depressurize the aircraft hydraulic systems (Ref. TASK 2910-00-864-003) (Ref. TASK 29-23-00-864-001) (Ref. TASK 2924-00-864-001).

11
__

Tighten the lock nut

12
__

Safety the nuts (2) with lockwire-corrosion resistant steel


dia 0.8 mm (0.03 in.).

13
__

Install the bonding lead on the washer (3).



EFF :
ALL
 27-34-00



AIJ




Page 522
Feb 01/09

Elevator Position Transducer Unit


Figure 503/TASK 27-34-00-991-009



EFF :
ALL
 27-34-00



AIJ




Page 523
Feb 01/09

14
__

Safety the lock nut with Lockwire corrosion-resistant steel


dia 0.8 mm (0.03 in.)

15
__

Pressurize the aircraft hydraulic systems (Ref. TASK 29-10-00863-003) (Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863001).

(2) On the overhead panel 24VU:


- release the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend comes on).
(3) Make sure that the elevator trailing edge position has not changed.
NOTE : Now, the inboard servocontrols are in the damping mode.
____
The outboard servocontrols are in the active mode.
(4) If the elevator moves, do this adjustment :
(a) Cut and remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Move the lock washers (3) apart.
(d) Turn the rod (4) (in the correct direction) until:
1
_

The trailing edges of the elevators are aligned with the


reference triangle on the two sides of the tail cone.

2
_

You can easily engage and disengage the rigging pin into the
elevator position transducer-unit.

3
_

On the upper ECAM display unit, make sure that the ELAC 1
PITCH FAULT warning is not shown.

(e) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft).
(f) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(g) Safety the lock nut (2) with Locwire corrosion-resistant steel
dia 0.8 mm (0.03 in.).



EFF :
ALL
 27-34-00


R 
AIJ




Page 524
Feb 01/09

(5) On the overhead panel 24VU:


- push the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend goes off and the FAULT legend comes).
- when the FAULT legend goes off, release the FLT CTL/ELAC 2
pushbutton switch (on this pushbutton switch, the OFF legend comes
on).
(6) Make sure that the elevator trailing edge position has not changed.
If you see a position variation, do the adjustment of the
servocontrol again.
(7) On the overhead panel 24VU:
- push the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(8) Remove the pointer of LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001).
(9) Remove the rigging pin from the CAPT and F/O sidestick controllers.
(10) Remove the rigging pin (5) from the screwjack of the THS actuator
(6).
(Ref. Fig. 502/TASK 27-34-00-991-001)

Subtask 27-34-00-710-051
C. Test
(1) Do the operational test of the elevators (Ref. TASK 27-34-00-710001).
5. Close-up
________
Subtask 27-34-00-860-064
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Remove the warning notice(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00



AIJ




Page 525
Feb 01/09

Subtask 27-34-00-410-051
B. Close Access
(1) Close the access door 312AR.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334DB for the left elevator
(b) 344DB for the right elevator
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822
(6) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 526
Feb 01/09

TASK 27-34-00-820-002
Adjustment of the Elevator and Hydraulic Actuation after Removal/Installation
of one Servocontrol
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
NOTE : You can do this task together with AMM task 27-34-00-200-001 to
____
prevent elevator vibration.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific
No specific
0U190360
98D27903500000
FOR FIN 34CE3, 34CE4
No specific
98D27303000001

1
1
1
1
2

warning notice
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PIN-SIDE STICK LOCKING

Torque Wrench : range 0.20 to 3.60 m.daN


(2.00 to 26.00 lbf.ft)
1 LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER



EFF :
ALL
 27-34-00



AIJ




Page 527
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 34CE3, 34CE4
No specific

Lockwire-corrosion resistant steel dia 0.8 mm (0.03


in.)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-00-710-001
27-34-00-820-003
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
27-34-00-991-001
FOR FIN 34CE3, 34CE4
27-34-00-991-023
27-34-00-991-009

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Elevator and Hydraulic
Actuation
Adjustment of the Elevator and Hydraulic Actuation
with the Gauge-Elevator Neutral Setting
(98D27309002000)
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 502
Fig. 501
Fig. 503



EFF :
ALL
 27-34-00



AIJ




Page 528
May 01/10

3. __________
Job Set-up
Subtask 27-34-00-861-060
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 27-34-00-010-059
B. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
312.
(2) Open the access door 312AR.

(3) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at zones:
(a) 334 for the left elevator.
(b) 344 for the right elevator.
(4) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.

(5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door822.
(6) Open the access door 822
(7) On the battery power center 105VU:
- loosen the two screws and remove the protective cover



EFF :
ALL
 27-34-00



AIJ




Page 529
Feb 01/11

Subtask 27-34-00-865-057
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-860-067
D. Aircraft Maintenance Configuration
(1) On the overhead panel 20VU:
- Make sure that the 3 OFF/NAV/ATT selector switches are in OFF
position.
(2) On the overhead panel 23VU:
- Make sure that the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(3) On the overhead panel 24VU:
- Make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(5) On the center pedestal, make sure that the pitch-trim control wheels
are set to O.
(6) Put a warning notice on the pitch-trim control wheels to tell persons
not to move the THS.



EFF :
ALL
 27-34-00


R 
AIJ




Page 530
May 01/10

(7) Install the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and
F/O side stick controllers.
(8) Put the warning notice on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(9) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) (5) on the screwjack of the THS actuator (6).
(Ref. Fig. 502/TASK 27-34-00-991-001)
(10) Put the servocontrol you adjust (new installed) in the damping mode,
as follows:
(a) FOR 34CE1, 34CE2
- Release the FLT CTL/ELAC 2 pushbutton switch (on this
pushbutton switch, the OFF legend comes on).
- The FLT CTL/ELAC 1 pushbutton switch is pushed (on this
pushbutton switch, the OFF and FAULT legends are OFF).
(b) FOR 34CE3, 34CE4
- The FLT CTL/ELAC 2 pushbutton switch is pushed (on this
pushbutton switch, the OFF and FAULT legends are off).
(11) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
R
R
R
R

(12) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,


RUDDER (98D27303000001) on the trailing edge of the elevator near the
tail cone.
(Ref. Fig. 501/TASK 27-34-00-991-023)

R
R

(13) With the pointer, make sure that the trailing edge of the elevator is
aligned with the reference triangle.

(14) Remove the access panels 334CB, 344CB.

(15) Make sure that you can easily engage and disengage the rigging pin
into the elevator position transducer unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)
NOTE : The rigging pin is part of the transducer unit.
____



EFF :
ALL
 27-34-00



AIJ




Page 531
May 01/10

4. Procedure
_________
(Ref. Fig. 502/TASK 27-34-00-991-001)
Subtask 27-34-00-820-056
A. Adjustment of the Elevator and Hydraulic Actuation
NOTE : If the two servocontrols on the same elevator must be adjusted, do
____
the adjustment of the elevator and hydraulic actuation with the
gauge elevator neutral setting (Ref. TASK 27-34-00-820-003).
(1) Put the servocontrol you adjust (new installed) in the active mode,
as follows:
(a) FOR 34CE1, 34CE2
- Push the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(b) FOR 34CE3, 34CE4
- Release the FLT CTL/ELAC 2 pushbutton switch (on this
pushbutton switch, the OFF legend comes on).
- The FLT CTL/ELAC 1 pushbutton switch is pushed (on this
pushbutton switch, the OFF and FAULT legend are off).
(2) If the position of the elevator has changed, do as follows:
(a) Cut and remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Move the lock washers (3) apart.
(d) Turn the rod (4) until the trailing edge of the elevator is
aligned with the reference triangle.
(e) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft). Do not safety the lock nut (2) at this time.
(f) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(3) Make sure that you can easily engage and disengage the rigging pin
into the elevator position transducer unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)



EFF :
ALL
 27-34-00


R 
AIJ




Page 532
May 01/10

(4) Set the servocontrol to the damping mode.


(a) FOR 34CE1, 34CE2
- Release the FLT CTL/ELAC 2 pushbutton switch (on this
pushbutton switch, the OFF legend comes on).
- The FLT CTL/ELAC 1 pushbutton switch is pushed (on this
pushbutton switch, the OFF and FAULT legends are off).
(b) FOR 34CE3, 34CE4
- Push the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(5) Make sure that the elevator trailing edge position has not changed.
If you see a position variation, do the adjustment of the
servocontrol again.
(6) Safety the lock nut (2) with Lockwire-corrosion resistant steel dia
0.8 mm (0.03 in.).
(7) Preparation for the Test
(a) FOR 34CE1, 34CE2
- Push the FLT CTL/ELAC 2 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(b) FOR 34CE3, 34CE4
- Push the FLT CTL/ELAC 1 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(c) Remove the rigging pin from the CAPT and F/O side stick
controllers.
(d) Remove the rigging pin (5) from the screw jack of the THS
actuator (6).
Subtask 27-34-00-710-055
B. Test
(1) Do the operational test of the elevators (Ref. TASK 27-34-00-710001).



EFF :
ALL
 27-34-00


R 
AIJ




Page 533
May 01/10

5. Close-up
________
Subtask 27-34-00-860-066
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Remove the warning notice(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-34-00-410-059
B. Close Access
(1) Close the access door 312AR.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334CB, 334DB for the left elevator.
(b) 344CB, 344DB for the right elevator.
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822
(6) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 534
May 01/10

TASK 27-34-00-820-003
Adjustment of the Elevator and Hydraulic Actuation to 0.5 Degrees Nose-Up with
the Gauge-Elevator Neutral Setting (98D27309006000)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
NOTE : You can do this task together with AMM task 27-34-00-200-001 to
____
prevent elevator vibration.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific

threaded pins
warning notice
warning notices
access platform
1 ACCESS PLATFORM
1 ACCESS PLATFORM
Torque Wrench :

No specific

1.6 m (5 ft. 3 in.)


3M (10 FT)- ADJUSTABLE
6M (20 FT) - ADJUSTABLE
range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
GAUGE-ELEVATOR NEUTRAL SETTING
PIN-SIDE STICK LOCKING

0U190360
98D27303000001
98D27309006000
98D27903500000

1
1
1
2

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire-corrosion resistant steel dia 0.8 mm (0.03


in.)



EFF :
ALL
 27-34-00


R 
AIJ




Page 535
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

8
10
10
17
20
20

reference triangle
cotter pin
cotterpin
cotter pin
cotter pin
cotter pin

11-21-27
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07

02 -010
11 -030
11 -030
11 -020A
11 -030
12C-020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------11-00-00-960-001
24-41-00-861-002
24-41-00-862-002
27-34-00-200-001
27-34-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001

Replacement of the Tail Cone Reference Triangle


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Elevator Servo Controls and Hinge
Bearings for too much Play and Condition
Operational Test of the Elevator and Hydraulic
Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System



EFF :
ALL
 27-34-00



AIJ




Page 536
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------52-41-00-010-002
52-41-00-410-002
55-13-11-000-001
55-13-11-400-001
27-34-00-991-023
27-34-00-991-001
27-34-00-991-009
27-34-00-991-011
27-34-00-991-013
27-34-00-991-020
27-34-00-991-021

Open the Avionics Compartment Doors for Access


Close the Avionics Compartment Doors after Access
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 501
Fig. 502
Fig. 503
Fig. 504
Fig. 505
Fig. 506
Fig. 507

3. __________
Job Set-up
Subtask 27-34-00-010-065
A. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone
312.

(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in these
zones:
(a) 334 for the left elevator.
(b) 344 for the right elevator.
(3) Open the access door 312AR.
(4) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(5) Put the access platform in position at the access door 822.
(6) Open the access door 822 (Ref. TASK 52-41-00-010-002).
(7) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.



EFF :
ALL
 27-34-00



AIJ




Page 537
Feb 01/11

Subtask 27-34-00-865-061
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-860-071
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 20VU:
- make sure that the three OFF/NAV/ATT selector switches are in OFF
position.
(3) On the overhead panel 23VU:
- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(4) On the overhead panel 24VU:
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(5) On the upper ECAM display unit:
- make sure that the F/CTL ELAC 2 FAULT or F/CTL ELAC 2 PITCH FAULT
warning is not shown.
(6) On the maintenance panel 50VU, make sure that the HYD/LEAK
MEASUREMENT VALVES/G, B and Y pushbutton switches are pushed (the OFF
legends of the HYD/LEAK MEASUREMENT VALVES/G, B and Y are off).



EFF :
ALL
 27-34-00


R 
AIJ




Page 538
May 01/10

(7) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(8) On the center pedestal, make sure that the pitch-trim control wheels
are set to 0.
(9) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(10) Put a warning notice on the pitch-trim control wheels to tell persons
not to move the THS.
(11) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
Subtask 27-34-00-480-054
D. Installation of the Tools
(1) Safety the CAPT and F/O side sticks with the PIN-SIDE STICK LOCKING
(98D27903500000).
(2) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to move the side sticks.
(3) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) (5) on the screwjack of the THS actuator (6).
(Ref. Fig. 502/TASK 27-34-00-991-001)
(4) Do a check of the play at the trailing edge of the elevators
(Ref. TASK 27-34-00-200-001).
NOTE : It is not necessary to do this step if you replaced the
____
elevator servocontrol or the elevator servocontrol rod end.
(5) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) on the
right side:
(Ref. Fig. 504/TASK 27-34-00-991-011)
(a) Remove the screw (12) and the protector (13) from the setting bar
(10).
(b) Remove the other protectors from the setting bar.
(c) Remove the two screws (7) from the access panel.



EFF :
ALL
 27-34-00


R 
AIJ




Page 539
May 01/10

Installation of the Elevator Neutral Setting Gauge


Figure 504/TASK 27-34-00-991-011


EFF :
ALL
 27-34-00


R 
AIJ




Page 540
May 01/10

(d) Install the yoke (8) on the THS.


(Ref. Fig. 505/TASK 27-34-00-991-013)
To keep a good contact between the yoke and the THS, you must not
TORQUE the threaded pins.
(e) Install the two threaded pins (9) on the yoke (8).
(f) Install the setting bar (10) on the yoke (8).
(6) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001) at the trailing edge of the elevator, between the
two servocontrols.
4. Procedure
_________
Subtask 27-34-00-820-059
A. Adjustment of the Inboard Servocontrol of the Right Elevator
NOTE : At this step, the inboard servocontrol (Yellow) is in the active
____
mode. The outboard servocontrol (Blue) is in the damping mode.
(1) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.



EFF :
ALL
 27-34-00



AIJ




Page 541
Nov 01/10

Installation of the yoke


Figure 505/TASK 27-34-00-991-013


EFF :
ALL
 27-34-00


R 
AIJ




Page 542
May 01/10

Elevator servocontrol attachment


Figure 506/TASK 27-34-00-991-020


EFF :
ALL
 27-34-00


R 
AIJ




Page 543
May 01/10

Illustration of the THS servocontrol attachment


Figure 507/TASK 27-34-00-991-021


EFF :
ALL
 27-34-00


R 
AIJ




Page 544
May 01/10

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(4) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11) , the new cotterpin (10) or lockwasher
(15).

R
R

(5) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(6) Push with your hands on the front and on the middle of the setting
bar and make sure that the contact of the setting bar (10) between
the yoke (8) and the THS surface is correct.
(Ref. Fig. 505/TASK 27-34-00-991-013)
(7) Make sure that the gap between the upper surface of the elevator and
the end part of the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000)
(10) is in the limits of the feeler gauge (11).
(Ref. Fig. 504/TASK 27-34-00-991-011)
(8) If not, adjust the inboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until the upper
surface of the elevator touches the feeler gauge (11) in its
limit position.



EFF :
ALL
 27-34-00



AIJ




Page 545
Nov 01/10

(e) Engage the lock washer (3).


(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(h) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(9) Make sure that you can easily engage/disengage the rigging pin
into/from the elevator position transducer-unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)
NOTE : The rigging pin is a part of the transducer unit.
____
If you cannot, adjust the length of the control rod (4):
(a) Cut and discard the lockwire from the nut (2) (transducer unit
side).
(b) Remove the bonding lead from the lock washer (3).
(c) Loosen the nuts (2).
(d) Disengage the lock washers (3).
(e) Turn the control rod body (4) until you can engage freely the
rigging pin in the transducer unit (1).
(f) Engage the lock washers (3) and tighten the nuts (2) on the rod
(4).
(g) Make sure that you can engage/disengage freely the rigging pin
into/from the elevator position transducer-unit (1).
(h) On the upper ECAM display unit, make sure that the ELAC 2 PITCH
FAULT warning is not shown.
(i) Safety the nut (2) (transducer unit side) with lockwire-corrosion
resistant steel dia 0.8 mm (0.0314 in.).
(j) Install the bonding lead on the washer (3).
(10) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-34-00


R 
AIJ




Page 546
Nov 01/10

Subtask 27-34-00-869-092
B. Servoing Change
(1) On the overhead panel 24VU:
(a) Release the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(2) On the overhead panel 23VU:
(a) Push the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on
these pushbutton switches, the OFF legends are off).
(b) Make sure that the F/CTL ELAC 1 FAULT or F/CTL ELAC 1 PITCH FAULT
warning is not shown on the upper ECAM display unit.
Subtask 27-34-00-820-060
C. Adjustment of the Outboard Servocontrol of the Right Elevator
NOTE : At this step, the inboard servocontrol (Yellow) is in the damping
____
mode. The outboard servocontrol (Blue) is in the active mode.
(1) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10) .
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.



EFF :
ALL
 27-34-00



AIJ




Page 547
Nov 01/10

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(4) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R

(5) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(6) Make sure that the contact of the setting bar (10) between the yoke
(8) and the THS surface is correct.
(7) Push with your hands on the front and on the middle of the setting
bar and make sure that the gap between the upper surface of the
elevator and the end part of the GAUGE-ELEVATOR NEUTRAL SETTING
(98D27309006000) (10) is in the limits of the feeler gauge (11).
(Ref. Fig. 504/TASK 27-34-00-991-011, 505/TASK 27-34-00-991-013)
If not, adjust the outboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove and discard the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until:
- the upper surface of the elevator touches the feeler gauge (11)
in its limit position
- you can easily engage/disengage the rigging pin into/from the
elevator position transducer-unit (1).



EFF :
ALL
 27-34-00



AIJ




Page 548
Nov 01/10

(e) Engage the lock washer (3).


(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(h) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(i) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR,
AILERON, RUDDER (98D27303000001) on the trailing edge of the
elevator in front of the tail cone.
(Ref. Fig. 501/TASK 27-34-00-991-023)

(j) Install a new reference triangle (8) on the tail cone with its
center in line with the pointer on the trailing edge of the
elevator (Ref. TASK 11-00-00-960-001).
(k) Remove the pointer of the LOAD,APPLICATION TOOL-ELEVATOR,
AILERON, RUDDER (98D27303000001).
(8) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
Subtask 27-34-00-080-053
D. Removal of the Tools
(1) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) from the
upper surface of the right elevator.
(a) Remove the setting bar (10) from the yoke (8).
(b) Remove the two threaded pins (9) and the yoke.
(c) Install the two screws (7) on the access panel.
(2) Remove the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001).



EFF :
ALL
 27-34-00



AIJ




Page 549
May 01/10

Subtask 27-34-00-480-055
E. Installation of the Tools
(1) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) on the
left side:
(Ref. Fig. 504/TASK 27-34-00-991-011)
(a) Remove the two screws (7) from the access panel.
(b) Install the yoke (8) on the THS.
(Ref. Fig. 505/TASK 27-34-00-991-013)
To keep a good contact between the yoke and the THS, you must not
TORQUE the threaded pins.
(c) Install the two threaded pins (9) on the yoke (8).
(d) Install the setting bar (10) on the yoke (8).
(2) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001), at the trailing edge of the elevator, between the
two servocontrols.
Subtask 27-34-00-820-061
F. Adjustment of the Inboard Servocontrol of the Left Elevator
(1) On the overhead panel 24VU:
(a) Push the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches (on
these pushbutton switches, the OFF legends goes off).
(b) Make sure that there is no F/CTL ELAC 2 FAULT or F/CTL ELAC 2
PITCH FAULT warning on the upper ECAM display unit.
(2) On the overhead panel 23VU:
(a) Release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends comes on).
NOTE : At this step, the inboard servocontrol (Green) is in the
____
active mode. The outboard servocontrol (Blue) is in the
damping mode.



EFF :
ALL
 27-34-00


R 
AIJ




Page 550
May 01/10

(3) To take up the play of the servocontrol attachment:


(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(5) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(6) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R

(7) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).



EFF :
ALL
 27-34-00



AIJ




Page 551
Nov 01/10

(8) Push with your hands on the front and on the middle of the setting
bar and make sure that the setting bar (10) between the yoke (8) and
the THS surface is correct.
(Ref. Fig. 505/TASK 27-34-00-991-013)
(9) Make sure that the gap between the upper surface of the elevator and
the end part of the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000)
(10) is in the limits of the feeler gauge (11).
(Ref. Fig. 504/TASK 27-34-00-991-011)
(10) If not, adjust the inboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove and discard the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until the upper
surface of the elevator touches the feeler gauge (11) in its
limit position.
(e) Engage the lock washer (3).
(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(h) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(11) Make sure that you can engage/disengage the rigging pin easily
into/from the elevator position transducer-unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)
NOTE : The rigging pin is a part of the transducer unit.
____
If you cannot, adjust the length of the control rod (4):
(a) Cut and discard the lockwire from the nut (2) (transducer unit
side).
(b) Remove the bonding lead from the lock washer (3).



EFF :
ALL
 27-34-00


R 
AIJ




Page 552
May 01/10

(c) Loosen the nuts (2).


(d) Disengage the lock washers (3).
(e) Turn the control rod body (4) until you can engage freely the
rigging pin of the transducer unit (1).
(f) On the upper ECAM display unit, make sure that the ELAC 2 PITCH
FAULT warning is not shown.
(g) Safety the nut (2) (transducer unit side) with lockwire-corrosion
resistant steel dia 0.8 mm (0.0314 in.).
(h) Install the bonding lead on the washer (3).
(12) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
Subtask 27-34-00-869-093
G. Servoing Change
(1) On the overhead panel 24VU:
(a) Release the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(2) On the overhead panel 23VU:
(a) Push the FLT CTL/ELAC 1 and FLT CTL/SEC1 pushbutton switches (on
these pushbutton switches, the OFF legends go off).
(b) Make sure that the F/CTL ELAC 1 FAULT or F/CTL ELAC 1 PITCH FAULT
warning is not shown on the upper ECAM display unit.



EFF :
ALL
 27-34-00


R 
AIJ




Page 553
May 01/10

Subtask 27-34-00-820-062
H. Adjustment of the Outboard Servo control of the Left Elevator
NOTE : At this step, the inboard servocontrol (Green) is in the damping
____
mode. The outboard servocontrol (Blue) is in the active mode.
(1) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(4) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R



EFF :
ALL
 27-34-00



AIJ




Page 554
Nov 01/10

(5) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(6) Push with your hands on the front and the on the middle of the
setting bar and make sure that the contact of the setting bar (10)
between the yoke (8) and the THS surface is correct.
(Ref. Fig. 505/TASK 27-34-00-991-013)
(7) Make sure that the gap between the upper surface of the elevator and
the end part of the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000)
(10) is in the limits of the feeler gauge (11).
(Ref. Fig. 504/TASK 27-34-00-991-011)
(8) If not, adjust the outboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove and discard the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until:
- the upper surface of the elevator touches the feeler gauge (11)
in its limit position
- you can easily engage/disengage the rigging pin into/from the
elevator position transducer-unit (1).
(e) Engage the lock washer (3).
(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(h) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(9) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) on the trailing edge of the elevator in front
of the tail cone.
(Ref. Fig. 501/TASK 27-34-00-991-023)



EFF :
ALL
 27-34-00



AIJ




Page 555
May 01/10

(10) Install a new reference triangle (8) on the tail cone with its center
in line with the pointer on the trailing edge of the elevator
(Ref. TASK 11-00-00-960-001).
(11) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
Subtask 27-34-00-480-056
J. Removal of the tools
(1) Remove the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001).
(2) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) from the
upper surface of the left elevator
(a) Remove the setting bar (10) from the yoke (8).
(b) Remove the two threaded pins (9) and the yoke.
(c) Install the two screws (7) on the access panel.
(d) Install the protector (13) and the screw (12) on the setting bar
(10).
(e) Install the other protectors on the setting bar.
(3) Remove the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001).
Subtask 27-34-00-710-057
K. Test
(1) Preparation for the test
(a) Removal of the tools
1
_

Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) from the screwjack of the THS actuator (6).
(Ref. Fig. 502/TASK 27-34-00-991-001)

2
_

Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the


CAPT and F/O side sticks.



EFF :
ALL
 27-34-00


R 
AIJ




Page 556
May 01/10

(b) On the overhead panel 24VU:


1
_

Push the FLT CTL/ELAC 2 and FLT CTL/SEC2 pushbutton switches


(on these pushbutton switches, the OFF legends go off).

(2) Do the operational test of the elevators (Ref. TASK 27-34-00-710001).


5. Close-up
________
Subtask 27-34-00-860-072
A. Put the Aircraft back to its Initial Configuration.
(1) Remove the warning notice(s).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-34-00-410-063
B. Close Access.
(1) Close the access door 312AR.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822 (Ref. TASK 52-41-00-410-002).
(6) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 557
May 01/10

TASK 27-34-00-820-003- 01
Adjustment of the Elevator and Hydraulic Actuation to 0.5 Degrees Nose-Up with
the Gauge-Elevator Neutral Setting (98D27309002000)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
NOTE : You can do this task together with AMM task 27-34-00-200-001 to
____
prevent elevator vibration.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

No
No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific
specific

1
1
1

No specific
0U190360
98D27303000001
98D27309002000
98D27903500000

1
1
1
2

adhesive paper tape


pointer
warning notice
warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
GAUGE-ELEVATOR NEUTRAL SETTING
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-00



AIJ




Page 558
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire-corrosion resistant steel dia 0.8 mm (0.03


in.)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

8
10
10
17
20
20

reference triangle
cotter pin
cotterpin
cotter pin
cotter pin
cotter pin

11-21-27
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07

02 -010
11 -030
11 -030
11 -020A
11 -030
12C-020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------11-00-00-960-001
24-41-00-861-002
24-41-00-862-002
27-34-00-200-001
27-34-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
52-41-00-010-002
52-41-00-410-002
55-13-11-000-001
55-13-11-400-001

Replacement of the Tail Cone Reference Triangle


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Elevator Servo Controls and Hinge
Bearings for too much Play and Condition
Operational Test of the Elevator and Hydraulic
Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Open the Avionics Compartment Doors for Access
Close the Avionics Compartment Doors after Access
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels



EFF :
ALL
 27-34-00



AIJ




Page 559
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-991-001
27-34-00-991-009
27-34-00-991-020
27-34-00-991-021
27-34-00-991-010
27-34-00-991-008

Fig.
Fig.
Fig.
Fig.
Fig.
Fig.

502
503
506
507
508
509

3. __________
Job Set-up
Subtask 27-34-00-010-066
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone
312.
(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in these
zones:
(a) 334 for the left elevator.
(b) 344 for the right elevator.
(3) Open the access door 312AR.
(4) Open the THS trailing edge access panels (Ref. TASK 55-13-11-000001):
(a) 334DB, 334AT 334BB for the left elevator.
(b) 344DB, 344AT 344BB for the right elevator.
(5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the
access door 822.
(6) Open the access door 822 (Ref. TASK 52-41-00-010-002).
(7) On the battery power center 105VU:
- loosen the two screws and remove the protective cover



EFF :
ALL
 27-34-00


R 
AIJ




Page 560
Aug 01/11

Subtask 27-34-00-865-062
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-860-073
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 20VU:
- make sure that the 3 OFF/NAV/ATT selector switches are in OFF
position.
(3) On the overhead panel 23VU:
- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(4) On the overhead panel 24VU:
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (on these pushbutton switches, the FAULT and
OFF legends are off).
(5) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(6) On the center pedestal, make sure that the pitch-trim control wheels
are set to 0.



EFF :
ALL
 27-34-00


R 
AIJ




Page 561
May 01/10

(7) Put a warning notice on the pitch-trim control wheels to tell persons
not to move the THS.
(8) Make sure that the F/CTL ELAC 2 PITCH FAULT warning does not comes
into view on the upper ECAM display unit.
(9) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
Subtask 27-34-00-480-057
D. Installation of the Tools
(1) Safety the CAPT and F/O side sticks with the PIN-SIDE STICK LOCKING
(98D27903500000).
(2) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to move the side sticks.
(3) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) (5) on the screwjack of the THS actuator (6).
(Ref. Fig. 502/TASK 27-34-00-991-001)
(4) Do a check of the play of the elevators (Ref. TASK 27-34-00-200-001).
(5) Install the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) at the trailing edge of the elevator, in
front of the tail cone.
(Ref. Fig. 508/TASK 27-34-00-991-010)
(6) Install an adhesive paper tape on the tail cone in front of the
pointer.
(7) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309002000):
(Ref. Fig. 509/TASK 27-34-00-991-008)
(a) Remove the pin (2) and the wedge (3) from the side plates (6).
(b) Turn the adjuster knob (11) counterclockwise until the setting
bar (10) is in its highest position.
(c) Install the tool (1) on the hinge bearing of the elevator and the
THS:
1
_

The rib (7) (hinge arm n1) must be between the side plates
(6).



EFF :
ALL
 27-34-00


R 
AIJ




Page 562
May 01/10

Adjustment of the Elevator to 0.5 Degrees nose-up


Figure 508/TASK 27-34-00-991-010


EFF :
ALL
 27-34-00


R 
AIJ




Page 563
May 01/10

Installation of the Elevator Neutral Setting Gauge


Figure 509/TASK 27-34-00-991-008


EFF :
ALL
 27-34-00


R 
AIJ




Page 564
May 01/10

2
_

The abutment block (8) must touch the rib (7).

3
_

The stop (4) must touch the elevator hinge bearing (5).

(d) Install the pin (2) through the side plates (6) and the stop (4).
(e) Install the wedge (3) through the side plates (6).
(f) Put the gauge (12) (5th mark) between the setting bar (10) and
the abutment block (8).
(g) Turn the adjuster knob (11) to lower the setting bar (10) until:
1
_

The pad (9) touches the THS.

2
_

The bottom of the setting bar (10) is to be 5 mm (0.1968 in.)


from the abutment block (8).

(8) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER


(98D27303000001) at the trailing edge of the elevator, between the
two servocontrols.
4. Procedure
_________
Subtask 27-34-00-820-063
A. Adjustment of the Inboard Servocontrol of the Right Elevator.
(1) On the maintenance panel 50VU, release the HYD/LEAK MEASUREMENT
VALVES/G and HYD/LEAK MEASUREMENT VALVES/B pushbutton switches. (the
OFF legends of the HYD/LEAK MEASUREMENT VALVES/G and HYD/LEAK
MEASUREMENT VALVES/B come on).
NOTE : At this step, the inboard servocontrol (Yellow) is in the
____
active mode; the outboard servocontrol (Blue) is in the
damping mode.
(2) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_
R

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.



EFF :
ALL
 27-34-00



AIJ




Page 565
Nov 01/10

2
_
R

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(3) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(4) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R

(5) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(6) Put the gauge (12) between the upper surface of the elevator and the
bottom of the setting bar (10). The neutral position indication is 5
plus or minus 0.5.
(7) If not, adjust the inboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).



EFF :
ALL
 27-34-00



AIJ




Page 566
Nov 01/10

(d) Turn the rod (4) (in the correct direction) until the upper
surface of the elevator touches the gauge (12) at 5 mm position.
(e) Engage the lock washer (3).
(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the torque does not change the adjustment.
(8) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309002000).
(9) Adjust the right Yellow inboard servocontrol to the new neutral
position:
(Ref. Fig. 508/TASK 27-34-00-991-010)
(a) On the tail cone, record the position of the elevator, and
identify it as the nominal position.
(b) On the tail cone, mark the new elevator neutral position at 9
+0.5 -0.5 mm (0.3543 +0.0196 -0.0196 in.) above the nominal
position as recorded before.
(c) Loosen the lock nut (2).
(d) Disengage the lock washer (3).
(e) Turn the rod (4) (in the correct direction), until the pointer is
aligned with the new elevator position mark on the tail cone.
(Ref. Fig. 508/TASK 27-34-00-991-010)
(f) Engage the lock washer (3).
(g) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(h) Make sure that the torque does not change the adjustment.
(i) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(10) Make sure that you can engage/disengage the rigging pin easily
into/from the elevator position transducer-unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)
NOTE : The rigging pin is part of the transducer-unit.
____



EFF :
ALL
 27-34-00


R 
AIJ




Page 567
May 01/10

If you cannot, adjust the length of the control rod (4):


(a) Cut and discard the lockwire from the nut (2) (transducer unit
side).
(b) Remove the bonding lead from the lock washer (4).
(c) Loosen the nuts (2).
(d) Disengage the lock washers (3).
(e) Turn the control rod body (4) until you can engage freely the
rigging pin in the transducer unit (1).
(f) Engage the lock washers (3) and tighten the nut (2) on the rod
(4).
(g) Make sure that you can engage/disengage freely the rigging pin
into from the elevator position transducer-unit (1).
(h) On the upper ECAM display unit, make sure that the ELAC 2 PITCH
FAULT warning is not shown.
(i) Safety the nut (2) (transducer unit side) with lockwire-corrosion
resistant steel dia 0.8 mm (0.0314 in.).
(j) Install the bonding lead on the washer (3).
Subtask 27-34-00-869-096
B. Servoing Change
(1) On the maintenance panel 50VU, push the HYD/LEAK MEASUREMENT VALVES/B
and release the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switches.
(the OFF legends of the HYD/LEAK MEASUREMENT VALVES/B goes off, the
HYD/LEAK MEASUREMENT VALVES/Y comes on).
(2) On the overhead panel 24VU:
(a) Release the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(3) On the overhead panel 23VU:
(a) Push the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on
these pushbutton switches, the OFF legends are off).



EFF :
ALL
 27-34-00


R 
AIJ




Page 568
May 01/10

(b) Make sure that the F/CTL ELAC 1 PITCH FAULT warning is not shown
on the upper ECAM display unit.
Subtask 27-34-00-820-067
C. Adjustment of the Outboard Servocontrol of the Right Elevator
NOTE : At this step, the inboard servocontrol (Yellow) is in the damping
____
mode. The outboard servocontrol (Blue) is in the active mode.
(1) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(2) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(3) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11) , the new cotterpin (10) or lockwasher
(15).

R
R



EFF :
ALL
 27-34-00



AIJ




Page 569
Nov 01/10

(4) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(5) Remove the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001).
NOTE : Use the new elevator neutral position written on the tail cone
____
to do the adjustment.
(Ref. Fig. 508/TASK 27-34-00-991-010)
(6) Adjust the outboard servocontrol to the new neutral position:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove and discard the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until:
1
_

The pointer on the trailing edge of the elevator is in line


with the mark made before on the adhesive tape.

2
_

You can easily engage/disengage the rigging pin into/from the


elevator position transducer-unit (1).

(e) Engage the lock washer (3).


(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(h) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(i) Remove the adhesive paper tape.
(j) Install a new reference triangle (8) on the tail cone with its
center in line with the pointer on the trailing edge of the
elevator (Ref. TASK 11-00-00-960-001).



EFF :
ALL
 27-34-00


R 
AIJ




Page 570
May 01/10

(k) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864003).


Subtask 27-34-00-480-060
D. Installation of the Tools
(1) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309002000) on the
left side:
(Ref. Fig. 509/TASK 27-34-00-991-008)
(a) Remove the pin (2) and the wedge (3) from the side plates (6).
(b) Turn the adjuster knob (11) counterclockwise until the setting
bar (10) is in its highest position.
(c) Install the tool (1) on the hinge bearing of the elevator and
THS:
- the rib (7) must be between the side plates (6).
- the abutment block (8) must touch the rib (7).
- the stop (4) must touch the elevator hinge bearing (5).
(d) Install the pin (2) through the side plates (6) and the stop (4).
(e) Install the wedge (3) through the side plates (6).
(f) Put the gauge (12) (5th mark) between the setting bar (10) and
the abutment block (8).
(g) Turn the adjuster knob (11) to lower the setting bar (10) until:
1
_

The pad (9) touches the THS.

2
_

The bottom of the setting bar (10) is to be 5 mm (0.1968 in.)


from the abutment block (8).

(2) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER


(98D27303000001) at the trailing edge of the elevator between the two
servocontrols.
(3) Remove the pointer of the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) from the right side and install it on the
left side, on the trailing edge of the elevator, in front of the tail
cone.
(Ref. Fig. 508/TASK 27-34-00-991-010)



EFF :
ALL
 27-34-00


R 
AIJ




Page 571
May 01/10

R
R

(4) Install an adhesive paper tape on the tail cone in front of the
pointer .
Subtask 27-34-00-820-068
E. Adjustment of the Inboard Servocontrol of the Left Elevator
(1) On the maintenance panel 50VU, push the HYD/LEAK MEASUREMENT VALVES/G
pushbutton switch. (the OFF legend of the HYD/LEAK MEASUREMENT
VALVES/G goes off).

R
R

(2) On the overhead panel 23VU:


- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(3) On the overhead panel 24VU:
- push the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches (on
these pushbutton switches, the FAULT and OFF legends are off).
NOTE : At this step, the inboard servocontrol (Green) is in the
____
active mode; the outboard servocontrol (Blue) is in the
damping mode.
(4) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.



EFF :
ALL
 27-34-00



AIJ




Page 572
Feb 01/11

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(5) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(6) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R

(7) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(8) Put the gauge (12) between the upper surface of the elevator and the
bottom of the setting bar (10). The neutral position indication is 5
plus or minus 0.5.
(9) If not, adjust the inboard servocontrol as follows:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(a) Remove the lockwire from the lock nut (2).
(b) Loosen the lock nut (2).
(c) Disengage the lock washer (3).
(d) Turn the rod (4) (in the correct direction) until the upper
surface of the elevator touches the gauge (12) at 5 mm position.
(e) Engage the lock washer (3).
(f) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(g) Make sure that the torque does not change the adjustment.
(10) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309002000).



EFF :
ALL
 27-34-00



AIJ




Page 573
Nov 01/10

(11) Adjust the left Green inboard servocontrol to the new neutral
position:
(Ref. Fig. 508/TASK 27-34-00-991-010)
(a) On the tail cone, record the position of the elevator, and
identify it as the nominal position.
(b) On the tail cone, mark the new elevator neutral position at 9
+0.5 -0.5 mm (0.3543 +0.0196 -0.0196 in.) above the nominal
position as recorded before.
(c) Loosen the lock nut (2).
(d) Disengage the lock washer (3).
(e) Turn the rod (4) (in the correct direction), until the pointer is
aligned with the new elevator position mark on the tail cone.
(Ref. Fig. 508/TASK 27-34-00-991-010)
(f) Engage the lock washer (3).
(g) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and
25.81 lbf.ft)
(h) Make sure that the torque does not change the adjustment.
(i) Safety the lock nut (2) with Lockwire-corrosion resistant steel
dia 0.8 mm (0.03 in.).
(12) Make sure that you can engage/disengage the rigging pin easily
into/from the elevator position transducer-unit (1).
(Ref. Fig. 503/TASK 27-34-00-991-009)
NOTE : The rigging pin is a part of the transducer-unit.
____
If you cannot, adjust the length of the control rod (4) as follows:
(a) Cut and discard the lockwire from the nut (2) (transducer unit
side).
(b) Remove the bonding lead from the lock washer (3).
(c) Loosen the nuts (2).
(d) Disengage the lock washers (3).



EFF :
ALL
 27-34-00


R 
AIJ




Page 574
May 01/10

(e) Turn the control rod body (4) until you can engage freely the
rigging pin in the transducer unit (1).
(f) Engage the washers (3) and tighten the nuts (2) on the rod (4).
(g) Make sure that you can engage/disengage freely the rigging pin
into/from the elevator position transducer-unit (1).
(h) On the upper ECAM display unit, make sure that the ELAC 2 PITCH
FAULT warning is not shown.
(i) Safety the nut (2) (transducer unit side) with lockwire-corrosion
resistant steel dia 0.8 mm (0.0314 in.).
(j) Install the bonding lead on the washer (3).
Subtask 27-34-00-869-095
F. Servoing Change
(1) On the maintenance panel 50VU, push the HYD/LEAK MEASUREMENT VALVES/B
pushbutton switch and release the HYD/LEAK MEASUREMENT VALVES/G
pushbutton switch. (the OFF legend of the HYD/LEAK MEASUREMENT
VALVES/B pushbutton switch goes off, the OFF legend of the HYD/LEAK
MEASUREMENT VALVES/G pushbutton switch comes on).
(2) On the overhead panel 24VU:
(a) Release the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton switches
(on these pushbutton switches, the OFF legends come on).
(3) On the overhead panel 23VU:
(a) Push the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches (on
these pushbutton switches, the OFF legends are off).
(b) Make sure that the F/CTL ELAC 1 PITCH FAULT warning is not shown
on the upper ECAM display unit.



EFF :
ALL
 27-34-00


R 
AIJ




Page 575
May 01/10

Subtask 27-34-00-820-065
G. Adjustment of the Outboard Servocontrol of the Left Elevator
NOTE : At this step, the inboard servocontrol (Green) is in the damping
____
mode. The outboard servocontrol (Blue) is in the active mode.
(1) To take up the play of the servocontrol attachment:
(a) At the servocontrol-to-elevator attachment:
(Ref. Fig. 506/TASK 27-34-00-991-020)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (10).
- remove the locking cup (11).
- loosen the nut (12) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove and discard the cotter pin (17).
- remove the lockwasher (15).
- loosen the nut (16) but do not remove it.

(b) At the servocontrol-to-THS attachment:


(Ref. Fig. 507/TASK 27-34-00-991-021)
1
_

If the servocontrol is locked with ABS safety system:


- remove and discard the cotter pin (20).
- remove the locking cup (21).
- loosen the nut (22) but do not remove it.

2
_

If the servocontrol is locked with STA-LOK safety system:


- remove the lockwasher (24).
- loosen the nut (25) but do not remove it.

(2) Apply a force of 20 +10 -10 daN (44.9617 +22.4808 -22.4808 lbf) with
the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER (98D27303000001)
in the down direction.
(3) At the servocontrol-to-elevator attachment:
- TORQUE the nuts (12) or (16) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (11), the new cotterpin (10) or lockwasher
(15).

R
R



EFF :
ALL
 27-34-00



AIJ




Page 576
Nov 01/10

(4) At the servocontrol-to-THS attachment:


- TORQUE the nuts (22) or (25) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft) while you keep the force to the down direction,
then release the force.
- Install the locking cup (21) and new cotter pin (20) or lockwasher
(24).
(5) Remove the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001).
NOTE : Use the new elevator neutral position written on the tail cone
____
to do the adjustment.
(Ref. Fig. 508/TASK 27-34-00-991-010)
If not, adjust the outboard servocontrol:
(Ref. Fig. 502/TASK 27-34-00-991-001)
(6) Remove and discard the lockwire from the lock nut (2).
(7) Loosen the lock nut (2).
(8) Disengage the lock washer (3).
(9) Turn the rod (4) (in the correct direction) until:
(a) The pointer on the trailing edge of the elevator is in line with
the mark made before on the adhesive tape.
(b) You can easily engage/disengage the rigging pin into/from the
elevator position transducer-unit (1).
(10) Engage the lock washer (3).
(11) TORQUE the lock nut (2) to between 3 and 3.5 m.daN (22.12 and 25.81
lbf.ft)
(12) Make sure that the adjustment does not change when you TORQUE the
lock nut.
(13) Safety the lock nut (2) with Lockwire-corrosion resistant steel dia
0.8 mm (0.03 in.).
(14) Remove the adhesive paper tape.
(15) Install a new reference triangle (8) on the tail cone with its center
in line with the pointer on the trailing edge of the elevator
(Ref. TASK 11-00-00-960-001).



EFF :
ALL
 27-34-00


R 
AIJ




Page 577
May 01/10

(16) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).


Subtask 27-34-00-710-058
H. Test
(1) Preparation for the test
(a) Removal of the tools
1
_

Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) from the screwjack of the THS actuator (6).
(Ref. Fig. 502/TASK 27-34-00-991-001)

2
_

Remove the pointer of the LOAD,APPLICATION TOOL-ELEVATOR,


AILERON, RUDDER (98D27303000001).

3
_

Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the


CAPT and F/O side sticks.

(b) On the overhead panel 24VU:


1
_

Push the FLT CTL/ELAC 2 and FLT CTL/SEC2 pushbutton switches


(on these pushbutton switches, the OFF legends go off).

(2) Do the operational test of the elevators (Ref. TASK 27-34-00-710001).


5. Close-up
________
Subtask 27-34-00-860-074
A. Put the Aircraft back to its Initial Configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Remove the warning notice(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 578
May 01/10

Subtask 27-34-00-410-064
B. Close Access.
(1) Close the access door 312AR.
(2) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334DB, 334AT 334BB for the left elevator.
(b) 344DB, 344AT 344BB for the right elevator.
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822 (Ref. TASK 52-41-00-410-002).
(6) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 579
May 01/10

TASK 27-34-00-760-001
Electrical Test of the Elevator Servo Controls
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
To confirm the cause of an elevator servocontrol fault (flight control
computer, aircraft wiring or servocontrol).
In this procedure, you will interchange the wiring between two servocontrols
(the one that you think is unserviceable and one that you know is
serviceable).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
99D27303500000

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
3 WARNING NOTICE(S)
1 SWITCH SERV. CTL ELEV



EFF :
ALL
 27-34-00



AIJ




Page 580
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-96-00-710-020
27-96-00-740-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001

Operational Test of the Side Stick Assembly


(Activation for the BITE Test)
BITE Test of the EFCS (Ground Scanning)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels

3. __________
Job Set-up
Subtask 27-34-00-860-079
A. Aircraft Maintenance Configuration
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
Subtask 27-34-00-865-065
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-34-00


R 
AIJ




Page 581
May 01/10

Subtask 27-34-00-941-070
C. Safety Precautions
R

(1) Put a WARNING NOTICE(S) in position to tell persons not to use these
controls:
- The CAPT and F/O side sticks
- The pitch trim control-wheels.
(2) Put WARNING NOTICES in position to tell persons not to operate the
hydraulic systems.
Subtask 27-34-00-010-069
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
334 and zone 344.
(2) Open the trailing edge access-panels 334DB and 344DB (Ref. TASK 5513-11-000-001).
Subtask 27-34-00-480-062
E. Installation of the Tool
(1) If the fault is on the servocontrol:
(a) For 34CE1 or 34CE2:
- Disconnect the electrical connectors 34CE1-A, 34CE1-B, 34CE1-C,
49CE1, 34CE2-A, 34CE2-B, 34CE2-C and 49CE2.
(b) For 34CE3 or 34CE4:
- Disconnect the electrical connectors 34CE3-A, 34CE3-B, 34CE3-C,
49CE1, 34CE4-A, 34CE4-B, 34CE4-C and 49CE2.
(2) Connect the SWITCH SERV. CTL ELEV (99D27303500000) to the
disconnected electrical connectors.



EFF :
ALL
 27-34-00



AIJ




Page 582
Nov 01/10

Subtask 27-34-00-865-066
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
Subtask 27-34-00-760-050
A. Electrical Test of the Elevator Servo Controls
(1) Do the operational test of the side stick assembly (Activation for
the BITE test) (Ref. TASK 27-96-00-710-020).
(2) Do a BITE Test of the EFCS (Ground Scanning) (Ref. TASK 27-96-00-740001):
(a) If the fault is the same, do a check of the aircraft wiring and
of the flight control computer (Ref. TSM).
(b) If the fault is on the other side, replace the defective
servocontrol.



EFF :
ALL
 27-34-00


R 
AIJ




Page 583
May 01/10

5. Close-up
________
Subtask 27-34-00-865-067
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-080-056
B. Removal of the Tool
(1) Disconnect the SWITCH SERV. CTL ELEV (99D27303500000).
(2) Connect these electrical connectors:
(a) For the servocontrol 34CE1 or 34CE2:
- 34CE1-A, 34CE1-B, 34CE1-C, 49CE1, 34CE2-A, 34CE3-B, 34CE4-C and
49CE2.
(b) For the servocontrol 34CE3 or 34CE4:
- 34CE3-A, 34CE3-B, 34CE3-C, 49CE1, 34CE4-A, 34CE4-B, 34CE4-C and
49CE2.



EFF :
ALL
 27-34-00


R 
AIJ




Page 584
May 01/10

Subtask 27-34-00-865-068
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-410-067
D. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the trailing edge access-panels 334DB and 344DB (Ref. TASK 5513-11-400-001).
Subtask 27-34-00-942-075
E. Put the aircraft back to its initial configuration.
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-00



AIJ




Page 585
May 01/10

ELEVATOR AND HYDRAULIC ACTUATION - INSPECTION/CHECK


___________________________________________________
TASK 27-34-00-200-001
Check of the Elevator Servo Controls and Hinge Bearings for too much Play and
Condition
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 273400-02
To make sure that :
- The elevator servocontrol bearings and the hinge bearings that attach the
elevators to the structure are in good condition.
To measure the play at the trailing edge of the elevators.

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
97A27003000007
98D27303000001
98D27303003001
98D27303022000
98D27403500000
98D27903500000

1
1
3
1
1
1
1
1
2

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
WARNING NOTICE(S)
GAGE,ASSY-PUSH-PULL
LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
PITCH TRIM CONTROL LOCKING
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-00



AIJ




Page 601
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-00-200-002
27-34-51-000-001
27-34-51-200-001
27-34-51-400-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
55-16-42-000-001
55-16-42-400-001
55-26-00-200-002
27-34-00-991-014
27-34-00-991-002
27-34-00-991-024
27-34-00-991-025

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Elevator Servo Control Oscillations.
Removal of the Elevator Servo Control
In Service Wear Limits of the Elevator Servo-Control
Attach-Fittings
Installation of the Elevator Servo Control
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Removal of the Elevator Hinge Arm End Fittings
Installation of the Elevator Hinge Arm End Fittings
Check of Elevator Attachment Fittings for wear, LH/RH
Fig. 601
Fig. 602
Fig. 603
Fig. 604

3. __________
Job Set-up
Subtask 27-34-00-860-060
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002)
(2) On the overhead panel 20VU, make sure that:
- The 3 OFF/NAV/ATT selector switches are in OFF position.



EFF :
ALL
 27-34-00



AIJ




Page 602
Aug 01/11

(3) On the panel 23VU, make sure that the FLT CTL/ELAC 1 pushbutton
switch is pushed (the OFF and FAULT legends are off).
(4) On the panel 24VU, make sure that the FLT CTL/ELAC 2 pushbutton
switch is pushed (the OFF and FAULT legends are off).
Subtask 27-34-00-010-063
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the
access door 822.
(a) Open the access door 822.
(b) On the battery power center 105VU:
- Loosen the two screws and remove the protective cover.

(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position:


R

(a) At zone 334 for the left elevator.

(b) At zone 344 for the right elevator.


(3) Open the THS trailing edge access-panels (Ref. TASK 55-13-11-000001):
(a) 334BB, 334DB, 334FB, 334HB for the left elevator.
(b) 344BB, 344DB, 344FB, 344HB for the right elevator.
Subtask 27-34-00-865-052
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-34-00



AIJ




Page 603
Aug 01/11

Subtask 27-34-00-481-050

D. Installation of the Safety Devices

R
R

(1) Put the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and F/O
side sticks.

R
R

(2) Put the PITCH TRIM CONTROL LOCKING (98D27403500000) on the pitch-trim
control wheel.

R
R
R
R

(3) Put the WARNING NOTICE(S) in position to tell persons not to use
these controls:
- The CAPT and F/O side sticks
- The pitch-trim control wheels.
Subtask 27-34-00-863-055

E. Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863-001)


(Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
Subtask 27-34-00-480-050

F. Installation of the Tools


(1) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
(2) Install the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001) as follows:
- At the trailing edge of the elevator
- Between the two servocontrols.

R
R

(3) Install the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER


(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) on the trailing edge of the elevator.
NOTE : Clean and make the tail-cone upper surface moist before you
____
attach the tool.
NOTE : With the CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
____
(98D27303022000), you can use the auto-record function. For
more information about the auto-record function, refer to the
manufacturers instruction manual.
R
(Ref. Fig. 601/TASK 27-34-00-991-014)
R



EFF :
ALL
 27-34-00



AIJ




Page 604
Aug 01/11

R
R

CHECK TOOL (DIGITAL) 98D27303022000 (Auto-recording Function)


Figure 601/TASK 27-34-00-991-014



EFF :
ALL
 27-34-00



AIJ




Page 605
Feb 01/07

4. Procedure
_________
(Ref. Fig. 602/TASK 27-34-00-991-002, 603/TASK 27-34-00-991-024, 604/TASK
27-34-00-991-025)
Subtask 27-34-00-210-050
A. Check of the Elevator Servocontrols and Hinge Bearings for General
Condition
(1) Make sure that the liner is in the correct position between the
attachment hardware of the bearings (no migration of the liner).
NOTE : The liner is a coat of teflon between the bearing case and the
____
ball. It lets the ball turn with a minimum of friction (self
lubricating).
If you can see the liner, replace the related servocontrol (Ref. TASK
27-34-51-000-001) (Ref. TASK 27-34-51-400-001) or hinge arm
end-fitting (Ref. TASK 55-16-42-000-001) (Ref. TASK 55-16-42-400001).
Subtask 27-34-00-220-052
B. Check of the Elevators for too much Play
NOTE : For monitoring and follow up of the play at the elevator trailing
____
edge, we recommend that the operators record the measured values
in their documentation.
(1) On the maintenance panel 50VU, release the HYD LEAK MEASUREMENT/B
pushbutton switch (the OFF legend comes on).
NOTE : At this time, the inboard servocontrols are pressurized:
____
- By the Green hydraulic system for the left elevator.
- By the Yellow hydraulic system for the right elevator.

R
R

NOTE : If you see oscillations when the servocontrol is in active


____
mode, do a check of these oscillations.(Ref. TASK 27-34-00200-002)
NOTE : The check is only given for one surface. Do the same
____
operations for the other surface.
(2) On the LOAD,APPLICATION TOOL-ELEVATOR, AILERON, RUDDER
(98D27303000001), connect the GAGE ASSY - PUSH-PULL TOOL GAGE,ASSYPUSH-PULL (97A27003000007) (or equivalent).



EFF :
ALL
 27-34-00



AIJ




Page 606
Aug 01/11

R
R

Adjustment of the Elevators


Figure 602/TASK 27-34-00-991-002



EFF :
ALL
 27-34-00



AIJ




Page 607
Feb 01/07

R
R

Elevator Trailing Edge Play - Check List


Figure 603/TASK 27-34-00-991-024



EFF :
ALL
 27-34-00



AIJ




Page 608
May 01/11

R
R

Elevator Trailing Edge Play - Measurement


Figure 604/TASK 27-34-00-991-025



EFF :
ALL
 27-34-00



AIJ




Page 609
May 01/11

(3) Apply a stable load of 30 daN (67.4426 lbf) in the up direction on


the trailing edge.
(4) Keep this load applied and set the dial gage to zero.
(5) Release the load.
(6) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the down direction on the trailing edge.
(7) Keep this load applied and record the value shown on the dial gage.
(8) Release the load.
(9) If the distance is more than 7 mm (0.2755 in.) between the two
positions:
(a) For the left elevator:
1
_

Replace the Green elevator servocontrol (Ref. TASK 27-34-51000-001) (Ref. TASK 27-34-51-400-001).

2
_

If the distance stays more than 7 mm (0.2755 in.) do a check


of the Green elevator servocontrol fitting (Ref. TASK 27-3451-200-001).

3
_

If the distance stays more than 7 mm (0.2755 in.) do an


inspection/check of the elevator attach fittings (Ref. TASK
55-26-00-200-002).
NOTE : This 7 mm (0.2755 in.) value includes 4 mm (0.1574 in.)
____
of surface bending with 30 daN (67.4426 lbf) load
applied .

(b) For the right elevator:


1
_

Replace the Yellow elevator servocontrol (Ref. TASK 27-34-51000-001) (Ref. TASK 27-34-51-400-001).

2
_

If the distance stays more than 7 mm (0.2755 in.) do a check


of the Yellow elevator servocontrol fitting (Ref. TASK 27-3451-200-001).

3
_

If the distance stays more than 7 mm (0.2755 in.) do an


inspection/check of the elevator attach fittings (Ref. TASK
55-26-00-200-002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 610
Aug 01/11

NOTE : This 7 mm (0.2755 in.) value includes 4 mm (0.1574 in.)


____
of surface bending with 30 daN (67.4426 lbf) load
applied .
(10) On the maintenance panel 50VU :
(a) Release the HYD LEAK MEASUREMENT/G pushbutton switch (the OFF
legend comes on).
(b) Release the HYD LEAK MEASUREMENT/Y pushbutton switch (the OFF
legend comes on).
(c) Push the HYD LEAK MEASUREMENT/B pushbutton switch (the OFF legend
goes off).
NOTE : At this time, the outboard servocontrols are pressurized:
____
- By the Blue hydraulic system for the left and right
elevators.

R
R

(11) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the up direction on the trailing edge.
(12) Keep this load applied and set the dial gage to zero.
(13) Release the load.
(14) At the same position, apply a stable load of 30 daN (67.4426 lbf) in
the down direction on the trailing edge.
(15) Keep this load applied and record the value shown on the dial gage.
(16) Release the load.
(17) If the distance is more than 7 mm (0.2755 in.) between the two
positions:
(a) Replace the Blue elevator servocontrol (Ref. TASK 27-34-51-000001) (Ref. TASK 27-34-51-400-001).
(b) If the distance stays more than 7 mm (0.2755 in.) do a check of
the Blue elevator servocontrol fitting (Ref. TASK 27-34-51-200001).



EFF :
ALL
 27-34-00



AIJ




Page 611
Aug 01/11

(c) If the distance stays more than 7 mm (0.2755 in.) do a check of


the elevator fitting (Ref. TASK 55-26-00-200-002).
NOTE : This 7 mm (0.2755 in.) value includes 4 mm (0.1574 in.) of
____
surface bending with 30 daN (67.4426 lbf) load applied .
5. Close-up
________
Subtask 27-34-00-080-050
A. Removal of the Tools
(1) Remove the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) , the GAGE ASSY - PUSH-PULL TOOL GAGE,ASSY-PUSH-PULL
(97A27003000007) and the LOAD,APPLICATION TOOL-ELEVATOR, AILERON,
RUDDER (98D27303000001) from the elevator.
R
R

(2) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-00-860-061
B. Put the Aircraft back to its Initial Configuration
(1) On the maintenance panel 50VU :
(a) Push the HYD LEAK MEASUREMENT/G pushbutton switch (the OFF legend
goes off).
(b) Push the HYD LEAK MEASUREMENT/Y pushbutton switch (the OFF legend
goes off).
(2) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00



AIJ




Page 612
Aug 01/11

Subtask 27-34-00-081-050

C. Removal of the Safety Devices

R
R

(1) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O sidestick controllers.

R
R

(2) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the
pitch-trim control wheel.

(3) Remove the WARNING NOTICE(S).


Subtask 27-34-00-410-054

D. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Close the THS trailing edge access panels (Ref. TASK 55-13-11-400001):
(a) 334BB, 334DB, 334FB, 334HB for the left elevator.
(b) 344BB, 344DB, 344FB, 344HB for the right elevator.
(5) Remove the access platform(s).



EFF :
ALL
 27-34-00



AIJ




Page 613
Aug 01/11

TASK 27-34-00-220-001
Check of the Position of the Fluid-Reserve Piston of the Elevator Servo Control
with the Hydraulic Reservoirs Depressurized
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 273400-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27903500000

rule
warning notice
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
2 PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-14-00-614-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs



EFF :
ALL
 27-34-00


R 
AIJ




Page 614
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-14-00-614-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
27-34-00-991-005

Pressurization of the Hydraulic Reservoirs through


the Ground Connector
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 605

3. __________
Job Set-up
Subtask 27-34-00-010-057
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.
(2) Open the THS trailing edge access panels 334DB, 344DB (Ref. TASK 5513-11-000-001).
Subtask 27-34-00-865-063
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM
1GA
C09
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34



EFF :
ALL
 27-34-00



AIJ




Page 615
May 01/11

Subtask 27-34-00-860-050
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 20VU, make sure that:
- the 3 OFF/NAV/ATT selector switches are in OFF position.
(3) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
(4) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(5) On each servo control (1), make sure that the indicator of the
fluid-reserve (2) piston is in the maximum extended position.
(Ref. Fig. 605/TASK 27-34-00-991-005)

(6) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(7) Depressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-001).
(8) Put warning notices in position to tell persons not to pressurize the
hydraulic systems:
- in the cockpit, on the HYD overhead panel 40VU,
- on the ground service panels.
(9) Put a warning notice on the access door 195BB to tell persons not to
pressurize the hydraulic reservoirs.
(10) Install the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and
F/O side sticks.
(11) Put a warning notice on the CAPT and F/O side sticks to tell persons
not to touch the side sticks.
(12) Put a warning notice on the pitch-trim control wheels to tell
persons, not to use the pitch trim.



EFF :
ALL
 27-34-00



AIJ




Page 616
May 01/11

Elevator Servo Control


Figure 605/TASK 27-34-00-991-005



EFF :
ALL
 27-34-00



AIJ




Page 617
May 01/11

4. Procedure
_________
Subtask 27-34-00-220-054
A. Check of the Position of the Fluid-Reserve Piston of the Elevator Servo
Control with the Hydraulic Reservoirs Depressurized
(Ref. Fig. 605/TASK 27-34-00-991-005)

(1) After three hours, on the fluid reserve (2), with a rule make sure
that:
- If the indicator retracts more than 32 mm (1.2598 in.), the
pressure and return line closing valves are not sealed. You must
remove the servo control (1) for repair.
5. Close-up
________
Subtask 27-34-00-410-057
A. Close Access
(1) Close the THS trailing edge access panels 334DB, 344DB (Ref. TASK 5513-11-400-001).
(2) Remove the access platform(s).
Subtask 27-34-00-860-051
B. Put the Aircraft Back to its Initial Configuration
(1) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O side sticks.
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Remove the warning notice(s).
(4) Pressurize the hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00



AIJ




Page 618
May 01/11

TASK 27-34-00-220-002
Check of the Differential-Pressure Indicator and of the Position of the FluidReserve Piston of the Elevator Servo Controls
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 273400-04
This task is only applicable for the elevator servocontrols P/N 31075-2XX or
P/N 31075-4XX.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
0U145914
98D27903500000

warning notice
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 DRAINING TOOL
2 PIN-SIDE STICK LOCKING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

lockwire 0.8 mm



EFF :
ALL
 27-34-00


R 
AIJ




Page 619
May 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------5
8

seal
cotter pin

27-34-51 01A-157
27-34-51 01A-160

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

R
R

29-24-00-864-001
55-13-11-000-001
55-13-11-400-001
27-34-00-991-006
27-34-00-991-007

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 606
Fig. 607

3. __________
Job Set-up
Subtask 27-34-00-860-062
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-34-00



AIJ




Page 620
May 01/11

(3) Install the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and
F/O side sticks.
(4) Put a warning notice on the CAPT and F/O side stick to tell persons
not to touch the side sticks.
(5) Put a warning notice on the pitch-trim control wheels to tell persons
not to use the pitch trim.
Subtask 27-34-00-010-058
B. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.
(2) Open the THS trailing edge access panels 334DB, 344DB (Ref. TASK 5513-11-000-001).
4. Procedure
_________
R

(Ref. Fig. 606/TASK 27-34-00-991-006, 607/TASK 27-34-00-991-007)


Subtask 27-34-00-210-052
A. Check of the Differential-Pressure Indicator and of the Position of the
Fluid-Reserve Piston of the Elevator Servo Controls
(1) On each servo control (1), make sure that the indicator of the
fluid-reserve (2) piston is in the maximum extended position.
(2) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) Put the warning notices in position to tell persons not to pressurize
the hydraulic systems :
(a) In the cockpit, on the HYD section of the overhead panel 40VU.
(b) On the ground service panels of the hydraulic systems.
(4) Remove the protective plug from the differential pressure sensor (3).
(5) Cut and discard the lockwire on the protective plug (6) of the drain
system (4).
(6) Remove the cotter pin (8), the washer (7) and the protective plug (6)
of the drain system (4).



EFF :
ALL
 27-34-00



AIJ




Page 621
May 01/11

Elevator Servo Control


Figure 606/TASK 27-34-00-991-006



EFF :
ALL
 27-34-00



AIJ




Page 622
May 01/11

Differential Pressure Sensor and Drain System


Figure 607/TASK 27-34-00-991-007



EFF :
ALL
 27-34-00



AIJ




Page 623
May 01/11

(7) Remove the obturator (5) and its seal.


(8) Install the DRAINING TOOL (0U145914) on the drain system (4).
(9) Drain the fluid reserve (2).
NOTE : When the fluid drains, make sure that the position indicator
____
of the fluid- reserve (2) piston moves continuously to maximum
retracted position.
Make sure that it stays in the retracted position.
If not, remove the servo control (1) for repair.
(10) Remove the DRAINING TOOL (0U145914).
(11) Push in the indicator of the differential pressure sensor (3).
(12) Make sure that it stays pushed in.
If not, remove the servo control (1) for repair.
(13) Pressurize the hydraulic systems (Ref. TASK 29-23-00-863-001)
(Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(14) Make sure that :
- the indicator of the fluid-reserve (2) piston,
- the indicator of the differential pressure sensor (3)
are in the extended position.
If not, remove the servo control (1) for repair.
(15) Install the protective plug on the differential pressure sensor (3).
(16) Install the obturator (5) and its seal.
NOTE : Make sure that the seal is in good condition, if not replace
____
it seal (5).
(17) Install the protective plug (6) on the drain system (4).
(18) Install the washer (7) and the new cotter pin (8).
(19) Secure with the lockwire 0.8 mm the protective plug (6) on the drain
system (4).



EFF :
ALL
 27-34-00


R 
AIJ




Page 624
May 01/11

5. Close-up
________
Subtask 27-34-00-860-063
A. Put the aircraft back to its initial configuration.
(1) Depressurize the hydraulic systems (Ref. TASK 29-23-00-864-001)
(Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Make sure that the level of hydraulic fluid in the (Green, Blue and
Yellow) reservoirs is correct.
Fill the reservoirs if necessary (Ref. TASK 12-12-29-611-001).
(3) Remove the warning notice(s).
(4) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O side sticks.
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-34-00-410-058
B. Close Access
(1) Close the THS trailing edge access panels 334DB, 344DB (Ref. TASK 5513-11-400-001).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 625
May 01/11

TASK 27-34-00-200-002
Check of the Elevator Servo Control Oscillations.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27303003001
98D27303022000
98D27903500000

1
1
1
2

warning notices
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-51-000-008
27-34-51-400-003
29-10-00-863-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Elevator Servo Control Actuator Servo
Valve
Installation of the Elevator Servo Control Actuator
Servo Valve
Pressurize the Green Hydraulic System



EFF :
ALL
 27-34-00


R 
AIJ




Page 626
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-003
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
27-93-34-000-001
27-93-34-400-001

Pressurize the Blue Hydraulic System with a Ground


Power Supply
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the ELAC (2CE1,2CE2) (for corrective
action)
Installation of the ELAC (2CE1,2CE2) (for corrective
action)

3. __________
Job Set-up
Subtask 27-34-00-860-058
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Put the PIN-SIDE STICK LOCKING (98D27903500000) on the CAPT and F/O
side sticks.
(3) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(4) Put the warning notices on the center pedestal, to tell persons not
to touch the pitch-trim control wheel.
(5) On the panel 23VU:
- make sure that the FLT CTL/ELAC 1 pushbutton switch is pushed (on
this pushbutton switch, the OFF and FAULT legends are off).
(6) On the panel 24VU:
- make sure that the FLT CTL/ELAC 2 pushbutton switch is pushed (on
this pushbutton switch, the OFF and FAULT legends are off).
(7) Pressurize the Green hydraulic system
(Ref. TASK 29-10-00-863-001).



EFF :
ALL
 27-34-00


R 
AIJ




Page 627
May 01/11

Subtask 27-34-00-480-053
B. Installation of the Tools
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE at zone 334 (344).
(2) Install the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) on the rear cone, near the trailing edge of the
elevator (left or right side).
(3) Put the pointer of the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000) at the trailing edge of the elevator.
4. Procedure
_________
Subtask 27-34-00-220-056
A. Check of the Oscillation of the Servo Control of the Left Elevator
(1) On the dial indicator, measure the amplitude of the oscillations.
If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (34CE1) (Ref. TASK 27-34-51-000-008),
(Ref. TASK 27-34-51-400-003).
If the fault continues, replace the ELAC2 (2CE2) (Ref. TASK 27-93-34000-001) and (Ref. TASK 27-93-34-400-001)
(2) Depressurize the Green hydraulic system (Ref. TASK 29-23-00-864-001).
(3) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003). On
the dial indicator, measure the amplitude of the oscillations.
If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (34CE3)(Ref. TASK 27-34-51-000-008),
(Ref. TASK 27-34-51-400-003).
If the fault continues, replace the ELAC1 (2CE1) (Ref. TASK 27-93-34000-001) and (Ref. TASK 27-93-34-400-001).
NOTE: If the check is done with SECs engaged instead of ELACs, the
maximum amplitude will be:
- 3 mm for pitch up order
- 2 mm for pitch down order.



EFF :
ALL
 27-34-00


R 
AIJ




Page 628
May 01/11

Subtask 27-34-00-220-057
B. Check of the Oscillation of the Servo Control of the Right Elevator
(1) On the dial indicator, measure the amplitude of the oscillations.
(2) If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (34CE4)(Ref. TASK 27-34-51-000-008),
(Ref. TASK 27-34-51-400-003).
If the fault continues, replace the ELAC 1 (2CE1) (Ref. TASK 27-9334-000-001) and (Ref. TASK 27-93-34-400-001).
(3) Depressurize the Blue hydraulic system (Ref. TASK 29-24-00-864-001).
(4) Pressurize the Yellow hydraulic system (Ref. TASK 29-24-00-863-001).
(5) If the amplitude is more than 1 mm (0.0393 in.), replace the
servovalve of the servo control (34CE2) (Ref. TASK 27-34-51-000-008),
(Ref. TASK 27-34-51-400-003).
If the fault continues, replace the ELAC 2 (2CE2) (Ref. TASK 27-9334-000-001) and (Ref. TASK 27-93-34-400-001).
NOTE: If the check is done with SECs engaged instead of ELACs, the
maximum amplitude will be:
- 3 mm for pitch up order
- 2 mm for pitch down order.
5. Close-up
________
Subtask 27-34-00-860-059
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Yellow hydraulic system (Ref. TASK 29-24-00-863001).
(2) Remove the CHECK TOOL (ANALOG)-AILERON,ELEVATOR,RUDDER
(98D27303003001) or CHECK TOOL (DIGITAL) - AILERON, ELEVATOR, RUDDER
(98D27303022000).
(3) Remove the PIN-SIDE STICK LOCKING (98D27903500000).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-34-00


R 
AIJ




Page 629
May 01/11

(5) Remove the maintenance equipment.


(a) Make sure that the work area is clean and clear of tool(s) and
other items.
(b) Remove the warning notice(s).
(c) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 630
May 01/11

TASK 27-34-00-220-003
Check of the Position of the Reference Triangle on the Tail Cone
1. __________________
Reason for the Job
To do a check of the position of the reference triangle on the tail cone.
NOTE : This task lets you know if the position of the reference triangle on
____
the tail cone is approximately correct. To do an accurate check of
the reference triangle position, it is necessary to use the
Gauge-Elevator Neutral Setting tool and the procedure given in AMM
task 273400-820-00300.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
98D27309002000
98D27309006000

2 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


1 GAUGE-ELEVATOR NEUTRAL SETTING
1 GAUGE-ELEVATOR NEUTRAL SETTING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-820-003
27-34-00-820-003
R

27-34-00-991-012

Adjustment of the Elevator and Hydraulic Actuation to


0.5 Degrees Nose-Up with the Gauge-Elevator Neutral
Setting (98D27309006000)
Adjustment of the Elevator and Hydraulic Actuation to
0.5 Degrees Nose-Up with the Gauge-Elevator Neutral
Setting (98D27309002000)
Fig. 608



EFF :
ALL
 27-34-00



AIJ




Page 631
May 01/11

3. __________
Job Set-up
Subtask 27-34-00-860-075
A. Aircraft Maintenance Configuration
(1) Put a warning notice in position in the cockpit to tell persons not
to pressurize the hydraulic systems.
Subtask 27-34-00-010-067
B. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position under the
left elevator.
4. Procedure
_________
R

(Ref. Fig. 608/TASK 27-34-00-991-012)


Subtask 27-34-00-220-058
A. Check of the Position of the Reference Triangle
(1) Make a mark at 780 mm (30.7086 in.) from the forward corner of the
APU access door 315AL.
(2) From this mark, measure the distance along the skin between the edge
of the stucture and the center of the triangle.
NOTE : The position of the triangle must be between 386 mm (15.1968
____
in.) and 402 mm (15.8267 in.).
(a) If the position of the triangle is not between these two values:
- do not adjust the elevators with the reference triangle
- adjust the elevators with the GAUGE-ELEVATOR NEUTRAL SETTING
(98D27309002000) or GAUGE-ELEVATOR NEUTRAL SETTING
(98D27309006000), (Ref. TASK 27-34-00-820-003) or (Ref. TASK
27-34-00-820-003).
(b) If the position of the triangle is between these two values:
- the position of the triangle is correct; no maintenance action
is necessary.
(3) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position under the
right elevator.



EFF :
ALL
 27-34-00



AIJ




Page 632
May 01/11

Triangle Reference on the Tail Cone


Figure 608/TASK 27-34-00-991-012



EFF :
ALL
 27-34-00



AIJ




Page 633
May 01/11

(4) Make a mark at 780 mm (30.7086 in.) from the forward corner of the
APU access door 316AR.
(5) From this mark, measure the distance along the skin between the edge
of the stucture and the center of the triangle.
NOTE : The position of the triangle must be between 386 mm (15.1968
____
in.) and 402 mm (15.8267 in.).
(a) If the position of the triangle is not between these two values:
- do not adjust the elevators with the reference triangle
- adjust the elevators with the GAUGE-ELEVATOR NEUTRAL SETTING
(98D27309002000) or GAUGE-ELEVATOR NEUTRAL SETTING
(98D27309006000), (Ref. TASK 27-34-00-820-003) or (Ref. TASK
27-34-00-820-003).
(b) If the position of the triangle is between these two values:
- the position of the triangle is correct; no maintenance action
is necessary.
5. Close-up
________
Subtask 27-34-00-410-065
A. Close Access
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-00


R 
AIJ




Page 634
May 01/11

TASK 27-34-00-280-001
Removal of the Elevator Servo Controls for Functional check of the return
relief valve in workshop
1. __________________
Reason for the Job
Refer to the MPD TASK: 273400-05
To make sure that the return relief valve operates correctly.
This task is only applicable for the elevator servocontrols P/N 31075-1XX or
P/N 31075-3XX.
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-51-000-001
27-34-51-400-001
CMM 273452

Removal of the Elevator Servo Control


Installation of the Elevator Servo Control

3. __________
Job Set-up
Subtask 27-34-00-020-052
A. Remove the elevator servo controls (Ref. TASK 27-34-51-000-001).
4. Procedure
_________
Subtask 27-34-00-280-050
A. Do a test of the return relief valve in the workshop (Ref. CMM 273452)
(Testing and Fault Isolation, Para. 4(a)) .
5. Close-up
________
Subtask 27-34-00-420-051
A. Install the elevator servo controls (Ref. TASK 27-34-51-400-001).



EFF :
ALL
 27-34-00


R 
AIJ




Page 635
May 01/11

TASK 27-34-00-200-003
Check of Elevator Neutral Position and Servo Control Installation
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Refer to the MPD TASK: 273400-06
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
0U190360
98D27309006000
98D27309009002
98D27309009003
98D27903500000

1
1
1
1
1
1
1
2

threaded pins
warning notice
warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
GAUGE-ELEVATOR NEUTRAL SETTING
COLLAR DEPTH ACTUATOR
COLLAR DEPTH ACTUATOR
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-00


R 
AIJ




Page 636
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-34-00-820-003
27-34-51-000-009
27-34-51-200-001
27-34-51-400-001
27-34-51-400-006
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

R
R
R
R
R

29-24-00-864-001
52-41-00-010-002
52-41-00-410-002
55-13-11-000-001
55-13-11-400-001
CMM 273452
27-34-00-991-015
27-34-00-991-016
27-34-00-991-017
27-34-00-991-018
27-34-00-991-019

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Adjustment of the Elevator and Hydraulic Actuation
with the Gauge-Elevator Neutral Setting
(98D27309002000)
Removal of the Servo Control Actuator Eye-End
In Service Wear Limits of the Elevator Servo-Control
Attach-Fittings
Installation of the Elevator Servo Control
Installation of the Servo Control Actuator Eye-End
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Open the Avionics Compartment Doors for Access
Close the Avionics Compartment Doors after Access
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
(for corrective action)
Fig. 609
Fig. 610
Fig. 611
Fig. 612
Fig. 613



EFF :
ALL
 27-34-00



AIJ




Page 637
May 01/11

3. __________
Job Set-up
Subtask 27-34-00-010-068
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in zone
312.
(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position in these
zones:
(a) 334 for the left elevator.
(b) 344 for the right elevator.
(3) Open the access door 312AR.
(4) Open the THS trailing-edge access-panels (Ref. TASK 55-13-11-000001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the
access door 822.
(6) Open the access door 822 (Ref. TASK 52-41-00-010-002).
(7) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.



EFF :
ALL
 27-34-00


R 
AIJ




Page 638
May 01/11

Subtask 27-34-00-865-064
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU L/G/LGCIU/SYS1/NORM
1GA
C09
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-00-860-076
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the overhead panel 20VU:
- make sure that the three OFF/NAV/ATT selector switches are in OFF
position.
(3) Make sure that hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-001), (Ref. TASK 29-10-00-864-002) and
(Ref. TASK 29-10-00-864-003).
(4) On the center pedestal, make sure that the pitch-trim control wheels
are set to 0.
(5) Put a warning notice on the pitch-trim control wheels to tell persons
not to move the THS.
(6) Safety the CAPT and F/O side sticks with the PIN-SIDE STICK LOCKING
(98D27903500000).
(7) Put warning notices on the CAPT and F/O side sticks to tell persons
not to move the side sticks.



EFF :
ALL
 27-34-00


R 
AIJ




Page 639
May 01/11

(8) Make sure that there is no warning related to the LGCIUs on the upper
ECAM display unit.
4. Procedure
_________
Subtask 27-34-00-200-050
A. Check of the Installation of the Servo Controls (34CE1, 34CE2, 34CE3,
34CE4)
(Ref. Fig. 609/TASK 27-34-00-991-015)

(1) Move the elevator by hand at the upper position and install the
COLLAR DEPTH ACTUATOR (98D27309009002) or COLLAR DEPTH ACTUATOR
(98D27309009003) on the servo control.
(2) Make sure that the installation of the servo-control actuator eye-end
is correct:
- Make sure that the key washer (3) is fully engaged on the
servo-control fitting (4).
- Make sure that the face serrations of the locking washer (2) and
the key washer (3) are fully engaged.
- Make sure that the torque value of the lock nut (1) is between 3
m.daN (22.12 lbf.ft) and 3.5 m.daN (25.81 lbf.ft).
(a) If one of the above points is not correct, do these steps:
1
_

Remove the servo-control actuator eye-end (Ref. TASK 27-34-51000-009).

2
_

Do an inspection of the threads of the eye-end for wear, marks


and scratches.

3
_

Do an inspection of the locking washer (2) and the key washer


(3) for wear on the face serrations.
a
_

If an item is not correct, you must repair the full unit


(Ref. CMM 273452).

b
_

If all items are correct, install the servo-control


actuator eye-end (Ref. TASK 27-34-51-400-006).



EFF :
ALL
 27-34-00



AIJ




Page 640
May 01/11

Elevator Eye-end Correct Installation


Figure 609/TASK 27-34-00-991-015



EFF :
ALL
 27-34-00



AIJ




Page 641
May 01/11

Subtask 27-34-00-420-052
B. Check of the Attachments Torque Values of the Servo-Controls (34CE1,
34CE2, 34CE3, 34CE4)
(1) Make sure that the torque values of the servo-control attachments are
correct (Ref. TASK 27-34-51-400-001).
(a) If the torque values are not correct, do a check of the
servo-control attachments (Ref. TASK 27-34-51-200-001).
(b) Make sure that the torque values of the servo-control attachments
are correct (Ref. TASK 27-34-51-400-001).
(2) Remove the COLLAR DEPTH ACTUATOR (98D27309009002) or COLLAR DEPTH
ACTUATOR (98D27309009003) .
Subtask 27-34-00-480-061
C. Installation of the Tools
(Ref. Fig. 610/TASK 27-34-00-991-016, 611/TASK 27-34-00-991-017, 612/TASK
27-34-00-991-018)

(1) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) on the screwjack of the THS actuator (6).
(2) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) on the
right side:
(a) Remove the screw (12) and the protector (13) from the setting bar
(10).
(b) Remove the other protectors from the setting bar.
(c) Remove the two screws (7) from the access panel.
(d) Install the yoke (8) on the THS.
To keep a good contact between the yoke and the THS, you must not
TORQUE the threaded pins.
(e) Install the two threaded pins (9) on the yoke (8).
(f) Install the setting bar (10) on the yoke (8).



EFF :
ALL
 27-34-00



AIJ




Page 642
May 01/11

Installation of the Pin-rigging


Figure 610/TASK 27-34-00-991-016



EFF :
ALL
 27-34-00



AIJ




Page 643
May 01/11

Installation of the Elevator Neutral Setting Gauge


Figure 611/TASK 27-34-00-991-017



EFF :
ALL
 27-34-00



AIJ




Page 644
May 01/11

Installation of the Yoke


Figure 612/TASK 27-34-00-991-018



EFF :
ALL
 27-34-00



AIJ




Page 645
May 01/11

Subtask 27-34-00-860-078
D. Preparation for the Adjustment
CAUTION : MAKE SURE THAT YOU REMOVE THE COLLAR-ELEVATOR SERVO CONTROL
_______
SAFETY BEFORE YOU PRESSURIZE THE ELEVATOR SERVO CONTROL. IF
YOU DO NOT REMOVE THE COLLAR, YOU CAN CAUSE DAMAGE TO THE
ELEVATOR SERVO CONTROL.
(1) Pressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003).
(2) On the overhead panel 23VU:
- release the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton switches
(the OFF legends come on).
(3) On the overhead panel 24VU:
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (the FAULT and OFF legends are off).
(4) On the upper ECAM display unit:
- make sure that the F/CTL ELAC 2 FAULT or F/CTL ELAC 2 PITCH FAULT
warning is not shown.
(5) On the maintenance panel 50VU, make sure that the HYD/LEAK
MEASUREMENT VALVES/G, B and Y pushbutton switches are pushed (the OFF
legends are off).
Subtask 27-34-00-820-071
E. Check of the Adjustment of the Elevator Servocontrol
(Ref. Fig. 611/TASK 27-34-00-991-017, 612/TASK 27-34-00-991-018, 613/TASK
27-34-00-991-019)

NOTE : At this step, the right inboard servocontrol (Yellow) is in the


____
active mode. The right outboard servocontrol (Blue) is in the
damping mode.
(1) Push with your hands on the front and on the middle of the setting
bar and make sure that the contact of the setting bar (10) between
the yoke (8) and the THS surface is correct.
(2) Make sure that the gap between the upper surface of the elevator and
the end part of the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000)
(10) is in the limits of the feeler gauge (11).



EFF :
ALL
 27-34-00



AIJ




Page 646
May 01/11

Elevator Position Transducer Unit


Figure 613/TASK 27-34-00-991-019



EFF :
ALL
 27-34-00



AIJ




Page 647
May 01/11

(3) Make sure that you can easily engage/disengage the rigging pin
into/from the elevator position transducer-unit (14).
(4) If the servocontrol or the transducer unit is not adjusted, do this
procedure (Ref. TASK 27-34-00-820-003).
(5) On the overhead panel 24VU, release the FLT CTL/ELAC 2 and FLT
CTL/SEC 2 pushbutton switches (the OFF legends come on).
(6) On the overhead panel 23VU, push the FLT CTL/ELAC 1 and FLT CTL/SEC 1
pushbutton switches (the OFF legends go off).
(7) Make sure that the F/CTL ELAC 1 FAULT or F/CTL ELAC 1 PITCH FAULT
warning is not shown on the upper ECAM display unit.
NOTE : At this step, the right inboard servocontrol (Yellow) is in
____
the damping mode. The right outboard servocontrol (Blue) is in
the active mode.
(8) Do steps (1) thru (4) again for the right outboard servocontrol.
(9) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) from the
upper surface of the right elevator.
(10) Install the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) on the
upper surface of the left elevator.
(11) On the overhead panel 24VU, push the FLT CTL/ELAC 2 and FLT CTL/SEC 2
pushbutton switches (the OFF legends go off).
(12) Make sure that the F/CTL ELAC 2 FAULT or F/CTL ELAC 2 PITCH FAULT
warning is not shown on the upper ECAM display unit.
(13) On the overhead panel 23VU, release the FLT CTL/ELAC 1 and FLT
CTL/SEC 1 pushbutton switches (the OFF legends come on).
NOTE : At this step, the left inboard servocontrol (Green) is in the
____
active mode. The left outboard servocontrol (Blue) is in the
damping mode.
(14) Do steps (1) thru (4) again for the left inboard servocontrol.
(15) On the overhead panel 24VU, release the FLT CTL/ELAC 2 and FLT
CTL/SEC 2 pushbutton switches (the OFF legends come on).
(16) On the overhead panel 23VU, push the FLT CTL/ELAC 1 and FLT CTL/SEC 1
pushbutton switches (the OFF legends go off).



EFF :
ALL
 27-34-00


R 
AIJ




Page 648
May 01/11

(17) Make sure that the F/CTL ELAC 1 FAULT or F/CTL ELAC 1 PITCH FAULT
warning is not shown on the upper ECAM display unit.
NOTE : At this step, the left inboard servocontrol (Green) is in the
____
damping mode. The left outboard servocontrol (Blue) is in the
active mode.
(18) Do steps (1) thru (4) again for the left outboard servocontrol.
(19) On the overhead panel 24VU, push the FLT CTL/ELAC 2 and FLT CTL/SEC 2
pushbutton switches (the OFF legends go off).
5. Close-up
________
Subtask 27-34-00-080-055
A. Removal of the Tools
(Ref. Fig. 610/TASK 27-34-00-991-016, 611/TASK 27-34-00-991-017)

(1) Remove the GAUGE-ELEVATOR NEUTRAL SETTING (98D27309006000) from the


upper surface of the left elevator.
(a) Remove the setting bar (10) from the yoke (8).
(b) Remove the two threaded pins (9) and the yoke.
(c) Install the two screws (7) on the access panel.
(d) Install the protector (13) and the screw (12) on the setting bar
(10).
(e) Install the other protectors on the setting bar.
(2) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)
(5) from the screwjack of the THS actuator (6).
(3) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O side sticks.
Subtask 27-34-00-860-077
B. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001) (Ref. TASK
29-10-00-864-003).



EFF :
ALL
 27-34-00



AIJ




Page 649
May 01/11

(2) Remove the warning notice(s).


(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-34-00-410-066
C. Close Access
(1) Close the access door 312AR.
(2) Close the THS trailing-edge access-panels (Ref. TASK 55-13-11-400001):
(a) 334DB for the left elevator.
(b) 344DB for the right elevator.
(3) Install the protective cover on the battery power center 105VU.
(4) Tighten the two screws.
(5) Close the access door 822 (Ref. TASK 52-41-00-410-002).
(6) Remove the access platform(s).



EFF :
ALL
 27-34-00



AIJ




Page 650
May 01/11

ELEVATOR - REMOVAL/INSTALLATION
_______________________________
TASK 27-34-41-000-001
Removal of the Elevator
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific
No specific
98D27309008000
98D27903500000
98D55209004000

1
1
1
1
2
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
CRANE HEIGHT 15 M (50 FT)
WARNING NOTICE(S)
SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION
PIN-SIDE STICK LOCKING
SLING, REM.-INST.- ELEVATOR



EFF :
ALL
 27-34-41



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-51-000-001
27-92-13-000-001

29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-16-48-000-001
CMM 552115
27-34-41-991-004
27-34-41-991-001
27-34-41-991-003

Removal of the Elevator Servo Control


Removal of the Elevator Position Transducer-Unit
49CE1, 49CE2
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Removal of the Elevator Support Struts
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-34-41-991-004)
Subtask 27-34-41-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the elevators and the trimmable horizontal stabilizer
are set to a neutral position.
Subtask 27-34-41-860-050
B. Depressurize Hydraulic Systems
(1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).



EFF :
ALL
 27-34-41



AIJ




Page 402
Aug 01/11

R
R

Hoist Points Plugs


Figure 401/TASK 27-34-41-991-004



EFF :
ALL
 27-34-41



AIJ




Page 403
Feb 01/07

Subtask 27-34-41-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-41-481-050
D. Install Locking Pins.
(1) Put the PIN-SIDE STICK LOCKING in the CAPT and F/O side stick
controllers.
Subtask 27-34-41-941-050
E. Safety Precautions
R

(1) Put the WARNING NOTICE(S) in the flight compartment to tell persons
not to operate the flight controls.

(2) Put the WARNING NOTICE(S) in position to tell persons not to operate
the hydraulic systems.

R
R

(3) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at zone 334
for the left hand elevator and/or zone 344 for the right hand
elevator.
Subtask 27-34-41-010-050
F. Access

R
R

(1) Open the THS lower trailing edge access panels of the horizontal
stabilizer 334BB, 344BB, 334DB, 344DB, 334FB, 344FB, 334GB, 344GB,
334HB, 344HB (Ref. TASK 55-13-11-000-001).



EFF :
ALL
 27-34-41



AIJ




Page 404
Aug 01/11

Subtask 27-34-41-020-052
G. Hoisting Lugs
(1) Remove the hoist point plugs (10).
(2) Install the hoisting lugs.
Subtask 27-34-41-480-050
H. Attach Support Equipment
(1) Put the CRANE HEIGHT 15 M (50 FT) into position.
R
R

(2) Attach the SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION or the SLING,


REM.-INST.- ELEVATOR to the hoisting points and to the crane.
(3) Operate the crane and slowly tighten the sling cables. Adjust the
turnbuckles as necessary to get an equal tension on all cables.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-34-41-991-001, 403/TASK 27-34-41-991-003)
Subtask 27-34-41-020-053
A. Removal of the Elevator
(1) Disconnect the bonding straps (elevator side).

R
R

(a) Remove the nuts (18), the washers (20),the bolts (21) and
disconnect the bonding straps (19).

(2) Disconnect the elevator position transducer (Ref. TASK 27-92-13-000001).

R
R

(3) Disconnect the elevator servo control units (elevator side)


(Ref. TASK 27-34-51-000-001).
NOTE : Make sure that the harness connectors 49CE1, 49CE2 are
____
disconnected before removing the servo control units.
(4) Disconnect the elevator from the elevator hinge fitting No. 4.
(a) Disconnect the elevator support strut (16). (Ref. TASK 55-16-48000-001).



EFF :
ALL
 27-34-41



AIJ




Page 405
Aug 01/11

R
R

Elevator-Removal/Installation.
Figure 402/TASK 27-34-41-991-001



EFF :
ALL
 27-34-41



AIJ




Page 406
Feb 01/07

R
R

Elevator-Removal/Installation
Figure 403/TASK 27-34-41-991-003



EFF :
ALL
 27-34-41



AIJ




Page 407
Feb 01/07

(b) Remove the sleeve (17).


R
R

NOTE : Make sure that the sleeve (17) is removed from the hinge
____
fitting before you remove the elevator. Damage can occur.
(c) Remove and discard the cotter pin (6).
(d) Remove the bolt (5) and the bush (4) from the hinge support.
(5) Disconnect the elevator from the elevator hinge fittings No. 1, 2, 3,
5 and 6.
(a) Remove and discard the cotter pin (9).
(b) Remove the nut (7).
(c) Remove and discard the cotter pins (6).
(d) Remove the bolts (5) and the bushes (4) from all the hinge
supports.
(6) Carefully remove the elevator from the hinge arms and lower it onto a
correct support.
WARNING : THIS PROCEDURE IS IN A CATEGORY KNOWN AS A CRITICAL DESIGN
_______
CONFIGURATION CONTROL LIMITATION (CDCCL). YOU MUST KEEP ALL
CDCCL ITEMS IN THE APPROVED CONFIGURATION. MAKE SURE THAT
THE WEIGHT OF THE ELEVATOR IS IN THE SPECIFIED LIMITS.

R
R

(a) Make sure that the elevator weight is in the (Ref. CMM 552115)
limits before you do maintenance procedures.

R
R

NOTE : Some maintenance procedures (repairs, paint work, etc.)


____
can cause the elevator weight to increase.

R
R
R

NOTE : Elevator weight can have an effect on the


____
interchangeability of the component. If the elevator
weight is out of the limits refer to CMMM 552115 for
instructions.



EFF :
ALL
 27-34-41



AIJ




Page 408
Aug 01/11

5. Close-up
________
Subtask 27-34-41-080-050
A. Removal of Support Equipment
R
R

(1) Remove the SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION or SLING,


REM.-INST.- ELEVATOR from the elevators.



EFF :
ALL
 27-34-41



AIJ




Page 409
Aug 01/11

TASK 27-34-41-400-001
Installation of the Elevator
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______
IF YOU DO:
- RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
- WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No
No
No
No

98D27309004000
98D27309006000
98D27309008000
98D27903500000
98D55209004000

specific
specific
specific
specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 CRANE HEIGHT 15 M (50 FT)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
2 PIN CENTERING. ELEVATOR INSTALLATION
1 GAUGE-ELEVATOR NEUTRAL SETTING
2 SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION
2 PIN-SIDE STICK LOCKING
2 SLING, REM.-INST.- ELEVATOR



EFF :
ALL
 27-34-41



AIJ




Page 410
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 11-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA ASTM D 740
METHYL-ETHYL-KETONE (Ref. 20-31-00)

Material No. 11-008


Material No. 16-003

(USE 11-008A) (Ref. 20-31-00)


F
ASNB70720
COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6
6
6
6
6
6
9
9
9
9
9

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pins
pins
pins
pin
pins
pins
pins
pins
pins
pins
pins

27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07
27-34-07



EFF :
ALL
 27-34-41


R 
AIJ




21 -040
22 -040
24 -040
26A-010
27 -040
28 -040
21 -060
22 -060
24 -060
27 -060
28 -060

Page 411
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
23-61-41-000-001
23-61-41-400-001
27-34-00-710-001
27-34-00-820-003
27-34-51-400-001
27-92-13-400-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
55-16-48-400-001
55-24-11-000-001
55-24-11-400-001
CMM 552115
27-34-41-991-004
27-34-41-991-001
27-34-41-991-003

Table of the Maximum Permitted Resistance Values


Removal of the Static Discharger
Installation of the Static Discharger
Operational Test of the Elevator and Hydraulic
Actuation
Adjustment of the Elevator and Hydraulic Actuation to
0.5 Degrees Nose-Up with the Gauge-Elevator Neutral
Setting (98D27309006000)
Installation of the Elevator Servo Control
Installation of the Elevator Position Transducer-Unit
49CE1, 49CE2
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Installation of the Elevator Support Struts
Removal of the Elevator Tips and Inboard End Caps.
Installation of the Elevator Tips and End Caps.
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-34-41-991-004)
Subtask 27-34-41-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).
(2) Make sure that the PIN-SIDE STICK LOCKING is in the CAPT and F/O side
stick controllers.
R
R

(3) Make sure that the WARNING NOTICE(S) are in the flight compartment to
tell persons not to operate the flight controls.



EFF :
ALL
 27-34-41



AIJ




Page 412
Aug 01/11

R
R

(4) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to operate the hydraulic systems.

R
R
R

(5) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in


position at zone 334 and/or zone 344.
(6) Make sure that the THS lower trailing edge access panels are opened
334BB, 344BB, 334DB, 344DB, 334FB, 344FB, 334GB, 344GB, 334HB, 344HB.
(Ref. TASK 55-13-11-000-001).
(7) Make sure that the trimmable horizontal stabilizer is set to the
neutral position.
Subtask 27-34-41-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-41-210-050
C. Visual Inspection
(1) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-34-41



AIJ




Page 413
Aug 01/11

Subtask 27-34-41-560-050
D. Preparation for Installation
WARNING : THIS PROCEDURE IS IN A CATEGORY KNOWN AS A CRITICAL DESIGN
_______
CONFIGURATION CONTROL LIMITATION (CDCCL). YOU MUST KEEP ALL
CDCCL ITEMS IN THE APPROVED CONFIGURATION. MAKE SURE THAT THE
WEIGHT OF THE ELEVATOR IS IN THE SPECIFIED LIMITS.
R
R

(1) Make sure that the elevator weight is in the (Ref. CMM 552115) limits
before you do maintenance procedures.

R
R

NOTE : Some maintenance procedures (repairs, paint work, etc.) can


____
cause the elevator weight to increase.

R
R

NOTE : Elevator weight can have an effect on the interchangeability


____
of the component. If the elevator weight is out of the limits
refer to CMMM 552115 for instructions.
(2) Prepare the elevator for installation.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(a) If you replace the elevator, remove these items from the removed
elevator and install them to the new elevator.
- elevator tips and end caps (Ref. TASK 55-24-11-000-001)
(Ref. TASK 55-24-11-400-001),
- static dischargers. (Ref. TASK 23-61-41-000-001) (Ref. TASK 2361-41-400-001).

R
R

(b) Clean all connecting hardware with CLEANING AGENTS (Material No.
11-003) and examine for damage and corrosion.
(c) Clean all attach fittings with CLEANING AGENTS (Material No. 11008) and examine for damage and corrosion.
(d) On a new elevator remove the hoist point plugs (10) and install
the hoisting lugs.



EFF :
ALL
 27-34-41



AIJ




Page 414
Aug 01/11

(e) Put the CRANE HEIGHT 15 M (50 FT) into position.


R
R
R

(f) Attach the SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION or the


SLING, REM.-INST.- ELEVATOR to the crane and to the hoisting
lugs.
(g) Operate the crane and slowly tighten the sling cables. Adjust the
turnbuckles as necessary to get an equal tension to all cables.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-34-41-991-001, 403/TASK 27-34-41-991-003)
Subtask 27-34-41-420-051
A. Installation

R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL


_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the support connections, lift the elevator clear of the
support and move it to the installation position.

(2) Install the PIN CENTERING. ELEVATOR INSTALLATION to the hinge


fittings No. 2 and 6.
(3) Connect the elevator to the elevator hinge fittings No. 1, 3 and 5:
(a) Apply COMMON GREASE (Material No. 04-004) to the bushes (4) and
install them.
(b) Apply COMMON GREASE (Material No. 04-004) to the bolts (5) and
install them.
(c) Safety the bolts (5) with cotter pins (6).
(d) Install the nuts (7).
(e) TORQUE the nuts (7) to between 0.79 and 0.96 m.daN (69.91 and
84.95 lbf.in).



EFF :
ALL
 27-34-41



AIJ




Page 415
Aug 01/11

(f) Safety the nuts (7) with a new cotter pins (9).
(4) Connect the elevator to the elevator hinge fitting No. 4.
(a) Apply COMMON GREASE (Material No. 04-004) to the sleeve (17) and
the bush (4) and install them.
(b) Install the bolt (5) and safety with a new cotter pin (6).
(c) Put in position and install the elevator support strut (16)
(Ref. TASK 55-16-48-400-001).
R

(5) Remove the PIN CENTERING. ELEVATOR INSTALLATION from the hinge
fittings No. 2 and 6.
(6) Connect the elevator to the hinge fittings No. 2 and 6:
(a) Apply COMMON GREASE (Material No. 04-004) to the bushes (4) and
install them.
(b) Apply COMMON GREASE (Material No. 04-004) to the bolts (5) and
install them.
(c) Safety the bolts (5) with cotter pins (6).
(d) Install the nuts (7).
(e) TORQUE the nuts (7) to between 0.79 and 0.96 m.daN (69.91 and
84.95 lbf.in).
(f) Safety the nuts (7) with a new cotter pins (9).
(7) Connect the elevator servo controls (Ref. TASK 27-34-51-400-001).
(8) Connect the elevator position transducer (Ref. TASK 27-92-13-400-001)
(9) Connect the bonding straps (19) with the bolts (21), the washers (20)
and the nuts (18).
(10) Do a check of the maximum bonding value (Ref. TASK 20-28-00-869-002)
- Make sure that the maximum bonding value is no more than 50
milliohms.
- Between the hinge arm fitting of the THS and the Inboard Elevator
fitting.

R
R
R
R
R



EFF :
ALL
 27-34-41



AIJ




Page 416
Aug 01/11

(11) Apply STRUCTURE PAINTS (Material No. 16-003) to the bonding


connection.
Subtask 27-34-41-720-050
B. Test
R

(1) Install the GAUGE-ELEVATOR NEUTRAL SETTING and verify the elevator
neutral position, (Ref. TASK 27-34-00-820-003).
(2) Do an operational test of the elevators (Ref. TASK 27-34-00-710-001).
5. Close-up
________
(Ref. Fig. 401/TASK 27-34-41-991-004)
Subtask 27-34-41-080-051
A. Remove Support Equipment
(1) Remove the hoisting equipment.

R
R

(a) Remove the SLING-LIFTING, ELEVATOR REMOVAL/INSTALLATION or SLING,


REM.-INST.- ELEVATOR from the elevator.
(b) Remove the hoisting lugs.
(c) Install the hoist point plugs (10).
NOTE : When installed the plugs must fit flush to the skin of the
____
Horizontal Stabilizer.
Subtask 27-34-41-210-051
B. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-41-410-050
C. Close access
(1) Close the THS lower trailing edge access panels 334BB, 344BB, 334DB,
344DB, 334FB, 344FB, 334GB, 344GB, 334HB, 344HB. (Ref. TASK 55-13-11400-001).



EFF :
ALL
 27-34-41



AIJ




Page 417
Aug 01/11

Subtask 27-34-41-942-050
D. Remove Ground Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).
Subtask 27-34-41-081-050
E. Remove Locking Pins
(1) Remove the PIN-SIDE STICK LOCKING from the CAPT and F/O side stick
controllers.
Subtask 27-34-41-865-051
R

F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-34-41



AIJ




Page 418
Aug 01/11

ELEVATOR - INSPECTION/CHECK
___________________________
TASK 27-34-41-200-001
In Service Wear Limits of the Elevator Hinge Fittings
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-34-41-000-001
27-34-41-400-001
CMM 552115
27-34-41-991-005

Removal of the Elevator


Installation of the Elevator
Fig. 601

3. __________
Job Set-up
Subtask 27-34-41-010-051
A. Get Access
(1) Remove the aplicable elevator (Ref. TASK 27-34-41-000-001).
4. Procedure
_________
(Ref. Fig. 601/TASK 27-34-41-991-005)
Subtask 27-34-41-220-050
A. Fits and Clearances
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-34-41



AIJ




Page 601
Aug 01/08

In Service Wear Limits - Elevator Hinge Fittings


Figure 601/TASK 27-34-41-991-005



EFF :
ALL
 27-34-41



AIJ




Page 602
Nov 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 7.912 | 7.924 |
|
| 7.899 |
|
|
| OD 3
|(0.3114) |(0.3119) |
|
|(0.3109) |
|
|
|
|
|
| 0.001 | 0.025 |
|
| 0.051 |
|
|
|
| (0.0000*| (0.0009*|
|
|(0.0020*|
| B
| 7.925 | 7.937 |
|
|
| 7.950 |
|
| ID 1
|(0.3120) |(0.3124) |
|
|
|(0.3129) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********
R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.

NOTE : Wear is only permitted for bush (1).


____
Subtask 27-34-41-220-051
B. Fits and Clearances

(1) Complete an inspection of these dimensions.


------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 10.989 | 11.000 |
|
| 10.974 |
|
|
| OD 1
|(0.4326) |(0.4330) |
|
|(0.4320) |
|
|
|
|
|
| 0.000 | 0.029 |
|
| 0.059 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0023)|
| B
| 11.000 | 11.018 |
|
|
| 11.033 |
|
| ID 2
|(0.4330) |(0.4337) |
|
|
|(0.4343) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.



EFF :
ALL
 27-34-41



AIJ




Page 603
Nov 01/07

Subtask 27-34-41-220-052
C. Fits and Clearances
R

R
R
R
R
R
R
R

(1) Complete an inspection of these dimensions.


------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.989 | 16.000 |
|
| 0.000 |
|
|
| OD 7
|(0.6294) |(0.6299) |
|
|(0.0000) |
|
|
|
|
|
| 0.000 | 0.029 |
|
| 0.000 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0000)|
| C
| 16.000 | 16.018 |
|
|
| 0.000 |
|
| ID 5
|(0.6299) |(0.6306) |
|
|
|(0.0000) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.

R
R

NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates


____
that the item can not be worn.
Subtask 27-34-41-220-053
D. Fits and Clearances

(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-34-41



AIJ




Page 604
Nov 01/07

R
R
R
R
R
R
R

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.675 | 12.687 |
|
| 0.000 |
|
|
| OD 8
|(0.4990) |(0.4994) |
|
|(0.0000) |
|
|
|
|
|
| 0.000 | 0.025 |
|
| 0.000 |
|
|
|
| (0.0000)| (0.0009)|
|
|(0.0000)|
| C
| 12.687 | 12.700 |
|
|
| 0.000 |
|
| ID 7
|(0.4994) |(0.5000) |
|
|
|(0.0000) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.

R
R

NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates


____
that the item can not be worn.
Subtask 27-34-41-220-055
E. Fits and Clearances

R
R
R
R
R
R
R

(1) Complete an inspection of these dimensions.


------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.675 | 12.687 |
|
| 0.000 |
|
|
| OD 8
|(0.4990) |(0.4994) |
|
|(0.0000) |
|
|
|
|
|
| 0.000 | 0.025 |
|
| 0.000 |
|
|
|
| (0.0000)| (0.0009)|
|
|(0.0000)|
| C
| 12.687 | 12.700 |
|
|
| 0.000 |
|
| ID 4
|(0.4994) |(0.5000) |
|
|
|(0.0000) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.



EFF :
ALL
 27-34-41



AIJ




Page 605
Nov 01/07

NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates


____
that the item can not be worn.
Subtask 27-34-41-220-054
F. Fits and Clearances
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.500 | 9.512 |
|
| 0.000 |
|
|
| OD 6
|(0.3740) |(0.3744) |
|
|(0.0000) |
|
|
|
|
|
| 0.000 | 0.025 |
|
| 0.000 |
|
|
|
| (0.0000)| (0.0009)|
|
|(0.0000)|
| C
| 9.512 | 9.525 |
|
|
| 0.000 |
|
| ID 8
|(0.3744) |(0.3750) |
|
|
|(0.0000) |
|
------------------------------------------------------------------------------NOTE : If the values are more than the limits, the item can be
____
replaced.
NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates
____
that the item can not be worn.
Subtask 27-34-41-020-055
G. Replacement of Unserviceable Items
(1) For removal of the plain bushes a dimensional check is not necessary.
(2) If the plain-bushes internal diameter are out of limits see the CMM
replacement procedure (Ref. CMM 552115).

(3) If you find unserviceable bolts or plain bushes replace them with new
parts.



EFF :
ALL
 27-34-41



AIJ




Page 606
Aug 01/08

5. Close-up
________
Subtask 27-34-41-410-051
A. Close Access
R

(1) Install the elevator (Ref. TASK 27-34-41-400-001).


Subtask 27-34-41-942-051
B. Removal of Equipment
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-34-41



AIJ




Page 607
Nov 01/07

FILTER - HYDRAULIC - SERVICING


______________________________
TASK 27-34-42-600-001
Servicing of the Elevator Servo Control Actuator Filter
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R

No specific
No specific
No specific
98D27903500000

warning notices
access platform 3.5 m (11 ft. 6 in.)
1 CONTAINER 5 L(1 1/2 USGAL)
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-42



AIJ




Page 301
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
R

lockwire-corrosion resistant steel 0.6mm dia


F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
27-34-42-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 301

3. __________
Job Set-up
Subtask 27-34-42-860-050
A. Depressurize Hydraulic Systems
(1) Depressurize the Green, Yellow and Blue hydraulic systems.(Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00864-003)



EFF :
ALL
 27-34-42



AIJ




Page 302
Nov 01/08

Subtask 27-34-42-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-34-42-481-050
C. Install Locking Devices
(1) Put the PIN-SIDE STICK LOCKING (98D27903500000) in the CAPT and F/O
side stick controllers.
Subtask 27-34-42-941-050
D. Safety Precautions.
(1) Put the warning notices in position to tell persons not to operate
the flight controls.
(2) Put the warning notices in position to tell persons not to pressurize
the hydraulic systems.
(3) Put the access platform in position at zone 334 for the left hand
trailing edge access panels and 344 for the right hand trailing edge
access panels.
Subtask 27-34-42-010-050
E. Access
(1) Open the trailing edge access panels 334DB, 344DB (Ref. TASK 55-1311-000-001).



EFF :
ALL
 27-34-42


R 
AIJ




Page 303
Feb 01/07

4. Procedure
_________
(Ref. Fig. 301/TASK 27-34-42-991-001)
WARNING : DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN YOUR
_______
MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH YOUR SKIN
AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM YOUR EYES, MOUTH OR
SKIN WITH WATER. GET MEDICAL AID IF YOU GET HYDRAULIC FLUID IN
YOUR EYES OR MOUTH.
Subtask 27-34-42-010-051
A. Removal of the Filter
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
NOTE : The removal of the filter(1) from the elevator servo-control
____
actuator 34CE1 is given. The removal of the filter (1) from the
elevator servo-control actuators 34CE2, 34CE3 and 34CE4 is the
same.
(1) Remove and discard the lockwire from the connection of the filter (1)
and the supply block (3).
R

(2) Put the CONTAINER 5 L(1 1/2 USGAL) below the filter (1) to collect
the unwanted hydraulic fluid.
NOTE : Make sure that the hydraulic fluid is removed if it drops onto
____
components or structure
(3) Remove the filter (1) from the supply block (3).
(4) Remove and discard the packing (2) from the filter (1).
(5) Remove and discard the unwanted hydraulic fluid.
Subtask 27-34-42-640-050
B. Preparation for Installation
(1) Lubricate the packing (2) with HYDRAULIC FLUIDS (Material No. 02003).
NOTE : Make sure that HYDRAULIC FLUIDS (Material No. 02-003) is
____
removed if it drops onto components or structure.



EFF :
ALL
 27-34-42



AIJ




Page 304
Nov 01/10

R
R

Elevator Servo-control Actuator Filter


Figure 301/TASK 27-34-42-991-001



EFF :
ALL
 27-34-42



AIJ




Page 305
Feb 01/07

Subtask 27-34-42-420-050
C. Install the Filter
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Install the filter (1) into the supply block (3).
(2) Safety the filter (1) with lockwire-corrosion resistant steel 0.6mm
dia to the supply block (3).
(3) Remove all signs of hydraulic fluid from the filter area.
NOTE : Make sure that the hydraulic fluid is removed if it drops onto
____
components or structure.
Subtask 27-34-42-081-050
D. Remove Locking Devices
(1) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O side stick controllers.
Subtask 27-34-42-865-051
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
19CE1, 19CE2, 19CE3
Subtask 27-34-42-860-051
F. Pressurize Hydraulic Systems
(1) Pressurize the Green, Yellow and Blue hydraulic systems. (Ref. TASK
29-10-00-863-001) (Ref. TASK 29-10-00-863-002) (Ref. TASK 29-10-00863-003)



EFF :
ALL
 27-34-42


R 
AIJ




Page 306
Feb 01/07

Subtask 27-34-42-870-050
G. Bleeding
(1) Bleed the elevator servo-control actuators.
(a) Operate the side stick to move the elevator surfaces.
(b) Do this ten times and then put the side stick back to the neutral
position.
Subtask 27-34-42-210-050
H. Visual Inspection
(1) Make sure that there are no leaks at the joint between the filter (1)
and the supply block (3).
5. Close-up
________
Subtask 27-34-42-410-051
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-42-410-050
B. Close Access
(1) Close the trailing-edge access panels 334DB, 344DB (Ref. TASK 55-1311-400-001).
Subtask 27-34-42-611-050
C. Replenish Hydraulic System
WARNING : DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN
_______
YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM YOUR
EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU GET
HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
(1) If necessary,replenish the hydraulic system (Ref. TASK 12-12-29-611001).



EFF :
ALL
 27-34-42


R 
AIJ




Page 307
Feb 01/07

Subtask 27-34-42-942-051
D. Remove Ground Equipment
(1) Remove the access platform(s).
(2) Remove the warning notice(s).



EFF :
ALL
 27-34-42


R 
AIJ




Page 308
Feb 01/07

SERVO CONTROL - ELEVATOR (34CE1,34CE2,34CE3,34CE4) - REMOVAL/INSTALLATION


_________________________________________________________________________
R

TASK 27-34-51-000-001
Removal of the Elevator Servo Control
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______
IF YOU DO:
- RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
- WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The removal of the servo control unit 34CE1 is given. The removal of the
____
servo control units 34CE2, 34CE3 and 34CE4 is the same.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-34-51



AIJ




Page 401
Feb 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

blanking caps
circuit breaker(s) safety clip(s)

No specific
No specific
No specific
98D27309003000
98D27309009003
98D27903500000

warning notices
access platform 3.5 m (11 ft. 6 in.)
CONTAINER 5 L(1 1/2 USGAL)
DEVICE - LOCKING, ELEVATOR
COLLAR DEPTH ACTUATOR
PIN-SIDE STICK LOCKING

R
R
R

1
1
1
2

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------20
25

cotter pin
cotter pin

27-34-07 11 -030
27-34-07 11 -020A

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
27-34-51-991-001
27-34-51-991-010
27-34-51-991-013

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Fig. 401
Fig. 402
Fig. 403



EFF :
ALL
 27-34-51



AIJ




Page 402
Nov 01/10

3. __________
Job Set-up
Subtask 27-34-51-860-052
A. Make Sure that the Hydraulic Systems Are Depressurized
(1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00864-003).
Subtask 27-34-51-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-860-062
C. Aircraft Maintenance Configuration
(1) On the center pedestal, make sure that the pitch-trim control wheels
are set to 0.
Subtask 27-34-51-941-050
D. Safety Precautions
(1) Put the warning notices on the pitch control wheels to tell persons
not to move the THS.
(2) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.



EFF :
ALL
 27-34-51


R 
AIJ




Page 403
Feb 01/07

(3) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
(4) Put the access platform in position at zone 334 for the left hand
elevator and/or zone 344 for the right hand elevator.
Subtask 27-34-51-010-050
E. Access
(1) Open the trailing edge access panels 334DB(LH)) and/or 344DB(RH).
(Ref. TASK 55-13-11-000-001).
Subtask 27-34-51-481-050
F. Install Safety Device
(1) Install the PIN-SIDE STICK LOCKING in the CAPT and the F/O side
sticks.
(2) Move the elevator by hand at the upper position and install the
COLLAR DEPTH ACTUATOR (98D27309009003) on the servocontrol that will
not be removed to facilitate the access to the work area.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-34-51-991-001)
Subtask 27-34-51-020-059
A. Disconnection of Electrical connectors and Hydraulic Pipes
(1) Disconnect the electrical connectors.

--------------------------------------------------------------------------| Servo Control Unit


|
Electrical Connectors
|
ITEM
|
ZONE
|
--------------------------------------------------------------------------|
34CE1
|
34CE1-A
|
3
|
335
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE1-B
|
1
|
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE1-C
|
2
|
|
|-----------------------|---------------------------|----------|----------|
|
34CE2
|
34CE2-A
|
3
|
345
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE2-B
|
1
|
|
|-----------------------|---------------------------|----------|----------|



EFF :
ALL
 27-34-51



AIJ




Page 404
Nov 01/10

R
R

Elevator Servo-Control Unit


Figure 401/TASK 27-34-51-991-001



EFF :
ALL
 27-34-51



AIJ




Page 405
Feb 01/07

--------------------------------------------------------------------------| Servo Control Unit


|
Electrical Connectors
|
ITEM
|
ZONE
|
--------------------------------------------------------------------------|
|
34CE2-C
|
2
|
|
|-----------------------|---------------------------|----------|----------|
|
34CE3
|
34CE3-A
|
3
|
335
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE3-B
|
1
|
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE3-C
|
2
|
|
|-----------------------|---------------------------|----------|----------|
| 34CE4
|
34CE4-A
|
3
|
345
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE4-B
|
1
|
|
|-----------------------|---------------------------|----------|----------|
|
|
34CE4-C
|
2
|
|
--------------------------------------------------------------------------(a) Disconnect the electrical connectors (1), (2) and (3).
(b) Put blanking caps on the disconnected electrical connector(s).
(2) Disconnect the hydraulic connections.
WARNING : DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN
_______
YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM
YOUR EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU
GET HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
CAUTION : YOU MUST ALWAYS PUT CAPS ON DISCONNECTED HOSES AND
_______
FITTINGS. IF YOU DO NOT DO THIS, YOU MAY CAUSE:
- CONTAMINATION OF THE HOSES,
- DAMAGE TO THE SYSTEM COMPONENTS,
- HYDRAULIC FLUID LEAKS.
IF HYDRAULIC FLUID LEAKS OCCUR OR IF YOU LET HYDRAULIC
FLUID FALL, YOU MUST CLEAN IT UP IMMEDIATELY. HYDRAULIC
FLUID CAN CAUSE DAMAGE.
R

(a) Put a CONTAINER 5 L(1 1/2 USGAL) below the servo controls.
(b) Disconnect the flexible hoses (5) and (6) from the servo control
unit (4).
(c) Drain the unwanted hydraulic fluid into the container.
(d) Remove and discard the unwanted hydraulic fluid.



EFF :
ALL
 27-34-51



AIJ




Page 406
Nov 01/10

(e) Put blanking caps on the flexible hoses (5) and (6) and the
unions of the servo control unit (4).
(f) Remove the bonding lead (7), the nut (8), the washer (9) and the
bolt (11).
Subtask 27-34-51-020-063
B. Removal of the Servocontrol Unit from the Elevator Attachment
(Ref. Fig. 401/TASK 27-34-51-991-001, 402/TASK 27-34-51-991-010)
(1) Disconnect the servocontrol unit (4) from the elevator.
(a) Remove the cotter pin (20) and cotter pin (25), and discard them.
(b) Remove the locking cup (21), the nut (22) and the washer (24).
(c) Remove the bolt (27) and bush (26).
Subtask 27-34-51-020-064
C. Removal of the Servo Control Unit from the THS Attachment
(Ref. Fig. 401/TASK 27-34-51-991-001, 403/TASK 27-34-51-991-013)
(1) Disconnect the servo control unit (4) from the horizontal stabilizer
structure
(a) Remove and discard the cotter pin (38).
(b) Remove the locking cup (31) the nut (30) and the washer (41).
(c) Remove the nuts (33), the washers (32) the bolts (35), the
washers (36) and the profile (37).
(2) Support the servo control unit (4).
(3) Remove the bolt (28), the washer (29).
(4) Remove the servo control unit (4) from the aircraft.
R
R

NOTE : When both servo control units are removed, install the DEVICE____
LOCKING, ELEVATOR (98D27309003000).
(5) Remove the bush (26) and (27).



EFF :
ALL
 27-34-51



AIJ




Page 407
Nov 01/10

R
R

Elevator Servocontrol Unit _ Elevator Attachment


Figure 402/TASK 27-34-51-991-010



EFF :
ALL
 27-34-51



AIJ




Page 408
Feb 01/07

R
R

Elevator Servo Control Unit - THS Attachment


Figure 403/TASK 27-34-51-991-013



EFF :
ALL
 27-34-51



AIJ




Page 409
Aug 01/09

TASK 27-34-51-400-001
Installation of the Elevator Servo Control
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______
IF YOU DO:
- RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
- WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The installation of the servo control unit 34CE1 is shown. The
____
installation of the servo control units 34CE2, 34CE3 and 34CE4 are the
same. For the correct location of the servo control units compare the
identification placards.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-34-51



AIJ




Page 410
Feb 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
98D27309003000
98D27309009003
98D27903500000

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
1 DEVICE - LOCKING, ELEVATOR
1 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-002
Material No. 05-005

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------20
25
38

cotter pin
cotter pin
cotter pin

27-34-07 11 -030
27-34-07 11 -020A
27-34-07 12C-020



EFF :
ALL
 27-34-51



AIJ




Page 411
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-34-00-820-001
27-34-00-820-002
27-34-00-820-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
27-34-51-991-001
27-34-51-991-010
27-34-51-991-013

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Adjustment of the Elevator and Hydraulic Actuation
(with the reference triangle on the tail cone)
Adjustment of the Elevator and Hydraulic Actuation
after Removal/Installation of one Servocontrol
Adjustment of the Elevator and Hydraulic Actuation to
0.5 Degrees Nose-Up with the Gauge-Elevator Neutral
Setting (98D27309006000)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-34-51-860-063
A. Aircraft Maintenance Configuration
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).
(2) Make sure that the PIN-SIDE STICK LOCKING (98D27903500000) is in the
CAPT and F/O side stick controllers.
R
R

(3) Make sure that the COLLAR DEPTH ACTUATOR (98D27309009003) is


installed on the remainder servocontrol.
(4) Make sure that the warning notices are on the pitch control wheels to
tell persons not to move the THS.
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.



EFF :
ALL
 27-34-51



AIJ




Page 412
Nov 01/09

(6) Make sure that the warning notices are in position to tell persons
not to operate the hydraulic systems.
(7) Make sure that the access platforms are in position at zone 334
and/or zone 344.
(8) Make sure that access panels 334DB and/or 344DB are open (Ref. TASK
55-13-11-000-001).
R

(9) Make sure that the DEVICE - LOCKING, ELEVATOR (98D27309003000) is


installed on the elevator when both servo control units are removed.
Subtask 27-34-51-865-076
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-140-050
C. Cleaning
(1) Clean the component interface and/or the adjacent area.
Subtask 27-34-51-210-051
D. Visual Inspection
(1) Do an inspection of the component interface and/or the adjacent area.
(2) Make sure that the hydraulic line end-fittings are serviceable.



EFF :
ALL
 27-34-51



AIJ




Page 413
Nov 01/10

4. Procedure
_________
(Ref. Fig. 401/TASK 27-34-51-991-001)
Subtask 27-34-51-420-064
A. Installation of the Servo Control Unit to the THS attachment.
(Ref. Fig. 401/TASK 27-34-51-991-001, 403/TASK 27-34-51-991-013)

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL


_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Apply COMMON GREASE (Material No. 04-004) to the outer surface of the
bush (26) and (27) and install them.
(2) Apply SPECIAL MATERIALS (Material No. 05-002) to the head and shank
of the bolt (28).
(3) Put the servo control unit (4) in position and support it.
(4) Install the bolt (28) with the washer (29).
(5) Apply COMMON GREASE (Material No. 04-004) to the thread of the bolt
(28).
(6) Install the washer (41).
(7) Install and torque the nut (30) to between 4.5 and 5.0 m.daN (33.18
and 36.87 lbf.ft)
(8) Install the locking cup (31) and the cotter pin (38)
(9) Install the plate (37) with the washers (32), (36) the nuts (33) and
the bolts (35).
(10) Apply SPECIAL MATERIALS (Material No. 05-005) to all the remaining
unprotected steel attachment parts of the elevator servo control.
NOTE : Do not allow SPECIAL MATERIALS (Material No. 05-005) to get on
____
the servo control spherical bearing .



EFF :
ALL
 27-34-51



AIJ




Page 414
Nov 01/10

Subtask 27-34-51-420-065
B. Installation of the Servocontrol Unit to the Elevator attachment.
(Ref. Fig. 401/TASK 27-34-51-991-001, 402/TASK 27-34-51-991-010)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Apply COMMON GREASE (Material No. 04-004) to the outer surface of the
bush (26) and install it.
(2) Apply SPECIAL MATERIALS (Material No. 05-002) to the head and shank
of the bolt (27).
(3) Put the servocontrol unit (4) in position and support it.
(4) Install the bolt (27).
(5) Apply COMMON GREASE (Material No. 04-004) to the thread of the bolt
(27).
R

(6) Install the washer (24) and the nut (22).

NOTE : The counterbored surface of the washer must be on the Hinge.


____
(7) Torque the nut (22) to between 4.5 and 5.0 m.daN (33.18 and 36.87
lbf.ft).
(8) Install the locking cup (21), and the cotter pin (20) and cotter pin
(25).
(9) Apply SPECIAL MATERIALS (Material No. 05-005) to all the remaining
unprotected steel attachment parts of the elevator servocontrol.
NOTE : Do not allow SPECIAL MATERIALS (Material No. 05-005) to get on
____
the servocontrol spherical bearing .



EFF :
ALL
 27-34-51



AIJ




Page 415
Feb 01/09

Subtask 27-34-51-420-063
C. Hydraulic and Electrical Connection of the Servo Control Unit to the
Horizontal Stabilizer.
(1) Connect the hydraulic connections.
WARNING : DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN
_______
YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH
YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM
YOUR EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU
GET HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
(a) Remove the blanking caps from the flexible hoses (5) and (6) and
the unions of the servo control unit (4).
(b) Connect the flexible hoses (5) and (6) to the servo control unit
(4).
NOTE : Do not twist the flexible hoses (5) and (6) when you
____
tighten the union nuts. Make sure that the flexible hoses
(5) and (6) do not rub on adjacent components.
(c) Install the bonding lead (7) with the bolt (11), the washer (9)
and the nut (8) (Ref. TASK 20-28-00-912-004)
(2) Connect the electrical connections.
(a) Remove the blanking caps.
(b) Connect the electrical connectors.
---------------------------------------------------------------------| Servo Control Unit | Electrical Connector
| ITEM
|
ZONE
|
---------------------------------------------------------------------|
34CE1
|
34CE1-A
|
3
|
335 |
|
|
34CE1-B
|
1
|
|
|
|
34CE1-C
|
2
|
|
|---------------------|-------------------------|---------|----------|
|
34CE2
|
34CE2-A
|
3
|
345 |
|
|
34CE2-B
|
1
|
|
|
|
34CE2-C
|
2
|
|
|---------------------|-------------------------|---------|----------|
|
34CE3
|
34CE3-A
|
3
|
335 |
|
|
34CE3-B
|
1
|
|
|
|
34CE3-C
|
2
|
|
|---------------------|-------------------------|---------|----------|



EFF :
ALL
 27-34-51



AIJ




Page 416
Nov 01/10

---------------------------------------------------------------------| Servo Control Unit | Electrical Connector


| ITEM
|
ZONE
|
---------------------------------------------------------------------|
34CE4
|
34CE4-A
|
3
|
345
|
|
|
34CE4-B
|
1
|
|
|
|
34CE4-C
|
2
|
|
---------------------------------------------------------------------Subtask 27-34-51-710-050
D. Adjustment Test
CAUTION : MAKE SURE THAT YOU REMOVE THE COLLAR-ELEVATOR SERVO CONTROL
_______
SAFETY BEFORE YOU PRESSURIZE THE ELEVATOR SERVO CONTROL. IF
YOU DO NOT REMOVE THE COLLAR, YOU CAN CAUSE DAMAGE TO THE
ELEVATOR SERVO CONTROL.
(1) Remove the COLLAR DEPTH ACTUATOR (98D27309009003) from the adjacent
servo control.
R
R
R

(2) Do an adjustment test of the elevators (Ref. TASK 27-34-00-820-003)


or (Ref. TASK 27-34-00-820-002) or (Ref. TASK 27-34-00-820-001) after
the Removal/Installation of one servo control unit.

R
R
R
R
R

NOTE : If the two servocontrols on the same elevator must be


____
adjusted, do the adjustment of the elevator and hydraulic
actuation with the gauge elevator neutral setting (Ref. TASK
27-34-00-820-003).
5. Close-up
________
Subtask 27-34-51-210-052
A. Visual Inspection.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-51-410-051
B. Close Access.
(1) Close the trailing edge access panels 334DB and 344DB (Ref. TASK 5513-11-400-001).



EFF :
ALL
 27-34-51



AIJ




Page 417
Nov 01/10

Subtask 27-34-51-942-050
C. Remove Ground Equipment.
(1) Remove the warning notice(s).
(2) Remove the access platform(s).
Subtask 27-34-51-865-051
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2, 19CE1, 19CE2, 19CE3, 20CE1, 20CE2, 21CE1,
21CE2, 21CE3, 22CE
Subtask 27-34-51-081-050
E. Remove Safety Device
(1) Remove the safety device previously installed.



EFF :
ALL
 27-34-51


R 
AIJ




Page 418
Aug 01/08

TASK 27-34-51-000-008
Removal of the Elevator Servo Control Actuator Servo Valve
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The removal of the elevator servo-control actuator 34CE1 servo-valve is
____
given. The removal of the servo-control actuator 34CE2, 34CE3 and 34CE4
servo-valves are the same.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-34-51



AIJ




Page 419
Feb 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27309001000
98D27309009003
98D27903500000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
access platform 3.5 m (11 ft. 6 in.)
1 NEUTRAL SETTING TOOL - ELEVATOR
1 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
27-34-51-991-012
27-34-51-991-003

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-34-51-860-068
A. Aircraft Maintenance Configuration
(1) Make sure that the elevator and the horizontal stabilizer controls
are set to the neutral position.
Subtask 27-34-51-860-056
B. Depressurize Hydraulic Systems.
(1) Depressurize the Green, Yellow and Blue hydraulic systems. (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00864-003)



EFF :
ALL
 27-34-51



AIJ




Page 420
Feb 01/11

Subtask 27-34-51-865-062
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-481-053
D. Install Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Put the PIN-SIDE STICK LOCKING (98D27903500000) in the CAPT and F/O
side stick controllers.
R
R

(2) Install the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000) or


COLLAR DEPTH ACTUATOR (98D27309009003) on the elevator:
(a) Remove the cover from the THS hoisting point RIB11.
(b) Release the wing nut (6).
(c) Push the plate assembly (5) on the THS trailing edge. Make sure
that the center plate (7) and the forward plate (8) rest on the
THS surface.
(d) Remove the T-handle screw (1) and the washer (2) from the stowage
on the center plate (7).
(e) Install the T-handle screw (1) and the washer (2) through the
center plate (7) and the THS hoisting point.



EFF :
ALL
 27-34-51



AIJ




Page 421
Feb 01/11

R
R

Servo Control Elevator - Installation of the Tool-Elevator Neutral Setting


Figure 404/TASK 27-34-51-991-012



EFF :
ALL
 27-34-51



AIJ




Page 422
Aug 01/07

(f) Make sure that:


- The forward plate (8) is on the line of the rivets that attach
the THS leading edge to the THS front spar.
- The bars (3) follow the line of the RIB11.
- The THS trailing edge is correctly positioned between the two
parts of the plate assembly (5).
(g) Tighten the T-handle screw (1) and the wing nut (6).
Subtask 27-34-51-941-057
E. Safety Precautions.
(1) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(2) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
(3) Put the access platform in position at zones 334 for the left-hand
trailing edge access panels and 344 for the right-hand trailing edge
access panels.
Subtask 27-34-51-010-057
F. Access
(1) Open the trailing-edge access panels 334DB and/or 344DB. (Ref. TASK
55-13-11-000-001)
4. Procedure
_________
(Ref. Fig. 405/TASK 27-34-51-991-003)
Subtask 27-34-51-020-062
A. Disconnect Electrical Connectors.
(1) Disconnect the electrical connectors (1).
R

(2) Put blanking caps on the disconnected electrical connector(s).



EFF :
ALL
 27-34-51



AIJ




Page 423
May 01/10

Elevator Servo-Control Actuator Servo-Valve


Figure 405/TASK 27-34-51-991-003



EFF :
ALL
 27-34-51



AIJ




Page 424
Aug 01/07

Subtask 27-34-51-020-057
B. Remove Servo-Valve.
NOTE : Make sure that the servocontrol is at neutral position to prevent
____
any damage to the servovalve feedback ball-probe.
(1) Cut and discard lockwire between bolts (4) and servo-vaalve (6).
(2) Support the servo-valve (6) and remove the bolts (4) and the washers
(5) holding the servo-valve (6) to the servo-control actuator.
(3) Remove the servo-valve (6) from the servo-control actuator.
(4) Remove and discard the O-rings (2) and (3).



EFF :
ALL
 27-34-51


R 
AIJ




Page 425
Aug 01/07

TASK 27-34-51-400-003
Installation of the Elevator Servo Control Actuator Servo Valve
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The installation of the servo control actuator 34CE1 servo valve is
____
given. The installation of the servo control actuator 34CE2, 34CE3 and
34CE4 servo valves are the same.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
R

98D27309001000
98D27309009003
98D27903500000

Torque Wrench : range 0.00 to 1.20 m.daN


(0.00 to 9.00 lbf.ft)
1 NEUTRAL SETTING TOOL - ELEVATOR
1 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-51



AIJ




Page 426
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2
3

O ring
Oring

27-34-51 01A-220
27-34-51 01A-210

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-710-001

R
R

29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
27-34-51-991-012
27-34-51-991-003

Operational Test of the Elevator and Hydraulic


Actuation
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-34-51-860-069
A. Aircraft Maintenance Configuration
(1) Make sure that the elevator and the horizontal stabilizer controls
are set to the neutral position.
(2) Make sure that the PIN-SIDE STICK LOCKING (98D27903500000) is in the
CAPT and F/O side stick controllers.



EFF :
ALL
 27-34-51



AIJ




Page 427
Aug 01/07

R
R
R

(3) Make sure that the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000)
or COLLAR DEPTH ACTUATOR (98D27309009003) is installed on the
elevator.
(4) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.
(6) Make sure that the warning notices are in position to tell persons
not to operate the hydraulic systems.
(7) Make sure that the access platforms are in position at zone 334
and/or zone 344.
(8) Make sure that access panels 334DB and/or 344DB are open (Ref. TASK
55-13-11-000-001).
Subtask 27-34-51-865-077
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-34-51



AIJ




Page 428
Feb 01/11

Subtask 27-34-51-140-052
C. Cleaning
(1) Clean the component interface and/or the adjacent area.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
4. Procedure
_________
R

(Ref. Fig. 405/TASK 27-34-51-991-003)


Subtask 27-34-51-420-053
A. Installation of the Servo Control Actuator Servo Valve
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
NOTE : Make sure that the servocontrol is at neutral position to prevent
____
any damage to the servovalve feedback ball-probe.
(1) Apply COMMON GREASE (Material No. 04-004) to the bolts (4).
(2) Put the O ring (2) and Oring (3)in position on the servo valve (6).
(3) Put the servo valve (6) in position on the servo control actuator and
support it.
(4) Install the washers (5) and the bolts (4) into the servo valve (6).
(5) TORQUE the bolts (4) to between 0.21 and 0.26 m.daN (18.58 and 23.00
lbf.in).
(6) Safety the bolts (4) with lockwire, corrosion resistant steel 0,6mm
(0.027in).
(7) Connect Electrical Connectors.
(a) Remove the blanking caps.
(b) Connect the electrical connectors (1).



EFF :
ALL
 27-34-51



AIJ




Page 429
Aug 01/07

Subtask 27-34-51-081-051
B. Remove Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from the CAPT and
F/O side stick controllers.
R
R

(2) Remove the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000) or COLLAR


DEPTH ACTUATOR (98D27309009003) from the elevator:
(a) Release the wing nut (6).
(b) Remove the T-handle screw (1) and the washer (2).
(c) Remove the set of bars (3) and plates (7) and (8).
(d) Install the T-handle screw (1) and the washer (2) in the stowage
on the center plate (7).
(e) Tighten the wing nut (6).
Subtask 27-34-51-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2, 19CE1, 19CE2, 19CE3, 20CE1, 20CE2, 21CE1,
21CE2, 22CE
Subtask 27-34-51-710-051
D. Operational Test
(1) Do an operational test of the servo controls. (Ref. TASK 27-34-00710-001)
Subtask 27-34-51-210-056
E. Visual Inspection
(1) Inspect the servo valve for leaks.



EFF :
ALL
 27-34-51



AIJ




Page 430
Feb 01/11

5. Close-up
________
Subtask 27-34-51-410-052
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-51-410-053
B. Close Access
(1) Close the trailing edge access panels 334DB and/or 344DB. (Ref. TASK
55-13-11-400-001)
Subtask 27-34-51-942-053
C. Removal Ground Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-51


R 
AIJ




Page 431
Aug 01/07

TASK 27-34-51-000-005
Removal of the Elevator Servo Control Actuator Solenoid Valve
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The removal of the servo control actuator 34CE1 solenoid valve is given.
____
The removal of the servo control actuators 34CE2, 34CE3 and 34CE4
solenoid valves are the same.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-34-51


R 
AIJ




Page 432
Aug 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27309001000
98D27309009003
98D27903500000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
access platform 3.5 m (11 ft. 6 in.)
1 NEUTRAL SETTING TOOL - ELEVATOR
2 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels

27-34-51-991-012
27-34-51-991-004

Fig. 404
Fig. 406

3. __________
Job Set-up
Subtask 27-34-51-860-064
A. Aircraft Maintenance Configuration
(1) Make sure that the elevator and the horizontal stabilizer controls
are set to the neutral position.
Subtask 27-34-51-860-054
B. Depressurize Hydraulic Systems
(1) Make sure that Green, Yellow and Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002) (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-34-51



AIJ




Page 433
Nov 01/10

Subtask 27-34-51-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-481-051
D. Install Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Put the PIN-SIDE STICK LOCKING (98D27903500000) in the CAPT and F/O
side stick controllers.
R
R
R

(2) Move the elevator by hand at the upper position and install the
COLLAR DEPTH ACTUATOR (98D27309009003) on the servocontrol or install
the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000) on the elevator:
(a) Remove the cover from the THS hoisting point at RIB11.
(b) Release the wing nut (6).
(c) Push the plate assembly (5) on the THS trailing edge. Make sure
that the center plate (7) and the forward plate (8) rest on the
THS surface.
(d) Remove the T-handle screw (1) and the washer (2) from the stowage
on the center plate (7).
(e) Install the T-handle screw (1) and the washer (2) through the
center plate (7) and the THS hoisting point.



EFF :
ALL
 27-34-51



AIJ




Page 434
Nov 01/09

(f) Make sure that:


- The forward plate (8) is on the line of the rivets that attach
the THS leading edge to the THS front spar.
- The bars (3) follow the line of the RIB11.
- The THS trailing edge is correctly positioned between the two
parts of the plate assembly (5).
(g) Tighten the T-handle screw (1) and the wing nut (6).
Subtask 27-34-51-941-054
E. Safety Precautions
(1) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(2) Put the warning notices in position to tell persons not pressurize
the hydraulic systems.
(3) Put the access platform in position at zone 334 for the left hand
trailing edge access panels and/or 344 for the right hand trailing
edge access panels.
Subtask 27-34-51-010-054
F. Access
(1) Open the trailing edge access panels 334DB and/or 344DB. (Ref. TASK
55-13-11-000-001)
4. Procedure
_________
(Ref. Fig. 406/TASK 27-34-51-991-004)
Subtask 27-34-51-020-060
A. Disconnect Electrical Connectors.
(1) Disconnect the electrical connectors (1).
R

(2) Put blanking caps on the disconnected electrical connector(s).



EFF :
ALL
 27-34-51



AIJ




Page 435
May 01/10

Electrovalves Removal/Installation
Figure 406/TASK 27-34-51-991-004



EFF :
ALL
 27-34-51



AIJ




Page 436
Aug 01/07

Subtask 27-34-51-020-054
B. Remove the Solenoid Valves
(Ref. Fig. 406/TASK 27-34-51-991-004)
NOTE : There are two solenoid valves on each servo control unit. They are
____
shown as Solenoid Valve No.1 and Solenoid Valve No.2.
(1) Cut and discard lockwire between bolts (4) and solenoide valve (3).
(2) Support the solenoid valve (3) and remove the bolts (4) holding the
solenoid valve (3) to the servo control actuator.
(3) Remove the solenoid valve (3) from the servo control actuator.
(4) Remove and discard the O-ring (2).
R
R

(5) Install the protective plate to the solenoid valve mounting face
(Ref. AIPC 27-34-51-01-230).



EFF :
ALL
 27-34-51



AIJ




Page 437
Nov 01/10

TASK 27-34-51-400-004
Installation of the Elevator Servo Control Actuator Solenoid Valve
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The installation of the servo control actuator 34CE1 solenoid valve is
____
given. The installation of the servo control actuator 34CE2, 34CE3 and
34CE4 solenoid valves are the same.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
R

98D27309001000
98D27309009003
98D27903500000

Torque Wrench : range 0.00 to 1.20 m.daN


(0.00 to 9.00 lbf.ft)
1 NEUTRAL SETTING TOOL - ELEVATOR
2 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-51



AIJ




Page 438
Nov 01/09

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2

O ring

27-34-51 01A-210

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-710-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001

Operational Test of the Elevator and Hydraulic


Actuation
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels

27-34-51-991-012
27-34-51-991-004

Fig. 404
Fig. 406

3. __________
Job Set-up
Subtask 27-34-51-860-065
A. Aircraft Maintenance Configuration
(1) Make sure that the elevator and the horizontal stabilizer controls
are set to the neutral position.
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).
(3) Make sure that the PIN-SIDE STICK LOCKING (98D27903500000) is in the
CAPT and F/O side stick controllers.
(4) Make sure that the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000)
is installed on the elevators or make sure that the COLLAR DEPTH
ACTUATOR (98D27309009003) is installed on the servo controls.
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.



EFF :
ALL
 27-34-51



AIJ




Page 439
Nov 01/10

(6) Make sure that the warning notices are in position to tell persons
not to operate the hydraulic systems.
(7) Make sure that the access platforms are in position at zone 334
and/or zone 344.
(8) Make sure that the access panels 334DB and/or 344DB are open
(Ref. TASK 55-13-11-000-001).
Subtask 27-34-51-865-078
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-140-053
C. Cleaning
(1) Clean the component interface and/or the adjacent area.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.



EFF :
ALL
 27-34-51


R 
AIJ




Page 440
Aug 01/07

4. Procedure
_________
(Ref. Fig. 406/TASK 27-34-51-991-004)
Subtask 27-34-51-420-055
A. Install the servo control actuator solenoid valves
(Ref. Fig. 406/TASK 27-34-51-991-004)
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
NOTE : There are two solenoid valves on each servo control unit, they are
____
shown as Solenoid Valve No. 1 and Solenoid Valve No. 2.
R
R

(1) Remove the protective plate to the solenoid valve mounting face (Ref.
AIPC 27-34-51-01-230).
(2) Put the O ring (2) in position on the solenoid valve (3).
(3) Put the solenoid valve (3) in position on the servo-control actuator
and support it.
(4) Install the bolts (4) into the solenoid valve (3).
(5) TORQUE the bolts (4) to between 0.33 and 0.41 m.daN (29.20 and 36.28
lbf.in)
(6) Safety the bolts (4) with lockwire, corrosion resistant steel 0,6mm
(0.027in) dia.
(7) Connect the electrical connectors.
(a) Remove the blanking caps.
(b) Connect the electrical connectors (1).
Subtask 27-34-51-081-052
B. Remove Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Remove the PIN-SIDE STICK LOCKING from the CAPT and the F/O side
stick controllers.
CAUTION : MAKE SURE THAT YOU REMOVE THE COLLAR-ELEVATOR SERVO
_______
CONTROL SAFETY BEFORE YOU PRESSURIZE THE ELEVATOR SERVO
CONTROL. IF YOU DO NOT REMOVE THE COLLAR, YOU CAN CAUSE
DAMAGE TO THE ELEVATOR SERVO CONTROL.



EFF :
ALL
 27-34-51



AIJ




Page 441
Nov 01/10

R
R
R

(2) Remove the COLLAR DEPTH ACTUATOR (98D27309009003) from the servo
control or remove the NEUTRAL SETTING TOOL - ELEVATOR from the
elevator:
(a) Release the wing nut (6).
(b) Remove the T-handle screw (1) and the washer (2).
(c) Remove the set of bars (3) and plates (7) and (8).
(d) Install the T-handle screw (1) and the washer (2) in the stowage
on the center plate (7).
(e) Tighten the wing nut (6).
Subtask 27-34-51-865-057
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2, 19CE1, 19CE2, 19CE3, 20CE1, 20CE2, 21CE1,
21CE2, 22CE
Subtask 27-34-51-710-052
D. Operational Test
(1) Do an operational test of the servo controls. (Ref. TASK 27-34-00710-001)
5. Close-up
________
Subtask 27-34-51-410-054
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-51-420-056
B. Close Access
(1) Close the trailing edge access panels 334DB and/or 344DB. (Ref. TASK
55-13-11-400-001)



EFF :
ALL
 27-34-51



AIJ




Page 442
Nov 01/09

Subtask 27-34-51-942-054
C. Remove Ground Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-51


R 
AIJ




Page 443
Aug 01/07

TASK 27-34-51-000-006
Removal of the Elevator Servo Control Actuator Mode Selector Valve Transducer
MSVT
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The removal of the elevator servo control actuator 34CE1 mode selector
____
valve transducer is given. The removal of the servo control actuator
34CE2, 34CE3 and 34CE4 mode selector valve transducers are the same.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-34-51


R 
AIJ




Page 444
Aug 01/07

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27309001000
98D27903500000

blanking caps
circuit breaker(s) safety clip(s)
warning notices
access platform 3.5 m (11 ft. 6 in.)
1 NEUTRAL SETTING TOOL - ELEVATOR
2 PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
27-34-51-991-012
27-34-51-991-005

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Fig. 404
Fig. 407

3. __________
Job Set-up
Subtask 27-34-51-860-066
A. Aircraft Maintenance Configuration
(1) Make sure that the elevators and the horizontal stabilizer controls
are set to the neutral position.
Subtask 27-34-51-860-055
B. Depressurize Hydraulic Systems
(1) Depressurize the Green, Yellow and Blue hydraulic systems. (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00864-003)



EFF :
ALL
 27-34-51



AIJ




Page 445
Feb 01/09

Subtask 27-34-51-865-058
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-481-052
D. Install Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Put the PIN-SIDE STICK LOCKING (98D27903500000) in the CAPT and F/O
side stick controllers.
R

(2) Install the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000) on the


elevator:
(a) Remove the cover from the THS hoisting point at RIB11.
(b) Release the wing nut (6).
(c) Push the plate assembly (5) on the THS trailing edge. Make sure
that the center plate (7) and the forward plate (8) rest on the
THS surface.
(d) Remove the T-handle screw (1) and the washer (2) from the stowage
on the center plate (7).
(e) Remove the T-handle screw (1) and the washer (2) through the
center plate (7) and the THS hoisting point.



EFF :
ALL
 27-34-51



AIJ




Page 446
Feb 01/09

(f) Make sure that:


- The forward plate (8) is on the line of the rivets that attach
the THS leading edge to the THS front spar.
- The bars (3) follow the line of the RIB11.
- The THS trailing edge is correctly positioned between the two
parts of the plate assembly (5).
(g) Tighten the T-handle screw (1) and the wing nut (6).
Subtask 27-34-51-941-055
E. Safety Precautions
(1) Put the warning notices in the flight compartment to tell persons not
to operate the flight controls.
(2) Put the warning notices in position to tell persons not to operate
the hydraulic systems.
(3) Put the access platform in position at zones 334 for the left hand
trailing edge access panels and/or zone 344 for the right hand
trailing edge access panels.
Subtask 27-34-51-010-055
F. Access
(1) Open the trailing edge access panels 334DB and/or 344DB (Ref. TASK
55-13-11-000-001).
4. Procedure
_________
(Ref. Fig. 407/TASK 27-34-51-991-005)
Subtask 27-34-51-020-061
A. Disconnect Electrical Connectors
(1) Disconnect the electrical connectors.
R

(2) Put blanking caps on the disconnected electrical connector(s).



EFF :
ALL
 27-34-51



AIJ




Page 447
May 01/10

Elevator Servo-Control Actuator Mode Selector Valve Transducer


Figure 407/TASK 27-34-51-991-005



EFF :
ALL
 27-34-51



AIJ




Page 448
Aug 01/07

Subtask 27-34-51-020-055
B. Remove Mode Selector Valve Transducer (MSVT)
(1) Support the MSVT (3) and remove the bolts (4) and the washers (5)
holding the MSVT (3) to the servo control actuator.
(2) Remove the MSVT (3) from the servo control actuator.
(3) Remove the O rings (6) and (7).



EFF :
ALL
 27-34-51


R 
AIJ




Page 449
Aug 01/07

TASK 27-34-51-400-005
Installation of the Elevator Servo Control Actuator Mode Selector Valve
Transducer MSVT
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
NOTE : The installation of the servo control actuator 34CE1 mode selector valve
____
transducer is given. The installation of the servo control actuator
34CE2, 34CE3 and 34CE4 mode selector transducer valves are the same.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
R

98D27309001000
98D27903500000

Torque Wrench : range 0.00 to 1.20 m.daN


(0.00 to 9.00 lbf.ft)
1 NEUTRAL SETTING TOOL - ELEVATOR
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-51



AIJ




Page 450
Feb 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-710-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
27-34-51-991-012
27-34-51-991-005

Operational Test of the Elevator and Hydraulic


Actuation
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 404
Fig. 407

3. __________
Job Set-up
Subtask 27-34-51-860-067
A. Aircraft Maintenance Configuration
(1) Make sure that the elevators and the horizontal stabilizer are set to
the neutral position.
(2) Make sure that the PIN-SIDE STICK LOCKING (98D27903500000) is in the
CAPT and F/O side stick controllers.
R

(3) Make sure that the NEUTRAL SETTING TOOL - ELEVATOR (98D27309001000)
is installed on the elevator.
(4) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).
(5) Make sure that the warning notices are in the flight compartment to
tell persons not to operate the flight controls.



EFF :
ALL
 27-34-51



AIJ




Page 451
Feb 01/09

(6) Make sure that the warning notices are in position to tell persons
not to operate the hydraulic systems.
(7) Make sure that the access platforms are in position at zone 334
and/or zone 344.
(8) Make sure that access panels 334DB and/or 344DB are open (Ref. TASK
55-13-11-000-001).
Subtask 27-34-51-865-079
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-140-054
C. Cleaning
(1) Clean the component interface and/or the adjacent area.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.



EFF :
ALL
 27-34-51


R 
AIJ




Page 452
Aug 01/07

4. Procedure
_________
(Ref. Fig. 407/TASK 27-34-51-991-005)
Subtask 27-34-51-420-057
A. Install the servo control actuator MSVT
(1) Apply COMMON GREASE (Material No. 04-004) to the bolts (4).
(2) Install the O rings (6) and (7) in the MSVT (3).
(3) Put the MSVT (3) in position on the servo control actuator and
support it.
(4) Install the washers (5) and the bolts (4) into the MSVT (3).
(5) TORQUE the bolts (4) to between 0.33 and 0.41 m.daN (29.20 and 36.28
lbf.in)
(6) Remove the blanking caps.
(7) Connect the electrical connectors.
Subtask 27-34-51-081-053
B. Remove Locking Devices
(Ref. Fig. 404/TASK 27-34-51-991-012)
(1) Remove the PIN-SIDE STICK LOCKING from the CAPT and F/O side stick
controllers.
R

(2) Remove the NEUTRAL SETTING TOOL - ELEVATOR from the elevator:
(a) Release the wing nut (6).
(b) Remove the T-handle screw (1) and the washer (2).
(c) Remove the set of bars (3) and plates (7) and (8).
(d) Install the T-handle screw (1) and the washer (2) in the stowage
on the center plate(7).
(e) Tighten the wing nut (6).



EFF :
ALL
 27-34-51



AIJ




Page 453
Feb 01/09

Subtask 27-34-51-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 15CE2, 16CE1, 16CE2, 19CE1, 19CE2, 19CE3, 20CE1, 20CE2, 21CE1,
21CE2, 22CE
Subtask 27-34-51-710-053
D. Operational Test
(1) Do an operational test of the servo controls. (Ref. TASK 27-34-00710-001)
5. Close-up
________
Subtask 27-34-51-410-055
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-34-51-410-056
B. Close Access
(1) Close the trailing edge access panels 334DB and/or 344DB (Ref. TASK
55-13-11-400-001)
Subtask 27-34-51-942-055
C. Remove Ground Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-51


R 
AIJ




Page 454
Aug 01/07

TASK 27-34-51-000-009
Removal of the Servo Control Actuator Eye-End
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
1. __________________
Reason for the Job
Self explanatory.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R

No specific
No specific
98D27309009003
98D27903500000

1
1
1
2

ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


WARNING NOTICE(S)
COLLAR DEPTH ACTUATOR
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-51



AIJ




Page 455
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-51-000-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
27-34-51-991-006

Removal of the Elevator Servo Control


Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Fig. 408

3. __________
Job Set-up
Subtask 27-34-51-860-070
A. Aircraft Maintenance Configuration
(1) Make sure that the elevator and the horizontal stabilizer controls
are set to the neutral position.
Subtask 27-34-51-860-057
B. Depressurize Hydraulic Systems
(1) Make sure that the Green, Yellow and the Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002) (Ref. TASK 29-10-00-864-003).

R
R

Subtask 27-34-51-865-072
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17



EFF :
ALL
 27-34-51



AIJ




Page 456
Aug 01/11

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-481-054
D. Install Locking Devices
R

(1) Install the PIN-SIDE STICK LOCKING in the CAPT and F/O side stick
controllers.

(2) Move the elevator by hand at the upper position and install the
COLLAR DEPTH ACTUATOR on the servo control that will not be removed.
Subtask 27-34-51-941-060
E. Safety Precautions

(1) Put the WARNING NOTICE(S) in the flight compartment to tell persons
not to operate the flight controls.

(2) Put the WARNING NOTICE(S) in position to tell persons not to operate
the hydraulic systems.
(3) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at zone 334
for the left hand trailing edge access panels and/or zone 344 for the
right hand trailing edge access panels.
Subtask 27-34-51-010-058
F. Access

(1) Open the trailing edge access panels 334DB and/or 344DB (Ref. TASK
55-13-11-000-001).



EFF :
ALL
 27-34-51



AIJ




Page 457
Aug 01/11

4. Procedure
_________
(Ref. Fig. 408/TASK 27-34-51-991-006)
Subtask 27-34-51-020-058
A. Disconnect the servo-control actuator eye-end from the elevator
attachment.
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Remove the servo control actuator (10) from the elevator attachment.
(Ref. TASK 27-34-51-000-001)
NOTE : The complete removal of the servo control actuator is not
____
necessary. You must remove only the servo-control actuator
attachment from the elevator.
(2) Support the servo control unit (10).
(3) Move the servo control unit eye-end (6) clear of the elevator.
(4) Remove the servo-control actuator eye-end.
R

(a) Remove and discard the lockwire.


(b) Release the lock nut (7).
(c) Release the lock washer (8) from the key washer (9).
(d) Remove the eye-end (6) from the servo control actuator (10).
NOTE : Record the number of turns required to remove the eye-end
____
from the servo control actuator.



EFF :
ALL
 27-34-51



AIJ




Page 458
Aug 01/11

Servo-Control Actuator Eye-End


Figure 408/TASK 27-34-51-991-006



EFF :
ALL
 27-34-51



AIJ




Page 459
Aug 01/09

TASK 27-34-51-400-006
Installation of the Servo Control Actuator Eye-End
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______
CARBONFIBER REINFORCED PLASTIC.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
98D27309009003
98D27903500000

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 COLLAR DEPTH ACTUATOR
2 PIN-SIDE STICK LOCKING



EFF :
ALL
 27-34-51



AIJ




Page 460
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-00-820-002
27-34-51-000-009
27-34-51-400-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
55-13-11-000-001
55-13-11-400-001
CMM 273452
27-34-51-991-006

Adjustment of the Elevator and Hydraulic Actuation


after Removal/Installation of one Servocontrol
Removal of the Servo Control Actuator Eye-End
Installation of the Elevator Servo Control
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Remove/Open of the THS Trailing Edge Access Panels
Install/Close of the THS Trailing Edge Access Panels
Fig. 408

3. __________
Job Set-up
Subtask 27-34-51-860-071
A. Aircraft Maintenance Configuration
(1) Make sure that the elevators and the horizontal stabilizer controls
are set to the neutral position.
R

(2) Make sure that the PIN-SIDE STICK LOCKING is in the CAPT and F/O side
stick controllers.

(3) Make sure that the COLLAR DEPTH ACTUATOR is installed on the
elevator.
(4) Make sure that the hydraulic systems are depressurized (Ref. TASK 2910-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00864-003).



EFF :
ALL
 27-34-51



AIJ




Page 461
Aug 01/11

R
R

(5) Make sure that the WARNING NOTICE(S) are in the flight compartment to
tell persons not to operate the flight controls.

R
R

(6) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to operate the hydraulic systems.

R
R
R

(7) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE are in
position at zone 334 and/or zone 344.

(8) Make sure that access panels 334DB and/or 344DB are open (Ref. TASK
55-13-11-000-001).
Subtask 27-34-51-865-080
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-140-056
C. Cleaning
(1) Clean the component interface and/or the adjacent area.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.



EFF :
ALL
 27-34-51



AIJ




Page 462
Aug 01/11

4. Procedure
_________
Subtask 27-34-51-420-061
R

A. Installation of the Servo Control Actuator Eye-End

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.

(Ref. Fig. 408/TASK 27-34-51-991-006)

R
R

(1) Make sure that servo control actuator eye-end (6) is new or an
inspection was done since its last removal from the aircraft.

R
R

NOTE : For more instructions refer to SB A320-27A1186 or to Goodrich


____
SB 31075-27-21.

R
R

(2) Apply SPECIAL MATERIALS (Material No. 05-002) to the two threads of
the eye-end (6).

(3) Install the nut (7) to the limit of the inner thread of the eye-end
(6).

R
R

(4) Install the lock washer (8) and the key washer (9) to the inner
thread of the eye-end (6).

(5) Install the eye-end (6) to the servo control actuator (10) to the
same number of turns recorded on the removal task.

R
R

NOTE : The pre-adjustment range between the centers of the servo


____
control actuator two eye-ends must be from 410 mm (16.1417
in.) to 416 mm (16.3779 in.) with the elevator set to neutral
position.
NOTE : When replacing one servo control, the other one is used as a
____
reference. In case both servo control have to be replaced,
they have to be removed in sequence, one after the other and
not both at the same time.

(6) Engage key washer (9) in servo-control fitting and make sure that the
key washer (9) is fully engaged on the servo-control fitting.



EFF :
ALL
 27-34-51



AIJ




Page 463
Aug 01/11

R
R
R

(7) Engage lock washer (8) in key washer (9) and make sure that the face
serrations of the lock washer (8) and the key washer (9) are fully
engaged.

(8) Torque the lock nut (7) to between 3.0 and 3.5 m.daN (22.12 and 25.81
lbf.ft).
NOTE : Do not safety the lock nut (7) and the key washer (9) with
____
lockwire. This is requested when correct adjustment of the
elevator is confirmed (Ref. TASK 27-34-00-820-002).

(9) If is not possible to do correctly the engage of the parts (7), (8),
(9) and (10), it is recommended to do the following:
(a) Remove the eye-end (6) (Ref. TASK 27-34-51-000-009).
(b) Do an inspection of the threads of the eye-end (6) for
indications of wear, marks and scratches.

R
R

(c) Do an inspection of the lock washer (8) and the key washer (9)
for indications of wear on the face serrations.
(d) If any item is not correct, the complete unit must be repaired
(Ref. CMM 273452).
(e) If all items are correct, install the eye-end (6) to the servo
control actuator (10).
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.
_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.

(10) Install the servo control actuator (10) (Ref. TASK 27-34-51-400-001).
Subtask 27-34-51-081-054
B. Remove Locking Devices

(1) Remove the PIN-SIDE STICK LOCKING from the CAPT and the F/O side
stick controllers.

(2) Remove the COLLAR DEPTH ACTUATOR from the elevator.



EFF :
ALL
 27-34-51



AIJ




Page 464
Aug 01/11

Subtask 27-34-51-865-075
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-34-51-820-050
D. Adjustment Test
CAUTION : MAKE SURE THAT YOU REMOVE THE COLLAR-ELEVATOR SERVO CONTROL
_______
SAFETY BEFORE YOU PRESSURIZE THE ELEVATOR SERVO CONTROL. IF
YOU DO NOT REMOVE THE COLLAR, YOU CAN CAUSE DAMAGE TO THE
ELEVATOR SERVO CONTROL.

R
R

(1) Do an adjustment test of the elevators (Ref. TASK 27-34-00-820-002)


after the removal/installation of the servo control actuator eye-end.
5. Close-up
________
Subtask 27-34-51-410-057
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-34-51



AIJ




Page 465
Aug 01/11

Subtask 27-34-51-410-058
B. Close Access
R

(1) Close the trailing edge access panels 334DB and/or 344DB (Ref. TASK
55-13-11-400-001).
Subtask 27-34-51-942-057
C. Remove Ground Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-34-51



AIJ




Page 466
Aug 01/11

SERVO CONTROL - ELEVATOR (34CE1,34CE2,34CE3,34CE4) - INSPECTION/CHECK


_____________________________________________________________________
TASK 27-34-51-200-001
R

In Service Wear Limits of the Elevator Servo-Control Attach-Fittings


1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-34-51-000-001
27-34-51-400-001
27-34-51-991-007

Removal of the Elevator Servo Control


Installation of the Elevator Servo Control
Fig. 601

3. __________
Job Set-up
Subtask 27-34-51-010-059
A. Get Access
(1) Remove the elevator servo control (Ref. TASK 27-34-51-000-001).
4. Procedure
_________
(Ref. Fig. 601/TASK 27-34-51-991-007)
Subtask 27-34-51-220-050
A. Fits and Clearances
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-34-51



AIJ




Page 601
Nov 01/07

In Service Wear Limits - Elevator Servo-Control Attach-Fittings


Figure 601/TASK 27-34-51-991-007



EFF :
ALL
 27-34-51



AIJ




Page 602
May 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 19.987 | 20.000 |
|
| 19.970 |
|
|
| OD 1
|(0.7868) |(0.7874) |
|
|(0.7862) |
|
|
|
|
|
| 0.000 | 0.034 |
|
| 0.068 |
|
|
|
| (0.0000)| (0.0013)|
|
|(0.0026)|
| A
| 20.000 | 20.021 |
|
|
| 20.038 |
|
| ID 2
|(0.7874) |(0.7882) |
|
|
|(0.7888) |
|
------------------------------------------------------------------------------NOTE : If the values are more than the limits, the items must be
____
replaced.
NOTE : Wear is only permitted for bush (1).
____

Subtask 27-34-51-220-051-A

B. Fits and Clearances

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

(1) Complete an inspection of these dimensions for STA-LOK nuts.


------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.846 | 15.862 |
|
| 15.831 |
|
|
| OD 3
|(0.6238) |(0.6244) |
|
|(0.6232) |
|
|
|
|
|
| 0.000 | 0.029 |
|
| 0.059 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0023)|
| A
| 15.862 | 15.875 |
|
|
| 15.890 |
|
| ID 1
|(0.6244) |(0.6250) |
|
|
|(0.6255) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.

NOTE : Wear is only permitted for the bush (1).


____



EFF :
ALL
 27-34-51



AIJ




Page 603
May 01/11

Subtask 27-34-51-220-060

C. Fits and Clearances

(1) Complete an inspection of these dimensions for CASTELLATED nuts.

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.846 | 15.862 |
|
| 15.816 |
|
|
| OD 3
|(0.6238) |(0.6244) |
|
|(0.6226) |
|
|
|
|
|
| 0.013 | 0.047 |
|
| 0.107 |
|
|
|
| (0.0005)| (0.0018)|
|
|(0.0042)|
| A
| 15.875 | 15.893 |
|
|
| 15.923 |
|
| ID 1
|(0.6250) |(0.6257) |
|
|
|(0.6268) |
|
-------------------------------------------------------------------------------

R
R

NOTE : If the values are more than the limits, the items must be
____
replaced.

NOTE : Wear is only permitted for the bush (1).


____
Subtask 27-34-51-220-052

D. Fits and Clearances


(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-34-51



AIJ




Page 604
May 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.846 | 15.862 |
|
| 0.000 |
|
|
| OD 3
|(0.6238) |(0.6244) |
|
|(0.0000) |
|
|
|
|
|
| 0.013 | 0.047 |
|
| 0.000 |
|
|
|
| (0.0005)| (0.0018)|
|
|(0.0000)|
| A
| 15.875 | 15.893 |
|
|
| 0.000 |
|
| ID 4
|(0.6250) |(0.6257) |
|
|
|(0.0000) |
|
------------------------------------------------------------------------------NOTE : If the values are more than the limits, the items can be
____
replaced.
NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates
____
that the item can not be worn.
Subtask 27-34-51-220-054

E. Fits and Clearances


(1) Complete an inspection of these dimensions.

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.850 | 15.861 |
|
| 0.000 |
|
|
| OD 5
|(0.6240) |(0.6244) |
|
|(0.0000) |
|
|
|
|
|
| 0.014 | 0.043 |
|
| 0.000 |
|
|
|
| (0.0005)| (0.0016)|
|
|(0.0000)|
| B
| 15.875 | 15.893 |
|
|
| 0.000 |
|
| ID 6
|(0.6250) |(0.6257) |
|
|
|(0.0000) |
|
------------------------------------------------------------------------------NOTE : If the values are more than the limits, the items can be
____
replaced.



EFF :
ALL
 27-34-51



AIJ




Page 605
May 01/11

NOTE : The value 0 in the column IN-SERVICE WEAR LIMITS indicates


____
that the item can not be worn.
Subtask 27-34-51-220-055
R

F. Fits and Clearances


(1) Complete an inspection of these dimensions.

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.480 | 19.493 |
|
| 19.456 |
|
|
| OD 6
|(0.7669) |(0.7674) |
|
|(0.7659) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.089 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0035)|
| B
| 19.500 | 19.521 |
|
|
| 19.545 |
|
| ID 7
|(0.7677) |(0.7685) |
|
|
|(0.7694) |
|
------------------------------------------------------------------------------NOTE : If the values are more than the limits, the items can be
____
replaced.
NOTE : Wear is only permitted for bush (7).
____
NOTE : If bush (7) can be turned by hand force, obey SB A320 55-1023
____
for the specified bush only.
5. Close-up
________
Subtask 27-34-51-410-059
A. Close Access
(1) Install the elevator servo control (Ref. TASK 27-34-51-400-001).
Subtask 27-34-51-942-058
B. Removal of Equipment
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-34-51



AIJ




Page 606
May 01/11

TRIMMABLE HORIZONTAL STABILIZER (THS) - DESCRIPTION AND OPERATION


_________________________________________________________________
1. _______
General
(Ref. Fig. 001)
A trimmable horizontal stabilizer (THS) hinged on the rear part of the
fuselage ensures the pitch trim control.
The two elevators are hinged on the THS.
An actuator with a fail-safe ball screwjack (Ref. 27-44) drives the THS, its
structural attachments are also fail-safe.
Three electric motors ensure the normal control of the actuator. They are
under the control of the two ELACs and the two SECs.
The actuator achieves the autotrim function of the manual or auto-flight
modes and automatically places the THS at the center of the green band at
touchdown.
The standby control is mechanical. The pilots can override the electrical
control via the mechanical control system, through the application of a
sufficient force to the control wheels.
An override mechanism in the THS actuator is used for that purpose.
The override mechanism reverts to the electrical control after release of
the mechanical control.



EFF :
ALL
 27-40-00



AIJ




Page 1
Feb 01/07

INTENTIONALLY BLANK




 27-40-00



AIJ




Page 2
Feb 01/07

Trimmable Horizontal Stabilizer


Figure 001

EFF :
ALL
 27-40-00




AIJ




Page 3/4
Feb 01/07

TRIMMABLE HORIZONTAL STABILIZER (THS) - DEACTIVATION/REACTIVATION


_________________________________________________________________
TASK 27-40-00-040-001
Check of the synchronization between pitch trim handwheel and stabilizer
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-40-01
Flight Controls
ECAM Pitch Trim Position Indication
(FAA Only)
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE



EFF :
ALL
 27-40-00



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-40-00-860-050
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) On the FLT CTL panel 23VU:
- make sure that the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton
switches are pushed (On these pushbutton switches, the OFF and
FAULT legends are off).
(3) On the FLT CTL panel 24VU:
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (On these pushbutton switches, the OFF and
FAULT legends are off).
(4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(5) On the center pedestal, on the ECAM control panel, push the F/CTL
pushbutton switch. (On the lower ECAM display unit, the F/CTL page
comes into view).



EFF :
ALL
 27-40-00


R 
AIJ




Page 402
Feb 01/07

(6) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2923-00-863-001) (Ref. TASK 29-24-00-863-001).
Subtask 27-40-00-941-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone
310 in front of the THS position marks.
Subtask 27-40-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
4. Procedure
_________
Subtask 27-40-00-710-050
A. Check of the synchronization between pitch trim handwheel and stabilizer.

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal, slowly
- The 4 Deg DN indication on each
move one of the pitch-trim control
graduated wheel is opposite the
wheels to the 4 deg. DN stop.
triangle on the center pedestal
index.
- In the zone 310, the position mark of
the THS is opposite the 4th upper
mark on the tail cone.
2. Slowly move one of the pitch-trim
control wheels to the 13.5 deg UP
stop.

- The 13.5 UP mark on each graduated


wheel is opposite the triangle of the
center pedestal index.
- In the zone 310, the position mark of
the THS is opposite the 13.5 th lower
mark on the tail cone.

3. Move the pitch-trim control wheel


to the 0 position.

- In the zone 310, the position mark of


the THS is in front of the neutral
mark on the tail cone.



EFF :
ALL
 27-40-00



AIJ




Page 403
Feb 01/11

5. Close-up
________
Subtask 27-40-00-942-050
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) and (Ref. TASK 29-24-00-864-001).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the access platform(s).
(5) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-40-00


R 
AIJ




Page 404
Feb 01/07

THS MECHANICAL CONTROL - DESCRIPTION AND OPERATION


__________________________________________________
1. _______
General
An actuator operates the trimmable horizontal stabilizer.
The mechanical control includes two rotating control wheels installed on the
center pedestal.
They drive a chain and cable loop up to the mechanical input of the
actuator.
2. Component
__________________
Location
(Ref. Fig. 001, 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------25LM
INDICATOR-L PITCH TRIM, CENTER
211
27-41-41
PEDESTAL
26LM
INDICATOR-R PITCH TRIM, CENTER
212
27-41-41
PEDESTAL
CONTROL MECHANISM-PITCH TRIM
210
27-41-41
REGULATOR-CABLE TENSION
311
312AR
27-41-42
STOP AND GEARSET UNIT-PITCH
121
811
27-41-43
TRIM CONTROL
CABLES-THS CONTROL
27-41-44
3. _____________________
Component Description
A. Cable Tension Compensator
(Ref. Fig. 003)
One cable tension compensator maintains a constant tension on the cables.
B. Stop and Rigging Facilities
A non-adjustable rotation stop installed in the center pedestal limits
the travel of the control wheel.
Another mechanical rotation stop is installed in the THS actuator, at the
input shaft.
The end-of-stroke stops of the actuator ball screwjack provide the
structural stops of the THS.
Rigging pin holes are provided to facilitate the rigging.



EFF :
ALL
 27-41-00



AIJ




Page 1
Feb 01/07

4. Leading
___________________
Particulars
- pitch trim control wheel
radius: 116 mm (4.5669 in.)
travel:
1.87 revolutions A/C nose down (including 0.01 revolution of overstroke)
6.32 revolutions A/C nose up (including 0.01 revolution of overstroke).
- THS maximum authority: 4 deg A/C nose down, 13.5 deg A/C nose up
- stops:
------------------------------------------------------------------------------|
|
THS Deflection
|
|
|-------------------------------------|
|
|
A/C Nose down
| A/C Nose up
|
|---------------------------------------|-------------------|-----------------|
| Max. operational deflection
|
4 deg + 5
| 13.5 deg + 5 |
| (THS input-shaft stops)
|
- 15
|
- 15 |
|---------------------------------------|-------------------|-----------------|
| Computer Limitation
| 3.5 deg + 5
| 11 deg + 25
|
|
|
- 5
|
- 30
|
|---------------------------------------|-------------------|-----------------|
| THS actuator input shaft stops
|
4 deg + 5
| 13.5 deg + 5 |
| (without computer limitation)
|
- 15
|
- 15 |
|---------------------------------------|-------------------|-----------------|
| Stops of actuator ball screwjack
|
4.3 deg
| 13.83 deg
|
------------------------------------------------------------------------------- rate of travel:
Unit capability:
1 deg/s of THS actuator deflection in single-system operation (2 deg/s of
THS actuator delection in two-system operation)
Electrical control rate limitation:
0.3 deg/s when flap position < 0.5 deg
0.7 deg/s when flap position > 0.5 deg
- control wheel torque:
Electric motors jammed: 0.51 m.daN (45.13 lbf.in)
With runaway of electric motors: 0.39 m.daN (34.51 lbf.in).



EFF :
ALL
 27-41-00



AIJ




Page 2
Feb 01/07

THS Mechanical Control


Figure 001

EFF :
ALL
 27-41-00




AIJ




Page 3/4
Feb 01/07

THS Mechanical Control - Location


Figure 002


EFF :
ALL
 27-41-00



AIJ




Page 5
Feb 01/07

Cable Tension Compensator


Figure 003


EFF :
ALL
 27-41-00



AIJ




Page 6
Feb 01/07

THS MECHANICAL CONTROL - ADJUSTMENT/TEST


________________________________________
TASK 27-41-00-820-001
Adjustment of the THS Zero Position
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
0U190360
98D27403500000

1
1
1
1

ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING



EFF :
ALL
 27-41-00



AIJ




Page 501
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-41-00-220-003
27-41-00-820-002
27-44-00-710-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
53-12-11-000-001
53-12-11-400-001
53-32-12-000-002
53-32-12-400-002
27-41-00-991-001
27-41-00-991-002
27-41-00-991-003
27-41-00-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Check of the Zero Adjustment of the THS
Adjustment of the THS Control-Cables Length
Operational Test of the Trimmable Horizontal
Stabilizer Actuator with both (Green and Yellow) and
Individual Hydraulic Systems
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Installation of the Cockpit Floor Panels from FR1
thru FR12
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 501
Fig. 502
Fig. 503
Fig. 504

3. __________
Job Set-up
Subtask 27-41-00-010-054
A. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
zone 312
(2) Open the access door 312AR.

(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


zone 120.
(4) Open the access door 811.



EFF :
ALL
 27-41-00



AIJ




Page 502
Feb 01/11

(5) In the cabin, remove the floor panels 241FF, 241BF (Ref. TASK 53-3212-000-002).
Subtask 27-41-00-860-056
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Pressurize the Green and Yellow hydraulic systems.(Ref. TASK 29-2300-863-001) (Ref. TASK 29-24-00-863-001)
(3) On the center pedestal, make sure that the pitch-trim control-wheels
are set to zero.
(4) Install the PITCH TRIM CONTROL LOCKING (98D27403500000) which locks
the pitch-trim control-wheels.
(5) Make sure that the THS graduation agrees with the zero on the
fuselage.
(6) Make sure that :
- you can install and remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL
INPUT LEVER (0U190360) (10) easily on the input shaft of the THS
actuator.
(Ref. Fig. 501/TASK 27-41-00-991-001)

R
R

(7) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001).
Subtask 27-41-00-020-052
C. Removal of the protective covers
(1) Remove the screws (4) and the washers (3).
(2) Release the fasteners (1) and remove the protective covers (2) and
(5).
(Ref. Fig. 502/TASK 27-41-00-991-002)



EFF :
ALL
 27-41-00



AIJ




Page 503
May 01/10

R
R

Component Location
Figure 501/TASK 27-41-00-991-001



EFF :
ALL
 27-41-00



AIJ




Page 504
Feb 01/07

R
R

Removal/Installation of the Protective Covers


Figure 502/TASK 27-41-00-991-002



EFF :
ALL
 27-41-00



AIJ




Page 505
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 501/TASK 27-41-00-991-001)


Subtask 27-41-00-220-056
A. Check of the dimensions
(1) Make sure that there are 33.6 links 320.7 +11 -2.5 mm (12.6259
+0.4330 -0.0984 in.) between the shaft of the THS actuator input
pinion and the end of the chain.
(Ref. Fig. 503/TASK 27-41-00-991-003)

Subtask 27-41-00-820-050
B. If the dimension you measured is not correct:
- adjust the distance between the shaft of the THS actuator input pinion
and the end of the chain.
Do these steps :
(1) Lock the tension regulator with the RIGGING PIN - THS MECHANICAL
CONTROL (98D27407532000) (11).
(2) Remove the locking clips from the turnbuckles and loosen the cables
(Ref. Detail B).
(3) Put the links of the chain on the pinion until:
- there are 33.6 links 320.7 +11 -2.5 mm (12.6259 +0.4330 -0.0984
in.) between the shaft of the THS actuator input pinion and the end
of the chain.
(4) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000)
(11).
Subtask 27-41-00-220-057
C. Check of the dimension
(1) In the cockpit, remove the floor panel 211EF (Ref. TASK 53-12-11-000001).
(2) Make sure that:
- there are 33.5 links 320 mm (12.5984 in.) between the shaft of the
lower trim assembly and the end of the chain.
(Ref. Fig. 504/TASK 27-41-00-991-004)



EFF :
ALL
 27-41-00



AIJ




Page 506
Feb 01/07

R
R

Chain Adjustment Dimension


Figure 503/TASK 27-41-00-991-003



EFF :
ALL
 27-41-00



AIJ




Page 507
Feb 01/07

R
R

Component Location.
Figure 504/TASK 27-41-00-991-004



EFF :
ALL
 27-41-00



AIJ




Page 508
Feb 01/07

Subtask 27-41-00-820-051
D. If the dimension you measured is not correct:
- adjust the distance between the shaft of the THS actuator input pinion,
and the end of the shaft.
Do these steps:
(1) Lock the tension regulator with the RIGGING PIN - THS MECHANICAL
CONTROL (98D27407532000) (11).
(2) Remove the locking clips from the turnbuckles and loosen the cables
(Ref. Detail B).
(3) Put the links of the chain on the pinion until:
- there are 33.5 links (320 mm (12.5984 in.)) between the pitch trim
shaft, the gearset unit and the end of the shaft.
(4) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) (11)
from the tension regulator.
(5) Adjust the tension of the cables (Ref. TASK 27-41-00-820-002).
Subtask 27-41-00-710-050
E. Do the operational test of the THS actuator (Ref. TASK 27-44-00-710-003).
5. Close-up
________
Subtask 27-41-00-410-056
A. Installation of the protective covers
(1) Install the protective covers (2) and (5).
(2) Tighten the fasteners (1).
(3) Install the washers (3) and the screws (4).
Subtask 27-41-00-942-055
B. Put the aircraft back to the serviceable condition.
(1) On the center pedestal, remove the PITCH TRIM CONTROL LOCKING
(98D27403500000).
(2) Make sure that the zero adjustment is correct (Ref. TASK 27-41-00220-003).



EFF :
ALL
 27-41-00


R 
AIJ




Page 509
Feb 01/07

(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-41-00-410-053
C. Close Access
(1) Install the floor panel 211EF (Ref. TASK 53-12-11-400-001).
(2) Install the floor panels 241FF and 241BF (Ref. TASK 53-32-12-400002).
(3) Close the access doors 811 and 312AR.
(4) Remove the access platform(s).
Subtask 27-41-00-862-053
D. De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-41-00


R 
AIJ




Page 510
Feb 01/07

TASK 27-41-00-720-001
Functional Test of the THS-Actuator Overtravel Related to the Mechanical
Indicator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274400-02
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-41-00-820-001
27-41-00-820-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Adjustment of the THS Zero Position
Adjustment of the THS Control-Cables Length
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System



EFF :
ALL
 27-41-00



AIJ




Page 511
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

31-60-00-860-001
31-60-00-860-002
27-41-00-991-004

EIS Start Procedure


EIS Stop Procedure
Fig. 504

3. __________
Job Set-up
Subtask 27-41-00-860-054
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) (Ref. TASK 29-24-00-863-001).
(4) On the center pedestal, on the ECAM control panel, push the F/CTL key
(on the lower ECAM display unit, the F/CTL page comes into view).
Subtask 27-41-00-865-051
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-41-00



AIJ




Page 512
Feb 01/07

4. Procedure
_________
Subtask 27-41-00-720-051
A. Functional Test of the THS-Actuator Overtravel Related to the Mechanical
Indicator
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Slowly move one of the pitch-trim
control wheels to the 4 deg. DN
stop.

- The 4 Deg DN indication on each


graduated wheel is opposite the
triangle on the center pedestal
index.
- On the lower ECAM display unit, on
the F/CTL page, on the PITCH TRIM
indicator the value shown is included
between 3.5 and 4.3 deg.
- The mechanical input of the THS
actuator is against its stop before
the pitch-trim gearset unit. At the
control wheel, first you must feel
the THS actuator stop then you must
put more force (cable elasticity),
finally you get the pitch-trim
gearset unit stop. On the lower ECAM
display unit, on the F/CTL page, on
the PITCH TRIM indicator: make sure
that the value shown is included
between 3.5 and 4.3 deg.
- In the zone 310, the position mark of
the THS is opposite the 4th upper
mark on the tail cone.

2. Slowly move one of the pitch-trim


control wheels to the 13.5 deg UP
stop.

- The 13.5 UP mark on each graduated


wheel is opposite the triangle of the
center pedestal index.
- On the lower ECAM display, on the
F/CTL page, on the PITCH TRIM
indicator, the value shown is
included between 12.9 and 13.9 deg.
- You touch the stop of the THS
actuator mechanical input before the
stop of the pitch-trim control wheel.
The stop must have almost the same
flexibility as for the DN position.



EFF :
ALL
 27-41-00



AIJ




Page 513
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- In the zone 310, the position mark of
the THS is opposite the 13.5 th lower
mark on the tail cone.
3. Move the pitch-trim control wheel
to the 0 position.

- On the lower ECAM display unit, on


the F/CTL page, on the PITCH TRIM
indicator the value shown is 0 +0.3
-0.3 deg.

4. If the values shown on the F/CTL page are not correct and if you touch the
stop on the pitch-trim gearset unit before the stop of the THS actuator
mechanical input, do these steps:
A. Loosen the cables (Ref. TASK 27-41-00-820-001)(Ref.Subtask
27-41-00-820-050).
B. Remove the chain from the pinion just after the gearset unit.
(Ref. Fig. 504/TASK 27-41-00-991-004)
C. Shift one tooth between the gear just after the pitch-trim gearset unit
and the chain/cable to the THS.
D. Install the chain on the pinion.
E. Adjust the trim control wheel (Ref. TASK 27-41-00-820-002).
F. Adjust the tension of the cable (Ref. TASK 27-41-00-820-002).
G. Make sure that you touch the stop of the THS actuator mechanical input
before the stop of the pitch-trim control wheel.
5. Close-up
________
Subtask 27-41-00-860-055
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) and (Ref. TASK 29-24-00-864-001).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-41-00


R 
AIJ




Page 514
Feb 01/11

(4) Remove the access platform(s).


(5) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-41-00



AIJ




Page 515
Feb 01/07

TASK 27-41-00-730-001
System Test of the THS Actuator Electrical Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE



EFF :
ALL
 27-41-00



AIJ




Page 516
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-41-00-860-050
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU:
- make sure that the FLT CTL/ELAC 1 and FLT CTL/SEC 1 pushbutton
switches are pushed (On these pushbutton switches, the OFF and
FAULT legends are off).
(3) On the overhead panel 24VU:
- make sure that the FLT CTL/ELAC 2 and FLT CTL/SEC 2 pushbutton
switches are pushed (On these pushbutton switches, the OFF and
FAULT legends are off).
(4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(5) On the center pedestal, on the ECAM control panel, push the F/CTL
pushbutton switch. (On the lower ECAM display unit, the F/CTL page
comes into view).



EFF :
ALL
 27-41-00


R 
AIJ




Page 517
Feb 01/07

(6) Pressurize the Green, the Yellow and the Blue hydraulic systems.
(Ref. TASK 29-23-00-863-001) (Ref. TASK 29-24-00-863-001) (Ref. TASK
29-10-00-863-003)
Subtask 27-41-00-010-060
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two srews and remove the protective cover.
Subtask 27-41-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-41-00



AIJ




Page 518
Feb 01/11

4. Procedure
_________
Subtask 27-41-00-730-050
A. System Test of the THS Actuator Electrical Control
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the center pedestal:
- move the pitch-trim control
wheel to the 4 DN position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 3.5 and 4.3
deg.

2. On the center pedestal:


- move the pitch-trim control
wheel to the 13.5 UP position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 12.9 and
13.9 deg.

3. On the panel 23VU:


- release the FLT CTL/ELAC1 and
FLT CTL/SEC1 pushbutton
switches.

On the panel 23VU:


- the OFF legends of the ELAC1 and SEC1
pushbutton switches come on.

4. On the panel 24VU:


- release the FLT CTL/ELAC2 and
FLT CTL/SEC2 pushbutton
switches.

On the panel 24VU:


- the OFF legends of the ELAC2 and SEC2
pushbutton switches come on.

5. On the panel 23VU:


On the panel 23VU:
- push the FLT CTL/SEC1 pushbutton - the OFF legend of the SEC1 pushbutton
switch.
switch goes off.
On the center pedestal:
- the pitch-trim control wheel goes
back to 0 +7 -7 mm (0.0000 +0.2755 0.2755 in.).
On the lower ECAM display unit, on the
F/CTL page:
- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).



EFF :
ALL
 27-41-00



AIJ




Page 519
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------6. On the panel 23VU:
On the panel 23VU:
- release the FLT CTL/SEC1
- the OFF legend of the SEC1 pushbutton
pushbutton switch.
switch comes on.
7. On the center pedestal:
- move the pitch-trim control
wheel to the 4 DN position.
8. On the panel 23VU:
- push the FLT CTL/ELAC1
pushbutton switch.

On the panel 23VU:


- the OFF legend of the ELAC1
pushbutton switch goes off.
On the center pedestal:
- the pitch-trim control wheel goes
back to 0 +7 -7 mm (0.0000 +0.2755 0.2755 in.).
On the lower ECAM display unit, on the
F/CTL page:
- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).

9. On the panel 23VU:


- release the FLT CTL/ELAC1
pushbutton switch.

On the panel 23VU:


- the OFF legend of the ELAC1
pushbutton switch comes on.

10. On the center pedestal:


- move the pitch-trim control
wheel to the 4 DN position.
11. On the panel 24VU:
- push the FLT CTL/ELAC2
pushbutton switch.

On the panel 24VU:


- the OFF legend of the ELAC2
pushbutton switch goes off.
On the center pedestal:
- the pitch-trim control wheel goes
back to 0 +7 -7 mm (0.0000 +0.2755 0.2755 in.).



EFF :
ALL
 27-41-00


R 
AIJ




Page 520
Feb 01/11

R
R
R

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).
12. On the panel 24VU:
- release the FLT CTL/ELAC2
pushbutton switch.

On the panel 24VU:


- the OFF legend of the ELAC2
pushbutton switch comes on.

13. On the center pedestal:


- move the pitch-trim control
wheel to the 4 DN position.
14. On the panel 24VU:
- push the FLT CTL/SEC2
pushbutton switch.

On the panel 24VU:


- the OFF legend of the SEC2 pushbutton
switch goes off.
On the center pedestal:
- the pitch-trim control wheel goes
back to 0 +7 -7 mm (0.0000 +0.2755 0.2755 in.).
On the lower ECAM display unit, on the
F/CTL page:
- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).

R
R
R
15. On the panel 23VU:
- push the FLT CTL/ELAC1 and FLT
CTL/SEC1 pushbutton switches.

On the panel 23VU:


- the OFF legends of the ELAC1 and SEC1
pushbutton switches go off.

16. On the panel 24VU:


- push the FLT CTL/ELAC2
pushbutton switch.

On the panel 24VU:


- the OFF legend of the ELAC2
pushbutton switch goes off.

17. On the center pedestal, on the


ECAM control panel:
- push the HYD pushbutton
switch.

On the lower ECAM display unit:


- the HYD page comes into view.

18. On the panel 40VU:


- release the HYD/PTU/AUTO
pushbutton switch.

On the panel 40VU:


- the OFF legend of the HYD/PTU/AUTO
pushbutton switch comes on.



EFF :
ALL
 27-41-00



AIJ




Page 521
Nov 01/10

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------On the lower ECAM display unit, on the
HYD page:
- the hydraulic pressure of the Green
system decreases to 0 PSI.

R
R
R

19. On the center pedestal, on the


ECAM control panel:
- push the F/CTL pushbutton
switch.

On the lower ECAM display unit:


- the F/CTL page comes into view.

20. On the center pedestal:


- move the pitch trim control
wheel to the 4 DN position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 3.5 and 4.3
deg.

21. On the center pedestal:


- move the pitch-trim control
wheel to the 13.5 UP position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 12.9 and
13.9 deg.

22. On the center pedestal:


- move the pitch-trim control
wheel to the 0 position.

On the lower ECAM display unit, on the


F/CTL page:
- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).

23. On the center pedestal, on the


ECAM control panel:
- push the HYD pushbutton
switch.

On the lower ECAM display unit:


- the HYD page comes into view.

24. On the panel 40VU:


- push the HYD/PTU/AUTO
pushbutton switch.

On the panel 40VU:


- the OFF legend of the HYD/PTU/AUTO
pushbutton switch goes off.
On the lower ECAM display unit, on the
HYD page:
- the hydraulic pressure of the Green
system increases to approximately
3000 PSI.

25. On the panel 50VU:

On the panel 50VU:



EFF :
ALL
 27-41-00



AIJ




Page 522
Nov 01/10

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- release the HYD/LEAK
- the OFF legend of the LEAK
MEASUREMENT VALVES/Y
MEASUREMENT VALVES/Y pushbutton
pushbutton switch.
switch comes on.
On the lower ECAM display unit,
HYD page:
- the hydraulic pressure of the
system stays at approximately
PSI but the Yellow indication
amber.

R
R
R

on the
Yellow
3000
becomes

26. On the center pedestal, on the


ECAM control panel:
- push the F/CTL pushbutton
switch.

On the lower ECAM display unit:


- the F/CTL page comes into view.

27. On the center pedestal:


- move the pitch-trim control
wheel to the 4 DN position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 3.5 and 4.3
deg.

28. On the center pedestal:


- move the pitch-trim control
wheel to the 13.5 UP position.

On the lower ECAM display unit, on the


F/CTL page:
- on the PITCH TRIM indicator the value
shown is included between 12.9 and
13.9 deg.

29. On the center pedestal:


- move the pitch-trim control
wheel to the 0 position.

On the lower ECAM display unit, on the


F/CTL page:
- the PITCH TRIM indicator shows 0 +0.3
-0.3 deg (0.0000 +0.3000 -0.3000
deg).

5. Close-up
________
Subtask 27-41-00-860-051
A. Put the aircraft back to its initial configuration.
(1) On the panel 50VU:
- push the HYD/LEAK MEASUREMENT VALVES/Y pushbutton switch (the OFF
legend of this pushbutton switch goes off).



EFF :
ALL
 27-41-00



AIJ




Page 523
Nov 01/10

(2) Depressurize the aircraft hydraulic systems


(Ref. TASK 29-23-00-864-001) (Ref. TASK 29-24-00-864-001).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-41-00-410-057
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).



EFF :
ALL
 27-41-00


R 
AIJ




Page 524
Nov 01/10

TASK 27-41-00-820-002
Adjustment of the THS Control-Cables Length
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
0U190360

tensiometer
thermometer
warning notice
1 ACCESS PLATFORM 2M (6 FT)
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER



EFF :
ALL
 27-41-00



AIJ




Page 525
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
24-41-00-861-002
24-41-00-862-002
27-41-00-820-003
27-41-44-000-001
27-41-44-400-001
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

R
R

29-24-00-864-001
52-41-00-410-002
53-32-12-000-002
53-32-12-400-002
27-41-00-991-006
27-41-00-991-008

Pre-conditioning through the LP Ground Connection


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Shortening of the THS Control Cable
Removal of the THS Control Cables
Installation of the THS Control Cables
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Close the Avionics Compartment Doors after Access
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 505
Fig. 506

3. __________
Job Set-up
Subtask 27-41-00-862-054
A. Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
Subtask 27-41-00-010-057
B. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
access door 312AR.
(2) Open the access door 312AR.
(3) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 811.
(4) Open the access door 811.



EFF :
ALL
 27-41-00



AIJ




Page 526
Feb 01/07

(5) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 812.
(6) Open the access door 812.
(7) Put an ACCESS PLATFORM 2M (6 FT) in position at the access door 824.
(8) Open the access door 824.
(9) Put an ACCESS PLATFORM 2M (6 FT) in position at the cargo compartment
door 825.
(10) Open the cargo compartment door 825.
(11) Put an ACCESS PLATFORM 2M (6 FT) in position at the cargo compartment
door 826.
(12) Open the cargo compartment door 826.
(13) Remove the cabin floor panels 241FF, 241BF (Ref. TASK 53-32-12-000002).
Subtask 27-41-00-860-053
C. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(2) Make sure that the air conditionning does not operate (Ref. TASK 1233-21-618-001).
(3) Make sure that there is no neon light on, near the cable, in the
cable routing zone.
(4) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(5) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).



EFF :
ALL
 27-41-00


R 
AIJ




Page 527
Feb 01/07

(6) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) and (Ref. TASK 29-24-00-863-001).
(7) Operate the THS fully more than ten times and put it in the zero
position.
(8) On the center pedestal, make sure that the pitch-trim control-wheels
are set to zero.
(9) Put a warning notice on the pitch-trim control wheels to tell persons
not to use the pitch trim.
R
R

(10) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) on the input shaft of the THS Actuator (1).
(11) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) and (Ref. TASK 29-24-00-864-001).
(12) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
4. Procedure
_________
(Ref. Fig. 505/TASK 27-41-00-991-006, 506/TASK 27-41-00-991-008)
Subtask 27-41-00-820-052
A. Adjustment of the THS Control Cables
(1) Measure the ambient temperature with a thermometer.
(2) Use the adjustment graph to find the position of the index of the
tension regulator (2) in relation to the measured ambient
temperature.
(3) Bend the two cables to the same value and release them quickly. When
you release the cables, make sure that the movable pulley bracket of
the tension regulator (2) moves easily (it must not be caught).
(4) Remove the locking clips from the turnbuckles (3).
(5) Turn the 2 turnbuckles (3) by the same value to adjust the tension of
the cable loop so that :
- The position of the index (4) of the tension regulator (2) agrees
with the values found on the graph with a tolerance of + or - 1
graduation (+ or - 5C).
- You can install the locking clips on the turnbuckles (3).



EFF :
ALL
 27-41-00



AIJ




Page 528
May 01/10

R
R

Adjustment of the Cables


Figure 505/TASK 27-41-00-991-006



EFF :
ALL
 27-41-00



AIJ




Page 529
Feb 01/07

R
R

Adjustment Graph
Figure 506/TASK 27-41-00-991-008



EFF :
ALL
 27-41-00



AIJ




Page 530
Feb 01/07

- The pitch-trim control-wheels stay at zero.


(6) If you cannot adjust the control cables, do a visual inspection of
the pulleys and the tension regulator (2).
(a) If they are in good condition:

1
_

Make a mark on each rear cable.

2
_

Pull the cables to the front until the position of the index
agrees with the value found on the graph.

3
_

Keep the cables pulled and make a new mark on each cable then
release the cables.

4
_

Measure the length between two marks of each cable


- if the length is more than 32 mm (1.2598 in.), shorten the
control cables (Ref. TASK 27-41-00-820-003).
- if the length is less than 32 mm (1.2598 in.), replace the
rear control cables (Ref. TASK 27-41-44-000-001) (Ref. TASK
27-41-44-400-001).

(7) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


(5).
(8) Energize the aircraft electrical circuit (Ref. TASK 24-41-00-861002).
(9) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) and (Ref. TASK 29-24-00-863-001).
(10) Operate the THS fully more than ten times and put it in the zero
position.

R
R

(11) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5).
(12) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) and (Ref. TASK 29-24-00-864-001).
(13) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(14) Make sure that the position of the index (4) agrees with the values
found on the graph with a tolerance of + or - 1 graduation (+ or 5C).



EFF :
ALL
 27-41-00



AIJ




Page 531
May 01/10

(15) Make sure that the pitch-trim control-wheels stay at zero.


(16) With a tensiometer, measure the tension of the two cables at a
distance no less than 200 mm (7.8740 in.) from the tension regulator
(2).
Do this step two times to make sure that you get the same tension
value.
(17) Make sure that the tension value is 20 +8 -4 daN (45 +18 -9 lbf).
5. Close-up
________
Subtask 27-41-00-860-057
A. Put the aircraft back to its initial configuration.
(1) Install the locking clips on the turnbuckles (3) of each cable. Make
sure that the number of threads on each side of the end fitting is
the same.
R

(2) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


(5).
(3) Remove the warning notice(s).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-41-00-410-054
B. Close Access
(1) Install the cabin floor panels 241FF, 241BF (Ref. TASK 53-32-12-400002).
(2) Close the access doors 312AR, 811, 812, 824, 825, 826 (Ref. TASK 5241-00-410-002).
(3) Remove the access platform(s).



EFF :
ALL
 27-41-00



AIJ




Page 532
May 01/10

TASK 27-41-00-820-003
Shortening of the THS Control Cable
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Do this procedure when it is no longer possible to adjust the length of the
THS control cables (turnbuckles on the stops).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
0U190360
98D27407532000

thermometer
warning notice
access platforms 2.3 m (7 ft. 7 in.)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 RIGGING PIN - THS MECHANICAL CONTROL



EFF :
ALL
 27-41-00



AIJ




Page 533
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
27-41-00-820-002
27-41-00-991-006
27-41-00-991-008
27-41-00-991-012
27-41-00-991-013

Pre-conditioning through the LP Ground Connection


Adjustment of the THS Control-Cables Length
Fig. 505
Fig. 506
Fig. 507
Fig. 508

3. __________
Job Set-up
Subtask 27-41-00-010-061
A. Get Access
(1) Make sure that the access platforms are in position at the cargo
compartment doors 825 and 826.
(2) Make sure that the cargo compartment doors 825 and 826 are open.
(3) In the zone 241, make sure that the floor panels 241FF and 241BF are
removed.
(4) In the zone 131, make sure that the partition panel 131PW is removed.
Subtask 27-41-00-860-064
B. Aircraft Maintenance Configuration
(1) Make sure that the air conditioning system does not operate
(Ref. TASK 12-33-21-618-001).
(2) Make sure that there is no neon light on, near the cable, in the
cable routing zone.
(3) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).



EFF :
ALL
 27-41-00


R 
AIJ




Page 534
May 01/10

(4) Make sure that the pitch-trim control wheels are in the 0 position.
(5) Put a warning notice in position in the cockpit to tell persons not
to operate the pitch trim.
R
R

(6) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) is in position on the mechanical input of the THS
actuator (1).
(7) Make sure that the RIGGING PIN - THS MECHANICAL CONTROL
(98D27407532000) (11) is in position on the tension regulator (2).
4. Procedure
_________
(Ref. Fig. 505/TASK 27-41-00-991-006, 506/TASK 27-41-00-991-008, 507/TASK
27-41-00-991-012, 508/TASK 27-41-00-991-013)
Subtask 27-41-00-220-062
A. Measurement
(1) Measure the cable zone temperature and the external temperature with
a thermometer. Make sure that the temperature is the same at plus or
minus 2 DEG.C (plus or minus 3.60 DEG.F).
Subtask 27-41-00-820-053
B. Shortening of the THS Control Cables
(1) Adjust the two turnbuckles to the dimension C = 30 mm (1.18 in.).
(2) Find the correct value to cut the cables.
NOTE : Cut the two rear cables by the same value.
____
(a) Use the adjustment graph to find the position of the index of the
tension regulator (2) in relation to the ambient temperature.
(b) Put marks on the two cables where the cable routing is straight
and near the structure.
(c) In the fuselage between two static fairleads, pull the two cables
at the same time until the index of the tension regulator is at
the position found on the graph.
NOTE : Pull the cables down to get the necessary force, and
____
measure the cable travel Y along the aircraft axis.



EFF :
ALL
 27-41-00



AIJ




Page 535
May 01/10

R
R

THS Cable Turnbuckles


Figure 507/TASK 27-41-00-991-012



EFF :
ALL
 27-41-00



AIJ




Page 536
Feb 01/07

R
R

Cable Travel Y


Figure 508/TASK 27-41-00-991-013



EFF :
ALL
 27-41-00



AIJ




Page 537
Feb 01/07

(d) Measure with the marks (on the cables and on the structure) the
cable travel Y on each cable to get the necessary cable length.
(e) For each cable side, subtract 35 mm (1.3779 in.) from the value
measured before.
NOTE : 35 mm (1.3779 in.) is the cable penetration into the
____
terminal stud of one turnbuckle.
(f) The value X (to cut the cable) = Y (cable travel) - 35 mm
(1.3779 in.).
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------| Example:
|
|
Measured cable travel Y for each cable
= 110 mm (4.33 in.)
|
|
Cable penetration into the terminal stud
= 35 mm (1.38 in.)
|
|
Value X to cut the cable
= 110 mm - 35 mm = 75 mm
|
|
(4.33 in. - 1.38 in. = 2.95 in.)|
|-----------------------------------------------------------------------------|
|
Cut the two rear cables by 75 mm (2.95 in.)
|
------------------------------------------------------------------------------(3) Use the measured clearance between the turnbuckles and the static
fairleads to cut the rear cable junction by the calculated value.
NOTE : Cut the two rear cables by the same value.
____
(4) Install the new turnbuckles on the cables (Ref. CFM Cable Fabrication
Man).
(5) Do the adjustment of the THS control-cables length (Ref. TASK 27-4100-820-002).
(6) Make sure that the clearances A between the two turnbuckles and the
fairleads is minimum 25.4 mm (1.00 in.) along the full travel range
of the THS control.
(7) Make sure that the distance B between the ends of the turnbuckles
in each THS control cable is minimum 90 mm (3.54 in.) in all the
positions.
(8) Make sure that the turnbuckles are in the adjustment range of 38.2 mm
(1.50 in.).



EFF :
ALL
 27-41-00



AIJ




Page 538
May 01/10

5. Close-up
________
Subtask 27-41-00-860-065
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the special and standard tools and all other items.



EFF :
ALL
 27-41-00


R 
AIJ




Page 539
Feb 01/07

TASK 27-41-00-820-004
Cutting of the Rear Control Cable of the THS
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Do this procedure when you install a new rear control cable on the THS.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
0U190360
98D27407532000
98D27408650000

thermometer
warning notice
access platforms 2.3 m (7 ft. 7 in.)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 RIGGING PIN - THS MECHANICAL CONTROL
1 DEVICE-PRE RIGGING,CONTROL CABLE



EFF :
ALL
 27-41-00



AIJ




Page 540
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
27-41-00-991-006
27-41-00-991-011

Pre-conditioning through the LP Ground Connection


Fig. 505
Fig. 509

3. __________
Job Set-up
Subtask 27-41-00-010-063
A. Get Access
(1) Make sure that the access platforms are in position at the cargo
compartment doors 825 and 826.
(2) Make sure that the cargo compartment doors 825 and 826 are open.
(3) In the zone 241, make sure that the floor panels 241FF and 241BF are
removed.
(4) In the zone 131, make sure that the partition panel 131PW is removed.
Subtask 27-41-00-860-068
B. Aircraft Maintenance Configuration
(1) Make sure that the air conditioning system does not operate
(Ref. TASK 12-33-21-618-001).
(2) Make sure that there is no neon light on, near the cable, in the
cable routing zone.
(3) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(4) Make sure that the pitch-trim control wheels are in the 0 position.
(5) Put a warning notice in position in the cockpit to tell persons not
to operate the pitch trim.



EFF :
ALL
 27-41-00


R 
AIJ




Page 541
May 01/10

R
R

(6) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (5) is in position on the mechanical input of the THS
actuator (1).
(7) Make sure that the RIGGING PIN - THS MECHANICAL CONTROL
(98D27407532000) (11) is in position on the tension regulator (2).
4. Procedure
_________
(Ref. Fig. 505/TASK 27-41-00-991-006, 509/TASK 27-41-00-991-011)
Subtask 27-41-00-820-055
A. Tension of the Cables

(1) Install the DEVICE-PRE RIGGING,CONTROL CABLE (98D27408650000).


(2) Apply a tension of 32 daN (71.9388 lbf) to the cable linkage.
Subtask 27-41-00-220-063
B. Measurement
(1) Measure the cable zone temperature and the external temperature with
a thermometer. Make sure that the temperature is the same at plus or
minus 2 DEG.C (plus or minus 3.60 DEG.F).
Subtask 27-41-00-820-056
C. Cutting of the Rear Control Cable of the THS
(1) Measure the distance between FR35 and the rear control cable of the
THS.
Make a mark on each cable:
- for the right cable: at 542.9 mm (21.3740 in.) plus or minus 2 mm
(0.0787 in.)
- for the left cable: at 2542.9 mm (100.1142 in.) plus or minus 2 mm
(0.0787 in.)
(2) Release the tension on the cables.

(3) Remove the DEVICE-PRE RIGGING,CONTROL CABLE (98D27408650000).


(4) Use an applicable tool (Ref. CFM Cable Fabrication Man) to cut the
cables at the marks you did before.



EFF :
ALL
 27-41-00



AIJ




Page 542
May 01/10

R
R

Rear THS Control Cables Length Adjustment


Figure 509/TASK 27-41-00-991-011



EFF :
ALL
 27-41-00



AIJ




Page 543
Feb 01/07

R
R

(5) Install the terminal studs on the cable ends (Ref. CFM Cable
Fabrication Man).



EFF :
ALL
 27-41-00



AIJ




Page 544
Aug 01/08

THS MECHANICAL CONTROL - INSPECTION/CHECK


_________________________________________
TASK 27-41-00-210-001
Detailed Visual Inspection of the THS Mechanical Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274100-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

1 ACCESS PLATFORM 2M (6 FT)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R

20-24-11-100-001
20-24-12-200-001
25-54-12-000-001
25-54-12-000-002
25-54-12-400-001
25-54-12-400-002
25-55-11-000-002
25-55-11-400-002
25-55-12-000-001

Cleaning and Protection of the Cables


Check of the Control Cables
Removal of the Forward Cargo-Compartment Partition
FR34
Removal of the Ceiling Panels in the Forward
Cargo-Compartment
Installation of the Forward Cargo-Compartment
Partition FR34
Installation of the Ceiling Panels in the Forward
Cargo-Compartment
Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
Removal of the Aft Cargo-Compartment Partition FR65



EFF :
ALL
 27-41-00



AIJ




Page 601
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------25-55-12-000-002
25-55-12-400-001
25-55-12-400-002
53-12-11-000-001
53-12-11-400-001
53-12-12-000-001
53-12-12-400-001
53-22-12-000-001
53-22-12-400-001
53-32-12-000-002
53-32-12-400-002
27-41-00-991-010

Removal of the Ceiling Panels in the Aft Cargo


Compartment - FR59/FR65
Installation of the Aft Cargo-Compartment Partition
FR65
Installation of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Installation of the Cockpit Floor Panels from FR1
thru FR12
Removal of the Cabin Floor Panels from FR12 thru FR24
Installation of the Cabin Floor Panels from FR12 thru
FR24
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 601

3. __________
Job Set-up
Subtask 27-41-00-010-050
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the zone 121.
(a) Open the access door 811.
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the zone 132.
(a) Open the access door 825.
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the zone 154.
(a) Open the access door 826.
(4) Put the ACCESS PLATFORM 2M (6 FT) in position at the zone 312.
(a) Open the access door 312AR.



EFF :
ALL
 27-41-00


R 
AIJ




Page 602
May 01/11

(5) In the zones 211 and 221, remove the floor panels 211GF, 211KF, 221EF
221LF (Ref. TASK 53-12-11-000-001) and (Ref. TASK 53-12-12-000-001).
(6) In the zones 231 and 241, remove the floor panels 231CF, 231WF,
241BF, 241FF, 241KF (Ref. TASK 53-12-12-000-001) (Ref. TASK 53-22-12000-001) (Ref. TASK 53-32-12-000-002).
(7) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-000-002).
(8) In the zone 131, remove the partition panel 131PW (Ref. TASK 25-5412-000-001).
(9) In the zones 151 and 161, remove the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK
25-55-12-000-002).
(10) In the zone 161, remove the partition panels 161DW, 162DW (Ref. TASK
25-55-12-000-001).
4. Procedure
_________
Subtask 27-41-00-210-050
A. Visual Inspection of the THS Mechanical Control (between FR8 and FR71)
(1) Make sure that all the nuts and the bolts are tight or safetied at
each attachment point.
(2) Make sure that there is no corrosion on the bolts, the nuts and the
washers.
R

(3) Make sure that the turnbuckles are safetied with the lock clips.

(4) Make sure that the identification plates of all the components are
attached correctly.

(5) Make sure that the front chain and the cable move freely.

(6) Make sure that the front chain and the cable do not touch the
structure.

(7) Make sure that the cables are not damaged (Ref. TASK 20-24-12-200001)

(8) Make sure that there is no corrosion on the cables (Ref. TASK 20-2411-100-001).



EFF :
ALL
 27-41-00



AIJ




Page 603
May 01/10

Subtask 27-41-00-210-058
B. Visual inspection of the Rear THS Control Cable (between FR71 and the THS
actuator)
(Ref. Fig. 601/TASK 27-41-00-991-010)

(1) Removal of the Protective Covers


(a) Remove the screws (4) and the washers (3).
(b) Release the fasteners (1) and remove the protective covers (2)
and (5).
(2) Do an inspection of the THS control cable between the tension
regulator and the chain linkage.
(3) Make sure that the chain and the cable move freely.
(4) Make sure that the chain and the cable do not touch the structure (no
marks on the fasteners).
(5) Make sure that the chain that controls the THS actuator is in the
correct condition.
(6) Make sure that the cables are not damaged (Ref. TASK 20-24-12-200001).
(7) Make sure that there is no corrosion on the cables (Ref. TASK 20-2411-100-001).
(8) Installation of the Protective Covers
(a) Install the protective covers (2) and (5).
(b) Tighten the fasteners (1).
(c) Install the washers (3) and the screws (4).



EFF :
ALL
 27-41-00



AIJ




Page 604
Feb 01/07

R
R

Removal/Installation of the Protective Covers.


Figure 601/TASK 27-41-00-991-010



EFF :
ALL
 27-41-00



AIJ




Page 605
Feb 01/07

5. Close-up
________
Subtask 27-41-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) In the zones 211 and 221, install the floor panels 211GF, 211KF,
221EF 221LF (Ref. TASK 53-12-11-400-001) (Ref. TASK 53-12-12-400001).
(3) In the zones 231 and 241, install the floor panels 231CF, 231WF,
241BF, 241FF, 241KF (Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12400-002).
(4) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC
(Ref. TASK 25-54-12-400-002).
(5) In the zone 131, install the partition panel 131PW (Ref. TASK 25-5412-400-001).
(6) In the zones 151 and 161, install the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC. (Ref. TASK 25-55-11-400-002) (Ref. TASK
25-55-12-400-002).
(7) In the zone 161, install the partition panels 161DW, 162DW (Ref. TASK
25-55-12-400-001).
(8) Close the access doors 811, 825, 826, 312AR.
(9) Remove the access platform(s).



EFF :
ALL
 27-41-00


R 
AIJ




Page 606
Feb 01/07

TASK 27-41-00-210-002
Visual Inspection of the Pitch-Trim Control Wheel Indicators
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Do a check for cracks on the pitch-trim control wheel indicators.
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-41-41-000-001
27-41-41-400-001
29-10-00-864-001
29-23-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Control Mechanism-Pitch Trim
Installation of the Control Mechanism-Pitch Trim
Depressurize the Green Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-41-00



AIJ




Page 607
Feb 01/07

3. __________
Job Set-up
Subtask 27-41-00-865-054
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU LIGHTING/ICE AND STBY/COMP/LIGHT
1LF
H04
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
122VU LIGHTING/INSTL LT/GLARE/SHLD
5LF
Y05
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
122VU LIGHTING/INSTL LT/OVHD/PNL
3LF
Y03
Subtask 27-41-00-860-066
B. Aircraft Maintenance Configuration
(1) On the panel 111VU, turn the INTEG LT/MAIN PNL & PED potentiometer to
BRT to make crack detection easier.
(2) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(3) Pressurize the Yellow and the Green hydraulic systems (Ref. TASK 2923-00-863-001).
(4) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(5) On the center pedestal on the ECAM control panel, push the F/CTL
pushbutton switch (Ref. TASK 31-60-00-860-001).
(6) Make sure that on the lower display unit (DU) of the ECAM, the F/CTL
page comes on.



EFF :
ALL
 27-41-00


R 
AIJ




Page 608
Feb 01/07

4. Procedure
_________
Subtask 27-41-00-210-056
A. Visual Inspection of the Pitch-Trim Control Wheel Indicators for Cracks
(1) On the center pedestal, turn the CAPT or F/O pitch-trim control wheel
to the nose DN stop position.
(2) On the CAPT side:
- make sure that there are no cracks on the pitch-trim control wheel
indicator while you turn the pitch-trim control wheel to the nose
UP stop position.
(3) If you find cracks(s), replace the pitch-trim control wheel indicator
(Ref. TASK 27-41-41-000-001) (Ref. TASK 27-41-41-400-001).
(4) On the F/O side:
- make sure that there are no cracks on the pitch-trim control wheel
indicator while you turn the pitch-trim control wheel to the nose
DN stop position.
(5) If you find cracks(s), replace the pitch-trim control wheel indicator
(Ref. TASK 27-41-41-000-001) (Ref. TASK 27-41-41-400-001).
5. Close-up
________
Subtask 27-41-00-860-067
A. Put the Aircraft Back to its Initial Configuration
(1) Turn the pitch-trim control wheel to the neutral position.
(2) Turn the INT LT/MAIN PNL & PED potentiometer to OFF.
(3) Depressurize the Yellow and Green hydraulic systems (Ref. TASK 29-2400-864-001) (Ref. TASK 29-10-00-864-001)
(4) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002)
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-41-00


R 
AIJ




Page 609
Feb 01/07

TASK 27-41-00-220-001
Check of the Cable Tension Regulator of the THS Trim Control (Pointer in the
Limits)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : MAKE SURE THAT THE AIRCRAFT IS IN THE TEMPERATURE CONDITIONS (STABLE
_______
AMBIENT TEMPERATURE) SPECIFIED IN THE AIRCRAFT MAINTENANCE
CONFIGURATION PARAGRAPH.
CHANGES IN THE TEMPERATURE CAN CAUSE INCORRECT MEASUREMENTS.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274142-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
0U190360

thermometer
1 ACCESS PLATFORM 2M (6 FT)
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER



EFF :
ALL
 27-41-00



AIJ




Page 610
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-33-21-618-001
24-41-00-861-002
24-41-00-862-002
27-41-00-820-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
R
R

52-41-00-410-002
27-41-00-991-007
27-41-00-991-009

Pre-conditioning through the LP Ground Connection


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Adjustment of the THS Control-Cables Length
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Close the Avionics Compartment Doors after Access
Fig. 602
Fig. 603

3. __________
Job Set-up
Subtask 27-41-00-010-051
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
access door 312AR.
(a) Open the access door 312AR.
(2) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 811.
(a) Open the access door 811 (Ref. TASK 52-41-00-410-002).
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 812.
(a) Open the access door 812.
(4) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 824.
(a) Open the access door 824.



EFF :
ALL
 27-41-00



AIJ




Page 611
Feb 01/07

(5) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 825.
(a) Open the access door 825.
(6) Put the ACCESS PLATFORM 2M (6 FT) in position at the access door 826.
(a) Open the access door 826.
Subtask 27-41-00-860-058
B. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).
(2) Make sure that the air conditioning is de-energized (Ref. TASK 12-3321-618-001).
(3) The cable routing area must not be lighten by neon located close the
cable itself.
(4) Let the temperature in the aircraft become stable for a period of
three hours before you start the adjustment.
NOTE : You can do other maintenance actions during the three hour
____
period if they do not change the ambient temperature (No
source of heat or cold, aircraft not energized, no air
conditioning, no neon light sources in the cable routing
area).
(5) The ambiant temperature must be within the range of 0 deg.C (32.00
deg.F), 40 deg.C (104.00 deg.F).
4. Procedure
_________
R

(Ref. Fig. 602/TASK 27-41-00-991-007)


Subtask 27-41-00-220-050
A. Check of the Cable Tension Regulator of the THS Trim Control (Pointer in
the Limits)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) and (Ref. TASK 29-24-00-863-001).



EFF :
ALL
 27-41-00



AIJ




Page 612
Feb 01/07

R
R

THS Actuator - Rigging


Figure 602/TASK 27-41-00-991-007



EFF :
ALL
 27-41-00



AIJ




Page 613
Feb 01/07

(3) Operate the THS more than ten times and put it in the zero position.
(4) Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) (1) on the input shaft of the THS actuator.
(5) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001).
(6) De-energize the aircraft electrical circuit (Ref. TASK 24-41-00-862002).
(7) Put a warning notice on the pitch-trim control wheels to tell persons
not to use the pitch trim.
(8) Bend the two cables to the same value and release them quickly. When
you release the cables, make sure that the movable pulley bracket of
the tension regulator moves easily (it must not be caught).
(9) Measure the ambient temperature with a thermometer.
R
R

(10) Use the adjustment graph to find the position of the index (value in
degree C) in relation to the measured ambient temperature.
(Ref. Fig. 603/TASK 27-41-00-991-009)

R
R
R

(11) On the tension regulator, make sure that the position of the index
agrees with the value found on the graph (value in degree C) with a
tolerance of + or - 1 graduation (+ or - 5 degree C).

R
R

NOTE : 1 graduation on the tension regulator corresponds to 5 degree


____
C.

R
(12) If the result of the check is no correct, adjust the THS cable length
(Ref. TASK 27-41-00-820-002).
5. Close-up
________
Subtask 27-41-00-860-059
A. Put the aircraft back to its initial configuration.
(1) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360).
(2) Remove the warning notice.



EFF :
ALL
 27-41-00



AIJ




Page 614
Nov 01/10

R
R

Adjustment Graph
Figure 603/TASK 27-41-00-991-009



EFF :
ALL
 27-41-00



AIJ




Page 615
Feb 01/07

Subtask 27-41-00-410-051
B. Close Access
(1) Close the access doors 312AR, 824, 825, 826, 811, 812 (Ref. TASK 5241-00-410-002).
(2) Remove the access platform(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-41-00


R 
AIJ




Page 616
Feb 01/07

TASK 27-41-00-220-002
Check of the Correct Tension of the THS Mechanical Control Cables
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274100-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

tensiometer
warning notice
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE



EFF :
ALL
 27-41-00



AIJ




Page 617
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
R
R
R
R

25-54-12-000-002
25-54-12-400-002
25-55-11-000-002
25-55-11-400-002
27-41-00-820-002
27-41-42-000-001
27-41-42-400-001
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
52-30-00-860-001
52-30-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Ceiling Panels in the Forward
Cargo-Compartment
Installation of the Ceiling Panels in the Forward
Cargo-Compartment
Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
Adjustment of the THS Control-Cables Length
Removal of the Cable Tension Regulator
Installation of the Cable Tension Regulator
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up
Subtask 27-41-00-860-060
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Green and Yellow hydraulic systems with the electric
pump (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-23-00-863-001).



EFF :
ALL
 27-41-00



AIJ




Page 618
May 01/11

(3) Safety Precautions


(a) On the center pedestal, make sure that the pitch-trim
control-wheels are set to zero.
(b) Put a warning notice on the pitch-trim control wheels to tell
persons not to use the pitch trim.
(c) Put a warning notice on the rudder pedals (CAPT and F/O) to tell
persons not to operate them.
Subtask 27-41-00-010-052
B. Get Access
(1) Open the FWD and AFT cargo compartment doors (Ref. TASK 52-30-00-860001).
R

(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(3) Remove the ceiling panel 131BC in the cargo compartment (Ref. TASK
25-54-12-000-002).
(4) Remove the ceiling panel 151BC in the cargo compartment (Ref. TASK
25-55-11-000-002).
4. Procedure
_________
Subtask 27-41-00-220-051
A. Check of the Correct Tension of the THS Mechanical Control Cables
(1) Operate the THS fully five times and put it in the zero position.
(2) In the cargo compartment, you can see four cables:
- the two cables at right are the THS control cables
- the two cables at left are the rudder control cables.
(3) Make sure that the movable pulley bracket of the tension regulator is
not on a stop.
(4) Bend the two THS cables at right to the same value and release them
quickly. When you release the cables, make sure that the movable
pulley bracket of the tension regulator moves easily (it must not be
caught).



EFF :
ALL
 27-41-00



AIJ




Page 619
Feb 01/11

(5) With a tensiometer, measure the tension of each cable, in each cargo
compartment, between two static fairleads.
Repeat this operation twice to valid the measurement.
NOTE : The tension value of each cable is 20 +8 -4 daN (45 +18 -9
____
lbf).
(6) If the result of the check is not correct, change the springs of the
cable tension regulator (Ref. TASK 27-41-42-000-001), (Ref. TASK 2741-42-400-001). Adjust the cables (Ref. TASK 27-41-00-820-002).
(7) Check the tension of the cables.
5. Close-up
________
Subtask 27-41-00-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the ceiling panel 131BC in the cargo compartment (Ref. TASK
25-54-12-400-002).
(3) Install the ceiling panel 151BC in the cargo compartment (Ref. TASK
25-55-11-400-002).
(4) Close the FWD and AFT cargo compartment doors (Ref. TASK 52-30-00860-002).
(5) Remove the warning notices
(6) Remove the access platform(s).
Subtask 27-41-00-860-061
B. Put the aircraft back to its initial configuration.
(1) Depressurize the Green and Yellow hydraulic system (Ref. TASK 29-2300-864-001).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-41-00


R 
AIJ




Page 620
Feb 01/07

TASK 27-41-00-220-003
Check of the Zero Adjustment of the THS
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE



EFF :
ALL
 27-41-00



AIJ




Page 621
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-41-00-010-059
A. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(a) Open the access door 822.
(b) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.

(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
access door 312AR.
(a) Open the access door 312AR.

(3) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position in the zone
310.



EFF :
ALL
 27-41-00



AIJ




Page 622
Feb 01/11

Subtask 27-41-00-865-052
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-41-00-860-062
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002)
(2) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
(3) On the panel 23VU, release the FLT CTL/SEC 1 and FLT CTL/ELAC 1
pushbutton switches (on these pushbutton switches, the OFF legends
come on).
(4) On the panel 24VU, release the FLT CTL/ELAC 2 and the FLT CTL/SEC 2
pushbutton switches (on these pushbutton switches, the OFF legends
come on).
(5) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL
pushbutton switch (on the lower ECAM display unit, the F/CTL page
comes into view).



EFF :
ALL
 27-41-00


R 
AIJ




Page 623
Feb 01/07

4. Procedure
_________
Subtask 27-41-00-866-054
A. Check of the Zero Adjustment of the THS
(1) On the center pedestal, move the THS from the zero position to x
degrees Nose up with the pitch-trim control-wheel.
(2) On the panel 23VU, push the FLT CTL/SEC 1 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(3) Make sure that the pitch-trim control-wheels move to zero (0 mark on
the pitch-trim control-wheels, opposite the triangle on the center
pedestal).
(4) On the F/CTL page of the lower ECAM display unit:
- the PITCH TRIM indicator shows 0 plus or minus 0.3.
(5) On the tail cone, make sure that the THS is opposite the 0 mark.
(6) On the panel 23VU, release the FLT CTL/SEC 1 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
(7) On the center pedestal, move the THS from the zero position with the
pitch-trim control-wheel.
(8) On the panel 24VU, push the FLT CTL/ELAC 2 pushbutton switch (on the
pushbutton switch, the OFF legend goes off).
(9) Make sure that the pitch-trim control-wheels move to zero (the 0 mark
on the pitch-trim control-wheels is opposite the triangle on the
center pedestal).
(10) On the F/CTL page of the lower ECAM display unit:
- make sure that the PITCH TRIM indicator shows 0 plus or minus
0.3.
(11) On the tail cone, make sure that the THS is opposite the 0 mark.
(12) On the panel 24VU, release the FLT CTL/ELAC 2 pushbutton switch (on
this pushbutton switch, the OFF legend comes on).
(13) On the center pedestal, move the THS from the zero position to x
degrees Nose up with the pitch-trim control-wheel.



EFF :
ALL
 27-41-00


R 
AIJ




Page 624
Feb 01/07

(14) On the panel 24VU, push the FLT CTL/SEC 2 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(15) Make sure that the pitch-trim control-wheels move to zero (0 mark on
the pitch-trim control-wheels opposite the triangle on the center
pedestal).
(16) On the F/CTL page of the lower ECAM display unit:
- make sure that the PITCH TRIM indicator shows 0 plus or minus
0.3.
(17) On the tail cone, make sure that the THS is opposite the 0 mark.
5. Close-up
________
Subtask 27-41-00-860-063
A. Put the aircraft back to its initial configuration.
(1) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) On the panel 23VU, push the FLT CTL/SEC 1 and FLT CTL/ELAC 1
pushbutton switches (on these pushbutton switches, the OFF legends go
off).
(3) On the panel 24VU, push the FLT CTL/ELAC 2 pushbutton switch (on this
pushbutton switch, the OFF legend goes off).
(4) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-41-00-410-055
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.



EFF :
ALL
 27-41-00


R 
AIJ




Page 625
Feb 01/07

(4) Close the access door 312AR.


(5) Remove the access platform(s).



EFF :
ALL
 27-41-00



AIJ




Page 626
Feb 01/07

TASK 27-41-00-210-003
Visual Inspection and Lubrication of the Rear THS control cable (between FR71
and the THS actuator)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
R
R

Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-41-00



AIJ




Page 627
May 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-24-11-100-001
20-24-12-200-001
27-41-00-991-010

Cleaning and Protection of the Cables


Check of the Control Cables
Fig. 601

3. __________
Job Set-up
Subtask 27-41-00-010-062
A. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
zone 312.
(2) Open the access door 312AR.
4. Procedure
_________
(Ref. Fig. 601/TASK 27-41-00-991-010)
Subtask 27-41-00-020-053
A. Removal of the Protective Covers
(1) Remove the screws (4) and the washers (3).
(2) Release the fasteners (1) and remove the protective covers (2) and
(5).
Subtask 27-41-00-210-057
B. Visual Inspection of the Rear THS Control Cable
(1) Do an inspection the THS control cable between the tension regulator
and the chain linkage.
(2) Make sure that the chain and the cable move freely.
(3) Make sure that the chain and the cable do not touch the structure (no
marks on the fasteners).



EFF :
ALL
 27-41-00


R 
AIJ




Page 628
May 01/11

(4) Make sure that the chain that controls the THS actuator is in the
correct condition.
(5) Make sure that the cables are not damaged (Ref. TASK 20-24-12-200001).
(6) Make sure that there is no corrosion on the cables (Ref. TASK 20-2411-100-001).
R
R

(7) Clean the control cable in this area with a MISCELLANEOUS (Material
No. 19-003).
(8) Lubricate the control cable with COMMON GREASE (Material No. 04-004).
Subtask 27-41-00-420-051
C. Installation of the Protective Covers
(1) Install the protective covers (2) and (5).
(2) Tighten the fasteners (1).
(3) Install the washers (3) and the screws (4).
5. Close-up
________
Subtask 27-41-00-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).



EFF :
ALL
 27-41-00



AIJ




Page 629
May 01/11

CONTROL MECHANISM - PITCH TRIM - REMOVAL/INSTALLATION


_____________________________________________________
TASK 27-41-41-000-001
Removal of the Control Mechanism-Pitch Trim
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
0U190360

blanking caps
circuit breaker(s) safety clip(s)
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-82-12-000-001
23-13-13-000-001
23-51-12-000-001
29-24-00-863-001

29-24-00-864-001
34-41-12-000-001
34-52-12-000-001
27-41-41-991-002
27-41-41-991-001
27-41-41-991-003

Removal of the MCDU (3CA1,3CA2,3CA3)


Removal of the Radio Management Panel (RMP) (1RG1,
1RG2, 1RG3)
Removal of the Audio Control Panel (ACP) (2RN1, 2RN2,
2RN3, 2RN4, 2RN5)
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the Weather Radar Control Unit (3SQ)
Removal of the ATC/TCAS Control Unit
Fig. 401
Fig. 402
Fig. 403



EFF :
ALL
 27-41-41



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-41-41-860-050
A. Aircraft Maintenance Configuration
(1) Pressurize the Yellow hydraulic system (Ref. TASK 29-24-00-863-001).
(2) Put the THS control in the 0 position.
(3) Depressurize the Yellow hydraulic system (Ref. TASK 29-24-00-864001).
Subtask 27-41-41-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
310.
(2) Open the access door 312AR.
Subtask 27-41-41-480-050

C. Install the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


(6) on the input lever of the screw jack (5) (Ref. Details D and E).
(Ref. Fig. 401/TASK 27-41-41-991-002)
Subtask 27-41-41-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CKPT/DOME
1LE
H08
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
122VU LIGHTING/FLOOD/CTR INST/PNL
2LE
Z04



EFF :
ALL
 27-41-41



AIJ




Page 402
Feb 01/11

R
R

Pitch Trim Control Mechanism


Figure 401/TASK 27-41-41-991-002



EFF :
ALL
 27-41-41



AIJ




Page 403
Feb 01/07

Subtask 27-41-41-010-052
E. Remove the peripheral equipments
(1) Remove the MCDUs (3CA1 and 3CA2) (Ref. TASK 22-82-12-000-001).
(2) Remove the radio management panels (1RG1 and 1RG2) (Ref. TASK 23-1313-000-001).
(3) Remove the audio control panels (2RN1 and 2RN2) (Ref. TASK 23-51-12000-001).
(4) Remove the weather radar control unit (3SQ) (Ref. TASK 34-41-12-000001).
(5) Remove the ATC control unit (3SH) (Ref. TASK 34-52-12-000-001).
(6) Remove the panels 111VU and 112VU.
(Ref. Fig. 402/TASK 27-41-41-991-001)

NOTE : The removal procedure is the same for the panels 111VU and
____
112VU.
(a) Release the fasteners of the panel (1) and disengage the panel
(1) from its housing.
(b) Disconnect the connector (3) from the panel (1).
(c) Remove the panel (1).
(d) Put blanking caps on the connectors (2) and (3).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-41-41-991-002, 403/TASK 27-41-41-991-003)


Subtask 27-41-41-020-051
A. Removal of the Pitch Trim Control Mechanism
(1) Remove the screws (13).
(2) Remove the plates (14), (15), (17) and (27).
(3) Cut and remove the lockwire from the screws (18), (19) and (21).
(4) Remove the screws (18), (19) and (21) and the washers (16).



EFF :
ALL
 27-41-41



AIJ




Page 404
Feb 01/07

R
R

Panels 111VU and 112VU


Figure 402/TASK 27-41-41-991-001



EFF :
ALL
 27-41-41



AIJ




Page 405
Feb 01/07

R
R

Pitch Trim Control Mechanism


Figure 403/TASK 27-41-41-991-003



EFF :
ALL
 27-41-41



AIJ




Page 406
Feb 01/07

(5) Remove the ribs (20) and (26).


(6) Remove the screws (22) and the washers (23).
(7) Release the plates (24) and (25).
(8) Remove the cotter pins (12), the nuts (11) and the washers (10).
(9) Remove the wheels (29) and the indicators (30) and (35).
(10) Remove the gears (31) and (34) and the spacers (32).
(11) Remove the shaft (28) and the bearings (33).



EFF :
ALL
 27-41-41



AIJ




Page 407
Feb 01/07

TASK 27-41-41-400-001
Installation of the Control Mechanism-Pitch Trim
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

corrosion-resistant steel lockwire dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-41-41



AIJ




Page 408
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

12
12

cotter pins
cotter pins

27-41-01 01A-010
27-41-01 01B-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-82-12-400-002
23-13-13-400-001
23-51-12-400-001
24-41-00-861-002
24-41-00-862-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
34-41-12-400-001
34-52-12-400-001
27-41-41-991-002
27-41-41-991-001
27-41-41-991-003
27-41-41-991-004

Installation of the MCDU (3CA1,3CA2,3CA3)


Installation of the Radio Management Panel (RMP)
(1RG1, 1RG2, 1RG3)
Installation of the Audio Control Panel (ACP) (2RN1,
2RN2, 2RN3, 2RN4, 2RN5)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Installation of the Weather Radar Control Unit (3SQ)
Installation of the ATC/TCAS Control Unit
Fig. 401
Fig. 402
Fig. 403
Fig. 404



EFF :
ALL
 27-41-41



AIJ




Page 409
Feb 01/11

3. __________
Job Set-up
Subtask 27-41-41-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the THS control is in the 0 position.
(2) Make sure that the Yellow hydraulic system (Ref. TASK 29-24-00-864001) is depressurized.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at zone 310.
(4) Make sure that the access door 312AR is open.
Subtask 27-41-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CKPT/DOME
1LE
H08
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
122VU LIGHTING/FLOOD/CTR INST/PNL
2LE
Z04
4. Procedure
_________
(Ref. Fig. 401/TASK 27-41-41-991-002, 403/TASK 27-41-41-991-003)
Subtask 27-41-41-640-050
A. Apply COMMON GREASE (Material No. 04-004) on the components.
Subtask 27-41-41-420-050
B. Installation of the Pitch Trim Control Mechanism
(1) Before the installation, make sure that the position of the green
band / CG (Center of Gravity) scale of the pitch-trim wheel indicator
is in accordance with the table given in the figure.
(Ref. Fig. 404/TASK 27-41-41-991-004)
(2) Install the shaft (28) and the bearings (33) on the structure.



EFF :
ALL
 27-41-41



AIJ




Page 410
Feb 01/11

R
R

Position of the Green Band / CG (Center of Gravity) Scale


Figure 404/TASK 27-41-41-991-004



EFF :
ALL
 27-41-41



AIJ




Page 411
May 01/07

(3) Install the spacers (32).


(4) Install the gear (31) and the indicator (30) on the CAPT side.
NOTE : During the installation, align the 0 mark of the indicator
____
with the fixed pointer of the pedestal index (Ref. Detail C).
(5) Install the gear (34) and the indicator (35) on the F/O side.
(6) Install the wheels (29).
NOTE : During the installation, align the white strip center of the
____
wheel with the fixed pointer of the pedestal index (Ref.
Detail C) with a maximum clearance of 2.54 mm (0.1000 in.).
(7) Install the washers (10), the nuts (11) and the new cotter pins (12)
.
(8) Install the rib (20) on the structure.
(9) Install the washers (16) and the screws (18), (19), (21).
(10) Install the rib (26) on the structure.
(11) Install the washers (16) and the screws (18), (19), (21).
(12) Safety the screws (18), (19) and (21) with corrosion-resistant steel
lockwire dia 0.8 mm (0.03 in.).
(13) Put the plate (24) in the correct position on the structure.
(14) Install the washers (23) and the screws (22).
(15) Put the plate (25) in correct position on the structure.
(16) Install the washers (23) and the screws (22).
(17) Install the plates (14), (15), (17) and (27).
(18) Install the screws (13).
Subtask 27-41-41-080-050
R

C. Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) (6)


from the input lever of the screw jack (5) (Ref. Details D and E).
(Ref. Fig. 401/TASK 27-41-41-991-002)



EFF :
ALL
 27-41-41



AIJ




Page 412
Feb 01/11

Subtask 27-41-41-866-050
D. Test
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow and Green hydraulic systems (Ref. TASK 29-2400-863-001) (Ref. TASK 29-23-00-863-001).
(3) On the overhead panel 23VU, release the FLT CTL/ELAC1 and FLT
CTL/SEC1 pushbutton switches (on these pushbutton switches, the OFF
legends come on).
(4) On the overhead panel 24VU, release the FLT CTL/ELAC2, FLT CTL/SEC2
and FLT CTL/SEC3 pushbutton switches (on these pushbutton switches,
the OFF legends come on).
(5) Slowly move one of the pitch-trim control wheels to the DN stop (the
motion must be smooth and constant over all the travel).
(6) On the overhead panel 24VU, push the FLT CTL/ELAC2 pushbutton switch.
(a) The OFF legend goes off.
(b) After 6 seconds, the pitch-trim control wheel goes back to the 0
position.
5. Close-up
________
Subtask 27-41-41-860-052
A. Put the aircraft back to its initial configuration.
(1) On the overhead panel 23VU, push the FLT CTL/ELAC1 and FLT CTL/SEC1
pushbutton switches (on these pushbutton switches, the OFF legends go
off).
(2) On the overhead panel 24VU, push the FLT CTL/SEC2 and FLT CTL/SEC3
pushbutton switches (on these pushbutton switches, the OFF legends go
off).
(3) Depressurize the Yellow and Green hydraulic systems (Ref. TASK 29-2300-864-001) (Ref. TASK 29-24-00-864-001).



EFF :
ALL
 27-41-41


R 
AIJ




Page 413
Feb 01/11

Subtask 27-41-41-410-054
B. Install the peripheral equipments
(1) Install the panels 111VU and 112VU.
(Ref. Fig. 402/TASK 27-41-41-991-001)
NOTE : The installation procedure is the same for the panels 111VU
____
and 112VU.
(a) Remove the blanking caps from the connectors (2) and (3).
(b) Connect the connector (2) to the panel (1).
(c) Install the panel (1) on the structure.
(d) Fully tighten the fasteners of the panel (1).
(2) Install the MCDUs (3CA1 and 3CA2) (Ref. TASK 22-82-12-400-002).
(3) Install the radio management panels (1RG1 and 1RG2) (Ref. TASK 23-1313-400-001).
(4) Install the audio control panels (2RN1 and 2RN2) (Ref. TASK 23-51-12400-001).
(5) Install the weather radar control unit (3SQ) (Ref. TASK 34-41-12-400001).
(6) Install the ATC control unit (3SH) (Ref. TASK 34-52-12-400-001).
Subtask 27-41-41-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
4LF, 1LE, 2LE
Subtask 27-41-41-710-050
D. Do an operational test of the panels 111VU and 112VU.
(1) Operate the light adjustment knobs of the panels 111VU and 112VU.
(2) Make sure that the light intensity of the panels 13VU, 130VU, 131VU
and 48VU changes.



EFF :
ALL
 27-41-41


R 
AIJ




Page 414
Feb 01/11

Subtask 27-41-41-410-053
E. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
Subtask 27-41-41-862-050
F. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-41-41



AIJ




Page 415
Feb 01/11

REGULATOR - CABLE TENSION - REMOVAL/INSTALLATION


________________________________________________
TASK 27-41-42-000-001
Removal of the Cable Tension Regulator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
0U190360
98D27403500000
98D27407532000

1
1
1
1

circuit breaker(s) safety clip(s)


warning notices
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING
RIGGING PIN - THS MECHANICAL CONTROL

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
53-32-12-000-002
27-41-42-991-002
27-41-42-991-001

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Removal of the Cabin Floor Panels
Fig. 401
Fig. 402



EFF :
ALL
 27-41-42



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-41-42-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Remove the access panel 311AL and open the access door 312AR.
Subtask 27-41-42-860-051
B. Aircraft Maintenance Configuration
(1) Turn the pitch-trim control wheel in the cockpit and put the THS
actuator near to the zero position.
(2) Lock the pitch trim control wheel with the PITCH TRIM CONTROL LOCKING
(98D27403500000).
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
Subtask 27-41-42-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-41-42-480-050
D. Safety Precaution
(1) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator.
(2) Put the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) in the
rocker assembly of the regulator.



EFF :
ALL
 27-41-42



AIJ




Page 402
Feb 01/11

Subtask 27-41-42-860-050
E. Aircraft Maintenance Configuration
(1) Depressurize the Green and the Yellow hydraulic systems (Ref. TASK
29-10-00-864-001) / (Ref. TASK 29-10-00-864-002).
(2) Put the warning notices in position to tell persons not to pressurize
the Green and the Yellow hydraulic systems.
Subtask 27-41-42-010-051
F. Get Access
(1) Remove the floor panels 241FF, 241BF (Ref. TASK 53-32-12-000-002).
(2) Remove the locking clips (30) and release the turnbuckles (31).
(Ref. Fig. 401/TASK 27-41-42-991-002)

NOTE : Make sure that there is no tension on the THS control cables.
____
4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-41-42-991-001)


Subtask 27-41-42-020-050
A. Removal of the Cable Tension Regulator
(1) Remove the cover (2) from the regulator (8) as follows:
(a) Remove the bolts (3) and the washers (4) from the connection of
the cover (2) to the regulator (8).
(b) Remove the bolts (5) and the washers (6) from the connection of
the cover (2) to the cover assembly (1).
(c) Disconnect the cover (2) from the regulator (8) and the cover
assembly (1).
(2) Disconnect the springs (10) from the bolts (9).
(3) Remove the rigging pin 98D27407532000 from the rocker assembly (15)
of the regulator (8).



EFF :
ALL
 27-41-42



AIJ




Page 403
Feb 01/07

R
R

Location of the Turnbuckles


Figure 401/TASK 27-41-42-991-002



EFF :
ALL
 27-41-42



AIJ




Page 404
Feb 01/07

R
R

Cable Tension Regulator


Figure 402/TASK 27-41-42-991-001



EFF :
ALL
 27-41-42



AIJ




Page 405
Feb 01/07

(4) Remove the rocker assembly (15) from the regulator (8) as follows:
(a) Remove and discard the cotter pin (16).
(b) Remove the nut (17), the washer (18) and the bolt (20).
(c) Move the rocker assembly (15) from between the sides of the
regulator (8).
(d) Remove and discard the cotter pins (28).
(e) Remove the nuts (27) and the washers (26).
(f) Remove the screw (24), the bolt (25), the spacers (23) and the
rocker assembly (15).
NOTE : Do not disassemble other items of the rocker assembly (15)
____
or remove the pulleys (21) unless a repair or a new
installation is necessary.
(5) Remove the regulator (8) as follows:
NOTE : Do not remove the nuts (7) and the bushes (19) from the
____
regulator (8) unless a repair or a new installation is
necessary.
(a) Remove the nuts (14), the washers (13) and the bolts (11).
(b) Remove the regulator (8) and the shims (12) from the structure.
NOTE : Identify the shims (12) for installation in the same
____
positions.



EFF :
ALL
 27-41-42



AIJ




Page 406
Feb 01/07

TASK 27-41-42-400-001
Installation of the Cable Tension Regulator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
0U190360
98D27403500000
98D27407532000

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 PITCH TRIM CONTROL LOCKING
1 RIGGING PIN - THS MECHANICAL CONTROL



EFF :
ALL
 27-41-42



AIJ




Page 407
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 05-005
Material No. 08-029
R
Material No. 09-013
Material No. 16-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA ASTM D 5363
GROUP 4 CLASS 2 GRADE 1
RETAINING ADHESIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
F
ASNB70720
COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------16
28

cotter pin
cotter pins

27-41-42 01 -220
27-41-42 01 -130

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-24-11-100-001
20-24-12-200-001
27-41-00-220-002
29-10-00-864-001
29-10-00-864-002
53-32-12-000-002
53-32-12-400-002
27-41-42-991-002
27-41-42-991-001

Cleaning and Protection of the Cables


Check of the Control Cables
Check of the Correct Tension of the THS Mechanical
Control Cables
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 401
Fig. 402



EFF :
ALL
 27-41-42



AIJ




Page 408
Nov 01/10

3. __________
Job Set-up
Subtask 27-41-42-860-052
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access panel 311AL is removed and the access door
312AR is opened.
(3) Make sure that the floor panels 241FF, 241BF (Ref. TASK 53-32-12-000002) are removed.
(4) Make sure that the locking clips (30) are removed and the turnbuckles
(31) are released.
(Ref. Fig. 401/TASK 27-41-42-991-002)
NOTE : Make sure that there is no tension on the THS control cables.
____
(5) Make sure that the Green and the Yellow hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002).
(6) Make sure that the warning notices are in position to tell persons
not to pressurize the Green and the Yellow hydraulic systems.
(7) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed in the pitch trim control wheel.
(8) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) is installed in the mechanical input of the THS actuator.
Subtask 27-41-42-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-41-42



AIJ




Page 409
Feb 01/11

Subtask 27-41-42-910-050
C. Preparation for the Installation
(1) Examine the cover assembly (1) for damage.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the bolts (3),(5),(11), the shims (12) and the nuts
(14) are clean and not damaged.
(4) Examine the regulator (8) and make sure that:
- the nuts (7) are not damaged,
- the springs (10) are not damaged,
- the bushes (19) are tight in the regulator (8),
- the pulleys (21) are not damaged,
- the pulleys (21) are free to turn in the rocker assembly (15),
- the regulator (8) is fully serviceable.
(5) Make sure that the cables (22) are not damaged (Ref. TASK 20-24-12200-001).
(6) Make sure that there is no corrosion on the cables (22) (Ref. TASK
20-24-11-100-001).
(7) If replaced, prepare the bushes (19) as follows:
(a) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029) to the
bushes (19) and safety them in the regulator (8).
(b) Seal the bushes (19) with SEALANTS (Material No. 09-013) and
protect them with STRUCTURE PAINTS (Material No. 16-003).
(8) Apply COMMON GREASE (Material No. 04-004) to the threads of the bolts
(3),(5),(11).
(9) Apply SPECIAL MATERIALS (Material No. 05-005) to the shafts of the
bolts (3),(5),(11).



EFF :
ALL
 27-41-42


R 
AIJ




Page 410
Feb 01/07

4. Procedure
_________
(Ref. Fig. 402/TASK 27-41-42-991-001)
Subtask 27-41-42-420-050
A. Installation of the Cable Tension Regulator
(1) Install the regulator (8) as follows:
(a) Put the regulator (8) together with the shims (12) in position at
the structure interface.
(b) Make sure that the shims (12) are installed in the positions
identified during the removal.
(c) Make sure that the cables (22) are correctly installed in the
pulley (21).
(d) Install the bolts (11), the washers (13) and the nuts (14) to
attach the regulator (8) to the structure.
(2) Install the rocker assembly (15) in the regulator (8).
(a) Put the rocker assembly (15) in position on the cables (22) near
the regulator (8).
(b) Make sure that the cables (22) are correctly installed in the
grooves of the pulleys (21).
(c) Put the spacers (23) in position and install the screw (25) and
the bolt (24).
(d) Install the washers (26) and the nuts (27).
(e) TORQUE the nuts (27) to 0.1 m.daN (8.84 lbf.in) and safety them
with the new cotter pins (28).
(f) Put the bolt (20) through the regulator (8), the bushes (19) and
the rocker assembly (15).
(g) Install the washer (18) and the nut (17) on the bolt (20).
(h) TORQUE the nut (17) to 0.8 m.daN (70.79 lbf.in) and safety it
with the new cotter pin (16).
(3) Connect the springs (10) to the bolts (9).



EFF :
ALL
 27-41-42


R 
AIJ




Page 411
Nov 01/08

(4) Adjust the turnbuckles (31) until you can easily install the RIGGING
PIN - THS MECHANICAL CONTROL (98D27407532000) through the rocker
assembly (15) of the regulator.
(Ref. Fig. 401/TASK 27-41-42-991-002)
(5) Install the cover (2) on the regulator (8).
(a) Put the cover (2) in position on the regulator (8).
(b) Install the bolts (5) and the washers (6) on the connection of
the cover (2) and the cover assembly (1).
(c) Install the bolts (3) and the washers (4) on the connection of
the cover (2) and the regulator (8).
Subtask 27-41-42-080-050
B. Removal of the Rigging Pins
R

(1) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


from the mechanical input of the THS actuator.
(2) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) from
the regulator.
(3) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the pitch
trim control wheel.
Subtask 27-41-42-865-051
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
Subtask 27-41-42-220-051
D. Check Procedure
(1) Do a check of the cable tensions (Ref. TASK 27-41-00-220-002).
(2) Make sure that the locking clips (30) are correctly installed in the
turnbuckles (31).
(Ref. Fig. 401/TASK 27-41-42-991-002)



EFF :
ALL
 27-41-42



AIJ




Page 412
May 01/09

5. Close-up
________
Subtask 27-41-42-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel 311AL and close the access door 312AR.
(3) Remove the access platform(s).
(4) Install the floor panels 241FF, 241BF (Ref. TASK 53-32-12-400-002).
(5) Remove the warning notice(s).



EFF :
ALL
 27-41-42


R 
AIJ




Page 413
Feb 01/07

TASK 27-41-42-000-002
Removal of the Springs of the Cable Tension Regulator
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27403500000
98D27407532000

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PITCH TRIM CONTROL LOCKING
1 RIGGING PIN - THS MECHANICAL CONTROL

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
27-41-42-991-003

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Fig. 403



EFF :
ALL
 27-41-42



AIJ




Page 414
Feb 01/11

3. __________
Job Set-up
Subtask 27-41-42-860-053
A. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Remove the access panel 311AL and open the access door 312AR.
(3) Make sure that the pitch-trim control wheel in the cockpit is in the
zero position.
(4) Lock the pitch trim control wheel with the PITCH TRIM CONTROL LOCKING
(98D27403500000).
(5) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
(6) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(7) Put the warning notices in position to tell persons not to pressurize
the Green and the Yellow hydraulic systems.
Subtask 27-41-42-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-41-42



AIJ




Page 415
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-41-42-991-003)


Subtask 27-41-42-020-051
A. Removal of the Springs of the Cable Tension Regulator
(1) Remove the bolts (3). (5), (6) and the washers (4).
(2) Remove the cover (2) from the cable tension regulator (10).
(3) Put the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) in the
rocker assembly (12) of the cable tension regulator (10).
(4) Remove the cotter pins (7) and the washers (8).
(5) Carefully remove the springs (9) from the bolts (11).



EFF :
ALL
 27-41-42



AIJ




Page 416
Feb 01/07

R
R

Springs of the Cable Tension Regulator


Figure 403/TASK 27-41-42-991-003



EFF :
ALL
 27-41-42



AIJ




Page 417
Feb 01/07

TASK 27-41-42-400-002
Installation of the Springs of the Cable Tension Regulator
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
98D27403500000
98D27407532000

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PITCH TRIM CONTROL LOCKING
1 RIGGING PIN - THS MECHANICAL CONTROL

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------7

cotter pins

27-41-42 01 -050



EFF :
ALL
 27-41-42



AIJ




Page 418
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-24-11-100-001
20-24-12-200-001
27-41-00-220-002
29-00-00-864-001
27-41-42-991-003

Cleaning and Protection of the Cables


Check of the Control Cables
Check of the Correct Tension of the THS Mechanical
Control Cables
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 403

3. __________
Job Set-up
Subtask 27-41-42-860-054
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access panel 311AL is removed and the access door
312AR is opened.
(3) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the warning notices are in position to tell persons
not to pressurize the Green and the Yellow hydraulic systems.
(5) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed in the pitch trim control wheel.
(6) Make sure that the RIGGING PIN - THS MECHANICAL CONTROL
(98D27407532000) is installed in the rocker assembly (12) of the
cable tension regulator (10).



EFF :
ALL
 27-41-42



AIJ




Page 419
Feb 01/11

Subtask 27-41-42-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-41-42-991-003)


Subtask 27-41-42-420-051
A. Installation of the Springs of the Cable Tension Regulator
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the THS control cables are not damaged (Ref. TASK 2024-12-200-001).
(4) Make sure that there is no corrosion on the THS control cables
(Ref. TASK 20-24-11-100-001).
(5) Connect the springs (9) to the bolts (11).
(6) Install the washers (8) and the cotter pins (7).
(7) Put the cover (2) in position on the cable tension regulator (10).
(8) Install the bolts (5) with the washers (4) at the cover assembly (1).
(9) Install the bolts (3) and (6) with the washers (4).
(10) TORQUE the bolts (3), (5) and (6) to between 0.4 and 0.5 m.daN (35.39
and 44.24 lbf.in).



EFF :
ALL
 27-41-42



AIJ




Page 420
Feb 01/07

5. Close-up
________
Subtask 27-41-42-860-055
A. Put the aircraft back to the serviceable condition.
(1) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) from
the rocker assembly (12) of the cable tension regulator (10).
(2) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the pitch
trim control wheel.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Install the access panel 311AL and close the access door 312AR.
(5) Remove the access platform(s).
(6) Remove the warning notice(s).
Subtask 27-41-42-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
Subtask 27-41-42-220-052
C. Do a check of the cable tensions of the THS mechanical control cables
(Ref. TASK 27-41-00-220-002).



EFF :
ALL
 27-41-42


R 
AIJ




Page 421
Feb 01/07

STOP AND GEARSET UNIT - PITCH TRIM CONTROL - REMOVAL/INSTALLATION


_________________________________________________________________
TASK 27-41-43-000-001
Removal of the Pitch Trim Control Stop and Gearset Unit
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
0U190360
98D27403000000
98D27403500000

1
1
1
1

ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE


PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
HOLDING TOOL-TRIM CTL LOWER SHAFT
PITCH TRIM CONTROL LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------23-13-13-000-001
23-51-12-000-001
27-41-00-820-002
29-24-00-863-001
29-24-00-864-001
34-41-12-000-001
27-41-43-991-002

Removal of the Radio Management Panel (RMP) (1RG1,


1RG2, 1RG3)
Removal of the Audio Control Panel (ACP) (2RN1, 2RN2,
2RN3, 2RN4, 2RN5)
Adjustment of the THS Control-Cables Length
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the Weather Radar Control Unit (3SQ)
Fig. 401



EFF :
ALL
 27-41-43



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-41-43-010-055
A. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone


121.
(2) Open the access door 811.
Subtask 27-41-43-860-050
B. Aircraft Maintenance Configuration
(1) Pressurize the Yellow hydraulic system (Ref. TASK 29-24-00-863-001).
(2) On the center pedestal, make sure that the pitch-trim control wheels
are in the neutral position.
(3) Install the PITCH TRIM CONTROL LOCKING (98D27403500000) on the
pitch-trim control wheels.

(4) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) on


the imput lever of the THS actuator.
(5) Adjust the cable length by rigging one turnbuckle in one direction
and readjusting the other turnbuckle on the opposite direction in
order to maintain the cable tension.
(6) Check the cable tension on the cable tension compensator indicator
(Ref. TASK 27-41-00-820-002).

(7) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


on the THS actuator mechanical imput.
(8) Check the spring back on the nose up and nose down THS control wheel
positions.
(9) Depressurize the Yellow hydraulic system (Ref. TASK 29-24-00-864001).
(10) Install the HOLDING TOOL-TRIM CTL LOWER SHAFT (98D27403000000) on the
drive shaft (23).

(11) Install the standard locking bolt on the chain (1).



EFF :
ALL
 27-41-43



AIJ




Page 402
Feb 01/11

(12) Remove the radio management panel (1RG1) (Ref. TASK 23-13-13-000001), the audio control panel (2RN1) (Ref. TASK 23-51-12-000-001),
the panel 111VU and the weather radar control unit (Ref. TASK 34-4112-000-001).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-41-43-991-002)


Subtask 27-41-43-020-050
A. Removal of the Stop and Gearset Unit
(1) Remove the lateral panel to get access to the chain
(2) Remove and discard the locwire from the nut (27) and the srew (28).
(3) Loosen the nut (27).
(4) Loosen the srew (28) to release the chain tension adjuster (26).
(5) Remove and discard the cotter pins (8), remove the nuts (9) and the
washers (7).
(6) Remove the screws (3) and remove the cover (4).
(7) Remove and discard the cotter pins (17), remove the nuts (18), the
washers (16) and the screws (11).
(8) Remove and discard the cotter pin (13), remove the nut (14), the
washer (15) and the tapered pin (19).
(9) Remove and discard the five nuts (6), remove the four screws (10) and
the screw (21). Release the chain (22) from the gear (2), remove the
stop unit (5) and the yoke (12).



EFF :
ALL
 27-41-43



AIJ




Page 403
Feb 01/07

R
R

Pitch Trim Control Stop and Gearset Unit


Figure 401/TASK 27-41-43-991-002- 12 (SHEET 1)



EFF :
ALL
 27-41-43



AIJ




Page 404
Feb 01/07

R
R

Pitch Trim Control Stop and Gearset Unit


Figure 401/TASK 27-41-43-991-002- 22 (SHEET 2)



EFF :
ALL
 27-41-43



AIJ




Page 405
Feb 01/07

TASK 27-41-43-400-001
Installation of the Pitch Trim Control Stop and Gearset Unit
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
98D27403000000
98D27403002002
98D27403500000

standard locking bolt


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
DYNAMOMETER 10 DAN (22 LBF) - PUSH
HOLDING TOOL-TRIM CTL LOWER SHAFT
CHECKING TOOL-CHAIN TENSION,PITCH TRIM CTL WHEEL
PITCH TRIM CONTROL LOCKING

1
1
1
1
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6
8
13
17

nuts
cotter pins
cotter pin
cotter pins

27-41-01
27-41-01
27-41-01
27-41-01



EFF :
ALL
 27-41-43



AIJ




03
03
03
04

-030
-080
-080
-030

Page 406
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------23-13-13-400-001
23-51-12-400-001
27-41-00-720-001
29-24-00-864-001
31-10-00-700-001
34-41-12-400-001
27-41-43-991-002

Installation of the Radio Management Panel (RMP)


(1RG1, 1RG2, 1RG3)
Installation of the Audio Control Panel (ACP) (2RN1,
2RN2, 2RN3, 2RN4, 2RN5)
Functional Test of the THS-Actuator Overtravel
Related to the Mechanical Indicator
Depressurize the Yellow Hydraulic System
Test Program after Removal/Installation of a VU panel
Installation of the Weather Radar Control Unit (3SQ)
Fig. 401

3. __________
Job Set-up
Subtask 27-41-43-860-051
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position at zone 121.
(2) Make sure that the access door 811 is open.
(3) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed on the pitch-trim control wheels.
(4) Make sure that the Yellow hydraulic system (Ref. TASK 29-24-00-864001) is depressurized.
(5) Make sure that the HOLDING TOOL-TRIM CTL LOWER SHAFT (98D27403000000)
is installed on the drive shaft (23) .
(6) Make sure that the standard locking bolt is installed on the chain
(1).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-41-43-991-002)
Subtask 27-41-43-640-050
A. Apply COMMON GREASE (Material No. 04-004) to the different components.



EFF :
ALL
 27-41-43



AIJ




Page 407
Feb 01/11

Subtask 27-41-43-420-050
B. Installation of the Stop and Gearset Unit
(1) Put the stop unit (5) with the yoke (12) in position on the plate
(20).
(2) Put the stop unit (5) in nose-down stop position.
NOTE : To get the nose-down stop position, the operator must :
____
- be on the gear side of the stop unit (5),
- turn the gear (2) clockwise.
(3) Put the chain (22) in position on the gear (2).
(4) Install the four screws (10) and the screw (21), install and tighten
the five new nuts (6).
(5) Make sure that the chain (22) is correctly set on all the gears.
(6) Install the tapered pin (19), the washer (15) and the nut (14).
(7) Tighten the nut (14) and safety with the new cotter pin (13).
(8) Install the screws (11), the washers (16) and the nuts (18).
(9) Tighten the nuts (18) and safety with the new cotter pins (17).
(10) Put the chain cover (4) in position, install the screws (3), the
washers (7) and the nuts (9).
(11) Tighten the nuts (9) and safety with the new cotter pins (8).
(12) Install item (24) of CHECKING TOOL-CHAIN TENSION,PITCH TRIM CTL WHEEL
(98D27403002002) on the chain (22), and item (25) on the center
pedestal.
NOTE : The axis of item (24) must be in the middle of the chain
____
section (Ref detail C).
(13) Turn the srew (28) to increase the tension of the chain (22).
R

(14) Attach the DYNAMOMETER 10 DAN (22 LBF) - PUSH to item (24).
(15) With the dynamometer, apply a force of 1.1 daN (2.4728 lbf) in the up
direction at 90 degrees to the chain section and make sure that the
end of item (24) is in the range of item (25) (Ref. detail D).



EFF :
ALL
 27-41-43



AIJ




Page 408
Aug 01/11

(16) Turn the screw (28) to adjust the chain tension if necessary.
R

(17) Remove the DYNAMOMETER 10 DAN (22 LBF) - PUSH and items (24) and (25)
of the CHECKING TOOL-CHAIN TENSION,PITCH TRIM CTL WHEEL
(98D27403002002).
(18) Tighten the nut (27). Make sure that the screw (28) does not turn.
(19) Safety the nut (27) and the screw (28) with lockwire corrosion
resistant steel dia 0.8 mm (0.03 in.).
(20) Make sure that the work area is clean and clear of tool(s) and other
items.
(21) Install the lateral panel.
(22) Install the radio management panel (1RG1) (Ref. TASK 23-13-13-400001), the audio control panel (2RN1) (Ref. TASK 23-51-12-400-001),
the panel 111VU (Ref. TASK 31-10-00-700-001) and the weather radar
control unit (3SQ) (Ref. TASK 34-41-12-400-001).
Subtask 27-41-43-720-050
C. Test
(1) Remove the HOLDING TOOL-TRIM CTL LOWER SHAFT (98D27403000000) from
the drive shaft (23).
(2) Remove the standard locking bolt from the chain (1).
(Ref. Fig. 401/TASK 27-41-43-991-002)
(3) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the
pitch-trim control wheels.
(4) Do the functional test of the THS-actuator overfull travel with
reference to the mechanical indicator (Ref. TASK 27-41-00-720-001).
5. Close-up
________
Subtask 27-41-43-942-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 811.



EFF :
ALL
 27-41-43



AIJ




Page 409
Aug 01/11

(3) Remove the access platform(s).



EFF :
ALL
 27-41-43


R 
AIJ




Page 410
Nov 01/07

CABLES - THS CONTROL - REMOVAL/INSTALLATION


___________________________________________
TASK 27-41-44-000-001
Removal of the THS Control Cables
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific
0U190360
98D27403500000

1
1
1
1

warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING



EFF :
ALL
 27-41-44



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------25-54-12-000-002
25-55-11-000-002
R

25-55-12-000-002
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
53-12-11-000-001
53-12-12-000-001
53-22-12-000-001
53-32-12-000-002
27-41-44-991-001
27-41-44-991-002
27-41-44-991-008
27-41-44-991-003
27-41-44-991-004
27-41-44-991-005
27-41-44-991-006
27-41-44-991-007

Removal of the Ceiling Panels in the FWD Cargo


Compartment
Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
Removal of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Removal of the Cockpit Floor Panels from FR1 Thru
FR12
Removal of the Cabin Floor Panels from FR12 thru FR24
Removal of the Cabin Floor Panels
Removal of the Cabin Floor Panels
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407
Fig. 408

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-41-44-991-001)
Subtask 27-41-44-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


zone 121.

(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


zone 132.



EFF :
ALL
 27-41-44



AIJ




Page 402
Feb 01/11

R
R

Location of Access
Figure 401/TASK 27-41-44-991-001



EFF :
ALL
 27-41-44



AIJ




Page 403
Feb 01/07

(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


zone 154.

(4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
zone 312.
(5) Open the access doors 811, 825, 826, 312AR.
(6) In the zones 211 and 221, remove the floor panels 211GF, 211KF,
221EF, 231CF 221LF (Ref. TASK 53-12-11-000-001) (Ref. TASK 53-12-12000-001).
(7) In the zone 241, remove the floor panels 231WF, 241BF, 241FF, 241KF
(Ref. TASK 53-22-12-000-001) (Ref. TASK 53-32-12-000-002).
(8) In the zone 131, remove the ceiling panels 131AC, 131BC, 131CC, 131PW
(Ref. TASK 25-54-12-000-002).
(9) In the zones 151 and 161, remove the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-000-002) (Ref. TASK
25-55-12-000-002).
Subtask 27-41-44-860-050
B. Aircraft Maintenance Configuration
(1) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) (Ref. TASK 29-24-00-863-001).
(2) On the center pedestal, make sure that the pitch-trim control wheels
are in the 0 position.
(3) Put the PITCH TRIM CONTROL LOCKING (98D27403500000) in position to
prevent the movement of the pitch-trim control wheels.

(4) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


(66) on the input lever of the THS actuator (65) (See Details Q and
R).
(Ref. Fig. 402/TASK 27-41-44-991-002, 403/TASK 27-41-44-991-008)
(5) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) (Ref. TASK 29-24-00-864-001).
(6) Put the warning notices on the CAPT and F/0 side-sticks.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-41-44-991-002, 404/TASK 27-41-44-991-003, 405/TASK
27-41-44-991-004, 406/TASK 27-41-44-991-005, 407/TASK 27-41-44-991-006,
408/TASK 27-41-44-991-007)



EFF :
ALL
 27-41-44



AIJ




Page 404
Feb 01/11

R
R

Cable Linkage
Figure 402/TASK 27-41-44-991-002



EFF :
ALL
 27-41-44



AIJ




Page 405
Feb 01/07

R
R

THS Actuator
Figure 403/TASK 27-41-44-991-008



EFF :
ALL
 27-41-44



AIJ




Page 406
Feb 01/07

R
R

Pitch Trim Control Unit


Figure 404/TASK 27-41-44-991-003



EFF :
ALL
 27-41-44



AIJ




Page 407
Feb 01/07

R
R

Frame Feed-throughs
Figure 405/TASK 27-41-44-991-004



EFF :
ALL
 27-41-44



AIJ




Page 408
Feb 01/07

R
R

Chain Guard
Figure 406/TASK 27-41-44-991-005



EFF :
ALL
 27-41-44



AIJ




Page 409
Feb 01/07

R
R

Cable Tension Regulator


Figure 407/TASK 27-41-44-991-006



EFF :
ALL
 27-41-44



AIJ




Page 410
Feb 01/07

R
R

Cable Tension Regulator


Figure 408/TASK 27-41-44-991-007



EFF :
ALL
 27-41-44



AIJ




Page 411
Feb 01/07

Subtask 27-41-44-010-051
A. Removal of the THS Control Cables
(1) At FR35, 33, 28, 23, 14, remove the cable guides (See Detail F) as
follows :
(a) Cut and discard the cables ties (21).
(b) Remove the retainers (20).
(c) Remove the half-shells (19).
(2) At zone 121, cut and remove the lockwire from the screws (4) and
discard it (See Detail A).
(3) Remove the screws (4) and the washers (3).
(4) Remove the chain guard (2).
(5) At FR42, 48, 53, 58, 63, 67, remove the cable guides (See Detail F)
as follows:
(a) Cut and discard the cable ties (21).
(b) Remove the retainers (20).
(c) Remove the half-shells (19).
(6) At FR70, remove the circlip (15) and disengage the sleeve (16) from
the cable guide (See Detail D and Section EE).
(7) Cut and remove the lockwire from the screws (17).
(8) Remove the screws (17) and the washers (18). Disengage the flange
(13). Remove the half-shells (14).
(9) At zone 310, remove the 4 screws (31) and the washers (32) (See
Detail H).
(10) Release the quick-attach fasteners (28). Remove the chain guards (29)
and (30).
(11) Remove the screws (27) and the chain guide (26).
(12) Remove the 6 screws (33), the washers (32) and the guard (34) (See
Details H and J).



EFF :
ALL
 27-41-44


R 
AIJ




Page 412
Feb 01/07

(13) At zone 241:


(a) Remove the locking clips (22) from the turnbuckles (23),
(b) Turn the turnbuckles (23) until the cables (5), (6), (10), (11)
are disconnected.
(14) Disengage the chain (7) from the gear wheel of the lower shaft
assembly (1).
(15) Pull and remove the chain (7) and cables (5) (6) assembly.
NOTE : Be careful with the ends of the cables (5) and (6) when they
____
move between the frames.
(16) Disengage the upper end of the springs (41) from the 2 flanges (51)
of the tension regulator (40) (See Details J and L).
(17) Remove the cotter pin (43) and discard it. Remove the nut (44) and
the washer (45) (See Detail J and Section KK).
(18) Remove the bolt (47) and the spacer (46).
(19) Lift the 2 flanges (51) and hold them in this position (See Detail
L).
(20) Remove the cotter pin (54) and discard it. Remove the nut (55) and
the washer (53) (See Detail L and Section MM).
(21) Remove the bolt (50) and the spacer (52).
(22) Remove the cotter pin (56) and discard it. Remove the nut (57) and
the washer (58) (See Detail L and Section PP).
(23) Remove the bolt (60) and the spacer (59).
(24) Disengage the chain (35) from the gear wheel of the input shaft (25)
of the THS actuator (65) (See Details H and G).
(25) Pull the cables (10) and (11) up to FR70.
NOTE : Be careful with the ends of the cables (10) and (11) when they
____
move between the frames.
(26) At FR70, remove the sleeve (16) and the flanges (12) and (13) (See
Detail D and Section EE).



EFF :
ALL
 27-41-44



AIJ




Page 413
Feb 01/07

(27) Pull and remove the chain (35) and cables (10) (11) assembly from the
THS actuator (65) (See Detail Q).



EFF :
ALL
 27-41-44



AIJ




Page 414
Feb 01/07

TASK 27-41-44-400-001
Installation of the THS Control Cables
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No specific
No specific
No specific
No specific
0U190360
98D27403500000
98F27003500000

1
1
1
1
1

tensiometer
warning notices
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING
LOCKING,TOOL-CABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-004

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)



EFF :
ALL
 27-41-44



AIJ




Page 415
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------21
43
54
56

cable ties
cotter pin
cotter pin
cotter pin

27-41-03
27-41-42
27-41-42
27-41-42

05
01
01
01

-020
-260
-130
-130

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------25-54-12-400-002
25-55-11-400-002
R

25-55-12-400-002
27-41-00-720-001
27-41-00-820-002
27-41-00-820-004
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
53-12-11-400-001
53-12-12-400-001
53-22-12-400-001
53-32-12-400-002
27-41-44-991-002
27-41-44-991-008
27-41-44-991-003
27-41-44-991-004
27-41-44-991-005
27-41-44-991-006

Installation of the Ceiling Panels in the FWD Cargo


Compartment
Installation of the Ceiling Panels in the AFT Cargo
Compartment -FR47/FR59
Installation of the Ceiling Panels in the Aft Cargo
Compartment - FR59/FR65
Functional Test of the THS-Actuator Overtravel
Related to the Mechanical Indicator
Adjustment of the THS Control-Cables Length
Cutting of the Rear Control Cable of the THS
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Installation of the Cockpit Floor Panels from FR1
thru FR12
Installation of the Cabin Floor Panels from FR12 thru
FR24
Installation of the Cabin Floor Panels
Installation of the Cabin Floor Panels
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407



EFF :
ALL
 27-41-44



AIJ




Page 416
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-44-991-007

Fig. 408

3. __________
Job Set-up
Subtask 27-41-44-010-055
A. Get Access
R

(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position at the zone 121.

(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position at the zone 132.

(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in


position at the zone 154.

(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the zone 312.
(5) Make sure that the access doors 811, 825, 826, 312AR are open.
(6) In the zones 211 and 221, make sure that the floor panels 211GF,
211KF, 221EF, 231CF 221LF are removed.
(7) In the zone 241, make sure that the floor panels 231WF, 241BF, 241FF,
241KF are removed.
(8) In the zone 131, make sure that the ceiling panels 131AC, 131BC,
131CC 131PW are removed.
(9) In the zones 151 and 161, make sure that the ceiling panels 151AC,
151BC, 151CC, 151DC, 161AC, 161BC are removed.



EFF :
ALL
 27-41-44



AIJ




Page 417
Feb 01/11

Subtask 27-41-44-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed to prevent the movement of the pitch-trim control wheels.
R
R

(2) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) (66) is installed on the input lever of the THS actuator
(65) (See Details Q and R).
(Ref. Fig. 402/TASK 27-41-44-991-002, 403/TASK 27-41-44-991-008)
(3) Make sure that the Green and Yellow hydraulic systems (Ref. TASK 2923-00-864-001) (Ref. TASK 29-24-00-864-001) are depressurized.
(4) On the CAPT and F/0 side-sticks, make sure that the warning notices
are in position.
(5) Apply COMMON GREASE (Material No. 04-004) to all the attachment
parts.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-41-44-991-002, 403/TASK 27-41-44-991-008, 404/TASK
27-41-44-991-003, 405/TASK 27-41-44-991-004, 406/TASK 27-41-44-991-005,
407/TASK 27-41-44-991-006, 408/TASK 27-41-44-991-007)
Subtask 27-41-44-420-050
A. Installation of the THS Control Cables
(1) Install the chain (7) on the gear wheel of the lower shaft assembly
(1). Keep to the 33.5 links dimension (See Detail B).
(2) Do the routing of the cables (5) and (6) through FR14, 23, 28, 33,
35.
NOTE : The upper cable (5) goes along the left (when you look from
____
the rear to the front of the aircraft). The lower cable (6)
goes along the right.
(3) At FR14, 23, 28, 33, 35, install the cable guides (See Detail F) as
follows:
(a) Install the half-shells (19).
(b) Install the retainers (20).



EFF :
ALL
 27-41-44



AIJ




Page 418
Feb 01/11

(4) Install the chain (35) on the gear wheel of the input shaft (25) of
the THS actuator (65). Keep to the 33.6 links dimension (See Detail
G).
(5) Do the routing of the cables (10) and (11) to the tension regulator
(40).
NOTE : The cable (10) goes along the right (when you look from the
____
rear to the front of the aircraft). The cable (11) goes along
the left.
(6) Insert the cable (11) inside the rudder-control tension-regulator.
(The cable (10) goes along the right).
(7) Do the routing of the cables (10) and (11) to FR70.
(8) Put the flanges (12) and (13) and the sleeve (16) in position on the
cables (10) and (11) (See Detail D and Section EE).
(9) Do the routing of the cables (10) and (11) to FR67, 63, 58, 53, 48
and 42.
(10) If you install a new rear THS control cable, do the procedure of
cutting of the rear control cable of the THS (Ref. TASK 27-41-00-820004).
R
R

(11) Install the LOCKING,TOOL-CABLE (98F27003500000) to connect the cable


(10) to the cable (6) with the cable turnbuckle (23) (See Detail C).
Do not put tension. Remove the LOCKING,TOOL-CABLE (98F27003500000)

(12) Install the LOCKING,TOOL-CABLE (98F27003500000)

R
R

(13) Connect the cable (11) to the cable (5) with the cable turnbuckle
(23) (See Detail C). Do not put tension. Remove the LOCKING,TOOLCABLE (98F27003500000)
(14) At FR42, 48, 53, 58, 63 and 67, install the cable guides (See Detail
F) as follows:
(a) Install the half-shells (19).
(b) Install the retainers (20).
(c) Install new cable ties (21).
(15) Install the half-shells (14) on the cables (10) and (11) and between
the edges of the flanges (12) and (13) (See Detail D and Section EE).



EFF :
ALL
 27-41-44



AIJ




Page 419
Feb 01/11

(16) Install the flanges (12) and (13) on FR70 with the washers (18) and
the screws (17). Do not tighten.
(17) Install the sleeve (16) and the circlip (15).
(18) Lift the 2 flanges (51) and hold them in this position with the
cables (10) and (11) in their grooves (See Detail L).
(19) Install the spacer (52), the bolt (50), the washer (53), the nut
(55); tighten the nut and secure with the new cotter pin (54) (See
Detail L and Section MM).
(20) Install the spacer (59), the bolt (60), the washer (58), the nut
(57); tighten the nut and secure with the new cotter pin (56) (See
Detail L and Section PP).
(21) Attach the springs (41) to the flanges (51) of the tension regulator
(40).
(22) Install the spacer (46), the bolt (47), the washer (45), the nut
(44); tighten the nut and secure with the new cotter pin (43) (See
Detail J and Section KK).
(23) Install the guard (34), the 6 washers (32) and the 6 screws (33) (See
Details H and J).
(24) Install the chain guide (26) and the screws (27).
Subtask 27-41-44-820-050
B. Adjustment
(1) If you install a new cable, you must put a pre-tension to the cable
before you adjust it.
(a) Put the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000)
(42) in position on the tension regulator (40) (See Detail J).
- In theory, the pre-tension time is 48 hours without movement of
the aircraft. After this pre-tension time the adjustment of the
cable will stay correct.
- A minimum pre-tension time of 4 hours without movement of the
aircraft is permitted. The adjustment of the cable will not
stay correct for a long time. You must do the full pre-tension
procedure when the aircraft stops for maintenance for a
sufficiently long time.
- For a pre-tension time between 4 and 48 hours, the stability of
the adjustments is in proportion to the pre-tension time.



EFF :
ALL
 27-41-44


R 
AIJ




Page 420
Feb 01/11

(b) Use the cable turnbuckles (23) to put a tension of 55 +5 -5 daN


(123.6448 +11.2404 -11.2404 lbf) to the cable linkage (See Detail
C). Measure this value with a tensiometer.
(c) The Linkage must stay in this position for 48 hours.
(d) With the turnbuckles (23), release the tension on the linkage
until you can remove the pin (42).
(e) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000)
(42) from the tension regulator (40).
(2) Make sure that the flanges (12) and (13) are in the correct position
over the cables (10) and (11). Tighten the screws (17) (See Detail D
and Section EE).
(3) Safety the screws (17) with Lockwire corrosion resistant steel dia
0.8 mm (0.03 in.).
(4) Turn the turnbuckles until you cannot see the threads of the aft and
rear wire rope terminal control cables of the THS.
(5) Safety the turnbuckles with the locking clips.
(6) Adjust the control cables length (Ref. TASK 27-41-00-820-002).
NOTE : If you cannot adjust the control cables, do a visual
____
inspection on the pulleys and the tension regulator. If they
are in good condition, replace the control cables.
(7) Make sure that the distance between the turnbuckles and the fairleads
is minimum 25.4 mm (1.0000 in.) over the full travel range of the THS
control.
(8) Make sure that the distance between the ends of the turnbuckles in
each THS control cable is minimun 90 mm (3.5433 in.) in all the
positions.
Subtask 27-41-44-720-050
C. Test
(1) Install the chain guard (2), the washers (3) and the screws (4) (See
Detail A).
(2) Safety the screws (4) with Lockwire corrosion resistant steel dia 0.8
mm (0.03 in.).



EFF :
ALL
 27-41-44


R 
AIJ




Page 421
Feb 01/11

(3) Install the chain guard (29). Attach it with the 4 washers (32) and
the 4 screws (31) (See Detail H).
(4) Install the chain guard (30) and lock with the quick-attach fasteners
(28).
(5) Install the locking clips (21) in the turnbuckles (22) (See Detail
C).
(6) Make sure that the tool from the PITCH TRIM CONTROL LOCKING
(98D27403500000) and the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT
LEVER (0U190360) (66) from the THS actuator (65) are removed.

R
R

(7) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-863-001) (Ref. TASK 29-24-00-863-001).
(8) Do the functional test of the THS mechanical control (Ref. TASK 2741-00-720-001).
5. Close-up
________
Subtask 27-41-44-860-051
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001) (Ref. TASK 29-24-00-864-001).
(2) Remove the warning notice(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-41-44-410-056
B. Close Access
(1) In the zones 211 and 221, install the floor panels 211GF, 211KF,
221EF, 231CF 221LF (Ref. TASK 53-12-11-400-001) (Ref. TASK 53-12-12400-001).
(2) In the zone 241, install the floor panels 231WF, 241BF, 241FF, 241KF
(Ref. TASK 53-22-12-400-001) (Ref. TASK 53-32-12-400-002).
(3) In the zone 131, install the ceiling panels 131AC, 131BC, 131CC,
131PW (Ref. TASK 25-54-12-400-002).



EFF :
ALL
 27-41-44



AIJ




Page 422
Feb 01/11

(4) In the zones 151 and 161, install the ceiling panels 151AC, 151BC,
151CC, 151DC, 161AC, 161BC (Ref. TASK 25-55-11-400-002) (Ref. TASK
25-55-12-400-002).
(5) Close the access doors 811, 825, 826, 312AR.
(6) Remove the access platform(s).



EFF :
ALL
 27-41-44



AIJ




Page 423
Feb 01/11

DRIVE SHAFT - MECHANICAL INPUT - REMOVAL/INSTALLATION


_____________________________________________________
TASK 27-41-45-000-001
Removal of the Mechanical Input Drive Shaft Assy
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
0U190360
98D27403500000
98D27407532000

1
1
1
1

circuit breaker(s) safety clip(s)


cord
warning notices
wax paper
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING
RIGGING PIN - THS MECHANICAL CONTROL



EFF :
ALL
 27-41-45



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-001
29-00-00-864-001
53-32-12-000-002
27-41-45-991-001
27-41-45-991-002
27-41-45-991-003

Installation of the Pitch-Trim Control Locking Tool


(98D27403500000)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Cabin Floor Panels
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-41-45-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Remove the access panel 311AL and open the access door 312AR.
Subtask 27-41-45-860-050
B. Aircraft Maintenance Configuration
(1) Turn the pitch-trim control wheel in the cockpit and put the THS
actuator near to the zero position.
(2) Lock the pitch trim control wheel with the PITCH TRIM CONTROL LOCKING
(98D27403500000) (Ref. TASK 27-00-00-480-001).
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.



EFF :
ALL
 27-41-45



AIJ




Page 402
Feb 01/11

Subtask 27-41-45-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-41-45-480-050
D. Safety Precaution
(Ref. Fig. 401/TASK 27-41-45-991-001)
R

(1) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in


the mechanical input of the THS actuator.
(2) Put the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) in the
rocker assembly of the cable tension regulator.
Subtask 27-41-45-860-051
E. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(2) Put the warning notices in position to tell persons not to pressurize
the Green and the Yellow hydraulic systems.
Subtask 27-41-45-010-051
F. Get Access
(1) Remove the floor panels 241FF, 241BF (Ref. TASK 53-32-12-000-002).
(2) Remove the locking clips and release the turnbuckles of the THS
control cables.
NOTE : Make sure that there is no tension on the THS control cables.
____



EFF :
ALL
 27-41-45



AIJ




Page 403
May 01/09

R
R

Location of Rigging Pins


Figure 401/TASK 27-41-45-991-001



EFF :
ALL
 27-41-45



AIJ




Page 404
Feb 01/07

4. Procedure
_________
Subtask 27-41-45-020-050
A. Removal of the Drive Shaft Assy
(Ref. Fig. 402/TASK 27-41-45-991-002, 403/TASK 27-41-45-991-003)

(1) Remove the screws (15) and the washers (16) from the upper chain
cover (17).
(2) Release the quick-release fasteners (33) on the upper chain cover
(17) and the lower chain cover (41).
(3) Remove the upper chain cover (17).
(4) Remove the lower chain cover (41) and the chain cover base plate
(48).
(5) Disconnect the chain (47) from its sprocket (11):
(a) Remove and discard the cotter pin (14).
(b) Remove the nut (13), the washers (10), (12), and the bolt (9)
from the sprocket (11).
(c) Remove the sprocket (11) from the sprocket shaft (19).
(d) Disconnect the chain (47) from its sprocket (11) and attach the
chain with a cord to the airframe structure.
(6) Remove the drive shaft assy from the airframe structure:
(a) Remove and discard the cotter pins (27).
(b) Remove the nuts (28), the washers (29), and the bolts (32).
(c) Remove and discard the cotter pins (4).
(d) Remove the nuts (3), the washers (2), and the bolts (1) from the
bracket (37).
(e) Remove the bracket (37) and the drive shaft assy from the
airframe structure.



EFF :
ALL
 27-41-45



AIJ




Page 405
Feb 01/07

R
R

THS Drive Shaft Assembly


Figure 402/TASK 27-41-45-991-002



EFF :
ALL
 27-41-45



AIJ




Page 406
Feb 01/07

R
R

Chain Cover Assembly


Figure 403/TASK 27-41-45-991-003



EFF :
ALL
 27-41-45



AIJ




Page 407
Feb 01/07

(7) Disassemble the drive shaft assy:


(a) Disengage the sprocket shaft (19) and the drive shaft assy from
the bracket (37).
(b) Remove and discard the cotter pins (21).
(c) Remove the nuts (22), the washers (23), and the bolts (18).
(d) Remove the bolts (26) and the spacers (20).
(e) Remove the link plate (30) and the swivel plates (24).
(8) Disassemble the bracket assembly:
(a) Remove and discard the cotter pins (34).
(b) Remove the nuts (35), the washers (36), and the bolts (5).
(c) Disconnect the chain guard base plate (6) from the bracket (37).
(d) Remove the screws (8) and disconnect the chain guard (7) from the
chain guard base plate (6).
(e) Cut and remove the lockwire from the screws (40).
(f) Remove the screws (40) and the flange (39).
(g) Remove the needle bearings (38) from the bracket (37).
NOTE : Put the needle bearings in wax paper to prevent corrosion.
____



EFF :
ALL
 27-41-45



AIJ




Page 408
Feb 01/07

TASK 27-41-45-400-001
Installation of the Mechanical Input Drive Shaft Assy
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
0U190360
98D27403500000
98D27407532000

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 PITCH TRIM CONTROL LOCKING
1 RIGGING PIN - THS MECHANICAL CONTROL



EFF :
ALL
 27-41-45



AIJ




Page 409
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-001
Material No. 04-004
Material No. 05-002
Material No. 19-009
R

F
DCSEA 359/A
WHEEL BEARING MINERAL GREASE (Ref. 20-31-00)
USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS S TL OR NICKEL ALLOY
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
14
21
27
34

cotter
cotter
cotter
cotter
cotter

pins
pin
pins
pins
pin

27-41-04
27-41-04
27-41-04
27-41-04
27-41-04

04
04
04
04
04

-260
-300
-150
-340
-300

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-24-11-100-001
20-24-12-200-001
27-00-00-080-001
27-41-00-220-002
27-41-00-720-001
29-00-00-864-001
53-32-12-000-002
53-32-12-400-002

Cleaning and Protection of the Cables


Check of the Control Cables
Removal of the Pitch-Trim Control Locking Tool
(98D27403500000)
Check of the Correct Tension of the THS Mechanical
Control Cables
Functional Test of the THS-Actuator Overtravel
Related to the Mechanical Indicator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Removal of the Cabin Floor Panels
Installation of the Cabin Floor Panels



EFF :
ALL
 27-41-45



AIJ




Page 410
Aug 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-45-991-001
27-41-45-991-002
27-41-45-991-003

Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-41-45-860-052
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access panel 311AL is removed and the access door
312AR is opened.
(3) Make sure that the floor panels 241FF, 241BF (Ref. TASK 53-32-12-000002) are removed.
(4) Make sure that the locking clips are removed and the turnbuckles of
the THS cables are released.
NOTE : Make sure that there is no tension on the THS control cables.
____
(5) Make sure that the Green and the Yellow hydraulic systems are
depressurized and in the maintenance configuration (Ref. TASK 29-0000-864-001).
(6) Make sure that the warning notices are in position to tell persons
not to pressurize the Green and the Yellow hydraulic systems.
(7) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed in the pitch trim control wheel.
(8) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) is installed in the mechanical input of the THS actuator.
(9) Make sure that the RIGGING PIN - THS MECHANICAL CONTROL
(98D27407532000) is installed in the rocker assembly of the
regulator.
(Ref. Fig. 401/TASK 27-41-45-991-001)



EFF :
ALL
 27-41-45



AIJ




Page 411
Feb 01/11

Subtask 27-41-45-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-41-45-910-050
C. Preparation for the Installation
(1) Examine the parts of the drive shaft assembly for damage.
(2) Examine the upper chain cover assembly (6), (7), (17) for damage.
(3) Examine the lower chain cover assembly (41), (48) for damage.
(4) Examine the sprocket (11) for damage.
(5) Examine the needle bearings (38) for damage.
(6) Make sure that the bolts and nuts are clean and not damaged.
(7) Examine the bracket (37) for damage.
(8) Make sure that the THS control cables are not damaged (Ref. TASK 2024-12-200-001).
(9) Make sure that there is no corrosion on the THS control cables
(Ref. TASK 20-24-11-100-001).
(10) Clean the component interface and/or the adjacent area.
(11) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-41-45


R 
AIJ




Page 412
Feb 01/07

4. Procedure
_________
Subtask 27-41-45-420-050
A. Installation of the Drive Shaft Assy
(Ref. Fig. 402/TASK 27-41-45-991-002, 403/TASK 27-41-45-991-003)

(1) Assemble the bracket assembly:


(a) Apply COMMON GREASE (Material No. 04-001) to the needle bearings
(38).
(b) Push the needle bearings (38) into the bracket (37).
(c) Put the flange (39) in position and install and tighten the
screws (40).
(d) Safety the screws (40) with MISCELLANEOUS (Material No. 19-009).
(e) Put the chain guard (7) in position on the chain guard base plate
(6) and install and tighten the screws (8).
(f) Install the chain guard base plate (6) on the bracket (37) with
the bolts (5), the washers (36), and the nuts (35).
(g) TORQUE the nuts (35) to 0.35 m.daN (30.97 lbf.in).
(h) Safety the nut (35) with the new cotter pin (34).
(2) Assemble the drive shaft assy:
(a) Apply SPECIAL MATERIALS (Material No. 05-002) on the bolts (26).
(b) Install the two swivel plates (24) together with the bolts (26),
the spacers (20), the washers (23), and the nuts (22) on the
drive shaft (25).
(c) TORQUE the nuts (22) to 0.8 m.daN (70.79 lbf.in).
(d) Safety the nuts (22) with the new cotter pins (21).
(e) Apply SPECIAL MATERIALS (Material No. 05-002) on the bolts (18).
(f) Install the link plate (30) together with the bolts (18), the
spacers (20), the washers (23), and the nuts (22) on the swivel
plate (24).



EFF :
ALL
 27-41-45



AIJ




Page 413
Feb 01/07

(g) TORQUE the nuts (22) to 0.8 m.daN (70.79 lbf.in)


(h) Safety the nuts (22) with the new cotter pins (21).
(i) Install the sprocket shaft (19) together with the bolts (18), the
spacers (20), the washers (23), and the nuts (22) on the swivel
plate (24).
(j) TORQUE the nuts (22) to 0.8 m.daN (70.79 lbf.in).
(k) Safety the nuts (22) with the new cotter pins (21).
(3) Engage the bracket assembly on the sprocket shaft (19).
(4) Install the drive shaft assembly on the airframe structure:
(a) Put the bracket (37) and the drive shaft assy in position near
the airframe structure.
(b) Install the bracket (37) with the bolts (1), the washers (2), and
the nuts (3) on the airframe structure.
(c) TORQUE the nuts (3) to 0.8 m.daN (70.79 lbf.in).
(d) Safety the nuts (3) with the new cotter pins (4).
(5) Install the link plate on the mechanical input lever of the THS
actuator:
(a) Put the link plate (30) in position on the mechanical input lever
(31).
(b) Install the link plate (30) with the bolts (32), the washers (29)
and the nuts (28) on the mechanical input lever (31).
NOTE : Make sure that you install the bolts (32) in the correct
____
direction
(Ref. Fig. 402/TASK 27-41-45-991-002)

(c) TORQUE the nuts (28) to 0.8 m.daN (70.79 lbf.in).


(d) Safety the nuts (28) with the new cotter pins (27).
(6) Install the chain on the sprocket:
(a) Apply COMMON GREASE (Material No. 04-004) to the sprocket (11)
and the chain (47).



EFF :
ALL
 27-41-45



AIJ




Page 414
Feb 01/07

(b) Align the holes in the sprocket shaft (19) and the sprocket (11).
(c) Engage the chain (47) on the sprocket (11).
NOTE : Make sure that the length of the LH chain is 33.6 links
____
+1.15/-0.26 links (320.7 mm (12.6259 in.) +11.0 mm (0.4330
in.) -2.5 MM (0.0984 IN.)) tangential from the center of
the sprocket.
(d) Push the sprocket (11) with the chain (47) on the sprocket shaft
(19).
(e) Install the sprocket (11) with the bolt (9), the washers (10),
(12) and the nut (13).
(f) Safety the nut (13) with the new cotter pin (14).
(7) Put the chain cover base plate (48) in position and attach the lower
chain cover (41) with the quick-release fasteners to the chain cover
base plate (48).
(8) Install the upper chain cover (17) with the quick-release fasteners
(33).
(9) Install the washers (16) and the screws (15) on the upper chain cover
(17) and tighten the screws.
(10) Adjust the cable tension (Ref. TASK 27-41-00-220-002).
(11) Make sure that the locking clips are correctly installed in the
turnbuckles of the THS control cables.
(12) Do the functional test of the THS mechanical control (Ref. TASK 2741-00-720-001).
Subtask 27-41-45-080-050
B. Removal of the Rigging Pins
(Ref. Fig. 401/TASK 27-41-45-991-001)
R

(1) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


from the mechanical input of the THS actuator.
(2) Remove the RIGGING PIN - THS MECHANICAL CONTROL (98D27407532000) from
the regulator.



EFF :
ALL
 27-41-45



AIJ




Page 415
May 01/09

(3) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the pitch
trim control wheel (Ref. TASK 27-00-00-080-001).
Subtask 27-41-45-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
5. Close-up
________
Subtask 27-41-45-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel 311AL and close the access door 312AR.
(3) Remove the access platform(s).
(4) Install the floor panels 241FF, 241BF (Ref. TASK 53-32-12-400-002).
(5) Remove the warning notice(s).



EFF :
ALL
 27-41-45


R 
AIJ




Page 416
Feb 01/07

THS HYDRAULIC ACTUATION - DESCRIPTION AND OPERATION


___________________________________________________
1. General
_______
The Trimmable Horizontal Stabilizer (THS) actuator moves the control surface
of the THS. The THS actuator is an electro-hydraulic unit that changes the
mechanical or the electrical pitch-trim commands into mechanical movements.
The THS actuator has two hydraulic motors and a Pitch-Trim Actuator (PTA).
The PTA controls the hydraulic actuation. Two hydraulic systems, the Yellow
and the Green hydraulic system supply the hydraulic motors. The Yellow and
Green hydraulic systems have independent fluid supplies.
The access door 312AR gives access to the THS actuator.
2. Component
__________________
Location
(Ref. Fig. 001, 002)
------------------------------------------------------------------------------FIN
I
FUNCTIONAL DESGINATION
I PANELIZONEIACCESS I
ATA
I
I
I
I DOOR I
REF.
------------------------------------------------------------------------------9CE
ACTUATOR-THS
311
27-44-51
MOTOR-THS ACTUATOR, YELLOW
311
312AR
27-44-53
MOTOR-THS ACTUATOR, GREEN
312
312AR
27-44-53
BRAKE - PRESSURE-OFF, THS ACTUATOR,
311
312AR
YELLOW
BRAKE - PRESSURE-OFF, THS ACTUATOR,
312
312AR
GREEN
VALVE BLOCK - THS ACTUATOR, YELLOW
311
312AR
VALVE BLOCK - THS ACTUATOR, GREEN
312
312AR
3. System
__________________
Description
(Ref. Fig. 003)
The THS actuator moves the THS. The THS actuator is an electro-hydraulic
unit. Its component parts are:
- two hydraulic motors,
- one pitch trim actuator,
- one fail-safe ball screwjack,
- one mechanical input shaft,
- two pressure-off brakes,
- two position transducer packs,
- one gear box,
- two hydraulic valve blocks.
The THS of the aircraft is operated by the THS actuator to get the
longitudinal pitch-trim control of the aircraft.



EFF :
ALL
 27-44-00


R 
AIJ




Page 1
Feb 01/07

Component Location
Figure 001


EFF :
ALL
 27-44-00



AIJ




Page 2
Feb 01/07

Component Location
Figure 002


EFF :
ALL
 27-44-00



AIJ




Page 3
Feb 01/07

THS Actuator
Figure 003


EFF :
ALL
 27-44-00



AIJ




Page 4
Feb 01/07

The THS actuator controls the deflection of the THS mechanically by a


servosystem. The servosystem has an input signal which is an electrical
position sequence, transmitted by the Elevator Aileron Computer (ELAC) and
the Spoiler Elevator Computer (SEC). The input signal is transmitted to the
PTA which is part of the THS actuator and moves the gear trains of the
control loop.
A mechanical input link is connected to the gear trains of the control loop
through an override mechanism. This permits the pilot to override the ELAC
and SEC signals with the control wheel in the cockpit.
If there is a loss of the hydraulic power or control signal, the THS
actuator makes sure that the THS is fully immobilized.
The two hydraulic systems supply fluid independently to the hydraulic
motors. Output force from the hydraulic motors is transmitted to the screw
shaft through a power differential gear followed by a reducing gear.
Therefore it is possible to operate on one circuit at half of the maximum
speed.
The double control loop gear sends the input and the reset signals to the
valve blocks.
A comparison system makes sure that the THS actuator is immobilized if one
control valve or one of the control gear loops locks.
In the normal operation mode, the SEC and the ELAC automatically or
electrically signal the pitch trim. The computers transmit the signals to
one of the three electric motors of the PTA. The electric motor moves the
double control gear loop.
The THS actuator has the subsequent items to make maintenance easier.
These items include:
- inspection windows which permit a visual inspection of the power gear
teeth,
- a cranking shaft which is used to manually crank the power differential
output shaft.
This then permits the release of the pressure-off brakes with a special
tool, also to test the pressure-off brakes with both brakes engaged,
- an oil drain port with a magnetic plug,
- the fill and drain adaptors to replace oil,
- an oil breather to keep the interior of the gear box at atmospheric
pressure,
- a grease nipple on the flange of the ball nut permits the lubrication of
the nut,
- a rigging pin located at the mechanical input to put the stabilizer at the
zero degree position,
- a mechanical indicator to show no-back wear,
- two mounting devices are on each side of the gear box; this permits an
easier removal,



EFF :
ALL
 27-44-00


R 
AIJ




Page 5
Feb 01/07

- an oil level sight glass to see the level of the oil in the gear box.
4. ____________
Power Supply
(Ref. 27-90-00)
5. Component
_____________________
Description
(Ref. Fig. 001, 003)
A. Hydraulic Motors
Two hydraulic motors are installed on the THS actuator. Each hydraulic
motor is a fixed displacement type. The hydraulic fluid enters the
pressure port and causes the rotating group to turn. The rotating group
has nine pistons. These pistons move in their bores in the cylinder
barrel when the cylinder turns. Turning of the cylinder barrel gives the
necessary torque. The torque is transmitted through a splined drive shaft
to the gear box of the THS actuator.
Two drain tubes are installed below the flanges of the hydraulic motors.
These drain tubes drain the leakage of the hydraulic motors.
B. Fail-Safe Ball Screw-Jack
(1) Fail Safe System
A fail-safe tie bar goes through the center of the screw shaft and
prevents axial separation of the screw shaft. The fail-safe ball
screw-jack has two load paths. The primary load path transmits the
load and the secondary path stays free of any load. If the primary
load path is axially separated, the secondary path takes the load and
prevents damage to the ball screw-jack. Therefore the two ends
continue to turn if the screw shaft is fractured.
(2) Ball Screw-Jack
The ball screw-jack is made up of the ball screw and the fail-safe
ball nut. The fail-safe ball nut has three transport guides, a
threaded fail-safe unit wiper and ice chipper. The mechanical input
shaft limits the range of travel of the screw-jack.
(3) No-Back System
The THS actuator has a no-back system that has a no-back brake which
is of a ratchet and pawl type. The no-back brake holds the ball screw
in its last position. It prevents movement of the ball screw under
aerodynamic loads. A no-back wear detection device in the form of an
indicator (no-back wear indicator) is installed on the lower side of
the gear box. The indicator has a cam roller which faces the top edge



EFF :
ALL
 27-44-00


R 
AIJ




Page 6
Feb 01/07

of the claw-stop. This finds the gap which agrees with the wear limit
to be detected.
If a high wear does occur, a compressive external load causes the top
claw-stop to move up to a higher position. This causes the top
claw-stop to touch the cam roller of the indicator. This then makes
the red finger of the indicator pop out and give a visual wear
alarm.
C. Control Valve Blocks
The THS actuator has two control valve blocks. The two valve blocks
control the operation of the THS actuator. Each valve block has:
- a high pressure (HP) filter,
- an inlet and outlet port,
- two input control shafts,
- a control valve,
- a shut-off valve,
- a POB control valve,
- a control device for the shut-off valve.
The control valve blocks supply pressure to the hydraulic motors and to
the brake release piston. The control valve blocks can be installed on
the left hand (LH) or on the right hand (RH) side of the THS actuator.
D. Gearbox
The gearbox is in a split housing. The two housing parts are made of a
light metal alloy. The two housing parts are referred to as the upper
casing and the lower casing. The upper casing holds the screw and no-back
housing assembly. It also supports the two hydraulic motors, the
mechanical input lever and the control position transducer.
The lower casing supports:
- the PTA,
- the monitor position transducer,
- the two pressure-off brakes,
- two hydraulic block valves,
- the magnetic drain plug.
In the gearbox is the oil which is necessary to lubricate the internal
components. The level of the oil can be checked visually through an oil
level sight glass. The oil level sight glass is on the upper casing.



EFF :
ALL
 27-44-00


R 
AIJ




Page 7
Feb 01/07

E. Pressure-Off Brakes
Each hydraulic motor shaft has a POB. Each POB is located at the output
shaft of their related hydraulic motor. The POB is a dry brake with a
hydraulic release which is used to lock the shaft of the motor. The shaft
of the motor is locked if a failure occurs in the hydraulic system or in
a hydraulic motor. It thus lets the second motor fully control the ball
screw through the power differential.
F. Pitch Trim Actuator
The pitch trim actuator (PTA) has:
(1) Three brushless motors, each with an electro-magnetic clutch. In the
normal mode, one clutch will be applied (energized) and the others
de-clutched (de-energized). The output of the three motors is
connected to move the input shaft through a reduction gear.
(2) Three electronic sets, one to control each motor. The electronic sets
also control the signal from the ELAC/SEC computers.
(3) An override mechanism with three microswitches. It is installed
downstream of the reduction gearbox. The override mechanism is
connected mechanically to the input shaft.
G. Position Transducer
The THS actuator has two inductive position transducer packages. They are
the command position transducer and the monitor position transducer.
The command position transducer is used to find the position of the
override mechanism output/input control sequence to the control system of
the THS actuator.
The monitor position transducer is used to find the position of the ball
screw.
H. Structural Components
The structural components include:
- The attachments to the horizontal stabilizer,
- The attachments to the THS actuator and to the structure.
- The ball screw and the ball nut.
The THS actuator is connected to the horizontal stabilizer through the
dual concentric axles, the attachment plates and the fail safe plates.
These are installed to the trunnions of the ball nut.



EFF :
ALL
 27-44-00


R 
AIJ




Page 8
Feb 01/07

A primary ring gimbal attaches the THS actuator to the structure. The
primary ring gimbal is installed on the two linking axles of the no-back
housing spigots.
The structural components are of a two-path configuration. On the
secondary load path there is usually no load.
J. Line Replaceable Units (LRU)
The Line Replaceable Units (LRU) connected to the THS actuator are as
follows:
-

electronic control module of each of the electric motors,


pitch trim actuator,
position transducer packs,
filter,
hydraulic motors.

K. Technical Data
(1) Mechanical
--------------------------------------------------------------------- THS actuator travel with a total
THS angular movement
17.5 degrees
- Operation travel
513.75 mm (20.23 in.)
- Stop-to-stop travel
531.75 mm (20.94 in.)
- Used travel of the electrical inputs 2105 rev
- Used travel of the mechanical inputs 6.13 rev
- Limit load
- Tensile
12.700 daN (28.550 lbf.)
- Compressive
19.000 daN (46.086 lbf.)
- Weight (when filled with fluid)
47.9 kg (105.4 lb.)
(2) Hydraulic
--------------------------------------------------------------------- Maximum flow for each circuit
27 l/min (7.02 USgal.mn)
- Maximum internal leakage
1 to 1.5 l/min
(0.264 to 0.396 USgal.mn)
- Maximum external leakage
Nil
- Operation pressure of pressure-off
brake
100 bar (1450 psi)



EFF :
ALL
 27-44-00


R 
AIJ




Page 9
Feb 01/07

6. _________
Operation
(Ref. Fig. 004, 005, 006)
A. Normal Operation
The Green and Yellow hydraulic systems send hydraulic power through the
valve blocks to the POB of the hydraulic motors. When the POB receive the
hydraulic power, they release the shafts of the hydraulic motors. The two
hydraulic motors are ready for operation.
The electrical pitch trim signal of the PTA operates the servomotor No.
1. This servomotor operates both control valves in the open configuration
while the other two servomotors are in stand-by. The servomotor No. 1
operates through a path that has:
- a PTA reduction gear,
- a mechanical override mechanism.
Then two separate gear paths which are connected by an idler are moved.
Each of the separate gear paths have:
- a primary detent,
- an epicyclic control differential,
- a control gear train, which has an eccentric device,
- a control valve detent,
- a control valve command shaft.
The hydraulic fluid is so supplied to both hydraulic motors referred to
the control valve opening.
The epicyclic control differential output moves the control valve.
With the control valves open, the hydraulic fluid flows to the hydraulic
motors.Both hydraulic motors operate at the same time and move the ball
screw through:
- the power differential,
- the power gear train.
As the PTA output continues to rotate, it keeps the control valve open
and so the hydraulic motors operate to move the ball screw.
When the PTA output gets to the position specified by the signal given on
the servomotor, the control differential input is stopped.
The feedback gears moves the control differential output which decreases
the opening of the control valve.
The control valve closes and the hydraulic flow to the motors stop. The
ball screw-jack then stops at the specified position.
Interval stops attached to the mechanical input keep the travel of the
ball screw-jack shaft to a limit. The ball screw has claw-type stops
attached at each end. The stops prevent any mechanical overrun if the
internal stops do not operate.



EFF :
ALL
 27-44-00



AIJ




Page 10
Feb 01/07

THS Actuator Schematic


Figure 004


EFF :
ALL
 27-44-00



AIJ




Page 11
Feb 01/07

Schematic of the Control Valve Block - Normal Operation


Figure 005


EFF :
ALL
 27-44-00



AIJ




Page 12
Feb 01/07

Schematic of the Control Valve Block - Jamming Detection Operation (Blocked


Control Valve)
Figure 006

EFF :
ALL

Page 13


Feb 01/07


AIJ




27-44-00

B. Mechanical Control Operation


The input shaft which is connected to the cable control moves the
mechanical servoloop mechanism through an override mechanism. The
override mechanism installed in the pitch trim actuator makes sure that
the mechanical control cancels the electrical control.
(1) Operation with the PTA in the Off Mode
If a manual command signal is applied with the handwheel to drive the
THS actuator because the PTA is inoperative, the override mechanism
stays off. The input signal is transmitted directly to the control
valves of the valve block.
(2) Operation of the Override Mechanism
If an electrical pitch trim command controls the PTA servomotor, the
manual command signal applied through the mechanical input causes the
override mechanism to break out. This mechanically disconnects the
PTA output from the command loop of the THS actuator. Both control
valves are then driven through the manual command signal of the THS
actuator.
The overriding procedure is possible when the THS actuator is
controlled in a fixed position (the handwheel stands still).
The overriding procedure is also possible when the THS actuator moves
on a demand of a variable electrical command signal (the handwheel
turns).
C. Ground Operation from the Electric Pumps
During operation with low available flow conditions, the pressure
maintaining valve keeps the pressure-off brakes released.
D. Operation in Failure Conditions
(1) Operation with Loss of the Hydraulic Power
The THS actuator is usually supplied with power from two independent
hydraulic systems. When one hydraulic supply to the THS actuator does
not operate, the related POB is activated.
The POB stops and holds the hydraulic motor shaft. If this occurs,
the THS actuator is operated by the other hydraulic system at half
speed, but the necessary maximum performance is still achieved.
If a full loss of hydraulic power occurs, the POB and the no-back
brake operate. They keep the ball screw-jack in the last specified
position against aerodynamic pressure.



EFF :
ALL
 27-44-00


R 
AIJ




Page 14
Feb 01/07

(2) Operation with a Blocked Control Valve


When a control valve is blocked, the jamming protection device
operates to stop hydraulic power. The control valve opening in the
defective circuit lets the hydraulic motor continue to operate. This
causes the ball screw to continue to operate and move the feed-back
gear after the serviceable control valve reaches its neutral
position. This makes the primary detent in the defective control loop
break out. The primary detent tries to operate the serviceable
control valve to open.
As soon as the serviceable control valve is operated, it activates
the comparator (COMP) which is connected to both control valves. The
piston of the COMP operates both shut-off valves. The shut-off valves
isolate the hydraulic power supply from the THS actuator on both
circuits. This makes the motor stop which is usually supplied by the
defective valve. Thus the POB is activated and stops the ball screw.
In the event that a control valve blocks in a position that is not in
the limits of the protection device:
- the two hydraulic motors can operate in the opposite direction at a
low speed,
- the THS actuator does not move,
- the jamming detection is sensitive and makes sure that a permanent
flow rate of fluid is supplied to prevent overheating.
(3) Operation with Disconnected Ball Screw
If the ball screw is disconnected, the no-back brake holds it in its
last signalled position.
7. Test
____
A. Ground Test
Different checks can be done when the Yellow and Green hydraulic systems
are depressurized. The subsequent tests/checks are:
- The operational/test of the valve-jamming protection system.
- The functional test of the pressure off brake.
- The functional test of the no-back brake assembly.
- To check the integrity of the ball screw shaft and the tie bar.
- The visual inspection of the power gears in position with a borescope.
- The visual inspection of the oil level in the gear box through an oil
level sight-glass.



EFF :
ALL
 27-44-00



AIJ




Page 15
Feb 01/07

THS HYDRAULIC ACTUATION - ADJUSTMENT/TEST


_________________________________________
R

TASK 27-44-00-710-001
Operational Test of the Jamming Protection Device of the Trimmable Horizontal
Stabilizer Actuator
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274000-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
0U190857

feeler gage
interphone
permanent ink
access platform 5.5 m (18 ft. 1 in.)
1 TOOL - JAMMING SIMULATION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
No specific

lockwire, corrosion-resistant steel, dia. 0.6 mm


(0.024 in.)
permanent ink



EFF :
ALL
 27-44-00



AIJ




Page 501
Feb 01/07

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-44-00-710-003
27-96-00-710-022
29-23-00-863-001
29-23-00-864-001

R
R
R

31-60-00-860-001
31-60-00-860-002
27-44-00-991-001
27-44-00-991-003
27-44-00-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Trimmable Horizontal
Stabilizer Actuator with both (Green and Yellow) and
Individual Hydraulic Systems
Operational Test of the THS Actuator Electrical
Control (Activation for BITE Test)
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
EIS Start Procedure
EIS Stop Procedure
Fig. 501
Fig. 502
Fig. 503

3. __________
Job Set-up
R

(Ref. Fig. 501/TASK 27-44-00-991-001, 502/TASK 27-44-00-991-003, 503/TASK


27-44-00-991-004)
Subtask 27-44-00-010-050
A. Get Access
(1) Put the access platform in position near to the access door 312AR.
(2) Open the access door 312AR.
(3) On the left and right valve control shaft (7) of the THS actuator:
(a) Cut, remove and discard the lockwire that safeties the cap (6) on
the valve control shaft (7).
(Ref. Fig. 502/TASK 27-44-00-991-003)

(b) Remove the cap (6) from the valve control shaft (7).



EFF :
ALL
 27-44-00



AIJ




Page 502
Feb 01/07

R
R

Operational Test of the Jamming Protection Device


Figure 501/TASK 27-44-00-991-001



EFF :
ALL
 27-44-00



AIJ




Page 503
Feb 01/07

Test Procedure of the Jamming Simulation Tool


Figure 502/TASK 27-44-00-991-003



EFF :
ALL
 27-44-00



AIJ




Page 504
Nov 01/09

R
R

Reference Marks of the Control Valve Detent


Figure 503/TASK 27-44-00-991-004



EFF :
ALL
 27-44-00



AIJ




Page 505
Feb 01/07

(c) Cut, remove and discard the lockwire that safeties the threaded
bush (5).
Subtask 27-44-00-220-050
B. On the left and right threshold box assy do the subsequent steps:
CAUTION : YOU MUST DO ALL THE STEPS OF THIS TEST IN THE SEQUENCE GIVEN TO
_______
PREVENT INCORRECT OPERATION OF THE AIRCRAFT.
(1) Make sure that you cannot put a feeler gage with a thickness of 1.2
mm (0.0472 in.) into the gap
(Ref. Fig. 503/TASK 27-44-00-991-004)
between the input plate and the ball carrier of the control valve
detent.

(2) If the control valve detent is centered, use permanent ink to put two
reference marks in line (if not already marked). Put one of the
reference marks on the input plate, the other on the ball carrier.
NOTE : The control valve detent is centered when the feeler gage does
____
not go in the gap.
(3) If the feeler gage goes in the gap, you must center the control valve
detent again as written below:
Subtask 27-44-00-820-050
C. Recenter the left and the right control valve detents:
CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______
TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT
AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU
CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE
TO THE VALVE CONTROL SHAFT AND THE TOOL.
NOTE : The subsequent steps are not necessary if the control valve detent
____
is centered (see above).
NOTE : The procedures for the left and the right control valve detents
____
are the same. Therefore only one is described.



EFF :
ALL
 27-44-00



AIJ




Page 506
Feb 01/07

(1) Put one of the two sides (LH or RH which is applicable) of the TOOL JAMMING SIMULATION (0U190857) on the splined end of the valve control
shaft.
NOTE : Use the side (N.UP or N.DN) of the TOOL - JAMMING SIMULATION
____
that puts the spigot nearest to the recess.
(2) Turn the mechanical input (1) of the THS actuator until the tool fits
in the recess.
(Ref. Fig. 501/TASK 27-44-00-991-001)

(3) If the side with the LH or RH, A/C N.DN on the tool is installed,
turn the mechanical input clockwise (CW) until the detent is
recentered.
NOTE : When the detent is centered, you can hear a CLICK.
____
(4) If the side with the LH or RH A/C N.UP on the tool is installed, turn
the mechanical input (1) counterclockwise (CCW) until the detent is
recentered.
NOTE : When the detent is centered, you can hear a CLICK.
____
(5) Make sure that you cannot put the feeler gage with a thickness of 1.2
mm (0.0472 in.) into the gap between the input plate and the ball
carrier of the control valve detent.
(6) Use permanent ink to put two reference marks in line (if not already
marked). Put one of the reference marks on the input plate, the other
on the ball carrier.
(Ref. Fig. 503/TASK 27-44-00-991-004)

(7) Remove the TOOL - JAMMING SIMULATION from the splined end of the
control valve input shaft.



EFF :
ALL
 27-44-00



AIJ




Page 507
Feb 01/07

Subtask 27-44-00-865-050
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-44-00-860-050
E. Preparation for the Test
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2923-00-863-001).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(4) On the center pedestal on the ECAM control panel, push the F/CTL
pushbutton switch.
(5) Make sure that, on the lower Display Unit (DU) of the ECAM, the F/CTL
page comes on.
(6) Use the interphone or an equivalent system to communicate between the
cockpit and the fuselage tail section.
4. Procedure
_________
R

(Ref. Fig. 501/TASK 27-44-00-991-001, 502/TASK 27-44-00-991-003, 503/TASK


27-44-00-991-004)
NOTE : Do the test in four steps.
____



EFF :
ALL
 27-44-00



AIJ




Page 508
Feb 01/07

Subtask 27-44-00-710-050
A. Do the test in the electrical mode of the RH valve block.
WARNING : MAKE SURE THAT THE CONTROL VALVE DETENTS ARE CENTERED EACH TIME
_______
YOU COMPLETE ONE OF THE FOUR TEST STEPS. IF THE DETENTS ARE NOT
CENTERED, THE AIRCRAFT WILL NOT OPERATE CORRECTLY.
CAUTION : USE ONLY THE SPECIFIED TOOL. YOU CAN CAUSE DAMAGE TO THE
_______
ACTUATOR IF YOU USE A DIFFERENT TOOL.
CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______
TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT
AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU
CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE
TO THE VALVE CONTROL SHAFT AND THE TOOL.
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the panel 23VU:
- release the FLT CTL/ELAC 1 and
the FLT CTL/SEC 1 pushbutton
switches.
2. On the panel 24VU:
- release the FLT CTL/ELAC 2 and
FLT CTL/SEC 2 pushbutton
switches.

On the panel 23VU:


- the OFF legends of the FLT CTL/ELAC 1
and FLT CTL/SEC 1 pushbutton switches
come on.
On the panel 24VU:
- the OFF legends of the FLT CTL/ELAC 2
and the FLT CTL/SEC 2 pushbutton
switches come on.

3. On the center pedestal:


- make sure that the pitch
trim-control wheel is in the
zero position.
4. Depressurize the Green and Yellow
hydraulic systems.
(Ref. TASK 29-23-00-864-001).
5. On the RH control-valve block (3)
of the THS actuator (4):

On the THS actuator (4):



EFF :
ALL
 27-44-00


R 
AIJ




Page 509
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- install the TOOL - JAMMING
- the control-valve chain is in the
SIMULATION (0U190857) RH A/C
jamming simulation configuration.
N.UP on the shaft (7) of the RH
control-valve block.
(Ref. Fig. 502/TASK 27-44-00991-003)
- push the TOOL - JAMMING
SIMULATION on the splined end
of the shaft (7) of the RH
control-valve.
R
R
R
R
R
R

- turn the mechanical input shaft


(1) counterclockwise (CCW) to
turn the master spline, until
the spigots of the tool engage
with the slots of the valve
block (3).

On the control-valves of the THS


actuator:
- the control-valves are in the open
position.

- fully push the tool to put the


spigots in the slots.
R
(Ref. Fig. 502/TASK 27-44-00991-003)
R
R

6. Pressurize the Green and the


Yellow hydraulic systems
(Ref. TASK 29-23-00-863-001).
CAUTION : STOP THE PITCH TRIM
_______
CONTROL WHEEL WITH YOUR
HANDS IF THE
THS-ACTUATOR DOES NOT
STOP APPROXIMATELY 5
SECONDS AFTER YOU HAVE
PUSHED THE FLT CLT /
ELAC 2 PUSH BUTTON
SWITCH.
THIS OPERATES THE
JAMMING PROTECTION
DEVICE WHICH PREVENTS
DAMAGE TO THE STOP OF
THE MECHANICAL INPUT

On the center pedestal:


- the pitch trim-control wheel moves to
the aircraft nose UP position (the
THS leading edge moves down).



EFF :
ALL
 27-44-00



AIJ




Page 510
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------SHAFT.
R

7. On the center pedestal and on the


panel 24VU:
- look at the pointer of the
pitch trim-control wheel. In
the 5 degree nose UP position
push the FLT CTL/ELAC 2
pushbutton switch.

8. On the panel 24VU:


- release the FLT CTL/ELAC 2
switch.

9. Depressurize the Green and Yellow


hydraulic systems.
(Ref. TASK 29-23-00-864-001).

10. On the rudder pedals:


- operate the rudder pedals in
the left and right directions.

11. On the THS actuator (4):

On the THS actuator (4) and on the


panel 24VU:
- the THS actuator stops (after
approximately 5 seconds),
- on the upper ECAM DU:
- the ELAC 2 PITCH FAULT message
comes on,
- the OFF legend of the FLT CTL/ELAC 2
goes off.
- if the THS actuator does not stop, do
the operational test of the
THS-actuator electrical control
(Ref. TASK 27-96-00-710-022) and do
the necessary corrective action.
On the panel 24VU:
- the OFF legend of the FLT CTL/ELAC 2
switch comes on,
- on the upper ECAM DU:
- the ELAC 2 PITCH FAULT message goes
off.

- after 1 minute all remaining pressure


in the valve blocks of the THS
actuator is released.
On the RH threshold-box assy:
(Ref. Fig. 503/TASK 27-44-00-991-004)



EFF :
ALL
 27-44-00



AIJ




Page 511
Nov 01/09

R
R
R
R
R
R
R

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- If the control valve detent of
- the control-valve detent of the
the JAMMED control valve is
JAMMED control-valve is centered
not recentered, turn the
(which was possibly opened by the
mechanical input in the
ELAC 2 ground setting command) when
counterclockwise (CCW)
you hear a CLICK.
direction to recenter the
control valve detent.
- at the same time the reference marks
on the input plate and the ball
carrier of the control-valve detent
must align.

12. On the RH control-valve block


(3) of the THS actuator (4):
- remove the TOOL - JAMMING
SIMULATION from the splined
end of the control-valve
shaft.
Subtask 27-44-00-710-052
B. Do the test in the electrical mode of the LH valve block.
CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______
TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT
AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU
CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE
TO THE VALVE CONTROL SHAFT AND THE TOOL.
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. Pressurize the Green and the
Yellow hydraulic systems
(Ref. TASK 29-23-00-863-001).
2. Do the operational test of the
jamming protection device again,
in the configuration as follows:
On the center pedestal:
- turn the pitch trim-control
wheel to the zero position.

The THS surface moves to the zero


position.



EFF :
ALL
 27-44-00



AIJ




Page 512
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------3. Depressurize the Green and Yellow
hydraulic systems.
(Ref. TASK 29-23-00-864-001).
4. On the LH control-valve block (2)
of the THS actuator (4):
- install the TOOL - JAMMING
SIMULATION LH A/C N.UP
(0U190857) on the shaft (7) of
the LH control-valve block.
(Ref. Fig. 502/TASK 27-44-00991-003)

On the THS actuator (4):


- the control-valve chain is in the
jamming simulation configuration.

- push the TOOL - JAMMING


SIMULATION on the splined end
of the shaft (7) of the LH
control-valve.
R
R
R
R
R
R

- turn the mechanical input shaft


(1) counterclockwise (CCW) to
turn the master spline, until
the spigots of the tool engage
with the slots of the valve
block (2).

On the control-valves of the THS


actuator:
- the control-valves are in the open
position.

- fully push the tool to insert


the spigots in the slots.
R
(Ref. Fig. 502/TASK 27-44-00991-003)
R
R

5. Pressurize the Green and the


Yellow hydraulic systems
(Ref. TASK 29-23-00-863-001).
CAUTION : STOP THE PITCH TRIM
_______
CONTROL WHEEL WITH YOUR
HANDS IF THE
THS-ACTUATOR DOES NOT
STOP APPROXIMATELY 5
SECONDS AFTER YOU HAVE
PUSHED THE FLT CLT /

On the center pedestal:


- the pitch trim-control wheel moves to
the aircraft nose UP direction (the
THS leading edge moves down).



EFF :
ALL
 27-44-00



AIJ




Page 513
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------ELAC 2 PUSH BUTTON
SWITCH.
THIS OPERATES THE
JAMMING PROTECTION
DEVICE WHICH PREVENTS
DAMAGE TO THE STOP OF
THE MECHANICAL INPUT
SHAFT.
R

6. On the center pedestal and on the


panel 24VU:
- look at the pointer of the
pitch trim-control wheel. In
the 5 degree nose UP position
push the FLT CTL/ELAC 2
pushbutton switch.

7. On the panel 24VU:


- release the FLT CTL/ELAC 2
switch.

8. Depressurize the Green and Yellow


hydraulic systems.
(Ref. TASK 29-23-00-864-001).

9. On the rudder pedals:


- operate the rudder pedals in
the left and right directions
and wait 1 minute.

10. On the THS actuator (4):

On the THS actuator (4) and on the


panel 24VU:
- the THS actuator stops (after
approximately 5 seconds),
- on the upper ECAM DU:
- the ELAC 2 PITCH FAULT message
comes on,
- the OFF legend of the FLT CTL/ELAC 2
goes off.
- if the THS actuator does not stop, do
the operation test of the
THS-actuator electrical control
(Ref. TASK 27-96-00-710-022) and do
the necessary corrective action.
On the panel 24VU:
- the OFF legend of the FLT CTL/ELAC 2
switch comes on,
- on the upper ECAM DU:
- the ELAC 2 PITCH FAULT message goes
off.

- after 1 minute all remaining pressure


in the valve blocks of the THS
actuator is released.
On the LH threshold-box assy:



EFF :
ALL
 27-44-00



AIJ




Page 514
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------(Ref. Fig. 503/TASK 27-44-00-991-004)
R
R
R
R
R
R
R
R

- If the control valve detent of


the JAMMED control valve is
not recentered, turn the
mechanical input in the
counterclockwise (CCW)
direction to recenter the
control valve detent.

- the control-valve detent of the


JAMMED control-valve is centered
(which was possibly opened by the
ELAC 2 ground setting command) when
you hear a CLICK.
- at the same time the reference marks
on the input plate and the ball
carrier of the control-valve detent
must align.

11. On the LH control-valve block


(2) of the THS actuator (4):
- remove the TOOL - JAMMING
SIMULATION from the splined
end of the control-valve
shaft.
Subtask 27-44-00-710-053
C. Do the test in the mechanical mode of the LH valve block.
CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______
TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT
AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU
CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE
TO THE VALVE CONTROL SHAFT AND THE TOOL.
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. Pressurize the Green and Yellow
Hydraulic systems (Ref. TASK 2923-00-863-001).
2. Do the operational test of the
jamming protection device again,
in the mechanical mode as
follows:



EFF :
ALL
 27-44-00



AIJ




Page 515
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------On the center pedestal:
The THS surface moves to the aircraft 5
- Turn the pitch trim-control
degree nose UP position.
wheel to the 5 degree nose UP
position.
3. Depressurize the Green and Yellow
hydraulic systems.
(Ref. TASK 29-23-00-864-001).
4. On the LH control-valve block (2)
of the THS actuator (4):
- install the TOOL - JAMMING
SIMULATION LH A/C N.DN
(0U190857) on the shaft (7) of
the LH control-valve block.
(Ref. Fig. 502/TASK 27-44-00991-003)

On the THS actuator (4):


- the control-valve chain is in the
jamming simulation configuration.

- push the TOOL - JAMMING


SIMULATION on the splined end
of the shaft (7) of the LH
control-valve.
R
R
R
R
R
R

- turn the mechanical input shaft


(1) clockwise (CW) to turn the
master spline, until the
spigots of the tool engage with
the slots of the valve block
(2).

On the control-valves of the THS


actuator:
- the control-valves are in the open
position.

R
- fully push the tool to insert
the spigots in the slots.
R
(Ref. Fig. 502/TASK 27-44-00991-003)
R
R

5. Pressurize the Green and Yellow


hydraulic systems (Ref. TASK 2923-00-863-001).

On the center pedestal:


- the pitch trim-control wheel moves to
the aircraft nose DN direction (the
THS leading edge moves up).



EFF :
ALL
 27-44-00



AIJ




Page 516
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------6. On the center pedestal:
On the THS actuator (4):
- look at the pointer on the
pitch trim-control wheel.
Immediately before the 0 degree
position, turn the wheel in the
nose up direction to give a
slight back order.

7. Depressurize the Green and Yellow


hydraulic systems.
(Ref. TASK 29-23-00-864-001).

8. On the rudder pedals:


- operate the rudder pedals in
the left and right directions
and wait 1 minute.

9. On the THS actuator (4):

- the jamming protection device is


operated and the THS actuator (4)
stops immediately.

- after 1 minute all remaining pressure


in the valve blocks of the THS
actuator is released.
On the LH threshold-box assy:
(Ref. Fig. 503/TASK 27-44-00-991-004)

R
R
R
R
R
R
R
R

- If the control valve detent of


the JAMMED control valve is
not recentered, turn the
mechanical input in the
clockwise (CW) direction to
recenter the control valve
detent.

- the control-valve detent of the


JAMMED control-valve is centered
(which was possibly opened by the
back order on the pitch trim-control
wheel) when you hear a CLICK.
- at the same time the reference marks
on the input plate and the ball
carrier of the control-valve detent
must align.

10. On the LH control-valve block


(2) of the THS actuator(4):
- remove the TOOL - JAMMING
SIMULATION from the splined
end of the control-valve
shaft.



EFF :
ALL
 27-44-00



AIJ




Page 517
Nov 01/09

Subtask 27-44-00-710-054
D. Do the test in the mechanical mode of the RH valve block.
CAUTION : BE CAREFUL WHEN YOU INSTALL OR REMOVE THE JAMMING SIMULATION
_______
TOOL. PUSH OR PULL THE TOOL AND TURN THE MECHANICAL INPUT SHAFT
AT THE SAME TIME. DO THIS UNTIL YOU FIND THE POSITION WHERE YOU
CAN INSTALL OR REMOVE THE TOOL EASILY. THIS WILL PREVENT DAMAGE
TO THE VALVE CONTROL SHAFT AND THE TOOL.
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------R
R

1. Pressurize the Green and Yellow


Hydraulic systems (Ref. TASK 2923-00-863-001).

R
R
R
R

2. Do the operational test of the


jamming protection device again,
in the mechanical mode as
follows:

R
R
R
R
R

On the center pedestal:


- Turn the pitch trim-control
wheel to the 5 degree nose UP
position.

3. Depressurize the Green and Yellow


hydraulic systems.

The THS surface moves to the aircraft 5


degree nose UP position.

R
R

4. On the RH control-valve block (3)


of the THS actuator (4):
- install the TOOL - JAMMING
SIMULATION RH A/C N.DN
(0U190857) on the shaft (7) of
the RH control-valve block.
(Ref. Fig. 502/TASK 27-44-00991-003)

On the THS actuator (4):


- the control-valve chain is in the
jamming simulation configuration.

- push the TOOL - JAMMING


SIMULATION on the splined end
of the shaft (7) of the RH
control-valve.



EFF :
ALL
 27-44-00



AIJ




Page 518
Nov 01/09

R
R
R
R
R
R

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- turn the mechanical input shaft
On the control-valves of the THS
(1) clockwise (cw) to turn the
actuator:
master spline, until the
- the control-valves are in the open
spigots of the tool engage with
position.
the slots of the valve block
(3).

R
- fully push the tool to insert
the spigots in the slots.
R
(Ref. Fig. 502/TASK 27-44-00991-003)
R
R

5. Pressurize the Green and Yellow


hydraulic systems (Ref. TASK 2923-00-863-001).

On the center pedestal:

6. On the center pedestal:

On the THS actuator (4):

- look at the pointer on the


pitch trim-control wheel.
Immediately before the 0 degree
position, turn the wheel in the
nose up direction to give a
slight back order.

- the pitch trim-control wheel moves to


the aircraft nose DN direction (the
THS leading edge moves up).

- the jamming protection device is


operated and the THS actuator (4)
stops immediately.

R
R

7. Depressurize the Green and Yellow


hydraulic systems.
(Ref. TASK 29-23-00-864-001).

8. On the rudder pedals:


- operate the rudder pedals in
the left and right directions
and wait 1 minute.

9. On the THS actuator (4):

- after 1 minute all remaining pressure


in the valve blocks of the THS
actuator is released.
On the RH threshold-box assy
(Ref. Fig. 503/TASK 27-44-00-991-004)



EFF :
ALL
 27-44-00



AIJ




Page 519
Nov 01/09

R
R
R
R
R
R
R

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- If the control valve detent of
- the control-valve detent of the
the JAMMED control valve is
JAMMED control-valve is centered
not recentered, turn the
again (which was possibly opened by
mechanical input in the
the back order on the pitch
clockwise (CW) direction to
trim-control wheel) when you hear a
recenter the control valve
CLICK.
detent.
- at the same time the reference marks
on the input plate and the ball
carrier of the control-valve detent
must align.
10. On the RH control-valve block
(3) of the THS actuator (4):
- remove the TOOL - JAMMING
SIMULATION from the splined
end of the control-valve
shaft.
Subtask 27-44-00-860-052
E. Put the system back to the serviceable condition.
WARNING : MAKE SURE THAT THE CONTROL VALVE DETENTS ARE CENTERED. IF THE
_______
DETENTS ARE NOT CENTERED THE AIRCRAFT WILL NOT OPERATE
CORRECTLY.
(1) On the left and right threshold box assy:
(Ref. Fig. 503/TASK 27-44-00-991-004)
(a) Make sure that you cannot put a feeler gage with a thickness of
1.2 mm (0.0472 in.) into the gap between the input plate and the
ball carrier of the control valve detent.
(b) If the feeler gage goes in the gap, you must recenter the control
valve detent as specified in para. Job Set-Up, step C.
(2) On the panel 23VU:
(a) Push the FLT CTL/ELAC 1 pushbutton switch, (the OFF legend on
this pushbutton switch goes off).



EFF :
ALL
 27-44-00



AIJ




Page 520
Nov 01/09

(b) Push the FLT CTL/SEC 1 pushbutton switch, (the OFF legend on this
pushbutton switch goes off).
(3) On the panel 24VU:
(a) Push the FLT CTL/ELAC 2 pushbutton switch, (the OFF legend on
this pushbutton switch goes off).
(b) Push the FLT CTL/SEC 2 pushbutton switch, (the OFF legend on this
pushbutton switch goes off).
Subtask 27-44-00-410-053
F. Installation of the Caps
(1) On the left and right hydraulic valve blocks of the THS actuator (4):
(Ref. Fig. 502/TASK 27-44-00-991-003)

(2) Install the caps (6) on the valve control shafts (7).
(3) Safety the caps (6) with lockwire, corrosion-resistant steel, dia.
0.6 mm (0.024 in.).
(4) Safety the threaded bushes (5) with lockwire, corrosion-resistant
steel, dia. 0.6 mm (0.024 in.).
Subtask 27-44-00-710-055
G. Do an operational test of the THS actuator:
- with both hydraulic systems
and
- individual hydraulic system (Ref. TASK 27-44-00-710-003).
5. Close-up
________
Subtask 27-44-00-860-051
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the Green and Yellow hydraulic systems are
depressurized.
(Ref. TASK 29-23-00-864-001).
(2) Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).



EFF :
ALL
 27-44-00



AIJ




Page 521
Feb 01/07

(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


Subtask 27-44-00-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).



EFF :
ALL
 27-44-00


R 
AIJ




Page 522
Feb 01/07

TASK 27-44-00-710-002
Operational Test of the Trimmable Horizontal Stabilizer Actuator with the
Individual Hydraulic Systems
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274000-02
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-41-00-210-002
29-23-00-863-001
29-23-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Visual Inspection of the Pitch-Trim Control Wheel
Indicators
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-44-00



AIJ




Page 523
Feb 01/07

3. __________
Job Set-up
Subtask 27-44-00-865-051
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-44-00-860-054
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow and the Green hydraulic systems (Ref. TASK 2923-00-863-001).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(4) On the center pedestal on the ECAM control panel, push the F/CTL
pushbutton switch.
(5) Make sure that on the lower display unit (DU) of the ECAM, the F/CTL
page comes on.
4. Procedure
_________
Subtask 27-44-00-210-050
A. Do a visual inspection of the pitch-trim control wheel indicators
(Ref. TASK 27-41-00-210-002).



EFF :
ALL
 27-44-00


R 
AIJ




Page 524
Feb 01/07

Subtask 27-44-00-710-051
B. Do this test:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the maintenance panel 50VU:
- lift the guard and release the
HYD/LEAK MEASUREMENT VALVES/G
and HYD/LEAK MEASUREMENT
VALVES/Y pushbutton switches.

On the panel 50VU:


- the OFF legend on the G and Y
pushbutton switches come on.

2. On the center pedestal:


- turn the pitch-trim control
wheel in one direction.

The THS does not move.

3. On the maintenance panel 50VU:


- lift the guard and push the
HYD/LEAK MEASUREMENT VALVES/Y
pushbutton switch.

On the panel 50VU:


- the OFF legend on the Y pushbutton
switch goes off.

4. On the center pedestal:


- turn the pitch-trim control
wheel to the nose DN stop
position and then to the nose
UP stop position.

The THS moves to the fully nose down


and then to the fully nose up position.

5. On the panel 50VU:


- lift the guard and release the
HYD/LEAK MEASUREMENT VALVES/Y
and push the HYD/LEAK
MEASUREMENT VALVES/G pushbutton
switches.

On the panel 50VU:


- the OFF legend on the Y pushbutton
switch comes on.
- the OFF legend on the G pushbutton
switch goes off.

6. On the center pedestal:


- turn the pitch-trim control
wheel to the nose DN stop and
then to the O position.

The THS moves to the fully nose down


position and stop at the O position.

On the F/CTL page of the lower ECAM DU:


- the PITCH TRIM indication shows no
movement.

On the F/CTL page of the lower ECAM DU:


- the PITCH TRIM indication shows the
movement of the THS in both
directions.

On the lower ECAM DU, on the F/CTL


page:
- the PITCH TRIM indication shows the
movement of the THS.



EFF :
ALL
 27-44-00


R 
AIJ




Page 525
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------7. On the panel 50VU:
On the panel 50VU:
- lift the guard and push the
- the OFF legend on the Y pushbutton
HYD/LEAK MEASUREMENT VALVES/Y
switch goes off.
pushbutton switch.
5. Close-up
________
Subtask 27-44-00-860-053
A. Put the aircraft back to the serviceable condition.
(1) Depressurize the Green and Yellow hydraulic systems.
(Ref. TASK 29-23-00-864-001).
(2) Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-44-00


R 
AIJ




Page 526
Feb 01/07

TASK 27-44-00-710-003
Operational Test of the Trimmable Horizontal Stabilizer Actuator with both
(Green and Yellow) and Individual Hydraulic Systems
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-23-00-863-001
29-23-00-864-001
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-44-00-865-052
A. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-00



AIJ




Page 527
Feb 01/07

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
Subtask 27-44-00-860-055
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow and the Green hydraulic systems (Ref. TASK 2923-00-863-001).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(4) On the center pedestal on the ECAM control panel, push the F/CTL
pushbutton switch.
(5) Make sure that on the lower display unit (DU) of the ECAM, the F/CTL
page comes on.
4. Procedure
_________
Subtask 27-44-00-710-056
A. Do this test:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the center pedestal:
- turn the pitch-trim control
wheel to the nose DN stop
position and then to the nose
UP stop position.

The THS moves to the nose fully down


and then to the nose fully up position.

2. On the maintenance panel 50VU:


- lift the guard and release the
HYD/LEAK MEASUREMENT VALVES/G
and HYD/LEAK MEASUREMENT
VALVES/Y pushbutton switches.

On the panel 50VU:


- the OFF legend on the G and Y
pushbutton switches come on.

On the F/CTL page of the lower ECAM DU:


- the PITCH TRIM indication shows the
movement of the THS in both
directions.



EFF :
ALL
 27-44-00


R 
AIJ




Page 528
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------3. On the center pedestal:
The THS does not move.
- turn the pitch-trim control
wheel in one direction.
On the F/CTL page of the lower ECAM DU:
- the PITCH TRIM indication shows no
movement.
4. On the maintenance panel 50VU:
- lift the guard and push the
HYD/LEAK MEASUREMENT VALVES/Y
pushbutton switch.

On the panel 50VU:


- the OFF legend on the Y pushbutton
switch goes off.

5. On the center pedestal:


- turn the pitch-trim control
wheel to the nose DN stop
position and then to the nose
UP stop position.

The THS moves to the nose fully down


and then to the nose fully up position.

6. On the panel 50VU:


- lift the guard and release the
HYD/LEAK MEASUREMENT VALVES/Y
and push the HYD/LEAK
MEASUREMENT VALVES/G pushbutton
switches.

On the panel 50VU:


- the OFF legend on the Y pushbutton
switch comes on.
- the OFF legend on the G pushbutton
switch goes off.

7. On the center pedestal:


- turn the pitch-trim control
wheel to the nose DN stop and
then to the O position.

The THS moves to the fully nose down


position and stop at the O position.

8. On the panel 50VU:


- lift the guard and push the
HYD/LEAK MEASUREMENT VALVES/Y
pushbutton switch.

On the panel 50VU:


- the OFF legend on the Y pushbutton
switch goes off.

On the F/CTL page of the lower ECAM DU:


- the PITCH TRIM indication shows the
movement of the THS in both
directions.

On the lower ECAM DU, on the F/CTL


page:
- the PITCH TRIM indication shows the
movement of the THS.



EFF :
ALL
 27-44-00


R 
AIJ




Page 529
Feb 01/07

5. Close-up
________
Subtask 27-44-00-860-056
A. Put the aircraft back to the serviceable condition.
(1) Depressurize the Green and Yellow hydraulic systems.
(Ref. TASK 29-23-00-864-001).
(2) Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).



EFF :
ALL
 27-44-00


R 
AIJ




Page 530
Feb 01/07

ACTUATOR - THS (9CE) - REMOVAL/INSTALLATION


___________________________________________
TASK 27-44-51-000-001
Removal of the Trimmable Horizontal Stabilizer (THS) Actuator (9CE)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

adhesive tape
circuit breaker(s) safety clip(s)

No specific
No specific
No specific
No specific
No specific
No specific
No specific
No specific
A1-91-265
A3-91-267
0U145920
0U190360
0U190834
0U190844
98D27403500000
98D27407502000
98D27407533000
98D27408624000

protective padding
structural protection material
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
CAP - BLANKING
CONTAINER 5 L(1 1/2 USGAL)
COVER - BLANKING, HYDRAULIC RESISTANT
STEPLADDER 0.5 M (1.6 FT)
WARNING NOTICE(S)
HOIST-MINILIFT
HOIST-MINILIFT,THS ACTUATOR
TOOL - MANUAL CRANKING STOP, THS ACTUATOR
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
TOOL - ZERO POSITIONING, THS ACTUATOR
TOOL-RELEASE,POB
PITCH TRIM CONTROL LOCKING
SUPPORT STRUT-R I,THS ACTUATOR
FRAME - THS ACTUATOR SUPPORT
DEVICE-R I,THS ACTUATOR

1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1



EFF :
ALL
 27-44-51



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-710-001
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
29-23-00-863-001
29-23-00-863-002
27-44-51-991-001
27-44-51-991-021
27-44-51-991-002
27-44-51-991-003
27-44-51-991-014
27-44-51-991-004
27-44-51-991-005

Operational Test of the No-Back Device (No-Back


Pawls)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-44-51-991-001, 402/TASK 27-44-51-991-021)
Subtask 27-44-51-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
Subtask 27-44-51-860-050
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.



EFF :
ALL
 27-44-51



AIJ




Page 402
Feb 01/11

R
R

Job Set-Up
Figure 401/TASK 27-44-51-991-001



EFF :
ALL
 27-44-51



AIJ




Page 403
Feb 01/07

R
R

Manual Cranking Stop Tool Installation


Figure 402/TASK 27-44-51-991-021



EFF :
ALL
 27-44-51



AIJ




Page 404
Feb 01/07

(1) If the hydraulic pressure is available:


(a) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910002).
(b) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK
29-23-00-863-001) or (Ref. TASK 29-23-00-863-002).
(c) Turn the pitch-trim control wheel in the flight compartment and
put the THS actuator (1) to the zero position.
(d) Depressurize the Green and Yellow hydraulic systems and put them
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(e) Make sure that the Blue hydraulic system is depressurized and put
it in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(f) Depressurize the reservoirs of the Green and Yellow hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
R

(g) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the Green, the Yellow and the Blue hydraulic systems:
- In the cockpit on the hydraulic section 40VU of the overhead
panel
- On the ground service panels of the Green, the Yellow and the
Blue hydraulic systems.
(2) If the hydraulic pressure is not available:
(a) Depressurize the Green and Yellow systems and put them in the
maintenance configuration (Ref. TASK 29-00-00-864-001).
(b) Make sure that the Blue hydraulic system is depressurized and put
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(c) Depressurize the reservoirs of the Green and Yellow hydraulic
systems (Ref. TASK 29-14-00-614-001).

(d) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the Green, the Yellow and the Blue hydraulic systems:
- In the cockpit on the hydraulic section 40VU of the overhead
panel
- On the ground service panels of the Green, the Yellow and the
Blue hydraulic systems.



EFF :
ALL
 27-44-51



AIJ




Page 405
Nov 01/10

(e) Use the TOOL-RELEASE,POB (0U190844) and a 1/2 inch socket to move
the THS actuator (1) to the zero position (Ref. TASK 27-44-51710-001).
(3) Safety the THSA for removal:
(a) Put the TOOL - MANUAL CRANKING STOP, THS ACTUATOR (0U145920) (82)
in position on the screw jack (83). Do this on each side of the
nut assembly (2) of the THS actuator (1).
(b) Install and tighten the bolts (81).

(c) Put the WARNING NOTICE(S) in the flight compartment to tell


persons not to operate the pitch controls.
(d) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) in the mechanical input of the THS actuator (1).
(e) Put the TOOL - ZERO POSITIONING, THS ACTUATOR (0U190834) between
the THS actuator (1) and the nut assembly (2).

(f) Put the SUPPORT STRUT-R I,THS ACTUATOR (98D27407502000) in


position and set the THS in the 0 deg. position.
(g) Put the PITCH TRIM CONTROL LOCKING (98D27403500000) on the
pitch-trim control wheel in the flight compartment.
(h) Put the structural protection material in the area of the THS
actuator (1) to prevent damage to the aircraft structure.
Subtask 27-44-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51



AIJ




Page 406
Nov 01/10

4. Procedure
_________
(Ref. Fig. 403/TASK 27-44-51-991-002, 404/TASK 27-44-51-991-003, 405/TASK
27-44-51-991-014, 406/TASK 27-44-51-991-004, 407/TASK 27-44-51-991-005)
Subtask 27-44-51-020-050
A. Removal of the THS Actuator
(1) Disconnect the bonding straps (20), (21) and (22) from the THS
actuator (1)
(Ref. Fig. 403/TASK 27-44-51-991-002)
(a) Remove the nuts (25), the washers (24) and the bolts (23).
(b) Disconnect the bonding straps (20), (21) and (22) from the
brackets (26), (27) and (28).
(c) Safety the bonding straps (20), (21) and (22) clear of the THS
actuator (1).
(2) Disconnect the mechanical system link-plate (29) from the input lever
(30) of the THS actuator (1)
(Ref. Fig. 403/TASK 27-44-51-991-002)
(a) Remove and discard the cotter pins (37).
(b) Remove the nuts (38), the washers (39) and the bolts (40).
(c) Disconnect the link-plate (29) from the input lever (30).
(3) Disconnect the Green and the Yellow hydraulic systems from the THS
actuator (1)
(Ref. Fig. 403/TASK 27-44-51-991-002)
CAUTION : PUT APPLICABLE COVERS ON THE ELECTRICAL EQUIPMENT TO
_______
PREVENT CONTAMINATION BY HYDRAULIC FLUID.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION
_______
WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF
YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN
THE UNION TOO MUCH.
(a) Put the CONTAINER 5 L(1 1/2 USGAL) in position below the
hydraulic valve blocks (31) and (34).



EFF :
ALL
 27-44-51


R 
AIJ




Page 407
Aug 01/07

THS Actuator - Bonding Leads, Mechanical Input and Hydraulic Connections


Figure 403/TASK 27-44-51-991-002


EFF :
ALL
 27-44-51


R 
AIJ




Page 408
May 01/07

Electrical Connections
Figure 404/TASK 27-44-51-991-003


EFF :
ALL
 27-44-51


R 
AIJ




Page 409
May 01/07

Primary Upper Attachment


Figure 405/TASK 27-44-51-991-014



EFF :
ALL
 27-44-51



AIJ




Page 410
May 01/08

Removal and Installation Device 98D27408624000


Figure 406/TASK 27-44-51-991-004



EFF :
ALL
 27-44-51



AIJ




Page 411
Feb 01/08

Primary Lower Attachments


Figure 407/TASK 27-44-51-991-005



EFF :
ALL
 27-44-51



AIJ




Page 412
May 01/08

(b) Put the COVER - BLANKING, HYDRAULIC RESISTANT on the electrical


equipment, which is installed in the area below the THS actuator
(1).
(c) Disconnect the Green hydraulic system.
1
_

Cut and remove the lockwire from the union nuts of the
flexible hoses (32) and (33) to the valve block (31).

2
_

Disconnect the flexible hoses (32) and (33) from the high and
the low pressure connections of the valve block (31).

3
_

Put the CAP - BLANKING on the flexible hoses (32) and (33).

4
_

Put the CAP - BLANKING on the open connections of the valve


block (31).

5
_

Temporarily attach the flexible hoses (32) and (33) to the


aircraft structure, clear of the THS actuator (1).

(d) Disconnect the Yellow hydraulic system.


1
_

Cut and remove the lockwire from the union nuts of the
flexible hoses (35) and (36) to the valve block (34).

2
_

Disconnect the flexible hoses (35) and (36) from the high and
the low pressure connections of the valve block (34).

3
_

Put the CAP - BLANKING on the flexible hoses (35) and (36).

4
_

Put the CAP - BLANKING on the open connections of the valve


block (34).

5
_

Temporarily attach the flexible hoses (35) and (36) to the


aircraft structure, clear of the THS actuator (1).

(e) Remove the container from below the hydraulic valve blocks (31)
and (34).
(4) Disconnect the electrical connections from the THS actuator (1)
(Ref. Fig. 404/TASK 27-44-51-991-003)
(a) Disconnect the electrical connectors 9CE-E and 9CE-F (49) from
the command Rotary-Variable Differential-Transducer (RVDT) (50).
(b) Disconnect the electrical connectors 9CE-A, 9CE-B, 9CE-C and
9CE-D (51) from the pitch-trim actuator (52).



EFF :
ALL
 27-44-51



AIJ




Page 413
May 01/11

(c) Disconnect the electrical connectors 9CE-G and 9CE-H (53) from
the monitor RVDT (54).
(d) Put the CAP - BLANKING on the connections of the RVDTs (50) and
(54) and the pitch-trim actuator (52).
(e) Put the CAP - BLANKING on the open electrical connectors:
- 9CE-A, 9CE-B, 9CE-C, 9CE-D (51)
- 9CE-E, 9CE-F (49)
- 9CE-G, 9CE-H (53).
(5) Disconnect the primary upper attachment of the THS actuator (1)
(Ref. Fig. 405/TASK 27-44-51-991-014)
(a) Cut and remove the lockwire from the left and the right screws
(42).
(b) Remove the screws (42) and the washers (43). Make sure that the
washer (45) and (if installed) the shim(s) (44) do not fall from
the primary attachment.
NOTE : The washer (45) and (if applicable) the shim(s) (44) are
____
loose in the primary attachment and can fall when the
screws (42) are removed.
(c) Move the bolts (46) away from the connection of the attachment
forks (3) and the gimbal ring (41).
(d) Remove the washers (45) from between the bolts (46) the retainer
nuts (47) and (if installed) the shim(s) (44).
NOTE : Identify the locations of the shim(s) (44) and the washers
____
(45) to make the installation easier.
(e) Remove the bolts (46) from the connection of the attachment forks
(3) and the gimbal ring (41).
(f) Safety the sliding bushes (48) in the attachment forks (3) with
the adhesive tape.
(g) Safety the two spherical bearings (57) in the gimbal ring (41)
with the adhesive tape.
NOTE : The adhesive tape is used to safety the bearings (57)
____
during maintenance or movement of the THS actuator.



EFF :
ALL
 27-44-51


R 
AIJ




Page 414
Aug 01/07

Subtask 27-44-51-480-050
B. Installation of the R/I-Device THS Actuator
R

(1) Put the DEVICE-R I,THS ACTUATOR (98D27408624000) in position. If


necessary, use a STEPLADDER 0.5 M (1.6 FT) to help you install the
device.
(Ref. Fig. 406/TASK 27-44-51-991-004)
(2) Connect the transport rail 98D27408624040 to the applicable structure
points at STA3451 (FR72) with the pip pins.
(3) Put the adaptor 98D27408624110 between the transport rail
98D27408624040 and the applicable structure point at STA3406 (FR71).
(4) Connect the adaptor 98D27408624110 to the structure point at STA3406
(FR71) and to the transport rail 98D27408624040 with the pip pins.
(5) Put the rod 98D27408624042 in position at the applicable structure
points at STA3406 (FR71).
(6) Connect the rod 98D27408624042 to the structure points at STA3406
(FR71) with the pip pins.
(7) Connect the transport frame 98D27408624046 to the roller assembly of
the transport rail 98D27408624040 with the pip pin.
(8) Put the strives 98D27408624100 between the rod 98D27408624042 and the
brackets on the transport frame 98D27408624046.
(9) Connect the strives 98D27408624100 to the rod 98D27408624042 and to
the transport frame 98D27408624046 with the pip pins.
(10) Move the roller assembly attached to the transport frame
98D27408624046 along the transport rail 98D27408624040 to the THS
actuator (1).
(11) Put the transport frame 98D27408624046 in position on the THS
actuator (1).
(12) Connect the transport frame 98D27408624046 to the THS actuator (1)
with the lifting adaptors 98D27408624288.
(13) Move the spindle nut, on the threaded rod of the spindle
98D27408624118 to the center.



EFF :
ALL
 27-44-51



AIJ




Page 415
May 01/09

R
R

(14) Put the spindle 98D27408624118 between the rod 98D27408624042 and the
transport frame 98D27408624046.

R
R

(15) Connect the spindle 98D27408624118 to the rod 98D27408624042 and to


the transport frame 98D27408624046 with the pip pins.
(16) Install the HOIST-MINILIFT,THS ACTUATOR (A3-91-267) on the transport
rail 98D27408624040.
NOTE : If the HOIST-MINILIFT,THS ACTUATOR (A3-91-267) is not
____
available, you can also use the HOIST-MINILIFT (A1-91-265).

R
R

(17) Connect the fastener 98D27408624282 to the shackle of the HOISTMINILIFT,THS ACTUATOR (A3-91-267) with the pip pin.
Subtask 27-44-51-020-051

C. Removal of the THS Actuator

(1) Disconnect the primary lower attachment of the THS actuator (1):
(Ref. Fig. 407/TASK 27-44-51-991-005)
(a) Remove and discard the cotter pins (65).
(b) Remove the nuts (66) from the connection of the left and right
anti-rotation brackets (68) to the nut assembly (2).

(c) Remove the left and the right anti-rotation brackets (68).
(d) Install the nuts (66) again on the bolts (69) to hold the bolts
(69) in place.
(e) Release the retainer washers (71) from the retainer nuts (70).
(f) Hold the secondary bolts (74) with a wrench. Use a standard hook
wrench to remove the retainer nuts (70) from the secondary bolts
(74).
(g) Remove and discard the retainer washers (71).
(h) Release the retainer washers (73) from the retainer nuts (72).
(i) Hold the primary bolts (75) with a wrench. Use a standard hook
wrench to remove the retainer nuts (72) from the primary bolts
(75).
(j) Remove and discard the retainer washers (73).



EFF :
ALL
 27-44-51



AIJ




Page 416
Feb 01/08

R
R

(k) Remove the secondary bolts (74) and the primary bolts (75) from
the nut assembly (2).

R
R

(l) Move the sliding bushes (77) in the direction of the screwshaft
centerline, clear of the attachment arms (4).

R
R
R

(m) Put the protective padding on the valve outlets of the THS
actuator (1). This is to prevent damage to the pressure bulkhead
during the removal.

R
R

(2) Disconnect the secondary upper attachment (60) of the THS actuator
(1):
(Ref. Fig. 405/TASK 27-44-51-991-014)
(a) Hold the THS actuator (1) with the spindle 98D27408624118.
(Ref. Fig. 406/TASK 27-44-51-991-004)
(b) Remove and discard the cotter pins (61).
(c) Remove the parts that follow from the connection of the secondary
upper attachment (60) and the structure:
- The nuts (62)
- The washers (63)
- The bolts (64)
- The bushes (80).

R
R
R
R
R
R

(3) Use the support strut 98D27407502000, and put the stabilizer in a
nose down position (approximately -8 degrees).
(4) Lower the THS actuator (1).
(5) Remove the distance bushes (76) from the attachment arms (4).
(Ref. Fig. 407/TASK 27-44-51-991-005)

(6) Remove the pip pin and disconnect the spindle 98D27408624118 from the
transport frame 98D27408624046.
(Ref. Fig. 406/TASK 27-44-51-991-004)

R
R

(7) Remove the pip pins and disconnect the strives 98D27408624100 from
the transport frame 98D27408624046.
(Ref. Fig. 406/TASK 27-44-51-991-004)

R
R

(8) Temporarily safety the sliding bushes (77) and the shoulder bushes
(78) in the nut assembly (2). Do this at the primary lower attachment
with the adhesive tape.
(Ref. Fig. 407/TASK 27-44-51-991-005)



EFF :
ALL
 27-44-51



AIJ




Page 417
Feb 01/08

(9) Move the THS actuator (1) forward on the transport rail
98D27408624040 to a position above the access door 312AR.
(10) Connect the fastener 98D27408624282 to the secondary upper attachment
(60) with the pip pins.
(Ref. Fig. 406/TASK 27-44-51-991-004)
(11) Remove the lifting adaptors 98D27408624288 from the connection of the
transport frame 98D27408624046 to the THS actuator (1).
(Ref. Fig. 406/TASK 27-44-51-991-004)
(12) Remove the transport frame 98D27408624046.
R
R

(13) Put the FRAME - THS ACTUATOR SUPPORT (98D27407533000) or the FRAMETHS ACTUATOR,SUPPORT (98D27407533001) in position below the access
door 312AR.
(14) Lower the THS actuator (1) through the access door 312AR.

R
R

(15) Put the THS actuator (1) in position on the FRAME - THS ACTUATOR
SUPPORT (98D27407533000) or on the FRAME-THS ACTUATOR,SUPPORT
(98D27407533001).

R
R

(16) Connect the THS actuator (1) to the FRAME - THS ACTUATOR SUPPORT
(98D27407533000) or to the FRAME-THS ACTUATOR,SUPPORT
(98D27407533001) as applicable.
(17) Remove the pip pins and disconnect the fastener 98D27408624282 from
the secondary upper attachment (60).
(Ref. Fig. 406/TASK 27-44-51-991-004)
(18) Remove the oil breather cap (7) from the oil filler plug (5) and
install the storage cap (6).
(Ref. Fig. 401/TASK 27-44-51-991-001)



EFF :
ALL
 27-44-51



AIJ




Page 418
Nov 01/10

TASK 27-44-51-400-001
Installation of the Trimmable Horizontal Stabilizer (THS) Actuator (9CE)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
NOTE : If you install a complete new THS Actuator, only item (37) in the
____
expendable parts list is necessary.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

protective padding

R
R
R
R
R
R

No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific

No specific
No specific
A1-91-265
A3-91-267
0U145920

1
1
1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


CONTAINER - HYDRAULIC FLUID RESISTANT
COVER - BLANKING, HYDRAULIC RESISTANT
MAT - PROTECTIVE
WARNING NOTICE(S)
WRENCH - STANDARD
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 HOIST-MINILIFT
1 HOIST-MINILIFT,THS ACTUATOR
1 TOOL - MANUAL CRANKING STOP, THS ACTUATOR



EFF :
ALL
 27-44-51



AIJ




Page 419
May 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------0U190360
0U190834
98D27403500000
98D27407502000
98D27407517000
98D27407533000
98D27407533001
98D27408624000

1
1
1
1
1
1
1
1

PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


TOOL - ZERO POSITIONING, THS ACTUATOR
PITCH TRIM CONTROL LOCKING
SUPPORT STRUT-R I,THS ACTUATOR
TOOL SET-R I,THS
FRAME - THS ACTUATOR SUPPORT
FRAME-THS ACTUATOR,SUPPORT
DEVICE-R I,THS ACTUATOR

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 05-002
Material No. 05-005
Material No. 11-026
Material No. 19-010

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------37

cotter pins

27-41-04 04 -340



EFF :
ALL
 27-44-51



AIJ




Page 420
May 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-41-00-862-002
27-41-00-730-001
27-41-00-820-001
27-44-51-210-004
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
27-44-51-991-001
27-44-51-991-021
27-44-51-991-002
27-44-51-991-003
27-44-51-991-014
27-44-51-991-004
27-44-51-991-005
27-44-51-991-022
27-44-51-991-023

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)De-energize the Aircraft Electrical Circuits Supplied
from the External Power
System Test of the THS Actuator Electrical Control
Adjustment of the THS Zero Position
Check the Oil Level of the Gearbox of the
THS-Actuator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407
Fig. 408
Fig. 409

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-44-51-991-001, 403/TASK 27-44-51-991-002, 404/TASK
27-44-51-991-003)
Subtask 27-44-51-860-055
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
R

(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position below the access door 312AR.
(3) Make sure that the access door 312AR is open.



EFF :
ALL
 27-44-51



AIJ




Page 421
Feb 01/11

(4) Make sure that the pitch-trim control wheel in the flight compartment
is in the zero position.
(5) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed on the pitch-trim control wheel.
R

(6) Make sure that the WARNING NOTICE(S) are in position in the cockpit
to tell persons not to operate the pitch controls.
(7) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(8) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized.
(Ref. TASK 29-14-00-614-001).
(9) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
(10) Make sure that the aircraft electrical circuits are de-energized
(Ref. TASK 24-41-00-862-002).

R
R

(11) Make sure that the MAT - PROTECTIVE is in position in the area of the
THS actuator (1).

R
R

(12) Make sure that the COVER - BLANKING, HYDRAULIC RESISTANT are in
position on the electrical equipment, which is installed in the area
of the THS actuator (1).
Subtask 27-44-51-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51



AIJ




Page 422
May 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-44-51-991-001, 402/TASK 27-44-51-991-021, 403/TASK
27-44-51-991-002, 404/TASK 27-44-51-991-003, 405/TASK 27-44-51-991-014,
406/TASK 27-44-51-991-004, 407/TASK 27-44-51-991-005)
Subtask 27-44-51-560-050
A. Preparation of the Replacement Component
R
R

(1) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) and the TOOL - ZERO POSITIONING, THS ACTUATOR (0U190834)
are installed on the replacement THS actuator (1).

NOTE : The PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


____
and the TOOL - ZERO POSITIONING, THS ACTUATOR (0U190834) must
stay in position during the installation procedure.
(2) Remove the red protective caps from the ports of the hydraulic valve
blocks (31) and (34).
(Ref. Fig. 403/TASK 27-44-51-991-002)
(3) Make sure that the identification placards are correctly attached to
the casing of the THS actuator (1).
(4) Make sure that the protective padding is put on the valve outlets of
the THS actuator (1) to prevent damage.
Subtask 27-44-51-210-050
B. Inspection of the Work Area and the Attachment Components
(1) Clean the items that follow with the CLEANING AGENTS (Material No.
11-026) and let them dry:
- The attachment forks (3)
- The attachment arms (4)
- The bolts
- The bushes.
(2) Make sure the components that follow are installed correctly:
- The press-fit bushes (56) are not loose in the attachment forks (3)
- The retainer nuts (47) are safetied on the bushes (55).



EFF :
ALL
 27-44-51



AIJ




Page 423
May 01/09

(3) Do a visual inspection of the work area:


(a) Make sure that the items that follow are clean, not damaged and
show no corrosion:
- The attachment forks (3)
- The attachment arms (4)
- The flexible hoses (32), (33), (35) and (36)
- The mechanical input mechanism
- The electrical connectors 9CE-A, 9CE-B, 9CE-C, 9CE-D, 9CE-E,
9CE-F, 9CE-G and 9CE-H
- The adjacent structure.

(4) Do a visual inspection of the attachment components:


(a) Make sure that the items that follow are clean, not damaged and
show no corrosion:
- The bolts
- The nuts
- The bushes.
(b) Make sure that the two spherical bearings (57) are installed in
the gimbal ring (41).

R
R
R
R

NOTE : There are two spherical bearings installed in the upper


____
attachment of the THS actuator. One spherical bearing is
attached in the gimbal ring and the other spherical
bearing is free.

R
R

(5) Apply the corrosion preventive SPECIAL MATERIALS (Material No. 05005) to the shafts of the bolts (46).
Subtask 27-44-51-420-051

C. Installation of the THS Actuator


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.



EFF :
ALL
 27-44-51



AIJ




Page 424
May 01/08

R
R

(1) Put the FRAME - THS ACTUATOR SUPPORT (98D27407533000) or the FRAMETHS ACTUATOR,SUPPORT (98D27407533001) with the THS actuator (1) in
position. Do this below the access door 312AR.
(2) Use the HOIST-MINILIFT,THS ACTUATOR (A3-91-267) or the HOIST-MINILIFT
(A1-91-265) and put the THS actuator (1) in position.
(Ref. Fig. 406/TASK 27-44-51-991-004)
(3) Connect the fastener 98D27408624282 from the HOIST-MINILIFT,THS
ACTUATOR (A3-91-267) to the secondary upper attachment (60). Do this
with the pip pins.
(4) Disconnect the THS actuator (1) from the FRAME - THS ACTUATOR SUPPORT
(98D27407533000) or the FRAME-THS ACTUATOR,SUPPORT (98D27407533001)
as applicable.

(5) Use the HOIST-MINILIFT,THS ACTUATOR (A3-91-267) or the HOIST-MINILIFT


(A1-91-265) and lift the THS actuator (1) through the access door
312AR.
(6) Put the transport frame 98D27408624046 in position on the THS
actuator (1).
(7) Attach the transport frame 98D27408624046 to the THS actuator (1)
with the lifting adaptors 98D27408624288.
(8) Remove the pip pins and disconnect the fastener 98D27408624282 from
the secondary upper attachment (60).
(9) Move the roller assembly which is attached to the transport frame
98D27408624046 along the transport rail 98D27408624040.
(10) Put the THS actuator (1) in position in front of the attachment forks
(3) and the attachment arms (4).
(11) Make sure that the mechanical input connection is on the left in the
flight direction.
(Ref. Fig. 401/TASK 27-44-51-991-001)
(12) Hold the THS actuator (1) in position.
(13) Connect the strives 98D27408624100 to the transport frame
98D27408624046 with the pip pins.
(14) Adjust the spindle nut to the center on the threaded rod of the
spindle 98D27408624118.



EFF :
ALL
 27-44-51



AIJ




Page 425
Nov 01/10

(15) Connect the spindle 98D27408624118 to the transport frame


98D27408624046 with the pip pin.
(16) Remove the FRAME - THS ACTUATOR SUPPORT (98D27407533000) or the
FRAME-THS ACTUATOR,SUPPORT (98D27407533001) as applicable, from below
the access door 312AR.

(17) Remove the adhesive tape from the bushes (48), (55) and (56) in the
attachment forks (3).
(18) Remove the adhesive tape from the bearing (57) and the gimbal ring
(41).
(Ref. Fig. 405/TASK 27-44-51-991-014)
(19) Use the spindle 98D27408624118 to lift the THS actuator (1).
(Ref. Fig. 406/TASK 27-44-51-991-004)
(20) Use the support strut 98D27407502000 and put the stabilizer in the 0
degrees position.
(21) Connect the primary upper attachment of the THS actuator (1):
(Ref. Fig. 405/TASK 27-44-51-991-014)
(a) Move the sliding bushes (48) to a position where you can install
the primary upper attachment.
(b) Put the THS actuator (1) in position at the attachment forks (3).
(c) On the LH side of the THS actuator, push the sliding bush (48)
against the bearing (57). Do the same for the RH side.
(d) Engage the bolts (46) at the connections of the attachment forks
(3) and the gimbal ring (41). Push in the two bolts (46) fully.
(e) Make sure that the washers (45) and (if applicable) the shim(s)
(44), fill the space between:
- The flange of the bolt (46) and the retainer nut (47).
NOTE : The washer (45) is thicker than the washer (43).
____
(f) If the space is not filled, or the bolt (46) is pushed back,
remove or add the shim(s) (44) as necessary.
(g) Install the screws (42) and the washers (43).
(h) TORQUE the screws (42) to between 0.3 and 0.35 m.daN (26.54 and
30.97 lbf.in).



EFF :
ALL
 27-44-51



AIJ




Page 426
Nov 01/10

(i) Safety the screws with lockwire:


WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.
_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
1
_

Safety the screws (42) with the lockwire MISCELLANEOUS


(Material No. 19-010).

(22) Connect the secondary upper attachment (60) of the THS actuator (1):
(Ref. Fig. 405/TASK 27-44-51-991-014)
(a) Make sure that the bushes (84) are correctly installed in the
structure lug.
(b) Put the secondary upper attachment (60) in position on the
structure lug.
(c) Make sure that the shouldered bushes (79) are correctly installed
in the connection of the secondary upper attachment (60).
(d) Apply the zinc chromate putty SPECIAL MATERIALS (Material No. 05002) to the bushes (80).
(e) Put the bushes (80) on the bolts (64).
(f) Install the bolts (64) with the bushes (80), the washers (63) and
the nuts (62). Do this at the connection of the secondary upper
attachment (60) and the structure lug.
(g) TORQUE the nuts (62) to between 1.95 and 2.2 m.daN (14.38 and
16.22 lbf.ft).
(h) Safety the nuts (62) with the new cotter pins (61).
Subtask 27-44-51-080-050
D. Removal of the R/I-Device THS Actuator
(1) Remove the pip pin and disconnect the fastener 98D27408624282 from
the shackle of the HOIST-MINILIFT,THS ACTUATOR (A3-91-267).
(2) Remove the HOIST-MINILIFT,THS ACTUATOR (A3-91-267) or the HOISTMINILIFT (A1-91-265) from the transport rail 98D27408624040.
(3) Remove the DEVICE-R I,THS ACTUATOR (98D27408624000):
(Ref. Fig. 406/TASK 27-44-51-991-004)
(a) Remove the pip pin and disconnect the spindle 98D27408624118 from
the transport frame 98D27408624046.



EFF :
ALL
 27-44-51


R 
AIJ




Page 427
Nov 01/09

(b) Remove the pip pin and disconnect the spindle 98D27408624118 from
the rod 98D27408624042.
(c) Remove the spindle 98D27408624118.
(d) Remove the pip pins and disconnect the strives 98D27408624100
from the transport frame 98D27408624046.
(e) Remove the pip pins and disconnect the strives 98D27408624100
from the rod 98D27408624042.
(f) Remove the strives 98D27408624100.
(g) Remove the lifting adaptors 98D27408624288 and disconnect the
transport frame 98D27408624046 from the THS actuator (1).
(h) Remove the pip pin and disconnect the transport frame
98D27408624046 from the roller assembly of the transport rail
98D27408624040.
(i) Remove the transport frame 98D27408624046.
(j) Remove the pip pin and disconnect the adaptor 98D27408624110 from
the structure point at STA3408 (FR71).
(k) Remove the pip pin and disconnect the adaptor 98D27408624110 from
the transport rail 98D27408624040.
(l) Remove the adaptor 98D27408624110.
(m) Remove the pip pins and disconnect the transport rail
98D27408624040 from the structure points at STA3451 (FR72).
(n) Remove the transport rail 98D27408624040.
(o) Remove the pip pins and disconnect the rod 98D27408624042 from
the structure points at STA3408 (FR71).
(p) Remove the rod 98D27408624042.
(q) If necessary, remove the stepladder.



R
EFF :
ALL
 27-44-51



AIJ




Page 428
May 01/11

Subtask 27-44-51-420-050
E. Installation of the THS Actuator
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
(1) Connect the bonding straps (20), (21) and (22) to the THS actuator
(1).
(Ref. Fig. 403/TASK 27-44-51-991-002)
(a) Disconnect the bonding straps (20), (21) and (22) from the
temporary safety positions.
(b) Put the bonding straps (20), (21) and (22) in position at the
brackets (26), (27) and (28).
(c) Install the bolts (23), the washers (24) and the nuts (25)
(Ref. TASK 20-28-00-912-004).
(2) Connect the Green and the Yellow hydraulic systems to the THS
actuator (1).
(Ref. Fig. 403/TASK 27-44-51-991-002)
R

(a) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the


hydraulic valve blocks (31) and (34).
(b) Connect the Yellow hydraulic system.
1
_

Remove the flexible hoses (35) and (36) from the temporary
attachment positions on the structure.

2
_

Remove the blanking caps from the flexible hoses (35) and
(36).

3
_

Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the


threads of the line end-fittings.

4
_

Remove the blanking caps from the hose connections of the


valve block (34).



EFF :
ALL
 27-44-51



AIJ




Page 429
May 01/11

5
_

Connect the flexible hoses (35) and (36) to the high and the
low pressure connections of the valve block (34).

6
_

TORQUE the union nut of the flexible hose (35) to between 2.9
and 3.2 m.daN (21.38 and 23.59 lbf.ft).

7
_

TORQUE the union nut of the flexible hose (36) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).

8
_

Safety the union nuts with the lockwire:


WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE
_______
LOCKWIRE. CUT, REMOVE AND DISCARD THE LOCKWIRE AS
YOU DO THE TASK. LOOSE LOCKWIRE CAN CUT OR BLIND
YOU.
a
_

Safety the union nuts of the flexible hoses (35) and (36)
to the valve block (34) with the lockwire MISCELLANEOUS
(Material No. 19-010).

(c) Connect the Green hydraulic system.


1
_

Remove the flexible hoses (32) and (33) from the temporary
attachment positions on the structure.

2
_

Remove the blanking caps from the flexible hoses (32) and
(33).

3
_

Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the


threads of the line end-fittings.

4
_

Remove the blanking caps from the hose connections of the


valve block (31).

5
_

Connect the flexible hoses (32) and (33) to the high and the
low pressure connections of the valve block (31).

6
_

TORQUE the union nut of the flexible hose (32) to between 2.9
and 3.2 m.daN (21.38 and 23.59 lbf.ft).

7
_

TORQUE the union nut of the flexible hose (33) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).



EFF :
ALL
 27-44-51


R 
AIJ




Page 430
May 01/11

8
_

Safety the union nuts with the lockwire:


WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE
_______
LOCKWIRE. CUT, REMOVE AND DISCARD THE LOCKWIRE AS
YOU DO THE TASK. LOOSE LOCKWIRE CAN CUT OR BLIND
YOU.
a
_

Safety the union nuts of the flexible hoses (32) and (33)
to the valve block (31) with the lockwire MISCELLANEOUS
(Material No. 19-010).

(3) Connect the primary lower attachment of the THS actuator (1).
(Ref. Fig. 407/TASK 27-44-51-991-005)
(a) Remove the adhesive tape which temporarily safetied the sliding
bushes (77) and the shoulder bushes (78) in the nut assembly (2).
(b) Make sure that the sliding bushes (77) and the shoulder bushes
(78) are correctly installed in the nut assembly (2).
(c) Put the nut assembly (2) in position at the attachment arms (4).
(d) Push the sliding bushes (77) in the direction of the screwshaft
centerline.
(e) Put the distance bushes (76) into the installation nuts of the
spherical bearings installed in the attachment arms (4).
(f) Put the bolts (69) in the forks of the nut assembly (2).
(g) Move the THS actuator (1) into a position so that both forks of
the nut assembly (2) overlap the attachment arms (4).
(h) Push the sliding bushes (77) against the inner ring of the
spherical bearings in the attachment arms (4). If necessary, use
the SUPPORT STRUT-R I,THS ACTUATOR (98D27407502000) and move the
THS to get the necessary alignment of the sliding bushes (77) and
the spherical bearings.
(i) Install the primary bolts (75) at the connection of the nut
assembly (2) and the attachment arms (4). Make sure that the
primary bolts (75) are installed with the flats on the flanges in
the horizontal direction.



EFF :
ALL
 27-44-51


R 
AIJ




Page 431
May 01/11

(j) Install the new retainer washers (73) and the retainer nuts (72)
on the primary bolts (75). Make sure that the rounded edge of the
retainer nuts (72) point to the retainer washers (73).
(Ref. Fig. 407/TASK 27-44-51-991-005)
(k) Tighten the primary bolts (75).

1
_

Put the wrench 98D27407517120, part of the TOOL SET-R I,THS


(98D27407517000), on the retainer nuts (72).

2
_

Hold the primary bolts (75) with a WRENCH - STANDARD.

3
_

TORQUE the retainer nuts (72) to between 4.0 and 5.0 m.daN
(29.49 and 36.87 lbf.ft).

4
_

Remove the wrenches from the primary bolts (75) and the
retainer nuts (72).

(l) Safety the retainer nuts (72) with the retainer washers (73).
(m) Install the secondary bolts (74) through the primary bolts (75).
(n) Make sure that the secondary bolts (74) have been installed with
the flats on the flanges in the horizontal direction.
(o) Install the new retainer washers (71) and the retainer nuts (70)
on the secondary bolts (74). Make sure that the rounded edges of
the retainer nuts (70) point to the retainer washers (71).
(Ref. Fig. 407/TASK 27-44-51-991-005)
(p) Tighten the secondary bolts (74).

1
_

Put the wrench 98D27407517110, part of TOOL SET-R I,THS


(98D27407517000), on the retainer nuts (70).

2
_

Hold the secondary bolts (74) with a WRENCH - STANDARD.

3
_

TORQUE the retainer nuts (70) to between 3.0 and 4.0 m.daN
(22.12 and 29.49 lbf.ft).

4
_

Remove the wrenches from the secondary bolts (74) and from the
retainer nuts (70).

(q) Safety the retainer nuts (70) with the retainer washers (71).
(r) Remove the nuts (66) to access the bolts for the anti-rotation
brackets (68).



EFF :
ALL
 27-44-51



AIJ




Page 432
May 01/11

(s) Put the left and the right anti-rotation brackets (68) in
position at the connections of the nut assembly (2) and the bolts
(69), (74) and (75).
(t) Install the nuts (66).
(u) Safety the nuts (66) with new cotter pins (65).
(4) Connect the mechanical system link-plate (29) to the input lever (30)
of the THS actuator (1).
(Ref. Fig. 403/TASK 27-44-51-991-002)
(a) Put the link-plate (29) in position at the input lever (30).
(b) Install the bolts (40), the washers (39) and the nuts (38).
NOTE : If you cannot install the bolts (40) easily, adjust the
____
mechanical control system (Ref. TASK 27-41-00-820-001).
(c) TORQUE the nuts (38) to 0.8 m.daN (70.79 lbf.in) .
(d) Safety the nuts (38) with new cotter pins (37).
(5) Connect the electrical connections to the THS actuator (1).
(Ref. Fig. 404/TASK 27-44-51-991-003)
(a) Remove the blanking caps from the electrical connectors:
- 9CE-A, 9CE-B, 9CE-C and 9CE-D (51)
- 9CE-E and 9CE-F (49)
- 9CE-G and 9CE-H (53).
(b) Remove the blanking caps from the electrical connections of the
RVDT (50) and (54) and the pitch-trim actuator (52).
(c) Connect the electrical connectors 9CE-G and 9CE-H (53) to the
monitor RVDT (54).
(d) Connect the electrical connectors 9CE-A, 9CE-B, 9CE-C and 9CE-D
(51) to the pitch-trim actuator (52).
(e) Connect the electrical connectors 9CE-E and 9CE-F (49) to the
command RVDT (50).



EFF :
ALL
 27-44-51


R 
AIJ




Page 433
May 01/11

INTENTIONALLY BLANK



R

 27-44-51



AIJ




Page 434
May 01/11

Subtask 27-44-51-860-051
F. Aircraft Maintenance Configuration
R

(1) Remove the SUPPORT STRUT-R I,THS ACTUATOR (98D27407502000) from the
THS.
(2) Remove the bolts (81) and the TOOL - MANUAL CRANKING STOP, THS
ACTUATOR (0U145920) (82) from the screw jack (83). Do this on each
side of the nut assembly (2) of the THS actuator (1).
(3) Remove the TOOL - ZERO POSITIONING, THS ACTUATOR (0U190834) from
between the THS actuator (1) and the nut assembly (2).
(4) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)
from the mechanical input of the THS actuator (1).
(5) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the
pitch-trim control wheel in the flight compartment.
(6) Remove the storage cap (6) from the oil filler plug (5) and install
the oil breather cap (7).
(7) Remove the drainage container from below the hydraulic valve blocks
of the THS actuator.
(8) Remove the covers from the electrical equipment which is installed
below the THS actuator.
(9) Remove the structural protection material from the work area.
Subtask 27-44-51-865-051
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.



EFF :
ALL
 27-44-51



AIJ




Page 435
Nov 01/10

Subtask 27-44-51-720-050
H. Test
R
R

(1) Make sure that the THS actuator (1) has the correct quantity of oil.
If necessary, fill the THS actuator (Ref. TASK 27-44-51-210-004).
(2) Do a system test of the THS control (Ref. TASK 27-41-00-730-001).
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(3) Do a visual check of the THS actuator and make sure that there is no
leakage from:
- The hydraulic connections
- The oil filler-plug connection
- The oil drain-plug connection
- The body of the THS actuator.

R
R
R
R
R

Subtask 27-44-51-210-059

J. Final Inspection

R
R

(1) Inspect the lower attachment on the THSA.


(Ref. Fig. 408/TASK 27-44-51-991-022)

R
R
R
R
R
R
R
R
R

(a) Make sure that the parts that follow are installed on the LH and
RH side:
- The shafts (74) and (75)
- The brackets (68)
- The nuts (66)
- The cotter pins (65)
- The retainer nuts (70) and (72)
- The retainer washers (71) and (73)
- The shoulder bush (78).

R
R

(2) Inspect the upper primary attachment on the THSA.


(Ref. Fig. 409/TASK 27-44-51-991-023)

R
R
R
R
R
R
R

(a) Make sure that the parts that follow are installed on the LH and
RH side:
- The bearing (57)
- The bush (56)
- The locking washer (55)
- The retainer nut (47)
- The washer (44) and (if applicable) the shim(s) (45)



EFF :
ALL
 27-44-51



AIJ




Page 436
May 01/07

- The attaching screws (42)


- The locking wire.
(b) Use a ruler to measure the depth of the sliding bush (48) for the
LH and RH side of the THSA. The depth must be between 6.0 mm and
7.5 mm (0.240 in. and 0.300 in.). The measurment can be done from
the radius of both sides of the bolt (46).
(3) Inspect the upper secondary attachment of the THSA.
(Ref. Fig. 409/TASK 27-44-51-991-023)
(a) Make sure that the parts that follow are installed:
- The bolts (64)
- The washers (63)
- The nuts (62)
- The cotter pins (61).
5. Close-up
________
Subtask 27-44-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(5) Remove the warning notice(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 437
Aug 01/07

R
R

Inspection of the Lower THSA Attachment


Figure 408/TASK 27-44-51-991-022- 12 (SHEET 1)



EFF :
ALL
 27-44-51



AIJ




Page 438
May 01/07

R
R

Inspection of the Lower THSA Attachment


Figure 408/TASK 27-44-51-991-022- 22 (SHEET 2)



EFF :
ALL
 27-44-51



AIJ




Page 439
May 01/07

R
R

Inspection of the Upper THSA Attachment


Figure 409/TASK 27-44-51-991-023- 13 (SHEET 1)



EFF :
ALL
 27-44-51



AIJ




Page 440
May 01/07

R
R

Inspection of the Upper THSA Attachment


Figure 409/TASK 27-44-51-991-023- 23 (SHEET 2)



EFF :
ALL
 27-44-51



AIJ




Page 441
May 01/07

R
R

Inspection of the Upper THSA Attachment


Figure 409/TASK 27-44-51-991-023- 33 (SHEET 3)



EFF :
ALL
 27-44-51



AIJ




Page 442
May 01/07

TASK 27-44-51-000-002
Removal of the Oil Filler Plug and/or the Oil Drain Plug from the THS Actuator
(9CE)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

warning notices

R
R
R
R

No specific
No specific
No specific
No specific
0U190364

1
1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


CAP - BLANKING
COVER - BLANKING, HYDRAULIC RESISTANT
WARNING NOTICE(S)
TOOL - DRAIN, THSA

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-991-006

Fig. 410



EFF :
ALL
 27-44-51



AIJ




Page 443
May 01/11

3. __________
Job Set-up
Subtask 27-44-51-010-051
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.
(2) Open the access door 312AR.
Subtask 27-44-51-941-057
B. Put the warning notices in the flight compartment to tell persons not to
operate the pitch controls.
4. Procedure
_________
(Ref. Fig. 410/TASK 27-44-51-991-006)
Subtask 27-44-51-020-052
A. Removal of the Oil Filler Plug and/or the Oil Drain Plug
(1) Removal of the oil filler plug (81).
(a) Disconnect the breather cap (80) from the oil filler plug (81).
(b) Cut and remove the lockwire from the oil filler plug (81).
(c) Remove the oil filler plug (81) from the adaptor (83).
(d) Remove and discard the O-ring (82) from the oil filler plug (81).
NOTE : Do not remove the adaptor (83) from the THS actuator (1)
____
unless a repair or a new installation is necessary.
R

(e) Put a CAP - BLANKING on the adaptor (83).


(2) Removal of the oil drain plug (86).

(a) Put a WARNING NOTICE(S) in position below the THS actuator (1).
(b) Remove the protective cap (84), complete with the magnetic chip
detector (85), from the oil drain plug (86).
(c) Install the TOOL - DRAIN, THSA (0U190364).



EFF :
ALL
 27-44-51



AIJ




Page 444
May 01/11

Oil Filler Plug and Oil Drain Plug


Figure 410/TASK 27-44-51-991-006



EFF :
ALL
 27-44-51



AIJ




Page 445
May 01/07

(d) Drain the oil from the THS actuator (1) into the drainage
container.
(e) Remove the TOOL - DRAIN, THSA.
(f) Cut and remove the lockwire from the oil drain plug (86).
(g) Remove the oil drain plug (86).
(h) Remove and discard the O-ring (87) from the oil drain plug (86).
R

(i) Put a COVER - BLANKING, HYDRAULIC RESISTANT in the opening for


the oil drain plug (86) in the THS actuator (1).



EFF :
ALL
 27-44-51



AIJ




Page 446
May 01/11

TASK 27-44-51-400-002
Installation of the Oil Filler Plug and/or the Oil Drain Plug in the THS
Actuator (9CE)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No
No

specific
specific
specific
specific
specific

1
1
1
1

ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE


CONTAINER - HYDRAULIC FLUID RESISTANT
PLUG - BLANKING
WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 03-003
Material No. 19-010

USA MIL-PRF-7808
LUBRICATING OIL TURBINE SYNTHETIC BASE
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 447
May 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------82
87
87

O-ring
O-ring
O-ring

27-44-51 02 -080
27-44-51 02 -040
27-44-51 02 -040C

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-13-27-612-001
27-44-51-991-006

Oil Replenishment of the THS Actuator (9CE)


Fig. 410

3. __________
Job Set-up
(Ref. Fig. 410/TASK 27-44-51-991-006)
Subtask 27-44-51-860-056
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position below the access door 312AR.
(2) Make sure that the access door 312AR is open.
R

(3) Make sure that the WARNING NOTICE(S) are in position in the flight
compartment to tell persons not to operate the pitch controls.

(4) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in


position below the THS actuator, if you install the oil drain plug
(86).



EFF :
ALL
 27-44-51



AIJ




Page 448
May 01/11

Subtask 27-44-51-210-052
B. Visual Inspection of the Work Area and the Components
(1) Visual inspection of the work area.
(a) Make sure that:
- the area adjacent to the oil filler plug (81),
- the area adjacent to the oil drain plug (86)
are clean, not damaged and shows no corrosion.
(2) Visual inspection of the components.
(a) Make sure that:
- the breather cap (80),
- the adaptor (83),
- the protective cap (84) complete with the magnetic chip
detector (85)
are clean, not damaged and show no corrosion.
(b) Make sure that the adaptor (83) is correctly installed in the THS
actuator (1).
4. Procedure
_________
R

(Ref. Fig. 410/TASK 27-44-51-991-006)


Subtask 27-44-51-420-052
A. Installation of the Oil Filler Plug and/or the Oil Drain Plug
(1) Installation of the oil filler plug (81).
(a) Remove the PLUG - BLANKING from the adaptor (83).
(b) Make sure that the oil filler plug (81) and the adaptor interface
(83) are clean.
(c) Lubricate the new O-ring (82) with the oil OILS (Material No. 03003).
(d) Put the new O-ring (82) in position on the oil filler plug (81).
(e) Install the oil filler plug (81) in the adaptor (83).
(f) TORQUE the oil filler plug (81) to between 1.4 and 1.6 m.daN
(10.32 and 11.79 lbf.ft).



EFF :
ALL
 27-44-51



AIJ




Page 449
May 01/07

(g) Safety the oil filler plug (81) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(h) Connect the breather cap (80) to the oil filler plug (81).
(2) Installation of the oil drain plug (86).
(a) Remove the PLUG - BLANKING from the opening for the oil drain
plug (86) in the THS actuator (1).
(b) Make sure that the oil drain plug (86) and the plug interface are
clean.
(c) Lubricate the new O-ring (87) with the oil OILS (Material No. 03003).
(d) Put the new O-ring (87) in position on the oil drain plug (86).
(e) Install the oil drain plug (86) in the THS actuator (1).
(f) TORQUE the oil drain plug (86) to between 1.4 and 1.6 m.daN
(10.32 and 11.79 lbf.ft).
(g) Safety the oil drain plug (86) with the lockwire MISCELLANEOUS
(Material No. 19-010).
(h) Install the protective cap (84), with the magnetic chip detector
(85), on the oil drain plug (86).
(i) Fill the THS actuator (1) with the correct oil to the necessary
level (Ref. TASK 12-13-27-612-001).
(j) Remove the drainage container from below the THS actuator (1).
5. Close-up
________
Subtask 27-44-51-210-053
A. Do a visual check of the THS actuator and make sure that there are no
leaks from:
- the oil filler plug and adaptor,
- the oil drain plug.



EFF :
ALL
 27-44-51


R 
AIJ




Page 450
May 01/07

Subtask 27-44-51-410-051
B. Close Access
(1) Remove the warning notices.
(2) Make sure that the work area is clean and clear of tools and other
items.
(3) Close the access door 312AR.
(4) Remove the access platform(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 451
May 01/07

TASK 27-44-51-000-003
Removal of the Lower Claw Stop
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
0U145409
0U145920
0U190360
0U190844
98D27403500000

1
1
1
1
2
1

circuit breaker(s) safety clip(s)


warning notices
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
SPECIAL WRENCH
TOOL - MANUAL CRANKING STOP, THS ACTUATOR
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
TOOL-RELEASE,POB
PITCH TRIM CONTROL LOCKING



EFF :
ALL
 27-44-51



AIJ




Page 452
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-710-001
29-00-00-864-001
29-23-00-863-001
29-23-00-863-002
27-44-51-991-001
27-44-51-991-016

Operational Test of the No-Back Device (No-Back


Pawls)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Fig. 401
Fig. 411

3. __________
Job Set-up
Subtask 27-44-51-010-062
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
Subtask 27-44-51-860-057
B. Aircraft Maintenance Configuration
(Ref. Fig. 401/TASK 27-44-51-991-001)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2923-00-863-001) and (Ref. TASK 29-23-00-863-002).
(2) Turn the pitch-trim control wheel in the flight compartment and put
the THS actuator to the zero position.
(3) Depressurize the Green and Yellow hydraulic systems and put them in
the maintenance configuration (Ref. TASK 29-00-00-864-001).



EFF :
ALL
 27-44-51



AIJ




Page 453
Feb 01/11

(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Put the warning notices in position to tell persons not to pressurize
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
(6) If hydraulic pressure is not available, use the manual drive input
and move the THS actuator to the zero position.
(a) Put the TOOL - MANUAL CRANKING STOP, THS ACTUATOR (0U145920) in
position on the screw of the THS actuator.
R

(b) Use the TOOL-RELEASE,POB (0U190844) and a 1/2 inch socket to


position the THS actuator (Ref. TASK 27-44-51-710-001).
(7) Put the warning notices in the flight compartment to tell persons not
to operate the pitch controls.
(8) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator.
(9) Put the PITCH TRIM CONTROL LOCKING (98D27403500000) on the pitch-trim
control wheel in the flight compartment.
Subtask 27-44-51-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51



AIJ




Page 454
Nov 01/10

4. Procedure
_________
R

(Ref. Fig. 411/TASK 27-44-51-991-016)


Subtask 27-44-51-020-053
A. Removal of the Lower Claw Stop
(1) Make sure that there is a mark for the correct location of the claw
stop (112) and the screw (110). If there is no mark use a marker to
mark the keys (118) in relation to the claw stop (112) and to the
screw (110).
(2) Release the tabwasher (116) and remove the nut (117) with the SPECIAL
WRENCH (0U145409).
(3) Remove the tabwasher (116) and the springwasher (115) from the fail
safe tie-bar (111).
(4) Discard the tabwasher (116).
(5) Remove and discard the lockwire from the screws (114).
(6) Remove the screws (114), the washers (113) and the lower claw stop
(112).
(7) If necessary, remove the two keys (118) with the studs (119).



EFF :
ALL
 27-44-51



AIJ




Page 455
May 01/07

Lower Claw Stop


Figure 411/TASK 27-44-51-991-016



EFF :
ALL
 27-44-51



AIJ




Page 456
May 01/07

TASK 27-44-51-400-003
Installation of the Lower Claw Stop
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

R
R

No specific
0U145409
0U190360
98D27403500000

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 SPECIAL WRENCH
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
1 PITCH TRIM CONTROL LOCKING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
Material No. 19-010

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 457
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-23-00-863-001
29-23-00-863-002
29-23-00-864-001
27-44-51-991-016

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Fig. 411

3. __________
Job Set-up
Subtask 27-44-51-860-058
A. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position below the access door 312AR.
(2) Make sure that the access door 312AR is open.
(3) Make sure that the pitch-trim control wheel in the flight compartment
is in the zero position.
(4) Make sure that the PITCH TRIM CONTROL LOCKING (98D27403500000) is
installed on the pitch-trim control wheel.
(5) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the pitch controls.
(6) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).



EFF :
ALL
 27-44-51



AIJ




Page 458
Feb 01/11

(7) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
R
R

(8) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) is installed in the mechanical input of the THS actuator.
Subtask 27-44-51-865-058
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
4. Procedure
_________
(Ref. Fig. 411/TASK 27-44-51-991-016)
Subtask 27-44-51-420-053
A. Installation of the Lower Claw Stop
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Install the keys (118) if removed.
(2) Make sure that the studs (119) are in position in the keys (118).



EFF :
ALL
 27-44-51



AIJ




Page 459
May 01/09

(3) Put the lower claw stop (112) in position as marked in the before
removal.
(4) Install the screws (114) with the washers (113).
(5) TORQUE the screws (114) to between 0.30 and 0.35 m.daN (26.54 and
30.97 lbf.in).
(6) Safety the screws (114) with MISCELLANEOUS (Material No. 19-010).
(7) Apply SPECIAL MATERIALS (Material No. 05-002) to the nut (117).
(8) Install the springwasher (115), the new tabwasher (116) and the nut
(117) onto the fail safe tie-bar (111).
(9) TORQUE the nut (117) to between 5.0 and 6.0 m.daN (36.87 and 44.24
lbf.ft) with the SPECIAL WRENCH (0U145409).
(10) Safety the nut (117) with the tabwasher (116).
Subtask 27-44-51-860-059
B. Aircraft Maintenance Configuration
R

(1) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)


from the mechanical input of the THS actuator.
(2) Remove the PITCH TRIM CONTROL LOCKING (98D27403500000) from the
pitch-trim control wheel in the flight compartment.
(3) Remove the warning notice(s).
Subtask 27-44-51-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.
Subtask 27-44-51-710-051
D. Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.



EFF :
ALL
 27-44-51



AIJ




Page 460
May 01/09

(1) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2923-00-863-001) and (Ref. TASK 29-23-00-863-002).
(2) Turn the pitch-trim control wheel in the flight compartment and put
the THS actuator to the 13.5 deg. UP position.
(3) Make sure that the distance between the lower claw stop (112) and the
nut assembly (120) is not less than 8 mm (0.3149 in.).
(4) Turn the pitch-trim control wheel in the flight compartment and put
the THS actuator to the zero position.
(5) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-2300-864-001).
5. Close-up
________
Subtask 27-44-51-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform.



EFF :
ALL
 27-44-51



AIJ




Page 461
May 01/07

TASK 27-44-51-960-001
Replacement of the Filter Assy in Valve Block of the THS Actuator
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 CONTAINER 3 L(3/4 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-44-51



AIJ




Page 462
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
Material No. 11-002
Material No. 19-003

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2

packing

27-44-55 01 -020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-00-720-001
27-44-51-210-004
29-00-00-864-001
29-00-00-910-002
29-14-00-614-001
27-44-51-991-020

Functional Test of the THS-Actuator Overtravel


Related to the Mechanical Indicator
Check the Oil Level of the Gearbox of the
THS-Actuator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 412

3. __________
Job Set-up
Subtask 27-44-51-010-065
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 463
Feb 01/11

Subtask 27-44-51-860-065
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.
(2) Depressurize the Green and Yellow hydraulic systems and put them in
the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Depressurize the reservoirs of the Green and Yellow hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
R

(5) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the Green, the Yellow and the Blue hydraulic systems:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
Subtask 27-44-51-865-063
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51



AIJ




Page 464
Nov 01/10

4. Procedure
_________
R

(Ref. Fig. 412/TASK 27-44-51-991-020)


Subtask 27-44-51-020-054
A. Removal of the Filter
(1) Put a CONTAINER 3 L(3/4 USGAL) under the filter assembly (1).
(2) Remove the filter (3) from the filter assembly (1).
(3) Remove and discard the packing (2).
Subtask 27-44-51-560-051
B. Preparation for Installation
(1) Clean the filter with the CLEANING AGENTS (Material No. 11-002) and a
MISCELLANEOUS (Material No. 19-003).
(2) Do a visual inspection of the filter (3).
(3) Apply the COMMON GREASE (Material No. 04-015) to the new packing (2).
(4) Install the packing (2) on the filter (3).
Subtask 27-44-51-420-054
C. Installation of the Filter at the Valve Block
(1) Put the filter (3) with the packing (2) in position.
(2) Install the filter (3) and the packing (2) in the filter assembly
(1).
(3) TORQUE the filter (3) to between 2.1 and 2.3 m.daN (15.48 and 16.96
lbf.ft).
(4) Remove the CONTAINER 3 L(3/4 USGAL).
Subtask 27-44-51-865-064
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.



EFF :
ALL
 27-44-51



AIJ




Page 465
May 01/07

Replacement of the Filter


Figure 412/TASK 27-44-51-991-020



EFF :
ALL
 27-44-51



AIJ




Page 466
May 01/07

Subtask 27-44-51-720-051
E. Test
(1) Make sure that the THS actuator has the correct quantity of oil and
fill as necessary (Ref. TASK 27-44-51-210-004).
(2) Do a system test of the THS control (Ref. TASK 27-41-00-720-001).
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(3) Do a visual check of the THS actuator and make sure that there is no
leakage from:
- The hydraulic connections
- The oil filler-plug connection
- The oil drain-plug connection
- The body of the THS actuator.
5. Close-up
________
Subtask 27-44-51-410-064
A. Close Access
(1) Remove the warning notices.
(2) Make sure that the work area is clean and clear of tools and other
items.
(3) Close the access door 312AR.
(4) Remove the access platform.



EFF :
ALL
 27-44-51



AIJ




Page 467
May 01/07

ACTUATOR - THS (9CE) - ADJUSTMENT/TEST


______________________________________
TASK 27-44-51-710-001
Operational Test of the No-Back Device (No-Back Pawls)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274400-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

No specific
0U145506
0U190844

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 CONE - MOUNTING, THS ACTUATOR
1 TOOL-RELEASE,POB



EFF :
ALL
 27-44-51



AIJ




Page 501
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
Material No. 19-018

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS ST L OR NICKEL ALLOY
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4

O-ring

27-44-51 02 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-991-011

Fig. 501

3. __________
Job Set-up
Subtask 27-44-51-010-058
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.



EFF :
ALL
 27-44-51



AIJ




Page 502
Feb 01/11

Subtask 27-44-51-865-052
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
4. Procedure
_________
(Ref. Fig. 501/TASK 27-44-51-991-011)
Subtask 27-44-51-710-050
A. Operational Test
(1) Cut, remove and discard the lockwire at the plug (3) of the manual
drive input.
(2) Remove the plug (3) from the manual drive input of the THS actuator
(1).
(3) Remove and discard the O-ring (4) from the plug (3).
R
R

(4) Install the TOOL-RELEASE,POB on the control piston (2) of one of the
two pressure-off brakes as follows:
(a) Install the shaft on the thread of the control piston (2).
(b) Put the collar in position on the shaft and install the command
nut.
(c) Make sure that the collar has contact with the housing and there
is a gap between the spring pin and the collar.
(d) Make sure that the command nut has contact with the collar.
(e) TORQUE the command nut to between 0.35 and 0.50 m.daN (30.97 and
44.24 lbf.in) (agrees with half a turn of the command nut) to
release the pressure-off brake.
(5) Put a socket wrench in position at the manual drive input.



EFF :
ALL
 27-44-51



AIJ




Page 503
Nov 01/10

R
R
R

Location of the Manual Drive Input and the Installation of the Release Tool of
the Pressure-Off Brake
Figure 501/TASK 27-44-51-991-011

EFF :
ALL

Page 504


Feb 01/07


AIJ




27-44-51

(6) Use the socket wrench to turn the manual drive input (a maximum of
half a revolution), very slowly, in one direction and then in the
other direction.
NOTE : Listen for the operation noise of the ratchet wheels, (a
____
tic-tac noise), while the manual drive input turns.
NOTE : When you turn the manual drive input in the clockwise or
____
counter- clockwise directions, an intermitted resistance to
the movement can occur, due to compression of hydraulic fluid
in the hydraulic motors.
R

(7) Remove the TOOL-RELEASE,POB (0U190844) from the control piston (2).
(8) Remove the socket wrench from the manual drive input.
(9) Apply COMMON GREASE (Material No. 04-015) to the new O-ring (4).
(10) Use the CONE - MOUNTING, THS ACTUATOR (0U145506) and put the O-ring
(4) on the plug (3).
(11) Install the plug (3) in the manual drive input.
(12) TORQUE the plug (3) to between 1.4 and 1.6 m.daN (10.32 and 11.79
lbf.ft).
(13) Safety the plug (3) with lockwire MISCELLANEOUS (Material No. 19018).
5. Close-up
________
Subtask 27-44-51-865-053
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.
Subtask 27-44-51-410-058
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).



EFF :
ALL
 27-44-51



AIJ




Page 505
Nov 01/10

(4) Remove the access platform(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 506
Nov 01/08

ACTUATOR - THS (9CE) - INSPECTION/CHECK


_______________________________________
TASK 27-44-51-210-001
Visual Inspection of the THS-Actuator
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
To make sure that the external area of the THS-actuator is in a correct
condition.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

flashlight
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE



EFF :
ALL
 27-44-51



AIJ




Page 601
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-002

USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-210-004
27-44-51-991-007

Check the Oil Level of the Gearbox of the


THS-Actuator
Fig. 601

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-44-51-991-007)
Subtask 27-44-51-010-052
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.



EFF :
ALL
 27-44-51



AIJ




Page 602
Feb 01/11

R
R

THS Actuator 9CE


Figure 601/TASK 27-44-51-991-007



EFF :
ALL
 27-44-51



AIJ




Page 603
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-44-51-991-007)


Subtask 27-44-51-210-054
A. Examine the casing (1) of the THS actuator
(1) Clean the casing (1) with CLEANING AGENTS (Material No. 11-002) and
let it dry.
(2) Use a flashlight and examine the casing (1) for:
- cracks,
- dents,
- corrosion,
- signs of leakage,
- satisfactory protective finish.
(3) Make sure that the line replaceable units (LRU) are correctly
installed on the casing (1).
(4) Make sure that the THS actuator has the correct quantity of oil
(Ref. TASK 27-44-51-210-004).
5. Close-up
________
Subtask 27-44-51-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).



EFF :
ALL
 27-44-51



AIJ




Page 604
Feb 01/07

TASK 27-44-51-220-001
Detailed Visual Inspection of the the Ball-Screw Nut Body, the Screw and the
Claw Stops of the THS-Actuator
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-04
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 FLASHLIGHT

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-002

USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 605
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-22-27-640-003
27-44-51-991-007
27-44-51-991-008

Lubrication of Trimmable Horizontal Stabilizer


Actuator Ball Screw Nut
Fig. 601
Fig. 602

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-44-51-991-007, 602/TASK 27-44-51-991-008)
Subtask 27-44-51-010-053
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
4. Procedure
_________
(Ref. Fig. 601/TASK 27-44-51-991-007, 602/TASK 27-44-51-991-008)
Subtask 27-44-51-220-050
A. Inspection
(1) Carefully examine the ball screw nut (5), the ball screw (7) and the
claw stops (4).
(2) Clean the items that follow with the CLEANING AGENTS (Material No.
11-002):
- The claw stops (4)
- The ball screw nut (5)
- The ball screw (7)
- The nut assembly (8).



EFF :
ALL
 27-44-51



AIJ




Page 606
Feb 01/11

R
R

Claw Stops, Ball Screw Nut and Screw


Figure 602/TASK 27-44-51-991-008



EFF :
ALL
 27-44-51



AIJ




Page 607
Feb 01/07

(3) Use a FLASHLIGHT and inspect the claw stops (4) for:
- Cracks
- Dents.
R
R

NOTE : In Vendor Service Bulletin 47145-27-15 you will find more


____
information concerning claw stop damage.
(4) Make sure that the claw stops (4) are correctly installed on the
screw (7):
(a) Make sure that the screws (15) are correctly installed through
the keys (18) in the claw stops (4).
(b) Make sure that the flange (16) is correctly installed on the claw
stop (4) and shows no damage.
(c) Make sure that the tab washer (19) is correctly safetied on the
special nut (20) at the lower claw stop (4).
(5) Use the FLASHLIGHT and examine the ball screw nut (5) for:
- Cracks
- Dents
- Corrosion
- Satisfactory surface protection.
(6) Make sure that the ball screw nut (5) is correctly installed in the
nut assembly (8):
(a) Make sure that the grease nipple (17):
- Is clean
- Shows no damage
- Is correctly installed in the fail-safe nut (23).
(b) Make sure that the ice chippers (21) and (24):
- Show no damage
- Are correctly installed on the ball screw (7).
(c) Make sure that the locking bush (22):
- Shows no damage
- Is correctly installed on the ball screw nut (5).
(7) Use a FLASHLIGHT and examine the ball screw (7) for:
- Cracks
- Corrosion
- Satisfactory surface protection.
(a) If you find shiny marks on the ball screw (7), do not replace the
THSA as these marks are permitted. Refer to the Goodrich SB for
more data (Ref. SB 47145-27-10).



EFF :
ALL
 27-44-51



AIJ




Page 608
May 01/11

(8) Use a FLASHLIGHT and inspect the nut assembly (8) for:
- Cracks
- Corrosion
- Satisfactory surface protection.
(9) Lubricate the ball screw nut (5) as necessary (Ref. TASK 12-22-27640-003).
5. Close-up
________
Subtask 27-44-51-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 609
Aug 01/08

TASK 27-44-51-210-002
Visual Check of the Threaded (Fail-Safe) Nut
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-06
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 FLASHLIGHT

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-991-007
27-44-51-991-008

Fig. 601
Fig. 602

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-44-51-991-007)
Subtask 27-44-51-010-054
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 610
Feb 01/11

(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
4. Procedure
_________
R

(Ref. Fig. 602/TASK 27-44-51-991-008)


Subtask 27-44-51-210-055
A. Do a visual check of the threaded (fail-safe) nut
(1) Use a FLASHLIGHT and do a visual check of the fail-safe nut (23) from
the upper side of the nut assembly (8) for:
- cracks,
- corrosion,
- damage.
5. Close-up
________
Subtask 27-44-51-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-51



AIJ




Page 611
Feb 01/07

TASK 27-44-51-210-003
Check the Indicator of the No-Back Wear Detection-Device of the THS-Actuator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-03
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

flashlight
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-000-001
27-44-51-400-001
27-44-51-991-007
27-44-51-991-009

Removal of the Trimmable Horizontal Stabilizer (THS)


Actuator (9CE)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE)
Fig. 601
Fig. 603



EFF :
ALL
 27-44-51



AIJ




Page 612
Feb 01/11

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-44-51-991-007)
Subtask 27-44-51-010-055
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
4. Procedure
_________
(Ref. Fig. 603/TASK 27-44-51-991-009)
Subtask 27-44-51-210-056
A. Examine the indicator of the detection device.
(1) Use a flashlight and examine the detection device (30).
(a) Make sure that the red pop-out (31) is not released.
(b) If the red pop-out (31) is released, examine the position of the
roller (32) on the detection device (30)
(Ref. Fig. 603/TASK 27-44-51-991-009)
1
_

If the roller (32) is in the position TRIPPED BY VIBRATION,


reset the red pop-out (31):
- Push the roller (32) with a tool, for example a small
screwdriver, in the reset position.

2
_

If the roller (32) is in the position TRIPPED BECAUSE OF NO


BACK WEAR, replace the THS-Actuator (Ref. TASK 27-44-51-000001) and (Ref. TASK 27-44-51-400-001).



EFF :
ALL
 27-44-51



AIJ




Page 613
Feb 01/11

R
R

Detection Device - Actuator No-Back Wear


Figure 603/TASK 27-44-51-991-009



EFF :
ALL
 27-44-51



AIJ




Page 614
Feb 01/07

5. Close-up
________
Subtask 27-44-51-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 615
Feb 01/07

TASK 27-44-51-280-001
Check the Integrity of the Ball Screw Shaft (Primary and Secondary Load Paths)
of the THS-Actuator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-08
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
0U191191

warning notices
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
WRENCH - STANDARD
WRENCH - TORQUE
CHECKING TOOL - BALL SCREW AND TIE BAR

1
1
1
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 616
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-000-001
27-44-51-400-001
29-00-00-864-001
27-44-51-991-010

Removal of the Trimmable Horizontal Stabilizer (THS)


Actuator (9CE)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 604

3. __________
Job Set-up
Subtask 27-44-51-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the Yellow hydraulic system is depressurized and put
it in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
(4) Put the warning notices in position to tell persons not to pressurize
the Green and Yellow hydraulic systems:
- in the cockpit on the hydraulic section 40VU on the overhead panel,
- on the ground service panels of the Green and Yellow hydraulic
systems.
Subtask 27-44-51-010-056
B. Get Access
(1) Open the access door 312AR.
R

(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.



EFF :
ALL
 27-44-51



AIJ




Page 617
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 604/TASK 27-44-51-991-010)


Subtask 27-44-51-280-050
A. Do an integrity check of the ball screw shaft (primary and secondary load
paths).

R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.

R
R

(1) Remove and discard the lockwire (2) from the screws (1). Do not
loosen the screws (1).

R
R

NOTE : The removal of the lockwire (2) is necessary to get a better


____
access to the machined area of the lower claw stop.

R
R
R

(2) Put the larger clamp of the CHECKING TOOL - BALL SCREW AND TIE BAR
(0U191191) in position on the lower claw stop (with the graded scale
in the up direction).

(3) Tighten the clamping nut.

(4) Put the smaller clamp of the CHECKING TOOL - BALL SCREW AND TIE BAR
in position on the tie bar nut.

(5) Put the needle in the zero position of the graded scale and tighten
the clamping nut.

(6) Put a WRENCH - TORQUE on the hexagonal end of the tie bar (secondary
load path).

(7) Put a WRENCH - STANDARD on the machined area of the lower claw stop
(primary load path).

R
R

(8) Hold the upper wrench in position and apply a TORQUE of 10 m.daN
(73.74 lbf.ft) clockwise to the WRENCH - TORQUE.

(9) Look at the graded scale of the CHECKING TOOL - BALL SCREW AND TIE
BAR.

(10) Make sure that the rotation is not more than 10 degrees.

R
R

(11) Do the above check procedure counterclockwise.



EFF :
ALL
 27-44-51



AIJ




Page 618
Feb 01/07

R
R

Ball Screw Shaft - Integrity Check


Figure 604/TASK 27-44-51-991-010



EFF :
ALL
 27-44-51



AIJ




Page 619
Feb 01/07

R
R

(12) If the rotation is more than 10 degrees, replace the THS actuator 9CE
(Ref. TASK 27-44-51-000-001) and (Ref. TASK 27-44-51-400-001)

(13) Release the torque and remove the wrenches.

(14) Remove the CHECKING TOOL - BALL SCREW AND TIE BAR (0U191191) from the
lower claw stop and the tie bar nut.

R
R

(15) Safety the screws (1) with the lockwire 0.8 mm (0.0314 in.)
MISCELLANEOUS (Material No. 19-010).
5. Close-up
________
Subtask 27-44-51-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-51



AIJ




Page 620
Feb 01/07

TASK 27-44-51-220-002
Detailed Visual Inspection of the Upper and the Lower Attachments (Primary and
Secondary) of the THS-Actuator
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-05
NOTE : Do not clean the attachments before you do the inspection given in
____
the Airbus Inspection Service Bulletin 27-1164 if the AMM task and
the SB are being done together.

R
R

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

flashlight
warning notices
access platform 5.5 m (18 ft. 1 in.)



EFF :
ALL
 27-44-51



AIJ




Page 621
Feb 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-002

USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-44-51-991-007

Fig. 601

3. __________
Job Set-up
R

(Ref. Fig. 601/TASK 27-44-51-991-007)


Subtask 27-44-51-941-068
A. Aircraft Maintenance Configuration
(1) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
(2) Put the access platform in position.
Subtask 27-44-51-010-057
B. Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 622
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-44-51-991-007)


Subtask 27-44-51-220-051
A. Carefully examine the upper attachments (2),(3) and the lower attachments
(6) of the THS actuator 9CE.
(1) Clean:
- the primary upper attachments (2),
- the secondary upper attachments (3),
- the primary lower attachments (6),
- the secondary lower attachments at the nut assembly (8)
with CLEANING AGENTS (Material No. 11-002) and let them dry.
(2) Use a flashlight and examine the primary upper attachments (2) for:
- cracks,
- dents,
- corrosion,
- protective finish,
- correct attachment.
(3) Use a flashlight and examine the secondary upper attachments (3) for:
- cracks,
- dents,
- corrosion,
- protective finish,
- correct attachment.
(4) Use a flashlight and examine the primary lower attachments (6) for:
- cracks,
- dents,
- corrosion,
- protective finish,
- correct attachment.
(5) Use a flashlight and examine the secondary lower attachments at the
nut assembly (8) for:
- cracks,
- corrosion,
- protective finish,
- correct attachment.



EFF :
ALL
 27-44-51



AIJ




Page 623
Feb 01/07

5. Close-up
________
Subtask 27-44-51-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
Subtask 27-44-51-942-067
B. Put the aircraft back to the serviceable condition.
(1) Remove the access platform(s).
(2) Remove the warning notice(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 624
Feb 01/07

TASK 27-44-51-210-004
Check the Oil Level of the Gearbox of the THS-Actuator
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

1 ACCESS PLATFORM 5M (16 FT)


1 WARNING NOTICE(S)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 625
Nov 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-13-27-612-001
27-44-51-000-001
27-44-51-400-001
27-44-56-000-001
27-44-56-400-001
27-44-57-000-001
27-44-57-400-001
29-00-00-864-001
29-23-00-863-001
29-23-00-863-002
R

27-44-51-991-012-A

Oil Replenishment of the THS Actuator (9CE)


Removal of the Trimmable Horizontal Stabilizer (THS)
Actuator (9CE)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE)
Removal of the Position Transducer from the THS
Actuator 9CE
Installation of the Position Transducer to the THS
Actuator 9CE
Removal of the Pitch Trim Actuator from the THS
Actuator 9CE
Installation of the Pitch Trim Actuator to the THS
Actuator 9CE
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Fig. 605

3. __________
Job Set-up
Subtask 27-44-51-941-072
A. Aircraft Maintenance Configuration
(1) Put the WARNING NOTICE(S) in the flight compartment to tell persons
not to operate the pitch controls.
(2) Put the ACCESS PLATFORM 5M (16 FT) in position.
Subtask 27-44-51-010-059
B. Get Access
(1) Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 626
Aug 01/11

4. Procedure
_________
R

(Ref. Fig. 605/TASK 27-44-51-991-012-A)


Subtask 27-44-51-860-067
A. Preparation for the Check of the Oil Level of the THS-Actuator Gearbox
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2923-00-863-001) and (Ref. TASK 29-23-00-863-002).
(2) For the correct check of the oil level it is necessary to do the
steps that follow:
(a) Turn the pitch-trim control wheel in the flight compartment and
move the THS-actuator a minimum of:
- Three times from the fully UP position to the fully DOWN
position.
(b) Turn the pitch-trim control wheel in the flight compartment and
move the THS-actuator to the zero position.
(3) Depressurize the Green and Yellow hydraulic systems and put them in
the maintenance configuration (Ref. TASK 29-00-00-864-001).
(4) Put the WARNING NOTICE(S) in position to tell persons not to
pressurize the Green, the Yellow and the Blue hydraulic systems:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panels of the Green, the Yellow and the Blue
hydraulic systems.
(5) On the fuselage tail cone, make sure that the THS is opposite the 0
mark.
(6) Make sure that the aircraft is in a horizontal position.
(7) Clean the sight glass (41) and the adjacent area with the CLEANING
AGENTS (Material No. 11-026) and let it dry.



EFF :
ALL
 27-44-51



AIJ




Page 627
Aug 01/11

R
R

THS Actuator 9CE - Gearbox Oil-Sight-Level


Figure 605/TASK 27-44-51-991-012-A



EFF :
ALL
 27-44-51



AIJ




Page 628
Aug 01/11

Subtask 27-44-51-210-057
B. Do a Check of the Oil Level of the THS-Actuator Gearbox
(1) Do a check of the oil level at the oil sight glass (40) at
approximately one hour after:
- The last movement of the THS-actuator.

R
R
R

NOTE : Carbon dust from the carbon discs can make the oil black in
____
color.
NOTE : The oil sight glass (40) minimum level mark can show a MINI
____
mark or a 90cc mark.
(2) If the oil level is between the minimum mark and the maximum mark,
fill the gearbox to the maximum mark (Ref. TASK 12-13-27-612-001).
(a) If the actuator housing temperature is less than 10 deg.C (50.00
deg.F), we recommend that:
- You fill the gearbox to a level of 1.5 mm (0.0590 in.) less
than the maximum mark.
(b) If the actuator housing temperature is more than 30 deg.C (86.00
deg.F), we recommend that:
- You fill the gearbox to a level of 1.5 mm (0.0590 in.) more
than the maximum mark.
(c) Do the close-up procedure (refer to Para. 5.).
(3) If the oil level is below the minimum mark, do a check for an
external oil leak of the gearbox.
(a) If you find an external oil leak, replace the THS-actuator
(Ref. TASK 27-44-51-000-001) and (Ref. TASK 27-44-51-400-001).
(b) If you do not find an external oil leak, fill the gearbox to the
maximum level (Ref. TASK 12-13-27-612-001). Measure and record
the quantity of oil that you add to the gearbox.
1
_

If the actuator housing temperature is less than 10 deg.C


(50.00 deg.F), we recommend that:
- You fill the gearbox to a level of 1.5 mm (0.0590 in.) less
than the maximum mark.

2
_

If the actuator housing temperature is more than 30 deg.C


(86.00 deg.F), we recommend that:



EFF :
ALL
 27-44-51



AIJ




Page 629
May 01/10

- You fill the gearbox to a level of 1.5 mm (0.0590 in.) more


than the maximum mark.
3
_

If the added oil quantity is less than 90 cm3 (5.49 in.3), no


more checks are necessary.
NOTE : If the oil level is recorded between MIN and MAX mark
____
during reduced AMM inspection interval, do the next
check again according to current MPD interval.

4
_

If the added oil quantity is more than 440 cm3 (26.84 in.3),
replace the THS-actuator (Ref. TASK 27-44-51-000-001) and
(Ref. TASK 27-44-51-400-001).

5
_

If the added oil quantity is more than 90 cm3 (5.49 in.3) but
less than 440 cm3 (26.84 in.3):
a
_

Remove the position transducers (Ref. TASK 27-44-56-000001).

b
_

Do a check for signs of oil.

6
_

If you find oil:


- Replace the THS-actuator (Ref. TASK 27-44-51-000-001) and
(Ref. TASK 27-44-51-400-001).

7
_

If you do not find oil:


- Install the position transducers (Ref. TASK 27-44-56-400001)
- Remove the pitch trim actuator (Ref. TASK 27-44-57-000-001).

8
_

Do a check for signs of oil.


a
_

9
_

If you find oil:


- Replace the THS-actuator (Ref. TASK 27-44-51-000-001) and
(Ref. TASK 27-44-51-400-001).

If you do not find oil:


a
_

Install the pitch trim actuator (Ref. TASK 27-44-57-400001).

b
_

Replace the THS-actuator in


- Less than 600FH, or
- Less than 750FC, or
- Less than 100 days (Ref. TASK 27-44-51-000-001) and
(Ref. TASK 27-44-51-400-001).



EFF :
ALL
 27-44-51


R 
AIJ




Page 630
May 01/10

Do the replacement in the limits that come first.


c
_

During the time before a THS-actuator is replaced, you must


do checks of the oil level in the gearbox at intervals.
Refer to the table below for the intervals between the
checks for a given quantity of added oil.

------------------------------------------------------------------------------|
Quantity of added oil
|
Intervals between oil
|
|
|
level checks
|
------------------------------------------------------------------------------|
90 to 180 cm3 (5.50 to 11.00 in.3)
|
(or 150 flight hours) |
|-----------------------------------------------|-----------------------------|
|
180 to 440 cm3 (11.00 to 26.80 in.3)
|
Daily Check
|
------------------------------------------------------------------------------5. Close-up
________
Subtask 27-44-51-410-059
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
Subtask 27-44-51-942-070
B. Put the aircraft back to the serviceable condition.
(1) Remove the warning notice(s).
(2) Remove the access platform(s).



EFF :
ALL
 27-44-51



AIJ




Page 631
Nov 01/10

TASK 27-44-51-200-001
Check the Backlash between the Ball Screw Nut and Screw of the THS-Actuator
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-07
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
0U190863

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 BACKLASH CHECKING TOOL - THS ACTUATOR



EFF :
ALL
 27-44-51



AIJ




Page 632
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 11-002
Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-22-27-640-003
29-00-00-864-001
27-44-51-991-013

Lubrication of Trimmable Horizontal Stabilizer


Actuator Ball Screw Nut
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 606

3. __________
Job Set-up
(Ref. Fig. 606/TASK 27-44-51-991-013)
Subtask 27-44-51-010-060
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position below the
access door 312AR.
(2) Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 633
Feb 01/11

R
R

THS Actuator Backlash Check


Figure 606/TASK 27-44-51-991-013



EFF :
ALL
 27-44-51



AIJ




Page 634
Feb 01/07

Subtask 27-44-51-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the actuator for the Trimmable Horizontal Stabilizer
is in the 0 degree position.
(2) Make sure that the Green hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Make sure that the Yellow hydraulic system is depressurized and put
it in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Put warning notices on the ground service panels of the Green and
Yellow hydraulic systems to tell persons not to pressurize the Green
and Yellow hydraulic systems.
(5) Put warning notices in the cockpit to tell persons not to operate the
pitch controls.
Subtask 27-44-51-865-055
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-51-480-051
D. Install the BACKLASH CHECKING TOOL - THS ACTUATOR (0U190863):
(1) Clean the screwshaft with a lint-free cloth MISCELLANEOUS (Material
No. 19-003) and CLEANING AGENTS (Material No. 11-002) and let it dry.
(2) Install the mechanical stop unit, part of the BACKLASH CHECKING TOOLTHS ACTUATOR, on the top side of the ballnut with the screws (1).



EFF :
ALL
 27-44-51


R 
AIJ




Page 635
Feb 01/07

(3) Make sure, that the cams of the mechanical stop unit engage with the
cams of the ballnut.
(4) Make sure, that the mechanical stop unit does not touch the thread of
the screw shaft.
(5) Install the clamp and the lever assembly, parts of the BACKLASH
CHECKING TOOL - THS ACTUATOR, on the top side of the mechanical stop
unit to the thread of the screw shaft.
(6) Install the dial indicator part of the BACKLASH CHECKING TOOL - THS
ACTUATOR on the screwshaft below the ballnut.
(7) Set the dial indicator to zero.
4. Procedure
_________
(Ref. Fig. 606/TASK 27-44-51-991-013)
Subtask 27-44-51-220-052
A. Check of the Backlash
(1) Apply a force of 12 daN (27.0 lbf.) vertically (parallel to the screw
shaft of the THS actuator) at the application hole of the lever assy
of the BACKLASH CHECKING TOOL - THS ACTUATOR. Make sure that the
application hole is 385 mm (15.1574 in.) away from the edge of the
fitting fork.
(2) Use the dial indicator and make sure that the backlash is not more
than 0.15 mm (0.0059 in.).

5. Close-up
________
Subtask 27-44-51-080-051
A. Remove the BACKLASH CHECKING TOOL - THS ACTUATOR.
Subtask 27-44-51-640-050
B. Apply a small quantity of COMMON GREASE (Material No. 04-004) to the
screwshaft and lubricate the ball screw nut as necessary (Ref. TASK 1222-27-640-003).



EFF :
ALL
 27-44-51



AIJ




Page 636
Nov 01/10

Subtask 27-44-51-410-061
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
Subtask 27-44-51-865-056
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.



EFF :
ALL
 27-44-51


R 
AIJ




Page 637
Feb 01/07

TASK 27-44-51-200-002
Inspection of the Magnetic Chip Detector and Boroscope Inspection of the Power
Gear of the THS-Actuator
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific

0U190364
0U190844

warning notices
ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
BORESCOPE - FLEXIBLE
CONTAINER 4 L (1 USGAL)
HOSE - DRAIN
PAPER - FILTER
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 TOOL - DRAIN, THSA
2 TOOL-RELEASE,POB
1
1
1
1
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 19-003

lockwire, corrosion-resistant steel, 0.6 mm (0.024


in.)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-44-51



AIJ




Page 638
May 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2
4

O-rings
O-ring

27-44-51 02 -060
27-44-51 02 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-13-27-612-001
27-41-00-730-001
27-44-51-000-001
27-44-51-400-001
27-44-51-710-001
29-00-00-864-001
27-44-51-991-015

Oil Replenishment of the THS Actuator (9CE)


System Test of the THS Actuator Electrical Control
Removal of the Trimmable Horizontal Stabilizer (THS)
Actuator (9CE)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE)
Operational Test of the No-Back Device (No-Back
Pawls)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 607

3. __________
Job Set-up
Subtask 27-44-51-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the Yellow hydraulic system is depressurized and put
it in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Put warning notices in position to tell persons not to pressurize the
Green and Yellow hydraulic systems:
- in the cockpit on the hydraulic section 40VU on the overhead panel,
- on the ground service panels of the Green and Yellow hydraulic
systems.



EFF :
ALL
 27-44-51


R 
AIJ




Page 639
May 01/11

(4) Put warning notices in the cockpit to tell persons not to operate the
pitch controls.
Subtask 27-44-51-010-061
B. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position at the
access door 312AR.
(2) Open the access door 312AR.
4. Procedure
_________
(Ref. Fig. 607/TASK 27-44-51-991-015)
Subtask 27-44-51-210-058
A. Do an Inspection of the Magnetic Chip Detector
(1) Disconnect the drain plug (5) from the actuator housing.
(2) Examine the magnetic chip detector for metal particles.
(3) If you find metal particles which are larger than 2 mm (0.0787 in.)
by 1 mm (0.0393 in.), do a boroscope inspection as written below.
(4) If you do not find metal particles larger than given above, continue
as follows:
(a) Clean the magnetic chip detector with a MISCELLANEOUS (Material
No. 19-003).
(b) Connect the drain plug (5) to the actuator housing.
Subtask 27-44-51-290-050
B. Do a Boroscope Inspection of the Power Gears
(1) Put a CONTAINER 4 L (1 USGAL) below the connection of the drain plug
to collect the drained oil.
R

(2) Connect the TOOL - DRAIN, THSA to the opening of the drain plug.

R
R

(3) Use a HOSE - DRAIN and drain the oil from the gearbox through a PAPER
- FILTER into the container.



EFF :
ALL
 27-44-51



AIJ




Page 640
May 01/11

R
R
R

Inspection of the Magnetic Detector and Boroscope Inspection of the


THS-Actuator
Figure 607/TASK 27-44-51-991-015

EFF :
ALL

Page 641


Feb 01/07


AIJ




27-44-51

(4) Examine the paper filter for metal particles.


(5) Disconnect the TOOL - DRAIN, THSA and the flexible tube from the
opening of the drain plug.
(6) Remove the container with the drained oil.
(7) Cut the lockwire and remove the inspection plugs (1) with the O-ring
(2).
(8) Cut the lockwire and remove the plug (3) with the O-ring (4).
(9) Discard the O-rings (2),(4).
R

(10) Install the TOOL-RELEASE,POB (Ref. TASK 27-44-51-710-001).

(11) Put an BORESCOPE - FLEXIBLE into the inspection holes of the gearbox
and examine the teeth of the power gears.
(12) Put a socket wrench in the opening of the manual drive input.
(13) Use the socket wrench and turn the manual drive input.
(14) Examine the teeth of the power gear while you turn the manual drive
input.
NOTE : Do the inspection thru both inspection holes.
____
(15) Turn the manual drive input to the zero position.
(16) If you find chipped gear teeth, replace the THS-actuator (Ref. TASK
27-44-51-000-001) and (Ref. TASK 27-44-51-400-001).
NOTE : Do not clean the magnetic chip detectors. They may be the
____
basis of a subsequent analysis.
(17) If you have not found defects of the gear teeth, continue as follows:
(a) Connect the drain plug (5).
(b) Install the inspection plugs (1) with the new O-rings (2).
(c) TORQUE the plug (1) to 2 m.daN (14.74 lbf.ft) and safety it with
lockwire, corrosion-resistant steel, 0.6 mm (0.024 in.)
(d) Install the plug (3) with the new O-ring (4).



EFF :
ALL
 27-44-51



AIJ




Page 642
May 01/11

(e) TORQUE the plug (3) to between 1.4 and 1.6 m.daN (10.32 and 11.79
lbf.ft) and safety it with lockwire, corrosion-resistant steel,
0.6 mm (0.024 in.)
(f) Remove the TOOL-RELEASE,POB (Ref. TASK 27-44-51-710-001).
(g) Fill the THS-actuator with oil (Ref. TASK 12-13-27-612-001).
(h) Do the system test of the THS-mechanical control (Ref. TASK 2741-00-730-001).
(i) If the system test shows a defect, replace the THS-actuator
(Ref. TASK 27-44-51-000-001) and (Ref. TASK 27-44-51-400-001).
5. Close-up
________
Subtask 27-44-51-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).



EFF :
ALL
 27-44-51


R 
AIJ




Page 643
May 01/11

TASK 27-44-51-610-001
Drain and Refill the Trimable Horizontal Stabilizer Actuator Gearbox
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-09
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notices

R
R

No specific
No specific
0U190364

access platform 5.5 m (18 ft. 1 in.)


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 TOOL - DRAIN, THSA



EFF :
ALL
 27-44-51



AIJ




Page 644
May 01/11

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R

12-13-27-612-001
24-41-00-861-002

3. __________
Job Set-up

Subtask 27-44-51-865-060

24-41-00-862-002
29-00-00-864-001
29-23-00-863-001
29-23-00-864-001
27-44-51-991-017

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Oil Replenishment of the THS Actuator (9CE)


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Fig. 608

A. Make sure that this(these) circuit breaker(s) is(are) closed:


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-44-51



AIJ




Page 645
Feb 01/11

Subtask 27-44-51-860-061

B. Aircraft Maintenance Configuration

R
R

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.

R
R

(2) Pressurize the Yellow and the Green hydraulic systems (Ref. TASK 2923-00-863-001).

(3) On the center pedestal:

(a) Turn the pitch-trim control wheel to the nose DN stop position.

(b) Turn the pitch-trim control wheel to the nose UP stop position.

(c) Do the steps (3) (a) and (b) again.

(d) Turn the pitch-trim control wheel to the 0 position.

R
R

(4) Depressurize the Green and Yellow hydraulic systems.


(Ref. TASK 29-23-00-864-001).

R
R
R

(5) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).

R
R

(6) De-energize the aircraft electrical circuits


(Ref. TASK 24-41-00-862-002).

R
R
R
R
R

(7) Put warning notices in position to tell persons not to pressurize the
Green and Yellow hydraulic systems:
- in the cockpit on the hydraulic section 40VU on the overhead panel,
- on the ground service panels of the Green and Yellow hydraulic
systems.

R
R

(8) Put warning notices in the cockpit to tell persons not to operate the
pitch controls.

(9) Put the access platform in position at the access door 312AR.

(10) Open the access door 312AR.



EFF :
ALL
 27-44-51



AIJ




Page 646
Feb 01/11

4. Procedure
_________
(Ref. Fig. 608/TASK 27-44-51-991-017)
Subtask 27-44-51-610-050
A. Drain and Refill the Trimable Horizontal Stabilizer Actuator Gearbox
R

(1) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the THS
actuator (1).
(2) Remove the oil drain plug (2) from the oil drain fitting (3).

(3) Remove the oil filler plug (4) from the oil filler fitting (5).

(4) Install the TOOL - DRAIN, THSA on the oil drain fitting (3).

(5) Drain the oil from the THS actuator (1) into the drainage container.

(6) Remove the TOOL - DRAIN, THSA.

(7) Install the oil drain plug (2) on the oil drain fitting (3).

(8) Install the oil filler plug (4) on the oil filler fitting (5).

(9) Remove the drainage container.

(10) Fill the THS actuator (1) with the correct oil to the correct level
(Ref. TASK 12-13-27-612-001).

(11) Do a visual check of the THS actuator (1) and make sure that there
are no leaks from:
- The oil filler plug and adaptor,
- the oil drain plug.
5. Close-up
________
Subtask 27-44-51-860-062
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).



EFF :
ALL
 27-44-51



AIJ




Page 647
May 01/11

Drainage and Refilling of the Trimable Horizontal Stabilizer Actuator Gearbox


Figure 608/TASK 27-44-51-991-017



EFF :
ALL
 27-44-51



AIJ




Page 648
Aug 01/11

TASK 27-44-51-220-003
Detailed Inspection of THSA Lower Attachments for Secondary Load Path Loading
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-10
NOTE : Do this inspection before MPD-Task 274451-05-1 (if planned at the
____
same time).
Do not clean the attachments before you do this inspection.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
0U190360
98D27403500000

1
1
1
1
2

circuit breaker(s) safety clip(s)


structural protection material
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
GAGE - FEELER
WARNING NOTICE(S)
PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
PITCH TRIM CONTROL LOCKING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-44-51


R 
AIJ




Page 649
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-080-001
27-00-00-480-001
27-40-00-040-001
27-44-51-000-001
27-44-51-400-001

29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
27-44-51-991-018

Removal of the Pitch-Trim Control Locking Tool


(98D27403500000)
Installation of the Pitch-Trim Control Locking Tool
(98D27403500000)
Check of the synchronization between pitch trim
handwheel and stabilizer
Removal of the Trimmable Horizontal Stabilizer (THS)
Actuator (9CE)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 609

3. __________
Job Set-up
Subtask 27-44-51-860-063
A. Aircraft Maintenance Configuration
(1) Put the THSA in the 0 degree position (Ref. TASK 27-40-00-040-001).
(2) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-10-00-864-002) and (Ref. TASK 29-1000-864-003).
(3) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
(4) On the flight-compartment overhead-panel, on the hydraulic section
42VU:
- Put a WARNING NOTICE(S) in position to tell persons not to
pressurize the Green, Yellow and Blue hydraulic systems.
(5) On the ground service panels of the Green, Yellow and Blue hydraulic
systems:
- Put a WARNING NOTICE(S) in position to tell persons not to
pressurize the hydraulic systems.



EFF :
ALL
 27-44-51



AIJ




Page 650
Feb 01/11

(6) Put the PITCH TRIM CONTROL LOCKING on the pitch-trim control-wheel in
the flight compartment (Ref. TASK 27-00-00-480-001).
(7) Put a WARNING NOTICE(S) in the flight compartment to tell persons not
to operate the pitch controls.
(8) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator.
(9) Put the structural protection material in the area of the THS
actuator to prevent damage to the structure.
Subtask 27-44-51-865-061
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-51-010-064
C. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(2) Open the access door 312AR.



EFF :
ALL
 27-44-51


R 
AIJ




Page 651
Feb 01/11

4. Procedure
_________
Subtask 27-44-51-220-053
A. Inspection Procedure
(Ref. Fig. 609/TASK 27-44-51-991-018)

NOTE : Do not clean the attachments before you do this inspection.


____
(1) On the two sides of the secondary nut trunnion (2), use a GAGE FEELER of 0.6 mm (0.0236 in.) to measure:
- The clearance A between the secondary nut trunnion (2) and the
bottom of the junction plate (3)
- The clearance A between the secondary nut trunnion (2) and the
top of the junction plate (3).
(a) If the measured clearance A is less than 0.6 mm (0.0236 in.):
- Replace the THSA before the subsequent flight (Ref. TASK 27-4451-000-001) and (Ref. TASK 27-44-51-400-001)
and do this inspection again.
(b) If the measured clearance A is 0.6 mm (0.0236 in.) or more than
0.6 mm (0.0236 in.):
- Do a detailed visual inspection of the lower attachment for
correct installation:
1
_

Make sure that the shafts, the brackets, the nuts and the
cotter pins are correctly installed (refer to Detail D).
NOTE : An incorrect installation (the nuts and the cotter pins
____
for the brackets are installed on the other side of the
lug) is permitted if (refer to Detail F):
- The clearance to the THS arm is more than 3.0 mm
(0.1181 in.) and
- There is no sign of contact wear.
If necessary, remove the related cotter pins to measure
the clearance with the GAGE - FEELER.
This deviation can stay until the next removal of the
THSA.

2
_

Make sure that the shoulder bush, the retainer washers and the
retainer nuts are correctly installed (refer to Section E-E).

(c) If installation deviations are found, contact AIRBUS before the


subsequent flight.



EFF :
ALL
 27-44-51



AIJ




Page 652
Feb 01/11

(d) If no installation deviations are found:


1
_

Clean the components/areas that follow, with a clean lint-free


cloth MISCELLANEOUS (Material No. 19-003) and the CLEANING
AGENTS (Material No. 11-026):
- The screw shaft of the THSA (1)
- The area around the secondary nut trunnion (2) and the
junction plate (3).

2
_

Let the components/areas dry.

5. Close-up
________
Subtask 27-44-51-410-063
A. Close Access
(1) Remove the PITCH TRIM CONTROL LOCKING (Ref. TASK 27-00-00-080-001).
(2) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)
from the mechanical input of the THS actuator.
(3) Remove the structural protection material.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Close the access door 312AR.
(6) Remove the warning notice(s).
(7) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 27-44-51-865-062
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51


R 
AIJ




Page 653
Feb 01/11

THSA Lower Attachments


Figure 609/TASK 27-44-51-991-018- 12 (SHEET 1)



EFF :
ALL
 27-44-51



AIJ




Page 654
Feb 01/11

THSA Lower Attachments


Figure 609/TASK 27-44-51-991-018- 22 (SHEET 2)



EFF :
ALL
 27-44-51



AIJ




Page 655
Feb 01/11

TASK 27-44-51-220-004
Detailed Inspection of THSA Upper Attachments for Secondary Load Path Loading
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274451-11
NOTE : Do this inspection before MPD-Task 274451-05-1 (if planned at the
____
same time).
Do not clean the attachments before you do this inspection.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
No specific
98D27403500000

1
1
1
1
1
2

circuit breaker(s) safety clip(s)


structural protection material
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
FLASHLIGHT
MIRROR - INSPECTION, FLEXIBLE
RULER 150 MM (6 IN) - METALLIC
WARNING NOTICE(S)
PITCH TRIM CONTROL LOCKING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-44-51


R 
AIJ




Page 656
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-080-001
27-00-00-480-001
27-40-00-040-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
27-44-51-000-001
27-44-51-400-001
R

27-44-51-991-019

Removal of the Pitch-Trim Control Locking Tool


(98D27403500000)
Installation of the Pitch-Trim Control Locking Tool
(98D27403500000)
Check of the synchronization between pitch trim
handwheel and stabilizer
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Removal of the Trimmable Horizontal Stabilizer (THS)
Actuator (9CE) (for corrective action)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE) (for corrective action)
Fig. 610

3. __________
Job Set-up
Subtask 27-44-51-860-068
A. Aircraft Maintenance Configuration
(1) Put the THSA in the 0 degree position (Ref. TASK 27-40-00-040-001).
(2) Depressurize the Green hydraulic system
(Ref. TASK 29-10-00-864-001).
(3) Depressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-864-002).
(4) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(5) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
(6) On the flight-compartment overhead-panel, on the hydraulic section
42VU:
- Put a WARNING NOTICE(S) in position to tell persons not to
pressurize the Green, Yellow and Blue hydraulic systems.



EFF :
ALL
 27-44-51



AIJ




Page 657
Feb 01/11

(7) On the ground service panels of the Green, Yellow and Blue hydraulic
systems:
- Put a WARNING NOTICE(S) in position to tell persons not to
pressurize the Green, Yellow and Blue hydraulic systems.
(8) Put the PITCH TRIM CONTROL LOCKING on the pitch-trim control-wheel in
the flight compartment (Ref. TASK 27-00-00-480-001).
(9) Put a WARNING NOTICE(S) in the flight compartment to tell persons not
to operate the pitch- trim controls.
(10) Put the structural protection material in the area of the THS
actuator to prevent damage to the structure.
Subtask 27-44-51-865-065
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-51-010-066
C. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(2) Open the access door 312AR.



EFF :
ALL
 27-44-51


R 
AIJ




Page 658
Feb 01/11

4. Procedure
_________
Subtask 27-44-51-220-054
A. Inspection Procedure
(Ref. Fig. 610/TASK 27-44-51-991-019)

NOTE : Do not clean the attachments before you do this inspection.


____
(1) Use a MIRROR - INSPECTION, FLEXIBLE and a FLASHLIGHT to do a check
for correct installation, cracks and damages on the items that
follow:
- The upper gimbal
- The no back housing yokes.
(a) Do a check of the front and aft no-back yoke for correct
installation:
- Make sure that the bolts, washers and key washers are correctly
installed (refer to Detail D and Section E-E).
(b) Do a check of the upper, lower, outer and inner profile of the
upper gimbal:
- Make sure that there are no cracks or ruptures (refer to Detail
D and Section E-E).
(c) Do a check of the gimbal for correct installation:
- Make sure that the two screws are safetied with lockwire (refer
to Detail G).
- Make sure that the retainer nut is correctly installed and
safetied (refer to Detail G).
- Make sure that the sliding bush is installed (use a RULER 150
MM (6 IN) - METALLIC and make sure that the measured value is
between 6.0 mm (0.2362 in.) and 7.5 mm (0.2952 in.)) (refer to
Detail G).
- Make sure that the nuts are correctly installed and safetied
with cotter pins (refer to Detail H).
(d) If cracks and/or damage are found:
- Replace the THSA before the subsequent flight (Ref. TASK 27-4451-000-001) and (Ref. TASK 27-44-51-400-001)
and do this inspection again.
(e) If no cracks and/or damage are found, use a MIRROR - INSPECTION,
FLEXIBLE and a FLASHLIGHT to do a check for metallic particles on
the:
- Spherical bearing (refer to Section C-C)
- Base of the tie rod sphere (refer to Section F-F).



EFF :
ALL
 27-44-51



AIJ




Page 659
Feb 01/11

THSA Upper Attachments


Figure 610/TASK 27-44-51-991-019- 13 (SHEET 1)



EFF :
ALL
 27-44-51



AIJ




Page 660
Feb 01/11

THSA Upper Attachments


Figure 610/TASK 27-44-51-991-019- 23 (SHEET 2)



EFF :
ALL
 27-44-51



AIJ




Page 661
Feb 01/11

THSA Upper Attachments


Figure 610/TASK 27-44-51-991-019- 33 (SHEET 3)



EFF :
ALL
 27-44-51



AIJ




Page 662
Feb 01/11

(f) If metallic particles are found, contact AIRBUS before the


subsequent flight.
(g) If no metallic particles are found:
1
_

Clean the components/areas that follow, with a clean lint-free


cloth MISCELLANEOUS (Material No. 19-003) and the CLEANING
AGENTS (Material No. 11-026):
- The upper gimbal
- The no back housing yokes
- The spherical bearing
- The base of the tie rod sphere.

2
_

Let the components/areas dry.

5. Close-up
________
Subtask 27-44-51-410-065
A. Close Access
(1) Remove the PITCH TRIM CONTROL LOCKING tool (Ref. TASK 27-00-00-080001).
(2) Remove the structural protection material.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the access door 312AR.
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 27-44-51-865-066
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-51



AIJ




Page 663
Feb 01/11

MOTOR - THS ACTUATOR - REMOVAL/INSTALLATION


___________________________________________
TASK 27-44-53-000-001
Removal of the THS Actuator Motor
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 CAP - BLANKING
1 PLUG - BLANKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
29-00-00-910-002
29-10-00-864-002
27-44-53-991-001

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurize the Yellow Hydraulic System
Fig. 401



EFF :
ALL
 27-44-53



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-44-53-991-001)
Subtask 27-44-53-010-050
A. Get Access
(1) Open the access door 312AR.
R

(2) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


Subtask 27-44-53-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-53-860-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Put the warning notices in the flight compartment to tell persons not
to operate the pitch controls.
(3) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).



EFF :
ALL
 27-44-53



AIJ




Page 402
Feb 01/11

R
R

THS Actuator Motor


Figure 401/TASK 27-44-53-991-001



EFF :
ALL
 27-44-53



AIJ




Page 403
Feb 01/07

(5) Depressurize the reservoirs of the Green and Yellow hydraulic


systems.
(Ref. TASK 29-10-00-864-002).
(6) Put the warning notices in position to tell persons not to pressurize
the Green, the Yellow and the Blue hydraulic systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Green, the Yellow and the Blue
hydraulic systems.
4. Procedure
_________
Subtask 27-44-53-020-050
A. Removal of the THS Actuator Motor
(Ref. Fig. 401/TASK 27-44-53-991-001)

NOTE : The two THS actuator motors (2) are the same. The removal of one
____
of the motors (2) only is given.
(1) Remove the THS actuator motor (2) from the THS casing as follows:
(a) Remove the screws (7) and the washers (8) from the motor (2).
(b) Remove the motor (2) from the splined shaft (20).
NOTE : Carefully disengage the motor (2) from the spacer tube
____
assemblies (3),(4),(5).
(2) Remove the spacer tube assembly (4) from the THS casing as follows:
(a) Disengage the spacer tube assembly (4) from the valve block unit
(6).
(b) Remove and discard the O-rings (14) from the spacer tube (15).
(3) Remove the spacer tube assembly (5) from the THS casing as follows:
(a) Remove the expansion plug (18) from the spacer tube (19).
(b) Disengage the spacer tube (19) from the valve block unit (6).
(c) Remove and discard the back-up rings (16) and the O-rings (17)
from the ends of the spacer tube (19).



EFF :
ALL
 27-44-53



AIJ




Page 404
Feb 01/07

(4) Remove the spacer tube assembly (3) from the THS casing as follows:
(a) Remove the expansion plug (12) from the spacer tube (13).
(b) Disengage the spacer tube (13) from the valve block unit (6).
(c) Remove and discard the back-up rings (10) and the O-rings (11)
from the ends of the spacer tube (13).
(5) Put a PLUG - BLANKING in each open port of the valve block unit (6).
(6) Put a CAP - BLANKING on each end of the spacer tubes (13),(15),(19).



EFF :
ALL
 27-44-53



AIJ




Page 405
Feb 01/07

TASK 27-44-53-400-001
Installation of the THS Actuator Motor
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______
THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY
HYDRAULIC POWER TO THE AIRCRAFT.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
0U145413
0U145414

warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 CONE - MOUNTING, THS ACTUATOR
1 RING - SHRINKING, THS ACTUATOR



EFF :
ALL
 27-44-53



AIJ




Page 406
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-015
Material No. 11-002

USA BAC 5001


DACO-5073
GREASE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------10
11
14
16
17

back-up rings
O-rings
O-rings
back-up rings
O-rings

27-44-51
27-44-51
27-44-51
27-44-51
27-44-51

03
03
03
03
03

-040
-030
-100
-080
-070

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-13-27-612-001
27-41-00-720-001
29-00-00-864-001

29-00-00-910-002
29-14-00-614-001
27-44-53-991-001

Oil Replenishment of the THS Actuator (9CE)


Functional Test of the THS-Actuator Overtravel
Related to the Mechanical Indicator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Safety Procedures of the Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 401



EFF :
ALL
 27-44-53



AIJ




Page 407
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-44-53-991-001)
Subtask 27-44-53-860-051
A. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
R
R

(2) Make sure that the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE is in
position below the access door 312AR.
(3) Make sure that the access door 312AR is open.
(4) Make sure that the warning notices are in position in the cockpit to
tell persons not to operate the pitch controls.
(5) Make sure that the hydraulic systems are depressurized and put them
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(6) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized.
(Ref. TASK 29-14-00-614-001).
(7) Make sure that the warning notices are in position to tell persons
not to pressurize the Green, the Yellow and the Blue hydraulic
systems:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panels of the Green, Yellow and Blue
hydraulic systems.



EFF :
ALL
 27-44-53



AIJ




Page 408
Feb 01/11

Subtask 27-44-53-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-53-210-050
C. Visual Inspection
(1) Clean the interface of the THS actuator motor (2) with CLEANING
AGENTS (Material No. 11-002) and let it dry.
(2) Clean the interface of the THS actuator (1) with CLEANING AGENTS
(Material No. 11-002) and let it dry.
(3) Make sure that the subsequent components are clean, have no corrosion
and show no damage:
- the interface of the THS actuator (1),
- the splined shaft (20),
- the screws (7),
- the expansion plugs (12),(18),
- the spacer tubes (13),(15),(19),
(4) Apply COMMON GREASE (Material No. 04-015) to the splined shaft (20).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-44-53-991-001)


Subtask 27-44-53-560-050
A. Preparation of the Replacement Components
(1) Install the spacer tube assemblies (3),(4),(5).
NOTE : The two THS actuator motors (2) are the same. The installation
____
of one of the motors (2) only is given.



EFF :
ALL
 27-44-53



AIJ




Page 409
Feb 01/07

(2) Remove the blanking plugs from the ports of the valve block unit (6).
(3) Remove the blanking caps from the ends of the spacer tubes
(13),(15),(19).
(4) Install the spacer tube assembly (4).
(a) Apply COMMON GREASE (Material No. 04-015) to the O-rings (14).
(b) Put the O-rings (14) in position at each end of the spacer tube
(15).
(c) Put the spacer tube assembly (4) in position in the base plate of
the motor (2).
(5) Install the spacer tube assembly (3).
(a) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) and the RING SHRINKING, THS ACTUATOR (0U145414) to put the back-up rings (10)
in position at each end of the spacer tube (13).
(b) Apply COMMON GREASE (Material No. 04-015) to the O-rings (11).
(c) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) and put two
O-rings (11) in position at each end of the spacer tube (13).
(d) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) and the RING SHRINKING, THS ACTUATOR (0U145414) to put a second back-up ring
(10) in position at each end of the spacer tube (13).
(e) Put the expansion plug (12) in position in the base plate of the
motor (2).
(f) Put the spacer tube assembly (3) on the expansion plug (12).
(6) Install the spacer tube assembly (5).
(a) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) and the RING SHRINKING, THS ACTUATOR (0U145414) to put the back-up rings (16)
in position at each end of the spacer tube (19).
(b) Apply COMMON GREASE (Material No. 04-015) to the O-rings (17).
(c) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) and put two
O-rings (17) in position at each end of the spacer tube (19).



EFF :
ALL
 27-44-53



AIJ




Page 410
Feb 01/07

(d) Use the CONE - MOUNTING, THS ACTUATOR (0U145413) ant the RING SHRINKING, THS ACTUATOR (0U145414) to put a second back-up ring
(16) in position at each end of the spacer tube (19).
(e) Put the expansion plug (18) in position in the base plate of the
motor (2).
(f) Put the spacer tube assembly (5) on the expansion plug (18).
Subtask 27-44-53-420-050
B. Installation of the THS Actuator Motor
(1) Put the motor (2) in position on the splined shaft (20).
NOTE : Make sure that the splined shaft (20) engages easily with the
____
internal splines of the motor (2).
(2) Carefully engage the ends of the spacer tube assemblies (3),(4),(5)
in the valve block (6).
(3) Install the screws (7) and the washers (8) in the motor (2).
(4) TORQUE the screws (7) to between 0.5 and 0.6 m.daN (44.24 and 53.09
lbf.in).
Subtask 27-44-53-080-050
C. Preparation for Test
(1) Make sure that the THS actuator (9CE) has the correct quantity of oil
(Ref. TASK 12-13-27-612-001).
(2) Do a visual check and make sure that:
- the travel range of the THS actuator,
- the travel ranges of the control surfaces,
are clear of tools and other items.
Subtask 27-44-53-865-051
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE2, 19CE1, 19CE3.



EFF :
ALL
 27-44-53


R 
AIJ




Page 411
Feb 01/07

Subtask 27-44-53-720-050
E. Test
(1) Do a functional test of the THS control (Ref. TASK 27-41-00-720-001).
(2) Examine the THS actuator (9CE) and make sure that there is no
leakage.
5. Close-up
________
Subtask 27-44-53-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-53


R 
AIJ




Page 412
Feb 01/07

BRAKE - PRESSURE OFF, THS ACTUATOR - ADJUSTMENT/TEST


____________________________________________________
TASK 27-44-54-720-001
Functional Test of the Pressure-Off Brakes
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MPD TASK: 274400-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
R
R

specific
specific
specific
specific

No specific
0U145506

circuit breaker(s) safety clip(s)


warning notices
access platform 5.5 m (18 ft. 1 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 CONE - MOUNTING, THS ACTUATOR

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 04-015

lockwire 0.6 mm (0.024 in.)


USA BAC 5001
DACO-5073
GREASE (Ref. 20-31-00)



EFF :
ALL
 27-44-54



AIJ




Page 501
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4

O-ring

27-44-51 02 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-44-51-000-001
27-44-51-400-001
R

27-44-54-991-002

Removal of the Trimmable Horizontal Stabilizer (THS)


Actuator (9CE) (for corrective action)
Installation of the Trimmable Horizontal Stabilizer
(THS) Actuator (9CE) (for corrective action)
Fig. 501

3. __________
Job Set-up
Subtask 27-44-54-010-051
A. Get Access
(1) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
(2) Put the access platform in position.
(3) Open the access door 312AR.
Subtask 27-44-54-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-54



AIJ




Page 502
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 501/TASK 27-44-54-991-002)


Subtask 27-44-54-720-051
A. Functional Test of the Pressure-Off Brakes (2):
(1) Cut and remove the lockwire which safeties the plug (3) to the screw
(5) at the THS actuator motor (6).
(2) Remove the plug (3) from the manual drive input of the THS actuator
(1).
(3) Remove and discard the O-ring (4) from the plug (3).
(4) Use a torque wrench to between 1.0 and 10.0 m.daN (88.49 and 884.95
lbf.in) for the subsequent test.
(5) Put the torque wrench in position at the manual drive input, apply a
torque of minimum 7.2 m.daN (53.09 lbf.ft). Make sure that the
pressure-off brakes do not move.
NOTE : The static break-out torque must be a minimum of 7.2 m.daN
____
(53.09 lbf.ft).
- If the static break-out torque is between 6.5 m.daN (47.93
lbf.ft) and 7.2 m.daN (53.09 lbf.ft), replace the THS
actuator in less than 600FH or 750FC or 100 days (Ref. TASK
27-44-51-000-001) and (Ref. TASK 27-44-51-400-001). Do the
replacement in the limits that come first.
- If the static break-out torque is less than 6.5 m.daN (47.93
lbf.ft), replace the THS actuator before next flight (Ref.
TASK 27-44-51-000-001) and (Ref. TASK 27-44-51-400-001).
(6) Remove the torque wrench.
(7) Apply COMMON GREASE (Material No. 04-015) to the new O-ring (4).
(8) Use the CONE - MOUNTING, THS ACTUATOR (0U145506) and put the O-ring
(4) on the plug (3).
(9) Install the plug (3) in the manual drive input.
(10) TORQUE the plug (3) to between 1.4 and 1.6 m.daN (10.32 and 11.79
lbf.ft).



EFF :
ALL
 27-44-54



AIJ




Page 503
Feb 01/07

Functional Test of the Pressure-Off Brakes


Figure 501/TASK 27-44-54-991-002



EFF :
ALL
 27-44-54



AIJ




Page 504
Nov 01/10

(11) Safety the plug (3) to the screw (5) at the motor (6) with lockwire
0.6 mm (0.024 in.).
5. Close-up
________
Subtask 27-44-54-865-054
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
Subtask 27-44-54-410-051
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-54


R 
AIJ




Page 505
Feb 01/07

TRANSDUCER - THS ACTUATOR POSITION - REMOVAL/INSTALLATION


_________________________________________________________
TASK 27-44-56-000-001
Removal of the Position Transducer from the THS Actuator 9CE
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
0U190360

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-00-00-864-001
27-44-56-991-001

Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
Fig. 401



EFF :
ALL
 27-44-56



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-44-56-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
Subtask 27-44-56-860-051
B. Aircraft Maintenance Configuration
(Ref. Fig. 401/TASK 27-44-56-991-001)
(1) Turn the pitch-trim control wheel in the cockpit and put the THS
actuator (1) near to the zero position.
(2) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator (1).
(3) Put the warning notices in the cockpit to tell persons not to operate
the pitch controls.
Subtask 27-44-56-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
Subtask 27-44-56-860-050
D. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(2) Put the warning notices in position to tell persons not to pressurize
the Green and the Yellow hydraulic systems.



EFF :
ALL
 27-44-56



AIJ




Page 402
Feb 01/11

R
R

Position Transducer
Figure 401/TASK 27-44-56-991-001



EFF :
ALL
 27-44-56



AIJ




Page 403
Feb 01/07

4. Procedure
_________
(Ref. Fig. 401/TASK 27-44-56-991-001)
Subtask 27-44-56-020-050
A. Removal of the Position Transducer
NOTE : The removal of the Command Position Transducer and the Monitor
____
Position Transducer is the same. The removal procedure for one of
the position transducers only is given.
(1) Disconnect the electrical connectors (3),(4) from the receptacles
(5),(6).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Hold the position transducer (2) and remove the screws (7) and the
washers (8).
(4) Remove the position transducer (2) from the THS actuator (1).



EFF :
ALL
 27-44-56



AIJ




Page 404
May 01/10

TASK 27-44-56-400-001
Installation of the Position Transducer to the THS Actuator 9CE
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R

0U190360

warning notices
access platform 5.5 m (18 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER



EFF :
ALL
 27-44-56



AIJ




Page 405
May 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-002
R
R
R

Material No. 19-018

USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS ST L OR NICKEL ALLOY
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------9

packing

27-44-56 01 -020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-00-720-001
27-44-51-210-004
29-00-00-864-001
27-44-56-991-001

Functional Test of the THS-Actuator Overtravel


Related to the Mechanical Indicator
Check the Oil Level of the Gearbox of the
THS-Actuator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401

3. __________
Job Set-up
Subtask 27-44-56-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the THS actuator (1) near to the zero position.



EFF :
ALL
 27-44-56



AIJ




Page 406
May 01/10

R
R

(3) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) is installed in the mechanical input of the THS actuator
(1).
(4) Make sure that the warning notices are in the position.
(5) Make sure that the access platform is in position.
(6) Make sure that the access door is opened 312AR.
Subtask 27-44-56-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
4. Procedure
_________
(Ref. Fig. 401/TASK 27-44-56-991-001)
Subtask 27-44-56-910-052
A. Preparation for the Installation
(1) Make sure that the interface of the THS actuator (1) is clean and has
no corrosion and shows no damage.
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Make sure that the electrical connectors are clean and in the correct
condition.
(4) Clean the interface of the THS actuator (1) and the position
transducer (2) with the CLEANING AGENTS (Material No. 11-002) and let
it dry.
(5) Make sure that the packing (9) is in the correct condition. If
necessary, replace the packing.



EFF :
ALL
 27-44-56



AIJ




Page 407
May 01/10

Subtask 27-44-56-420-050
B. Installation of the Position Tranducer
NOTE : The installation of the Command Position Transducer and the
____
Monitor Position Transducer is the same. The installation
procedure for one of the position transducers only is given.
(1) Put the position transducer (2) in position at the THS actuator (1).
(2) Hold the position transducer (2) in position at the THS actuator (1)
and attach it with the screws (7) and the washers (8).
(3) TORQUE the screws (7) to between 0.76 and 0.94 m.daN (67.25 and 83.18
lbf.in).
R
R

(4) Safety the screws (7) with lockwire 0.6 mm (0.0236 in.) MISCELLANEOUS
(Material No. 19-018).

(5) Remove the blanking caps and connect the electrical connectors
(3),(4) to the receptacles (5),(6).
Subtask 27-44-56-860-052
C. Preparation for the Test
(1) Make sure that the THS actuator 9CE has the correct quantity of oil
(Ref. TASK 27-44-51-210-004).
(2) Remove the rigging pin OU 190360 from the mechanical input of the THS
actuator 9CE.
(3) Make sure that the travel range of the THS actuator 9CE and the
travel range of the control surfaces are free.
Subtask 27-44-56-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
Subtask 27-44-56-720-050
E. Do a functional test of the THS actuator overtravel related to the
mechanical indicator (Ref. TASK 27-41-00-720-001).



EFF :
ALL
 27-44-56



AIJ




Page 408
May 01/10

5. Close-up
________
Subtask 27-44-56-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-56



AIJ




Page 409
Aug 01/07

ACTUATOR - PITCH TRIM, THS - REMOVAL/INSTALLATION


_________________________________________________
TASK 27-44-57-000-001
Removal of the Pitch Trim Actuator from the THS Actuator 9CE
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
0U190360

blanking caps
circuit breaker(s) safety clip(s)
warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
27-44-57-991-001

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Fig. 401



EFF :
ALL
 27-44-57



AIJ




Page 401
Feb 01/11

3. __________
Job Set-up
Subtask 27-44-57-010-050
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
Subtask 27-44-57-860-050
B. Aircraft Maintenance Configuration
(1) Turn the pitch-trim control wheel in the cockpit and put the THS
actuator (1) to the zero position.
(2) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator (1).
(3) Put warning notices in the cockpit to tell persons not to operate the
pitch controls.
(4) Depressurize the Green and the Yellow hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(5) Put warning notices in position to tell persons not to pressurize the
Green and the Yellow hydraulic systems.
Subtask 27-44-57-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-57



AIJ




Page 402
Feb 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-44-57-991-001)
Subtask 27-44-57-020-050
A. Removal of the Pitch Trim Actuator
(1) Disconnect the electrical connectors (3),(4),(5),(6) from the
receptacles (7),(8),(9),(10) on the pitch trim actuator (2).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Hold the pitch trim actuator (2) and remove the screws (11) and the
washers (12).
(4) Remove the pitch trim actuator (2) from the THS actuator (1).



EFF :
ALL
 27-44-57



AIJ




Page 403
May 01/10

R
R

Pitch Trim Actuator


Figure 401/TASK 27-44-57-991-001



EFF :
ALL
 27-44-57



AIJ




Page 404
Feb 01/07

TASK 27-44-57-400-001
Installation of the Pitch Trim Actuator to the THS Actuator 9CE
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
0U190360

warning notices
access platform 5.5 m (18 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-002
R
R
R

Material No. 19-018

USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS ST L OR NICKEL ALLOY
(Ref. 20-31-00)



EFF :
ALL
 27-44-57



AIJ




Page 405
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-00-730-001
27-44-51-210-004
29-00-00-864-001
27-44-57-991-001

System Test of the THS Actuator Electrical Control


Check the Oil Level of the Gearbox of the
THS-Actuator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401

3. __________
Job Set-up
Subtask 27-44-57-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the THS actuator (1) is in the zero position.
R
R

(4) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER


(0U190360) is in the mechanical input of the THS actuator (1).
(5) Make sure that the access platform is in position.
(6) Make sure that the the access door 312AR is open.
Subtask 27-44-57-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-57



AIJ




Page 406
Aug 01/09

4. Procedure
_________
(Ref. Fig. 401/TASK 27-44-57-991-001)
Subtask 27-44-57-910-050
A. Preparation for the Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the interface of the THS actuator (1) and the pitch trim
actuator (2) with CLEANING AGENTS (Material No. 11-002) and let it
dry.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 27-44-57-420-050
B. Installation of the Pitch Trim Actuator (PTA)
CAUTION : ALIGN THE INPUT SHAFT SPLINES OF THE THS-ACTUATOR WITH THE
_______
DRIVING GEAR SPLINES OF THE PTA.
THIS WILL PREVENT DAMAGE TO THE PTA.
(1) Put the pitch trim actuator (2) in position at the THS actuator (1).
(2) Make sure that the splines of the pitch trim actuator (2) align with
the splines of the THS actuator (1).
(3) If necessary, turn the mechanical input of the THS actuator to align
the splines.
(4) Install the screws (11) and the washers (12) to attach the pitch trim
actuator (2) at the THS actuator (1).
(5) TORQUE the screws (11) to between 0.76 and 0.94 m.daN (67.25 and
83.18 lbf.in).


EFF :
ALL
 27-44-57


R 
AIJ




Page 407
May 01/10

R
R

(6) Safety the screws (11) with lockwire 0.6 mm (0.0236 in.)
MISCELLANEOUS (Material No. 19-018).

(7) Remove the blanking caps and connect the electrical connectors
(3),(4),(5),(6) to the receptacles (7),(8),(9),(10).
Subtask 27-44-57-860-054
C. Preparation for the Test
(1) Make sure that the THS actuator 9CE has the correct quantity of oil
(Ref. TASK 27-44-51-210-004).
(2) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)
from the mechanical input of the THS actuator 9CE.
(3) Make sure that the travel range of the THS actuator 9CE and the
control surfaces are free.
Subtask 27-44-57-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3
Subtask 27-44-57-720-050
E. Do the system test of the THS actuator electrical control (Ref. TASK 2741-00-730-001).
5. Close-up
________
Subtask 27-44-57-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-57



AIJ




Page 408
May 01/10

TASK 27-44-57-000-002
Removal of the Electronic Modules of the Pitch Trim Actuator
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for one of the electronic modules is given. The
____
removal procedure for all the electronic modules is almost the same.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
0U190360

circuit breaker(s) safety clip(s)


warning notices
1 ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
27-44-57-991-002

Depressurize the Green Hydraulic System


Depressurize the Yellow Hydraulic System
Fig. 402



EFF :
ALL
 27-44-57



AIJ




Page 409
Feb 01/11

3. __________
Job Set-up
Subtask 27-44-57-010-051
A. Get Access
R

(1) Put the ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position.


(2) Open the access door 312AR.
Subtask 27-44-57-860-051
B. Aircraft Maintenance Configuration
(1) Turn the pitch-trim control wheel in the cockpit and put the THS
actuator to the zero position.
(2) Put the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360) in
the mechanical input of the THS actuator.
(3) Put warning notices in the cockpit to tell persons not to operate the
pitch controls.
(4) Depressurize the Green and the Yellow hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(5) Put warning notices in position to tell persons not to pressurize the
Green and the Yellow hydraulic systems.
Subtask 27-44-57-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16



EFF :
ALL
 27-44-57



AIJ




Page 410
Feb 01/11

4. Procedure
_________
(Ref. Fig. 402/TASK 27-44-57-991-002)
Subtask 27-44-57-020-051
A. Removal of the Electronic Modules from the Pitch Trim Actuator
R
R

(1) Hold the electronic module (2) and remove the bolts (6) and (8) and
the washers (5) and (7).

(2) Carefully remove the electronic module (2) from the motor assembly
(3) and the pitch trim actuator (1).



EFF :
ALL
 27-44-57



AIJ




Page 411
Aug 01/08

R
R

Electronic Module
Figure 402/TASK 27-44-57-991-002



EFF :
ALL
 27-44-57



AIJ




Page 412
Feb 01/07

TASK 27-44-57-400-002
Installation of the Electronic Modules of the Pitch Trim Actuator
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for one of the electronic modules is given.
____
The installation procedure for all the electronic modules is almost the
same.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
0U190360

warning notices
access platform 5.5 m (18 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER



EFF :
ALL
 27-44-57


R 
AIJ




Page 413
May 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-001
Material No. 11-002
R
R
R

Material No. 19-018

USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLSS ST L OR NICKEL ALLOY
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-41-00-730-001
27-44-51-210-004
29-00-00-864-001
27-44-57-991-002

System Test of the THS Actuator Electrical Control


Check the Oil Level of the Gearbox of the
THS-Actuator
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 402

3. __________
Job Set-up
Subtask 27-44-57-860-055
A. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(2) Make sure that the warning notices are in position.
(3) Make sure that the THS actuator (1) is in the zero position.
(4) Make sure that the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER
(0U190360) is in the mechanical input of the THS actuator (1).
(5) Make sure that the access platform is in position.



EFF :
ALL
 27-44-57



AIJ




Page 414
May 01/10

(6) Make sure that the the access door 312AR is open.
Subtask 27-44-57-865-056
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
4. Procedure
_________
(Ref. Fig. 402/TASK 27-44-57-991-002)
Subtask 27-44-57-910-051
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the contact surface of the electronic module with CLEANING
AGENTS (Material No. 11-002).
(2) Apply SEALANTS (Material No. 09-001) to the face of the electronic
module (2) which touches the housing of the Pitch Trim Actuator (PTA)
(1).



EFF :
ALL
 27-44-57


R 
AIJ




Page 415
May 01/10

Subtask 27-44-57-420-051
B. Installation of the Electronic Modules
(1) Carefully put the electronic module (2) in position on the motor
assembly (3) and the pitch trim actuator (1).
(2) Attach the electronic module (2) to the motor assembly (3) and the
pitch trim actuator (1) with the washers (5) and (7) and the bolts
(6) and (8).
(3) TORQUE the bolts (6) and (8) to between 0.4 and 0.5 m.daN (35.39 and
44.24 lbf.in).
R
R

(4) Safety the bolts (6) and (8) with lockwire 0.6 mm (0.0236 in.)
MISCELLANEOUS (Material No. 19-018).
Subtask 27-44-57-860-056
C. Preparation for the Test
(1) Make sure that the actuator of the Trimmable Horizontal Stabilizer
(THS) has the correct quantity of oil (Ref. TASK 27-44-51-210-004).
(2) Remove the PIN-RIGGING,THS ACTUATOR,MECHANICAL INPUT LEVER (0U190360)
from the mechanical input of the THS actuator.
(3) Make sure that the travel range of the THS actuator and the control
surfaces are free.
Subtask 27-44-57-865-054
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
15CE1, 16CE1, 19CE1, 19CE2, 19CE3.
Subtask 27-44-57-710-051
E. Do the system test of the THS actuator electrical control (Ref. TASK 2741-00-730-001).



EFF :
ALL
 27-44-57



AIJ




Page 416
May 01/10

5. Close-up
________
Subtask 27-44-57-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 312AR.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-44-57



AIJ




Page 417
May 01/10

THS POSITION INDICATING - DESCRIPTION AND OPERATION


___________________________________________________
1. _______
General
(Ref. Fig. 001)
On the center pedestal, adjacent to each pitch-trim control wheel, the THS
position is indicated by an index on a scale painted green over the normal
takeoff range (2.5 deg. aircraft NOSE DN to 2.5 deg. aircraft NOSE UP).
The THS position is repeated via the FCDC (Ref. 27-95) on the lower ECAM
display unit, together with the hydraulic systems still available for the
actuator.
There is a special reference mark painted on the THS and on the adjacent
structure.



EFF :
ALL
 27-45-00



AIJ




Page 1
Feb 01/07

Center Pedestal - THS Position Indicating


Figure 001



EFF :
ALL
 27-45-00



AIJ




Page 2
May 01/09

FLAPS - DESCRIPTION AND OPERATION


_________________________________
1. General
_______
A. System Configuration
The aircraft has four flaps (two on each trailing edge of the wing) and
ten slats (five on each leading edge of the wing) (Ref. 27-80-00) to
increase lift during take-off and landing.
The outboard flap is connected to the flap track carriage at the track 3
and the track 4 positions by a failsafe bolt assembly. The inboard flap
is connected to the track 2 carriage by a failsafe bolt assembly and to
the pendulum assembly on the track 1 carriage by the flap trunnion. The
carriages move along the tracks which are part of the flap-track beam
assemblies.
An interconnecting strut connects the inboard and the outboard flaps.
Proximity sensors on the interconnecting strut send signals to stop the
flap movement, if the strut moves more than the specified limit.
Two Slat/Flap Control Computers (SFCC1 and SFCC2) monitor and control the
flaps. An Instrumentation Position Pick-Off Unit (IPPU) is installed on
the Power Control Unit (PCU). The IPPU sends signals to the Electronic
Instrument System (EIS), which shows the position of the flaps.
A Feedback Position Pick-Off Unit (FPPU) gives signals of the output
shaft position of the PCU. Two Asymmetry Position Pick-Off Units (APPU)
give signals of the flap position or speed. The SFCC1 and the SFCC2
receive and monitor the signals from the FPPU and the APPUs.
2. Component
__________________
Location
(Ref. Fig. 001)
3. System
__________________
Description
(Ref. Fig. 002)
A. Electrical Control and Monitoring System (Ref. 27-51-00)
The slat and flap control lever controls the position of the flaps. The
Command Sensor Unit (CSU) identifies the position of the slat and flap
control lever and sends related signals to each SFCC. Each SFCC controls
the valve block of a hydraulic motor, which is part of the flap PCU.
The FPPU, which is part of the flap PCU, and the two APPUs send related
signals to the SFCCs. If the SFCCs find a failure in the system, the Wing
Tip Brakes (WTB) operate to hold the transmission and the PCU is stopped.



EFF :
ALL
 27-50-00



AIJ




Page 1
Feb 01/07

Flap System - Component Location


Figure 001


EFF :
ALL
 27-50-00



AIJ




Page 2
Feb 01/07

Flaps Electrical Control and Monitoring - Schematic


Figure 002


EFF :
ALL
 27-50-00



AIJ




Page 3
Feb 01/07

B. Hydraulic Actuation and Power Transmission (Ref. 27-54-00)


A hydro-mechanical PCU supplies mechanical power to the power
transmission system. The PCU has two separate hydraulic motors and two
Pressure-Off Brakes (POB). Each hydraulic motor has an electrically
controlled valve block, which receives signals from a SFCC.
Torque shafts and gearboxes in the fuselage and the wings transmit the
mechanical power from the flap PCU to the actuators, which move the
flaps. Each flap has two actuators. Actuator 1 is installed on track beam
1 and the actuators 2, 3 and 4 are installed on the rear spar. Torque
limiters in the actuators prevent the mechanical overload of the
structure.
4. Power
____________
Supply
(Ref. Fig. 003)
5. _________
Interface
(Ref. Fig. 004)
6. _____________________
Component Description
Not Applicable
7. Operation/Control
________________________________
and Indicating
(Ref. Fig. 001, 003)
A. Extension and Retraction of the Flaps
The operation of the flaps is hydro-mechanical. The PCU operates the
mechanical transmission system which moves the flaps to the set position.
The CSU changes the mechanical signals from the slat and flap control
lever into electrical signals. These are sent to the SFCC1 and the SFCC2.
They compare the position signal with that from the FPPU. When there is a
difference between the signals, the SFCC sends a discrete signal to its
related valve block of the flap PCU.
Each valve block lets hydraulic fluid flow to and from its hydraulic
motor, in relation to the signal from the SFCC. It thus controls the
direction in which the hydraulic motor turns (for extension and
retraction of the flaps) and its speed (low or high speed).
The torque from the hydraulic motors is transmitted to the differential
gearbox, which connects the two motors. The mechanical transmission
system then transmits the torque to the actuators which move the flaps.



EFF :
ALL
 27-50-00



AIJ




Page 4
Feb 01/07

Hydraulic System - Schematic


Figure 003



EFF :
ALL
 27-50-00



AIJ




Page 5
Aug 01/11

Slat/Flap Interface
Figure 004


EFF :
ALL
 27-50-00



AIJ




Page 6
Feb 01/07

B. Hydraulic Actuation and Power Transmission


The two hydraulic motors in the PCU give hydraulic actuation. Each
hydraulic motor gets power from a different hydraulic system, the Green
hydraulic system or the Yellow.
Each hydraulic motor has a valve block and POB. The valve blocks control
the direction of rotation and the speed of the output shaft of the PCU.
The POB holds the output shaft of the hydraulic motor:
- against torque from the airloads
- when there is a failure in its related hydraulic system
- to lock the transmission at the same time as the WTB.
The flap system will operate at half speed if there is a failure of:
- one electrical supply
- one hydraulic system
- one SFCC, or the failure of one of two electrical components
- one engine.
C. Asymmetry and Power Transmission Monitoring
The SFCC1 and the SFCC2 continuously compare position data from the APPUs
and the FPPU to monitor the system. They use this data to find asymmetry,
runaway and speed failure conditions.
When one SFCC monitors a failure condition:
- the other SFCC receives a WTB-arm signal
- the related PCU motor stops and its POB operates
- the system operates at half speed.
If the other SFCC also sends a WTB-arm signal:
- the applicable WTBs operate
- the other PCU motor stops
- the system locks and gives a warning to the flight crew.
D. Position Indicating
The upper display unit of the ECAM system shows the position of the
flaps. The IPPU, which is installed on the PCU, supplies flap position
data to the flight data recorder and the Flight Warning Computer (FWC)
(Ref. 27-55-00).
A visual check of the position of the flaps can be done through the
windows in the fuselage that are adjacent to the flaps. The windows to be
used are identified by a brown triangle on the sidewall panel above them.



EFF :
ALL
 27-50-00



AIJ




Page 7
Feb 01/07

8. BITE
_________
Test
(Ref. Fig. 005, 006)
The flap system has a Built-In Test Equipment (BITE). You can do tests of
the system through the Multipurpose Control and Display Unit (MCDU) in the
aircraft cockpit (Ref. 27-51-00). The MCDU also indicates any failures in
the system and gives trouble shooting data for the system. The two SFCCs
also do a BITE check on power-up.



EFF :
ALL
 27-50-00



AIJ




Page 8
Feb 01/07

INTENTIONALLY BLANK




 27-50-00



AIJ




Page 9
Feb 01/07

MCDU System Displays - SFCC Test


Figure 005 (SHEET 1)


EFF :
ALL
 27-50-00



AIJ




Page 10
Feb 01/07

MCDU System Displays - SFCC Test


Figure 005 (SHEET 2)


EFF :
ALL
 27-50-00



AIJ




Page 11
Feb 01/07

MCDU System Displays - SFCC Test


Figure 005 (SHEET 3)


EFF :
ALL
 27-50-00



AIJ




Page 12
Feb 01/07

INTENTIONALLY BLANK




 27-50-00



AIJ




Page 13
Feb 01/07

MCDU System Displays - WTB/POB Test


Figure 006 (SHEET 1)


EFF :
ALL
 27-50-00



AIJ




Page 14
Feb 01/07

MCDU System Displays - WTB/POB Test


Figure 006 (SHEET 2)


EFF :
ALL
 27-50-00



AIJ




Page 15
Feb 01/07

FLAPS - MAINTENANCE PRACTICES


_____________________________
TASK 27-50-00-866-008
Extension of the Flaps on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To extend the flaps without movement of the slats. To extend the flaps and
slats at the same time (Ref. TASK 27-50-00-866-00801).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-50-00



AIJ




Page 201
Aug 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-00-00-480-002
29-10-00-863-002
29-10-00-864-002
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Pressurize the Yellow Hydraulic System
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-50-00-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
system is in operation.
Subtask 27-50-00-860-054
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-863-002).
NOTE : The flaps move at full-speed if the Power Transfer Unit (PTU)
____
is in operation. If the PTU is isolated (electrically or
hydraulically), only the yellow flap motor operates and the
flaps move at half-speed.



EFF :
ALL
 27-50-00


R 
AIJ




Page 202
Feb 01/07

An ECAM F/CTL FLAP SYS 1 FAULT message will also be displayed


when the PTU is isolated. This can be ignored.
Subtask 27-50-00-865-054
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-50-00-865-055
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
Subtask 27-50-00-866-052
A. Extension of the Flaps on the Ground
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(2) Set the flap/slat control lever to position 1, 2, 3 or FULL.
(3) Make sure that on the upper display unit of the ECAM system the flap
position bar moves to the set position.
R
R

(4) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the flap/slat
control lever.



EFF :
ALL
 27-50-00



AIJ




Page 203
Aug 01/07

5. Close-up
________
Subtask 27-50-00-860-055
A. Aircraft Configuration
(1) Depressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-864-002).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-50-00-942-055
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 204
Feb 01/07

TASK 27-50-00-866-008- 01
Extension of the Flaps/Slats on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To extend the flaps and slats at the same time.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-00-00-480-002
29-10-00-863-002
29-10-00-863-003
29-10-00-864-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Yellow Hydraulic System



EFF :
ALL
 27-50-00



AIJ




Page 205
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-003
29-23-00-860-001
29-23-00-860-002
31-60-00-860-001
31-60-00-860-002

Depressurize the Blue Hydraulic System


Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-50-00-941-063
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
and slat systems are in operation.
Subtask 27-50-00-860-065
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) If applicable, disconnect the Power Transfer Unit (PTU) (Ref. TASK
29-23-00-860-001).
NOTE : The flaps move at full-speed if the Power Transfer Unit (PTU)
____
is in operation. If the PTU is disconnected (electrically or
hydraulically), only the yellow flap motor operates and the
flaps move at half-speed.
NOTE : An ECAM F/CTL FLAP SYS 1 FAULT message will show when the PTU
____
is isolated. This message can be ignored.
(3) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).



EFF :
ALL
 27-50-00


R 
AIJ




Page 206
Feb 01/07

(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).


NOTE : The Blue and/or Green hydraulic system(s) operate(s) the slat
____
system. If necessary, use the alternative hydraulic system.
Subtask 27-50-00-865-069
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-50-00-865-071
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
4. Procedure
_________
Subtask 27-50-00-866-061
A. Extension of the Flaps/Slats on the Ground
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).



EFF :
ALL
 27-50-00


R 
AIJ




Page 207
Feb 01/07

(2) Set the flap/slat control lever to the applicable position 1, 2, 3 or


FULL.
(3) Make sure that on the ECAM upper DU:
- the flap position bar moves to the set position
- the slat position bar moves to the set position.
R
R

(4) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever (Ref. TASK 27-00-00480-002).
5. Close-up
________
Subtask 27-50-00-860-066
A. Aircraft Maintenance Configuration
(1) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864002).
(2) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(3) If applicable, connect the PTU (Ref. TASK 29-23-00-860-002).
(4) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-50-00-942-063
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00



AIJ




Page 208
Aug 01/07

TASK 27-50-00-866-011
Manual Extension of the Flaps
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
The manual extension of the flaps.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
460005835
98D27803000000
98D27804001000
98D27804011000

1
2
1
1
1

circuit breaker(s) safety clip(s)


pneumatic right-angle wrench
safety barriers
warning notice
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
SLEEVE - GROUND LOCK
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
ADAPTOR-DRIVE, SLAT (AND FLAP)
BAR-TURNING



EFF :
ALL
 27-50-00



AIJ




Page 209
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
R

27-50-00-866-009
27-54-45-000-002
31-32-00-860-006
32-12-00-010-001
27-50-00-991-005

Energize the Ground Service Network from the External


Power
Retraction of the Flaps on the Ground
Removal of the Torque Shaft 6204CM(6254CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Fig. 201

3. __________
Job Set-up
Subtask 27-50-00-941-060
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position on the panel 114VU to tell persons
not to operate the flap/slat controls.
Subtask 27-50-00-860-061
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.
(3) Energize the ground service network
(Ref. TASK 24-42-00-861-001).



EFF :
ALL
 27-50-00



AIJ




Page 210
May 01/11

(4) On the MCDU:


(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
- push the line key for <SFCC1(2)

On the MCDU:
- the MCDU shows the SFCC1(2) menu page
1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1(2) menu page


2.

3. Push the line key (2R) SYSTEM DATA - the MCDU shows the flap SYSTEM DATA
FLP>
submenu.
4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Record the APPU data.


Subtask 27-50-00-865-065
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-50-00-010-052
D. Get Access
(1) Open the applicable MLG door (Ref. TASK 32-12-00-010-001).
(2) Install the SLEEVE - GROUND LOCK on the applicable main gear door
actuator.
R
R

(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
torque shaft assy 6204CM (6254CM) in the MLG bay.



EFF :
ALL
 27-50-00



AIJ




Page 211
May 01/11

R
R

(4) Remove the torque shaft assy 6204CM (6254CM) (Ref. TASK 27-54-45-000002).
4. Procedure
_________
(Ref. Fig. 201/TASK 27-50-00-991-005)
Subtask 27-50-00-866-057
A. Manual Extension of the Flaps with Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

R
R

(1) Install the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) on the


right angle gearbox 6205CM (6255CM).
(2) Install the pneumatic right-angle wrench on the ADAPTOR-DRIVE, SLAT
(AND FLAP).
(3) Extend the flaps with the ADAPTOR-DRIVE, SLAT (AND FLAP) and
pneumatic right-angle wrench as necessary.
Subtask 27-50-00-866-059
B. Manual Extension of the Flaps without Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Install the BAR-TURNING (98D27804011000) on the flap drive shaft,
outboard of the right angle gearbox 6205CM (6255CM).

(2) Extend the flaps with the BAR-TURNING as necessary.



EFF :
ALL
 27-50-00



AIJ




Page 212
May 01/11

Flaps - Manual Extension/Retraction


Figure 201/TASK 27-50-00-991-005



EFF :
ALL
 27-50-00



AIJ




Page 213
May 01/11

TASK 27-50-00-866-009
Retraction of the Flaps on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To retract the flaps without movement of the slats. To retract the flaps and
slats at the same time (Ref. TASK 27-50-00-866-00901).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-00-00-080-002
29-10-00-863-002
29-10-00-864-002
31-60-00-860-001
31-60-00-860-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Pressurize the Yellow Hydraulic System
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure



EFF :
ALL
 27-50-00



AIJ




Page 214
Feb 01/07

3. __________
Job Set-up
Subtask 27-50-00-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
system is in operation.
Subtask 27-50-00-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-50-00-860-056
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
NOTE : The flaps move at full-speed if the Power Transfer Unit (PTU),
____
is in operation. If the PTU is isolated (electrically or
hydraulically) only the yellow flap motor operates and the
flaps move at half-speed.
NOTE : An ECAM F/CTL FLAP SYS 1 FAULT message will show when the PTU
____
is isolated. This message can be ignored.



EFF :
ALL
 27-50-00


R 
AIJ




Page 215
Feb 01/07

Subtask 27-50-00-865-058
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
Subtask 27-50-00-866-053
A. Retraction of the Flaps on the Ground
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002).
(3) Set the flap/slat control lever to position 0.
(4) Make sure that on the upper display unit of the ECAM system the flap
position bar moves to the set position.
5. Close-up
________
Subtask 27-50-00-860-057
A. Aircraft Configuration
(1) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864002).
(2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-50-00



AIJ




Page 216
Aug 01/07

Subtask 27-50-00-865-059
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-50-00-942-053
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 217
Feb 01/07

TASK 27-50-00-866-009- 01
Retraction of the Flaps/Slats on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
1. __________________
Reason for the Job
To retract the flaps and slats at the same time
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
98D27803000000

safety barriers
warning notice(s)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-00-00-080-002
27-00-00-480-002
29-10-00-863-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Pressurize the Yellow Hydraulic System



EFF :
ALL
 27-50-00



AIJ




Page 218
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-003
29-10-00-864-002
29-10-00-864-003
29-23-00-860-001
29-23-00-860-002
31-60-00-860-001
31-60-00-860-002

Pressurize the Blue Hydraulic System with a Ground


Power Supply
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-50-00-941-064
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
and slat systems are in operation.
R
R

(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is in position on the flap/slat control lever
(Ref. TASK 27-00-00-480-002).
Subtask 27-50-00-860-067
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) If applicable, disconnect the Power Transfer Unit (PTU) (Ref. TASK
29-23-00-860-001).
NOTE : The flaps move at full-speed if the Power Transfer Unit (PTU)
____
is in operation. If the PTU is disconnected (electrically or
hydraulically), only the yellow flap motor operates and the
flaps move at half-speed.



EFF :
ALL
 27-50-00



AIJ




Page 219
Aug 01/07

NOTE : An ECAM F/CTL FLAP SYS 1 FAULT message will show when the PTU
____
is isolated. This message can be ignored.
(3) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
NOTE : The Blue and/or Green hydraulic system(s) operate(s) the slat
____
system. If necessary, use the alternative hydraulic system.
Subtask 27-50-00-865-072
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-50-00-865-070
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-50-00-866-062
A. Retraction of the Flaps/Slats on the Ground
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-50-00


R 
AIJ




Page 220
Aug 01/07

R
R
R
R

CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.

(1) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002).
(3) Set the flap/slat control lever to the applicable position 3, 2, 1 or
0.

R
R
R

(4) Make sure that on the ECAM upper DU, the flap and slat position bar
moves to the set position.
5. Close-up
________
Subtask 27-50-00-860-068
A. Aircraft Maintenance Configuration
(1) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864002).
(2) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
(3) If applicable, connect the PTU (Ref. TASK 29-23-00-860-002).
(4) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-50-00-865-073
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14CC1, 14CC2



EFF :
ALL
 27-50-00



AIJ




Page 221
Aug 01/07

Subtask 27-50-00-942-064
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 222
Aug 01/07

TASK 27-50-00-866-012
Manual Retraction of the Flaps
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
460005835
98D27504005000
98D27804001000

1
2
1
1

pneumatic right-angle wrench


safety barriers
warning notice
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
SLEEVE - GROUND LOCK
PIN RIGGING-FLAPS (TRACK 1)
ADAPTOR-DRIVE, SLAT (AND FLAP)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-51-00-820-008
R
R

27-54-45-000-002
27-54-45-400-002
31-32-00-860-006
32-12-00-010-001

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Removal of the Torque Shaft 6204CM(6254CM)
Installation of the Torque Shaft 6204CM(6254CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access



EFF :
ALL
 27-50-00



AIJ




Page 223
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------32-12-00-410-001
27-50-00-991-006

Close the Main Gear Doors after Access


Fig. 202

3. __________
Job Set-up
Subtask 27-50-00-941-061
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position on the panel 114VU
to tell persons not to operate the flap/slat controls.
Subtask 27-50-00-860-062
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
attached to the flap/slat control lever on the panel 114VU.
(2) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00010-001).
(3) Make sure that the SLEEVE - GROUND LOCK is installed on the
applicable main gear door actuator.
(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position in the MLG bay.
R
R

(5) Make sure that the torque shaft assy 6204CM (6254CM) is removed
(Ref. TASK 27-54-45-000-002).
(6) Make sure that the ground service network is energized
(Ref. TASK 24-42-00-861-001).



EFF :
ALL
 27-50-00



AIJ




Page 224
May 01/11

Subtask 27-50-00-865-066
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
(Ref. Fig. 202/TASK 27-50-00-991-006)
Subtask 27-50-00-866-058
A. Manual Retraction of the Flaps with Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Fully retract the flaps with the ADAPTOR-DRIVE, SLAT (AND FLAP)
(98D27804001000) and the pneumatic right-angle wrench.
(2) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) at the track
1 rigging pin position. This will set the flaps to the zero degree
position.
(3) Remove the pneumatic right-angle wrench from the ADAPTOR-DRIVE, SLAT
(AND FLAP).
R
R

(4) Remove the ADAPTOR-DRIVE, SLAT (AND FLAP) from the right angle
gearbox 6205CM (6255CM).
Subtask 27-50-00-866-060
B. Manual Retraction of the Flaps without Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Fully retract the flaps with the BAR-TURNING.



EFF :
ALL
 27-50-00



AIJ




Page 225
May 01/11

R
R

Installation of the Flap Rigging Pin at Track 1


Figure 202/TASK 27-50-00-991-006



EFF :
ALL
 27-50-00



AIJ




Page 226
Feb 01/07

(2) Install the PIN RIGGING-FLAPS (TRACK 1) at the track 1 rigging pin
position. This will set the flaps to the zero degree position.
(3) Remove the BAR-TURNING from the flap drive shaft.
5. Close-up
________
Subtask 27-50-00-865-067
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV
Subtask 27-50-00-410-051
B. Close Access
R
R

(1) Install the torque shaft assy 6204CM (6254CM) (Ref. TASK 27-54-45400-002).
(2) Remove the PIN RIGGING-FLAPS (TRACK 1) from the track 1 rigging pin
position.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the access platform(s).
(5) Close the MLG doors (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-50-00



AIJ




Page 227
May 01/11

Subtask 27-50-00-860-063
C. Aircraft Configuration
(1) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
- push the line key for <SFCC1(2)

On the MCDU:
- the MCDU shows the SFCC1(2) menu page
1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1(2) menu page


2.

3. Push the line key (2L) SYSTEM DATA - the MCDU shows the flap SYSTEM DATA
FLP>
submenu.
4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Record the APPU data:


(2) Make sure that the PPU DATA shown is within 0.1 deg. of the value as
recorded before the manual extension.
(3) If the PPU DATA is not within 0.1 deg., do an adjustment of the flap
rigged position (Ref. TASK 27-51-00-820-008).
(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on the panel 114VU.
(5) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
Subtask 27-50-00-942-061
D. Close-up
(1) Remove the warning notice(s).
(2) Remove the safety barriers.



EFF :
ALL
 27-50-00



AIJ




Page 228
Feb 01/11

(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 229
Feb 01/07

TASK 27-50-00-866-010
Reset of the Torque Limiters of the Flap System on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices
1 ACCESS PLATFORM 4M (13 FT)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-54-00-710-001
29-10-00-863-002
29-10-00-864-002
57-51-37-000-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Flap System
Pressurize the Yellow Hydraulic System
Depressurize the Yellow Hydraulic System
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)



EFF :
ALL
 27-50-00



AIJ




Page 230
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-000-004
57-51-37-400-002
R
57-51-37-400-004
27-50-00-991-003

Removal of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 203

3. __________
Job Set-up
Subtask 27-50-00-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in position, to tell persons that the flap
system is in operation.
Subtask 27-50-00-860-058
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
NOTE : The flaps travel at full speed if the Power Transfer Unit
____
(PTU) is in operation. If the PTU is isolated (electrically or
hydraulically), only the Yellow flap motor operates and the
flaps travel at half speed.
NOTE : An ECAM F/CTL FLAP SYS 1 FAULT message will show when the PTU
____
is isolated. This message can be ignored.



EFF :
ALL
 27-50-00



AIJ




Page 231
Nov 01/10

Subtask 27-50-00-865-061
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-50-00-865-062
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-50-00-010-050
E. Get Access
R

(1) Put an ACCESS PLATFORM 4M (13 FT) in position, below the applicable
access panel.
(2) Remove the applicable access panel(s) to gain access to the torque
limiter(s):
(a) For the LH wing, remove the following panels:
1
_

For the flap track No.1 torque limiter:


- 193AB, 193BB
- 573BB (Ref. TASK 57-51-37-000-002).

2
_

For the flap track No.2 torque limiter:


- 573AB, 573BB (Ref. TASK 57-51-37-000-002).

3
_

For the flap track No.3 torque limiter:


- 575BB, 575CB (Ref. TASK 57-51-37-000-004).

4
_

For the flap track No.4 torque limiter:


- 575FB, 575GB (Ref. TASK 57-51-37-000-004).



EFF :
ALL
 27-50-00



AIJ




Page 232
Feb 01/11

(b) For the RH wing, remove the following panels:


1
_

For the flap track No.1 torque limiter:


- 194AB, 194BB
- 673BB (Ref. TASK 57-51-37-000-002).

2
_

For the flap track No.2 torque limiter:


- 673AB, 673BB (Ref. TASK 57-51-37-000-002).

3
_

For the flap track No.3 torque limiter:


- 675BB, 675CB (Ref. TASK 57-51-37-000-004).

4
_

For the flap track No.4 torque limiter:


- 675FB, 675GB (Ref. TASK 57-51-37-000-004).

4. Procedure
_________
R

(Ref. Fig. 203/TASK 27-50-00-991-003)


Subtask 27-50-00-866-055
A. Reset of the Torque Limiters of the Flap System on the Ground
(1) To release the load from the torque limiter(s) and allow the
indicators to be closed, do the step that follows:
(a) Put the slat/flap control lever to the last position that had
been set, before the torque limiter(s) operated.
(2) Remove the safety collar from the circuit breakers 10CV and 12CV.
Subtask 27-50-00-865-063
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07



EFF :
ALL
 27-50-00



AIJ




Page 233
Feb 01/07

R
R

Torque Limiters - Detail and Location


Figure 203/TASK 27-50-00-991-003



EFF :
ALL
 27-50-00



AIJ




Page 234
Feb 01/07

Subtask 27-50-00-866-056
C. Continue the Reset of the Torque Limiters
(1) Push each applicable indicator (1) down so that it aligns with the
torque limiter, in the usual system condition.
Subtask 27-50-00-710-051
D. Operational Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-50-00-860-059
A. Aircraft Configuration
(1) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864002).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-50-00-865-064
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07



EFF :
ALL
 27-50-00


R 
AIJ




Page 235
Feb 01/07

Subtask 27-50-00-410-050
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel(s):
(a) For the LH wing, install the following panels:
1
_

For the flap track No.1 torque limiter:


- 193AB, 193BB
- 573BB (Ref. TASK 57-51-37-400-002).

2
_

For the flap track No.2 torque limiter:


- 573AB, 573BB (Ref. TASK 57-51-37-400-002).

3
_

For the flap track No.3 torque limiter:


- 575BB, 575CB (Ref. TASK 57-51-37-400-004).

4
_

For the flap track No.4 torque limiter:


- 575FB, 575GB (Ref. TASK 57-51-37-400-004).

(b) For the RH wing, install the following panels:


1
_

For the flap track No.1 torque limiter:


- 194AB, 194BB
- 673BB (Ref. TASK 57-51-37-400-002).

2
_

For the flap track No.2 torque limiter:


- 673AB, 673BB (Ref. TASK 57-51-37-400-002).

3
_

For the flap track No.3 torque limiter:


- 675BB, 675CB (Ref. TASK 57-51-37-400-004).

4
_

For the flap track No.4 torque limiter:


- 675FB, 675GB (Ref. TASK 57-51-37-400-004).

Subtask 27-50-00-942-054
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-50-00


R 
AIJ




Page 236
Feb 01/07

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 237
Feb 01/07

TASK 27-50-00-400-002
Installation of the Inboard and Outboard Flap Hoisting-Sling
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No specific
No specific
No specific
98F27508498000

safety barriers
warning notice
2 HOIST 250 KG (551 LB), 6 M (19,7 FT) - LIFT
1 HOIST-R I,FLAP SLAT

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-011
27-50-00-991-001

Extension of the Flaps on the Ground


Manual Extension of the Flaps
Fig. 204



EFF :
ALL
 27-50-00



AIJ




Page 238
Nov 01/10

3. __________
Job Set-up
Subtask 27-50-00-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap/slat control lever.
Subtask 27-50-00-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are at the position 3 (Ref. TASK 27-50-00866-008) or (Ref. TASK 27-50-00-866-011).
4. Procedure
_________
(Ref. Fig. 204/TASK 27-50-00-991-001)
Subtask 27-50-00-480-051
A. Installation of the Inboard Flap Hoisting Sling
(1) Remove the blanking caps from the flap.
R
R

(2) Remove the pip-pins (11) and the lifting-lugs (12) from the HOIST-R
I,FLAP SLAT (98F27508498000).
(3) Install the lifting-lugs (12) in the flap.

R
R

(4) Attach the hoisting sling to the HOIST 250 KG (551 LB), 6 M (19,7 FT)
- LIFT.
NOTE : The inboard flap weighs 114 kg (251 lb).
____
(5) Use the hoist to put the hoisting sling in position above the flap.
(6) Lower the hoisting sling until you can attach it to the lifting-lugs
(12).
(7) Connect the hoisting sling to the lifting-lugs (12) with the forked
connections (10) and the pip-pins (11). If necessary, adjust the
turnbuckles (13) to get a correct lift angle of 20 degrees.



EFF :
ALL
 27-50-00



AIJ




Page 239
Nov 01/10

R
R

Hoisting Sling Details


Figure 204/TASK 27-50-00-991-001



EFF :
ALL
 27-50-00



AIJ




Page 240
Feb 01/07

Subtask 27-50-00-480-052
B. Installation of the Outboard Flap Hoisting Sling
(1) Remove the blanking caps from the flap.
R
R

(2) Remove the pip-pins (11) and the lifting-lugs (12) from the HOIST-R
I,FLAP SLAT (98F27508498000).
(3) Install the lifting-lugs (12) in the flap.

R
R

(4) Attach the hoisting sling to the HOIST 250 KG (551 LB), 6 M (19,7 FT)
- LIFT.
NOTE : The outboard flap weighs 125 kg (276 lb).
____
(5) Use the hoist to put the hoisting sling in position above the flap.
(6) Lower the sling until you can attach it to the lifting-lugs (12).
(7) Connect the hoisting sling to the lifting-lugs (12) with the forked
connections (10) and the pip-pins (11). If necessary, adjust the
turnbuckles (13) to get a correct lifting angle of 20 degrees.
5. Close-up
________
Subtask 27-50-00-942-057
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00



AIJ




Page 241
Nov 01/10

TASK 27-50-00-000-002
Removal of the Inboard and Outboard Flap Hoisting-Sling
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
98F27508498000

safety barriers
warning notice
1 HOIST-R I,FLAP SLAT

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-991-001

Fig. 204

3. __________
Job Set-up
Subtask 27-50-00-941-057
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat control lever.



EFF :
ALL
 27-50-00



AIJ




Page 242
Nov 01/10

4. Procedure
_________
(Ref. Fig. 204/TASK 27-50-00-991-001)
Subtask 27-50-00-080-051
A. Removal of the Inboard Flap Hoisting Sling
(1) Remove the pip-pins (11) and disconnect the hoisting sling from the
inboard flap.
(2) Remove the lifting-lugs (12) from the inboard flap and connect them
to the hoisting sling with the pip-pins (11).
R

(3) Remove the HOIST-R I,FLAP SLAT (98F27508498000) from the hoist.
(4) Install the blanking caps in the flap. Make sure that the top of the
blanking caps is not above the surface of the flap.
Subtask 27-50-00-080-052
B. Removal of the Outboard Flap Hoisting Sling
(1) Remove the pip-pins (11) and disconnect the hoisting sling from the
outboard flap.
(2) Remove the lifting-lugs (12) from the outboard flap and connect them
to the hoisting sling with the pip-pins (11).

(3) Remove the HOIST-R I,FLAP SLAT (98F27508498000) from the hoist.
(4) Install the blanking caps in the flap.
5. Close-up
________
Subtask 27-50-00-942-058
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00



AIJ




Page 243
Nov 01/10

TASK 27-50-00-400-003
Installation of the Lock-Torque Shaft - Flaps and Slats (98D27504030001)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
98D27504030001

safety barriers
warning notice
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-991-004

Fig. 205



R
EFF :
ALL
 27-50-00



AIJ




Page 244
Nov 01/08

3. __________
Job Set-up
Subtask 27-50-00-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position, on panel 114VU to tell persons not
to operate the flap/slat control lever.
4. Procedure
_________
(Ref. Fig. 205/TASK 27-50-00-991-004)
Subtask 27-50-00-480-050
R

A. Installation of the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)


(1) Make sure that the protective pads on the items that follow are in a
satisfactory condition.
- the arm assembly (10)
- the clamp (7)
- the pad (3)
- the pivot clamp (1).
(2) Loosen the screw (6).
(3) Remove the pin (5) and the clamp (7).
(4) Loosen the screw (9) sufficiently to let the clamp arm (8) move along
the arm assembly (10).
(5) Put the pivot clamp (1) in position on the flange of the wing
structure.
(6) Put the arm assembly (10) on the applicable torque shaft.
(7) Put the clamp (7) on the torque shaft below the arm assembly (10) and
install the pin (5). Do not tighten the screw (6) at this time.
(8) Move the pivot clamp (1) together with the arm assembly (10) until
the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is in the correct position.



EFF :
ALL
 27-50-00



AIJ




Page 245
Nov 01/08

INTENTIONALLY BLANK



R

 27-50-00



AIJ




Page 246
Nov 01/08

R
R

Lock-Torque Shaft (Flaps and Slats)


Figure 205/TASK 27-50-00-991-004



EFF :
ALL
 27-50-00



AIJ




Page 247
Feb 01/07

(9) Hold the pivot clamp (1) in position:


- for the left wing, tighten the screw (2)
- for the right wing, install the packer (4) and tighten the screw
(2).
(10) Tighten the screw (9).
(11) Tighten the screw (6) until the clamp (7) and the arm assembly (10)
lock the torque shaft in position.
5. Close-up
________
Subtask 27-50-00-942-059
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00


R 
AIJ




Page 248
Feb 01/07

TASK 27-50-00-000-003
Removal of the Lock-Torque Shaft - Flaps and Slats (98D27504030001)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-50-00-991-004

Fig. 205

3. __________
Job Set-up
Subtask 27-50-00-941-059
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position on panel 114VU to
tell persons not to operate the flap/slat control lever.



EFF :
ALL
 27-50-00



AIJ




Page 249
Feb 01/07

4. Procedure
_________
(Ref. Fig. 205/TASK 27-50-00-991-004)
Subtask 27-50-00-080-050
R

A. Removal of the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)


(1) Loosen the screw (6).
(2) Remove the pin (5) and the clamp (7).
(3) Loosen the screw (2). For the right wing, remove the packer (4).
(4) Remove the pivot clamp (1) from the wing structure and the arm
assembly (10) from the torque shaft.
(5) Put the clamp (7) and the arm assembly (10) together and install the
pin (5).
5. Close-up
________
Subtask 27-50-00-942-060
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00



AIJ




Page 250
Nov 01/08

TASK 27-50-00-869-006
Reset of the Wing Tip Brake (WTB) of the Flap System on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific
No specific

safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-010
27-54-00-710-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Torque Limiters of the Flap System on
the Ground
Operational Test of the Flap System
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply



EFF :
ALL
 27-50-00



AIJ




Page 251
Nov 01/08

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
31-32-00-860-006

Depressurize
Depressurize
Depressurize
Procedure to
F/CTL Page

the
the
the
Get

Green Hydraulic System


Yellow Hydraulic System
Blue Hydraulic System
Access to the SYSTEM REPORT/TEST

3. __________
Job Set-up
Subtask 27-50-00-941-062
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
system is in operation.
Subtask 27-50-00-865-068
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
R
Subtask 27-50-00-860-064
R

C. Aircraft Maintenance Configuration


WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.



EFF :
ALL
 27-50-00



AIJ




Page 252
Nov 01/08

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).


(2) Make sure that the Green, the Yellow and the Blue hydraulic systems
are depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00864-002) (Ref. TASK 29-10-00-864-003).
(3) Get access to the flight controls (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
4. Procedure
_________
Subtask 27-50-00-869-058
A. Reset the Wing Tip Brake with SFCC 1 and 2.
NOTE : Use any available MCDU to do the reset of the wing tip brake.
____
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Open the C/B 8CV.

- SFCC 2 is isolated.

2. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

3. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

4. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 FLAP


TEST/RESET menu.

5. Push the line key WTB-RESET >.

- the MCDU shows the SFCC 1 FLAP


WTB-RESET procedure.

6. Push the line key < START WTB


RESET.

- the MCDU shows: SFCC 1 FLAP WTB-RESET


PERFORMED.

7. If the reset of the WTB is not


performed and no SFCC fault is
displayed, do the steps that
follow:
- open the C/Bs 5CV, 6CV, 7CV,
9CV, 10CV, 11CV and 12CV.
- wait five seconds.



EFF :
ALL
 27-50-00



AIJ




Page 253
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- close the C/Bs 5CV, 6CV, 7CV,
9CV, 10CV, 11CV and 12CV.
- repeat steps 2 thru 6 again.
8. Close C/B 8CV.

- SFCC 2 is energized.

9. Open C/B 6CV.

- SFCC 1 is isolated.

10. On the MCDU:


- push the line key < SFCC 2.

On the MCDU:
- the MCDU shows the SFCC 2 menu.

11. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 2 menu.

12. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 2 FLAP


TEST/RESET menu.

13. Push the line key WTB-RESET >.

- the MCDU shows the SFCC 2 FLAP


WTB-RESET procedure.

14. Push the line key < START WTB


RESET.

- the MCDU shows: SFCC 2 FLAP WTB-RESET


PERFORMED.

15. If the reset of the WTB is not


performed and no SFCC fault is
displayed, do the steps that
follow:
- open the C/Bs 5CV, 7CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- wait five seconds.
- close the C/Bs 5CV, 7CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- repeat steps 10 thru 14 again.
16. Close C/B 6CV.
17. Push the line key < RETURN
frequently until the CFDS MENU
page is shown.



EFF :
ALL
 27-50-00


R 
AIJ




Page 254
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------18. Pressurize the Green, Yellow and
Blue hydraulic systems
(Ref. TASK 29-10-00-863-001),
(Ref. TASK 29-10-00-863-002),
(Ref. TASK 29-10-00-863-003).
19. Move the slat and flap control
lever in the flap extension and
retraction direction.
20. Check all the flap system torque
limiters and reset as necessary
(Ref. TASK 27-50-00-866-010).
5. Close-up
________
Subtask 27-50-00-710-052
A. Operational Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
Subtask 27-50-00-862-056
B. De-energize the Electrical Circuits
(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
R
Subtask 27-50-00-942-062
R

C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-50-00



AIJ




Page 255
Nov 01/08

FLAPS ELECTRICAL CONTROL AND MONITORING - DESCRIPTION AND OPERATION


___________________________________________________________________
1. General
_______
The electrical control and monitoring system of the flaps has:
- a manually operated slat/flap control lever
- a Command Sensor Unit (CSU) 51CV
- two Slat and Flap Control Computers (SFCC1 and SFCC2) 21CV, 22CV
- two electrically controlled valve blocks 23CV(24CV) installed on the flaps
Power Control Unit (PCU) 6201CM (Ref. 27-54-00)
- a Feedback Position Pick-Off Unit (FPPU) 27CV
- two Asymmetry Position Pick-Off Units (APPU) 29CV(30CV)
- two Wing Tip Brakes (WTB) 33CV(34CV)
- two flap interconnecting struts, each with two flap-attachment failure
detection sensors 37CV, 39CV (38CV, 40CV).
The functions of the flaps electrical control and monitoring system are:
- to control the valve blocks electrically
- to control the WTBs electrically
- to receive data from and send data to the related systems
- to monitor the power transmission for correct operation
- to monitor the control system and power transmission for component failure
- to monitor the inputs from and outputs to the related systems.
The slat/flap control lever controls the position of the flaps. The CSU
identifies the position of the slat/flap control lever and sends related
signals to each SFCC. Each SFCC controls a valve block of a hydraulic motor,
which is part of the flap PCU.
The two SFCCs monitor the operation of the transmission system. The FPPU
(which is part of the flaps PCU) and the two APPUs send signals to the
SFCCs. They identify component failures of the transmission system and the
control system. The Pressure-Off Brakes (POB) of the PCU and the WTBs stop
and hold the transmission system when a failure occurs.



EFF :
ALL
 27-51-00



AIJ




Page 1
Feb 01/07

2. Component
__________________
Location
(Ref. Fig. 001, 002, 003)
------------------------------------------------------------------------------FIN
I
FUNCTIONAL DESIGNATION
I PANELIZONEIACCESS I
ATA
I
I
I
I DOOR I
REF.
------------------------------------------------------------------------------SLAT AND FLAP CONTROL LEVER
114VU
27-51-43
21CV
SFCC1
85VU 127 824
27-51-34
22CV
SFCC2
86VU 128 824
27-51-34
23CV
PCU VALVE BLOCK 1
148
27-54-53
24CV
PCU VALVE BLOCK 2
148
27-54-53
27CV
FEEDBACK POSITION PICK-OFF UNIT
148
27-51-19
29CV
ASYMMETRY POSITION PICK-OFF UNIT
575 575FB
27-51-18
30CV
ASYMMETRY POSITION PICK-OFF UNIT
675 675FB
27-51-18
33CV
WING TIP BRAKE
575 575EB
27-51-51
34CV
WING TIP BRAKE
675 675EB
27-51-51
37CV
FLAP ATTACHMENT FAILURE DETECTION
580
SENSOR
38CV
FLAP ATTACHMENT FAILURE DETECTION
680
SENSOR
39CV
FLAP ATTACHMENT FAILURE DETECTION
580
SENSOR
40CV
FLAP ATTACHMENT FAILURE DETECTION
680
SENSOR
51CV
COMMAND SENSOR UNIT
114VU 220 811
27-51-17
91CV
RELAY
187VU 121
93CV
RELAY
188VU 122
95CV
RELAY
187VU 121
97CV
RELAY
188VU 122
3. __________________
System Description
A. Mechanical Input
The slat/flap control lever is installed in the cockpit on panel 114VU.
There are five possible positions for the lever (identified as 0,1,2,3
and FULL). The lever position to the related flight phase, flap angle and
the slat angle is as follows:



EFF :
ALL
 27-51-00


R 
AIJ




Page 2
Feb 01/07

Component Location
Figure 001


EFF :
ALL
 27-51-00



AIJ




Page 3
Feb 01/07

Component Location
Figure 002


EFF :
ALL
 27-51-00



AIJ




Page 4
Feb 01/07

Flap System Electrical Equipment - Component Location


Figure 003


EFF :
ALL
 27-51-00



AIJ




Page 5
Feb 01/07

------------------------------------------------------------------------------LEVER
FLAP
SLAT
POSITION
FLIGHT PHASE
ANGLE (deg) ANGLE (deg)
------------------------------------------------------------------------------0
Cruise
0
0
1*
Hold
0
18
1*
Take-off
10
18
2
Take-off
15
22
3
Take-off /Approach
20
22
FULL
Land
35
27
* Flap auto-command function
The slat/flap control lever has two baulks. One baulk between position 1
and 2, and one between position 3 and FULL. The baulks prevent a
one-movement-change of the lever position from FULL to 0. The lever turns
a shaft which moves the input shaft of the CSU through spur gears.
B. Electrical Control
(Ref. Fig. 004)
The CSU is installed in the cockpit, immediately below the slat and flap
control lever on the panel 114VU. The CSU changes the mechanical signals
from the control lever into electrical signals to the SFCC1 and SFCC2.
The two SFCCs are installed in racks in the forward avionics compartment.
The SFCCs have power supplies with no relation between them. Each SFCC
has the same function and includes one flap channel and one slat channel.
The flap channels each control one of the two valve blocks on the flaps
PCU. Each valve block has its own different hydraulic supply (Ref.
27-54-00).
There are three solenoid valves at each valve block. For the low speed
mode, the SFCCs energize the retract/extend solenoid valves and the POB
solenoid. For the high speed mode, the SFCCs energize the extend solenoid
valve and the POB solenoid. The POB solenoid permits the release of the
POB of the hydraulic motor (Ref. 27-84-00).
An FPPU, which is attached to the PCU, sends signals on the position of
the flap transmission to the two SFCCs. The PCU gearbox moves the FPPU.
The FPPU has two synchro transmitters, which are the same. One sends
signals to the SFCC1, the other one to the SFCC2.



EFF :
ALL
 27-51-00



AIJ




Page 6
Feb 01/07

Flaps Electrical Control - Schematic


Figure 004


EFF :
ALL
 27-51-00



AIJ




Page 7
Feb 01/07

C. Wing Tip Brake (WTB) Control


(Ref. Fig. 005)
The WTB is an electro-hydraulic pressure-on brake. It is installed near
the end of the transmission system in each wing. The WTBs stop and hold
the transmission if the SFCCs find some given types of failures. Each WTB
has two solenoid valves. Each solenoid valve controls one part of a WTB.
The hydraulic supply to each WTB is as follows:
- the Blue and Yellow systems supply the left WTB
- the Blue and Green systems supply the right WTB.
The two battery buses (701PP for system 1 and 702PP for system 2) supply
power to the WTB solenoids through the SFCCs. This makes sure that power
is available to the WTB if there is an engine power failure. Each busbar
supplies one solenoid on each WTB. When the solenoids are energized, the
system latches the circuit to keep the solenoid valves open. When the
WTBs operate, the transmission locks. The circuit can only be set back
(reset) on the ground through the Centralized Fault Display System
(CFDS).
The two SFCCs control the LH and the RH WTB. Each SFCC controls one
solenoid on each WTB.
D. Monitoring
(Ref. Fig. 006)
The two SFCCs monitor the flap system continuously for failures in:
- the operation of the power transmission system
- the Line Replaceable Units (LRU)
- the input and output signals
- the power supplies.
Failures in the flap system will not give, but may lead to class 1 level
3 warnings which are generated by the Electronic Centralized Aircraft
Monitoring (ECAM) system.
The ECAM system shows class 1, level 1 and level 2 cautions to the flight
crew (Ref. 31-50-00). The SFCCs supply failure data to the ECAM system
through:
- the System Data Acquisition Concentrators (SDAC) (Ref. 31-55-00)
- the Flight Warning Computers (FWC) (Ref. 31-53-00)
- the Display Management Computers (DMC) (Ref. 31-62-00).
The ECAM gives a Maintenance Status Reminder for class 2 failures.



EFF :
ALL
 27-51-00



AIJ




Page 8
Feb 01/07

Wing Tip Brake (WTB) Control - Schematic


Figure 005


EFF :
ALL
 27-51-00



AIJ




Page 9
Feb 01/07

Flap Transmission Monitoring - Schematic


Figure 006


EFF :
ALL
 27-51-00



AIJ




Page 10
Feb 01/07

The SFCCs supply all the related data of failures to the Centralized
Fault Display System (CFDS).
(1) Monitoring of the Power Transmission Systems
The SFCCs monitor the power transmission system for these failures:
- asymmetry (a position difference between the two APPUs)
- runaway (a position difference between the APPUs and the FPPU)
- uncommanded movement (a movement in the wrong direction, or
movement away from the last set position)
- overspeed (the faster movement of one or more PPUs)
- flap disconnect
- system jam
- half speed
- low hydraulic pressure
- control valve position.
To monitor the power transmission system, the SFCCs compare the CSU
signals with the position data. The SFCCs receive the position data
from:
- the two APPUs
- the FPPU
- the valve blocks
- the flap-attachment failure detection sensors.
An APPU is installed at the end of the transmission system in each
wing. The APPUs are the same as, and interchangeable with, the FPPU.
One synchro transmitter in each APPU sends position data to the
SFCC1. The other synchro transmitter in each APPU sends position data
to the SFCC2.
The control valve of each valve block has a Linear Variable
Differential Transducer (LVDT) (Ref. 27-54-00). The LVDT sends valve
position data to its related SFCC. The position of the valve is
directly related to the hydraulic pressure available at the valve
block.
An interconnecting strut connects the inboard and the outboard flaps.
It has two flap-attachment failure detection sensors. The
flap-attachment failure detection sensors monitor the connected flaps
for a position difference out of the specified limits.
Each flap-attachment failure detection sensor sends a signal to one
of the two Landing Gear Control and Interface Units (LGCIU). Each
LGCIU gets a signal from one sensor on each wing and sends the data
to its related SFCC. The SFCC monitors the data and sends it to the



EFF :
ALL
 27-51-00



AIJ




Page 11
Feb 01/07

other SFCC through the cross-computer link. The SFCCs receive data
from all four flap-attachment failure detection sensors.
(2) LRU Monitoring
The SFCCs monitor these LRUs for failures:
- SFCC1 and SFCC2
- the CSU
- the two WTBs
- the two APPUs
- the FPPU
- the valve blocks of the flap PCU
- the flap disconnect sensors
- the hydraulic motors.
The SFCCs keep the data related to the failures in their memories.
(3) Monitoring of Input and Output Signals
The SFCCs monitor these input and output signals:
- the ARINC 429 inputs from other systems
- the ARINC 429 inputs from the cross-computer link (other SFCC)
- the installation coding
- the operation mode codings
- the ground inhibit
- the ARINC 429 outputs (wraparound)
If the obove signals are not in the specified limits, the SFCCs keep
the data related to the failure in its memory. The SFCCs transmit the
data to the CFDS.
Other discrete inputs are:
- the Aircraft On Ground (AOG) discrete
- the WTB-arm input.
(4) Monitoring of Power Supplies
The SFCCs monitor these power supplies:
- the SFCC DC Supply
- the WTB DC Supply
- the synchro excitation power generated by the SFCCs
- the LVDT synchro excitation power generated by the SFCCs.
If the voltage is not in the specified limits, the SFCCs keep the
data related to the failure in its memory.



EFF :
ALL
 27-51-00



AIJ




Page 12
Feb 01/07

The SFCCs transmit the data to the CFDS. If the SFCC DC supply or the
synchro excitation power is not in the specified limits, the flight
crew get a failure indication.
4. Power
____________
Supply
(Ref. Fig. 007)
The electrical power supplies for the flap control and monitoring system
are:
- the essential bus 401PP
- the normal bus 204PP
- the battery buses 701PP and 702PP.
The essential bus 401PP supplies:
- the SFCC1 flap channel
- the related PCU solenoids
- the synchro and LVDT excitation voltages.
The battery bus 701PP supplies the WTB solenoids related to the SFCC1.
The normal bus 204PP supplies:
- the SFCC2 flap channel
- the related PCU solenoids
- the synchro and LVDT excitation voltages.
The battery bus 702PP supplies the WTB solenoids related to the SFCC2.
If the WTBs are operated, the battery buses keep the solenoids energized
during a SFCC power failure.
5. __________
Interfaces
(Ref. Fig. 008, 009, 010)
The SFCCs send and receive discrete and analog electrical signals to and
from the components of the flap system. Each SFCC has an ARINC 429
interface, which connects it to the other systems.
6. Component
_____________________
Description
(Ref. Fig. 011)
A. Slat/Flap Control Lever
The slat/flap control lever has:
- an attachment plate
- a housing
- a lever assembly
- a five-position gate.



EFF :
ALL
 27-51-00



AIJ




Page 13
Feb 01/07

The rectangular attachment plate has a slot for the movement of the lever
assembly and connects to the center pedestal and the housing.
The housing contains:
- the CSU
- the lever assembly
- a pinnion
- a five-position gate.
The lever assembly has a spring-loaded plunger, a quadrant that connects
to the pinnion and a knob with a collar. A pin at the lower end of the
spring-loaded plunger engages in one of the notches of the five-position
gate.
A baulk above the second and forth notches of the five-position gate
stops a one-movement change of the lever position (from the 0 position to
the FULL position).
When the collar is lifted (against the pressure of the spring-loaded
plunger) the pin comes clear of the notch of the five-position gate. To
move the lever past the baulk, the collar must be released.
As the lever moves from one position to the next the quadrant turns the
pinnion. The pinnion (which has a splined shaft with one spline uncut to
give a master spline) turns the rotary switch of the CSU.
B. Command Sensor Unit
(Ref. Fig. 012, 013)
The CSU is a sealed unit which changes the mechanical signals from the
slat/flap control lever to electrical signals.
The CSU has:
- a housing
- a drive shaft
- four rotary switches
- a friction brake
- two electrical connectors.
The drive shaft has external splines, with one spline removed to give a
master spline. There are two zero-marks, one on the end of the drive
shaft and one on the housing. When the zero-marks are aligned, the CSU is
at mechanical zero. The drive shaft has a drive-gear which engages with
the input gears of the rotary switches.



EFF :
ALL
 27-51-00



AIJ




Page 14
Feb 01/07

Power Supply Distribution - Schematic


Figure 007

EFF :
ALL
 27-51-00




AIJ




Page 15/16
Feb 01/07

Flap System Components - Interfaces


Figure 008


EFF :
ALL
 27-51-00



AIJ




Page 17
Feb 01/07

Flap System Interfaces - Data to other Systems


Figure 009


EFF :
ALL
 27-51-00



AIJ




Page 18
Feb 01/07

Flap System Interfaces - Data from other Systems


Figure 010


EFF :
ALL
 27-51-00



AIJ




Page 19
Feb 01/07

Flap/Slat Control Lever


Figure 011


EFF :
ALL
 27-51-00



AIJ




Page 20
Feb 01/07

Command Sensor Unit


Figure 012


EFF :
ALL
 27-51-00



AIJ




Page 21
Feb 01/07

Command Sensor Unit - Schematic


Figure 013


EFF :
ALL
 27-51-00



AIJ




Page 22
Feb 01/07

When the drive shaft turns, the four rotary switches are operated at the
same time. Each rotary switch has a shaft with two sets of five tracks.
The tracks give the same switching patterns as the switches turn. Each
set of tracks has five detent patterns and four out-of-detent patterns.
The sliding contact connects two adjacent tracks to return for the detent
patterns. For the out-of-detent patterns, the sliding contact connects
only one of tracks 2, 3, 4 or 5 to return (Ref. Table 1).
The friction brake has a spring-loaded friction disc pack installed on
the drive shaft of the CSU.
The friction brake has two functions:
- to hold the CSU in the last set position after a drive shaft failure
- to apply friction to the drive shaft.
The rotary switches connect to two electrical connectors. Signals from
one set of tracks on each switch go to connector A. Signals from the
other set of tracks go to connector B.
Switch Patterns
--------------------------------------------------DETENT
1
2
3
4
5
---------------------------------------------------TRACK 1
XXXX
XXXX
---------------------------------------------------TRACK 2
XXXXXXXXX
---------------------------------------------------TRACK 3
XXXXXXXXX
---------------------------------------------------TRACK 4
XXXXXXXXX
---------------------------------------------------TRACK 5
XXXXXXXXX
---------------------------------------------------OUT-OF-DETENT
1
2
3
4
---------------------------------------------------Table 1
C. Slat and Flap Control Computer
(Ref. Fig. 014, 015)
ARINC 600 5 MCU cases contain the SFCC1 and the SFCC2. Each computer is
the same and has two channels, one for the slats, the other one for the
flaps. Each channel has two lanes (lane ONE and lane TWO) and include:
- one Power Supply Unit (PSU)
- one lane ONE Processor/Input Module
- one lane TWO Processor Module
- one ARINC/Synchro Module



EFF :
ALL
 27-51-00


R 
AIJ




Page 23
Feb 01/07

Slat and Flap Control Computer


Figure 014


EFF :
ALL
 27-51-00



AIJ




Page 24
Feb 01/07

Slat and Flat Control Computer - Schematic


Figure 015


EFF :
ALL
 27-51-00



AIJ




Page 25
Feb 01/07

- one Output Module.


The slat and flap channels together, have one common services module.
Each channel has its own 28V DC power unit. One 28V DC input supplies the
two PSUs which have no relation between them. Each PSU supplies its
channel with the necessary internal voltages.
The two lanes in each channel have different hardware and software:
- lane ONE has an INTEL 80C186 microprocessor (software programmed in
assembler language)
- lane TWO has a MOTOROLA 68HC000 microprocessor (software programmed in
Pascal language).
The ARINC/Synchro Module has two functions:
- ARINC 429 Communications
- Synchro to digital conversion.
The Output Module has three functions:
- to collect and make an analysis of the data from lanes ONE and TWO
- output data to the related valve blocks
- move data between lanes ONE and TWO through the dual-ported Random
Access Memory (RAM) and a common non-volatile store (EPROM).
The Common Services Module supplies:
- cross-channel communications through the RAM
- WTB logic
- system bus arbitration
- LVDT oscillator.
Each SFCC channel has an Installation-Coding input and an Operation
Mode-Coding input. The Installation-Coding enables the SFCC to identify
position 1 or 2 installation. The Operation Mode-Coding lets each channel
find the difference between the operation modes related to aircraft
versions:
- the flap operation mode 1 (relief enabled)
- the flap operation mode 2 (relief disabled)
- the slat operation mode 1 (Ref. 27-81-00)
- the slat operation mode 2 (Ref. 27-81-00).
The flap operation modes 1 and 2 are related to the flap relief function.
This function operates when the aircraft is at the flap relief speed. At
this speed the flap relief function signals the flaps to retract a small
amount to prevent too much load on the flaps. Because the flap loads are
less than the maximum permitted loads, all aircraft are in the flap
operation mode 2 (relief disabled). Pin programming disables/enables the
flap relief function.



EFF :
ALL
 27-51-00


R 
AIJ




Page 26
Feb 01/07

D. Valve Block
(Ref. Fig. 016)
The valve block is a sub-component of the flaps PCU specified in (Ref.
27-54-00).
E. Feedback Position Pick-Off Unit (FPPU)
(Ref. Fig. 017)
The FPPU has:
- a splined input shaft
- a spring-loaded locking plate
- the reduction gears
- a reduction gear housing
- two synchro transmitters which work independently
- a synchro cover
- an electrical connector block
- a cover plate.
The spring-loaded locking plate holds the splined input shaft from the
removed FPPU. When the FPPU is installed in the aircraft, the mount of
the FPPU pushes the locking plate away from the shaft splines. The input
shaft moves the reduction gears which are in the reduction gear housing.
The reduction gears turn the two synchro transmitters which are below the
synchro cover.
The electrical connector block is installed on the reduction gear
housing. The electrical connector block has two connectors, one for each
synchro transmitter. The connectors are identified as A and B. The cover
plate is installed on the reduction gear housing. There is a window in
the cover plate to monitor adjustment of the FPPU to zero.
When the input shaft turns through 140 revolutions it gives 360 deg.
synchro transmitter output. For full travel of the flaps, the angular
output of each syncro transmitter is 251.97 deg.
To adjust the FPPU electrically to zero, no electrical test equipment is
necessary.
For zero adjustment, there are three moving and three fixed indicators:
- two fixed pointers on the reduction gear housing
- one zero mark on the driving gear
- one orange zero indicator
- one fixed zero mark on the input shaft locking plate
- one zero mark on the end of the input shaft.



EFF :
ALL
 27-51-00



AIJ




Page 27
Feb 01/07

Valve Block
Figure 016


EFF :
ALL
 27-51-00



AIJ




Page 28
Feb 01/07

Feedback Position Pick-Off Unit (FPPU)


Figure 017


EFF :
ALL
 27-51-00



AIJ




Page 29
Feb 01/07

F. Asymmetry Position Pick-Off Unit (APPU)


(Ref. Fig. 018)
The two APPUs are the same as and interchangeable with the FPPU.
G. Wing Tip Brake
(Ref. Fig. 019)
The WTB is an electro-hydraulic, pressure-on disc-brake. The WTB has:
- a central housing
- a friction disc pack
- a through torque shaft
- two hydraulic manifolds
- two annular pistons
- two solenoid valves
- two electrical connectors.
The central housing contains the friction disc pack which has an
alternate stator and rotor discs. The central housing holds the stator
discs, external splines on the torque shaft drive the rotor discs. The
internal splines at each end of the torque shaft engage with the flap
transmission system. At each end of the central housing is a hydraulic
manifold which contains an annular piston. The torque shaft passes
through the center of the two pistons. A solenoid valve and an electrical
connector are installed on each manifold.
A special hydraulic system supplies each hydraulic manifold. The solenoid
valves control the supply of fluid pressure to the pistons.
When the solenoids are energized, the fluid pressure moves the piston to
release the spring force and puts the brake on. When the solenoids are
de-energized, the fluid pressure returns through the solenoid valves and
lets the brake off.
Leakage of fluid past the piston seals returns through a drilled hole. If
hydraulic pressure is not available to one piston, the remaining piston
gives sufficient force to act against the spring to let the brake off.
H. Flap Interconnecting Strut
(Ref. Fig. 020)
The flap interconnecting strut has these functions:
- it lets the inner and the outer flaps move independently by a specified
limit



EFF :
ALL
 27-51-00



AIJ




Page 30
Feb 01/07

Asymmetry Position Pick-Off Unit (APPU)


Figure 018


EFF :
ALL
 27-51-00



AIJ




Page 31
Feb 01/07

Wing Tip Brake


Figure 019


EFF :
ALL
 27-51-00



AIJ




Page 32
Feb 01/07

Flap Interconnecting Strut


Figure 020


EFF :
ALL
 27-51-00



AIJ




Page 33
Feb 01/07

- it gives a different load path for the flap drive system if there is an
attachment failure
- it sends data to the SFCC when the independent movement of the inner
and outer flaps is more than the specified limit
- it absorbs energy if a flap drive disconnect occurs.
The flap interconnecting strut has:
- a housing
- two flap-attachment failure detection sensors
- an actuating rod
- a target
- a ball piece
- a sleeve.
The housing contains the actuating rod, the sleeve and the ball piece.
The target is at the end of the actuating rod. The two sensors on the
housing align with the targets on the actuating rod, with the flaps in
their normal postion.
The actuating rod has a total travel of 18 mm (0.7086 in.) in each
direction from the center position. The limit of independent movement
between the flaps is 14.5 mm (0.5708 in.). The sensors send a target-far
signal to the LGCIU if the target moves more than 15 mm (0.5905 in.) from
the center position.
7. Operation/Control
________________________________
and Indicating
(Ref. Fig. 021)
A. Normal Operation
(1) System Configuration
For normal operation of the flaps:
- energize the aircraft electrical network
- close the circuit breakers 6CV, 8CV, 10CV and 12CV
- pressurize the Green hydraulic system for flap system 1 and the
Yellow hydraulic system for flap system 2.
NOTE : For safety, the circuit breakers 10CV and 12CV have a red
____
guard installed to prevent incorrect operation during flight.
To open the circuit breakers it is necessary to remove the
applicable red guard first.



EFF :
ALL
 27-51-00



AIJ




Page 34
Feb 01/07

Flaps - Normal Operation


Figure 021


EFF :
ALL
 27-51-00



AIJ




Page 35
Feb 01/07

(2) Manual Control


The slat and flap control lever controls the position of the flaps.
When the slat and flap control lever is moved to a new position, the
flaps move to the indicated flap angle.
NOTE : The flaps may move when the slat and flap lever moves from
____
position 0 to 1 or 1 to 0.
Depending on the CAS from the ADIRU.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

(3) Electrical Control


The CSU sends discrete signals to the flap channel of each SFCC. At
the same time, the CSU sends discrete signals for the slat position
to the slat channel. The switch pattern of the CSU changes when the
control lever moves. This causes the SFCC to get different signals
(Ref. Table 2). Each flap channel receives signals from two sets of
the 5-track switches in the CSU. For a correct signal, each channel
must receive the same detent pattern from the two sets of switches.
For a permitted out-of-detent pattern, each channel must receive the
same out-of-detent pattern from the two sets of switches.
If a different configuration occurs, it is a CSU failure.
Lever Position and Switch Pattern
------------------------------------------------------------------------------LEVER
POSITION
0
1
2
3
FULL
------------------------------------------------------------------------------TRACK 1
XXXXX
XXXXX
TRACK 2
XXXXXXXXXXX
TRACK 3
XXXXXXXXXX
TRACK 4
XXXXXXXXXXX
TRACK 5
XXXXXXXXXXXXX
------------------------------------------------------------------------------SLAT ANGLE
0
18
22
22
27
------------------------------------------------------------------------------FLAP ANGLE
0
10
15
20
35
------------------------------------------------------------------------------Table 2
The SFCC memory keeps the last correct signal, which controls the
slat and flap position. The SFCCs compare a new CSU signal with the
flap position signal which comes from the FPPU. If a change of flap

R
R
R



EFF :
ALL
 27-51-00



AIJ




Page 36
Nov 01/10

R
R
R

angle is necessary, the PCU solenoids get electrical power. The flaps
move towards the new position (Ref. 27-54-00). When the position data
from the FPPU is the same as the CSU signal, the flaps stop.

R
R
R
R
R
R

NOTE : Slat and flap movement always obeys the last correct control
____
lever movement. For example, when the lever moves from
position 3 to FULL, the flaps will extend in the direction of
the FULL position. If the lever returns to position 3 before
the flaps reach position FULL, the direction of flap movement
changes and the flaps move back to position 3.

R
(4) Flap Auto-Command Function
Two flap configurations, which are dependent on the airspeed, are
possible with the slat and flap control lever at the position 1 (ECAM
indication 1 or 1 + F).
The configurations are related to the Computed Air Speed (CAS) and
the lever position (0 or 2) before the lever is set to the position
1.
In the 10 deg configuration, the flaps retract automatically to 0 deg
if the CAS is equal to or more than 210 knots. After the automatic
retraction, the flaps will not extend (to configuration 1 + F) until
the CAS is equal to or less than 100 knots.
---------------------------------------------------------------------------LEVER POSITION
CAS
FLAP
MOVED FROM
(KNOTS)
CONFIGURATION
---------------------------------------------------------------------------Full, 3, 2 to 1
equal to or more than 210
0 deg.
Full, 3, 2 to 1
less than 210
10 deg.
0 to 1
more than 100
0 deg.
0 to 1
equal to or less than 100
10 deg.
(configuration 1 + F)
B. Operation of the Wing Tip Brake
(Ref. Fig. 022)
The WTBs lock the transmission system if a failure occurs.
(1) If one or the other lane of the flap channel finds a failure:
- the lane arms its own WTB circuits
- the other channel receives a WTB-arm discrete signal.
(2) If one or the other lane in the second flap channel also finds the
failure:
- the lane arms its own WTB circuits
- the first channel receives a WTB-arm discrete signal.



EFF :
ALL
 27-51-00



AIJ




Page 37
Nov 01/10

Wing Tip Brake Logic


Figure 022


EFF :
ALL
 27-51-00



AIJ




Page 38
Feb 01/07

When the SFCCs receive a WTB-arm signal they energize the related WTB
solenoid valves. The WTBs lock the transmission system.
If one SFCC does not operate, the other SFCC receives a WTB-arm
signal automatically. If the other SFCC finds a failure, one solenoid
valve on each WTB gets electrical power.
(3) Reset
The WTB can only be reset on the ground through the CFDS.
C. Monitoring for Failure Conditions
(1) Monitoring of the Power Transmission System
(Ref. Fig. 006)
The SFCCs monitor:
- the flap position data from the APPUs and the FPPU
- the rate of change of the flap position data
- the set position from the CSU.
The SFCCs use this data to find:
- an asymmetry
- a runaway
- an uncommanded movement
- an overspeed.
When the SFCCs find any one of these failures:
- the valve block solenoids on the PCU are de-energized
- the POBs are applied and stop their related hydraulic motors
- each channel arms its own WTB circuits and sends a WTB-arm signal
to the other channel
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display unit
shows a failure message.
When the WTBs have locked the system, reset is only possible on the
ground.
(2) Flap-Attachment Failure Detection Sensors
The SFCCs monitor the flap-attachment failure detection sensors to
find connection failure. If the SFCCs receive a flap disconnect
signal:
- the valve block solenoids on the PCU are de-energized
- the POBs lock the two hydraulic motors
- the SFCCs give a class 1 level 2 caution and the ECAM display unit
shows a failure message.



EFF :
ALL
 27-51-00


R 
AIJ




Page 39
Feb 01/07

System reset is only possible on the ground.


The ECAM display unit shows a failure message if:
- the SFCC gets different data from the two sensors on the same wing
or
- one sensor gives incorrect data.
(3) System Jam
The SFCC will find a system jam if the system speed is below 2%
nominal for more than 4 seconds.
When the SFCCs find a system jam:
- the valve block solenoids on the PCU are de-energized
- the POBs are applied and stop their related hydraulic motors
- the SFCCs give a class 1 level 2 caution and the ECAM display unit
shows a failure message.
If the SFCCs receive a new correct CSU signal, the SFCCs go back to
their normal operation.
If there is low hydraulic pressure, the SFCCs stop system jam
monitoring.
(4) LRU Monitoring
(a) SFCC1 and SFCC2
Each lane of each flap channel receives output signals from the
other lane in the same channel. Each lane compares these signals
with its own output signals. If there is a difference for more
than 320 milliseconds and minor failure steps are taken:
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the other channel receives a WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
If the failure resets in 5 seconds, the channel returns to its
normal operation. The SFCCs cancel the caution and the WTB-arm
signal. If the failure is still there after 5 seconds then a
major failure step is taken:
- the SFCC arms the WTB for the defective channel.
The major failure step is also taken if 10 minor failures occur
within 3 minutes.



EFF :
ALL
 27-51-00


R 
AIJ




Page 40
Feb 01/07

If there is a failure in the two flap channels:


- the solenoids on the two valve blocks are de-energized
- the POBs lock their related hydraulic motor
- the WTB for the two channels lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message
- the flaps do not operate until reset on the ground.
(b) CSU
The SFCCs monitor the CSU signals for the correct detent or
out-of-detent switch patterns.
If the SFCCs receive an incorrect pattern for more than 0.5
seconds:
- the solenoids on the related valve block are de-energized.
- the POBs lock their related hydraulic motor
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message.
If the SFCCs receive an out-of-detent pattern for more than 10
seconds:
- the SFCCs give a class 1 level 2 caution after the flaps are at
the last set position
- the ECAM display unit shows a failure message.
If a CSU disadjust failure is detected:
- the solenoids on the two valve blocks are de-energized
- the POBs lock their related hydraulic motor
- each channel arms its own WTB and sends a WTB-arm signal to the
other channel
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message
- the flaps do not operate until reset on the ground.
(c) WTB
Each flap channel monitors its related WTB solenoids for open
circuit or short circuit when the WTB is not electrically
energized. If there is a failure with the correct WTB power
available:
- the ECAM display unit shows a failure message.



EFF :
ALL
 27-51-00


R 
AIJ




Page 41
Feb 01/07

(d) PPU
If one flap channel finds failures (asymmetry, runaway, overspeed
or uncommanded movement), but does not receive the WTB-arm signal
from the other channel:
- the SFCCs will find a failure in one synchro of the related PPU
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the related channel arms its WTB
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
(e) Valve Blocks
1
_

LVDT
Each flap channel monitors its related LVDT for the correct
operation. If there is a failure, the SFCCs memory keeps the
related data and sends it to the CFDS. If the failure stops
the operation of the motor:
- the SFCCs give a class 1 level 1 caution and the ECAM
display unit shows a failure message
- the flaps operate at half speed.

2
_

Solenoid Valves
Each flap channel monitors the position of the solenoid valves
on its related valve block. The flap channels use the signals
from the LVDT to compare the position of the control valve
with the signals to the motor. If a valve does not close after
a signal:
- the channel will not try to drive the motor when the SFCC
gets DC power
- the SFCCs give a class 1 level 1 caution and the ECAM
display unit shows a failure message
- the flaps operate at half speed.

3
_

Hydraulic Pressure
Each flap channel monitors the hydraulic pressure available to
move its related motor. It uses signals from the LVDT to
compare the position of the control valve with the signals to
the motor (Ref. 27-54-00).
If there is low pressure:



EFF :
ALL
 27-51-00


R 
AIJ




Page 42
Feb 01/07

- the SFCCs give a class 1 level 1 caution and the ECAM


display unit shows a failure message
- the flaps operate at half speed.
When hydraulic pressure goes back to its normal condition:
- the SFCCs and the ECAM system cancel the class 1 level 1
caution and the failure message
- the flaps operate at normal speed.
If there is low pressure, the SFCCs stop system jam
monitoring.
(f) Hydraulic Motors
Each flap channel monitors the transmission system for half speed
operation when there is a hydraulic motor jam. The half speed
monitor operates only when the valves of the two valve blocks are
in the full speed position. If the flap movement is slower than
the minimum speed for two-motor operation:
- the SFCCs give a class 1 level 1 caution after 8 seconds and
the ECAM display unit shows a failure message
- the flaps operate at half speed.
When the aircraft is on the ground, half speed monitoring stops.
(5) Monitoring of Input and Output Signals
(a) ARINC 429 Inputs from other Systems
Each flap channel monitors ARINC 429 inputs from:
- the Landing Gear Control Interface Unit (LGCIU)
- the Air Data/Inertial Reference Unit (ADIRU)
- the Centralized Fault Display Interface Unit (CFDIU).
Incorrect data or no data does not stop the normal flap
operation. If there is no data for more than 10 seconds in
flight, the CFDS gets a failure message.
(b) ARINC 429 Input from Cross-Computer Link
Each flap channel monitors the other flap channel for the correct
operation. If there is no data for more than 10 seconds in
flight, the CFDS gets a failure message.



EFF :
ALL
 27-51-00


R 
AIJ




Page 43
Feb 01/07

(c) Installation Coding


Each flap channel monitors its installation code inputs. If they
find an incorrect coding:
- all ARINC 429 outputs, for that channel, change to no computed
data
- the CFDS gets a failure message.
(d) Operation Mode Coding
Each flap channel monitors its operation mode coding inputs. If
they find an incorrect coding:
- the ARINC 429 slat and flap system status changes to no
computed data
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the related channel arms its WTB
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
If the channel receives the WTB-arm signal from the other
channel:
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message.
Reset is only possible on the ground.
(e) System Ground Operation Inhibit
The System Ground Operation Inhibit (SGOI) prevents flap system 2
operation during cargo door operation.
The SFCC 2 gets a SGOI signal when the Yellow hydraulic system is
pressurized and the FWD or AFT cargo doors are operated.
When the manual selector 2501MJ or 2504MJ is switched to FWD/AFT
cargo door open or closed, the relay 3811GX transmits a SGOI
signal to the flap channel of the SFCC 2.
If the SFCC 2 detects a SGOI condition on the ground when the
flap system 2 is in operation, it:
- performs a shutdown of the PCU valve block (Yellow hydraulic
system)
- inhibits further PCU valve block operation



EFF :
ALL
 27-51-00


R 
AIJ




Page 44
Feb 01/07

- transmits a warning signal to the Flight Warning Computor (FWC)


and on the Engine Warning Display (EWD) shows a FLAP SYS 2
FAULT
- will put a message in the SFCC 2 flap channel.
If the SFCC 2 detects a SGOI condition on the ground when the
flap system 2 is not in operation, it:
- inhibits PCU valve block operation.
During normal operation of the flaps, the SGOI signal will have
no effect on the operation of the flap system 1.
If the SGOI condition is cancelled and the SFCC gets a valid
CSU command, it:
- cancels the PCU valve block inhibition
- cancels the warning signal to the FWC.
If the SFCC detects a SGOI condition in flight, it:
- shows the failure message WRONG INHIBIT SIGN FROM CARGO DOOR
YELLOW SYSTEM in the SFCC 2 class 3 faults flap.
(f) ARINC 429 Outputs (Wraparound)
Each flap channel monitors its ARINC 429 outputs. Wraparound
inputs get the output data. If there is a difference, the related
output stops and the CFDS gets a failure message.
(6) Monitoring of Power Supplies
(a) SFCC DC Supply
Each flap channel monitors its primary 28V DC supply and its
internal secondary power supply. If the primary power supply goes
below 15V DC, or the internal secondary power supply does not
operate:
- the solenoids on the related valve block are de-energized
- the POB locks the related motor
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
NOTE : The failed channel does not arm the WTB in case of
____
interruption of all aircraft DC power. This is to stop the
WTB locking the system at the same time when the DC power
fails.



EFF :
ALL
 27-51-00


R 
AIJ




Page 45
Feb 01/07

(b) WTB DC Supply


Each flap channel monitors the special power supply for its WTB.
If the WTB power input goes below 15V DC:
- the ECAM display unit shows a failure message after flight
- the CFDS gets a failure message.
(c) Synchro Excitation Power
Each flap channel monitors the correct synchro excitation power.
The internal secondary DC power supplies the synchro excitation
power. If the voltages or frequency are not correct:
- the solenoids on the related valve block are de-energized
- the POB locks the related motor
- the channel arms the related WTB
- the other channel receives a WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
If the synchro excitation power goes back to the correct value,
the flaps will operate as normal. If the other channel receives
the WTB-arm signal:
- the WTB lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message.
Reset is only possible on the ground.
(d) LVDT Excitation Power
Each flap channel monitors the correct LVDT excitation power. The
internal secondary DC power supplies the LVDT excitation power.
If the voltages or frequency are outside the specified limits:
- the solenoids on the related valve block are de-energized
- the POB locks the related motor
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the flaps operate at half speed.
If the LVDT excitation power goes back to a value that is in the
specified limits, the flaps will operate as normal.



EFF :
ALL
 27-51-00


R 
AIJ




Page 46
Feb 01/07

D. Failure Table
------------------------------------------------------------------------------MONITORED
ECAM MESSAGE
WARNING
MOTOR
SYSTEM
FAILURE
-----------------------------STATUS
STATUS
E/W CRT
SYS/STATUS CRT
------------------------------------------------------------------------------Asymmetry.
FLT CTL
INOP SYS
CAUTION
The two
Stopped.
Runaway.
FLAPS LOCKED
CAT 3 FLAPS
+
stopped
Can not be
Overspeed.
WING TIP BRK ON
MAX SPEED..
Single
set again
Uncommanded
(a)MAX SPEED..
CAT 2 ONLY
chime
in flight
movement.
(b)GPWS FLAP MODE LDG DIST=x
....OFF
INCREASED FUEL
Mechanical
(c)GPWS LDG FLAPS CONSUMP
failure
3...ON
------------------------------------------------------------------------------Flap
FLT CTL
INOP SYS
CAUTION
The two
Stopped.
disconnect
FLAPS LOCKED
CAT 3 FLAPS
+
stopped
Can not be
ALIGNMENT FAULT
MAX SPEED..
Single
set again
(a)MAX SPEED..
LDG DIST=x
chime
in flight
(b)GPWS FLAP MODE CAT 2 ONLY
....OFF
(c)GPWS LDG FLAPS
3.....ON
------------------------------------------------------------------------------System
FLT CTL
INOP SYS
CAUTION
The two
Stopped.
jam.
FLAPS FAULT
CAT 3 FLAPS
+
stopped
Will be
MAX SPEED...
(a)MAX SPEED. Single
set again
The two Flap FLAPS LEVER.
...
chime
if failure
Channels
...RECYCLE
LDG DIST=x
disappears
failed
(b)GPWS FLAP MODE
CAT 2 ONLY
or
....OFF
INCREASED FUEL
opposite
(c)GPWS LDG FLAPS CONSUMP
CSU
3.....ON
command
CSU failure
(valid outof-detent
for more than
10 seconds)
------------------------------------------------------------------------------Flaps not
CONFIG
WARNING
in Take Off
FLAPS NOT IN
+
config.
T.O. CONFIG
CRC
-------------------------------------------------------------------------------



EFF :
ALL
 27-51-00



AIJ




Page 47
Feb 01/07

------------------------------------------------------------------------------MONITORED
ECAM MESSAGE
WARNING
MOTOR
SYSTEM
FAILURE
-----------------------------STATUS
STATUS
E/W CRT
SYS/STATUS CRT
------------------------------------------------------------------------------Flap Channel FLT CTL
FLAPS SLOW
Stopped
1/2
failure
FLAPS SYS 1(2)
speed
CSU failure
FAULT
(incorrect
pattern)
PPU Synchro.
LVDT.
Valve Block
Solenoid.
Low hydraulic
pressure.
Operation
Mode Coding.
SFCC DC
supply.
Synchro
excitation
supply.
------------------------------------------------------------------------------Hydraulic
FLAPS SLOW
Stopped
1/2
Motor Lock
speed
------------------------------------------------------------------------------WTB supply.
FLT CTL
WTB solenoid FLAP TIP BRK FAULT
------------------------------------------------------------------------------Flap
FLT CTL
attachment
FLAPS ATCH SENSOR
sensor
------------------------------------------------------------------------------ARINC 429
Input/Output.
Installation
Coding
------------------------------------------------------------------------------If the flap position is:
(a) Less than 3.
(b) 3 or FULL.



EFF :
ALL
 27-51-00



AIJ




Page 48
Feb 01/07

E. Computer Behavior upon Power Rise and Cutoff


(1) Transparency
The computer behavior is not altered if its power supply disappears
for a period of less than or equal to 25 ms.
F. Automatic Integrity Test (AIT) Initialization and Cockpit Repercussions
(1) Conditions of AIT initialization
(a) How long the computer must be de-energized:
- more than or equal to 50 ms
(b) A/C configuration:
- on the ground with the slats and flaps stopped
- CFDS label 227 set to NULL
- new date from CFDS compared to last date AIT satisfactorily
done
or
- on the ground with the slats and flaps stopped
- no date information from CFDS
- CFDS label 227 possibly not received = AIT done
NOTE : For the AIT to function, A/C on the ground is specified as
____
follows:
the CFDS label 227 is transmitting code NULL and the A/C
on the Ground (AOG) discrete (through a relay controlled
by the LGCIU) is showing ON GROUND. If CFDS data is not
available, only the AOG discrete is used.
NOTE : The AIT is run automatically once a day. If the SFCC is
____
de-powered (through CBs or after engines stopped) the same
day, the AIT will not run. But if the last AIT has failed
or date information is not available from the CFDIU
(channel not serviceable and failure shown on ECAM
display), the test will run again 60 s after SFCC power-up
(or if power interrupt is more than 50 ms).
(2) Progress of AIT
(a) Duration: approximately 2 s
(b) Cockpit repercussions directly linked to AIT accomplishment
(other repercussions may occur depending on the A/C
configuration, but these can be ignored):
NONE



EFF :
ALL
 27-51-00


R 
AIJ




Page 49
Feb 01/07

(c) The AIT checks the following areas of hardware:


- Processors
- EPROM code stores
- Areas of RAM
- Output consolidation logic
- Power supply
- Input circuitry
- Cross computer WTB ARM signals
(3) Results of AIT (cockpit repercussions, if any, in case of test passed
or test failed)
(a) Test passed
- ECAM warning
* none
(b) Test failed
- ECAM warning (if hydraulic circuit is pressurized or in flight
phase 1 or 10)
* FLT CTL FLAP SYS 1(2) FAULT or FLT CTL SLAT SYS 1(2) FAULT
- ECAM warning (if hydraulic circuit is de-pressurized and not in
flight phase 1 or 10)
* none
8. ______________
Parameter List
A. Description of the Parameter List
The parameter list is put in sequence to refer to the connected ARINC 429
data buses.
The connected systems (e.g. FAC, ECU, EEC, etc.) and the ATA chapter
numbers that agree with it are shown in the header on the left side of
each page of the given lists.
The columns are described as follows:
--------------------------------------------------------------------Column
| Description
-------------------|------------------------------------------------1st
|
EQ.SYS.LAB.SDI = Parameter number
SYS.LAB.SDI
|
| System number: Refer to the system which
| sends out the parameter that agrees with it:
| 1 for system one
| 2 for system two
| 3 for system three
| Label of the parameter, octal value
| refer to ARINC 429.



EFF :
ALL
 27-51-00


R 
AIJ




Page 50
Feb 01/07

--------------------------------------------------------------------Column
| Description
-------------------|------------------------------------------------| SDI gives the Source/Destination Identifier
| which is used by the system for the
| parameter that agrees it:
| 00 means SDI 00 (0)
| 01 means SDI 01 (1)
| 10 means SDI 10 (2)
| 11 means SDI 11 (3)
------------------|------------------------------------------------2nd
| PARAMETER
PARAMETER
| Parameter name
------------------|------------------------------------------------3rd
| RANGE
RANGE
|
| Three different types of ranges are shown in
| this column:
| The first one, shown by a W (WORDRANGE),
| is related to the ARINC 429 data bus. This
| shows the maximum value of the parameter that
| can be transmitted on the bus. It must agree
| with the number of data bits (see column DATA
| BITS) and the resolution (R) of the
| parameter (see column ACCURACY).
| The second one, with no specified indentification
| shows the servicable range of the parameter.
| The third one is related to the ARINC 429
| Discrete Data Words.
| There are two types:
| bit status 0 or bit status 1.
| They show correct condition of the
| data word bit position that agree with it.
-------------------|------------------------------------------------4th
| ACCURACY
ACCURACY
| Two different types of values are shown
| in this column:
| The first one, shown by an R
| (RESOLUTION), is related to the ARINC
| 429 data bus. It also shows the
| resolution of the data word. The second
| one, with no specific indication, shows
| the total accuracy of the parameter.
-------------------|------------------------------------------------5th
| SIGN BIT
SIGN BIT
|
| This column shows if a sign bit is



EFF :
ALL
 27-51-00


R 
AIJ




Page 51
Feb 01/07

--------------------------------------------------------------------Column
| Description
-------------------|------------------------------------------------| available and in which bit position
| of the data word it is located.
-------------------|------------------------------------------------6th
| DATA BITS
DATA BITS
|
| Gives the number of data bits but does
| not include the sign bit. The letter A and a
| number means the discrete bit position
| in the ARINC 429 data word.
| For BCD coded data words the number of
| important data digits is shown,
| indicated by (1).
-------------------|----------------------------------------------7th
| UPD/sec
UPD/sec
|
| This column shows how many times the source
| system will transmit the parameter.
-------------------|----------------------------------------------8th
| CODE
CODE
|
| BNR = binary data word
| BCD = binary coded decimal data word
| ISO = data word coded in ISO 5 Code
| DIS = discrete data word
| HEX = hexadecimal coded
| OCT = octal coded
| HYB = mixed code;
|
e.g. : bit 11 to 16 DIS
|
bit 17 to 28 BNR
-------------------|---------------------------------------------9th
| ALPHA CODING
ALPHA CODING
|
| This column shows the mnemonic for the
| parameter (if available). When this code is
| entered through the MCDU, the current
| parameter value is shown on the
| display. The value from both systems
| (if available) is shown.
-------------------|----------------------------------------------10th
| This column shows the source origin, its
SOURCE
| bus number, ATA Ref., and its label.
EQUPT
|
BUS NR
|
ATA. REF
|



EFF :
ALL
 27-51-00


R 
AIJ




Page 52
Feb 01/07

--------------------------------------------------------------------Column
| Description
-------------------|------------------------------------------------CONV
|
------------------------------------------------------------------B. SFCC Parameter List: 1B
------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------| 1 .045.01 |SLAT/FLAP |
|
|
| 14 | 20 |DIS |
|
|
| 2 .045.10 |COMPONENT |
|
|
|
|
|
|
|
|
|
|STATUS
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT DATA |bit status 1|
|
| #11|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT WTB |bit status 1|
|
| #12|
|
|
|
|
|
|SOLENOID |
|
|
|
|
|
|
|
|
|
|FAILED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SPARE
|
|
|
| #13|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT HALF |bit status 1|
|
| #14|
|
|
|
|
|
|SPEED DE- |
|
|
|
|
|
|
|
|
|
|TECTED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|ADIRU DATA|bit status 1|
|
| #15|
|
|
|
|
|
|MISSED BY |
|
|
|
|
|
|
|
|
|
|SLAT
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|LH FLAP
|bit status 1|
|
| #16|
|
|
|
|
|
|SENSOR
|
|
|
|
|
|
|
|
|
|
|FAIL
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT X|bit status 1|
|
| #17|
|
|
|
|
|
|COMPUTER |
|
|
|
|
|
|
|
|
|
|LINK
|
|
|
|
|
|
|
|
|
|
|MISSED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|



EFF :
ALL
 27-51-00


R 
AIJ




Page 53
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|
|SLAT WTB |bit status 1|
|
| #18|
|
|
|
|
|
|POWER LOSS|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|RH FLAP
|bit status 1|
|
| #19|
|
|
|
|
|
|ATTM
|
|
|
|
|
|
|
|
|
|
|SENSOR
|
|
|
|
|
|
|
|
|
|
|FAIL
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #20|
|
|
|
|
|
|DATA
|
|
|
|
|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #21|
|
|
|
|
|
|WTB
|
|
|
|
|
|
|
|
|
|
|SOLENOID |
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #22|
|
|
|
|
|
|ATTM
|
|
|
|
|
|
|
|
|
|
|SENSOR
|
|
|
|
|
|
|
|
|
|
|FAILED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #23|
|
|
|
|
|
|HALF
|
|
|
|
|
|
|
|
|
|
|SPEED
|
|
|
|
|
|
|
|
|
|
|DETECTED |
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|ADIRU
|bit status 1|
|
| #24|
|
|
|
|
|
|DATA
|
|
|
|
|
|
|
|
|
|
|MISSED
|
|
|
|
|
|
|
|
|
|
|BY FLAP
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|LGCIU DATA|bit status 1|
|
| #25|
|
|
|
|
|
|MISSED
|
|
|
|
|
|
|
|
|
|
|BY FLAP
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP X|bit status 1|
|
| #26|
|
|
|
|
|
|COMPUTER |
|
|
|
|
|
|
|
|
|
|LINK
|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00


R 
AIJ




Page 54
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|
|MISSED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP WTB |bit status 1|
|
| #27|
|
|
|
|
|
|POWER LOSS|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP AUTO |bit status 1|
|
| #28|
|
|
|
|
|
|COMMAND
|
|
|
|
|
|
|
|
|
|
|FAILED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP AUTO |bit status 1|
|
| #29|
|
|
|
|
|
|COMMAND
|
|
|
|
|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SSM
|
|
|
| #30|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|
|
|
|
| #31|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|PARITY
|
|
|
| #32|
|
|
|
|
|______________|__________|____________|____|____|____|____|____|_____|_______|



EFF :
ALL
 27-51-00


R 
AIJ




Page 55
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------| 1 .046.01 |SLAT AND |
|
|
| 19 | 20 |DIS |
|
|
| 2 .046.10 |FLAP
|
|
|
|
|
|
|
|
|
|
|SYSTEM
|
|
|
|
|
|
|
|
|
|
|STATUS
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT FAULT|bit status 1|
|
| #11|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP FAULT|bit status 1|
|
| #12|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #13|
|
|
|
|
|
|SYSTEM
|
|
|
|
|
|
|
|
|
|
|JAM
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #14|
|
|
|
|
|
|SYSTEM
|
|
|
|
|
|
|
|
|
|
|JAM
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT WTB |bit status 1|
|
| #15|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP WTB |bit status 1|
|
| #16|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT/FLAP |bit status 1|
|
| #17|
|
|
|
|
|
|LEVER SEL.|
|
|
|
|
|
|
|
|
|
|0
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT/FLAP |bit status 1|
|
| #18|
|
|
|
|
|
|LEVER SEL.|
|
|
|
|
|
|
|
|
|
|1
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT/FLAP |bit status 1|
|
| #19|
|
|
|
|
|
|LEVER SEL.|
|
|
|
|
|
|
|
|
|
|2
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT/FLAP |bit status 1|
|
| #20|
|
|
|
|
|
|LEVER SEL.|
|
|
|
|
|
|
|
|
|
|3
|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00



AIJ




Page 56
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT/FLAP |bit status 1|
|
| #21|
|
|
|
|
|
|LEVER SEL.|
|
|
|
|
|
|
|
|
|
|FULL
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #22|
|
|
|
|
|
|RELIEF
|
|
|
|
|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #23|
|
|
|
|
|
|ATTACHMENT|
|
|
|
|
|
|
|
|
|
|FAILURE
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT ALPHA|bit status 1|
|
| #24|
|
|
|
|
|
|LOCK
|
|
|
|
|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT BAULK|bit status 1|
|
| #25|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #26|
|
|
|
|
|
|AUTO
|
|
|
|
|
|
|
|
|
|
|COMMAND
|
|
|
|
|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|CSU OUT
|bit status 1|
|
| #27|
|
|
|
|
|
|OF DETENT,|
|
|
|
|
|
|
|
|
|
|AFTER
|
|
|
|
|
|
|
|
|
|
|10 SEC
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #28|
|
|
|
|
|
|DATA
|
|
|
|
|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #29|
|
|
|
|
|
|DATA
|
|
|
|
|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|



EFF :
ALL
 27-51-00



AIJ




Page 57
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|
|SSM
|
|
|
| #30|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|
|
|
|
| #31|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|PARITY
|
|
|
| #32|
|
|
|
|
|______________|__________|____________|____|____|____|____|____|_____|_______|



EFF :
ALL
 27-51-00



AIJ




Page 58
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------| 1 .047.01 |SLAT/FLAP |
|
|
| 19 | 20 |DIS |
|
|
| 2 .047.10 |ACTUAL
|
|
|
|
|
|
|
|
|
|
|POSITION |
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT DATA |bit status 1|
|
| #11|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #12|
|
|
|
|
|
|RETRACTED |
|
|
|
|
|
|
|
|
|
|0 DEG
|
|
|
|
|
|
|
|
|
|
|-5.0 - 6.2|
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT >= 17|bit status 1|
|
| #13|
|
|
|
|
|
|DEG 210.4-|
|
|
|
|
|
|
|
|
|
|337.0 DEG |
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT >= 26|bit status 1|
|
| #14|
|
|
|
|
|
|DEG 321.8-|
|
|
|
|
|
|
|
|
|
|337.0 DEG |
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #15|
|
|
|
|
|
|EXTENDED |
|
|
|
|
|
|
|
|
|
|27 DEG
|
|
|
|
|
|
|
|
|
|
|327.4-337.|
|
|
|
|
|
|
|
|
|
|0 DEG FPPU|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT WTB |bit status 1|
|
| #16|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #17|
|
|
|
|
|
|FAULT
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #18|
|
|
|
|
|
|DATA
|
|
|
|
|
|
|
|
|
|
|VALID
|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00



AIJ




Page 59
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #19|
|
|
|
|
|
|RETRACTED |
|
|
|
|
|
|
|
|
|
|0 DEG
|
|
|
|
|
|
|
|
|
|
|-5.0 - 2.5|
|
|
|
|
|
|
|
|
|
|DEG FPPU |
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP >= 14|bit status 1|
|
| #20|
|
|
|
|
|
|DEG 140.7-|
|
|
|
|
|
|
|
|
|
|254.0 DEG |
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP >=19 |bit status 1|
|
| #21|
|
|
|
|
|
|DEG 163.7-|
|
|
|
|
|
|
|
|
|
|254.0 DEG |
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP >=39 |bit status 1|
|
| #22|
|
|
|
|
|
|DEG 247.8-|
|
|
|
|
|
|
|
|
|
|254.0 DEG |
|
|
|
|
|
|
|
|
|
|FPPU
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #23|
|
|
|
|
|
|EXTENDED |
|
|
|
|
|
|
|
|
|
|40 DEG
|
|
|
|
|
|
|
|
|
|
|250.0-254.|
|
|
|
|
|
|
|
|
|
|0 DEG FPPU|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #24|
|
|
|
|
|
|WTB
|
|
|
|
|
|
|
|
|
|
|ENGAGED
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #25|
|
|
|
|
|
|FAULT
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SPOILER
|bit status 1|
|
| #26|
|
|
|
|
|
|LIFT
|
|
|
|
|
|
|
|
|
|
|DEMAND
|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00



AIJ




Page 60
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SPOILER
|bit status 1|
|
| #27|
|
|
|
|
|
|LIMIT
|
|
|
|
|
|
|
|
|
|
|DEMAND
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SLAT
|bit status 1|
|
| #28|
|
|
|
|
|
|SYSTEM
|
|
|
|
|
|
|
|
|
|
|JAM
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FLAP
|bit status 1|
|
| #29|
|
|
|
|
|
|SYSTEM
|
|
|
|
|
|
|
|
|
|
|JAM
|
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|SSM
|
|
|
| #30|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|
|
|
|
| #31|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|PARITY
|
|
|
| #32|
|
|
|
|
|______________|__________|____________|____|____|____|____|____|_____|_______|



EFF :
ALL
 27-51-00



AIJ




Page 61
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------| 1 .127.01 |SLAT
|
|
|
| 18 | 5 |HYB |
|
|
| 2 .127.10 |ACTUAL
|
|
|
|
|
|
|
|
|
|
|POSITION |
|
|
|
|
|
|
|
|
|-----------------------------------------------------------------------------|
|FPPU
|W +/-180 Deg|
| 29 | 12 |
|BNR |SLAT |
|
|
|ANGLE *1 |R 0.44 Deg |
|
|
|
|
|
|
|
|
|
|------------|
|
|
|
|
|
|
|
|
|
|0 to 27 Deg |
|
|
|
|
|
|
|
|
|
|+/- 0.12 Deg|
|
|
|
|
|
|
|
|-------------------------------------------|----|----|----|----|-----|-------|
|
|LEV|FPPU |
|SLAT |
|
|
|
|
|
|
|
|
|POS|ANGLE |
|ANGLE|
|
|
|
|
|
|
|
|
|
|(DEG) |
|(DEG)|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 0 | 0.0 |bit
|
0 |
|
| #11|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
|
| 66.83|bit
| 5.4 |
|
|
|
|
|
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
|
|167.08|bit
|13.5 |
|
|
|
|
|
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|----- |-----|----|----|----|----|----|-----|-------|
|
| 1 |222.27|bit
| 18 |
|
| #12|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |272.27|bit
| 22 |
|
| #13|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 |272.27|bit
| 22 |
|
| #14|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|FUL|334.16|bit
| 27 |
|
| #15|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|CSU|334.16|bit
| 27 |
|
| #16|
|DIS |
|
|
|
|VA-|
|stat 1|
|
|
|
|
|
|
|
|
|
|LID|
|
|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00



AIJ




Page 62
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|--------------|----------|------|-----|----|----|----|----|----|-----|-------|
|
|SLAT
|bit
|
|
|
| #17|
|DIS |
|
|
|
|CLASS 2
|stat 1|
|
|
|
|
|
|
|
|
|
|FAULTS
|
|
|
|
|
|
|
|
|
|
|
|PRESENT
|
|
|
|
|
|
|
|
|
|
|______________|__________|______|_____|____|____|____|____|____|_____|_______|



EFF :
ALL
 27-51-00



AIJ




Page 63
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------| 1 .137.01 |FLAP
|
|
|
| 18 | 5 |HYB |
|
|
| 2 .137.10 |ACTUAL
|
|
|
|
|
|
|
|
|
|
|POSITION |
|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|FPPU
|W +/-180 Deg|
| 29 | 12 |
|BNR |FLAP |
|
|
|ANGLE *1 |R 0.044 Deg |
|
|
|
|
|
|
|
|
|
|------------|
|
|
|
|
|
|
|
|
|
|0 to 40 Deg |
|
|
|
|
|
|
|
|
|
|+/- 0.12 Deg|
|
|
|
|
|
|
|
|--------------|----------|------------|----|----|----|----|----|-----|-------|
|
|LEV|FPPU |
|FLAP |
|
|
|
|
|
|
|
|
|POS|ANGLE |
|ANGLE|
|
|
|
|
|
|
|
|
|
|(DEG) |
|(DEG)|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 0 | 0.0 |bit
|
0 |
|
| #11|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 1 | 0.0 |bit
|
0 |
|
| #12|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 1 |120.22|bit
| 10 |
|
| #12|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 2 |145.51|bit
| 15 |
|
| #13|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
| 3 |168.35|bit
| 20 |
|
| #14|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
|FUL|251.97|bit
| 40 |
|
| #15|
|DIS |
|
|
|
|
|
|stat 1|
|
|
|
|
|
|
|
|
|--------------|---|------|------|-----|----|----|----|----|----|-----|-------|
|
|CSU|
|bit
|
|
|
| #16|
|DIS |
|
|
|
|VA-|
|stat 1|
|
|
|
|
|
|
|
|
|
|LID|
|
|
|
|
|
|
|
|
|
|
|--------------|----------|------|-----|----|----|----|----|----|-----|-------|
|
|FLAP
|bit
|
|
|
| #17|
|DIS |
|
|
|
|CLASS 2
|stat 1|
|
|
|
|
|
|
|
|



EFF :
ALL
 27-51-00



AIJ




Page 64
Feb 01/07

------------------------------------------------------------------------------|
PARAMETER LIST
PARAMETER CHARACTERISTICS (NUMERIC)
|
------------------------------------------------------------------------------|EQ.SYS.LAB.SDI|PARAMETER | WORD RANGE |UNIT|SIG |BITS|XMSN|CODE|ALPHA|SOURCE |
|
|DEFINITION| OPER RANGE |
|BIT |
|INTV|
|CODE |ORIGIN |
|
|(*=REMARK)| RESOLUTION |
|
|
|
|
|
|BUS No.|
|
|(X=NOTE) | ACCURACY |
|
|
|
|
|
|ATA REF|
|
|
|
|
|
|
|
|
|
|CONV
|
------------------------------------------------------------------------------|
|FAULTS
|
|
|
|
|
|
|
|
|
|
|
|PRESENT
|
|
|
|
|
|
|
|
|
|
|-----------------------------------------------------------------------------|
| 1 .356.01 |MAIN|
|
|
|
|
|
|
|
|
|
| 2 .356.10 |TENANCE
|
|
|
|
|
|
|
|
|
|
|
|MESSAGE
|
|
|
|
|
|
|
|
|
|
|
|WORD
|
|
|
|
|
|
|
|
|
|
|--------------|----------|------|-----|----|----|----|----|----|-----|-------|
| 1 .377.01 |EQUIP|bits: |
|
|
|2(1)| 4 |HEX |
|
|
| 2 .377.10 |MENT
|11-14 |
|
|
|
|
|
|
|
|
|
|IDENTI|low
|
|
|
|
|
|
|
|
|
|
|FICATION |part |
|
|
|
|
|
|
|
|
|
|
|bits: |
|
|
|
|
|
|
|
|
|
|
|15-18 |
|
|
|
|
|
|
|
|
|
|
|high |
|
|
|
|
|
|
|
|
|
|
|part |
|
|
|
|
|
|
|
|
|
|
|bits: |
|
|
|
|
|
|
|
|
|
|
|19-29 |
|
|
|
|
|
|
|
|
|
|
|logic |
|
|
|
|
|
|
|
|
|
|
|0
|
|
|
|
|
|
|
|
|
------------------------------------------------------------------------------Remarks : R
= RESOLUTION
W
= WORD RANGE
(1) = SIGNIFICANT
DATA DIGITS

*1 BIT 28 to 18 contain the


Position Data (FPPU ANGLE)



EFF :
ALL
 27-51-00



AIJ




Page 65
Feb 01/07

FLAPS ELECTRICAL CONTROL AND MONITORING - DEACTIVATION/REACTIVATION


___________________________________________________________________
TASK 27-51-00-040-001
Deactivation of the Slat and Flap Control Computer (SFCC) No. 2 Flap Channel
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-01-A)
SFCC Flap Channel
(Old MMEL ref: 27-51-01-A))

NOTE : For the deactivation of the No. 2 slat channel of the SFCC, refer to
____
TASK 27-51-00-040-005.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice



EFF :
ALL
 27-51-00



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

20-16-00-912-001
24-41-00-861-002
24-41-00-862-002
27-50-00-869-006
27-51-00-710-003
27-51-00-710-004
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
31-32-00-860-001

Circuit Breakers Safety Practices


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Ground Power Cart
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Engine Driven Pumps
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
Menu Page

3. __________
Job Set-up
Subtask 27-51-00-941-070
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slats and flaps.
Subtask 27-51-00-861-056
B. Energize the Aircraft Electrical Circuits
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).



EFF :
ALL
 27-51-00



AIJ




Page 402
May 01/07

Subtask 27-51-00-865-093
C. Table of the circuit breakers used in this procedure:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
4. Procedure
_________
Subtask 27-51-00-040-051
A. Deactivation of the Slat and Flap Control Computer (SFCC) No 2 Flap
Channel
(1) When you do this procedure, it can be necessary to open circuit
breaker 12CV (Ref. TASK 20-16-00-912-001).
(2) Do this procedure:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:

On the MCDU:

- get access to the Flight


Controls (F/CTL) SYSTEM
REPORT/TEST page (Ref. TASK 3132-00-860-001).

- the F/CTL SYSTEM REPORT TEST PAGE is


shown.

- push in the key adjacent to <


SFCC 1.

- the SFCC 1 menu is shown.

- push in the key adjacent to


SYSTEM STATUS FLP >.

- < NO FAULTS > is shown except FLP 1


NO SFCC 2 DATA and/or FLP 1 NO SFCC 2
DATA CHECK WIRING AND SFCC 2.

- push the key adjacent to <


- the SFCC 2 menu is shown.
RETURN until the SYSTEM
REPORT/TEST F/CTL page is shown.
- push in the key adjacent to <
SFCC 2.
- push in the key adjacent to
SYSTEM STATUS FLP >.

- the SYSTEM STATUS FLP page is shown.



EFF :
ALL
 27-51-00



AIJ




Page 403
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- if FLP SYS LOCKED is shown,
reset the wing tip brakes of the
flap system with the SFCC 2
(Ref. TASK 27-50-00-869-006).
- if the to reset the wing tip
- the 28V power supply from SFCC 2 to
brakes (of the flap system) with
the wing tip brakes is disconnected.
the SFCC 2 cannot be completed
satisfactorily, open the circuit
breaker 12CV (Ref. TASK 20-1600-912-001).
- push in the key adjacent to <
RETURN until the F/CTL SYSTEM
REPORT TEST page is shown.
Subtask 27-51-00-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-00-863-054
C. Aircraft Maintenance Configuration.
(1) Make sure that the Green, Yellow and Blue hydraulic systems are
pressurized (Ref. TASK 29-10-00-863-001) (Ref. TASK 29-10-00-863-002)
(Ref. TASK 29-10-00-863-003).



EFF :
ALL
 27-51-00


R 
AIJ




Page 404
May 01/11

Subtask 27-51-00-040-055
D. Deactivation of the SFCC No. 2 Flap Channel (Continued)
(1) Do a check of the SFCC No. 1 flap wing tip brake as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Set the Slat and Flap control
lever to the position 3.

The slats and flaps move to the


position 3.

2. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

3. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

4. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 FLAP


TEST/RESET menu.

5. Push the line key < WTB/POB TEST.

- the MCDU shows the SFCC 1 FLAP


WTB/POB TEST instructions.

6. Push the line key < CONTINUE.

- the MCDU shows the next page of the


SFCC 1 FLAP WTB/POB TEST
instructions.

7. Push the line key < START TEST.

- the MCDU shows that the FLAP WTB/POB


TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
- the MCDU shows in less than 2
minutes:
SFCC 1
PERFORMED
NO FAULTS
RESULT NOT STORED
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY - TEST
INVALID,



EFF :
ALL
 27-51-00



AIJ




Page 405
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------do the steps 1 thru 7 again a maximum
of three times
- if the MCDU continous to show:
PERFORMED UNSUCCESSFULLY - TEST
INVALID,
do the full test procedure with a
Ground Power Cart (Ref. TASK 27-5100-710-003) or the Engine Driven
Pumps (Ref. TASK 27-51-00-710-004).
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY - TEST
FAILURE,
then the aircraft cannot be
dispatched until
the problem is corrected.
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
does not start, this/these
message(s) is (are) shown:
Corrupted RAM - Return On Line,
or Pin Prog Fault.
Then push the < RETURN key
frequently to show the CFDS menu
page. Then do the test again
after the menu mode is shown.
8. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
9. Make sure that the WTBs are not
set.
(2) Put the aircraft back to its initial configuration:
(a) On the MCDU, push the key adjacent to < RETURN until the CFDS
MENU page is shown.
(b) On the MCDU, push the MCDU MENU key and make sure that the MCDU
MAIN MENU is shown.



EFF :
ALL
 27-51-00


R 
AIJ




Page 406
May 01/11

(3) Make an entry in the aircraft technical log that the SFCC No. 2 flap
channel is deactivated.
(4) Attach a warning notice to the circuit breaker 8CV (in the cockpit)
to tell persons that the flap channel for SFCC 2 is deactivated.
R

(5) If circuit
- attach a
cockpit)
the wing

R
R

breaker 12CV was opened in the test procedure:


warning notice to the circuit breaker 12CV (in the
to tell persons that the 28V power supply (from SFCC 2 to
tip brake) is disconnected (Ref. TASK 20-16-00-912-001).

5. Close-up
________
Subtask 27-51-00-864-052
A. Aircraft Maintenance Configuration
(1) Make sure that the Green, Yellow and Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002) (Ref. TASK 29-10-00-864-003).
Subtask 27-51-00-862-057
B. De-energize the Aircraft Electrical Circuits
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-51-00-865-104
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14CC1, 14CC2
Subtask 27-51-00-942-069
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00



AIJ




Page 407
May 01/07

TASK 27-51-00-440-001
Reactivation of the Slat and Flap Control Computer (SFCC) No. 2 Flap Channel
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-01-A)
SFCC Flap Channel
(Old MMEL ref: 27-51-01-A))

NOTE : For the reactivation of the No. 2 slat channel of the SFCC, refer to
____
TASK 27-51-00-440-005.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-16-00-912-001

Circuit Breakers Safety Practices



EFF :
ALL
 27-51-00



AIJ




Page 408
May 01/11

3. __________
Job Set-up
Subtask 27-51-00-941-074
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slats and flaps.
Subtask 27-51-00-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-00-865-094
C. Table of the circuit breakers used in this procedure:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
4. Procedure
_________
Subtask 27-51-00-865-081
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
8CV.
Subtask 27-51-00-865-095
R
R

B. If necessary, remove the safety clip and tag and close the circuit
breaker 12CV (Ref. TASK 20-16-00-912-001).



EFF :
ALL
 27-51-00



AIJ




Page 409
May 01/07

Subtask 27-51-00-440-051
C. Reactivation of the Slat and Flap Control Computer (SFCC) No. 2 Flap
Channel
R
R
R

(1) Do the trouble-shooting of the SFCC and do the applicable


correction(s) (Ref. TSM 27). Use the Fault Symptom(s) as entry into
the Trouble Shooting Manual (TSM).
(2) Make an entry in the aircraft technical log to say that the SFCC No.
2 flap channel has been reactivated.
5. Close-up
________
Subtask 27-51-00-942-071
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



R
EFF :
ALL
 27-51-00



AIJ




Page 410
May 01/09

TASK 27-51-00-040-005
Deactivation of the Slat and Flap Control Computer (SFCC) No. 2 Slat Channel
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-02-A)
SFCC Slat Channel
(Old MMEL ref: 27-51-01-B))

NOTE : For the deactivation of the No. 2 flap channel of the SFCC, refer to
____
TASK 27-51-00-040-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice



EFF :
ALL
 27-51-00



AIJ




Page 411
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-16-00-912-001
24-41-00-861-002
24-41-00-862-002
27-51-00-710-003
27-51-00-710-004
27-80-00-869-004
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
31-32-00-860-001

Circuit Breakers Safety Practices


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Ground Power Cart
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Engine Driven Pumps
Reset of the Wing Tip Brake (WTB) of the Slat System
on the Ground
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
Menu Page

3. __________
Job Set-up
Subtask 27-51-00-941-075
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slats and flaps.
Subtask 27-51-00-861-057
B. Energize the Aircraft Electrical Circuits
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).



R
EFF :
ALL
 27-51-00



AIJ




Page 412
Nov 01/10

Subtask 27-51-00-865-096
C. Table of the circuit breakers used in this procedure:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
4. Procedure
_________
Subtask 27-51-00-040-050
A. Deactivation of the Slat and Flap Control Computer (SFCC) No.2 Slat
Channel
(1) When you do this procedure, it can be necessary to open circuit
breaker 11CV (Ref. TASK 20-16-00-912-001).
(2) Do this procedure:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:

On the MCDU:

- get access to the Flight


Controls (F/CTL) SYSTEM
REPORT/TEST page (Ref. TASK 3132-00-860-001)

- the F/CTL SYSTEM REPORT TEST PAGE is


shown

- push in the key adjacent to <


SFCC1

- the SFCC1 menu is shown

- push in the key adjacent to <


SYSTEM STATUS SLAT

- < NO FAULTS > is shown except SLT 1


NO SFCC 2 DATA and/or SLT 1 NO SFCC 2
DATA CHECK WIRING AND SFCC 2

- push the key adjacent to <


RETURN until the SYSTEM
REPORT/TEST F/CTL page is shown
- push in the key adjacent to
<SFCC2

- the SFCC2 menu is shown



EFF :
ALL
 27-51-00



AIJ




Page 413
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- push in the key adjacent to <
- the SYSTEM STATUS SLAT page is shown
SYSTEM STATUS SLAT
- if SLT SYS LOCKED is shown,
reset the wing tip brakes of the
slat system with the SFCC 2
(Ref. TASK 27-80-00-869-004)
- if the reset of the reset the
wing tip brakes (of the slat
system) with the SFCC 2 cannot
be completed satisfactorily,
open the circuit breaker 11CV
(Ref. TASK 20-16-00-912-001).

- the 28V power supply from SFCC 2 to


the wing tip brakes, is disconnected.

- push in the key adjacent to <


RETURN until the F/CTL SYSTEM
REPORT/TEST page is shown.
Subtask 27-51-00-865-078
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-51-00-863-055
C. Aircraft Maintenance Configuration
(1) Pressurize the Green, Yellow and Blue hydraulic systems. (Ref. TASK
29-10-00-863-001) (Ref. TASK 29-10-00-863-002) (Ref. TASK 29-10-00863-003).



R
EFF :
ALL
 27-51-00



AIJ




Page 414
May 01/11

Subtask 27-51-00-040-053
D. Deactivation of the SFCC No. 2 Slat Channel (Continued)
(1) Do a check of the SFCC No. 1 SLAT wing tip brake as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Set the Slat and Flap control
lever to the position 3.

The slats and flaps move to the


position 3.

2. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

3. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

4. Push the line key TEST/RESET SLT


>.

- the MCDU shows the SFCC 1 SLAT


TEST/RESET menu.

5. Push the line key < WTB/POB TEST.

- the MCDU shows the SFCC 1 SLAT


WTB/POB TEST instructions.

6. Push the line key < CONTINUE.

- the MCDU shows the next page of the


SFCC 1 SLAT WTB/POB TEST
instructions.

7. Push the line key < START TEST.

- the MCDU shows that the SLAT WTB/POB


TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
- the MCDU shows in less than 2
minutes:
SFCC 1
PERFORMED
NO FAULTS
RESULT NOT STORED
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY - TEST
INVALID,



EFF :
ALL
 27-51-00



AIJ




Page 415
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------do the steps 1 thru 7 again a maximum
of three times
- if the MCDU still shows:
PERFORMED UNSUCCESSFULLY - TEST
INVALID,
do the full test procedure with a
Ground Power Cart (Ref. TASK 27-5100-710-003) or the Engine Driven
Pumps (Ref. TASK 27-51-00-710-004).
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY - TEST
FAILURE,
then the aircraft cannot be
despatched until the problem has been
corrected.
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
does not start, this(these)
message(s) is (are) shown:
Corrupted RAM - Return On Line,
or Pin Prog Fault.
Then push the < RETURN key
frequently to show the CFDS menu
page. Then do the test again
after the menu mode is shown.
8. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
9. Make sure that the WTBs are not
set.
(2) Put the aircraft back to its initial configuration:
(a) On the MCDU, push the key adjacent to < RETURN until the CFDS
MENU page is shown.
(b) On the MCDU, push the MCDU MENU key and make sure that the MCDU
MAIN MENU is shown.



EFF :
ALL
 27-51-00


R 
AIJ




Page 416
May 01/11

(3) Make an entry in the aircraft technical log that the SFCC No. 2 slat
channel is deactivated.
(4) Attach a warning notice to the circuit breaker 7CV (in the cockpit)
to tell persons that the slat channel for SFCC 2 is deactivated.
(5) If the circuit breaker 11CV, was opened in the test procedure:
- attach a warning notice to the circuit breaker 11CV (in the
cockpit) to tell persons that the 28V power supply (from SFCC 2 to
the wing tip brake) is disconnected (Ref. TASK 20-16-00-912-001).
5. Close-up
________
Subtask 27-51-00-864-054
A. Aircraft Maintenance Configuration
(1) Release the pressure from the Green, Yellow and Blue hydraulic
systems. (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002)
(Ref. TASK 29-10-00-864-003).
Subtask 27-51-00-862-058
B. De-energize the Aircraft Electrical Circuits
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-51-00-865-105
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14CC1, 14CC2
Subtask 27-51-00-942-070
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 417
May 01/11

TASK 27-51-00-440-005
Reactivation of the Slat and Flap Control Computer (SFCC) No. 2 Slat Channel
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-02-A)
SFCC Slat Channel
(Old MMEL ref: 27-51-01-B))

NOTE : For the reactivation of the No. 2 flap channel of the SFCC, refer to
____
TASK 25-51-00-440-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-16-00-912-001

Circuit Breakers Safety Practices



EFF :
ALL
 27-51-00



AIJ




Page 418
May 01/11

3. __________
Job Set-up
Subtask 27-51-00-941-076
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slats or flaps.
Subtask 27-51-00-865-079
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-51-00-865-097
C. Table of the circuit breakers used in this procedure:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
4. Procedure
_________
Subtask 27-51-00-865-080
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
7CV.
Subtask 27-51-00-865-098
B. If necessary, remove the safety clip and tag and close the circuit
breaker 11CV (Ref. TASK 20-16-00-912-001).



EFF :
ALL
 27-51-00


R 
AIJ




Page 419
May 01/11

Subtask 27-51-00-440-053
C. Reactivation of the Slat and Flap Control Computer (SFCC) No. 2 Slat
Channel
(1) Do the trouble-shooting of the SFCC and do the applicable
correction(s) (Ref. TSM 27). Use the Fault Symptom(s) as entry into
the Trouble Shooting Manual (TSM).
(2) Make an entry in the aircraft technical log to say that the SFCC No.
2 slat channel has been reactivated.
5. Close-up
________
Subtask 27-51-00-942-072
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 420
May 01/11

TASK 27-51-00-040-004
Deactivation of the SFCC 2 Flap WTB Solenoids
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-03-A)
Flap Wing Tip Brakes Solenoid
(Old MMEL ref: 27-51-02)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice



EFF :
ALL
 27-51-00



AIJ




Page 421
May 01/11

INTENTIONALLY BLANK



R

 27-51-00



AIJ




Page 422
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
27-51-00-710-003
27-51-00-710-004
29-10-00-863-001
29-23-00-863-001

Energize the Aircraft Electrical Circuits from the


External Power
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Ground Power Cart
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Engine Driven Pumps
Pressurize the Green Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump

3. __________
Job Set-up
Subtask 27-51-00-941-065
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the flap system.
Subtask 27-51-00-860-076
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Blue hydraulic system with the electric pump
(Ref. TASK 29-10-00-863-001).
R
R

(3) Pressurize the Green hydraulic system from the Yellow hydraulic
system through the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-863001).



EFF :
ALL
 27-51-00



AIJ




Page 423
May 01/08

4. Procedure
_________
Subtask 27-51-00-865-090
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-51-00-040-054
B. Deactivation of the SFCC No. 2 Flap WTB Solenoids
(1) Do a check of the SFCC No. 1 Flap WTB as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Set the Slat and Flap control
lever to the position 3.

The slats and flaps move to the


position 3.

2. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

3. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFFC 1 menu.

4. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 FLAP


TEST/RESET menu.

5. Push the line key < WTB/POB TEST.

- the MCDU shows the SFFC 1 FLAP


WTB/POB TEST instructions.

6. Push the line key < CONTINUE.

- the MCDU shows the next page of the


SFCC 1 FLAP WTB/POB TEST
instructions.

7. Push the line key < START TEST.

- the MCDU shows that the FLAP WBT/POB


TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the



R
EFF :
ALL
 27-51-00



AIJ




Page 424
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------instructions the MCDU
shows.
- the MCDU shows in less than 2
minutes:
SFCC 1
PERFORMED
NO FAULTS
RESULT NOT STORED
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY
do the steps 1 thru 7 again a maximum
of three times
- if the MCDU still shows:
PERFORMED UNSUCCESSFULLY
do the full test procedure with a
Ground Power Cart (Ref. TASK 27-5100-710-003) or the Engine Driven
Pumps (Ref. TASK 27-51-00-710-004).
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
will not operate, the subsequent
message(s) is (are) displayed:
Corrupted RAM - Return On Line,
or Pin Prog Fault.
Then push the < RETURN key
frequently to show the CFDS menu
page. Then do the test again
after the menu mode is
displayed.
8. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
9. Make sure that the WTBs are not
set.
(2) Put the aircraft back to its initial configuration:
(a) On the MCDU, push the key adjacent to < RETURN until the CFDS
MENU page is shown.



EFF :
ALL
 27-51-00


R 
AIJ




Page 425
May 01/11

(b) On the MCDU, push the MCDU MENU key and make sure that the MCDU
MAIN MENU is shown.
(3) Put a warning notice in the cockpit to tell the flight crew that one
or two of the SFCC No. 2 flap WTB solenoids are deactivated.
(4) Make an entry in the aircraft technical log that the SFCC No. 2 WTB
solenoids are deactivated.
Subtask 27-51-00-865-102
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
7CV, 8CV, 14CC1, 14CC2
5. Close-up
________
Subtask 27-51-00-942-060
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 426
May 01/11

TASK 27-51-00-440-004
Reactivation of the SFCC 2 Flap WTB Solenoids
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-51-03-A)
Flap Wing Tip Brakes Solenoid
(Old MMEL ref: 27-51-02)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

3. __________
Job Set-up
Subtask 27-51-00-941-064
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the flap system.



EFF :
ALL
 27-51-00



AIJ




Page 427
May 01/11

INTENTIONALLY BLANK



R

 27-51-00



AIJ




Page 428
May 01/11

4. Procedure
_________
Subtask 27-51-00-440-052
A. Reactivation of the SFCC 2 Flap WTB Solenoids
R
R
R

(1) Do the trouble-shooting of the WTB solenoids and do the applicable


corrections (Refer to TSM 27). Use the Fault Symptoms as entry into
the TSM.
(2) Make an entry in the aircraft technical logbook to record the
reactivation of the SFCC 2 WTB solenoids.
5. Close-up
________
Subtask 27-51-00-942-061
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00



AIJ




Page 429
Nov 01/10

FLAPS ELECTRICAL CONTROL AND MONITORING - ADJUSTMENT/TEST


_________________________________________________________
R

TASK 27-51-00-740-001
Read-out of Class 3 Faults in the Flap System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------31-32-00-869-002

Procedure for Class 3 Faults Reading



EFF :
ALL
 27-51-00



AIJ




Page 501
Feb 01/07

3. __________
Job Set-up
Subtask 27-51-00-941-066
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap controls.
4. Procedure
_________
Subtask 27-51-00-869-051
A. Read-out of Class 3 Faults in the Flap System.
(1) Read for Class 3 faults in the flap system (Ref. TASK 31-32-00-869002).
5. Close-up
________
Subtask 27-51-00-942-066
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 502
Feb 01/07

TASK 27-51-00-740-002
Bite Test of the Slat and Flap Control Computers (Flap System)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
NOTE : IGNORE ALL THE ECAM WARNINGS WHEN THE COMPUTER IS IN THE MENU MODE.
____
1. __________________
Reason for the Job
Self Explanatory
NOTE : Refer to SIL 27-116 for SFCC In-Service Standards and SFCC
____
Combinations.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
31-32-00-860-006

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page



EFF :
ALL
 27-51-00



AIJ




Page 503
Feb 01/07

3. __________
Job Set-up
Subtask 27-51-00-941-071
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-51-00-860-057
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST F/CTL page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
Subtask 27-51-00-865-062
C. Make sure that this(these) circuit breaker(s) is(are) closed:

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-51-00



AIJ




Page 504
Feb 01/07

4. Procedure
_________
Subtask 27-51-00-740-050
A. BITE Test of the Slat and Flap Control Computer (Flap System)
NOTE : Use the Multipurpose Control Display Unit (MCDU) 2 on panel 11VU
____
for the test.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the Multipurpose Control
Display unit (MCDU):
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

2. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 menu.

3. On the MCDU:
- push the line key TEST/RESET
FLP>.

On the MCDU:
- the MCDU shows the SFCC 1 FLAP
TEST/RESET menu.

4. On the MCDU:
- push the line key < SFCC TEST.

- the MCDU shows SFCC 1


FLAP SFCC TEST
IN PROGRESS
- for a positive test result the MCDU
shows SFCC 1
FLAP SFCC TEST
NO FAULTS
- for a negative test result, the MCDU
shows SFCC 1
FLAP SFCC TEST
PERFORMED WITH FAULT
<FAULT DATA
(push the line key <FAULT DATA to
show the the failure data)
- if the test finds a peripheral fault,
the MCDU shows SFCC 1
FLAP SFCC TEST
NO FAULTS BUT
(for a peripheral fault see the
display below).

5. On the MCDU:



EFF :
ALL
 27-51-00



AIJ




Page 505
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- push the line key < RETURN
frequently until the MCDU shows
the SYSTEM REPORT/TEST
F/CTL menu.
6. On the MCDU:
- push the line key < SFCC 2.

On the MCDU:
- the MCDU shows the SFCC 2 menu.

7. Do the SFCC test as described


above with the SFCC 2 menu.
8. On the MCDU:
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
------------------------------------------------------------------------------|
If there is a peripheral fault, the SFCC TEST RESULT
|
| page will be shown on the CFDS.
|
|-----------------------------------------------------------------------------|
|
SFCC 1
|
|
FLAP SFCC TEST
|
|
DATE:XXX XX UTC:XXXX
|
|
1L -|NO FAULTS BUT
|- 1R
|
|
|
|
|
|
2L -|*
|- 2R
|
|
|
|
|
|
3L -|**
|- 3R
|
|
|
|
|
|
4L -|
|- 4R
|
|
|
|
|
|
5L -|
|- 5R
|
|
|
|
|
|
6L -|<RETURN
PRINT>|- 6R
|
|
|
------------------------------------------------------------------------------NOTE : * If the X-computer arm test is not done during the TEST these
____
words will be shown:



EFF :
ALL
 27-51-00


R 
AIJ




Page 506
Feb 01/11

R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
2L -|OTHER SFCC ARM SIGNAL|- 2R
|
|
|NOT TESTED
|
|
|
|
------------------------------------------------------------------------------NOTE : ** Shows one or more of the peripheral faults or a system is not
____
complete as follows:

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
either
|WTB SET
|
|
|
|
|
|
|
and/or
|NO WTB POWER
|
|
|
|
|
|
|
and/or
|LH WTB SOLENOID X/X |
|
|
|
|
|
|
and/or
|RH WTB SOLENOID X/X |
|
|
|
|
|
|
and/or
|FPPU FAULT
|
|
|
|
|
|
|
and/or
|LH APPU FAULT
|
|
|
|
|
|
|
and/or
|RH APPU FAULT
|
|
|
|
------------------------------------------------------------------------------NOTE : X/X shows S/C short circuit or O/C open circuit.
____
5. Close-up
________
Subtask 27-51-00-862-051
A. Aircraft Configuration
(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-51-00-942-075
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00



AIJ




Page 507
May 01/10

TASK 27-51-00-710-001
Operational Test of the Wing Tip Brake and the Pressure Off Brake
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275100-01
R
R

NOTE : If you do this task together with MPD-TASK 275100-03, do MPD-TASK


____
275100-03 after this operational test.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-50-00-869-006

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground



EFF :
ALL
 27-51-00



AIJ




Page 508
Aug 01/08

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-00-750-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
31-32-00-860-006
27-51-00-710-003
27-51-00-710-004

Automatic Integrity Test of the Slat and Flap Control


Computers
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Ground Power Cart (for
corrective action)
Operational Test of the Wing Tip Brake and the
Pressure Off Brake with the Engine Driven Pumps (for
corrective action)

3. __________
Job Set-up
Subtask 27-51-00-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in position to tell persons that the flap and
slat systems are in operation.
Subtask 27-51-00-860-054
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).



EFF :
ALL
 27-51-00


R 
AIJ




Page 509
Aug 01/08

(4) Do the automatic integrity test of the two SFCCs which includes Slat
and Flap BITE tests of the two computers (Ref. TASK 27-51-00-750001).
NOTE : If the test shows that the Wing Tip Brakes (WTBs) are set, do
____
the Reset of the WTBs of the Flap System on the Ground
(Ref. TASK 27-50-00-869-006).
Subtask 27-51-00-865-064
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-865-065
D. Make sure that this(these) circuit breaker(s) is(are) closed:

R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-00-860-052
E. Aircraft Maintenance Configuration
(1) Pressurize the Blue hydraulic system with the electric pump
(Ref. TASK 29-10-00-863-003).
(2) Pressurize the Green hydraulic system from the Yellow hydraulic
system through the Power Transfer Unit (PTU) with the electric pump
(Ref. TASK 29-23-00-863-001).



EFF :
ALL
 27-51-00



AIJ




Page 510
Nov 01/10

4. Procedure
_________
Subtask 27-51-00-710-052
A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
NOTE : When you do this test the flap surfaces will move automatically.
____
(1) Make sure that the CFDS is not in the SFCC menu mode before you start
the test. The test will not operate, if a BITE test was completed
before. Subsequently Pin Prog Fault will be shown.
(2) Test
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
2. Set the slat and flap control
lever to the position 3.

The slats and flaps move to the


position 3.

3. On the MCDU:
- push the line key < SFCC 1 (2).

ON the MCDU:
- the MCDU shows the SFCC 1 (2) menu.

4. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 (2) menu.

5. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 (2) FLAP


TEST/RESET menu.

6. Push the line key < WTB/POB TEST.

- the MCDU shows the SFCC 1 (2) FLAP


WTB/POB TEST instructions.

7. Push the line key < CONTINUE.

- the MCDU shows the next page of the


SFCC 1 (2) FLAP WTB/POB TEST
instructions.

8. Push the line key < START TEST.



EFF :
ALL
 27-51-00



AIJ




Page 511
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------9. If the line key < START TEST is
- the MCDU shows that the FLAP WTB/POB
not shown, do the instructions
TEST is IN PROGRESS
that the MCDU shows.
- the MCDU shows in less than 2 minutes
SFCC 1 (2):
PERFORMED
NO FAULTS
RESULT NOT STORED
- if the MCDU shows:
PERFORMED UNSUCCESSFULLY
do the steps 1 thru 7 again a maximum
of three times
- if the MCDU continues to show
PERFORMED UNSUCCESSFULLY:
do the full test procedure with a
ground power cart (Ref. TASK 27-5100-710-003) or
the engine driven pumps
(Ref. TASK 27-51-00-710-004).
10. If the wing tip brake and the
pressure off brake do not
operate:
- Push the < RETURN key
frequently to show the CFDS
menu page. Do the test again
after the menu mode is shown.
NOTE : When the test of the wing
____
tip brake and the pressure
off brake do not operate,
the subsequent message is
shown:
Pin Prog Fault.
11. Push the line key < RETURN
frequently until the SYSTEM



EFF :
ALL
 27-51-00


R 
AIJ




Page 512
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------12. Open the circuit breakers 5CV
and 6CV (flap and slat system
1).

13. Close the circuit breakers 7CV


and 8CV (flap and slat system
2).

14. Use the SFCC 2 to do this test


again.

15. Push the line key < RETURN


frequently until the CFDS menu
page is shown.

16. Close the circuit breakers 5CV


and 6CV.

17. Set the Slat and Flap control


lever to the position 0.
5. Close-up
________
Subtask 27-51-00-865-056

R
R
R
R
R
R
R

A. Close this(these) circuit breaker(s):


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-860-053
B. Aircraft Configuration
(1) De-pressurize the Green and Yellow hydraulic systems (Ref. TASK 2923-00-864-001).
(2) De-pressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-51-00



AIJ




Page 513
Nov 01/09

(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


Subtask 27-51-00-942-051
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 514
Nov 01/09

TASK 27-51-00-710-003
Operational Test of the Wing Tip Brake and the Pressure Off Brake with the
Ground Power Cart
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explantory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-50-00-869-006
27-51-00-750-001

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground
Automatic Integrity Test of the Slat and Flap Control
Computers



EFF :
ALL
 27-51-00



AIJ




Page 515
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-003
29-10-00-864-001
29-10-00-864-003
29-23-00-863-002
31-32-00-860-006

Pressurize the Blue Hydraulic System with a Ground


Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page

3. __________
Job Set-up
Subtask 27-51-00-941-068
A. Safety Precautions
(1) Put the safety barriers in position.
R
R

(2) Put the warning notices in position to tell persons that the flap and
slat systems are in operation.
Subtask 27-51-00-860-063
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
(4) Do the automatic integrity test of the two SFCCs which includes Slat
and Flap BITE tests of the two computers (Ref. TASK 27-51-00-750001).
(5) Make sure that the Wing Tip Brakes (WTBs) are not set (Ref. TASK 2750-00-869-006).



EFF :
ALL
 27-51-00



AIJ




Page 516
Nov 01/09

Subtask 27-51-00-865-083
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-865-084
D. Make sure that this(these) circuit breaker(s) is(are) closed:

R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-00-860-069
E. Aircraft Maintenance Configuration
(1) Pressurize the Blue hydraulic system with the ground power cart
(Ref. TASK 29-10-00-863-003).
(2) Pressurize the Yellow hydraulic system from the Green hydraulic
system through the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-863002).
4. Procedure
_________

Subtask 27-51-00-710-067-A

A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-51-00



AIJ




Page 517
May 01/10

NOTE : Use the Multipurpose Control Display Unit (MCDU) 3 on panel 1VU
____
for the test. If the MCDU 3 is defective, use the MCDU 2 on panel
11VU.
NOTE : When you do this test the flap surfaces will move automatically.
____
NOTE : Make sure that the CFDS is not in the SFCC menu mode before you
____
start the test. The test will not operate, if a BITE test was
completed before. Subsequently Corrupted RAM - Return On Line - or
Pin Prog Fault will be displayed.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
2. Set the Slat and Flap control
lever to the position 3.

The Slats and Flaps move to the


position 3.

3. On the MCDU:
- push the line key < SFCC 1 (2).

On the MCDU:
- the MCDU shows the SFCC 1 (2) menu.

NOTE : Use the SFCC 2 to do this test again for the WTB 33CV-B and 34CV-B.
____
4. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 (2) menu.

5. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 (2) FLAP


TEST/RESET menu.

6. Push the line key < WTB/POB TEST.

- the MCDU shows the SFCC 1 (2) FLAP


WTB/POB TEST instructions.

7. Push the line key < CONTINUE

- the MCDU shows the next page of the


SFCC 1 (2) FLAP WTB/POB TEST
instructions.

8. Push the line key < START TEST.

- the MCDU shows that the FLAP WTB/POB


TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.



EFF :
ALL
 27-51-00



AIJ




Page 518
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- the MCDU shows in less than 2 minutes
SFCC 1 (2)
PERFORMED
NO FAULTS
RESULT NOT STORED
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
will not operate, the subsequent
message(s) is (are) displayed:
Corrupted RAM - Return On Line ,
or Pin Prog Fault.
Then push the <RETURN key
frequently to show the CFDS menu
page. Then do the test again
after the menu mode is
displayed.
9. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
10. Make sure that the WTBs are not
set.
11. Open the circuit breakers 5CV and
6CV (flap and slat system 1).
12. Close the circuit breakers 7CV
and 8CV (flap and slat system 2).
13. Use the SFCC 2 to do this test
again.
14. Push the line key <RETURN
frequently until the CFDS menu
page is shown.
15. Close the circuit breakers 5CV
and 6CV.
16. Set the Slat and Flap control
lever to the position 0.



EFF :
ALL
 27-51-00


R 
AIJ




Page 519
Feb 01/11

5. Close-up
________
Subtask 27-51-00-865-085
A. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-860-070
B. Aircraft Configuration
(1) De-pressurize the Green and Blue hydraulic systems (Ref. TASK 29-1000-864-001) and (Ref. TASK 29-10-00-864-003).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-51-00-942-073
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 520
Feb 01/11

TASK 27-51-00-710-004
Operational Test of the Wing Tip Brake and the Pressure Off Brake with the
Engine Driven Pumps
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-50-00-869-006
27-51-00-750-001

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground
Automatic Integrity Test of the Slat and Flap Control
Computers



EFF :
ALL
 27-51-00



AIJ




Page 521
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-001
29-10-00-863-002
29-10-00-863-003

71-00-00-710-003
71-00-00-710-004

Pressurize the Green Hydraulic System


Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurize the Yellow Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Engine Automatic Start
Engine Manual Start

71-00-00-710-028

Engine Shutdown

29-10-00-864-001
29-10-00-864-003
29-24-00-864-001
31-32-00-860-006

R
3. __________
Job Set-up
Subtask 27-51-00-941-069
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in position to tell persons that the flap and
slat systems are in operation.
Subtask 27-51-00-860-066
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
(4) Do the automatic integrity test of the two SFCCs which includes Slat
and Flap BITE tests of the two computers (Ref. TASK 27-51-00-750001).



EFF :
ALL
 27-51-00



AIJ




Page 522
May 01/11

(5) Make sure that the Wing Tip Brakes (WTBs) are not set (Ref. TASK 2750-00-869-006).
Subtask 27-51-00-865-086
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-865-087
D. Make sure that this(these) circuit breaker(s) is(are) closed:

R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-00-860-067
E. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Start both engines by the Engine Automatic-Start Procedure (Ref. TASK
71-00-00-710-003) or the Engine Manual-Start Procedure (Ref. TASK 7100-00-710-004).
(2) Pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-863-001), (Ref. TASK 29-10-00-863-002) and (Ref. TASK 29-1000-863-003).



EFF :
ALL
 27-51-00



AIJ




Page 523
May 01/10

4. Procedure
_________
Subtask 27-51-00-710-068-A
A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
NOTE : Use the Multipurpose Control Display Unit (MCDU) 3 on panel 1VU
____
for the test. If the MCDU 3 is defective, use the MCDU 2 on panel
11VU.
NOTE : When you do this test the flap surfaces will move automatically.
____
NOTE : Make sure that the CFDS is not in the SFCC menu mode before you
____
start the test. The test will not operate, if a BITE test was
completed before. Subsequently Corrupted RAM - Return On Line - or
Pin Prog Fault will be displayed.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
2. Set the Slat and Flap control
lever to the position 3.

The Slats and Flaps move to the


position 3.

3. On the MCDU:
- push the line key < SFCC 1 (2).

On the MCDU:
- the MCDU shows the SFCC 1 (2) menu.

NOTE : Use the SFCC 2 to do this test again for the WTB 33CV-B and 34CV-B.
____
4. Push the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 (2) menu.

5. Push the line key TEST/RESET FLP


>.

- the MCDU shows the SFCC 1 (2) FLAP


TEST/RESET menu.

6. Push the line key < WTB/POB TEST.

- the MCDU shows the SFCC 1 (2) FLAP


WTB/POB TEST instructions.



EFF :
ALL
 27-51-00



AIJ




Page 524
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------7. Push the line key < CONTINUE
- the MCDU shows the next page of the
SFCC 1 (2) FLAP WTB/POB TEST
instructions.
8. Push the line key < START TEST.

- the MCDU shows that the FLAP WTB/POB


TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
- the MCDU shows in less than 2 minutes
SFCC 1 (2)
PERFORMED
NO FAULTS
RESULT NOT STORED
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
will not operate,the subsequent
message(s) is (are) displayed:
Corrupted RAM - Return On Line ,
or Pin Prog Fault.
Then push the <RETURN key
frequently to show the CFDS menu
page. Then do the test again
after the menu mode is
displayed.
9. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
10. Make sure that the WTBs are not
set.
11. Open the circuit breakers 5CV and
6CV (flap and slat system 1).
12. Close the circuit breakers 7CV
and 8CV (flap and slat system 2).
13. Use the SFCC 2 to do this test
again.



EFF :
ALL
 27-51-00


R 
AIJ




Page 525
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------14. Push the line key <RETURN
frequently until the CFDS menu
page is shown.
15. Close the circuit breakers 5CV
and 6CV.
16. Set the Slat and Flap control
lever to the position 0.
5. Close-up
________
Subtask 27-51-00-865-089
A. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-51-00-860-068
B. Aircraft Configuration
(1) Stop operation of the engines.
(a) Decrease both engines to MIN IDLE for five minutes.
R

(b) Do the Engine Shutdown Procedure (Ref. TASK 71-00-00-710-028).


(2) De-pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-24-00-864-001) and (Ref. TASK 29-1000-864-003).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(4) Close the circuit breaker 2WW.



EFF :
ALL
 27-51-00



AIJ




Page 526
May 01/11

Subtask 27-51-00-942-074
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 527
Feb 01/07

TASK 27-51-00-820-001
Manual Adjustment of the Position Pick-Off Units
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
To set the mechanical zero position of the Position Pick-off Units.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

safety barriers

R
R
R

No specific
No specific
No specific

warning notice
1 LABEL - ADHESIVE, INOP
1 TIE WRAP



EFF :
ALL
 27-51-00



AIJ




Page 528
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-18-000-001
27-51-18-400-001
R

27-51-19-000-001
27-51-19-400-001
27-55-11-000-001
27-55-11-400-001
27-81-18-000-001
27-81-18-400-001
27-81-19-000-001
27-81-19-400-001
27-85-11-000-001
27-85-11-400-001
27-51-00-991-003

Removal of the Asymmetry-Position Pick-Off Unit 29CV


(30CV)
Installation of the Asymmetry-Position Pick-Off Unit
29CV (30CV)
Removal of the Feed Back Position Pick-Off Unit
Installation of the Feed Back Position Pick-Off Unit
Removal of the Instrumentation Position Pick-Off Unit
Installation of the Instrumentation Position Pick-Off
Unit
Removal of the Asymmetry-Position Pick-Off Unit 31CV
(32CV)
Installation of the Asymmetry-Position Pick-Off Unit
31CV (32CV)
Removal of the Feed Back Position Pick-Off Unit
Installation of the Feed Back Position Pick-Off Unit
Removal of the Instrumentation Position Pick-Off Unit
Installation of the Instrumentation Position Pick-Off
Unit
Fig. 501

3. __________
Job Set-up
Subtask 27-51-00-941-072
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-51-00-010-060
B. Get Access
(1) Remove the applicable Position Pick-off Unit (PPU):
- for the Asymmetry-Position Pick-Off Unit (APPU) (Ref. TASK 27-5118-000-001)
- for the Feed-Back Position Pick-Off Unit (FPPU) (Ref. TASK 27-5119-000-001)



EFF :
ALL
 27-51-00



AIJ




Page 529
May 01/09

- for the Instrumentation Position Pick-Off Unit (IPPU)


27-55-11-000-001)
- for the Asymmetry-Position Pick-Off Unit (APPU) (Ref.
18-000-001)
- for the Feed-Back Position Pick-Off Unit (FPPU) (Ref.
19-000-001)
- for the Instrumentation Position Pick-Off Unit (IPPU)
27-85-11-000-001).

(Ref. TASK
TASK 27-81TASK 27-81(Ref. TASK

4. Procedure
_________
(Ref. Fig. 501/TASK 27-51-00-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-00-820-050
A. Manual Adjustment of the Position Pick-Off Units
(1) Unlock the locking plate of the drive shaft of the PPU.
(2) Make sure that the drive shaft turns freely.
(3) Turn the input shaft and align the drive gear zero mark and the
orange zero indicator with the fixed pointers.
(4) Make sure that the input shaft zero mark and the fixed zero mark are
aligned.
NOTE : The mechanical zero position and the electrical zero position
____
are the same.
(5) If the PPU is not to be immediately installed:
R

(a) Install a TIE WRAP behind the locking plate.

(b) Attach a LABEL - ADHESIVE, INOP to the PPU to tell persons that
the PPU is locked in the zero position.



EFF :
ALL
 27-51-00



AIJ




Page 530
May 01/11

Position Pick-off Unit


Figure 501/TASK 27-51-00-991-003



EFF :
ALL
 27-51-00



AIJ




Page 531
Feb 01/11

5. Close-up
________
Subtask 27-51-00-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable Position Pick-off Unit (PPU):
- for the Asymmetry-Position Pick-Off Unit (APPU) (Ref.
18-400-001)
- for the Feed-Back Position Pick-Off Unit (FPPU) (Ref.
19-400-001)
- for the Instrumentation Position Pick-Off Unit (IPPU)
27-55-11-400-001)
- for the Asymmetry-Position Pick-Off Unit (APPU) (Ref.
18-400-001)
- for the Feed-Back Position Pick-Off Unit (FPPU) (Ref.
19-400-001)
- for the Instrumentation Position Pick-Off Unit (IPPU)
27-85-11-400-001).

TASK 27-51TASK 27-51(Ref. TASK


TASK 27-81TASK 27-81(Ref. TASK

Subtask 27-51-00-942-076
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 532
Feb 01/07

TASK 27-51-00-710-002
Operational Test of the Flap Interconnecting Strut and the Flap-Attachment
Failure-Detection Sensors
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275100-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices
1 ACCESS PLATFORM 4M (13 FT)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 15-007

AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)



EFF :
ALL
 27-51-00



AIJ




Page 533
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2

cotter pins

27-51-05 01 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002

R
R

27-50-00-866-008
27-50-00-866-009
27-51-44-820-001
27-54-61-000-002
27-54-61-400-006
29-10-00-863-001
29-10-00-863-002
29-10-00-864-001
29-10-00-864-002
29-14-00-614-001
31-32-00-860-006
31-60-00-860-001
31-60-00-860-002
27-51-00-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurization of the Hydraulic Reservoirs
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
EIS Start Procedure
EIS Stop Procedure
Fig. 502

3. __________
Job Set-up
(Ref. Fig. 502/TASK 27-51-00-991-004)
Subtask 27-51-00-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in position to tell persons not to operate
the flight controls.



EFF :
ALL
 27-51-00



AIJ




Page 534
Feb 01/08

Flap Interconnecting Strut


Figure 502/TASK 27-51-00-991-004



EFF :
ALL
 27-51-00



AIJ




Page 535
Feb 01/11

Subtask 27-51-00-860-056
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the flight controls (F/CTL) page on the MCDU (Ref. TASK
31-32-00-860-006).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).
(4) Move the flaps:
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(a) Extend the flaps to the 10 degrees position (slat and flap
control lever position 1) (Ref. TASK 27-50-00-866-008).
R
R

(5) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever.
(6) Depressurize the Green and the Yellow hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(7) Depressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00614-001).
Subtask 27-51-00-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-00



AIJ




Page 536
Aug 01/07

Subtask 27-51-00-010-051
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the wing at
zones 580 and 680.
(2) Remove the lower kink seals of the two wings (Ref. TASK 27-54-61-000002).
Subtask 27-51-00-020-051
E. Disconnect the Interconnecting Strut
(1) Make a mark on the interconnecting strut (1) for correct position of
the actuating rod (holes in the eye-end and bracket are aligned).
(2) Hold the flap interconnecting struts (1).
(3) Remove and discard the cotter pins (2).
(4) Remove the nuts (3), the washer (4) and the bolts (5).
Subtask 27-51-00-865-058
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-00-865-061
G. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM
1GA
C09
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY
52GA
Q34



EFF :
ALL
 27-51-00



AIJ




Page 537
Feb 01/11

4. Procedure
_________
Subtask 27-51-00-710-056
A. Operational Test of the Flap Interconnecting Strut and the
Flap-Attachment Failure-Detection Sensors
NOTE : Use one of the Multipurpose Control and Display Units (MCDU) for
____
the test.
(1) Do this test:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. At the LH flaps:
At the LH flap interconnecting strut:
- push in the actuating rod of the - the sensors give a target far
flap interconnecting strut until
signal to the SFCC.
it comes in contact with the
stop.
In the cockpit:
- a single chime sounds
- an amber MASTER CAUT light comes on.
On the upper ECAM DU:
- the F/CTL FLAPS LOCKED message comes
on
- the ALIGNMENT FAULT message comes on.
2. On Panel 130VU (131VU):
- push (in) the MASTER CAUT
pushbutton switch (P/BSW).

On Panel 130VU (131VU):

3. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the SFCC 1 menu shows.

- the amber MASTER CAUT light goes out.

NOTE : As an alternative, you can use the SFCC 2 menu but do not change SFCC
____
menus during the test procedure.
4. Push the line key SYSTEM STATUS
FLP >.

- SFCC 1 SYSTEM STATUS FLAP CHECK LH


DRIVE INTEGRITY shows.



EFF :
ALL
 27-51-00



AIJ




Page 538
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------5. Push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is shown.
6. At the LH flaps:
- move the actuating rod into the
correct position.
7. Open the circuit breakers 6CV and
8CV.

The SFCC 1 and SFCC 2 are de-energized.

8. Close the circuit breakers 6CV and The failure conditions are reset.
8CV.
On the upper ECAM DU:
- the F/CTL FLAPS LOCKED message goes
out
- the ALIGNMENT FAULT message goes out.
9. Push the line key F/CTL >.

- the SYSTEM REPORT/TEST - F/CTL menu


shows.

10. Push the line key < SFCC 1.

- the SFCC 1 menu shows.

NOTE : As an alternative, you can use the SFCC 2 menu but do not change
____
SFCC menus during the test procedure.
11. Push the line key SYSTEM STATUS
FLP >.

- the MCDU shows SFCC 1 SYSTEM STATUS


FLAP NO FAULTS.

12. Push the line key < RETURN


frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
13. At the LH flaps:
- pull out the actuating rod of
the flap interconnecting strut
until it comes in contact with
the stop.

At the LH flap interconnecting strut:


- the sensors give a target far
signal to the SFCC.

In the cockpit:
- a single chime sounds
- an amber MASTER CAUT light comes on.



EFF :
ALL
 27-51-00


R 
AIJ




Page 539
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the upper ECAM DU:
- the F/CTL FLAPS LOCKED message comes
on
- the ALIGNMENT FAULT message comes on.
14. On Panel 130VU (131VU):
- push (in) the MASTER CAUT
P/BSW.

On Panel 130VU (131VU):


- the amber MASTER CAUT light goes out.

15. Push the line key F/CTL >.

- the SYSTEM REPORT/TEST - F/CTL menu


shows.

16. Push the line key < SFCC 1.

- the SFCC 1 menu shows.

NOTE : As an alternative, you can use the SFCC 2 menu but do not change
____
SFCC menus during the test procedure.
17. Push the line key SYSTEM STATUS
FLP >.

- the MCDU shows SFCC 1 SYSTEM STATUS


FLAP CHECK LH DRIVE INTEGRITY.

18. Push the line key < RETURN


frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
19. At the LH flaps:
- move the actuating rod into the
correct position.
20. Open the circuit breakers 6CV and The SFCC 1 and SFCC 2 are de-energized.
8CV.
21. Close the circuit breakers 6CV
and 8CV.

The failure conditions are reset.


On the upper ECAM DU:
- the F/CTL FLAPS LOCKED message goes
out
- the ALIGNMENT FAULT message goes out.

22. Push the line key F/CTL >.

- the SYSTEM REPORT/TEST - F/CTL menu


shows.

23. Push the line key < SFCC 1.

- the SFCC 1 menu shows.



EFF :
ALL
 27-51-00


R 
AIJ




Page 540
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------NOTE : As an alternative, you can use the SFCC 2 menu but do not change
____
SFCC menus during the test procedure.
24. Push the line key SYSTEM STATUS
FLP >.

- the MCDU shows SFCC 1 SYSTEM STATUS


FLAP NO FAULTS.

25. Push the line key < RETURN


frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
26. Do the steps 1 thru 25 again for
the RH flap interconnecting
strut.
27. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
5. Close-up
________
Subtask 27-51-00-865-059
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-00-420-053
B. Connect the Interconnecting Strut
(1) Hold the rod eye-ends of the interconnecting struts in position to
the outer flaps.
(2) Install the bolts (5), the washer (4) and the nuts (3).
(3) TORQUE the nuts (3) to between 1.1 and 1.7 m.daN (97.34 and 150.44
lbf.in).
(4) Install the new cotter pins (2).



EFF :
ALL
 27-51-00


R 
AIJ




Page 541
Feb 01/07

(5) Do a check of the adjustment of the interconnecting strut and if


necessary adjust the interconnecting strut (Ref. TASK 27-51-44-820001).
(6) Apply
- The
- The
- The
- The

a layer of the STORAGE PRESERVATION (Material No. 15-007) to:


head of the bolt (5)
nut (3)
washer (4)
cotter pin (2).

Subtask 27-51-00-410-051
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the lower kink seals of the two wings (Ref. TASK 27-54-61400-006).
Subtask 27-51-00-865-060
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-00-860-055
E. Aircraft Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2910-00-863-001) and (Ref. TASK 29-10-00-863-002).
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-51-00


R 
AIJ




Page 542
Feb 01/07

Subtask 27-51-00-942-067
F. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 543
Feb 01/07

TASK 27-51-00-750-001
R

Automatic Integrity Test of the Slat and Flap Control Computers


WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-51-00-740-002
27-81-00-740-002
31-32-00-860-006

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Bite Test of the Slat and Flap Control Computers
(Flap System)
Bite Test of the Slat and Flap Control Computers
(Slat System)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page



EFF :
ALL
 27-51-00



AIJ




Page 544
Aug 01/11

3. __________
Job Set-up
Subtask 27-51-00-941-073
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-51-00-860-058
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the flight controls (F/CTL) page on the MCDU (Ref. TASK
31-32-00-860-006).
Subtask 27-51-00-865-071
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-51-00-750-050
A. Automatic Integrity Test of the Slat and Flap Control Computers
NOTE : Use the Multipurpose Control Display Unit (MCDU) 3 on panel 1VU
____
for the test. If the MCDU 3 is defective use the MCDU 2 on panel
11VU.



EFF :
ALL
 27-51-00


R 
AIJ




Page 545
Feb 01/07

(1) Wait 15 seconds to make sure that the two SFCCs are in operation
before you do the test.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

2. Push the line key SYSTEM STATUS


FLP >

- the MCDU shows SYSTEM STATUS FLP


NO FAULTS

3. Push the line key < RETURN


4. Push the line key < SLT SYSTEM
STATUS

- the MCDU shows SYSTEM STATUS SLT


NO FAULTS

5. Push the line key < RETURN


frequently until the MCDU shows
the SYSTEM REPORT/TEST
F/CTL menu.
6. Do the bite test of the SFCC
(Ref. TASK 27-81-00-740-002) and
(Ref. TASK 27-51-00-740-002).
7. Push the line key < SFCC 2.

- the MCDU shows the SFCC 2 menu.

8. Do the SFCC test as described


above with the SFCC 2 menu.
9. Push the line key < RETURN
frequently until the CFDS MENU
page is shown.
10. Do the bite test of the SFCC
(Ref. TASK 27-81-00-740-002) and
(Ref. TASK 27-51-00-740-002).



EFF :
ALL
 27-51-00



AIJ




Page 546
Feb 01/11

5. Close-up
________
Subtask 27-51-00-862-054
A. De-energize the Electrical Circuits
(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-51-00-942-077
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 547
Feb 01/07

TASK 27-51-00-820-003
To do a Check of the Flap Rigged Position (with the Sharks Fin)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
NOTE : If the label with the asymmetric offset value on the track 3 is missing
____
or unreadable, refer to SB 27-1034 or SIL 27-155.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
460005835
98D27504038001
98D27508625000

safety barriers
warning notice
access platform(s) 3 m (9 ft. 10 in.)
1 SLEEVE - GROUND LOCK
1 KIT-FLAP RIGGING
1 CHECK-PIN TRACK 1-4



EFF :
ALL
 27-51-00



AIJ




Page 548
Feb 01/08

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

98D27508655000

1 RIG-SCALE,FLAP

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------07-11-00-581-001
27-50-00-866-009
27-51-00-820-008
27-54-00-820-001
32-12-00-010-001
32-12-00-410-001
57-55-11-010-001
57-55-11-010-002
57-55-11-410-001
57-55-11-410-002
R
R
R
R
R

27-51-00-991-056
27-51-00-991-103
27-51-00-991-057
27-51-00-991-065
27-51-00-991-058
27-51-00-991-060

Lifting for Aircraft Maintenance Operations


Retraction of the Flaps on the Ground
Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Adjustment of the Flap Drive System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
To Lower the Flap Track No. 2 Movable Fairing for
Access
To Lower the Flap Track No. 3 & No. 4 Movable
Fairings for Access
To Lift the Flap Track No. 2 Movable Fairing after
Access
To Lift the Flap Track No. 3 & No. 4 Movable Fairings
after Access
Fig. 503
Fig. 504
Fig. 505
Fig. 506
Fig. 507
Fig. 508

3. __________
Job Set-up
Subtask 27-51-00-941-061
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat controls.



EFF :
ALL
 27-51-00



AIJ




Page 549
May 01/10

Subtask 27-51-00-860-059
B. Aircraft Maintenance Configuration
(1) Make sure that:
- the fuel quantities in the wing tanks are symmetrical or that the
wing tanks are empty
- two engines are installed
or
- no engines are installed.
(2) Make sure that the aircraft weight is:
- on the landing gear (weight on wheels)
or
- on jacks (Ref. TASK 07-11-00-581-001).
(3) Make sure that the flaps are in the fully retracted position
(Ref. TASK 27-50-00-866-009).
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever.
Subtask 27-51-00-865-075
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-00-010-055
D. Get Access
(1) Open the applicable MLG door (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(3) Put the access platform(s) below the applicable inboard and outboard
flaps.
(4) Lower the flap track No. 2 movable fairing (Ref. TASK 57-55-11-010001).



EFF :
ALL
 27-51-00



AIJ




Page 550
Feb 01/08

(5) Lower the flap track No. 3 and the flap track No. 4 movable fairings
(Ref. TASK 57-55-11-010-002).
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-00-480-051-A
R

A. Installation of the Rigging Tools


(Ref. Fig. 503/TASK 27-51-00-991-056, 504/TASK 27-51-00-991-103)
(1) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the track 1 to 4
position.
(a) If you cannot insert the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the flap drive system (Ref. TASK 27-54-00-820-001).
(2) Install the KIT-FLAP RIGGING (98D27504038001):
- for the inboard flap, on the flap track 2 beam assembly
- for the outboard flap, on the flap track 3 beam assembly and on the
flap track 4 assembly.
(a) Install the base assembly (15) on the flap track beam (18). Make
sure that the aft dowels (14) touch the track beam end-stop (13).
(b) Move the two lower clamps (16) into position below the flap track
beam (18) and tighten the knurled screws (17).
(c) Move the fin (11) into position on the base assembly (15) and
install the pin (12).

R
R

(d) Put the scale block (19) in position on the fin (11).



EFF :
ALL
 27-51-00



AIJ




Page 551
May 01/11

Installation of the Flap Rigging Kit


Figure 503/TASK 27-51-00-991-056



EFF :
ALL
 27-51-00



AIJ




Page 552
Feb 01/11

R
R

Installation of the Check Pin Track 1-4


Figure 504/TASK 27-51-00-991-103



EFF :
ALL
 27-51-00



AIJ




Page 553
May 01/10

Subtask 27-51-00-220-056
B. To do a Check of the Inboard Flap Rigged Position
(Ref. Fig. 505/TASK 27-51-00-991-057, 506/TASK 27-51-00-991-065)
NOTE : The tolerances given in the work steps that follow are in-service
____
tolerances only. They are not initial adjustment tolerances.
The tolerances for initial adjustment are given in the flap rigged
position adjustment procedure (Ref. TASK 27-51-00-820-008).
(1) At the track 2 position:
(a) Do a check of the datum position of the top surface of the flap
trailing edge.
1
_

Make sure that the value shown on the scale block (30) (the
datum position of the top surface of the flap trailing edge)
is the same as the value shown on the label (45).

2
_

If there is no value shown on the label (45), or the label is


not attached to the flap arm:
- make sure that the top surface of the flap trailing edge
aligns with the zero position on the scale block (30).
NOTE : The scale must be read from the outboard side of the
____
flap track beam.

(2) At the inboard end of the flap, measure:


- the dimension E (between the shroud-box trailing edge lower surface
and the flap upper surface at the WX500 position). This must be
between 1.5 mm (0.06 in.) and 11 mm (0.43 in.).
(3) If the flap rigged position is not correct, adjust as necessary until
the flap is in the specified limits.
Subtask 27-51-00-220-057
R

C. To do a Check of the Outboard Flap Rigged Position


(Ref. Fig. 506/TASK 27-51-00-991-065, 507/TASK 27-51-00-991-058, 508/TASK
27-51-00-991-060)
NOTE : The tolerances given in the work steps that follow are in-service
____
tolerances only. They are not initial adjustment tolerances.
The tolerances for initial adjustment are given in the flap rigged
position adjustment procedure (Ref. TASK 27-51-00-820-008).



EFF :
ALL
 27-51-00



AIJ




Page 554
May 01/11

Inboard Flap Rigging Dimensions


Figure 505/TASK 27-51-00-991-057



EFF :
ALL
 27-51-00



AIJ




Page 555
Feb 01/11

Label Positions - Flap Track Beams and Flap Arms


Figure 506/TASK 27-51-00-991-065



EFF :
ALL
 27-51-00



AIJ




Page 556
Feb 01/11

Outboard Flap Rigging Dimensions


Figure 507/TASK 27-51-00-991-058



EFF :
ALL
 27-51-00



AIJ




Page 557
Feb 01/11

Label Position - Flap Track Beam


Figure 508/TASK 27-51-00-991-060



EFF :
ALL
 27-51-00



AIJ




Page 558
Feb 01/11

NOTE : You must read the scale from the outboard side of the flap track
____
beam.
(1) At track 3 and track 4, make sure that the top surface of the flap
trailing edge aligns with the scale block (41) as follows:
(a) Do a check of the values shown on the labels (43) and (45).
NOTE : The label (43) is attached to the outboard side of the
____
flap track beam 3. The label (45) is attached to the flap
arm of each track.
(b) At track 3:

R
R

1
_

Add the values on the label (43) at the track 3 and the label
(45) at the track 3 together. Do this to get the correct datum
position of the flap trailing edge. This value +/- 4 mm
(0.1574 in.) is the value shown on the scale block (41).

2
_

If there is no value shown on the label (45), or there is no


label (45) attached to the flap arm:
- make sure that the value shown on the label (43) +/- 4 mm
(0.1574 in.) is the value shown at the scale block (41).

3
_

If the sum of the values of label (43) and (45) is larger than
6 mm (0.2362 in.) use RIG-SCALE,FLAP.

(c) At track 4:

R
R

1
_

Add the values on the label (43) at the track 3 and the label
(45) at the track 4 together. Do this to get the correct datum
position of the flap trailing edge. This value +/- 4 mm
(0.1574 in.) is the value shown on the scale block (41).

2
_

If there is no value shown on the label (45), or there is no


label (45) attached to the flap arm:
- make sure that the value shown on the label (43) +/- 4 mm
(0.1574 in.) is the value shown at the scale block (41).

3
_

If the sum of the values of label (43) and (45) is larger than
6 mm (0.2362 in.) use RIG-SCALE,FLAP.

(2) If the flap rigged position is not correct, adjust as necessary until
the flap is in the specified limits (Ref. TASK 27-51-00-820-008).



EFF :
ALL
 27-51-00



AIJ




Page 559
May 01/11

Subtask 27-51-00-080-050-A

D. Removal of the Rigging Tools

R
R
R
R
R

(1) Remove the KIT-FLAP RIGGING (98D27504038001) and the RIG-SCALE,FLAP


(98D27508655000):
(Ref. Fig. 503/TASK 27-51-00-991-056)
- for the inboard flap, from the flap track 2 beam assembly
- for the outboard flap, from the flap track 3 beam assembly.

R
R

(a) Remove the pin (12) and remove the fin (11) from the base
assembly (15).

(b) Hold the base assembly (15) and loosen the knurled screws (17).

R
R
R
R

(c) Move the two lower clamps (16) away from the flap track beam (18)
and remove the base assembly (15).
(Ref. Fig. 504/TASK 27-51-00-991-103)

(2) Remove the CHECK-PIN TRACK 1-4 from the track 1 to 4 position.
5. Close-up
________
Subtask 27-51-00-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Lift the flap track No. 2 movable fairing (Ref. TASK 57-55-11-410001).
(3) Lift the flap track No. 3 movable fairing (Ref. TASK 57-55-11-410002).
(4) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
from the flap/slat control lever.
(5) Remove the SLEEVE - GROUND LOCK from the applicable MLG door
actuator.
(6) Close the applicable MLG door (Ref. TASK 32-12-00-410-001).



R
EFF :
ALL
 27-51-00



AIJ




Page 560
May 01/10

Subtask 27-51-00-942-062
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 561
Feb 01/07

TASK 27-51-00-820-004
Adjustment of the Forward Eccentrics to the Datum Position
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
98D27508655000
98D27803500001

safety barriers
warning notice
1 RIG-SCALE,FLAP
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-51-00



AIJ




Page 562
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-51-00-820-008
R
R

27-51-00-991-015
27-51-00-991-070

Retraction of the Flaps on the Ground


Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Fig. 509
Fig. 510

3. __________
Job Set-up
Subtask 27-51-00-941-067
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat controls.
Subtask 27-51-00-860-060
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) You can do this adjustment with the aircraft on jacks or with the
aircraft weight on the landing gear.
(2) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever.



EFF :
ALL
 27-51-00



AIJ




Page 563
May 01/10

4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
R

Subtask 27-51-00-480-052-A

A. Preparation for Adjustment of the Forward Eccentrics

R
R
R

(1) At the track 3 and track 4 positions, install the sharks fin flap
rigging kit (Ref. TASK 27-51-00-820-008) and the RIG-SCALE,FLAP
(98D27508655000).

R
R

NOTE : Do not use the scale block from the rigging kit. Use the
____
additional scale block (RIG-SCALE,FLAP (98D27508655000).
Subtask 27-51-00-820-053
B. Adjustment of the Forward Eccentrics
(Ref. Fig. 509/TASK 27-51-00-991-015, 510/TASK 27-51-00-991-070)

(1) Remove and discard the cotter pin (5) from the nut (4).
(2) At track 3, remove the nut (4), the washer (3), the bolt (1) and the
serrated plate (2).
(3) At track 4, remove the bolt (7), the washer (8) and the serrated
plate (9).
(4) Adjust the forward eccentrics (6) and (10) in sequence by the amount
shown on the label (41) attached to the flap track beam 3. Make sure
that the adjustments are in small equal increments, to move the flap
deflection by the same amount.
NOTE : Flap movement is opposite to
____
attached to the flap track 3
label value the flap must be
label value the flap must be

the value shown on the label


beam assembly. For an up or +
moved down. For a down or -
moved up.



EFF :
ALL
 27-51-00



AIJ




Page 564
May 01/10

Forward Eccentrics - Location and Detail


Figure 509/TASK 27-51-00-991-015



EFF :
ALL
 27-51-00



AIJ




Page 565
Feb 01/11

Label Positions - Flap Track 2, 3 and 4


Figure 510/TASK 27-51-00-991-070



EFF :
ALL
 27-51-00



AIJ




Page 566
Feb 01/11

(5) At track 3, temporarily install the serrated plate (2) with the bolt
(1), the washer (3) and the nut (4).
(a) Make sure that the top surface of the flap trailing edge is
aligned with the value on the label (43). Make sure that you use
the value of the label (43) at the track 3.
(b) If there is no value shown on the label (43), or there is no
label attached to the flap arm:
- align the top surface of the trailing edge with the zero mark
on the scale block of the shark fin tool.
(6) At track 4, temporarily install the serrated plate (9) with the bolt
(7) and the washer (8).
(a) Make sure that the top surface of the flap trailing edge is
aligned with the value on the label (43). Make sure that you use
the value of the label (43) at the track 4.
(b) If there is no value shown on the label (43), or there is no
label attached to the flap arm:
- align the top surface of the trailing edge with the zero mark
on the scale block.
(7) Make sure that the punched/painted marks on the forward eccentrics
align.
R

(8) Remove the sharks fin flap rigging kit and the scale block RIGSCALE,FLAP (98D27508655000)
(Ref. TASK 27-51-00-820-008).
5. Close-up
________
Subtask 27-51-00-942-068
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-51-00



AIJ




Page 567
Nov 01/10

(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page 568
May 01/10

TASK 27-51-00-820-008
Adjustment of the Flap Rigged Position with the Sharks Fin Tool (A318/319/320)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
NOTE : If the label with the asymmetric offset value on the track 3 is missing
____
or unreadable, refer to SB 27-1034 or SIL 27-155.
1. __________________
Reason for the Job
Flap rigging is done:
- when specified in an AMM Task
- when specified in a TSM Task
- if you think the flap rigged position is incorrect.



EFF :
ALL
 27-51-00



AIJ




Page 569
Aug 01/11

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
ACCESS PLATFORM 3M (10 FT)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
PIN RIGGING-FLAPS (TRACK 1)
PIN-RIGGING, FLAPS
ADAPTER-TORQUE-TRUNNION NUT
KIT-FLAP RIGGING
TOOL-RESTRAINING, TK1
TOOL-FLAP ADJUSTING
TOOL - FLAP ADJUSTING,
RIG-SCALE,FLAP

No specific
R
R

No specific
No specific
98D27504005000
98D27504006000
98D27504035000
98D27504038001
98D27504040000
98D27504041000
98D27504082000
98D27508655000

1
3
1
3
1
1
2
1

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
Material No. 08-004A
Material No. 15-007
Material No. 19-010

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-A-46106
TYPE I
ADHESIVE SEALANT (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-51-00



AIJ




Page 570
Feb 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------52
54
92

crushable spacer
cotter pin
cotter pin

27-54-46 06B-080
27-54-46 06B-035
57-52-21 02C-040

R
D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------07-11-00-581-001

Lifting for Aircraft Maintenance Operations

27-50-00-866-012
27-51-00-820-004

Manual Retraction of the Flaps


Adjustment of the Forward Eccentrics to the Datum
Position
Adjustment of the Flap Rollers
Operational Test of the Flap System
Adjustment of the Flap Drive System
Removal of the Inboard Flap
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Inboard Flap
Installation of the Flap Kink-Seals and Cushion-Seals
Removal of the Outboard Flap
Installation of the Outboard Flap
Installation of the Flap Guide-Roller Assembly
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
To Lower the Flap Track No. 2 Movable Fairing for
Access
To Lower the Flap Track No. 3 & No. 4 Movable
Fairings for Access

27-51-00-820-010
27-54-00-710-001
27-54-00-820-001
27-54-61-000-001
27-54-61-000-002
27-54-61-400-001
27-54-61-400-006
27-54-62-000-001
27-54-62-400-001
27-54-63-400-001
57-51-37-000-002
57-51-37-000-004
57-51-37-400-002
57-51-37-400-004
57-55-11-010-001
57-55-11-010-002
SIL

27-089



EFF :
ALL
 27-51-00



AIJ




Page 571
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-00-991-070
27-51-00-991-067
27-51-00-991-095
27-51-00-991-068
27-51-00-991-069
27-51-00-991-071
27-51-00-991-072
27-51-00-991-073
27-51-00-991-074
27-51-00-991-075
27-51-00-991-076

Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.

510
511
512
513
514
515
516
517
518
519
520

R
3. __________
Job Set-up
Subtask 27-51-00-941-079
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat control lever.
Subtask 27-51-00-860-074
B. Aircraft Maintenance Configuration
(1) Make sure that:
- the fuel quantities in the wing tanks are symmetrical or that the
wing tanks are empty
- two engines are installed
or
- no engines are installed.
(2) Make sure that the aircraft weight is:
- on the landing gear (weight on wheels)
or
- on jacks (Ref. TASK 07-11-00-581-001).



EFF :
ALL
 27-51-00



AIJ




Page 572
Aug 01/11

Subtask 27-51-00-865-101
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-00-010-063
D. Get Access
R
(1) Put the ACCESS PLATFORM 3M (10 FT) below the applicable inboard or
outboard flap.
(2) Remove the access panels for the applicable wing:
(a) For the LH wing, remove:
- 573AB, 573CB (Ref. TASK 57-51-37-000-002)
- 575AB (Ref. TASK 57-51-37-000-004).
(b) For the RH wing, remove:
- 673AB, 673CB (Ref. TASK 57-51-37-000-002)
- 675AB (Ref. TASK 57-51-37-000-004).
(3) For the inboard flap:
(a) Remove the fairing panels at track 1.
1
_

For the LH wing remove :


- 193BB (Ref. TASK 27-54-61-000-001).

2
_

For the RH wing remove :


- 194BB (Ref. TASK 27-54-61-000-001).

(b) Lower the flap track No. 2 movable fairing (Ref. TASK 57-55-11010-001).
(4) For the outboard flap:
(a) Lower the flap track No. 3 and the flap track No. 4 movable
fairings (Ref. TASK 57-55-11-010-002).



EFF :
ALL
 27-51-00



AIJ




Page 573
Aug 01/11

(5) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever (installed when the movable fairings were lowered).
(6) Remove the flap kink seals (Ref. TASK 27-54-61-000-002).
(7) Disconnect the interconnecting strut from the outboard flap
(Ref. TASK 27-54-62-000-001).
(8) Manually retract the flaps to the fully retracted position (Ref. TASK
27-50-00-866-012).
(9) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER on the flap/slat
control-lever.
4. Procedure
_________
Subtask 27-51-00-820-083
A. Flap Rigged Position - General
(Ref. Fig. 511/TASK 27-51-00-991-067, 512/TASK 27-51-00-991-095)
(1) Flap Rigged Position:
(a) The flap rigged position is the position that gives the correct
relation between:
- the flap trailing edge
and
- the top surface of the wing.
In this position the correct aerodynamic conditions for the best
flight performance are set.
(b) To put the flaps in their rigged position, eccentric bearings in
the attachments at the flap tracks are adjusted. At each track
there are two eccentric bearings:
- the main eccentric bearing
- the forward eccentric bearing.
(2) Main Eccentric Bearing:
- The main eccentric bearing is the spherical bearing at the flap
carriage attachment and is used for standard rigging. Movement of
this bearing causes the complete flap to move vertically in
relation to the wing.



EFF :
ALL
 27-51-00


R 
AIJ




Page 574
Aug 01/11

Flap Rigging - General


Figure 511/TASK 27-51-00-991-067


EFF :
ALL
 27-51-00


R 
AIJ




Page 575
Aug 01/11

Eccentric Bearings - General


Figure 512/TASK 27-51-00-991-095



EFF :
ALL
 27-51-00



AIJ




Page 576
Feb 01/11

(3) Forward Eccentric Bearing:


- The forward eccentric bearing is on the flap drive-arm and is
adjusted only for assymetric rigging conditions (Ref. SIL 27-089).
When this bearing is adjusted, only the trailing edge of the flap
moves (vertically) at that position.
R

Subtask 27-51-00-480-060-A

R
R

B. Install the Outboard Flap Rigging-Kit


(Ref. Fig. 511/TASK 27-51-00-991-067, 513/TASK 27-51-00-991-068, 514/TASK
27-51-00-991-069)

R
R

(1) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) (1) at the


track 1.

R
R

(2) If you cannot install the PIN-RIGGING, FLAPS do the adjustment of the
flap drive system (Ref. TASK 27-54-00-820-001).

R
R

(3) Install the PIN-RIGGING, FLAPS (98D27504006000) (7) at the track 2, 3


and 4.

R
R

(4) If you cannot install the PIN-RIGGING, FLAPS do the adjustment of the
flap drive system (Ref. TASK 27-54-00-820-001).

(5) At the track 3 and 4, install the KIT-FLAP RIGGING (98D27504038001):

R
R

(a) Install the base assembly (23) on the flap track beam (28). Make
sure that the aft dowels (25) touch the track beam end-stop (24).

R
R

(b) Move the two bottom clamps (26) into position below the flap
track beam (28) and tighten the knurled screws (27).

R
R
R
R

(c) Move the fin (21) into position in the slot on the base assembly
(23) and install the pin (22).
(Ref. Fig. 510/TASK 27-51-00-991-070)

R
R
R
R
R
R
R
R
R
R

NOTE : The label (41) shows the asymmetric offset value. This is
____
the adjustment applied to the forward eccentric bearing in
the flap drive strut at tracks 3 and 4. The adjustment is
necessary on some aircraft to give the correct aerodynamic
balance:
- a plus (+) or (up) value shows that the flap trailing
edge was moved up
- a minus (-) or (down) value shows that the flap trailing
edge was moved down



EFF :
ALL
 27-51-00



AIJ




Page 577
May 01/10

Rigging Pin Installation


Figure 513/TASK 27-51-00-991-068



EFF :
ALL
 27-51-00



AIJ




Page 578
Feb 01/11

INTENTIONALLY BLANK



R

 27-51-00



AIJ




Page 579
May 01/10

Rigging Kit Installation - Outboard Flap


Figure 514/TASK 27-51-00-991-069- 12 (SHEET 1)



EFF :
ALL
 27-51-00



AIJ




Page 580
Feb 01/11

Rigging Kit Installation - Outboard Flap


Figure 514/TASK 27-51-00-991-069- 22 (SHEET 2)



EFF :
ALL
 27-51-00



AIJ




Page 581
Feb 01/11

- a zero (0) value shows that no adjustment was necessary.

R
R

(d) Adjust the forward eccentrics to the zero datum position


(Ref. TASK 27-51-00-820-004).

R
R
R

(e) Put the scale block (20) on the fin (21):


- Do not use the scale block from the rigging kit: Use the RIGSCALE,FLAP (98D27508655000) for the adjustment procedure.
Subtask 27-51-00-820-073
C. Set the Main Eccentric Bearings of the Outboard Flap to the Zero Datum
Position

(Ref. Fig. 515/TASK 27-51-00-991-071)


NOTE : The main eccentric bearings are spherical bearings installed in
____
the flap attachment fittings at the flap carriages. A red paint
mark on each bearing and fitting shows the zero datum position.
The bearings are at the zero datum position when the red paint
marks on the bearing and fitting are aligned.
(1) On the carriage bolts (58) at the track 3 and track 4 positions:
(a) Remove and discard the cotter pin (54) from the nut (53).
(b) Remove these items:
- the nut (53)
- the crushable spacer (52)
- the nut (55) and the washer (56)
- the locking plate (51).
(2) Remove and discard the lockwire from the nuts (57) installed on the
failsafe hooks.
(3) Loosen the nuts (57).
NOTE : These are loosened to give easier movement when the eccentric
____
bearings are adjusted.
(4) At the track 3 and track 4 positions:
(a) Engage the TOOL - FLAP ADJUSTING, (98D27504082000) with the
splined bush in the flap carriage.



EFF :
ALL
 27-51-00



AIJ




Page 582
May 01/10

(b) Turn the splined bush until the red paint marks are aligned.
Adjust the bearings at one track position and then the other in
small equal increments.
NOTE : The splined bush engages with the main eccentric bearing.
____
When the bush is turned the eccentric bearing also turns.
Subtask 27-51-00-820-066
D. Adjust the Rigged Position of the Outboard Flap
R

(Ref. Fig. 510/TASK 27-51-00-991-070, 515/TASK 27-51-00-991-071, 516/TASK


27-51-00-991-072)
(1) Use the TOOL FLAP ADJUSTING to adjust the main eccentric bearings.
Adjust the bearings at one track then at the other in small, equal
increments.
(2) At the track 3 and the track 4, adjust the main eccentric bearings
until:
- the top surface of the flap trailing edge aligns with the scale
block (20) as follows.
(a) Do a check of the values shown on the labels (43).
NOTE : The label (43) is attached to the flap arm of each track.
____
(b) At the track 3:
1
_

Align the top surface of the flap trailing edge with the value
on the scale block (20). This value is the value of the label
(43) at the track 3 +/- 1 mm (0.0393 in.).
NOTE : You must look inboard from the outside of the flap
____
track beam when you read the scale block.

2
_

If there is no value shown on the label (43), or there is no


label attached to the flap arm:
- align the top surface of the flap trailing edge with the
zero mark +/- 1 mm (0.0393 in.) on the scale block (20).

(c) At the track 4:


1
_

Align the top surface of the flap trailing edge with the value
on the scale block (20). This value is the value of the label
(43) at the track 4 +/- 1 mm (0.0393 in.).



EFF :
ALL
 27-51-00



AIJ




Page 583
May 01/10

Main Eccentric Bearing - Adjustment, Track 2, 3 and 4


Figure 515/TASK 27-51-00-991-071- 12 (SHEET 1)



EFF :
ALL
 27-51-00



AIJ




Page 584
Feb 01/11

Main Eccentric Bearing - Adjustment, Track 2, 3 and 4


Figure 515/TASK 27-51-00-991-071- 22 (SHEET 2)



EFF :
ALL
 27-51-00



AIJ




Page 585
Feb 01/11

Rigging Dimensions - Outboard Flap


Figure 516/TASK 27-51-00-991-072- 12 (SHEET 1)



EFF :
ALL
 27-51-00



AIJ




Page 586
Feb 01/11

Rigging Dimensions - Outboard Flap


Figure 516/TASK 27-51-00-991-072- 22 (SHEET 2)



EFF :
ALL
 27-51-00



AIJ




Page 587
Feb 01/11

NOTE : You must look inboard from the outside of the flap
____
track beam when you read the scale block.
2
_

If there is no value shown on the label (43), or there is no


label attached to the flap arm:
- align the top surface of the flap trailing edge with the
zero mark +/- 1 mm (0.0393 in.) on the scale block (20).

Subtask 27-51-00-420-073
E. Remove the Adjusting Tools from the Main Eccentric Bearings of the
Outboard Flap
R

(Ref. Fig. 515/TASK 27-51-00-991-071)


(1) Remove the TOOL - FLAP ADJUSTING, from the splined bush in the flap
carriage at track 3 and track 4.
(2) At the track 3 and track 4 positions do as follows:
(a) On the carriage bolt (58) install these items:
- the locking plate (51) (make sure that the main eccentric
bearing, the splined bush and the locking plate (51) are
correctly engaged)
- a new crushable spacer (52)
- the nut (53).
(b) TORQUE the nut (53) to between 15 and 20 m.daN (110.61 and 147.49
lbf.ft).
(c) Safety the nut (53) with a new cotter pin (54).
(d) Install the washer (56) and the nut (55).
(e) TORQUE the nuts (57) on the failsafe hooks to 0.12 m.daN (10.61
lbf.in) maximum.
(f) Safety the nuts (57) with lockwire, MISCELLANEOUS (Material No.
19-010).



EFF :
ALL
 27-51-00



AIJ




Page 588
May 01/10

Subtask 27-51-00-820-074
F. Complete the adjustment of the Rigged Position of the Outboard Flap
(Ref. Fig. 510/TASK 27-51-00-991-070)

(1) If applicable, adjust the forward eccentrics back to the value shown
on the labels (41) and (43). Adjust the forward eccentrics at the
track 3 and 4 in sequence (in small equal increments) as follows:
NOTE : You must read the scale from the outboard side of the flap
____
track beam.
(a) At track 3 and track 4, make sure that the top surface of the
flap trailing edge aligns with the scale block (41) as follows:
1
_

Do a check of the values shown on the labels (41) and (43).


NOTE : The label (41) is attached to the outboard side of the
____
flap track beam 3. The label (43) is attached to the
flap arm of each track.

2
_

At the track 3:
a
_

Add the values on the label (41) at the track 3 and the
label (43) at the track 3 together. Do this to get the
correct datum position of the flap trailing edge. This
value +/- 1 mm (0.0393 in.) is the value shown on the scale
block (20).
NOTE : For a (+) or (up) value, the datum position is above
____
the zero line on the scale block (20).
For a (-) or (down) value, the datum position is
below the zero line of the scale block (20).
NOTE : The scale block has 1 millimeter graduations.
____

b
_

3
_

If there is no value shown on the label (43), or there is


no label (43) attached to the flap arm:
- make sure that the value shown on the label (41) +/- 1 mm
(0.0393 in.) is the value shown at the scale block (20).

At track 4:
a
_

Add the values on the label (41) at the track 3 and the
label (43) at the track 4 together. Do this to get the
correct datum position of the flap trailing edge. This



EFF :
ALL
 27-51-00



AIJ




Page 589
May 01/10

value +/- 1 mm (0.0393 in.) is the value shown on the scale


block (20).
NOTE : For a (+) or (up) value, the datum position is above
____
the zero line on the scale block (20).
For a (-) or (down) value, the datum position is
below the zero line of the scale block (20).
NOTE : The scale block has 1 millimeter graduations.
____
b
_

If there is no value shown on the label (43), or there is


no label (43) attached to the flap arm:
- make sure that the value shown on the label (41) +/- 1 mm
(0.0393 in.) is the value shown at

(b) Safety the outboard flap forward eccentrics (Ref. TASK 27-54-62400-001).
R

(Ref. Fig. 514/TASK 27-51-00-991-069)


(2) At track 3 and track 4, remove the KIT-FLAP RIGGING:
(a) Remove the scale block (20).
(b) Remove the pin (22) and remove the fin (21) from the base
assembly (23).
(c) Loosen the knurled screws (27) and remove the base assembly (23)
from the flap track beam (28).
(3) Measure the clearance of the flap guide-roller and adjust if
necessary (Ref. TASK 27-54-63-400-001).

Subtask 27-51-00-480-061-A

R
R

G. Install the Inboard Flap Rigging-Kit


(Ref. Fig. 513/TASK 27-51-00-991-068, 517/TASK 27-51-00-991-073)

R
R

(1) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) (1) in the


drive-lever (5) at track 1.

R
R

(2) At the track 1 position, install the TOOL-RESTRAINING, TK1


(98D27504040000).

R
R

(a) Put the body assembly (64) in position on the flap track beam
(62).



EFF :
ALL
 27-51-00



AIJ




Page 590
May 01/10

(b) Connect the stop (66) to the flap carriage (60).


(c) Install the spigot (61) through the flap track beam (62) into the
body assembly (64).
(d) Adjust the screw (65) with the knob (63) until the flap carriage
(60) is held in position.
(3) At the track 2 position, install the KIT-FLAP RIGGING
(98D27504038001):
(a) Install the base assembly (71) on the flap track beam (76). Make
sure that the aft dowels (73) touch the track beam end-stop (72).
(b) Move the two bottom clamps (74) into position below the flap
track beam (76) and tighten the knurled screws (75).
(c) Move the fin (69) into position on the base assembly (71) and
install the pin (70).
(d) Put the scale block (68) on the fin (69):
- Do not use the scale block from the rigging kit: Use the RIGSCALE,FLAP (98D27508655000) for the adjustment procedure.

(4) Disconnect the flap drive-arm (4) and the rotary actuator drive-lever
(5) at the track 1 position (Ref. TASK 27-54-61-000-001).
Subtask 27-51-00-820-075
H. Set the Main Eccentric Bearings of the Inboard Flap to the Zero Datum
Position
(Ref. Fig. 515/TASK 27-51-00-991-071, 518/TASK 27-51-00-991-074)
NOTE : The main eccentric bearings are spherical bearings installed in
____
the flap attachment fittings at the flap carriages.
At track 1, an eccentric bush (86) is installed in the bearing
(87). A pin on the eccentric bush (86) engages with the toothplate
(85). The bearing (87) is at zero datum when the pin on the
eccentric bush (86) is at the position shown
(Ref. Fig. 518/TASK 27-51-00-991-074)
Detail D.
At track 2, red paint marks on the bearing and on the fitting show
the zero datum position. The bearing is at the zero datum position
when the red paint marks are aligned.



EFF :
ALL
 27-51-00



AIJ




Page 591
Nov 01/10

Rigging Kit Installation - Inboard Flap


Figure 517/TASK 27-51-00-991-073- 12 (SHEET 1)



EFF :
ALL
 27-51-00



AIJ




Page 592
Feb 01/11

Rigging Kit Installation - Inboard Flap


Figure 517/TASK 27-51-00-991-073- 22 (SHEET 2)



EFF :
ALL
 27-51-00



AIJ




Page 593
Feb 01/11

Main Eccentric Bearing Adjustment - Track 1


Figure 518/TASK 27-51-00-991-074- 12 (SHEET 1)



EFF :
ALL
 27-51-00



AIJ




Page 594
Feb 01/11

Main Eccentric Bearing Adjustment - Track 1


Figure 518/TASK 27-51-00-991-074- 22 (SHEET 2)



EFF :
ALL
 27-51-00



AIJ




Page 595
Feb 01/11

(Ref. Fig. 515/TASK 27-51-00-991-071)


Adjust the bearings at one position then the other in small
increments.
(1) At the track 1 position, set the main eccentric bearing to the zero
datum position as follows:
(a) Remove these items:
- the bolt (80)
- the tabwasher (81)
- the stop (82)
- the nut (83)
- the lockwasher (84)
- the toothplate (85).
(b) Use the TOOL-FLAP ADJUSTING (98D27504041000) to move the
eccentric bush (86) to the position shown.
(Ref. Fig. 518/TASK 27-51-00-991-074)
Detail D.

(2) At the track 2 position, set the main eccentric bearing to the zero
datum position as follows:
R

(Ref. Fig. 515/TASK 27-51-00-991-071)


(a) Remove and discard the lockwire from the nuts (57) installed on
the failsafe hooks.
(b) Loosen the nuts (57).
NOTE : These nuts must be loose to make sure that the movement is
____
easy when you adjust the eccentric bearings.
(c) Remove and discard the cotter pin (54) from the nut (53).
(d) Remove these items:
- the nut (53)
- the crushable spacer (52)
- the nut (55) and the washer (56)
- the locking plate (51).
(e) Engage the TOOL - FLAP ADJUSTING, (98D27504082000) with the
splined bush in the flap carriage.



EFF :
ALL
 27-51-00



AIJ




Page 596
May 01/10

(f) Turn the splined bush until the red paint marks are aligned.
NOTE : The splined bush engages with the main eccentric bearing.
____
When you turn the bush, the eccentric bearing also turns.
R

Subtask 27-51-00-820-067-A

R
R

J. Adjust the Rigged Position of the Inboard Flap


(Ref. Fig. 510/TASK 27-51-00-991-070, 517/TASK 27-51-00-991-073, 519/TASK
27-51-00-991-075)

(1) Make sure that scale block (68) is in position on the fin (69).

R
R
R

(2) Use the TOOL FLAP ADJUSTING to adjust the main eccentric bearings.
Adjust the bearings at one track position then the other in small
increments.

R
R

(3) At the track 1 and the track 2 positions, adjust the main eccentric
bearings until:

R
R
R
R
R

(a) At track 2, the top surface of the flap aligns with the value
shown on the scale block (68) and the label (43). The value shown
on the scale block (68) (the datum position of the top surface of
the flap trailing edge) is the same as the value shown on the
label (43).

R
R

NOTE : You must look inboard from the outside of the flap track
____
beam when you read the scale block.

R
R
R
R

(b) If there is no value on the label (43), or there is no label


attached to the flap arm:
- align the top surface of the flap trailing edge with the zero
mark on the scale block (68).

R
R
R
R

(4) Adjust the main eccentric bearing until the dimension S (between the
bottom surface of the shroud-box trailing edge and the top surface of
the flap at the WX500 position) is between 4.5 mm (0.1771 in.) and
8.0 mm (0.3149 in.).

(5) At the track 1 position:

R
R

(a) Measure the dimension Q (between the flap drive-arm (4) and the
rotary actuator drive-lever (5)).

R
R
R

(b) If the dimension Q is less than 2 mm (0.0787 in.), you can apply
a force of not more than 25 kg (55.1155 lb) to the fork of the
flap drive-arm (4) to align the holes.



EFF :
ALL
 27-51-00



AIJ




Page 597
May 01/10

Rigging Dimension - Inboard Flap


Figure 519/TASK 27-51-00-991-075



EFF :
ALL
 27-51-00



AIJ




Page 598
Feb 01/11

(c) Loosely install the bolt (6).

R
R
R
R
R

(d) If the dimension Q is more than 2 mm (0.0787 in.), adjust the


forward eccentric (in the flap drive-arm) until the dimension Q
is not more than 2 mm (0.0787 in.). To do this:
(Ref. Fig. 520/TASK 27-51-00-991-076)

1
_

Remove and discard the cotter pin (92).

R
R

2
_

Remove the nut (95), the washer (94) and the serrated
lockwasher (96).

R
R

3
_

Loosen the nut (91) sufficiently to let the eccentric bolt


(97) move.

R
R

4
_

Turn the eccentric bolt (97) until the dimension Q is not more
than 2 mm (0.0787 in.) and loosely install the bolt (6).

R
R

(6) Remove the TOOL-RESTRAINING,TK1 from the flap track 1 beam (Ref. Para
4.K.(2)) attached to the flap arm:

R
R

(7) Do a check of the flap rigged position again to make sure that it is
in the specified limits. If the flap rigged position is not correct:

R
R

(a) Install the TOOL-RESTRAINING,TK1 (98D27504039000) on the flap


track 1 beam (Ref. Para 4.F.(2)).

(b) Disconnect the track 1 flap drive levers (4) and (5).

R
R

(c) Put the track 1 main eccentric bearing back to its zero datum
position.

R
R

(d) Do steps (2) thru (6) again until the flap is in the correct
rigged position.

(e) Tighten the nut (91) and install a new cotter pin (92).

R
R

(f) Install the serrated lockwasher (96) with the end of the bolt
(93) through its hole.

R
R

(8) Apply a layer of the zinc chromate putty SPECIAL MATERIALS (Material
No. 05-002) to the threads of the bolt (93).

(9) Install the washer (94) and the nut (95).



EFF :
ALL
 27-51-00



AIJ




Page 599
May 01/10

Forward Eccentric Bearing - Track 1


Figure 520/TASK 27-51-00-991-076



EFF :
ALL
 27-51-00



AIJ




Page A500
Feb 01/11

R
R
R

(10) Apply a layer of the STORAGE PRESERVATION (Material No. 15-007) to:
- the cotter pin (92), the nuts (91) and (95), the washer (94) and
the eccentric bolt (97).
Subtask 27-51-00-420-075
K. Remove the Adjusting Tools from the Main Eccentric Bearings of the
Inboard Flap

(Ref. Fig. 515/TASK 27-51-00-991-071, 518/TASK 27-51-00-991-074)


(1) At the track 1 position:
(a) Remove the TOOL-FLAP ADJUSTING from the eccentric bush (86).
(b) Install the toothplate (85), the lockwasher (84) and the nut
(83).
(c) TORQUE the nut (83) with the ADAPTER-TORQUE-TRUNNION NUT
(98D27504035000) to between 5.4 and 7.0 m.daN (39.82 and 51.62
lbf.ft).
(d) Lock the nut (83) with the lockwasher (84).
WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE
_______
WORK AREA WHEN YOU USE SPECIAL MATERIALS.
IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR
MOUTH OR IN YOUR EYES :
-FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN
10 AND 15 MINUTES.
-GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
DO NOT BREATHE THE FUMES FROM THE MATERIAL.
DO NOT SMOKE WHEN YOU USE THE MATERIAL.
DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES
OF HEAT.
THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS,
FLAMMABLE AND SKIN IRRITANTS.
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE
_______
THIS/THESE MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
(e) Apply a layer of BONDING AND ADHESIVE COMPOUNDS (Material No. 08004A) to the stop (82).
(f) Install the stop (82), the tabwasher (81) and the bolt (80).



EFF :
ALL
 27-51-00



AIJ




Page A501
May 01/10

(g) TORQUE the bolt (80) to between 1.0 and 1.5 m.daN (88.49 and
132.74 lbf.in).
(h) Lock the bolt (80) with the tabwasher (81).
(2) At the track 2 position:
(a) On the carriage bolt (58) install these items:
- the locking plate (51) (make sure that the main eccentric
bearing, the splined bush and the locking plate (51) are
correctly engaged)
- a new crushable spacer (52)
- the nut (53).
(b) TORQUE the nut (53) to between 15 and 20 m.daN (110.61 and 147.49
lbf.ft).
(c) Safety the nut (53) with a new cotter pin (54).
(d) Install the washer (56) and the nut (55).
R
R

(e) TORQUE the nuts (57) on the failsafe hooks to 0.12 m.daN (10.61
lbf.in) maximum.
(f) Safety the nuts (57) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-51-00-820-068-A
L. Completion of the Flap Rigging Procedure
(Ref. Fig. 513/TASK 27-51-00-991-068, 517/TASK 27-51-00-991-073)
(1) At the track 1 position, complete the installation of the flap drive
levers (4) and (5) (Ref. TASK 27-54-61-400-001).
(2) At the track 1 position, remove the TOOL-RESTRAINING, TK1 from the
flap track 1 beam as follows:
(a) Remove the spigot (62) from the body assembly (64).
(b) Disconnect the stop (66) from the track beam (62).
(c) Remove the body assembly (64) from the flap track beam (62).



EFF :
ALL
 27-51-00



AIJ




Page A502
Nov 01/10

(3) At the track 2 position, remove the KIT-FLAP RIGGING from the flap
track beam as follows:
(a) Remove the scale block (68) RIG-SCALE,FLAP (98D27508655000) from
the fin (69).
(b) Remove the pin (70) and remove the fin (69) from the base
assembly (71).
(c) Loosen the knurled screws (75) and remove the base assembly (71)
from the flap track beam (76).
(4) Remove all the rigging pins (1) and (7).
(5) Install the adaptor drive on the gearbox.
(6) Use the pneumatic wrench to turn the adaptor drive and fully extend
and retract the flaps. Make sure that the flaps operate correctly.
(7) Install the rigging pin (1) at the track 1 position.
Subtask 27-51-00-820-069
M. Alignment of the Inboard and Outboard Flap Cruise Rollers
R
R

(1) Make sure that the alignment of all the cruise rollers and the outer
roller is correct (Ref. TASK 27-51-00-820-010).
Subtask 27-51-00-420-076
N. Completion of the Flap Connection
(1) Connect the interconnecting strut to the outboard flap (Ref. TASK 2754-62-400-001).
(2) Install the flap kink seals (Ref. TASK 27-54-61-400-006).
Subtask 27-51-00-710-070
P. Operational Test of the Flap System
(1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).



EFF :
ALL
 27-51-00



AIJ




Page A503
Aug 01/11

5. Close-up
________
Subtask 27-51-00-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels:
(a) For the LH wing, install:
- 573AB, 573CB (Ref. TASK 57-51-37-400-002)
- 575AB (Ref. TASK 57-51-37-400-004)
(b) For the RH wing, install:
- 673AB, 673CB (Ref. TASK 57-51-37-400-002)
- 675AB (Ref. TASK 57-51-37-400-004)
Subtask 27-51-00-942-079
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-00


R 
AIJ




Page A504
Aug 01/11

TASK 27-51-00-820-010

Adjustment of the Flap Rollers

1. __________________
Reason for the Job

R
R
R

This procedure is applicable during the flap rigging procedure (adjustment


of the flap rigged position).
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R

No specific
No specific
No specific
No specific
No specific
98D27504006000
98D27803500001

1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 PIN-RIGGING, FLAPS
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R

11
18

cotter pin
cotter pin

57-51-33 01 -010
57-51-33 01 -010



EFF :
ALL
 27-51-00



AIJ




Page A505
Aug 01/11

C. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R

27-50-00-866-011
27-50-00-866-012
27-51-00-820-008

3. __________
Job Set-up

Subtask 27-51-00-860-077

27-54-61-000-002
27-54-61-400-006
27-51-00-991-046
27-51-00-991-049

Manual Extension of the Flaps


Manual Retraction of the Flaps
Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Fig. 521
Fig. 522

A. Aircraft Maintenance Configuration

R
R
R

(1) Make sure that the aircraft is in the correct maintenance


configuration as given in the applicable rigging procedure
(Ref. TASK 27-51-00-820-008).

(2) Safety Precautions

R
R

(a) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever.

R
R

(b) Make sure that the WARNING NOTICE(S) is in position to tell


persons not to operate the flap/slat control lever.

(c) Make sure that the SAFETY BARRIER(S) are in position.

Subtask 27-51-00-865-108

R
R
R
R
R
R
R

B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-00



AIJ




Page A506
Aug 01/11

4. Procedure
_________

Subtask 27-51-00-820-085

R
R

A. Adjustment of the Cruise Rollers of the Inboard and Outboard Flap


(Ref. Fig. 521/TASK 27-51-00-991-046)

(1) Adjustment of the cruise roller of the outboard flap:

R
R

(a) Measure dimension Y (between the cruise roller and the cam
plate):

R
R

1
_

The position of the cruise roller (6) is correct if dimension


Y is between 0 mm (0.0000 in.) and 2 mm (0.0787 in.).

R
R

2
_

If dimension Y is more than 2 mm (0.0787 in.), you must adjust


the position of the cruise roller (6).

(b) Adjustment of the cruise roller (6):

R
R

1
_

If necessary, remove the cushion seal (2) (Ref. TASK 27-54-61000-002).

2
_

Remove the nut (4), the collar (3) and the serrated plate (5).

3
_

Turn the eccentric bushing (1) until dimension Y is correct.

R
R

4
_

Install the serrated plate (5) to lock the eccentric bushing


(1).

5
_

Install the collar (3) and the nut (4).

R
R

6
_

TORQUE the nut (4) to between 4.8 and 5.4 m.daN (35.39 and
39.82 lbf.ft).

(c) Do a check of dimension Y again.

R
R

1
_

If necessary, install the cushion seal (2) again (Ref. TASK


27-54-61-400-006).

(2) Adjustment of the outboard cruise roller of the inboard flap

(a) Measure and record dimension V.

R
R

(b) Measure dimension X, this must be 6 mm (0.2362 in.) minus


dimension V, +/- 0.5 mm (0.0196 in.).



EFF :
ALL
 27-51-00



AIJ




Page A507
Aug 01/11

R
R

Adjustment of the Cruise Rollers


Figure 521/TASK 27-51-00-991-046



EFF :
ALL
 27-51-00



AIJ




Page A508
Aug 01/11

R
R

(c) If dimension X is not correct, you must adjust the cruise roller
(6).

(d) Adjustment of the cruise roller (6):

R
R

1
_

If necessary, remove the cushion seal (2) (Ref. TASK 27-54-61000-002).

2
_

Remove the nut (4), the collar (3) and the serrated plate (5).

3
_

Turn the eccentric bushing (1) until dimension X is correct.

R
R

4
_

Install the serrated plate (5) to lock the eccentric bushing


(1).

5
_

Install the collar (3) and the nut (4).

R
R

6
_

TORQUE the nut (4) to between 4.8 and 5.4 m.daN (35.39 and
39.82 lbf.ft).

(e) Do a check of dimension X again.

R
R
R

1
_

If necessary, install the cushion seal (2) again (Ref. TASK


27-54-61-400-006).

Subtask 27-51-00-820-087

R
R

B. Adjustment of the Outer Roller (at the Outer Fixed Shroud)


(Ref. Fig. 522/TASK 27-51-00-991-049)

R
R

(1) Use a straight-edge to measure the alignment between the outboard


flap top surface and the outer fixed-shroud top surface.

R
R

(a) If the dimension is less than 1 mm (0.0393 in.), the position of


the outer roller (14) is correct.

R
R

(b) If the dimension is more than 1 mm (0.0393 in.), you must adjust
the outer roller (14).

(2) Adjustment of the outer roller (14):

R
R

(a) Remove all rigging pins and manually extend the flaps to the
fully extended position (Ref. TASK 27-50-00-866-011).

(b) Install the PIN-RIGGING, FLAPS at the track 4 position.

(c) Remove and discard the cotter pins (11) and (18).



EFF :
ALL
 27-51-00



AIJ




Page A509
Aug 01/11

R
R

Adjustment of the Outer Roller (at the Outer Fixed Shroud)


Figure 522/TASK 27-51-00-991-049



EFF :
ALL
 27-51-00



AIJ




Page A510
Aug 01/11

(d) Remove the nut (11) and the washer (12).

R
R

(e) Remove the bolt (13) and release the locking plate (16) from the
spigot (15).

(f) Loosen the nut (17) sufficiently to let you turn the spigot (15).

R
R

(g) Turn the spigot (15) until the roller (14) moves the flap within
the specified limits.

(h) Install the locking plate (16).

(i) Install the washer (12) and the nut (10).

R
R

(j) TORQUE the nut (10) to between 0.5 and 0.6 m.daN (44.24 and 53.09
lbf.in).

R
R

(k) TORQUE the nut (17) to between 1.3 and 1.4 m.daN (115.04 and
123.89 lbf.in).

(l) Make sure that the roller (14) is free to turn.

(m) Remove the PIN-RIGGING, FLAPS from the track 4 position.

R
R

(n) Manually retract the flaps to the position 0. (Ref. TASK 27-5000-866-012)

(o) Install the PIN-RIGGING, FLAPS at the track 4 position again.

(3) Do a check of the dimension again:

R
R

(a) Use a straight-edge to measure the alignment between the outboard


flap top surface and the outer fixed-shroud top surface.

R
R

(b) If the dimension is less than 1 MM (0.0393 IN.), the position of


the outer roller (14) is correct.

R
R

(c) If the dimension is more than 1 MM (0.0393 IN.), do the


adjustment of the roller (14) again.

(4) When the dimension is correct:

(a) Install a new cotter pin (11) and cotter pin (18).

(b) Remove all the rigging pins.



EFF :
ALL
 27-51-00



AIJ




Page A511
Aug 01/11

5. Close-up
________

Subtask 27-51-00-860-078

A. Aircraft Maintenance Configuration

R
R
R

(1) After the adjustment:


- Continue the applicable rigging procedure (Ref. TASK 27-51-00-820008).



EFF :
ALL
 27-51-00



AIJ




Page A512
Aug 01/11

Installation of the Flap Rigging Pin at Track 1


Figure 523/TASK 27-51-00-991-017


EFF :
ALL
 27-51-00


R 
AIJ




Page A513
Aug 01/11

Installation of the Flap Rigging Pins


Figure 524/TASK 27-51-00-991-055


EFF :
ALL
 27-51-00


R 
AIJ




Page A514
Aug 01/11

Installation of the Flap Rigging Kit


Figure 525/TASK 27-51-00-991-018


EFF :
ALL
 27-51-00



AIJ




Page A515
Aug 01/11

Inboard Flap Rigging Dimensions


Figure 526/TASK 27-51-00-991-019


EFF :
ALL
 27-51-00



AIJ




Page A516
Aug 01/11

Outboard Flap Rigging Dimensions (Sheet 1)


Figure 527/TASK 27-51-00-991-022


EFF :
ALL
 27-51-00



AIJ




Page A517
Aug 01/11

Alignment of the Outer Roller of the Outboard Flap


Figure 528/TASK 27-51-00-991-078



EFF :
ALL
 27-51-00



AIJ




Page A518
Aug 01/11

______________________________________________________________
SENSOR
FLAP ATTACHMENT FAILURE DETECTION (37CV,38CV,39CV,40CV)
____________________
REMOVAL/INSTALLATION
R

TASK 27-51-15-000-002
Removal of the Proximity-Sensors of the Interconnecting Strut
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To give ATA reference to agree with CFDS message.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-44-000-002

Removal of the Proximity-Sensor of the


Interconnecting Strut



EFF :
ALL
 27-51-15



AIJ




Page 401
Feb 01/07

3. __________
Job Set-up
Subtask 27-51-15-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
4. Procedure
_________
Subtask 27-51-15-020-050
A. Remove the Proximity Sensor
(1) Remove the applicable proximity sensor (Ref. TASK 27-51-44-000-002).



EFF :
ALL
 27-51-15


R 
AIJ




Page 402
Feb 01/07

TASK 27-51-15-400-002
Installation of the Proximity-Sensors of the Interconnecting Strut
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To give ATA reference to agree with CFDS message.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-44-400-002

Installation of the Proximity-Sensor of the


Interconnecting Strut

3. __________
Job Set-up
Subtask 27-51-15-941-051
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.



EFF :
ALL
 27-51-15



AIJ




Page 403
Feb 01/07

4. Procedure
_________
Subtask 27-51-15-420-050
A. Install the Proximity Sensor
(1) Install the applicable proximity sensor (Ref. TASK 27-51-44-400-002).
5. Close-up
________
Subtask 27-51-15-942-050
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-15


R 
AIJ




Page 404
Feb 01/07

COMMAND SENSOR UNIT (CSU) (51CV) - REMOVAL/INSTALLATION


_______________________________________________________
TASK 27-51-17-000-001
Removal of the Command Sensor Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

blanking caps
circuit breaker(s) safety clip(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
R

**ON A/C 001-010, 013-100,


27-51-17-991-001

Retraction of the Flaps on the Ground

Fig. 401

**ON A/C 011-012,


27-51-17-991-001-A

Fig. 401A



EFF :
ALL
 27-51-17



AIJ




Page 401
Aug 01/11

**ON A/C ALL


3. __________
Job Set-up
Subtask 27-51-17-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
Subtask 27-51-17-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
R

**ON A/C 001-010, 013-100,


(Ref. Fig. 401/TASK 27-51-17-991-001)

**ON A/C 011-012,


(Ref. Fig. 401A/TASK 27-51-17-991-001-A)



EFF :
ALL
 27-51-17



AIJ




Page 402
Aug 01/11

Command Sensor Unit (CSU)


Figure 401/TASK 27-51-17-991-001


R
EFF :
001-010, 013-100,
 27-51-17



AIJ




Page 403
Aug 01/11

Command Sensor Unit (CSU)


Figure 401A/TASK 27-51-17-991-001-A


R
EFF :
011-012,
 27-51-17



AIJ




Page 404
Aug 01/11

**ON A/C ALL


Subtask 27-51-17-020-050
A. RemovaL of the CSU
(1) Remove the screws (1) and the washers (2).
(2) Lift the control lever (9).
(3) Disconnect the electrical connectors (7) and (6) from the CSU (5).
(4) Disconnect the electrical connector (8) from the control lever (9).
(5) Put blanking caps on the disconnected electrical connector(s).
(6) Cut and discard the lockwire from the screws (3).
(7) Remove the four screws (3) and the washers (4).
(8) Remove the CSU



EFF :
ALL
 27-51-17



AIJ




Page 405
May 01/11

TASK 27-51-17-400-001
Installation of the Command Sensor Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

corrosion-resistant steel lockwire 0.5 mm (0.020


in.) dia.

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-54-00-710-002
31-21-00-750-002
R

**ON A/C 001-010, 013-100,


27-51-17-991-001

Retraction of the Flaps on the Ground


Operational Test of the Flap and Slat Systems
Procedure to set the Clock

Fig. 401

**ON A/C 011-012,


27-51-17-991-001-A

Fig. 401A



EFF :
ALL
 27-51-17



AIJ




Page 406
Aug 01/11

**ON A/C ALL


3. __________
Job Set-up
Subtask 27-51-17-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
Subtask 27-51-17-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
R

**ON A/C 001-010, 013-100,


(Ref. Fig. 401/TASK 27-51-17-991-001)

**ON A/C 011-012,


(Ref. Fig. 401A/TASK 27-51-17-991-001-A)



EFF :
ALL
 27-51-17



AIJ




Page 407
Aug 01/11

**ON A/C ALL


Subtask 27-51-17-420-050
A. Installation of the CSU
(1) Install the control lever (9) on the Command Sensor Unit (CSU) (5).
NOTE : Make sure that the mark on the gear of the CSU (5) aligns with
____
the fixed mark. Correctly engage the gear in the control lever
(9).
(2) Install the washers (4), the screws (3) and tighten.
(3) Safety the screws (3) with corrosion-resistant steel lockwire 0.5 mm
(0.020 in.) dia..
(4) Remove the blanking caps from the electrical connector(s).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connectors (7) and (6) to the CSU (5).
(7) Connect the electrical connector (8) to the control lever (9).
(8) Install the control lever (9) on its support.
(9) Install the washers (2), the screws (1) and tighten.
Subtask 27-51-17-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 6CV, 7CV, 8CV, 5PB1, 12PB1, 5PB2, 12PB2, 4LF, 1CN, 2CN
Subtask 27-51-17-710-051
C. Do the operational test of the flap and slat system (Ref. TASK 27-54-00710-002)
(1) If necessary, adjust the clock (Ref. TASK 31-21-00-750-002).



EFF :
ALL
 27-51-17



AIJ




Page 408
May 01/11

5. Close-up
________
Subtask 27-51-17-860-052
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-51-17



AIJ




Page 409
May 01/11

COMMAND SENSOR UNIT (CSU) (51CV) - INSPECTION/CHECK


___________________________________________________
TASK 27-51-17-280-001
Removal and Workshop Check of the Friction Brake of the Flap/Slat Command
Sensor Unit (CSU)
1. __________________
Reason for the Job
Refer to the MPD TASK: 275117-01
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-17-000-001
27-51-17-400-001
CMM 270902

Removal of the Command Sensor Unit (CSU) (51CV)


Installation of the Command Sensor Unit (CSU) (51CV)

3. __________
Job Set-up
Subtask 27-51-17-020-051
A. Removal of the CSU
(1) Remove the CSU (Ref. TASK 27-51-17-000-001).
4. Procedure
_________
Subtask 27-51-17-280-050
A. Check of the CSU
R

(1) In the workshop, do the test of the friction brake (Ref. CMM 270902).
5. Close-up
________
Subtask 27-51-17-420-051
A. Installation of the CSU
(1) Install the CSU (Ref. TASK 27-51-17-400-001).



EFF :
ALL
 27-51-17



AIJ




Page 601
May 01/09

POSITION PICK OFF UNIT - ASYMMETRY (APPU) (29CV,30CV) - REMOVAL/INSTALLATION


____________________________________________________________________________
R

TASK 27-51-18-000-001
Removal of the Asymmetry-Position Pick-Off Unit 29CV (30CV)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
98D27504005000
98D27803500001

blanking caps
circuit breaker(s) safety clip(s)
safety barriers
tie-wrap
warning notice
access platform 4 m (13 ft. 1 in.)
1 PIN RIGGING-FLAPS (TRACK 1)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-51-18



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R

27-50-00-866-009
27-51-18-991-001
27-51-18-991-002
FOR FIN 29CV
57-51-37-000-004
FOR FIN 30CV
57-51-37-000-004

Retraction of the Flaps on the Ground


Fig. 401
Fig. 402
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-51-18-991-001)


Subtask 27-51-18-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-51-18-860-050
B. Aircraft Maintenance Configuration
(1) If you replace the APPU, fully retract the flaps (Ref. TASK 27-50-00866-009).
NOTE : An APPU is self locking and can be removed/installed when the
____
flap/slat system is not at zero if:
- the same APPU is to be installed and its position is not
changed
- no movement of the flap/slat system is permitted during the
time the APPU is removed.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control-lever.



EFF :
ALL
 27-51-18



AIJ




Page 402
Feb 01/07

R
R

Flap APPU - Detail and Location


Figure 401/TASK 27-51-18-991-001



EFF :
ALL
 27-51-18



AIJ




Page 403
Feb 01/07

(3) If a new APPU is to be installed, install the PIN RIGGING-FLAPS


(TRACK 1) (98D27504005000) at the flap track 1 position only.
(4) Remove the safety collar from the circuit breakers 10CV and 12CV.
Subtask 27-51-18-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-18-010-050
D. Get Access
(1) Put the access platform in position:
- FOR 29CV
below the access panel 575FB
- FOR 30CV
below the access panel 675FB.
(2) Remove the applicable access panel:
- FOR 29CV
remove 575FB (Ref. TASK 57-51-37-000-004)
- FOR 30CV
remove 675FB (Ref. TASK 57-51-37-000-004).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-51-18-991-001, 402/TASK 27-51-18-991-002)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-51-18



AIJ




Page 404
Feb 01/07

Flap APPU - Zero Datum Settings and Locations


Figure 402/TASK 27-51-18-991-002



EFF :
ALL
 27-51-18



AIJ




Page 405
Nov 01/10

Subtask 27-51-18-020-050
A. Removal of the Asymmetry-Position Pick-Off Unit
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
(1) Electrically disconnect the APPU.
(a) Disconnect the plug (4) from the connector A and the plug (5)
from the connector B.
(b) Install blanking caps on the plugs (4) and (5) and the connectors
A and B.
(2) Hold the APPU (3), remove the bolts (2) and the washers (1), then
disengage and remove the APPU (3).
(3) Install a tie-wrap (6) behind the locking plate (7) to lock the APPU
(3) in position.



EFF :
ALL
 27-51-18


R 
AIJ




Page 406
Feb 01/07

TASK 27-51-18-400-001
Installation of the Asymmetry-Position Pick-Off Unit 29CV (30CV)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-51-18



AIJ




Page 407
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-54-00-710-001
27-51-18-991-001
27-51-18-991-002
FOR FIN 29CV
57-51-37-000-004
57-51-37-400-004
FOR FIN 30CV
57-51-37-000-004
57-51-37-400-004

Retraction of the Flaps on the Ground


Operational Test of the Flap System
Fig. 401
Fig. 402
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-51-18-991-001, 402/TASK 27-51-18-991-002)
Subtask 27-51-18-941-057
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-51-18-860-052
B. Aircraft Maintenance Configuration
(1) If you install a new APPU (3):
(a) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00866-009).



EFF :
ALL
 27-51-18


R 
AIJ




Page 408
Aug 01/11

(b) Make sure that the PIN RIGGING-FLAPS (TRACK 1) is installed at


the track 1 position only.
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control-lever quadrant.
(3) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in
position:
(a) FOR 29CV
below access panel 575FB
(b) FOR 30CV
below access panel 675FB.
(4) Make sure that the applicable access panel has been removed:
(a) FOR 29CV
remove 575FB (Ref. TASK 57-51-37-000-004)
(b) FOR 30CV
remove 675FB (Ref. TASK 57-51-37-000-004).
Subtask 27-51-18-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-18-991-001, 402/TASK 27-51-18-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-51-18


R 
AIJ




Page 409
Aug 01/11

Subtask 27-51-18-420-053
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R

(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Clean the interface of the APPU (3), the APPU adaptor assembly (11),
the bolts (2) and the washers (1) with CLEANING AGENTS (Material No.
11-026).
(3) Examine the APPU (3) and the interface of the APPU adaptor assembly
(11) for damage, cracks and corrosion.
(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(5) Do an inspection of the component interface and/or the adjacent area.
(6) On a new APPU (3) make sure that:
- the gear zero marks and the orange zero indicator aligns with their
applicable fixed pointers
- the marks on the drive shaft align with each other.
Subtask 27-51-18-420-052
B. Installation of the Asymmetry-Position Pick-Off Unit
CAUTION : MAKE SURE THAT THE FLAP SYSTEM IS IN THE ZERO POSITION BEFORE
_______
YOU INSTALL A NEW APPU. A NEW APPU IS SUPPLIED LOCKED IN THE
ELECTRICAL AND MECHANICAL ZERO POSITION.
(1) Make sure the gearbox quill shaft (10) is concentric within the
spigot bore of the gearbox (9).
(2) Remove the tie-wrap (6) from behind the locking plate (7).



EFF :
ALL
 27-51-18



AIJ




Page 410
Aug 01/11

(3) Put the APPU (3) in position on the gearbox (9). Make sure the shroud
slot and the key are correctly aligned.
(4) Engage the APPU drive shaft (8) with the gearbox quill shaft (10).
CAUTION : DO NOT USE THE INSTALLATION BOLTS TO FULLY ENGAGE THE APPU
_______
DRIVE IN THE SPIGOT INNER SURFACE.
THIS WILL CAUSE:
- DAMAGE TO THE APPU
- DAMAGE TO THE SPLINES
- THE RETAINING PIN TO BREAK.
(a) Use hand pressure and push the APPU (3) fully in position in the
gearbox (9).
NOTE : This force must only be sufficient to allow installation
____
of the washers (1) and the bolts (2). The force required
will be approximately 3.5 daN (7.90 lbf).
(b) Hold the APPU (3) in this position and install the washers (1)
and the bolts (2).
(5) TORQUE the bolts (2) to between 0.78 and 0.96 m.daN (69.02 and 84.95
lbf.in).
(6) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolts (2) and the washers (1)
- the joint between the APPU (3) and the gearbox (9).
(7) Remove the blanking caps from the plugs (4) and (5) and the
connectors A and B.
(8) To electrically connect the APPU:
CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(a) Connect the plug (4) to the connector A and the plug (5) to the
connector B.



EFF :
ALL
 27-51-18


R 
AIJ




Page 411
Aug 01/11

Subtask 27-51-18-860-051
C. Aircraft Configuration
(1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control-lever quadrant.
(2) If a new APPU was installed, remove the PIN RIGGING-FLAPS (TRACK 1)
from the track 1 position.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-51-18-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.
Subtask 27-51-18-710-050
E. Test
(1) Install the safety collar on the circuit breakers 10CV and 12CV.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-51-18-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
(a) FOR 29CV
install 575FB (Ref. TASK 57-51-37-400-004)
(b) FOR 30CV
install 675FB (Ref. TASK 57-51-37-400-004).



EFF :
ALL
 27-51-18


R 
AIJ




Page 412
Aug 01/11

Subtask 27-51-18-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-18


R 
AIJ




Page 413
Aug 01/11

POSITION PICK - OFF UNIT - FEED BACK (FPPU) (27CV) - REMOVAL/INSTALLATION


_________________________________________________________________________
TASK 27-51-19-000-001
Removal of the Feed Back Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504005000

blanking caps
circuit breaker(s) safety clip(s)
tie-wrap
1 ACCESS PLATFORM 3M (10 FT)
1 PIN RIGGING-FLAPS (TRACK 1)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
32-12-00-010-001
27-51-19-991-001

Retraction of the Flaps on the Ground


Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-51-19-010-050
A. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-51-19



AIJ




Page 401
Feb 01/11

Subtask 27-51-19-860-050
B. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT) in position at the opening of the
main door of the main gear.
(2) Make sure that the flaps are in the fully retracted position
(Ref. TASK 27-50-00-866-009).
(3) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) at the flap
track 1 position only.
Subtask 27-51-19-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-19-991-001)
Subtask 27-51-19-020-050
A. Removal of the Feed Back Position Pick-Off Unit
NOTE : Do not remove the Feed Back Position Pick-off Unit when the
____
Pressure-off Brakes are removed from the Power Control Unit.
(1) Remove the electrical connectors 27CV-A and 27CV-B from the Feed Back
Position Pick-off Unit (FPPU).
(2) Put blanking caps on the disconnected electrical connector(s).
(3) Remove the screws (1) and the washers (2).
(4) Remove the FPPU carefully from the gearbox.
(5) Put a tie-wrap (3) behind the locking plate to prevent the retraction
of the locking plate.



EFF :
ALL
 27-51-19



AIJ




Page 402
Feb 01/11

R
R

Feedback Position Pick-Off Unit


Figure 401/TASK 27-51-19-991-001



EFF :
ALL
 27-51-19



AIJ




Page 403
Feb 01/07

TASK 27-51-19-400-001
Installation of the Feed Back Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)


Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


ZINC POWDER (Ref. 20-31-00)



EFF :
ALL
 27-51-19



AIJ




Page 404
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-009
27-54-00-710-001
27-54-00-820-001
31-32-00-860-006
32-12-00-010-001
32-12-00-410-001
27-51-19-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Adjustment of the Flap Drive System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401

3. __________
Job Set-up
Subtask 27-51-19-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
R

(2) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the
opening of the main door of the main gear.
(3) Make sure that the flaps are in the retracted position (Ref. TASK 2750-00-866-009) because a new FPPU is delivered locked in its zero
position.
Subtask 27-51-19-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-19



AIJ




Page 405
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-51-19-991-001)


Subtask 27-51-19-860-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Remove the sealing compound from the flange of the replacement FPPU.
(4) Clean the anodic contact areas on the FPPU and the gearbox.
(5) Coat the areas with a mixture of SPECIAL MATERIALS (Material No. 05002) and SPECIAL MATERIALS (Material No. 05-054) in the ratio of 58
to 42 by weight.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
screws (1).
Subtask 27-51-19-420-050
B. Installation of the Feed Back Position Pick-Off Unit (9)
(1) Make sure that all zero marks on the FPPU are aligned.
(2) Remove the tie-wrap (3).
(3) Install the FPPU carefully on the gearbox.
(4) Install the screws (1) and the washers (2).
(5) TORQUE the screws (1) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).



EFF :
ALL
 27-51-19



AIJ




Page 406
Feb 01/07

(6) Do a bonding test between the main bonding point of the power control
unit and the FPPU flange. The resistance must not be more than 20
milliohms.
(7) Remove the blanking caps from the electrical connectors.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(9) Connect the electrical connectors 27CV-A and 27CV-B to the FPPU.
(10) Remove the PIN RIGGING-FLAPS (TRACK 1) from the track 1 position.
Subtask 27-51-19-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-19-740-050
D. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display-System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display-Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position ZERO on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- Push (in) the line key < SFCC 1. - The MCDU shows the SFCC 1 menu.
2. Push (in) the NEXT PAGE button.

- The MCDU shows the next page of the


SFCC 1 menu.

3. Push (in) the line key SYSTEM DATA - The MCDU shows the SFCC 1 FLAP
FLP >.
SYSTEM DATA menu.
4. Push (in) the line key < PPU.

- The MCDU shows the PPU DATA page(s):



EFF :
ALL
 27-51-19



AIJ




Page 407
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------Refer to Table 1.
NOTE : The APPU and the FPPU synchro
____
angles must not be different by
more than 1.3 deg.
The LH APPU and the RH APPU
synchro angles must not be
different by more than 0.45 deg.
5. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
6. De-energize the aircraft
electrical circuits (Ref. TASK 2441-00-862-002).
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position ZERO
|
|
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-51-19


R 
AIJ




Page 408
Feb 01/11

Subtask 27-51-19-820-050

E. Adjustment

R
R
R
R
R

NOTE : The difference between the LH APPU and the FPPU must be in the
____
limit plus or minus 1.3 deg maximum). The difference between the
RH APPU and the FPPU must be in the limits (plus or minus 1.3 deg
maximum). The difference between the LH APPU and the RH APPU is in
the limits (plus or minus 0.45 deg maximum).

R
R

(1) If necessary, do an adjustment of the flap drive system (Ref. TASK


27-54-00-820-001).
Subtask 27-51-19-710-050

F. Do the operational test of the flap system (Ref. TASK 27-54-00-710-001).


5. Close-up
________
Subtask 27-51-19-410-050
A. Close Access
(1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-51-19



AIJ




Page 409
Aug 01/09

COMPUTER - SLAT AND FLAP CONTROL (SFCC) (21CV,22CV) - REMOVAL/INSTALLATION


__________________________________________________________________________
TASK 27-51-34-000-001
Removal of the SFCC (21CV,22CV)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific

blanking caps
circuit breaker(s) safety clip(s)
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-34-991-001

Fig. 401

3. __________
Job Set-up
Subtask 27-51-34-865-050
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 21CV
49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
FOR 22CV
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02



EFF :
ALL
 27-51-34



AIJ




Page 401
Feb 01/11

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-51-34-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.


(2) Open the access door 824.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-34-991-001)
Subtask 27-51-34-020-050
A. Removal of the SFCC
(1) Loosen the knurled nuts (4).
(2) Pull the SFCC (1) on its rack (3) to disconnect it from the
electrical connectors (2).
(3) Remove the SFCC (1) from its rack (3).
(4) Put blanking caps on the disconnected electrical connectors (2).



EFF :
ALL
 27-51-34



AIJ




Page 402
Feb 01/11

R
R

Slat and Flap Control Computer (SFCC)


Figure 401/TASK 27-51-34-991-001



EFF :
ALL
 27-51-34



AIJ




Page 403
Feb 01/07

TASK 27-51-34-400-001
Installation of the SFCC (21CV,22CV)
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------22-97-00-710-001
27-51-00-740-002
27-54-00-710-002
27-81-00-740-002
R

31-21-00-750-002
44-34-00-040-002
27-51-34-991-001

Operational Test of the LAND CAT III Capability


Bite Test of the Slat and Flap Control Computers
(Flap System)
Operational Test of the Flap and Slat Systems
Bite Test of the Slat and Flap Control Computers
(Slat System)
Procedure to set the Clock
Deactivation of the On-board Mobile Telephony System
Fig. 401

3. __________
Job Set-up
Subtask 27-51-34-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in
position.
(2) Make sure that the access door 824 is open.



EFF :
ALL
 27-51-34



AIJ




Page 404
Aug 01/11

Subtask 27-51-34-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------FOR 21CV
49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
FOR 22CV
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-34-991-001)
R

**ON A/C 013-100,

Subtask 27-51-34-860-051

A. Electromagnetic Interference (EMI)

R
R
R
R
R

CAUTION : THERE IS AN ONBOARD MOBILE-TELEPHONY SYSTEM (OMTS) INSTALLED ON


_______
THIS AIRCRAFT.
THE OPERATION OF MOBILE PHONES CAN CAUSE ELECTROMAGNETIC
INTERFERENCE WITH OTHER AIRCRAFT SYSTEMS IF THE EQUIPMENT
INSTALLED DOES NOT HAVE AN APPROVED EMI ASSESSMENT.

R
R
R
R
R
R
R
R

(1) Make sure that electromagnetic interference will not have an effect
on the operation of the equipment that you install. If the part
number of the equipment that you will install:
- is the same as the part number you removed, continue with the
installation procedure.
- is not the same as the part number you removed, deactivate the
OMTS.
(Ref. TASK 44-34-00-040-002).



EFF :
ALL
 27-51-34



AIJ




Page 405
Aug 01/11

**ON A/C ALL


Subtask 27-51-34-420-050

B. Installation of the SFCC


(1) Remove the blanking caps from the electrical connectors (2).
(2) Install the SFCC (1) on its rack (3).
(3) Push the SFCC (1) on its rack (3) to connect it to the electrical
connectors (2).
(4) Attach the SFCC (1) to its rack (3) with the knurled nuts (4).
Subtask 27-51-34-865-052

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
FOR 21CV
5CV, 6CV, 5PB1, 12PB1, 1CN
FOR 22CV
7CV, 8CV, 5PB2, 12PB2, 2CN
Subtask 27-51-34-710-050

D. Test
(1) If you install a new SFCC:
- After the automatic BITE test, do the operational test of the Flap
and Slat Systems (Ref. TASK 27-54-00-710-002).
(2) If you interchange or re-rack the SFCC:
- Do the BITE test of the SFCC (21CV, 22CV) (Flap System) (Ref. TASK
27-51-00-740-002).
- Do the BITE test of the SFCC (21CV, 22CV) (Slat System) (Ref. TASK
27-81-00-740-002).
- Do the operational test of the Flap and Slat Systems (Ref. TASK 2754-00-710-002).
NOTE : If you must replace the two SFCCs at the same time, do the
____
LAND CAT III capability test (Ref. TASK 22-97-00-710-001).
NOTE : If necessary, adjust the clock (Ref. TASK 31-21-00-750-002).
____



EFF :
ALL
 27-51-34



AIJ




Page 406
Aug 01/11

5. Close-up
________
Subtask 27-51-34-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access door 824.
(3) Remove the access platform(s).



EFF :
ALL
 27-51-34



AIJ




Page 407
Aug 01/11

LEVER - FLAP AND SLAT CONTROL - REMOVAL/INSTALLATION


____________________________________________________
TASK 27-51-43-000-001
Removal of the Flap and Slat Control Lever
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

blanking caps
circuit breaker(s) safety clip(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-51-43-000-002
R

**ON A/C 001-010, 013-100,


27-51-43-991-001

Retraction of the Flaps on the Ground


Removal of the Lighted Plate

Fig. 401

**ON A/C 011-012,


27-51-43-991-001-A

Fig. 401A



EFF :
ALL
 27-51-43



AIJ




Page 401
Aug 01/11

**ON A/C ALL


3. __________
Job Set-up
Subtask 27-51-43-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
Subtask 27-51-43-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
R

**ON A/C 001-010, 013-100,


(Ref. Fig. 401/TASK 27-51-43-991-001)

**ON A/C 011-012,


(Ref. Fig. 401A/TASK 27-51-43-991-001-A)



EFF :
ALL
 27-51-43



AIJ




Page 402
Aug 01/11

Flap and Slat Control - Lever


Figure 401/TASK 27-51-43-991-001


R
EFF :
001-010, 013-100,
 27-51-43



AIJ




Page 403
Aug 01/11

Flap and Slat Control - Lever


Figure 401A/TASK 27-51-43-991-001-A


R
EFF :
011-012,
 27-51-43



AIJ




Page 404
Aug 01/11

**ON A/C ALL


Subtask 27-51-43-020-050
A. Removal of the Flap and Slat Control Lever
(1) Remove the lighted plate (Ref. TASK 27-51-43-000-002)
(2) Remove the screws (1) and the washers (2).
(3) Lift the control lever assembly (9).
(4) Disconnect the electrical connector (8) from the control lever
assembly (9).
(5) Disconnect the electrical connector (7) and (6) from the CSU (5).
(6) Put blanking caps on the disconnected electrical connector(s).
(7) Cut and discard the lockwire from the screws (3).
(8) Remove the four screws (3) and the washers (4).
(9) Remove the control lever (9).



EFF :
ALL
 27-51-43



AIJ




Page 405
May 01/11

TASK 27-51-43-400-001
Installation of the Flap and Slat Control Lever
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

corrosion resistant steel lockwire 0.5 mm (0.020


in.) dia.

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-51-43-400-002
27-54-00-710-001
31-21-00-750-002
R

**ON A/C 001-010, 013-100,


27-51-43-991-001

Retraction of the Flaps on the Ground


Installation of the Lighted Plate
Operational Test of the Flap System
Procedure to set the Clock

Fig. 401

**ON A/C 011-012,


27-51-43-991-001-A

Fig. 401A



EFF :
ALL
 27-51-43



AIJ




Page 406
Aug 01/11

**ON A/C ALL


3. __________
Job Set-up
Subtask 27-51-43-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.
Subtask 27-51-43-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
R

**ON A/C 001-010, 013-100,


(Ref. Fig. 401/TASK 27-51-43-991-001)

**ON A/C 011-012,


(Ref. Fig. 401A/TASK 27-51-43-991-001-A)



EFF :
ALL
 27-51-43



AIJ




Page 407
Aug 01/11

**ON A/C ALL


Subtask 27-51-43-420-050
A. Installation of the Flap and Slat Control Lever
(1) Install the control lever (9) on the Command Sensor Unit (CSU) (5).
NOTE : Make sure that the mark on the gear of the CSU (5) aligns with
____
the fixed mark. Correctly engage the gear in the control lever
(9).
(2) Install the washers (4), the screws (3) and tighten.
(3) Safety the screws (3) with corrosion resistant steel lockwire 0.5 mm
(0.020 in.) dia..
(4) Remove the blanking caps from the electrical connector(s).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Connect the electrical connector (8) to the control lever (9).
(7) Connect the electrical connector (7) and (6) to the CSU (5).
(8) Put the control lever assembly (9) on its support.
(9) Install the washers (2), the screws (1) and tighten.
(10) Install the lighted plate (Ref. TASK 27-51-43-400-002)
Subtask 27-51-43-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
1CN, 2CN, 5CV, 6CV, 7CV, 8CV, 5PB1, 12PB1, 5PB2, 12PB2, 4LF
Subtask 27-51-43-710-050
C. Do the operational test of the flap and slat system (Ref. TASK 27-54-00710-001).
NOTE : If necessary, adjust the clock(Ref. TASK 31-21-00-750-002).
____



EFF :
ALL
 27-51-43



AIJ




Page 408
May 01/11

5. Close-up
________
Subtask 27-51-43-860-052
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-51-43


R 
AIJ




Page 409
May 01/11

TASK 27-51-43-000-002
Removal of the Lighted Plate
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-51-43-991-002

Retraction of the Flaps on the Ground


Fig. 402

3. __________
Job Set-up
Subtask 27-51-43-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.



EFF :
ALL
 27-51-43


R 
AIJ




Page 410
May 01/11

Subtask 27-51-43-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
(Ref. Fig. 402/TASK 27-51-43-991-002)
Subtask 27-51-43-020-052
A. Removal of the Lighted Plate
(1) Remove the screw (13) and the handle (12).
(2) Remove the set screw (14) and the pin (16).
(3) Remove the index (15).
(4) Remove the screws (11).
(5) Remove the lighted plate (20).



EFF :
ALL
 27-51-43


R 
AIJ




Page 411
May 01/11

Lighted Plate of the Flaps and Slats Control Lever


Figure 402/TASK 27-51-43-991-002


EFF :
ALL
 27-51-43


R 
AIJ




Page 412
May 01/11

TASK 27-51-43-400-002
Installation of the Lighted Plate
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 08-007

USA MIL-R-46082
TYPE II
THREADLOCKER/SEALANT (Ref. 20-31-00)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-51-43-991-002

Retraction of the Flaps on the Ground


Fig. 402

3. __________
Job Set-up
Subtask 27-51-43-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps and slats are in the fully retracted
position (Ref. TASK 27-50-00-866-009).
(2) Make sure that the hydraulic systems are depressurized.



EFF :
ALL
 27-51-43


R 
AIJ




Page 413
May 01/11

Subtask 27-51-43-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED
4LF
Y04
4. Procedure
_________
Subtask 27-51-43-420-052
A. Installation of the Lighted Plate
(Ref. Fig. 402/TASK 27-51-43-991-002)
(1) Install the lighted plate (20) on the control lever assembly (19).
(2) Install the screws (11) and tighten.
(3) Install the index (15) on the lever (18).
(4) Install the pin (16) through the levers (17) and (18).
(5) Install the set screw (14) with BONDING AND ADHESIVE COMPOUNDS
(Material No. 08-007) into the lever (17) and tighten.
(6) Install the handle (12) on the lever (18).
(7) Install the screw (13) with BONDING AND ADHESIVE COMPOUNDS (Material
No. 08-007) and tighten.



EFF :
ALL
 27-51-43



AIJ




Page 414
May 01/11

Subtask 27-51-43-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 6CV, 7CV, 8CV, 9CV, 10CV, 11CV, 12CV, 4LF, 1CN, 2CN
5. Close-up
________
Subtask 27-51-43-860-055
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-51-43



AIJ




Page 415
May 01/11

STRUT - INTERCONNECTING - REMOVAL/INSTALLATION


______________________________________________
TASK 27-51-44-000-001
Removal of the Interconnecting Strut
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27803000000

blanking caps
circuit breaker(s) safety clip(s)
safety barriers
AR ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
AR WARNING NOTICE(S)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-44



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-866-008
27-54-61-000-002
27-51-44-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Extension of the Flaps on the Ground
Removal of the Flap Kink-Seals and Cushion-Seals
Fig. 401

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-51-44-991-001)
Subtask 27-51-44-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S) in position to tell persons not to operate
the flap/slat controls.
Subtask 27-51-44-860-052
B. Aircraft Maintenance Configuration
(1) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap/slat control lever (Ref. TASK 27-00-00480-002).
Subtask 27-51-44-865-059
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-44



AIJ




Page 402
Nov 01/10

R
R

Interconnecting Strut - Location and Detail


Figure 401/TASK 27-51-44-991-001



EFF :
ALL
 27-51-44



AIJ




Page 403
Feb 01/07

Subtask 27-51-44-010-056
D. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
(2) Remove the lower kink seal, the cushion seals and the upper kink
seals from the flaps (Ref. TASK 27-54-61-000-002).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-44-020-050
A. Removal of the Interconnecting Strut
(1) Remove the electrical connectors (10) and (11) from the connectors
(9) and (8) on the inboard flap.
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Remove and discard the cotter pins (7) and (12).
(4) Hold the interconnecting strut (1).
(5) Remove the nuts (6) and (13) and the washers (5) and (14).
(6) Remove the bolts (2) and (15) and remove the interconnecting strut
(1).
(7) Remove the washer (3) and the bush (4).



EFF :
ALL
 27-51-44



AIJ




Page 404
May 01/10

TASK 27-51-44-400-001
Installation of the Interconnecting Strut
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No
No

specific
specific
specific
specific
specific

98D27803000000

circuit breaker(s) safety clip(s)


AR ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-44



AIJ




Page 405
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 15-008
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 2
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------7
12

cotter pin
cotter pin

27-51-05 01 -010
27-51-05 01 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002

R
R

27-50-00-866-008
27-51-44-820-001
27-51-44-960-001
27-54-00-710-001
27-54-61-000-002
27-54-61-400-006
27-51-44-991-001
27-51-44-991-004

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Extension of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Replacement of the Flap Interconnecting Strut Rod-End
and Locking Device
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Fig. 401
Fig. 402



EFF :
ALL
 27-51-44



AIJ




Page 406
May 01/10

3. __________
Job Set-up
Subtask 27-51-44-941-061
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flap/slat controls.
Subtask 27-51-44-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the lower kink seal, the cushion seals and the upper
kink seals are removed from the flaps (Ref. TASK 27-54-61-000-002).
(2) Make sure that the flaps are extended to position 1 (Ref. TASK 27-5000-866-008).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever (Ref. TASK 27-0000-480-002).
(4) Make sure that the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE is in
position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
Subtask 27-51-44-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-51-44



AIJ




Page 407
Nov 01/10

Subtask 27-51-44-420-057
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R
R

(3) Make sure that the rod-end and the locking device (located between
the locknut and nut) are not worn or damaged. Replace a worn or
dameged rod-end, or a worn or damaged locking device (Ref. TASK 2751-44-960-001).

(4) Do an inspection of the component interface and/or the adjacent area.


Subtask 27-51-44-420-055
B. Installation of the Interconnecting Strut
(1) Install the washer (3) and the bush (4).
(2) Put the interconnecting strut (1) in the correct position for
installation. Make sure that the position is correct as follows:
(a) The TOP indication on the interconnecting strut (1) is at the
top.
(b) The flanged bush on the interconnecting strut (1) is at the top.
(c) The inspection/setting hole/s is/are at the bottom.
NOTE : The strut can have one or two inspection/setting holes.
____
(3) Install the bolt (2), the washer (5) and the nut (6).
(4) Install the bolt (15), the washer (14) and the nut (13).



EFF :
ALL
 27-51-44



AIJ




Page 408
May 01/10

(5) TORQUE the nut (6) to between 1.1 and 1.7 m.daN (97.34 and 150.44
lbf.in).

(6) Install the new cotter pin (7).

(7) TORQUE the nut (13) to between 1.1 and 1.7 m.daN (97.34 and 150.44
lbf.in).

R
R

NOTE : It is possible to have a clearance between the flange of the


____
bush and the strut attachment bracket. This is satisfactory.

(8) Install the new cotter pin (12).

R
R
R

(9) Remove the blanking caps from the electrical connectors (8), (9),
(10) and (11).
(Ref. Fig. 402/TASK 27-51-44-991-004)

R
R

(10) Make sure that the electrical connectors are clean and in the correct
condition.

R
R

(11) Connect the electrical connectors (10) and (11) to their related
connectors (9) and (8) on the inboard flap.

R
R
R

(12) Clean the electrical connectors (10) and (11) with a MISCELLANEOUS
(Material No. 19-003) made moist with CLEANING AGENTS (Material No.
11-026).

R
R

(13) Apply a continuous layer of STORAGE PRESERVATION (Material No. 15008) to the electrical connectors (10) and (11).

Subtask 27-51-44-820-050-A

C. Adjustment of the Interconnecting Strut

R
R

(1) Do the adjustment of the interconnecting strut (1) (Ref. TASK 27-5144-820-001).
Subtask 27-51-44-865-062

D. Open, safety and tag this(these) circuit breaker(s):


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-44



AIJ




Page 409
Aug 01/07

Interconnecting Strut - Electrical Connections


Figure 402/TASK 27-51-44-991-004



EFF :
ALL
 27-51-44



AIJ




Page 410
Aug 01/08

Subtask 27-51-44-420-051
R
R

E. Installation of the Interconnecting Strut

(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:


- the bolt (2), the nut (6), the washer (5) and the cotter pin (7)
- the bolt (15), the nut (13), the washer (14) and the cotter pin
(12).
Subtask 27-51-44-865-052

F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-44-710-050

G. Test

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-51-44-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the lower kink seal, the cushion seals and the upper kink
seals on the flaps (Ref. TASK 27-54-61-400-006).
Subtask 27-51-44-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-51-44



AIJ




Page 411
Aug 01/07

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-44


R 
AIJ




Page 412
Aug 01/07

TASK 27-51-44-000-002
Removal of the Proximity-Sensor of the Interconnecting Strut
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27803000000

blanking caps
circuit breaker(s) safety clip(s)
safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-44



AIJ




Page 413
Aug 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-50-00-866-008
27-54-61-000-002
27-51-44-991-003

Extension of the Flaps on the Ground


Removal of the Flap Kink-Seals and Cushion-Seals
Fig. 403

3. __________
Job Set-up
Subtask 27-51-44-941-060
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the flap/slat controls.
Subtask 27-51-44-860-060
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap/slat control lever.
Subtask 27-51-44-865-070
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-44



AIJ




Page 414
Aug 01/08

Subtask 27-51-44-010-055
D. Get Access
(1) Put the access platform in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
(2) Remove the lower kink seal, the cushion seals and the upper kink
seals from the flaps (Ref. TASK 27-54-61-000-002).
4. Procedure
_________
(Ref. Fig. 403/TASK 27-51-44-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-44-020-051
A. Removal of the Proximity Sensor
(1) Disconnect the applicable electrical connector(s) (11) and/or (12).
(2) Put blanking caps on the applicable electrical connector(s) (10)
and/or (13).
(3) Remove the applicable proximity sensor (1):
R
R

(a) FOR 37CV, 38CV

R
R

1
_

Remove the nuts (2), the bolts (5) and the washers (4).

2
_

Remove the proximity sensor (1) from the bracket (3).



R
EFF :
ALL
 27-51-44



AIJ




Page 415
May 01/10

Details of the Proximity-Sensors 37CV (38CV), 39CV (40CV)


Figure 403/TASK 27-51-44-991-003


R
EFF :
ALL
 27-51-44



AIJ




Page 416
May 01/10

(4) Remove the applicable proximity sensor (14):


(a) FOR 39CV, 40CV
1
_

Remove the nuts (9), the bolts (6) and the washers (7).

2
_

Remove the proximity sensor (14) from the bracket (8).



EFF :
ALL
 27-51-44


R 
AIJ




Page 417
Nov 01/10

INTENTIONALLY BLANK



R

 27-51-44



AIJ




Page 418
May 01/10

TASK 27-51-44-400-002
Installation of the Proximity-Sensor of the Interconnecting Strut
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000
FOR FIN 39CV, 40CV
98D27504031000

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
1 PIN-SETTING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-51-44



AIJ




Page 419
Aug 01/07

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-866-009
27-51-00-710-002
R
R

27-54-61-000-002
27-54-61-400-006
27-51-44-991-003

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap Interconnecting Strut
and the Flap-Attachment Failure-Detection Sensors
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 403/TASK 27-51-44-991-003)
Subtask 27-51-44-941-062
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-51-44-860-061
B. Aircraft Maintenance Configuration
(1) Make sure that the lower kink seal, the cushion seals and the upper
kink seals are removed from the flaps (Ref. TASK 27-54-61-000-002).
(2) Make sure that the flaps are extended at position 1 (Ref. TASK 27-5000-866-009).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) is on the flap/slat
control lever.
(4) Make sure that the access platform is in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.



EFF :
ALL
 27-51-44



AIJ




Page 420
Aug 01/08

Subtask 27-51-44-865-071
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 403/TASK 27-51-44-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-44-420-058
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 27-51-44-420-052
R

B. Installation of the Proximity Sensor


(1) Put the applicable proximity sensor (1) in position on the bracket
(3):
(a) FOR 37CV, 38CV
(b) Install the bolts (5), the washers (4) and the nuts (2). Do not
tighten the nuts (2).



EFF :
ALL
 27-51-44



AIJ




Page 421
May 01/10

(2) Put the applicable proximity sensor (14) in position on the bracket
(8):
(a) FOR 39CV, 40CV
(b) Install the bolts (6), the washers (7) and the nuts (9). Do not
tighten the nuts (9).
(3) Install the PIN-SETTING (98D27504031000) in the interconnecting strut
(15).
R
R

(4) Make sure that the dimension X is between 0.3 mm (0.012 in.) and 0.7
mm (0.027 in.).
(5) Tighten the applicable nuts (2) or (9).
(6) Make sure that the dimension X has stayed correct.
(7) Remove the blanking cap from the electrical applicable connector (10)
or (13).
(8) Connect the applicable electrical connector (11) or (12).
(9) Remove the PIN-SETTING from the interconnecting strut (15).
(10) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) from the slat/flap control lever.
Subtask 27-51-44-865-072
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-44-710-054
D. Test
(1) Do an operational test of the failure detection sensors for the flap
attachment (Ref. TASK 27-51-00-710-002).



EFF :
ALL
 27-51-44



AIJ




Page 422
May 01/10

5. Close-up
________
Subtask 27-51-44-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the upper and the lower kink-seals (Ref. TASK 27-54-61-400006).
Subtask 27-51-44-942-055
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-44


R 
AIJ




Page 423
Feb 01/07

STRUT - INTERCONNECTING - ADJUSTMENT/TEST


_________________________________________
TASK 27-51-44-820-001
Adjustment of the Interconnecting Strut
1. __________________
Reason for the Job
To adjust the rigged position of the interconnecting strut.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

98D27504031000
98D27803000000

access platform 3.5 m (11 ft. 6 in.)


AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 PIN-SETTING
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-010

USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-866-008
27-50-00-866-009
27-51-00-820-003
27-51-44-960-001
27-54-00-710-001
27-54-61-000-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Replacement of the Flap Interconnecting Strut Rod-End
and Locking Device
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals



EFF :
ALL
 27-51-44



AIJ




Page 501
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-61-400-006
31-32-00-860-006
27-51-44-991-005

Installation of the Flap Kink-Seals and Cushion-Seals


Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 501

3. __________
Job Set-up
Subtask 27-51-44-941-063
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flap/slat controls.
Subtask 27-51-44-860-064
B. Aircraft Maintenance Configuration
(1) Make sure that the lower kink seal, the cushion seals and the upper
kink seals are removed from the flaps (Ref. TASK 27-54-61-000-002).
(2) Make sure that the flaps are extended to position 1 (Ref. TASK 27-5000-866-008).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever (Ref. TASK 27-0000-480-002).
(4) Make sure that the access platform is in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
(5) Make sure that the rod-end (4), and the locking device located
between the locknut (1) and the nut (2), are not worn or damaged.
Replace a worn or damaged rod-end, or a worn or damaged locking
device (Ref. TASK 27-51-44-960-001).



EFF :
ALL
 27-51-44



AIJ




Page 502
Nov 01/10

Subtask 27-51-44-865-074
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 501/TASK 27-51-44-991-005)
Subtask 27-51-44-820-053
R

A. Adjustment of the Interconnecting Strut


(1) Install the PIN-SETTING (98D27504031000) in the inspection/rigging
hole of the interconnecting strut (3).

R
R
R
R

NOTE : The interconnecting strut (3) can have one or two


____
inspection/setting holes. If there are two, use the hole that
is not blocked by the aircraft structure.

R
R

(2) If necessary, adjust the actuating rod of the interconnecting strut


(3) so that you can install the PIN-SETTING as follows:

R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
_______
REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
LOCKWIRE CAN CUT OR BLIND YOU.
(a) If necessary, remove and discard the lockwire from the locknut
(1).
(b) Loosen the locknut (1) sufficiently to let you turn the nut (2).
(c) Adjust the nut (2) until you can install the PIN-SETTING. Make
sure that you can see the threads of the rod-end (4) through the
check hole. If you cannot see the threads of the rod-end (4)
through the check hole, check the flap rigging (Ref. TASK 27-5100-820-003).

R
R
R

(d) Torque the locknut (1) to between 5.1 and 5.9 m.daN (37.61 and
43.51 lbf.ft).



EFF :
ALL
 27-51-44



AIJ




Page 503
May 01/08

Adjustment of the Interconnecting Strut


Figure 501/TASK 27-51-44-991-005



EFF :
ALL
 27-51-44



AIJ




Page 504
May 01/08

(e) Safety the locknut (1) with MISCELLANEOUS (Material No. 19-010).
(3) Remove the PIN-SETTING from the hole in the interconnecting strut
(3).
Subtask 27-51-44-865-075
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-51-44-710-056
C. Test
(1) Get access to the flight controls (F/CTL) page of the MCDU (Ref. TASK
31-32-00-860-006).
(2) Do this test of the flap interconnecting strut and the
flap-attachment failure-detection sensors:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the MCDU:

On the MCDU:

1. Push (in) the line key < SFCC 1.

- the MCDU shows the SFCC 1 page.

2. Push (in) the line key SYSTEM


STATUS FLP >.

- the MCDU shows the SFCC 1 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 1 NO SFCC 2 DATA CHECK WIRING &
SFCC 2
- FLP 1 FAULTY FLP 2 DATA CHECK SFCC
1 OR 2
- NO LGCIU 1 DATA CHECK WIRING TO FLP
1
- FLP LH PROX SNSR 1 MISADJUSTMENT
and FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP RH PROX SNSR 1 MISADJUSTMENT
and FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2



EFF :
ALL
 27-51-44



AIJ




Page 505
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2.
3. Push (in) the line key <RETURN.

- the MCDU shows the SFCC 1 page.

4. Push (in) the line key <RETURN.

- the MCDU shows the SYSTEM REPORT/TEST


PAGE.

5. Push (in) the line key < SFCC 2.

- the MCDU shows the SFCC 2 page.

6. Push (in) the line key SYSTEM


STATUS FLP >.

- the MCDU shows the SFCC 2 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 2 NO SFCC 1 DATA CHECK WIRING &
SFCC 1
- FLP 2 FAULTY FLP 1 DATA CHECK SFCC
1 OR 2
- NO LGCIU 2 DATA CHECK WIRING TO FLP
2
- FLP LH PROX SNSR 2 MISADJUSTMENT
and FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP RH PROX SNSR 2 MISADJUSTMENT
and FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2.

Subtask 27-51-44-710-057
D. Complete Test
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slatcontrol lever on panel 114VU.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).



EFF :
ALL
 27-51-44


R 
AIJ




Page 506
Feb 01/11

5. Close-up
________
Subtask 27-51-44-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the lower kink seal, the cushion seals and the upper kink
seals on the flaps (Ref. TASK 27-54-61-400-006).
(3) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-51-44-942-057
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-44


R 
AIJ




Page 507
Feb 01/07

STRUT - INTERCONNECTING - INSPECTION/CHECK


__________________________________________
TASK 27-51-44-200-001
Detailed Inspection of Interconnecting Strut and Attachments
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275144-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
R
R

specific
specific
specific
specific
specific

1
AR

No specific
98D27504008000
98D27504031000
98D27803000000

1
1
1

circuit breaker(s) safety clip(s)


safety barriers
GAGE - SET, FEELER
WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
GAGE - GO/NO GO
PIN-SETTING
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-44



AIJ




Page 601
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 19-003
Material No. 19-010

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------14

cotter pin

27-51-05 01 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-51-00-710-002
27-51-00-820-003
27-51-44-960-001
R
27-54-00-710-001
27-54-61-000-002
27-54-61-400-006
31-32-00-860-006
27-51-44-991-002
27-51-44-991-007

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Operational Test of the Flap Interconnecting Strut
and the Flap-Attachment Failure-Detection Sensors
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Replacement of the Flap Interconnecting Strut Rod-End
and Locking Device
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 601
Fig. 602



EFF :
ALL
 27-51-44



AIJ




Page 602
May 01/10

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-51-44-991-002)
Subtask 27-51-44-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flap controls.
Subtask 27-51-44-860-059
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(3) Remove the applicable upper and lower kink-seals (1) and (2) from the
inboard and the outboard flaps (Ref. TASK 27-54-61-000-002).
(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(5) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
(6) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
Subtask 27-51-44-865-068
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-44



AIJ




Page 603
Nov 01/10

R
R

Flap Interconnecting Strut - Inspection/Check


Figure 601/TASK 27-51-44-991-002



EFF :
ALL
 27-51-44



AIJ




Page 604
Feb 01/07

Subtask 27-51-44-020-054
D. Preparation for Inspection
(Ref. Fig. 601/TASK 27-51-44-991-002)
(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean the flap interconnecting strut
and the flap attachment brackets (5) and (8).
(2) Remove and discard the cotter pin (14).
(3) Remove the nut (15), the washer (13) and the bolt (16).
(4) Disconnect the flap interconnecting strut from the attachment bracket
(8).
(5) Pull the actuating rod out of the flap interconnecting strut until it
touches the internal limit.
4. Procedure
_________
(Ref. Fig. 601/TASK 27-51-44-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-44-210-053
R

A. inspection of the Interconnecting Strut and Attachments


(Ref. Fig. 602/TASK 27-51-44-991-007)
(1) Do an inspection of the actuating rod for damage and corrosion.
(2) Do an inspection of the flap interconnecting-strut internal
structure, through the inspection holes (7), for damage and
corrosion.
(3) Do an inspection of the flap interconnecting strut for:
- cracks
- damage
- corrosion
- damaged paint and sealant
- correct condition of the electrical plugs (4)



EFF :
ALL
 27-51-44



AIJ




Page 605
May 01/10

Flap Interconnecting Strut - Radial Play


Figure 602/TASK 27-51-44-991-007



EFF :
ALL
 27-51-44



AIJ




Page 606
Aug 01/09

- correct condition of the electrical cables (3)


- correct condition of all the fasteners of the attachment brackets
(5) and (8)
- correct condition of all the safety devices
- correct condition of the bearings of the flap interconnecting
strut, as far as is possible
- correct condition of the bolts (6) and (16) as far as is possible.
R
R
R

(4) Make sure that the rod-end (9) or locking device (11) is not worn or
damaged. Replace a worn or damaged rod-end, or a worn or damaged
locking device (Ref. TASK 27-51-44-960-001).
(5) Make sure that the word TOP on the flap interconnecting strut is at
the top.
(6) Do a check of the radial play of the actuating rod of the
interconnecting strut as follows:
(a) Make sure that the actuating rod is fully extended.
(b) Make sure that the actuating rod is moved until space Y is closed
on the other side of the forward bush.
(c) Use a GAGE - SET, FEELER and make sure that the dimension X
(between the actuating rod and the forward bush) is not more than
0.4 mm (0.0157 in.). If the dimension X is more than 0.4 mm
(0.0157 in.) the interconnecting strut must be replaced.
(7) Do an operational test of the flap interconnecting strut and the
flap-attachment failure-detection sensors (Ref. TASK 27-51-00-710002).
5. Close-up
________
(Ref. Fig. 601/TASK 27-51-44-991-002, 602/TASK 27-51-44-991-007)
Subtask 27-51-44-420-056
A. Connection of the Interconnecting Strut to the Flap Attachment Bracket
(1) Push the actuating rod in to the flap interconnecting strut until it
touches the internal limit.
(2) Put the interconnecting strut in position in the attachment bracket
(8).
(3) Install the bolt (16), the washer (13) and the nut (15).



EFF :
ALL
 27-51-44



AIJ




Page 607
May 01/10

(4) Make sure that the interconnecting strut is correctly set as follows:
(a) Retract the flaps to position 1 (Ref. TASK 27-50-00-866-009).
NOTE : The GO/NO GO GAGE is installed through the
____
inspection/setting hole and a groove in the actuating rod.
When the strut is set during its initial installation the
inspection/setting hole and the groove align fully. After
flap operation, because of the flap tolerances, the
inspection/setting hole and the actuating rod groove will
not fully align. This is permitted if the check with the
GO/NO GAGE is satisfactory.
If the GO/NO GO GAGE can be installed, the interconnecting
strut is correctly set. If not, the strut is incorrectly
set and must be adjusted.
NOTE : The interconnecting strut can have one or two
____
inspection/setting holes. If there are two, use the hole
that is not blocked by the aircraft structure.
R

(b) Install the GAGE - GO/NO GO (98D27504008000) in the


inspection/setting hole. The strut is correctly set if the gage
goes fully into the inspection/setting hole.
(c) If the gage does not go fully into the inspection/setting hole:

1
_

Remove the GAGE - GO/NO GO.

2
_

Remove the nut (15), the washer (13), and the bolt (16).

3
_

Disconnect the the interconnecting strut from the attachment


bracket (8).

4
_

Do the adjustment of the interconnecting strut given in Para


5.B.

(d) If no adjustment of the interconnecting strut is necessary:


R

1
_

Remove the GAGE - GO/NO GO.

2
_

TORQUE the nut (15) to between 1.1 and 1.7 m.daN (97.34 and
150.44 lbf.in).

3
_

Install a new cotter pin (14).



EFF :
ALL
 27-51-44



AIJ




Page 608
May 01/09

(5) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-51-44-820-054
B. Adjustment of the Interconnecting Strut (if necessary)
(1) Install the PIN-SETTING (98D27504031000) in the inspection/setting
hole in the interconnecting strut (1).
NOTE : The interconnecting strut can have one or two
____
inspection/setting holes. If there are two, use the hole that
is not blocked by the aircraft structure.
(2) If necessary, adjust the actuating rod of the interconnecting strut
so that you can install the PIN-SETTING as follows:
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK.
_______
LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
(a) Align the rod-end (9) with the flap until you can install the
bolt (16).
(b) If necessary, remove and discard the lockwire from the locknut
(10).
(c) Loosen the locknut (10).
(d) Adjust the nut (12) until you can
sure that you can see the threads
check hole. If you cannot see the
through the check hole, check the
00-820-003).

install the PIN-SETTING. Make


of the rod-end (9) through the
threads of the rod-end (9)
flap rigging (Ref. TASK 27-51-

(e) Tighten the locknut (10).


(f) Install the washer (13) and the nut (15).
(g) Torque the nut (15) to between 1.1 and 1.7 m.daN (97.34 and
150.44 lbf.in).
NOTE : It is possible to have a clearance between the bush and
____
the strut attachment bracket.
(h) Install a new cotter pin (14).



EFF :
ALL
 27-51-44


R 
AIJ




Page 609
Feb 01/07

(i) If you loosened the locknut (10), TORQUE it to between 5.1 and
5.9 m.daN (37.61 and 43.51 lbf.ft).
(j) Safety the locknut (10) with MISCELLANEOUS (Material No. 19-010).
(3) Remove the PIN-SETTING from the inspection/setting hole in the
interconnecting strut.
(4) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


head of the bolt (16)
nut (15)
washer (13)
cotter pin (14).

Subtask 27-51-44-865-069
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-51-44-710-058
D. Test
(1) Get access to the flight controls (F/CTL) page of the MCDU (Ref. TASK
31-32-00-860-006).
(2) Do this test of the flap interconnecting strut and the
flap-attachment failure-detection sensors:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the MCDU:

On the MCDU:

1. Push (in) the line key < SFCC 1.

- the MCDU shows the SFCC 1 page.

2. Push (in) the line key SYSTEM


STATUS FLP >.

- the MCDU shows the SFCC 1 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 1 NO SFCC 2 DATA CHECK WIRING &
SFCC 2
- FLP 1 FAULTY FLP 2 DATA CHECK SFCC
1 OR 2
- NO LGCIU 1 DATA CHECK WIRING TO FLP
1



EFF :
ALL
 27-51-44



AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- FLP LH PROX SNSR 1 MISADJUSTMENT
and FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP RH PROX SNSR 1 MISADJUSTMENT
and FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2.
3. Push (in) the line key <RETURN.

- the MCDU shows the SFCC 1 page.

4. Push (in) the line key <RETURN.

- the MCDU shows the SYSTEM REPORT/TEST


PAGE.

5. Push (in) the line key < SFCC 2.

- the MCDU shows the SFCC 2 page.

6. Push (in) the line key SYSTEM


STATUS FLP >.

- the MCDU shows the SFCC 2 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 2 NO SFCC 1 DATA CHECK WIRING &
SFCC 1
- FLP 2 FAULTY FLP 1 DATA CHECK SFCC
1 OR 2
- NO LGCIU 2 DATA CHECK WIRING TO FLP
2
- FLP LH PROX SNSR 2 MISADJUSTMENT
and FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP LH PROX SNSR 2 OR WIRING TO
LGCIU 2
- FLP RH PROX SNSR 2 MISADJUSTMENT
and FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1
- FLP RH PROX SNSR 1 OR WIRING TO
LGCIU 1



EFF :
ALL
 27-51-44



AIJ




Page 611
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- FLP RH PROX SNSR 2 OR WIRING TO
LGCIU 2.
Subtask 27-51-44-860-058
E. Aircraft Maintenance Configuration
R

(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(2) Install the upper and lower kink-seals (1) and (2) to the inboard and
the outboard flaps (Ref. TASK 27-54-61-400-006).
(3) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
Subtask 27-51-44-710-053
F. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
Subtask 27-51-44-942-054
G. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-44



AIJ




Page 612
Aug 01/07

TASK 27-51-44-960-001
Replacement of the Flap Interconnecting Strut Rod-End and Locking Device
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
R
R

specific
specific
specific
specific

No specific
98D27504031000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 PIN-SETTING
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-44



AIJ




Page 613
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 19-003
Material No. 19-010

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------14

cotter pin

27-51-05 01 -100

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-51-00-710-002
27-51-00-820-003
27-54-00-710-001
27-54-61-000-002
27-54-61-400-006
31-32-00-860-006
27-51-44-991-002

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Operational Test of the Flap Interconnecting Strut
and the Flap-Attachment Failure-Detection Sensors
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 601



EFF :
ALL
 27-51-44


R 
AIJ




Page 614
Feb 01/11

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-51-44-991-002)
Subtask 27-51-44-941-064
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in position to tell persons not to operate
the flap controls.
Subtask 27-51-44-860-066
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
(1) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(3) Remove the applicable upper and lower kink-seals (1) and (2) from the
inboard and the outboard flaps (Ref. TASK 27-54-61-000-002).

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(5) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

(6) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
Subtask 27-51-44-865-076
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-51-44



AIJ




Page 615
Aug 01/07

4. Procedure
_________
Subtask 27-51-44-020-056
R

A. Preparation for Replacement of the Rod-End and Locking Device


(Ref. Fig. 601/TASK 27-51-44-991-002)
(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean the flap interconnecting strut
and the flap attachment brackets (5) and (8).
(2) Remove and discard the cotter pin (14).
(3) Remove the nut (15), the washer (13) and the bolt (16).
(4) Disconnect the flap interconnecting strut from the attachment bracket
(8).
(5) Pull the actuating rod out of the flap interconnecting strut until it
touches the internal limit.
Subtask 27-51-44-960-050

B. Replace the Interconnecting Strut Assembly Rod-End


(1) Remove and discard the lockwire from the locknut (10).
(2) Loosen the locknut (10).
(3) Remove the rod end (9).
(4) Remove and retain the locking device (11).
(5) Remove the locknut (10) from the rod-end (9). Discard the rod-end
(9).
(6) Install the locknut (10) on the replacement rod-end (9).
(7) Install the locking device (11).
(8) Install the replacement rod end. (9)
(9) Put the interconnecting strut in position in the attachment bracket
(8).



EFF :
ALL
 27-51-44



AIJ




Page 616
May 01/10

(10) Install the bolt (16), the washer (13) and the nut (15).
R
R
R

NOTE : You can do this procedure at the same time as you do the
____
procedure to replace the locking device (11).
Subtask 27-51-44-960-051

C. Replace the Interconnecting Strut Assembly Locking Device

(1) Remove and discard the lockwire from the locknut (10).

(2) Loosen the locknut (10).

(3) Remove the rod end (9).

(4) Remove and discard the locking device (11).

(5) Install the replacement locking device (11) locking device (11).

(6) Install the rod end.

R
R

(7) Put the interconnecting strut in position in the attachment bracket


(8).

(8) Install the bolt (16), the washer (13) and the nut (15).

R
R

NOTE : You can do this procedure at the same time as you do the
____
procedure to replace the rod end (9).
5. Close-up
________
Subtask 27-51-44-820-055
A. Adjustment of the Interconnecting Strut (if necessary)
(1) Install the PIN-SETTING (98D27504031000) in the inspection/setting
hole in the interconnecting strut (1).
NOTE : The interconnecting strut can have one or two
____
inspection/setting holes. If there are two, use the hole that
is not blocked by the aircraft structure.
(2) If necessary, adjust the actuating rod of the interconnecting strut
so that you can install the PIN-SETTING as follows:
(a) Align the rod-end (9) with the flap until you can install the
bolt (16).



EFF :
ALL
 27-51-44



AIJ




Page 617
May 01/10

(b) If necessary, remove and discard the lockwire from the locknut
(10).
(c) Loosen the locknut (10) sufficiently to let you turn the nut
(12).
(d) Adjust the nut (12) until you can
sure that you can see the threads
check hole. If you cannot see the
through the check hole, check the
00-820-003).

install the PIN-SETTING. Make


of the rod-end (9) through the
threads of the rod-end (9)
flap rigging (Ref. TASK 27-51-

(e) Tighten the locknut (10).


(f) Install the washer (13) and the nut (15).
(g) Torque the nut (15) to between 1.1 and 1.7 m.daN (97.34 and
150.44 lbf.in).
NOTE : It is possible to have a clearance between the bush and
____
the strut attachment bracket.
(h) Install a new cotter pin (14).
(i) If you loosened the locknut (10), TORQUE it to between 5.1 and
5.9 m.daN (37.61 and 43.51 lbf.ft).
(j) Safety the locknut (10) with MISCELLANEOUS (Material No. 19-010).
(3) Remove the PIN-SETTING from the inspection/setting hole in the
interconnecting strut.
(4) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


head of the bolt (16)
nut (15)
washer (13)
cotter pin (14).

(5) Do an operational test of the flap interconnecting strut and the


flap-attachment failure-detection sensors (Ref. TASK 27-51-00-710002).
Subtask 27-51-44-865-077
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-51-44


R 
AIJ




Page 618
May 01/10

Subtask 27-51-44-710-059
C. Test
(1) Get access to the flight controls (F/CTL) page of the MCDU (Ref. TASK
31-32-00-860-006)
(2) Do this test of the flap interconnecting strut and the
flap-attachment failure-detection sensors:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------On the MCDU:

On the MCDU:

1. Push (in) the line key < SFCC 1.

- the MCDU shows the SFCC 1 page.

1. Push (in) the line key SYSTEM


STATUS FLP >.

- the MCDU shows the SFCC 1 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 1 NO SFCC 2 DATA CHECK WIRING &
SFCC 2
- FLP 1 FAULTY FLP 2 DATA CHECK SFCC 1
OR 2
- NO LGCIU 1 DATA CHECK WIRING TO FLP 1
- FLP LH PROX SNSR 1 MISADJUSTMENT and
FLP LH PROX SNSR 2 OR WIRING TO LGCIU 2
- FLP LH PROX SNSR 1 OR WIRING TO LGCIU
1
- FLP LH PROX SNSR 2 OR WIRING TO LGCIU
2
- FLP RH PROX SNSR 1 MISADJUSTMENT and
FLP RH PROX SNSR 2 OR WIRING TO LGCIU 2
- FLP RH PROX SNSR 1 OR WIRING TO LGCIU
1
- FLP RH PROX SNSR 2 OR WIRING TO LGCIU
2.
- FLP RH PROX SNSR 2 OR WIRING TO LGCIU
2.
- the MCDU shows the SFCC 1 page.

4. Push (in) the line key <RETURN. - the MCDU shows the SYSTEM REPORT/TEST
PAGE.



EFF :
ALL
 27-51-44



AIJ




Page 619
Feb 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------5. Push (in) the line key < SFCC
- the MCDU shows the SFCC 2 page.
2.
6. Push (in) the line key SYSTEM
STATUS FLP >.

- the MCDU shows the SFCC 2 SYSTEM


STATUS FLAP page. These subsequent
messages must not occur:
- FLP 2 NO SFCC 1 DATA CHECK WIRING &
SFCC 1
- FLP 2 FAULTY FLP 1 DATA CHECK SFCC 1
OR 2
- NO LGCIU 2 DATA CHECK WIRING TO FLP 2
- FLP LH PROX SNSR 2 MISADJUSTMENT and
FLP LH PROX SNSR 1 OR WIRING TO LGCIU 1
- FLP LH PROX SNSR 1 OR WIRING TO LGCIU
1
- FLP LH PROX SNSR 2 OR WIRING TO LGCIU
2
- FLP RH PROX SNSR 2 MISADJUSTMENT and
FLP RH PROX SNSR 1 OR WIRING TO LGCIU 1
- FLP RH PROX SNSR 1 OR WIRING TO LGCIU
1
- FLP RH PROX SNSR 2 OR WIRING TO LGCIU
2.

Subtask 27-51-44-860-067
D. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(2) Install the upper and lower kink-seals (1) and (2) to the inboard and
the outboard flaps (Ref. TASK 27-54-61-400-006).
(3) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
Subtask 27-51-44-710-060
E. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).



EFF :
ALL
 27-51-44


R 
AIJ




Page 620
Feb 01/11

Subtask 27-51-44-942-058
F. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-44



AIJ




Page 621
May 01/10

BRAKE - WING TIP (WTB) (33CV,34CV) - REMOVAL/INSTALLATION


_________________________________________________________
TASK 27-51-51-000-001
Removal of the Flap Wing-Tip Brake
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27604000000
98D27803000000

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-51-51



AIJ




Page 401
Nov 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-54-45-000-008
27-54-45-000-011

27-60-00-866-002
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
27-51-51-991-001
FOR FIN 33CV
57-51-37-000-004
FOR FIN 34CV
57-51-37-000-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Removal of the Torque Shafts
6224CM(6274CM)/6230CM(6280CM)
Extension-Retraction of the Spoilers for Maintenance
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 401
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-51-51-991-001)


Subtask 27-51-51-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to pressurize
the hydraulic systems.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.



EFF :
ALL
 27-51-51



AIJ




Page 402
Feb 01/07

R
R

Flap Wing-Tip Brake 33CV(34CV)


Figure 401/TASK 27-51-51-991-001



EFF :
ALL
 27-51-51



AIJ




Page 403
Feb 01/07

Subtask 27-51-51-860-050
B. Aircraft Maintenance Configuration
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the


flap/slat control lever.
(3) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-002) and (Ref. TASK 29-1000-864-003).
(4) Depressurize the reservoirs of the Green, Yellow and Blue hydraulic
systems.
(Ref. TASK 29-14-00-614-001).
(5) Remove the safety collar from the circuit breakers 10CV and 12CV.
Subtask 27-51-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-51-010-051
D. Get Access
(1) Put the access platform in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.



EFF :
ALL
 27-51-51



AIJ




Page 404
Aug 01/07

(2) Remove the access panels:


(a) FOR 33CV
remove 575DB, 575EB (Ref. TASK 57-51-37-000-004)
(b) FOR 34CV
remove 675DB, 675EB (Ref. TASK 57-51-37-000-004).
(3) Put the No. 3 spoiler into the M (Maintenance) position (Ref. TASK
27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
Subtask 27-51-51-480-050
E. Installation of Support Equipment
(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) at
these positions (Ref. TASK 27-50-00-400-003):
- for 33CV, on the torque shafts 6226CM and 6230CM
- for 34CV, on the torque shafts 6276CM and 6280CM.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-51-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-51-020-052
A. Removal of the Wing-Tip Brake (WTB)
(1) Disconnect the electrical connectors (7) and (10).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Disconnect the hydraulic lines (13), (16), (29) and (34).
(4) Put blanking plugs on the disconnected line ends.



EFF :
ALL
 27-51-51



AIJ




Page 405
Aug 01/11

(5) Remove the nut (6), the washer (5), the bolt (4) and the bonding
strap (2) from the T-piece (3).
(6) At the outboard side of the wing-tip brake (1), remove the nuts (27)
and the bolts (26).
(7) Move the torque shaft:
CAUTION : DO NOT MOVE THE TORQUE SHAFT TOO FAR SIDEWAYS. IT WILL
_______
CAUSE DAMAGE TO THE UNIVERSAL JOINT.
(a) Move the flanges of the torque shaft apart and remove the
universal joint (28) from the wing-tip brake (1). If the flanges
will not move apart sufficiently, remove the middle part of the
torque shaft (Ref. TASK 27-54-45-000-008) (Ref. TASK 27-54-45000-011).
(8) Remove and discard the cotter pin (22).
(9) Remove the nut (21), the washer (20) and the bolt (18).
(10) Hold the wing-tip brake (1) and remove the nuts (17).
(11) Remove the wing-tip brake (1).
(12) If you are to install a new wing-tip brake (1):
(a) Retain these items:
- the adapters (12), (15), (30) and (35)
- the nuts (23), the washers (24) and (25) and the brake support
(19)
- the T-piece (3).
(13) Discard the related O-rings (11), (14), (31) and (36).



EFF :
ALL
 27-51-51


R 
AIJ




Page 406
Aug 01/11

TASK 27-51-51-400-001
Installation of the Flap Wing-Tip Brake
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific

safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)
Torque Wrench : range 0.00 to 1.20
(0.00 to
Torque Wrench : range 0.20 to 3.60
(2.00 to

m.daN
9.00 lbf.ft)
m.daN
26.00 lbf.ft)



EFF :
ALL
 27-51-51



AIJ




Page 407
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
R

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

Material No. 04-018


Material No. 04-022
Material No. 09-018
R
Material No. 09-019
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------11
14
22
31
36

O-ring
O-ring
cotter pin
O-ring
O-ring

29-11-05
27-54-05
27-54-05
27-54-05
29-12-05



EFF :
ALL
 27-51-51



AIJ




07K-060
41 -050
25F-240
40 -040
25B-030

Page 408
Nov 01/08

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
20-28-00-912-004
27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-51-00-710-001
27-54-45-400-008
27-54-45-400-011
27-60-00-866-002
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
57-51-37-000-004
57-51-37-400-004
R

27-51-51-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Operational Test of the Wing Tip Brake and the
Pressure Off Brake
Installation of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Installation of the Torque Shafts
6224CM(6274CM)/6230CM(6280CM)
Extension-Retraction of the Spoilers for Maintenance
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401



EFF :
ALL
 27-51-51



AIJ




Page 409
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-51-51-991-001)
Subtask 27-51-51-941-060
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to pressurize the hydraulic systems.
(3) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-51-51-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are extended fully (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
attached to the flap/slat control lever on panel 114VU.
(3) Make sure that the Green, Yellow and Blue hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864002) and (Ref. TASK 29-10-00-864-003).
(4) Make sure that the reservoirs of the Green, Blue and Yellow hydraulic
systems are depressurized.
(Ref. TASK 29-14-00-614-001).
(5) Make sure that the safety collar from the circuit breakers 10CV and
12CV is removed.
(6) Make sure that the access platform is in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
(7) Make sure that the access panels are removed (Ref. TASK 57-51-37-000004):
- for 33CV, panels 575DB, 575EB
- for 34CV, panels 675DB, 675EB.



EFF :
ALL
 27-51-51



AIJ




Page 410
Aug 01/07

(8) Make sure that the No. 3 spoiler is in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(9) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
R

(10) Make sure that the


at these positions
- for 33CV, on the
- for 34CV, on the

LOCK-TORQUE SHAFT (FLAPS AND SLATS) are installed


(Ref. TASK 27-50-00-400-003):
torque shafts 6226CM and 6230CM
torque shafts 6276CM and 6280CM.

Subtask 27-51-51-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
(Ref. Fig. 401/TASK 27-51-51-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-51-420-056
A. Preparation for Installation
(1) Clean the component interface and /or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-51-51



AIJ




Page 411
Nov 01/08

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
Subtask 27-51-51-560-050
B. Preparation of the Replacement Component
WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
_______
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Lubricate the new O-rings (11), (14), (31) and (36) with HYDRAULIC
FLUIDS (Material No. 02-003).
(2) Install the adaptors (12), (15), (30) and (35) as follows:
(a) Remove the blanking plugs at the positions (32) and (33). Discard
the related O-rings.
(b) Make sure that the blanking plugs (8) and (9) are safetied.
(3) Install the new O-rings as follows:
- the O-ring (11) on the adaptor (12)
- the O-ring (14) on the adaptor (15)
- the O-ring (31) on the adaptor (30)
- the O-ring (36) on the adaptor (35).
(4) Install the adaptors (12), (15), (30) and (35) at their related
position on the wing-tip brake (1).
(5) Install the T-piece (3) on the wing-tip brake (1).
(6) Use CLEANING AGENTS (Material No. 11-026) and a MISCELLANEOUS
(Material No. 19-003) to clean the spline surfaces at each end of the
wing-tip brake (1).
(7) Do one of the steps that follow:
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.



EFF :
ALL
 27-51-51


R 
AIJ




Page 412
Feb 01/07

(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
clean spline surfaces.
- or
(b) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
clean spline surfaces.
(8) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09019) to the mating face of the inboard side of the wing-tip brake
(1).
Subtask 27-51-51-420-051
C. Installation of the Wing-Tip Brake
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Put the wing-tip brake (1) in position on the outboard face of the
rib. Make sure that the locating stud is in the correct position.
(2) Make sure that:
- the torque shaft splines engage correctly in the wing-tip brake (1)
- you cannot see the spline engagement groove.
(3) Hold the wing-tip brake (1) and install the nuts (17).
(4) TORQUE the nuts (17) to between 0.5 and 0.55 m.daN (44.24 and 48.67
lbf.in).
(5) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09019) over the nuts (17) and the locating stud and to the mating face
of the brake.
(6) Adjust the relative position of the brake support (19) and the
wing-tip brake (1) with the washers (25) as necessary:
(a) Install a minimum of 1 and a maximum of 3 washers (25) on each
stud.
(b) Install the remaining washers (25) between the brake support (19)
and the nut (23).
(7) Install the brake support (19), the washers (24) and the nuts (23).



EFF :
ALL
 27-51-51


R 
AIJ




Page 413
Feb 01/07

(8) TORQUE the nuts (23) to between 0.5 and 0.55 m.daN (44.24 and 48.67
lbf.in).
(9) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09019) to the shank of the bolt (18), the nuts (23) and the washers
(24).
(10) Install the bolt (18), the washer (20) and the nut (21).
(11) TORQUE the nut (21) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(12) Safety the nut (21) with the cotter pin (22).
(13) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
- the bolt (18) and the washer (20)
- the nut (21) and the cotter pin (22)
- the remaining studs.
(14) Do one of the steps that follow:
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
splines of the universal joint (28).
- or
(b) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
splines of the universal joint (28).
(15) Install the universal joint (28) in the wing-tip brake (1) in a
position where the flange bolt holes are aligned.
(16) If the middle part of the torque shaft was removed, install it
(Ref. TASK 27-54-45-400-008) and (Ref. TASK 27-54-45-400-011).
(17) Install the bolts (26) and the nuts (27).
(18) TORQUE the nuts (27) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).



EFF :
ALL
 27-51-51



AIJ




Page 414
Feb 01/07

(19) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:


- the bolts (26) and the nuts (27)
- the flanges of the universal joint (28) and the torque shaft.
(20) Remove the blanking plugs from the hydraulic lines (13), (16), (29)
and (34).
(21) Make sure that the hydraulic line end-fittings are clean and in the
correct condition.
(22) Connect the hydraulic lines (13), (16), (29) and (34) to the wing-tip
brake (1) and tighten the end fittings.
(23) Remove the blanking caps from the electrical connectors (7) and (10).
(24) Make sure that the electrical connectors (7) and (10) are clean and
in the correct condition.
(25) Connect the electrical connectors (7) and (10) to the wing-tip brake
(1).
(26) Attach the bonding strap (2) to the T-piece (3) with the bolt (4),
the washer (5) and the nut (6) (Ref. TASK 20-28-00-912-004).
Subtask 27-51-51-860-052
D. Aircraft Maintenance Configuration
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shafts
(Ref. TASK 27-50-00-000-003).
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(3) Examine the fluid level in the Green, Yellow and Blue hydraulic
reservoirs. Fill the reservoirs as necessary (Ref. TASK 12-12-29-611001) and (Ref. TASK 12-12-29-611-002).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-51-51-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.



EFF :
ALL
 27-51-51



AIJ




Page 415
Nov 01/08

Subtask 27-51-51-710-050
F. Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Install the safety collar on the circuit breakers 10CV and 12CV.
(2) Pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-863-001), (Ref. TASK 29-10-00-863-002) and (Ref. TASK 29-1000-863-003).
CAUTION : MAKE SURE THE POWER TRANSMISSION SYSTEM IS COMPLETE BEFORE
_______
YOU DO A PREPARATION FOR TEST OR A TEST.
(a) Do an operational test of the wing-tip brake (1) (Ref. TASK 2751-00-710-001).
(3) Examine the wing-tip brake (1) and the related hydraulic connections
for leaks.
(4) Examine the four witness drain holes in the wing-tip brake for leaks.
NOTE : This area is not pressurized during normal operation, so leaks
____
will only show after the operational test.
5. Close-up
________
R

(Ref. Fig. 401/TASK 27-51-51-991-001)


Subtask 27-51-51-410-050
A. Close Access
(1) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(2) Put the No. 3 spoiler in the O (Operation) position (Ref. TASK 2760-00-866-002).
(3) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.



EFF :
ALL
 27-51-51



AIJ




Page 416
Feb 01/07

(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Install the access panels (Ref. TASK 57-51-37-400-004):
FOR 33CV
install 575DB, 575EB
FOR 34CV
install 675DB, 675EB.
Subtask 27-51-51-865-056
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
21CE1, 21CE2, 21CE3, 22CE.
Subtask 27-51-51-942-051
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-51


R 
AIJ




Page 417
Feb 01/07

TASK 27-51-51-000-002
Removal of the Solenoid Valves of the Flap Wing-Tip Brake (WTB)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
98D27604000000

blanking plugs
circuit breaker(s) safety clip(s)
safety barriers
warning notice
warning notices
access platform 3 m (9 ft. 10 in.)
1 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-51-51



AIJ




Page 418
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
27-50-00-866-008
27-60-00-866-002
29-14-00-614-001
27-51-51-991-002
FOR FIN 33CV
29-10-00-864-002
29-10-00-864-003
FOR FIN 34CV
29-10-00-864-001
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Depressurization of the Hydraulic Reservoirs
Fig. 402
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-51-51-991-002)
Subtask 27-51-51-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in the cockpit to tell persons not to
pressurize the hydraulic systems.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-51-51-860-051
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(3) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the


flap/slat control lever.



EFF :
ALL
 27-51-51



AIJ




Page 419
Aug 01/07

R
R

Solenoid valve - Flap WTB


Figure 402/TASK 27-51-51-991-002



EFF :
ALL
 27-51-51



AIJ




Page 420
Feb 01/07

(4) Remove the safety collar from the circuit breakers 10CV and 12CV.
Subtask 27-51-51-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-51-51-864-053
D. Depressurize the Hydraulic Systems
(1) Depressurize the applicable hydraulic systems:
- FOR 33CV
depressurize the Yellow and the Blue hydraulic systems (Ref. TASK
29-10-00-864-002) (Ref. TASK 29-10-00-864-003)
- FOR 34CV
depressurize the Green and the Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-003).
(2) Depressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00614-001):
- FOR 33CV
depressurize the Yellow and the Blue hydraulic reservoirs
- FOR 34CV
depressurize the Green and the Blue hydraulic reservoirs.
Subtask 27-51-51-010-053
E. Get Access
(1) Put the access platform in position:
- for the left wing, below zone 580
- for the right wing, below zone 680.
(2) Remove the access panels:
FOR 33CV
remove 575DB, 575EB
FOR 34CV
remove 675DB, 675EB.



EFF :
ALL
 27-51-51


R 
AIJ




Page 421
Feb 01/07

(3) Put the No. 3 spoiler into the M (Maintenance) position (Ref. TASK
27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-51-51-991-002)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-51-020-051
A. Removal of the Solenoid Valve
(1) Remove the screws (9).
(2) Use one of the screws (9) in the hole (8) to help you to remove the
solenoid valve (7).
(3) Remove the screw (9) from the hole (8).
(4) Remove and discard the O-rings (1), (3), (5) and (6), and the back-up
rings (2) and (4).
(5) Put blanking plugs on the disconnected line ends.



EFF :
ALL
 27-51-51



AIJ




Page 422
Feb 01/07

TASK 27-51-51-400-002
Installation of the Solenoid Valves of the Flap Wing-Tip Brake (WTB)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27604000000

safety barriers
warning notice
warning notices
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 COLLAR-SAFETY, SPOILER

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-51-51



AIJ




Page 423
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R
R
R

1
1
2
3
3
4
5
5
6
6

O-ring
O-ring
back-up ring
O-ring
O-ring
back-up ring
O-ring
O-ring
O-ring
O-ring

27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51

01
01
01
01
01
01
01
01
01
01

-090
-090A
-070
-080
-080A
-060
-040
-040A
-050
-050A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
24-41-00-861-002
27-50-00-866-008
27-50-00-866-009
27-51-00-710-001
27-60-00-866-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Energize the Aircraft Electrical Circuits from the
External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Wing Tip Brake and the
Pressure Off Brake
Extension-Retraction of the Spoilers for Maintenance



EFF :
ALL
 27-51-51



AIJ




Page 424
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-14-00-614-001
29-14-00-614-002
R
R

27-51-51-991-001
27-51-51-991-002
FOR FIN 33CV
29-10-00-864-002
29-10-00-864-003
FOR FIN 34CV
29-10-00-864-001
29-10-00-864-003

Pressurize the Green Hydraulic System


Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Fig. 401
Fig. 402
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System

3. __________
Job Set-up
Subtask 27-51-51-941-061
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notices are in the cockpit to tell persons
not to pressurize the hydraulic systems.
(3) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-51-51-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. TASK 24-41-00-861-002).
(2) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(3) Make sure that the safety collar from the circuit breakers 10CV and
12CV are removed.



EFF :
ALL
 27-51-51



AIJ




Page 425
Feb 01/07

(4) Make sure that the applicable hydraulic systems are depressurized:
- FOR 33CV
depressurize the Yellow and the Blue hydraulic systems (Ref. TASK
29-10-00-864-002) (Ref. TASK 29-10-00-864-003)
- FOR 34CV
depressurize the Green and the Blue hydraulic systems (Ref. TASK
29-10-00-864-001) (Ref. TASK 29-10-00-864-003).
(5) Make sure that the applicable hydraulic reservoirs are depressurized
(Ref. TASK 29-14-00-614-001):
- FOR 33CV
depressurize the Yellow and the Blue hydraulic reservoirs
- FOR 34CV
depressurize the Green and the Blue hydraulic reservoirs.
(6) Make sure that the access platform is in position below the
applicable solenoid valve.
(7) Make sure that the access panels are removed:
- for 33CV, panels 575DB, 575EB
- for 34CV, panels 675DB, 675EB.
(8) Make sure that the No. 3 spoiler is in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(9) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-51-51-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07



EFF :
ALL
 27-51-51


R 
AIJ




Page 426
Feb 01/07

4. Procedure
_________
(Ref. Fig. 402/TASK 27-51-51-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-51-51-420-057
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Clean the component interface and/or the adjacent area.


(3) Do an inspection of the component interface and/or the adjacent area.
(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(5) Lubricate the new O-rings (1),(3),(5) and (6),and the back-up rings
(2) and (4), with HYDRAULIC FLUIDS (Material No. 02-003).
(6) Remove the blanking plugs from the solenoid valve (7) and the wing
tip brake.
(7) Apply a thin layer of STORAGE PRESERVATION (Material No. 15-007) at
the interface of the solenoid valve (7) and the manifold.
(8) Apply STORAGE PRESERVATION (Material No. 15-007) to all of the bolts
and nuts.



EFF :
ALL
 27-51-51



AIJ




Page 427
Aug 01/11

Subtask 27-51-51-420-055
B. Installation of the Solenoid Valve
(1) Install the new O-ring (5) and the new O-ring (6) on the solenoid
valve (7).
(2) Install the new back-up ring (4) and the new O-ring (3) on the
solenoid valve (7). Make sure that the curve on the face of the
back-up ring (4) is against the O-ring (3).
(3) Install the new back-up ring (2) and the new O-ring (1) on the
solenoid valve (7). Make sure that the curve on the face of the
back-up ring (2) is against the O-ring (1).
(4) Install the solenoid valve (7) on the wing tip brake.
NOTE : Solenoid valves 903A0000-01 removed from the PCU valve block
____
(Ref. 27-54-53 and 27-84-53) must not be installed on the
wing-tip brake.
(5) Install the screws (9).
(6) TORQUE the screws (9) to between 0.25 and 0.27 m.daN (22.12 and 23.89
lbf.in).
Subtask 27-51-51-860-054
C. Aircraft Maintenance Configuration
(1) Fill the applicable hydraulic reservoirs (Ref. TASK 12-12-29-611-001)
(Ref. TASK 12-12-29-611-002):
(a) FOR 33CV
fill the Yellow and the Blue hydraulic reservoirs
(b) FOR 34CV
fill the Green and the Blue hydraulic reservoirs.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-51-51


R 
AIJ




Page 428
Aug 01/11

Subtask 27-51-51-865-055
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.
Subtask 27-51-51-863-052
E. Aircraft Maintenance Configuration
(1) Install the safety collar on the circuit breakers 10CV and 12CV.
(2) Pressurize the applicable hydraulic reservoirs and systems:
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL
_______
SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A
HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC
SYSTEM.
(a) Pressurize the applicable hydraulic reservoirs (Ref. TASK 29-1400-614-002):
- FOR 33CV
pressurize the Yellow and the Blue hydraulic system reservoirs
- FOR 34CV
pressurize the Green and the Blue hydraulic system reservoirs.
(b) Pressurize the applicable hydraulic systems (Ref. TASK 29-10-00863-001) (Ref. TASK 29-10-00-863-002) (Ref. TASK 29-10-00-863003):
- FOR 33CV
pressurize the Yellow and the Blue hydraulic systems
- FOR 34CV
pressurize the Green and the Blue hydraulic systems.
(3) Examine the solenoid valve (7) and the interface to the wing tip
brake for leaks.



EFF :
ALL
 27-51-51


R 
AIJ




Page 429
Feb 01/07

Subtask 27-51-51-710-052
F. Test
(1) Do an operational test of the flap wing-tip brake (Ref. TASK 27-5100-710-001).
(2) Examine the solenoid valve (7) and the interface to the wing tip
brake for leaks.
5. Close-up
________
(Ref. Fig. 401/TASK 27-51-51-991-001)
Subtask 27-51-51-410-051
A. Close Access
(1) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(2) Put the No. 3 spoiler in the O (Operation) position (Ref. TASK 2760-00-866-002).
(3) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Install the access panels:
FOR 33CV
install 575DB, 575EB
FOR 34CV
install 675DB, 675EB.
R
Subtask 27-51-51-866-055
R

B. Aircraft Configuration
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).



EFF :
ALL
 27-51-51



AIJ




Page 430
Feb 01/09

Subtask 27-51-51-942-055
R

C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-51-51



AIJ




Page 431
Feb 01/09

FLAPS HYDRAULIC ACTUATION AND POWER TRANSMISSION - DESCRIPTION AND OPERATION


____________________________________________________________________________
1. General
_______
A hydromechanical Power Control Unit (PCU) in the fuselage supplies the
mechanical power to the flap transmission system. The PCU has two hydraulic
motors. Each motor has a Pressure-Off Brake (POB) and a valve block, which
is electrically controlled.
Torque shafts and gearboxes transmit the mechanical power from the PCU to
the offset gearboxes of the actuators. The offset gearboxes then transmit
the power through their torque limiters to the rotary actuators, which move
the flap transmission system.
The torque limiters control the transmission of torque from the offset
gearboxes to keep the torque in the specified limits. The torque limiters
prevent the mechanical overload of the rotary actuators.
2. __________________
Component Location
(Ref. Fig. 001, 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------6201CM
POWER CONTROL UNIT
147 734
27-54-51
6202CM
TORQUE SHAFT ASSY-TRANSMISSION
147 734
27-54-45
6203CM
GEARBOX-RIGHT ANGLE
147 734
27-54-41
6204CM
TORQUE SHAFT ASSY-TRANSMISSION
147 734
27-54-45
6205CM
ACTUATOR ASSY
147 734
27-54-49
6206CM
TORQUE SHAFT ASSY-TRANSMISSION
572 571AB
27-54-45
6207CM
STEADY BEARING ASSY
572 571AB
27-54-44
6208CM
TORQUE SHAFT ASSY-TRANSMISSION
572 571AB
27-54-45
6209CM
LINE GEARBOX
574 573AB
27-54-47
6210CM
TORQUE SHAFT ASSY-TRANSMISSION
574 573AB
27-54-45
6211CM
ACTUATOR ASSY
574 571AB
27-54-49
6212CM
TORQUE SHAFT ASSY-TRANSMISSION
574 573AB
27-54-45
6213CM
STEADY BEARING ASSY
574 573BB
27-54-44
6214CM
TORQUE SHAFT ASSY-TRANSMISSION
574 573BB
27-54-45
6215CM
STEADY BEARING ASSY
574 573CB
27-54-44
6216CM
TORQUE SHAFT ASSY-TRANSMISSION
574 573CB
27-54-45
6217CM
BEVEL GEARBOX
575 573CB
27-54-48
6218CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575AB
27-54-45
6219CM
STEADY BEARING ASSY
575 575BB
27-54-44
6220CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575BB
27-54-45
6221CM
ACTUATOR ASSY
575 573BB
27-54-49



EFF :
ALL
 27-54-00



AIJ




Page 1
Feb 01/07

Flap System - Component Location


Figure 001


EFF :
ALL
 27-54-00



AIJ




Page 2
Feb 01/07

Steady Bearings and Torque Shafts - Component Location


Figure 002


EFF :
ALL
 27-54-00



AIJ




Page 3
Feb 01/07

------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------6222CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575CB
27-54-45
6223CM
STEADY BEARING ASSY
575 575DB
27-54-44
6224CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575DB
27-54-45
6225CM
STEADY BEARING ASSY
575 575DB
27-54-44
6226CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575DB
27-54-45
6228CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575DB
27-54-45
6229CM
STEADY BEARING ASSY
575 575EB
27-54-44
6230CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575EB
27-54-45
6231CM
STEADY BEARING ASSY
575 575FB
27-54-44
6232CM
TORQUE SHAFT ASSY-TRANSMISSION
575 575FB
27-54-45
6233CM
ACTUATOR ASSY
575 573BB
27-54-49
6252CM
TORQUE SHAFT ASSY-TRANSMISSION
148 744
27-54-45
6253CM
GEARBOX-RIGHT ANGLE
148 744
27-54-41
6254CM
TORQUE SHAFT ASSY-TRANSMISSION
148 744
27-54-45
6255CM
ACTUATOR ASSY
148 744
27-54-49
6256CM
TORQUE SHAFT ASSY-TRANSMISSION
672 671AB
27-54-45
6257CM
STEADY BEARING ASSY
672 671AB
27-54-44
6258CM
TORQUE SHAFT ASSY-TRANSMISSION
672 671AB
27-54-45
6259CM
LINE GEARBOX
674 673AB
27-54-47
6260CM
TORQUE SHAFT ASSY-TRANSMISSION
674 673AB
27-54-45
6261CM
ACTUATOR ASSY
674 671AB
27-54-49
6262CM
TORQUE SHAFT ASSY-TRANSMISSION
674 673BB
27-54-45
6263CM
STEADY BEARING ASSY
674 673BB
27-54-44
6264CM
TORQUE SHAFT ASSY-TRANSMISSION
674 673BB
27-54-45
6265CM
STEADY BEARING ASSY
674 673CB
27-54-44
6266CM
TORQUE SHAFT ASSY-TRANSMISSION
674 673CB
27-54-45
6267CM
BEVEL GEARBOX
675 673CB
27-54-48
6268CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675AB
27-54-45
6269CM
STEADY BEARING ASSY
675 675BB
27-54-44
6270CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675BB
27-54-45
6271CM
ACTUATOR ASSY
675 673BB
27-54-49
6272CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675CB
27-54-45
6273CM
STEADY BEARING ASSY
675 675CB
27-54-44
6274CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675DB
27-54-45
6275CM
STEADY BEARING ASSY
675 675DB
27-54-44
6276CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675DB
27-54-45
6278CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675DB
27-54-45
6279CM
STEADY BEARING ASSY
675 675EB
27-54-44
6280CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675EB
27-54-45
6281CM
STEADY BEARING ASSY
675 675FB
27-54-44
6282CM
TORQUE SHAFT ASSY-TRANSMISSION
675 675FG
27-54-45
6283CM
ACTUATOR ASSY
675 673BB
27-54-49



EFF :
ALL
 27-54-00



AIJ




Page 4
Feb 01/07

3. __________________
System Description
(Ref. Fig. 003)
A. Hydraulic Actuation
Two of the three hydraulic systems supply fluid pressure through a
priority valve to the PCU:
- the GREEN hydraulic system supplies valve block 23CV
- the YELLOW hydraulic system supplies valve block 24CV
- the priority valves are set when the pressure drops below 140 bar (2030
psi).
Each valve block controls the flow of hydraulic fluid to the related
hydraulic motor and its POB.
Each POB stops and holds the output shaft of the related hydraulic motor
when:
- the solenoids of the related valve block are de-energized because of a
normal PCU shutdown sequence
- there is not enough pressure in the related hydraulic system
- one of the failures given in (Ref. 27-51-00) occurs.
A differential gearbox connects the output shafts of the hydraulic motors
and transmits their torque to the power transmission system. If a POB
engages and holds its motor, the remaining motor moves the transmission
system at half speed but at full torque.
B. Power Transmission
(Ref. Fig. 001, 004, 005)
In each wing, the transmission system includes:
- torque shafts
- a right angle gearbox at the wing root. This changes the drive
alignment through 90 degrees for input to the track 1 actuator
- a line gearbox. This moves the drive path forward onto the rear face of
the false rear spar
- a 19 degree bevel gearbox. This puts the drive into line with the rear
spar
- four actuators. Each actuator consists of an offset gearbox, a torque
limiter and a plug-in rotary actuator
- a Wing Tip Brake (WTB)
- An Asymmetry Position Pick-Off Unit (APPU).
The torque shafts transmit power from the PCU to the gearboxes and
actuators. Universal joints connect the torque shafts and steady bearings
support them.



EFF :
ALL
 27-54-00



AIJ




Page 5
Feb 01/07

PCU Hydraulic System - Schematic


Figure 003


EFF :
ALL
 27-54-00



AIJ




Page 6
Feb 01/07

Actuator - Typical Installation


Figure 004


EFF :
ALL
 27-54-00



AIJ




Page 7
Feb 01/07

Flap and Flap Track Fairing - Operation


Figure 005


EFF :
ALL
 27-54-00



AIJ




Page 8
Feb 01/07

Each input gearbox has a torque limiter which operates in both


directions. Each torque limiter has a lock-out torque value set as
necessary for its location. The torque limiters protect the wing
structure and the actuators from a torque overload which could occur by a
flap mechanism failure. A mechanical indicator on each actuator latches
if a lock-out occurs. You can set the indicator again when the aircraft
is on the ground.
Drive levers on the actuator output shafts move the flaps through flap
link arms. Bolts attach the flap link arms to the flap bottom surface.
To prevent extension or retraction overtravel each drive lever has
mechanical stops. Engagement of the stops does not occur at a time of
normal operation.
Wing Tip Brakes (WTB) give asymmetry and runaway protection (Ref.
27-51-00).
The offset gearbox of the track 4 actuator drives an Asymmetry Position
Pick-off Unit (APPU) (Ref. 27-51-00).
Carriages, which roll freely on staight tracks, hold each flap. Track
installation is on beams below the wing. Vertical-load rollers and
side-load rollers keep the carriages on the tracks. Each carriage has a
containment device to hold it on the track if a failure occurs.
The carriages, tracks and beams at tracks 2, 3 and 4 are made almost the
same. Attached to the fuselage is track 1, which uses a different
configuration as that at tracks 2, 3 or 4. Attached to the flap bottom
surface at tracks 2, 3 and 4 are brackets. Connected to the brackets is a
linkage which operates the hinged part of the track fairing during flap
extension and retraction.
At the end of each track are mechanical stops. The stops prevent
retraction overtravel and makes sure that the flap do not disengage at
the end of flap extension. Engagement of the stops does not occur at a
time of normal operation.
4. ____________
Power Supply
Not Applicable
5. Interface
_________
Not Applicable



EFF :
ALL
 27-54-00


R 
AIJ




Page 9
Feb 01/07

6. _____________________
Component Description
(Ref. Fig. 006, 007)
R
R

A. Power Control Unit

R
R
R
R
R
R
R
R
R
R
R
R
R
R

(1) Description
The flap PCU is a hydro-mechanical unit. The main body, which is a
case, contains a differential gearbox.
The Line Replaceable Units (LRUs) of the PCU are as follows:
- two hydraulic motors
- two Pressure-Off Brakes (POB)
- two valve blocks
- six solenoid valves
- two inlet filters
- one Feedback Position Pick-off Unit (FPPU)
- one Instrumentation Position Pick-off Unit (IPPU).

R
R
R
R
R
R
R
R
R
R
R
R
R

(a) Hydraulic Motor

R
R
R
R
R
R
R
R
R
R
R

(b) Pressure-Off Brake (POB)

(Ref. Fig. 008)


Each multi-piston hydraulic motor receives hydraulic pressure
from a valve block. The output shaft of the motor is connected to
a POB. Hydraulic fluid lubricates the motor. The cylinders of the
motor are connected to two ports, referred to as the extend and
retract ports.
When the valve block supplies hydraulic fluid to the extend port,
the motor moves in the direction necessary to extend the flaps.
When hydraulic pressure is supplied to the retract port, the
motor moves in the opposite direction and the flaps retract.

(Ref. Fig. 009)


A POB is attached to each hydraulic motor. It holds the output
shaft of the hydraulic motor when:
- the hydraulic motors do not operate
- the related hydraulic system does not supply sufficient
hydraulic power
- the WTB stops the flap transmission system because of some
system failures.



EFF :
ALL
 27-54-00



AIJ




Page 10
Nov 01/10

Power Control Unit


Figure 006


EFF :
ALL
 27-54-00



AIJ




Page 11
Feb 01/07

Power Control Unit - Schematic


Figure 007


EFF :
ALL
 27-54-00



AIJ




Page 12
Feb 01/07

Hydraulic Motor
Figure 008


EFF :
ALL
 27-54-00



AIJ




Page 13
Feb 01/07

Pressure-Off Brake
Figure 009


EFF :
ALL
 27-54-00



AIJ




Page 14
Feb 01/07

R
R
R
R
R
R
R
R

The POB has a multiple friction-disk pack. Splines connect the


stators to the POB casing and the rotors to the shaft in the
center of the POB. Springs hold the friction disks together. When
hydraulic pressure is applied to the POB, the friction disks are
disengaged (against the pressure of the springs).
To remove the POB, you must remove the related hydraulic motor
first.
(c) Valve Block
(Ref. Fig. 010)
The flap PCU has two valve blocks which are electrically
controlled. Each valve block controls the flow of hydraulic fluid
to its related hydraulic motor and POB.
The Linear Variable Differential Transducer (LVDT) is installed
on one end of the valve block. The LVDT supplies a signal to the
SFCC so that the SFCC can monitor the position of the control
valve spool. Installed on the valve block opposite the LVDT are
two directional solenoid valves and one POB solenoid valve. The
directional solenoid valves operate as the extend or the retract
solenoid valves. The POB solenoid valve operates as the brake
solenoid valve.
The valve blocks are interchangeable with those fitted to the
slat PCU. Removal of the valve blocks is possible without the
removal of the PCU from the aircraft.
The primary components of a valve block are:
- a main control valve
- an inlet filter
- five restrictors
- two check valves
- a pressure port
- a return port
- an electrical connector.

R
R
R
R
R
R
R
R

(d) Solenoid Valve


(Ref. Fig. 010)
The solenoid valves of the PCU are the same and interchangeable
with each other and those on the WTB. Their removal is possible
without the removal of the valve blocks from the PCU.



EFF :
ALL
 27-54-00



AIJ




Page 15
Nov 01/10

Valve Block
Figure 010


EFF :
ALL
 27-54-00



AIJ




Page 16
Feb 01/07

R
R
R
R
R

(e) Filter

R
R
R
R
R
R
R
R
R
R
R

(f) Differential Gearbox

R
R
R
R
R
R
R
R
R
R
R
R
R

(g) Position Pick-Off Units

The inlet filter is installed at the pressure port. Its removal


is possible without the removal of the valve block from the PCU.

The differential gearbox contains a reduction and differential


gear. The reduction and differential gear transmits the movement
from the hydraulic motors through the PCU output bevel gear to
the flap transmission system. The casing of the differential
gearbox also contains the intermediate gear which transmits the
movement to the IPPU and the FPPU. On the differential gearbox
casing are primary and secondary load points for the attachment
of the PCU to the aircraft structure.

Two PPUs are installed in the flap PCU:


- the Instrumentation PPU (IPPU) (Ref. 27-55-00)
- the Feedback PPU (FPPU) (Ref. 27-51-00).
They are the same as the Asymmetry PPU (APPU) (Ref. 27-51-00)
installed in the transmission system at each wing tip. All PPUs
are interchangeable.
An intermediate gear transmits the movement from the differential
gearbox to the IPPU and the FPPU.
Removal of the PPUs is possible without the removal of the PCU
from the aircraft.
(2) Operation
The Slat/Flap Control Computers (SFCC 1 and SFCC 2) (Ref. 27-51-00)
control the PCU solenoid valves. The SFCC 1 controls and monitors
(through the valve block) the operation of the motor 1 and the SFCC 2
does the same for the motor 2.
The POB,
pressure
- to the
- to the

extend and retract solenoid valves, when energized, permit


fluid flow:
POB
chambers at each end of the control valve.

When the spool of the control valve moves away from the neutral
position, the hydraulic system of the aircraft is connected to the
related motor as follows:
- the direction in which the valve spool moves controls the direction
in which the motor turns
- the distance that the valve spool moves controls the speed at which
the motor turns.


EFF :
ALL
 27-54-00



AIJ




Page 17
Nov 01/10

During normal operation, the valve blocks and the motors operate at
the same time. They operate at the same time in the static mode, the
normal startup sequence and the normal shutdown sequence. Other
sequences operate when there is a system failure or if the startup
sequence occurs near to the commanded position.
(a) Static Mode
(Ref. Fig. 011)
In the static mode:
- there is no electrical power at all three solenoid valves
- the centering effect of the springs holds the control valve
spool in the neutral position
- the lands on the valve spool seal the main pressure and return
lines
- the chambers at each end of the valve and the line to the POB
are open to return. The return is through the solenoid valves.
(b) Normal Startup Sequence
(Ref. Fig. 012)
During the normal startup sequence:
- the SFCC energizes one of the directional (extend or retract)
solenoid valves
- the applicable end of the control valve gets fluid pressure
- the valve spool moves in response to the increased fluid
pressure at its applicable end
- the LVDT sends a signal to the SFCC to indicate a movement of
the valve spool
- the movement of the valve spool causes the POB solenoid valve
to get fluid pressure
- when the valve spool reaches the pressure on point, the SFCC
energizes the POB solenoid valve to release the POB
- the hydraulic motor receives fluid flow and starts to turn the
transmission
- with the valve spool fully moved, the motor gets the maximum
available fluid flow and turns at full speed.
(c) Normal Shutdown Sequence
(Ref. Fig. 013)



EFF :
ALL
 27-54-00


R 
AIJ




Page 18
Nov 01/10

PCU Operation - Static Mode


Figure 011


EFF :
ALL
 27-54-00



AIJ




Page 19
Feb 01/07

PCU Operation - Normal Startup Sequence


Figure 012


EFF :
ALL
 27-54-00



AIJ




Page 20
Feb 01/07

PCU Operation - Normal Shutdown Sequence


Figure 013


EFF :
ALL
 27-54-00


R 
AIJ




Page 21
Feb 01/07

During the normal shutdown sequence:


- electrical power is removed from the drive-direction solenoid
when the flaps are 6.69 deg. (FPPU) away from the set position.
- the opposite direction solenoid is energized at this time.
- full hydraulic system pressure moves the spool towards the
center position. Restrictors control the speed of this movement
of the spool.
- the drive-direction solenoid is now energized again when the
spool gets to the Low Speed operation position. Spring
pressure now moves the spool, at a slower speed, towards the
center position. A restriction of hydraulic fluid into the
pressure-line upstream of the solenoid valve now controls the
speed of movement of the spool.
- the motor now operates at Low Speed because of the decreased
size of the pressure and pressure-return connections.
- electrical power is removed from the drive-direction solenoid
and the POB solenoid valve when the flaps are 0.177 deg. (FPPU)
away from the set position.
- when the LVDT indicates that the valve spool is 1.5 mm from the
center position the SFCC removes power from the opposite
direction solenoid valve.
- the valve spool moves to the center position and stops.
(d) Pressure Maintaining Function
Emergency or stand-by hydraulic power has a limited flow
capacity. At a time of operation with emergency or stand-by
hydraulic power, it is necessary to prevent a sudden decrease in
supply pressure.
A sudden decrease in supply pressure can occur because of too
much demand by the flap system. This could cause an application
of the POB at any time.
The force and the rate of the spring, together with the port
area/valve movement property, give the function that maintains
the pressure of the valve.
As the supply pressure decreases, the valve closes slowly. This
reduces the flow rate to the motor and thus the work-load on the
pump. This prevents the work-load of the slat/flap system to
cause a sudden decrease of the supply pressure.
(e) Single System Operation
The loss of the hydraulic pressure to one of the two motors
causes the POB to apply and hold the motor output shaft. This
locks one half of the differential gearbox. The serviceable motor



EFF :
ALL
 27-54-00


R 
AIJ




Page 22
Feb 01/07

then gives sufficient output torque at half speed, at the gearbox


output shaft.
B. Right Angle Gearbox 6203CM(6253CM)
(Ref. Fig. 014)
A right-angle gearbox is installed in each wing. Their gear ratio is 1:1.
Bolts attach each right-angle gearbox to the structure.
The input and output shafts have splined ends for connection to the
torque shafts of the transmission system. The input and output shafts
have reversed lip seals which make sure that unwanted material does not
get into the gearbox. The gearbox is filled with grease. There are
inspection plugs through which you can examine the lubricant.
C. Line Gearbox 6209CM(6259CM)
(Ref. Fig. 015)
The line gearbox has a ratio of 1:1. Bearings, seals and the procedures
for lubrication and inspection are almost the same as those used on the
right angle gearbox.
D. Bevel Gearbox 6217CM(6267CM)
(Ref. Fig. 016)
The bevel gearbox has a ratio of 1:1. Bearings, seals and the procedures
for lubrication and inspection are almost the same as those used on the
right angle gearbox.
E. Torque Shafts and Steady Bearings
(Ref. Fig. 017, 018)
Each torque shaft is a splined/bolted assembly which has, as applicable:
- universal joints
- flexible joints
- a plunging joint.



EFF :
ALL
 27-54-00


R 
AIJ




Page 23
Feb 01/07

Right Angle Gearbox


Figure 014


EFF :
ALL
 27-54-00



AIJ




Page 24
Feb 01/07

Line Gearbox
Figure 015


EFF :
ALL
 27-54-00



AIJ




Page 25
Feb 01/07

Bevel Gearbox
Figure 016


EFF :
ALL
 27-54-00



AIJ




Page 26
Feb 01/07

Torque Shafts and Steady Bearings


Figure 017


EFF :
ALL
 27-54-00



AIJ




Page 27
Feb 01/07

Torque Shafts and Steady Bearings - Details


Figure 018


EFF :
ALL
 27-54-00



AIJ




Page 28
Feb 01/07

Universal joints have two forkends connected with a cruciform bearing and
can have splined connections or flanged connections. Flanged connections
are bolted to flanges on the mating torque shaft and the splined
connections connect with mating splines. Splined connections can be one
of two types, the movable type (M), or the fixed type (F). Movable
joints are free to move along the splines. Fixed joints have a pin
installed to stop any movement. The pins are held in position with a
spring clip.
Universal joints let the torque shafts have large angular changes of
alignment as they turn.
The flexible joint is an articulating spline-joint assembly that has a
male splined coupling and a female splined coupling. The couplings are
connected together with a swaged retainer to make a movable joint. The
flexible joints let the torque shafts have small angular changes of
alignment as they turn.
The plunging joint has a universal joint which moves on splines inside a
short drive shaft. The plunging joint gives a flexible joint:
- on the output side of the flap 1 actuator
- on the input side of the line gearbox.
Each torque shaft assembly has at least one movable end connection. The
movable end connection has an indicator groove. This goes out of view
when the splines at the connection are correctly engaged.
Steady bearings, which hold the torque shafts, are attached to the
structure with bolts. Two types of steady bearing are installed:
- a self-aligning ball bearing only
- a self-aligning ball bearing and univeral joint assembly.
F. Actuator Track 1 6205CM(6255CM)
(Ref. Fig. 019)
The actuator is an assembly that has:
- an offset gearbox
- a rotary actuator.
R
R
R
R
R

(1) Offset Gearbox - Track 1


(Ref. Fig. 020)
The offset gearbox has:
- an actuator housing



EFF :
ALL
 27-54-00



AIJ




Page 29
Nov 01/10

Actuator - Track 1
Figure 019


EFF :
ALL
 27-54-00



AIJ




Page 30
Feb 01/07

Offset Gearbox
Figure 020


EFF :
ALL
 27-54-00



AIJ




Page 31
Feb 01/07

- a gear cover
- a bevel housing
- a torque limiter.
The actuator housing is a machined casting which contains the rotary
actuator and the torque limiter. The gear cover is bolted to the
actuator housing and seals the input side of the actuator.
The bevel housing is bolted to the gear cover and contains an input
bevel gear. This engages with a bevel gear shaft that passes through
the torque limiter to transmit the output drive to the flap drive
system. An input gear is installed on the bevel gear shaft. The input
gear engages with an idler gear installed between the input gear and
a gear wheel assembly. This gear wheel assembly engages with, and
transmits the drive to, the input gear of the rotary actuator.
The input bevel gear is held by one ball bearing and one taper roller
bearing. Two roller bearings hold the bevel gear shaft.
The actuator assembly (offset gearbox and rotary actuator) is
lubricated with semi-fluid grease and is filled through a vent plug
in the bevel housing.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

(2) Torque Limiter - Track 1


(Ref. Fig. 020)
The torque limiter prevents a torque-overload if there is a
malfunction in the flap drive system. The torque limiter has:
- a ball ramp device
- five earthed plates
- six friction discs
- two groups of six spring discs
- a thrust cup
- a lockout indicator.
The ball ramp device gives axial movement of the input gear when the
input gear turns at a lower speed than the bevel gear shaft. The
device is a coupling made by three balls. These are installed between
the input gear and the bevel gear shaft in machined grooves (ramps).
The earthed plates and the friction discs are installed on the input
gear. The spring discs and the thrust cup are installed on the bevel
gear shaft.



EFF :
ALL
 27-54-00



AIJ




Page 32
Nov 01/10

R
R
R
R

The lockout indicator gives a visual indication that the torque


limiter has operated. It has a lockout indicator arm and a plunger.
These are operated by movement of the thrust cup.
(a) Operation
Input from the torque shaft is transmitted from the input bevel
gear to turn the bevel gear shaft and the input gear through the
ball ramp device. Output from the bevel gear shaft is transmitted
through torque shafts to the line gearbox. Output from the input
gear is transmmitted through the idler gear and the gear wheel
assembly to the rotary acuator.
During usual operation, the bevel gear shaft, the input gear and
the friction discs turn at the same speed. If the torque reaction
at the rotary actuator is too high, it causes the input gear to
turn more slowly than the bevel gear shaft. This difference in
speed causes the input gear to move the balls up the ramps in the
bevel gear shaft and the input gear. When this occurs, the input
gear moves against the pressure of the spring discs. This
compresses the friction discs against the earthed plates and
causes the unit to lockout.
When the torque limiter is compressed, the thrust cup moves
against the pressure of the spring discs. The thrust cup touches
the plunger which extends the lockout indicator arm. This gives a
visual indication that the torque limiter has operated. The
indicator arm stays extended until it is pushed in manually to
cancel the indication.
The system can be set again by operation in the opposite
direction.

R
R
R
R
R
R

(3) Rotary Actuator - Track 1


(Ref. Fig. 021)
The rotary actuator is held in the actuator housing of the offset
gearbox with two countersunk screws. It is a reduction unit that
gives a high torque/low speed output and has:
- an input end-cover
- an input gear (first stage sun gear)
- a short-flanged hub assembly which has a short-flanged hub and a
rotating ring gear
- first-stage planet gears (three)



EFF :
ALL
 27-54-00



AIJ




Page 33
Nov 01/10

Rotary Actuator - Typical


Figure 021


EFF :
ALL
 27-54-00



AIJ




Page 34
Feb 01/07

an annulus gear assembly


power-stage planet gears (six)
a fixed ring gear
a long-flanged hub assembly which has a long-flanged hub and an
output ring gear
- an output shaft
- an output end-cover.
The input gear and first stage planet gears are installed in bearings
in the1 input end-cover and the short-flanged hub assembly. The
annulus gear and power-stage planet gears are installed inside the
ring gear, between the short-flanged hub and the long-flanged hub
assemblies.
Each planet gear has three gears, front, center and rear. The rear
gear teeth on the first-stage planet gears engage with the annulus
gear. The annulus gear and the rotating ring gear engage with the
front gear teeth on the power-stage planet gears. The center gear
teeth of the power-stage planet gears engage with fixed ring gear.
The rear gear teeth engage with the teeth of the output ring gear.
The output shaft goes through the output end-cover and is splined
into the flanged hub assemblies. A retaining plate is attached to the
output shaft to keep the output shaft and the input gear in position.
The output shaft is connected to the flap drive lever.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

(a) Operation
Input from the offset gear box is transmitted through the input
gear to first-stage planet gears. The first-stage planet gears
turn and transmit the input through the annulus gear assembly to
the power-stage planet gears.
The power-stage planet gears engage with the fixed ring gear, the
output ring gear and the rotating ring gear. As the fixed ring
gear is attached to the wing, the power stage planet gears turn
and move around the fixed ring gear. As a result the output ring
gear and the rotating ring gear turn. This transmits output
through the flanged hubs and the output shaft to the flap drive
lever.
G. Actuator Track 2 6211CM(6261CM)
(Ref. Fig. 022, 023)
The actuator is an assembly that has:
- an offset gearbox
- a rotary actuator.



EFF :
ALL
 27-54-00



AIJ




Page 35
Nov 01/10

Actuator - Track 2
Figure 022


EFF :
ALL
 27-54-00


R 
AIJ




Page 36
Feb 01/07

Offset Gearbox - Track 2


Figure 023


EFF :
ALL
 27-54-00


R 
AIJ




Page 37
Feb 01/07

(1) Offset Gearbox - Track 2


The offset gearbox has:
- an actuator housing
- a torque limiter housing
- a torque limiter.
The actuator housing is a machined casting which contains the rotary
actuator.
The torque limiter housing is bolted to the actuator housing. It
contains an input shaft, the torque limiter and the input gears.
An input gear on the input shaft engages with an idler gear installed
between the input gear and a gear wheel assembly. This gear wheel
assembly engages with, and transmits the drive to, the input gear of
the rotary actuator. Two roller bearings hold the input shaft in the
torque limiter housing.
The actuator assembly (offset gearbox and rotary actuator) is
lubricated with semi-fluid grease and is filled through a vent plug
in the actuator housing.
(2) Torque Limiter - Track 2
The torque limiter prevents a torque-overload if there is a
malfunction in the flap drive system. The torque limiter has:
- a ball ramp device
- five earthed plates
- six friction discs
- a group of eight spring discs
- a thrust cup
- a group of six spring discs
- a lockout indicator.
The ball ramp device gives axial movement of the input gear when the
input gear turns at a lower speed than the input shaft. The device is
a coupling made by three balls. These are installed between the input
gear and the input shaft in machined grooves (ramps).
The earthed plates and the friction discs are installed on the input
gear. The spring discs and the thrust cup are installed on the input
shaft.
The lockout indicator gives a visual indication that the torque
limiter has operated. It has a lockout indicator arm and a plunger.
These are operated by movement of the thrust cup.



EFF :
ALL
 27-54-00


R 
AIJ




Page 38
Feb 01/07

(a) Operation
Input from the torque shaft is transmitted by the input shaft to
turn the input gear through the ball ramp device.
Output from the input gear is transmmitted through the idler gear
and the gear wheel assembly to the rotary actuator.
Output from the input shaft is transmitted by torque shafts,
through the bevel gearbox, to the actuator at track 3.
During usual operation, the input shaft, the input gear and the
friction discs turn at the same speed. If the torque reaction at
the rotary actuator is too high, it causes the input gear to turn
more slowly than the input shaft. This difference in speed causes
the input gear to move the balls up the ramps in the input shaft
and the input gear. When this occurs, the input gear moves
against the pressure of the spring discs. This compresses the
friction discs against the earthed plates and causes the unit to
lockout.
When the torque limiter is compressed, the thrust cup moves
against the pressure of the spring discs. The thrust cup touches
the plunger which extends the lockout indicator arm. This gives a
visual indication that the torque limiter has operated. The
indicator arm stays extended until it is pushed in manually to
cancel the indication.
The system can be set again by operation in the opposite
direction.
(3) Rotary Actuator - Track 2
(Ref. Fig. 021)
The description and operation for the track 2 rotary actuator is the
same as that for the rotary actuator at track 1.
H. Actuator Track 3 6221CM(6271CM)
(Ref. Fig. 024, 025)
The actuator is an assembly that has:
- an offset gearbox
- a rotary actuator.



EFF :
ALL
 27-54-00


R 
AIJ




Page 39
Feb 01/07

Actuator - Track 3
Figure 024


EFF :
ALL
 27-54-00


R 
AIJ




Page 40
Feb 01/07

Offset Gearbox - Track 3


Figure 025


EFF :
ALL
 27-54-00


R 
AIJ




Page 41
Feb 01/07

(1) Offset Gearbox - Track 3


The offset gearbox has:
- an actuator housing
- a gear housing
- a bevel gearbox
- a torque limiter housing
- a torque limiter.
The actuator housing is a machined casting which contains the rotary
actuator.
The gear housing is bolted to the actuator housing and contains a
bevel gear assembly and a pinion shaft. The pinion shaft is splined
and has a bevel pinion at each end. At one end the bevel pinion
engages with the bevel gear assembly in the gear housing. At the
other, the pinion engages with a bevel gear in the bevel gearbox. The
bevel gearbox is bolted to the gear housing.
The torque limiter housing contains an input shaft and a torque
limiter and is bolted to the bevel gearbox. The input shaft connects
to the bevel gear in the bevel gearbox. Drive is transmitted from the
input shaft to the bevel gear through six drive-balls.
The torque limiter housing can be installed in one of two positions.
One position is for a LH wing configuration, the other is for a RH
wing configuration.
The actuator assembly (offset gearbox and rotary actuator) is
lubricated with semi-fluid grease and is filled through a vent plug
in the actuator housing.
(2) Torque Limiter - Track 3
The torque limiter prevents a torque-overload if there is a
malfunction in the flap drive system. The torque limiter has:
- a ball ramp device
- five earthed plates
- six friction discs
- a group of eight spring discs
- a thrust cup
- a group of six spring discs
- a lockout indicator.
The ball ramp device gives axial movement of the hub when the bevel
gear turns at a lower speed than the input shaft. The device is a



EFF :
ALL
 27-54-00


R 
AIJ




Page 42
Feb 01/07

coupling made by three balls. These are installed between the hub and
the input shaft in machined grooves (ramps).
The earthed plates and the friction discs are installed on the hub.
The spring discs and the thrust cup are installed on the input shaft.
The lockout indicator gives a visual indication that the torque
limiter has operated. It has a lockout indicator arm and a plunger.
These are operated by movement of the thrust cup.
(a) Operation
Input from the torque shaft is transmitted through the input
shaft to turn the bevel gear through the ball ramp device.
Output from the bevel gear turns the pinion shaft which operates
the bevel gear assembly and the rotary actuator.
Output from the input drive shaft is transmitted through torque
shafts to the actuator at track 4.
During usual operation, the input shaft, the hub, the bevel gear
and the friction discs turn at the same speed. If the torque
reaction at the rotary actuator is too high, it causes the bevel
gear to turn more slowly than the input shaft. This difference in
speed causes the hub to move the balls up the ramps in the input
shaft and the hub. When this occurs, the hub moves against the
pressure of the spring discs. This compresses the friction discs
against the earthed plates and causes the unit to lockout.
When the torque limiter is compressed, the thrust cup moves
against the pressure of the spring discs. The thrust cup touches
the plunger which extends the lockout indicator arm. This gives a
visual indication that the torque limiter has operated. The
indicator arm stays extended until it is pushed in manually to
cancel the indication.
The system can be set again by operation in the opposite
direction.
(3) Rotary Actuator - Track 3
(Ref. Fig. 021)
The description and operation for the track 3 rotary actuator is the
same as that for the rotary actuator at track 1.



EFF :
ALL
 27-54-00


R 
AIJ




Page 43
Feb 01/07

J. Actuator Track 4 6233CM(6283CM)


(Ref. Fig. 004, 026)
The actuator is an assembly that has:
- an offset gearbox
- a rotary actuator.
(1) Offset Gearbox - Track 4
The offset gearbox has:
- an actuator housing
- a gear housing
- a bevel gearbox
- a torque limiter housing
- a torque limiter.
The actuator housing is a machined casting which contains the rotary
actuator.
The gear housing is bolted to the actuator housing and contains a
bevel gear assembly and a pinion shaft. The bevel gear assembly
includes a spur gear which engages with a spur pinion. This has a
quill drive that engages with the input shaft of the Assymetry
Position Pick-off Unit (APPU). The pinion shaft is splined with a
bevel pinion at each end. At one end the bevel pinion engages with
the bevel gear assembly in the gear housing. At the other, the pinion
engages with a bevel gear in the bevel gearbox. The bevel gearbox is
bolted to the gear housing.
The torque limiter housing contains an input shaft and a torque
limiter and is bolted to the bevel gearbox. The input shaft connects
to the bevel gear in the bevel gearbox. Drive is transmitted from the
input shaft to the bevel gear through six drive-balls.
The torque limiter housing can be installed in one of two positions.
One position is for a LH wing configuration, the other is for a RH
wing configuration.
The actuator assembly (offset gearbox and rotary actuator) is
lubricated with semi-fluid grease and is filled through a vent plug
in the actuator housing.



EFF :
ALL
 27-54-00


R 
AIJ




Page 44
Feb 01/07

Offset Gearbox - Track 4


Figure 026


EFF :
ALL
 27-54-00



AIJ




Page 45
Feb 01/07

(2) Torque Limiter - Track 4


The torque limiter prevents a torque-overload if there is a
malfunction in the flap drive system. The torque limiter has:
- a ball ramp device
- five earthed plates
- six friction discs
- two groups of six spring discs
- a thrust cup
- a lockout indicator.
The ball ramp device gives axial movement of the hub when the bevel
gear turns at a lower speed than the input drive shaft. The device is
a coupling made by three balls. These are installed between the hub
and the input shaft in machined grooves (ramps).
The earthed plates and the friction discs are installed on the hub.
The spring discs and the thrust cup are installed on the input shaft.
The lockout indicator gives a visual indication that the torque
limiter has operated. It has a lockout indicator arm and a plunger.
These are operated by movement of the thrust cup.
(a) Operation
Input from the torque shaft is transmitted from the input shaft
to turn the bevel gear through the ball ramp device.
Output from the bevel gear turns the pinion shaft which operates
the bevel gear assembly and the rotary actuator. The spur gear on
the bevel gear assembly transmits an input through the spur
pinion and the quill drive to the APPU.
During usual operation, the input shaft, the hub, the bevel gear
and the friction discs turn at the same speed. If the torque
reaction at the rotary actuator is too high, it causes the bevel
gear to turn more slowly than the input shaft. This difference in
speed causes the hub to move the balls up the ramps in the input
shaft and the hub. When this occurs, the hub moves against the
pressure of the spring discs. This compresses the friction discs
against the earthed plates and causes the unit to lockout.
When the torque limiter is compressed, the thrust cup moves
against the pressure of the spring discs. The thrust cup touches
the plunger which extends the lockout indicator arm. This gives a
visual indication that the torque limiter has operated. The
indicator arm stays extended until it is pushed in manually to
cancel the indication.



EFF :
ALL
 27-54-00


R 
AIJ




Page 46
Feb 01/07

The system can be set again by operation in the opposite


direction.
(3) Rotary Actuator - Track 4
(Ref. Fig. 021)
The description and operation for the track 4 rotary actuator is the
same as that for the rotary actuator at track 1.
K. Flap Carriages
(Ref. Fig. 027)
Carriage - Track 1

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

The carriage at track 1 is machined from aluminium alloy forging. Four


vertical-load and two side-load rollers hold the carriage on its track.
The rollers are lubricated through grease points on the carriage.
Carriage - Track 2, 3 and 4
The carriages at tracks 2, 3 and 4 are machined from aluminium alloy
forgings. All three carriages are almost the same. Six vertical-load and
four side-load rollers hold each carriage on its track. The rollers are
lubricated through grease points on the carriage. A fail-safe hook keeps
the flap on the track if there is a structural failure of the carriage.
Bolts attach the carriages to the flaps. The bolts have eccentrics which
let you adjust the flaps.
L. Flap and Track Fairing Operating Mechanism
(Ref. Fig. 005)
Attached to the flap bottom surface, immediately outboard of each track
position, is a flap link arm. Bolted to the drive lever, on its related
actuator, is the forward end of each link arm. At tracks 1 and 4 are
links arms made of machined aluminium. At tracks 2 and 3 are link arms
made of machined titanium. The link arms transmit the movement from the
rotary actuators to the flap surface.

Attached to the flap bottom surface, at tracks 2, 3 and 4, is an arm


which operates the track fairing. Attached to the operating arm is a
linkage which operates the moveable track fairing during flap extension
and retraction.



EFF :
ALL
 27-54-00



AIJ




Page 47
Feb 01/11

Flap Carriages
Figure 027


EFF :
ALL
 27-54-00



AIJ




Page 48
Feb 01/07

7. ________________________________
Operation/Control and Indicating
(Ref. Fig. 003, 010, 012, 013)
A. Hydraulic Actuation
The SFCC 1 controls the valve block of the GREEN hydraulic system and the
related motor on the PCU. The SFCC 2 controls the valve block of the
YELLOW hydraulic system and the related motor on the PCU.
NOTE : The operation of the valve block of the GREEN hydraulic system and
____
the related motor is given. The operation of the valve block of
the YELLOW hydraulic system and the related motor is the same.
NOTE : The operation of the valve block is almost the same for the
____
extension and retraction of the flaps. The extend and retract
solenoid valves control the direction of the movement of the
hydraulic motor.
(1) Flap Extension (Retraction)
(a) When the SFCC 1 receives a command to extend (retract) the flaps,
it energizes the extend (retract) solenoid valve of the PCU valve
block.
(b) The energized extend (retract) solenoid valve lets hydraulic
fluid flow to one end of the spool of the PCU control valve
(referred to as the valve spool).
(c) The valve spool moves from the neutral position and lets
hydraulic fluid flow to:
- the POB solenoid valve
- the extend (retract) side of the motor.
(d) When the valve spool reaches the pressure on point, a signal
from the LVDT causes the SFCC 1 to energize the POB solenoid
valve:
- the POB releases
- the motor starts to turn
- the flaps extend (retract).
(e) As the flaps get near to the commanded position:
- the FPPU sends a signal to the SFCC 1 when the flaps are 6.69
deg. (FPPU) away from the commanded position
- the SFCC 1 energizes the retract (extend) solenoid valve (all
three valves are now energized)
- the opposite end of the valve spool receives fluid pressure



EFF :
ALL
 27-54-00


R 
AIJ




Page 49
Feb 01/07

- equal hydraulic forces occur at both ends of the valve spool


- the springs continue to move the valve spool in the direction
of the neutral position
- a restriction of the fluid flow to the motor occurs
- a reduction in the motor speed causes a reduction in the rate
of flap travel.
(f) When the flaps get to the commanded position:
- the FPPU sends a signal to the SFCC 1 when the flaps are 0.177
deg. (FPPU) away from the commanded position
- the SFCC 1 de-energizes the extend (retract) solenoid valve and
the POB solenoid valve
- the POB comes on
- when the LVDT shows that the valve spool is 1.5 mm from the
neutral position, the SFCC 1 de-energizes the retract (extend)
solenoid valve (all three valves are now de-energized)
- the fluid flow to the motor stops
- the motor stops
- the valve spool gets to and stays at the neutral position.
(g) The flaps stay locked by the POB until the next movement is
commanded.
B. Power Transmission
The PCU differential gearbox moves the flap transmission system in each
wing. The operation of the transmission system is the same for each wing.
Only one wing system is specified.
(1) Flap Extension
(a) The differential gearbox turns the torque shafts, which move the
four actuators at the same time, and at the same speed.
(b) Attached to the actuator output shafts are the drive levers. They
turn rearwards through an arc of 112 degrees to move the flap
link arms.
(c) The flap link arms move the flaps, on their carriages, along the
tracks. At the same time, the flap link arms turn the flaps
around the lateral pivot axis.
(d) As the flaps extend, the hinged section of the track fairing
lowers. This is caused by the effect of the arm which operates
the fairing.



EFF :
ALL
 27-54-00


R 
AIJ




Page 50
Feb 01/07

(2) Flap Retraction


(a) The torque shaft movement to retract the flaps is the opposite of
the movement to extend the flaps.
8. BITE
____
Not Applicable



EFF :
ALL
 27-54-00


R 
AIJ




Page 51
Feb 01/07

FLAPS HYDRAULIC ACTUATION AND POWER TRANSMISSION - ADJUSTMENT/TEST


__________________________________________________________________
TASK 27-54-00-710-001
Operational Test of the Flap System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
R

Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System



EFF :
ALL
 27-54-00



AIJ




Page 501
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-002
29-10-00-864-003
31-60-00-860-001
31-60-00-860-002

Depressurize the Yellow Hydraulic System


Depressurize the Blue Hydraulic System
EIS Start Procedure
EIS Stop Procedure

3. __________
Job Set-Up
Subtask 27-54-00-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
system is in operation.
Subtask 27-54-00-860-056
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-863-002).
(3) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).
R

(4) Pressurize the Green hydraulic system


(Ref. TASK 29-10-00-863-001).
Subtask 27-54-00-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-54-00



AIJ




Page 502
Feb 01/08

Subtask 27-54-00-865-052
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
Subtask 27-54-00-710-050
A. Operational Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do the Electronic Instrument System (EIS) start procedure (Ref. TASK
31-60-00-860-001).
(2) Do this test:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the center pedestal on the
panel 114VU:
- move the slat and flap control
lever to positions 1, 2, 3 and
FULL. Stop at every notch until
the flaps stop at each position
selected.

2. On the panel 114VU:


- move the slat and flap control
lever back to positions 3, 2, 1
and 0. Stop at every notch

On the aircraft:
- the flaps move to the set position.
On the ECAM upper DU:
- the flap position bar moves to the
set position
- the new lever position and the flaps
travel direction are shown.
On the aircraft:
- the flaps move to the set position.
On the ECAM upper DU:



EFF :
ALL
 27-54-00


R 
AIJ




Page 503
Aug 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------until the flaps stop at each
- the flap position bar moves to the
position selected.
set position
- the new lever position and the flaps
travel direction are shown
- no warnings related to the flap
system are shown.
5. Close-Up
________
Subtask 27-54-00-860-057
R

A. Put the aircraft back to its initial configuration.


(1) Depressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-864-002).

R
R

(2) Depressurize the Blue hydraulic system


(Ref. TASK 29-10-00-864-003).

R
R

(3) Depressurize the Green hydraulic system


(Ref. TASK 29-10-00-864-001).

R
R
R
R

(4) Do the EIS stop procedure

(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).

(Ref. TASK 31-60-00-860-002).

Subtask 27-54-00-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-54-00-942-050
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.



EFF :
ALL
 27-54-00



AIJ




Page 504
Aug 01/07

(3) Remove the warning notice(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00


R 
AIJ




Page 505
Aug 01/07

TASK 27-54-00-710-002
Operational Test of the Flap and Slat Systems
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
R

29-10-00-863-001
29-10-00-863-002
29-10-00-863-003

29-10-00-864-001
29-10-00-864-002
29-10-00-864-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System



EFF :
ALL
 27-54-00



AIJ




Page 506
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
31-60-00-860-001
31-60-00-860-002

EIS Start Procedure


EIS Stop Procedure

3. __________
Job Set-up
Subtask 27-54-00-941-063
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the flap
and slat systems are in operation.
Subtask 27-54-00-860-067
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
R

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).

R
R

(2) Pressurize the Yellow hydraulic system


(Ref. TASK 29-10-00-863-002).

R
R

(3) Pressurize the Blue hydraulic system


(Ref. TASK 29-10-00-863-003).

R
R
R

(4) Pressurize the Green hydraulic system


(Ref. TASK 29-10-00-863-001).



EFF :
ALL
 27-54-00



AIJ




Page 507
Aug 01/07

Subtask 27-54-00-865-078
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-54-00-865-068
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-54-00-710-051
A. Operational Test
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Do the Electronic Instrument System (EIS) start procedure (Ref. TASK
31-60-00-860-001).



EFF :
ALL
 27-54-00


R 
AIJ




Page 508
Aug 01/07

(2) Do this test:


------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the center pedestal on the
panel 114VU:
- move the slat and flap control
lever to position 1 and then to
position 2. Stop at both
notches until the flaps and
slats are in their new
position.

2. On the panel 114VU:


- move the slat and flap control
lever to the position 3.

On the aircraft:
- the flaps and slats move to their set
positions.
On the ECAM upper DU:
- the flap and slat position bars move
to their set positions
- the new position of the control lever
and the travel direction of the flaps
and slats are shown.
On the aircraft:
- the flaps move to the set position
- the slats do not move.
On the ECAM upper DU:
- the flap position bar moves to the
set position
- the slat position bar does not move
- the new position of the control lever
and the travel direction of the flaps
are shown.

3. On the panel 114VU:


- move the slat and flap control
lever to the position FULL.

On the aircraft:
- the flaps and slats move to their set
positions.
On the ECAM upper DU:
- the flap and slat position bars move
to their set positions
- the new position of the control lever
and the travel direction of the flaps
and slats are shown.

4. On the panel 114VU:

On the aircraft:



EFF :
ALL
 27-54-00



AIJ




Page 509
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- move the slat and flap control
- the flaps and slats move to their set
lever back to the position 3.
positions.
On the ECAM upper DU:
- the flap and slat position bars move
to their set positions
- the new position of the control lever
and the travel direction of the flaps
and slats are shown.
5. On the panel 114VU:
- move the slat and flap control
lever back to the position 2.

On the aircraft:
- the flaps move to the set position
- the slats do not move.
On the ECAM upper DU:
- the flap position bar moves to the
set position
- the slat position bar does not move
- the new position of the control lever
and the travel direction of the flaps
are shown.

6. On the panel 114VU:


- move the slat and flap control
lever back to the positions 1
and 0. Stop at both notches
until the flaps and slats are
in their new position.

On the aircraft:
- the flaps and slats move to their set
positions.
On the ECAM upper DU:
- the flap and slat position bars
to their set positions
- the new position of the control
and the travel direction of the
and slats are shown
- no warnings related to the flap
slat systems are shown.



EFF :
ALL
 27-54-00



AIJ




move
lever
flaps
and

Page 510
Feb 01/07

5. Close-up
________
Subtask 27-54-00-860-068
A. Put the aircraft back to its initial configuration.
(1) Depressurize the Yellow hydraulic system
(Ref. TASK 29-10-00-864-002).
(2) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(3) Depressurize the Green hydraulic system
(Ref. TASK 29-10-00-864-001).
(4) Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-54-00-865-079
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
14CC1, 14CC2
Subtask 27-54-00-942-069
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00


R 
AIJ




Page 511
Feb 01/08

TASK 27-54-00-820-001
Adjustment of the Flap Drive System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No
No

specific
specific
specific
specific
specific

460005835
98D27504005000
98D27504006000
98D27803000000

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 SAFETY BARRIER(S)
2 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 SLEEVE - GROUND LOCK
1 PIN RIGGING-FLAPS (TRACK 1)
3 PIN-RIGGING, FLAPS
2 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-00



AIJ




Page 512
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 04-022
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
31-32-00-860-006
32-00-00-481-002
32-12-00-010-001
32-12-00-410-001
57-51-37-000-002
R

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Safety Devices on the Landing
Gear Doors
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)



EFF :
ALL
 27-54-00



AIJ




Page 513
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-000-004
57-51-37-400-002

Removal of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground (for corrective action)
Manual Adjustment of the Position Pick-Off Units (for
corrective action)
Fig. 501
Fig. 502
Fig. 503

57-51-37-400-004
27-50-00-869-006
27-51-00-820-001
27-54-00-991-038-A
27-54-00-991-039-A
27-54-00-991-040-A
3. __________
Job Set-up
Subtask 27-54-00-860-077-A

A. Aircraft Maintenance Configuration


R

(1) Put the SAFETY BARRIER(S) in position.

(2) Put a WARNING NOTICE(S) in position to tell persons not to operate


the landing gear doors.
(3) Extension of the flaps
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(a) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(b) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-00



AIJ




Page 514
Nov 01/10

Subtask 27-54-00-865-080
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-54-00-010-067-A
C. Get Access
(Ref. Fig. 501/TASK 27-54-00-991-038-A)
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
(2) Install the SLEEVE - GROUND LOCK on the applicable main gear
door-actuator (Ref. TASK 32-00-00-481-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.
(4) Remove the applicable access panels (Ref. TASK 57-51-37-000-002) and
(Ref. TASK 57-51-37-000-004):
For the LH wing, remove the panels:
- 571AB
- 573AB, 573BB, 573CB
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB and 575GB.
For the RH wing, remove the panels:
- 671AB
- 673AB, 673BB, 673CB
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB and 675GB.
(5) Clean the rigging pin holes at track 1, 2, 3 and 4.
(Ref. Fig. 502/TASK 27-54-00-991-039-A)
(6) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-00


R 
AIJ




Page 515
May 01/09

Flap Transmission - Access Panels


Figure 501/TASK 27-54-00-991-038-A


EFF :
ALL
 27-54-00


R 
AIJ




Page 516
May 01/09

Installation of the Flap Rigging Pins


Figure 502/TASK 27-54-00-991-039-A



EFF :
ALL
 27-54-00



AIJ




Page 517
Nov 01/10

Subtask 27-54-00-865-081
D. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-54-00-866-060-A
E. Retraction of the flaps
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009). Do not do this
manually.
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on the panel 114VU.
R

(3) Put a WARNING NOTICE(S) on panel 114VU to tell persons not to operate
the flap/slat controls.
Subtask 27-54-00-740-052-A
F. Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Do a check of the Position Pick-Off Units (PPUs) on the Centralized
Fault Display System (CFDS) as follows:
(a) Energize the aircraft electrical circuits (Ref. TASK 24-41-00861-002).
(b) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the
Multipurpose Control Display Unit (MCDU) (Ref. TASK 31-32-00-860006).



EFF :
ALL
 27-54-00



AIJ




Page 518
Nov 01/10

(c) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- Push (in) the line key < SFCC
1.

On the MCDU:
- The MCDU shows the SFCC 1 menu.

2. Push (in) the NEXT PAGE button.

- The MCDU shows the subsequent page of


the SFCC 1 menu.

3. Push (in) the line key SYSTEM


DATA FLP >.

- The MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

4. Push (in) the line key < PPU.

- The MCDU shows the PPU DATA page(s):


Refer to Table 1.
NOTE : The APPU and the FPPU synchro
____
angles must agree in 1.3 deg.
The LH APPU and the RH APPU
synchro angles must agree in
0.45 deg.

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
NOTE : You must use these angles
____
that are shown during
removal as a datum. They
will let you compare the
APPU and the FPPU angles
after the adjustment of
the flap drive system.
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).



EFF :
ALL
 27-54-00


R 
AIJ




Page 519
May 01/09

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) shown on the MCDU at the flap position ZERO
|
|
|
------------------------------------------------------------------------------Subtask 27-54-00-865-082
G. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



R
EFF :
ALL
 27-54-00



AIJ




Page 520
May 01/10

4. Procedure
_________
(Ref. Fig. 502/TASK 27-54-00-991-039-A, 503/TASK 27-54-00-991-040-A)
Subtask 27-54-00-820-051-A
A. Adjustment of the Flap Track No. 1
R

(1) Install the PIN RIGGING-FLAPS (TRACK 1) (2) at the track 1.

R
R

(2) If you cannot install the PIN RIGGING-FLAPS (TRACK 1) (2) easily, do
the steps that follow:
(a) Remove the Torque Shaft 6204CM (6254CM):
1
_

Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS)


(98D27504030001) on a flap torque shaft, outboard of the
component that you will remove (Ref. TASK 27-50-00-400-003).

2
_

Remove the nuts (5) and the bolts (6) from the torque shaft
(4). If applicable, remove the spacers.
NOTE : Spacers between the universal joint (3) and the torque
____
shaft (4) adjust the length of the transmission. It is
possible that there are none or more than one spacer(s)
installed.

3
_

Remove the universal joint (3).

(b) Adjustment of the flap drive system (for free rigging pin):
1
_

Loosen the LOCK-TORQUE SHAFT (FLAPS AND SLATS) as necessary to


turn the torque shafts.

2
_

Turn the torque shaft 6206CM (6256CM) four turns in the


extension direction.

3
_

Turn the torque shaft 6206CM (6256CM) in the retraction


direction until the rigging pin (2) can be installed easily.

4
_

If the torque shaft 6206CM (6256CM) is accidentally turned too


far in the retraction direction:
- Do the adjustment procedure again until the rigging pin (2)
can be installed easily.

R
R



EFF :
ALL
 27-54-00



AIJ




Page 521
Nov 01/10

Torque Shafts - Flap Power Transmission


Figure 503/TASK 27-54-00-991-040-A13 (SHEET 1)


EFF :
ALL
 27-54-00


R 
AIJ




Page 522
May 01/10

Torque Shafts - Flap Power Transmission


Figure 503/TASK 27-54-00-991-040-A23 (SHEET 2)


EFF :
ALL
 27-54-00


R 
AIJ




Page 523
May 01/10

Torque Shafts - Flap Power Transmission


Figure 503/TASK 27-54-00-991-040-A33 (SHEET 3)


EFF :
ALL
 27-54-00


R 
AIJ




Page 524
May 01/10

(c) Preparation for Installation


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
1
_

Use a clean lint-free cotton cloth MISCELLANEOUS (Material No.


19-003) and the cleaning agent CLEANING AGENTS (Material No.
11-026) to clean the parts that follow:
- The nuts (5)
- The bolts (6)
- The flange of the universal joint (3)
- The flange of the torque shaft (4).

2
_

Dry the parts with compressed air.

3
_

Make sure that the parts retained from the removed component
are clean and in the correct condition.

4
_

Clean the component interface and/or the adjacent area.

5
_

Lubricate the torque splines as follows:


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
- Apply a
018) to
- Apply a
022) to

6
_

thin layer of the COMMON GREASE


the splines of the torque shaft
thin layer of the COMMON GREASE
the splines of the torque shaft

(Material No. 04(4)


(Material No. 04(4).

Apply a layer of the STORAGE PRESERVATION (Material No. 15007) to the parts that follow:
- The nuts (5)
- The bolts (6)
- The flange of the universal joint (3)
- The flange of the torque shaft (4).

(d) Install the torque shaft 6204CM (6254CM):


1
_

Put the universal joint (3) in the installation position. Make


sure that the flange aligns with the torque shaft (4).

2
_

Install the bolts (6) and the nuts (5). Tighten the nuts (5)
with your hand.

3
_

If necessary install the spacers.



EFF :
ALL
 27-54-00


R 
AIJ




Page 525
May 01/10

4
_
R

TORQUE the nuts (5) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).

(e) Install the PIN RIGGING-FLAPS (TRACK 1) (2).

R
R

1
_

Make sure that you can remove/install the rigging pin (2)
easily.

R
R

2
_

If you cannot remove/install the rigging pin (2) easily do the


adjustment procedure again.

(f) Make sure that:


- You cannot see the spline engagement groove at the movable
joint
- The dimension A is a minimum of 6.5 mm (0.2559 in.) at the
movable joint.
(g) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-5000-000-003)
Subtask 27-54-00-820-052-A
B. Adjustment of the Flap Track No. 2
R

(1) Install the PIN-RIGGING, FLAPS (1) at the track 2.

R
R

(2) If you cannot install the PIN-RIGGING, FLAPS (1) easily, do the steps
that follow:
(a) Remove the Torque Shaft 6210CM (6260CM):
1
_

Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS)


(98D27504030001) on a flap torque shaft, outboard of the
component that you will remove (Ref. TASK 27-50-00-400-003).

2
_

Remove the nuts (5) and the bolts (6) from the torque shaft
(4).

3
_

Remove the universal joint (3).

(b) Adjustment of the flap drive system (for free rigging pin):
1
_

Loosen the LOCK-TORQUE SHAFT (FLAPS AND SLATS) as necessary to


turn the torque shafts

2
_

Turn the torque shaft 6218CM (6268CM) four turns in the


extension direction.



EFF :
ALL
 27-54-00



AIJ




Page 526
Nov 01/10

a
_

Turn the torque shaft 6218CM (6268CM) in the retraction


direction until the rigging pin (1) can be installed
easily.

b
_

If the torque shaft 6218CM (6268CM) is accidentally turned


too far in the retraction direction:
- Do the adjusment procedure again, until the rigging pin
(1) can be installed easily.

R
R

R
R

(c) Preparation for Installation


1
_

Use a clean lint-free cotton cloth MISCELLANEOUS (Material No.


19-003) and the cleaning agent CLEANING AGENTS (Material No.
11-026) to clean the parts that follow:
- The nuts (5)
- The bolts (6)
- The flange of the universal joint (3)
- The flange of the torque shaft (4).

2
_

Dry the parts with compressed air.

3
_

Make sure that the parts retained from the removed component
are clean and in the correct condition.

4
_

Clean the component interface and/or the adjacent area.

5
_

Lubricate the torque splines as follows:


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
- Apply a
018) to
- Apply a
022) to

6
_

thin layer of the COMMON GREASE


the splines of the torque shaft
thin layer of the COMMON GREASE
the splines of the torque shaft

(Material No. 04(4)


(Material No. 04(4).

Apply a layer of the STORAGE PRESERVATION (Material No. 15007) to the parts that follow:
- The nuts (5)
- The bolts (6)
- The flange of the universal joint (3)
- The flange of the torque shaft (4).

(d) Install the torque shaft 6210CM (6260CM):


1
_

Put the universal joint (3) in the installation position. Make


sure that the flange aligns with the torque shaft (4).



EFF :
ALL
 27-54-00



AIJ




Page 527
Nov 01/10

2
_

Install the bolts (6) and the nuts (5). Tighten the nuts (5)
with your hand.

3
_

TORQUE the nuts (5) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).

(e) Install the PIN-RIGGING, FLAPS (1).

R
R

1
_

Make sure that you can remove/install the rigging pin (1)
easily.

R
R

2
_

If you cannot remove/install the rigging pin (1) easily, do


the adjustment procedure again.

(f) Make sure that:


- You cannot see the spline engagement groove at the movable
joint
- The dimension A is a minimum of 6.5 mm (0.2559 in.) at the
movable joint.
(g) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-5000-000-003).
Subtask 27-54-00-820-053-A
C. Adjustment of the Flap Track No. 3
R

(1) Install the PIN-RIGGING, FLAPS (1) at the track 3.

R
R

(2) If you cannot install the PIN-RIGGING, FLAPS (1) easily, do the steps
that follow:
(a) Remove the Torque Shaft 6218CM (6268CM):
1
_

Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS)


(98D27504030001) on a flap torque shaft, outboard of the
component that you will remove (Ref. TASK 27-50-00-400-003).

2
_

Remove the nuts (12) and the bolts (11) from the torque shaft
(10).

3
_

Remove the universal joint (13).

(b) Adjustment of the flap drive system (for free rigging pin):
1
_

Loosen the LOCK-TORQUE SHAFT (FLAPS AND SLATS) as necessary to


turn the torque shafts.



R
EFF :
ALL
 27-54-00



AIJ




Page 528
Nov 01/10

2
_

Turn the torque shaft 6224CM (6274CM) four turns in the


extension direction.

3
_

Turn the torque shaft 6224CM (6274CM) in the retraction


direction until the rigging pin (1) can be installed easily.

4
_

If the torque shaft 6224CM (6274CM) is accidentally turned too


far in the retraction direction:
- Do the adjustment procedure again, until the rigging pin (1)
can be installed easily.

R
R

(c) Preparation for Installation


1
_

Use a clean lint-free cotton cloth MISCELLANEOUS (Material No.


19-003) and the cleaning agent CLEANING AGENTS (Material No.
11-026) to clean the parts that follow:
- The nuts (12)
- The bolts (11)
- The flange of the universal joint (13)
- The flange of the torque shaft (10).

2
_

Dry the parts with compressed air.

3
_

Make sure that the parts retained from the removed component
are clean and in the correct condition.

4
_

Clean the component interface and/or the adjacent area.

5
_

Lubricate the torque splines as follows:


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
- Apply a
018) to
Or:
- Apply a
022) to

6
_

thin layer of the COMMON GREASE (Material No. 04the splines of the torque shaft (10).
thin layer of the COMMON GREASE (Material No. 04the splines of the torque shaft (10).

Apply a layer of the STORAGE PRESERVATION (Material No. 15007) to the parts that follow:
- The nuts (12)
- The bolts (11)
- The flange of the universal joint (13)
- The flange of the torque shaft (10).



EFF :
ALL
 27-54-00



AIJ




Page 529
Nov 01/10

(d) Install the torque shaft 6218CM (6268CM):

1
_

Put the universal joint (13) in the installation position.


Make sure that the flange aligns with the torque shaft (10).

2
_

Install the bolts (11) and the nuts (12). Tighten the nuts
(12) with your hand.

3
_

TORQUE the nuts (12) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).

(e) Install the PIN-RIGGING, FLAPS (1).

R
R

1
_

Make sure that you can remove/install the rigging pin (1)
easily.

R
R

2
_

If you cannot remove/install the rigging pin (1) easily do the


adjustment procedure again.

(f) Make sure that:


- You cannot see the spline engagement groove at the movable
joint
- The dimension A is a minimum of 6.5 mm (0.2559 in.) at the
movable joint.
(g) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-5000-000-003).
Subtask 27-54-00-820-054-A
D. Adjustment of the Flap Track No. 4
R

(1) Install the PIN-RIGGING, FLAPS (1) at the track 4.

R
R

(2) If you cannot install the PIN-RIGGING, FLAPS (1) easily, do the steps
that follow:
(a) Remove the Torque Shaft 6222CM (6272CM):
1
_

Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS)


(98D27504030001) on a flap torque shaft, outboard of the
component that you will remove (Ref. TASK 27-50-00-400-003).

2
_

Remove the nuts (22) and the bolts (23) from the torque shaft
(20).

3
_

Remove the universal joint (21).



EFF :
ALL
 27-54-00



AIJ




Page 530
Nov 01/10

(b) Adjustment of the flap drive system (for free rigging pin):
1
_

Loosen the LOCK-TORQUE SHAFT (FLAPS AND SLATS) as necessary to


turn the torque shafts.

2
_

Turn the torque shaft 6232CM (6282CM) four turns in the


extension direction.

3
_

Turn the torque shaft 6232CM (6284CM) in the retraction


direction until you can install the rigging pin (1) easily.

4
_

If you turn the torque shaft 6232CM (6284CM) accidentally too


far in the retraction direction:
- Do the adjustment procedure again, until you can install the
rigging pin (1) easily.

R
R

(c) Preparation for Installation


1
_

Use a clean lint-free cotton cloth MISCELLANEOUS (Material No.


19-003) and the cleaning agent CLEANING AGENTS (Material No.
11-026) to clean the parts that follow:
- The nuts (22)
- The bolts (23)
- The flange of the universal joint (21)
- The flange of the torque shaft (20).

2
_

Dry the parts with compressed air.

3
_

Make sure that the parts retained from the removed component
are clean and in the correct condition.

4
_

Clean the component interface and/or the adjacent area.

5
_

Lubricate the torque splines as follows:


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
- Apply a
018) to
- Apply a
022) to

6
_

thin layer of the COMMON GREASE


the splines of the torque shaft
thin layer of the COMMON GREASE
the splines of the torque shaft

(Material No. 04(20)


(Material No. 04(20).

Apply a layer of the STORAGE PRESERVATION (Material No. 15007) to the parts that follow:
- The nuts (22)
- The bolts (23)



EFF :
ALL
 27-54-00



AIJ




Page 531
Nov 01/10

- The flange of the universal joint (21)


- The flange of the torque shaft (20).
(d) Install the torque shaft 6222CM (6272CM):

1
_

Put the universal joint (21) in the installation position.


Make sure that the flange aligns with the torque shaft (20).

2
_

Install the bolts (23) and the nuts (22). Tighten the nuts
(22) with your hand.

3
_

TORQUE the nuts (22) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).

(e) Install the PIN-RIGGING, FLAPS (1).

R
R

1
_

Make sure that you can remove/install the rigging pin (1)
easily.

R
R

2
_

If you cannot remove/install the rigging pin (1) easily do the


adjustment procedure again.

(f) Make sure that:


- You cannot see the spline engagement groove at the movable
joint
- The dimension A is a minimum of 6.5 mm (0.2559 in.) at the
movable joint.
(g) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-5000-000-003).
Subtask 27-54-00-865-083
E. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20
121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-54-00



AIJ




Page 532
Nov 01/10

Subtask 27-54-00-740-050-A
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display-System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display-Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position ZERO on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- Push (in) the line key < SFCC
1.

On the MCDU:
- The MCDU shows the SFCC 1 menu.

2. Push (in) the NEXT PAGE button.

- The MCDU shows the next page of the


SFCC 1 menu.

3. Push (in) the line key SYSTEM


DATA FLP >.

- The MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

4. Push (in) the line key < PPU.

- The MCDU shows the PPU DATA page(s):


Refer to Table 1.
NOTE : The APPU and the FPPU synchro
____
angles must not be different by
more than 1.3 deg.
The LH APPU and the RH APPU
synchro angles must not be
different by more than 0.45 deg.

5. Push the line key < RETURN


frequently until the CFDS menu
page is shown.
6. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).



EFF :
ALL
 27-54-00


R 
AIJ




Page 533
Nov 01/10

INTENTIONALLY BLANK



R

 27-54-00



AIJ




Page 534
Nov 01/10

Subtask 27-54-00-820-055-A
G. Adjustment After BITE Test
(1) After adjustment of the flap drive system:
(a) Make sure that the FPPU angle values agree with the values that
you recorded before the FPPU was removed (+/- 0.2 deg).
(b) Make sure that the APPU angle values agree with the values that
you recorded before the APPU was removed (+/- 0.2 deg).
(c) Make sure that the APPU/FPPU angles (deg) agree +/- 1.3 deg.
(d) Make sure that the LH APPU and the RH APPU angles agree +/- 0.45
deg.
(2) If the APPU angles are not in the specified limits in relation to the
FPPU angles, do these steps:
(a) Disconnect the APPU and adjust the APPU input shaft (Ref. TASK
27-51-00-820-001).
(b) Do step (2)(a) again until the APPU angles are in the specified
limits in relation to the FPPU angles.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position ZERO
|
|
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-00



AIJ




Page 535
May 01/10

Subtask 27-54-00-860-078-A

H. Preparation for Test

(1) Remove the rigging pins from the tracks 1, 2, 3 and 4.

R
R

(2) Reset the Wing Tip Brake (WTB) of the flap system on the ground if
necessary (Ref. TASK 27-50-00-869-006).

(3) Extend the flaps on the ground (Ref. TASK 27-50-00-866-008).

(4) Retract the flaps on the ground (Ref. TASK 27-50-00-866-009).

R
R

(5) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).

(6) Do a check of the flap PPUs on the MCDU as follows:

R
R
R

------------------------------------------------------------------------------ACTION
RESULT
-------------------------------------------------------------------------------

R
R
R

1. On the MCDU:
- Push (in) the line key < SFCC
1.

On the MCDU:
- The MCDU shows the SFCC 1 menu.

R
R

- Push (in) the NEXT PAGE button.

- The MCDU shows the next page of the


SFCC 1 menu.

R
R

- Push (in) the line key SYSTEM


DATA FLP >.

- The MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

R
R

- Push (in) the line key < PPU.

- The MCDU shows the PPU DATA page(s):


Refer to Table 1.

R
R
R

- Push the line key < Return


frequently until the CFDS menu
page is shown.

(7) Make sure that the APPU/FPPU angles (deg) agree(+/- 1.3deg).

R
R

(8) Make sure that the LH APPU and the RH APPU angles agree (+/0.45deg).



EFF :
ALL
 27-54-00



AIJ




Page 536
Nov 01/08

(9) If the APPU and FPPU angles are not within the specified limit, do
the steps that follow:
(a) Disconnect the APPU and adjust the APPU input shaft.
(b) Do again step (9)(a) until the APPU angles are in the specified
limits in relation to the FPPU angles
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) shown on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------(10) Do the adjustment of the interconnecting strut (Ref. TASK 27-51-44820-001).
Subtask 27-54-00-710-052-A
J. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
NOTE : Due to system play and PCU tolerances, possibly you cannot
____
install the PINS- RIGGING, FLAPS after the operational test.
This does not indicate an incorrect adjustment.
(2) If it is necessary to examine the system again do the Check of the
Flap Drive System (Ref. TASK 27-54-00-220-007).



EFF :
ALL
 27-54-00



AIJ




Page 537
May 01/10

5. Close-up
________
R

Subtask 27-54-00-860-079-A

A. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Install the access panels:

R
R
R
R
R

(a) For the LH wing, install these access panels:


- 571AB
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-400-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-400-004).

R
R
R
R
R

(b) For the RH wing, install these access panels:


- 671AB
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-400-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-400-004).

(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).

R
R

(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00



AIJ




Page 538
Nov 01/08

FLAPS HYDRAULIC ACTUATION AND POWER TRANSMISSION - INSPECTION/CHECK


___________________________________________________________________
TASK 27-54-00-200-001
Detailed Visual Inspection of the Transmission Assembly (Including Part of the
Transmission in Zone 140)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275400-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 FLASHLIGHT
1 MIRROR - INSPECTION, FLEXIBLE



EFF :
ALL
 27-54-00



AIJ




Page 601
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 15-007

AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-080-002
27-50-00-866-008
27-50-00-866-009
32-00-00-481-001
32-12-00-010-001
32-12-00-410-001
57-51-37-000-002
R
57-51-37-000-004
57-51-37-400-002
R
57-51-37-400-004
27-54-00-612-001
27-54-00-991-006
27-54-00-991-001
27-54-00-991-002

Removal of the Flap/Slat Control-Lever Locking Tool


(98D27803000000)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Installation of the Safety Devices on the Landing
Gears
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Quantity Check of the Semi-Fluid remaining in a Flap
Rotary Actuator (After Leakage) (for corrective
action)
Fig. 601
Fig. 602
Fig. 603



EFF :
ALL
 27-54-00



AIJ




Page 602
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-54-00-991-006)
Subtask 27-54-00-941-052
A. Safety Precautions
(1) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
(2) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.
(4) Put a warning notice in position to tell persons not to operate the
landing gear doors.
(5) Put the safety barriers in position.
Subtask 27-54-00-860-059
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
Subtask 27-54-00-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-00



AIJ




Page 603
Nov 01/07

R
R

Flap Transmission - Access Panels


Figure 601/TASK 27-54-00-991-006



EFF :
ALL
 27-54-00



AIJ




Page 604
Feb 01/07

Subtask 27-54-00-010-051
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
applicable wing.
(2) Open the MLG doors (Ref. TASK 32-12-00-010-001).
(3) Make sure that the SLEEVE - GROUND LOCK is installed on each MLG door
actuating cylinder.
(4) Remove the access panels:
(a) For the LH wing, remove the following panels:
- 571AB
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-000-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-000-004).
(b) For the RH wing, remove the following panels:
- 671AB
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-000-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-000-004).
4. Procedure
_________
(Ref. Fig. 602/TASK 27-54-00-991-001, 603/TASK 27-54-00-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-00



AIJ




Page 605
Feb 01/11

R
R

Flap System - Component Location


Figure 602/TASK 27-54-00-991-001



EFF :
ALL
 27-54-00



AIJ




Page 606
Feb 01/07

R
R

Steady Bearings and Torque Shaft - Component Location


Figure 603/TASK 27-54-00-991-002



EFF :
ALL
 27-54-00



AIJ




Page 607
Feb 01/07

Subtask 27-54-00-210-050
A. Inspection
(1) Examine the Power Control Unit (PCU)
(a) Make sure that the PCU is correctly installed.
(b) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine
the external surfaces of the PCU for:
- Cracks
- Corrosion
- Signs of leakage
- Satisfactory surface protection.
(c) Make sure that the Line Replaceable Units (LRU) are correctly
installed. The LRUs are the:
- Two valve blocks
- Two inlet filters
- Six solenoid valves
- Two hydraulic motors
- Two Pressure-Off Brakes
- Feedback Position Pick-off Unit
- Instrumentation Position Pick-off Unit.
(2) Examine each torque shaft assembly
(a) Make sure that each torque shaft assembly is correctly installed
and that the spring clip is safetied to the pin correctly.
(b) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine
the torque shafts and the input joints for:
- Distortion
- Dents
- Cracks
- Corrosion
- Satisfactory surface protection.
(c) Make sure that the connections between the torque shafts and the
input joints are tight.
R
R
R

(d) Do an inspection of the flange bolts for corrosion. If you do not


find corrosion, apply a new layer of the STORAGE PRESERVATION
(Material No. 15-007) on the flange bolts.



EFF :
ALL
 27-54-00



AIJ




Page 608
Aug 01/11

(3) Examine each steady bearing assembly


(a) Make sure that each steady bearing assembly is correctly
installed.
(b) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine
each steady bearing assembly for:
- Cracks
- Corrosion
- Satisfactory surface protection.
(4) Examine each gearbox assembly
NOTE : The gearbox assembly is filled with a grease/semi-fluid but it
____
is not a sealed unit. It is usual for this grease/semi-fluid
to have some oil separation. The external surfaces of the
gearbox can be moist with this oil. The oil in the unit that
mixes with the grease/semi-fluid will change back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a stable condition. This
will not cause damage to the unit.
(a) Make sure that each gearbox assembly is correctly installed.
(b) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine
the external surfaces of each gearbox assembly for:
- Cracks
- Corrosion
- Signs of leakage
- Satisfactory surface protection.
(5) Examine each actuator assembly
NOTE : Each actuator assembly has a rotary actuator and an offset
____
gearbox. The rotary actuator is filled with a
grease/semi-fluid but it is not a sealed unit. It is usual for
this grease/semi-fluid to have some oil separation. The
external surfaces of the actuator assembly can be moist with
this oil. The oil in the unit that mixes with the
grease/semi-fluid will change back during operation. The oil
separation will decrease during in-service operation until the
lubricant is in a stable condition. This will not cause damage
to the unit.
(a) Make sure that each actuator is correctly installed.
(b) Make sure that the items that follow are correctly installed:
- The offset gearbox
- The torque limiter
- The plug-in rotary actuator.



EFF :
ALL
 27-54-00


R 
AIJ




Page 609
May 01/11

(c) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine


the external surfaces of the actuators for:
- Cracks
- Corrosion
- Signs of leakage
- Satisfactory surface protection.
(d) If you find a leak, do a check of the quantity of the semi-fluid
in the flap actuator(s) (Ref. TASK 27-54-00-612-001).
(e) Make sure that the torque limiter indicator has not operated.
(6) Examine the carriages at the track 1, 2, 3 and 4 positions:
(a) Make sure that the carriages are correctly installed.
(b) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE to examine
the carriages for:
- Cracks
- Corrosion
- Satisfactory surface protection.
R

(7) Examine the flap link arm

R
R

(a) Make sure that the flap drive lever and the flap drive arm are
correctly installed and in good condition.
5. Close-up
________
Subtask 27-54-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels:
(a) For the LH wing, install the following panels:
- 571AB
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-400-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-400-004).



EFF :
ALL
 27-54-00



AIJ




Page 610
May 01/11

(b) For the RH wing, install the following panels:


- 671AB
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-400-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-400-004).
(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-54-00-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-00-860-060
C. Aircraft Maintenance Configuration
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-54-00-942-053
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00



AIJ




Page 611
Nov 01/07

TASK 27-54-00-210-002
Check of the Integrity of the Flap Transmission System and Inspection of the
Seal Witness Drains of the Wing Tip Brakes
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275100-03
NOTE : If you do this task together with MPD-TASK 275100-01, do MPD-TASK
____
275100-01 first.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


flashlight
mirror
safety barriers
warning notice
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE



EFF :
ALL
 27-54-00



AIJ




Page 612
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-51-51-000-001
27-51-51-400-001
32-12-00-010-001
32-12-00-410-001
27-54-00-991-006
27-54-00-991-004
27-54-00-991-005

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Removal of the Flap Wing-Tip Brake
Installation of the Flap Wing-Tip Brake
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 601
Fig. 604
Fig. 605

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-54-00-991-006)
Subtask 27-54-00-860-065
A. Aircraft Maintenance Configuration
(1) Do the extension of the flaps on ground (Ref. TASK 27-50-00-866-008).
Subtask 27-54-00-941-054
B. Safety Precautions
(1) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(2) Put the warning notice in position to tell persons not to operate the
flight controls.
(3) Put the warning notice in position to tell persons not to operate the
landing gear doors.
(4) Put the safety barriers in position.



EFF :
ALL
 27-54-00


R 
AIJ




Page 613
Feb 01/11

Subtask 27-54-00-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-00-010-054
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
applicable wing.
(2) Open the MLG doors (Ref. TASK 32-12-00-010-001).
(3) Make sure that the SLEEVE - GROUND LOCK is installed on each MLG door
actuating cylinder.
4. Procedure
_________
(Ref. Fig. 604/TASK 27-54-00-991-004, 605/TASK 27-54-00-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-00-210-052
A. Inspection
(1) Examine the torque shaft assemblies.
(a) Use a flashlight and a mirror to examine the torque shaft
assemblies for:
- cracks
- signs of stress
- signs of damage.



EFF :
ALL
 27-54-00



AIJ




Page 614
Feb 01/11

R
R

Torque Shaft - Steady Bearing Typical Installation


Figure 604/TASK 27-54-00-991-004



EFF :
ALL
 27-54-00



AIJ




Page 615
Feb 01/07

R
R

Seal Witness Drains - Wing Tip Brake


Figure 605/TASK 27-54-00-991-005



EFF :
ALL
 27-54-00



AIJ




Page 616
Feb 01/07

(2) Examine the torque shaft flanges.


(a) Use a flashlight and a mirror to examine the torque shaft flanges
and their joints for:
- cracks
- signs of stress
- signs of damage.
(3) Examine the steady bearings.
(a) Use a flashlight and a mirror to examine the steady bearings and
their structural interfaces for:
- cracks
- signs of stress
- signs of damage.
(4) Examine the WTB.
(a) Use a flashlight and a mirror to examine the external surface of
the WTB at the seal witness drains.
(b) The area around the seal witness drains is permitted to be wet
with oil. But, if a drop of hydraulic fluid is found, replace the
WTB (Ref. TASK 27-51-51-000-001) (Ref. TASK 27-51-51-400-001).
NOTE : The area near the seal witness drains, which is wet with
____
oil, must be cleaned.
R

5. Close-up
________
Subtask 27-54-00-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R

(2) Close the MLG doors (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-00



AIJ




Page 617
May 01/09

Subtask 27-54-00-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-00-860-066
C. Aircraft Configuration

R
R

(1) Do the retraction of the flaps on ground (Ref. TASK 27-50-00-866009).


Subtask 27-54-00-942-057
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00



AIJ




Page 618
May 01/09

TASK 27-54-00-200-003
Detailed Dimensional Check - Free Movement at the Trailing Edge of the Flaps
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
To check for flap backlash
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

R
R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific
No specific

safety barriers
warning notice
adjustable access platform 3.0 m (9 ft. 10 in.)
1 PIN DIA 5 MM (0,197 IN), LENGHT 100 MM (3,937 IN.)
ALU
2 PIN DIA 10 MM (0,394 IN),LENGHT 100 MM (3,937 IN.)
ALU
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-00



AIJ




Page 619
May 01/11

B. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R

1
1
6
6
10
10
15
15
25
26
26

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin

27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05

33U-100A
33V-100
33U-150A
33V-150
33U-200
33V-200
33U-030A
33V-030
35H-080
35H-080
35H-130A

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-50-00-866-011
27-50-00-866-012
27-51-44-400-001
27-54-46-000-001
27-54-46-000-002
27-54-46-400-001
27-54-46-400-002
27-54-49-000-001
27-54-49-000-002
27-54-49-000-003
27-54-49-000-004
27-54-49-400-001
27-54-49-400-002
27-54-49-400-003
27-54-49-400-004

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Manual Extension of the Flaps
Manual Retraction of the Flaps
Installation of the Interconnecting Strut
Removal of the Nos. 2, 3 and 4 Flap Carriages
Removal of the No.1 Flap Carriage
Installation of the Nos 2, 3 and 4 Flap Carriages
Installation of the No.1 Flap Carriage
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
Installation of the Flap Track 1 Actuator
6205CM(6255CM)
Installation of the Flap Track 2 Actuator
6211CM(6261CM)
Installation of the Flap Track 3 Actuator
6221CM(6271CM)
Installation of the Flap Track 4 Actuator
6233CM(6283CM)



EFF :
ALL
 27-54-00



AIJ




Page 620
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-55-000-001
27-54-55-000-002
27-54-55-000-003
27-54-55-400-001
27-54-55-400-002
27-54-55-400-003
27-54-61-000-001
27-54-61-000-002
27-54-61-220-001
27-54-61-400-001
27-54-61-400-006
27-54-62-000-001
27-54-62-220-001
27-54-62-400-001
53-35-11-000-001
57-51-33-000-001
57-51-33-400-001
57-52-00-220-015
57-53-00-220-023

R
R
R
R
R

ASRM 57-51-33-101
CMM 275442
CMM 275446
CMM 575132
27-54-00-991-027-A
27-54-00-991-028
27-54-00-991-030
27-54-00-991-010
27-54-00-991-029-A
27-54-00-991-031
27-54-00-991-032
27-54-00-991-026

Removal of the Flap-Actuator Lever Assembly - Tracks


1 and 2
Removal of the Flap-Actuator Lever Assembly - Track 3
Removal of the Flap-Actuator Lever Assembly - Track 4
Installation of the Flap-Actuator Lever Assembly Tracks 1 and 2
Installation of the Flap-Actuator Lever Assembly Track 3
Installation of the Flap-Actuator Lever Assembly Track 4
Removal of the Inboard Flap
Removal of the Flap Kink-Seals and Cushion-Seals
Dimensional Check of the Joints that Connect the Flap
Actuator Levers to the Flap Drive Struts (Tracks 1
and 2)
Installation of the Inboard Flap
Installation of the Flap Kink-Seals and Cushion-Seals
Removal of the Outboard Flap
Dimensional Check of the Joints that connect the Flap
Actuator Levers to the Flap Drive Struts (Tracks 3
and 4)
Installation of the Outboard Flap
Removal of the Wing-to-Fuselage Fairings
Removal of the No.1 Flap Track Beam
Installation of the No.1 Flap Track Beam
Detailed Dimensional Check of the Joints that Attach
the Flap to the Flap Carriage (Tracks 1 and 2)
Detailed Dimensional Check of the Joints that Attach
the Flap to the Flap Carriage (Tracks 3 and 4)
(for corrective action)
(for corrective action)
(for corrective action)
(for corrective action)
Fig. 606
Fig. 607
Fig. 608
Fig. 609
Fig. 610
Fig. 611
Fig. 612
Fig. 613



EFF :
ALL
 27-54-00



AIJ




Page 621
May 01/10

3. __________
Job Set-up
Subtask 27-54-00-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.
(4) Put the adjustable access platform in position below the applicable
flap.
Subtask 27-54-00-860-062
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
(2) Remove the flap kink-seals (Ref. TASK 27-54-61-000-002).
(3) Remove the applicable wing to fuselage panels (Ref. TASK 53-35-11000-001):
- for the LH flap, remove 193AB
- for the RH flap, remove 194AB.
(4) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
4. Procedure
_________
R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-00



AIJ




Page 622
May 01/10

Subtask 27-54-00-220-050-A
A. Detailed Dimensional Check - Free Movement at the Trailing Edge of the
Inboard Flap
(Ref. Fig. 606/TASK 27-54-00-991-027-A, 607/TASK 27-54-00-991-028,
608/TASK 27-54-00-991-030, 609/TASK 27-54-00-991-010)
(1) At the track 1 position, disconnect the flap drive arm from the
rotary actuator lever-arm:
(a) Remove and discard the cotter pins (1) and (6).
(b) Remove the nut (2) and the washer (3).
(c) Remove the bolt (5) and the locking plate (4).
(d) Remove the nut (7) and the washer (8).
R
R

(e) Remove the bolt (9) and install the PIN DIA 5 MM (0,197 IN),
LENGHT 100 MM (3,937 IN.) ALU.
NOTE : The diameter of the aluminum pin is approximately 6.0 mm
____
(0.2362 in.) less than the bolt (9) it replaces. The pin
is 100 mm (3.9370 in.) long and is made locally from LN
1798 3.1354T3511. The pin is temporary and has two
functions:
- it keeps the joint together when you extend/retract the
flaps
- it is easy to remove the pin to disconnect the joint
when the flaps are extended.
(f) Extend the flaps manually (Ref. TASK 27-50-00-866-011) as
follows:
1
_

Slowly extend the flaps until the dimension T at track 2 is


approximately 6.0 mm (0.2362 in.).

2
_

Dimension T can be +/- 1.0 mm (0.0393 in.) but it must be set


during the flap extension procedure. Do not retract the flaps
in small amounts to set the dimension T.

(g) Remove the aluminum pin.



EFF :
ALL
 27-54-00



AIJ




Page 623
May 01/11

R
R

Flap to Rotary Actuator Drive Lever - To Disconnect the Inboard Flap


Figure 606/TASK 27-54-00-991-027-A



EFF :
ALL
 27-54-00



AIJ




Page 624
May 01/10

Rotary Actuator Drive-Lever - To Measure The Free Play (Track 1)


Figure 607/TASK 27-54-00-991-028



EFF :
ALL
 27-54-00



AIJ




Page 625
May 01/10

Rotary Actuator Drive-Lever - To Measure the Free Play (Track 2)


Figure 608/TASK 27-54-00-991-030



EFF :
ALL
 27-54-00



AIJ




Page 626
May 01/10

Flaps Trailing Edge Free Movement - Location and Details of Measurement


Positions
R
Figure 609/TASK 27-54-00-991-010

EFF :
ALL

Page 627


May 01/10


AIJ




27-54-00

R
R

(2) At the track 2 position, measure the total free movement of the flap
trailing edge:

R
R

(a) Refer to step 4.A.(1)(f) and make sure the flaps are extended
correctly.

(b) Make sure that the travel ranges are clear.

R
R
R

(c) Apply a down force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.

R
R
R

NOTE : Do not apply too much force to cause the system


____
components, mechanism or the aircraft fixed structure to
move or bend.

R
R

(d) Hold the flap in this position, measure and record the dimension
Z and then release the flap.

R
R
R

(e) Apply an up force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.

R
R
R

NOTE : Do not apply too much force to cause the system


____
components, mechanism or the aircraft fixed structure to
move or bend.

R
R

(f) Hold the flap in this position, measure and record the dimension
Y and then release the flap.

R
R

(g) To find the total free movement, subtract the dimension Z from
the dimension Y.

R
R

(3) At the track 1 position, measure the total free movement of the
actuator lever (dimension X):

R
R
R

(a) Apply a down force (by hand) to the actuator lever. Apply
sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(b) Hold the actuator lever in this position, then measure and record
the dimension T.

R
R
R

(c) Apply an up force (by hand) to the actuator lever. Apply


sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.



EFF :
ALL
 27-54-00



AIJ




Page 628
May 01/10

(d) Hold the actuator lever in this position, then measure and record
the dimension S.
(e) To find the total free movement (dimension X), subtract the
dimension S from the dimension T.
(4) Install the aluminum pin through the joint where you removed the bolt
(9).
(5) Manually retract the flaps fully and connect the drive system
(Ref. TASK 27-50-00-866-012).
(6) Remove the aluminum pin.
(7) At the track 1 position, temporarily connect the flap drive arm to
the rotary actuator drive-lever as follows:
(a) Install the bolt (9), the washer (8) and the nut (7).
(b) Hand tighten the nut (7).
(c) Install the bolt (5), the locking plate (4), the washer (3) and
the nut (2).
(d) Hand tighten the nut (2).
(8) At the track 2 position, disconnect the flap drive arm from the
rotary actuator lever-arm:
(a) Remove and discard the cotter pins (10) and (15).
(b) Remove the nut (11) and the washer (12).
(c) Remove the bolt (14) and the locking plate (13).
(d) Remove the nut (16) and the washer (17).
R
R

(e) Remove the bolt (18) and install the PIN DIA 10 MM (0,394
IN),LENGHT 100 MM (3,937 IN.) ALU.
(f) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(g) Remove the aluminum pin.



EFF :
ALL
 27-54-00



AIJ




Page 629
May 01/11

R
R

(9) At the inboard end of the flap, measure the total free movement of
the flap trailing edge:

R
R

(a) Make sure that the flaps are fully extended, and that the travel
ranges are clear.

R
R
R

(b) Apply a down force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.

R
R
R

NOTE : Do not apply too much force to cause the system


____
components, mechanism or the aircraft fixed structure to
move or bend.

R
R

(c) Hold the flap in this position, measure and record the dimension
Z and then release the flap.

R
R
R

(d) Apply an up force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.

R
R
R

NOTE : Do not apply too much force to cause the system


____
components, mechanism or the aircraft fixed structure to
move or bend.

R
R

(e) Hold the flap in this position, measure and record the dimension
Y and then release the flap.

R
R

(f) To find the total free movement, subtract the dimension Z from
the dimension Y.

R
R

(10) At the track 2 position, measure the total free movement of the
actuator lever (dimension X):

R
R
R

(a) Apply a down force (by hand) to the actuator lever. Apply
sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(b) Hold the actuator lever in this position, then measure and record
the dimension T.

R
R
R

(c) Apply an up force (by hand) to the actuator lever. Apply


sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(d) Hold the actuator lever in this position, then measure and record
the dimension S.



EFF :
ALL
 27-54-00



AIJ




Page 630
May 01/10

R
R

(e) To find the total free movement (dimension X), subtract the
dimension S from the dimension T.

R
R

(11) Install the aluminum pin through the joint where you removed the bolt
(18).

(12) Retract the flaps fully (Ref. TASK 27-50-00-866-009).

(13) Remove the aluminum pin.

R
R

(14) At the track 2 position, temporarily connect the flap drive arm to
the rotary actuator drive-lever as follows:

(a) Install the bolt (18), the washer (17) and the nut (16).

(b) Hand tighten the nut (16).

R
R

(c) Install the bolt (14), the locking plate (13), the washer (12)
and the nut (11).

(d) Hand tighten the nut (11).

R
R
R
R
R
R

(15) Compare the measured free movement dimensions:


- the maximum acceptable value of free movement at the inboard flap
trailing edge at tracks 1 and 2 is 10.0 mm (0.3937 in.)
- for the maximum acceptable value of dimension X (free movement of
the lever arm) refer to the table 601.
Subtask 27-54-00-220-057-A

R
R
R
R

B. Detailed Dimensional Check - Free Movement at the Trailing Edge of the


Outboard Flap
(Ref. Fig. 609/TASK 27-54-00-991-010, 610/TASK 27-54-00-991-029-A,
611/TASK 27-54-00-991-031, 612/TASK 27-54-00-991-032)

R
R

(1) At the track 3 position, disconnect the outboard flap drive-arm from
the rotary actuator lever-arm:

(a) Remove and discard the cotter pins (25) and (26).

(b) Remove the nut (24) and the washer (23).

(c) Remove the bolt (21) and the locking plate (22).

(d) Remove the nut (27) and the washer (28).



EFF :
ALL
 27-54-00



AIJ




Page 631
May 01/10

R
R

Flap to Rotary Actuator Drive Lever - To Disconnect the Outboard Flap


Figure 610/TASK 27-54-00-991-029-A



EFF :
ALL
 27-54-00



AIJ




Page 632
May 01/10

Rotary Actuator Drive-Lever - To Measure the Free Play (Track 3)


Figure 611/TASK 27-54-00-991-031


EFF :
ALL
 27-54-00


R 
AIJ




Page 633
May 01/10

Rotary Actuator Drive-Lever - To Measure the Free Play (Track 4)


Figure 612/TASK 27-54-00-991-032


EFF :
ALL
 27-54-00


R 
AIJ




Page 634
May 01/10

R
R

(e) Remove the bolt (20) and install the aluminum pin PIN DIA 10 MM
(0,394 IN),LENGHT 100 MM (3,937 IN.) ALU.
NOTE : The diameter of the aluminum pin is approximately 6.0 mm
____
(0.2362 in.) less than the bolt (20) it replaces. The
installation of the pin is temporary and has two
functions:
- It keeps the joint together when you extend/retract the
flaps
- It is easy to remove the pin to disconnect the joint
when the flaps are extended.
(f) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(g) Remove the aluminum pin.
(2) At the track 4 position, measure the total free movement of the flap
trailing edge:
(a) Make sure that the flaps are fully extended, and that the travel
ranges are clear.
(b) Apply a down force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.
NOTE : Do not apply too much force to cause the system
____
components, mechanism or the aircraft fixed structure to
move or bend.
(c) Hold the flap in this position, then measure and and record the
dimension Z.
(d) Apply an up force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.
NOTE : Do not apply too much force to cause the system
____
components, mechanism or the aircraft fixed structure to
move or bend.
(e) Hold the flap in this position, measure and record the dimension
Y and then release the flap.
(f) To find the total free movement, subtract the dimension Z from
the dimension Y.



EFF :
ALL
 27-54-00



AIJ




Page 635
May 01/11

R
R

(3) At the track 3 position, measure the total free movement of the
actuator lever (dimension X):

R
R
R

(a) Apply a down force (by hand) to the actuator lever. Apply
sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(b) Hold the actuator lever in this position, then measure and record
the dimension T.

R
R
R

(c) Apply an up force (by hand) to the actuator lever. Apply


sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(d) Hold the actuator lever in this position, then measure and record
the dimension S.

R
R

(e) To find the total free movement (dimension X), subtract the
dimension S from the dimension T.

R
R

(4) Install the aluminum pin through the joint where you removed the bolt
(20).

(5) Retract the flaps fully (Ref. TASK 27-50-00-866-009).

(6) Remove the aluminum pin.

R
R

(7) At the track 3 position, temporarily connect the flap drive arm to
the rotary actuator drive-lever as follows:

(a) Install the bolt (20), the washer (28) and the nut (27).

(b) Hand tighten the nut (27).

R
R

(c) Install the bolt (21), the locking plate (22), the washer (23)
and the nut (24).

(d) Hand tighten the nut (24).

R
R

(8) At the track 4 position, disconnect the outboard flap drive-arm from
the rotary actuator drive-lever:

(a) Remove and discard the cotter pins (25) and (26).

(b) Remove the nut (24) and the washer (23).

(c) Remove the bolt (21) and the locking plate (22).



EFF :
ALL
 27-54-00



AIJ




Page 636
May 01/10

(d) Remove the nut (27) and the washer (28).


R
R

(e) Remove the bolt (20) and install the aluminum pin PIN DIA 10 MM
(0,394 IN),LENGHT 100 MM (3,937 IN.) ALU.
(f) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(g) Remove the aluminum pin.
(9) At the track 3 position, measure the total free movement of the flap
trailing edge:
(a) Make sure that the flaps are fully extended, and that the travel
ranges are clear.
(b) Apply a down force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.
NOTE : Do not apply too much force to cause the system
____
components, mechanism or the aircraft fixed structure to
move or bend.
(c) Hold the flap in this position, then measure and and record the
dimension Z.
(d) Apply an up force (by hand) to the trailing edge of the flap.
Apply sufficient force to make the flap move through possible
free movement in the flap system mechanism and joints.
NOTE : Do not apply too much force to cause the system
____
components, mechanism or the aircraft fixed structure to
move or bend.
(e) Hold the flap in this position, measure and record the dimension
Y and then release the flap.
(f) To find the total free movement, subtract the dimension Z from
the dimension Y.
(10) At the track 4 position, measure the total free movement of the
actuator lever (dimension X):
(a) Apply a down force (by hand) to the actuator lever. Apply
sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.



EFF :
ALL
 27-54-00



AIJ




Page 637
May 01/11

R
R

(b) Hold the actuator lever in this position, then measure and record
the dimension T.

R
R
R

(c) Apply an up force (by hand) to the actuator lever. Apply


sufficient force to make the actuator lever move through possible
free movement in the flap system mechanism and joints.

R
R

(d) Hold the actuator lever in this position, then measure and record
the dimension S.

R
R

(e) To find the total free movement (dimension X), subtract the
dimension S from the dimension T.

R
R

(11) Install the aluminum pin through the joint where you removed the bolt
(20).

(12) Retract the flaps fully (Ref. TASK 27-50-00-866-009).

(13) Remove the aluminum pin.

R
R

(14) At the track 4 position, temporarily connect the flap drive arm to
the rotary actuator drive-lever as follows:

(a) Install the bolt (20), the washer (28) and the nut (27).

(b) Hand tighten the nut (27).

R
R

(c) Install the bolt (21), the locking plate (22), the washer (23)
and the nut (24).

(d) Hand tighten the nut (24).

R
R
R
R
R

(15) Compare the measured free movement dimensions:


- the maximum acceptable value of free movement at the outboard flap
trailing edge at tracks 3 and 4 is 11.0 mm (0.4330 in.)
- for the maximum acceptable value of dimension X (free movement of
the lever arm) refer to the table 601.



EFF :
ALL
 27-54-00



AIJ




Page 638
May 01/10

Subtask 27-54-00-220-058
C. Table 601 shows the maximum values for dimension X.

------------------------------------------------------------------------------| Track Number


|
Dimension X (maximum)
|
------------------------------------------------------------------------------|
1
|
4.00 mm (0.157 in.)
|
|--------------------|--------------------------------------------------------|
|
2
|
1.51 mm (0.060 in.)
|
|--------------------|--------------------------------------------------------|
|
3
|
1.79 mm (0.070 in.)
|
|--------------------|--------------------------------------------------------|
|
4
|
1.37 mm (0.054 in.)
|
------------------------------------------------------------------------------Table 601
Subtask 27-54-00-220-056
D. Checks to Identify and Correct too much Free Movement at the Trailing
Edge of the Flaps
(Ref. Fig. 613/TASK 27-54-00-991-026)
(1) General
(a) The flow chart shows the process to find and correct too much
free movement. Use the flow chart as a guide. Each time you make
a correction, do a free movement check until the free movement is
in limits.
(b) When the free movement value is too much, do the checks that
follow to identify the cause. Start at the inboard flap track 2
and then track 1. Subsequently, do the checks at the outboard
flap track 3 and then track 4.
(c) When you look for backlash, move the flap up and down 4 or 5
times to help you see the backlash or wear.
(2) Do the steps that follow only when they are applicable:
(a) Do a general visual inspection:
1
_

Visually inspect the connection joints for backlash or wear


between the flap actuator and the flap track beam and
carriage. Some of the possible causes of too much backlash in
the connection joints are:



EFF :
ALL
 27-54-00



AIJ




Page 639
Nov 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 16 (SHEET 1)


EFF :
ALL
 27-54-00


R 
AIJ




Page 640
May 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 26 (SHEET 2)


R
EFF :
ALL
 27-54-00



AIJ




Page 641
May 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 36 (SHEET 3)


EFF :
ALL
 27-54-00


R 
AIJ




Page 642
May 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 46 (SHEET 4)


EFF :
ALL
 27-54-00


R 
AIJ




Page 643
May 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 56 (SHEET 5)


EFF :
ALL
 27-54-00


R 
AIJ




Page 644
May 01/10

Flaps Trailing Edge - Flow Chart to do the Free Movement Checks


Figure 613/TASK 27-54-00-991-026- 66 (SHEET 6)


EFF :
ALL
 27-54-00


R 
AIJ




Page 645
May 01/10

- a bearing that has moved to an incorrect position or a


bearing that cannot move
- a loose bush
- a damaged or missing spherical bearing liner
- worn bushes and bolts.
2
_

An indication that the backlash is too much is when a


connection shows more radial or axial movement than an
equivalent adjacent component.

3
_

Make sure that all components are installed correctly.

4
_

Replace components that are unserviceable.

(b) If the free movement of the lever arm (dimension X) is too much,
remove the unserviceable actuator and install a serviceable
actuator:
1
_

for the flap track 1 actuator (Ref. TASK 27-54-49-000-001) and


(Ref. TASK 27-54-49-400-001).

2
_

for the flap track 2 actuator (Ref. TASK 27-54-49-000-002) and


(Ref. TASK 27-54-49-400-002).

3
_

for the flap track 3 actuator (Ref. TASK 27-54-49-000-003) and


(Ref. TASK 27-54-49-400-003).

4
_

for the flap track 4 actuator (Ref. TASK 27-54-49-000-004) and


(Ref. TASK 27-54-49-400-004).

(c) If you have installed a new flap actuator and the free movement
of the lever arm (dimension X) is too much, do a check of the
actuator lever splines:
1
_

Remove the applicable lever:


- for the flap track 1 and 2 lever (Ref. TASK 27-54-55-000001)
- for the flap track 3 lever (Ref. TASK 27-54-55-000-002)
- for the flap track 4 lever (Ref. TASK 27-54-55-000-003).

2
_

Do a check for wear of the actuator lever splines.

3
_

Install a
- for the
001)
- for the
- for the

serviceable lever:
flap track 1 and 2 lever (Ref. TASK 27-54-55-400flap track 3 lever (Ref. TASK 27-54-55-400-002)
flap track 4 lever (Ref. TASK 27-54-55-400-003).



EFF :
ALL
 27-54-00


R 
AIJ




Page 646
May 01/10

(d) Do a detailed dimensional check of the connection of the joint


between the flap drive arm and the rotary actuator lever-arm:
1
_

Remove the flap sufficiently to allow the flap drive arm to be


disconnected from the rotary actuator lever arm:
- for tracks 1 and 2 (Ref. TASK 27-54-61-000-001)
- for tracks 3 and 4 (Ref. TASK 27-54-62-000-001).

2
_

Do the detailed dimensional check:


- for tracks 1 and 2 (Ref. TASK 27-54-61-220-001)
- for tracks 3 and 4 (Ref. TASK 27-54-62-220-001).

(e) Do a detailed dimensional check of the flap attachments:


1
_

Remove the applicable flap:


- for the inboard flap (Ref. TASK 27-54-61-000-001)
- for the outboard flap (Ref. TASK 27-54-62-000-001).

2
_

Do a detailed dimensional check of the inboard flap


attachments (Ref. TASK 57-52-00-220-015).

3
_

Do a detailed dimensional check of the outboard flap


attachments (Ref. TASK 57-53-00-220-023).

(f) Make sure the free play between the flap track and the top roller
is in limits.
(g) Do a detailed dimensional check of the flap carriage main
rollers, the upper rollers and the pivot pins of lubrication
blocks:
1
_

Remove the applicable flap carriage:


- for the Nos. 2, 3 and 4 flap carriages (Ref. TASK 27-54-46000-001)
- for the No. 1 flap carriage (Ref. TASK 27-54-46-000-002).

2
_

In the workshop, refer to the applicable CMM and do a detailed


dimensional check:
- for the Nos. 2, 3 and 4 flap carriages (Ref. CMM 275446)
- for the No. 1 flap carriage (Ref. CMM 275442).

3
_

Install the applicable serviceable flap carriage:


- for the Nos. 2, 3 and 4 flap carriages (Ref. TASK 27-54-46400-001)
- for the No. 1 flap carriage (Ref. TASK 27-54-46-400-002).



EFF :
ALL
 27-54-00


R 
AIJ




Page 647
May 01/10

(h) Do a detailed dimensional check of the Nos. 2, 3 and 4 flap track


beams (Ref. ASRM 57-51-33-101).
(i) Do a detailed dimensional check of the No. 1 flap track beam:
1
_

Remove the No. 1 flap track beam (Ref. TASK 57-51-33-000-001).

2
_

In the workshop, refer to the CMM and do a detailed


dimensional check of the No 1. flap track beam (Ref. CMM
575132).

3
_

Install a servicable No.1 flap track beam (Ref. TASK 57-51-33400-001).

(j) Install a serviceable flap:


- for the inboard flap (Ref. TASK 27-54-61-400-001)
- for the outboard flap (Ref. TASK 27-54-62-400-001).
R

Subtask 27-54-00-420-050-A

E. Connect the Flap Drive Arms

(1) At the track 1 position:

R
R

(a) Connect the flap drive arm to the rotary actuator drive-lever
with the bolt (9), the washer (8) and the nut (7).

R
R

(b) TORQUE the nut (7) to between 1.6 and 1.8 m.daN (11.79 and 13.27
lbf.ft) and safety with the new cotter pin (6).

R
R

(c) Install the locking plate (4), the bolt (5), the washer (3) and
the nut (2).

R
R

(d) TORQUE the nut (2) to between 0.4 and 0.45 m.daN (35.39 and 39.82
lbf.in) and safety with the new cotter pin (1).

(2) At the track 2 position:

R
R

(a) Connect the flap drive arm to the rotary actuator drive-lever
with the bolt (18), the washer (17) and the nut (16).

R
R

(b) TORQUE the nut (16) to between 1.8 and 2.3 m.daN (13.27 and 16.96
lbf.ft) and safety with a new cotter pin (15).

R
R

(c) Install the locking plate (13), the bolt (14), the washer (12)
and the nut (11).



EFF :
ALL
 27-54-00



AIJ




Page 648
May 01/10

R
R
R

(d) TORQUE the nut (11) to between 0.4 and 0.45 m.daN (35.39 and
39.82 lbf.in) and safety with the new cotter pin (10).
Subtask 27-54-00-420-051-A

F. Connect the Flap Drive Arms

(1) At the track 3 position:

R
R

(a) Connect the flap drive arm to the rotary actuator drive-lever
with the bolt (20), the washer (28) and the nut (27).

R
R

(b) Hand tighten the nut (27) and safety with the new cotter pin
(26).

R
R

(c) Install the locking plate (22), the bolt (21), the washer (23)
and the nut (24).

R
R

(d) TORQUE the nut (24) to between 3.0 and 3.6 m.daN (22.12 and 26.54
lbf.ft) and safety with the new cotter pin (26).

(2) At the track 4 position:

R
R

(a) Connect the flap drive arm to the rotary actuator drive-lever
with the bolt (20), the washer (28) and the nut (27).

R
R

(b) Hand tighten the nut (27) and safety with the new cotter pin
(26).

R
R

(c) Install the locking plate (22), the bolt (21), the washer (23)
and the nut (24).

R
R

(d) TORQUE the nut (24) to between 3.0 and 3.6 m.daN (22.12 and 26.54
lbf.ft) and safety with the new cotter pin (25).
5. Close-up
________
Subtask 27-54-00-860-061
A. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) If applicable, connect the interconnecting strut (Ref. TASK 27-51-44400-001).



EFF :
ALL
 27-54-00



AIJ




Page 649
May 01/10

(2) If applicable, install the flap kink seals (Ref. TASK 27-54-61-400006).
(3) If applicable, retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-54-00-942-065
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00


R 
AIJ




Page 650
May 01/10

**ON A/C 001-008,


TASK 27-54-00-220-006-A
Visual Inspection of Inner Flap Drive Trunnion Clamp-Type Steel Rubbing Pads
for Wear
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275100-07
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

safety barriers
spark-proof lamp
warning notice
access platform 3 m (9 ft. 10 in.)
1 LIGHT SOURCE - SPARK-PROOF
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



R
EFF :
001-008,
 27-54-00



AIJ




Page 651
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-008D
Material No. 09-008E
Material No. 09-008F
Material No. 11-026
Material No. 19-003
Material No. 19-025

USA AMS-S-83318
CLASS B
QUICK REPAIR FUEL TA NK SEALANT TEMPORARY
(Ref. 20-31-00)
USA AMS 3277
QUICK REPAIR FUEL TA NK SEALANT TEMPORARY
(Ref. 20-31-00)
USA MIL-S-83430
QUICK REPAIR FUEL TA NK SEALANT TEMPORARY
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS5687
LOCKWIRE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-34-24-869-002
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
32-12-00-010-001
32-12-00-410-001
53-35-11-000-001
53-35-11-400-001
27-54-00-991-048-B
27-54-00-991-049

Aircraft Grounding for the Maintenance Operations


Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Wing-to-Fuselage Fairings
Installation of the Wing-to-Fuselage Fairings
Fig. 614
Fig. 615



R
EFF :
001-008,
 27-54-00



AIJ




Page 652
Feb 01/11

3. __________
Job Set-up
Subtask 27-54-00-941-069
A. Safety Precautions
(1) Put a warning notice in position to tell persons not to operate the
flight controls.
(2) Put a warning notice in position to tell persons not to operate the
landing gear doors.
(3) Put the safety barriers in position.
Subtask 27-54-00-860-085
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever.
(3) Open the MLG doors (Ref. TASK 32-12-00-010-001).
(4) Install the SLEEVE - GROUND LOCK on the applicable MLG door actuating
cylinder.
(5) Make sure that the aircraft is electrically grounded (Ref. TASK 1234-24-869-002).
Subtask 27-54-00-865-089
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



R
EFF :
001-008,
 27-54-00



AIJ




Page 653
Feb 01/11

Subtask 27-54-00-010-070
D. Get Access
(Ref. Fig. 614/TASK 27-54-00-991-048-B)
(1) Put the access platform in position below the zone 581(681).
(2) Remove these wing to fuselage fairings (Ref. TASK 53-35-11-000-001):
- for the LH flap remove fairing 193AB and 193BB.
- for the RH flap remove fairing 194AB and 194BB.
(3) Remove the hook (1) from the sliding panel (3):
(a) Hold the hook (1) and remove the screws (2).
(b) Move the sliding panel (3) away from the flap drive trunnion and
remove the hook (1).
Subtask 27-54-00-110-053
E. Preparation for Inspection
(1) Put the spark-proof lamp adjacent to the inspection area.
(2) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean the flap trunnion.
4. Procedure
_________
Subtask 27-54-00-220-065
A. Visual Inspection of the Flap Drive Trunnions Clamp-Type Steel Rubbing
Pads
(Ref. Fig. 614/TASK 27-54-00-991-048-B, 615/TASK 27-54-00-991-049)
(1) Examine the pads (5) of the clamp assembly (4) for wear marks in AREA
1.
(a) If no wear marks are found or if the depth of the deepest wear
mark is less than 2.0 mm (0.0787 in.), repeat the inspection at
the subsequent scheduled interval.



R
EFF :
001-008,
 27-54-00



AIJ




Page 654
Feb 01/11

Sliding-Panel Hook Assembly - Access Details


Figure 614/TASK 27-54-00-991-048-B


R
EFF :
001-008,
 27-54-00



AIJ




Page 655
Feb 01/11

Wear Pad/Clamp Assembly - Installation Details


Figure 615/TASK 27-54-00-991-049


R
EFF :
001-008,
 27-54-00



AIJ




Page 656
Feb 01/11

(b) If the depth of the wear marks found are equal ore more than 2.0
mm (0.0787 in.), replace the clamp assembly (4) :
WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.
_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
1
_

Remove and discard the lockwire from the clamp assembly (4).

2
_

Remove the clamp assembly (4) from the flap drive trunnion.
Discard the clamp assembly (4).

3
_

Use a clean lint-free cloth MISCELLANEOUS (Material No. 19003) and the CLEANING AGENTS (Material No. 11-026) to clean
all the remaining sealant from the flap drive trunnion.

4
_

Apply new SEALANTS (Material No. 09-008D) or SEALANTS


(Material No. 09-008E) or SEALANTS (Material No. 09-008F) to
the mating surface of the flap drive trunnion and the new
clamp assembly (4).

5
_

Install the new clamp assembly (4) on the flap drive drive
trunnion so that:
- The short end of the pads (5) is in the aft direction
- The long end of the pads (5) is in the forward direction.

6
_

Adjust the position of the clamp assembly (4) so that the


dimension X is between 28.0 mm (1.1023 in.) and 32.0 MM
(1.2598 IN.).

7
_

Safety the clamp assembly (4) on the flap drive trunnion with
the lockwire MISCELLANEOUS (Material No. 19-025).

8
_

Use a clean lint-free cloth MISCELLANEOUS (Material No. 19003) and the CLEANING AGENTS (Material No. 11-026) to
carefully remove any unwanted sealant from the flap drive
trunnion/clamp assembly interface.
NOTE : The cure time for the sealant is 24 hours.
____

(2) Examine the hook (1) for wear marks in AREA 2.


(a) If no wear marks are found or if the depth of the deepest wear
mark is less than 2.0 mm (0.0787 in.), repeat the inspection at
the subsequent scheduled interval.



R
EFF :
001-008,
 27-54-00



AIJ




Page 657
Feb 01/11

(b) If the depth of the wear marks found are equal ore more than 2.0
mm (0.0787 in.), replace the hook (1):
1
_

Discard the hook (1).

5. Close-up
________
Subtask 27-54-00-410-063
A. Close Access
(Ref. Fig. 614/TASK 27-54-00-991-048-B)
(1) Install the hook (1) to the sliding panel (3):
NOTE : The installation procedure for the hook (1) or the
____
installation of a replacement hook (1) is the same.
(a) Put the hook (1) in the correct position on the flap drive
trunnion.
(b) Move the sliding panel (3) to align the holes of the sliding
panel (3) with anchor-nuts of the hook (1).
(c) Install the screws (2).
(d) TORQUE the screws (2) to between 0.80 and 0.90 m.daN (70.79 and
79.64 lbf.in).
(2) Remove the LIGHT SOURCE - SPARK-PROOF from the inspection area.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Install these wing to fuselage fairings (Ref. TASK 53-35-11-400-001):
- For the LH flap install the fairings 193AB and 193BB
- For the RH flap install the fairings 194AB and 194BB.
(5) Close the MLG doors (Ref. TASK 32-12-00-410-001).
(6) Remove the access platform(s).
Subtask 27-54-00-865-090
B. Make sure that this(these) circuit breaker(s) is(are) closed:
6CV, 8CV.



R
EFF :
001-008,
 27-54-00



AIJ




Page 658
Feb 01/11

Subtask 27-54-00-860-086
C. Aircraft Maintenance Configuration
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do the operational test of the flaps (Ref. TASK 27-54-00-710-001).
Subtask 27-54-00-942-075
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



R
EFF :
001-008,
 27-54-00



AIJ




Page 659
Feb 01/11

**ON A/C ALL


TASK 27-54-00-220-007
Check of the Flap Drive System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
460005835
98D27508625000
98D27803000000

1
1
1
1
1
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
SAFETY BARRIER(S)
WARNING NOTICE(S)
SLEEVE - GROUND LOCK
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-00



AIJ




Page 660
Feb 01/11

INTENTIONALLY BLANK



R

 27-54-00



AIJ




Page 661
Feb 01/11

INTENTIONALLY BLANK



R

 27-54-00



AIJ




Page 662
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-50-00-866-009
27-50-00-869-006
27-54-00-710-001
31-32-00-860-006
32-00-00-481-002
32-12-00-010-001
32-12-00-410-001
57-51-37-000-002
R
57-51-37-000-004
57-51-37-400-002
R
57-51-37-400-004
27-51-00-820-001
27-54-00-820-001
27-54-00-991-043
27-54-00-991-044

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Reset of the Wing Tip Brake (WTB) of the Flap System
on the Ground
Operational Test of the Flap System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Safety Devices on the Landing
Gear Doors
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Manual Adjustment of the Position Pick-Off Units (for
corrective action)
Adjustment of the Flap Drive System (for corrective
action)
Fig. 616
Fig. 617



EFF :
ALL
 27-54-00



AIJ




Page 663
Nov 01/09

3. __________
Job Set-up
Subtask 27-54-00-860-080
A. Aircraft Maintenance Configuration
R

(1) Put the SAFETY BARRIER(S) in position.

(2) Put a WARNING NOTICE(S) in position to tell persons not to operate


the landing gear doors.
(3) Extension of the flaps
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(a) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(b) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.
Subtask 27-54-00-865-084
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-00-010-068
C. Get Access
(Ref. Fig. 616/TASK 27-54-00-991-043, 617/TASK 27-54-00-991-044)
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
(2) Install the SLEEVE - GROUND LOCK on the applicable main gear
door-actuator (Ref. TASK 32-00-00-481-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.



EFF :
ALL
 27-54-00



AIJ




Page 664
Nov 01/10

Check Pin - Access Panels


Figure 616/TASK 27-54-00-991-043


EFF :
ALL
 27-54-00


R 
AIJ




Page 665
May 01/09

Installation of the Check Pins


Figure 617/TASK 27-54-00-991-044


EFF :
ALL
 27-54-00


R 
AIJ




Page 666
May 01/09

(4) Remove the applicable access panels (Ref. TASK 57-51-37-000-002) and
(Ref. TASK 57-51-37-000-004):
For the LH wing, remove the panels:
- 573BB
- 575CB and 575GB.
For the RH wing, remove the panels:
- 673BB
- 675CB and 675GB.
(5) Clean the rigging pin holes at the track 1, 2, 3 and 4.
(6) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.
Subtask 27-54-00-865-085
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-00-866-061
E. Retraction of the flaps
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009). Do not do this
manually.
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the
flap/slat control lever on panel 114VU.
R

(3) Put a WARNING NOTICE(S) on panel 114VU to tell persons not to operate
the flap/slat controls.
Subtask 27-54-00-865-086
F. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-00



AIJ




Page 667
Nov 01/10

4. Procedure
_________
Subtask 27-54-00-220-064
A. Installation of the Check Pins
(Ref. Fig. 617/TASK 27-54-00-991-044)
(1) Install the applicable check pin of the tool set CHECK-PIN TRACK 1-4
(1) in the track 1 position.
(a) If you cannot insert the check pin of the tool set CHECK-PIN
TRACK 1-4 (1) in the track 1 position easily, do the adjustment
of the flap drive system (Ref. TASK 27-54-00-820-001).
(2) Install the applicable check pin of the tool set CHECK-PIN TRACK 1-4
(2) in the track 2 position.
(a) If you cannot insert the check pin of the tool set CHECK-PIN
TRACK 1-4 (2) in the track 2 position easily, do the adjustment
of the flap drive system (Ref. TASK 27-54-00-820-001).
(3) Install the applicable check pin of the tool set CHECK-PIN TRACK 1-4
(2) in the track 3 position.
(a) If you cannot insert the check pin of the tool set CHECK-PIN
TRACK 1-4 (2) in the track 3 position easily , do the adjustment
of the flap drive system (Ref. TASK 27-54-00-820-001).
(4) Install the applicable check pin of the tool set CHECK-PIN TRACK 1-4
(2) in the track 4 position.
(a) If you cannot insert the check pin of the tool set CHECK-PIN
TRACK 1-4 (2) in the track 4 position easily, do the adjustment
of the flap drive system (Ref. TASK 27-54-00-820-001).
Subtask 27-54-00-740-051
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display-System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).



EFF :
ALL
 27-54-00


R 
AIJ




Page 668
Nov 01/10

(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display-Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) in the slat/flap control
lever position 0 on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- Push (in) the line key < SFCC 1. - The MCDU shows the SFCC 1 menu.
2. Push (in) the NEXT PAGE button.

- The MCDU shows the next page of the


SFCC 1 menu.

3. Push (in) the line key SYSTEM DATA - The MCDU shows the SFCC 1 FLAP
FLP >.
SYSTEM DATA menu.
4. Push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or
push (in) the line key PRNT > to
get a print out of the screen.

APPU angle __________________


FPPU angle __________________

6. Push the line key < RETURN


frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK 2441-00-862-002).
Subtask 27-54-00-820-056
C. Adjustment after BITE Test
(1) After check of the L/H (R/H) flap drive system:
(a) Make sure that the APPU/FPPU angles (deg) agree +/- 1.3 deg. at
flap positions 1, 2, 3 and within +/- 0.9 deg. at flap position
0.
(b) Make sure that the LH APPU and the RH APPU angles agree +/- 0.45
deg.



EFF :
ALL
 27-54-00



AIJ




Page 669
Feb 01/11

(2) If the APPU angles are not in the specified limits in relation to the
FPPU angles, do these steps:
(a) Disconnect the APPU and adjust the APPU input shaft (Ref. TASK
27-51-00-820-001).
(b) Do step (2)(a) again until the APPU angles are in the specified
limits in relation to the FPPU angles.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position 0
|
|
|
------------------------------------------------------------------------------Subtask 27-54-00-860-082
D. Preparation for Test
(1) Remove the check pins (1) from the tracks 1, 2, 3 and 4.
(2) Reset the Wing Tip Brake (WTB) of the flap system if necessary
(Ref. TASK 27-50-00-869-006).
Subtask 27-54-00-710-053
E. Test
(1) Do the Operational Test of the Flap System (Ref. TASK 27-54-00-710001).



EFF :
ALL
 27-54-00



AIJ




Page 670
May 01/10

5. Close-up
________
Subtask 27-54-00-860-081
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels:
(a) For the LH wing, install these access panels (Ref. TASK 57-51-37400-002) and (Ref. TASK 57-51-37-400-004):
- 573BB
- 575CB, 575GB.
(b) For the RH wing, install these access panels (Ref. TASK 57-51-37400-002) and (Ref. TASK 57-51-37-400-004):
- 673BB
- 675CB, 675GB.
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(4) Close the MLG doors (Ref. TASK 32-12-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00


R 
AIJ




Page 671
May 01/09

TASK 27-54-00-612-001
Quantity Check of the Semi-Fluid remaining in a Flap Rotary Actuator (After
Leakage)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Do a check of the quantity of semi-fluid remaining in a flap rotary actuator
(after leakage).
Do this task only on actuators that show a leakage.
R



EFF :
ALL
 27-54-00



AIJ




Page 672
Aug 01/11

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No
No
No
No

specific
specific
specific
specific

A685064
FOR FIN 6205CM, 6255CM
No specific

circuit breaker(s) safety clip(s)


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 MEASURING-EQUIPMENT, SEMIFUID
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

Material No. 04-025


Material No. 05-115
Material No. 11-026
Material No. 19-003

USA AMS 3057


LUBRICANT, SEMIFLUID (Ref. 20-31-00)
USA MIL-P-8116B
JOINTING COMPOUND (CONDUCTIVE) (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-50-00-866-011
27-50-00-866-012
27-54-49-000-001
27-54-49-000-002
27-54-49-000-003
27-54-49-000-004

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Manual Extension of the Flaps
Manual Retraction of the Flaps
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
Removal of the Flap Track 4 Actuator 6233CM(6283CM)



EFF :
ALL
 27-54-00



AIJ




Page 673
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-49-400-001
27-54-49-400-002
27-54-49-400-003
27-54-49-400-004
27-60-00-866-002
27-54-00-991-045
27-54-00-991-046
27-54-00-991-047
FOR FIN 6205CM, 6255CM
32-12-00-010-001
32-12-00-410-001
FOR FIN 6211CM
57-51-37-000-002
57-51-37-400-002
FOR FIN 6261CM
57-51-37-000-002
57-51-37-400-002
FOR FIN 6221CM
57-51-37-000-004
57-51-37-400-004
FOR FIN 6271CM
57-51-37-000-004
57-51-37-400-004
FOR FIN 6233CM
57-51-37-000-004

Installation of the Flap Track 1 Actuator


6205CM(6255CM)
Installation of the Flap Track 2 Actuator
6211CM(6261CM)
Installation of the Flap Track 3 Actuator
6221CM(6271CM)
Installation of the Flap Track 4 Actuator
6233CM(6283CM)
Extension-Retraction of the Spoilers for Maintenance
Fig. 618
Fig. 619
Fig. 620
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-54-00


R 
AIJ




Page 674
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-400-004
FOR FIN 6283CM
57-51-37-000-004
57-51-37-400-004

Installation of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
Subtask 27-54-00-941-068
A. Safety Precautions
R

(1) Put the WARNING NOTICE(S) in position in the cockpit to tell persons
not to operate the flight controls and the landing gear doors.

(2) Put the SAFETY BARRIER(S) in position.


Subtask 27-54-00-860-083
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Extend the spoilers 1 thru 5 (Ref. TASK 27-60-00-866-002).
Subtask 27-54-00-865-087
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-00



AIJ




Page 675
Nov 01/10

Subtask 27-54-00-010-069
D. Get Access
(1) FOR 6205CM, 6255CM
(a) Open the applicable Main Landing Gear (MLG) door 734, 744
(Ref. TASK 32-12-00-010-001).
(b) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position in the
applicable MLG bay.
(2) FOR 6211CM, 6261CM
(a) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the
applicable zone 573 (673).
(b) FOR 6211CM
- Remove the access panel 573AB (Ref. TASK 57-51-37-000-002).
(c) FOR 6261CM
- Remove the access panel 673AB (Ref. TASK 57-51-37-000-002).
(3) FOR 6221CM, 6271CM, 6233CM, 6283CM
(a) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the
applicable zone 575 (675).
(b) FOR 6221CM
- Remove the access panel 575BB (Ref. TASK 57-51-37-000-004).
(c) FOR 6271CM
- Remove the access panel 675BB (Ref. TASK 57-51-37-000-004).
(d) FOR 6233CM
- Remove the access panel 575FB (Ref. TASK 57-51-37-000-004).
(e) FOR 6283CM
- Remove the access panel 675FB (Ref. TASK 57-51-37-000-004).



EFF :
ALL
 27-54-00


R 
AIJ




Page 676
Nov 01/10

4. Procedure
_________
(Ref. Fig. 618/TASK 27-54-00-991-045, 619/TASK 27-54-00-991-046, 620/TASK
27-54-00-991-047)
CAUTION : DO NOT GET SEMI-FLUID LUBRICANT ON PLASTIC OR RUBBER MATERIALS.
_______
SEMI-FLUID LUBRICANT CAN CAUSE DAMAGE TO THE SURFACE. REMOVE
UNWANTED SEMI-FLUID LUBRICANT WITH A LINT FREE CLOTH.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-00-612-050
A. Filling procedure for the Flap Actuators:
- Flap actuator No.1 6205CM (6255CM)
- Flap actuator No.2 6211CM (6261CM)
- Flap actuator No.3 6221CM (6271CM)
- Flap actuator No.4 6233CM (6283CM)
(1) Fill the flap actuator No.1 6205CM (6255CM) with the clean COMMON
GREASE (Material No. 04-025) as follows:
(a) Use a clean lint-free cloth MISCELLANEOUS (Material No. 19-003)
and the CLEANING AGENTS (Material No. 11-026) to clean:
- The area around the vent plug (1)
- The area around the drain plug (2).
(b) Remove the vent plug (1) from the flap actuator.
(c) Remove the drain plug (2) from the flap actuator.
NOTE : The drain plug (2) is at the bottom location of the flap
____
actuator.
(d) Use the semi-fluid measuring equipment MEASURING-EQUIPMENT,
SEMIFUID (A685064) to fill the flap actuator as follows:
1
_

Connect one end of the hose to the semi-fluid pump. Connect


the other end of the hose to the tee piece.



EFF :
ALL
 27-54-00


R 
AIJ




Page 677
Nov 01/10

Flap Actuator - Track 1


Figure 618/TASK 27-54-00-991-045



EFF :
ALL
 27-54-00



AIJ




Page 678
Aug 01/08

INTENTIONALLY BLANK



R

 27-54-00



AIJ




Page 679
Aug 01/08

Flap Actuators - Tracks 2 thru 4


Figure 619/TASK 27-54-00-991-046- 13 (SHEET 1)



EFF :
ALL
 27-54-00



AIJ




Page 680
Aug 01/08

Flap Actuators - Tracks 2 thru 4


Figure 619/TASK 27-54-00-991-046- 23 (SHEET 2)



EFF :
ALL
 27-54-00



AIJ




Page 681
Aug 01/08

Flap Actuators - Tracks 2 thru 4


Figure 619/TASK 27-54-00-991-046- 33 (SHEET 3)



EFF :
ALL
 27-54-00



AIJ




Page 682
Aug 01/08

Flap Actuator - Semi-fluid Measuring Equipment


Figure 620/TASK 27-54-00-991-047



R
EFF :
ALL
 27-54-00



AIJ




Page 683
Aug 01/08

2
_

Fill the semi-fluid pump with the COMMON GREASE (Material No.
04-025). Bleed the semi-fluid pump before you operate it.

3
_

When you have bled the semi-fluid pump, record the volume of
the remaining grease in the semi-fluid pump.

4
_

Install the tee piece and the adaptor into the hole of the
drain plug (2) of the flap actuator. Tighten the adaptor with
your hand.

(e) Operate the semi-fluid pump as follows:


1
_

Loosen the lock screw of one plunger on the semi-fluid pump.

2
_

Operate the plunger to fill the flap actuator with the COMMON
GREASE (Material No. 04-025).

3
_

If one plunger chamber is empty, tighten the plunger lock


screw and continue with the remaining plunger. Do this until
the grease comes out of the vent plug hole of the actuator.

4
_

Calculate and record the volume of grease necessary to fill


the flap actuator.

(f) Remove the semi-fluid pump, the hose, the tee piece and the
adaptor from the flap actuator.
(g) Install (but do not torque tighten) the vent plug (1) in the flap
actuator.
(h) Install (but do not torque tighten) the drain plug (2) in the
flap actuator.
(2) Do the steps (1)(a) thru (1)(h) again for the:
- Flap actuator No.2 6211CM (6261CM)
- Flap actuator No.3 6221CM (6271CM)
- Flap actuator No.4 6233CM (6283CM).
(3) Torque tighten the vent plug (1) of each flap actuator as follows:
(a) Remove the vent plug (1) from the flap actuator.
(b) Apply the jointing compound SPECIAL MATERIALS (Material No. 05115) to the mating surfaces of the vent plug (1) and the flap
actuator.



EFF :
ALL
 27-54-00


R 
AIJ




Page 684
Aug 01/08

(c) Install the vent plug (1) in the flap actuator and TORQUE the
vent plug to between 0.54 and 0.66 m.daN (47.78 and 58.40
lbf.in).
(4) Torque tighten the drain plug (2) of each flap actuator as follows:
(a) Remove the drain plug (2) from the flap actuator.
(b) Apply the jointing compound SPECIAL MATERIALS (Material No. 05115) to the mating surfaces of the drain plug (2) and the flap
actuator.
(c) Install the drain plug (2) in the flap actuator and TORQUE the
drain plug as follows:
- Flap actuator No.1 and No.2 to between 0.54 and 0.66 m.daN
(47.78 and 58.40 lbf.in)
- Flap actuator No.3 and No.4 to between 0.36 and 0.44 m.daN
(31.85 and 38.93 lbf.in).
(5) Refer to Para 4.C for the permitted volumes of grease to fill the
flap actuator(s).
Subtask 27-54-00-680-050
B. Removal Procedure for Unwanted Semi-fluid from the Flap Actuators:
- Flap actuator No.1 6205CM (6255CM)
- Flap actuator No.2 6211CM (6261CM)
- Flap actuator No.3 6221CM (6271CM)
- Flap actuator No.4 6233CM (6283CM).
(1) Operate the flaps through their full range of travel five times
(Ref. TASK 27-50-00-866-011) and (Ref. TASK 27-50-00-866-012). After
the last operation, make sure that the flaps are in the fully
extended position.
(2) Use the semi-fluid measurement equipment MEASURING-EQUIPMENT,
SEMIFUID (A685064) to remove the unwanted semi-fluid from the flap
actuator No.1 6205CM (6255CM), as follows:
(a) Remove the vent plug (1) from the flap actuator.
(b) Remove the drain plug (2) from the flap actuator.
NOTE : The drain plug (2) is at the bottom location on the flap
____
actuator.



EFF :
ALL
 27-54-00


R 
AIJ




Page 685
Aug 01/08

(c) Install the tee piece and the adaptor into the hole of the vent
plug (1) of the flap actuator. Tighten the adaptor with your
hand.
(d) Connect one end of the hose to the air pump. Connect the other
end of the hose to the tee piece.
(e) Install the remaining tee piece, adaptor and hose into the hole
of the drain plug (2) of the flap actuator. Tighten the adaptor
with your hand.
(f) Operate the air pump 15 times to put air into the flap actuator.
This will push out the unwanted semi-fluid through the drain plug
hole. Make sure that you operate the air pump handle through its
full range each time.
(g) Remove the air pump, hose, tee piece and the adaptor from the
hole of vent plug (1).
(h) Remove the hose, tee piece and the adaptor from the hole of the
drain plug (2).
(i) Install (but do not torque tighten) the vent plug (1) in the flap
actuator.
(j) Install (but do not torque tighten) the drain plug (2) in the
flap actuator.
(3) Do the steps (2)(a) thru (2)(j) again and remove the unwanted
semi-fluid from the:
- Flap actuator No.2 6211CM (6261CM)
- Flap actuator No.3 6221CM (6271CM)
- Flap actuator No.4 6233CM (6283CM).
(4) Torque tighten the vent plug (1) of each flap actuator as follows:
(a) Remove the vent plug (1) from the flap actuator.
(b) Apply the jointing compound SPECIAL MATERIALS (Material No. 05115) to the mating surfaces of the vent plug (1) and the flap
actuator.
(c) Install the vent plug (1) in the flap actuator and TORQUE the
vent plug to between 0.54 and 0.66 m.daN (47.78 and 58.40
lbf.in).



EFF :
ALL
 27-54-00


R 
AIJ




Page 686
Aug 01/08

(5) Torque tighten the drain plug (2) of each flap actuator as follows:
(a) Remove the drain plug (2) from the flap actuator.
(b) Apply the jointing compound SPECIAL MATERIALS (Material No. 05115) to the mating surfaces of the drain plug (2) and the flap
actuator.
(c) Install the drain plug (2) in the flap actuator and TORQUE the
drain plug as follows:
- Flap actuator No.1 and No.2 to between 0.54 and 0.66 m.daN
(47.78 and 58.40 lbf.in)
- Flap actuator No.3 and No.4 to between 0.36 and 0.44 m.daN
(31.85 and 38.93 lbf.in).
Subtask 27-54-00-200-051
C. Permitted Volumes of Grease
(1) Compare the quantity of grease added to the flap actuator(s) and
recorded in step 4.A.(1)(e)4_, with the maximum values shown on the
table that follows:

------------------------------------------------------------------------------| Actuator Type


|
Maximum Volume of Grease permitted (CM3)
|
------------------------------------------------------------------------------|
791C
|
320
|
|---------------------|-------------------------------------------------------|
|
792C/D
|
460
|
|---------------------|-------------------------------------------------------|
|
793C
|
660
|
|---------------------|-------------------------------------------------------|
|
794C
|
490
|
|---------------------|-------------------------------------------------------|
|
1070C
|
460
|
|---------------------|-------------------------------------------------------|
|
1071C
|
460
|
|---------------------|-------------------------------------------------------|
|
1072C/D
|
350
|
|---------------------|-------------------------------------------------------|
|
1073C
|
660
|
|---------------------|-------------------------------------------------------|
|
1074C
|
580
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-00



AIJ




Page 687
Nov 01/10

(a) If the volume of grease added to the actuator, is less than the
values in the table:
- The flap actuator is serviceable.
(b) If the volume of grease added to the actuator, is more than the
values in the table, replace the flap actuator before 1200FH:
- for the Flap Track 1 Actuator 6205CM(6255CM) (Ref. TASK 27-5449-000-001) and (Ref. TASK 27-54-49-400-001)
- for the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-5449-000-002) and (Ref. TASK 27-54-49-400-002)
- for the Flap Track 3 Actuator 6221CM(6271CM) (Ref. TASK 27-5449-000-003) and (Ref. TASK 27-54-49-400-003)
- for the Flap Track 4 Actuator 6233CM(6283CM) (Ref. TASK 27-5449-000-004) and (Ref. TASK 27-54-49-400-004).
R

Subtask 27-54-00-200-052

D. Permitted Volumes of Grease

R
R
R
R

(1) Compare the quantity of grease added to the flap actuator(s) and
recorded in step 4.A.(1)(e)4_, with the maximum values shown on the
table that follows:

R
R
R
R
R

NOTE : This subtask is only applicable for grease filled actuators


____
with these part numbers:
- 791A0000-xx, 792A0000-xx, 793A0000-xx and 794A0000-xx
- 1070B0000-xx, 1071B0000-xx, 1072A0000-xx, 1073A0000-xx and
1074A0000-xx.

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------| Actuator Type


|
Maximum Volume of Grease permitted (CM3)
|
------------------------------------------------------------------------------|
791A
|
103
|
|---------------------|-------------------------------------------------------|
|
792A
|
83
|
|---------------------|-------------------------------------------------------|
|
793A
|
72
|
|---------------------|-------------------------------------------------------|
|
794A
|
128
|
|---------------------|-------------------------------------------------------|
|
1070B
|
256
|
|---------------------|-------------------------------------------------------|
|
1071B
|
256
|
|---------------------|-------------------------------------------------------|
|
1072A
|
117
|
|---------------------|-------------------------------------------------------|



EFF :
ALL
 27-54-00



AIJ




Page 688
Aug 01/11

R
R
R
R

------------------------------------------------------------------------------| Actuator Type


|
Maximum Volume of Grease permitted (CM3)
|
------------------------------------------------------------------------------|
1073A
|
129
|
|---------------------|-------------------------------------------------------|
|
1074A
|
141
|
-------------------------------------------------------------------------------

R
R
R

(a) If the volume of grease added to the actuator, is less than the
values in the table:
- The flap actuator is serviceable.

R
R
R
R
R
R
R
R
R
R

(b) If the volume of grease added to the actuator, is more than the
values in the table, replace the flap actuator before 1200FH:
- for the Flap Track 1 Actuator 6205CM(6255CM) (Ref. TASK 27-5449-000-001) and (Ref. TASK 27-54-49-400-001)
- for the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-5449-000-002) and (Ref. TASK 27-54-49-400-002)
- for the Flap Track 3 Actuator 6221CM(6271CM) (Ref. TASK 27-5449-000-003) and (Ref. TASK 27-54-49-400-003)
- for the Flap Track 4 Actuator 6233CM(6283CM) (Ref. TASK 27-5449-000-004) and (Ref. TASK 27-54-49-400-004).
5. Close-up
________
Subtask 27-54-00-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) FOR 6205CM, 6255CM
(a) Close the applicable MLG door 734, 744 (Ref. TASK 32-12-00-410001).
(3) Install the applicable access panel:
(a) FOR 6211CM
Install the access panel 573AB (Ref. TASK 57-51-37-400-002)
(b) FOR 6261CM
Install the access panel 673AB (Ref. TASK 57-51-37-400-002)
(c) FOR 6221CM
Install the access panel 575BB (Ref. TASK 57-51-37-400-004)



EFF :
ALL
 27-54-00



AIJ




Page 689
Aug 01/11

(d) FOR 6271CM


Install the access panel 675BB (Ref. TASK 57-51-37-400-004)
(e) FOR 6233CM
Install the access panel 575FB (Ref. TASK 57-51-37-400-004)
(f) FOR 6283CM
Install the access panel 675FB (Ref. TASK 57-51-37-400-004).
(4) Remove the access platform(s).
Subtask 27-54-00-865-088
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-00-860-084
C. Put the aircraft back to its initial configuration.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the spoilers 1 thru 5 (Ref. TASK 27-60-00-866-002).
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-54-00-942-074
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-00



AIJ




Page 690
Aug 01/11

GEARBOX - RIGHT ANGLE (6203CM,6253CM) - REMOVAL/INSTALLATION


____________________________________________________________
TASK 27-54-41-000-001
Removal of the Right Angle Gearbox 6203CM,(6253CM)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the right angle gearbox 6203CM is specified.
____
The procedure for the right angle gearbox 6253CM is almost the same. Any
differences in the procedures are specified where applicable.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
98D27508625000
98D27803000000
FOR FIN 6253CM
No specific

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
1 WARNING NOTICE(S)



EFF :
ALL
 27-54-41



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-866-009
29-00-00-864-001

32-12-00-010-001
27-54-41-991-002
27-54-41-991-001
FOR FIN 6253CM
27-54-00-820-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Open the Main Gear Doors for Access
Fig. 401
Fig. 402
Adjustment of the Flap Drive System

3. __________
Job Set-up
Subtask 27-54-41-860-051
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-41-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-41



AIJ




Page 402
Nov 01/10

Subtask 27-54-41-010-050
C. Get Access
(1) Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).
R

(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the


opening of the main gear main door.
Subtask 27-54-41-860-050
D. Aircraft Maintenance Configuration
(Ref. Fig. 401/TASK 27-54-41-991-002)
(1) Depressurize the Green and Yellow hydraulic systems.
(Ref. TASK 29-00-00-864-001)
(2) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in flap track
position 1 to lock the flap transmission.
(a) FOR 6203CM
lock the left flap transmission.
(b) FOR 6253CM
lock the right flap transmission.
1
_

If you cannot install the CHECK-PIN TRACK 1-4 easily, do the


adjustment of the L/H (R/H) flap drive system (Ref. TASK 2754-00-820-001).

(3) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.



EFF :
ALL
 27-54-41



AIJ




Page 403
Feb 01/11

R
R

Installation of the Check Pin Track 1-4


Figure 401/TASK 27-54-41-991-002



EFF :
ALL
 27-54-41



AIJ




Page 404
Feb 01/07

4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-41-991-001)
Subtask 27-54-41-020-050
A. Removal of the Right Angle Gearbox 6204CM (6254CM)
(1) Disconnect the torque shaft 6202CM (6252CM) (9) as follows:
(a) Move the spring (3) and remove the pin (10).
(b) Remove the nuts (7) and the bolts (6) which connect the torque
shaft (9) to the input universal joint (5) of the right angle
gearbox (1).
(c) Disconnect the torque shaft (9) from the input universal joint
(5).
(d) Remove the input universal joint (5) from the right angle gearbox
(1).
(2) Disconnect the torque shaft 6204CM (6254CM) (11) as follows:
(a) Move the spring (3) and remove the pin (10).
(b) Remove the nuts (7) and the bolts (14) which connect the torque
shaft (11) to the input universal joint (18) of the right angle
gearbox (1).
(c) Remove the shim (15).
(d) Disconnect the torque shaft (11) from the input universal joint
(18).
(e) Remove the input universal joint (18) from the right angle
gearbox (1).
(3) Remove the right angle gearbox 6203CM (6253CM) (1) as follows:
(a) Hold the right angle gearbox (1) so that it can not fall.
(b) Remove the bolts (16) and the washers (17) which attach the right
angle gearbox (1) to the support bracket.
(c) Remove the right angle gearbox (1).



EFF :
ALL
 27-54-41


R 
AIJ




Page 405
Nov 01/10

Right Angle Gearbox


Figure 402/TASK 27-54-41-991-001


EFF :
ALL
 27-54-41


R 
AIJ




Page 406
Nov 01/10

TASK 27-54-41-400-001
Installation of the Right Angle Gearbox 6203CM,(6253CM)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
NOTE : The installation procedure for the right angle gearbox 6203CM is
____
specified. The procedure for the right angle gearbox 6253CM is almost
the same. Any differences in the procedures are specified where
applicable.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-54-41



AIJ




Page 407
Nov 01/08

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
R

98D27508625000
98D27803000000
FOR FIN 6253CM
No specific

Torque Wrench : range 0.00 to 1.20 m.daN


(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-005
R
R

Material No. 09-013


Material No. 09-019

R
Material No. 11-002
R
R

Material No. 16-021

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)



EFF :
ALL
 27-54-41



AIJ




Page 408
Nov 01/08

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
29-00-00-864-001
32-12-00-410-001
27-54-41-991-002
27-54-41-991-001
FOR FIN 6253CM
32-12-00-010-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Close the Main Gear Doors after Access
Fig. 401
Fig. 402
Open the Main Gear Doors for Access

3. __________
Job Set-up
Subtask 27-54-41-860-053
A. Aircraft Maintenance Configuration
(Ref. Fig. 401/TASK 27-54-41-991-002)
(1) Make sure that the the flaps are in the the 0 degree position
(Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the
slat/flap control lever.
(3) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001)
(4) Make sure that the CHECK-PIN TRACK 1-4 (98D27508625000) is installed
in the flap track position 1 to lock the flap transmission:
R
R

(a) FOR 6203CM


lock the left flap transmission.

R
R

(b) FOR 6253CM


lock the right flap transmission.

(5) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.



EFF :
ALL
 27-54-41



AIJ




Page 409
Nov 01/10

(6) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
(7) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main gear main door.
Subtask 27-54-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-41-991-001)
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surface of the gearbox may be moist with
this separated oil as it is not a sealed unit. However, any separated
oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-54-41-910-052
A. Preparation for the Installation
(1) Apply SEALANTS (Material No. 09-019) to the face of the right angle
gearbox 6203CM (6253CM) (1) which touches the support bracket.
(2) Make sure that the splined surfaces of the input universal joint (18)
and the shaft (5) are cleaned with CLEANING AGENTS (Material No. 11002).
(3) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joints (5) and (18).



EFF :
ALL
 27-54-41


R 
AIJ




Page 410
Nov 01/10

(4) Apply SPECIAL MATERIALS (Material No. 05-005) to the heads of the
bolts (16).
Subtask 27-54-41-420-050
B. Installation of the Right Angle Gearbox 6203CM (6253CM)
(1) Install the right angle gearbox (1) as follows:
(2) Put the right angle gearbox (1) in position on the support bracket
and attach it with the bolts (16) and the washers (17).
(3) At the bonding point, seal the bolt (16) with SEALANTS (Material No.
09-013) and apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue)
to the bonding area (Ref. TASK 20-28-00-912-004).

(4) TORQUE the bolts (16 ) to between 0.78 and 0.96 m.daN (69.02 and
84.95 lbf.in).
(5) Install the input universal joint (18) as follows:
(a) Engage the input universal joint (18) of the right angle gearbox
(1) in the input of the right angle gearbox.
(b) Install the pin (10) and safety it with the spring (3).
(6) Install the input universal joint (5) as follows:
(a) Engage the input universal joint (5) of the right angle gearbox
(1) in the input of the right angle gearbox.
(b) Install the pin (10) and safety it with the spring (3).
(7) Install the torque shaft 6204CM (6254CM) (11) as follows:
(a) Put the torque shaft (11) in position.
(b) Make sure that the flange holes of the torque shaft (11) are in
line with the flange holes of the input universal joint (18).
(c) If the flange holes are not in line turn the input universal
joint (18) as necessary to put it in line.
(d) Install the shim (15).
(e) Install the bolts (14) and the nuts (7) to attach the torque
shaft (11) to the input universal joint (18).



EFF :
ALL
 27-54-41



AIJ




Page 411
Nov 01/08

(8) Measure dimension X. If dimension X is less than 6.5 mm (0.2559 in.),


continue as follows:
(a) Remove the nuts (7) and the bolts (14).
(b) Remove the shim (15).
(c) Install the bolts (14) to connect the torque shaft (11) to the
input universal joint (18).
(d) Install the nuts (7) on the bolts (14).
(9) Make sure that you can not see the indicator groove. If you can see
the indicator groove , continue as follows:
(a) Remove the nuts (7) and the bolts (14).
(b) Install the shim (15) between the torque shaft (11) and the input
universal joint (18).
(c) Install the bolts (14) to connect the torque shaft (11) to the
input universal joint (18).
(d) Install the nuts (7) on the bolts (14).
(e) TORQUE the nuts (7) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(f) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (6) or
(14) as assembled and the nuts (7).
(10) Install the torque shaft 6202CM (6252CM) (9) as follows:
(a) Put the torque shaft (9) in position.
(b) Make sure that the flange holes of the torque shaft (9) are in
line with the flange holes of the input universal joint (5).
(11) If the flange holes of the torque shaft (9) are not in line with the
flange holes of the input universal joint (5), continue as follows:
(a) Remove the torque shaft (9) complete with the attached input
universal joint from the input of the Power Control Unit (PCU).
(b) Turn the torque shaft (9) as necessary to put it in line.



EFF :
ALL
 27-54-41



AIJ




Page 412
Feb 01/07

(c) Install the torque shaft (9) complete with the attached input
universal joint in the input of the PCU.
(12) Install the bolts (6) and the nuts (7) to attach the torque shaft (9)
to the input universal joint (5).
(13) Examine the assembly of the input universal joint (5) as follows:
(a) Measure dimension X. Dimension X must be a minimum of 6.5 mm
(0.2559 in.).
(b) Make sure that you can not see the indicator groove.
(14) If you can see the indicator groove continue as follows:
(a) Measure all the related torque shafts, universal joints and
gearboxes and refer to LIEBHERR technical data.
(15) TORQUE the nuts (7) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(16) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (6) and
the nuts (7).
Subtask 27-54-41-860-052
C. Preparation for the Test
(Ref. Fig. 401/TASK 27-54-41-991-002)
(1) Remove the CHECK-PIN TRACK 1-4 from the flap transmission,
FOR 6203CM
from the left flap transmission.
FOR 6253CM
from the right flap transmission.
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(3) Remove the warning notice(s).
Subtask 27-54-41-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-41



AIJ




Page 413
Nov 01/08

Subtask 27-54-41-710-050
E. Do the operational test of the flap system (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-41-410-050
A. Close Access
(1) Remove the access platform(s).
(2) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-41


R 
AIJ




Page 414
Feb 01/07

_____________________________________________________________________________
STEADY
BEARING ASSY (6207CM,6213CM,6215CM,6219CM,6223CM,6225CM,6229CM,6231CM,
6257CM,6263CM,6265CM,6269CM,6273CM,6275CM,6279CM...) - REMOVAL/INSTALLATION
___________________________________________________________________________
R

TASK 27-54-44-000-001
Removal of the Steady Bearings FIN 6207CM(6257CM)/6213CM(6263CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-44



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-009
27-54-45-000-004
27-54-45-000-007
R

27-54-44-991-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retraction of the Flaps on the Ground
Removal of the Torque Shaft 6208CM(6258CM)
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-44-991-001)


Subtask 27-54-44-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the landing-gear doors.
(3) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat controls.
Subtask 27-54-44-865-055
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-44-860-050
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-54-44



AIJ




Page 402
Feb 01/07

R
R

Steady Bearings - Flap Power Transmission


Figure 401/TASK 27-54-44-991-001



EFF :
ALL
 27-54-44



AIJ




Page 403
Feb 01/07

(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).


(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
Subtask 27-54-44-010-051
D. Get Access
(1) Put the access platform in position below the applicable torque
shaft.
(2) Remove the applicable torque shaft (1) (Ref. TASK 27-54-45-000-004),
(Ref. TASK 27-54-45-000-007):
- FOR 6207CM
remove the torque shaft 6208CM
- FOR 6257CM
remove the torque shaft 6258CM
- FOR 6213CM
remove the torque shaft 6214CM
- FOR 6263CM
remove the torque shaft 6264CM.
R
R

(3) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-44-020-050
A. Removal of the Steady Bearing Assembly
(1) Remove and discard the cotter pin (9).
(2) Remove the nut (10), the bolt (2) and the washers (3).
(3) Remove the nuts (6), the bolts (4) and the steady bearing (5).



EFF :
ALL
 27-54-44



AIJ




Page 404
Nov 01/08

TASK 27-54-44-400-001
Installation of the Steady Bearings FIN 6207CM(6257CM)/6213CM(6263CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-54-44



AIJ




Page 405
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------9

cotter pin

27-54-44 01 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-54-00-710-001
27-54-45-000-004
27-54-45-000-007
27-54-45-400-004
27-54-45-400-007
27-54-44-991-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Operational Test of the Flap System
Removal of the Torque Shaft 6208CM(6258CM)
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Installation of the Torque Shaft 6208CM(6258CM)
Installation of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Fig. 401



EFF :
ALL
 27-54-44



AIJ




Page 406
Aug 01/11

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-44-991-001)
Subtask 27-54-44-941-054
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the landing-gear doors.
(3) Make sure that the warning notice is on panel 114VU to tell persons
not to operate the flap/slat controls.
Subtask 27-54-44-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable torque
shaft.
(2) Make sure that the applicable torque shafts (1) are removed
(Ref. TASK 27-54-45-000-004), (Ref. TASK 27-54-45-000-007):
(a) FOR 6207CM
the torque shaft 6208CM
(b) FOR 6257CM
the torque shaft 6258CM
(c) FOR 6213CM
the torque shaft 6214CM
(d) FOR 6263CM
the torque shaft 6264CM.
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on a flap torque-shaft outboard of the removed component (Ref. TASK
27-50-00-400-003).



EFF :
ALL
 27-54-44


R 
AIJ




Page 407
Aug 01/11

Subtask 27-54-44-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-44-420-054
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Do an inspection of the component interface and/or the adjacent area.


(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.



EFF :
ALL
 27-54-44



AIJ




Page 408
Aug 01/11

Subtask 27-54-44-420-052
B. Installation of the Steady Bearing Assembly
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (5) and the structure
- the shanks of the bolts (4).
(2) Install the steady bearing (5) on the torque shaft. Attach the steady
bearing (5) to the structure with the bolts (4) and the nuts (6).
(3) Attach the steady bearing (5) to the torque shaft with the bolt (2),
the washers (3) and the nut (10).
(4) TORQUE the nuts (6) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(5) TORQUE the nut (10) to between 0.36 and 0.44 m.daN (31.85 and 38.93
lbf.in).
(6) Safety the nut (10) with a new cotter pin (9).
(7) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


bolts (2) and (4)
nuts (6) and (10)
washers (3) and the cotter pin (9)
flange of the steady bearing (5).

Subtask 27-54-44-410-051
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (1) (Ref. TASK 27-54-45-400-004),
(Ref. TASK 27-54-45-400-007):
- FOR 6207CM
install the torque shaft 6208CM
- FOR 6257CM
install the torque shaft 6258CM
- FOR 6213CM
install the torque shaft 6214CM
- FOR 6263CM
install the torque shaft 6264CM.



EFF :
ALL
 27-54-44


R 
AIJ




Page 409
Feb 01/07

Subtask 27-54-44-710-050
D. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-54-44-942-050
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-44


R 
AIJ




Page 410
Feb 01/07

TASK 27-54-44-000-002
Removal of the Steady Bearings FIN 6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-44



AIJ




Page 411
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-009
27-54-45-000-008
27-54-45-000-009
27-54-45-000-010
27-54-45-000-012
27-54-45-000-013
57-51-37-000-004
R

27-54-44-991-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retraction of the Flaps on the Ground
Removal of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Removal of Torque Shaft 6218CM(6268CM)
Removal of the Torque Shaft 6222CM(6272CM)
Removal of the Torque Shaft 6228CM(6278CM)
Removal of the Torque Shaft 6232CM(6282CM)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-44-991-001)


Subtask 27-54-44-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the landing-gear doors.
(3) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat controls.
Subtask 27-54-44-865-056
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-44



AIJ




Page 412
Feb 01/07

Subtask 27-54-44-860-051
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
Subtask 27-54-44-010-050
D. Get Access
(1) Put the access platform in position below the applicable torque
shaft.
(2) Remove the applicable torque shaft (11) (Ref. TASK 27-54-45-000-008),
(Ref. TASK 27-54-45-000-009), (Ref. TASK 27-54-45-000-010),
(Ref. TASK 27-54-45-000-012), (Ref. TASK 27-54-45-000-013):
- FOR 6215CM
remove the torque shaft 6216CM
- FOR 6225CM
remove the torque shaft 6226CM
- FOR 6265CM
remove the torque shaft 6266CM
- FOR 6275CM
remove the torque shaft 6276CM
- FOR 6219CM
remove the torque shaft 6218CM
- FOR 6269CM
remove the torque shaft 6268CM
- FOR 6223CM
remove the torque shaft 6222CM
- FOR 6273CM
remove the torque shaft 6272CM
- FOR 6229CM
remove the torque shaft 6228CM
- FOR 6279CM
remove the torque shaft 6278CM
- FOR 6231CM
remove the torque shaft 6232CM
- FOR 6281CM
remove the torque shaft 6282CM.



EFF :
ALL
 27-54-44


R 
AIJ




Page 413
Feb 01/07

(3) For steady bearings FIN 6231CM (6281CM), remove the applicable access
panel (Ref. TASK 57-51-37-000-004):
- FOR 6231CM
remove 575EB
- FOR 6281CM
remove 675EB.
R
R

(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-44-020-051
A. Removal of the Steady Bearing Assemblies
(1) Remove the nuts (13), the bolts (12) and the steady bearing (16).



EFF :
ALL
 27-54-44



AIJ




Page 414
Nov 01/08

TASK 27-54-44-400-002
Installation of the Steady Bearings FIN 6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-54-44



AIJ




Page 415
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-009
27-54-00-710-001
27-54-45-000-008
27-54-45-000-009
27-54-45-000-010
27-54-45-000-012
27-54-45-000-013
27-54-45-400-008
27-54-45-400-009
27-54-45-400-010
27-54-45-400-012
27-54-45-400-013
57-51-37-000-004
57-51-37-400-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Removal of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Removal of Torque Shaft 6218CM(6268CM)
Removal of the Torque Shaft 6222CM(6272CM)
Removal of the Torque Shaft 6228CM(6278CM)
Removal of the Torque Shaft 6232CM(6282CM)
Installation of the Torque Shafts
6216CM(6266CM)/6226CM(6276CM)
Installation of the Torque Shaft 6218CM(6268CM)
Installation of the Torque Shaft 6222CM(6272CM)
Installation of the Torque Shaft 6228CM(6278CM)
Installation of the Torque Shaft 6232CM(6282CM)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-54-44



AIJ




Page 416
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-44-991-001

Fig. 401

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-44-991-001)
Subtask 27-54-44-941-055
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the landing-gear doors.
(3) Make sure that the warning notice is on panel 114VU to tell persons
not to operate the flap/slat controls.
Subtask 27-54-44-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable torque
shaft.
(2) Make sure that the flaps are retracted fully (Ref. TASK 27-50-00-866009).
(3) Make sure that the applicable torque shaft (11) is removed (Ref. TASK
27-54-45-000-008), (Ref. TASK 27-54-45-000-009), (Ref. TASK 27-54-45000-010), (Ref. TASK 27-54-45-000-012), (Ref. TASK 27-54-45-000-013):
- FOR 6215CM
the torque shaft 6216CM
- FOR 6225CM
the torque shaft 6226CM
- FOR 6265CM
the torque shaft 6266CM
- FOR 6275CM
the torque shaft 6276CM
- FOR 6219CM
the torque shaft 6218CM
- FOR 6269CM
the torque shaft 6268CM



EFF :
ALL
 27-54-44


R 
AIJ




Page 417
Nov 01/08

- FOR
the
- FOR
the
- FOR
the
- FOR
the
- FOR
the
- FOR
the

6223CM
torque
6273CM
torque
6229CM
torque
6279CM
torque
6231CM
torque
6281CM
torque

shaft 6222CM
shaft 6272CM
shaft 6228CM
shaft 6278CM
shaft 6232CM
shaft 6282CM.

(4) Make sure that the applicable access panels 575EB (675EB) have been
removed (Ref. TASK 57-51-37-000-004).
(5) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is installed on the flap/slat control lever on panel
114VU.
R
R

(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed on the applicable torque shaft
(Ref. TASK 27-50-00-400-003).
Subtask 27-54-44-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-44-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-44



AIJ




Page 418
Nov 01/08

Subtask 27-54-44-420-055
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
Subtask 27-54-44-420-053
B. Installation of the Steady Bearing Assemblies
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (16) and the structure (15)
- the shanks of the bolts (12).
(2) Install the steady bearing (16) on the torque shaft. Attach the
steady bearing (16) to the structure with the bolts (12) and the nuts
(13). Make sure that the torque shaft is correctly engaged.
(3) TORQUE the nuts (13) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(4) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolts (12) and the nuts (13)
- the flange of the steady bearing (16).



EFF :
ALL
 27-54-44



AIJ




Page 419
Aug 01/11

Subtask 27-54-44-410-052
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (11), (Ref. TASK 27-54-45-400008), (Ref. TASK 27-54-45-400-009), (Ref. TASK 27-54-45-400-010),
(Ref. TASK 27-54-45-400-012), (Ref. TASK 27-54-45-400-013):
(a) FOR 6215CM
install the torque shaft 6216CM
(b) FOR 6225CM
install the torque shaft 6226CM
(c) FOR 6265CM
install the torque shaft 6266CM
(d) FOR 6275CM
install the torque shaft 6276CM
(e) FOR 6219CM
install the torque shaft 6218CM
(f) FOR 6269CM
install the torque shaft 6268CM
(g) FOR 6223CM
install the torque shaft 6222CM
(h) FOR 6273CM
install the torque shaft 6272CM
(i) FOR 6229CM
install the torque shaft 6228CM
(j) FOR 6279CM
install the torque shaft 6278CM
(k) FOR 6231CM
install the torque shaft 6232CM
(l) FOR 6281CM
install the torque shaft 6282CM.



EFF :
ALL
 27-54-44


R 
AIJ




Page 420
Aug 01/11

(3) For the torque shafts FIN 6231CM(6281CM), install the applicable
access panel (Ref. TASK 57-51-37-400-004):
(a) FOR 6231CM
install 575EB
(b) FOR 6281CM
install 675EB.
Subtask 27-54-44-710-051
D. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
Subtask 27-54-44-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
5. Close-up
________
Subtask 27-54-44-942-051
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-44


R 
AIJ




Page 421
Aug 01/11

____________________________________________________________________________
TORQUE
SHAFT ASSY - TRANSMISSION (6202CM,6204CM,6206CM,6208CM,6210CM,6212CM,
6214CM,6216CM,6218CM,6220CM,6222CM,6224CM,6226CM...) - REMOVAL/INSTALLATION
___________________________________________________________________________
TASK 27-54-45-000-001
Removal of the Torque Shaft 6202CM(6252CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
460005835
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
2 SLEEVE - GROUND LOCK
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-45



AIJ




Page 401
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003

R
R
R

27-50-00-866-009
32-12-00-010-001
27-54-45-991-001
27-54-45-991-002
27-54-45-991-005

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retraction of the Flaps on the Ground
Open the Main Gear Doors for Access
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-45-991-001)


Subtask 27-54-45-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
landing-gear doors.
(3) Put a warning notice in position to tell persons not to operate the
flap controls.
Subtask 27-54-45-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-45



AIJ




Page 402
Feb 01/07

R
R

Torque Shafts - Flap Power Transmission


Figure 401/TASK 27-54-45-991-001



EFF :
ALL
 27-54-45



AIJ




Page 403
Feb 01/07

Subtask 27-54-45-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-050
D. Get Access
(1) Open the MLG doors (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(3) Put the access platform in the applicable position.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 402/TASK 27-54-45-991-002, 403/TASK
27-54-45-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-050
A. Removal of the Torque Shaft 6202CM(6252CM)

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove and discard the lockwire from the nuts (101).
(3) Remove the nuts (101), the washers (103) and the U-bolt (102).
(4) Remove the nuts (4) and (8), the bolts (3) and (9) and the torque
shaft (2).



EFF :
ALL
 27-54-45



AIJ




Page 404
May 01/09

R
R

Torque Shafts - Flap Power Transmission


Figure 402/TASK 27-54-45-991-002



EFF :
ALL
 27-54-45



AIJ




Page 405
Feb 01/07

R
R

Torque Shaft - Flap Power Transmission


Figure 403/TASK 27-54-45-991-005



EFF :
ALL
 27-54-45



AIJ




Page 406
Feb 01/07

(5) Remove the universal joint (1).


(6) Remove the retaining ring (5), the pin (6) and the universal joint
(7).



EFF :
ALL
 27-54-45



AIJ




Page 407
Feb 01/07

TASK 27-54-45-400-001
Installation of the Torque Shaft 6202CM(6252CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
CAUTION : MAKE SURE THE LATCH AND HINGE OF THE COUPLING DO NOT TOUCH ADJACENT
_______
COMPONENTS OR COWL DOORS (WHEN CLOSED). DO NOT USE FORCE TO ENGAGE
THE SADDLE WASHER IN THE RECESS OF THE OTHER COUPLING HALF. DAMAGE TO
COMPONENTS CAN OCCUR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 408
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003
Material No. 19-010

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-009
27-54-00-710-001
32-12-00-010-001
32-12-00-410-001
27-54-45-991-001
27-54-45-991-002
27-54-45-991-005

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402
Fig. 403



EFF :
ALL
 27-54-45



AIJ




Page 409
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-077
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the landing-gear doors.
(3) Make sure that the warning notice is in position to tell persons not
to operate the flap controls.
Subtask 27-54-45-860-063
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever on panel 114VU.
(3) Make sure that the MLG are open (Ref. TASK 32-12-00-010-001).
R

(4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(5) Make sure that the access platform is in the applicable position.

(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45



AIJ




Page 410
May 01/09

Subtask 27-54-45-865-059
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-45-991-002, 403/TASK 27-54-45-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-063
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (4), (8) and (101)
- the washers (103)
- the bolts (3) and (9)
- the flanges of the universal joints (1) and (7)
- the flanges of the shaft (2).
(2) Dry the parts.
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page 411
Nov 01/09

(3) Do an inspection of the component interface and/or the adjacent area.


R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-050
B. Installation of the Torque Shaft 6202CM(6052CM)
(1) Put the retaining ring (5) temporarily in position on the shaft of
the universal joint (7).
(2) Install the universal joint (7) in the end of the right-angle
gear-box 6203CM(6253CM).
(3) Install the pin (6) and the retaining ring (5).
(4) Install the universal joint (1) and align its flange with the flange
of the universal joint (7).
(5) Install the torque shaft (2) and attach it with the bolts (3) and (9)
and the nuts (4) and (8).
(6) TORQUE the nuts (4) and (8) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(7) Put the U-bolt (102) and the washers (103) in position and install
and tighten the nuts (101) by hand.
(8) Measure the clearance between the U-bolt (102) and the torque shaft
(2). This must be 5 mm (0.20 in.).
(9) Safety the nuts (101) with MISCELLANEOUS (Material No. 19-010).
(10) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(11) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the flap torque
shaft (Ref. TASK 27-50-00-000-003).



EFF :
ALL
 27-54-45



AIJ




Page 412
Nov 01/09

Subtask 27-54-45-916-050
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (4), (8) and (101)
washers (103)
bolts (3) and (9)
flanges of the universal joints (1) and (7)
flanges of the torque shaft (2).

Subtask 27-54-45-865-060
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-050
E. Operational Test of the Flap System
(1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
Subtask 27-54-45-410-050
A. Close Access
(1) Remove the access platform(s).
(2) Remove the SLEEVE - GROUND LOCK from each MLG door actuator.
(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-54-45-942-050
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 413
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page 414
Nov 01/09

TASK 27-54-45-000-002
Removal of the Torque Shaft 6204CM(6254CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No specific
No specific
No specific
No specific
460005835
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.8 m (9 ft. 2 in.)
2 SLEEVE - GROUND LOCK
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 415
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
32-12-00-010-001
27-54-45-991-001
27-54-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-051
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
landing-gear doors.
(3) Put a warning notice in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-45



AIJ




Page 416
May 01/09

Subtask 27-54-45-865-051
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-051
D. Get Access
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
R

(2) Install the SLEEVE - GROUND LOCK on the applicable main gear door
actuator.
(3) Put the access platform in the applicable position.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-051
A. Removal of the Torque Shaft 6204CM(6254CM)

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove the nuts (4) and (8), the bolts (3) and (9) and the torque
shaft (2). If applicable, remove the spacers.
NOTE : Spacers between the universal joint (1), the torque shaft (2)
____
and the universal joint (7), adjust the length of the
transmission. It is possible that there are none or more than
one installed.
(3) Remove the universal joint (1).
(4) Remove the retaining ring (5), the pin (6) and the universal joint
(7).



EFF :
ALL
 27-54-45



AIJ




Page 417
May 01/09

TASK 27-54-45-400-002
Installation of the Torque Shaft 6204CM(6254CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



R
EFF :
ALL
 27-54-45



AIJ




Page 418
Nov 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-54-00-710-001
32-12-00-010-001
32-12-00-410-001
27-54-45-991-001
27-54-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Operational Test of the Flap System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-078
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.



EFF :
ALL
 27-54-45



AIJ




Page 419
Nov 01/09

(3) Make sure that the warning notice is in position to tell persons not
to operate the landing gear doors.
Subtask 27-54-45-860-064
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).
(4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(5) Make sure that the access platform is in the applicable position.
(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.
Subtask 27-54-45-865-062
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-45


R 
AIJ




Page 420
Nov 01/09

4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-064
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (4) and (8)
- the bolts (3) and (9)
- the flanges of the universal joints (1) and (7)
- the flanges of the torque shaft (2).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.

R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-54-45



AIJ




Page 421
Nov 01/09

Subtask 27-54-45-420-051
B. Installation of the Torque Shaft 6204CM(6254CM)
(1) Put the retaining ring (5) temporarily in position on the shaft of
the universal joint (7).
(2) Install the universal joint (7) to the right-angle gear box
6203CM(6253CM) and attach it with the pin (6) and the retaining ring
(5).
(3) Install the universal joint (1) and align its flange with the flange
of the universal joint (7).
(4) Install the torque shaft (2) and attach it to the universal joint (1)
with the bolts (9) and the nuts (8). Tighten the nuts (8) by hand.
NOTE : A replacement torque shaft (2) 6204CM(6254CM), has two flange
____
shims and longer bolts (9). Use these (if necessary) in the
worksteps that follow.
(5) Measure the dimension between the torque shaft (2) and the universal
joint (7).
(a) If the dimension is between 6.6 mm (0.2598 in.) and 13.25 mm
(0.5216 in.), do not install a spacer.
(b) If the dimension is between 13.26 mm (0.5220 in.) and 16.75 mm
(0.6594 in.), install one spacer 3.5 mm (0.1377 in.) thick,
between the torque shaft (2) and the universal joint (7). Use the
longer bolts.
(c) If the dimension is between 16.76 mm (0.6598 in.) and 23.5
(0.9251 in.), install two spacers, each one 3.5 mm (0.1377
thick:
- one between the torque shaft (2) and the universal joint
- one between the torque shaft (2) and the universal joint
Use the longer bolts.

mm
in.)
(1)
(7).

(6) Attach the torque shaft (2) to the universal joint (7) with the bolts
(3) and the nuts (4).
(7) TORQUE the nuts (4) and (8) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).



EFF :
ALL
 27-54-45


R 
AIJ




Page 422
Nov 01/09

(8) Make sure that:


- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(9) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-051
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (4) and (8)
bolts (3) and (9)
flanges of the universal joints (1) and (7)
flanges of the torque shaft (2).

Subtask 27-54-45-865-063
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-051
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
Subtask 27-54-45-410-051
A. Close Access
(1) Remove the access platform(s).
(2) Remove the SLEEVE - GROUND LOCK from each MLG door actuator.
(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-45


R 
AIJ




Page 423
Nov 01/09

Subtask 27-54-45-942-051
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 424
Nov 01/09

TASK 27-54-45-000-003
Removal of the Torque Shaft 6206CM(6256CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
460005835
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.8 m (9 ft. 2 in.)
2 SLEEVE - GROUND LOCK
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45


R 
AIJ




Page 425
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page 426
Nov 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
32-12-00-010-001
27-54-45-991-001
27-54-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
landing-gear doors.
(3) Put a warning notice in position to tell persons not to operate the
flap controls.
Subtask 27-54-45-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-45



AIJ




Page 427
May 01/09

Subtask 27-54-45-865-052
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-052
D. Get Access
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
R

(2) Install the SLEEVE - GROUND LOCK on the applicable main gear door
actuator.
(3) Put the access platform in the applicable position.
(4) Remove the applicable access panel:
- FOR 6206CM
remove 571AB
- FOR 6256CM
remove 671AB.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-052
A. Removal of the Torque Shaft 6206CM(6256CM)

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove the retaining ring (20) and the pin (13).



EFF :
ALL
 27-54-45



AIJ




Page 428
May 01/09

(3) Remove and discard the cotter pin (22).


(4) Remove the nut (21), the washer (23), the bolt (10) and the washer
(11).
(5) Remove the bolts (24) from the seal base plate (25) and from the
shroud box.
(6) Remove the bolts (19) and the nuts (18).
(7) Compress the plunging joint (15) to permit the removal of the torque
shaft (14). Remove the torque shaft (14) through the seal base plate
(25) at the inboard end of the shroud box.
(8) During the removal, hold the torque shaft (14) through the opening in
the forward face of the shroud box.
(9) Remove the retaining ring (17), the pin (16) and the plunging joint
(15).



EFF :
ALL
 27-54-45



AIJ




Page 429
Feb 01/07

TASK 27-54-45-400-003
Installation of the Torque Shaft 6206CM(6256CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 430
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------22

cotter pin

27-54-44 01 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
32-12-00-010-001
32-12-00-410-001
27-54-45-991-001
27-54-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402



EFF :
ALL
 27-54-45



AIJ




Page 431
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-079
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
(3) Make sure that the warning notice is in position to tell persons not
to operate the landing-gear doors.
Subtask 27-54-45-860-065
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).

(4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(5) Make sure that the access platform is in the applicable position.
(6) Make sure that the applicable access panel is removed:
- for 6206CM, panel 571AB
- for 6256CM, panel 671AB.

(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45



AIJ




Page 432
May 01/09

Subtask 27-54-45-865-065
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-065
R
R

A. Preparation for Installation


(1) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (18) and (21)
- the bolts (10) and (19)
- the washers (11) and (23)
- the cotter pin (22)
- the flanges of the torque shaft (14) and the plunging joint (15).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page 433
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-052
B. Installation of the Torque Shaft 6206CM(6256CM)
(1) Put the retaining ring (17) temporarily in position on the shaft of
the plunging joint (15).
(2) Install the plunging joint (15) and attach it with the pin (16) and
the retaining ring (17). Make sure that the plunging joint (15) is
fully compressed.
(3) Hold the torque shaft assembly 6208CM(6258CM).
(4) During installation, hold the torque shaft (14) through the opening
in the forward face of the shroud box.
(5) Install the torque shaft (14) through the seal base plate (25), the
shroud box, the steady bearing (12) and into the torque shaft
assembly 6208CM(6258CM).
(6) Make sure that the splines are engaged correctly and the pin holes
are aligned.
(7) Attach the torque shaft (14) with the pin (13) and the retaining ring
(20).
(8) Install the washer (11) with the bolt (10), the washer (23) and the
nut (21).
(9) TORQUE the nut (21) to between 0.36 and 0.44 m.daN (31.85 and 38.93
lbf.in).
(10) Install a new cotter pin (22).
(11) Attach the torque shaft (14) to the plunging joint (15) with the
bolts (19) and the nuts (18).



EFF :
ALL
 27-54-45



AIJ




Page 434
Nov 01/09

(12) TORQUE the nuts (18) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(13) Loosely attach the seal base plate (25) to the shroud box with the
bolts (24).
(14) Adjust the seal on the seal base plate (25) to give an equal radial
clearance and tighten the bolts (24).
(15) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-052
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (18) and (21)
bolts (10) and (19)
washers (11) and (23)
cotter pin (22)
flanges of the torque shaft (14) and the plunging joint (15).

Subtask 27-54-45-865-066
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-052
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.



EFF :
ALL
 27-54-45


R 
AIJ




Page 435
Nov 01/09

5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- FOR 6206CM
install 571AB
- FOR 6256CM
install 671AB.
(3) Remove the access platform(s).
(4) Remove the SLEEVE - GROUND LOCK from each MLG door actuator.
(5) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-54-45-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 436
Nov 01/09

TASK 27-54-45-000-004
Removal of the Torque Shaft 6208CM(6258CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.8 m (9 ft. 2 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 437
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-54-45-991-001
27-54-45-991-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
landing-gear doors.
(3) Put a warning notice in position to tell persons not to operate the
flap/slat controls.
(4) Put the access platform in the applicable position.
Subtask 27-54-45-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-45



AIJ




Page 438
May 01/09

Subtask 27-54-45-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-053
A. Removal of the Torque Shaft 6208CM(6258CM)
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove the nuts (39), the bolts (38) and the torque shaft (37).
(3) Remove the retaining ring (40), the pin (41) and the universal joint
(42).
(4) Remove the retaining ring (43), the pin (35) and the plunging joint
(36).



EFF :
ALL
 27-54-45



AIJ




Page 439
May 01/09

R
R

Torque Shafts - Flap Pwer Transmission


Figure 404/TASK 27-54-45-991-003- 12 (SHEET 1)



EFF :
ALL
 27-54-45



AIJ




Page 440
Feb 01/07

R
R

Torque Shafts - Flap Pwer Transmission


Figure 404/TASK 27-54-45-991-003- 22 (SHEET 2)



EFF :
ALL
 27-54-45



AIJ




Page 441
Feb 01/07

TASK 27-54-45-400-004
Installation of the Torque Shaft 6208CM(6258CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 442
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-45-991-001
27-54-45-991-003

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-080
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the landing-gear doors.



EFF :
ALL
 27-54-45



AIJ




Page 443
Nov 01/09

(3) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-066
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.

(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.
Subtask 27-54-45-865-069
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-45



AIJ




Page 444
May 01/09

Subtask 27-54-45-420-066
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (39)
- the bolts (38)
- the flanges of the plunging joint (36) and the torque shaft
(37)
- the flange of the universal joint (42).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.

R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-053
B. Installation of the Torque Shaft 6208CM(6258CM)
(1) Put the retaining ring (43) temporarily in position on the shaft of
the plunging joint (36).
(2) Install the plunging joint (36) in the line gear box 6259CM(6209CM),
and attach it with the pin (35) and the retaining ring (43).
(3) Put the retaining ring (40) temporarily in position on the shaft of
the universal joint (42).



EFF :
ALL
 27-54-45



AIJ




Page 445
Nov 01/09

(4) Install the universal joint (42) and attach it with the pin (41) and
the retaining ring (40).
(5) Install the torque shaft (37) and attach it with the bolts (38) and
the nuts (39).
(6) TORQUE the nuts (39) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-053
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (39)
bolts (38)
flanges of the plunging joint (36) and the torque shaft (37)
flange of the universal joint (42).

Subtask 27-54-45-865-070
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-053
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.



EFF :
ALL
 27-54-45


R 
AIJ




Page 446
Nov 01/09

5. Close-up
________
Subtask 27-54-45-942-053
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 447
Nov 01/09

TASK 27-54-45-000-005
Removal of the Torque Shaft 6210CM(6260CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3.0 m (9 ft. 10 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 448
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
57-51-37-000-002
R
27-54-45-991-001
27-54-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-054
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page 449
Nov 01/09

Subtask 27-54-45-865-054
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-054
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel (Ref. TASK 57-51-37-000-002):
- FOR 6210CM
remove 573AB
- FOR 6260CM
remove 673AB.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-054
A. Removal of the Torque Shaft 6210CM(6260CM)
R

(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove the nuts (4) and (8), the bolts (3) and (9) and the torque
shaft (2).
(3) Remove the universal joint (1).



EFF :
ALL
 27-54-45



AIJ




Page 450
May 01/09

(4) Remove the retaining ring (5), the pin (6) and the universal joint
(7).



EFF :
ALL
 27-54-45



AIJ




Page 451
Feb 01/07

TASK 27-54-45-400-005
Installation of the Torque Shaft 6210CM(6260CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 452
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
57-51-37-000-002
R
57-51-37-400-002
R
27-54-45-991-001
27-54-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Fig. 401
Fig. 402



EFF :
ALL
 27-54-45



AIJ




Page 453
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-081
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-067
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable access panel is removed (Ref. TASK 5751-37-000-002):
- for 6210CM, panel 573AB
- for 6260CM, panel 673AB.

(5) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45



AIJ




Page 454
May 01/09

Subtask 27-54-45-865-071
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-067
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (4) and (8)
- the bolts (3) and (9)
- the flanges of the universal joints (1) and (7)
- the flanges of the torque shaft (2).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page 455
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-054
B. Installation of the Torque Shaft 6210CM(6260CM)
(1) Put the retaining ring (5) temporarily in position on the shaft of
the universal joint (7).
(2) Install the universal joint (7) in the line gear box 6209CM(6259CM),
and attach it with the pin (6) and the retaining ring (5).
(3) Install the universal joint (1) and align its flange with the flange
of the universal joint (7).
(4) Install the torque shaft (2) and attach it with the bolts (3) and (9)
and the nuts (4) and (8).
(5) TORQUE the nuts (4) and (8) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(6) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-054
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (4) and (8)
bolts (3) and (9)
flanges of the universal joints (1) and (7)
flanges of the torque shaft (2).



EFF :
ALL
 27-54-45



AIJ




Page 456
Nov 01/09

Subtask 27-54-45-865-072
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-054
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-054
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel (Ref. TASK 57-51-37-400-002):
- FOR 6210CM
install 573AB
- FOR 6260CM
install 673AB.
Subtask 27-54-45-942-054
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).



EFF :
ALL
 27-54-45


R 
AIJ




Page 457
Nov 01/09

(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 458
Nov 01/09

TASK 27-54-45-000-006
Removal of the Torque Shaft 6212CM(6262CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3.0 m (9 ft. 10 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 459
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-54-45-000-007
57-51-37-000-002
R
27-54-45-991-001
27-54-45-991-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-074
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-055
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page 460
Nov 01/09

Subtask 27-54-45-865-101
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-061
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel (Ref. TASK 57-51-37-000-002):
- FOR 6212CM
remove 573BB
- FOR 6262CM
remove 673BB.
(3) Remove the torque shaft 6214CM(6264CM) (52) (Ref. TASK 27-54-45-000007):
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-055
A. Removal of the Torque Shaft 6212CM(6262CM)
R

(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove and discard the cotter pin (49).
(3) Remove the nut (50), the washer (51), the bolt (45) and the washer
(46).
(4) Remove the torque shaft (48) through the steady bearing (47).



EFF :
ALL
 27-54-45



AIJ




Page 461
May 01/09

TASK 27-54-45-400-006
Installation of the Torque Shaft 6212CM(6262CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.5 m (8 ft. 2 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



R
EFF :
ALL
 27-54-45



AIJ




Page 462
Nov 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------49

cotter pin

27-54-44 01 -010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-45-000-007
27-54-45-400-007
57-51-37-000-002
R
57-51-37-400-002
R
27-54-45-991-001
27-54-45-991-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Installation of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Fig. 401
Fig. 404



EFF :
ALL
 27-54-45



AIJ




Page 463
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-082
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-068
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable access panel is removed (Ref. TASK 5751-37-000-002):
- for 6212CM, panel 573BB
- for 6262CM, panel 673BB.
(5) Make sure that the torque shaft(s) 6214CM(6264CM) is/are removed
(Ref. TASK 27-54-45-000-007).
(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45


R 
AIJ




Page 464
Nov 01/09

Subtask 27-54-45-865-075
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-068
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nut (50) and the bolt (45)
- the washers (46) and (51)
- the cotter pin (49).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page 465
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-055
B. Installation of the Torque Shaft 6212CM(6262CM)
(1) Install the torque shaft (48) through the steady bearing (47) and
engage it in the track 2 flap actuator.
(2) Attach the torque shaft (48) through the steady bearing (47) with the
bolt (45), the washers (46) and (51) and the nut (50).
(3) TORQUE the nut (50) to between 0.36 and 0.44 m.daN (31.85 and 38.93
lbf.in).
(4) Install a new cotter pin (49).
(5) Install the torque shaft (52) 6214CM(6264CM) (Ref. TASK 27-54-45-400007).
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00400-003).
Subtask 27-54-45-916-055
C. Application of Special Materials
(1) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


bolt (45) and the nut (50)
washers (46) and (51)
cotter pin (49).

Subtask 27-54-45-865-102
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45



AIJ




Page 466
Nov 01/09

Subtask 27-54-45-710-055
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-061
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel (Ref. TASK 57-51-37-400-002):
- FOR 6212CM
install 573BB
- FOR 6262CM
install 673BB.
Subtask 27-54-45-942-055
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 467
Nov 01/09

TASK 27-54-45-000-007
Removal of the Torque Shafts 6214CM(6264CM)/6220CM(6270CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3.0 m (9 ft. 10 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45


R 
AIJ




Page 468
Nov 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-44-000-002
27-54-45-991-001
27-54-45-991-003

Extension of the Flaps on the Ground


Removal of the Steady Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-075
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-056
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45


R 
AIJ




Page 469
Nov 01/09

Subtask 27-54-45-865-103
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-055
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel:
- FOR 6214CM
remove 573BB
- FOR 6220CM
remove 575BB
- FOR 6264CM
remove 673BB
- FOR 6270CM
remove 675BB.
(3) Remove the applicable steady bearing (56) (Ref. TASK 27-54-44-000002):
- FOR 6214CM
remove the steady bearing 6215CM
- FOR 6220CM
remove the steady bearing 6219CM
- FOR 6264CM
remove the steady bearing 6265CM
- FOR 6270CM
remove the steady bearing 6269CM.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-45


R 
AIJ




Page 470
Nov 01/09

Subtask 27-54-45-020-056
A. Removal of the Torque Shafts 6214CM(6264CM) and 6220CM(6270CM)
(1) Remove the torque shaft (52).
(2) Remove the retaining ring (54), the pin (55) and then the universal
joint (53).



EFF :
ALL
 27-54-45


R 
AIJ




Page 471
Nov 01/09

TASK 27-54-45-400-007
Installation of the Torque Shafts 6214CM(6264CM)/6220CM(6270CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-54-45



AIJ




Page 472
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-44-400-002
27-54-45-991-001
27-54-45-991-003
FOR FIN 6270CM
27-50-00-400-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Installation of the Steady Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
Fig. 401
Fig. 404
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-083
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat/flap controls.
Subtask 27-54-45-860-069
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-54-45


R 
AIJ




Page 473
Nov 01/09

(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable access panel is removed:
- for 6214CM, panel 573BB
- for 6220CM, panel 575BB
- for 6264CM, panel 673BB
- for 6270CM, panel 675BB.
(5) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on a flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
removed component.
Subtask 27-54-45-865-076
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-069
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-45



AIJ




Page 474
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-056
B. Installation of the Torque Shafts 6214CM(6264CM)/6220CM(6270CM)
(1) Put the retaining ring (54) temporarily in position on the shaft of
the universal joint (53).
(2) Install the universal joint (53) and attach it with the pin (55) and
the retaining ring (54).
(3) Install the torque shaft (52).
(4) Install the applicable steady bearing (56) (Ref. TASK 27-54-44-400002):
- FOR 6214CM
install the steady bearing 6215CM
- FOR 6220CM
install the steady bearing 6219CM
- FOR 6264CM
install the steady bearing 6265CM
- FOR 6270CM
install the steady bearing 6269CM.
(5) Make sure that:
- you cannot see the spline engagement groove on the torque shaft
(52) at the movable joints
- the dimension A is a minimum of 6.5 mm (0.2559 in.) total shaft end
float at the movable joints.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00400-003).
Subtask 27-54-45-865-078
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45



AIJ




Page 475
Nov 01/09

Subtask 27-54-45-710-056
D. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- FOR 6214CM
install 573BB
- FOR 6220CM
install 575BB
- FOR 6264CM
install 673BB
- FOR 6270CM
install 675BB.
Subtask 27-54-45-942-056
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-54-45


R 
AIJ




Page 476
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page 477
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page 478
Nov 01/09

(3) Remove the access platform(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45



AIJ




Page 479
Feb 01/07

TASK 27-54-45-000-008
Removal of the Torque Shafts 6216CM(6266CM)/6226CM(6276CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 480
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-60-00-866-002
27-54-45-991-001
27-54-45-991-003
FOR FIN 6216CM
57-51-37-000-002
R
FOR FIN 6226CM
57-51-37-000-004
FOR FIN 6266CM
57-51-37-000-002
R
FOR FIN 6276CM
57-51-37-000-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Fig. 404
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-057
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-54-45



AIJ




Page 481
Nov 01/09

(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).


R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.
Subtask 27-54-45-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-056
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel:
- FOR 6216CM
remove 573CB (Ref. TASK 57-51-37-000-002)
- FOR 6226CM
remove 575DB (Ref. TASK 57-51-37-000-004)
- FOR 6266CM
remove 673CB (Ref. TASK 57-51-37-000-002)
- FOR 6276CM
remove 675DB (Ref. TASK 57-51-37-000-004).
(3) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-45



AIJ




Page 482
May 01/09

Subtask 27-54-45-020-057
A. Removal of the Torque Shafts 6216CM(6266CM and 6226CM(6276CM)
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.
(2) Remove the nuts (59), the bolts (60) and the torque shaft (58).
(3) Remove the plunging joint (57).



EFF :
ALL
 27-54-45



AIJ




Page 483
May 01/09

TASK 27-54-45-400-008
Installation of the Torque Shafts 6216CM(6266CM)/6226CM(6276CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 484
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-60-00-866-002
57-51-37-000-002
R
57-51-37-000-004
27-54-45-991-001
27-54-45-991-003
FOR FIN 6216CM
57-51-37-400-002
R
FOR FIN 6226CM
57-51-37-400-004

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 404
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

FOR FIN 6266CM



EFF :
ALL
 27-54-45



AIJ




Page 485
Nov 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-400-002
R
FOR FIN 6276CM
57-51-37-400-004

Installation of the Access Panels 573AB(673AB),


573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-084
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat/flap controls.
Subtask 27-54-45-860-070
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(5) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-54-45



AIJ




Page 486
Nov 01/09

(6) Make sure that the applicable access


- for 6216CM, panel 573CB (Ref. TASK
- for 6226CM, panel 575DB (Ref. TASK
- for 6266CM, panel 673CB (Ref. TASK
- for 6276CM, panel 675DB (Ref. TASK

panel is removed:
57-51-37-000-002)
57-51-37-000-004)
57-51-37-000-002)
57-51-37-000-004).

(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.
Subtask 27-54-45-865-079
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-070
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (59)
- the bolts (60)
- the flanges of the universal joint (57) and the torque shaft
(58).



EFF :
ALL
 27-54-45



AIJ




Page 487
Nov 01/09

(2) Dry the parts:


WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-057
B. Installation of the Torque Shafts 6216CM(6266CM)/6226CM(6276CM)
(1) Install the plunging joint (57) and align its flange with the flange
of the steady bearing.
(2) Install the torque shaft (58) and attach it with the bolts (60) and
the nuts (59).
(3) TORQUE the nuts (59) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).



EFF :
ALL
 27-54-45



AIJ




Page 488
Nov 01/09

Subtask 27-54-45-916-056
C. Application of Special Materials
(1) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (59)
bolts (60)
flanges of the universal joint (57) and the torque shaft (58).

Subtask 27-54-45-865-080
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-057
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-056
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.



EFF :
ALL
 27-54-45


R 
AIJ




Page 489
Nov 01/09

(5) Install the applicable access panel:


- FOR 6216CM
install 573CB (Ref. TASK 57-51-37-400-002)
- FOR 6226CM
install 575DB (Ref. TASK 57-51-37-400-004)
- FOR 6266CM
install 673CB (Ref. TASK 57-51-37-400-002)
- FOR 6276CM
install 675DB (Ref. TASK 57-51-37-400-004).
Subtask 27-54-45-942-057
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page 490
Nov 01/09

TASK 27-54-45-000-009
Removal of Torque Shaft 6218CM(6268CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page 491
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-60-00-866-002
57-51-37-000-004
27-54-45-991-001
27-54-45-991-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-058
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page 492
May 01/09

Subtask 27-54-45-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-057
D. Get Access
(1) Put the access platform in the applicable position.
(2) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(3) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
(4) Remove the applicable access panels (Ref. TASK 57-51-37-000-004):
- FOR 6218CM
remove 575AB, 575BB
- FOR 6268CM
remove 675AB, 675BB.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-058
A. Removal of the Torque Shaft 6218CM(6268CM)
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.



EFF :
ALL
 27-54-45



AIJ




Page 493
May 01/09

R
R

Torque Shafts- Flap Power Transmission


Figure 405/TASK 27-54-45-991-004



EFF :
ALL
 27-54-45



AIJ




Page 494
Feb 01/07

(2) Remove the nuts (74), the bolts (73) and the torque shaft (72).
(3) Remove the nuts (76), the bolts (77) and the torque shaft (71).
(4) Remove the universal joint (75).



EFF :
ALL
 27-54-45



AIJ




Page 495
Feb 01/07

TASK 27-54-45-400-009
Installation of the Torque Shaft 6218CM(6268CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page 496
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-60-00-866-002
57-51-37-000-004
57-51-37-400-004
27-54-45-991-001
27-54-45-991-004

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 405



EFF :
ALL
 27-54-45



AIJ




Page 497
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-085
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-071
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(5) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(6) Make sure that the applicable access panels are removed (Ref. TASK
57-51-37-000-004):
- for 6218CM, panels 575AB, 575BB
- for 6268CM, panels 675AB, 675BB.

(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45



AIJ




Page 498
May 01/09

Subtask 27-54-45-865-083
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-071
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (74) and (76)
- the bolts (73) and (77)
- the flanges of the torque shafts (71) and (72)
- the flange of the universal joint (75).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page 499
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-058
B. Installation of the Torque Shaft 6218CM(6268CM)
(1) Install the universal joint (75) and align its flange with the flange
of the steady bearing.
(2) Install the torque shaft (71) and attach it with the bolts (77) and
the nuts (76).
(3) Install the torque shaft (72) and attach it with the bolts (73) and
the nuts (74).
(4) TORQUE the nuts (74) and (76) to between 1.02 and 1.24 m.daN (90.26
and 109.73 lbf.in).
(5) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-057
C. Application of Special Materials
(1) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (74) and (76)
bolts (73) and (77)
flanges of the torque shafts (71) and (72)
flange of the universal joint (75).



EFF :
ALL
 27-54-45



AIJ




Page A400
Nov 01/09

Subtask 27-54-45-865-084
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-45-710-058
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(5) Install the applicable access panel (Ref. TASK 57-51-37-400-004):
- FOR 6218CM
install 575AB, 575BB
- FOR 6268CM
install 675AB, 675BB.



EFF :
ALL
 27-54-45


R 
AIJ




Page A401
Nov 01/09

Subtask 27-54-45-942-058
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page A402
Nov 01/09

TASK 27-54-45-000-010
Removal of the Torque Shaft 6222CM(6272CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3.9 m (12 ft. 10 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page A403
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-60-00-866-002
57-51-37-000-004
27-54-45-991-001
27-54-45-991-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001, 405/TASK 27-54-45-991-004)
Subtask 27-54-45-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-059
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page A404
May 01/09

Subtask 27-54-45-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-058
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel (Ref. TASK 57-51-37-000-004):
- FOR 6222CM
remove 575CB
- FOR 6272CM
remove 675CB.
(3) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-059
A. Removal of the Torque Shaft 6222CM(6272CM)
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


torque shaft (Ref. TASK 27-50-00-400-003), outboard of the component
to be removed.
(2) Remove the nuts (80), the bolts (81) and the torque shaft (78).
(3) Remove the torque shaft (79).



EFF :
ALL
 27-54-45



AIJ




Page A405
May 01/09

TASK 27-54-45-400-010
Installation of the Torque Shaft 6222CM(6272CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



R
EFF :
ALL
 27-54-45



AIJ




Page A406
Nov 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-60-00-866-002
57-51-37-000-004
57-51-37-400-004
27-54-45-991-001
27-54-45-991-004

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 405



EFF :
ALL
 27-54-45



AIJ




Page A407
Nov 01/09

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-086
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-072
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(5) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(6) Make sure that the applicable access panel is removed (Ref. TASK 5751-37-000-004):
- for 6222CM, panel 575CB
- for 6272CM, panel 675CB.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.



EFF :
ALL
 27-54-45


R 
AIJ




Page A408
Nov 01/09

Subtask 27-54-45-865-087
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-072
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (80)
- the bolts (81)
- the flanges of the torque shaft (78) and the torsion shaft
(79).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.



EFF :
ALL
 27-54-45



AIJ




Page A409
Nov 01/09

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-059
B. Installation of the Torque Shaft 6222CM(6272CM)
(1) Install the torsion shaft (79) and align its flange with the flange
of the steady bearing.
(2) Install the torque shaft (78) and attach it with the bolts (81) and
the nuts (80).
(3) TORQUE the nuts (80) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-058
C. Application of Special Materials
(1) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (80)
bolts (81)
flanges of the torque shaft (78) and the torsion shaft (79).

Subtask 27-54-45-865-088
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45



AIJ




Page A410
Nov 01/09

Subtask 27-54-45-710-059
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(5) Install the applicable access panel (Ref. TASK 57-51-37-400-004):
- FOR 6222CM
install 575CB
- FOR 6272CM
install 675CB.
Subtask 27-54-45-942-059
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-54-45


R 
AIJ




Page A411
Nov 01/09

(3) Remove the access platform(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page A412
Nov 01/09

TASK 27-54-45-000-011
Removal of the Torque Shafts 6224CM(6274CM)/6230CM(6280CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3.0 m (9 ft. 10 in.)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45


R 
AIJ




Page A413
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page A414
Nov 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-44-000-002
27-60-00-866-002
27-54-45-991-001
27-54-45-991-004

Extension of the Flaps on the Ground


Removal of the Steady Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-076
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-060
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page A415
May 01/09

Subtask 27-54-45-865-104
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-062
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel:
- FOR 6224CM
remove 575CB
- FOR 6274CM
remove 675CB
- FOR 6230CM
remove 575EB
- FOR 6280CM
remove 675EB.
(3) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-45-991-001, 405/TASK 27-54-45-991-004)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-45



AIJ




Page A416
Feb 01/07

Subtask 27-54-45-020-060
A. Removal of the Torque Shaft 6224CM(6274CM) and 6230CM(6280CM)
(1) Remove the applicable steady bearing (82) (Ref. TASK 27-54-44-000002):
- FOR 6224CM
remove the steady bearing 6225CM
- FOR 6230CM
remove the steady bearing 6229CM
- FOR 6274CM
remove the steady bearing 6275CM
- FOR 6280CM
remove the steady bearing 6279CM.
(2) Remove the torque shaft (83).



EFF :
ALL
 27-54-45


R 
AIJ




Page A417
Feb 01/07

TASK 27-54-45-400-011
Installation of the Torque Shafts 6224CM(6274CM)/6230CM(6280CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-54-45



AIJ




Page A418
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-44-400-002
27-60-00-866-002
27-54-45-991-001
27-54-45-991-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Installation of the Steady Bearings FIN
6215CM(6265CM)/6219CM(6269CM)/6223CM
(6273CM)/6225CM(6275CM)/6229CM(6279CM)/6231CM(6281CM)
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-087
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.
Subtask 27-54-45-860-073
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.



EFF :
ALL
 27-54-45



AIJ




Page A419
May 01/09

(4) Make sure that the applicable access panels are removed:
- for 6224CM, panel 575CB
- for 6274CM, panel 675CB
- for 6230CM, panel 575EB
- for 6280CM, panel 675EB.
(5) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(6) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
R

(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.
Subtask 27-54-45-865-091
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-45



AIJ




Page A420
May 01/09

Subtask 27-54-45-420-073
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.

R
R
R

(3) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-45-420-060
B. Installation of the Torque Shafts 6224CM(6274CM)/6230CM(6280CM)
(1) Install the torque shaft (83).
(2) Install the applicable steady bearing (82) (Ref. TASK 27-54-44-400002):
- FOR 6224CM
install the steady bearing 6225CM
- FOR 6230CM
install the steady bearing 6229CM
- FOR 6274CM
install the steady bearing 6275CM
- FOR 6280CM
install the steady bearing 6279CM.
(3) Make sure that:
- you cannot see the spline engagement grooves on the shaft (83) at
the movable joints
- the dimension A is a minimum of 6.5 mm (0.2559 in.) total end float
at the movable joint.
Subtask 27-54-45-865-105
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45



AIJ




Page A421
Nov 01/09

Subtask 27-54-45-710-060
D. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(5) Install the applicable access panel:
- FOR 6224CM
install 575CB
- FOR 6274CM
install 675CB
- FOR 6230CM
install 575EB
- FOR 6280CM
install 675EB.



EFF :
ALL
 27-54-45


R 
AIJ




Page A422
Nov 01/09

Subtask 27-54-45-942-060
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page A423
Nov 01/09

TASK 27-54-45-000-012
Removal of the Torque Shaft 6228CM(6278CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27504030001
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 4.0 m (13 ft. 1 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-45



AIJ




Page A424
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-50-00-866-008
27-60-00-866-002
27-54-45-991-001
27-54-45-991-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning sign in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-061
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page A425
May 01/09

Subtask 27-54-45-865-058
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-059
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel:
- FOR 6228CM
remove 575DB, 575EB
- FOR 6278CM
remove 675DB, 675EB.
(3) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-45-991-001, 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-061
A. Removal of the Torque Shaft 6228CM(6278CM)
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on a


flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of the
component to be removed.



EFF :
ALL
 27-54-45



AIJ




Page A426
May 01/09

(2) Remove the nuts (89), the bolts (90) and the torque shaft (84).
(3) Remove the retaining ring (87) and the pin (85).
(4) Remove the torque shaft (86) and the universal joint (88).



EFF :
ALL
 27-54-45



AIJ




Page A427
Feb 01/07

TASK 27-54-45-400-012
Installation of the Torque Shaft 6228CM(6278CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page A428
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-60-00-866-002
27-54-45-991-001
27-54-45-991-004

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Fig. 405

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-088
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.



EFF :
ALL
 27-54-45



AIJ




Page A429
Nov 01/09

Subtask 27-54-45-860-074
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable access panel is removed:
- for 6228CM, panels 575DB, 575EB
- for 6278CM, panels 675DB, 675EB.
(5) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(6) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the flap torque shaft (Ref. TASK 27-50-00-400-003), outboard of
the removed component.
Subtask 27-54-45-865-092
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-45


R 
AIJ




Page A430
Nov 01/09

4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-45-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-074
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (89)
- the bolts (90)
- the flanges of the torque shafts (84) and (86).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.

R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-54-45



AIJ




Page A431
Nov 01/09

Subtask 27-54-45-420-061
B. Installation of the Torque Shaft 6228CM(6278CM)
(1) Put the retaining ring (87) temporarily in position on the shaft of
the universal joint (88).
(2) Install the universal joint (88) and align the pin hole with the
flange of the steady bearing.
(3) Install the torque shaft (86) and attach it with the pin (85) and the
retaining ring (87).
(4) Install the torque shaft (84) and attach it with the bolts (90) and
the nuts (89).
(5) TORQUE the nuts (89) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(6) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
Subtask 27-54-45-916-059
C. Application of Special Materials
(1) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (89)
bolts (90)
flanges of the torque shafts (84) and (86).

Subtask 27-54-45-865-093
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45


R 
AIJ




Page A432
Nov 01/09

Subtask 27-54-45-710-061
E. Operational Test of the Flap System
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-059
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(5) Install the applicable access panel:
- FOR 6228CM
install 575DB, 575EB
- FOR 6278CM
install 675DB, 675EB.
Subtask 27-54-45-942-061
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.


EFF :
ALL
 27-54-45


R 
AIJ




Page A433
Nov 01/09

INTENTIONALLY BLANK



R

 27-54-45



AIJ




Page A434
Nov 01/09

TASK 27-54-45-000-013
Removal of the Torque Shaft 6232CM(6282CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27604000000
98D27803000000
FOR FIN 6282CM
98D27504005000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
1 PIN RIGGING-FLAPS (TRACK 1)



EFF :
ALL
 27-54-45



AIJ




Page A435
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-60-00-866-002
57-51-37-000-004
27-54-45-991-001
27-54-45-991-003

Retraction of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-071
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap/slat controls.
Subtask 27-54-45-860-062
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.



EFF :
ALL
 27-54-45



AIJ




Page A436
May 01/09

Subtask 27-54-45-865-096
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-010-060
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panels (Ref. TASK 57-51-37-000-004).
- FOR 6232CM
remove 575FB, 575GB
- FOR 6282CM
remove 675FB, 675GB.
(3) Put the applicable spoiler in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.
Subtask 27-54-45-480-050
E. Installation of Support Equipment
(1) Get access through the applicable access-panel hole:
- FOR 6232CM
through 575GB.
- FOR 6282CM
through 675GB.
(2) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) at the flap
track 1 position only.



EFF :
ALL
 27-54-45


R 
AIJ




Page A437
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-45-991-001, 404/TASK 27-54-45-991-003)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-020-062
A. Removal of the Torque Shaft 6232CM(6282CM)
(1) Remove the nuts (59), the bolts (60) and then the torque shaft (58).
(2) Remove the universal joint (57).



EFF :
ALL
 27-54-45



AIJ




Page A438
Feb 01/07

TASK 27-54-45-400-013
Installation of the Torque Shaft 6232CM(6282CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-45



AIJ




Page A439
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-54-00-710-001
27-60-00-866-002
57-51-37-000-004
57-51-37-400-004
27-54-45-991-001
27-54-45-991-003

Retraction of the Flaps on the Ground


Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-941-089
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap/slat controls.



EFF :
ALL
 27-54-45



AIJ




Page A440
Nov 01/09

Subtask 27-54-45-860-075
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in the applicable position.
(4) Make sure that the applicable access panels are removed (Ref. TASK
57-51-37-000-004):
- for 6232CM, panels 575FB, 575GB
- for 6282CM, panels 675FB, 675GB.
(5) Make sure that the applicable spoiler is in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(6) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-54-45-865-097
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-45-480-051
D. Support Equipment
(1) Make sure that the PIN RIGGING-FLAPS (TRACK 1) is installed at the
flap track 1 position.



EFF :
ALL
 27-54-45


R 
AIJ




Page A441
Nov 01/09

4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-45-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-45-420-075
R
R

A. Preparation for Installation


(1) Clean the parts:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the nuts (59)
- the bolts (60)
- the flanges of the universal joint (57) and the torque shaft
(58).
(2) Dry the parts:
WARNING : USE A PROTECTIVE EYE SHIELD/GOGGLES WHEN YOU USE COMPRESSED
_______
AIR. DEBRIS AND/OR HIGH PRESSURE AIR CAN DAMAGE YOUR EYES.
WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
_______
GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
THIS CONDITION CAN KILL YOU.
(a) Use compressed air to dry the cleaned areas.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(5) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-54-45



AIJ




Page A442
Nov 01/09

Subtask 27-54-45-420-062
B. Installation of the Torque Shaft 6232CM(6282CM)
(1) Install the universal joint (57) and align its flange with the flange
of the steady bearing.
(2) Install the torque shaft (58) and attach it with the bolts (60) and
the nuts (59).
(3) TORQUE the nuts (59) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-54-45-916-060
C. Application of Special Materials
(1) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (59)
bolts (60)
flanges of the universal joint (57) and the torque shaft (58).

Subtask 27-54-45-080-050
D. Removal of Support Equipment
(1) Remove the PIN RIGGING-FLAPS (TRACK 1) from the track 1 position.
Subtask 27-54-45-865-098
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.



EFF :
ALL
 27-54-45


R 
AIJ




Page A443
Nov 01/09

Subtask 27-54-45-710-062
F. Operational Test of the Flap System
(1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001). Make sure that the operation of the torque shafts is
satisfactory.
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-45-991-001)
Subtask 27-54-45-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler back to the O (Operation) position
(Ref. TASK 27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.
(5) Install the applicable access panel (Ref. TASK 57-51-37-400-004):
- FOR 6232CM
install 575FB, 575GB
- FOR 6282CM
install 675FB, 675GB.
Subtask 27-54-45-942-062
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).



EFF :
ALL
 27-54-45


R 
AIJ




Page A444
Nov 01/09

(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-45


R 
AIJ




Page A445
Nov 01/09

CARRIAGE - REMOVAL/INSTALLATION
_______________________________
TASK 27-54-46-000-002
Removal of the No.1 Flap Carriage
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
460005835
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 2.4 m (7 ft. 10 in.)
2 SLEEVE - GROUND LOCK
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-46



AIJ




Page 401
Feb 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-009
27-54-61-000-001
32-12-00-010-001
57-51-33-000-001
27-54-46-991-003

Retraction of the Flaps on the Ground


Removal of the Inboard Flap
Open the Main Gear Doors for Access
Removal of the No.1 Flap Track Beam
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-46-991-003)


Subtask 27-54-46-941-058
A. Safety Precautions
(1) Put a warning notice in the cockpit to tell persons not to operate
the landing-gear doors.
(2) Put a warning notice on panel 114VU to tell persons not to operate
the flap/slat controls.
(3) Put the safety barriers in position.
Subtask 27-54-46-860-054
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Put the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001) on
the flap/slat control lever in the cockpit.
(3) Remove the safety collar from the circuit breakers 10CV and 12CV.



EFF :
ALL
 27-54-46



AIJ




Page 402
Feb 01/07

R
R

No. 1 Flap Carriage


Figure 401/TASK 27-54-46-991-003



EFF :
ALL
 27-54-46



AIJ




Page 403
Feb 01/07

Subtask 27-54-46-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-54-46-010-054
D. Get Access
(1) Open the MLG doors (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK (460005835) is on the
applicable MLG door actuating cylinder.
(3) Put the access platform in position at the flap track 1.
(4) Remove the inboard flap (Ref. TASK 27-54-61-000-001).
(5) Remove the flap track beam No.1 (Ref. TASK 57-51-33-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-46-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-020-051
A. Removal of the No.1 Flap Carriage
WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______
INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.
(1) Hold the bush (5) and remove the bolts (2) and (4).



EFF :
ALL
 27-54-46



AIJ




Page 404
Feb 01/08

(2) Remove the bush (5) from the flap track beam (3).
(3) Remove the carriaage No.1 (1) from the flap track beam (3).



EFF :
ALL
 27-54-46



AIJ




Page 405
Feb 01/07

TASK 27-54-46-400-002
Installation of the No.1 Flap Carriage
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 2.4 m (7 ft. 10 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 06-011
Material No. 11-026
Material No. 19-003

GB ABR 1-4055
SOLID FILM LUBRICANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-54-46



AIJ




Page 406
Feb 01/07

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-54-61-400-001
32-00-00-481-002

32-12-00-010-001
32-12-00-410-001
57-51-33-400-001
27-54-46-991-003

Retraction of the Flaps on the Ground


Installation of the Inboard Flap
Installation of the Safety Devices on the Landing
Gear Doors
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Installation of the No.1 Flap Track Beam
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-46-991-003)


Subtask 27-54-46-941-061
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the flap/slat controls.
(3) Make sure that the warning notice is in the cockpit to tell persons
not to operate the landing-gear doors.
Subtask 27-54-46-860-056
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is attached
to the flap/slat control lever on panel 114VU.
(3) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-46



AIJ




Page 407
Feb 01/07

(4) Make sure that the SLEEVE - GROUND LOCK is installed on each MLG door
actuating cylinder (Ref. TASK 32-00-00-481-002).
(5) Make sure that the access platform is in the applicable position.
(6) Make sure that the safety collar is removed from the circuit breakers
10CV and 12CV.
Subtask 27-54-46-865-056
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-46-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-420-054
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the carriage No.1 (1) is in the correct condition.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-46



AIJ




Page 408
Feb 01/08

Subtask 27-54-46-420-059
B. Installation of the No.1 Flap Carriage
WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______
INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.
(1) Apply LUBRICANTS (Material No. 06-011) to the smooth part of the
bolts (2) and (4).
(2) Carefully put the carriage No.1 (1) on the flap track beam (3).
(3) Install the bolts (2) and (4) together with the bush (5) on the flap
track beam (3).
(4) TORQUE the bolts (2) and (4) to between 1.4 and 2.6 m.daN (10.32 and
19.17 lbf.ft).
5. Close-up
________
Subtask 27-54-46-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the flap track beam No. 1 (Ref. TASK 57-51-33-400-001).
(3) Install the inboard flap (Ref. TASK 27-54-61-400-001).
R

(4) Remove the SLEEVE - GROUND LOCK from the MLG door actuating cylinder.
(5) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-54-46-865-057
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.



EFF :
ALL
 27-54-46



AIJ




Page 409
Feb 01/08

Subtask 27-54-46-860-063
C. Aircraft Maintenance Configuration
(1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever in the cockpit.
(2) Install the safety collar on the circuit breakers 10CV and 12CV.
Subtask 27-54-46-942-056
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-46


R 
AIJ




Page 410
Feb 01/07

TASK 27-54-46-000-001
Removal of the Nos. 2, 3 and 4 Flap Carriages
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-61-000-001
27-54-62-000-001
27-54-46-991-001

Extension of the Flaps on the Ground


Removal of the Inboard Flap
Removal of the Outboard Flap
Fig. 402



EFF :
ALL
 27-54-46



AIJ




Page 411
Feb 01/08

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-54-46-991-001)
Subtask 27-54-46-941-050
A. Safety Precautions
(1) Put the warning notice in position on the panel 114VU to tell persons
not to operate the flap/slat controls.
(2) Put the safety barriers in position.
Subtask 27-54-46-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Put the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (98D27803000000)


on the flap/slat control lever on the panel 114VU.
(3) Remove the safety collar from the circuit breakers 10CV and 12CV.
Subtask 27-54-46-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07



EFF :
ALL
 27-54-46



AIJ




Page 412
Feb 01/08

R
R

Nos. 2, 3 and 4 Flap Carriages


Figure 402/TASK 27-54-46-991-001



EFF :
ALL
 27-54-46



AIJ




Page 413
Feb 01/07

Subtask 27-54-46-010-050
D. Get Access
(1) Remove the applicable flap:
- for the No. 2 flap carriage, remove the inboard flap (Ref. TASK 2754-61-000-001)
- for the Nos. 3 and 4 flap carriages, remove the outboard flap
(Ref. TASK 27-54-62-000-001).
4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-54-46-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-020-052
A. Removal of the No. 2, 3 and 4 Flap Carriages
WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______
INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.
(1) Remove the nut (9), the washer (8) and the bolt (13).
(2) Remove the nuts (11), the washers (12) and the bolts (7).
(3) Remove the end stop (10).
(4) Remove the flap carriage (23).



EFF :
ALL
 27-54-46



AIJ




Page 414
Feb 01/07

TASK 27-54-46-400-001
Installation of the Nos 2, 3 and 4 Flap Carriages
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

plastic spatula
safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-46



AIJ




Page 415
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003
Material No. 19-010

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-61-400-001
27-54-62-400-001
27-54-46-991-001

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Operational Test of the Flap System
Installation of the Inboard Flap
Installation of the Outboard Flap
Fig. 402



EFF :
ALL
 27-54-46



AIJ




Page 416
Aug 01/11

3. __________
Job Set-up
Subtask 27-54-46-941-062
A. Safety Precautions
(1) Make sure that the warning notice is in position on the panel 114VU
to tell persons not to operate the flap/slat controls.
(2) Make sure that the safety barriers are in position
Subtask 27-54-46-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are extended fully (Ref. TASK 27-50-00-866008).
R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever on the panel
114VU.
(3) Make sure that the safety collar is removed from the circuit breakers
10CV and 12CV.
Subtask 27-54-46-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-54-46-560-050
D. Preparation of a Replacement Component
(1) Remove and discard the lockwire from the lockbolts (18).
(2) Remove the lockbolts (18) from the lockplates (19).



EFF :
ALL
 27-54-46



AIJ




Page 417
Feb 01/08

(3) Remove the lockplates (19) from the adjuster screws (14).
(4) Make sure the nuts (17) are hand tight only.
(5) Loosen the adjuster screws (14). The bearing blocks (16) must be free
to turn around the hinge bolts (15).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-46-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-420-055
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Use the plastic spatula to remove all unwanted sealant from:
- the end stop (10)
- the flap beam end-stop (10) interface.
(2) Clean the parts:
R
R

(a) Use the MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026) to clean:
- the top and bottom faces of the flap track (4)
- the flap carriage (23)
- the carriage roller greasers (6)
- the flap beam end-stop (10) interface.



EFF :
ALL
 27-54-46



AIJ




Page 418
Aug 01/11

(3) Make an inspection for the correct condition of:


- the top and bottom faces of the flap track (4)
- the flap carriage (23)
- the carriage roller greasers (6)
- the flap beam end-stop (10) interface.
(4) Make sure that the parts retained from the removed component are
clean and in the correct condition.
Subtask 27-54-46-420-053
B. Installation of the No. 2, 3 and 4 Flap Carriages
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Install the flap carriage (23) on the flap track beam (21). Make sure
that the mal-assembly bracket (20) is outboard and the bonding
contacts (24) point forward.
(2) Hold the flap carriage (23) at the forward end of the flap track beam
(21).
(3) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the mating surfaces of the end stop (10) and the
smooth part of the bolts (7) and (13).
(4) Install the end stop (10) on the flap track beam (21).
(5) Install the bolts (7), the washers (12) and the nuts (11).
(6) Install the bolt (13), the washer (8) and the nut (9).
(7) TORQUE the nuts (9) to between 2.6 and 3.0 m.daN (19.17 and 22.12
lbf.ft).
(8) TORQUE the nuts (11) to between 1.35 and 1.58 m.daN (119.46 and
139.82 lbf.in).



EFF :
ALL
 27-54-46


R 
AIJ




Page 419
Feb 01/07

R
R

(9) Use the MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026) to remove all unwanted SEALANTS (Material No.
09-018) from the end stop (10) and the flap track beam (21)
Subtask 27-54-46-820-050
C. Adjustment of the Flap Carriage Rollers
NOTE : The dimensions X and Y must be measured near the forward end
____
of the flap track (4) and away from local wear.
(1) Make sure the clearance (dimension Y) between the forward bottom
roller (5) and the flap track (4) is more than 0.05 mm (0.002 in.).
(2) Measure the clearance (dimension X) between the aft bottom roller
(3) and the flap track (4). Dimension X must be between 0.05 mm
(0.002 in.) and 0.075 mm (0.003 in.).
(3) Tighten the aft adjuster screw (14) one-eighth of a turn. The aft top
roller (2) and the aft bottom roller (3) will touch the flap track
(4).
(4) Move the flap carriage (23) along the flap track (4). The full travel
of the flap carriage (23) must be smooth.
(5) Install the lockplate (19) on the aft adjuster screw (14). One of the
holes in the lockplate (19) must align with the hole in the flap
carriage (23). If necessary, tighten the aft adjuster screw (16) to
align the holes.
(6) Install the aft lockbolt (18) through the lockplate (19).
(7) Tighten the forward adjuster screw (14) one-eighth of a turn. The
forward top roller (1) and the forward bottom roller (5) will touch
the flap track (4).
(8) Move the flap carriage (23) along the flap track (4). The full travel
of the flap carriage (23) must be smooth.
(9) Install the forward lockbolt (18) through the lockplate (19).
(10) Safety the forward and aft lockbolts (18) independently with
MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-54-46



AIJ




Page 420
Aug 01/11

Subtask 27-54-46-420-052
D. Continue the Installation of the No. 2, 3 and 4 Flap Carriages
(1) Tighten the nuts (17) and safety them independently with
MISCELLANEOUS (Material No. 19-010).
(2) If a new flap carriage (23) has been installed, make sure that the
nuts (22) are hand tight only.
NOTE : The nuts (22) are torque tightened and safetied when the flap
____
is installed.
(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolts (7) and (13), the nuts (9) and (11), the washers (8) and
(12)
- the forward lockbolt (18) and the aft adjuster screw (14)
- the hinge bolts (15) and the nuts (17).
R
R
R

(4) Lubricate the flap carriage (23) with COMMON GREASE (Material No. 04024) or COMMON GREASE (Material No. 04-004) through the carriage
roller greasers (6).
Subtask 27-54-46-410-050
E. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable flap:
- for the No. 2 carriage, the inboard flap (Ref. TASK 27-54-61-400001)
- for the Nos. 3 and 4 carriages, the outboard flap (Ref. TASK 27-5462-400-001).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-46-865-052
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.



EFF :
ALL
 27-54-46



AIJ




Page 421
Nov 01/08

Subtask 27-54-46-710-050
G. Operational Test
(1) Install the safety collar on the circuit breakers 10CV and 12CV.
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
PERSONS AND/OR DAMAGE.
(a) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(3) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-46-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-46



AIJ




Page 422
Feb 01/08

TASK 27-54-46-000-005
Removal of the Pendulum of the No. 1 Flap Track Carriage
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
AR WARNING NOTICE(S)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-46



AIJ




Page 423
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R

27-50-00-866-009
32-12-00-010-001
27-54-46-991-007

Retraction of the Flaps on the Ground


Open the Main Gear Doors for Access
Fig. 403

3. __________
Job Set-up
R
Subtask 27-54-46-941-063
A. Safety Precautions
(1) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the landing-gear doors.
(2) Put a WARNING NOTICE(S) in panel 114VU to tell persons not to operate
the flap/slat controls.
(3) Put the safety barriers in position.
Subtask 27-54-46-860-057
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Put the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER on the flap/slat
control lever in the cockpit.



EFF :
ALL
 27-54-46



AIJ




Page 424
Feb 01/11

Subtask 27-54-46-865-058
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-46-010-055
D. Get Access
(1) 0pen the applicable MLG door (Ref. TASK 32-12-00-010-001).
(2) Make sure that the SLEEVE - GROUND LOCK is installed on the
applicable MLG door actuator.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
flap track 1.
R

4. Procedure
_________

R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
R

Subtask 27-54-46-020-056

R
R

A. Removal of the Pendulum of the No.1 Flap Track Carriage


(Ref. Fig. 403/TASK 27-54-46-991-007)

R
R

WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR


_______
INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.

R
R

(1) Move the carriage (6) to get access to the bolt assembly (1) through
the access hole in the flap track beam (18).

(2) Loosen the bolt assembly (1).



EFF :
ALL
 27-54-46



AIJ




Page 425
Feb 01/11

Flap Carriage and Pendulum


Figure 403/TASK 27-54-46-991-007



EFF :
ALL
 27-54-46



AIJ




Page 426
Feb 01/11

R
R

(3) Remove the nut (9), the washer (8) and the lockplate (7) from the
bottom of the carriage (6). Discard the lockplate (7).

(4) Remove the bolt assembly (1) through the access hole.

R
R

(5) Remove the roller (4) and the washer (5) through the lower side of
the flap track beam (18).

R
R

(6) Remove the nut (11), the washer (12) and the lockplate (13) from the
lower side of the carriage (6). Discard the lockplate (13).

R
R

(7) Move the carriage as necessary and remove the bolt assembly (19)
through the access hole.

R
R

(8) Remove the roller (14) and the washer (15) through the lower side of
the flap track beam (18).

(9) Remove the retaining ring (3) and the washer (2) from the bolt (16).

R
R
R

(10) Remove the bolt (16) and the lockplate (17) from the carriage (6)
through the lower side of the flap track beam (18). Discard the
lockplate (17).

(11) Remove the pendulum (10) from the carriage (6).



EFF :
ALL
 27-54-46



AIJ




Page 427
Feb 01/11

TASK 27-54-46-400-003
Installation of the Pendulum of the No. 1 Flap Track Carriage
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


AR SAFETY BARRIER(S)

No specific
No specific

AR WARNING NOTICE(S)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)

R
R
R



EFF :
ALL
 27-54-46



AIJ




Page 428
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 05-002
Material No. 06-011
Material No. 09-013

SYNTHETIC GREASE FOR


(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE
GB ABR 1-4055
SOLID FILM LUBRICANT
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS

FLAP & SLAT MECHANISM


GENERAL PURPOSE (Ref. 20-31-00)
(Ref. 20-31-00)
TENCY (OBSOLETE) (Ref. 20-31-00)

R
Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R
R

7
7
13
13
17
17

lockplate
lockplate
lockplate
lockplate
lockplate
lockplate

27-54-46
27-54-46
27-54-46
27-54-46
27-54-46
27-54-46



EFF :
ALL
 27-54-46



AIJ




01A-030
01C-030
01A-030
01C-030
01A-140
01C-140

Page 429
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
27-50-00-866-011

Manual Extension of the Flaps

32-00-00-481-002

Installation of the Safety Devices on the Landing


Gear Doors
Open the Main Gear Doors for Access
Fig. 403

R
R

32-12-00-010-001
27-54-46-991-007
3. __________
Job Set-up

R
Subtask 27-54-46-941-064
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.


(2) Make sure that the WARNING NOTICE(S) is in the cockpit to tell
persons not to operate the flap/slat controls.
(3) Make sure that the WARNING NOTICE(S) is in the cockpit to tell
persons not to operate the landing-gear doors.
Subtask 27-54-46-860-058
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are in position 3 (Ref. TASK 27-50-00-866011).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is attached
to the flap/slat control lever on the panel 114VU.
(3) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00010-001).



EFF :
ALL
 27-54-46



AIJ




Page 430
Feb 01/11

(4) Make sure that a SLEEVE - GROUND LOCK is installed on the applicable
actuating cylinder (Ref. TASK 32-00-00-481-002).
(5) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in the
applicable position.
Subtask 27-54-46-865-060
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-420-056-A
A. Preparation for Installation
(Ref. Fig. 403/TASK 27-54-46-991-007)

(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the No.1 flap track carriage is in the correct
condition.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-46



AIJ




Page 431
Feb 01/11

(5) Make sure that the pendulum assembly is in the correct condition,
only install if:
- the pendulum assembly is of new manufacture, or
- it can be demonstrated from data records that the pendulum bearing
has not been replaced or re-swaged since new manufacture.
NOTE : Refer to AD 2009-025 for further information
____
R

Subtask 27-54-46-420-060

R
R

B. Installation of the Pendulum of the No.1 Flap Track Carriage


(Ref. Fig. 403/TASK 27-54-46-991-007)

R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL


_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R

WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR


_______
INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.

R
R
R

(1) Apply COMMON GREASE (Material No. 04-024) or COMMON GREASE (Material
No. 04-004) to the three part bearing at the top of the pendulum
(10).

(2) Put the pendulum (10) in the carriage (6).

R
R
R

(3) Apply COMMON GREASE (Material No. 04-024) or COMMON GREASE (Material
No. 04-004) to the bolt (16) and apply SEALANTS (Material No. 09-013)
to the new lockplate (17).

R
R

(4) Install the bolt (16) and the new lockplate (17) through the lower
side of the flap track beam (18).

(5) Apply SEALANTS (Material No. 09-013) to the washer (2).

(6) Install the washer (2) and the retaining ring (3) on the bolt (16).

R
R

(7) Apply SPECIAL MATERIALS (Material No. 05-002) to the shaft of the
bolt assembly (19).



EFF :
ALL
 27-54-46



AIJ




Page 432
Feb 01/11

R
R

(8) Move the carriage (6) until the access hole through the flap track
beam (18) is in line with the bolt hole in the carriage (6).

R
R
R

(9) Put the washer (15) and the roller (14) through the lower side of the
flap track beam (18), into position above the bolt hole in the
carriage (6).

R
R

(10) Install the bolt assembly (19) through the access hole in the flap
track beam (18), through the roller (14) and the washer (15).

R
R

(11) Apply SEALANTS (Material No. 09-013) to the installation surface of


the new lockplate (13).

R
R

(12) Apply LUBRICANTS (Material No. 06-011) to the thread of the bolt
(19).

R
R

(13) Install the new lockplate (13), the washer (12) and the nut (11) on
the bolt (19).

R
R

(14) Torque the nut (11) to between 4.0 and 4.6 m.daN (29.49 and 33.92
lbf.ft).

(15) Safety the nut (11) with the new lockplate (13).

R
R

(16) Apply SPECIAL MATERIALS (Material No. 05-002) to the shaft of the
bolt assembly (1).

R
R

(17) Move the carriage (6) until the access hole through the flap track
beam (18) is in line with the bolt hole in the carriage (6).

R
R
R

(18) Put the washer (5) and the roller (4) through the lower side of the
flap track beam (18), into position above the bolt hole in the
carriage (6).

R
R

(19) Install the bolt assembly (1) through the access hole in the flap
track beam (18), through the roller (4) and the washer (5).

R
R

(20) Apply SEALANTS (Material No. 09-013) to the installation surface of


the new lockplate (7).

(21) Apply LUBRICANTS (Material No. 06-011) to the thread of the bolt (1).

R
R

(22) Install the new lockplate (7), the washer (8) and the nut (9) on the
bolt (1).

R
R

(23) Torque the nut (9) to between 4.0 and 4.6 m.daN (29.49 and 33.92
lbf.ft).



EFF :
ALL
 27-54-46



AIJ




Page 433
Feb 01/11

(24) Safety the nut (9) with the new lockplate (7).

R
R
R

(25) Apply COMMON GREASE (Material No. 04-024) or COMMON GREASE (Material
No. 04-004) through the lubrication fittings on the bolts (1) and
(19).

(26) Move the carriage (6) away from the end of the flap track beam (18).
5. Close-up
________
Subtask 27-54-46-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-46-865-059
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-46-942-057
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-46



AIJ




Page 434
Feb 01/11

CARRIAGE - INSPECTION/CHECK
___________________________
R

TASK 27-54-46-200-001
Detailed Visual Inspection of the Flap Tracks and Rollers (as far as is
possible)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Refer to the MPD TASK: 275446-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


flashlight
mirror
safety barriers
warning notice
adjustable access platforms 3.5 m (11 ft. 6 in.)



EFF :
ALL
 27-54-46



AIJ




Page 601
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

12-22-27-640-004
27-50-00-866-008
27-50-00-866-009
27-60-00-866-002
32-00-00-481-002
32-12-00-010-001
32-12-00-410-001
27-54-46-991-002

Lubricate all Carriage Rollers on all Flap Tracks


Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Installation of the Safety Devices on the Landing
Gear Doors
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 601

3. __________
Job Set-up
(Ref. Fig. 601/TASK 27-54-46-991-002)
Subtask 27-54-46-941-060
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.



EFF :
ALL
 27-54-46



AIJ




Page 602
Nov 01/08

R
R

Flap Tracks 1, 2, 3 and 4


Figure 601/TASK 27-54-46-991-002



EFF :
ALL
 27-54-46



AIJ




Page 603
Feb 01/07

Subtask 27-54-46-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
Subtask 27-54-46-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-46-010-051
D. Get Access
(1) Open the applicable MLG door (Ref. TASK 32-12-00-010-001).

(2) Install the SLEEVE - GROUND LOCK (460005835) on the applicable MLG
door actuator (Ref. TASK 32-00-00-481-002).
(3) Put the Nos. 1, 2, 3, 4 and 5 spoilers to the maintenance position
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is installed on the piston
rod of each servo-control.
(5) Put the adjustable access platforms below the flap tracks 1, 2, 3 and
4.



EFF :
ALL
 27-54-46



AIJ




Page 604
Nov 01/08

4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-54-46-991-002)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-110-053
A. Preparation for Inspection
(1) Clean the parts:
(a) Use a MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the Nos. 1, 2, 3 and 4 flap carriages (2) and (4)
- the Nos. 1, 2, 3 and 4 flap tracks (1) and (3)
- the No. 1 flap carriage rollers (6) and (7)
- the Nos. 2, 3 and 4 flap carriage rollers (5), (8) and (9).
Subtask 27-54-46-210-052
B. Detailed Visual Inspection of the Flap Tracks and Rollers
(1) Do an inspection of these items for corrosion, damage and the correct
condition. Do the inspection as far as is visually possible and use a
mirror and flashlight where necessary to look at:
- the No. 1 flap carriage rollers (6) and (7)
- the Nos. 2, 3 and 4 flap carriage side-rollers (5) and the top and
bottom rollers (8) and (9)
- the Nos. 1, 2, 3 and 4 flap tracks (1) and (3)
- the attached parts and safety devices of the Nos. 1, 2, 3 and 4
flap tracks, flap track carriages and carriage rollers.
NOTE : With the flaps in this position you can see all the surfaces
____
of the flap carriage rollers (5) thru (9), and the flap tracks
(1) and (3).



EFF :
ALL
 27-54-46



AIJ




Page 605
Feb 01/07

Subtask 27-54-46-640-051
C. Lubrication
(1) Lubricate the flap track carriage-rollers (Ref. TASK 12-22-27-640004).
5. Close-up
________
Subtask 27-54-46-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R

(2) Remove the SLEEVE - GROUND LOCK from the applicable MLG door actuator
(Ref. TASK 32-00-00-481-002).
(3) Close the applicable MLG door (Ref. TASK 32-12-00-410-001).
(4) Remove the COLLAR-SAFETY, SPOILER from the piston rod of each
servo-control.
(5) Put the Nos. 1, 2, 3, 4 and 5 spoilers to the operation position
(Ref. TASK 27-60-00-866-002).
Subtask 27-54-46-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-46-860-052
C. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).



EFF :
ALL
 27-54-46



AIJ




Page 606
Nov 01/08

Subtask 27-54-46-942-053
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-46


R 
AIJ




Page 607
Feb 01/07

TASK 27-54-46-200-002
Detailed Inspection of the Flap Carriage Rollers for In-Service Wear
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

No specific
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-46



AIJ




Page 608
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 06-011
Material No. 09-013
Material No. 11-026
Material No. 19-003

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
GB ABR 1-4055
SOLID FILM LUBRICANT (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R

3
3
9
9
20

lock plates
lock plates
lock plates
lock plates
cotter pins

27-54-46
27-54-46
27-54-46
27-54-46
27-54-46

01A-030
01C-030
01A-030
01C-030
04B-110

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-22-27-640-004
20-11-11-911-001
27-54-46-400-001
27-54-46-400-002
27-54-61-000-001
27-54-61-400-001
27-54-62-000-001
27-54-62-400-001

Lubricate all Carriage Rollers on all Flap Tracks


WIRELOCKING
Installation of the Nos 2, 3 and 4 Flap Carriages
Installation of the No.1 Flap Carriage
Removal of the Inboard Flap
Installation of the Inboard Flap
Removal of the Outboard Flap
Installation of the Outboard Flap



EFF :
ALL
 27-54-46



AIJ




Page 609
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
32-00-00-481-002
32-12-00-410-001
27-54-46-991-005

Extension-Retraction of the Spoilers for Maintenance


Installation of the Safety Devices on the Landing
Gear Doors
Close the Main Gear Doors after Access
Fig. 602

3. __________
Job Set-up
(Ref. Fig. 602/TASK 27-54-46-991-005)
Subtask 27-54-46-941-065
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-54-46-860-059
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Put the Nos. 1, 2, 3, 4 and 5 spoilers to the maintenance position
(Ref. TASK 27-60-00-866-002).
(2) Remove the flaps (Ref. TASK 27-54-61-000-001), (Ref. TASK 27-54-62000-001).
(3) Put the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001) on
the flap/slat control lever in the cockpit.
(4) Remove the safety collar from the circuit breakers 10CV and 12CV.



EFF :
ALL
 27-54-46


R 
AIJ




Page 610
Feb 01/11

Subtask 27-54-46-865-061
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
(Ref. Fig. 602/TASK 27-54-46-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-46-020-054
A. Removal of Components for Inspection
(1) For the No. 1 flap carriage center rollers:
(a) Release the lock plates (9) from the nuts (7).
(b) Remove the nuts (7), the washers (8) and the lock plates (9).
Discard the lock plates (9).
(c) Remove the bolt assemblies (12), the rollers (11) and the washers
(10).
(2) For the No. 1 flap carriage side rollers:
(a) Remove the greasers (6) from the bolts (1).
(b) Remove and discard the wirelocking from the lock plates (3) and
the nuts (5).
(c) Release the lock plates (3) from the nuts (5).



EFF :
ALL
 27-54-46


R 
AIJ




Page 611
Nov 01/08

R
R

Nos. 1, 2, 3 and 4 Flap Carriages


Figure 602/TASK 27-54-46-991-005- 12 (SHEET 1)



EFF :
ALL
 27-54-46



AIJ




Page 612
Feb 01/07

R
R

Nos. 1, 2, 3 and 4 Flap Carriages


Figure 602/TASK 27-54-46-991-005- 22 (SHEET 2)



EFF :
ALL
 27-54-46



AIJ




Page 613
Feb 01/07

(d) Remove the nuts (5), the washers (4) and the lock plates (3).
Discard the lock plates (3).
(e) Remove the bolts (1), the bolt assemblies (14) and the rollers
(2).
(3) For the Nos. 2, 3 and 4 flap carriage top rollers:
(a) Remove the nuts (28), the washers (29) and the hinge pins (23).
(b) Remove the roller block assemblies (27) from the flap carriage
(30).
(4) Remove the hinge pins (25) and the rollers (26) from the roller block
assemblies (27).
(5) For the Nos. 2, 3 and 4 flap carriage side rollers:
(a) Remove the nuts (18), the washers (17), the bolt assemblies (15)
and the rollers (16).
(6) For the Nos. 2, 3 and 4 flap carriage bottom rollers:
(a) Remove the cotter pins (20) from the nuts (19). Discard the
cotter pins (20).
(b) Remove the nuts (19), the washers (21), the bolts (24) and the
rollers (22).
Subtask 27-54-46-110-054
B. Preparation for Inspection
(1) Clean the parts:
(a) Use a MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026) to clean:
- the No. 1 flap carriage rollers (2) and (11)
- the Nos. 2, 3 and 4 flap carriage rollers (16), (22) and (26).



EFF :
ALL
 27-54-46


R 
AIJ




Page 614
Nov 01/08

Subtask 27-54-46-220-050
C. Detailed Inspection of the Flap Carriage Rollers
(1) Do an inspection of these items for corrosion, damage and the correct
condition:
- the No. 1 flap carriage rollers (2) and (11)
- the Nos. 2, 3 and 4 flap carriage rollers (16), (22) and (26).
(2) Do an inspection of the flap carriage rollers (2), (11), (16), (22)
and (26) for in-service wear:
(a) Inspect the outer diameter (OD) of the roller outer case (31) for
wear marks. You must replace the applicable roller(s) if the Dim
Y is more than 0.1 mm (0.0039 in.).
(b) Hold the roller outer case (31) and move the inner case (32) from
left to right. Measure the total lateral play (Dim X). You must
replace the applicable roller(s) if the total lateral play Dim
X is more than 0.13 mm (0.0051 in.).
(c) Measure the OD of the roller(s) (Dim Z). You must replace the
applicable roller(s) if the Dim Z is less than the applicable
dimension shown in Table 1.

------------------------------------------------------------------------------|
TRACK No.
|
MINIMUM BEARING OD (DIM Z)
|
------------------------------------------------------------------------------|
TRACK 1
|
|
|-----------------------------|-----------------------------------------------|
|
SIDE ROLLER (2)
|
44.352 mm (1.746 in.)
|
|
CENTER ROLLER (11)
|
44.352 mm (1.746 in.)
|
|-----------------------------|-----------------------------------------------|
|
TRACK 2
|
|
|-----------------------------|-----------------------------------------------|
|
TOP ROLLER (26)
|
33.312 mm (1.312 in.)
|
|
SIDE ROLLER (16)
|
33.312 mm (1.312 in.)
|
|
BOTTOM ROLLER (22)
|
44.425 mm (1.749 in.)
|
|-----------------------------|-----------------------------------------------|
|
TRACK 3
|
|
|-----------------------------|-----------------------------------------------|
|
TOP ROLLER (26)
|
33.312 mm (1.312 in.)
|
|
SIDE ROLLER (16)
|
33.312 mm (1.312 in.)
|
|
BOTTOM ROLLER (22)
|
44.425 mm (1.749 in.)
|
|-----------------------------|-----------------------------------------------|
|
TRACK 4
|
|
|-----------------------------|-----------------------------------------------|
|
TOP ROLLER (26)
|
33.312 mm (1.312 in.)
|
|
SIDE ROLLER (16)
|
33.312 mm (1.312 in.)
|
|
BOTTOM ROLLER (22)
|
38.070 mm (1.499 in.)
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-46



AIJ




Page 615
Feb 01/11

TABLE 1
Subtask 27-54-46-410-054
R

D. Installation of Components After Inspection


(1) For the No. 1 flap carriage side rollers:
(a) Install the bolts (1), the bolt assemblies (14) and the rollers
(2) on the flap carriage (13).

R
R

(b) Apply SEALANTS (Material No. 09-013) to the installation surface


of the new lock plates (3).

R
R

(c) Install the new lock plates (3), the washers (4) and the nuts
(5).

(d) TORQUE the nuts (5) to between 4.0 and 4.6 m.daN (29.49 and 33.92
lbf.ft) and safety to the lock plates (3) with lockwire
(Ref. TASK 20-11-11-911-001).

R
R

(e) Install the greasers (6) on the bolts (1). Make sure that the
greasers point in the correct direction.
(2) For the No. 1 flap carriage center rollers:
(a) Install the washers (10), the rollers (11) and the bolt
assemblies (12) on the flap carriage (13).
(b) Apply a thin layer of LUBRICANTS (Material No. 06-011) to the
threads of the nuts (7).

R
R

(c) Apply SEALANTS (Material No. 09-013) to the installation surface


of the new lock plates (9).

R
R

(d) Install the new lock plates (9), the washers (8) and the nuts
(7).

(e) TORQUE the nuts (7) to between 4.0 and 4.6 m.daN (29.49 and 33.92
lbf.ft).

(f) Make sure that the lock plates (9) are installed in the correct
direction.



EFF :
ALL
 27-54-46



AIJ




Page 616
May 01/10

(3) For the Nos. 2, 3 and 4 flap carriage side rollers:


R
R
R

(a) Apply a layer of COMMON GREASE (Material No. 04-024) or COMMON


GREASE (Material No. 04-004) to the bolt assemblies (15) but not
the threads.
(b) Install the rollers (16) and the bolt assemblies (15) on the flap
carriage (30).
(c) Make sure that the greasers on the bolt assemblies (15) point in
the correct direction.
(d) Install the washers (17) and the nuts (18). TORQUE the nuts (18)
to between 5.5 and 5.7 m.daN (40.56 and 42.03 lbf.ft).
(4) For the Nos. 2, 3 and 4 flap carriage bottom rollers:

R
R
R

(a) Apply a layer of COMMON GREASE (Material No. 04-024) or COMMON


GREASE (Material No. 04-004) to the bolts (24) but not the
threads.
(b) Install the bolts (24) and the rollers (22) on the flap carriage
(30).
(c) Install the washers (21) and the nuts (19). TORQUE the nuts (19)
to between 13 and 15 m.daN (95.87 and 110.61 lbf.ft).
(d) Safety the nuts (19) with the new cotter pins (20).
(5) For the Nos. 2, 3 and 4 flap carriage top rollers:

R
R

(a) Apply a layer of COMMON GREASE (Material No. 04-024) or COMMON


GREASE (Material No. 04-004) to the pivot pins (25).
(b) Install the rollers (26) on the roller block assemblies (27) with
the pivot pins (25).
(c) Install the roller block assemblies (27) on the flap carriage
(30).

R
R
R

(d) Apply a layer of COMMON GREASE (Material No. 04-024) or COMMON


GREASE (Material No. 04-004) to the hinge pins (23) but not the
threads.
(e) Install the hinge pins (23), the washers (29) and the nuts (28).
Hand tighten the nuts (28).



EFF :
ALL
 27-54-46



AIJ




Page 617
Nov 01/08

Subtask 27-54-46-640-052
E. Lubrication
(1) Lubricate the flap track carriage rollers (Ref. TASK 12-22-27-640004).
5. Close-up
________
Subtask 27-54-46-860-062
A. Aircraft Maintenance Configuration
(1) Install the applicable flap carriage:
- for the No.1 flap carriage (Ref. TASK 27-54-46-400-002)
- for the Nos. 2, 3 and 4 flap carriages (Ref. TASK 27-54-46-400001).
(2) Install the flaps (Ref. TASK 27-54-61-400-001), (Ref. TASK 27-54-62400-001).
(3) Remove the COLLAR-SAFETY, SPOILER from the piston rod of each
servo-control.
(4) Put the Nos. 1, 2, 3, 4 and 5 spoilers to the operation position
(Ref. TASK 27-60-00-866-002).
R

(5) Remove the SLEEVE - GROUND LOCK from the applicable MLG door actuator
(Ref. TASK 32-00-00-481-002).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.
(7) Close the applicable MLG doors (Ref. TASK 32-12-00-410-001).
(8) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever in the cockpit.
Subtask 27-54-46-865-062
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.



EFF :
ALL
 27-54-46



AIJ




Page 618
Nov 01/08

Subtask 27-54-46-942-058
C. Removal of Equipment
(1) Install the safety collar on the circuit breakers 10CV and 12CV.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-46



AIJ




Page 619
Nov 01/08

LINE GEARBOX (6209CM,6259CM) - REMOVAL/INSTALLATION


___________________________________________________
R

TASK 27-54-47-000-001
Removal of the Line Gearbox 6209CM(6259CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.0 m (9 ft. 10 in.)



EFF :
ALL
 27-54-47



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-45-000-005
57-51-37-000-002
27-54-47-991-001

Extension of the Flaps on the Ground


Removal of the Torque Shaft 6210CM(6260CM)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Fig. 401

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-47-991-001)
Subtask 27-54-47-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flap controls.
Subtask 27-54-47-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the


flap/slat control lever.
Subtask 27-54-47-865-051
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-47



AIJ




Page 402
Nov 01/08

R
R

Line Gearbox
Figure 401/TASK 27-54-47-991-001



EFF :
ALL
 27-54-47



AIJ




Page 403
Feb 01/07

Subtask 27-54-47-010-050
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the applicable access panel (Ref. TASK 57-51-37-000-002):
- FOR 6209CM
remove 573AB
- FOR 6259CM
remove 673AB.
(3) Remove the applicable torque shaft that is outboard of the line
gearbox (Ref. TASK 27-54-45-000-005):
- FOR 6209CM
remove FIN 6210CM
- FOR 6259CM
remove FIN 6260CM.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-47-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-47-020-050
A. Removal of the Line Gearbox
(1) Disengage the line gearbox (1) from the torque shaft (4) as follows:
(a) Move the retaining ring (3) on to the input shaft of the line
gearbox (1), and remove the pin (2) from the torque shaft (4).
(b) Remove the bolts (7) and the washers (6).
(c) Hold the torque shaft (4) and remove the line gearbox (1) from
the mounting bracket (5) and the torque shaft (4).



EFF :
ALL
 27-54-47



AIJ




Page 404
Feb 01/07

TASK 27-54-47-400-001
Installation of the Line Gearbox 6209CM(6259CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-54-47


R 
AIJ




Page 405
Nov 01/08

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 04-022
Material No. 09-018
R
Material No. 09-019
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-50-00-866-008
27-50-00-866-009
27-54-45-000-005
27-54-45-400-005
57-51-37-000-002
57-51-37-400-002
27-54-47-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Removal of the Torque Shaft 6210CM(6260CM)
Installation of the Torque Shaft 6210CM(6260CM)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Fig. 401



EFF :
ALL
 27-54-47



AIJ




Page 406
Nov 01/08

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-47-991-001)
Subtask 27-54-47-941-053
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flap controls.
Subtask 27-54-47-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(3) Make sure that the applicable access panel is removed (Ref. TASK 5751-37-000-002):
- for the left wing, panel 573AB
- for the right wing, panel 673AB.
(4) Make sure that the applicable torque shaft that is outboard of the
line gearbox is removed (Ref. TASK 27-54-45-000-005).
Subtask 27-54-47-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-47



AIJ




Page 407
Nov 01/08

4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-47-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surfaces of the gearbox may be moist with
this separated oil as it is not a sealed unit. However, any separated
oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-54-47-420-052
A. Preparation for Installation
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do one of the steps that follow:
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
torque shaft splines.
- or



EFF :
ALL
 27-54-47


R 
AIJ




Page 408
Nov 01/08

(b) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-54-47-420-051
B. Installation of the Line Gearbox 6209CM(6259CM)
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the line gearbox (1), and the support bracket
(5), (but not at the mating faces of the bonding bolt)
- the shanks of the bolts (7), (but not the bonding bolt).
(2) Install the retaining ring (3) on the input shaft of the line gearbox
(1).
(3) Install the line gearbox (1) on the inboard torque shaft (4). Make
sure that the splines engage, with the pin holes aligned.
(4) Attach the line gearbox (1) to the support bracket (5) with the
washers (6) and the bolts (7).
(5) Electrically bond the applicable bolt (7) (Ref. TASK 20-28-00-912004):
- for the left wing, bond the aft inboard bolt (7)
- for the right wing, bond the aft outboard bolt (7).
(6) TORQUE the bolts (7) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(7) Install the pin (2) and safety it with the retaining ring (3).
(8) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
remaining bolts (7) and the washers (6).



EFF :
ALL
 27-54-47


R 
AIJ




Page 409
Nov 01/08

5. Close-up
________
(Ref. Fig. 401/TASK 27-54-47-991-001)
Subtask 27-54-47-410-050
A. Close Access
(1) Install the applicable torque shaft outboard of the line gearbox (1)
(Ref. TASK 27-54-45-400-005):
- FOR 6209CM
install 6210CM
- FOR 6259CM
install 6260CM.
(2) Install the applicable access panel (Ref. TASK 57-51-37-400-002):
- FOR 6209CM
install 573AB
- FOR 6259CM
install 673AB.
Subtask 27-54-47-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-47-860-052
C. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
Subtask 27-54-47-942-050
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-54-47



AIJ




Page 410
Nov 01/08

(3) Remove the access platform(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-47



AIJ




Page 411
Nov 01/08

BEVEL GEAR BOX (6217CM,6267CM) - REMOVAL/INSTALLATION


_____________________________________________________
TASK 27-54-48-000-001
Removal of the Bevel Gear Box 6217CM(6267CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27604000000
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning sign
access platform 3 m (9 ft. 10 in.)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-48



AIJ




Page 401
Nov 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-45-000-009
27-60-00-866-002
27-54-48-991-001
FOR FIN 6217CM
57-51-37-000-002
57-51-37-000-004
FOR FIN 6267CM
57-51-37-000-002
57-51-37-000-004

Extension of the Flaps on the Ground


Removal of Torque Shaft 6218CM(6268CM)
Extension-Retraction of the Spoilers for Maintenance
Fig. 401
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job set up
(Ref. Fig. 401/TASK 27-54-48-991-001)
Subtask 27-54-48-860-050
A. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap/slat control lever.
(3) Put the spoiler No. 1 in the Maintenance (M) position (Ref. TASK 2760-00-866-002).
(4) Put the COLLAR-SAFETY, SPOILER on the piston rod of the
servo-control.



EFF :
ALL
 27-54-48



AIJ




Page 402
Nov 01/08

R
R

Bevel Gearbox 6217CM(6267CM)


Figure 401/TASK 27-54-48-991-001



EFF :
ALL
 27-54-48



AIJ




Page 403
Feb 01/07

Subtask 27-54-48-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-54-48-941-050
C. Safety Precautions
(1) Put a warning sign on panel 114VU, to tell persons not to operate the
flap/slat controls.
(2) Put the safety barriers in position.
Subtask 27-54-48-010-050
D. Get Access
(1) Put the access platform in the applicable position.
(2) Remove the access panels:
FOR 6217CM
remove 573CB (Ref. TASK 57-51-37-000-002)
remove 575AB (Ref. TASK 57-51-37-000-004).
FOR 6267CM
remove 673CB (Ref. TASK 57-51-37-000-002)
remove 675AB (Ref. TASK 57-51-37-000-004).
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-48-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-48



AIJ




Page 404
Feb 01/07

Subtask 27-54-48-020-050
A. Removal of the Bevel Gear Box
(1) Remove the torque shaft (1) (Ref. TASK 27-54-45-000-009).
(2) Remove the bolts (4) and the washers (3) from the bevel gearbox (2).
(3) Remove the bevel gearbox (2) from the trailing edge rib and the
torque shaft (5).



EFF :
ALL
 27-54-48


R 
AIJ




Page 405
Feb 01/07

TASK 27-54-48-400-001
Installation of the Bevel Gear Box 6217CM(6267CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

warning sign
access platform 3 m (9 ft. 10 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 04-022
Material No. 09-018
R
Material No. 11-026

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-54-48



AIJ




Page 406
Nov 01/08

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 15-007
Material No. 19-003

AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-50-00-000-003
27-50-00-866-008
27-50-00-866-009
27-54-00-710-001
27-54-45-400-009
27-60-00-866-002
57-51-37-000-002
57-51-37-000-004
R

27-54-48-991-001
FOR FIN 6217CM
57-51-37-400-002
57-51-37-400-004
FOR FIN 6267CM
57-51-37-400-002
57-51-37-400-004

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Installation of the Torque Shaft 6218CM(6268CM)
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-54-48



AIJ




Page 407
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-54-48-991-001)
Subtask 27-54-48-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(3) Make sure that the spoiler No. 1 is in the M (Maintenance) position
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(5) Make sure that the warning sign is on panel 114VU, to tell persons
not to operate the flap/slat controls.
(6) Make sure that the access platform is in the applicable position.
(7) Make sure that the access panels are removed (Ref. TASK 57-51-37-000002) (Ref. TASK 57-51-37-000-004):
- for the left wing, panels 573CB, 575AB
- for the right wing, panels 673CB, 675AB.
Subtask 27-54-48-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07



EFF :
ALL
 27-54-48



AIJ




Page 408
Nov 01/08

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-48-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surfaces of the gearbox may be moist with
this separated oil as it is not a sealed unit. However, any separated
oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-54-48-210-050
A. Preparation for Installation
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the parts:
(a) Remove all the used sealant from the bevel gearbox/structure
interface with MISCELLANEOUS (Material No. 19-003) made moist
with CLEANING AGENTS (Material No. 11-026).
(b) Clean the splined connection with MISCELLANEOUS (Material No. 19003) made moist with CLEANING AGENTS (Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Apply
- the
the
- the

a layer of SEALANTS (Material No. 09-018) to:


bevel gearbox/structure interface (but not on the area around
bonding points)
shanks of the bolts (4) (but not the bonding bolt).

(4) Do one of the steps that follow:


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.



EFF :
ALL
 27-54-48



AIJ




Page 409
Feb 01/07

(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
splined connections.
- or
(b) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
splined connections.
Subtask 27-54-48-420-052
B. Installation of the Bevel Gearbox 6217CM(6267CM)
(1) Put the bevel gearbox (2) in position on to the drive shaft (5) and
the trailing edge rib.
(2) Install the washers (3) and the bolts (4) in to the bevel gearbox
(2).
(3) Electrically bond the applicable bolt (4) (Ref. TASK 20-28-00-912004).
(4) TORQUE the bolts (4) to between 0.7 and 0.8 m.daN (61.94 and 70.79
lbf.in).
(5) Install the torque shaft (1) (Ref. TASK 27-54-45-400-009).
(6) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
remaining washers (3) and the bolts (4).
Subtask 27-54-48-080-050
C. Preparation for Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the outboard flap
drive-shaft (Ref. TASK 27-50-00-000-003).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-48-865-053
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 10CV, 12CV.



EFF :
ALL
 27-54-48



AIJ




Page 410
Nov 01/08

Subtask 27-54-48-710-050
E. Operational Test of the Flap System
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
(Ref. Fig. 401/TASK 27-54-48-991-001)
Subtask 27-54-48-410-050
A. Close Access
(1) Install the applicable access panels:
FOR 6217CM
install 573CB (Ref. TASK 57-51-37-400-002)
install 575AB (Ref. TASK 57-51-37-400-004).
FOR 6267CM
install 573CB (Ref. TASK 57-51-37-400-002)
install 575AB (Ref. TASK 57-51-37-400-004).
Subtask 27-54-48-860-051
B. Aircraft Maintenance Configuration
(1) Make sure the flaps are fully retracted (Ref. TASK 27-50-00-866-009).
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Put the applicable spoiler to the O (Operation) position (Ref. TASK
27-60-00-866-002).
(4) On the servo-control, make sure that the pointer on the hex. head is
opposite the letter O (Operation) on the housing.



EFF :
ALL
 27-54-48



AIJ




Page 411
Nov 01/08

Subtask 27-54-48-942-051
C. Removal of Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-48


R 
AIJ




Page 412
Feb 01/07

_______________________________________________________________________
ACTUATOR
ASSY (6205CM,6211CM,6221CM,6233CM,6255CM,6261CM,6271CM,6283CM)
____________________
REMOVAL/INSTALLATION
TASK 27-54-49-000-008
Removal of the Flap Track 1 to 4 Actuators 6205CM(6255CM)/6211CM(6261CM)/
6221CM(6271CM)/6233CM(6283CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R

No
No
No
No

specific
specific
specific
specific

safety barriers
AR ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 CLAMPS
AR WARNING NOTICE(S)



EFF :
ALL
 27-54-49



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-51-18-000-001
27-54-49-000-001
27-54-49-000-002
27-54-49-000-003
27-54-49-000-004
27-60-00-866-002
31-32-00-860-006
32-00-00-481-001
32-12-00-010-001
53-35-11-000-001
57-51-37-000-002
R
57-51-37-000-004
27-54-49-400-001
27-54-49-400-002
27-54-49-400-003
27-54-49-400-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Removal of the Asymmetry-Position Pick-Off Unit 29CV
(30CV)
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Safety Devices on the Landing
Gears
Open the Main Gear Doors for Access
Removal of the Wing-to-Fuselage Fairings
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Flap Track 1 Actuator
6205CM(6255CM) (for corrective action)
Installation of the Flap Track 2 Actuator
6211CM(6261CM) (for corrective action)
Installation of the Flap Track 3 Actuator
6221CM(6271CM) (for corrective action)
Installation of the Flap Track 4 Actuator
6233CM(6283CM) (for corrective action)



EFF :
ALL
 27-54-49



AIJ




Page 402
Nov 01/09

3. __________
Job Set-up
Subtask 27-54-49-941-076
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S)S in position to tell persons not to operate
the flaps.

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the landing gear doors.
(4) Make sure that the the ground safety locks are installed on the
landing gear (Ref. TASK 32-00-00-481-001).
Subtask 27-54-49-860-064
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever in the cockpit.
(3) Extend the No. 1 to No. 5 spoilers (Ref. TASK 27-60-00-866-002).
(4) Make sure that a COLLAR-SAFETY, SPOILER is on the piston rod of each
servo-control.
Subtask 27-54-49-865-068
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-49



AIJ




Page 403
Nov 01/10

Subtask 27-54-49-010-063
D. Get Access
(1) Open the applicable MLG door (Ref. TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
applicable access panels.
(3) Remove the applicable access panels:
(a) For the LH wing, remove:
- 193AB, 193BB (Ref. TASK 53-35-11-000-001)
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-000-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-000-004).
(b) For the RH wing, remove:
- 194AB, 194BB (Ref. TASK 53-35-11-000-001)
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-000-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-000-004).
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-740-068
A. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).



EFF :
ALL
 27-54-49


R 
AIJ




Page 404
May 01/08

(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
2. Push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

3. Push (in) the line key SYSTEM DATA - the MCDU shows the SFCC 1 FLAP
FLP >.
SYSTEM DATA menu.
4. Push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.
NOTE : The APPU and the FPPU synchro
____
angles must agree within 1.3
deg.
The LH APPU and the RH APPU
synchro angles must agree within
0.45 deg.

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuators (Ref. TASK 27-5449-400-001), (Ref. TASK 2754-49-400-002), (Ref. TASK
27-54-49-400-003), (Ref.
TASK 27-54-49-400-004).
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.



EFF :
ALL
 27-54-49



AIJ




Page 405
Aug 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------7. De-energize the aircraft
electrical circuits (Ref. TASK 2441-00-862-002).
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-020-063
B. Preparation for Removal of the Flap Track 1 to 4 Actuators
(1) Hold the trailing edges of the inboard and outboard flaps on
supports.
R

(2) Use CLAMPS to hold the flap carriages in position.


NOTE : This is to make sure that the flap carriages do not move.
____
(3) Measure and write down the dimension A between the actuator lever
and its stop face.



EFF :
ALL
 27-54-49



AIJ




Page 406
Aug 01/11

(4) Remove the asymmetry-position pick-off unit from the flap track 4
actuator (Ref. TASK 27-51-18-000-001).
NOTE : The unit will be locked in the extended position and must not
____
be adjusted.
Subtask 27-54-49-020-062
C. Removal of the Flap Track 1 to 4 Actuators
(1) Remove the flap track 1 to 4 actuators in sequence (Ref. TASK 27-5449-000-001), (Ref. TASK 27-54-49-000-002), (Ref. TASK 27-54-49-000003) and (Ref. TASK 27-54-49-000-004).



EFF :
ALL
 27-54-49


R 
AIJ




Page 407
May 01/07

TASK 27-54-49-400-005
Installation of the Flap Track 1 to 4 Actuators 6205CM(6255CM)/6211CM(6261CM)/
6221CM(6271CM)/6233CM(6283CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific

AR ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-51-18-400-001
R

27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
27-54-49-400-001

Extension of the Flaps on the Ground


Installation of the Asymmetry-Position Pick-Off Unit
29CV (30CV)
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Installation of the Flap Track 1 Actuator
6205CM(6255CM)



EFF :
ALL
 27-54-49



AIJ




Page 408
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-49-400-002
27-54-49-400-003
27-54-49-400-004
27-60-00-866-002
32-00-00-481-001
32-12-00-010-001
32-12-00-410-001
53-35-11-000-001
53-35-11-400-001
57-51-37-000-002
57-51-37-000-004
57-51-37-400-002
57-51-37-400-004
27-54-49-991-008

Installation of the Flap Track 2 Actuator


6211CM(6261CM)
Installation of the Flap Track 3 Actuator
6221CM(6271CM)
Installation of the Flap Track 4 Actuator
6233CM(6283CM)
Extension-Retraction of the Spoilers for Maintenance
Installation of the Safety Devices on the Landing
Gears
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Wing-to-Fuselage Fairings
Installation of the Wing-to-Fuselage Fairings
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

3. __________
Job Set-up
Subtask 27-54-49-941-077
A. Safety Precautions
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that the WARNING NOTICE(S)S are in position to tell persons
not to operate the flaps.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the landing gear doors.



EFF :
ALL
 27-54-49



AIJ




Page 409
Nov 01/10

(4) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
Subtask 27-54-49-865-069
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-860-065
C. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
(3) Make sure that the No. 1 to No. 5 spoilers are fully extended
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of
each servo-control.
(5) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00010-001).
(6) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(7) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is below
the applicable access panels.
(8) Make sure that the applicable access panels are removed:
(a) For the LH wing:
- 193AB, 193BB (Ref. TASK 53-35-11-000-001)
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-000-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-000-004).



EFF :
ALL
 27-54-49


R 
AIJ




Page 410
Nov 01/10

(b) For the RH wing:


- 194AB, 194BB (Ref. TASK 53-35-11-000-001)
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-000-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-000-004).
(9) Make sure that the flap trailing edges are on supports.
(10) Make sure that the clamps hold the carriages in position.
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-420-070
R

A. Installation of the Flap Track 1 to 4 Actuators

R
R
R

CAUTION : DO A CHECK OF THE FLAP DRIVE SYSTEM AFTER YOU INSTALL A FLAP
_______
ROTARY ACTUATOR. INCORRECT ALIGNMENT CAN CAUSE A FLAP TO BECOME
LOCKED.
(Ref. Fig. 401/TASK 27-54-49-991-008)
(1) Measure the dimension A between the actuator lever and its stop
face. Make sure that the dimension is +/- 0.5 mm (0.0196 in.) of the
recorded dimension.
(a) If a dimension is incorrect, remove the applicable clamp.
(b) Pull down and hold the actuator lever to remove backlash in the
internal splines of the lever.
(c) Move the flap manually to get the correct dimension A.
(d) Install the clamp to hold the carriage in position.
(2) Install the flap track 1 to 4 actuators in sequence (Ref. TASK 27-5449-400-001), (Ref. TASK 27-54-49-400-002), (Ref. TASK 27-54-49-400003) and (Ref. TASK 27-54-49-400-004).



EFF :
ALL
 27-54-49



AIJ




Page 411
Nov 01/10

Flap Actuator Lever to Stop Face Dimensions


Figure 401/TASK 27-54-49-991-008


EFF :
ALL
 27-54-49


R 
AIJ




Page 412
May 01/07

(3) Install the asymmetry-position pick-off unit on the flap track 4


actuator (Ref. TASK 27-51-18-400-001).
Subtask 27-54-49-080-056
B. Removal of Support Equipment
(1) Remove the clamps that hold the carriages in position.
(2) Remove the supports from the flap trailing edges.
Subtask 27-54-49-740-069
C. Check of the Flap Drive System
(1) Do a check of the Flap Drive System (Ref. TASK 27-54-00-220-007).
R
R

(2) If necessary, do the adjustment of the interconnecting strut


(Ref. TASK 27-51-44-820-001).
Subtask 27-54-49-865-070
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-49-860-066
E. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of each
servo-control.
(3) Retract the No. 1 to No. 5 spoilers (Ref. TASK 27-60-00-866-002).
(4) Make sure that the applicable servo-control is in the O (operation)
position.
(5) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever in the cockpit.



EFF :
ALL
 27-54-49



AIJ




Page 413
Nov 01/10

Subtask 27-54-49-710-054
F. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-49-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) For the LH wing, install:
- 193AB, 193BB (Ref. TASK 53-35-11-400-001)
- 573AB, 573BB, 573CB (Ref. TASK 57-51-37-400-002)
- 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB (Ref. TASK 5751-37-400-004).
(b) For the RH wing, install:
- 194AB, 194BB (Ref. TASK 53-35-11-400-001)
- 673AB, 673BB, 673CB (Ref. TASK 57-51-37-400-002)
- 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB (Ref. TASK 5751-37-400-004).
(3) Close the applicable MLG door (Ref. TASK 32-12-00-410-001).
Subtask 27-54-49-942-059
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-49


R 
AIJ




Page 414
Nov 01/10

TASK 27-54-49-000-001
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R
R
R

No specific
No specific
No specific
No specific
98D27504030001

1
1
AR
1

safety barriers
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CLAMPS
WARNING NOTICE(S)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)



EFF :
ALL
 27-54-49



AIJ




Page 415
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-50-00-866-008
27-54-45-000-002
27-54-45-000-003
31-32-00-860-006
32-12-00-010-001
27-54-49-400-001
27-54-49-991-001
27-54-49-991-005
FOR FIN 6205CM
57-51-37-000-002
FOR FIN 6255CM
57-51-37-000-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Torque Shaft 6204CM(6254CM)
Removal of the Torque Shaft 6206CM(6256CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Installation of the Flap Track 1 Actuator
6205CM(6255CM) (for corrective action)
Fig. 402
Fig. 403
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-54-49-991-001, 403/TASK 27-54-49-991-005)
Subtask 27-54-49-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S) in position to tell persons not to operate
the flaps.

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the landing gear doors.



EFF :
ALL
 27-54-49



AIJ




Page 416
Aug 01/11

Flap Track 1 Actuator


Figure 402/TASK 27-54-49-991-001



EFF :
ALL
 27-54-49



AIJ




Page 417
May 01/08

Flap Rigging Pin Locations


Figure 403/TASK 27-54-49-991-005


EFF :
ALL
 27-54-49


R 
AIJ




Page 418
May 01/07

Subtask 27-54-49-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
Subtask 27-54-49-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-010-050
D. Get Access
(1) Open the applicable MLG door (Ref. TASK 32-12-00-010-001):
- for FIN 6205CM open 734
- for FIN 6255CM open 744.

(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
applicable access panel.
(3) Remove the applicable access panels:
(a) FOR 6205CM
remove 193AB, 193BB
remove 573AB, 573BB (Ref. TASK 57-51-37-000-002).
(b) FOR 6255CM
remove 194AB, 194BB
remove 673AB, 673BB (Ref. TASK 57-51-37-000-002).



EFF :
ALL
 27-54-49



AIJ




Page 419
Aug 01/11

4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-49-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-480-050
A. Installation of Support Equipment
R

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) on the applicable
torque shaft (Ref. TASK 27-50-00-400-003).
Subtask 27-54-49-740-061
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.



EFF :
ALL
 27-54-49



AIJ




Page 420
Aug 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------NOTE : The APPU and the FPPU synchro
____
angles must agree within 1.3
deg.
The LH APPU and the RH APPU
synchro angles must agree within
0.45 deg.
- write down the APPU and the FPPU
angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print-out
of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-5449-400-001).
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the aircraft
electrical circuits (Ref. TASK 2441-00-862-002).
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|



EFF :
ALL
 27-54-49


R 
AIJ




Page 421
Aug 01/11

------------------------------------------------------------------------------|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-020-057
C. Preparation for Removal of the Flap Track 1 Actuator
(1) Hold the trailing edge of the flap on supports.
R

(2) Use a CLAMPS to hold the carriage in position.


NOTE : This will make sure that the carriage does not move.
____
(3) Remove the torque shaft (1) (Ref. TASK 27-54-45-000-003). Do not
remove the plunging joint (2) from the actuator.
(4) Remove the torque shaft (4) and the universal joint (3) (Ref. TASK
27-54-45-000-002).
Subtask 27-54-49-020-064
D. Removal of the Flap Track 1 Actuator 6205CM (6255CM)
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.
(1) Remove the nuts (9) the bolts (8) and the countersunk washers (7).
(2) Turn the plunging joint (2) until the input bevel housing moves out
of the hole in the sloping frame.
(3) Remove the plunging joint (2).
(4) Remove the actuator assembly from the flap drive lever and the
aircraft.
(5) Prevent damage to the component interface and the adjacent area.



EFF :
ALL
 27-54-49



AIJ




Page 422
Aug 01/11

TASK 27-54-49-400-001
Installation of the Flap Track 1 Actuator 6205CM(6255CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
R

98D27803000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-49



AIJ




Page 423
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 16-021
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-004
24-41-00-861-002
24-41-00-862-002
27-50-00-000-003

27-50-00-866-008
27-50-00-866-009
27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
27-54-45-000-002
27-54-45-000-003
31-32-00-860-006
32-12-00-010-001
32-12-00-410-001
57-51-37-000-002

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Removal of the Torque Shaft 6204CM(6254CM)
Removal of the Torque Shaft 6206CM(6256CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)



R
EFF :
ALL
 27-54-49



AIJ




Page 424
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-400-002
27-54-49-000-001
27-54-49-991-001
FOR FIN 6205CM
27-54-45-400-002
27-54-45-400-003
FOR FIN 6255CM
27-54-45-400-002
27-54-45-400-003

Installation of the Access Panels 573AB(673AB),


573BB(673BB), 573CB(673CB) 573EB(673EB)
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
(for corrective action)
Fig. 402
Installation of the Torque Shaft 6204CM(6254CM)
Installation of the Torque Shaft 6206CM(6256CM)
Installation of the Torque Shaft 6204CM(6254CM)
Installation of the Torque Shaft 6206CM(6256CM)

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-54-49-991-001)
Subtask 27-54-49-941-067
A. Safety Precautions
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to operate the flaps.

(3) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to operate the landing gear doors.
Subtask 27-54-49-860-054
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are extended fully (Ref. TASK 27-50-00-866008).

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.



EFF :
ALL
 27-54-49



AIJ




Page 425
Aug 01/11

(3) Make sure that the applicable MLG door is open (Ref. TASK 32-12-00010-001).
(4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
R
R

(5) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is below
the applicable access panel.
(6) Make sure that the flap trailing edge is on a support.
(7) Make sure that the clamp holds the carriage in position.
(8) Make sure that the applicable access panels are removed:
(a) For the LH wing:
- panels 193AB, 193BB
- panels 573AB, 573BB (Ref. TASK 57-51-37-000-002).
(b) For the RH wing:
- panels 194AB, 194BB
- panels 673AB, 673BB (Ref. TASK 57-51-37-000-002).
(9) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the applicable torque shaft.
(10) Make sure that the torque shaft (1), the torque shaft (4) and the
universal joint (3) have been removed (Ref. TASK 27-54-45-000-003)
and (Ref. TASK 27-54-45-000-002).
Subtask 27-54-49-865-058
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



R
EFF :
ALL
 27-54-49



AIJ




Page 426
Aug 01/11

4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-49-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-560-052
A. Preparation for a Replacement Component
(1) Replacement actuator assemblies of flap track 1 are supplied in the
Right Hand (RH) configuration. To change a replacement actuator of
track 1 to a Left Hand (LH) configuration:
CAUTION : DO NOT DISENGAGE THESE ITEMS FROM THE OFFSET GEARBOX WHEN
_______
YOU CHANGE THE CONFIGURATION FROM LH TO RH :
- THE TORQUE LIMITER
- THE ROTARY ACTUATOR.
THESE ITEMS ARE NOT LRUS AND ARE NOT INTERCHANGEABLE.
(a) Remove the bolts (6) and the washers (5).
(b) Keep the mating surface of the torque limiter in contact with the
offset gearbox. Turn the input bevel housing until its arrow
aligns with the LH mark (11) on the offset gearbox case.
(c) Install the bolts (6) and the washers (5).
R
R

(d) TORQUE the bolts (6) to between 0.78 and 0.96 m.daN (69.02 and
84.95 lbf.in).
(2) Make sure that the arrow on the offset gearbox case aligns with the
mark on the rotary actuator.
NOTE : The arrow on the offset gearbox case and the mark on the
____
rotary actuator are the same for LH and RH units.
(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (6) and the washers (5).



EFF :
ALL
 27-54-49



AIJ




Page 427
Aug 01/11

Subtask 27-54-49-420-050
B. Preparation for Installation
(1) Clean the component interfaces and the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Clean
moist
- the
- the
- the
- the

these items with a MISCELLANEOUS (Material No. 19-003) made


with CLEANING AGENTS (Material No. 11-026):
internal splines of the flap drive lever
drive splines of the flap actuator
internal splines of the input bevel gearbox and torque limiter
splines of the universal joint (3) and the plunging joint (2).

(3) Do a visual inspection for the correct condition of:


- the internal splines of the flap drive lever
- the drive splines of the flap actuator
- the internal splines of the input bevel gearbox and the torque
limiter
- the splines of the universal joint (3) and the plunging joint (2).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(6) Apply
- the
- the
- the
- the

a thin layer of COMMON GREASE (Material No. 04-018) to:


splines of the universal joint (3)
plunging joint (2)
internal splines of the flap drive lever
drive splines of the actuator.

Subtask 27-54-49-420-054
C. Installation of the Flap Track 1 Actuator 6205CM(6255CM)
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.



EFF :
ALL
 27-54-49



AIJ




Page 428
Aug 01/11

CAUTION : DO A CHECK OF THE FLAP DRIVE SYSTEM AFTER YOU INSTALL A FLAP
_______
ROTARY ACTUATOR. INCORRECT ALIGNMENT CAN CAUSE A FLAP TO BECOME
LOCKED.
(1) To align the actuator:
(a) Turn the actuator drive, as necessary, and engage the actuator
drive in the flap drive lever.
(2) To install the actuator on the flap track:
(a) Put the plunging joint (2) into the torque limiter.
(b) Turn the plunging joint (2) until you can install the actuator
assembly and the bolt holes align correctly.
(c) Remove the plunging joint (2).
(3) Put a countersunk washer (7) onto each of the four bolts (8). Make
sure that the countersink is adjacent to the head of the bolt.
(4) Install one of the bolts (8) in the applicable bonding position
(Ref. TASK 20-28-00-912-004):
(a) FOR 6205CM
in the LH wing bonding position
(b) FOR 6255CM
in the RH wing bonding position.
(5) Install the remaining bolts (8) through the actuator and the flap
track.
R

(6) Install the nuts (9).

(7) TORQUE the nuts (9) in a diagonally opposite sequence to between 2.5
and 3.0 m.daN (18.43 and 22.12 lbf.ft).

(8) Do an electrical bonding check between the flap track 1 and the
applicable bolt (Ref. TASK 20-28-00-869-002):
(a) FOR 6205CM
in the LH wing bonding position
(b) FOR 6255CM
in the RH wing bonding position.



EFF :
ALL
 27-54-49



AIJ




Page 429
Aug 01/11

(9) Seal the applicable bolt (8), the countersunk washer (7) and the nut
(9) in the bonding position (Ref. TASK 20-28-00-912-004):
(a) FOR 6205CM
in the LH wing bonding position
(b) FOR 6255CM
in the RH wing bonding position.

(10) Apply a thin layer of STRUCTURE PAINTS (Material No. 16-021) when the
sealant you applied before is cured.

(11) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the


remaining bolts (8) the countersunk washers (7) and the nuts (9).

(12) Install the plunging joint (2) and the universal joint (3) so that
the flanges align with the torque shafts (1) and (4).

(13) Install the torque shafts (1) and (4):


(a) FOR 6205CM
install 6206CM (Ref. TASK 27-54-45-400-003) and 6204CM (Ref. TASK
27-54-45-400-002)
(b) FOR 6255CM
install 6256CM (Ref. TASK 27-54-45-400-003) and 6254CM (Ref. TASK
27-54-45-400-002).
Subtask 27-54-49-080-050
D. Removal of Support Equipment
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the applicable
torque shaft (Ref. TASK 27-50-00-000-003).
(2) Remove the clamp that holds the carriage in position.
(3) Remove the support from the flap trailing edge.
Subtask 27-54-49-740-074
E. Check of the Flap Drive System
(1) Do a check of the Flap Drive System (Ref. TASK 27-54-00-220-007).
(2) If necessary, do the adjustment of the interconnecting strut
(Ref. TASK 27-51-44-820-001).



EFF :
ALL
 27-54-49



AIJ




Page 430
Aug 01/11

Subtask 27-54-49-740-063
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s).


Refer to Table 1.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print out
of the screen.
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the electrical
circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-54-49



AIJ




Page 431
Aug 01/11

Subtask 27-54-49-820-060
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-54-49-000-001).
(2) Make sure that the FPPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(3) Make sure that the APPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(4) Make sure that the APPU/FPPU angles (deg) agree (+/- 1.3 deg).
(5) Make sure that the LH APPU and the RH APPU angles agree (+/- 0.45
deg).
(6) If the APPU and FPPU angles are not within the specified limit, do
these steps:
(a) Disconnect the APPU and adjust the APPU input shaft.
(b) Do again step (6)(a) until the APPU angles are in the specified
limits in relation to the FPPU angles.
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-49


R 
AIJ




Page 432
Aug 01/11

Subtask 27-54-49-860-059
H. Aircraft Maintenance Configuration
(1) Remove the warning notice(s).
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever in the cockpit.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-49-865-059
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-710-050
K. Test
(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
(2) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-49-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) For the LH wing, install
- 193AB, 193BB
- 573AB, 573BB (Ref. TASK 57-51-37-400-002).



EFF :
ALL
 27-54-49



AIJ




Page 433
Aug 01/11

(b) For the RH wing, install


- 194AB, 194BB
- 673AB, 673BB (Ref. TASK 57-51-37-400-002).
(3) Close the applicable MLG door (Ref. TASK 32-12-00-410-001).
Subtask 27-54-49-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-49


R 
AIJ




Page 434
Aug 01/11

TASK 27-54-49-000-002
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27504030001

circuit breaker(s) safety clip(s)


clamp
safety barriers
warning notice(s)
access platform 2.8 m (9 ft. 2 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)



EFF :
ALL
 27-54-49


R 
AIJ




Page 435
May 01/10

INTENTIONALLY BLANK



R

 27-54-49



AIJ




Page 436
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-50-00-866-008
27-54-45-000-005
27-60-00-866-002
31-32-00-860-006
27-54-49-400-002
27-54-49-991-005
27-54-49-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Torque Shaft 6210CM(6260CM)
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Flap Track 2 Actuator
6211CM(6261CM) (for corrective action)
Fig. 403
Fig. 404

3. __________
Job Set-up
(Ref. Fig. 403/TASK 27-54-49-991-005, 404/TASK 27-54-49-991-002)
Subtask 27-54-49-941-061
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the flight controls.
Subtask 27-54-49-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.



EFF :
ALL
 27-54-49


R 
AIJ




Page 437
Feb 01/09

Flap Track 2 Actuator


Figure 404/TASK 27-54-49-991-002


EFF :
ALL
 27-54-49


R 
AIJ




Page 438
Feb 01/09

(3) Extend the No. 1 spoiler (Ref. TASK 27-60-00-866-002).


(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-54-49-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-010-055
D. Get Access
(1) Put the access platform in position below the applicable access
panel.
(2) Remove the applicable access panels:
(a) FOR 6211CM
remove 193AB, 193BB 573AB, 573BB, 573CB, 575CB
(b) FOR 6261CM
remove 194AB, 194BB 673AB, 673BB, 673CB, 675CB.
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-49-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-480-051
A. Installation of Support Equipment
(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on
the torque shafts (1) and (6) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-54-49


R 
AIJ




Page 439
Aug 01/11

Subtask 27-54-49-740-060
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.
NOTE : The APPU and the FPPU synchro
____
angles must agree within 1.3
deg.
The LH APPU and the RH APPU
synchro angles must agree within
0.45 deg.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print-out
of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you



EFF :
ALL
 27-54-49



AIJ




Page 440
Aug 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-5449-400-002).
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-020-058
C. Preparation for Removal of the Flap Track 2 Actuator
(1) Hold the trailing edge of the flap on supports.
(2) Use the clamp to hold the carriage in position.
NOTE : This will make sure that the carriage does not move.
____



EFF :
ALL
 27-54-49



AIJ




Page 441
May 01/10

(3) Remove the torque shaft (4) and the universal joint (3) (Ref. TASK
27-54-45-000-005).
Subtask 27-54-49-020-059
D. Removal of the Flap Track 2 Actuator
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.
(1) Remove the nut (8) the washer (7), the bolt (14) and the countersunk
washer (15).
(2) Remove the nuts (13), the washers (12), the bolts (9) and the
countersunk washers (10).
(3) Do these
- remove
- remove
- remove

steps together:
the actuator assembly from the structure interface
the torque limiter from the drive of the torque shaft (2)
the actuator assembly from the flap drive lever.

(4) Prevent damage to the component interface and the adjacent area.



EFF :
ALL
 27-54-49


R 
AIJ




Page 442
Feb 01/09

TASK 27-54-49-400-002
Installation of the Flap Track 2 Actuator 6211CM(6261CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
FOR FIN 6261CM
No specific

safety barriers
warning notice
access platform 2.8 m (9 ft. 2 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-49


R 
AIJ




Page 443
Feb 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 19-003
FOR FIN 6261CM
Material No. 09-018
Material No. 09-019
Material No. 15-007

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-41-00-861-002
24-41-00-862-002
27-50-00-000-003
R

27-50-00-866-008
27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
27-54-45-000-005
27-60-00-866-002
31-32-00-860-006
27-54-49-000-002
27-54-49-991-002

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Removal of the Torque Shaft 6210CM(6260CM)
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
(for corrective action)
Fig. 404



EFF :
ALL
 27-54-49



AIJ




Page 444
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 6261CM
20-28-00-869-002
20-28-00-912-004
27-54-45-400-005

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Installation of the Torque Shaft 6210CM(6260CM)

3. __________
Job Set-up
(Ref. Fig. 404/TASK 27-54-49-991-002)
Subtask 27-54-49-941-069
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-54-49-860-056
B. Aircraft Maintenance Configuration
(Ref. Fig. 404/TASK 27-54-49-991-002)
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever in the cockpit.
(3) Make sure that the No. 1 spoiler has been extended (Ref. TASK 27-6000-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(5) Make sure that the trailing edge of the flap is on a support.
(6) Make sure that the clamp holds the carriage in position.
(7) Make sure that the access platform is in position below the
applicable access panel.



EFF :
ALL
 27-54-49


R 
AIJ




Page 445
Nov 01/09

(8) Make sure that the applicable access panels are removed:
- for the left wing, panels 193AB, 193BB, 573AB, 573BB, 573CB, 575CB
- for the right wing, panels 194AB, 194BB, 673AB, 673BB, 673CB,
675CB.
(9) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) are installed
on the torque shafts (1) and (6).
(10) Make sure that the torque shaft (4) and the universal joint (3) have
been removed (Ref. TASK 27-54-45-000-005).
Subtask 27-54-49-865-060
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-49-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-420-057
R

A. Preparation for Installation


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the component interfaces and the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-54-49



AIJ




Page 446
Nov 01/09

(2) Clean
moist
- the
- the
- the
- the
- the

these items with a MISCELLANEOUS (Material No. 19-003) made


with CLEANING AGENTS (Material No. 11-026):
internal splines of the flap drive lever
drive splines of the flap actuator
internal splines of the torque limiter
splines of the torque shaft (2)
splines of the universal joint (3).

(3) Do a visual inspection for the correct condition of:


- the internal splines of the flap drive lever
- the drive splines of the flap actuator
- the internal splines of the torque limiter
- the splines of the torque shaft (2)
- the splines of the universal joint (3).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(6) Apply
- the
- the
- the

a thin layer of COMMON GREASE (Material No. 04-018) to:


drive splines of the actuator
internal splines of the flap drive lever
internal splines of the torque limiter.

Subtask 27-54-49-420-068
R

B. Installation of the Flap Track 2 Actuator 6211CM(6261CM)


CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.

R
R
R

CAUTION : DO A CHECK OF THE FLAP DRIVE SYSTEM AFTER YOU INSTALL A FLAP
_______
ROTARY ACTUATOR. INCORRECT ALIGNMENT CAN CAUSE A FLAP TO BECOME
LOCKED.
(1) Do these steps together:
- turn the actuator drive, as necessary, and engage the actuator
drive into the flap drive lever
- install the torque limiter on the torque shaft (2).



EFF :
ALL
 27-54-49



AIJ




Page 447
Nov 01/10

(2) Do these steps if the bolt holes of the actuator assembly and the
structure do not align:
(a) Move the torque limiter away from the torque shaft (2).
(b) Put the universal joint (3) into the torque limiter.
(c) Turn the universal joint (3) until the bolt holes are aligned.
(d) Install the torque limiter on the torque shaft (2).
(e) Remove the universal joint (3).
(3) Put a countersunk washer (10) on a bolt (9), with the countersink
adjacent to the head of the bolt.
(4) Install the bolt (9), with the countersunk washer (10), washer (12)
and the nut (13) in the applicable hole (Ref. TASK 20-28-00-912-004):
(a) FOR 6211CM
in the LH wing bonding position
(b) FOR 6261CM
in the RH wing bonding position.
NOTE : Do not tighten in this step. Do not apply sealant.
____
(5) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to these remaining items:
- the shanks of the bolts (9) and (14).
(6) Put the countersunk washers (10) and (15) on the bolts (9) and (14).
Make sure that countersink is adjacent to the heads of the bolts.
(7) Install the longer bolt (14) through the lever stop (11), the
structure and the actuator assembly.
(8) Install the washer (7) and the nut (8) on the longer bolt (14). Do
not tighten in this step.
(9) Install the remaining bolts (9) through the actuator assembly and the
structure.
(10) Install a washer (12) and a nut (13) on each of the bolts (9).
(11) TORQUE all the nuts (8) and (13) in a diagonally opposite sequence to
between 2.8 and 3.0 m.daN (20.64 and 22.12 lbf.ft).



EFF :
ALL
 27-54-49


R 
AIJ




Page 448
Nov 01/10

(12) Do an electrical bonding check between the structure and the


applicable bolt (Ref. TASK 20-28-00-869-002):
(a) FOR 6211CM
in the LH wing bonding position
(b) FOR 6261CM
in the RH wing bonding position.
(13) Seal the bolt (9), the countersunk washer (10), the washer (12) and
the nut (13) installed in the applicable hole (Ref. TASK 20-28-00912-004):
(a) FOR 6211CM
in the LH wing bonding position
(b) FOR 6261CM
in the RH wing bonding position.
(14) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to these
remaining items:
- the bolts (9) and (14
- the washers (7), (10), (12) and (15)
- the nuts (8) and (13).
(15) Install the universal joint (3) and the torque shaft (4) (Ref. TASK
27-54-45-400-005):
(a) FOR 6211CM
install 6210CM
(b) FOR 6261CM
install 6260CM.
Subtask 27-54-49-080-053
C. Removal of Support Equipment
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shafts
(1) and (6) (Ref. TASK 27-50-00-000-003).
(2) Remove the clamp that holds the carriage in position.
(3) Remove the support from the flap trailing edge.



EFF :
ALL
 27-54-49


R 
AIJ




Page 449
Nov 01/10

Subtask 27-54-49-740-075
D. Check of the Flap Drive System
(1) Do a check of the Flap Drive System (Ref. TASK 27-54-00-220-007).
(2) If necessary, do the adjustment of the interconnecting strut
(Ref. TASK 27-51-44-820-001).
Subtask 27-54-49-740-062
E. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s).


Refer to Table 1.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print out
of the screen.



EFF :
ALL
 27-54-49



AIJ




Page 450
Aug 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the electrical
circuits (Ref. TASK 24-41-00-862002).
Subtask 27-54-49-820-063
F. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-54-49-000-002).
(2) Make sure that the FPPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(3) Make sure that the APPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(4) Make sure that the APPU/FPPU angles (deg) agree (+/- 1.3 deg).
(5) Make sure that the LH APPU and the RH APPU angles agree (+/- 0.45
deg).
(6) If the APPU and FPPU angles are not within the specified limit, do
these steps:
(a) Disconnect the APPU and adjust the APPU input shaft.
(b) Do again step (6)(a) until the APPU angles are in the specified
limits in relation to the FPPU angles.
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|



EFF :
ALL
 27-54-49


R 
AIJ




Page 451
Nov 01/10

------------------------------------------------------------------------------|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-860-055
G. Aircraft Maintenance Configuration
(1) Retract the No. 1 spoiler (Ref. TASK 27-60-00-866-002).
(2) Make sure that the applicable spoiler servo-control is in the O
(Operation) condition.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-49-865-061
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-49-710-051
J. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).



EFF :
ALL
 27-54-49


R 
AIJ




Page 452
Nov 01/10

5. Close-up
________
Subtask 27-54-49-410-054
A. Close Access
(1) Install the applicable access panels:
- for the left wing, install 193AB, 193BB and 573AB, 573BB, 573CB,
575CB
- for the right wing, install 194AB, 194BB and 673AB, 673BB, 673CB,
675CB.
Subtask 27-54-49-942-053
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-49


R 
AIJ




Page 453
Nov 01/10

TASK 27-54-49-000-003
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27604000000

circuit breaker(s) safety clip(s)


clamp
safety barriers
warning notice(s)
access platform 2.8 m (9 ft. 2 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
2 COLLAR-SAFETY, SPOILER



R
EFF :
ALL
 27-54-49



AIJ




Page 454
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-50-00-866-008
27-60-00-866-002
31-32-00-860-006
27-54-49-400-003
27-54-49-991-005
27-54-49-991-003
FOR FIN 6221CM
27-54-45-000-007
27-54-45-000-010
FOR FIN 6271CM
27-54-45-000-007
27-54-45-000-010

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Flap Track 3 Actuator
6221CM(6271CM) (for corrective action)
Fig. 403
Fig. 405
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Removal of the Torque Shaft 6222CM(6272CM)
Removal of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Removal of the Torque Shaft 6222CM(6272CM)

3. __________
Job Set-up
(Ref. Fig. 403/TASK 27-54-49-991-005, 405/TASK 27-54-49-991-003)
Subtask 27-54-49-941-063
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the flight controls.



EFF :
ALL
 27-54-49


R 
AIJ




Page 455
Feb 01/09

Flap Track 3 Actuator


Figure 405/TASK 27-54-49-991-003


EFF :
ALL
 27-54-49


R 
AIJ




Page 456
Feb 01/09

Subtask 27-54-49-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
(3) Extend the No. 2 and the No. 3 spoilers (Ref. TASK 27-60-00-866-002).
(4) Put a COLLAR-SAFETY, SPOILER (98D27604000000) on the piston rod of
each servo-control.
Subtask 27-54-49-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-010-056
D. Get Access
(1) Put the access platform in position below the applicable access
panel.
(2) Remove the applicable access panels:
(a) FOR 6221CM
remove 573BB, 575AB, 575BB, 575CB, 575DB
(b) FOR 6271CM
remove 673BB, 675AB, 675BB, 675CB, 675DB.



EFF :
ALL
 27-54-49


R 
AIJ




Page 457
Aug 01/11

4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-49-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-49-480-052
A. Installation of Support Equipment
(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on
the torque shafts (1) and (5) (Ref. TASK 27-50-00-400-003).
Subtask 27-54-49-740-064
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):



EFF :
ALL
 27-54-49



AIJ




Page 458
Aug 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------Refer to Table 1.
NOTE : The APPU and the FPPU synhro
____
angle must agree within 1.3 deg.
The LH APPU and the RH APPU
synchro angles must agree within
0.45 deg.
- write down the APPU and the
FPPU angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print-out
of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-5449-400-003).
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|



EFF :
ALL
 27-54-49



AIJ




Page 459
May 01/10

R
R
R

------------------------------------------------------------------------------| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-54-49-020-060
C. Preparation for Removal of the Flap Track 3 Actuator
(1) Hold the trailing edge of the flap on supports.
(2) Use the clamp to hold the carriage in position.
NOTE : This will make sure that the carriage does not move.
____
(3) Remove the applicable torque shafts (2) and (4) and the universal
joint (3):
(a) FOR 6221CM
remove FIN 6222CM (Ref. TASK 27-54-45-000-010) and FIN 6220CM
(Ref. TASK 27-54-45-000-007)
(b) FOR 6271CM
remove FIN 6272CM (Ref. TASK 27-54-45-000-010) and FIN 6270CM
(Ref. TASK 27-54-45-000-007).
Subtask 27-54-49-020-055
D. Removal of the Flap Track 3 Actuator 6221CM (6271CM)
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.
(1) Remove the nuts (8), the washers (9), the bolts (7) and the
countersunk washers (6).
(2) Remove the actuator assembly from the structure interface and the
flap drive lever.
(3) Prevent damage to the component interface and the adjacent area.



EFF :
ALL
 27-54-49



AIJ




Page 460
May 01/10

TASK 27-54-49-400-003
Installation of the Flap Track 3 Actuator 6221CM(6271CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
FOR FIN 6271CM
No specific

safety barriers
warning notice
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)



EFF :
ALL
 27-54-49


R 
AIJ




Page 461
May 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003
FOR FIN 6271CM
Material No. 09-018
Material No. 09-019

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-41-00-861-002
24-41-00-862-002
27-50-00-000-003

27-50-00-866-008
27-50-00-866-009
27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
27-60-00-866-002
31-32-00-860-006
27-54-49-000-003
27-54-49-991-003

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
(for corrective action)
Fig. 405



R
EFF :
ALL
 27-54-49



AIJ




Page 462
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 6221CM
27-54-45-400-007
27-54-45-400-010
FOR FIN 6271CM
20-28-00-869-002
27-54-45-400-007
27-54-45-400-010

Installation of the Torque Shafts


6214CM(6264CM)/6220CM(6270CM)
Installation of the Torque Shaft 6222CM(6272CM)
Table of the Maximum Permitted Resistance Values
Installation of the Torque Shafts
6214CM(6264CM)/6220CM(6270CM)
Installation of the Torque Shaft 6222CM(6272CM)

3. __________
Job Set-up
(Ref. Fig. 405/TASK 27-54-49-991-003)
Subtask 27-54-49-941-071
A. Safety Precautions
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-54-49-860-057
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
(3) Make sure that the No. 2 and the No. 3 spoilers have been extended
(Ref. TASK 27-60-00-866-002).
(4) Make sure that there is a COLLAR-SAFETY, SPOILER on the piston rod of
each servo-control.



EFF :
ALL
 27-54-49


R 
AIJ




Page 463
Nov 01/10

INTENTIONALLY BLANK



R

 27-54-49



AIJ




Page 464
Nov 01/10

(5) Make sure that the trailing edge of the flap is on supports.
(6) Make sure that the clamp holds the carriage in position.
(7) Make sure that the access platform is below the applicable access
panel.
(8) Make sure that the applicable access panels are removed:
- for the left wing, panels 573BB, 575AB, 575BB, 575CB, 575DB
- for the right wing, panels 673BB, 675AB, 675BB, 675CB, 675DB.
(9) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) are installed
on the applicable torque shafts.
(10) Make sure that the applicable torque shafts and the universal joint
are removed.
Subtask 27-54-49-865-062
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 405/TASK 27-54-49-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-49


R 
AIJ




Page 465
Nov 01/09

Subtask 27-54-49-560-051
A. Preparation for a Replacement Component
(1) Replacement actuator assemblies of flap track 3 are supplied in the
Left Hand (LH) configuration. To change a replacement actuator of
track 3 to a Right Hand (RH) configuration:
CAUTION : DO NOT DISENGAGE THESE ITEMS FROM THE OFFSET GEARBOX WHEN
_______
YOU CHANGE THE CONFIGURATION FROM LH TO RH :
- THE TORQUE LIMITER
- THE ROTARY ACTUATOR.
THESE ITEMS ARE NOT LRUS AND ARE NOT INTERCHANGEABLE.
(a) Remove the nuts (11), the bolts (14) and the washers (10).
(b) Keep the mating surface of the torque limiter assembly (12) in
contact with the offset gearbox (15). Turn the torque limiter
assembly (12) until the arrow is aligned with the R mark on the
offset gearbox (15).
(c) Install the bolts (14), the washers (10) and the nuts (11).
(d) TORQUE all the nuts (11) to between 0.78 and 0.96 m.daN (69.02
and 84.95 lbf.in).
(e) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to
the bolts (14), the washers (10) and the nuts (11).
(2) Make sure the flap track 3 actuator and the torque limiter are
aligned.
Subtask 27-54-49-420-058
R

B. Preparation for Installation


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the component interfaces and the adjacent areas with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-54-49



AIJ




Page 466
Nov 01/09

(2) Clean
moist
- the
- the
- the
- the

these items with a MISCELLANEOUS (Material No. 19-003) made


with CLEANING AGENTS (Material No. 11-026):
internal splines of the flap drive lever
drive splines of the flap actuator
internal splines of the torque limiter
splined part of the universal joint (3).

(3) Do a visual inspection for the correct condition of:


- the internal splines of the flap drive lever
- the drive splines of the flap actuator
- the internal splines of the torque limiter
- the splines of the universal joint (3).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(6) Apply
- the
- the
- the
- the

a thin layer of COMMON GREASE (Material No. 04-018) to:


drive splines of the flap actuator
internal splines of the flap drive lever
internal splines of the torque limiter
splined part of the universal joint (3).

Subtask 27-54-49-420-067
R

C. Installation of the Flap Track 3 Actuator 6221CM(6271CM)


CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.

R
R
R

CAUTION : DO A CHECK OF THE FLAP DRIVE SYSTEM AFTER YOU INSTALL A FLAP
_______
ROTARY ACTUATOR. INCORRECT ALIGNMENT CAN CAUSE A FLAP TO BECOME
LOCKED.
(1) Turn the actuator drive, as necessary, and engage the actuator drive
in the flap drive lever.
(2) Do these steps if the bolt holes of the actuator assembly and the
structure do not align:
(a) Put the universal joint (3) in the torque limiter.



EFF :
ALL
 27-54-49



AIJ




Page 467
Nov 01/10

(b) Turn the universal joint (3) until the bolt holes align.
(c) Remove the universal joint (3).
(3) Put a countersunk washer (6) on a bolt (7), with the countersink
adjacent to the head of the bolt.
(4) Install the bolt (7), with a countersunk washer (6), washer (9) and
one of the nuts (8) in the applicable hole (Ref. TASK 20-28-00-912004):
(a) FOR 6221CM
in the LH wing bonding position
(b) FOR 6271CM
in the RH wing bonding position.
NOTE : Do not tighten in this step. Do not apply sealant.
____
(5) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (7).
(6) Put the countersunk washers (6) on the bolts (7), with the
countersink adjacent to the heads of the bolts.
(7) Install the bolts (7) through the actuator assembly and the
structure.
(8) Install the washers (9) and a nut (8) on each of the bolts (7).
(9) TORQUE all the nuts (8) in a diagonally opposite sequence to between
2.8 and 3.0 m.daN (20.64 and 22.12 lbf.ft).
(10) Do an electrical bonding check between the structure and the
applicable bolt (Ref. TASK 20-28-00-869-002):
(a) FOR 6221CM
in the LH wing bonding position
(b) FOR 6271CM
in the RH wing bonding position.



EFF :
ALL
 27-54-49


R 
AIJ




Page 468
Nov 01/10

(11) Seal the bolt (7), the countersunk washer (6), the washer (9) and the
nut (8) in the applicable bonding position (Ref. TASK 20-28-00-912004):
(a) FOR 6221CM
in the LH wing bonding position
(b) FOR 6271CM
in the RH wing bonding position.
(12) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to these
remaining items:
- the bolts (7) and the nuts (8)
- the washers (6) and (9).
(13) Install the universal joint (3) and the torque shafts (2) and (4):
(a) FOR 6221CM
install 6222CM (Ref. TASK 27-54-45-400-010) and 6220CM (Ref. TASK
27-54-45-400-007)
(b) FOR 6271CM
install 6772CM (Ref. TASK 27-54-45-400-010) and 6270CM (Ref. TASK
27-54-45-400-007).
Subtask 27-54-49-080-051
D. Removal of Support Equipment
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
(2) Remove the clamp that holds the carriage in position.
(3) Remove the support from the flap trailing edge.
Subtask 27-54-49-740-076
E. Check of the Flap Drive System
(1) Do a check of the Flap Drive System (Ref. TASK 27-54-00-220-007).
R
R

(2) If necessary, do the adjustment of the interconnecting strut


(Ref. TASK 27-51-44-820-001).
Subtask 27-54-49-740-065
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).



EFF :
ALL
 27-54-49



AIJ




Page 469
Nov 01/10

(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s).


Refer to Table 1.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print out
of the screen.
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the electrical
circuits (Ref. TASK 24-41-00-862002).
Subtask 27-54-49-820-064
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-54-49-000-003).
(2) Make sure that the FPPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).



EFF :
ALL
 27-54-49



AIJ




Page 470
Aug 01/11

(3) Make sure that the APPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(4) Make sure that the APPU/FPPU angles (deg) agree (+/- 1.3 deg).
(5) Make sure that the LH APPU and the RH APPU angles agree (+/- 0.45
deg).
(6) If the APPU and FPPU angles are not within the specified limit, do
these steps:
(a) Disconnect the APPU and adjust the APPU input shaft.
(b) Do again step (6)(a) until the APPU angles are in the specified
limits in relation to the FPPU angles.
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-860-060
H. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Retract the No. 2 and the No. 3 spoilers (Ref. TASK 27-60-00-866002).



EFF :
ALL
 27-54-49



AIJ




Page 471
May 01/10

(3) Remove the warning notice(s).


(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever in the cockpit.
(5) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-54-49-865-063
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-49-710-052
K. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-49-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
- for the left wing, install 573BB, 575AB, 575BB, 575CB, 575DB
- for the right wing, install 673BB, 675AB, 675BB, 675CB, 675DB.
Subtask 27-54-49-942-055
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-49


R 
AIJ




Page 472
May 01/10

TASK 27-54-49-000-004
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27604000000

circuit breaker(s) safety clip(s)


clamp
safety barriers
warning notice(s)
access platform 2.8 m (9 ft. 2 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
2 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-54-49


R 
AIJ




Page 473
Feb 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-50-00-866-008
27-51-18-000-001
27-54-45-000-013
27-60-00-866-002
31-32-00-860-006
27-54-49-400-004
27-54-49-991-005
27-54-49-991-004

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Asymmetry-Position Pick-Off Unit 29CV
(30CV)
Removal of the Torque Shaft 6232CM(6282CM)
Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Installation of the Flap Track 4 Actuator
6233CM(6283CM) (for corrective action)
Fig. 403
Fig. 406

3. __________
Job Set-up
(Ref. Fig. 403/TASK 27-54-49-991-005, 406/TASK 27-54-49-991-004)
Subtask 27-54-49-941-065
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the flight controls.
Subtask 27-54-49-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).



EFF :
ALL
 27-54-49


R 
AIJ




Page 474
Feb 01/09

Flap Track 4 Actuator


Figure 406/TASK 27-54-49-991-004


EFF :
ALL
 27-54-49


R 
AIJ




Page 475
Feb 01/09

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
(3) Extend the No. 4 and the No. 5 spoilers (Ref. TASK 27-60-00-866-002).
(4) Put a COLLAR-SAFETY, SPOILER (98D27604000000) on the piston rod of
each servo-control.
Subtask 27-54-49-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-49-010-057
D. Get Access
(1) Put the access platform in position below the applicable access
panel.
(2) Remove the applicable access panels:
- FOR 6233CM
remove 573BB, 575CB, 575EB, 575FB, 575GB
- FOR 6283CM
remove 673BB, 675CB, 675EB, 675FB, 675GB.
4. Procedure
_________
(Ref. Fig. 406/TASK 27-54-49-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-49


R 
AIJ




Page 476
Feb 01/09

Subtask 27-54-49-480-053
A. Installation of Support Equipment
(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on
the torque shaft (3) (Ref. TASK 27-50-00-400-003).
Subtask 27-54-49-740-066
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.
NOTE : The APPU and the FPPU synhro
____
angle must agree within 1.3 deg.
The LH APPU and the RH APPU
synchro angles must agree within
0.45 deg.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line



EFF :
ALL
 27-54-49



AIJ




Page 477
Aug 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------key PRINT > to get a print-out
of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-5449-400-004).
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the aircraft
electrical circuits (Ref. TASK 2441-00-862-002).
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-49


R 
AIJ




Page 478
Aug 01/11

Subtask 27-54-49-020-061
C. Preparation for Removal
(1) Remove the Asymmetry Position Pick-off Unit (APPU) (4) (Ref. TASK 2751-18-000-001).
(2) Hold the trailing edge of the flap on supports.
(3) Use the clamp to hold the carriage in position.
NOTE : This will make sure that the carriage does not move.
____
(4) Remove the torque shaft (2) and the universal joint (1) (Ref. TASK
27-54-45-000-013):
- FOR 6233CM
remove FIN 6232CM
- FOR 6283CM
remove FIN 6282CM.
Subtask 27-54-49-020-056
D. Removal of the Flap Track 4 Actuator 6233CM(6283CM)
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.
(1) Remove the nuts (12), the washers (11), the bolts (9) and the
countersunk washers (10).
(2) Carefully remove the actuator assembly from the structure interface
and the flap drive lever.



EFF :
ALL
 27-54-49


R 
AIJ




Page 479
Feb 01/09

TASK 27-54-49-400-004
Installation of the Flap Track 4 Actuator 6233CM(6283CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific

safety barriers
warning notice
Torque Wrench : range 0.00 to 1.20
(0.00 to
Torque Wrench : range 0.20 to 3.60
(2.00 to

m.daN
9.00 lbf.ft)
m.daN
26.00 lbf.ft)



EFF :
ALL
 27-54-49


R 
AIJ




Page 480
Feb 01/09

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-115
Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-P-8116B
JOINTING COMPOUND (CONDUCTIVE) (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-004
24-41-00-861-002
24-41-00-862-002
27-50-00-000-003
27-50-00-866-008
27-51-18-000-001
27-51-18-400-001
R

27-51-44-820-001
27-54-00-220-007
27-54-00-710-001
27-54-45-000-013

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Removal of the Asymmetry-Position Pick-Off Unit 29CV
(30CV)
Installation of the Asymmetry-Position Pick-Off Unit
29CV (30CV)
Adjustment of the Interconnecting Strut
Check of the Flap Drive System
Operational Test of the Flap System
Removal of the Torque Shaft 6232CM(6282CM)



EFF :
ALL
 27-54-49



AIJ




Page 481
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-45-400-013
27-60-00-866-002
31-32-00-860-006
27-54-49-000-004
27-54-49-991-004

Installation of the Torque Shaft 6232CM(6282CM)


Extension-Retraction of the Spoilers for Maintenance
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
(for corrective action)
Fig. 406

3. __________
Job Set-up
(Ref. Fig. 406/TASK 27-54-49-991-004)
Subtask 27-54-49-941-073
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-54-49-860-058
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever in the cockpit.
(3) Make sure that the No. 4 and the No. 5 spoilers have been extended
(Ref. TASK 27-60-00-866-002).
(4) Make sure that a COLLAR-SAFETY, SPOILER is on the piston rod of each
servo-control.
(5) Make sure that the trailing edge of the flap is on a support.
(6) Make sure that the clamp holds the carriage in position.



EFF :
ALL
 27-54-49


R 
AIJ




Page 482
Nov 01/09

(7) Make sure that the access platform is below the applicable access
panel.
(8) Make sure that the applicable access panels are removed:
- for the left wing, panels 573BB, 575CB, 575EB, 575FB, 575GB
- for the right wing, panels 673BB, 675CB, 675EB, 675FB, 675GB.
(9) Make sure that the Asymmetry Position Pick-off Unit (APPU) (4) has
been removed (Ref. TASK 27-51-18-000-001).
(10) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the applicable torque shafts.
(11) Make sure that the torque shaft (2) and the universal joint (1) have
been removed (Ref. TASK 27-54-45-000-013).
Subtask 27-54-49-865-064
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 406/TASK 27-54-49-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-49


R 
AIJ




Page 483
Feb 01/09

Subtask 27-54-49-560-050
A. Preparation for a Replacement Component
(1) Replacement actuators of flap track 4 are supplied in the Left Hand
(LH) configuration. To change a replacement actuator of track 4 to a
Right Hand (RH) configuration:
CAUTION : DO NOT DISENGAGE THESE ITEMS FROM THE OFFSET GEARBOX WHEN
_______
YOU CHANGE THE CONFIGURATION FROM LH TO RH :
- THE TORQUE LIMITER
- THE ROTARY ACTUATOR.
THESE ITEMS ARE NOT LRUS AND ARE NOT INTERCHANGEABLE.
(a) Remove the nuts (8), the bolts (6) and the washers (7).
(b) Keep the mating surface of the torque limiter assembly (5) in
contact with the offset gearbox (16). Turn the torque limiter
assembly (5) until:
- the arrow on the torque limiter assembly (5) aligns with the
R on the offset gearbox (16).
(c) Install the bolts (6), the washers (7) and the nuts (8).
(d) TORQUE the nuts (8) to between 0.78 and 0.96 m.daN (69.02 and
84.95 lbf.in).
(e) Remove the bolts (14) and the washers (15).
(f) Turn the actuator housing (13) until:
- the R on the actuator housing aligns with the arrow on the
offset gearbox (16).
(g) Application of special material:
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER
_______
SPECIAL MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN
IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.



EFF :
ALL
 27-54-49


R 
AIJ




Page 484
Feb 01/09

Apply a layer of SPECIAL MATERIALS (Material No. 05-115) to the


shanks of the bolts (14).
(h) Install the bolts (14) and the washers (15). TORQUE the bolts
(14) to between 0.78 and 0.96 m.daN (69.02 and 84.95 lbf.in).
(i) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolts (6), washers (7) and nuts (8)
- the heads of the bolts (14) and the washers (15).
(2) Make sure that the actuator housing (13), the offset gearbox (16) and
the torque limiter assembly (5) are aligned.
Subtask 27-54-49-420-062
R

B. preparation for Installation


CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the component interfaces and the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Clean
moist
- the
- the
- the
- the

these items with a MISCELLANEOUS (Material No. 19-003) made


with CLEANING AGENTS (Material No. 11-026):
internal splines of the flap drive lever
drive splines of the flap actuator
internal splines of the torque limiter
splines of the universal joint (1).

(3) Do a visual check for the correct condition of:


- the internal splines of the flap drive lever
- the drive splines of the flap actuator
- the internal splines of the torque limiter
- the splines of the universal joint (1).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
R
R

CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.


_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.



EFF :
ALL
 27-54-49



AIJ




Page 485
Nov 01/09

(6) Apply
- the
- the
- the

a thin layer of COMMON GREASE (Material No. 04-018) to:


drive splines of the actuator
internal splines of the flap drive lever
internal splines of the torque limiter.

Subtask 27-54-49-420-066
R

C. installation of the Flap Track 4 Actuator 6233CM(6283CM)


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : SUPPORT THE ACTUATOR, WHICH CAN WEIGH UP TO 10.5kg (23.2lbs).
_______
THIS WILL PREVENT DAMAGE TO THE RELATED STRUCTURE AND
EQUIPMENT.

R
R
R

CAUTION : DO A CHECK OF THE FLAP DRIVE SYSTEM AFTER YOU INSTALL A FLAP
_______
ROTARY ACTUATOR. INCORRECT ALIGNMENT CAN CAUSE A FLAP TO BECOME
LOCKED.
(1) Turn the actuator drive, as necessary, and engage the actuator drive
in the flap drive lever.
(2) Do these steps if the bolt holes of the actuator assembly and the
structure do not align:
(a) Put the universal joint (1) in the torque limiter.
(b) Turn the universal joint (1) until the bolt holes align.
(c) Remove the universal joint (1).
(3) Put a countersunk washer (10) on a bolt (9), with the countersink
adjacent to the head of the bolt.
(4) Install this bolt (9) with the countersunk washer (10), washers (11)
and a nut (12) in the applicable hole (Ref. TASK 20-28-00-912-004):
(a) FOR 6233CM
in the LH wing bonding position



EFF :
ALL
 27-54-49



AIJ




Page 486
Nov 01/10

(b) FOR 6283CM


in the RH wing bonding position.
Do not tighten in this step. Do not apply sealant.
(5) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (9).
(6) Put the countersunk washers (10) on the bolts (9), with the
countersink adjacent to the heads of the bolts.
(7) Install the remaining bolts (9), the washers (11) and the nuts (12).
(8) TORQUE all the nuts (12) in a diagonally opposite sequence to between
2.8 and 3.0 m.daN (20.64 and 22.12 lbf.ft).
(9) Do an electrical bonding check between the structure and the
applicable bolt (Ref. TASK 20-28-00-869-002):
(a) FOR 6233CM
in the LH wing bonding position
(b) FOR 6283CM
in the RH wing bonding position.
(10) Seal the bolt (9), the countersunk washer (10), the washers (11) and
the nut (12) in the applicable hole (Ref. TASK 20-28-00-912-004):
(a) FOR 6233CM
in the LH wing bonding position
(b) FOR 6283CM
in the RH wing bonding position.
(11) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to these
remaining items:
- the bolts (9
- the countersunk washers (10)
- the washers (11)
- the nuts (12).
(12) Install the universal joint (1) so that the flanges align with the
torque shaft (2).
(13) Install the torque shaft (2) (Ref. TASK 27-54-45-400-013):
(a) FOR 6233CM
install 6232CM



EFF :
ALL
 27-54-49


R 
AIJ




Page 487
Nov 01/10

(b) FOR 6283CM


install 6282CM.
(14) Install the Asymmetry Position Pick-off Unit (APPU) (4) (Ref. TASK
27-51-18-400-001).
Subtask 27-54-49-080-055
D. Removal of Support Equipment
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003).
(2) Remove the clamp that holds the carriage in position.
(3) Remove the support from the flap trailing edge.
Subtask 27-54-49-740-077
E. Check of the Flap Drive System
(1) Do a check of the Flap Drive System (Ref. TASK 27-54-00-220-007).
R
R

(2) If necessary, do the adjustment of the interconnecting strut


(Ref. TASK 27-51-44-820-001).
Subtask 27-54-49-740-067
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).



EFF :
ALL
 27-54-49



AIJ




Page 488
Nov 01/10

(3) Do a check of the flap PPU angles (deg) at the slat/flap control
lever position FULL on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s).


Refer to Table 1.

- write down the APPU and the FPPU


angles (deg) shown on the
display or push (in) the line
key PRINT > to get a print out
of the screen.
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
2. De-energize the electrical
circuits (Ref. TASK 24-41-00-862002).
Subtask 27-54-49-820-065
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-54-49-000-004).
(2) Make sure that the FPPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).
(3) Make sure that the APPU angle values agree with the values recorded
before the actuators were removed (+/- 0.2 deg).



EFF :
ALL
 27-54-49



AIJ




Page 489
Aug 01/11

(4) Make sure that the APPU/FPPU angles (deg) agree (+/- 1.3 deg).
(5) Make sure that the LH APPU and the RH APPU angles agree (+/- 0.45
deg).
(6) If the APPU and FPPU angles are not within the specified limit, do
these steps:
(a) Disconnect the APPU and adjust the APPU input shaft.
(b) Do again step (6)(a) until the APPU angles are in the specified
limits in relation to the FPPU angles.
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------Subtask 27-54-49-860-061
H. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Retract the No. 4 and the No. 5 spoilers (Ref. TASK 27-60-00-866002).
(3) Remove the warning notice(s).



EFF :
ALL
 27-54-49


R 
AIJ




Page 490
Nov 01/10

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever in the cockpit.
Subtask 27-54-49-865-065
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-49-710-053
K. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
5. Close-up
________
Subtask 27-54-49-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
- for the left wing, install 573BB, 575CB, 575EB, 575FB, 575GB
- for the right wing, install 673BB, 675CB, 675EB, 675FB, 675GB.
Subtask 27-54-49-942-057
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-49


R 
AIJ




Page 491
Nov 01/10

CONTROL UNIT - POWER (PCU) (FLAPS) (6201CM) - REMOVAL/INSTALLATION


__________________________________________________________________
TASK 27-54-51-000-001
Removal of the Power Control Unit 6201CM of the Flap System
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
R
R

No specific
No specific
No specific
98D27504030001
98D27508625000
98D27803000000

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
2
1
1
2
2
1

ACCESS PLATFORM 3M (10 FT)


CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-51



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-400-003
R

27-50-00-866-009
27-54-00-820-001
29-00-00-864-001
29-14-00-614-001
31-32-00-860-006
32-12-00-010-001
27-54-51-991-003
27-54-51-991-001
27-54-51-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retraction of the Flaps on the Ground
Adjustment of the Flap Drive System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-54-51-860-051
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-51-740-050
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).



EFF :
ALL
 27-54-51



AIJ




Page 402
Nov 01/09

(2) Do a check of the flap PPUs on the MCDU as follows:


R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.

- record the values and use them


as a datum to compare the data
of the PPUs after the
installation of the PCU.
- push the line key < Return
frequently until the CFDS menu
page is shown.
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|
| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
|------------------------------------------------------------------------------



EFF :
ALL
 27-54-51



AIJ




Page 403
Feb 01/11

Subtask 27-54-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-51-010-050
D. Get Access
(1) Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).
R

(2) Put the ACCESS PLATFORM 3M (10 FT) in position at the main gear main
door opening.
Subtask 27-54-51-860-050
E. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Depressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-001).
(3) Put the WARNING NOTICE(S) in position to tell persons not to
pressurize the hydraulic systems.
(4) Put the ACCESS PLATFORM 3M (10 FT) in position at the main gear main
door opening.
(Ref. Fig. 401/TASK 27-54-51-991-003)
(5) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the left and
right flap track positions 1.
(a) If you cannot install the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the L/H (R/H) flap drive system (Ref. TASK 27-5400-820-001).



EFF :
ALL
 27-54-51



AIJ




Page 404
Feb 01/11

R
R

Installation of the Check Pin Track 1-4


Figure 401/TASK 27-54-51-991-003



EFF :
ALL
 27-54-51



AIJ




Page 405
Feb 01/07

(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) at


the left torque shaft (6256CM) to lock the flap transmission outboard
of the left angle gearbox (6253CM) (Ref. TASK 27-50-00-400-003).

(7) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) at


the right torque shaft (6206CM) to lock the flap transmission
outboard of the right angle gearbox (6203CM) (Ref. TASK 27-50-00-400003).
(8) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-51-991-001, 403/TASK 27-54-51-991-002)
Subtask 27-54-51-020-050
A. Removal of the Power Control Unit
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
(1) Disconnect the right torque shaft 6252CM (32) as follows:
(a) Remove the nuts (11) and the bolts (12) which connect the torque
shaft (32) to the input universal joint (35) of the PCU (1).
(b) Disconnect the torque shaft (32) from the input universal joint
(35).
(c) Remove the input universal joint (35) from the PCU (1).
(2) Disconnect the left torque shaft 6202CM (13) as follows:
(a) Remove the nuts (11) and the bolts (12) which connect the torque
shaft (13) to the input universal joint (10) of the PCU (1).
(b) Disconnect the torque shaft (13) from the input universal joint
(10).
(c) Remove the input universal joint (10) from the PCU (1).



EFF :
ALL
 27-54-51



AIJ




Page 406
Nov 01/08

R
R

Power Control Unit of the Flap System


Figure 402/TASK 27-54-51-991-001



EFF :
ALL
 27-54-51



AIJ




Page 407
Feb 01/07

R
R

Power Control Unit of the Flap System - Electrical and Hydraulic Connections
Figure 403/TASK 27-54-51-991-002



EFF :
ALL
 27-54-51



AIJ




Page 408
Feb 01/07

(3) Prepare the PCU (1) for removal as follows:


(a) Disconnect the hydraulic lines (52).
(b) Disconnect the case drain lines (59) and (60).
(c) Remove the tie wraps (46) and disconnect the seal drain lines
(45).
(d) Install the blanking caps or the blanking plugs on the open line
(52) ends and on the PCU (1).
(e) Disconnect the electrical connectors 27CV-A, 27CV-B, 23CV-A,
24CV-A, 3CN-B and 3CN-A.
R

(f) Put blanking caps on the disconnected electrical connector(s).


(g) Disconnect the electrical leads from the clamps which connect
them to the PCU (1).
(h) Remove the cotter pin (8), the nut (9) and the washer (7) from
the bolt (5) which connects the PCU (1) to the attachment rod
assembly (3).
(i) Remove the cotter pin (8), the nut (9) and the washer (7) from
the bolt (5) which connects the PCU (1) to the adjustable rod
assembly (4).
(j) Cut, remove and discard the lockwire from the nut (17).
(k) Remove the nut (17), the washer (18) and the bolt (31).
(l) Remove the nut (19) and the washer (20) from the attachment bolt
(30).
(m) Remove the screw (42), the washer (41) and the bonding jumper
(40).
(4) Remove the PCU (1) as follows:
NOTE : The PCU weighs approximately 20 kg (44.0924 lb).
____
(a) Hold the PCU (1) so that it can not fall.
(b) Remove the bolts (5) and the bushes (6) from the attachment rod
assembly and from the adjustable rod assembly.
(c) Remove the attachment bolt (30).
(d) Remove the PCU (1).



EFF :
ALL
 27-54-51



AIJ




Page 409
May 01/10

TASK 27-54-51-400-001
Installation of the Power Control Unit 6201CM of the Flap System
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
R
R

specific
specific
specific
specific
specific

No specific

tie wraps
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-54-51



AIJ




Page 410
Feb 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27504030001
98D27508625000
98D27803000000

3 LOCK-TORQUE SHAFT (FLAPS AND SLATS)


2 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003

lockwire, corrosion-resistant steel, dia. 0.8 mm


(0.032 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

Material No. 04-018


Material No. 05-005
Material No. 09-013
Material No. 11-002
Material No. 16-021

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------8

cotter pins

27-54-03 04 -050



EFF :
ALL
 27-54-51


R 
AIJ




Page 411
Nov 01/10

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
20-28-00-912-004
27-00-00-080-002
27-00-00-480-002
27-50-00-000-003
27-50-00-400-003
27-50-00-866-009
27-51-00-820-001
27-54-00-710-001
29-00-00-864-001
29-10-00-863-001
29-10-00-863-002
29-14-00-614-001
29-14-00-614-002
31-32-00-860-006
32-12-00-010-001
32-12-00-410-001
27-54-51-991-003
27-54-51-991-001
27-54-51-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retraction of the Flaps on the Ground
Manual Adjustment of the Position Pick-Off Units
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402
Fig. 403



EFF :
ALL
 27-54-51


R 
AIJ




Page 412
Nov 01/10

3. __________
Job Set-up
Subtask 27-54-51-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed on the slat/flap control lever
(Ref. TASK 27-00-00-480-002).
(3) Make sure, that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) are installed at the left torque shaft (6256CM) and
the right torque shaft (6206CM) (Ref. TASK 27-50-00-400-003).
(4) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001)
(5) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.
(7) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
(8) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the main gear main door opening.
(9) Make sure that the CHECK-PIN TRACK 1-4 (98D27508625000) are installed
at the left and right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-51-991-003)
(10) Make sure that a CONTAINER 5 L(1 1/2 USGAL) is in position below the
Power Control Unit (PCU) (1).



EFF :
ALL
 27-54-51



AIJ




Page 413
Nov 01/10

INTENTIONALLY BLANK



R

 27-54-51



AIJ




Page 414
Nov 01/10

Subtask 27-54-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-51-991-001, 403/TASK 27-54-51-991-002)
Subtask 27-54-51-910-050
A. Preparation for the Installation
R
(1) To install the same Power Control Unit (PCU), clean the splined
surfaces of the connections with CLEANING AGENTS (Material No. 11002).
(2) Clean the mounting bushes and make sure that they are in a good
condition.
(3) Apply COMMON GREASE (Material No. 04-018) to the splines of the left
input universal joint (10) and the right input universal joint (35).
Subtask 27-54-51-420-051
B. Installation of the Power Control Unit
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
(1) Install the PCU (1) on the fuselage fitting as follows:
(a) Put the PCU (1) in position and install the attachment bolt (30),
the washer (20) and the nut (19).
(b) Attach the PCU (1) to the attachment rod assembly (3) with the
bolt (5), the bushes (6), the washer (7) and the nut (9).
(c) Attach the adjustable rod assembly (4) to the PCU (1) and install
the bolt (5), the bushes (6), the washer (7) and the nut (9).


EFF :
ALL
 27-54-51



AIJ




Page 415
Nov 01/08

(d) Put the bolt (31) through the attachment bolt (30) and install
the washer (18) and the nut (17).
(e) Tighten the nut (17) and safety it with lockwire, corrosionresistant steel, dia. 0.8 mm (0.032 in.).
(f) Tighten the nuts (9) and safety them with the new cotter pins
(8).
(2) At the bonding point continue as follows:
(a) Put the bonding jumper (40) in position.
(b) Attach the bonding jumper (40) with the washer (41) and the screw
(42) (Ref. TASK 20-28-00-912-004).
(c) Seal the screw (42) and the washer (41) with SEALANTS (Material
No. 09-013).
R

(d) Apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue) to the
bonding point.
(3) Engage the left input universal joint (10) of the PCU (1) in the left
input of the PCU.
(4) Engage the right input universal joint (35) of the PCU (1) in the
right input of the PCU.
(5) Install the left torque shaft 6202CM (13) as follows:
(a) Put the torque shaft (13) in position.
(b) Make sure that the flange holes of the torque shaft (13) are in
line with the flange holes of the input universal joint (10).
(c) If the flange holes of the torque shaft (13) are not in line with
the flange holes of the input universal joint (10), continue as
follows:
1
_

Remove the input universal joint (10).

2
_

Turn the input universal joint (10) by the number of splines


necessary to put it in line.



EFF :
ALL
 27-54-51



AIJ




Page 416
Nov 01/08

3
_

Install the input universal joint (10).

(d) Install the bolts (12) to connect the torque shaft (13) to the
input universal joint (10).
(e) Install the nuts (11) on the bolts (12).
(f) Examine the assembly of the input universal joint (10) as
follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.

(h) TORQUE the nuts (11) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the nuts (11)
and the bolts (12).
(6) Install the right torque shaft 6252CM (32) as follows:
(a) Put the torque shaft (32) in position.
(b) Make sure that the flange holes of the torque shaft (32) are in
line with the flange holes of the input universal joint (35).
(c) If the flange holes of the torque shaft (32) are not in line with
the flange holes of the input universal joint (35), continue as
follows:
1
_

Remove the input universal joint (35).

2
_

Turn the input universal joint (35) by the number of splines


necessary to put it in line.

3
_

Install the input universal joint (35).

(d) Install the bolts (12) to connect the torque shaft (32) to the
input universal joint (35).



EFF :
ALL
 27-54-51



AIJ




Page 417
Feb 01/07

(e) Install the nuts (11) on the bolts (12).


(f) Examine the assembly of the input universal joint (35) as
follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.

(h) TORQUE the nuts (11) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the nuts (11)
and the bolts (12).
(7) Remove the blanking caps from the electrical connectors.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(9) Connect the electrical connectors 3CN-A, 3CN-B, 24CV-A, 23CV-A,
27CV-B and 27CV-A.
(10) Install the clamps which connect the electrical leads to the PCU (1).
(11) Remove the blanks and the plugs from the line (52) ends and the PCU
(1).
(12) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the
line end-fittings.
(13) Connect the hydraulic lines (52) to the PCU (1).
(14) TORQUE the union nuts of the hydraulic lines (52) to between 5.4 and
5.9 m.daN (39.82 and 43.51 lbf.ft).
(15) Connect the case drain lines (59) and (60).
(16) TORQUE the union nuts of the case drain lines (59) and (60) to
between 1.5 and 1.7 m.daN (11.06 and 12.53 lbf.ft).



EFF :
ALL
 27-54-51



AIJ




Page 418
Feb 01/07

(17) Connect the seal drain lines (45) and secure them with the tie wraps
(46).
Subtask 27-54-51-860-052
C. Preparation for the Test
(1) Remove the CHECK-PIN TRACK 1-4 from the left and right flap track
positions 1.
R

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) from
the left torque shaft (6256CM) and from the right torque shaft
(6206CM) (Ref. TASK 27-50-00-000-003).
(3) Pressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Make sure that the level of the fluid in the reservoirs is correct.
Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 1212-29-611-002).
(5) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 2910-00-863-001) (Ref. TASK 29-10-00-863-002).

(6) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(7) Remove the warning notice(s).
Subtask 27-54-51-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-51-710-050
E. Test
(1) Do a Check of the Position Pick-Off Units (PPUs) on the Centralized
Fault Display System (CFDS)
(a) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the
Multipurpose Control Display Unit (MCDU) (Ref. TASK 31-32-00-860006).



EFF :
ALL
 27-54-51



AIJ




Page 419
Nov 01/08

(b) Do a check of the flap PPUs on the MCDU as follows:


R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
On the MCDU:
- push (in) the line key < SFCC 1. - the MCDU shows the SFCC 1 menu.
- push (in) the NEXT PAGE button.

- the MCDU shows the next page of the


SFCC 1 menu.

- push (in) the line key SYSTEM


DATA FLP >.

- the MCDU shows the SFCC 1 FLAP


SYSTEM DATA menu.

- push (in) the line key < PPU.

- the MCDU shows the PPU DATA page(s):


Refer to Table 1.

- compare this indication with the


indication before the removal of
the PCU. If the indications does
not agree, do an adjustment of
the applicable position pick-off
unit (Ref. TASK 27-51-00-820001).
- push the line key < Return
frequently until the CFDS menu
page is shown.
------------------------------------------------------------------------------|
|
|
SFCC 1
|
|
PPU DATE (DEG)
|
|
DATE:XXX XX UTC:XXXX
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
|
|
***HEX ***HEX ***HEX
***
|
|-----------------------------------------------------------------------------|
|
OTHER SFCC
|
|
LH APPU FPPU RH APPU
|
|
***.*
***.*
***.*
***
|
|
***HEX ***HEX ***HEX
|
|-----------------------------------------------------------------------------|
|
<RETURN
PRINT>
|
|-----------------------------------------------------------------------------|
|
Table 1
|



EFF :
ALL
 27-54-51



AIJ




Page 420
Feb 01/11

------------------------------------------------------------------------------| PPU DATA (DEG) displayed on the MCDU at the flap position FULL
|
|
|
------------------------------------------------------------------------------(2) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-54-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the container from below the PCU (1).
(3) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).
(4) Remove the access platform(s).



EFF :
ALL
 27-54-51


R 
AIJ




Page 421
Feb 01/11

BRAKE - PRESSURE OFF, FLAPS PCU - REMOVAL/INSTALLATION


______________________________________________________
TASK 27-54-52-000-001
Removal of the Pressure-Off Brake of the Flap Power Control Unit
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27508625000
98D27803000000

1
1
1
2
1

blanking plugs
circuit breaker(s) safety clip(s)
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-52



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
R

27-50-00-866-009
27-54-00-820-001
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-54-52-991-003
27-54-52-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Adjustment of the Flap Drive System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-52-866-050
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-52-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-52-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-52



AIJ




Page 402
Nov 01/09

Subtask 27-54-52-860-050
D. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-001).
R

(4) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.
(5) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the left and
right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-52-991-003)
(a) If you cannot install the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the L/H (R/H) flap drive system (Ref. TASK 27-5400-820-001).
(6) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-52-991-001)
Subtask 27-54-52-020-050
A. Removal of the Pressure-Off Brake
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the pressure-off brake at the valve
____
block 23CV is given. The removal procedure for the pressure-off
brake at the valve block 24CV is almost the same. The differences
in the procedures are given.



EFF :
ALL
 27-54-52



AIJ




Page 403
Nov 01/10

R
R

Installation of the Check Pin Track 1-4


Figure 401/TASK 27-54-52-991-003



EFF :
ALL
 27-54-52



AIJ




Page 404
Feb 01/07

R
R

Pressure-Off Brake
Figure 402/TASK 27-54-52-991-001



EFF :
ALL
 27-54-52



AIJ




Page 405
Feb 01/07

(1) Remove the Pressure-Off Brake (POB) (41) together with the hydraulic
motor (7) and the valve block assembly (23) from the differential
gearbox.
(a) Disconnect the hydraulic lines (11).
(b) Remove the tie wrap (9) and disconnect the seal drain line (10).
(c) Disconnect the case drain line (8).
(d) Install the blanking caps on the open line ends (8),(10),(11).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connector (22) from the valve block
assembly (23).
(g) Put blanking caps on the disconnected electrical connectors and
receptacles.
(h) Remove the bolts (3) and the washers (2).
(i) Support the POB (41), the valve block assembly (23) and the
hydraulic motor (7).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the POB (41) together with the hydraulic motor (7) and the
valve block assembly (23).
(2) Remove the POB (41) from the hydraulic motor (7) and the valve block
assembly (23).
(a) Remove the bolts (6) and the washers (5).
(b) Carefully remove the hydraulic motor (7) from the POB (41) and
from the transfer tubes (14) on the valve block assembly (23).
(c) Remove and discard the O-ring (4).
(d) Carefully remove the POB (41) from the transfer tube (33).
(3) Remove and discard the O-rings (13),(35) and the back-up rings
(12),(34) from the transfer tubes (14),(33).
(4) Remove and discard the locking rings (21),(30) from the transfer
tubes (14),(33).



EFF :
ALL
 27-54-52



AIJ




Page 406
Feb 01/07

(5) Remove the transfer tubes (14),(33) from the valve block assembly
(23).
(6) Remove and discard the back-up rings (15),(31) and the O-rings
(20),(32) from the transfer tubes (14),(33).



EFF :
ALL
 27-54-52



AIJ




Page 407
Feb 01/07

TASK 27-54-52-400-001
Installation of the Pressure-Off Brake of the Flap Power Control Unit
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

No specific
R
R

No specific
98D27508625000
98D27803000000

tie wrap
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-52



AIJ




Page 408
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-002


Material No. 05-054

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

Material No. 06-001


R
R

Material No. 11-026


Material No. 19-003
C. Expendable Parts

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

O-ring
back-up
O-rings
back-up
O-rings
locking
locking
back-up
O-rings
back-up
O-rings

27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51

rings
rings
rings
ring
rings
rings



EFF :
ALL
 27-54-52



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-140
-180
-190
-200
-190
-200

Page 409
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-54-52-991-003
27-54-52-991-001
27-54-52-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-54-52-860-054
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the main gear main door opening.
(4) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-54-52



AIJ




Page 410
Feb 01/08

(6) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.
(7) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
(8) Make sure that the CHECK-PIN TRACK 1-4 (98D27508625000) is in
position in the left and right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-52-991-003)
Subtask 27-54-52-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-52-991-001)
Subtask 27-54-52-860-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-52



AIJ




Page 411
Nov 01/10

(3) Use a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003) and
the CLEANING AGENTS (Material No. 11-026) to fully remove the
anti-corrosion compound from:
- the mating faces of the POB
- the mating face of the hydraulic motor
- the mating face of the PCU.

(4) Prepare a small quantity of a mixture of:


- 58 % of the zinc chromate putty SPECIAL MATERIALS (Material No. 05002) and
- 42 % of the zinc powder SPECIAL MATERIALS (Material No. 05-054).
(5) Apply
- the
- the
- the

a quantity of the prepared mixture to:


mating faces of the POB
mating face of the hydraulic motor
mating face of the PCU.

(6) Apply the LUBRICANTS (Material No. 06-001) to the splined surfaces.
(7) If installed, remove the screw, the protection cap and the packing
from the replacement pressure-off brake.
(Ref. Fig. 403/TASK 27-54-52-991-002)
Subtask 27-54-52-420-050
B. Installation of the Pressure-Off Brake
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.



EFF :
ALL
 27-54-52



AIJ




Page 412
Aug 01/11

R
R

Pressure-Off Brake - Removal of Storage Parts


Figure 403/TASK 27-54-52-991-002



EFF :
ALL
 27-54-52



AIJ




Page 413
Feb 01/07

NOTE : The installation procedure for the POB at the valve block 23CV is
____
given. The installation procedure for the POB at the valve block
24CV is almost the same. The differences in the procedures are
given.
(1) Install the new back-up rings (12), back-up rings (15) and the new Orings (13), O-rings (20) on the transfer tubes (14).
(2) Install the O-ring (4) to the POB (41).
(3) Install the new back-up rings (31), back-up rings (34) and the new Orings (32), O-rings (35) on the transfer tube (33).
(4) Put the transfer tubes (14),(33) in their related holes in the valve
block assembly (23).
(5) Safety the transfer tubes (14),(33) with the new locking rings (21),
locking ring (30).
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
bolts (6).
(7) Carefully install the hydraulic motor (7) on the transfer tubes (14)
of the valve block assembly (23).
(8) Carefully install the POB (41) on the transfer tube (33).
(9) Attach the POB (41) to the hydraulic motor (7) with the washers (5)
and the bolts (6).
(10) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).
(11) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23).
(a) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23) together to the differential gearbox.
(b) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the studs (42) and to the threads of the bolts (3).
(c) Attach the POB (41) and the valve block assembly (23) to the
differential gearbox (40) with:
- the washers (2),
- the bolts (3),
- the washers (25).



EFF :
ALL
 27-54-52



AIJ




Page 414
Feb 01/07

(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(12) Connect the hydraulic lines.
(a) Remove the blanking caps and the blanking plugs from the line
ends (8),(10),(11) and from the PCU (1).
(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of
the line end-fittings.
(d) Connect the case drain line (8).
(e) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(f) Connect the seal drain line (10) and attach it with the new tie
wrap (9).
(g) Connect the hydraulic lines (11).
(h) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(13) Connect the electrical connector.
(a) Remove the blanking caps from the electrical connector (22).
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(c) Connect the electrical connector (22) to the valve block assembly
(23).
Subtask 27-54-52-860-051
C. Preparation for the Test
(1) Remove the CHECK-PIN TRACK 1-4 (98D27508625000) from the left and
right flap track positions 1.
(2) Pressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-002).



EFF :
ALL
 27-54-52


R 
AIJ




Page 415
Feb 01/07

(3) Make sure that the level of the fluid in the related hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
R

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(5) Remove the warning notice(s).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-52-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV
Subtask 27-54-52-710-050
E. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line (10).
5. Close-up
________
Subtask 27-54-52-860-053
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-54-52-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-52



AIJ




Page 416
Feb 01/08

VALVE BLOCK - FLAP PCU (23CV,24CV) - REMOVAL/INSTALLATION


_________________________________________________________
TASK 27-54-53-000-001
Removal of the Valve Blocks 23CV, 24CV of the Power Control Unit (Flap)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the valve block 23CV is specified. The removal
____
procedure for the valve block 24CV is almost the same. If there are
differences in the procedures they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27508625000
98D27803000000

1
1
1
2
1

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
ACCESS PLATFORM 3M (10 FT)
CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
R

27-50-00-866-009
27-54-00-820-001
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-54-53-991-004
27-54-53-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Adjustment of the Flap Drive System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-53-866-050
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-53-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-53-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-53



AIJ




Page 402
May 01/09

Subtask 27-54-53-860-050
D. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 3M (10 FT) in position at the main gear main
door opening.
(2) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-001).
R

(4) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.
(5) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
(6) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the left and
right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-53-991-004)
(a) If you cannot install the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the L/H (R/H) flap drive system (Ref. TASK 27-5400-820-001).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-53-991-001)
Subtask 27-54-53-020-050
A. Removal of the Valve Block
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
(1) To remove the valve block assembly (23), you must remove it together
with the Pressure-Off Brake (POB) (41) and the hydraulic motor (7)
from the differential gearbox (40):
(a) Disconnect the hydraulic lines (11).



EFF :
ALL
 27-54-53



AIJ




Page 403
Nov 01/10

R
R

Installation of the Check Pin Track 1-4


Figure 401/TASK 27-54-53-991-004



EFF :
ALL
 27-54-53



AIJ




Page 404
Feb 01/07

R
R

Valve Block
Figure 402/TASK 27-54-53-991-001



EFF :
ALL
 27-54-53



AIJ




Page 405
Feb 01/07

(b) Remove the tie wrap (9) and disconnect the seal drain line (10).
(c) Disconnect the case drain line (8).
(d) Install the blanking caps on the open line ends (8),(10),(11).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connector (22) from the valve block
assembly (23).
R

(g) Put blanking caps on the disconnected electrical connector(s).


(h) Remove the bolts (3) and the washers (2).
(i) Support the POB (41), the valve block assembly (23) and the
hydraulic motor (7).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the valve block assembly (23), the POB (41) and the
hydraulic motor (7) together from the differential gearbox (40).
(2) Remove the valve block assembly (23) from the POB (41) and the
hydraulic motor (7):
(a) Remove the bolts (6) and the washers (5).
(b) Carefully remove the hydraulic motor (7) from the POB (41) and
from the transfer tubes (14) on the valve block assembly (23).
(c) Remove and discard the packing (4).
(d) Carefully remove the POB (41) from the transfer tube (33).
(3) Remove and discard the packings (13), (35) and the retainer (12),
(34) from the transfer tubes (14), (33).
(4) Remove and discard the lockwashers (21) and retaining rings (30) from
the transfer tubes (14), (33).
(5) Remove the transfer tubes (14), (33) from the valve block assembly
(23).
(6) Remove and discard the retainer rings (15), (31) and the packings
(20), (32) from the transfer tubes (14), (33).



EFF :
ALL
 27-54-53



AIJ




Page 406
Nov 01/10

TASK 27-54-53-400-001
Installation of the Valve Blocks 23CV, 24CV of the Power Control Unit (Flap)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the valve block 23CV is specified. The
____
installation procedure for the valve block 24CV is almost the same. If
there are differences in the procedures, they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

No specific
R
R

No specific
98D27508625000
98D27803000000

tie wrap
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 407
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 05-002

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


Material No. 06-001
R
R

Material No. 11-026

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

packing
retainer
packings
retainer
packings
lock washers
retaining ring
retainer
packings
retainer
packings

27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51
27-54-51



EFF :
ALL
 27-54-53



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-140
-180
-190
-200
-190
-200

Page 408
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-54-53-991-004
27-54-53-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-53-860-056
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the main gear main door opening.
(4) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-54-53



AIJ




Page 409
Feb 01/08

(6) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.
(7) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
(8) Make sure that the CHECK-PIN TRACK 1-4 (98D27508625000) are in
position in the left and right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-53-991-004)
Subtask 27-54-53-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-53-991-001)
Subtask 27-54-53-860-054
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R

(1) Use CLEANING AGENTS (Material No. 11-026) and remove all signs of
anti-corrosion compound from:
- the mating face of the Pressure-Off Brake (POB),
- the mating face of the Power Control Unit (PCU).
(2) Prepare a small quantity of a mixture of 58 % SPECIAL MATERIALS
(Material No. 05-002) and 42 % SPECIAL MATERIALS (Material No. 05054).



EFF :
ALL
 27-54-53



AIJ




Page 410
Aug 01/11

(3) Apply a quantity of the mixture prepared to:


- the mating face of the POB,
- the mating face of the PCU.
(4) Apply LUBRICANTS (Material No. 06-001) to the splined surfaces.
Subtask 27-54-53-420-050
B. Installation of the Valve Block
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
R
R

(1) Install the new retainer (12), retainer (15) and the new packings
(13), packings (20) on the transfer tubes (14).

(2) Install the packing (4) to the POB (41).

R
R

(3) Install the new retainer (31), retainer (34) and the new packings
(32), packings (35) on the transfer tube (33).

R
R

(4) Put the transfer tubes (14), (33) in their related holes in the valve
block assembly (23).

R
R

(5) Safety the transfer tubes (14), (33) with the new lock washers (21)
and the new retaining ring (30).
NOTE : Install the valve block assembly (23) together with the POB
____
(41) and the hydraulic motor (7) to the differential gear box
(40).



EFF :
ALL
 27-54-53



AIJ




Page 411
May 01/09

(6) Install the POB (41) with the hydraulic motor (7) on the valve block
assembly (23):
(a) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the bolts (6).
(b) Carefully install the hydraulic motor (7) on the transfer tubes
(14) of the valve block assembly (23).
(c) Carefully install the POB (41) on the transfer tube (33).
(d) Attach the POB (41) to the hydraulic motor (7) with the washers
(5) and the bolts (6).
(e) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and
84.95 lbf.in).
(7) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23):
(a) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the studs (42) and to the threads of the bolts (3).
(b) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23) together to the differential gearbox (40).
(c) Attach the POB (41) and the valve block assembly (23) to the
differential gearbox (40) with:
- the washers (2),
- the bolts (3),
- the washers (25).
(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(8) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange,
- hydraulic motor flange,
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(9) Connect the hydraulic lines:
R

(a) Remove the blanking caps from the line ends (8), (10), (11).
(b) Make sure that the hydraulic line end-fittings are serviceable.



EFF :
ALL
 27-54-53



AIJ




Page 412
May 01/09

(c) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of


the line end-fittings.
(d) Remove the blanking plugs from the ports of the PCU (1).
(e) Connect the seal drain line (10) and attach it with the new tie
wrap (9).
(f) Connect the case drain line (8).
(g) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(h) Connect the hydraulic lines (11).
(i) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(10) Connect the electrical connector (22):
(a) Remove the blanking cap from the electrical connector (22).
(b) Remove the blanking cap from the receptacle.
(c) Make sure that the electrical connectors are clean and in the
correct condition.
(d) Connect the electrical connector (22) to the valve block assembly
(23).
Subtask 27-54-53-860-053
C. Preparation for the Test
(1) Remove the CHECK-PIN TRACK 1-4 from the left and right flap track
positions 1.
(2) Pressurize the reservoirs of the Green and the Yellow hydraulic
systems (Ref. TASK 29-14-00-614-002).
(3) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
R

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.



EFF :
ALL
 27-54-53



AIJ




Page 413
Feb 01/08

(5) Remove the warning notice(s).


(6) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-54-53-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV
Subtask 27-54-53-710-050
E. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line.
5. Close-up
________
Subtask 27-54-53-860-055
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-54-53-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-53


R 
AIJ




Page 414
Feb 01/07

TASK 27-54-53-000-002
Removal of the Solenoid Valves of the Power Control Unit (Flap)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the retract solenoid valve of the valve block
____
23CV is specified. The removal procedure for the extend solenoid valve,
the brake solenoid valve and the solenoid valves of the valve block 24CV
are almost the same. If there are differences in the procedures, they
are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


warning notice

R
R

No specific
No specific
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 415
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-866-009
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-54-53-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 403

3. __________
Job Set-up
Subtask 27-54-53-866-051
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-53-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-53-010-051
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-53



AIJ




Page 416
Feb 01/08

Subtask 27-54-53-860-051
D. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main gear main door.
(2) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and the Yellow hydraulic
systems (Ref. TASK 29-14-00-614-001).
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Put a container in position below the valve block (12).
4. Procedure
_________
(Ref. Fig. 403/TASK 27-54-53-991-002)
Subtask 27-54-53-020-051
A. Removal of the Solenoid Valves
CAUTION : DO NOT INSTALL THE REMOVED SOLENOID VALVES WITH THE PARTNUMBER
_______
903A0000-01 ON THE WING TIP BRAKE. THIS CAN CAUSE MALFUNCTION
OF THE WING TIP BRAKE.
(1) Remove the bolts (4) and the washers (5).
(2) Install one of the bolts (4) in hole A in the solenoid valve (1).
(3) Use this bolt and carefully remove the solenoid valve (1) from the
valve block (12).
(4) Remove the bolt (4) from hole A in the solenoid valve (1).
(5) Remove and discard the packings (9), (10), (15), (16) and the back-up
rings (7), (6) from the solenoid valve (1).



EFF :
ALL
 27-54-53



AIJ




Page 417
Feb 01/11

Solenoid Valve
Figure 403/TASK 27-54-53-991-002



EFF :
ALL
 27-54-53



AIJ




Page 418
May 01/09

TASK 27-54-53-400-002
Installation of the Solenoid Valves of the Power Control Unit (Flap)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the retract solenoid valve of the valve
____
block 23CV is specified. The removal procedure for the extend solenoid
valve, the brake solenoid valve and the solenoid valves of the valve
block 24CV are almost the same. If there are differences in the
procedures, they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27803000000

1 ACCESS PLATFORM 3M (10 FT)


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 419
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6
7
9
10
15
16

back-up ring
back-up ring
packing
packing
packing
packing

27-54-53
27-54-53
27-54-53
27-54-53
27-54-53
27-54-53

01
01
01
01
01
01

-130
-120
-110
-100
-150
-140

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-54-53-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 403



EFF :
ALL
 27-54-53


R 
AIJ




Page 420
May 01/11

3. __________
Job Set-up
Subtask 27-54-53-860-057
A. Aircraft Maintenance Configuration
(1) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the
main gear main door opening.
(4) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

(7) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the


Power Control Unit (PCU) (1).
Subtask 27-54-53-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-53



AIJ




Page 421
May 01/11

4. Procedure
_________
(Ref. Fig. 403/TASK 27-54-53-991-002)
Subtask 27-54-53-420-051
A. Installation of the Solenoid Valve
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
R
R

(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the back-up ring (6),
the back-up ring (7), the packing (9), and the packing (10).

R
R

(4) Install the new back-up rings (6), (7) and the new packings (9),
(10), packing (15), packing (16) on the solenoid valve (1).
(5) Carefully install the solenoid valve (1) to the valve block (12).
(6) Install the washers (5) and the bolts (4).
(7) TORQUE the bolts (4) to between 0.25 and 0.27 m.daN (22.12 and 23.89
lbf.in).
Subtask 27-54-53-860-059
B. Preparation for the Test
(1) Pressurize the reservoirs of the Green and the Yellow hydraulic
systems (Ref. TASK 29-14-00-614-002).
(2) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001), (Ref. TASK 12-12-29-611-002).
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the warning notice(s).



EFF :
ALL
 27-54-53



AIJ




Page 422
May 01/09

Subtask 27-54-53-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-53-710-051
D. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Examine the solenoid valve and make sure that there are no leaks.
5. Close-up
________
Subtask 27-54-53-860-058
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001), (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the valve block (12).
(3) Remove the access platform(s).
Subtask 27-54-53-410-051
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-53


R 
AIJ




Page 423
Feb 01/07

TASK 27-54-53-000-003
Removal of the Filters of the Valve Blocks
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the filter of the valve block 24CV is
____
specified. The removal procedure for the filter of the valve block 23CV
is almost the same. If there are differences in the procedures they are
specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


warning notice

R
R

No specific
No specific
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 424
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-54-53-991-003

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 404

3. __________
Job Set-up
Subtask 27-54-53-865-056
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-53-010-052
B. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).
Subtask 27-54-53-860-052
C. Aircraft Maintenance Configuration
(1) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
R

(2) Put the ACCESS PLATFORM 3M (10 FT) in position at the opening of the
main gear main door.
(3) Make sure that the Green and the Yellow hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Depressurize the reservoirs of the Green and the Yellow hydraulic
systems (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-54-53



AIJ




Page 425
Feb 01/11

(5) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(6) Put a container in position below the valve block (1).
4. Procedure
_________
R

(Ref. Fig. 404/TASK 27-54-53-991-003)


Subtask 27-54-53-020-052
A. Removal of the Filter
(1) Cut, remove and discard the lockwire.
(2) Remove the filter (3) from the valve block (1).
(3) Remove and discard the O-ring (2) from the filter (3).



EFF :
ALL
 27-54-53



AIJ




Page 426
Feb 01/07

R
R

Filter
Figure 404/TASK 27-54-53-991-003



EFF :
ALL
 27-54-53



AIJ




Page 427
Feb 01/07

TASK 27-54-53-400-003
Installation of the Filters of the Valve Blocks
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the filter of the valve block 24CV is
____
specified. The installation procedure for the filter of the valve block
23CV is almost the same. If there are differences in the procedures they
are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27803000000

1 ACCESS PLATFORM 3M (10 FT)


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-53



AIJ




Page 428
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003

lockwire, corrosion-resistant steel dia. 0.6 mm


(0.24 in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2

O-ring

27-84-53 01 -060

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-54-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-54-53-991-003

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Operational Test of the Flap System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 404

3. __________
Job Set-up
Subtask 27-54-53-860-060
A. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.



EFF :
ALL
 27-54-53


R 
AIJ




Page 429
May 01/11

(2) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the
main gear main door opening.
(3) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the reservoirs of the Green and the Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(5) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

(6) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the


Power Control Unit (PCU) (1).
Subtask 27-54-53-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-53-991-003)
Subtask 27-54-53-420-052
A. Installation of the Filter
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-53



AIJ




Page 430
May 01/11

(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the O-ring (2) and to
the threads of the filter (3).
(4) Install the new O-ring (2) on the filter (3).
(5) Install the filter (3) complete with the O-ring (2) in the valve
block (1).
(6) TORQUE the filter (3) to between 4.0 and 4.5 m.daN (29.49 and 33.18
lbf.ft).
(7) Safety the filter (3) with the lockwire, corrosion-resistant steel
dia. 0.6 mm (0.24 in.).
Subtask 27-54-53-860-062
B. Preparation for the Test
(1) Pressurize the reservoirs of the Green and the Yellow hydraulic
systems (Ref. TASK 29-14-00-614-002).
(2) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
R

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the warning notice(s).
Subtask 27-54-53-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV
Subtask 27-54-53-710-052
D. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Examine the filter (3) and make sure that there are no leaks.



EFF :
ALL
 27-54-53



AIJ




Page 431
Feb 01/08

5. Close-up
________
Subtask 27-54-53-860-061
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the valve block (1).
(3) Remove the access platform(s).
Subtask 27-54-53-410-052
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-53


R 
AIJ




Page 432
Feb 01/07

MOTOR - HYDRAULIC, FLAPS PCU - REMOVAL/INSTALLATION


___________________________________________________
TASK 27-54-54-000-001
Removal of the Hydraulic Motor of the Flap Power Control-Unit (6201CM) with the
Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27508625000
98D27803000000

1
1
1
2
1

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-54



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
R

27-50-00-866-009
27-54-00-820-001
27-54-54-000-002
29-10-00-864-001
29-10-00-864-002
29-14-00-614-001
32-12-00-010-001
27-54-54-991-003
27-54-54-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Adjustment of the Flap Drive System
Removal of the Hydraulic Motor of the Flap Power
Control-Unit (6201CM) without the Pressure-Off Brake
and the Valve Block Assembly
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-54-866-050
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-54-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-54-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-54



AIJ




Page 402
Nov 01/09

Subtask 27-54-54-860-050
D. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(3) Depressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-001)
R

(4) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.
(5) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the left and
right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-54-991-003)
(a) If you cannot install the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the L/H (R/H) flap drive system (Ref. TASK 27-5400-820-001).
(6) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the Power Control
Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-54-991-001)
Subtask 27-54-54-020-050
A. Removal of the Hydraulic Motor
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the hydraulic motor which is attached to
____
the valve block 23CV is given. The removal procedure for the
hydraulic motor which is attached to the valve block 24CV is
almost the same. The differences in the procedures are given in
the steps that follow.



EFF :
ALL
 27-54-54



AIJ




Page 403
Nov 01/10

R
R

Installation of the Check Pin Track 1-4


Figure 401/TASK 27-54-54-991-003



EFF :
ALL
 27-54-54



AIJ




Page 404
Feb 01/07

R
R

Hydraulic Motor
Figure 402/TASK 27-54-54-991-001



EFF :
ALL
 27-54-54



AIJ




Page 405
Feb 01/07

(1) This task gives the removal procedure of the hydraulic motor (7) at
the same time with the Pressure-Off Brake (POB) (41) and the valve
block assembly (23) from the differential gear box (40). If it is
necessary to remove only the hydraulic motor (7), refer to (Ref. TASK
27-54-54-000-002).
(a) Disconnect the hydraulic lines (11).
(b) Disconnect the case drain line (8) from the hydraulic motor (7).
(c) Remove and discard the tie wrap (9) and disconnect the seal drain
line (10) from the POB (41).
(d) Install the blanking caps on the open line ends (8),(10),(11).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connectors (22) from the valve block
assembly (23).
(g) Put blanking caps on the disconnected electrical connectors and
receptacles.
(h) Remove the bolts (3) and the washers (2).
(i) Support the hydraulic motor (7), the POB (41) and the valve block
assembly (23).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the valve block assembly (23) together with the POB (41)
and the hydraulic motor (7).
(2) Remove the hydraulic motor (7) from the valve block assembly (23) and
the POB (41).
(a) Remove the bolts (6) and the washers (5).
(b) Carefully remove the hydraulic motor (7) from the POB (41) and
from the transfer tubes (14) on the valve block assembly (23).
(c) Remove and discard the O-ring (4).
(d) Carefully remove the POB (41) from the transfer tube (33).
(3) Remove and discard the O-rings (13),(35) and the back-up rings
(12),(34) from the transfer tubes (14).



EFF :
ALL
 27-54-54



AIJ




Page 406
Feb 01/07

(4) Remove and discard the locking rings (21),(30) from the transfer
tubes (14),(33).
(5) Remove the transfer tubes (14),(33) from the valve block assembly
(23).
(6) Remove and discard the back-up rings (15),(31) and the O-rings
(20),(32) from the transfer tubes (14),(33).



EFF :
ALL
 27-54-54



AIJ




Page 407
Feb 01/07

TASK 27-54-54-400-001
Installation of the Hydraulic Motor of the Flap Power Control-Unit (6201CM)
with the Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific
R
R

No specific
98D27508625000
98D27803000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-54



AIJ




Page 408
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-002


Material No. 05-054

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

Material No. 06-001


R
R

Material No. 11-026


C. Expendable Parts

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

O-ring
back-up
O-rings
back-up
O-rings
locking
locking
back-up
O-rings
back-up
O-rings

27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51

rings
rings
rings
ring
rings
rings



EFF :
ALL
 27-54-54



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-140
-180
-190
-200
-190
-200

Page 409
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
27-54-54-400-002
29-10-00-863-001
29-10-00-863-002
29-10-00-864-001
29-10-00-864-002
29-14-00-614-001
29-14-00-614-002
32-12-00-010-001
32-12-00-410-001
27-54-54-991-003
27-54-54-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Installation of the Hydraulic Motor of the Flap Power
Control-Unit (6201CM) without the Pressure-Off Brake
and the Valve Block Assembly
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-54-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
(2) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
R
R

(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the
slat/flap control lever.



EFF :
ALL
 27-54-54



AIJ




Page 410
Feb 01/08

(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(5) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(6) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(7) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the Green and Yellow hydraulic systems.
(8) Make sure that the CHECK-PIN TRACK 1-4 is installed in the left and
right flap-track positions 1.
(Ref. Fig. 401/TASK 27-54-54-991-003)
(9) Make sure that a CONTAINER 5 L(1 1/2 USGAL) is in position below the
Power Control Unit (PCU) (1).
Subtask 27-54-54-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-54



AIJ




Page 411
Nov 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-54-54-991-001)
Subtask 27-54-54-910-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
R

(3) Use CLEANING AGENTS (Material No. 11-026) and fully remove the
anti-corrosion compound from:
- the contact face of the hydraulic motor,
- the contact faces of the Pressure-Off Brake (POB),
- the contact face of the Power Control Unit (PCU).
(4) Prepare a small quantity of a mixture of 58 % SPECIAL MATERIALS
(Material No. 05-002) and 42 % SPECIAL MATERIALS (Material No. 05054).
(5) Apply
- the
- the
- the

a quantity of the prepared mixture to:


contact face of the hydraulic motor,
contact faces of the POB,
contact face of the PCU.

(6) Apply LUBRICANTS (Material No. 06-001) to the splined surfaces.



EFF :
ALL
 27-54-54



AIJ




Page 412
Aug 01/11

Subtask 27-54-54-420-051
B. Installation of the Hydraulic Motor
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation procedure for the hydraulic motor which is
____
attached to the valve block 23CV is given. The installation
procedure for the hydraulic motor which is attached to the valve
block 24CV is almost the same. The differences in the procedures
are given in the steps that follow.
(1) Install the back-up rings (12), back-up rings (15) and the O-rings
(13), O-rings (20) on the transfer tubes (14).
(2) Install the O-ring (4) on the POB (41).
(3) Install the new back-up rings (31), back-up rings (34) and the new Orings (32), O-rings (35) on the transfer tube (33).
(4) Put the transfer tubes (14),(33) in their related holes in the valve
block assembly (23).
(5) Safety the transfer tubes (14),(33) with the new locking rings (21)
and the new locking ring (30).
(6) This procedure gives the installation procedure of the hydraulic
motor (7) at the same time with the POB (41) and the valve block
assembly (23). If it is necessary to install only the hydraulic motor
(7), refer to (Ref. TASK 27-54-54-400-002).



EFF :
ALL
 27-54-54


R 
AIJ




Page 413
Feb 01/07

(7) Install the hydraulic motor (7) with the POB (41) on the valve block
assembly (23).
(8) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads of
the bolts (6).
(9) Carefully install the hydraulic motor (7) on the transfer tubes (14).
(10) Carefully install the POB (41) on the transfer tube (33).
(11) Attach the hydraulic motor (7) to the POB (41) with the washers (5)
and the bolts (6).
(12) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).
(13) Install the hydraulic motor (7) and the POB (41) and the valve block
assembly (23).
(a) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads
of the studs (42) and to the threads of the bolts (3).
(b) Install the hydraulic motor (7), the POB (41) and the valve block
assembly (23) at the same time to the differential gearbox (40).
(c) Attach the POB (41) and the valve block assembly (23) to the
differential gearbox (40) with:
- the washers (2)
- the bolts (3)
- the washers (25).
(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(14) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange
- hydraulic motor flange
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(15) Connect the hydraulic lines.
(a) Remove the blanking caps from the line ends (8),(10),(11).
(b) Remove the blanking plugs from the ports of the PCU (1).



EFF :
ALL
 27-54-54



AIJ




Page 414
Feb 01/07

(c) Make sure that the hydraulic line end-fittings are serviceable.
(d) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads
of the line end-fittings.
(e) Connect the case drain line (8) to the hydraulic motor (7).
(f) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(g) Connect the hydraulic lines (11) to the valve block assembly
(23).
(h) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(i) Connect the seal drain line (10) to the POB (41).
(16) Connect the electrical connector (22).
(a) Remove the caps from the electrical connectors (22).
(b) Connect the electrical connector (22) to the valve block assembly
(23).
Subtask 27-54-54-860-051
C. Preparation for the Test
(1) Remove the CHECK-PIN TRACK 1-4 from the left and right flap track
positions 1.
(2) Pressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-002).
(3) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-1000-863-001) (Ref. TASK 29-10-00-863-002).
R

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(5) Remove the warning notice(s).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-54-54



AIJ




Page 415
Feb 01/08

Subtask 27-54-54-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV
Subtask 27-54-54-710-050
E. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line (10).
5. Close-up
________
Subtask 27-54-54-860-052
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of fluid in the relevant hydraulic reservoir
is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-54-54-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-54


R 
AIJ




Page 416
Feb 01/07

TASK 27-54-54-000-002
Removal of the Hydraulic Motor of the Flap Power Control-Unit (6201CM) without
the Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27508625000
98D27803000000

1
1
1
1
2
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 3M (10 FT)
CAP - BLANKING
CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
CHECK-PIN TRACK 1-4
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-54



AIJ




Page 417
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
R

27-50-00-866-009
27-54-00-820-001
29-10-00-864-001
29-10-00-864-002
29-14-00-614-001
32-12-00-010-001
27-54-54-991-003
27-54-54-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retraction of the Flaps on the Ground
Adjustment of the Flap Drive System
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401
Fig. 403

3. __________
Job Set-up
Subtask 27-54-54-866-051
A. Retraction of the Flaps
(1) Retract the flaps to the 0 degree position (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-54-54-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-54-010-051
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-54-54



AIJ




Page 418
Nov 01/09

Subtask 27-54-54-860-054
D. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 3M (10 FT) in position at the opening of the
main door of the main gear.
(2) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(3) Depressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-001).
R

(4) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the Green and Yellow hydraulic systems.
(5) Install the CHECK-PIN TRACK 1-4 (98D27508625000) in the left and
right flap track positions 1.
(Ref. Fig. 401/TASK 27-54-54-991-003)
(a) If you cannot install the CHECK-PIN TRACK 1-4 easily, do the
adjustment of the L/H (R/H) flap drive system (Ref. TASK 27-5400-820-001).
(6) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the hydraulic
motor (5).
4. Procedure
_________
(Ref. Fig. 403/TASK 27-54-54-991-002)
Subtask 27-54-54-020-052
A. Removal of the Hydraulic Motor
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the hydraulic motor which is attached to
____
the valve block 23CV is given. The removal procedure for the
hydraulic motor which is attached to the valve block 24CV is
almost the same. The differences in the procedures are given in
the steps that follow.



EFF :
ALL
 27-54-54



AIJ




Page 419
Nov 01/10

R
R

Removal of the Hydraulic Motor of the Flap Power Control-Unit (6201CM)


Figure 403/TASK 27-54-54-991-002



EFF :
ALL
 27-54-54



AIJ




Page 420
Feb 01/07

(1) Disconnect the case drain line (4) from the hydraulic motor (5).
(2) Install the CAP - BLANKING on the open line end (4).
(3) Remove the bolts (3) and the washers (2).
(4) Carefully remove the hydraulic motor (5) from the POB (9) and from
the transfer tubes (8).
(5) Remove and discard the O-ring (1).
(6) Remove and discard the O-rings (7) and the back-up rings (6) from the
transfer tubes (8).



EFF :
ALL
 27-54-54



AIJ




Page 421
Feb 01/07

TASK 27-54-54-400-002
Installation of the Hydraulic Motor of the Flap Power Control-Unit (6201CM)
without the Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

No specific
98D27508625000
98D27803000000

1 ACCESS PLATFORM 3M (10 FT)


1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 CHECK-PIN TRACK 1-4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-54



AIJ




Page 422
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 05-002

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


Material No. 06-001
R
R

Material No. 11-026

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
6
7

O-ring
back-up rings
O-rings

27-84-51 01 -070
27-84-51 01 -150
27-84-51 01 -160

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-866-009
27-54-00-710-001
29-10-00-863-001
29-10-00-863-002
29-10-00-864-001
29-10-00-864-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retraction of the Flaps on the Ground
Operational Test of the Flap System
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System



EFF :
ALL
 27-54-54



AIJ




Page 423
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-14-00-614-001
29-14-00-614-002
32-12-00-010-001
32-12-00-410-001
27-54-54-991-003
27-54-54-991-002

Depressurization of the Hydraulic Reservoirs


Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 403

3. __________
Job Set-up
Subtask 27-54-54-860-055
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
(2) Make sure that the flaps are retracted to the 0 degree position
(Ref. TASK 27-50-00-866-009).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the
slat/flap control lever.
(4) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the
opening of the main door of the main gear.
(5) Make sure that the Green and Yellow hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(6) Make sure that the reservoirs of the Green and Yellow hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
(7) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the Green and Yellow hydraulic systems.
(8) Make sure that the CHECK-PIN TRACK 1-4 (98D27508625000) is installed
in the left and right flap-track positions 1.
(Ref. Fig. 401/TASK 27-54-54-991-003)
(9) Make sure that a CONTAINER 5 L(1 1/2 USGAL) is in position below the
hydraulic motor (5).



EFF :
ALL
 27-54-54


R 
AIJ




Page 424
Aug 01/11

Subtask 27-54-54-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 403/TASK 27-54-54-991-002)
Subtask 27-54-54-910-053
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
R

(3) Use the CLEANING AGENTS (Material No. 11-026) and fully remove the
anti-corrosion compound from:
- the mating face of the hydraulic motor
- the mating face of the Pressure-Off Brake (POB).
(4) Prepare a small quantity of a mixture of 58 % of the SPECIAL
MATERIALS (Material No. 05-002) and 42 % of the SPECIAL MATERIALS
(Material No. 05-054).
(5) Apply a quantity of the prepared mixture to:
- the mating face of the hydraulic motor
- the mating faces of the POB.
(6) Apply the LUBRICANTS (Material No. 06-001) to the splined surfaces.



EFF :
ALL
 27-54-54



AIJ




Page 425
Aug 01/11

Subtask 27-54-54-420-052
B. Installation of the Hydraulic Motor
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation procedure for the hydraulic motor which is
____
attached to the valve block 23CV is given. The installation
procedure for the hydraulic motor which is attached to the valve
block 24CV is almost the same. The differences in the procedures
are given in the steps that follow.
(1) Install the new back-up rings (6) and the new O-rings (7) on the
transfer tubes (8).
(2) Install the new O-ring (1) on the POB (9).
(3) Install the hydraulic motor on the POB.
(a) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads
of the bolts (3).
(b) Engage the splines on the shaft of the POB (9) with those in the
hydraulic motor (5).
(c) Carefully install the hydraulic motor (5) on the transfer tubes
(8).
(d) Attach the hydraulic motor (5) to the POB (9) with the washers
(2) and the bolts (3).



EFF :
ALL
 27-54-54


R 
AIJ




Page 426
Aug 01/11

(e) TORQUE the bolts (3) to between 0.87 and 0.96 m.daN (76.99 and
84.95 lbf.in).
(4) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange
- hydraulic motor flange
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(5) Connect the hydraulic lines.
(a) Remove the blanking caps from the line end (4).
(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads
of the line end-fittings.
(d) Connect the case drain line (4) to the hydraulic motor (5).
(e) TORQUE the union nut of the case drain line (4) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
Subtask 27-54-54-860-056
C. Preparation for the Test
(1) Remove the CHECK-PIN TRACK 1-4 from the left and right flap-track
positions 1.
(2) Pressurize the reservoirs of the Green and Yellow hydraulic systems
(Ref. TASK 29-14-00-614-002).
(3) Pressurize the Green and Yellow hydraulic systems (Ref. TASK 29-1000-863-001) (Ref. TASK 29-10-00-863-002).
(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(5) Remove the warning notice(s).
(6) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-54-54


R 
AIJ




Page 427
Aug 01/11

Subtask 27-54-54-865-055
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV
Subtask 27-54-54-710-051
E. Test
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
5. Close-up
________
Subtask 27-54-54-860-057
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of fluid in the relevant hydraulic reservoir
is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the hydraulic motor (5).
(3) Remove the access platform(s).
Subtask 27-54-54-410-051
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-54-54


R 
AIJ




Page 428
Aug 01/11

LEVER ASSY - FLAP ACTUATOR - REMOVAL/INSTALLATION


_________________________________________________
TASK 27-54-55-000-001
Removal of the Flap-Actuator Lever Assembly - Tracks 1 and 2
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27508697000
98D27508698000

adjustable strut
circuit breaker(s) safety clip(s)
safety barriers
warning notice
warning notice(s)
access platform 2 m (6 ft. 7 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 EXTRACTOR - HOUSING, TRACK 2,3,4
1 EXTRACTOR-HOUSING,OUTB TR 3



EFF :
ALL
 27-54-55



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-002
27-50-00-400-003
27-50-00-866-008
27-54-49-000-001
27-54-49-000-002
27-60-00-866-002
32-12-00-010-001
53-35-11-000-001
57-51-33-000-001
57-51-37-000-002
R
57-55-11-000-001
27-54-55-991-001
27-54-55-991-004

Installation of the Inboard and Outboard Flap


Hoisting-Sling
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
Extension-Retraction of the Spoilers for Maintenance
Open the Main Gear Doors for Access
Removal of the Wing-to-Fuselage Fairings
Removal of the No.1 Flap Track Beam
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-55-941-067
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the flight controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-54-55-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).



EFF :
ALL
 27-54-55



AIJ




Page 402
Nov 01/09

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(3) For the track 2 lever assembly, fully extend the No. 1 Spoiler
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER COLLAR-SAFETY, SPOILER is
on the poiston rod of the servo-control.
Subtask 27-54-55-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-55-010-050
D. Get Access
(1) Put the access platform in position below the applicable zone 573 or
673.
(2) If necessary, remove the applicable access panels (Ref. TASK 53-3511-000-001):
- for the LH flap-actuator lever assembly, remove 193AB, 193BB
- for the RH flap-actuator lever assembly, remove 194AB, 194BB.
(3) Open the applicable MLG door zone 734(744) (Ref. TASK 32-12-00-010001).
R

(4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuating cylinder.
(5) Remove the No. 2 flap track movable fairing, but do not retract the
flaps or remove the fixed fairings (Ref. TASK 57-55-11-000-001).
(6) Remove the applicable access panel, 573BB or 673BB (Ref. TASK 57-5137-000-002).



EFF :
ALL
 27-54-55



AIJ




Page 403
Feb 01/08

Subtask 27-54-55-480-050
E. Installation of Support Equipment
R

(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on the


torque shafts outboard of the Track 2 actuator (Ref. TASK 27-50-00400-003).
(2) Install the inboard flap hoisting sling (Ref. TASK 27-50-00-400-002).
Subtask 27-54-55-020-055
F. Remove the Applicable Actuator:
- for the Track 1 actuator lever remove, 6205CM (6255CM) (Ref. TASK 2754-49-000-001)
- for the Track 2 actuator lever remove, 6211CM (6261CM) (Ref. TASK 2754-49-000-002).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-55-991-001, 402/TASK 27-54-55-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-55-020-053
A. Removal of the Flap-Actuator Lever Assembly - Track 1
CAUTION : SUPPORT THE FLAP ALONG THE FULL LENGTH OF THE TRAILING EDGE.
_______
THIS WILL PREVENT DAMAGE TO THE FLAP.
(1) Use the hoisting sling to hold the weight of the inboard flap.
(2) At the track 2 position:
(Ref. Fig. 402/TASK 27-54-55-991-004)
(a) Remove and discard the cotter pin (30).
(b) Remove the nut (31), the washer (29) and the bolt (33).
(c) Disconnect the lever (28) from the flap link arm (32).



EFF :
ALL
 27-54-55



AIJ




Page 404
Feb 01/08

Flap Actuator Lever - Track 1


Figure 401/TASK 27-54-55-991-001



EFF :
ALL
 27-54-55



AIJ




Page 405
May 01/10

Flap Actuator Lever - Track 2


Figure 402/TASK 27-54-55-991-004



EFF :
ALL
 27-54-55



AIJ




Page 406
May 01/10

(3) At the track 1 position:


(Ref. Fig. 401/TASK 27-54-55-991-001)
(a) Remove and discard the cotter pin (9).
(b) Remove the nut (8), the washer (7) and the bolt (6).
(c) Disconnect the lever (10) from the flap link arm (5).
NOTE : The stops only limit the carriage movement, they do not
____
prevent flap movement.
(d) Hold the trailing edge of the inboard flap with an adjustable
strut.
(e) Remove the nuts (11) from the bolts (2), (3) and (4).
(f) Remove the bolts (2), (3) and (4) and the cover shell (1).
(g) Disconnect the No. 1 flap track beam from the aircraft structure
at the forward and the rear mountings (Ref. TASK 57-51-33-000001).
NOTE : This will give sufficient access to remove the
____
flap-actuator lever from the beam.
(h) Remove the lever (10) from the No.1 flap track beam.
Subtask 27-54-55-020-058
R

B. Removal of the Flap-Actuator Lever Assembly - Track 2


CAUTION : SUPPORT THE FLAP ALONG THE FULL LENGTH OF THE TRAILING EDGE.
_______
THIS WILL PREVENT DAMAGE TO THE FLAP.
(1) Use the hoisting sling to hold the weight of the inboard flap.
(2) At the track 1 position:
(Ref. Fig. 401/TASK 27-54-55-991-001)
(a) Remove and discard the cotter pin (9).
(b) Remove the nut (8), the washer (7) and the bolt (6).
(c) Disconnect the lever (10) from the flap link arm (5).



EFF :
ALL
 27-54-55



AIJ




Page 407
Feb 01/08

(3) At the track 2 position:


(Ref. Fig. 402/TASK 27-54-55-991-004)
(a) Remove and discard the cotter pin (30).
(b) Remove the nut (31), the washer (29) and the bolt (33).
(c) Disconnect the lever (28) from the flap link arm (32).
(d) Lower the inboard flap on to the stops at tracks 1 and 2.
NOTE : The stops only limit the carriage movement, they do not
____
prevent flap movement.
(e) Hold the trailing edge of the inboard flap with an adjustable
strut.
(f) Remove and discard the cotter pin (38).
(g) Remove the nut (39), the bolt (27) and the retention plate (35).
(h) Remove the nut (44) and the bolt (25).
R

(i) Use the EXTRACTOR-HOUSING,OUTB TR 3 (98D27508698000) to remove


the bearing housing (26).
(j) Move the lever (28) inboard and remove it from the bearing
housing (34).
(k) Turn the lever (28) through 90 deg. and remove it from the
brackets (36) on the rear spar.
(l) Remove and discard the cotter pin (37). Use the SOCKET WRENCH RETAINER NUT, TRACK 1 to remove the ring nut (40).
(m) Use the EXTRACTOR - HOUSING, TRACK 2,3,4 (98D27508697000) to
remove the bearing housing (34).
(n) Remove the nuts (41), the bolts (43) and the anti-rotation plate
(42).



EFF :
ALL
 27-54-55



AIJ




Page 408
Feb 01/11

TASK 27-54-55-400-001
Installation of the Flap-Actuator Lever Assembly - Tracks 1 and 2
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504028000
98D27604000000

non metallic scraper


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 SPANNER-FLAP LEVER TRACKS 2 AND 3
1 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-54-55


R 
AIJ




Page 409
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
Material No. 05-002
Material No. 05-064
Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
GB ABP1-4053
RELEASE AGENT (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

9
9
30
30
37
38

cotter pin
cotter pin
cotter-pin
cotter-pin
cotter-pin
cotter pin

27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05



EFF :
ALL
 27-54-55



AIJ




33U-150A
33V-150
33U-030A
33V-030
27A-010
27A-010

Page 410
May 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-002
27-50-00-000-003
27-50-00-866-008
27-50-00-866-009
27-51-00-820-003
27-54-00-710-001
27-54-49-000-001
27-54-49-000-002
27-54-49-400-001
27-54-49-400-002
27-60-00-866-002
32-12-00-410-001
53-35-11-000-001
57-51-33-400-001
57-51-37-000-002
R
57-51-37-400-002
R
57-55-11-000-001
57-55-11-400-001
27-54-55-991-001
27-54-55-991-004

Removal of the Inboard and Outboard Flap


Hoisting-Sling
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Operational Test of the Flap System
Removal of the Flap Track 1 Actuator 6205CM(6255CM)
Removal of the Flap Track 2 Actuator 6211CM(6261CM)
Installation of the Flap Track 1 Actuator
6205CM(6255CM)
Installation of the Flap Track 2 Actuator
6211CM(6261CM)
Extension-Retraction of the Spoilers for Maintenance
Close the Main Gear Doors after Access
Removal of the Wing-to-Fuselage Fairings
Installation of the No.1 Flap Track Beam
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
Installation of the Flap Track Fairings Nos. 2, 3 and
4
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-54-55-941-070
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the flight controls.



EFF :
ALL
 27-54-55



AIJ




Page 411
Nov 01/09

(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-54-55-860-056
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable zone 573
(673).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control-lever.
(3) Make sure that the applicable MLG door zone 734(744) is open and the
SLEEVE - GROUND LOCK is on the MLG door actuating cylinder.

(4) Make sure that the flaps are extended fully (Ref. TASK 27-50-00-866008).
(5) Make sure that the No. 1 Spoiler has been extended (Ref. TASK 27-6000-866-002).
(6) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(7) Make sure that the applicable access panels have been removed:
- for the left wing, panels 193AB, 193BB
- for the right wing, panels 194AB, 194BB.
(8) Make sure that the applicable actuators for Tracks 1 and 2 have been
removed (Ref. TASK 27-54-49-000-001) or (Ref. TASK 27-54-49-000-002).
(9) Make sure that the No. 2 flap track movable-fairing has been removed
(Ref. TASK 57-55-11-000-001).
(10) Make sure that the access panels 573BB(673BB) are removed (Ref. TASK
57-51-37-000-002).



EFF :
ALL
 27-54-55



AIJ




Page 412
Feb 01/08

Subtask 27-54-55-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-55-420-055
A. Preparation for Installation
(1) Remove the unwanted sealant from all the interface surfaces with a
non metallic scraper and with CLEANING AGENTS (Material No. 11-026).
(2) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Examine the bushes and bearing surfaces for wear and for general
condition.



EFF :
ALL
 27-54-55


R 
AIJ




Page 413
Feb 01/07

Subtask 27-54-55-420-053
R

B. Installation of the Flap-Actuator Lever Assembly - Track 1


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) At the track 1 position:
(Ref. Fig. 401/TASK 27-54-55-991-001)
(a) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces
of the actuator lever (10).
(b) Install the actuator lever (10) into the No.1 flap track beam.
(c) Connect the No.1 flap track beam to the aircraft structure at the
forward and the rear mountings (Ref. TASK 57-51-33-400-001).
(d) Apply a layer of SPECIAL MATERIALS (Material No. 05-002) to the
thread of the nuts (11).
(e) Install the cover shell (1) with the bolts (2), (3) and (4) and
the nuts (11).
(f) TORQUE the bolts (2), (3) and (4) to between 1.4 and 1.6 m.daN
(10.32 and 11.79 lbf.ft).
(g) Remove the adjustable strut.
(h) Connect the lever (10) to the flap link arm (5) as follows:
1
_

Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)


and to the nut (8).

2
_

Install the bolt (6), the washer (7) and the nut (8).



EFF :
ALL
 27-54-55



AIJ




Page 414
Nov 01/08

(2) At the track 2 position:


(Ref. Fig. 402/TASK 27-54-55-991-004)
(a) Connect the lever (28) to the flap link arm (32) as follows:
1
_

Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)


and to the nut (31).

2
_

Install the bolt (33), the washer (29) and the nut (31).

(3) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).


(4) At the track 1 position:
R
R

(a) TORQUE the nut (8) to between 1.2 and 1.8 m.daN (106.19 and
159.29 lbf.in) and safety with a new cotter pin (9).
(5) At the track 2 position:

R
R

(a) TORQUE the nut (31) to between 1.8 and 2.3 m.daN (13.27 and 16.96
lbf.ft) and safety with a new cotter-pin (30).
(6) At tracks 1 and 2:
(a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6)
and (33) and the nuts (8) and (31) after assembly.
(7) Install the Flap Track 1 Actuator 6205CM(6255CM) (Ref. TASK 27-54-49400-001).
Subtask 27-54-55-420-061

C. Installation of the Flap-Actuator Lever Assembly - Track 2


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.



EFF :
ALL
 27-54-55



AIJ




Page 415
Nov 01/08

(1) At the track 2 position:


(Ref. Fig. 402/TASK 27-54-55-991-004)

(a) Apply SEALANTS (Material No. 09-018) to the bolts (43).


(b) Install the bolts (43) in the outboard bracket (36) with the bolt
heads inboard.
(c) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No.
09-019) to the mating face of the anti-rotation plate (42).
(d) Install the anti-rotation plate (42) on the bolts (43) and
loosely install the nuts (41).
(e) Apply SPECIAL MATERIALS (Material No. 05-064) to the holes of the
bearing housings in the brackets (36).
(f) Apply SEALANTS (Material No. 09-018) to the plain shank and
flange of the bearing housing (34).
(g) Install the bearing housing (34) in the outboard bracket (36) and
tighten the nuts (41).
(h) Apply COMMON GREASE (Material No. 04-022) to the ring nut (40).
(i) Install the ring nut (40) on the bearing housing (34).
(j) Torque the ring nut (40) with the SPANNER-FLAP LEVER TRACKS 2 AND
3 (98D27504028000) to between 1.4 and 1.5 m.daN (10.32 and 11.06
lbf.ft).
(k) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin
(37) in an applicable position on the bearing housing (34).
Remove all unwanted material from the area.
(l) Safety the ring nut (40) with a new cotter-pin (37).
(m) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces
of the lever (28).
(n) Turn the lever (28) through 90 deg. and install it in the bearing
housing (34).
(o) Install the bearing housing (26), the bolt (25) and the nut (44).
(p) Apply COMMON GREASE (Material No. 04-022) to the retention plate
(35) and to the bolt (27).



EFF :
ALL
 27-54-55



AIJ




Page 416
Feb 01/07

(q) Install the retention plate (35), the bolt (27) and the nut (39).
(r) TORQUE the nut (39) to between 1.4 and 1.5 m.daN (10.32 and 11.06
lbf.ft).
(s) Manually operate the lever (28) and make sure that it moves
freely.
(t) Safety the nut (39) with the new cotter pin (38).
(u) Remove the adjustable strut.
(2) At the track 1 position:
(Ref. Fig. 401/TASK 27-54-55-991-001)
(a) Connect the lever (10) to the flap link arm (5) as follows:
1
_

Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)


and the nut (8).

(b) Install the bolt (6), the washer (7) and the nut (8).
(3) At the track 2 position:
(a) Connect the lever (28) to the flap link arm (32) as follows:
1
_

Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)


and to the nut (31).

2
_

Install the bolt (33), the washer (29) and the nut (31).

(4) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).


(5) At the track 1 position:
R
R

(a) TORQUE the nut (8) to between 1.2 and 1.8 m.daN (106.19 and
159.29 lbf.in) and safety with a new cotter pin (9).
(6) At the track 2 position:

R
R

(a) TORQUE the nut (31) to between 1.8 and 2.3 m.daN (13.27 and 16.96
lbf.ft) and safety with a new cotter-pin (30).
(7) At tracks 1 and 2:
(a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6)
and (33) and the nuts (8) and (31) after assembly.



EFF :
ALL
 27-54-55



AIJ




Page 417
Nov 01/08

(8) Install the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-54-49400-002).
R

(9) Remove the locking tools LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the
torque shaft outboard of the track 2 actuator (Ref. TASK 27-50-00000-003).
(10) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).
Subtask 27-54-55-865-054
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-55-710-050
E. Test
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control-lever.
(2) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
(3) Visually examine the inboard flap for correct operation during the
retraction and extension of the flaps.
5. Close-up
________
Subtask 27-54-55-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels (Ref. TASK 53-35-11-000-001):
- for the left wing, panel 193AB, 193BB
- for the right wing, panel 194AB, 194BB.
(3) Close the applicable MLG door (Ref. TASK 32-12-00-410-001).
(4) Install the applicable access panel 573BB or 673BB (Ref. TASK 57-5137-400-002).



EFF :
ALL
 27-54-55



AIJ




Page 418
Feb 01/08

Subtask 27-54-55-860-057
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
(2) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(3) Fully retract the No. 1 Spoiler (Ref. TASK 27-60-00-866-002).
(a) On the servo-control, make sure that the pointer on the hex. head
is opposite the letter O (Operation) on the housing.
(4) Install the No. 2 Flap-Track movable fairing (Ref. TASK 57-55-11-400001).
Subtask 27-54-55-942-052
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-55


R 
AIJ




Page 419
Feb 01/07

TASK 27-54-55-000-002
Removal of the Flap-Actuator Lever Assembly - Track 3
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R
R

No specific
No specific
No specific
No specific
No specific
No specific
98D27504028000
98D27504030001
98D27508697000
98D27508698000

1
1
1
1
1
2
1
1

circuit breaker(s) safety clip(s)


safety barriers
ACCESS PLATFORM 2M (6 FT)
STRUT - ADJUSTABLE
SUPPORT STRUCTURE - FLAP
WARNING NOTICE(S)
SPANNER-FLAP LEVER TRACKS 2 AND 3
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
EXTRACTOR - HOUSING, TRACK 2,3,4
EXTRACTOR-HOUSING,OUTB TR 3



EFF :
ALL
 27-54-55



AIJ




Page 420
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-50-00-866-008
27-54-49-000-003
27-60-00-866-002
57-51-37-000-004
57-55-11-000-001
27-54-55-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
Fig. 403

R
3. __________
Job Set-up
Subtask 27-54-55-941-068
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the flight controls.
Subtask 27-54-55-860-054
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).

(2) Extend the flaps fully (Ref. TASK 27-50-00-866-008).



EFF :
ALL
 27-54-55



AIJ




Page 421
Feb 01/11

(3) Fully extend the No. 2, No. 3, No. 4 and No. 5 Spoilers (Ref. TASK
27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(5) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever.
Subtask 27-54-55-865-051
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-55-862-051
D. De-energize the aircraft electrical circuits
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-54-55-010-060
E. Get Access
R
R

(1) Put the ACCESS PLATFORM 2M (6 FT) in position below the applicable
zone 575 or 675.
(2) Remove the applicable access panels 575BB, 575FB or 675BB, 675FB
(Ref. TASK 57-51-37-000-004).

R
R

(3) Remove the No. 3 Flap Track movable fairing, but do not retract the
flaps or remove the fixed fairing (Ref. TASK 57-55-11-000-001).
Subtask 27-54-55-480-051
F. Installation of Support Equipment

(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) on the torque shafts
each side of the Track 3 actuator (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-54-55



AIJ




Page 422
Feb 01/11

Subtask 27-54-55-010-054
G. Get Access
(1) Remove the Track 3 actuator 6221CM(6271CM) (Ref. TASK 27-54-49-000003).
4. Procedure
_________
R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-55-020-056
A. Removal of the Flap-Actuator Lever Assembly - Track 3
(Ref. Fig. 403/TASK 27-54-55-991-002)

R
R

(1) Put a SUPPORT STRUCTURE - FLAP along the span of the outboard flap to
prevent movement.

R
R
R

(2) Remove and discard the cotter pins (6).

R
R

(3) Remove the nuts (7), the washers (8) and the bolts (10) and
disconnect the link-arms (9) from the levers (5).

(4) Lower the outboard flap on to the stops.


NOTE : The stops only limit the carriage movement. They do not
____
prevent flap movement.

R
R

(5) Hold the trailing-edge of the outboard flap with an STRUT ADJUSTABLE.
NOTE : The flap can be damaged if it is not supported along all of
____
the span.



EFF :
ALL
 27-54-55



AIJ




Page 423
Feb 01/11

Flap Actuator Lever - Track 3


Figure 403/TASK 27-54-55-991-002



EFF :
ALL
 27-54-55



AIJ




Page 424
May 01/10

R
R

(6) Remove and discard the cotter pin (17).

R
R

(7) Remove the nut (16), the bolt (4) and the retention plate (13).

R
R

(8) Remove the nut (1) and the bolt (2).

R
R
R

(9) Use the EXTRACTOR-HOUSING,OUTB TR 3 to remove the bearing housing


(3).

R
R
R

(10) Move the lever (5) inboard and remove it from the outboard bearing
housing (12).

R
R
R

(11) Turn the lever (5) through 90 deg. and remove it from the brackets
(14) on the rear spar.

R
R
R

(12) Remove and discard the cotter pin (15). Use the SPANNER-FLAP LEVER
TRACKS 2 AND 3 to remove the ring nut (18). Remove the washer (19).

R
R

(13) Remove and discard the cotter pins (21).

R
R

(14) Remove the nuts (20) and the bolts (11).

R
R

(15) Use the EXTRACTOR - HOUSING, TRACK 2,3,4 to remove the bearing
housing (12).



EFF :
ALL
 27-54-55



AIJ




Page 425
Feb 01/11

TASK 27-54-55-400-002
Installation of the Flap-Actuator Lever Assembly - Track 3
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

1 SAFETY BARRIER(S)
1 SPATULA - NON METALLIC
1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

R
98D27504028000
98D27604000000

1 SPANNER-FLAP LEVER TRACKS 2 AND 3


1 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-54-55



AIJ




Page 426
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 04-022

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 05-064
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
GB ABP1-4053
RELEASE AGENT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6
15
17
21

cotter-pins
cotter-pin
cotter pin
cotter-pins

27-54-05
27-54-05
27-54-05
27-54-05



EFF :
ALL
 27-54-55



AIJ




35H-060
28A-010
28A-010
28A-135

Page 427
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-51-00-820-003
27-54-00-710-001
27-54-49-000-003
27-54-49-400-003
27-60-00-866-002
57-51-37-000-004
57-51-37-400-004
57-55-11-000-001
57-55-11-400-001
27-54-55-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Operational Test of the Flap System
Removal of the Flap Track 3 Actuator 6221CM(6271CM)
Installation of the Flap Track 3 Actuator
6221CM(6271CM)
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
Installation of the Flap Track Fairings Nos. 2, 3 and
4
Fig. 403

R
3. __________
Job Set-up
Subtask 27-54-55-941-071
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in the cockpit to tell
persons not to operate the flight controls.



EFF :
ALL
 27-54-55



AIJ




Page 428
Feb 01/11

Subtask 27-54-55-860-058
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control-lever.
(3) Make sure that the Nos 2, 3, 4 and 5 spoilers are fully extended
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(5) Make sure that the access platform is below the applicable zone 575
or 675.
(6) Make sure that the access panels have been removed (Ref. TASK 57-5137-000-004):
- for the left wing, 575BB and 575FB
- for the right wing, 675BB and 675FB.
R
R
R

(7) Make sure that the No. 3 Flap Track movable fairings has been removed
(Ref. TASK 57-55-11-000-001).
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the torque shafts each side of the Track 3 actuator (Ref. TASK 2750-00-400-003).
(9) Make sure that the Track 3 actuator has been removed (Ref. TASK 2754-49-000-003).
Subtask 27-54-55-865-055
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-55



AIJ




Page 429
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-54-55-991-002)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-55-420-056
A. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

(1) Remove the unwanted sealant from all the interface surfaces with a
SPATULA - NON METALLIC and with CLEANING AGENTS (Material No. 11026).
(2) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Examine the bushes and bearing surfaces for wear and for general
condition.
Subtask 27-54-55-914-054
B. Application of Special Materials
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.



EFF :
ALL
 27-54-55



AIJ




Page 430
Feb 01/11

(1) Apply SPECIAL MATERIALS (Material No. 05-064) to the holes of the
bearing housings in the brackets (14).
R
R
R

(2) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the plain shank and flange of the bearing housing (12) and
to the bolts (11).
Subtask 27-54-55-420-057-A

R
R

C. Installation of the Flap-Actuator Lever Assembly


(Ref. Fig. 403/TASK 27-54-55-991-002)

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R

(1) Install the bearing housing (12) in the bracket (14) and install the
bolts (11) with the heads inboard.

R
R
R

(2) Install the washer (19) and the ring nut (18) and tighten the ring
nut (18) to pull the bearing housing (12) into position. Remove the
ring nut (18) and the washer (19).

(3) Install the nuts (20) and safety with new cotter-pins (21).

R
R

(4) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the mating face of the washer (19).

(5) Install the washer (19) on the bearing housing (12).

(6) Apply COMMON GREASE (Material No. 04-022) to the ring nut (18).

(7) Install the ring nut (18) on the bearing housing (12).

R
R

(8) TORQUE the ring nut (18) with the SPANNER-FLAP LEVER TRACKS 2 AND 3
to between 1.4 and 1.5 m.daN (10.32 and 11.06 lbf.ft).

R
R
R

(9) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin (15)
in an applicable position on the bearing housing (12). Remove all
unwanted material from the area.

(10) Safety the ring nut (18) with a new cotter-pin (15).

R
R

(11) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of
the lever (5).



EFF :
ALL
 27-54-55



AIJ




Page 431
Feb 01/11

R
R

(12) Turn the lever (5) through 90 deg. and install it in the bearing
housing (12).

R
R
R

(13) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the mating surface of the bearing housing (3) and on the
bolt (2).

(14) Install the bearing housing (3), the bolt (2) and the nut (1).

R
R

(15) Apply COMMON GREASE (Material No. 04-022) to the retention plate (13)
and to the bolt (4).

(16) Install the retention plate (13), the bolt (4) and the nut (16).

R
R

(17) TORQUE the nut (16) to between 1.4 and 1.5 m.daN (10.32 and 11.06
lbf.ft)

(18) Manually operate the lever (5) and make sure that it moves freely.

(19) Safety the nut (16) with the new cotter pin (17).

(20) Remove the adjustable strut.

(21) Move the flap to align the flap link arms (9) to the levers (5).

R
R

(22) Apply COMMON GREASE (Material No. 04-004) or COMMON GREASE (Material
No. 04-024) to the bolts (10) and the nuts (7).

(23) Install the bolts (10), the washers (8) and the nuts (7).

R
R

(24) TORQUE the nuts (7) to between 1.8 and 2.2 m.daN (13.27 and 16.22
lbf.ft) and safety with new cotter-pins (6).

(25) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).

R
R

(26) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (10)
and the nuts (7) after assembly.

R
R

(27) Install the Track 3 actuator 6221CM(6271CM) (Ref. TASK 27-54-49-400003)



EFF :
ALL
 27-54-55



AIJ




Page 432
Feb 01/11

Subtask 27-54-55-080-051
D. Removal of Support Equipment
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shafts
each side of the Track 3 actuator (Ref. TASK 27-50-00-000-003).
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control-lever.
Subtask 27-54-55-865-056
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-55-710-051
F. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
(2) Visually examine the outboard flap for correct operation during the
retraction and extension of the flaps.
5. Close-up
________
Subtask 27-54-55-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels 575BB, 575FB or 675BB, 675FB
(Ref. TASK 57-51-37-400-004).



EFF :
ALL
 27-54-55



AIJ




Page 433
Feb 01/11

Subtask 27-54-55-866-056
B. Aircraft Maintenance Configuration
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Retract the No. 2 and the No. 3 Spoilers fully (Ref. TASK 27-60-00866-002).
Subtask 27-54-55-410-058
C. Close Access
R

(1) Install the No. 3 Flap-Track movable fairing (Ref. TASK 57-55-11-400001).
Subtask 27-54-55-942-054
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-55



AIJ




Page 434
Feb 01/11

TASK 27-54-55-000-003
Removal of the Flap-Actuator Lever Assembly - Track 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R
R

No specific
No specific
No specific
No specific
No specific
No specific
98D27504029000
98D27504030001
98D27508697000
98D27508698000

1
1
1
1
1
1
1
1

circuit breaker(s) safety clip(s)


safety barriers
ACCESS PLATFORM 2M (6 FT)
STRUT - ADJUSTABLE
SUPPORT STRUCTURE - FLAP
WARNING NOTICE(S)
SPANNER - SOCKET (FLAP LEVER TRACK 4)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
EXTRACTOR - HOUSING, TRACK 2,3,4
EXTRACTOR-HOUSING,OUTB TR 3



EFF :
ALL
 27-54-55



AIJ




Page 435
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002

27-50-00-866-008
27-54-49-000-004
27-60-00-866-002
57-55-11-000-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
Extension-Retraction of the Spoilers for Maintenance
Removal of the Flap Track Fairings Nos. 2, 3 and 4

27-54-55-991-003

Fig. 404

24-41-00-862-002
27-50-00-400-003

R
3. __________
Job Set-up
Subtask 27-54-55-941-069
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the flight controls.
Subtask 27-54-55-860-055
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(3) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed
on the flap/slat control lever.



EFF :
ALL
 27-54-55



AIJ




Page 436
Feb 01/11

(4) Fully extend the No. 2, No. 3, No. 4 and the No. 5 Spoilers
(Ref. TASK 27-60-00-866-002).
(5) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-54-55-865-052
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-55-862-052
D. De-energize the Electrical Circuits
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 27-54-55-941-058
E. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) in position below the applicable
zone 575 or 675.
(2) Remove the applicable access panels 575BB, 575FB or 675BB, 675FB.

R
R

(3) Remove the No. 4 Flap-Track movable fairing, but do not retract the
flaps or remove the fixed fairings (Ref. TASK 57-55-11-000-001).
(4) Remove the Track 4 actuator 6233CM(6283CM) (Ref. TASK 27-54-49-000004).

(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) on the torque shaft
adjacent to the Track 4 actuator (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-54-55



AIJ




Page 437
Feb 01/11

4. Procedure
_________
R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-55-020-057
A. Removal of the Flap-Actuator Lever Assembly - Track 4
(Ref. Fig. 404/TASK 27-54-55-991-003)

R
R

(1) Put a SUPPORT STRUCTURE - FLAP along the span of the outboard flap to
prevent movement.

R
R
R

(2) Remove and discard the cotter pins (6).

R
R
R

(3) Remove the nuts (7), the washers (8) and the bolts (10) and
disconnect the levers (5) from the flap link-arms (9).

(4) Lower the outboard flap on to the stops.


NOTE : The stops only limit the carriage movement. They do not
____
prevent flap movement.

R
R

(5) Hold the trailing edge of the outboard flap with an STRUT ADJUSTABLE.
NOTE : The flap can be damaged if it is not supported along all the
____
span.

(6) At track 4:
(a) Remove and discard the cotter pin (19).
(b) Remove the nut (18), the bolt (4), the washer(s) (13) and/or (14)
and the spacer (12).
(c) Remove the nut (22) and the bolt (2).



EFF :
ALL
 27-54-55



AIJ




Page 438
Feb 01/11

Flap Actuator Lever - Track 4


Figure 404/TASK 27-54-55-991-003


EFF :
ALL
 27-54-55


R 
AIJ




Page 439
Feb 01/11

(d) Use the EXTRACTOR-HOUSING,OUTB TR 3 to remove the bearing housing


(3).
(e) Move the lever (5) inboard and remove it from the bearing housing
(11).
(f) Turn the lever (5) through 90 deg. and remove it from the
brackets (15) on the rear spar.
(g) Remove and discard the cotter pin (17). Use the SPANNER - SOCKET
(FLAP LEVER TRACK 4) to remove the ring nut (20).

(h) Use the EXTRACTOR - HOUSING, TRACK 2,3,4 to remove the bearing
housing (11).
(i) Remove the nuts (21), the bolts (1) and the anti-rotation plate
(16).



EFF :
ALL
 27-54-55



AIJ




Page 440
Feb 01/11

TASK 27-54-55-400-003
Installation of the Flap-Actuator Lever Assembly - Track 4
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

1 SAFETY BARRIER(S)
1 SPATULA - NON METALLIC
1 WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

R
98D27504029000

1 SPANNER - SOCKET (FLAP LEVER TRACK 4)



EFF :
ALL
 27-54-55



AIJ




Page 441
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
Material No. 05-002
Material No. 05-064
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
GB ABP1-4053
RELEASE AGENT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

6
6
6
6
6
6
6
6
6
17
19

cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pins
cotter-pin
cotter pin

27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05
27-54-05



EFF :
ALL
 27-54-55



AIJ




35H-010
35H-010A
35H-010B
35H-010C
35H-010D
35H-010E
35H-010F
35H-010G
35H-010J
29A-010
29A-040

Page 442
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-50-00-866-008
27-50-00-866-009
27-51-00-820-003
27-54-00-710-001
27-54-49-000-004
27-54-49-400-004
27-60-00-866-002
57-55-11-000-001
57-55-11-400-001

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Operational Test of the Flap System
Removal of the Flap Track 4 Actuator 6233CM(6283CM)
Installation of the Flap Track 4 Actuator
6233CM(6283CM)
Extension-Retraction of the Spoilers for Maintenance
Removal of the Flap Track Fairings Nos. 2, 3 and 4
Installation of the Flap Track Fairings Nos. 2, 3 and
4

R
27-54-55-991-003

Fig. 404

3. __________
Job Set-up
Subtask 27-54-55-941-072
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) are in the cockpit to tell
persons not to operate the flight controls.
Subtask 27-54-55-860-060
B. Aircraft Maintenance Configuration

(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the Nos. 2, 3, 4 and 5 spoilers are fully extended
(Ref. TASK 27-60-00-866-002).



EFF :
ALL
 27-54-55



AIJ




Page 443
Feb 01/11

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(4) Make sure that the access platform is below the applicable zone 575
or 675.
(5) Make sure that the applicable access panels have been removed
575BB(675BB), 575FB(675FB).
R
R
R

(6) Make sure that No. 4 Flap-Track movable fairings has been removed
(Ref. TASK 57-55-11-000-001).
(7) Make sure that the Track 4 actuator has been removed (Ref. TASK 2754-49-000-004).
(8) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control-lever.
(9) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is on the
torque shaft adjacent to the Track 4 actuator (Ref. TASK 27-50-00400-003).
Subtask 27-54-55-865-057
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 404/TASK 27-54-55-991-003)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-55



AIJ




Page 444
Feb 01/11

Subtask 27-54-55-420-058
A. Preparation for Installation
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R

(1) Remove the unwanted sealant from all surfaces with a SPATULA - NON
METALLIC with CLEANING AGENTS (Material No. 11-026).
(2) Clean the component interfaces and or the adjacent areas with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Examine the bushes and bearing surfaces for wear and for general
condition.
Subtask 27-54-55-914-057
B. Application of Special Materials
(Ref. Fig. 404/TASK 27-54-55-991-003)

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R

(1) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the bolts (1).

Subtask 27-54-55-420-059-A

R
R

C. Installation of the Flap-Actuator Lever Assembly - Track 4


(Ref. Fig. 404/TASK 27-54-55-991-003)

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R

(1) Install the bolts (1) in the outboard bracket (15) with the bolt
heads inboard.

R
R

(2) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the mating face of the anti-rotation plate (16).



EFF :
ALL
 27-54-55



AIJ




Page 445
Feb 01/11

R
R

(3) Install the anti-rotation plate (16) on the bolts (1) and loosely
install the nuts (21).

R
R

(4) Apply SPECIAL MATERIALS (Material No. 05-064) to the holes of the
bearing housings in the brackets (15).

R
R

(5) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the plain shank and flange of the bearing housing (11).

R
R

(6) Install the bearing housing (11) in the outboard bracket (15) and
tighten the nuts (21).

(7) Apply COMMON GREASE (Material No. 04-022) to the ring nut (20).

(8) Install the ring nut (20) on the bearing housing (11).

R
R

(9) TORQUE the ring nut (20) with the SPANNER - SOCKET (FLAP LEVER TRACK
4) to between 1.4 and 1.5 m.daN (10.32 and 11.06 lbf.ft).

R
R
R

(10) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin (17)
in an applicable position on the bearing housing (11). Remove all
unwanted material from the work area.

(11) Safety the ring nut (20) with a new cotter-pin (17).

R
R

(12) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of
the lever (5).

R
R

(13) Turn the lever (5) through 90 deg. and install it in the bearing
housing (11).

R
R
R

(14) Apply SEALANTS (Material No. 09-018B) or SEALANTS (Material No. 09019B) to the mating face of the bearing housing (3) and to the bolt
(2).

(15) Install the bearing housing (3), the bolt (2) and the nut (22).

R
R

(16) Apply COMMON GREASE (Material No. 04-022) to the spacer (12) and the
bolt (4).

R
R

(17) Install the spacer (12), the bolt (4), the washer(s) (13) and/or (14)
and the nut (18).

R
R
R
R

NOTE : For cotter pin hole alignment, and the correct locking of the
____
nut (18) at the specified torque:
- install one or two of the washers (13) or (14), or one
washer (13) and one washer (14).



EFF :
ALL
 27-54-55



AIJ




Page 446
Feb 01/11

R
R

(18) TORQUE the nut (18) to between 1.4 and 1.5 m.daN (10.32 and 11.06
lbf.ft).

R
R

(19) If the cotter pin hole does not align with the nut (18), continue as
follows:

(a) Remove the nut (18) and the washers (13) and/or (14).

R
R

(b) Repeat work step (17) with a different configuration of washers


(13) and/or (14).

(c) Repeat work step (18).

(20) Manually operate the lever (5) and make sure that it moves freely.

(21) Safety the nut (18) with a new cotter pin (19).

(22) Remove the adjustable strut.

(23) Move the flap to align the flap link-arms (9) to the levers (5).

R
R

(24) Apply SPECIAL MATERIALS (Material No. 05-002) to the bolts (10) and
the nuts (7).

(25) Install the bolts (10), the washers (8) and the nuts (7).

R
R

(26) TORQUE the nuts (7) to between 1.8 and 2.2 m.daN (13.27 and 16.22
lbf.ft) and safety with new cotter-pins (6).

(27) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).

R
R

(28) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (10)
and the nuts (7) after assembly.

R
R

(29) Install the Track 4 actuator 6233CM(6283CM) (Ref. TASK 27-54-49-400004).



EFF :
ALL
 27-54-55



AIJ




Page 447
Feb 01/11

Subtask 27-54-55-865-058
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2

6CV
8CV

B07
Q21

Subtask 27-54-55-080-052
E. Removal of Support Equipment
(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft
adjacent the track 4 actuator (Ref. TASK 27-50-00-000-003).
Subtask 27-54-55-710-052
F. Test
(1) Do an operational test of the flaps (Ref. TASK 27-54-00-710-001).
(2) Visually examine the outboard flap for correct operation during
retraction and extension of the flaps.
5. Close-up
________
Subtask 27-54-55-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels 575BB, 575FB or 675BB, 675FB.



EFF :
ALL
 27-54-55



AIJ




Page 448
Feb 01/11

Subtask 27-54-55-860-059
B. Aircraft Maintenance Configuration
R

(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).


(2) Fully retract the No. 4 and the No. 5 Spoilers (Ref. TASK 27-60-00866-002).

(3) Install the No. 4 Flap-Track movable fairing (Ref. TASK 57-55-11-400001).
Subtask 27-54-55-942-056
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-55



AIJ




Page 449
Feb 01/11

INBOARD FLAP - REMOVAL/INSTALLATION


___________________________________
TASK 27-54-61-000-001
Removal of the Inboard Flap
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

blanking caps

R
R

No specific
No specific
No specific
No specific
No specific
No specific
98D27504035000
98D27504084000
98D27803500001

AR
AR
AR
AR
AR
1
1
1

safety barriers
ACCESS PLATFORM 3M (10 FT)
COVER - PROTECTION
SUPPORT STRUCTURE - FLAP
TAPE - ADHESIVE
WARNING NOTICE(S)
ADAPTER-TORQUE-TRUNNION NUT
EXTRACTOR - PIN, TRACK 4
TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-61



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-002
27-50-00-400-002
27-50-00-400-003
27-50-00-866-009
27-50-00-866-011
27-54-61-000-002
27-60-00-866-002
53-35-11-000-001
54-55-00-000-001
57-55-11-010-001

CMM 575221
CMM 575223
27-54-61-991-001
27-54-61-991-012
27-54-61-991-005
27-54-61-991-006
27-54-61-991-013
27-54-61-991-007
27-54-61-991-049-A

Removal of the Inboard and Outboard Flap


Hoisting-Sling
Installation of the Inboard and Outboard Flap
Hoisting-Sling
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retraction of the Flaps on the Ground
Manual Extension of the Flaps
Removal of the Flap Kink-Seals and Cushion-Seals
Extension-Retraction of the Spoilers for Maintenance
Removal of the Wing-to-Fuselage Fairings
Removal of the Aft Movable Fairing
To Lower the Flap Track No. 2 Movable Fairing for
Access
(for corrective action)
(for corrective action)
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407

3. __________
Job Set-up
Subtask 27-54-61-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a WARNING NOTICE(S) on panel 400VU to tell persons not to operate
the landing gear.
(3) Put a WARNING NOTICE(S) in position to tell persons not to operate
the flight controls.



EFF :
ALL
 27-54-61



AIJ




Page 402
May 01/11

Subtask 27-54-61-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are retracted fully (Ref. TASK 27-50-00-866009).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever.
Subtask 27-54-61-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-61-010-051
D. Get Access
(Ref. Fig. 401/TASK 27-54-61-991-001)
(1) Put the ACCESS PLATFORM 3M (10 FT) in position below the applicable
inboard flap.
(2) Lower the flap track No. 2 movable fairing for access (Ref. TASK 5755-11-010-001).
(3) Remove the pylon aft movable fairing (Ref. TASK 54-55-00-000-001).
(4) Manually extend the flaps (Ref. TASK 27-50-00-866-011) to get access
to the fasteners of the rubbing strip (2).
R
R

(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) on the shaft 6220CM
(6270CM) (Ref. TASK 27-50-00-400-003).
(6) Remove the support (1) and the rubbing strip (2).
(7) Remove the fairing panels 193AB(194AB) and 193BB(194BB) (Ref. TASK
53-35-11-000-001).



EFF :
ALL
 27-54-61



AIJ




Page 403
Aug 01/11

R
R

Details of the Wing to Fuselage Panels


Figure 401/TASK 27-54-61-991-001



EFF :
ALL
 27-54-61



AIJ




Page 404
Feb 01/07

(8) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the applicable
torque shaft.
(9) Manually extend the flaps to position 1 (Ref. TASK 27-50-00-866-011).
(10) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is on the applicable
torque shaft.
(11) Remove the flap kink seals (Ref. TASK 27-54-61-000-002).
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-61-020-058
A. Disconnect the Interconnecting Strut
(Ref. Fig. 402/TASK 27-54-61-991-012)
(1) Remove the electrical connectors (18) and (20) from the connectors
(17) and (19).
(2) Remove the electrical connectors (21) and (22).
R

(3) Put blanking caps on the disconnected electrical connector(s).


(4) Remove and discard the cotter pin (16) from the nut (15).
(5) Remove the nut (15) and the washer (14).
(6) Remove the bolt (11), the washer (12) and the bush (13).
(7) Hold the interconnecting strut (10) with TAPE - ADHESIVE to the
outboard flap.



EFF :
ALL
 27-54-61



AIJ




Page 405
May 01/10

R
R

Interconnecting Strut - Location and Detail


Figure 402/TASK 27-54-61-991-012- 12 (SHEET 1)



EFF :
ALL
 27-54-61



AIJ




Page 406
Nov 01/08

R
R

Interconnecting Strut - Location and Detail


Figure 402/TASK 27-54-61-991-012- 22 (SHEET 2)



EFF :
ALL
 27-54-61



AIJ




Page 407
Nov 01/08

Subtask 27-54-61-020-059
B. Preparation for Removal of the Inboard Flap
WARNING : THE INBOARD FLAP WEIGHS 114kgs (251lbs).
_______
CAUTION : OPERATE THE HOIST SLOWLY, WHEN YOU PUT THE SLING IN TENSION. DO
_______
NOT TRY TO REMOVE THE FLAP BECAUSE THIS WILL CAUSE DAMAGE.
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the applicable
torque shaft.
(2) Manually extend the flaps to position 3 (Ref. TASK 27-50-00-866-011).
R
R

(3) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) on the shaft 6220CM
(6270CM) (Ref. TASK 27-50-00-400-003).
(4) Remove the FWD rubbing pad from the fixed shroud adjacent to the
outboard cruise roller of the inboard flap.
(5) Manually extend and lock the spoilers 1 and 2 (Ref. TASK 27-60-00866-002).
(6) Install the hoisting sling (Ref. TASK 27-50-00-400-002).
(a) Carefully lift the sling with the hoist until the hoist holds the
weight of the flap.
(7) Disconnect the inner flap from the rotary actuator drive-levers as
follows:
(Ref. Fig. 403/TASK 27-54-61-991-005)
(a) Remove the nut (70), the bolt (72) and disconnect the bonding
strap (71).
(8) Remove the nut (73), the bolt (75) and disconnect the bonding strap
(74).
(9) Hold the trailing edge of the flap by hand and disconnect the rotary
actuator drive-lever at track 1 as follows:
(a) Remove and discard the cotter pin (77).
(b) Remove the nut (76) and washer (78).
(c) Remove the bolt (79).



EFF :
ALL
 27-54-61



AIJ




Page 408
Aug 01/11

(10) Hold the trailing edge of the flap by hand and disconnect the rotary
actuator drive-lever at track 2 as follows:
(a) Remove and discard the cotter pin (83).
(b) Remove the nut (82) and the washer (81).
(c) Remove the bolt (80).
(11) Hold the trailing edge and manually extend the inboard flap until the
flap carriages rest on the end stops.
(12) Hold the flap on supports at an angle of 20 degrees.
Subtask 27-54-61-020-050
C. Removal of the Inboard Flap
(Ref. Fig. 404/TASK 27-54-61-991-006)
(1) Disconnect the inboard flap from the track 2 flap track carriage:
(a) Loosen the nuts (184) sufficiently to let the failsafe hook
assembly (185) move.
(b) Remove the nut (183), the bolt (182) and disconnect the bonding
strap from the bracket on the inboard flap.
(c) Remove and discard the cotter pin (175).
(d) Remove the nut (174).
(e) Remove and discard the crushable spacer (176).
R

(f) Install the EXTRACTOR - PIN, TRACK 4 onto the carriage bolt
(181).
(Ref. Fig. 405/TASK 27-54-61-991-013)
NOTE : Make sure that you screw the extractor pin fully onto the
____
threads. This will hold the locking ring in position and
let it be compressed by the bushes and bearing. The
extractor pin does not cover the locking ring.



R
EFF :
ALL
 27-54-61



AIJ




Page 409
May 01/11

Flap to Rotary Actuator Drive-Lever Connection


Figure 403/TASK 27-54-61-991-005- 12 (SHEET 1)



EFF :
ALL
 27-54-61



AIJ




Page 410
May 01/10

Flap to Rotary Actuator Drive-Lever Connection


Figure 403/TASK 27-54-61-991-005- 22 (SHEET 2)



EFF :
ALL
 27-54-61



AIJ




Page 411
May 01/10

Flap to Flap Carriage Connection (Track 2)


Figure 404/TASK 27-54-61-991-006


EFF :
ALL
 27-54-61


R 
AIJ




Page 412
May 01/11

Flap Installation Tool


Figure 405/TASK 27-54-61-991-013


EFF :
ALL
 27-54-61


R 
AIJ




Page 413
May 01/11

(g) Removal of the carriage bolt:


CAUTION : THE FLAP TO CARRIAGE BOLT ASSEMBLY HAS AN INNER AND AN
_______
OUTER BOLT WHICH MAKE ONE PART.
DO NOT APPLY AN END OR A TORSION FORCE TO THE INNER
BOLT BECAUSE THIS WILL CAUSE DAMAGE TO THE ASSEMBLY.
APPLY FORCE TO THE OUTER BOLT ONLY WHEN YOU
REMOVE/INSTALL THE BOLT ASSEMBLY.
1
_

Remove the carriage bolt (181) using the EXTRACTOR - PIN,


TRACK 4 to push the carriage bolt (181) through the bushes and
bearing.
NOTE : If necessary, carefully lift the flap with the hoist
____
and sling sufficiently to release the weight off the
bolts (181).

(h) Remove the nut (177) and the washer (178).


(i) Remove the locking plate (179) and the splined bush (180).
Subtask 27-54-61-020-051
D. Continue with the Removal Procedure
(Ref. Fig. 406/TASK 27-54-61-991-007, 407/TASK 27-54-61-991-049-A)

(1) Disconnect the inboard flap from the flap track carriage at the track
1 position:
(a) Remove these items:
- the bolt (111)
- the tabwasher (112)
- the retainer (113)
- the screw (121)
- the locknut (110) using the ADAPTER-TORQUE-TRUNNION NUT
- the lockwasher (109)
- the toothplate (108)
- the washer (120).

R
R
R
R

(b) Remove the eccentric bush (107). If necessary, carefully lift the
flap with the hoist and the sling to release the weight from the
eccentric bush (107).
(c) Discard the tabwasher (112) and the lockwasher (109).



EFF :
ALL
 27-54-61



AIJ




Page 414
May 01/11

Flap to Flap Carriage Connection (Track 1)


Figure 406/TASK 27-54-61-991-007


EFF :
ALL
 27-54-61


R 
AIJ




Page 415
May 01/11

R
R

Flap Drive Trunnion - Detail


Figure 407/TASK 27-54-61-991-049-A



EFF :
ALL
 27-54-61



AIJ




Page 416
May 01/11

(2) Remove the flap from the wing:


CAUTION : MAKE SURE THAT THE SUPPORT STRUCTURE IS CLEAN AND DOES NOT
_______
HAVE ANY SHARP POINTS.
CAUTION : MAKE SURE THAT THE FLAP DOES NOT HIT THE AIRCRAFT
_______
STRUCTURE.
(a) Lift the flap with the hoist until it is clear of the flap track
carriage at the track 2 position.
(b) Move the outboard end of the flap, aft, until it is clear of the
wing.
(c) Pull the flap outboard until the flap drive trunnion is clear of
the flap track carriage of the track 1 position.
(d) Move the flap with the hoist to a SUPPORT STRUCTURE - FLAP and
lower it onto the support.
R
R

(3) Put COVER - PROTECTION , where necessary, over the disconnected items
of the flap.
(4) Examine the flap drive trunnion for wear.
(5) If you find damage:
(a) Refer to the CMM (Ref. CMM 575221) or (Ref. CMM 575223) for the
correct repair procedure.
(b) If it is necessary to replace the flap drive trunnion do the step
that follows:
- replace the flap drive trunnion (Ref. CMM 575221) or (Ref. CMM
575223).
Subtask 27-54-61-080-050
E. Removal of Equipment
(1) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).



EFF :
ALL
 27-54-61



AIJ




Page 417
May 01/11

TASK 27-54-61-400-001
Installation of the Inboard Flap
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

No specific

1
AR
AR
AR
1

ACCESS PLATFORM 3M (10 FT)


SAFETY BARRIER(S)
TAPE - ADHESIVE
WARNING NOTICE(S)
WRENCH - PNEUMATIC
Torque Wrench : range 0.00 to 1.20
(0.00 to
Torque Wrench : range 0.20 to 3.60
(2.00 to

m.daN
9.00 lbf.ft)
m.daN
26.00 lbf.ft)



EFF :
ALL
 27-54-61



AIJ




Page 418
May 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
R

98D27504035000
98D27504084000
98D27803500001

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
1 ADAPTER-TORQUE-TRUNNION NUT
1 EXTRACTOR - PIN, TRACK 4
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
R
R

Material No. 08-004A


Material No. 11-026
Material No. 15-007
Material No. 19-003

R
R
R

Material No. 19-010

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-A-46106
TYPE I
ADHESIVE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)



EFF :
ALL
 27-54-61



AIJ




Page 419
May 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

R
R

77
77
83
83
109
112
175
176

cotter pin
cotter pin
cotter pin
cotter pin
lockwasher
tabwasher
cotter pin
crushable spacer

27-54-05
27-54-05
27-54-05
27-54-05
57-52-21
57-52-21
27-54-46
27-54-46

33U-150A
33V-150
33U-030A
33V-030
02C-240
02C-220
04B-035
04B-080

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-50-00-000-002
27-50-00-400-002
27-50-00-866-008
27-50-00-866-009
27-50-00-866-011
27-50-00-866-012
27-51-00-820-003
27-51-00-820-008
27-51-44-400-001
27-54-00-710-001
27-54-61-000-002
27-54-61-400-006
27-60-00-866-002
27-64-00-710-001
32-12-00-410-001
53-35-11-000-001
53-35-11-400-001
54-55-00-000-001
54-55-00-400-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Inboard and Outboard Flap
Hoisting-Sling
Installation of the Inboard and Outboard Flap
Hoisting-Sling
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Manual Extension of the Flaps
Manual Retraction of the Flaps
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Installation of the Interconnecting Strut
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Close the Main Gear Doors after Access
Removal of the Wing-to-Fuselage Fairings
Installation of the Wing-to-Fuselage Fairings
Removal of the Aft Movable Fairing
Installation of the Aft Movable Fairing



EFF :
ALL
 27-54-61



AIJ




Page 420
May 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-55-11-010-001
57-55-11-410-001

27-54-61-991-001
27-54-61-991-012
27-54-61-991-005
27-54-61-991-006
27-54-61-991-013
27-54-61-991-007
27-54-61-991-049-A
27-54-61-991-008

To Lower the Flap Track No. 2 Movable Fairing for


Access
To Lift the Flap Track No. 2 Movable Fairing after
Access
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405
Fig. 406
Fig. 407
Fig. 408

3. __________
Job Set-up
Subtask 27-54-61-941-060
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is on the panel 400VU to tell
persons not to operate the landing gear.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-54-61-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-61



AIJ




Page 421
May 01/11

Subtask 27-54-61-860-058
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are in the position 3 (Ref. TASK 27-50-00866-011).
(2) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is on the
applicable torque shaft.
R
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position below
the applicable inboard flap.
(4) Make sure that the number 1 spoiler is fully extended (Ref. TASK 2760-00-866-002).
(5) Make sure that the applicable wing to fuselage panels 193AB(194AB),
193BB(194BB) have been removed (Ref. TASK 53-35-11-000-001).
(6) Make sure that the pylon aft movable fairing has been removed
(Ref. TASK 54-55-00-000-001).
(7) Make sure that the flap track No. 2 movable fairing has been removed
(Ref. TASK 57-55-11-010-001).
(8) Make sure that the flap kink seals have been removed (Ref. TASK 2754-61-000-002).
(9) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the slat/flap control lever.
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-61



AIJ




Page 422
May 01/11

Subtask 27-54-61-420-056
A. Install the Inboard Flap
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE
_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) If necessary, install the hoisting sling (Ref. TASK 27-50-00-400002).
(Ref. Fig. 408/TASK 27-54-61-991-008)
R
R

(2) Make sure that the flap cruise roller (126), at the outboard end of
the flap, is set to the minimum position.
(3) If necessary, remove the nut (123), the collar (122) and the serrated
plate (124).
(4) Turn the eccentric (125) until the minimum alignment marks are
aligned.
(5) Install the serrated plate (124), the collar (122) and the nut (123).
Tighten the nut (123) by hand.
(6) Make sure that the flap is set to its lowest position. At this
position:
- the painted (red) marks of the spherical bearing are aligned,
and/or
- the hole of the spherical bearing is at its maximum aft position.
(7) If necessary, repair the painted (red) marks.
(Ref. Fig. 406/TASK 27-54-61-991-007)
(8) Use TAPE - ADHESIVE to keep the eccentric disc (114) in position on
the inboard flap drive trunnion.
(Ref. Fig. 402/TASK 27-54-61-991-012)
(9) Make sure that the interconnecting strut (10) is safetied to the
outboard flap with adhesive tape.



EFF :
ALL
 27-54-61



AIJ




Page 423
Aug 01/11

Alignment of the Outboard Cruise-Roller of the Inboard Flap.


Figure 408/TASK 27-54-61-991-008


EFF :
ALL
 27-54-61


R 
AIJ




Page 424
Nov 01/08

(10) With the hoist and the hoisting sling, carefully lift the flap and
put it in position over the wing.
CAUTION : MAKE SURE THAT THE FLAP DOES NOT HIT THE AIRCRAFT
_______
STRUCTURE.
(a) Lower the flap with the hoist and engage the flap drive trunnion
in the flap track carriage at the track 1 position.
(b) Lower the outboard end of the flap and engage the flap in the
flap track carriage at the track 2 position.
(11) If necessary, use a clean MISCELLANEOUS (Material No. 19-003) made
moist with CLEANING AGENTS (Material No. 11-026) to clean the
eccentric disc (114) and to remove the remaining adhesive tape.
Subtask 27-54-61-480-051
B. Installation of Support Equipment
(Ref. Fig. 404/TASK 27-54-61-991-006, 405/TASK 27-54-61-991-013)
R

(1) Assemble the EXTRACTOR - PIN, TRACK 4 on the bolt (181).


Subtask 27-54-61-420-051
C. Continue with the Installation Procedure

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) At the track 1 position:
(Ref. Fig. 406/TASK 27-54-61-991-007)
(a) Install the eccentric bush (107) on the flap drive-trunnion. If
necessary, carefully move the flap with the hoist and the sling
to let you install the eccentric bush (107).
(b) Axis align the anti-rotation spigot of the eccentric bush (107)
with the hole in the outer diameter of the eccentric disc (114).
(c) Temporarily install the toothplate (108) and the locknut (110).



EFF :
ALL
 27-54-61



AIJ




Page 425
May 01/11

(2) At the track 2 position:


(Ref. Fig. 404/TASK 27-54-61-991-006, 405/TASK 27-54-61-991-013)
CAUTION : MAKE SURE THAT THE SPLINED BUSH IS FULLY ENGAGED WITH THE
_______
SPHERICAL BEARING. THIS PREVENTS DAMAGE TO THE PARTS.
(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
bolt (181) and the splined bush (180).
(b) Installation of the carriage bolt:
CAUTION : THE FLAP TO CARRIAGE BOLT ASSEMBLY HAS AN INNER AND AN
_______
OUTER BOLT WHICH MAKE ONE PART.
DO NOT APPLY AN END OR A TORSION FORCE TO THE INNER
BOLT BECAUSE THIS WILL CAUSE DAMAGE TO THE ASSEMBLY.
APPLY FORCE TO THE OUTER BOLT ONLY WHEN YOU
REMOVE/INSTALL THE BOLT ASSEMBLY.
1
_

Use the EXTRACTOR - PIN, TRACK 4 to install the carriage bolt


(181) in the flap track carriage.

(c) Install the splined bush (180) correctly over the bolt (181).
(d) Remove the EXTRACTOR - PIN, TRACK 4 from the bolt (181).
(e) Temporarily install the locking plate (179) and the nut (174)
hand tight only.
(f) Make sure that the failsafe hook nuts (184) are hand tight only.
(3) Hold the trailing edge of the flap and lower the hoisting sling
sufficiently to let the flap move forward.
(4) Manually push the flap forward until the flap drive arms engage with
the rotary actuator drive-levers.



EFF :
ALL
 27-54-61


R 
AIJ




Page 426
May 01/11

Subtask 27-54-61-420-054
D. Connect the Flap Drive Arms to the Rotary Actuator Drive-Levers
(Ref. Fig. 403/TASK 27-54-61-991-005)
(1) At the track 1 position:
(a) Connect the flap drive arm to the rotary actuator drive-lever as
follows:
1
_

Put the rotary actuator drive-lever in position on the flap


drive arm.

2
_

Install the bolt (79), the washer (78) and the nut (76).

(2) At the track 2 position:


(a) Connect the flap drive arm to the rotary actuator drive-lever as
follows:
1
_

Put the rotary actuator drive-lever in position on the flap


drive arm.

2
_

Install the bolt (80), the washer (81) and the nut (82).

Subtask 27-54-61-860-056
E. Aircraft Configuration
(1) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).
(2) Lower the spoilers as follows:
R
R

(a) Connect a WRENCH - PNEUMATIC to the ADAPTOR-DRIVE, SLAT (AND


FLAP) and slowly move the flaps to the fully retracted position.
(b) Lower the spoilers (Ref. TASK 27-60-00-866-002).
NOTE : The spoiler may rest on the upper surface of the flap.
____
(c) On the servo-control, make sure that the pointer on the hexagon
head is opposite the letter O (Operation) on the housing.



EFF :
ALL
 27-54-61



AIJ




Page 427
May 01/11

Subtask 27-54-61-820-051
F. Check and Adjustment of the Inboard Flap Rigged Position
NOTE : Before you do the rigging procedure, make sure that:
____
- the aircraft weight is on the landing gear or on jacks
- the number 1 and the number 2 engines are both installed or not
installed
- the fuel load is symmetrical or the wing tanks are empty
- the flaps are fully retracted (Ref. TASK 27-50-00-866-012).
(1) Install the sharks fin flap rigging kit and do a check of the inboard
flap rigged position (Ref. TASK 27-51-00-820-003).
(2) If necessary, adjust the inboard flap rigged position (Ref. TASK 2751-00-820-008).
Subtask 27-54-61-420-052
G. Continue to Connect the Flap Drive Arms
(1) At the track 1 position:
(Ref. Fig. 403/TASK 27-54-61-991-005)
(a) Safety the flap drive arm to the rotary actuator drive-lever as
follows:
1
_

Make sure that the bolt (79), the washer (78) and the nut (76)
are correctly installed.

2
_

TORQUE the nut (76) to between 1.2 and 1.8 m.daN (106.19 and
159.29 lbf.in).

3
_

Safety the nut (76) with a new cotter pin (77).

(2) At the track 2 position:


(a) Safety the flap drive arm to the rotary actuator drive-lever as
follows:

R
R

1
_

Make sure that the bolt (80), the washer (81) and the nut (82)
are correctly installed.

2
_

TORQUE the nut (82) to between 1.8 and 2.3 m.daN (13.27 and
16.96 lbf.ft).

3
_

Safety the nut (82) with a new cotter pin (83).



EFF :
ALL
 27-54-61



AIJ




Page 428
Aug 01/11

Subtask 27-54-61-420-073
H. Safety the Inboard Flap Connections
(Ref. Fig. 404/TASK 27-54-61-991-006)
(1) At the track 2 position:
(a) Make sure that the failsafe hook nuts (184) are hand tight only.
(b) Remove the nut (174).
(c) Make sure that the spherical bearing, the splined bush (180) and
the locking plate (179) are engaged correctly.
(d) Install a new crushable spacer (176) and the nut (174).
(e) TORQUE the nut (174) to between 15 and 20 m.daN (110.61 and
147.49 lbf.ft).
(f) Safety the nut (174) with a new cotter pin (175).
(g) Install the washer (178) and the nut (177).
Subtask 27-54-61-220-055
J. Do a Check of the Flap Rigged Position
(1) Make sure that the inboard flap remains in the correct rigged
position (Ref. TASK 27-51-00-820-003).
Subtask 27-54-61-420-074-A
K. Continue to Safety the Inboard Flap Connections
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE
_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(Ref. Fig. 406/TASK 27-54-61-991-007, 407/TASK 27-54-61-991-049-A)
(1) At the track 1 position:
(a) TORQUE the locknut (110) using the ADAPTER-TORQUE-TRUNNION NUT to
between 5.4 and 7.0 m.daN (39.82 and 51.62 lbf.ft).
(b) Lock the locknut (110) with the lockwasher (109).
(c) Install the washer (120) and the screw (121).
(d) Tighten the screw (121).



EFF :
ALL
 27-54-61


R 
AIJ




Page 429
Aug 01/11

(e) Apply a layer of BONDING AND ADHESIVE COMPOUNDS (Material No. 08004A) to the retainer (113).
(f) Install the retainer (113), the tabwasher (112) and the bolt
(111).
(g) TORQUE the bolt (111) to between 1.0 and 1.5 m.daN (88.49 and
132.74 lbf.in) and safety with the tabwasher (112).
(2) At the track 2 position:
(a) TORQUE the nuts (184) to 0.12 m.daN (10.61 lbf.in) maximum.
R
R
R

WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE.


_______
CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE
TASK. LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
(b) Safety the nuts (184) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-54-61-820-068
L. Completion of the Flap Rigging Procedure
(1) Complete the flap rigging procedure (Ref. TASK 27-51-00-820-008).
Subtask 27-54-61-220-051
M. Alignment of the Outboard Cruise Roller of the Inboard Flap
(Ref. Fig. 408/TASK 27-54-61-991-008)

R
R

(1) Measure the dimension Y. This must be 6.0 mm (0.2362 in.) minus the
dimension X, plus or minus 0.5 mm (0.0196 in.). If the dimension Y is
not correct you must adjust the cruise roller (126).

(2) To adjust the cruise roller (126):


(a) Remove the nut (123), the collar (122) and the serrated plate
(124).
(b) Turn the eccentric (125) until the dimension Y is correct.
(c) Lock the eccentric (125) with the serrated plate (124).
(d) Install the collar (122) and the nut (123).



EFF :
ALL
 27-54-61



AIJ




Page 430
Aug 01/11

(e) TORQUE the nut (123) to between 4.8 and 5.4 m.daN (35.39 and
39.82 lbf.ft).
(3) Measure the dimension Y again.
(4) Measure and record the clearance between the bottom surface of the
shroud box and the flap upper surface (measured at the outboard end
of the shroud box). This must be between 5 mm (0.1968 in.) and 12 mm
(0.4724 in.).
Subtask 27-54-61-916-052
R

N. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(Ref. Fig. 403/TASK 27-54-61-991-005, 404/TASK 27-54-61-991-006, 406/TASK
27-54-61-991-007, 408/TASK 27-54-61-991-008)
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolt (111)
- the nut (174), the cotter pin (175), the nut (177), the washer
(178) and the bolt (181)
- the bolt (79), the washer (78), the nut (76) and the cotter pin
(77)
- the bolt (80), the washer (81), the nut (82) and the cotter pin
(83)
- the nut (123).
Subtask 27-54-61-420-053

P. Installation of the Bonding Straps


(Ref. Fig. 403/TASK 27-54-61-991-005, 404/TASK 27-54-61-991-006, 406/TASK
27-54-61-991-007)
(1) Attach the bonding strap from the flap carriage at track 2 to the
flap bracket with the bolt (182) and the nut (183) (Ref. TASK 20-2800-912-004).
(2) Attach the bonding strap (74) between the inboard flap and the
outboard flap with the bolt (75) and the nut (73) (Ref. TASK 20-2800-912-004).
(3) Attach the bonding strap (71) with the bolt (72) and the nut (70)
(Ref. TASK 20-28-00-912-004).



EFF :
ALL
 27-54-61



AIJ




Page 431
May 01/11

Subtask 27-54-61-860-057
R

Q. Aircraft Configuration
(1) Install the interconnecting strut (Ref. TASK 27-51-44-400-001).
(2) Connect the electrical connectors:
(Ref. Fig. 402/TASK 27-54-61-991-012)
(a) Remove the blanking caps from the electrical connector(s).
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(c) Connect the electrical connectors (21) and (22).
(3) Manually retract the flaps (Ref. TASK 27-50-00-866-012).

(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION.


(5) Extend the flaps to position 1 (Ref. TASK 27-50-00-866-008).
(6) Install the flap kink seals (Ref. TASK 27-54-61-400-006).
Subtask 27-54-61-410-051

R. Close Access
(Ref. Fig. 401/TASK 27-54-61-991-001)
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Lift the flap track No. 2 movable fairing (Ref. TASK 57-55-11-410001).
(3) Install the pylon aft moveable fairing (Ref. TASK 54-55-00-400-001).
(4) Install the fairing panels 193AB(194AB) and 193BB(194BB) (Ref. TASK
53-35-11-400-001).
(5) Extend the flaps (Ref. TASK 27-50-00-866-008) sufficiently to install
the rubbing strip (2).
(6) Install the rubbing strip (2) and the support (1).



EFF :
ALL
 27-54-61



AIJ




Page 432
May 01/11

Subtask 27-54-61-866-058
S. Retract the Flaps
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Put the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER on the flap/slat
control lever on panel 114VU.
Subtask 27-54-61-820-055
T. Adjust the Wing to Fuselage Panels
(Ref. Fig. 401/TASK 27-54-61-991-001)
(1) Measure the dimension X, this must be between 23.5 mm (0.9251 in.)
and 22.5 mm (0.8858 in.).
(2) Measure the dimension U, this must be between 33.5 mm (1.3188 in.)
and 32.5 mm (1.2795 in.).
(3) If the dimension X is not correct loosen the screws (5) and move the
aft seal until the dimension X is correct.
(4) If the dimension U is not correct, loosen the screws (4) and move the
forward seal until the dimension U is correct.
(5) TORQUE the applicable screws (4) and/or (5) to between 0.4 and 0.45
m.daN (35.39 and 39.82 lbf.in).
Subtask 27-54-61-865-060
U. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2

6CV
8CV



EFF :
ALL
 27-54-61



AIJ




B07
Q21

Page 433
Aug 01/11

Subtask 27-54-61-710-050
V. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Do an operational test of the spoiler system (Ref. TASK 27-64-00-710001).
5. Close-up
________
Subtask 27-54-61-942-051
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the access platform(s).
(4) Close the MLG doors (Ref. TASK 32-12-00-410-001).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-61


R 
AIJ




Page 434
Aug 01/11

TASK 27-54-61-000-002
Removal of the Flap Kink-Seals and Cushion-Seals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

safety barriers
1 WARNING NOTICE(S)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
ASRM 575300
27-54-61-991-003-A
27-54-61-991-002

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
(for corrective action)
Fig. 409
Fig. 410



EFF :
ALL
 27-54-61



AIJ




Page 435
Nov 01/10

3. __________
Job Set-up
Subtask 27-54-61-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S) in position in the cockpit to tell persons
not to operate the flight controls.
Subtask 27-54-61-860-061
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend/retract the flaps to position 1 (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-61-020-053
A. Removal of the Flap Kink-Seals and Cushion-Seals
(Ref. Fig. 409/TASK 27-54-61-991-003-A, 410/TASK 27-54-61-991-002)
NOTE : If a structural repair has been done, you must refer to (Ref. ASRM
____
575300) for removal of the Flap Kink-Seals.
(1) Remove the lower kink-seal:
(a) Remove the screws (8) and the lower kink-seal (7).



EFF :
ALL
 27-54-61



AIJ




Page 436
Nov 01/10

Details of the Kink-Seals and Cushion-Seals (Outboard Flap)


Figure 409/TASK 27-54-61-991-003-A


EFF :
ALL
 27-54-61


R 
AIJ




Page 437
Nov 01/08

Details of the Kink-Seals and Cushion-Seals (Inboard Flap)


Figure 410/TASK 27-54-61-991-002


EFF :
ALL
 27-54-61


R 
AIJ




Page 438
Nov 01/08

(2) Remove the outboard flap upper kink-seal and cushion seal:
(a) Remove the screws (1), the pressure plate (2) and the upper
kink-seal (3).
(b) Remove the screws (4) and (6) and the cushion seal (5).
(3) Remove the inboard flap upper kink-seal and cushion seal:
(a) Remove the screws (19), the retainer (20) and the upper kink-seal
(21).
(b) Remove the screws (22) and (23) and the cushion seal (24).



EFF :
ALL
 27-54-61


R 
AIJ




Page 439
Nov 01/08

TASK 27-54-61-400-006
Installation of the Flap Kink-Seals and Cushion-Seals
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
98D27504009000
98D27504010000
98D27803000000

AR SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 ADJUSTER-KINK SEAL (UPPER FWD WY5396)
1 ADJUSTER-KINK SEAL (UPPER AFT WY5658)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-54-61



AIJ




Page 440
Nov 01/10

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

2
3
5
5
5
5
5
5
5
5
5
7
20
21
24
24
24
24
24
24

clamping strip
upper kink-seal
cushion-seal (0)
cushion-seal (1)
cushion-seal (0)
cushion-seal (1)
cushion-seal (0)
cushion-seal (1)
cushion-seal (0)
cushion-seal (0)
cushion-seal (0)
lower kink-seal
seal retainer
upper kink-seal
cushion-seal (0)
cushion-seal (1)
cushion-seal (0)
cushion-seal (1)
cushion-seal (0)
cushion-seal (1)

57-53-21
57-53-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-53-21
57-53-21
57-53-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21
57-52-21

05 -020A
05 -040
06C-160
06C-160
06C-160A
06C-160A
06C-160B
06C-160B
05 -160C
05 -160D
05 -160E
06C-180
06C-120
06C-100
06C-150
06C-150
06C-150A
06C-150A
06C-150B
06C-150B

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
ASRM 575300
27-54-61-991-003-A
27-54-61-991-002
27-54-61-991-011

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
(for corrective action)
Fig. 409
Fig. 410
Fig. 411



EFF :
ALL
 27-54-61



AIJ




Page 441
Feb 01/09

3. __________
Job Set-up
Subtask 27-54-61-941-061
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S)S are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-54-61-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are at position 1 (Ref. TASK 27-50-00-866008) (Ref. TASK 27-50-00-866-009).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the slat/flap control lever.
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-61-420-087
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-54-61



AIJ




Page 442
Nov 01/10

Subtask 27-54-61-420-069
B. Installation of the Flap Kink-Seals and Cushion-Seals
(Ref. Fig. 409/TASK 27-54-61-991-003-A, 410/TASK 27-54-61-991-002)
NOTE : If a structural repair has been done, you must refer to (Ref. ASRM
____
575300) for installation of the Flap Kink-Seals.
(1) Do the holes through cushion-seal (24) if necessary:
(a) Put the cushion-seal (24) in position and make marks for
corresponding holes of screws (22) and (23).
(b) Remove the cushion-seal (24).
(c) Drill the holes to diameter of 5.5 mm (0.2165 in.) and deburr the
holes.
(2) Attach the cushion-seal (24) to the inboard flap with the screws (22)
and (23).
(3) TORQUE the screws (22) and (23) to between 0.4 and 0.45 m.daN (35.39
and 39.82 lbf.in).
(4) Do the holes through cushion-seal (5) if necessary:
(a) Put the cushion-seal (5) in position and make marks for
corresponding holes of screws (4) and (6).
(b) Remove cushion-seal (5)
(c) Drill the holes to diameter of 5.5 mm (0.2165 in.) and deburr the
holes.
(5) Attach the cushion-seal (5) to the outboard flap with the screws (4)
and (6).
(6) TORQUE the screws (4) and (6) to between 0.4 and 0.45 m.daN (35.39
and 39.82 lbf.in).
Subtask 27-54-61-420-070
C. Installation of the Upper Kink-Seals
(Ref. Fig. 409/TASK 27-54-61-991-003-A, 410/TASK 27-54-61-991-002)
R

(1) Install the upper kink-seal (21), the seal retainer (20) and the
screws (19) on the inboard flap. Do not tighten the screws (19).



EFF :
ALL
 27-54-61



AIJ




Page 443
Feb 01/09

(2) Install the upper kink-seal (3), the clamping strip (2) and the
screws (1) on the outboard flap. Do not tighten the screws (1).
(Ref. Fig. 411/TASK 27-54-61-991-011)
(3) Install the ADJUSTER-KINK SEAL (UPPER FWD WY5396) on the flap seals
at position WY5396.
(4) Install the ADJUSTER-KINK SEAL (UPPER AFT WY5658) on the flap seals
at position WY5658.
(5) Tighten the star-knob on both tools at the same time until they
cannot move. This will compress the seals together.
(6) Set the seals and the clamping strips equally between the inboard
flap and the outboard flap.
(7) TORQUE the screws (1) and (19) to between 0.4 and 0.45 m.daN (35.39
and 39.82 lbf.in).
(8) Remove the ADJUSTER-KINK SEAL (UPPER FWD WY5396) and the ADJUSTERKINK SEAL (UPPER AFT WY5658) from the flap seals.
Subtask 27-54-61-420-071
D. Installation of the Lower Kink-Seals
(Ref. Fig. 409/TASK 27-54-61-991-003-A, 410/TASK 27-54-61-991-002)
(1) Attach the lower kink-seal (7) to the inboard and outboard flap with
the screws (8).
5. Close-up
________
Subtask 27-54-61-860-051
A. Aircraft Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
slat/flap control lever.
(3) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :
ALL
 27-54-61


R 
AIJ




Page 444
Nov 01/08

Kink Upper-Seal Installation Tool.


Figure 411/TASK 27-54-61-991-011


EFF :
ALL
 27-54-61


R 
AIJ




Page 445
Nov 01/08

Subtask 27-54-61-942-058
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-61


R 
AIJ




Page 446
Nov 01/08

TASK 27-54-61-000-005
Removal of the Inboard Flap Seals
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.0 m (9 ft. 10 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-54-61-991-050

Extension of the Flaps on the Ground


Fig. 412



EFF :
ALL
 27-54-61


R 
AIJ




Page 447
Nov 01/08

3. __________
Job Set-up
Subtask 27-54-61-941-065
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice on the panel 400VU to tell persons not to
operate the landing gear.
(3) Put a warning notice in position in the cockpit to tell persons not
to operate the flight controls.
Subtask 27-54-61-860-062
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the slat/flap control lever.
Subtask 27-54-61-865-058
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-61-010-056
D. Get Access
(1) Put the access platform below the applicable inboard flap, zone
581(681).



EFF :
ALL
 27-54-61


R 
AIJ




Page 448
Nov 01/08

4. Procedure
_________
(Ref. Fig. 412/TASK 27-54-61-991-050)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-61-020-063
A. Removal of the Inboard Flap Seals
(1) Remove the flap seals as follows:
(a) Remove the screws (1).
(b) Remove the screws (3) and the cover strip (4).
(c) Carefully remove the seal assemblies (2) and (5) from the inboard
end of the flap.



EFF :
ALL
 27-54-61


R 
AIJ




Page 449
Nov 01/08

Inboard Flap Seals - Location and Detail


Figure 412/TASK 27-54-61-991-050


EFF :
ALL
 27-54-61


R 
AIJ




Page 450
Nov 01/08

TASK 27-54-61-400-007
Installation of the Inboard Flap Seals
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27803000000

safety barriers
warning notice
access platform 3.0 m (9 ft. 10 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-54-61


R 
AIJ




Page 451
Nov 01/08

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-50-00-866-009
27-54-61-400-001
27-54-61-991-050

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Installation of the Inboard Flap
Fig. 412

3. __________
Job Set-up
Subtask 27-54-61-941-066
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is on the panel 400VU to tell
persons not to operate the landing gear.
(3) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.
Subtask 27-54-61-860-063
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the slat/flap control lever.
(3) Make sure that the access platform is below the applicable inboard
flap, zone 581(681).



EFF :
ALL
 27-54-61



AIJ




Page 452
Nov 01/08

4. Procedure
_________
(Ref. Fig. 412/TASK 27-54-61-991-050)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-61-420-088
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
Subtask 27-54-61-420-089
B. Installation of the Inboard Flap Seals
(1) Install the flap seals as follows:
(a) Position the seal assemblies (2) and (5) on the inboard end of
the flap.
(b) Install the screws (1).
(c) Install the cover strip (4) and the screws (3).
(d) TORQUE the screws (1) and (3) to between 0.4 and 0.45 m.daN
(35.39 and 39.82 lbf.in).
(e) Check and, if necessary, adjust the flap seals for the correct
flap seal to belly-fairing dimensions (Ref. TASK 27-54-61-400001).



EFF :
ALL
 27-54-61



AIJ




Page 453
Nov 01/08

5. Close-up
________
Subtask 27-54-61-865-059
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-61-860-064
B. Aircraft Maintenance Configuration
(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
Subtask 27-54-61-942-060
C. Removal of Equipment
(1) Remove the access platform(s).
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-61



AIJ




Page 454
Nov 01/08

Adjustment of the Track 1 Forward Eccentric


Figure 413/TASK 27-54-61-991-009


EFF :
ALL
 27-54-61



AIJ




Page 455
Nov 01/08

INBOARD FLAP - INSPECTION/CHECK


_______________________________
R

TASK 27-54-61-220-001
Dimensional Check of the Joints that Connect the Flap Actuator Levers to the
Flap Drive Struts (Tracks 1 and 2)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement of the inboard flap is more than that in TASK
27-54-00-200-003.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
access platform 2 m (6 ft. 7 in.)



EFF :
ALL
 27-54-61



AIJ




Page 601
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-55-000-001
27-54-55-400-001
R

27-54-61-991-048

Removal of the Flap-Actuator Lever Assembly - Tracks


1 and 2
Installation of the Flap-Actuator Lever Assembly Tracks 1 and 2
Fig. 601

3. __________
Job Set-up
Subtask 27-54-61-941-064
A. Safety Precautions
(1) Put a warning notice on the flap/slat control lever (panel 114VU) to
tell persons not to operate the flaps.
(2) Put the safety barriers in position.
Subtask 27-54-61-010-055
B. Get Access
(1) Put the access platform below the applicable zone 573 or 673.
(2) Disconnect the joints at tracks 1 and 2 that connect the actuator
levers to the drive struts(Ref. TASK 27-54-55-000-001).
4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-54-61-991-048)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-61



AIJ




Page 602
Feb 01/07

R
R

Inboard Flap - Fits and Clearances (Tracks 1 and 2)


Figure 601/TASK 27-54-61-991-048



EFF :
ALL
 27-54-61



AIJ




Page 603
Feb 01/07

Subtask 27-54-61-220-066
A. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 1).
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 9.080 | 9.095 |
|
| 9.060 |
|
|
| OD 1
|(0.3574) |(0.3580) |
|
|(0.3566) |
|
|
|
|
|
| 0.005 | 0.035 |
|
| 0.075 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0029)|
| A
| 9.100 | 9.115 |
|
|
| 9.135 |
|
| ID 3
|(0.3582) |(0.3588) |
|
|
|(0.3596) |
|
------------------------------------------------------------------------------Subtask 27-54-61-220-067
B. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 1)
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 11.076 | 11.094 |
|
| 11.054 |
|
|
| OD 3
|(0.4360) |(0.4367) |
|
|(0.4351) |
|
|
|
|
|
| 0.006 | 0.037 |
|
| 0.081 |
|
|
|
| (0.0002)| (0.0014)|
|
|(0.0031)|
| A
| 11.100 | 11.113 |
|
|
| 11.135 |
|
| ID 2
|(0.4370) |(0.4375) |
|
|
|(0.4383) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-61


R 
AIJ




Page 604
Feb 01/07

Subtask 27-54-61-220-068
C. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 2)
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.841 | 15.859 |
|
| 15.807 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6223) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.120 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0047)|
| B
| 15.875 | 15.893 |
|
|
| 15.927 |
|
| ID 4
|(0.6250) |(0.6257) |
|
|
|(0.6270) |
|
------------------------------------------------------------------------------Subtask 27-54-61-220-069
D. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 2)
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.841 | 15.859 |
|
| 15.822 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6229) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.072 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0028)|
| B
| 15.862 | 15.875 |
|
|
| 15.894 |
|
| ID 7
|(0.6244) |(0.6250) |
|
|
|(0.6257) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-61


R 
AIJ




Page 605
Feb 01/07

Subtask 27-54-61-220-070
E. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 2)
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.841 | 15.859 |
|
| 15.781 |
|
|
| OD 5
|(0.6236) |(0.6243) |
|
|(0.6212) |
|
|
|
|
|
| 0.046 | 0.074 |
|
| 0.194 |
|
|
|
| (0.0018)| (0.0029)|
|
|(0.0076)|
| B
| 15.905 | 15.915 |
|
|
| 15.975 |
|
| ID 8
|(0.6261) |(0.6265) |
|
|
|(0.6289) |
|
------------------------------------------------------------------------------Subtask 27-54-61-220-071
F. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Track 2)
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 4
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| B
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 6
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-61


R 
AIJ




Page 606
Feb 01/07

5. Close-up
________
Subtask 27-54-61-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Connect the joints at tracks 1 and 2 to connect the actuator levers
to the drive struts (Ref. TASK 27-54-55-400-001)
Subtask 27-54-61-942-059
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-61


R 
AIJ




Page 607
Feb 01/07

OUTBOARD FLAP - REMOVAL/INSTALLATION


____________________________________
TASK 27-54-62-000-001
Removal of the Outboard Flap
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
98D27504084000
98D27803000000

adhesive tape
blanking caps
covers
safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)
1 EXTRACTOR - PIN, TRACK 4
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-62


R 
AIJ




Page 401
Nov 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-002
27-50-00-400-002
27-50-00-866-009
27-50-00-866-011
27-50-00-866-012
27-51-00-820-004
27-54-61-000-002
27-60-00-866-002
57-51-37-000-002
57-51-37-000-004
R

57-55-11-000-001
57-55-11-010-002
27-54-62-991-007
27-54-62-991-009
27-54-62-991-010
27-54-62-991-014

Removal of the Inboard and Outboard Flap


Hoisting-Sling
Installation of the Inboard and Outboard Flap
Hoisting-Sling
Retraction of the Flaps on the Ground
Manual Extension of the Flaps
Manual Retraction of the Flaps
Adjustment of the Forward Eccentrics to the Datum
Position
Removal of the Flap Kink-Seals and Cushion-Seals
Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
To Lower the Flap Track No. 3 & No. 4 Movable
Fairings for Access
Fig. 401
Fig. 402
Fig. 403
Fig. 404

3. __________
Job Set-up
Subtask 27-54-62-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in position to tell persons not to pressurize
the hydraulic system.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.



EFF :
ALL
 27-54-62



AIJ




Page 402
Nov 01/10

Subtask 27-54-62-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are retracted fully (Ref. TASK 27-50-00-866009).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the slat/flap control lever.
Subtask 27-54-62-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-62-010-050
D. Get Access
(1) Put the access platform in position for the applicable zones:
- for the left wing, below zones 575 and 587
- for the right wing, below zones 675 and 687.
(2) Remove the access panels for the applicable wing:
(a) For the LH wing:
- remove 573CB (Ref. TASK 57-51-37-000-002)
- remove 575AB, 575BB (Ref. TASK 57-51-37-000-004).
(b) For the RH wing:
- remove 673CB (Ref. TASK 57-51-37-000-002)
- remove 675AB, 675BB (Ref. TASK 57-51-37-000-004).
R
R

(3) Do one of the two worksteps that follow.

R
R

(a) Lower the flap track No. 3 and No. 4 movable fairings for access
(Ref. TASK 57-55-11-010-002).

R
R

(b) Remove the flap track No. 3 and No. 4 movable fairings for access
(Ref. TASK 57-55-11-000-001).



EFF :
ALL
 27-54-62



AIJ




Page 403
Nov 01/10

Subtask 27-54-62-865-067
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-62-860-065
F. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Manually extend the flaps to position 1 (Ref. TASK 27-50-00-866-011).
(2) Remove the flap kink seals (Ref. TASK 27-54-61-000-002).
Subtask 27-54-62-865-068
G. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-62


R 
AIJ




Page 404
Feb 01/07

Subtask 27-54-62-020-059
A. Preparation for Removal of the Outboard Flap
(Ref. Fig. 401/TASK 27-54-62-991-007)
(1) Disconnect the interconnecting strut (1):
(a) Remove the electrical connectors (8) and (10) from the connectors
(7) and (9).
R

(b) Put blanking caps on the disconnected electrical connector(s).


(c) Remove and discard the cotter pin (11).
(d) Remove the nut (6) and the washer (5).
(e) Remove the bolt (2), the washer (3) and the bush (4).
(f) Hold the interconnecting strut (1) to the outboard flap with
adhesive tape.
Subtask 27-54-62-860-054
B. Aircraft Maintenance Configuration
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the applicable
torque shaft.
(2) Manually fully retract the flaps to the zero position (Ref. TASK 2750-00-866-012).
(3) Check the value shown on the label at the track 3 position. If the
label shows a value different from 0, set the flap forward
eccentrics to the zero datum position (Ref. TASK 27-51-00-820-004).
NOTE : The label is on the outboard side of the flap track beam.
____
(4) Manually extend the flaps to position 3 (Ref. TASK 27-50-00-866-011).
(5) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is on the
applicable torque shaft.



EFF :
ALL
 27-54-62



AIJ




Page 405
May 01/10

R
R

Interconnecting Strut - Location and Detail


Figure 401/TASK 27-54-62-991-007



EFF :
ALL
 27-54-62



AIJ




Page 406
Feb 01/07

Subtask 27-54-62-020-051
C. Removal of the Outboard Flap
CAUTION : OPERATE THE HOIST SLOWLY, WHEN YOU PUT THE SLING IN TENSION. DO
_______
NOT TRY TO REMOVE THE FLAP BECAUSE THIS WILL CAUSE DAMAGE.
(1) Install the hoisting sling (Ref. TASK 27-50-00-400-002).
(2) Use the hoist to carefully lift the hoisting sling until it holds the
weight of the outboard flap.
(3) Fully extend and lock the applicable spoilers 2, 3, 4 and 5
(Ref. TASK 27-60-00-866-002).
(4) Install the COLLAR-SAFETY, SPOILER on the applicable rods of the
servo controls.
(5) Disconnect the flap drive arms from the rotary actuator drive-levers:
(Ref. Fig. 402/TASK 27-54-62-991-009)

(a) Remove the bolts (51) and the washers (50), and disconnect the
bonding straps (49).
(b) Remove the nut (54), the bolt (52) and disconnect the bonding
strap (53).
(c) Hold the trailing edge of the outboard flap and remove:
- the cotter pins (58)
- the nuts (57)
- the washers (56)
- the bolts (55).
(d) Discard the cotter pins (58).
(e) Carefully move the outboard flap until the flap track carriages
touch the end stops.
(6) Disconnect the outboard flap from the flap track carriages:
(Ref. Fig. 403/TASK 27-54-62-991-010)

CAUTION : THE FLAP TO CARRIAGE BOLT ASSEMBLY HAS AN INNER AND AN


_______
OUTER BOLT WHICH MAKE ONE PART.
DO NOT APPLY AN END OR A TORSION FORCE TO THE INNER BOLT
BECAUSE THIS WILL CAUSE DAMAGE TO THE ASSEMBLY. APPLY FORCE
TO THE OUTER BOLT ONLY WHEN YOU REMOVE/INSTALL THE BOLT
ASSEMBLY.



EFF :
ALL
 27-54-62



AIJ




Page 407
Feb 01/07

R
R

Flap to Rotary Actuator Drive-Lever


Figure 402/TASK 27-54-62-991-009



EFF :
ALL
 27-54-62



AIJ




Page 408
Feb 01/07

R
R

Flap to Flap Carriage Connection


Figure 403/TASK 27-54-62-991-010



EFF :
ALL
 27-54-62



AIJ




Page 409
Feb 01/07

(a) Loosen the nuts (144) sufficiently to let the failsafe hook
assemblies (145) move.
(b) Remove these items:
- the cotter pins (137)
- the nuts (136)
- the crushable spacers (138)
- the nuts (139) and the washers (140)
- the locking plates (141)
- the splined bushes (142).
R
R
R
R

(7) Install the EXTRACTOR - PIN, TRACK 4 (98D27504084000) onto the


carriage bolt (143).
(Ref. Fig. 404/TASK 27-54-62-991-014)
NOTE : Make sure that you screw the extractor pin fully onto the
____
threads of each bolt (143). This will hold the locking ring in
position and allow it to be compressed by the bush and the
bearing.

(8) Remove the carriage bolts (143).


NOTE : If necessary, carefully lift the flap with the hoist and sling
____
sufficiently to release the weight off the bolts (143)

(9) Discard the cotter pins (137) and the crushable spacers (138).

(10) Remove the flap from the wing:


CAUTION : MAKE SURE THAT THE FLAP DOES NOT HIT THE AIRCRAFT
_______
STRUCTURE.
CAUTION : MAKE SURE THAT THE SUPPORT STRUCTURE IS CLEAN AND DOES NOT
_______
HAVE ANY SHARP POINTS.
(a) Carefully and slowly lift the outboard flap off the flap track
carriages.
(b) Move the outboard flap with the hoist and lower it onto the
support structure.

(11) Put covers, where necessary, over the disconnected items of the flap.



EFF :
ALL
 27-54-62



AIJ




Page 410
May 01/09

R
R

Flap Installation Tools


Figure 404/TASK 27-54-62-991-014



EFF :
ALL
 27-54-62



AIJ




Page 411
Feb 01/07

Subtask 27-54-62-080-050
D. Removal of Equipment
(1) If necessary, remove the hoisting sling from the outboard flap
(Ref. TASK 27-50-00-000-002).
(2) If necessary, remove the ADAPTOR-DRIVE, SLAT (AND FLAP) from the
right angle gearbox.



EFF :
ALL
 27-54-62


R 
AIJ




Page 412
May 01/09

TASK 27-54-62-400-001
Installation of the Outboard Flap
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific
98D27504084000
98D27604000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
1 EXTRACTOR - PIN, TRACK 4
1 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-54-62



AIJ




Page 413
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
Material No. 09-002
Material No. 11-026
Material No. 15-007
Material No. 19-003
Material No. 19-010

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS B
FUEL TANK SEALANTPOLYSULFID(NO LONGER AVAILABLE
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

58
137
138
155

cotter pins
cotter pins
crushable spacers
cotter pin

27-54-05
27-54-46
27-54-46
57-53-21



EFF :
ALL
 27-54-62



AIJ




35H-040
06B-035
06B-080
03B-340

Page 414
Feb 01/08

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-50-00-000-002
27-50-00-400-002
27-50-00-866-011
27-50-00-866-012
27-51-00-820-003
27-51-00-820-008
27-51-44-400-001
27-54-00-710-001
27-54-61-000-002
27-54-61-400-006
27-54-62-000-001
27-54-62-400-001
27-54-63-000-001
27-54-63-400-001
27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
57-51-37-000-002
57-51-37-000-004
57-51-37-400-002
57-51-37-400-004
R

57-55-11-000-001
57-55-11-010-002

R
R

57-55-11-400-001
57-55-11-410-002

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Inboard and Outboard Flap
Hoisting-Sling
Installation of the Inboard and Outboard Flap
Hoisting-Sling
Manual Extension of the Flaps
Manual Retraction of the Flaps
To do a Check of the Flap Rigged Position (with the
Sharks Fin)
Adjustment of the Flap Rigged Position with the
Sharks Fin Tool (A318/319/320)
Installation of the Interconnecting Strut
Operational Test of the Flap System
Removal of the Flap Kink-Seals and Cushion-Seals
Installation of the Flap Kink-Seals and Cushion-Seals
Removal of the Outboard Flap
Installation of the Outboard Flap
Removal of the Flap Guide-Roller Assembly
Installation of the Flap Guide-Roller Assembly
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Flap Track Fairings Nos. 2, 3 and 4
To Lower the Flap Track No. 3 & No. 4 Movable
Fairings for Access
Installation of the Flap Track Fairings Nos. 2, 3 and
4
To Lift the Flap Track No. 3 & No. 4 Movable Fairings
after Access



EFF :
ALL
 27-54-62



AIJ




Page 415
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-62-991-009
27-54-62-991-010
27-54-62-991-014
27-54-62-991-016
27-54-62-991-013
27-54-62-991-003
27-54-62-991-017

Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.

402
403
404
405
406
407
408

3. __________
Job Set-up
Subtask 27-54-62-941-060
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) are in position to tell persons
not to pressurize the hydraulic system.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-54-62-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-54-62-860-060
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-54-62



AIJ




Page 416
Aug 01/11

(1) Make sure that the rotary actuator drive-levers are in the position 3
(Ref. TASK 27-50-00-866-011).
(2) Make sure that the applicable spoilers 2, 3, 4 and 5 are fully
extended (Ref. TASK 27-60-00-866-002).
(3) Make sure that the COLLAR-SAFETY, SPOILER is on the applicable piston
rods of the servo-controls.
R
R

(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below the applicabl
- for the left wing, zone 575 and 587
- for the right wing, zones 675 and 687.
(5) Make sure that the applicable access panels have been removed:
(a) For the LH wing:
- 573CB (Ref. TASK 57-51-37-000-002)
- 575AB, 575BB (Ref. TASK 57-51-37-000-004)
(b) For the RH wing:
- 673CB (Ref. TASK 57-51-37-000-002)
- 675AB, 675BB (Ref. TASK 57-51-37-000-004).
(6) Make sure that the No. 3 and No. 4 movable fairings have been lowered
for access (Ref. TASK 57-55-11-010-002), or removed for access
(Ref. TASK 57-55-11-000-001).
(7) Make sure that the flap kink seals have been removed (Ref. TASK 2754-61-000-002).
(8) Make sure that the flaps are in the position 3 (Ref. TASK 27-50-00866-011).
(9) If necessary, remove the flap guide-roller assembly (Ref. TASK 27-5463-000-001).
(10) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the slat/flap control lever.
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-62



AIJ




Page 417
Aug 01/11

Subtask 27-54-62-420-096
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Make sure that the indicators (red) on the flap drive-arms, at track
positions 3 and 4, are not damaged or loose.
(Ref. Fig. 402/TASK 27-54-62-991-009)
Subtask 27-54-62-420-083
B. Not applicable.
Subtask 27-54-62-480-052
C. Installation of the Hoisting Sling
(1) If necessary, install the hoisting sling (Ref. TASK 27-50-00-400002).
Subtask 27-54-62-210-053
D. Alignment Checks before Installation
(1) Make sure that the spherical bearings are set to the datum position
with the flap and bearing paint marks aligned.
(Ref. Fig. 403/TASK 27-54-62-991-010)
(2) Make sure that the blade seal (124) is in the fully retracted
position.
(Ref. Fig. 405/TASK 27-54-62-991-016)
(3) Make sure that the cruise roller, at the inboard end of the outboard
flap, is aligned at the minimum position.
(Ref. Fig. 406/TASK 27-54-62-991-013)
(4) Make sure that the flap track carriages on the flap tracks 3 and 4
touch the end stops.
(Ref. Fig. 403/TASK 27-54-62-991-010)



EFF :
ALL
 27-54-62


R 
AIJ




Page 418
Aug 01/07

R
R

Blade Seal Details


Figure 405/TASK 27-54-62-991-016



EFF :
ALL
 27-54-62



AIJ




Page 419
Feb 01/07

R
R

Inboard Cruise Roller Alignment


Figure 406/TASK 27-54-62-991-013



EFF :
ALL
 27-54-62



AIJ




Page 420
Feb 01/07

Subtask 27-54-62-420-061
E. Installation of the Outboard Flap
CAUTION : MAKE SURE THAT THE FLAP DOES NOT HIT THE AIRCRAFT STRUCTURE.
_______
(1) With the hoist and the hoisting sling, carefully lift the flap and
position it over the wing.
(2) Lower the flap and engage the flap in the flap track carriages.
(3) Make sure that the flap is set to its lowest position. At this
position:
- the painted (red) marks on the spherical bearing are aligned,
and/or
- the hole of the spherical bearing is at its maximum aft position.
(4) If necessary, repair the painted (red) marks.
(Ref. Fig. 403/TASK 27-54-62-991-010)
(5) Make sure that the cruise roller, at the inboard end of the outboard
flap, is aligned at the minimum position.
(Ref. Fig. 406/TASK 27-54-62-991-013)
Subtask 27-54-62-420-059
F. Connect the Flap to the Carriages
(Ref. Fig. 403/TASK 27-54-62-991-010)
CAUTION : MAKE SURE THAT THE FLAP DOES NOT HIT THE FLANGE OF THE
_______
INTERCONNECTING STRUT IF YOU LIFT THE FLAP (TO ALIGN THE FLAP
TRACK CARRIAGES).
CAUTION : MAKE SURE THAT THE SPLINED BUSH IS FULLY ENGAGED WITH THE
_______
SPHERICAL BEARING. THIS PREVENTS DAMAGE TO THE PARTS.
CAUTION : THE FLAP TO CARRIAGE BOLT ASSEMBLY HAS AN INNER AND AN OUTER
_______
BOLT WHICH MAKE ONE PART.
DO NOT APPLY AN END OR A TORSION FORCE TO THE INNER BOLT
BECAUSE THIS WILL CAUSE DAMAGE TO THE ASSEMBLY. APPLY FORCE TO
THE OUTER BOLT ONLY WHEN YOU REMOVE/INSTALL THE BOLT ASSEMBLY.
(1) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
bolts (143) and the bushes (142).
R



EFF :
ALL
 27-54-62



AIJ




Page 421
May 01/09

R
R

(2) Install the EXTRACTOR - PIN, TRACK 4 onto the carriage bolt (143).
(Ref. Fig. 404/TASK 27-54-62-991-014)
NOTE : Make sure that you screw the extractor pin fully onto the
____
threads of each carriage bolt (143). This will hold the
locking ring in position and will let it be compressed by the
bush and the bearing.

(3) Make sure that the failsafe hook nuts (144) are hand tight only.

(4) For the flap track 3:

(a) Use the EXTRACTOR - PIN, TRACK 4 to install the bolt (143) in the
flap carriage.

(b) Remove the EXTRACTOR - PIN, TRACK 4 from the bolt (143).

(5) For the flap track 4:

(a) Use the EXTRACTOR - PIN, TRACK 4 to install the bolt (143) in the
flap carriage.

(b) Remove the EXTRACTOR - PIN, TRACK 4 from the bolt (143).

(6) Install the splined bushes (142) correctly over the bolts (143).

(7) Temporarily install the locking plates (141) and the nuts (136). Make
sure that the nuts (136) are hand tight only.
Subtask 27-54-62-420-077
G. Connect the Flap Drive Arms to the Rotary Actuator Drive-Levers
(Ref. Fig. 402/TASK 27-54-62-991-009)
(1) Hold the trailing edge of the outboard flap and remove the hoisting
sling from the outboard flap (Ref. TASK 27-50-00-000-002).
(2) Manually push the flap forward until the flap drive arms are engaged
with the rotary actuator drive-levers.
(3) Install the bolts (55), the washers (56) and the nuts (57). Do not
torque the nuts (57) at this stage.



EFF :
ALL
 27-54-62



AIJ




Page 422
May 01/09

Subtask 27-54-62-860-059
H. Lower the Spoilers
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the applicable
torque shaft.
(2) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
slowly retract the flaps to the fully retracted position (Ref. TASK
27-50-00-866-011).
(3) Lower the applicable spoilers 2, 3, 4 and 5 (Ref. TASK 27-60-00-866002).
NOTE : The spoilers may rest on the upper surfaces of the flaps.
____
(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is on the
applicable torque shaft.
Subtask 27-54-62-820-076
J. Check and Adjustment of the Outboard Flap Rigged Position
NOTE : Before you do the rigging procedure, make sure that:
____
- the aircraft weight is on the landing gear or on jacks
- the No 1 and the No 2 engines are installed or not installed
- the fuel load is symmetrical or the wing tanks are empty
- the flaps are fully retracted (Ref. TASK 27-50-00-866-012).
(1) Install the sharks fin flap rigging tools and do a check of the
outboard flap rigged position (Ref. TASK 27-51-00-820-003).
(2) If the flap rigged position is not correct, adjust as necessary until
the flap is in the specified limits (Ref. TASK 27-51-00-820-008),
(Ref. TASK 27-54-62-000-001) and (Ref. TASK 27-54-62-400-001).
R

Subtask 27-54-62-420-098-A

R
R

K. Complete the Connection of the Flap Drive Arms to the Rotary Actuator
Drive-Levers

R
R

(1) TORQUE the nuts (57) to between 1.8 and 2.2 m.daN (13.27 and 16.22
lbf.ft).

(2) Safety the nuts (57) with the new cotter pins (58).



EFF :
ALL
 27-54-62



AIJ




Page 423
May 01/10

Subtask 27-54-62-420-084
L. Safety the Flap to the Flap Carriage Connections
(Ref. Fig. 403/TASK 27-54-62-991-010)
(1) Make sure that the failsafe hook nuts (144) are hand tight only.
(2) Remove the nuts (136).
(3) Make sure that the spherical bearings, the splined bushes (142) and
the locking plates (141) are engaged correctly.
(4) Install the new crushable spacers (138) and the nuts (136).
(5) TORQUE the nuts (136) to between 15 and 20 m.daN (110.61 and 147.49
lbf.ft).
(6) Safety the nuts (136) with the new cotter pins (137).
(7) Install the washers (140) and the nuts (139).
Subtask 27-54-62-420-081
M. Safety the Forward Eccentrics
(Ref. Fig. 407/TASK 27-54-62-991-003)
(1) If the forward eccentrics have been adjusted, do the steps that
follow:
(a) Install the serrated plate (152) on the eccentric bolt (156) at
track 3.
(b) Install the bolt (151), the washer (153) and the nut (154).
(c) Tighten the nut (154) and safety with a new cotter pin (155).
(d) Install the serrated plate (159) on the eccentric bolt (160) at
track 4.
(e) Install the bolt (157) and the washer (158).
(2) Make sure that the outboard flap trailing edge is still in the
correct rigged position (Ref. TASK 27-51-00-820-003).



EFF :
ALL
 27-54-62


R 
AIJ




Page 424
May 01/09

R
R

Flap Forward Eccentrics - Location and Detail


Figure 407/TASK 27-54-62-991-003



EFF :
ALL
 27-54-62



AIJ




Page 425
Feb 01/07

Subtask 27-54-62-916-054
N. Application of Special Materials
(Ref. Fig. 407/TASK 27-54-62-991-003)

(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:


- the cotter pin (155), the nut (154), the washer (153), the bolt
(151) and the nut on the eccentric bolt (156)
- the bolt (157), the washer (158) and the nut on the eccentric bolt
(160).
Subtask 27-54-62-420-078
P. Continue to Safety the Flap to the Flap Carriage Connections.
(Ref. Fig. 403/TASK 27-54-62-991-010)

(1) TORQUE the failsafe hook nuts (145) to 0.12 m.daN (10.61 lbf.in)
maximum.
(2) Safety the failsafe hook nuts (145) with MISCELLANEOUS (Material No.
19-010).
Subtask 27-54-62-820-052
Q. Adjustment of the Blade Seal and Cruise Roller
(1) Set the flap outboard end blade-seal.
(Ref. Fig. 405/TASK 27-54-62-991-016)

(a) Make sure that the dimension B is 33.4 mm (1.34 in.) +/- 6 mm
(0.24 in.).
(b) Loosen the screws (126).
(c) Adjust the blade-seal (124) until the dimension C is 8 mm (0.35
in.).
(d) Tighten the screws (126) so that the blade-seal (124) is
compressed but not out of shape.
(e) Apply a bead of the SEALANTS (Material No. 09-002) between the
cap strip (125) and the outboard flap structure.



EFF :
ALL
 27-54-62



AIJ




Page 426
Feb 01/07

(2) Measure and if necessary, adjust the inboard cruise roller.


(Ref. Fig. 406/TASK 27-54-62-991-013)

(a) Measure the dimension Y:


1
_

If the dimension Y is between zero and 2 mm (0.08 in.), the


position of the cruise roller is correct.

2
_

If the dimension Y is more than 2 mm (0.08 in.), you must


adjust the inboard cruise roller.

(3) To adjust the inboard cruise roller:


(a) Remove the nut (98), the collar (97) and the serrated plate (99).
(b) Turn the eccentric (100) until the dimension Y is correct.
(c) Install the serrated plate (99) to lock the eccentric (100).
(d) Install the collar (97) and the nut (98).
(e) TORQUE the nut (98) to between 2.4 and 2.7 m.daN (17.69 and 19.91
lbf.ft).
(f) Do a check of the dimension Y again.
(4) If the flap guide-roller assembly was removed, install it (Ref. TASK
27-54-63-400-001).
Subtask 27-54-62-220-054
R. Measurement and Adjustment of the Flap Guide-Roller Assembly
(Ref. Fig. 408/TASK 27-54-62-991-017)

(1) Measure and if necessary, adjust the flap guide-roller assembly.


(a) Measure the dimension D:
1
_

If the dimension D is more than 3 mm (0.12 in.), replace the


flap guide-roller assembly with one of the correct size
(Ref. TASK 27-54-63-400-001).

2
_

If the dimension D is less than 3 mm (0.12 in.) or there is no


clearance, (and the flap guide roller assembly turns freely),
the clearance is correct.



EFF :
ALL
 27-54-62



AIJ




Page 427
Feb 01/07

R
R

Center Cruise Roller Alignment


Figure 408/TASK 27-54-62-991-017



EFF :
ALL
 27-54-62



AIJ




Page 428
Feb 01/07

Subtask 27-54-62-220-055
S. Measure the Spoiler to Outboard Flap Clearance
(1) Do a check of the clearance between the spoiler 2 trailing edge and
the top surface of the outboard flap (Ref. TASK 27-64-00-820-001).
(2) Do the procedure again for each of the spoilers 3, 4 and 5 (Ref. TASK
27-64-00-820-001).
Subtask 27-54-62-420-079
T. Installation of the Interconnecting Strut
(1) Install the interconnecting strut (1) (Ref. TASK 27-51-44-400-001).
Subtask 27-54-62-420-082
U. Not applicable.
Subtask 27-54-62-916-051
V. Application of Special Materials
(Ref. Fig. 402/TASK 27-54-62-991-009, 403/TASK 27-54-62-991-010, 406/TASK
27-54-62-991-013)
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the bolts (55), the washers (56), the nuts (57) and the cotter pins
(58)
- the nut (136), the cotter pin (137), the nut (139), the washer
(140) and the bolt (143)
- the nut (98).
Subtask 27-54-62-420-080
R

W. Flap Installation Procedure - Continued


(1) Manually fully retract the flaps (Ref. TASK 27-50-00-866-012).
(2) Connect the bonding straps.
(Ref. Fig. 402/TASK 27-54-62-991-009)
(a) Attach the bonding straps (49) from the flap track carriages to
the flap brackets with the washers (50) and the bolts (51)
(Ref. TASK 20-28-00-912-004).
(b) Attach the bonding strap (53) from the outboard flap to the
inboard flap bracket with the nut (54) and the bolt (52)
(Ref. TASK 20-28-00-912-004).
(3) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.



EFF :
ALL
 27-54-62



AIJ




Page 429
Nov 01/10

(4) Install the flap kink seals (Ref. TASK 27-54-61-400-006).


R
R
R

(5) If the flap track No. 3 and 4 movable fairings were lowered for
access at flap removal, lift the flap track No. 3 and No. 4 movable
fairings (Ref. TASK 57-55-11-410-002).
Subtask 27-54-62-865-052
X. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
Subtask 27-54-62-710-050
Y. Test
(1) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Do an operational test of the spoiler system (Ref. TASK 27-64-00-710001).
5. Close-up
________
Subtask 27-54-62-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) If the flap track No. 3 and No. 4 movable fairings were removed at
flap removal, install the flap track No. 3 and No. 4 movable fairings
(Ref. TASK 57-55-11-400-001).



EFF :
ALL
 27-54-62



AIJ




Page 430
Nov 01/10

(3) Install the access panels:


(a) For the LH wing,
- install 573CB (Ref. TASK 57-51-37-400-002)
- install 575AB, 575BB (Ref. TASK 57-51-37-400-004).
(b) For the RH wing,
- install 673CB (Ref. TASK 57-51-37-400-002)
- install 675AB, 675BB (Ref. TASK 57-51-37-400-004).
Subtask 27-54-62-942-050
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-62


R 
AIJ




Page 431
Feb 01/07

TASK 27-54-62-000-003
Removal of the Leading Edge Panels 2 and 5 on the Outboard Flap
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
To get visual access for internal structure.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


plastic spatula
safety barriers
warning notice
access platform 3 m (9 ft. 10 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008
CMM 575321
27-54-62-991-031

Extension of the Flaps on the Ground


Fig. 409



EFF :
ALL
 27-54-62



AIJ




Page 432
Feb 01/07

3. __________
Job Set-up
Subtask 27-54-62-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice on the HYD section of the panel 430VU to tell
persons not to pressurize the aircraft hydraulic system.
(3) Put a warning notice in position to tell persons not to operate the
flight controls.
(4) Put the access platform in position below the applicable flap.
Subtask 27-54-62-860-057
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
Subtask 27-54-62-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-62



AIJ




Page 433
Aug 01/07

4. Procedure
_________
R

(Ref. Fig. 409/TASK 27-54-62-991-031)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-62-020-055
A. Removal of the Leading Edge Panels 2 and 5 on the Outboard Flap
NOTE : The leading edge panel 2 is attached to the outboard flap with
____
rivets. Remove the leading edge panel 2 on the outboard flap (Ref.
CMM 575321).
(1) Use a plastic spatula to remove the sealant between the leading edge
panel 5 (2) and the outboard flap.
(2) Remove the screws (1) and carefully remove the leading edge panel 5
(2) from the flap.



EFF :
ALL
 27-54-62



AIJ




Page 434
Feb 01/07

R
R

Leading Edge Panels 2 and 5 on the Outboard Flap - Location and Detail
Figure 409/TASK 27-54-62-991-031



EFF :
ALL
 27-54-62



AIJ




Page 435
Feb 01/07

TASK 27-54-62-400-003
Installation of the Leading Edge Panels 2 and 5 on the Outboard Flap
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27803000000

safety barriers
warning notice
warning notices
access platform 3.0 m (9 ft. 10 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-54-62



AIJ




Page 436
Aug 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-012
Material No. 09-016
Material No. 11-026
Material No. 19-003

USA VV-P-236
PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II
CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008
27-50-00-866-009
CMM 575321
27-54-62-991-031

Extension of the Flaps on the Ground


Retraction of the Flaps on the Ground
Fig. 409

3. __________
Job Set-up
Subtask 27-54-62-941-062
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notices is in position to tell persons not
to pressurize the hydraulic system.
(3) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.



EFF :
ALL
 27-54-62



AIJ




Page 437
Feb 01/07

Subtask 27-54-62-860-063
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are extended fully (Ref. TASK 27-50-00-866008).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITIONis
installed on the flap/slat control lever.
(3) Make sure that the access platform is below the applicable flap.
4. Procedure
_________
(Ref. Fig. 409/TASK 27-54-62-991-031)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-62-420-097
A. Preparation for Installation
(1) Do an inspection of the component interface and/or the adjacent area.
(2) Clean the interface of the leading edge panel (2) and the outboard
flap with a MISCELLANEOUS (Material No. 19-003) made moist with
CLEANING AGENTS (Material No. 11-026).
Subtask 27-54-62-420-066
B. Installation of the Leading Edge Panels 2 and 5 on the Outboard Flap
NOTE : The leading edge panel 2 is attached to the outboard flap with
____
rivets. Install the leading edge panel 2 on the outboard flap
(Ref. CMM 575321).
(1) Apply a layer of SEALANTS (Material No. 09-016) to the interface of
the leading edge panel 5 (2) and the outboard flap.



EFF :
ALL
 27-54-62



AIJ




Page 438
Aug 01/07

(2) Apply a layer of COMMON GREASE (Material No. 04-012) to the contact
areas of the leading edge panel 5 (2).
(3) Install the leading edge panel 5 (2) with the screws (1).
(4) Clean the groove between the leading edge panel 5 (2) and the
outboard flap with CLEANING AGENTS (Material No. 11-026).
(5) Seal the groove between the leading edge panel 5 (2) and the outboard
flap with SEALANTS (Material No. 09-016).
5. Close-up
________
Subtask 27-54-62-865-058
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-62-860-062
B. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-54-62-942-054
C. Removal of Equipment
(1) Remove the safety barriers
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-62



AIJ




Page 439
Aug 01/07

OUTBOARD FLAP - INSPECTION/CHECK


________________________________
R

TASK 27-54-62-220-001
Dimensional Check of the Joints that connect the Flap Actuator Levers to the
Flap Drive Struts (Tracks 3 and 4)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement of the outboard flap is more than that in TASK
27-54-00-200-003.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
access platform 2 m (6 ft. 7 in.)



EFF :
ALL
 27-54-62



AIJ




Page 601
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-54-55-000-002
27-54-55-000-003
27-54-55-400-002
27-54-55-400-003
R

27-54-62-991-046

Removal of the Flap-Actuator Lever Assembly - Track 3


Removal of the Flap-Actuator Lever Assembly - Track 4
Installation of the Flap-Actuator Lever Assembly Track 3
Installation of the Flap-Actuator Lever Assembly Track 4
Fig. 601

3. __________
Job Set-up
Subtask 27-54-62-941-064
A. Safety Precautions
(1) Put a warning notice on the flap/slat control lever (panel 114VU) to
tell persons not to operate the flaps.
(2) Put the safety barriers in position.
Subtask 27-54-62-010-056
B. Get Access
Put the access platform in position below the applicable zone 575 or 675.
(1) Disconnect the joints at tracks 3 and 4 that connect the actuator
levers to the drive struts (Ref. TASK 27-54-55-000-002) and
(Ref. TASK 27-54-55-000-003).
4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-54-62-991-046)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-62



AIJ




Page 602
Feb 01/07

R
R

Outboard Flap - Fits and Clearances (Tracks 3 and 4)


Figure 601/TASK 27-54-62-991-046



EFF :
ALL
 27-54-62



AIJ




Page 603
Feb 01/07

Subtask 27-54-62-220-065
A. Dimensions of the Joint that Connect the Actuator Lever to the Drive
Strut (Tracks 3 and 4).
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.841 | 15.859 |
|
| 15.807 |
|
|
| OD 1
|(0.6236) |(0.6243) |
|
|(0.6223) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.120 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0047)|
| A
| 15.875 | 15.893 |
|
|
| 15.927 |
|
| ID 2
|(0.6250) |(0.6257) |
|
|
|(0.6270) |
|
------------------------------------------------------------------------------Subtask 27-54-62-220-066
B. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Tracks 3 and 4).
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.841 | 15.859 |
|
| 15.822 |
|
|
| OD 1
|(0.6236) |(0.6243) |
|
|(0.6229) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.072 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0028)|
| A
| 15.862 | 15.875 |
|
|
| 15.894 |
|
| ID 4
|(0.6244) |(0.6250) |
|
|
|(0.6257) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-62


R 
AIJ




Page 604
Feb 01/07

Subtask 27-54-62-220-067
C. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Tracks 3 and 4).
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 15.841 | 15.859 |
|
| 15.781 |
|
|
| OD 1
|(0.6236) |(0.6243) |
|
|(0.6212) |
|
|
|
|
|
| 0.046 | 0.074 |
|
| 0.194 |
|
|
|
| (0.0018)| (0.0029)|
|
|(0.0076)|
| A
| 15.905 | 15.915 |
|
|
| 15.975 |
|
| ID 5
|(0.6261) |(0.6265) |
|
|
|(0.6289) |
|
------------------------------------------------------------------------------Subtask 27-54-62-220-068
D. Dimensions of the Joint that Connects the Actuator Lever to the Drive
Strut (Tracks 3 and 4).
(1) Do a check of the dimensions that follow:
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| A
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 2
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| A
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 3
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-54-62


R 
AIJ




Page 605
Feb 01/07

Subtask 27-54-62-220-069
E. Not applicable.
Subtask 27-54-62-220-070
F. Not applcable.
Subtask 27-54-62-220-071
G. Not applcable.
5. Close-up
________
Subtask 27-54-62-410-059
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Connect the joints at tracks 3 and 4 to connect the actuator levers
to the drive struts (Ref. TASK 27-54-55-400-002) and (Ref. TASK 2754-55-400-003).
Subtask 27-54-62-942-058
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-62


R 
AIJ




Page 606
Feb 01/07

ROLLER ASSY - FLAP GUIDE - REMOVAL/INSTALLATION


_______________________________________________
R

TASK 27-54-63-000-001
Removal of the Flap Guide-Roller Assembly
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27504005000
98D27604000000
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
1 PIN RIGGING-FLAPS (TRACK 1)
1 COLLAR-SAFETY, SPOILER
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-54-63



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-60-00-866-002
57-51-37-000-004
R

27-54-63-991-001

Retraction of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-54-63-991-001)


Subtask 27-54-63-941-052
A. Safety Precautions
(1) Put a warning notice in position to tell persons not to operate the
flight controls.
(2) Put the safety barriers in position.
Subtask 27-54-63-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat lever on panel 114VU.



EFF :
ALL
 27-54-63



AIJ




Page 402
Feb 01/07

R
R

Flap Guide - Roller Assembly


Figure 401/TASK 27-54-63-991-001



EFF :
ALL
 27-54-63



AIJ




Page 403
Feb 01/07

Subtask 27-54-63-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-54-63-480-050
D. Install Support Equipment
(1) Install the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) in the track
1 flap drive-levers.
Subtask 27-54-63-010-050
E. Get Access
(1) Put the access platform in position:
- for the LH wing, below zone 580
- for the RH wing, below zone 680.
(2) Put the spoilers 3 and 4 in the M (Maintenance) position (Ref. TASK
27-60-00-866-002).
(3) Put a COLLAR-SAFETY, SPOILER on the piston rod of each servo-control.
(4) Remove the applicable access panels (Ref. TASK 57-51-37-000-004):
- for the left wing 575CB, 575GB
- for the right wing 675CB, 675GB.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-54-63-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-54-63



AIJ




Page 404
Feb 01/07

Subtask 27-54-63-020-050
A. Removal of the Flap Guide-Roller Assembly
(1) Remove and discard the cotter pin (1).
(2) Remove the nut (2) and the bolt (3).
(3) Remove the roller assembly (5).



EFF :
ALL
 27-54-63


R 
AIJ




Page 405
Feb 01/07

TASK 27-54-63-400-001
Installation of the Flap Guide-Roller Assembly
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27604000000

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 COLLAR-SAFETY, SPOILER



EFF :
ALL
 27-54-63



AIJ




Page 406
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
R
R

Material No. 11-026


Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1

cotter pin

27-54-05 42A-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-60-00-866-002
57-51-37-000-004
57-51-37-400-004
27-54-63-991-001

Retraction of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

3. __________
Job Set-up
Subtask 27-54-63-941-053
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the flight controls.



EFF :
ALL
 27-54-63



AIJ




Page 407
Aug 01/11

Subtask 27-54-63-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the flaps are fully retracted (Ref. TASK 27-50-00-866009).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever on panel 114VU.
(3) Make sure that the access platform is in position:
- for the LH wing, below zone 580
- for the RH wing, below zone 680.
(4) Make sure that the spoilers 3 and 4 are in the M (Maintenance)
position (Ref. TASK 27-60-00-866-002).
(5) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
(6) Make sure that the applicable access panels are removed (Ref. TASK
57-51-37-000-004):
- for the left wing, panels 575CB, 575GB
- for the right wing, panels 675CB, 675GB.
Subtask 27-54-63-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-54-63


R 
AIJ




Page 408
Aug 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-63-991-001)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-54-63-420-051
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Do an inspection of the component interface and/or the adjacent area.


(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Clean the parts:
(a) Clean the interface of the bolt (3) and the bush (4) with a clean
MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS (Material
No. 11-026).

R
R

(5) Apply a thin layer of SEALANTS (Material No. 09-018) to the interface
of the bolt (3) and the bush (4).



EFF :
ALL
 27-54-63



AIJ




Page 409
Aug 01/11

Subtask 27-54-63-420-050
B. Installation of the Flap Guide-Roller Assembly
(1) Install the correct size of roller assembly (5) so that the dimension
X is not more than 3 mm (0.12 in.).
NOTE : If the dimension X is very small the roller assembly must
____
still be able to turn freely.
(2) Install the bolt (3) and the nut (2).
(3) TORQUE the nut (2) to between 1.40 and 2.70 m.daN (10.32 and 19.91
lbf.ft).
(4) Install the new cotter pin (1).
(5) Make sure that the roller assembly (5) can turn freely.
5. Close-up
________
Subtask 27-54-63-080-050
A. Remove the Support Equipment
(1) Remove the PIN RIGGING-FLAPS (TRACK 1) from the track 1 flap
drive-levers.
Subtask 27-54-63-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels (Ref. TASK 57-51-37-400-004):
- for the left wing 575CB, 575GB
- for the left wing 675CB, 675GB.
(3) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(4) Put the spoilers 3 and 4 in the O (Operation) position (Ref. TASK
27-60-00-866-002).
(5) On the servo-control, make sure that the pointer on the hex-head is
opposite the letter O (Operation) on the housing.



EFF :
ALL
 27-54-63


R 
AIJ




Page 410
Aug 01/11

(6) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever on panel 114VU.
Subtask 27-54-63-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV.
Subtask 27-54-63-942-050
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-54-63


R 
AIJ




Page 411
Aug 01/11

FLAPS POSITION INDICATING - DESCRIPTION AND OPERATION


_____________________________________________________
1. General
_______
The upper display unit of the Electronic Centralized Aircraft Monitoring
(ECAM) system shows the flap position. The display unit shows the flap
position together with the slat position and the direction of their
movement. A full description of the slat position indicating data is given
in (Ref. 27-85-00).
The Instrumentation Position Pick-Off Unit (IPPU) 3CN monitors the movement
of the mechanical transmission system. It thus monitors the operation and
position of the flaps.
2. __________________
Component Location
(Ref. Fig. 001)
------------------------------------------------------------------------------FIN
I
FUNCTIONAL DESIGNATION
I PANELIZONEIACCESS I
ATA
I
I
I
I DOOR I
REF.
------------------------------------------------------------------------------6201CM
POWER CONTROL UNIT
147 734
27-54-51
3CN
INSTRUMENTATION POSITION PICK-OFF
147/ 734/
27-55-11
UNIT (IPPU)
148 744
3. __________________
System Description
(Ref. Fig. 002, 003)
The IPPU is attached to the flap Power Control Unit (PCU). An intermediate
gear transmits the movement from the output shaft of the differential
gearbox to the IPPU. The IPPU sends the flap position data to the Flight
Warning Computers (FWC1, FWC2) (Ref. 31-53-00). The FWCs send the data to
the Electronic Instrument System (EIS). The EIS shows the position of the
flaps on the upper display unit of the ECAM system.
The upper display unit uses the shape of
positions. A grey symbol shows the fixed
indications show the correct position of
and flaps are fully retracted, the green
of the center section of the wing.

a wing to show the slat and flap


center section of the wing. Green
the slats and flaps. When the slats
symbols are shown on the two sides



EFF :
ALL
 27-55-00



AIJ




Page 1
Feb 01/07

Equipment on Flap Power Control-Unit - Component Location


Figure 001


EFF :
ALL
 27-55-00



AIJ




Page 2
Feb 01/07

Indication of the Flap Positions


Figure 002


EFF :
ALL
 27-55-00



AIJ




Page 3
Feb 01/07

Flap Position Indicating - Schematic


Figure 003


EFF :
ALL
 27-55-00



AIJ




Page 4
Feb 01/07

White points show the position of the flaps on the display. The white points
are not shown when the flaps and slats are fully retracted (clean
configuration). The indication F, which is usually white, shows the flap
part of the display. The indication is not shown when the aircraft is in the
clean configuration.
The upper display unit also shows:
- the position of the flap and slat control lever
- the position of the flap surfaces
- the direction and limit of the flap surface movement
- when the flap locking function is engaged
- when the flap auto-command function is engaged
- when a system failure has occurred.
4. ____________
Power Supply
(Ref. Fig. 003)
The 431XP ESS BUS and the 231XP Bus 2 supply 26V AC:
- 431XP ESS BUS supplies circuit breaker 1CN
- 231XP BUS 2 supplies circuit breaker 2CN
- 1CN supplies 26V AC to IPPU connector A
- 2CN supplies 26V AC to IPPU connector B.
5. Interface
_________
Not Applicable
6. _____________________
Component Description
A. Instrumentation Position Pickoff-Unit (IPPU)
The IPPU has:
- a splined input shaft
- a spring-loaded locking plate
- reduction gears
- a reduction gear housing
- two synchro transmitters which operate independently
- a synchro cover
- an electrical connector assembly
- a cover plate.



EFF :
ALL
 27-55-00


R 
AIJ




Page 5
Feb 01/07

When the IPPU is removed, the spring-loaded locking plate holds the
splined input shaft from the removed IPPU. When the IPPU is installed,
the mount of the IPPU pushes the locking plate away from the shaft
splines. The input shaft moves the reduction gears which are in the
reduction gear housing. The reduction gears turn the two synchro
transmitters which are below the synchro cover.
The electrical connector assembly is installed on the reduction gear
housing. The electrical connector assembly has two connectors, one for
each synchro transmitter. The connectors are identified as A and B. The
cover plate is installed over an opening in the reduction gear housing.
There is a window in the cover plate to monitor adjustment of the IPPU to
zero.
The IPPU is the same as the Feedback Position Pick-Off Unit (FPPU) and a
full description is given in (Ref. 27-51-00).
7. ________________________________
Operation/Control and Indicating
(Ref. Fig. 002, 003)
When the flaps move, the upper display unit (Ref. 31-66-00) shows:
- the F indication in white
- the position indication of the flap and slat control lever as 0, 1 (1 + F
when the flap auto-command function is engaged), 2, 3 or FULL in cyan
- the flap symbol in green
- a cyan symbol below the related white point of the new flap position
selection.
When the flaps reach their new position:
- the flap symbol is shown around the related white point
- the position indication of the flap and slat control lever changes from
cyan to green.
- the cyan symbol below the related white point goes out of view.
If the flaps do not move to the correct position:
- the F indication changes from white to amber
- the flap symbol changes from green to amber
- the position indication of the flap and slat control lever stays cyan
- the cyan symbol stays below the related white point of the flap position
selection.



EFF :
ALL
 27-55-00



AIJ




Page 6
Feb 01/07

A. Flap Protection
(1) Flap Lock
If the Wing Tip Brakes (WTB) lock the flap transmission system (e.g.
in an asymmetry condition (Ref. 27-51-00)):
- the white F indication changes to amber
- the flap symbol changes to amber
- the position indication of the flap and slat control lever stays
cyan
- the cyan symbol stays below the related white point of the flap
position selection.
- an amber F LOCKED message comes on above the F indication.
(2) System Failure
If the SFCCs send a failure message to the EIS, or the System Data
Acquisition Concentrators (SDAC1, SDAC2) (Ref. 31-54-00) send a SFCC
failure message:
- the white F indication changes to amber
- the flap symbol changes from green to amber.
B. No Data at the Data Management Computer (DMC) Input
(1) No Position Data
When no valid position data is available for the flaps at the DMC
input:
- the flap position symbol goes out
- the white points showing the flap positions go out
- two amber crosses come on at the flap side of the display
- the position indication of the flap and slat control lever changes
from green to cyan.
(2) No Configuration Indication
When no valid configuration data is available from the DMC, two amber
crosses replace the lever position indicator.
8. Bite
____
Not Applicable



EFF :
ALL
 27-55-00



AIJ




Page 7
Feb 01/07

POSITION PICK-OFF UNIT - INSTRUMENTATION (IPPU) (3CN) - REMOVAL/INSTALLATION


____________________________________________________________________________
TASK 27-55-11-000-001
Removal of the Instrumentation Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

blanking caps
circuit breaker(s) safety clip(s)
tie-wrap
1 ACCESS PLATFORM 3M (10 FT)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
32-12-00-010-001
27-55-11-991-001

Retraction of the Flaps on the Ground


Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-55-11-010-050
A. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-55-11



AIJ




Page 401
Feb 01/11

Subtask 27-55-11-860-050
B. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT) in position at the opening of the
main door of the main gear.
(2) Make sure that the flaps are in the fully retracted position
(Ref. TASK 27-50-00-866-009).
Subtask 27-55-11-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-55-11-991-001)
Subtask 27-55-11-020-050
A. Removal of the Instrumentation Pick-Off Unit
NOTE : Do not remove the Instrumentation Position Pick-off Unit when the
____
Pressure-off Brakes are removed from the Power Control Unit.
(1) Remove the electrical connectors 3CN-A and 3CN-B from the
Instrumentation Position Pick-off Unit (IPPU).
(2) Put blanking caps on the disconnected electrical connector(s).
(3) Remove the screws (1) and the washers (2).
(4) Remove the IPPU carefully from the gearbox.
(5) Put a tie-wrap (3) behind the locking plate to prevent the retraction
of the locking plate.



EFF :
ALL
 27-55-11



AIJ




Page 402
Feb 01/11

R
R

Instrumentation Position Pick-Off Unit


Figure 401/TASK 27-55-11-991-001



EFF :
ALL
 27-55-11



AIJ




Page 403
Feb 01/07

TASK 27-55-11-400-001
Installation of the Instrumentation Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)


Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


ZINC POWDER (Ref. 20-31-00)



EFF :
ALL
 27-55-11



AIJ




Page 404
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-009
27-54-00-710-001
32-12-00-010-001
32-12-00-410-001
34-13-00-710-007
27-55-11-991-001

Retraction of the Flaps on the Ground


Operational Test of the Flap System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Operational Test of the Overspeed Warnings in the
Slats/Flaps and Landing Gear Extended (VFE/VLE)
Configuration
Fig. 401

3. __________
Job Set-up
Subtask 27-55-11-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
R

(2) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the
opening of the main door of the main gear.
(3) Make sure that the flaps are in the retracted position (Ref. TASK 2750-00-866-009) because a new IPPU is delivered locked in its zero
position.
Subtask 27-55-11-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-55-11



AIJ




Page 405
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-55-11-991-001)


Subtask 27-55-11-860-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Remove the sealing compound from the flange of the replacement IPPU.
(4) Clean the anodic contact areas on the IPPU and the gearbox.
(5) Coat the areas with a mixture of SPECIAL MATERIALS (Material No. 05002) and SPECIAL MATERIALS (Material No. 05-054) in the ratio of 58
to 42 by weight.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
screws (1).
Subtask 27-55-11-420-050
B. Installation of the Instrumentation Position Pick-Off Unit
(1) Make sure that all zero marks on the IPPU are aligned.
(2) Remove the blanking caps and the tie-wrap (3).
(3) Install the IPPU carefully on the gearbox.
(4) Install the screws (1) and the washers (2).
(5) TORQUE the screws (1) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).



EFF :
ALL
 27-55-11



AIJ




Page 406
Feb 01/07

(6) Do a bonding test between the main bonding point of the power control
unit and the IPPU flange. The resistance must not be more than 20
milliohms.
(7) Remove the blanking caps from the electrical connectors.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(9) Connect the electrical connectors 3CN-A and 3CN-B to the IPPU.
Subtask 27-55-11-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 1CN, 2CN
Subtask 27-55-11-710-050
D. Operational Tests
(1) Do the operational test of the flap system (Ref. TASK 27-54-00-710001).
(2) Do the operational test of the overspeed warnings in the slats/flaps
and landing gear extended (VFE/VLE) configuration (Ref. TASK 34-1300-710-007).
5. Close-up
________
Subtask 27-55-11-410-050
A. Close Access
(1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-55-11


R 
AIJ




Page 407
Feb 01/07

SPOILER - DESCRIPTION AND OPERATION


___________________________________
1. _______
General
Five spoilers numbered 1 thru 5 inboard to outboard are provided on the rear
upper surface of each wing.
The spoilers are used for:
- Roll function
- Speedbrake function
- Ground spoilers function
Each spoiler is electrically controled (Ref 27-90) and Hydraulically
actuated by an electrohydraulic servocontrol (Ref 27-64).
They are two type of servocontrol with different overhaull (Ref 27-64):
- The inboard type for spoilers 1,2 and 3.
- The outboard type for spoilers 4 and 5.
Three Spoiler Elevator Computer (SEC) (Ref 27-94) elaborate the surface
deflection order.
The spoilers 1 and 2 are associated with SEC 3.
The spoilers 3 and 4 are associated with SEC 1.
The spoiler 5 is associated with SEC 2.
Each SEC is organized around two channel:
- Command channel
- Monitor channel
The Command channel receives analog sensor data,Arinc data and discrete
signals in order to generate the flight commands used to drive the
correspondant servo control.
The Monitor channel receives independently the sensor information required
to compute the control law.
Each SEC is also connected to two Flight Concentrator Data Computer (FCDC)
(Ref 27-95).
The FCDC serves as an interface between the SECs and; Display System and
Warning (EIS Ref 31-60,FWC Ref 31-53),Maintenance System (CFDS Ref 31-30),
Recording System (FDIU,DFDR,QAR Ref 31-33).
The position of all spoilers and other surface are indicated on the lower
ECAM Display Unit (Ref 31-64) via the FCDC.
2. __________________
System Description
R

A. Roll Function
(Law ref 27-90, Spoilers Slaving and Monitoring Ref 27-94)
The spoilers 2 thru 5 assist the ailerons in roll control.
The Roll axis is controlled and monitored by the three SECs associated
with ailerons.
The SECs compute the surface deflection orders:
In manual control mode, mainly from the side sticks (Ref 27-92)
In autopilot mode from the FMGS (Ref 22-10).

R
R
R



EFF :
ALL
 27-60-00



AIJ




Page 1
Aug 01/08

B. Speedbrake Function
(Ref. Fig. 001)
(Law Ref 27-90, Spoilers Slaving and Monitoring Ref 27-94)
The speedbrake function is controlled and monitored by the three SECs
with spoilers 2, 3 and 4.
The speedbrake lever controls the position of these spoilers and so is
used for the preselection of ground spoilers function.

R
R

R
R

(1) The speedbrake lever positions and the equivalent angles are given in
the following table:

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
LEVER POSITION
|
SPEEDBRAKE ANGLE (deg)
|
|----------------------------------|------------------------------------------|
|
ARMED
|
-3
|
|
RET
|
0
|
|
1/2
|
+28.5
|
|
FULL
|
+57
|
------------------------------------------------------------------------------C. Ground Spoilers
(Ref. Fig. 002)
(Law Ref 27-90, Spoilers Slaving and Monitoring Ref 27-94)
The ground spoilers function is ensured by all spoilers.
The activation of this function is dependent upon:
- The function preselection (given by speedbrake lever position)
- The two engines at idle
- Flight/Ground transition (With Ground and wheel speed information).



EFF :
ALL
 27-60-00



AIJ




Page 2
Aug 01/08

Speedbrake Function - Block Diagram


Figure 001

EFF :
ALL
 27-60-00




AIJ




Page 3/4
Feb 01/07

Ground Spoilers - Block Diagram


Figure 002

EFF :
ALL
 27-60-00




AIJ




Page 5/6
Feb 01/07

SPOILER - MAINTENANCE PRACTICES


_______________________________
TASK 27-60-00-866-002
Extension-Retraction of the Spoilers for Maintenance
NOTE : The procedure is the same for all spoilers
____
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R
R

No specific
No specific
No specific
98D27603002000
98D27603002001
98D27604000000
98D27803000000

1
1
1
1
1
1

metal rod (tommy bar) dia. 4 mm (0.1574 in.)


ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
KEY-SPOILER MAINTENANCE
KEY-SPOILER MAINTENANCE
COLLAR-SAFETY, SPOILER
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-080-002
27-50-00-866-008
27-50-00-866-009
27-64-00-710-001
27-80-00-866-004
27-60-00-991-003

Removal of the Flap/Slat Control-Lever Locking Tool


(98D27803000000)
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Spoiler Hydraulic Actuation
Extending the Slats on the Ground
Fig. 201



EFF :
ALL
 27-60-00



AIJ




Page 201
Feb 01/11

3. __________
Job Set-up
Subtask 27-60-00-860-050
A. Aircraft Maintenance Configuration
(1) Extend the slats and flaps (Ref. TASK 27-50-00-866-008) (Ref. TASK
27-80-00-866-004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is in position on the flap/slat control lever
(3) Put the warning notice on the HYD section of the panel 40VU to tell
persons not to pressurize the aircraft hydraulic systems.
Subtask 27-60-00-010-051
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.

(4) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position :


(a) at the zone 580 for the left spoilers.
(b) at the zone 680 for the right spoilers.
(5) Open these access doors:
(a) 573BB for the left spoiler 1.
(b) 575BB for the left spoiler 2.
(c) 575DB for the left spoiler 3.
(d) 575EB for the left spoiler 4.
(e) 575GB for the left spoiler 5.
(f) 673BB for the right spoiler 1.
(g) 675BB for the right spoiler 2.



EFF :
ALL
 27-60-00



AIJ




Page 202
Feb 01/11

(h) 675DB for the right spoiler 3.


(i) 675EB for the right spoiler 4.
(j) 675GB for the right spoiler 5.
Subtask 27-60-00-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
Subtask 27-60-00-866-054
A. Extension
(Ref. Fig. 201/TASK 27-60-00-991-003)
R
R
R

(1) Install the KEY-SPOILER MAINTENANCE (98D27603002000) or the KEYSPOILER MAINTENANCE (98D27603002001) (2) on the servocontrol and turn
it a quarter turn counterclockwise.
NOTE: If necessary, use a metal rod (tommy bar) dia. to turn the
spoiler maintenance key.
(2) Move the spoiler to the extended position by hand.
(3) Put the COLLAR-SAFETY, SPOILER (98D27604000000) (3) on the rod (1) of
the servocontrol.
(4) Install the two pins of the safety collar (3).
Subtask 27-60-00-866-056
B. Retraction
(1) Make sure that the warning notice is in position on the panel 40VU to
tell persons not to pressurize the hydraulic systems.

R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is in position on the flap/slat control lever.



EFF :
ALL
 27-60-00



AIJ




Page 203
Nov 01/09

R
R

Spoilers servocontrol
Figure 201/TASK 27-60-00-991-003



EFF :
ALL
 27-60-00



AIJ




Page 204
Feb 01/07

(3) Remove the two pins of the safety collar (3).


(4) Remove the safety collar (3) of the servocontrol.
(5) Move the spoiler to the retracted position with your hand.
R
R
R

(6) Turn the KEY-SPOILER MAINTENANCE (98D27603002000) or the KEY-SPOILER


MAINTENANCE (98D27603002001) (2) a quarter turn clockwise and remove
it.
CAUTION : MAKE SURE THAT NO SPOILER MAINTENANCE KEY STAYS ENGAGED IN
_______
THE MAINTENANCE DEVICE HOUSING. AERODYNAMIC FORCES WILL
CAUSE UNWANTED MOVEMENT OF THE SPOILER IF THE MAINTENANCE
KEY STAYS IN ITS HOUSING.
NOTE: If necessary, use a metal rod (tommy bar) dia. to turn the
spoiler maintenance key.
(7) Make sure that you cannot move the spoiler manually.
5. Close-up
________
Subtask 27-60-00-860-051
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-60-00-710-051
B. Do the operational test of the spoiler hydraulic actuation (Ref. TASK 2764-00-710-001)
Subtask 27-60-00-410-051
C. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Close access door(s) in zone(s) 580, 680.
(5) Remove the access platform(s).



EFF :
ALL
 27-60-00



AIJ




Page 205
Nov 01/09

Subtask 27-60-00-865-054
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
21CE1, 21CE2, 21CE3, 22CE
Subtask 27-60-00-866-055
E. Retraction of the flaps
R
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) from the FLAPS panel 114VU (Ref. TASK 27-00-00-080002).
(2) Retract the flaps (Ref. TASK 27-50-00-866-009)



EFF :
ALL
 27-60-00



AIJ




Page 206
Nov 01/09

SPOILER HYDRAULIC ACTUATION - DESCRIPTION AND OPERATION


_______________________________________________________
1. _______
General
The hydraulic actuation is achieved by one electrohydraulic servocontrol
with asymmetrical chambers, for each spoiler.
2. Component
__________________
Location
(Ref. Fig. 001)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------31CE1
SERVO CTL-SPLR1, L G
574 573BB
27-64-51
31CE2
SERVO CTL-SPLR1, R G
674 673BB
27-64-51
31CE3
SERVO CTL-SPLR2, L Y
583 575BB
27-64-51
31CE4
SERVO CTL-SPLR2, R Y
683 675BB
27-64-51
31CE5
SERVO CTL-SPLR3, L B
584 575DB
27-64-51
31CE6
SERVO CTL-SPLR3, R B
684 675DB
27-64-51
31CE7
SERVO CTL-SPLR4, L Y
584
31CE8
SERVO CTL-SPLR4, R Y
684
31CE9
SERVO CTL-SPLR5, L G
585
31CE10
SERVO CTL-SPLR5, R G
685



EFF :
ALL
 27-64-00



AIJ




Page 1
Feb 01/07

Location of Spoiler Servocontrol


Figure 001


EFF :
ALL
 27-64-00



AIJ




Page 2
Feb 01/07

3. _____________________________
Hydraulic Supply (Ref. 27-00)
R

4. _____________________
Component Description

R
R

A. Servocontrols of Spoilers 1 thru 5


(Ref. Fig. 001)

R
R
R

(1) General
The five fixed body servocontrols (one per spoiler) are
interchangeable.
5. _________
Operation
(Ref. Fig. 002)
A. Normal operation with the servocontrol pressurized
In this case, the high pressure is applied to the bypass valve (3) and to
the plunger (7) which hold the closing valve (6). Thus the two actuator
chambers are connected to the servovalve control lines.
The feedback transducer (11) provides the servoloop feedback.
The servovalve has a biased zero. When the input signal is equivalent to
the electrical zero, its spool valve is open at 25 % of its max. stroke
and connects the supply line of the small chamber to the high pressure.
When the spoiler is at neutral, it is held against the servocontrol stop
by nulling the current of the servovalve.
The servovalve then feeds the high pressure to the small chamber and
applies the piston rod to its internal retraction stop.
B. Operation after an electrical failure
In this case the servovalve input signal is nulled. This biases the
servovalve in order to make the piston rod retract.
C. Operation after a hydraulic failure
When the pressure drops :
- the relief valve (2) moves under the action of its spring. This
isolates the servovalve from the high pressure
- the plunger (7) frees the closing valve (6). This prevents the
extension of the piston rod
- the bypass valve (3) moves rearward under the action of its spring.
This isolates the piston chambers from the servovalve control lines
then the two piston chambers are interconnected in the retraction
direction via the closing valve (6).
The servocontrol can be retracted by external forces.
The calibration valve (4) and the anti-cavitation valve (5) prevent any
low pressure in the small chamber by slowing, down, the transit of the
fluid surplus of the large chamber in the return line.



EFF :
ALL
 27-64-00



AIJ




Page 3
Nov 01/08

Spoiler 1 thru 5 Servocontrol


Figure 002


EFF :
ALL
 27-64-00



AIJ




Page 4
Feb 01/07

D. Operation in case of high pressure decrease


When the HP decreases but remains sufficient to keep the bypass valve in
the active mode, the piston retracts under external forces. These forces
are higher than those delivered by the large chamber pressure. They cause
the servovalve spool valve to open in the direction which connects the
large chamber to the pressure line.
Then the check valve (2) allows to servovalve retraction at low speed as
the fluid transits through the servovalve leakages.
E. Operation on the ground with the servocontrol depressurized
- In the event of a thermal overpressure in the small chamber, the
pressure increasing valve (8) pushes the plunger (7) which causes the
valve (6) to open, and thus the small chamber is unlocked.
- In order to enable ground maintenance operations, the small chamber can
also be unlocked manually by means of the maintenance unlocking
crank-lever (10).
This lever also holds the maintenance pressure-inhibiting valve (9),
thus the control chamber of the bypass valve is connected to the return
line.
This action avoids spoiler movement even if the servocontrol is then
pressurized.
F. Maintenance and rigging facilities
The maintenance is on position.
The items below are line Replaceable Units (LRUs) :
- filter
- servovalve.
The length of the actuator piston rod is adjustable to allow to obtain
the spoiler neutral position when the piston rod is fully retracted.



EFF :
ALL
 27-64-00



AIJ




Page 5
Feb 01/07

SPOILER HYDRAULIC ACTUATION - DEACTIVATION/REACTIVATION


_______________________________________________________
TASK 27-64-00-040-001
Deactivation of the Spoiler Servo Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : DO NOT DO THIS DEACTIVATION PROCEDURE IF THERE IS EXTERNAL LEAKAGE ON
_______
THE UNSERVICEABLE SERVOCONTROL.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-64-0X-A)
Spoilers
(Old MMEL ref: 27-64-01-A))

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27603002000
98D27603002001
98D27803000000
98D27903500000

1
1
1
2

blanking caps
metal rod (tommy bar) dia. 4mm (0.1574in.).
tie-wrap
warning notices
access platform 3.5 m (11 ft. 6 in.)
KEY-SPOILER MAINTENANCE
KEY-SPOILER MAINTENANCE
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-64-00



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-50-00-866-009
27-64-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
R

29-24-00-864-001
27-64-00-991-007

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Spoiler Hydraulic Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-64-00-991-007)


Subtask 27-64-00-860-057
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Extend the flaps (Ref. TASK 27-50-00-866-008).
(3) On the overhead panel 23VU :
- Release the FLT CTL/SEC 1 pushbutton switch (on this pushbutton
switch, the OFF legend comes on).
(4) On the overhead panel 24VU :
- Release the FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on
these pushbutton switches, the OFF legends come on).



EFF :
ALL
 27-64-00



AIJ




Page 402
Feb 01/07

R
R

De-activation and Re-activation of the Servocontrol


Figure 401/TASK 27-64-00-991-007



EFF :
ALL
 27-64-00



AIJ




Page 403
Feb 01/07

R
R

(5) On the panel 114VU, put the LOCKING TOOL-FLAP SLAT LEVER,INT.
POSITION (98D27803000000) in position on the flap and slat control
lever.
(6) Put the PIN-SIDE STICK LOCKING (98D27903500000) in position on each
side-stick controller.
(7) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(8) Depressurize the hydraulic system related to the spoiler that you
must deactivate.
(a) For the spoiler 1 or 5, depressurize the Green hydraulic system
(Ref. TASK 29-23-00-864-001).
(b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-864-001).
(c) For the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(9) Put the access platform in position in :
(a) Zone 580 for the left spoilers.
(b) Zone 680 for the right spoilers.
(10) Open these access doors:
(a) 573BB for the left spoiler 1.
(b) 575BB for the left spoiler 2.
(c) 575DB for the left spoiler 3.
(d) 575EB for the left spoiler 4.
(e) 575GB for the left spoiler 5.
(f) 673BB for the right spoiler 1.
(g) 675BB for the right spoiler 2.
(h) 675DB for the right spoiler 3.
(i) 675EB for the right spoiler 4.



EFF :
ALL
 27-64-00



AIJ




Page 404
Nov 01/09

(j) 675GB for the right spoiler 5.


(11) Before you de-activate a servocontrol, make sure that it has no
external leaks.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-00-991-007)
Subtask 27-64-00-040-052
A. Deactivation of the Spoiler Servocontrol.
NOTE : When you deactivate a spoiler servocontrol, it is not necessary to
____
deactivate the symmetrical spoiler on the other wing. (This
spoiler is inhibited automatically by the SEC).
R
R
R

(1) Install the KEY-SPOILER MAINTENANCE (98D27603002000) or the KEYSPOILER MAINTENANCE (98D27603002001) (1) on the servocontrol and turn
it a quarter turn counterclockwise.
NOTE : If necessary, use a metal rod (tommy bar) dia. 4mm
____
(0.1574in.). to turn the spoiler maintenance key.
(2) Disconnect the connector (3) from the receptacle (2) of the
servocontrol.
(3) Put blanking caps on the connector (3) and receptacle (2).
(4) Attach the electrical connector to a hydraulic line with a tie-wrap.
(5) Make sure that the spoiler is in the fully retracted position.

R
R

(6) Turn the KEY-SPOILER MAINTENANCE (98D27603002000) or the KEY-SPOILER


MAINTENANCE (98D27603002001) a quarter turn clockwise and remove it.
CAUTION : MAKE SURE THAT NO SPOILER MAINTENANCE KEY STAYS ENGAGED IN
_______
THE MAINTENANCE DEVICE HOUSING. AERODYNAMIC FORCES WILL
CAUSE UNWANTED MOVEMENT OF THE SPOILER IF THE MAINTENANCE
KEY STAYS IN ITS HOUSING.
NOTE : If necessary, use a metal rod (tommy bar) dia. 4mm
____
(0.1574in.). to turn the spoiler maintenance key.
NOTE : Defective servocontrol must stay hydraulically supplied.
____
(7) Make sure that you cannot move the spoiler manually.



EFF :
ALL
 27-64-00



AIJ




Page 405
Nov 01/09

(8) On the overhead panel 23VU :


- Push the FLT CTL/SEC 1 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(9) On the overhead panel 24VU :
- Push the FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on
these pushbutton switches, the OFF legends go off).
(10) On the ECAM control panel on the center pedestal, push the F/CTL key.
On the ECAM lower display unit, the F/CTL page comes into view.
(11) Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863001) (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
Subtask 27-64-00-710-054
B. Do the operational test of the spoilers (Ref. TASK 27-64-00-710-001).
R
R
R
R

NOTE : During this test, it is important to make sure that:


____
- The spoiler you deactivated and the symmetrical spoiler on the
other wing do not operate
- The amber F/CTL SPOILER FAULT message is shown on the EWD.
5. Close-up
________
Subtask 27-64-00-860-056
A. Put the aircraft back to its initial configuration.
(1) On the panel 114VU, remove the LOCKING TOOL-FLAP SLAT LEVER,INT.
POSITION (98D27803000000) from the flap and slat control lever.
(2) Retract the flaps (Ref. TASK 27-50-00-866-009).
(3) Depressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(4) Remove the PIN-SIDE STICK LOCKING (98D27903500000) and the warning
notice from each side-stick controller.
(5) Close access door(s) in zone(s) 580, 680.
(6) Remove access platform(s).
(7) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-64-00



AIJ




Page 406
Aug 01/11

(8) Put a warning notice in the cockpit to tell the crew that the spoiler
servocontrol is deactivated.
(9) Make an entry in the log-book and record the defective servocontrol.
(10) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-64-00


R 
AIJ




Page 407
Feb 01/07

TASK 27-64-00-440-001
Reactivation of the Spoiler Servo Control
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-64-0X-A)
Spoilers
(Old MMEL ref: 27-64-01-A))

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27603002001
98D27803000000
98D27903500000

metal rod (tommy bar) dia. 4mm (0.1574 in.).


metal rod (tommy bar) dia. 4mm (01574 in.).
warning notices
access platform 3.5 m (11 ft. 6 in.)
1 KEY-SPOILER MAINTENANCE
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
2 PIN-SIDE STICK LOCKING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-50-00-866-009
27-64-00-710-001
29-10-00-864-003
29-23-00-864-001
29-24-00-864-001
TSM 27
27-64-00-991-007

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Operational Test of the Spoiler Hydraulic Actuation
Depressurize the Blue Hydraulic System
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Depressurize the Yellow Hydraulic System
(for corrective action)
Fig. 401



EFF :
ALL
 27-64-00



AIJ




Page 408
May 01/11

3. __________
Job Set-up
Subtask 27-64-00-860-058
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Remove the warning notice(s).
(3) Extend the flaps (Ref. TASK 27-50-00-866-008).
(4) On the overhead panel 23VU :
- Release the FLT CTL/SEC 1 pushbutton switch (on this pushbutton
switch, the OFF legend comes on).
(5) On the overhead panel 24VU :
- Release the FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on
these pushbutton switches, the OFF legends come on).
R
R

(6) On the panel 114VU, put the LOCKING TOOL-FLAP SLAT LEVER,INT.
POSITION (98D27803000000) in position on the flap and slat control
lever.
(7) Put the PIN-SIDE STICK LOCKING (98D27903500000) in position on each
side-stick controller.
(8) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(9) Depressurize the hydraulic system related to the spoiler that you
must reactivate.
(a) For the spoiler 1 or 5, depressurize the Green hydraulic system
(Ref. TASK 29-23-00-864-001).
(b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-864-001).
(c) For the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-64-00



AIJ




Page 409
Nov 01/09

(10) Put the access platform in position in :


(a) Zone 580 for the left spoilers.
(b) Zone 680 for the right spoilers.
(11) Open these access doors:
(a) 573BB for the left spoiler 1.
(b) 575BB for the left spoiler 2.
(c) 575DB for the left spoiler 3.
(d) 575EB for the left spoiler 4.
(e) 575GB for the left spoiler 5.
(f) 673BB for the right spoiler 1.
(g) 675BB for the right spoiler 2.
(h) 675DB for the right spoiler 3.
(i) 675EB for the right spoiler 4.
(j) 675GB for the right spoiler 5.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-00-991-007)
Subtask 27-64-00-440-050
A. Reactivation of the Spoiler Servocontrol.
R

(1) Install the KEY-SPOILER MAINTENANCE (98D27603002001) (1) and turn it


a quarter turn counterclockwise.
NOTE : If necessary, use a metal rod (tommy bar) dia. 4mm (01574
____
in.). to turn the spoiler maintenance key.
(2) Remove the tie-wraps.
(3) Remove the blanking caps from the receptacle (2) and the connector
(3).



EFF :
ALL
 27-64-00



AIJ




Page 410
Nov 01/09

(4) Connect the connector (3) to the receptacle (2) of the servocontrol.
(5) Make sure that the spoiler is in the retracted position.
(6) Turn the KEY-SPOILER MAINTENANCE (98D27603002001) a quarter clockwise
and remove it.
CAUTION : MAKE SURE THAT NO SPOILER MAINTENANCE KEY STAYS ENGAGED IN
_______
THE MAINTENANCE DEVICE HOUSING. AERODYNAMIC FORCES WILL
CAUSE UNWANTED MOVEMENT OF THE SPOILER IF THE MAINTENANCE
KEY STAYS IN ITS HOUSING.
NOTE : If necessary, use a metal rod (tommy bar) dia. 4mm (0.1574
____
in.). to turn the spoiler maintenance key.
(7) Make sure that you cannot move the spoiler manually.
(8) Remove the PIN-SIDE STICK LOCKING (98D27903500000) and the warning
notice from each side-stick controller.
(9) On the panel 114VU, remove the LOCKING TOOL-FLAP SLAT LEVER,INT.
POSITION (98D27803000000) from the flap and slat control lever.
(10) Retract the flaps (Ref. TASK 27-50-00-866-009).
(11) On the overhead panel 23VU :
- Push the FLT CTL/SEC 1 pushbutton switch (on this pushbutton
switch, the OFF legend goes off).
(12) On the overhead panel 24VU :
- Push the FLT CTL/SEC 2 and FLT CTL/SEC 3 pushbutton switches (on
these pushbutton switches, the OFF legends go off).
Subtask 27-64-00-710-053
B. Do an operational test of the reactivated spoilers (Ref. TASK 27-64-00710-001).
Subtask 27-64-00-810-050
R
R

C. Do trouble-shooting on the servocontrol of the defective spoiler (Ref.


TSM 27).



EFF :
ALL
 27-64-00



AIJ




Page 411
Feb 01/11

5. Close-up
________
Subtask 27-64-00-860-059
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close access door(s) in zone(s) 580, 680.
(3) Remove the access platform(s).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-64-00


R 
AIJ




Page 412
Feb 01/07

SPOILER HYDRAULIC ACTUATION - ADJUSTMENT/TEST


_____________________________________________
TASK 27-64-00-710-001
Operational Test of the Spoiler Hydraulic Actuation
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific

1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE



EFF :
ALL
 27-64-00



AIJ




Page 501
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
34-10-00-860-004
34-10-00-860-005

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
IR Alignment Procedure
ADIRS Stop Procedure

3. __________
Job Set-up
Subtask 27-64-00-860-050
A. Aircraft Maintenance Configuration.
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3) On the panel 114VU, make sure that the flap and the slat control
lever is set to 0.
(4) On the center pedestal, make sure that the SPEED BRAKE control lever
is set to RET.
(5) On the overhead panel 50VU, make sure that:
- the HYD/LEAK MEASUREMENT VALVES/G, B and Y pushbutton switches are
pushed (on these pushbutton switches the OFF legends are OFF).



EFF :
ALL
 27-64-00


R 
AIJ




Page 502
Feb 01/07

(6) On the overhead panel 20VU, push the ADR1, ADR2, ADR3 pushbutton
switches.
(7) On the overhead panel 23VU, make sure that the FLT CTL/ELAC1 and FLT
CTL/FAC1 pushbutton switches are pushed (on these pushbutton
switches, the FAULT and OFF legends are off).
(8) On the overhead panel 24VU, make sure that the FLT CTL/ELAC2 and FLT
CTL/FAC2 pushbutton switches are pushed (on these pushbutton
switches, the FAULT and OFF legends are off).
Subtask 27-64-00-010-056
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
Subtask 27-64-00-865-050
C. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT FLP/POS/IND 1
1CN
B12
49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/THS/ACTR/MOT2
19CE2
B09
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
49VU AUTO FLT/FAC1/28VDC
5CC1
B04
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
121VU AUTO FLT/RUDDER/TRIM/IND
15CC
M20



EFF :
ALL
 27-64-00



AIJ




Page 503
Feb 01/11

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU AUTO FLT/FAC2/28VDC
5CC2
M19
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU AUTO FLT/RUDDER/ARTF/FEEL
14CA
N17
121VU AUTO FLT/STICK/LOCK
13CA
N16
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT FLP/POS/IND2
2CN
P16
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/THS ACTR/MOT3
19CE3
Q17
121VU FLIGHT CONTROLS/THS ACTR/MOT1
19CE1
Q16
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-64-00-710-050
A. Do this test :
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the overhead panels 23VU and
24VU:
- Push the FLT CTL/SEC 1, FLT
CTL/SEC 2 and FLT CTL/SEC 3
pushbutton switches.

On the overhead panels 23VU and 24VU:


- The FAULT legends of the FLT CTL/SEC
1, FLT CTL/SEC 2 and FLT CTL/SEC 3
pushbutton switches come on then go
off, The OFF legends go off,

2. On the center pedestal, on the


ECAM control panel, push the HYD
pushbutton switch.

On the lower ECAM display unit, the HYD


page comes into view.

3. Pressurize
systems
(Ref. TASK
(Ref. TASK
(Ref. TASK

The pressure available on the hydraulic


systems is shown on the lower ECAM
display unit.

the aircraft hydraulic


29-23-00-863-001),
29-24-00-863-001),
29-10-00-863-003).



EFF :
ALL
 27-64-00



AIJ




Page 504
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------4. Align the ADIRS (Ref. TASK 34-1000-860-004).
5. On the center pedestal, on the
ECAM control panel, push the
F/CTL pushbutton switch.

On the lower ECAM display unit, the


F/CTL page comes into view.

6. For the spoiler 2, 3, 4 and 5:


- Move one of the side stick
controllers to the left until
it touches the stop.

On the lower ECAM display unit, the


F/CTL page shows the related left
spoilers extended.

NOTE : If one of the side stick


____
controllers has priority,
you can cancel the
priority. To do this, push
the pushbutton switch 8CE1
(8CE2) installed on the
side stick controller.
7. For the spoiler 2, 3, 4 and 5:
- Move one of the side stick
controllers to the right until
it touches the stop.

On the lower ECAM display unit, the


F/CTL page shows the related right
spoilers extended.

8. Set the side stick controller to


neutral.

On the lower ECAM display unit, the


F/CTL page shows all the spoilers
retracted.

9. On the overhead panels 23VU and


24VU:
- Release the FLT CTL/SEC 1, FLT
CTL/SEC 2 and FLT CTL/SEC 3
pushbutton switches.

On the overhead panels 23VU and 24VU:


- The OFF legends of the FLT CTL/SEC 1,
FLT CTL/SEC 2 and FLT CTL/SEC 3
pushbutton switches come on.

10. For the spoilers 1 and 2, start


the SEC 3:
- On the overhead panel 24VU,
push the FLT CTL/SEC 3
pushbutton switch.

- The OFF legend on the FLT CTL/SEC 3


pushbutton switch goes off.
- The FAULT legend comes on and then
goes off.
- On the lower ECAM display unit, amber
crosses go out of view for the
spoilers 1 and 2.



EFF :
ALL
 27-64-00


R 
AIJ




Page 505
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------For the spoilers 3 and 4, start
- The OFF legend on the FLT CTL/SEC 1
the SEC 1:
pushbutton switch goes off.
- On the overhead panel 23VU,
- The FAULT legend comes on and then
push the FLT CTL/SEC 1
goes off.
pushbutton switch.
- On the lower ECAM display unit, amber
crosses go out of view for the
spoilers 3 and 4.
For the spoiler 5, start the SEC
2:
- On the overhead panel 24VU,
push the FLT CTL/SEC 2
pushbutton switch.

11. For the spoiler 1, 2 , 3 and 4:


- On the center pedestal, set
the SPEED BRAKE control lever
to FULL.

- The OFF legend on the FLT CTL/SEC 2


pushbutton switch goes off.
- The FAULT legend comes on and then
goes off.
- On the lower ECAM display unit, amber
cross goes out of view for the
spoiler 5.
On the lower ECAM display unit, the
F/CTL page shows the related spoiler
extended.

NOTE : If you cannot get


____
extension of the spoiler:
- On the overhead panel
20VU, on the ADIRS CDU,
release the ADR1, ADR2,
ADR3 pushbutton
switches (the OFF
legends come on),
then push the ADR1,
ADR2, ADR3 pushbutton
switches (the OFF
legends go off).
12. For the spoiler 1, 2 , 3 and 4:
- On the center pedestal, set
the SPEED BRAKE control lever
to RET.

On the lower ECAM display unit, the


F/CTL page shows all the spoilers in
the retracted position.



EFF :
ALL
 27-64-00


R 
AIJ




Page 506
Feb 01/07

5. Close-up
________
Subtask 27-64-00-860-051
A. Put the Aircraft Back to its Initial Configuration.
(1) Depressurize the hydraulic systems (Ref. TASK 29-23-00-864-001),
(Ref. TASK 29-24-00-864-001), (Ref. TASK 29-10-00-864-003).
(2) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-64-00-410-055
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).



EFF :
ALL
 27-64-00


R 
AIJ




Page 507
Feb 01/07

TASK 27-64-00-820-001
Adjustment of the Spoilers
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
NOTE : This task can contribute to fuel savings.
____
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific

1
1

No specific
98D27603000001
98D27803000000
98D27903500000

1
1
2

circuit breaker(s) safety clip(s)


feeler gauge
warning notice
warning notices
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
SPOILER POSITION CHECK TOOL
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-64-00



AIJ




Page 508
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific

Lockwire corrosion resistant steel dia 0.8 mm (0.03


in.)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-50-00-866-009
27-60-00-866-002
27-64-00-710-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001
R
R
R

29-24-00-864-001
27-64-00-991-001
27-64-00-991-006
27-64-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
Fig. 501
Fig. 502
Fig. 503



EFF :
ALL
 27-64-00



AIJ




Page 509
Feb 01/07

3. __________
Job Set-up
Subtask 27-64-00-860-060
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the flaps are in the fully retracted position
(Ref. TASK 27-50-00-866-009).
(3) On the center pedestal, make sure that the SPEED BRAKE control lever
is set to RET.
(4) Install the PIN-SIDE STICK LOCKING (98D27903500000) on each side
stick controller.
(5) Put the warning notices on the CAPT and F/O side sticks to tell
persons not to touch the side sticks.
(6) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) on the flap and slat control lever.
(7) Put a warning notice on the center pedestal to tell persons not to
operate the SPEED BRAKE control lever.
Subtask 27-64-00-010-057
B. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


access door 822.
(a) Open the access door 822.
(b) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.

(2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at:


(a) the zone 580 for the left spoilers.
(b) the zone 680 for the right spoilers.



EFF :
ALL
 27-64-00



AIJ




Page 510
Feb 01/11

(3) Open these access doors:


(a) 573BB for the left spoiler 1.
(b) 575BB for the left spoiler 2.
(c) 575DB for the left spoiler 3.
(d) 575EB for the left spoiler 4.
(e) 575GB for the left spoiler 5.
(f) 673BB for the right spoiler 1.
(g) 675BB for the right spoiler 2.
(h) 675DB for the right spoiler 3.
(i) 675EB for the right spoiler 4.
(j) 675GB for the right spoiler 5.
Subtask 27-64-00-865-059
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-00-863-056
D. Pressurize the hydraulic system that relates to the spoiler you adjust.
(1) For the spoiler 1 or 5, pressurize the Green hydraulic system
(Ref. TASK 29-23-00-863-001).
(2) For the spoiler 2 or 4, pressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-863-001).
(3) For the spoiler 3, pressurize the Blue hydraulic system (Ref. TASK
29-10-00-863-003).



EFF :
ALL
 27-64-00


R 
AIJ




Page 511
Feb 01/07

4. Procedure
_________
(Ref. Fig. 501/TASK 27-64-00-991-001, 502/TASK 27-64-00-991-006, 503/TASK
27-64-00-991-002)
Subtask 27-64-00-220-052
R
R
R

A. Measure the clearance or the interference U between the underside of the


spoiler trailing edge and the upper surface of the flap.

R
R

(1) For the spoiler 1, measure the clearance U with a feeler gauge.
- the clearance must be:
U = 0 +0 +0.5 mm (0.0000 +0.0000 +0.0196 in.).

R
R

NOTE : You must do this measurement at the outboard end of the


____
spoiler.

R
R
R

(a) If necessary, adjust the servocontrol (Ref. Para. B).

1
_

Initially adjust the servocontrol in order to measure:


U = 4 +0 +0.5 mm (0.1574 +0.0000 +0.0196 in.).

R
R
R

2
_

Then adjust the servocontrol again by half a turn clockwise in


order to get the clearance.

R
R

(2) For the spoilers 2, 3 and 4, measure the interference U:


- the interference must be:
U = -2 +0.5 -0.5 mm (-0.0787 +0.0196 -0.0196 in.)

R
NOTE : You must do this measurement at the closest point (point where
____
the gap between the spoiler and the flap is the smallest).
R
R

(a) With the SPOILER POSITION CHECK TOOL (98D27603000001).

1
_

Install the SPOILER POSITION CHECK TOOL (98D27603000001) as


follows:
- on the upper surface of the wing
- on the trailing edge of the spoiler
- at the closest point of the spoiler.



EFF :
ALL
 27-64-00



AIJ




Page 512
Nov 01/09

R
R

Adjustment of the Spoilers


Figure 501/TASK 27-64-00-991-001



EFF :
ALL
 27-64-00



AIJ




Page 513
Feb 01/07

R
R

Measurement of Negative Clearance Between Spoiler and Flap


Figure 502/TASK 27-64-00-991-006



EFF :
ALL
 27-64-00



AIJ




Page 514
Feb 01/07

R
R

Adjustment of the Spoilers


Figure 503/TASK 27-64-00-991-002



EFF :
ALL
 27-64-00



AIJ




Page 515
Feb 01/07

2
_

Set the needle of the dial gauge to the zero position.

3
_

Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000).

4
_

Extend the flaps (Ref. TASK 27-50-00-866-008).


NOTE : Put the flap and slat control lever to the position 1.
____

5
_

Read the new position of the needle of the dial gauge.


The difference of positions gives the negative clearance U.

6
_

Retract the flaps (Ref. TASK 27-50-00-866-009).

7
_

Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000).

8
_

If necessary, adjust the servocontrol (Ref. Para. B).

R
R
R
R
R

(b) If the SPOILER POSITION CHECK TOOL (98D27603000001) is not


available, do the adjustment (Ref Para.B) to get the negative
clearance as follow:

R
R

1
_

Initially adjust the servocontrol in order to measure:


U = 2 +0.5 -0.5 mm (0.0787 +0.0196 -0.0196 in.).

R
R

2
_

Then adjust the servocontrol again by half a turn clockwise in


order to get the negative clearance.

R
R
R

(3) For the spoiler 5, measure the clearance U with a feeler gauge.
- the clearance must be:
U = 0 +0 +0.5 mm (0.0000 +0.0000 +0.0196 in.).

R
R

NOTE : You must do this measurement at the closest point (point where
____
the gap between the spoiler and the flap is the smallest).

(a) If necessary, adjust the servocontrol (Ref. Para. B).

R
R

1
_

Initially adjust the servocontrol in order to measure:


U = 4 +0 +0.5 mm (0.1574 +0.0000 +0.0196 in.).

R
R

2
_

Then adjust the servocontrol again by half a turn clockwise in


order to get the clearance.



EFF :
ALL
 27-64-00



AIJ




Page 516
Nov 01/09

Subtask 27-64-00-820-052
R
R

B. If the clearance or the interference U is not correct, do this


adjustment:

(1) Write the clearance or interference U.


(2) Depressurize the hydraulic system that relates to the spoiler you
adjust.
(a) For the spoiler 1 or 5, depressurize the Green hydraulic system
(Ref. TASK 29-23-00-864-001).
(b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-864-001).
(c) For the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(3) Extend the related spoiler by hand (Ref. TASK 27-60-00-866-002).
(4) On the servocontrol (1), remove the lockwire from the nut (3) and
discard it.
(5) Loosen the nut (3) and release the lockwashers (2).
(6) Turn the rod (4) in the related direction (Refer to the NOTE below to
find the number of turns of the rod (4)).
NOTE : If you do one turn of the rod (4), this moves the trailing
____
edge of the spoiler 8 mm (0.3149 in.).
(7) Install the lockwashers (2) and TORQUE the nut (3) to 3 m.daN (22.12
lbf.ft). Do not safety the nut at this time.
(8) Retract the related spoiler by hand (Ref. TASK 27-60-00-866-002).
(9) Pressurize the hydraulic system that relates to the spoiler you
adjust.
(a) For the spoiler 1 or 5, pressurize the Green hydraulic system
(Ref. TASK 29-23-00-863-001).
(b) For the spoiler 2 or 4, pressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-863-001).



EFF :
ALL
 27-64-00



AIJ




Page 517
Nov 01/09

(c) For the spoiler 3, pressurize the Blue hydraulic system


(Ref. TASK 29-10-00-863-003).
R

(10) Make sure that the clearance or the interference U is correct.


(11) Depressurize the hydraulic system that relates to the spoiler you
adjust.
(a) For the spoiler 1 or 5, depressurize the Green hydraulic system
(Ref. TASK 29-23-00-864-001).
(b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-864-001).
(c) For the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(12) Extend the related spoiler by hand (Ref. TASK 27-60-00-866-002).

R
R

(13) TORQUE the nut (3) to between 8 and 9 m.daN (58.99 and 66.37 lbf.ft)
and safety it with Lockwire corrosion resistant steel dia 0.8 mm
(0.03 in.).
(14) Retract the related spoiler by hand (Ref. TASK 27-60-00-866-002).
(15) Pressurize the hydraulic system that relates to the spoiler you
adjust.
(a) For the spoiler 1 or 5, pressurize the Green hydraulic system
(Ref. TASK 29-23-00-863-001).
(b) For the spoiler 2 or 4, pressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-863-001).
(c) For the spoiler 3, pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).

(16) Make sure that the clearance or the interference U is correct.


(17) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from each
sidestick controller.
(18) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) from the flap and slat control lever.



EFF :
ALL
 27-64-00



AIJ




Page 518
Nov 01/09

Subtask 27-64-00-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
21CE1, 21CE2, 21CE3, 22CE
Subtask 27-64-00-710-055
D. Do the operational test of the spoiler hydraulic actuation (Ref. TASK 2764-00-710-001).
5. Close-up
________
Subtask 27-64-00-860-061
A. Put the aircraft back to its initial configuration.
(1) Depressurize the hydraulic system that relates to the spoiler you
adjust:
(a) For the spoiler 1 or 5, depressurize the Green hydraulic system
(Ref. TASK 29-23-00-864-001).
(b) For the spoiler 2 or 4, depressurize the Yellow hydraulic system
(Ref. TASK 29-24-00-864-001).
(c) For the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(2) Remove the warning notice(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-64-00-410-056
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.



EFF :
ALL
 27-64-00


R 
AIJ




Page 519
Nov 01/09

(4) Close these access doors :


(a) 573BB for the left spoiler 1.
(b) 575BB for the left spoiler 2.
(c) 575DB for the left spoiler 3.
(d) 575EB for the left spoiler 4.
(e) 575GB for the left spoiler 5.
(f) 673BB for the right spoiler 1.
(g) 675BB for the right spoiler 2.
(h) 675DB for the right spoiler 3.
(i) 675EB for the right spoiler 4.
(j) 675GB for the right spoiler 5.
(5) Remove the access platform(s).
Subtask 27-64-00-862-058
C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-64-00


R 
AIJ




Page 520
Nov 01/09

TASK 27-64-00-760-001
Electrical Test of the spoiler Servo Controls
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
1. __________________
Reason for the Job
To confirm the cause of a spoiler servocontrol fault (flight control
computer, aircraft wiring or servocontrol).
In this procedure, you will interchange the wiring between two servocontrols
(the one that you think is unserviceable and one that you know is
serviceable).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
99D27603500000

circuit breaker(s) safety clip(s)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
2 WARNING NOTICE(S)
1 SWITCH SERV0 CTL SPLR



EFF :
ALL
 27-64-00



AIJ




Page 521
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-96-00-710-020
27-96-00-740-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
57-51-37-400-002
R
57-51-37-400-004
FOR FIN 31CE1
57-51-37-000-002
R
FOR FIN 31CE2
57-51-37-000-002
R
FOR FIN 31CE3
57-51-37-000-004
FOR FIN 31CE4
57-51-37-000-004
FOR FIN 31CE5
57-51-37-000-004
FOR FIN 31CE6
57-51-37-000-004
FOR FIN 31CE7
57-51-37-000-004
FOR FIN 31CE8
57-51-37-000-004

Operational Test of the Side Stick Assembly


(Activation for the BITE Test)
BITE Test of the EFCS (Ground Scanning)
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-64-00



AIJ




Page 522
Nov 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 31CE9
57-51-37-000-004
FOR FIN 31CE10
57-51-37-000-004

Removal of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
Subtask 27-64-00-860-066
A. Aircraft Maintenance Configuration
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
Subtask 27-64-00-865-064
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20



EFF :
ALL
 27-64-00


R 
AIJ




Page 523
Nov 01/09

Subtask 27-64-00-941-060
C. Safety Precautions
R

(1) Put a WARNING NOTICE(S) in position to tell persons not to use these
controls:
- The CAPT and F/O side sticks.
(2) Put WARNING NOTICES in position to tell persons not to operate the
hydraulic systems.
Subtask 27-64-00-010-060
D. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
applicable zone:
- For the fault on the spoiler 1 servocontrol 31CE1, at zone 573.
- For the fault on the spoiler 1 servocontrol 31CE2, at zone 673.
- For the fault on the left spoiler 2 to 5 servocontrol, at zone 575.
- For the fault on the right spoiler 2 to 5 servocontrol, at zone
675.
(2) Open the applicable access panels:
(a) FOR 31CE1
- The access panel 573BB (Ref. TASK 57-51-37-000-002).
(b) FOR 31CE2
- The access panel 673BB (Ref. TASK 57-51-37-000-002).
(c) FOR 31CE3
- The access panel 575BB (Ref. TASK 57-51-37-000-004).
(d) FOR 31CE4
- The access panel 675BB (Ref. TASK 57-51-37-000-004).
(e) FOR 31CE5
- The access panel 575DB (Ref. TASK 57-51-37-000-004).
(f) FOR 31CE6
- The access panel 675DB (Ref. TASK 57-51-37-000-004).
(g) FOR 31CE7
- The access panel 575EB (Ref. TASK 57-51-37-000-004).



R
EFF :
ALL
 27-64-00



AIJ




Page 524
Nov 01/10

(h) FOR 31CE8


- The access panel 675EB (Ref. TASK 57-51-37-000-004).
(i) FOR 31CE9
- The access panel 575GB (Ref. TASK 57-51-37-000-004).
(j) FOR 31CE10
- The access panel 675GB (Ref. TASK 57-51-37-000-004).
Subtask 27-64-00-480-052
E. Installation of the Tool
(1) If the fault is on the servocontrol:
(a) For 31CE10 or 31CE8:
- Disconnect the electrical connectors 31CE10-A and 31CE8-A.
(b) For 31CE9 or 31CE7:
- Disconnect the electrical connectors 31CE9-A and 31CE7-A.
(c) For 31CE6 or 31CE4 (or 31CE2):
- Disconnect the electrical connectors 31CE6-A and 31CE4-A (or
31CE2-A).
(d) For 31CE5 or 31CE3 (or 31CE1):
- Disconnect the electrical connectors 31CE5-A and 31CE3-A (or
31CE1-A).
(2) Connect the SWITCH SERV0 CTL SPLR (99D27603500000) to the
disconnected electrical connectors.



EFF :
ALL
 27-64-00


R 
AIJ




Page 525
Nov 01/10

INTENTIONALLY BLANK



R

 27-64-00



AIJ




Page 526
Nov 01/10

Subtask 27-64-00-865-065

R
R

F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

4. Procedure
_________

Subtask 27-64-00-760-050

A. Electrical Test of the spoiler Servo Controls

R
R

(1) Do the operational test of the side stick assembly (Activation for
the BITE test) (Ref. TASK 27-96-00-710-020).

R
R

(2) Do a BITE Test of the EFCS (Ground Scanning) (Ref. TASK 27-96-00-740001):

R
R

(a) If the fault is the same, do a check of the aircraft wiring and
of the flight control computer (Ref. TSM).

R
R

(b) If the fault is on the other side, replace the defective


servocontrol.



EFF :
ALL
 27-64-00



AIJ




Page 527
Aug 01/07

5. Close-up
________

Subtask 27-64-00-865-066

A. Open, safety and tag this(these) circuit breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

Subtask 27-64-00-080-051

B. Removal of the Tool

(1) Disconnect the SWITCH SERV0 CTL SPLR (99D27603500000).

(2) Connect the electrical connectors:

R
R

(a) For the servocontrol 31CE10 or 31CE8:


- 31CE10-A and 31CE8-A.

R
R

(b) For 31CE9 or 31CE7:


- 31CE9-A and 31CE7-A.

R
R

(c) For the servocontrol 31CE6 or 31CE4 (or 31CE2):


- 31CE6-A and 31CE4-A (or 31CE2-A).

R
R

(d) For the servocontrol 31CE5 or 31CE3 (or 31CE1):


- 31CE5-A and 31CE3-A (or 31CE1-A).



EFF :
ALL
 27-64-00



AIJ




Page 528
Aug 01/07

Subtask 27-64-00-865-067

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY
15CE1
B11
49VU FLIGHT CONTROLS/FCDC1/SPLY
20CE1
B10
49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/FCDC2/SPLY
20CE2
Q20
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY
15CE2
R20

Subtask 27-64-00-410-059

D. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) Close the access panels 573BB or 673BB or 575BB or 675BB or 575DB or
675DB or 575EB or 675EB or 575GB or 675GB, (Ref. TASK 57-51-37-400002) or (Ref. TASK 57-51-37-400-004).

Subtask 27-64-00-942-064

E. Put the aircraft back to its initial configuration.

(1) Remove the warning notice(s).

(2) Remove the access platform(s).



EFF :
ALL
 27-64-00



AIJ




Page 529
Aug 01/07

SPOILER HYDRAULIC ACTUATION - INSPECTION/CHECK


______________________________________________
TASK 27-64-00-200-001
Check of the Spoilers Servo Controls and Hinge Bearings for Excessive Play and
Condition
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THERE ARE NO PERSONS OR EQUIPMENT NEAR THE SLATS. THE SLATS
_______
WILL MOVE WITH THE FLAPS.
1. __________________
Reason for the Job
Refer to the MPD TASK: 276400-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No specific
No specific
No specific
No specific
97A27003000007
98D27603001000
98D27803000000
98D27903500000

1
1
1
1
2

corner plate
graduated scale
warning notice(s)
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
GAGE,ASSY-PUSH-PULL
LOAD APPLICATION TOOL - SPOILER
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
PIN-SIDE STICK LOCKING



EFF :
ALL
 27-64-00



AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-866-008
27-50-00-866-009
27-64-41-200-001
27-64-42-200-001
27-64-43-200-001
27-64-44-200-001
27-64-45-200-001
29-10-00-863-003
29-10-00-864-003
29-23-00-863-001
29-23-00-864-001
29-24-00-863-001

29-24-00-864-001
31-60-00-860-001
31-60-00-860-002
27-64-00-991-005

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Inspection/Check of the Spoiler 1
Inspection/Check of the Spoiler 2
Inspection/check of the Spoiler 3
Inspection/Check of the Spoiler 4
Inspection/Check of the Spoiler 5
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Pressurize the Yellow Hydraulic System with the
Electric Pump
Depressurize the Yellow Hydraulic System
EIS Start Procedure
EIS Stop Procedure
Fig. 601

3. __________
Job Set-up
Subtask 27-64-00-860-054
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the overhead panel 23VU, make sure that the FLT CTL/SEC1
pushbutton switch is pushed (the FAULT and OFF legends are off).
(3) On the overhead panel 24VU, make sure that the FLT CTL/SEC2 and FLT
CTL/SEC3 pushbutton switches are pushed (the FAULT and OFF legends
are off).



EFF :
ALL
 27-64-00



AIJ




Page 602
Feb 01/07

(4) On the center pedestal, make sure that the SPEED BRAKE lever is in
the RET position.
(5) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(6) On the center pedestal, on the ECAM control panel, push the F/CTL
pushbutton switch (on the lower ECAM display unit, the F/CTL page
comes into view).
(7) Extend the flaps (lever in the FULL position ) (Ref. TASK 27-50-00866-008).
Subtask 27-64-00-865-053
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-00-010-055
C. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position:


(a) At zone 580 for the spoilers 1,2,3,4,5 left side.
(b) At zone 680 for the spoilers 1,2,3,4,5 right side.
Subtask 27-64-00-480-051
D. Installation of the Tools

R
R

(1) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the flap and slat control lever.
(2) Install the PIN-SIDE STICK LOCKING (98D27903500000) on each side
stick controller.
(3) Put the warning notice(s) on the CAPT and F/O side stick and on the
SPEED BRAKE control lever to tell persons not to touch them.



EFF :
ALL
 27-64-00



AIJ




Page 603
Feb 01/11

(4) Install the LOAD APPLICATION TOOL - SPOILER (98D27603001000) at the


trailing edge of the spoiler, at the level of the servocontrol.
(5) Install the pointer of the LOAD APPLICATION TOOL - SPOILER
(98D27603001000) on the trailing edge of the spoiler.
(6) Install a corner plate on the adjacent structure.
(7) Install a graduated scale on the corner plate.
Subtask 27-64-00-863-051
E. Pressurize the aircraft hydraulic systems (Ref. TASK 29-23-00-863-001)
(Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863-003).
4. Procedure
_________
Subtask 27-64-00-220-051
A. Check of the Spoilers Servo-Controls and Hinge Bearings for Excessive
Play
(Ref. Fig. 601/TASK 27-64-00-991-005)
NOTE : The check is only given for one surface.
____
Do the same operations for the other surfaces.
(1) On the LOAD APPLICATION TOOL - SPOILER (98D27603001000), connect the
GAGE ASSY - PUSH-PULL TOOL GAGE,ASSY-PUSH-PULL (97A27003000007) (or
equivalent).

(2) Apply a force of 30 lbf (13.3446 daN) maximum in the up direction on


the trailing edge.
(3) Write the position of the pointer on the graduated scale.
(4) Apply a force of 30 lbf (13.3446 daN) maximum in the down direction
on the trailing edge.
(5) Write the position of the pointer on the graduated scale.
(6) Make sure that the play between the two limit positions is not more
than 1.2 mm (0.0472 in.).



EFF :
ALL
 27-64-00



AIJ




Page 604
Feb 01/11

R
R

Location of the Tools


Figure 601/TASK 27-64-00-991-005



EFF :
ALL
 27-64-00



AIJ




Page 605
Feb 01/07

(7) If the measured play is more than the maximum permitted value, repair
the bearings which attach the control surface to the structure and
the servocontrol bearings (Ref. TASK 27-64-41-200-001) (Ref. TASK 2764-42-200-001) (Ref. TASK 27-64-43-200-001) (Ref. TASK 27-64-44-200001) (Ref. TASK 27-64-45-200-001).
5. Close-up
________
Subtask 27-64-00-080-050
A. Removal of the Tools
R
R

(1) Remove the GAGE ASSY - PUSH-PULL TOOL GAGE,ASSY-PUSH-PULL


(97A27003000007), the graduated scale, the corner plate, the pointer
and the LOAD APPLICATION TOOL - SPOILER (98D27603001000).

R
R

(2) Remove the PIN-SIDE STICK LOCKING (98D27903500000) from each side
stick and the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) from the flap and slat control lever.
(3) Remove the warning notice(s).
Subtask 27-64-00-860-055
B. Put the aircraft back to its initial configuration.
(1) Retract the FLAPS (lever in the 0 position) (Ref. TASK 27-50-00-866009).
(2) Depressurise the aircraft hydraulic systems (Ref. TASK 29-23-00-864001) (Ref. TASK 29-24-00-864-001) (Ref. TASK 29-10-00-864-003).
(3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the access platform(s).
(6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-64-00



AIJ




Page 606
Feb 01/11

SPOILER 1 - REMOVAL/INSTALLATION
________________________________
TASK 27-64-41-000-001
Removal of the Spoiler 1
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers

R
No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 WARNING NOTICE(S)



EFF :
ALL
 27-64-41



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
57-51-37-000-002
27-64-41-991-001
R

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
Fig. 401

**ON A/C 001-008,


27-64-41-991-002

**ON A/C 009-100,

27-64-41-991-002-A

**ON A/C ALL

Fig. 402

Fig. 402A

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-41-991-001)
Subtask 27-64-41-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R
R

(2) Put WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic system.

R
R

(3) Put WARNING NOTICE(S) in position to tell persons not to operate the
flight controls.
Subtask 27-64-41-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-64-41



AIJ




Page 402
Feb 01/11

Spoiler 1 - Actuator Detail and Clearances


Figure 401/TASK 27-64-41-991-001



EFF :
ALL
 27-64-41



AIJ




Page 403
Aug 01/11

(1) Extend the spoiler 1 (Ref. TASK 27-60-00-866-002).


(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap and slat control lever on panel 114VU.
(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-41-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-41-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the applicable
access panel:
- for the left wing 573BB
- for the right wing 673BB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-002):
- for the left wing, remove 573BB
- for the right wing, remove 673BB.
4. Procedure
_________

R
R

(Ref. Fig. 401/TASK 27-64-41-991-001)


**ON A/C 001-008,

R
R

(Ref. Fig. 402/TASK 27-64-41-991-002)


**ON A/C 009-100,

(Ref. Fig. 402A/TASK 27-64-41-991-002-A)



EFF :
ALL
 27-64-41



AIJ




Page 404
Feb 01/11

Spoiler 1 - Hinge Detail


Figure 402/TASK 27-64-41-991-002



EFF :
001-008,
 27-64-41



AIJ




Page 405
Aug 01/11

Spoiler 1 - Hinge Detail


Figure 402A/TASK 27-64-41-991-002-A



EFF :
009-100,
 27-64-41



AIJ




Page 406
Aug 01/11

**ON A/C ALL


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

**ON A/C 001-008,


Subtask 27-64-41-020-050
A. Removal of the Spoiler 1
(Ref. Fig. 401/TASK 27-64-41-991-001, 402/TASK 27-64-41-991-002)

(1) Remove the nuts (49), the washers (50) and the bolts (47) to
disconnect the bonding straps (48) from each end of the spoiler 1.
(2) Remove the nuts (19), (36), (39) and (51) and the locking plates
(20), (37), (40) and (52).
(3) Remove the spacer (38) and the bolt (28).
(4) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (27) and (29) from the locking
caps (26) and (30).
(d) Remove and discard the cotter pins (46) and (59) from the locking
caps (45) and (58).
(e) Remove the locking caps (26), (30), (45) and (58).
(f) Remove the nuts (25), (31), (44) and (57).
(g) Remove the washers (24), (32), (43) and (56).
(5) Do not remove the hinge pins (21), (35), (41) and (53).



EFF :
ALL
 27-64-41



AIJ




Page 407
Feb 01/11

(6) Prepare the spoiler 1 for removal:


CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 1 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8) and carefully lower the
actuator. Remove the sliding bush (5) and the flanged bush (7).
(7) Leave the supports in place below the spoiler. Remove the hinge pins
(21), (35), (41) and (53). Collect the sliding bushes (22), (34),
(42), (54) and (55) and the flanged bushes (23) and (33).
(8) Remove the spoiler from the wing.
**ON A/C 009-100,
Subtask 27-64-41-020-050-A
A. Removal of the Spoiler 1
(Ref. Fig. 401/TASK 27-64-41-991-001, 402A/TASK 27-64-41-991-002-A)
(1) Remove the nuts (50), the washers (51) and the bolts (48) to
disconnect the bonding straps (49) from each end of the spoiler 1.
(2) Remove the nuts (19), (37), and (40) and the locking plates (20),
(38) and (41).
(3) Remove the nut (62), the bolt (53), the washer (52), the locking
plates (54) and the spacer (63).
(4) Remove the spacer (39), the bolt (29) and the washer (28).
(5) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (27) and (30) from the locking
caps (26) and (31).



EFF :
ALL
 27-64-41



AIJ




Page 408
Aug 01/11

(d) Remove the locking caps (26) and (31), the nuts (25) and (32) and
the washers (24) and (33).
(e) Remove and discard the cotter pins (47) and (61) from the locking
caps (46) and (60).
(f) Remove the locking caps (46) and (60), the nuts (45) and (59) and
the washers (44) and (58).
(6) Do not remove the hinge pins (21), (36), (42) and (55).
(7) Prepare the spoiler 1 for removal:
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 1 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8) and carefully lower the
actuator. Remove the sliding bush (5) and the flanged bush (7).
(8) Leave the supports in place below the spoiler. Remove the hinge pins
(21), (36), (42) and (55). Collect the sliding bushes (22), (35),
(43), (56) and (57) and the flanged bushes (23) and (34).
(9) Remove the spoiler from the wing.



EFF :
009-100,
 27-64-41



AIJ




Page 409
Aug 01/11

**ON A/C ALL


TASK 27-64-41-400-001
Installation of the Spoiler 1
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-64-41



AIJ




Page 410
Aug 01/11

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
No specific
No specific
No specific
No specific
No specific
98D27603002000
98D27603002001

AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 KEY-SPOILER MAINTENANCE
2 KEY-SPOILER MAINTENANCE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
Material No. 09-018B
Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-64-41



AIJ




Page 411
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R
R
R

1
27
27
29
29
30
30
46
46
47
47
59
59
61
61

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05

01B-020
11 -080
11B-080
11 -080
11B-080
11 -080
11B-080
11 -210
11B-210
11 -210
11B-210
11 -210
11B-210
11 -210
11B-210

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
29-10-00-863-001
57-51-37-400-002
R

ASRM 57-70-00-201
27-64-41-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Pressurize the Green Hydraulic System
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
Fig. 401

**ON A/C 001-008,


27-64-41-991-002

Fig. 402



EFF :
ALL
 27-64-41



AIJ




Page 412
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------**ON A/C 009-100,
27-64-41-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-41-991-001)
Subtask 27-64-41-941-055
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the WARNING NOTICE(S) to tell persons not to
pressurize the hydraulic systems is in position.
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-64-41-860-052
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the spoiler 1 is extended (Ref. TASK 27-60-00-866002).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-41


R 
AIJ




Page 413
Aug 01/11

Subtask 27-64-41-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-41-991-001)
**ON A/C 001-008,
(Ref. Fig. 402/TASK 27-64-41-991-002)
**ON A/C 009-100,
(Ref. Fig. 402A/TASK 27-64-41-991-002-A)
**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-41-560-050
A. Preparation of a Replacement Component
R

(1) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.



EFF :
ALL
 27-64-41



AIJ




Page 414
Aug 01/11

**ON A/C 001-008,


Subtask 27-64-41-420-051
B. Preparation for Installation
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the:
- hinges on the false rear spar
- hinges on the spoiler
- sliding bushes (5), (22), (34), (42), (54) and (55)
- flanged bushes (7), (23) and (33)
- hinge pins (6), (21), (35), (41) and (53).
(5) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo-control spherical
____
bearing.
Subtask 27-64-41-420-050
C. Installation of the Spoiler 1

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.



EFF :
001-008,
 27-64-41



AIJ




Page 415
Aug 01/11

CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the sliding bushes (22), (34), (42), (54) and (55) and the
flanged bushes (23) and (33).
R
R

(2) Make sure there are supports below the spoiler 1 to hold it in the
correct position.
(3) Install the hinge pins (21), (35), (41) and (53) through the false
rear spar fittings and the spoiler fittings.
(4) Install the flanged bush (7) in the spoiler fitting.
(5) Lift the spoiler actuator and hold it in the correct position so that
the greaser on the eye-end (8) points down.
(6) Install the hinge pin (6) through the flanged bush (7), and the
actuator eye-end (8).

R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.

R
R
R
R

(7) Measure the dimension T. The dimension T must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.

(8) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.

(9) Install the items that follow:


(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (24) and (32) and the nuts (25) and (31) on
the hinge pins (21) and (35).
(d) Install the washers (43) and (56) and the nuts (44) and (57) on
the hinge pins (41) and (53).



EFF :
001-008,
 27-64-41



AIJ




Page 416
Aug 01/11

(e) TORQUE the nuts (25) and (31) to between 3.0 and 3.5 m.daN (22.12
and 25.81 lbf.ft).
(f) TORQUE the nuts (44) and (57) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (26) and (30) on the nuts (25) and (31).
(i) Install the locking caps (45) and (58) on the nuts (44) and (57).
R

(10) Safety the items that follow:


- the locking cap (2) with the new cotter pin (1)
- the locking cap (26) with the new cotter pin (27)
- the locking cap (30) with the new cotter pin (29)
- the locking cap (45) with the new cotter pin (46)
- the locking cap (58) with the new cotter pin (59).

(11) Clean the interfaces of the bolt (28) and the spacer (38) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

(12) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) around the interfaces of the bolt (28).

(13) Install the bolt (28) and the spacer (38).

(14) Install the locking plates (20), (37), (40) and (52) and attach them
with the nuts (19), (36), (39) and (51).

(15) TORQUE the nuts (19), (36), (39) and (51) to between 0.25 and 0.30
m.daN (22.12 and 26.54 lbf.in).

(16) Attach the bonding straps (48) to each end of the spoiler with the
bolts (47), the washers (50) and the nuts (49) (Ref. TASK 20-28-00912-004).
Subtask 27-64-41-916-051
D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.



R
EFF :
001-008,
 27-64-41



AIJ




Page 417
Aug 01/11

(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (1), (27), (29), (46) and (59)
locking caps (2), (26), (30), (45) and (58)
nuts (3), (25), (31), (44) and (57)
washers (4), (24), (32), (43) and (56)
hinge pins (6), (21), (35), (41) and (53)
nuts (19), (36), (39) and (51)
bolt (28).

**ON A/C 009-100,


Subtask 27-64-41-420-051-A
B. Preparation for Installation
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the:
- hinges on the false rear spar
- hinges on the spoiler
- sliding bushes (5), (22), (35), (43), (56) and (57)
- flanged bushes (7), (23) and (34)
- hinge pins (6), (21), (36), (42) and (55).
(5) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo-control spherical
____
bearing.



R
EFF :
ALL
 27-64-41



AIJ




Page 418
Aug 01/11

Subtask 27-64-41-420-050-A
C. Installation of the Spoiler 1
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.

R
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the sliding bushes (22), (35), (43), (56) and (57) and the
flanged bushes (23) and (34).
R
R

(2) Make sure there are supports below the spoiler 1 to hold it in the
correct position.
(3) Install the hinge pins (21), (36), (42) and (55) through the false
rear spar fittings and the spoiler fittings.
(4) Install the flanged bush (7) in the spoiler fitting.
(5) Lift the spoiler actuator and hold it in the correct position so that
the greaser on the eye-end (8) points down.
(6) Install the hinge pin (6) through the flanged bush (7) and the
actuator eye-end (8).

R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.

R
R
R
R

(7) Measure the dimension T. The dimension T must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.

(8) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.



EFF :
009-100,
 27-64-41



AIJ




Page 419
Aug 01/11

(9) Install the items that follow:


(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (24) and (33) and the nuts (25) and (32) on
the hinge pins (21) and (36).
(d) TORQUE the nuts (25) and (32) to between 3.0 and 3.5 m.daN (22.12
and 25.81 lbf.ft).
(e) Install the washers (44) and (58) and the nuts (45) and (59) on
the hinge pins (42) and (55).
(f) TORQUE the nuts (45) and (59) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (26) and (31) on the nuts (25) and (32).
(i) Install the locking caps (46) and (60) on the nuts (45) and (59).

(10) Safety the items that follow:


- the locking cap (2) with the new cotter pin (1)
- the locking cap (26) with the new cotter pin (27)
- the locking cap (31) with the new cotter pin (30)
- the locking cap (46) with the new cotter pin (47)
- the locking cap (60) with the new cotter pin (61).

R
R
R
R

(11) Clean the interfaces of the bolt (29) and the spacer (39) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

(12) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) around the interfaces of the bolt (29).

(13) Install the bolt (29), the washer (28) and the spacer (39).

(14) Install the locking plates (20), (38), (41) and attach them with the
nuts (19), (37) and (40).

(15) Put in position the spacer (63), the locking plate (54) and the
washer (52).



R
EFF :
009-100,
 27-64-41



AIJ




Page 420
Aug 01/11

(16) Install the bolt (53), and the nut (62).

(17) TORQUE the nuts (19), (37), (40) and (62) to between 0.25 and 0.30
m.daN (22.12 and 26.54 lbf.in).

(18) Attach the bonding straps (49) to each end of the spoiler with the
bolts (48), the washers (51) and the nuts (50) (Ref. TASK 20-28-00912-004).
Subtask 27-64-41-916-051-A
D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (1), (27), (30), (47) and (61)
locking caps (2), (26), (31), (46) and (60)
nuts (3), (25), (32), (45) and (59)
washers (4), (24), (33), (44) and (58)
hinge pins (6), (21), (36), (42) and (55)
nuts (19), (37), (40) and (62)
bolt (29) and (53).

**ON A/C ALL


Subtask 27-64-41-860-051
E. Aircraft Maintenance Configuration
(1) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(2) Retract the spoiler 1 (Ref. TASK 27-60-00-866-002).
R
R

(3) On the servo-control, turn the KEY-SPOILER MAINTENANCE or the KEYSPOILER MAINTENANCE in the maintenance device to the operation
position and then remove it.
(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap
and slat control lever on panel 114VU.



EFF :
ALL
 27-64-41



AIJ




Page 421
Aug 01/11

Subtask 27-64-41-865-053
F. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-64-41-820-051
G. Clearance Check
R
R

(1) Make sure that the clearances X and V are between 1.0 mm (0.0393
in.) and 3.0 mm (0.1181 in.). Adjust the seals if it is necessary.

R
R

(2) Make sure that the clearance W is between 5.0 mm (0.1968 in.) and
8.0 mm (0.3149 in.).

R
R

(3) Make sure that the clearance Y is between 5.5 mm (0.2165 in.) and
7.5 mm (0.2952 in.).

R
R
R
R
R
R
R

(4) Make sure that:


- when there is no step condition, the value of the clearance Z is
between 1.83 mm (0.0720 in.) and 3.09 mm (0.1216 in.)
- when a step condition exists, the value of the clearance Z is
between 0.9 mm (0.0354 in.) and 4.1 mm (0.1614 in.).
The spoiler and the structure must make a continuous surface. The
seal must touch the trailing edge structure along its full length.
(5) Pressurize the Green Hydraulic system (Ref. TASK 29-10-00-863-001).

R
R

(6) Adjust the spoiler to give the dimension U between the spoiler and
the flap (Ref. TASK 27-64-00-820-001).
Subtask 27-64-41-410-052
H. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels (Ref. TASK 57-51-37-400-002):
- for the left wing, install 573BB
- for the right wing, install 673BB.



EFF :
ALL
 27-64-41



AIJ




Page 422
Aug 01/11

(3) Remove the access platform(s).


Subtask 27-64-41-865-054
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-41-710-050
K. Operational Test
(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).
5. Close-up
________
Subtask 27-64-41-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-41



AIJ




Page 423
Aug 01/11

SPOILER 1 - INSPECTION/CHECK
____________________________
TASK 27-64-41-200-001
Inspection/Check of the Spoiler 1
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement is more than that in TASK 27-64-00-200-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice



EFF :
ALL
 27-64-41


R 
AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-64-41-000-001
27-64-41-400-001
R

Removal of the Spoiler 1


Installation of the Spoiler 1

**ON A/C 001-008,


27-64-41-991-003

**ON A/C 009-100,

27-64-41-991-003-A

**ON A/C ALL

Fig. 601

Fig. 601A

3. __________
Job Set-up
Subtask 27-64-41-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-64-41-010-051
B. Get Access
(1) Remove the spoiler 1 (Ref. TASK 27-64-41-000-001).
4. Procedure
_________
R

**ON A/C 001-008,


(Ref. Fig. 601/TASK 27-64-41-991-003)



EFF :
ALL
 27-64-41



AIJ




Page 602
Feb 01/11

Spoiler 1
Figure 601/TASK 27-64-41-991-003


R
EFF :
001-008,
 27-64-41



AIJ




Page 603
Feb 01/11

**ON A/C 009-100,

R
R

(Ref. Fig. 601A/TASK 27-64-41-991-003-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-41-220-051
A. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 2
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| B
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 1
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41



AIJ




Page 604
Feb 01/11

R
R

Spoiler 1
Figure 601A/TASK 27-64-41-991-003-A



R
EFF :
009-100,
 27-64-41



AIJ




Page 605
Feb 01/11

Subtask 27-64-41-220-052
B. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| B
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 2
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-053
C. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 606
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| B
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 4
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-054
D. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 4
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| B
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 1
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 607
Feb 01/11

Subtask 27-64-41-220-055
E. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| B
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 5
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-056
F. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 608
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.801 | 15.828 |
|
| 15.747 |
|
|
| OD 5
|(0.6220) |(0.6231) |
|
|(0.6199) |
|
|
|
|
|
| 0.034 | 0.074 |
|
| 0.182 |
|
|
|
| (0.0013)| (0.0029)|
|
|(0.0071)|
| B
| 15.862 | 15.875 |
|
|
| 15.929 |
|
| ID 6
|(0.6244) |(0.6250) |
|
|
|(0.6271) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-057
G. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 609
Feb 01/11

Subtask 27-64-41-220-058
H. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-059
J. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-060
K. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 5
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 611
Feb 01/11

Subtask 27-64-41-220-061
L. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 5
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| C
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 6
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-062
M. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 612
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 2
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| D
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 1
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-063
N. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| D
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 2
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 613
Feb 01/11

Subtask 27-64-41-220-064
P. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| D
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 4
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-065
Q. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 614
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 4
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| D
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 1
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-066
R. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 12.683 | 12.694 |
|
| 12.658 |
|
|
| OD 3
|(0.4993) |(0.4997) |
|
|(0.4983) |
|
|
|
|
|
| 0.006 | 0.044 |
|
| 0.094 |
|
|
|
| (0.0002)| (0.0017)|
|
|(0.0037)|
| D
| 12.700 | 12.727 |
|
|
| 12.752 |
|
| ID 5
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 615
Feb 01/11

Subtask 27-64-41-220-067
S. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 15.801 | 15.828 |
|
| 15.747 |
|
|
| OD 5
|(0.6220) |(0.6231) |
|
|(0.6199) |
|
|
|
|
|
| 0.034 | 0.073 |
|
| 0.181 |
|
|
|
| (0.0013)| (0.0028)|
|
|(0.0071)|
| D
| 15.862 | 15.874 |
|
|
| 15.928 |
|
| ID 6
|(0.6244) |(0.6249) |
|
|
|(0.6270) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-068
T. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 616
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-069
U. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 617
Feb 01/11

Subtask 27-64-41-220-070
V. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-071
W. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 618
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 4
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| E
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-072
X. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 2
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| F
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 1
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 619
Feb 01/11

Subtask 27-64-41-220-073
Y. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 3
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| F
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 2
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-074
Z. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-41


R 
AIJ




Page 620
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 22.184 | 22.205 |
|
| 22.164 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8725) |
|
|
|
|
|
| 0.008 | 0.041 |
|
| 0.090 |
|
|
|
| (0.0003)| (0.0016)|
|
|(0.0035)|
| F
| 22.213 | 22.225 |
|
|
| 22.254 |
|
| ID 6
|(0.8745) |(0.8750) |
|
|
|(0.8761) |
|
------------------------------------------------------------------------------Subtask 27-64-41-220-075
AA. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 4
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| F
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 5
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-41


R 
AIJ




Page 621
Feb 01/11

Subtask 27-64-41-220-076
AB. Dimensions of the Spoiler 1
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| F
| 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 4
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------5. Close-up
________
Subtask 27-64-41-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the spoiler 1 (Ref. TASK 27-64-41-400-001).
Subtask 27-64-41-942-053
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-41



AIJ




Page 622
Feb 01/11

SPOILER 2 - REMOVAL/INSTALLATION
________________________________
TASK 27-64-42-000-001
Removal of the Spoiler 2
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 WARNING NOTICE(S)



EFF :
ALL
 27-64-42



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
57-51-37-000-004
27-64-42-991-001

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

**ON A/C 001-008,


27-64-42-991-002

Fig. 402

**ON A/C 009-100,


27-64-42-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-42-991-001)
Subtask 27-64-42-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.



EFF :
ALL
 27-64-42



AIJ




Page 402
Aug 01/11

Spoiler 2 - Actuator Detail and Clearances


Figure 401/TASK 27-64-42-991-001



EFF :
ALL
 27-64-42



AIJ




Page 403
Aug 01/11

Subtask 27-64-42-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the spoiler 2 (Ref. TASK 27-60-00-866-002).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.
(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-42-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-42-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panel:
- for the left wing 575BB
- for the right wing 675BB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-004):
- for the left wing, remove 575BB
- for the right wing, remove 675BB.



EFF :
ALL
 27-64-42



AIJ




Page 404
Aug 01/11

4. Procedure
_________
R
R

(Ref. Fig. 401/TASK 27-64-42-991-001)


**ON A/C 001-008,

R
R

(Ref. Fig. 402/TASK 27-64-42-991-002)


**ON A/C 009-100,

R
R

(Ref. Fig. 402A/TASK 27-64-42-991-002-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-42-020-050
A. Removal of the Spoiler 2
(1) Remove the nuts (45), the washers (46) and the bolts (43) to
disconnect the bonding straps (44) from each end of the spoiler 2.
(2) Remove the nuts (28), (35) and (55) and the locking plates (27), (36)
and 54).
(3) Remove the spacer (29) and the bolt (20).
(4) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (42) and (47) from the locking
caps (41) and (48).



EFF :
ALL
 27-64-42



AIJ




Page 405
Feb 01/11

Spoiler 2 - Hinge Detail


Figure 402/TASK 27-64-42-991-002



EFF :
001-008,
 27-64-42



AIJ




Page 406
Aug 01/11

Spoiler 2 - Hinge Detail


Figure 402A/TASK 27-64-42-991-002-A



EFF :
009-100,
 27-64-42



AIJ




Page 407
Aug 01/11

(d) Remove and discard the cotter pins (21) and (34) from the locking
caps (22) and (33).
(e) Remove the locking caps (22), (33), (41) and (48).
(f) Remove the nuts (23), (32), (40) and (49).
(g) Remove the washers (24), (31), (39) and (50).
(5) Do not remove the hinge pins (26), (30), (37) and (53).
(6) Prepare the spoiler 2 for removal:
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 2 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8) and carefully lower the
actuator.
(7) Remove the sliding bush (5) and the flanged bush (7) from the spoiler
actuator-bracket.
(8) Keep the supports in position below the spoiler and remove the hinge
pins (26), (30), (37) and (53). Collect the sliding bushes (25),
(38), (51) and (52).
(9) Remove the spoiler.



EFF :
ALL
 27-64-42



AIJ




Page 408
Aug 01/11

TASK 27-64-42-400-001
Installation of the Spoiler 2
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

R
No specific
98D27603002000

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
2 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-42



AIJ




Page 409
Aug 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27603002001

2 KEY-SPOILER MAINTENANCE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
21
21
34
34
42
42
47
47

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05



EFF :
ALL
 27-64-42



AIJ




01B-020
12 -280
12B-280
12 -050
12B-050
12 -160
12B-160
12 -160
12B-160

Page 410
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004

27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
29-10-00-863-002
57-51-37-400-004

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Pressurize the Yellow Hydraulic System
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

ASRM 57-70-00-201
27-64-42-991-001

Fig. 401

**ON A/C 001-008,


27-64-42-991-002

Fig. 402

**ON A/C 009-100,


27-64-42-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-42-991-001)
Subtask 27-64-42-941-054
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.



EFF :
ALL
 27-64-42



AIJ




Page 411
Aug 01/11

Subtask 27-64-42-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(2) Make sure that the spoiler 2 is extended (Ref. TASK 27-60-00-866002).
(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-42-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
R
R

(Ref. Fig. 401/TASK 27-64-42-991-001)


**ON A/C 001-008,

R
R

(Ref. Fig. 402/TASK 27-64-42-991-002)


**ON A/C 009-100,

(Ref. Fig. 402A/TASK 27-64-42-991-002-A)



EFF :
ALL
 27-64-42



AIJ




Page 412
Feb 01/11

**ON A/C ALL


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-42-560-050
R

A. Preparation of a Replacement Component

(1) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.
Subtask 27-64-42-420-051
B. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the:
- hinges on the rear spar
- hinges on the spoiler
- sliding bushes (5), (25), (38), (51) and (52)
- flanged bush (7)
- hinge pins (6), (26), (30), (37) and (53).



EFF :
ALL
 27-64-42



AIJ




Page 413
Aug 01/11

Subtask 27-64-42-916-050
C. Application of Special Materials
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo-control spherical
____
bearing.
Subtask 27-64-42-420-050
D. Installation of the Spoiler 2

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the sliding bushes (25), (38), (51) and (52).

R
R

(2) Make sure there are supports below the spoiler 2 to hold it in the
correct position.
(3) Install the hinge pins (26), (30), (37) and (53) through the rear
spar fittings and the spoiler fittings.
(4) Install the flanged bush (7) in the spoiler fitting.
(5) Lift the spoiler actuator and hold it in the correct position so that
the greaser on the eye-end (8) points down.
(6) Install the hinge pin (6) through the flanged bush (7) and the
actuator eye-end (8).

R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.



EFF :
ALL
 27-64-42



AIJ




Page 414
Aug 01/11

R
R
R
R

(7) Measure the dimension T. The dimension must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.

(8) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.

(9) Install the items that follow:


(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (24) and (31) and the nuts (23) and (32) on
the hinge pins (26) and (30).
(d) Install the washers (39) and (50) and the nuts (40) and (49) on
the hinge pins (37) and (53).

R
R

(e) TORQUE the nuts (23) and (32) to between 3.5 and 4.0 m.daN (25.81
and 29.49 lbf.ft).
(f) TORQUE the nuts (40) and (49) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (22) and (33) on the nuts (23) and (32).
(i) Install the locking caps (41) and (48) on the nuts (40) and (49).

(10) Safety the items that follow:


- the locking cap (2) with the new cotter pin (1)
- the locking cap (22) with the new cotter pin (21)
- the locking cap (33) with the new cotter pin (34)
- the locking cap (41) with the new cotter pin (42)
- the locking cap (48) with the new cotter pin (47).

(11) Clean the interfaces of the bolt (20) and the spacer (29) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

R
R

(12) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (20) and the
spacer (29).



EFF :
ALL
 27-64-42



AIJ




Page 415
Aug 01/11

(13) Install the bolt (20) and the spacer (29).

(14) Install the locking plates (27), (36) and (54) and then attach them
with the nuts (28), (35) and (55).

(15) TORQUE the nuts (28), (35) and (55) to between 0.25 and 0.30 m.daN
(22.12 and 26.54 lbf.in).

(16) Attach the bonding straps (44) to each end of the spoiler with the
bolts (43), the washers (46) and the nuts (45) (Ref. TASK 20-28-00912-004).
Subtask 27-64-42-916-051
E. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.
(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (1), (21), (34), (42) and (47)
locking caps (2), (22), (33), (41) and (48)
nuts (3), (23), (32), (40) and (49)
washers (4), (24), (31), (39) and (50)
hinge pins (6), (26), (30), (37) and (53)
nuts (28), (35) and (55)
bolt (20).

Subtask 27-64-42-860-051
F. Aircraft Maintenance Configuration
(1) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.
(2) Retract the spoiler 2 (Ref. TASK 27-60-00-866-002).
R
R

(3) On the servo-control, turn the KEY-SPOILER MAINTENANCE or the KEYSPOILER MAINTENANCE in the maintenance device to the operation
position and then remove it.
(4) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.



EFF :
ALL
 27-64-42



AIJ




Page 416
Aug 01/11

Subtask 27-64-42-865-053
G. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-64-42-820-051
H. Clearance Checks
R
R

(1) Make sure that the clearance X is between 1.0 mm (0.0393 in.) and
3.0 mm (0.1181 in.). Adjust the seal if it is necessary.

R
R

(2) Make sure that the clearance V is between 0 mm (0.0000 in.) and 0.5
mm (0.0196 in.). Adjust the seals if it is necessary.

R
R

(3) Make sure that the clearance Y is between 5.5 mm (0.2165 in.) and
7.5 mm (0.2952 in.).

R
R

(4) Make sure that the clearance W is between 16.0 mm (0.6299 in.) and
20.0 mm (0.7874 in.).

R
R
R
R
R
R
R

(5) Make sure that:


- when there is no step condition, the value of the clearance Z is
between 1.63 mm (0.0641 in.) and 2.82 mm (0.1110 in.)
- when a step condition exists, the value of the clearance Z is
between 0.7 mm (0.0275 in.) and 3.83 mm (0.1507 in.)
The spoiler and the structure must make a continuous surface. The
seal must touch the trailing edge along its full length.
(6) Pressurize the Yellow Hydraulic system (Ref. TASK 29-10-00-863-002).
(7) Adjust the spoiler to give the dimension U between the spoiler and
the flap (Ref. TASK 27-64-00-820-001).
Subtask 27-64-42-410-052
J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panel 575BB, 675BB (Ref. TASK 57-51-37-400-004):



EFF :
ALL
 27-64-42



AIJ




Page 417
Aug 01/11

(3) Remove the access platform(s).


Subtask 27-64-42-865-054
K. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-42-710-050
L. Operational Test
(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).
5. Close-up
________
Subtask 27-64-42-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-42



AIJ




Page 418
Aug 01/11

TASK 27-64-42-000-002
Removal of the Link-Spoiler 2
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27604000000
98D27803000000

1
AR
1
1

circuit breaker(s) safety clip(s)


safety barriers
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
WARNING NOTICE(S)
COLLAR-SAFETY, SPOILER
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-64-42



AIJ




Page 419
Aug 01/11

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

27-60-00-866-002
57-51-37-000-004

3. __________
Job Set-up

Subtask 27-64-42-941-055

A. Safety Precautions

27-64-42-991-004

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Put the safety barriers in position.

R
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

R
R

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.

Subtask 27-64-42-860-053

B. Aircraft Maintenance Configuration

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

(1) Extend the spoiler 2 (Ref. TASK 27-60-00-866-002).

R
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.

R
R

(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-42



AIJ




Page 420
Feb 01/11

Subtask 27-64-42-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-42-010-053
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panel:
- for the left wing 575BB
- for the right wing 675BB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-004):
- for the left wing, remove 575BB
- for the right wing, remove 675BB.
4. Procedure
_________
Subtask 27-64-42-020-052
A. Removal of the Link-Spoiler 2
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
(Ref. Fig. 403/TASK 27-64-42-991-004)
(1) Remove the nuts (22) and the locking plates (21).
(2) Remove the spacer (23) and the bolt (24).
(3) Remove and discard the cotter pins (12) and (25) from the locking
caps (11) and (26).



EFF :
ALL
 27-64-42



AIJ




Page 421
Aug 01/11

R
R

Link-Spoiler 2
Figure 403/TASK 27-64-42-991-004



EFF :
ALL
 27-64-42



AIJ




Page 422
Feb 01/11

(4) Remove the locking caps (11) and (26).


(5) Remove the nuts (10) and (27) and the washers (9) and (28).
(6) Remove the hinge pins (1) and (20) and the sliding bush (29).
(7) Remove and discard the cotter pins (6) and (13) from the nuts (5) and
(14).
(8) Remove the nuts (5) and (14) and the washers (4) and (15).
(a) Remove the bolts (2) and (18) and the bushes (3) and (17).
(b) Remove the bushes (7) and (16) and the links-spoiler 2 (8) and
(19).



EFF :
ALL
 27-64-42


R 
AIJ




Page 423
Aug 01/11

TASK 27-64-42-400-002
Installation of the Link-Spoiler 2
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No
No
No
No

specific
specific
specific
specific

No specific
No specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


AR SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-64-42



AIJ




Page 424
Aug 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

98D27604000000
98D27803000000

1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Material No. 04-004


Material No. 09-018B
Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R

12
12
25
25

cotter
cotter
cotter
cotter

pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05



EFF :
ALL
 27-64-42



AIJ




12 -280
12B-280
12 -280
12B-280

Page 425
Feb 01/11

D. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R

27-60-00-866-002
27-64-00-200-001

3. __________
Job Set-up

Subtask 27-64-42-941-056

A. Safety Precautions

27-64-00-710-001
57-51-37-000-004
57-51-37-400-004
27-64-42-991-004

Extension-Retraction of the Spoilers for Maintenance


Check of the Spoilers Servo Controls and Hinge
Bearings for Excessive Play and Condition
Operational Test of the Spoiler Hydraulic Actuation
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

R
R

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.

Subtask 27-64-42-860-054

B. Aircraft Maintenance Configuration

R
R

(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.

R
R

(2) Make sure that the spoiler 2 is extended (Ref. TASK 27-60-00-866002).

R
R

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-42



AIJ




Page 426
Feb 01/11

(4) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is below the
applicable access panel:
- for the left wing 575BB
- for the right wing 675BB.
(5) Make sure that the applicable access panel (Ref. TASK 57-51-37-000004) is removed:
- for the left wing, 575BB
- for the right wing, 675BB.
Subtask 27-64-42-865-056
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
Subtask 27-64-42-420-052
A. Preparation for Installation
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE
_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-64-42



AIJ




Page 427
Aug 01/11

(4) Apply COMMON GREASE (Material No. 04-004) to the:


- hinges on the rear spar,
- hinges on the spoiler,
- sliding bushes (29),
- hinge pins (1) and (20).
Subtask 27-64-42-420-053
B. Installation of the Link-Spoiler 2
WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE
_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(Ref. Fig. 403/TASK 27-64-42-991-004)
(1) Put the bushes (7) and (16) and the end of the links-spoiler 2 (8)
and (19) in position on the spoiler brackets.
(2) Install the bushing (3) and (17) and the bolts (2) and (18).
(3) Install the washers (4) and (15) and the nuts (5) and (14).
(4) TORQUE the nuts (5) and (14) to between 1.13 and 1.36 m.daN (99.99
and 120.35 lbf.in).
(5) Safety the nuts (5) and (14) with the new cotter pins (6) and (13).
(6) Put the links-spoiler 2 (8) and (19) and the sliding bush (29) in
position through the rear spar fittings and the spoiler fittings.
(7) Install the hinge pins (1) and (20) through the rear spar fittings,
the links-spoiler 2 (8) and (19) and the spoiler fittings.
(8) Install the washers (9) and (28) and the nuts (10) and (27) on the
hinge pins (1) and (20).
(9) TORQUE the nuts (10) and (27) to between 3.5 and 4.0 m.daN (25.81 and
29.49 lbf.ft).
(10) Install the locking caps (11) and (26) on the nuts (10) and (27).
(11) Safety the locking caps (11) with the new cotter pin (12) and (26)
with the new cotter pin (25).



EFF :
ALL
 27-64-42


R 
AIJ




Page 428
Aug 01/11

R
R
R

(12) Clean the interfaces of the bolt (24) and the spacer (23) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

R
R
R

(13) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (24) and the
spacer (23).

(14) Install the bolt (24).

(15) Install the spacer (23), the locking plate (21) and the nut (22).

R
R

(16) TORQUE the nut (22) to between 0.25 and 0.30 m.daN (22.12 and 26.54
lbf.in).

Subtask 27-64-42-220-067

R
R

C. Check of the Spoilers Servo Controls and Hinge Bearings for Excessive
Play and Condition

R
R
R

(1) Do a check of the spoilers servo controls and hinge bearings for
excessive play and condition (Ref. TASK 27-64-00-200-001).
Subtask 27-64-42-916-052

D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R
R
R
R
R
R

(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (12) and (25),
locking caps (11) and (26),
nuts (10) and (27),
washers (9) and (28),
hinge pins (1) and (20),
nut (22),
bolt (24).



EFF :
ALL
 27-64-42



AIJ




Page 429
Feb 01/11

5. Close-up
________

Subtask 27-64-42-860-055

A. Aircraft Maintenance Configuration

R
R

(1) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the
servo-control.

(2) Retract the spoiler 2 (Ref. TASK 27-60-00-866-002).

R
R

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.

Subtask 27-64-42-410-053

B. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) Install the access panel (Ref. TASK 57-51-37-400-004):


- for the left wing, install 575BB
- for the right wing, install 675BB.

(3) Remove the access platform(s).

Subtask 27-64-42-865-057

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-42-710-051

D. Operational Test

(1) Do an operational test of the spoiler 2 (Ref. TASK 27-64-00-710-001).



EFF :
ALL
 27-64-42



AIJ




Page 430
Feb 01/11

Subtask 27-64-42-942-054

E. Removal of Equipment

(1) Remove the SAFETY BARRIER(S).

(2) Remove the warning notice(s).

R
R

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-42



AIJ




Page 431
Feb 01/11

SPOILER 2 - INSPECTION/CHECK
____________________________
TASK 27-64-42-200-001
Inspection/Check of the Spoiler 2
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Inspection/check of the spoiler 2 after too much free movement is found.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice



EFF :
ALL
 27-64-42


R 
AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-64-42-000-001
27-64-42-400-001
R

Removal of the Spoiler 2


Installation of the Spoiler 2

**ON A/C 001-008,


27-64-42-991-003

**ON A/C 009-100,

27-64-42-991-003-A

**ON A/C ALL

Fig. 601

Fig. 601A

3. __________
Job Set-up
Subtask 27-64-42-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-64-42-010-051
B. Get Access
(1) Remove the spoiler 2 (Ref. TASK 27-64-42-000-001).
4. Procedure
_________
R

**ON A/C 001-008,


(Ref. Fig. 601/TASK 27-64-42-991-003)



EFF :
ALL
 27-64-42



AIJ




Page 602
Feb 01/11

Spoiler 2
Figure 601/TASK 27-64-42-991-003


R
EFF :
001-008,
 27-64-42



AIJ




Page 603
Feb 01/11

**ON A/C 009-100,

R
R

(Ref. Fig. 601A/TASK 27-64-42-991-003-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-42-220-051
A. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| B
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42



AIJ




Page 604
Feb 01/11

R
R

Spoiler 2
Figure 601A/TASK 27-64-42-991-003-A



R
EFF :
009-100,
 27-64-42



AIJ




Page 605
Feb 01/11

Subtask 27-64-42-220-052
B. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-053
C. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-42


R 
AIJ




Page 606
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-054
D. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42


R 
AIJ




Page 607
Feb 01/11

Subtask 27-64-42-220-055
E. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 5
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-056
F. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-42


R 
AIJ




Page 608
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 5
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| C
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 6
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-057
G. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 2
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 1
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42


R 
AIJ




Page 609
Feb 01/11

Subtask 27-64-42-220-058
H. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 3
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 2
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-059
J. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-42


R 
AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.164 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8725) |
|
|
|
|
|
| 0.008 | 0.041 |
|
| 0.090 |
|
|
|
| (0.0003)| (0.0016)|
|
|(0.0035)|
| D
| 22.213 | 22.225 |
|
|
| 22.254 |
|
| ID 6
|(0.8745) |(0.8750) |
|
|
|(0.8761) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-065
K. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 4
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 5
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42


R 
AIJ




Page 611
Feb 01/11

Subtask 27-64-42-220-066
L. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 4
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-060
M. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-42


R 
AIJ




Page 612
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-061
N. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42


R 
AIJ




Page 613
Feb 01/11

Subtask 27-64-42-220-062
P. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-063
Q. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-42


R 
AIJ




Page 614
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 4
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| E
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-42-220-064
R. Dimensions of the Spoiler 2
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| F
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-42



AIJ




Page 615
Feb 01/11

5. Close-up
________
Subtask 27-64-42-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the spoiler 2 (Ref. TASK 27-64-42-400-001).
Subtask 27-64-42-942-053
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-42



AIJ




Page 616
Feb 01/11

SPOILER 3 - REMOVAL/INSTALLATION
________________________________
TASK 27-64-43-000-001
Removal of the Spoiler 3
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 WARNING NOTICE(S)



EFF :
ALL
 27-64-43



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
27-64-44-000-001
57-51-37-000-004
27-64-43-991-001

Extension-Retraction of the Spoilers for Maintenance


Removal of the Spoiler 4
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

R
3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-43-991-001)
Subtask 27-64-43-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

R
R

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.
Subtask 27-64-43-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the spoiler 3 (Ref. TASK 27-60-00-866-002).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.
(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-43



AIJ




Page 402
Aug 01/11

Spoiler 3 - Actuator Detail and Clearances


Figure 401/TASK 27-64-43-991-001



EFF :
ALL
 27-64-43



AIJ




Page 403
Aug 01/11

Subtask 27-64-43-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-43-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panel:
- for the left wing 575DB
- for the right wing 675DB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-004):
- for the left wing remove 575DB
- for the right wing remove 675DB.
4. Procedure
_________

R
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-43-020-050
A. Removal of the Spoiler 3
(1) Remove the nuts (49), the washers (50) and the bolts (47) to
disconnect the bonding straps (48) from each end of the spoiler 3.
(2) Remove the nuts (21), (30) and (46) and the locking plates (22), (31)
and (45).



EFF :
ALL
 27-64-43



AIJ




Page 404
Aug 01/11

(3) Remove the spacer (20) and the bolt (29).


(4) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (28) and (51) from the locking
caps (27) and (52).
(d) Remove and discard the cotter pins (37) and (38) from the locking
caps (36) and (39).
(e) Remove the locking caps (27), (52), (36) and (39).
(f) Remove the nuts (26), (53), (35) and (40).
(g) Remove the washers (25), (54), (34) and (41).
(5) Do not remove the hinge pins (23), (32) and (44).
(6) Prepare the spoiler 3 for removal:
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 3 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8) and carefully lower the
actuator.
(7) Remove the sliding bush (5) and the flanged bush (7) from the spoiler
fitting.
(8) Leave the supports below the spoiler and remove the hinge pins (23),
(32) and (44). Collect the sliding bushes (24), (33), (42) and (43).
(9) Pull the spoiler 3 rearwards and inboard to disengage it from the
hinge shaft and remove it from the aircraft.
(10) If it is necessary to remove the hinge shaft:
- remove the spoiler 4 (Ref. TASK 27-64-44-000-001)
- remove the hinge shaft.



EFF :
ALL
 27-64-43



AIJ




Page 405
Aug 01/11

TASK 27-64-43-400-001
Installation of the Spoiler 3
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific

1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

No specific

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
2 KEY-SPOILER MAINTENANCE
2 KEY-SPOILER MAINTENANCE

R
98D27603002000
98D27603002001



R
EFF :
ALL
 27-64-43



AIJ




Page 406
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
28
28
37
37
38
38
51
51

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05



R
EFF :
ALL
 27-64-43



AIJ




03B-020
13 -090
13B-090
13 -270
13B-270
13 -270
13B-270
13 -170
13B-170

Page 407
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
27-64-44-400-001
29-10-00-863-003
57-51-37-400-004
R

ASRM 57-70-00-201
27-64-43-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Installation of the Spoiler 4
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

**ON A/C 001-008,


27-64-43-991-002

Fig. 402

**ON A/C 009-100,


27-64-43-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-43-991-001)
Subtask 27-64-43-941-054
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.



EFF :
ALL
 27-64-43



AIJ




Page 408
Aug 01/11

R
R

(3) Make sure that the WARNING NOTICE(S) to tell persons not to operate
the flight controls is in position.
Subtask 27-64-43-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(2) Make sure that spoiler 3 is extended (Ref. TASK 27-60-00-866-002).
(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-43-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-43-991-001)
**ON A/C 001-008,
(Ref. Fig. 402/TASK 27-64-43-991-002)
**ON A/C 009-100,
(Ref. Fig. 402A/TASK 27-64-43-991-002-A)



EFF :
ALL
 27-64-43



AIJ




Page 409
Aug 01/11

Spoiler 3 - Hinge Details


Figure 402/TASK 27-64-43-991-002



R
EFF :
001-008,
 27-64-43



AIJ




Page 410
Aug 01/11

Spoiler 3 - Hinge Details


Figure 402A/TASK 27-64-43-991-002-A



R
EFF :
009-100,
 27-64-43



AIJ




Page 411
Aug 01/11

**ON A/C ALL


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-43-560-050
A. Preparation of a Replacement Component
R

(1) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.
Subtask 27-64-43-420-052
B. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) If the hinge shaft is removed:
- install the hinge shaft in the hinge fitting
- install the spoiler 4 (Ref. TASK 27-64-44-400-001).



EFF :
ALL
 27-64-43



AIJ




Page 412
Aug 01/11

(5) Apply SPECIAL MATERIALS (Material No. 05-002) to the:


- hinges on the rear spar
- hinges on the spoiler
- sliding bushes (5), (24), (33), (42) and (43)
- flanged bush (7)
- hinge pins (6), (23), (32) and (44)
- hinge shaft.
Subtask 27-64-43-916-050
C. Application of Special Materials
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo control spherical
____
bearing.
Subtask 27-64-43-420-051
D. Installation of the Spoiler 3

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the sliding bushes (24), (33), (42) and (43) in the rear spar
fittings.

R
R

(2) Make sure the spoiler 3 is held on supports. Push the spoiler forward
and outboard to engage it on the hinge shaft.
(3) Install the hinge pins (23), (32) and (44) through the rear spar
fittings and the spoiler fittings.
(4) Install the flanged bush (7) in the spoiler fitting.



EFF :
ALL
 27-64-43



AIJ




Page 413
Aug 01/11

(5) Lift the spoiler actuator and hold it in the correct position so that
the greaser on the eye-end (8) points down.
(6) Install the hinge pin (6) through the flanged bush (7) and the
actuator eye-end (8).
R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.

R
R
R
R

Measure the dimension T. The dimension T must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.
(7) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.
(8) Install the items that follow:
(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (25) and (54) and the nuts (26) and (53) on
the hinge pin (23) and the hinge shaft.
(d) Install the washers (34) and (41) and the nuts (35) and (40) on
the hinge pins (32) and (44).

R
R

(e) TORQUE the nuts (26) and (53) to between 3.5 and 4.0 m.daN (25.81
and 29.49 lbf.ft).
(f) TORQUE the nuts (35) and (40) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (27) and (52) on the nuts (26) and (53).
(i) Install the locking caps (36) and (39) on the nuts (35) and (40).
(9) Safety the items that follow:
- the locking cap (2) with the new cotter pin (1)
- the locking cap (27) with the new cotter pin (28)
- the locking cap (36) with the new cotter pin (37)
- the locking cap (39) with the new cotter pin (38)



EFF :
ALL
 27-64-43



AIJ




Page 414
Aug 01/11

- the locking cap (52) with the new cotter pin (51).
(10) Clean the interfaces of the bolt (29) and the spacer (20) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).
R
R

(11) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (29) and the
spacer (20).
(12) Install the bolt (29) and the spacer (20).
(13) Install the locking plates (22), (31) and (45) and then attach them
with the nuts (21), (30) and (46).
(14) TORQUE the nuts (21), (30) and (46) to between 0.25 and 0.30 m.daN
(22.12 and 26.54 lbf.in).
(15) Attach the bonding straps (48) to each end of the spoiler with the
bolts (47), the washers (50) and the nuts (49) (Ref. TASK 20-28-00912-004).
Subtask 27-64-43-916-051
E. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


washers (4), (25), (34) and (41)
nuts (3), (26), (35) and (40)
locking caps (2), (27), (36) and (39)
cotter pins (1), (28), (37) and (38)
hinge pins (6), (23), (32) and (44).

Subtask 27-64-43-860-051
F. Aircraft Maintenance Configuration
(1) Retract the spoiler 3 (Ref. TASK 27-60-00-866-002).
R
R

(2) On the servo-control, turn the KEY-SPOILER MAINTENANCE or the KEYSPOILER MAINTENANCE in the maintenance device to the operation
position and then remove it.



EFF :
ALL
 27-64-43



AIJ




Page 415
Aug 01/11

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
Subtask 27-64-43-820-051
G. Clearance Checks
R
R

(1) Make sure that the clearance X is between 0 mm (0.0000 in.) and 0.5
mm (0.0196 in.). Adjust the seals if it is necessary.

R
R

(2) Make sure that the clearance Y is between 16.0 mm (0.6299 in.) and
20.0 mm (0.7874 in.).

R
R
R
R
R
R
R

(3) Make sure that:


- when there is no step condition, the value of the clearance Z is
between 1.63 mm (0.0641 in.) and 2.82 mm (0.1110 in.)
- when a step condition exists, the value of the clearance Z is
between 0.7 mm (0.0275 in.) and 3.83 mm (0.1507 in.)
The spoiler and the trailing edge must make a continuous surface. The
seal must touch the trailing edge along its full length.
(4) Pressurize the Blue Hydraulic system (Ref. TASK 29-10-00-863-003).

R
R

(5) Adjust the spoiler to give the dimension U between the spoiler and
the flap (Ref. TASK 27-64-00-820-001).
Subtask 27-64-43-410-050
H. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels (Ref. TASK 57-51-37-400-004):
- for the left wing, install 575DB
- for the right wing, install 675DB.
(3) Remove the access platform(s).



EFF :
ALL
 27-64-43



AIJ




Page 416
Aug 01/11

Subtask 27-64-43-865-054
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-43-710-050
K. Operational Test
(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).
5. Close-up
________
Subtask 27-64-43-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-43



AIJ




Page 417
Aug 01/11

TASK 27-64-43-000-002

Removal of the Link-Spoiler 3

R
R
R
R
R
R

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
AR WARNING NOTICE(S)



EFF :
ALL
 27-64-43



AIJ




Page 418
Aug 01/11

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

27-60-00-866-002
57-51-37-000-004

3. __________
Job Set-up

Subtask 27-64-43-941-055

A. Safety Precautions

27-64-43-991-005

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Put the safety barriers in position.

R
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

R
R

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.

Subtask 27-64-43-860-053

B. Aircraft Maintenance Configuration

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

(1) Extend the spoiler 3 (Ref. TASK 27-60-00-866-002).

R
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.

R
R

(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-43



AIJ




Page 419
Aug 01/11

Subtask 27-64-43-865-055

C. Open, safety and tag this(these) circuit breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-43-010-053

D. Get Access

R
R
R
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panel:
- for the left wing 575DB
- for the right wing 675DB.

R
R
R

(2) Remove the access panels (Ref. TASK 57-51-37-000-004):


- for the left wing remove 575DB
- for the right wing remove 675DB.

4. Procedure
_________

Subtask 27-64-43-020-051

A. Removal of the Link-Spoiler 3

R
R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING


_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

R
R

(Ref. Fig. 403/TASK 27-64-43-991-005)

(1) Remove the nut (26) and the locking plate (27).

(2) Remove the spacer (25) and the bolt (24).



EFF :
ALL
 27-64-43



AIJ




Page 420
Aug 01/11

R
R

Link-Spoiler 3
Figure 403/TASK 27-64-43-991-005



EFF :
ALL
 27-64-43



AIJ




Page 421
Aug 01/11

R
R

(3) Remove and discard the cotter pins (6) and (23) from the locking caps
(5) and (22).

(4) Remove the locking caps (5) and (22).

(5) Remove the nuts (4) and (21) and the washers (3) and (20).

(6) Remove the hinge pin (28) and the sliding bush (19).

R
R

(7) Remove and discard the cotter pins (11) and (16) from the nuts (10)
and (15).

(8) Remove the nuts (10) and (15) and the washers (9) and (14).

(9) Remove the bolts (7) and (12) and the bushes (8) and (13).

(10) Remove the bushes (1) and (17) and the links-spoiler 3 (2) and (18).



EFF :
ALL
 27-64-43



AIJ




Page 422
Aug 01/11

TASK 27-64-43-400-002

Installation of the Link-Spoiler 3

R
R

WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-64-43



AIJ




Page 423
Aug 01/11

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Material No. 04-004


Material No. 09-018B
Material No. 09-019B
Material No. 11-026
Material No. 15-009
Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
F
AIMS 09-08-003 TYPE III
CORROSION PREVENTIVE TEMPORY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R
R
R

6
6
11
16
23
23

cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
57-73-21
57-73-21
27-64-05
27-64-05



EFF :
ALL
 27-64-43



AIJ




13 -170
13B-170
01M-190
01M-190
13 -090
13B-090

Page 424
Aug 01/11

D. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R

27-60-00-866-002
27-64-00-200-001

3. __________
Job Set-up

Subtask 27-64-43-941-056

A. Safety Precautions

27-64-00-710-001
57-51-37-000-004
57-51-37-400-004
27-64-43-991-005

Extension-Retraction of the Spoilers for Maintenance


Check of the Spoilers Servo Controls and Hinge
Bearings for Excessive Play and Condition
Operational Test of the Spoiler Hydraulic Actuation
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

R
R

(3) Make sure that the WARNING NOTICE(S) to tell persons not to operate
the flight controls is in position.

Subtask 27-64-43-860-054

B. Aircraft Maintenance Configuration

R
R

(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.

(2) Make sure that spoiler 3 is extended (Ref. TASK 27-60-00-866-002).

R
R

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-43



AIJ




Page 425
Aug 01/11

R
R
R
R

(4) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is below the
applicable access panel:
- for the left wing: 575DB
- for the right wing: 675DB.

R
R
R
R

(5) Make sure that the applicable access panel (Ref. TASK 57-51-37-000004) is removed:
- for the left wing: 575DB
- for the right wing: 675DB.

Subtask 27-64-43-865-056

R
R

C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

4. Procedure
_________

Subtask 27-64-43-420-053

A. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R

(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.

(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-64-43



AIJ




Page 426
Aug 01/11

R
R
R
R
R
R

(4) Apply COMMON GREASE (Material No. 04-004) to the:


- hinges on the rear spar,
- hinges on the spoiler,
- sliding bush (19),
- hinge pin (28).
Subtask 27-64-43-420-054

B. Installation of the Link-Spoiler 3

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

(Ref. Fig. 403/TASK 27-64-43-991-005)

R
R

(1) Put the bushes (1) and (17) and the end of the links-spoiler 3 (2)
and (18) in position on the spoiler brackets.

(2) Install the bushes (8) and (13) and the bolts (7) and (12).

(3) Install the washers (9) and (14) and the nuts (10) and (15).

R
R

(4) TORQUE the nuts (10) and (15) to between 1.13 and 1.36 m.daN (99.99
and 120.35 lbf.in).

R
R

(5) Safety the nuts (10) with the new cotter pin (11) and (15) with the
new cotter pin (16).

R
R

(6) Put the links-spoiler 3 (2) and (18) and the sliding bush (19) in
position through the rear spar fittings and the spoiler fittings.

(7) Install the hinge pin (28) through the rear spar fittings.

(8) Install the washers (3) and (20) and the nuts (4) and (21).

R
R

(9) TORQUE the nuts (4) and (21) to between 3.5 and 4.0 m.daN (25.81 and
29.49 lbf.ft).

(10) Install the locking caps (5) and (22) on the nuts (4) and (21).

R
R

(11) Safety the locking caps (5) with the new cotter pin (6) and (22) with
the new cotter pin (23).

R
R
R

(12) Clean the interfaces of the bolt (24) and the spacer (25) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-64-43



AIJ




Page 427
Aug 01/11

R
R
R

(13) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (24) and the
spacer (25).

(14) Install the bolt (24).

(15) Install the spacer (25), the locking plate (27) and the nut (26).

R
R

(16) TORQUE the nut (26) to between 0.25 and 0.30 m.daN (22.12 and 26.54
lbf.in).

Subtask 27-64-43-220-067

R
R

C. Check of the Spoilers Servo Controls and Hinge Bearings for Excessive
Play and Condition

R
R
R

(1) Do a check of the spoilers servo controls and hinge bearings for
excessive play and condition (Ref. TASK 27-64-00-200-001).
Subtask 27-64-43-916-052

D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R
R
R
R
R
R

(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-009) to:


cotter pins (6) and (23),
locking caps (5) and (22),
nuts (4) and (21),
washers (3) and (20),
hinge pin (28),
nut (26),
bolt (24).

5. Close-up
________

Subtask 27-64-43-860-055

A. Aircraft Maintenance Configuration

(1) Retract the spoiler 3 (Ref. TASK 27-60-00-866-002).

R
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.



EFF :
ALL
 27-64-43



AIJ




Page 428
Aug 01/11

Subtask 27-64-43-410-052

B. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) Install the access panels (Ref. TASK 57-51-37-400-004):


- for the left wing, install 575DB
- for the right wing, install 675DB.

(3) Remove the access platform(s).

Subtask 27-64-43-865-057

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-43-710-051

D. Operational Test

R
R

(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).


Subtask 27-64-43-942-053

E. Removal of Equipment

(1) Remove the safety barriers.

(2) Remove the warning notice(s).

R
R

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-43



AIJ




Page 429
Aug 01/11

SPOILER 3 - INSPECTION/CHECK
____________________________
TASK 27-64-43-200-001
Inspection/check of the Spoiler 3
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement is more than that in TASK 27-64-00-200-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice



EFF :
ALL
 27-64-43


R 
AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-64-43-000-001
27-64-43-400-001
R

Removal of the Spoiler 3


Installation of the Spoiler 3

**ON A/C 001-008,


27-64-43-991-003

**ON A/C 009-100,

27-64-43-991-003-A

**ON A/C ALL

Fig. 601

Fig. 601A

3. __________
Job Set-up
Subtask 27-64-43-941-053
A. Safety Precautions
(1) Put the safety barriers are in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-64-43-010-051
B. Get Access
(1) Remove the spoiler 3 (Ref. TASK 27-64-43-000-001).
4. Procedure
_________
R

**ON A/C 001-008,


(Ref. Fig. 601/TASK 27-64-43-991-003)



EFF :
ALL
 27-64-43



AIJ




Page 602
Feb 01/11

Spoiler 3
Figure 601/TASK 27-64-43-991-003


R
EFF :
001-008,
 27-64-43



AIJ




Page 603
Feb 01/11

**ON A/C 009-100,

R
R

(Ref. Fig. 601A/TASK 27-64-43-991-003-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-43-220-051
A. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| B
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43



AIJ




Page 604
Feb 01/11

R
R

Spoiler 3
Figure 601A/TASK 27-64-43-991-003-A



R
EFF :
009-100,
 27-64-43



AIJ




Page 605
Feb 01/11

Subtask 27-64-43-220-052
B. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-053
C. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-43


R 
AIJ




Page 606
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-054
D. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43


R 
AIJ




Page 607
Feb 01/11

Subtask 27-64-43-220-055
E. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 5
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-056
F. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-43


R 
AIJ




Page 608
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 5
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| C
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 6
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-057
G. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 2
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 1
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43


R 
AIJ




Page 609
Feb 01/11

Subtask 27-64-43-220-058
H. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 3
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 2
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-059
J. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-43


R 
AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.164 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8725) |
|
|
|
|
|
| 0.008 | 0.041 |
|
| 0.090 |
|
|
|
| (0.0003)| (0.0016)|
|
|(0.0035)|
| D
| 22.213 | 22.225 |
|
|
| 22.254 |
|
| ID 6
|(0.8745) |(0.8750) |
|
|
|(0.8761) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-065
K. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 4
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 5
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43


R 
AIJ




Page 611
Feb 01/11

Subtask 27-64-43-220-066
L. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 4
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-060
M. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-43


R 
AIJ




Page 612
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3110) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| E
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-061
N. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| F
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43


R 
AIJ




Page 613
Feb 01/11

Subtask 27-64-43-220-062
P. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| F
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-063
Q. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-43


R 
AIJ




Page 614
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| F
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-43-220-064
R. Dimensions of the Spoiler 3
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 4
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| F
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-43



AIJ




Page 615
Feb 01/11

5. Close-up
________
Subtask 27-64-43-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the spoiler 3 (Ref. TASK 27-64-43-400-001).
Subtask 27-64-43-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-43



AIJ




Page 616
Feb 01/11

SPOILER 4 - REMOVAL/INSTALLATION
________________________________
TASK 27-64-44-000-001
Removal of the Spoiler 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 WARNING NOTICE(S)



EFF :
ALL
 27-64-44



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
27-64-43-000-001
57-51-37-000-004
27-64-44-991-001

Extension-Retraction of the Spoilers for Maintenance


Removal of the Spoiler 3
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401

**ON A/C 001-008,


27-64-44-991-002

Fig. 402

**ON A/C 009-100,


27-64-44-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-44-991-001)
Subtask 27-64-44-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.



EFF :
ALL
 27-64-44



AIJ




Page 402
Aug 01/11

Spoiler 4 - Actuator Detail and Clearances


Figure 401/TASK 27-64-44-991-001



EFF :
ALL
 27-64-44



AIJ




Page 403
Aug 01/11

Subtask 27-64-44-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the spoiler 4 (Ref. TASK 27-60-00-866-002).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.
(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-44-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-44-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panels:
- for the left wing 575EB
- for the right wing 675EB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-004):
- for the left wing remove 575EB
- for the right wing remove 675EB.



EFF :
ALL
 27-64-44



AIJ




Page 404
Aug 01/11

4. Procedure
_________
R
R

(Ref. Fig. 401/TASK 27-64-44-991-001)


**ON A/C 001-008,

R
R

(Ref. Fig. 402/TASK 27-64-44-991-002)


**ON A/C 009-100,

R
R

(Ref. Fig. 402A/TASK 27-64-44-991-002-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-44-020-050
A. Removal of the Spoiler 4
(1) Remove the nuts (46), the washers (47) and the bolts (44) to
disconnect the bonding straps (45) from each end of the spoiler 4.
(2) Remove the nuts (27), (43) and (56) and the locking plates (28), (42)
and (55).
(3) Remove the spacer (57) and the bolt (48).
(4) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (26) and (49) from the locking
caps (25) and (50).



EFF :
ALL
 27-64-44



AIJ




Page 405
Feb 01/11

Spoiler 4 - Hinge Detail


Figure 402/TASK 27-64-44-991-002



EFF :
001-008,
 27-64-44



AIJ




Page 406
Aug 01/11

Spoiler 4 - Hinge Detail


Figure 402A/TASK 27-64-44-991-002-A



EFF :
009-100,
 27-64-44



AIJ




Page 407
Aug 01/11

(d) Remove and discard the cotter pins (34) and (35) from the locking
caps (33) and (36).
(e) Remove the locking caps (25), (50), (33) and (36).
(f) Remove the nuts (24), (51), (32) and (37).
(g) Remove the washers (23), (52), (31) and (38).
(5) Do not remove the hinge pins (29), (41) and (54).
(6) Prepare the spoiler 4 for removal:
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 4 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8) and carefully lower the
actuator.
(7) Remove the sliding bush (5) and the flanged bush (7).
(8) Leave the supports in position below the spoiler and remove the hinge
pins (29), (41) and (54). Collect the sliding bushes (30), (39), (40)
and (53).
(9) Pull the spoiler rearwards and outboard to disengage it from the
shaft (21) and then remove it from the aircraft. Collect the spacer
(20).

R
R

(10) If it is necessary to remove the shaft (21):


- remove the spoiler 3 (Ref. TASK 27-64-43-000-001)
- remove the shaft (21) from the hinge fitting (22).



EFF :
ALL
 27-64-44



AIJ




Page 408
Aug 01/11

TASK 27-64-44-400-001
Installation of the Spoiler 4
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

R
No specific
98D27603002000

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
2 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-44



AIJ




Page 409
Aug 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27603002001

2 KEY-SPOILER MAINTENANCE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R

1
26
26
34
34
35
35
49
49

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05



EFF :
ALL
 27-64-44



AIJ




04E-020
14 -180
14B-180
14 -300
14B-300
14 -300
14B-300
14 -100
14B-100

Page 410
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004

27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
27-64-43-400-001
29-10-00-863-002
57-51-37-400-004

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Installation of the Spoiler 3
Pressurize the Yellow Hydraulic System
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

ASRM 57-70-00-201
27-64-44-991-001

Fig. 401

**ON A/C 001-008,


27-64-44-991-002

Fig. 402

**ON A/C 009-100,


27-64-44-991-002-A

Fig. 402A

**ON A/C ALL


3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-44-991-001)
Subtask 27-64-44-941-055
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.



EFF :
ALL
 27-64-44



AIJ




Page 411
Aug 01/11

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-64-44-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap and slat control lever on panel 114VU.
(2) Make sure that the spoiler 4 is extended (Ref. TASK 27-60-00-866002).
(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-44-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-44-991-001)
**ON A/C 001-008,
(Ref. Fig. 402/TASK 27-64-44-991-002)
**ON A/C 009-100,
(Ref. Fig. 402A/TASK 27-64-44-991-002-A)



EFF :
ALL
 27-64-44



AIJ




Page 412
Aug 01/11

**ON A/C ALL


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-44-560-050
A. Preparation of a Replacement Component
R

(1) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.
Subtask 27-64-44-420-051
B. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
_______
MATERIAL.
THIS MATERIAL IS DANGEROUS.

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) If the shaft (21) is removed:
- install the shaft (21) in the hinge fitting (22)
- attach the spoiler 3 (Ref. TASK 27-64-43-400-001).



EFF :
ALL
 27-64-44



AIJ




Page 413
Aug 01/11

(5) Apply SPECIAL MATERIALS (Material No. 05-002) to the:


- hinges on the rear spar
- hinges on the spoiler
- sliding bushes (5), (30), (39), (40) and (53)
- flanged bush (7)
- hinge pins (6), (29), (41) and (54)
- shaft (21).
Subtask 27-64-44-916-050
C. Application of Special Materials
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo control spherical
____
bearing.
Subtask 27-64-44-420-050
D. Installation of the Spoiler 4

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the spacer (20) on the shaft (21).
(2) Install the sliding bushes (30), (39), (40) and (53).

R
R

(3) Make sure the spoiler 4 is held on supports. Push the spoiler inboard
and forward to engage it on the shaft (21).
(4) Install the hinge pins (29), (41) and (54) through the rear spar
fittings and the spoiler fittings.
(5) Install the flanged bush (7) in the spoiler fitting.



EFF :
ALL
 27-64-44



AIJ




Page 414
Aug 01/11

(6) Lift the spoiler actuator and support it in the correct position so
that the greaser on the actuator eye-end (8) points down.
(7) Install the hinge pin (6) through the flanged bush (7) and the
actuator eye-end (8).
R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.

R
R
R
R

(8) Measure the dimension T. The dimension must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.

(9) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.

(10) Install the items that follow:


(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (23) and (52) and the nuts (24) and (51) on
the shaft (21) and the hinge pin (54).
(d) Install the washers (31) and (38) and the nuts (32) and (37) on
the hinge pins (29) and (41).

R
R

(e) TORQUE the nuts (24) and (51) to between 3.5 and 4.0 m.daN (25.81
and 29.49 lbf.ft).
(f) TORQUE the nuts (32) and (37) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (25) and (50) on the nuts (24) and (51).
(i) Install the locking caps (33) and (36) on the nuts (32) and (37).

R
R

(11) Safety the items that follow:


- the locking cap (2) with the new cotter pin (1)
- the locking cap (25) with the new cotter pin (26)
- the locking cap (33) with the new cotter pin (34)
- the locking cap (36) with the new cotter pin (35)



EFF :
ALL
 27-64-44



AIJ




Page 415
Aug 01/11

- the locking cap (50) with the new cotter pin (49).
R

(12) Clean the interfaces of the bolt (48) and the spacer (57) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

R
R

(13) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (48) and the
spacer (57).

(14) Install the bolt (48) and the spacer (57).

(15) Install the locking plates (28), (42) and (55) and attach them with
the nuts (27), (43) and (56).

(16) TORQUE the nuts (27), (43) and (56) to between 0.25 and 0.30 m.daN
(22.12 and 26.54 lbf.in).

(17) Attach the bonding straps (45) to each end of the spoiler with the
bolts (44), the washers (47) and the nuts (46) (Ref. TASK 20-28-00912-004).
Subtask 27-64-44-916-051
E. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply
- the
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (1), (26), (34), (35) and (49)
locking caps (2), (25), (33), (36) and (50)
nuts (3), (24), (32), (37) and (51)
washers (4), (23), (31), (38) and (52)
hinge pins (6), (29), (41) and (54)
flange of the shaft (21)
nuts (27), (43) and (56)
bolt (48).



EFF :
ALL
 27-64-44



AIJ




Page 416
Aug 01/11

Subtask 27-64-44-860-051
F. Aircraft Maintenance Configuration
(1) Retract spoiler 4 (Ref. TASK 27-60-00-866-002).
R
R

(2) On the servo-control, turn the KEY-SPOILER MAINTENANCE or the KEYSPOILER MAINTENANCE on the maintenance device to the operation
position and then remove it.
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap
and slat control lever on panel 114VU.
Subtask 27-64-44-865-052
G. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-64-44-820-051
H. Clearance Checks

(1) Make sure that the clearance X is between 16 mm (0.6299 in.) and 20
mm (0.7874 in.).

R
R

(2) Make sure that the clearance Y is between 0 mm (0.0000 in.) and
0.50 mm (0.0196 in.). Adjust the seals if it is necessary.

R
R
R
R
R
R
R

(3) Make sure that:


- when there is no step condition, the value of the clearance Z is
between 1.63 mm (0.0641 in.) and 2.82 mm (0.1110 in.)
- when a step condition exists, the value of the clearance Z is
between 0.7 mm (0.0275 in.) and 3.83 mm (0.1507 in.).
The spoiler and the structure must make a continuous surface. The
seal must touch the trailing edge structure along its full length.
(4) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).

R
R

(5) Adjust the spoiler to give the dimension U between the spoiler and
the flap (Ref. TASK 27-64-00-820-001).



EFF :
ALL
 27-64-44



AIJ




Page 417
Aug 01/11

Subtask 27-64-44-410-050
J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels (Ref. TASK 57-51-37-400-004):
- for the left wing, install 575EB
- for the right wing, install 675EB.
(3) Remove the access platform(s).
Subtask 27-64-44-865-053
K. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-44-710-050
L. Operational Test
(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).
5. Close-up
________
Subtask 27-64-44-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-44



AIJ




Page 418
Aug 01/11

TASK 27-64-44-000-002

Removal of the Link-Spoiler 4

R
R
R
R
R
R

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
AR WARNING NOTICE(S)



EFF :
ALL
 27-64-44



AIJ




Page 419
Aug 01/11

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

27-60-00-866-002
57-51-37-000-004

3. __________
Job Set-up

Subtask 27-64-44-941-057

A. Safety Precautions

27-64-44-991-004

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Put the safety barriers in position.

R
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

R
R

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.

Subtask 27-64-44-860-053

B. Aircraft Maintenance Configuration

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

(1) Extend the spoiler 4 (Ref. TASK 27-60-00-866-002).

R
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.

R
R

(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-44



AIJ




Page 420
Aug 01/11

Subtask 27-64-44-865-055

C. Open, safety and tag this(these) circuit breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-44-010-053

D. Get Access

R
R
R
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panels:
- for the left wing 575EB
- for the right wing 675EB.

R
R
R

(2) Remove the access panels (Ref. TASK 57-51-37-000-004):


- for the left wing remove 575EB
- for the right wing remove 675EB.

4. Procedure
_________

Subtask 27-64-44-020-051

A. Removal of the Link-Spoiler 4

R
R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING


_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

(Ref. Fig. 403/TASK 27-64-44-991-004)

(1) Remove the nut (22) and the locking plate (21).

(2) Remove the spacer (23) and the bolt (24).

R
R

(3) Remove and discard the cotter pins (11) and (25) from the locking
caps (10) and (26).



EFF :
ALL
 27-64-44



AIJ




Page 421
Aug 01/11

R
R

Link-Spoiler 4
Figure 403/TASK 27-64-44-991-004



EFF :
ALL
 27-64-44



AIJ




Page 422
Aug 01/11

(4) Remove the locking caps (10) and (26).

(5) Remove the nuts (9) and (27) and the washers (8) and (28).

(6) Remove the hinge pin (20) and the sliding bush (29).

R
R

(7) Remove and discard the cotter pins (5) and (13) from the nuts (4) and
(14).

(8) Remove the nuts (4) and (14) and the washers (3) and (15).

(9) Remove the bolts (1) and (17) and the bushes (2) and (16).

(10) Remove the bushes (6) and (18) and the links-spoiler 4 (7) and (19).

(11) Collect the spacer (12).



EFF :
ALL
 27-64-44



AIJ




Page 423
Aug 01/11

TASK 27-64-44-400-002

Installation of the Link-Spoiler 4

R
R

WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-64-44



AIJ




Page 424
Aug 01/11

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Material No. 04-004


Material No. 09-018B
Material No. 09-019B
Material No. 11-026
Material No. 15-009
Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
F
AIMS 09-08-003 TYPE III
CORROSION PREVENTIVE TEMPORY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R
R
R

5
11
11
13
25
25

cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin

57-74-21
27-64-05
27-64-05
57-74-21
27-64-05
27-64-05



EFF :
ALL
 27-64-44



AIJ




01M-180
14 -180
14B-180
01M-180
14 -100
14B-100

Page 425
Aug 01/11

D. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R

27-60-00-866-002
27-64-00-200-001

3. __________
Job Set-up

Subtask 27-64-44-941-058

A. Safety Precautions

27-64-00-710-001
57-51-37-000-004
57-51-37-400-004
27-64-44-991-004

Extension-Retraction of the Spoilers for Maintenance


Check of the Spoilers Servo Controls and Hinge
Bearings for Excessive Play and Condition
Operational Test of the Spoiler Hydraulic Actuation
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.

R
R

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.

Subtask 27-64-44-860-054

B. Aircraft Maintenance Configuration

R
R

(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap and slat control lever on panel 114VU.

R
R

(2) Make sure that the spoiler 4 is extended (Ref. TASK 27-60-00-866002).

R
R

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-44



AIJ




Page 426
Aug 01/11

R
R
R
R

(4) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is below the
applicable access panel:
- for the left wing: 575EB
- for the right wing: 675EB.

R
R
R
R

(5) Make sure that the applicable access panel (Ref. TASK 57-51-37-000004) is removed:
- for the left wing: 575EB
- for the right wing: 675EB.

Subtask 27-64-44-865-056

R
R

C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

4. Procedure
_________

Subtask 27-64-44-420-052

A. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.

R
R
R

(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.

(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-64-44



AIJ




Page 427
Aug 01/11

R
R
R
R
R
R

(4) Apply COMMON GREASE (Material No. 04-004) to the:


- hinges on the rear spar,
- hinges on the spoiler,
- sliding bush (29),
- hinge pin (20).
Subtask 27-64-44-420-053

B. Installation of the Link-Spoiler 4

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

(Ref. Fig. 403/TASK 27-64-44-991-004)

R
R

(1) Put the bushes (6) and (18) and the end of the links-spoiler 4 (7)
and (19) in position on the spoiler brackets.

(2) Install the bushes (2) and (16) and the bolts (1) and (17).

(3) Install the washers (3) and (15) and the nuts (4) and (14).

R
R

(4) TORQUE the nuts (4) and (14) to between 1.13 and 1.36 m.daN (99.99
and 120.35 lbf.in).

R
R

(5) Safety the nuts (4) with the new cotter pin (5) and (14) with the new
cotter pin (13).

(6) Install the spacer (12).

R
R

(7) Put the links-spoiler 4 (7) and (19) and the sliding bush (29) in
position through the rear spar fittings and the spoiler fittings.

(8) Install the hinge pin (20) through the rear spar fitting.

(9) Install the washers (8) and (28) and the nuts (9) and (27).

R
R

(10) TORQUE the nuts (9) and (27) to between 3.5 and 4.0 m.daN (25.81 and
29.49 lbf.ft).

(11) Install the locking caps (10) and (26) on the nuts (9) and (27).

R
R

(12) Safety the locking cap (10) with the new cotter pin (11) and (26)
with the new cotter pin (25).



EFF :
ALL
 27-64-44



AIJ




Page 428
Aug 01/11

R
R
R

(13) Clean the interfaces of the bolt (24) and the spacer (23) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

R
R
R

(14) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (24) and the
spacer (23).

(15) Install the bolt (24).

(16) Install the spacer (23), the locking plate (21) and the nut (22).

R
R

(17) TORQUE the nut (22) to between 0.25 and 0.30 m.daN (22.12 and 26.54
lbf.in).

Subtask 27-64-44-220-067

R
R

C. Check of the Spoilers Servo Controls and Hinge Bearings for Excessive
Play and Condition

R
R
R

(1) Do a check of the spoilers servo controls and hinge bearings for
excessive play and condition (Ref. TASK 27-64-00-200-001).
Subtask 27-64-44-916-052

D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R
R
R
R
R
R

(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-009) to:


cotter pins (11) and (25),
locking caps (10) and (26),
nuts (9) and (27),
washers (8) and (28),
hinge pin (20),
nut (22),
bolt (24).



EFF :
ALL
 27-64-44



AIJ




Page 429
Aug 01/11

5. Close-up
________

Subtask 27-64-44-860-055

A. Aircraft Maintenance Configuration

(1) Retract spoiler 4 (Ref. TASK 27-60-00-866-002).

R
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap
and slat control lever on panel 114VU.

Subtask 27-64-44-410-052

B. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) Install the access panels (Ref. TASK 57-51-37-400-004):


- for the left wing, install 575EB
- for the right wing, install 675EB.

(3) Remove the access platform(s).

Subtask 27-64-44-865-057

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-44-710-051

D. Operational Test

(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).



EFF :
ALL
 27-64-44



AIJ




Page 430
Aug 01/11

Subtask 27-64-44-942-053

E. Removal of Equipment

(1) Remove the safety barriers.

(2) Remove the warning notice(s).

R
R

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-44



AIJ




Page 431
Aug 01/11

SPOILER 4 - INSPECTION/CHECK
____________________________
TASK 27-64-44-200-001
Inspection/Check of the Spoiler 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement is more than that in TASK 27-64-00-200-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice



EFF :
ALL
 27-64-44


R 
AIJ




Page 601
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-64-44-000-001
27-64-44-400-001
R

Removal of the Spoiler 4


Installation of the Spoiler 4

**ON A/C 001-008,


27-64-44-991-003

**ON A/C 009-100,

27-64-44-991-003-A

**ON A/C ALL

Fig. 601

Fig. 601A

3. __________
Job Set-up
Subtask 27-64-44-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-64-44-010-051
B. Get Access
(1) Remove the spoiler 4 (Ref. TASK 27-64-44-000-001).
4. Procedure
_________
R

**ON A/C 001-008,


(Ref. Fig. 601/TASK 27-64-44-991-003)



EFF :
ALL
 27-64-44



AIJ




Page 602
Feb 01/11

Spoiler 4
Figure 601/TASK 27-64-44-991-003


R
EFF :
001-008,
 27-64-44



AIJ




Page 603
Feb 01/11

**ON A/C 009-100,

R
R

(Ref. Fig. 601A/TASK 27-64-44-991-003-A)


**ON A/C ALL
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-44-220-051
A. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| B
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44



AIJ




Page 604
Feb 01/11

R
R

Spoiler 4
Figure 601A/TASK 27-64-44-991-003-A



R
EFF :
009-100,
 27-64-44



AIJ




Page 605
Feb 01/11

Subtask 27-64-44-220-052
B. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-053
C. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-44


R 
AIJ




Page 606
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-054
D. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44


R 
AIJ




Page 607
Feb 01/11

Subtask 27-64-44-220-055
E. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 5
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-056
F. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-44


R 
AIJ




Page 608
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 5
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| C
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 6
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-057
G. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 2
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 1
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44


R 
AIJ




Page 609
Feb 01/11

Subtask 27-64-44-220-058
H. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 3
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 2
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-059
J. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-44


R 
AIJ




Page 610
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.164 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8725) |
|
|
|
|
|
| 0.008 | 0.041 |
|
| 0.090 |
|
|
|
| (0.0003)| (0.0016)|
|
|(0.0035)|
| D
| 22.213 | 22.225 |
|
|
| 22.254 |
|
| ID 6
|(0.8745) |(0.8750) |
|
|
|(0.8761) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-065
K. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 4
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 5
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44


R 
AIJ




Page 611
Feb 01/11

Subtask 27-64-44-220-066
L. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 4
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-060
M. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-44


R 
AIJ




Page 612
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-061
N. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44


R 
AIJ




Page 613
Feb 01/11

Subtask 27-64-44-220-062
P. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-063
Q. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-44


R 
AIJ




Page 614
Feb 01/11

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 4
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| E
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-44-220-064
R. Dimensions of the Spoiler 4
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| F
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-44



AIJ




Page 615
Feb 01/11

5. Close-up
________
Subtask 27-64-44-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the spoiler 4 (Ref. TASK 27-64-44-400-001).
Subtask 27-64-44-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-44



AIJ




Page 616
Feb 01/11

SPOILER 5 - REMOVAL/INSTALLATION
________________________________
TASK 27-64-45-000-001
Removal of the Spoiler 5
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 WARNING NOTICE(S)



EFF :
ALL
 27-64-45



AIJ




Page 401
Aug 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-60-00-866-002
57-51-37-000-004
27-64-45-991-001
27-64-45-991-002

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-45-991-001)
Subtask 27-64-45-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.
Subtask 27-64-45-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the spoiler 5 (Ref. TASK 27-60-00-866-002).
(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.
(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-45



AIJ




Page 402
Aug 01/11

Spoiler 5 - Actuator Detail and Clearances


Figure 401/TASK 27-64-45-991-001



EFF :
ALL
 27-64-45



AIJ




Page 403
Aug 01/11

Subtask 27-64-45-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-45-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panels:
- for the left wing 575GB
- for the right wing 675GB.
(2) Remove the access panels (Ref. TASK 57-51-37-000-004):
- for the left wing, remove 575GB
- for the right wing, remove 675GB.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-45-991-001, 402/TASK 27-64-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-45-020-050
A. Removal of the Spoiler 5
(1) Remove the nuts (49), the washers (50) and the bolts (47) to
disconnect the bonding straps (48) from each end of the spoiler 5.
(2) Remove the nuts (21), (30) and (46) and the locking plates (22), (31)
and (45).



EFF :
ALL
 27-64-45



AIJ




Page 404
Aug 01/11

Spoiler 5 - Hinge Detail


Figure 402/TASK 27-64-45-991-002



EFF :
ALL
 27-64-45



AIJ




Page 405
Aug 01/11

(3) Remove the spacer (20) and the bolt (29).


(4) Remove the items that follow:
(a) Remove and discard the cotter pin (1) from the locking cap (2).
(b) Remove the locking cap (2), the nut (3) and the washer (4). Do
not remove the hinge pin (6).
(c) Remove and discard the cotter pins (28) and (51) from the locking
caps (27) and (52).
(d) Remove and discard the cotter pins (37) and (38) from the locking
caps (36) and (39).
(e) Remove the locking caps (27), (52), (36) and (39).
(f) Remove the nuts (26), (53), (35) and (40).
(g) Remove the washers (25), (54), (34) and (41).
(5) Do not remove the hinge pins (23), (32), (44) and (55).
(6) Prepare the spoiler 5 for removal:
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
R
R
R

(a) Put the spoiler 5 and the actuator on supports. Remove the hinge
pin (6) from the actuator eye-end (8). Carefully lower the
spoiler and remove the sliding bush (5) and the flanged bush (7).
(7) Continue to hold the spoiler, remove the hinge pins (23), (32), (44)
and (55) and collect the sliding bushes (24), (33), (42) and (43).
(8) Remove the spoiler from the wing.



EFF :
ALL
 27-64-45



AIJ




Page 406
Aug 01/11

TASK 27-64-45-400-001
Installation of the Spoiler 5
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

R
No specific
98D27603002000

Torque Wrench : range 0.67 to 13.50 m.daN


(4.94 to 99.57 lbf.ft)
2 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-45



AIJ




Page 407
Aug 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------98D27603002001

2 KEY-SPOILER MAINTENANCE

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
28
28
37
37
38
38
51
51

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05
27-64-05



EFF :
ALL
 27-64-45



AIJ




05E-020
15A-090
15B-090
15A-210
15B-210
15A-210
15B-210
15A-290
15B-290

Page 408
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004

27-60-00-866-002
27-64-00-710-001
27-64-00-820-001
29-10-00-863-001
57-51-37-400-004

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Adjustment of the Spoilers
Pressurize the Green Hydraulic System
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

ASRM 57-70-00-201
27-64-45-991-001
27-64-45-991-002

Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-45-991-001)
Subtask 27-64-45-941-054
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic system.

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.
Subtask 27-64-45-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
attached to the flap and slat control lever on panel 114VU.
(2) Make sure that the spoiler 5 is extended (Ref. TASK 27-60-00-866002).



EFF :
ALL
 27-64-45



AIJ




Page 409
Aug 01/11

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.
Subtask 27-64-45-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-45-991-001, 402/TASK 27-64-45-991-002)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-45-560-050
A. Preparation of a Replacement Component
R

(1) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.
Subtask 27-64-45-420-051
B. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-64-45



AIJ




Page 410
Aug 01/11

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Apply SPECIAL MATERIALS (Material No. 05-002) to the:
- hinges on the rear spar
- hinges on the spoiler
- sliding bushes (5), (24), (33), (42) and (43)
- flanged bush (7)
- hinge pins (6), (23), (32), (44) and (55).
Subtask 27-64-45-916-050
C. Application of Special Materials
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
eye-end (8) on the rounded surface only.
NOTE : Do not get Material 15-007 on the servo control spherical
____
bearing.
Subtask 27-64-45-420-050
D. Installation of the Spoiler 5

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Install the sliding bushes (24), (33), (42) and (43).

R
R

(2) Make sure there are supports below the spoiler 5 to hold it in the
correct position.
(3) Install the hinge pins (23), (32), (44) and (55) through the rear
spar fittings and the spoiler fittings.



EFF :
ALL
 27-64-45



AIJ




Page 411
Aug 01/11

(4) Install the flanged bush (7) in the spoiler fitting.


(5) Lift the spoiler actuator and hold it in the correct position so that
the greaser on the eye-end (8) points down.
(6) Install the hinge pin (6) through the flanged bush (7) and the
actuator eye-end (8).
R
R

NOTE : The short side of the hinge pin (6) head must be adjacent to
____
the projection on the spoiler attachment-bracket.

R
R
R
R

(7) Measure the dimension T. The dimension must be maximum 0.7 mm
(0.0275 in.).
If it is more than 0.7 mm (0.0275 in.) refer to (Ref. ASRM 57-70-00201) for the available repair.

(8) Install the sliding bush (5) on the hinge pin (6) and make sure that
it engages correctly in the spoiler fitting.

(9) Install the items that follow:


(a) Install the washer (4) and the nut (3) on the hinge pin (6).
(b) TORQUE the nut (3) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(c) Install the washers (25) and (54) and the nuts (26) and (53) on
the hinge pins (23) and (55).
(d) Install the washers (34) and (41) and the nuts (35) and (40) on
the hinge pins (32) and (44).

R
R

(e) TORQUE the nuts (26) and (53) to between 3.5 and 4.0 m.daN (25.81
and 29.49 lbf.ft).
(f) TORQUE the nuts (35) and (40) to between 5.5 and 6.0 m.daN (40.56
and 44.24 lbf.ft).
(g) Install the locking cap (2) on the nut (3).
(h) Install the locking caps (27) and (52) on the nuts (26) and (53).
(i) Install the locking caps (36) and (39) on the nuts (35) and (40).



EFF :
ALL
 27-64-45



AIJ




Page 412
Aug 01/11

(10) Safety the items that follow:


- the locking cap (2) with the new cotter pin (1)
- the locking cap (27) with the new cotter pin (28)
- the locking cap (36) with the new cotter pin (37)
- the locking cap (39) with the new cotter pin (38)
- the locking cap (52) with the new cotter pin (51).

(11) Clean the parts:


(a) Clean the interfaces of the bolt (29) and the spacer (20) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).

R
R

(12) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (29) and the
spacer (20).

(13) Install the bolt (29) and the spacer (20).

(14) Install the locking plates (22), (31) and (45) and attach them with
the nuts (21), (30) and (46).

(15) TORQUE the nuts (21), (30), and (46) to between 0.25 and 0.30 m.daN
(22.12 and 26.54 lbf.in).

(16) Attach the bonding strips (48) to each end of the spoiler with the
bolts (47), the washers (50) and the nuts (49) (Ref. TASK 20-28-00912-004).
Subtask 27-64-45-916-051
E. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


cotter pins (1), (28), (37), (38) and (51)
locking caps (2), (27), (36), (39) and (52)
nuts (3), (26), (35), (40) and (53)
washers (4), (25), (34), (41) and (54)
hinge pins (6), (23), (32), (44) and (55)
nuts (21), (30) and (46)
bolt (29).



EFF :
ALL
 27-64-45



AIJ




Page 413
Aug 01/11

Subtask 27-64-45-860-052
F. Aircraft Maintenance Configuration
(1) Retract the spoiler 5 (Ref. TASK 27-60-00-866-002).
R
R

(2) On the servo-control, turn the KEY-SPOILER MAINTENANCE or the KEYSPOILER MAINTENANCE on the maintenance device to the operation
position and then remove it.
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap
and slat control lever on panel 114VU.
Subtask 27-64-45-865-053
G. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-64-45-820-051
H. Clearance Checks

R
R

(1) Make sure that the clearances W and Y are between 0 mm (0.0000
in.) and 0.50 mm (0.0196 in.). Adjust the seals if it is necessary.

(2) Make sure that the clearance V is between 16 mm (0.6299 in.) and 20
mm (0.7874 in.).

(3) Make sure that the clearance X is between 5 mm (0.1968 in.) and 8
mm (0.3149 in.).

R
R
R
R
R
R
R

(4) Make sure that:


- when there is no step condition, the value of the clearance Z is
between 1.63 mm (0.0641 in.) and 2.82 mm (0.1110 in.)
- when a step condition exists, the value of the clearance Z is
between 0.7 mm (0.0275 in.) and 3.83 mm (0.1507 in.).
The spoiler and the structure must make a continuous surface. The
seal must touch the trailing edge structure along its full length.
(5) Pressurize the Green hydraulic system
(Ref. TASK 29-10-00-863-001).



EFF :
ALL
 27-64-45



AIJ




Page 414
Aug 01/11

R
R

(6) Adjust the spoiler to give the dimension U between the spoiler and
the flap (Ref. TASK 27-64-00-820-001).
Subtask 27-64-45-410-050
J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels (Ref. TASK 57-51-37-400-004):
- for the left wing, install 575GB
- for the right wing, install 675GB.
(3) To remove the safety collar
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(a) Remove the COLLAR-SAFETY, SPOILER.
(4) Remove the access platform(s).
Subtask 27-64-45-865-054
K. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
Subtask 27-64-45-710-050
L. Operational Test
(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).



EFF :
ALL
 27-64-45



AIJ




Page 415
Aug 01/11

5. Close-up
________
Subtask 27-64-45-942-051
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-45



AIJ




Page 416
Aug 01/11

TASK 27-64-45-000-002

Removal of the Link-Spoiler 5

R
R
R
R
R
R

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
AR WARNING NOTICE(S)



EFF :
ALL
 27-64-45



AIJ




Page 417
Aug 01/11

B. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R

27-60-00-866-002
57-51-37-000-004

3. __________
Job Set-up

Subtask 27-64-45-941-056

A. Safety Precautions

27-64-45-991-004

Extension-Retraction of the Spoilers for Maintenance


Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Put the safety barriers in position.

R
R

(2) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.

R
R

(3) Put a WARNING NOTICE(S) in position to tell persons not to operate


the flight controls.

Subtask 27-64-45-860-053

B. Aircraft Maintenance Configuration

R
R
R

WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.

(1) Extend the spoiler 5 (Ref. TASK 27-60-00-866-002).

R
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on the
flap/slat control lever on panel 114VU.

R
R

(3) Make sure the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-45



AIJ




Page 418
Aug 01/11

Subtask 27-64-45-865-055

C. Open, safety and tag this(these) circuit breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-45-010-053

D. Get Access

R
R
R
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
access panels:
- for the left wing 575GB
- for the right wing 675GB.

R
R
R

(2) Remove the access panels (Ref. TASK 57-51-37-000-004):


- for the left wing, remove 575GB
- for the right wing, remove 675GB.

4. Procedure
_________

Subtask 27-64-45-020-051

A. Removal of the Link-Spoiler 5

R
R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING


_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

R
R

(Ref. Fig. 403/TASK 27-64-45-991-004)

(1) Remove the nut (27) and the locking plate (28).

(2) Remove the spacer (26) and the bolt (25).



EFF :
ALL
 27-64-45



AIJ




Page 419
Aug 01/11

R
R

Link-Spoiler 5
Figure 403/TASK 27-64-45-991-004



EFF :
ALL
 27-64-45



AIJ




Page 420
Aug 01/11

R
R

(3) Remove and discard the cotter pins (5) and (24) from the locking caps
(4) and (23).

(4) Remove the locking caps (4) and (23).

(5) Remove the nuts (3) and (22) and the washers (2) and (21).

(6) Remove the hinge pins (1) and (29) and the sliding bush (20).

R
R

(7) Remove and discard the cotter pins (8) and (17) from the nuts (9) and
(16).

(8) Remove the nuts (9) and (16) and the washers (10) and (15).

(9) Remove the bolts (12) and (13) and the bushes (11) and (14).

(10) Remove the bushes (7) and (18) and the links-spoiler 5 (6) and (19).



EFF :
ALL
 27-64-45



AIJ




Page 421
Aug 01/11

TASK 27-64-45-400-002

Installation of the Link-Spoiler 5

R
R

WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.

R
R

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R
R
R
R

CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific

1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


1 SAFETY BARRIER(S)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)



EFF :
ALL
 27-64-45



AIJ




Page 422
Aug 01/11

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R
R
R
R

Material No. 04-004


Material No. 09-018B
Material No. 09-019B
Material No. 11-026
Material No. 15-009
Material No. 19-003

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
F
AIMS 09-08-003 TYPE III
CORROSION PREVENTIVE TEMPORY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R
R
R

5
5
8
17
24
24

cotter
cotter
cotter
cotter
cotter
cotter

pin
pin
pin
pin
pin
pin

27-64-05
27-64-05
57-75-21
57-75-21
27-64-05
27-64-05



EFF :
ALL
 27-64-45



AIJ




15A-290
15B-290
01M-290
01M-290
15A-090
15B-090

Page 423
Aug 01/11

D. Referenced Information

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R
R

27-60-00-866-002
27-64-00-200-001

3. __________
Job Set-up

Subtask 27-64-45-941-057

A. Safety Precautions

27-64-00-710-001
57-51-37-000-004
57-51-37-400-004
27-64-45-991-004

Extension-Retraction of the Spoilers for Maintenance


Check of the Spoilers Servo Controls and Hinge
Bearings for Excessive Play and Condition
Operational Test of the Spoiler Hydraulic Actuation
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 403

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic system.

R
R

(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight controls.

Subtask 27-64-45-860-054

B. Aircraft Maintenance Configuration

R
R

(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
attached to the flap and slat control lever on panel 114VU.

R
R

(2) Make sure that the spoiler 5 is extended (Ref. TASK 27-60-00-866002).

R
R

(3) Make sure that the COLLAR-SAFETY, SPOILER is on the piston rod of the
servo-control.



EFF :
ALL
 27-64-45



AIJ




Page 424
Aug 01/11

R
R
R
R

(4) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is below the
applicable access panel:
- for the left wing: 575GB
- for the right wing: 675GB.

R
R
R
R

(5) Make sure that the applicable access panel (Ref. TASK 57-51-37-000004) is removed:
- for the left wing: 575GB
- for the right wing: 675GB.

Subtask 27-64-45-865-056

R
R

C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

4. Procedure
_________

Subtask 27-64-45-420-052

A. Preparation for Installation

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R

(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.

(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-64-45



AIJ




Page 425
Aug 01/11

R
R
R
R
R
R

(4) Apply COMMON GREASE (Material No. 04-004) to the:


- hinges on the rear spar,
- hinges on the spoiler,
- sliding bush (20),
- hinge pins (1) and (29).
Subtask 27-64-45-420-053

B. Installation of the Link-Spoiler 5

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

(Ref. Fig. 403/TASK 27-64-45-991-004)

R
R

(1) Put the bushes (7) and (18) and the end of the links-spoiler 5 (6)
and (19) in position on the spoiler brackets.

(2) Install the bushes (11) and (14) and the bolts (12) and (13).

(3) Install the washers (10) and (15) and the nuts (9) and (16).

R
R

(4) TORQUE the nuts (9) and (16) to between 1.13 and 1.36 m.daN (99.99
and 120.35 lbf.in).

R
R

(5) Safety the nuts (9) with the new cotter pin (8) and (16) with the new
cotter pin (17).

R
R

(6) Put the links-spoiler 5 (6) and (19) and the sliding bush (20) in
position. through the rear spar fittings and the spoiler fittings.

(7) Install the hinge pins (1) and (29) through the rear spar fittings.

(8) Install the washers (2) and (21) and the nuts (3) and (22).

R
R

(9) TORQUE the nuts (3) and (22) to between 3.5 and 4.0 m.daN (25.81 and
29.49 lbf.ft).

(10) Install the locking caps (4) and (23) on the nuts (3) and (22).

R
R

(11) Safety the locking cap (4) with the new cotter pin (5) and (23) with
the new cotter pin (24).

R
R
R

(12) Clean the interfaces of the bolt (25) and the spacer (26) with a
clean MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-64-45



AIJ




Page 426
Aug 01/11

R
R
R

(13) Apply a thin layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interfaces of the bolt (25) and the
spacer (26).

(14) Install the bolt (25).

(15) Install the spacer (26), the locking plate (28) and the nut (27).

R
R

(16) TORQUE the nut (27) to between 0.25 and 0.30 m.daN (22.12 and 26.54
lbf.in).

Subtask 27-64-45-220-067

R
R

C. Check of the Spoilers Servo Controls and Hinge Bearings for Excessive
Play and Condition

R
R
R

(1) Do a check of the spoilers servo controls and hinge bearings for
excessive play and condition (Ref. TASK 27-64-00-200-001).
Subtask 27-64-45-916-052

D. Application of Special Materials

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.

R
R
R
R
R
R
R
R

(1) Apply
- the
- the
- the
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-009) to:


cotter pins (5) and (24),
locking caps (4) and (23),
nuts (3) and (22),
washers (2) and (21),
hinge pins (1) and (29),
nut (27),
bolt (25).

5. Close-up
________

Subtask 27-64-45-860-055

A. Aircraft Maintenance Configuration

(1) Retract the spoiler 5 (Ref. TASK 27-60-00-866-002).

R
R

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap
and slat control lever on panel 114VU.



EFF :
ALL
 27-64-45



AIJ




Page 427
Aug 01/11

Subtask 27-64-45-410-052

B. Close Access

R
R

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R
R
R

(2) Install the access panels (Ref. TASK 57-51-37-400-004):


- for the left wing, install 575GB
- for the right wing, install 675GB.

(3) Remove the access platform(s).

Subtask 27-64-45-865-057

R
R

C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18

Subtask 27-64-45-710-051

D. Operational Test

R
R

(1) Do an operational test of the spoiler (Ref. TASK 27-64-00-710-001).


Subtask 27-64-45-942-053

E. Removal of Equipment

(1) Remove the safety barriers.

(2) Remove the warning notice(s).

R
R

(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-45



AIJ




Page 428
Aug 01/11

SPOILER 5 - INSPECTION/CHECK
____________________________
R

TASK 27-64-45-200-001
Inspection/Check of the Spoiler 5
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Because the free movement is more than that in TASK 27-64-00-200-001.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-64-45-000-001
27-64-45-400-001
27-64-45-991-003

Removal of the Spoiler 5


Installation of the Spoiler 5
Fig. 601



EFF :
ALL
 27-64-45



AIJ




Page 601
Feb 01/07

3. __________
Job Set-up
Subtask 27-64-45-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
flight controls.
Subtask 27-64-45-010-051
B. Get Access
(1) Remove the spoiler 5 (Ref. TASK 27-64-45-000-001).
4. Procedure
_________
R

(Ref. Fig. 601/TASK 27-64-45-991-003)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-45-220-051
A. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45



AIJ




Page 602
Feb 01/07

R
R

Spoiler 5
Figure 601/TASK 27-64-45-991-003



EFF :
ALL
 27-64-45



AIJ




Page 603
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| B
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-052
B. Dimemsions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-45


R 
AIJ




Page 604
Feb 01/07

Subtask 27-64-45-220-053
C. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-054
D. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45


R 
AIJ




Page 605
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-055
E. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| C
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 5
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-45


R 
AIJ




Page 606
Feb 01/07

Subtask 27-64-45-220-056
F. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 5
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| C
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 6
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-057
G. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45


R 
AIJ




Page 607
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 2
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 1
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-058
H. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 20.959 | 20.980 |
|
| 20.918 |
|
|
| OD 3
|(0.8251) |(0.8259) |
|
|(0.8235) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 21.000 | 21.021 |
|
|
| 21.062 |
|
| ID 2
|(0.8267) |(0.8275) |
|
|
|(0.8292) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-45


R 
AIJ




Page 608
Feb 01/07

Subtask 27-64-45-220-059
J. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.164 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8725) |
|
|
|
|
|
| 0.008 | 0.041 |
|
| 0.090 |
|
|
|
| (0.0003)| (0.0016)|
|
|(0.0035)|
| D
| 22.213 | 22.225 |
|
|
| 22.254 |
|
| ID 6
|(0.8745) |(0.8750) |
|
|
|(0.8761) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-065
K. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45


R 
AIJ




Page 609
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 28.534 | 28.555 |
|
| 28.493 |
|
|
| OD 4
|(1.1233) |(1.1242) |
|
|(1.1217) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 28.575 | 28.596 |
|
|
| 28.637 |
|
| ID 5
|(1.1250) |(1.1258) |
|
|
|(1.1274) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-066
L. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| D
| 22.184 | 22.205 |
|
| 22.143 |
|
|
| OD 3
|(0.8733) |(0.8742) |
|
|(0.8717) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.144 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0056)|
| D
| 22.225 | 22.246 |
|
|
| 22.287 |
|
| ID 4
|(0.8750) |(0.8758) |
|
|
|(0.8774) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-45


R 
AIJ




Page 610
Feb 01/07

Subtask 27-64-45-220-060
M. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 25.380 | 25.393 |
|
| 25.350 |
|
|
| OD 2
|(0.9992) |(0.9997) |
|
|(0.9980) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 25.400 | 25.433 |
|
|
| 25.463 |
|
| ID 1
|(1.0000) |(1.0012) |
|
|
|(1.0024) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-061
N. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45


R 
AIJ




Page 611
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 2
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-062
P. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 19.030 | 19.043 |
|
| 19.000 |
|
|
| OD 3
|(0.7492) |(0.7497) |
|
|(0.7480) |
|
|
|
|
|
| 0.007 | 0.053 |
|
| 0.113 |
|
|
|
| (0.0002)| (0.0020)|
|
|(0.0044)|
| E
| 19.050 | 19.083 |
|
|
| 19.113 |
|
| ID 4
|(0.7500) |(0.7512) |
|
|
|(0.7524) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-64-45


R 
AIJ




Page 612
Feb 01/07

Subtask 27-64-45-220-063
Q. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| E
| 22.152 | 22.185 |
|
| 22.102 |
|
|
| OD 4
|(0.8721) |(0.8734) |
|
|(0.8701) |
|
|
|
|
|
| 0.027 | 0.073 |
|
| 0.173 |
|
|
|
| (0.0010)| (0.0028)|
|
|(0.0068)|
| E
| 22.212 | 22.225 |
|
|
| 22.275 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8769) |
|
------------------------------------------------------------------------------Subtask 27-64-45-220-064
R. Dimensions of the Spoiler 5
NOTE : Limits on chrome plated items only apply when there is a layer of
____
chrome remaining on the bearing surfaces.
(1) Complete an inspection of these dimensions.



EFF :
ALL
 27-64-45


R 
AIJ




Page 613
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| F
| 7.899 | 7.924 |
|
| 7.880 |
|
|
| OD 1
|(0.3109) |(0.3120) |
|
|(0.3102) |
|
|
|
|
|
| 0.000 | 0.038 |
|
| 0.076 |
|
|
|
| (0.0000)| (0.0015)|
|
|(0.0029)|
| F
| 7.924 | 7.937 |
|
|
| 7.956 |
|
| ID 2
|(0.3120) |(0.3125) |
|
|
|(0.3132) |
|
------------------------------------------------------------------------------5. Close-up
________
Subtask 27-64-45-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the spoiler 5 (Ref. TASK 27-64-45-400-001).
Subtask 27-64-45-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-45


R 
AIJ




Page 614
Feb 01/07

CHECK VALVE (3626GM,3627GM) - REMOVAL/INSTALLATION


__________________________________________________
R

TASK 27-64-48-000-001
Removal of the Check Valve 3626GM(3627GM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
container for hydraulic fluid 2 l (0.5283 USgal)
access platform 3.5 m (11 ft. 6 in.)



EFF :
ALL
 27-64-48



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-60-00-866-002
29-14-00-614-001
29-23-00-860-001
R

27-64-48-991-001
FOR FIN 3626GM
57-51-37-000-004
FOR FIN 3627GM
57-51-37-000-004

Extension of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Depressurization of the Hydraulic Reservoirs
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Fig. 401
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-64-48-991-001)


Subtask 27-64-48-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice on the ground service connection of the Yellow
hydraulic system to tell persons not to pressurize it.
(3) Put a warning notice in the cockpit to tell persons not to operate
the flight controls.
Subtask 27-64-48-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).



EFF :
ALL
 27-64-48



AIJ




Page 402
Feb 01/07

R
R

Check Valves
Figure 401/TASK 27-64-48-991-001



EFF :
ALL
 27-64-48



AIJ




Page 403
Feb 01/07

R
R

(2) Make sure the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) is on the flap/slat control lever.
(3) Lift the spoilers 2 and 3, to get access to the check valve
(Ref. TASK 27-60-00-866-002).
(4) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is
installed.
(5) Disconnect the PTU (Ref. TASK 29-23-00-860-001).
(6) Depressurize the Yellow hydraulic system reservoir (Ref. TASK 29-1400-614-001).
Subtask 27-64-48-010-053
C. Get Access
(1) Put the access platform below the applicable zone:
- FOR 3626GM
below zone 575
- FOR 3627GM
below zone 675.
(2) Put a container for hydraulic fluid below the check valve (3).
(3) If necessary, remove the applicable access panel(s):
- FOR 3626GM
remove 575CB (Ref. TASK 57-51-37-000-004)
- FOR 3627GM
remove 675CB (Ref. TASK 57-51-37-000-004).
Subtask 27-64-48-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/FIRE VALVE/Y/ENG2
3702GD
C14
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL
3701GD
Q36
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21



EFF :
ALL
 27-64-48



AIJ




Page 404
Nov 01/08

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-64-48-991-001)


CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-48-020-050
A. Removal of the Check Valve
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Disconnect the coupling nuts (1) and (2) and remove the check valve
(3). If necessary, remove the clamp block adjacent to the check valve
(3).
(2) Put blanking caps on the disconnected line ends.



EFF :
ALL
 27-64-48



AIJ




Page 405
Feb 01/07

TASK 27-64-48-400-001
Installation of the Check Valve 3626GM(3627GM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


container for hydraulic fluid
safety barriers
warning signs
access platform 3.5 m (11 ft. 6 in.)



EFF :
ALL
 27-64-48



AIJ




Page 406
Feb 01/07

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 02-003A
Material No. 02-003B
R
R

Material No. 11-026


Material No. 19-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
F
NSA 307110
TYPE 4
HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
F
NSA 307-110
TYPE 4
HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-50-00-866-008
27-50-00-866-009
27-60-00-866-002
27-64-00-710-001
29-14-00-614-001
29-14-00-614-002
29-23-00-860-001
29-23-00-860-002
57-51-37-000-004
27-64-48-991-001
FOR FIN 3626GM
57-51-37-400-004

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Connection of the Isolation Coupling of the Power
Transfer Unit (PTU)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Fig. 401
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-64-48



AIJ




Page 407
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 3627GM
57-51-37-400-004

Installation of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-48-991-001)
Subtask 27-64-48-941-056
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure there are warning signs to tell persons not to pressurize
the Yellow hydraulic system.
(3) Make sure there are warning signs to tell persons not to operate the
flight control system.
Subtask 27-64-48-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable zone 575
or 675.
(2) Make sure that the applicable access panels 575CB, 675CB have been
removed (Ref. TASK 57-51-37-000-004).
(3) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(5) Make sure that the spoilers 2 and 3 are lifted (Ref. TASK 27-60-00866-002).
(6) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on the
applicable rod of the servocontrol.



EFF :
ALL
 27-64-48


R 
AIJ




Page 408
Aug 01/11

(7) Make sure that the PTU is disconnected (Ref. TASK 29-23-00-860-001).
(8) Make sure that the Yellow hydraulic-system reservoir is depressurized
(Ref. TASK 29-14-00-614-001).
Subtask 27-64-48-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/FIRE VALVE/Y/ENG2
3702GD
C14
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL
3701GD
Q36
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-64-48


R 
AIJ




Page 409
Aug 01/11

Subtask 27-64-48-420-051
R

A. Preparation for Installation


(Ref. Fig. 401/TASK 27-64-48-991-001)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Do an inspection of the component interface and/or the adjacent area.


(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Remove the blanking caps on the line ends.
(5) Apply HYDRAULIC FLUIDS (Material No. 02-003) or HYDRAULIC FLUIDS
(Material No. 02-003A) or HYDRAULIC FLUIDS (Material No. 02-003B) to
the threads on the check valve (3) and the coupling nuts (1) and (2).
Subtask 27-64-48-420-050
B. Installation of the Check Valve
(1) Install the check valve (3) and tighten the coupling nuts (1) and
(2). If removed, install the clamp block adjacent to the check valve
(3).
(2) Remove the container for hydraulic fluid from below the check valve
(3).



EFF :
ALL
 27-64-48



AIJ




Page 410
Aug 01/11

Subtask 27-64-48-866-053
C. Retract the Spoilers
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the spoilers (Ref. TASK 27-60-00-866-002).
(2) On the servo-control, make sure that the pointer on the hex. head is
opposite the letter O (Operation) on the housing.
Subtask 27-64-48-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
3801GX, 3802GX, 3803GX, 3700GD, 3701GD, 3702GD.
Subtask 27-64-48-860-054
E. Aircraft Maintenance Configuration
(1) Fill the Yellow hydraulic reservoir (Ref. TASK 12-12-29-611-001),
(Ref. TASK 12-12-29-611-002).
(2) Pressurize the Yellow hydraulic system-reservoir (Ref. TASK 29-14-00614-002).
(3) Connect the PTU (Ref. TASK 29-23-00-860-002).
Subtask 27-64-48-865-054
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
21CE1, 21CE2, 21CE3, 22CE.
Subtask 27-64-48-866-052
G. Bleed the Spoilers
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend and retract the spoilers five times (Ref. TASK 27-64-00-710001), to bleed the Yellow hydraulic system.



EFF :
ALL
 27-64-48


R 
AIJ




Page 411
Feb 01/07

Subtask 27-64-48-710-050
H. Test
(1) Do an operational test of the spoilers (Ref. TASK 27-64-00-710-001).
(2) Make sure that there are no leaks from the check valve (3) or the
coupling nuts (1) and (2).
Subtask 27-64-48-865-055
J. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
5. Close-up
________
Subtask 27-64-48-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) If removed, install the applicable access panel:
- FOR 3626GM
install 575CB (Ref. TASK 57-51-37-400-004)
- FOR 3627GM
install 675CB (Ref. TASK 57-51-37-400-004).
Subtask 27-64-48-865-056
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 21CE1, 21CE2, 21CE3, 22CE.



EFF :
ALL
 27-64-48


R 
AIJ




Page 412
Feb 01/07

Subtask 27-64-48-866-051
C. Move the Flaps
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-64-48-942-053
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-48



AIJ




Page 413
Nov 01/08

__________________________________________________________________________
SERVO
CONTROL - SPOILER (31CE1,31CE10,31CE2,31CE3,31CE4,31CE5,31CE6,31CE7,
31CE8,31CE9) - REMOVAL/INSTALLATION
___________________________________
TASK 27-64-51-000-004
Removal of the Spoiler Servo-Control 31CE1 thru 31CE10
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

No specific
No specific
No specific
No specific
No specific
No specific
No specific
98D27603002000
98D27603002001
98D27604000000
98D27604001000
98D27604002000

1
AR
AR
1
1
1
1
1

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
safety barriers
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CONTAINER 1 L (1/4 USGAL)
WARNING NOTICE(S)
KEY-SPOILER MAINTENANCE
KEY-SPOILER MAINTENANCE
COLLAR-SAFETY, SPOILER
STRUT SUPPORT - SPOILER 2, 3, 4, AND 5
STRUT SUPPORT - SPOILER 1



EFF :
ALL
 27-64-51



AIJ




Page 401
Feb 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

98D27803000000

1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
Extension of the Flaps on the Ground
29-00-00-910-002
Safety Procedures of the Hydraulic System
27-64-51-991-006
Fig. 401
27-64-51-991-007
Fig. 402
FOR FIN 31CE1, 31CE2, 31CE9, 31CE10
29-10-00-864-001
Depressurize the Green Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
FOR FIN 31CE3, 31CE4, 31CE7, 31CE8
29-10-00-864-002
Depressurize the Yellow Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
FOR FIN 31CE5, 31CE6
29-10-00-864-003
Depressurize the Blue Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
FOR FIN 31CE1
57-51-37-000-002
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
FOR FIN 31CE2
57-51-37-000-002
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
FOR FIN 31CE3
57-51-37-000-004
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
FOR FIN 31CE4
57-51-37-000-004
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
FOR FIN 31CE5
57-51-37-000-004
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
FOR FIN 31CE6
57-51-37-000-004
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-64-51



AIJ




Page 402
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 31CE7
57-51-37-000-004
FOR FIN 31CE8
57-51-37-000-004
FOR FIN 31CE9
57-51-37-000-004
FOR FIN 31CE10
57-51-37-000-004

Removal of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)

3. __________
Job Set-up
Subtask 27-64-51-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
R

(2) Make sure that WARNING NOTICE(S) are in position to tell persons not
to pressurize the hydraulic systems.

R
R

(3) Make sure that WARNING NOTICE(S) are in position to tell persons not
to pressurize the hydraulic reservoirs.

(4) Make sure that WARNING NOTICE(S) are in position to tell persons not
to operate the flight control surfaces.
Subtask 27-64-51-860-052
B. Aircraft Maintenance Configuration
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is in
position on the slat/flap control lever.



EFF :
ALL
 27-64-51



AIJ




Page 403
Feb 01/11

(3) Depressurize the applicable hydraulic system and the associated


reservoir:
(a) FOR 31CE1, 31CE2, 31CE9, 31CE10
depressurize the Green Hydrualic system (Ref. TASK 29-10-00-864001) and the Green Hydraulic reservoir (Ref. TASK 29-14-00-614001)
(b) FOR 31CE3, 31CE4, 31CE7, 31CE8
depressurize the Yellow Hydraulic system (Ref. TASK 29-10-00-864002) and the Yellow Hydraulic reservoir (Ref. TASK 29-14-00-614001)
(c) FOR 31CE5, 31CE6
depressurize the Blue Hydraulic system (Ref. TASK 29-10-00-864003) and the Blue Hydraulic reservoir (Ref. TASK 29-14-00-614001).
Subtask 27-64-51-865-060
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03



EFF :
ALL
 27-64-51


R 
AIJ




Page 404
Nov 01/10

Subtask 27-64-51-010-052
D. Get Access
R
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
correct zone:

R
R

(a) FOR 31CE1


below zone 582

R
R

(b) FOR 31CE2


below zone 682

R
R

(c) FOR 31CE3


below zone 583

R
R

(d) FOR 31CE4


below zone 683

R
R

(e) FOR 31CE5


below zone 584

R
R

(f) FOR 31CE6


below zone 684

R
R

(g) FOR 31CE7


below zone 585

R
R

(h) FOR 31CE8


below zone 685

R
R

(i) FOR 31CE9


below zone 586

R
R

(j) FOR 31CE10


below zone 686.
(2) Remove the applicable access panel:
(a) FOR 31CE1
remove 573BB (Ref. TASK 57-51-37-000-002)
(b) FOR 31CE2
remove 673BB (Ref. TASK 57-51-37-000-002)
(c) FOR 31CE3
remove 575BB (Ref. TASK 57-51-37-000-004)



EFF :
ALL
 27-64-51



AIJ




Page 405
Feb 01/11

(d) FOR 31CE4


remove 675BB (Ref. TASK 57-51-37-000-004)
(e) FOR 31CE5
remove 575DB (Ref. TASK 57-51-37-000-004)
(f) FOR 31CE6
remove 675DB (Ref. TASK 57-51-37-000-004)
(g) FOR 31CE7
remove 575EB (Ref. TASK 57-51-37-000-004)
(h) FOR 31CE8
remove 675EB (Ref. TASK 57-51-37-000-004)
(i) FOR 31CE9
remove 575GB (Ref. TASK 57-51-37-000-004)
(j) FOR 31CE10
remove 675GB (Ref. TASK 57-51-37-000-004).
(3) Lift the applicable spoiler for access.
R
R
R
R

(a) On the applicable spoiler servo-control, put the KEY-SPOILER


MAINTENANCE or KEY-SPOILER MAINTENANCE into the maintenance
device of the servo-control and turn it to the maintenance
position, then manually lift the spoiler.

(b) Install the COLLAR-SAFETY, SPOILER on the piston rod of the


applicable servo-control.

(4) Put a CONTAINER 1 L (1/4 USGAL) below the hydraulic unions of the
applicable spoiler servo-control.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-51-991-006, 402/TASK 27-64-51-991-007)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-64-51



AIJ




Page 406
Feb 01/11

Subtask 27-64-51-020-053
A. Removal of the Spoiler Servo-Control 31CE1 thru 31CE10
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.
(1) Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2) Disconnect the hydraulic unions of the applicable servo-control:
(a) FOR 31CE1, 31CE2
disconnect the unions (1), (2) and (4)
(b) FOR 31CE3
disconnect the unions (23), (24), (25) and (27)
(c) FOR 31CE4
disconnect the unions (5), (7), (8) and (10)
(d) FOR 31CE5
disconnect the unions (17), (18), (20), (21) and (22)
(e) FOR 31CE6
disconnect the unions (11), (12), (13) and (16)
(f) FOR 31CE7
disconnect the unions (30) and (31)
(g) FOR 31CE8
disconnect the unions (32) and (33)
(h) FOR 31CE9
disconnect the unions (34), (36), (37), (38) and (40)
(i) FOR 31CE10
disconnect the unions (41), (42), (43), (45), (46) and (47).
(3) Remove all the drops of hydraulic fluid from the adjacent aircraft
structure.



EFF :
ALL
 27-64-51


R 
AIJ




Page 407
Nov 01/10

Spoilers 1 thru 5 Servo-Control - Hydraulic Line Details


Figure 401/TASK 27-64-51-991-006- 12 (SHEET 1)



EFF :
ALL
 27-64-51



AIJ




Page 408
Feb 01/11

Spoilers 1 thru 5 Servo-Control - Hydraulic Line Details


Figure 401/TASK 27-64-51-991-006- 22 (SHEET 2)



EFF :
ALL
 27-64-51



AIJ




Page 409
Feb 01/11

R
R

Spoilers 1 thru 5 Servo-Control - Location and Detail


Figure 402/TASK 27-64-51-991-007



EFF :
ALL
 27-64-51



AIJ




Page 410
Feb 01/07

(4) Remove the applicable hydraulic pipes:


(a) FOR 31CE1, 31CE2
remove the pipe (3)
(b) FOR 31CE3
remove the pipes (22) and (26)
(c) FOR 31CE4
remove the pipes (6) and (9)
(d) FOR 31CE5
remove the pipe (19)
(e) FOR 31CE6
remove the pipe (14)
(f) FOR 31CE9
remove the pipe (35) and the connector (39)
(g) FOR 31CE10
remove the pipe (44) and (49) and the connector (48).
(5) Put blanking plugs on the disconnected line ends.
(6) Disconnect the electrical connector (73).
(7) Put blanking caps on the disconnected electrical connector(s).
(8) Install the correct spoiler support strut:
- for spoiler 1, install STRUT SUPPORT - SPOILER 1
- for spoilers 2 thru 5, install STRUT SUPPORT - SPOILER 2, 3, 4, AND
5.

R
R
R

(9) Remove and discard the cotter pin (70) from the locking cap (69).
(10) Remove the locking cap (69), the nut (68) and the washer (67).
(11) Remove the special bolt (65) and the sliding bush (66) from the
spoiler attachment bracket.
(12) Remove the bolts (61) and the washers (60).
(13) Remove all the drops of hydraulic fluid from the adjacent aircraft
structure.



EFF :
ALL
 27-64-51



AIJ




Page 411
Feb 01/11

(14) Move the servo control approximately 6 mm (0.2362 in.) away from the
structure to disengage the location dowels.
(15) Move the servo-control away from the applicable hydraulic line
connector:
(a) FOR 31CE1, 31CE2
the connector (1)
(b) FOR 31CE5
the connector (21)
(c) FOR 31CE6
the connector (12)
(d) FOR 31CE7
the connectors (30) and (31)
(e) FOR 31CE8
the connectors (32) and (33).
(16) Remove the spoiler servo-control.
(17) Remove the flanged bush (64).
(18) Remove the COLLAR-SAFETY, SPOILER from the piston rod of the spoiler
servo-control.



EFF :
ALL
 27-64-51


R 
AIJ




Page 412
Nov 01/10

TASK 27-64-51-400-004
Installation of the Spoiler Servo-Control 31CE1 thru 31CE10
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

R
R

No specific
98D27603002000
98D27603002001

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 KEY-SPOILER MAINTENANCE
1 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-51



AIJ




Page 413
Feb 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

98D27604000000
98D27604001000
98D27604002000
98D27803000000

1
2
2
1

COLLAR-SAFETY, SPOILER
STRUT SUPPORT - SPOILER 2, 3, 4, AND 5
STRUT SUPPORT - SPOILER 1
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
R
R
R
R

Material No. 09-018B


Material No. 09-019B
Material No. 11-026
Material No. 15-007
Material No. 15-008
Material No. 19-003
Material No. 19-010

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
USA AMS 3267
LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 2
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------70

cotter pin

27-64-05 02B-020



EFF :
ALL
 27-64-51



AIJ




Page 414
Feb 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-21-12-911-001

Tightening Torques for Pipe Unions (not for OXYGEN


unions)
20-23-11-917-001
Tightening Practices for Hydraulic Connections
27-50-00-866-008
Extension of the Flaps on the Ground
27-50-00-866-009
Retraction of the Flaps on the Ground
27-64-00-710-001
Operational Test of the Spoiler Hydraulic Actuation
27-64-00-820-001
Adjustment of the Spoilers
57-51-37-000-002
Removal of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB), 573EB(673EB)
57-51-37-000-004
Removal of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
27-64-51-991-006
Fig. 401
27-64-51-991-007
Fig. 402
FOR FIN 31CE1, 31CE2, 31CE9, 31CE10
29-10-00-863-001
Pressurize the Green Hydraulic System
29-10-00-864-001
Depressurize the Green Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
29-14-00-614-002
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
FOR FIN 31CE3, 31CE4, 31CE7, 31CE8
29-10-00-863-002
Pressurize the Yellow Hydraulic System
29-10-00-864-002
Depressurize the Yellow Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
29-14-00-614-002
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
FOR FIN 31CE5, 31CE6
29-10-00-863-003
Pressurize the Blue Hydraulic System with a Ground
Power Supply
29-10-00-864-003
Depressurize the Blue Hydraulic System
29-14-00-614-001
Depressurization of the Hydraulic Reservoirs
29-14-00-614-002
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
FOR FIN 31CE1
57-51-37-400-002
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
FOR FIN 31CE2
57-51-37-400-002
Installation of the Access Panels 573AB(673AB),
573BB(673BB), 573CB(673CB) 573EB(673EB)
FOR FIN 31CE3



EFF :
ALL
 27-64-51


R 
AIJ




Page 415
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------57-51-37-400-004
FOR FIN 31CE4
57-51-37-400-004
FOR FIN 31CE5
57-51-37-400-004
FOR FIN 31CE6
57-51-37-400-004
FOR FIN 31CE7
57-51-37-400-004
FOR FIN 31CE8
57-51-37-400-004
FOR FIN 31CE9
57-51-37-400-004
FOR FIN 31CE10
57-51-37-400-004

Installation of the Access Panels


575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
Installation of the Access Panels
575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB
(675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)



EFF :
ALL
 27-64-51


R 
AIJ




Page 416
Nov 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-64-51-991-006, 402/TASK 27-64-51-991-007)
Subtask 27-64-51-941-058
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S)S are in position.
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic systems.
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the hydraulic reservoirs.
R

(4) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the flight control surfaces.
Subtask 27-64-51-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the slat/flap control lever.
(3) Make sure that the applicable hydraulic system and hydraulic
reservoir are depressurized:
(a) FOR 31CE1, 31CE2, 31CE9, 31CE10
the Green Hydraulic system (Ref. TASK 29-10-00-864-001) and the
Green Hydraulic reservoir (Ref. TASK 29-14-00-614-001)
(b) FOR 31CE3, 31CE4, 31CE7, 31CE8
the Yellow Hydraulic system (Ref. TASK 29-10-00-864-002) and the
Yellow Hydraulic reservoir (Ref. TASK 29-14-00-614-001)
(c) FOR 31CE5, 31CE6
the Blue Hydraulic system (Ref. TASK 29-10-00-864-003) and the
Blue Hydraulic reservoir (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-64-51



AIJ




Page 417
Feb 01/11

R
R

(4) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the correct zone:
(a) FOR 31CE1
below zone 582
(b) FOR 31CE2
below zone 682
(c) FOR 31CE3
below zone 583
(d) FOR 31CE4
below zone 683
(e) FOR 31CE5
below zone 584
(f) FOR 31CE6
below zone 684
(g) FOR 31CE7
below zone 585
(h) FOR 31CE8
below zone 685
(i) FOR 31CE9
below zone 586
(j) FOR 31CE10
below zone 686.
(5) Make sure that the correct access panel is removed (Ref. TASK 57-5137-000-002) (Ref. TASK 57-51-37-000-004):
(a) FOR 31CE1
573BB
(b) FOR 31CE2
673BB
(c) FOR 31CE3
575BB
(d) FOR 31CE4
675BB



EFF :
ALL
 27-64-51



AIJ




Page 418
Feb 01/11

(e) FOR 31CE5


575DB
(f) FOR 31CE6
675DB
(g) FOR 31CE7
575EB
(h) FOR 31CE8
675EB
(i) FOR 31CE9
575GB
(j) FOR 31CE10
675GB.
(6) Make sure that the applicable spoiler is extended and supported with
the STRUT SUPPORT - SPOILER 1 or the STRUT SUPPORT - SPOILER 2, 3, 4,
AND 5.

R
R

(7) Make sure that the container is below the hydraulic unions of the
applicable spoiler servo-control.
R

(8) Put the KEY-SPOILER MAINTENANCE or the KEY-SPOILER MAINTENANCE into


the maintenance device of the applicable spoiler servo-control and
turn it to the maintenance position.
Subtask 27-64-51-865-061
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SEC1/NORM/SPLY
21CE1
B08
49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
105VU FLT CTL/SEC1/STBY SPLY
22CE
B01
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SEC3/SPLY
21CE3
Q19
121VU FLIGHT CONTROLS/SEC2/SPLY
21CE2
Q18



EFF :
ALL
 27-64-51



AIJ




Page 419
Feb 01/11

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
4. Procedure
_________
(Ref. Fig. 401/TASK 27-64-51-991-006, 402/TASK 27-64-51-991-007)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-51-560-050
A. Preparation for a Replacement Component
(1) Push the piston rod into the body of the servo-control until it
touches the internal limit.
(2) Measure the dimension X. Dimension X must be between 220.0 mm (8.6614
in.) and 223.0 mm (8.7795 in.).
(3) To adjust the piston rod to get the dimension X:
(a) Remove and discard the lockwire from the locknut (72).
(b) Loosen the locknut (72).
(c) Turn the eye-end (63) in the applicable direction.
(d) Make sure that the serrated washers (62) and (71) are engaged
correctly.
(4) When the dimension X is correct, TORQUE the locknut (72) to between
3.0 and 8.0 m.daN (22.12 and 58.99 lbf.ft).
(5) Safety the locknut (72) with MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-64-51


R 
AIJ




Page 420
Feb 01/11

Subtask 27-64-51-420-060
B. Preparation for Installation
R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Make sure that the hydraulic line end-fittings are serviceable.
(5) Extend, by hand, the piston rod of the spoiler servo-control.

(6) Install the COLLAR-SAFETY, SPOILER on the piston rod of the spoiler
servo-control.
Subtask 27-64-51-420-053
C. Installation of the Spoiler Servo-Control

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
CAUTION : SUPPORT THE SERVO CONTROL 7.5kg (16.5lb) AND THE SPOILER
_______
APPROXIMATELY 15kg (33lb). THIS WILL PREVENT DAMAGE TO:
- THE HYDRAULIC LINES
- THE ELECTRICAL CABLES
- THE STRUCTURE.

R
R

(1) Apply a layer of SEALANTS (Material No. 09-018B) or SEALANTS


(Material No. 09-019B) to the interface of the servo-control and
under the heads of the bolts (61).
(2) Install the spoiler servo-control, make sure that the location dowels
engage correctly.
(3) Remove the blanking caps from the spoiler servo-control and the
hydraulic and electrical connections.



EFF :
ALL
 27-64-51



AIJ




Page 421
Feb 01/11

(4) Connect the applicable hydraulic unions to the spoiler servo-control


(Ref. TASK 20-23-11-917-001) (Ref. TASK 20-21-12-911-001):
(a) FOR 31CE1, 31CE2
the pipe (3) and the unions (1), (2) and (4)
(b) FOR 31CE3
the pipes (22) and (26) and the unions (23), (24), (25) and (27)
(c) FOR 31CE4
the pipes (6) and (9) and the unions (5), (7), (8) and (10)
(d) FOR 31CE5
the pipe (19) and the unions (17), (18), (20), (21) and (22)
(e) FOR 31CE6
the pipe (14) and the unions (11), (12), (13), (15) and (16)
(f) FOR 31CE7
the unions (30) and (31)
(g) FOR 31CE8
the unions (32) and (33)
(h) FOR 31CE9
the pipe (35), the connector (39) and the unions (34), (36),
(37), (38) and (40)
(i) FOR 31CE10
the pipes (44) and (49), the connector (48) and the unions (41),
(42), (43), (45), (46) and (47).
(5) Install the washers (60) and the bolts (61).
(6) TORQUE the bolts (61) to between 2.95 and 3.26 m.daN (21.75 and 24.04
lbf.ft).
(7) If applicable, turn the eye-end (63) and the piston rod together so
that the greaser points down.
(8) Apply
- the
- the
- the
- the

a thin layer of COMMON GREASE (Material No. 04-004) to:


flanged bush (64)
special bolt (65)
sliding bush (66)
spoiler attachment bracket.



EFF :
ALL
 27-64-51


R 
AIJ




Page 422
Feb 01/11

(9) Install the flanged bush (64) and the sliding bush (66) in the
spoiler attachment bracket.
(10) Put the eye-end (63) in position in the spoiler attachment bracket
and install the special bolt (65).
(11) Make sure that the special bolt (65) engages correctly with the
projection on the spoiler attachment bracket.
(12) Measure the dimension Z. The dimension Z must not be more than 0.70
mm (0.0275 in.).
(13) Install the washer (67) and the nut (68) on the special bolt (65),
but do not tighten.
R
R

(14) Remove the applicable spoiler support strut STRUT SUPPORT - SPOILER 1
or STRUT SUPPORT - SPOILER 2, 3, 4, AND 5.
(15) Install the electrical connector (73).
(16) Clean the electrical connector (73) with a MISCELLANEOUS (Material
No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(17) Apply a continuous layer of STORAGE PRESERVATION (Material No. 15008) to the electrical connector (73).
(18) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-64-51-865-062
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL
3701GD
Q36
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34



EFF :
ALL
 27-64-51



AIJ




Page 423
Feb 01/11

R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
Subtask 27-64-51-860-054
E. Aircraft Maintenance Configuration

R
R
R

WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THIS/THESE


_______
MATERIAL/S.
USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
(2) Remove the COLLAR-SAFETY, SPOILER from the applicable spoiler
servo-control and lower, by hand, the applicable spoiler.
(3) Measure the distance between the applicable spoiler and the flap
(Ref. TASK 27-64-00-820-001).
(4) When the clearance is correct:
(a) TORQUE the nut (68) to between 5.2 and 6.5 m.daN (38.34 and 47.93
lbf.ft).
(b) Install the locking cap (69) on the nut (68).
(c) Safety the locking cap (69) with the new cotter pin (70).

R
R

(5) On the spoiler servo-control, turn the KEY-SPOILER MAINTENANCE or the


KEY-SPOILER MAINTENANCE in the maintenance device to the operation
position and then remove it.
(6) Apply
- the
- the
pin
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


washers (60), the bolts (61) and the special bolt (65)
washer (67), the nut (68), the locking cap (69) and the cotter
(70)
bolt of the maintenance device.



EFF :
ALL
 27-64-51



AIJ




Page 424
Feb 01/11

(7) Pressurize the applicable hydraulic system and reservoir:


(a) FOR 31CE1, 31CE2, 31CE9, 31CE10
pressurize the Green Hydraulic system (Ref. TASK 29-10-00-863001) and the Green Hydraulic system reservoir (Ref. TASK 29-1400-614-002)
(b) FOR 31CE3, 31CE4, 31CE7, 31CE8
pressurize the Yellow Hydraulic system (Ref. TASK 29-10-00-863002) and the Yellow Hydraulic system reservoir (Ref. TASK 29-1400-614-002)
(c) FOR 31CE5, 31CE6
pressurize the Blue Hydraulic system (Ref. TASK 29-10-00-863-003)
and Blue Hydraulic system reservoir (Ref. TASK 29-14-00-614-002).
(8) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-64-51-710-053
F. Test
(1) Do a minimum of ten full travel operations of the spoilers, to bleed
all the air from the servo-controls (Ref. TASK 27-64-00-710-001).
(2) Do an operational test of the spoilers (Ref. TASK 27-64-00-710-001).
(3) Examine the spoiler servo-control for hydraulic leaks. No leaks are
permitted.
5. Close-up
________
Subtask 27-64-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) FOR 31CE1
install 573BB (Ref. TASK 57-51-37-400-002)
(b) FOR 31CE2
install 673BB (Ref. TASK 57-51-37-400-002)



EFF :
ALL
 27-64-51


R 
AIJ




Page 425
Feb 01/11

(c) FOR 31CE3


install 575BB (Ref. TASK 57-51-37-400-004)
(d) FOR 31CE4
install 675BB (Ref. TASK 57-51-37-400-004)
(e) FOR 31CE5
install 575DB (Ref. TASK 57-51-37-400-004)
(f) FOR 31CE6
install 675DB (Ref. TASK 57-51-37-400-004)
(g) FOR 31CE7
install 575EB (Ref. TASK 57-51-37-400-004)
(h) FOR 31CE8
install 675EB (Ref. TASK 57-51-37-400-004)
(i) FOR 31CE9
install 575GB (Ref. TASK 57-51-37-400-004)
(j) FOR 31CE10
install 675GB (Ref. TASK 57-51-37-400-004).
Subtask 27-64-51-942-054
B. Removal of Equipment
R

(1) Remove the SAFETY BARRIER(S).


(2) Remove the access platform(s).
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-51



AIJ




Page 426
Feb 01/11

TASK 27-64-51-000-002
Removal of the Servo-Valve from the Spoiler Servo-Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27603002000
98D27603002001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
1 KEY-SPOILER MAINTENANCE
1 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-51


R 
AIJ




Page 427
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001
27-64-51-991-004

Extension of the
Depressurize the
Depressurize the
Depressurize the
Depressurization
Fig. 403

Flaps on the Ground


Green Hydraulic System
Yellow Hydraulic System
Blue Hydraulic System
of the Hydraulic Reservoirs

3. __________
Job set up
(Ref. Fig. 403/TASK 27-64-51-991-004)
Subtask 27-64-51-941-061
A. Safety Precautions
(1) Put the safety barriers are in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the flight controls.
(3) Put a warning notice in the cockpit to tell persons not to pressurize
the hydraulics.
Subtask 27-64-51-860-059
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is installed.



EFF :
ALL
 27-64-51


R 
AIJ




Page 428
Nov 01/10

Servo-Valve - Location and Detail


Figure 403/TASK 27-64-51-991-004


EFF :
ALL
 27-64-51


R 
AIJ




Page 429
Nov 01/10

(3) Lift the applicable spoiler for access


(a) Put the KEY-SPOILER MAINTENANCE (98D27603002000) or the KEYSPOILER MAINTENANCE (98D27603002001) into the maintenance device
of the applicable servo-control and turn it to the maintenance
position.
(b) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on
the piston rod of the servo-control.
(4) Depressurize the applicable hydraulic system:
- for the spoiler 1 and the spoiler 5, depressurize the Green
hydraulic system (Ref. TASK 29-10-00-864-001) and the green
hydraulic reservoir (Ref. TASK 29-14-00-614-001)
- for the spoiler 2 and the spoiler 4, depressurize the Yellow
hydraulic system (Ref. TASK 29-10-00-864-002) and the yellow
hydraulic reservoir (Ref. TASK 29-14-00-614-001)
- for the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003) and the blue hydraulic system
reservoir (Ref. TASK 29-14-00-614-001).
Subtask 27-64-51-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
Subtask 27-64-51-010-054
D. Get Access
(1) Put the access platform in position below the applicable servo-valve
(3).



EFF :
ALL
 27-64-51


R 
AIJ




Page 430
Nov 01/10

4. Procedure
_________
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-51-020-051
A. Removal of the Servo-Valve from the Spoiler Servo-Control
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
_______
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut, remove and discard the lockwire from the bolts (4).
(2) Remove the bolts (4) from the servo-valve (3).
(3) Remove the servo-valve (3) from the spoiler servo-control (1).
(4) Remove and retain the gasket (5).
(5) Remove and discard the O-ring (2).
(6) Put a blanking cover on the open spoiler servo-control (1) interface
to prevent entry of unwanted material.



EFF :
ALL
 27-64-51


R 
AIJ




Page 431
Nov 01/10

TASK 27-64-51-400-002
Installation of the Servo-Valve on the Spoiler Servo-Control
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No
No

specific
specific
specific
specific
specific
specific

98D27603002000
98D27603002001

safety barriers
soft brush
warning notice
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 KEY-SPOILER MAINTENANCE
1 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-51


R 
AIJ




Page 432
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 04-010
Material No. 04-015
Material No. 11-026
Material No. 19-003
Material No. 19-010

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-G-25013
GREASE SYNTHETIC, BALL+ROLLER BEARING (Ref. 20-31-00)
USA BAC 5001
DACO-5073
GREASE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2
5

O-ring
gasket

27-64-51 01 -050
27-64-51 01 -060

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
27-50-00-866-008
27-60-00-866-002
27-64-00-710-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-14-00-614-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs



EFF :
ALL
 27-64-51


R 
AIJ




Page 433
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-14-00-614-002
27-64-51-991-004

Pressurization of the Hydraulic Reservoirs through


the Ground Connector
Fig. 403

3. __________
Job set-up
Subtask 27-64-51-941-059
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) are in the cockpit to tell
persons not to operate the slat controls.
(3) Make sure that the warning notice is in the cockpit to tell persons
not to pressurize the hydralic systems.
Subtask 27-64-51-860-055
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the access platform is below the applicable
servo-valve (3).
(2) Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866008).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed.
(4) Make sure that the applicable spoiler (Ref. TASK 27-60-00-866-002)
has been extended.
(5) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on the
piston rod of the servo-control.



EFF :
ALL
 27-64-51


R 
AIJ




Page 434
Nov 01/10

(6) Make sure that the applicable hydraulic system is depressurized:


- for the spoiler 1 and the spoiler 5, depressurize the Green
hydraulic system (Ref. TASK 29-10-00-864-001) and the green
hydraulic reservoir (Ref. TASK 29-14-00-614-001)
- for the spoiler 2 and the spoiler 4, depressurize the Yellow
hydraulic system (Ref. TASK 29-10-00-864-002) and the yellow
hydraulic reservoir (Ref. TASK 29-14-00-614-001)
- for the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003) and the blue hydraulic system
reservoir (Ref. TASK 29-14-00-614-001).
Subtask 27-64-51-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
4. Procedure
_________
(Ref. Fig. 403/TASK 27-64-51-991-004)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-64-51


R 
AIJ




Page 435
Nov 01/10

Subtask 27-64-51-420-057
A. Preparation for Installation
(1) Remove the blanking cover from the servo-valve.
(2) Use a clean MISCELLANEOUS (Material No. 19-003) and a soft brush with
CLEANING AGENTS (Material No. 11-026) to clean the servo-valve (3)
and the servo-control (1) interfaces.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Examine the gasket (5) for the correct condition and replace the item
if it is damaged.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(6) Lubricate the new O-ring (2) with HYDRAULIC FLUIDS (Material No. 02003).
(7) Apply a layer of COMMON GREASE (Material No. 04-015) to the gasket
(5).
(8) Apply a layer of COMMON GREASE (Material No. 04-010) to the threads
of the bolts (4).
Subtask 27-64-51-420-058
B. Installation of the Servo-Valve on the Spoiler Servo-Control
(1) Install the gasket (5) on the servo-valve (3).
(2) Install the new O-ring (2) on the servo-valve (3).
(3) Put the servo-valve (3) into position on the spoiler servo-control
(1).
(4) Install the bolts (4) through the servo-valve (3) and into the
spoiler servo-control valve (1).
(5) TORQUE the bolts (4) to 0.69 m.daN (61.06 lbf.in).
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK.
_______
LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
(6) Safety the bolts (4) with MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-64-51


R 
AIJ




Page 436
Nov 01/10

(7) Lower the applicable spoiler (Ref. TASK 27-60-00-866-002).


(8) On the servo-control, turn the KEY-SPOILER MAINTENANCE
(98D27603002000) or the KEY-SPOILER MAINTENANCE (98D27603002001) in
the maintenance device to the operation position and then remove it.
Subtask 27-64-51-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 1701GK, 1702GK, 1801GL, 2701GJ, 2702GJ, 3700GD, 3801GX, 3802GX,
3803GX.
Subtask 27-64-51-863-050
D. Fill and Pressurize the Hydraulic Systems
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
(1) Fill the applicable hydraulic system reservoir (Ref. TASK 12-12-29611-001).
(2) Pressurize the applicable hydraulic system:
- for the spoiler 1 and the spoiler 5, pressurize the Green hydraulic
system (Ref. TASK 29-10-00-863-001) and the green hydraulic system
reservoir (Ref. TASK 29-14-00-614-002)
- for the spoiler 2 and the spoiler 4, pressurize the Yellow
hydraulic system (Ref. TASK 29-10-00-863-002) and the yellow
hydraulic system reservoir (Ref. TASK 29-14-00-614-002)
- for the spoiler 3, pressurize the Blue hydraulic system (Ref. TASK
29-10-00-863-003) and the blue hydraulic system reservoir
(Ref. TASK 29-14-00-614-002).
Subtask 27-64-51-870-052
E. Bleed the Servo-Controls
(1) Do a minimum of ten full travel operations of the spoilers, to bleed
all the air from the servo-controls (Ref. TASK 27-64-00-710-001).



EFF :
ALL
 27-64-51


R 
AIJ




Page 437
Nov 01/10

Subtask 27-64-51-710-051
F. Test
(1) Do an operational test of the spoilers (Ref. TASK 27-64-00-710-001).
(2) Examine the servo-valve (3) and its interface with the spoiler
servo-control (1) for leaks.
5. ________
Close up
Subtask 27-64-51-942-052
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-51


R 
AIJ




Page 438
Nov 01/10

TASK 27-64-51-000-003
Removal of the Filter
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
98D27604000000
98D27803000000

blanking plug
circuit breaker(s) safety clip(s)
safety barriers
warning notice
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
1 COLLAR-SAFETY, SPOILER
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-64-51


R 
AIJ




Page 439
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-866-008
27-60-00-866-002
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
27-64-51-991-005

Extension of the Flaps on the Ground


Extension-Retraction of the Spoilers for Maintenance
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Fig. 404

3. __________
Job set up
Subtask 27-64-51-941-062
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in the cockpit to tell persons not to
operate the slat controls.
(3) Put the warning notice in the cockpit to tell persons not to
pressurize the hydraulics.
Subtask 27-64-51-865-056
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03



EFF :
ALL
 27-64-51


R 
AIJ




Page 440
Nov 01/10

Subtask 27-64-51-860-060
C. Aircraft Maintenance Configuration
(1) Extend the applicable spoiler (Ref. TASK 27-60-00-866-002).
(2) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on the
piston rod of the servo-control.
(3) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed.
(5) Depressurize the applicable hydraulic system:
- For the spoiler 1 and the spoiler 5, depressurize the Green
hydraulic system (Ref. TASK 29-10-00-864-001),
- for the spoiler 2 and the spoiler 4, depressurize the Yellow
hydraulic system (Ref. TASK 29-10-00-864-002).
- for the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
Subtask 27-64-51-010-055
D. Get Access
(1) Put the access platform in position below the applicable spoiler
servo control.
4. Procedure
_________
(Ref. Fig. 404/TASK 27-64-51-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.



EFF :
ALL
 27-64-51


R 
AIJ




Page 441
Nov 01/10

Filter Assembly - Location and Detail


Figure 404/TASK 27-64-51-991-005


EFF :
ALL
 27-64-51


R 
AIJ




Page 442
Nov 01/10

Subtask 27-64-51-020-052
A. Removal of the Filter
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
_______
LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut, remove and discard the lockwire from the filter (2).
(2) Remove the filter (2) from the spoiler servo control.
(3) Remove and discard the O-ring (1) from the filter (2).
(4) Install a blanking plug on the spoiler servo control.



EFF :
ALL
 27-64-51


R 
AIJ




Page 443
Nov 01/10

TASK 27-64-51-400-003
Installation of the Filter
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No
No

specific
specific
specific
specific
specific

98D27603002000
98D27603002001

safety barriers
warning notice
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 KEY-SPOILER MAINTENANCE
1 KEY-SPOILER MAINTENANCE



EFF :
ALL
 27-64-51



AIJ




Page 444
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 11-026
Material No. 19-003
Material No. 19-010

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1

O-ring

27-64-51 01 -020

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-50-00-866-008
27-60-00-866-002
27-64-00-710-001
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
27-64-51-991-005

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Extension of the Flaps on the Ground
Extension-Retraction of the Spoilers for Maintenance
Operational Test of the Spoiler Hydraulic Actuation
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Fig. 404



EFF :
ALL
 27-64-51


R 
AIJ




Page 445
Nov 01/10

3. __________
Job Set-up
Subtask 27-64-51-941-064
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) is/are in the cockpit to tell
persons not to operate the slat controls.
(3) Make sure that the warning notice is in the cockpit to tell persons
not to pressurize the hydraulics.
Subtask 27-64-51-860-056
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable spoiler
servo control.
(2) Make sure that the applicable spoiler has been extended (Ref. TASK
27-60-00-866-002).
(3) Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on the
piston rod of the servo-control.
(4) Make sure that the flaps have been extended (Ref. TASK 27-50-00-866008).
(5) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed.
(6) Make sure that the applicable hydraulic system is depressurized:
- For the spoiler 1 and the spoiler 5, depressurize the Green
hydraulic system (Ref. TASK 29-10-00-864-001)
- for the spoiler 2 and the spoiler 4, depressurize the Yellow
hydraulic system (Ref. TASK 29-10-00-864-002)
- for the spoiler 3, depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).



EFF :
ALL
 27-64-51


R 
AIJ




Page 446
Nov 01/10

Subtask 27-64-51-865-057
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU HYD/HYD PWR/B WARN/& CTL
2702GJ
C12
121VU HYDRAULIC/SOL VALVES/G/Y/PTU
1801GL
N34
121VU HYDRAULIC/HYD POWER/Y
3803GX
N30
121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG
3700GD
Q37
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU HYDRAULIC/G HYD/PUMP ENG1/CTL
1701GK
R35
121VU HYDRAULIC/G HYD/PUMP ENG1/MONG
1702GK
R34
123VU B HYD/ELEC PUMP
2701GJ
AB09
123VU Y HYD/ELEC/PUMP
3802GX
AB06
123VU Y HYD/ELEC/ELEC PUMP/NORM
3801GX
AB03
4. Procedure
_________
(Ref. Fig. 404/TASK 27-64-51-991-005)
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
_______
EDGE:
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
- DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
- MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
INCORRECT INSTALLATION CAN CAUSE DAMAGE.
Subtask 27-64-51-420-059
A. Preparation for Installation
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the filter (2) is in the correct condition.
(4) Lubricate a new O-ring (1) with HYDRAULIC FLUIDS (Material No. 02003).



EFF :
ALL
 27-64-51


R 
AIJ




Page 447
Nov 01/10

Subtask 27-64-51-420-052
B. Installation of the Filter
(1) Install the new O-ring (1) on the filter (2).
(2) Remove the blanking plug from the spoiler servo-control.
(3) Lubricate the threads of the filter with HYDRAULIC FLUIDS (Material
No. 02-003).
(4) Install the filter (2) in the spoiler servo-control.
(5) TORQUE the filter (2) to 4 m.daN (29.49 lbf.ft).
Subtask 27-64-51-080-050
C. Removal of Support Equipment
(1) Remove the COLLAR-SAFETY, SPOILER (98D27604000000).
Subtask 27-64-51-865-058
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 1701GK, 1702GK, 1801GL, 2701GJ, 2702GJ, 3700GD, 3801GX, 3802GX,
3803GX.
Subtask 27-64-51-860-062
E. Aircraft Maintenance Configuration
(1) Fill the applicable hydraulic system reservoir, if necessary,
(Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
(2) Do a minimum of ten full travel operations of the spoilers, to bleed
all the air from the servo-controls (Ref. TASK 27-64-00-710-001).
Subtask 27-64-51-866-059
F. Extend the Spoiler
(1) Extend the applicable spoiler (Ref. TASK 27-60-00-866-002).



EFF :
ALL
 27-64-51



AIJ




Page 448
Nov 01/10

Subtask 27-64-51-790-051
G. Leak Test
(1) Examine the servo control filter (2) for leaks.
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK.
_______
LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
(2) Safety the filter with MISCELLANEOUS (Material No. 19-010).
Subtask 27-64-51-866-060
H. Retract the Spoiler
(1) Retract the applicable spoiler (Ref. TASK 27-60-00-866-002).
(2) On the servo-control, turn the KEY-SPOILER MAINTENANCE
(98D27603002000) or the KEY-SPOILER MAINTENANCE (98D27603002001) in
the maintenance device to the operation position and then remove it.
Subtask 27-64-51-710-052
J. Test
(1) Do an operational test of the spoiler hydraulic actuation (Ref. TASK
27-64-00-710-001).
5. Close-up
________
Subtask 27-64-51-942-053
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-64-51



AIJ




Page 449
Nov 01/10

LIFT AUGMENTING (SLATS) - DESCRIPTION AND OPERATION


___________________________________________________
1. General
_______
A. System Configuration
The aircraft has five slats on the leading edge of each wing. Together
with the flaps (Ref. 27-50-00) they are used to increase lift. The slats
are installed on tracks which are attached to the leading edge of each
wing.
The slats are attached, at the forward end, to circular-arc tracks. The
tracks operate in guide rollers. Two tracks support each of the four
slats outboard of the engine pylon. Four tracks support the slat inboard
of the engine pylon. Two of the tracks inboard, and each of the tracks
outboard of the engine pylon, have curved rack gears fitted.
Each curved rack gear engages with a pinion. Plug-in rotary actuators
move the pinions. Power to the plug-in rotary actuators comes from the
transmission. An electrically controlled hydro-mechanical Power Control
Unit (PCU) gives power to move the transmission.
Two Slat/Flap Control Computers (SFCC1 and SFCC2) monitor and control the
slats. An Instrumentation Position Pick-Off Unit (IPPU) is installed on
the Power Control Unit (PCU). It sends signals to the Electronic
Instrument System (EIS), which identifies the position of the slats.
A Feedback Position Pick-Off Unit (FPPU) gives signals of the output
shaft position of the PCU. Two Asymmetry Position Pick-Off Units (APPU)
give signals of the slat position or speed. The SFCC1 and the SFCC2
receive and monitor the signals from the FPPU and the APPUs.
2. __________________
Component Location
(Ref. Fig. 001)
3. __________________
System Description
(Ref. Fig. 002)
A. Electrical Control and Monitoring (Ref. 27-81-00)
The electrical control and monitoring system of the slats has:
- a slat/flap control lever
- a Command Sensor Unit (CSU)
- two Slat/Flap Control Computers (SFCC)
- two electrically controlled valve blocks which are installed on the
slat Power Control Unit (PCU)



EFF :
ALL
 27-80-00



AIJ




Page 1
Feb 01/07

Slats - Component Location


Figure 001


EFF :
ALL
 27-80-00



AIJ




Page 2
Feb 01/07

Slat Control - Schematic


Figure 002


EFF :
ALL
 27-80-00



AIJ




Page 3
Feb 01/07

- a Feedback Position Pick-off-Unit (FPPU)


- two Asymmetry Position Pick-off-Units (APPU)
- two Wing Tip Brakes (WTB).
The slat and flap control lever controls the position of the slats. The
Command Sensor Unit (CSU) identifies the position of the slat and flap
control lever and sends related signals to each SFCC. Each SFCC controls
the valve block of a hydraulic motor, which is part of the slat PCU.
The FPPU, which is part of the slat PCU, and the two APPUs send related
signals to the SFCCs. If the SFCCs find a failure in the system, the Wing
Tip Brakes (WTB) stop and hold the transmission and the PCU is stopped.
NOTE : The SFCCs have a slat alpha lock/slat baulk function which
____
prevents the aircraft from stalling.
B. Hydraulic Actuation and Power Transmission (Ref. 27-84-00)
A hydro-mechanical PCU supplies mechanical power to the power
transmission system. The PCU has two separate hydraulic motors and two
Pressure-Off Brakes (POB). Each hydraulic motor has an electrically
controlled valve block, which receives signals from a SFCC.
Torque shafts and gearboxes in the fuselage and the wings transmit the
mechanical power from the slat PCU to the rotary actuators which move the
slats. Each slat has two rotary actuators, which are installed on the
tracks. Torque limiters in the transmission system and the rotary
actuators prevent the mechanical overload of the structure.
4. ____________
Power Supply
(Ref. Fig. 003)
5. Interface
_________
Not Applicable
6. _____________________
Component Description
Not Applicable



EFF :
ALL
 27-80-00



AIJ




Page 4
Feb 01/07

Hydraulic System - Schematic


Figure 003


EFF :
ALL
 27-80-00



AIJ




Page 5
Feb 01/07

7. ________________________________
Operation/Control and Indicating
(Ref. Fig. 002, 003)
A. Extension and Retraction of the Slats
The operation of the slats is hydro-mechanical. The PCU moves the
mechanical transmission system which operates the slats.
The CSU changes the mechanical signals from the slat and flap control
lever into electrical signals. These are sent to the SFCC1 and the SFCC2.
They compare the position signal with that from the FPPU. When there is a
difference between the signals, the SFCC sends a discrete signal to its
related valve block of the slat PCU.
Each valve block lets hydraulic fluid flow to and from its hydraulic
motor, in relation to the signal from the SFCC. It thus controls the
direction in which the hydraulic motor turns (for extension and
retraction of the slats) and its speed (low or high speed).
The torque from the hydraulic motors is transmitted to the differential
gearbox, which connects the two motors. The mechanical transmission
system then transmits the torque to the rotary actuators which moves the
slats.
B. Hydraulic Actuation and Power Transmission
The two hydraulic motors in the PCU give hydraulic actuation. Each
hydraulic motor gets power from a different system, green or blue.
Each hydraulic motor has its own valve block and POB. The valve blocks
control the direction of rotation and the speed of the output shaft of
the PCU. The POB holds the output shaft of the hydraulic motor:
- against torque from the airloads
- when there is a failure in its related hydraulic system
- to lock the transmission at the same time as the WTB.
The two hydraulic motors move the transmission system through a
differential gearbox. This causes the slat control surfaces to move to
the set position.
It is possible to operate the slat system, at half speed, if the failure
conditions listed below occur:
- loss of one electrical supply
- loss of one hydraulic system
- failure of one SFCC, or failure of one of two electrical components
- failure of one engine.



EFF :
ALL
 27-80-00



AIJ




Page 6
Feb 01/07

C. Asymmetry and Power Transmission Monitoring


The SFCC1 and the SFCC2 continuously compare position data from the APPUs
and the FPPU to monitor the system. They use this data to find asymmetry,
runaway and speed failure conditions.
The proximity switches of the slat disconnect detection system send
signals to the Landing-Gear Control Interface-Units (LGCIU). The LGCIUs
send signals to the SFCC1 and the SFCC2. If the slat movement is not in
the specified limits then the conditions listed below occur:
- the slat PCU is switched off
- a warning is sent to the flight crew.
D. Position Indicating
The upper display unit of the ECAM system shows the position of the
slats. Installed on the PCU is an IPPU which supplies flap position data.
The IPPU also gives data to the flight data recorder and the Flight
Warning System (FWC) (Ref. 27-85-00).
A visual check of the position of the slats can be done through the
windows in the fuselage that are adjacent to the slats. The windows to be
used are identified by a brown triangle on the sidewall panel above them.
8. BITE
_________
Test
(Ref. Fig. 004, 005)
The slat system has a Built-In Test Equipment (BITE). You can do tests of
the system through the Multipurpose Control and Display Unit (MCDU) in the
aircraft cockpit. The MCDU also indicates any failures in the system and
gives trouble shooting data for the system.



EFF :
ALL
 27-80-00


R 
AIJ




Page 7
Feb 01/07

MCDU System Displays - SFCC Test


Figure 004 (SHEET 1)


EFF :
ALL
 27-80-00



AIJ




Page 8
Feb 01/07

MCDU System Displays - SFCC Test


Figure 004 (SHEET 2)


EFF :
ALL
 27-80-00



AIJ




Page 9
Feb 01/07

MCDU System Displays - SFCC Test


Figure 004 (SHEET 3)


EFF :
ALL
 27-80-00



AIJ




Page 10
Feb 01/07

INTENTIONALLY BLANK




 27-80-00



AIJ




Page 11
Feb 01/07

MCDU System Displays - WTB/POB Test


Figure 005 (SHEET 1)


EFF :
ALL
 27-80-00



AIJ




Page 12
Feb 01/07

MCDU System Displays - WTB/POB Test


Figure 005 (SHEET 2)


EFF :
ALL
 27-80-00



AIJ




Page 13
Feb 01/07

LIFT AUGMENTING - MAINTENANCE PRACTICES


_______________________________________
TASK 27-80-00-866-004
Extending the Slats on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To extend the slats without movement of the flaps. To extend the slats and
flaps at the same time (Ref. TASK 27-50-00-866-00801).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-80-00



AIJ




Page 201
May 01/09

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-00-00-480-002
29-10-00-863-003
29-10-00-864-003
31-60-00-860-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
EIS Start Procedure

3. __________
Job Set-Up
Subtask 27-80-00-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the slat
system is in operation.
Subtask 27-80-00-860-052
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).
NOTE : The Blue and/or Green hydraulic system(s) operate(s) the slat
____
system. If necessary, use the alternative hydraulic system.
NOTE : If you use the Blue Hydraulic System, an ECAM S/CTL SLAT SYS 2
____
FAULT message will show. This message can be ignored.
NOTE : If you use the Green Hydraulic System, an ECAM S/CTL SLAT SYS
____
1 FAULT message will show. This message can be ignored.



EFF :
ALL
 27-80-00


R 
AIJ




Page 202
Feb 01/07

(3) Set the ECAM system to on (Ref. TASK 31-60-00-860-001).


Subtask 27-80-00-865-054
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-80-00-865-055
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-80-00-866-052
A. Extension of the Slats on the Ground
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
(1) Set the slat/flap control lever to position 1, 2 or FULL.
(2) Make sure that on the ECAM upper DU the slat position bar moves to
the correct position.



EFF :
ALL
 27-80-00


R 
AIJ




Page 203
Feb 01/07

R
R

(3) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) on the slat/flap control lever (Ref. TASK 27-00-00480-002).
5. Close-Up
________
Subtask 27-80-00-860-053
A. Aircraft Maintenance Configuration
(1) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(2) On the ECAM control panel, set the control/brightness controls to
OFF.
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-80-00-942-057
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00



AIJ




Page 204
May 01/09

TASK 27-80-00-866-007
Manual Extension of the Slats
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27803000000
98D27804001000
98D27804011000

1
2
1
1
1

circuit breaker(s) safety clip(s)


pneumatic right-angle wrench
safety barriers
warning notice
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
ADAPTOR-DRIVE, SLAT (AND FLAP)
BAR-TURNING



EFF :
ALL
 27-80-00



AIJ




Page 205
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
27-50-00-400-003
27-80-00-866-005
27-80-00-866-008
27-84-45-000-005
31-32-00-860-006
27-80-00-991-004

Energize the Ground Service Network from the External


Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Manual Retraction of the Slats
Removal of the Torque Shaft 6012CM(6062CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 201

3. __________
Job Set-up
Subtask 27-80-00-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position on the panel 114VU to tell persons
not to operate the flap/slat controls.
Subtask 27-80-00-860-060
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the


flap/slat control lever on panel 114VU.
(3) Energize the ground service network
(Ref. TASK 24-42-00-861-001).



EFF :
ALL
 27-80-00



AIJ




Page 206
May 01/09

(4) On the MCDU:


(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM DATA - the MCDU shows the slat SYSTEM DATA
SLT>
submenu.
4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
Subtask 27-80-00-865-065
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-80-00-010-052
D. Get Access
R

(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below


zones 191, 192.
(2) Remove the applicable access panels:
- on the left wing 521AB, 521BB, 521CB, 191BT
- on the left wing 621AB, 621BB, 621CB, 192BT



EFF :
ALL
 27-80-00



AIJ




Page 207
Feb 01/11

(3) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)


(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the torque shaft assy 6012CM
(6062CM)
- on the torque shaft, outboard of the torque shaft assy 6012CM
(6062CM).
(4) Remove the torque shaft assy 6012CM (6062CM) (Ref. TASK 27-84-45-000005).
4. Procedure
_________
(Ref. Fig. 201/TASK 27-80-00-991-004)
Subtask 27-80-00-866-058
A. Manual Extension of the Slats with Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
WARNING : BE CAREFUL TO PREVENT ACCIDENTAL MOVEMENT OF THE SLATS WHILE
_______
THEY ARE IN THE EXTENDED POSITION.
MOVEMENT OF THE SLATS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE
TO EQUIPMENT.
CAUTION : DO NOT LET THE SLATS TOUCH THE END STOPS WHILE YOU MANUALLY
_______
EXTEND AND RETRACT THE SLATS. THIS WILL PREVENT DAMAGE TO THE
END STOPS.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
(1) Install the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) on the
actuator 6013CM (6063CM) shaft.
(2) Install the pneumatic right-angle wrench on the ADAPTOR-DRIVE, SLAT
(AND FLAP).

(3) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft,
outboard of the torque shaft assy 6012CM (6062CM).
(4) Extend the slats with the ADAPTOR-DRIVE, SLAT (AND FLAP) and the
pneumatic right-angle wrench as necessary.



EFF :
ALL
 27-80-00



AIJ




Page 208
May 01/09

R
R

Slats - Manual Extension/Retraction


Figure 201/TASK 27-80-00-991-004



EFF :
ALL
 27-80-00



AIJ




Page 209
Feb 01/07

(5) Retract the slats as necessary (Ref. TASK 27-80-00-866-008).


Subtask 27-80-00-866-060
B. Manual Extension of the Slats without Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
WARNING : BE CAREFUL TO PREVENT ACCIDENTAL MOVEMENT OF THE SLATS WHILE
_______
THEY ARE IN THE EXTENDED POSITION.
MOVEMENT OF THE SLATS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE
TO EQUIPMENT.
CAUTION : DO NOT LET THE SLATS TOUCH THE END STOPS WHILE YOU MANUALLY
_______
EXTEND AND RETRACT THE SLATS. THIS WILL PREVENT DAMAGE TO THE
END STOPS.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
(1) Install the BAR-TURNING (98D27804011000) on the slat drive shaft
outboard of the actuator 6013CM (6063CM).
R

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft,
outboard of the torque shaft assy 6012CM (6062CM).
(3) Extend the slats with the BAR-TURNING as necessary.
(4) Retract the slats as necessary (Ref. TASK 27-80-00-866-008).



EFF :
ALL
 27-80-00



AIJ




Page 210
May 01/09

TASK 27-80-00-866-005
Retracting the Slats on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To retract the slats without movement of the flaps. To retract the slats and
flaps at the same time (Ref. TASK 27-50-00-866-00901).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
29-10-00-863-003
29-10-00-864-003
31-60-00-860-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
EIS Start Procedure



EFF :
ALL
 27-80-00



AIJ




Page 211
Feb 01/07

3. __________
Job Set-Up
Subtask 27-80-00-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the slat
system is in operation.
Subtask 27-80-00-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-80-00-860-054
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).
NOTE : The Blue and/or Green hydraulic system(s) operate(s) the slat
____
system. If necessary, use the alternative hydraulic system.
NOTE : If you use the Blue Hydraulic System, an ECAM S/CTL SLAT SYS 2
____
FAULT message will show. This message can be ignored.
NOTE : If you use the Green Hydraulic System, an ECAM S/CTL SLAT SYS
____
1 FAULT message will show. This message can be ignored.
(3) Set the ECAM system to on (Ref. TASK 31-60-00-860-001).



EFF :
ALL
 27-80-00


R 
AIJ




Page 212
Feb 01/07

Subtask 27-80-00-865-058
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-80-00-866-053
A. Retraction of the Slats on the Ground
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION.


(2) Set the slat/flap control lever to position 0.
(3) Make sure that on the ECAM upper DU the slat position bar moves to
the correct position.
5. Close-Up
________
Subtask 27-80-00-860-055
A. Aircraft Maintenance Configuration
(1) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(2) On the ECAM control panel, set the control/brightness controls to
OFF.
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-80-00



AIJ




Page 213
May 01/09

Subtask 27-80-00-865-059
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 14CC1, 14CC2.
Subtask 27-80-00-942-053
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barrier(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00


R 
AIJ




Page 214
Feb 01/07

TASK 27-80-00-866-008
Manual Retraction of the Slats
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
To manually retract the slats after they have been manually extended.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27804001000
98D27804011000

1
2
1
1

pneumatic right-angle wrench


safety barriers
warning notice
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
ADAPTOR-DRIVE, SLAT (AND FLAP)
BAR-TURNING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-866-007
27-84-45-400-006
27-80-00-991-004

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Manual Extension of the Slats
Installation of the Torque Shaft 6012CM(6062CM)
Fig. 201



EFF :
ALL
 27-80-00



AIJ




Page 215
Feb 01/11

3. __________
Job Set-up
Subtask 27-80-00-941-060
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position on the panel 114VU
to tell persons not to operate the flap/slat controls.
Subtask 27-80-00-860-061
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
attached to the flap/slat control lever on the panel 114VU.
R
R

(2) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position below zone 191, 192.
(3) Make sure that the torque shaft assy 6012CM (6062CM) is removed and
that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) is
installed inboard of the torque shaft assy.
(4) Make sure that the ground service network is energized
(Ref. TASK 24-42-00-861-001).
(5) On the MCDU, make sure that the PPU DATA page is shown.
Subtask 27-80-00-865-066
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-80-00



AIJ




Page 216
Feb 01/11

4. Procedure
_________
(Ref. Fig. 201/TASK 27-80-00-991-004)
Subtask 27-80-00-866-059
A. Manual Retraction of the Slats with Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : DO NOT LET THE SLATS TOUCH THE END STOPS WHILE YOU MANUALLY
_______
EXTEND AND RETRACT THE SLATS. THIS WILL PREVENT DAMAGE TO THE
END STOPS.
(1) On the MCDU, monitor the slats APPU position.
(2) Retract the slats to the 50 degrees APPU position with the ADAPTORDRIVE, SLAT (AND FLAP) (98D27804001000) and the pneumatic right-angle
wrench.
R

(3) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to the


torque shaft outboard of the torque shaft assy 6012CM (6062CM)
(Ref. TASK 27-50-00-400-003).
(4) Remove the pneumatic right-angle wrench from the ADAPTOR-DRIVE, SLAT
(AND FLAP).
(5) Remove the ADAPTOR-DRIVE, SLAT (AND FLAP) from the actuator shaft
6013CM (6063CM).
(6) Install the BAR-TURNING (98D27804011000) on the slat drive shaft
outboard of the actuator 6013CM (6063CM).

(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft
outboard of the torque shaft assy 6012CM (6062CM) (Ref. TASK 27-5000-000-003).
(8) Move the slat drive shaft until the PPU DATA on the MCDU shows the
same value as recorded before the manual extension.
(a) Use the BAR-TURNING to move the slat drive shaft.



EFF :
ALL
 27-80-00



AIJ




Page 217
May 01/09

(b) On the MCDU, compare the APPU and the FPPU angles (deg) with
those that were written down (or printed) before the manual
extension (Ref. TASK 27-80-00-866-007):
- the FPPU angle value as recorded before extension and after
retraction must agree within 0.1 deg.
- the APPU angle value as recorded before extension and after
retraction must agree within 0.1 deg.
- the FPPU and APPU angles (deg) must agree within 1.3 deg.
- the LH APPU and the RH APPU angles must agree within 0.45 deg.
R

(9) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to the


torque shaft outboard of the torque shaft assy 6012CM (6062CM)
(Ref. TASK 27-50-00-400-003).
(10) Remove the BAR-TURNING from the slat drive shaft.
(11) Install the torque shaft assy 6012CM (6062CM) (Ref. TASK 27-84-45400-006).
NOTE : It may be necessary to rotate the shaft outboard of the torque
____
shaft assy 6012CM (6062CM) to align the splined joint.

(12) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft
inboard and outboard of the torque shaft assy 6012CM (6062CM)
(Ref. TASK 27-50-00-000-003).
Subtask 27-80-00-866-061
B. Manual Retraction of the Slats without Pneumatic Wrench
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : DO NOT LET THE SLATS TOUCH THE END STOPS WHILE YOU MANUALLY
_______
EXTEND AND RETRACT THE SLATS. THIS WILL PREVENT DAMAGE TO THE
END STOPS.
(1) Move the slat drive shaft until the PPU DATA on the MCDU shows the
same value as recorded before the manual extension.
(a) Use the BAR-TURNING to move the slat drive shaft.



EFF :
ALL
 27-80-00



AIJ




Page 218
May 01/09

(b) On the MCDU, compare the APPU and the FPPU angles (deg) with
those that were written down (or printed) before the manual
extension (Ref. TASK 27-80-00-866-007):
- the FPPU angle value as recorded before extension and after
retraction must agree within 0.1 deg.
- the APPU angle value as recorded before extension and after
retraction must agree within 0.1 deg.
- the FPPU and APPU angles (deg) must agree within 1.3 deg.
- the LH APPU and the RH APPU angles must agree within 0.45 deg.
R

(2) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to the


torque shaft outboard of the torque shaft assy 6012CM (6062CM)
(Ref. TASK 27-50-00-400-003).
(3) Remove the BAR-TURNING from the slat drive shaft.
(4) Install the torque shaft assy 6012CM (6062CM) (Ref. TASK 27-84-45400-006).
NOTE : It may be necessary to rotate the shaft outboard of the torque
____
shaft assy 6012CM (6062CM) to align the splined joint.

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft
inboard and outboard of the torque shaft assy 6012CM (6062CM)
(Ref. TASK 27-50-00-000-003).
5. Close-up
________
Subtask 27-80-00-865-067
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV, 14CC1, 14CC2
Subtask 27-80-00-410-051
B. Close Access
(1) Close the access panels:
- on the left wing, close 521AB, 521BB, 521CB, 191BT
- on the right wing, close 621AB, 621BB, 621CB, 192BT
(2) Remove the access platform(s).
(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-80-00



AIJ




Page 219
May 01/09

Subtask 27-80-00-860-062
C. Aircraft Configuration
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on the panel 114VU.
(2) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
Subtask 27-80-00-942-059
D. Close-up
(1) Remove the warning notice(s).
(2) Remove the safety barriers.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00



AIJ




Page 220
May 01/09

TASK 27-80-00-866-006
Reset of the Torque Limiters of the Slat System on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
1 ACCESS PLATFORM 4M (13 FT)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-84-00-710-001
29-10-00-863-003
29-10-00-864-003
27-80-00-991-002

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Slat System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Blue Hydraulic System
Fig. 202



EFF :
ALL
 27-80-00



AIJ




Page 221
Feb 01/11

3. __________
Job set up
Subtask 27-80-00-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the slat system.
Subtask 27-80-00-010-050
B. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the applicable
access panel.
(2) Remove the applicable access panel(s) to gain access to the torque
limiter(s):
for the slat No.1 Torque Limiters:
521CB, 521EB
621CB, 621EB
for the slat No.2 Torque Limiters:
522AB, 522CB
622AB, 622CB
for the slat No.3 Torque Limiters:
522FB, 522HB, 522JB, 522KB
622FB, 622HB, 622JB, 622KB
for the slat No.4 Torque Limiters:
522NB, 522QB
622NB, 622QB
for the slat No.5 Torque Limiters:
522SB, 522UB
622SB, 622UB.



EFF :
ALL
 27-80-00



AIJ




Page 222
Feb 01/11

Subtask 27-80-00-865-061
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-80-00-865-062
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-80-00-860-056
E. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Blue hydraulic system
(Ref. TASK 29-10-00-863-003).
NOTE : The Blue and/or the Green hydraulic system(s) operate(s) the
____
slat system. If necessary, use the alternative hydraulic
system.
NOTE : If you use the Blue Hydraulic System, an ECAM S/CTL SLAT SYS 2
____
FAULT message will show. This message can be ignored.
NOTE : If you use the Green Hydraulic System, an ECAM S/CTL SLAT SYS
____
1 FAULT message will show. This message can be ignored.



EFF :
ALL
 27-80-00


R 
AIJ




Page 223
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 202/TASK 27-80-00-991-002)


Subtask 27-80-00-866-056
A. Reset of the Torque Limiters of the Slat System on the Ground
(1) Release the load from the torque limiter(s) and allow the indicators
to be closed, as follows:
(a) Put the slat/flap control lever to the last position that had
been set, before the torque limiter(s) operated.
(2) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-80-00-865-063
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-80-00-866-057
C. Complete the Reset of the Torque Limiters
(1) Push each applicable indicator (1) down so that it aligns with the
torque limiter, in the usual system condition.
Subtask 27-80-00-710-051
D. Operational Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).



EFF :
ALL
 27-80-00



AIJ




Page 224
Feb 01/07

R
R

Torque Limiters - Detail and Location


Figure 202/TASK 27-80-00-991-002



EFF :
ALL
 27-80-00



AIJ




Page 225
Feb 01/07

5. Close-up
________
Subtask 27-80-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel(s) removed to gain access to the
torque limiter(s):
for the slat No.1 Torque Limiters:
521CB, 521EB
621CB, 621EB
for the slat No.2 Torque Limiters:
522AB, 522CB
622AB, 622CB
for the slat No.3 Torque Limiters:
522FB, 522HB, 522JB, 522KB
622FB, 622HB, 622JB, 622KB
for the slat No.4 Torque Limiters:
522NB, 522QB
622NB, 622QB
for the slat No.5 Torque Limiters:
522SB, 522UB
622SB, 622UB.
Subtask 27-80-00-865-064
B. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-80-00


R 
AIJ




Page 226
Feb 01/07

Subtask 27-80-00-860-057
C. Aircraft Maintenance Configuration
(1) Install the safety collars on the circuit breakers 9CV and 11CV.
(2) Depressurize the Blue hydraulic system
(Ref. TASK 29-10-00-864-003).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-80-00-942-054
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00


R 
AIJ




Page 227
Feb 01/07

TASK 27-80-00-400-001
Installation of the Hoisting Sling
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
98D27803000000
98D27804009001

safety barriers
warning notices
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
1 SLATS - SLING

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-80-00-991-001

Extending the Slats on the Ground


Fig. 203



EFF :
ALL
 27-80-00



AIJ




Page 228
May 01/09

3. __________
Job Set-up
Subtask 27-80-00-941-056
A. Safety Precautions
(1) Put a warning notices in position to tell persons not to operate the
slat controls.
(2) Put the safety barriers in position.
Subtask 27-80-00-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866004).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the slat/flap control lever on the panel 114VU.
4. Procedure
_________
(Ref. Fig. 203/TASK 27-80-00-991-001)
Subtask 27-80-00-480-050
A. Installation of the Hoisting Sling
(1) Remove and discard the patch (8) from the hoisting points.
(2) Remove the blanking caps from the slat.
(3) Remove the pip-pins (4) and the lifting lugs (5) from the hoisting
sling.
(4) Install the lifting lugs (5) in the slat.

(5) Attach the SLATS - SLING (98D27804009001) to a hoist with a capacity


of 41kg (90lb).
(6) Use the hoist to position the sling over the slat.
(7) Make sure that the clevis (6) is in the correct position to attach to
the lifting lugs (5).



EFF :
ALL
 27-80-00



AIJ




Page 229
May 01/09

R
R

Hoisting Sling
Figure 203/TASK 27-80-00-991-001



EFF :
ALL
 27-80-00



AIJ




Page 230
Feb 01/07

(8) Lower the hoisting sling until it can be attached to the lifting lugs
(5).
(9) Connect the clevis (6) to the lifting lugs (5) with the pip-pins (4).
(10) Put the trailing edge block (7) in position on the trailing edge of
the slat.
(11) If necessary, loosen the nut (2) and adjust the turnbuckle (1) to get
the correct angle to do the lift.
5. Close-up
________
Subtask 27-80-00-942-055
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00


R 
AIJ




Page 231
Feb 01/07

TASK 27-80-00-000-001
Removal of the Hoisting Sling
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27803000000

safety barriers
warning notices
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

R
R

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

11-00-00-400-022
27-80-00-866-004

Installation of the Hoisting Point Cover Patches


Extending the Slats on the Ground

27-80-00-991-001

Fig. 203



EFF :
ALL
 27-80-00



AIJ




Page 232
Aug 01/11

3. __________
Job Set-up
Subtask 27-80-00-941-057
A. Safety Precautions
(1) Make sure that the warning notices are in position to tell persons
not to operate the slat controls.
(2) Make sure that the safety barriers are in position.
Subtask 27-80-00-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the slat/flap control lever on panel 114VU.
4. Procedure
_________
(Ref. Fig. 203/TASK 27-80-00-991-001)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
Subtask 27-80-00-080-050
A. Removal of the Hoisting Sling
(1) Remove the trailing edge block (7) from the trailing edge of the
slat.
(2) Remove the pip-pins (4) and disconnect the SLATS - SLING from the
slat.
(3) Remove the lifting lugs (5) from the slat and connect them to the
hoisting sling with the pip-pins (4).



EFF :
ALL
 27-80-00


R 
AIJ




Page 233
Aug 01/11

(4) Remove the hoisting sling from the hoist.


(5) Install the blanking caps in the slat. Make sure that the top of the
blanking caps are not above the surface of the slat.
R
R
R

(6) Do the Installation of the Hoisting Sling Cover Patches (Ref. TASK
11-00-00-400-022).
5. Close-up
________
Subtask 27-80-00-942-056
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00



AIJ




Page 234
Aug 01/11

TASK 27-80-00-869-004
Reset of the Wing Tip Brake (WTB) of the Slat System on the Ground
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-80-00-866-006
27-84-00-710-001
29-10-00-863-001
29-10-00-863-002
29-10-00-863-003

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Reset of the Torque Limiters of the Slat System on
the Ground
Operational Test of the Slat System
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply



EFF :
ALL
 27-80-00


R 
AIJ




Page 235
Aug 01/11

INTENTIONALLY BLANK



R

 27-80-00



AIJ




Page 236
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
31-32-00-860-006

Depressurize
Depressurize
Depressurize
Procedure to
F/CTL Page

the
the
the
Get

Green Hydraulic System


Yellow Hydraulic System
Blue Hydraulic System
Access to the SYSTEM REPORT/TEST

3. __________
Job Set-up
Subtask 27-80-00-941-061
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons that the slat system
is in operation.
(3) Open the circuit breakers that follow in step B. BEFORE you energize
the aircraft electrical circuits.
NOTE : It is important to do this to make sure that the FACs cannot
____
go into the Return to Low speed mode during SLAT WTB Reset
procedure.
Subtask 27-80-00-865-073
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-80-00-860-063
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.



EFF :
ALL
 27-80-00


R 
AIJ




Page 237
Feb 01/11

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).


(2) Make sure that the Green, the Yellow and the Blue hydraulic systems
are depressurized (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00864-002) (Ref. TASK 29-10-00-864-003).
(3) Get access to the flight controls (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
Subtask 27-80-00-865-068
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-80-00-869-060
A. Reset of the Wing Tip Brake (WTB) of the Slat System on the Ground
NOTE : Use any available MCDU to do the reset of the wing tip brake.
____
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. Open the C/B 7CV.

- SFCC 2 is isolated.

2. On the MCDU:
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

3. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 menu.



EFF :
ALL
 27-80-00



AIJ




Page 238
Feb 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------4. On the MCDU:
On the MCDU:
- push the line key < SLT
- the MCDU shows the SFCC 1 SLAT
TEST/RESET.
TEST/RESET menu.
5. On the MCDU:
- push the line key WTB-RESET >.

On the MCDU:
- the MCDU shows the SFCC 1 SLAT
WTB-RESET procedure.

6. On the MCDU:
- push the line key < START WTB
RESET.

On the MCDU:
- the MCDU shows: SFCC 1 SLAT WTB-RESET
PERFORMED.

7. If the reset of the WTB is not


performed and no SFCC fault is
displayed, do the steps that
follow:
- open the C/Bs 5CV, 6CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- wait five seconds.
- close the C/Bs 5CV, 6CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- repeat steps 2 thru 6 again.
8. Close the C/B 7CV.

- SFCC 2 is energized.

9. Open the C/B 5CV.

- SFCC 1 is isolated.

10. On the MCDU:


- push the line key < SFCC 2.

On the MCDU:
- the MCDU shows the SFCC 2 menu.

11. On the MCDU:


- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 2 menu.

12. On the MCDU:


- push the line key < SLT
TEST/RESET.

On the MCDU:
- the MCDU shows the SFCC 2 SLAT
TEST/RESET menu.

13. On the MCDU:


- push the line key WTB-RESET >.

On the MCDU:
- the MCDU shows the SFCC 2 SLAT
WTB-RESET procedure.

14. On the MCDU:

On the MCDU:



EFF :
ALL
 27-80-00



AIJ




Page 239
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- push the line key < START WTB
- the MCDU shows: SFCC 2 SLAT WTB-RESET
RESET.
PERFORMED.
15. If the reset of the WTB is not
performed and no SFCC fault is
displayed, do the steps that
follow:
- open the C/Bs 6CV, 7CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- wait five seconds.
- close the C/Bs 6CV, 6CV, 8CV,
9CV, 10CV, 11CV and 12CV.
- repeat steps 10 thru 14 again.
16. Close the C/B 5CV.
17. On the MCDU:
- push the line key < RETURN
frequently until the CFDS MENU
page is shown.
18. Pressurize the Green, Yellow and
Blue hydraulic systems
(Ref. TASK 29-10-00-863-001)
(Ref. TASK 29-10-00-863-002)
(Ref. TASK 29-10-00-863-003).
19. Move the slat and flap control
lever in the slat extension and
retraction direction.
20. Check all the slat system torque
limiters and reset as necessary
(Ref. TASK 27-80-00-866-006).
Subtask 27-80-00-710-052
B. Operational Test
(1) Do the Operational Test of the Slat System (Ref. TASK 27-84-00-710001).



EFF :
ALL
 27-80-00


R 
AIJ




Page 240
Feb 01/07

5. Close-up
________
Subtask 27-80-00-860-064
A. Aircraft Configuration
(1) Depressurize the aircraft hydraulic systems
(Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK
29-10-00-864-003).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-80-00-865-074
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R
R
R
R
R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-80-00-942-060
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-80-00



AIJ




Page 241
May 01/10

SLATS ELECTRICAL CONTROL AND MONITORING - DESCRIPTION AND OPERATION


___________________________________________________________________
1. General
_______
The electrical control and monitoring system of the slats has:
- a manually operated slat/flap control lever
- a Command Sensor Unit (CSU) 51CV
- two Slat and Flap Control Computers (SFCC1 and SFCC2) 21CV, 22CV
- two electrically controlled valve blocks 25CV(26CV) installed on the slats
Power Control Unit (PCU) 6001CM (Ref. 27-84-00)
- a Feedback Position Pick-Off Unit (FPPU) 28CV
- two Asymmetry Position Pick-Off Units (APPU) 31CV(32CV)
- two Wing Tip Brakes (WTB) 35CV(36CV).
The functions of the slats electrical control and monitoring system are:
- to control the valve blocks electrically
- to control the WTBs electrically
- to receive data from and send data to the related systems
- to monitor the power transmission for correct operation
- to monitor the control system and power transmission for component failure
- to monitor the inputs from and outputs to the related systems.
The system has a Built-In Test Equipment (BITE).
The slat/flap control lever controls the position of the slats. The CSU
identifies the position of the slat/flap control lever and sends related
signals to each SFCC. Each SFCC controls a valve block of a hydraulic motor,
which is part of the slat PCU.
The two SFCCs monitor the operation of the transmission system. The FPPU
(which is part of the slats PCU) and the two APPUs send signals to the
SFCCs. They identify component failures of the transmission system and the
control system. The Pressure-Off Brakes (POB) of the PCU and the WTBs stop
and hold the transmission system when a failure occurs.



EFF :
ALL
 27-81-00



AIJ




Page 1
Feb 01/07

2. Component
__________________
Location
(Ref. Fig. 001, 002, 003)
-----------------------------------------------------------------------------FIN
I
FUNCTIONAL DESIGNATION
I PANELIZONEIACCESS I
ATA
I
I
I
I DOOR I
REF.
------------------------------------------------------------------------------SLAT AND FLAP CONTROL LEVER
114VU
27-51-43
21CV
SFCC1
85VU 127 824
27-51-34
22CV
SFCC2
86VU 128 824
27-51-34
25CV
PCU VALVE BLOCK 1
148
27-84-53
26CV
PCU VALVE BLOCK 2
148
27-84-53
28CV
FEEDBACK POSITION PICK-OFF UNIT
148
27-81-19
31CV
ASYMMETRY POSITION PICK-OFF UNIT
522 522UB
27-81-18
32CV
ASYMMETRY POSITION PICK-OFF UNIT
622 622UB
27-81-18
35CV
WING TIP BRAKE
522 522SB
27-81-51
36CV
WING TIP BRAKE
622 622SB
27-81-51
51CV
COMMAND SENSOR UNIT
114VU 220 811
27-51-17
90CV
RELAY
187VU 121
92CV
RELAY
188VU 122
94CV
RELAY
187VU 121
96CV
RELAY
188VU 122
3. __________________
System Description
A. Mechanical Input
The slat/flap control lever is installed in the cockpit on panel 114VU.
There are five possible positions for the lever (identified as 0,1,2,3
and FULL). The lever position to the related flight phase, flap angle and
the slat angle is as follows:
------------------------------------------------------------------------------LEVER
FLAP
SLAT
POSITION
FLIGHT PHASE
ANGLE (deg)
ANGLE (deg)
------------------------------------------------------------------------------0
Cruise
0
0
1*
Hold (Lowspeed)
0
18
1*
Take-off
10
18
2
Take-off
15
22
3
Take-off /Approach
20
22
FULL
Land
35
27
* Flap auto-command function
-------------------------------------------------------------------------------



EFF :
ALL
 27-81-00



AIJ




Page 2
Feb 01/07

Component Location
Figure 001


EFF :
ALL
 27-81-00



AIJ




Page 3
Feb 01/07

Component Location
Figure 002


EFF :
ALL
 27-81-00



AIJ




Page 4
Feb 01/07

Slat System Electrical Equipment - Component Location


Figure 003


EFF :
ALL
 27-81-00



AIJ




Page 5
Feb 01/07

The slat/flap control lever has two baulks. One baulk between position 1
and 2, and one between position 3 and FULL. The baulks prevent a
one-movement-change of the lever position from FULL to 0. The lever turns
a shaft which moves the input shaft of the CSU through spur gears.
B. Electrical Control
(Ref. Fig. 004)
The CSU is installed in the cockpit, immediately below the slat and flap
control lever on the panel 114VU. The CSU changes the mechanical signals
from the control lever into electrical signals to the SFCC1 and SFCC2.
The two SFCCs are installed in racks in the forward avionics compartment.
The SFCCs have power supplies with no relation between them. Each SFCC
has the same function and includes one flap channel and one slat channel.
The slat channels each control one of the two valve blocks on the slats
PCU. Each valve block has its own different hydraulic supply (Ref.
27-84-00).
There are three solenoid valves at each valve block. For the low speed
mode, the SFCCs energize the retract/extend solenoid valves and the POB
solenoid. For the high speed mode, the SFCCs energize the extend solenoid
valve and the POB solenoid. The POB solenoid permits the release of the
POB of the hydraulic motor (Ref. 27-84-00).
An FPPU, which is attached to the PCU, sends signals on the position of
the slat transmission to the two SFCCs. The PCU gearbox moves the FPPU.
The FPPU has two synchro transmitters, which are the same. One sends
signals to the SFCC1, the other one to the SFCC2.
C. Wing Tip Brake (WTB) Control
(Ref. Fig. 005)
The WTB is an electro-hydraulic pressure-on brake. It is installed near
the end of the transmission system in each wing. The WTBs stop and hold
the transmission if the SFCCs find some given types of failures. Each WTB
has two solenoid valves. Each solenoid valve controls one part of a WTB.
The WTBs have different hydraulic supplies. The Blue hydraulic system
supplies one solenoid valve and the Green hydraulic system supplies the
other solenoid valve.
Power is supplied to the WTB solenoids through the SFCCs. Each SFCC
supplies and controls one solenoid on each WTB. When the WTBs operate,
the transmission locks. The circuit can only be reset (set back) on the
ground through the Centralized Fault Display System (CFDS). The two SFCCs
control the LH and the RH WTB.



EFF :
ALL
 27-81-00



AIJ




Page 6
Feb 01/07

Slats Electrical Control - Schematic


Figure 004


EFF :
ALL
 27-81-00



AIJ




Page 7
Feb 01/07

Wing Tip Brake (WTB) Control - Schematic


Figure 005

EFF :
ALL





AIJ




27-81-00

Page 8
Feb 01/07

D. Monitoring
(Ref. Fig. 006)
The two SFCCs monitor the slat system continuously for failures in:
- the operation of the power transmission system
- the Line Replaceable Units (LRU)
- the input and output signals
- the power supplies.
Failures in the slat system will not give, but may lead to class 1 level
3 warnings which are generated by the Electronic Centralized Aircraft
Monitoring (ECAM) system.
The ECAM system shows class 1, level 1 and level 2 cautions to the flight
crew (Ref. 31-50-00). The SFCCs supply failure data to the ECAM system
through:
- the System Data Acquisition Concentrators (SDAC) (Ref. 31-55-00)
- the Flight Warning Computers (FWC) (Ref. 31-53-00)
- the Display Management Computers (DMC) (Ref. 31-62-00).
The ECAM gives a Maintenance Status Reminder for class 2 failures.
The SFCCs supply all the related data of failures to the Centralized
Fault Display System (CFDS).
(1) Monitoring of the Power Transmission Systems
The SFCCs monitor the power transmission system for these failures:
- asymmetry (a position difference between the two APPUs)
- runaway (a position difference between the APPUs and the FPPU)
- uncommanded movement (a movement in the wrong direction, or a
movement away from the last set position)
- overspeed (the faster movement of one or more PPUs)
- system jam
- half speed
- low hydraulic pressure
- control valve position.
To monitor the power transmission system, the SFCCs compare the CSU
signals with the position data. The SFCCs receive the position data
from:
- the two APPUs
- the FPPU
- the valve blocks.



EFF :
ALL
 27-81-00



AIJ




Page 9
Feb 01/07

Slat Transmission Monitoring - Schematic


Figure 006


EFF :
ALL
 27-81-00



AIJ




Page 10
Feb 01/07

An APPU is installed at the end of the transmission system in each


wing. The APPUs are the same as, and interchangeable with, the FPPU.
One synchro transmitter in each APPU sends position data to the
SFCC1. The other synchro transmitter in each APPU sends position data
to the SFCC2.
The control valve of each valve block has a Linear Variable
Differential Transducer (LVDT) (Ref. 27-54-00). The LVDT sends valve
position data to its related SFCC. The position of the valve is
directly related to the hydraulic pressure available at the valve
block.
(2) LRU Monitoring
The SFCCs monitor these LRUs for failures:
- SFCC1 and SFCC2
- the CSU
- the two WTBs
- the two APPUs
- the FPPU
- the valve blocks of the slat PCU.
The SFCCs keep the data related to the failures in their memories.
(3) Monitoring of Input and Output Signals
The SFCCs monitor these input and output signals:
- the ARINC 429 inputs from other systems
- the ARINC 429 inputs from the cross-computer link (other SFCC)
- the installation coding
- the operation mode codings
- the ground inhibit
- the ARINC 429 outputs (wraparound)
If the above signals are not in the specified limits, the SFCCs keep
the data related to the failure in its memory. The SFCCs transmit the
data to the CFDS.
Other discrete inputs are:
- the Aircraft On Ground (AOG) discrete
- the WTB-arm input.
(4) Monitoring of Power Supplies
The SFCCs monitor these power supplies:
- the SFCC DC Supply
- the WTB DC Supply



EFF :
ALL
 27-81-00



AIJ




Page 11
Feb 01/07

- the synchro excitation power generated by the SFCCs


- the LVDT synchro excitation power generated by the SFCCs.
If the voltage is not in the specified limits, the SFCCs keep the
data related to the failure in its memory.
The SFCCs transmit the data to the CFDS. If the SFCC DC supply or the
synchro excitation power is not in the specified limits, the flight
crew get a failure indication.
4. Power
____________
Supply
(Ref. Fig. 007)
The electrical power supplies for the slat control and monitoring system
are:
- the essential bus 401PP
- the normal bus 202PP
- the battery buses 701PP and 702PP.
The essential bus 401PP supplies:
- the SFCC1 slat channel
- the related PCU solenoids
- the synchro and LVDT excitation voltages.
The battery bus 701PP supplies the WTB solenoids related to the SFCC1.
The normal bus 202PP supplies:
- the SFCC2 slat channel
- the related PCU solenoids
- the synchro and LVDT excitation voltages.
The battery bus 702PP supplies the WTB solenoids related to the SFCC2.
If the WTBs are operated, the battery buses keep the solenoids energized
during a SFCC power failure.
5. __________
Interfaces
(Ref. Fig. 008, 009, 010)
6. _____________________
Component Description
A. Refer
- the
- the
- the

to (Ref. 27-51-00) for data on:


Slat and Flap Control Lever
CSU
SFCC.



EFF :
ALL
 27-81-00



AIJ




Page 12
Feb 01/07

Power Supply Distribution - Schematic


Figure 007

EFF :
ALL
 27-81-00




AIJ




Page 13/14
Feb 01/07

Slat System Components - Interfaces


Figure 008


EFF :
ALL
 27-81-00



AIJ




Page 15
Feb 01/07

Slat System Interfaces - Data to Other Systems


Figure 009


EFF :
ALL
 27-81-00



AIJ




Page 16
Feb 01/07

Slat System Interfaces - Data from Other Systems


Figure 010


EFF :
ALL
 27-81-00



AIJ




Page 17
Feb 01/07

B. Valve Block
(Ref. Fig. 011)
The valve block is the same as the valve block of the flaps PCU. Refer to
(Ref. 27-51-00) for data on the valve block.
C. Feedback Position Pick-off Unit (FPPU)
(Ref. Fig. 012)
The slats FPPU is the same as the flaps FPPU. Refer to (Ref. 27-51-00)
for data on the FPPU.
D. Asymmetry Position Pick-off Unit (APPU)
(Ref. Fig. 013)
The two APPUs are the same as, and interchangeable with, the FPPU. Refer
to (Ref. 27-51-00) for data on the FPPU.
E. Adapter Plate
(Ref. Fig. 014)
An adapter plate, attached to the wing structure, connects the APPU to
the slat transmission system.
F. Wing Tip Brake
(Ref. Fig. 015)
The slats WTB is the same as the flaps WTB. Refer to (Ref. 27-51-00) for
data on the WTB.
7. Operation/Control
________________________________
and Indicating
(Ref. Fig. 016)
A. Normal Operation
(1) System Requirements
For the normal operation of the slats:
- energize the aircraft electrical network
- close the circuit breakers 5CV, 7CV, 9CV and 11CV
- pressurize the Blue hydraulic system for the slat system 1 and the
Green hydraulic system for the slat system 2.



EFF :
ALL
 27-81-00



AIJ




Page 18
Feb 01/07

Valve Block
Figure 011


EFF :
ALL
 27-81-00



AIJ




Page 19
Feb 01/07

Feedback Position Pick-off Unit


Figure 012


EFF :
ALL
 27-81-00



AIJ




Page 20
Feb 01/07

Asymmetry Position Pick-Off Unit


Figure 013


EFF :
ALL
 27-81-00



AIJ




Page 21
Feb 01/07

Adapter Plate
Figure 014


EFF :
ALL
 27-81-00



AIJ




Page 22
Feb 01/07

Wing Tip Brake


Figure 015


EFF :
ALL
 27-81-00



AIJ




Page 23
Feb 01/07

Slats - Normal Operation


Figure 016


EFF :
ALL
 27-81-00



AIJ




Page 24
Feb 01/07

NOTE : For safety, the circuit breakers 9CV and 11CV have a red guard
____
installed to prevent incorrect operation during flight. To
open the circuit breakers it is necessary to remove the
applicable red guard first.
(2) Manual Control
The slat and flap control lever controls the position of the slats.
When the lever is moved to a new position, the slats move to the
indicated slat angle.
NOTE : The slats will not move when the slat and flap control lever
____
moves from position 2 to 3 , or 3 to 2. As a function of the
lever position, the flaps can move.
(3) Electrical Control
The CSU sends discrete signals to the slat channel of each SFCC. At
the same time, the CSU sends discrete signals for the flap position
to the flap channel. The switch pattern of the CSU changes when the
control lever moves. This causes the SFCC to get different signals
(Ref. Table 2). Each slat channel receives signals from two sets of
the 5-track switches in the CSU. For a correct signal, each channel
must receive the same detent pattern from the two sets of switches.
For a permitted out-of-detent pattern, each channel must receive the
same out-of-detent pattern from the two sets of switches.
If a different configuration occurs, it is a CSU failure.
------------------------------------------------------------------------------LEVER
POSITION
0
1
2
3
FULL
------------------------------------------------------------------------------TRACK 1
XXXXX
XXXXX
TRACK 2
XXXXXXXXXXX
TRACK 3
XXXXXXXXXX
TRACK 4
XXXXXXXXXXX
TRACK 5
XXXXXXXXXXXXX
------------------------------------------------------------------------------SLAT ANGLE
0
18
22
22
27
------------------------------------------------------------------------------FLAP ANGLE
0
10
15
20
35
------------------------------------------------------------------------------Lever Position and Switch Pattern
Table 2



EFF :
ALL
 27-81-00


R 
AIJ




Page 25
Feb 01/07

The SFCC memory keeps the last correct signal, which controls the
slat and flap position. The SFCCs compare a new CSU signal with the
slat position signal which comes from the FPPU. If a change of slat
angle is necessary, the PCU solenoids get electrical power. The slats
move towards the new position (Ref. 27-54-00). When the position data
from the FPPU is the same as the CSU signal, the slats stop.
NOTE : Slat and flap movement always obeys the last correct control
____
lever movement. For example, when the lever moves from
position 3 to FULL, the slats will extend in the direction of
the FULL position. If the lever returns to position 3 before
the slats reach position FULL, the direction of slat movement
changes and the slats move back to position 3.
B. Slat Alpha Lock/Speed Baulk
The Air Data/Inertial Reference Units (ADIRU) supply corrected
angle-of-attack (alpha) and computed air speed (CAS) data to the SFCC.
The SFCC use the data to prevent slat retraction at high alpha and/or low
CAS. Slat retraction is not possible if:
- the alpha is more than 8.5 deg.
- the CAS is less than 148 knots.
The function resets if alpha decreases below 7.6 deg. or CAS increases
over 154 knots.
Alpha lock/speed baulk is not possible if:
- the slat retraction is set before alpha is more than 8.5 deg. or CAS
less than 148 knots
- the aircraft is on the ground with CAS below 60 knots.
When the function is active, the ECAM shows the message A LOCK (green,
flashing) above the slat position indication (Ref. 27-85-00).
C. Operation of the Wing Tip Brake
(Ref. Fig. 017)
The WTBs lock the transmission system if some given types of failure
occur that requires it to lock the WTBs.
(1) If one or the other lane of the slat channel finds a failure:
- the lane arms its own WTB circuits
- the other channel receives a WTB-arm discrete signal.



EFF :
ALL
 27-81-00


R 
AIJ




Page 26
Feb 01/07

Wing Tip Brake Logic


Figure 017


EFF :
ALL
 27-81-00



AIJ




Page 27
Feb 01/07

(2) If one or the other lane in the second slat channel also finds the
failure:
- the lane arms its own WTB circuits
- the first channel receives a WTB-arm discrete signal.
When the SFCCs receive a WTB-arm signal they energize the related WTB
solenoid valves. The WTBs lock the transmission system.
If one SFCC does not operate, the other SFCC receives a WTB-arm
signal automatically. If the other SFCC finds some given types of
failure, one solenoid valve on each WTB gets electrical power.
(3) Reset
The WTB can only be reset on the ground through the CFDS.
D. Monitoring for Failure Conditions
(1) Monitoring of the Power Transmission System
The SFCCs monitor:
- the slat position data from the APPUs and the FPPU
- the rate of change of the slat position data
- the selected position from the CSU.
The SFCCs use this data to find:
- an asymmetry
- a runaway
- an uncommanded movement
- an overspeed.
When the SFCCs find any one of these failures:
- the valve block solenoids on the PCU are de-energized
- the POBs are applied and stop their related hydraulic motors
- each channel arms its own WTB circuits and sends a WTB-arm signal
to the other channel
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display unit
shows a failure message.
When the WTBs have locked the system, reset is only possible on the
ground.
(2) System Jam
The SFCC will find a system jam if the system speed is below 2%
nominal for more than 4 seconds.
When the SFCCs find a system jam:



EFF :
ALL
 27-81-00



AIJ




Page 28
Feb 01/07

- the valve block solenoids on the PCU are de-energized


- the POBs are applied and stop their related hydraulic motors
- the SFCCs give a class 1 level 2 caution and the ECAM display unit
shows a failure message.
If the SFCCs receive a new correct CSU signal, the SFCCs go back to
their normal operation.
If there is low hydraulic pressure, the SFCCs stop system jam
monitoring.
(3) LRU Monitoring
(a) SFCC1 and SFCC2
Each lane of each slat channel receives output signals from the
other lane in the same channel. Each lane compares these signals
with its own output signals. If there is a difference for more
than 320 milliseconds and minor failure steps are taken:
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the other channel receives a WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the slats operate at half speed.
If the failure resets within 5 seconds, the channel returns to
its normal operation. The SFCCs cancel the caution and the
WTB-arm signal. If the failure is still there after 5 seconds
then a major failure step is taken:
- the SFCC arms the WTB for the defective channel.
The major failure step is also taken if 10 minor failures occur
within 3 minutes.
If there is a failure in the two slat channels:
- the solenoids on the two valve blocks are de-energized
- the POBs lock their related hydraulic motor
- the WTB for the two channels lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message
- the slats do not operate until reset on the ground.
(b) CSU
The SFCCs monitor the CSU signals for the correct detent or
out-of-detent switch patterns.



EFF :
ALL
 27-81-00



AIJ




Page 29
Feb 01/07

If the SFCCs receive an incorrect pattern for more than 0.5


seconds:
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the SFCCs give a level 1 caution and the ECAM display unit
shows a failure message.
If the SFCCs receive an out-of-detent pattern for more than 10
seconds:
- the SFCCs give a class 1 level 2 caution after the slats are at
the last set position
- the ECAM display unit shows a failure message.
If a CSU disadjust failure is detected:
- the solenoids on the two valve blocks are de-energized
- the POBs lock their related hydraulic motor
- each channel arms its own WTB and sends a WTB-arm signal to the
other channel
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message
- the slats do not operate until reset on the ground.
(c) WTB
Each slat channel monitors its related WTB solenoids for open
circuit or short circuit. If there is a failure with the correct
WTB power available:
- the ECAM display unit shows a failure message.
(d) PPU
If one slat channel finds failures because of PPU differences,
but does not receive the WTB-arm signal from the other channel:
- the SFCC will find a failure in one synchro of the related PPU
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the related channel arms its WTB
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the slats operate at half speed.



EFF :
ALL
 27-81-00


R 
AIJ




Page 30
Feb 01/07

(e) Valve Blocks


1
_

LVDT
Each slat channel monitors its related LVDT for the correct
operation. If there is a failure, the SFCCs memory keeps the
related data and sends it to the CFDS. If the failure stops
the operation of the motor:
- the SFCCs give a class 1 level 1 caution and the ECAM
display unit shows a failure message
- the slats operate at half speed.

2
_

Solenoid Valves
Each slat channel monitors the position of the solenoid valves
on its related valve block. The slat channels use the signals
from the LVDT to compare the position of the control valve
with that commanded. If a valve does not close after a signal:
- the channel will not try to drive the motor when the SFCC
gets DC power
- the SFCCs give a class 1 level 1 caution and the ECAM
display unit shows a failure message
- the slats operate at half speed.

3
_

Hydraulic Pressure
Each slat channel monitors the hydraulic pressure available to
move its related motor. It uses signals from the LVDT to
compare the position of the control valve with that commanded
(Ref. 27-54-00). If there is low pressure:
- the SFCCs give a class 1 level 1 caution and the ECAM
display unit shows a failure message
- the slats operate at half speed.
When hydraulic pressure goes back to its normal condition:
- the SFCCs and the ECAM system cancel the class 1 level 1
caution and the failure message
- the slats operate at normal speed.
If low pressure is detected the SFCCs stop system jam
monitoring.



EFF :
ALL
 27-81-00



AIJ




Page 31
Feb 01/07

(f) Hydraulic Motors


Each slat channel monitors the transmission system for half speed
operation when there is a hydraulic motor jam. The half speed
monitor operates only when the valves of the two valve blocks are
in the full speed position. If the slat movement is slower than
the minimum speed for two-motor operation:
- the SFCCs give a class 1 level 1 caution after 8 seconds and
the ECAM display unit shows a failure message
- the slats operate at half speed.
When the aircraft is on the ground, half speed monitoring stops.
(4) Monitoring of Input and Output Signals
(a) ARINC 429 Inputs from other Systems
Each slat channel monitors ARINC 429 inputs from the Air
Data/Inertial Reference Unit (ADIRU).
(b) ARINC 429 Input from Cross-Computer Link
Each slat channel monitors the other slat channel for the correct
operation. If there is no data for more than 10 seconds, the CFDS
gets a failure message.
(c) Installation Coding
Each slat channel monitors its installation code inputs. If they
find an incorrect coding:
- all ARINC 429 outputs, for that channel, change to no computed
data
- the CFDS gets a failure message.
(d) Operation Mode Coding
Each slat channel monitors its operation mode coding inputs. If
they find an incorrect coding:
- the ARINC 429 slat and flap system status changes to no
computed data
- the solenoids on the related valve block are de-energized
- the POBs lock their related hydraulic motor
- the related channel arms its WTB
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the slats operate at half speed.



EFF :
ALL
 27-81-00



AIJ




Page 32
Feb 01/07

If the channel receives the WTB-arm signal from the other


channel:
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message.
Reset is only possible on the ground.
(e) ARINC 429 Outputs (Wraparound)
Each slat channel monitors its ARINC 429 outputs. Wraparound
inputs get the output data. If there is a difference, the related
output stops and the CFDS gets a failure message.
(5) Monitoring of Power Supplies
(a) SFCC DC Supply
Each slat channel monitors its primary 28V DC supply and its
internal secondary power supply. If the primary power supply goes
below 15V DC, or the internal secondary power supply does not
operate:
- the solenoids on the related valve block are de-energized
- the POB locks the related motor
- the other channel receives the WTB-arm signal
- the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the slats operate at half speed.
NOTE : The failed channel does not arm the WTB in case of
____
interruption of all aircraft DC power. This is to stop the
WTB locking the system at the same time when the DC power
fails.
(b) WTB DC Supply
Each slat channel monitors the special power supply for its WTB.
If the WTB power input goes below 15V DC:
- the ECAM display unit shows a failure message
- the CFDS gets a failure message.
(c) Synchro Excitation Power
Each slat channel monitors the correct synchro excitation power.
The internal secondary DC power supplies the synchro excitation
power. If the voltages or frequency are not correct:
- the solenoids on the related valve block are de-energized



EFF :
ALL
 27-81-00


R 
AIJ




Page 33
Feb 01/07

the POB locks the related motor


the channel arms the related WTB
the other channel receives a WTB-arm signal
the SFCCs give a class 1 level 1 caution and the ECAM display
unit shows a failure message
- the slats operate at half speed.
If the synchro excitation power goes back to the correct value,
the slats will operate as normal. If the other channel receives
the WTB-arm signal:
- the WTBs lock the transmission system
- the SFCCs give a class 1 level 2 caution and the ECAM display
unit shows a failure message.
Reset is only possible on the ground.
E. Failure Table
------------------------------------------------------------------------------MONITORED
ECAM MESSAGE
WARNING
MOTOR
SYSTEM
FAILURE
-----------------------------STATUS
STATUS
E/W CRT
SYS/STATUS CRT
------------------------------------------------------------------------------Asymmetry.
FLT CTL
INOP SYS
CAUTION
The two
Stopped.
Runaway.
SLATS LOCKED
SLATS CAT 3
+
stopped
No reset
Overspeed.
WING TIP BRK ON
Single
in flight
Uncommanded
MAX SPEED...
chime
movement.
CSU
MAX SPEED ...
LDG DIST=x1.1*
mechanical
CAT 2 ONLY
failure
------------------------------------------------------------------------------System
FLT CTL
INOP SYS
CAUTION
The two
Stopped.
jam.
SLATS FAULT
CAT 3 SLATS
+
stopped
Reset if
The two Slat MAX. SPEED...
LOG DIST...
Single
failure
Channels
SLATS LEVER...
CAT 2 ONLY
chime
disappfailed
...RECYCLE
INCREASED FUEL
ears
CONSUMP
CSU failure
(valid outof-detent
for more than
10 seconds)
------------------------------------------------------------------------------Slats not in CONFIG
WARNING
T.O.
SLATS NOT IN
+
config.
T.O. CONFIG
CIRC



EFF :
ALL
 27-81-00


R 
AIJ




Page 34
Feb 01/07

------------------------------------------------------------------------------MONITORED
ECAM MESSAGE
WARNING
MOTOR
SYSTEM
FAILURE
-----------------------------STATUS
STATUS
E/W CRT
SYS/STATUS CRT
------------------------------------------------------------------------------------------------------------------------------------------------------------Slat Channel FLT CTL
SLATS SLOW
Stopped
1/2
failure
SLATS SYS 1(2)
speed
CSU failure
FAULT
(invalid
pattern)
PPU Synchro.
LVDT.
Valve Block
Solenoid.
Low hydraulic
pressure.
Operation
Mode Coding.
SFCC DC
supply
synchro excitation supply.
------------------------------------------------------------------------------Hydraulic
SLATS SLOW
Stopped 1/2
Motor jam
speed
------------------------------------------------------------------------------WTB supply.
FLT CTL
WTB solenoid SLAT TIP BRK FAULT
------------------------------------------------------------------------------ARINC 429
Input/Output.
Installation
Coding
------------------------------------------------------------------------------* Depending on the slat and flap position.
F. Parameter List
Refer to 27-51-00 for data on the parameter list.
8. BITE
____
Not Applicable



EFF :
ALL
 27-81-00


R 
AIJ




Page 35
Feb 01/07

SLATS ELECTRICAL CONTROL AND MONITORING - DEACTIVATION/REACTIVATION


___________________________________________________________________
TASK 27-81-00-040-001
Deactivation of the SFCC 2 Slat WTB Solenoids
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-81-01-A)
Slat Wing Tip Brakes Solenoids
(Old MMEL ref: 27-81-01)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-81-00-710-001

Operational Test of the Wing-Tip Brake and the


Pressure-Off Brake



EFF :
ALL
 27-81-00



AIJ




Page 401
May 01/11

3. __________
Job Set-up
Subtask 27-81-00-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the slat system.
4. Procedure
_________
Subtask 27-81-00-865-070
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-81-00-040-050
B. Deactivation of the SFCC 2 WTB Solenoids
(1) Do a test to make sure that the channel 1 of the wing tip brakes is
serviceable (Ref. TASK 27-81-00-710-001).
(2) Put the warning notice in the cockpit to tell the flight crew that
one or two of the SFCC 2 slat WTB solenoids are deactivated.
(3) Make an entry in the aircraft technical logbook to record the
deactivation of the SFCC 2 slat WTB solenoids.
Subtask 27-81-00-865-073
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
7CV, 8CV



EFF :
ALL
 27-81-00


R 
AIJ




Page 402
Nov 01/10

Subtask 27-81-00-869-056
D. Cockpit Effects
(1) On the upper ECAM display the message F/CTL SLAT TIP BRK FAULT may
be shown.
5. Close-up
________
Subtask 27-81-00-942-056
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00


R 
AIJ




Page 403
Nov 01/10

TASK 27-81-00-440-001
Reactivation of the SFCC 2 Slat WTB Solenoids
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MMEL TASK: 27-81-01-A)
Slat Wing Tip Brakes Solenoids
(Old MMEL ref: 27-81-01)

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

3. __________
Job Set-up
Subtask 27-81-00-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the slat system.



EFF :
ALL
 27-81-00



AIJ




Page 404
May 01/11

4. Procedure
_________
Subtask 27-81-00-440-050
A. Reactivate the SFCC 2 Slat WTB Solenoids
(1) Do the trouble-shooting of the WTB solenoids and do the applicable
correction(s) (Ref. TSM 27). Use the Fault Symptom(s) as entry into
the Trouble Shooting Manual (TSM).

R
R

(2) Make an entry in the aircraft technical logbook to record the


reactivation of the SFCC 2 WTB solenoids.
5. Close-up
________
Subtask 27-81-00-942-057
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00



AIJ




Page 405
May 01/09

SLATS ELECTRICAL CONTROL AND MONITORING - ADJUSTMENT/TEST


_________________________________________________________
R

TASK 27-81-00-740-001
Read-out for Class 3 Faults in the Slat System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------31-32-00-869-002

Procedure for Class 3 Faults Reading



EFF :
ALL
 27-81-00



AIJ




Page 501
Feb 01/07

3. __________
Job Set-up
Subtask 27-81-00-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slats.
4. Procedure
_________
Subtask 27-81-00-869-051
A. Read-out for Class 3 Faults in the Slat System
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______
BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
(1) Read for class 3 faults in the slat system (Ref. TASK 31-32-00-869002).
5. Close-up
________
Subtask 27-81-00-942-054
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00


R 
AIJ




Page 502
Feb 01/07

TASK 27-81-00-740-002
Bite Test of the Slat and Flap Control Computers (Slat System)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
NOTE : IGNORE ALL THE ECAM WARNINGS WHEN THE COMPUTER IS IN THE MENU MODE.
____
1. __________________
Reason for the Job
Self Explanatory
NOTE : Refer to SIL 27-116 for SFCC In-Service Standards and SFCC
____
combinations.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
31-32-00-860-006

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page



EFF :
ALL
 27-81-00



AIJ




Page 503
Feb 01/07

3. __________
Job Set-up
Subtask 27-81-00-941-060
A. Safety Precautions
(1) Put a warning notice in position to tell persons not to operate the
slat system.
Subtask 27-81-00-860-053
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST F/CTL page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
Subtask 27-81-00-865-055
C. Make sure that this(these) circuit breaker(s) is(are) closed:

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/FLP/SYS2
12CV
P20
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU HYDRAULIC/LGCIU/SYS2
2GA
Q35
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/FLP/SYS1
10CV
S07
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-81-00



AIJ




Page 504
Feb 01/07

4. Procedure
_________
Subtask 27-81-00-740-050
A. BITE Test of the Slat and Flap Control Computers (Slat System)
NOTE : Use the Multipurpose Control Display Unit (MCDU) 2 on panel 11VU
____
for the test.
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the Multipurpose Control
Display Unit (MCDU):
- push the line key < SFCC 1.

On the MCDU:
- the MCDU shows the SFCC 1 menu.

2. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 menu.

3. On the MCDU:
- push the line key < SLT
TEST/RESET.

On the MCDU:
- the MCDU shows the SFCC 1 SLAT
TEST/RESET menu.

4. On the MCDU:
- push the line key < SFCC TEST.

On the MCDU:
- the MCDU shows SFCC 1
SLAT SFCC TEST
IN PROGRESS
- for a positive test result the MCDU
shows SFCC 1 SLAT SFCC TEST
NO FAULTS
- for a negative test result, the MCDU
shows SFCC 1
SLAT SFCC TEST
PERFORMED WITH FAULT
< FAULT DATA
(push the line key < FAULT DATA to
show the failure data)
- if the test finds a peripheral fault,
the MCDU shows SFCC 1
SLAT TEST
NO FAULTS BUT
(for a peripheral fault see the
display below).

5. On the MCDU:



EFF :
ALL
 27-81-00



AIJ




Page 505
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------- push the line key < RETURN
frequently until the MCDU shows
the SYSTEM REPORT/TEST
F/CTL menu.
6. On the MCDU:
- push the line key < SFCC 2.

On the MCDU:
- the MCDU shows the SFCC 2 menu.

7. Do the SFCC test as described


above with the SFCC 2 menu.
8. On the MCDU:
- push the line key < RETURN
frequently until the CFDS menu
page is shown.
------------------------------------------------------------------------------|
If there is a peripheral fault, the SFCC TEST RESULT
|
| page will be shown on the CFDS.
|
|-----------------------------------------------------------------------------|
|
|
|
SFCC 1
|
|
SLAT SFCC TEST
|
|
DATE:XXX XX UTC:XXXX
|
|
1L -|NO FAULTS BUT
-|1R
|
|
|
|
|
|
2L -|*
-|2R
|
|
|
|
|
|
3L -|**
-|3R
|
|
|
|
|
|
4L -|
-|4R
|
|
|
|
|
|
5L -|
-|5R
|
|
|
|
|
|
6L -|<RETURN
PRINT> -|6R
|
|
|
------------------------------------------------------------------------------NOTE : * If the X-computer arm test is not done during the TEST these
____
words will be shown:



EFF :
ALL
 27-81-00


R 
AIJ




Page 506
May 01/11

R
R
R
R
R

------------------------------------------------------------------------------|
2L -|OTHER SFCC ARM SIGNAL|- 2R
|
|
|NOT TESTED
|
|
------------------------------------------------------------------------------NOTE : ** Shows one or more of the peripheral faults or a system is not
____
complete as follows:

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

------------------------------------------------------------------------------|
either
|WTB SET
|
|
|------------------|---------------------|------------------------------------|
|
and/or
|NO WTB POWER
|
|
|------------------|---------------------|------------------------------------|
|
and/or
|LH WTB SOLENOID X/X |
|
|------------------|---------------------|------------------------------------|
|
and/or
|RH WTB SOLENOID X/X |
|
|------------------|---------------------|------------------------------------|
|
and/or
|FPPU FAULT
|
|
|------------------|---------------------|------------------------------------|
|
and/or
|LH APPU FAULT
|
|
|------------------|---------------------|------------------------------------|
|
and/or
|RH APPU FAULT
|
|
------------------------------------------------------------------------------NOTE : X/X shows S/C short circuit or O/C open circuit.
____
5. Close-up
________
Subtask 27-81-00-860-054
A. Aircraft Configuration
(1) On the MCDU, push the key adjacent to the <CFDS indication until the
CFDS menu pages come into view.
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).



EFF :
ALL
 27-81-00



AIJ




Page 507
May 01/10

Subtask 27-81-00-942-060
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00


R 
AIJ




Page 508
May 01/10

TASK 27-81-00-710-001
Operational Test of the Wing-Tip Brake and the Pressure-Off Brake
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
1. __________________
Reason for the Job
Refer to the MPD TASK: 278100-03
NOTE : If you do this task together with MPD-TASK 278100-04, do MPD-TASK
____
278100-04 after this operational test.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices



EFF :
ALL
 27-81-00


R 
AIJ




Page 509
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-51-00-750-001
27-80-00-869-004
29-10-00-863-003
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
29-23-00-863-001
29-24-00-863-001
31-32-00-860-006
27-81-00-710-002
27-81-00-710-003

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Automatic Integrity Test of the Slat and Flap Control
Computers
Reset of the Wing Tip Brake (WTB) of the Slat System
on the Ground
Pressurize the Blue Hydraulic System with the Blue
Electric Pump
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Pressurize the Green Hydraulic System from the Yellow
Hydraulic System through the PTU with the Electric
Pump
Pressurize the Yellow Hydraulic System with the
Electric Pump
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Operational Test of the Wing-Tip Brake and the
Pressure-Off Brake with the Ground Power Cart (for
corrective action)
Operational Test of the Wing-Tip Brake and the
Pressure-Off Brake with the Engine Driven Pumps (for
corrective action)

3. __________
Job Set-Up
Subtask 27-81-00-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in position to tell persons that the slat and
flap systems are in operation.



EFF :
ALL
 27-81-00


R 
AIJ




Page 510
May 01/10

Subtask 27-81-00-860-052
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
(4) Do the automatic integrity test of the two SFCCs, which includes
Slat and Flap BITE tests of the two computers (Ref. TASK 27-51-00750-001).
(5) If the result of the BITE test indicates no faults but the WTB is
applied, reset the WTB (Ref. TASK 27-80-00-869-004).
Subtask 27-81-00-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-81-00-865-057
D. Make sure that this(these) circuit breaker(s) is(are) closed:

R
R

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-81-00



AIJ




Page 511
May 01/10

Subtask 27-81-00-860-050
E. Aircraft Maintenance Configuration
(1) Pressurize the Yellow and the Blue hydraulic systems with the
electric pumps (Ref. TASK 29-24-00-863-001) (Ref. TASK 29-10-00-863003).
(2) Pressurize the Green hydraulic system from the Yellow hydraulic
system through the Power Transfer Unit (PTU) with the electric pump
(Ref. TASK 29-23-00-863-001).
4. Procedure
_________
Subtask 27-81-00-710-051
A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
NOTE : When you do this test the slat surfaces will move automatically.
____
(1) Make sure that the CFDS is not in the SFCC menu mode before you start
the test. The test will not operate, if a BITE test was completed
before. Subsequently Pin Prog Fault will be shown.
(2) Test
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
NOTE : This test is only possible
____
with one SFCC.



EFF :
ALL
 27-81-00



AIJ




Page 512
May 01/11

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------2. Set the Slat and Flap control
The Slats and Flaps move to the
lever to the position 3.
position 3.
3. On the MCDU:
- push the line key < SFCC 1 (2).

On the MCDU:
- the MCDU shows the SFCC 1 (2) menu.

NOTE : Use the SFCC 2 to do this test again for the WTB 35CV-B and 36CV-B.
____
4. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 (2) menu.

5. On the MCDU:
- push the line key < SLT
TEST/RESET.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
TEST/RESET menu.

6. On the MCDU:
- push the line key < WTB/POB
TEST.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
WTB/POB TEST instructions.

7. On the MCDU:
- push the line key < CONTINUE.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 (2) SLAT WTB/POB TEST
instructions.

8. On the MCDU:
- push the line key < START TEST.

ON the MCDU:
- the MCDU shows that the SLAT WTB/POB
TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
On the MCDU:
- the MCDU shows in less than 2 minutes
SFCC 1 (2)
PERFORMED
NO FAULTS
RESULT NOT STORED
- if the MCDU shows
PERFORMED UNSUCCESSFULLY
do the steps 2 thru 8 again a maximum
of three times



EFF :
ALL
 27-81-00


R 
AIJ




Page 513
May 01/10

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- if the MCDU continues to show
PERFORMED UNSUCCESSFULLY
do the full test procedure with a
Ground Power Cart (Ref. TASK 27-8100-710-002) or
the Engine Driven Pumps (Ref. TASK
27-81-00-710-003).
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
does not operate, this message
is shown:
Pin Prog Fault.
9. If the Wing Tip Brake and the
Pressure Off Brake does not
operate:
- Push the < RETURN key
frequently to show the CFDS
menu page. Do the test again
after the menu mode is shown.
10. On the MCDU:
- push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
11. Make sure that the WTBs are not
set.
12. On the panel 49VU:
- open the circuit breakers 5CV
and 6CV (flap and slat system
1).
13. On the panel 121VU:
- close the circuit breakers 7CV
and 8CV (flap and slat system
2).
14. Use the SFCC 2 to do this test
again.



EFF :
ALL
 27-81-00


R 
AIJ




Page 514
May 01/10

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------15. On the MCDU:
- push the line key < RETURN
frequently until the CFDS menu
is shown.
16. On the panel 49VU:
- close the circuit breakers 5CV
and 6CV (flap and slat system
1).
17. Set the Slat and Flap control
lever to the position 0.
5. Close-Up
________
Subtask 27-81-00-865-054
A. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-81-00-860-051
B. Aircraft Configuration
(1) De-pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-10-00-864-002) and (Ref. TASK 29-1000-864-003).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-81-00-942-051
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).



EFF :
ALL
 27-81-00


R 
AIJ




Page 515
May 01/10

(3) Remove the safety barriers.


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00


R 
AIJ




Page 516
May 01/10

TASK 27-81-00-710-002
Operational Test of the Wing-Tip Brake and the Pressure-Off Brake with the
Ground Power Cart
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-51-00-750-001

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Automatic Integrity Test of the Slat and Flap Control
Computers



EFF :
ALL
 27-81-00



AIJ




Page 517
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-869-004
29-10-00-863-001
29-10-00-863-003
29-10-00-864-001
29-10-00-864-003
29-23-00-863-002
29-24-00-864-001
31-32-00-860-006

Reset of the Wing Tip Brake (WTB) of the Slat System


on the Ground
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Pressurize the Yellow Hydraulic System from the Green
Hydraulic System through the PTU with the Ground
Service Cart
Depressurize the Yellow Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page

3. __________
Job Set-up
Subtask 27-81-00-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in postion to tell persons that the slat and
flap systems are in operation.
Subtask 27-81-00-860-055
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
(4) Do the automatic integrity test of the two SFCCs, which includes
Slat and Flap BITE tests of the two computers (Ref. TASK 27-51-00750-001).



EFF :
ALL
 27-81-00


R 
AIJ




Page 518
May 01/10

(5) If the result of the BITE test indicates no faults but the WTB is
applied, reset the WTB (Ref. TASK 27-80-00-869-004).
R

Subtask 27-81-00-865-074

R
R
R
R
R
R

C. Open, safety and tag this(these) circuit breaker(s):


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-81-00-865-064

D. Make sure that this(these) circuit breaker(s) is(are) closed:


------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-81-00-860-063

E. Aircraft Maintenance Configuration


(1) Pressurize the Green and the Blue hydraulic systems with the ground
power cart (Ref. TASK 29-10-00-863-001) and (Ref. TASK 29-10-00-863003).
(2) Pressurize the Yellow hydraulic system from the Green hydraulic
system through the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-863002).
4. Procedure
_________
Subtask 27-81-00-710-060
A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-81-00



AIJ




Page 519
May 01/10

CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
NOTE : Use the Multipurpose Control Display Unit (MCDU) 3 on panel 1VU
____
for the test. If the MCDU 3 is defective, use the MCDU 2 on panel
11VU.
NOTE : When you do this test the slat surfaces will move automatically.
____
(1) Make sure that the CFDS is not in the SFCC menu mode before you start
the test. The test will not operate, if a BITE test was completed
before. Subsequently Corrupted RAM - Return On Line - or Pin Prog
Fault will be displayed.
(2) Test
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
2. Set the Slat and Flap control
lever to the position 3.

The Slats and Flaps move to the


position 3.

3. On the MCDU:
- push the line key < SFCC 1 (2).

On the MCDU:
- the MCDU shows the SFCC 1 (2) menu.

NOTE : Use the SFCC 2 to do this test again for the WTB 35CV-B and 36CV-B.
____
4. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 (2) menu.

5. On the MCDU:
- push the line key < SLT
TEST/RESET.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
TEST/RESET menu.

6. On the MCDU:
- push the line key < WTB/POB
TEST.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
WTB/POB TEST instructions.



EFF :
ALL
 27-81-00



AIJ




Page 520
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------7. On the MCDU:
On the MCDU:
- push the line key < CONTINUE.
- the MCDU shows the next page of the
SFCC 1 (2) SLAT WTB/POB TEST
instructions.
8. On the MCDU:
- push the line key < START TEST.

ON the MCDU:
- the MCDU shows that the SLAT WTB/POB
TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
On the MCDU:
- the MCDU shows in less than 2 minutes
SFCC 1 (2)
PERFORMED
NO FAULTS
RESULT NOT STORED
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
will not operate, the subsequent
message(s) is (are) displayed:
Corrupted RAM - Return On Line,
or Pin Prog Fault.
9. If the Wing Tip Brake and the
Pressure Off Brake will not
operate:
- Push the < RETURN key frequently
to show the CFDS menu page. Do
the test again after the menu
mode is displayed.
10. On the MCDU:
- push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
11. Make sure that the WTBs are not
set.



EFF :
ALL
 27-81-00


R 
AIJ




Page 521
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------12. On the panel 49VU:
- open the circuit breakers 5CV
and 6CV (flap and slat system
1).
13. On the panel 121VU:
- close the circuit breakers 7CV
and 8CV (flap and slat system
2).
14. Use the SFCC 2 to do this test
again.
15. On the MCDU
Push the line key < RETURN
frequently until the CFDS menu
page is shown.
16. On the panel 49VU:
- close the circuit breakers 5CV
and 6CV (flap and slat system
1).
17. Set the Slat and Flap control
lever to the position 0.
5. Close-up
________
Subtask 27-81-00-865-065
A. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18



EFF :
ALL
 27-81-00


R 
AIJ




Page 522
May 01/11

Subtask 27-81-00-860-061
B. Aircraft Configuration
(1) De-pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-24-00-864-001) and (Ref. TASK 29-1000-864-003).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 27-81-00-942-058
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00


R 
AIJ




Page 523
May 01/10

TASK 27-81-00-710-003
Operational Test of the Wing-Tip Brake and the Pressure-Off Brake with the
Engine Driven Pumps
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notices

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-38-00-710-001
24-41-00-861-002
24-41-00-862-002
27-51-00-750-001

Operational Test of the Battery Charge Limiter (BCL),


(without the CFDS)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Automatic Integrity Test of the Slat and Flap Control
Computers



EFF :
ALL
 27-81-00


R 
AIJ




Page 524
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-869-004
29-10-00-864-001
29-10-00-864-002
29-10-00-864-003
31-32-00-860-006

Reset of the Wing Tip Brake (WTB) of the Slat System


on the Ground
Depressurize the Green Hydraulic System
Depressurize the Yellow Hydraulic System
Depressurize the Blue Hydraulic System
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page

71-00-00-710-028

Engine Shutdown

R
3. __________
Job Set-up
Subtask 27-81-00-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notices in postion to tell persons that the slat and
flap systems are in operation.
Subtask 27-81-00-860-058
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Make sure that the aircraft batteries are fully charged (Ref. TASK
24-38-00-710-001).
(3) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
(4) Do the automatic integrity test of the two SFCCs, which includes
Slat and Flap BITE tests of the two computers (Ref. TASK 27-51-00750-001).
(5) Make sure that the Wing Tip Brakes (WTBs) are not set (Ref. TASK 2780-00-869-004).



EFF :
ALL
 27-81-00



AIJ




Page 525
May 01/11

Subtask 27-81-00-865-075
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-81-00-865-067
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-81-00-865-068
E. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FWS/FWC1/SPLY
3WW
F01
121VU CFDS/CFDIU/SPLY
2TW
J18
121VU CFDS/CFDIU/BACK/UP
8TW
J17
121VU EIS/FWC2/SPLY
2WW
Q07
Subtask 27-81-00-860-064
F. Procedure to Get Access to the CFDS SYSTEM REPORT/TEST (F/CTL) Page on
the MCDU
NOTE : Use the above circuit breaker table with this procedure.
____
(1) Start chrono.
(2) After 40 seconds close the circuit breakers 2TW and 8TW.
(3) Wait for CFDS initialization (GMT is displayed on the lower ECAM).



EFF :
ALL
 27-81-00


R 
AIJ




Page 526
May 01/11

(4) Close circuit breaker 3WW.


(5) In case of no access, retry again. Ignore all warnings related to
FWC1.
(6) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the MCDU
(Ref. TASK 31-32-00-860-006).
4. Procedure
_________
Subtask 27-81-00-710-059
A. Operational Test of the Wing Tip Brake and the Pressure-Off Brake
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
NOTE : Use the Multipurpose Control Display Unit (MCDU) 3 on panel 1VU
____
for the test. If the MCDU 3 is defective, use the MCDU 2 on panel
11VU.
NOTE : When you do this test the slat surfaces will move automatically.
____
(1) Make sure that the CFDS is not in the SFCC menu mode before you start
the test. The test will not operate, if a BITE test was completed
before. Subsequently Corrupted RAM - Return On Line - or Pin Prog
Fault will be displayed.
(2) Test
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the panel 121VU:
- open the circuit breakers 7CV
and 8CV (flap and slat system
2).
2. Set the Slat and Flap control
lever to the position 3.

The Slats and Flaps move to the


position 3.



EFF :
ALL
 27-81-00



AIJ




Page 527
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------3. On the MCDU:
On the MCDU:
- push the line key < SFCC 1 (2). - the MCDU shows the SFCC 1 (2) menu.
NOTE : Use the SFCC 2 to do this test again for the WTB 35CV-B and 36CV-B.
____
4. On the MCDU:
- push the NEXT PAGE button.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 (2) menu.

5. On the MCDU:
- push the line key < SLT
TEST/RESET.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
TEST/RESET menu.

6. On the MCDU:
- push the line key < WTB/POB
TEST.

On the MCDU:
- the MCDU shows the SFCC 1 (2) SLAT
WTB/POB TEST instructions.

7. On the MCDU:
- push the line key < CONTINUE.

On the MCDU:
- the MCDU shows the next page of the
SFCC 1 (2) SLAT WTB/POB TEST
instructions.

8. On the MCDU:
- push the line key < START TEST.

ON the MCDU:
- the MCDU shows that the SLAT WTB/POB
TEST is IN PROGRESS.

NOTE : If the line key < START


____
TEST is not shown, do the
instructions the MCDU
shows.
On the MCDU:
- the MCDU shows in less than 2 minutes
SFCC 1 (2)
PERFORMED
NO FAULTS
RESULT NOT STORED
NOTE : When the test of the Wing Tip
____
Brake and the Pressure Off Brake
will not operate, the subsequent
message(s) is (are) displayed:
Corrupted RAM - Return On Line,
or Pin Prog Fault.



EFF :
ALL
 27-81-00


R 
AIJ




Page 528
May 01/11

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------9. If the Wing Tip Brake and the
Pressure Off Brake will not
operate:
- Push the < RETURN key frequently
to show the CFDS menu page. Do
the test again after the menu
mode is displayed.
10. On the MCDU:
- push the line key < RETURN
frequently until the SYSTEM
REPORT/TEST - F/CTL menu is
shown.
11. Make sure that the WTBs are not
set.
12. On the panel 49VU:
- open the circuit breakers 5CV
and 6CV (flap and slat system
1).
13. On the panel 121VU:
- close the circuit breakers 7CV
and 8CV (flap and slat system
2).
14. Use the SFCC 2 to do this test
again.
15. On the MCDU
Push the line key < RETURN
frequently until the CFDS menu
page is shown.
16. On the panel 49VU:
- close the circuit breakers 5CV
and 6CV (flap and slat system
1).
17. Set the Slat and Flap control
lever to the position 0.



EFF :
ALL
 27-81-00


R 
AIJ




Page 529
May 01/11

5. Close-up
________
Subtask 27-81-00-865-069
A. Close this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
Subtask 27-81-00-860-060
B. Aircraft Configuration
(1) Stop operation of the engines:
(a) Decrease both engines to MIN IDLE for five minutes.
R

(b) Do the Engine Shutdown Procedure (Ref. TASK 71-00-00-710-028).


(2) De-pressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
29-10-00-864-001), (Ref. TASK 29-10-00-864-002) and (Ref. TASK 29-1000-864-003).
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(4) Close the circuit breaker 2WW.
Subtask 27-81-00-942-059
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the safety barriers.
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00



AIJ




Page 530
May 01/11

TASK 27-81-00-820-001
Manual Adjustment of the Position Pick-Off Units
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

safety barriers

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-51-00-820-001

Manual Adjustment of the Position Pick-Off Units

3. __________
Job Set-up
Subtask 27-81-00-941-055
A. Safety Precautions
(1) Put the safety barriers in position.



EFF :
ALL
 27-81-00


R 
AIJ




Page 531
May 01/11

INTENTIONALLY BLANK



R

 27-81-00



AIJ




Page 532
May 01/11

4. Procedure
_________
Subtask 27-81-00-820-050
A. Manual Adjustment of the Position Pick-Off Units
(1) Set the mechanical zero position of the Position Pick-Off Unit
(Ref. TASK 27-51-00-820-001).
5. Close-up
________
Subtask 27-81-00-942-055
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-00



AIJ




Page 533
May 01/10

POSITION PICK OFF UNIT - ASYMMETRY (APPU) (31CV,32CV) - REMOVAL/INSTALLATION


____________________________________________________________________________
R

TASK 27-81-18-000-001
Removal of the Asymmetry-Position Pick-Off Unit 31CV (32CV)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
98D27803500001

blanking caps
circuit breaker(s) safety clip(s)
safety barriers
tie-wrap
warning notice
access platform 4 m (13 ft. 1 in.)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-80-00-866-005
27-81-18-991-001

Retracting the Slats on the Ground


Fig. 401



EFF :
ALL
 27-81-18



AIJ




Page 401
Feb 01/07

3. __________
Job Set-up
Subtask 27-81-18-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat system.
Subtask 27-81-18-860-050
B. Aircraft Maintenance Configuration
(1) If you replace the APPU, fully retract the slats (Ref. TASK 27-80-00866-005).
NOTE : An APPU is self-locking and you can install it when the
____
flap/slat system is not at zero, if:
- you are to install the same APPU and its position is not
changed
- there is no movement of the flap/slat system during the time
the APPU is removed.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control-lever.
(3) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-81-18-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-81-18


R 
AIJ




Page 402
Feb 01/07

Subtask 27-81-18-010-050
D. Get Access
(1) Put the access platform in position:
- FOR 31CV
below zone 510
- FOR 32CV
below zone 610.
(2) Remove the applicable access panel:
- FOR 31CV
remove 522UB
- FOR 32CV
remove 622UB.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-81-18-991-001)


Subtask 27-81-18-020-050
A. Remove the Assymetry-Position Pick-Off Unit
CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU
_______
DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE
DAMAGE TO EQUIPMENT.
(1) Disconnect the plug (3) from the connector A and the plug (4) from
the connector B.
(2) Install blanking caps on the plugs (3) and (4) and the connectors A
and B.
(3) Hold the APPU (5), remove the bolts (6) and the washers (7), then
disengage and remove the APPU (5).
(4) Remove the screw (1) the washer (2) and disconnect the bonding strap
(13).
(5) Install a tie-wrap (8) behind the locking plate (11) to lock the APPU
(5) in position.



EFF :
ALL
 27-81-18



AIJ




Page 403
Feb 01/07

R
R

Asymmetry-Position Pick-Off Unit 31CV (32CV)


Figure 401/TASK 27-81-18-991-001



EFF :
ALL
 27-81-18



AIJ




Page 404
Feb 01/07

TASK 27-81-18-400-001
Installation of the Asymmetry-Position Pick-Off Unit 31CV (32CV)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-81-18



AIJ




Page 405
Feb 01/07

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004

27-84-00-710-001
27-81-18-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Operational Test of the Slat System
Fig. 401

3. __________
Job Set-up
Subtask 27-81-18-941-056
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat system.
Subtask 27-81-18-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully retracted, if the APPU is a
replacement.
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever.
(3) Make sure that the applicable access panel is removed:
- for the left wing, panel 522UB
- for the right wing, panel 622UB.



EFF :
ALL
 27-81-18



AIJ




Page 406
Feb 01/07

Subtask 27-81-18-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-81-18-991-001)


Subtask 27-81-18-420-051
A. Preparation for Installation
(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean:
- the interface of the APPU (5)
- the adaptor plate (12)
- the bolts (6)
- the washers (7).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.
(4) Examine the APPU (5) and the interface of the adaptor plate (12) for
damage, cracks and corrosion.
(5) If you install a new APPU (5) make sure that:
- the zero marks in the viewing window align with their applicable
fixed pointers (Detail D)
- the zero marks on the drive shaft (10) and the APPU (5) align with
each other (Detail C).



EFF :
ALL
 27-81-18



AIJ




Page 407
Feb 01/07

Subtask 27-81-18-420-052
B. Installation of the Assymetry-Postion Pick-Off Unit (APPU)
CAUTION : MAKE SURE THAT THE SYSTEM IS IN ITS ZERO DEGREE POSITION BEFORE
_______
YOU INSTALL THE APPU.
A NEW APPU IS SUPPLIED LOCKED IN THE MECHANICAL AND ELECTRICAL
ZERO POSITION.
(1) Remove the tie-wrap (8) from behind the locking plate (11).
(2) Install the bonding strap (13) with the washer (2) and the screw (1)
(Ref. TASK 20-28-00-912-004).
(3) Install the APPU:
CAUTION : DO NOT USE THE INSTALLATION BOLTS TO ENGAGE THE APPU DRIVE
_______
IN THE COUPLING. IF YOU DO, THIS WILL CAUSE:
- THE COUPLING TO DISCONNECT
- DAMAGE TO THE SPLINES
- DAMAGE TO THE APPU.
(a) Position the APPU (5) on the adaptor plate (12). Make sure that
the housing keyway and the key in the adaptor plate (12) align
correctly.
(b) Engage the APPU drive shaft (10) in the splines of the bellows
coupling (9).
(c) Use hand pressure and carefully push the APPU (5) fully into the
adaptor plate (12). Hold the APPU (5) in this position and
install the washers (7) and the bolts (6).
(d) TORQUE the bolts (6) to between 0.78 and 0.96 m.daN (69.02 and
84.95 lbf.in).
(4) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (6) and the washers (7).
(5) Remove the blanking caps from the plugs (3) and (4) and the
connectors A and B.



EFF :
ALL
 27-81-18


R 
AIJ




Page 408
Feb 01/07

(6) Electrically connect the APPU:


CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU
_______
CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO
EQUIPMENT.
(a) Connect the plug (3) to the connector A and the plug (4) to the
connector B.
(7) Make sure that the slat movement area is clear of tools, materials
and equipment.
(8) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control-lever.
Subtask 27-81-18-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV.
Subtask 27-81-18-710-050
D. Operational Test
(1) Do an operational test of the slat system (Ref. TASK 27-84-00-710001).
5. Close-up
________
Subtask 27-81-18-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the safety collar on circuit breakers 9CV and 11CV.
(3) Install the applicable access panel:
- FOR 31CV
install 522UB
- FOR 32CV
install 622UB.



EFF :
ALL
 27-81-18


R 
AIJ




Page 409
Feb 01/07

Subtask 27-81-18-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-18


R 
AIJ




Page 410
Feb 01/07

POSITION PICK - OFF UNIT - FEED BACK (FPPU) (28CV) - REMOVAL/INSTALLATION


_________________________________________________________________________
TASK 27-81-19-000-001
Removal of the Feed Back Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

blanking caps
circuit breaker(s) safety clip(s)
tie-wrap
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
32-12-00-010-001
27-81-19-991-001

Retracting the Slats on the Ground


Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-81-19-010-050
A. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-81-19



AIJ




Page 401
Feb 01/11

Subtask 27-81-19-860-050
B. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the slats are in the fully retracted position
(Ref. TASK 27-80-00-866-005).
Subtask 27-81-19-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-81-19-991-001)
Subtask 27-81-19-020-050
A. Removal of the Feed Back Position Pick-Off Unit
NOTE : Do not remove the Feed Back Position Pick-off Unit when the
____
Pressure-off Brakes are removed from the Power Control Unit.
(1) Remove the electrical connectors 28CV-A and 28CV-B from the Feed Back
Position Pick-off Unit (FPPU).
(2) Put blanking caps on the disconnected electrical connector(s).
(3) Remove the screws (1) and the washers (2).
(4) Remove the FPPU carefully from the gearbox.
(5) Put a tie-wrap (3) behind the locking plate to prevent the retraction
of the locking plate.



EFF :
ALL
 27-81-19



AIJ




Page 402
Feb 01/11

R
R

Feed Back Position Pick-Off Unit


Figure 401/TASK 27-81-19-991-001



EFF :
ALL
 27-81-19



AIJ




Page 403
Feb 01/07

TASK 27-81-19-400-001
Installation of the Feed Back Position Pick-Off Unit
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-002

USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


ZINC POWDER (Ref. 20-31-00)



EFF :
ALL
 27-81-19



AIJ




Page 404
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-84-00-710-001
32-12-00-010-001
32-12-00-410-001
27-81-19-991-001

Retracting the Slats on the Ground


Operational Test of the Slat System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401

3. __________
Job Set-up
Subtask 27-81-19-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK
32-12-00-010-001).
R

(2) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(3) Make sure that the slats are in the retracted position (Ref. TASK 2780-00-866-005) because a new FPPU is delivered locked in its zero
position.
Subtask 27-81-19-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-81-19



AIJ




Page 405
Feb 01/11

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-81-19-991-001)


Subtask 27-81-19-860-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Remove the sealing compound from the flange of the replacement FPPU.
(4) Clean the anodic contact areas on the FPPU and the gearbox.
(5) Coat the areas with a mixture of SPECIAL MATERIALS (Material No. 05002) and SPECIAL MATERIALS (Material No. 05-054) in the ratio of 58
to 42 by weight.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) the threads of the
screws (1).
Subtask 27-81-19-420-050
B. Installation of the Feed Back Position Pick-Off Unit
(1) Make sure that all zero marks on the FPPU are aligned.
(2) Remove the tie-wrap (3).
(3) Install the FPPU carefully on the gearbox.
(4) Install the screws (1) and the washers (2).
(5) TORQUE the screws (1) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).



EFF :
ALL
 27-81-19



AIJ




Page 406
Feb 01/07

(6) Do a bonding test between the main bonding point of the power control
unit and the FPPU flange. The resistance must not be more than 20
milliohms.
(7) Remove the blanking caps from the electrical connectors.
(8) Make sure that the electrical connectors are clean and in the correct
condition.
(9) Connect the electrical connectors 28CV-A and 28CV-B to the FPPU.
Subtask 27-81-19-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV
Subtask 27-81-19-710-050
D. Do the operational test of the slat system (Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-81-19-410-050
A. Close Access
(1) Remove the access platform(s).
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-81-19


R 
AIJ




Page 407
Feb 01/07

ADAPTOR PLATE - PPU (6048CM,6098CM) - REMOVAL/INSTALLATION


__________________________________________________________
TASK 27-81-42-000-001
Removal of the PPU Adaptor Plate 6048CM(6098CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 4 m (13 ft. 1 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-81-18-000-001
R

27-81-42-991-001-A

Retracting the Slats on the Ground


Removal of the Asymmetry-Position Pick-Off Unit 31CV
(32CV)
Fig. 401



EFF :
ALL
 27-81-42



AIJ




Page 401
May 01/09

3. __________
Job Set-up
Subtask 27-81-42-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in position to tell persons not to operate the
flap/slat controls.
Subtask 27-81-42-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on the panel 114VU.
(3) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-81-42-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-81-42-010-050
D. Get Access
(1) Put the access platform in position:
- FOR 6048CM
below zone 510
- FOR 6098CM
below zone 610.



EFF :
ALL
 27-81-42


R 
AIJ




Page 402
Feb 01/07

(2) Remove the access panels:


- FOR 6048CM
remove 522UB
- FOR 6098CM
remove 622UB.
4. Procedure
_________
R
R

(Ref. Fig. 401/TASK 27-81-42-991-001-A)


Subtask 27-81-42-020-051-A

A. Removal of the PPU Adaptor Plate

R
R

(1) Remove the Asymmetry-Position Pick-off Unit (APPU) (Ref. TASK 27-8118-000-001).

(2) Remove the retaining ring (5) and the pin (3).

(3) Remove the nuts (2) from the bolts (6).

(4) Hold the slat torque-shaft and remove the PPU adaptor plate (1).

(5) Remove the bolts (6) and the locking ring (4).



EFF :
ALL
 27-81-42



AIJ




Page 403
May 01/09

R
R

Position Pick-Off Unit Adaptor-Plate 6048CM(6098CM)


Figure 401/TASK 27-81-42-991-001-A



EFF :
ALL
 27-81-42



AIJ




Page 404
May 01/09

TASK 27-81-42-400-001
Installation of the PPU Adaptor Plate 6048CM(6098CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
access platform 4 m (13 ft. 1 in.)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-022
Material No. 05-002C
Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007

USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
GB DTD-5604
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)



EFF :
ALL
 27-81-42



AIJ




Page 405
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-003

USA AMS 3819


LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-81-18-400-001
27-81-42-991-001-A

Retracting the Slats on the Ground


Installation of the Asymmetry-Position Pick-Off Unit
31CV (32CV)
Fig. 401

3. __________
Job Set-up
Subtask 27-81-42-941-056
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in positon to tell persons not
to operate the flap/slat controls.
Subtask 27-81-42-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on the panel 114VU.
(3) Make sure that the access platform is in position:
(a) FOR 6048CM
below zone 510
(b) FOR 6098CM
below zone 610.



EFF :
ALL
 27-81-42


R 
AIJ




Page 406
Aug 01/11

(4) Make sure that the applicable access panel is removed:


(a) FOR 6048CM
remove 522UB
(b) FOR 6098CM
remove 622UB.
Subtask 27-81-42-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 401/TASK 27-81-42-991-001-A)
Subtask 27-81-42-420-051
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS


(Material No. 11-026) to clean the interface of the structure and the
PPU adaptor plate (1).
(2) Examine the interface of the structure and the PPU adaptor plate (1)
for damage, cracks and corrosion.



EFF :
ALL
 27-81-42



AIJ




Page 407
Aug 01/11

(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do an inspection of the component interface and/or the adjacent area.
Subtask 27-81-42-420-052-A
B. Installation of the PPU Adaptor Plate
(1) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09019) to the interface of the structure and the PPU adaptor plate (1).
(2) Apply a layer of SPECIAL MATERIALS (Material No. 05-002C) to the
interface of the structure and the locking ring (4).
(3) Apply COMMON GREASE (Material No. 04-022) to the splines on the slat
torque-shaft.
(4) Put the PPU adaptor plate (1) and the locking ring (4) in the correct
position on the structure and the torque shaft.
(5) Install the bolts (6) and the nuts (2).
(6) Install the pin (3) and safety it with the retaining ring (5).
(7) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
nuts (2) and the heads of the bolts (6).
(8) Install the Asymmetry-Position Pick-off Unit (APPU) (Ref. TASK 27-8118-400-001).
5. Close-up
________
Subtask 27-81-42-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
(a) FOR 6048CM
install 522UB
(b) FOR 6098CM
install 622UB.



EFF :
ALL
 27-81-42


R 
AIJ




Page 408
Aug 01/11

Subtask 27-81-42-942-051
B. Removal of Equipment
(1) Remove the warning notice(s).
(2) Remove the access platform(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-42


R 
AIJ




Page 409
Feb 01/07

BRAKE - WING TIP (WTB) (35CV,36CV) - REMOVAL/INSTALLATION


_________________________________________________________
TASK 27-81-51-000-001
Removal of the Slat Wing-Tip Brake
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27504030001

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
safety barriers
warning notice(s)
access platform 4 m (13 ft. 1 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)



EFF :
ALL
 27-81-51



AIJ




Page 401
Aug 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-45-000-006

29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
27-81-51-991-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-81-51-991-001)


Subtask 27-81-51-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Put the warning notice(s) in position to tell persons not to
pressurize the hydraulic systems.
Subtask 27-81-51-010-050
B. Get Access
(1) Put the access platform in position below the applicable zone
522(622).
(2) Remove the applicable access panels:
- FOR 35CV
remove 522QB, 522SB, 522UB
- FOR 36CV



EFF :
ALL
 27-81-51



AIJ




Page 402
Feb 01/07

R
R

Slat Wing-Tip Brake


Figure 401/TASK 27-81-51-991-001



EFF :
ALL
 27-81-51



AIJ




Page 403
Feb 01/07

remove 622QB, 622SB, 622UB.


Subtask 27-81-51-860-052
C. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is installed.
R

(3) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on the


inboard and the outboard torque shafts (Ref. TASK 27-50-00-400-003).
(4) Make sure that the Blue and the Green hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-003) and (Ref. TASK 29-10-00864-001).
(5) Depressurize the Blue and the Green hydraulic reservoirs (Ref. TASK
29-14-00-614-001).
(6) Remove the safety collar from the CB 9CV and the CB 11CV.
Subtask 27-81-51-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-81-51



AIJ




Page 404
Aug 01/08

4. Procedure
_________
(Ref. Fig. 401/TASK 27-81-51-991-001)
Subtask 27-81-51-020-052
A. Removal of the Slat Wing-Tip Brake
(1) Disconnect the electrical connectors (7) and (10).
R

(2) Put blanking caps on the disconnected electrical connector(s).


(3) Disconnect the hydraulic lines (13), (16), (21) and (26).
(4) Put blanking plugs on the disconnected line ends.
(5) Remove the nut (6), the washer (5), the bolt (4) and the bonding
strap (2) from the T-piece (3).
(6) At the inboard side of the wing-tip brake (1), remove the nuts (19)
and the bolts (20).
CAUTION : DO NOT MOVE THE TORQUE SHAFT TOO FAR SIDEWAYS. IT WILL
_______
CAUSE DAMAGE TO THE UNIVERSAL JOINT.
(a) Move the flanges of the torque shaft apart and remove the
universal joint from the wing-tip brake (1). If the flanges will
not move apart suffiently, remove the middle part of the torque
shaft (Ref. TASK 27-84-45-000-006).
1
_

For the LH wing:


- FIN 6042CM (inboard of the wing-tip brake)
- FIN 6044CM (outboard of the wing-tip brake).

2
_

For the RH wing:


- FIN 6092CM (inboard of the wing-tip brake)
- FIN 6094CM (outboard of the wing-tip brake).

(7) Hold the wing-tip brake (1) and remove the nuts (17).
(8) Remove the wing-tip brake (1).
(9) If you are to install a new wing-tip brake (1):
(a) Retain the following items:
- the adapters (12), (15), (22) and (27).
- the T-piece (3) and its attachment bolts.
(b) Discard the related O-rings (11), (14), (23) and (28).



EFF :
ALL
 27-81-51



AIJ




Page 405
Aug 01/11

INTENTIONALLY BLANK



R

 27-81-51



AIJ




Page 406
Aug 01/11

TASK 27-81-51-400-001
Installation of the Slat Wing-Tip Brake
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
CAUTION : DO NOT LET THE MLG DOOR TOUCH THE BOTTOM WING SURFACE. THIS WILL
_______
PREVENT DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific

safety barriers
warning notice(s)
access platform 4.0 m (13 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

Material No. 04-018


Material No. 04-022
Material No. 05-020
Material No. 09-001
R

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-L-60326
TYPE I
FLUOROCARBON RELEASE AGENT (Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)



EFF :
ALL
 27-81-51



AIJ




Page 407
Aug 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
R
Material No. 09-019
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------11
14
23
28

O-ring
O-ring
O-ring
O-ring

29-12-05
27-84-05
27-84-05
29-11-05

24
58
58
05

-060
-070
-070
-060

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
20-28-00-912-004
27-50-00-000-003
27-50-00-400-003

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)



EFF :
ALL
 27-81-51



AIJ




Page 408
Nov 01/08

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-81-00-710-001
27-84-45-400-007

29-10-00-863-001
29-10-00-863-003

29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
27-81-51-991-001

Retracting the Slats on the Ground


Operational Test of the Wing-Tip Brake and the
Pressure-Off Brake
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)
/6044CM(6094CM)
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-81-51-991-001)


Subtask 27-81-51-941-061
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) is/are in the cockpit to tell
persons not to operate the slat controls.
(3) Make sure that the warning notice(s) are in position to tell persons
not to pressurize the hydraulic systems.
Subtask 27-81-51-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable access
panel.
(2) Make sure that the applicable access panels have been removed:
- FOR 35CV
panels 522QB, 522SB, 522UB
- FOR 36CV
panels 622QB, 622SB, 622UB.



EFF :
ALL
 27-81-51



AIJ




Page 409
Feb 01/07

(3) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed.
(5) Make sure that the Blue and Green hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-003) and (Ref. TASK 29-10-00-864-001).
(6) Make sure that the Blue and Green hydraulic reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
R

(7) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed on
the inboard and outboard torque shafts (Ref. TASK 27-50-00-400-003).
Subtask 27-81-51-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 401/TASK 27-81-51-991-001)
Subtask 27-81-51-420-054
A. Preparation for Installation
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-81-51



AIJ




Page 410
Aug 01/08

(4) If you install a new WTB:


- lubricate the new O-rings (11), (14), (23) and (28) with HYDRAULIC
FLUIDS (Material No. 02-003).
(5) Install the adaptors (12), (15), (22) and (27) as follows:
(a) Remove the blanking plugs at the positions (24) and (25). Discard
the related O-rings.
(b) Make sure that the blanking plugs (8) and (9) are safetied.
(c) Install the new O-rings as follows:
-

O-ring
O-ring
O-ring
O-ring

(11)
(14)
(23)
(28)

on
on
on
on

the
the
the
the

adaptor
adaptor
adaptor
adaptor

(12)
(15)
(22)
(27).

(d) Install the adaptors (12), (15), (22) and (27) at their related
position on the wing-tip brake (1).
(e) Install the T-piece (3) on the wing-tip brake (1).
(6) Use CLEANING AGENTS (Material No. 11-026) and a clean MISCELLANEOUS
(Material No. 19-003) to clean the internal splines of the wing-tip
brake.
(7) Do one of the steps that follow:
CAUTION : DO NOT APPLY MORE THAN ONE TYPE OF LUBRICANT.
_______
GREASE AND ASSEMBLY PASTE DO NOT MIX.
(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to:
- the spline surfaces
- the splines of the universal joints.
- or
(b) Apply a thin layer of COMMON GREASE (Material No. 04-018) to:
- the spline surfaces
- the splines of the universal joints.
(8) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the mating face of the wing-tip brake (1).
(9) Apply SPECIAL MATERIALS (Material No. 05-020) to the mating face of
the structure (for easy removal of the wing-tip brake (1)).



EFF :
ALL
 27-81-51



AIJ




Page 411
Feb 01/07

Subtask 27-81-51-420-053
B. Installation of the Slat Wing-Tip Brake
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Hold the wing-tip brake (1) near to its installed position. Attach
the bonding strap (2) with the bolt (4), the washer (5) and the nut
(6) to the bonding point (3) (Ref. TASK 20-28-00-912-004).
(2) Put the wing-tip brake (1) in position on the inboard face of the
rib. Make sure that the locating stud is engaged.
(3) Hold the wing-tip brake (1) and install the nuts (17).
(4) TORQUE the nuts (17) to between 0.5 and 0.55 m.daN (44.24 and 48.67
lbf.in).
(5) Apply SEALANTS (Material No. 09-001) to the nuts (17) and the
locating stud.
(6) Install the universal joint (18) in the wing-tip brake so that the
bolt holes in the flanges are aligned.
(7) Install the bolts (20) and the nuts (19).
(8) TORQUE the nuts (19) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(9) If you removed the middle part of the torque shaft, install it
(Ref. TASK 27-84-45-400-007):
(a) For the LH wing:
- 6042CM (inboard of the wing-tip brake)
- 6044CM (outboard of the wing-tip brake).
(b) For the RH wing:
- 6092CM (inboard of the wing-tip brake)
- 6094CM (outboard of the wing-tip brake).



EFF :
ALL
 27-81-51


R 
AIJ




Page 412
Feb 01/07

(10) Make sure that you cannot see the groove on the splines of the
universal joints.
(11) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to:
- the nuts (19), the bolts (20) and the studs on the the wing-tip
brake (1)
- the flanges of the universal joint (18) and the torque shaft.
(12) Remove the blanking plugs from the hydraulic lines.
(13) Make sure that the ends of the hydraulic lines are clean and in the
correct condition.
(14) Lubricate the coupling nuts on the hydraulic lines (13), (16), (21)
and (26) with HYDRAULIC FLUIDS (Material No. 02-003).
(15) Connect the hydraulic lines (13), (16), (21) and (26) to the wing-tip
brake (1) and tighten the coupling nuts.
(16) Remove the blanking caps from the electrical connectors (7) and (10).
(17) Make sure that the electrical connectors (7) and (10) are clean and
in the correct condition.
(18) Connect the electrical connectors (7) and (10) to the wing-tip brake
(1).
(19) Connect the bonding strap (2) to the T-piece (3) with the bolt (4),
the washer (5) and the nut (6) (Ref. TASK 20-28-00-912-004).
Subtask 27-81-51-860-054
C. Aircraft Maintenance Configuration
(1) Fill the Blue and the Green Hydraulic reservoirs (Ref. TASK 12-12-29611-001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever.
R

(3) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from each torque shaft
(Ref. TASK 27-50-00-000-003).



EFF :
ALL
 27-81-51



AIJ




Page 413
Aug 01/08

Subtask 27-81-51-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
9CV, 11CV.
Subtask 27-81-51-480-050
E. Installation of Support Equipment
(1) Install the safety collar on the circuit breakers 9CV and 11CV.
Subtask 27-81-51-863-050
F. Pressurize the Hydraulic System
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
(1) Pressurize the Blue and the Green Hydraulic systems (Ref. TASK 29-1000-863-003) and (Ref. TASK 29-10-00-863-001).
NOTE : The hydraulic supplies to the wing-tip brake are bled
____
automatically.
Subtask 27-81-51-790-050
G. Test
CAUTION : MAKE SURE THE POWER TRANSMISSION SYSTEM IS COMPLETE BEFORE YOU
_______
DO A PREPARATION FOR TEST OR A TEST.
(1) Examine the wing-tip brake and the related hydraulic connections for
leaks.
(2) Do an operational test of the slats wing-tip brake (Ref. TASK 27-8100-710-001).



EFF :
ALL
 27-81-51


R 
AIJ




Page 414
Feb 01/07

(3) Do a leak check on the slats wing-tip brake:


- examine the four witness drain holes in the wing-tip brake for
leaks.
NOTE : This area is not pressurized during normal operation, so leaks
____
will only show after the operational test.
5. Close-up
________
Subtask 27-81-51-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels:
- FOR 35CV
install 522QB, 522SB, 522UB
- FOR 36CV
install 622QB, 622SB, 622UB.
Subtask 27-81-51-942-050
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-51


R 
AIJ




Page 415
Feb 01/07

TASK 27-81-51-000-004
Removal of the Solenoid Valve from the Slat Wing-Tip Brake (WTB)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

blanking plugs
circuit breaker(s) safety clip(s)
safety barriers
warning notice
access platform 4 m (13 ft. 1 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-80-00-866-005
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
27-81-51-991-002

Retracting the Slats on the Ground


Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 402



EFF :
ALL
 27-81-51



AIJ




Page 416
Feb 01/07

3. __________
Job Set-up
R

(Ref. Fig. 402/TASK 27-81-51-991-002)


Subtask 27-81-51-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
(3) Put a warning notice in position to tell persons not to pressurize
the hydraulic systems.
Subtask 27-81-51-010-052
B. Get Access
(1) Put the access platform below the applicable zone 522(622).
(2) Remove the applicable access panel:
- for the solenoid valve (7) on 35CV remove 522SB
- for the solenoid valve (7) on 36CV remove 622SB.
Subtask 27-81-51-860-053
C. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
(3) Make sure that the Blue and the Green hydraulic systems are
depressurized (Ref. TASK 29-10-00-864-003) and (Ref. TASK 29-10-00864-001).
(4) Depressurize the Blue and the Green hydraulic reservoirs (Ref. TASK
29-14-00-614-001).
(5) Remove the safety collar from the CB 9CV and the CB 11CV.



EFF :
ALL
 27-81-51



AIJ




Page 417
Feb 01/07

R
R

Solenoid Valve - Slat WTB


Figure 402/TASK 27-81-51-991-002



EFF :
ALL
 27-81-51



AIJ




Page 418
Feb 01/07

Subtask 27-81-51-865-053
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-81-51-991-002)


Subtask 27-81-51-020-051
A. Removal of the Solenoid Valve from the Slat Wing-Tip Brake (WTB)
(1) Remove the screws (9).
(2) Use one of the screws (9) in the hole (8) to help you to remove the
solenoid valve (7).
(3) Remove the screw (9) from the hole (8).
(4) Remove and discard the O-rings (1), (3), (5) and (6), and the back-up
rings (2) and (4), from the solenoid valve (7).
(5) Put blanking plugs on the disconnected line ends.



EFF :
ALL
 27-81-51



AIJ




Page 419
Feb 01/07

TASK 27-81-51-400-002
Installation of the Solenoid Valve to the Slat Wing-Tip Brake (WTB)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

safety barriers
warning notice
access platform 4.0 m (13 ft. 1 in.)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-81-51



AIJ




Page 420
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R
R
R

1
1
2
3
3
4
5
5
6
6

O-ring
O-ring
back-up ring
O-ring
O-ring
back-up ring
O-ring
O-ring
O-ring
O-ring

27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51
27-51-51

01
01
01
01
01
01
01
01
01
01

-090
-090A
-070
-080
-080A
-060
-040
-040A
-050
-050A

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-80-00-866-005
27-81-00-710-001
29-10-00-863-001
29-10-00-863-003
29-10-00-864-001
29-10-00-864-003
29-14-00-614-001
27-81-51-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Retracting the Slats on the Ground
Operational Test of the Wing-Tip Brake and the
Pressure-Off Brake
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System
Depressurize the Blue Hydraulic System
Depressurization of the Hydraulic Reservoirs
Fig. 402

3. __________
Job Set-up
Subtask 27-81-51-941-062
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.



EFF :
ALL
 27-81-51



AIJ




Page 421
Aug 01/07

(3) Make sure that the warning notice is in position to tell persons not
to pressurize the hydraulic systems.
Subtask 27-81-51-860-057
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable zone
522(622).
(2) Make sure that the applicable access panel has been removed:
- for the solenoid valve (7) on 35CV, remove 522SB
- for the solenoid valve (7) on 36CV, remove 622SB.
(3) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever on panel 114VU.
(5) Make sure that the Blue and Green hydraulic systems are depressurized
(Ref. TASK 29-10-00-864-003) and (Ref. TASK 29-10-00-864-001).
(6) Make sure that the Blue and the Green hydraulic reservoirs are
depressurized (Ref. TASK 29-14-00-614-001).
Subtask 27-81-51-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-81-51


R 
AIJ




Page 422
Aug 01/07

4. Procedure
_________
(Ref. Fig. 402/TASK 27-81-51-991-002)
Subtask 27-81-51-420-055
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area with a clean
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).

R
R

(2) Do an inspection of the component interface and/or the adjacent area.


(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Lubricate the new O-rings (1), (3), (5) and (6), and the back-up
rings (2) and (4), with HYDRAULIC FLUIDS (Material No. 02-003).
(5) Remove the blanking plugs from the solenoid valve (7) and the
interface of the wing tip brake.
(6) Apply a thin layer of STORAGE PRESERVATION (Material No. 15-007) at
the interface of the solenoid valve (7) and the manifold.
(7) Apply STORAGE PRESERVATION (Material No. 15-007) to all of the bolts
and nuts.



EFF :
ALL
 27-81-51



AIJ




Page 423
Aug 01/11

Subtask 27-81-51-420-051
B. Installation of the Solenoid Valve to the Slat Wing-Tip Brake (WTB)
(1) Install the new O-ring (5) and the new O-ring (6) on the solenoid
valve (7).
(2) Install the new back-up ring (4) and the new O-ring (3) on the
solenoid valve (7). Make sure that the curve on the face of the
back-up ring (4) is against the O-ring (3).
(3) Install the new back-up ring (2) and the new O-ring (1) on the
solenoid valve (7). Make sure that the curve on the face of the
back-up ring (2) is against the O-ring (1).
(4) Install the solenoid valve (7) on the wing tip brake.
NOTE : Solenoid valves 903A0000-01 removed from the PCU valve block
____
(Ref. 27-54-53 and 27-84-53) must not be installed on the
wing-tip brake.
(5) Install the screws (9).
(6) TORQUE the screws (9) to between 0.25 and 0.27 m.daN (22.12 and 23.89
lbf.in).
Subtask 27-81-51-860-056
C. Aircraft Maintenance Configuration
(1) Fill the Blue and the Green hydraulic reservoirs (Ref. TASK 12-12-29611-001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
control lever on panel 114VU.
Subtask 27-81-51-865-055
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
9CV, 11CV.
Subtask 27-81-51-420-056
E. Install the Safety Collar
(1) Install the safety collar on the circuit breakers 9CV and 11CV.



EFF :
ALL
 27-81-51


R 
AIJ




Page 424
Feb 01/07

Subtask 27-81-51-863-051
F. Pressurize the Hydraulic Systems
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______
ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE
_______
ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
(1) Pressurize the Blue and the Green hydraulic systems (Ref. TASK 29-1000-863-003) and (Ref. TASK 29-10-00-863-001).
Subtask 27-81-51-790-052
G. Test
(1) Examine the solenoid valve (7) and the interface of the solenoid
valve (7) and the wing tip brake, for leaks.
(2) Do an operational test of the slats wing-tip brake (Ref. TASK 27-8100-710-001).
(3) Do the leak check again.
5. Close-up
________
R

(Ref. Fig. 402/TASK 27-81-51-991-002)


Subtask 27-81-51-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- for the solenoid valve (7) on 35CV install 522SB
- for the solenoid valve (7) on 36CV install 622SB.



EFF :
ALL
 27-81-51



AIJ




Page 425
Feb 01/07

Subtask 27-81-51-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-81-51


R 
AIJ




Page 426
Feb 01/07

SLATS HYDRAULIC ACTUATION AND POWER TRANSMISSION - DESCRIPTION AND OPERATION


____________________________________________________________________________
1. General
_______
A hydromechanical Power Control Unit (PCU) in the aircraft fuselage supplies
mechanical power to the slat transmission system. The PCU has two hydraulic
motors. Each motor has a Pressure-Off Brake (POB) and a valve block, which
is electrically controlled.
Torque shafts and gearboxes in the fuselage and the wings transmit the
mechanical power from the slat PCU to the actuators, which move the slats.
There are two actuators for each slat. The actuators are installed on the
aircraft structure.
Torque limiters in the transmission system and in the actuators make sure
that the load applied to the structure is not too high.
Wing tip brakes give asymmetry and runaway protection (Ref. 27-81-00).
2. __________________
Component Location
(Ref. Fig. 001, 002)
------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------6001CM
POWER CONTROL UNIT
148 734
27-84-51
6002CM
TORQUE SHAFT ASSY-TRANSMISSION
191 191KB
27-84-45
6003CM
GEARBOX-BEVEL 19 DEG
191 191KB
27-84-41
6004CM
TORQUE SHAFT ASSY-TRANSMISSION
191 191BB
27-84-45
6005CM
GEARBOX-TEE
191 191BB
27-84-42
6006CM
TORQUE SHAFT ASSY-TRANSMISSION
191 191BB
27-84-45
6007CM
STEADY BEARING ASSY-TRANSMISSION
191 191LB
27-84-44
6008CM
TORQUE SHAFT ASSY-TRANSMISSION
191 191EB
27-50-00
6009CM
GEARBOX-BEVEL 63.5 DEG
191 191BT
27-84-43
6010CM
TORQUE SHAFT ASSY-TRANSMISSION
191 191BT
27-84-45
6011CM
GEARBOX-BEVEL 63.5 DEG
191 191BT
27-84-43
6012CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521AB
27-84-45
6013CM
ACTUATOR ASSY-TYPE A
521 521CB
27-84-48
6014CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521CB
27-50-00
6015CM
ACTUATOR ASSY-TYPE A
521 521EB
27-84-48
6016CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521EB
27-50-00
6017CM
STEADY BEARING ASSY-TRANSMISSION
521 521EB
27-84-44
6018CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521EB
27-50-00
6019CM
STEADY BEARING ASSY-TRANSMISSION
521 521EB
27-84-44
6020CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521EB
27-50-00



EFF :
ALL
 27-84-00



AIJ




Page 1
Feb 01/07

Slat System - Component Location


Figure 001 (SHEET 1)


EFF :
ALL
 27-84-00



AIJ




Page 2
Feb 01/07

Slat System - Component Location


Figure 001 (SHEET 2)


EFF :
ALL
 27-84-00



AIJ




Page 3
Feb 01/07

Steady Bearings and Torque Shafts - Component Location


Figure 002 (SHEET 1)


EFF :
ALL
 27-84-00



AIJ




Page 4
Feb 01/07

Steady Bearings and Torque Shafts - Component Location


Figure 002 (SHEET 2)


EFF :
ALL
 27-84-00



AIJ




Page 5
Feb 01/07

------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------6021CM
STEADY BEARING ASSY-TRANSMISSION
521 521EB
27-84-44
6022CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521AT
27-50-00
6023CM
STEADY BEARING ASSY-TRANSMISSION
521 522AB
27-84-44
6024CM
TORQUE SHAFT ASSY-TRANSMISSION
521 521AT
27-50-00
6025CM
STEADY BEARING ASSY-TRANSMISSION
522 522AB
27-84-44
6026CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522AB
27-50-00
6027CM
ACTUATOR ASSY-TYPE B
522 522AB
27-84-49
6028CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522AB
27-50-00
6029CM
ACTUATOR ASSY-TYPE B
522 522CB
27-84-49
6030CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522CB
27-50-00
6031CM
STEADY BEARING ASSY-TRANSMISSION
522 522CB
27-84-44
6032CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522EB
27-50-00
6033CM
ACTUATOR ASSY-TYPE B
522 522FB
27-84-49
6034CM
TORQUE SHAFT ASSY-TRANSMISSION
522 521HB
27-50-00
6035CM
ACTUATOR ASSY-TYPE B
522 522KB
27-84-49
6036CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522LB
27-50-00
6037CM
ACTUATOR ASSY-TYPE B
522 522NB
27-84-49
6038CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522NB
27-50-00
6039CM
ACTUATOR ASSY-TYPE B
522 522QB
27-84-49
6040CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522QB
27-50-00
6041CM
ACTUATOR ASSY-TYPE B
522 522SB
27-84-49
6042CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522SB
27-50-00
6044CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522UB
27-50-00
6045CM
ACTUATOR ASSY-TYPE B
522 522UB
27-84-49
6046CM
TORQUE SHAFT ASSY-TRANSMISSION
522 522UB
27-84-45
6056CM
TORQUE SHAFT ASSY-TRANSMISSION
192 191EB
27-84-45
6057CM
STEADY BEARING ASSY-TRANSMISSION
192 192LB
27-84-44
6058CM
TORQUE SHAFT ASSY-TRANSMISSION
192 192EB
27-50-00
6059CM
GEARBOX-BEVEL 63.5 DEG
192 192BT
27-84-43
6060CM
TORQUE SHAFT ASSY-TRANSMISSION
192 192BT
27-84-45
6061CM
GEARBOX-BEVEL 63.5 DEG
192 192BT
27-84-43
6062CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621AB
27-84-45
6063CM
ACTUATOR ASSY-TYPE A
621 621CB
27-84-48
6064CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621CB
27-50-00
6065CM
ACTUATOR ASSY-TYPE A
621 621EB
27-84-48
6066CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621EB
27-50-00
6067CM
STEADY BEARING ASSY-TRANSMISSION
621 621EB
27-84-44
6068CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621EB
27-50-00
6069CM
STEADY BEARING ASSY-TRANSMISSION
621 621EB
27-84-44
6070CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621EB
27-50-00
6071CM
STEADY BEARING ASSY-TRANSMISSION
621 621EB
27-84-44
6072CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621AT
27-50-00
6073CM
STEADY BEARING ASSY-TRANSMISSION
621 622AB
27-84-44



EFF :
ALL
 27-84-00



AIJ




Page 6
Feb 01/07

------------------------------------------------------------------------------FIN
|
FUNCTIONAL DESIGNATION
| PANEL|ZONE|ACCESS |
ATA
|
|
|
| DOOR |
REF.
------------------------------------------------------------------------------6074CM
TORQUE SHAFT ASSY-TRANSMISSION
621 621AT
27-50-00
6075CM
STEADY BEARING ASSY-TRANSMISSION
622 622AB
27-84-44
6076CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622AB
27-50-00
6077CM
ACTUATOR ASSY-TYPE B
622 622AB
27-84-49
6078CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622AB
27-50-00
6079CM
ACTUATOR ASSY-TYPE B
622 622CB
27-84-49
6080CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622CB
27-50-00
6081CM
STEADY BEARING ASSY-TRANSMISSION
622 622EB
27-84-44
6082CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622EB
27-50-00
6083CM
ACTUATOR ASSY-TYPE B
622 622FB
27-84-49
6084CM
TORQUE SHAFT ASSY-TRANSMISSION
622 621HB
27-50-00
6085CM
ACTUATOR ASSY-TYPE B
622 622KB
27-84-49
6086CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622LB
27-50-00
6087CM
ACTUATOR ASSY-TYPE B
622 622NB
27-84-49
6088CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622NB
27-50-00
6089CM
ACTUATOR ASSY-TYPE B
622 622QB
27-84-49
6090CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622QB
27-50-00
6091CM
ACTUATOR ASSY-TYPE B
622 622SB
27-84-49
6092CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622SB
27-50-00
6094CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622UB
27-50-00
6095CM
ACTUATOR ASSY-TYPE B
622 622UB
27-84-49
6096CM
TORQUE SHAFT ASSY-TRANSMISSION
622 622UB
27-84-45
3. __________________
System Description
(Ref. Fig. 003)
A. Hydraulic Actuation
Two of the three hydraulic systems supply fluid pressure through a
priority valve to the PCU:
- the BLUE hydraulic system supplies valve block 25CV
- the GREEN hydraulic system supplies valve block 26CV
- the priority valves are set when the pressure drops below 140 bar (2030
psi).
Each valve block controls the flow of hydraulic fluid to the related
hydraulic motor and its POB.
Each POB stops and holds the output shaft of the related hydraulic motor
when:
- the solenoids of the related valve block are de-energized because of a
normal PCU shutdown sequence



EFF :
ALL
 27-84-00


R 
AIJ




Page 7
Feb 01/07

PCU Hydraulic System - Schematic


Figure 003


EFF :
ALL
 27-84-00



AIJ




Page 8
Feb 01/07

- there is not enough pressure in the related hydraulic system


- one of the failures given in (Ref. 27-81-00) occurs.
A differential gearbox connects the output shafts of the hydraulic motors
and transmits their torque to the power transmission system. If a POB
engages and holds its motor, the remaining motor moves the transmission
system at half speed but at full torque.
B. Power Transmission
(Ref. Fig. 001, 004, 005)
The slat transmission system includes:
- torque shafts in the fuselage and wings
- a 19 degree bevel gearbox which changes the direction in which the
drive is aligned
- a T-gearbox which changes the direction in which the drive is aligned
through 90 degrees. This gives an output to each wing
- two 63.5 degree bevel gearboxes at each wing root. These gearboxes move
the drive from below wing level to the wing leading edge
- ten rotary actuators (two per slat) in each wing.
The torque shafts transmit power from the PCU to the gearboxes and
actuators. Universal joints connect the torque shafts and steady bearings
support them.
Each input gearbox has a torque limiter which operates in the two
directions (extend/retract). Each torque limiter has a lock-out torque
value set as necessary for its location. The torque limiters protect the
wing structure and the actuators from a torque overload which could occur
by a slat transmission failure. A mechanical indicator on each actuator
latches if a lock-out occurs. You can set the indicator again when the
aircraft is on the ground.
Attachment of the actuators is to housings. Bolts attach the housings to
the structure at tracks 2, 3 and 5 thru 12.
Each actuator moves its related track through a pinion. The actuator
output shaft moves the pinion which engages with a gear rack. Bolts
attach the gear rack to the track. The tracks operate in vertical-load
rollers and side-load rollers. The tracks retract through holes in the
front spar into sealed containers. The sealed containers make a
projection into the fuel tanks.
Tracks 1 and 4 are made almost the same as the moved tracks but without
the gear rack. They are to prevent that slat 1 falls away if there is a
slat attachment failure.



EFF :
ALL
 27-84-00


R 
AIJ




Page 9
Feb 01/07

Actuator - Typical Installation


Figure 004


EFF :
ALL
 27-84-00



AIJ




Page 10
Feb 01/07

Slat and Track Fairing-Operation


Figure 005


EFF :
ALL
 27-84-00



AIJ




Page 11
Feb 01/07

4. ____________
Power Supply
Not Applicable
5. Interface
_________
Not Applicable
6. _____________________
Component Description
R

(Ref. Fig. 006)

R
R

A. Power Control Unit (6001CM)

R
R
R
R
R
R
R
R
R
R
R
R
R
R

(1) Description
The slat PCU is a hydromechanical unit. The main body, which is a
case, contains a differential gearbox.
The Line Replaceable Units (LRUs) of the PCU are as follows:
- two hydraulic motors
- two Pressure-Off Brakes (POB)
- two valve blocks
- six solenoid valves
- two inlet filters
- one Feedback Position Pick-off Unit (FPPU)
- one Instrumentation Position Pick-off Unit (IPPU).

R
R
R
R
R
R
R
R
R
R
R
R
R

(a) Hydraulic Motor


(Ref. Fig. 007)
Each multi-piston hydraulic motor receives hydraulic pressure
from a valve block. The output shaft of the motor is connected to
a POB. Hydraulic fluid lubricates the motor. The cylinders of the
motor are connected to two ports, referred to as the extend and
retract ports.
When the valve block supplies hydraulic fluid to the extend port,
the motor moves in the direction necessary to extend the slats.
When hydraulic pressure is supplied to the retract port, the
motor moves in the opposite direction and the slats retract.



EFF :
ALL
 27-84-00



AIJ




Page 12
Nov 01/10

Power Control Unit


Figure 006



EFF :
ALL
 27-84-00



AIJ




Page 13
Nov 01/10

Hydraulic Motor
Figure 007



EFF :
ALL
 27-84-00



AIJ




Page 14
Nov 01/10

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

(b) Pressure-Off Brake (POB)

R
R
R
R

(c) Valve Block

(Ref. Fig. 008)


A POB is attached to each hydraulic motor. It holds the output
shaft of the hydraulic motor when:
- the hydraulic motors do not operate
- the related hydraulic system does not supply sufficient
hydraulic power
- the WTB stops the slat transmission system because of some
system failures.
The POB has a multiple friction-disk pack. Splines connect the
stators to the POB casing and the rotors to the shaft in the
center of the POB. Springs hold the friction disks together. When
hydraulic pressure is applied to the POB, the friction disks are
disengaged (against the pressure of the springs).
To remove the POB, you must remove the related hydraulic motor
first.

(Ref. Fig. 009)


The slat PCU has two valve blocks which are electrically
controlled. Each valve block controls the flow of hydraulic fluid
to its related hydraulic motor and POB.
The Linear Variable Differential Transducer (LVDT) is installed
on one end of the valve block. The LVDT monitors the position of
the control valve. Installed on the valve block opposite the LVDT
are two directional solenoid valves and one POB solenoid valve.
The directional solenoid valves operate as the extend or the
retract solenoid valves. The POB solenoid valve operates as the
brake solenoid valve.
The valve blocks are interchangeable with those fitted to the
flap PCU. Removal of the valve blocks is possible without removal
of the PCU from the aircraft.
The primary components of a valve block are:
- a main control valve
- an inlet filter
- five restrictors
- two check valves
- a pressure port
- a return port



EFF :
ALL
 27-84-00



AIJ




Page 15
Nov 01/10

Pressure-Off Brake
Figure 008



EFF :
ALL
 27-84-00



AIJ




Page 16
Nov 01/10

Valve Block
Figure 009



EFF :
ALL
 27-84-00



AIJ




Page 17
Nov 01/10

- an electrical connector.
R
R
R
R
R
R
R
R
R

(d) Solenoid Valve

R
R
R
R
R

(e) Filter

R
R
R
R
R
R
R
R
R
R
R
R
R

(f) Position Pick-Off Units

R
R
R
R
R
R
R
R
R
R
R

(g) Differential Gearbox

(Ref. Fig. 009)


The solenoid valves of the PCU are the same as and
interchangeable with each other and those on the Wing Tip Brake
(WTB). Their removal is possible without the removal of the valve
blocks from the PCU.

The inlet filter is installed at the pressure port. Its removal


is possible without the removal of the valve block from the PCU.

Two PPUs are installed in the slat PCU:


- the Instrumentation PPU (IPPU) (Ref. 27-85-00)
- the Feedback PPU (FPPU) (Ref. 27-81-00).
They are the same as the Asymmetry PPU (APPU) (Ref. 27-81-00)
installed in the transmission system at each wing tip. All PPUs
are interchangeable.
An intermediate gear transmits the movement from the differential
gearbox to the IPPU and the FPPU.
Removal of the PPUs is possible without the removal of the PCU
from the aircraft.

The differential gearbox contains a reduction and differential


gear. The reduction and differential gear transmits the movement
from the hydraulic motors through the PCU output bevel gear to
the flap transmission system. The casing of the differential
gearbox also contains the intermediate gear which transmits the
movement to the IPPU and the FPPU. On the differential gearbox
casing are primary and secondary load points for the attachment
of the PCU to the aircraft structure.



EFF :
ALL
 27-84-00



AIJ




Page 18
Nov 01/10

(2) Operation
The Slat/Flap Control Computers (SFCC1 and SFCC2) (Ref. 27-81-00)
control the PCU solenoid valves. The POB, extend and retract solenoid
valves, when energized, permit pressure fluid flow:
- to the POB
- to the chambers at each end of the control valve.
When the spool of the control valve moves away from the neutral
position, the hydraulic system of the aircraft is connected to the
related motor as follows:
- the direction of the valve spool movement controls the direction of
the motor rotation
- the quantity of the valve spool movement controls the speed at
which the motor turns.
During normal operation, the valve blocks and the motors operate at
the same time. They operate at the same time in the static, full
speed or low speed modes.
(a) Static Mode
R

(Ref. Fig. 010)


In the static mode:
- there is no electrical power at all three solenoid valves
- the centering effect of the springs holds the control valve in
the neutral position
- the lands on the valve spool seal the main pressure and return
lines
- the chambers at each end of the valve and the line to the POB
are open to return. The return is through the solenoid valves.
(b) Normal Startup Sequence

(Ref. Fig. 011)


During the normal startup sequence:
- the SFCC energizes one of the directional (extend or retract)
solenoid valves
- the applicable end of the control valve gets fluid pressure
- the valve spool moves in response to the increased fluid
pressure at its applicable end
- the LVDT sends a signal to the SFCC to indicate a movement of
the valve spool
- the movement of the valve spool causes the POB solenoid valve
to get fluid pressure



EFF :
ALL
 27-84-00



AIJ




Page 19
Nov 01/10

PCU Operation - Static Mode


Figure 010



EFF :
ALL
 27-84-00



AIJ




Page 20
Nov 01/10

PCU Operation - Normal Startup Sequence


Figure 011



EFF :
ALL
 27-84-00



AIJ




Page 21
Nov 01/10

- when the valve spool reaches the pressure on point, the SFCC
energizes the POB solenoid valve to release the POB
- the hydraulic motor receives fluid flow and starts to turn the
transmission
- with the valve spool fully moved, the motor gets the maximum
available fluid flow and turns at full speed.
(c) Normal Shutdown Sequence
R

(Ref. Fig. 012)


During the normal shutdown sequence:
- electrical power is removed from the drive-direction solenoid
when the flaps are 6.69 deg. (FPPU) away from the set position.
- the opposite direction solenoid is energized at this time.
- full hydraulic system pressure moves the spool towards the
center position. Restrictors control the speed of this movement
of the spool.
- the drive-direction solenoid is now energized again when the
spool gets to the Low Speed operation position. Spring
pressure now moves the spool, at a slower speed, towards the
center position. A restriction of hydraulic fluid into the
pressure-line upstream of the solenoid valve now controls the
speed of movement of the spool.
- the motor now operates at Low Speed because of the decreased
size of the pressure and pressure-return connections.
- electrical power is removed from the drive-direction solenoid
and the POB solenoid valve when the flaps are 0.177 deg. (FPPU)
away from the set position.
- when the LVDT indicates that the valve spool is 1.5 mm from the
center position the SFCC removes power from the opposite
direction solenoid valve.
- the valve spool moves to the center position and stops.
(d) Pressure Maintaining Function
Emergency or standby hydraulic power has a limited flow capacity.
At a time of operation with emergency or standby hydraulic power,
it is necessary to prevent a sudden decrease in supply pressure.
A sudden decrease in supply pressure can occur because of too
much demand by the flap system. This could cause an application
of the POB at any time.



EFF :
ALL
 27-84-00



AIJ




Page 22
Nov 01/10

PCU Operation - Normal Shutdown Sequence


Figure 012



EFF :
ALL
 27-84-00



AIJ




Page 23
Nov 01/10

The force and the rate of the spring, together with the port
area/valve movement property, give the function that maintains
the pressure of the valve. As the supply pressure decreases, the
valve closes slowly. This reduces the flowrate to the motor and
thus the workload on the pump. This prevents the workload of the
slat system to cause a sudden decrease of the supply pressure.
(e) Single System Operation
The loss of the hydraulic pressure to one of the two motors
causes the POB to apply and hold the motor output shaft. This
locks one half of the differential gearbox. The serviceable motor
then gives sufficient output torque at half speed, at the gearbox
output shaft.
B. Bevel Gearbox, 19 degree (6003CM)
R

(Ref. Fig. 013)


The bevel gearbox has a ratio of 1:1. The input and output shafts have
reversed lip seals which make sure that unwanted material does not get
into the gearbox. The gearbox is filled with grease. There are inspection
plugs through which you can examine the lubricant.
C. Tee Gearbox (6005CM)

(Ref. Fig. 014)


The T-gearbox has a ratio of 1:1. Bearings, seals and the procedures for
lubrication and inspection are almost the same as those used on the 19
degree bevel gearbox.
D. Bevel Gearbox, 63.5 degree (6009CM/6059CM, 6011CM/6061CM)

(Ref. Fig. 015)


The four 63.5 degree bevel gearboxes have a 1:1 ratio and are the same.
Bearings, seals and the procedure for lubrication and inspection are
almost the same as those used on the 19 degree bevel gearbox.



EFF :
ALL
 27-84-00



AIJ




Page 24
Nov 01/10

Bevel Gearbox, 19 degree


Figure 013



EFF :
ALL
 27-84-00



AIJ




Page 25
Nov 01/10

T-Gearbox
Figure 014



EFF :
ALL
 27-84-00



AIJ




Page 26
Nov 01/10

Bevel Gearbox, 63.5 degree


Figure 015



EFF :
ALL
 27-84-00



AIJ




Page 27
Nov 01/10

E. Torque Shafts and Steady Bearings


R

(Ref. Fig. 016)


The torque shafts are made of stainless steel. They have end fittings,
which are welded. The end fittings have a flange for a bolted joint or
splines for a sliding end connection. Bolts attach universal joints and
splined movable joints to the flanges where necessary. The universal
joints permit large angular changes of alignment and the splined movable
joints allow small angular changes of alignment.
Each shaft has at least one sliding end connection. The external part of
the sliding end connection has an indicator groove. It shows when the
engagement of the external and internal parts is below a minimum.
Steady bearings, which support the torque shafts, are attached to the
structure with bolts.
F. Actuator

(Ref. Fig. 017, 018)


There are two types of actuator in each wing. Those on tracks 2 and 3 are
larger in diameter and include more gearing than the other actuators. The
assembly and operation is almost the same for all actuators.
Each actuator includes:
- a cylindrical casing
- a through shaft
- a bidirectional torque limiter with latching indicator
- a sun gear
- a power output stage. (This includes a compound differential planetary
arrangement of six planets, supported by rings)
- an output shaft which engages the track drive pinion.
The large diameter actuator has a first-stage reduction gear between the
sun gear and the power output stage. The differential ratio across the
power output stage provides the high torque/low speed operation of the
actuators.
Grease fills the actuators for life-time lubrication. It is not possible
to lubricate at regular times. Collected moisture drains through bleed
holes in the casing. Pivoted cover plates over the bleed holes make sure
that unwanted material does not get into the actuator. The cover plates
turn to permit the removal of grease from the bleed holes. This helps the
collected moisture to drain.
The torque limiter has:



EFF :
ALL
 27-84-00



AIJ




Page 28
Nov 01/10

- a ball ramp device with input and output members


- a friction disc pack spline-mounted to release too much torque through
the gearbox casing into the aircraft structure
- a spring pack that is set to a limit of a minimum of 120% of the
maximum torque for operation
- an indicator which a spring clip usually keeps in the retracted
position.
The torque limiter stops the transmission of too much torque into the
output. It also makes sure that the indication of torque peaks, which
momentarily engage and release the torque limiter, does not occur.
(1) Operation
Power input to the actuator through-shaft moves the sun gear through
the torque limiter.
In the small diameter actuator, the sun gear transmits power directly
to the power output stage. The power is then transmitted to the
output shaft.
In the large diameter actuator, the sun gear moves the power output
stage through the first-stage reduction gear.
When the torque necessary at the actuator output shaft is more than
the load value of the torque limiter spring:
- the output member of the ball ramp moves slowly, which causes the
balls to move up the ramp
- the output member moves axially against spring A into the
clearance in the friction disc pack
- as input torque increases, brake friction in the friction disc pack
sends too much input torque through the gearbox casing into the
aircraft structure. This limits the output torque
- more increase in input torque causes more axial movement of the
output member against spring B
- as spring B compresses, the brake friction in the friction disc
pack makes sure that the input shaft does not turn
- the indicator extends to show that lock-out torque has occurred.
The indication of the lock-out torque occurs only:
- when hydraulic-power-given torque is released through the gearbox
casing into the aircraft structure because of too much load
downstream.
The system can be set again by operation in the opposite direction.
The indicator stays extended until it is cancelled manually.



R
EFF :
ALL
 27-84-00



AIJ




Page 29
Nov 01/10

Torque Shafts and Steady Bearings - Details


Figure 016 (SHEET 1)



EFF :
ALL
 27-84-00



AIJ




Page 30
Nov 01/10

Torque Shafts and Steady Bearings - Details


Figure 016 (SHEET 2)



EFF :
ALL
 27-84-00



AIJ




Page 31
Nov 01/10

Torque Shafts and Steady Bearings - Details


Figure 016 (SHEET 3)



EFF :
ALL
 27-84-00



AIJ




Page 32
Nov 01/10

Actuators - Sectional View


Figure 017



EFF :
ALL
 27-84-00



AIJ




Page 33
Nov 01/10

Torque Limiter
Figure 018



EFF :
ALL
 27-84-00



AIJ




Page 34
Nov 01/10

G. Tracks
(Ref. Fig. 005)
The circular-arc tracks are machined from steel and move in
grease-lubricated vertical-load and side-load rollers.
Attached to the forward face of the front spar are two ribs, one inboard
and one outboard of the track. Attached to the ribs are the rollers.
The tracks retract through holes in the front spar into sealed
containers. The sealed containers make a projection into the fuel tanks.
At each end of each moved track is a fixed stop. On retraction, the
forward stops prevent damage to the track containers, slat and leading
edge structure. The stops on the rear of the track prevent that the slat
falls from the wing when the transmission system is disconnected.
Engagement of the stops does not occur during normal operation.
The tracks are of inverted-U section. Tracks 2, 3 and 5 thru 12 have a
steel gear rack bolted in the track channel. The gear rack engages with a
pinion. Bearings between the track ribs support the pinion. The actuator
output shaft moves the pinion.
When tracks 1 and 4 are made, they can have spacers installed in the
inverted-U channel. This is to get the correct tolerance. The number of
spacers can be between zero and four.
7. ________________________________
Operation/Control and Indicating
R

(Ref. Fig. 003, 009, 011, 012)


A. Hydraulic Actuation
The SFCC1 controls the valve block of the BLUE hydraulic system and the
related motor on the PCU. The SFCC2 controls the valve block of the GREEN
hydraulic system and the related motor.
NOTE : The operation of the valve block of the BLUE hydraulic system and
____
the related motor is given. The operation of the valve block of
the GREEN hydraulic system and the related motor is the same.
NOTE : The operation of the valve block is almost the same for the
____
extension and retraction of the slats. The extend and retract
solenoid valves control the direction of the movement of the
hydraulic motor.



EFF :
ALL
 27-84-00



AIJ




Page 35
Nov 01/10

(1) Slat Extension (Retraction)


(a) When the SFCC1 receives a command to extend (retract) the slats,
it energizes the extend (retract) solenoid valve of the PCU valve
block.
(b) The energized extend (retract) solenoid valve lets hydraulic
fluid flow to one end of the spool of the PCU control valve
(referred to as the control valve spool).
(c) The control valve spool moves from the neutral position and lets
hydraulic fluid flow to:
- the POB solenoid valve
- the extend (retract) side of the motor.
(d) SFCC1
- the
- the
- the

energizes the POB solenoid valve:


POB releases
motor moves the differential gearbox in the low-speed mode
slats extend (retract).

(e) As the slats get near to the specified position:


- the SFCC1 energizes the extend (retract) solenoid valve (all
three solenoid valves are now energized)
- the two ends of the control valve spool receive fluid pressure
- equal hydraulic forces occur on the control valve spool
- the springs move the valve spool in the direction of the
neutral position
- a restriction of fluid flow to the motor occurs
- a reduction of the rate of slat travel occurs.
(f) When the slats get to the specified position:
- the SFCC1 de-energizes all three solenoid valves
- the control valve spool moves to the neutral position
- fluid flow to the motor stops
- the POB comes on.
(g) The slats stay locked by the POB until the next movement is
specified.



EFF :
ALL
 27-84-00


R 
AIJ




Page 36
Nov 01/10

B. Power Transmission
The outputs of the PCU hydraulic motor move the differential gearbox. The
differential gearbox decreases the speed of rotation and connects the two
drives into a single output. A torque shaft transmits power from the
differential gearbox to the 19 degree bevel gearbox. A second torque
shaft continues the drive to the input gear of the T-gearbox. In the
T-gearbox the direction in which the drive is aligned is changed through
90 degrees. The change of direction is by a single transverse output
shaft moved through 1:1 bevel gearing by the gearbox input.
Downstream of the T-gearbox, the operation of the transmission system is
the same for each wing. Only one wing system is specified.
Torque shafts from the T-gearbox transmit the drive to the lower of two
63.5 degree bevel gearboxes. The 63.5 degree bevel gearboxes are
installed at the wing root between RIB 1 and the fuselage. A single
torque shaft connects the two 63.5 degree gearboxes.
The 63.5 degree gearboxes transmit the movement from below the center
wing box into the wing leading edge. The movement is transmitted without
a decrease in speed. From the upper 63.5 degree gearbox more torque
shafts continue the movement through the ten rotary actuators. The
movement stops at the APPU (Ref. 27-81-00) in the wing tip.
When the torque shaft turns, it moves all the gearboxes and the input
shafts of the rotary actuators. The movement at the gearboxes and rotary
actuators occurs at the same time and at the same speed. The rotary
actuators give the necessary torque and speed decrease to move the slats
at the specified rate.
8. Bite
____
Not Applicable



EFF :
ALL
 27-84-00


R 
AIJ




Page 37
Nov 01/10

SLATS HYDRAULIC ACTUATION AND POWER TRANSMISSION - ADJUSTMENT/TEST


__________________________________________________________________
TASK 27-84-00-710-001
Operational Test of the Slat System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
R
R

29-10-00-863-001
29-10-00-863-002
29-10-00-863-003

29-10-00-864-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Pressurize the Green Hydraulic System
Pressurize the Yellow Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurize the Green Hydraulic System



EFF :
ALL
 27-84-00



AIJ




Page 501
Aug 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

29-10-00-864-002
29-10-00-864-003
31-60-00-860-001

Depressurize the Yellow Hydraulic System


Depressurize the Blue Hydraulic System
EIS Start Procedure

3. __________
Job Set-Up
Subtask 27-84-00-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons that the slat
system is in operation.
Subtask 27-84-00-860-052
B. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
R

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).

R
R

(2) Pressurize the Yellow hydraulic system


(Ref. TASK 29-10-00-863-002).

R
R

(3) Pressurize the Blue hydraulic system


(Ref. TASK 29-10-00-863-003).

R
R
R

(4) Pressurize the Green hydraulic system


(Ref. TASK 29-10-00-863-001).



EFF :
ALL
 27-84-00



AIJ




Page 502
Aug 01/07

Subtask 27-84-00-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU AUTO FLT/FAC1/26VAC
14CC1
B03
121VU AUTO FLT/FAC2/26VAC
14CC2
M18
121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2
8CV
Q21
Subtask 27-84-00-865-052
D. Make sure that this(these) circuit breaker(s) is(are) closed:
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-84-00-710-050
A. Operational Test of the Slat System
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : IF THE THRUST REVERSER COWLS ARE OPEN, MAKE SURE THAT THE HALF
_______
DOORS OF THE THRUST REVERSER ARE RETRACTED BEFORE YOU EXTEND
THE SLATS. IF THE DOORS ARE EXTENDED, YOU CAN CAUSE DAMAGE TO
THE SLATS AND HALF DOORS WHEN THE SLATS EXTEND.
R
R
R
R

(1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
(Ref. TASK 31-60-00-860-001).



EFF :
ALL
 27-84-00



AIJ




Page 503
Aug 01/07

(2) Do this test:


------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the center pedestal on the
panel 114VU:
- move the slat and flap control
lever to the position 1 and
then to the position 2. Stop at
each notch until the slats are
in their new position.

- the slats move to the set position.


On the ECAM upper DU:
- the slat position bar moves to the
set position
- the new position of the lever and the
travel direction of the slats are
shown.

2. On the panel 114VU:


- move the slat and flap control
lever to the position 3.

- the slats do not move.


On the ECAM upper DU:
- the slat position bar does not move
- the new position of the lever is
shown as above.

3. On the panel 114VU:


- move the slat and flap control
lever to the position FULL.

- the slats move to the set position.


On the ECAM upper DU:
- the slat position bar moves to the
set position
- the new position of the lever and the
travel direction of the slats are
shown.

4. On the panel 114VU:


- move the slat and flap control
lever back to the position 3.

- the slats move to the set position.


On the ECAM upper DU:
- the slat position bar moves to the
set position



EFF :
ALL
 27-84-00


R 
AIJ




Page 504
Aug 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------- the new position of the lever and the
travel direction of the slats are
shown
- no warnings related to the slat
system are shown.
5. On the panel 114VU:
- move the slat and flap control
lever back to the position 2.

- the slats do not move.


On the ECAM upper DU:
- the slat position bar does not move
- the new position of the lever is
shown.

6. On the panel 114VU:


- move the slat and flap control
lever back to the positions 1
and 0. Stop at each notch until
the slats are in their new
position.

- the slats move to the set position.


On the ECAM upper DU:
- the slat position bar moves to the
set position
- the new position of the lever and the
travel direction of the slats are
shown
- no warnings related to the slat
system are shown.

5. Close-Up
________
Subtask 27-84-00-860-053
R

A. Put the aircraft back to its initial configuration.

R
R

(1) Depressurize the Yellow hydraulic system


(Ref. TASK 29-10-00-864-002).

R
R

(2) Depressurize the Blue hydraulic system


(Ref. TASK 29-10-00-864-003).

R
R

(3) Depressurize the Green hydraulic system


(Ref. TASK 29-10-00-864-001).



EFF :
ALL
 27-84-00



AIJ




Page 505
Aug 01/07

R
R
R

(4) Do the EIS stop procedure


(Ref. TASK 31-60-00-860-001).

(5) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


Subtask 27-84-00-865-051
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
6CV, 8CV, 14CC1, 14CC2.
Subtask 27-84-00-942-050
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-00



AIJ




Page 506
Aug 01/07

SLATS HYDRAULIC ACTUATION AND POWER TRANSMISSION - INSPECTION/CHECK


___________________________________________________________________
TASK 27-84-00-200-001
Detailed Visual Inspection of the Slat Transmission System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 278400-01
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No
No
No
No
No

specific
specific
specific
specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


flashlight
mirror
safety barriers
warning notice
warning notice(s)
1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE



EFF :
ALL
 27-84-00



AIJ




Page 601
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
32-00-00-481-001

R
R
R

32-12-00-010-001
32-12-00-410-001
27-84-00-991-007
27-84-00-991-001
27-84-00-991-002

Extending the Slats on the Ground


Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Installation of the Safety Devices on the Landing
Gears
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 601
Fig. 602
Fig. 603

3. __________
Job Set-up
R

(Ref. Fig. 601/TASK 27-84-00-991-007)


Subtask 27-84-00-941-051
A. Safety Precautions
(1) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
(2) Put the safety barriers in position.



EFF :
ALL
 27-84-00



AIJ




Page 602
Feb 01/07

R
R

Slat Transmission - Access Panels


Figure 601/TASK 27-84-00-991-007



EFF :
ALL
 27-84-00



AIJ




Page 603
Feb 01/07

(3) Put a warning notice(s) in the cockpit to tell persons not to operate
the flight controls.
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Put a warning notice in position to tell persons not to operate the
MLG doors.
Subtask 27-84-00-860-056
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.
(3) Depressurize the Green and Yellow hydraulic systems.
(Ref. TASK 29-00-00-864-001).
(4) Depressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00614-001).
Subtask 27-84-00-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-00-010-051
D. Get Access
(1) Open the MLG doors (Ref. TASK 32-12-00-010-001).

(2) Make sure that the SLEEVE - GROUND LOCK is installed on each MLG door
actuating cylinder.



EFF :
ALL
 27-84-00



AIJ




Page 604
May 01/08

(3) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the applicable
wing.
(4) Open the applicable access panels:
- for the left wing, open 191BB, 191BT, 521BT, 522AB, 522CB, 522FB,
522JB, 522KB, 522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, open 192BT, 192FB, 621BT, 622AB, 622CB, 622FB,
622JB, 622KB, 622LB, 622NB, 622QB, 622SB, 622UB.

(5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in the applicable MLG
bay.
4. Procedure
_________
(Ref. Fig. 602/TASK 27-84-00-991-001, 603/TASK 27-84-00-991-002)
Subtask 27-84-00-110-050
A. Preparation for Inspection
(1) Clean the component to be inspected with a MISCELLANEOUS (Material
No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
Subtask 27-84-00-210-050
B. Detailed Visual Inspection of the Slat Transmission System
(1) Examine the Power Control Unit (PCU):
(a) Make sure that the PCU is installed correctly.
(b) Use a flashlight and a mirror and examine the external surfaces
of the PCU for:
- cracks
- corrosion
- signs of leakage
- satisfactory surface protection.
(c) Make sure that the Line Replacement Units (LRU) are correctly
installed. The LRUs are the:
- two valve blocks
- two inlet filters
- six solenoid valves
- two hydraulic motors
- two Pressure-Off Brakes
- Feedback Position Pick-off Unit
- Instrumentation Position Pick-off Unit.



EFF :
ALL
 27-84-00



AIJ




Page 605
Feb 01/11

R
R

Slat System - Component Location


Figure 602/TASK 27-84-00-991-001



EFF :
ALL
 27-84-00



AIJ




Page 606
Feb 01/07

R
R

Steady Bearings and Torque Shafts - Component Location


Figure 603/TASK 27-84-00-991-002



EFF :
ALL
 27-84-00



AIJ




Page 607
Feb 01/07

(2) Examine the Torque Shaft Assemblies:


(a) Make sure that the torque shaft assemblies are correctly
installed and that the spring clip safeties the pin correctly.
(b) Use a flashlight and mirror to examine the torque shafts and
input joints for:
- distortion
- dents
- cracks
- corrosion
- satisfactory surface protection.
(c) Make sure that the connections between the torque shafts and
input joints are tight.
(d) Do an inspection of the flange bolts for corrosion protection. If
the corrosion protection is unsatisfactory, apply a new layer of
STORAGE PRESERVATION (Material No. 15-007).
(3) Examine the Steady Bearing Assemblies:
(a) Make sure that the steady bearing assemblies are correctly
installed.
(b) Use a flashlight and a mirror to examine the steady bearing
assemblies for:
- cracks
- corrosion
- satisfactory surface protection.
(4) Examine the Gearbox Assemblies:
NOTE : The gearbox assemblies are units filled with grease and are
____
not hermetically sealed units. It is normal for this grease to
have some oil separation. The external surfaces of the gearbox
assemblies may be moist with this separated oil as they are
not sealed units. However, any separated oil in the unit that
touches the grease will be changed back during operation. The
oil separation will decrease during in-service operation until
the lubricant is in a condition that is stable. This is normal
and will not cause damage to the unit.
(a) Make sure that the gearbox assemblies are correctly installed.



EFF :
ALL
 27-84-00



AIJ




Page 608
Feb 01/07

(b) Use a flashlight and a mirror and examine the outer sides of the
gearbox assemblies for:
- cracks
- corrosion
- signs of leakage
- satisfactory surface protection.
(5) Examine the actuator assemblies:
NOTE : The actuators are vented units filled with grease. It is
____
normal for this grease to have some oil separation. The
external surfaces of the actuator assemblies may be moist with
this oil as they are not a hermetically sealed unit. However,
any oil separation in the unit that touches the grease will be
changed back during in-service operation and the lubricant is
in a condition that is stable. This is normal and will not
cause damage to the unit.
(a) Make sure that each actuator is correctly installed.
(b) Use a flashlight and a mirror to examine the external surfaces of
the actuators for:
- cracks
- corrosion
- signs of leakage
- satisfactory surface protection.
(c) Make sure that the torque limiter indicator has not operated.
5. Close-up
________
Subtask 27-84-00-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the applicable access panel:
- for the left wing, close 191BB, 191BT, 521BT, 522AB, 522CB, 522FB,
522JB, 522KB, 522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, close 192BT, 192FB, 621BT, 622AB, 622CB, 622FB,
622JB, 622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
(3) Remove the access platform(s).
(4) Close the MLG doors (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-00


R 
AIJ




Page 609
Feb 01/07

Subtask 27-84-00-865-054
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-00-866-051
C. Retract the Slats
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
slat/flap control lever.
(2) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-00-942-053
D. Removal of Equipment
(1) Remove the warning notice(s).
(2) Remove the safety barriers.
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-00



AIJ




Page 610
May 01/08

TASK 27-84-00-210-001
Detailed Visual Inspection of the Slat Track Rollers, the Pinions and the
Curved Rack Gears (As Far As Visible)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 278468-02
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
No specific
98D27803000000

circuit breaker(s) safety clip(s)


flashlight
mirror
safety barriers
warning notice(s)
1 ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-00



AIJ




Page 611
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-22-27-640-006

R
R

27-50-00-866-008
27-50-00-866-009
27-80-00-866-004
27-80-00-866-005
27-84-68-350-003
27-84-00-991-008
27-84-00-991-003

Lubrication of all Slat Track Rollers, Pinion


Bearings, Pinions and Rack Teeth
Extension of the Flaps on the Ground
Retraction of the Flaps on the Ground
Extending the Slats on the Ground
Retracting the Slats on the Ground
Repair of Damaged Flanks of the Teeth of the Slat
Track Pinions and Gear Racks
Fig. 604
Fig. 605

3. __________
Job Set-up
(Ref. Fig. 604/TASK 27-84-00-991-008)
Subtask 27-84-00-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-00-866-052
B. Flight Control Surface Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the flaps fully (Ref. TASK 27-50-00-866-008).
(2) Extend the slats fully (Ref. TASK 27-80-00-866-004).
(3) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever.



EFF :
ALL
 27-84-00



AIJ




Page 612
May 01/10

R
R

Slat Tracks - Component Access


Figure 604/TASK 27-84-00-991-008



EFF :
ALL
 27-84-00



AIJ




Page 613
Feb 01/07

Subtask 27-84-00-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-00-010-054
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
wing.
(2) Open the applicable access panel:
- for the left wing, open 521AB, 521CB, 521EB, 522AB, 522CB, 522FB,
522KB, 522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, open 621AB, 621CB, 621EB, 622AB, 622CB, 622FB,
622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
4. Procedure
_________
(Ref. Fig. 605/TASK 27-84-00-991-003)
Subtask 27-84-00-110-051
A. Clean the Components
(1) Clean these items:
- the gear racks
- the track pinions
- the track side-load rollers
- the track vertical-load rollers
with MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026) and let them dry.
Subtask 27-84-00-210-051
B. Detailed Visual Inspection of the Slat Track Rollers, the Pinions and the
Curved Rack Gears
(1) Examine the Track Vertical-Load Rollers and the Track Side-Load
Rollers:
(a) Make sure that the rollers are correctly installed.



EFF :
ALL
 27-84-00



AIJ




Page 614
Feb 01/11

R
R

Slat Gear - Racks and Pinions


Figure 605/TASK 27-84-00-991-003



EFF :
ALL
 27-84-00



AIJ




Page 615
Feb 01/07

(b) Use a flashlight and a mirror and examine the rollers for:
- cracks
- scores
- corrosion
- satisfactory surface protection.
(2) Examine the Track Pinions:
(a) Make sure that the pinions are correctly installed.
(b) Use a flashlight and a mirror and examine the pinions for:
- cracks
- scores
- corrosion
- satisfactory surface protection.
(3) Examine the Gear Racks:
(a) Make sure that the gear racks are correctly installed.
(b) Use a flashlight and a mirror and examine the gear racks for:
- cracks
- scores
- corrosion
- satisfactory surface protection.
R
R

(4) If you find damage to the teeth of the track pinions or the gear
racks, do the repair procedure (Ref. TASK 27-84-68-350-003).
Subtask 27-84-00-640-050
C. Lubricate Items After Inspection
(1) When the inspection is complete, lubricate the items that follow:
- the gear racks
- the track pinions
- the track side-load rollers
- the track vertical-load rollers
(Ref. TASK 12-22-27-640-006).



EFF :
ALL
 27-84-00



AIJ




Page 616
May 01/10

5. Close-up
________
Subtask 27-84-00-410-055
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the applicable access panels:
- for the left wing, close 521AB, 521CB, 521EB, 522AB, 522CB, 522FB,
522KB, 522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, close 621AB, 621CB, 621EB, 622AB, 622CB, 622FB,
622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
Subtask 27-84-00-865-056
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-00-866-053
C. Flight Control Surface Configuration
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(3) Retract the flaps fully (Ref. TASK 27-50-00-866-009).
Subtask 27-84-00-942-058
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-00



AIJ




Page 617
May 01/08

TASK 27-84-00-210-002
Check of Slat Transmission Shaft Integrity Including Inspection of Seal Witness
Drains
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Refer to the MPD TASK: 278100-04
NOTE : If you do this task together with MPD-TASK 278100-03, do MPD-TASK
____
278100-03 first.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
No specific
No specific
98D27803500001

circuit breaker(s)
flashlight
mirror
safety barriers
1 ACCESS PLATFORM 4M
1 ACCESS PLATFORM 2M
1 TOOL-ZERO LOCKING,

safety clip(s)

(13 FT)
(6 FT) - ADJUSTABLE
FLAP SLAT CTL LEVER



EFF :
ALL
 27-84-00



AIJ




Page 618
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-81-51-000-001
27-81-51-400-001
32-00-00-481-001
32-12-00-010-001
32-12-00-410-001
27-84-00-991-004
27-84-00-991-005
27-84-00-991-006

Removal of the Slat Wing-Tip Brake


Installation of the Slat Wing-Tip Brake
Installation of the Safety Devices on the Landing
Gears
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 606
Fig. 607
Fig. 608

3. __________
Job Set-up
R
Subtask 27-84-00-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the slat/flap control lever.
(3) Put a WARNING NOTICE(S) in position to tell persons not to operate
the slat system.



EFF :
ALL
 27-84-00



AIJ




Page 619
Feb 01/11

(4) Put a WARNING NOTICE(S) in position to tell persons not to pressurize


the hydraulic systems.
(5) Put a WARNING NOTICE(S) in position to tell persons not to operate
the landing gear doors.
(6) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
Subtask 27-84-00-020-050
B. Remove the Safety Collar
(1) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-84-00-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-84-00-010-053
D. Get Access
(1) Open the MLG doors (Ref. TASK 32-12-00-010-001).
(2) Make sure that the SLEEVE - GROUND LOCK is installed on each MLG door
actuating cylinder.
R

(3) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in the applicable MLG
bay.

(4) Put the ACCESS PLATFORM 4M (13 FT) in position below the applicable
zone 521(621) and 522(622).

R
R
R
R
R

(5) Open the applicable access panels:


(Ref. Fig. 606/TASK 27-84-00-991-004)
- for the left wing, open 191EB, 191KB, 521AT, 521CB, 521EB, 521GB,
521HB, 522AB, 522CB, 522EB, 522FB, 522LB, 522NB, 522QB, 522SB,
522UB, 521BT, 522KB, 522JB



EFF :
ALL
 27-84-00



AIJ




Page 620
Feb 01/11

Slat Transmission - Access Panels


Figure 606/TASK 27-84-00-991-004



EFF :
ALL
 27-84-00



AIJ




Page 621
Feb 01/11

R
R
R

- for the right wing, open 192EB, 192KB, 621AT, 621CB, 621EB, 621GB,
621HB, 622AB, 622CB, 622EB, 622FB, 622LB, 622NB, 622QB, 622SB,
622UB, 621BT, 622KB, 622JB.
4. Procedure
_________
(Ref. Fig. 607/TASK 27-84-00-991-005, 608/TASK 27-84-00-991-006)
Subtask 27-84-00-110-052
A. Clean the Components
(1) Clean the component to be inspected with a lint-free cotton cloth
MISCELLANEOUS (Material No. 19-003) made moist with solvent CLEANING
AGENTS (Material No. 11-026).
Subtask 27-84-00-210-052
B. Check the Integrity of the Slat Transmission System and Inspection of the
Seal Witness Drains of the Wing Tip Brakes
(1) Examine the Torque Shaft Assemblies:
(a) Use a flashlight and a mirror and examine the outer sides of the
torque shaft assemblies for:
- cracks
- signs of distortion
- signs of damage.
(2) Examine the Torque Shaft Flanges:
(a) Use a flashlight and a mirror and examine the outer sides of the
torque shaft flanges and their joints for:
- cracks
- signs of distortion
- signs of damage.
(b) Do an inspection of the flange bolts for corrosion protection. If
the corrosion protection is unsatisfactory, apply a new layer of
STORAGE PRESERVATION (Material No. 15-007).
(3) Examine the Steady Bearings:
(a) Use a flashlight and a mirror and examine the outer sides of the
steady bearings and their structural interfaces for:
- cracks
- signs of distortion



EFF :
ALL
 27-84-00



AIJ




Page 622
Feb 01/11

R
R

Torque Shaft - Steady Bearing Typical Installation


Figure 607/TASK 27-84-00-991-005



EFF :
ALL
 27-84-00



AIJ




Page 623
Feb 01/07

R
R

Wing Tip Brakes - Seal Witness Drains


Figure 608/TASK 27-84-00-991-006



EFF :
ALL
 27-84-00



AIJ




Page 624
Feb 01/07

- signs of damage.
(4) Examine the WTB:
(a) Use a flashlight and a mirror and examine the outer sides of the
WTB at the seal witness drains.
(b) The area around the seal witness drains is permitted to be wet
with oil. But, if a drop of hydraulic fluid is found, replace the
WTB (Ref. TASK 27-81-51-000-001), (Ref. TASK 27-81-51-400-001).
NOTE : The area near the seal witness drains, which is wet with
____
oil, must be cleaned.
5. Close-up
________
Subtask 27-84-00-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the applicable access panels:
- for the left wing, close 191EB, 191KB, 521AT, 521CB, 521EB, 521GB,
521HB, 522AB, 522CB, 522EB, 522FB, 522LB, 522NB, 522QB, 522SB,
522UB, 521BT, 522KB, 522JB
- for the right wing, close 192EB, 192KB, 621AT, 621CB, 621EB, 621GB,
621HB, 622AB, 622CB, 622EB, 622FB, 622LB, 622NB, 622QB, 622SB,
622UB, 621BT, 622KB, 622JB.

R
R
R
R
R
R

(3) Remove the access platform(s).


(4) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-84-00-865-058
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV.
Subtask 27-84-00-420-050
C. Install the Safety Collar
(1) Install the safety collar on the circuit breakers 9CV and 11CV.



EFF :
ALL
 27-84-00



AIJ




Page 625
Feb 01/11

Subtask 27-84-00-942-057
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-00


R 
AIJ




Page 626
Feb 01/07

TASK 27-84-00-210-003
Operational Test of Wingtip Brakes/Pressure-Off Brakes, Followed by Check of
Transmission Shafting Integrity and Inspection of Seal Witness Drains
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803500001

safety barriers
warning notice
1 ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-81-00-710-001
27-84-00-210-002
29-10-00-863-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the Wing-Tip Brake and the
Pressure-Off Brake
Check of Slat Transmission Shaft Integrity Including
Inspection of Seal Witness Drains
Pressurize the Green Hydraulic System



EFF :
ALL
 27-84-00



AIJ




Page 627
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-863-002
29-10-00-864-003
29-23-00-864-001
29-24-00-864-001
27-81-51-000-001
27-81-51-400-001
FOR FIN 6002CM, 6004CM
27-84-45-000-001
27-84-45-400-002
FOR FIN 6006CM, 6056CM
27-84-45-000-002
27-84-45-400-003
FOR FIN 6008CM, 6058CM
27-84-45-000-003
27-84-45-400-004
FOR FIN 6010CM, 6060CM
27-84-45-000-004
27-84-45-400-005

Pressurize the Yellow Hydraulic System


Depressurize the Blue Hydraulic System
Depressurize the Green and Yellow Hydraulic Systems
after Operation of the PTU
Depressurize the Yellow Hydraulic System
Removal of the Slat Wing-Tip Brake (for corrective
action)
Installation of the Slat Wing-Tip Brake (for
corrective action)
Removal of the Torque Shaft 6002CM(6004CM) (for
corrective action)
Installation of the Torque Shaft 6002CM(6004CM) (for
corrective action)
Removal of the Torque Shaft 6006CM(6056CM) (for
corrective action)
Installation of the Torque Shaft 6006CM(6056CM) (for
corrective action)
Removal of the Torque Shaft 6008CM(6058CM) (for
corrective action)
Installation of the Torque Shaft 6008CM(6058CM) (for
corrective action)
Removal of the Torque Shaft 6010CM(6060CM) (for
corrective action)
Installation of the Torque Shaft 6010CM(6060CM) (for
corrective action)

FOR FIN 6012CM, 6062CM


27-84-45-000-005

Removal of the Torque Shaft 6012CM(6062CM) (for


corrective action)
27-84-45-400-006
Installation of the Torque Shaft 6012CM(6062CM) (for
corrective action)
FOR FIN 6014CM, 6064CM, 6028CM, 6078CM, 6036CM, 6086CM, 6038CM, 6088CM, 6040CM,
6090CM, 6042CM, 6092CM, 6044CM, 6094CM
27-54-45-000-006
Removal of the Torque Shaft 6212CM(6262CM) (for
corrective action)
27-84-45-400-007
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)
/6044CM(6094CM) (for corrective action)



EFF :
ALL
 27-84-00


R 
AIJ




Page 628
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------FOR FIN 6016CM, 6066CM, 6020CM, 6070CM, 6026CM, 6076CM, 6030CM, 6080CM
27-84-45-000-007
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM) (for corrective action)
27-84-45-400-008
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM) (for corrective action)
FOR FIN 6018CM, 6068CM
27-84-45-000-008
Removal of the Torque Shaft 6018CM(6068CM) (for
corrective action)
27-84-45-400-009
Installation of the Torque Shaft 6018CM(6068CM) (for
corrective action)
FOR FIN 6022CM, 6072CM
27-84-45-000-009
Removal of the Torque Shaft 6022CM(6072CM) (for
corrective action)
27-84-45-400-010
Installation of the Torque Shaft 6022CM(6072CM) (for
corrective action)
FOR FIN 6024CM, 6074CM
27-84-45-000-010
Removal of the Torque Shaft 6024CM(6074CM) (for
corrective action)
27-84-45-400-011
Installation of the Torque Shaft 6024CM(6074CM) (for
corrective action)
FOR FIN 6032CM, 6082CM
27-84-45-000-011
Removal of the Torque Shaft 6032CM(6082CM) (for
corrective action)
27-84-45-400-012
Installation of the Torque Shaft 6032CM(6082CM) (for
corrective action)
FOR FIN 6034CM, 6084CM
27-84-45-000-012
Removal of the Torque Shaft 6034CM(6084CM) (for
corrective action)
27-84-45-400-013
Installation of the Torque Shaft 6034CM(6084CM) (for
corrective action)
FOR FIN 6046CM, 6096CM
27-84-45-000-013
Removal of the Torque Shaft 6046CM(6096CM) (for
corrective action)
27-84-45-400-014
Installation of the Torque Shaft 6046CM(6096CM) (for
corrective action)
FOR FIN 6007CM, 6057CM
27-84-44-000-001
Removal of the Steady Bearing FIN 6007CM(6057CM) (for
corrective action)
27-84-44-400-001
Installation of the Steady Bearing FIN 6007CM(6057CM)
(for corrective action)
FOR FIN 6017CM, 6067CM, 6019CM, 6069CM



EFF :
ALL
 27-84-00



AIJ




Page 629
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-44-000-002
27-84-44-400-002
FOR FIN 6021CM, 6071CM
27-84-44-000-003
27-84-44-400-003
FOR FIN 6023CM, 6073CM
27-84-44-000-004
27-84-44-400-004
FOR FIN 6025CM, 6075CM
27-84-44-000-005
27-84-44-400-005
FOR FIN 6031CM, 6081CM
27-84-44-000-006
27-84-44-400-006

Removal of the Steady Bearings FIN


6017CM(6067CM)/6019CM(6069CM) (for corrective action)
Installation of the Steady Bearings FIN
6017CM(6067CM)/6019CM(6069CM) (for corrective action)
Removal of the Steady Bearing FIN 6021CM(6071CM) (for
corrective action)
Installation of the Steady Bearing FIN 6021CM(6071CM)
(for corrective action)
Removal of the Steady Bearing FIN 6023CM(6073CM) (for
corrective action)
Installation of the Steady Bearing FIN 6023CM(6073CM)
(for corrective action)
Removal of the Steady Bearing FIN 6025CM(6075CM) (for
corrective action)
Installation of the Steady Bearing FIN 6025CM(6075CM)
(for corrective action)
Removal of the Steady Bearing FIN 6031CM(6081CM) (for
corrective action)
Installation of the Steady Bearing FIN 6031CM(6081CM)
(for corrective action)

3. __________
Job Set-up
Subtask 27-84-00-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the slat/flap control lever.
(3) Put a warning notice in position to tell persons not to operate the
slat system.



EFF :
ALL
 27-84-00


R 
AIJ




Page 630
Feb 01/07

Subtask 27-84-00-860-054
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Pressurize the Green Hydraulic system (Ref. TASK 29-10-00-863-001).
(3) Pressurize the Yellow Hydraulic system (Ref. TASK 29-10-00-863-002).
Subtask 27-84-00-010-055
C. Get Access
R

(1) Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position below the
applicable zone 521(621) and 522(622).
(2) Open the applicable access panels:
- for the left wing, open 191BB, 191BT, 191EB, 191KB, 521AB, 521CB,
521EB, 521GB, 521HB, 522AB, 522CB, 522EB, 522FB, 522JB, 522KB,
522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, open 192BT, 192CT, 192EB, 192FB, 192KB, 621AB,
621CB, 621EB, 621GB, 621HB, 622AB, 622CB, 622EB, 622FB, 622JB,
622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
4. Procedure
_________
Subtask 27-84-00-210-053
A. Operational Test of Wingtip Brakes/Pressure-Off Brakes, Followed by Check
of Transmission Shafting Integrity and Inspection of Seal Witness Drains
(1) Do an operational test of the wing-tip brake and the pressure-off
brake (Ref. TASK 27-81-00-710-001).
(2) Do the trouble-shooting of the system and do the applicable
correction(s) (Ref. TSM 27). Use the Fault Symptom(s) as entry into
the Trouble Shooting Manual (TSM).
(3) Do a check of the integrity of the slat transmission system and
inspection of the seal witness drains of the wing-tip brakes
(Ref. TASK 27-84-00-210-002).



EFF :
ALL
 27-84-00



AIJ




Page 631
Feb 01/11

(4) Replace the Defective Components of the Slat Transmission System.


(a) Replace the applicable torque shafts:
1
_

FOR 6002CM, 6004CM


(Ref. TASK 27-84-45-000-001) and (Ref. TASK 27-84-45-400-002)

2
_

FOR 6006CM, 6056CM


(Ref. TASK 27-84-45-000-002) and (Ref. TASK 27-84-45-400-003)

3
_

FOR 6008CM, 6058CM


(Ref. TASK 27-84-45-000-003) and (Ref. TASK 27-84-45-400-004)

4
_

FOR 6010CM, 6060CM


(Ref. TASK 27-84-45-000-004) and (Ref. TASK 27-84-45-400-005)

5
_

FOR 6012CM, 6062CM


(Ref. TASK 27-84-45-000-005) and (Ref. TASK 27-84-45-400-006)

_
6
_

FOR 6014CM, 6064CM, 6028CM, 6078CM, 6036CM, 6086CM, 6038CM,


6088CM, 6040CM, 6090CM, 6042CM, 6092CM, 6044CM, 6094CM
(Ref. TASK 27-54-45-000-006) and (Ref. TASK 27-84-45-400-007)

_
7
_

FOR 6016CM, 6066CM, 6020CM, 6070CM, 6026CM, 6076CM, 6030CM,


6080CM
(Ref. TASK 27-84-45-000-007) and (Ref. TASK 27-84-45-400-008)

8
_

FOR 6018CM, 6068CM


(Ref. TASK 27-84-45-000-008) and (Ref. TASK 27-84-45-400-009)

9
_

FOR 6022CM, 6072CM


(Ref. TASK 27-84-45-000-009) and (Ref. TASK 27-84-45-400-010)

10
__

FOR 6024CM, 6074CM


(Ref. TASK 27-84-45-000-010) and (Ref. TASK 27-84-45-400-011)

11
__

FOR 6032CM, 6082CM


(Ref. TASK 27-84-45-000-011) and (Ref. TASK 27-84-45-400-012)

12
__

FOR 6034CM, 6084CM


(Ref. TASK 27-84-45-000-012) and (Ref. TASK 27-84-45-400-013)

13
__

FOR 6046CM, 6096CM


(Ref. TASK 27-84-45-000-013) and (Ref. TASK 27-84-45-400-014).



EFF :
ALL
 27-84-00


R 
AIJ




Page 632
May 01/10

(b) Replace the applicable steady bearing:


1
_

FOR 6007CM, 6057CM


(Ref. TASK 27-84-44-000-001) and (Ref. TASK 27-84-44-400-001)

2
_

FOR 6017CM, 6067CM, 6019CM, 6069CM


(Ref. TASK 27-84-44-000-002) and (Ref. TASK 27-84-44-400-002)

3
_

FOR 6021CM, 6071CM


(Ref. TASK 27-84-44-000-003) and (Ref. TASK 27-84-44-400-003)

4
_

FOR 6023CM, 6073CM


(Ref. TASK 27-84-44-000-004) and (Ref. TASK 27-84-44-400-004)

5
_

FOR 6025CM, 6075CM


(Ref. TASK 27-84-44-000-005) and (Ref. TASK 27-84-44-400-005)

6
_

FOR 6031CM, 6081CM


(Ref. TASK 27-84-44-000-006) and (Ref. TASK 27-84-44-400-006).

(c) Replace the applicable wing-tip brake 35CV(36CV) (Ref. TASK 2781-51-000-001) and (Ref. TASK 27-81-51-400-001).
5. Close-up
________
Subtask 27-84-00-860-055
A. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
(2) De-pressurize the Yellow and Blue Hydraulic systems (Ref. TASK 29-2400-864-001) and (Ref. TASK 29-10-00-864-003).
(3) De-pressurize the Green Hydraulic system (Ref. TASK 29-23-00-864001).



EFF :
ALL
 27-84-00


R 
AIJ




Page 633
May 01/10

Subtask 27-84-00-410-056
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the applicable access panels:
- for the left wing, close 191BB, 191BT, 191EB, 191KB, 521AB, 521CB,
521EB, 521GB, 521HB, 522AB, 522CB, 522EB, 522FB, 522JB, 522KB,
522LB, 522NB, 522QB, 522SB, 522UB
- for the right wing, close 192BT, 192CT, 192EB, 192FB, 192KB, 621AB,
621CB, 621EB, 621GB, 621HB, 622AB, 622CB, 622EB, 622FB, 622JB,
622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
Subtask 27-84-00-942-061
C. Close Access
R

(1) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-00



AIJ




Page 634
May 01/08

GEARBOX - BEVEL 19 DEG (6003CM) - REMOVAL/INSTALLATION


______________________________________________________
TASK 27-84-41-000-001
Removal of the Bevel Gearbox 6003CM
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-41



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------21-52-22-000-001
27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
27-84-41-991-001

Removal of the Fan Plenum Chamber 10HM5 (11HM5).


Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401

3. __________
Job Set-up
Subtask 27-84-41-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-41-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-41-860-050
C. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.


(2) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).



EFF :
ALL
 27-84-41



AIJ




Page 402
Feb 01/11

(3) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
R

(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to


lock the left slat transmission.

(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to


lock the right slat transmission.
Subtask 27-84-41-010-050
D. Get Access
(1) Remove the access panel 191KB.
(2) Remove the heat exchanger unit 10HM4 together with the fan plenum
chamber 10HM5 (Ref. TASK 21-52-22-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-41-991-001)
Subtask 27-84-41-020-050
A. Removal of the Bevel Gearbox
(1) Disconnect the torque shaft 6004CM (13) as follows:
(a) Remove the nuts (11) and the bolts (12) which connect the torque
shaft (13) to the input universal joint (10) of the bevel gearbox
(1).
(b) Disconnect the torque shaft (13) from the input universal joint
(10).
(c) Remove the input universal joint (10) from the bevel gearbox (1).
(2) Disconnect the torque shaft 6002CM (7) as follows:
(a) Remove the nuts (5) and the bolts (6) which connect the torque
shaft (7) to the input universal joint (4) of the bevel gearbox
(1).
(b) Disconnect the torque shaft (7) from the input universal joint
(4).
(c) Remove the input universal joint (4) from the bevel gearbox (1).



EFF :
ALL
 27-84-41



AIJ




Page 403
Nov 01/08

R
R

19 Degree Bevel Gearbox


Figure 401/TASK 27-84-41-991-001



EFF :
ALL
 27-84-41



AIJ




Page 404
Feb 01/07

(3) Hold the bevel gearbox (1) so that it can not fall.
(4) Remove the bolts (16) and the washers (17) which attach the bevel
gearbox (1) to the support bracket.
(5) Remove the bevel gearbox (1).



EFF :
ALL
 27-84-41



AIJ




Page 405
Feb 01/07

TASK 27-84-41-400-001
Installation of the Bevel Gearbox 6003CM
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
98D27504030001
98D27803000000

warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-41



AIJ




Page 406
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-005
R
R

Material No. 09-013


Material No. 09-019

R
Material No. 11-002
R
R

Material No. 16-021

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
21-52-22-400-001
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
27-84-41-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Installation of the Fan Plenum Chamber 10HM5 (11HM5)
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401



EFF :
ALL
 27-84-41



AIJ




Page 407
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-41-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).
(5) Make sure that the warning notice in position to tell persons not to
pressurize the hydraulic systems.
(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
Subtask 27-84-41-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-41-991-001)
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surface of the gearbox may be moist with



EFF :
ALL
 27-84-41



AIJ




Page 408
Feb 01/11

this separated oil as it is not a sealed unit. However, any separated


oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-84-41-910-051
A. Preparation for Installation
(1) To install the same gearbox, clean the splined surfaces of the
connections with CLEANING AGENTS (Material No. 11-002).
(2) Apply SEALANTS (Material No. 09-019) to the face of the bevel gearbox
(1) which touches the support bracket.
Subtask 27-84-41-420-050
B. Installation of the Bevel Gearbox
(1) Put the bevel gearbox (1) in position on the support bracket.
(2) Attach the bevel gearbox (1) to the support bracket with the bolts
(16) and the washers (17).
(3) At the bonding point continue as follows (Ref. TASK 20-28-00-912004):
(a) Seal bolt (16) with SEALANTS (Material No. 09-013).
(b) Apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue) to the
bonding point.
(4) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolt heads (16).
(5) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joints (4), (10).
(6) Engage the input universal joints (4), (10) of the bevel gearbox (1)
in the bevel gearbox inputs.
(7) Install the torque shaft 6002CM (7) as follows:
(a) Put the torque shaft (7) in position.
(b) Make sure that the flange holes of the torque shaft (7) are in
line with the flange holes of the input universal joint (4).



EFF :
ALL
 27-84-41


R 
AIJ




Page 409
Feb 01/11

(c) If the flange holes of the torque shaft are not in line with the
flange holes of the input universal joint (4), continue as
follows:
1
_

Remove the input universal joint (4).

2
_

Turn the input universal joint (4) by the number of splines


necessary to put it in line.

3
_

Install the input universal joint (4).

(d) Install the bolts (6) to connect the torque shaft (7) to the
input universal joint (4).
(e) Install the nuts (5) on the bolts (6).
(f) Examine the assembly of the input universal joint (10) as
follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.

(h) TORQUE the nuts (5) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (6)
and the nuts (5).
(8) Install the torque shaft 6004CM (13) as follows:
(a) Put the torque shaft (13) in position.
(b) Make sure that the flange holes of torque shaft (13) are in line
with the flange holes of the input universal joint (10).
(c) If the flange holes of the torque shaft (13) are not in line with
the flange holes of the input universal joint (10), continue as
follows:
1
_

Remove the input universal joint (10).



EFF :
ALL
 27-84-41


R 
AIJ




Page 410
Feb 01/11

2
_

Turn the input universal joint (10) by the number of splines


necessary to put it in line.

3
_

Install the input universal joint (10).

(d) Install the bolts (12) to connect the torque shaft (13) to the
input universal joint (10).
(e) Install the nuts (11) on the bolts (12).
(f) Examine the assembly of the input universal joint (10) as
follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.

(h) TORQUE the nuts (11) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (12)
and the nuts (11).
Subtask 27-84-41-860-051
C. Preparation for the Test
(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission.
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Remove the warning notice(s).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-84-41


R 
AIJ




Page 411
Feb 01/11

Subtask 27-84-41-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-41-710-050
E. Do the operational test of the Slat System. (Ref. TASK 27-84-00-710-001)
5. Close-up
________
Subtask 27-84-41-410-050
A. Close Access
(1) Install the fan plenum chamber 10HM5 together with the heat exchanger
10HM4 (Ref. TASK 21-52-22-400-001).
(2) Install the access panel 191KB.
(3) Remove the access platform(s).



EFF :
ALL
 27-84-41


R 
AIJ




Page 412
Feb 01/11

GEARBOX - TEE (6005CM) - REMOVAL/INSTALLATION


_____________________________________________
TASK 27-84-42-000-001
Removal of the Tee Gearbox 6005CM
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-42



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
27-84-42-991-001
27-84-42-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-84-42-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-42-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC
53HH
W22
122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC
55HH
W21
122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC
56HH
Y21
122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC
54HH
Y20



EFF :
ALL
 27-84-42



AIJ




Page 402
Nov 01/08

Subtask 27-84-42-860-050
C. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.


(2) Depressurize the Green and Blue hydraulic systems and put them in the
maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the right slat transmission.
Subtask 27-84-42-010-050
D. Get Access
(Ref. Fig. 401/TASK 27-84-42-991-001)
(1) Remove the access panel 191BB.
(2) Disconnect the V-clamp (4).
(3) Disconnect the clamp (2).
(4) Remove the bellows (3), the clamp (2) and the V-clamp (4).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-42-991-002)
Subtask 27-84-42-020-050
A. Removal of the Tee Gearbox
(1) Disconnect the torque shaft 6004CM (9) as follows:
(a) Remove the nuts (7) and the bolts (8) which connect the torque
shaft (9) to the input universal joint (6) of the tee gearbox
(1).
(b) Disconnect the torque shaft (9) from the input universal joint
(6).



EFF :
ALL
 27-84-42



AIJ




Page 403
Feb 01/11

R
R

Tee Gearbox (Sheet 1)


Figure 401/TASK 27-84-42-991-001



EFF :
ALL
 27-84-42



AIJ




Page 404
Feb 01/07

R
R

Tee Gearbox (Sheet 2)


Figure 402/TASK 27-84-42-991-002



EFF :
ALL
 27-84-42



AIJ




Page 405
Feb 01/07

(2) Disconnect the torque shaft 6006CM (26) as follows:


(a) Remove the nuts (7) and the bolts (8) which connect the torque
shaft (26) to the left input universal joint (22) of the tee
gearbox (1).
(b) Disconnect the torque shaft (26) from the left input universal
joint (22).
(c) Remove the left input universal joint (22) from the tee gearbox
(1).
(3) Remove the tee gearbox (1) as follows:
(a) Hold the tee gearbox (1) so that it can not fall.
(b) Remove the bolts (18) and the washers (19) which attach the tee
gearbox (1) to the support bracket.
(c) Carefully move the tee gearbox (1) away from the input universal
joint (15) and remove the tee gearbox (1).
(d) Move the spring (5) and remove the pin (10).
(e) Remove the input universal joint (6) from the tee gearbox (1).



EFF :
ALL
 27-84-42



AIJ




Page 406
Feb 01/07

TASK 27-84-42-400-001
Installation of the Tee Gearbox 6005CM
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-42



AIJ




Page 407
Feb 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-005
R
R

Material No. 09-013


Material No. 09-019

R
Material No. 11-002
R
R

Material No. 16-021

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
27-84-42-991-001
27-84-42-991-002

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401
Fig. 402



EFF :
ALL
 27-84-42



AIJ




Page 408
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-42-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).
(5) Make sure that the warning notice in position to tell persons not to
pressurize the hydraulic systems.
(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
Subtask 27-84-42-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC
53HH
W22
122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC
55HH
W21
122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC
56HH
Y21
122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC
54HH
Y20



EFF :
ALL
 27-84-42



AIJ




Page 409
Feb 01/11

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-42-991-002)
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surface of the gearbox may be moist with
this separated oil as it is not a sealed unit. However, any separated
oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-84-42-910-050
A. Preparation for Installation
(1) To install the same gearbox, clean the splined surfaces of the
connections with CLEANING AGENTS (Material No. 11-002).
(2) Apply SEALANTS (Material No. 09-019) to the face of the tee gearbox
6005CM (1) which touches the support bracket.
(3) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joint (6).
Subtask 27-84-42-420-050
B. Installation of the Tee Gearbox
(1) Install the input universal joint (6) as follows:
(a) Engage the input universal joint (6) of the tee gearbox (1) in
the tee gearbox input.
(b) Install the pin (10).
(c) Safety the pin (10) with the spring (5).
(2) Connect the torque shaft 6004CM (9) as follows:
(a) Put the tee gearbox (1) in position.
(b) Make sure that the flange holes of the torque shaft (9) are in
line with the flange holes of the input universal joint (6).



EFF :
ALL
 27-84-42


R 
AIJ




Page 410
Feb 01/11

(c) If the flange holes of the torque shaft (9) are not in line with
the flange holes of the input universal joint (6), continue as
follows:
1
_

Turn the input universal joint (6) as necessary to put it in


line.

(d) Install the bolts (8) to connect the torque shaft (9) to the
input universal joint (6).
(e) Install the nuts (7) on the bolts (8).
(f) TORQUE the nuts (7) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(g) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (8)
and the nuts (7).
(3) Apply COMMON GREASE (Material No. 04-018) to the splines of the right
input universal joint (15).
(4) Engage the right input universal joint (15) of tee gearbox (1) in the
right input of the tee gearbox (1).
(5) Put the tee gearbox (1) in position on the support bracket.
(6) Attach the tee gearbox (1) to the support bracket with the bolts (18)
and the washers (19).
(7) At the bonding point continue as follows (Ref. TASK 20-28-00-912004):
(a) Seal bolt (18) with SEALANTS (Material No. 09-013).
R

(b) Apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue) to the
bonding point.
(8) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolt heads (18).
(9) Examine the assembly of the input universal joint (15) as follows:
(a) Measure dimension X. Dimension X must be a minimum of 6.5 mm
(0.2559 in.).
(b) Make sure that you can not see the indicator groove.



EFF :
ALL
 27-84-42



AIJ




Page 411
Nov 01/08

(10) If you can see the indictor groove continue as follows:


(a) Measure all the related torque shafts, universal joints and
gearboxes and refer to LIEBHERR technical data.
(11) Apply COMMON GREASE (Material No. 04-018) to the splines of the left
input universal joint (22).
(12) Engage the left input universal joint (22) of tee gearbox (1) in the
left input of the tee gearbox.
(13) Install the torque shaft 6006CM (26) as follows:
(a) Put the torque shaft (26) in position.
(b) Make sure that the flange holes of the torque shaft (26) are in
line with the flange holes of the input universal joint (22).
(c) If the flange holes of the torque shaft (26) are not in line with
the flange holes of the input universal joint (22), continue as
follows:
1
_

Remove the input universal joint (22).

2
_

Turn the input universal joint (22) by the number of splines


necessary to put it in line.

3
_

Install the input universal joint (22).

(d) Install the bolts (8) to connect the torque shaft (26) to the
input universal joint (22).
(e) Install the nuts (7) on the bolts (8).
(f) Examine the assembly of the input universal joint (22) as
follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.



EFF :
ALL
 27-84-42


R 
AIJ




Page 412
Nov 01/08

(h) TORQUE the nuts (8) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (8)
and the nuts (7).
Subtask 27-84-42-860-051
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission.

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission.

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Remove the warning notice(s).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-42-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-42-710-050
E. Do the operational test of the slat system, (Ref. TASK 27-84-00-710-001).
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-42-991-001)
Subtask 27-84-42-410-050
A. Close Access
(1) Install the bellows (3) as follows:
(a) Install the V-clamp (4), the bellows (3) and the clamp (2).



EFF :
ALL
 27-84-42



AIJ




Page 413
Nov 01/08

(2) TORQUE the V-clamp (4) to 0.55 m.daN (48.67 lbf.in).


(a) TORQUE the clamp (2) to 0.28 m.daN (24.77 lbf.in).
(3) Install the access panel 191BB.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the access platform(s).
Subtask 27-84-42-865-053
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
53HH, 54HH, 55HH, 56HH



EFF :
ALL
 27-84-42


R 
AIJ




Page 414
Nov 01/08

GEARBOX - BEVEL 63.5 DEG (6009CM,6011CM,6059CM,6061CM) - REMOVAL/INSTALLATION


_____________________________________________________________________________
TASK 27-84-43-000-001
Removal of the Bevel Gearbox 63.5 6009CM,6011CM (6059CM,6061CM)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the 63.5 degree bevel gearboxes 6009CM/6011CM
____
is specified. The procedure for the 63.5 degree bevel gearboxes
(6059CM/6061CM) is almost the same. If there are differences in the
procedures they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-43



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
27-84-43-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401

3. __________
Job Set-up
Subtask 27-84-43-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-43-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-43-010-051
C. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position.


(2) FOR 6009CM, 6011CM
below access panels 191BT, 191CT.
(3) FOR 6059CM, 6061CM



EFF :
ALL
 27-84-43



AIJ




Page 402
Feb 01/11

(4) Remove the applicable access panels:


FOR 6009CM, 6011CM
remove 191BT, 191CT.
FOR 6059CM, 6061CM
remove 192BT, 192CT. below access panels 192BT, 192CT.
Subtask 27-84-43-860-050
D. Aircraft Maintenance Configuration
(1) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).
(2) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
R

(3) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to


lock the slat transmission:
FOR 6009CM, 6011CM
lock the left slat transmission system,
FOR 6059CM, 6061CM
lock the right slat transmission system.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-43-991-001)
Subtask 27-84-43-020-051
A. Removal of the Bevel Gearbox
(1) Disconnect the torque shaft 6012CM (6062CM) (5) as follows:
(a) Remove the nuts (4) and the bolts (3) which connect the torque
shaft (5) to the input splined joint (2) of the bevel gearbox
6011CM (6061CM) (1).
(b) Disconnect the torque shaft (5) from the input splined joint (2).
(c) Remove the input splined joint (2) from the bevel gearbox (1).
(2) Disconnect the torque shaft 6010CM (6060CM) (12) as follows:
(a) Remove the nuts (4) and the bolts (3) which connect the torque
shaft (12) to the input splined joints (8),(13) of the bevel
gearboxes 6009CM (6059CM) (14) and 6011CM (6061CM) (1).



EFF :
ALL
 27-84-43



AIJ




Page 403
Nov 01/08

R
R

63.5 Degree Bevel Gearbox


Figure 401/TASK 27-84-43-991-001



EFF :
ALL
 27-84-43



AIJ




Page 404
Feb 01/07

(b) Disconnect the torque shaft (12) from the input splined joints
(13),(8).
(3) Remove the input splined joint (8) from the bevel gearbox (1), as
follows:
(a) Remove the pin (6) and the spring (7).
(b) Remove the input splined joint (8) from the bevel gearbox (1).
(4) Remove the bevel gearbox 6011CM (6061CM) (1) as follows:
(a) Hold the bevel gearbox (1) so that it can not fall.
(b) Remove the bolts (10) and the washers (9) which attach the bevel
gearbox (1) to the support bracket.
(c) Remove the bevel gearbox (1).
(5) Remove the input splined joint (13) from the bevel gearbox 6009CM
(6059CM) (14).
(6) Disconnect the torque shaft 6008CM (6058CM) (18) as follows:
(a) Remove the nuts (4) and the bolts (3) which connect the torque
shaft (18) to the input universal joint (17) of the bevel gearbox
(14).
(b) Disconnect the torque shaft (18) from the input universal joint
(17).
(7) Remove the input universal joint (17) from the bevel gearbox (14) as
follows:
(a) Remove the pin (6) and the spring (7).
(b) Remove the input universal joint (17) from the bevel gearbox
(14).
(8) Hold the bevel gearbox (14) so that it can not fall.
(9) Remove the bolts (10) and the washers (9) which attach the bevel
gearbox (14) to the support bracket.
(10) Remove the bevel gearbox (14).



EFF :
ALL
 27-84-43



AIJ




Page 405
Feb 01/07

TASK 27-84-43-400-001
Installation of the Bevel Gearbox 63.5 6009CM,6011CM (6059CM,6061CM)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
R
R
R
R
R
R
R
R
R

WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS


_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
NOTE : The installation procedure for the 63.5 degree bevel gearboxes
____
6009CM/6011CM is specified. The procedure for the 63.5 degree bevel
gearboxes 6059CM/6061CM is almost the same. If there are differences in
the procedures they are specified.
1. __________________
Reason for the Job
Self Explanatory



EFF :
ALL
 27-84-43



AIJ




Page 406
Nov 01/08

2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 05-005
Material No. 09-013
Material No. 09-019
Material No. 11-002
Material No. 16-003
Material No. 16-021

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)



EFF :
ALL
 27-84-43



AIJ




Page 407
Feb 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-002
20-28-00-912-004
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
27-84-43-991-001

Electrical Bonding of Components With Conductive


Bolts and Screws in the Tanks
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Fig. 401

3. __________
Job Set-up
Subtask 27-84-43-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).
(5) Make sure that the warning notice in position to tell persons not to
pressurize the hydraulic systems.
(6) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.



EFF :
ALL
 27-84-43



AIJ




Page 408
Feb 01/11

R
R

(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
Subtask 27-84-43-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-43-991-001)
NOTE : The gearbox is a unit filled with grease and is not a hermetically
____
sealed unit. It is normal for this grease to have some oil
separation. The external surface of the gearbox may be moist with
this separated oil as it is not a sealed unit. However, any separated
oil in the unit that touches the grease will be changed back during
operation. The oil separation will decrease during in-service
operation until the lubricant is in a condition that is stable. This
is normal and will not cause damage to the unit.
Subtask 27-84-43-910-051
A. Preparation for Installation

R
(1) To install the same gearbox, clean the splined surfaces of the
connections with CLEANING AGENTS (Material No. 11-002).
(2) Apply SEALANTS (Material No. 09-019) to the face of the bevel gearbox
6009CM (6059CM) (14) which touches the support bracket.
Subtask 27-84-43-420-051
B. Installation of the Bevel Gearbox
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Put the bevel gearbox (14) in position on the support bracket.
(4) Attach the bevel gearbox (14) to the support bracket with the bolts
(10) and the washers (9).



EFF :
ALL
 27-84-43



AIJ




Page 409
Nov 01/08

(5) TORQUE the bolts (10) to between 0.78 and 0.96 m.daN (69.02 and 84.95
lbf.in)
(6) At the bonding point continue as follows (Ref. TASK 20-28-00-912004):
(a) Seal the bolt (10) with SEALANTS (Material No. 09-013).
R

(b) Apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue) to the
bonding point.
(7) Apply SPECIAL MATERIALS (Material No. 05-005) to the heads of the
bolts (10).
(8) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joint (17).
(9) Install the input universal joint (17) as follows:
(a) Engage the input universal joint (17) of the bevel gearbox (14)
in the bevel gearbox input.
(b) Install the pin (6).
(c) Safety the pin (6) with the spring (7).
(10) Install the torque shaft 6008CM (6058CM) (18) as follows:
(a) Put the torque shaft (18) in position.
(b) Make sure that the flange holes of the torque shaft (18) are in
line with the flange holes of the input universal joint (17).
(c) If the flange holes of the torque shaft (18) are not in line with
the flange holes of the input universal joint (17), continue as
follows:
1
_

Turn the input universal joint (17) as necessary to put it in


line.

(d) Install the bolts (3) to connect the torque shaft (18) to the
input universal joint (17).
(e) Install the nuts (4) on the bolts (3).
(f) TORQUE the nuts (4) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).



EFF :
ALL
 27-84-43



AIJ




Page 410
Nov 01/08

(g) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (3)
and the nuts (4).
(11) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
splined joint (13).
(12) Engage the input splined joint (13) of the bevel gearbox (14) in the
bevel gearbox input.
(13) Apply SEALANTS (Material No. 09-019) to the face of the bevel gearbox
6011CM (6061CM) (1) which touches the support bracket.
(14) Put the bevel gearbox (1) in position on the support bracket.
(15) Attach the bevel gearbox (1) to the support bracket with the bolts
(10) and the nuts (9).
(16) TORQUE the bolts (10) to between 0.78 and 0.96 m.daN (69.02 and 84.95
lbf.in).
(17) At the bonding point continue as follows (Ref. TASK 20-28-00-912002):
(a) Seal the bolt (10) with SEALANTS (Material No. 09-013).
(b) Apply STRUCTURE PAINTS (Material No. 16-003) (dyed blue) to the
bonding point.
(18) Apply SPECIAL MATERIALS (Material No. 05-005) to the heads of the
bolts (10).
(19) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
splined joint (8).
(20) Install the input splined joint (8) as follows:
(a) Engage the input splined joint (8) of the bevel gearbox (1) in
the bevel gearbox input.
(b) Install the pin (6).
(c) Safety the pin (6) with the spring (7).



EFF :
ALL
 27-84-43



AIJ




Page 411
Feb 01/07

(21) Install the torque shaft 6010CM (6060CM) (12) as follows:


(a) Put the torque shaft (12) in position.
(b) Install the bolts (3) to connect the torque shaft (12) to the
input splined joint (8).
(c) Install the nuts (4) on the bolts (3).
(d) Make sure that the flange holes of the torque shaft (12) are in
line with the flange holes of the input splined joint (13).
(e) If the flange holes of the torque shaft (12) are not in line with
the flange holes of the input splined joint (13), continue as
follows:
1
_

Remove the nuts (4) and the bolts (3) which connect the torque
shaft (12) to the input splined joint (8).

2
_

Disconnect the torque shaft (12) from the input splined joints
(13),(8).

3
_

Remove the input splined joint (13).

4
_

Turn the input splined joint (13) by the number of splines


necessary to put it in line.

5
_

Install the input splined joint (13).

6
_

Put the torque shaft (12) in position.

7
_

Install the bolts (3) to connect the torque shaft (12) to the
input splined joint (8).

8
_

Install the nuts (4) on the bolts (3).

(f) TORQUE the nuts (4) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(g) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (3)
and the nuts (4).
(h) Install the bolts (3) to connect the torque shaft (12) to the
input splined joint (13).
(i) Install the nuts (4) on the bolts (3).



EFF :
ALL
 27-84-43



AIJ




Page 412
Feb 01/07

(j) Examine the assembly of the input splined joint (13) as follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(k) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shaft, universal joints and


gearboxes and refer to LIEBHERR technical data.

2
_

TORQUE the nuts (4) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).

(l) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (3)
and the nuts (4).
(22) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joint (2).
(23) Engage the input universal joint (2) of the bevel gearbox (1) in the
bevel gearbox input.
(24) Install the torque shaft 6012CM (6062CM) (5) as follows:
(a) Put the torque shaft (5) in position.
(b) Make sure that the flange holes of the torque shaft (5) are in
line with the flange holes of the input universal joint (2).
(c) If the flange holes of the torque shaft (5) are not in line with
the flange holes of the input universal joint (2), continue as
follows:
1
_

Remove the input universal joint (2).

2
_

Turn the input universal joint (2) by the number of splines


necessary to put it in line.

3
_

Install the input universal joint (2).

(d) Install the bolts (3) to connect the torque shaft (5) to the
input universal joint (2).
(e) Install the nuts (4) on the bolts (3).



EFF :
ALL
 27-84-43



AIJ




Page 413
Feb 01/07

(f) Examine the assembly of the input universal joint (2) as follows:
1
_

Measure dimension X. Dimension X must be a minimum of 6.5 mm


(0.2559 in.).

2
_

Make sure that you can not see the indicator groove.

(g) If you can see the indicator groove continue as follows:


1
_

Measure all the related torque shafts, universal joints and


gearboxes and refer to LIEBHERR technical data.

(h) TORQUE the nuts (4) to between 1.02 and 1.24 m.daN (90.26 and
109.73 lbf.in).
(i) Apply SPECIAL MATERIALS (Material No. 05-005) to the bolts (3)
and the nuts (4).
Subtask 27-84-43-860-051
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS)


FOR 6059CM, 6061CM
from the right slat transmission.
FOR 6009CM, 6011CM
from the left slat transmission.

(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(3) Remove the warning notice(s).
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-43-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-43-710-050
E. Do the operational test of the slat system (Ref. TASK 27-84-00-710-001).



EFF :
ALL
 27-84-43



AIJ




Page 414
Nov 01/08

5. Close-up
________
Subtask 27-84-43-410-050
A. Close Access
(1) Install the applicable access panels:
FOR 6009CM, 6011CM
install 191BT, 191CT.
FOR 6059CM, 6061CM
install 192BT, 192CT.
(2) Remove the access platform(s).



EFF :
ALL
 27-84-43


R 
AIJ




Page 415
Feb 01/07

______________________________________________________________________________
STEADY
BEARING ASSY - TRANSMISSION (6007CM,6017CM,6019CM,6021CM,6023CM,6025CM,
6031CM,6057CM,6067CM,6069CM,6071CM,6073CM,6075CM...) - REMOVAL/INSTALLATION
___________________________________________________________________________
R

TASK 27-84-44-000-001
Removal of the Steady Bearing FIN 6007CM(6057CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

27-84-45-000-002
32-12-00-010-001
27-84-44-991-001
FOR FIN 6057CM
27-50-00-400-003

Removal of the Torque Shaft 6006CM(6056CM)


Open the Main Gear Doors for Access
Fig. 401
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)



EFF :
ALL
 27-84-44



AIJ




Page 401
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-44-991-001)
Subtask 27-84-44-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-062
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-052
C. Get Access
(1) Put an access platform in position below the applicable torque shaft.
(2) Open the main gear doors (Ref. TASK 32-12-00-010-001).
R

(3) Make sure that the SLEEVE - GROUND LOCK in on the applicable main
gear door actuator.
(4) Remove the applicable torque shaft (6) (Ref. TASK 27-84-45-000-002):
FOR 6007CM
remove the torque shaft FIN 6006CM
FOR 6057CM
remove the torque shaft FIN 6056CM.



EFF :
ALL
 27-84-44



AIJ




Page 402
Nov 01/08

R
R

Steady Bearings - Slat Power Transmission


Figure 401/TASK 27-84-44-991-001



EFF :
ALL
 27-84-44



AIJ




Page 403
Feb 01/07

R
R

(5) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-44-991-001)
Subtask 27-84-44-020-050
A. Removal of the Steady Bearing FIN 6007CM (6057CM)
(1) Remove the bolts (3) and the nuts (1).
(2) Remove the steady bearing (5) from the torque shaft (4) and the
steady bearing bracket (2).



EFF :
ALL
 27-84-44



AIJ




Page 404
Nov 01/08

TASK 27-84-44-400-001
Installation of the Steady Bearing FIN 6007CM(6057CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 405
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-00-710-001
27-84-45-400-003
32-12-00-010-001
32-12-00-410-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Operational Test of the Slat System
Installation of the Torque Shaft 6006CM(6056CM)
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access

3. __________
Job Set-up
Subtask 27-84-44-941-062
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
(3) Make sure that the warning notice is in position to tell persons not
to operate the landing gear doors.
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-050
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-44


R 
AIJ




Page 406
Feb 01/07

Subtask 27-84-44-860-050
C. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable torque shaft.
(2) Make sure that the main gear doors are open (Ref. TASK 32-12-00-010001).
(3) Make sure that the SLEEVE - GROUND LOCK is on the applicable main
gear door actuator.
(4) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
4. Procedure
_________
Subtask 27-84-44-420-056
R

A. Preparation for Installation


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) with CLEANING AGENTS


(Material No. 11-026) to clean the component interface and/or the
adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (5) and the steady bearing
bracket (2)
- the shanks of the bolts (3).



EFF :
ALL
 27-84-44



AIJ




Page 407
Aug 01/11

Subtask 27-84-44-420-057
B. Installation of the Steady Bearing FIN 6007CM (6057CM)
(1) Attach the steady bearing (5) to the torque shaft (4) and the steady
bearing bracket (2) with the bolts (3) and the nuts (1).
(2) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (1)
bolts (3)
flange of the steady bearing (5).

(3) Install the applicable torque shaft (6) (Ref. TASK 27-84-45-400-003):
(a) FOR 6007CM
install the torque shaft FIN 6006CM
(b) FOR 6057CM
install the torque shaft FIN 6056CM.
Subtask 27-84-44-710-050
C. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-44-865-063
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 6CV, 7CV.
Subtask 27-84-44-410-052
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the MLG doors (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-44


R 
AIJ




Page 408
Aug 01/11

Subtask 27-84-44-942-050
C. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44


R 
AIJ




Page 409
Feb 01/07

TASK 27-84-44-000-002
Removal of the Steady Bearings FIN 6017CM(6067CM)/6019CM(6069CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-45-000-007
R
R

27-84-44-991-001
27-84-44-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Fig. 401
Fig. 402



EFF :
ALL
 27-84-44



AIJ




Page 410
Feb 01/07

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-44-991-001, 402/TASK 27-84-44-991-002)
Subtask 27-84-44-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-064
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-053
C. Get Access
(1) Put an access platform in position below the applicable torque shaft.
(2) Remove the applicable torque shaft (20) (Ref. TASK 27-84-45-000-007):
- FOR 6017CM
remove the torque shaft FIN 6016CM
- FOR 6019CM
remove the torque shaft FIN 6020CM
- FOR 6067CM
remove the torque shaft FIN 6066CM
- FOR 6069CM
remove the torque shaft FIN 6070CM.
R
R

(3) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).



EFF :
ALL
 27-84-44



AIJ




Page 411
Nov 01/08

R
R

Steady Bearings - Slat Power Transmission


Figure 402/TASK 27-84-44-991-002



EFF :
ALL
 27-84-44



AIJ




Page 412
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-84-44-991-002)


Subtask 27-84-44-020-051
A. Removal of the Steady Bearing
(1) Remove the bolts (16), then remove the steady bearing (19) from the
torque shaft (18) and the nose rib (17).



EFF :
ALL
 27-84-44



AIJ




Page 413
Feb 01/07

TASK 27-84-44-400-002
Installation of the Steady Bearings FIN 6017CM(6067CM)/6019CM(6069CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 414
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-00-710-001
27-84-45-000-008
27-84-45-400-008
FOR FIN 6069CM
27-50-00-400-003

Operational Test of the Slat System


Removal of the Torque Shaft 6018CM(6068CM)
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)

3. __________
Job Set-up
Subtask 27-84-44-941-063
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable torque shaft.
(2) Make sure that the applicable torque shaft (20) (Ref. TASK 27-84-45000-008) has been removed:
R
R

(a) FOR 6017CM


remove the torque shaft FIN 6016CM

R
R

(b) FOR 6019CM


remove the torque shaft FIN 6020CM

R
R

(c) FOR 6067CM


remove the torque shaft FIN 6066CM



EFF :
ALL
 27-84-44



AIJ




Page 415
May 01/10

(d) FOR 6069CM


remove the torque shaft FIN 6070CM.
(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
Subtask 27-84-44-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
Subtask 27-84-44-420-058
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) with CLEANING AGENTS


(Material No. 11-026) to clean the component interface and/or the
adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.



EFF :
ALL
 27-84-44



AIJ




Page 416
Aug 01/11

(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material


No. 09-019) to:
- the mating faces of the steady bearing (19) and the nose rib (17)
- the shanks of the bolts (16).
Subtask 27-84-44-420-060
B. Installation of the Steady Bearings
(1) Attach the steady bearing (19) to the torque shaft (18) and the nose
rib (17) with the bolts (16).
(2) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (16) and the flange of the steady bearing (19).
Subtask 27-84-44-410-055
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (20) (Ref. TASK 27-84-45-400008):
R
R

(a) FOR 6017CM


install the torque shaft FIN 6016CM

R
R

(b) FOR 6019CM


install the torque shaft FIN 6020CM

R
R

(c) FOR 6067CM


install the torque shaft FIN 6066CM

R
R

(d) FOR 6069CM


install the torque shaft FIN 6070CM.
Subtask 27-84-44-710-051
D. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).



EFF :
ALL
 27-84-44



AIJ




Page 417
May 01/10

5. Close-up
________
Subtask 27-84-44-865-065
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 6CV, 7CV.
Subtask 27-84-44-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44


R 
AIJ




Page 418
May 01/10

TASK 27-84-44-000-003
Removal of the Steady Bearing FIN 6021CM(6071CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-45-000-007
R
R

27-84-44-991-001
27-84-44-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Fig. 401
Fig. 402



EFF :
ALL
 27-84-44



AIJ




Page 419
Feb 01/07

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-44-991-001, 402/TASK 27-84-44-991-002)


Subtask 27-84-44-941-060
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever.
Subtask 27-84-44-865-066
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1
6CV
B07
49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-050
C. Get Access
(1) Put the access platform in position below the applicable access
panel.
(2) Remove the applicable access panel:
- FOR 6021CM
remove 521GB
- FOR 6071CM
remove 621GB.
(3) Remove the applicable torque shaft (26) (Ref. TASK 27-84-45-000-007):
- FOR 6021CM
remove the torque shaft FIN 6020CM
- FOR 6071CM
remove the torque shaft FIN 6070CM.



EFF :
ALL
 27-84-44



AIJ




Page 420
Feb 01/07

R
R

(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-44-991-002)
Subtask 27-84-44-020-052
A. Removal of the Steady Bearing FIN 6021CM (6071CM)
(1) Remove the nuts (24) and the bolts (21).
(2) Remove the steady bearing (22) from the torque shaft (25) and the
nose rib (23).



EFF :
ALL
 27-84-44



AIJ




Page 421
Nov 01/08

TASK 27-84-44-400-003
Installation of the Steady Bearing FIN 6021CM(6071CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 422
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-00-710-001
27-84-45-400-008
FOR FIN 6071CM
27-50-00-400-003

Operational Test of the Slat System


Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)

3. __________
Job Set-up
Subtask 27-84-44-941-064
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
Subtask 27-84-44-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable torque shaft.
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
(3) Make sure that the applicable torque shaft (26) is removed (Ref. TASK
27-84-45-400-008):
R
R

(a) FOR 6021CM


remove the torque shaft FIN 6020CM

R
R

(b) FOR 6071CM


remove the torque shaft FIN 6070CM.
(4) Make sure that the applicable access panel(s) have been removed:

R
R

(a) FOR 6021CM


remove 521GB

R
R

(b) FOR 6071CM


remove 621GB.



EFF :
ALL
 27-84-44



AIJ




Page 423
May 01/10

(5) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
Subtask 27-84-44-865-052
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
Subtask 27-84-44-420-061
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) with CLEANING AGENTS


(Material No. 11-026) to clean the component interface and/or the
adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (22) and the nose rib (23)
- the shanks of the bolts (21).



EFF :
ALL
 27-84-44



AIJ




Page 424
Aug 01/11

Subtask 27-84-44-420-062
B. Installation of the Steady Bearing FIN 6021CM (6071CM)
(1) Attach the steady bearing (22) to the torque shaft (25) and the nose
rib (23) with the bolts (21) and the nuts (24).
(2) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


bolts (21)
nuts (24)
flange of the steady bearing (22).

Subtask 27-84-44-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-410-050
D. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (26) (Ref. TASK 27-84-45-400008):
FOR 6021CM
install the torque shaft FIN 6020CM
FOR 6071CM
install the torque shaft FIN 6070CM.
(3) Install the applicable access panel:
FOR 6021CM
install 521GB
FOR 6071CM
install 621GB.
Subtask 27-84-44-865-056
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-44


R 
AIJ




Page 425
Feb 01/07

Subtask 27-84-44-710-052
F. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-44-942-052
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44


R 
AIJ




Page 426
Feb 01/07

TASK 27-84-44-000-004
Removal of the Steady Bearing FIN 6023CM(6073CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-45-000-009
27-84-44-991-001
27-84-44-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Removal of the Torque Shaft 6022CM(6072CM)
Fig. 401
Fig. 402



EFF :
ALL
 27-84-44



AIJ




Page 427
Nov 01/08

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-44-991-001, 402/TASK 27-84-44-991-002)
Subtask 27-84-44-941-058
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-067
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-054
C. Get Access
(1) Put the access platform in position below the applicable zone 521
(621).
(2) Remove the applicable access panels 521AT (621AT).
(3) Remove the applicable torque shaft (31) (Ref. TASK 27-84-45-000-009):
- FOR 6023CM
remove the torque shaft FIN 6022CM
- FOR 6073CM
remove the torque shaft FIN 6072CM.
R
R

(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed (Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-44



AIJ




Page 428
Nov 01/08

4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-84-44-991-002)


Subtask 27-84-44-020-053
A. Removal of the Steady Bearing FIN 6023CM (6073CM)
(1) Remove the bolts (27), then remove the steady bearing (30) from the
torque shaft (29) and the steady bearing bracket (28).



EFF :
ALL
 27-84-44



AIJ




Page 429
Feb 01/07

TASK 27-84-44-400-004
Installation of the Steady Bearing FIN 6023CM(6073CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 430
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-00-710-001
27-84-45-400-010

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Operational Test of the Slat System
Installation of the Torque Shaft 6022CM(6072CM)

3. __________
Job Set-up
Subtask 27-84-44-941-065
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever.
Subtask 27-84-44-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable zone 521 (621).
(2) Make sure that the applicable access panel 521AT (621AT) is removed.
R

(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-44



AIJ




Page 431
Nov 01/08

Subtask 27-84-44-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
Subtask 27-84-44-420-063
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean the component interface and/or
the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (30) and the steady bearing
bracket (28)
- the shanks of the bolts (27).



EFF :
ALL
 27-84-44



AIJ




Page 432
Aug 01/11

Subtask 27-84-44-420-064
B. Installation of the Steady Bearing FIN 6023CM (6073CM)
(1) Attach the steady bearing (30) to the torque shaft (29) and the
steady bearing bracket (28) with the bolts (27).
(2) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (27) and the flange of the steady bearing (30).
Subtask 27-84-44-410-053
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (31) (Ref. TASK 27-84-45-400010):
- FOR 6023CM
install the torque shaft FIN 6022CM
- FOR 6073CM
install the torque shaft FIN 6072CM.
(3) Install the applicable access panels 521AT (621AT).
Subtask 27-84-44-865-060
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-44-710-053
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).



EFF :
ALL
 27-84-44


R 
AIJ




Page 433
Feb 01/07

5. Close-up
________
Subtask 27-84-44-942-053
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44


R 
AIJ




Page 434
Feb 01/07

TASK 27-84-44-000-005
Removal of the Steady Bearing FIN 6025CM(6075CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-45-000-007

R
R
R

27-84-45-000-010
57-41-37-000-004
27-84-44-991-001
27-84-44-991-002
FOR FIN 6075CM

Removal of the Torque Shafts


6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Removal of the Torque Shaft 6024CM(6074CM)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Fig. 401
Fig. 402



EFF :
ALL
 27-84-44



AIJ




Page 435
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-44-991-001, 402/TASK 27-84-44-991-002)
Subtask 27-84-44-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-068
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-055
C. Get Access
R
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
applicable access panels.

R
R

(2) Remove the applicable access panel 521EB, 522AB, 522CB (621EB, 622AB,
622CB) (Ref. TASK 57-41-37-000-004).
(3) Remove the applicable torque shaft (37) (Ref. TASK 27-84-45-000-010):
(a) FOR 6025CM
remove the torque shaft FIN 6024CM



EFF :
ALL
 27-84-44



AIJ




Page 436
May 01/10

(b) FOR 6075CM


remove the torque shaft FIN 6074CM.
(4) Remove the applicable torque shaft (34) (Ref. TASK 27-84-45-000-007):
(a) FOR 6025CM
remove the torque shaft FIN 6026CM
(b) FOR 6075CM
remove the torque shaft FIN 6076CM.
(5) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-44-991-002)
Subtask 27-84-44-020-054
A. Removal of the Steady Bearing FIN 6025CM (6075CM)
(1) Remove the bolts (33), then remove the anti-flailing cap (32) and the
steady bearing (35) from the nose rib (36).



EFF :
ALL
 27-84-44


R 
AIJ




Page 437
May 01/10

TASK 27-84-44-400-005
Installation of the Steady Bearing FIN 6025CM(6075CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 438
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-00-710-001
27-84-45-000-007

R
R
R

27-84-45-000-010
27-84-45-400-011
57-41-37-000-004
FOR FIN 6075CM
27-84-45-400-008

R
R
R

57-41-37-400-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Operational Test of the Slat System
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Removal of the Torque Shaft 6024CM(6074CM)
Installation of the Torque Shaft 6024CM(6074CM)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)

3. __________
Job Set-up
Subtask 27-84-44-941-066
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever.



EFF :
ALL
 27-84-44



AIJ




Page 439
May 01/10

Subtask 27-84-44-860-054
B. Aircraft Maintenance Configuration
(1) Make sure that the adjustable access platform is below the applicable
access panel.
(2) Make sure that the applicable access panel is removed 521EB, 522AB,
522CB (621EB, 622AB, 622CB) (Ref. TASK 57-41-37-000-004).

(3) Make sure that the applicable torque shaft (37) has been removed
(Ref. TASK 27-84-45-000-010):
(a) FOR 6025CM
remove the torque shaft FIN 6024CM
(b) FOR 6075CM
remove the torque shaft 6074CM.
(4) Make sure that the applicable torque shaft (34) has been removed
(Ref. TASK 27-84-45-000-007):
(a) FOR 6025CM
remove the torque shaft FIN 6026CM
(b) FOR 6075CM
remove the torque shaft 6076CM.
(5) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
Subtask 27-84-44-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-44



AIJ




Page 440
May 01/10

4. Procedure
_________
Subtask 27-84-44-420-065
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
AGENTS (Material No. 11-026) to clean the component interface and/or
the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (35) and the nose rib (36)
- the shanks of the bolts (33).
Subtask 27-84-44-420-066
B. Installation of the Steady Bearing FIN 6025CM (6075CM)
(1) Use the bolts (33) to attach the steady bearing (35) and the
anti-flailing cap (32) to the nose rib (36).
(2) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (33) and the flange of the steady bearing (35).
Subtask 27-84-44-410-054
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (37) (Ref. TASK 27-84-45-400011):
(a) FOR 6025CM
install the torque shaft FIN 6024CM



EFF :
ALL
 27-84-44



AIJ




Page 441
Aug 01/11

(b) FOR 6075CM


install the torque shaft FIN 6074CM.
(3) Install the applicable torque shaft (34) (Ref. TASK 27-84-45-400008):
(a) FOR 6025CM
install the torque shaft FIN 6026CM
(b) FOR 6075CM
install the torque shaft FIN 6076CM.
R
R

(4) Install the applicable access panels 521EB, 522AB, 522CB (621EB,
622CB, 622EB) (Ref. TASK 57-41-37-400-002).
Subtask 27-84-44-865-061
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-44-710-054
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-44-942-054
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44



AIJ




Page 442
May 01/10

TASK 27-84-44-000-006
Removal of the Steady Bearing FIN 6031CM(6081CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
adjustable access platform 3.6 m (11 ft. 10 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R

27-84-44-991-001
27-84-44-991-002
FOR FIN 6081CM
27-50-00-400-003
27-84-45-000-007

Fig. 401
Fig. 402
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)



EFF :
ALL
 27-84-44



AIJ




Page 443
Feb 01/07

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-44-991-001, 402/TASK 27-84-44-991-002)


Subtask 27-84-44-941-061
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-44-865-069
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-44-010-051
C. Get Access
(1) Put an adjustable access platform in position below the applicable
zone 522 (622).
(2) Remove the applicable access panel:
- FOR 6031CM
remove 522EB
- FOR 6081CM
remove 622EB.
(3) Remove the applicable torque shaft (43) (Ref. TASK 27-84-45-000-007):
- FOR 6031CM
remove the torque shaft FIN 6030CM
- FOR 6081CM
remove the torque shaft FIN 6080CM.



EFF :
ALL
 27-84-44



AIJ




Page 444
Feb 01/07

R
R

(4) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-44-991-002)
Subtask 27-84-44-020-055
A. Removal of the Steady Bearing FIN 6031CM (6081CM)
(1) Remove the bolts (38) and the nuts (40).
(2) Remove the steady bearing (42) from the torque shaft (41) and the
nose rib (39).



EFF :
ALL
 27-84-44



AIJ




Page 445
Nov 01/08

TASK 27-84-44-400-006
Installation of the Steady Bearing FIN 6031CM(6081CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-018
Material No. 09-019
R
R

Material No. 11-026


Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-44



AIJ




Page 446
Aug 01/11

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-84-00-710-001
27-84-45-400-008

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Operational Test of the Slat System
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)

3. __________
Job Set-up
Subtask 27-84-44-941-067
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in the cockpit to tell persons
not to operate the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap/slat control lever.
Subtask 27-84-44-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the adjustable access platform is below the applicable
zone 522 (622).
(2) Make sure that the applicable access panel 522EB (622EB) is removed.
R

(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-44



AIJ




Page 447
Nov 01/08

Subtask 27-84-44-865-057
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
Subtask 27-84-44-420-067
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R
R

(1) Use a MISCELLANEOUS (Material No. 19-003) maede moist with CLEANING
AGENTS (Material No. 11-026) to clean the component interface and/or
the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to:
- the mating faces of the steady bearing (42) and the nose rib (39)
- the shanks of the bolts (38).



EFF :
ALL
 27-84-44



AIJ




Page 448
Aug 01/11

Subtask 27-84-44-420-069
B. Installation of the Steady Bearing FIN 6031CM (6081CM)
(1) Attach the steady bearing (42) to the torque shaft (41) and the nose
rib (39) with the bolts (38) and the nuts (40).
(2) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


bolts (38)
nuts (40)
flange of the steady bearing (42).

(3) Install the applicable torque shaft (43) (Ref. TASK 27-84-45-400008):
FOR 6031CM
install the torque shaft FIN 6030CM
FOR 6081CM
install the torque shaft FIN 6080CM.
Subtask 27-84-44-865-059
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-44-710-055
D. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-44-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
- FOR 6031CM
install 522EB
- FOR 6081CM
install 622EB.



EFF :
ALL
 27-84-44


R 
AIJ




Page 449
Feb 01/07

Subtask 27-84-44-942-055
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-44


R 
AIJ




Page 450
Feb 01/07

____________________________________________________________________________
TORQUE
SHAFT ASSY - TRANSMISSION (6002CM,6004CM,6006CM,6008CM,6010CM,6012CM,
6014CM,6016CM,6018CM,6020CM,6022CM,6024CM,6026CM...) - REMOVAL/INSTALLATION
___________________________________________________________________________
TASK 27-84-45-000-001
Removal of the Torque Shaft 6002CM(6004CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-84-45



AIJ




Page 401
Aug 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------21-52-41-000-001
27-50-00-400-003

R
R

27-80-00-866-005
32-12-00-010-001
27-84-45-991-001
27-84-45-991-002

Removal of the Air Conditioning Pack 10HM (11HM)


Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-45-991-001, 402/TASK 27-84-45-991-002)


Subtask 27-84-45-941-071
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-84-45-860-064
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-45



AIJ




Page 402
Feb 01/07

R
R

Torque shafts - Slat Power Transmission


Figure 401/TASK 27-84-45-991-001



EFF :
ALL
 27-84-45



AIJ




Page 403
Feb 01/07

Torque Shafts - Slat Power Transmission


Figure 402/TASK 27-84-45-991-002



EFF :
ALL
 27-84-45



AIJ




Page 404
May 01/09

Subtask 27-84-45-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-050
D. Get Access
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK is on the applicable main
gear door actuator.
(3) Remove the air conditioning pack 10HM (Ref. TASK 21-52-41-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-050
A. Removal of the Torque Shafts 6002CM/6004CM

(1) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) on


the torque shaft 6006CM(6056CM) (Ref. TASK 27-50-00-400-003).
(2) Remove the nuts (2), the bolts (4) and the shaft (3).
(3) Remove the universal joint (1).
(4) Remove the retaining ring (6), the pin (7) and the universal joint
(5).



EFF :
ALL
 27-84-45



AIJ




Page 405
Aug 01/08

TASK 27-84-45-400-002
Installation of the Torque Shaft 6002CM(6004CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45



AIJ




Page 406
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------21-52-41-000-001
21-52-41-400-001
27-50-00-000-003
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
32-12-00-010-001
32-12-00-410-001
27-84-45-991-001
27-84-45-991-002

Removal of the Air Conditioning Pack 10HM (11HM)


Installation of the Air Conditioning Pack 10HM (11HM)
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-058
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
(3) Make sure that the warning notice is in position to tell persons not
to operate the landing gear doors.
Subtask 27-84-45-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
R

(3) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
on the torque shaft 6006CM(6056CM) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-45



AIJ




Page 407
Aug 01/08

(4) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).
(5) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(6) Make sure that the air conditioning pack 10HM is removed (Ref. TASK
21-52-41-000-001).
Subtask 27-84-45-865-058
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-064
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45



AIJ




Page 408
Nov 01/09

Subtask 27-84-45-420-065
B. Installation of the Torque Shaft 6002CM(6004CM)
(1) Put the retaining ring (6) on the shaft (3).
(2) Install the universal joint (5) and attach it with the pin (7) and
the retaining ring (6).
(3) Install the universal joint (1).
(4) Install the shaft (3) and attach it with the bolts (4) and the nuts
(2).
(5) TORQUE the nuts (2) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(6) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (2)
bolts (4)
flanges of the universal joints (1) and (5)
flanges of the shaft (3).

(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the torque shaft
6006CM(6056CM) (Ref. TASK 27-50-00-000-003).
Subtask 27-84-45-210-051
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-059
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 409
Nov 01/09

Subtask 27-84-45-710-050
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.
5. Close-up
________
Subtask 27-84-45-410-050
A. Close Access
(1) Install the air conditioning pack 10HM (Ref. TASK 21-52-41-400-001).
(2) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-84-45-942-050
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 410
Nov 01/09

TASK 27-84-45-000-002
Removal of the Torque Shaft 6006CM(6056CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
32-12-00-010-001
53-35-13-000-002
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Open the Main Gear Doors for Access
Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
Fig. 401
Fig. 402



EFF :
ALL
 27-84-45



AIJ




Page 411
Aug 01/08

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-072
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-84-45-860-065
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-051
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-051
D. Get Access
(1) Open the applicable main gear door (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK is on the applicable main
gear door actuator.
(3) Remove the applicable access panels 191BB, 192FB (Ref. TASK 53-35-13000-002).



EFF :
ALL
 27-84-45



AIJ




Page 412
Aug 01/08

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-051
A. Removal of the Torque Shafts 6006CM(6056CM)
R

(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)


(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(2) Remove the nuts (10), the bolts (11) and the shaft (9).
(3) Remove the universal joint (8).



EFF :
ALL
 27-84-45



AIJ




Page 413
Aug 01/08

TASK 27-84-45-400-003
Installation of the Torque Shaft 6006CM(6056CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
98D27504030001

safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45



AIJ




Page 414
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
32-12-00-010-001
32-12-00-410-001
53-35-13-000-002
53-35-13-400-002
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
Installation of the Quick-Release Access Panels on
the Belly Fairing Structure
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-059
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
(3) Make sure that the warning notice is in position to tell persons not
to operate the landing gear doors.
Subtask 27-84-45-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).
R

(2) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.



EFF :
ALL
 27-84-45



AIJ




Page 415
Aug 01/08

(3) Make sure that the applicable access panel 191BB, 192FB is removed
(Ref. TASK 53-35-13-000-002).
(4) Make sure that the slats are fully retracted (Ref. TASK 27-80-00-866005).
(5) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(6) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the removed component
- on the torque shaft, outboard of the removed component.
Subtask 27-84-45-865-060
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-066
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45



AIJ




Page 416
Nov 01/09

Subtask 27-84-45-420-067
B. Installation of the Torque Shaft 6006CM(6056CM)
(1) Install the universal joint (8).
(2) Install the shaft (9) and attach it with the bolts (11) and the nuts
(10).
(3) TORQUE the nuts (10) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (10)
bolts (11)
flange of the universal joint (8)
flanges of the shaft (9).

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the applicable component.
Subtask 27-84-45-210-054
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-062
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 417
Nov 01/09

Subtask 27-84-45-710-051
E. Test
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.
5. Close-up
________
Subtask 27-84-45-410-051
A. Close Access
(1) Install the applicable access panels 191BB, 192FB (Ref. TASK 53-3513-400-002).
(2) Close the MLG doors (Ref. TASK 32-12-00-410-001).
Subtask 27-84-45-942-051
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 418
Nov 01/09

TASK 27-84-45-000-003
Removal of the Torque Shaft 6008CM(6058CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-44-000-001
53-35-13-000-002
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearing FIN 6007CM(6057CM)
Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
Fig. 401
Fig. 402



EFF :
ALL
 27-84-45



AIJ




Page 419
Aug 01/08

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-073
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-066
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-097
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-060
D. Get Access
(1) Remove the access panels 191BB, 192FB (Ref. TASK 53-35-13-000-002).
R

(2) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)


(Ref. TASK 27-50-00-400-003):
- on a torque shaft, indoard of the applicable component
- on a torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-45



AIJ




Page 420
Aug 01/08

(3) Remove the applicable steady bearing (15) (Ref. TASK 27-84-44-000001):
- FOR 6008CM
remove the steady bearing FIN 6007CM
- FOR 6058CM
remove the steady bearing FIN 6057CM.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-84-45-991-001, 402/TASK 27-84-45-991-002)


Subtask 27-84-45-020-052
A. Removal of the Torque Shafts FIN 6008CM(6058CM)
(1) Remove the retaining ring (18), the pin (12) and then the universal
joint (13).



EFF :
ALL
 27-84-45



AIJ




Page 421
Feb 01/07

TASK 27-84-45-400-004
Installation of the Torque Shaft 6008CM(6058CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
FOR FIN 6058CM
98D27504030001

safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45



AIJ




Page 422
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-44-000-001
27-84-44-400-001
53-35-13-000-002
53-35-13-400-002
R
R

27-84-45-991-001
27-84-45-991-002
FOR FIN 6058CM
27-50-00-000-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearing FIN 6007CM(6057CM)
Installation of the Steady Bearing FIN 6007CM(6057CM)
Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
Installation of the Quick-Release Access Panels on
the Belly Fairing Structure
Fig. 401
Fig. 402
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-45-991-001)


Subtask 27-84-45-941-060
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-45



AIJ




Page 423
Feb 01/07

(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(4) Make sure that the applicable steady bearing (15) is removed
(Ref. TASK 27-84-44-000-001).
(5) Make sure that the applicable access panel 191BB, 192FB is removed
(Ref. TASK 53-35-13-000-002).
Subtask 27-84-45-865-063
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-068
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45



AIJ




Page 424
Nov 01/09

Subtask 27-84-45-420-069
B. Installation of the Torque Shaft 6008CM(6058CM)
(1) Put the retaining ring (18) in position over the shaft (14).
(2) Install the universal joint (13) and attach it with the pin (12) and
the retaining ring (18).
(3) Install the shaft (14) and attach it with the bolts (17) and the nuts
(16).
(4) TORQUE the nuts (16) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(5) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (16)
bolts (17)
flange of the universal joint (13)
flange of the shaft (14).

(6) Install the applicable steady bearing (15) (Ref. TASK 27-84-44-400001):
- FOR 6008CM
install the steady bearing 6007CM
- FOR 6058CM
install the steady bearing 6057CM.
(7) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(8) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft inboard of the applicable component
- from the torque shaft outboard of the applicable component.
Subtask 27-84-45-865-098
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 425
Nov 01/09

Subtask 27-84-45-710-058
D. Test
(1) The operational test of the slat power-transmission system is
contained in the installation of the steady bearing (Ref. TASK 27-8444-400-001).
5. Close-up
________
Subtask 27-84-45-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels 191BB, 192FB (Ref. TASK 53-35-13-400-002).
Subtask 27-84-45-942-052
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 426
Nov 01/09

TASK 27-84-45-000-004
Removal of the Torque Shaft 6010CM(6060CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003

R
R
R
R

27-80-00-866-005
32-12-00-010-001
53-35-11-000-001
57-41-37-000-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Open the Main Gear Doors for Access
Removal of the Wing-to-Fuselage Fairings
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)



EFF :
ALL
 27-84-45



AIJ




Page 427
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-45-991-001
27-84-45-991-002

Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
(3) Put a warning notice in position to tell persons not to operate the
landing gear doors.
Subtask 27-84-45-860-067
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-052
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45


R 
AIJ




Page 428
May 01/10

Subtask 27-84-45-010-052
D. Get Access
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
(2) Make sure that the SLEEVE - GROUND LOCK in on the applicable main
gear door actuator.
R

(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below
zones 191, 192.
(4) Remove the applicable access panel:
(a) FOR 6010CM
remove 191CT and 521AB

R
R
R

(b) FOR 6060CM


remove 192CT and 621AB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 53-35-11-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-053
A. Removal of the Torque Shafts 6010CM(6060CM)
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(2) Remove the nuts (4), the bolts (2) and the shaft (3).
(3) Remove the universal joint (1).
(4) Remove the retaining ring (6), the pin (7) and the universal joint
(5).



EFF :
ALL
 27-84-45



AIJ




Page 429
May 01/10

TASK 27-84-45-400-005
Installation of the Torque Shaft 6010CM(6060CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 430
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003

R
R
R
R
R
R
R
R

27-80-00-866-005
27-84-00-710-001
32-12-00-010-001
53-35-11-000-001
53-35-11-400-001
57-41-37-000-004
57-41-37-400-002
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Open the Main Gear Doors for Access
Removal of the Wing-to-Fuselage Fairings
Installation of the Wing-to-Fuselage Fairings
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-061
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
(3) Make sure that the warning notice is in position to tell persons not
to operate the landing gear doors.
Subtask 27-84-45-860-054
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-45



AIJ




Page 431
May 01/10

(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(4) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).
(5) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
actuator.
(6) Make sure that the access platform is in position below the
applicable zone 191, 192.
(7) Make sure that the applicable access panels 191BT, 192BT, 521AB,
621AB have been removed (Ref. TASK 57-41-37-000-004) and (Ref. TASK
53-35-11-000-001).

R
R

Subtask 27-84-45-865-064
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-070
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45



AIJ




Page 432
May 01/10

Subtask 27-84-45-420-071
B. Installation of the Torque Shaft 6010CM(6060CM)
(1) Put the retaining ring (6) on the shaft (3).
(2) Install the universal joint (5) and attach it with the pin (7) and
the retaining ring (6).
(3) Install the universal joint (1).
(4) Install the shaft (3) and attach it with the bolts (2) and the nuts
(4).
(5) TORQUE the nuts (4) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(6) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (4)
bolts (2)
flanges of the universal joints (1) and (5)
flanges of the shaft (3).

(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00400-003):
- from the torque shaft, outboard of the applicable component
- from the torque shaft, inboard of the applicable component.
Subtask 27-84-45-210-058
C. Dimensional/Visual Check
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-065
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 433
Nov 01/09

Subtask 27-84-45-710-052
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-066
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-052
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) FOR 6010CM
install 191BT and 521AB
R
R
R

(b) FOR 6060CM


install 192BT and 621AB
(Ref. TASK 57-41-37-400-002) and (Ref. TASK 53-35-11-400-001).
Subtask 27-84-45-865-067
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45



AIJ




Page 434
May 01/10

Subtask 27-84-45-942-053
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 435
Feb 01/07

TASK 27-84-45-000-005
Removal of the Torque Shaft 6012CM(6062CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
R
R
R
R
R

27-80-00-866-005
53-35-11-000-001
57-41-37-000-004
57-41-37-000-005

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Wing-to-Fuselage Fairings
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)



EFF :
ALL
 27-84-45



AIJ




Page 436
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-45-991-001
27-84-45-991-003

Fig. 401
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-068
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45


R 
AIJ




Page 437
May 01/10

Subtask 27-84-45-010-053
D. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below
zones 191, 192.
(2) Remove the applicable access panels:
(a) FOR 6012CM
remove 521AB, 521CB and 521BB, 191BT

R
R
R
R

(b) FOR 6062CM


remove 621AB, 621CB and 621BB, 192BT
(Ref. TASK 57-41-37-000-004), (Ref. TASK 57-41-37-000-005) and
(Ref. TASK 53-35-11-000-001).
4. Procedure
_________
(Ref. Fig. 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-054
A. Removal of the Torque Shafts 6012CM(6062CM)
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(2) Remove the nuts (36) and (38), the bolts (37) and (39) and then the
shaft (29). If applicable, remove the spacers.
(3) Remove the nuts (32), the bolts (31) and the shaft (30).
NOTE : Spacers between the universal joint (35), the shaft (30) and
____
the shaft (29) adjust the length of the transmission. It is
possible that there are none or more than one installed.
(4) Remove the universal joint (28).
(5) Remove the retaining ring (34), the pin (33) and the universal joint
(35).



EFF :
ALL
 27-84-45



AIJ




Page 438
May 01/10

R
R

Torque Shafts - Slat Power Transmission


Figure 403/TASK 27-84-45-991-003



EFF :
ALL
 27-84-45



AIJ




Page 439
Feb 01/07

TASK 27-84-45-400-006
Installation of the Torque Shaft 6012CM(6062CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 11-026
Material No. 15-007
Material No. 19-003

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45



AIJ




Page 440
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003

R
R
R
R
R
R
R
R
R
R

27-80-00-866-005
27-84-00-710-001
53-35-11-000-001
53-35-11-400-001
57-41-37-000-004
57-41-37-000-005
57-41-37-400-002
57-41-37-400-005
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Wing-to-Fuselage Fairings
Installation of the Wing-to-Fuselage Fairings
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the NACA Duct Panel 521BB(621BB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-062
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
R
R

(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft inboard of the applicable component
- on the torque shaft outboard of the applicable component.



EFF :
ALL
 27-84-45



AIJ




Page 441
May 01/10

(4) Make sure that the access platform is below the applicable zone 191,
192.
(5) Make sure that the applicable access panels have been removed:
(a) FOR 6012CM
panels 521AB, 521CB and 521BB, 191BT
R
R
R
R

(b) FOR 6062CM


panels 621AB, 621CB and 621BB, 192BT
(Ref. TASK 57-41-37-000-004), (Ref. TASK 57-41-37-000-005) and
(Ref. TASK 53-35-11-000-001).
Subtask 27-84-45-865-068
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-072
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-054
B. Installation of the Torque Shaft 6012CM(6062CM)
(1) Put the retaining ring (34) in position over the shaft (29).
(2) Install the universal joint (35) and attach it with the pin (33) and
the retaining ring (34).



EFF :
ALL
 27-84-45



AIJ




Page 442
May 01/10

(3) Install the universal joint (28) so that it is against the shoulder
of the gear box.
(4) Attach the shaft (29) to the universal joint (28) with the bolts (39)
and the nuts (38).
(5) Install the shaft (30) and attach it to the shaft (29) with the bolts
(37) and the nuts (36).
Subtask 27-84-45-220-053
C. Dimensional Checks
(1) Measure the dimension between the flanges of the shaft (30) and the
universal joint (35):
(a) If the dimension is less than 6.5 mm (0.2559 in.) or more than
23.5 mm (0.9251 in.), tell the Design Authority.
(b) If the dimension is between 6.6 mm (0.2598 in.) and 13.25 mm
(0.5216 in.), do not install a spacer.
(c) If the dimension is between 13.26 mm (0.5220 in.) and 16.75 mm
(0.6594 in.), install a spacer 3.5 mm (0.1377 in.) thick between
the flanges of the shaft (30) and the universal joint (35).
(d) If the dimension is between 16.76 mm (0.6598 in.) and 23.5 mm
(0.9251 in.), remove the nuts (36), the bolts (37) and the shaft
(30).
(e) Install two spacers, each one 3.5 mm (0.1377 in.) thick:
- one between the flanges of the shaft (30) and the universal
joint (35)
- one between the flanges of the shaft (29) and the shaft (30).
Subtask 27-84-45-420-073
D. Continue with the Installation Procedure
(1) Install the shaft (30) and attach it to the shaft (29) with the bolts
(37) and the nuts (36).
(2) Attach the shaft (30) to the universal joint (35) with the bolts (31)
and the nuts (32).
(3) TORQUE the nuts (32), (36) and (38) to between 1.02 and 1.24 m.daN
(90.26 and 109.73 lbf.in).



EFF :
ALL
 27-84-45


R 
AIJ




Page 443
Nov 01/09

(4) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (32), (36) and (38)
bolts (31), (37) and (39)
flanges of the universal joints (28) and (35)
flanges of the shafts (29) and (30).

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the removed component.
Subtask 27-84-45-210-061
E. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-069
F. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-710-053
G. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.



EFF :
ALL
 27-84-45


R 
AIJ




Page 444
Nov 01/09

5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-070
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-053
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) FOR 6012CM
install 521AB, 521BB, 521CB and 191BT
R
R
R
R

(b) FOR 6062CM


install 621AB, 621BB, 621CB and 192BT
(Ref. TASK 57-41-37-400-002), (Ref. TASK 57-41-37-400-005) and
(Ref. TASK 53-35-11-400-001).
Subtask 27-84-45-865-071
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-942-054
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).



EFF :
ALL
 27-84-45



AIJ




Page 445
May 01/10

(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 446
May 01/10

TASK 27-84-45-000-006
Removal of the Torque Shafts 6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6094CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 4M (13 FT)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-84-45



AIJ




Page 447
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
R
R
R
R
R
R
R

27-80-00-866-005
57-41-37-000-004
57-41-37-000-006

27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the Access Panels 522FB(622FB),
522JB(622JB), 522KB(622KB), 522LB(622LB),
522NB(622NB), 522QB(622QB), 522SB(622SB),
522UB(622UB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-069
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-45



AIJ




Page 448
May 01/10

Subtask 27-84-45-865-054
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-054
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the applicable
access panel.
(2) Remove the applicable access panel(s):
(a) FOR 6014CM
remove 521CB, 521EB
(b) FOR 6028CM
remove 522AB, 522CB
(c) FOR 6036CM
remove 522LB, 522NB
(d) FOR 6038CM
remove 522NB, 522QB
(e) FOR 6040CM
remove 522QB, 522SB
(f) FOR 6042CM
remove 522SB
(g) FOR 6044CM
remove 522UB
(h) FOR 6064CM
remove 621CB, 621EB
(i) FOR 6078CM
remove 622AB, 622CB



EFF :
ALL
 27-84-45



AIJ




Page 449
May 01/10

(j) FOR 6086CM


remove 622LB, 622NB
(k) FOR 6088CM
remove 622NB, 622QB
(l) FOR 6090CM
remove 622QB, 622SB
(m) FOR 6092CM
remove 622SB
R
R
R

(n) FOR 6094CM


remove 622UB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-006) .
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-055
A. Removal of the Torque Shafts
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(2) Remove the nuts (2), the bolts (4) and the shaft (3).
(3) Remove the universal joint (1).
(4) Remove the retaining ring (6), the pin (7) and the universal joint
(5).



EFF :
ALL
 27-84-45



AIJ




Page 450
May 01/10

TASK 27-84-45-400-007
Installation of the Torque Shafts 6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044C M(6094CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 451
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003

R
R
R
R
R
R
R
R
R
R
R
R
R
R

27-80-00-866-005
27-84-00-710-001
57-41-37-000-004
57-41-37-000-006

57-41-37-400-002
57-41-37-400-006

27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the Access Panels 522FB(622FB),
522JB(622JB), 522KB(622KB), 522LB(622LB),
522NB(622NB), 522QB(622QB), 522SB(622SB),
522UB(622UB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the Access Panels 522FB(622FB),
522JB(622JB), 522KB(622KB), 522LB(622LB),
522NB(622NB), 522QB(622QB), 522SB(622SB),
522UB(622UB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-063
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.



EFF :
ALL
 27-84-45



AIJ




Page 452
May 01/10

Subtask 27-84-45-860-056
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of of the applicable component
- on the torque shaft, outboard of the applicable component.
(4) Make sure that the adjustable access platform is in position below
the applicable access panel.
(5) Make sure that the applicable access panels have been removed:
(a) FOR 6014CM
panels 521CB, 521EB
(b) FOR 6028CM
panels 522AB, 522CB
(c) FOR 6036CM
panels 522LB, 522NB
(d) FOR 6038CM
panels 522NB, 522QB
(e) FOR 6040CM
panels 522QB, 522SB
(f) FOR 6042CM
panel 522SB
(g) FOR 6044CM
panels 522UB
(h) FOR 6064CM
panels 621CB, 621EB
(i) FOR 6078CM
panels 622AB, 622CB



EFF :
ALL
 27-84-45


R 
AIJ




Page 453
May 01/10

(j) FOR 6086CM


panels 622LB, 622NB
(k) FOR 6088CM
panels 622NB, 622QB
(l) FOR 6090CM
panels 622QB, 622SB
(m) FOR 6092CM
panel 622SB
R
R
R

(n) FOR 6094CM


panel 622UB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-006).
Subtask 27-84-45-865-072
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-074
A. Preparation for Installation
(1) Clean the component interfaces and/or the adjacent areas with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45



AIJ




Page 454
May 01/10

Subtask 27-84-45-420-075
B. Installation of the Torque Shafts
(1) Put the retaining ring (6) in position over the shaft (3).
(2) Install the universal joint (5) and attach it with the pin (7) and
the retaining ring (6).
(3) Install the universal joint (1).
(4) Install the shaft (3) and attach it with the bolts (4) and the nuts
(2).
(5) TORQUE the nuts (2) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(6) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (2)
bolts (4)
flanges of the universal joints (1) and (5)
flanges of the shaft (3).

(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00400-003):
- from torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the applicable component.
Subtask 27-84-45-210-064
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-073
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 455
May 01/10

Subtask 27-84-45-710-054
E. Test
CAUTION : MAKE SURE THE POWER TRANSMISSION SYSTEM IS COMPLETE BEFORE YOU
_______
DO A PREPARATION FOR TEST OR A TEST.
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-074
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-054
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel(s):
(a) FOR 6014CM
install 521CB, 521EB
(b) FOR 6028CM
install 522AB, 522CB
(c) FOR 6036CM
install 522LB, 522NB
(d) FOR 6038CM
install 522NB, 522QB



EFF :
ALL
 27-84-45


R 
AIJ




Page 456
May 01/10

(e) FOR 6040CM


install 522QB, 522SB
(f) FOR 6042CM
install 522SB
(g) FOR 6044CM
install 522UB
(h) FOR 6064CM
install 621CB, 621EB
(i) FOR 6078CM
install 622AB, 622CB
(j) FOR 6086CM
install 622LB, 622NB
(k) FOR 6088CM
install 622NB, 622QB
(l) FOR 6090CM
install 622QB, 622SB
(m) FOR 6092CM
install 622SB
R
R
R

(n) FOR 6094CM


install 622UB
(Ref. TASK 57-41-37-400-002) and (Ref. TASK 57-41-37-400-006).
Subtask 27-84-45-865-075
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-942-055
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).



EFF :
ALL
 27-84-45



AIJ




Page 457
May 01/10

(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 458
May 01/10

TASK 27-84-45-000-007
Removal of the Torque Shafts 6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER



EFF :
ALL
 27-84-45



AIJ




Page 459
May 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
R
R
R

27-80-00-866-005
57-41-37-000-004
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-070
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-055
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45



AIJ




Page 460
May 01/10

Subtask 27-84-45-010-055
D. Get Access
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the
applicable access panel.
(2) Remove the applicable access panel:
(a) FOR 6016CM
remove 521EB
(b) FOR 6020CM
remove 521EB
(c) FOR 6026CM
remove 522AB
(d) FOR 6030CM
remove 522CB
(e) FOR 6066CM
remove 621EB
(f) FOR 6070CM
remove 621EB
(g) FOR 6076CM
remove 622AB

R
R
R

(h) FOR 6080CM


remove 622CB
(Ref. TASK 57-41-37-000-004).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-056
A. Removal of the Torque Shafts
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-45



AIJ




Page 461
May 01/10

(2) Remove the nuts (10), the bolts (11) and then the shaft (9).
(3) Remove the universal joint (8).



EFF :
ALL
 27-84-45


R 
AIJ




Page 462
May 01/10

TASK 27-84-45-400-008
Installation of the Torque Shafts 6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 463
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003

R
R
R
R
R
R

27-80-00-866-005
27-84-00-710-001
57-41-37-000-004
57-41-37-400-002
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-064
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-057
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.



R
EFF :
ALL
 27-84-45



AIJ




Page 464
May 01/10

(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable components
- on the torque shaft, outboard of the applicable components.
(4) Make sure that the adjustable access platform is in position below
the applicable access panel.
(5) Make sure that the applicable access panel has been removed:
(a) FOR 6016CM
panel 521EB
(b) FOR 6020CM
panel 521EB
(c) FOR 6026CM
panel 522AB
(d) FOR 6030CM
panel 522CB
(e) FOR 6066CM
panel 621EB
(f) FOR 6070CM
panel 621EB
(g) FOR 6076CM
panel 622AB
R
R
R

(h) FOR 6080CM


panel 622CB
(Ref. TASK 57-41-37-000-004).
Subtask 27-84-45-865-076
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45



AIJ




Page 465
May 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-076
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-077
B. Installation of the Torque Shafts
(1) Install the universal joint (8).
(2) Install the shaft (9) and attach it with the bolts (11) and the nuts
(10).
(3) TORQUE the nuts (10) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Apply
- the
- the
- the
- the

STORAGE PRESERVATION (Material No. 15-007) to:


nuts (10)
bolts (11)
flange of the universal joint (8)
flanges of the shaft (9).

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the applicable component.



EFF :
ALL
 27-84-45


R 
AIJ




Page 466
May 01/10

Subtask 27-84-45-210-067
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-077
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-710-055
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-078
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45


R 
AIJ




Page 467
May 01/10

Subtask 27-84-45-410-055
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
(a) FOR 6016CM
install 521EB
(b) FOR 6020CM
install 521EB
(c) FOR 6026CM
install 522AB
(d) FOR 6030CM
install 522CB
(e) FOR 6066CM
install 621EB
(f) FOR 6070CM
install 621EB
(g) FOR 6076CM
install 622AB
R
R
R

(h) FOR 6080CM


install 622CB
(Ref. TASK 57-41-37-400-002).
Subtask 27-84-45-865-079
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-942-056
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).



EFF :
ALL
 27-84-45



AIJ




Page 468
May 01/10

(3) Remove the access platform(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 469
May 01/10

TASK 27-84-45-000-008
Removal of the Torque Shaft 6018CM(6068CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 ACCESS PLATFORM 3M (10 FT)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-44-000-002
R
R
R

57-41-37-000-004

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearings FIN
6017CM(6067CM)/6019CM(6069CM)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)



EFF :
ALL
 27-84-45



AIJ




Page 470
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

57-41-37-000-010
27-84-45-991-001
27-84-45-991-003

Removal of the Access Panel 521GB(621GB)


Fig. 401
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001, 403/TASK 27-84-45-991-003)
Subtask 27-84-45-941-070
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-071
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-099
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45



AIJ




Page 471
May 01/10

Subtask 27-84-45-010-061
D. Get Access
R
R

(1) Put the ACCESS PLATFORM 3M (10 FT) in position below the applicable
access panels 521EB, 621EB.

R
R
R
R

(2) Remove the applicable access panels:


- for 6016CM(6066CM), remove 521EB, 621EB (Ref. TASK 57-41-37-000004)
- for 6020CM(6070CM), remove 521GB, 621GB (Ref. TASK 57-41-37-000010) .
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-063
A. Preparation for Removal
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(2) Remove the applicable steady bearing (44) (Ref. TASK 27-84-44-000002):
(a) FOR 6018CM
remove the steady bearing 6017CM
(b) FOR 6068CM
remove the steady bearing 6067CM.
Subtask 27-84-45-020-057
B. Removal of the Torque Shafts 6018CM(6068CM)
(1) Hold the steady bearing (46) and remove the shaft (45).
(2) Remove the applicable steady bearing:
(a) FOR 6018CM
remove 6019CM



EFF :
ALL
 27-84-45



AIJ




Page 472
May 01/10

(b) FOR 6068CM


remove 6069CM.



EFF :
ALL
 27-84-45


R 
AIJ




Page 473
May 01/10

TASK 27-84-45-400-009
Installation of the Torque Shaft 6018CM(6068CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27504030001

safety barriers
warning notice
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 474
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-80-00-866-005
27-84-44-000-002
27-84-44-400-002
R
R
R
R
R
R
R
R

57-41-37-000-004
57-41-37-000-010
57-41-37-400-002
57-41-37-400-010
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearings FIN
6017CM(6067CM)/6019CM(6069CM)
Installation of the Steady Bearings FIN
6017CM(6067CM)/6019CM(6069CM)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the Access Panel 521GB(621GB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the Access Panel 521GB(621GB)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-065
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.



EFF :
ALL
 27-84-45



AIJ




Page 475
May 01/10

Subtask 27-84-45-860-058
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is attached
to the flap/slat control lever on panel 114VU.
(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable component
- on the torque shaft, outboard of the applicable component.
(4) Make sure that the aircraft is in the same configuration as at the
end of the removal task.
(5) Make sure that the access platform is in position below the
applicable access panel 521EB(621EB).
(6) Make sure that the applicable access panels have been removed:
- for 6016CM(6066CM), panels 521EB, 621EB (Ref. TASK 57-41-37-000004)
- for 6020CM(6070CM), panels 521GB, 621GB (Ref. TASK 57-41-37-000010).

R
R
R
R

(7) Make sure that the applicable steady bearing has been removed
(Ref. TASK 27-84-44-000-002).
Subtask 27-84-45-865-080
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45



AIJ




Page 476
May 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-078
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-058
B. Installation of the Torque Shafts
(1) Install the shaft (45) in the steady bearing (46) and install the
applicable steady bearing (46) (Ref. TASK 27-84-44-400-002):
(a) FOR 6018CM
install the steady bearing 6017CM
(b) FOR 6068CM
install the steady bearing 6067CM.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the applicable component.
Subtask 27-84-45-865-100
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 477
May 01/10

Subtask 27-84-45-710-059
D. Test
(1) The operational test of the slat power-transmission system is
contained in the installation of the steady bearing (Ref. TASK 27-8444-000-002).
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-410-061
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the access panels:
- for 6016CM, install 521EB, 621EB (Ref. TASK 57-41-37-400-002)
- for 6020CM, install 521GB, 621GB and (Ref. TASK 57-41-37-400-010).

R
R

Subtask 27-84-45-942-057
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45



AIJ




Page 478
May 01/10

TASK 27-84-45-000-009
Removal of the Torque Shaft 6022CM(6072CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-84-44-000-003
27-84-45-991-001
27-84-45-991-003

Extending the Slats on the Ground


Removal of the Steady Bearing FIN 6021CM(6071CM)
Fig. 401
Fig. 403



EFF :
ALL
 27-84-45


R 
AIJ




Page 479
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001, 403/TASK 27-84-45-991-003)
Subtask 27-84-45-941-076
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice(s) in position to tell persons not to operate
the slat controls.
Subtask 27-84-45-865-101
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-860-050
C. Aircraft Maintenance Configuration
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the slat/flap control lever.
(3) Remove the applicable steady bearing (43) (Ref. TASK 27-84-44-000003):
(a) FOR 6022CM
remove the steady bearing FIN 6021CM
(b) FOR 6072CM
remove the steady bearing FIN 6071CM.



EFF :
ALL
 27-84-45


R 
AIJ




Page 480
May 01/10

Subtask 27-84-45-010-056
D. Get Access
(1) Put an access platform in position below the applicable access panel
521AT (621AT).
(2) Remove the applicable access panel:
(a) FOR 6022CM
remove 521AT
(b) FOR 6072CM
remove 621AT.
4. Procedure
_________
(Ref. Fig. 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-058
A. Removal of the Torque Shafts 6022CM(6072CM)
(1) Remove the nuts (40), the bolts (41) and the shaft (42).



EFF :
ALL
 27-84-45


R 
AIJ




Page 481
May 01/10

TASK 27-84-45-400-010
Installation of the Torque Shaft 6022CM(6072CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



R
EFF :
ALL
 27-84-45



AIJ




Page 482
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-004
27-80-00-866-005
27-84-00-710-001
27-84-44-000-003
27-84-44-400-003
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extending the Slats on the Ground
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Steady Bearing FIN 6021CM(6071CM)
Installation of the Steady Bearing FIN 6021CM(6071CM)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-066
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-059
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
to the flap/slat control lever.
(3) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft inboard of the applicable component
- on the torque shaft outboard of the applicable component.
(4) Make sure that the access platform is in position below the
applicable access panel 521AT(621AT).



EFF :
ALL
 27-84-45


R 
AIJ




Page 483
May 01/10

(5) Make sure that the applicable access panels 521AT(621AT) are removed.
(6) Make sure that the applicable steady bearings have been removed
(Ref. TASK 27-84-44-000-003).
Subtask 27-84-45-865-081
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-079
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-080
B. Installation of the Torque Shaft 6022CM(6072CM)
(1) Install the shaft (42) and attach it with the bolts (41) and the nuts
(40).
(2) TORQUE the nuts (40) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).



EFF :
ALL
 27-84-45


R 
AIJ




Page 484
May 01/10

(3) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (40)
bolts (41)
flange of the shaft (42).

(4) Install the applicable steady bearing (43) (Ref. TASK 27-84-44-400003):
(a) FOR 6022CM
install the steady bearing 6021CM
(b) FOR 6072CM
install the steady bearing 6071CM.
(5) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-710-060
C. Test
(1) The an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001) is contained in the installation of the
steady bearing (Ref. TASK 27-84-44-000-003).
5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-866-052
A. Extend the Flaps
(1) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).
Subtask 27-84-45-865-082
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45


R 
AIJ




Page 485
May 01/10

Subtask 27-84-45-410-056
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
(a) FOR 6022CM
install 521AT
(b) FOR 6072CM
install 621AT.
Subtask 27-84-45-865-083
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-866-053
E. Retract the Slats
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-45-942-058
F. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 486
May 01/10

TASK 27-84-45-000-010
Removal of the Torque Shaft 6024CM(6074CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
access platform 3.5 m (11 ft. 6 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-004
57-41-37-000-003
57-41-37-000-004
27-84-45-991-001

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Extending the Slats on the Ground
Removal of the Access Panel 522AT(622AT)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Fig. 401



EFF :
ALL
 27-84-45


R 
AIJ




Page 487
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-45-991-003

Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-45-860-072
B. Aircraft Maintenance Configuration
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-056
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45


R 
AIJ




Page 488
May 01/10

Subtask 27-84-45-010-057
D. Get Access
(1) Put the access platform in position below the zone 522(622).
(2) Remove the applicable access panels (Ref. TASK 57-41-37-000-003),
(Ref. TASK 57-41-37-000-004):
(a) FOR 6024CM
remove 522AT, 522AB, 521HB
(b) FOR 6074CM
remove 622AT, 622AB, 621HB.
4. Procedure
_________
(Ref. Fig. 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-059
A. Removal of the Torque Shafts 6024CM (6074CM)
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable components
- on the torque shaft, outboard of the applicable components.
(2) Remove the nuts (51), the bolts (52) and the shaft (49).
(3) Remove the shafts (48) and (50).



EFF :
ALL
 27-84-45


R 
AIJ




Page 489
May 01/10

TASK 27-84-45-400-011
Installation of the Torque Shaft 6024CM(6074CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 490
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-80-00-866-004
27-80-00-866-005
27-84-00-710-001
57-41-37-000-003
57-41-37-000-004
57-41-37-400-002
57-41-37-400-003
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Extending the Slats on the Ground
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Access Panel 522AT(622AT)
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the Access Panel 522AT(622AT)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-067
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-060
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-45


R 
AIJ




Page 491
May 01/10

(3) Make sure that the access platform is in position below the
applicable zone 522(622).
(4) Make sure that the applicable access panels have been removed
(Ref. TASK 57-41-37-000-003), (Ref. TASK 57-41-37-000-004):
(a) FOR 6024CM
panels 522AT, 522AB, 521HB
(b) FOR 6074CM
panels 622AT, 622AB, 621HB.
(5) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the removed component
- on the torque shaft, outboard of the removed component.
Subtask 27-84-45-865-084
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-081
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.



EFF :
ALL
 27-84-45


R 
AIJ




Page 492
May 01/10

Subtask 27-84-45-420-082
B. Installation of the Torque Shaft 6024CM(6074CM)
(1) Install the shafts (48) and (50).
(2) Install the shaft (49) and attach it with the bolts (52) and the nuts
(51).
(3) TORQUE the nuts (51) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(4) Apply
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (51)
bolts (52)
flanges of the shafts (48), (49) and (50).

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable component
- from the torque shaft, outboard of the applicable component.
Subtask 27-84-45-220-057
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-085
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-710-056
E. Test
(1) Do an operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.



EFF :
ALL
 27-84-45


R 
AIJ




Page 493
May 01/10

5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-866-054
A. Extend the Slats
(1) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866004).
Subtask 27-84-45-865-086
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-057
C. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels (Ref. TASK 57-41-37-400-003),
(Ref. TASK 57-41-37-400-002):
(a) FOR 6024CM
install 522AT, 522AB, 521HB
(b) FOR 6074CM
install 622AT, 622AB, 621HB.
Subtask 27-84-45-865-087
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-45


R 
AIJ




Page 494
May 01/10

Subtask 27-84-45-866-055
E. Retract the Slats
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-45-942-059
F. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page 495
May 01/10

TASK 27-84-45-000-011
Removal of the Torque Shaft 6032CM(6082CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-44-000-006
27-84-45-991-001
27-84-45-991-002

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearing FIN 6031CM(6081CM)
Fig. 401
Fig. 402



EFF :
ALL
 27-84-45


R 
AIJ




Page 496
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-074
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in position to tell persons not to operate
the slat controls.
Subtask 27-84-45-860-073
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-102
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-058
D. Get Access
(1) Put the access platform in position below the applicable access panel
522FB(622FB).
(2) Remove the applicable steady bearing (15) (Ref. TASK 27-84-44-000006):
(a) FOR 6032CM
remove the steady bearing FIN 6031CM
(b) FOR 6082CM
remove the steady bearing FIN 6081CM.



EFF :
ALL
 27-84-45


R 
AIJ




Page 497
May 01/10

(3) Remove the applicable access panel:


(a) FOR 6032CM
remove 522FB
(b) FOR 6082CM
remove 622FB.
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-020-060
A. Removal of the Torque Shafts 6032CM(6082CM)
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable components
- on the torque shaft, outboard of the applicable components.
(2) Remove the nuts (16), the bolts (17) and the shaft (14).
(3) Remove the retaining ring (18), the pin (12) and the universal joint
(13).



EFF :
ALL
 27-84-45


R 
AIJ




Page 498
May 01/10

TASK 27-84-45-400-012
Installation of the Torque Shaft 6032CM(6082CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

FOR FIN 6082CM


98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page 499
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-44-000-006
27-84-44-400-004
27-84-44-400-006
27-84-45-991-001
27-84-45-991-002
FOR FIN 6082CM
27-50-00-000-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Steady Bearing FIN 6031CM(6081CM)
Installation of the Steady Bearing FIN 6023CM(6073CM)
Installation of the Steady Bearing FIN 6031CM(6081CM)
Fig. 401
Fig. 402
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-068
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-061
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable access panel 522FB(622FB).
(2) Make sure that the applicable access panel 522FB(622FB) is removed.
(3) Make sure that the applicable steady bearing has been removed
(Ref. TASK 27-84-44-000-006).
(4) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).



EFF :
ALL
 27-84-45


R 
AIJ




Page A400
May 01/10

(5) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(6) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the removed component
- on the torque shaft, outboard of the removed component.
Subtask 27-84-45-865-088
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-083
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-084
B. Installation of the Torque Shaft 6032CM(6082CM)
(1) Put the retaining ring (18) in position over the shaft (14).
(2) Install the universal joint (13) and attach it with the pin (12) and
the retaining ring (18).



EFF :
ALL
 27-84-45


R 
AIJ




Page A401
May 01/10

(3) Install the shaft (14) and attach it with the bolts (17) and the nuts
(16).
(4) TORQUE the nuts (16) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(5) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (16)
bolts (17)
flange of the universal joint (13)
flange of the shaft (14).

(6) Install the applicable steady bearing (15) (Ref. TASK 27-84-44-400006):
(a) FOR 6032CM
install the steady bearing 6031CM
(b) FOR 6082CM
install the steady bearing 6081CM.
(7) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
(8) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the applicable components
- from the torque shaft, outboard of the applicable components.
Subtask 27-84-45-865-103
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-710-061
D. Test
(1) The operational test of the slat power transmission system is
contained in the installation of the steady bearing (Ref. TASK 27-8444-400-004).



EFF :
ALL
 27-84-45


R 
AIJ




Page A402
May 01/10

5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-089
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-058
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel:
(a) FOR 6032CM
install 522FB
(b) FOR 6082CM
install 622FB.
Subtask 27-84-45-865-090
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-942-060
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page A403
May 01/10

TASK 27-84-45-000-012
Removal of the Torque Shaft 6034CM(6084CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.6 m (11 ft. 10 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-866-005
27-84-45-991-001
27-84-45-991-003

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Retracting the Slats on the Ground
Fig. 401
Fig. 403



EFF :
ALL
 27-84-45


R 
AIJ




Page A404
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-057
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in position to tell persons not to operate
the slat controls.
Subtask 27-84-45-860-074
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-057
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-059
D. Get Access
(1) Put the access platform in position below the applicable access
panel:
(2) Remove the applicable access panels:
(a) FOR 6034CM
remove 522FB, 522HB, 522JB, 522KB
(b) FOR 6084CM
remove 622FB, 622HB, 622JB, 622KB.



EFF :
ALL
 27-84-45


R 
AIJ




Page A405
May 01/10

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-061
A. Removal of the Torque Shafts 6034CM(6084CM)
(1) Install a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the applicable components
- on the torque shaft, outboard of the applicable components.
(2) Remove the nuts (36) and (38), the bolts (37) and (39) and the shaft
(29).
(3) Remove the nuts (32), the bolts (31) and then the shaft (30).
(4) Remove the universal joint (28).
(5) Remove the retaining ring (34), the pin (33) and the universal joint
(35).



EFF :
ALL
 27-84-45


R 
AIJ




Page A406
May 01/10

TASK 27-84-45-400-013
Installation of the Torque Shaft 6034CM(6084CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

98D27504030001

circuit breaker(s) safety clip(s)


safety barriers
warning notice
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page A407
May 01/10

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-000-003
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
27-84-45-991-001
27-84-45-991-002

Removal of the Lock-Torque Shaft - Flaps and Slats


(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-069
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-062
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable access panel.
(2) Make sure that the applicable access panels have been removed:
(a) FOR 6034CM
panels 522FB, 522HB, 522JB, 522KB
(b) FOR 6084CM
panels 622FB, 622HB, 622JB, 622KB.
(3) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).



EFF :
ALL
 27-84-45


R 
AIJ




Page A408
May 01/10

(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(5) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003):
- on the torque shaft, inboard of the removed component
- on the torque shaft, outboard of the removed component.
Subtask 27-84-45-865-091
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-085
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-086
B. Installation of the Torque Shaft 6034CM(6084CM)
(1) Install the universal joint (28).
(2) Install the universal joint (35) and attach it with the pin (33) and
the retaining ring (34).



EFF :
ALL
 27-84-45


R 
AIJ




Page A409
May 01/10

(3) Install the shaft (29) and attach it with the bolts (39) and the nuts
(38).
(4) Install the shaft (30) and attach it with the bolts (31) and (37) and
the nuts (32) and (36).
(5) TORQUE the nuts (32), (36) and (38) to between 1.02 and 1.24 m.daN
(90.26 and 109.73 lbf.in).
(6) Apply
- the
- the
- the
- the

a layer of STORAGE PRESERVATION (Material No. 15-007) to:


nuts (32), (36) and (38)
bolts (31), (37) and (39)
flanges of the universal joints (28) and (35)
flanges of the shafts (29) and (30).

(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003):
- from the torque shaft, inboard of the removed components
- from the torque shaft, outboard of the removed components.
Subtask 27-84-45-210-076
C. Dimensional/Visual Checks
(Ref. Fig. 402/TASK 27-84-45-991-002)
(1) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-865-092
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-710-057
E. Test
(1) Do an operational test of the slat power transmission system
(Ref. TASK 27-84-00-710-001). Make sure that the rotation of the
torque shafts does not cause damage.



R
EFF :
ALL
 27-84-45



AIJ




Page A410
May 01/10

5. Close-up
________
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-865-093
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-410-059
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panels:
(a) FOR 6034CM
install 522FB, 522HB, 522JB, 522KB
(b) FOR 6084CM
install 622FB, 622HB, 622JB, 622KB.
Subtask 27-84-45-865-094
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-45-942-061
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45


R 
AIJ




Page A411
May 01/10

TASK 27-84-45-000-013
Removal of the Torque Shaft 6046CM(6096CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-81-42-000-001
27-84-45-991-001
27-84-45-991-003

Retracting the Slats on the Ground


Removal of the PPU Adaptor Plate 6048CM(6098CM)
Fig. 401
Fig. 403



EFF :
ALL
 27-84-45


R 
AIJ




Page A412
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-075
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in position to tell persons not to operate
the slat controls.
Subtask 27-84-45-860-075
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-104
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-45-010-062
D. Get Access
(1) Put the access platform in position below the applicable zone 522
(622).
(2) Remove the PPU adaptor plate (Ref. TASK 27-81-42-000-001).



EFF :
ALL
 27-84-45


R 
AIJ




Page A413
May 01/10

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-45-991-001, 403/TASK 27-84-45-991-003)
Subtask 27-84-45-020-062
A. Removal of the Torque Shaft 6046CM (6096CM)
(1) Remove the shaft (47).



EFF :
ALL
 27-84-45


R 
AIJ




Page A414
May 01/10

TASK 27-84-45-400-014
Installation of the Torque Shaft 6046CM(6096CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
Material No. 11-026
Material No. 19-003

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-45


R 
AIJ




Page A415
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-81-42-000-001
27-81-42-400-001
27-84-45-991-001
27-84-45-991-002

Removal of the PPU Adaptor Plate 6048CM(6098CM)


Installation of the PPU Adaptor Plate 6048CM(6098CM)
Fig. 401
Fig. 402

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-45-991-001)
Subtask 27-84-45-941-077
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-45-860-063
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position below the
applicable zone 522(622).
(2) Make sure that the adapter plate of the PPU has been removed
(Ref. TASK 27-81-42-000-001).
Subtask 27-84-45-865-095
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-45



AIJ




Page A416
May 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-45-991-002)
Subtask 27-84-45-420-087
A. Preparation for Installation
(1) Clean the component interface and /or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
torque shaft splines.
Subtask 27-84-45-420-063
B. Installation of the Torque Shaft 6046CM(6069CM)
(1) Install the shaft (47).
(2) Install the PPU adaptor plate (Ref. TASK 27-81-42-400-001).
(3) Make sure that:
- you cannot see the spline engagement groove at the movable joint
- the dimension A is a minimum of 6.5 mm (0.2559 in.) at the movable
joint.
Subtask 27-84-45-710-062
C. Test
(1) The operational test of the slat power-transmission system is
contained in the installation of the PPU adaptor plate (Ref. TASK 2781-42-400-001).
5. Close-up
________
Subtask 27-84-45-865-096
A. Make sure that this(these) circuit breaker(s) is(are) closed:
5CV, 7CV.



EFF :
ALL
 27-84-45



AIJ




Page A417
May 01/10

Subtask 27-84-45-942-062
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-45



AIJ




Page A418
May 01/10

ACTUATOR ASSY - TYPE A (6013CM,6015CM,6063CM,6065CM) - REMOVAL/INSTALLATION


___________________________________________________________________________
TASK 27-84-48-000-001
Removal of the Type A Actuators 6013CM(6063CM)/6015CM(6065CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001
98D27804006000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
adjustable access platform 3.6 m (11 ft. 10 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
2 TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3)



EFF :
ALL
 27-84-48



AIJ




Page 401
Nov 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-45-000-005
27-84-45-000-006

27-84-45-000-007
27-84-48-400-001
31-32-00-860-006
R

27-84-48-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Torque Shaft 6012CM(6062CM)
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-48-991-001)


Subtask 27-84-48-941-051
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-48-860-051
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.



EFF :
ALL
 27-84-48



AIJ




Page 402
Feb 01/07

R
R

Type A Actuators - Slat Power Transmission


Figure 401/TASK 27-84-48-991-001



EFF :
ALL
 27-84-48



AIJ




Page 403
Feb 01/07

(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).


(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
Subtask 27-84-48-740-050
C. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC
1.

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button.

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>.

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU.

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.



EFF :
ALL
 27-84-48


R 
AIJ




Page 404
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-8448-400-001).
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
Subtask 27-84-48-865-051
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-48-010-050
E. Get Access
(1) Put an adjustable access platform below the applicable torque shaft.
(2) Remove the applicable torque shaft (1):
(a) (Ref. TASK 27-84-45-000-005)
- FOR 6013CM
remove the torque shaft FIN 6012CM
- FOR 6063CM
remove the torque shaft FIN 6062CM.



EFF :
ALL
 27-84-48


R 
AIJ




Page 405
Feb 01/07

(b) (Ref. TASK 27-84-45-000-007)


- FOR 6015CM
remove the torque shaft FIN 6016CM
- FOR 6065CM
remove the torque shaft FIN 6066CM.
(3) Remove the applicable torque shaft (3) (Ref. TASK 27-84-45-000-006):
- FOR 6013CM
remove the torque shaft FIN 6014CM
- FOR 6015CM
remove the torque shaft FIN 6014CM
- FOR 6063CM
remove the torque shaft FIN 6064CM
- FOR 6065CM
remove the torque shaft FIN 6064CM.
R

(4) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
is installed (Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft ouboard of the removed component.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-48-991-001)
Subtask 27-84-48-020-050
A. Removal of the Type A Actuator
(1) Hold the actuator (2) and remove the bolts (4) and the washers (5).
Remove the actuator (2).
(2) If you remove the two actuators (2) from the slat, install a TOOLALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3) (98D27804006000) in each
pinion after each actuator (2) is removed. This will prevent movement
of the slat.



EFF :
ALL
 27-84-48



AIJ




Page 406
Nov 01/08

TASK 27-84-48-400-001
Installation of the Type A Actuators 6013CM(6063CM)/6015CM(6065CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27804012000

safety barriers
warning notice(s)
1 GAGE-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-48



AIJ




Page 407
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
27-84-45-000-005
27-84-45-000-006

27-84-45-000-007
27-84-45-400-006
27-84-45-400-007

27-84-45-400-008
27-84-48-000-001
27-84-48-400-001
31-32-00-860-006
27-84-48-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shaft 6012CM(6062CM)
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Installation of the Torque Shaft 6012CM(6062CM)
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)
/6044CM(6094CM)
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401



EFF :
ALL
 27-84-48


R 
AIJ




Page 408
Nov 01/08

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-48-991-001)


Subtask 27-84-48-941-052
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) is in the cockpit to tell
persons not to operate the slat controls.
Subtask 27-84-48-860-050
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the applicable torque shaft (1) has been removed:
(a) (Ref. TASK 27-84-45-000-005)
FOR 6013CM
- the torque shaft 6012CM
FOR 6063CM
- the torque shaft 6062CM.
(b) (Ref. TASK 27-84-45-000-007)
FOR 6015CM
- the torque shaft 6016CM
FOR 6065CM
- the torque shaft 6066CM.
(4) Make sure that the applicable torque shaft (3) (Ref. TASK 27-84-45000-006) has been removed:
FOR 6013CM
- the torque shaft 6014CM
FOR 6015CM
- the torque shaft 6014CM
FOR 6063CM
- the torque shaft 6064CM
FOR 6065CM
- the torque shaft 6064CM.



EFF :
ALL
 27-84-48



AIJ




Page 409
Feb 01/07

(5) If the two actuators (2) have been removed from the slat, make sure
that the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3) is
installed in each pinion.
(6) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
Subtask 27-84-48-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-48-991-001)
NOTE : The slat actuators are vented units filled with grease. It is normal
____
for this grease to have some oil separation. The external surfaces of
the actuators can be moist with this grease as they are not
hermetically sealed units. But separated oil in the units that
touches the grease will be changed back during operation. The oil
separation will decrease during in-service operation until the
lubricant is in a condition that is stable. This is normal and will
not cause damage to the units.
Subtask 27-84-48-420-051
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.

R
R
R

(3) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
actuator output splines.



EFF :
ALL
 27-84-48



AIJ




Page 410
Nov 01/09

(4) If two TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3) are


installed, remove one TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND
3) and install the applicable actuator before you remove the other
TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3).
Subtask 27-84-48-420-052
B. Installation of the Type A Actuators 6013CM(6063CM)/6015CM(6065CM)
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (4).
(2) Install the actuator (2) with the washers (5) and the bolts (4).
(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
washers (5) and the bolts (4).
Subtask 27-84-48-820-051
C. Dimensional Check
(1) To make sure that the track has not moved, put the GAGE-RIGGING
(98D27804012000) between the track stop and the lower forward roller.
(2) Make sure that the GAGE-RIGGING contacts the track stop and the lower
forward roller.
(3) If it is necessary to adjust the slat, turn the actuator drive in the
applicable direction.
Subtask 27-84-48-410-050
D. Close Access
(1) Install the applicable torque shaft (1):
(a) (Ref. TASK 27-84-45-400-006)
FOR 6013CM
- install the torque shaft 6012CM
FOR 6063CM
- install the torque shaft 6062CM.
(b) (Ref. TASK 27-84-45-400-008)
FOR 6015CM
- install the torque shaft 6016CM
FOR 6065CM
- install the torque shaft 6066CM.



EFF :
ALL
 27-84-48


R 
AIJ




Page 411
Nov 01/09

(2) Install the applicable torque shaft (3) (Ref. TASK 27-84-45-400-007):
FOR 6013CM
- install the torque shaft 6014CM
FOR 6015CM
- install the torque shaft 6014CM
FOR 6063CM
- install the torque shaft 6064CM
FOR 6065CM
- install the torque shaft 6064CM.
Subtask 27-84-48-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-48-740-051
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC 1

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).



EFF :
ALL
 27-84-48


R 
AIJ




Page 412
Nov 01/09

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------5. Write down the APPU and the FPPU
angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
Subtask 27-84-48-820-050
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
recorded before the actuator was removed (Ref. TASK 27-84-48-000001). Make sure that:
- at position 0, the APPU/FPPU angles agree by 0.9 deg
- at positions 1,2,3 and FULL, the APPU/FPPU angles agree by 1.3 deg
- the LH APPU and the RH APPU angles agree by 0.45 deg.
(2) If the APPU/FPU angles are not in the specified limit:
(a) Disconnect the torque shaft outboard of the actuator (Ref. TASK
27-84-48-000-001).
(b) Turn the torque shaft in the applicable direction until the APPU
and the FPU angles (deg) are in the specified limit.
NOTE : A turn of the torque shaft by one spline is equal to 0.11
____
deg. of the PPU angle.
(c) Connect the torque shaft outboard of the actuator (Ref. TASK 2784-48-400-001).
Subtask 27-84-48-710-050
H. Test
(1) Do the operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).



EFF :
ALL
 27-84-48


R 
AIJ




Page 413
Nov 01/09

5. Close-up
________
Subtask 27-84-48-942-050
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-48


R 
AIJ




Page 414
Nov 01/09

ACTUATOR ASSY - TYPE B (6027CM,6029CM,6033CM,6035CM,6037CM,6039CM,6041CM,


_________________________________________________________________________
___________________________________________________________________________
6045CM,6077CM,6079CM,6083CM,6085CM,6087CM,6089CM...)
- REMOVAL/INSTALLATION
TASK 27-84-49-000-001
Removal of the Type B Actuators 6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001
98D27804007000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
adjustable access platform 3.6 m (11 ft. 10 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
2 TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12)



EFF :
ALL
 27-84-49



AIJ




Page 401
Nov 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-45-000-006

27-84-45-000-007
27-84-45-000-012
27-84-45-000-013
27-84-48-400-001
31-32-00-860-006
R

27-84-49-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Removal of the Torque Shaft 6034CM(6084CM)
Removal of the Torque Shaft 6046CM(6096CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-49-991-001)


Subtask 27-84-49-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.



EFF :
ALL
 27-84-49



AIJ




Page 402
Feb 01/07

R
R

Type B Actuators - Slat Power Transmission


Figure 401/TASK 27-84-49-991-001



EFF :
ALL
 27-84-49



AIJ




Page 403
Feb 01/07

Subtask 27-84-49-860-050
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the slat/flap control lever on panel 114VU.
Subtask 27-84-49-740-050
C. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC
1.

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button.

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>.

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU.

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.



EFF :
ALL
 27-84-49


R 
AIJ




Page 404
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-8448-400-001).
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
Subtask 27-84-49-865-054
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-49-010-051
E. Get Access
(1) Put an adjustable access platform below the applicable torque shaft.
(2) Remove the applicable torque shaft (3) (Ref. TASK 27-84-45-000-006):
- FOR 6027CM
remove the torque shaft FIN 6028CM
- FOR 6029CM
remove the torque shaft FIN 6028CM
- FOR 6035CM
remove the torque shaft FIN 6036CM
- FOR 6039CM
remove the torque shaft FIN 6038CM
- FOR 6045CM
remove the torque shaft FIN 6044CM



EFF :
ALL
 27-84-49


R 
AIJ




Page 405
Feb 01/07

- FOR 6077CM
remove the
- FOR 6079CM
remove the
- FOR 6085CM
remove the
- FOR 6089CM
remove the
- FOR 6095CM
remove the

torque shaft FIN 6078CM


torque shaft FIN 6078CM
torque shaft FIN 6086CM
torque shaft FIN 6088CM
torque shaft FIN 6094CM.

(3) Remove the applicable torque shaft (6):


(a) (Ref. TASK 27-84-45-000-007)
- FOR 6027CM
remove the torque shaft FIN
- FOR 6029CM
remove the torque shaft FIN
- FOR 6077CM
remove the torque shaft FIN
- FOR 6079CM
remove the torque shaft FIN

6026CM
6030CM
6076CM
6080CM.

(b) (Ref. TASK 27-84-45-000-012)


- FOR 6035CM
remove the torque shaft FIN 6034CM
- FOR 6085CM
remove the torque shaft FIN 6084CM.
(c) (Ref. TASK 27-84-45-000-006)
- FOR 6039CM
remove the torque shaft FIN 6040CM
- FOR 6089CM
remove the torque shaft FIN 6090CM.
(d) (Ref. TASK 27-84-45-000-013)
- FOR 6045CM
remove the torque shaft FIN 6046CM
- FOR 6095CM
remove the torque shaft FIN 6096CM.
R

(4) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
(Ref. TASK 27-50-00-400-003) is installed as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed components.



EFF :
ALL
 27-84-49



AIJ




Page 406
Nov 01/08

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-84-49-991-001)


Subtask 27-84-49-020-050
A. Removal of the Type B Actuators
(1) Hold the actuator (7) and remove the bolts (9) and the washers (8).
Remove the actuator (7).
(2) If you remove both actuators from a slat, install a TOOL-ALIGNMENT
AND LOCKING (SLAT TRACKS 5 TO 12) (98D27804007000) in each pinnion
after each actuator (7) is removed or the slat will extend.



EFF :
ALL
 27-84-49



AIJ




Page 407
Feb 01/07

TASK 27-84-49-400-001
Installation of the Type B Actuators 6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27804012000

safety barriers
warning notice(s)
1 GAGE-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 09-018
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-49



AIJ




Page 408
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
27-84-45-000-006

27-84-45-000-007
27-84-45-000-012
27-84-45-000-013
27-84-45-400-007

27-84-45-400-008
27-84-45-400-013
27-84-45-400-014
27-84-48-000-001
27-84-49-000-001
27-84-49-400-001
31-32-00-860-006
R

27-84-49-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM(6076CM)/
6030CM(6080CM)
Removal of the Torque Shaft 6034CM(6084CM)
Removal of the Torque Shaft 6046CM(6096CM)
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)
/6044CM(6094CM)
Installation of the Torque Shafts
6016CM(6066CM)/6020CM(6070CM)/6026CM
(6076CM)/6030CM(6080CM)
Installation of the Torque Shaft 6034CM(6084CM)
Installation of the Torque Shaft 6046CM(6096CM)
Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Removal of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Installation of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401



EFF :
ALL
 27-84-49



AIJ




Page 409
Feb 01/07

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-49-991-001)


Subtask 27-84-49-941-054
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) are in the cockpit to tell
persons not to operate the slat controls.
Subtask 27-84-49-860-052
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the adjustable access platform is below the applicable
torque shaft.
(4) Make sure that the
27-84-45-000-006):
FOR 6027CM
- the torque shaft
FOR 6029CM
- the torque shaft
FOR 6035CM
- the torque shaft
FOR 6039CM
- the torque shaft
FOR 6045CM
- the torque shaft
FOR 6077CM
- the torque shaft
FOR 6079CM
- the torque shaft
FOR 6085CM
- the torque shaft
FOR 6089CM
- the torque shaft
FOR 6095CM

applicable torque shaft (3) is removed (Ref. TASK


6028CM
6028CM
6036CM
6038CM
6044CM
6078CM
6078CM
6086CM
6088CM



EFF :
ALL
 27-84-49



AIJ




Page 410
Feb 01/07

- the torque shaft 6094CM.


(5) Make sure that the applicable torque shaft (6) is removed:
(a) (Ref. TASK 27-84-45-000-007)
FOR 6027CM
- the torque shaft 6026CM
FOR 6029CM
- the torque shaft 6030CM
FOR 6077CM
- the torque shaft 6076CM
FOR 6079CM
- the torque shaft 6080CM.
(b) (Ref. TASK 27-84-45-000-012)
FOR 6035CM
- the torque shaft 6034CM
FOR 6085CM
- the torque shaft 6084CM.
(c) (Ref. TASK 27-84-45-000-006)
FOR 6039CM
- the torque shaft 6040CM
FOR 6089CM
- the torque shaft 6090CM.
(d) (Ref. TASK 27-84-45-000-013)
FOR 6045CM
- the torque shaft 6046CM
FOR 6095CM
- the torque shaft 6096CM.
(6) If the two actuators (2) have been removed from the slat, make sure
that the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3) is
installed in each pinion.
R

(7) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.



EFF :
ALL
 27-84-49



AIJ




Page 411
Nov 01/08

Subtask 27-84-49-865-050
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-49-991-001)
NOTE : The slat actuators are vented units filled with grease. It is normal
____
for this grease to have some oil separation. The external surfaces of
the slat actuators may be moist with this separated oil as they are
not hermetically sealed units. However, any separated oil in the
units that touches the grease will be changed back during operation.
The oil separation will decrease during in-service operation until
the lubricant is in a condition that is stable. This is normal and
will not cause damage to the units.
Subtask 27-84-49-420-052
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
actuator output splines.
(5) If the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12) are
installed, remove one TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO
12) and install the applicable actuator before you remove the other
TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12).



EFF :
ALL
 27-84-49



AIJ




Page 412
Nov 01/09

Subtask 27-84-49-420-050
B. Installation of the Type B Actuators
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-018) to the shanks of the bolts (9).
(2) Install the actuator (7) and attach it with the washers (8) and the
bolts (9).
(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
washers (8) and the bolts (9).
Subtask 27-84-49-820-051
C. Dimensional Check
(1) To make sure that the track has not moved, put the GAGE-RIGGING
(98D27804012000) between the track stop and the lower forward roller.
(2) Make sure that the rigging gage touches the track stop and the lower
forward roller.
(3) If necessary, turn the actuator drive to adjust the slat.
Subtask 27-84-49-410-051
D. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (3):
(a) (Ref. TASK 27-84-45-400-007)
- FOR 6027CM
install the torque shaft 6028CM
- FOR 6029CM
install the torque shaft 6028CM
- FOR 6035CM
install the torque shaft 6036CM
- FOR 6039CM
install the torque shaft 6038CM
- FOR 6045CM
install the torque shaft 6044CM
- FOR 6077CM
install the torque shaft 6078CM



EFF :
ALL
 27-84-49


R 
AIJ




Page 413
Nov 01/09

- FOR 6079CM
install the
- FOR 6085CM
install the
- FOR 6089CM
install the
- FOR 6095CM
install the

torque shaft 6078CM


torque shaft 6086CM
torque shaft 6088CM
torque shaft 6094CM.

(3) Install the applicable torque shaft (6):


(a) (Ref. TASK 27-84-45-400-008)
- FOR 6027CM
install the torque shaft 6026CM
- FOR 6029CM
install the torque shaft 6030CM
- FOR 6077CM
install the torque shaft 6076CM
- FOR 6079CM
install the torque shaft 6080CM.
(b) (Ref. TASK 27-84-45-400-013)
- FOR 6035CM
install the torque shaft 6034CM
- FOR 6085CM
install the torque shaft 6084CM.
(c) (Ref. TASK 27-84-45-400-007)
- FOR 6039CM
install the torque shaft 6040CM
- FOR 6089CM
install the torque shaft 6090CM.
(d) (Ref. TASK 27-84-45-400-014)
- FOR 6045CM
install the torque shaft 6046CM
- FOR 6095CM
install the torque shaft 6096CM.
Subtask 27-84-49-865-056
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.



EFF :
ALL
 27-84-49


R 
AIJ




Page 414
Nov 01/09

Subtask 27-84-49-740-051
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC
1.

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button.

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>.

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU.

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).



EFF :
ALL
 27-84-49


R 
AIJ




Page 415
Nov 01/09

Subtask 27-84-49-820-050
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-84-48-000-001):
- make sure that the FPPU removal and installation angle values agree
by 0.1 deg.
- make sure that the APPU removal and installation angle values agree
by 0.1 deg.
- make sure that the APPU/FPPU angles (deg) agree by 1.3 deg.
- make sure that the LH APPU and the RH APPU angles agree by 0.45
deg.
(2) If the APPU/FPU angles are not in the specified limit:
(a) Disconnect the torque shaft outboard of the actuator (Ref. TASK
27-84-49-000-001).
(b) Turn the torque shaft in the applicable direction until the APPU
and the FPU angles (deg) are in the specified limit.
NOTE : A turn of the torque shaft by one spline is equal to 0.11
____
deg. of the PPU angle.
(c) Connect the torque shaft outboard of the actuator (Ref. TASK 2784-49-400-001).
Subtask 27-84-49-710-050
H. Test
(1) Do the operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-49-942-050
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.



EFF :
ALL
 27-84-49


R 
AIJ




Page 416
Nov 01/09

(3) Remove the warning notice(s).


(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-49


R 
AIJ




Page 417
Nov 01/09

TASK 27-84-49-000-002
Removal of the Type B Actuators 6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
98D27504030001
98D27803500001
98D27804007000

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
adjustable access platform 3.5 m (11 ft. 6 in.)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
2 TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12)



EFF :
ALL
 27-84-49



AIJ




Page 418
Nov 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-45-000-006

27-84-45-000-011
27-84-45-000-012
27-84-48-400-001
31-32-00-860-006
R

27-84-49-991-001

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shaft 6032CM(6082CM)
Removal of the Torque Shaft 6034CM(6084CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-49-991-001)


Subtask 27-84-49-941-053
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-49-860-051
B. Aircraft Maintenance Configuration
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the slat/flap control lever on panel 114VU.



EFF :
ALL
 27-84-49



AIJ




Page 419
Feb 01/07

Subtask 27-84-49-740-053
C. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC
1.

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button.

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>.

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU.

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
NOTE : These angles, shown at
____
removal, will be used as a
datum. They will let you
compare the APPU and the
FPPU angles after the
installation of the
actuator (Ref. TASK 27-8448-400-001).
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.



EFF :
ALL
 27-84-49


R 
AIJ




Page 420
Feb 01/07

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
Subtask 27-84-49-865-055
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-49-010-052
E. Get Access
(1) Put an adjustable access platform in position below the applicable
torque shaft.
(2) Remove the applicable torque shaft (3):
(a) (Ref. TASK 27-84-45-000-006)
- FOR 6037CM
remove the torque shaft FIN
- FOR 6041CM
remove the torque shaft FIN
- FOR 6087CM
remove the torque shaft FIN
- FOR 6091CM
remove the torque shaft FIN

6036CM
6040CM
6086CM
6090CM.

(b) (Ref. TASK 27-84-45-000-011)


- FOR 6033CM
remove the torque shaft FIN 6032CM
- FOR 6083CM
remove the torque shaft FIN 6082CM.



EFF :
ALL
 27-84-49


R 
AIJ




Page 421
Feb 01/07

(3) Remove the applicable torque shaft (1):


(a) (Ref. TASK 27-84-45-000-012)
- FOR 6033CM
remove the torque shaft FIN 6034CM
- FOR 6083CM
remove the torque shaft FIN 6084CM.
(b) (Ref. TASK 27-84-45-000-006)
- FOR 6037CM
remove the torque shaft FIN
- FOR 6041CM
remove the torque shaft FIN
- FOR 6087CM
remove the torque shaft FIN
- FOR 6091CM
remove the torque shaft FIN
R

6038CM
6042CM
6088CM
6092CM.

(4) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001)
is installed (Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-49-991-001)
Subtask 27-84-49-020-051
A. Removal of the Type B Actuators
(1) Hold the actuator (2) and remove the bolts (4) and the washers (5).
Remove the actuator (2).
(2) If you remove both actuators from a slat, install a TOOL-ALIGNMENT
AND LOCKING (SLAT TRACKS 5 TO 12) (98D27804007000) in each pinnion
after each actuator (2) is removed or the slat will extend.



EFF :
ALL
 27-84-49



AIJ




Page 422
Nov 01/08

TASK 27-84-49-400-002
Installation of the Type B Actuators 6033CM(6083CM)/6037CM(6087CM)/
6041CM(6091CM)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27804012000

safety barriers
warning notice(s)
1 GAGE-RIGGING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-018
GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)
R
Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007
Material No. 19-003

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :
ALL
 27-84-49



AIJ




Page 423
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-41-00-861-002
24-41-00-862-002
27-50-00-400-003
27-80-00-866-005
27-84-00-710-001
27-84-45-000-006

27-84-45-000-011
27-84-45-400-006
27-84-45-400-007

27-84-45-400-012
27-84-48-000-001
27-84-49-000-002
27-84-49-400-002
31-32-00-860-006
27-84-49-991-001
FOR FIN 6083CM
27-84-45-000-012

Energize the Aircraft Electrical Circuits from the


External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM(6086CM)/
6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)/6044CM(6
094CM)
Removal of the Torque Shaft 6032CM(6082CM)
Installation of the Torque Shaft 6012CM(6062CM)
Installation of the Torque Shafts
6014CM(6064CM)/6028CM(6078CM)/6036CM
(6086CM)/6038CM(6088CM)/6040CM(6090CM)/6042CM(6092CM)
/6044CM(6094CM)
Installation of the Torque Shaft 6032CM(6082CM)
Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Installation of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/ 6041CM(6091CM)
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Fig. 401
Removal of the Torque Shaft 6034CM(6084CM)



EFF :
ALL
 27-84-49


R 
AIJ




Page 424
Nov 01/09

3. __________
Job Set-up
R

(Ref. Fig. 401/TASK 27-84-49-991-001)


Subtask 27-84-49-941-055
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) are in the cockpit to tell
persons not to operate the slat controls.
Subtask 27-84-49-860-053
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are retracted fully (Ref. TASK 27-80-00-866005).
(2) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the adjustable access platform is below the applicable
torque shaft.
(4) Make sure that the applicable torque shaft (3) is removed:
(a) (Ref.
- FOR
the
- FOR
the
- FOR
the
- FOR
the

TASK 27-84-45-000-006)
6037CM
torque shaft 6036CM
6041CM
torque shaft 6040CM
6087CM
torque shaft 6086CM
6091CM
torque shaft 6090CM.

(b) (Ref.
- FOR
the
- FOR
the

TASK 27-84-45-000-011)
6033CM
torque shaft 6032CM
6083CM
torque shafts 6082CM and 6086CM.



EFF :
ALL
 27-84-49



AIJ




Page 425
Feb 01/07

(5) Make sure that the applicable torque shaft (1) is removed:
(a) (Ref.
- FOR
the
- FOR
the

TASK 27-84-45-000-012)
6033CM
torque shaft 6034CM
6083CM
torque shaft 6032CM

(b) (Ref.
- FOR
the
- FOR
the
- FOR
the
- FOR
the

TASK 27-84-45-000-006)
6037CM
torque shaft 6090CM
6041CM
torque shaft 6042CM
6087CM
torque shaft 6032CM
6091CM
torque shaft 6082CM.

(6) If the two actuators (2) have been removed from the slat, make sure
that the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3) is
installed in each pinion.
R

(7) Make sure that a LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
(Ref. TASK 27-50-00-400-003) as follows:
- on the torque shaft inboard of the removed component
- on the torque shaft outboard of the removed component.
Subtask 27-84-49-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-49-991-001)
NOTE : The slat actuators are vented units filled with grease. It is normal
____
for this grease to have some oil separation. The external surfaces of
the slat actuators may be moist with this separated oil as they are
not hermetically sealed units. However, any separated oil in the
units that touches the grease will be changed back during operation.



EFF :
ALL
 27-84-49



AIJ




Page 426
Nov 01/08

The oil separation will decrease during in-service operation until


the lubricant is in a condition that is stable. This is normal and
will not cause damage to the units.
Subtask 27-84-49-420-053
R
R

A. Preparation for Installation


(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.

R
R
R

(4) Apply a thin layer of COMMON GREASE (Material No. 04-018) to the
actuator output splines.
(5) If the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12) are
installed, remove one TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO
12) and install the applicable actuator before you remove the other
TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12).
Subtask 27-84-49-420-051
B. Installation of the Type B Actuators
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (4).
(2) Install the actuator (2) and attach it with the bolts (4) and the
washers (5).
(3) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (4) and the washers (5).



EFF :
ALL
 27-84-49



AIJ




Page 427
Nov 01/09

Subtask 27-84-49-820-053
C. Dimensional Check
(1) To make sure that the track has not moved, put the GAGE-RIGGING
(98D27804012000) between the track stop and the lower forward roller.
(2) Make sure that the rigging gage contacts the track stop and the lower
forward roller.
(3) If necessary, turn the actuator drive to adjust the slat.
Subtask 27-84-49-410-052
D. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable torque shaft (3):
(a) (Ref. TASK 27-84-45-400-007)
- FOR 6037CM
install the torque shaft 6036CM
- FOR 6041CM
install the torque shaft 6040CM
- FOR 6087CM
install the torque shaft 6086CM
- FOR 6091CM
install the torque shaft 6090CM.
(b) (Ref. TASK 27-84-45-400-012)
- FOR 6033CM
install the torque shaft 6032CM
- FOR 6083CM
install the torque shaft 6082CM.
(3) Install the applicable torque shaft (1):
(a) (Ref. TASK 27-84-45-400-012)
- FOR 6033CM
install the torque shaft 6034CM
- FOR 6083CM
install the torque shaft 6084CM.



EFF :
ALL
 27-84-49


R 
AIJ




Page 428
Nov 01/09

(b) (Ref. TASK 27-84-45-400-006)


- FOR 6037CM
install the torque shaft 6038CM
- FOR 6041CM
install the torque shaft 6042CM
- FOR 6087CM
install the torque shaft 6088CM
- FOR 6091CM
install the torque shaft 6092CM.
Subtask 27-84-49-865-057
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-49-740-054
F. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).
(3) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC
1.

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button.

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L)


SYSTEM DATA SLT>.

- the MCDU shows the SLAT SYSTEM DATA


submenu.

4. Push (in) the line key (1L) <PPU.

- the MCDU shows the PPU DATA page(s).



EFF :
ALL
 27-84-49


R 
AIJ




Page 429
Nov 01/08

------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------5. Write down the APPU and the FPPU
angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print-out of the screen.
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
7. De-energize the aircraft
electrical circuits (Ref. TASK
24-41-00-862-002).
Subtask 27-84-49-820-052
G. Adjustment After BITE Test
(1) Compare the APPU and the FPPU angles (deg) with those that were
written down (or printed) before the actuator was removed (Ref. TASK
27-84-48-000-001):
- make sure that the FPPU removal and installation angle values agree
by 0.1 deg.
- make sure that the APPU removal and installation angle values agree
by 0.1 deg.
- make sure that the APPU/FPPU angles (deg) agree by 1.3 deg.
- make sure that the LH APPU and the RH APPU angles agree by 0.45
deg.
(2) If the APPU/FPU angles are not in the specified limit:
(a) Disconnect the torque shaft outboard of the actuator (Ref. TASK
27-84-49-000-002).
(b) Turn the torque shaft in the applicable direction until the APPU
and the FPU angles (deg) are in the specified limit.
NOTE : A turn of the torque shaft by one spline is equal to 0.11
____
deg. of the PPU angle.
(c) Connect the torque shaft outboard of the actuator (Ref. TASK 2784-49-400-002).



EFF :
ALL
 27-84-49


R 
AIJ




Page 430
Nov 01/08

Subtask 27-84-49-710-051
H. Test
(1) Do the operational test of the slat power-transmission system
(Ref. TASK 27-84-00-710-001).
5. Close-up
________
Subtask 27-84-49-942-051
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-49


R 
AIJ




Page 431
Nov 01/08

CONTROL UNIT - POWER (PCU) (SLATS) (6001CM) - REMOVAL/INSTALLATION


__________________________________________________________________
TASK 27-84-51-000-001
Removal of the Power Control Unit 6001CM of the Slat System
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R
R

No specific
No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

1
1
1
2
1

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
CONTAINER - HYDRAULIC FLUID RESISTANT
WARNING NOTICE(S)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-51



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-50-00-400-003
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
31-32-00-860-006
32-12-00-010-001
27-84-51-991-001
27-84-51-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Open the Main Gear Doors for Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-84-51-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-51-740-050
B. Do a Check of the Position Pick-Off Units (PPUs) on the Centralized Fault
Display System (CFDS)
(1) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the Multipurpose
Control Display Unit (MCDU) (Ref. TASK 31-32-00-860-006).



EFF :
ALL
 27-84-51



AIJ




Page 402
Nov 01/08

(2) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC 1

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L) SYSTEM - the MCDU shows the SLAT SYSTEM DATA
DATA SLT>
submenu.
4. Push (in) the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Record the values and use them as


a datum to compare the data of the
PPUs after the installation of the
PCU.
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
Subtask 27-84-51-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-51-010-050
D. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-84-51



AIJ




Page 403
Feb 01/11

Subtask 27-84-51-860-050
E. Aircraft Maintenance Configuration
(1) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).
R

(3) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.

(4) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the


main gear main door opening.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission outboard of the bevel gearbox 6011CM
(Ref. TASK 27-50-00-400-003).
(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the right slat transmission outboard of the bevel gearbox 6061CM
(Ref. TASK 27-50-00-400-003).

(7) Put a CONTAINER - HYDRAULIC FLUID RESISTANT in position below the


Power Control Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-51-991-001, 402/TASK 27-84-51-991-002)
Subtask 27-84-51-020-050
A. Removal of the Power Control Unit
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
(1) Disconnect the torque shaft 6002CM (11) as follows:
(a) Move the spring (15) and remove the pin (14).
(b) Remove the nuts (13) and the bolts (12) which connect the torque
shaft (11) to the input universal joint (10) of the PCU (1).



EFF :
ALL
 27-84-51



AIJ




Page 404
May 01/11

R
R

Power Control Unit


Figure 401/TASK 27-84-51-991-001



EFF :
ALL
 27-84-51



AIJ




Page 405
Feb 01/07

R
R

PCU-Slats Electrical and Hydraulic Connections


Figure 402/TASK 27-84-51-991-002



EFF :
ALL
 27-84-51



AIJ




Page 406
Feb 01/07

(c) Disconnect the torque shaft (11) from the input universal joint
(10).
(d) Remove the input universal joint (10) from the PCU (1).
(2) Prepare the PCU (1) for removal as follows:
(a) Disconnect the hydraulic lines (50).
(b) Remove the tie wraps (41) and disconnect the seal drain lines
(40).
(c) Disconnect the case drain lines (59) and (60).
(d) Install blanking caps on the open line ends (50).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connectors 26CV-A, 28CV-A, 28CV-B,
25CV-A, 4CN-B and 4CN-A.
R

(g) Put blanking caps on the disconnected electrical connector(s).


(h) Disconnect the electrical leads from the clamps which connect
them to the PCU (1).
(i) Remove and discard the cotter pins (20).
(j) Remove the nut (18) and the washer (19) from the bolt (16) which
connects the PCU (1) to the attachment rod assembly (22).
(k) Remove the nut (18) and the washer (19) from the bolt (26) which
connects the PCU (1) to the adjustable rod assembly (23).
(l) Cut, remove and discard the lockwire from the nut (6).
(m) Remove the nut (6), the washer (5) and the bolt (28).
(n) Remove the nut (4) and the washer (3) from the attachment bolt
(27).
(o) Remove the screw (7), the washer (8) and the bonding jumper (9).
(3) Hold the PCU (1) so that it can not fall.
NOTE : The PCU weighs approximately 20 kg (44.0924 lb).
____



EFF :
ALL
 27-84-51



AIJ




Page 407
Feb 01/11

(4) Remove the bolt (16) and the bush (17) from the attachment rod
assembly (22).
(5) Remove the bolt (26) and the bush (25) from the adjustable rod
assembly (23).
(6) Remove the attachment bolt (27) and the bush (2).
(7) Remove the PCU (1).



EFF :
ALL
 27-84-51



AIJ




Page 408
Feb 01/07

TASK 27-84-51-400-001
Installation of the Power Control Unit 6001CM of the Slat System
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______
ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

tie wraps

R
R
R

No
No
No
No

specific
specific
specific
specific

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)



EFF :
ALL
 27-84-51



AIJ




Page 409
May 01/11

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
98D27504030001
98D27803000000

Torque Wrench : range 0.20 to 3.60 m.daN


(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

Material No. 04-018


Material No. 05-005
Material No. 09-013
Material No. 11-002
Material No. 16-021
Material No. 19-010

GENERAL PURPOSE ASSEMBLY PASTE (Ref. 20-31-00)


USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-PRF-81733
SEALANT-BRUSH CONSIS TENCY (OBSOLETE) (Ref. 20-31-00)
USA MIL-PRF-680
DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
(Ref. 20-31-00)
F
ASNB70720
FLEXIBLE POLYURETHANE (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------20

cotter pin

27-84-03 06 -100



EFF :
ALL
 27-84-51


R 
AIJ




Page 410
May 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
20-28-00-912-004
27-00-00-080-002
27-00-00-480-002
27-50-00-000-003
27-50-00-400-003
27-80-00-866-005
27-81-00-820-001
27-84-00-710-001
29-00-00-864-001
29-10-00-863-001
29-10-00-863-003
29-14-00-614-001
29-14-00-614-002
31-32-00-860-006
32-12-00-410-001
27-84-51-991-001
27-84-51-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Manual Adjustment of the Position Pick-Off Units
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Close the Main Gear Doors after Access
Fig. 401
Fig. 402



EFF :
ALL
 27-84-51


R 
AIJ




Page 411
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-51-860-052
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission
(Ref. TASK 27-50-00-400-003).
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission
(Ref. TASK 27-50-00-400-003).

(9) Make sure that a CONTAINER - HYDRAULIC FLUID RESISTANT is in position


below the Power Control Unit (PCU) (1).
Subtask 27-84-51-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-51



AIJ




Page 412
May 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-51-991-001, 402/TASK 27-84-51-991-002)
Subtask 27-84-51-910-050
A. Preparation for Installation
R
(1) To install the same Power Control Unit (PCU), clean the splined
surfaces of the connections with CLEANING AGENTS (Material No. 11002).
(2) Clean the mounting bushes and make sure that they are in a good
condition.
Subtask 27-84-51-420-051
B. Installation of the Power Control Unit (9)
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Put the PCU (1) in position.
(4) Install the bush (2) and the attachment bolt (27).
(5) Attach the PCU (1) to the attachment rod assembly (22) with the bush
(17) and the bolt (16).
(6) Attach the PCU (1) to the adjustable rod assembly (23) with the bush
(25) and the bolt (26).
(7) Install the washer (3) and the nut (4) on the attachment bolt (27).
(8) TORQUE the nut (4) to between 2.4 and 2.7 m.daN (17.69 and 19.91
lbf.ft).



EFF :
ALL
 27-84-51



AIJ




Page 413
Nov 01/08

(9) Install the bolt (28) through the attachment bolt (27).
(10) Install the washer (5) and the nut (6) on the bolt (28).
(11) TORQUE the nut (6) to between 0.6 and 0.7 m.daN (53.09 and 61.94
lbf.in).
(12) Safety the nut (6) with lockwire MISCELLANEOUS (Material No. 19-010).
(13) Install the washer (19) and the nut (18) on the bolt (16) at the
attachment rod assembly (22).
(14) TORQUE the nut (18) to between 1.95 and 2.2 m.daN (14.38 and 16.22
lbf.ft).
(15) Safety the nut (18) with the cotter pin (20).
(16) Install the washer (19) and the nut (18) on the bolt (26) at the
adjustable rod assembly (23).
(17) TORQUE the nut (18) to between 1.95 and 2.2 m.daN (14.38 and 16.22
lbf.ft).
(18) Safety the nut (18) with the cotter pin (20).
(19) At the bonding point continue as follows:
(a) Put the bonding jumper (9) in position.
(b) Attach the bonding jumper (9) with the washer (8) and the screw
(7) (Ref. TASK 20-28-00-912-004).
(c) Seal the screw (7) with SEALANTS (Material No. 09-013).
R

(d) Apply STRUCTURE PAINTS (Material No. 16-021) (dyed blue) to the
bonding point.
(20) Apply COMMON GREASE (Material No. 04-018) to the splines of the input
universal joint (10).
(21) Engage the input universal joint (10) in the input of the PCU (1).
(22) Make sure that you can install the pin (14). If not, turn the
universal joint by the necessary number of splines.
(23) Install the pin (14) and safety it with the spring (15).



EFF :
ALL
 27-84-51



AIJ




Page 414
Nov 01/08

(24) Install the torque shaft 6002CM (11) as follows:


(25) Put the torque shaft (11) in position.
(26) Make sure that the flange holes of the torque shaft (11) are in line
with the flange holes of the input universal joint (10).
(27) If the flange holes of the torque shaft (11) are not in line with the
flange holes of the input universal joint (10), continue as follows:
(a) Remove the torque shaft (11) from the bevel gearbox.
(b) Turn the input universal joint (29) by the number of splines
necessary to align the flange halves of the universal joint (10)
and the torque shaft (11).
NOTE : If you can not align the flange halves remove the nuts
____
(13) and the bolts (12) and turn the universal joint (29)
and the torque shaft (11) as necessary. Install the bolts
(12) and nuts (13) as written below.
(28) Install the bolts (12) to connect the torque shaft (11) to the input
universal joint (10).
(29) Install the nuts (13) on the bolts (12).
(30) TORQUE the nuts (13) to between 1.02 and 1.24 m.daN (90.26 and 109.73
lbf.in).
(31) Apply SPECIAL MATERIALS (Material No. 05-005) to the nuts (13) and
the bolts (12).
(32) Install the pin (14).
(33) Safety the pin (14) with the spring (15).
(34) Remove the blanking caps from the electrical connectors.
(35) Connect the electrical connectors 4CN-A, 4CN-B, 25CV-A, 28CV-B,
28CV-A, and 26CV-A.
(36) Install the clamps which attach the electrical leads to the PCU (1).
(37) Remove the blanking caps from the line ends (50).
(38) Make sure that the hydraulic line end-fittings are serviceable.
(39) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the
line end fittings.
(40) Remove the blanking plugs from the ports of the PCU (1).


EFF :
ALL
 27-84-51


R 
AIJ




Page 415
Nov 01/08

(41) Connect the hydraulic lines (50) to the PCU (1).


(42) TORQUE the union nuts of the hydraulic lines (50) to between 5.4 and
5.9 m.daN (39.82 and 43.51 lbf.ft).
(43) Connect the case drain lines (59) and (60) .
(44) TORQUE the union nuts of the case drain lines (59) and (60) to
between 1.5 and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(45) Connect the seal drain lines (40) and attach them with the tie wraps
(41).
Subtask 27-84-51-860-051
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission (Ref. TASK 27-50-00-000-003).

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission (Ref. TASK 27-50-00-000-003).
(3) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Make sure that the level of the fluid in the reservoirs is correct.
Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 1212-29-611-002).
(5) Pressurize the Green and the Blue hydraulic systems (Ref. TASK 29-1000-863-001), (Ref. TASK 29-10-00-863-003).
(6) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (Ref. TASK 27-0000-080-002) from the slat/flap control lever.
(7) Remove the warning notice(s).
(8) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-51-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV



EFF :
ALL
 27-84-51



AIJ




Page 416
Nov 01/08

Subtask 27-84-51-710-050
E. Test
(1) Do a Check of the Position Pick-Off Units (PPUs) on the Centralized
Fault Display System (CFDS)
(a) Get access to the SYSTEM REPORT/TEST (F/CTL) page on the
Multipurpose Control Display Unit (MCDU) (Ref. TASK 31-32-00-860006).
(b) Do a check of the slat PPU angles (deg) at the slat/flap control
lever position 0 on the MCDU as follows:
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On the MCDU:
- push (in) the line key < SFCC 1

On the MCDU:
- the MCDU shows the SFCC 1 menu page
1.

2. Push (in) the NEXT PAGE button

- the MCDU shows the SFCC 1 menu page


2.

3. Push (in) the line key (2L) SYSTEM - the MCDU shows the SLAT SYSTEM DATA
DATA SLT>
submenu.
4. Push (in) the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Compare the values with the values


before the removal of the PCU. If
the values do not agree, do the
adjustment of the applicable
position pick-off unit (Ref. TASK
27-81-00-820-001).
6. Push the line key < RETURN
frequently until the CFDS menu
page is shown.
(2) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(3) Make sure that there are no leaks and that no fluid comes out of the
seal drain lines (41).



EFF :
ALL
 27-84-51



AIJ




Page 417
Feb 01/11

5. Close-up
________
Subtask 27-84-51-860-053
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-84-51-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-51


R 
AIJ




Page 418
Feb 01/07

BRAKE - PRESSURE OFF, SLATS PCU - REMOVAL/INSTALLATION


______________________________________________________
TASK 27-84-52-000-001
Removal of the Pressure-Off Brake of the Slat Power Control Unit
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

blanking plugs
circuit breaker(s) safety clip(s)
warning notice

R
R

No specific
No specific
98D27504030001
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-52



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-52-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-84-52-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-52-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-52-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-84-52



AIJ




Page 402
Feb 01/08

Subtask 27-84-52-860-050
D. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and Blue hydraulic systems are depressurized
and put them in the maintenance configuration (Ref. TASK 29-00-00864-001).
(3) Depressurize the reservoirs of the Blue and the Green hydraulic
systems (Ref. TASK 29-14-00-614-001).
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission.
(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the right slat transmission.
(7) Put a container in position below the Power Control Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-52-991-001)
Subtask 27-84-52-020-050
A. Removal of the Pressure-Off Brake
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the pressure-off brake at the valve
____
block 25CV is given. The removal procedure for the pressure-off
brake at the valve block 26CV is almost the same. The differences
in the procedures are given.



EFF :
ALL
 27-84-52



AIJ




Page 403
Feb 01/11

R
R

Pressure-Off Brake
Figure 401/TASK 27-84-52-991-001



EFF :
ALL
 27-84-52



AIJ




Page 404
Feb 01/07

(1) Remove the pressure-off brake (POB) (41) together with the hydraulic
motor (7) and the block assembly (23) from the differential gearbox
(40).
(a) Disconnect and remove the hydraulic lines (11) from the valve
block assembly (23).
(b) Remove and discard the tie wrap (9) and disconnect the seal drain
line (10).
(c) Disconnect and remove the case drain line (8) from the hydraulic
motor (7).
(d) Install the blanking caps on the open line ends (8),(10),(11).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connector (22) from the valve block
assembly (23).
(g) Put blanking caps on the disconnected electrical connectors and
receptacles.
(h) Support the POB (41), the hydraulic motor (7) and the valve block
assembly (23).
(i) Remove the bolts (3) and the washers (2).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the POB (41) together with the hydraulic motor (7) and the
valve block assembly (23).
(2) Remove the POB (41) from the hydraulic motor (7) and the valve block
assembly (23).
(a) Remove the bolts (6) and the washers (5).
(b) Carefully remove the hydraulic motor (7) and the POB (41) from
the transfer tubes (14),(33) on the valve block assembly (23).
(c) Remove and discard the O-ring (4).
(3) Remove and discard the O-rings (13),(20), the back-up rings (12),(15)
and the locking rings (21) from the transfer tubes (14).



EFF :
ALL
 27-84-52



AIJ




Page 405
Feb 01/07

(4) Remove and discard the O-rings (32),(35), the back-up rings (31),(34)
and the locking ring (30) from the transfer tube (33).



EFF :
ALL
 27-84-52



AIJ




Page 406
Feb 01/07

TASK 27-84-52-400-001
Installation of the Pressure-Off Brake of the Slat Power Control Unit
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific
No specific
98D27504030001
98D27803000000

tie wrap
1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-52


R 
AIJ




Page 407
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-002


Material No. 05-054

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

Material No. 06-001


R
R

Material No. 11-026


Material No. 19-003
C. Expendable Parts

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

O-ring
back-up
O-rings
back-up
O-rings
locking
locking
back-up
O-rings
back-up
O-rings

27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51

rings
rings
rings
ring
rings
rings



EFF :
ALL
 27-84-52



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-140
-180
-190
-200
-190
-200

Page 408
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-84-52-991-001
27-84-52-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 401
Fig. 402

3. __________
Job Set-up
Subtask 27-84-52-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-84-52



AIJ




Page 409
Feb 01/11

(6) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
(9) Make sure that a WARNING NOTICE(S) is in position below the Power
Control Unit (PCU) (1).
Subtask 27-84-52-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-52-991-001)
Subtask 27-84-52-910-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Use a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003) and
the CLEANING AGENTS (Material No. 11-026) to fully remove the
anti-corrosion compound from:
- the mating faces of the POB
- the mating face of the hydraulic motor
- the mating face of the PCU.



EFF :
ALL
 27-84-52



AIJ




Page 410
Aug 01/11

(2) Prepare a small quantity of a mixture of:


- 58 % of the zinc chromate putty SPECIAL MATERIALS (Material No. 05002) and
- 42 % of the zinc powder SPECIAL MATERIALS (Material No. 05-054).
(3) Apply
- the
- the
- the

a quantity of the prepared mixture to:


mating faces of the POB
mating face of the hydraulic motor
mating face of the PCU.

(4) Apply the LUBRICANTS (Material No. 06-001) to the splined surfaces.
(5) If installed, remove the screw, the protection cap and the packing
from the replacement pressure-off brake.
(Ref. Fig. 402/TASK 27-84-52-991-002)
Subtask 27-84-52-420-050
B. Installation of the Pressure-Off Brake
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation procedure for the pressure-off brake at the valve
____
block 25CV is given. The installation procedure for the
pressure-off brake at the valve block 26CV is almost the same. The
differences in the procedures are given.
(1) Install the new back-up rings (12), back-up rings (15) and the new Orings (13), O-rings (20) and the new locking rings (21) on the
transfer tubes (14).



EFF :
ALL
 27-84-52


R 
AIJ




Page 411
Feb 01/08

R
R

Pressure-Off Brake - Removal of Storage Parts


Figure 402/TASK 27-84-52-991-002



EFF :
ALL
 27-84-52



AIJ




Page 412
Feb 01/07

(2) Install the new O-ring (4) to the POB (41).


(3) Install the new back-up rings (31), back-up rings (34), the new Orings (32), O-rings (35) and the new locking ring (30) on the
transfer tube (33).
(4) Install the transfer tubes (14),(33) in the valve block assembly
(23).
(5) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of the
bolts (6).
(6) Carefully install the hydraulic motor (7) on the transfer tubes (14)
of the valve block assembly (23).
(7) Carefully install the POB (41) on the transfer tube (33) of the valve
block assembly (23).
(8) Attach the POB (41) to the hydraulic motor (7) with the washers (5)
and the bolts (6).
(9) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and 84.95
lbf.in).
(10) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23).
(a) Install the POB (41), the hydraulic motor (7) and the valve block
assembly (23) together to the differential gearbox (40).
(b) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the studs (42) and to the threads of the bolts (3).
(c) Attach the POB (41) and the valve block assembly (23) to the
differential gearbox (40) with:
- the washers (2),
- the bolts (3),
- the washers (25).
(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(11) Connect the hydraulic lines.
(a) Remove the blanking caps and the blanking plugs from the line
ends (8),(10),(11) and from the PCU (1).



EFF :
ALL
 27-84-52


R 
AIJ




Page 413
Feb 01/08

(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of
the line end-fittings.
(d) Connect the case drain line (8).
(e) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(f) Connect the seal drain line (10) and attach it with the new tie
wrap (9).
(g) Connect the hydraulic lines (11).
(h) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(12) Connect the electrical connector.
(a) Remove the blanking caps from the electrical connector (22).
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(c) Connect the electrical connector (22) to the valve block assembly
(23).
Subtask 27-84-52-860-051
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission.

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission.
(3) Pressurize the resevoirs of the Blue and the Green hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).

(5) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.



EFF :
ALL
 27-84-52



AIJ




Page 414
Feb 01/08

(6) Remove the warning notice(s).


(7) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-52-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV
Subtask 27-84-52-710-050
E. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line (25).
5. Close-up
________
Subtask 27-84-52-860-052
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-84-52-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-52


R 
AIJ




Page 415
Feb 01/08

VALVE BLOCK - SLAT PCU (25CV,26CV) - REMOVAL/INSTALLATION


_________________________________________________________
TASK 27-84-53-000-001
Removal of the Valve Blocks 25CV, 26CV of the Power Control Unit (Slat)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the valve block 25CV is given. The removal
____
procedure for the valve block 26CV is almost the same. The differences
in the procedures are given.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

blanking caps
blanking plugs
circuit breaker(s) safety clip(s)
warning notice

R
R

No specific
No specific
98D27504030001
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53



AIJ




Page 401
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
R
R

27-50-00-400-003
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-53-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-84-53-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-53-865-050
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-53-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-84-53



AIJ




Page 402
Nov 01/08

Subtask 27-84-53-860-050
D. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized and put it in the maintenance configuration (Ref. TASK
29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission outboard of the bevel gearbox 6011CM
(Ref. TASK 27-50-00-400-003).
(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the right slat transmission outboard of the bevel gearbox 6061CM
(Ref. TASK 27-50-00-400-003).
(7) Put a container in position below the Power Control Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-53-991-001)
Subtask 27-84-53-020-050
A. Removal of the Valve Block
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
(1) You must remove the valve block assembly (23) together with the
hydraulic motor (7) and the pressure off brake (POB) (41) from the
differential gearbox (40).
(a) Disconnect the hydraulic lines (11).
(b) Remove and discard the tie wrap (9) and disconnect the seal drain
line (10).



EFF :
ALL
 27-84-53



AIJ




Page 403
Feb 01/11

R
R

Valve Block
Figure 401/TASK 27-84-53-991-001



EFF :
ALL
 27-84-53



AIJ




Page 404
Feb 01/07

(c) Disconnect the case drain line (8).


(d) Install the blanking caps on the open line ends (8),(9),(10).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connector (22) from the valve block
assembly (23).
R

(g) Put blanking caps on the disconnected electrical connector(s).


(h) Remove the bolts (3) and the washers (2).
(i) Support the POB (41), the valve block assembly (23) and the
hydraulic motor (7).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the valve block assembly (23) together with the POB (41)
and the hydraulic motor (7).
(2) Remove the valve block assembly (23) from the POB (41) and the
hydraulic motor (7).
(a) Remove the bolts (6) and the washer (5) from the hydraulic motor
(7).
(b) Carefully remove the hydraulic motor (7) from the POB (41) and
from the transfer tubes (14) on the valve block assembly (23).
(c) Remove and discard the O-ring (4).
(d) Carefully remove the POB from the transfer tube (33) on the valve
block assembly (23).
(3) Remove the transfer tubes (14),(33) from the valve block assembly
(23).
(a) Remove and discard the O-rings (13),(35) and the back-up rings
(12),(34) from the transfer tubes (14),(33).
(b) Remove and discard the locking rings (21),(30) which safety the
transfer tubes (14),(33).
(c) Remove the transfer tubes (14),(33) from the valve block assembly
(23).



EFF :
ALL
 27-84-53



AIJ




Page 405
Nov 01/10

(d) Remove and discard the back-up rings (15),(31) and the O-rings
(20),(32) from the transfer tubes (14),(33).



EFF :
ALL
 27-84-53



AIJ




Page 406
Feb 01/07

TASK 27-84-53-400-001
Installation of the Valve Blocks 25CV, 26CV of the Power Control Unit (Slat)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the valve block 25CV is given. The
____
installation procedure for the valve block 26CV is almost the same. The
differences in the procedures are given.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

1
1

No specific
No specific
98D27504030001
98D27803000000

1
1

tie wrap
warning notice
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CONTAINER - HYDRAULIC FLUID RESISTANT
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53


R 
AIJ




Page 407
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-002


Material No. 05-054

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT (NO LONGER PRODUCED)
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

Material No. 06-001


R
R

Material No. 11-026


C. Expendable Parts

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

O-ring
back-up
O-rings
back-up
O-rings
locking
locking
back-up
O-rings
back-up
O-rings

27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51

rings
rings
rings
rings
ring
ring



EFF :
ALL
 27-84-53



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-180
-140
-190
-200
-190
-200

Page 408
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-50-00-000-003
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-84-53-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 401

3. __________
Job Set-up
Subtask 27-84-53-860-055
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-84-53



AIJ




Page 409
Feb 01/11

(6) Make sure that the warning notice in position to tell persons not to
pressurize the hydraulic systems.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
R

(9) Make sure that a CONTAINER - HYDRAULIC FLUID RESISTANT is in position


below the Power Control Unit (PCU) (1).
Subtask 27-84-53-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-53-991-001)
Subtask 27-84-53-860-054
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-84-53



AIJ




Page 410
May 01/11

(3) Use CLEANING AGENTS (Material No. 11-026) and fully remove the
anti-corrosion compound from:
- the contact surface of the hydraulic motor,
- the contact surfaces of the POB,
- the contact surface of the PCU.
(4) Prepare a small quantity of a mixture of 58 % SPECIAL MATERIALS
(Material No. 05-002) and 42 % SPECIAL MATERIALS (Material No. 05054).
(5) Apply
- the
- the
- the

a quantity of the prepared mixture to:


contact surface of the hydraulic motor,
contact surfaces of the POB,
contact surface of the PCU.

(6) Apply LUBRICANTS (Material No. 06-001) to the splined surfaces.


(7) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the O-rings
(4),(13),(20),(32),(35).
Subtask 27-84-53-420-050
B. Installation of the Valve Block
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
(1) Install the new back-up rings (12), back-up rings (15) and the new Orings (13), O-rings (20) on the transfer tubes (14).
(2) Install the new O-ring (4) on the POB (41).



EFF :
ALL
 27-84-53



AIJ




Page 411
Aug 01/11

(3) Install the new O-rings (32), O-rings (35) the new back-up ring (31),
back-up ring (34) on the transfer tube (33).
R
R
R

(4) Put the end of the transfer tubes (33), (14) with the back-up rings
(15), (31) and the O-rings (20), (32) in their related holes in the
valve block assembly (23).

R
R

(5) Safety the transfer tubes (14), (33) with the new locking rings (21)
/ locking rings (30)
(6) Install the valve block assembly (23) with the hydraulic motor (7)
and the POB (41).
NOTE : You must install the valve block assembly (23) together with
____
the POB (41) and the hydraulic motor (7).
(a) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the bolts (6).
(b) Carefully install the hydraulic motor (7) on the transfer tubes
(14) of the valve block assembly (23).
(c) Carefully install the POB (41) on the transfer tube (33).
(d) Attach the POB (41) to the hydraulic motor (7) with the washers
(5) and the bolts (6).
(e) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and
84.95 lbf.in).
(7) Install the valve block assembly (23) with the POB (41) and the
hydraulic motor (7).
(a) Apply SPECIAL MATERIALS (Material No. 05-002) to the threads of
the studs (42) and to the threads of the bolts (3).
(b) Install the valve block assembly (23), the hydraulic motor (7)
and the POB (41) together to the differential gearbox (40).
(c) Attach the POB (41), the hydraulic motor (7) and the valve block
assembly (23) to the differential gearbox (40) with:
- the washers (2),
- the bolts (3),
- the washers (25),
- the nuts (24).



EFF :
ALL
 27-84-53



AIJ




Page 412
Feb 01/11

(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(8) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange,
- hydraulic motor flange,
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(9) Connect the hydraulic lines.
(a) Remove the blanking caps from the line ends (8),(10),(11).
(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of
the line end-fittings.
(d) Remove the blanking plugs from the PCU (1).
(e) Connect the seal drain line (10) and attach it with the new tie
wrap (9).
(f) Connect the case drain line (8).
(g) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(h) Connect the hydraulic lines (11).
(i) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(10) Connect the electrical connector (22).
(a) Remove the blanking caps from the electrical connectors (22).
(b) Make sure that the electrical connectors are clean and in the
correct condition.
(c) Connect the electrical connector (22) to the valve block assembly
(23).



EFF :
ALL
 27-84-53



AIJ




Page 413
Feb 01/07

Subtask 27-84-53-860-053
C. Preparation for the Test
R
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission (Ref. TASK 27-50-00-000-003).

R
R

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission (Ref. TASK 27-50-00-000-003).
(3) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Make sure that the level of fluid in the relevant hydraulic reservoir
is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).
(5) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(6) Remove the warning notice(s).
(7) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-53-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-53-710-050
E. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line.



EFF :
ALL
 27-84-53



AIJ




Page 414
Nov 01/08

5. Close-up
________
Subtask 27-84-53-860-056
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-84-53-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-53


R 
AIJ




Page 415
Feb 01/07

TASK 27-84-53-000-002
Removal of the Solenoid Valves of the Power Control Unit (Slat)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the retract solenoid valve of the valve block
____
25CV is given. The removal procedure for the extend solenoid valve, the
brake solenoid valve and the solenoid valves of the valve block 26CV are
almost the same. The differences in the procedures are given.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


warning notice

R
R

No specific
No specific
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53



AIJ




Page 416
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-53-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 402

3. __________
Job Set-up
Subtask 27-84-53-866-051
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-53-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-53-010-051
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-84-53



AIJ




Page 417
Feb 01/08

Subtask 27-84-53-860-051
D. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Put a container in position below the valve block (12).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-53-991-002)
Subtask 27-84-53-020-051
A. Removal of the Solenoid Valve
CAUTION : DO NOT INSTALL THE REMOVED SOLENOID VALVES WITH THE PARTNUMBER
_______
903A0000-01 ON THE WING TIP BRAKE. THIS CAN CAUSE MALFUNCTION
OF THE WING TIP BRAKE.
(1) Remove the bolts (4) and the washers (5).
(2) Install one of the bolts (4) in hole A in the solenoid valve (1).
(3) Use this bolt and carefully remove the solenoid valve (1) from the
valve block (12).
(4) Remove the bolt (4) from the hole in the solenoid valve (1).
(5) Remove and discard the O-rings (9),(10),(15),(16) and the back-up
rings (7),(6) from the solenoid valve (1).



EFF :
ALL
 27-84-53



AIJ




Page 418
Feb 01/11

R
R

Solenoid Valve
Figure 402/TASK 27-84-53-991-002



EFF :
ALL
 27-84-53



AIJ




Page 419
Feb 01/07

TASK 27-84-53-400-002
Installation of the Solenoid Valves of the Power Control Unit (Slat)
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the retract solenoid valve of the valve
____
block 25CV is specified. The installation procedure for the extend
solenoid valve, the brake solenoid valve and the solenoid valves of the
valve block 26CV are almost the same. If there are differences in the
procedures, they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27803000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53



AIJ




Page 420
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------6
7
9
10
15
16

back-up ring
back-up ring
O-ring
O-ring
O-ring
O-ring

27-84-53
27-84-53
27-84-53
27-84-53
27-84-53
27-84-53

01
01
01
01
01
01

-130
-120
-110
-100
-150
-140

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-84-53-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 402



EFF :
ALL
 27-84-53


R 
AIJ




Page 421
May 01/11

3. __________
Job Set-up
Subtask 27-84-53-860-057
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.

(7) Make sure that a CONTAINER - HYDRAULIC FLUID RESISTANT is in position


below the Power Control Unit (PCU) (1).
Subtask 27-84-53-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-53



AIJ




Page 422
May 01/11

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-53-991-002)
Subtask 27-84-53-420-051
A. Installation of the Solenoid Valve.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new back-up ring
(6), the new back-up ring (7) and the new O-ring (9).
(4) Install the new back-up rings (6),(7) and the new O-rings (9).
(5) Install the new O-ring (10), the new O-ring (15) and the new O-ring
(16) on the solenoid valve (1).
(6) Carefully install the solenoid valve (1) to the valve block (12).
(7) Install the washers (5) and the bolts (4).
(8) TORQUE the bolts (4) to between 0.25 and 0.27 m.daN (22.12 and 23.89
lbf.in).
Subtask 27-84-53-860-059
B. Preparation for the Test
(1) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(2) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001), (Ref. TASK 12-12-29-611-002).
R

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Remove the warning notice(s).
(5) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-84-53



AIJ




Page 423
Feb 01/08

Subtask 27-84-53-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-53-710-051
D. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Examine the solenoid valve and make sure that there are no leaks.
5. Close-up
________
Subtask 27-84-53-860-058
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001), (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the valve block (12).
(3) Remove the access platform(s).
Subtask 27-84-53-410-051
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-53


R 
AIJ




Page 424
Feb 01/07

TASK 27-84-53-000-003
Removal of the Filters of the Valve Blocks
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The removal procedure for the filter of the valve block 26CV is
____
specified. The removal procedure for the filter of the valve block 25CV
is almost the same. If there are differences in the procedures, they are
specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

circuit breaker(s) safety clip(s)


warning notice

R
R

No specific
No specific
98D27803000000

container 5.0 l (1.3208 USgal)


1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53



AIJ




Page 425
Feb 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-53-991-003

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 403

3. __________
Job Set-up
Subtask 27-84-53-865-056
A. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-53-010-052
B. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).
Subtask 27-84-53-860-052
C. Aircraft Maintenance Configuration
(1) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
R
R

(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main gear main door.
(3) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenace configuration (Ref. TASK
29-00-00-864-001).
(4) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).



EFF :
ALL
 27-84-53



AIJ




Page 426
Feb 01/11

(5) Put the warning notice in position to tell persons not to pressurize
the hydraulic
(6) Put a container in position below the valve block (1).
4. Procedure
_________
R

(Ref. Fig. 403/TASK 27-84-53-991-003)


Subtask 27-84-53-020-052
A. Removal of the Filter.
(1) Cut, remove and discard the lockwire.
(2) Remove the filter (3) from the valve block (1).
(3) Remove and discard the O-ring (2) from the filter (3).



EFF :
ALL
 27-84-53



AIJ




Page 427
Feb 01/07

R
R

Filter
Figure 403/TASK 27-84-53-991-003



EFF :
ALL
 27-84-53



AIJ




Page 428
Feb 01/07

TASK 27-84-53-400-003
Installation of the Filters of the Valve Blocks
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE : The installation procedure for the filter of the valve block 26CV is
____
specified. The installation procedure for the filter of the valve block
25CV is almost the same. If there are differences in the procedures,
they are specified.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

98D27803000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 CONTAINER - HYDRAULIC FLUID RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-53



AIJ




Page 429
May 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 02-003
R

lockwire, corrosion-resistant steel dia 0.6 mm (0.24


in.)
F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------2

O-ring

27-84-53 01 -060

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-84-00-710-001
29-00-00-864-001
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access



EFF :
ALL
 27-84-53



AIJ




Page 430
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-53-860-061
A. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(2) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.
(3) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R
R

(5) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.

R
R

(6) Make sure that a CONTAINER - HYDRAULIC FLUID RESISTANT is in position


below the Power Control Unit (PCU) (1).
Subtask 27-84-53-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
Subtask 27-84-53-420-052
A. Installation of the Filter
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-84-53



AIJ




Page 431
May 01/11

(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new O-ring (2)
and to the threads of the filter (3).
(4) Install the new O-ring (2) on the filter (3).
(5) Install the filter (3) complete with the O-ring (2) in the valve
block (1).
(6) Torque the filter (3) to between 4.0 and 4.5 m.daN (29.49 and 33.18
lbf.ft).
(7) Safety the filter (3) with the lockwire, corrosion-resistant steel
dia 0.6 mm (0.24 in.).
Subtask 27-84-53-860-063
B. Prepraration for the Test
(1) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(2) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
R

(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(4) Make sure that the work area is clean and clear of tool(s) and other
items.
(5) Remove the warning notice(s).
Subtask 27-84-53-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV
Subtask 27-84-53-710-052
D. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Examine the filter (3) and make sure that there are no leaks.



EFF :
ALL
 27-84-53



AIJ




Page 432
Feb 01/08

5. Close-up
________
Subtask 27-84-53-860-062
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of the fluid in the relevant hydraulic
reservoir is correct. Add fluid as necessary (Ref. TASK 12-12-29-611001) or (Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the valve block (1).
(3) Remove the access platform(s).
Subtask 27-84-53-410-052
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-53


R 
AIJ




Page 433
Feb 01/07

MOTOR - HYDRAULIC, SLAT PCU - REMOVAL/INSTALLATION


__________________________________________________
TASK 27-84-54-000-001
Removal of the Hydraulic Motor of the Slat Power Control Unit (6001CM) with the
Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
No specific

circuit breaker(s) safety clip(s)

No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

warning notice
container 5.0 l (1.3208 USgal)
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
CAP - BLANKING
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

1
1
2
1



EFF :
ALL
 27-84-54



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
27-84-54-000-002
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-54-991-001

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Removal of the Hydraulic Motor of the Slat Power
Control Unit (6001CM) without the Pressure-Off Brake
and the Valve Block Assembly
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 401

3. __________
Job Set-up
Subtask 27-84-54-866-050
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
R
R

(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION


(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-54-865-052
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-54-010-050
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).



EFF :
ALL
 27-84-54



AIJ




Page 402
Feb 01/08

Subtask 27-84-54-860-050
D. Aircraft Maintenance Configuration
R

(1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
opening of the main door of the main gear.
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized and put it in the maintenance configuration (Ref. TASK
29-00-00-864-001).
(3) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).
(4) Put the warning notice in position to tell persons not to pressurize
the hydraulic systems.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission.
(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the right slat transmission.
(7) Put a container in position below the Power Control Unit (PCU) (1).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-54-991-001)
Subtask 27-84-54-020-050
A. Removal of the Hydraulic Motor
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the hydraulic motor which is attached to
____
the valve block 25CV is given. The removal procedure for the
hydraulic motor which is attached to the valve block 26CV is
almost the same. The differences in the procedures are given in
the steps that follow.



EFF :
ALL
 27-84-54



AIJ




Page 403
Feb 01/11

R
R

Hydraulic Motor
Figure 401/TASK 27-84-54-991-001



EFF :
ALL
 27-84-54



AIJ




Page 404
Feb 01/07

(1) This procedure gives the removal procedure of the hydraulic motor (7)
with the pressure-off brake (POB) (41) and the valve block assembly
(23) from the differential gear box (40). If it is necessary to
remove only the hydraulic motor (7), refer to (Ref. TASK 27-84-54000-002).
(a) Disconnect the case drain line (8) from the hydraulic motor (7).
(b) Disconnect the hydraulic lines (11) from the valve block assembly
(23).
(c) Remove the tie wrap (9) and disconnect the seal drain line (10)
from the POB (41).
R

(d) Install the CAP - BLANKING on the open line ends (8),(10),(11).
(e) Install the blanking plugs in the ports of the PCU (1).
(f) Disconnect the electrical connectors (22) from the valve block
assembly (23).
(g) Put blanking caps on the disconnected electrical connectors (22)
and receptacles.
(h) Remove the bolts (3) and the washers (2).
(i) Support the hydraulic motor (7), the POB (41) and the valve block
assembly (23).
(j) Remove the nuts (24) and the washers (25) from the studs (42).
(k) Remove the hydraulic motor (7) with the POB (41) and the valve
block assembly (23).
(2) Remove the hydraulic motor (7) from the valve block assembly (23) and
the POB (41).
(a) Remove the bolts (6) and the washers (5).
(b) Carefully remove the hydraulic motor (7) from the POB (41) and
from the transfer tubes (14) on the valve block assembly (23).
(c) Remove and discard the O-ring (4).
(d) Carefully remove the POB (41) from the transfer tube (33).



EFF :
ALL
 27-84-54



AIJ




Page 405
May 01/11

(3) Remove and discard the O-rings (13),(35) and the back-up rings
(12),(34) from the transfer tubes (11).
R

(4) Remove and discard the (21),(30) from the transfer tubes (14),(33).
(5) Remove the transfer tubes (14),(33) from the valve block assembly
(23).
(6) Remove and discard the back-up rings (15),(31) and the O-rings
(20),(32) from the transfer tubes (14),(33).



EFF :
ALL
 27-84-54



AIJ




Page 406
May 01/11

TASK 27-84-54-400-001
Installation of the Hydraulic Motor of the Slat Power Control Unit (6001CM)
with the Pressure-Off Brake and the Valve Block Assembly
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R

No
No
No
No

specific
specific
specific
specific

No specific
No specific
98D27504030001
98D27803000000

1 ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE


1 CONTAINER 20 L (5,3 USGAL) - OIL RESISTANT
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION



EFF :
ALL
 27-84-54



AIJ




Page 407
Aug 01/11

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-002


Material No. 05-054
Material No. 06-001A
R
R

Material No. 11-026

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT AIR DRYING (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------4
12
13
15
20
21
30
31
32
34
35

O-ring
back-up
O-rings
back-up
O-rings
locking
locking
back-up
O-rings
back-up
O-rings

27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51
27-84-51

rings
rings
rings
rings
rings
rings



EFF :
ALL
 27-84-54



AIJ




01
01
01
01
01
01
01
01
01
01
01

-070
-150
-160
-150
-160
-140
-180
-190
-200
-190
-200

Page 408
Aug 01/11

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
27-84-54-400-002
29-00-00-864-001
29-10-00-863-001
29-10-00-863-003
29-14-00-614-001
29-14-00-614-002
32-12-00-410-001
27-84-54-991-001

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Installation of the Hydraulic Motor of the Slat Power
Control Unit (6001CM) without the Pressure-Off Brake
and the Valve Block Assembly
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 401

3. __________
Job Set-up
Subtask 27-84-54-860-053
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
R

(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in
position at the opening of the main door of the main gear.



EFF :
ALL
 27-84-54



AIJ




Page 409
Feb 01/11

(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.

R
R

(9) Make sure that a is in position below the Power Control Unit (PCU)
(1). CONTAINER 20 L (5,3 USGAL) - OIL RESISTANT
Subtask 27-84-54-865-050
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-54-991-001)
Subtask 27-84-54-910-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.



EFF :
ALL
 27-84-54



AIJ




Page 410
Aug 01/11

(1) Clean the component interface and/or the adjacent area.


(2) Do an inspection of the component interface and/or the adjacent area.
R

(3) Use CLEANING AGENTS (Material No. 11-026) and fully remove the
anti-corrosion compound from:
- the contact faces of the POB (41),
- the contact face of the hydraulic motor (7),
- the contact face of the PCU (1).
(4) Prepare a small quantity of a mixture of 58 % SPECIAL MATERIALS
(Material No. 05-002) and 42 % SPECIAL MATERIALS (Material No. 05054).
(5) Apply
- the
- the
- the

a quantity of the prepared mixture to:


contact faces of the POB (41),
contact face of the hydraulic motor (7),
contact face of the PCU (1).

(6) Apply LUBRICANTS (Material No. 06-001A) to the splined surfaces.


Subtask 27-84-54-420-051
B. Installation of the Hydraulic Motor
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation procedure for the hydraulic motor which is
____
attached to the valve block 25CV is given. The installation
procedure for the hydraulic motor which is attached to the valve



EFF :
ALL
 27-84-54



AIJ




Page 411
Aug 01/11

block 26CV is almost the same. The differences in the procedures


are given in the worksteps that follow.
(1) Install the new back-up rings (12), back-up rings (15) and the new Orings (13), O-rings (20) on the transfer tubes (14).
(2) Install the O-ring (4) to the POB (41).
(3) Install the new back-up rings (31), back-up rings (34) and the new Orings (32), O-rings (35) on the transfer tube (33).
(4) Put the transfer tubes (14),(33) in their related holes in the valve
block assembly (23).
(5) Safety the transfer tubes (14),(33) with the new locking rings (21)
and the locking rings (30).
(6) This procedure gives the installation procedure of the hydraulic
motor (7) with the POB (41) and the valve block assembly (23) to the
differential gear box (40). If it is necessary to install only the
hydraulic motor (7), refer to (Ref. TASK 27-84-54-400-002).
(7) Install the hydraulic motor (7) with the POB (41) on the valve block
assembly (23).
(a) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads
of the bolts (6).
(b) Carefully install the hydraulic motor (7) on the transfer tubes
(14) on the valve block assembly (23).
(c) Carefully install the POB (41) on the transfer tube (33).
(d) Attach the hydraulic motor (7) to the POB (41) with the washers
(5) and the bolts (6).
(e) TORQUE the bolts (6) to between 0.87 and 0.96 m.daN (76.99 and
84.95 lbf.in).
(8) Install the hydraulic motor (7) with the POB (41) and the valve block
assembly (23).
(a) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads
of the studs (42) and to the threads of the bolts (3).
(b) Install the hydraulic motor (7), the POB (41) and the valve block
assembly (23) to the differential gearbox (40).



EFF :
ALL
 27-84-54


R 
AIJ




Page 412
Feb 01/08

(c) Attach the POB (41) and the valve block assembly (23) to the
differential gearbox (40) with:
- the washers (2)
- the bolts (3)
- the washers (25)
- the nuts (24).
(d) TORQUE the bolts (3) and the nuts (24) to between 1.40 and 1.54
m.daN (10.32 and 11.35 lbf.ft).
(9) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange
- hydraulic motor flange
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(10) Connect the hydraulic lines.
(a) Remove the blanking caps from the line ends (8),(10),(11).
(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads
of the line end-fittings.
(d) Remove the blanking plugs from the PCU (1).
(e) Connect the case drain line (8) to the hydraulic motor (7).
(f) TORQUE the union nut of the case drain line (8) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(g) Connect the seal drain line (10) with the new tie wrap (9) to the
POB (11).
(h) Connect the hydraulic lines (11).
(i) TORQUE the union nuts of the hydraulic lines (11) to between 5.4
and 5.9 m.daN (39.82 and 43.51 lbf.ft).
(11) Connect the electrical connector (22).
(a) Remove the blanking cap from the electrical connector (22).
(b) Make sure that the electrical connectors are clean and in the
correct condition.



EFF :
ALL
 27-84-54


R 
AIJ




Page 413
Feb 01/08

(c) Connect the electrical connector (22) to the valve block assembly
(23).
Subtask 27-84-54-860-051
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission.

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission.
(3) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Pressurize the Green and the Blue hydraulic systems (Ref. TASK 29-1000-863-001) (Ref. TASK 29-10-00-863-003).

(5) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(6) Remove the warning notice(s).
(7) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-54-865-051
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV
Subtask 27-84-54-710-050
E. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Make sure that there are no leaks and that no fluid comes out of the
seal drain line (14).



EFF :
ALL
 27-84-54



AIJ




Page 414
Feb 01/08

5. Close-up
________
Subtask 27-84-54-860-052
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of fluid in the relevant hydraulic reservoir
is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the PCU (1).
(3) Remove the access platform(s).
Subtask 27-84-54-410-050
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-54


R 
AIJ




Page 415
Feb 01/08

TASK 27-84-54-000-002
Removal of the Hydraulic Motor of the Slat Power Control Unit (6001CM) without
the Pressure-Off Brake and the Valve Block Assembly
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27803000000

1
1
1
1
2
1

circuit breaker(s) safety clip(s)


ACCESS PLATFORM 2M (6 FT)
CAP - BLANKING
CONTAINER 5 L(1 1/2 USGAL)
WARNING NOTICE(S)
LOCK-TORQUE SHAFT (FLAPS AND SLATS)
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-00-00-480-002
27-80-00-866-005
29-00-00-864-001
29-14-00-614-001
32-12-00-010-001
27-84-54-991-002

Installation of the Flap/Slat Control-Lever Locking


Tool (98D27803000000)
Retracting the Slats on the Ground
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Depressurization of the Hydraulic Reservoirs
Open the Main Gear Doors for Access
Fig. 402



EFF :
ALL
 27-84-54



AIJ




Page 416
Nov 01/10

3. __________
Job Set-up
Subtask 27-84-54-866-051
A. Retraction of the Slats
(1) Retract the slats to the 0 degree position (Ref. TASK 27-80-00-866005).
(2) Install the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) (Ref. TASK 27-00-00-480-002) on the slat/flap
control lever.
Subtask 27-84-54-865-053
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-54-010-051
C. Open the main doors of the main gear (Ref. TASK 32-12-00-010-001).
Subtask 27-84-54-860-054
D. Aircraft Maintenance Configuration
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the
main door of the main gear.
(2) Make sure that the Green and the Blue hydraulic systems are
depressurized and put in the maintenance configuration (Ref. TASK 2900-00-864-001).
(3) Depressurize the reservoirs of the Green and the Blue hydraulic
systems (Ref. TASK 29-14-00-614-001).
R

(4) Put the WARNING NOTICE(S) in position to tell persons not to


pressurize the hydraulic systems.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to
lock the left slat transmission.



EFF :
ALL
 27-84-54



AIJ




Page 417
Nov 01/10

(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (98D27504030001) to


lock the right slat transmission.
(7) Put a CONTAINER 5 L(1 1/2 USGAL) in position below the hydraulic
motor (5).
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-54-991-002)
Subtask 27-84-54-020-051
A. Removal of the Hydraulic Motor
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
NOTE : The removal procedure for the hydraulic motor which is attached to
____
the valve block 25CV is given. The removal procedure for the
hydraulic motor which is attached to the valve block 26CV is
almost the same. The differences in the procedures are given in
the steps that follow.
(1) Disconnect the case drain line (4) from the hydraulic motor (5).
(2) Install the CAP - BLANKING on the open line ends (4).
(3) Remove the bolts (3) and the washers (2).
(4) Carefully remove the hydraulic motor (5) from the POB (9) and from
the transfer tubes (8).
(5) Remove and discard the O-ring (1).
(6) Remove and discard the O-rings (7) and the back-up rings (6) from the
transfer tubes (8).



EFF :
ALL
 27-84-54



AIJ




Page 418
Feb 01/08

R
R

Hydraulic Motor
Figure 402/TASK 27-84-54-991-002



EFF :
ALL
 27-84-54



AIJ




Page 419
Feb 01/07

TASK 27-84-54-400-002
Installation of the Hydraulic Motor of the Slat Power Control Unit (6001CM)
without the Pressure-Off Brake and the Valve Block Assembly
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

No specific
98D27504030001
98D27803000000

1 ACCESS PLATFORM 2M (6 FT)


1 CONTAINER 5 L(1 1/2 USGAL)
1 WARNING NOTICE(S)
Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
2 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 05-002

F
NSA 307110
TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
USA MIL-PRF-8116
PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)

Material No. 05-054


Material No. 06-001A
R
R

Material No. 11-026

ZINC POWDER (Ref. 20-31-00)


USA MIL-L-23398
SOLID FILM LUBRICANT AIR DRYING (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-84-54



AIJ




Page 420
Aug 01/11

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------1
6
7

O-ring
back-up rings
O-rings

27-84-51 01 -070
27-84-51 01 -150
27-84-51 01 -160

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-12-29-611-001
12-12-29-611-002
27-00-00-080-002
27-00-00-480-002
27-80-00-866-005
27-84-00-710-001
29-00-00-864-001
29-10-00-863-001
29-10-00-863-003
29-14-00-614-001
29-14-00-614-002
R

32-12-00-410-001
27-84-54-991-002

Fill the Hydraulic Fluid Reservoir with a Hand Pump


Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
Removal of the Flap/Slat Control-Lever Locking Tool
(98D27803000000)
Installation of the Flap/Slat Control-Lever Locking
Tool (98D27803000000)
Retracting the Slats on the Ground
Operational Test of the Slat System
Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
Pressurize the Green Hydraulic System
Pressurize the Blue Hydraulic System with a Ground
Power Supply
Depressurization of the Hydraulic Reservoirs
Pressurization of the Hydraulic Reservoirs through
the Ground Connector
Close the Main Gear Doors after Access
Fig. 402



EFF :
ALL
 27-84-54



AIJ




Page 421
Feb 01/07

3. __________
Job Set-up
Subtask 27-84-54-860-055
A. Aircraft Maintenance Configuration
(1) Make sure that the slats are in the 0 degree position (Ref. TASK 2780-00-866-005).
(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed (Ref. TASK 27-00-00-480-002) on the
slat/flap control lever.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the
opening of the main door of the main gear.
(4) Make sure that the Green and the Blue hydraulic systems are
depressurized and put them in the maintenance configuration
(Ref. TASK 29-00-00-864-001).
(5) Make sure that the reservoirs of the Green and the Blue hydraulic
systems are depressurized (Ref. TASK 29-14-00-614-001).
R

(6) Make sure that the WARNING NOTICE(S) in position to tell persons not
to pressurize the hydraulic systems.
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the left slat transmission.
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is installed to lock the right slat transmission.
(9) Make sure that a CONTAINER 5 L(1 1/2 USGAL) is in position below the
hydraulic motor (5).
Subtask 27-84-54-865-054
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-54



AIJ




Page 422
Nov 01/10

4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-54-991-002)
Subtask 27-84-54-910-053
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
R

(3) Use the CLEANING AGENTS (Material No. 11-026) and fully remove the
anti-corrosion compound from:
- the mating face of the POB (9)
- the mating face of the hydraulic motor (5).
(4) Prepare a small quantity of a mixture of 58 % of the SPECIAL
MATERIALS (Material No. 05-002) and 42 % of the SPECIAL MATERIALS
(Material No. 05-054).
(5) Apply a quantity of the prepared mixture to:
- the mating face of the POB (9)
- the mating face of the hydraulic motor (5).
(6) Apply the LUBRICANTS (Material No. 06-001A) to the splined surfaces.



EFF :
ALL
 27-84-54



AIJ




Page 423
Aug 01/11

Subtask 27-84-54-420-052
B. Installation of the Hydraulic Motor
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______
YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE
THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO
MUCH.
CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS
_______
LUBRICANT.
NOTE : The installation procedure for the hydraulic motor which is
____
attached to the valve block 25CV is given. The installation
procedure for the hydraulic motor which is attached to the valve
block 26CV is almost the same. The differences in the procedures
are given in the steps that follow.
(1) Install the new back-up rings (6) and the new O-rings (7) on the
transfer tubes (8).
(2) Install the new O-ring (1) on the POB (9).
(a) Apply the SPECIAL MATERIALS (Material No. 05-002) to the threads
of the bolts (3).
(b) Engage the splines on the shaft of the POB (9) with those in the
hydraulic motor (5).
(c) Carefully install the hydraulic motor (5) on the transfer tubes
(8) on the Pressure-Off Brake (POB) (9).
(d) Attach the hydraulic motor (5) to the POB (9) with the washers
(2) and the bolts (3).
(e) TORQUE the bolts (3) to between 0.87 and 0.96 m.daN (76.99 and
84.95 lbf.in).



EFF :
ALL
 27-84-54


R 
AIJ




Page 424
Feb 01/07

(3) Do a bonding test between the main bonding point of the power control
unit and the:
- POB flange
- hydraulic motor flange
- valve block assembly flange.
The resistance must not be more than 20 milliohms.
(4) Connect the hydraulic lines.
(a) Remove the blanking caps from the line ends (4).
(b) Make sure that the hydraulic line end-fittings are serviceable.
(c) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads
of the line end-fittings.
(d) Remove the blanking plugs from the hydraulic motor (5).
(e) Connect the case drain line (4) to the hydraulic motor (5).
(f) TORQUE the union nut of the case drain line (4) to between 1.5
and 1.7 m.daN (11.06 and 12.53 lbf.ft).
(g) Make sure that the electrical connectors are clean and in the
correct condition.
Subtask 27-84-54-860-056
C. Preparation for the Test
R

(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the right slat
transmission.

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) from the left slat
transmission.
(3) Pressurize the reservoirs of the Green and the Blue hydraulic systems
(Ref. TASK 29-14-00-614-002).
(4) Pressurize the Green and the Blue hydraulic systems (Ref. TASK 29-1000-863-001) (Ref. TASK 29-10-00-863-003).

(5) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. TASK 2700-00-080-002) from the slat/flap control lever.
(6) Remove the warning notice(s).



EFF :
ALL
 27-84-54



AIJ




Page 425
Feb 01/08

(7) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 27-84-54-865-055
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV
Subtask 27-84-54-710-051
E. Test
(1) Do the operational test of the slat system (Ref. TASK 27-84-00-710001).
(2) Make sure that there are no leaks.
5. Close-up
________
Subtask 27-84-54-860-057
A. Put the aircraft back to the serviceable condition.
(1) Make sure that the level of fluid in the relevant hydraulic reservoir
is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or
(Ref. TASK 12-12-29-611-002).
(2) Remove the container from below the hydraulic motor (5).
(3) Remove the access platform(s).
Subtask 27-84-54-410-051
B. Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).



EFF :
ALL
 27-84-54


R 
AIJ




Page 426
Feb 01/07

TRACK - SLAT 1 - REMOVAL/INSTALLATION


_____________________________________
TASK 27-84-61-000-001
Removal of the Slat Tracks 1 thru 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
98D27804014000

circuit breaker(s) safety clip(s)


safety barriers
warning notice
1 TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3, AND 4)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-48-000-001
27-84-63-000-001
27-84-69-000-001
R
R
R
R

57-41-37-000-004
57-41-37-000-005
27-84-61-991-001

Removal of the Type A Actuators


6013CM(6063CM)/6015CM(6065CM)
Removal of the No. 1 Slat
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)
Fig. 401



EFF :
ALL
 27-84-61



AIJ




Page 401
May 01/10

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-61-991-001)
Subtask 27-84-61-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-61-860-050
B. Aircraft Maintenance Configuration
(1) Make sure the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the flap
and slat control lever on panel 114VU.
Subtask 27-84-61-865-060
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-84-61-010-052
D. Get Access
(1) Remove the applicable closing plate(s) (Ref. TASK 27-84-69-000-001).
(2) Remove the Slat 1 (Ref. TASK 27-84-63-000-001).
(3) Remove the applicable access panels:
- for the left wing, remove the panels 521AB, 521BB, 521CB, 521EB
- for the right wing, remove the panels 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-005).

R
R

(4) For the tracks 2 and 3, remove the applicable actuator (Ref. TASK 2784-48-000-001).



EFF :
ALL
 27-84-61



AIJ




Page 402
May 01/10

R
R

No. 1 Slat - Location and Detail


Figure 401/TASK 27-84-61-991-001



EFF :
ALL
 27-84-61



AIJ




Page 403
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-84-61-991-001)


Subtask 27-84-61-020-053
A. Removal of the Slat Tracks 1 thru 4
NOTE : When slat tracks 1 and 4 are made it can be necessary to install
____
spacers in the main channel. This is to get the correct tolerance.
The number of spacers installed in a track can be between zero and
four. If spacers are installed, do not remove them when you remove
the track.
(1) Install the TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3, AND 4)
(98D27804014000) (2) through the guide (3) on the applicable track
(1):
- on the LH wing, install the TOOL-BACKSTOP SLAT (2) on the inboard
side of the track
- on the RH wing, install the TOOL-BACKSTOP SLAT (2) on the outboard
side of the track.
(2) Push the TOOL-BACKSTOP SLAT (2) against the rear stop (4) to
disengage it from the track stop.
(3) Pull the track (1) from its installed position and remove it.
(4) Remove the TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3, AND 4) (2) from the
track (1).



EFF :
ALL
 27-84-61



AIJ




Page 404
Feb 01/07

TASK 27-84-61-400-004
Installation of the Slat Tracks 1 thru 4
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
98D27804014000

safety barriers
spring gage
warning notice
1 TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3, AND 4)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
R

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 09-018
Material No. 09-019
Material No. 11-026

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-84-61



AIJ




Page 405
Nov 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 15-005
Material No. 15-007
Material No. 19-003
Material No. 19-010

AIB TN 10138 TYPE I GRADE 2


CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-001
20-28-00-912-004
27-84-48-000-001
27-84-48-400-001
27-84-63-000-001
27-84-68-400-001
27-84-69-000-001
27-84-69-400-001
32-00-00-481-001
R
R
R
R
R
R
R
R

57-41-37-000-004
57-41-37-000-005
57-41-37-400-002
57-41-37-400-005

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components with Rivets
Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Removal of the No. 1 Slat
Installation of the Slat-Track Pinion Assembly
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Installation of the Closing Plates for the Slat
Tracks 1 thru 12
Installation of the Safety Devices on the Landing
Gears
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the NACA Duct Panel 521BB(621BB)



EFF :
ALL
 27-84-61



AIJ




Page 406
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-61-991-003
27-84-61-991-004
27-84-61-991-002

Fig. 402
Fig. 403
Fig. 404

3. __________
Job Set-up
Subtask 27-84-61-941-058
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
(3) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.
Subtask 27-84-61-860-054
B. Aircraft Maintenance Configuration
(1) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever.
(2) Make sure that the applicable closing plates have been removed
(Ref. TASK 27-84-69-000-001).
(3) Make sure that the Slat 1 has been removed (Ref. TASK 27-84-63-000001).
(4) Make sure that the applicable access panels are removed:
- for the left wing, 521AB, 521BB, 521CB, 521EB
- for the right wing, 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-005).

R
R

(5) For the tracks 2 and 3, make sure that the applicable actuator has
been removed (Ref. TASK 27-84-48-000-001).



EFF :
ALL
 27-84-61



AIJ




Page 407
May 01/10

Subtask 27-84-61-865-063
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)
Subtask 27-84-61-280-051
A. Pre Installation Checks
NOTE : When slat tracks 1 and 4 are made it can be necessary to install
____
spacers in the main channel. This is to get the correct tolerance.
The number of spacers installed in a track can be between zero and
four.
(1) Do a friction check on the applicable pinion(s) with a spring gage
(Ref. TASK 27-84-68-400-001).
(2) For track 1, prepare the track for electrical bonding (Ref. TASK 2028-00-912-001).
Subtask 27-84-61-420-063
B. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-84-61


R 
AIJ




Page 408
May 01/10

R
R

Side Roller and Vertical Roller - Location and Detail


Figure 402/TASK 27-84-61-991-003



EFF :
ALL
 27-84-61



AIJ




Page 409
Feb 01/07

R
R

Slat-Track Clearances
Figure 403/TASK 27-84-61-991-004



EFF :
ALL
 27-84-61



AIJ




Page 410
Feb 01/07

Subtask 27-84-61-420-067
C. Installation of the Slat Tracks 1 thru 4
(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Put the TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3,
(2) through the guide (3) on the applicable
- on the LH wing, install the TOOL-BACKSTOP
side of the track
- on the RH wing, install the TOOL-BACKSTOP
side of the track.

AND 4) (98D27804014000)
track (1):
SLAT (2) on the inboard
SLAT (2) on the outboard

(2) Push and hold the rear stop (4) away from its locked position.
Install the track (1) into its correct location.
(3) Release the rear stop (4) and make sure that it is correctly engaged
in its locked position.
(4) Remove the TOOL-BACKSTOP SLAT (TRACKS 1, 2, 3, AND 4) (2) from the
track (1).
(5) For track 1, do the electrical bonding test (Ref. TASK 20-28-00-869002).
(6) Do a check of the position of the side-rollers at the track:
(a) Move the applicable track (1) through its full range of travel
and make sure that:
- for tracks 1, 2 and 3, the side-rollers (25) touch the track
(1) at some point of its travel
- the points that touch do not stop the smooth travel of the
track (1)
- for track 4, the forward side-rollers (25) have a clearance
(DIM. X) of between 1.25 mm (0.0492 in.) and 1.45 mm (0.0570
in.) at their nearest point to the track (1).
(7) If necessary, adjust the non-datum side-rollers (25):
NOTE : The non-datum side-rollers are those installed on the:
____
- outboard rib for the left wing
- inboard rib for the right wing.


EFF :
ALL
 27-84-61


R 
AIJ




Page 411
May 01/10

(a) Remove and discard the lockwire from the bolts (26).
(b) Remove the bolts (26), the side-roller(s) (25) and the shims
(27).
(c) Adjust the thickness of the shims (27):
- to reduce the friction, increase the thickness of the shims
(27) as necessary
- to make the side-rollers (25) touch the track (1) at some point
of its travel, decrease the thickness of the shims (27) as
necessary.
(d) On the track 1, prepare the side-rollers (25) for electrical
bonding (Ref. TASK 20-28-00-912-004).
(e) On the tracks 2, 3 and 4, apply a thin layer of COMMON GREASE
(Material No. 04-024) or COMMON GREASE (Material No. 04-004) to
the side-rollers (25) and the shims (27).
(f) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS
(Material No. 09-019) to the shanks of the bolts (26).
(g) Put the shims (27) and the side-rollers (25) in position and
install them with the bolts (26).
(h) Do the procedure again, as necessary, until the adjustment of the
side-roller(s) (25) is correct.
(8) Safety the bolts (26) with MISCELLANEOUS (Material No. 19-010).
(9) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (26) and the shims (27).
Subtask 27-84-61-220-105
D. Positional Check of the Top, Forward Vertical-Roller at the Track
(1) Move the applicable track (1) through its full range of travel and
make sure that:
- the smooth travel of the track (1) is not stopped by points that
touch between the track (1) and the vertical roller (32)
- the DIM. Z between the track (1) and the top, forward,
vertical-roller (32) is not more than 0.25 mm (0.0098 in.).



EFF :
ALL
 27-84-61


R 
AIJ




Page 412
May 01/10

Subtask 27-84-61-820-067
E. Adjustment of the Top, Forward Vertical-Roller
(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)

(1) Remove and discard the lockwire from the bolts (28).
(2) Remove the bolts (28), the locking ring (29) and the locking plate
(30).
(3) If necessary, adjust the top, forward, vertical-roller (32).
(a) Turn the eccentric bush (31) until the top, forward,
vertical-roller (32) touches the track (1).
(b) Move the track (1) through its full range of travel. Stop the
track (1) at the point of maximum load between the track (1) and
the top, forward, vertical-roller (32).
(c) Turn the eccentric bush (31) to get a clearance of less than 0.04
mm (0.0015 in.).
(d) Move the track (1) through its full range of travel and make sure
that the maximum clearance between the track (1) and the top,
forward, vertical-roller (32) is not more than 0.25 mm (0.0098
in.).
(e) Do the procedure again, as necessary, until the adjustment of the
top, forward, vertical-roller (32) is correct.
Subtask 27-84-61-420-064
F. Continuation of the Installation Procedure
(1) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shank of the bolt (28).
(2) Install the locking plate (30) and the locking ring (29) with the
bolt (28).
(3) Safety the bolt (28) with MISCELLANEOUS (Material No. 19-010).
(4) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolt (28), the locking ring (29) and the locking plate (30).



EFF :
ALL
 27-84-61



AIJ




Page 413
Feb 01/07

Subtask 27-84-61-220-104
G. Friction Check of the Position of the Top, Aft Vertical-Roller at the
Track
(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)

(1) Attach a spring gage to the applicable track (1).


NOTE : During this check keep the spring gage in the line-of-travel
____
of the track (1).
(2) Use the spring gage to move the track (1) from its fully extended
position to the fully retracted position. Monitor the spring gage and
make a record of the maximum value shown.
(3) Use the spring gage to extend the track (1) to its fully extended
position:
- if the spring gage pulls the track (1), make a record of the
maximum value shown
- if the track (1) extends by its weight and the spring gage holds it
back, make a record of the minimum value shown.
(4) Calculate the friction load as follows:
- for two maximum values, the friction load is the sum of the two
values
- for one maximum value and one minimum value, the friction load is
the difference of the two values.
(5) With the track (1) held against the two, top, vertical-rollers (32),
move the track (1) through its full range of travel. Make sure that
where the bottom, aft, vertical-roller (32) and the track (1) do not
touch, the clearance (DIM. Y) is not more than 0.25 mm (0.0098 in.).
(6) Adjust the top, aft, vertical-roller (32), if:
- the friction load is more than 6.2 daN (13.9381 lbf) and/or
- the clearance is more than 0.25 mm (0.0098 in.).
Subtask 27-84-61-820-070
H. Adjustment of the Top, Aft Vertical-Roller
(Ref. Fig. 402/TASK 27-84-61-991-003)

(1) Remove and discard the lockwire from the bolt (28).
(2) Remove the bolt (28), the locking ring (29) and the locking plate
(30).



EFF :
ALL
 27-84-61



AIJ




Page 414
Feb 01/07

(3) Move the applicable track (1) through its full range of travel.
(4) Adjust the eccentric bush (31) until the top, aft, vertical roller
(32) touches the track (1) at its highest point.
(5) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shank of the bolt (28).
(6) Install the locking plate (30) and the locking ring (29) with the
bolt (28).
(7) Safety the bolt (28) with MISCELLANEOUS (Material No. 19-010).
(8) Apply a layer of STORAGE PRESERVATION (Material No. 15-005) to the
bolt (28), the locking ring (29) and the locking plate (30).
Subtask 27-84-61-820-072
J. Adjustment of the Front Stop (Tracks 2 thru 4)
(Ref. Fig. 402/TASK 27-84-61-991-003, 404/TASK 27-84-61-991-002)
(1) Remove and discard the lockwire from the bolts (15) and the
applicable stop (14).
(2) Remove the bolts (15) and the applicable front stop (14).
(3) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (15).
(4) Loosely assemble the applicable stop (14) with the bolts (15).
(5) Put and hold the track (1) in its fully retracted position.
(6) Put the front stop (14) in position so that it is parallel with the
bottom, forward, vertical-roller (32) and tighten the bolts (15).
(7) Safety the bolts (15) with MISCELLANEOUS (Material No. 19-010).
(8) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (15).
Subtask 27-84-61-640-062
K. Lubrication
(1) Lubricate the side-rollers (25) and the top and bottom,
vertical-rollers (33) with COMMON GREASE (Material No. 04-024) or
COMMON GREASE (Material No. 04-004).

R
R



EFF :
ALL
 27-84-61



AIJ




Page 415
Nov 01/08

R
R

Slat-Track End-Stop - Location and Detail


Figure 404/TASK 27-84-61-991-002



EFF :
ALL
 27-84-61



AIJ




Page 416
Feb 01/07

5. Close-up
________
Subtask 27-84-61-410-058
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) For the tracks 2 and 3, install the actuators (Ref. TASK 27-84-48400-001).
(3) Install the applicable access panels:
- for the left wing, install the panels 521AB, 521BB, 521CB, 521EB
- for the right wing, install the panels 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-400-002) and (Ref. TASK 57-41-37-400-005).

R
R

(4) Install the applicable closing plate(s) (Ref. TASK 27-84-69-400-001).


Subtask 27-84-61-942-056
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-61



AIJ




Page 417
May 01/10

TASK 27-84-61-000-002
Removal of the Side-Rollers - Slat Tracks 1 thru 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-48-000-001

R
R
R
R

27-84-61-000-001
27-84-63-000-001
57-41-37-000-004
57-41-37-000-005
27-84-61-991-003
27-84-61-991-004

Removal of the Type A Actuators


6013CM(6063CM)/6015CM(6065CM)
Removal of the Slat Tracks 1 thru 4
Removal of the No. 1 Slat
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)
Fig. 402
Fig. 403



EFF :
ALL
 27-84-61



AIJ




Page 418
May 01/10

3. __________
Job Set-up
(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)
Subtask 27-84-61-941-056
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put the warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-61-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is on the
flap and slat control lever on panel 114VU.
Subtask 27-84-61-865-061
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-84-61-010-053
D. Get Access
(1) Remove the Slat 1 (Ref. TASK 27-84-63-000-001).
(2) Remove the applicable access panels:
- for the left wing, remove the panels 521AB, 521BB, 521CB, 521EB
- for the right wing, remove the panels 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-005).

R
R

(3) For the tracks 2 and 3, remove the applicable actuators (Ref. TASK
27-84-48-000-001).



EFF :
ALL
 27-84-61



AIJ




Page 419
May 01/10

(4) When it is necessary to remove all the side-rollers (25), remove the
applicable track (2) (Ref. TASK 27-84-61-000-001).
NOTE : To replace two or more side-rollers from opposite sides of the
____
track, you must remove all of the side-rollers. Keep the
serviceable side-rollers and their related shims together for
the installation.
To replace side-rollers at the same side of the track, remove
only the side-rollers you are to replace.
4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-84-61-991-003, 403/TASK 27-84-61-991-004)


Subtask 27-84-61-020-054
A. Removal of the Side-Rollers - Slat Tracks 1 thru 4
(1) Remove and discard the lockwire from the applicable bolts (26).
(2) Remove the bolts (26), the applicable side-rollers (25) and the shims
(27).



EFF :
ALL
 27-84-61



AIJ




Page 420
Feb 01/07

TASK 27-84-61-400-003
Installation of the Side-Rollers - Slat Tracks 1 thru 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R

No specific
No specific
No specific
98D27804021000

safety barriers
warning notices
1 MICROMETER - EXTERNAL
1 GAUGE-SLAT TRACK SETTING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


Material No. 09-018

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)



EFF :
ALL
 27-84-61



AIJ




Page 421
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 09-019
Material No. 15-007
Material No. 19-010

USA AMS 3267/3


NO LONGER AVAILABLE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-004
27-84-48-000-001
27-84-48-400-001
27-84-61-000-001
27-84-61-400-004
27-84-63-400-002
32-00-00-481-001
57-41-37-000-004
57-41-37-000-005
57-41-37-400-002
57-41-37-400-005
27-84-61-991-003
27-84-61-991-005

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Removal of the Slat Tracks 1 thru 4
Installation of the Slat Tracks 1 thru 4
Installation of the No. 1 Slat
Installation of the Safety Devices on the Landing
Gears
Removal of the Pressure-Relief Panels 521AB(621AB),
521CB(621CB), 521EB(621EB), 522AB(622AB),
522CB(622CB)
Removal of the NACA Duct Panel 521BB(621BB)
Installation of the Pressure-Relief Panels
521AB(621AB), 521CB(621CB), 521EB(621EB),
522AB(622AB), 522CB(622CB)
Installation of the NACA Duct Panel 521BB(621BB)
Fig. 402
Fig. 405



EFF :
ALL
 27-84-61


R 
AIJ




Page 422
Aug 01/11

3. __________
Job Set-up
Subtask 27-84-61-941-057
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
(3) Make sure that the warning notices are in position.
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed.
Subtask 27-84-61-860-055
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable access panels have been removed:
- for the left wing, 521AB, 521BB, 521CB, 521EB
- for the right wing, 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-000-004) and (Ref. TASK 57-41-37-000-005).

R
R

(2) For track 2 and 3, make sure that the applicable actuators have been
removed (Ref. TASK 27-84-48-000-001).
(3) Make sure that the applicable track has been removed (Ref. TASK 2784-61-000-001).
Subtask 27-84-61-865-062
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-61



AIJ




Page 423
May 01/10

4. Procedure
_________
Subtask 27-84-61-820-061
A. Preparation for Installation
(Ref. Fig. 402/TASK 27-84-61-991-003, 405/TASK 27-84-61-991-005)
(1) Use the GAUGE-SLAT TRACK SETTING (98D27804021000) to set the track
datum:
NOTE : This procedure is necessary when all the side rollers are
____
removed.
(a) Install the applicable setting track (44). (For the track 4,
install the slip gage (43) between the setting track (44) and the
rubbing block on the datum rib).
NOTE : The slip gage will give the necessary clearance of between
____
1.25 mm (0.0492 in.) and 1.45 mm (0.0570 in.) at the track
4 forward side-roller.
(b) Install and lock the two clamp assemblies (45) at the location of
the non-datum side-rollers:
- turn the thumb screws (46) equally until they stop.
(c) Install the gage assembly (47) with the washers (27) and the
bolts (26) at the the location of the aft datum side-roller:
- turn the torque screw (49) on the gage assembly (47) until it
stops, and lock it in position with the thumb screw (48).
(d) Do the procedure again for the forward datum side-roller.
(2) Calculate the thickness of the datum side-roller shims (28):
NOTE : This procedure is necessary when all the side rollers are
____
removed.
(a) Remove the bolts (26), the washers (27) and the gage assembly
(47) from the location of the aft datum side-roller.
(b) Set the micrometer (51) on the gage block (53) to zero.
(c) Install the gage assembly (47) on the gage block (53) and lock it
in position with the clamps (50).



EFF :
ALL
 27-84-61


R 
AIJ




Page 424
May 01/10

Slat-Track Rigging Tools


Figure 405/TASK 27-84-61-991-005


EFF :
ALL
 27-84-61


R 
AIJ




Page 425
May 01/10

(d) Move the micrometer (51) in the gage block (53) until it touches
the gage assembly (47) and lock it in this position with the
screw (52).
(e) Remove the gage assembly (47) from the gage block (53).
(f) Install the serviceable datum side-roller (25) on the gage block
(53) and lock it in position with the clamps (50).
(g) Adjust the micrometer (51) until it touches the datum side-roller
(25). Make a record of the dimension shown on the micrometer
(51).
R

(h) Use an MICROMETER - EXTERNAL and assemble the shims (28), until
their thickness agrees with the dimension you have just
calculated.
(i) Remove the aft datum side-roller (25) from the gage block (53).
(j) Keep the aft datum side-roller (25) and its shims (28) together.
(k) Do the procedure again for the forward datum side-roller.
(l) Remove the clamp assembly (43) and the setting track (44).
(m) For track 1, prepare the aft datum side-roller (25) for
electrical bonding (Ref. TASK 20-28-00-912-004).
Subtask 27-84-61-420-068
B. Installation of the Datum Side-Rollers
(1) For tracks 2, 3 and 4 apply a thin layer of COMMON GREASE (Material
No. 04-024) or COMMON GREASE (Material No. 04-004) to the interface
of the aft datum side-rollers (25) and the shims (27).
(2) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (26).
(3) Put the necessary thickness of shims (27) and the aft datum
side-roller (25) in position.
(4) Install the aft datum side-roller (25) and the shims (27) and the
bolts (26).
(5) Safety the bolts (26) with MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-84-61



AIJ




Page 426
Aug 01/11

(6) Do the procedure again for the front datum side-roller (25).
(7) If removed, install the applicable slat track (2) (Ref. TASK 27-8461-400-004).
(8) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (26) and the shims (27).
Subtask 27-84-61-420-062
C. Installation of One Side-Roller or a Pair on the Same Side
(1) For track 1, prepare the side-roller(s) (25) for electrical bonding
(Ref. TASK 20-28-00-912-004).
(2) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (26).
(3) Put the shims (27) and the side-roller(s) (25) in position.
(4) Install the bolts (26).
Subtask 27-84-61-820-073
D. Adjustment and Check of the Side Rollers
(1) Move the applicable track (1) through its full range of travel and
make sure that:
- for tracks 1, 2 and 3, the side-roller(s) (25) touch the track (1)
at some point of its travel
- the points that touch do not stop the smooth travel of the track
(1)
- for track 4, the forward side-roller(s) (25) have a clearance (DIM.
X) of between 1.25 mm (0.0492 in.) and 1.45 mm (0.0570 in.) at
their nearest point to the track (1).
(2) Adjust the side-rollers:
(a) Remove the bolts (26), the side-roller(s) (25) and the shims
(27).
(b) Adjust the thickness of the shims (27) as follows:
- to reduce the friction, increase thickness of the shims (27) as
necessary
- to make the side-roller(s) (25) touch the track (1) at some
point of its travel, decrease the thickness of the shims (27)
as necessary.



EFF :
ALL
 27-84-61


R 
AIJ




Page 427
May 01/10

(c) Install the side-roller(s) (25) and the shims (27) with the bolts
(26).
(d) Do the procedure again, as necessary, until the adjustment of the
side-roller(s) (25) is correct.
(3) Safety the bolts (26) with MISCELLANEOUS (Material No. 19-010).
(4) For track 1, do the electrical bonding test (Ref. TASK 20-28-00-869002).
(5) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (26) and the shims (27).
5. Close-up
________
Subtask 27-84-61-410-057
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) For the tracks 2 and 3, install the actuators (Ref. TASK 27-84-48400-001).
(3) Install the Slat 1 (Ref. TASK 27-84-63-400-002).
(4) Install the applicable access panels:
- for the left wing, install the panels 521AB, 521BB, 521CB, 521EB
- for the right wing, install the panels 621AB, 621BB, 621CB, 621EB
(Ref. TASK 57-41-37-400-002) and (Ref. TASK 57-41-37-400-005).

R
R

Subtask 27-84-61-942-055
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the warning notice(s).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-61



AIJ




Page 428
May 01/10

TRACK - SLAT 1 - INSPECTION/CHECK


_________________________________
TASK 27-84-61-200-001
Dimensional Check of the Slat-to-Track Attachment Fittings, Tracks 1 Thru 4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
R

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM
(Ref. 20-31-00)



EFF :
ALL
 27-84-61



AIJ




Page 601
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R

27-84-61-000-001
27-84-61-400-004
27-84-63-000-001
27-84-63-400-002
27-84-61-991-007
27-84-61-991-008

Removal of the Slat Tracks 1 thru 4


Installation of the Slat Tracks 1 thru 4
Removal of the No. 1 Slat
Installation of the No. 1 Slat
Fig. 601
Fig. 602

3. __________
Job Set-up
Subtask 27-84-61-941-059
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-61-860-052
B. Aircraft Maintenance Configuration
(Ref. Fig. 601/TASK 27-84-61-991-007, 602/TASK 27-84-61-991-008)

(1) Remove the No. 1 Slat (Ref. TASK 27-84-63-000-001).


(2) Remove the applicable Slat track (Ref. TASK 27-84-61-000-001).
(3) For the Slat tracks 1 and 2:
(a) Remove the nut (7), the washer (6) and the bolt (9).
(b) Remove the nut (16), the washer (15) and the bolt (32).
(c) Remove the nut (29), the locking plate (30), the nut (20), the
washers (18) and (19), the bolt (28) and the eccentric bush (27).
(d) Remove the links (4) and (10) and the bolt (31).



EFF :
ALL
 27-84-61



AIJ




Page 602
Feb 01/07

R
R

Slat No. 1, Tracks 1 and 2 - Attachment Details


Figure 601/TASK 27-84-61-991-007



EFF :
ALL
 27-84-61



AIJ




Page 603
Feb 01/07

R
R

Slat No. 1, Tracks 3 and 4 - Attachment Details


Figure 602/TASK 27-84-61-991-008



EFF :
ALL
 27-84-61



AIJ




Page 604
Feb 01/07

(e) Remove the adjustment link (22).


NOTE : The bolts (1) and (33) and their related nuts and washers
____
were removed when the Slat No. 1 was removed.
(4) For the Slat tracks 3 and 4:
(a) Remove the nut (15), the locking plate (16), the nut (8), the
washer (7), the bolt (14) and the eccentric bush (13).
(b) Remove the links (4) and (18) and the bolt (17).
NOTE : The bolts (1) and (20) were removed when the Slat No. 1
____
was removed.
4. Procedure.
__________
R

(Ref. Fig. 601/TASK 27-84-61-991-007, 602/TASK 27-84-61-991-008)


Subtask 27-84-61-220-052
A. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.977 |
|
|
| OD 1
|(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| B
| 19.057 | 19.078 |
|
|
| 19.110 |
|
| ID 2
|(0.7502) |(0.7511) |
|
|
|(0.7523) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61



AIJ




Page 605
Feb 01/07

Subtask 27-84-61-220-053
B. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 1
|(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| B
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 3
|(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-054
C. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 606
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.977 |
|
|
| OD 9
|(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| B
| 19.057 | 19.078 |
|
|
| 19.110 |
|
| ID 5
|(0.7502) |(0.7511) |
|
|
|(0.7523) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-055
D. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 9
|(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| B
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 8
|(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61


R 
AIJ




Page 607
Feb 01/07

Subtask 27-84-61-220-056
E. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.977 |
|
|
| OD 33 |(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.057 | 19.078 |
|
|
| 19.110 |
|
| ID 11 |(0.7502) |(0.7511) |
|
|
|(0.7523) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-057
F. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 608
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 33 |(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| C
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 12 |(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-058
G. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.977 |
|
|
| OD 32 |(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.057 | 19.078 |
|
|
| 19.110 |
|
| ID 14 |(0.7502) |(0.7511) |
|
|
|(0.7523) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61


R 
AIJ




Page 609
Feb 01/07

Subtask 27-84-61-220-059
H. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 32 |(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| C
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 13 |(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-060
J. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 610
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 17.966 | 17.984 |
|
| 17.943 |
|
|
| OD 28 |(0.7073) |(0.7080) |
|
|(0.7064) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 18.000 | 18.018 |
|
|
| 18.041 |
|
| ID 17 |(0.7086) |(0.7093) |
|
|
|(0.7102) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-061
K. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.189 | 22.210 |
|
| 22.176 |
|
|
| OD 25 |(0.8735) |(0.8744) |
|
|(0.8730) |
|
|
|
|
|
| 0.002 | 0.036 |
|
| 0.062 |
|
|
|
| (0.0000*| (0.0014*|
|
|(0.0024*|
| C
| 22.212 | 22.225 |
|
|
| 22.238 |
|
| ID 21 |(0.8744) |(0.8750) |
|
|
|(0.8755) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********



EFF :
ALL
 27-84-61


R 
AIJ




Page 611
Feb 01/07

Subtask 27-84-61-220-062
L. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 25.959 | 25.980 |
|
| 25.932 |
|
|
| OD 26 |(1.0220) |(1.0228) |
|
|(1.0209) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.116 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0045)|
| C
| 26.000 | 26.021 |
|
|
| 26.048 |
|
| ID 23 |(1.0236) |(1.0244) |
|
|
|(1.0255) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-063
M. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 612
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 17.966 | 17.984 |
|
| 17.943 |
|
|
| OD 28 |(0.7073) |(0.7080) |
|
|(0.7064) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 18.000 | 18.018 |
|
|
| 18.041 |
|
| ID 24 |(0.7086) |(0.7093) |
|
|
|(0.7102) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-064
N. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.977 |
|
|
| OD 1
|(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| B
| 19.057 | 19.078 |
|
|
| 19.110 |
|
| ID 2
|(0.7502) |(0.7511) |
|
|
|(0.7523) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61


R 
AIJ




Page 613
Feb 01/07

Subtask 27-84-61-220-065
P. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 1
|(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| B
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 3
|(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-066
Q. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 614
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 17.966 | 17.984 |
|
| 17.939 |
|
|
| OD 14 |(0.7073) |(0.7080) |
|
|(0.7062) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 18.006 | 18.024 |
|
|
| 18.051 |
|
| ID 6
|(0.7088) |(0.7096) |
|
|
|(0.7106) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-067
R. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 22.189 | 22.210 |
|
| 22.176 |
|
|
| OD 11 |(0.8735) |(0.8744) |
|
|(0.8730) |
|
|
|
|
|
| 0.002 | 0.036 |
|
| 0.062 |
|
|
|
| (0.0000*| (0.0014*|
|
|(0.0024*|
| B
| 22.212 | 22.225 |
|
|
| 22.238 |
|
| ID 5
|(0.8744) |(0.8750) |
|
|
|(0.8755) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********



EFF :
ALL
 27-84-61


R 
AIJ




Page 615
Feb 01/07

Subtask 27-84-61-220-068
S. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 25.959 | 25.980 |
|
| 25.927 |
|
|
| OD 12 |(1.0220) |(1.0228) |
|
|(1.0207) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| B
| 26.007 | 26.028 |
|
|
| 26.060 |
|
| ID 9
|(1.0238) |(1.0247) |
|
|
|(1.0259) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-069
T. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 616
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 17.966 | 17.984 |
|
| 17.943 |
|
|
| OD 14 |(0.7073) |(0.7080) |
|
|(0.7064) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| B
| 18.000 | 18.018 |
|
|
| 18.041 |
|
| ID 10 |(0.7086) |(0.7093) |
|
|
|(0.7102) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-070
U. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.978 |
|
|
| OD 20 |(0.7483) |(0.7492) |
|
|(0.7471) |
|
|
|
|
|
| 0.020 | 0.074 |
|
| 0.136 |
|
|
|
| (0.0007)| (0.0029)|
|
|(0.0053)|
| C
| 19.050 | 19.083 |
|
|
| 19.114 |
|
| ID 23 |(0.7500) |(0.7512) |
|
|
|(0.7525) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61


R 
AIJ




Page 617
Feb 01/07

Subtask 27-84-61-220-071
V. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 22.959 | 22.980 |
|
| 22.932 |
|
|
| OD 23 |(0.9038) |(0.9047) |
|
|(0.9028) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.116 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0045)|
| C
| 23.000 | 23.021 |
|
|
| 23.048 |
|
| ID 19 |(0.9055) |(0.9063) |
|
|
|(0.9074) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-072
W. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-61


R 
AIJ




Page 618
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.993 |
|
|
| OD 20 |(0.7483) |(0.7492) |
|
|(0.7477) |
|
|
|
|
|
| 0.007 | 0.041 |
|
| 0.073 |
|
|
|
| (0.0002)| (0.0016)|
|
|(0.0028)|
| C
| 19.037 | 19.050 |
|
|
| 19.066 |
|
| ID 22 |(0.7494) |(0.7500) |
|
|
|(0.7506) |
|
------------------------------------------------------------------------------Subtask 27-84-61-220-073
X. Dimensional Check of the Slat-to-Track Attachment Fittings, Track 1 thru
4
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 19.009 | 19.030 |
|
| 18.982 |
|
|
| OD 20 |(0.7483) |(0.7492) |
|
|(0.7473) |
|
|
|
|
|
| 0.020 | 0.062 |
|
| 0.116 |
|
|
|
| (0.0007)| (0.0024)|
|
|(0.0045)|
| C
| 19.050 | 19.071 |
|
|
| 19.098 |
|
| ID 21 |(0.7500) |(0.7508) |
|
|
|(0.7518) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-61


R 
AIJ




Page 619
Feb 01/07

5. Close-up
________
Subtask 27-84-61-640-057
A. Application of Special Materials
(Ref. Fig. 601/TASK 27-84-61-991-007)
R
R

(1) For the Slat tracks 1 and 2, apply a layer of COMMON GREASE (Material
No. 04-024) or COMMON GREASE (Material No. 04-004) to:
- the bolts (9), (28), (31) and (32)
- the eccentric bush (27)
- the bushes (17) and (23)
- the bearings (8), (13) and (21).
Subtask 27-84-61-420-065
B. For the Slat tracks 1 and 2, Installation:
(1) Install the bolt (31), the adjustment link (22), the links (4) and
(10), the eccentric bush (27), the bolt (28), the washers (18) and
(19) and the nut (20). Tighten the nut (20) with your hand (this will
be safetied when the Slat No. 1 is installed).
(2) Install the bolt (32), the washer (15) and the nut (16). Tighten the
nut (16) with your hand (this will be safetied when the Slat No. 1 is
installed).
(3) Install the bolt (9), the washer (6) and the nut (7). Tighten the nut
(7) with your hand (this will be safetied when the Slat No. 1 is
installed).
NOTE : The bolts (1) and (33) and their related nuts and washers will
____
be correctly installed when the Slat No. 1 is installed.
Subtask 27-84-61-640-058
C. Application of Special Materials
(Ref. Fig. 602/TASK 27-84-61-991-008)

R
R

(1) For the Slat tracks 3 and 4, apply a layer of COMMON GREASE (Material
No. 04-024) or COMMON GREASE (Material No. 04-004) to:
- the bolts (14) and (17)
- the eccentric bush (13)
- the bearing (5).



EFF :
ALL
 27-84-61



AIJ




Page 620
Nov 01/08

Subtask 27-84-61-420-066
D. For the Slat Tracks 3 and 4, Installation:
(1) Put the bolt (17) in the link (18) and install the links (4) and
(18).
(2) Install the eccentric bush (13), the bolt (14), the washer (7) and
the nut (8). Tighten the nut (8) with your hand (this will be
safetied when the Slat No. 1 is installed).
NOTE : The bolts (1) and (20) and their related nuts and washers will
____
be correctly installed when the Slat No. 1 is installed.
(3) Install the applicable Slat track (Ref. TASK 27-84-61-400-004).
(4) Install the No. 1 Slat (Ref. TASK 27-84-63-400-002).
Subtask 27-84-61-942-057
E. Removal of Equipment
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-61


R 
AIJ




Page 621
Feb 01/07

TASK 27-84-61-200-002
Check of Slat 1 Trailing Edge Backlash
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

safety barriers
warning notice
adjustable access platform 3.5 m (11 ft. 6 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-80-00-866-005
27-84-61-991-009

Extending the Slats on the Ground


Retracting the Slats on the Ground
Fig. 603



EFF :
ALL
 27-84-61



AIJ




Page 622
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-61-941-054
A. Safety Precautions
(1) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.
(2) Put the safety barriers in position.
Subtask 27-84-61-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed on the slat/flap control lever.
(3) Put the adjustable access platform in position below the work area.
4. Procedure
_________
(Ref. Fig. 603/TASK 27-84-61-991-009)
Subtask 27-84-61-220-102
A. Check of the Slat 1 Trailing Edge Backlash
(1) For dimension X, at Tracks 1 thru 4, to check the slat knuckle
bearings backlash:
(a) Push the upper trailing edge of the slat down with a hand force
of 25 kg (55.1155 lb). Put the load at each track position, at
the trailing edge of the slat. Measure and write down the
dimension X.
(b) Pull the upper trailing edge of the slat up with a hand force of
25 kg (55.1155 lb). Put the load at each track position, at the
trailing edge of the slat. Measure and write down the dimension X
again.



EFF :
ALL
 27-84-61



AIJ




Page 623
Nov 01/08

R
R

Slat 1 - Trailing Edge Backlash


Figure 603/TASK 27-84-61-991-009



EFF :
ALL
 27-84-61



AIJ




Page 624
Feb 01/07

(c) Subtract the smaller dimension X from the larger dimension X to


give you the surface-attachment spherical-bearing backlash. The
difference between the two dimensions, that you wrote down, must
be no more than 2.5 mm (0.0984 in.).
(2) For dimension Y (tracks 2 and 3), to check the slat track drive
system backlash:
(a) Push the applicable track with a hand force of 25 kg (55.1155 lb)
aft. Measure and write down the dimension Y.
(b) Pull the applicable track with a hand force of 25 kg (55.1155 lb)
forward. Measure and write down the dimension Y again.
(c) Subtract the smaller dimension Y from the larger dimension Y to
give you the rotary-actuator/transmission-shafts backlash. The
difference between the two dimensions, that you wrote down, must
be no more than 3.0 mm (0.1181 in.).
5. Close-up
________
Subtask 27-84-61-860-057
A. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-61-942-054
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-61


R 
AIJ




Page 625
Feb 01/07

TRACK - SLAT 2, 3, 4, 5 - REMOVAL/INSTALLATION


______________________________________________
TASK 27-84-62-000-001
Removal of the Slat Tracks 5 thru 12
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
98D27804015000
98D27804016000

1
1
1
1

circuit breaker(s) safety clip(s)


adjustable access platform 3.5 m (11 ft. 6 in.)
SAFETY BARRIER(S)
WARNING NOTICE(S)
TOOL-BACKSTOP SLAT (TRACKS 5, 6, 7, AND 8)
TOOL-BACKSTOP SLAT (TRACKS 9, 10, 11, AND 12)



EFF :
ALL
 27-84-62



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-49-000-001
27-84-49-000-002
27-84-64-000-001
27-84-65-000-001
27-84-66-000-001
27-84-67-000-001
27-84-69-000-001
27-84-62-991-001

Removal of the Type B Actuators


6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Removal of the No. 2 Slat
Removal of the No. 3 Slat
Removal of the No. 4 Slat
Removal of the No. 5 Slat
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Fig. 401

3. __________
Job Set-up
Subtask 27-84-62-941-053
A. Safety Precautions
R

(1) Put the SAFETY BARRIER(S)S in position.

(2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-62-010-050
B. Get Access
(1) Put the adjustable access platform below the applicable zone 510 or
610.
(2) Remove the applicable closing plate(s) (Ref. TASK 27-84-69-000-001).
(3) Remove the applicable slat:
- for the tracks 5 and 6 (Ref. TASK 27-84-64-000-001)
- for the tracks 7 and 8 (Ref. TASK 27-84-65-000-001)
- for the tracks 9 and 10 (Ref. TASK 27-84-66-000-001)
- for the tracks 11 and 12 (Ref. TASK 27-84-67-000-001).



EFF :
ALL
 27-84-62



AIJ




Page 402
Nov 01/10

(4) Remove the applicable actuators:


- for the tracks 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-000-001)
- for the tracks 7, 9, and 11 (Ref. TASK 27-84-49-000-002).
(5) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-62-865-053
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-62-991-001)
Subtask 27-84-62-020-053
R

A. Removal of the Slat Tracks 5 thru 12


(1) Install the applicable TOOL-BACKSTOP SLAT (1) through the guide (4)
on the side of the track (2). Install the backstop tool on the
inboard side on the LH wing and on the outboard side on the RH wing:
- for the tracks 5 thru 8 install the TOOL-BACKSTOP SLAT (TRACKS 5,
6, 7, AND 8) (98D27804015000)
- for the tracks 9 thru 12 install the TOOL-BACKSTOP SLAT (TRACKS 9,
10, 11, AND 12) (98D27804016000).

R
R

NOTE : For the RH wing track 7, install the backstop tool on the
____
inboard side.
(2) Push the applicable slat backstop tool (1) against the rearstop (3)
to disengage it from the track stop. Pull the track (2) from its
installed position and remove it.
(3) Remove the applicable TOOL-BACKSTOP SLAT (1) from the track (2).



EFF :
ALL
 27-84-62



AIJ




Page 403
May 01/07

R
R

Slat Tracks 5 thru 12 - Location and Detail


Figure 401/TASK 27-84-62-991-001



EFF :
ALL
 27-84-62



AIJ




Page 404
Feb 01/07

TASK 27-84-62-400-001
Installation of the Slat Tracks 5 thru 12
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
98D27804015000
98D27804016000

safety barriers
warning notice(s)
adjustable access platform 3.5 m (11 ft. 6 in.)
1 TOOL-BACKSTOP SLAT (TRACKS 5, 6, 7, AND 8)
1 TOOL-BACKSTOP SLAT (TRACKS 9, 10, 11, AND 12)

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

Material No. 04-024


Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)



EFF :
ALL
 27-84-62



AIJ




Page 405
Nov 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-003
Material No. 19-010

USA AMS 3819


LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-004
27-84-49-000-001
27-84-49-000-002
27-84-49-400-001
27-84-49-400-002
27-84-64-000-001
27-84-64-400-002
27-84-65-000-001
27-84-65-400-002
27-84-66-000-001
27-84-66-400-002
27-84-67-000-001
27-84-67-400-002
27-84-68-400-001
27-84-69-000-001
27-84-69-400-001

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Installation of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Installation of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/ 6041CM(6091CM)
Removal of the No. 2 Slat
Installation of the No. 2 Slat
Removal of the No. 3 Slat
Installation of the No. 3 Slat
Removal of the No. 4 Slat
Installation of the No. 4 Slat
Removal of the No. 5 Slat
Installation of the No. 5 Slat
Installation of the Slat-Track Pinion Assembly
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Installation of the Closing Plates for the Slat
Tracks 1 thru 12



EFF :
ALL
 27-84-62


R 
AIJ




Page 406
Nov 01/08

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------32-00-00-481-001
R
R
R
R
R

27-84-62-991-001
27-84-62-991-002
27-84-62-991-003
27-84-62-991-007
27-84-62-991-017

Installation of the Safety Devices on the Landing


Gears
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-84-62-941-055
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the ground safety locks are installed on the landing
gear (Ref. TASK 32-00-00-481-001).
(3) Make sure that the warning notice(s) is in the cockpit to tell
persons not to operate the slat controls.
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER is
installed on the flap/slat control lever.
Subtask 27-84-62-865-050
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21



EFF :
ALL
 27-84-62



AIJ




Page 407
Feb 01/07

Subtask 27-84-62-860-051
C. Aircraft Maintenance Configuration
(1) Make sure that the adjustable access platform is below the applicable
zone 510 or 610.
(2) Make sure that the applicable closing plates have been removed
(Ref. TASK 27-84-69-000-001).
(3) Make sure
- for the
- for the
- for the
- for the

that
slat
slat
slat
slat

the applicable slats have been removed:


tracks 5 and 6 (Ref. TASK 27-84-64-000-001)
tracks 7 and 8 (Ref. TASK 27-84-65-000-001)
tracks 9 and 10 (Ref. TASK 27-84-66-000-001)
tracks 11 and 12 (Ref. TASK 27-84-67-000-001).

(4) Make sure that the applicable actuators have been removed:
- for the slat tracks 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-000-001)
- for the slat tracks 7, 9 and 11 (Ref. TASK 27-84-49-000-002).
4. Procedure
_________
Subtask 27-84-62-420-056
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Do a friction check on the applicable pinion(s) (Ref. TASK 27-84-68400-001).
(5) For the tracks 5 and 11, prepare the track for electrical bonding
(Ref. TASK 20-28-00-912-004).



EFF :
ALL
 27-84-62


R 
AIJ




Page 408
Feb 01/07

Subtask 27-84-62-420-050
R

B. Installation of the Slat Tracks 5 thru 12


(Ref. Fig. 401/TASK 27-84-62-991-001)
(1) Install the applicable TOOL-BACKSTOP SLAT (1) through the guide (4),
on the side of the track (2). Install the backstop tool on the
inboard side on the LH wing and on the outboard side on the RH wing:
- for the tracks 5 thru 8 use the TOOL-BACKSTOP SLAT (TRACKS 5, 6, 7,
AND 8) (98D27804015000)
- for the tracks 9 thru 12 use the TOOL-BACKSTOP SLAT (TRACKS 9, 10,
11, AND 12) (98D27804016000).

R
R

NOTE : For the RH wing track 7, install the backstop tool on the
____
inboard side.
(2) Push and hold the rear stop (3) away from its locked position.
Install the track (2) into its correct location.
(3) Release the rear stop (3) and make sure that it is correctly engaged
in its locked position.
(4) Remove the applicable TOOL-BACKSTOP SLAT (1).
(5) For the track(s) 5 and 11, do the electrical bonding test (Ref. TASK
20-28-00-869-002).
(6) Do a check of the position of the side rollers.
(Ref. Fig. 402/TASK 27-84-62-991-002)
(a) Move the applicable track (2) through its full range of travel
and make sure that:
- the side-rollers (20) touch the track (2) at some point of its
travel
- the points that touch do not stop the smooth travel of the
track (2).
Subtask 27-84-62-820-051
C. Adjustment of the Non-datum Side Rollers
(Ref. Fig. 402/TASK 27-84-62-991-002)
NOTE : The non-datum side-rollers are those installed on the:
____
- outboard rib for the left wing
- inboard rib for the right wing.
(1) For tracks 8 and 11, where applicable, remove and discard the
lockwire from the bolts (21).



EFF :
ALL
 27-84-62



AIJ




Page 409
May 01/07

R
R

Side Rollers and Vertical Rollers - Detail and Location


Figure 402/TASK 27-84-62-991-002



EFF :
ALL
 27-84-62



AIJ




Page 410
Feb 01/07

(2) Remove the bolts (21), the washers (22), the side rollers (20) and
the shims (23).
(3) Adjust the thickness of the shims (23) as follows:
- to reduce the friction, increase the thickness of the shims (23) as
necessary
- to make sure that the side-rollers (20) touch the track (2) at some
point of its travel, decrease the thickness of the shims (23) as
necessary.
(4) On the tracks 5 and 11, prepare the side-rollers (20) for electrical
bonding (Ref. TASK 20-28-00-912-004).
(5) On the tracks 6 thru 10 and 12, apply a thin layer of COMMON GREASE
(Material No. 04-024) on the side-rollers (20) and the shims (23).
(6) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (21).
(7) Put the shims (23) and the side-rollers (20) in position.
(8) Install the shims (23) and the side-rollers (20) with the washers
(22) and the bolts (21).
(9) Do the procedure again, as necessary, until the adjustment of the
side-roller(s) (20), is correct.
(10) For tracks 8 and 11, where applicable, safety the bolts (21) with
MISCELLANEOUS (Material No. 19-010).
(11) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (21), the washers (22) and the shims (23).
Subtask 27-84-62-220-144
D. Check the Position of the Top, Forward and Vertical Roller
(Ref. Fig. 402/TASK 27-84-62-991-002, 403/TASK 27-84-62-991-003)

(1) Move the applicable track (2) through its full range of travel and
make sure that:
- the smooth travel of the track (2) is not stopped by high points
that touch between the track (2) and the vertical roller (15)
- the dimension Z between the track (2) and the top, forward,
vertical-roller (15) is never more than 0.25 mm (0.0098 in.).



EFF :
ALL
 27-84-62



AIJ




Page 411
Feb 01/07

Slat-Track Rigging-Dimensions
Figure 403/TASK 27-84-62-991-003



EFF :
ALL
 27-84-62



AIJ




Page 412
Nov 01/10

(2) With the track (2) held against the two, top, vertical-rollers (15),
move the track (2) through its full range of travel. Make sure that
where the bottom, aft, vertical-roller (15) and the track (2) do not
touch, the clearance is not more than 0.25 mm (0.0098 in.).
(3) Adjust the top, aft, vertical-roller (15) if:
- the friction load is more than 6.5 daN (14.6125 lbf)
and/or
- the clearance is more than 0.25 mm (0.0098 in.).
Subtask 27-84-62-820-052
E. Adjustment of the Top, Forward and Vertical Roller
(Ref. Fig. 402/TASK 27-84-62-991-002, 403/TASK 27-84-62-991-003)

(1) Remove and discard the lockwire from the bolt (19).
(2) Remove the bolt (19), the locking ring (18) and the locking plate
(17).
(3) Turn the eccentric bush (16) until the top, forward, vertical-roller
(15) touches the track (2).
(4) Move the track (2) through its full range of travel. Stop the track
(2) at the point of maximum load between the track (2) and the top,
forward, vertical-roller (15). Then turn the eccentric bush (16) to
get a clearance of less than 0.038 mm (0.0014 in.) between the track
(2) and the vertical roller (15) (Dim Z).
(5) Move the track (2) through its full range of travel. Make sure that
the maximum clearance between the track (2) and the top, forward,
vertical-roller (15) is never more than 0.25 mm (0.0098 in.).
(6) Do the procedure again, as necessary, until the adjustment of the
top, forward, vertical-roller (15) is correct.
(7) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shank of the bolt (19).
(8) Install the locking plate (17) and the locking ring (18) with the
bolt (19).
(9) Safety the bolt (19) with MISCELLANEOUS (Material No. 19-010).
(10) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
locking plate (17), the locking ring (18) and the bolt (19).



EFF :
ALL
 27-84-62



AIJ




Page 413
Feb 01/07

Subtask 27-84-62-220-145
F. Check of the Position of the Top, Aft and Vertical Roller
(Ref. Fig. 402/TASK 27-84-62-991-002, 403/TASK 27-84-62-991-003)

(1) Do this friction load check and make sure that the friction load is
not more than 6.5 daN (14.6125 lbf):
(a) Attach a spring gage to the applicable track (2).
NOTE : During this check keep the spring gage in the
____
line-of-travel of the track (2).
(b) Use the spring gage to move the track (2) from its fully extended
position to fully retracted position. Monitor the spring gage and
make a note of the maximum value shown.
(c) Use the spring gage to extend the track (2) to its fully extended
position:
- if the spring gage pulls the track (2), write down the maximum
value shown
- if the track (2) extends by its weight and the spring gage
holds it back, write down the minimum value shown.
(d) Calculate the friction load as follows:
- for two maximum values, the friction load is the sum of the two
values
- for one maximum value and one minimum value, the friction load
is the difference of the two values.
(2) With the track (2) held against the two, top, vertical-rollers (19),
move the track (2) through its full range of travel. Make sure that
where the bottom, aft, vertical-roller and the track (2) do not
touch, the clearance is not more than 0.25 mm (0.0098 in.).
(3) Adjust the top, aft, vertical-roller (15) if:
- the friction load is more than 6.5 daN (14.6125 lbf)
and/or
- the clearance is more than 0.25 mm (0.0098 in.) (Dim Y).



EFF :
ALL
 27-84-62



AIJ




Page 414
Feb 01/07

Subtask 27-84-62-820-054
G. Adjustment of the Top, Aft and Vertical Roller
(Ref. Fig. 402/TASK 27-84-62-991-002)

(1) Remove and discard the lockwire from the bolt (19).
(2) Remove the bolt (19), the locking ring (18) and the locking plate
(17).
(3) Move the applicable track (2) through its full range of travel.
Adjust the eccentric bush (16) until the top, aft, vertical-roller
(15) touches the track (2) at its highest point.
(4) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shank of the bolt (19).
(5) Install the locking plate (17) and the locking ring (18) with the
bolt (19).
(6) Safety the bolt (19) with MISCELLANEOUS (Material No. 19-010).
(7) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
locking plate (17), the locking ring (18) and the bolt (19).
Subtask 27-84-62-820-055
H. Adjustment of the Front Stop (Tracks 6, 7, 8, 9, 10 and 12)
(Ref. Fig. 402/TASK 27-84-62-991-002, 404/TASK 27-84-62-991-007)

(1) Remove and discard the lockwire from the applicable bolts (55).
(2) Remove the bolts (55) and the applicable front stop (54).
(3) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (55).
(4) Loosely assemble the applicable front stop (54) with the bolts (55).
(5) For tracks 5 and 11, prepare the slat track (2) for electrical
bonding (Ref. TASK 20-28-00-912-004).
(6) Put and hold the track (2) in its fully retracted position.
(7) Put the front stop (54) in position so that it is parallel with the
bottom, forward, vertical-roller (15).



EFF :
ALL
 27-84-62



AIJ




Page 415
Feb 01/07

R
R

Slat-Track End-Stop - Location and Detail


Figure 404/TASK 27-84-62-991-007



EFF :
ALL
 27-84-62



AIJ




Page 416
Feb 01/07

(8) Tighten the bolts (55).


(9) Safety the bolts (55) with MISCELLANEOUS (Material No. 19-010).
(10) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (55).
Subtask 27-84-62-220-143
J. Check of the clearance at the track(s) 5 and 9.
(Ref. Fig. 405/TASK 27-84-62-991-017)

(1) Do a check of the clearance at the track (5) and 9:


(a) Measure the DIM. X (between the slat track arm and the closing
rib structure), this must be a minimum of 0.5 mm (0.0196 in.).
5. ________
Close up
R

(Ref. Fig. 402/TASK 27-84-62-991-002)


Subtask 27-84-62-640-050
A. Lubrication
(1) Lubricate the side-rollers (20) and the top and the bottom
vertical-rollers (15) with COMMON GREASE (Material No. 04-024).
Subtask 27-84-62-410-050
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable actuators:
- for track 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-400-001)
- for tracks 7, 9 and 11 (Ref. TASK 27-84-49-400-002).
(3) Install the applicable slat:
- for tracks 5 and 6 (Ref. TASK 27-84-64-400-002)
- for tracks 7 and 8 (Ref. TASK 27-84-65-400-002)
- for tracks 9 and 10 (Ref. TASK 27-84-66-400-002)
- for tracks 11 and 12 (Ref. TASK 27-84-67-400-002).
(4) Install the applicable closing plate(s) (Ref. TASK 27-84-69-400-001).



EFF :
ALL
 27-84-62



AIJ




Page 417
Feb 01/07

R
R

Slat Tracks 5 and 9 - Clearance Dimensions


Figure 405/TASK 27-84-62-991-017



EFF :
ALL
 27-84-62



AIJ




Page 418
Feb 01/07

Subtask 27-84-62-865-054
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-62-942-050
D. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-62


R 
AIJ




Page 419
Feb 01/07

TASK 27-84-62-000-002
Removal of the Side Rollers - Slat Tracks 5 thru 12
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No

specific
specific
specific
specific

circuit breaker(s) safety clip(s)


safety barriers
warning notice(s)
adjustable access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-49-000-001
27-84-49-000-002
27-84-61-000-001
27-84-64-000-001
27-84-65-000-001
27-84-66-000-001
27-84-67-000-001

Removal of the Type B Actuators


6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Removal of the Slat Tracks 1 thru 4
Removal of the No. 2 Slat
Removal of the No. 3 Slat
Removal of the No. 4 Slat
Removal of the No. 5 Slat



EFF :
ALL
 27-84-62



AIJ




Page 420
Feb 01/07

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

27-84-62-991-002

Fig. 402

3. __________
Job Set-up
R

(Ref. Fig. 402/TASK 27-84-62-991-002)


Subtask 27-84-62-941-054
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice(s) in the cockpit to tell persons not to operate
the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-62-865-052
B. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-62-010-051
C. Get Access
(1) Put an adjustable access platform below the applicable zone 510 or
610.
(2) Remove the applicable slat:
- for track 5 and 6 side-rollers (Ref. TASK 27-84-64-000-001)
- for track 7 and 8 side-rollers (Ref. TASK 27-84-65-000-001)
- for track 9 and 10 side-rollers (Ref. TASK 27-84-66-000-001)
- for track 11 and 12 side-rollers (Ref. TASK 27-84-67-000-001).



EFF :
ALL
 27-84-62



AIJ




Page 421
Feb 01/07

(3) Remove the applicable actuators:


- for tracks 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-000-001)
- for tracks 7, 9 and 11 (Ref. TASK 27-84-49-000-002).
(4) When it is necessary to remove all the side-rollers (20), remove the
applicable track (2) (Ref. TASK 27-84-61-000-001).
NOTE : To replace two or more side-rollers from opposite sides of the
____
track, you must remove all the side-rollers. Keep the
serviceable side-rollers and their related shims together for
the installation.
To replace side-rollers at the same side of the track, remove
only the side-rollers you are to replace.
(5) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
4. Procedure
_________
Subtask 27-84-62-020-051
A. Removal of the Side Rollers - Slat Tracks 5 thru 12
(1) For tracks 8 and 11, where applicable, remove and discard the
lockwire from the bolts (21).
(2) Remove the bolts (21), the washers (22), the applicable
side-roller(s) (20) and the shims (23).



EFF :
ALL
 27-84-62


R 
AIJ




Page 422
Feb 01/07

TASK 27-84-62-400-002
Installation of the Side Rollers - Slat Tracks 5 thru 12
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R

No specific
No specific
No specific
No specific
98D27804021000

safety barriers
warning notice(s)
adjustable access platform 3.5 m (11 ft. 6 in.)
1 MICROMETER - EXTERNAL
1 GAUGE-SLAT TRACK SETTING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-024
Material No. 09-018
Material No. 09-019
Material No. 11-026
Material No. 15-007

SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM


(Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)



EFF :
ALL
 27-84-62



AIJ




Page 423
Aug 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-003
Material No. 19-010

USA AMS 3819


LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-869-002
20-28-00-912-004
27-84-49-000-001
27-84-49-000-002
27-84-49-400-001
27-84-49-400-002
27-84-61-000-002
27-84-62-400-001
27-84-64-000-001
27-84-64-400-002
27-84-65-000-001
27-84-65-400-002
27-84-66-000-001
27-84-66-400-002
27-84-67-000-001
27-84-67-400-002
27-84-62-991-002
27-84-62-991-004

Table of the Maximum Permitted Resistance Values


Electrical Bonding of Components With Conductive
Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Removal of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Installation of the Type B Actuators
6027CM(6077CM)/6029CM(6079CM)/6035CM
(6085CM)/6039CM(6089CM)/6045CM(6095CM)
Installation of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/ 6041CM(6091CM)
Removal of the Side-Rollers - Slat Tracks 1 thru 4
Installation of the Slat Tracks 5 thru 12
Removal of the No. 2 Slat
Installation of the No. 2 Slat
Removal of the No. 3 Slat
Installation of the No. 3 Slat
Removal of the No. 4 Slat
Installation of the No. 4 Slat
Removal of the No. 5 Slat
Installation of the No. 5 Slat
Fig. 402
Fig. 406



EFF :
ALL
 27-84-62


R 
AIJ




Page 424
Nov 01/08

3. __________
Job Set-up
Subtask 27-84-62-941-056
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) is in the cockpit to tell
persons not to operate the slat controls.
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the slat/flap control lever.
Subtask 27-84-62-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-62-860-052
C. Aircraft Maintenance Configuration
(1) Make sure that the adjustable access platform is below the applicable
zone 510 or 610.
(2) Make sure that the applicable slats have been removed:
- for track 5 and 6 side-rollers (Ref. TASK 27-84-64-000-001)
- for track 7 and 8 side-rollers (Ref. TASK 27-84-65-000-001)
- for track 9 and 10 side-rollers (Ref. TASK 27-84-66-000-001)
- for track 11 and 12 side-rollers (Ref. TASK 27-84-67-000-001).
(3) Make sure that the applicable actuators have been removed:
- for tracks 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-000-001)
- for tracks 7, 9 and 11 (Ref. TASK 27-84-49-000-002).
(4) Make sure that the applicable side rollers have been removed
(Ref. TASK 27-84-61-000-002).



EFF :
ALL
 27-84-62


R 
AIJ




Page 425
Feb 01/07

4. Procedure
_________
R

(Ref. Fig. 402/TASK 27-84-62-991-002, 406/TASK 27-84-62-991-004)


Subtask 27-84-62-420-057
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Set the Track Datum use the GAUGE-SLAT TRACK SETTING (98D27804021000)
as follows:
NOTE : This procedure is only necessary where all the side rollers
____
are removed.
(a) Install the applicable setting track (35).
(b) Install and lock the two clamp assemblies (36) at the locations
of the non-datum side-rollers.
(c) Turn the thumb screws (37) equally until they stop.
(d) Install the gage assembly (40) with the washers (22) and the
bolts (21) at the location of the aft datum side-roller.
(e) Turn the torque screw (38) on the gage assembly (40) until it
stops. Lock it in position with the thumb screw (39).
(5) To calculate the thickness of the datum side-roller shims (23):
NOTE : This procedure is only necessary where all the side rollers
____
are removed.
(a) Remove the bolts (21), the washers (22) and the gage assembly
(40) from the location of the aft datum side-roller.
(b) Set the micrometer (42) on the gage block (44) to zero.



EFF :
ALL
 27-84-62



AIJ




Page 426
Feb 01/07

R
R

Slat Track 5 thru 12 - Zero Datum Tool


Figure 406/TASK 27-84-62-991-004



EFF :
ALL
 27-84-62



AIJ




Page 427
Feb 01/07

(c) Install the gage assembly (40) on the gage block (44) and lock it
in position with the clamps (41).
(d) Move the micrometer (42) in the gage block (44) until it touches
the gage assembly (40). Lock the micrometer (42) in position with
the screw (43).
(e) Remove the gage assembly (40) from the gage block (44).
(f) Install the serviceable datum side-roller (20) on the gage block
(44) and lock it in position with the clamps (41).
(g) Adjust the micrometer (42) until it touches the datum side-roller
(20). Write down the dimension shown on the micrometer (42).
R

(h) Use an MICROMETER - EXTERNAL to calculate the dimensions for the


shims (23) from the data written down.
(i) Remove the datum side-roller (20) from the gage block (44).
(j) Keep the side-roller (20) and its shims (23) together.
(k) Do the procedure again for the forward datum side-roller.
(6) Remove the clamp assemblies (36) and the setting track (35).
Subtask 27-84-62-420-051
B. Installation of the Datum Side-Rollers
NOTE : This procedure is only necessary where all the side-rollers are
____
removed.
(1) For tracks 5 and 11, prepare the aft datum side-roller (20) for
electrical bonding (Ref. TASK 20-28-00-912-004).
(2) For tracks 6, 7, 8, 9, 10 and 12, apply a thin layer of COMMON GREASE
(Material No. 04-024) to the interface of the datum side-rollers (20)
and the shims (23).
(3) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (21).
(4) Put the necessary thickness of shims (23) and the aft datum
side-roller (20) in position.



EFF :
ALL
 27-84-62



AIJ




Page 428
Aug 01/11

(5) Install the shims (23) and the aft datum side-roller (20) with the
washers (22) and the bolts (21).
(6) For tracks 8 and 11, where applicable, safety the bolts (21) with
MISCELLANEOUS (Material No. 19-010).
(7) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (21), the washers (22) and the shims (23).
(8) Do the procedure again for the front datum side-roller (20).
(9) If removed, install the applicable slat track (2) (Ref. TASK 27-8462-400-001).
Subtask 27-84-62-420-052
C. Installation of One Side-Roller or a Pair on the Same Side
(1) For tracks 5 and 11, prepare the side-roller(s) (20) for electrical
bonding (Ref. TASK 20-28-00-912-004).
(2) For tracks 6, 7, 8, 9, 10 and 12, apply a thin layer of COMMON GREASE
(Material No. 04-024) to the interface of the side-roller(s) (20) and
the shims (23).
(3) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS (Material
No. 09-019) to the shanks of the bolts (21).
(4) Put the shims (23) and the side-roller(s) (20) in position.
(5) Install the shims (23) and the side roller(s) (20) with the washers
(22) and the bolts (21).
Subtask 27-84-62-820-059
D. Adjustment of the Side Rollers
(1) Move the applicable track (2) through its full range of travel and
make sure that:
- the side-roller(s) (20) touch the track (2) at some point of its
travel
- the points that touch do not stop the smooth travel of the track
(2).



EFF :
ALL
 27-84-62


R 
AIJ




Page 429
Feb 01/07

(2) To adjust the side-roller(s):


(a) Remove the bolts (21), the washers (22), the side-roller(s) (20)
and the shims (23).
(b) Adjust the thickness of the shims (23):
- to reduce the friction, increase the thickness of the shims
(23)
- to make sure that the side-roller(s) (20) touch the track (2)
at some point of its travel, decrease the thickness of the
shims (23) as necessary.
(3) Install the shims (23) and the side-rollers (20) with the washers
(22) and bolts (21).
(4) Do the procedure again, as necessary, until the side-roller(s) (20)
adjustment is correct.
(5) For tracks 8 and 11, where applicable, safety the bolts (21) with
MISCELLANEOUS (Material No. 19-010).
(6) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to the
bolts (21), the washers (22) and the shims (23).
Subtask 27-84-62-912-057
E. Electrical Bonding Test
(1) For track 5 and 11, do the electrical bonding test (Ref. TASK 20-2800-869-002).
5. Close-up
________
Subtask 27-84-62-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable actuators:
- for tracks 5, 6, 8, 10 and 12 (Ref. TASK 27-84-49-400-001)
- for tracks 7, 9 and 11 (Ref. TASK 27-84-49-400-002).



EFF :
ALL
 27-84-62


R 
AIJ




Page 430
Feb 01/07

(3) Install the applicable slat:


- for tracks 5 and 6 (Ref. TASK 27-84-64-400-002)
- for tracks 7 and 8 (Ref. TASK 27-84-65-400-002)
- for tracks 9 and 10 (Ref. TASK 27-84-66-400-002)
- for tracks 11 and 12 (Ref. TASK 27-84-67-400-002).
Subtask 27-84-62-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-62-942-051
C. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-62


R 
AIJ




Page 431
Feb 01/07

TRACK - SLAT 2, 3, 4, 5 - INSPECTION/CHECK


__________________________________________
TASK 27-84-62-200-001
Dimensional Check of the Slat-To-Track Attachment Fittings, Tracks 5 Thru 12
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

safety barriers
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

Material No. 04-024


SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM
(Ref. 20-31-00)



EFF :
ALL
 27-84-62



AIJ




Page 601
Nov 01/09

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R

27-84-62-000-001
27-84-62-400-001
27-84-64-000-001
27-84-64-400-002
27-84-65-000-001
27-84-65-400-002
27-84-66-000-001
27-84-66-400-002
27-84-67-000-001
27-84-67-400-002
27-84-62-991-008
27-84-62-991-009
27-84-62-991-010
27-84-62-991-011
27-84-62-991-012
27-84-62-991-013
27-84-62-991-014
27-84-62-991-015

Removal of the Slat Tracks 5 thru 12


Installation of the Slat Tracks 5 thru 12
Removal of the No. 2 Slat
Installation of the No. 2 Slat
Removal of the No. 3 Slat
Installation of the No. 3 Slat
Removal of the No. 4 Slat
Installation of the No. 4 Slat
Removal of the No. 5 Slat
Installation of the No. 5 Slat
Fig. 601
Fig. 602
Fig. 603
Fig. 604
Fig. 605
Fig. 606
Fig. 607
Fig. 608

3. __________
Job Set-up
Subtask 27-84-62-941-052
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-62-010-052
B. Get Access
(1) Remove the applicable
- for the Slat tracks
84-64-000-001)
- for the Slat tracks
84-65-000-001)
- for the Slat tracks
84-66-000-001)

Slat:
5 and 6, remove the Slat No. 2 (Ref. TASK 277 and 8, remove the Slat No. 3 (Ref. TASK 279 and 10, remove the Slat No. 4 (Ref. TASK 27-



EFF :
ALL
 27-84-62



AIJ




Page 602
Feb 01/07

- for the Slat tracks 11 and 12, remove the Slat No. 5 (Ref. TASK 2784-67-000-001).
(2) Remove the applicable Slat track (Ref. TASK 27-84-62-000-001).
(3) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is on the flap/slat control lever on panel 114VU.
(4) For the Slat track 5, remove:
(Ref. Fig. 601/TASK 27-84-62-991-008)

(a) the nut (16), the locking plate (17), the nut (7), the washer
(6), the bolt (15) and the eccentric bush (14).
(b) the links (8) and (10) and the bolt (18).
NOTE : The bolts (1) and (19) and their related nuts and washers
____
were removed when the Slat No. 2 was removed.
(5) For the Slat track 6, remove:
(Ref. Fig. 602/TASK 27-84-62-991-009)

(a) the nuts (15), the washers (14), the bolts (18) and the two links
(16).
(b) the nut (21), the locking plate (19), the nut (13), the washer
(12), the bolt (4) and the eccentric bush (5).
(c) the links (9) and (11) and the bolt (20).
NOTE : The bolts (3) and their related nuts and washers were
____
removed when the Slat No. 2 was removed.
(6) For the Slat track 7, remove:
(Ref. Fig. 603/TASK 27-84-62-991-010)

(a) the nut (10), the locking plate (11), the nut (4), the washer
(5), the bolt (15) and the eccentric bush (6).
(b) the links (14) and (21) and the bolt (12).
NOTE : The bolts (3) and (16) and their related nuts and washers
____
were removed when the Slat No. 3 was removed.



EFF :
ALL
 27-84-62



AIJ




Page 603
Feb 01/07

R
R

Slat 2, Track 5 - Attachment Details


Figure 601/TASK 27-84-62-991-008



EFF :
ALL
 27-84-62



AIJ




Page 604
Feb 01/07

R
R

Slat 2, Track 6 - Attachment Details


Figure 602/TASK 27-84-62-991-009



EFF :
ALL
 27-84-62



AIJ




Page 605
Feb 01/07

R
R

Slat 3, Track 7 - Attachment Details


Figure 603/TASK 27-84-62-991-010



EFF :
ALL
 27-84-62



AIJ




Page 606
Feb 01/07

(7) For the Slat track 8, remove:


(Ref. Fig. 604/TASK 27-84-62-991-011)

(a) the nuts (17), the washers (16), the bolts (20) and the two links
(18).
(b) the nut (9), the locking plate (10), the nut (15), the washer
(14), the bolt (4) and the eccentric bush (5).
(c) the links (13) and (21) and the bolt (11).
NOTE : The bolts (3) and their related nuts and washers were
____
removed when the Slat No. 3 was removed.
(8) For the Slat track 9, remove:
(Ref. Fig. 605/TASK 27-84-62-991-012)

(a) the nut (14), the locking plate (15), the nut (4), the washer
(5), the bolt (13) and the eccentric bush (12).
(b) the links (6) and (8) and the bolt (16).
NOTE : The bolts (1) and (17) and their related nuts and washers
____
were removed when the Slat No. 4 was removed.
(9) For the Slat track 10, remove:
(Ref. Fig. 606/TASK 27-84-62-991-013)

(a) the nuts (17), the washers (16), the bolts (20) and the two links
(18).
(b) the nut (9), the locking plate (10), the nut (15), the washer
(14), the bolt (4) and the eccentric bush (5).
(c) the links (13) and (21) and the bolt (11).
NOTE : The bolts (3) and their related nuts and washers were
____
removed when the Slat No. 4 was removed.
(10) For the Slat track 11, remove:
(Ref. Fig. 607/TASK 27-84-62-991-014)

(a) the nut (10), the locking plate (9), the nut (5), the washer (6),
the bolt (12) and the eccentric bush (11).



EFF :
ALL
 27-84-62



AIJ




Page 607
Feb 01/07

R
R

Slat 3, Track 8 - Attachment Details


Figure 604/TASK 27-84-62-991-011



EFF :
ALL
 27-84-62



AIJ




Page 608
Feb 01/07

R
R

Slat 4, Track 9 - Attachment Details


Figure 605/TASK 27-84-62-991-012



EFF :
ALL
 27-84-62



AIJ




Page 609
Feb 01/07

R
R

Slat 4, Track 10 - Attachment Details


Figure 606/TASK 27-84-62-991-013



EFF :
ALL
 27-84-62



AIJ




Page 610
Feb 01/07

R
R

Slat 5, Track 11 - Attachment Details


Figure 607/TASK 27-84-62-991-014



EFF :
ALL
 27-84-62



AIJ




Page 611
Feb 01/07

(b) the links (4) and (16) and the bolt (8).
NOTE : The bolts (1) and (20) and their related nuts and washers
____
were removed when the Slat No. 5 was removed.
(11) For the Slat track 12, remove:
(Ref. Fig. 608/TASK 27-84-62-991-015)

(a) the nut (11), the washer (10) and the bolt (30).
(b) the nut (14), the washer (13), the bolt (29) and the links (8)
and (31).
(c) the nut (26), the locking plate (27), the nut (16), the washer
(17), the bolt (25) and the eccentric bush (24).
(d) the links (18) and (20) and the bolt (28).
NOTE : The bolts (5) and (6) and their related nuts and washers
____
were removed when the Slat No. 5 was removed.
4. Procedure
_________
R
R
R

(Ref. Fig. 601/TASK 27-84-62-991-008, 602/TASK 27-84-62-991-009, 603/TASK


27-84-62-991-010, 604/TASK 27-84-62-991-011, 605/TASK 27-84-62-991-012,
606/TASK 27-84-62-991-013, 607/TASK 27-84-62-991-014, 608/TASK 27-84-62-991015)
Subtask 27-84-62-220-051
A. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62



AIJ




Page 612
Feb 01/07

R
R

Slat 5, Track 12 - Attachment Details


Figure 608/TASK 27-84-62-991-015



EFF :
ALL
 27-84-62



AIJ




Page 613
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 1
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 2
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-052
B. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 1
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 3
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 614
Feb 01/07

Subtask 27-84-62-220-053
C. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.966 | 15.984 |
|
| 15.943 |
|
|
| OD 5
|(0.6285) |(0.6292) |
|
|(0.6276) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 16.000 | 16.018 |
|
|
| 16.041 |
|
| ID 4
|(0.6299) |(0.6306) |
|
|
|(0.6315) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-054
D. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 615
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.640 |
|
|
| OD 19 |(0.4986) |(0.4993) |
|
|(0.4976) |
|
|
|
|
|
| 0.016 | 0.061 |
|
| 0.113 |
|
|
|
| (0.0006)| (0.0024)|
|
|(0.0044)|
| C
| 12.700 | 12.727 |
|
|
| 12.753 |
|
| ID 5
|(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-055
E. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 19 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 21 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 616
Feb 01/07

Subtask 27-84-62-220-056
F. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 19 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 20 |(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-057
G. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 617
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 15 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 8
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-058
H. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 12 |(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 9
|(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 618
Feb 01/07

Subtask 27-84-62-220-059
J. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 13 |(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 10 |(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-060
K. Dimensional Check of Slat 2, Track 5
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 619
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 15 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 11 |(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-061
L. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 1
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 620
Feb 01/07

Subtask 27-84-62-220-062
M. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 2
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-063
N. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 621
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 18 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 16 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-064
P. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 18 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 17 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 622
Feb 01/07

Subtask 27-84-62-220-065
Q. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 11 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-066
R. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 623
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 7
|(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 10 |(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-067
S. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 6
|(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 9
|(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 624
Feb 01/07

Subtask 27-84-62-220-068
T. Dimensional Check of Slat 2, Track 6
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 8
|(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-069
U. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions.
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 625
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 1
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-070
V. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 2
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 626
Feb 01/07

Subtask 27-84-62-220-071
W. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.966 | 15.984 |
|
| 15.943 |
|
|
| OD 20 |(0.6285) |(0.6292) |
|
|(0.6276) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 16.000 | 16.018 |
|
|
| 16.041 |
|
| ID 19 |(0.6299) |(0.6306) |
|
|
|(0.6315) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-072
X. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 627
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.640 |
|
|
| OD 16 |(0.4986) |(0.4993) |
|
|(0.4976) |
|
|
|
|
|
| 0.016 | 0.061 |
|
| 0.113 |
|
|
|
| (0.0006)| (0.0024)|
|
|(0.0044)|
| C
| 12.700 | 12.727 |
|
|
| 12.753 |
|
| ID 20 |(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-073
Y. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 16 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 18 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 628
Feb 01/07

Subtask 27-84-62-220-074
Z. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 16 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 17 |(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-075
AA. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 629
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 15 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 14 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-076
AB. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 15 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 9
|(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 630
Feb 01/07

Subtask 27-84-62-220-077
AC. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 8
|(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 13 |(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-078
AD. Dimensional Check of Slat 3, Track 7
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 631
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 7
|(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 21 |(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-079
AE. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions.
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 2
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 632
Feb 01/07

Subtask 27-84-62-220-080
AF. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 1
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-081
AG. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 633
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 20 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 18 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-082
AH. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 20 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 19 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 634
Feb 01/07

Subtask 27-84-62-220-083
AJ. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 13 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-084
AK. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 635
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 7
|(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 12 |(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-085
AL. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 6
|(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 21 |(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 636
Feb 01/07

Subtask 27-84-62-220-086
AM. Dimensional Check of Slat 3, Track 8
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 8
|(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-087
AN. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 637
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 1
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 2
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-088
AP. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 1
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 3
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 638
Feb 01/07

Subtask 27-84-62-220-089
AQ. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.966 | 15.984 |
|
| 15.943 |
|
|
| OD 21 |(0.6285) |(0.6292) |
|
|(0.6276) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 16.000 | 16.018 |
|
|
| 16.041 |
|
| ID 20 |(0.6299) |(0.6306) |
|
|
|(0.6315) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-090
AR. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 639
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.640 |
|
|
| OD 17 |(0.4986) |(0.4993) |
|
|(0.4976) |
|
|
|
|
|
| 0.016 | 0.061 |
|
| 0.113 |
|
|
|
| (0.0006)| (0.0024)|
|
|(0.0044)|
| C
| 12.700 | 12.727 |
|
|
| 12.753 |
|
| ID 21 |(0.5000) |(0.5010) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-091
AS. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 17 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 19 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 640
Feb 01/07

Subtask 27-84-62-220-092
AT. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 17 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 18 |(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-093
AU. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 641
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 13 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 6
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-094
AV. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 10 |(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 7
|(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 642
Feb 01/07

Subtask 27-84-62-220-095
AW. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 11 |(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 8
|(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-096
AX. Dimensional Check of Slat 4, Track 9
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 643
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 13 |(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 9
|(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-097
AY. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 1
|(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 644
Feb 01/07

Subtask 27-84-62-220-098
AZ. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 3
|(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 2
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-099
BA. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 645
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 20 |(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 18 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-100
BB. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 20 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 19 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 646
Feb 01/07

Subtask 27-84-62-220-101
BC. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.639 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4975) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 12.706 | 12.724 |
|
|
| 12.751 |
|
| ID 13 |(0.5002) |(0.5009) |
|
|
|(0.5020) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-102
BD. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 647
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.836 | 15.854 |
|
| 15.820 |
|
|
| OD 7
|(0.6234) |(0.6241) |
|
|(0.6228) |
|
|
|
|
|
| 0.008 | 0.039 |
|
| 0.071 |
|
|
|
| (0.0003)| (0.0015)|
|
|(0.0027)|
| C
| 15.862 | 15.875 |
|
|
| 15.891 |
|
| ID 12 |(0.6244) |(0.6250) |
|
|
|(0.6256) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-103
BE. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 18.959 | 18.980 |
|
| 18.927 |
|
|
| OD 6
|(0.7464) |(0.7472) |
|
|(0.7451) |
|
|
|
|
|
| 0.027 | 0.069 |
|
| 0.133 |
|
|
|
| (0.0010)| (0.0027)|
|
|(0.0052)|
| C
| 19.007 | 19.028 |
|
|
| 19.060 |
|
| ID 21 |(0.7483) |(0.7491) |
|
|
|(0.7503) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 648
Feb 01/07

Subtask 27-84-62-220-104
BF. Dimensional Check of Slat 4, Track 10
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.643 |
|
|
| OD 4
|(0.4986) |(0.4993) |
|
|(0.4977) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.700 | 12.718 |
|
|
| 12.741 |
|
| ID 8
|(0.5000) |(0.5007) |
|
|
|(0.5016) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-105
BG. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 649
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.472 |
|
|
| OD 1
|(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.023 | 0.053 |
|
| 0.108 |
|
|
|
| (0.0009)| (0.0020)|
|
|(0.0042)|
| B
| 9.535 | 9.550 |
|
|
| 9.580 |
|
| ID 2
|(0.3753) |(0.3759) |
|
|
|(0.3771) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-106
BH. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.488 |
|
|
| OD 1
|(0.3738) |(0.3744) |
|
|(0.3735) |
|
|
|
|
|
| 0.000 | 0.028 |
|
| 0.046 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0018)|
| B
| 9.512 | 9.525 |
|
|
| 9.534 |
|
| ID 3
|(0.3744) |(0.3750) |
|
|
|(0.3753) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 650
Feb 01/07

Subtask 27-84-62-220-107
BJ. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.472 |
|
|
| OD 12 |(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.023 | 0.053 |
|
| 0.103 |
|
|
|
| (0.0009)| (0.0020)|
|
|(0.0040)|
| B
| 9.535 | 9.550 |
|
|
| 9.575 |
|
| ID 4
|(0.3753) |(0.3759) |
|
|
|(0.3769) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-108
BK. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 651
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 14 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| B
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 7
|(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-109
BL. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 15.966 | 15.984 |
|
| 15.939 |
|
|
| OD 13 |(0.6285) |(0.6292) |
|
|(0.6275) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| B
| 16.006 | 16.024 |
|
|
| 16.051 |
|
| ID 16 |(0.6301) |(0.6308) |
|
|
|(0.6319) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 652
Feb 01/07

Subtask 27-84-62-220-110
BM. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.478 |
|
|
| OD 12 |(0.3738) |(0.3744) |
|
|(0.3731) |
|
|
|
|
|
| 0.013 | 0.043 |
|
| 0.081 |
|
|
|
| (0.0005)| (0.0016)|
|
|(0.0031)|
| B
| 9.525 | 9.540 |
|
|
| 9.559 |
|
| ID 15 |(0.3750) |(0.3755) |
|
|
|(0.3763) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-111
BN. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 653
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.466 | 12.484 |
|
| 12.443 |
|
|
| OD 17 |(0.4907) |(0.4914) |
|
|(0.4898) |
|
|
|
|
|
| 0.016 | 0.052 |
|
| 0.098 |
|
|
|
| (0.0006)| (0.0020)|
|
|(0.0038)|
| C
| 12.500 | 12.518 |
|
|
| 12.541 |
|
| ID 18 |(0.4921) |(0.4928) |
|
|
|(0.4937) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-112
BP. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.473 |
|
|
| OD 20 |(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.018 | 0.055 |
|
| 0.103 |
|
|
|
| (0.0007)| (0.0021)|
|
|(0.0040)|
| C
| 9.530 | 9.552 |
|
|
| 9.576 |
|
| ID 17 |(0.3751) |(0.3760) |
|
|
|(0.3770) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 654
Feb 01/07

Subtask 27-84-62-220-113
BQ. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.489 |
|
|
| OD 20 |(0.3738) |(0.3744) |
|
|(0.3735) |
|
|
|
|
|
| 0.000 | 0.028 |
|
| 0.044 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0017)|
| C
| 9.512 | 9.525 |
|
|
| 9.533 |
|
| ID 21 |(0.3744) |(0.3750) |
|
|
|(0.3753) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-114
BR. Dimensional Check of Slat 5, Track 11
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 655
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.478 |
|
|
| OD 20 |(0.3738) |(0.3744) |
|
|(0.3731) |
|
|
|
|
|
| 0.013 | 0.043 |
|
| 0.081 |
|
|
|
| (0.0005)| (0.0016)|
|
|(0.0031)|
| C
| 9.525 | 9.540 |
|
|
| 9.559 |
|
| ID 19 |(0.3750) |(0.3755) |
|
|
|(0.3763) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-115
BS. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 11.079 | 11.097 |
|
| 11.062 |
|
|
| OD 6
|(0.4361) |(0.4368) |
|
|(0.4355) |
|
|
|
|
|
| -0.001 | 0.035 |
|
| 0.069 |
|
|
|
|-(0.0000*| (0.0013*|
|
|(0.0027*|
| B
| 11.096 | 11.114 |
|
|
| 11.131 |
|
| ID 2
|(0.4368) |(0.4375) |
|
|
|(0.4382) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********



EFF :
ALL
 27-84-62


R 
AIJ




Page 656
Feb 01/07

Subtask 27-84-62-220-116
BT. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 11.079 | 11.097 |
|
| 11.067 |
|
|
| OD 6
|(0.4361) |(0.4368) |
|
|(0.4357) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.058 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0022)|
| B
| 11.100 | 11.113 |
|
|
| 11.125 |
|
| ID 1
|(0.4370) |(0.4375) |
|
|
|(0.4379) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-117
BU. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 657
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.472 |
|
|
| OD 5
|(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.023 | 0.053 |
|
| 0.103 |
|
|
|
| (0.0009)| (0.0020)|
|
|(0.0040)|
| B
| 9.535 | 9.550 |
|
|
| 9.575 |
|
| ID 3
|(0.3753) |(0.3759) |
|
|
|(0.3769) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-118
BV. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| B
| 9.497 | 9.512 |
|
| 9.488 |
|
|
| OD 5
|(0.3738) |(0.3744) |
|
|(0.3735) |
|
|
|
|
|
| 0.000 | 0.028 |
|
| 0.046 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0018)|
| B
| 9.512 | 9.525 |
|
|
| 9.534 |
|
| ID 4
|(0.3744) |(0.3750) |
|
|
|(0.3753) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 658
Feb 01/07

Subtask 27-84-62-220-119
BW. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.472 |
|
|
| OD 30 |(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.023 | 0.053 |
|
| 0.103 |
|
|
|
| (0.0009)| (0.0020)|
|
|(0.0040)|
| C
| 9.535 | 9.550 |
|
|
| 9.575 |
|
| ID 9
|(0.3753) |(0.3759) |
|
|
|(0.3769) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-120
BX. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 659
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.488 |
|
|
| OD 30 |(0.3738) |(0.3744) |
|
|(0.3735) |
|
|
|
|
|
| 0.000 | 0.028 |
|
| 0.046 |
|
|
|
| (0.0000)| (0.0011)|
|
|(0.0018)|
| C
| 9.512 | 9.525 |
|
|
| 9.534 |
|
| ID 7
|(0.3744) |(0.3750) |
|
|
|(0.3753) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-121
BY. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 11.079 | 11.097 |
|
| 11.062 |
|
|
| OD 29 |(0.4361) |(0.4368) |
|
|(0.4355) |
|
|
|
|
|
| -0.001 | 0.035 |
|
| 0.069 |
|
|
|
|-(0.0000*| (0.0013*|
|
|(0.0027*|
| C
| 11.096 | 11.114 |
|
|
| 11.131 |
|
| ID 12 |(0.4368) |(0.4375) |
|
|
|(0.4382) |
|
**********
DIFFERENCE IN IN. MARKED BY A STAR IS TRUNCATED **********



EFF :
ALL
 27-84-62


R 
AIJ




Page 660
Feb 01/07

Subtask 27-84-62-220-122
BZ. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 11.079 | 11.097 |
|
| 11.064 |
|
|
| OD 29 |(0.4361) |(0.4368) |
|
|(0.4355) |
|
|
|
|
|
| 0.003 | 0.041 |
|
| 0.071 |
|
|
|
| (0.0001)| (0.0016)|
|
|(0.0027)|
| C
| 11.100 | 11.120 |
|
|
| 11.135 |
|
| ID 15 |(0.4370) |(0.4377) |
|
|
|(0.4383) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-123
CA. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 661
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.472 |
|
|
| OD 25 |(0.3738) |(0.3744) |
|
|(0.3729) |
|
|
|
|
|
| 0.023 | 0.053 |
|
| 0.103 |
|
|
|
| (0.0009)| (0.0020)|
|
|(0.0040)|
| C
| 9.535 | 9.550 |
|
|
| 9.575 |
|
| ID 18 |(0.3753) |(0.3759) |
|
|
|(0.3769) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-124
CB. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 12.666 | 12.684 |
|
| 12.653 |
|
|
| OD 22 |(0.4986) |(0.4993) |
|
|(0.4981) |
|
|
|
|
|
| 0.003 | 0.034 |
|
| 0.060 |
|
|
|
| (0.0001)| (0.0013)|
|
|(0.0023)|
| C
| 12.687 | 12.700 |
|
|
| 12.713 |
|
| ID 19 |(0.4994) |(0.5000) |
|
|
|(0.5005) |
|
-------------------------------------------------------------------------------



EFF :
ALL
 27-84-62


R 
AIJ




Page 662
Feb 01/07

Subtask 27-84-62-220-125
CC. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.
------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS
|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 15.966 | 15.984 |
|
| 15.939 |
|
|
| OD 23 |(0.6285) |(0.6292) |
|
|(0.6275) |
|
|
|
|
|
| 0.022 | 0.058 |
|
| 0.112 |
|
|
|
| (0.0008)| (0.0022)|
|
|(0.0044)|
| C
| 16.006 | 16.024 |
|
|
| 16.051 |
|
| ID 20 |(0.6301) |(0.6308) |
|
|
|(0.6319) |
|
------------------------------------------------------------------------------Subtask 27-84-62-220-126
CD. Dimensional Check of Slat 5, Track 12
(1) Fits and clearance dimensions
NOTE : The limits on the chrome-plated surfaces only apply when there
____
is a layer of chrome on the bearing surfaces.



EFF :
ALL
 27-84-62


R 
AIJ




Page 663
Feb 01/07

------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS


|
IN-SERVICE WEAR LIMITS |
| DETAIL |---------------------------------------|----------------------------|
| AND
|
DIMENSION
| ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX.
|
| ITEM
|
MM (IN.)
|
MM (IN.)
|
MM (IN.)
| ALLOW. |
| NO.
|-------------------|-------------------|---------|---------| CLEAR. |
|
|
MIN. |
MAX. |
MIN. |
MAX. |
MIN. |
MAX. |MM (IN.)|
|--------|---------|---------|---------|---------|---------|---------|--------|
| C
| 9.497 | 9.512 |
|
| 9.478 |
|
|
| OD 25 |(0.3738) |(0.3744) |
|
|(0.3731) |
|
|
|
|
|
| 0.013 | 0.043 |
|
| 0.081 |
|
|
|
| (0.0005)| (0.0016)|
|
|(0.0031)|
| C
| 9.525 | 9.540 |
|
|
| 9.559 |
|
| ID 21 |(0.3750) |(0.3755) |
|
|
|(0.3763) |
|
------------------------------------------------------------------------------5. Close-up
________
Subtask 27-84-62-410-053
A. Close Access
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(2) For the Slat track 5,
(Ref. Fig. 601/TASK 27-84-62-991-008)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (15) and (18)
- the eccentric bush (14)
- the bearing (9).

(3) For the Slat track 5


(a) Put the bolt (18) in the link (10) and install the links (8) and
(10).
(b) Install the eccentric bush (14), the bolt (15), the washer (6)
and the nut (7). Tighten the nut (7) with your hand (this will be
safetied when the Slat No. 2 is installed).
NOTE : The bolts (1) and (19) and their related nuts and washers
____
will be correctly installed when the Slat No. 2 is
installed.



EFF :
ALL
 27-84-62



AIJ




Page 664
Feb 01/07

(4) For the Slat track 6,


(Ref. Fig. 602/TASK 27-84-62-991-009)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (4), (18) and (20)
- the eccentric bush (5)
- the bearings (10) and (17).

(5) For the Slat track 6


(a) Put the bolt (20) in the link (9) and install the links (9) and
(11).
(b) Install the eccentric bush (5), the bolt (4), the washer (12) and
the nut (13). Tighten the nut (13) with your hand (this will be
safetied when the Slat No. 2 is installed).
(c) Install the two links (16), the bolts (18), the washers (14) and
the nuts (15). Tighten the nuts (15) with your hand (these will
be safetied when the Slat No. 2 is installed).
NOTE : The bolts (3) and their related nuts and washers will be
____
correctly installed when the Slat No. 2 is installed.
(6) For the Slat track 7,
(Ref. Fig. 603/TASK 27-84-62-991-010)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (12) and (15)
- the eccentric bush (6)
- the bearing (13).

(7) For the Slat track 7


(a) Put the bolt (12) in the link (21) and install the links (14) and
(21).
(b) Install the eccentric bush (6), the bolt (15), the washer (5) and
the nut (4). Tighten the nut (4) with your hand (this will be
safetied when the Slat No. 3 is installed).
NOTE : The bolts (3) and (16) and their related nuts and washers
____
will be correctly installed when the Slat No. 3 is
installed.



EFF :
ALL
 27-84-62



AIJ




Page 665
Feb 01/07

(8) For the Slat track 8,


(Ref. Fig. 604/TASK 27-84-62-991-011)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (4), (11) and (20)
- the eccentric bush (5)
- the bearings (12) and (19).

(9) For the Slat track 8


(a) Put the bolt (11) in the link (21) and install the links (13) and
(21).
(b) Install the eccentric bush (5), the bolt (4), the washer (14) and
the nut (15). Tighten the nut (15) with your hand (this will be
safetied when the Slat No. 3 is installed).
(c) Install the two links (18), the bolts (20), the washers (16) and
the nuts (17). Tighten the nuts (17) with your hand (these will
be safetied when the Slat No. 3 is installed).
NOTE : The bolts (3) and their related nuts and washers will be
____
correctly installed when the Slat No. 3 is installed.
(10) For the Slat track 9,
(Ref. Fig. 605/TASK 27-84-62-991-012)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (13) and (16)
- the eccentric bush (12)
- the bearing (7).

(11) For the Slat track 9


(a) Put the bolt (16) in the link (8) and install the links (6) and
(8).
(b) Install the eccentric bush (12), the bolt (13), the washer (5)
and the nut (4). Tighten the nut (4) with your hand (this will be
safetied when the Slat No. 4 is installed).
NOTE : The bolts (1) and (17) and their related nuts and washers
____
will be correctly installed when the Slat No. 4 is
installed.



EFF :
ALL
 27-84-62



AIJ




Page 666
Feb 01/07

(12) For the Slat track 10,


(Ref. Fig. 606/TASK 27-84-62-991-013)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (4), (11) and (20)
- the eccentric bush (5)
- the bearings (12) and (19).

(13) For the Slat track 10


(a) Put the bolt (11) in the link (21) and install the links (13) and
(21).
(b) Install the eccentric bush (5), the bolt (4), the washer (14) and
the nut (15). Tighten the nut (15) with your hand (this will be
safetied when the Slat No. 4 is installed).
(c) Install the two links (18), the bolts (20), the washers (16) and
the nuts (17). Tighten the nuts (17) with your hand (these will
be safetied when the Slat No. 4 is installed).
NOTE : The bolts (3) and their related nuts and washers will be
____
correctly installed when the Slat No. 4 is installed.
(14) For the Slat track 11,
(Ref. Fig. 607/TASK 27-84-62-991-014)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (8) and (12)
- the eccentric bush (11)
- the bearing (7).

(15) For the Slat track 11


(a) Put the bolt (8) in the link (16) and install the links (4) and
(16).
(b) Install the eccentric bush (11), the bolt (12), the washer (6)
and the nut (5). Tighten the nut (5) with your hand (this will be
safetied when the Slat No. 5 is installed).
NOTE : The bolts (1) and (20) and their related nuts and washers
____
will be correctly installed when the Slat No. 5 is
installed.



EFF :
ALL
 27-84-62



AIJ




Page 667
Feb 01/07

(16) For the Slat track 12,


(Ref. Fig. 608/TASK 27-84-62-991-015)
apply a layer of COMMON GREASE (Material No. 04-024) to:
- the bolts (25), (28), (29) and (30)
- the eccentric bush (24)
- the bearings (7), (15) and (19).

(17) For the Slat track 12


(a) Put the bolt (28) in the link (20) and install the links (18) and
(20).
(b) Install the eccentric bush (24), the bolt (25), the washer (17)
and the nut (16). Tighten the nut (16) with your hand (this will
be safetied when the Slat No. 5 is installed).
(c) Install the links (8) and (31), the bolt (29), the washer (13)
and the nut (14).
(d) Install the bolt (30), the washer (10) and the nut (11). Tighten
the nuts (14) and (11) with your hand (these will be safetied
when the Slat No. 5 is installed).
NOTE : The bolts (5) and (6) and their related nuts and washers
____
will be correctly installed when the Slat No. 5 is
installed.
(18) Install the applicable Slat track (Ref. TASK 27-84-62-400-001).
(19) Install the applicable Slat:
- for Slat tracks 5 and 6, install Slat No. 2 (Ref. TASK 27-84-64400-002)
- for Slat tracks 7 and 8, install Slat No. 3 (Ref. TASK 27-84-65400-002)
- for Slat tracks 9 and 10, install Slat No. 4 (Ref. TASK 27-84-66400-002)
- for Slat tracks 11 and 12, install Slat No. 5 (Ref. TASK 27-84-67400-002).
Subtask 27-84-62-942-053
B. Removal of Equipment
(1) Remove the safety barriers.
(2) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :
ALL
 27-84-62



AIJ




Page 668
Feb 01/07

(3) Remove the warning notice(s).


(4) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-62



AIJ




Page 669
Feb 01/07

TASK 27-84-62-200-002
Check of Slat 2, 3, 4 and 5 Trailing Edge Backlash
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific
No specific
No specific
98D27803000000

safety barriers
warning notice
adjustable access platform 3.5 m (11 ft. 6 in.)
1 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-80-00-866-005
27-84-62-991-016

Extending the Slats on the Ground


Retracting the Slats on the Ground
Fig. 609



EFF :
ALL
 27-84-62



AIJ




Page 670
Nov 01/09

3. __________
Job Set-up
Subtask 27-84-62-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-62-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
R
R

(2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
(98D27803000000) is installed on the slat/flap control lever.
(3) Put the adjustable access platform below the work area.
4. Procedure
_________
(Ref. Fig. 609/TASK 27-84-62-991-016)
Subtask 27-84-62-220-142
A. Check of Slat 2, 3, 4 and 5 Trailing Edge Backlash
(1) For dimension X, to check the slat knuckle bearings backlash:
(a) Push the upper trailing edge of the slat down with a hand force
of 25 kg (55.1155 lb). Put the load, at each track position, at
the trailing edge of the slat. Measure and write down the
dimension X.
(b) Pull the upper trailing edge of the slat up with a hand force of
25 kg (55.1155 lb). Put the load, at each track position, at the
trailing edge of the slat. Measure and write down the dimension X
again.



EFF :
ALL
 27-84-62



AIJ




Page 671
Nov 01/09

R
R

Slat 2, 3, 4 and 5 - Trailing Edge Backlash


Figure 609/TASK 27-84-62-991-016



EFF :
ALL
 27-84-62



AIJ




Page 672
Feb 01/07

(c) Subtract the smaller dimension X from the larger dimension X to


give you the surface-attachment spherical-bearing backlash. The
difference between the two dimensions, that you wrote down, must
be no more than 2.0 mm (0.0787 in.).
(2) For dimension Y (tracks 5 thru 12), to check the slat track drive
system backlash:
(a) Push the applicable track with a hand force of 25 kg (55.1155 lb)
aft. Measure and write down the dimension Y.
(b) Pull the applicable track with a hand force of 25 kg (55.1155 lb)
forward. Measure and write down the dimension Y again.
(c) Subtract the smaller dimension Y from the larger dimension Y to
give you the rotary-actuator/transmission-shafts backlash. The
difference between the two dimensions, that you wrote down, must
be no more than 2.5 mm (0.0984 in.).
5. Close-up
________
Subtask 27-84-62-860-054
A. Aircraft Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-62-942-052
B. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-62


R 
AIJ




Page 673
Feb 01/07

SLAT 1 - REMOVAL/INSTALLATION
_____________________________
TASK 27-84-63-000-001
Removal of the No. 1 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

circuit breaker(s) safety clip(s)


pneumatic wrench
safety barriers
support strut
warning notice

R
No specific
98D27803500001
98D27804001000

adjustable access platform 3.5 m (11 ft. 6 in.)


1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
1 ADAPTOR-DRIVE, SLAT (AND FLAP)



EFF :
ALL
 27-84-63



AIJ




Page 401
May 01/11

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-005
27-84-45-000-004
27-84-69-000-001
31-32-00-860-006
57-41-37-000-006
R
R
R
27-84-63-991-001
27-84-63-991-002
27-84-63-991-003

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Retracting the Slats on the Ground
Removal of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-84-63-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Fully retract the slats (Ref. TASK 27-80-00-866-005).
(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
(4) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.



EFF :
ALL
 27-84-63



AIJ




Page 402
Feb 01/11

Subtask 27-84-63-860-054
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM DATA - the MCDU shows the slat SYSTEM DATA
SLT>
submenu.
4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(4) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-84-63-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-63



AIJ




Page 403
Feb 01/11

Subtask 27-84-63-010-051
D. Get Access
(1) Put the adjustable access platform below the zone 510(610).
(2) Remove the applicable access panel (Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.
(3) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004):
- for the left wing, remove FIN 6010CM
- for the right wing, remove FIN 6060CM.
(4) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
R
R
R

(5) Install the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) and a


pneumatic wrench or a wrench and socket on the applicable bevel
gearbox:
- for the left wing, use FIN 6010CM
- for the right wing, use FIN 6060CM.
NOTE : This will let you operate the slats manually.
____
(6) Manually extend the slats to the fully extended position
(7) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(8) Remove the slat track closing plates (Ref. TASK 27-84-69-000-001).
Subtask 27-84-63-480-051
E. Installation of Support Equipment
(1) Install the SLATS - SLING (98D27804009001) (Ref. TASK 27-80-00-400001).



EFF :
ALL
 27-84-63



AIJ




Page 404
May 01/11

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-63-991-001, 402/TASK 27-84-63-991-002, 403/TASK
27-84-63-991-003)
Subtask 27-84-63-020-051
A. Removal of the No. 1 Slat
R

(1) Lift the SLATS - SLING sufficiently, until it has the weight of the
slat.
(2) Disconnect the slat-to-track bonding lead at the No. 1 Slat Track:
(a) Remove and discard the lockwire from the bolt (8).
(b) Remove the nut (1) and the bonding strap (2) from the bolt (8)
but do not remove the bolt (8). Install the nut (1) on the bolt
(8).
(3) At the No. 1 slat track:
(a) Remove and discard the cotter pins (5) from the nuts (18), (19),
and (20).
(b) Loosen the nuts (18), (19), and (20) but do not remove them.
(c) Remove and discard the cotter pins (5) from the nuts (4) and (6).
(d) Remove the items that follow:
- the nuts (4) and (6)
- the washers (3) and (7)
- the bolts (16) and (17).
(4) At the No. 2 slat track:
(a) Remove and discard the cotter pins (4) from the nuts (17), (18),
and (19).
(b) Loosen the nuts (17), (18), and (19) but do not remove them.
(c) Remove and discard the cotter pins (4) from the nuts (3) and (5).
(d) Remove:
- the nuts (3) and (5)
- the washers (2) and (6)
- the bolts (15) and (16).



EFF :
ALL
 27-84-63



AIJ




Page 405
Feb 01/08

Slat No. 1 - Location and General Configuration


Figure 401/TASK 27-84-63-991-001



EFF :
ALL
 27-84-63



AIJ




Page 406
Aug 01/09

INTENTIONALLY BLANK




 27-84-63



AIJ




Page 407
Feb 01/07

Slat Attachment at the No. 1 and 2 Slat Tracks


Figure 402/TASK 27-84-63-991-002- 12 (SHEET 1)



EFF :
ALL
 27-84-63



AIJ




Page 408
Aug 01/09

Slat Attachment at the No. 1 and 2 Slat Tracks


Figure 402/TASK 27-84-63-991-002- 22 (SHEET 2)



EFF :
ALL
 27-84-63



AIJ




Page 409
Aug 01/09

Slat Attachment at the Nos 3 and 4 Slat Tracks


Figure 403/TASK 27-84-63-991-003



EFF :
ALL
 27-84-63



AIJ




Page 410
May 01/10

(5) At the No. 3 and 4 slat tracks:


(a) Remove and discard the cotter pins (5) from the nuts (42).
(b) Loosen the nuts (42) but do not remove them.
(c) Remove and discard the cotter pins (5) from the nuts (31) and
(32).
(d) Remove:
- the nuts (31) and (32)
- the washers (30) and (33)
- the bolts (39) and (41)
- the bush (34).
(6) Lift the slat (41 kg (90.3895 lb)) from the slat tracks.
(7) Move the slat with the hoist and lower it onto the support strut.
Subtask 27-84-63-860-053
B. Removal of Support Equipment
R

(1) If you are to install a new slat, remove the SLATS - SLING (Ref. TASK
27-80-00-000-001).



EFF :
ALL
 27-84-63



AIJ




Page 411
Feb 01/08

TASK 27-84-63-400-002
Installation of the No. 1 Slat
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No
No
No
No
No

specific
specific
specific
specific
specific

98D27804001000
98D27804011000
98D27804020001

pneumatic wrench
safety barriers
warning notice(s)
adjustable access platform 3.5 m (11 ft. 6 in.)
Torque Wrench : range 0.67 to 13.50 m.daN
(4.94 to 99.57 lbf.ft)
1 ADAPTOR-DRIVE, SLAT (AND FLAP)
1 BAR-TURNING
1 BLOCK-SLAT GAPPING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-047
Material No. 09-001
Material No. 09-016

C
Z-11.904
ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II
CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)



EFF :
ALL
 27-84-63



AIJ




Page 412
Feb 01/11

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 11-026
Material No. 19-003
Material No. 19-010

GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R
R
R
R
R
R
R

4
4
4
4
5
5
5
5
5
5

cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter
cotter

pin
pins
pin
pins
pins
pins
pins
pins
pins
pins

27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61
27-84-61

02 -010
02 -010
02A-010
02A-010
01A-010
01B-010
03 -010
03A-010
04 -010
04A-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Ground Service Network from the External
Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling



EFF :
ALL
 27-84-63



AIJ




Page 413
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-400-001
27-80-00-866-004
27-84-00-710-001
27-84-45-000-004
27-84-45-400-005
27-84-69-000-001
27-84-69-400-001
57-41-37-000-006
R
R
R
57-41-37-400-006
R
R
R
27-84-63-991-001
27-84-63-991-002
27-84-63-991-003
27-84-63-991-005
27-84-63-991-004

Installation of the Hoisting Sling


Extending the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shaft 6010CM(6060CM)
Installation of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Installation of the Closing Plates for the Slat
Tracks 1 thru 12
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Installation of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522 KB(622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-84-63-941-053
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice(s) are in the cockpit to tell
persons not to operate the slat controls.



EFF :
ALL
 27-84-63



AIJ




Page 414
Feb 01/11

Subtask 27-84-63-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the adjustable access platform is below the applicable
zone 510(610):
(2) Make sure that the applicable access panel has been removed
(Ref. TASK 57-41-37-000-006):
- for the left wing, panel 522NB
- for the right wing, panel 622NB.
(3) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866004).
(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(5) For the No. 1 slat track:
(a) Make sure that the slat track closing plate (9) (Ref. TASK 27-8469-000-001) is removed.
(6) For the No. 2 slat track:
(a) Make sure that the slat track closing plate (8) (Ref. TASK 27-8469-000-001) is removed.
(7) For the No. 3 and 4 slat tracks:
(a) Make sure that the slat track closing plate (35) (Ref. TASK 2784-69-000-001) is removed.
(8) Make sure that the applicable torque shaft has been removed
(Ref. TASK 27-84-45-000-004).
(9) Make sure that the ADAPTOR-DRIVE, SLAT (AND FLAP) is installed on the
applicable bevel gearbox.
(10) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
outboard of the removed torque shaft (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-63


R 
AIJ




Page 415
May 01/10

Subtask 27-84-63-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
Subtask 27-84-63-420-051
A. Preparation for Installation
(Ref. Fig. 401/TASK 27-84-63-991-001, 402/TASK 27-84-63-991-002, 403/TASK
27-84-63-991-003, 404/TASK 27-84-63-991-005)
(1) Clean the component interface and/or the adjacent area with
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Clean the recess area of bolts using solvent and air dry.
(3) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047) to
the recess area of the bolts (51) and (54).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Install the SLATS - SLING (Ref. TASK 27-80-00-400-001).
(6) Loosen the bolts (51) and (54) and push the seals (52) and (55) into
the slat to the limit of their adjustment.
NOTE : This will give a clearance between the seals (52) and (55) and
____
the wing structure during the slat rigging procedure.
(7) Tighten the bolts (51) and (54) with your hand.
(8) At the No. 1 slat track remove:
- the nut (14)
- the locking plate (13).



EFF :
ALL
 27-84-63


R 
AIJ




Page 416
May 01/10

Slat Rigging - Detail


Figure 404/TASK 27-84-63-991-005


EFF :
ALL
 27-84-63


R 
AIJ




Page 417
May 01/10

(9) At the No. 2 slat track remove:


- the nut (13)
- the locking plate (12).
(10) At the No. 3 and 4 slat tracks remove:
- the nut (40)
- the locking plate (38).
Subtask 27-84-63-420-052
R

B. Installation of the No. 1 Slat


(Ref. Fig. 401/TASK 27-84-63-991-001, 402/TASK 27-84-63-991-002, 403/TASK
27-84-63-991-003)
(1) Lift the slat into position.
(2) At the No. 1 slat track:
(a) Clean the recess area of bolts using solvent and air dry.
(b) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047)
to the recess area of the bolts (16) and (17).
(c) Attach the slat to the slat tracks and the slat tracks links
with:
- the bolts (16) and (17)
- the washers (3) and (7)
- the nuts (4) and (6).
NOTE : If necessary, turn the eccentric bush (10) to help install
____
the bolts (16) and (17).
(d) TORQUE the nuts (4), (6), (18) and (20) to between 4.2 and 4.8
m.daN (30.97 and 35.39 lbf.ft).

R
R

(e) Safety the nuts (4), (6), (18) and (20) with the new cotter pins
(5).
(Ref. Fig. 405/TASK 27-84-63-991-004)
(f) Do not torque or safety the nut (19).
(3) At the No. 2 slat track:
(a) Attach the slat to the slat tracks and the slat tracks links
with:
- the bolts (15) and (16)
- the washers (2) and (6)



EFF :
ALL
 27-84-63



AIJ




Page 418
May 01/10

R
R

Slat Rigging - Detail


Figure 405/TASK 27-84-63-991-004



EFF :
ALL
 27-84-63



AIJ




Page 419
Feb 01/07

- the nuts (3) and (5).


NOTE : If necessary, turn the eccentric bushes (9) to help
____
install the bolts (15) and (16).
(b) TORQUE the nuts (3), (5), (17) and (19) to between 4.2 and 4.8
m.daN (30.97 and 35.39 lbf.ft).
R
R

(c) Safety the nuts (3), (5), (17) and (19) with the new cotter pins
(4).
(Ref. Fig. 405/TASK 27-84-63-991-004)
(d) Do not torque or safety the nut (18).
(4) At the No. 3 and 4 slat tracks:
CAUTION : MAKE SURE THAT THE APPLICABLE TYPE OF SLAT TRACK LINKS IS
_______
INSTALLED (ON TRACKS 1 AND 2) WHEN YOU REPLACE THE SLAT.
(a) Install the bush (34) and attach the slat to the slat tracks and
the slat tracks links with:
- the bolts (39) and (41)
- the washers (30) and (33)
- the nuts (31) and (32).
NOTE : If necessary, turn the eccentric bushes (36) to help
____
install the bolts (39) and (41).
(b) TORQUE the nuts (31) and (32) to between 6.6 and 7.6 m.daN (48.67
and 56.04 lbf.ft).

R
R

(c) Safety the nuts (31) and (32) with the new cotter pins (5) at the
No. 3 slat track and cotter pins (5) at the N0. 4 slat track.
(Ref. Fig. 405/TASK 27-84-63-991-004)
(d) Do not torque or safety the nut (42).
(5) Remove the SLATS - SLING (Ref. TASK 27-80-00-000-001).
(6) You must adjust the upper trailing-edge of the slat to its maximum
height, related to the fixed leading-edge. To adjust the height, turn
the eccentric bushes (9), (10) and (36) at the No. 1, 2, 3 and 4 slat
tracks.

R
R



EFF :
ALL
 27-84-63



AIJ




Page 420
May 01/10

Subtask 27-84-63-820-055
C. Adjustment of the Slat
(Ref. Fig. 401/TASK 27-84-63-991-001, 402/TASK 27-84-63-991-002, 403/TASK
27-84-63-991-003, 405/TASK 27-84-63-991-004)
(1) Install the BLOCK-SLAT GAPPING (98D27804020001) at the No. 9 slat
track.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(3) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) to retract the slats until
they are approximately 50.8 mm (2.0000 in.) +/- 6.35 mm (0.2500 in.)
from the BLOCK-SLAT GAPPING.
(4) Use the BAR-TURNING (98D27804011000) to slowly retract the slats
until the BLOCK-SLAT GAPPING touches the bottom roller at the No. 9
slat track.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(6) At the No. 1, 3 and 4 slat tracks:
(a) Adjust the eccentric bushes (10) and (36) to get dimension J.
Refer to the table that follows.
NOTE : Measure dimension J above the applicable slat track.
____

------------------------------------------------------------------------------| TRACK |
DIMENSION J
|
MAXIMUM ADJUSTMENT BECAUSE OF
|
| NO.
|
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------|
1
| 4.75 mm (0.187 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.) |
|--------|-----------------------|--------------------------------------------|
|
3
| 6.50 mm (0.255 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.) |
|--------|-----------------------|--------------------------------------------|
|
4
| 7.00 mm (0.275 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.) |
------------------------------------------------------------------------------(b) Install the locking plates (13) and (38) and the nuts (14) and
(40).
(c) TORQUE the nuts (19) and (42) to between 4.2 and 4.8 m.daN (30.97
and 35.39 lbf.ft).



EFF :
ALL
 27-84-63



AIJ




Page 421
Feb 01/11

R
R
R

(d) Safety the nuts (19) and (42) with the new cotter pins (5) at the
No. 1 slat track, cotter pins (5) at the No. 3 slat track and
cotter pins (5) at the No. 4 slat track.
(e) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed
outboard of the removed torque shaft FIN 6010CM(6060CM)
(Ref. TASK 27-50-00-000-003).
(f) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP)
to fully extend the slats.
(g) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400003).
(h) Apply special materials:
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER
_______
SPECIAL MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN
IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1
_

Apply SEALANTS (Material No. 09-001) to:


- the nuts (4), (6), (18), (19), (20), (31), (32) and (42)
- the bolt heads (11), (12), (15), (16), (17), (37), (39) and
(41)
- the locking plates (13) and (38).

(i) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.
(j) Install and adjust the closing plates (9) and (35) (Ref. TASK 2784-69-400-001).
(7) At the No. 2 slat track:
(a) Adjust the eccentric bush (9) to get dimension J. Refer to the
table that follows.
NOTE : Measure dimension J above the applicable slat track.
____



EFF :
ALL
 27-84-63



AIJ




Page 422
May 01/10

------------------------------------------------------------------------------| TRACK |
DIMENSION J
|
MAXIMUM ADJUSTMENT BECAUSE OF
|
| NO.
|
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------|
2
| 5.00 mm (0.196 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.) |
------------------------------------------------------------------------------(b) Install the locking plate (12) and the nut (13).
(c) TORQUE the nut (18) to between 4.2 and 4.8 m.daN (30.97 and 35.39
lbf.ft).
(d) Safety the nut (18) with the new cotter pin (4) at the No. 2 slat
track.
(e) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed
outboard of the removed torque shaft FIN 6010CM(6060CM)
(Ref. TASK 27-50-00-000-003).
(f) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP)
to fully extend the slats.
(g) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400003).
(h) Apply special materials:
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER
_______
SPECIAL MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN
IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
1
_

Apply
- the
- the
- the

SEALANTS (Material No. 09-001) to:


nuts (3), (5), (17), (18) and (19)
bolt heads (10), (11), (14), (15) and (16)
locking plate (12).

(i) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.



EFF :
ALL
 27-84-63



AIJ




Page 423
Feb 01/11

(j) Install and adjust the closing plate (8) (Ref. TASK 27-84-69-400001).
Subtask 27-84-63-820-059
D. Adjustment of the Seals after Installation of a New Slat
(Ref. Fig. 404/TASK 27-84-63-991-005)
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the screws (51) and (54), the washers (53), the support
assembly (56) and the seals (52) and (55).
(2) Apply a layer of SEALANTS (Material No. 09-016) to the screws (51)
and (54).
(3) While the sealant is still wet, install the seals (52) and (55) and
the support assemblies (53) and (56) with the screws (51) and (54)
and the washers (53). Tighten the screws (51) and (54) by hand.
(4) Adjust the seal (52) to touch the wing root over its full length.
(5) Adjust the seal (55) until the Dim S is 2 mm (0.0787 in.) +- 0.5 mm
(0.0196 in.) over its full length.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(7) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP)
(98D27804001000) to slowly manually retract the slats to the zero
position.
(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS), outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(9) Make sure that the seal (52) touches the wing root over its full
length.



R
EFF :
ALL
 27-84-63



AIJ




Page 424
May 01/10

(10) Make sure that there is still a clearance between the seal (55) and
the pylon structure over its full length.
(11) If the position of the seal(s) (52) and/or (55) is not correct, do
the adjustment procedure again.
(12) When the adjustment is correct, remove the LOCK-TORQUE SHAFT (FLAPS
AND SLATS), installed outboard of the removed torque shaft FIN
6010CM(6060CM) (Ref. TASK 27-50-00-000-003).
(13) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP)
(98D27804001000) to manually extend the slats to the fully extended
position.
(14) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(15) Fully tighten the screws (51) and (54).
Subtask 27-84-63-420-053
E. Connection of the Slat-To-Track Bonding Strap (Track 1)
(Ref. Fig. 402/TASK 27-84-63-991-002)
(1) Attach the bonding strap (2) with the bolt (8) and the nut (1)
(Ref. TASK 20-28-00-912-004).
(a) Safety the bolts (8) with MISCELLANEOUS (Material No. 19-010).
Subtask 27-84-63-860-052
F. Aircraft Maintenance Configuration
(1) Use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT (AND FLAP)
(98D27804001000) to manually retract the slats to the zero position.
(2) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(3) On the MCDU display, make sure that the PPU DATA page is shown (to
monitor the slats PPU position).
(4) If necessary, use the pneumatic wrench and the ADAPTOR-DRIVE, SLAT
(AND FLAP) to move the slat drive shaft until the PPU data shows the
same values as recorded in Para. 3.B.:
- the FPPU angle value must agree +/- 0.1 deg.
- the APPU angle value must agree +/- 0.1 deg.



EFF :
ALL
 27-84-63


R 
AIJ




Page 425
May 01/10

- the FPPU and APPU angles must agree +/- 1.3 deg.
- the LH APPU and the RH APPU angles must agree +/- 0.45 deg.
(5) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(6) Remove the ADAPTOR-DRIVE, SLAT (AND FLAP) and the pneumatic wrench
from the slat drive shaft.
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
Subtask 27-84-63-865-054
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV.
Subtask 27-84-63-410-053
H. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the safety collar on the circuit breakers 9CV and 11CV.
(3) Install the applicable torque shaft (Ref. TASK 27-84-45-400-005):
- for the left wing, install FIN 6010CM
- for the right wing, install FIN 6060CM.
(4) Install the applicable access panel (Ref. TASK 57-41-37-400-006):
- for the left wing, install 522NB
- for the right wing, install 622NB.
Subtask 27-84-63-710-051
J. Test
(1) The operational test of the slat system (Ref. TASK 27-84-00-710-001),
was done during the installation of the torque shaft FIN 6010CM
(6060CM).



EFF :
ALL
 27-84-63


R 
AIJ




Page 426
May 01/10

5. Close-up
________
Subtask 27-84-63-942-053
A. Removal of Equipment
(1) Remove ths safety barriers.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
slat/flap control lever on panel 114VU.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-63


R 
AIJ




Page 427
May 01/10

SLAT 2 - REMOVAL/INSTALLATION
_____________________________
TASK 27-84-64-000-001
Removal of the No. 2 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

circuit breaker(s) safety clip(s)

R
R
R
R
R

No specific
No specific
No specific
No specific
No specific
98D27803500001
98D27804001000

1
1
1
1
1
1

safety barriers
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
SUPPORT STRUCTURE - SLAT
WARNING NOTICE(S)
WRENCH - PNEUMATIC
TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
ADAPTOR-DRIVE, SLAT (AND FLAP)



EFF :
ALL
 27-84-64



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-005
27-84-45-000-004
27-84-69-000-001
31-32-00-860-006
57-41-37-000-006
R
R
R
27-84-64-991-002
27-84-64-991-003
27-84-64-991-001

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Retracting the Slats on the Ground
Removal of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-84-64-941-051
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Fully retract the slats (Ref. TASK 27-80-00-866-005).
R

(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER on the flap/slat
control lever on panel 114VU.

R
R

(4) Put a WARNING NOTICE(S) in position to tell persons not to operate


the



EFF :
ALL
 27-84-64



AIJ




Page 402
Nov 01/10

Subtask 27-84-64-860-053
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
R

------------------------------------------------------------------------------|
ACTION
|
RESULT
|
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM DATA - the MCDU shows the slat SYSTEM DATA
SLT>
submenu.
4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(4) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-84-64-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-64



AIJ




Page 403
Feb 01/11

Subtask 27-84-64-010-051
D. Get Access
R

(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
zone 510(610).
(2) Remove the applicable access panel (Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.
(3) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004):
- for the left wing remove FIN 6010CM
- for the right wing remove FIN 6060CM.
(4) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).

(5) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6101CM(6060CM) (Ref. TASK 27-50-00-400-003).
(7) Remove the slat closing plate (Ref. TASK 27-84-69-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-64-991-002, 402/TASK 27-84-64-991-003)
Subtask 27-84-64-020-051
A. Removal of the No. 2 Slat
(1) Disconnect the slat-to-track bonding strap at the No. 5 slat track:
(a) Remove the nut (16) and the bonding strap (17) from the bolt
(19), but do not remove the bolt. Install the nut (16) on the
bolt (19).
(2) Disconnect the slat-to-slat interfaces:
(Ref. Fig. 403/TASK 27-84-64-991-001)
(a) Remove the nut (4) and the bolt (6) then move the bonding strap
(5) away from the bonding tag.



EFF :
ALL
 27-84-64



AIJ




Page 404
Nov 01/10

R
R

Slat Attachment at the No. 5 Slat Track


Figure 401/TASK 27-84-64-991-002



EFF :
ALL
 27-84-64



AIJ




Page 405
Feb 01/07

R
R

Slat Attachment at the No. 6 Slat Track


Figure 402/TASK 27-84-64-991-003



EFF :
ALL
 27-84-64



AIJ




Page 406
Feb 01/07

R
R

Slat No. 2 - Location and General Configuration


Figure 403/TASK 27-84-64-991-001



EFF :
ALL
 27-84-64



AIJ




Page 407
Feb 01/07

(b) Remove the screws (1) and the stops (3).


(c) Remove the weather seal (2).
(3) Install the SLATS - SLING (Ref. TASK 27-80-00-400-001).
(4) Lift the SLATS - SLING sufficiently, until it has the weight of the
slat.
(5) At the Nos. 5 and 6 slat tracks:
(a) Remove and discard the cotter pins (23) from the nuts (32), (47),
(55) and (56).
(b) Loosen the nuts (32), (47), (55) and (56), but do not remove
them.
(c) Remove and discard the cotter pins (23) from the nuts (22), (24),
(49) and (51).
(d) Remove the items that follow:
- the nuts (22), (24), (49) and (51)
- the washers (21), (25), (48) and (50)
- the bolts (27), (30), (41) and (42)
- the bush (26).
NOTE : The bush (26) is a part of the slat track and the slat
____
track linkage assembly.
(6) Lift the slat (30 kg (66.1386 lb)) from the slat tracks.
R
R

(7) Move the slat with the hoist and lower it onto the SUPPORT STRUCTURESLAT.
Subtask 27-84-64-942-050
B. Removal of Equipment
(1) If you are to install a new slat, remove the SLATS - SLING (Ref. TASK
27-80-00-000-001).



EFF :
ALL
 27-84-64



AIJ




Page 408
Nov 01/10

TASK 27-84-64-400-002
Installation of the No. 2 Slat
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No
No
No
No
No

specific
specific
specific
specific
specific

1
1
1
1

98D27804001000
98D27804009001
98D27804011000
98D27804020001

1
1
1
1

ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


SAFETY BARRIER(S)
WARNING NOTICE(S)
WRENCH - PNEUMATIC
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
ADAPTOR-DRIVE, SLAT (AND FLAP)
SLATS - SLING
BAR-TURNING
BLOCK-SLAT GAPPING



EFF :
ALL
 27-84-64



AIJ




Page 409
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------No specific
Material No. 05-047
Material No. 09-001
Material No. 09-016
Material No. 11-026
Material No. 19-003

lockwire, corrosion resistant steel 0.8 mm (0.032


in) dia
C
Z-11.904
ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II
CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

C. Expendable Parts
------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
------------------------------------------------------------------------------R
R
R
R

23
23
23
23

cotter
cotter
cotter
cotter

pins
pins
pins
pins

27-84-62
27-84-62
27-84-62
27-84-62

01A-010
01B-010
02A-010
02B-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-42-00-861-001
24-42-00-862-001
27-50-00-000-003

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Ground Service Network from the External
Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)



EFF :
ALL
 27-84-64



AIJ




Page 410
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-004
27-84-00-710-001
27-84-45-000-004
27-84-45-400-005
27-84-69-000-001
27-84-69-400-001
57-41-37-000-006

57-41-37-400-006

27-84-64-991-002
27-84-64-991-003
27-84-64-991-001
27-84-64-991-004
27-84-64-991-005

Installation of the Lock-Torque Shaft - Flaps and


Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Extending the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shaft 6010CM(6060CM)
Installation of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Installation of the Closing Plates for the Slat
Tracks 1 thru 12
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Installation of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522 KB(622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-84-64-941-053
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to operate the slat controls.



EFF :
ALL
 27-84-64



AIJ




Page 411
Feb 01/11

Subtask 27-84-64-860-051
B. Aircraft Maintenance Configuration
R

(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in


position below the applicable zone 510(610).
(2) Make sure that the applicable access panel has been removed
(Ref. TASK 57-41-37-000-006):
- for the left wing, 522NB
- for the right wing, 622NB.

R
R

(3) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).
(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is
installed on the flap/slat control lever on panel 114VU.
(5) Make sure that the applicable slat track closing-plate has been
removed (Ref. TASK 27-84-69-000-001).
(6) Make sure that the applicable torque shaft has been removed
(Ref. TASK 27-84-45-000-004).
(7) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS) is installed
outboard of the removed torque shaft (Ref. TASK 27-50-00-400-003).
Subtask 27-84-64-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-64



AIJ




Page 412
Nov 01/10

4. Procedure
_________
Subtask 27-84-64-420-051
A. Preparation for Installation
(Ref. Fig. 401/TASK 27-84-64-991-002, 402/TASK 27-84-64-991-003, 403/TASK
27-84-64-991-001, 404/TASK 27-84-64-991-004, 405/TASK 27-84-64-991-005)

(1) Clean the component interface and or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Clean the recess area of bolts using solvent and air dry.
(3) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047) to
the recess area of the bolts (80).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Install the SLATS - SLING (Ref. TASK 27-80-00-400-001).
(6) Loosen the bolts (80) and push the seal (81) into the slat to the
limit of its adjustment.
NOTE : This will give the clearance between the seal (81) and the
____
pylon structure during the slat rigging procedure.
(7) Tighten the bolts (80) with your hand.
(8) Remove and discard the lockwire from the stop-bolt (67) (if
applicable).
(9) Remove the stop-bolt (67) and the washers (68) and (69), from the
hold-down bracket (70). Keep the washers (68) and (69).
(10) Install the stop-bolt (67) in the hold-down bracket (70). Tighten the
stop-bolt (67) with your hand.
(11) Remove the nuts (29) and (44) and the locking plates (28) and (43).
Subtask 27-84-64-420-052
B. Installation of the No. 2 Slat
(Ref. Fig. 401/TASK 27-84-64-991-002, 402/TASK 27-84-64-991-003, 403/TASK
27-84-64-991-001)
(1) Lift the slat into position.



EFF :
ALL
 27-84-64



AIJ




Page 413
Feb 01/11

R
R

Slat Rigging Detail


Figure 404/TASK 27-84-64-991-004



EFF :
ALL
 27-84-64



AIJ




Page 414
Feb 01/07

R
R

Slat Rigging Detail


Figure 405/TASK 27-84-64-991-005



EFF :
ALL
 27-84-64



AIJ




Page 415
Feb 01/11

(2) At the Nos. 5 and 6 slat tracks:


(a) Clean the recess area of bolts using solvent and air dry.
(b) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047)
to the recess area of the bolts (27), (30), (41) and (42).
(c) Install the bush (26) in the slat.
(d) Attach the slat to the slat tracks, and the slat track links
with:
- the bolts (27), (30), (41) and (42)
- the washers (21), (25), (48) and (50)
- the nuts (22), (24), (49) and (51).
NOTE : If necessary, turn the eccentric bushes (31) and (46) to
____
install the bolts (27), (30), (41) and (42).
(e) TORQUE the nuts (22), (24), (49), (51), (55) and (56) to between
1.95 and 2.2 m.daN (14.38 and 16.22 lbf.ft).
(f) Safety the nuts (22), (24), (49), (51), (55) and (56) with the
new cotter pins (23) at the No. 5 slat track and cotter pins (23)
at the No. 6 slat track.
(g) Do not torque or safety the nuts (32) and (47).
(3) Remove the SLATS - SLING (Ref. TASK 27-80-00-000-001).
(4) You must adjust the upper trailing-edge of the slat to its maximum
height, related to the fixed leading-edge. To adjust the height, turn
the eccentric bushes (31) and (46) on the No. 5 and 6 slat tracks.
Subtask 27-84-64-820-055
C. Adjustment of the Slat
(Ref. Fig. 401/TASK 27-84-64-991-002, 402/TASK 27-84-64-991-003, 403/TASK
27-84-64-991-001, 404/TASK 27-84-64-991-004)
(1) Install the BLOCK-SLAT GAPPING at the No. 9 slat track.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).



EFF :
ALL
 27-84-64


R 
AIJ




Page 416
Feb 01/11

(3) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) to retract the slats until
they are approximately 50.8 mm (2.0000 in.) +/- 6.35 mm (0.2500 in.)
from the BLOCK-SLAT GAPPING.
(4) Use the BAR-TURNING to slowly retract the slats until the BLOCK-SLAT
GAPPING touches the bottom roller at the No. 9 slat track.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(6) Adjust the eccentric bushes (31) and (46) at the No. 5 and 6 slat
tracks to get dimension L. Refer to the table that follows.
NOTE : Measure dimension L above the applicable slat track.
____
------------------------------------------------------------------------------| TRACK |
DIMENSION L
|
MAXIMUM ADJUSTMENT BECAUSE OF
|
|
NOS. |
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------| 5 and 6 | 4.00 mm (0.1575 in.) | +0.25 mm (0.01 in.) -0.25 mm (0.01 in.) |
------------------------------------------------------------------------------(7) Install the locking plates (28) and (43) and the nuts (29) and (44).
(8) TORQUE the nuts (32) and (47) to between 1.95 and 2.2 m.daN (14.38
and 16.22 lbf.ft).
(9) Safety the nuts (32) and (47) with the new cotter pins (23) at the
No. 5 slat track and cotter pins (23) at the No. 6 slat track.
(10) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(11) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-64


R 
AIJ




Page 417
Feb 01/11

(13) Apply special materials:


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(a) Apply SEALANTS (Material No. 09-001) to:
- the nuts (22), (24), (32), (47), (49), (51), (55) and (56)
- the bolt heads (18), (27), (30), (41), (42), (45), (53) and
(54)
- the locking plates (28) and (43).
(14) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.
Subtask 27-84-64-820-056
D. Adjustment of the Stop-Bolt
(Ref. Fig. 404/TASK 27-84-64-991-004)
(1) Examine the hold-down pad-head for wear. The maximium wear limit is 1
mm (0.0393 in.) or an overall head thickness of 2.5 mm (0.0984 in.).
Replace the hold-down pad if the head is worn more than these
specified limits.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(3) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats.
(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(5) Turn the stop-bolt (67) until it touches the hold-down pad.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).



EFF :
ALL
 27-84-64


R 
AIJ




Page 418
Feb 01/11

(7) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(9) Measure the dimension Q under the head of the stop-bolt (67).
(10) Remove the stop-bolt (67).
(11) The value of dimension R is between 0.37 mm (0.0145 in.) and 0.42 mm
(0.0165 in.). Subtract the dimension R from the dimension Q. The
difference is the total thickness of the washers (68) and the washer
(69) that you must install.
(12) Install the washers (68) and (69) to give the correct dimension R.
(13) Install and tighten the stop-bolt (67).
(14) Safety the stop-bolt (67) to the hold-down bracket (70) with
lockwire, corrosion resistant steel 0.8 mm (0.032 in) dia.
(15) Install the slat closing plate (Ref. TASK 27-84-69-400-001).
Subtask 27-84-64-420-053
E. Continue with the Installation Procedure
(Ref. Fig. 401/TASK 27-84-64-991-002, 403/TASK 27-84-64-991-001)
(1) Slat-to-Slat interface connection
(a) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed
outboard of the removed torque shaft FIN 6010CM(6060CM)
(Ref. TASK 27-50-00-000-003).
(b) Manually extend the slats to the fully extended position.
(c) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400003).
(d) Install the weather seal (2). Make sure that the end of the
weather seal is aligned with the slat lower trailing-edge.
(e) Install the stops (3) and attach them with the screws (1).



EFF :
ALL
 27-84-64


R 
AIJ




Page 419
Feb 01/11

(f) Attach the bonding strap (5) with the bolt (6) and the nut (4)
(Ref. TASK 20-28-00-912-004).
(2) Slat-to-track bonding strap connection
(a) Attach the bonding strap (17) with the bolt (19) and the nut (16)
(Ref. TASK 20-28-00-912-004).
Subtask 27-84-64-820-058
F. Seal Adjustment after Installation of a New Slat
(Ref. Fig. 405/TASK 27-84-64-991-005)

(1) Remove the screws (80), the support assembly (82) and the seal (81).
(2) Apply a layer of SEALANTS (Material No. 09-016) to the screws (80).
(3) While the sealant is still wet, install the seal (81) and the support
assembly (82) with the screws (80). Tighten the screws (80) by hand.
(4) Adjust the seal (81) to touch the pylon structure over its full
length.
(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(6) Slowly, manually retract the slats to the fully retracted position.
(7) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(8) Look at the seal (81) to make sure that it touches the pylon
structure over its full length.
(9) If the seal (81) does not touch the pylon structure over its full
length, do the adjustment procedure again.
(10) When the adjustment is correct, remove the LOCK-TORQUE SHAFT (FLAPS
AND SLATS) (Ref. TASK 27-50-00-000-003), installed outboard of the
removed torque shaft FIN 6010CM(6060CM).
(11) Manually extend the slats to the fully extended position.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-64



AIJ




Page 420
Feb 01/11

(13) Fully tighten the screws (80).


Subtask 27-84-64-860-052
G. Aircraft Maintenance Configuration
(1) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats to the zero position.
(2) Energize the ground service network (Ref. TASK 24-42-00-861-001).
(3) On the MCDU display, make sure that the PPU DATA page is shown (to
monitor the slats PPU position).
(4) If necessary, use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT
(AND FLAP) to move the slat drive shaft until the PPU data shows the
same values as recorded in Para. 3.B.:
- the FPPU angle value must agree +/- 0.1 deg.
- the APPU angle value must agree +/- 0.1 deg.
- the FPPU and APPU angles must agree +/- 1.3 deg.
- the LH APPU and the RH APPU angles must agree +/- 0.45 deg.
(5) De-energize the ground service network (Ref. TASK 24-42-00-862-001).
(6) Remove the WRENCH - PNEUMATIC and ADAPTOR-DRIVE, SLAT (AND FLAP) from
the slat drive shaft.
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS) (Ref. TASK 27-50-00000-003), installed outboard of the removed torque shaft FIN
6010CM(6060CM).
Subtask 27-84-64-865-054
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-64


R 
AIJ




Page 421
Feb 01/11

Subtask 27-84-64-410-053
J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the safety collar on the circuit breakers 9CV and 11CV.
(3) Install the applicable torque shaft (Ref. TASK 27-84-45-400-005):
- for the left wing, install FIN 6010CM
- for the right wing, install FIN 6060CM.
(4) Install the applicable access panel (Ref. TASK 57-41-37-400-006):
- for the left wing install, 522NB
- for the right wing install, 622NB.
Subtask 27-84-64-710-051
K. Test
(1) The operational test of the slat system (Ref. TASK 27-84-00-710-001),
was done during the installation of the torque shaft FIN
6010CM(6060CM).
5. Close-up
________
Subtask 27-84-64-942-053
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-64



AIJ




Page 422
Feb 01/11

SLAT 3 - REMOVAL/INSTALLATION
_____________________________
R

TASK 27-84-65-000-001
Removal of the No. 3 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
No specific
No specific
98D27803500001
98D27804001000

blanking covers
circuit breaker(s) safety clip(s)
pneumatic wrench
safety barriers
support structure
warning notice
access platform 3.5 m (11 ft. 6 in.)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
1 ADAPTOR-DRIVE, SLAT (AND FLAP)



EFF :
ALL
 27-84-65



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-005
27-84-45-000-004
27-84-69-000-001
30-11-41-000-001
31-32-00-860-006
57-41-37-000-006
R
R
R
27-84-65-991-001
27-84-65-991-002
27-84-65-991-003

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Retracting the Slats on the Ground
Removal of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Removal of the Telescopic Duct
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-65-991-001)
Subtask 27-84-65-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Fully retract the slats (Ref. TASK 27-80-00-866-005).
(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.



EFF :
ALL
 27-84-65



AIJ




Page 402
Nov 01/10

R
R

Slat-to-Slat Interface - Location


Figure 401/TASK 27-84-65-991-001



EFF :
ALL
 27-84-65



AIJ




Page 403
Feb 01/07

(4) Put a warning notice in the cockpit to tell persons not to operate
the slat controls.
Subtask 27-84-65-860-054
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM


DATA SLT>

- the MCDU shows the slat SYSTEM DATA


submenu.

4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(4) Remove the safety collar from the circuit breakers 9CV and 11CV.



EFF :
ALL
 27-84-65


R 
AIJ




Page 404
Feb 01/07

Subtask 27-84-65-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-84-65-010-051
D. Get Access
(1) Put the adjustable access platform in position below the zone
510(610).
(2) Remove the applicable access panel (Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.
(3) Remove the applicable telescopic duct (Ref. TASK 30-11-41-000-001).
(4) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004):
- for the left wing remove FIN 6010CM
- for the right wing remove FIN 6060CM.
(5) Install the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) and a
pneumatic wrench on the applicable bevel gearbox:
- for the left wing, use FIN 6010CM
- for the right wing, use FIN 6060CM.
This will let you operate the slats manually.
R

(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
(7) Manually extend the slats to the fully extended position.

(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(9) Remove the slat closing plate (Ref. TASK 27-84-69-000-001).



EFF :
ALL
 27-84-65



AIJ




Page 405
Feb 01/08

Subtask 27-84-65-480-051
E. Installation of Support Equipment
(1) Install the SLATS - SLING (Ref. TASK 27-80-00-400-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-65-991-001, 402/TASK 27-84-65-991-002, 403/TASK
27-84-65-991-003)
Subtask 27-84-65-020-051
A. Removal of the No. 3 Slat
(1) Lift the SLATS - SLING sufficiently, until it has the weight of the
slat.
(2) At the interface of the Nos. 2 and 3 slats and the Nos. 3 and 4
slats:
(a) Remove the nut (6), the bolt (9) and the washer (8) then move the
bonding strap (7) away from the bonding tag.
(b) Remove the screws (1) and the stops (3).
(c) Remove the weather seal (2).
(3) At the interface of the Nos. 3 and 4 slats only:
(a) Loosen the clamps (5) and then remove the flexible tube (4) and
the clamps (5).
(b) Install blanking covers on the open ends of the anti-icing ducts.
(4) At the Nos. 7 and 8 slat tracks:
R
R

(a) Remove and discard the cotter pins (18) from the nuts (29), (46),
(54) and (55).
(b) Loosen the nuts (29), (46), (54) and (55) but do not remove them.

R
R

(c) Remove and discard the cotter pins (18) from the nuts (22), (26),
(48) and (50).



EFF :
ALL
 27-84-65



AIJ




Page 406
May 01/09

Slat Attachment at the No. 7 Slat Track


Figure 402/TASK 27-84-65-991-002



EFF :
ALL
 27-84-65



AIJ




Page 407
Nov 01/10

Slat Attachment at the No. 8 Slat Track


Figure 403/TASK 27-84-65-991-003



EFF :
ALL
 27-84-65



AIJ




Page 408
May 01/10

(d) Remove:
- the nuts (22), (26), (48) and (50)
- the washers (23), (27), (47) and (49)
- the bolts (19), (24), (40) and (41)
- the bush (17).

R
R
R
R
R
R

NOTE : The bush (17) is a part of the slat track and the slat
____
track linkage assembly.
(5) Lift the slat from the slat tracks.
(6) Move the slat with the hoist and lower it onto the support structure.
Subtask 27-84-65-860-053
B. Aircraft Maintenance Configuration
(1) If you are to install a new slat, remove the SLATS - SLING (Ref. TASK
27-80-00-000-001).



EFF :
ALL
 27-84-65



AIJ




Page 409
May 01/09

TASK 27-84-65-400-002
Installation of the No. 3 Slat
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No
No
No
No
No

specific
specific
specific
specific
specific

1
1
1
1

98D27804001000
98D27804009001
98D27804011000
98D27804020001

1
1
1
1

ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


SAFETY BARRIER(S)
WARNING NOTICE(S)
WRENCH - PNEUMATIC
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
ADAPTOR-DRIVE, SLAT (AND FLAP)
SLATS - SLING
BAR-TURNING
BLOCK-SLAT GAPPING



EFF :
ALL
 27-84-65



AIJ




Page 410
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-047
Material No. 09-001
Material No. 11-026
Material No. 19-003
Material No. 19-010

C
Z-11.904
ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R

18
18
18
18

cotter
cotter
cotter
cotter

pins
pins
pins
pins

27-84-62
27-84-62
27-84-62
27-84-62

03 -010
03A-010
04 -010
04A-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling



EFF :
ALL
 27-84-65



AIJ




Page 411
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-84-00-710-001
27-84-45-000-004
27-84-45-400-005
27-84-69-400-001
30-11-41-000-001
30-11-41-400-001
57-41-37-000-006
R
R
R
57-41-37-400-006
R
R
R
27-84-65-991-001
27-84-65-991-002
27-84-65-991-003
27-84-65-991-004-A

Extending the Slats on the Ground


Operational Test of the Slat System
Removal of the Torque Shaft 6010CM(6060CM)
Installation of the Torque Shaft 6010CM(6060CM)
Installation of the Closing Plates for the Slat
Tracks 1 thru 12
Removal of the Telescopic Duct
Installation of the Telescopic Duct
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Installation of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522 KB(622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403
Fig. 404

3. __________
Job Set-up
Subtask 27-84-65-941-052
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) is in the cockpit to tell
persons not to operate the slat controls.
Subtask 27-84-65-860-051
B. Aircraft Maintenance Configuration

(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in


position below the applicable zone 510(610).
(2) Make sure that the applicable access panel has been removed:
(Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.

R
R



EFF :
ALL
 27-84-65



AIJ




Page 412
Nov 01/10

(3) Make sure that the applicable telescopic duct has been removed
(Ref. TASK 30-11-41-000-001).
(4) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).
(5) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(6) Make sure that the safety collar is removed from circuit breakers 9CV
and 11CV.
(7) Make sure that the applicable torque shaft has been removed
(Ref. TASK 27-84-45-000-004).
(8) Make sure that the LOCK-TORQUE SHAFT (FLAPS AND SLATS)
(98D27504030001) is on the applicable torque shaft (Ref. TASK 27-5000-400-003).
Subtask 27-84-65-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-65-991-001, 402/TASK 27-84-65-991-002, 403/TASK
27-84-65-991-003, 404/TASK 27-84-65-991-004-A)

Subtask 27-84-65-420-051
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Clean the recess area of bolts using solvent and air dry.



EFF :
ALL
 27-84-65



AIJ




Page 413
May 01/10

R
R

Slat Rigging - Detail


Figure 404/TASK 27-84-65-991-004-A



EFF :
ALL
 27-84-65



AIJ




Page 414
May 01/10

(3) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047) to
the recess area of the stop-bolt (65).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Remove and discard the lockwire from the stop-bolt (65) (if
applicable).
(6) Remove the stop-bolt (65) and the washers (66) and (67) from the
hold-down bracket (68). Keep the washers (66) and (67).
(7) Install the stop-bolt (65) in the hold-down bracket (68). Tighten the
stop-bolt (65) with your hand.
(8) Remove the nuts (20) and (43) and the locking plates (21) and (42).
(9) Install the SLATS - SLING (98D27804009001) (Ref. TASK 27-80-00-400001).
Subtask 27-84-65-420-052
R

B. Installation of the No. 3 Slat


(1) Lift the slat into position.
(2) At the No. 7 and 8 slat tracks:
(a) Clean the recess area of bolts using solvent and air dry.
(b) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047)
to the recess area of the bolts (19), (24), (40) and (41).
(c) Install the bush (17) in the slat.
(d) Attach the slat to the slat tracks, and the slat track links
with:
- the bolts (19), (24), (40) and (41)
- the washers (23), (27), (47) and (49)
- the nuts (22), (26), (48) and (50).
NOTE : If necessary, turn the eccentric bushes (28) and (45) to
____
install the bolts (20), (24), (40) and (41).
(e) TORQUE the nuts (22), (26), (48), (50), (54) and (55) to between
1.92 and 2.2 m.daN (14.15 and 16.22 lbf.ft).

R
R
R

(f) Safety the nuts (22), (26), (48), (50), (54) and (55) with the
new cotter pins (18) at the No. 7 slat track and cotter pins (18)
at the No. 8 slat track.
(g) Do not torque or safety the nuts (29) and (46).



EFF :
ALL
 27-84-65



AIJ




Page 415
May 01/10

(3) Remove the SLATS - SLING (Ref. TASK 27-80-00-000-001).


(4) You must adjust the upper trailing-edge of the slat to its maximum
height related to the fixed leading-edge. To adjust the height, turn
the eccentric bushes (28) and (45) on the No. 7 and 8 slat tracks.
Subtask 27-84-65-820-055
R

C. Adjustment of the Slat


(1) Install the BLOCK-SLAT GAPPING (98D27804020001) at the No. 9 slat
track.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
(3) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) to retract
the slats until they are 50.8 mm (2.0000 in.) +/- 6.35 mm (0.2500
in.) from the BLOCK-SLAT GAPPING.
(4) Use the BAR-TURNING (98D27804011000) to slowly, retract the slats
until the BLOCK-SLAT GAPPING touches the bottom roller at the No. 9
slat track.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(6) Adjust the eccentric bushes (28) and (45) at the No. 7 and 8 slat
tracks to get dimension L. Refer to the table that follows.
NOTE : Measure the dimension L above the applicable slat track.
____
------------------------------------------------------------------------------| TRACK
|
DIMENSION L
|
MAXIMUM ADJUSTMENT BECAUSE OF
|
|
NOS.
|
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------| 7 AND 8 | 4.00 mm (0.1574 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.) |
------------------------------------------------------------------------------(7) Install the locking plates (21) and (42) and the nuts (20) and (43).
(8) TORQUE the nuts (29) and (46) to between 1.95 and 2.2 m.daN (14.38
and 16.22 lbf.ft) (detail E and H).

R
R

(9) Safety the nuts (29) and (46) with the new cotter pins (18) at the
No. 7 slat track and cotter pins (18) at the N0. 8 slat track.



EFF :
ALL
 27-84-65



AIJ




Page 416
May 01/10

(10) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
R

(11) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(13) Apply
- the
- the
- the

SEALANTS (Material No. 09-001) to:


nuts (22), (26), (29), (46), (48), (50), (54) and (55)
bolt heads (19), (24), (30), (40), (41), (44), (52) and (53)
locking plates (21) and (42).

(14) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.
Subtask 27-84-65-820-056
D. Adjustment of the Stop-Bolt
(1) Examine the hold-down pad-head for wear. The maximium wear limit is
1.0 mm (0.0393 in.) or an overall head thickness of 2.5 mm (0.0984
in.). Replace the hold-down pad if the head is worn more than these
specified limits.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
R

(3) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats.
(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(5) Turn the stop-bolt (65) until it touches the hold-down pad.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).

(7) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.



EFF :
ALL
 27-84-65



AIJ




Page 417
Nov 01/10

(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(9) Measure the dimension Q under the head of the stop-bolt (65).
(10) Remove the stop-bolt (65).
(11) The value of dimension R is between 0.2 mm (0.0078 in.) and 0.25 mm
(0.0098 in.). Subtract the dimension R from the dimension Q. The
difference is the total thickness of the washers (66) and the washer
(67) that you must install.
(12) Install the washers (66) and (67) to give the correct dimension R.
(13) Install and tighten the stop-bolt (65).
(14) Safety the stop-bolt (65) to the hold-down bracket (68) with
MISCELLANEOUS (Material No. 19-010).
R
R

(15) Install the slat closing plate (Ref. TASK 27-84-69-400-001).


Subtask 27-84-65-820-058

E. Slat-to-Slat Interface Adjustment


(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).

(2) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(3) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(4) At the interface of the Nos. 3 and 4 slats only:
(a) Remove the blanking-covers from the anti-icing ducts.
(b) Install the flexible tube (4) with the clamps (5).



EFF :
ALL
 27-84-65



AIJ




Page 418
Nov 01/10

(5) At the interface of the Nos. 2 and 3 slats and the Nos. 3 and 4
slats:
(a) Install the weather seal (2). Make sure that the end of the
weather seal is aligned with the slat lower-trailing-edge.
(b) Install the stops (3) and attach them with the screws (1).
(c) Attach the bonding strap (7) with the bolt (9), the washer (8)
and the nut (6) (Ref. TASK 20-28-00-912-004).
Subtask 27-84-65-860-052
R

F. Aircraft Maintenance Configuration


(1) Install the applicable telescopic duct (Ref. TASK 30-11-41-400-001).

(2) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats.
(3) Energize the ground service network (Ref. TASK 24-42-00-862-001).
(4) On the MCDU display, make sure that the PPU DATA page is shown (to
monitor the slats PPU position).

R
R
R

(5) If necessary, use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT
(AND FLAP) to move the slat drive shaft until the PPU data shows the
same values as recorded in Para. 3.B.:
- the FPPU angle value must agree +/- 0.1 deg.
- the APPU angle value must agree +/- 0.1 deg.
- the FPPU and APPU angles must agree +/- 1.3 deg.
- the LH APPU and the RH APPU angles must agree +/- 0.45 deg.
(6) Install the applicable torque shaft (Ref. TASK 27-84-45-400-005):
- for the left wing, install FIN 6010CM
- for the right wing, install FIN 6060CM.
(7) De-energize the ground service network (Ref. TASK 24-42-00-862-001).

R
R

(8) Remove the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP)
from the slat drive shaft.
(9) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).



EFF :
ALL
 27-84-65



AIJ




Page 419
Nov 01/10

Subtask 27-84-65-865-054
R

G. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV
Subtask 27-84-65-480-050

H. Installation of Support Equipment


(1) Install the safety collar on the circuit breakers 9CV and 11CV.
Subtask 27-84-65-410-054

J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel (Ref. TASK 57-41-37-400-006):
- for the left wing install 522NB
- for the right wing install 622NB.
Subtask 27-84-65-710-051

K. Test
(1) The operational test of the slat system (Ref. TASK 27-84-00-710-001),
was done during the installation of the torque shaft FIN 6010CM
(6060CM).
5. Close-up
________
Subtask 27-84-65-942-053
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).



EFF :
ALL
 27-84-65



AIJ




Page 420
Nov 01/10

(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-65


R 
AIJ




Page 421
Nov 01/09

SLAT 4 - REMOVAL/INSTALLATION
_____________________________
TASK 27-84-66-000-001
Removal of the No. 4 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

blanking-covers
circuit breaker(s) safety clip(s)
pneumatic wrench
safety barriers
support structure

R
R

No specific
No specific
98D27803500001
98D27804001000
98D27804009001

1
1
1
1

adjustable access platform 3.5 m (11 ft. 6 in.)


WARNING NOTICE(S)
TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
ADAPTOR-DRIVE, SLAT (AND FLAP)
SLATS - SLING



EFF :
ALL
 27-84-66



AIJ




Page 401
Nov 01/10

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-005
27-84-45-000-004
27-84-69-000-001
31-32-00-860-006
57-41-37-000-006
R
R
R
27-84-66-991-002
27-84-66-991-003
27-84-66-991-001

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Retracting the Slats on the Ground
Removal of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
Subtask 27-84-66-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Fully retract the slats (Ref. TASK 27-80-00-866-005).
(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
R
R

(4) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
the slat controls.



EFF :
ALL
 27-84-66



AIJ




Page 402
Nov 01/10

Subtask 27-84-66-860-054
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM


DATA SLT>

- the MCDU shows the slat SYSTEM DATA


submenu.

4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(4) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-84-66-865-050
C. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06



EFF :
ALL
 27-84-66


R 
AIJ




Page 403
Feb 01/07

Subtask 27-84-66-010-051
D. Get Access
(1) Put the adjustable access platform in position below the zone
510(610):
(2) Remove the applicable access panel (Ref. TASK 57-41-37-000-006):
- for the left wing remove 522NB
- for the right wing remove 622NB.
(3) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004):
- for the left wing remove FIN 6010CM
- for the right wing remove FIN 6060CM
- for the left wing, use FIN 6010CM
- for the right wing, use FIN 6060CM.
This will let you to operate the slats manually.
R

(4) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
(5) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) and a
pneumatic wrench to fully extend the slats.

(6) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(7) Remove the slat closing plate (Ref. TASK 27-84-69-000-001).
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-66-991-002, 402/TASK 27-84-66-991-003)
Subtask 27-84-66-020-051
A. Removal of the No. 4 Slat
(Ref. Fig. 403/TASK 27-84-66-991-001)
(1) At the interface of the Nos. 3 and 4 slats and the Nos. 4 and 5
slats:
(a) Remove the nut (6) the bolt (9) and the washer (8) then move the
bonding strap (7) away from the bonding tag.
(b) Remove the screws (1) and the stops (3).



EFF :
ALL
 27-84-66



AIJ




Page 404
Feb 01/08

Slat Attachment at the No. 9 Slat Track


Figure 401/TASK 27-84-66-991-002



EFF :
ALL
 27-84-66



AIJ




Page 405
May 01/10

Slat Attachment at the N0. 10 Slat Track


Figure 402/TASK 27-84-66-991-003



EFF :
ALL
 27-84-66



AIJ




Page 406
May 01/10

R
R

Slat No. 4 - Location and General Configuration


Figure 403/TASK 27-84-66-991-001



EFF :
ALL
 27-84-66



AIJ




Page 407
Feb 01/07

(c) Remove the weather seal (2).


(d) Loosen the clamps (5) and then remove the flexible tube (4) and
the clamps (5).
(e) Install blanking-covers on the open ends of the anti-icing ducts.
R

(2) Install the SLATS - SLING (98D27804009001) (Ref. TASK 27-80-00-400001).

(3) Lift the SLATS - SLING sufficiently, until it has the weight of the
slat
(4) At the Nos. 9 and 10 slat tracks:
(a) Remove and discard the cotter pins (25) from the nuts (31), (45),
(53) and (54).
(b) Loosen the nuts (31), (45), (53) and (54), but do not remove
them.
(c) Remove and discard the cotter pins (25) from the nuts (24), (27),
(47) and (49).
(d) Remove:
- the nuts (24), (27), (47) and (49)
- the washers (23), (26), (46) and (48)
- the bolts (20), (30), (39) and (40)
- the bush (29).
NOTE : The bush (29) is a part of the slat track and the slat
____
track linkage assembly.
(5) Lift the slat (24.8 kg (54.67 lb)) from the slat tracks.
(6) Move the slat with the hoist and lower it onto the support structure.
Subtask 27-84-66-860-053
B. Aircraft Maintenance Configuration

(1) If you are to install a new slat, remove the SLATS - SLING (Ref. TASK
27-80-00-000-001).



EFF :
ALL
 27-84-66



AIJ




Page 408
Feb 01/08

TASK 27-84-66-400-002
Installation of the No. 4 Slat
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No
No
No
No
No

specific
specific
specific
specific
specific

1
1
1
1

98D27804001000
98D27804009001
98D27804011000
98D27804020001

1
1
1
1

ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


SAFETY BARRIER(S)
WARNING NOTICE(S)
WRENCH - PNEUMATIC
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
ADAPTOR-DRIVE, SLAT (AND FLAP)
SLATS - SLING
BAR-TURNING
BLOCK-SLAT GAPPING



EFF :
ALL
 27-84-66



AIJ




Page 409
Nov 01/10

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-047
Material No. 09-001
Material No. 11-026
Material No. 19-003
Material No. 19-010

C
Z-11.904
ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R

25
25
25
25

cotter
cotter
cotter
cotter

pins
pins
pins
pins

27-84-62
27-84-62
27-84-62
27-84-62

06 -010
06A-010
07A-010
07B-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-42-00-861-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Ground Service Network from the External
Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling



EFF :
ALL
 27-84-66



AIJ




Page 410
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-004
27-84-00-710-001
27-84-45-000-004
27-84-45-400-005
27-84-69-000-001
27-84-69-400-001
57-41-37-000-006
R
R
R
57-41-37-400-006
R
R
R
27-84-66-991-002
27-84-66-991-003
27-84-66-991-001
27-84-66-991-004-A

Extending the Slats on the Ground


Operational Test of the Slat System
Removal of the Torque Shaft 6010CM(6060CM)
Installation of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Installation of the Closing Plates for the Slat
Tracks 1 thru 12
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Installation of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522 KB(622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403
Fig. 404

3. __________
Job Set-up
Subtask 27-84-66-941-053
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

(2) Make sure that the WARNING NOTICE(S) are in the cockpit to tell
persons not to operate the slats.
Subtask 27-84-66-860-051
B. Aircraft Maintenance Configuration

R
R

(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in


position below the a pplicable zone 510(610).

R
R

(2) Make sure that the applicable access panel has been removed
(Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.



EFF :
ALL
 27-84-66



AIJ




Page 411
Nov 01/10

(3) Make sure that the slats are fully extended (Ref. TASK 27-80-00-866004).
(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(5) Make sure that the safety collar is removed from the circuit breakers
9CV and 11CV.
(6) Make sure that the applicable torque shaft has been removed
(Ref. TASK 27-84-45-000-004).
(7) Make sure that the slat closing plate has been removed (Ref. TASK 2784-69-000-001).
Subtask 27-84-66-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-66-991-002, 402/TASK 27-84-66-991-003, 403/TASK
27-84-66-991-001, 404/TASK 27-84-66-991-004-A)

Subtask 27-84-66-560-050
A. Preparation of a Replacement Component
(1) Install the SLATS - SLING (98D27804009001) (Ref. TASK 27-80-00-400001).
Subtask 27-84-66-420-051
B. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-84-66



AIJ




Page 412
May 01/10

R
R

Slat Rigging - Detail.


Figure 404/TASK 27-84-66-991-004-A



EFF :
ALL
 27-84-66



AIJ




Page 413
May 01/10

(2) Clean the recess area of bolts using solvent and air dry.
(3) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047) to
the recess area of the stop-bolt (63).
(4) Do an inspection of the component interface and/or the adjacent area.
(5) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(6) If applicable, remove and discard the lockwire from the stop-bolt.
(7) Remove the stop-bolt (63) and the washers (64) and (65), from the
hold-down bracket (66). Keep the washers (64) and (65).
(8) Install the stop-bolt (63) in the hold down bracket (66). Tighten the
stop-bolt (63) with your hand.
(9) Remove the nuts (19) and (42) and the locking plates (18) and (41).
Subtask 27-84-66-420-052
R

C. Installation of the No. 4 Slat


(1) Lift the slat into position.
(2) At the Nos. 9 and 10 slat tracks:
(a) Clean the recess area of bolts using solvent and air dry.
(b) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047)
to the recess area of the bolts (20), (30), (39) and (40).
(c) Install the bush (29) in the slat.
(d) Attach the slat to the slat tracks and the slat tracks links
with:
- the bolts (20), (30), (39) and (40)
- the washers (23), (26), (46) and (48)
- the nuts (24), (27), (47) and (49).
NOTE : If necessary, turn the eccentric bushes (22) and (44) as
____
necessary to install the bolts (20), (30), (39) and (40).
(e) TORQUE the nuts (24), (27), (47), (49), (53) and (54) to between
1.95 and 2.2 m.daN (14.38 and 16.22 lbf.ft).



EFF :
ALL
 27-84-66



AIJ




Page 414
May 01/10

R
R
R

(f) Safety the nuts (24), (27), (47), (49), (53) and (54) with the
new cotter pins (25) at the No. 9 slat track and cotter pins (25)
at the No. 10 slat track.
(g) Do not torque or safety the nuts (31) and (45).
(3) Remove the SLATS - SLING (Ref. TASK 27-80-00-000-001).
(4) Adjust the upper trailing-edge of the slat to its maximum height,
related to the fixed leading-edge.
(5) To adjust the height, turn the eccentric bushes (22) and (44) at the
No. 9 and 10 slat tracks.
Subtask 27-84-66-820-055

D. Adjustment of the Slat


(1) Install the BLOCK-SLAT GAPPING (98D27804020001) at the No. 9 slat
track.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
(3) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) to retract
the slats until they are approximately 50.80 mm (2.0000 in.) +/- 6.35
mm (0.2500 in.) from the BLOCK-SLAT GAPPING.
(4) Use the BAR-TURNING (98D27804011000) to slowly, retract the slats
until the BLOCK-SLAT GAPPING touches the bottom roller at the No. 9
slat track.
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(6) Adjust the eccentric bushes (22) and (44) at the No. 9 and 10 slat
tracks to get dimension L. Refer to the table that follows.
NOTE : Measure the dimension L above the applicable slat track.
____



EFF :
ALL
 27-84-66



AIJ




Page 415
May 01/10

------------------------------------------------------------------------------| TRACK |
DIMENSION L
| MAXIMUM ADJUSTMENT BECAUSE OF
|
|
NOS. |
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------|
9
| 4.00 mm (0.1575 in.) | +0.25 mm (0.01 in.) -0.25 mm (0.01 in.) |
|
10
| 3.50 mm (0.1377 in.) | +0.25 mm (0.01 in.) -0.25 mm (0.01 in.) |
------------------------------------------------------------------------------(7) Install the locking plates (18) and (41) and the nuts (19) and (42).
(8) TORQUE the nuts (31) and (45) to between 1.95 and 2.2 m.daN (14.38
and 16.22 lbf.ft).
(9) Safety the nuts (31) and (45) with the new cotter pins (25) at the
No. 9 slat track and cotter pins (25) at the No. 10 slat track.
(10) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (FIN 6060CM) (Ref. TASK 27-50-00000-003).
R

(11) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS), outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(13) Apply special materials:
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(a) Apply SEALANTS (Material No. 09-001) to:
- the nuts (24), (27), (31), (47), (49), (53), (54) and (45)
- the bolt heads (20), (21), (30), (39), (40), (43), (51) and
(52)
- the locking plates (18) and (41).
(14) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.



EFF :
ALL
 27-84-66



AIJ




Page 416
Nov 01/10

Subtask 27-84-66-820-056
E. Adjustment of the Stop-Bolt
(1) Examine the hold-down pad-head for wear. The maximium wear limit is
1.0 mm (0.0393 in.) or an overall head thickness of 2.5 mm (0.0984
in.). Replace the hold-down pad if the head is worn more than these
specified limits.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
R

(3) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats.
(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(5) Turn the stop-bolt (63) until it touches the hold-down pad.
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft 6010CM (6060CM) (Ref. TASK 27-50-00-000003).

(7) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(9) Measure the dimension R under the head of the stop-bolt (63).
(10) Remove the stop-bolt (63).
(11) The value of dimension S is between 0.2 mm (0.0078 in.) and 0.25 mm
(0.0098 in.). Subtract the dimension S from the dimension R. The
difference is the total thickness of the washers (64) and the washer
(65) that you must install.
(12) Install the washers (64) and (65) to give the correct dimension S.
(13) Install and tighten the stop-bolt (63).



EFF :
ALL
 27-84-66



AIJ




Page 417
Nov 01/10

(14) Safety the stop-bolt (63) to the hold-down bracket (66) with
MISCELLANEOUS (Material No. 19-010).
R
R

(15) Install the slat closing plate (Ref. TASK 27-84-69-400-001).


Subtask 27-84-66-820-058

F. Slat-to-Slat Interface Adjustment


(1) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).

(2) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully extend the slats.
(3) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-400003).
(4) At the interface of the Nos. 3 and 4 slats and the Nos. 4 and 5
slats:
(a) Remove the blanking-covers from the anti-icing ducts.
(b) Install the flexible tubes (4) with the clamps (5).
(c) Install the weather seal (2). Make sure that the end of the
weather seal (2) is aligned with the slat lower trailing-edge.
(d) Install the stops (3) and attach them with the screws (1).
(e) Attach the bonding strap (7) to the bonding tag with the bolt
(9), the washer (8) and the nut (6) (Ref. TASK 20-28-00-912-004).
Subtask 27-84-66-860-052

G. Aircraft Maintenance Configuration

(1) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats to the zero position.
(2) Energize the ground service network (Ref. TASK 24-42-00-861-001).
(3) On the MCDU display, make sure that the PPU DATA page is shown (to
monitor the slats PPU position).



EFF :
ALL
 27-84-66



AIJ




Page 418
Nov 01/10

R
R
R

(4) If necessary, use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT
(AND FLAP) to move the slat drive shaft until the PPU data (on the
MCDU) shows the same values as recorded in Para. 3.B.:
- the FPPU angle value must agree +/- 0.1 deg.
- the APPU angle value must agree +/- 0.1 deg.
- the FPPU and APPU angle values must agree +/- 1.3 deg.
- the LH APPU and the RH APPU angles must agree +/- 0.45 deg.
(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM (6060CM) (Ref. TASK 27-50-00-000003).
Subtask 27-84-66-865-054

H. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV.
Subtask 27-84-66-410-053

J. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the safety collar on the circuit breakers 9CV and 11CV.
(3) Install the applicable torque shaft (Ref. TASK 27-84-45-400-005):
- for the left wing, install FIN 6010CM
- for the right wing, install FIN 6060CM.
(4) Install the applicable access panel (Ref. TASK 57-41-37-400-006):
- for the left wing, install 522NB
- for the right wing, install 622NB.
Subtask 27-84-66-710-051

K. Test
(1) The operational test of the slat system (Ref. TASK 27-84-00-710-001),
was done during the installation of the torque shaft FIN 6010CM
(6060CM).



EFF :
ALL
 27-84-66



AIJ




Page 419
Nov 01/10

5. Close-up
________
Subtask 27-84-66-942-053
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-66


R 
AIJ




Page 420
May 01/10

SLAT 5 - REMOVAL/INSTALLATION
_____________________________
TASK 27-84-67-000-001
Removal of the No. 5 Slat
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

R
R

No specific
No specific
No specific
No specific
No specific
No specific
No specific
98D27504030001
98D27804001000
98D27804009001

blanking-covers
circuit breaker(s) safety clip(s)
pneumatic wrench
safety barriers
support structure
warning notice
adjustable access platform 3.5 m (11 ft. 6 in.)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 ADAPTOR-DRIVE, SLAT (AND FLAP)
2 SLATS - SLING



EFF :
ALL
 27-84-67



AIJ




Page 401
Feb 01/08

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-005
27-84-45-000-004
27-84-69-000-001
31-32-00-860-006
57-41-37-000-006
R
R
R
27-84-67-991-001
27-84-67-991-002
27-84-67-991-003

Energize the Ground Service Network from the External


Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Retracting the Slats on the Ground
Removal of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12
Procedure to Get Access to the SYSTEM REPORT/TEST
F/CTL Page
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403

3. __________
Job Set-up
(Ref. Fig. 401/TASK 27-84-67-991-001)
Subtask 27-84-67-941-050
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Fully retract the slats (Ref. TASK 27-80-00-866-005).
(3) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control lever on panel 114VU.
(4) Put a warning notice in position to tell persons not to operate the
slat controls.



EFF :
ALL
 27-84-67



AIJ




Page 402
Nov 01/10

Slat-to-Slat Interface - Location


Figure 401/TASK 27-84-67-991-001



EFF :
ALL
 27-84-67



AIJ




Page 403
Aug 01/09

Subtask 27-84-67-860-054
B. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2) On the MCDU:
(a) Get access to the SYSTEM REPORT/TEST F/CTL page (Ref. TASK 31-3200-860-006).
------------------------------------------------------------------------------ACTION
RESULT
------------------------------------------------------------------------------1. On MCDU:
- push the line key for <SFCC1

On the MCDU:
- the MCDU shows the SFCC1 menu page 1.

2. Push the NEXT PAGE button

- the MCDU shows the SFCC1 menu page 2.

3. Push the line key (2L) SYSTEM


DATA SLT>

- the MCDU shows the slat SYSTEM DATA


submenu.

4. Push the line key (1L) <PPU

- the MCDU shows the PPU DATA page(s).

5. Write down the APPU and the FPPU


angles (deg) shown on the display
or push (in) the line key PRINT >
to get a print out of the screen.
(3) De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(4) Remove the safety collar from the circuit breakers 9CV and 11CV.
Subtask 27-84-67-010-050
C. Get Access
(1) Put the adjustable access platform below the zone 510(610):
(2) Remove the applicable access panel (Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.



EFF :
ALL
 27-84-67


R 
AIJ




Page 404
Feb 01/07

(3) Remove the applicable torque shaft (Ref. TASK 27-84-45-000-004):


- for the left wing remove FIN 6010CM
- for the right wing remove FIN 6060CM.
(4) Install the ADAPTOR-DRIVE, SLAT (AND FLAP) and a pneumatic wrench on
the bevel gearbox:
- for the left wing, use FIN 6010CM
- for the right wing, use FIN 6060CM.
This will let you operate the slats manually.
R

(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(6) Manually extend the slats to the fully extended position.

(7) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(8) Remove the slat closing plate (Ref. TASK 27-84-69-000-001).
Subtask 27-84-67-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
Subtask 27-84-67-480-051
E. Installation of the Support Equipment

(1) Install the SLATS - SLING (Ref. TASK 27-80-00-400-001).



EFF :
ALL
 27-84-67



AIJ




Page 405
Feb 01/08

4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-67-991-001, 402/TASK 27-84-67-991-002, 403/TASK
27-84-67-991-003)
Subtask 27-84-67-020-051
A. Removal of the No. 5 Slat
R

(1) Lift the SLATS - SLING, until it has the weight of the slat.
(2) Disconnect the slat-to-track bonding strap at No. 11 slat track:
(a) Remove and discard the lockwire from the bolt (24).
(b) Remove the nut (19) the washer (20) and the bonding strap (21)
from the bolt (24) but do not remove the bolt (24).
(c) Install the washer (20) and the nut (19) on the bolt (24).
(3) Disconnect the slat-to-slat interface:
(a) Remove the nut (6), the bolt (9) and the washer (8) then move the
bonding strap (7) away from the bonding tag.
(b) Remove the screws (1) and the stops (3).
(c) Remove the weather seal (2).
(d) Loosen the clamps (5) and then remove the flexible tube (4) and
the clamps (5).
(e) Install blanking-covers on the open ends of the anti-icing ducts.
(4) At the Nos. 11 and 12 slat tracks:
(a) Remove and discard the cotter pins (27) from the nuts (35), (47),
(46) and (45).
(b) Loosen the nuts (35), (47), (46) and (45), but do not remove
them.
(c) Remove and discard the cotter pins (27) from the nuts (26), (31),
(43) and (44).



EFF :
ALL
 27-84-67



AIJ




Page 406
Feb 01/08

Slat Attachment at the No. 11 Slat Track


Figure 402/TASK 27-84-67-991-002



EFF :
ALL
 27-84-67



AIJ




Page 407
May 01/10

Slat Attachment at the No. 12 Slat Track


Figure 403/TASK 27-84-67-991-003



EFF :
ALL
 27-84-67



AIJ




Page 408
May 01/10

(d) Remove the items that follow:


- the nuts (26), (31), (43) and (44)
- the washers (25), (30), (51) and (52)
- the bolts (18), (32), (48) and (56)
- the bush (29).
NOTE : The bush (29) is a part of the slat track and the slat
____
track linkage assembly.
(5) Lift the slat (30 kg (66.1386 lb)) from the slat tracks.
(6) Move the slat with the hoist and lower it onto the support structure.
Subtask 27-84-67-860-053
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
CAUTION : MAKE SURE THAT THE SLAT TRACK LINKS DO NOT TOUCH THE WING, IF
_______
YOU RETRACT THE SLAT SYSTEM AFTER A SLAT HAS BEEN REMOVED.
R

(1) If you are to install a new slat, remove the SLATS - SLING (Ref. TASK
27-80-00-000-001).



EFF :
ALL
 27-84-67



AIJ




Page 409
Feb 01/08

TASK 27-84-67-400-002
Installation of the No. 5 Slat
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------R
R
R
R

No
No
No
No
No

specific
specific
specific
specific
specific

98D27504030001
98D27804009001

1
1
1
1

ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE


SAFETY BARRIER(S)
WARNING NOTICE(S)
WRENCH - PNEUMATIC
Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
1 LOCK-TORQUE SHAFT (FLAPS AND SLATS)
1 SLATS - SLING

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-047
Material No. 09-001
Material No. 09-016
Material No. 11-026

C
Z-11.904
ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT)
(Ref. 20-31-00)
USA MIL-S-8802
TYPE I
CLASS A
FUEL TANK SEALANT (Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II
CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)



EFF :
ALL
 27-84-67



AIJ




Page 410
Nov 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 19-003
Material No. 19-010

USA AMS 3819


LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Expendable Parts

R
R
R

------------------------------------------------------------------------------FIG.ITEM |DESIGNATION
|IPC-CSN
-------------------------------------------------------------------------------

R
R
R
R

27
27
27
27

cotter
cotter
cotter
cotter

pins
pins
pins
pins

27-84-62
27-84-62
27-84-62
27-84-62

07A-010
07B-010
08 -010
08A-010

D. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------20-28-00-912-004
24-42-00-861-001
24-42-00-862-001
27-50-00-000-003
27-50-00-400-003
27-80-00-000-001
27-80-00-400-001
27-80-00-866-004
27-80-00-866-005
27-84-00-710-001
27-84-45-000-004
27-84-45-400-005
27-84-69-000-001

Electrical Bonding of Components With Conductive


Bolts and Screws and Bonding Straps in the Fuselage
and in the Wings (this does not include the tanks)Energize the Ground Service Network from the External
Power
De-energize the Ground Service Network Supplied from
the External Power
Removal of the Lock-Torque Shaft - Flaps and Slats
(98D27504030001)
Installation of the Lock-Torque Shaft - Flaps and
Slats (98D27504030001)
Removal of the Hoisting Sling
Installation of the Hoisting Sling
Extending the Slats on the Ground
Retracting the Slats on the Ground
Operational Test of the Slat System
Removal of the Torque Shaft 6010CM(6060CM)
Installation of the Torque Shaft 6010CM(6060CM)
Removal of the Closing Plates for the Slat Tracks 1
thru 12



EFF :
ALL
 27-84-67



AIJ




Page 411
May 01/10

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-84-69-400-001
57-41-37-000-006
R
R
R
57-41-37-400-006
R
R
R
27-84-67-991-001
27-84-67-991-002
27-84-67-991-003
27-84-67-991-004
27-84-67-991-005

Installation of the Closing Plates for the Slat


Tracks 1 thru 12
Removal of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522KB (622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Installation of the Access Panels 522FB(622FB),
522HB(622HB), 522JB(622JB), 522 KB(622KB),
522LB(622LB), 522NB(622NB), 522QB(622QB),
522SB(622SB), 522UB(622UB)
Fig. 401
Fig. 402
Fig. 403
Fig. 404
Fig. 405

3. __________
Job Set-up
Subtask 27-84-67-941-051
A. Safety Precautions
R

(1) Make sure that the SAFETY BARRIER(S) are in position.

R
R

(2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not operate the slat controls.
Subtask 27-84-67-860-051
B. Aircraft Maintenance Configuration

(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in


position below the applicable zone 510(610):
(2) Make sure that the applicable access panel has been removed
(Ref. TASK 57-41-37-000-006):
- for the left wing, remove 522NB
- for the right wing, remove 622NB.

R
R

(3) Make sure that the slats are extended fully (Ref. TASK 27-80-00-866004).



EFF :
ALL
 27-84-67



AIJ




Page 412
Nov 01/10

(4) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is on
the flap/slat control lever on panel 114VU.
(5) Make sure that the safety collar is removed from the circuit breakers
9CV and 11CV.
(6) Make sure that the applicable torque shaft has been removed
(Ref. TASK 27-84-45-000-004).
R
R

(7) Make sure that the ADAPTOR-DRIVE, SLAT (AND FLAP) and a WRENCH PNEUMATIC are on the applicable bevel gearbox.
(8) Make sure that the slat closing plate has been removed (Ref. TASK 2784-69-000-001).
Subtask 27-84-67-865-053
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/WTB/SLT/SYS2
11CV
P19
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
122VU FLIGHT CONTROLS/WTB/SLT/SYS1
9CV
S06
4. Procedure
_________
(Ref. Fig. 401/TASK 27-84-67-991-001, 402/TASK 27-84-67-991-002, 403/TASK
27-84-67-991-003, 404/TASK 27-84-67-991-004, 405/TASK 27-84-67-991-005)
Subtask 27-84-67-560-050
A. Preparation for a Replacement Component
(1) Install the SLATS - SLING (98D27804009001) (Ref. TASK 27-80-00-400001).
Subtask 27-84-67-420-051
B. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).



EFF :
ALL
 27-84-67



AIJ




Page 413
Nov 01/10

Slat Rigging - Detail


Figure 404/TASK 27-84-67-991-004



EFF :
ALL
 27-84-67



AIJ




Page 414
Aug 01/09

Slat Rigging - Detail


Figure 405/TASK 27-84-67-991-005



EFF :
ALL
 27-84-67



AIJ




Page 415
May 01/10

(2) Do an inspection of the component interface and/or the adjacent area.


(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Loosen the screws (83) and push the seal (85) into the slat to the
limit of its adjustment.
NOTE : This will give the clearance between the seal (85) and the
____
pylon structure during the slat rigging procedure.
(5) Tighten the screws (83) with your hand.
(6) If applicable, remove and discard the lockwire from the stop-bolt
(70).
(7) Remove the stop-bolt (70) and the washers (71) and (72), from the
hold-down bracket (73). Keep the washers (71) and (72).
(8) Install the stop-bolt (70) in the hold-down bracket (73). Tighten the
stop-bolt (70) with your hand.
(9) Remove the nuts (34) and (58) and the locking plates (33) and (57).
Subtask 27-84-67-420-052
R

C. Installation of the No. 5 Slat


(1) Lift the slat into position.
(2) At the Nos. 11 and 12 slat tracks:
(a) Clean the recess area of bolts using solvent and air dry.
(b) Apply putty MASTINOX D40 SPECIAL MATERIALS (Material No. 05-047)
to the recess area of the bolts (18), (32), (48) and (56).
(c) Remove the blanking-covers from the ends of the anti-icing ducts.
(d) Connect the flexible tube (4) with the clamp (5) to one of the
slat-to-slat interface connection side.
(e) Install the bush (29) in the slat.



EFF :
ALL
 27-84-67



AIJ




Page 416
May 01/10

(f) Attach the slat to the slat tracks and the slat track links with:
- the bolts (18), (32), (48) and (56)
- the washers (25), (30), (51) and (52)
- the nuts (26), (31), (43) and (44).
NOTE : If necessary, turn the eccentric bushes (23) and (50) to
____
install the bolts (18), (32), (48) and (56).
(g) Connect the flexible tube (4) with the clamp (5) to the other
side of the slat-to-slat interface connection.
(h) TORQUE the nuts (26), (31), (43) and (45) to between 1.20 and
1.35 m.daN (106.19 and 119.46 lbf.in).
(i) TORQUE the nuts (44), and (46) to between 1.50 and 1.70 m.daN
(11.06 and 12.53 lbf.ft).
R
R
R

(j) Safety the nuts (26), (31), (43), (44), (45) and (46) with the
new cotter pins (27) for the No. 11 slat track and cotter pins
(27) for the No. 12 slat track.
(k) Do not torque or safety the nuts (35) and (47).
(3) Remove the SLATS - SLING (Ref. TASK 27-80-00-000-001).
(4) Adjust the upper trailing-edge of the slat to its maximum height,
related to the fixed leading-edge.
(5) To adjust the height, turn the eccentric bushes (23) and (50) on the
No. 11 and 12 tracks.
Subtask 27-84-67-820-057

D. Adjustment of the Slat


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Install the BLOCK-SLAT GAPPING (98D27804020001) at the No. 9 slat
track.



EFF :
ALL
 27-84-67



AIJ




Page 417
May 01/10

(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(3) Use the ADAPTOR-DRIVE, SLAT (AND FLAP) (98D27804001000) to retract
the slats until they are approximately 50.8 mm (2.0000 in.) +/- 6.35
mm (0.2500 in.) from the BLOCK-SLAT GAPPING.
(4) Use the BAR-TURNING (98D27804011000) to slowly, retract the slats
until the BLOCK-SLAT GAPPING touches the bottom roller at the No. 9
slat track.
(Ref. Fig. 404/TASK 27-84-67-991-004)
(5) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(6) Adjust the eccentric bushes (23) and (50) at the No. 11 and 12 slat
tracks to get the dimension L. Refer to the table that follows:
NOTE : Measure the dimension L above the applicable slat track.
____
------------------------------------------------------------------------------|
TRACK
|
DIMENSION L
|
MAXIMUM ADJUSTMENT BECAUSE OF
|
|
NOS.
|
|
LOCKING PLATE INSTALLATION
|
------------------------------------------------------------------------------| 11 and 12 | 2.75 mm (0.1082 in.) | + 0.25 mm (0.01 in.) - 0.25 mm (0.01 in.)|
------------------------------------------------------------------------------(7) Install the locking plates (33) and (57) and the nuts (34) and (58).
(8) TORQUE the nuts (35) and (47) to between 1.95 and 2.2 m.daN (14.38
and 16.22 lbf.ft).
R
R

(9) Safety the nuts (35) and (47) with the new cotter pins (27) for the
No. 11 slat track and cotter pins (27) for the No. 12 slat track.
(10) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(11) Manually extend the slats to the fully extended position.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-67



AIJ




Page 418
May 01/10

(13) Apply
- the
- the
- the

SEALANTS (Material No. 09-001) to:


nuts (26), (31), (35), (43), (44), (45), (46) and (47)
bolt heads (18), (22), (32), (48), (49), (54), (55) and (56)
locking plates (33) and (57).

(14) Remove the BLOCK-SLAT GAPPING from the No. 9 slat track.
Subtask 27-84-67-820-058
E. Adjustment of the Stop-Bolt
(1) Examine the hold-down pad-head for wear. The maximium wear limit is 1
mm (0.0393 in.) or an overall head thickness of 2.5 mm (0.0984 in.).
Replace the hold-down pad if the head is worn more than these
specified limits.
(2) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(3) Manually retract the slats to the datum zero position.
(4) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(5) Turn the stop-bolt (70) until it touches the hold-down pad (73).
(6) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(7) Manually extend the slats to the fully extended position.
(8) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(9) Measure the dimension Q under the head of the stop-bolt (70).
(10) Remove the stop-bolt (70).
(11) The value of dimension R is between 0.20 mm (0.0078 in.) and 0.25 mm
(0.0098 in.). Subtract the dimension R from the dimension Q. The
difference is the total thickness of the washers (71) and the washer
(72) that you must install.
(12) Install the washers (71) and (72) to give the correct dimension R.



EFF :
ALL
 27-84-67


R 
AIJ




Page 419
May 01/10

(13) Install and tighten the stop-bolt (70).


(14) Safety the stop-bolt (70) to the hold-down bracket (73) with
MISCELLANEOUS (Material No. 19-010).
R
R

(15) Install the slat closing plate (Ref. TASK 27-84-69-400-001).


Subtask 27-84-67-420-053

F. Continue with the Installation Procedure


(1) At the slat-to-slat interface connection:
(a) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed
outboard of the removed torque shaft FIN 6010CM(6060CM)
(Ref. TASK 27-50-00-000-003).
(b) Manually extend the slats to the fully extended position.
(c) Remove the blanking covers and connect the flexible tube (4) with
the clamps (5).
(d) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400003).
(e) Install the weather seal (2). Make sure that the end of the
weather seal is aligned with the slat lower trailing-edge.
(f) Install the stops (3) and attach them with the screws (1).
(g) Attach the bonding strap (7) with the bolt (9), the washer (8)
and the nut (6) (Ref. TASK 20-28-00-912-004).
(2) At the slat-to-track interface connection:
(a) Remove the nut (19) and the washer (20) from the bolt (24).
(b) Install the bonding strap (21), the washer (20) and the nut (19)
on the bolt (24) (Ref. TASK 20-28-00-912-004).
(c) Safety the bolts (24) with MISCELLANEOUS (Material No. 19-010).



EFF :
ALL
 27-84-67



AIJ




Page 420
Nov 01/10

Subtask 27-84-67-820-060
R

G. Seal Adjustment after Adjustment of a New Slat


WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______
MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Remove the screws (83), the support assembly (84) and the seal (85).
(2) Apply a layer of SEALANTS (Material No. 09-016) to the screws (83).
(3) While the sealant is still wet, install the seal (85) and the support
assembly (84) with the screws (83). Tighten the screws by hand.
(4) Adjust the seal (85) to touch the wing tip structure over its full
length.
(5) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
(6) Slowly, manually retract the slats to the fully retracted position.
(7) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).
(8) Look at the seal (85) to make sure that it touches the wing tip
structure over its full length.
(9) If the seal (85) does not touch the wing tip structure over its full
length, do the adjustment again.
(10) When the adjustment is correct, remove the LOCK-TORQUE SHAFT (FLAPS
AND SLATS) installed outboard of the removed torque shaft FIN
6010CM(6060CM) (Ref. TASK 27-50-00-000-003).
(11) Manually extend the slats to the fully extended position.
(12) Install the LOCK-TORQUE SHAFT (FLAPS AND SLATS) outboard of the
removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-400-003).



EFF :
ALL
 27-84-67



AIJ




Page 421
Nov 01/10

(13) Fully tighten the screws (83).


Subtask 27-84-67-860-052
R

H. Aircraft Maintenance Configuration

(1) Use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP) to
fully retract the slats to the zero position.
(2) Energize the ground service network (Ref. TASK 24-42-00-861-001).
(3) On the MCDU display, make sure that the PPU DATA page is shown (to
monitor the slats PPU position).

(4) If necessary, use the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT
(AND FLAP) to move the slat drive shaft until the PPU data (on the
MCDU) shows the same values as recorded in Para. 3.B.:
- the FPPU angle value must agree +/- 0.1 deg.
- the APPU angle value must agree +/- 0.1 deg.
- the FPPU and APPU angles must agree +/- 1.3 deg.
- the LH APPU and the RH APPU angles must agree +/- 0.45 deg.
(5) De-energize the ground service network (Ref. TASK 24-42-00-862-001).

(6) Remove the WRENCH - PNEUMATIC and the ADAPTOR-DRIVE, SLAT (AND FLAP)
from the slat drive shaft.
(7) Remove the LOCK-TORQUE SHAFT (FLAPS AND SLATS), installed outboard of
the removed torque shaft FIN 6010CM(6060CM) (Ref. TASK 27-50-00-000003).
Subtask 27-84-67-865-054

J. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV, 9CV, 11CV.
Subtask 27-84-67-410-053

K. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the safety collars on the circuit breakers 9CV and 11CV.



EFF :
ALL
 27-84-67



AIJ




Page 422
Nov 01/10

(3) Install the applicable torque shaft (Ref. TASK 27-84-45-400-005)


- for the left wing, install FIN 6010CM
- for the right wing, install FIN 6060CM.
Subtask 27-84-67-866-063
R

L. Move the Slats


WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Extend the slats fully (Ref. TASK 27-80-00-866-004).
Subtask 27-84-67-410-054

M. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install the applicable access panel (Ref. TASK 57-41-37-400-006):
- for the left wing install 522NB
- for the right wing install 622NB.
Subtask 27-84-67-866-064

N. Move the Slats


WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Retract the slats fully (Ref. TASK 27-80-00-866-005).
Subtask 27-84-67-710-051

P. Test
(1) The operational test of the slat system (Ref. TASK 27-84-00-710-001),
was done during the installation of the torque shaft FIN
6010CM(6060CM).



EFF :
ALL
 27-84-67



AIJ




Page 423
Nov 01/10

5. Close-up
________
Subtask 27-84-67-942-052
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
flap/slat control lever on panel 114VU.
(4) Remove the warning notice(s).
(5) Remove the access platform(s).
(6) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-67


R 
AIJ




Page 424
May 01/08

PINION ASSEMBLY - SLAT TRACKS - REMOVAL/INSTALLATION


____________________________________________________
R

TASK 27-84-68-000-001
Removal of the Slat-Track Pinion Assembly
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
No specific
98D27803500001
98D27804019000

circuit breaker(s) safety clip(s)


safety barriers
safety line
warning notice
access platform, adjustable, 4 m (13 ft. 1 in.)
1 TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
1 BEAM SUPPORT-SLATS 3, 4 AND 5



EFF :
ALL
 27-84-68



AIJ




Page 401
Feb 01/07

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-84-48-000-001
27-84-49-000-002
R

27-84-68-991-001

Retracting the Slats on the Ground


Removal of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Removal of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/6041CM (6091CM)
Fig. 401

3. __________
Job Set up
R

(Ref. Fig. 401/TASK 27-84-68-991-001)


Subtask 27-84-68-941-055
A. Safety Precautions
(1) Put the safety barriers in position.
(2) Put a warning notice in position to tell persons not to operate the
slat controls.
Subtask 27-84-68-860-050
B. Aircraft Maintenance Configuration
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______
CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
AND/OR DAMAGE.
(1) Make sure that the slats are retracted (Ref. TASK 27-80-00-866-005).
(2) Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001)
on the flap/slat control-lever.



EFF :
ALL
 27-84-68



AIJ




Page 402
Feb 01/07

Subtask 27-84-68-481-050
C. Installation of Safety Devices
(1) Install the applicable safety devices:
- for slats 1 and 2, attach a safety line to the ditching lugs on the
wing
- for slats 3, 4 and 5, install the BEAM SUPPORT-SLATS 3, 4 AND 5
(98D27804019000).
Subtask 27-84-68-865-050
D. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
Subtask 27-84-68-941-054
E. Get Access
(1) Put an access platform, adjustable, below the applicable slat.
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-84-68-991-001)


Subtask 27-84-68-020-050
A. Removal of the Slat-Track Pinion Assembly
NOTE : Pinion assemblies are not installed in slat tracks 1 and 4.
____
(1) Remove the applicable actuator (Ref. TASK 27-84-48-000-001) or
(Ref. TASK 27-84-49-000-002):
-

for
for
for
for
for
for
for

track
track
track
track
track
track
track

2
3
5
6
7
8
9

pinion,
pinion,
pinion,
pinion,
pinion,
pinion,
pinion,

remove
remove
remove
remove
remove
remove
remove

6013CM
6015CM
6027CM
6029CM
6033CM
6035CM
6037CM

(6063CM)
(6065CM)
(6077CM)
(6079CM)
(6083CM)
(6085CM)
(6087CM)



EFF :
ALL
 27-84-68



AIJ




Page 403
Feb 01/07

R
R

Slat-Track Pinion Assembly - Location and Detail


Figure 401/TASK 27-84-68-991-001- 14 (SHEET 1)



EFF :
ALL
 27-84-68



AIJ




Page 404
Feb 01/07

R
R

Slat-Track Pinion Assembly - Location and Detail


Figure 401/TASK 27-84-68-991-001- 24 (SHEET 2)



EFF :
ALL
 27-84-68



AIJ




Page 405
Feb 01/07

R
R

Slat-Track Pinion Assembly - Location and Detail


Figure 401/TASK 27-84-68-991-001- 34 (SHEET 3)



EFF :
ALL
 27-84-68



AIJ




Page 406
Feb 01/07

R
R

Slat-Track Pinion Assembly - Location and Detail


Figure 401/TASK 27-84-68-991-001- 44 (SHEET 4)



EFF :
ALL
 27-84-68



AIJ




Page 407
Feb 01/07

- for track 10 pinion, remove 6039CM (6089CM)


- for track 11 pinion, remove 6041CM (6091CM)
- for track 12 pinion, remove 6045CM (6095CM).
(2) For slat tracks 2, 3, 5, 6, 7, 8, 9 and 12:
(a) For slat track 5, 6 and 8 only:
1
_

Remove and discard the lockwire from the bolts (3).

2
_

Remove the bolts (3) and the bracket (4).

(b) Remove the bolts (1) and the actuator housing (2).
(c) Remove the bolts (7) and the end cover (8).
(d) Remove together, the bearing (5) and the pinion assembly (6).
(e) Remove the bearing (5) from the pinion assembly (6).
NOTE : The pinion assembly (6) and bearing (5) can be installed
____
with the bearing on the inboard or outboard side. Record
the initial position of the pinion assembly (6) before
removal.
(3) For slat tracks 10 and 11:
(a) Remove the bolts (19), the washers (20) and the actuator housing
(21).
(b) Remove the bolts (24), the washers (25) and the end cover (26).
(c) Remove together, the bearing (22) and the pinion assembly (23).
(d) Remove the bearing (22) from the pinion assembly (23).
NOTE : The pinion assembly (23) and bearing (22) can be installed
____
with the bearing on the inboard or outboard side. Record
the initial position of the pinion assembly (23) before
removal.



EFF :
ALL
 27-84-68


R 
AIJ




Page 408
Feb 01/07

TASK 27-84-68-400-001
Installation of the Slat-Track Pinion Assembly
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______
NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific
No specific
98D27803500001
98D27804006000
98D27804007000
98D27804019000

1
1
1
1

safety barriers
safety line
warning notice
access platform 4.0 m (13 ft. 1 in.)
TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3)
TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12)
BEAM SUPPORT-SLATS 3, 4 AND 5

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-004
Material No. 04-022
R

USA MIL-PRF-23827
TYPE I
SYNTH.ESTER BASED GREASE HIGH PRESSURE
(Ref. 20-31-00)
USA MIL-PRF-81322
SYNTHE.HYDROCARBON GREASE HIGH PRESSURE
(Ref. 20-31-00)

Material No. 04-024


SYNTHETIC GREASE FOR FLAP & SLAT MECHANISM
(Ref. 20-31-00)



EFF :
ALL
 27-84-68



AIJ




Page 409
Nov 01/09

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-063
Material No. 09-018
R
Material No. 09-019
R
Material No. 11-026
Material No. 15-007
Material No. 19-003
Material No. 19-010

USA MIL-A-907
NEVERSEEZ NICKEL SPECIAL GRADE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
USA AMS 3267/3
NO LONGER AVAILABLE (Ref. 20-31-00)
GB DEF-STAN
68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
AIB TN 10138
TYPE II GRADE 1
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-80-00-866-005
27-84-00-710-001
27-84-48-400-001
27-84-49-400-002
27-84-68-991-001

Retracting the Slats on the Ground


Operational Test of the Slat System
Installation of the Type A Actuators
6013CM(6063CM)/6015CM(6065CM)
Installation of the Type B Actuators
6033CM(6083CM)/6037CM(6087CM)/ 6041CM(6091CM)
Fig. 401

3. __________
Job Set-up
Subtask 27-84-68-941-056
A. Safety Precautions
(1) Make sure that the safety barriers are in position.
(2) Make sure that the warning notice is in position to tell persons not
to operate the slat controls.



EFF :
ALL
 27-84-68



AIJ




Page 410
Nov 01/08

Subtask 27-84-68-860-051
B. Aircraft Maintenance Configuration
(1) Make sure that the access platform is below the applicable slat.
(2) Make sure that the slats are retracted (Ref. TASK 27-80-00-866-005).
(3) Make sure that the applicable slat is held safely in position:
- for slats 1 and 2, held in position with a safety line
- for slats 3, 4 and 5, held in position with the BEAM SUPPORT-SLATS
3, 4 AND 5 (98D27804019000).
(4) Make sure that the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER
(98D27803500001) is installed on the flap/slat control-lever.
Subtask 27-84-68-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1
5CV
B06
121VU FLIGHT CONTROLS/SLT/CTL/SYS2
7CV
R21
4. Procedure
_________
R

(Ref. Fig. 401/TASK 27-84-68-991-001)


Subtask 27-84-68-420-054
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a
MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS
(Material No. 11-026).
(2) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(3) Do an inspection of the component interface and/or the adjacent area.



EFF :
ALL
 27-84-68



AIJ




Page 411
Feb 01/07

(4) For the slat tracks 2, 3, 5, 6, 7, 8, 9 and 12:


(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
interface of the actuator housing (2) and the rib.
(b) Apply SPECIAL MATERIALS (Material No. 05-063) to the internal
splines of the pinion assembly (6) and the interface of the
pinion assembly (6) and the bearing (5).
(c) Use a MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026) to clean:
- the pinion assembly (6)
- the component interface and/or the adjacent area.
(d) Install the bearing (5) on the pinion assembly (6) as follows:
1
_

Align the pinion pin on the pinion assembly (6) with the fork
on the bearing (5).

2
_

Push the pinion assembly (6) and the bearing (5) together.
Make sure that the pinion pin engages with the fork on the
bearing (5).

(e) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS


(Material No. 09-019) to the shanks of the bolts (1) and (7).
(5) For the slat tracks 10 and 11:
(a) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the
interface of the actuator housing (21) and the rib.
(b) Apply SPECIAL MATERIALS (Material No. 05-063) to the internal
splines of the pinion assembly (23) and the interface of the
pinion assembly (23) and the bearing (22).
(c) Use a MISCELLANEOUS (Material No. 19-003) and CLEANING AGENTS
(Material No. 11-026) to clean:
- the pinion assembly (23)
- the component interface and/or the adjacent area.
(d) Install the bearing (22) on the pinion assembly (23) as follows:
1
_

Align the pinion pin on the pinion assembly (23) with the fork
on the bearing (22).



EFF :
ALL
 27-84-68



AIJ




Page 412
Feb 01/07

2
_

Push the pinion assembly (23) and the bearing (22) together.
Make sure that the pinion pin engages with the fork on the
bearing (22).

(e) Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS


(Material No. 09-019) to the shanks of the bolts (19) and (24).
Subtask 27-84-68-420-052
B. Installation of the Slat-Track Pinion-Assembly
(1) For slat tracks 2, 3, 5, 6, 7, 8, 9 and 12:
(a) Put the pinion assembly (6), together with
position between the track ribs. Make sure
- the pinion assembly (6) engages with the
- the greasers are aligned so that persons
them.

the bearing (5), in


that:
slat track
can get access to

NOTE : It is recommended that a used pinion assembly (6) and


____
bearing (5) are installed in their initial position. A new
pinion assembly (6) can be installed with the bearing (5)
on the inboard or outboard side.
(b) Install the end cover (8) with the bolts (7). Tighten the bolts
(7) with your hand.
(c) Install the actuator housing (2) with the bolts (1). Tighten the
bolts (1) with your hand.
(d) To align the pinion assembly (6) correctly:
- for slat track 2 and 3, install the TOOL-ALIGNMENT AND LOCKING
(SLAT TRACKS 2 AND 3) on the flange of the actuator housing (2)
- for slat tracks 5, 6, 7, 8, 9 and 12, install the TOOLALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12) on the flange of
the actuator housing (2).
(e) Tighten the bolts (1) and (7) in a diagonal sequence.
(f) Remove the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 2 AND 3)
and/or the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12).



EFF :
ALL
 27-84-68


R 
AIJ




Page 413
Feb 01/07

(2) For slat tracks 10 and 11:


(a) Put the pinion assembly (23), together with the bearing (22), in
position between the track ribs. Make sure that:
- the pinion assembly (23) engages with the slat track
- the greasers are aligned so that persons can get access to
them.
NOTE : It is recommended that a used pinion assembly (23) and
____
bearing (22) are installed in their initial position. A
new pinion assembly (23) can be installed with the bearing
(22) on the inboard or outboard side.
(b) Install the end cover (26) with the bolts (24) and the washers
(25). Tighten the bolts (24) with your hand.
(c) Install the actuator housing (21) with the bolts (19) and the
washers (20). Tighten the bolts (19) with your hand.
(d) To align the pinion assembly (23) correctly, install the TOOLALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12) on the flange of the
actuator housing (21).
(e) Tighten the bolts (19) and (24) in a diagonal sequence.
(f) Remove the TOOL-ALIGNMENT AND LOCKING (SLAT TRACKS 5 TO 12).
Subtask 27-84-68-420-053
C. Continue with the Installation Procedure
(1) For slat tracks 2, 3, 5, 6, 7, 8, 9 and 12:
(a) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) on
and around the bolts (1) and (7), and the related bushes and
nutplates.
R
R
R

(b) Lubricate the greasers on the pinion assembly (6) with COMMON
GREASE (Material No. 04-024) or COMMON GREASE (Material No. 04004).
(c) For slat track 5, 6 and 8 only:
1
_

Apply a layer of SEALANTS (Material No. 09-018) or SEALANTS


(Material No. 09-019) to the shanks of the bolts (3).

2
_

Install the bracket (4) and the bolts (3).



EFF :
ALL
 27-84-68



AIJ




Page 414
Nov 01/08

3
_

Tighten the bolts (3).

4
_

Safety the bolts (3) with MISCELLANEOUS (Material No. 19-010).

5
_

Apply a layer of STORAGE PRESERVATION (Material No. 15-007) to


the bolts (3).

(2) For slat tracks 10 and 11:


(a) Apply a layer of STORAGE PRESERVATION (Material No. 15-007) on
and around the bolts (19) and (24), the washers (20) and (25) and
the related nutplates.
R
R
R

(b) Lubricate the greasers on the pinion assembly (23) with COMMON
GREASE (Material No. 04-024) or COMMON GREASE (Material No. 04004).
(3) Remove the safety line from the applicable slats 1 and 2.
(4) Remove the BEAM SUPPORT-SLATS 3, 4 AND 5 from the applicable slat.
(5) Install the applicable actuator (Ref. TASK 27-84-48-400-001) or
(Ref. TASK 27-84-49-400-002):
- for track 2 pinion, install 6013CM (6063CM)
- for track 3 pinion, install 6015CM (6065CM)
- for track 5 pinion, install 6027CM (6077CM)
- for track 6 pinion, install 6029CM (6079CM)
- for track 7 pinion, install 6033CM (6083CM)
- for track 8 pinion, install 6035CM (6085CM)
- for track 9 pinion, install 6037CM (6087CM)
- for track 10 pinion, install 6039CM (6089CM)
- for track 11 pinion, install 6041CM (6091CM)
- for track 12 pinion, install 6045CM (6095CM).
Subtask 27-84-68-865-052
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
5CV, 7CV.
Subtask 27-84-68-710-050
E. Test
(1) Do an operational test of the slat system (Ref. TASK 27-84-00-710001).



EFF :
ALL
 27-84-68



AIJ




Page 415
Nov 01/08

5. Close-up
________
Subtask 27-84-68-942-050
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the safety barriers.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).
(5) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :
ALL
 27-84-68


R 
AIJ




Page 416
Feb 01/07

PINION ASSEMBLY - SLAT TRACKS - REPAIRS


_______________________________________
TASK 27-84-68-350-003
Repair of Damaged Flanks of the Teeth of the Slat Track Pinions and Gear Racks
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FL