Cargos de construccin de redes subterraneas

Pre

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE ALUMINIO) (NO URBANIZADO)


Descripcin

Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Supervision

($)

($)

($)

($)

($)

1C-1F-2H-13 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

185,354.13

31,490.15

341,822.16

7,602.45

10,573.39

1C-1F-2H-13 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

234,642.40

37,281.22

341,822.16

8,490.04

12,102.96

1C-1F-2H-23 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

205,467.84

31,490.15

341,822.16

7,602.45

10,573.39

1C-1F-2H-23 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

273,530.07

37,281.22

341,822.16

8,490.04

12,102.96

1C-1F-2H-33 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

245,904.63

31,490.15

341,822.16

7,602.45

10,573.39

1C-1F-2H-33 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

311,889.52

37,281.22

341,822.16

8,490.04

12,102.96

1C-3F-4H-13 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

359,195.33

86,735.91

468,370.42

19,631.06

26,102.50

1C-3F-4H-13 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

439,809.86

98,753.93

468,370.42

20,518.65

27,632.06

1C-3F-4H-13 kV500 KCM-AL-XLP


(NO URBANIZADO)

800,801.52

104,984.04

488,799.22

21,928.93

30,062.35

1C-3F-4H-23 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

419,536.45

86,735.91

468,370.42

19,631.06

26,102.50

1C-3F-4H-23 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

556,472.87

98,753.93

468,370.42

20,518.65

27,632.06

1C-3F-4H-23 kV500 KCM-AL-XLP


(NO URBANIZADO)

863,549.74

111,105.06

488,799.22

21,928.93

30,062.35

1C-3F-4H-33 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

540,846.83

86,735.91

468,370.42

19,631.06

26,102.50

1C-3F-4H-33 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

671,551.23

98,753.93

468,370.42

20,518.65

27,632.06

1C-3F-4H-33 kV500 KCM-AL-XLP


(NO URBANIZADO)

1,123,805.23

111,105.06

488,799.22

21,928.93

30,062.35

2C-3F-4H-13 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

623,899.38

169,604.54

728,436.13

37,673.97

49,396.16

2C-3F-4H-13 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

751,503.30

190,963.00

728,436.13

38,561.58

50,925.71

2C-3F-4H-13 kV500 KCM-AL-XLP


(NO URBANIZADO)

1,397,256.75

198,366.42

769,699.47

39,971.85

53,356.01

2C-3F-4H-23 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

744,581.63

169,604.54

728,436.13

37,673.97

49,396.16

2C-3F-4H-23 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

984,829.31

190,963.00

728,436.13

38,561.58

50,925.71

2C-3F-4H-23 kV500 KCM-AL-XLP


(NO URBANIZADO)

1,522,753.19

210,608.47

769,699.47

39,971.85

53,356.01

2C-3F-4H-33 kV1/0 AWG-AL-XLP


(NO URBANIZADO)

987,202.39

169,604.54

728,436.13

37,673.97

49,396.16

2C-3F-4H-33 kV3/0 AWG-AL-XLP


(NO URBANIZADO)

1,214,986.03

190,963.00

728,436.13

38,561.58

50,925.71

2C-3F-4H-33 kV500 KCM-AL-XLP


(NO URBANIZADO)

2,043,264.16

210,608.47

769,699.47

39,971.85

53,356.01

NOTA:
Estos costos no
incluyen IVA

Costo por conexin


de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 624.08

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DISTRIBUCIN


Descripcin

1C-1F-2H-13 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)


1C-1F-2H-13 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-23 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-23 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-33 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-33 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-1/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-3/0 AWG-AL-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-500 AWG-AL-XLP (PERFORACION DIRECCIONAL)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DISTRIB


Descripcin

1C-1F-2H-13 kV-1/0 AWG-AL-XLP (CON BANQUETA)


1C-1F-2H-13 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-1F-2H-23 kV-1/0 AWG-AL-XLP (CON BANQUETA)
1C-1F-2H-23 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-1F-2H-33 kV-1/0 AWG-AL-XLP (CON BANQUETA)
1C-1F-2H-33 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-13 kV-1/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-13 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-13 kV-500 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-23 kV-1/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-23 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-23 kV-500 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-33 kV-1/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-33 kV-3/0 AWG-AL-XLP (CON BANQUETA)
1C-3F-4H-33 kV-500 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-13 kV-1/0 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-13 kV-3/0 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-13 kV-500 AWG-AL-XLP (CON BANQUETA)

2C-3F-4H-23 kV-1/0 AWG-AL-XLP (CON BANQUETA)


2C-3F-4H-23 kV-3/0 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-23 kV-500 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-33 kV-1/0 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-33 kV-3/0 AWG-AL-XLP (CON BANQUETA)
2C-3F-4H-33 kV-500 AWG-AL-XLP (CON BANQUETA)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DIST


Descripcin

1C-1F-2H-13 kV-1/0 AWG-AL-XLP (ARROYO)


1C-1F-2H-13 kV-3/0 AWG-AL-XLP (ARROYO)
1C-1F-2H-23 kV-1/0 AWG-AL-XLP (ARROYO)
1C-1F-2H-23 kV-3/0 AWG-AL-XLP (ARROYO)
1C-1F-2H-33 kV-1/0 AWG-AL-XLP (ARROYO)
1C-1F-2H-33 kV-3/0 AWG-AL-XLP (ARROYO)
1C-3F-4H-13 kV-1/0 AWG-AL-XLP (ARROYO)
1C-3F-4H-13 kV-3/0 AWG-AL-XLP (ARROYO)
1C-3F-4H-13 kV-500 AWG-AL-XLP (ARROYO)
1C-3F-4H-23 kV-1/0 AWG-AL-XLP (ARROYO)

1C-3F-4H-23 kV-3/0 AWG-AL-XLP (ARROYO)


1C-3F-4H-23 kV-500 AWG-AL-XLP (ARROYO)
1C-3F-4H-33 kV-1/0 AWG-AL-XLP (ARROYO)
1C-3F-4H-33 kV-3/0 AWG-AL-XLP (ARROYO)
1C-3F-4H-33 kV-500 AWG-AL-XLP (ARROYO)
2C-3F-4H-13 kV-1/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-13 kV-3/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-13 kV-500 AWG-AL-XLP (ARROYO)
2C-3F-4H-23 kV-1/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-23 kV-3/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-23 kV-500 AWG-AL-XLP (ARROYO)
2C-3F-4H-33 kV-1/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-33 kV-3/0 AWG-AL-XLP (ARROYO)
2C-3F-4H-33 kV-500 AWG-AL-XLP (ARROYO)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

Precios a agosto del 2014 M.N.

TORES DE ALUMINIO) (NO URBANIZADO)


Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

4,973.67

581,815.95

16,952.59

5,476.08

639,814.85

23,442.28

4,973.67

601,929.66

16,952.59

5,476.08

678,702.52

23,442.28

4,973.67

642,366.45

19,261.82

5,476.08

717,061.98

23,442.28

11,641.20

971,676.42

29,858.94

12,143.61

1,067,228.51

36,348.63

12,941.88

1,459,517.95

54,681.45

11,641.20

1,032,017.54

29,858.94

12,143.61

1,183,891.52

36,348.63

12,941.88

1,528,387.18

54,681.45

11,641.20

1,153,327.92

36,786.61

12,143.61

1,298,969.89

36,348.63

12,941.88

1,788,642.67

54,681.45

21,642.49

1,630,652.68

49,218.45

22,144.90

1,782,534.63

55,708.13

22,943.18

2,481,593.68

80,968.64

21,642.49

1,751,334.93

49,218.45

22,144.90

2,015,860.63

55,708.13

22,943.18

2,619,332.17

80,968.64

21,642.49

1,993,955.69

63,073.79

22,144.90

2,246,017.36

55,708.13

22,943.18

3,139,843.14

80,968.64

OR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE ALUMINIO) (PERFORACIN DIRECCIONAL)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

185,354.13

31,490.15

724,397.66

234,642.40

37,281.22

724,397.66

205,467.84

31,490.15

724,397.66

273,530.07

37,281.22

724,397.66

245,904.63

31,490.15

724,397.66

311,889.52

37,281.22

724,397.66

359,195.33

86,735.91

1,006,677.35

439,809.86

98,753.93

1,006,677.35

800,801.52

104,984.04

1,027,106.16

419,536.45

86,735.91

1,006,677.35

556,472.87

98,753.93

1,006,677.35

863,549.74

111,105.06

1,027,106.16

540,846.83

86,735.91

1,006,677.35

671,551.23

98,753.93

1,006,677.35

1,123,805.23

111,105.06

1,027,106.16

623,899.38

169,604.54

1,556,047.18

751,503.30

190,963.00

1,556,047.18

1,397,256.75

198,366.42

1,597,310.52

744,581.63

169,604.54

1,556,047.18

984,829.31

190,963.00

1,556,047.18

1,522,431.37

210,032.18

1,597,310.52

987,202.39

169,604.54

1,556,047.18

1,214,986.03

190,963.00

1,556,047.18

2,043,264.16

210,608.47

1,597,310.52

NOTA:

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE ALUMINIO) (CON BANQUETA)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

185,354.13

31,490.15

493,909.57

234,642.40

37,281.22

493,909.57

205,467.84

31,490.15

493,909.57

273,530.07

37,281.22

493,909.57

245,904.63

31,490.15

493,909.57

311,889.52

37,281.22

493,909.57

359,195.33

86,735.91

694,253.09

439,809.86

98,753.93

694,253.09

800,801.52

104,984.04

714,681.90

419,536.45

86,735.91

694,253.09

556,472.87

98,753.93

694,253.09

863,549.74

111,105.06

714,681.90

540,846.83

86,735.91

694,253.09

671,551.23

98,753.93

694,253.09

1,123,805.23

111,105.06

714,681.90

623,899.38

169,604.54

950,256.12

751,503.30

190,963.00

950,256.12

1,397,256.75

198,366.42

991,519.45

744,581.63

169,604.54

950,256.12

984,829.31

190,963.00

950,256.12

1,522,753.19

210,608.47

991,519.45

987,202.39

169,604.54

950,256.12

1,214,986.03

190,963.00

950,256.12

2,043,264.16

210,608.47

991,519.45

NOTA:

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE ALUMINIO) (ARROYO)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

179,096.00

31,490.15

503,481.59

228,384.27

37,281.22

503,481.59

199,209.70

31,490.15

503,481.59

267,271.93

37,281.22

503,481.59

239,646.49

31,490.15

503,481.59

305,631.38

37,281.22

503,481.59

352,937.19

86,735.91

737,675.73

433,551.73

98,753.93

737,675.73

791,551.90

104,984.04

755,989.79

413,278.31

86,735.91

737,675.73

NOTA:

550,214.72

98,753.93

737,675.73

854,300.12

111,105.06

755,989.79

534,588.69

86,735.91

737,675.73

665,293.09

98,753.93

737,675.73

1,114,555.61

111,105.06

755,989.79

614,649.76

169,604.54

991,579.51

742,253.69

190,963.00

991,579.51

1,385,172.57

198,366.42

1,039,310.90

735,332.01

169,604.54

991,579.51

975,579.68

190,963.00

991,579.51

1,510,669.01

210,608.47

1,039,310.90

977,952.77

169,604.54

991,579.51

1,205,736.41

190,963.00

991,579.51

2,031,179.98

210,608.47

1,039,310.90

Precios a agosto del 2014 M.N.

CCIONAL)
Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

($)

($)

7,602.45

10,573.39

4,973.67

964,391.45

16,952.59

8,490.04

12,102.96

5,476.08

1,022,390.36

23,442.28

7,602.45

10,573.39

4,973.67

984,505.16

16,952.59

8,490.04

12,102.96

5,476.08

1,061,278.03

23,442.28

7,602.45

10,573.39

4,973.67

1,024,941.95

19,261.82

8,490.04

12,102.96

5,476.08

1,099,637.48

23,442.28

19,631.06

26,102.50

11,641.20

1,509,983.36

29,858.94

20,518.65

27,632.06

12,143.61

1,605,535.45

36,348.63

21,928.93

30,062.35

12,941.88

1,997,824.88

54,681.45

19,631.06

26,102.50

11,641.20

1,570,324.48

29,858.94

20,518.65

27,632.06

12,143.61

1,722,198.46

36,348.63

21,928.93

30,062.35

12,941.88

2,066,694.12

54,681.45

19,631.06

26,102.50

11,641.20

1,691,634.86

36,786.61

20,518.65

27,632.06

12,143.61

1,837,276.82

36,348.63

21,928.93

30,062.35

12,941.88

2,326,949.60

54,681.45

37,673.97

49,396.16

21,642.49

2,458,263.73

49,218.45

38,561.58

50,925.71

22,144.90

2,610,145.68

55,708.13

39,971.85

53,356.01

22,943.18

3,309,204.73

80,968.64

37,673.97

49,396.16

21,642.49

2,578,945.98

49,218.45

38,561.58

50,925.71

22,144.90

2,843,471.68

55,708.13

39,929.76

53,247.46

22,548.88

3,445,500.18

80,968.64

37,673.97

49,396.16

21,642.49

2,821,566.74

63,073.79

38,561.58

50,925.71

22,144.90

3,073,628.41

55,708.13

39,971.85

53,356.01

22,943.18

3,967,454.19

80,968.64

Precios a agosto del 2014 M.N.

TA)
Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

($)

($)

7,602.45

10,573.39

4,973.67

733,903.36

16,952.59

8,490.04

12,102.96

5,476.08

791,902.26

23,442.28

7,602.45

10,573.39

4,973.67

754,017.07

16,952.59

8,490.04

12,102.96

5,476.08

830,789.93

23,442.28

7,602.45

10,573.39

4,973.67

794,453.86

19,261.82

8,490.04

12,102.96

5,476.08

869,149.38

23,442.28

19,631.06

26,102.50

11,641.20

1,197,559.10

29,858.94

20,518.65

27,632.06

12,143.61

1,293,111.19

36,348.63

21,928.93

30,062.35

12,941.88

1,685,400.62

54,681.45

19,631.06

26,102.50

11,641.20

1,257,900.22

29,858.94

20,518.65

27,632.06

12,143.61

1,409,774.20

36,348.63

21,928.93

30,062.35

12,941.88

1,754,269.86

54,681.45

19,631.06

26,102.50

11,641.20

1,379,210.60

36,786.61

20,518.65

27,632.06

12,143.61

1,524,852.56

36,348.63

21,928.93

30,062.35

12,941.88

2,014,525.34

54,681.45

37,673.97

49,396.16

21,642.49

1,852,472.66

49,218.45

38,561.58

50,925.71

22,144.90

2,004,354.61

55,708.13

39,971.85

53,356.01

22,943.18

2,703,413.66

80,968.64

37,673.97

49,396.16

21,642.49

1,973,154.91

49,218.45

38,561.58

50,925.71

22,144.90

2,237,680.61

55,708.13

39,971.85

53,356.01

22,943.18

2,841,152.15

80,968.64

37,673.97

49,396.16

21,642.49

2,215,775.67

63,073.79

38,561.58

50,925.71

22,144.90

2,467,837.34

55,708.13

39,971.85

53,356.01

22,943.18

3,361,663.12

80,968.64

Precios a agosto del 2014 M.N.

Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

($)

($)

7,602.45

10,573.39

4,973.67

737,217.25

16,952.59

8,490.04

12,102.96

5,476.08

795,216.15

23,442.28

7,602.45

10,573.39

4,973.67

757,330.94

16,952.59

8,490.04

12,102.96

5,476.08

834,103.81

23,442.28

7,602.45

10,573.39

4,973.67

797,767.74

19,261.82

8,490.04

12,102.96

5,476.08

872,463.26

23,442.28

19,631.06

26,102.50

11,641.20

1,234,723.59

29,858.94

20,518.65

27,632.06

12,143.61

1,330,275.69

36,348.63

21,928.93

30,062.35

12,941.88

1,717,458.89

54,681.45

19,631.06

26,102.50

11,641.20

1,295,064.71

29,858.94

20,518.65

27,632.06

12,143.61

1,446,938.69

36,348.63

21,928.93

30,062.35

12,941.88

1,786,328.13

54,681.45

19,631.06

26,102.50

11,641.20

1,416,375.09

36,786.61

20,518.65

27,632.06

12,143.61

1,562,017.05

36,348.63

21,928.93

30,062.35

12,941.88

2,046,583.61

54,681.45

37,673.97

49,396.16

21,642.49

1,884,546.43

49,218.45

38,561.58

50,925.71

22,144.90

2,036,428.40

55,708.13

39,971.85

53,356.01

22,943.18

2,739,120.93

80,968.64

37,673.97

49,396.16

21,642.49

2,005,228.69

49,218.45

38,561.58

50,925.71

22,144.90

2,269,754.39

55,708.13

39,971.85

53,356.01

22,943.18

2,876,859.42

80,968.64

37,673.97

49,396.16

21,642.49

2,247,849.44

63,073.79

38,561.58

50,925.71

22,144.90

2,499,911.12

55,708.13

39,971.85

53,356.01

22,943.18

3,397,370.39

80,968.64

Cargos de construccin de redes subterraneas

Pre

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE COBRE)(NO URBANIZADA)


Descripcin

Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Supervision

($)

($)

($)

($)

($)

1C-1F-2H-13 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

322,584.13

31,490.15

341,822.16

7,602.45

10,573.39

1C-1F-2H-13 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

407,142.46

37,281.22

341,822.16

8,490.04

12,102.96

1C-1F-2H-23 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

344,051.34

34,432.04

341,822.16

7,602.45

10,573.39

1C-1F-2H-23 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

469,670.53

39,321.56

341,822.16

8,490.04

12,102.96

1C-1F-2H-33 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

400,822.22

34,432.04

341,822.16

7,602.45

10,573.39

1C-1F-2H-33 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

511,945.97

39,321.56

341,822.16

8,490.04

12,102.96

1C-3F-4H-13 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

770,885.30

86,735.91

468,370.42

19,631.06

26,102.50

1C-3F-4H-13 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

957,310.02

98,753.93

468,370.42

20,518.65

27,632.06

1C-3F-4H-13 kV500 KCM-CU-XLP


(NO URBANIZADO)

2,096,700.46

122,967.50

488,799.22

21,928.93

30,062.35

1C-3F-4H-23 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

835,286.95

95,561.57

468,370.42

19,631.06

26,102.50

1C-3F-4H-23 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

1,144,894.24

104,874.95

468,370.42

20,518.65

27,632.06

1C-3F-4H-23 kV500 KCM-CU-XLP


(NO URBANIZADO)

2,262,223.34

122,967.50

488,799.22

21,928.93

30,062.35

1C-3F-4H-33 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

1,005,599.59

95,561.57

468,370.42

19,631.06

26,102.50

1C-3F-4H-33 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

1,271,720.54

104,874.95

468,370.42

20,518.65

27,632.06

1C-3F-4H-33 kV500 KCM-CU-XLP


(NO URBANIZADO)

1,746,879.05

142,516.82

488,799.22

21,928.93

30,062.35

2C-3F-4H-13 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

1,447,279.32

169,604.54

728,436.13

37,673.97

49,396.16

2C-3F-4H-13 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

1,786,503.64

190,963.00

728,436.13

38,561.58

50,925.71

2C-3F-4H-13 kV500 KCM-CU-XLP


(NO URBANIZADO)

3,989,054.63

234,333.36

769,699.47

39,971.85

53,356.01

2C-3F-4H-23 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

1,576,082.61

187,255.86

728,436.13

37,673.97

49,396.16

2C-3F-4H-23 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

2,161,672.06

203,205.04

728,436.13

38,561.58

50,925.71

2C-3F-4H-23 kV500 KCM-CU-XLP


(NO URBANIZADO)

4,320,100.40

234,333.36

769,699.47

39,971.85

53,356.01

2C-3F-4H-33 kV1/0 AWG-CU-XLP


(NO URBANIZADO)

1,916,707.90

187,255.86

728,436.13

37,673.97

49,396.16

2C-3F-4H-33 kV3/0 AWG-CU-XLP


(NO URBANIZADO)

2,415,324.66

203,205.04

728,436.13

38,561.58

50,925.71

2C-3F-4H-33 kV500 KCM-CU-XLP


(NO URBANIZADO)

3,289,411.81

273,431.98

769,699.47

39,971.85

53,356.01

NOTA:
Estos costos no
incluyen IVA

Costo por conexin


de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 624.08

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DISTRIBUCI


Descripcin

1C-1F-2H-13 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)


1C-1F-2H-13 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-23 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-23 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-33 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-1F-2H-33 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-13 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-23 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
1C-3F-4H-33 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-13 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-23 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-1/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-3/0 AWG-CU-XLP (PERFORACION DIRECCIONAL)
2C-3F-4H-33 kV-500 AWG-CU-XLP (PERFORACION DIRECCIONAL)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DISTR


Descripcin

1C-1F-2H-13 kV-1/0 AWG-CU-XLP (CON BANQUETA)


1C-1F-2H-13 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-1F-2H-23 kV-1/0 AWG-CU-XLP (CON BANQUETA)
1C-1F-2H-23 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-1F-2H-33 kV-1/0 AWG-CU-XLP (CON BANQUETA)
1C-1F-2H-33 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-13 kV-1/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-13 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-13 kV-500 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-23 kV-1/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-23 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-23 kV-500 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-33 kV-1/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-33 kV-3/0 AWG-CU-XLP (CON BANQUETA)
1C-3F-4H-33 kV-500 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-13 kV-1/0 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-13 kV-3/0 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-13 kV-500 AWG-CU-XLP (CON BANQUETA)

2C-3F-4H-23 kV-1/0 AWG-CU-XLP (CON BANQUETA)


2C-3F-4H-23 kV-3/0 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-23 kV-500 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-33 kV-1/0 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-33 kV-3/0 AWG-CU-XLP (CON BANQUETA)
2C-3F-4H-33 kV-500 AWG-CU-XLP (CON BANQUETA)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

POR KILOMETRO DE LNEA DE DIS


Descripcin

1C-1F-2H-13 kV-1/0 AWG-CU-XLP (ARROYO)


1C-1F-2H-13 kV-3/0 AWG-CU-XLP (ARROYO)
1C-1F-2H-23 kV-1/0 AWG-CU-XLP (ARROYO)
1C-1F-2H-23 kV-3/0 AWG-CU-XLP (ARROYO)
1C-1F-2H-33 kV-1/0 AWG-CU-XLP (ARROYO)
1C-1F-2H-33 kV-3/0 AWG-CU-XLP (ARROYO)
1C-3F-4H-13 kV-1/0 AWG-CU-XLP (ARROYO)
1C-3F-4H-13 kV-3/0 AWG-CU-XLP (ARROYO)
1C-3F-4H-13 kV-500 AWG-CU-XLP (ARROYO)
1C-3F-4H-23 kV-1/0 AWG-CU-XLP (ARROYO)

1C-3F-4H-23 kV-3/0 AWG-CU-XLP (ARROYO)


1C-3F-4H-23 kV-500 AWG-CU-XLP (ARROYO)
1C-3F-4H-33 kV-1/0 AWG-CU-XLP (ARROYO)
1C-3F-4H-33 kV-3/0 AWG-CU-XLP (ARROYO)
1C-3F-4H-33 kV-500 AWG-CU-XLP (ARROYO)
2C-3F-4H-13 kV-1/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-13 kV-3/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-13 kV-500 AWG-CU-XLP (ARROYO)
2C-3F-4H-23 kV-1/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-23 kV-3/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-23 kV-500 AWG-CU-XLP (ARROYO)
2C-3F-4H-33 kV-1/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-33 kV-3/0 AWG-CU-XLP (ARROYO)
2C-3F-4H-33 kV-500 AWG-CU-XLP (ARROYO)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 1 fase :
$ 534.92

Costo por conexin


de lnea de 2
fases : $ 525.63

Costo por conexin


de lnea de 3
fases : $ 713.28

Precios a agosto del 2014 M.N.

UCTORES DE COBRE)(NO URBANIZADA)


Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

4,973.67

719,045.94

16,952.59

5,476.08

812,314.91

25,751.51

4,973.67

743,455.05

16,952.59

5,476.08

876,883.32

25,751.51

4,973.67

800,225.93

16,952.59

5,476.08

919,158.76

25,751.51

11,641.20

1,383,366.39

29,858.94

12,143.61

1,584,728.68

43,276.30

12,941.88

2,773,400.35

54,681.45

11,641.20

1,456,593.70

29,858.94

12,143.61

1,778,433.92

43,276.30

12,941.88

2,938,923.23

54,681.45

11,641.20

1,626,906.35

29,858.94

12,143.61

1,905,260.22

43,276.30

12,941.88

2,443,128.25

54,681.45

21,642.49

2,454,032.62

49,218.45

22,144.90

2,817,534.97

69,563.48

22,943.18

5,109,358.50

80,968.64

21,642.49

2,600,487.23

49,218.45

22,144.90

3,204,945.42

69,563.48

22,943.18

5,440,404.27

80,968.64

21,642.49

2,941,112.52

49,218.45

22,144.90

3,458,598.02

69,563.48

22,943.18

4,448,814.30

80,968.64

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE COBRE)(PERFORACIN DIRECCIONAL)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

322,584.13

31,490.15

724,397.66

407,142.46

37,281.22

724,397.66

344,051.34

34,432.04

724,397.66

469,670.53

39,321.56

724,397.66

400,822.22

34,432.04

724,397.66

511,945.97

39,321.56

724,397.66

770,885.30

86,735.91

1,006,677.35

957,310.02

98,753.93

1,006,677.35

2,096,700.46

122,967.50

1,027,106.16

835,286.95

95,561.57

1,006,677.35

1,144,894.24

104,874.95

1,006,677.35

2,262,223.34

122,967.50

1,027,106.16

1,005,599.59

95,561.57

1,006,677.35

1,271,720.54

104,874.95

1,006,677.35

1,746,879.05

142,516.82

1,027,106.16

1,447,279.32

169,604.54

1,556,047.18

1,786,503.64

190,963.00

1,556,047.18

3,989,054.63

234,333.36

1,597,310.52

1,576,082.61

187,255.86

1,556,047.18

2,161,672.06

203,205.04

1,556,047.18

4,320,100.40

234,333.36

1,597,310.52

1,916,707.90

187,255.86

1,556,047.18

2,415,324.66

203,205.04

1,556,047.18

3,289,411.81

273,431.98

1,597,310.52

NOTA:

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE COBRE)(CON BANQUETA)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

322,584.13

31,490.15

493,909.57

407,142.46

37,281.22

493,909.57

344,051.34

34,432.04

493,909.57

469,670.53

39,321.56

493,909.57

400,822.22

34,432.04

493,909.57

511,945.97

39,321.56

493,909.57

770,885.30

86,735.91

694,253.09

957,310.02

98,753.93

694,253.09

2,096,700.46

122,967.50

714,681.90

835,286.95

95,561.57

694,253.09

1,144,894.24

104,874.95

694,253.09

2,262,223.34

122,967.50

714,681.90

1,005,599.59

95,561.57

694,253.09

1,271,720.54

104,874.95

694,253.09

1,746,879.05

142,516.82

714,681.90

1,447,279.32

169,604.54

950,256.12

1,786,503.64

190,963.00

950,256.12

3,989,054.63

234,333.36

991,519.45

1,576,082.61

187,255.86

950,256.12

2,161,672.06

203,205.04

950,256.12

4,320,100.40

234,333.36

991,519.45

1,916,707.90

187,255.86

950,256.12

2,415,324.66

203,205.04

950,256.12

3,289,411.81

273,431.98

991,519.45

NOTA:

POR KILOMETRO DE LNEA DE DISTRIBUCIN SUBTERRANEA (CONDUCTORES DE COBRE)(ARROYO)


Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

316,325.98

31,490.15

503,481.59

400,884.32

37,281.22

503,481.59

337,793.20

34,432.04

503,481.59

463,412.39

39,321.56

503,481.59

394,564.08

34,432.04

503,481.59

505,687.82

39,321.56

503,481.59

764,627.16

86,735.91

737,675.73

951,051.89

98,753.93

737,675.73

2,087,450.84

122,967.50

755,989.79

829,028.81

95,561.57

737,675.73

NOTA:

1,138,636.10

104,874.95

737,675.73

2,252,973.72

122,967.50

755,989.79

999,341.45

95,561.57

737,675.73

1,265,462.39

104,874.95

737,675.73

1,737,629.43

142,516.82

755,989.79

1,438,029.70

169,604.54

991,579.51

1,777,254.02

190,963.00

991,579.51

3,976,970.47

234,333.36

1,039,310.90

1,566,832.99

187,255.86

991,579.51

2,152,422.45

203,205.04

991,579.51

4,308,016.22

234,333.36

1,039,310.90

1,907,458.28

187,255.86

991,579.51

2,406,075.04

203,205.04

991,579.51

3,277,327.63

273,431.98

1,039,310.90

Precios a agosto del 2014 M.N.

CIONAL)
Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

($)

($)

($)

Costo total KM

Retiro

($)

($)

7,602.45

10,573.39

4,973.67

1,101,621.45

16,952.59

8,490.04

12,102.96

5,476.08

1,194,890.41

25,751.51

7,602.45

10,573.39

4,973.67

1,126,030.56

16,952.59

8,490.04

12,102.96

5,476.08

1,259,458.82

25,751.51

7,602.45

10,573.39

4,973.67

1,182,801.43

16,952.59

8,490.04

12,102.96

5,476.08

1,301,734.27

25,751.51

19,631.06

26,102.50

11,641.20

1,921,673.33

29,858.94

20,518.65

27,632.06

12,143.61

2,123,035.61

43,276.30

21,928.93

30,062.35

12,941.88

3,311,707.28

54,681.45

19,631.06

26,102.50

11,641.20

1,994,900.63

29,858.94

20,518.65

27,632.06

12,143.61

2,316,740.85

43,276.30

21,928.93

30,062.35

12,941.88

3,477,230.16

54,681.45

19,631.06

26,102.50

11,641.20

2,165,213.28

29,858.94

20,518.65

27,632.06

12,143.61

2,443,567.15

43,276.30

21,928.93

30,062.35

12,941.88

2,981,435.18

54,681.45

37,673.97

49,396.16

21,642.49

3,281,643.67

49,218.45

38,561.58

50,925.71

22,144.90

3,645,146.02

69,563.48

39,971.85

53,356.01

22,943.18

5,936,969.55

80,968.64

37,673.97

49,396.16

21,642.49

3,428,098.28

49,218.45

38,561.58

50,925.71

22,144.90

4,032,556.47

69,563.48

39,971.85

53,356.01

22,943.18

6,268,015.32

80,968.64

37,673.97

49,396.16

21,642.49

3,768,723.57

49,218.45

38,561.58

50,925.71

22,144.90

4,286,209.07

69,563.48

39,971.85

53,356.01

22,943.18

5,276,425.35

80,968.64

Precios a agosto del 2014 M.N.

)
Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

($)

($)

7,602.45

10,573.39

4,973.67

871,133.35

16,952.59

8,490.04

12,102.96

5,476.08

964,402.32

25,751.51

7,602.45

10,573.39

4,973.67

895,542.46

16,952.59

8,490.04

12,102.96

5,476.08

1,028,970.73

25,751.51

7,602.45

10,573.39

4,973.67

952,313.34

16,952.59

8,490.04

12,102.96

5,476.08

1,071,246.17

25,751.51

19,631.06

26,102.50

11,641.20

1,609,249.07

29,858.94

20,518.65

27,632.06

12,143.61

1,810,611.35

43,276.30

21,928.93

30,062.35

12,941.88

2,999,283.03

54,681.45

19,631.06

26,102.50

11,641.20

1,682,476.38

29,858.94

20,518.65

27,632.06

12,143.61

2,004,316.60

43,276.30

21,928.93

30,062.35

12,941.88

3,164,805.91

54,681.45

19,631.06

26,102.50

11,641.20

1,852,789.02

29,858.94

20,518.65

27,632.06

12,143.61

2,131,142.89

43,276.30

21,928.93

30,062.35

12,941.88

2,669,010.93

54,681.45

37,673.97

49,396.16

21,642.49

2,675,852.60

49,218.45

38,561.58

50,925.71

22,144.90

3,039,354.95

69,563.48

39,971.85

53,356.01

22,943.18

5,331,178.49

80,968.64

37,673.97

49,396.16

21,642.49

2,822,307.22

49,218.45

38,561.58

50,925.71

22,144.90

3,426,765.41

69,563.48

39,971.85

53,356.01

22,943.18

5,662,224.25

80,968.64

37,673.97

49,396.16

21,642.49

3,162,932.50

49,218.45

38,561.58

50,925.71

22,144.90

3,680,418.00

69,563.48

39,971.85

53,356.01

22,943.18

4,670,634.28

80,968.64

Precios a agosto del 2014 M.N.

Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

Costo total KM

Retiro

($)

($)

($)

($)

($)

7,602.45

10,573.39

4,973.67

874,447.23

16,952.59

8,490.04

12,102.96

5,476.08

967,716.20

25,751.51

7,602.45

10,573.39

4,973.67

898,856.34

16,952.59

8,490.04

12,102.96

5,476.08

1,032,284.62

25,751.51

7,602.45

10,573.39

4,973.67

955,627.22

16,952.59

8,490.04

12,102.96

5,476.08

1,074,560.05

25,751.51

19,631.06

26,102.50

11,641.20

1,646,413.56

29,858.94

20,518.65

27,632.06

12,143.61

1,847,775.86

43,276.30

21,928.93

30,062.35

12,941.88

3,031,341.29

54,681.45

19,631.06

26,102.50

11,641.20

1,719,640.87

29,858.94

20,518.65

27,632.06

12,143.61

2,041,481.10

43,276.30

21,928.93

30,062.35

12,941.88

3,196,864.18

54,681.45

19,631.06

26,102.50

11,641.20

1,889,953.51

29,858.94

20,518.65

27,632.06

12,143.61

2,168,307.39

43,276.30

21,928.93

30,062.35

12,941.88

2,701,069.19

54,681.45

37,673.97

49,396.16

21,642.49

2,707,926.37

49,218.45

38,561.58

50,925.71

22,144.90

3,071,428.72

69,563.48

39,971.85

53,356.01

22,943.18

5,366,885.76

80,968.64

37,673.97

49,396.16

21,642.49

2,854,380.99

49,218.45

38,561.58

50,925.71

22,144.90

3,458,839.19

69,563.48

39,971.85

53,356.01

22,943.18

5,697,931.51

80,968.64

37,673.97

49,396.16

21,642.49

3,195,006.28

49,218.45

38,561.58

50,925.71

22,144.90

3,712,491.78

69,563.48

39,971.85

53,356.01

22,943.18

4,706,341.55

80,968.64

Cargos de construccin de redes subterraneas

Pre

COSTO DE CONSTRUCCIN LNEA DE BAJA TENSIN PARA REDES SUBTERRANEAS (NO URBANIZADA)
Descripcin

Materiales y
equipos de
instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Supervision

($)

($)

($)

($)

($)

120V-1C-0.10km2F-3H-AL-XLP-1/02 (NO
URBANIZADO)

9,166.71

3,608.09

35,523.30

1,055.77

1,862.80

120V-1C-0.10km2F-3H-AL-XLP-3/01/0 (NO
URBANIZADO)

11,940.53

3,851.85

35,523.30

1,160.35

2,000.95

220V-1C-0.10km3F-4H-AL-XLP-1/02 (NO
URBANIZADO)

12,654.20

4,123.25

37,368.12

1,212.63

2,070.04

220V-1C-0.10km3F-4H-AL-XLP-3/01/0 (NO
URBANIZADO)

15,951.02

4,828.87

37,368.12

1,317.21

2,208.20

220V-1C-0.10km3F-4H-AL-XLP-3504/0 (NO
URBANIZADO)

27,166.50

5,492.24

37,368.12

1,317.21

2,208.20

NOTA:
Estos costos no
incluyen IVA
Costo por conexin
de lnea de 2 fases
3 hilos : $ 534.92

Costo por conexin


de lnea de 3 fases
4 hilos : $ 713.10

Pre

COSTO DE CONSTRUCCIN LNEA DE BAJA TENSIN PARA REDES SUBTERRANEAS (PERFORACI DIRECCIONAL)
Descripcin

Materiales y
equipos de
instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Supervision

($)

($)

($)

($)

($)

120V-1C-0.10km2F-3H-AL-XLP-1/02 (PHD)

9,166.71

3,608.09

76,030.85

1,055.77

1,862.80

120V-1C-0.10km2F-3H-AL-XLP-3/01/0 (PHD)

11,940.53

3,851.85

76,030.85

1,160.35

2,000.95

220V-1C-0.10km3F-4H-AL-XLP-1/02 (PHD)

12,654.20

4,123.25

77,875.67

1,212.63

2,070.04

220V-1C-0.10km3F-4H-AL-XLP-3/01/0 (PHD)

15,951.02

4,828.87

77,875.67

1,317.21

2,208.20

220V-1C-0.10km3F-4H-AL-XLP-3504/0 (PHD)

27,166.50

5,492.24

77,875.67

1,317.21

2,208.20

NOTA:
Estos costos no
incluyen IVA
Costo por conexin
de lnea de 2 fases
3 hilos : $ 534.92

Costo por conexin


de lnea de 3 fases
4 hilos : $ 713.10

Pre

COSTO DE CONSTRUCCIN LNEA DE BAJA TENSIN PARA REDES SUBTERRANEAS (CON BANQUETA)

Descripcin

Materiales y
equipos de
instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Supervision

($)

($)

($)

($)

($)

120V-1C-0.10km2F-3H-AL-XLP-1/02 (CON
BANQUETA)

9,166.71

3,608.09

50,330.44

1,055.77

1,862.80

120V-1C-0.10km2F-3H-AL-XLP-3/01/0 (CON
BANQUETA)

11,940.53

3,851.85

50,330.44

1,160.35

2,000.95

220V-1C-0.10km3F-4H-AL-XLP-1/02 (CON
BANQUETA)

12,654.20

4,123.25

52,175.26

1,212.63

2,070.04

220V-1C-0.10km3F-4H-AL-XLP-3/01/0 (CON
BANQUETA)

15,951.02

4,828.87

52,175.26

1,317.21

2,208.20

220V-1C-0.10km3F-4H-AL-XLP-3504/0 (CON
BANQUETA)

27,166.50

5,492.24

52,175.26

1,317.21

2,208.20

NOTA:
Estos costos no
incluyen IVA
Costo por conexin
de lnea de 2 fases
3 hilos : $ 534.92

Costo por conexin


de lnea de 3 fases
4 hilos : $ 713.10

COSTO DE CONSTRUCCIN L
Descripcin

120V-1C-0.10km-2F-3H-AL-XLP-1/0-2 (ARROYO)
120V-1C-0.10km-2F-3H-AL-XLP-3/0-1/0 (ARROYO)
220V-1C-0.10km-3F-4H-AL-XLP-1/0-2 (ARROYO)
220V-1C-0.10km-3F-4H-AL-XLP-3/0-1/0 (ARROYO)
220V-1C-0.10km-3F-4H-AL-XLP-350-4/0 (ARROYO)

Estos costos no
incluyen IVA
Costo por conexin
de lnea de 2 fases
3 hilos : $ 534.92

Costo por conexin


de lnea de 3 fases
4 hilos : $ 713.10

Precios a agosto del 2014 M.N.

SUBTERRANEAS (NO URBANIZADA)


Pruebas para
puesta en
operacin

Costo total
($/100m)

($)

Retiro

($)
708.27

51,924.96

740.04

803.36

55,280.34

740.04

850.9

58,279.15

813.16

945.99

62,619.41

813.16

945.99

74,498.26

813.16

Precios a agosto del 2014 M.N.

ERRANEAS (PERFORACI DIRECCIONAL)


Pruebas para
puesta en
operacin

Costo total
($/100m)

($)

Retiro

($)
708.27

92,432.50

740.04

803.36

95,787.89

740.04

850.9

98,786.69

813.16

945.99

103,126.96

813.16

945.99

115,005.81

813.16

Precios a agosto del 2014 M.N.

SUBTERRANEAS (CON BANQUETA)

Pruebas para
puesta en
operacin

Costo total
($/100m)

($)

Retiro

($)
708.27

66,732.09

740.04

803.36

70,087.47

740.04

850.9

73,086.28

813.16

945.99

77,426.54

813.16

945.99

89,305.39

813.16

COSTO DE CONSTRUCCIN LNEA DE BAJA TENSIN PARA REDES SUBTERRANEAS (ARROYO)


Materiales y
equipos de
instalacin
permanente

Mano de obra

Obra civil

($)

($)

($)

NOTA:

9,166.71

3,608.09

53,093.73

11,940.53

3,851.85

53,093.73

12,654.20

4,123.25

55,360.48

15,951.02

4,828.87

55,360.48

27,166.50

5,492.24

55,360.48

Precios a agosto del 2014 M.N.

Diseo del proyecto

Supervision

Pruebas para
puesta en
operacin

($)

($)

($)

Costo total
($/100m)

Retiro

($)

1,055.77

1,862.80

708.27

69,495.38

740.04

1,160.35

2,000.95

803.36

72,850.77

740.04

1,212.63

2,070.04

850.9

76,271.50

813.16

1,317.21

2,208.20

945.99

80,611.77

813.16

1,317.21

2,208.20

945.99

92,490.62

813.16

Cargos de construccin de redes subterraneas

Pre

INSTALACIN DE TRANSFORMADORES TIPO PEDESTAL PARA RED SUBTERRANEA (PEDESTAL)


Descripcin

Materiales y equipo
de instalacin
permanente

Mano de obra

Obra civil

Diseo del proyecto

Pruebas para
puesta en
operacion

($)

($)

($)

($)

($)

1T-DRS1-25 kVA13200/7620
(PEDESTAL)

59,668.93

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-37.5 kVA13200/7620
(PEDESTAL)

62,683.60

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-50 kVA13200/7620
(PEDESTAL)

83,855.08

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-75 kVA13200/7620
(PEDESTAL)

70,328.49

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-100 kVA13200/7620
(PEDESTAL)

89,972.58

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-25 kVA22860/13200
(PEDESTAL)

68,833.23

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-37.5 kVA22860/13200
(PEDESTAL)

77,260.39

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-50 kVA22860/13200
(PEDESTAL)

81,691.19

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-75 kVA22860/13200
(PEDESTAL)

87,364.94

5,597.99

5,187.05

766.85

1,215.22

1T-DRS1-100 kVA22860/13200
(PEDESTAL)

90,479.39

5,597.99

5,187.05

766.85

1,215.22

1T-D1SP-25 kVA33000/19050240/120
(PEDESTAL)

67,392.14

5,597.99

5,187.05

766.85

1,215.22

1T-D1SP-37.5 kVA33000/19050240/120
(PEDESTAL)

70,406.81

5,597.99

5,187.05

766.85

1,215.22

1T-D1SP-50 kVA33000/19050240/120
(PEDESTAL)

91,578.30

5,597.99

5,187.05

766.85

1,215.22

1T-D1SP-75 kVA33000/19050240/120
(PEDESTAL)

78,051.70

5,597.99

5,187.05

766.85

1,215.22

1T-D1SP-100 kVA33000/19050240/120
(PEDESTAL)

97,695.81

5,597.99

5,187.05

766.85

1,215.22

1T-DRS3-75 KVA13200/7620
(PEDESTAL)

134,686.59

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-112.5
KVA-13200/7620
(PEDESTAL)

161,312.29

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-150 KVA13200/7620
(PEDESTAL)

171,904.85

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-225 kVA13200/7620
(PEDESTAL)

219,582.42

11,218.40

6,652.89

1,742.81

1,822.80

1T-DCS3-300 KVA13200/7620
(PEDESTAL)

315,673.27

12,209.02

6,652.89

1,742.81

1,822.80

1T-DCS3-500 KVA13200/7620
(PEDESTAL)

325,862.65

12,209.02

6,652.89

1,742.81

1,822.80

1T-DRS3-75 KVA22860/13200
(PEDESTAL)

171,799.14

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-112.5
KVA-22860/13200
(PEDESTAL)

146,227.54

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-150 KVA22860/13200
(PEDESTAL)

189,284.58

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-225 kVA22860/13200
(PEDESTAL)

204,589.18

11,218.40

6,652.89

1,742.81

1,822.80

1T-DCS3-300 KVA22860/13200
(PEDESTAL)

242,941.71

12,209.02

6,652.89

1,742.81

1,822.80

1T-DCS3-500 KVA22860/13200
(PEDESTAL)

413,089.31

12,209.02

6,652.89

1,742.81

1,822.80

1T-DRS3-75 KVA34500/19920
(PEDESTAL)

161,988.12

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-112.5
KVA34500/19920(PEDE
STAL)

188,613.81

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-150 KVA34500/19920(PEDE
STAL)

199,206.37

11,218.40

6,652.89

1,330.75

1,822.80

1T-DRS3-225 kVA34500/19920
(PEDESTAL)

246,883.95

11,218.40

6,652.89

1,742.81

1,822.80

1T-DCS3-300 KVA34500/19920(PEDE
STAL)

330,143.52

12,209.02

6,652.89

1,742.81

1,822.80

1T-DCS3-500 KVA34500/19920(PEDE
STAL)

340,332.90

12,209.02

6,652.89

1,742.81

1,822.80

NOTA:
Estos costos no
incluyen IVA

INSTALACIN DE TRANSFORMA
Descripcion

1T-D1S-25 kVA-13200/7620 (SUMERGIBLE)


1T-D1S-37.5 kVA-13200/7620 (SUMERGIBLE)
1T-D1S-50 kVA-13200/7620 (SUMERGIBLE)
1T-D1S-75 kVA-13200/7620 (SUMERGIBLE)
1T-D1S-100 kVA-13200/7620 (SUMERGIBLE)
1T-D1SS-100 kVA-13200/7620-240/120 (SUMERGIBLE)
1T-D1S-25 kVA-22860/13200 (SUMERGIBLE)
1T-D1S-37.5 kVA-22860/13200 (SUMERGIBLE)

1T-D1S-50 kVA-22860/13200 (SUMERGIBLE)


1T-D1S-75 kVA-22860/13200 (SUMERGIBLE)
1T-D1S-100 kVA-22860/13200 (SUMERGIBLE)
1T-D1SS-100 kVA-22860/13200-240/120 (SUMERGIBLE)
1T-D1SS-25 kVA-33000/19050-240/120 (SUMERGIBLE)
1T-D1SS-37.5 kVA-33000/19050-240/120 (SUMERGIBLE)
1T-D1SS-50 kVA-33000/19050-240/120 (SUMERGIBLE)
1T-D1SS-75 kVA-33000/19050-240/120 (SUMERGIBLE)
1T-D1SS-100 kVA-33000/19050-240/120 (SUMERGIBLE)
1T-D3RSS-150 kVA-13200/7620-220Y/127 (SUMERGIBLE)
1T-D3RSS-75 kVA-13200/7620-220Y/127 (SUMERGIBLE)
1T-D3RSS-112.5 kVA-13200/7620-220Y/127 (SUMERGIBLE)
1T-D3RSS-225 kVA-13200/7620-220Y/127 (SUMERGIBLE)
1T-DCS3-300 kVA-13200/7620 (SUMERGIBLE)
1T-DCS3-500 kVA-13200/7620 (SUMERGIBLE)
1T-D3RSS-150 kVA-22860/13200-220Y/127 (SUMERGIBLE)
1T-D3RSS-75 kVA-22860/13200-220Y/127 (SUMERGIBLE)
1T-D3RSS-112.5 kVA-22860/13200-220Y/127 (SUMERGIBLE)
1T-D3RSS-225 kVA-22860/13200-220Y/127 (SUMERGIBLE)
1T-DCS3-300 kVA-22860/13200 (SUMERGIBLE)
1T-DCS3-500 kVA-22860/13200 (SUMERGIBLE)
1T-D3RSS-150 kVA-33000/19050-220Y/127 (SUMERGIBLE)
1T-D3RSS-75 kVA-33000/19050-220Y/127 (SUMERGIBLE)
1T-D3RSS-112.5 kVA-33000/19050-220Y/127 (SUMERGIBLE)
1T-D3RS-225 kVA-33000/19050-220Y/127 (SUMERGIBLE)
1T-DCS3-300 kVA-34500/19920 (SUMERGIBLE)
1T-DCS3-500 kVA-34500/19920 (SUMERGIBLE)

Estos costos no
incluyen IVA

INSTALACIN DE TRANSFORMADOR
Descripcion

1T-D3RSS-75 kVA-13200/7620-220Y/127 (SUMERGIBLE) ARROYO


1T-D3RSS-112.5 kVA-13200/7620-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-150 kVA-13200/7620-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-225 kVA-13200/7620-220Y/127 (SUMERGIBLE) ARROYO
1T-DCS3-300 kVA-13200/7620 (SUMERGIBLE) ARROYO
1T-DCS3-500 kVA-13200/7620 (SUMERGIBLE) ARROYO
1T-D3RSS-75 kVA-22860/13200-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-112.5 kVA-22860/13200-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-150 kVA-22860/13200-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-225 kVA-22860/13200-220Y/127 (SUMERGIBLE) ARROYO
1T-DCS3-300 kVA-22860/13200 (SUMERGIBLE) ARROYO
1T-DCS3-500 kVA-22860/13200 (SUMERGIBLE) ARROYO
1T-D3RSS-75 kVA-33000/19050-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-112.5 kVA-33000/19050-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RSS-150 kVA-33000/19050-220Y/127 (SUMERGIBLE) ARROYO
1T-D3RS-225 kVA-33000/19050-220Y/127 (SUMERGIBLE) ARROYO
1T-DCS3-300 kVA-34500/19920 (SUMERGIBLE) ARROYO
1T-DCS3-500 kVA-34500/19920 (SUMERGIBLE) ARROYO

Estos costos no
incluyen IVA

Precios a agosto del 2014 M.N.

RED SUBTERRANEA (PEDESTAL)


Conexion

Superv.

Total

($)

($)

($)

171.61

1,210.35

73,817.98

171.61

1,210.35

76,832.65

171.61

1,210.35

98,004.14

171.61

1,210.35

84,477.54

171.61

1,210.35

104,121.64

171.61

1,210.35

82,982.28

171.61

1,210.35

91,409.45

171.61

1,210.35

95,840.24

171.61

1,210.35

101,514.00

171.61

1,210.35

104,628.44

171.61

1,210.35

81,541.20

171.61

1,210.35

84,555.87

171.61

1,210.35

105,727.35

171.61

1,210.35

92,200.75

171.61

1,210.35

111,844.86

514.83

1,865.50

158,091.76

514.83

1,865.50

184,717.47

514.83

1,865.50

195,310.03

514.83

2,660.53

244,194.69

514.83

2,660.53

341,276.15

514.83

2,660.53

351,465.53

514.83

1,865.50

195,204.32

514.83

1,865.50

169,632.72

514.83

1,865.50

212,689.75

514.83

2,660.53

229,201.45

514.83

2,660.53

268,544.59

514.83

2,660.53

438,692.19

514.83

1,865.50

185,393.29

514.83

1,865.50

212,018.99

514.83

1,865.50

222,611.55

514.83

2,660.53

271,496.22

514.83

2,660.53

355,746.40

514.83

2,660.53

365,935.79

INSTALACIN DE TRANSFORMADORES TIPO PEDESTAL PARA RED SUBTERRANEA (SUMERGIBLE)


Materiales y equipo
de instalacion
permanente

Mano de obra

Obra civil

($)

($)

($)

63,278.80

5,992.11

16,479.49

60,932.00

5,992.11

16,479.49

67,344.74

5,992.11

16,479.49

67,684.86

5,992.11

16,479.49

107,298.72

5,992.11

16,479.49

107,298.72

5,992.11

16,479.49

72,365.80

5,992.11

16,479.49

78,472.44

5,992.11

16,479.49

84,269.88

5,992.11

16,479.49

86,250.29

5,992.11

16,479.49

107,805.51

5,992.11

16,479.49

107,805.51

5,992.11

16,479.49

63,278.80

5,992.11

16,479.49

60,932.00

5,992.11

16,479.49

67,344.74

5,992.11

16,479.49

67,684.86

5,992.11

16,479.49

107,298.72

5,992.11

16,479.49

177,168.93

12,400.74

93,074.59

139,950.66

12,400.74

93,074.59

166,576.37

12,400.74

93,074.59

224,846.50

12,400.74

93,074.59

225,329.87

13,391.36

93,074.59

282,531.25

13,391.36

96,640.39

178,689.32

12,400.74

93,074.59

141,471.06

12,400.74

93,074.59

168,096.76

12,400.74

93,074.59

226,366.90

12,400.74

93,074.59

256,404.13

13,391.36

93,074.59

321,490.03

13,391.36

96,640.39

204,470.45

12,400.74

93,074.59

167,252.19

12,400.74

93,074.59

193,877.88

12,400.74

93,074.59

252,148.03

12,400.74

93,074.59

335,407.59

13,391.36

93,074.59

345,596.98

13,391.36

96,640.39

NOTA:

INSTALACIN DE TRANSFORMADORES TIPO PEDESTAL PARA RED SUBTERRANEA (SUMERGIBLE ARROYO)


Materiales y equipo
de instalacion
permanente

Mano de obra

Obra civil

($)

($)

($)

NOTA:

139,950.66

12,400.74

98,401.36

166,576.37

12,400.74

98,401.36

177,168.93

12,400.74

98,401.36

224,846.50

12,400.74

98,401.36

225,329.87

13,391.36

93,074.59

282,531.25

13,391.36

100,614.79

141,471.06

12,400.74

98,401.36

168,096.76

12,400.74

98,401.36

178,689.32

12,400.74

98,401.36

226,366.90

12,400.74

98,401.36

256,404.13

13,391.36

98,401.36

321,490.03

13,391.36

100,614.79

167,252.19

12,400.74

98,401.36

193,877.88

12,400.74

98,401.36

204,470.45

12,400.74

98,401.36

252,148.03

12,400.74

98,401.36

335,407.59

13,391.36

98,401.36

345,596.98

13,391.36

100,614.79

Precios a agosto del 2014 M.N.

Diseo del proyecto

Pruebas para
puesta en
operacion

Conexion

Superv.

Total

($)

($)

($)

($)

($)

808.38

1,245.08

171.61

1,233.37

89,208.84

808.38

1,245.08

171.61

1,233.37

86,862.03

808.38

1,245.08

171.61

1,233.37

93,274.78

808.38

1,245.08

171.61

1,233.37

93,614.89

808.38

1,245.08

171.61

1,233.37

133,228.76

808.38

1,245.08

171.61

1,233.37

133,228.76

808.38

1,245.08

171.61

1,233.37

98,295.84

808.38

1,245.08

171.61

1,233.37

104,402.48

808.38

1,245.08

171.61

1,233.37

110,199.91

808.38

1,245.08

171.61

1,233.37

112,180.32

808.38

1,245.08

171.61

1,233.37

133,735.55

808.38

1,245.08

171.61

1,233.37

133,735.55

808.38

1,245.08

171.61

1,233.37

89,208.84

808.38

1,245.08

171.61

1,233.37

86,862.03

808.38

1,245.08

171.61

1,233.37

93,274.78

808.38

1,245.08

171.61

1,233.37

93,614.89

808.38

1,245.08

171.61

1,233.37

133,228.76

1,455.38

1,912.40

514.83

1,934.59

288,461.45

1,455.38

1,912.40

514.83

1,934.59

251,243.18

1,455.38

1,912.40

514.83

1,934.59

277,868.89

1,867.44

1,912.40

514.83

2,729.61

337,346.11

1,867.44

1,912.40

514.83

2,729.61

338,820.10

1,867.44

1,912.40

514.83

2,729.61

399,587.28

1,455.38

1,912.40

514.83

1,934.59

289,981.84

1,455.38

1,912.40

514.83

1,934.59

252,763.59

1,455.38

1,912.40

514.83

1,934.59

279,389.28

1,867.44

1,912.40

514.83

2,729.61

338,866.51

1,867.44

1,912.40

514.83

2,729.61

369,894.36

1,867.44

1,912.40

514.83

2,729.61

438,546.07

1,455.38

1,912.40

514.83

1,934.59

315,762.97

1,455.38

1,912.40

514.83

1,934.59

278,544.71

1,455.38

1,912.40

514.83

1,934.59

305,170.41

1,867.44

1,912.40

514.83

2,729.61

364,647.64

1,867.44

1,912.40

514.83

2,729.61

448,897.82

1,867.44

1,912.40

514.83

2,729.61

462,653.01

Precios a agosto del 2014 M.N.

Diseo del proyecto

Pruebas para
puesta en
operacion

Conexion

Superv.

Total

($)

($)

($)

($)

($)

1,455.38

1,912.40

514.83

1,934.59

256,569.96

1,455.38

1,912.40

514.83

1,934.59

283,195.66

1,455.38

1,912.40

514.83

1,934.59

293,788.22

1,867.44

1,912.40

514.83

2,729.61

342,672.88

1,867.44

1,912.40

514.83

2,729.61

338,820.10

1,867.44

1,912.40

514.83

2,729.61

403,561.68

1,455.38

1,912.40

514.83

1,934.59

258,090.36

1,455.38

1,912.40

514.83

1,934.59

284,716.05

1,455.38

1,912.40

514.83

1,934.59

295,308.62

1,867.44

1,912.40

514.83

2,729.61

344,193.29

1,867.44

1,912.40

514.83

2,729.61

375,221.14

1,867.44

1,912.40

514.83

2,729.61

442,520.46

1,455.38

1,912.40

514.83

1,934.59

283,871.49

1,455.38

1,912.40

514.83

1,934.59

310,497.18

1,455.38

1,912.40

514.83

1,934.59

321,089.74

1,867.44

1,912.40

514.83

2,729.61

369,974.41

1,867.44

1,912.40

514.83

2,729.61

454,224.60

1,867.44

1,912.40

514.83

2,729.61

466,627.40

Cargos de construccin de redes subterraneas

Pre

SECCIONADORES TIPO PEDESTAL PARA RED SUBTERRANEA


Descripcion

Materiales y equipo
de instalacion
permanentes

Mano de obra

Obra civil

Diseo del proyecto

Supervicion

($)

($)

($)

($)

($)

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 1-200 15 KV
- PE

338,688.94

15,929.14

20,948.41

1,580.00

1,865.49

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 1-200 25 KV
- PE

632,520.44

15,929.14

20,948.41

1,580.00

1,865.49

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 1-200 35 KV
- PE

730,764.60

15,929.14

20,948.41

1,580.00

1,865.49

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 2-200 15
KV- PE

522,241.86

18,466.92

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 15
KV

371,540.63

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 15
KV - BP

419,713.52

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN ACEITE
AISLANTE 4-600
15 KV - BP

313,074.39

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN ACEITE
AISLANTE 4-600
25 KV - BP

664,298.10

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 25
KV

664,298.10

18,466.92

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 25
KV - BP

664,298.10

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 2-200 25
KV- PE

660,141.17

18,466.92

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN ACEITE
AISLANTE / VACIO
2-600. 2-200 35 KV
- PE

1,028,940.30

18,466.92

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 35
KV

720,911.69

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN SF6 4-600 35
KV - BP

765,436.02

19,457.54

20,948.41

2,116.70

2,729.60

SECC STP O STS


EN ACEITE
AISLANTE 4-600
35 KV- BP

733,465.08

19,457.54

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 3 VIAS PARA
13 kV (600/200)

454,049.45

15,929.14

20,948.41

1,580.00

1,865.49

SECCIONADOR
DE 3 VIAS PARA
23 kV (600/200)

632,520.44

15,929.14

20,948.41

1,580.00

1,865.49

SECCIONADOR
DE 3 VIAS PARA
33 kV (600/200)

713,785.06

15,929.14

20,948.41

1,580.00

1,865.49

SECCIONADOR
DE 4 VIAS PARA
13 kV (600/200)

615,000.86

18,466.92

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 4 VIAS PARA
23 kV (600/200)

676,118.91

18,466.92

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 4 VIAS PARA
33 kV (600/200)

899,696.09

18,466.92

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 4 VIAS PARA
13 kV (600/600)

367,314.68

19,457.54

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 4 VIAS PARA
23 kV (600/600)

664,298.10

19,457.54

20,948.41

2,116.70

2,729.60

SECCIONADOR
DE 4 VIAS PARA
33 kV (600/600)

768,837.18

19,457.54

20,948.41

2,116.70

2,729.60

SECC CON
TRANSF. AUTOM.
SF6 2-600, 1-200
15 KV-PE

493,129.27

15,929.14

20,948.41

1,580.00

1,865.49

SECC CON
TRANSF. AUTOM.
SF6 2-600, 1-200
25 KV-PE

652,121.96

15,929.14

20,948.41

1,580.00

1,865.49

SECC CON
TRANSF. AUTOM.
SF6 2-600, 1-200
35 KV-PE

765,518.30

15,929.14

20,948.41

1,580.00

1,865.49

SECC CON
TRANSF. AUTOM.
SF6 2-600, 2-200
15 KV-PE

615,000.86

18,466.92

20,948.41

2,116.70

2,729.60

SECC CON
TRANSF. AUTOM.
SF6 2-600, 2-200
25 KV-PE

665,397.52

18,466.92

20,948.41

2,116.70

2,729.60

SECC CON
TRANSF. AUTOM.
SF6 2-600, 2-200
35 KV-PE

860,542.51

18,466.92

20,948.41

2,116.70

2,729.60

NOTA:
Estos costos no
incluyen IVA

Precios a agosto del 2014 M.N.

SUBTERRANEA
Pruebas para
puesta en
operacion

Conexion

Costo total (por


equipo)

($)

($)

($)

1,201.79

772.25

380,986.01

1,201.79

772.25

674,817.52

1,201.79

772.25

773,061.67

1,291.37

1,029.66

568,824.51

1,291.37

1,029.66

419,113.90

1,291.37

1,029.66

467,286.79

1,291.37

1,029.66

360,647.67

1,291.37

1,029.66

711,871.37

1,291.37

1,029.66

710,880.75

1,291.37

1,029.66

711,871.37

1,291.37

1,029.66

706,723.83

1,291.37

1,029.66

1,075,522.96

1,291.37

1,029.66

768,484.97

1,291.37

1,029.66

813,009.29

1,291.37

1,029.66

781,038.35

1,201.79

772.25

496,346.52

1,201.79

772.25

674,817.52

1,201.79

772.25

756,082.14

1,291.37

1,029.66

661,583.51

1,291.37

1,029.66

722,701.57

1,291.37

1,029.66

946,278.75

1,291.37

1,029.66

414,887.96

1,291.37

1,029.66

711,871.37

1,291.37

1,029.66

816,410.45

1,201.79

772.25

535,426.35

1,201.79

772.25

694,419.04

1,201.79

772.25

807,815.38

1,291.37

1,029.66

661,583.51

1,291.37

1,029.66

711,980.17

1,291.37

1,029.66

907,125.17

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE CONECTADORES MULTIPLES DE MEDIA TENSIN


Descripcion

Materiales

Mano de obra

Diseo del proyecto

Supervision

Costo total

($)

($)

($)

($)

($)

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS200A (J3-200 -15
KV)

7,330.53

1,721.64

126.45

149.38

9,328.00

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS200A (J4-200 -15
KV)

9,148.37

2,896.06

126.45

149.38

12,320.27

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS600A (J3-600 -15 Y
25 KV)

8,873.68

3,396.53

126.45

149.38

12,546.04

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS600/200A (2-600/1200 -15 KV)

11,965.19

2,838.23

126.45

149.38

15,079.25

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS600/200A (2-600/2200 -15 KV)

15,982.18

3,194.89

126.45

149.38

19,452.91

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS200A (J3-200 35
KV)

15,254.32

2,539.40

126.45

149.38

18,069.55

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS200A (J6-200 35
KV)

19,436.28

3,609.39

126.45

149.38

23,321.49

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS600A (J3-600 35
KV)

15,336.74

2,838.23

126.45

149.38

18,450.80

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS600/200A (2-600/1200 - 35 KV)

15,187.50

2,838.23

126.45

149.38

18,301.57

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS600/200A (2-600/2200 - 35 KV)

16,975.06

3,194.89

126.45

149.38

20,445.79

CONECTADOR
MULTIPLE MEDIA
TENSION 2 VIAS200A (J2-200 -15
KV)

4,570.35

2,182.73

126.45

149.38

7,028.92

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS200A (J5-200 -15
KV)

17,084.66

3,252.72

126.45

149.38

20,613.21

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS200A (J6-200 -15
KV)

19,436.28

3,609.39

126.45

149.38

23,321.49

CONECTADOR
MULTIPLE MEDIA
TENSION 2 VIAS600A (J2-600 -15 Y
25 KV)

6,814.01

2,481.57

126.45

149.38

9,571.41

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS600A (J4-600 -15 Y
25 KV)

13,690.42

4,311.48

126.45

149.38

18,277.74

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS600A (J5-600 -15 Y
25 KV)

20,399.08

5,226.45

126.45

149.38

25,901.36

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS600A (J6-600 -15 Y
25 KV)

23,149.67

6,141.42

126.45

149.38

29,566.92

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS600/200A (2-600/3200 -15 KV)

22,107.35

3,551.56

126.45

149.38

25,934.74

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS600/200A (2-600/4200 -15 KV)

24,544.74

3,551.56

126.45

149.38

28,372.13

CONECTADOR
MULTIPLE MEDIA
TENSION 2 VIAS200A (J2-200 35
KV)

4,570.35

2,182.73

126.45

149.38

7,028.92

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS200A (J4-200 35
KV)

9,148.37

2,896.06

126.45

149.38

12,320.27

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS200A (J5-200 35
KV)

17,084.66

3,252.72

126.45

149.38

20,613.21

CONECTADOR
MULTIPLE MEDIA
TENSION 2 VIAS600A (J2-600 35
KV)

7,709.42

2,481.57

126.45

149.38

10,466.82

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS600A (J4-600 35
KV)

17,327.16

4,311.48

126.45

149.38

21,914.48

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS600A (J5-600 35
KV)

22,882.44

5,226.45

126.45

149.38

28,384.73

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS600A (J6-600 35
KV)

32,257.00

6,141.42

126.45

149.38

38,674.25

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS600/200A (2-600/3200 - 35 KV)

22,434.74

3,551.56

126.45

149.38

26,262.13

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS600/200A (2-600/4200 - 35 KV)

27,748.44

3,908.22

126.45

149.38

31,932.49

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS200A (J3-200 - 25
KV)

7,330.53

2,539.40

126.45

149.38

10,145.76

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS200A (J4-200 - 25
KV)

9,148.37

2,896.06

126.45

149.38

12,320.27

CONECTADOR
MULTIPLE MEDIA
TENSION 3 VIAS600/200A (2-600/1200 - 25 KV)

8,823.09

2,838.23

126.45

149.38

11,937.15

CONECTADOR
MULTIPLE MEDIA
TENSION 4 VIAS600/200A (2-600/2200 - 25 KV)

15,982.18

3,194.89

126.45

149.38

19,452.91

CONECTADOR
MULTIPLE MEDIA
TENSION 2 VIAS200A (J2-200 - 25
KV)

4,570.35

2,182.73

126.45

149.38

7,028.92

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS200A (J5-200 - 25
KV)

17,084.66

3,252.72

126.45

149.38

20,613.21

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS200A (J6-200 - 25
KV)

19,436.28

3,252.72

126.45

149.38

22,964.83

CONECTADOR
MULTIPLE MEDIA
TENSION 5 VIAS600/200A (2-600/3200 - 25 KV)

19,951.37

3,551.56

126.45

149.38

23,778.76

CONECTADOR
MULTIPLE MEDIA
TENSION 6 VIAS600/200A (2-600/4200 - 25 KV)

24,572.53

3,908.22

126.45

149.38

28,756.58

NOTA:
Estos costos no
incluyen IVA

Costo de construccin de redes subterraneas

COSTO DE BANCO DE DUCTOS


Descripcion

PVC PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S1B-PVC)


PVC PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S2B-PVC)

PVC PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S3B-PVC)

PVC PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S4B-PVC)

PVC PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S6B-PVC)

PVC PARA BAJA TENSION BAJO ARROYO (CFE-TN-S1A-PVC)

PVC PARA BAJA TENSION BAJO ARROYO (CFE-TN-S2A-PVC)

PVC PARA BAJA TENSION BAJO ARROYO (CFE-TN-S3A-PVC)

PVC PARA BAJA TENSION BAJO ARROYO (CFE-TN-S4A-PVC)

PVC PARA BAJA TENSION BAJO ARROYO (CFE-TN-S6A-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P1B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P2B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P3B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P4B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P6B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P9B-PVC)

PVC PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P12B-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P1A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P2A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P3A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P4A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P6A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P9A-PVC)

PVC PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P12A-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO BANQUETA (CFE-TN-S3B/P6B-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S3B/P9B-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO BANQUETA (CFE-TN-S6B/P6B-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S3A/P6A-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S3A/P9A-PVC)

PVC PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S6A/P6A-PVC)

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S1B-PAD-PADC)

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S2B-PAD-PADC)

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S3B-PAD-PADC)

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S4B-PAD-PADC)

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TN-S6B-PAD-PADC)

PAD PARA BAJA TENSION BAJO ARROYO (CFE-TN-S1A-PAD-PADC)

PAD PARA BAJA TENSION BAJO ARROYO (CFE-TN-S2A-PAD-PADC)

PAD PARA BAJA TENSION BAJO ARROYO (CFE-TN-S3A-PAD-PADC)

PAD PARA BAJA TENSION BAJO ARROYO (CFE-TN-S4A-PAD-PADC)

PAD PARA BAJA TENSION BAJO ARROYO (CFE-TN-S6A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P1B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P2B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P3B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P4B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P6B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P9B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TN-P12B-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P1A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P2A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P3A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P4A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P6A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P9A-PAD-PADC)

PAD PARA MEDIA TENSION BAJO ARROYO (CFE-TN-P12A-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO BANQUETA (CFE-TN-S3B/P6B-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO BANQUETA (CFE-TN-S3B/P9B-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S3A/P6A-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO BANQUETA (CFE-TN-S6B/P6B-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S3A/P9A-PAD-PADC)

PAD PARA MEDIA Y BAJA TENSION BAJO ARROYO (CFE-TN-S6A/P6A-PAD-PADC)

PAD PHD 12 VIAS MEDIA TENSION

PAD PHD 9 VIAS MEDIA TENSION

PAD PHD 6 VIAS MEDIA TENSION

PAD PHD 3 VIAS MEDIA TENSION

PAD PHD 1 VIA MEDIA TENSION

PAD PHD 2 VIAS BAJA TENSION

PAD PHD 1 VIA BAJA TENSION

PAD PARA BAJA TENSION (CFE-TNFMAR-S1-PAD-PADC) AREA NO URBANIZADA

PAD PARA MEDIA TENSION (CFE-TNFMAR-P1-PAD-PADC) AREA NO URBANIZADA

PAD PARA MEDIA TENSION (CFE-TNFMAR-P3-PAD-PADC) AREA NO URBANIZADA

PAD PARA MEDIA TENSION (CFE-TNFMAR-P6-PAD-PADC) AREA NO URBANIZADA

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TNFMAR-S2B-PAD-PADC) AREA NO URBANIZADA

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TNFMAR-S3B-PAD-PADC) AREA NO URBANIZADA

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TNFMAR-S4B-PAD-PADC) AREA NO URBANIZADA

PAD PARA BAJA TENSION BAJO BANQUETA (CFE-TNFMAR-S6B-PAD-PADC) AREA NO URBANIZADA

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TNFMAR-P2B-PAD-PADC) AREA NO URBANIZADA

PAD PARA MEDIA TENSION BAJO BANQUETA (CFE-TNFMAR-P4B-PAD-PADC) AREA NO URBANIZADA

NOTA:
Estos costos no incluyen IVA

Precios a agosto del 2014 M.N.

Costo total
(Metro)
($)
499.56
726.49

948.03

1,172.43

1,407.72

524.67

769.4

1,008.73

1,250.93

1,474.84

547.05

798.53

1,045.01

1,300.19

1,547.19

2,107.92

2,606.29

571.76

841.95

1,106.42

1,379.61

1,614.29

2,183.73

2,687.80

1,425.29

1,714.50

1,923.78

1,504.94

1,804.80

2,009.15

358.75

450.46

544.34

646.21

762.97

380.14

487.16

596.35

713.54

814.98

382.75

472.21

564.06

664.2

777.25

1,023.41

1,248.61

404.12

508.91

616.06

731.53

829.27

1,075.42

1,300.62

1,022.98

1,275.14

1,142.76

1,180.61

1,327.14

1,300.41

2,343.20

1,960.02

1,325.47

846.79

591.34

719.06

591.34

224.75

245.11

359.64

576.5

320.5

393.37

470.69

581.47

335.68

483.21

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE REGISTROS DE MEDIA TENSIN


Descripcion

Costo total
($)

REGISTRO DE MEDIA TENSION EN BANQUETA TIPO 3 (TNFMAR-RMTB3)

10,704.48

REGISTRO DE MEDIA TENSION EN BANQUETA TIPO 4 (TN-RMTB4)

13,785.75

REGISTRO DE MEDIA TENSION EN ARROYO TIPO 3 NORMA (CFE-TN-RMTA3)

12,879.28

REGISTRO DE MEDIA TENSION EN ARROYO TIPO 4 NORMA (CFE-TN-RMTA4)

17,022.73

REGISTRO DE MEDIA TENSION EN BANQUETA TIPO 4 CON TAPA CUADRADA TIPO (CFE-TN-RMTB4TC)

14,133.13

REGISTRO DE MEDIA TENSION EN BANQUETA TIPO 3 (TN-RMTB3) AREA NO URBANIZADA

9,788.33

REGISTRO DE MEDIA TENSION EN BANQUETA TIPO 4 (TN-RMTB4) AREA NO URBANIZADA

12,428.26

REGISTRO DE MEDIA TENSION EN ARROYO TIPO 3 NORMA (CFE-TN-RMTA3) AREA NO URBANIZADA

11,876.86

REGISTRO DE MEDIA TENSION EN ARROYO TIPO 4 NORMA (CFE-TN-RMTA4) AREA NO URBANIZADA

15,536.83

NOTA:
Estos costos no incluyen IVA

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE REGISTROS DE BAJA TENSIN


Descripcion

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 1 PARA CRUCE DE CALLE TIPO (CFE-TN-RBTBCC1)

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 2 PARA CRUCE DE CALLE TIPO (CFE-TN-RBTBCC2)

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 1 (TN-RBTB1)

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 2 (TN-RBTB2)

REGISTRO DE BAJA TENSION EN ARROYO TIPO 1 (NORMA CFE-TN-RBTA1)

REGISTRO DE BAJA TENSION EN ARROYO TIPO 2 (NORMA CFE-TN-RBTA2)

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 1 PARA CRUCE DE CALLE TIPO (CFE-TNFMAR-RBTBCC1) AREA NO
URBANIZADA

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 2 PARA CRUCE DE CALLE TIPO (CFE-TNFMAR-RBTBCC2) AREA NO
URBANIZADA

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 1 (CFE-TNFMAR-RBTB1) AREA NO URBANIZADA

REGISTRO DE BAJA TENSION EN BANQUETA TIPO 2 (CFE-TNFMAR-RBTB2) AREA NO URBANIZADA

REGISTRO DE BAJA TENSION EN ARROYO TIPO 1 (NORMA CFE-TNFMAR-RBTA1) AREA NO URBANIZADA

REGISTRO DE BAJA TENSION EN ARROYO TIPO 2 (NORMA CFE-TNFMAR-RBTA2) AREA NO URBANIZADA

MURETE SENCILLO DE FIBRA DE VIDRIO

MURETE SENCILLO DE CONCRETO

MURETE DOBLE DE FIBRA DE VIDRIO

MURETE DOBLE DE CONCRETO

NOTA:
Estos costos no incluyen IVA

Precios a agosto del 2014 M.N.

Costo total
($)
3,414.36

4,075.66

3,224.18

3,780.69

3,344.88

4,028.66

3,180.16

3,784.57

2,966.87

3,501.29

3,082.78

3,739.44

2,088.11

1,016.21

2,262.12

1,452.98

Costo de construccin de redes subterraneas

Precios a agosto del 20

COSTO DE POZOS DE VISITA DE MEDIA TENSIN


Descripcion

"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""X"" PARA DOS SALIDAS (NORMA CFE-TNFMARPVMTBX)"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""X"" PARA DOS SALIDAS (NORMA CFE-TN-PVMTAX)"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""P"" (NORMA CFE-TN-PVMTBP)"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""P"" PARA DOS SALIDAS (NORMA CFE-TN-PVMTAP)"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""T"" (NORMA CFE-TN-PVMTBT)"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""T"" (NORMA CFE-TN-PVMTAT)"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""L"" (NORMA CFE-TN-PVMTBL)"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""L"" (NORMA CFE-TN-PVMTAL)"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""X"" PARA DOS SALIDAS CON TAPA CUADRADA "
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""X"" PARA DOS SALIDAS (NORMA CFE-TNFMARPVMTBX) AREA NO URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""X"" PARA DOS SALIDAS (NORMA CFE-TN-PVMTAX)
AREA NO URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""P"" (NORMA CFE-TN-PVMTBP) AREA NO
URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""P"" PARA DOS SALIDAS (NORMA CFE-TN-PVMTAP)
AREA NO URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""T"" (NORMA CFE-TN-PVMTBT) AREA NO
URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""T"" (NORMA CFE-TN-PVMTAT) AREA NO URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN BANQUETA TIPO ""L"" (NORMA CFE-TN-PVMTBL) AREA NO
URBANIZADA"
"POZO DE VISITA PARA MEDIA TENSION EN ARROYO TIPO ""L"" (NORMA CFE-TN-PVMTAL) AREA NO URBANIZADA"

NOTA:
Estos costos no incluyen IVA

Precios a agosto del 2014 M.N.

Costo total
($)
34,574.11
40,404.67
34,046.43
39,733.93
33,107.00
38,837.31
30,867.46
37,507.35
25,163.19
26,042.93
31,446.13
25,824.69
30,995.09
25,206.61
30,607.66
23,378.43
29,976.65

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE BOVEDAS DE MEDIA TENSIN


Descripcion

Costo de Materiales
(sin cables)
($)

BOVEDA PARA TRANSFORMADOR DE 500 KVA. EN BANQUETA NORMA (CFE-TN-BT500B)

124.9

BOVEDA PARA TRANSFORMADOR DE 500 KVA. EN ARROYO NORMA (CFE-TN-BT500A)

124.9

BOVEDA PARA TRANSFORMADOR DE 300 KVA. EN ARROYO NORMA (CFE-TN-BT300A)

124.9

BOVEDA PARA TRANSFORMADOR DE 300 KVA. EN BANQUETA NORMA (CFE-TN-BT300B)

124.9

BOVEDA PARA TRANSFORMADOR MONOFASICO TNBTSB

124.9

NOTA:
Estos costos no incluyen IVA

Mano de Obra
(Civil/Elct)

Costo total

($)

($)

87,457.36

87,602.98

91,054.10

91,199.72

89,051.00

89,196.63

84,230.40

84,376.02

14,913.56

15,059.18

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE BASES PARA TRANSFORMADORES


Descripcion

Costo de Materiales
(sin cables)
($)

BASE PARA TRANSFORMADOR TRIFASICO Y REGISTRO RMTB4 EN BANQUETA NORMA (CFE-BT3FRMTB4)

124.9

BASE PARA TRANSFORMADOR MONOFASICO Y REGISTRO RMTB3 EN BANQUETA NORMA (CFE-BT1FRMTB3)

124.9

BASE PARA TRANSFORMADOR TRIFASICO Y REGISTRO RMTB4 EN ARROYO (CFE-BT3FRMTA4)

124.9

BASE PARA TRANSFORMADOR MONOFASICO EN AREA NO URBANIZADA

124.9

BASE PARA TRANSFORMADOR TRIFASICO EN AREA NO URBANIZADA

124.9

NOTA:
Estos costos no incluyen IVA

Mano de Obra
(Civil/Elct)

Costo total

($)

($)

18,092.45

18,238.07

14,675.07

14,820.69

18,957.84

19,103.46

4,694.16

4,839.79

6,020.72

6,166.34

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO DE MURETES
Descripcion

Costo de Materiales
(sin cables)

Mano de Obra
(Civil/Elct)

($)

($)

MURETE PARA DERIVACION EN MEDIA TENSION NORMA (CFE-TNFMAR-MDMT)

124.9

10,577.46

"MURETE DE 3 VIAS DE 3 "" DIAM.TRANSICION AEREO SUBTERRANEO EN AREA DE SE."

124.9

3,013.57

"MURETE DE 3 VIAS DE 6 "" DIAM.TRANSICION AEREO SUBTERRANEO EN AREA DE SE."

124.9

5,045.27

NOTA:
Estos costos no incluyen IVA

Costo total

($)
10,723.08
3,159.19
5,190.89

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO POR METRO DE CABLE DE POTENCIA, EMPALMES Y TERMINALES DE MEDIA TENSION


Descripcion

Costo de Materiales
(sin cables)

Mano de Obra
(Civil/Elct)

($)

($)

CABLE ALUMINIO XLP CAL. 2, 1/0, 2/0 AWG - 15 KV

64.15

15.86

CABLE ALUMINIO XLP CAL. 3/0 AWG, 250, 350 KCM - 15 KV

75.42

17.72

CABLE ALUMINIO XLP CAL. 500 KCM - 15 KV

149.72

17.72

CABLE ALUMINIO XLP CAL. 2, 1/0, 2/0 AWG - 25 KV

75.38

15.86

CABLE ALUMINIO XLP CAL. 3/0 AWG, 250, 350 KCM - 25 KV

101.54

17.72

CABLE ALUMINIO XLP CAL. 500 KCM - 25 KV

164.45

19.01

CABLE ALUMINIO XLP CAL. 2, 1/0, 2/0 AWG - 35 KV

105.89

15.86

CABLE ALUMINIO XLP CAL. 3/0 AWG, 250, 350 KCM - 35 KV

130.28

17.72

CABLE ALUMINIO XLP CAL. 300 KCM - 35 KV

231.95

19.01

CABLE COBRE XLP CAL. 2, 1/0, 2/0 AWG - 15 KV

168.58

15.86

CABLE COBRE XLP CAL. 3/0 AWG, 250, 350 KCM - 15 KV

206.69

17.72

CABLE COBRE XLP CAL. 500 KCM - 15 KV

478.44

21.51

CABLE COBRE XLP CAL. 2, 1/0, 2/0 AWG - 25 KV

180.84

17.72

CABLE COBRE XLP CAL. 3/0 AWG, 250, 350 KCM - 25 KV

250.8

19.01

CABLE COBRE XLP CAL. 500 KCM - 25 KV

519.24

21.51

CABLE COBRE XLP CAL. 2, 1/0, 2/0 AWG - 35 KV

223.78

17.72

CABLE COBRE XLP CAL. 3/0 AWG, 250, 350 KCM - 35 KV

282.52

19.01

CABLE COBRE XLP CAL. 500 KCM - 35 KV

390

25.63

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 15-1/0

1017.6

818.29

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 15-3/0

1348.8

873.62

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 15-500

2734.72

999.73

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 25-1/0

3096.48

818.29

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 25-3/0

3120

873.62

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 25-500

3340

999.73

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 35-1/0

3230

818.29

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 35-3/0

3350

873.62

EMPALME PARA CABLE DE POTENCIA MONOPOLAR XLP MT 35-300

2583.6

999.73

INDICADOR DE FALLA 200 A

1362

254.16

INDICADOR DE FALLA 600 A

1490

254.16

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 13 KV AL 500

11238.67

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 13 KV AL 750

11718.67

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 25 KV AL 500

18588.67

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 23 KV AL 750

8538.67

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 35 KV AL 500

5058.67

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 3F MT 35 KV AL 750

8455.87

1193.54

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 1F MT 13 KV AL 1/0

1399.61

291.37

TERMINALES PARA TRANSICIONES AEREO SUBTERRANEA 2F MT 13 KV AL 1/0

2177.94

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 13 KV AL 1/0

3725.59

874.12

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 1F MT 13 KV AL 3/0

1656.05

291.37

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 2F MT 13 KV AL 3/0

2690.82

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 15 KV AL 3/0

3725.59

874.12

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 1F MT 25 KV AL 1/0

2125.12

291.37

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 2F MT 25 KV AL 1/0

3628.96

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 25 KV AL 1/0

5132.8

874.12

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 1F MT 25 KV AL 3/0

2530.6

291.37

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 2F MT 25 KV AL 3/0

4439.92

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 25 KV AL 3/0

6349.24

874.12

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 1F MT 35 KV AL 1/0

3170.17

291.37

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 2F MT 35 KV AL 1/0

5719.06

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 35 KV AL 1/0

8267.95

874.12

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 1F MT 35 KV AL 3/0

4860.41

291.37

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 2F MT 35 KV AL 3/0

9099.54

582.75

TERMINALES PARA TRANSICIONES AEREO-SUBTERRANEA 3F MT 35 KV AL 3/0

13338.67

874.12

NOTA:
Estos costos no incluyen IVA

Costo total

($)
97.05
112.8
199.43
110.14
143.25
218.41
145.71
176.76
297.11
218.8
265.85
588
235.71
319.08
635.57
285.77
356.07
490.67
2,334.73
2,798.52
4,591.33
4,758.49
4,863.56
5,297.03
4,914.16
5,131.72
4,415.14
1,944.62
2,093.85
14,778.06
15,337.69
23,347.43
11,630.13

7,572.80
11,533.59
2,040.68
3,357.03
5,570.32
2,339.67
3,955.00
5,570.32
2,886.56
5,048.78
7,210.98
3,359.31
5,994.28
8,629.23
4,104.98
7,485.63
10,866.26
6,075.63
11,426.93
16,778.21

Costo de construccin de redes subterraneas


Precios a agosto del 2014 M.N.

COSTO POR METRO DE CABLE , EMPALMES Y TERMINALES DE BAJA TENSION


Descripcion

Costo de Materiales
(sin cables)

Mano de Obra
(Civil/Elct)

Diseo

($)

($)

($)

CABLE AL-XLP- 2C/1N (1/0-2) AWG

37.05

11.09

3.75

CABLE AL-XLP- 2C/1N (3/0-1/0) AWG

55.24

11.09

3.75

CABLE CU-XLP- 2C/1N (1/0-2) AWG

62.71

13.68

3.75

CABLE CU-XLP- 2C/1N (3/0-1/0) AWG

160.01

17.4

3.75

CABLE AL-XLP- 3C/1N (1/0-2) AWG

52.63

11.09

3.75

CABLE AL-XLP- 3C/1N (3/0-1/0) AWG

74.3

13.68

3.75

CABLE AL-XLP- 3C/1N (350-4/0) AWG/KCM

149.95

17.4

3.75

CABLE CU-XLP- 3C/1N (1/0-2) AWG

103.49

17.4

3.75

CABLE CU-XLP- 3C/1N (3/0-1/0) AWG

124.19

20.69

3.75

CABLE CU-XLP- 3C/1N (350-4/0)

364.02

24.3

3.75

JUEGO DE CONEXION 1/0

50.4

26.2

11.24

JUEGO DE CONEXION 3/0

51.36

26.2

11.24

JUEGO DE CONEXION 350

51.36

26.2

11.24

CONECTADOR MULTIPLE 600 (4)

145

58.34

11.24

CONECTADOR MULTIPLE 600 (6)

152.24

11.24

CONECTADOR MULTIPLE 600 (8)

204.3

58.34

11.24

CONECTADOR MULTIPLE 600 (10)

405

58.34

11.24

ELECTRODO DE TIERRA ACE B T

158.28

212.02

13.57

JUEGO DE CONEXION 2

42.12

JUEGO DE CONEXION 4/0

51.36

26.2

11.24

EMPALME DERIVADOR CON GEL B.T.

175

58.34

EMPALME DERIVADOR TERMOCONTRACTIL B.T.

150

58.34

NOTA:
Estos costos no incluyen IVA

Supervision

Costo total

($)

($)

7.43

74.45

7.43

95.66

7.43

108

7.43

226.66

7.43

92.61

7.43

121.51

7.43

214.93

7.43

160.77

7.43

189.52

7.43

474.2

14.85

132.14

14.85

133.26

14.85

133.26

14.85

287.54

14.85

214.11

14.85

356.67

14.85

590.67

35

550.22

0
14.85

49.11
133.26

285.9

256.75