VWTA-20 PENDING POINTS

SI.NO

CONSTRAINTS

DESCRIPTION
VESPL

BUNKER

BUNKER CHUTE&CASING CORNER PLATE FIT UP & WELDING

II

TEMPORARY SUPPORTS REMOVE WORK

II

MAN HOLE DOOR FIT UP

IV

MORRIE'S WHEEL CHAIN TO BE PROVIDED

FUEL FEEDING SYSTEM

DIVIIDING CHUTE BALANCE SUPPORT WORK

II

PA LINE TO MIXING NOZZLE GASKET FIXING

III

PA LINE SUPPORT WELDING

IV

CROSS COVER FLANGE WITH GASKET FIXING

FUEL LINE DRAIN TO SLIDE GATE WELDING

FURNACE

BALANCE SPORGER HEADER FLANGE JOINT WELDING

II

BOTTOM SUPPORT TIE BEAM BALANCE WELDING

IV

HOPPER ATTENDING PLATFORM FIT UP

FURNACE HOPPER DRAIN PIPING AND KNIFE & SLIDE GATE FIT UP

WATER WALL

DRG. REQUIRED

BAPL

FURNACE BED COIL SEAL BOX

II

WATER WALL ROOF SEAL BOX BALANCE WORK & WELDING

BED MATERIAL BUNKER

BED MATEIAL BUNKER STIFFNER BEAM WELDING

AIRHEATER

AIR HEATER TUBE SHEET BALANCE WELDING

PLATFORM ASSEMBLY

BALANCE PLATFORM WORK AT FIRING FLOOR LEVEL

ROOF TRUSS & SIDE CLADDING

SIDE CLADDING BALNCE WORK

PACKING SLIP REQUIRED FOR


MISSED MATERIALS

MATERIAL REQ

II

ROOF TRUSS ERECTION WORK

PACKING SLIP REQUIRED FOR


MISSED MATERIALS

MATERIAL REQ

III

BALNCE WELDING WORK

ZERO EXPANSION MOVEMENT DIAGRAM

WATER WALL, STEAM DRUM ZERO EXPANSION ARRESTER ERECTION WORK

II

EXPANSION INDICATOR FIT UP

10
I
11

RISER SUPPORT
RISER SUPPORT MODIFICATION WORK

ECONOMISER

ECONOMISER CASING SCALLOPED PLATE TUBE WELDING

II

ECONOMISER INLET & OUTLET HEADER U CLAMP CHANGING

12

MAIN STEAM OUTLET LINK

SAFTY VALVE FIT UP & WELDING

II

THERMOWELL CHANGING

III

SPRING HANGER SUPPORT PLATE FIXING

13

AIR DUCTING

I
14
I
15

BALANCE ALL DUCTING FLANGES OUTER SIDE STRETCH WELDING

PRIMARY AIR SYSTEM ASSEMBLY


ALL DUCTING FLANGES OUTER SIDE STRETCH WELDING

FLUE GAS DUCTING ASSEMBLY

AIR HEATER TO ESP DUCTING SUPPORT ERECTION

II

ID FAN TO CHIMNEY DUCTING & SUPPORT ERECTION WORK

16

FEED PIPING SUPPORT

17

HP DOSING PIPING

18
I
19

HP DOSING PIPING BALANCE WELDING WORK

REMOTE PRESSURE GAUGE EXTENSION PIPING


VALVE & CONDENSING LOOP ASSEMBLY FIT UP & WELDING WORK

START UP OIL FIRING SYSTEM

PIPING WELDING WORK

II

PIPING SUPPORT

20

CHIMNEY REQUIRED

FEED PIPING

II

FOUNDATION REQ

COOLING WATER PIPING

REDUSER REQ

FEED PUMP COOLING WATER INLET & OUTLET PIPING FIT UP & WELDING

INSERT PLATE REQ

II

FEED PUMP COOLING WATER INLET & OUTLET PIPING SUPPORT

INSERT PLATE REQ

III

SAMPLE COOLER COOLING WATER INLET PIPING & SUPPORT

21

BOILER SAFTY VALVE EXHAUST PIPING

MAIN STEAM LINE DRIP PAN FIT UP & WELDING

II

BALNCE SUPPORT ERECTION & WELDING

22

NON IBR DRAIN PIPING

ALL DRAIN PIPING FIT UP & WELDING

II

ALL DRAIN PIPING SUPPORTWORK & WELDING

23

DEAERATOR
2 ELBOW REQUIRED

DEAERATOR TO FEED PUMP SUCTION PIPING BALANCE WORK & SUPPORT

II

INITIAL HEATING & STEAM INLET PIPING SUPPORT

INSERT PLATE REQ

III

MAKE UP WATER INLET PIPING & SUPPORT

INSERT PLATE REQ

IV

DEAERATOR STROAGE TANK OVERFLOW & DRAIN PIPING

INSERTPLATE REQ

DEAERATOR IMPULSE PIPING

VII

BALANCE PLATFORM WORK

VIII

LP DOSING ERECTION

INSERT PLATE REQ

IX

LP DOSING PIPING

INSERT PLATE REQ

AUTO MINIMUM REIRCULATION BALNCE LEAK PIPING SUPPORT WORK.

INSERT PLATE REQ

24

IMPULSE PIPING

INSERT PLATE REQ

STEAM DRUM LEVEL TRANSMITTER IMPULSE PIPING WORK

II

IMPULSE PIPING BALANCE SUPPORT

1"TO 1/2" CONNECTOR


REQ {QTY-2 NOS)

25

ROTARY EQUIPEMENT.

FD FAN FINAL ALIGNMANT

FULL GROUTING,

II

PA FAN FINAL ALIGNMENT

FULL GROUTING,

III

FEED PUMP FINAL ALIGNMENT

FULL GROUTING,

IV

ID FAN ALIGNMNET & FINAL ALIGNMENTT

FULL GROUTING,

26

ESP

HOPPER BALANCE WELDING

II

HOPPER PARTITION PLATE BALANCE FIT UP

III

HOPPER PARTITION HAMMER PLATE FIXING

IV

HOPPER PARTITION MAN HOLE DOOR FIT UP WORK

HOPPER SLIDE GATE & RAV FIXING

VI

LONGITIDUNAL WALL SIDE COVERING PLAT FIT UP & WELDING WORK

VII

OUTLET INTERNAL WALKWAY WORK

VIII

COLLECTING ELECTRODE ALIGNMENT

IX

COLLECTING ELECTRODE RAPPING SYSTEM

DISCHARGE RAPPING SYSTEM

XI

GD PLATE LOCKING REMOVING WORK

XII

GD RAPPING SYSTEM

RAV REQ

XIII

BALANCE PLATFORM WORK

XIV

INSULATOR ERECTION WORK

XV

GAS DIVERTION PLATE FIT UP & WELDING

XVI

BLOWER WITH HEATER ERECTION & PIPING WORK

XVII

HT DUCT ERECTION & HT CONNECTION

XVIII

SEALING ROOF ERECTION & WELDING

XIX

RAIN ROOF ERECTION & WELDING

XX

ROOF BEAM MAN HOLE DOOR FIT UP & WELDING

27

TEMPORARY SUPPORTS REMOVING

BOILER TEMPORARY SUPPORTS

II

ESP TEMPORARY SUPPORTS

28
I
29

REFRACTORY
WATER WALL ROOF HEADER REFRACTORY WORK

INSULATION

ESP INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

II

ESP TOID FAN AND ID FAN TO CHIMNEY FLUE GAS DUCTING INSULATION
WORK

CONTRACTOR & BALANCE


MATERIAL REQ

III

WATER WALL FINSIHING INSULATION WORKS

CONTRACTOR & BALANCE


MATERIAL REQ

IV

SUPER HEATER COIL BALANCE INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

ECONOMISER INLET & OUTLET HEADER INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

VI

FA HEADER TO COMPARTMENT HEADER DUCTING INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

VII

All INTEGRAL PIPING INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

VIII

DEAERATOR INSULATION & DEAERATOR PIPING

CONTRACTOR & BALANCE


MATERIAL REQ

IX

ALL FAN INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

BLOW DOWN TANK INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

30

ROOF SHEETING

31

FINAL PAINTING

REMARKS
UTTKAL ENGINEERS

MAN POWER SHORTAGE


MAN POWER SHORTAGE

MAN POWER SHORTAGE


MAN POWER SHORTAGE
MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER SHORTAGE,


WORK is an U/P.
WELDING ELECTRODE
MAN POWER SHORTAGE
MAN POWER SHORTAGE EXTRA WORK
M20 washerX8mm thk -32 Nos required

MAN POWER SHORTAGE


MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER SHORTAGE MATRIAL SHORTAGE


MAN POWER SHORTAGE MATERIAL SHORTAGE

MAN POWER SHORTAGE

INSULATION WORK COMPLETED IN THIS PLACES

MAN POWER SHORTAGE

REWORK

MAN POWER SHORTAGE

REWORK

MAN POWER SHORTAGE

MATERIAL AVAILABLE
REWORK
REWORK

MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MAN POWER

MAN POWER REQ

MATERIAL AVAILABLE

MATERIAL AVAILABLE
MATERIAL AVAILABLE
MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

material available
MAN POWER SHORTAGE

material available

material available
material available

MATERIAL AVAILABLE

MILWRIGHT FITTER
MILWRIGHT FITTER
MILWRIGHT FITTER
MILWRIGHT FITTER

WEEKLY 2 HOURS ONLY AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MATERIAL AVAILABLE
MATERIAL AVAILABLE
MAN POWER REQ

MATERIAL AVAILABLE
MATERIAL AVAILABLE

MAN POWER REQ

ALIGNMENT IS VERY POOR.REALIGNMENT MUST


REQUIRED

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ


MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

WORK IS an U/P.

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ


MAN POWER REQ

SUFFOLDING ARRANGEMENT ISSUE

MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN


WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.

MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN


WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAN POWER REQ

MAN POWER REQ

SHOULD BE COMPLETE THE ROOF &SIDE CLADDING


STRUCTURE

MATERIAL AVAILABLE

S.NO

S.NO

S.NO

MAN POWER REQUIREMENT FOR BOILER


DESCRIPTION
NOS
1 FITTER(PIPING)
1NOS
2 FITTER (STRUCTURE)
2 NOS
3 GRINDER
2 NOS
4 RIGER
03 NOS
5 WELDER
03 NOS
6 HELPER
03 NOS
TOTAL
14 NOS
MAN POWER REQUIREMENT FOR ESP
DESCRIPTION
NOS
1 FITTER
1 NOS
2 WELDER
03NOS
3 RIGER
01 NOS
4 HELPER
02 NOS
TOTAL
07NOS
AVAILABLE MAN POWER DETAIL IN BOILER
DESCRIPTION
NOS
1 SUPERVISIOR
1NOS
1 FITTER
2NOS
2 WELDER
02NOS
3 RIGER
01 NOS
4 HELPER
05 NOS
TOTAL
12 NOS

MAN POWER & TOOLS REQUIREMNET FOR INSU


1 TOTAL
15 NOS WITH NECESSOR

1 TOTAL

MAN POWER REQUIREMENT FOR SHEETIN


15 NOS WITH NECESSOR

OR BOILER
S.NO

TOOLS REQUIREMENT FROM UTKAL ENGG


DESCRIPTION
NOS
1 WELDING M/C
3+1 RECTIFIER
2 GRINDING M/C AG4
02 NOS
3 SPRIT LEVEL
04 NOS
4 RIGHT ANGLE
05 NOS
5 WATER LEVEL
03 NOS
6 LIGHT
04NOS

FOR ESP

IBR FORMALTIES ISSUE(UTKAL ENGG SCOPE)


1.VWHO054BALANCE RADIOGRAPHY FILM & REPORT
2.VWHO 052,VWHO 053 BALANCE RADIOGRAHY ARRANGEMENT & SR A
3.VWTA 020 PIPING RADIOGRAPHY ARRANGEMENT.

IN BOILER

UIREMNET FOR INSULATION


5 NOS WITH NECESSORY TOOLS

UIREMENT FOR SHEETING


5 NOS WITH NECESSORY TOOLS

S.NO

AVAILABLE MAN POWER DETAIL IN ESP


DESCRIPTION
NOS
1 FITTER
1NOS
2 WELDER
0 NOS
3 RIGER
01 NOS
4 HELPER
02 NOS
TOTAL
04NOS

AVAILABLE
4NOS
1NOIS
I NOS
NIL
01 NOS

L ENGG SCOPE)

RRANGEMENT & SR ARRANGEMENT