M/S.VEESONS ENERGY SYSTEMS PVT.LTD.

TRICHY-15
CLIENT:
PROJECT :
S.NO DESCRIPTION

BOILER OPERATING PARAMETERS(WHRB)

M/s.S.KSARAWAGI CO. (P) LTD.


11 TPH@ 66 Kg/cm(a) 4905 C

1 STEAM FLOW
2 STEAM LINE PRESSURE
3 FINAL STEAM TEMP
4 FEED WATER FLOW
5 FEED LINE PRESSURE
6 DRUM PRESSURE
7 DESIGN GAS FLOW RATE
8 AT RADIANT CHAMBER I/L
9 AT SCREEN I/L
10 AT SEC. SUPERHEATER I/L
11 AT PRI. HEATER I/L
12 AT EVAPORATOT I I/L
13 AT EVAPORATOT I O/L
14 AT EVAPORATOR II I/L
15 AT EVAPORATOR II O/L
16 AT ECONOMISER I I/L
17 AT ECONOMISER I O/L
18 FEED WATER TEMP. ECO I I/L
19 FEED WATER TEMP. ECO I O/L
20 STEAM TEMP. AT PSH I/L
21 STEAM TEMP. AT PSH O/L
22 STEAM TEMP. AT DSH I/L
23 STEAM TEMP. AT DSH O/L
24 STEAM TEMP. AT SSH I/L
25 SPRAY CONGNTROLVALVE OPENING
26 FEED CONTROL VALVE OPEENING
27 DRUM LEVEL
28 FEED PUMP 1 POWER 160 KW
29 FEED PUMP 2 POWER 160 KW

UNIT
TPH
Kg/cm(a)
C
TPH
Kg/cm
Kg/cm(a)
Nm/hr
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
%
%
%
Amps
Amps

BOILER MAKER NO:


SOURCE :

VWH 038
100 TPD SPONGE IRON KILN FLUE G

BOILER OPERATOR

SHIFT INCHARGE

N KILN FLUE GAS

GE