Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.

1
TEGOSOLAR www.tegolacanadese.com 1

Overlap
TEGOSOLAR

6
PVL68

Dimension Tegosolar tile: 288x44,5 cm Visibile dimension: 2,85x0,385 m = 1,097 m2 Fig. 1


Dimension photovoltaic tile: 285x39,5 cm Overlap 6 cm

KIT 2 - L Profiles pre drilled stick with butyl tape 1 - Cap pre drilled for the 2 - Stainless steel screws
TEGOSOLAR protection of cables
PVL68 Cu 2 - Adhesives with small band

445mm 385mm 420mm 2 - S spacers


15mm
50 15mm
23
Fig. 2 Fig. 3 Fig. 4

CAUTIONS REMOVING THE TRANSPARENT FILM


Tegosolar has its max efficiency when exposed to south. It's consequently suggested to Remove the transparent film on the back of Tegosolar
find the pitches with the best exposure and to organize the tiles distribution so that following the picture (use a cutter for lifting the corner).
they're as much regular as possible by respecting the instructions resumed in Fig. 6 and
'till the needed kW are installed (15 tiles or 17 m² are 1 kWp).
The electrical project should be done by arranging the needed connections to obtain Fig. 5
strings (Tegosolar connected in series) which shall then be connected in parallel to the
inverter.
METHODOLOGY
" Tegosolar should be moved carefully, in order to avoid bending which may This installation system is based on the achievement of two main phases that enable the
deteriorate the support installation of the photovoltaic tile before, and of the connections with cables after. The roofer is
" In case of Tegosolar is applied with nails on nailable roof decks, with slopes higher able to install Tegosolar according to a prior given disposition / drawing. His role shall finish when
than 35% installing the L profiles and waterproofing the connections and consequently the roof;
" For the nails application use large headed roofing nails, stainless steel AISI 304 high connectors shall be left free, in order to permit the electrician to start his work.
adherence. The electrician shall connect the photovoltaic tiles in strings and the strings in parallel to the
" It is possible to apply Tegosolar by torching it on a bituminous membrane such as inverter. He shall protect cables and connectors with the installation of the metal caps screwed
Safety Poly 4 mm, with slopes lower than 35% (19°). to the L profiles. It's clear that all the cables, done with watertight connectors, are on the upper
" Use QUICK CONNECT connectors for the connection of Tegosolar to the inverter side of the roof, and shall always be reachable and inspectable, simply by unscrewing and
(should the existing connectors be cut, the guarantee of Tegosolar on the electric removing the metal cap.
part shall be no longer valid). The waterproofing between two tiles is guaranteed by the butyl applied under the L profiles.
" BEFORE THE INSTALLATION REMOVE THE TRANSPARENT AND ANTI ADHERENCE FILM ON

THE BACK OF THE TILE, AS PER FIG. 5.


Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
MARKING THE ROOF www.tegolacanadese.com 2

Not closer
2 D
than 50 cm
from the valley

3
4 5

A Not closer than 30 cm


from the hip

288cm 1

288cm

288cm
Fig. 6

288cm 288cm

" Mark a line xy orthogonal to the direction of maximum slope of the roof, usually parallel to the
eaves and to the gutter at 44,5 cm from the gutter (orange line) or more generally at 44,5 cm
from the starting point (i.e. yellow line 2 ). D
" Mark along the line xy a point A. This point must respect the scheme of the electrical project.

" Mark points B e C, at either side from A (for example at 150 cm).

" Starting from B and C, by using a chalk line as a compass, mark point D as near as possible to

the Ridge.
" Join A with D.

" Mark parallel to line AD, at a distance of 288 cm, the lines needed for completing the

installation scheme.
" Starting from the line xy, mark horizontal and parallel lines to the line xy, at a distance of 38,5

cm from each other up to the completing of the installation scheme. (Fig. 6B)
" The parts of the roof not interested in the installation of Tegosolar shall be marked following the

installation instructions of the shingles that shall complete the roof and that shall be installed at
the same time, as per the following instructions.
38,5cm
38,5cm
x B A 38,5cm C y
44,5cm Fig. 6B
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1

www.tegolacanadese.com 3

NAILS INSTALLATION Tegosolar: slope limits for installation with nails or torch on
Tegosolar, installed by nails, on a wooden roof deck, becomes a waterproofing layer thanks to the Slope Length of the pitch
overlapping of its elements. This installation method needs a minimal slope of the roof, which has to be of the roof Up to 7 m From 7 to 10 m From 10 to 15 m
related to the length of the pitch. In fact length and slope of the pitch determine the volume of water
More than 40% Nail installation Nail installation Nail installation
which is running on it, and its progressive elongation increases the infiltration risk. Consequently, before
installing with nails, we suggest to have a look at the Table 1. We also remind that these information are From 35% to 40% Nail installation Nail installation
referred to roof decks in a good maintenance status, stable and without subsidence. From 30% to 35% Nail installation
Torch on installation
Up to 30%
Should the slope of the roof and / or its length do not permit to install with nails, the following procedure
shall be done: torch on the surface of the roof (wooden plates, plywood or cement) a plastomeric Tab.1
waterproofing membrane, with polyester reinforcement, 4 mm thick. The membrane shall be selected
with the suitable elongation, according to the type of roof deck. Further than a perfect waterproofing
the selected membrane shall have to assure a good sticking both on the support and on Tegosolar. Left side:
make holes

TORCH ON INSTALLATION 11,4


11,4
In the case of torch on installation, with slopes lower than 35% (19°), the Tegosolar tile has to be 7,3
handled as follows:
Right side:
" Make 6 holes on Tegosolar in correspondence of the points indicated in Fig. 7 and 8a; should it be
make holes
necessary use the L profile as template / spacer, to be helped.
" Insert the large headed roofing nails, stainless steel AISI 304 high adherence, 20 mm long, by Fig.8A
introducing them from the lower to the upper side of the tile. They'll jut from Tegosolar (Fig. 8b), and
Left side:
shall then be used during the installation as anchorage of the L profiles, using the rounded stop in
insert the 20 mm nails
Fig. 9.

Right side:
insert the 20 mm nails

Fig.8B

11,4cm 11,4cm

11,4cm 11,4cm

8,4cm 7,3cm
Fig.7 Fig.9
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
NAILS INSTALLATION (1) www.tegolacanadese.com 4

Installation starting from the eaves


" Place the 2 S spacers as per Fig. 10A 10B at abt. 96 cm from the line (Fig. 11) , being sure to press the upper part.
" Apply a line of Bitustick along the eave line (Fig. 12).

" Place Tegosolar as per Fig. 9, being sure to place it inside the S spacers.

" Nail Tegosolar with 12 large headed roofing nails, stainless steel AISI 304 high adherence, equidistant at abt. 25 cm as per Fig.

12. Fig.10A Fig.10B


" Repeat the same procedure and place the other Tegosolar right and left 'till the line is completed (Fig. 13).

Waterproofing of the connection


" Take as reference the green lines in Fig. 14 and place the L profiles pre - joined with butyl, as per Fig. 15. Be sure that the butyl BITUSTICK
completely adheres by removing the lower protection and by sealing the connection between the tiles (Fig. 15).
" Fix the L profiles with large headed roofing nails, stainless steel AISI 304 high adherence where the holes are done (Fig. 16).

Fig.11
96 96 96

BITUSTICK

Fig.12

Partially
remove Fig.13
the transparent film

17 mm

Fig.14 Fig.15 Fig.16

Connection
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
NAILS INSTALLATION (2) www.tegolacanadese.com 5

Starting from a roof with bituminous shingles


Stated that, while passing from a part of the slope made with bituminous shingles to a part made with Tegosolar, it's necessary to guarantee the continuous waterproofing of
the roof, it's also necessary to evaluate the minimal overlap of Tegosolar compared to the expected exposure of the shingles. I.e. for Standard or Prestige Elite the minimal
overlap shall be 19,5 cm, while for Prestige Compact it will be 5 cm.

" Once the starting line for Tegosolar is decided, apply a line of Bitustick at 4-5 cm of that line (Fig. 17), unless there are the thermo or self adhesive points making this function
in that position.
" Place the S spacers at 96 cm from the marking (Fig. 17) paying attention to press the upper side, and fix them with large headed roofing nails, stainless steel AISI 304 high

adherence.
" Place Tegosolar as per Fig. 17, paying attention to place it inside the S spacers.

" Apply Tegosolar with 12 large headed roofing nails, stainless steel AISI 304 high adherence, equidistant at abt. 25 cm as stated in Fig. 17.

" Repeat the same procedure for placing the other Tegosolar right and left, 'till the line is done (Fig. 18).

Waterproofing of the connection


" Proceed following instructions at page 4

~ 96 cm ~ 96 cm

BITUSTICK Spacers S Spacers S

Fig.17

Fig.18
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
NAILS INSTALLATION (3) www.tegolacanadese.com 6

Continue installing Tegosolar


" Remove the upper film of the installed tile (Fig. 19-20)
" Place the two S spacers at 96 cm from the right and left corner of Tegosolar (Fig. 19-20). They have to be embedded into the
upper side of the installed tile and nailed in the proper hole.
" Place the new Tegosolar as in the picture, paying attention to let it enter into the spacers that shall also work as locks. The new

Tegosolar will also lay on the L profiles installed before (Fig. 21).
" Apply Tegosolar with 12 large headed roofing nails, stainless steel AISI 304 high adherence, equidistant at abt. 25 cm as stated in

Fig. 21.
" With the same process install Tegosolar right and left 'till the line is done.

Waterproofing of the connection


" Referring to the green line marked in Fig. 22 place the L profiles pre attached with butyl adhesive, as per Fig. 23. Pay attention that

the butyl line, once the lower protection is removed, fully adhere and seals the connection between the tiles placed side by side,
and between the lines (Fig. 23). Fig.19
" Fix them with large headed roofing nails, stainless steel AISI 304 high adherence, in correspondence of the holes (Fig. 24).

Self adhesive area Place the S spacers Remove the film

Fig.20
96 96 96

The following Tegosolar is laid on the L profile pre installed


The following Tegosolar
is fixed into the turn up of the S spacer

Fig.21
Remove partially
the transparent film

17 mm

Fig.22 Fig.23 Fig.24


Repeat it row by row 'till the completion of the installation scheme, paying attention to the lateral profiles described in Nails Installation (4-5)
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
NAILS INSTALLATION (4) www.tegolacanadese.com 7

Lateral left connection with a shingles layer


During the nails installation it is possible to install first Tegosolar and after shingles or vice versa. At the
end the two layers shall be in contact and must be waterproofed and connected with a L profile.

" Install the Tegosolar, following instructions at page 5 and placing the L profile at the right of
connectors, following instructions in fig. 22 23 24 25 in order to obtain what stated in Fig. 26.
" Install the shingles at the left of Tegosolar. The two layers shall be in contact (Fig. 26)

" Place the L profile at the left of connectors, on the shingles (Fig. 26b) Seal
" As per Fig. 27 fix the profiles with 3 large headed roofing nails, stainless steel AISI 304 high adherence,

in correspondence of the holes. Seal eventual discontinuities of the surface.


" Repeat the operation 'till completion of the installing scheme.

Fig.27

Fig.26

180 mm
Remove
partially the
transparent film

Fig.25

26B

Connection
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
NAILS INSTALLATION (5) www.tegolacanadese.com 8

Lateral right connection with a shingle layer


During the nails installation it is possible to install first Tegosolar and after shingles or vice versa.

" In Abb. 28 shingles and Tegosolar have already been applied respecting the marking of
them both and nails position as well.
" In order to be able to proceed with the waterproofing of the connection it's necessary to

apply the L profile by removing the bottom protection. Let completely adhere the butyl
adhesive on the shingles, also compensating eventual relieves that they make (Abb. 29
29b).
" As per Abb. 29 29b fix the profiles with 3 large headed roofing nails, stainless steel AISI 304

high adherence, in correspondence of the holes.


" Repeat the operation 'till completion of the installing scheme.

" For completing the connection install the R profile. This profile, in Abb. 30b, is put into the

upper corner of the L profile, and fixed (Abb. 30).

Abb.28
R PROFILE
dev. 105mm x 1ml
Abb.30 14 10 66
15
Abb.30B

Abb.29 Abb.29B
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
TORCH ON INSTALLATION (1) www.tegolacanadese.com 9

Installation staring from the eaves


" Place the first left Tegosolar close to the marking line (Fig. 31) for the torch on application. Fully lift up the tail of Tegosolar and warm by flame the membrane's bitumen.
Once it's softened re - place Tegosolar and push it in order to help the adhesion.
" Repeat the above for the other Tegosolar at the right 'till completion of the line (Fig. 32).

" Pay attention not to direct the flame towards the upper surface of Tegosolar or towards the connectors.

Waterproofing of the connection


" Remove partially the transparent film of Tegosolar in correspondence of the connection (Fig. 33)

" Remove the protection from the butyl tape of the L profile. Place them paying attention that the holes coincide with the nails arising from Tegosolar (Fig. 33). In this phase

pay attention that the butyl tape fully adhere and seals the connection (Fig. 34).
" Fix the L profiles with the self blocking screws pressing properly (Fig. 35).

Fig.31

Fig.32

Remove partially the transparent film

17 mm

Fig.33 Fig.34 Fig.35


Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
TORCH ON INSTALLATION (2) www.tegolacanadese.com 10

Starting from a roof with shingles


Stated that, while passing from a part of the slope made with bituminous shingles to a part made with Tegosolar, it's necessary to guarantee the continuous waterproofing of the roof, it's
also necessary to evaluate the minimal overlap of Tegosolar compared to the expected exposure of the shingles. I.e. for Standard or Prestige Elite the minimal overlap shall be 19,5 cm,
while for Prestige Compact it will be 5 cm.
" Once the starting line for Tegosolar is defined, apply a line of Bitustick at 4 or 5 cm from this line (Abb. 36), unless there are the thermo or self adhesive points making this function in that

position.
" Place the first left Tegosolar close to the marking line of the row as per Abb. 36 and apply torching it on. Fully lift up the tail of Tegosolar and warm by flame the membrane's bitumen.

Once it's softened re - place Tegosolar and push it in order to help the adhesion.
" Repeat the above for the other Tegosolar at the right 'till completion of the line (Abb. 37).

" Pay attention not to direct the flame towards the upper surface of Tegosolar or towards the connectors

Waterproofing of the connections


" Proceed as stated at page 9

BITUSTICK

Abb.36

Abb.37
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
TORCH ON INSTALLATION (3) www.tegolacanadese.com 11
Continue the installation of Tegosolar
" Remove the upper film of the pre installed tile (Fig. 38 39)
" Place the two S spacers at 96 cm from the left and right corner of Tegosolar (Fig. 38 39). They have to be embedded into the

upper side of the installed tile.


" Place the new Tegosolar as in the picture, paying attention to let it enter into the spacers that shall also work as locks. The new

Tegosolar will also lay on the L profiles installed before (Fig. 40).
" Fully lift up the tail of Tegosolar and warm by flame the membrane's bitumen. Once it's softened re - place Tegosolar and push it in

order to help the adhesion.


" Repeat the above for the other Tegosolar at the right 'till completion of the line.

" Pay attention not to direct the flame towards the upper surface of Tegosolar or towards the connectors

Waterproofing of the connection


" Remove partially the transparent film of Tegosolar, in correspondence of the connection (Fig. 41).

" Remove the protection from the butyl tape of the L profile. Place them paying attention that the holes coincide with the nails
Fig.38
arising from Tegosolar (Fig. 42). In this phase pay attention that the butyl tape fully adhere and seals the connection between
Tegosolar and Tegosolar and between line and line (Fig. 43).
" Fix the L profiles with the self blocking screws pressing properly (Fig. 43).

Self adhesive area Place the S spacers Remove the film

Fig.39
96 96 96

The following Tegosolar is laid on the L profile pre installed


The following Tegosolar
is fixed into the turn up of the S spacer

Fig.40
Remove partially
the transparent film

17 mm

Fig.41 Fig.42 Fig.43


Repeat it row by row 'till the completion of the installation scheme, paying attention to the lateral profiles described in Torch on Installation (4-5)
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
TORCH ON INSTALLATION (4) www.tegolacanadese.com 12

Lateral left connection with a shingles layer


In the torch on installation it's necessary to install Tegosolar first and shingles after. At the end the two
layers shall be in contact and shall be waterproofed and connected with a L profile.
" Place the Tegosolar following instructions at Fig. 41 42 43 44 in order to obtain what stated at Fig.

45.
" The torch on installation of Tegosolar must be done by step because it's necessary to make some

holes into the tile itself, in order to insert then large headed roofing nails, stainless steel AISI 304 high
adherence, for fixing the L profile.
" Place the shingle in connection with the Tegosolar. By means of the L profile locate where to make

the holes (Fig. 45).


" Make the holes and insert large headed roofing nails, stainless steel AISI 304 high adherence 20 mm

long from the back of the tile. Place again the shingle and torch it on (NB. Do not direct the flame
towards Tegosolar).
" Proceed as above for the following shingles (Fig. 46)

" Once the shingles installation is done remove the bottom protection of the L profiles and apply

them. The nails should enter into their holes, and the butyl must adhere both on the shingle and on
Tegosolar in order to waterproof the connection (Fig. 47).
Fig.46
" Seal eventual discontinuities on the surface (Fig. 47).

" Repeat the operation 'till completion of the installing scheme.

Fig.45

Seal

Fig.44 Fig.47
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
TORCH ON INSTALLATION (5) www.tegolacanadese.com 13

Lateral right connection with a shingles layer


In the torch on installation for the right connection it's possible to install Tegosolar first and
shingles after, or vice versa.

" In Fig. 48 the shingle and the Tegosolar layers are already installed respecting the marking
and the installation procedures of both products.
" In order to proceed with the waterproofing of the connection it's necessary to apply a L

profile by removing the protection. The nails should enter into their holes, and the butyl must
adhere both on the shingle and on Tegosolar in order to waterproof the connection (Fig. 49
49b).
" Repeat the operation 'till completion of the installing scheme.

" For completing the connection install the R profile. This profile, in Fig. 50b, is put into the

upper corner of the L profile, and fixed (Fig. 50).

Fig.48

PROFILO R
sv. 105mm x 1ml
Fig.50
14 10 66
15
Fig.50B

Fig.49
Fig.49B
Date 11-04-08 INSTALLATION INSTRUCTIONS D.R.S.2022 Rev.1
INSTALLATION OF THE CAP www.tegolacanadese.com 14

Execute the connections between the tiles according to the electrical


project (the Italian law requires a certification on the wiring that can be
issued by a specialized electrician only).
As protection of the cables and connectors apply the cap as per Fig. 51,
and fix it in its holes with the proper screws (Fig. 52).

Fig.51

Fig.52