DAILYREPORTFROM SITE

S.No:38

1.

Date 15.02.2013

Site: M/s Baldev alloys pvt. LTD.


Vwta020,VWHA052,053,054

Details of
communications
received on (E-mail,
Fax, Courier, Post, by
hand etc.,)

Nil.

2.

Details of communications sent to HO


on

Daily report.

3.

Details of consignments / materials


received from HO / others

Nil.

4.

Details of payments received from HO /


others

Nil.

5.

Attendance with details


:

MR.M.E.MANIKANDAN(2141)

5.1

Staff (VEESONS)

Mr. DINESH KUMAR.S (1832)

5.2

6.

Contract Workers (Contractor wise)

Important brief feedback about Fabrication


/ Erection / Commissioning (delay with
reference to schedule, major problems
etc.,)

Utkal Engineers:
Boiler: Supervisor:01 IB
05; Riger-02;grinder-0 Helper-06(Total=17)

1.contractor man power shortage

2. Radiography film required from con


3.customer side insert plates

7.

Materials, documents, payments urgently


required from HO with details

1. Utkal engg Contractor payment.

8.

Any urgent / important site complaints

UTKAL Engineering Should be


increasing his manpower.

Site status:

VWTA020 BOILER:
Work started time: 08-00AM work end time: 8-00PM
1) Feed water discharge header to WHRB I, II, III eco inlet
piping HP welding work U/P.
2) Feed water discharge header to WHRB I, II, III eco inlet
piping erection work U/P.
3) PA Branch Damper attending platform erection work
Completed.
4) Dea. To Feed Pump Suction Piping support work U/P.

ESP;
1) Rain roof Beam erection work U/P.

Prepared by (Name):

M.E.MANIKANDAN

Checked & Approved by (Name) :

M.E.MANIKANDAN

Signature:

Signature:

Staff No : 2141

Staff No. :2141