Sei sulla pagina 1di 2

COTIZACION #88 - 002

COTIZACION DE AGREGADOS PROMANORT EIRL - 2015


RUC : 20540040525
CONTACTO: Claro- 948240891 / Rpm: #995151266 / WILMER POZO PRETELL
CANT.
194.15
42.78
8.15
755.30
546.01

DESCRIPCION
Hormign
Piedra Base 6"
Piedra Base 3"
Gravilla 1/2''
Arena Gruesa
SUB - TOTAL
IGV 18%
TOTAL DE LA COTIZACION (S/.)

UND
M3
M3
M3
M3
M3

P. UNIT.
71.00
78.50
78.50
87.50
83.00

P.TOTAL
13,784.65
3,358.23
639.78
66,088.75
45,318.83
129,190.24
23,254.24
152,444.48

*TENGO EN STOCK ESE MATERIAL NO HAY PROBLEMA POR ABASTECIMIENTO, PARA ENTREGA ADJUNTAR
CONTRATO Y CALENDARIO DE ENTREGA DE MATERIALES, COSTOS SON PUESTOS EN OBRA. (SALPO)

ATTE:

WILMER ARTURO POZO PRETELL


Gerente General

COTIZACION #88 - 002

COTIZACION DE AGREGADOS PROMANORT EIRL - 2015


RUC : 20540040525
CONTACTO: Claro- 948240891 / Rpm: #995151266 / WILMER POZO PRETELL
CANT.
194.15
42.78
8.15
755.30
546.01

DESCRIPCION
Hormign
Piedra Base 6"
Piedra Base 3"
Gravilla 1/2''
Arena Gruesa
TOTAL DE LA COTIZACION (S/.)

UND
M3
M3
M3
M3
M3

P. UNIT. (SIN IGV)


71.00
78.50
78.50
87.50
83.00

SUB TOTAL
13784.65
3358.23
639.78
66088.75
45318.83
129,190.24

***COTIZACION DE PRECIOS SIN IGV**

*TENGO EN STOCK ESE MATERIAL NO HAY PROBLEMA POR ABASTECIMIENTO, PARA ENTREGA ADJUNTAR
CONTRATO Y CALENDARIO DE ENTREGA DE MATERIALES, COSTOS SON PUESTOS EN OBRA. (SALPO)

ATTE:

WILMER ARTURO POZO PRETELL


Gerente General

Potrebbero piacerti anche