Date :
05 Dec 12
Rev. :
RFA Type :
MS
Submitted by :
Construction
MEP
QA/QC
Engineering
Note: The above mentioned Method Statement was amended taking into consideration your comments from the previous
submission and is resubmitted for you review and approval. Your prompt approval of the same will be greatly appreciated
Signed :
Signed :
Date :
Engineers Assistant
Name :
Signed :
Date :
Approval Status :
A
Approved, no exception taken. No re-submittal required. Proceed with manufacture, fabrication and/or construction.
Approved with Comment, incorporate comments, resubmit within 7 days. Proceed with manufacture, fabrication
and/or construction.
Rejected. Incorporate comments and re-submit. Do not proceed with manufacture, fabrication and/or construction.
ITEM
COMMENTS
STATUS
1
2
3
4
5
We enclose 1 set ELC. DWG. to TVJV CC:NAC 1 copy, PMUT2 1copy
Page 1 of 2
6
7
8
Page 2 of 2