Sei sulla pagina 1di 2

Capacity Management

using existing resource

Cell Peak Util. > 80 %

No
Yes

Inform to
PM for
additional
TRX

Cell Config.
No

Get from low


peak util. cells
and add TRX

If cell having already 4 TRXs


and peak util. > 80 then plan
new Capacity site.

Keep as
it is.

Yes

As per Sept04 ?

Yes

Note:

No

Peak Util. < 30 %

Remove one TRX and


calculate Peak Utilization
again base on new offered
Erl.

Yes

Peak Util. > 60 %

Keep as it
is. Dont
Remove
TRX

No

Check any other cells having Peak


Util > 90 % and its TRX config is
as per Sept04.
Yes
Remove TRX &
Send to those cell
( exceeding sept04
config.)

No

Better to lock
it till actually
require. It
will reduce
network
interference

Potrebbero piacerti anche